WorldWideScience

Sample records for research project team

  1. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  2. Team Research at the Biology-Mathematics Interface: Project Management Perspectives

    Science.gov (United States)

    Milton, John G.; Radunskaya, Ami E.; Lee, Arthur H.; de Pillis, Lisette G.; Bartlett, Diana F.

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics…

  3. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  4. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  5. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  6. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  7. Team effectiveness in Non-Governmental Organizations (NGOs) projects.

    Science.gov (United States)

    Latif, Khawaja Fawad; Williams, Nigel

    2017-10-01

    The incorporation of team context into research and practice regarding team effectiveness in NGOs projects is a constant challenge. The research seeks to address the gap and identify the critical determinants of team effectiveness in projects undertaken by non-governmental organizations. Using a systematic process, the study involved both literature and focus group discussions to generate the required items. A total of 157 respondents (Team Members and Team Leaders) were part of the study that filled the questionnaires. Using exploratory factor analysis followed by confirmatory factor analysis, both convergent and discriminant validity was established. The present study found that team effectiveness in NGO social projects has a total of seven dimensions namely: Inter team coordination, community social linkage, team performance, knowledge, skills, and attitudes, leadership communication and engagement, decision making and information sharing, and team formation. There is a significant lack of research on team effectiveness in NGO projects. Where considerably large proportion of research on team effectiveness has focused on the corporate sector, the non-governmental teams have been neglected. This study clearly highlights the determinants that make up team effectiveness in NGOs. The determinants identified will help to specifically look at the effectiveness of teams in NGO projects. The study would help NGOs identify the dimensions in which they may be performing in a weaker manner and direct their energies in improving the factors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  9. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  10. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  11. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  12. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    Science.gov (United States)

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  13. Improving Scientific Research Methodology in Undergraduate Medical Students: a case of team based training blended in a research project

    Institute of Scientific and Technical Information of China (English)

    W.Zhang; C.Cambier; Y.Zhang; J.M.Vandeweerd; P.Gustin

    2014-01-01

    An educational intervention targeting medical students and aiming to develop skills useful to the writing of a health science research protocol over a short period of time has been developed in the Shanghai Jiao Tong University School of Medicine. The methodology blending the principles of PBL and TBL is detailed and key issues of this implementation are discussed. Twenty-one students were enrolled in a research master degree and participated to three mandatory 180-minutes sessions. Beyond classical skills useful to solve a problem, this new intervention focused on the transformation of knowledge to create an authentic content, which is a feature of the project-based learning(PBL). The training process was designed according to team-based learning(TBL) procedure except that work sharing between groups and pooling resources and outcomes of each group allowed the construction of one final class original research project in the field of respiratory pharmacology. The combination of both learning methods allowed promoting individual and group accountability necessary to improve self-learning and the quality of the final joint project. The peer reviewing was an essential factor in creating the students’ motivation and improving of team discussion. The grades individually assigned for skills and quality of the project by an external teacher suggested that key objectives of the intervention were reached. In conclusion, the educational intervention described in this paper appears as an appropriate method to develop specific skills necessary to write and discuss a research project within a research team.Further works are necessary to measure the degree of satisfaction of students and improvement of performance.

  14. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    Directory of Open Access Journals (Sweden)

    Aleksandra Rudawska

    2017-03-01

    Full Text Available Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires. The measures used for the study were developed specifcally for the study referring to the previous research in the feld. Findings: Results indicate that leaders in team projects and conditions supporting teamwork are connected with the students’ perception of teamwork effectiveness, while the fairness in team projects is connected with students’ preference of working collectively. Research implications: We conclude that in order to develop a positive attitude towards teamwork, the teamwork projects should be better supported by the instructors (especially supporting the emergence of leader(s and minimising the problem of free riders and the university should create a climate that facilitates teamworking, otherwise team projects might negatively influence students’ attitude towards collective work. Value: On the labour market the teamwork skills are one of the most important skills of employees, as the team-based organizational designs are becoming the norm in work organization. The study is contributing to the understanding of the relations between student experiences and their attitudes as well as the role played by high education in the development of these attitudes. Some previous research in Anglo-Saxon culture countries indicate that team project assignments realised by students during studies might even hinder their attitudes to teamwork and their willingness to work in teams in the future.

  15. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  16. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  17. Intercultural team maturity model: Unity, diversity, capability. Achieving optimal performance when leading \\ud a multicultural project team

    OpenAIRE

    Prabhakar, G. P.; Walker, S.

    2005-01-01

    Our research helps to judge ‘maturity’ as an asset to projects and heightens awareness of situational leadership, using intercultural team maturity levels as a tool for optimal project leadership success.\\ud \\ud This study focuses on exactly how to analyse the team members’ ability to adapt to complex intercultural project environments, using an intercultural team maturity model.

  18. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  19. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  20. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  1. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  2. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  3. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  4. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    OpenAIRE

    Aleksandra Rudawska

    2017-01-01

    Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university) on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires). The measures used f...

  5. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  6. Student-Led Project Teams: Significance of Regulation Strategies in High- and Low-Performing Teams

    Science.gov (United States)

    Ainsworth, Judith

    2016-01-01

    We studied group and individual co-regulatory and self-regulatory strategies of self-managed student project teams using data from intragroup peer evaluations and a postproject survey. We found that high team performers shared their research and knowledge with others, collaborated to advise and give constructive criticism, and demonstrated moral…

  7. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  8. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  9. Factors Contributing to Research Team Effectiveness: Testing a Model of Team Effectiveness in an Academic Setting

    Science.gov (United States)

    Omar, Zoharah; Ahmad, Aminah

    2014-01-01

    Following the classic systems model of inputs, processes, and outputs, this study examined the influence of three input factors, team climate, work overload, and team leadership, on research project team effectiveness as measured by publication productivity, team member satisfaction, and job frustration. This study also examined the mediating…

  10. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  11. 33 CFR 385.17 - Project Delivery Team.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  12. Can teams benefit from using a mindful infrastructure when defensive behaviour threatens complex innovation projects?

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vroome, E.M.M. de

    2016-01-01

    Projects are often doomed to fail. An explorative case study which carried out team-based complex innovation projects in a research and technology organisation suggests three main results. 1] Project team leaders experienced that the complexity involved in the various aspects of team functioning,

  13. Defensive behaviours in innovation teams: how project teams discuss defensiveness and its relationship with innovation resilience behaviour and project success

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vuuren, T. van

    2016-01-01

    Project team members and project leaders of innovation projects were interviewed about the possible presence of defensive behaviours within the team. While investigating defensive behaviour can be done validly by observation techniques, to talk about defensiveness within a team often leads to

  14. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  15. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  16. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  17. Research team training: moving beyond job descriptions.

    Science.gov (United States)

    Nelson, LaRon E; Morrison-Beedy, Dianne

    2008-08-01

    Providing appropriate training to research team members is essential to the effective implementation and overall operation of a research project. It is important to identify job requirements beyond those listed in the job description in order to fully assess basic and supplementary training needs. Training needs should be identified prior to and during the conduct of the study. Methods for delivering the training must also be identified. This article describes the identification of training needs and methods in the design of a research team training program using examples from an HIV prevention intervention trial with adolescent girls.

  18. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  19. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  20. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  1. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  2. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  3. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  4. Team-Based Multidisciplinary Research Scholarship in the Geosciences

    Science.gov (United States)

    Wernette, P. A.; Houser, C.; Quick, C.

    2016-12-01

    The traditional approach to undergraduate research can be time-intensive for both the mentee and mentor, and can deter potential undergraduates and faculty from participating in research. The Aggie Research Leadership (ARL) and Aggie Research Scholars (ARS) programs represent a team-based, vertically-tiered, and multidisciplinary approach to research that can successfully address complex and relevant research questions. The program is structured such that faculty mentor one or more graduate students or postdocs, who, in turn, mentor teams of 2 to 8 undergraduate students. While it is the responsibility of the graduate student or postdoc to put together a team that works for their research question, undergraduate teams are encouraged to be multidisciplinary in order to leverage the experience and perspective that comes from students in different areas of study. Team leaders are encouraged to discuss their research teams with the faculty mentor regularly to address any potential issues that they might be having, but team leaders are required to meet regularly with other team leaders to discuss any issues that they might be having. Meeting with new and experienced team leaders is a valuable approach to a graduate student or postdoc developing their own set of best practices for mentoring. This experience is invaluable in their future careers, regardless of the field of study. By collaborating with students from other fields of study, no one student is required to become an expert in all topics relating to the research. Another significant advantage of the ARL/ARS programs is that complex research questions are able to be examined because teams typically continue longer than a single semester or academic year. Research teams are vertically-tiered and typically include freshman through seniors. In this way, younger students on the projects are mentored by senior students when they first arrive. Eventually, the younger students will advance through to senior students and

  5. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  6. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  7. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  8. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  9. Progress report on recommendations of the Flaring Project Team

    International Nuclear Information System (INIS)

    Macken, C.

    1999-01-01

    Part of the mandate of the Clean Air Strategic Alliance (CASA) is to share decision-making responsibility for air quality management with the government of Alberta, through the ministries of Environmental Protection, Energy, and Health, and the Alberta Energy and Utilities Board (EUB). CASA's vision for air quality in Alberta is that 'the air will be odourless, tasteless, look clear, and have no measurable short- or long-term adverse effects on people, animals, or the environment'. In 1997, CASA approved the establishment of the Flaring Project Team in response to public concern about potential and observed impacts associated with flaring of solution gas. Members of that team established a framework for the management of solution gas flaring. Their long-term goal is to eliminate routine flaring of solution gas. The Project Team assessed existing information on solution gas flaring, including technologies, efficiencies, emissions and impacts. Alternative technologies were also reviewed along with biological and health effects of solution gas flaring. A list of data gaps and research needs was compiled in order to help with the development of the Team's recommendations. The Team's final report was delivered in June 1998. It was recommended that the following policy objective hierarchy be used to guide decisions related to routine solution gas flaring: (1) eliminate routine solution gas flaring, (2) reduce volumes of gas flared, and (3) improve the efficiency of flares. By way of progress the Project Team was able to report that in March, 1999, the EUB issued a draft interim directive to address upstream petroleum industry flaring. The draft Directive incorporates the recommendations from the CASA Flaring Project Team with respect to management of solution gas flaring. In December 1998, changes to the royalty structure to encourage the productive use of flare gas have been announced by the Alberta Department of Energy and Alberta Environmental protection, thus

  10. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  11. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  12. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  13. Ties That Bind International Research Teams: A Network Multilevel Model of Interdisciplinary Collaboration

    Science.gov (United States)

    Kollasch, Aurelia Wiktoria

    2012-01-01

    Today large research projects require substantial involvement of researchers from different organizations, disciplines, or cultures working in groups or teams to accomplish a common goal of producing, sharing, and disseminating scientific knowledge. This study focuses on the international research team that was launched in response to pressing…

  14. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  15. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  16. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  17. Reflections on shifts in the work identity of research team members

    Directory of Open Access Journals (Sweden)

    Rina A. Smith

    2015-06-01

    Full Text Available Orientation: This study explores shifts in the work identity of individual members of a research team. Research purpose: The aim of the study is to explore shifts in work identity experienced by individual research team members during a project wherein they were studying work identity themselves. Motivation for the study: This study seized the opportunity to do research on the shifts in work identify experienced by researchers whilst they were studying work identify as part of the South African–Netherlands Project for Alternatives in Development. This allowed the researcher the rather novel opportunity of conducting research on researchers and resulted in the project as a whole occurring at a dual level of analysis. Research approach, design and method: Using thematic analysis methodology in the context of qualitative field research, 10 semi-structured interviews were conducted with five participants, all of them part of the research team who were themselves involved in conducting research on work identity. The sixth member of the research team, who is also one of the authors of this article, presented data related to shifts in her own work identity in her dissertation as an autoethnographic account. For purposes of this article, she is referred to as Participant 6. Given the multiple research team members, each one of whom constituted an individual case, the researcher made use of a multiple case study approach whilst focusing on the intrinsic case. The holistic nature of description found in the case study involved every aspect of the lives of the research team members. Analysis was done by means of content analysis. Main findings: In exploring the shifts in work identity experienced by individual research team members, it was discovered that finding meaning and purpose in the professional activities participants engaged in was of critical importance. Contextual realities and the way in which individuals approached the possibility of shifts

  18. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    Science.gov (United States)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a

  19. Exploring leadership in self-managed project teams in Malaysia

    Directory of Open Access Journals (Sweden)

    Zaleha Yazid

    2015-01-01

    Full Text Available This paper focuses on a longitudinal approach in exploring leadership in Self-Managed Project Teams (SMPT. SMPT has been known to contribute to organizations by improving productivity and increasing organizational performance. Therefore, understanding the dynamics of leadership in this type of team can be seen as one of the important factors to ensure the success of organizations. Leading a team which manages itself is a challenge as increased autonomy and control is given to the team which eliminates the existence of a leader. It is important to understand the extent of how the external leader is involved within SMPT and whether the external leader approaches highlighted in the literature are applicable in such a situation and how these approaches change during work processes. This study comprises of evidence collected through semi-structured interviews in two small and medium sized organizations in Malaysia. Weekly telephone interviews as well as face-to-face interviews were conducted which provides contextual data for the research. In this research, the evidence suggested that SMPT transform from self-managed toward leader-managed resulting from several factors, such as conflict handling strategies. Specifically, it was found that avoiding conflicts, rather than confronting, transform the team into being leader dependent.

  20. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  1. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  2. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  3. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  4. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  5. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  6. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  7. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  8. The Research of Self-Management Team and Superior-Direction Team in Team Learning Influential Factors

    OpenAIRE

    Zhang Wei

    2013-01-01

    Team learning is a cure for bureaucracy; it facilitates team innovation and team performance. But team learning occurs only when necessary conditions were met. This research focused on differences of team learning influential factors between self-management team and superior-direction team. Four variables were chosen as predictors of team learning though literature review and pilot interview. The 4 variables are team motivation, team trust, team conflict and team leadership. Selected 54 self ...

  9. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  10. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  11. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  12. Using Action Research to Teach Students to Manage Team Learning and Improve Teamwork Satisfaction

    Science.gov (United States)

    Scott-Ladd, Brenda; Chan, Christopher C. A.

    2008-01-01

    This article reports on a study investigating strategies that students can use to develop skills in managing team learning. Two groups of second-year management students participated in a semester-long action research project over two semesters. The students were educated on team development, team processes and conflict management and how to…

  13. Scientific retreats with 'speed dating': networking to stimulate new interdisciplinary translational research collaborations and team science.

    Science.gov (United States)

    Ranwala, Damayanthi; Alberg, Anthony J; Brady, Kathleen T; Obeid, Jihad S; Davis, Randal; Halushka, Perry V

    2017-02-01

    To stimulate the formation of new interdisciplinary translational research teams and innovative pilot projects, the South Carolina Clinical and Translational Research (SCTR) Institute (South Carolina Clinical and Translational Science Award, CTSA) initiated biannual scientific retreats with 'speed dating' networking sessions. Retreat themes were prioritized based on the following criteria; cross-cutting topic, unmet medical need, generation of novel technologies and methodologies. Each retreat begins with an external keynote speaker followed by a series of brief research presentations by local researchers focused on the retreat theme, articulating potential areas for new collaborations. After each session of presentations, there is a 30 min scientific 'speed dating' period during which the presenters meet with interested attendees to exchange ideas and discuss collaborations. Retreat attendees are eligible to compete for pilot project funds on the topic of the retreat theme. The 10 retreats held have had a total of 1004 participants, resulted in 61 pilot projects with new interdisciplinary teams, and 14 funded projects. The retreat format has been a successful mechanism to stimulate novel interdisciplinary research teams and innovative translational research projects. Future retreats will continue to target topics of cross-cutting importance to biomedical and public health research. Copyright © 2016 American Federation for Medical Research.

  14. Leadership and organizational tenure diversity as determinants of project team effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  15. Leadership and Organizational Tenure Diversity as Determinants of Project Team Effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  16. Problem-Based Service Learning: The Evolution of a Team Project

    Science.gov (United States)

    Connor-Greene, Patricia A.

    2002-01-01

    In this article, I describe the evolution of a problem-based service learning project in an undergraduate Abnormal Psychology course. Students worked in teams on a semester-long project to locate and evaluate information and treatment for specific psychiatric disorders. As part of the project, each team selected relevant bibliographic materials,…

  17. Team Science Approach to Developing Consensus on Research Good Practices for Practice-Based Research Networks: A Case Study.

    Science.gov (United States)

    Campbell-Voytal, Kimberly; Daly, Jeanette M; Nagykaldi, Zsolt J; Aspy, Cheryl B; Dolor, Rowena J; Fagnan, Lyle J; Levy, Barcey T; Palac, Hannah L; Michaels, LeAnn; Patterson, V Beth; Kano, Miria; Smith, Paul D; Sussman, Andrew L; Williams, Robert; Sterling, Pamela; O'Beirne, Maeve; Neale, Anne Victoria

    2015-12-01

    Using peer learning strategies, seven experienced PBRNs working in collaborative teams articulated procedures for PBRN Research Good Practices (PRGPs). The PRGPs is a PBRN-specific resource to facilitate PBRN management and staff training, to promote adherence to study protocols, and to increase validity and generalizability of study findings. This paper describes the team science processes which culminated in the PRGPs. Skilled facilitators used team science strategies and methods from the Technology of Participation (ToP®), and the Consensus Workshop Method to support teams to codify diverse research expertise in practice-based research. The participatory nature of "sense-making" moved through identifiable stages. Lessons learned include (1) team input into the scope of the final outcome proved vital to project relevance; (2) PBRNs with diverse domains of research expertise contributed broad knowledge on each topic; and (3) ToP® structured facilitation techniques were critical for establishing trust and clarifying the "sense-making" process. © 2015 Wiley Periodicals, Inc.

  18. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  19. Librarians as Part of Cross-Disciplinary, Multi-Institutional Team Projects: Experiences from the VIVO Collaboration

    Science.gov (United States)

    Garcia-Milian, Rolando; Norton, Hannah F.; Auten, Beth; Davis, Valrie I.; Holmes, Kristi L.; Johnson, Margeaux; Tennant, Michele R.

    2013-01-01

    Cross-disciplinary, team-based collaboration is essential for addressing today’s complex research questions, and librarians are increasingly entering into such collaborations. This study identifies skills needed as librarians integrate into cross-disciplinary teams, based on the experiences of librarians involved in the development and implementation of VIVO, a research discovery and collaboration platform. Participants discussed the challenges, skills gained, and lessons learned throughout the project. Their responses were analyzed in the light of the science of team science literature, and factors affecting collaboration on the VIVO team were identified. Skills in inclusive thinking, communication, perseverance, adaptability, and leadership were found to be essential. PMID:23833333

  20. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  1. Scientific Retreats with ‘Speed Dating’: Networking to Stimulate New Interdisciplinary Translational Research Collaborations and Team Science

    Science.gov (United States)

    Alberg, Anthony J.; Brady, Kathleen T.; Obeid, Jihad S.; Davis, Randal; Halushka, Perry V.

    2016-01-01

    To stimulate the formation of new interdisciplinary translational research teams and innovative pilot projects, the South Carolina Clinical & Translational Research (SCTR) Institute (South Carolina Clinical and Translational Science Award, CTSA) initiated biannual scientific retreats with “speed dating” networking sessions. Retreat themes were prioritized based on the following criteria; cross-cutting topic, unmet medical need, generation of novel technologies and methodologies. Each retreat commences with an external keynote speaker followed by a series of brief research presentations by local researchers focused on the retreat theme, articulating potential areas for new collaborations. After each session of presentations, there is a 30 minute scientific “speed dating” period during which the presenters meet with interested attendees to exchange ideas and discuss collaborations. Retreat attendees are eligible to compete for pilot project funds on the topic of the retreat theme. The 10 retreats held have had a total of 1004 participants, resulted in 61 pilot projects with new interdisciplinary teams, and 14 funded projects. The retreat format has been a successful mechanism to stimulate novel interdisciplinary research teams and innovative translational research projects. Future retreats will continue to target topics of cross-cutting importance to biomedical and public health research. PMID:27807146

  2. Team collaborative innovation management based on primary pipes automatic welding project

    International Nuclear Information System (INIS)

    Li Jing; Wang Dong; Zhang Ke

    2012-01-01

    The welding quality of primary pipe directly affects the safe operation of nuclear power plants. Primary pipe automatic welding, first of its kind in China, is a complex systematic project involving many facets, such as design, manufacturing, material, and on-site construction. A R and D team was formed by China Guangdong Nuclear Power Engineering Co., Ltd. (CNPEC) together with other domestic nuclear power design institutes, and manufacturing and construction enterprises. According to the characteristics of nuclear power plant construction, and adopting team collaborative innovation management mode, through project co-ordination, resources allocation and building production, education and research collaborative innovation platform, CNPEC successfully developed the primary pipe automatic welding technique which has been widely applied to the construction of nuclear power plant, creating considerable economic benefits. (authors)

  3. Project work on wellbeing in multidisciplinary student teams : A triple testimonial on eps at artesis

    NARCIS (Netherlands)

    Rohaert, S.; Baelus, C.; Lacko, D.

    2012-01-01

    The European Project Semester (EPS) programme offers an educational framework to support students to practice problem-and project-based cross-disciplinary product innovation and research, in small multidisciplinary and international teams. To explore the potential and the restrictions of this

  4. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  5. Reflexive journaling on emotional research topics: ethical issues for team researchers.

    Science.gov (United States)

    Malacrida, Claudia

    2007-12-01

    Traditional epistemological concerns in qualitative research focus on the effects of researchers' values and emotions on choices of research topics, power relations with research participants, and the influence of researcher standpoints on data collection and analysis. However, the research process also affects the researchers' values, emotions, and standpoints. Drawing on reflexive journal entries of assistant researchers involved in emotionally demanding team research, this article explores issues of emotional fallout for research team members, the implications of hierarchical power imbalances on research teams, and the importance of providing ethical opportunities for reflexive writing about the challenges of doing emotional research. Such reflexive approaches ensure the emotional safety of research team members and foster opportunities for emancipatory consciousness among research team members.

  6. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  7. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    Science.gov (United States)

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  8. A cross sectional observational study of research activity of allied health teams: is there a link with self-reported success, motivators and barriers to undertaking research?

    Science.gov (United States)

    Wenke, Rachel J; Mickan, Sharon; Bisset, Leanne

    2017-02-06

    Team-based approaches to research capacity building (RCB) may be an efficient means to promote allied health research participation and activity. In order to tailor such interventions, a clearer understanding of current patterns of research participation within allied health teams is needed. Different self-report measures exist which evaluate a team's research capacity and participation, as well as associated barriers and motivators. However, it remains unclear how such measures are associated with a team's actual research activity (e.g., journal publications, funding received). In response, this observational study aimed to identify the research activity, self-reported success, and motivations and barriers to undertaking research of eight allied health professional (AHP) teams and to explore whether any relationships exist between the self-reported measures and actual research activity within each team. A total of 95 AHPs from eight teams completed the research capacity and culture survey to evaluate team success, barriers and motivators to undertaking research, and an audit of research activity from January 2013 to August 2014 was undertaken within each team. Kendell's correlation coefficients were used to determine the association between research activity (i.e., number of journal publications, ethically approved projects and funding received) and the self-reported measures. Seven out of eight teams rated their teams as having average success in research and demonstrated some form of research activity including at least two ethically approved projects. Research activity varied between teams, with funding received ranging from $0 to over $100,000, and half the teams not producing any journal publications. Team motivators demonstrated a stronger association with research activity compared to barriers, with the motivator "enhancing team credibility" being significantly associated with funding received. No significant association between self-reported research

  9. Team knowledge research: emerging trends and critical needs.

    Science.gov (United States)

    Wildman, Jessica L; Thayer, Amanda L; Pavlas, Davin; Salas, Eduardo; Stewart, John E; Howse, William R

    2012-02-01

    This article provides a systematic review of the team knowledge literature and guidance for further research. Recent research has called attention to the need for the improved study and understanding of team knowledge. Team knowledge refers to the higher level knowledge structures that emerge from the interactions of individual team members. We conducted a systematic review of the team knowledge literature, focusing on empirical work that involves the measurement of team knowledge constructs. For each study, we extracted author degree area, study design type, study setting, participant type, task type, construct type, elicitation method, aggregation method, measurement timeline, and criterion domain. Our analyses demonstrate that many of the methodological characteristics of team knowledge research can be linked back to the academic training of the primary author and that there are considerable gaps in our knowledge with regard to the relationships between team knowledge constructs, the mediating mechanisms between team knowledge and performance, and relationships with criteria outside of team performance, among others. We also identify categories of team knowledge not yet examined based on an organizing framework derived from a synthesis of the literature. There are clear opportunities for expansion in the study of team knowledge; the science of team knowledge would benefit from a more holistic theoretical approach. Human factors researchers are increasingly involved in the study of teams. This review and the resulting organizing framework provide researchers with a summary of team knowledge research over the past 10 years and directions for improving further research.

  10. Helping fluid teams work: A research agenda for effective team adaptation in healthcare.

    Science.gov (United States)

    Bedwell, Wendy L; Ramsay, P Scott; Salas, Eduardo

    2012-12-01

    Although membership changes within teams are a common practice, research into this phenomenon is relatively nascent (Summers et al.; Acad Manag J 55:314-338, 2012). The small literature base, however, does provide insight into skills required for effective adaptation. The purpose of this effort is to provide a brief research synopsis, leading to research hypotheses about medical team training. By generalizing previous scientific findings regarding skills required for effective membership adaptation in different kinds of teams, we posit mechanisms whereby teamwork training might also support adaptation among medical teams (Burke et al.; Qual & Saf Health Care 13:i96-i104, 2004 and Salas et al.; Theor Issues Ergon Sci 8:381-394, 2007). We provide an overview of the membership change literature. Drawing upon literature from both within and outside of the medical domain, we suggest a framework and research propositions to aid in research efforts designed to determine the best content for helping to create adaptable medical teams through team training efforts. For effective adaptation, we suggest ad hoc teams should be trained on generalizable teamwork skills, to share just "enough" and the "right" information, to engage in shared leadership, and to shift from explicit to implicit coordination. Our overarching goal was to present what is known from the general research literature on successful team adaptation to membership changes, and to propose a research agenda to evaluate whether findings generalize to member changes in medical teams.

  11. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  12. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  13. Broadening participation in Research Experiences for Undergraduates (REU) programs: an evaluation of the team research model for undergraduate research experiences

    Science.gov (United States)

    Berthelote, A. R.; Geraghty Ward, E. M.; Dalbotten, D. M.

    2014-12-01

    The REU site on sustainable land and water resources has a goal of broadening participation in the geosciences by underrepresented groups and particularly Native American students. We are evaluating modifications to the traditional REU model in order to better support these students. First, we review a team research model for REU students, where students are placed on teams and work together in peer groups supported by a team of mentors. Second, the REU takes place in locations that have high populations of Native American students to remove barriers to participation for non-traditional students. Finally, the teams do research on issues related to local concerns with cultural focus. Traditional REU models (1 faculty to 1 student/on campus) have been shown to be effective in supporting student movement into graduate programs but often fail to attract a diverse group of candidates. In addition, they rely for success on the relationship between faculty and student, which can often be undermined by unrealistic expectations on the part of the student about the mentor relationship, and can be exacerbated by cultural misunderstanding, conflicting discourse, or students' personal or family issues. At this REU site, peer mentorship and support plays a large role. Students work together to select their research question, follow the project to completion and present the results. Students from both native and non-native backgrounds learn about the culture of the partner reservations and work on a project that is of immediate local concern. The REU also teaches students protocols for working on Native American lands that support good relations between reservation and University. Analysis of participant data gathered from surveys and interview over the course of our 3-year program indicates that the team approach is successful. Students noted that collaborating with other teams was rewarding and mentors reported positively about their roles in providing guidance for the student

  14. Analysis of Return on Investment in Different Types of Agile Software Development Project Teams

    Directory of Open Access Journals (Sweden)

    Goran MILANOV

    2012-01-01

    Full Text Available This exploratory study of IT project teams in Serbia investigates how the choice of agile methods in different development project teams affects the return-on-investment (ROI. In this paper different types of software project teams are analyzed in order to examine and identify the business-value of using agile methods. In various software development project teams, the ROI of agile methods is yet to be fully explored, while the ROI of traditional methods is well-understood. Since ROI is important indicator of the projects success, in this paper we examine the factors that influence the ROI both from software solution customer point of view, and different agile project teams.

  15. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  16. What constitutes meaningful engagement for patients and families as partners on research teams?

    Science.gov (United States)

    Black, Agnes; Strain, Kimberly; Wallsworth, Christine; Charlton, Sara-Grey; Chang, Wilma; McNamee, Kate; Hamilton, Clayon

    2018-01-01

    Objective There is growing emphasis on health care organizations to ensure that lay people are meaningfully engaged as partners on research teams. Our aim was to explore the perspectives of patients, family members and informal caregivers who have been involved on health care research teams in Canada and elicit their recommendations for meaningful engagement. Methods We conducted a qualitative study guided by thematic analysis of transcripts of focus groups and interviews of 19 experienced patient research partners in Canada. Results We identified four main themes: research environment, expectations, support and value, which highlight participants' combined perspectives on important factors to ensure their engagement in research is meaningful. Conclusions Our findings add to the evolving evidence base on the perspectives of lay people involved in health care research and their recommendations for research leaders on meaningful engagement. Our study suggests that research leaders should provide a welcoming research environment, outline appropriate expectations for patient research partners on research teams, support patient research partners' engagement in projects and recognize the value patient research partners bring to health research.

  17. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  18. The Workings of a Multicultural Research Team

    Science.gov (United States)

    Friedemann, Marie-Luise; Pagan-Coss, Harald; Mayorga, Carlos

    2013-01-01

    Purpose Transcultural nurse researchers are exposed to the challenges of developing and maintaining a multiethnic team. With the example of a multicultural research study of family caregivers conducted in the Miami-Dade area, the authors guide the readers through steps of developing a culturally competent and effective team. Design Pointing out challenges and successes, the authors illustrate team processes and successful strategies relative to recruitment of qualified members, training and team maintenance, and evaluation of team effectiveness. Method With relevant concepts from the literature applied to practical examples, the authors demonstrate how cultural team competence grows in a supportive work environment. PMID:18390824

  19. Researchers' experiences, positive and negative, in integrative landscape projects

    NARCIS (Netherlands)

    Tress, B.; Tress, G.; Fry, G.

    2005-01-01

    Integrative (interdisciplinary and transdisciplinary) landscape research projects are becoming increasingly common. As a result, researchers are spending a larger proportion of their professional careers doing integrative work, participating in shifting interdisciplinary teams, and cooperating

  20. Perspectives of Community Co-Researchers About Group Dynamics and Equitable Partnership Within a Community-Academic Research Team.

    Science.gov (United States)

    Vaughn, Lisa M; Jacquez, Farrah; Zhen-Duan, Jenny

    2018-04-01

    Equitable partnership processes and group dynamics, including individual, relational, and structural factors, have been identified as key ingredients to successful community-based participatory research partnerships. The purpose of this qualitative study was to investigate the key aspects of group dynamics and partnership from the perspectives of community members serving as co-researchers. Semistructured, in-depth interviews were conducted with 15 Latino immigrant co-researchers from an intervention project with Latinos Unidos por la Salud (LU-Salud), a community research team composed of Latino immigrant community members and academic investigators working in a health research partnership. A deductive framework approach guided the interview process and qualitative data analysis. The LU-Salud co-researchers described relationships, personal growth, beliefs/identity motivation (individual dynamics), coexistence (relational dynamics), diversity, and power/resource sharing (structural dynamics) as key foundational aspects of the community-academic partnership. Building on existing CBPR and team science frameworks, these findings demonstrate that group dynamics and partnership processes are fundamental drivers of individual-level motivation and meaning making, which ultimately sustain efforts of community partners to engage with the research team and also contribute to the achievement of intended research outcomes.

  1. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  2. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  3. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  4. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  5. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  6. Bridges and Barriers to Developing and Conducting Interdisciplinary Graduate-Student Team Research

    Directory of Open Access Journals (Sweden)

    Wayde Cameron. Morse

    2007-12-01

    Full Text Available Understanding complex socio-environmental problems requires specialists from multiple disciplines to integrate research efforts. Programs such as the National Science Foundation's Integrative Graduate Education and Research Traineeship facilitate integrated research efforts and change the way academic institutions train future leaders and scientists. The University of Idaho and the Tropical Agricultural Research and Higher Education Center in Costa Rica collaborate on a joint research program focusing on biodiversity conservation and sustainable production in fragmented landscapes. We first present a spectrum of integration ranging from disciplinary to transdisciplinary across seven aspects of the research process. We then describe our experiences and lessons learned conducting interdisciplinary graduate student team research. Using our program as a case study, we examine the individual, disciplinary, and programmatic bridges and barriers to conducting interdisciplinary research that emerged during our student team research projects. We conclude with a set of recommendations for exploiting the bridges and overcoming the barriers to conducting interdisciplinary research, especially as part of graduate education programs.

  7. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  8. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    relationship. Foci for future research opportunities include using: a) online data collection methods to improve participant adherence to similarity rating instructions; b) story or narratives during pre- and posttest similarity rating data collection to create common levels of contextual perception; and c) support to ensure charters are integrated into the full project life cycle, not just a pre-project one time isolated activity. Twenty five sections, on average, of EDSGN 100 are taught each spring and fall semester. Consistent instructor expectations are set for the technical aspects of the course. However, ideas to foster team effectiveness are often left to the discretion of the individual instructor. Implementing empirically tested team effectiveness instructional activities would bring consistency to EDGSN 100 curriculum. Other instructional activities that would be of benefit to engineering educators include qualitative inquiry---asking intrateam process questions (at the mid-point of the project) and in-class reflection---dedicated time, post project, to discuss what went well/not well within the team.

  9. The Team to Address Bariatric Care in Canadian Children (Team ABC3): Team Grant Research Proposal.

    Science.gov (United States)

    2017-10-05

    Severe obesity (SO) in Canadian children remains poorly understood. However, based on international data, the prevalence of SO appears to be increasing and is associated with a number of psychosocial, bio-mechanical, and cardiometabolic health risks. The purpose of our national Team to Address Bariatric Care in Canadian Children (Team ABC3) is to develop and lead a series of inter-related studies to enhance the understanding and management of SO in Canadian children and adolescents (0-18 years). From 2015 to 2019, Team ABC3 will conduct a series of projects at the regional, provincial, and national levels using multiple methods and study designs to respond to key knowledge gaps by (i) generating evidence on the prevalence of SO and its impact on health services utilization in children using existing Canadian data sources from primary care settings, (ii) exploring contemporary definitions of SO that link with health outcomes, (iii) comparing and contrasting health risks across the continuum of SO, (iv) understanding potential barriers to and facilitators of treatment success in children with SO, and (v) examining innovative lifestyle and behavioral interventions designed to successfully manage SO in children and their families. Furthermore, to examine the impact of innovative interventions on the management SO, we will (vi) evaluate whether adding a health coach, who provides support via text, email, and/or phone, improves children's ability to adhere to a web-based weight management program and (vii) test the feasibility and impact of a community-based weight management program for pre-school children with SO and their parents that combines group-based parenting sessions with in-home visits. Our research aligns with national priorities in obesity research, brings together leading scientists, clinicians, and stakeholders from across Canada, and will inform health services delivery throughout the country to provide the best care possible for children with SO and

  10. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  11. Managing Project Team in Local Government B.A. Amujiri Abstract ...

    African Journals Online (AJOL)

    Religion Dept

    government and discovered that managing project team is indispensable in local governments .... subordinate; improve employee motivation; improve communication between .... or events required in completing the project. This will help to.

  12. The Delta Cooperative Model: a Dynamic and Innovative Team-Work Activity to Develop Research Skills in Microbiology

    Directory of Open Access Journals (Sweden)

    Ivan Baez-Santos

    2006-12-01

    Full Text Available The Delta Cooperative Model (DCM is a dynamic and innovative teamwork design created to develop fundamentals in research skills. High school students in the DCM belong to the Upward Bound Science and Math (UBSM program at the Inter American University, Ponce Campus. After workshops on using the scientific method, students were organized into groups of three students with similar research interests. Each student had to take on a role within the group as either a researcher, data analyst, or research editor. Initially, each research team developed hypothesis-driven ideas on their proposed project. In intrateam research meetings, they emphasized team-specific tasks. Next, interteam meetings were held to present ideas and receive critical input. Finally, oral and poster research presentations were conducted at the UBSM science fair. Several team research projects covered topics in medical, environmental, and general microbiology. The three major assessment areas for the workshop and DCM included: (i student’s perception of the workshops’ effectiveness in developing skills, content, and values; (ii research team self- and group participation evaluation, and (iii oral and poster presentation during the science fair. More than 91% of the students considered the workshops effective in the presentation of scientific method fundamentals. The combination of the workshop and the DCM increased student’s knowledge by 55% from pre- to posttests. Two rubrics were designed to assess the oral presentation and poster set-up. The poster and oral presentation scores averaged 83%and 75%respectively. Finally, we present a team assessment instrument that allows the self- and group evaluation of each research team. While the DCM has educational plasticity and versatility, here we document how this model has been successfully incorporated in training and engaging students in scientific research in microbiology.

  13. The Delta Cooperative Model: a Dynamic and Innovative Team-Work Activity to Develop Research Skills in Microbiology

    Directory of Open Access Journals (Sweden)

    Carlos Rios-Velazquez

    2009-12-01

    Full Text Available The Delta Cooperative Model (DCM is a dynamic and innovative teamwork design created to develop fundamentals in research skills. High school students in the DCM belong to the Upward Bound Science and Math (UBSM program at the Inter American University, Ponce Campus. After workshops on using the scientific method, students were organized into groups of three students with similar research interests. Each student had to take on a role within the group as either a researcher, data analyst, or research editor. Initially, each research team developed hypothesis-driven ideas on their proposed project. In intrateam research meetings, they emphasized team-specific tasks. Next, interteam meetings were held to present ideas and receive critical input. Finally, oral and poster research presentations were conducted at the UBSM science fair. Several team research projects covered topics in medical, environmental, and general microbiology. The three major assessment areas for the workshop and DCM included: (i student’s perception of the workshops’ effectiveness in developing skills, content, and values; (ii research team self- and group participation evaluation, and (iii oral and poster presentation during the science fair. More than 91% of the students considered the workshops effective in the presentation of scientific method fundamentals. The combination of the workshop and the DCM increased student’s knowledge by 55% from pre- to posttests. Two rubrics were designed to assess the oral presentation and poster set-up. The poster and oral presentation scores averaged 83%and 75%respectively. Finally, we present a team assessment instrument that allows the self- and group evaluation of each research team. While the DCM has educational plasticity and versatility, here we document how this model has been successfully incorporated in training and engaging students in scientific research in microbiology.

  14. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    Science.gov (United States)

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  15. Team Members | Center for Cancer Research

    Science.gov (United States)

    Our Team Members The Foregut Team includes experts in the diagnosis and treatment of the diseases listed below. Our clinical experience and active research offers patients the highest quality care in the setting of groundbreaking clinical trials.

  16. The German joint research project "concepts for future gravity satellite missions"

    Science.gov (United States)

    Reubelt, Tilo; Sneeuw, Nico; Fichter, Walter; Müller, Jürgen

    2010-05-01

    Within the German joint research project "concepts for future gravity satellite missions", funded by the Geotechnologies programme of the German Federal Ministry of Education and Research, options and concepts for future satellite missions for precise (time-variable) gravity field recovery are investigated. The project team is composed of members from science and industry, bringing together experts in geodesy, satellite systems, metrology, sensor technology and control systems. The majority of team members already contributed to former gravity missions. The composition of the team guarantees that not only geodetic aspects and objectives are investigated, but also technological and financial constraints are considered. Conversely, satellite, sensor and system concepts are developed and improved in a direct exchange with geodetic and scientific claims. The project aims to develop concepts for both near and mid-term future satellite missions, taking into account e.g. advanced satellite formations and constellations, improved orbit design, innovative metrology and sensor systems and advances in satellite systems.

  17. Team Structure and Scientific Impact of "Big Science" Research

    DEFF Research Database (Denmark)

    Lauto, Giancarlo; Valentin, Finn; Jeppesen, Jacob

    This paper summarizes preliminary results from a project studying how the organizational and cognitive features of research carried out in a Large Scale Research Facility (LSRF) affect scientific impact. The study is based on exhaustive bibliometric mapping of the scientific publications...... of the Neutron Science Department of Oak Ridge National Laboratories in 2006-2009. Given the collaborative nature of research carried out at LSRFs, it is important to understand how its organization affects scientific impact. Diversity of teams along the institutional and cognitive dimensions affects both...... opportunities for combination of knowledge and coordination costs. The way specific collaborative configurations strike this trade-offs between these opportunities and costs have notable effects on research performance. The findings of the paper show that i.) scientists combining affiliations to both...

  18. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  19. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  20. Creating and supporting a mixed methods health services research team.

    Science.gov (United States)

    Bowers, Barbara; Cohen, Lauren W; Elliot, Amy E; Grabowski, David C; Fishman, Nancy W; Sharkey, Siobhan S; Zimmerman, Sheryl; Horn, Susan D; Kemper, Peter

    2013-12-01

    To use the experience from a health services research evaluation to provide guidance in team development for mixed methods research. The Research Initiative Valuing Eldercare (THRIVE) team was organized by the Robert Wood Johnson Foundation to evaluate The Green House nursing home culture change program. This article describes the development of the research team and provides insights into how funders might engage with mixed methods research teams to maximize the value of the team. Like many mixed methods collaborations, the THRIVE team consisted of researchers from diverse disciplines, embracing diverse methodologies, and operating under a framework of nonhierarchical, shared leadership that required new collaborations, engagement, and commitment in the context of finite resources. Strategies to overcome these potential obstacles and achieve success included implementation of a Coordinating Center, dedicated time for planning and collaborating across researchers and methodologies, funded support for in-person meetings, and creative optimization of resources. Challenges are inevitably present in the formation and operation of effective mixed methods research teams. However, funders and research teams can implement strategies to promote success. © Health Research and Educational Trust.

  1. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  2. Using Replication Projects in Teaching Research Methods

    Science.gov (United States)

    Standing, Lionel G.; Grenier, Manuel; Lane, Erica A.; Roberts, Meigan S.; Sykes, Sarah J.

    2014-01-01

    It is suggested that replication projects may be valuable in teaching research methods, and also address the current need in psychology for more independent verification of published studies. Their use in an undergraduate methods course is described, involving student teams who performed direct replications of four well-known experiments, yielding…

  3. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shupla, C.; Shipp, S.; Allen, J.; Kring, D. A.

    2013-01-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA s Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA s and NLSI s objective to train the next generation of scientists, CLSE s High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 168 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research in person.

  4. Balancing creativity and time efficiency in multi-team R&D projects : the alignment of formal and informal networks

    NARCIS (Netherlands)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    The business world is denoted by an increasing number of multi-team research and development (R&D) projects, however, managerial knowledge about how to run them successfully is scarce. The present study attempts to shed light at this kind of projects by investigating the alignment of formal and

  5. Team research methods for studying intranasal heroin use and its HIV risks.

    Science.gov (United States)

    Ouellet, L J; Wiebel, W W; Jimenez, A D

    1995-01-01

    Nineteen years ago Douglas (1976), a sociologist, vigorously recommended team field research. As Douglas noted, most ethnography is carried out using the "Lone Ranger" approach, which--while producing a number of excellent studies--generally limits the researcher to small groups or parts of large groups. In the few cases where field research teams were assembled (e.g., Becker et al. 1961), they tended to be homogeneous and to simply divide the group being studied between them and then essentially perform identical investigations (Douglas 1976). Douglas had a different vision. He saw the optimal field research group as heterogeneous, able to take on large projects, and able to take multiple perspectives. Such a team would have a variety of talents, experiences, and inclinations to call upon and would be more able to connect with the people being studied (e.g., by including indigenous members noted for their sociability). Douglas argued for giving greater consideration in designing research to society's conflictory nature and the desire and need for people to misinform, evade, construct false fronts, lie, and deceive themselves. According to Douglas, field research teams were an excellent means of coping with these problems. With various members using their array of talents to study a problem from multiple perspectives and through numerous webs of social cliques and networks, research teams would be particularly able to get behind people's facades and produce valid data. Though Douglas presented a compelling argument, there is little evidence of an increase in team field research, with one exception: research groups studying HIV/AIDS. The NADR program, funded by NIDA, created a number of field research teams across the United States that combined ethnographers with indigenous staff who, whatever their principal duties, could be used to assist in the research. These field research teams were also part of a survey research effort, and, in this fashion, quantitative and

  6. Dynamics of Research Team Formation in Complex Networks

    Science.gov (United States)

    Sun, Caihong; Wan, Yuzi; Chen, Yu

    Most organizations encourage the formation of teams to accomplish complicated tasks, and vice verse, effective teams could bring lots benefits and profits for organizations. Network structure plays an important role in forming teams. In this paper, we specifically study the dynamics of team formation in large research communities in which knowledge of individuals plays an important role on team performance and individual utility. An agent-based model is proposed, in which heterogeneous agents from research communities are described and empirically tested. Each agent has a knowledge endowment and a preference for both income and leisure. Agents provide a variable input (‘effort’) and their knowledge endowments to production. They could learn from others in their team and those who are not in their team but have private connections in community to adjust their own knowledge endowment. They are allowed to join other teams or work alone when it is welfare maximizing to do so. Various simulation experiments are conducted to examine the impacts of network topology, knowledge diffusion among community network, and team output sharing mechanisms on the dynamics of team formation.

  7. Performance of Student Software Development Teams: The Influence of Personality and Identifying as Team Members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms…

  8. Highly effective cystic fibrosis clinical research teams: critical success factors.

    Science.gov (United States)

    Retsch-Bogart, George Z; Van Dalfsen, Jill M; Marshall, Bruce C; George, Cynthia; Pilewski, Joseph M; Nelson, Eugene C; Goss, Christopher H; Ramsey, Bonnie W

    2014-08-01

    Bringing new therapies to patients with rare diseases depends in part on optimizing clinical trial conduct through efficient study start-up processes and rapid enrollment. Suboptimal execution of clinical trials in academic medical centers not only results in high cost to institutions and sponsors, but also delays the availability of new therapies. Addressing the factors that contribute to poor outcomes requires novel, systematic approaches tailored to the institution and disease under study. To use clinical trial performance metrics data analysis to select high-performing cystic fibrosis (CF) clinical research teams and then identify factors contributing to their success. Mixed-methods research, including semi-structured qualitative interviews of high-performing research teams. CF research teams at nine clinical centers from the CF Foundation Therapeutics Development Network. Survey of site characteristics, direct observation of team meetings and facilities, and semi-structured interviews with clinical research team members and institutional program managers and leaders in clinical research. Critical success factors noted at all nine high-performing centers were: 1) strong leadership, 2) established and effective communication within the research team and with the clinical care team, and 3) adequate staff. Other frequent characteristics included a mature culture of research, customer service orientation in interactions with study participants, shared efficient processes, continuous process improvement activities, and a businesslike approach to clinical research. Clinical research metrics allowed identification of high-performing clinical research teams. Site visits identified several critical factors leading to highly successful teams that may help other clinical research teams improve clinical trial performance.

  9. Serious Games are a Serious Tool for Team Research

    Directory of Open Access Journals (Sweden)

    Michael D. Coovert

    2017-03-01

    Full Text Available Serious games are an attractive tool for education and training, but their utility is even broader. We argue serious games provide a unique opportunity for research as well, particularly in areas where multiple players (groups or teams are involved. In our paper we provide background in several substantive areas. First, we outline major constructs and challenges found in team research. Secondly, we discuss serious games, providing an overview and description of their role in education, training, and research. Thirdly, we describe necessary characteristics for game engines utilized in team research, followed by a discussion of the value added by utilizing serious games. Our goal in this paper is to argue serious games are an effective tool with demonstrated reliability and validity and should be part of a research program for those engaged in team research. Both team researchers and those involved in serious game development can benefit from a mutual partnership which is research focused.

  10. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  11. The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance

    Science.gov (United States)

    2016-06-30

    AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT

  12. Task versus relationship conflict, team performance, and team member satisfaction: a meta-analysis.

    Science.gov (United States)

    De Dreu, Carsten K W; Weingart, Laurie R

    2003-08-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, results revealed strong and negative correlations between relationship conflict, team performance, and team member satisfaction. In contrast to what has been suggested in both academic research and introductory textbooks, however, results also revealed strong and negative (instead of the predicted positive) correlations between task conflict team performance, and team member satisfaction. As predicted, conflict had stronger negative relations with team performance in highly complex (decision making, project, mixed) than in less complex (production) tasks. Finally, task conflict was less negatively related to team performance when task conflict and relationship conflict were weakly, rather than strongly, correlated.

  13. Experiences with project-oriented research in graduate engineering education

    International Nuclear Information System (INIS)

    Miley, G.H.

    1976-01-01

    Two examples of project-oriented research that involve the conceptual design of fusion systems are described. One of these projects involved close collaboration with workers in a national laboratory while the second was formally organized as a cooperative effort with two other laboratories. An important educational aspect of such research is that the students are involved in a design team composed of both students and professionals facing a realistic problem. In retrospect, it appears that both students and faculty profited from the experience. Several students have taken jobs in related areas, and additional research has resulted at the University from new insight gained during the projects

  14. Leading multi-professional teams in the children's workforce: an action research project.

    Science.gov (United States)

    Stuart, Kaz

    2012-01-01

    The 2004 Children Act in the UK saw the introduction of integrated working in children's services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. The paper concludes that trust and relational agency are central to effective leadership of multi professional teams.

  15. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  16. Reaping the benefits of task conflict in teams: the critical role of team psychological safety climate.

    Science.gov (United States)

    Bradley, Bret H; Postlethwaite, Bennett E; Klotz, Anthony C; Hamdani, Maria R; Brown, Kenneth G

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance. Using evidence from 117 project teams, the present research found that psychological safety climate moderates the relationship between task conflict and performance. Specifically, task conflict and team performance were positively associated under conditions of high psychological safety. The results support the conclusion that psychological safety facilitates the performance benefits of task conflict in teams. Theoretical implications and suggestions for future research are discussed.

  17. Barriers and Solutions to Conducting Large International, Interdisciplinary Research Projects

    Science.gov (United States)

    Pischke, Erin C.; Knowlton, Jessie L.; Phifer, Colin C.; Gutierrez Lopez, Jose; Propato, Tamara S.; Eastmond, Amarella; de Souza, Tatiana Martins; Kuhlberg, Mark; Picasso Risso, Valentin; Veron, Santiago R.; Garcia, Carlos; Chiappe, Marta; Halvorsen, Kathleen E.

    2017-12-01

    Global environmental problems such as climate change are not bounded by national borders or scientific disciplines, and therefore require international, interdisciplinary teamwork to develop understandings of their causes and solutions. Interdisciplinary scientific work is difficult enough, but these challenges are often magnified when teams also work across national boundaries. The literature on the challenges of interdisciplinary research is extensive. However, research on international, interdisciplinary teams is nearly non-existent. Our objective is to fill this gap by reporting on results from a study of a large interdisciplinary, international National Science Foundation Partnerships for International Research and Education (NSF-PIRE) research project across the Americas. We administered a structured questionnaire to team members about challenges they faced while working together across disciplines and outside of their home countries in Argentina, Brazil, and Mexico. Analysis of the responses indicated five major types of barriers to conducting interdisciplinary, international research: integration, language, fieldwork logistics, personnel and relationships, and time commitment. We discuss the causes and recommended solutions to the most common barriers. Our findings can help other interdisciplinary, international research teams anticipate challenges, and develop effective solutions to minimize the negative impacts of these barriers to their research.

  18. Barriers and Solutions to Conducting Large International, Interdisciplinary Research Projects.

    Science.gov (United States)

    Pischke, Erin C; Knowlton, Jessie L; Phifer, Colin C; Gutierrez Lopez, Jose; Propato, Tamara S; Eastmond, Amarella; de Souza, Tatiana Martins; Kuhlberg, Mark; Picasso Risso, Valentin; Veron, Santiago R; Garcia, Carlos; Chiappe, Marta; Halvorsen, Kathleen E

    2017-12-01

    Global environmental problems such as climate change are not bounded by national borders or scientific disciplines, and therefore require international, interdisciplinary teamwork to develop understandings of their causes and solutions. Interdisciplinary scientific work is difficult enough, but these challenges are often magnified when teams also work across national boundaries. The literature on the challenges of interdisciplinary research is extensive. However, research on international, interdisciplinary teams is nearly non-existent. Our objective is to fill this gap by reporting on results from a study of a large interdisciplinary, international National Science Foundation Partnerships for International Research and Education (NSF-PIRE) research project across the Americas. We administered a structured questionnaire to team members about challenges they faced while working together across disciplines and outside of their home countries in Argentina, Brazil, and Mexico. Analysis of the responses indicated five major types of barriers to conducting interdisciplinary, international research: integration, language, fieldwork logistics, personnel and relationships, and time commitment. We discuss the causes and recommended solutions to the most common barriers. Our findings can help other interdisciplinary, international research teams anticipate challenges, and develop effective solutions to minimize the negative impacts of these barriers to their research.

  19. Diversity in research projects - A key to success?

    Science.gov (United States)

    Henkel, Daniela; Eisenhauer, Anton; Taubner, Isabelle

    2017-04-01

    According to demographers, psychologists, sociologists and economists diverse groups, which are groups of different race, ethnicity, gender and sexual orientation, are more innovative than homogeneous groups. This is also true for groups working together in research collaborations and international cooperation involving a culturally and functionally diverse mix of individuals who have to be integrated into an effective unit - a project team. If the goal is scientific excellence, diversity should be an essential ingredient to conduct science on high level productivity, quality and innovation. Effective teamwork is a key to project success and prime responsibilities of the project manager. Therefore, the project manager has to take into consideration different characteristics such as cultures, languages, and different values related to individual project partners. Here we show how diversity can affect the performance of a research project. Furthermore, the presentation indicates skills and abilities which are required for the management in order to deal also with the challenges of diversity in research projects. The presentation is based on insights experienced in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program and TRION a Collaborative Research Project in the Framework of the Trilateral Program of the German Research Foundation.

  20. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    Science.gov (United States)

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  1. [Dream Team--a pre-graduate surgical talent development project].

    Science.gov (United States)

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  2. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  3. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  4. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  5. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  6. Dearfield Dream Project: Developing an Interdisciplinary Historical/Cultural Research Network

    Directory of Open Access Journals (Sweden)

    Robert Brunswig

    2013-08-01

    Full Text Available The Dearfield Dream Project is a collaborative research initiative to conduct historical, cultural, archaeological, and environmental studies on the early 20th Century African-American colony site of Dearfield, Colorado, USA. Because the breadth and significance of the Dearfield Project requires an interdisciplinary research team, a network of research collaborators has been assembled. This research network seeks to discover, preserve, and disseminate knowledge of the site and its surrounding farmsteads’ economic, social, political, and environmental history for better understanding and interpretation of its contributions to Colorado and U.S. history. Herein, we detail progress that has been made on this important historical/cultural research project. Further, we outline the future of the Dearfield research network along with our current and anticipated subjects of inquiry.

  7. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  8. Pedagogical innovation in teacher teams

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2015-01-01

    This paper presents findings from a longitudinal design-based research project examining how to enable reflection and pedagogical innovation in teacher teams. The article identifies and analyses the teachers’ learning trajectories and innovative strategies when working together in the IT...... learning designs, the research aims to clarify what kind of knowledge is being developed and shared in the teacher teams, and how this contributes to the organisational learning process. The context is Global Classroom, an innovative synchronous hybrid videoconference concept, where adult students can......-pedagogical Think Tank for Teacher Teams (after this: ITP4T) (Weitze, 2014a), a competence development model, which was developed in an earlier phase of the research project. By using theoretical lenses from innovative knowledge development frameworks to examine the teachers’ utterances, interactions and new...

  9. Research teams as complex systems: implications for knowledge management

    NARCIS (Netherlands)

    Vasileiadou, E.

    2012-01-01

    The recent increase in research collaboration creates the need to better understand the interaction between individual researchers and the collaborative team. The paper elaborates the conceptualisation of research teams as complex systems which emerge out of the local interactions of individual

  10. The PALLAS research and isotope reactor project status

    International Nuclear Information System (INIS)

    Van Der Schaaf, B.; De Jong, P.

    2010-01-01

    In the European Union the first generation research reactors is nearing their end of life condition. Several committees recommend a comprehensive set of reactors in the EU, amongst them the replacement for the HFR research and isotope reactor in Petten: PALLAS. The business case for PALLAS supports a future for a research and isotope reactor in Petten as a perfect fit for the future EU set of test reactors. The tender for PALLAS started in 2007, following the EU rules for tendering complex objects with the competitive dialogue. This procedure involved an extensive consultation phase between individual tendering companies and NRG, resulting in definitive specifications in summer 2008. The evaluation of offers, including conceptual designs, took place in summer 2009. At present NRG is still active in the acquisition of the funding for the project. The licensing path has been started in autumn 2009 with a initiation note on the environmental impact assessment, EIA. The public hearings held in the lead to the advice from the national EIA committee for the approach of the assessment. The PALLAS project team in Petten will guide the design and build processes. It is also responsible for the licensing of the building and operation of PALLAS. The team also manages the design and construction for the infrastructure, such as cooling devices, including remnant heat utilization, and utility provisions. A particular responsibility for the team is the design and construction of experimental and isotope capsules, based on launch customer requirements. (author)

  11. The Planning Task for Teams (PLATT): An environment for research on planning and decision making in teams

    NARCIS (Netherlands)

    Kamphuis, W.; Houttuin, K.

    2007-01-01

    In this report, we introduce a newly developed task environment for experimental team research: the Planning Task for Teams (PLATT). PLATT is a scenario based, computerized, complex planning task for three-person teams. PLATT has been designed to be able to do experimental laboratory research on

  12. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  13. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  14. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  15. Tiger Team Assessment of the National Institute for Petroleum and Energy Research

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the Tiger Team Assessment of the National Institute for Petroleum and Energy Research (NIPER) and the Bartlesville Project Office (BPO) of the Department of Energy (DOE), co-located in Bartlesville, Oklahoma. The assessment investigated the status of the environmental, safety, and health (ES ampersand H) programs of the two organizations. The Tiger Team Assessment was conducted from April 6 to May 1, 1992, under the auspices of DOE's Office of Special Projects (OSP) in the Office of the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health issues; management practices; quality assurance; and NIPER and BPO self-assessments. Compliance with Federal, state, and local regulations; DOE Orders; best management practices; and internal IITRI requirements was assessed. In addition, an evaluation was conducted of the adequacy and effectiveness of BPO and IITRI management of the ES ampersand H and self-assessment processes. The NIPER/BPO Tiger Team Assessment is part of a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary with information on the compliance status of DOE facilities with regard to ES ampersand H requirements, root causes for noncompliance, adequacy of DOE and contractor ES ampersand H management programs, response actions to address the identified problem areas, and DOE-wide ES ampersand H compliance trends and root causes

  16. The programme benefits of improving project team communication through a contact centre

    Directory of Open Access Journals (Sweden)

    Bond-Barnard, T. J.

    2013-08-01

    Full Text Available A South African national programme to repair government infrastructure uses a contact centre (or call centre to facilitate and manage communication. An important question is: How does the contact centre benefit the programme and its projects? This study discusses the findings of a survey that quantified the benefits of the programme when the communication between team members in the programme was improved by using a contact centre. The results show that, by using a contact centre to improve the communication between project team members, their perception of communication effectiveness, quality of project deliverables, service delivery, and customer satisfaction of the programme dramatically increases.

  17. [Team training and assessment in mixed reality-based simulated operating room : Current state of research in the field of simulation in spine surgery exemplified by the ATMEOS project].

    Science.gov (United States)

    Stefan, P; Pfandler, M; Wucherer, P; Habert, S; Fürmetz, J; Weidert, S; Euler, E; Eck, U; Lazarovici, M; Weigl, M; Navab, N

    2018-04-01

    Surgical simulators are being increasingly used as an attractive alternative to clinical training in addition to conventional animal models and human specimens. Typically, surgical simulation technology is designed for the purpose of teaching technical surgical skills (so-called task trainers). Simulator training in surgery is therefore in general limited to the individual training of the surgeon and disregards the participation of the rest of the surgical team. The objective of the project Assessment and Training of Medical Experts based on Objective Standards (ATMEOS) is to develop an immersive simulated operating room environment that enables the training and assessment of multidisciplinary surgical teams under various conditions. Using a mixed reality approach, a synthetic patient model, real surgical instruments and radiation-free virtual X‑ray imaging are combined into a simulation of spinal surgery. In previous research studies, the concept was evaluated in terms of realism, plausibility and immersiveness. In the current research, assessment measurements for technical and non-technical skills are developed and evaluated. The aim is to observe multidisciplinary surgical teams in the simulated operating room during minimally invasive spinal surgery and objectively assess the performance of the individual team members and the entire team. Moreover, the effectiveness of training methods and surgical techniques or success critical factors, e. g. management of crisis situations, can be captured and objectively assessed in the controlled environment.

  18. A Multidisciplinary Research Team Approach to Computer-Aided Drafting (CAD) System Selection. Final Report.

    Science.gov (United States)

    Franken, Ken; And Others

    A multidisciplinary research team was assembled to review existing computer-aided drafting (CAD) systems for the purpose of enabling staff in the Design Drafting Department at Linn Technical College (Missouri) to select the best system out of the many CAD systems in existence. During the initial stage of the evaluation project, researchers…

  19. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  20. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  1. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  2. Team-client Relationships And Extreme Programming

    Directory of Open Access Journals (Sweden)

    John Karn

    2008-01-01

    Full Text Available This paper describes a study that examined the relationship between software engineering teams who adhered to the extreme programming (XP methodology and their project clients. The study involved observing teams working on projects for clients who had commissioned a piece of software to be used in the real world. Interviews were conducted during and at the end of the project to get client opinion on how the project had progressed. Of interest to the researchers were opinions on frequency of feedback, how the team captured requirements, whether or not the iterative approach of XP proved to be helpful, and the level of contextual and software engineering knowledge the client had at the start of the project. In theory, fidelity to XP should result in enhanced communication, reduce expectation gaps, and lead to greater client satisfaction. Our results suggest that this depends heavily on the communication skills of the team and of the client, the expectations of the client, and the nature of the project.

  3. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shipp, S. S.; Allen, J.; Kring, D. A.

    2012-12-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA's Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA's and NLSI's objective to train the next generation of scientists, CLSE's High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 140 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research. Three instruments have been developed or modified to evaluate the extent to which the High School Lunar Research Projects meets its objectives. These three instruments measure changes in student views of the nature of science, attitudes towards science and science careers, and knowledge of lunar science. Exit surveys for teachers, students, and mentors were also developed to elicit general feedback about the program and its impact. The nature of science

  4. A conceptual model to improve performance in virtual teams

    Directory of Open Access Journals (Sweden)

    Shopee Dube

    2016-09-01

    Full Text Available Background: The vast improvement in communication technologies and sophisticated project management tools, methods and techniques has allowed geographically and culturally diverse groups to operate and function in a virtual environment. To succeed in this virtual environment where time and space are becoming increasingly irrelevant, organisations must define new ways of implementing initiatives. This virtual environment phenomenon has brought about the formation of virtual project teams that allow organisations to harness the skills and knowhow of the best resources, irrespective of their location. Objectives: The aim of this article was to investigate performance criteria and develop a conceptual model which can be applied to enhance the success of virtual project teams. There are no clear guidelines of the performance criteria in managing virtual project teams. Method: A qualitative research methodology was used in this article. The purpose of content analysis was to explore the literature to understand the concept of performance in virtual project teams and to summarise the findings of the literature reviewed. Results: The research identified a set of performance criteria for the virtual project teams as follows: leadership, trust, communication, team cooperation, reliability, motivation, comfort and social interaction. These were used to conceptualise the model. Conclusion: The conceptual model can be used in a holistic way to determine the overall performance of the virtual project team, but each factor can be analysed individually to determine the impact on the overall performance. The knowledge of performance criteria for virtual project teams could aid project managers in enhancing the success of these teams and taking a different approach to better manage and coordinate them.

  5. Leading multi-professional teams in the children’s workforce: an action research project

    Directory of Open Access Journals (Sweden)

    Karen Stuart

    2012-01-01

    Full Text Available Introduction: The 2004 Children Act in the UK saw the introduction of integrated working in children's services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice.Methods: A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating?Results: When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research.Conclusion: The paper concludes that trust and relational agency are central to effective leadership of multi professional teams.

  6. Leading multi-professional teams in the children’s workforce: an action research project

    Directory of Open Access Journals (Sweden)

    Karen Stuart

    2012-01-01

    Full Text Available Introduction: The 2004 Children Act in the UK saw the introduction of integrated working in children's services. A raft of change followed with processes designed to make joint working easier, and models and theories to support the development of integrated work. This paper explores the links between key concepts and practice. Methods: A practitioner action research approach is taken using an autoethnographic account kept over six months. The research question was, to what extent is this group collaborating? Results: When the architecture of practice was revealed, differences between espoused and real practice could be seen. Whilst understanding and displaying the outward signs of an effective multi professional group, the individuals did not trust one another. This was exhibited by covert interprofessional issues. As a result, collaborative inertia was achieved. This realisation prompted them to participate in further developmental and participative action research. Conclusion: The paper concludes that trust and relational agency are central to effective leadership of multi professional teams.

  7. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  8. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    or pre-arranged at random. Therefore we investigate the importance of team formation in the entrepreneurial classroom and ask: (i) What are the underlying factors that influence outcomes of teamwork in student groups? (ii) How does team formation influence student perception of learning?, and (iii) Do...... different team formation strategies produce different teamwork and learning outcomes? Approach: We employed a multiple case study design comprising of 38 student teams to uncover potential links between team formation and student perception of learning. This research draws on data from three different....... A rigorous coding and inductive analysis process was undertaken. Pattern and relationship coding were used to reveal underlying factors, which helped to unveil important similarities and differences between student in different teams’ project progress and perception of learning. Results: When students...

  9. Concurrent Mission and Systems Design at NASA Glenn Research Center: The Origins of the COMPASS Team

    Science.gov (United States)

    McGuire, Melissa L.; Oleson, Steven R.; Sarver-Verhey, Timothy R.

    2012-01-01

    Established at the NASA Glenn Research Center (GRC) in 2006 to meet the need for rapid mission analysis and multi-disciplinary systems design for in-space and human missions, the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team is a multidisciplinary, concurrent engineering group whose primary purpose is to perform integrated systems analysis, but it is also capable of designing any system that involves one or more of the disciplines present in the team. The authors were involved in the development of the COMPASS team and its design process, and are continuously making refinements and enhancements. The team was unofficially started in the early 2000s as part of the distributed team known as Team JIMO (Jupiter Icy Moons Orbiter) in support of the multi-center collaborative JIMO spacecraft design during Project Prometheus. This paper documents the origins of a concurrent mission and systems design team at GRC and how it evolved into the COMPASS team, including defining the process, gathering the team and tools, building the facility, and performing studies.

  10. Tinkering self-efficacy and team interaction on freshman engineering design teams

    Science.gov (United States)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition

  11. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  12. Shared Authentic Leadership in Research Teams: Testing a Multiple Mediation Model.

    Science.gov (United States)

    Guenter, Hannes; Gardner, William L; Davis McCauley, Kelly; Randolph-Seng, Brandon; Prabhu, Veena P

    2017-12-01

    Research teams face complex leadership and coordination challenges. We propose shared authentic leadership (SAL) as a timely approach to addressing these challenges. Drawing from authentic and functional leadership theories, we posit a multiple mediation model that suggests three mechanisms whereby SAL influences team effectiveness: shared mental models (SMM), team trust, and team coordination. To test our hypotheses, we collected survey data on leadership and teamwork within 142 research teams that recently published an article in a peer-reviewed management journal. The results indicate team coordination represents the primary mediating mechanism accounting for the relationship between SAL and research team effectiveness. While teams with high trust and SMM felt more successful and were more satisfied, they were less successful in publishing in high-impact journals. We also found the four SAL dimensions (i.e., self-awareness, relational transparency, balanced processing, and internalized moral perspective) to associate differently with team effectiveness.

  13. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  14. The Undergraduate ALFALFA Team: A Model for Involving Undergraduates in Major Legacy Astronomy Research

    Science.gov (United States)

    Troischt, Parker; Koopmann, Rebecca A.; Haynes, Martha P.; Higdon, Sarah; Balonek, Thomas J.; Cannon, John M.; Coble, Kimberly A.; Craig, David; Durbala, Adriana; Finn, Rose; Hoffman, G. Lyle; Kornreich, David A.; Lebron, Mayra E.; Crone-Odekon, Mary; O'Donoghue, Aileen A.; Olowin, Ronald Paul; Pantoja, Carmen; Rosenberg, Jessica L.; Venkatesan, Aparna; Wilcots, Eric M.; Alfalfa Team

    2015-01-01

    The NSF-sponsored Undergraduate ALFALFA (Arecibo Legacy Fast ALFA) Team (UAT) is a consortium of 19 institutions founded to promote undergraduate research and faculty development within the extragalactic ALFALFA HI blind survey project and follow-up programs. The collaborative nature of the UAT allows faculty and students from a wide ​range of public and private colleges and especially those with small astronomy programs to develop scholarly collaborations. Components of the program include an annual undergraduate workshop at Arecibo Observatory, observing runs at Arecibo, computer infrastructure, summer and academic year research projects, and dissemination at national meetings (e.g., Alfvin et al., Martens et al., Sanders et al., this meeting). Through this model, faculty and students are learning how science is accomplished in a large collaboration while contributing to the scientific goals of a major legacy survey. In the 7 years of the program, 23 faculty and more than 220 undergraduate students have participated at a significant level. 40% of them have been women and members of underrepresented groups. Faculty, many of whom were new to the collaboration and had expertise in other fields, contribute their diverse sets of skills to ALFALFA ​related projects via observing, data reduction, collaborative research, and research with students. 142 undergraduate students have attended the annual workshops at Arecibo Observatory, interacting with faculty, graduate students, their peers, and Arecibo staff in lectures, group activities, tours, and observing runs. Team faculty have supervised 131 summer research projects and 94 academic year (e.g., senior thesis) projects. 62 students have traveled to Arecibo Observatory for observing runs and 46 have presented their results at national meetings. 93% of alumni are attending graduate school and/or pursuing a career in STEM. Half of those pursuing graduate degrees in Physics or Astronomy are women. This work has been

  15. Group functioning of a collaborative family research team.

    Science.gov (United States)

    Johnson, S K; Halm, M A; Titler, M G; Craft, M; Kleiber, C; Montgomery, L A; Nicholson, A; Buckwalter, K; Cram, E

    1993-07-01

    Collaborative research teams are an attractive means of conducting nursing research in the clinical setting because of the many opportunities that collaboration can supply. These opportunities include a chance to: (1) network with other nurses who have similar interests, (2) share knowledge and expertise for designing clinical studies that directly affect daily practice, (3) develop instruments, (4) write grant proposals, (5) collect and analyze data, and (6) prepare manuscripts for publication. The effectiveness of research teams, however, is strongly influenced by group functioning. This article describes the functioning of a collaborative family interventions research team of nursing faculty members and CNSs at a large Midwestern university setting. The formation of the group and membership characteristics are described, along with strategies used to identify the research focus and individual and group goals. Aspects related to the influence of the group on members and the internal operations of the group are also addressed. Future strategies to be explored will focus on the size of the group and joint authorship issues. The authors also set forth a number of recommendations for development of collaborative research groups.

  16. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  17. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  18. Modeling and Analysis of Multidiscipline Research Teams at NASA Langley Research Center: A Systems Thinking Approach

    Science.gov (United States)

    Waszak, Martin R.; Barthelemy, Jean-Francois; Jones, Kenneth M.; Silcox, Richard J.; Silva, Walter A.; Nowaczyk, Ronald H.

    1998-01-01

    Multidisciplinary analysis and design is inherently a team activity due to the variety of required expertise and knowledge. As a team activity, multidisciplinary research cannot escape the issues that affect all teams. The level of technical diversity required to perform multidisciplinary analysis and design makes the teaming aspects even more important. A study was conducted at the NASA Langley Research Center to develop a model of multidiscipline teams that can be used to help understand their dynamics and identify key factors that influence their effectiveness. The study sought to apply the elements of systems thinking to better understand the factors, both generic and Langley-specific, that influence the effectiveness of multidiscipline teams. The model of multidiscipline research teams developed during this study has been valuable in identifying means to enhance team effectiveness, recognize and avoid problem behaviors, and provide guidance for forming and coordinating multidiscipline teams.

  19. The Perspective of Women Managing Research Teams in Social Sciences

    Science.gov (United States)

    Tomas, Marina; Castro, Diego

    2013-01-01

    This article presents a research study that focuses on how women manage research teams. More specifically, the study aims to ascertain the perception of female researchers who are leaders of research groups in social sciences with regard to the formation, operation and management of their research teams. Fifteen interviews were carried out, eight…

  20. Bringing Students out of the Classroom and into Research Projects: An Undergraduate Team Research (UTR) Program at the University of Southern California

    Science.gov (United States)

    Cox, I. V.; Quirk, M.; Culbert, K. N.; Whitesides, A. S.; Sun, H.; Black, C. J.; Cao, W.; Zhang, T.; Paterson, S. R.; Memeti, V.; Anderson, J. L.

    2010-12-01

    In 2006, USC Earth Sciences professors Paterson and Anderson created the Undergraduate Team Research (UTR) program, a year-long, multidisciplinary, learner-centered, student research experience. This program is open to all USC undergraduate students, but has also involved a few outstanding undergraduate students from other universities. Since its inception the 47 participants have been a diverse group: 53% women, ~17% minorities, and 43% non-Earth Science majors. To date, 15 abstracts written by UTR participants have been presented at national GSA and AGU meetings and several research papers for publication are in preparation. 12 presentations have been produced at University-sponsored research symposia and culminated in a number of senior theses. The central component of this program is a field-based research experience which involves several weeks of geologic mapping in various locations around the world. During the summer expedition, participants organize themselves into 3-4 person mapping teams consisting of a mix of undergraduate geology majors, non-majors, and mentors (professors and graduate students). At the end of each day, student researchers (with limited mentoring) work together to draft a geologic map while discussing their findings, formulating hypotheses about possible geologic histories, and planning research goals and organizing mapping teams for the next day. Throughout the following academic year, the student researchers continue to work in teams to digitize their geologic map, decide which analyses need to be done, and prepare collected rock samples for various structural, geochemical, and geochronologic studies. Most student researchers agree that they learned more in a few weeks than they often did in an entire semester course. What aspects of the UTR program elicit these high-yield results, even for non-majors that can be applied to other learning environments? We speculate that three critical elements are important: (1) The most notable is

  1. MD-11 PCA - Research flight team photo

    Science.gov (United States)

    1995-01-01

    On Aug. 30, 1995, a the McDonnell Douglas MD-11 transport aircraft landed equipped with a computer-assisted engine control system that has the potential to increase flight safety. In landings at NASA Dryden Flight Research Center, Edwards, California, on August 29 and 30, the aircraft demonstrated software used in the aircraft's flight control computer that essentially landed the MD-11 without a need for the pilot to manipulate the flight controls significantly. In partnership with McDonnell Douglas Aerospace (MDA), with Pratt & Whitney and Honeywell helping to design the software, NASA developed this propulsion-controlled aircraft (PCA) system following a series of incidents in which hydraulic failures resulted in the loss of flight controls. This new system enables a pilot to operate and land the aircraft safely when its normal, hydraulically-activated control surfaces are disabled. This August 29, 1995, photo shows the MD-11 team. Back row, left to right: Tim Dingen, MDA pilot; John Miller, MD-11 Chief pilot (MDA); Wayne Anselmo, MD-11 Flight Test Engineer (MDA); Gordon Fullerton, PCA Project pilot; Bill Burcham, PCA Chief Engineer; Rudey Duran, PCA Controls Engineer (MDA); John Feather, PCA Controls Engineer (MDA); Daryl Townsend, Crew Chief; Henry Hernandez, aircraft mechanic; Bob Baron, PCA Project Manager; Don Hermann, aircraft mechanic; Jerry Cousins, aircraft mechanic; Eric Petersen, PCA Manager (Honeywell); Trindel Maine, PCA Data Engineer; Jeff Kahler, PCA Software Engineer (Honeywell); Steve Goldthorpe, PCA Controls Engineer (MDA). Front row, left to right: Teresa Hass, Senior Project Management Analyst; Hollie Allingham (Aguilera), Senior Project Management Analyst; Taher Zeglum, PCA Data Engineer (MDA); Drew Pappas, PCA Project Manager (MDA); John Burken, PCA Control Engineer.

  2. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    Science.gov (United States)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  3. Exploring the dynamics of formal and informal networks in complex multi-team development projects

    DEFF Research Database (Denmark)

    Kratzer, J.; Gemuenden, H. G.; Lettl, Christopher

    2007-01-01

    The increasing number of complex multi-team projects and the scarcity of knowledge about how to run them successfully, create a need for systematic empirical studies. We attempt to lessen this empirical gap by examining the overlap and structure of formally ascribed design interfaces and informal...... communication networks between participating teams in two complex multi-team projects in the space industry. We study the two projects longitudinally throughout the design and integration phases of product development. There are three major findings. First, formally ascribed design interfaces and informal...... communication networks overlap only marginally. Second, the structure of informal communication remains largely stable in the transition from the design to the integration phase. The third and most intriguing finding is that the weak overlap between formally ascribed design interfaces and the informal...

  4. Action-Centered Team Leadership Influences More than Performance

    DEFF Research Database (Denmark)

    Braun, Frank C.; Avital, Michel; Martz, Ben

    2012-01-01

    Purpose – Building on a social-technical approach to project management, the authors aim to examine the effect of action-centered leadership attributes on team member's learning, knowledge collaboration and job satisfaction during IT-related projects. Design/methodology/approach – Structural...... collaboration along with individual performance and job satisfaction, and ultimately project success. Research limitations/implications – The action-centered leadership practices construct, developed in this study, can be a good surrogate measure of what is required to be an effective leader in an IT project...... equation modeling was utilized to assess the work environment of team members as well as the leadership practices of their respective project team leaders. Data were collected with a survey questionnaire from 327 team members in a variety of organizations in 15 industry sectors including financial services...

  5. Doing Interdisciplinary Mixed Methods Health Care Research: Working the Boundaries, Tensions, and Synergistic Potential of Team-Based Research.

    Science.gov (United States)

    Hesse-Biber, Sharlene

    2016-04-01

    Current trends in health care research point to a shift from disciplinary models to interdisciplinary team-based mixed methods inquiry designs. This keynote address discusses the problems and prospects of creating vibrant mixed methods health care interdisciplinary research teams that can harness their potential synergy that holds the promise of addressing complex health care issues. We examine the range of factors and issues these types of research teams need to consider to facilitate efficient interdisciplinary mixed methods team-based research. It is argued that concepts such as disciplinary comfort zones, a lack of attention to team dynamics, and low levels of reflexivity among interdisciplinary team members can inhibit the effectiveness of a research team. This keynote suggests a set of effective strategies to address the issues that emanate from the new field of research inquiry known as team science as well as lessons learned from tapping into research on organizational dynamics. © The Author(s) 2016.

  6. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  7. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Directory of Open Access Journals (Sweden)

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  8. The Creation and Operation of Internal High Performance Modern Enterprises Team

    Institute of Scientific and Technical Information of China (English)

    Shengyu WANG

    2015-01-01

    The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.

  9. Research project on “A Study in Urban Air Pollution Improvement in Asia”

    OpenAIRE

    2017-01-01

    This final report of the joint research project “A study in urban air pollution improvement in Asia” is submitted by the Asian Institute of Technology (AIT) on behalf of the project team following the contract between AIT and the Japan International Cooperation Agency (JICA) for the project period of March 2015 - December 2017. Technical support is provided by the Asia Center for Air Pollution Research (ACAP) Japan and the operational support is provided by the Pollution Control Department (P...

  10. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    Science.gov (United States)

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  11. Cancer Center Clinic and Research Team Perceptions of Identity and Interactions.

    Science.gov (United States)

    Reimer, Torsten; Lee, Simon J Craddock; Garcia, Sandra; Gill, Mary; Duncan, Tobi; Williams, Erin L; Gerber, David E

    2017-12-01

    Conduct of cancer clinical trials requires coordination and cooperation among research and clinic teams. Diffusion of and confusion about responsibility may occur if team members' perceptions of roles and objectives do not align. These factors are critical to the success of cancer centers but are poorly studied. We developed a survey adapting components of the Adapted Team Climate Inventory, Measure of Team Identification, and Measure of In-Group Bias. Surveys were administered to research and clinic staff at a National Cancer Institute-designated comprehensive cancer center. Data were analyzed using descriptive statistics, t tests, and analyses of variance. Responses were received from 105 staff (clinic, n = 55; research, n = 50; 61% response rate). Compared with clinic staff, research staff identified more strongly with their own group ( P teams, we also identified key differences, including perceptions of goal clarity and sharing, understanding and alignment with cancer center goals, and importance of outcomes. Future studies should examine how variation in perceptions and group dynamics between clinic and research teams may impact function and processes of cancer care.

  12. Assessing the impact on intercultural competencies when engineering students solve problems in multicultural teams

    DEFF Research Database (Denmark)

    Jensen, Lars Peter; Nygaard, Bjørn; Madsen, Linda

    2011-01-01

    solving problems in teams two times a year in all of their bachelor education. In at least four of the engineering education institutes in Denmark experiments on helping mixed student teams to perform better in their project work have been carried out for some years using a classic engineering trial......’ intercultural competencies. It was decided to start a formal research project to investigate some of the existing experiments helping mixed teams to cope with project work in intercultural teams. During spring 2010 the setup for the research project was developed by a group of representatives from...... as exchange students or to take a full degree. Project organized Problem based Learning is used to a high extent at most of the engineering educations in Denmark, using large scale project work (up to 15 ECTS each semester) solved in teams (3-7 students in each team). In more and more situations the teams...

  13. CO-OP JIGSAW TEAM PROJECTS: A COOPERATIVE TEACHING METHOD TO IMPROVE STUDENTS‘ SPEAKING SKILL (An Experimental Study in a Senior High School

    Directory of Open Access Journals (Sweden)

    Diaz Innova Citra Arum

    2017-12-01

    Full Text Available An effective speaking activity involves active students to participate and create a life communication. The ideal condition of English speaking class involves the students‘ effectiveness in participating teaching and learning process. Nevertheless, some problems are emerged and one of them is that they often get nervous to speak in front of many people when they are asked to present their work to their friends. This paper reveals an experiment study in teaching speaking in a senior high school in Lamongan, East Java. It discusses about the effectiveness of cooperative teaching method known as coop jigsaw team projects in teaching speaking. All tenth grade students were used as the population and eighty students were taken as sample being divided into experimental group taught using coop jigsaw team projects and control group taught using direct instruction. Cluster random sampling was applied as the technique to determine sample. To obtain the data of students‘ speaking score, a speaking test was conducted. The score was the average score resulted by two independent examiners. The data were analysed through descriptive and inferential analysis using two-sample t-test. The research hypothesised that coop jigsaw will result a better English speaking score rather than direct instruction method. The research finding using 95% significance level shows that coop jigsaw team projects was more effective in teaching speaking compared to direct instruction for the tenth grade students because the activities in coop jigsaw team project pushed the students to be more active and cooperative in learning speaking.

  14. A Team Formation Framework for Managing Diversity in Multidisciplinary Engineering Project

    Directory of Open Access Journals (Sweden)

    Shawqi Mohammed Hossain

    2017-02-01

    Full Text Available Team formation is one of the essential elements in constructing effective teamwork of any team size that requires different skill sets. Diversity in team encourages students to challenge and compete with one another while searching for new ideas, which in turn can lead to a better team performance. In a well-functioning diverse teams, the students who performed poorly may gain benefit by observing how excellent students approach the assignments. They may also benefit by getting advice and assistance from the excellent students. Studies have shown that Malaysian university graduates lack of team skills. The purpose of this paper is to propose a framework for forming a diverse multidisciplinary team among engineering undergraduates based on selected criteria such as individual personality type, gender, and other relevant demographic information. The proposed framework can also be used to design an automated team-formation system based on the identified metrics. The purpose of the framework is to consolidate the existing team formation literature, and to develop and test interventions for maximizing individual member and team performance as a whole that makes an effective team. For this study, a multidisciplinary approach was used where first year engineering students from three different faculties, namely Faculty of Electrical Engineering (FKE, Faculty of Mechanical Engineering (FKM, and Faculty of Biosciences and Medical Engineering (FBME at Universiti Teknologi Malaysia (UTM worked on an innovation project using the Conceive, Design, Implement, and Operate (CDIO framework. Keirsey Temperament Sorter was used as an instrument to identify an individual's personality type.

  15. Research project management 101: insiders' tips from Early Career Scientists

    Science.gov (United States)

    Cristini, Luisa; Pabortsava, Katsiaryna; Stichel, Torben

    2016-04-01

    From the very beginning of their career, it is important for Early Career Scientists (ECS) to develop project management skills to be able to organise their research efficiently. ECS are often in charge of specific tasks within their projects or for their teams. However, without specific training or tools, the successful completion of these assignments will depend entirely on the organisational skills of individual researchers. ECS are thus facing "sink-or-swim" situations, which can be either instructive or disastrous for their projects. Here we provide experience-based tips from fellow ECS that can help manage various project activities, including: 1. Communication with supervisors and peers 2. Lab management 3. Field trips (e.g., oceanographic campaigns) 4. Internships and collaborations with other institutions 5. Literature/background research 6. Conference convening These are potential "life buoys" for ECS, which will help them to carry out these tasks efficiently and successfully.

  16. Team situation awareness in nuclear power plant process control: A literature review, task analysis and future research

    International Nuclear Information System (INIS)

    Ma, R.; Kaber, D. B.; Jones, J. M.; Starkey, R. L.

    2006-01-01

    Operator achievement and maintenance of situation awareness (SA) in nuclear power plant (NPP) process control has emerged as an important concept in defining effective relationships between humans and automation in this complex system. A literature review on factors influencing SA revealed several variables to be important to team SA, including the overall task and team goals, individual tasks, team member roles, and the team members themselves. Team SA can also be adversely affected by a range of factors, including stress, mental over- or under-loading, system design (including human-machine interface design), complexity, human error in perception, and automation. Our research focused on the analysis of 'shared' SA and team SA among an assumed three-person, main-control-room team. Shared SA requirements represent the knowledge that is held in common by NPP operators, and team SA represents the collective, unique knowledge of all operators. The paper describes an approach to goal-directed task analysis (GDTA) applied to NPP main control room operations. In general, the GDTA method reveals critical operator decision and information requirements. It identifies operator SA requirements relevant to performing complex systems control. The GDTA can reveal requirements at various levels of cognitive processing, including perception, comprehension and projection, in NPP process control. Based on the literature review and GDTA approach, a number of potential research issues are proposed with an aim toward understanding and facilitating team SA in NPP process control. (authors)

  17. CERN's IT Consultancy Team: a new IT project support service

    CERN Multimedia

    Ignacio Reguero, IT Department

    2016-01-01

    Newly created IT Consultancy Team provides advice on IT matters to communities at CERN starting new projects or reviewing computing activities of old.   The members of CERN's IT Consultancy Team. The consultants share their knowledge and experience to improve awareness of the IT landscape at CERN and to advise on system architecture and design to ensure best usage of existing IT services and solutions that favour, and are compatible with, the infrastructure already in place. They also help to formalise requirements and assess impact on security, software licenses and cost, especially where contacts among different services are needed and questions go beyond the current computing service offerings. For instance, the IT consultants may help answering questions like the ones below: We are starting with project X – how could we make its computing aspects compatible with the CERN IT infrastructure? E.g. if you need a web content management system favour Drupal instead of Wor...

  18. Team building: electronic management-clinical translational research (eM-CTR) systems.

    Science.gov (United States)

    Cecchetti, Alfred A; Parmanto, Bambang; Vecchio, Marcella L; Ahmad, Sjarif; Buch, Shama; Zgheib, Nathalie K; Groark, Stephen J; Vemuganti, Anupama; Romkes, Marjorie; Sciurba, Frank; Donahoe, Michael P; Branch, Robert A

    2009-12-01

    Classical drug exposure: response studies in clinical pharmacology represent the quintessential prototype for Bench to Bedside-Clinical Translational Research. A fundamental premise of this approach is for a multidisciplinary team of researchers to design and execute complex, in-depth mechanistic studies conducted in relatively small groups of subjects. The infrastructure support for this genre of clinical research is not well-handled by scaling down of infrastructure used for large Phase III clinical trials. We describe a novel, integrated strategy, whose focus is to support and manage a study using an Information Hub, Communication Hub, and Data Hub design. This design is illustrated by an application to a series of varied projects sponsored by Special Clinical Centers of Research in chronic obstructive pulmonary disease at the University of Pittsburgh. In contrast to classical informatics support, it is readily scalable to large studies. Our experience suggests the culture consequences of research group self-empowerment is not only economically efficient but transformative to the research process.

  19. Project Leader's Dual Socialization and Its Impact on Team Learning and Performance: A Diagnostic Study

    Science.gov (United States)

    Gautam, Tanvi

    2009-01-01

    One of the important challenges for leadership in project teams is the ability to manage the knowledge, communication and coordination related activities of team. In cross-team collaboration, different boundaries contribute to the situated nature of knowledge and hamper the flow of knowledge and prevent shared understanding with those on the other…

  20. Balancing creativity and time efficiency in multi-team R&D projects: The alignment of formal and informal networks

    DEFF Research Database (Denmark)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    and their effect on the challenge to balance project creativity and time efficiency. In order to analyse this issue data in two multi-team R&D projects in space industry are collected. There are two intriguing findings that are partly contradicting the state-of-the art knowledge. First, formally ascribed design...... with the team's creativity, whereas it negatively impacts the team's time efficiency....

  1. Group Development and Integration in a Cross-Disciplinary and Intercultural Research Team

    Science.gov (United States)

    Kirk-Lawlor, Naomi; Allred, Shorna

    2017-04-01

    Cross-disciplinary research is necessary to solve many complex problems that affect society today, including problems involving linked social and environmental systems. Examples include natural resource management or scarcity problems, problematic effects of climate change, and environmental pollution issues. Intercultural research teams are needed to address many complex environmental matters as they often cross geographic and political boundaries, and involve people of different countries and cultures. It follows that disciplinarily and culturally diverse research teams have been organized to investigate and address environmental issues. This case study investigates a team composed of both monolingual and bilingual Chilean and US university researchers who are geoscientists, engineers and economists. The objective of this research team was to study both the natural and human parts of a hydrologic system in a hyper-arid region in northern Chile. Interviews ( n = 8) addressed research questions focusing on the interaction of cross-disciplinary diversity and cultural diversity during group integration and development within the team. The case study revealed that the group struggled more with cross-disciplinary challenges than with intercultural ones. Particularly challenging ones were instances the of disciplinary crosstalk, or hidden misunderstandings, where team members thought they understood their cross-disciplinary colleagues, when in reality they did not. Results showed that translation served as a facilitator to cross-disciplinary integration of the research team. The use of translation in group meetings as a strategy for effective cross-disciplinary integration can be extended to monolingual cross-disciplinary teams as well.

  2. Group Development and Integration in a Cross-Disciplinary and Intercultural Research Team.

    Science.gov (United States)

    Kirk-Lawlor, Naomi; Allred, Shorna

    2017-04-01

    Cross-disciplinary research is necessary to solve many complex problems that affect society today, including problems involving linked social and environmental systems. Examples include natural resource management or scarcity problems, problematic effects of climate change, and environmental pollution issues. Intercultural research teams are needed to address many complex environmental matters as they often cross geographic and political boundaries, and involve people of different countries and cultures. It follows that disciplinarily and culturally diverse research teams have been organized to investigate and address environmental issues. This case study investigates a team composed of both monolingual and bilingual Chilean and US university researchers who are geoscientists, engineers and economists. The objective of this research team was to study both the natural and human parts of a hydrologic system in a hyper-arid region in northern Chile. Interviews (n = 8) addressed research questions focusing on the interaction of cross-disciplinary diversity and cultural diversity during group integration and development within the team. The case study revealed that the group struggled more with cross-disciplinary challenges than with intercultural ones. Particularly challenging ones were instances the of disciplinary crosstalk, or hidden misunderstandings, where team members thought they understood their cross-disciplinary colleagues, when in reality they did not. Results showed that translation served as a facilitator to cross-disciplinary integration of the research team. The use of translation in group meetings as a strategy for effective cross-disciplinary integration can be extended to monolingual cross-disciplinary teams as well.

  3. Volunteer Team Management

    OpenAIRE

    Monych, Maria

    2015-01-01

    This thesis looked into volunteer team management in a project in AIESEC in Finland through the action research method. AIESEC in Finland is a non-profit non-government organization with a purpose of “peace and fulfilment of humankinds potential” through development of the youth’s future leadership. AIESEC was not a commissioning party; the project was the basis for the thesis without the supervision of the company. The thesis is based on a project that the author was in charge of, in ...

  4. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  5. Technology Applications Team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    Highlights of the Research Triangle Institute (RTI) Applications Team activities over the past quarter are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. The authors gratefully acknowledge the contributions of many individuals to the RTI Technology Applications Team program. The time and effort contributed by managers, engineers, and scientists throughout NASA were essential to program success. Most important to the program has been a productive working relationship with the NASA Field Center Technology Utilization (TU) Offices. The RTI Team continues to strive for improved effectiveness as a resource to these offices. Industry managers, technical staff, medical researchers, and clinicians have been cooperative and open in their participation. The RTI Team looks forward to continuing expansion of its interaction with U.S. industry to facilitate the transfer of aerospace technology to the private sector.

  6. The big five personality traits and individual satisfaction with the team

    NARCIS (Netherlands)

    Peeters, Miranda A.G.; Rutte, Christel G.; van Tuijl, Harrie F.J.M.; Reymen, Isabelle

    2006-01-01

    Relationships between team composition in terms of team members' Big Five personality traits and individual satisfaction with the team after project completion were researched. Questionnaires were filled out by 310 undergraduate students (N= 68 teams) working on an engineering design assignment.

  7. Factors associated with continuance commitment to FAA matrix teams.

    Science.gov (United States)

    1993-11-01

    Several organizations within the FAA employ matrix teams to achieve cross-functional coordination. Matrix team members typically represent different organizational functions required for project accomplishment (e.g., research and development, enginee...

  8. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  9. SpaceScience@Home: Authentic Research Projects that Use Citizen Scientists

    Science.gov (United States)

    Méndez, B. J. H.

    2008-06-01

    In recent years, several space science research projects have enlisted the help of large numbers of non-professional volunteers, ``citizen scientists'', to aid in performing tasks that are critical to a project, but require more person-time (or computing time) than a small professional research team can practically perform themselves. Examples of such projects include SETI@home, which uses time from volunteers computers to process radio-telescope observation looking for signals originating from extra-terrestrial intelligences; Clickworkers, which asks volunteers to review images of the surface of Mars to identify craters; Spacewatch, which used volunteers to review astronomical telescopic images of the sky to identify streaks made by possible Near Earth Asteroids; and Stardust@home, which asks volunteers to review ``focus movies'' taken of the Stardust interstellar dust aerogel collector to search for possible impacts from interstellar dust particles. We shall describe these and other similar projects and discuss lessons learned from carrying out such projects, including the educational opportunities they create.

  10. Design, Evaluation and Validation, and Analysis of a Five-Dimensional Leadership Questionnaire for a Project Leader in an International Scientific Research Environment

    CERN Document Server

    Wilfinger, Roman

    2008-01-01

    The basic goal of the study is to develop a five dimensional leadership questionnaire for a project leader in an international scientific research laboratory and to verify statistically the independency of the individual questions from each other to ensure low overlap in content and meaning by achieving low correlation coefficients. This leadership questionnaire is designed to examine the behavior, personality, and character attributes of a project or experiment team leader in an international scientific research laboratory as perceived by her/his team members during the planning, design, implementation, and execution of the project itself. The leadership questionnaire is applied to a sample of about 40 participants from different international scientific research laboratories. This sample should represent in age, rank, and profession the whole population of employees and team members currently working in different international scientific research laboratories dealing with physics, informatics, and engineeri...

  11. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  12. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  13. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  14. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  15. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    OpenAIRE

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  16. Effects of Individual Success on Globally Distributed Team Performance

    OpenAIRE

    Yılmaz, Onur

    2013-01-01

    Necessity of different competencies with high level of knowledge makes it inevitable that software development is a team work. With the today's technology, teams can communicate both synchronously and asynchronously using different online collaboration tools throughout the world. Researches indicate that there are many factors that affect the team success and in this paper, effect of individual success on globally distributed team performance will be analyzed. Student team projects undertaken...

  17. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  18. Complex approach in telecommunication engineering education: develop engineering skills by a team project

    Directory of Open Access Journals (Sweden)

    Scripcariu Luminița

    2017-01-01

    Full Text Available This paper provides an overview of the educational process of telecommunication engineering students by presenting the preparation of a team project focused on information security. Our educational approach combines basic knowledge such as mathematics with specialized engineering notions and various skills. The project theme is to design, implement and test an encryption algorithm. Students are provided with online courses, specific software programs and Internet access. They have to choose an encryption algorithm, to study its details and to write the script of the encryption algorithm in MATLAB program. The algorithm is implemented in C/C++ programming language and tested. Finally, a concurrent team tries to break the algorithm by finding the decryption key. It is an interactive approach which combines various education methods including gaming concepts. The covered topics provide students professional outcomes such as knowledge and use of specific mathematical tools and software environments (C/C ++ programming languages, MATLAB, abilities to design, develop, implement and test software algorithms. The project also provides transversal outcomes such as ability to team work, skills of computer use and information technology and capability to take responsibilities. Creativity is also encouraged by extending the algorithm to other encryption key lengths than the usual ones.

  19. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  20. The neutron utilization and promotion program of TRR-II research reactor project in Taiwan

    International Nuclear Information System (INIS)

    Gone, J.K.; Huang, Y.H.

    2001-01-01

    The objective of the Taiwan research reactor system improvement and utilization promotion project is to reconstruct the old Taiwan research reactor (TRR), which was operated by the Institute of Nuclear Energy Research (INER) between 1973 and 1988, into a multi-purpose medium flux research reactor (TRR-II). The project started in 1998, and the new reactor is scheduled to have its first critical in June of 2006. The estimated maximum unperturbed thermal neutron flux (E 14 n/cm 2 sec, and it is about one order of magnitude higher than other operating research reactors in Taiwan. The new reactor will equip with secondary neutron sources to provide neutrons with different energies, which will be an essential tool for advanced material researches in Taiwan. One of the major tasks of TRR-II project is to promote domestic utilization of neutrons generated at TRR-II. The traditional uses of neutrons in fuel/material research, trace element analysis, and isotope production has been carried out at INER for many years. On the other hand, it is obvious that promotions of neutron spectrometric technique will be a major challenge for the project team. The limited neutron flux from operating research reactors had discouraged domestic users in developing neutron spectrometric technique for many years, and only few researchers in Taiwan are experienced in using spectrometers. It is important for the project team to encourage domestic researchers to use neutron spectrometers provided by TRR-II as a tool for their future researches in various fields. This paper describes the current status of TRR-II neutron utilization and promotion program. The current status and future plans for important issues such as staff recruiting, personnel training, international collaboration, and promotion strategy will be described. (orig.)

  1. TEAM 1 Integrated Research Partnerships for Malaria Control ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    IDRC CRDI

    TEAM 1 Integrated Research Partnerships for Malaria Control through an Ecohealth Approach in. East Africa. Abstract: Representing East Africa, the National Institute for Medical Research (NIMR, Tanzania), icipe, the. Kigali Health Institute (Rwanda) and the Kamuli local government district authority in Uganda form.

  2. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  3. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  4. Initial evaluation of the effects of an environmental-focused problem-solving intervention for transition-age young people with developmental disabilities: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica M; Helfrich, Christine; Levin, Melissa; Hwang, I-Ting; Samuel, Preethy S; Carrellas, Ann; Schwartz, Ariel E; Goeva, Aleksandrina; Kolaczyk, Eric D

    2018-03-12

    Project TEAM (Teens making Environment and Activity Modifications) teaches transition-age young people with developmental disabilities, including those with co-occurring intellectual or cognitive disabilities, to identify and resolve environmental barriers to participation. We examined its effects on young people's attainment of participation goals, knowledge, problem-solving, self-determination, and self-efficacy. We used a quasi-experimental, repeated measures design (initial, outcome, 6-week follow-up) with two groups: (1) Project TEAM (28 males, 19 females; mean age 17y 6mo); and (2) goal-setting comparison (21 males, 14 females; mean age 17y 6mo). A matched convenience sample was recruited in two US states. Attainment of participation goals and goal attainment scaling (GAS) T scores were compared at outcome. Differences between groups for all other outcomes were analyzed using linear mixed effects models. At outcome, Project TEAM participants demonstrated greater knowledge (estimated mean difference: 1.82; confidence interval [CI]: 0.90, 2.74) and ability to apply knowledge during participation (GAS: t[75]=4.21; CI: 5.21, 14.57) compared to goal-setting. While both groups achieved significant improvements in knowledge, problem-solving, and self-determination, increases in parent reported self-determination remained at 6-week follow-up only for Project TEAM (estimated mean difference: 4.65; CI: 1.32, 7.98). Significantly more Project TEAM participants attained their participation goals by follow-up (Project TEAM=97.6%, goal-setting=77.1%, p=0.009). Both approaches support attainment of participation goals. Although inconclusive, Project TEAM may uniquely support young people with developmental disabilities to act in a self-determined manner and apply an environmental problem-solving approach over time. Individualized goal-setting, alone or during Project TEAM (Teens making Environment and Activity Modifications) appears to support attainment of participation

  5. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  6. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  7. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  8. Accelerators: Sparking Innovation and Transdisciplinary Team Science in Disparities Research

    Science.gov (United States)

    Horowitz, Carol R.; Shameer, Khader; Gabrilove, Janice; Atreja, Ashish; Shepard, Peggy; Goytia, Crispin N.; Smith, Geoffrey W.; Dudley, Joel; Manning, Rachel; Bickell, Nina A.; Galvez, Maida P.

    2017-01-01

    Development and implementation of effective, sustainable, and scalable interventions that advance equity could be propelled by innovative and inclusive partnerships. Readied catalytic frameworks that foster communication, collaboration, a shared vision, and transformative translational research across scientific and non-scientific divides are needed to foster rapid generation of novel solutions to address and ultimately eliminate disparities. To achieve this, we transformed and expanded a community-academic board into a translational science board with members from public, academic and private sectors. Rooted in team science, diverse board experts formed topic-specific “accelerators”, tasked with collaborating to rapidly generate new ideas, questions, approaches, and projects comprising patients, advocates, clinicians, researchers, funders, public health and industry leaders. We began with four accelerators—digital health, big data, genomics and environmental health—and were rapidly able to respond to funding opportunities, transform new ideas into clinical and community programs, generate new, accessible, actionable data, and more efficiently and effectively conduct research. This innovative model has the power to maximize research quality and efficiency, improve patient care and engagement, optimize data democratization and dissemination among target populations, contribute to policy, and lead to systems changes needed to address the root causes of disparities. PMID:28241508

  9. Longitudinal observations of globally distributed design teams: The impacts on Product Development

    DEFF Research Database (Denmark)

    Taylor, Thomas Paul; Ahmed-Kristensen, Saeema

    2015-01-01

    Factors impacting the success of Product Development (PD) projects are intensified when teams are distributed globally, making it a challenging task for project management to deal with effects on time, cost and quality. It is important for project management to understand when challenges......, such as communication difficulties, a lack of common vision between team members or issues related to documentation, may occur during PD projects, enabling them to take the necessary preventative action (Edmondson and Nembhard, 2009). When investigating factors impacting the success of PD, the majority of research...... studies of globally distributed design teams in PD projects. This paper aims to contribute to the further understanding of the factors impacting the success of PD projects when teams are distributed globally. With the results from a longitudinal observational study over 8 months, the factors impacting...

  10. NASA technology applications team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.

  11. Shared Leadership Improves Team Novelty: The Mechanism and Its Boundary Condition

    Science.gov (United States)

    Sun, Xiaomin; Jie, Yuan; Wang, Yilu; Xue, Gang; Liu, Yan

    2016-01-01

    Previous research has revealed the significant impact of shared leadership on team creativity, yet the mechanism underlying this relationship has rarely been investigated. The current research examined how shared leadership influenced team creativity (novelty and usefulness) across 3 studies using both long-term project teams and temporal task teams in the laboratory. The results showed that shared leadership enhanced the novelty dimension of team creativity by improving constructive controversy. Furthermore, team goal orientation moderated this effect. The indirect effect of constructive controversy holds for teams with learning goal orientation but not for those with performance goal orientation. Such patterns were not found in the usefulness dimension of team creativity. PMID:28066289

  12. The link class project : Collaborative virtual teams between Peru and The Netherlands

    NARCIS (Netherlands)

    Olivos Rossini, L.M.; Rincon, Sandra; Rutkowski, Anne-Francoise

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the

  13. Six world-class research teams to investigate overcoming ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Six world-class research teams to investigate overcoming therapeutic resistance in high fatality cancers. 26 octobre 2017. Together with our partners the Canadian Institutes of Health Research, the Azrieli Foundation and the Israel Science Foundation we are pleased to announce the recipients of the Joint Canada-Israel ...

  14. Fair ranking of researchers and research teams.

    Science.gov (United States)

    Vavryčuk, Václav

    2018-01-01

    The main drawback of ranking of researchers by the number of papers, citations or by the Hirsch index is ignoring the problem of distributing authorship among authors in multi-author publications. So far, the single-author or multi-author publications contribute to the publication record of a researcher equally. This full counting scheme is apparently unfair and causes unjust disproportions, in particular, if ranked researchers have distinctly different collaboration profiles. These disproportions are removed by less common fractional or authorship-weighted counting schemes, which can distribute the authorship credit more properly and suppress a tendency to unjustified inflation of co-authors. The urgent need of widely adopting a fair ranking scheme in practise is exemplified by analysing citation profiles of several highly-cited astronomers and astrophysicists. While the full counting scheme often leads to completely incorrect and misleading ranking, the fractional or authorship-weighted schemes are more accurate and applicable to ranking of researchers as well as research teams. In addition, they suppress differences in ranking among scientific disciplines. These more appropriate schemes should urgently be adopted by scientific publication databases as the Web of Science (Thomson Reuters) or the Scopus (Elsevier).

  15. Research-retreat-recovery: A potential model for organization and completion of research projects. Experience from a neurosurgery department in a developing country.

    Science.gov (United States)

    Godil, Saniya Siraj; Kazim, Syed Faraz; Shamim, Muhammad Shahzad

    2010-10-30

    In the current era of biomedical research, it is imperative that every research study at an institution is properly organized, and frequently audited to streamline efforts and maintain standards. Recently, a research retreat was organized by the Section of Neurosurgery at Aga Khan University Hospital, Karachi, Pakistan, and following that a recovery team was made with the aim of recovering "lost in translation" research projects. In the realm of our experience, the current model is being proposed as a means for organization of departmental research. The "research" component of the model comprised compilation of an abstract book of all research work done within the section during the last five years. The "retreat" component of the model was intended with objectives of analysis of past research and generation of fresh ideas. The "recovery" component of the model was accomplished by formation of a research recovery team with the aim of recovering unfinished, and/or unpublished research projects. The abstract book comprised 103 abstracts: 52.4% original research studies, 12.6% review articles, and 34.9% case report/series. Only 8.7% abstracts were of basic science research whereas the remaining 91.3% were clinical research papers. Only 34% had been published in an article form in a biomedical research journal (51.4% in international journals and 48.6% in national journals); remaining papers were either in submission/preparation process or had been abandoned. As part of research recovery, 29.4% projects were recovered within 12 weeks of the retreat component. We conclude that the model of "research-retreat-recovery" is highly successful in the context of neurosurgery departments in developing countries without a proper research unit, and can result in better organization of departmental research, recovery of unfinished projects, and initiation of new research studies.

  16. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teaming concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.

  17. Paradoxes in virtual team knowledge communication and trust building

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    This thesis proposal presents paradoxes within current trust and knowledge management literatures as a lens for understanding challenges in virtual teams working across organisational and geographic boundaries. By exposing contradictions within current virtual team research, the author proposes...... a need for a different, multi-level, multi-theoretical approach to virtual team research in order to overcome the paradoxes. A moderate constructionist research position building on Critical Realism is proposed. To situate the project within current literatures, trust, knowledge management and virtual...... team literatures are reviewed. These are used to support the paradoxes used as a lens for understanding. A research design is presented building on interviews, documentary analysis and observations analysed using Social Network Analysis and James Gee’s framework for discourse analysis. Finally...

  18. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  19. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  20. Project team formation support for self-directed learners in social learning networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2012-01-01

    Spoelstra, H., Van Rosmalen, P., & Sloep, P. B. (2012). Project team formation support for self-directed learners in social learning networks. In P. Kommers, P. Isaias, & N. Bessis (Eds.), Proceedings of the IADIS International Conference on Web Based Communities and Social Media (ICWBC & SM 2012)

  1. Quality control and data-handling in multicentre studies: the case of the Multicentre Project for Tuberculosis Research

    Directory of Open Access Journals (Sweden)

    Caloto Teresa

    2001-12-01

    Full Text Available Abstract Background The Multicentre Project for Tuberculosis Research (MPTR was a clinical-epidemiological study on tuberculosis carried out in Spain from 1996 to 1998. In total, 96 centres scattered all over the country participated in the project, 19935 "possible cases" of tuberculosis were examined and 10053 finally included. Data-handling and quality control procedures implemented in the MPTR are described. Methods The study was divided in three phases: 1 preliminary phase, 2 field work 3 final phase. Quality control procedures during the three phases are described. Results: Preliminary phase: a organisation of the research team; b design of epidemiological tools; training of researchers. Field work: a data collection; b data computerisation; c data transmission; d data cleaning; e quality control audits; f confidentiality. Final phase: a final data cleaning; b final analysis. Conclusion The undertaking of a multicentre project implies the need to work with a heterogeneous research team and yet at the same time attain a common goal by following a homogeneous methodology. This demands an additional effort on quality control.

  2. Multicultural Ground Teams in Space Programs

    Science.gov (United States)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  3. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  4. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  5. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  6. Defining features of the practice of global health research: an examination of 14 global health research teams

    Directory of Open Access Journals (Sweden)

    Craig Stephen

    2010-07-01

    Full Text Available Objectives: This paper strives to develop a pragmatic view of the scope of practice and core characteristics of global health research (GHR by examining the activities of 14 Canadian-funded global health teams that were in the process of implementing research programs. Methods: Information was collected by a reflective exploration of team proposals and progress reports, a content analysis of the outputs from an all-team meeting and review of the literature. Results: Teams adopted equity-centered, problem-focused, systems-based approaches intended to find upstream determinants that could make people more resilient to social and ecological factors impacting their health. Long-term visions and time frames were needed to develop and solidify fully functional interdisciplinary, multinational, multicultural partnerships. The implementation of research into practice was a motivating factor for all teams, but to do this, they recognized the need for evidence-based advice on how to best do this. Traditional measures of biomedical research excellence were necessary but not sufficient to encompass views of excellence of team-based interdisciplinary research, which includes features like originality, coherence and cumulative contributions to fields of study, acceptance by peers and success in translating research into gains in health status. An innovative and nuanced approached to GHR ethics was needed to deal with some unique ethical issues because the needs for GHR were not adequately addressed by institutional biomedical research ethics boards. Core competencies for GHR researchers were a blend of those needed for health promotion, population health, international development, sustainable development, and systems science. Discussion: Developing acceptable and meaningful ways to evaluate the short-term contributions for GHR and forecast its long-term impacts is a strategic priority needed to defend decisions being made in GHR development. Planning and

  7. Intelligent Virtual Assistant's Impact on Technical Proficiency within Virtual Teams

    Science.gov (United States)

    Graham, Christian; Jones, Nory B.

    2016-01-01

    Information-systems development continues to be a difficult process, particularly for virtual teams that do not have the luxury of meeting face-to-face. The research literature on this topic reinforces this point: the greater part of database systems development projects ends in failure. The use of virtual teams to complete projects further…

  8. Budgeting, funding, and managing clinical research projects.

    Science.gov (United States)

    Hatfield, Elizabeth; Dicks, Elizabeth; Parfrey, Patrick

    2009-01-01

    Large, integrated multidisciplinary teams have become recognized as an efficient means by which to drive innovation and discovery in clinical research. This chapter describes how to budget and fund these large studies and effectively manage the large, often dispersed teams involved. Sources of funding are identified; budget development, justification, reporting, financial governance, and accountability are described; in addition to the creation and management of the multidisciplinary team that will implement the research plan.

  9. Accelerators: Sparking Innovation and Transdisciplinary Team Science in Disparities Research

    Directory of Open Access Journals (Sweden)

    Carol R. Horowitz

    2017-02-01

    Full Text Available Development and implementation of effective, sustainable, and scalable interventions that advance equity could be propelled by innovative and inclusive partnerships. Readied catalytic frameworks that foster communication, collaboration, a shared vision, and transformative translational research across scientific and non-scientific divides are needed to foster rapid generation of novel solutions to address and ultimately eliminate disparities. To achieve this, we transformed and expanded a community-academic board into a translational science board with members from public, academic and private sectors. Rooted in team science, diverse board experts formed topic-specific “accelerators”, tasked with collaborating to rapidly generate new ideas, questions, approaches, and projects comprising patients, advocates, clinicians, researchers, funders, public health and industry leaders. We began with four accelerators—digital health, big data, genomics and environmental health—and were rapidly able to respond to funding opportunities, transform new ideas into clinical and community programs, generate new, accessible, actionable data, and more efficiently and effectively conduct research. This innovative model has the power to maximize research quality and efficiency, improve patient care and engagement, optimize data democratization and dissemination among target populations, contribute to policy, and lead to systems changes needed to address the root causes of disparities.

  10. SecurityCom: A Multi-Player Game for Researching and Teaching Information Security Teams

    Directory of Open Access Journals (Sweden)

    Douglas P. Twitchell

    2007-12-01

    Full Text Available A major portion of government and business organizations’ attempts to counteract information security threats is teams of security personnel.  These teams often consist of personnel of diverse backgrounds in specific specialties such as network administration, application development, and business administration, resulting in possible conflicts between security, functionality, and availability.  This paper discusses the use of games to teach and research information security teams and outlines research to design and build a simple, team-oriented, configurable, information security game. It will be used to study how information security teams work together to defend against attacks using a multi-player game, and to study the use of games in training security teams.  Studying how information security teams work, especially considering the topic of shared-situational awareness, could lead to better ways of forming, managing, and training teams.  Studying the effectiveness of the game as a training tool could lead to better training for security teams. 

  11. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Directory of Open Access Journals (Sweden)

    Núria Rovira-Asenjo

    Full Text Available Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering. So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4-5 members. Each team was headed by either a female or male leader, so that 45 leaders (33% women supervised 258 team members (39% women. Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders' self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration. While we did not find any gender differences in leaders' self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders.

  12. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Science.gov (United States)

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  13. Effects of interdependencies in project teams

    NARCIS (Netherlands)

    Van der Vegt, G.S.; Emans, B.J.M.; Van de Vliert, E.

    The associations between task interdependence, outcome interdependence, and the effectiveness of team members were examined. The sample consisted of 181 employees at 10 engineering companies in The Netherlands. The participants evaluated their interdependence with 1 specific team member and rated

  14. The academic librarian as co-investigator on an interprofessional primary research team: a case study.

    Science.gov (United States)

    Janke, Robert; Rush, Kathy L

    2014-06-01

    The objective of this study was to explore the role librarians play on research teams. The experiences of a librarian and a faculty member are situated within the wider literature addressing collaborations between health science librarians and research faculty. A case study approach is used to outline the involvement of a librarian on a team created to investigate the best practices for integrating nurses into the workplace during their first year of practice. Librarians contribute to research teams including expertise in the entire process of knowledge development and dissemination including the ability to navigate issues related to copyright and open access policies of funding agencies. The librarian reviews the various tasks performed as part of the research team ranging from the grant application, to working on the initial literature review as well as the subsequent manuscripts that emerged from the primary research. The motivations for joining the research team, including authorship and relationship building, are also discussed. Recommendations are also made in terms of how librarians could increase their participation on research teams. The study shows that librarians can play a key role on interprofessional primary research teams. © 2014 The authors. Health Information and Libraries Journal © 2014 Health Libraries Group.

  15. Managing Astronomy Research Data: Case Studies of Big and Small Research Projects

    Science.gov (United States)

    Sands, Ashley E.

    2015-01-01

    Astronomy data management refers to all actions taken upon data over the course of the entire research process. It includes activities involving the collection, organization, analysis, release, storage, archiving, preservation, and curation of research data. Astronomers have cultivated data management tools, infrastructures, and local practices to ensure the use and future reuse of their data. However, new sky surveys will soon amass petabytes of data requiring new data management strategies.The goal of this dissertation, to be completed in 2015, is to identify and understand data management practices and the infrastructure and expertise required to support best practices. This will benefit the astronomy community in efforts toward an integrated scholarly communication framework.This dissertation employs qualitative, social science research methods (including interviews, observations, and document analysis) to conduct case studies of data management practices, covering the entire data lifecycle, amongst three populations: Sloan Digital Sky Survey (SDSS) collaboration team members; Individual and small-group users of SDSS data; and Large Synoptic Survey Telescope (LSST) collaboration team members. I have been observing the collection, release, and archiving of data by the SDSS collaboration, the data practices of individuals and small groups using SDSS data in journal articles, and the LSST collaboration's planning and building of infrastructure to produce data.Preliminary results demonstrate that current data management practices in astronomy are complex, situational, and heterogeneous. Astronomers often have different management repertoires for working on sky surveys and for their own data collections, varying their data practices as they move between projects. The multitude of practices complicates coordinated efforts to maintain data.While astronomy expertise proves critical to managing astronomy data in the short, medium, and long term, the larger astronomy

  16. Integration of Slack, a cloud-based team collaboration application, into research coordination.

    Science.gov (United States)

    Gofine, Miriam; Clark, Sunday

    2017-06-30

    Practitioners of epidemiology require efficient real-time communication and shared access to numerous documents in order to effectively manage a study. Much of this communication involves study logistics and does not require use of Protected Health Information. Slack is a team collaboration app; it archives all direct messages and group conversations, hosts documents internally, and integrates with the Google Docs application. Slack has both desktop and mobile applications, allowing users to communicate in real-time without the need to find email addresses or phone numbers or create contact lists. METHOD: We piloted the integration of Slack into our research team of one faculty member, one research coordinator, and approximately 20 research assistants. Statistics describing the app's usage were calculated twelve months after its implementation. RESULTS: Results indicating heavy usage by both research professionals and assistants are presented. Our Slack group included a cumulative 51 users. Between October 2015 and November 2016, approximately 10,600 messages were sent through Slack; 53% were sent by RA's and 47% were sent by us. Of the 106 files stored on Slack, 82% were uploaded by research staff. In a January 2016 survey, 100% of RA's agreed or strongly agreed that Slack improved communication within the team. CONCLUSION: We demonstrate a model for integration of communication technology into academic activities by research teams. Slack is easily integrated into the workflow at an urban, academic medical center and is adopted by users as a highly effective tool for meeting research teams' communication and document management needs.

  17. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  18. SFB754 - data management in large interdisciplinary collaborative research projects: what matters?

    Science.gov (United States)

    Mehrtens, Hela; Springer, Pina; Schirnick, Carsten; Schelten, Christiane K.

    2016-04-01

    Data management for SFB 754 is an integral part of the joint data management team at GEOMAR Helmholtz Centre for Ocean Research Kiel, a cooperation of the Cluster of Excellence "Future Ocean", the SFB 754 and other current and former nationally and EU-funded projects. The coalition successfully established one common data management infrastructure for marine sciences in Kiel. It aims to help researchers to better document the data lifecycle from acquisition to publication and share their results already during the project phase. The infrastructure is continuously improved by integration of standard tools and developing extensions in close cooperation with scientists, data centres and other research institutions. Open and frequent discussion of data management topics during SFB 754 meetings and seminars and efficient cooperation with its coordination office allowed gradual establishment of better data management practices. Furthermore a data policy was agreed on to ensure proper usage of data sets, even unpublished ones, schedules data upload and dissemination and enforces long-term public availability of the research outcome. Acceptance of the infrastructure is also backed by easy usage of the web-based platform for data set documentation and exchange among all research disciplines of the SFB 754. Members of the data management team act as data curators and assist in data publication in World Data Centres (e.g. PANGAEA). Cooperation with world data centres makes the research data then globally searchable and accessible while links to the data producers ensure citability and provide points of contact for the scientific community. A complete record of SFB 754 publications is maintained within the institutional repository for full text print publications by the GEOMAR library. This repository is strongly linked with the data management information system providing dynamic and up-to-date overviews on the various ties between publications and available data sets

  19. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  20. Leading teaming: Evidence from Jazz

    OpenAIRE

    Araújo, Francisco Maria Trigo da Roza Carvalho

    2013-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics In this research we conducted qualitative analysis to study the team dynamics of jazz combos in order to explore deeper the leadership behaviors in a creative environment where teaming occurs. We found evidence of a dual leader, one that shifts his/her role between ‘leader as leader’ and ‘leader as member’, embracing both leaderfulness an...

  1. Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams

    NARCIS (Netherlands)

    Rusman, Ellen; Van Bruggen, Jan; Sloep, Peter; Valcke, Martin; Koper, Rob

    2010-01-01

    Rusman, E., Van Bruggen, J., Sloep, P. B., Valcke, M., & Koper, R. (2012). Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams. International Journal of Information Technology Project Management (IJITPM), 3(1), 15-35.

  2. Learning from doing the EquitAble project: Content, context, process, and impact of a multi-country research project on vulnerable populations in Africa

    Directory of Open Access Journals (Sweden)

    Mac MacLachlan

    2014-10-01

    Objectives: This article reports on the content, context, process and impact of project EquitAble, funded by the European Commission Seventh Research Framework Programme, which brought together researchers from Ireland, Norway, South Africa, Namibia, Sudan and Malawi. Method: After the 4-year project ended in February 2013, all members of the consortium were asked to anonymously complete a bespoke questionnaire designed by the coordinating team. The purpose of the questionnaire was to capture the views of those who collaborated on the research project in relation to issues of content, context, process and impact of the EquitAble project. Results: Our results indicated some of the successes and challenges encountered by our consortium. Conclusion: We identified contextual and process learning points, factors often not discussed in papers, which typically focus on the reporting of the ‘content’ of results.

  3. Interprofessional Education and Team-Based Learning in a Research Methods Course.

    Science.gov (United States)

    Schug, Vicki; Finch-Guthrie, Patricia; Benz, Janet

    2017-12-18

    This article describes team-based pedagogical strategies for a hybrid, four-credit research methods course with students from nursing, exercise, and nutrition science. The research problem of concussion in football, a socially relevant and controversial topic, was used to explore interprofessional perspectives and develop shared problem solving. The course was designed using permanent teams, readiness assurance, application exercises, and peer evaluation to facilitate student achievement of competencies related to interprofessional collaboration and research application. Feedback from students, faculty, and the Readiness for Interprofessional Learning Scale was used to evaluate the learning innovation.

  4. Working with teams of "insiders": Qualitative approaches to data collection in the Global South

    Directory of Open Access Journals (Sweden)

    Enid Schatz

    2015-02-01

    Full Text Available Background: The convergence of two qualitative methodological strategies - working in "teams" and with "insiders" - can facilitate access, efficiency, and insights into research questions of interest to demographers. Even though this approach is becoming more common among population researchers in the Global South to address a range of research questions, little has been published that describes the method and critically assesses its strengths and weaknesses. Objective: We draw on three projects embedded in the Agincourt Health and Socio-Demographic Surveillance System site in rural South Africa that integrate both approaches to demonstrate the benefits and limitations of this strategy. Methods: We document, through in-depth description, how these three projects achieve access, efficiency, and insights into issues of population concern (HIV/AIDS, aging, and child wellbeing utilizing a "team-insider" approach by working with groups of local research assistants. Conclusions: The projects vary in their use of "teams" and "insiders" but collectively deepen our understanding of pressing population concerns in the Global South. In particular, by using teams of insiders, these projects gain insights into local ideas about HIV, uncover ways that HIV affects older women's lives, and provide in-depth understanding of children's social connections. The approach also presents a number of challenges, however, such as grappling with the responsibilities and burdens that are placed on local insider team members.

  5. Research and development portfolio of the sustainability science team national sustainable operations USDA Forest Service

    Science.gov (United States)

    Trista Patterson; David Nicholls; Jonathan Long

    2015-01-01

    The Sustainability Science Team (SST) of the U.S. Department of Agriculture (USDA) Forest Service Sustainable Operations Initiative is a 18-member virtual research and development team, located across five regions and four research stations of the USDA Forest Service. The team provides research, publication, systems analysis, and decision support to the Sustainable...

  6. ORGANIZATIONAL STRUCTURE OF RESEARCH PROJECT ACTIVITIES PERFORMED AT MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: There are five Bulgarian medical universities in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. A major priority of medical universities is to encourage research activities mainly aimed at preparation and implementation of research projects. Projects are managed by the participating organizations called “beneficiaries”. Beneficiaries develop projects, apply for finances and if approved they implement those projects.Aim: The purpose of our study is to examine the organizational structure of research project activities on the macro level and on the micro level in Bulgarian medical universities.Material and methods: In order to define the separate elements of the organizational structure and to analyze the relations and interaction between them we have applied a documentary and sociological approach. Results: During the last six years there was a significant increase in the number and the overall annual financial value of the projects performed at medical universities in Bulgaria. The reasons for such increase are: managers realizing the advantages of and benefits from the implementation of research projects ensuring high quality modernization of research units’ equipment and facilities; access to innovative technologies; development of interdisciplinary relations, etc. Benefits arising from improved results motivate us to consider as appropriate some additional investments aimed at increasing the number of team members and further optimization of the currently existing structures (research centers in charge of research with the purpose of achieving even better results in this particular field. Conclusion: The role of research project activities in medical universities’ research field is of vital importance for the educational institutions’ success. Taking into consideration the changed conditions, European possibilities and the highly competitive environment, realizing this aspect will be essential for the

  7. Beautiful Teams Inspiring and Cautionary Tales from Veteran Team Leaders

    CERN Document Server

    Stellman, Andrew

    2009-01-01

    What's it like to work on a great software development team facing an impossible problem? How do you build an effective team? Beautiful Teams takes you behind the scenes with some of the most interesting teams in software engineering history. You'll learn from veteran team leaders' successes and failures, told through a series of engaging personal stories -- and interviews -- by leading programmers, architects, project managers, and thought leaders.

  8. THESEUS - a research project to improve the safety standard of tank vehicles for dangerous goods

    International Nuclear Information System (INIS)

    Guenther, B.

    1992-01-01

    A research project reffered to as THESEUS was initiated by the Federal Ministry of Research and Technology of Germany. The intent of the investigation is to generate measures designed to enhance the safety standard of commercial transports of dangerous goods in tank vehicles. Hereby, the analysis of real accidents by teams within the project will provide the relevant parameters for the experimental and theoretical investigation of vehicles, tank components and safety devices. The project started in summer 1990. This paper will focus main features and the work done so far. Special consideration will be made to the failure behaviour of tank components as the authors field of activity. (orig.)

  9. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  10. The Benefits of Peer-Mentoring in Undergraduate Group Research Projects at The University of Arizona

    Science.gov (United States)

    Hardegree-Ullman, Kevin; McGraw, A. M.; Towner, A. P.; Walker-LaFollette, A.; Robertson, A.; Smith, C.; Turner, J.; Biddle, L. I.; Thompson, R.

    2013-06-01

    According to the American Institute of Physics, the number of graduate students enrolled in astronomy programs in the US has been steadily increasing in the past 15 years. Research experience is one of the key factors graduate admissions committees look for when choosing students. The University of Arizona Astronomy Club is setting a new precedent in research by having students introduce other students to research. This eases the transition to research projects, and allows students to work in a comfortable setting without the sometimes-overwhelming cognitive disconnect between a professor and their students. The University of Arizona's research projects have many benefits to all students involved. It is well established that people learn a subject best when they have to teach it to others. Students leading the projects learn alongside their peers in a peer-mentoring setting. When project leaders move on in their academic career, other project members can easily take the lead. Students learn how to work in teams, practice effective communication skills, and begin the processes of conducting a full research project, which are essential skills for all budding scientists. These research projects also give students hands-on research experience that supplement and greatly expand on concepts taught in the classroom, and make them more attractive to graduate schools and REU programs.

  11. One step ahead of technology Cern and HP - an ideal team project

    CERN Multimedia

    Garvey, Kelsey

    2009-01-01

    "In 2004, the It team at Cern recognized the comprehensiveness and future of the LHC Computing Grid Project and realized that the IT infrastructures were not sufficient enough to manage the data. Cern therefore partnered with HP ProCurve the following year to minimize the day-to-day workload and improve infrastructure for data output" (1 page)

  12. Six world-class research teams to investigate overcoming ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2017-10-26

    Oct 26, 2017 ... Four other teams use advanced genomics and protein engineering techniques to elucidate basic molecular mechanisms associated with tumor ... IDRC is supporting research that studies the most effective ways to empower women, prevent gender-based violence, and make digital platforms work for ...

  13. Performance Management and Sourcing Team Behaviour - Working Paper

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    The purpose of this development paper is to outline the main ideas of a Ph.d.-project research proposal,which deals with the influence of Performance Management on the behaviour and decisions of Sourcing Category Team members. The background for the project is described, as well as the main theory...

  14. Intra project team disagreement, conflict communications, and team performance in cross-functional new product teams: A decision-making quality perspective

    Directory of Open Access Journals (Sweden)

    Tsun Jin Chang

    2014-02-01

    Full Text Available This paper develops and examines a model of the antecedents and consequences of decision-making comprehensiveness during the new product development process. This model firstly suggests a concave relationship between intrateam task disagreement and decision-making comprehensiveness. It also conjectures that conflict communications influence the effectiveness of decision-making comprehensiveness on new product teams’ performance. An empirical test of the proposed framework involves a survey of 220 cross-functional new product teams. The findings show that an inverse U-shaped relationship exists between intrateam task disagreement and decision-making comprehensiveness. It also indicates that collaborative communication has a negative effect on innovativeness, whereas contentious communication adversely affects constraint adherence. However, decision-making comprehensiveness partially moderates the relationships between conflict communications and team performance. Some managerial and research implications of the findings were also discussed in this study.

  15. 2010 Atmospheric System Research (ASR) Science Team Meeting Summary

    Energy Technology Data Exchange (ETDEWEB)

    Dupont, DL

    2011-05-04

    This document contains the summaries of papers presented in poster format at the March 2010 Atmospheric System Research Science Team Meeting held in Bethesda, Maryland. More than 260 posters were presented during the Science Team Meeting. Posters were sorted into the following subject areas: aerosol-cloud-radiation interactions, aerosol properties, atmospheric state and surface, cloud properties, field campaigns, infrastructure and outreach, instruments, modeling, and radiation. To put these posters in context, the status of ASR at the time of the meeting is provided here.

  16. Elucidating the power in empowerment and the participation in participatory action research: a story about research team and elementary school change.

    Science.gov (United States)

    Dworski-Riggs, Deanne; Langhout, Regina Day

    2010-06-01

    Community psychologists are increasingly using Participatory Action Research (PAR) as a way to promote social justice by creating conditions that foster empowerment. Yet, little attention has been paid to the differences between the power structure that PAR advocates and the local community power structures. This paper seeks to evaluate the level of participation in a PAR project for multiple stakeholder groups, determine how PAR was adjusted to better fit community norms, and whether our research team was able to facilitate the emergence of PAR by adopting an approach that was relevant to the existing power relations. We conclude that power differences should not be seen as roadblocks to participation, but rather as moments of opportunity for the researchers to refine their methods and for the community and the community psychologist to challenge existing power structures.

  17. Team Learning and Team Composition in Nursing

    Science.gov (United States)

    Timmermans, Olaf; Van Linge, Roland; Van Petegem, Peter; Elseviers, Monique; Denekens, Joke

    2011-01-01

    Purpose: This study aims to explore team learning activities in nursing teams and to test the effect of team composition on team learning to extend conceptually an initial model of team learning and to examine empirically a new model of ambidextrous team learning in nursing. Design/methodology/approach: Quantitative research utilising exploratory…

  18. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  19. A Successful Test of Parallel Replication Teams in Teaching Research Methods

    Science.gov (United States)

    Standing, Lionel G.; Astrologo, Lisa; Benbow, Felecia F.; Cyr-Gauthier, Chelsea S.; Williams, Charlotte A.

    2016-01-01

    This paper describes the novel use of parallel student teams from a research methods course to perform a replication study, and suggests that this approach offers pedagogical benefits for both students and teachers, as well as potentially contributing to a resolution of the replication crisis in psychology today. Four teams, of five undergraduates…

  20. Research capacity building integrated into PHIT projects: leveraging research and research funding to build national capacity.

    Science.gov (United States)

    Hedt-Gauthier, Bethany L; Chilengi, Roma; Jackson, Elizabeth; Michel, Cathy; Napua, Manuel; Odhiambo, Jackline; Bawah, Ayaga

    2017-12-21

    Inadequate research capacity impedes the development of evidence-based health programming in sub-Saharan Africa. However, funding for research capacity building (RCB) is often insufficient and restricted, limiting institutions' ability to address current RCB needs. The Doris Duke Charitable Foundation's African Health Initiative (AHI) funded Population Health Implementation and Training (PHIT) partnership projects in five African countries (Ghana, Mozambique, Rwanda, Tanzania and Zambia) to implement health systems strengthening initiatives inclusive of RCB. Using Cooke's framework for RCB, RCB activity leaders from each country reported on RCB priorities, activities, program metrics, ongoing challenges and solutions. These were synthesized by the authorship team, identifying common challenges and lessons learned. For most countries, each of the RCB domains from Cooke's framework was a high priority. In about half of the countries, domain specific activities happened prior to PHIT. During PHIT, specific RCB activities varied across countries. However, all five countries used AHI funding to improve research administrative support and infrastructure, implement research trainings and support mentorship activities and research dissemination. While outcomes data were not systematically collected, countries reported holding 54 research trainings, forming 56 mentor-mentee relationships, training 201 individuals and awarding 22 PhD and Masters-level scholarships. Over the 5 years, 116 manuscripts were developed. Of the 59 manuscripts published in peer-reviewed journals, 29 had national first authors and 18 had national senior authors. Trainees participated in 99 conferences and projects held 37 forums with policy makers to facilitate research translation into policy. All five PHIT projects strongly reported an increase in RCB activities and commended the Doris Duke Charitable Foundation for prioritizing RCB, funding RCB at adequate levels and time frames and for allowing

  1. Characteristics of team briefings in gynecological surgery.

    Science.gov (United States)

    Forsyth, Katherine L; Hildebrand, Emily A; Hallbeck, M Susan; Branaghan, Russell J; Blocker, Renaldo C

    2018-02-24

    Preoperative briefings have been proven beneficial for improving team performance in the operating room. However, there has been minimal research regarding team briefings in specific surgical domains. As part of a larger project to develop a briefing structure for gynecological surgery, the study aimed to better understand the current state of pre-operative team briefings in one department of an academic hospital. Twenty-four team briefings were observed and video recorded. Communication was analyzed and social network metrics were created based on the team member verbal interactions. Introductions occurred in only 25% of the briefings. Network analysis revealed that average team briefings exhibited a hierarchical structure of communication, with the surgeon speaking the most frequently. The average network for resident-led briefings displayed a non-hierarchical structure with all team members communicating with the resident. Briefings conducted without a standardized protocol can produce variable communication between the role leading and the team members present. Copyright © 2018 Elsevier Ltd. All rights reserved.

  2. EVA Glove Research Team

    Science.gov (United States)

    Strauss, Alvin M.; Peterson, Steven W.; Main, John A.; Dickenson, Rueben D.; Shields, Bobby L.; Lorenz, Christine H.

    1992-01-01

    The goal of the basic research portion of the extravehicular activity (EVA) glove research program is to gain a greater understanding of the kinematics of the hand, the characteristics of the pressurized EVA glove, and the interaction of the two. Examination of the literature showed that there existed no acceptable, non-invasive method of obtaining accurate biomechanical data on the hand. For this reason a project was initiated to develop magnetic resonance imaging as a tool for biomechanical data acquisition and visualization. Literature reviews also revealed a lack of practical modeling methods for fabric structures, so a basic science research program was also initiated in this area.

  3. Data management for community research projects: A JGOFS case study

    Science.gov (United States)

    Lowry, Roy K.

    1992-01-01

    Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a

  4. Good Practice and Recommendations for Research Team Leadership

    Science.gov (United States)

    2017-05-01

    which makes the junior researcher receptive to branching out. Again, one avenue that facilitates expanding their skill set is the assignment detail...bit of “flavor” can be added by sharing with the audience any surprises, difficulties, or lessons learned along the way. A good team leader should

  5. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  6. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  7. Learning to Argue with Intermediate Macro Theory: A Semester-Long Team Writing Project

    Science.gov (United States)

    Strasser, Georg; Wolfe, Marketa Halova

    2014-01-01

    The authors describe their experience with integrating a semester-long economic analysis project into an intermediate macroeconomic theory course. Students work in teams of "economic advisors" to write a series of nested reports that analyze the current state of the economy, and propose and evaluate policies for a decision-maker. The…

  8. White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Paul T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bass, Bennett Richard [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-09-01

    ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the

  9. Partners in projects: preparing for public involvement in health and social care research.

    Science.gov (United States)

    Parkes, Jacqueline H; Pyer, Michelle; Wray, Paula; Taylor, Jane

    2014-09-01

    In recent years, several UK and, international funders of health and social care related research have adopted the policy of requiring explicit evidence of the 'public' voice in all aspects of project design. For many academic researchers engaged within research, evaluations or audit projects, this formal requirement to actively engage members of the public will present them with both benefits and challenges to securing knowledgeable, skilled, and confident lay representation onto project teams. This could potentially lead to the exploitation of those individuals who are available, appropriately informed, and adequately prepared for such activities. Currently, much of the preparation of patients or members of the public for research involvement tends to be aligned to specific projects; however, with the call for greater active and meaningful involvement of lay representatives in future national and international funding applications, there is clearly a growing need to 'train' sufficient numbers of confident and competent representatives to meet this growing demand. This paper describes the development of a specifically designed research awareness training programme and underpinning theoretical model, which has been specifically designed to support active and meaningful lay involvement in research, evaluations and audit projects. Developed over a four year period, the course is a culmination of learning extracted from a series of four completed research projects, which have incorporated an element of public and patient involvement (PPI) training in their overall design. Crown Copyright © 2014. Published by Elsevier Ireland Ltd. All rights reserved.

  10. Peer mentored teams to support undergraduate group work in higher education

    Science.gov (United States)

    Cinderey, Lynn Elizabeth

    This research starts with a set of practical research questions to investigate a problem which occurs in some computing undergraduate modules that use group work as part of the learning and assessment strategy. In this study final year students with experience in information systems project work and trained in team processes met with small groups of first year computing students with the aim of turning the first year project group into a team. This study seeks to explore the experience of the final year students as they take on the role of peer tutor looking at the problems they perceive within the first year teams and the skills and knowledge they use to help them. The study includes the recruitment and training of final year students (n=9) and allocation to first year teams. The final year students acted as co-researchers and team leaders in L4 Information Systems project work and recorded their thoughts and observations in a diary during the first semester of 2008/9 academic year. Diary data was supplemented by interview data from a sample of final year students (n=4). The sample was selected based on the richness of the data provided in the diaries and the number of meetings held with their teams. Rich data and thick descriptions were essential for a phenomenological examination of the experience of the final year students. A number of findings emerged. A critical approach to analysis revealed ongoing conflicts occurred across cultural divides within the first year teams that final year leaders did not articulate or appear fully aware of. This had important implications for individual team members. Other findings which relate to issues of changing levels of motivation in the teams over the ten weeks, roles adopted by the leaders, ability to systematize the project or team processes and the ability to reflect on unsuccessful strategies also had implications for peer mentoring training and support. The picture that emerged from the data suggested that lack of

  11. Team flow - The Magic of Collaboration

    NARCIS (Netherlands)

    M. Makowski; Dr. Paul Breman

    2008-01-01

    This paper is about the conceptual framework of team flow and the action research project at the Hogeschool Utrecht (University of Applied Sciences) which has been launched recently. Have you ever linked the performance of The Rolling Stones - as a long - standing successful music business - to

  12. The Search for Violacein-Producing Microbes to Combat Batrachochytrium dendrobatidis: A Collaborative Research Project between Secondary School and College Research Students

    Directory of Open Access Journals (Sweden)

    Larra Agate

    2015-10-01

    Full Text Available In this citizen science–aided, college laboratory–based microbiology research project, secondary school students collaborate with college research students on an investigation centered around bacterial species in the local watershed. This study specifically investigated the prevalence of violacein-producing bacterial isolates, as violacein has been demonstrated as a potential bioremediation treatment for outbreaks of the worldwide invasive chytrid, Batrachochytrium dendrobatidis (Bd. The impact of this invasion has been linked to widespread amphibian decline, and tracking of the spread of Bd is currently ongoing. Secondary school students participated in this research project by sterilely collecting water samples from a local watershed, documenting the samples, and completing the initial sample plating in a BSL1 environment. In the second phase of this project, trained college students working in courses and as research assistants in the academic year and summer term in a BSL2 laboratory facility were able to use physiological, biochemical, and molecular techniques to further identify individual isolates as well as characterize their properties. Collaboration between these learning spaces provides an increased interest in the community for environmentally relevant research projects and allows for an expansion of the research team to increase study robustness.

  13. Intellectual Data Analysis Method for Evaluation of Virtual Teams

    Directory of Open Access Journals (Sweden)

    Sandra Strigūnaitė

    2013-01-01

    Full Text Available The purpose of the article is to present a method for virtual team performance evaluation based on intelligent team member collaboration data analysis. The motivation for the research is based on the ability to create an evaluation method that is similar to ambiguous expert evaluations. The concept of the hierarchical fuzzy rule based method aims to evaluate the data from virtual team interaction instances related to implementation of project tasks. The suggested method is designed for project managers or virtual team leaders to help in virtual teamwork evaluation that is based on captured data analysis. The main point of the method is the ability to repeat human thinking and expert valuation process for data analysis by applying fuzzy logic: fuzzy sets, fuzzy signatures and fuzzy rules. The fuzzy set principle used in the method allows evaluation criteria numerical values to transform into linguistic terms and use it in constructing fuzzy rules. Using a fuzzy signature is possible in constructing a hierarchical criteria structure. This structure helps to solve the problem of exponential increase of fuzzy rules including more input variables. The suggested method is aimed to be applied in the virtual collaboration software as a real time teamwork evaluation tool. The research shows that by applying fuzzy logic for team collaboration data analysis it is possible to get evaluations equal to expert insights. The method includes virtual team, project task and team collaboration data analysis. The advantage of the suggested method is the possibility to use variables gained from virtual collaboration systems as fuzzy rules inputs. Information on fuzzy logic based virtual teamwork collaboration evaluation has evidence that can be investigated in the future. Also the method can be seen as the next virtual collaboration software development step.

  14. Team dynamics within quality improvement teams: a scoping review.

    Science.gov (United States)

    Rowland, Paula; Lising, Dean; Sinclair, Lynne; Baker, G Ross

    2018-03-31

    This scoping review examines what is known about the processes of quality improvement (QI) teams, particularly related to how teams impact outcomes. The aim is to provide research-informed guidance for QI leaders and to inform future research questions. Databases searched included: MedLINE, EMBASE, CINAHL, Web of Science and SCOPUS. Eligible publications were written in English, published between 1999 and 2016. Articles were included in the review if they examined processes of the QI team, were related to healthcare QI and were primary research studies. Studies were excluded if they had insufficient detail regarding QI team processes. Descriptive detail extracted included: authors, geographical region and health sector. The Integrated (Health Care) Team Effectiveness Model was used to synthesize findings of studies along domains of team effectiveness: task design, team process, psychosocial traits and organizational context. Over two stages of searching, 4813 citations were reviewed. Of those, 48 full-text articles are included in the synthesis. This review demonstrates that QI teams are not immune from dysfunction. Further, a dysfunctional QI team is not likely to influence practice. However, a functional QI team alone is unlikely to create change. A positive QI team dynamic may be a necessary but insufficient condition for implementing QI strategies. Areas for further research include: interactions between QI teams and clinical microsystems, understanding the role of interprofessional representation on QI teams and exploring interactions between QI team task, composition and process.

  15. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  16. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  17. Team role stress : relationships with team learning and performance in project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Gevers, J.M.P.; Heijden, van der B.I.J.M.; Poell, R.F.

    2012-01-01

    Although role stress literature has almost exclusively focused on individual role incumbents, it is conceivable that shared conditions of ambiguity, conflict, and quantitative or qualitative overload may give rise to a collective experience of role stress in teams. Testing a multilevel mediation

  18. The Importance of Team Sex Composition in Team-Training Research Employing Complex Psychomotor Tasks.

    Science.gov (United States)

    Jarrett, Steven M; Glaze, Ryan M; Schurig, Ira; Arthur, Winfred

    2017-08-01

    The relationship between team sex composition and team performance on a complex psychomotor task was examined because these types of tasks are commonly used in the lab-based teams literature. Despite well-documented sex-based differences on complex psychomotor tasks, the preponderance of studies-mainly lab based-that use these tasks makes no mention of the sex composition of teams across or within experimental conditions. A sample of 123 four-person teams with varying team sex composition learned and performed a complex psychomotor task, Steal Beasts Pro PE. Each team completed a 5-hr protocol whereby they conducted several performance missions. The results indicated significant large mean differences such that teams with larger proportions of males had higher performance scores. These findings demonstrate the potential effect of team sex composition on the validity of studies that use complex psychomotor tasks to explore and investigate team performance-related phenomena when (a) team sex composition is not a focal variable of interest and (b) it is not accounted for or controlled. Given the proclivity of complex psychomotor action-based tasks used in lab-based team studies, it is important to understand and control for the impact of team sex composition on team performance. When team sex composition is not controlled for, either methodologically or statistically, it may affect the validity of the results in teams studies using these types of tasks.

  19. Integration of Slack, a cloud-based team collaboration application, into research coordination

    Directory of Open Access Journals (Sweden)

    Miriam Gofine

    2017-06-01

    Full Text Available Background: Practitioners of epidemiology require efficient real-time communication and shared access to numerous documents in order to effectively manage a study. Much of this communication involves study logistics and does not require use of Protected Health Information. Slack is a team collaboration app; it archives all direct messages and group conversations, hosts documents internally, and integrates with the Google Docs application. Slack has both desktop and mobile applications, allowing users to communicate in real-time without the need to find email addresses or phone numbers or create contact lists.  Method: We piloted the integration of Slack into our research team of one faculty member, one research coordinator, and approximately 20 research assistants. Statistics describing the app’s usage were calculated twelve months after its implementation.  Results: Results indicating heavy usage by both research professionals and assistants are presented. our Slack group included a cumulative 51 users. Between October 2015 and November 2016, approximately 10,600 messages were sent through Slack; 53% were sent by RA’s and 47% were sent by us. Of the 106 files stored on Slack, 82% were uploaded by research staff. In a January 2016 survey, 100% of RA’s agreed or strongly agreed that Slack improved communication within the team.  Conclusion: We demonstrate a model for integration of communication technology into academic activities by research teams. Slack is easily integrated into the workflow at an urban, academic medical center and is adopted by users as a highly effective tool for meeting research teams’ communication and document management needs.

  20. Culture and teams.

    Science.gov (United States)

    Kirkman, Bradley L; Shapiro, Debra L; Lu, Shuye; McGurrin, Daniel P

    2016-04-01

    We first review research on culture effects in teams, illustrating that mean levels of team cultural values have main (i.e. direct) effects, indirect effects (i.e. mediated by intervening variables), and moderating influences on team processes and outcomes. Variance in team cultural values or on country of origin (i.e. nationality diversity) also has main effects on team functioning, and we highlight contextual variables that strengthen or weaken these main effects. We next review research examining the effect of variance in team cultural values on global virtual teams, specifically. Finally, we review research on how cultural values shape employees' receptivity to empowering leadership behavior in teams. We conclude by discussing critical areas for future research. Published by Elsevier Ltd.

  1. Elucidating the Power in Empowerment and the Participation in Participatory Action Research: A Story About Research Team and Elementary School Change

    Science.gov (United States)

    Dworski-Riggs, Deanne

    2010-01-01

    Community psychologists are increasingly using Participatory Action Research (PAR) as a way to promote social justice by creating conditions that foster empowerment. Yet, little attention has been paid to the differences between the power structure that PAR advocates and the local community power structures. This paper seeks to evaluate the level of participation in a PAR project for multiple stakeholder groups, determine how PAR was adjusted to better fit community norms, and whether our research team was able to facilitate the emergence of PAR by adopting an approach that was relevant to the existing power relations. We conclude that power differences should not be seen as roadblocks to participation, but rather as moments of opportunity for the researchers to refine their methods and for the community and the community psychologist to challenge existing power structures. PMID:20232244

  2. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  3. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  4. Tohoku Earthquake-associated Marine Sciences: the research project for the Great East Japan Earthquake on March 11, 2011

    Science.gov (United States)

    Kitazato, Hiroshi; Kijima, Akihiro; Kogure, Kazuhiro; Hara, Motoyuki; Nagata, Toshi; Fujikura, Kasunori; Sonoda, Akira

    2015-04-01

    At 2:46 pm on March 11, 2011, a huge earthquake (M 9.0) occurred off the Pacific coast of Tohoku Region, Japan. The subsequent Tsunamis hit the coasts and seriously damaged fishing villages and towns in the area. Tohoku Region faces Northwestern Pacific where is one of the most productive oceans on the Earth. Then, what happened to the marine ecosystems in the Tohoku Region? What happened to the fishery bioresources? What is the mechanism to sustain high productivity in the Region? Is the ecosystem restoring after 4 years? What is required for the recovery of fisheries in the area? In order to answer these questions, the 10 years research project, TEAMS (Tohoku Ecosystem-Associated Marine Sciences) was launched in January 2012 funded by MEXT (Ministry of Education, Culture, Sports, Science and Technology, Japan) to conduct comprehensive research on the area. Tohoku University (TU), Atmosphere and Ocean Research Institute, the University of Tokyo (AORIUT), Japan Agency for Marine-Earth Science and Technology (JAMSTEC), and 25 other institutions are conducting research for this project in close association with local government and fishery people. Currently, approximately 400 people (200 scientists, 160 students and others) covering physical, chemical, biological, and geological sciences including modeling take part in the project from all over Japan. MEXT also supports TEAMS by constructing R/V Shinsei Maru in 2013 for the oceanic investigations in the region. In this report, the overview of the ecosystem before and after the disaster, major findings and challenges of TEAMS will be described.

  5. 78 FR 70076 - Large Scale Networking (LSN)-Middleware and Grid Interagency Coordination (MAGIC) Team

    Science.gov (United States)

    2013-11-22

    ... projects. The MAGIC Team reports to the Large Scale Networking (LSN) Coordinating Group (CG). Public... Coordination (MAGIC) Team AGENCY: The Networking and Information Technology Research and Development (NITRD... MAGIC Team meetings are held on the first Wednesday of each month, 2:00-4:00 p.m., at the National...

  6. What makes maternity teams effective and safe? Lessons from a series of research on teamwork, leadership and team training.

    Science.gov (United States)

    Siassakos, Dimitrios; Fox, Robert; Bristowe, Katherine; Angouri, Jo; Hambly, Helen; Robson, Lauren; Draycott, Timothy J

    2013-11-01

    We describe lessons for safety from a synthesis of seven studies of teamwork, leadership and team training across a healthcare region. Two studies identified successes and challenges in a unit with embedded team training: a staff survey demonstrated a positive culture but a perceived need for greater senior presence; training improved actual emergency care, but wide variation in team performance remained. Analysis of multicenter simulation records showed that variation in patient safety and team efficiency correlated with their teamwork but not individual knowledge, skills or attitudes. Safe teams tended to declare the emergency earlier, hand over in a more structured way, and use closed-loop communication. Focused and directed communication was also associated with better patient-actor perception of care. Focus groups corroborated these findings, proposed that the capability and experience of the leader is more important than seniority, and identified teamwork and leadership issues that require further research. © 2013 Nordic Federation of Societies of Obstetrics and Gynecology.

  7. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  8. Understanding palliative care on the heart failure care team: an innovative research methodology.

    Science.gov (United States)

    Lingard, Lorelei A; McDougall, Allan; Schulz, Valerie; Shadd, Joshua; Marshall, Denise; Strachan, Patricia H; Tait, Glendon R; Arnold, J Malcolm; Kimel, Gil

    2013-05-01

    There is a growing call to integrate palliative care for patients with advanced heart failure (HF). However, the knowledge to inform integration efforts comes largely from interview and survey research with individual patients and providers. This work has been critically important in raising awareness of the need for integration, but it is insufficient to inform solutions that must be enacted not by isolated individuals but by complex care teams. Research methods are urgently required to support systematic exploration of the experiences of patients with HF, family caregivers, and health care providers as they interact as a care team. To design a research methodology that can support systematic exploration of the experiences of patients with HF, caregivers, and health care providers as they interact as a care team. This article describes in detail a methodology that we have piloted and are currently using in a multisite study of HF care teams. We describe three aspects of the methodology: the theoretical framework, an innovative sampling strategy, and an iterative system of data collection and analysis that incorporates four data sources and four analytical steps. We anticipate that this innovative methodology will support groundbreaking research in both HF care and other team settings in which palliative integration efforts are emerging for patients with advanced nonmalignant disease. Copyright © 2013 U.S. Cancer Pain Relief Committee. Published by Elsevier Inc. All rights reserved.

  9. Understanding Suicidal Behaviour in Young People Referred to Specialist CAMHS: A Qualitative Psychoanalytic Clinical Research Project

    Science.gov (United States)

    Anderson, Jan; Hurst, Margaret; Marques, Ana; Millar, David; Moya, Sue; Pover, Lesley; Stewart, Sue

    2012-01-01

    A qualitative psychoanalytic clinical research project using a post-Kleinian contemporary approach was undertaken by a team of seven qualified and experienced child psychotherapists working in community Tier 3 Child and Adolescent Mental Health Services (CAMHS). A number of referred young people who deliberately harmed themselves or attempted…

  10. A Transcription and Translation Protocol for Sensitive Cross-Cultural Team Research.

    Science.gov (United States)

    Clark, Lauren; Birkhead, Ana Sanchez; Fernandez, Cecilia; Egger, Marlene J

    2017-10-01

    Assurance of transcript accuracy and quality in interview-based qualitative research is foundational for data accuracy and study validity. Based on our experience in a cross-cultural ethnographic study of women's pelvic organ prolapse, we provide practical guidance to set up step-by-step interview transcription and translation protocols for team-based research on sensitive topics. Beginning with team decisions about level of detail in transcription, completeness, and accuracy, we operationalize the process of securing vendors to deliver the required quality of transcription and translation. We also share rubrics for assessing transcript quality and the team protocol for managing transcripts (assuring consistency of format, insertion of metadata, anonymization, and file labeling conventions) and procuring an acceptable initial translation of Spanish-language interviews. Accurate, complete, and systematically constructed transcripts in both source and target languages respond to the call for more transparency and reproducibility of scientific methods.

  11. 77 FR 58416 - Large Scale Networking (LSN); Middleware and Grid Interagency Coordination (MAGIC) Team

    Science.gov (United States)

    2012-09-20

    ..., Grid, and cloud projects. The MAGIC Team reports to the Large Scale Networking (LSN) Coordinating Group... Coordination (MAGIC) Team AGENCY: The Networking and Information Technology Research and Development (NITRD.... Dates/Location: The MAGIC Team meetings are held on the first Wednesday of each month, 2:00-4:00pm, at...

  12. The Link Class Project: Collaborative virtual teams between Peru and The Netherlands

    OpenAIRE

    Mariella Olivos Rossini; Sandra Rincón; Anne-Francoise Rutkowski

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the effects of a campus based internationalization strategy supported by the use of technology. Based on previous experiences with virtual classrooms, the authors adhere to the ancient Chinese philosophe...

  13. Team Effectiveness and Team Development in CSCL

    Science.gov (United States)

    Fransen, Jos; Weinberger, Armin; Kirschner, Paul A.

    2013-01-01

    There is a wealth of research on computer-supported cooperative work (CSCW) that is neglected in computer-supported collaborative learning (CSCL) research. CSCW research is concerned with contextual factors, however, that may strongly influence collaborative learning processes as well, such as task characteristics, team formation, team members'…

  14. Reflection on an interprofessional communitybased participatory research project

    Directory of Open Access Journals (Sweden)

    A Rhoda

    2016-11-01

    Full Text Available Background. A collaborative interprofessional research project that involved community members was beneficial to community development.Objective. To draw upon the experiences of academics relating to their involvement in an interprofessional community-based participatory research(CBPR project.Methods. A Delphi study was applied as a self-reflective evaluation process to reach consensus on the lessons learnt from participation in a CBPR project. Round one of the Delphi employed closed-ended questions and the responses were analysed descriptively using Microsoft Excel (USA. The second round consisted mainly of open-ended questions and responses, and was analysed qualitatively. Ethical clearance was obtained from the University of the Western Cape research committee.Results. Based on round one of the Delphi study, it became evident that recognition of the community as a unit of identity, addressing health from physical, emotional and social perspectives and formation of long-term commitments were the CBPR principles most applied. Disseminating information to all partners and facilitation of the collaborative equitable involvement of all partners in all phases of the research were the principles least applied. Themes that emerged from the second round of the Delphi included the identification of clear objectives based on the needs of the community, a shift from identification of the needs of the community to the implementation of strategies, and the creation of capacity-building opportunities for all stakeholders.Conclusion. In a reflection on the research process, the interprofessional team of academics found that the basics of CBPR should be attended to first. A focus on clear objectives, implementation strategies and capacity building is important in CBPR.

  15. Assessment team report on flight-critical systems research at NASA Langley Research Center

    Science.gov (United States)

    Siewiorek, Daniel P. (Compiler); Dunham, Janet R. (Compiler)

    1989-01-01

    The quality, coverage, and distribution of effort of the flight-critical systems research program at NASA Langley Research Center was assessed. Within the scope of the Assessment Team's review, the research program was found to be very sound. All tasks under the current research program were at least partially addressing the industry needs. General recommendations made were to expand the program resources to provide additional coverage of high priority industry needs, including operations and maintenance, and to focus the program on an actual hardware and software system that is under development.

  16. Developing Your Dream Team

    Science.gov (United States)

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  17. Establishing and maintaining international collaborative research teams: an autobiographical insight

    Directory of Open Access Journals (Sweden)

    T J Carr

    2013-07-01

    Full Text Available Despite the growing impetus for international collaborative research teams (ICRT, there are relatively few resources available to guide and support researchers through the processes of establishing and maintaining ICRTs. In particular, no articles were found that provided researchers’ firsthand accounts of being a member of such a team. Having access to such personal accounts can help both experienced and novice researchers learn more directly about what to expect, as well as the benefits, challenges, pitfalls, and success strategies for establishing and maintaining ICRTs. The authors used phenomenological autobiographical reflective journaling to capture their experiences as members of ICRTs. In this article we provide an overview of key themes that emerged from the analysis of our reflections as members of ICRTs. These themes include: benefits, challenges, and strategies for success. Our aim is to share our first-hand experiences of what it is like to establish and participate in ICRT. It is not our intention to provide readers with prescriptive guidelines on how to set up and maintain ICRTs. Every ICRT is unique and some of these ideas may or may not apply in every case. Instead, we are describing what worked for us, hoping that others may benefit from our experience. Consequently, we suggest that the focus of ICRT should be on the benefits thereof which promote and encourage interaction between disciplines, transfer of knowledge and techniques and personal and professional development. Keywords: international, collaborative, research, teams, interdisciplinary

  18. The Motivated Project Team

    Science.gov (United States)

    2009-12-01

    Financial incentives that match level of achievement • Regular, constructive feedback. Hierarchy of Needs ( Abraham H. Maslow ) Team members can be...Much has been written regarding motivational Defense AT&L: November-December 2009 58 theory . To further complicate mat- ters, some motivational... theories clearly contradict others, and a manager’s ability to motivate is, to no small degree, related to his or her leadership approach and inter

  19. Implementation of quality management in early stages of research and development projects at a university.

    Science.gov (United States)

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  20. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  1. Continued multidisciplinary project-based learning - implementation in health informatics.

    Science.gov (United States)

    Wessel, C; Spreckelsen, C

    2009-01-01

    Problem- and project-based learning are approved methods to train students, graduates and post-graduates in scientific and other professional skills. The students are trained on realistic scenarios in a broader context. For students specializing in health informatics we introduced continued multidisciplinary project-based learning (CM-PBL) at a department of medical informatics. The training approach addresses both students of medicine and students of computer science. The students are full members of an ongoing research project and develop a project-related application or module, or explore or evaluate a sub-project. Two teachers guide and review the students' work. The training on scientific work follows a workflow with defined milestones. The team acts as peer group. By participating in the research team's work the students are trained on professional skills. A research project on a web-based information system on hospitals built the scenario for the realistic context. The research team consisted of up to 14 active members at a time, who were scientists and students of computer science and medicine. The well communicated educational approach and team policy fostered the participation of the students. Formative assessment and evaluation showed a considerable improvement of the students' skills and a high participant satisfaction. Alternative education approaches such as project-based learning empower students to acquire scientific knowledge and professional skills, especially the ability of life-long learning, multidisciplinary team work and social responsibility.

  2. Using a tag team of undergraduate researchers to construct an empirical model of auroral Poynting flux, from satellite data

    Science.gov (United States)

    Cosgrove, R. B.; Bahcivan, H.; Klein, A.; Ortega, J.; Alhassan, M.; Xu, Y.; Chen, S.; Van Welie, M.; Rehberger, J.; Musielak, S.; Cahill, N.

    2012-12-01

    Empirical models of the incident Poynting flux and particle kinetic energy flux, associated with auroral processes, have been constructed using data from the FAST satellite. The models were constructed over a three-year period by a tag-team of three groups of undergraduate researchers from Worcester Polytechnic Institute (WPI), working under the supervision of researchers at SRI International, a nonprofit research institute. Each group spent one academic quarter in residence at SRI, in fulfillment of WPI's Major Qualifying Project (MQP), required for graduation from the Department of Electrical and Computer Engineering. The MQP requires a written group report, which was used to transition from one group to the next. The student's research involved accessing and processing a data set of 20,000 satellite orbits, replete with flaws associated with instrument failures, which had to be removed. The data had to be transformed from the satellite reference frame into solar coordinates, projected to a reference altitude, sorted according to geophysical conditions, and etc. The group visits were chaperoned by WPI, and were jointly funded. Researchers at SRI were supported by a grant from the National Science Foundation, which was tailored to accommodate the undergraduate tag-team approach. The NSF grant extended one year beyond the student visits, with increased funding in the final year, permitting the researchers at SRI to exercise quality control, and to produce publications. It is expected that the empirical models will be used as inputs to large-scale general circulation models (GCMs), to specify the atmospheric heating rate at high altitudes.; Poynting Flux with northward IMF ; Poynting flux with southward IMF

  3. Reducing Teenage Binge Drinking and Drunk Driving on the Reservation: The Pikanii Action Team

    Science.gov (United States)

    Still Smoking, Dorothy; Bull Shoe, Debbie Whitegrass

    2012-01-01

    The Pikanii Action Team project addressed the issues of teenage drinking and drunk driving on the Blackfeet Reservation. Basing their actions on locally-generated research, the Pikanii Action Team conducted a series of activities and initiatives to promote public awareness and action related to high-risk activities related to drinking. The team's…

  4. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  5. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  6. Assessing and evaluating multidisciplinary translational teams: a mixed methods approach.

    Science.gov (United States)

    Wooten, Kevin C; Rose, Robert M; Ostir, Glenn V; Calhoun, William J; Ameredes, Bill T; Brasier, Allan R

    2014-03-01

    A case report illustrates how multidisciplinary translational teams can be assessed using outcome, process, and developmental types of evaluation using a mixed-methods approach. Types of evaluation appropriate for teams are considered in relation to relevant research questions and assessment methods. Logic models are applied to scientific projects and team development to inform choices between methods within a mixed-methods design. Use of an expert panel is reviewed, culminating in consensus ratings of 11 multidisciplinary teams and a final evaluation within a team-type taxonomy. Based on team maturation and scientific progress, teams were designated as (a) early in development, (b) traditional, (c) process focused, or (d) exemplary. Lessons learned from data reduction, use of mixed methods, and use of expert panels are explored.

  7. Amish-Initiated Burn Care Project: Case Report and Lessons Learned in Participatory Research.

    Science.gov (United States)

    Hess, Rosanna F

    2017-03-01

    This case report describes the phases of an Amish Burn Care Project and the lessons learned throughout the process. Data sources to construct the case report included participant observation, interviews, archival documents, and a focus group. The narrative is organized into five phases of a participatory research approach: engagement, formalization, mobilization, maintenance, and expansion. Community-initiated research led to legitimate change, working together for change took time, team members grew in mutual trust and respect for each other, cultural humility brought personal and professional growth, and capacity building took place through mutually supported efforts.

  8. Team Learning Beliefs and Behaviours in Response Teams

    Science.gov (United States)

    Boon, Anne; Raes, Elisabeth; Kyndt, Eva; Dochy, Filip

    2013-01-01

    Purpose: Teams, teamwork and team learning have been the subject of many research studies over the last decades. This article aims at investigating and confirming the Team Learning Beliefs and Behaviours (TLB&B) model within a very specific population, i.e. police and firemen teams. Within this context, the paper asks whether the team's…

  9. COLLABORATING WITH THE COMMUNITY: THE EXTRA-TERRITORIAL TRANSLATIONAL RESEARCH TEAM.

    Science.gov (United States)

    Kotarba, Joseph A; Croisant, Sharon A; Elferink, Cornelis; Scott, Lauren E

    2014-12-05

    The purpose of the present study is to suggest a revision of the team science concept to the more inclusive extra-territorial research team (ETRT). Translational thinking is largely marked by the perception of the team as a thing-like structure at the center of the scientific activity. Collaboration accordingly involves bringing external others (e.g., scientists, community members, and clinicians) into the team through limited or dependent participation. We suggest that a promising and innovative way to see the team is as an idea : a schema for assembling and managing relationships among otherwise disparate individuals with vested interests in the problem at hand. Thus, the ETRT can be seen as a process as well as an object . We provide a case study derived from a qualitative analysis of the impact of the logic of translational science on a team assessment of environmental health following an off-coast oil disaster. The ETRT in question displayed the following principles of constructive relationship management: a high sense of adventure given the quick pace and timeliness given the relevance of the oil spill to all team members; regular meetings in the community to avoid the appearance of academic hegemony; open access by lay as well as institutional scientists; integration of emergency management coordinators into the group; and the languages of public health, environmental pharmacology/toxicology and coastal culture seamlessly interwoven in discussion. The ETRT model is an appropriate strategy for mobilizing and integrating the knowledge and skills needed for comprehensive science and service responses, especially during crisis.

  10. When is educational specialization heterogeneity related to creativity in research and development teams? Transformational leadership as a moderator.

    Science.gov (United States)

    Shin, Shung J; Zhou, Jing

    2007-11-01

    The authors examined conditions under which teams' educational specialization heterogeneity was positively related to team creativity. Using a sample of 75 research and development teams, the authors theorized and found that transformational leadership and educational specialization heterogeneity interacted to affect team creativity in such a way that when transformational leadership was high, teams with greater educational specialization heterogeneity exhibited greater team creativity. In addition, teams' creative efficacy mediated this moderated relationship among educational specialization heterogeneity, transformational leadership, and team creativity. The authors discuss the implications of these results for research and practice. (c) 2007 APA

  11. A Method for Knowledge Management and Communication Within and Across Multidisciplinary Teams

    Directory of Open Access Journals (Sweden)

    Don Flynn

    2009-06-01

    Full Text Available The use of knowledge management (KM and communication tools in an applied scientific arena where research is performed and knowledge must be managed within and across multidisciplinary teams and organizations is a challenge. Teams of scientists and engineers from up to 17 different technical specialties required knowledge management tools for developing multiple environmental impact statements under challenging circumstances. Factors that contributed to the success of the KM tools included 1 pairing of project staff with Knowledge Systems staff to determine system requirements, 2 the use of the tools by the team as they were being developed thus allowing many opportunities for feedback and interaction, 3 developing the tools to approximate the overall project structure and work flow already in place, 4 providing immediate assistance to the project team as they learned to use the new KM tools, and 5 replacing earlier practices with the new KM approach by "burning the bridges" to past practices after the team had learned to use the new KM tools.

  12. Structuring Effective Student Teams.

    Science.gov (United States)

    Dickson, Ellen L.

    1997-01-01

    Experience with student teams working on policy analysis projects indicates the need for faculty supervision of teams in the process of addressing complex issues. The problem-solving approach adopted in one policy analysis course is described, including assignments and tasks, issues and sponsors, team dynamics, conflict management, and the…

  13. The Climate Impacts Research Consortium: Lessons Learned from the Evaluation of Co-production projects

    Science.gov (United States)

    Sokolovska, I.; Andrepont, J. A.; Lach, D.

    2017-12-01

    The Pacific Northwest Climate Impacts Research Consortium (CIRC) is a climate-science-to-climate-action team funded by the National Oceanic and Atmospheric Administration (NOAA), member of NOAA's Regional Integrated Sciences and Assessments (RISA) program. The internal evaluation of the last 6 years of CIRC's work focused on the co-production of knowledge process. The evaluation was based on CIRC's Reflection and Logic model and used a mixed methods design. During regular monthly meetings in 2014/15, all CIRC PIs reflected on the co-production process and presented their evaluation of the projects they worked on. Additionally, we conducted semi-structured interviews with CIRC participants, purposefully targeting key informants. The Climate Impacts Research Consortium teams also administered surveys to assess participants' experiences of the coproduction process as they were engaging in it. Identifying and cultivating an informant from the local stakeholder group with deep, accessible roots within the target community can lead to better coproduction results than having to build those relationships from naught. Across projects, most participants agreed that the project increased their understanding of their area's hazards and by the end of the project most participants were confident the project would produce useful results for themselves. Finally, most participants intended to share what they had learned from this experience with their colleagues and we found that co-production built capacities necessary for communities to incorporate climate change in discussions even after the end of CIRC's participation. During the projects, the involvement of non-traditional participants along with experts was critical to success and a lot of work and preparation needs to be put into the planning of any co-production meeting to overcome various barriers to communication and build trust.

  14. RMS: a platform for managing cross-disciplinary and multi-institutional research project collaboration.

    Science.gov (United States)

    Luo, Jake; Apperson-Hansen, Carolyn; Pelfrey, Clara M; Zhang, Guo-Qiang

    2014-11-30

    Cross-institutional cross-disciplinary collaboration has become a trend as researchers move toward building more productive and innovative teams for scientific research. Research collaboration is significantly changing the organizational structure and strategies used in the clinical and translational science domain. However, due to the obstacles of diverse administrative structures, differences in area of expertise, and communication barriers, establishing and managing a cross-institutional research project is still a challenging task. We address these challenges by creating an integrated informatics platform to reduce the barriers to biomedical research collaboration. The Request Management System (RMS) is an informatics infrastructure designed to transform a patchwork of expertise and resources into an integrated support network. The RMS facilitates investigators' initiation of new collaborative projects and supports the management of the collaboration process. In RMS, experts and their knowledge areas are categorized and managed structurally to provide consistent service. A role-based collaborative workflow is tightly integrated with domain experts and services to streamline and monitor the life-cycle of a research project. The RMS has so far tracked over 1,500 investigators with over 4,800 tasks. The research network based on the data collected in RMS illustrated that the investigators' collaborative projects increased close to 3 times from 2009 to 2012. Our experience with RMS indicates that the platform reduces barriers for cross-institutional collaboration of biomedical research projects. Building a new generation of infrastructure to enhance cross-disciplinary and multi-institutional collaboration has become an important yet challenging task. In this paper, we share the experience of developing and utilizing a collaborative project management system. The results of this study demonstrate that a web-based integrated informatics platform can facilitate and

  15. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  16. Research on the development of high-level martial-art teams of universities in Shanghai

    Directory of Open Access Journals (Sweden)

    MING Lei

    2014-06-01

    Full Text Available Five Universities with high level martial art sport teams in Shanghai have been chosen for research to initiate a comprehensive investigation and analysis for following aspects during establishment and development of the martial-art teams: status of athletes and coachers, status of learning and training of martial-art teams, martial-art team stimulating system and logistic support by using documentary, questionnaire survey, interview and mathematic survey, so as to find existing disadvantages and their relevant solutions.

  17. On teams, teamwork, and team performance: discoveries and developments.

    Science.gov (United States)

    Salas, Eduardo; Cooke, Nancy J; Rosen, Michael A

    2008-06-01

    We highlight some of the key discoveries and developments in the area of team performance over the past 50 years, especially as reflected in the pages of Human Factors. Teams increasingly have become a way of life in many organizations, and research has kept up with the pace. We have characterized progress in the field in terms of eight discoveries and five challenges. Discoveries pertain to the importance of shared cognition, the measurement of shared cognition, advances in team training, the use of synthetic task environments for research, factors influencing team effectiveness, models of team effectiveness, a multidisciplinary perspective, and training and technological interventions designed to improve team effectiveness. Challenges that are faced in the coming decades include an increased emphasis on team cognition; reconfigurable, adaptive teams; multicultural influences; and the need for naturalistic study and better measurement. Work in human factors has contributed significantly to the science and practice of teams, teamwork, and team performance. Future work must keep pace with the increasing use of teams in organizations. The science of teams contributes to team effectiveness in the same way that the science of individual performance contributes to individual effectiveness.

  18. Increasing Student-Learning Team Effectiveness with Team Charters

    Science.gov (United States)

    Hunsaker, Phillip; Pavett, Cynthia; Hunsaker, Johanna

    2011-01-01

    Because teams are a ubiquitous part of most organizations today, it is common for business educators to use team assignments to help students experientially learn about course concepts and team process. Unfortunately, students frequently experience a number of problems during team assignments. The authors describe the results of their research and…

  19. Development of an Integrated Team Training Design and Assessment Architecture to Support Adaptability in Healthcare Teams

    Science.gov (United States)

    2017-10-01

    provision of training is not a major focus of this project, trainees were able to practice trauma management skills as well as leadership skills...SUBJECT TERMS Military healthcare team; Trauma teams; Team training; Teamwork; Adaptive performance; Leadership ; Simulation; Modeling; Bayesian belief...ABBREVIATIONS Healthcare team Trauma Trauma teams Team training Teamwork Adaptability Adaptive performance Leadership Simulation Modeling

  20. Computer-Aided Systems Engineering for Flight Research Projects Using a Workgroup Database

    Science.gov (United States)

    Mizukami, Masahi

    2004-01-01

    An online systems engineering tool for flight research projects has been developed through the use of a workgroup database. Capabilities are implemented for typical flight research systems engineering needs in document library, configuration control, hazard analysis, hardware database, requirements management, action item tracking, project team information, and technical performance metrics. Repetitive tasks are automated to reduce workload and errors. Current data and documents are instantly available online and can be worked on collaboratively. Existing forms and conventional processes are used, rather than inventing or changing processes to fit the tool. An integrated tool set offers advantages by automatically cross-referencing data, minimizing redundant data entry, and reducing the number of programs that must be learned. With a simplified approach, significant improvements are attained over existing capabilities for minimal cost. By using a workgroup-level database platform, personnel most directly involved in the project can develop, modify, and maintain the system, thereby saving time and money. As a pilot project, the system has been used to support an in-house flight experiment. Options are proposed for developing and deploying this type of tool on a more extensive basis.

  1. Astronomy Research Seminars

    Science.gov (United States)

    Genet, Russell M.

    2018-06-01

    Astronomy Research Seminars are offered by a rapidly growing number of community colleges and universities. Over the past decade some 120 student team research papers have been published with approximately 500 coauthors. Each team manages their own research, obtains and analyzes original data, writes a team paper, obtains an external review, submits their paper for publication, and gives a public PowerPoint presentation. The student teams are supported by: (1) an extensive community-of-practice which consists of professional and amateur astronomers, educators, and Seminar graduates; (2) the Institute for Student Astronomical Research (www.in4star.org); (3) the Small Telescope Astronomy Research Handbook and (4) an in-person/online, open-source Canvas learning management system with videos, quizzes, and other, extensive supporting material. Team research projects are completed in a semester or less and are managed by the students themselves. The Seminars have expanded from double star astronomy to asteroid astrometry, eclipsing binary times of minima, and exoplanet transits. Conducting authentic research inspires students, provides them with important skills in teamwork, project management and scientific literacy, and gives them confidence in their abilities to participate in scientific research. Being coauthors of published papers boosts student educational careers with respect to admissions and scholarships.

  2. "Teamwork" or "Working as a Team"? The Theory and Practice of Top Team Working in UK Higher Education

    Science.gov (United States)

    Woodfield, Steve; Kennie, Tom

    2008-01-01

    This article focuses on the theory and practice of teamwork in "top management teams" in UK higher education institutions. It is informed by some of the key findings from a recent two-year research project sponsored by the Leadership Foundation for Higher Education that investigated the different ways in which UK higher education…

  3. Team cohesion and team success in sport.

    Science.gov (United States)

    Carron, Albert V; Bray, Steven R; Eys, Mark A

    2002-02-01

    The main aim of this study was to examine the relationship between task cohesiveness and team success in elite teams using composite team estimates of cohesion. A secondary aim was to determine statistically the consistency (i.e. 'groupness') present in team members' perceptions of cohesion. Elite university basketball teams (n = 18) and club soccer teams (n = 9) were assessed for cohesiveness and winning percentages. Measures were recorded towards the end of each team's competitive season. Our results indicate that cohesiveness is a shared perception, thereby providing statistical support for the use of composite team scores. Further analyses indicated a strong relationship between cohesion and success (r = 0.55-0.67). Further research using multi-level statistical techniques is recommended.

  4. From industry to academia: Benefits of integrating a professional project management standard into (geo)science research

    Science.gov (United States)

    Cristini, Luisa

    2017-04-01

    Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.

  5. Group, Team, or Something in Between? Conceptualising and Measuring Team Entitativity

    Science.gov (United States)

    Vangrieken, Katrien; Boon, Anne; Dochy, Filip; Kyndt, Eva

    2017-01-01

    The current gap between traditional team research and research focusing on non-strict teams or groups such as teacher teams hampers boundary-crossing investigations of and theorising on teamwork and collaboration. The main aim of this study includes bridging this gap by proposing a continuum-based team concept, describing the distinction between…

  6. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  7. When Teams Go Crazy

    DEFF Research Database (Denmark)

    Kuhrmann, Marco; Münch, Jürgen

    2016-01-01

    Software development consists to a large extend of human-based processes with continuously increasing demands regarding interdisciplinary team work. Understanding the dynamics of software teams can be seen as highly important to successful project execution. Hence, for future project managers......, knowledge about non-technical processes in teams is significant. In this paper, we present a course unit that provides an environment in which students can learn and experience the impact of group dynamics on project performance and quality. The course unit uses the Tuckman model as theoretical framework......, and borrows from controlled experiments to organize and implement its practical parts in which students then experience the effects of, e.g., time pressure, resource bottlenecks, staff turnover, loss of key personnel, and other stress factors. We provide a detailed design of the course unit to allow...

  8. NASA GISS Climate Change Research Initiative: A Multidisciplinary Vertical Team Model for Improving STEM Education by Using NASA's Unique Capabilities.

    Science.gov (United States)

    Pearce, M. D.

    2017-12-01

    CCRI is a year-long STEM education program designed to bring together teams of NASA scientists, graduate, undergraduate and high school interns and high school STEM educators to become immersed in NASA research focused on atmospheric and climate changes in the 21st century. GISS climate research combines analysis of global datasets with global models of atmospheric, land surface, and oceanic processes to study climate change on Earth and other planetary atmospheres as a useful tool in assessing our general understanding of climate change. CCRI interns conduct research, gain knowledge in assigned research discipline, develop and present scientific presentations summarizing their research experience. Specifically, CCRI interns write a scientific research paper explaining basic ideas, research protocols, abstract, results, conclusion and experimental design. Prepare and present a professional presentation of their research project at NASA GISS, prepare and present a scientific poster of their research project at local and national research symposiums along with other federal agencies. CCRI Educators lead research teams under the direction of a NASA GISS scientist, conduct research, develop research based learning units and assist NASA scientists with the mentoring of interns. Educators create an Applied Research STEM Curriculum Unit Portfolio based on their research experience integrating NASA unique resources, tools and content into a teacher developed unit plan aligned with the State and NGSS standards. STEM Educators also Integrate and implement NASA unique units and content into their STEM courses during academic year, perform community education STEM engagement events, mentor interns in writing a research paper, oral research reporting, power point design and scientific poster design for presentation to local and national audiences. The CCRI program contributes to the Federal STEM Co-STEM initiatives by providing opportunities, NASA education resources and

  9. Multivariate Analysis of Students Perception on Teaching with Client Based and Non-Client Based Team Projects

    Directory of Open Access Journals (Sweden)

    Philip Appiah-Kubi

    2018-05-01

    Full Text Available The classroom experience has evolved from traditional lecture, PowerPoint and whiteboards to a more active environment where students and instructors work together more on hands-on activities to achieve the course objectives. Various names have been given to this pedagogy; experiential learning, project-based learning, active learning, problem-based learning are a handful of names used to describe this evolving pedagogy. The main challenge faced by educators in educating undergraduate students to be independent thinkers and problem solvers, has been the driving force fueling the shift in pedagogy. The skill sets needed to be successful in the workforce has also evolved over the years. Today’s employees are not only expected to demonstrate proficiency in green skills in their field of study, but must also possess soft skills required to be competitive in the industry. Gone are the days where engineers worked in silos applying their green skills to create for the common good. To be productive, employers expect today’s engineer to demonstrate the ability to work in teams, communicate effectively, while applying the technical and analytical know-how needed to achieve a desired goal. To ensure that undergraduate students have these desired skills, most engineering educators have shifted away from the traditional all lecture classes and are applying active learning pedagogies. This research looks into student’s perception on project-based learning with client based and non-client based projects in terms of: the project as a learning device, contribution to research knowledge, motivation to learn, contribution to skills and personal benefits, and their effects on student evaluation of teaching and motivation to learn.

  10. Materials and Structures Research for Gas Turbine Applications Within the NASA Subsonic Fixed Wing Project

    Science.gov (United States)

    Hurst, Janet

    2011-01-01

    A brief overview is presented of the current materials and structures research geared toward propulsion applications for NASA s Subsonic Fixed Wing Project one of four projects within the Fundamental Aeronautics Program of the NASA Aeronautics Research Mission Directorate. The Subsonic Fixed Wing (SFW) Project has selected challenging goals which anticipate an increasing emphasis on aviation s impact upon the global issue of environmental responsibility. These goals are greatly reduced noise, reduced emissions and reduced fuel consumption and address 25 to 30 years of technology development. Successful implementation of these demanding goals will require development of new materials and structural approaches within gas turbine propulsion technology. The Materials and Structures discipline, within the SFW project, comprise cross-cutting technologies ranging from basic investigations to component validation in laboratory environments. Material advances are teamed with innovative designs in a multidisciplinary approach with the resulting technology advances directed to promote the goals of reduced noise and emissions along with improved performance.

  11. Team player styles, team design variables and team work effectiveness in Egypt

    OpenAIRE

    El-Kot, Ghada Awed Hassan

    2001-01-01

    The literature has revealed few studies of management in Arab countries in general and particularly in Egypt. Many Egyptian organisations implemented the team concept a number of years ago, however, there do not appear to be any studies investicitaýt inc",D team work effectiveness in Egypt. The literature review and the findings of a pilot study emphasised the need for empirical research in team work in Egypt. Team effectiveness models are examined in order to identify the fact...

  12. Get SMARTS] (Sports Medicine Research Team System): A Computerized Outpatient Data Collection System for Epidemiologic Research

    National Research Council Canada - National Science Library

    Brodine, S

    1997-01-01

    .... This report describes features of the Sports Medicine Research Team System (SMARTS) and reviews results of a SMARTS supported prospective study of male Marine Corps recruits undergoing basic training...

  13. Nuclear Nonproliferation Ontology Assessment Team Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strasburg, Jana D.; Hohimer, Ryan E.

    2012-01-01

    Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

  14. Experience as Knowledge in a New Product Development Team: Implications for Knowledge Management

    Science.gov (United States)

    Cooper, Lynne P.

    2009-01-01

    This study was conducted to better understand how New Product Development (NPD) team members apply their experiences to meet the task needs of their project. Although "experience" is highly valued in team members, little research has looked specifically at experiences as a type of knowledge, and how this knowledge is used in work settings. This research evaluated nearly 200 instances where team members referenced past experiences during team meetings. During these experience exchanges, team members structured the sharing of their experiences to include three common elements: the source of the experience, the nature of the experience, and the degree of relevance to the current work of the team. The experiences fell into four categories: people (relationships), process, product, and politics. This paper describes how team members structured, applied, and integrated their individual experiences and presents the resulting implications for knowledge management systems that wish to exploit experience knowledge.

  15. EMSODEV and EPOS-IP: key findings for effective management of EU research infrastructure projects

    Science.gov (United States)

    Materia, Paola; Bozzoli, Sabrina; Beranzoli, Laura; Cocco, Massimo; Favali, Paolo; Freda, Carmela; Sangianantoni, Agata

    2017-04-01

    EMSO (European Multidisciplinary Seafloor and water-column Observatory, http://www.emso-eu.org) and EPOS (European Plate Observing System, https://www.epos-ip.org) are pan-European Research Infrastructures (RIs) in the ESFRI 2016 Roadmap. EMSO has recently become an ERIC (European Research Infrastructure Consortium), whilst EPOS application is in progress. Both ERICs will be hosted in Italy and the "Representing Entity" is INGV. EMSO consists of oceanic environment observation systems spanning from the Arctic through the Atlantic and Mediterranean, to the Black Sea for long-term, high-resolution, real-time monitoring of natural and man-induced processes such as hazards, climate, and marine ecosystems changes to study their evolution and interconnections. EPOS aims at creating a pan-European infrastructure for solid Earth science to support a safe and sustainable society. EPOS will enable innovative multidisciplinary research for a better understanding of Earth's physical and chemical processes controlling earthquakes, volcanic eruptions, ground instability, tsunami, and all those processes driving tectonics and Earth's surface dynamics. Following the conclusion of their Preparatory Phases the two RIs are now in their Implementation Phase still supported by the EC through the EMSODEV and EPOS-IP projects, both run by dedicated Project Management Offices at INGV with sound experience in EU projects. EMSODEV (H2020 project, 2015-2018) involves 11 partners and 9 associate partners and aims at improving the harmonization among the EMSO ERIC observation systems through the realization of EMSO Generic Instrument Modules (EGIMs), and a Data Management Platform (DMP) to implement interoperability and standardization. The DMP will provide access to data from all EMSO nodes, providing a unified, homogeneous, infrastructure-scale and user-oriented platform integrated with the increased measurement capabilities and functions provided by the EGIMs. EPOS IP (H2020 project, 2015

  16. MD-11 PCA - Research flight team egress

    Science.gov (United States)

    1995-01-01

    This McDonnell Douglas MD-11 has parked on the flightline at NASA's Dryden Flight Research Center, Edwards, California, following its completion of the first and second landings ever performed by a transport aircraft under engine power only (on Aug. 29, 1995). The milestone flight, with NASA research pilot and former astronaut Gordon Fullerton at the controls, was part of a NASA project to develop a computer-assisted engine control system that enables a pilot to land a plane safely when its normal control surfaces are disabled. Coming down the steps from the aircraft are Gordon Fullerton (in front), followed by Bill Burcham, Propulsion Controlled Aircraft (PCA) project engineer at Dryden; NASA Dryden controls engineer John Burken; John Feather of McDonnell Douglas; and Drew Pappas, McDonnell Douglas' project manager for PCA.

  17. Improving motivation and engagement in core engineering courses with student teams

    Science.gov (United States)

    Trenshaw, Kathryn Faye

    Team-based projects are common in capstone engineering design courses and increasingly common in first-year engineering programs. Despite high enrollments and budget cutbacks affecting many programs, second- and third-year students can also benefit from team-based project experiences, which motivate them to succeed in engineering and prepare them for a globally competitive workforce. My dissertation research demonstrates that team design projects can be incorporated into the curricula of engineering departments, and these projects result in positive affective outcomes for students. Using ABET outcomes and Self Determination Theory (SDT) as the background for my studies, I investigated students' confidence, motivation, and sense of community after experiencing team design projects in two different engineering departments at a large public institution. In the first study, I used a sequential mixed methods approach with a primary quantitative phase followed by an explanatory qualitative phase to evaluate a chemical engineering program that integrated team design projects throughout the curriculum. The evaluation methods included a survey based on desired ABET outcomes for students and focus groups to expand on the quantitative results. Students reported increased confidence in their design, teamwork, and communication skills after completing the projects. In my second and third studies, I used qualitative interviews based on SDT to explore student motivation in an electrical and computer engineering course redesigned to support students' intrinsic motivation to learn. SDT states that intrinsic motivation to learn is supported by increasing students' sense of autonomy, competence, and relatedness in regard to their learning. Using both narrative inquiry and phenomenological methodologies, I analyzed data from interviews of students for mentions of autonomy, competence, and relatedness as well as course events that were critical in changing students' motivation

  18. The Undergraduate Student Instrument Project (USIP) - building the STEM workforce by providing exciting, multi-disciplinary, student-led suborbital flight projects.

    Science.gov (United States)

    Dingwall, B. J.

    2015-12-01

    NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that

  19. The Relationship between Management Team Size and Team Performance: The Mediating Effect of Team Psychological Safety

    OpenAIRE

    Midthaug, Mari Bratterud

    2017-01-01

    The purpose of this thesis is to explore the relationship between team size (number of team members) and team performance in management teams. There is a lack of empirical research exploring the potential links between these two elements within management teams. Further, little attention has been paid to potential mechanisms affecting this relationship. In this study, team psychological safety has been examined as a potential mediator in the size-performance relationship, hypothesizing that t...

  20. Experiences of multidisciplinary development team members during user-centered design of telecare products and services: a qualitative study.

    Science.gov (United States)

    Vermeulen, Joan; Verwey, Renée; Hochstenbach, Laura M J; van der Weegen, Sanne; Man, Yan Ping; de Witte, Luc P

    2014-05-19

    User-centered design (UCD) methodologies can help take the needs and requirements of potential end-users into account during the development of innovative telecare products and services. Understanding how members of multidisciplinary development teams experience the UCD process might help to gain insight into factors that members with different backgrounds consider critical during the development of telecare products and services. The primary objective of this study was to explore how members of multidisciplinary development teams experienced the UCD process of telecare products and services. The secondary objective was to identify differences and similarities in the barriers and facilitators they experienced. Twenty-five members of multidisciplinary development teams of four Research and Development (R&D) projects participated in this study. The R&D projects aimed to develop telecare products and services that can support self-management in elderly people or patients with chronic conditions. Seven participants were representatives of end-users (elderly persons or patients with chronic conditions), three were professional end-users (geriatrician and nurses), five were engineers, four were managers (of R&D companies or engineering teams), and six were researchers. All participants were interviewed by a researcher who was not part of their own development team. The following topics were discussed during the interviews: (1) aim of the project, (2) role of the participant, (3) experiences during the development process, (4) points of improvement, and (5) what the project meant to the participant. Experiences of participants related to the following themes: (1) creating a development team, (2) expectations regarding responsibilities and roles, (3) translating user requirements into technical requirements, (4) technical challenges, (5) evaluation of developed products and services, and (6) valorization. Multidisciplinary team members from different backgrounds often

  1. Virginia Tech team qualifies as DARPA Urban Challenge semi-finalist

    OpenAIRE

    Crumbley, Liz

    2007-01-01

    "VictorTango," a team of Virginia Tech engineering and geography students, will travel to Victorville, Calif., for the national qualifying rounds of the Urban Challenge autonomous vehicle competition, sponsored by the Defense Advanced Research Projects Agency (DARPA).

  2. Research Projects for Interrogations of Biological Systems: Training for the Development of Novel Radiotracers

    International Nuclear Information System (INIS)

    Jurisson, Silvia S.; Lever, Susan Z.; Robertson, J. David

    2016-01-01

    This grant was situated at the University of Missouri to train Ph.D. scientists in radiochemistry and synthetic chemistry in conjunction with Faculty from the Interdisciplinary Plant Group, Division of Biological Sciences, the MU Research Reactor Center, Molecular Biology and the Radiopharmaceutical Sciences Institute. This project was collaborative with Brookhaven National Laboratory (Richard Ferrieri, PI). Projects for the Ph.D. candidates included novel probe development for peptides, nucleosides, small molecules or radiometals, the direct use of radiometals as probes, or nuclear techniques for analysis. The projects for the postdoctoral fellow involved synthetic chemistry for the preparation of precursors for novel tracers that will be radiolabeled with "1"8F or other appropriate radionuclides. The skill sets of our team members allowed us to prepare probes with positron or single photon emitters, as well as ones that are dual-labeled (fluorescent and radiolabeled). We focused our technical advances to those that will be broadly applicable to any research field.

  3. Research Projects for Interrogations of Biological Systems: Training for the Development of Novel Radiotracers

    Energy Technology Data Exchange (ETDEWEB)

    Jurisson, Silvia S. [Univ. of Missouri, Columbia, MO (United States); Lever, Susan Z. [Univ. of Missouri, Columbia, MO (United States); Robertson, J. David [Univ. of Missouri, Columbia, MO (United States)

    2016-10-04

    This grant was situated at the University of Missouri to train Ph.D. scientists in radiochemistry and synthetic chemistry in conjunction with Faculty from the Interdisciplinary Plant Group, Division of Biological Sciences, the MU Research Reactor Center, Molecular Biology and the Radiopharmaceutical Sciences Institute. This project was collaborative with Brookhaven National Laboratory (Richard Ferrieri, PI). Projects for the Ph.D. candidates included novel probe development for peptides, nucleosides, small molecules or radiometals, the direct use of radiometals as probes, or nuclear techniques for analysis. The projects for the postdoctoral fellow involved synthetic chemistry for the preparation of precursors for novel tracers that will be radiolabeled with 18F or other appropriate radionuclides. The skill sets of our team members allowed us to prepare probes with positron or single photon emitters, as well as ones that are dual-labeled (fluorescent and radiolabeled). We focused our technical advances to those that will be broadly applicable to any research field.

  4. Uncovering Transdisciplinary Team Project Outcomes through Ripple Effect Mapping

    Science.gov (United States)

    Daniels, Catherine H.; Chalker-Scott, Linda; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary, geographically dispersed group of faculty and staff. As with many such teams, member retention requires effort, as busy individuals may not see the overall benefits of active team membership. Ripple effect mapping is a strategy that can illustrate the tangible and often…

  5. Canadian contribution to the European Union Home Team program for ITER

    International Nuclear Information System (INIS)

    Murdoch, D.K.; Blevins, J.D.; Gierszewski, P.; Matsugu, R.

    1998-01-01

    Canadian participation in R and D and design tasks for the ITER project is predominantly in the fuel cycle, remote handling and safety fields. These tasks are carried out in Canada by Ontario Hydro, research institutes, industry and universities. In addition, Canada provides the services of a number of specialist engineers and scientists in key positions at the three ITER work sites and in the European Home Team. The Canadian contribution, which is coordinated by the Canadian Fusion Fuels Technology Project (CFFTP), forms an integral part of the European Union Home Team program. The key components of the Canadian contribution are described. (author)

  6. Diversity and inequality in management teams : A review and integration of research on vertical and horizontal member differences

    NARCIS (Netherlands)

    Bunderson, J. Stuart; van der Vegt, Gerben S.

    The promise and perils of heterogeneity in team member characteristics has been and continues to be one of the central questions in research on management teams. We review the literature on member heterogeneity within management teams, with a focus on summarizing and integrating research on both

  7. Strengths, weaknesses, opportunities and threats of virtual team in Nigerian construction industry

    Directory of Open Access Journals (Sweden)

    Odubiyi Tawakalitu Bisola

    2016-12-01

    Full Text Available The rationale behind any construction project varies; it might be to achieve value, time, quality, cost or just satisfaction for the client. Irrespective of any or all of these reasons, the team members involved in conception, inception, construction and delivery of a project are aware that a good teamwork is of essence. This is in the context of growing needs of client and the ever-growing improvement in methods of project delivery as influenced by technology. This article looks into the team type in the Nigerian construction industry from the angle of a virtual team (VT using the mixed-method research design. VT is simply a type of team wherein the members operate from different geographical regions and function majorly with the aid of information and communications technology media. Data for the study were collected from relevant literature, interviews were conducted with 20 selected professionals in the construction industry and, thereafter, a questionnaire was drafted from the results of the interviews and administered to selected relevant professionals. The study revealed that communication among team members, flexibility of operation and decision making are usually the most influencing strengths of the VT, while some of its weaknesses are a need for special training, conflict among team members and client’s acceptance of team type. Reduction in time-to-market, collaboration ability of team members and delivery time of project were seen as opportunities, while recognized threats were members’ performance level and complexity of technical application. The study concludes that the success of the VT depends highly on exploiting the opportunities opened to it.

  8. National register of research projects

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    This Register is intended to serve as a source of information on research which is being conducted in all fields (both natural and human sciences) in the Republic of South Africa. New research projects commenced during 1983 or 1984, and significantly changed research projects, as well as project that were completed or terminated during this period, on which information was received by the compilers before December 1984, are included, with the exception of confidential projects.

  9. A Librarian by Any Other Name: The Role of the Informationist on a Clinical Research Team

    Directory of Open Access Journals (Sweden)

    Sally A. Gore

    2013-05-01

    Full Text Available In 2012, the Lamar Soutter Library (LSL, University of Massachusetts Medical School, successfully collaborated with two principal investigators at UMMS, as well as their research team, to receive a supplemental grant from the National Library of Medicine. The award, an “NLM Administrative Supplements for Informationist Services in NIH-funded Research Projects”, was one of eight awarded nationally. It provides funding to support an informationist, or in-context information specialist, who serves the research team by offering expertise in the areas of data and information management.For 18 months, the informationist is serving as a member of the research team on the grant, “Promoting Breast Cancer Screening in Non-Adherent Women” (R01 CA-132935, National Cancer Institute, National Institutes of Health, working to develop data management tools, providing an in-depth literature review and report on the issues facing researchers and internet technology professionals when building and implementing research tools, assisting with a systematic review on the effectiveness of telephone intervention protocols for preventive screenings, and instructing the members of the team in advanced searching techniques and bibliographic management.This role serves as a new model of embedded librarianship for the LSL. It also provides opportunities for new services from the Library in the role of data and information management. Further, the acceptance of an informationist into a well-funded research team demonstrates a level of commitment by researchers to receiving research support from the Library that it has not experienced to date. This brief paper describes the study and the accomplishments to date.

  10. Team Orientations, Interpersonal Relations, and Team Success

    Science.gov (United States)

    Nixon, Howard L.

    1976-01-01

    Contradictions in post research on the concepts of "cohesiveness" and team success seem to arise from the ways in which cohesiveness is measured and the nature of the teams investigated in each study. (MB)

  11. Solving challenges in inter- and trans-disciplinary working teams: Lessons from the surgical technology field.

    Science.gov (United States)

    Korb, Werner; Geißler, Norman; Strauß, Gero

    2015-03-01

    Engineering a medical technology is a complex process, therefore it is important to include experts from different scientific fields. This is particularly true for the development of surgical technology, where the relevant scientific fields are surgery (medicine) and engineering (electrical engineering, mechanical engineering, computer science, etc.). Furthermore, the scientific field of human factors is important to ensure that a surgical technology is indeed functional, process-oriented, effective, efficient as well as user- and patient-oriented. Working in such trans- and inter-disciplinary teams can be challenging due to different working cultures. The intention of this paper is to propose an innovative cooperative working culture for the interdisciplinary field of computer-assisted surgery (CAS) based on more than ten years of research on the one hand and the interdisciplinary literature on working cultures and various organizational theories on the other hand. In this paper, a retrospective analysis of more than ten years of research work in inter- and trans-disciplinary teams in the field of CAS will be performed. This analysis is based on the documented observations of the authors, the study reports, protocols, lab reports and published publications. To additionally evaluate the scientific experience in an interdisciplinary research team, a literature analysis regarding scientific literature on trans- and inter-disciplinarity was performed. Own research and literature analyses were compared. Both the literature and the scientific experience in an interdisciplinary research team show that consensus finding is not always easy. It is, however, important to start trans- and interdisciplinary projects with a shared mental model and common goals, which include communication and leadership issues within the project teams, i.e. clear and unambiguous information about the individual responsibilities and objectives to attain. This is made necessary due to differing

  12. Netball team members, but not hobby group members, distinguish team characteristics from group characteristics.

    Science.gov (United States)

    Stillman, Jennifer A; Fletcher, Richard B; Carr, Stuart C

    2007-04-01

    Research on groups is often applied to sport teams, and research on teams is often applied to groups. This study investigates the extent to which individuals have distinct schemas for groups and teams. A list of team and group characteristics was generated from 250 individuals, for use in this and related research. Questions about teams versus groups carry an a priori implication that differences exist; therefore, list items were presented to new participants and were analyzed using signal detection theory, which can accommodate a finding of no detectable difference between a nominated category and similar items. Participants were 30 members from each of the following: netball teams, the general public, and hobby groups. Analysis revealed few features that set groups apart from teams; however, teams were perceived as more structured and demanding, requiring commitment and effort toward shared goals. Team and group characteristics were more clearly defined to team members than they were to other participant groups. The research has implications for coaches and practitioners.

  13. The impact of friendship ties on new product development student projects

    DEFF Research Database (Denmark)

    Kylindri, Stamatia; Blanas, George; Tanev, Stoyan

    2013-01-01

    The competition between firms for more effective new product development (NPD) capabilities has posed the research question: what possibilities are there to improve traditional and knowledge based project team organisation by analysing the impact of social relationships between team members......? The authors of this article tested the hypothesis that friendships have a positive impact on project team effectiveness using the cohesion social network metric. The methodology involves a combination of qualitative and quantitative methodologies applicable to social network analysis (SNA) research...

  14. Research on Team-teaching in Mathematics Education

    OpenAIRE

    重松, 敬一; 井戸野, 佐知子; 勝美, 芳雄

    1995-01-01

    Recently, there are many classes in which at least two teachers teach mathematics in elementary and lower secondary schools. We call that kind of teaching team-teaching. In some countries, it is called co-operative teaching. In this paper, we investigate the concept of team-teaching in mathematics education implementing a questionnaire, interviews or observing classroom lessons. Today, team-teaching has been administratively systematized. For example, additive teachers are sent to local schoo...

  15. The Schizophrenia Patient Outcomes Research Team (PORT): updated treatment recommendations 2009.

    Science.gov (United States)

    Kreyenbuhl, Julie; Buchanan, Robert W; Dickerson, Faith B; Dixon, Lisa B

    2010-01-01

    The Schizophrenia Patient Outcomes Research Team (PORT) project has played a significant role in the development and dissemination of evidence-based practices for schizophrenia. In contrast to other clinical guidelines, the Schizophrenia PORT Treatment Recommendations, initially published in 1998 and first revised in 2003, are based primarily on empirical data. Over the last 5 years, research on psychopharmacologic and psychosocial treatments for schizophrenia has continued to evolve, warranting an update of the PORT recommendations. In consultation with expert advisors, 2 Evidence Review Groups (ERGs) identified 41 treatment areas for review and conducted electronic literature searches to identify all clinical studies published since the last PORT literature review. The ERGs also reviewed studies preceding 2002 in areas not covered by previous PORT reviews, including smoking cessation, substance abuse, and weight loss. The ERGs reviewed over 600 studies and synthesized the research evidence, producing recommendations for those treatments for which the evidence was sufficiently strong to merit recommendation status. For those treatments lacking empirical support, the ERGs produced parallel summary statements. An Expert Panel consisting of 39 schizophrenia researchers, clinicians, and consumers attended a conference in November 2008 in which consensus was reached on the state of the evidence for each of the treatment areas reviewed. The methods and outcomes of the update process are presented here and resulted in recommendations for 16 psychopharmacologic and 8 psychosocial treatments for schizophrenia. Another 13 psychopharmacologic and 4 psychosocial treatments had insufficient evidence to support a recommendation, representing significant unmet needs in important treatment domains.

  16. 2011 Joint Science Education Project: Research Experience in Polar Science

    Science.gov (United States)

    Wilkening, J.; Ader, V.

    2011-12-01

    The Joint Science Education Project (JSEP), sponsored by the National Science Foundation, is a two-part program that brings together students and teachers from the United States, Greenland, and Denmark, for a unique cross-cultural, first-hand experience of the realities of polar science field research in Greenland. During JSEP, students experienced research being conducted on and near the Greenland ice sheet by attending researcher presentations, visiting NSF-funded field sites (including Summit and NEEM field stations, both located on the Greenland ice sheet), and designing and conducting research projects in international teams. The results of two of these projects will be highlighted. The atmospheric project investigated the differences in CO2, UVA, UVB, temperature, and albedo in different Arctic microenvironments, while also examining the interaction between the atmosphere and water present in the given environments. It was found that the carbon dioxide levels varied: glacial environments having the lowest levels, with an average concentration of 272.500 ppm, and non-vegetated, terrestrial environments having the highest, with an average concentration of 395.143 ppm. Following up on these results, it is planned to further investigate the interaction of the water and atmosphere, including water's role in the uptake of carbon dioxide. The ecology project investigated the occurrence of unusual large blooms of Nostoc cyanobacteria in Kangerlussuaq area lakes. The water chemistry of the lakes which contained the cyanobacteria and the lakes that did not were compared. The only noticeable difference was of the lakes' acidity, lakes containing the blooms had an average pH value of 8.58, whereas lakes without the blooms had an average pH value of 6.60. Further investigation of these results is needed to determine whether or not this was a cause or effect of the cyanobacteria blooms. As a next step, it is planned to attempt to grow the blooms to monitor their effects on

  17. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  18. What makes age diverse teams effective? Results from a six-year research program.

    Science.gov (United States)

    Wegge, J; Jungmann, F; Liebermann, S; Shemla, M; Ries, B C; Diestel, S; Schmidt, K-H

    2012-01-01

    Based on a new model of productivity in age diverse tams, findings from a six-year research program are reported in which data from more than 745 natural teams with 8,848 employees in three different fields (car production, administrative work, financial services) were collected. Moreover, central assumptions of this model were tested with a representative survey of the German workforce (N = 2,000). Results support both significant advantages and disadvantages for age-mixed teams. Based on the findings, the following preconditions for the effectiveness of age diverse teams are identified: high task complexity, low salience and high appreciation of age diversity, a positive team climate, low age-discrimination, ergonomic design of work places, and the use of age differentiated leadership. Based on these insights, we developed a new training for supervisors, which addresses the aforementioned aspects and seeks to improve team performance and health of team members. It was found that the training reduces age stereotypes, team conflicts and enhances innovation. Thus, we can conclude that effective interventions for a successful integration of elderly employees in work groups are available and that combinations of measures that address ergonomic design issues, team composition and leadership are to be strongly recommended for practice.

  19. Embedded Librarian as Research Team Member.

    Science.gov (United States)

    Brahmi, Frances A; Kaplan, F Thomas D

    2017-03-01

    Adding a librarian to an upper extremity surgical and therapy practice has many advantages (educational, research, remaining on the cutting edge of technology). As an embedded team member, the librarian at the Indiana Hand to Shoulder Center prepares literature reviews, creates Google Scholar Alerts for individual clinicians, and introduces developing technologies such as 3-dimensional printers, Smartphone Apps, and online access to nontraditional resources. With the librarian relieving clinicians of these responsibilities, surgeons can devote more time to clinical and research activities. Private practices unable to support their own librarian could share access to a librarian via Skype, Face Time, and video conferencing. Another small practice alternative is contracting services from a local medical school library that designates a librarian as its liaison. Copyright © 2017 American Society for Surgery of the Hand. Published by Elsevier Inc. All rights reserved.

  20. Review: Christine von Blanckenburg, Birgit Böhm, Hans-Luidger Dienel & Heiner Legewie (2005. Leitfaden für interdisziplinäre Forschergruppen: Projekte initiieren – Zusammenarbeit gestalten [Guidelines for Interdisciplinary Research Teams: Initiating Projects—Developing Cooperation

    Directory of Open Access Journals (Sweden)

    Iris Rittenhofer

    2008-01-01

    Full Text Available Today, project-oriented work is an integral part of academic life. However, not all academics are ready to cope with this organizational aspect of scientific work or with the management of research teams. "Guidelines for Interdisciplinary Research Teams" provides a detailed outline of the various project stages, the potential conflicts and burgeoning power issues, as well as the basics and techniques of moderation. This volume offers excellent insight into the scientific enterprise and provides useful strategic options for managing teamwork. Thus, the volume is suitable for two purposes, namely as a set of guidelines for those inexperienced in scientific cooperation, and as a reference book for those who want to master their previous project experiences and utilize them in future enterprises. However, the intercultural aspect of scientific project organization is not discussed in the volume. URN: urn:nbn:de:0114-fqs0801179

  1. Student Research Projects

    Science.gov (United States)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  2. Diversity in goal orientation, team reflexivity, and team performance

    NARCIS (Netherlands)

    Pieterse, Anne Nederveen; van Knippenberg, Daan; van Ginkel, Wendy P.

    Although recent research highlights the role of team member goal orientation in team functioning, research has neglected the effects of diversity in goal orientation. In a laboratory study with groups working on a problem-solving task, we show that diversity in learning and performance orientation

  3. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  4. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  5. Microbial Murders Crime Scene Investigation: An Active Team-Based Learning Project that Enhances Student Enthusiasm and Comprehension of Clinical Microbial Pathogens.

    Science.gov (United States)

    Steel, J Jordan

    2017-01-01

    Microbial disease knowledge is a critical component of microbiology courses and is beneficial for many students' future careers. Microbiology courses traditionally cover core concepts through lectures and labs, but specific instruction on microbial diseases varies greatly depending on the instructor and course. A common project involves students researching and presenting a disease to the class. This method alone is not very effective, and course evaluations have consistently indicated that students felt they lacked adequate disease knowledge; therefore, a more hands-on and interactive disease project was developed called Microbial Murders. For this team-based project, a group of students chooses a pathogen, researches the disease, creates a "mugshot" of the pathogen, and develops a corresponding "crime scene," where a hypothetical patient has died from the microbe. Each group gives a presentation introducing the microbial pathogen, signs/symptoms, treatments, and overall characteristics. The students then visit each other's crime scenes to match the pathogen with the correct crime scene by critically thinking through the clues. This project has shown remarkable success. Surveys indicate that 73% of students thought the project helped them understand the material and 84% said it was worth their time. Student participation, excitement, understanding, and application of microbial disease knowledge have increased and are evident through an increase in course evaluations and in student assessment scores. This project is easy to implement and can be used in a wide variety of biology, microbiology, or health classes for any level (middle school through college).

  6. Experimental Plasma Research project summaries

    International Nuclear Information System (INIS)

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  7. Experimental Plasma Research project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report.

  8. Pioneering the Transdisciplinary Team Science Approach: Lessons Learned from National Cancer Institute Grantees.

    Science.gov (United States)

    Vogel, Amanda L; Stipelman, Brooke A; Hall, Kara L; Nebeling, Linda; Stokols, Daniel; Spruijt-Metz, Donna

    2014-01-01

    The National Cancer Institute has been a leader in supporting transdisciplinary (TD) team science. From 2005-2010, the NCI supported Transdisciplinary Research on Energetic and Cancer I (TREC I), a center initiative fostering the TD integration of social, behavioral, and biological sciences to examine the relationships among obesity, nutrition, physical activity and cancer. In the final year of TREC I, we conducted qualitative in-depth-interviews with 31 participating investigators and trainees to learn more about their experiences with TD team science, including challenges, facilitating factors, strategies for success, and impacts. Five main challenges emerged: (1) limited published guidance for how to engage in TD team science, when TREC I was implemented; (2) conceptual and scientific challenges inherent to efforts to achieve TD integration; (3) discipline-based differences in values, terminology, methods, and work styles; (4) project management challenges involved in TD team science; and (5) traditional incentive and reward systems that do not recognize or reward TD team science. Four main facilitating factors and strategies for success emerged: (1) beneficial attitudes and beliefs about TD research and team science; (2) effective team processes; (3) brokering and bridge-building activities by individuals holding particular roles in a research center; and (4) funding initiative characteristics that support TD team science. Broad impacts of participating in TD team science in the context of TREC I included: (1) new positive attitudes about TD research and team science; (2) new boundary-crossing collaborations; (3) scientific advances related to research approaches, findings, and dissemination; (4) institutional culture change and resource creation in support of TD team science; and (5) career advancement. Funding agencies, academic institutions, and scholarly journals can help to foster TD team science through funding opportunities, institutional policies on

  9. A Model of Framing in Design Teams

    Science.gov (United States)

    Zahedi, Mithra; Heaton, Lorna

    2017-01-01

    How do ideas evolve in the context of collaborative design? This research explores the framing strategies and tools involved in the co-construction of a shared understanding in the early stages of a design project. We observed a team of four industrial design students working to design a pop-up shop. We found that, while the key design elements of…

  10. Shared Authentic Leadership in Research Teams: Testing a Multiple Mediation Model

    NARCIS (Netherlands)

    Günter, Hannes; Gardner, William L.; Davis McCauley, Kelly; Randolph-Seng, Brandon; P. Prahbu, Veena

    2017-01-01

    Research teams face complex leadership and coordination challenges. We propose shared authentic leadership (SAL) as a timely approach to addressing these challenges. Drawing from authentic and functional leadership theories, we posit a multiple mediation model that suggests three mechanisms whereby

  11. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  12. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    Directory of Open Access Journals (Sweden)

    Jiaojie Han

    Full Text Available The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  13. Understanding the Effects of Team Cognition Associated with Complex Engineering Tasks: Dynamics of Shared Mental Models, Task-SMM, and Team-SMM

    Science.gov (United States)

    Lee, Miyoung; Johnson, Tristan E.

    2008-01-01

    This study investigates how shared mental models (SMMs) change over time in teams of students in a manufacturing engineering course. A complex ill-structured project was given to each team. The objective of the team project was to analyze, test, and propose ways to improve their given manufactured product. Shared mental models were measured in…

  14. A model for integrating clinical care and basic science research, and pitfalls of performing complex research projects for addressing a clinical challenge.

    Science.gov (United States)

    Steck, R; Epari, D R; Schuetz, M A

    2010-07-01

    The collaboration of clinicians with basic science researchers is crucial for addressing clinically relevant research questions. In order to initiate such mutually beneficial relationships, we propose a model where early career clinicians spend a designated time embedded in established basic science research groups, in order to pursue a postgraduate qualification. During this time, clinicians become integral members of the research team, fostering long term relationships and opening up opportunities for continuing collaboration. However, for these collaborations to be successful there are pitfalls to be avoided. Limited time and funding can lead to attempts to answer clinical challenges with highly complex research projects characterised by a large number of "clinical" factors being introduced in the hope that the research outcomes will be more clinically relevant. As a result, the complexity of such studies and variability of its outcomes may lead to difficulties in drawing scientifically justified and clinically useful conclusions. Consequently, we stress that it is the basic science researcher and the clinician's obligation to be mindful of the limitations and challenges of such multi-factorial research projects. A systematic step-by-step approach to address clinical research questions with limited, but highly targeted and well defined research projects provides the solid foundation which may lead to the development of a longer term research program for addressing more challenging clinical problems. Ultimately, we believe that it is such models, encouraging the vital collaboration between clinicians and researchers for the work on targeted, well defined research projects, which will result in answers to the important clinical challenges of today. Copyright (c) 2010 Elsevier Ltd. All rights reserved.

  15. Personality and community prevention teams: Dimensions of team leader and member personality predicting team functioning.

    Science.gov (United States)

    Feinberg, Mark E; Kim, Ji-Yeon; Greenberg, Mark T

    2008-11-01

    The predictors and correlates of positive functioning among community prevention teams have been examined in a number of research studies; however, the role of personality has been neglected. In this study, we examined whether team member and leader personality dimensions assessed at the time of team formation predicted local prevention team functioning 2.5-3.5 years later. Participants were 159 prevention team members in 14 communities participating in the PROSPER study of prevention program dissemination. Three aspects of personality, aggregated at the team level, were examined as predictors: Openness to Experience, Conscientiousness, and Agreeableness. A series of multivariate regression analyses were performed that accounted for the interdependency of five categories of team functioning. Results showed that average team member Openness was negatively, and Conscientiousness was positively linked to team functioning. The findings have implications for decisions about the level and nature of technical assistance support provided to community prevention teams.

  16. Intelligent marketing of electricity from decentral power sources. Project results of the research project ''Massig''; Intelligente Vermarktung von Strom aus dezentralen Energiequellen. Projektergebnisse des Forschungsvorhabens ''Massig''

    Energy Technology Data Exchange (ETDEWEB)

    Erge, Thomas; Sauer, Christian [Fraunhofer-Institut fuer Solare Energiesysteme ISE, Freiburg (Germany); Barnsteiner, Martin; Preiser, Klaus [Badenova Waermeplus GmbH und Co.KG, Freiburg (Germany)

    2011-07-01

    In the European research project 'Market Access for Smaller Size Intelligent Electricity Generation (Massig)' scientists at the Fraunhofer Institute for Solar Energy Systems (Freiburg, Federal Republic of Germany) examined together with project partners the demand-oriented supply and commercialization of electricity from decentral power generators at the liberalized electricity market. The project team selected target countries and evaluated innovative solutions of marketing especially for specific applications of practice. Such a model project is that of Badenova Waermeplus GmbH (Freiburg, Federal Republic of Germany).

  17. High School Students' Reasons for Their Science Dispositions: Community-Based Innovative Technology-Embedded Environmental Research Projects

    Science.gov (United States)

    Ebenezer, Jazlin; Kaya, Osman Nafiz; Kasab, Dimma

    2018-05-01

    The purpose of this investigation was to qualitatively describe high school students' reasons for their science dispositions (attitude, perception, and self-confidence) based on their long-term experience with innovative technology-embedded environmental research projects. Students in small groups conducted research projects in and out of school with the help of their teachers and community experts (scientists and engineers). During the 3-year period of this nationally funded project, a total of 135 students from five schools in a mid-west State participated in research activities. Of the 135 students, 53 students were individually interviewed to explore reasons for their science dispositions. Students' reasons for each disposition were grouped into categories, and corresponding frequency was converted to a percentage. The categories of reasons were not only attributed to the use of innovative technologies in environmental research but also the contexts and events that surrounded it. The reasons that influenced students' science dispositions positively were because engaging in environmental research projects with technology contributed to easing fear and difficulty, building a research team, disseminating findings, communicating with the community, researching with scientists, training by teachers, and acknowledging teachers' knowledge. These results advanced how and why students develop science dispositions in the positive direction, which are as follows: building science teacher capacity, developing a community of inquirers, and committing to improve pedagogical practices.

  18. Shared voices, different worlds: Process and product in the Food Dignity action research project

    Directory of Open Access Journals (Sweden)

    Christine M. Porter

    2014-06-01

    Full Text Available Diversity of perspective makes for greater depth when painting a portrait of community life. But embracing the idea of representing true diversity in a formal research project is a whole lot easier than putting it into practice. The three dozen members of the Food Dignity action research team, now entering the fourth year of a five-year project, are intimately familiar with this challenge. In this article, four of the collaborators explore the intricacies of navigating what it means to bring together a genuine cross-section of community-based activists and academics in an effort to draw on one another’s professional and personal strengths to collect and disseminate research findings that represent the truth of a community’s experiences, and are ultimately disseminated in a way that brings tangible benefit to the heart and soul of that community. The authors include Food Dignity’s principal investigator (Porter and three community organisers (Marshall, Herrera and Woodsum in organisations that have partnered with Food Dignity. Two of the organisers (Herrera and Woodsum also serve project-wide roles. These collaborators share their personal and professional hopes, struggles, concerns, successes and failures as participants in this cutting-edge effort to equalise community and university partnerships in research. Keywords: community-based participatory research (CBPR, food justice, equitable community-campus partnerships, food sovereignty, case study, action research

  19. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    Harris, K.J.

    1999-01-01

    the technical and contractual requirements of the project. A project manager with extensive experience in major defence projects has been contracted and a team of technical and contracts specialists has now completed documentation which has been issued as a Request for Tender to four pre-qualified reactor vendors. The four vendors were selected as a result of a worldwide invitation in mid 1998 for expressions of interest. The tender process is a 'two envelope' system whereby the tenderers are required to submit in one envelope the technical and contractual details of their bid whilst submitting the pricing details in the other envelope. Tenders close on 3 January 2000. A contract is expected to be agreed by mid 2000 with commissioning completed during 2005

  20. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1978-08-01

    This report contans descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Measurements and Instrumentation; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  1. STUK research projects 1998-2000

    International Nuclear Information System (INIS)

    Salomaa, S.; Eloranta, E.; Heimbuerger, H.; Jokela, K.; Jaervinen, H.

    1998-07-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation and promotes the supervision of nuclear safety. STUK research projects 1998 - 2000 summarizes STUK's own research projects and commissioned research designed to promote the supervision of nuclear safety. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. The work done on the safe use of nuclear power and nuclear waste management mainly comprises commissioned research projects which derive from the needs of authorities, and are funded and directed by STUK. This research is conducted by organizations outside STUK, but supervised by STUK experts. In some cases, STUK personnel are also involved. The goal of this research work is to produce the information needed for decision-making, to develop supervisory methods and to ensure that recent developments in science and technology are taken into account in action to promote safe use of nuclear power. STUK's own research focuses on radiation protection and the health effects of radiation. During 1998 - 2000, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. STUK's research activities are now more international than ever; the institute is involved in more then 20 research projects funded by EU. Apart from the EU and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (orig.)

  2. Youth, Team sports and Citizenship

    DEFF Research Database (Denmark)

    Ryom, Knud; Stelter, Reinhard

    of a team sports project as well as coaching and mentoring, the project goal was to challenge the boys to be part of a new shared and empowering community, so that they actively experienced the ability to take responsibility for themselves and others in the arenas where they lived. In close co......-operation with the local sports club ’Nørrebro United’, 26 volunteer coaches (coaching the boys in school), school staff, the local community and not least the young people themselves, the intervention gradually took it’s own form. The intention of this strong local co-operation, was to clarify the young participants...... bullet points. We will use voices from the project, like volunteer coaches and the local sports club Nørrebro United. This final discussion will broaden the local agenda of this research project towards a more general discussion with the participants....

  3. The Relationship Between Team Psychological Safety and Team Effectiveness in Management Teams: The Mediating Effect of Dialogue.

    OpenAIRE

    Bilstad, Julie Brat

    2016-01-01

    This study is a response to the research and request presented by Bang and Midelfart (2010), to further investigate the effect dialogue can have on management team s effectiveness. The purpose of the study was to investigate and explain the effect of team psychological safety on task performance and team member satisfaction, with dialogue as a mediator in this relationship. 215 Norwegian and Danish management teams in the private and public sector were studied. As expected, team psychological...

  4. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  5. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Science.gov (United States)

    Van Hooft, Edwin A. J.; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination. PMID:29674991

  6. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Directory of Open Access Journals (Sweden)

    Edwin A. J. Van Hooft

    2018-04-01

    Full Text Available Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  7. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    Science.gov (United States)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  8. The DREAMS Team: Creating Community Partnerships through Research Advocacy Training for Diverse Older Adults

    Science.gov (United States)

    Hart, Ariel R.; Dillard, Rebecca; Perkins, Molly M.; Vaughan, Camille P.; Kinlaw, Kathy; McKay, J. Lucas; Waldrop-Valverde, Drenna; Hagen, Kimberley; Wincek, Ron C.; Hackney, Madeleine E.

    2017-01-01

    The DREAMS Team research advocacy training program helps clinical faculty and health students introduce basic clinical research concepts to diverse older adults to galvanize their active involvement in the research process. Older adults are frequently underrepresented in clinical research, due to barriers to participation including distrust,…

  9. Team Leadership: Leadership Role Achievement in Supervision Teams in Turkey

    OpenAIRE

    Ali Sabanci; Izzet Ozdemir

    2015-01-01

    The purpose of this paper is to explore the views of team leaders and team members of supervision teams about the extent that team leaders achieve their team leadership roles in Turkey. This research was conducted as a survey. The population of the study consisted of approximately 2650 supervisors (inspectors) working in 81 provinces distributed to seven geographical regions in Turkey. The sample consisted of 563 supervisors which were selected out by random sampling. The data were gathered b...

  10. Coordinated research projects (CRP). Coordinated research project (CRP)

    International Nuclear Information System (INIS)

    Takagi, Hidekazu; Koike, Fumihiro; Nakamura, Nobuyuki

    2013-01-01

    In the present paper, the contribution of Japanese scientists in coordinated research projects on thermonuclear fusion. Representative subjects taken in seven projects are the precise computation of theoretical data on electron-molecule collisions in the peripheral plasma, the computation of spectroscopic data of multi-charged tungsten ions, the spectroscopic measurement of multi-charged tungsten ions using an ion trap device, the development of collisional-radiative model for plasmas including hydrogen and helium, the computational and theoretical studies on the behavior of tungsten and beryllium in the plasma-wall interaction, the study on the property of dusts generated in fusion devices. These subjects are those of most important issues in ITER. (author)

  11. Validation of Early Detection Ovarian Cancer Biomarkers (Team Project) — EDRN Public Portal

    Science.gov (United States)

    Early detection of Ovarian Cancer (OC) is one of the key clinical problems in this disease. We propose a team EDRN project to address the issue of early detection of OC by performing a validation study on candidate protein markers already identified in previous EDRN research or in the literature (e.g. protein products of TCGA identified mutations specific to ovarian cancer). (See appendix for full listing) Biospecimen sources have been identified which include samples obtained at diagnosis and matched controls (Urban, Godwin, Marks, Skates), and longitudinal samples obtained prior to diagnosis (Urban, Skates, Godwin). Bioinformatic filters will be applied to rank the candidates (Diamandis). In order of ranking, candidate proteins for which high quality antibodies are available will be measured by development of ELISAs at JHU (Chan/Zhang) or through NAPPA at DFCI (Anderson/LaBaer), while for other candidates mass spectrometry based selective reaction monitoring (SRM) assays will be developed at PNNL (Rodland). Three milestones are defined. The first two milestones are to assemble the necessary specimens and to develop the qualifying assay(s). The final milestone is to estimate the markers’ sensitivity one year prior to diagnosis at a given high specificity.

  12. Introducing a New Concept Inventory on Climate Change to Support Undergraduate Instruction, Teacher Education, Education Research, and Project Evaluation (Invited)

    Science.gov (United States)

    Morrow, C. A.; Monsaas, J.; Katzenberger, J.; Afolabi, C. Y.

    2013-12-01

    The Concept Inventory on Climate Change (CICC) is a new research-based, multiple-choice 'test' that provides a powerful new assessment tool for undergraduate instructors, teacher educators, education researchers, and project evaluators. This presentation will describe the features and the development process of the (CICC). This includes insights about how the development team (co-authors) integrated and augmented their multi-disciplinary expertise. The CICC has been developed in the context of a popular introductory undergraduate weather and climate course at a southeastern research university (N~400-500 per semester). The CICC is not a test for a grade, but is intended to be a useful measure of how well a given teaching and learning experience has succeeded in improving understanding about climate change and related climate concepts. The science content addressed by the CICC is rooted in the national consensus document, 'Climate Literacy: The Essential Principles of Climate Science'. The CICC has been designed to support undergraduate instruction, and may be valuable in comparable contexts that teach about climate change. CICC results can help to inform decisions about the effectiveness of teaching strategies by 1) flagging conceptual issues (PRE-instruction); and 2) detecting conceptual change (POST-instruction). Specific CICC items and their answer choices are informed by the research literature on common misunderstandings about climate and climate change. Each CICC item is rated on a 3-tier scale of the cognitive sophistication the item is calling for, and there is a balance among all three tiers across the full instrument. The CICC development process has involved data-driven changes to successive versions. Data sources have included item statistics from the administration of progressively evolved versions of the CICC in the weather and climate course, group interviews with students, and expert review by climate scientists, educators, and project evaluators

  13. Development of a Customizable Programme for Improving Interprofessional Team Meetings: An Action Research Approach.

    Science.gov (United States)

    van Dongen, Jerôme Jean Jacques; van Bokhoven, Marloes Amantia; Goossens, Wilhelmus Nicolaas Marie; Daniëls, Ramon; van der Weijden, Trudy; Beurskens, Anna

    2018-01-25

    Interprofessional teamwork is increasingly necessary in primary care to meet the needs of people with complex care demands. Needs assessment shows that this requires efficient interprofessional team meetings, focusing on patients' personal goals. The aim of this study was to develop a programme to improve the efficiency and patient-centredness of such meetings. Action research approach: a first draft of the programme was developed, and iteratively used and evaluated by three primary care teams. Data were collected using observations, interviews and a focus group, and analysed using directed content analysis. The final programme comprises a framework to reflect on team functioning, and training activities supplemented by a toolbox. Training is intended for the chairperson and a co-chair, and aims at organizing and structuring meetings, and enhancing patient-centredness. Our findings emphasize the essential role of the team's chairperson, who, in addition to technically structuring meetings, should act as a change agent guiding team development. Findings show that the programme should be customizable to each individual team's context and participants' learning objectives. Becoming acquainted with new structures can be considered a growth process, in which teams have to find their way, with the chairperson as change agent.

  14. Supply chain partnership in construction a field study on project team level factors

    NARCIS (Netherlands)

    Koolwijk, J.S.J.; Van Oel, C.J.; Wamelink, J.W.F.

    2015-01-01

    People and their relationship are at the heart of supply chain partnerships, however there is a lack of qualitative studies focusing on how integrated relationships may be developed. Therefore, the purpose of this study was to conduct field research to deepen our understanding of team level

  15. Solar Market Research and Analysis Projects | Solar Research | NREL

    Science.gov (United States)

    Market Research and Analysis Projects Solar Market Research and Analysis Projects Solar market research and analysis efforts at NREL seek to further solar technologies' role in supporting a more . Midscale Commercial Market Solar Analysis NREL experts are providing analysis to expand the midscale solar

  16. Resilient behaviour in innovation teams for better project results

    NARCIS (Netherlands)

    Oeij, P.R.A.

    2017-01-01

    Extenden abstract. Organising in a mindful way is a central aspect to making innovation teams become more resilient and enahnce their chances of innovation success. Such organising, called mindful infrastructure, implies creating the right conditions for teams to excel. Four elements are crucial to

  17. The Cosmic Ray Observatory Project: Results of a Summer High-School Student, Teacher, University Scientist Partnership Using a Capstone Research Experience

    Science.gov (United States)

    Shell, Duane F.; Snow, Gregory R.; Claes, Daniel R.

    2011-01-01

    This paper reports results from evaluation of the Cosmic Ray Observatory Project (CROP), a student, teacher, scientist partnership to engage high-school students and teachers in school based cosmic ray research. Specifically, this study examined whether an intensive summer workshop experience could effectively prepare teacher-student teams to…

  18. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  19. A Measure of Team Resilience: Developing the Resilience at Work Team Scale.

    Science.gov (United States)

    McEwen, Kathryn; Boyd, Carolyn M

    2018-03-01

    This study develops, and initial evaluates, a new measure of team-based resilience for use in research and practice. We conducted preliminary analyses, based on a cross-sectional sample of 344 employees nested within 31 teams. Seven dimensions were identified through exploratory and confirmatory factor analyses. The measure had high reliability and significant discrimination to indicate the presence of a unique team-based aspect of resilience that contributed to higher work engagement and higher self-rated team performance, over and above the effects of individual resilience. Multilevel analyses showed that team, but not individual, resilience predicted self-rated team performance. Practice implications include a need to focus on collective as well as individual behaviors in resilience-building. The measure provides a diagnostic instrument for teams and a scale to evaluate organizational interventions and research the relationship of resilience to other constructs.

  20. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  1. Experiences from a pilot study on how to conduct a qualitative multi-country research project regarding use of antibiotics in Southeast Europe

    DEFF Research Database (Denmark)

    Kaae, Susanne; Sporrong, Sofia Kälvemark; Traulsen, Janine Morgall

    2016-01-01

    regarding how to conduct these types of research projects by evaluating a pilot study of the project. METHODS: Local data collectors conducted the study according to a developed protocol and evaluated the study with the responsible researcher-team from University of Copenhagen. The pilot study focused......BACKGROUND: In 2014, a qualitative multi-country research project was launched to study the reasons behind the high use of antibiotics in regions of Southeast Europe by using previously untrained national interviewers (who were engaged in other antibiotic microbial resistance-related investigations......) to conduct qualitative interviews with local patients, physicians and pharmacists. Little knowledge exists about how to implement qualitative multi-country research collaborations involving previously untrained local data collectors. The aim of this paper was therefore to contribute to the knowledge...

  2. Enhanced Training for Cyber Situational Awareness in Red versus Blue Team Exercises

    Energy Technology Data Exchange (ETDEWEB)

    Carbajal, Armida J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Human Factors and Statistics; Stevens-Adams, Susan Marie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Risk and Reliability Analysis; Silva, Austin Ray [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Cognitive Modeling; Nauer, Kevin S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Cyber Security Technologies; Anderson, Benjamin Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Assurance Technologies and Assessment; Forsythe, James Chris [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Cognitive Modeling

    2012-09-01

    This report summarizes research conducted through the Sandia National Laboratories Enhanced Training for Cyber Situational Awareness in Red Versus Blue Team Exercises Laboratory Directed Research and Development project. The objective of this project was to advance scientific understanding concerning how to best structure training for cyber defenders. Two modes of training were considered. The baseline training condition (Tool-Based training) was based on current practices where classroom instruction focuses on the functions of a software tool with various exercises in which students apply those functions. In the second training condition (Narrative-Based training), classroom instruction addressed software functions, but in the context of adversary tactics and techniques. It was hypothesized that students receiving narrative-based training would gain a deeper conceptual understanding of the software tools and this would be reflected in better performance within a red versus blue team exercise.

  3. The Sellafield repository project information programme

    Energy Technology Data Exchange (ETDEWEB)

    Curd, P J [United Kingdom Nirex Limited (United Kingdom)

    1993-07-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  4. The Sellafield repository project information programme

    International Nuclear Information System (INIS)

    Curd, P.J.

    1993-01-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  5. Ontario pharmacists practicing in family health teams and the patient-centered medical home.

    Science.gov (United States)

    Dolovich, Lisa

    2012-04-01

    The patient-centered medical home (PCMH) approach continues to gather momentum in the United States and Canada as a broad approach to reform the delivery of the complete primary care system. The family health team (FHT) model implemented in Ontario, Canada, best mirrors the PCMH approach of the United States. The integration of pharmacists as key members of the health care team providing on-site, in-office coordinated care to FHT patients was included from the start of planning the FHT model and represents a substantial opportunity for pharmacists to realize their professional vision. Several research projects in Canada and elsewhere have contributed to providing evidence to support the integration of pharmacists into primary care practice sites. Two major research programs, the Seniors Medication Assessment Research Trial (SMART) cluster randomized controlled trial and the Integrating Family Medicine and Pharmacy to Advance Primary Care Therapeutics (IMPACT) multipronged demonstration project made substantial contributions to evidence-informed policy decisions supporting the integration of pharmacists into FHTs. These projects can provide useful information to support the integration of pharmacists into the PCMH and to encourage further research to better measure the effect of the pharmacist from the holistic patient-centered perspective.

  6. Automated Solar Cell Assembly Teamed Process Research. Final subcontract report, 6 January 1993--31 October 1995

    Energy Technology Data Exchange (ETDEWEB)

    Nowlan, M. J.; Hogan, S. J.; Breen, W. F.; Murach, J. M.; Sutherland, S. F.; Patterson, J. S.; Darkazalli, G. [Spire Corp., Bedford, MA (US)

    1996-02-01

    This is the Final Technical Report for a program entitled ''Automated Solar Cell Assembly Teamed Process Research,'' funded by the US Department of Energy. This program was part of Phase 3A of the Photovoltaic Manufacturing Technology (PVMaT) project, which addressed the generic needs of the photovoltaic (PV) industry for improved quality, accelerated production scale-up, and substantially reduced manufacturing cost. Crystalline silicon solar cells (Czochralski monocrystalline, cast polycrystalline, and ribbon polycrystalline) are used in the great majority of PV modules produced in the US, accounting for 95% of all shipments in 1994. Spire's goal in this program was to reduce the cost of these modules by developing high throughput (5 MW per year) automated processes for interconnecting solar cells made from standard and thin silicon wafers. Spire achieved this goal by developing a completely new automated processing system, designated the SPI-ASSEMBLER{trademark} 5000, which is now offered as a commercial product to the PV industry. A discussion of the project and of the Assembler is provided.

  7. Team Scaffolds: How Minimal Team Structures Enable Role-based Coordination

    OpenAIRE

    Valentine, Melissa A

    2013-01-01

    In this dissertation, I integrate research on role-based coordination with concepts adapted from the team effectiveness literature to theorize how minimal team structures support effective coordination when people do not work together regularly. I argue that role-based coordination among relative strangers can be interpersonally challenging and propose that team scaffolds (minimal team structures that bound groups of roles rather than groups of individuals) may provide occupants with a tempor...

  8. A pleasure working together? : the effects of dissimilarity in team member conscientiousness on team temporal processes and individual satisfaction

    NARCIS (Netherlands)

    Gevers, J.M.P.; Peeters, M.A.G.

    2009-01-01

    In this study of 43 student project teams, we tested a multi-level mediation model of the relationship between dissimilarity in conscientiousness, team temporal processes, and team member satisfaction. We distinguished between individual-level dissimilarity in conscientiousness (i.e., the distance

  9. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  10. Impacts of dairy diagnostic teams on herd performance.

    Science.gov (United States)

    Weinand, D; Conlin, B J

    2003-05-01

    This study evaluated impacts of educational diagnostic teams of consultants used to transfer technology to dairy farms. Herd management performance changes were measured by comparing Dairy Herd Improvement data from 38 project farms to data from herds that were geographical contemporaries. The value of focused goals for effecting change was also assessed. Interviews provided producers' perception of project outcomes and insight on organization and conduct of dairy diagnostic teams. Changes observed in project herds were small compared with controls with tendencies for increased herd size and improved milk production per cow. Focused goals had greater impacts on increasing herd size, milk per cow, first lactation peak milk, reducing age at first calving, and percentages of cows with subclinical mastitis. Time, money, facility limitations, labor, and alternative priorities were the most cited constraints to implementing changes. Satisfaction scores of producers were significantly related to the degree that team recommendations were followed. Improved attitudes, quality of life, and financial well-being were benefits listed by a majority of producers from participation in the project. If similar projects were to be offered, 83% said they would participate again, and 69% indicated they would pay at least some of the costs. Project farms served as demonstration farms for 1930 other producers in their respective locales, resulting in a multiplier effect of original advice given by consultant teams. Suggestions by farmer participants for improvements in dairy diagnostic teams included needs for at least some unbiased team members, more frequent meetings, more follow-up on recommendations, and consistency of recommendations with family goals.

  11. Biomedical engineering education through global engineering teams.

    Science.gov (United States)

    Scheffer, C; Blanckenberg, M; Garth-Davis, B; Eisenberg, M

    2012-01-01

    Most industrial projects require a team of engineers from a variety of disciplines. The team members are often culturally diverse and geographically dispersed. Many students do not acquire sufficient skills from typical university courses to function efficiently in such an environment. The Global Engineering Teams (GET) programme was designed to prepare students such a scenario in industry. This paper discusses five biomedical engineering themed projects completed by GET students. The benefits and success of the programme in educating students in the field of biomedical engineering are discussed.

  12. The relationship between servant leadership, affective team commitment and team effectiveness

    Directory of Open Access Journals (Sweden)

    Bright Mahembe

    2013-04-01

    Full Text Available Orientation: Value-based leadership practices play a critical role in teamwork in high-performance organisations.Research purpose: The aim of the study was to empirically validate a theoretical model explicating the structural relationships between servant leadership, affective team commitment and team effectiveness.Motivation for the study: The increased eliance on teams for production calls for an analysis of the role of follower-focused leadership practices in enhancing eam effectiveness.Research design, approach and method: A non-probabilityand multicultural sample consisting of 202 primary and secondary school teachers was drawn from 32 chools in the Western Cape Province of South Africa.Main findings: High levels of reliability were found and uni-dimensionality of the subscales was demonstrated through exploratory factor analyses. Good fit with the data was found for the measurement models through confirmatory factor analyses. Structural equation modelling showed a reasonable fit for the structural model. Positive relationships were found amongst servant leadership, team effectiveness and affective team commitment. Standard multiple regression analysis showed that affective team commitment moderated the relationship between servant leadership and team effectiveness.Practical/managerial implications: The findings emphasise the central role played by servant leadership and affective team commitment in team performance. Servant leadership fosters team effectiveness if employees feel committed to their work team.Contribution/value-add: The servant leadership style alone may not be a sufficient condition for team effectiveness; other variables, such as affective team commitment, also play a role. The study suggested specific variables that may also combine with leadership to positively influence team effectiveness.

  13. Process, practice and priorities — key lessons learnt undertaking sensitive social reconnaissance research as part of an (UNESCO-IOC) International Tsunami Survey Team

    Science.gov (United States)

    van Zijll de Jong, Shona L.; Dominey-Howes, Dale; Roman, Carolina E.; Calgaro, Emma; Gero, Anna; Veland, Siri; Bird, Deanne K.; Muliaina, Tolu; Tuiloma-Sua, Dawn; Afioga, Taulagi Latu

    2011-07-01

    The 29 September 2009 South Pacific tsunami has had a lasting impact upon local coastal villages and global collaborative research efforts. Locally, the impact of the tsunami is one of the most severe disasters Samoa has experienced in the last several decades. Within one week of the event, 143 people died. Approximately 6000 traumatized men, women and children - terrified of the sea - refused to return to live or work in their rural, coastal villages, which in turn has had broad consequences for humanitarian emergency relief distribution networks and early recovery planning efforts. Researchers came from all over the world to participate in the UNESCO International Oceanographic Commission (IOC) Samoa International Tsunami Survey Team (ITST). Focusing on the need for interdisciplinary research, for the first time, a social impact assessment team (SIT) was expressly invited to participate. Within days of the tsunami, a group of Australian, New Zealand, American, Fijian, and Japanese disaster researchers began to discuss how they might develop a social science reconnaissance research plan using innovative approaches and best practice. This paper presents an overview of challenges faced by the social impact assessment team with a focus on lessons to be learnt from this experience. We discuss the need to clarify project boundaries, develop a core research agenda and project milestones, and develop day-to-day fieldwork work plans and at the same time be sensitive to the emotional needs of the interviewees as well as the researchers. We also make several practical suggestions for future social reconnaissance research with a set of recommendations to support disaster researchers as they plan their own research projects. The inclusion of a social impacts assessment group within a UNESCO-IOC ITST was a valuable response to the increasing need for responsible social research in sensitive topics of post-disaster analysis. Social scientists are aware that disaster social

  14. Euro-led research team creates first ever reaction between matter and antimatter

    CERN Multimedia

    2006-01-01

    "An EU-funded team of international researchers has produced the first ever reaction between matter and antimatter, creating protonium. Protonium is a unique type of atom that consists of a proton and an antiproton orbiting around each other." (1 page)

  15. Learning to work together - lessons from a reflective analysis of a research project on public involvement.

    Science.gov (United States)

    Howe, A; Mathie, E; Munday, D; Cowe, M; Goodman, C; Keenan, J; Kendall, S; Poland, F; Staniszewska, S; Wilson, P

    2017-01-01

    Patient and public involvement (PPI) in research is very important, and funders and the NHS all expect this to happen. What this means in practice, and how to make it really successful, is therefore an important research question. This article analyses the experience of a research team using PPI, and makes recommendations on strengthening PPI in research. There were different PPI roles in our study - some people were part of the research team: some were on the advisory group; and there were patient groups who gave specific feedback on how to make research work better for their needs. We used minutes, other written documents, and structured individual and group reflections to learn from our own experiences over time. The main findings were:- for researchers and those in a PPI role to work in partnership, project structures must allow flexibility and responsiveness to different people's ideas and needs; a named link person can ensure support; PPI representatives need to feel fully included in the research; make clear what is expected for all roles; and ensure enough time and funding to allow meaningful involvement. Some roles brought more demands but also more rewards than others - highlighting that it is important that people giving up their time to help with research experience gains from doing so. Those contributing to PPI on a regular basis may want to learn new skills, rather than always doing the same things. Researchers and the public need to find ways to develop roles in PPI over time. We also found that, even for a team with expertise in PPI, there was a need both for understanding of different ways to contribute, and an evolving 'normalisation' of new ways of working together over time, which both enriched the process and the outputs. Background Patient and public involvement (PPI) is now an expectation of research funders, in the UK, but there is relatively little published literature on what this means in practice - nor is there much evaluative research

  16. Change champions at the grassroots level: practice innovation using team process.

    Science.gov (United States)

    Scott, J; Rantz, M

    1994-01-01

    A nursing administrative group recognized the critical value of staff participation in the formulation of a restructuring project and guidance throughout the project. Using a team approach, a task force of three staff nurses, two assistant nurse managers, a nurse clinician, a nursing practice specialist, and a representative from nursing administration came together. They were given responsibility for researching and setting the course for restructuring change. A unit-based team including a unit secretary, a nursing attendant, licensed practical nurse (LPN), and six staff nurses was formed from volunteers from the 40-bed medicine unit to develop that unit's plan for restructuring. The unit-based team analyzed patient care needs and staff member roles. They created a new patient care technician role as well as a nurse care coordinator role. The role of the LPN was envisioned as providing technical support. Staffing mix was also determined by the unit-based team. Both the task force and the unit-based team continue to evaluate, troubleshoot, and take every opportunity to sell their vision to solidify it further as the foundation for the future of patient care services at the hospital. The process will soon move forward to a large surgical unit.

  17. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  18. The Contribution of Graduation Research to School Development: Graduation Research as a Boundary Practice

    Science.gov (United States)

    Snoek, Marco; Bekebrede, Judith; Hanna, Fadie; Creton, Theun; Edzes, Hester

    2017-01-01

    When teaching is considered as a collaborative activity, the aim of research projects in schools needs to exceed the individual and personal levels and aim to contribute to research-informed reflection of a team of teachers. Within this multiple case study, we adapted the graduation research project within a primary teacher education programme,…

  19. TEAM-UP PV-friendly pricing projects: Validation of market research and market development

    International Nuclear Information System (INIS)

    Bigger, J.E.; Hester, S.L.

    1997-01-01

    More than two dozen electric utilities in the US have initiated renewable energy programs funded in total or in part by customers willing to pay a premium to either have their utility develop and use renewable technologies or have part of their own electric service needs supplied by renewable energy sources. These programs are beginning to answer key questions regarding the numbers and characteristics of customers that are willing to pay these premiums for clean, nonpolluting energy. Also, economic viability, level of revenue support, and other questions are critical to successful programs. This paper provides information on a number of utility efforts now underway which use photovoltaic (PV) systems and are part of the government-utility industry TEAM-UP program; it will also provide some early findings and perspectives that are coming from these utility efforts around the US

  20. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  1. Engaging with Community Advisory Boards (CABs) in Lusaka Zambia: perspectives from the research team and CAB members.

    Science.gov (United States)

    Mwinga, Alwyn; Moodley, Keymanthri

    2015-06-03

    The use of a Community Advisory Board (CAB) is one method of ensuring community engagement in community based research. To identify the process used to constitute CABs in Zambia, this paper draws on the perspectives of both research team members and CAB members from research groups who used CABs in Lusaka. Enabling and restricting factors impacting on the functioning of the CAB were identified. All studies approved by the University of Zambia Bioethics Research Committee (UBNZABREC) from 2008 - 2012 were reviewed to identify those studies that were likely to include a CAB. Eight teams with studies that included a CAB were identified. For each of these studies, consent was obtained to conduct an informal interview with a research team member and to obtain contact details for one CAB member. In total 14 interviews were conducted with 8 research team members and 6 CAB members from 12-30 August 2013. Identification of potential CAB members from the community and their participation in developing the terms of reference for CABs was perceived to have contributed to the success of the CAB. Due to the trust that the community had in members of their community the CABs were then in a stronger position to influence community participation in the research. Training of CAB members was identified as a factor that enhanced the functioning of a CAB. Lack of commitment and low literacy levels of CAB members posed a threat to the role of the CAB. Although compensation in the form of a stipend was not provided, CAB members were provided with transport reimbursements for attending meetings. Selection of CAB members from within the community contributed to community confidence in the CAB, enhancing its ability to act as an effective link between study team and community. This contributed positively to the conduct of the study and enhanced community awareness and acceptance of the research. However, establishment of study specific CABs has the potential to compromise CAB independence

  2. [Investigation of team processes that enhance team performance in business organization].

    Science.gov (United States)

    Nawata, Kengo; Yamaguchi, Hiroyuki; Hatano, Toru; Aoshima, Mika

    2015-02-01

    Many researchers have suggested team processes that enhance team performance. However, past team process models were based on crew team, whose all team members perform an indivisible temporary task. These models may be inapplicable business teams, whose individual members perform middle- and long-term tasks assigned to individual members. This study modified the teamwork model of Dickinson and McIntyre (1997) and aimed to demonstrate a whole team process that enhances the performance of business teams. We surveyed five companies (member N = 1,400, team N = 161) and investigated team-level-processes. Results showed that there were two sides of team processes: "communication" and "collaboration to achieve a goal." Team processes in which communication enhanced collaboration improved team performance with regard to all aspects of the quantitative objective index (e.g., current income and number of sales), supervisor rating, and self-rating measurements. On the basis of these results, we discuss the entire process by which teamwork enhances team performance in business organizations.

  3. Surgery and Research: A Practical Approach to Managing the Research Process

    Science.gov (United States)

    Swiatek, Peter R.; Chung, Kevin C.; Mahmoudi, Elham

    2016-01-01

    Following a practical project management method is essential in completing a research project on time and within budget. Although this concept is well developed in the business world, it has yet to be explored in academic surgical research. Defining and adhering to a suitable workflow would increase portability, reusability, and therefore, efficiency of the research process. In this article, we briefly review project management techniques. We specifically underline four main steps of project management: (1) definition and organization, (2) planning, (3) execution, and (4) evaluation, using practical examples from our own multidisciplinary plastic surgery research team. PMID:26710037

  4. AmeriFlux Measurement Network: Science Team Research

    Energy Technology Data Exchange (ETDEWEB)

    Law, B E

    2012-12-12

    Research involves analysis and field direction of AmeriFlux operations, and the PI provides scientific leadership of the AmeriFlux network. Activities include the coordination and quality assurance of measurements across AmeriFlux network sites, synthesis of results across the network, organizing and supporting the annual Science Team Meeting, and communicating AmeriFlux results to the scientific community and other users. Objectives of measurement research include (i) coordination of flux and biometric measurement protocols (ii) timely data delivery to the Carbon Dioxide Information and Analysis Center (CDIAC); and (iii) assurance of data quality of flux and ecosystem measurements contributed by AmeriFlux sites. Objectives of integration and synthesis activities include (i) integration of site data into network-wide synthesis products; and (ii) participation in the analysis, modeling and interpretation of network data products. Communications objectives include (i) organizing an annual meeting of AmeriFlux investigators for reporting annual flux measurements and exchanging scientific information on ecosystem carbon budgets; (ii) developing focused topics for analysis and publication; and (iii) developing data reporting protocols in support of AmeriFlux network goals.

  5. Research projects of STUK 2000-2002

    International Nuclear Information System (INIS)

    Salomaa, S.

    2000-06-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2000 - 2002 summarises STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and the health effects of radiation. During 2000 - 2002, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research activities are now more international than ever; the institute is involved in about 20 research projects funded by EC. Apart from the European Union and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (author)

  6. Improving Engineering Student Team Collaborative Discussions by Moving Them Online: An Investigation of Synchronous Chat and Face-to-Face Team Conversations

    Science.gov (United States)

    Fowler, Robin Revette

    2014-01-01

    Collaborative learning, particularly in the context of team-based, project-based learning, is common in undergraduate engineering education and is associated with deeper learning and enhanced student motivation and retention. However, grouping students in teams for project-based learning sometimes has negative outcomes, which can include lowered…

  7. Ethics in Community-University-Artist Partnered Research: Tensions, Contradictions and Gaps Identified in an 'Arts for Social Change' Project.

    Science.gov (United States)

    Yassi, Annalee; Spiegel, Jennifer Beth; Lockhart, Karen; Fels, Lynn; Boydell, Katherine; Marcuse, Judith

    Academics from diverse disciplines are recognizing not only the procedural ethical issues involved in research, but also the complexity of everyday "micro" ethical issues that arise. While ethical guidelines are being developed for research in aboriginal populations and low-and-middle-income countries, multi-partnered research initiatives examining arts-based interventions to promote social change pose a unique set of ethical dilemmas not yet fully explored. Our research team, comprising health, education, and social scientists, critical theorists, artists and community-activists launched a five-year research partnership on arts-for-social change. Funded by the Social Science and Humanities Research Council in Canada and based in six universities, including over 40 community-based collaborators, and informed by five main field projects (circus with street youth, theatre by people with disabilities, dance for people with Parkinson's disease, participatory theatre with refugees and artsinfused dialogue), we set out to synthesize existing knowledge and lessons we learned. We summarized these learnings into 12 key points for reflection, grouped into three categories: community-university partnership concerns ( n  = 3), dilemmas related to the arts ( n  = 5), and team issues ( n  = 4). In addition to addressing previous concerns outlined in the literature (e.g., related to consent, anonymity, dangerous emotional terrain, etc.), we identified power dynamics (visible and hidden) hindering meaningful participation of community partners and university-based teams that need to be addressed within a reflective critical framework of ethical practice. We present how our team has been addressing these issues, as examples of how such concerns could be approached in community-university partnerships in arts for social change.

  8. The relationship between servant leadership, affective team commitment and team effectiveness

    Directory of Open Access Journals (Sweden)

    Bright Mahembe

    2013-04-01

    Full Text Available Orientation: Value-based leadership practices play a critical role in teamwork in high-performance organisations. Research purpose: The aim of the study was to empirically validate a theoretical model explicating the structural relationships between servant leadership, affective team commitment and team effectiveness. Motivation for the study: The increased eliance on teams for production calls for an analysis of the role of follower-focused leadership practices in enhancing eam effectiveness. Research design, approach and method: A non-probabilityand multicultural sample consisting of 202 primary and secondary school teachers was drawn from 32 chools in the Western Cape Province of South Africa. Main findings: High levels of reliability were found and uni-dimensionality of the subscales was demonstrated through exploratory factor analyses. Good fit with the data was found for the measurement models through confirmatory factor analyses. Structural equation modelling showed a reasonable fit for the structural model. Positive relationships were found amongst servant leadership, team effectiveness and affective team commitment. Standard multiple regression analysis showed that affective team commitment moderated the relationship between servant leadership and team effectiveness. Practical/managerial implications: The findings emphasise the central role played by servant leadership and affective team commitment in team performance. Servant leadership fosters team effectiveness if employees feel committed to their work team. Contribution/value-add: The servant leadership style alone may not be a sufficient condition for team effectiveness; other variables, such as affective team commitment, also play a role. The study suggested specific variables that may also combine with leadership to positively influence team effectiveness.

  9. Faculty and Student Teams and National Laboratories: Expanding the Reach of Research Opportunities and Workforce Development

    Energy Technology Data Exchange (ETDEWEB)

    Blackburn,N.; White, K.; Stegman, M.

    2009-08-05

    The Faculty and Student Teams (FaST) Program, a cooperative effort between the US Department of Energy (DOE) Office of Science and the National Science Foundation (NSF), brings together collaborative research teams composed of a researcher at Brookhaven National Laboratory, and a faculty member with two or three undergraduate students from a college or university. Begun by the Department of Energy in 2000 with the primary goal of building research capacity at a faculty member's home institution, the FaST Program focuses its recruiting efforts on faculty from colleges and universities with limited research facilities and those institutions that serve populations under-represented in the fields of science, engineering and technology, particularly women and minorities. Once assembled, a FaST team spends a summer engaged in hands-on research working alongside a laboratory scientist. This intensely collaborative environment fosters sustainable relationships between the faulty members and BNL that allow faculty members and their BNL colleagues to submit joint proposals to federal agencies, publish papers in peer-reviewed journals, reform local curriculum, and develop new or expand existing research labs at their home institutions.

  10. Task conflict and team creativity: a question of how much and when.

    Science.gov (United States)

    Farh, Jiing-Lih; Lee, Cynthia; Farh, Crystal I C

    2010-11-01

    Bridging the task conflict, team creativity, and project team development literatures, we present a contingency model in which the relationship between task conflict and team creativity depends on the level of conflict and when it occurs in the life cycle of a project team. In a study of 71 information technology project teams in the greater China region, we found that task conflict had a curvilinear effect on team creativity, such that creativity was highest at moderate levels of task conflict. Additionally, we found this relationship to be moderated by team phase, such that the curvilinear effect was strongest at an early phase. In contrast, at later phases of the team life cycle, task conflict was found to be unrelated to team creativity. (c) 2010 APA, all rights reserved.

  11. Exploring Graduate Students’ Attitudes towards Team Research and Their Scholarly Productivity: A Survey Guided by the Theory of Planned Behavior

    Directory of Open Access Journals (Sweden)

    Tianlan Wei

    2015-01-01

    Full Text Available This study explores the attitudinal and motivational factors underlying graduate students’ attitudes towards team research. Guided by the Theory of Planned Behavior, we hypothesize that attitude, subjective norm, and perceived behavioral control are three major determinants of graduate students’ intentions to conduct team research. An instrument was developed to measure the influences of these factors on students’ intentions and relevant scholarly productivity. A total of 281 graduate students from a large, comprehensive university in the southwest United States participated in the survey. Descriptive statistics reveal that around two-thirds of graduate students have no co-authored manuscripts submitted for publication since they started graduate school. Factor analyses validated the factor structure of the instrument, and the results of Structural Equation Modeling show that (a graduate students’ attitudes towards team research have a positive correlation with their attitudes towards individual research; (b attitude towards team research, subjective norm, and perceived behavioral control, along with students’ discipline/major areas and classification, account for 58% of the variance in the intention to conduct team research; and (c subjective norm appears to be the most influential factor in the model, followed by attitude; while perceived behavioral control is not of much importance. These findings provide implications for academic departments and programs to promote graduate students’ team research. Specifically, creating a climate for collaborative research in academic programs/disciplines/universities may work jointly with enhancing students’ appraisals of such collaborations.

  12. Future Game Developers within a Virtual World: Learner Archetypes and Team Leader Attributes

    Science.gov (United States)

    Franetovic, Marija

    2016-01-01

    This case study research sought to understand a subset of the next generation in reference to virtual world learning within a game development course. The students completed an ill-structured team project which was facilitated using authentic learning strategies within a virtual world over a period of seven weeks. Research findings emerged from…

  13. Fusion research program in Korea

    International Nuclear Information System (INIS)

    Hwang, Y.S.

    1996-01-01

    Fusion research in Korea is still premature, but it is a fast growing program. Groups in several universities and research institutes were working either in small experiments or in theoretical areas. Recently, couple of institutes who have small fusion-related experiments, proposed medium-size tokamak programs to jump into fusion research at the level of international recognition. Last year, Korean government finally approved to construct 'Superconducting Tokamak' as a national fusion program, and industries such as Korea Electric Power Corp. (KEPCO) and Samsung joined to support this program. Korea Basic Science Institute (KBSI) has organized national project teams including universities, research institutes and companies. National project teams are performing design works since this March. (author)

  14. Exploring the use of computer-mediated video communication in engineering projects in South Africa

    Directory of Open Access Journals (Sweden)

    Meyer, Izak P.

    2016-08-01

    Full Text Available Globally-expanding organisations that are trying to capitalise on distributed skills are increasingly using virtual project teams to shorten product development time and increase quality. These virtual teams, which are distributed across countries, cultures, and time zones, are required to use faster and better ways of interacting. Past research has shown that virtual teams that use computer-mediated communication (CMC instead of face-to-face communication are less cohesive because they struggle with mistrust, controlling behaviour , and communication breakdowns. This study aims to determine whether project practitioners in South Africa perceive virtual teams that use videoconferencing as suffering from the same CMC disadvantages described in past research in other environments; and if they do, what the possible causes could be. This paper reports on a survey of 106 project practitioners in South Africa. The results show that these project practitioners prefer face- to-face communication over CMC, and perceive virtual teams using videoconferencing to be less cohesive and to suffer from mistrust and communication breakdowns, but not from increased conflict and power struggles. The perceived shortcomings of videoconferencing might result from virtual teams that use this medium having less time to build interpersonal relationships.

  15. Evaluation of KFB-funded research on transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Boyce, D.; Knudsen, T.; Wegener, M.

    1999-09-01

    This report presents an evaluation of two research projects on transport systems, which have been financed fully or partially by KFB. The projects are: l. Systems analysis of transport markets at the Division of Transport and Location Analysis in the Department of Infrastructure and Planning of the Royal Institute of Technology, Stockholm; and 2. Planning, analysis and management in traffic networks - optimization models and methods at the Division of Optimization in the Department of Mathematics at Linkoeping University. The evaluation seeks to examine the scientific quality of the research and its relevance to the academic world and society. The two project teams prepared a self-assessment of their research activities and submitted copies of relevant publications. The evaluation committee visited both institutions and engaged the teams in discussions of their results and methodology. These visits occurred on June 1 and 2, 1999. This report is based on the self-assessments of the teams, the materials submitted and the meetings with the project teams. The evaluation and recommendations presented in the report are those of the reviewers and do not necessarily represent the views of KFB

  16. A Difficult Journey: Reflections on Driving and Driving Cessation From a Team of Clinical Researchers.

    Science.gov (United States)

    Liddle, Jacki; Gustafsson, Louise; Mitchell, Geoffrey; Pachana, Nancy A

    2017-02-01

    Recognizing the clinical importance and safety and well-being implications for the population, a multidisciplinary team has been researching older drivers and driving cessation issues for more than 15 years. Using empirical approaches, the team has explored quality of life and participation outcomes related to driving and nondriving for older people and has developed interventions to improve outcomes after driving cessation. The team members represent occupational therapists, medical practitioners, and clinical and neuropsychologists. While building the evidence base for driving- and driving cessation-related clinical practice, the researchers have also had first-hand experiences of interruptions to their own or parents' driving; involvement of older family members in road crashes; and provision of support during family members' driving assessment and cessation. This has led to reflection on their understandings and re-evaluation and refocusing of their perspectives in driving cessation research. This work will share the narratives of the authors and note their developing perspectives and foci within research as well as their clinical practice. Personal reflections have indicated the far-reaching implications for older drivers and family members of involvement in road crashes: the potential for interruptions to driving as a time for support and future planning and the conflicting and difficult roles of family members within the driving cessation process. Overall the lived, personal experience of the authors has reinforced the complex nature of driving and changes to driving status for the driver and their support team and the need for further research and support. © The Author 2016. Published by Oxford University Press on behalf of The Gerontological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  17. Reflections on collaboration in consumer research

    DEFF Research Database (Denmark)

    Sørensen, Elin Brandi; The VOICE Group, with

    2008-01-01

    tacit in the marketing literature, namely the impact of the relationships between researchers. The paper draws on accounts of other research collaborations as well as authors' experiences, and discusses how interpersonal and cross-cultural dynamics influence the work of interpretive research teams.......Abstract: Purpose - The purpose of this paper is to explore the challenges and opportunities of collaboration in interpretive consumer research. Design/methodology/approach - The paper reviews literature on research teamwork, particularly on qualitative and international projects. It also provides...... an account of research collaboration on an interpretive research project across four countries, involving eight researchers. Findings - Despite the cult of individualism in academic life, most articles in leading marketing journals are now written by multi-author teams. The process and implications...

  18. IODP Expedition 360: Analyzing the Media Coverage of a High Profile Research Project

    Science.gov (United States)

    Kavanagh, L.; Martinez, A. O.; Burgio, M.; Zhang, J.; Expedition 360 Scientists, I.

    2016-12-01

    During Expedition 360 of the International Ocean Discovery Program (IODP), the JOIDES Resolution drilled 789 meters of lower crustal gabbro in the Southwest Indian Ocean. This hole began a multi-expedition project with the goal of one day drilling across the crust-mantle boundary for the first time. This simplified narrative of the research objectives struck a chord with media and the project received worldwide coverage in the form of over 50 stories with a total audience in the millions. This expedition is presented as a case study in science communication. A four-member education and outreach team onboard the ship acted as the point of contact for interested reporters. Major outlets that ran stories include the Australian Broadcasting Corporation, British Broadcasting Corporation, Boston Globe, Daily Express, Fox News, Nature, Smithsonian, and Chinese based Xinhua News Agency who sailed a reporter on the ship for the duration of the expedition. The majority of stories published provided accurate and favourable coverage of the project; however, a few contained critical errors and cast the expedition in a less positive light. Public reaction varied greatly depending on the article. Positive themes include interest in the scientific outcomes and encouragement of human exploration. Negative themes include the project being an inefficient use of money and a perceived risk of the drilling triggering an earthquake or volcano. Through a review of published articles and online comments, the successes and challenges faced by Expedition 360 are identified. Despite minimal preparation for media relations, the team successfully maintained a public profile while working in one of the most remote locations on Earth. Interviews were facilitated and videos, articles, and podcasts were produced onboard the ship. A simple, catchy narrative resulted in a large volume of coverage; however, this simplicity also formed the root of a number of misconceptions and issues of public concern.

  19. Using Social Media for Research Dissemination: The Digital Research Video Project

    Directory of Open Access Journals (Sweden)

    Suzanne Pilaar Birch

    2013-09-01

    Full Text Available This article discusses the outcomes of the Digital Research Video Project, which was part of the larger Social Media Knowledge Exchange program at the Centre for Research in the Arts, Social Sciences, and Humanities (CRASSH at the University of Cambridge and funded by the Arts & Humanities Research Council (UK. The project was founded on the premise that open access publication of research, while important, does not necessarily make research accessible. Often, PhD students and post-doctoral scholars lack the skills needed to communicate their research to a broader audience. The goal of the project was, first, to provide communication training to early career researchers (achieved through a workshop held in autumn 2012 and second, to create illustrated videos highlighting projects by early career researchers that would help them engage with their work using multimedia and share their results with a larger audience. This article considers the methods of dissemination and impact of the project.

  20. Research projects of STUK 2000-2002

    Energy Technology Data Exchange (ETDEWEB)

    Salomaa, S. [ed.

    2000-06-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2000 - 2002 summarises STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and the health effects of radiation. During 2000 - 2002, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research activities are now more international than ever; the institute is involved in about 20 research projects funded by EC. Apart from the European Union and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (author)

  1. Exploring the concept of a team approach to wound care: Managing wounds as a team.

    Science.gov (United States)

    Moore, Zena; Butcher, Gillian; Corbett, Lisa Q; McGuiness, William; Snyder, Robert J; van Acker, Kristien

    2014-05-01

    Background - The growing prevalence and incidence of nonhealing acute and chronic wounds is a worrying concern. A major challenge is the lack of united services aimed at addressing the complex needs of individuals with wounds. However, the WHO argues that interprofessional collaboration in education and practice is key to providing the best patient care, enhancing clinical and health-related outcomes and strengthening the health system. It is based on this background that the team approach to wound care project was conceptualised. The project was jointly initiated and realised by the Association for the Advancement of Wound Care (AAWC-USA), the Australian Wound Management Association (AWMA) and the European Wound Management Association (EWMA). Aim - The aim of this project was to develop a universal model for the adoption of a team approach to wound care. Objective The overarching objective of this project was to provide recommendations for implementing a team approach to wound care within all clinical settings and through this to develop a model for advocating the team approach toward decision makers in national government levels. Method An integrative literature review was conducted. Using this knowledge, the authors arrived at a consensus on the most appropriate model to adopt and realise a team approach to wound care. Results - Eighty four articles met the inclusion criteria. Following data extraction, it was evident that none of the articles provided a definition for the terms multidisciplinary, interdisciplinary or transdisciplinary in the context of wound care. Given this lack of clarity within the wound care literature, the authors have here developed a Universal Model for the Team Approach to Wound Care to fill this gap in our current understanding. Conclusion - We advocate that the patient should be at the heart of all decision-making, as working with the Universal Model for the Team Approach to Wound Care begins with the needs of the patient. To

  2. NASA Microgravity Science Competition for High-school-aged Student Teams

    Science.gov (United States)

    DeLombard, Richard; Stocker, Dennis; Hodanbosi, Carol; Baumann, Eric

    2002-01-01

    NASA participates in a wide variety of educational activities including competitive events. There are competitive events sponsored by NASA and student teams which are mentored by NASA centers. This participation by NASA in public forums serves to bring the excitement of aerospace science to students and educators. A new competition for highschool-aged student teams involving projects in microgravity has completed two pilot years and will have national eligibility for teams during the 2002-2003 school year. A team participating in the Dropping In a Microgravity Environment will research the field of microgravity, develop a hypothesis, and prepare a proposal for an experiment to be conducted in a microgravity drop tower facility. A team of NASA scientists and engineers will select the top proposals and those teams will then design and build their experiment apparatus. When the experiment apparatus are completed, team representatives will visit NASA Glenn in Cleveland, Ohio for operation of their facility and participate in workshops and center tours. Presented in this paper will be a description of DIME, an overview of the planning and execution of such a program, results from the first two pilot years, and a status of the first national competition.

  3. Forming Student Online Teams for Maximum Performance

    Science.gov (United States)

    Olson, Joel D.; Ringhand, Darlene G.; Kalinski, Ray C.; Ziegler, James G.

    2015-01-01

    What is the best way to assign graduate business students to online team-based projects? Team assignments are frequently made on the basis of alphabet, time zones or previous performance. This study reviews personality as an indicator of student online team performance. The personality assessment IDE (Insights Discovery Evaluator) was administered…

  4. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  5. Beginning with Our Voices: How the Experiential Stories of First Nations Women Contribute to a National Research Project.

    Science.gov (United States)

    Acoose, Sharon; Blunderfield, Debbie; Dell, Colleen Anne; Desjarlais, Val

    2009-12-01

    The purpose of this paper is to review how the experiential stories of First Nations women contribute to a national research project. The project focuses on how women's healing is impacted by their views about themselves as - and the stigma associated with being - a drug user, involved in crime and an Aboriginal woman. Our project began with three First Nations women on our research team documenting the role of stigma and self-identity in their personal healing journeys from problematically using drugs and being in conflict with the law. In this paper we discuss how key components of feminist research practices, Aboriginal methodology and community-based research helped us position the women's experiential stories in authoritative, recognized and celebrated ways in our study. We illustrate how the women's stories uniquely contributed to the creation of our interview questions and the research project in general. We also discuss how the women personally benefited from writing about and sharing their experiences. Key benefits include the women discovering the impact of the written word, promotion of their healing, personal recognition of their ability to offer hope to women in need, increased self-esteem, and increased appreciation of the importance of sharing their lived experiences with others. Our method of research differs from a conventional western scientific approach to understanding, and as such made important contributions to both the project itself and the women who shared their experiential stories.

  6. Landsat Science Team meeting: Winter 2015

    Science.gov (United States)

    Schroeder, Todd A.; Loveland, Thomas; Wulder, Michael A.; Irons, James R.

    2015-01-01

    The summer meeting of the joint U.S. Geological Survey (USGS)–NASA Landsat Science Team (LST) was held at the USGS’s Earth Resources Observation and Science (EROS) Center July 7-9, 2015, in Sioux Falls, SD. The LST co-chairs, Tom Loveland [EROS—Senior Scientist] and Jim Irons [NASA’s Goddard Space Flight Center (GSFC)—Landsat 8 Project Scientist], opened the three-day meeting on an upbeat note following the recent successful launch of the European Space Agency’s Sentinel-2 mission on June 23, 2015 (see image on page 14), and the news that work on Landsat 9 has begun, with a projected launch date of 2023.With over 60 participants in attendance, this was the largest LST meeting ever held. Meeting topics on the first day included Sustainable Land Imaging and Landsat 9 development, Landsat 7 and 8 operations and data archiving, the Landsat 8 Thermal Infrared Sensor (TIRS) stray-light issue, and the successful Sentinel-2 launch. In addition, on days two and three the LST members presented updates on their Landsat science and applications research. All presentations are available at landsat.usgs.gov/science_LST_Team_ Meetings.php.

  7. The potential improvement of team-working skills in Biomedical and Natural Science students using a problem-based learning approach

    OpenAIRE

    Forough L. Nowrouzian; Anne Farewell

    2013-01-01

    Teamwork has become an integral part of most organisations today, and it is clearly important in Science and other disciplines. In Science, research teams increase in size while the number of single-authored papers and patents decline. Team-work in laboratory sciences permits projects that are too big or complex for one individual to be tackled. This development requires that students gain experience of team-work before they start their professional career. Students working in teams this may ...

  8. Research projects of STUK 2003-2005

    International Nuclear Information System (INIS)

    Salomaa, S.

    2004-01-01

    The primary goal of STUK, Finnish Radiation and Nuclear Safety Authority, is to protect man, society, environment and future generations from the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2003 - 2005 summarizes STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy, and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and health effects of radiation. During 2003 - 2005 the main emphasis will be on research supporting the Finnish national environmental health action plan, and projects concerning the health risks of radiation, nuclear emergency preparedness and protection of biota. EU directives on radiation protection and medical radiation exposure also influence the course taken by the research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research networks involve well over 100 national and international partners. During 2003 - 2005 STUK is actively participating in the 6th framework research programmes of EC

  9. Rx-CADRE (Prescribed Fire Combustion-Atmospheric Dynamics Research Experiments) collaborative research in the core fire sciences

    Science.gov (United States)

    D. Jimenez; B. Butler; K. Hiers; R. Ottmar; M. Dickinson; R. Kremens; J. O' Brien; A. Hudak; C. Clements

    2009-01-01

    The Rx-CADRE project was the combination of local and national fire expertise in the field of core fire research. The project brought together approximately 30 fire scientists from six geographic regions and seven diff erent agencies. The project objectives were to demonstrate the capacity for collaborative research by bringing together individuals and teams with a...

  10. Transforming Virtual Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    2005-01-01

    Investigating virtual team collaboration in industry using grounded theory this paper presents the in-dept analysis of empirical work conducted in a global organization of 100.000 employees where a global virtual team with participants from Sweden, United Kingdom, Canada, and North America were...... studied. The research question investigated is how collaboration is negotiated within virtual teams? This paper presents findings concerning how collaboration is negotiated within a virtual team and elaborate the difficulties due to invisible articulation work and managing multiple communities...... in transforming the virtual team into a community. It is argued that translucence in communication structures within the virtual team and between team and management is essential for engaging in a positive transformation process of trustworthiness supporting the team becoming a community, managing the immanent...

  11. Virtual Teams and Knowledge Communication

    DEFF Research Database (Denmark)

    Lehtonen, Miikka; Kampf, Constance Elizabeth

    2014-01-01

    How does culture affect virtual teams and the knowledge communication processes in which they engage? As virtual spaces are increasingly used to support teams and establish collaboration in cross-cultural projects, the notion of cross-cultural communication can be understood as shifting from...... contextual perspective to a semiotic perspective. That is to say, although the team members are using the same vocabulary they might attach different meanings to and have different knowledge about them thus highlighting the importance of approaching virtual teams and collaboration from a semiotic perspective....... To look at how knowledge about virtual work is established in a multinational context, we interviewed members of a team that connects Finland and India. Results reveal five objects shared between the team members with varying knowledge about them. By making these differences in knowledge visible through...

  12. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    Science.gov (United States)

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served

  13. The Team Climate Inventory: application in hospital teams and methodological considerations.

    Science.gov (United States)

    Ouwens, M; Hulscher, M; Akkermans, R; Hermens, R; Grol, R; Wollersheim, H

    2008-08-01

    To test the validity, reliability and discriminating capacity of an instrument to assess team climate, the Team Climate Inventory (TCI), in a sample of Dutch hospital teams. The TCI is based on a four-factor theory of team climate for innovation. Validation study. Hospital teams in The Netherlands. 424 healthcare professionals; 355 nurses working in 22 nursing teams and 69 nurses and doctors working in 14 quality-improvement teams. Exploratory and confirmatory factor analyses, Pearson's product moment correlations, internal homogeneity of the TCI scales based on Cronbach alpha, and the TCI capability to discriminate between two types of healthcare teams, namely nursing teams and quality-improvement teams. The validity test revealed the TCI's five-factor structure and moderate data fit. The Cronbach alphas of the five scales showed acceptable reliabilities. The TCI discriminated between nursing teams and quality-improvement teams. The mean scores of quality-improvement teams were all significantly higher than those of the nursing teams. Patient care teams are essential for high-quality patient care, and team climate is an important characteristic of successful teams. This study shows that the TCI is a valid, reliable and discriminating self-report measure of team climate in hospital teams. The TCI can be used as a quality-improvement tool or in quality-of-care research.

  14. Viewpoint - IWRM and I: A reflexive travelogue of the Flows and Practices research team

    NARCIS (Netherlands)

    Bolding, J.A.; Alba, R.

    2016-01-01

    viewpoint article critically discusses how IWRM travelled to each of the researchers of the Flows and Practices team, through which networks they personally engaged with IWRM, what opportunities the IWRM saga offered these researchers and how they tried to translate the concept and policy idea of

  15. Building a Community of Research Practice: Intragroup Team Social Dynamics in Interdisciplinary Mixed Methods

    Science.gov (United States)

    Hemmings, Annette; Beckett, Gulbahar; Kennerly, Susan; Yap, Tracey

    2013-01-01

    This article explicates the intragroup social dynamics and work of a nursing and education research team as a community of research practice interested in organizational cultures and occupational subcultures. Dynamics were characterized by processes of socialization through reeducation and group social identity formation that enabled members to…

  16. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  17. The Undergraduate ALFALFA Team: Outcomes for Over 250 Undergraduate Participants

    Science.gov (United States)

    Troischt, Parker; Koopmann, Rebecca A.; Haynes, Martha P.; ALFALFA Team

    2016-01-01

    The NSF-sponsored Undergraduate ALFALFA (Arecibo Legacy Fast ALFA) Team (UAT) is a consortium of 19 institutions founded to promote undergraduate research and faculty development within the extragalactic ALFALFA HI blind survey project and follow-up programs. In this talk we present outcomes for the more than 250 undergraduate students who have who have participated in the program during the 8 years of funding. 40% of these students have been women and members of underrepresented groups. To date 148 undergraduate students have attended annual workshops at Arecibo Observatory, interacting with faculty, graduate students, their peers, and Arecibo staff in lectures, group activities, tours, and observing runs. Team faculty have supervised 159 summer research projects and 120 academic year (e.g., senior thesis) projects. 68 students have traveled to Arecibo Observatory for observing runs and 55 have presented their results at national meetings such as the AAS. Through participation in the UAT, students are made aware of career paths they may not have previously considered. More than 90% of alumni are attending graduate school and/or pursuing a career in STEM. 42% of those pursuing graduate degrees in Physics or Astronomy are women. This work has been supported by NSF grants AST-0724918/0902211, AST-075267/0903394, AST-0725380, and AST-1211005

  18. Characteristics of the safety climate in teams with world-class safety ...

    African Journals Online (AJOL)

    Accidents and incidents in the construction environment are not reduced or eliminated effectively, despite numerous efforts made to improve health and safety in the industry. An extensive field of research has been conducted on how teams in the construction environment interact to deliver a project successfully in terms of ...

  19. Team Based Engineering Design Thinking

    Science.gov (United States)

    Mentzer, Nathan

    2014-01-01

    The objective of this research was to explore design thinking among teams of high school students. This objective was encompassed in the research question driving the inquiry: How do teams of high school students allocate time across stages of design? Design thinking on the professional level typically occurs in a team environment. Many…

  20. Task versus relationship conflict, team performance and team member satisfaction: a meta-analysis

    NARCIS (Netherlands)

    de Dreu, C.K.W.; Weingart, L.R.

    2003-01-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, resultsrevealed strong and negative correlations between relationship conflict, team performance, and

  1. Developing leadership in rural interprofessional palliative care teams.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Handfield-Jones, Richard; Bouvette, Maryse

    2008-01-01

    This project brought together community-based practitioners and academics to develop and deliver interventions designed to enhance the leadership abilities of the designated leaders of seven rural/small town-based palliative care teams. Members of these community-based teams have already gained recognition for their teams' leadership and service delivery in their communities. All of the teams had worked closely with most members of the academic team prior to this project. The team members participated in a needs assessment exercise developed by the Sisters of Charity of Ottawa Health Service and University of Ottawa academic team. Results of the needs assessment identified leadership qualities that had contributed to their success, as well as their needs to further enhance their individual leadership qualities. The team effort, however, was the most important factor contributing to the success of their work. The interventions developed to address the identified needs had to be adapted creatively through the collaborative efforts of both the community and academic teams. The educational interventions facilitated the integration of learning at the individual and community level into the busy work schedules of primary health care providers.

  2. The joint project for high-intensity proton accelerators

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) agreed to promote the joint project integrating both the Neutron Science Project (NSP) of JAERI and the Japan Hadron Facility Project (JHF) of KEK for comprehensive studies on basic science and technology using high-intensity proton accelerator. This document describes the joint proposal prepared by the Joint Project Team of JAERI and KEK to construct accelerators and research facilities necessary both for the NSP and the JHF at the site of JAERI Tokai Establishment. (author)

  3. Enabling Team Learning in Healthcare

    Science.gov (United States)

    Boak, George

    2016-01-01

    This paper is based on a study of learning processes within 35 healthcare therapy teams that took action to improve their services. The published research on team learning is introduced, and the paper suggests it is an activity that has similarities with action research and with those forms of action learning where teams address collective…

  4. Quality charters or quality members? A control theory perspective on team charters and team performance.

    Science.gov (United States)

    Courtright, Stephen H; McCormick, Brian W; Mistry, Sal; Wang, Jiexin

    2017-10-01

    Though prevalent in practice, team charters have only recently received scholarly attention. However, most of this work has been relatively devoid of theory, and consequently, key questions about why and under what conditions team charter quality affects team performance remain unanswered. To address these gaps, we draw on macro organizational control theory to propose that team charter quality serves as a team-level "behavior" control mechanism that builds task cohesion through a structured exercise. We then juxtapose team charter quality with an "input" team control mechanism that influences the emergence of task cohesion more organically: team conscientiousness. Given their redundant effects on task cohesion, we propose that the effects of team charter quality and team conscientiousness on team performance (through task cohesion) are substitutive such that team charter quality primarily impacts team performance for teams that are low (vs. high) on conscientiousness. We test and find support for our hypotheses in a sample of 239 undergraduate self-managing project teams. Our study contributes to the groups and teams literature in the following ways: first, relative to previous studies, we take a more theory-driven approach toward understanding team charters, and in doing so, uncover when and why team charter quality impacts team performance; second, we integrate two normally disparate perspectives on team effectiveness (team development and team selection) to offer a broader perspective on how teams are "built"; and third, we introduce team charter quality as a performance-enhancing mechanism for teams lower on conscientiousness. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  5. Team-Based Development of Medical Devices: An Engineering–Business Collaborative

    Science.gov (United States)

    Eberhardt, Alan W.; Johnson, Ophelia L.; Kirkland, William B.; Dobbs, Joel H.; Moradi, Lee G.

    2016-01-01

    There is a global shift in the teaching methodology of science and engineering toward multidisciplinary, team-based processes. To meet the demands of an evolving technical industry and lead the way in engineering education, innovative curricula are essential. This paper describes the development of multidisciplinary, team-based learning environments in undergraduate and graduate engineering curricula focused on medical device design. In these programs, students actively collaborate with clinicians, professional engineers, business professionals, and their peers to develop innovative solutions to real-world problems. In the undergraduate senior capstone courses, teams of biomedical engineering (BME) and business students have produced and delivered numerous functional prototypes to satisfied clients. Pursuit of commercialization of devices has led to intellectual property (IP) disclosures and patents. Assessments have indicated high levels of success in attainment of student learning outcomes and student satisfaction with their undergraduate design experience. To advance these projects toward commercialization and further promote innovative team-based learning, a Master of Engineering (MEng) in Design and Commercialization was recently launched. The MEng facilitates teams of graduate students in engineering, life sciences, and business who engage in innovation-commercialization (IC) projects and coursework that take innovative ideas through research and development (R&D) to create marketable devices. The activities are structured with students working together as a “virtual company,” with targeted outcomes of commercialization (license agreements and new start-ups), competitive job placement, and/or career advancement. PMID:26902869

  6. Team-Based Development of Medical Devices: An Engineering-Business Collaborative.

    Science.gov (United States)

    Eberhardt, Alan W; Johnson, Ophelia L; Kirkland, William B; Dobbs, Joel H; Moradi, Lee G

    2016-07-01

    There is a global shift in the teaching methodology of science and engineering toward multidisciplinary, team-based processes. To meet the demands of an evolving technical industry and lead the way in engineering education, innovative curricula are essential. This paper describes the development of multidisciplinary, team-based learning environments in undergraduate and graduate engineering curricula focused on medical device design. In these programs, students actively collaborate with clinicians, professional engineers, business professionals, and their peers to develop innovative solutions to real-world problems. In the undergraduate senior capstone courses, teams of biomedical engineering (BME) and business students have produced and delivered numerous functional prototypes to satisfied clients. Pursuit of commercialization of devices has led to intellectual property (IP) disclosures and patents. Assessments have indicated high levels of success in attainment of student learning outcomes and student satisfaction with their undergraduate design experience. To advance these projects toward commercialization and further promote innovative team-based learning, a Master of Engineering (MEng) in Design and Commercialization was recently launched. The MEng facilitates teams of graduate students in engineering, life sciences, and business who engage in innovation-commercialization (IC) projects and coursework that take innovative ideas through research and development (R&D) to create marketable devices. The activities are structured with students working together as a "virtual company," with targeted outcomes of commercialization (license agreements and new start-ups), competitive job placement, and/or career advancement.

  7. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    Science.gov (United States)

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved

  8. Contextual Student Learning through Authentic Asteroid Research Projects using a Robotic Telescope Network

    Science.gov (United States)

    Hoette, Vivian L.; Puckett, Andrew W.; Linder, Tyler R.; Heatherly, Sue Ann; Rector, Travis A.; Haislip, Joshua B.; Meredith, Kate; Caughey, Austin L.; Brown, Johnny E.; McCarty, Cameron B.; Whitmore, Kevin T.

    2015-11-01

    Skynet is a worldwide robotic telescope network operated by the University of North Carolina at Chapel Hill with active observing sites on 3 continents. The queue-based observation request system is simple enough to be used by middle school students, but powerful enough to supply data for research scientists. The Skynet Junior Scholars program, funded by the NSF, has teamed up with professional astronomers to engage students from middle school to undergraduates in authentic research projects, from target selection through image analysis and publication of results. Asteroid research is a particularly fruitful area for youth collaboration that reinforces STEM education standards and can allow students to make real contributions to scientific knowledge, e.g., orbit refinement through astrometric submissions to the Minor Planet Center. We have created a set of projects for youth to: 1. Image an asteroid, make a movie, and post it to a gallery; 2. Measure the asteroid’s apparent motion using the Afterglow online image processor; and 3. Image asteroids from two or more telescopes simultaneously to demonstrate parallax. The apparent motion and parallax projects allow students to estimate the distance to their asteroid, as if they were the discoverer of a brand new object in the solar system. Older students may take on advanced projects, such as analyzing uncertainties in asteroid orbital parameters; studying impact probabilities of known objects; observing time-sensitive targets such as Near Earth Asteroids; and even discovering brand new objects in the solar system.Images are acquired from among seven Skynet telescopes in North Carolina, California, Wisconsin, Canada, Australia, and Chile, as well as collaborating observatories such as WestRock in Columbus, Georgia; Stone Edge in El Verano, California; and Astronomical Research Institute in Westfield, Illinois.

  9. Top management team heterogeneity and firm performance: An empirical research on Chinese listed companies

    Institute of Scientific and Technical Information of China (English)

    ZHANG Ping

    2007-01-01

    An empirical study of the 2001-2002 data from 356 Chinese companies listed in the Shanghai and Shenzhen stock exchanges indicates that within the social context of China the characteristics of a firm's top management team have a different impact on firm performance from those of foreign countries. Also, the tenure heterogeneity and functional experience heterogeneity of the top management team are inversely related to firm performance. This paper analyzes and discusses the findings in detail and points out areas for future research.

  10. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  11. Gender and tenure diversity in GitHub teams

    NARCIS (Netherlands)

    Vasilescu, B.N.; Posnett, D.; Ray, B.; Brand, van den M.G.J.; Serebrenik, A.; Devanbu, P.; Filkov, V.

    2015-01-01

    Software development is usually a collaborative venture. Open Source Software (OSS) projects are no exception; indeed, by design, the OSS approach can accommodate teams that are more open, geographically distributed, and dynamic than commercial teams. This, we find, leads to OSS teams that are quite

  12. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1982-10-01

    The experimental plasma Research Branch has responsibility for developing a broad range of experimental data and new experimental techniques that are required for operating and interpreting present large-scale confinement experiments, and for designing future deuterium-tritium burining facilities. The Branch pursued these objectives by supporting research in DOE laboratories, other Federal laboratories, other Federal laboratories, universities, and private industry. Initiation and renewal of research projects are primarily through submission of unsolicited proposals by these institutions to DOE. Summaries of these projects are given

  13. The impact of athlete leaders on team members’ team outcome confidence: A test of mediation by team identification and collective efficacy

    OpenAIRE

    Fransen, Katrien; Coffee, Pete; Vanbeselaere, Norbert; Slater, Matthew; De Cuyper, Bert; Boen, Filip

    2014-01-01

    Research on the effect of athlete leadership on pre-cursors of team performance such as team confidence is sparse. To explore the underlying mechanisms of how athlete leaders impact their team’s confidence, an online survey was completed by 2,867 players and coaches from nine different team sports in Flanders (Belgium). We distinguished between two types of team confidence: collective efficacy, assessed by the CEQS subscales of Effort, Persistence, Preparation, and Unity; and team outcome con...

  14. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  15. Every team needs a coach: Training for interprofessional clinical placements.

    Science.gov (United States)

    Grymonpre, Ruby; Bowman, Susan; Rippin-Sisler, Cathy; Klaasen, Kathleen; Bapuji, Sunita B; Norrie, Ola; Metge, Colleen

    2016-09-01

    Despite growing awareness of the benefits of interprofessional education and interprofessional collaboration (IPC), understanding how teams successfully transition to IPC is limited. Student exposure to interprofessional teams fosters the learners' integration and application of classroom-based interprofessional theory to practice. A further benefit might be reinforcing the value of IPC to members of the mentoring team and strengthening their IPC. The research question for this study was: Does training in IPC and clinical team facilitation and mentorship of pre-licensure learners during interprofessional clinical placements improve the mentoring teams' collaborative working relationships compared to control teams? Statistical analyses included repeated time analysis multivariate analysis of variance (MANOVA). Teams on four clinical units participated in the project. Impact on intervention teams pre- versus post-interprofessional clinical placement was modest with only the Cost of Team score of the Attitudes Towards Healthcare Team Scale improving relative to controls (p = 0.059) although reflective evaluations by intervention team members noted many perceived benefits of interprofessional clinical placements. The significantly higher group scores for control teams (geriatric and palliative care) on three of four subscales of the Assessment of Interprofessional Team Collaboration Scale underscore our need to better understand the unique features within geriatric and palliative care settings that foster superior IPC and to recognise that the transition to IPC likely requires a more diverse intervention than the interprofessional clinical placement experience implemented in this study. More recently, it is encouraging to see the development of innovative tools that use an evidence-based, multi-dimensional approach to support teams in their transition to IPC.

  16. An O-"fish"-ial Research Project

    Science.gov (United States)

    Newman, James; Krustchinsky, Rick; Vanek, Karen; Nguyen, Kim-Thoa

    2009-01-01

    In this "O-"fish"-ial" research project, third-grade students use multiple resources to research several fish species, write a research paper and develop a PowerPoint presentation to communicate their findings. In addition, students actually examine these species up close with samples from the local market, and then conclude the project with a…

  17. IT Security Specialist | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The IT Security Specialist takes a strategic role in the delivery of Infrastructure ... on IT Security to project managers, business clients and senior management. ... as a team member or a team leader by undertaking research, investigations, ...

  18. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  19. Multidisciplinary safety team (MDST) factors of success.

    Science.gov (United States)

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  20. Technology Base Research Project for electrochemical energy storage

    Science.gov (United States)

    Kinoshita, K.

    1985-06-01

    The DOE Electrochemical Energy Storage Program is divided into two projects: (1) the exploratory technology development and testing (ETD) project and (2) the technology base research (TBR) project. The role of the TBR Project is to perform supporting research for the advanced battery systems under development by the ETD Project, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the TBR Project is to identify the most promising electrochemical technologies and transfer them to industry and/or the ETD Project for further development and scale-up. This report summarizes the research, financial, and management activities relevant to the TBR Project in CY 1984. General problem areas addressed by the project include identification of new electrochemical couples for advanced batteries, determination of technical feasibility of the new couples, improvements in battery components and materials, establishment of engineering principles applicable to electrochemical energy storage and conversion, and the assessment of fuel-cell technology for transportation applications. Major emphasis is given to applied research which will lead to superior performance and lower life-cycle costs. The TBR Project is divided into three major project elements: exploratory research, applied science research, and air systems research.