  1. TMI-related requirements for new operating licenses. Technical report

    International Nuclear Information System (INIS)

    1980-06-01

    There are four types of TMI-related requirements and actions approved by the Commission for new operating licenses: (1) those required to be completed by a license applicant prior to receiving a fuel-loading and low-power testing license, (2) those required to be completed by a license applicant prior to receiving a license to operate at appreciable power levels up to full power, (3) those the NRC will take prior to issuing a fuel-loading and low-power testing or a full-power operating license, and (4) those required to be completed by a licensee prior to a specified date. In this report, only those dated requirements that have already been issued are of interest. Other dated requirements are expected to be issued in the future as work progresses in accordance with the TMI Action Plan. This report summarizes the several parts of the list of TMI-related requirements approved by the Commission for new operating licenses

  2. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  12. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  13. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  14. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  15. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  16. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  18. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  19. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  20. Why operators fail licensing examinations

    International Nuclear Information System (INIS)

    Roth, D.R.; Zerbo, J.N.

    1975-01-01

    A survey was conducted among nuclear utility operators who have taken NRC licensing examinations to determine which factors they considered important in their success or failure. The operators also compared the actual NRC examination with their expectations prior to taking the examination. The results of the survey supplement NRC statistics with regard to failure rates. Over 350 operators and 20 utilities participated in the survey and a good cross section of the nuclear community is represented. Reactor theory and emergency procedures are important areas in which operators found NRC emphasis to be different than expected. Observation Training and Design Lecture Series are two training segments which appear to require improvement. Recommendations are made for the use of data collected through this survey and for continuation of the effort to give operators a mechanism of supplying feedback to the training and licensing process

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  3. Selection/licensing of nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.

    1983-07-01

    An important aspect of nuclear power plant (NPP) safety is the reactor operator in the control room. The operators are the first individuals to deal with an emergency situation, and thus, effective performance on their part is essential for safe plant operations. Important issues pertaining to NPP reactor operators would fall within the personnel subsystem of our safety system analysis. While there are many potential aspects of the personnel subsystem, a key first step in this focus is the selection of individuals - attempting to choose individuals for the job of reactor operator who will safely perform the job. This requires a valid (job-related) selection process. Some background information on the Nuclear Regulatory Commission (NRC) licensing process used for selecting NPP reactor operators is briefly presented and a description of a research endeavor now underway at Battelle for developing a valid reactor operator licensing examination is included

  4. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Science.gov (United States)

    2010-10-01

    ... space stations. (a) Earth station applicants or entities filing a “letter of intent” or “Petition for... Union. (d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space... 47 Telecommunication 2 2010-10-01 2010-10-01 false Application requirements for earth stations...

  5. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  6. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  7. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  8. U.S. regulatory requirements for nuclear plant license renewal: The B and W Owners Group License Renewal Program

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    2004-01-01

    This paper discusses the current U.S. Regulatory Requirements for License Renewal and describes the Babcock and Wilcox Owners Group (B and WOG) Generic License Renewal Program (GLRP). The B and W owners, recognizing the need to obtain the maximum life for their nuclear generating units, embarked on a program to renew the licenses of the seven reactors in accordance with the requirements of the Atomic Energy Act of 1954 and further defined by Title 10 of the Code of Federal Regulation Part 54 (10 CFR 54). These reactors, owned by five separate utilities, are Pressurized Water Reactors (PWR) ranging in net rated capacity from approximately 800 to 900 MW. The plants, predominately constructed in the 70s, have USNRC Operating Licenses that expire between 2013 to 2017. (author)

  9. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  10. The development of reactor operator license examination question bank

    International Nuclear Information System (INIS)

    Kim, In Hwan; Woo, S. M.; Kam, S. C.; Nam, K. J.; Lim, H. P.

    2001-12-01

    The number of NPP keeps increasing therefore there is more need of reactor operators. This trend requires the more efficiency in managing the license examination. Question bank system will help us to develop good quality examination materials and keep them in it. The ultimate purpose of the bank system is for selecting qualified reactor operators who are primarily responsible for the safety of reactor operation in NPP

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  12. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  13. Recruitment training and licensing of operating personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Palabrica, R.J.

    1979-01-01

    This article covers the step-by-step and most rigid recruitment, training, and licensing procedures undertaken in the selection for personnel involved in nuclear power plant operations. These procedures are true to all countries. However, for developing countries such as the Philippines, a bachelor's degree may be required as compared with the U.S. wherein a high school diploma is the minimum requirement. Because of the complexity of a nuclear facility, the work will require highly capable individuals with mature judgement who can render correct decisions even under highly stressed conditions. Thus during the selection and recruitment of applicants for the operator position, they are not only given aptitude tests but are also subjected to a series of psychological examintions. Once they are accepted, they are made to undergo a comprehensive and in-depth training to ensure that they will be capable of operating the nuclear power plant safely and effectively. Finally, those prospective operators have to pass licensing examinations in order to prove their competence and skills. Retraining programs follow after their training to maintain their skills. (RTD)

  14. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  15. Renewal of operating licenses: the U.S. model

    International Nuclear Information System (INIS)

    Petroll, M.; Tveiten, B.

    2006-01-01

    Nearly half of the American nuclear power plants by now have been granted permits allowing them to be operated for twenty years more than originally planned. Procedures to this effect are under way for one quarter of U.S. nuclear power plants. For the operators, plant life extension, as a rule, is economically preferable to building new baseload plants or buying electricity from other sources. In the licensing procedures, the U.S. regulatory authority examines both environmental aspects and safety aspects of extended operation. The technical basis of assessment is the GALL report (Generic Aging Lessons Learnt) which by now has become the consolidated yardstick used by the authorities for safety assessment. In these procedures, the licensee is required to present updated design documents and, if applicable, extend or create from scratch programs of aging management. The case of the oldest nuclear power plant in operation in the United States is described to show the steps of an American licensing and administrative court procedure. Granting renewed operating permits began before President Bush's term and will continue independent of the change in government in 2008. (orig.)

  16. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  17. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  18. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  19. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  20. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  1. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Science.gov (United States)

    2013-07-31

    ... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear... nuclear power plant. Compliance with the provisions of the rule is required by June 20, 2014. This... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to...

  2. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  3. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  4. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  5. Licensing Support Experience of the BN-600 Operation

    International Nuclear Information System (INIS)

    Khrennikov, N.; Sintsov, A.

    2013-01-01

    License procedure - Main principle: • All works, including fatigue tests of new types of fuel, are carried out at the unit 3 Beloyarsk nuclear power plants with the BN-600 reactor with the justification of the regulatory body. • Justification procedure is standard for all power units and independent from the reactor types. • The regulatory body and independent experts or technical support organizations, which can be involved in this work by the regulatory body, review SAR, operational manuals and other operator documents. • Safety requirements (i.e. Federal rules and codes). The project and design documents shall meet safety requirements. • The technical and organizational measures for safety guarantee shall meet well-known results of the research investigations or shall be experimental validate

  6. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  7. Answers to questions at public meetings regarding implementation of Title 10, Code of Federal Regulations, Part 55 on operators' licenses

    International Nuclear Information System (INIS)

    1987-11-01

    This document presents questions and answers based on the transcripts of four public meetings (and from written questions submitted after the meetings) conducted from April 9 to April 20, 1987 by the staff of the US Nuclear Regulatory Commission. The meetings discussed implementation of the Commission's final rule governing Operators' Licenses and Conforming Amendments (10 CFR Parts 55 and 50). The rule became effective May 26, 1987 and is intended to clarify the regulations for issuing licenses to operators and senior operators; revise the requirements and scope of written examinations and operating tests for operators and senior operators, require a simulation facility; clarify procedures for administering requalification examinations; and describe the form and content for operator license applications

  8. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  9. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  10. Psychological characteristics of licensed nuclear power plant operators

    International Nuclear Information System (INIS)

    Sajwaj, T.; Ford, T.; McGee, R.K.

    1987-01-01

    The safe production of electricity by nuclear power plants has been the focus of considerable attention. Much of this concern has been focused on equipment and procedural issues, with less attention to the psychological factors that affect the operations staff of the plants, i.e., those individuals who are most directly responsible for a plant's operations. Stress and type A qualities would be significant for these individuals because of their relationships to job performance and health. Of equal significance would be work-related factors, such as job involvement and work pressure. Also of interest would be hostile tendencies because of the need for cooperation and communications among operations staff. Two variables could influence these psychological factors. One is the degree of responsibility for a plant's nuclear reactors. The individuals with the greatest responsibility are licensed by the US Nuclear Regulatory Commission (NRC). There are also individuals with less direct responsibilities who are not licensed. A second variable is the operating status of the plant, whether or not the plant is currently producing electricity. Relative to ensuring the safe operation of nuclear power plants, these data suggest a positive view of licensed operators. Of interest are the greater stress scores in the licensed staff of the operating plant in contrast with their peers in the nonoperating plant

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  12. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  13. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  15. Licensing operators for commercial nuclear power plants

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1988-01-01

    The human element in the operation of commercial nuclear power plants is of utmost importance. Not only must the operators be technically competent in the execution of numerous complicated tasks, they must be capable of working together as a team to diagnose dynamic plant conditions to ensure that their plants are operated safely. The significance of human interaction skills and crew communications has been demonstrated most vividly in TMI and Chernobyl. It follows that the NRC must retain its high standards for licensing operators. This paper discusses activities and initiatives being employed by the NRC to enhance the reliability of its licensing examinations, and to build a highly qualified examiner work force

  16. HTR-PM Safety requirement and Licensing experience

    International Nuclear Information System (INIS)

    Li Fu; Zhang Zuoyi; Dong Yujie; Wu Zongxin; Sun Yuliang

    2014-01-01

    HTR-PM is a 200MWe modular pebble bed high temperature reactor demonstration plant which is being built in Shidao Bay, Weihai, Shandong, China. The main design parameters of HTR-PM were fixed in 2006, the basic design was completed in 2008. The review of Preliminary Safety Analysis Report (PSAR) of HTR-PM was started in April 2008, completed in September 2009. In general, HTR- PM design complies with the current safety requirement for nuclear power plant in China, no special standards are developed for modular HTR. Anyway, Chinese Nuclear Safety Authority, together with the designers, developed some dedicated design criteria for key systems and components and published the guideline for the review of safety analysis report of HTR-PM, based on the experiences from licensing of HTR-10 and new development of nuclear safety. The probabilistic safety goal for HTR-PM was also defined by the safety authority. The review of HTR-PM PSAR lasted for one and a half years, with 3 dialogues meetings and 8 topics meetings, with more than 2000 worksheets and answer sheets. The heavily discussed topics during the PSAR review process included: the requirement for the sub-atmospheric ventilation system, the utilization of PSA in design process, the scope of beyond design basis accidents, the requirement for the qualification of TRISO coating particle fuel, and etc. Because of the characteristics of first of a kind for the demonstration plant, the safety authority emphasized the requirement for the experiment and validation, the PSAR was licensed with certain licensing conditions. The whole licensing process was under control, and was re-evaluated again after Fukushima accident to be shown that the design of HTR-PM complies with current safety requirement. This is a good example for how to license a new reactor. (author)

  17. Impact of New Radiation Safety Standards on Licensing Requirements of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Strohal, P.; Subasic, D.; Valcic, I.

    1996-01-01

    As the outcomes of the newly introduced safety philosophies, new and more strict safety design requirements for nuclear installation are expected to be introduced. New in-depth defence measures should be incorporated into the design and operation procedure for a nuclear installation, to compensate for potential failures in protection or safety measures. The new requirements will also apply to licensing of NPP's operation as well as to licensing of nuclear sites, especially for radioactive waste disposal sites. This paper intends to give an overview of possible impacts of new internationally agreed basic safety standards with respect to NPP and related technologies. Recently issued new basic safety standards for radiation protection are introducing some new safety principles which may have essential impact on future licensing requirements regarding nuclear power plants and radioactive waste installations. These new standards recognize exposures under normal conditions ('practices') and intervention conditions. The term interventions describes the human activities that seek to reduce the existing radiation exposure or existing likelihood of incurring exposure which is not part of a controlled practice. The other new development in safety standards is the introduction of so called potential exposure based on the experience gained from a number of radiation accidents. This exposure is not expected to be delivered with certainty but it may result from an accident at a source or owing to an event or sequence of events of a probabilistic nature, including equipment failures and operating errors. (author)

  18. Selection, training, qualification and licensing of Three Mile Island reactor operating personnel

    International Nuclear Information System (INIS)

    Eytchison, R.M.

    1980-01-01

    The various programs which were intended to staff Three Mile Island with competent, trained operators and supervisors are reviewed. The analysis includes a review of the regulations concerning operator training and licensing, and describes how the requirements were implemented by the NRC, Metropolitan Edison Company, and Babcock and Wilcox Company. Finally the programs conducted by these three organisations are evaluated. (U.K.)

  19. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Science.gov (United States)

    2013-05-20

    ... Facility Operating License No. R-103 AGENCY: Nuclear Regulatory Commission. ACTION: License renewal... the renewal of Facility Operating License No. R-103 (``Application''), which currently authorizes the... application for the renewal of Facility Operating License No. R-103, which, currently authorizes the licensee...

  20. Simulator training and licensing examination for nuclear power station operator

    International Nuclear Information System (INIS)

    Xu Pingsheng

    2007-01-01

    For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear Power Station Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced from EDF (electricite De France), some new courses are developed and the improvement on the initial training, retaining courses, the technical support and the experience feedback by using the simulator is done also. (authors)

  1. 22 CFR 129.6 - Requirement for license/approval.

    Science.gov (United States)

    2010-04-01

    ... LICENSING OF BROKERS § 129.6 Requirement for license/approval. (a) No person may engage in the business of... member country of that Organization, Australia, Japan, New Zealand, or South Korea, except in the case of...

  2. Technological evaluation for the extension of the operation license to the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Arganis J, C. R.; Medina A, A. L.

    2010-01-01

    At the present time one of the tendencies in the nuclear industry is the renovation of operation licenses of the nuclear power plants, with the purpose of prolonging their operation 20 years more than the time settled down in their original license, which is of 30 years for the case of the nuclear power plant of Laguna Verde. This allows the electric power generation for a major period of time and to a relatively low price, giving this way a bigger competitiveness to the power stations of nuclear power. However, to request the license extension of the nuclear power plant requires to get ready the documentation and necessary studies for: to maintain a high level of security, to optimize the operation, maintenance and service life of the structures, systems and components, to maintain an acceptable level of performance, to maximize the recovery of the investment about the service of the nuclear power plant and to preserve the sure conditions for a major operation period at the license time. This paper describes the studies conducted by the Materials Technology Department of the Instituto Nacional de Investigaciones Nucleares (ININ) to substantiate the required documentation for obtaining the extension of operating license of the nuclear power plant. These studies are focused mainly in the reactor pressure vessels of both units, as well as in the deposit of noble metals and the influence of the sludges (crud s) in this deposit. (Author)

  3. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2015-09-01

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  4. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  5. Personality Factors and Nuclear Power Plant Operators: Initial License Success

    Science.gov (United States)

    DeVita-Cochrane, Cynthia

    Commercial nuclear power utilities are under pressure to effectively recruit and retain licensed reactor operators in light of poor candidate training completion rates and recent candidate failures on the Nuclear Regulatory Commission (NRC) license exam. One candidate failure can cost a utility over $400,000, making the successful licensing of new operators a critical path to operational excellence. This study was designed to discover if the NEO-PI-3, a 5-factor measure of personality, could improve selection in nuclear utilities by identifying personality factors that predict license candidate success. Two large U.S. commercial nuclear power corporations provided potential participant contact information and candidate results on the 2014 NRC exam from their nuclear power units nation-wide. License candidates who participated (n = 75) completed the NEO-PI-3 personality test and results were compared to 3 outcomes on the NRC exam: written exam, simulated operating exam, and overall exam result. Significant correlations were found between several personality factors and both written and operating exam outcomes on the NRC exam. Further, a regression analysis indicated that personality factors, particularly Conscientiousness, predicted simulated operating exam scores. The results of this study may be used to support the use of the NEO-PI-3 to improve operator selection as an addition to the current selection protocol. Positive social change implications from this study include support for the use of a personality measure by utilities to improve their return-on-investment in candidates and by individual candidates to avoid career failures. The results of this study may also positively impact the public by supporting the safe and reliable operation of commercial nuclear power utilities in the United States.

  6. 7 CFR 46.3 - License required.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE MARKETING OF PERISHABLE AGRICULTURAL COMMODITIES REGULATIONS (OTHER... considered to result in separate firms and, therefore, do not require separate licenses. ...

  7. Nuclear fuel licensing requirements: present status and future trends

    International Nuclear Information System (INIS)

    Gantchev, T.; Vitkova, M.; Gorinov, I.; Datcheva, D.; Rashkova, N.

    2001-01-01

    The nuclear fuel licensing process must be directed to establishing of criteria for licensing (fuel safety criteria) and relationship between safety limits, technical specifications and operational conditions. This paper discusses the fuel safety criteria as used by NRC and Russian vendor. A survey on the available fuel behavior, modeling and related computer codes is given with respect to help the licensing process including new safety features of general changes in fuel design and operational conditions. Several types of computer codes that are used in safety analysis are sensitive to fuel-related parameters. The need for further code development and verification has been stated on many occasions: new design elements, such as different cladding materials, higher burnup, different fuel microstructure and use of MOX fuel can affect the performance of these codes. Regulatory inspection practices during operation and refueling in different countries are also shown. Future trends are discussed in particular with regard to the coming high burnup and to new core management schemes

  8. 21 CFR 558.4 - Requirement of a medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Requirement of a medicated feed mill license. 558... Provisions § 558.4 Requirement of a medicated feed mill license. (a) A feed manufacturing facility must possess a medicated feed mill license in order to manufacture a Type B or Type C medicated feed from a...

  9. Survey of foreign reactor operator qualifications, training, and staffing requirements. Final report

    International Nuclear Information System (INIS)

    Au, M.L.; DiSalvo, R.; Merschoff, E.

    1982-05-01

    The report is a compilation of the data obtained from a survey of foreign nuclear power plant operator requirements. Included among the considerations are: (1) shift staffing; (2) operator eligibility; (3) operator training programs; (4) operator licensing or certification; and (5) operator retraining. The data obtained from this survey are presented in matrix form and contrasted with U.S. requirements

  10. 78 FR 17450 - Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc...

    Science.gov (United States)

    2013-03-21

    ... License Renewal, Operating License SUA-1341, Uranium One USA, Inc., Willow Creek Uranium In Situ Recovery.... SUA- 1341 to Uranium One USA, Inc. (Uranium One) for its Willow Creek Uranium In Situ Recovery (ISR... Commission License No. SUA-1341 For Uranium One USA, Inc., Irigaray and Christensen Ranch Projects (Willow...

  11. 14 CFR 171.273 - Maintenance and operations requirements.

    Science.gov (United States)

    2010-01-01

    ... authorized persons. (3) FCC licensing requirements for operations and maintenance personnel. (4) Posting of..., with a maximum corrective maintenance time of not greater than 1.5 hours. This measure applies to... than 1,500 hours. This measure applies to unscheduled outages, out-of-tolerance conditions, and...

  12. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  13. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  14. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  15. Operating reactors licensing actions summary. Vol. 4, No. 2

    International Nuclear Information System (INIS)

    1984-04-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  16. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  17. 47 CFR 13.201 - Qualifying for a commercial operator license or endorsement.

    Science.gov (United States)

    2010-10-01

    ... class of license or endorsement specified below must pass, or otherwise receive credit for, the... endorsement. 13.201 Section 13.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS Examination System § 13.201 Qualifying for a commercial operator license or endorsement...

  18. Application and licensing requirements of the Framatome ANP RLBLOCA methodology

    International Nuclear Information System (INIS)

    Martin, R.P.; Dunn, B.M.

    2004-01-01

    The Framatome ANP Realistic Large-Break LOCA methodology (FANP RLBLOCA) is an analysis approach approved by the US NRC for supporting the licensing basis of 3- and 4-loop Westinghouse PWRs and CE 2x4 PWRs. It was developed consistent with the NRC's Code Scaling, Applicability, and Uncertainty (CSAU) methodology for performing best-estimate large-break LOCAs. The CSAU methodology consists of three key elements with the second and third element addressing uncertainty identification and application. Unique to the CSAU methodology is the use of engineering judgment and the Process Identification and Ranking Table (PIRT) defined in the first element to lay the groundwork for achieving the ultimate goal of quantifying the total uncertainty in predicted measures of interest associated with the large-break LOCA. It is the PIRT that not only directs the methodology development, but also directs the methodology review. While the FANP RLBLOCA methodology was generically approved, a plant-specific application is customized in two ways addressing how the unique plant characterization 1) is translated to code input and 2) relates to the unique methodology licensing requirements. Related to the former, plants are required by 10 CFR 50.36 to define a technical specification limiting condition for operation based on the following criteria: 1. Installed instrumentation that is used in the control room to detect, and indicate, a significant abnormal degradation of the reactor coolant pressure boundary. 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a

  19. Licensing requirements regarding the qualification of operating personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-01-01

    The legal requirements regarding the qualifications of operating personnel in nuclear power plants in the Federal Republic of Germany are outlined as in article 7 of the Atomic Energy Act. For the responsible operating personnel the requisite competence and reliability are legally required; for subordinate personnel the law requires only the necessary knowledge. The requisite competence and the necessary knowledge have been further specified in a set of guidelines by the authorities; work on specification of reliability requirements is under way. Essential elements of the requisite competence of responsible operating personnel are their professional qualification, their safety-related knowledge, their abilities, their practical experience, and - for the responsible shift personnel - their nuclear, plant-related training as well as a written and oral examination. Requalification is indispensible for keeping the requisite competence on a level in accordance with the current state of science and technology. Facts concerning the personal reliability of the responsible operating personnel are assessed by the competent authorities on the basis of information available at other state institutions. For the responsible shift personnel, physical and psychological fitness are important factors contributing to their reliability. The necessary knowledge subordinate operating personnel must possess with respect to plant safety and safety of the personnel is assured via instruction on safety and via special briefings at the working place. Lack of safety-related knowledge has to be compensated for by assigning an experienced permanent supervisor for each activity in question. Current work on qualification of operating personnel concentrates on training, including simulator training, of responsible shift personnel. (author)

  20. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Science.gov (United States)

    2012-05-03

    ... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...

  1. Licensing procedure and requirements in the FRG

    International Nuclear Information System (INIS)

    Brosche, D.

    1981-01-01

    The investigations of the different dynamic stresses of pressure suppression systems after the Wuergassen incident in 1972 and their theoretical and experimental solutions required an extraordinary effort from all participants of the licensing procedures. As a consequence of these new problems a lot of mathematical models and computer codes had been developed and a lot of experimental work had been performed. Numerous highly qualified scientists and engineers had been involved for a long time in the licensing procedures and innumerable discussions had been necessary. These investigations and discussions had a great influence on the licensing procedures and on the project running. Too pessimistic assumptions and wrong interpretations of experiments led to fictitious problems and a lot of time and money was necessary to overcome these difficulties. Finally at 1977 it could be proved that the construction was able to control stresses so that additional investigations were not necessary. (orig./HP)

  2. 47 CFR 80.13 - Station license required.

    Science.gov (United States)

    2010-10-01

    ... signals using a marine radio operating in the 156-162 MHz band, any type of AIS, any type of EPIRB, and any type of radar installation. All other transmissions must be authorized under a ship station... paragraph (c) of this section, stations in the maritime service must be licensed by the FCC either...

  3. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  4. 76 FR 61391 - Biweekly Notice Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-10-04

    ... ''Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s) should... to be operable in MODES 1, 2, and 3, as well as in MODE 4 when a steam generator (SG) is relied upon... stored diesel fuel oil inventory will require that a 7 day supply be available for each diesel generator...

  5. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    International Nuclear Information System (INIS)

    Jones, K.

    2014-01-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  6. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2014-07-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  7. Origin Licensing Requires ATP Binding and Hydrolysis by the MCM Replicative Helicase

    Science.gov (United States)

    Coster, Gideon; Frigola, Jordi; Beuron, Fabienne; Morris, Edward P.; Diffley, John F.X.

    2014-01-01

    Summary Loading of the six related Minichromosome Maintenance (MCM) proteins as head-to-head double hexamers during DNA replication origin licensing is crucial for ensuring once-per-cell-cycle DNA replication in eukaryotic cells. Assembly of these prereplicative complexes (pre-RCs) requires the Origin Recognition Complex (ORC), Cdc6, and Cdt1. ORC, Cdc6, and MCM are members of the AAA+ family of ATPases, and pre-RC assembly requires ATP hydrolysis. Here we show that ORC and Cdc6 mutants defective in ATP hydrolysis are competent for origin licensing. However, ATP hydrolysis by Cdc6 is required to release nonproductive licensing intermediates. We show that ATP binding stabilizes the wild-type MCM hexamer. Moreover, by analyzing MCM containing mutant subunits, we show that ATP binding and hydrolysis by MCM are required for Cdt1 release and double hexamer formation. This work alters our view of how ATP is used by licensing factors to assemble pre-RCs. PMID:25087873

  8. 12 CFR 564.3 - Appraisals required; transactions requiring a State certified or licensed appraiser.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Appraisals required; transactions requiring a State certified or licensed appraiser. 564.3 Section 564.3 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY APPRAISALS § 564.3 Appraisals required; transactions requiring a State...

  9. Comparison of licensing activities for operating plants designed by Babcock and Wilcox

    International Nuclear Information System (INIS)

    Thoma, J.O.

    1985-01-01

    This report provides a comparison of a number of licensing activities for the operating Babcock and Wilcox (B and W) plants with emphasis on Rancho Seco. The factors selected were a comparison of staff resources expended in FY84, active licensing action reviews, implementation of NUREG-0737 modifications, exemptions to regulations, SALP reports, enforcement actions, and Licensee Event Reports (LERs). The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1)

  10. 77 FR 68155 - The Armed Forces Radiobiology Research Institute TRIGA Reactor: Facility Operating License No. R-84

    Science.gov (United States)

    2012-11-15

    ... Research Institute TRIGA Reactor: Facility Operating License No. R-84 AGENCY: Nuclear Regulatory Commission... considering an application for the renewal of Facility Operating License No. R-84 (Application), which... the renewal of Facility Operating License No. R-84, which currently authorizes the licensee to operate...

  11. Analyses of operating license renewal for nuclear power plants in USA

    International Nuclear Information System (INIS)

    Chiba, Goro

    2007-01-01

    Although the originally-approved operating period for nuclear power plants in the U.S. is 40 years, the operating periods of many plants have been extended by license renewal for another 20 years. On the other hand, in Japan, plant life management is carried out assuming long-term operation of the plant, and the electric power company submits reports, such as aging technology assessment, and receives evaluation by the authorities. In this paper, the situation regarding plant life management was investigated and a Japan-U.S. comparison was made. As a result, differences were found in the procedure, the background, the manpower, the review period, etc. in Japan and the U.S. but there is no difference between Japan and the U.S. in aiming for a check of the integrity of components, assuming long-term operation for 60 years. Moreover, trend analysis using the overseas fault database of INSS examined the effect on the preservation activities of a license renewal. As a result, there is a tendency for license renewal not to be applied for in units in which the number of aging faults increases with the increase in elapsed years. The U.S. license renewal system was considered to be effective in plant life management, and suggested the validity of plant life management in Japan which is employing the equivalent system to the U.S. (author)

  12. Long Term Operation R and D to Investigate the Technical Basis for Life Extension and License Renewal Decisions

    International Nuclear Information System (INIS)

    Gaertner, John

    2012-01-01

    Establishing an improved technical basis for long term operation of existing plants is a nuclear industry priority. The Electric Power Research Institute (EPRI) has responded with a comprehensive Long Term Operation (LTO) Program addressing this need for existing nuclear power plants world-wide. The program supports both the business decisions necessary to achieve high performance operation and the licensing requirements for operation beyond 60 years. The program selects its R and D priorities in a structured and objective way with much industry input to provide useful results for decisions in the 2014 to 2019 time frame. The program is highly collaborative with U.S. Department of Energy (DOE) and with EPRI-member utilities. The R and D portfolio includes materials aging (metals, concrete, and cables), modernization of information and control technology, enhanced safety analysis, advanced fuel design, demonstration plant activities, life cycle management, and identification of aging management program need for subsequent license renewal. The program has focussed stakeholders world-wide on the technical issues of long term operation, and it is on-track to provide practical results for life extension and license renewal decisions. (author)

  13. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  14. 76 FR 62868 - Washington State University; Notice of Issuance of Renewed Facility Operating License No. R-76

    Science.gov (United States)

    2011-10-11

    ...; Notice of Issuance of Renewed Facility Operating License No. R-76 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance of renewed facility operating license No. R- 76. ADDRESSES: You can access.... Nuclear Regulatory Commission (NRC, the Commission) has issued renewed Facility Operating License No. R-76...

  15. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  16. Decommissioning of the nuclear licensed facilities at the Fontenay aux Roses CEA Center; cleanup of nuclear licensed facility 57 and monitoring of operations and operating feedback

    International Nuclear Information System (INIS)

    Estivie, D.; Bohar, M.P.; Jeanjacques, M.; Binet, C.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.

    2008-01-01

    This is a summary of the program for the decommissioning of all the CEA Licensed Nuclear Facilities in Fontenay aux Roses. The particularity of this center is now it is located in a built-up area. It is presented like example the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. It was developed a method applied to establish the multi-annual budget, monitor the progress of operations and integrate, as work continues, the operating feedback. (author)

  17. Nuclear power plant licensing in Canada

    International Nuclear Information System (INIS)

    Tong, J.S.C.; Waddington, J.G.

    1997-01-01

    The Canadian nuclear power plant licensing practice which has evolved over three decades provides a regulatory framework that promotes safe design and operation of CANDU power plants. From the very outset, it recognizes the need for simple and reliable safety systems which are separate from the systems that are normally used to produce electricity. Further, it requires the reliability of safety systems be demonstrated by routine tests during plant operation. Over the three decades, the analysis requirements to demonstrate the performance and reliability of plant systems that have a role in the detection and mitigating of accidents have also evolved. Today's requirements are defined in consultative documents C-6 and C-98. One recurring theme throughout the evolution of the licensing practice is the maxim of prescribing only basic safety requirements and rules so that designers and operators have the freedom to devise the best possible design features and operating practices

  18. Obtaining college credit for licensed operator courses at the Wolf Creek Generating Station

    International Nuclear Information System (INIS)

    Russo, C.W.; Coulthard, R.C.

    1985-01-01

    The presentation examined alternatives to formal college courses as a means to obtain college credit toward a baccalaureate degree for station operations personnel. The focus is on the American Council on Education (ACE-PONSI) program which evaluates and makes credit recommendations for courses sponsored by organizations, like utilities, whose primary function is not education. Significant elements of the licensed operator program were prepared for an ACE-PONSI review and determined to be equivalent to college level nuclear engineering technology course work. The ACE-PONSI evaluation provides a good foundation and a significant amount of the training program evaluation required prior to the INPO accreditation effort

  19. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  20. Basic national requirements for safe design, construction and operation

    International Nuclear Information System (INIS)

    Franzen, L.F.

    1980-01-01

    Nuclear power plants have to be save. Vendors and utilities operating such plants, are convinced that their plants meet this requirement. Who, however, is establishing the safety requirements to be met by those manufacturing and operating nuclear power plants. What are the mechanisms to control whether the features provided assure the required safety level. Who controls whether the required and planned safety features are really provided. Who is eventually responsible for assuring safety after commissioning of a nuclear power plant. These fundamental questions being raised in many discussions on safety and environmental protection are dealt with in the following sections: (1) Fundamental safety requirements on nuclear power plants, in which such items as risk, legal bases and licensing procedure are discussed, (2) Surveillance during construction, in which safety analysis report, siting, safety evaluation, document examination, quality assurance, and commissioning testing are dealt with, (3) Operating tests and conditions in which recurrent inspections, environmental protection during operation, investigation of abnormal occurences and backfitting requirements as reviewed, and (4) Safety philosophy and safety policy to conclude this presentation. The German approach to nuclear safety serves as an example for an effective way of assuring safe nuclear power. (orig.)

  1. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  2. Health requirements for nuclear reactor operators

    International Nuclear Information System (INIS)

    1980-05-01

    The health prerequisites established for the qualification of nuclear reactor operators according to CNEN-NE-1.01 Guidelines Licensing of nuclear reactor operators, CNEN-12/79 Resolution, are described. (M.A.) [pt

  3. Environmental qualification design for NPP refurbishment to comply with revised licensing requirements

    International Nuclear Information System (INIS)

    MacBeth, M. J.; Hemmings, R. L.

    2002-01-01

    Recent Canadian Nuclear Regulatory decisions have imposed Environmental Qualification (EQ) requirements for twenty-four Reactor Building (RB) airlocks at the four-unit Pickering Nuclear Generating Station-B (PNGS-B) facility. This paper describes the EQ modification design work completed by CANATOM-NPM for the problematic aspects for such projects. The airlocks allow RB access while providing a containment boundary and are designed to prevent a potential breach of containment for all analysed station conditions. Each PNGS-B unit has three large equipment airlocks and three smaller personnel airlocks. The airlocks must function under postulated worst-case design basis accident(DBA) conditions for assigned mission durations. The design must ensure that accident conditions cannot spuriously initiate an un-requested door opening. CANATOM-NPM reviewed site data to specify the necessary EQ modifications required to satisfy licensing requirements while providing a correct and complete as-found record of the existing airlock installation. The design team assessed the installed airlocks configuration against environmental qualification requirements to finalize the list of necessary modifications. A comprehensive, cross-discipline review of proposed design changes was completed to identify any further changes required to satisfy the final EQ licensing goal. The design team also conducted a design review of the EQ modification installation strategy to integrate the design deliverables with the installation team requirements while attempting to minimize necessary outage time for EQ modification installations. This project was completed on schedule and within the cost limitations required by the client with comprehensive, high quality final design packages. Overall improvements were realized for OPG system drawings and the electronic documentation of design data. The EQ modifications designed by CANATOM-NPM will ensure the continued operation of the PNGS-B NPP past December 31

  4. 10 CFR 32.26 - Gas and aerosol detectors containing byproduct material: Requirements for license to manufacture...

    Science.gov (United States)

    2010-01-01

    ...: Requirements for license to manufacture, process, produce, or initially transfer. 32.26 Section 32.26 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS... byproduct material: Requirements for license to manufacture, process, produce, or initially transfer. An...

  5. 10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Immediate notification requirements for operating nuclear power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... systems. (8) Emergency ac electrical power systems, including: Emergency diesel generators (EDGs...

  6. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  7. Comparison of the inspection practices in relation to the control room operator and shift supervisor licenses

    International Nuclear Information System (INIS)

    Aro, Ilari; Koizumi, Hiroyoshi; Manzella, Pietro

    1998-01-01

    The CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries In 1996, members of WGIP discussed various ways in which regulatory inspectors look at and evaluate how licenses are given to control room operators and shift supervisors in the Member countries. As a result of these discussions it was proposed to put together a short comparison report on this issue. The CNRA approved work on this at its annual meeting that year. This CNRA/WGIP study concentrates on the regulatory inspection of control room operator competence and authorisation. As noted in the text, fourteen Member countries supplied input by responding to the questionnaire. This report presents a comparison of inspection practices in participating OECD countries relating to control room operator and shift supervisor licenses. The report has been derived from answers to a questionnaire on the basis of guidance given in Appendix 1.1 with the detailed answers being given in Appendix 1. Key questions for this comparison were 'What are the regulatory or licensee requirements for holding and up-keeping a license or authorisation' and 'How does the regulatory body inspect the training and competence of shift teams and individual operators'. The main conclusion from the comparison is that the general practice within the participating countries for ensuring the competence of operators is broadly similar although regulatory practices differ markedly. For example, the regulatory bodies in some countries are actively involved in the examination and licensing process of individual operators whereas other regulatory bodies

  8. New Jersey's license plate decal requirement for graduated driver licenses: attitudes of parents and teenagers, observed decal use, and citations for teenage driving violations.

    Science.gov (United States)

    McCartt, Anne T; Oesch, Nathan J; Williams, Allan F; Powell, Tara Casanova

    2013-01-01

    On May 1, 2010, New Jersey implemented a law requiring teenagers with learner's permits or probationary licenses to display reflective decals on the front and rear license plates when they drive. The current study examined attitudes of parents and teenagers toward this requirement, use of decals, and reported violations and police enforcement of the graduated driver license law. Statewide telephone surveys of representative samples of parents and teenagers were conducted in February to April 2010 and March to June 2011. Use of decals among probationary license holders was observed at 4 high schools in fall 2010 and in spring 2011 and hand-out surveys were distributed. Data on citations issued for violations of the graduated driver license law were obtained. When interviewed in spring 2011, a large majority of parents of probationary license holders, parents of learner's permit holders, and teenagers with probationary licenses disapproved of decals for probationary licenses. About two thirds of both sets of parents and about half of teenagers disapproved of decals for learner's permits. Support for decals for both license types declined significantly from 2010 to 2011. For parents and teenagers alike, opposition was mainly attributed to concern about identifying and/or targeting teenage drivers by other drivers, predators, or police. In 2011, 77 percent of parents of probationary license holders said that their teenagers had decals for the vehicles driven most often; 46 percent said their teenagers always used decals. Fifty-six percent of parents of learner's permit holders said that their teenagers had decals for the vehicles driven most often; 37 percent said that their teenagers always used decals. Teenagers' reported violations of license restrictions either increased or were similar in 2011 compared to 2010. Observed rates of decal use by probationary license holders at high schools in spring 2011 ranged from 24 to 64 percent. The number of statewide citations

  9. The Atomic Energy Control Board requirements for the radioisotope licensing of a radiopharmaceutical facility

    International Nuclear Information System (INIS)

    Kennedy, P.

    1980-01-01

    Items that must be addressed by an applicant for a radioisotope license in Canada are described. Site, design and operating conditions, safety assessment, organization, emergency procedures and operating policies and procedures must be described to the Atomic Energy Control Board (AECB), in support of any license application. All information submitted in support of the application is subject to AECB's policy on public access to that information. (OT)

  10. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  11. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  12. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  13. 77 FR 73684 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-12-11

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... emergency diesel generator, and the stored lube oil inventory will also continue to require that a 7-day supply be available for each diesel generator. The changes are consistent with NRC-approved Technical...

  14. On the reform of nuclear licensing procedures for plants and operation

    International Nuclear Information System (INIS)

    Lecheler, H.

    1977-01-01

    The nuclear licensing procedures require basic reforming. In doing so, there must be a differentiation between (concrete) licensing of plants and (abstract) decisions on site provision. The provision of sites is exercised directly by the diets of the Laender. For this purpose they enact planning laws on sites for nuclear power plants of different sizes. As far as the Federal law is touched upon (especially the Federal act on construction), the Federal legislator has to concede competences to the Laender. No. 6 of section 7 II of the Atomic Energy Act would have to be deleted. The plant licensing procedure is to be limited to a mere safety check-up of a concrete plant. Licensing prerequisites of the Atomic Energy Act are to be made more precise by the Federal legislator, namely by deciding unequivocally the purpose of the law, whether priority is given to promotion or to protection, and by making the enacting of tangible regulations a duty. When these licensing prerequisites exist, the law has to concede the applicant a plain title to licensing. (orig.) [de

  15. Environmental assessment for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    The Atomic Energy Act and Nuclear Regulatory Commission (NRC) regulations provide for the renewal of nuclear power plant operating licenses beyond their initial 40-year term. The Act and NRC regulations, however, do not specify the procedures, criteria, and standards that must be satisfied in order to renew a license. The NRC is promulgating a rule (10 CFR Part 54) to codify such requirements prior to the receipt of applications for license renewal. The NRC has assessed the possible environmental effects of promulgating requirements in 10 CFR Part 54 now rather than employing such requirements in an ad hoc manner in individual licensing actions. The final part 54 rule requires the development of information and analyses to identify aging problems of systems, structures, and components unique to license renewal that will be of concern during the period of extended operation and will not be controlled by existing effective programs. In general, licensee activities for license renewal may involve replacement, refurbishment, inspection, testing, or monitoring. Such actions will be generally be within the range of similar actions taken for plants during the initial operating term. These actions would be primarily confined within the plants with potential for only minor disruption to the environment. It is unlikely that these actions would change the operating conditions of plants in ways that would change the environmental effects already being experienced. Relicensing under existing regulations would also be primarily focused on aging degradation and would likely result in requirements similar to those that will result from relicensing under the final rule

  16. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-27

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... request: The proposed change will delete Function 14, SG [Steam Generator] Water Level--Low, Coincident... capability to shut down the reactor when required on Low--Low Steam Generator water level. The ability to...

  17. 77 FR 67679 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-13

    ... diesel generator surveillance requirements. Margin of safety is related to the ability of the fission... evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2...

  18. Compliance with NRC subsystem requirements in the repository licensing process

    International Nuclear Information System (INIS)

    Minwalla, H.

    1994-01-01

    Section 121 of the Nuclear Waste Policy Act of 1982 requires the Nuclear Regulatory Commission (Commission) to issue technical requirements and criteria, for the use of a system of multiple barriers in the design of the repository, that are not inconsistent with any comparable standard promulgated by the Environmental Protection Agency (EPA). The Administrator of the EPA is required to promulgate generally applicable standards for protection of the general environment from offsite releases from radioactive material in repositories. The Commission's regulations pertaining to geologic repositories are provided in 10 CFR part 60. The Commission has provided in 10 CFR 60.112 the overall post-closure system performance objective which is used to demonstrate compliance with the EPA high-level waste (HLW) disposal standard. In addition, the Commission has provided, in 10 CFR 60.113, subsystem performance requirements for substantially complete containment, fractional release rate, and groundwater travel time; however, none of these subsystem performance requirements have a causal technical nexus with the EPA HLW disposal standard. This paper examines the issue of compliance with the conflicting dual regulatory role of subsystem performance requirements in the repository licensing process and recommends several approaches that would appropriately define the role of subsystem performance requirements in the repository licensing process

  19. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  20. Licensing requirements for nuclear merchant ships in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schafstall, H.-G.

    1978-01-01

    The procedure of approval in the Federal Republic of Germany will be discussed, referring to the participated authorities and organizations. Rules and guidelines relevant for licensing are mentioned in the frame of legal positions. After presentation of general aspects of basic licensing requirements more detailed information is given relative to their accomplishment demonstrated on the German Nuclear Contained Ship NCS-80-Project

  1. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    International Nuclear Information System (INIS)

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented

  2. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented. (JSR)

  3. Atomic Safety and Licensing Board Panel annual report

    International Nuclear Information System (INIS)

    1991-09-01

    In Fiscal Year 1990, The Atomic Safety and Licensing Board Panel (Panel) handled 40 proceedings involving the construction, operation, and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights, and analyzes how the judges and licensing boards of the Panel addressed the wide-ranging issues raised in these proceedings during the year

  4. 47 CFR 97.5 - Station license required.

    Science.gov (United States)

    2010-10-01

    .... (3) A military recreation station license grant. A military recreation station license grant may be... States military recreational premises where the station is situated. The person must not be a... the balance of the license term and the suspension is still in effect, suspended for the balance of...

  5. 78 FR 7816 - Quality Assurance Program Requirements (Operations)

    Science.gov (United States)

    2013-02-04

    ... defined in 10 CFR 50.109 (the Backfit Rule) and is not otherwise inconsistent with the issue finality... or combined licenses. This regulatory guide may be applied to applications for operating licenses and... may access information and comment submissions related to this document, which the NRC possesses and...

  6. 77 FR 7613 - Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108

    Science.gov (United States)

    2012-02-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...

  7. Assessment of specialized educational programs for licensed nuclear reactor operators

    International Nuclear Information System (INIS)

    Melber, B.D.; Saari, L.M.; White, A.S.; Geisendorfer, C.L.; Huenefeld, J.C.

    1986-02-01

    This report assesses the job-relatedness of specialized educational programs for licensed nuclear reactor operators. The approach used involved systematically comparing the curriculum of specialized educational programs for college credit, to academic knowledge identified as necessary for carrying out the jobs of licenses reactor operators. A sample of eight programs, including A.S. degree, B.S. degree, and coursework programs were studied. Subject matter experts in the field of nuclear operations curriculum and training determined the extent to which individual program curricula covered the identified job-related academic knowledge. The major conclusions of the report are: There is a great deal of variation among individual programs, ranging from coverage of 15% to 65% of the job-related academic knowledge. Four schools cover at least half, and four schools cover less than one-third of this knowledge content; There is no systematic difference in the job-relatedness of the different types of specialized educational programs, A.S. degree, B.S. degree, and coursework; and Traditional B.S. degree programs in nuclear engineering cover as much job-related knowledge (about one-half of this knowledge content) as most of the specialized educational programs

  8. The role the safety analysis report and other documents in the licensing procedure in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Albrecht, E.; Ballhaus, S.

    1975-01-01

    Legal requirements for the licensing procedure, requirements for and preparation of licensing documents, authorities and experts participating in the licensing procedure, course of the atomic licensing procedure e.g. application for construction and operation, public hearing, site and concept license, partial licenses. (HP) [de

  9. Ignalina plant licensing process, international co-operation and assistance

    International Nuclear Information System (INIS)

    Bystedt, P.

    1999-01-01

    The challenge for Lithuania as a country with regained independence was to perform a licensing review in a way never done before in the country and in a time schedule that was extremely short. The work included establishing of the licensing base, strengthening the regulatory authority and organising the technical support, establish and implement a safety improvement program, production of the safety case and review of the safety case, and to derive a conclusion regarding whether to issue a licence or not. This was to be done together with other tasks, such as implementation of modifications included in the safety improvement programme at Ignalina, implementation of a new storage for spent fuel and, most important of all, to manage the operational safety at the plant. The achievements are impressive seen in view of the point of start and in view of the time and resources that have been available. Lithuania has put forward a unique safety documentation of an RBMK reactor and presented an in-depth safety evaluation in full openness to Western experts, giving the unique possibility to compare the safety of the Ignalina reactors to Western standards. The co-operation that has been established between Lithuania and Western experts through different assistance programmes is of outmost value, for all involved parties. Co-operation should continue as one element of the challenges for the future

  10. Regulatory framework for nuclear power plant operation

    International Nuclear Information System (INIS)

    Perez Alcaniz, T.; Esteban Barriendos, M.

    1995-01-01

    As the framework of standards and requirements covering each phase of nuclear power plant project and operation developed, plant owners defined their licensing commitments (codes, rules and design requirements) during the project and construction phase before start-up and incorporated regulatory requirements imposed by the regulatory Body during the licensing process prior to operation. This produces a regulatory framework for operating a plant. It includes the Licensing Basis, which is the starting point for analyzing and incorporating new requirements, and for re-evaluation of existing ones. This presentation focuses on the problems of applying this regulatory framework to new operating activities, in particular to new projects, analyzing new requirements, and reconsidering existing ones. Clearly establishing a plant's licensing basis allows all organizations involved in plant operation to apply the requirements in a more rational way. (Author)

  11. Shutdown requirements in licensing of research reactors and consequences for operation

    International Nuclear Information System (INIS)

    Roegler, H.-J.; Stein, J.

    1983-01-01

    Most countries start their nuclear life with the setup of a research reactor. Most countries have at this time no licensing authority established which can act on existing laws, rules and regulations. Thus, most countries have during this starting phase to rely on the regulations fixed by international institutions such as the IAEA (or by national institutions as the former NRC in US, which happens to take place more often from reasons below). This implies a specific responsibility for international regulations since they have to be very clear and unique. Moreover they have to be applicable to all plants they are set forth for and they have to give no unavoidable restrictions on the use of the plant. Additionally some recheck of the rules based on national rules in forth will be of help. The enrichment reduction for research reactors gave frequent cause to look at the existing IAEA-publications for research reactors. They are laid down in the safety series no. 35 edited 1971. I will only discuss here specific parts of these considerations or requirements. Since the authors' personal impressions are that the published considerations are neither that clear nor that less restrictive as necessary the subsequent discussion is carried out. One of the confusing points of the existing IAEA-regulations is the lengthy discussion of reactivity considerations for critical assemblies first, no similar separate discussion for research reactors and a second discussion titled 'control-rod considerations' under the main title 'considerations applying to critical assemblies and research reactor'. This discussion will be restricted to the latter since the critical assemblies with their timely Constance of maximum excess reactivity do not present any problem for all shut-down conditions

  12. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  13. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  14. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  15. 75 FR 52456 - Customs Broker License Examination Individual Eligibility Requirements

    Science.gov (United States)

    2010-08-26

    ... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection 19 CFR Part 111 [USCBP-2008-0059; CBP Dec. 10-28] RIN 1651-AA74 Customs Broker License Examination Individual Eligibility Requirements AGENCY: Customs and Border Protection, Department of Homeland Security. ACTION: Final rule...

  16. 10 CFR 32.61 - Ice detection devices containing strontium-90; requirements for license to manufacture or...

    Science.gov (United States)

    2010-01-01

    ...; requirements for license to manufacture or initially transfer. 32.61 Section 32.61 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS CONTAINING BYPRODUCT MATERIAL... manufacture or initially transfer. An application for a specific license to manufacture or initially transfer...

  17. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  18. 15 CFR 738.4 - Determining whether a license is required.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Determining whether a license is required. 738.4 Section 738.4 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE EXPORT ADMINISTRATION REGULATIONS...

  19. 78 FR 37281 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses

    Science.gov (United States)

    2013-06-20

    ... factors: (1) License renewal will involve nuclear power plants for which the environmental impacts of...) Changes in the environment around nuclear power plants are gradual and predictable. The 1996 GEIS improved... environmental impacts that may occur from renewing commercial nuclear power plant operating licenses; (2...

  20. The licensing process of the design modifications of Cernavoda 2 NPP resulting from the operating experience of CANDU plants

    International Nuclear Information System (INIS)

    Goicea, L.

    2005-01-01

    The CANDU 6 plant now under construction in Cernavoda include over two hundred significant improvements made in order to comply with current codes and standards and licensing requirements relative to the operating CANDU 6 in Romania. These evolutionary improvements are incorporated in CANDU 6 design taking advance of CANDU operating experience, of the designer company research and development and technical advances worldwide in order to further enhance safety, reliability and economics. This paper gives a general idea of the evaluation of the modifications of the Cernavoda 2 nuclear power plant against the design of Cernavoda 1 and states the safety principles and requirements which are the basis for this evaluation. (author)

  1. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  2. WIPP - Pre-Licensing and Operations: Developer and Regulator Perspectives

    International Nuclear Information System (INIS)

    Peake, Tom; Patterson, R.

    2014-01-01

    The Waste Isolation Pilot Plant (WIPP) is a disposal system for defense-related transuranic (TRU) radioactive waste. Developed by the Department of Energy (DOE), WIPP is located in Southeastern New Mexico: radioactive waste is disposed of 2,150 feet underground in an ancient layer of salt with a total capacity of 6.2 million cubic feet of waste. Congress authorized the development and construction of WIPP in 1980 for the express purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States. This paper makes a historical review of the site development, site operations (waste disposal operations started in 1999), communications between US EPA and DOE, the chronology of pre-licensing and pre-operations, the operational phase and the regulatory challenges, and the lessons learned after 12 years of operations

  3. Investment issues in nuclear plant license renewal

    International Nuclear Information System (INIS)

    Eynon, R.T.

    1999-01-01

    A method that determines the operating lives for existing nuclear power plants is discussed. These assumptions are the basis for projections of electricity supply through 2020 reported in the Energy Information Administration's (EIA's) Annual Energy Outlook 1999. To determine if plants will seek license renewal, one must first determine if they will be operating to the end of their current licenses. This determination is based on an economic test that assumes an investment of $150/kW will be required after 30 yr of operation for plants with older designs. This expenditure is intended to be equivalent to the cost that would be associated with any of several needs such as a one0time investment to replace aging equipment (steam generators), a series of investments to fix age-related degradation, increases in operating costs, or costs associated with decreased performance. This investment is compared with the cost of building and operating the lowest-cost new plant over the same 10-yr period. If a plant fails this test, it is assumed to be retired after 30 yr of service. All other plants are then considered candidates for license renewal. The method used to determine if it is economic to apply for license renewal and operate plants for an additional 20 yr is to assume that plants face an investment of $250 million after 40 yr of operation to refurbish aging components. This investment is compared with the lowest-cost new plant alternative evaluated over the same 20 yr that the nuclear plant would operate. If the nuclear plant is the lowest cost option, it is projected to continue to operate. EIA projects that it would be economic to extend the operating licenses for 3.7 GW of capacity (6 units)

  4. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  5. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  6. License plate recognition using DTCNNs

    NARCIS (Netherlands)

    ter Brugge, M.H; Stevens, J.H; Nijhuis, J.A G; Spaanenburg, L; Tavsanonoglu, V

    1998-01-01

    Automatic license plate recognition requires a series of complex image processing steps. For practical use, the amount of data to he processed must be minimized early on. This paper shows that the computationally most intensive steps can be realized by DTCNNs. Moreover; high-level operations like

  7. Foundation for the adequacy of the licensing bases

    International Nuclear Information System (INIS)

    1991-12-01

    The objective of this report is to describe the regulatory processes that assures that any plant-specific licensing bases will provide reasonable assurance that the operation of nuclear power plants will not be inimical to the public health and safety to the end of the renewal period. It is on the adequacy of this process that the Commission has determined that a formal renewal licensing review against the full range of current safety requirements would not add significantly to safety and is not needed to assure that continued operation throughout the renewal term is not inimical to the public health and safety or common defense and security. This document illustrates in general terms how the regulatory process has evolved in major safety issue areas. It also provides examples illustrating why it is unnecessary to re-review an operating plant's basis, except for age-related degradation unique to license renewal, at the time of license renewal. The report is a supplement to the Statement of Considerations for the Nuclear Regulatory Commission's rule (10 CFR Part 54) that established the criteria and standards governing nuclear power plant license renewal

  8. 78 FR 40519 - Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving...

    Science.gov (United States)

    2013-07-05

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2013-0139] Cooper Nuclear Station; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards..., issued to Nebraska Public Power District (the licensee), for operation of the Cooper Nuclear Station (CNS...

  9. Requirements on the mechanical design of reactor systems operating at elevated temperature

    International Nuclear Information System (INIS)

    Schulz, H.; Glahn, M.

    1979-01-01

    The paper presents the contemporary status of the requirements on the mechanical design and analysis developed during the licensing procedure of reactor systems operating at elevated temperature. General requirements for the design at elevated temperature are reviewed. The main proposal is to point out some limit strain criteria which are not included in present design guidelines and codes. The developed strain criteria are used to limit the component deformations in case of power excursions like the Bethe-Tait accident. It is also applicable for loads arising from other faulted conditions. (orig.)

  10. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A.

    2013-01-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  11. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    Energy Technology Data Exchange (ETDEWEB)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A., E-mail: emotta@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2013-07-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  12. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control... Transmitter Control Internal Transmitter Control Systems § 90.473 Operation of internal transmitter control systems through licensed fixed control points. An internal transmitter control system may be operated...

  13. Safety evaluation report related to the full-term operating license for San Onofre Nuclear Generating Station, Unit 1 (Docket No. 50-206)

    International Nuclear Information System (INIS)

    1991-07-01

    The safety evaluation report for the full-term operating license application filed by the Southern California Edison Company and the San Diego Gas and Electric Company has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in San Diego County, California. The staff has evaluated the issues related to the conversion of the provisional operating license to a full-term operating license and concluded that the facility can continue to be operated without endangering the health and safety of the public following the license conversion. 43 refs., 3 figs., 3 tabs

  14. Presentation of reports for licensing of industrial irradiators

    International Nuclear Information System (INIS)

    2000-04-01

    This Regulation refers to the requirements of the Regulation CNEN-NE.6.02. 'Licensing of Radioactive Facilities', expressed in the section 6 related to the information for Previous Approval, in the subsection 7.2 related to the information for the Construction Licensing and in the subsection 9.2, related to the information for the Authorization for operation, for the specific case of industrial irradiators

  15. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  16. Comparison of implementation of selected TMI action plan requirements on operating plants designed by Babcock and Wilcox

    International Nuclear Information System (INIS)

    Thoma, J.O.

    1984-05-01

    This report provides the results of a study conducted by the US Nuclear Regulatory Commission staff to compare the degree to which eight Babcock and Wilcox (B and W) designed licensed nuclear power plants have complied with the requirements in NUREG-0737, Clarification of TMI Action Plan Requirements. The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1). The purpose of this audit was to establish the progress of the TMI-1 licensee, General Public Utilities (GPU) Nuclear Corporation, in completing the long-term requirements in NUREG-0737 relative to the other B and W licensees examined

  17. Licensing of the proposed PBMR-SA

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Henderson, N.R.; Hill, T.F.; Keenan, N.H.; Metcalf, P.E.; Mysenkov, A.

    1997-01-01

    This paper describes the preliminary criteria, which are intended to be used by the South African regulatory authority (CNS), for licensing of the ESKOM proposed - South African high temperature gas-cooled Pebble Bed Modular Reactor (PBMR-SA). The CNS intends to apply the existing CNS licensing approach together with some international design criteria used for advanced reactors as well as international experience gained from the safety evaluation of the MHTGR, THTR, etc. A major requirement to this type of reactor is that it should comply with the current CNS risk criteria and provide, as a minimum, the same degree of protection to the operator, public and environment that is required for the current generation of nuclear reactors. (author)

  18. Safety and licensing requirements in the Republic of South Africa

    International Nuclear Information System (INIS)

    Simpson, D.M.; Langford, E.L.

    1986-01-01

    The principles for licensing of nuclear installations in South Africa are based on the control of mortality risk to the operators of an installation and the population resident in the vicinity of the site. This paper describes the development of this safety philosophy, and the nuclear licensing process used in this country. The structure of the nuclear regulatory function is briefly described, including the respective roles of the Atomic Energy Corporation, Licencing Branch and the Council for Nuclear Safety. The development of risk criteria and quantitative release magnitude-probability criteria for radioactive material is outlined. Tasks that have to be undertaken by a potential waste disposal site licensee before a site licence is issued are described. Once the facility is commissioned periodic monitoring procedures will have to be adopted throughout the lifetime of the facility. The scope of typical monitoring activities is outlined and the ongoing analyses to be performed and the records to be kept are discussed

  19. Atomic Safety and Licensing Board Panel annual report, fiscal year 1989

    International Nuclear Information System (INIS)

    Cotter, B.P. Jr.

    1990-07-01

    In Fiscal Year 1989, the Atomic Safety and Licensing Board Panel (ASLBP) handled 40 proceedings involving the construction, operation and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights and analyzes how the wide-ranging issues raised in these proceedings were addressed by the Judges and Licensing Boards of the ASLBP during the year. 5 figs., 3 tabs

  20. Aging management review for license renewal and plant life management

    International Nuclear Information System (INIS)

    Rinckel, M.A.; Young, G.G.

    2002-01-01

    Full text: United States nuclear power plants are initially licensed for a period of 40-years. The 40-year term, which was established by the Atomic Energy Commission in the 1950s, is believed to be based on engineering judgement and is consistent with the typical amortization schedule for purchasing fossil power plants. Under 10 CFR Part 54, the license renewal rule, additional terms of 20-years may be obtained through the preparation of a license renewal application that must be reviewed and approved by the Nuclear Regulatory Commission (NRC). The license renewal rule requires that applicants perform ageing management reviews on passive long-lived structures and components to demonstrate that ageing will be managed during the period of extended operation (i.e., additional 20 years of operation). ageing of active components, which are excluded from 10 CFR Part 54, is accomplished through the Maintenance Rule, 10 CFR Part 65, using performance-based monitoring. The license renewal rule, 10 CFR Part 54, was initially published in 1991. After significant interaction with the nuclear industry from 1991 through 1994, the NRC revised the rule in 1995 to focus on passive long-lived structures and components. In 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. In March 2000, the NRC approved the application for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the renewal of the operating licenses for the three-unit Oconee nuclear station. The NRC completed these reviews in a timely, predictable, and stable manner. As of February 2002, the NRC has approved renewal of operating licenses for eight nuclear units and has applications under review for 15 more units. Twelve additional companies have notified the NRC of their intention to seek

  1. Social license to operate: case from brazilian mining industry

    Science.gov (United States)

    Santiago, Ana Lúcia F.; Demajorovic, Jacques; Aledo, Antonio

    2015-04-01

    The approach of the Social License to Operate (SLO) emerges as an important element in academic discussions and business practices related to extractive industries. It appears that in productive activities with great potential to produce economic, social and environmental impacts, conventional approaches based on legal compliance no longer sufficient to legitimize the actions of companies and engagement stakeholders. Studies highlight the need of mining activities receiving a SLO "issued" by companies stakeholders, including society, government, non-governmental organizations, media and communities. However, local communities appears as major stakeholders in governance arrangements, by virtue of its proximity to extractive areas and ability to affect the company's results. Stakeholders with unmet expectations can generate conflicts and risks to the company, the knowledge of these expectations and an awareness of company managers of the importance of Social License to Operate (SLO), can generate strategies and mitigating actions to prevent and or minimize possible conflicts. The concept of SLO arises in engineering extractive industry, when you need to respond to social challenges, beyond the usual environmental challenges, technological and management. According to Franks and Cohen (2012) there is a tendency of engineering sectors, sustainability, environmental, safety and especially in risk mappings, treat the technological issues in a neutral manner, separating the technological research projects of social influences. I want to contribute to the advancement of the debate on stakeholder engagement and adopting as focus on the company's relationship with the community, the aim of this study was to understand how a social project held by one of the largest mining companies in Brazil contributed to the process of SLO. This methodological procedure adopted was a qualitative, descriptive, and exploratory interviews with the communities located in rural areas of direct

  2. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  3. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  4. Licensing of MAPLE reactors in Canada

    International Nuclear Information System (INIS)

    Lee, A.G.; Labrie, J.P.; Langman, V.J.

    1999-01-01

    Full text: The Operating Licence for a MAPLE reactor (i.e., a 10 MW(th), pool-type reactor), has been approved by the Atomic Energy Control Board (AECB) on August 16th, 1999. This Operating Licence has been obtained within three years of the initiation of the MDS Nordion Medical Isotopes Reactor (MMIR) project, which entails the design, construction and commissioning of two 10 MW MAPLE reactors at AECL's Chalk River Laboratories. The scope and nature of the information required by the AECB, the licensing process and highlights of the events which led to successfully obtaining the Operating Licence for the MAPLE reactor are discussed. These discussions address all phases of the licensing process (i.e., the environmental assessment in support of siting, the Preliminary Safety Analysis Report, PSAR, in support of design, procurement and construction, the Final Safety Analysis Report, FSAR, in support of commissioning and operations, and the development of suitable quality assurance subprograms for each phase). An overview of some of the unique technical aspects associated with the MAPLE reactors, and how they have been addressed during the licensing process are also provided (e.g., applying CSA N285.0, General Requirements for Pressure-Retaining Systems and Components in CANDU Nuclear Power Plants, to a small, low pressure, low temperature research reactor, confirmation of the performance of the driver fuel via laboratory and/or in-reactor testing, validation of the computer codes used to perform the safety analyses, critical parameter uncertainty assessment, full scale hydraulic testing of the performance of the design, fuel handling, human factors validation, operator training and certification). (author)

  5. Experience in Cuba in the licensing during import, commissioning and operation of an Irradiator LLCo ISOGAMMA

    International Nuclear Information System (INIS)

    Forteza, Yamil Lopez; Reyes, Yolanda Perez; Garcia, Jose R. Quevedo; Molina, Igor I. Sarabia; Gonzalez, Leonel Omarovich; Zubiaur, Omar Cruz

    2013-01-01

    This work presented the experiences during the process of licensing an irradiator ISOGAMMA LLCo model according to the recommendations of the International Atomic Energy (IAEA). Aspects of the safety assessment are detailed, as well as control and verification requirements for radiation safety and security at different stages of the process (import, transportation, installation irradiator loading 60Co sources, commissioning and operation) of irradiator recently installed in Cuba. The results of the evaluation carried a source of reference and consultation necessary for the work of the regulator to consider for similar processes that lie ahead in other facilities irradiation

  6. Safety aspects of nuclear plant licensing in Canada

    International Nuclear Information System (INIS)

    Jennekens, J.H.F.

    1975-01-01

    The legislative authority is laid down in the Atomic Energy Control Act, 1946, declaring atomic energy a matter of national interest and establishing the Atomic Energy Control Board (AECB) as the competent body for regulating all aspects of atomic energy. The Act also vests a Minister designated by the Government with research and exploitation functions; thus, by Ministerial order, Atomic Energy of Canada Limited was established in 1952 as a State-owned company. The Nuclear Liability Act, 1970, channels all liability for nuclear damage to the operator of a nuclear installation and requires him to obtain insurance in the amount of $75 million, part of which may be re-insured by the Government. The licensing requirements comprise the issuance of a site approval, a construction licence and an operating licence. The AECB is assisted in its licensing functions by its Nuclear Plant Licensing Directorate and by the Reactor Safety Advisory Committee co-operating with each other in making extensive safety assessments of a licence application. A site evaluation report, a preliminary safety report and a final safety report are required in relation to the siting, construction and operation of a nuclear power plant. The Canadian reactor safety philosophy is based on the concept of defence in depth, implemented through a multi-step approach, which includes avoidance of malfunctions, provision of special safety systems, periodic inspection and testing, and avoidance of human errors. Specific criteria and principles have evolved in applying this basic safety philosophy and radiation protection standards are derived from international recommendations. Stringent control is exercised over the management of radioactive waste and management facilities must meet the engineering and procedural requirements of AECB before they can be placed in operation. (author)

  7. USNRC licensing process as related to nuclear criticality safety

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1987-01-01

    The U.S. Code of Federal Regulations establishes procedures and criteria for the issuance of licenses to receive title to, own, acquire, deliver, receive, possess, use, and initially transfer special nuclear material; and establishes and provides for the terms and conditions upon which the Nuclear Regulatory Commission (NRC) will issue such licenses. Section 70.22 of the regulations, ''Contents of Applications'', requires that applications for licenses contain proposed procedures to avoid accidental conditions of criticality. These procedures are elements of a nuclear criticality safety program for operations with fissionable materials at fuels and materials facilities (i.e., fuel cycle facilities other than nuclear reactors) in which there exists a potential for criticality accidents. To assist the applicant in providing specific information needed for a nuclear criticality safety program in a license application, the NRC has issued regulatory guides. The NRC requirements for nuclear criticality safety include organizational, administrative, and technical requirements. For purely technical matters on nuclear criticality safety these guides endorse national standards. Others provide guidance on the standard format and content of license applications, guidance on evaluating radiological consequences of criticality accidents, or guidance for dealing with other radiation safety issues. (author)

  8. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  9. Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992

    International Nuclear Information System (INIS)

    1993-09-01

    In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (''the Panel'') handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel's caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel's judges and licensing boards

  10. Economics of license renewal in the U.S. - entergy's perspective

    International Nuclear Information System (INIS)

    Young, Garry G.

    2003-01-01

    License renewal of operating nuclear plants in the United States has become one of the most successful U.S. nuclear regulatory activities in the past few years. In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provided the requirements for an operating nuclear plant to seek license renewal. At that time, many people believed that only a select few operating nuclear plants would pursue license renewal and that most plants would operate for no more than 40 years. By mid-2003, the owners of approximately 52% of the U.S. nuclear fleet of 103 operating nuclear plants have decided to pursue license renewal and more are expected to follow. This change in direction since 1995 can be attributed to the improving economics of U.S. nuclear power plant operation and to the improved regulatory process resulting from the 1995 revision to 10 CFR Part 54. In 2000, Entergy submitted a license renewal application for Arkansas Nuclear One, Unit 1 (ANO-1). This application was the third to be submitted to the NRC at a time when it was still unclear how successful the regulatory process might be. However, less than 17 months later, in June 2001, the NRC granted a renewed operating license for ANO-1 at a total cost of approximately $11 million. Due in part to the ANO-1 license renewal success, Entergy now has tentative plans to pursue license renewal for the entire fleet of operating nuclear power plants. Without license renewal, Entergy's current nuclear fleet capacity of approximately 9,000 MW(e) would begin to decline in 2012. With license renewal, Entergy's nuclear fleet capacity can remain in place until 2032. This projection does not include the expected improvements in capacity due to power uprate that is currently planned. The combination of power uprate and license renewal will add significant economic value to Entergy's nuclear fleet. One of the major factors in strong performance is capacity factor. In 1990, the average

  11. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  12. Finnish experiences on licensing and using of programmable digital systems in nuclear power plants

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.; Heimburger, H.; Hall, L.E.; Manninen, T.

    1993-01-01

    Finnish utility companies, Imatran Voima Oy (IVO) and Teollisuuden Voima (TVO), and the licensing authority, the Finnish Centre for Radiation and Nuclear Safety (STUK), are preparing for a new nuclear power plant in Finland. Plant vendors are proposing programmable digital automation systems for both the safety-related and the operational I and C (instrumentation and control) systems in this new unit. Also in existing plant units the replacement of certain old analog systems with state-of-the-art digital ones will become necessary in the years to come. Licensing of programmable systems for safety critical applications requires a new approach due to the special properties and failure modes of these systems. The major difficulties seem to be in the assessment and quantification of software reliability. The Technical Research Centre of Finland has in co-operation with the authority and the utilities conducted a project (AJA) to develop domestically applicable licensing requirements, guidelines and practices. International standards, guidelines and licensing practices have been analyzed in order to specify national licensing requirements. The paper describes and discusses the findings and experiences of the AJA project so far. The experience in introducing advanced programmable digital control and computer systems in the operating nuclear power plants will be covered briefly. Although these systems are not safety-related but systems of more general interest regarding nuclear safety, some routines regarding the licensing of safety- related systems have been followed. In these backfitting and replacement projects some experience have been gained in how to license safety-related programmable systems. (Author) 31 refs., 2 figs

  13. ISO 14000 and the nuclear licensing

    International Nuclear Information System (INIS)

    Martins, Nadia Soido Falcao

    1999-01-01

    As concern grows for maintaining and improving the quality of the environment and protecting human health, all the world is turning its attention to the potential environmental in pact of their industrial activities. One of the most important contribution in that way is the International Standard ISO 14000 series. In the utilization of nuclear energy, right from the inception, the safety of personnel, environment and the population has been the basic consideration. Over the years well established licenses criteria have been proposed to limit and control the environmental impact of the plant operation and emergencies situation. In this paper are discussed some specific requirements for implementation of the environmental management system specified by ISO 14000 compared to the environmental requirements for nuclear licensing. (author)

  14. 47 CFR 80.177 - When operator license is not required.

    Science.gov (United States)

    2010-10-01

    ...) The radar frequency is determined by a nontunable, pulse type magnetron or other fixed tuned device, and (ii) The radar is capable of being operated exclusively by external controls; (4) An on board..., calibration, and operation of the radar. The installation must be made by, or under the supervision of, the...

  15. Licensed operating reactors status summary report data as of January 31, 1989

    International Nuclear Information System (INIS)

    Schwartz, I.

    1989-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  16. Licensed operating reactors: status summary report, data as of May 31, 1982

    International Nuclear Information System (INIS)

    1982-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. Licensed operating reactors: Status summary report, data as of 02-28-89

    International Nuclear Information System (INIS)

    1989-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactor Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  18. Licensed operating reactors status summary report, data as of December 31, 1988

    International Nuclear Information System (INIS)

    1989-02-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  19. Licensed operating reactors. Status summary report data as of October 31, 1982

    International Nuclear Information System (INIS)

    1982-11-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  20. Licensed operating reactors. Status summary report, data as of 8-31-82

    International Nuclear Information System (INIS)

    1982-09-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  1. Licensed operating reactors: Status summary report data as of 9-30-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices. IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. Licensed operating reactors: Status summary report, data as of 11-30-88

    International Nuclear Information System (INIS)

    1989-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  3. Licensed operating reactors: Status summary report, data as of 11-30-86

    International Nuclear Information System (INIS)

    1987-06-01

    The operating units status report - licensed operating reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  4. Licensed operating reactors: Status summary report, Data as of 08-31-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  5. Regulatory analysis for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    This regulatory analysis provides the supporting information for the final rule (10 CFR Part 54) that defines the Nuclear Regulatory Commission's requirements for renewing the operating licenses of commercial nuclear power plants. A set of four specific alternatives for the safety review of license renewal applications is defined and evaluated. These are: Alternative A-current licensing basis; Alternative B-extension of Alternative A to require assessment and managing of aging; Alternative C -- extension of Alternative B to require assessment of design differences against selected new-plant standards using probabilistic risk assessment; and Alternative D -- extension of Alternative B to require compliance with all new-plant standards. A quantitative comparison of the four alternatives in terms of impact-to-value ratio is presented, and Alternative B is the most cost-beneficial safety review alternative

  6. 78 FR 37850 - Quality Assurance Program Requirements (Operations)

    Science.gov (United States)

    2013-06-24

    ... analysis may be found in ADAMS under Accession No. ML13109A459. NRC's PDR: You may examine and purchase... no current intention to impose this regulatory guide on holders of current operating licenses or...

  7. License renewal demonstration program: NRC observations and lessons learned

    International Nuclear Information System (INIS)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff's observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, open-quotes Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,close quotes to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), open-quotes Requirements for Renewal of Operating Licenses for Nuclear Power Plants.close quotes In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule

  8. MEX04/058 supporting the license renewal of the LVNPP

    International Nuclear Information System (INIS)

    Diaz, A.; Arganis, C.; Viais, J.; Mendoza, G.; Lucatero, M. A.; Contreras, A.

    2010-10-01

    Nuclear power plants in the United States are authorized to operate for 40 years. However, this 40-year period was chosen based on economic considerations and not on technological restrictions or safety aspects. In general, the operation of equipment, systems and components in a nuclear power plant is subject to rigorous maintenance and inspection monitoring under strict surveillance programs throughout their life. In fact, according to the Nuclear Energy Institute, in December 2009, 59 nuclear power plants in the United States had already reached the 40 years of the original operating license and carried out their renewal process, extending their operation for up to 20 more years. These 59 nuclear power plants carried out their renewal process, basing their operation mainly on safety reviews that validated the good working order of systems, structures and components, meeting the technical specifications required, as well as complying with the specific safety provisions for prolonging the use of a operating license. The owner is responsible for showing the Regulatory Agency that it is capable of effectively managing the aging of the systems, structures and components,guaranteeing their good working order during the renewal period. In the specific case of Mexico, Unit 1 of the Laguna Verde Nuclear Power Plant (LVNPP) has an original 30-year license, with almost 20 years of proper operation, for which, in order to request a license extension, it is necessary to begin management activities, which allow for constituting and submitting the license renewal application to the Regulatory Agency in order to continue its commercial operation. This paper presents some of most important activities carried out by Instituto Nacional de Investigaciones Nucleares and LVNPP in the international project MEX04/058, related to Plant Life Management as a support of the beginning of plant license renewal process. (Author)

  9. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  10. The changing shape of U.S. licensing philosophy

    International Nuclear Information System (INIS)

    Remick, F.J.

    1992-01-01

    The shape of U.S. nuclear licensing and regulatory philosophy and process has already changed. The new process requires NRC review and approval of the vendor designs before a prospective utility license applicant purchases the design and begins construction. The new philosophy has resulted from the lessons learned from extensive operating experience accumulated in the United States. New criteria established for judging reactor designs include the capability of future designs to be more tolerant of accidents beyond the traditional design basis events. Qualitative and quantitative goals have been chosen as a guide for allocating resources for regulation of the currently operating plants. The changing shape of nuclear licensing and regulatory philosophy is also a result of economic circumstances in the United States. All will have a better opportunity to take part in the process which is most likely to encourage further development of safe nuclear energy in the United States. (author)

  11. Licensing and Operations of the Clive, Utah Low-Level Containerized Radioactive Waste Disposal Facility- A Continuation of Excellence

    International Nuclear Information System (INIS)

    Ledoux, M. R.; Cade, M. S.

    2002-01-01

    Envirocare's Containerized Waste Facility (CWF) is the first commercial low-level radioactive waste disposal facility to be licensed in the 21st century and the first new site to be opened and operated since the late 1970's. The licensing of this facility has been the culmination of over a decade's effort by Envirocare of Utah at their Clive, Utah site. With the authorization to receive and dispose of higher activity containerized Class A low-level radioactive waste (LLRW), this facility has provided critical access to disposal for the nuclear power industry, as well as the related research and medical communities. This paper chronicles the licensing history and operational efforts designed to address the disposal of containerized LLRW in accordance with state and federal regulations

  12. 75 FR 61116 - Refunds Under the Cable Statutory License

    Science.gov (United States)

    2010-10-04

    ... Copyright Act, before it was amended to allow a cable system to calculate its royalty fees on a community-by... statutory license set forth in Section 111 are required to pay royalty fees to the Copyright Office... the methodology for a cable operator to calculate royalty fees. Cable operators now pay royalty fees...

  13. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  14. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV; Especificacion de los requerimientos para tramitar una licencia de una instalacion independiente de almacenamiento temporal en seco de combustible gastado (ISFSI) en el sitio de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Serrano R, M. L., E-mail: mlserrano@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2015-09-15

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  15. The licensing procedure under Atomic Energy Law

    International Nuclear Information System (INIS)

    Ronellenfitsch, M.

    1983-01-01

    This post-doctoral thesis of 1981 has been updated to include developments in this field up to the year 1983. The author discusses in detail all questions relating to the peaceful uses of nuclear energy in the Federal Republic of Germany, predominantly from the point of view of administrative law. He investigates nuclear energy and its contribution to electricity supplies with a view to other energy sources, renewable energy sources, alternative energy policies, nuclear fuel and the fuel cycle, development of the nuclear industry, nuclear power stations in operation, under construction, or in development. Following a survey of the nuclear controversy, both on the national and the international level, the author reviews the legal system and arising controversies in the Federal Republic of Germany, defining the purpose of this thesis to be the systematic analysis of the available legal instruments, in order to show structural deficiencies in the planning law relating to nuclear power stations, and thus reasons of ambiguities within the licensing procedure. The author studies the following terms and requirements: licensing requirements and licensability, the licensing method and scenario, the legal character of licences, their contents and effects within the stepwise procedure, and due publication. (HSCH) [de

  16. The U.S. Nuclear Regulatory Commission's antitrust review of nuclear power plants: the conditioning of licenses

    International Nuclear Information System (INIS)

    Penn, D.W.; Delaney, J.B.; Honeycutt, T.C.

    1976-04-01

    The 1970 amendments to Section 105 of the Atomic Energy Act require the Nuclear Regulatory Commission to conduct a prelicensing antitrust review of applications for licenses to construct and operate nuclear power plants. The Commission must make a finding as to whether the granting of a license 'would create or maintain a situation inconsistent with the antitrust laws,' and it has the authority to issue or continue a license, to refuse to issue a license, to rescind or amend a license, and to issue a license with conditions that it deems appropriate. This report provides information about the antitrust license conditions that have resulted from the NRC's antitrust review process. The process itself is described and a catalog of the applications requiring antitrust license conditions is presented. For each application, the license conditions are put into the general categories of unit access, transmission services, coordination, and contractual provisions. For completeness, the report also catalogs applications requiring no antitrust license conditions, and lists applications that were exempted from the 1970 amendments, are the subject of litigation, or have been withdrawn

  17. 12 CFR 14.60 - Qualification and licensing requirements for insurance sales personnel.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Qualification and licensing requirements for insurance sales personnel. 14.60 Section 14.60 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF... insurance product or annuity in any part of its office or on its behalf, unless the person is at all times...

  18. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    International Nuclear Information System (INIS)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-01-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  19. Stability in licensing requirements: a technical perspective

    International Nuclear Information System (INIS)

    Szalay, R.A.

    1978-01-01

    The serious difficulties encountered in the licensing procedure for nuclear power plants in the United States have resulted in the elaboration of a Bill on the siting and licensing of nuclear installations for the purpose of reforming the present system. The author fears, however, that this Bill will not reduce the complexity of present regulations and will be unable to reach the object sought which is to reduce the length of the procedure; he analyses the technical and political reasons underlying this situation, and in particular the role of the staff of the Nuclear Regulatory Commission. (NEA) [fr

  20. Licensing and Operations of the Clive, Utah Low-Level Containerized Radioactive Waste Disposal Facility- A Continuation of Excellence

    Energy Technology Data Exchange (ETDEWEB)

    Ledoux, M. R.; Cade, M. S.

    2002-02-25

    Envirocare's Containerized Waste Facility (CWF) is the first commercial low-level radioactive waste disposal facility to be licensed in the 21st century and the first new site to be opened and operated since the late 1970's. The licensing of this facility has been the culmination of over a decade's effort by Envirocare of Utah at their Clive, Utah site. With the authorization to receive and dispose of higher activity containerized Class A low-level radioactive waste (LLRW), this facility has provided critical access to disposal for the nuclear power industry, as well as the related research and medical communities. This paper chronicles the licensing history and operational efforts designed to address the disposal of containerized LLRW in accordance with state and federal regulations.

  1. Technology neutral licensing requirements: have we been successful?

    International Nuclear Information System (INIS)

    Jamieson, T.

    2009-01-01

    The Canadian Nuclear Safety Commission (CNSC) is Canada's nuclear regulator. In preparation for the licensing of the next generation of nuclear reactors in Canada, the CNSC has made major changes in its processes and procedures associated with all aspects of the licensing life cycle. These include: development of key regulatory documents outlining the CNSC expectations for the design and siting of new reactors; creation of applicant guidelines for completing licensing applications; creation of a comprehensive set of review guides, specifying how topics in applications are to be reviewed; performing pre-project design reviews for proposed new reactor technologies; and streamlining processes wherever possible, such as performing the environmental assessment and license to prepare site activities in parallel. The predicted workload associated with the nuclear renaissance in Canada is real. The CNSC is currently performing: 4 pre-project design reviews (for AECL's ACR-1000 and EC-6, Areva's EPR and Westinghouse's AP-1000), has received applications for 4 new builds (at Darlington, Bruce, Nanticoke and in Alberta) and is in the midst of performing the combined environmental assessment and license to prepare site phases for these sites. This is in addition to the work associated with: the licensing of new uranium mines; oversight of the existing reactor fleet; refurbishments at Bruce/Gentilly/Point Lepreau; license renewal for the NRU reactor; and oversight of our general client base of over 5000 licensees. In this presentation, experience to date with these new processes and procedures will be discussed, including: status of the current new build projects; anticipated new activities; lessons learned, especially the technology neutral approach; application to our other licensed activities, including non-power reactors; and work underway to further develop CNSC methods. Qualifications Needed to Design, Construct and Manufacture Nuclear Systems and Equipment, C. Voutsinos

  2. License application approach for the California LLRW disposal facility

    International Nuclear Information System (INIS)

    Gaynor, R.K.; Romano, S.A.; Hanrahan, T.P.

    1990-01-01

    US Ecology, Inc. is the State of California's license designee to site, develop and operate a low-level radioactive waste (LLRW) disposal facility to serve member states of the Southwestern Compact. US Ecology identified a proposed site in the Ward Valley of southeastern California in March 1988. Following proposed site selection, US Ecology undertook studies required to prepare a license application. US Ecology's license application for this desert site was deemed complete for detailed regulatory review by the California Department of Health Services (DHS) in December 1989. By mutual agreement, disposal of mixed waste is not proposed pending the State of California's decision on appropriate management of this small LLRW subset

  3. NRC as referee (reactor licensing following the Three Mile Island accident)

    International Nuclear Information System (INIS)

    Eisenhut, D.G.

    1984-01-01

    In this article, the NRC's licensing director reports on the progress made by US utilities in complying with the key regulations stemming from the Three Mile Island accident. Over 130 items must be improved at more than 65 reactors. The actions taken by France in response to its own analysis of the accident are discussed. New NRC requirements with regard to operational safety, design, and emergency-response capability are outlined. Nearly all the training, or software, items in Nureg-0737 (''Clarification of TMI Action Plan Requirements'') and more than half of the mechanical, or hardware, items have been completed at plants with operating reactors. The Committee to Review Generic Requirements was created to develop means for controlling the number and nature of NRC requirements placed on licensees. Probabilistic risk-assessment techniques were not widely used by the NRC until after the Three Mile Island accident. The NRC has directed licensees and applicants for operating licenses to conduct control-room design reviews to identify and correct human-engineering discrepancies. Includes 2 tables

  4. Management of the licensing of users of radioactive materials should be improved

    International Nuclear Information System (INIS)

    1976-01-01

    Radioactive material licenses are required for manufacturing nuclear fuel for reactors and for industrial, commercial, medical, and educational uses of radioactive materials. This type of license is not for constructing or operating nuclear power reactors and facilities for processing used nuclear fuels. This report discusses the need for better management improvements in the NRC's program for licensing the users. As of December 31, 1974, there were 8,253 active NRC-issued material licenses held by 6,310 licensees. The study reviewed NRC's policies, procedures, and practices, and examined recent evaluations of state programs to identify problems encountered by the states

  5. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  6. 76 FR 45695 - Notice and Recordkeeping for Use of Sound Recordings Under Statutory License

    Science.gov (United States)

    2011-08-01

    ... operating under these licenses are required to, among other things, pay royalty fees and report to copyright... LIBRARY OF CONGRESS Copyright Royalty Board 37 CFR Parts 370 and 382 [Docket No. RM 2011-5] Notice and Recordkeeping for Use of Sound Recordings Under Statutory License AGENCY: Copyright Royalty Board...

  7. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Science.gov (United States)

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  8. Licensed operating reactors. Status summary report data as of December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  9. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  10. Role of cognitive models of operators in the design, operation and licensing of nuclear power plants

    International Nuclear Information System (INIS)

    Rasmussen, J.

    1982-01-01

    Cognitive models of the behavior of nuclear power plant operators - that is, models developed in terms of human properties rather than external task characteristics - are assuming increasingly important roles in plant design, operation and licensing. This is partly due to an increased concern for human decision making during unfamiliar plant conditions, and partly due to problems that arise when modern information technology is used to support operators in complex situations. Some of the problems identified during work on interface design and risk analysis are described. First, the question of categories of models is raised. Next, the use of cognitive models for system design is discussed. The use of the available cognitive models for more effective operator training is also advocated. The need for using cognitive models in risk analysis is also emphasized. Finally, the sources of human performance data, that is, event reports, incident analysis, experiments, and training simulators are mentioned, and the need for a consistent framework for data analysis based on cognitive models is discussed

  11. 75 FR 61521 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2010-10-05

    ... revises the charcoal testing criteria in Technical Specification 5.5.9, ``Ventilation Filter Testing... staffing from two to four, allow in-plant protective actions to be performed by personnel assigned to other functions, and replace a Mechanical Maintenance person with a Non-Licensed Operator. Date of issuance...

  12. 76 FR 39136 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Science.gov (United States)

    2011-07-05

    ... the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested... Generator (SG) Program,'' to exclude a portion of the tubes below the top of the steam generator tubesheet from periodic steam generator tube inspections during Refueling Outage 14 and the subsequent operating...

  13. 76 FR 73727 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-11-29

    ..., Donald C. Cook Nuclear Plant, Unit 2 (DCCNP-2), Berrien County, Michigan; Date of amendment request... Counsel, Indiana Michigan Power Company, One Cook Place, Bridgman, MI 49106. NRC Acting Branch Chief: Thomas J. Wengert. Notice of Issuance of Amendments to Facility Operating Licenses During the period...

  14. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  15. Analysis of license renewal at U.S. Nuclear Power Plants

    International Nuclear Information System (INIS)

    Nagayama, Munehiro

    2017-01-01

    The U.S. NRC had implemented the rules for LR (License Renewal) of NPPs (Nuclear Power Plants) and the LR rules allow plus 20-year operation of NPPs adding to initial 40-year term for reactor license. The U.S. NRC has already issued ROL (Renewed Operating License) for over forty NPPs. The Atomic Energy Act do not limit the number of LR, so the fleet of U.S. Nuclear, including agency, industry and academy, is continuing efforts to develop rules for SLR (Subsequent License Renewal). The framework of SLR rules has been developed and there is a plan of implementation of SLR for a pilot plant on FY 2018. The total operating term of a SLR plant is 80-year. The LR/SLR of NPPs is effective for stable power supply, greenhouse gas suppression, maintenance of technology, and securing employment. These profits will return to society. It is important to maintain required function of SSCs (Structure, System, and Components) for period of long term operation of NPPs. The U.S. fleet has established integrated ageing management strategy and each NPPs is developing their maintenance plans for long term operation. These adequate maintenance plans may enable to achieve good capacity factor of LR applied NPPs. In this report, domestic LR position will be considered by referring the good performance of U.S. NPPs which entered long term operation beyond 40-year and some conditions such as energy security. (author)

  16. Licensed operating reactors: Status summary report: Data as of February 29, 1988

    International Nuclear Information System (INIS)

    1988-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. Conversion to low-enriched fuel in research reactor aspects of licensing the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Jacquemin, J.

    1985-01-01

    Conversion to low-enriched fuel and usage of new developed highly densified fuel in research-reactors will be an essential alteration in operating the reactor. According to the German Energy Act this has to be licensed. here might be some risk to the licensee of an older research-reactor by suspending his operating license because he cannot meet current requirements to be fulfilled or because of a court decision.Disposal of irradiated fuel elements of the new fuel type is a further significant problem which has to be solved before issuing a new license. (author)

  18. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  19. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  20. Licensed operating reactors: Status summary report, Data as of July 31, 1987

    International Nuclear Information System (INIS)

    1987-10-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  1. Licensed operating reactors: Status summary report data as of December 31, 1992

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1993-03-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1992) and cumulative data, usually from the date of commercial operation. ne data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  2. Licensed operating reactors: Status summary report, data as of 07-31-86

    International Nuclear Information System (INIS)

    1986-12-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  3. Licensed operating reactors: status summary report, data as of 6-30-81

    International Nuclear Information System (INIS)

    1981-07-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the U.S. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the U.S. energy situation as a whole

  4. Licensed operating reactors: Status summary report, Data as of May 31, 1987

    International Nuclear Information System (INIS)

    1987-10-01

    The OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  5. Licensed operating reactors: Status summary report, Data as of June 30, 1987

    International Nuclear Information System (INIS)

    1987-07-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  6. Licensed operating reactors: Status summary report, data as of 12-31-89

    International Nuclear Information System (INIS)

    1990-02-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  7. Licensed operating reactors: Status summary report, data as of September 30, 1989

    International Nuclear Information System (INIS)

    1989-12-01

    THE OPERATING UNITS STATUS REPORT -- LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  8. Licensed operating reactors: Status summary report, data as of August 31, 1987

    International Nuclear Information System (INIS)

    1987-12-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  9. Licensed operating reactors: Status summary report, Data as of October 31, 1987

    International Nuclear Information System (INIS)

    Schwartz, I.

    1987-12-01

    The operating units status report - licensed operating reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  10. Licensed operating reactors: Status summary report, data as of 9-30-87

    International Nuclear Information System (INIS)

    1987-10-01

    The OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  11. Licensed operating reactors: Status summary report, Data as of 2-28-87

    International Nuclear Information System (INIS)

    1987-10-01

    The Operating Units Status Report- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  12. Issues related to the licensing of final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Medici, M.A.; Alvarez, D.E.; Lee Gonzales, H.; Piumetti, E.H.; Palacios, E.

    2010-01-01

    The licensing process of a final disposal facility for radioactive waste involves the design, construction, pre-operation, operation, closure and post closure stages. While design and pre-operational stages are, to a reasonable extent, similar to other kind of nuclear or radioactive facilities, construction, operation, closure and post-closure of a radioactive waste disposal facility have unique meanings. As consequence of that, the licensing process should incorporate these particularities. Considering the long timeframes involved at each stage of a waste disposal facility, it is convenient that the development of the project being implemented in and step by step process, be flexible enough as to adapt to new requirements that would arise as a consequence of technology improvements or due to variations in the socio-economical and political conditions. In Argentina, the regulatory Standard AR 0.1.1 establishes the general guideline for the 'Licensing of Class I facilities (relevant facilities)'. Nevertheless, for radioactive waste final disposal facilities a new specific guidance should be developed in addition to the Basic Standard mentioned. This paper describes the particularities of final disposal facilities indicating that a specific licensing system for this type of facilities should be foreseen. (authors) [es

  13. Cause trending analysis for licensing operational events in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Dewei

    2005-01-01

    The human causal factors for all human error licensing operational events on Daya Bay nuclear power station since 1993 to 2003 are categorized, the trend of these causal factors is analyzed. The emphasis is placed on analyzing the deficiencies on complying with and executing regulations and procedures. The results provide directional reference for nuclear power station to improve human performance. (author)

  14. [Radiation protection in medical research : Licensing requirement for the use of radiation and advice for the application procedure].

    Science.gov (United States)

    Minkov, V; Klammer, H; Brix, G

    2017-07-01

    In Germany, persons who are to be exposed to radiation for medical research purposes are protected by a licensing requirement. However, there are considerable uncertainties on the part of the applicants as to whether licensing by the competent Federal Office for Radiation Protection is necessary, and regarding the choice of application procedure. The article provides explanatory notes and practical assistance for applicants and an outlook on the forthcoming new regulations concerning the law on radiation protection of persons in the field of medical research. Questions and typical mistakes in the application process were identified and evaluated. The qualified physicians involved in a study are responsible for deciding whether a license is required for the intended application of radiation. The decision can be guided by answering the key question whether the study participants would undergo the same exposures regarding type and extent if they had not taken part in the study. When physicians are still unsure about their decision, they can seek the advisory service provided by the professional medical societies. Certain groups of people are particularly protected through the prohibition or restriction of radiation exposure. A simplified licensing procedure is used for a proportion of diagnostic procedures involving radiation when all related requirements are met; otherwise, the regular licensing procedure should be used. The new radiation protection law, which will enter into force on the 31st of december 2018, provides a notification procedure in addition to deadlines for both the notification and the licensing procedures. In the article, the authors consider how eligible studies involving applications of radiation that are legally not admissible at present may be feasible in the future, while still ensuring a high protection level for study participants.

  15. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  16. Licensed operating reactors: Status summary report, data as of 07-31-88

    International Nuclear Information System (INIS)

    1988-09-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. Licensed operating reactors: Status summary report, data as of October 31, 1988

    International Nuclear Information System (INIS)

    1988-12-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  18. Licensed operating reactors: Status summary report, data as of August 31, 1988

    International Nuclear Information System (INIS)

    1988-10-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  19. Licensed operating reactors: Status summary report, data as of May 31, 1988

    International Nuclear Information System (INIS)

    Schwartz, I.

    1988-07-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resource Management from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operation units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by the NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  20. Licensed operating reactors status summary report, data as of April 30, 1989

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  1. Licensed operating reactors. Status summary report, data as of 3-31-82

    International Nuclear Information System (INIS)

    1982-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. 76 FR 77565 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-12-13

    ... intervene shall be filed in accordance with the Commission's ''Rules of Practice for Domestic Licensing...- conservative emergency diesel generator fuel oil supply volumes, incorporate portions of Technical... of the associated Technical Specifications to require an adequate emergency diesel generator and...

  3. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  4. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  5. Licensed operating reactors: Status summary report data as of June 30, 1988

    International Nuclear Information System (INIS)

    1988-07-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  6. Licensed operating reactors. Status summary report, data as of April 30, 1982

    International Nuclear Information System (INIS)

    1982-05-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20

    International Nuclear Information System (INIS)

    1996-06-01

    The US Nuclear Regulatory Commission's monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided

  8. 77 FR 33782 - License Amendment To Construct and Operate New In Situ Leach Uranium Recovery Facility; Uranium...

    Science.gov (United States)

    2012-06-07

    ... and Operate New In Situ Leach Uranium Recovery Facility; Uranium One Americas; Ludeman AGENCY: Nuclear... provided the first time that a document is referenced. The Ludeman facility In Situ Leach Uranium Recovery... request to amend Source Material License SUA-1341 to construct and operate a new in situ leach uranium...

  9. MARSSIM guidelines for non-impacted area identification in support of partial site release prior to license termination

    International Nuclear Information System (INIS)

    Parish, D.

    1999-01-01

    Regulations are in place which allow plants undergoing decommissioning to remove obsolete requirements from their licenses. Large buffer areas to the site boundary, needed for emergency planning purposes during power operation, are not required for permanently defueled facilities. It is important that non-impacted areas be removed from license restrictions as soon as possible post shutdown to allow rapid asset recovery and return the large environmental resources these areas represent to beneficial use. License termination surveys are not required for non-impacted areas in accordance with the guidance of US Nuclear Regulatory Commission (NRC) NUREG-1575 (MARSSIM), and NRC Draft Regulatory Guide DG-4006. Thus, such areas do not fall under the license termination requirements of 10CFR50.82 (US Code of Federal Regulations). This report describes methods of classifying areas as non-impacted in accordance with MARRSIM and other NRC guidance, and the licensing options for release of non-impacted areas prior to license termination. The status of Big Rock Point's efforts toward early release of non-impacted areas also is provided. (author)

  10. Reactor licensing process: a status report

    International Nuclear Information System (INIS)

    Long, J.A.

    1977-01-01

    The Nuclear Regulatory Commission (NRC), in its review of applications for licenses to construct and operate nuclear power plants, is required to consider those measures necessary to ensure the protection of the health and safety of the public and the environment. The article discusses the NRC staff procedures and policies for conducting the detailed safety, environmental, and antitrust reviews that provide the basis for these assurances. Included is a discussion of the improvements to the licensing process currently being proposed or implemented to enhance its stability and predictability for the benefit of all involved with the regulation of nuclear power. The views and opinions expressed in the article are those of the author alone and do not represent positions of the NRC

  11. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  12. 77 FR 3386 - Export and Reexport License Requirements for Certain Microwave and Millimeter Wave Electronic...

    Science.gov (United States)

    2012-01-24

    ... microwave ``monolithic integrated circuits'' power amplifiers that meet certain criteria with respect to... packaged microwave ``monolithic integrated circuits'' (MMIC) power amplifiers that meet certain criteria.... 110825537-2038-02] RIN 0694-AF38 Export and Reexport License Requirements for Certain Microwave and...

  13. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  14. Licensing and supervision of nuclear facilities in Finland; Genehmigung und Aufsicht von nuklearen Anlagen in Finnland

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, J. [STUK - Radiation and Nuclear Safety Authority, Helsinki (Finland)

    2006-01-01

    In Finland, the licensing process of all nuclear facilities is specified in the Nuclear Energy Act. The licensing procedure comprises three steps, each of which requires a decision by the government: basic decision, construction permit, and operating license. All licensing decisions are taken upon application to the Ministry of Trade and Industry. The Ministry invites comments and opinions on a broad basis and drafts a statement for the government. The basic decision by the government is political, pre-supposing a positive statement by the Central Office for Nuclear Safety (STUK) and a positive decision by the local government of the planned plant location. The construction permit and the operating license are mainly based on points of nuclear safety. STUK is the independent nuclear supervisory agency with administrative powers; its staff has the technical and scientific competence required for safety assessments and for supervision. STUK operates under the supervision of the Ministry for Social Affairs and Health which, to demonstrate its independence, has no duties in the energy sector and, in addition, supervises STUK in administrative matters, not in scientific and technical decisions. Internal rules of STUK ensure neutrality also of its staff in matters of energy policy. The activities of STUK as a supervisory and licensing authority in Finland are described in detail for the management of spent nuclear fuel and the new Olkiluoto 3 nuclear power plant currently under construction. (orig.)

  15. Experience acquired by Furnas for licensing nuclear power plants

    International Nuclear Information System (INIS)

    Silva, A.J.C. da; Xavier, E.E.

    1986-01-01

    The system for licensing of Almirante Alvaro Alberto Nuclear Power Plant-Unit 1 is presented. The process phases for reactor construction and operation are described: preliminary site approval; bases for safety review; partial construction permits; final construction permits; emission of final report of safety analysis; initial operation license and permanent operation license. (M.C.K.) [pt

  16. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  17. To License or Not to License: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    Directory of Open Access Journals (Sweden)

    Thomas Lonardo

    2008-09-01

    Full Text Available In this paper the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner licensing. The authors conclude that states must differentiate between Private Investigator and Digital Examiner licensing requirements and oversight.

  18. Current status of LTO licensing programme for Bohunice nuclear power plant

    International Nuclear Information System (INIS)

    Borak, J.; Kupca, L.

    2012-01-01

    The objective of long term operation (LTO) licensing programme for Bohunice nuclear power plant is to demonstrate that the relevant structures and components shall perform their functions throughout the entire LTO period during which they shall meet all the relevant safety requirements. All the activities-which should result in utility's request to obtain the licence for LTO-must be performed in line with the relevant legal basis. As of May 2012, the anticipated duration of currently running programme is thirteen months. All relevant documentation, required by the established legal basis, shall be submitted to the licensing authority one year before the Unit 3 design life expiry. (author)

  19. Licensing new nuclear energy plants in the 90s

    International Nuclear Information System (INIS)

    Miller, J.H. III; Bishop, R.W.

    1992-01-01

    This paper reports that the framework for nuclear regulation in the United States was established by Congress in the Atomic Energy Act of 1954 (AEA). Under the AEA, the nuclear power program in the United States was launched with a technology just being developed and a nuclear power industry in its infancy. The regulations fashioned by the Atomic Energy Commission under the AEA took into account the evolving state of the technology and the emerging industry in those formative years. The process required a utility desiring to build and operate a nuclear power plant to obtain two separate licenses: one authorizing construction and one authorizing operation. At the construction permit stage, generally only preliminary design information was available and a construction permit could be issued with as little as ten to fifteen percent of the facility design completed. Thereafter, design completion, along with research and development required to address open technical issues, progressed in tandem with construction in what is fairly characterized as a design-as-you-go process. Only as plant construction approached completion was the adequacy of the final design evaluated in connection with the operating license review process

  20. Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

  1. Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6

    International Nuclear Information System (INIS)

    1995-08-01

    In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (''the Panel'') handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel's caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel's judges and licensing boards

  2. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  3. Demonstrating safety during license renewal should not be a large task

    International Nuclear Information System (INIS)

    Berto, D.S.

    1993-01-01

    The principal regulatory goal related to nuclear power plant operation is to ensure the health and safety of the public. The principal goal of extended plant operation via the license renewal process is also to ensure the health and safety of the public. The license renewal documentation issued by the Nuclear Regulatory Commission (NRC) provides guidance on what will be acceptable to the NRC in a license renewal application to demonstrate that this goal will be met. Application of this guidance is currently open to wide interpretation, with many of the current approaches proving to be extremely costly, complex, and uncertain of acceptability. This paper evaluates the requirements necessary to ensure the continued health and safety of the public during any license renewal term. This evaluation is based on the stated goals of the License Renewal Rule and on the published bases for the Rule. An approach to License Renewal is recommended that: (1) meets the stated goals of the NRC; (2) is consistent with current regulatory practices; and (3) will continue to ensure the health and safety of the public. This recommended approach is also much less costly than other current approaches, and can be easily agreed to by all participants. This approach will meet regulatory goals, while removing the cost and uncertainty obstacles currently being confronted by utilities. Providing a viable approach to license renewal will allow the renewal process to be pursued by utilities. Without such an approach, safe and reliable nuclear power plants will be permanently shut down at the arbitrary 40 year license limit

  4. Clarification of TMI action plan requirements. Requirements for emergency response capability

    International Nuclear Information System (INIS)

    1983-01-01

    This document, Supplement 1 to NUREG-0737, is a letter from D. G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors, applicants for operating licenses, and holders of construction permits forwarding post-TMI requirements for emergency response capability which have been approved for implementation. On October 30, 1980, the NRC staff issued NUREG-0737, which incorporated into one document all TMI-related items approved for implementation by the Commission at that time. In this NRC report, additional clarification is provided regarding Safety Parameter Display Systems, Detailed Control Room Design Reviews, Regulatory Guide 1.97 (Revision 2) - Application to Emergency Response Facilities, Upgrade of Emergency Operating Procedures, Emergency Response Facilities, and Meteorological Data

  5. A Post Licensing Study of Community Effects at Two Operating Nuclear Power Plants. Final Report.

    Science.gov (United States)

    Purdy, Bruce J.; And Others

    In an effort to identify and assess the social, economic, and political effects of nuclear power plant construction and operation upon two host communities (Plymouth, Massachusetts and Waterford, Connecticut), a post-licensing review revealed that the primary impact of the nuclear power plants in both communities was an increase in the property…

  6. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  7. CNRA/CSNI workshop on licensing and operating experience of computer-based I and C systems - Summary and conclusions

    International Nuclear Information System (INIS)

    2002-01-01

    The OECD Workshop on Licensing and Operating Experience of Computer-Based I and C Systems, was sponsored by both the Committee on Nuclear Regulatory Activities (CNRA) and the Committee on the Safety of Nuclear Installations (CSNI) of the OECD Nuclear Energy Agency (NEA). It was organised in collaboration with the Czech State Office for Nuclear Safety (SUJB), the Czech Power Board CEZ a.s., I and C Energo a.s. and the Nuclear Research Institute, Rez near Prague. The objectives of the Workshop were to exchange the experience gained by both the regulators and the industry in different countries in the licensing and operation of computer-based I and C systems, to discuss the existing differences in their licensing approaches in various countries, to consider the safety aspects of their practical use, and to discuss the ways of promoting future international co-operation in the given area. The scope of the Workshop included: - review of the progress made since the CNRA/CSNI workshop which was held in 1996 - current and future regulatory needs and/or requirements for the computer-based I and C systems - progress made in software life cycle activities, including verification and validation, and safety/hazards analysis - benefits of applying the computer-based I and C systems to improve plant performance and safety. The Technical Sessions and Discussion Sessions covered the following topics: Opening Session: Advances made in the use and planning of computer-based I and C systems; Topic 1: National and international standards and guides for computer-based safety systems; Topic 2: Regulatory aspects; Topic 3: Analysis and assessment of digital I and C systems; Topic 4: Software life cycle activities; Topic 4: Experience with applications, system aspects, potential limits and future trends and needs; Final Session: Workshop summary. The workshop provided a unique opportunity for people with experience in licensing, developing, manufacturing, implementing, maintaining or

  8. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  9. Australian Radiation Protection and Nuclear Safety Act 1998. Guide to the Australian radiation protection and nuclear safety licensing framework. 1. ed.

    International Nuclear Information System (INIS)

    1999-03-01

    The purpose of this guide is to provide information to Commonwealth entities who may require a license under the Australian Radiation Protection and Nuclear Safety (ARPANS) Act 1998 to enable them to posses, have control of, use, operate or dispose of radiation sources. The guide describes to which agencies and what activities require licensing. It also addresses general administrative and legal matters such as appeal procedures, ongoing licensing requirements, monitoring and compliance. Applicants are advised to consult the Australian Radiation Protection and Nuclear Safety Act 1998 and accompanying Regulations when submitting applications

  10. Australian Radiation Protection and Nuclear Safety Act 1998. Guide to the Australian radiation protection and nuclear safety licensing framework; 1. ed

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The purpose of this guide is to provide information to Commonwealth entities who may require a license under the Australian Radiation Protection and Nuclear Safety (ARPANS) Act 1998 to enable them to posses, have control of, use, operate or dispose of radiation sources. The guide describes to which agencies and what activities require licensing. It also addresses general administrative and legal matters such as appeal procedures, ongoing licensing requirements, monitoring and compliance. Applicants are advised to consult the Australian Radiation Protection and Nuclear Safety Act 1998 and accompanying Regulations when submitting applications

  11. SAFSTOR and License Renewal: Making Them Coexist

    International Nuclear Information System (INIS)

    Henries, William PE

    2008-01-01

    proximity of Unit 1 to the operating units and the fact that a number of Unit 1 systems are shared with Unit 2. Over the past few decades, additional Unit 1 space (primarily within the turbine building) has been cleaned out and is being used to support the operating Units. The original plan to maintain Unit 1 in a SAFSTOR condition until it could be safely dismantled along with Unit 2 at the end of the Unit 2 operating license in 2012, requires some level of re-thinking now that Units 2 and 3 are applying for renewal of their licenses with the desire to continue operation until the 2033 time frame. The remainder of this paper summarizes the inspections and assessments undertaken by Entergy to investigate and document the condition of Indian Point Unit 1 and the resulting steps taken to assure that it would not pose a threat to the license extension efforts being under taken by Units 2 and 3. In conclusion: the Entergy Indian Point management team has systematically undertaken an effort to ensure the Unit 1 SAFSTOR condition and has implemented programs and procedural controls which will assure that it will continue to be safely maintained and will not impact the continued safe operation of Units 2 and 3 during their license renewal period

  12. Image simulation for automatic license plate recognition

    Science.gov (United States)

    Bala, Raja; Zhao, Yonghui; Burry, Aaron; Kozitsky, Vladimir; Fillion, Claude; Saunders, Craig; Rodríguez-Serrano, José

    2012-01-01

    Automatic license plate recognition (ALPR) is an important capability for traffic surveillance applications, including toll monitoring and detection of different types of traffic violations. ALPR is a multi-stage process comprising plate localization, character segmentation, optical character recognition (OCR), and identification of originating jurisdiction (i.e. state or province). Training of an ALPR system for a new jurisdiction typically involves gathering vast amounts of license plate images and associated ground truth data, followed by iterative tuning and optimization of the ALPR algorithms. The substantial time and effort required to train and optimize the ALPR system can result in excessive operational cost and overhead. In this paper we propose a framework to create an artificial set of license plate images for accelerated training and optimization of ALPR algorithms. The framework comprises two steps: the synthesis of license plate images according to the design and layout for a jurisdiction of interest; and the modeling of imaging transformations and distortions typically encountered in the image capture process. Distortion parameters are estimated by measurements of real plate images. The simulation methodology is successfully demonstrated for training of OCR.

  13. Guidelines to implement the license renewal technical requirements of 10CFR54 for integrated plant assessments and time-limited aging analyses. Final report

    International Nuclear Information System (INIS)

    Lehnert, G.; Philpot, L.

    1995-11-01

    This report documents the initial results of the Nuclear Energy Institute License Renewal Implementation Guideline Task Force over the period August 1994 to July 1995 to develop guidance for complying with technical requirements of 10CFR54. The report also provided a starting point for the development of NEI 95-10, ''Industry Guideline for Implementing the Requirements of 10CCR54-The License Renewal Rule''. Information in this document can be used by utilities to prepare the technical material needed in an application for license renewal (LR) of a nuclear power unit. This guideline provides methods for identifying systems, structures, and components (SSCs) and their intended functions within the scope of license renewal. It identifies structures and components (SCs) requiring aging management review and methods for performing the aging management review. The guideline provides a process for identifying and evaluating time-limited aging analyses

  14. International vision requirements for driver licensing and disability pensions: using a milestone approach in characterization of progressive eye disease

    Directory of Open Access Journals (Sweden)

    Alain M Bron

    2010-11-01

    Full Text Available Alain M Bron1, Ananth C Viswanathan2, Ulrich Thelen3, Renato de Natale4, Antonio Ferreras5, Jens Gundgaard6, Gail Schwartz7, Patricia Buchholz81Department of Ophthalmology, University Hospital, Dijon, France; 2Glaucoma Research Unit, Moorfields Eye Hospital NHS Foundation Trust and Department of Genetics, University College of London Institute of Ophthalmology, London, UK; 3Private Practice, Munster, Germany; 4Ospedale Civile di Monselice, Monselice, Italy; 5Ophthalmology, Miguel Servet University Hospital, Zaragoza, Spain; 6COWI, Kolding, Denmark; 7Wilmer Eye Institute, Johns Hopkins University, Glaucoma Consultants, Baltimore, MD, USA; 8Patricia Buchholz Consulting, Karlsruhe, GermanyObjective: Low vision that causes forfeiture of driver’s licenses and collection of disability pension benefits can lead to negative psychosocial and economic consequences. The purpose of this study was to review the requirements for holding a driver’s license and rules for obtaining a disability pension due to low vision. Results highlight the possibility of using a milestone approach to describe progressive eye disease.Methods: Government and research reports, websites, and journal articles were evaluated to review rules and requirements in Germany, Spain, Italy, France, the UK, and the US.Results: Visual acuity limits are present in all driver’s license regulations. In most countries, the visual acuity limit is 0.5. Visual field limits are included in some driver’s license regulations. In Europe, binocular visual field requirements typically follow the European Union standard of ≥120°. In the US, the visual field requirements are typically between 110° and 140°. Some countries distinguish between being partially sighted and blind in the definition of legal blindness, and in others there is only one limit.Conclusions: Loss of driving privileges could be used as a milestone to monitor progressive eye disease. Forfeiture could be standardized as a

  15. Qualification, training, licensing/authorization and retraining of operating personnel in nuclear power plants. Some requirements and practices commonly shared in the European Community Member States

    International Nuclear Information System (INIS)

    Pele, J.P.

    1987-01-01

    At the end of the fifties a treaty was signed instituting between six countries of the European Community for Atomic Energy, or in brief, Euratom. This treaty, in addition to the Common Market Treaty and the Coal and Steel one, constitutes the legal frame of the European Community which, at present, comprises 12 Member States. A commission, the so-called Commission of the European Communities (or in brief CEC) has to implement the provisions laid down in the treaties. Qualification, training, licensing and re-training of operating personnel have been the subjects of an in-depth exchange of views and information in the frame of the work conducted by the Commission. The evaluation of the regulations and practices in countries of the EC and some other countries having a large nuclear energy program, has led to the identification of some generally valid concepts. This synthesis, made with the assistance of a consultant, is now published under the form of an EUR report (EUR 10981). The main topics addressed within this report are the following: shift staffing and staffing of the control room, personnel selection, qualifications necessary for recruitment, training and retraining, and licensing/authorization

  16. Safety-evaluation report related to renewal of the operating license for the Texas A and M University Research Reactor. Docket No. 50-128, License R-83

    International Nuclear Information System (INIS)

    1983-03-01

    This Safety Evaluation Report for the application filed by the Texas A and M University (Texas A and M) for a renewal of operating license number R-83 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Texas Engineering and Experiment Station of the Texas A and M University and is located on the campus in College Station, Brazos County, Texas. The staff concludes that the TRIGA reactor facility can continue to be operated by Texas A and M University without endangering the health and safety of the public

  17. Methodology to identify, review, and evaluate components for license renewal

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gregor, F.E.; Walker, R.S.

    1988-01-01

    A methodology has been developed to systematically identify, review, and evaluate plant equipment for license renewal. The method builds upon the existing licensing basis, operating history, and accepted deterministic and probabilistic techniques. Use of these approaches provides a focus for license renewal upon those safety-significant systems and components that are not routinely replaced, refurbished, or subject to detailed inspection as part of the plant's existing test, maintenance, and surveillance programs. Application of the method identified the PWR and BWR systems that should be subjected to detailed license renewal review. Detailed examination of two example systems demonstrates the approach. The review and evaluation of plant equipment for license renewal differ from the initial licensing of the plant. A substantial operating history has been established, the licensing basis has evolved from the original one, and plant equipment has been subject to periodic maintenance and surveillance throughout its life. In consideration of these differences, a basis for license renewal is needed. License renewal should be based upon continuation of the existing licensing basis and recognition of existing programs and operating history

  18. 78 FR 67402 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-11-12

    ... and 6.2 use custom language to define the requirements of the regulation. Basis for proposed no... the requirement for organizational independence of the operations, health physics, and quality...

  19. 47 CFR 25.262 - Licensing and domestic coordination requirements for 17/24 GHz BSS space stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing and domestic coordination requirements for 17/24 GHz BSS space stations. 25.262 Section 25.262 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.262...

  20. Challenges in the Licensing of New Nuclear Power Plant, Service Life Extension of Operating Ones (Safeguards-Safety-Security Aspects)

    International Nuclear Information System (INIS)

    Horvath, K.

    2016-01-01

    The Hungarian Atomic Energy Authority (HAEA), as the Hungarian nuclear regulator is faced with dual challenges meant by the licensing of the planned construction of two AES-2006 type nuclear power plant units and the licensing of the service life extension of the existing units that have been operating for more than 30 years. The HAEA has full regulatory competence; its mission is to oversee the safety and security of all the peaceful applications of atomic energy. Accordingly, the licensing scope covers safeguards, safety as well as security. The paper shows the current status of the Hungarian nuclear programme and the future plans, as well as summarizes the regulatory approach followed by HAEA. (author)

  1. Licensing, supervision, retrofitting

    International Nuclear Information System (INIS)

    Steinkemper, H.

    1991-01-01

    The following proposals for the amendment to the Atomic Energy Act are made: the term of provisions against damage and the content and scope of the principle of commensurability should be defined by law. Their concretization should be left to the level of the statutory instruments and technical codes. In usage the scope of application of the subsequent obligation should be approximated to the category of element relevant to licensing. Lability to indemnification for subsequent obligations should be abolished. The need for a backfitting licence in the case of 'substantial' alterations requires a closer definition. A legal obligation should be placed on operators of nuclear reactors to carry out periodical safety checks. (orig./HSCH) [de

  2. 10 CFR 70.23a - Hearing required for uranium enrichment facility.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...

  3. AGING MANAGMENT OF REACTOR COOLANT SYSTEM MECHANICAL COMPONENTS FOR LICENSE RENEWAL

    International Nuclear Information System (INIS)

    SUBUDHI, M.; MORANTE, R.; LEE, A.D.

    2002-01-01

    The reactor coolant system (RCS) mechanical components that require an aging management review for license renewal include the primary loop piping and associated connections to other support systems, reactor vessel, reactor vessel internals, pressurizer. steam generators, reactor coolant pumps, and all other inter-connected piping, pipe fittings, valves, and bolting. All major RCS components are located inside the reactor building. Based on the evaluation findings of recently submitted license renewal applications for pressurized water reactors, this paper presents the plant programs and/or activities proposed by the applicants to manage the effects of aging. These programs and/or activities provide reasonable assurance that the intended function(s) of these mechanical components will be maintained for the period of extended operation. The license renewal application includes identification of RCS subcomponents that are within the scope of license renewal and are vulnerable to age-related degradation when exposed to environmental and operational conditions. determination of the effects of aging on their intended safety functions. and implementation of the aging management programs and/or activities including both current and new programs. Industry-wide operating experience, including generic communication by the NRC, is part of the aging management review for the RCS components. In addition, this paper discusses time-limited aging analyses associated with neutron embrittlement of the reactor vessel beltline region and thermal fatigue

  4. 77 FR 66486 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Science.gov (United States)

    2012-11-05

    ... available; and (iii) the filing has been submitted in a timely fashion based on the availability of the....12 to >= 1.17. The change is required to support the LSCS, Unit 2, Cycle 15, operation. Cycle 15 will be the first cycle of operation with a mixed core containing the following fuel types: Global Nuclear...

  5. Generic evaluation of feedwater transients and small break loss-of-coolant accidents in GE-designed operating plants and near-term operating license applications

    International Nuclear Information System (INIS)

    1980-01-01

    The results are presented of a generic evaluation of feedwater transients, small-break loss-of-coolant accidents (LOCAs), and other TMI-2-related events for General Electric Company (GE)-designed operating plants and near-term operating license applications to confirm or establish the bases for the continued safe operation of the operating plants. The results of this evaluation are presented in this report in the form of a set of findings and recommendations in each of the principal review areas. Additional review of the accident is continuing and further information is being obtained and evaluated. Any new information will be reviewed and modifications will be made as appropriate

  6. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    International Nuclear Information System (INIS)

    1995-04-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  7. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  8. Community engagement as conflict prevention: Understanding the social license to operate

    Science.gov (United States)

    Knih, Dejana

    This thesis examines community engagement as a form of conflict prevention in order to obtain the social license to operate (SLO) in Alberta's oil and gas industry. It does this by answering the question: what are the key elements of the Social License to Operate and how can these elements be applied to community engagement/consultation in a way that prevents conflicts in Alberta's oil and gas industry? The underlying assumption of this thesis is that building good relationships and working collaboratively functions as a form of conflict prevention and that this in turn leads to the SLO. This thesis outlines the key features of both successful community engagement and of the SLO, to provide a guideline for what is needed to obtain the SLO. Data was collected from semi-structured interviews and through a literature review. The data analysis concluded that there are direct parallels between the key elements of effective community engagement and the key elements of the SLO as identified in the interviews. These parallels are: knowing the community, addressing community needs, corporate social responsibility, relationship building, follow through and evidence for what has been done, executive buy-in, excellent communication, and open dialogue, all within a process which is principled (there is trust, understanding, transparency and respect), inclusive, dynamic, flexible, ongoing, and long-term. Moreover, the key elements of effective community engagement and of the SLO identified in the interviews also overlapped with those found in the literature review, with only one exception. The literature review explicitly named early involvement as a key element of both effective community engagement and the SLO, whereas the interview participants only explicitly indicated it as a key factor of community engagement and implied it to be a key element of the SLO.

  9. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  10. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    Pursuant to the Nuclear Energy Act (990/1987), a license holder whose operations result, or have resulted, in the generation of nuclear waste must perform all measures included in the management of nuclear waste and preparation thereof and bear all the costs of nuclear waste management. Under law, spent nuclear fuel is regarded as nuclear waste. According to the amendment made to the Nuclear Energy Act in 1994, nuclear waste generated in Finland must be handled, stored and permanently disposed of in Finland. Nuclear waste generated elsewhere may not be handled, stored and permanently disposed of in Finland. The Finnish nuclear legislation defines spent fuel as nuclear waste and requires that it has to be disposed of in the Finnish bedrock. Over 30 years of systematic R and D has been carried out to develop the repository concept, site selection, technologies, safety assessment and the regulatory approach. Activities are based on the Finnish Government's long term strategies since 1983. The stepwise development and future plans for disposal are presented in Table 1. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act (990/1987) and Decree (161/1988). These licensing steps are: - Decision in Principle (DiP); - Construction License; - Operational License. An Environmental Impact Assessment (EIA) shall be conducted prior to the first authorization step of a major nuclear waste facility. The EIA procedure for the final disposal of spent nuclear fuel from three units of the Olkiluoto nuclear power plant and two units of the Loviisa nuclear power plant was carried out in 1998-1999 and extended to one more unit at Olkiluoto in 2008- 2009. Pursuant to the Nuclear Energy Act, before making the DiP the Government shall ascertain whether the municipality planned as the location of the nuclear facility is in favour of the facility, and ensure that no facts indicating a

  11. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  12. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  13. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  14. Licensed operating reactors status summary report data as of April 30, 1983. Vol. 7, No. 5

    International Nuclear Information System (INIS)

    1983-05-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Licensed operating reactors: status summary report, data as of May 31, 1983. Volume 7, No. 6

    International Nuclear Information System (INIS)

    1983-06-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  16. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  17. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  18. Regulatory licensing, status summary report; Systematic evaluation program

    International Nuclear Information System (INIS)

    1978-01-01

    This document is part of a management information system presenting a logical flow of events that represent the evaluation of 11 of the older operating nuclear reactors. Information collected will be used to determine the degree to which the 11 plants meet current licensing requirements and to develop an overall balanced position concerning any needed backfitting of the facilities and the documentation of the results of such evaluations

  19. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  20. Nuclear fuel licensing procedures in Bulgaria

    Energy Technology Data Exchange (ETDEWEB)

    Harizanov, Y [Komitet za Mirno Izpolzuvane na Atomnata Energiya, Sofia (Bulgaria). Komysia za Biologichni i Selskostopanski Nauki

    1994-12-31

    A brief description of the structure and role of the Committee on the Use of Atomic Energy for Peaceful Purposes (BG) as a main governmental institution responsible for safety atomic energy management is presented. The main documentation and licensing procedures adopted for import, export, operation, storage and transportation of nuclear material including nuclear fuel for NPP are outlined. The corresponding institutions are facing now the urgent need for changing some regulations to meet the requirements of the international treaties and conventions recently signed by Bulgarian authorities. A new version of Atomic Law disposed at the Parliament for adoption is essential for updating the management of NPP in Bulgaria where four WWER-440 and two WWER-1000 are under operation.

  1. Introducing advanced ISI requirements at Paks NPP for supporting the LTO

    International Nuclear Information System (INIS)

    Trampus, P.; Ratkai, S.

    2012-01-01

    The four VVER-440 model 213 units in operation at Paks NPP, Hungary, are facing to approach their licensed term of operation, which is 30 years. To extend the safe operation of the units beyond the original licensed term by additional 20 years belongs to the highest priorities of the owners/operator of MVM Paks NPP. According to the nuclear legislation, a formal license renewal application for the extended period has to be submitted to the Hungarian Atomic Energy Authority. A significant feature of the license renewal process is the demonstration of the effectiveness of the currently applied ageing management program. ISI is an essential part of the ageing management program thus the adequate ISI techniques and the tailor made requirements have to be incorporated in it. To cope with the expectations originating from the LTO at Paks NPP, it was decided to replace the original Soviet based ISI system by the widely applied ASME BPVC Section XI requirements. Additionally, in 2011 a new nuclear regulation was issued in Hungary, in which the ISI requirements have also been changed. This paper intends to present the entire structure of the new Hungarian regulation related to the ISI but mainly focusing on the deviation to the ASME Section XI with the perspective of the licence renewal. (author)

  2. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  3. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  4. A review of healthy condition for reactor operators of NPP

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhu Lixin; Zhou Limin

    2008-01-01

    Physical health is one of fundamental elements and the necessary qualification for holding operator license or senior operator license of a nuclear power plant issued by NNSA. Based upon requirements for healthy qualification of reactor operators in nuclear safety regulations and some new issued regulations, especially some involved national standard (GB), review direction, relevant contents and criteria were described, and some suggestions were provided in this paper. (authors)

  5. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  6. Meeting United States re-licensing requirements related to environmental protection using innovative technologies

    International Nuclear Information System (INIS)

    Taft, E.P.; Winchell, F.C.; Cook, T.C.

    1998-01-01

    Procedure for meeting re-licensing requirements related to environmental protection and an overview of several new and emerging technologies regarding the development of ways to prevent fish passage through hydraulic turbines at hydroelectric power dams is described. Fish mortality and injury has long been a concern in the hydroelectric industry and research and development efforts have been ongoing since the 1970s to prevent fish passage through turbines. Several new and emerging technologies are examined that have the potential for wide-spread cost-effective applications

  7. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  8. 77 FR 30332 - Mr. James Chaisson; Order Prohibiting Involvement in NRC-Licensed Activities

    Science.gov (United States)

    2012-05-22

    ... industrial radiographic operations in accordance with conditions specified therein. The license was... NRC conducted a safety and security inspection of the use of byproduct material for industrial... requirements. Mr. Chaisson chose to store a radiographic exposure device at a leased facility on Elk Street in...

  9. Nuclear power plant simulators for operator licensing and training. Part I. The need for plant-reference simulators. Part II. The use of plant-reference simulators

    International Nuclear Information System (INIS)

    Rankin, W.L.; Bolton, P.A.; Shikiar, R.; Saari, L.M.

    1984-05-01

    Part I of this report presents technical justification for the use of plant-reference simulators in the licensing and training of nuclear power plant operators and examines alternatives to the use of plant-reference simulators. The technical rationale is based on research on the use of simulators in other industries, psychological learning and testing principles, expert opinion and user opinion. Part II discusses the central considerations in using plant-reference simulators for licensing examination of nuclear power plant operators and for incorporating simulators into nuclear power plant training programs. Recommendations are presented for the administration of simulator examinations in operator licensing that reflect the goal of maximizing both reliability and validity in the examination process. A series of organizational tasks that promote the acceptance, use, and effectiveness of simulator training as part of the onsite training program is delineated

  10. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  11. Guidance for the licensing procedure concerning the application of radiographic equipment

    International Nuclear Information System (INIS)

    1987-01-01

    According to article 4 of the Ordinance on the Implementation of Atomic Safety and Radiation Protection dated 11 October 1984 the operation of radiographic equipment has to be licensed. The personnel and material requirements that are to be fulfilled by a licensee prior to commissioning X-ray or gamma equipment, are discussed in detail

  12. 10 CFR 60.140 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... assumed in the licensing review; and (2) Natural and engineered systems and components required for repository operation, or which are designed or assumed to operate as barriers after permanent closure, are... of the natural and engineered elements of the geologic repository to meet the performance objectives...

  13. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-01-01

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  14. Development of transportation operations requirements

    International Nuclear Information System (INIS)

    Grady, S.T.; Best, R.E.; Danese, F.L.; Peterson, R.W.; Pope, R.B.

    1990-01-01

    Transport conditions at various utility sties vary dramatically in terms of characteristics at and near the site, requirements, administrative procedures, and other factors. Continuation of design efforts for the OCRWM transportation operations system requires that the operating requirements for the transportation system -- quantity of fuel per unit time per site -- be identified so that the effect the variations have on the system can be accommodated. The approach outlined in this paper provides for an identification of specific sites, evaluation of shipment capabilities at each site, and integration of the sites into multi-site shipping campaigns to scope the logistics management problem for the transportation operations system. 1 fig., 1 tab

  15. 10 CFR 32.22 - Self-luminous products containing tritium, krypton-85 or promethium-147: Requirements for license...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Self-luminous products containing tritium, krypton-85 or... containing tritium, krypton-85 or promethium-147: Requirements for license to manufacture, process, produce... self-luminous products containing tritium, krypton-85, or promethium-147, or to initially transfer such...

  16. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  17. 10 CFR 63.131 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... are within the limits assumed in the licensing review; and (2) Natural and engineered systems and components required for repository operation, and that are designed or assumed to operate as barriers after... information on those parameters and natural processes pertaining to the geologic setting that may be changed...

  18. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  19. Licensing process for safety-critical software-based systems

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, P. [VTT Automation, Espoo (Finland); Korhonen, J. [VTT Electronics, Espoo (Finland); Pulkkinen, U. [VTT Automation, Espoo (Finland)

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications

  20. Licensing process for safety-critical software-based systems

    International Nuclear Information System (INIS)

    Haapanen, P.; Korhonen, J.; Pulkkinen, U.

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications. Many of the

  1. Teacher License Reciprocity. 50-State Review

    Science.gov (United States)

    Aragon, Stephanie

    2017-01-01

    This policy report defines and provides a 50-state review of teacher license reciprocity, explores how state-specific licensing requirements impact the teacher labor market, and includes examples of national and state efforts to facilitate reciprocity.

  2. The Role of License Renewal in PLiM for U.S. Nuclear Power Plants

    International Nuclear Information System (INIS)

    Young, G.G.

    2012-01-01

    At the 2nd International Symposium on Nuclear Power Plant Life Management (PLiM) in 2007, it was reported that the NRC had approved renewal of operating licenses for 48 nuclear units, which would allow operation for up to 60 years (i.e., an additional 20 years from the original 40-year license term). Of the 104 operating nuclear units in the U.S. in 2007, it was anticipated that almost 100% would eventually pursue license renewal. At that time, it was also concluded that the regulatory process was stable and predictable for license renewal, and that successful PLiM activities were helping to ensure the safety, economic, and political factors in the U.S. remained favorable for continued success with license renewal. The status of license renewal in 2012 is even better than it was in 2007. As of April 2012, the NRC has approved renewal of the operating licenses for 71 nuclear units and has applications under review for 15 more units. In addition, nuclear plant owners of at least 14 more units have announced plans to submit license renewal applications over the next few years. This brings the total of renewed licenses and announced plans for license renewal to 96% of the 104 currently operating nuclear units in the U.S. The prediction that almost 100% would eventually pursue license renewal is assured. This positive trend for long term operation of nuclear power plants in the U.S. is attributed to: (1) the success of PLiM activities in achieving an excellent safety record for the nuclear power industry and in ensuring on-going positive economics for nuclear plant operation, and (2) the stable and predictable regulatory process for license renewal. U.S. efforts are now underway to consider long term operation for more than 60 years and the process of preparing a second round of license renewals for up to 80 years of operation is likely to begin within the next few years. (author)

  3. Safety philosophy and licensing practice in different member states of IAEA: Canada

    International Nuclear Information System (INIS)

    Boyd, F.C.

    1981-01-01

    The lecture will provide an outline of the Canadian nuclear organization and basic characteristics of the CANDU reactor as a background for a brief description of the nuclear power plant licensing process and the safety philosophy followed. The regulatory agency (Atomic Energy Control Board) follows a three step licensing procedure, Site Acceptance, Construction Approval, Operating Licence. Defense in depth is followed as a general safety concept, but is applied in a special way. Completely separate and independant safety systems are required and basic criteria established through reference dose limits for any assumed failure (or initiating event) in any process (operating) system and for any such failure combined with complete failure at any safety system. The application of the Canadian approach in other countries will be mentioned. (orig./RW)

  4. Public perspectives on proposed license renewal regulations for nuclear power plants

    International Nuclear Information System (INIS)

    Ligon, D.; Hughes, A.; Seth, S.

    1991-01-01

    On 17 July 1990, the U.S Nuclear Regulatory Commission (NRC) issued for public comment its proposed rule for renewing the operating licenses of nuclear power plants (55 FR 29043). This solicitation marked the fourth time that NRC has Invited public comments on its efforts to develop regulatory requirements for re licensing nuclear power plants. Previously, NRC solicited public comments on establishing a policy statement on plant life extension, and on the issues and options for license renewal discussed in NUREG-1317. On 13-14 November 1989, NRC held a public workshop where the NRC staff discussed a conceptual approach to the rule and solicited written comments on the regulatory philosophy, conceptual rule, and on certain questions. NRC is taking into account all comments received in its development of the final rule which is scheduled for issuance in the summer of 1991

  5. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain

    International Nuclear Information System (INIS)

    Fernandez, R. A.; Torralbo, J. R.

    2004-01-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  6. Licensing evaluation of CANDU-PHW nuclear power plants relative to U.S. regulatory requirements

    International Nuclear Information System (INIS)

    Erp, J.B. van

    1978-01-01

    Differences between the U.S. and Canadian approach to safety and licensing are discussed. U.S. regulatory requirements are evaluated as regards their applicability to CANDU-PHW reactors; vice-versa the CANDU-PHW reactor is evaluated with respect to current Regulatory Requirements and Guides. A number of design modifications are proposed to be incorporated into the CANDU-PHW reactor in order to facilitate its introduction into the U.S. These modifications are proposed solely for the purpose of maintaining consistency within the current U.S. regulatory system and not out of a need to improve the safety of current-design CANDU-PHW nuclear power plants. A number of issues are identified which still require resolution. Most of these issues are concerned with design areas not (yet) covered by the ASME code. (author)

  7. Regulator process for the authorization of an amendment to the operation license of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Perez, R.; Espinosa V, J.M.; Salgado, J.R.; Mamani, Y.R.

    2005-01-01

    The regulator process by which an authorization is granted from an amendment to the License of Operation of a nuclear power station in Mexico is described. It makes an appointment the effective legal mark, the technical characteristics of the modification, the evaluation process and deposition upon oath of tests and finally the elaboration of the Safety report and the Technical Verdict that is a correspondent for the regulator organism to the Secretary of Energy, the one that in turn is the responsible of granting the amendment the License just as it establishes it the Law. (Author)

  8. Licensed operating reactors. Status summary report as of February 29, 1984. Volume 8, No. 3

    International Nuclear Information System (INIS)

    1984-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement (IE), from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  9. Fuel licensing process for an industrial use. ATF licensing process for an industrial use - Utility's perspective

    International Nuclear Information System (INIS)

    Waeckel, Nicolas

    2013-01-01

    To develop and license a breakthrough nuclear fuel technology for commercial use is becoming challenging. All the former safety analysis design limits (SAFDLs) defined in the 1970's for the standard UO 2 -Zr fuels, might no longer be applicable. Identification of the appropriate safety analysis design limits For each type of innovative fuel, the developers will have to identify and investigate all the possible failure/ruins scenarios (not only those related to severe accidents but also those related to normal operation). In order to save time and to focus on the best options, those failure scenarios (which could be 'killers' for the ATF concept) have to be determined early enough in the development process. Based on the above failure scenarios, the developers will have to propose the licensing limits (and the experimental protocol to determine and to justify them). As mentioned earlier, the licensing limits should not be defined against the accidental conditions only. For the operators, the (good) in-reactor fuel behaviour is crucial. As an example, in the case of the new fuel concepts coming with an outer coating, it is important to include the analysis of the consequences of the loss of this protective outer layer in the licensing process due to a manufacturing defect or an inevitable in-reactor fretting wear. Obviously, the new/specific SAFDLs will have to be endorsed by the regulators (which could be a long process by itself). Identification of a commercial reactor to irradiate the first ATF A commercial NPP is not a material test reactor (MTR); irradiating lead test fuel rods (LTFRs) or lead test assemblies (LTAs) implies strict requirements regarding the manufacturing processes [which should not include chemicals (additives or solvents) potentially incompatible with the nuclear technical specifications], the compatibility with the hosting fuel core (in terms of geometry, enrichment, thermal hydraulic performances, etc.) and the robustness and

  10. Research and development associated with licensing of MHTGR [Modular High Temperature Gas-Cooled Reactor

    International Nuclear Information System (INIS)

    Jones, H.

    1990-01-01

    The Modular High Temperature Gas-Cooled Reactor (MHTGR) currently under development by the US Department of Energy (US-DOE) for commercial applications has top-level goals of producing safe, economical power for the US utility industry. The utility industry has been represented in formulating design and licensing requirements through both a ''Utility User Requirements Document'' and by participating in the DOE system engineering process known as the ''Integrated Approach.'' The result of this collaboration has been to set stringent goals for both the safety and operational reliability of the MHTGR. To achieve these goals, the designer must have access to a more comprehensive data base of properties in several fields of technology than is currently available. A technology development program has been planned to provide this data to the designer in time to support both his design activities and the submittal of formal licensing application documents. The US-DOE has chosen the Oak Ridge National Laboratory (ORNL) to take the lead in planning and executing these technology programs. When completed these will augment the designer's current data base and provide the necessary depth to meet the stringent goals which have been set for the MHTGR. It is worth noting that the goals of safety and operational reliability are complementary, and the data required from the technology development program will be similar. Therefore, the program to support the licensing of the MHTGR is not separate from that required for design, but is a subset of that which meets all the requirements that result from implementing the US-DOE's integrated approach. 38 figs

  11. Algeria schedules onshore licensing round

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Algeria's Sonatrach will conduct its first international onshore exploration licensing round in a move designed to triple drilling activity in the country. A second round will follow next April. Sonatrach plans to drill 200 wells during 1991-95, which will require the current level of 37/year to be almost trebled toward the end of the period. To this end foreign operators are being courted in an open exploration bidding round. Deadline for bid submittal in Nov. 30. Companies may enter singly or in groups to form partnerships with Sonatrach. Foreign licensees will be able to take a maximum 49% of production under Algerian law

  12. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico. Part 2

    International Nuclear Information System (INIS)

    Serrano R, M. de L.

    2013-10-01

    At the present time the operation licenses in force for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) will expire in the year 2020 and 2025 for the Unit-1 and Unit-2, respectively, for which the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) has begun its preparation to assist a solicitude of the licensee to continue the operation of the NPP-L V. The present work has the purpose of defining the steps to continue and to generate the documents that would help in this process, as the normative, guides, procedures, regulations, controls, etc. so that the evaluation process will be effective and efficient, as much for the regulator organ as for the licensee. The advance carried out in the continuation of the conformation of an evaluation process of license renovation solicitude is also exposed, taking like base the requirements established by the CNSNS, the regulator organ of the United States (US NRC), and the IAEA for license renovation solicitude of this type. A summary of the licenses granted from the beginning of commercial operation of the NPP-L V is included, both units and the amendments to these licenses, explaining the reason of the amendment shortly and in the dates they were granted. A brief exposition of the nuclear power plants to world level that have received extension of its operation is included. The normative that can be applied in a life extension evaluation is presented, the evaluation process to continue with the guides of the US NRC, the reach of the evaluation and the minimum information required to the licensee that should accompany to their solicitude. (author)

  13. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  14. Building social license to operate through community engagement: the WUSC-Rio Tinto Alcan partnership in Ghana

    OpenAIRE

    Eaton, Chris

    2016-01-01

    Presenting the case study of the WUSC-Rio Tinto Alcan partnership in Ghana, this article focuses on the benefits and challenges of a multi-stakeholder partnership between an NGO, a mining company, governments and local communities. Strong community empowerment, alignment of multiple stakeholders’ interests, and the contribution of an expert development NGO definitely contributed to the success of the project, while also strengthening Rio Tinto’s social license to operate.

  15. Regulatory quality assurance requirements for the operation of nuclear R and D facilities in Korea

    International Nuclear Information System (INIS)

    Kwon, H.I.; Lim, N.J.

    2006-01-01

    Full text: Korea Atomic Energy Research Institute (KAERI) has many R and D facilities in operation. including HANARO research reactor, radioactive waste treatment facility (RWTF), post-irradiation examination facility (PIEF) and irradiated material test facility (IMEF). Recently. nation-wide interest is focused on the safety and security of major industrial facilities. Safe operation of nuclear facilities is imperative because of the consequence of public disaster by radiological release/contamination, in case of an accident. Recently, Ministry of Science and Technology (MOST) of the Korean government announced amendments of Atomic Energy laws to enforce requirements of the physical protection and radiological emergency. All provisions on nuclear safety regulation and radiation protection are entrusted to the Atomic Energy Act(AEA). The Act is enacted as the main law concerning the safety regulation of nuclear installations, and is supplemented by the Enforcement Decree and Enforcement Regulation of the Act. These Atomic Energy laws include provisions on the construction permission and the operation license of nuclear installations, such as nuclear power reactors, research reactors, nuclear ships, nuclear fuel fabrication facilities, spent fuel treatment facilities, etc. Regulatory requirements for the regulatory inspection and the safety measures for operation are also defined in the laws. The Notice of the MOST prescribes specific issues including regulatory requirements and technical standards, as entrusted by the AEA, the Decree and the Regulation. Detailed QA requirements for nuclear installations are specified differently, depending upon the type of facility. The guidelines for safety reviews and regulatory inspections are developed by the Korea Institute of Nuclear Safety (KINS), which is an exclusive organization for safety regulation of nuclear installations in Korea. In this paper, the context of the Atomic Energy laws were reviewed to confirm the

  16. Quality assurance for nuclear power plants licensing aspect

    International Nuclear Information System (INIS)

    Borovoy, W.F.G.

    1976-02-01

    For the nuclear industry, specific criteria must be implemented to provide sufficient assurance that nuclear plants will be constructed and operated to conform with design, regulatory and code requirements. In Israel the inspections or audits are performed by the IAEC Licensing Division. Local position on ANSI QA standards as well as the eighteen criteria are shown. Lists of American standards are presented. The responsibility for quality assurance is not shared, but reinforced by each responsible unit in the supply chain. (B.G.)

  17. Safety philosophy and licensing practice in different member states of IAEA: Germany, F.R

    International Nuclear Information System (INIS)

    Lahner, K.

    1981-01-01

    The safety philosophy, as the basis of the design of a NPP, will be shown under the aspects of general design rules, requirements by law, reactor safety commission and nuclear or conventional technical standards. Then a discussion of the licensing practise in the Federal Republic of Germany and in the USA will follow for the different stages of conceptual design, construction and operation with special consideration of the example of the NPP Muelheim-Kaerlich. The interrelation between designer and licensing authority, reactor safety commission and technical consultants will be taken into account. (orig./RW)

  18. Transport package maintenance requirements and operations

    International Nuclear Information System (INIS)

    Tyacke, M.J.; Ball, L.J.; Ayers, A.L. Jr.; Hayes, G.R.; Anselmo, A.A.

    1988-01-01

    The NuPac 125-B rail cask, which transports the damaged core debris from Three Mile Island Unit 2 (TMI-2) to the Idaho National Engineering Laboratory (INEL), is the only new spent-fuel rail shipping cask to be licensed in the United States within the last decade. EG ampersand G Idaho, Inc. (EG ampersand G), acting on behalf of the US Department of Energy, is responsible for ensuring that those new casks and rail cars are properly maintained per regulatory requirements. Both the casks and rail cars have comprehensive in-service inspection and preventive maintenance programs, which are more involved than implied by the requirements. The TMI-2 shipping campaign is the most ambitious spent-fuel transport activity being conducted in the nuclear industry. The experience gained in this campaign, as it relates to maintenance of a transport system, should be of interest and have direct applicability to similar shipping activities planned in the years ahead

  19. Opportunistic tri-band carrier aggregation in licensed spectrum for multi-operator 5G hetnet

    Science.gov (United States)

    Maksymuk, Taras; Kyryk, Maryan; Klymash, Mykhailo; Jo, Minho; Romaniuk, Ryszard; Kotyra, Andrzej; Zhanpeisova, Aizhan; Kozbekova, Ainur

    2017-08-01

    Increasing capacity of mobile networks is a real challenge due to rapid increasing of traffic demands and spectrum scarcity. Carrier aggregation technology is aimed to increase the user data rate by combining the throughput of few spectrum bands, even if they are not physically collocated. Utilization of unlicensed Wi-Fi 5 GHz band for mobile transmission opens new perspectives for carrier aggregation due to vast amount of spectrum range, which can be available for aggregation to supplement data rates for end users. There are many solutions proposed to enable mobile data transmission in unlicensed band without disturbing interference for the existing Wi-Fi users. The paper presents a new approach for opportunistic carrier aggregation in licensed and unlicensed band for multi-operator 5G network. It allows multiple network operators to utilize unlicensed spectrum opportunistically if it is not currently used by Wi-Fi or other mobile network operators. Performance of the proposed approach has been simulated in case of two competing operators. Simulation results reveal that applying the proposed method ensures achieving satisfactory performance of carrier aggregation for the case of two network operators.

  20. Evaluation of experience and trends in international co-operation in nuclear safety and licensing

    International Nuclear Information System (INIS)

    Stadie, K.B.; Strohl, P.

    1977-01-01

    The paper traces the development of co-operation in nuclear safety technology between the OECD Member countries which began as early as 1965 and is now organised under the auspices of the Committee on the Safety of Nuclear Installations of the OECD Nuclear Energy Agency. The principal objective is to exchange and evaluate information on relevant R and D and hence broaden the technical basis for decision-making by licensing authorities in the different countries. The membership of the Committee on the Safety of Nuclear Installations combines expertise in nuclear safety R and D and in licensing questions so that licensing procedures in the different countries may be exposed continuously to the influence of overall technological progress. The Committee actively seeks to narrow the differences between administrative procedures and traditional legal practices in Member countries as these affect the licensing of nuclear installations, primarily by assessing and comparing the methods employed. The paper shows how the Committee's working arrangements provide for maximum flexibility: the various co-ordinated programmes are selected after in-depth evaluation of potential areas of priority and are implemented through ad hoc Working Groups, specialist meetings or task forces, or in the form of special studies involving all interested countries. The results, conclusions and recommendations emerging from each programme are reviewed by the Committee before dissemination. Hitherto the greater part of the Committee's activities has been concerned with the safety of light water reactors and related subjects, but more attention is now being given to other topics such as LMFBR safety technology and the safety of fuel cycle facilities, particularly those at the end of the process, the so-called ''back-end'' plants. The paper discusses certain problems and constraints encountered in implementing the programme, some of which stem from Member countries' different degrees of penetration

  1. Economic implications of nuclear plant license renewal in the U.S

    International Nuclear Information System (INIS)

    Smith, L.J.

    2001-01-01

    The NRC and the nuclear industry struggled for many years with the development of a viable license renewal rule. Now that a workable rule appears to have been developed, and the first license renewal applicants have received renewed licenses, the floodgates have opened and a large number of nuclear utilities have announced intentions to seek renewed NRC operating licenses. In this time when profound changes are being experienced in the electric generation markets in the United States, nuclear plant license renewal can have several economic effects that should be considered by utilities prior to the pursuit of an NRC license renewal. This paper examines some of the factors that may be affected by the prospect of an additional 20-year operating life of a nuclear plant. (author)

  2. ONR Licensing and Regulation of a Geological Disposal Facility in the UK

    International Nuclear Information System (INIS)

    Boydon, Frans; Glazbrook, David

    2014-01-01

    Document available in abstract form only. Full text follows: The UK has substantial quantities of waste which has arisen from operation and decommissioning of legacy nuclear plant. While a disposal route for Low Level Waste (LLW) has been in operation in the UK for many years, there is as yet no such route for Higher Activity Waste. The government invited local communities to express an interest in hosting a Geological Disposal Facility (GDF). However, the Scottish government is opposed to deep disposal and proposes long-term interim storage in Scotland. This paper describes the work underway and current progress in developing a GDF for the UK. In particular it describes the current legal system in the UK that enables nuclear facilities to be licensed and the background underpinning licensing of existing disposal facilities. It identifies changes which will be necessary to legislation to enable a GDF to be licensed and work which it is performing in close co-operation with the Environment Agency which operate a permitting regime for environmental aspects. The Office of Nuclear Regulation (ONR) regulates safety, security and transport associated with nuclear sites. This paper focuses on the regulation of safety and radioactive waste. The UK licensing regime is non-prescriptive and proportionate, allowing for a flexible approach to licensing. The licence is not time-limited but is designed to be used from construction, through commissioning for the lifetime of the facility. Under the Nuclear Installations Act 1965 (as amended) ONR may attach licence conditions: - In the interests of safety; or - with respect to the handling, treatment and disposal of nuclear matter. ONR has developed a suite of 36 Licence conditions, which typically require the operator to made 'adequate arrangements' to ensure safety. These arrangements would involve the use of 'hold points' beyond which the operator must not proceed without ONR's agreement. In determining

  3. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  4. Status report on the HFR conversion and re-licensing project

    International Nuclear Information System (INIS)

    Wijtsma, F.G.

    2003-01-01

    In 1999 the HFR license holder (JRC, Petten, the Netherlands) initiated a project to study the conversion of the HFR from HEU to LEU. The first phase of this project consisted of a parametric study to determine the optimum fuel element and control rod design within given boundary conditions such as geometry, density, performance and cycle length. Results of this study are a 22 plates fuel element (550 g 235 U) at a density of 4.8 g.cm -3 and a 17 plates control rod (440 g 235 U). The second phase contains all aspects related to the conversion including a full-scale test irradiation of a prototype LEU element. The actual conversion of the HFR requires a new license. For this reason the re-licensing project has started in 2001. In this context many studies have been performed e.g. Risk Scoping Study, Safety Analyses, TOPA (Technical, Operational, Personnel and Administrative) evaluation. The license application will be based on a new Safety Report and an Environmental Impact Statement and will be submitted to the competent Authorities at the end of October 2003. (author)

  5. Scallop License Limitation Program (SLLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A federal Scallop License Limitation Program (SLLP) license is required onboard any vessel deployed in scallop fisheries in Federal waters off Alaska (except for...

  6. Quality Assurance Requirements and Description

    International Nuclear Information System (INIS)

    Ram Murthy

    2002-01-01

    The Quality Assurance Requirements and Description (QARD) is the principal Quality Assurance (QA) document for the Civilian Radioactive Waste Management Program (Program). It establishes the minimum requirements for the QA program [INTRODUCTION :1p2s (NOT A REQUIREMENT)]. The QARD contains regulatory requirements and program commitments necessary for the development of an effective QA program [INTRODUCTION :1p3s (NOT A REQUIREMENT)]. Implementing documents must be based on, and be consistent with the QARD. The QARD applies to the following: (1) Acceptance of spent nuclear fuel and high-level waste. (2) Transport of spent nuclear fuel and high-level waste. (3) Storage of spent nuclear fuel through receipt of storage cask certification or a facility operating license. (4) Monitored Geologic Repository, including the site characterization activities [Exploratory Studies Facility (ESF) and surface based testing], through receipt of an operating license. (5) High-level waste form development through qualification, production, and acceptance. (6) Characterization of DOE spent nuclear fuel, and conditioning through acceptance of DOE spent nuclear fuel. Section 2.0, Quality Assurance Program, defines in greater detail criteria for determining work subject to the QARD

  7. 77 FR 63343 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-16

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... for an inoperable diesel generator (DG). A commensurate change is also proposed to extend the maximum... alternating current power source (i.e., a supplemental diesel generator) with the capability to power any E...

  8. 13 CFR 107.1900 - Surrender of license.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Surrender of license. 107.1900 Section 107.1900 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Ending Operations as a Licensee § 107.1900 Surrender of license. You may not surrender your...

  9. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Pennsylvania State University

    International Nuclear Information System (INIS)

    1986-01-01

    This Safety Evaluation Report for the application filed by the Pennsylvania State University for a renewal of Operating License R-2 to continue to operate the Pennsylvania State University Breazeale Reactor (PSBR) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located on the campus in University Park, Pennsylvania. On the basis of its technical review, the staff concludes that the reactor facility can continue to be operated by the university without endangering the health and safety of the public or the environment

  10. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  11. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  12. Use of the Legal-Institutional Analysis Model to assess hydropower licensing negotiations

    Science.gov (United States)

    Burkardt, N.; Lamb, B.L.; Lamb, B.L.; Garcia de Jalon, D.; Sabaton, C.; Souchon, Y.; Tamai, N.; Robinette, H.R.; Waddle, T.J.; Brinson, A.

    2003-01-01

    In the United States, the Federal Energy Regulatory Commission (FERC) is responsible for issuing or renewing licenses for hydropower projects owned and operated by power companies. During the licensing process, these companies are required to consult with agencies and other parties that are affected by project operating regimes. Typical participants include state and federal fish and wildlife agencies, environmental interest groups, and the FERC. One of the most difficult tasks facing participants is to reach agreement about what kinds of environmental conditions should be placed on license. Researchers at the United States Geological Survey developed a model to analyze the institutional context of natural resource disputes. The Legal-Institutional Analysis Model (LIAM) is a computerized model that allows an analyst to determine the likely behavior of each organization in a conflict. The model also analyzes the types and levels of negotiating power held by each organization. Researchers at the USGS have used the model in several cases involving hydropower license applications. To use the model, they facilitate workshops for stakeholder groups in order to develop a shared understanding of the likely obstacles and opportunities for successful resolution of the issues. This allows a systematic workshop analyses to develop strategies for successful negotiations, because they are able to better understand the negotiation problem and work more effectively with both their allies and their competitors.

  13. 78 FR 16876 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-19

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... proposes to replace the VHS with an onsite diesel generator as the AAC power source providing this... power source (the VHS) with an additional onsite AAC power source (diesel generator). This equipment can...

  14. 78 FR 14126 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2013-03-04

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... of the document. The E-Filing system also distributes an email notice that provides access to the... Completion Time has no impact on the consequences of any design basis accident since the consequences of an...

  15. Licensed operating reactors status summary report, data as of December 31, 1985. Volume 10, No. 1

    International Nuclear Information System (INIS)

    1986-01-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  16. Analyses for licensing of new fuel types at Paks NPP

    International Nuclear Information System (INIS)

    Kereszturi, A.; Bogatyr, S.; Miko, S.; Nemes, I.

    2003-01-01

    In the last years Paks NPP initiated several projects aiming at the introduction of new fuel types and resulting in more economic fuel cycles. The motivations, the reasons, and the economic consequences of the above modifications are detailed. The application of a new fuel type requires the renewal of the relevant chapters of the Safety Analysis Report. The fulfilment of fuel design basis requirements, to be summarised briefly also in the paper, must be investigated during normal and accidental conditions. The characteristics of the different codes, the data transfer between them are detailed. After, the cases of the Normal Operation, Anticipated Operation Occurrence, and the Postulated Accidents, judged as the most relevant ones in case of fuel modifications, are overviewed. In the last part, selected examples of the licensing calculations, performed by the above tools are presented. In conclusion, modifications of the WWER fuel, namely increased enrichment, application of burnable fuel pins, modified geometry make more economic fuel cycles (larger discharge burnup, power up-rate, reduced pressure vessel fluence) are possible. The further step (increased enrichment, burnable poison) of the fuel modernisation at NPP Paks is necessary for more economic fuel cycles and fuel consuming. A sound basis of licensing methodology, safety analysis, and necessary computer codes for the WWER fuel modernisation is available

  17. Role of simulators in licensing and operator qualification in Germany

    International Nuclear Information System (INIS)

    Gronau, D.; Kuhn, A.

    1994-01-01

    According to the Guidelines issued by the licensing authorities, in the Federal Republic of Germany (FRG) comprehensive simulator training is demanded to obtain and preserve technical qualification. Due to the fact that knowledge is imparted most effectively by means of simulators, German utilities even go beyond the minimum times the authorities require for simulator training. To this purpose, the utilities have a special simulator training center available which is equipped with different full-scope simulators so that - depending on plant type and generation - the most appropriate simulator can be used. Plant-specific full-scope simulators are not absolutely necessary when the main emphasis is put on comprehension training. The reason therefor is the high automation degree in real plants, which requires manual interventions not earlier than half an hour after an accident has occurred. As, consequently, no immediate actions have to be practised, essentially more time in simulator training remains to cover unforeseen event sequences which require a high degree of physical and thermal hydraulic understanding. In case of great differences between real plant and full-scope simulator available a plant-specific part-task simulator, which takes all safety-relevant systems into account, may be used successfully, as shown by the experience gained with the Nuclear Functional Trainer (FTN). Furthermore, part-task simulators may relieve full-scope simulators in time so that sufficient capacity for extended simulator training is available. (orig.) (11 figs.)

  18. Decommissioning Licensing Process of Nuclear Installations in Spain

    International Nuclear Information System (INIS)

    Correa Sainz, Cristina

    2016-01-01

    The Enresa experience related to the decommissioning of nuclear facilities includes the decommissioning of the Vandellos I and Jose Cabrera NPPs. The Vandellos I gas-graphite reactor was decommissioned in about five years (from 1998 to 2003) to what is known as level 2. In February 2010, the decommissioning of Jose Cabrera power plant has been initiated and it is scheduled to be finished by 2018. The decommissioning of a nuclear power plant is a complex administrative process, the procedure for changing from operation to decommissioning is established in the Spanish law. This paper summarizes the legal framework defining the strategies, the main activities and the basic roles of the various agents involved in the decommissioning of nuclear facilities in Spain. It also describes briefly the Licensing documents required to obtain the decommissioning authorization and the Enresa point of view, as licensee, on the licensing decommissioning process. (author)

  19. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  20. The end game must end before license renewal begins

    International Nuclear Information System (INIS)

    Allen, S.R.; Edwards, D.W.

    1995-01-01

    The quest for a process and strategy to achieve license renewal was begun in the mid-1980s with the view that renewal was an imperative. A major portion of the nation's future electric supply seemed to be at stake. For plants who were becoming noncompetitive because of annual capital recovery, license renewal also appeared as the means of survival. These two perceptions led to a third: License renewal should be sought immediately upon completion of the first 20 yr of operation. Although the basic engineering premise of license renewal remains sound, the perceptions regarding timing of an application may be incorrect. This paper suggests that a gauntlet of uncertainty exists for all plants. Further, it is most severe between the 20th and 30th years of operation. Thus, the competitive viability of the plant must be sustained for most of the initial term before license renewal can become a serious option

  1. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  2. License - Gclust Server | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Gclust Server License License to Use This Database Last updated : 2009/09/14 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  3. THE SOCIAL OPERATING LICENSE OF CORPORATIONS: MINING COMPANIES AND THEIR CONSTITUENTS

    OpenAIRE

    Dumitru Borțun; Camelia Crişan

    2012-01-01

    Several authors from the CSR literature have proposed the term “license to operate” when referring to companies and their activities in the relevant communities (Visser, 2008, Post, Preston & Sachs, 2002). Others have implied this term when referring to the types of responsibilities a company needs to have in order to be able to exercise its activity in the society (Blair [1994] 2004, Clarke [1998] 2004 and Philips 2003). Consultancy companies have already coined the term: social license to o...

  4. Cost and risk reduction using upfront licensing in Canada. Annex 15

    International Nuclear Information System (INIS)

    Snell, V.G.

    2002-01-01

    The paper summarizes the use of 'up-front' licensing in Canada - how licensing requirements are defined, and met - in advance of a project commitment. The approach to licensing in Canada has allowed flexibility in development of new designs. Since licensing was originally risk-based, and current regulatory policy allows cost-benefit considerations as part of the decision making, risk can be and should be used in novel circumstances as a licensing tool. Since the licensing framework is non-prescriptive, innovative approaches to design can be introduced and dispositioned without changing the legal structure. This flexibility has been used in several up-front licensing reviews: a small urban heating reactor, repeat CANDU 6 generating station units, and the single unit CANDU 9 generating station. In the future we expect to apply it to advanced designs, as an essential part of risk reduction and customer confidence in the product. The important lessons learned in Canada include: Up-front licensing is essential to reduce the risk of licensing-related delays once a project has been committed. It requires a significant investment in time and effort from both the designer and the regulator; The most effective scope for up-front licensing is for the regulator to thoroughly assess novel concepts, test the design against changed domestic requirements, and follow-up on known difficult areas; and for the designer to ensure foreign requirements are incorporated. There is little benefit in certifying the design in detail; Although it would be satisfying to have legally-binding certification, in the end there can be no legal obligation on the regulator, and agreement is pursued on the basis of good faith that the regulator will not make arbitrary decisions and that the designer will meet agreed targets or requirements; In almost all circumstances, issues will arise that are beyond the current 'rules', however expressed. Rather than rushing to create new rules, one reaches a

  5. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  6. 77 FR 24712 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-25

    ... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...

  7. 75 FR 69080 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-10

    ... license as a Non-Vessel-Operating Common Carrier (NVO), and/or Ocean Freight Forwarder (OFF)--Ocean..., Building 14-A, Kenner, LA 70062, Officers: Gary J. Cheramie, President (Qualifying Individual), George...: License Transfer. Total Global Solutions, Inc. (NVO & OFF), 4290 Bells Ferry Road 224, Suite 106, Kennesaw...

  8. 10 CFR 490.306 - Vehicle operation requirements.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Vehicle operation requirements. 490.306 Section 490.306... Provider Vehicle Acquisition Mandate § 490.306 Vehicle operation requirements. The alternative fueled vehicles acquired pursuant to section 490.302 of this part shall be operated solely on alternative fuels...

  9. Overview of the role of economics in plant life management license renewal in the U.S

    International Nuclear Information System (INIS)

    Young, G.G.; Nelson, A.P.

    2002-01-01

    Full text: In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provides the requirements for an operating nuclear plant to seek license renewal. U.S. nuclear power plants obtain a 40-year initial operating license, but under 10 CFR Part 54, additional terms of 20-years each may be obtained through license renewal. Prior to 1995, the estimated cost just to prepare a license renewal application was about $40 million. Under the revised rule, the cost to prepare an application was reduced to about $10 million or less. Although the revised rule generated considerable interest, the decision to seek license renewal is fundamentally an economic decision. In 1995, many people believed that only a select few operating nuclear plants would pursue license renewal and that most would operate for no more than 40 years. The primary reason for this belief was that the cost of keeping U.S. nuclear plants running did not appear to be competitive with other forms of electricity generation. By 1998, the economic conditions in the U.S. were changing dramatically. Electricity deregulation was moving ahead, the need for electricity was growing, and the operating costs for nuclear power plants were declining. Also, in 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. The U.S. nuclear industry was somewhat skeptical that the NRC could complete the license renewal process in a timely and predictable manner. This skepticism was due to the protracted and unpredictable process used by the NRC to approve the original operating licenses, especially in the 1980's and early 1990's. In March 2000, the NRC approved the renewal of the 40-year operating licenses for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the

  10. Roundtable discussion: Materials management issues supporting licensing renewal

    International Nuclear Information System (INIS)

    1991-01-01

    The purpose of this technical session is to discussion the relationships between nuclear materials management/procurement engineering and plant license renewal. The basis for the discussion is DG-1009 'Standard format and content of technical information for applications to renew nuclear power plant operating licenses', dated 12/90

  11. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, J D

    1976-04-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria.

  12. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1976-01-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria. (Auth.)

  13. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  14. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  15. Review of the first partial licence for the Muelheim-Kaerlich reactor on the basis of the licensing requirements under nuclear law

    International Nuclear Information System (INIS)

    Hahn, L.; Wimmer, J.

    1990-11-01

    The expert opinion is restricted in the main to the licensing requirements in connection with the latest state-of-the-art precautionary measures against damage, i.e. subsection 3 of paragraph 7 section 2 Atomic Energy Act. Subject of the evaluations regarding the required new scope of licensing were the cancelled first partial licence, subsequent partial licences, the TUEV (Technical Control Board) expert opinion, the safety report with its continuations as well as the judgments of the Higher Administrative Court in Koblenz and the Federal Administrative Court. For determining the state-of-the-art, the expert opinion refers to the valid body of regulations, the latest concepts for PWRs in particular in the Federal Republic of Germany, and more recent results in reactor safety research. (orig./DG) [de

  16. Decay power evaluation for licensing analysis

    International Nuclear Information System (INIS)

    Tran, H.; Schrock, V.E.

    1987-01-01

    The ANSI/ANS 5.1-1979 Standard on Decay Power in shutdown reactors has been available as the basis for accident analysis for the past 7 yr. The US Nuclear Regulatory Commission has made a commitment to use this standard in new licensing approaches and has approved a licensing model for boiling water. More sweeping changes in the licensing rules are currently under review that will involve the use of best-estimate models and a statistical evaluation of the uncertainty (95% confidence level) in the key results. The structure of the decay power standard is well suited for such applications because it provides a statistically meaningful uncertainty in the decay power from fission products. The normalized decay power is a function specific to each point in the reactor volume due to the fact that the fuel composition develops a spatial dependence as burnup proceeds and decay power depends on the mix of fissioning nuclides. For reactor safety calculations it is desirable to employ a single temporal decay power function for the whole core inasmuch as many variations of accident parameters are required. This is the usual approach in large system thermal-hydraulics codes. Such a single representative or generic curve for a specified total operating power history can be acceptable but at the expense of some increase in the uncertainty. In this paper, the author present a method of evaluating the additional uncertainty in the decay power associated with use of a generic curve

  17. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC [Nuclear Regulatory Commission] licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor

  18. Four Essays on Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    &D strategies. On the supply side, the existing literature has been focused on understanding how technology licensing can be used by firms as a mechanism to recover investments in innovative activities and to foster learning opportunities. On the demand side, it has been shown that licensing is an important...... source that firms can tap into to feed their internal needs for innovative knowledge. While several studies have examined technology licensing through the lens of the licensor, research on how firms rely on licensing contracts to acquire knowledge and improve their innovation performance still leaves......Licensing contracts represent one of the most widely used mechanisms to exchange technologies and transfer know-how between firms. Due to the opportunities that licensing creates for firms operating on both sides of the markets for technology, it has increasingly become an integral part of firms’ R...

  19. Site Specific Vendor's License

    Data.gov (United States)

    Montgomery County of Maryland — This dataset contains information of a site-specific vendor's license which is required if an individual sells or offers to sell goods or services from a stationary...

  20. License - AcEST | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us AcEST License to Use This Database Last updated : 2010/02/15 You may use this database in co...he Standard License specifies the license terms regarding the use of this database and the requirements you ...must follow in using this database. The Additional License specifies those items ... License The Standard License for this database is the license specified in the Creative Commons Attribution...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  1. Groundfish/Crab License Limitation Program (LLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — As of January 1, 2000 a Federal License Limitation Program (LLP) license is required for vessels participating in directed fishing for LLP groundfish species in the...

  2. Considerations about the licensing process of special nuclear industrial facilities

    Energy Technology Data Exchange (ETDEWEB)

    Talarico, M.A., E-mail: talaricomarco@hotmail.com [Marinha do Brasil, Rio de Janeiro, RJ (Brazil). Coordenacao do Porgrama de Submarino com Propulsao Nuclear; Melo, P.F. Frutuoso e [Coordenacao dos Programas de Pos-Graduacao em Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear

    2015-07-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  3. Considerations about the licensing process of special nuclear industrial facilities

    International Nuclear Information System (INIS)

    Talarico, M.A.; Melo, P.F. Frutuoso e

    2015-01-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  4. 77 FR 22808 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-04-17

    ... and the basic operation of installed equipment is unchanged. Therefore, the proposed amendment does... Electric Station, Unit 3 (Waterford 3), Technical Requirements Manual: (a) TS 3.4.6, ``Chemistry,'' (b) TS... Technical Specifications (TS) 3.4.6 (Chemistry), TS 3.7.5 (Flood Protection), TS 3.7.9 (Sealed Source...

  5. Westinghouse AP1000 licensing maturity

    International Nuclear Information System (INIS)

    Schulz, T.; Vijuk, R.P.

    2005-01-01

    The Westinghouse AP1000 Program is aimed at making available a nuclear power plant that is economical in the U.S deregulated electrical power industry in the near-term. The AP1000 is two-loop 1000 MWe pressurizer water reactor (PWR). It is an up rated version of the AP600. The AP1000 uses passive safety systems to provide significant and measurable improvements in plant simplification, safety, reliability, investment protection and plant costs. The AP1000 uses proven technology, which builds on over 35 years of operating PWR experience. The AP1000 received Final Design Approval by the United States Nuclear Regulatory Commission (U.S. NRC) in September 2004. The AP1000 meets the US utility requirements. The AP1000 and its sister plant the AP600 have gone through a very through and complete licensing review. This paper describes the U.S. NRC review efforts of both the AP600 and the AP1000. The detail of the review and the independent calculations, evaluations and testing is discussed. The AP600 licensing documentation was submitted in 1992. The U.S. NRC granted Final Design Approval in 1999. During the intervening 7 years, the U.S. NRC asked thousands of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. For the AP1000 Westinghouse first engaged the U.S. NRC in pre-certification discussions to define the extent of the review required, since the design is so similar to the AP600. The AP1000 licensing documentation was submitted in March 2002. The U.S. NRC granted Final Design Approval in September 2004. During the intervening 2 1/2 years, the U.S. NRC asked hundreds of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. The implications of this review and approval on AP1000 applications in

  6. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  7. Data bank usage in reload design and licensing

    International Nuclear Information System (INIS)

    Goudey, J.L.; Hansen, E.C.; Scigliano, S.M.; Williams, R.D.

    1986-01-01

    In 1977 the Nuclear Energy Business Operations of General Electric Company (GE) began a major project to automate sequential execution of the data transfer between the various computer programs used in performing calculations to support design, release, licensing, and core management of fuel used in boiling water reactors (BWRs). A centralized and controlled data bank was designed and implemented to complement the data management system and to achieve the following objectives: (1) enhance the quality and reliability of engineering data used for design and licensing of BWR fuel; (2) provide for traceability and long-term retrievability of engineering data as required by 10CFR50, Appendix B; (3) standardize the location and minimize the redundancy of engineering data; and (4) make engineering data readily available to all individuals and computer programs with a need for it. The structure of this data bank, which has become known as the BWR Engineering Data Bank or BWR/EDB, was purposefully left flexible and expandable with the ability to accommodate numerical, logical, and textual data. The BWR/EDB has been used by GE during fuel release, fuel and core design, reload licensing, and core management activities for 30 to 40 commercial power reactors over the past several years

  8. 48 CFR 1852.225-70 - Export Licenses.

    Science.gov (United States)

    2010-10-01

    ... writing, that the Contracting Officer authorizes it to export ITAR-controlled technical data (including... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Contractor shall be responsible for obtaining export licenses, if...

  9. Needs of anticipation for transport operations

    International Nuclear Information System (INIS)

    Galtier, J.

    2005-01-01

    COGEMA LOGISTICS (formerly Transnucleaire) has designed and manufactured several thousands of casks, and owns fleet of more than 4000 casks. Benefiting from more than 40 years of experience in cask shipment COGEMA LOGISTICS has demonstrated an outstanding performance in transportation and has integrated all feed back from past successful operations in current ones. Early anticipation of needs, i.e. at preliminary design step, is of major importance from a technical point of view (capacity, interface, handling means, licensing), and also in terms of political and public acceptance issues from the design step. This paper will highlight for each step required for the implementation of an optimal transport and storage system: Decision to proceed (including political aspects)-Design of casks to be used (including operational interface)-Licensing process-Manufacturing process-Transport plan, Public Acceptance-Loading Operations-Transport-Maintenance operations. (authors)

  10. 7 CFR 735.101 - Financial records and reporting requirements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Financial records and reporting requirements. 735.101... Warehouse Licensing § 735.101 Financial records and reporting requirements. (a) Warehouse operators must maintain complete, accurate, and current financial records that must be available to DACO for review or...

  11. 48 CFR 227.7009 - Patent releases, license agreements, and assignments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Patent releases, license... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Infringement Claims, Licenses, and Assignments 227.7009 Patent releases, license agreements, and...

  12. Safety-evaluation report related to the renewal of the operating license for the Cornell University TRIGA Research Reactor. Docket No. 50-157

    International Nuclear Information System (INIS)

    1983-08-01

    This Safety Evaluation Report for the application filed by the Cornell University for a renewal of Operating License R-80 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by Cornell University and is located on the Cornell campus in Ithaca, New York. The staff concludes that the TRIGA reactor facility can continue to be operated by Cornell without endangering the health and safety of the public

  13. License - Open TG-GATEs | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Open TG-GATEs License License to Use This Database Last updated : 2012/05/24 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  14. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  15. Requirements to be met by the operation manual

    International Nuclear Information System (INIS)

    1981-03-01

    The rule applies to the contents and the lay-out of the operating manual for stationary nuclear power plants. The draft contains: 1. General requirement to be met by the contents of the operating manual. The operating manual to be arranged in 4 parts (part 1: internal rules and regulations; part 2: operation overall plant; part 3: incidents; part 4: operation systems). Safety specifications to be included in the manual, the exemption being the system of technical documentation. 2. General requirements to be met by the lay-out of the operating manual. Comprehensibility; legibility; structure and subdivisions; arrangement of the instructions and design of the manuals cover. 3. Requirements to be met by part 1. Defining the various internal rules and regulations (personnel management); rules and regulations concerning inspections and shift work; maintenance and repair; radiation protection; guard duty and admission; alarm; fire protection; first aid. 4. Requirements to be met by part 2. Provisions and operational limitations; limit values important from the point of view of safety; normal operation; anomalous operation; in-service inspections. 6. Requirements to be met by part 3. 7. Annex: Rules, regulations and stipulations mentioned in the rule draft. (orig.)

  16. Safety Evaluation Report related to the renewal of the operating license for the Westinghouse research reactor at Zion, Illinois (Docket No. 50-87)

    International Nuclear Information System (INIS)

    1984-09-01

    This Safety Evaluation Report, for the application filed by the Westinghouse Electric Company, for renewal of operating license number R-119 to continue to operate the research reactor, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is operated by Westinghouse and is located in Zion, Illinois. The staff concludes that the reactor facility can continue to be operated by Westinghouse without endangering the health and safety of the public

  17. SKB's safety case for a final repository license application

    International Nuclear Information System (INIS)

    Hedin, Allan; Andersson, Johan

    2014-01-01

    The safety assessment SR-Site is a main component in SKB's license application, submitted in March 2011, to construct and operate a final repository for spent nuclear fuel at Forsmark in the municipality of Oesthammar, Sweden. Its role in the application is to demonstrate long-term safety for a repository at Forsmark. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. The principal regulatory acceptance criterion, issued by the Swedish Radiation Safety Authority (SSM), requires that the annual risk of harmful effects after closure not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. SSM's regulations also imply that the assessment time for a repository of this type is one million years after closure. The licence applied for is one in a stepwise series of permits, each requiring a safety report. The next step concerns a permit to start excavation of the repository and requires a preliminary safety assessment report (PSAR) covering both operational and post-closure safety. Later steps include permission to commence trial operation, to commence regular operation and to close the final repository. (authors)

  18. Main features of licensing requirements for nuclear installations in several OECD member countries

    International Nuclear Information System (INIS)

    Reyners, P.

    1977-01-01

    The present paper contains a brief description of the main features of the above-mentioned six countries' licensing systems, namely the legal regime applicable, the appropriate licensing bodies, the general frame and scope of the respective national regimes, the involvement of the public and technical safety bodies as well as the inspection procedures. This description is supplemented by some introductory remarks. (orig.) [de

  19. Main features of licensing requirements for nuclear installations in several OECD member countries

    International Nuclear Information System (INIS)

    Reyners, P.

    1975-01-01

    The present paper contains a brief description of the main features of the above-mentioned six countries' licensing systems, namely the legal regime applicable, the appropriate licensing bodies, the general frame and scope of the respective national regimes, the involvement of the public and technical safety bodies as well as the inspection procedures. This description is supplemented by some introductory remarks. (orig.) [de

  20. Licensing and regulatory control of nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Obenhaus, W.

    1977-01-01

    The lecture is divided into three parts: 1) the legal conception and requirements of the German Atomic Energy Law (with special view on construction and operation of nuclear power plants), 2) the role of the Federation ('Bund') and the 'Laender' in the field of atomic energy and the Radiation Protection Ordinance (especially for licensing and supervision of nuclear power plants), 3) the function, participants, types and sequence of the strongly formalised licensing procedure for nuclear power plants, technical assessment in the frame of this procedure, content of a licence, possibility for altering the licence at a later date, role of administrative courts, continual supervision. (orig./HP) [de

  1. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  2. Comparative Analysis of Hydraulic Fracturing Wastewater Practices in Unconventional Shale Development: Newspaper Coverage of Stakeholder Concerns and Social License to Operate

    Directory of Open Access Journals (Sweden)

    Joel Gehman

    2016-09-01

    Full Text Available In this article we review prior literature regarding the concept of social license to operate, and related concepts, including corporate social responsibility, sustainable development, stakeholder management and cumulative effects. Informed by these concepts, we search for newspaper articles published in North American provinces and states where the Barnett, Duvernay, Marcellus and Montney shale plays are located. Using these data, we tabulate coverage of stakeholder concerns related to hydraulic fracturing and wastewater practices, and compare the extent to which these concerns vary over place and time. Our vocabulary analyses identify differences in the types and quantities of newspaper coverage devoted to concerns regarding hydraulic fracturing activities in general and wastewater practices in particular. We interpret these differences as suggesting that obtaining a social license to operate is likely not a one size fits all proposition. By understanding which stakeholder concerns are most salient in particular places and times, oil and gas operators and regulators can better tailor their strategies and policies to address local concerns. In other words, the findings from this study indicate that conventional understandings of risk as a technical or economic problem may not be adequate for dealing with unconventional resource challenges such as hydraulic fracturing. Operators and regulators may also need to manage social and cultural risks.

  3. 77 FR 60146 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-02

    ... previously available; and (iii) the filing has been submitted in a timely fashion based on the availability... closed; their position would be verified once per operating cycle. Basis for proposed no significant... new SR 3.4.11.4. Note 3 to SR 3.4.11.1 eliminated the requirement to cycle the Unit 2 Pressurizer...

  4. License - TMFunction | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMFunction License License to Use This Database Last updated : 2017/01/23 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ion-Share Alike 4.0 International is found here . With regard to this database, you are licensed to: freely

  5. A meta-analytic review of moral licensing.

    Science.gov (United States)

    Blanken, Irene; van de Ven, Niels; Zeelenberg, Marcel

    2015-04-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397 participants) that compare a licensing condition with a control condition. Based on this analysis, the magnitude of the moral licensing effect is estimated to be a Cohen's d of 0.31. We tested potential moderators and found that published studies tend to have larger moral licensing effects than unpublished studies. We found no empirical evidence for other moderators that were theorized to be of importance. The effect size estimate implies that studies require many more participants to draw solid conclusions about moral licensing and its possible moderators. © 2015 by the Society for Personality and Social Psychology, Inc.

  6. 47 CFR 25.117 - Modification of station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Modification of station license. 25.117 Section 25.117 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.117...

  7. 45 CFR 1321.75 - Licenses and safety.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Licenses and safety. 1321.75 Section 1321.75... AND COMMUNITY PROGRAMS ON AGING Service Requirements § 1321.75 Licenses and safety. The State shall... that the facility complies with all applicable State and local health, fire, safety, building, zoning...

  8. An augmented audit program for assuring radiation safety during radiographic examination operations

    International Nuclear Information System (INIS)

    Jervey, R.A. Jr.; Papin, P.J.

    1993-01-01

    Auditing a gamma radiography program is required as part of the authorizing license. Checklists and cursory reviews are the typical approach to addressing program requirements. A more proactive approach is recommended. The audit program described was prepared for a specific set of operating conditions but can be applied to any given program. Improvements in the effectiveness of the radiography safety program can be made with additional examination and emphasis on direct observation of licensed activities

  9. 78 FR 66713 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-06

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Action One Logistics, Inc..., Operating Manager (QI), Joseph Lam, Member, Application Type: New NVO License. Altex US, LLC (NVO & OFF), 1... President, Application Type: New NVO & OFF License. Andes Logistics USA LLC (NVO & OFF) 7500 NW 25 Street, 7...

  10. Looking at the licensability of System 80+ in the UK

    International Nuclear Information System (INIS)

    Molnar, C.M.

    1993-01-01

    There are today no internationally-sanctioned nuclear power plant design or licensing guidelines, or acceptance criteria, available for a standard plant design that would have multi-national regulatory acceptability. On the contrary, a diversity of national regulations govern the design and licensing of nuclear power stations around the world. When licensing a nuclear facility in this environment, it is important for all parties (utility, designer and regulator) to recognise consciously that there are numerous solutions available to satisfy varying safety requirements. There is no one right-way - there are only trade-offs justified on safety, performance benefit and cost, which, taken together, fashion designs that conform to national licensing requirements. (Author)

  11. Safety evaluation report related to the renewal of the operating license for the Washington State University TRIGA reactor. Docket No. 50-27

    International Nuclear Information System (INIS)

    1982-05-01

    This Safety Evaluation Report for the application filed by the Washington State University (WSU) for a renewal of operating license number R-76 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Washington State University and is located on the WSU campus in Pullman, Whitman County, Washington. The staff concludes that the TRIGA reactor facility can continue to be operated by WSU without endangering the health and safety of the public

  12. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  13. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  14. Licensing of the TRIGA Mark III reactor at the Mexican Nuclear Centre

    International Nuclear Information System (INIS)

    Ramirez, R.M.; Arrendondo, R.R.

    1990-01-01

    The TRIGA Mark III reactor at the Mexican Nuclear Centre went critical in 1968 and remained so until 1979 when the National Commission for Nuclear Safety and Safeguards (CNSNS), the Mexican regulatory authority, was set up. The reactor was therefore operating without a formal operating license, and the CNSNS accordingly requested the ININ to license the reactor under the existing conditions and to ensure that any modification of the original design complied with Standards ANSI/ANS-15 and with the code of practice set out in IAEA Safety Series No. 35. The most relevant points in granting the operating licence were: (a) the preparation of the Safety Report; (b) the formulation and application of the Quality Assurance Programme; (c) the reconditioning of the following reactor systems: the cooling systems; the ventilation and exhaust system; the monitoring system and control panel; (d) the training of the reactor operating staff at junior and senior levels; and (e) the formulation of procedures and instructions. Once the provisional operating license was obtained for the reactor it was considered necessary to modify the reactor core, which has been composed of 20% enriched standards fuel, to a mixed core based on a mixture of standard fuel and FLIP-type fuel with 70% 235 U enrichment. The CNSNS therefore requested that the mixed core be licensed and a technical report was accordingly annexed to the Safety Report, its contents including the following subjects: (a) neutron analysis of the proposed configuration; (b) reactor shutdown margins; (c) accident analysis; and (d) technical specifications. The licensing process was completed this year and we are now hoping to obtain the final operating license

  15. Licensing issues associated with the use of computers in the nuclear industry

    International Nuclear Information System (INIS)

    Ehrenberger, W.D.; Bloomfield, R.E.

    1987-01-01

    Computers are increasingly important to ensuring the safety of nuclear power stations. They have been proposed or introduced into operator information systems, operational control systems, as well as into systems for core protection and plant protection. Although the developments in the individual countries are not at the same pace, they do tend to render similar results. Particular licensing problems arise because of the increasing complexity of computer systems and the software involved. In the past licensing has been closely connected with the mental understanding of the systems to be licensed. This understanding is endangered with greater complexity of the systems. Although several ''manual'' methods of licensing exist, the problem of cost effective licensing is still more or less unsolved. For the future it is expected that tools will reduce the licensing efforts leaving the licenser and assessor free to concentrate on the most important issues. Such tools will probably make use of artificial intelligence techniques. They will enable the inclusion of more complex functions into safety systems and thereby increase the number of safety criteria and the number of echelons od defense. Another important use of artificial intelligence techniques will be the area of operator information systems and maintenance, including computer hardware maintenance. They will provide early detection of problems in the plant and thereby largely enhance plant availability and safety. Further studies are being proposed in the fields of software licensing tools, artificial intelligence, fail-safe and fault-tolerant software architectures, test procedures and system specification

  16. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    benefits and obviate issues related to technology transfer and knowledge recombination. At the same time, firms wish to select a partner operating in a different product market to minimize competitive downside issues and to access other product markets, skills and resources. We contend interdependence...... between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994...

  17. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  18. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  19. Updated requirements for control room annunciation: an operations perspective

    International Nuclear Information System (INIS)

    Davey, E.; Lane, L.

    2001-01-01

    The purpose of this paper is to describe the results of updating and aligning requirements for annunciation functionality and performance with current expectations for operational excellence. This redefinition of annunciation requirements was undertaken as one component of a project to characterize improvement priorities, establish the operational and economic basis for improvement, and identify preferred implementation options for Ontario Power Generation plants. The updated requirements express the kinds of information support annunciation should provide to Operations staff to support the detection, recognition and response to changes in plant conditions. The updated requirements were developed using several types of information: management and industry expectations for operations excellence, previous definitions of user needs for annunciation, and operational and ergonomic principles. Operations and engineering staff at several stations have helped refine and complete the initial requirements definition. Application of these updated requirements is expected to lead to more effective and task relevant annunciation system improvements that better serve plant operation needs. The paper outlines the project rationale, reviews development objectives, discusses the approaches applied for requirements definition and organization, describes key requirements findings in relation to current operations experience, and discusses the proposed application of these requirements for guiding future annunciation system improvements. (author)

  20. Future of nuclear licensing

    International Nuclear Information System (INIS)

    Denton, H.R.

    1984-01-01

    The following topics are outlined: Comparison of US and best foreign experience in nuclear power plant construction and operation; Status of licensing and construction; Observed attributes; Reduced construction time; Fewer reactor trips; Higher capacity factor; Diesel generator reliability; Steam generator tube leakage; and US regulatory initiatives: NRC efforts and industry efforts

  1. License - Dicty_cDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Dicty_cDB License to Use This Database Last updated : 2010/02/15 You may use this database i...w. The Standard License specifies the license terms regarding the use of this database and the requirements ...you must follow in using this database. The Additional License specifies those it...dard License The Standard License for this database is the license specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  2. Motorcycle Training for California Driver Licensing Personnel. Final Report.

    Science.gov (United States)

    California State Dept. of Motor Vehicles, Sacramento.

    The development of a 6-hour motorcycle course of instruction for personnel responsible for motorcycle licensing is described in this project report. The primary goals are stated and include (1) training driver licensing personnel in motorcycle safety and principles of operation, and (2) purchasing and installing appropriate motorcycle skill…

  3. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  4. License - Yeast Interacting Proteins Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Yeast Interacting Proteins Database License to Use This Database Last updated : 2010/02/15 You may use this database...nal License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additional ...the Standard License. Standard License The Standard License for this database is the license specified in th...e Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  5. 33 CFR 161.12 - Vessel operating requirements.

    Science.gov (United States)

    2010-07-01

    ....0′ N. extending eastward through the Golden Gate, and the navigable waters of San Francisco Bay and... safety beyond that provided by other means. The bridge-to-bridge navigational frequency, 156.650 MHz (Ch... Measures, and Operating Requirements § 161.12 Vessel operating requirements. (a) Subject to the exigencies...

  6. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  7. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  8. Environmental impact appraisal for renewal of Special Nuclear Material License No. SNM-1097 (Docket No. 70-1113)

    International Nuclear Information System (INIS)

    1984-06-01

    The proposed action, the full 5-year renewal of License SNM-1097, is necessary for GE to continue producing fuel used in light-water nuclear reactors. The fuel manufacturing operation principally involves converting UF 6 to UO 2 powder, pressing the UO 2 powder into pellets, sintering and grinding the pellets, loading the pellets into Zircaloy tubes, and then assembling the loaded tubes into fuel bundles. A variety of radiological and nonradiological gaseous, liquid, and solid wastes are generated. After treatment, some of the wastes are released to the environment. In addition to the nuclear fuel fabrication operation, there are other operations performed at GE which do not require NRC licensing (e.g., zirconium metal processing, production of fuel bundle and mechanical reactor components, and the manufacture of aircraft engine parts) and are not associated with the proposed action. 28 references, 15 figures, 21 tables

  9. Future of Nuclear Power: NRC emergency preparedness licensing activities agenda

    International Nuclear Information System (INIS)

    Essig, T.H.

    1995-01-01

    This talk summary addresses the issue of how future policies of the NRC will affect nuclear power in areas such as construction, emergency preparedness, and licensing. Specific topics covered include the following: Emergent EP licensing issues for operating nuclear Power Plants; 10CFR Part 52 and the process for licensing of Advanced Light Water Reactors (ALWRs); and potential revisions to emergency preparedness programs for future nuclear power plants

  10. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Manhattan College (Docket No. 50-199)

    International Nuclear Information System (INIS)

    1985-02-01

    This Safety Evaluation Report for the application filed by Manhattan College (MC) for a renewal of Operating License R-94 to continue to operate the MC 0.1-W open-pool training reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by MC and is located two blocks away from the MC main campus in the Riverdale area of New York City, New York. The staff concludes that the reactor facility can continue to be operated by MC without endangering the health and safety of the public

  11. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  12. Nuclear regulation. License renewal questions for nuclear plants need to be resolved

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Kruslicky, Mary Ann; McDowell, William D. Jr.; Coleman, Robert L.

    1989-04-01

    A December 1986 pipe rupture at Virginia Power's Surry unit 2 nuclear power plant injured eight workers; four later died. As a result of this accident, Representative Edward J. Markey requested GAO to examine the Surry accident and assess the problems confronting aging nuclear plants. In March 1988 we reported our findings concerning the accident and a July 1987 incident at the Trojan nuclear plant in Oregon. This report addresses problems confronting aging nuclear plants by examining the Nuclear Regulatory Commission's (NRC) program to develop a license renewal policy and accompanying regulations, and the initiatives underway by the Department of Energy (DOE) and the electric utility industry to extend the operating lives of these plants. Nuclear power has become second only to coal as the largest producer of electricity in the United States. The 110 nuclear plants currently in service are operated by 54 utilities, provide about 20 percent of the nation's electricity, and represent a capital investment of over $200 billion. The Atomic Energy Act authorizes NRC to issue nuclear plant operating licenses for up to 40 years and provides for license extensions beyond the initial operating period. The act does not, however, stipulate the criteria for evaluating a utility request to operate a nuclear plant longer than 40 years. The oldest operating license currently in effect will expire in the year 2000. According to NRC, about one-half of the existing operating licenses will terminate by the year 2015, and most licenses will expire by about 2030. Many utilities will have to decide in the early 1990s whether to continue operating older nuclear plants or to construct new generating capacity. A clear understanding of the terms and conditions governing the license renewal process will be a key element in deciding how to meet future electricity demand. Although NRC has developed 3 possible license renewal policy options and identified 15 areas of regulatory uncertainty that

  13. 21 CFR 111.127 - What quality control operations are required for packaging and labeling operations?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... and Process Control System: Requirements for Quality Control § 111.127 What quality control operations are required for packaging and labeling operations? Quality control operations for packaging and...

  14. Overview of plant life management for long term operation in nuclear power plants

    International Nuclear Information System (INIS)

    Kang, K.S.; Vincze, P.; Bychkov, A.

    2014-01-01

    Many IAEA member states have given high priority to licensing their nuclear power plants to operate for terms longer than the time frame originally anticipated (generally 40 years). The task of managing plant ageing is assigned in most member states to an engineering specialty called 'plant life management' (PLiM) applying a systematic analysis methodology to System Structure Components (SSCs) ageing. In many countries, the safety performance of nuclear power plants is periodically assessed and characterized via the periodic safety review (PSR) process. Regulatory review and acceptance of PSRs constitutes for these countries the licensing requirement for continued operation of the plant to the following PSR cycle (usually 10 years). In the USA and in other countries operating US designed plants, instead of PSR process, a license renewal application (LRA) process is followed, which requires certain prerequisites such as ageing management programs, particularly for passive irreplaceable SSCs. Active components are normally addressed via the maintenance rule (MR) requirements and other established regulatory processes. A third group of member states have adopted a combined approach that incorporates elements of both the PSR process and selected LRA specific requirements, such as time limited ageing analysis. The article ends with some IAEA recommendations for the implementation of national PLiM programs

  15. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  16. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  17. Safety Evaluation Report related to the full-term operating license for Dresden Nuclear Power Station, Unit 2 ( Docket No. 50-237)

    International Nuclear Information System (INIS)

    1990-10-01

    The Safety Evaluation Report for the full-term operating license application filed by Commonwealth Edison Company for the Dresden Nuclear Power Station, Unit 2, has been prepared by the Office of Nuclear Regulation of the US Nuclear Regulatory Commission. The facility is located in Grundy County, Illinois. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can continue to be operated without endangering the health and safety of the public. 72 refs

  18. Safety evaluation report related to the renewal of the operating license for the Zero-Power Reactor at Cornell University, Docket No. 50-97

    International Nuclear Information System (INIS)

    1983-09-01

    This Safety Evaluation Report for the application filed by Cornell University (CU) for a renewal of Operating License R-80 to continue to operate a zero-power reactor (ZPR) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by Cornell University and is located on the Cornell campus in Ithaca, New York. The staff concludes that the ZPR facility can continue to be operated by CU without endangering the health and safety of the public

  19. License - CREATE portal | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us CREATE portal License License to Use This Database Last updated : 2016/03/16 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  20. CSNI Status summary on utilization of best-estimate methodology in safety analysis and licensing

    International Nuclear Information System (INIS)

    1996-10-01

    The PWG 2 Task Group on Thermal Hydraulic System Behavior has discussed the subject of the use of best-estimate codes in the licensing process (codes that model thermal hydraulic processes are important to assessing safety system performance). The Task Group set out to determine the prevailing practices in member countries, concerning safety assessment and safety review of transients affecting the reactor coolant system. A summary of information provided by member countries in response to eleven questions is given: Who is Responsible for Safety Analysis? Who is Responsible for Review and Evaluation of Safety Analysis? Do the Regulations Permit the use of Best-Estimate Codes? What are the Requirements for What Constitutes a Best Estimate Code? What are the Requirements Concerning Code Documentation? What are the Requirements for Review of Code Models and Correlations? What are the Requirements Concerning Code Assessment? What are the Requirements Concerning Initial and Boundary Conditions? What are the Requirements Concerning Operability of Active Equipment? What are the Requirements Concerning Operator Actions?

  1. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  2. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Purdue University: Docket No. 50-182

    International Nuclear Information System (INIS)

    1988-04-01

    This Safety Evaluation Report for the application filed by Purdue University for a renewal of Operating License R-87 to continue to operate a research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned by Purdue University and is located on the campus in West Lafayette, Indiana. On the basis of its technical review, the staff concludes that the reactor facility can continue to be operated by the university without endangering the health and safety of the public or the enviroment

  3. To License or Not to License Revisited: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    OpenAIRE

    Thomas Lonardo; Doug White; Alan Rea

    2009-01-01

    In this update to the previous year's study, the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner lice...

  4. Operating experience and maintenance at the TRIGA Mark II LENA reactor

    International Nuclear Information System (INIS)

    Cingoli, F.; Altieri, S.; Lana, F.; Rosti, G.; Alloni, L.; Meloni, S.

    1988-01-01

    The last two years at the Trigs Mark II LENA plant were characterized by the running of the n-n-bar oscillation NADIR experiment. Consequently reactor operation was positively affected and the running hours rose again above 1000 hours per year. The LENA team was also deeply involved in the procedures for the renewal of the reactor operation license. The new requirements set by the Nuclear Energy Licensing Authority (ENEA for Italy) most of which concerning radiation protection and environmental impact, have been already fulfilled. In some cases the installation of new apparatus is underway

  5. AECB staff review of Pickering NGS operations for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The operation of Pickering NGS-A Units 1-4 and Pickering NGS-B Units 5-8 are monitored to ensure compliance with licensing requirements by the AECB Pickering project office staff. This report presents AECB staff's review of major licensing issues and of the operational performance of Pickering NGS during 1988. The report is limited to those aspects that AECB staff considers to have particular safety significance. More detailed information on routine performance is contained in Ontario Hydro's 1988 Quarterly Technical Reports for Pickering NGS-A and Pickering NGS-B

  6. Impact on future licensing

    International Nuclear Information System (INIS)

    Pasedag, W.F.; Postma, A.K.

    1986-01-01

    The TMI-2 accident has had a dramatic impact on the assessment of severe accidents, particularly on accident source term assumptions. TMI not only demonstrated that regulatory interest in severe accidents is appropriate, but also illustrated our limited understanding of fission product behaviour under degraded core conditions. The resulting reassessment of accident source terms has resulted in a concerted, world-wide research effort, which has produced a new source term estimation methodology. In order to assess the potential impact of the application of this methodology on regulatory requirements, a comparison with the approach used in licensing analyses is necessary. Such a comparison performed for the TMI-2 accident sequence, shows that differences in assumptions concerning accident progression far outweigh the differences in the methodology per se. In particular, the degree of conservatism incorporated into assumptions concerning operator action and containment response has over-riding influence on source term estimates. A major contribution to the impact of the new source term methodology on regulatory requirements, therefore, is its capability to provide the improved level of understanding necessary for reassessment of regulatory assumptions in this area

  7. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  8. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  9. ACR: Licensing and design readiness

    International Nuclear Information System (INIS)

    Alizadeh, A.

    2009-01-01

    Full text The Canadian nuclear technology has a long history dating back to the 1940s. In this regard, Canada is in a unique situation, shared only by a very few countries, where original nuclear power technology has been invented and further developed. Canadian Nuclear Safety Commission (CNSC), then called AECB, was established in 1946. CNSC focuses on nuclear security, nuclear safety, establishing health and safety regulations, and has also played an instrumental role in the formation of the IAEA. CNSC has provided assistance to the establishment of regulatory authorities in AECL's client countries such as Korea, Argentina, China and Romania. AECL has developed the Gen III+ ACR 1000 as evolutionary advancement of the current CANDU 6 reactor. ACR-1000 has evolved from AECL's in depth experience with CANDU systems, components, and materials, as well as the feedback received from owners and operators of CANDU plants. The ACR-1000 design retains the proven strengths and features of CANDU reactors, while incorporating innovations and state-of-the-art technology. It also features major improvements in economics, inherent safety characteristics, and performance. ACR-1000 has completed its Basic Engineering, has advanced in the licensing process in Canada, and is ready for deployment in Canadian and world markets. EC6 is an evolution of CANDU 6 and is a Gen III natural uranium fuelled reactor. Its medium size and potential for fuel localization and advanced fuel cycles is an optimal strategic solution in many markets.AECL's reactor products are shown to be compliant with a variety of licensing and regulatory requirements. These include the new CNSC DRD-337, IAEA NS-R1, and EUR. This allows the countries interested in CANDU reactor products to be confident of its licensing in their own regulatory regimes.

  10. Transporting existing VSC-24 canisters using a risk-based licensing approach

    Energy Technology Data Exchange (ETDEWEB)

    Srinivasan, R.; Sisley, S.E.; Hopf, J.E. [BNFL Fuel Solutions, Campbell, CA (United States)

    2004-07-01

    The eventual disposition of the spent fuel assemblies loaded in canisters and casks currently designed and licensed only for on-site storage is an industry-wide issue. The canister-specific BUC evaluation approach developed by BFS can be used to license many of these storage canisters and casks for transportation. This will allow these storage canisters and casks to be transported intact to a long-term storage facility or repository, thereby minimizing fuel handling operations, impact on plant operations, and occupational exposure, as well as total infrastructure costs. Application of the proposed canister-specific BUC analysis approach to a preliminary evaluation of the 58 loaded MSBs demonstrates the benefits of this approach. The results of this preliminary evaluation show that a more rigorous analysis based on the known characteristics of the loaded spent fuel, rather than the design-basis fuel parameters, produces significantly lower maximum keff values and can be used to qualify many of the existing loaded storage canisters for transportation. Transportation certification for storage canisters having more reactive spent fuel payloads may require reliance on BUC approaches that are more aggressive than current NRC guidelines allow. Credit may be required for fission- product isotopes that do not have sufficient chemical assay data for benchmarking. In addition, reduced criticality safety margins may be required. For these more-aggressive BUC approaches, a risk assessment should be provided to support the NRC-approval basis. The risk assessment should evaluate the possibility and consequences of an accidental criticality event based upon inaccuracies in the characterization of the spent-fuel payloads.

  11. Transporting existing VSC-24 canisters using a risk-based licensing approach

    International Nuclear Information System (INIS)

    Srinivasan, R.; Sisley, S.E.; Hopf, J.E.

    2004-01-01

    The eventual disposition of the spent fuel assemblies loaded in canisters and casks currently designed and licensed only for on-site storage is an industry-wide issue. The canister-specific BUC evaluation approach developed by BFS can be used to license many of these storage canisters and casks for transportation. This will allow these storage canisters and casks to be transported intact to a long-term storage facility or repository, thereby minimizing fuel handling operations, impact on plant operations, and occupational exposure, as well as total infrastructure costs. Application of the proposed canister-specific BUC analysis approach to a preliminary evaluation of the 58 loaded MSBs demonstrates the benefits of this approach. The results of this preliminary evaluation show that a more rigorous analysis based on the known characteristics of the loaded spent fuel, rather than the design-basis fuel parameters, produces significantly lower maximum keff values and can be used to qualify many of the existing loaded storage canisters for transportation. Transportation certification for storage canisters having more reactive spent fuel payloads may require reliance on BUC approaches that are more aggressive than current NRC guidelines allow. Credit may be required for fission- product isotopes that do not have sufficient chemical assay data for benchmarking. In addition, reduced criticality safety margins may be required. For these more-aggressive BUC approaches, a risk assessment should be provided to support the NRC-approval basis. The risk assessment should evaluate the possibility and consequences of an accidental criticality event based upon inaccuracies in the characterization of the spent-fuel payloads

  12. License - Metabolonote | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Metabolonote License License to Use This Database Last updated : 2016/06/22 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...e Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  13. LES view a market requiring an assured domestic alternative

    International Nuclear Information System (INIS)

    Arnold, W.H.

    1991-01-01

    Louisiana Energy Services (LES) was founded in June, 1989, on the premise that the US uranium enrichment services market requires an alternative domestic source of supply, which would be both highly reliable and economically competitive. LES is comprised of the operating company of a partnership among subsidiaries of three US utilities, an engineer-constructor, and an enricher (Urenco). The US partners hold in the aggregate a majority share. LES will begin delivering to US customers in 1996 using a process well proven in european practice. LES submitted a license application to the US Nuclear Regulatory Commission (USNRC) for the Claiborne Centrifuge Enrichment Center on schedule and within budget, and they have accepted it for review. LES expects to receive that license at the end of 1992, although the achievement of that schedule will require diligence of both LES and the NRC. LES was very pleased that the US Congress passed an amendment to the Atomic Energy Act specifically allowing them to apply for a combined license for construction and operation, thus removing what is currently one of the most serious obstacles to successful completion of nuclear power plant projects. It is clear that the progress of licensing will be watched by the nuclear industry as a sign of how new plant applications will fare in general

  14. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  15. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  16. Operating Plan and Guidelines (2011 - 2016)

    International Nuclear Information System (INIS)

    2011-01-01

    The Committee on Nuclear Regulatory Activities (CNRA) of the OECD Nuclear Energy Agency (NEA) is an international committee made up primarily of senior nuclear regulators. It was established in 1989 as a forum for the exchange of information and experience among regulatory organisations and for the review of developments which could affect regulatory requirements. The Committee is responsible for the programme of the NEA, concerning the regulation, licensing and inspection of nuclear installations. In particular, the Committee reviews current practices and operating experience. The Joint CSNI/CNRA Strategic Plan states that: The Operating Plan for each committee aligns with the Joint CNRA/ CSNI Strategic Plan. The Committee's Operating Plans describes each Committee's organisation, priorities, and operating procedures to be used in fulfilling their mandates in accordance with this strategic plan. Specific attention will be given to ensure that cross-cutting issues are satisfactorily dealt with. This report represents such an operating plan. The intention is that it should fit onto a new third rung on the ladder representing the hierarchy of documents that govern the work of CNRA. At the top of this hierarchy is the Strategic Plan of the NEA; immediately below that is the Joint CSNI/CNRA Strategic Plan; followed by the new operating plan and the guidelines for methods of work. This plan sets the basis for establishing the current CNRA Programme of Work. Since the issuance of the last plan in 2007 there has been a significant shift and many member countries are now constructing new facilities or in the process of legislative or technical processing for new licenses. This comes along in an atmosphere in which current operating plants requesting power up-rates, extended licenses, and substantial activity in new licensing and new construction. It is clear that all these activities require similar attention from the regulators and operators, and the responsibilities

  17. 75 FR 32983 - Commercial Driver's License (CDL) Standards: Exemption

    Science.gov (United States)

    2010-06-10

    ...-28480] Commercial Driver's License (CDL) Standards: Exemption AGENCY: Federal Motor Carrier Safety... commercial driver's license (CDL) as required by current regulations. FMCSA reviewed NAAA's application for... demonstrate alternatives its members would employ to ensure that their commercial motor vehicle (CMV) drivers...

  18. 47 CFR 25.113 - Station licenses and launch authority.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Station licenses and launch authority. 25.113 Section 25.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.113 Station...

  19. The licensing of shipping containers for radioactive materials

    International Nuclear Information System (INIS)

    Schulz-Forberg, B.

    1987-01-01

    In the Federal Republic of Germany the competent Federal Minister regulated the licensing procedure in a guideline while assigning the PTB the function of competent authority, and stipulating that BAM is to execute design inspection for approval. On completion of design inspection, BAM summarizes the results in a certificate which also states the measures required to be taken in quality monitoring in the manufacturing and maintenance of packagings. A sheet specifies the implemental provisions covering quality-assurance measures in planning, manufacturing, commissioning and operation of shipping items of types B(U) and B(M), and of nuclear safety classes I, II, and III. (orig./DG) [de

  20. Regulations and the licensing process in Austria

    International Nuclear Information System (INIS)

    Matulla, Herbert U.

    1979-01-01

    A review of the licensing process which took place from 1971 to 1978 shows which laws, regulations and standards were used in checking the safety aspects of the nuclear power plant and which organisations participated in the licensing process. The internal organisation of the Austrian main-expert in the procedure is illustrated. Examples of detail-work are explained. The importance of intensive co-operation of the different technical groups and the problems of comparable examination depth are underlined. (author)

  1. 10 CFR 40.34 - Special requirements for issuance of specific licenses.

    Science.gov (United States)

    2010-01-01

    ... license to manufacture industrial products and devices containing depleted uranium, or to initially....32; (2) The applicant submits sufficient information relating to the design, manufacture, prototype... industrial product or device to provide reasonable assurance that possession, use, or transfer of the...

  2. Licensing Status of New and Expanding In-Situ Recovery Uranium Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Catchpole, G.; Thomas, M., E-mail: gccatchpole@uranerz.com [Uranerz Energy Corporation (URZ), Casper, WY (United States)

    2014-05-15

    state agencies to construct and operate commercial uranium ISR mines on their respective properties in Wyoming. The only other states that have had, and currently have, commercial ISR uranium production are Nebraska and Texas. According to the EIA, in 2008 there was production from one ISR mine in Nebraska and from four ISR mines in Texas. Applications are pending for expansion of the Crow Butte mine in Nebraska, and applications are also pending for both a new ISR mine and expansion of at least one existing mine in Texas. Nebraska, like Wyoming, is a non-agreement state requiring both state and federal operating licenses for an ISR uranium mine while Texas is an agreement state requiring only a state license for operating an ISR mine. In addition to the aforementioned states, ISR development plans and licensing status of projects in Colorado, New Mexico and South Dakota will also be covered in this paper. (author)

  3. Licensing the California low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Dressen, A.L.; Serie, P.J.; Junkert, R.

    1992-01-01

    California has made significant progress toward the issuance of a license to construct and operate the Southwestern Compact's low-level radioactive waste disposal facility. However, obstacles to completing construction and preparing to receive waste still exist. This paper will describe the technical licensing issues, EIR/S process, political events, and public interactions that have impacted on California regulators' ability to complete the license application review and reach a decision on issuing a license. Issues associated with safely and liability evaluations, finalization of the environmental impact report, and land transfer processes involving multiple state, federal, and local agencies will be identified. Major issues upon which public and political opposition is focusing will also be described. (author)

  4. 12 CFR 932.6 - Operations risk capital requirement.

    Science.gov (United States)

    2010-01-01

    ... operations risk capital requirement shall at all times equal 30 percent of the sum of the Bank's credit risk... percent but no less than 10 percent of the sum of the Bank's credit risk capital requirement and market... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Operations risk capital requirement. 932.6...

  5. Nuclear licensing and supervision in Germany

    International Nuclear Information System (INIS)

    1996-06-01

    The legal instrument for implementing the licensing and supervisory procedure is specified by statutory ordinances, guidelines and provisions. The licensing requirements for nuclear power plants on the final storage of radioactive wastes in the federal republic of germany are described. The nuclear facilities are subject to continuous state supervision after they have been granted. The appendix gives a brief account of the most important ordinances relating to the AtG and extracts from the Nuclear Safety Convention. (HP)

  6. License - Society Catalog | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Society Catalog License License to Use This Database Last updated : 2012/01/17 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  7. Requirements by the operator of supporting systems

    International Nuclear Information System (INIS)

    Grimm, E.; Lot, L.

    1996-01-01

    Requirements by the nuclear power station operator on computer support orient themselves to the various operating situations which can arise in the plant. Event-oriented or system-oriented methods of handling determine the type of support by the computer. Pure plant information in situations with few events, an intelligent alarm system in situations with many events and a guide by means of pre-prepared procedures are an aspect of the operator requirements of computer solutions. These are the themes dealt with in this paper. A further theme is the support of the operator by the ergonomics of the control room in the areas of working place, lighting, air conditioning and acoustics. (author) 4 figs

  8. AV Licensing Brings Kids & Media Together

    Science.gov (United States)

    Watson, Elizabeth; Maloney, Brenda D.

    1975-01-01

    The Fitchburg, Massachusetts, Public Library holds training sessions for children on the use of audiovisual equipment, and licenses children who have learned how to operate the equipment so they may check it out and take it home. (LS)

  9. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  10. Licensing of simple digital devices

    International Nuclear Information System (INIS)

    Jackson, T. W.

    2008-01-01

    The inability to guarantee error-free software gave rise to the potential for common-cause failure of digital safety systems in nuclear power plants. To address this vulnerability, the U. S. Nuclear Regulatory Commission (NRC) required a quality software development process and a defense-in-depth and diversity analysis for digital safety systems. As a result of recent interim [NRC] staff guidance in the digital instrumentation and control (I and C) area, licensing of simple digital devices decreases some regulatory burden with respect to demonstrating a quality software development process and defense-in-depth and diversity analysis. This paper defines simple digital devices and addresses the interim staff guidance that applies to such devices. The paper also highlights the technical aspects that affect the licensing of such devices and incorporates licensing experience in the U.S. to date. (authors)

  11. Safety Evaluation Report related to the renewal of the operating license for the research reactor at Michigan State University (Docket No. 50-294)

    International Nuclear Information System (INIS)

    1984-08-01

    This Safety Evaluation Report for the application filed by the Michigan State University (MSU) for a renewal of operating license number R-114 to continue to operate the TRIGA Mark I research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the Michigan State University and is located on the campus of Michigan State University in East Lansing, Ingham County, Michigan. The staff concludes that the TRIGA reactor facility can continue to be operated by MSU without endangering the health and safety of the public

  12. 10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.

    Science.gov (United States)

    2010-01-01

    ... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license... 10 Energy 2 2010-01-01 2010-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF...

  13. Planning and Estimation of Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D

  14. Safety evaluation report related to the renewal of the operating license for the research reactor at the University of Florida. Docket No. 50-83

    International Nuclear Information System (INIS)

    1982-05-01

    This Safety Evaluation Report for the application filed by the University of Florida (UF) for a renewal of Operating License R-56 to continue to operate its Argonaut-type research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Florida and is located on the UF campus in Gainesville, Alachua County, Florida. The staff concludes that the reactor facility can continue to be operated by UF without endangering the health and safety of the public

  15. 76 FR 40937 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Science.gov (United States)

    2011-07-12

    ... define a new time limit for restoring inoperable reactor coolant system (RCS) leakage detection... [Pressurized-Water Reactor] PWR Operability Requirements and Actions for RCS Leakage Instrumentation''. Basis... proposed change clarifies the operability requirements for the RCS leakage detection instrumentation and...

  16. Lessons learned from the licensing process and the operational performance of the important to safety digital application implemented at the Mexican nuclear facilities

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.

    1998-01-01

    This paper describes the main concerns detected during the licensing processes performed by the Mexican Nuclear Regulatory Commission (CNSNS) for the NUMAC-PRNM, the Integrated Computer Systems at the Laguna Verde Nuclear Power Station (LVNPS) and for the Digital Control Console of the Triga Mark III Research Reactor (TMRR). The review and approval process was performed following the guidelines of the US Nuclear Regulatory Commission (USNRC); the regulatory frame applied includes the Code of Federal Regulation (10CFR50), some Regulatory Guides, such as: RG 1.152, RG 1.153, some Industrial Standards, for example: IEEE-279, IEEE-603, IEEE-7.4.3-2. Also, based on the operational experience taken from the LVNPS License Event Report (LER) reported under the 10CFR50.72 and 10CFR50.73 USNRC rules, and from the Report of Events to be Analyzed (REA) issued for a CNSNS agreement with the utility stated by the necessity to determine failure rates of digital equipment, some case studies and a preliminary failure cause classification is shown. The Event Report evaluation covered topics related to the software, hardware and firmware issues. Finally, the lessons learned from the licensing assessments and from the operational experience of the digital applications implemented are presented. It will also give the regulatory activities related to an IAEA international cooperation project on I and C digital upgrade concerns. (author)

  17. Practical issues in structuring seismic licensing and acquisition agreements

    International Nuclear Information System (INIS)

    Lawrence, M.A.

    1999-01-01

    Some issues facing the geophysical industry in the area of licensing and acquisition agreements are discussed, focusing on a very large business segment of the industry called 'non-exclusive' seismic data (commonly referred to as SPEC data). A historical perspective of the industry in the Gulf of Mexico is presented, highlighting some important aspects of data licenses. The benefits of licensing three-dimensional data to the exploration industry include: (1) economy of scale, (2) 3-D is more affordable, (3) reduced barriers to entry by independents, and (4) improved success rates and reduced risk. A list of 'SPEC' companies in the Gulf of Mexico is provided and the data licensing process is outlined. There are two basic types of seismic data use licenses. The first is for a single, one-time transaction, and the other (which is more prevalent), covers multiple use licenses contemplated over a period of time. This paper briefly outlined the meaning of some important terms usually found in a license agreement, among them ownership, rights of licensee, term, disclosure to third parties, and transfer. International 'SPEC' programs and the requirements for a successful 'SPEC' program are described. The requirements include: a stable host government, reliable, competitive system of concession offerings, long term scheduled offerings, clear, consistent, and acceptable concession terms to oil and gas companies, and consistent, fair and timely method of evaluating bids and awarding concessions. 001CA9901758

  18. 49 CFR 385.605 - New entrant registration driver's license and drug and alcohol testing requirements.

    Science.gov (United States)

    2010-10-01

    ... America-Domiciled Carriers § 385.605 New entrant registration driver's license and drug and alcohol... carrier must subject each of the drivers described in paragraph (a) of this section to drug and alcohol... 49 Transportation 5 2010-10-01 2010-10-01 false New entrant registration driver's license and drug...

  19. Effective Continuing Education for Licensed Real Estate Professionals

    Science.gov (United States)

    Tilton, Wendy A.

    2004-01-01

    Mandatory real estate education has been intensely debated for many years. New Jersey is the only state in the nation that does not require licensed real estate agents to attend an ongoing educational event after securing a license to practice. A bill was proposed to the legislature to mandate real estate education in June of 2001. (It was…

  20. Challenges in licensing a sodium-cooled advanced recycling reactor

    International Nuclear Information System (INIS)

    Levin, Alan E.

    2008-01-01

    As part of the Global Nuclear Energy Partnership (GNEP), the U.S. Department of Energy (DOE) has focused on the use of sodium-cooled fast reactors (SFRs) for the destruction of minor actinides derived from used reactor fuel. This approach engenders an array of challenges with respect to the licensing of the reactor: the U.S. Nuclear Regulatory Commission (NRC) has never completed the review of an application for an operating license for a sodium-cooled reactor. Moreover, the current U.S. regulatory structure has been developed to deal almost exclusively with light-water reactor (LWR) designs. Consequently, the NRC must either (1) develop a new regulatory process for SFRs, or (2) reinterpret the existing regulations to apply them, as appropriate, to SFR designs. During the 1980s and 1990s, the NRC conducted preliminary safety assessments of the Sodium Advanced Fast Reactor (SAFR) and the Power Reactor Innovative Small Module (PRISM) designs, and in that context, began to consider how to apply LWR-based regulations to SFR designs. This paper builds on that work to consider the challenges, from the reactor designer's point of view, associated with licensing an SFR today, considering (1) the evolution of SFR designs, (2) the particular requirements of reactor designs to meet GNEP objectives, and (3) the evolution of NRC regulations since the conclusion of the SAFR and PRISM reviews. (author)

  1. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2, Docket nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1989-08-01

    In August 1983 the staff of the Nuclear Regulatory commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for the licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984. Supplement 4 was issued in May 1985. Supplement 5 was issued in July 1985. Supplement 6 was issued in August 1985 and Supplement 7 was issued in April 1989. Supplement 7 addresses the major design differences between Units 1 and 2, the resolution of all issues that remained open when the Unit 1 full-power license was issued, the staff's assessment regarding the application by the licensee to operate Unit 2 and issues that require resolution before issuance of an operating license for Unit 2. Supplements 8 and 9 address further issues that require resolution prior to issuance of an operating license. 1 tab

  2. Safety evaluation report related to the renewal of the operating license for the University of New Mexico Research Reactor (Docket No. 50-252)

    International Nuclear Information System (INIS)

    1987-03-01

    This Safety Evaluation Report for the application filed by the University of New Mexico (UNM) for renewal of Operating License No. R-102 to continue to operate its research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located on the campus of the University of New Mexico in Albuquerque, New Mexico. The staff concludes that the reactor can continue to be operated by the University of New Mexico without endangering the health and safety of the public. 7 refs., 7 figs., 2 tabs

  3. Safety Evaluation Report related to the renewal of the operating license for the General Electric-Nuclear Test Reactor (GE-NTR) (Docket No. 50-73)

    International Nuclear Information System (INIS)

    1984-09-01

    This Safety Evaluation Report for the application filed by the General Electric Company (GE) for a renewal license number R-33 to continue to operate its research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by GE and is located in Pleasanton, California. The staff concludes that the reactor can continue to be operated by GE without endangering the health and safety of the public

  4. Licensing schedule for away-from-reactor (AFR) spent fuel storage facilities

    International Nuclear Information System (INIS)

    Gray, P.L.

    1981-08-01

    The Nuclear Regulatory Commission has authority to issue licenses for Away-From-Reactor (AFR) installations for the storage of spent nuclear fuel. This report presents a detailed estimate of the time required to prosecute a licensing action. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  5. License - PGDBj - Ortholog DB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PGDBj - Ortholog DB License License to Use This Database Last updated : 2017/03/07 You may use this database...cifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons A...ttribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  6. The pre-licensing of a multi-purpose hybrid research reactor for high-tech applications 'MYRRHA'

    International Nuclear Information System (INIS)

    Hakimi, N.; Dams, C.; Wertelaers, A.; Nys, V.; Schrauben, M.; Dresselaers, R.

    2013-01-01

    The Belgian Nuclear Research Centre in Mol has been working for several years on the design of a multi-purpose flexible irradiation facility in order to replace the ageing BR2, a multipurpose materials testing reactor (MTR), in operation since 1962. MYRRHA, a flexible fast spectrum research reactor is conceived as an accelerator driven system (ADS), able to operate in sub-critical and critical modes. It contains a proton accelerator of 600 MeV, a spallation target and a multiplying medium with MOX fuel, cooled by liquid lead-bismuth (Pb-Bi). Since February 2011, the Belgian Nuclear Research Centre has engaged in a 'pre-licensing' process with the regulatory authority for an estimated period up to mid 2014. The paper presents on the one hand the objectives of the pre-licensing phase as well as its implementation process and on the other hand, 2 implementing instruments which have been developed by the regulatory authority providing guidance to the designer of MYRRHA in order to meet the pre-licensing phase objectives. The first instrument is a strategic note for the design and operation of MYRRHA where as the second instrument is a guidance document for the format and content of a design options and provisions file (DOPF). Both instruments have been developed taking into account that MYRRHA is an irradiation facility using a Generation IV nuclear power system's type technology (liquid metal cooled fast neutron reactor). The strategic note overview aims to cover the safety approach as well as the security requirements and safeguards obligation applicable to MYRRHA. In particular, in the strategic note, a specific attention has been paid in order to ensure that a safety, security and safeguards integrated approach will drive the development of the MYRRHA design. The safety approach focuses on the safety goals and the minimum safety objectives set by the regulatory authority for this innovative design. The DOPF overview presents its objectives and structure resuming

  7. Licensing procedure for nuclear power in Sweden. An international look with lessons for Sweden

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2011-02-01

    remove the obligation to perform a 'project-EIA' in connection with the licensing procedures. The most important function of the physical plan is to determine how land and water areas should be used. On the one hand, the location and design of plant installations may not deviate from what is prescribed in a detail plan. The plan is legally binding in this negative respect. On the other hand, a plan which points out an area for the purpose of constructing a nuclear power installation is no legal guarantee for acceptance of the site in subsequent decision-making. The location also has to comply with certain special environmental requirements regulated in the Environmental Code. The Government should always decide upon the 'permissibility' on new installations related to nuclear activities (e.g., a new nuclear plant). Basically, the Government decides if the proposed activity on a certain site is allowed or not. A crucial issue concerns the choice of site for the plant. Furthermore, as in physical planning, the government must apply the provisions on efficient management of natural resources, implying, for instance, that certain areas of national interest for other purposes normally must be avoided. In these cases, where the activity requires a license from the Environmental Court according to the Environmental Code, the Court prepares the case for the Government. A nuclear plant is, according to the Environmental Code, an 'environmental hazardous activity'. This means that the plant requires a license from the Environmental Court. The Court normally decides only upon license conditions for emissions etc.; 'best available technology' (BAT) is required according to chapter 2 in the Code. A separate Natura 2000 license is also required. A license is required for a 'nuclear technology activity', including the operation of a nuclear technology installation. The Nuclear Technology Act includes certain basic provisions vaguely prescribing that nuclear technology activities shall

  8. Safety and licensing issues for Indian PHWRs

    International Nuclear Information System (INIS)

    Srinivasan, G.R.; Das, M.

    1997-01-01

    India has achieved competency in design, construction, commissioning and operation of Pressurized Heavy Water Reactor based Nuclear Power Plants and has completed more than 120 reactor operating years with an extremely satisfactory safety record. In this paper, the safety management in NPCIL and operational safety aspects are discussed, licensing and regulatory approach is described and some of the main safety issues for Indian PHWRs are brought out. (author)

  9. Ergonomic requirements for the operation of machines and technical equipment

    Directory of Open Access Journals (Sweden)

    Górny Adam

    2017-01-01

    Full Text Available In order to operate machinery and equipment safely, it is critical for the solutions in place to conform to design-related and operating requirements. Design-related requirements are primarily the responsibility of machine designers/developers and manufacturers. Operating requirements should be satisfied by employers, who are responsible for ensuring safe working conditions for their employees. Under applicable laws, machinery and equipment should be designed, produced and then operated without placing excessive loads on workers and in keeping with machine functionality and intended use. One should also ensure that machinery and equipment can be maintained and adjusted without exposing their operators to hazards. Ergonomic criteria are an integral part of such requirements. They ensure that human users and operators of technical equipment are enabled to function properly. Design-related requirements are viewed as a priority safety consideration. While they facilitate the use of technical tools, the actual safety of employees ultimately depends on the satisfaction of specific requirements during operation.

  10. License - Taxonomy Icon | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Taxonomy Icon License License to Use This Database Last updated : 2013/3/21 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion 2.1 Japan . If you use data from this database, please be sure attribute this database as follows: Taxon...ative Commons Attribution 2.1 Japan is found here . With regard to this database,

  11. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  12. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  13. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations; to be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources; and to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  14. Partner Selection in Technological Licensing Agreements

    DEFF Research Database (Denmark)

    Laursen, Keld; Trombini, Giulia

    This paper investigates the matching of seller and buyer firms in the market for technology licensing. By combining organizational learning theory with the industrial organization approach, we propose a matching model in which technological similarities in terms of relatedness and familiarity work...... that is technologically unrelated, ex ante familiarity with the licensors’ technology is required. We contend also that there is interdependence between technological learning and market competition: if partners are in the same product markets, the likelihood of technology license contractual partnerships decreases...

  15. License - PLACE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PLACE License License to Use This Database Last updated : 2014/07/17 You may use this database...ense terms regarding the use of this database and the requirements you must follow in using this database. The license for this datab...re Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: ... ...re . With regard to this database, you are licensed to: freely access part or whole of this database, and ac...quire data; freely redistribute part or whole of the data from this database; and freely create and distribute database

  16. License - RMG | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RMG License License to Use This Database Last updated : 2013/08/07 You may use this database...se terms regarding the use of this database and the requirements you must follow in using this database. The license for this databas... Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: Ric...Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this database..., and acquire data; freely redistribute part or whole of the data from this database; and freely create and distribute datab

  17. Licensing reform: a case study in public participation in the nuclear field

    International Nuclear Information System (INIS)

    Nordlinger, M.S.

    1993-01-01

    Political process and legal procedures join to accord the public a significant role in nuclear energy policy decision-making in the United States. We changed the two-stage license process in a combined license process with no separation between the construction and operating license, the policy statement requests public comment, allowing days for responses. It is a middle way between information and taking part in decision

  18. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  19. AP1000R licensing and deployment in the United States

    International Nuclear Information System (INIS)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-01-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  20. Testing, licensing, and code requirements for seismic isolation systems (for nuclear power plants)

    International Nuclear Information System (INIS)

    Seidensticker, R.W.

    1987-01-01

    The use of seismic isolation as an earthquake hazard mitigation strategy for nuclear reactor power plants is rapidly receiving interest throughout the world. Seismic isolation has already been used on at least two French PWR plants, was to have been used for plants to be built in Iran, and is under serious consideration for advanced LMR plants (in the US, UK, France, and Japan). In addition, there is a growing use of seismic isolation throughout the world for other critical facilities such as hospitals, emergency facilities, buildings with very high-cost equipment (e.g., computers) and as a strategy to reduce loss of life and expensive equipment in earthquakes. Such a design approach is in complete contrast to the conventional seismic design strategy in which the structure and components are provided with sufficient strength and ductility to resist the earthquake forces and to prevent structural collapses or failure. The use of seismic isolation for nuclear plants can, therefore, be expected to be a significant licensing issue. For isolation, the licensing process must shift away in large measure from the superstructure and concentrate on the behavior of the seismic isolation system. This paper is not intended to promote the advantages of seismic isolation system, but to explore in some detail those technical issues which must be satisfactorily addressed to achieve full licensability of the use of seismic isolation as a viable, attractive and economical alternative to current traditional design approaches. Special problems and topics associated with testing and codes and standards development are addressed. A positive program for approach or strategy to secure licensing is presented