Sample records for repowering

  1. Repowering with natural gas

    International Nuclear Information System (INIS)

    Wilkinson, P.L.

    1992-01-01

    This chapter examines the concept of combined-cycle repowering with natural gas as one possible solution to the impending dilemma facing electric utilities - tight capacity margins in the 1990s and the inordinate expense of traditional powerplants. Combined-cycle repowering refers to the production of electricity through the integration of new and used equipment at an existing site, with the final equipment configuration resembling a new gas-fired combined-cycle unit (i.e., gas turbine, waste heat recovery unit and steam turbine/generator). Through the utilization of improved waste heat recovery and gas-fired equipment, repowering provides both additional capacity and increased generating efficiency. Three modes of repowering are considered: (1) peak turbine repowering refers to the addition of a steam turbine and heat recovery unit to an existing gas turbine, with the efficiency improvement allowing the unit to convert from peaking to baseload operation; (2) heat recovery repowering is the replacement of an old coal boiler with a gas turbine and heat recovery unit, leaving the existing steam turbine in place; and (3) boiler repowering, in which the exhaust from a new gas turbine is fed into an existing coal boiler, replacing existing forced-draft fans and air heaters. These three options are compared with the option of adding new coal-fired boilers on the basis of economics, energy efficiency and environmental impacts

  2. Repowering options for steam power plants

    International Nuclear Information System (INIS)

    Wen, H.; Gopalarathinam, R.

    1992-01-01

    Repowering an existing steam power plant with a gas turbine offers an attractive alternative to a new plant or life extension, especially for unit sizes smaller than 300 MWe. Gas turbine repowering improves thermal efficiency and substantially increases the plant output. Based on recent repowering studies and projects, this paper examines gas turbine repowering options for 100 MWe, 200 MWe and 300 MWe units originally designed for coal firing and currently firing either coal or natural gas. Also discussed is the option for a phased future conversion of the repowered unit to fire coal-derived gas, should there be a fluctuation in the price or availability of natural gas. A modular coal gasification plant designed to shorten the conversion time is presented. Repowering options, performance, costs, and availability impacts are discussed for selected cases

  3. Solar thermal repowering systems integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dubberly, L. J.; Gormely, J. E.; McKenzie, A. W.

    1979-08-01

    This report is a solar repowering integration analysis which defines the balance-of-plant characteristics and costs associated with the solar thermal repowering of existing gas/oil-fired electric generating plants. Solar repowering interface requirements for water/steam and salt or sodium-cooled central receivers are defined for unit sizes ranging from 50 MWe non-reheat to 350 MWe reheat. Finally balance-of-plant cost estimates are presented for each of six combinations of plant type, receiver type and percent solar repowering.

  4. Repowering of wind farms - A case study

    Energy Technology Data Exchange (ETDEWEB)

    Nivedh, B.S. [Quality Engineering and Software Technologies, Bangalore (India); Devi, R.P.K. [College of Engineering. Power Systems Engineering, Guindy (India); Sreevalsan, E. [Gamesa Wind Turbines India Private Limited, Chennai (India)

    2012-07-01

    The main objective of the study is to devise a method for assessing the repowering potential and to improve the energy output from the wind farms and also to understand the impact on the power quality due to repowering. With repowering, the first-generation wind turbines can be replaced with modern multi-megawatt wind turbines. To carry-out the study an old wind farm located at Kayathar, Tamilnadu is selected. The wind farm was commissioned in 1990's with a capacity of 7.35MW, which consists of 36 Wind Turbines each with the capacity of 200kW and 225kW. The present annual energy generation of the wind farm is 7350MWhr with the plant load factor of 11.41%. The intent of this study is to predict the annual energy output of the wind farm after the repowering using WAsP (Wind Atlas Analysis Application Program). Further this study analyses the power quality issues of the various Wind Turbines. In addition, the main feeder, in which the wind farm which is taken for the study also modeled and the impact on power quality due to repowering also studied. Simulations were carried out using MATLAB. The results are analyzed to understand the significance of repowering to overcome the energy crisis of the nation since the best locations for wind in India are occupied by old wind turbines. The following are the observations and conclusions from the above study. Plant load factor (PLF) increased to 24 %, Energy yield increased to more than 4 times and the capacity of the wind farm became double. And in the view of power quality, comparing to the existing Feeder, Repowered Feeder having less reactive power consumption, voltage variations and flickers except the harmonic distortion. (Author)

  5. Wind Power Project Repowering: History, Economics, and Demand (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.

    2015-01-01

    This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

  6. MHD repowering of a 250 MWe unit of the TVA Allen Steam Plant

    International Nuclear Information System (INIS)

    Chapman, J.N.; Attig, R.C.

    1992-01-01

    In this paper coal fired MHD repowering is considered for the TVA Allen Steam Plant. The performance of the repowered plant is presented. Cost comparisons are made of the cost of repowering with MHD versus the cost of meeting similar standards by installing scrubbers and selective catalytic NO x reduction (SCNR). For repowering of a single 250 MW e unit, the costs favor scrubbing and SCNR. If one considers a single repowering of all three 250 MW e units by a single MHD topping cycle and boiler, MHD repowering is more economical. Environmental emissions from the repowered plant are estimated

  7. Wind Power Project Repowering: Financial Feasibility, Decision Drivers, and Supply Chain Effects

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Leventhal, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-12-01

    As wind power facilities age, project owners are faced with plant end of life decisions. This report is intended to inform policymakers and the business community regarding the history, opportunities, and challenges associated with plant end of life actions, in particular repowering. Specifically, the report details the history of repowering, examines the plant age at which repowering becomes financially attractive, and estimates the incremental market investment and supply chain demand that might result from future U.S. repowering activities.

  8. Repowering - Next big thing in India

    International Nuclear Information System (INIS)

    Goyal, Mohit

    2010-01-01

    Indian wind energy sector has seen a CAGR of more than 27% during the period 2002-2007. However, the annual capacity additions has been declining for the past 2 years and recently, India lost one place in the Global ranking on total installed wind capacity to China. While issues like unfavourable tariff, non-uniform state policies, unavailability of evacuation infrastructure, etc. can be attributed to the slower pace of capacity addition, the issue of unavailability of on-shore wind sites with sufficiently high wind velocity is expected to take centre stage in the next 2-3 years. Wind sites with low wind velocity make the investment unattractive to developers. Given the current situation, repowering as an investment option, which has already seen favourable response in countries like Germany and Denmark, would start maturing in India. This paper analyzes the present situation of the wind energy in India, evaluates the different wind energy market segments including repowering market, provides financial highlights of the repowering concept and ends with concluding remarks on major triggers which can set this concept in motion. (author)

  9. Technical and economic assessment of solar hybrid repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Drawings are presented for the repowering project described in SAN--1608-4-1. Reeves Sation No. 2 was selected for study for repowering at 50 percent (25 MWe) using the 10-MW solar central receiver pilot plant preliminary design for Barstow, California. (WHK)

  10. EPA RE-Powering Screening Shapefile

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Center for Program Analysis (CPA) initiated the RE-Powering America’s...

  11. Policies and design elements for the repowering of wind farms: A qualitative analysis of different options

    International Nuclear Information System (INIS)

    Rio, Pablo del; Calvo Silvosa, Anxo; Iglesias Gomez, Guillermo

    2011-01-01

    Repowering of a wind farm is the process of replacing existing wind turbines with new turbines that either have a larger nameplate capacity or more efficiency, resulting in a net increase of the power generated. Although repowering brings, both, social and private benefits, there are also several obstacles to repowering which justify public support. The aim of this paper is to provide an overview and a qualitative analysis of instruments and design options to support repowering of on-shore wind farms. The multicriteria analysis carried out in this paper shows that all instruments have their advantages and drawbacks. However, feed-in tariffs and investment subsidies seem to be particularly appropriate instruments in this regard. Furthermore, we provide an assessment of different design options to promote repowering according to key assessment criteria. The relevance of design elements hinges on the fact that these are the ones directly affecting the variables that are relevant in the decision to repower (capacity factors and investment costs). - Research highlights: → This paper provides a qualitative analysis of instruments and design options to support repowering in wind farms. → The multicriteria analysis has shown that all instruments have their advantages and drawbacks regarding promotion of repowering. → However, feed-in tariffs and investment subsidies seem to be particularly appropriate instruments in this regard. → The choice of design elements within instruments is at least as important to promote repowering as the choice of specific instruments.

  12. Offshore wind farm repowering optimization

    DEFF Research Database (Denmark)

    Hou, Peng; Enevoldsen, Peter; Hu, Weihao

    2017-01-01

    is focused on optimization of offshore wind farm repowering, which is one option for the wind farm owner at end of life for the offshore wind farm. The LCoE is used as the evaluation index to identify whether it is economical to invest in such a way. In an optimized repowering strategy, different types...... of wind turbines are selected to replace the original wind turbines to reconstruct the wind farm, which is demonstrated to be better than the refurbishment approach which replaces the old wind turbines with the same type. The simulations performed in this research reveal that the reconstructed wind farm......, which consists of multiple types of wind turbine, has a smaller LCoE (10.43%) than the refurbishment approach, which shows the superiority of the proposed method. This research contributes an optimization tool to the wind industry, which consequently drives down the cost of energy produced by offshore...

  13. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  14. Optimizing CO2 avoided cost by means of repowering

    International Nuclear Information System (INIS)

    Escosa, Jesus M.; Romeo, Luis M.

    2009-01-01

    Repowering fossil fuel power plants by means of gas turbines has been traditionally considered to increase power output and reduce NO x and SO 2 emissions both at low cost and short outage periods. At present, reduction in CO 2 emissions represents an additional advantage of repowering due to partial fuel shift and overall efficiency increase. This is especially important in existing installations with a CO 2 reduction mandatory that should be carried out in a short time and in a cost-effective manner. Feedwater and parallel repowering schemes have been analysed using thermodynamic, environmental and economic simulations. The objective is not only to evaluate the cost of electricity and the efficiency increase of the overall system, but calculate and minimize the cost of CO 2 avoided as a function of gas turbine power output. It seems that integration of larger gas turbines reduces the overall CO 2 emissions, but there is a compromise between CO 2 reduction due to fuel shift and a optimum integration of waste heat into the power plant to minimize the CO 2 avoided costs. Results highlight the repowering as a suitable technology to reduce 10-30% of CO 2 emissions in existing power plants with cost well below 20 Euro /tCO 2 . It could help to control emissions up to the carbon capture technologies commercial development.

  15. Technical and economic assessment of solar hybrid repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Public Service Company of New Mexico (PNM) has performed a Technical and Economic Assessment of Solar Hybrid Repowering under funding by the Department of Energy (DOE), the Electric Power Research Institute (EPRI), Western Energy Supply and Transmission (WEST) Associates, and a number of southwestern utilities. Solar hybrid repowering involves placement of solar hardware adjacent to and connected to existing gas- and oil-fueled electric generation units to displace some of or all the fossil fuel normally used during daylight hours. The subject study assesses the technical economic viability of the solar hybrid repowering concept within the southwestern United States and the PNM system. This document is a final report on the study and its results. The study was divided into the six primary tasks to allow a systematic investigation of the concept: (1) market survey and cost/benefit analysis, (2) study unit selection, (3) conceptual design and cost estimates, (4) unit economic analysis, (5) program planning, future phases, and (6) program management. Reeves Station No. 2 at Albuquerque, New Mexico, was selected for repowering with a design goal of 50 percent (25 MWe). The solar system design is based on the 10 MW solar central receiver pilot plant preliminary design for Barstow, California. SAN--1608-4-2 contains the technical drawings. (WHK)

  16. Performance Comparison on Repowering of a Steam Power Plant with Gas Turbines and Solid Oxide Fuel Cells

    DEFF Research Database (Denmark)

    Rokni, Masoud

    2016-01-01

    Repowering is a process for transforming an old power plant for greater capacity and/or higher efficiency. As a consequence, the repowered plant is characterized by higher power output and less specific CO2 emissions. Usually, repowering is performed by adding one or more gas turbines into an exi......Repowering is a process for transforming an old power plant for greater capacity and/or higher efficiency. As a consequence, the repowered plant is characterized by higher power output and less specific CO2 emissions. Usually, repowering is performed by adding one or more gas turbines...... into an existing steam cycle which was built decades ago. Thus, traditional repowering results in combined cycles (CC). High temperature fuel cells (such as solid oxide fuel cell (SOFC)) could also be used as a topping cycle, achieving even higher global plant efficiency and even lower specific CO2 emissions....... Decreasing the operating temperature in a SOFC allows the use of less complex materials and construction methods, consequently reducing plant and the electricity costs. A lower working temperature makes it also suitable for topping an existing steam cycle, instead of gas turbines. This is also the target...

  17. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  18. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  19. Vojany Station reconstruction, repowering and expansion assessment: Options, issues and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Coe, W.F. [Southern Electric International, Inc., Atlanta, GA (United States); Griswold, G.H.; Peyton, J.C. [Southern Company Services, Inc., Birmingham, AL (United States)

    1995-12-01

    Recent European community and state specific environmental guideline, legislative, and regulatory activities have led power producers to assess their currently installed generation technologies with regard to clean air compliance strategies. For the application to older generation facilities, the prudence of linking facility rehabilitation with the addition of environmental control systems to repowering options is warranted. Similarly, ongoing privatization efforts emphasize the necessity for sound economic decisions of site specific technological applications that consider maintaining or enhancing thermal efficiencies. Southern Electric International (SEI) has conducted such a feasibility study assessment evaluating the reconstruction, repowering and possible expansion of the Slovensky Energeticky Podnik (SEP) 1320 MWe Vojany Station in the Republic of Slovakia. Alternatives included such technologies as atmospheric fluid bed combustion, furnace and duct sorbent injection, low NOx burners, gas re-burn, selective catalytic reduction, selective non-catalytic reduction, state of the art precipitators and baghouses, wet and dry flue gas desulfurization systems and repowering technologies. In addition, new, turn of the century environmentally plausible and efficient electric power technologies were addressed.

  20. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical power generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)

  1. Repowering of an Existing Power Plant by Means of Gas Turbine and Solid Oxide Fuel Cell

    DEFF Research Database (Denmark)

    Rokni, Masoud

    2014-01-01

    Repowering is a process consisting in a transformation of an old power plant in order to have a greater nameplate capacity or more efficiency, which result in a net increase of power generated. As a consequence of the higher efficiency, the repow ered plant is characterized by higher power output...... and less specific CO2 emissions. Usually, a repowering is performed adding one or more gas turbines to an existing steam cycle which was built decades ago. Thus, traditional repowering results in combine d cycles (CC). High temperature fuel cells (such as SOFC) could also be used as a topping cycle......, reaching global plant efficiency even higher and specific CO2 emissions even lower. Decreasing the operating temperature in a SOFC allows the use of less compl ex materials and construction methods, consequently reducing plant and the electricity cost. A lower working temperature makes it also suitable...

  2. Newman Unit 1 advanced solar repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-04-01

    The five appendices give the selection process and system specification of the Newman Unit 1 solar repowering system, including the conceptual design drawings and diagrams; input data for the simulation program; and a review of the most important characteristics of the existing plant. (LEW)

  3. Repowering analysis: Hanford Generating Project (HGP), Task Order Number 6

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Generating Project (HGP), owned by the Washington Public Power Supply System, consists of two low pressure steam turbines, generators, and associated equipment located adjacent to the Department of Energy's (DOE) N-Reactor. HGP has been able to produce approximately 800 MWe with low pressure steam supplied by N-Reactor. DOE has placed N-Reactor in cold standby status for an undetermined length of time. This results in the idling of the HGP since no alternative source of steam is available. Bonneville Power Administration contracted with Fluor Daniel, Inc. to investigate the feasibility and cost of constructing a new source of steam for (repowering) one of the HGP turbines. The steam turbine is currently operated with 135 psia steam. The turbines can be rebuilt to operate with 500 psia steam pressure by adding additional stages, buckets, nozzles, and diaphragms. Because of the low pressure design, this turbine can never achieve the efficiencies possible in new high pressure turbines by the presences of existing equipment reduces the capital cost of a new generating resource. Five repowering options were investigated in this study. Three cases utilizing gas turbine combined cycle steam generation equipment, one case utilizing a gas fired boiler, and a case utilizing a coal fired boiler. This report presents Fluor Daniel's analysis of these repowering options

  4. Repowering: How to get more from existing resources to meet future power generation needs

    International Nuclear Information System (INIS)

    Bretz, E.A.

    1994-01-01

    Electric-utility executives looking to improve the profitability of their companies often focus on maximizing the output and performance of fossil-fueled powerplants. Repowering is one way to achieve the goal. The marketing and regulatory stimuli behind repowering hinge on the significant costs associated with alternative greenfield power-generation facilities for new capacity and with system-wide compliance with clear-air legislation, as well as the effects of a regulatory-driven industry embroiled in a shifting regulatory and market-driven environment. 3 figs., 2 tabs

  5. Environmental considerations of coal gasification technology and the Wabash River Repowering Project

    International Nuclear Information System (INIS)

    Lessig, W.S.; Frederick, J.D.

    1993-01-01

    The Clean Air Act Amendments of 1990 have mandated a significant reduction in sulfur dioxide emissions. Coal gasification can assist coal burning utilities in meeting this challenge. The use of combustion turbines in the cycle is an important factor in terms of efficiency and pollution control technologies. The gasification process can be utilized in several applications including 'repowering' existing coal-fired facilities as well as new 'greenfield' projects. This paper addresses the environmental benefits of the repowering application at PSI Energy's Wabash River Station. The environmental impacts of air, water, solid waste, trace hazardous air pollutants, and fuel sources are addressed. Specifically, sulfur removal is discussed on both a technical and an economic level

  6. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  7. What Fleets Need to Know About Alternative Fuel Vehicle Conversions, Retrofits, and Repowers

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Gonzales, J.

    2017-10-02

    Many fleet managers have opted to incorporate alternative fuels and advanced vehicles into their lineup. Original equipment manufacturers (OEMs) offer a variety of choices, and there are additional options offered by aftermarket companies. There are also a myriad of ways that existing vehicles can be modified to utilize alternative fuels and other advanced technologies. Vehicle conversions and retrofit packages, along with engine repower options, can offer an ideal way to lower vehicle operating costs. This can result in long term return on investment, in addition to helping fleet managers achieve emissions and environmental goals. This report summarizes the various factors to consider when pursuing a conversion, retrofit, or repower option.

  8. What Fleets Need to Know About Alternative Fuel Vehicle Conversions, Retrofits, and Repowers

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gonzales, John [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-10-17

    Many fleet managers have opted to incorporate alternative fuels and advanced vehicles into their lineup. Original equipment manufacturers (OEMs) offer a variety of choices, and there are additional options offered by aftermarket companies. There are also a myriad of ways that existing vehicles can be modified to utilize alternative fuels and other advanced technologies. Vehicle conversions and retrofit packages, along with engine repower options, can offer an ideal way to lower vehicle operating costs. This can result in long term return on investment, in addition to helping fleet managers achieve emissions and environmental goals. This report summarizes the various factors to consider when pursuing a conversion, retrofit, or repower option.

  9. Improved repowering techniques for power plants

    DEFF Research Database (Denmark)

    Houbak, Niels; Andersen, Simon E.; Petersen, Stiig Bo

    1998-01-01

    Repowering of existing coal-fired power plants is often accomplished by adding gas turbines. In this paper we assume that the gas turbine exhaust is used for feed water preheating.Typical gas turbine exhaust temperatures are in the range 450-600C whereas typical boiler inlet temperatures are 250......-300C. The big difference in temperature between exhaust and water prevents an efficient exchange of heat. One way to lower the exhaust temperature is to expand the gas to sub atmospheric pressure. The result is a 50% increase in possible installed gas turbine power....

  10. Technical considerations in repowering a nuclear plant for fossil fueled operation

    International Nuclear Information System (INIS)

    Patti, F.J.

    1996-01-01

    Repowering involves replacement of the reactor by a fossil fuel source of steam. This source can be a conventional fossil fueled boiler or the heat recovery steam generator (HRSG) on a gas turbine exhaust. The existing steam turbine plant is used to the extent possible. Alternative fuels for repowering a nuclear plant are coal, natural gas and oil. In today's world oil is not usually an alternative. Selection of coal or natural gas is largely a matter of availability of the fuel near the location of the plant. Both the fossil boiler and the HRSG produce steam at higher pressures and temperatures than the throttle conditions for a saturated steam nuclear turbine. It is necessary to match the steam conditions from the new source to the existing turbine as closely as possible. Technical approaches to achieve a match range from using a topping turbine at the front end of the cycle to attemperation of the throttle steam with feedwater. The electrical output from the repowered plant is usually greater than that of the original nuclear fueled design. This requires consideration of the ability to use the excess electricity. Interfacing of the new facility with the existing turbine plant requires consideration of facility layout and design. Site factors must also be considered, especially for a coal fired boiler, since rail and coal handling facilities must be added to a site for which these were not considered. Additional site factors that require consideration are ash handling and disposal

  11. Evaluation of Suitability of Selected Set of Coal Plant Sites for Repowering with Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Belles, Randy [ORNL; Copinger, Donald A [ORNL; Mays, Gary T [ORNL; Omitaomu, Olufemi A [ORNL; Poore III, Willis P [ORNL

    2013-03-01

    This report summarizes the approach that ORNL developed for screening a sample set of small coal stations for possible repowering with SMRs; the methodology employed, including spatial modeling; and initial results for these sample plants. The objective in conducting this type of siting evaluation is to demonstrate the capability to characterize specific sample coal plant sites to identify any particular issues associated with repowering existing coal stations with SMRs using OR-SAGE; it is not intended to be a definitive assessment per se as to the absolute suitability of any particular site.

  12. Re-powering and site recycling in a competitive environment

    International Nuclear Information System (INIS)

    Taylor, A.; Kahn, E.P.

    1991-03-01

    Re-powering and site recycling are strategies designed to expand electric generating capacity by using depreciated assets. The resource base for the these strategies is large. By 1995, over 170,000 MW of fossil-fired capacity will be in excess of thirty years old, and approaching the end of its conventional economic lifetime. This paper explores how these assets might be developed using competitive market forces. While some re-powering is being pursued under traditional ratebase regulation, there are four other generic alternatives. These are: (1) utility investment at fixed prices with regulatory pre-approval, (2) utility investment under competitive bidding, (3) utility leasing for private producer development, and (4) utility sale of sites for private producer development. Issues associated with each alternative are explored and illustrated with examples. State regulatory policy will be the critical determinant of whether a market develops for depreciated power plants. Financial incentives will stimulate utilities to re-deploy depreciated assets. This means some form of profit-sharing between customers and shareholders of the grains from asset sales. Different approaches to profit sharing are reviewed. These developments are still in an experimental state, however, and no single approach appears to have emerged as a dominant trend. 36 refs., 1 tab

  13. Technical and economic assessment of solar hybrid repowering: conceptual design and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    This volume contains the appendix to the conceptual design and cost estimate report on solar repowering the Reeves Unit No. 2 power plant in Albuquerque, New Mexico. Included are the engineering drawings and the work breakdown structure estimate report. (WHK)

  14. From troubled kid to star performers - On the repowering of a biogas plant; Vom Sorgenkind zum Musterknaben. Ueber das Repowering einer Biogasanlage

    Energy Technology Data Exchange (ETDEWEB)

    Gress, Hans-Werner [ABO Wind AG, Wiesbaden (Germany)

    2011-07-01

    In 2001, the biogas plant in Samswegen (Federal Republic of Germany) has been successfully inaugurated. The plant proposed by Schmack AG (Schwandorf, Federal Republic of Germany) consisted of two horizontal plug flow digesters and three storage-flow digesters. Due to incidents this concept was not feasible in practical operation. Under this aspect, the author of the contribution under consideration reports on the repowering of a biogas plant. This includes a retrofit with necessary components such as a gas torch, a gas cooler and external desulfurization. Similarly, the solids metering was renewed. The recirculation could be reduced by 80 %.

  15. Propulsive machinery selection for repowering of an old patrol craft - A case study

    Science.gov (United States)

    Rahman, M. Muzibur; Mridha, A. H. Yusuf; Ahsan, Kazi Sakib

    2017-12-01

    This paper presents a case study of repowering peculiarities in relation to an old vessel. The vessel selected for study was designed for cruising speed of 15 knots. Over the years of operation the vessel's cruising speed reduced to about 8 knots. So, the owner wanted to repower it to have a fresh tenure of life and the work was given to a shipyard. But after replacement of old two engines by new engines of same power with different model, the performance of the vessel was not satisfactory. In the present paper, the problem is studied with comprehensive calculations of hydrostatic particulars and resistance of the ship. The analysis is carried out in respect of engine specifications, gear ratios, propeller design etc. and found that the operating ranges of new engines are not at par with the old engines. The new engine does not also match with old propeller. At this situation, comparative studies have determined that among all possible solutions redesign of propeller is the most suitable one and cost effective.

  16. 76 FR 13349 - Notice of Funding Availability (NOFA) for Repowering Assistance Payments to Eligible Biorefineries

    Science.gov (United States)

    2011-03-11

    ... Funding Availability (NOFA) for Repowering Assistance Payments to Eligible Biorefineries AGENCY: Rural... announces the acceptance of applications for payments to eligible biorefineries to encourage the use of... operation of these eligible biorefineries. To be eligible for payments, biorefineries must have been in...

  17. Hybrid repowering of transformers using aramids; Repotenciacao hibrida de transformadores com utilizacao de aramida

    Energy Technology Data Exchange (ETDEWEB)

    Neri Junior, Almir Laranjeira; Correia, Fidelis Botelho [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2010-01-15

    Santiago substation of the PETROBRAS, operated with two transformers fabricated in 1971. To preserve the reliability of power supply, it was relaborated a reformation and repowering project of the equipment using aramids, a special polymeric material. This paper describes the phases of the project, and presents the benefits obtained, and also the characteristics of the electric system of the production unit. (author)

  18. AC transmission network expansion planning considering circuits repowering and location of capacitors

    OpenAIRE

    Jaime A. López-López; Diego A. Tejada-Arango; Jesús M. López-Lezama

    2016-01-01

    This paper deals with the Transmission Network Expansion Planning (TNEP) problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To ...

  19. Fiscal 1999 basic survey report for promotion of joint implementation. Plan for repowering Ashuganji thermal power station; 1999 nendo Ashuganji karyoku hatsudensho no repowering keikaku chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    A study is conducted of a plan to repower the Ashuganji thermal power station, the People's Republic of Bangladesh, with the plan to be connected to the clean development mechanism (CDM). For conversion of the existing No. 3, No. 4, and No. 5 generators (each outputting 150MW) into full fired heat recovery combined cycle generators, 31MW gas turbines are added, one to each of the three. The construction cost is calculated to be 14,000-million yen. Fuel (natural gas) will be saved by 28kt/year/generator, the three saving 2.1-million tons in total in 25 years. There will be a CO2 reduction of 77kt/year/generator, the total reduction to be 5.8-million tons in 25 years for the three generators. Then payback is assessed. In the main case (with the repowering-created increase in output to be used to cover the current power supply shortage), where the internal rate of return of 8.09% is much lower than the discount rate of 15.5% during the 10-year period for payback in case of financing by private funds, the discounted present worth is predicted to be negative and then the project is not feasible. Since there will be no problems about the repayment of borrowed money, however, it is hoped that low-interest special yen credit will be granted for the elimination of chronic power shortage. When it comes to international emission trading (550 yen/ton of CO2), payback is again found to be impossible. (NEDO)

  20. Have Local Government and Public Expectations of Wind Energy Project Benefits Been Met? Implications for Repowering Schemes

    Czech Academy of Sciences Publication Activity Database

    Frantál, Bohumil

    2014-01-01

    Roč. 16, č. 3 (2014) ISSN 1523-908X R&D Projects: GA MŠk EE2.3.20.0025 Institutional support: RVO:68145535 Keywords : wind energy * local acceptance * repowering * outcome fairness Subject RIV: DE - Earth Magnetism, Geodesy, Geography Impact factor: 1.510, year: 2014 http://www.tandfonline.com/doi/full/10.1080/1523908X.2014.936583#.VE421xZh4cs

  1. Analysis of Renewable Energy Policies Related to Repowering the Wind Energy Sector: the Spanish Case

    OpenAIRE

    Rodriguez, Roberto; Rodríguez Monroy, Carlos; Rodriguez, Rubén; Calvo Narvaez, Felix

    2013-01-01

    In countries that started early with wind energy, the old wind turbines were located in places where the wind is often very good. Since the best places in which the wind is concerned are occupied by old wind turbines (with lower capacity than the more recent ones) the trend is to start replacing old turbines with new ones. With repowering, the first generation of wind turbines can be replaced by modern multi-megawatt wind turbines. The aim of this article is to analyze energy policies in ...

  2. Survey of consolidation for gas turbine re-powering combined WPP (waste power plant) project; Gas turbine repowering haikibutsu fukugo hatsuden system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report describes the survey of gas turbine re-powering combined WPP (or super WPP), which was commercialized by Gunma Prefecture for the first time as an electric power wholesaler in Japan. An outline of the survey is introduced. The system optimization for the commercialization of WPP was studied by considering waste as un-utilized energy. A successful condition and preparation method of the commercialization of a public power plant was also studied, which is a combination of the garbage collection business of a local government and an electric power generation business of a municipal company. For the introduction of the aforementioned system, the problems and supporting methods were studied by making allowance for the profitability of the WPP introduction, because they also need to deliberate it from the economical point of view as electric power companies. Based on the results of foregoing items, commercialization plans, problems encountered from the construction phase through the maintenance and service phase, and the supporting method were arranged. 30 figs., 18 tabs.

  3. Optimal control of a repowered vehicle: Plug-in fuel cell against plug-in hybrid electric powertrain

    Energy Technology Data Exchange (ETDEWEB)

    Tribioli, L., E-mail: laura.tribioli@unicusano.it; Cozzolino, R. [Dept. of Industrial Engineering, University of Rome Niccolo’ Cusano (Italy); Barbieri, M. [Engineering Dept., University of Naples Parthenope, Centro Direzionale-Isola C4, 80143 Naples (Italy)

    2015-03-10

    This paper describes two different powertrain configurations for the repowering of a conventional vehicle, equipped with an internal combustion engine (ICE). A model of a mid-sized ICE-vehicle is realized and then modified to model both a parallel plug-in hybrid electric powertrain and a proton electrolyte membrane (PEM) fuel cell (FC) hybrid powertrain. The vehicle behavior under the application of an optimal control algorithm for the energy management is analyzed for the different scenarios and results are compared.

  4. EPA RE-Powering America's Lands: Kansas City Municipal Farm Site ₋ Biomass Power Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-01-01

    Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing biomass at the Kansas City, Missouri, Municipal Farm site, a group of City-owned properties, is explored. The study that none of the technologies we reviewed--biomass heat, power and CHP--are economically viable options for the Municipal Farms site. However, if the site were to be developed around a future central biomass heating or CHP facility, biomass could be a good option for the site.

  5. Optimal control of a repowered vehicle: Plug-in fuel cell against plug-in hybrid electric powertrain

    International Nuclear Information System (INIS)

    Tribioli, L.; Cozzolino, R.; Barbieri, M.

    2015-01-01

    This paper describes two different powertrain configurations for the repowering of a conventional vehicle, equipped with an internal combustion engine (ICE). A model of a mid-sized ICE-vehicle is realized and then modified to model both a parallel plug-in hybrid electric powertrain and a proton electrolyte membrane (PEM) fuel cell (FC) hybrid powertrain. The vehicle behavior under the application of an optimal control algorithm for the energy management is analyzed for the different scenarios and results are compared

  6. Map-Based Repowering and Reorganization of a Wind Resource Area to Minimize Burrowing Owl and Other Bird Fatalities

    Directory of Open Access Journals (Sweden)

    Lee Neher

    2009-10-01

    Full Text Available Wind turbines in the Altamont Pass Wind Resource Area (Alameda/Contra Costa Counties, California, USA generate about 730 GWh of electricity annually, but have been killing thousands of birds each year, including >2,000 raptors and hundreds of burrowing owls. We have developed collision hazard maps and hazard ratings of wind turbines to guide relocation of existing wind turbines and careful repowering to modern turbines to reduce burrowing owl fatalities principally, and other birds secondarily. Burrowing owls selected burrow sites lower on slopes and on smaller, shallower slopes than represented by the average 10 × 10 m2 grid cell among 187,908 grid cells sampled from 2,281,169 grid cells comprising a digital elevation model (DEM of the study area. Fuzzy logic and discriminant function analysis produced likelihood surfaces encompassing most burrowing owl burrows within a fraction of the study area, and the former corresponded with burrowing owl fatalities and the latter with other raptor fatalities. Our ratings of wind turbine hazard were more predictive of burrowing owl fatalities, but would be more difficult to implement. Careful repowering to modern wind turbines would most reduce fatalities of burrowing owls and other birds while adding about 1,000 GWh annually toward California’s 33% Renewable Portfolio Standard.

  7. Map-based repowering and reorganization of a wind resource area to minimize burrowing owl and other bird fatalities

    Energy Technology Data Exchange (ETDEWEB)

    Smallwood, K. S. [Research Ecologist, 3108 Finch Street, Davis, CA 95616 (United States); Neher, L. [Gis Specialist, Neher Consulting, 7241 34th Street, North Highlands, CA 95660 (United States); Bell, D. A. [East Bay Regional Park District, 2950 Peralta Oaks Court, Oakland, CA 94605-0381 (United States)

    2009-07-01

    Wind turbines in the Altamont Pass Wind Resource Area (Alameda/Contra Costa Counties, California, USA) generate about 730 GWh of electricity annually, but have been killing thousands of birds each year, including >2,000 raptors and hundreds of burrowing owls. We have developed collision hazard maps and hazard ratings of wind turbines to guide relocation of existing wind turbines and careful repowering to modern turbines to reduce burrowing owl fatalities principally, and other birds secondarily. Burrowing owls selected burrow sites lower on slopes and on smaller, shallower slopes than represented by the average 10 x 10 m{sup 2} grid cell among 187,908 grid cells sampled from 2,281,169 grid cells comprising a digital elevation model (DEM) of the study area. Fuzzy logic and discriminant function analysis produced likelihood surfaces encompassing most burrowing owl burrows within a fraction of the study area, and the former corresponded with burrowing owl fatalities and the latter with other raptor fatalities. Our ratings of wind turbine hazard were more predictive of burrowing owl fatalities, but would be more difficult to implement. Careful repowering to modern wind turbines would most reduce fatalities of burrowing owls and other birds while adding about 1,000 GWh annually toward California's 33% Renewable Portfolio Standard. (author)

  8. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  9. Externally-fired combined cycle: An effective coal fueled technology for repowering and new generation

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, L.E.; Bary, M.R. [Black and Veatch, Kansas City, MO (United States); Gray, K.M. [Pennsylvania Electric Co., Johnstown, PA (United States); LaHaye, P.G. [Hague International, South Portland, ME (United States)

    1995-06-01

    The Externally-Fired Combined Cycle (EFCC) is an attractive emerging technology for powering high efficiency combined gas and steam turbine cycles with coal or other ash bearing fuels. In the EFCC, the heat input to a gas turbine is supplied indirectly through a ceramic air heater. The air heater, along with an atmospheric coal combustor and ancillary equipment, replaces the conventional gas turbine combustor. A steam generator located downstream from the ceramic air heater and steam turbine cycle, along with an exhaust cleanup system, completes the combined cycle. A key element of the EFCC Development Program, the 25 MMBtu/h heat-input Kennebunk Test Facility (KTF), has recently begun operation. The KTF has been operating with natural gas and will begin operating with coal in early 1995. The US Department of Energy selected an EFCC repowering of the Pennsylvania Electric Company`s Warren Station for funding under the Clean Coal Technology Program Round V. The project focuses on repowering an existing 48 MW (gross) steam turbine with an EFCC power island incorporating a 30 MW gas turbine, for a gross power output of 78 MW and a net output of 72 MW. The net plant heat rate will be decreased by approximately 30% to below 9,700 Btu/kWh. Use of a dry scrubber and fabric filter will reduce sulfur dioxide (SO{sub 2}) and particulate emissions to levels under those required by the Clean Air Act Amendments (CAAA) of 1990. Nitrogen oxides (NO{sub x}) emissions are controlled by the use of staged combustion. The demonstration project is currently in the engineering phase, with startup scheduled for 1997. This paper discusses the background of the EFCC, the KTF, the Warren Station EFCC Clean Coal Technology Demonstration Project, the commercial plant concept, and the market potential for the EFCC.

  10. Policy for rekindling and re-powering of small scale hydroelectric power plants; Politica de rejuvenescimento e repotenciacao de PCH`s

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Wanderley I. de [Companhia Paulista de Forca e Luz (CPFL), Campinas, SP (Brazil). Div. de Geracao

    1997-12-31

    The demand of electric energy comes increasing gradually and the offer of energy with of growth of the market, becomes a product, a great concern. In this matter Small Hydroelectric Power Plant SHP`s can be fundamental to offer support to the electric section, but these small sources of energy need to be adapting rekindling and repowering, being used of new market technologies and of economic studies that can give reliability and speed in the evaluations of the processes. (author)

  11. EPA RE-Powering Mapper: Alternative Energy Potential at Cleanup Sites

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management??s (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. EPA developed national level site screening criteria in partnership with the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) for wind, solar, biomass, and geothermal facilities. While the screening criteria demonstrate the potential to reuse contaminated land for renewable energy facilities, the criteria and data are neither designed to identify the best sites for developing renewable energy nor all-inclusive. Therefore, more detailed, site-specific analysis is necessary to identify or prioritize the best sites for developing renewable energy facilities based on the technical and economic potential. Please note that these sites were only pre-screened for renewable energy potential. The sites were not evaluated for land use constraints or current on the ground conditions. Additional research and site-specific analysis are needed to verify viability for renewable energy potential at a given site.

  12. Report of year 2000 version on feasibility study for joint implementation. Repowering project of Ashuganji Thermal Power Station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the repowering project of Ashuganji Thermal Power Station in the People's Republic of Bangladesh to link the project to the clean development mechanism (CDM). The project calls for adding gas turbines respectively having output of 31 MW to the existing units No. 3, 4 and 5 (each having an output of 150 MW) to make the plant into the waste gas re-combustion type compound cycle system. The construction cost would be 140 billion yen. The annual reduction of fuel per unit would be 28 kt, which can result in reduction of 2.1 million tons from the three units over the period of 25 years. The annual reduction in CO2 emission from a unit would be 77 kt, resulting in reduction of 5.8 million tons from the three units over 25 years. The return on investment effect was evaluated. In the main case (the output increase as a result of the repowering is used to supplement the current power supply shortage), the required period to recover the investment will be ten years on the basis of introducing private sector fund, but the internal profitability would be 8.09%, being far below the discount rate of 15%, and the current discount worth is also negative, hence the project would not be feasible. However, since there are no problems in repaying the loans, application of the low-interest special Yen loan is desired to eliminate the state of chronic power shortage. The discharge right transaction case (550 yen/ton of CO2) was also found unworkable to recover the investment. (NEDO)

  13. Report of year 2000 version on feasibility study for joint implementation. Repowering project of Ashuganji Thermal Power Station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the repowering project of Ashuganji Thermal Power Station in the People's Republic of Bangladesh to link the project to the clean development mechanism (CDM). The project calls for adding gas turbines respectively having output of 31 MW to the existing units No. 3, 4 and 5 (each having an output of 150 MW) to make the plant into the waste gas re-combustion type compound cycle system. The construction cost would be 140 billion yen. The annual reduction of fuel per unit would be 28 kt, which can result in reduction of 2.1 million tons from the three units over the period of 25 years. The annual reduction in CO2 emission from a unit would be 77 kt, resulting in reduction of 5.8 million tons from the three units over 25 years. The return on investment effect was evaluated. In the main case (the output increase as a result of the repowering is used to supplement the current power supply shortage), the required period to recover the investment will be ten years on the basis of introducing private sector fund, but the internal profitability would be 8.09%, being far below the discount rate of 15%, and the current discount worth is also negative, hence the project would not be feasible. However, since there are no problems in repaying the loans, application of the low-interest special Yen loan is desired to eliminate the state of chronic power shortage. The discharge right transaction case (550 yen/ton of CO2) was also found unworkable to recover the investment. (NEDO)

  14. AC transmission network expansion planning considering circuits repowering and location of capacitors

    Directory of Open Access Journals (Sweden)

    Jaime A. López-López

    2016-07-01

    Full Text Available This paper deals with the Transmission Network Expansion Planning (TNEP problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To take into account these last ones an AC model of the transmission network is considered. The solution of the proposed model is carried out using a Hybrid Genetic Algorithm. Results are compared and validated with previous works in the technical literature. The test systems used are the Garver system and IEEE 24 bus system. The results obtained in both systems showed that the inclusion of the non-conventional candidates, proposed in this paper, allows to reduce the cost of network expansion. This fact may be useful as an indicator for the system planner to consider new possibilities in the expansion studies.

  15. Wabash River Coal Gasification Combined Cycle Repowering Project: Clean Coal Technology Program

    International Nuclear Information System (INIS)

    1993-05-01

    The proposed project would result in a combined-cycle power plant with lower emissions and higher efficiency than most existing coal-fired power plants of comparable size. The net plant heat rate (energy content of the fuel input per useable electrical generation output; i.e., Btu/kilowatt hour) for the new repowered unit would be a 21% improvement over the existing unit, while reducing SO 2 emissions by greater than 90% and limiting NO x emissions by greater than 85% over that produced by conventional coal-fired boilers. The technology, which relies on gasified coal, is capable of producing as much as 25% more electricity from a given amount of coal than today's conventional coal-burning methods. Besides having the positive environmental benefit of producing less pollutants per unit of power generated, the higher overall efficiency of the proposed CGCC project encourages greater utilization to meet base load requirements in order to realize the associated economic benefits. This greater utilization (i.e., increased capacity factor) of a cleaner operating plant has global environmental benefits in that it is likely that such power would replace power currently being produced by less efficient plants emitting a greater volume of pollutants per unit of power generated

  16. Report on the basic survey on promotion of joint project implementation in fiscal 1998. 'Repowering of three gas-based thermal power plants'; 1998 nendo kyodo jisshi nado suishin kiso chosa. Gas base karyoku hatsudensho no repowering (3 plant)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective of reactivating and reduction of emission of greenhouse effect gases, investigations and discussions were given on repowering three thermal power plants in the Federal Republic of Russia. The project on Kirishi Power Station calls for withdrawal of 1800-MW capacity out of the existing generation capacity of 2100 MW, and installation of a combined cycle power plant having an output capacity of 1950 MW. The existing 300-MW capacity will be used mainly for heat supply. At Puskovskaya Power Plant, a combined cycle power plant with a capacity of 1170 MW will be built newly. Iriklinskaya Power Station will have the existing plant removed, where a new combined cycle power plant with a capacity of 2340 MW will be constructed. As a result of the discussions, the cumulative reduction amount of CO2 emission will reach 44.67 million tons, 10.53 million tons, and 89.94 million tons respectively, and the investment return rate before tax will be 11.35%, 11.85% and 11.18% respectively. This project is expected to contribute largely to reduction of CO2 emission, and at the same time strengthen the foundation of the power plant management. (NEDO)

  17. Promotion of the formation of environmentally friendly energy community (FY 2000). Demonstration of the gas turbine repowering waste combined power generation technology; 2000 nendo kankyo chowagata energy community keisei sokushin seika hokokusho. Gas turbine repowering haikibutsu fukugo hatsuden gijutsu jissho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Demonstrative operation was conducted of the super waste power generation system in which the low temperature steam generated in waste incinerator is raised in temperature using the combustion exhaust gas emitted after the power generation using another gas turbine for conducting the steam turbine power generation with high efficiency. The FY 2000 results were summed up. In the demonstrative operation, operation and data acquisition/analysis were conducted following the previous fiscal year by 25MW class gas turbine repowering waste combined power generation facilities (Takahama power plant). Further, four years after the start of operation, the secular variation was studied by disassembly/inspection of equipment. As a result of the operation, the thermal efficiency was approximately 35%, much higher than the existing waste power generation. It was verified that the power system was maintained by the same maintenance as that of the ordinary power system. Moreover, the important point of this system is that no special corrosion resistant materials are used and that the high-efficiency waste power generation was demonstrated by combining the existing equipment. It can be said that the super waste power system has high qualities for forming energy community as a regionally dispersed stabilized power source. (NEDO)

  18. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  19. Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.

  20. Feasibility Study of Anaerobic Digestion of Food Waste in St. Bernard, Louisiana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to re-use contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former Kaiser Aluminum Landfill in St. Bernard Parish, Louisiana, was selected for a feasibility study under the program. Preliminary work focused on selecting a biomass feedstock. Discussions with area experts, universities, and the project team identified food wastes as the feedstock and anaerobic digestion (AD) as the technology.

  1. Feasibility Study of Economics and Performance of Biopower at the Chanute Air Force Base in Rantoul, Illinois. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Scarlata, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chanute Air Force Base site in Rantoul, Illinois, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this study was to assess the site for a possible biopower system installation and estimate the cost, performance, and impacts of different biopower options.

  2. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tronox Facility in Savannah, Georgia. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tronox Facility site in Savannah, Georgia, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  3. Feasibility Study of Economics and Performance of Biomass Power Generation at the Former Farmland Industries Site in Lawrence, Kansas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Tomberlin, G.; Mosey, G.

    2013-03-01

    Under the RE-Powering America's Land initiative, the U.S. Environmental Protection Agency (EPA) provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of biomass renewable energy generation at the former Farmland Industries site in Lawrence, Kansas. Feasibility assessment team members conducted a site assessment to gather information integral to this feasibility study. Information such as biomass resources, transmission availability, on-site uses for heat and power, community acceptance, and ground conditions were considered.

  4. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Brisbane Baylands Brownfield Site in Brisbane, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Brisbane Baylands site in Brisbane, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  5. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kolthoff Landfill in Cleveland, Ohio. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), Region 5, in accordance with the RE-Powering America's Land initiative, selected the Kolthoff Landfill site in Cleveland, Ohio, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  6. Feasibility Study for the Ivano-Frankivsk District Heating Repowering: Analysis of Options

    Energy Technology Data Exchange (ETDEWEB)

    Markel, L.; Popelka, A.; Laskarevsky, V.

    2002-03-20

    Part of the U.S. Initiative on Joint Implementation with the Ukraine Inter-Ministerial Commission on Climate Change, financed by the US Department of Energy. The project was implemented by a team consisting of the US company SenTech, Inc. and the Ukrainian company Esco-West. The main objective of the effort was to assess available alternatives of Ivano-Frankivsk (I-F) District Heating repowering and provide information for I-F's investment decision process. This study provides information on positive and negative technical and economic aspects of available options. Three options were analyzed for technical merit and economic performance: 1. Installation of cogeneration system based on Gas Turbine (GT) and Heat Recovery Heat Exchanger with thermal capacity of 30 MW and electrical capacity of 13.5 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. Equipment in this Option was sized for longest operating hours, about 8000 based on the available summer baseload. 2. Installation of Gas Turbine Combined Cycle (GTCC) and Heat Recovery Steam Generator (HRSG) with thermal capacity 45 MW and electrical capacity of 58.7 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. The equipment was sized for medium, shoulder season thermal load, and some cooling was assumed during the summer operation for extension of operating hours for electricity production. 3. Retrofit of six existing boilers (NGB) with total thermal capacity of 255.9 MW by installation of modern control system and minor upgrades. This option assumes only heat production with minimum investment. The best economic performance and the largest investment cost would result from alternative GTCC. This alternative has positive Net Present Value (NPV) with discount rate lower than about 12%, and has IRR slightly above 12%. The

  7. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kerr McGee Site in Columbus, Mississippi. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Kerr McGee site in Columbus, Mississippi, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  8. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Ft. Hood Military Base Outside Killeen, Texas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Geiger, J.; Lisell, L.; Mosey, G.

    2013-10-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  9. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Crazy Horse Landfill Site in Salinas, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Crazy Horse Landfill site in Salinas, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, operation and maintenance requirements, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  10. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Chino Mine in Silver City, New Mexico. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Chino Mine site in Silver City, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  11. RE-Powering’s Electronic Decision Tree

    Science.gov (United States)

    Developed by US EPA's RE-Powering America's Land Initiative, the RE-Powering Decision Trees tool guides interested parties through a process to screen sites for their suitability for solar photovoltaics or wind installations

  12. Staged fluidized-bed coal combustor for boiler retrofit

    International Nuclear Information System (INIS)

    Rehmat, A.; Dorfman, L.; Shibayama, G.; Waibel, R.

    1991-01-01

    The Advanced Staged Fluidized-Bed Coal Combustion System (ASC) is a novel clean coal technology for either coal-fired repowering of existing boilers or for incremental power generation using combined-cycle gas turbines. This new technology combines staged combustion for gaseous emission control, in-situ sulfur capture, and an ash agglomeration/vitrification process for the agglomeration/vitrification of ash and spent sorbent, thus rendering solid waste environmentally benign. The market for ASC is expected to be for clean coal-fired repowering of generating units up to 250 MW, especially for units where space is limited. The expected tightening of the environmental requirements on leachable solids residue by-products could considerably increase the marketability for ASC. ASC consists of modular low-pressure vessels in which coal is partially combusted and gasified using stacked fluidized-bed processes to produce low-to-medium-Btu, high-temperature gas. This relatively clean fuel gas is used to repower/refuel existing pulverized-coal, natural gas, or oil-fired boilers using bottom firing and reburning techniques. The benefits of ASC coal-fired repowering include the ability to repower boilers without obtaining additional space while meeting the more stringent environmental requirements of the future. Low NO x , SO x , and particulate levels are expected while a nonleachable solid residue with trace metal encapsulation is produced. ASC also minimizes boiler modification and life-extension expenditures. Repowered efficiencies can be restored to the initial operating plant efficiency, and the existing boiler capacity can be increased by 10%. Preliminary cost estimates indicate that ASC will have up to a $250/kW capital cost advantage over existing coal-fired repowering options. 4 figs., 4 tabs

  13. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Sky Park Landfill Site in Eau Claire, Wisconsin. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Sky Park Landfill site in Eau Claire, Wisconsin, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  14. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Fort Ord Army Base Site in Marina, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Fort Ord Army Base (FOAB) site in Marina, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  15. Bainbridge Energy Challenge. Energy efficiency and conservation block grant (EECBG) - Better buildings neighborhood program. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Kraus, Yvonne X.

    2014-02-14

    RePower Bainbridge and Bremerton (RePower) is a residential energy-efficiency and conservation program designed to foster a sustainable, clean, and renewable energy economy. The program was a 3.5 year effort in the cities of Bainbridge Island and Bremerton, Washington, to conserve and reduce energy use, establish a trained home performance trade ally network, and create local jobs. RePower was funded through a $4.8 million grant from the US Department of Energy, Better Buildings Program. The grant’s performance period was August 1, 2010 through March 30, 2014.

  16. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Price Landfill Site in Pleasantville, New Jersey. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Price Landfill site in Pleasantville, New Jersey, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  17. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tower Road Site in Aurora, Colorado. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Van Geet, O.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tower Road site in Aurora, Colorado, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  18. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Standard Chlorine of Delaware Superfund Site in Delaware City, Delaware. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Standard Chlorine of Delaware site in Delaware City, Delaware, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  19. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Bethlehem Steel Plant Brownfield Site in Lackawanna, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Bethlehem Steel Plant site in Lackawanna, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  20. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Peru Mill Industrial Park in the City of Deming, New Mexico. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Peru Mill Industrial Park site in the City of Deming, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  1. Feasibility Study of Economics and Performance of Geothermal Power Generation at the Lakeview Uranium Mill Site in Lakeview, Oregon. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Hillesheim, M.; Mosey, G.

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Lakeview Uranium Mill site in Lakeview, Oregon, for a feasibility study of renewable energy production. The EPA contracted with the National Renewable Energy Laboratory (NREL) to provide technical assistance for the project. The purpose of this report is to describe an assessment of the site for possible development of a geothermal power generation facility and to estimate the cost, performance, and site impacts for the facility. In addition, the report recommends development pathways that could assist in the implementation of a geothermal power system at the site.

  2. Feasibility Study of Economics and Performance of Solar Photovoltaics at the TechCity East Campus Resource Conservation and Recovery Act Site in Kingston, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, James [National Renewable Energy Lab. (NREL), Golden, CO (United States); Geiger, Jesse W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, Gail [National Renewable Energy Lab. (NREL), Golden, CO (United States); Healey, Victoria [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the TechCity East Campus site in Kingston, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  3. Pre-Feasibility Analysis of Pellet Manufacturing on the Former Loring Air Force Base Site. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, R.; Mosey, G.

    2014-04-01

    The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. This site, in Limestone, Maine -- formerly the location of the Loring Air Force Base but now owned by the Aroostook Band of Micmac -- was selected for the potential to produce heating pellets from woody feedstock. Biomass was chosen as the renewable energy resource to evaluate based on abundant woody-biomass resources available in the area. NREL also evaluates potential savings from converting existing Micmac property from oil-fired heating to pellet heating.

  4. Assessment of Optical Turbulence Profiles Derived From Probabilistic Climatology

    Science.gov (United States)

    2007-03-01

    654.3.1 Transformed Data Results . . . . . . . . . . . . 664.3.2 Untransformed Data Results . . . . . . . . . . . 704.4 Application of ...the needed repower to destroy surface based enemy targets.Courtesy of Boeing Corporation. http://www.boeing.com/news/ fea-ture/aa2004/backgrounders...medium is cornerstone to successful employ-ment of these HELs. 1.3 Introduction to Optical Turbulence Lethal application of directed energy repower

  5. Solar fired combined RO/MED desalination plant integrated with electrical power grid

    International Nuclear Information System (INIS)

    Alrobaei, H.

    2006-01-01

    Currently, there is a strong demand for efficient seawater desalination plants, which can meet the tougher environment regulation and energy saving requirements. From this standpoint the present work was undertaken to include proposed scheme (solar Fired Combined Reverse Osmosis (ROY Multi-Effect Distillation (MED) Seawater desalination Plant (SCDP) integrated with electrical power grid (EPG)) for repowering and modification of the conventional grid connected RO desalination plants. The model of SCDP during sunny periods may be applied to the following modes operation: *Full solar desalination (i.e. solar thermal and electrical power generation in solar plant is elivered to the desalination process and the surplus electricity is fed into EPG). *Hybrid solar desalination (I.e. a small share of the electrical power consumption for desalination process compensated by EPG). During cloudly periods and at night the SCDP operates as a conventional RO desalination plant. To establish the range, in which solar energy for seawater desalination would be competitive to fossil energy and investigates the potential effect of the proposed scheme on the repowering effectiveness, mathematical model has been developed. The repowered effectiveness, mathematical model has been developed.The repowered effectiveness in optaimizing model was characterized by the condition of attaining maximum fuel saving in the EPG. The study result shows the effectiveness of proposed scheme for modification and repowering the RO plant. For the case study. (SCDP with maual share of solar electrical power generation 67.4%) the economical effect amount 138.9 ton fuel/year for each MW design thermal energy of parabolic solar collectors array and the corresponding decrease in exhaust gases emission (Nitrogen oxides (NO x ) 0.55 ton/year.MW, carbon dioxides (CO2) 434.9 ton/year.MW). Moreover, implementation of combined RO/MED design for repowering and modification of conventional grid connected RO plant will

  6. We Were Caught Unprepared: The 2006 Hezbollah-Israeli War

    Science.gov (United States)

    2008-01-01

    and would conduct the majority of its operations using standoff-based fi repower . Available historic evidence appears to indicate this rationale was...south of the Litani. The supplies were secreted in well-fortifi ed bunkers and entrenchments designed to withstand blistering IDF-precision fi repower ...Hezbollah to modify its doctrine. By the early summer of 2006, Hezbollah had transformed its original 13 22 principles of warfare (a doctrine that had

  7. The Spectrum of Warfare Challenge. Joint Center for Operational Analysis Journal, Volume 11, Issue 2, Spring 2009

    Science.gov (United States)

    2009-01-01

    Commander United States Joint Forces Command (USJFCOM), stated that the US military must transform to a hybrid force capable of both conventional and...RPGs, the 11th IA division did not (initially) have the confi dence to match the fi repower of JAM/ SGC elements, which consisted of EFPs, snipers, mor...soldiers decided to “take charge” of events with their overwhelming fi repower assets. Likewise, any excessive use of force involving CF troops with

  8. Repowering hydro

    International Nuclear Information System (INIS)

    Lagassa, G.

    1992-01-01

    This article examines the current market for equipment and services to retrofit existing hydroelectric plants with modern equipment and evaluating, upgrading, or rehabilitating dams. The topics of the article include the current markets, the consulting engineer's role, the impetus for the market, and the future of the market for site upgrading and equipment refurbishing

  9. Comprehensive report to Congress Clean Coal Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-01

    This project will demonstrate Integrated Gasification Combined Cycle (IGCC) technology in a commercial application by the repowering of an existing City Water, Light and Power (CWL P) Plant in Springfield, Illinois. The project duration will be 126 months, including a 63-month demonstration period. The estimated cost of the project is $270,700,000 of which $129,357,204 will be funded by DOE. The IGCC system will consist of CE's air-blown, entrained-flow, two-stage, pressurized coal gasifier; an advanced hot gas cleanup process; a combustion turbine modified to use low Btu coal gas; and all necessary coal handling equipment. An existing 25-MWe steam turbine and associated equipment will also be part of the IGCC system. The result of repowering will be an IGCC power plant with low environmental emissions and high net plant efficiency. The repowering will increase plant output by 40 MWe through addition of the combustion turbine, thus providing a total IGCC capacity of a nominal 65 MWe. 3 figs., 2 tabs.

  10. Naval Station Newport Wind Resource Assessment. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites, and The Naval Facilities Engineering Service Center

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, R.; Fields, J.; Roberts, J. O.

    2012-02-01

    The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy (RE) on potentially contaminated land and mine sites. EPA is collaborating with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate RE options at Naval Station (NAVSTA) Newport in Newport, Rhode Island where multiple contaminated areas pose a threat to human health and the environment. Designated a superfund site on the National Priorities List in 1989, the base is committed to working toward reducing the its dependency on fossil fuels, decreasing its carbon footprint, and implementing RE projects where feasible. The Naval Facilities Engineering Service Center (NFESC) partnered with NREL in February 2009 to investigate the potential for wind energy generation at a number of Naval and Marine bases on the East Coast. NAVSTA Newport was one of several bases chosen for a detailed, site-specific wind resource investigation. NAVSTA Newport, in conjunction with NREL and NFESC, has been actively engaged in assessing the wind resource through several ongoing efforts. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and a survey of potential wind turbine options based upon the site-specific wind resource.

  11. Ciclo combinado Diesel-Vapor como repotenciación de una central termoeléctrica: caso de estudio; Combined Cycle Diesel-Steam as Power Plant Repowering: study case

    Directory of Open Access Journals (Sweden)

    Alberto Eduardo Calvo González

    2015-04-01

    Full Text Available La necesidad imperiosa de cubrir el déficit de generación eléctrica ampliando el potencial de generación con motores diesel a fuel oíl, cuya instalación requiere de muy poco tiempo, es una solución adecuada. La idea de aprovechar los nodos del sistema electro energético, como son las subestaciones y las centrales eléctricas, para instalar los grupos electrógenos es una solución apropiada. Pero en el caso de una central termoeléctrica, al montar estas instalaciones de forma independiente, no se aprovechan las posibilidades que la combinación de procesos ofrece como la disminución del consumo de combustible, y de la contaminación ambiental por unidad de energía producida. El presente trabajo explora la posibilidad de instalar plantas eléctricas diesel a fuel oil como ciclo combinado diesel-vapor. Se demuestra la conveniencia de instalar plantas eléctricas diesel a fuel oil como ciclo combinado diesel-vapor, aprovechando la sinergia que se logra por la combinación de los procesos térmicos.  The pressing need of covering generation deficit to satisfy the demand in the shorter possible time, by enlarging the generation potential with fuel oil fueled diesel motors, it’s an appropriate solution. The idea of taking advantage of electric grid existent nodes facilities to place the generating electricity diesel motors is a non-unwise solution. But in the case of the node of steam power station place these motors in an independent way, don't take advantage of the possibilities that the processes combination offers, as the combined cycle diesel vapor for example. The work presented herein explored and showed the possibility of installing the electric diesel plants as a repowering the existing steam power plant by combined cycle diesel-steam taking advantage of the synergy achieved by thermal processes combination.

  12. Ciclo combinado Diesel-Vapor como repotenciación de una central termoeléctrica: caso de estudio; Combined Cycle Diesel-Steam as Power Plant Repowering: study case

    Directory of Open Access Journals (Sweden)

    Alberto Eduardo Calvo González

    2014-06-01

    Full Text Available La necesidad imperiosa de cubrir el déficit de generación eléctrica ampliando el potencial de generación con motores diesel a fuel oíl, cuya instalación requiere de muy poco tiempo, es una solución adecuada. La idea de aprovechar los nodos del sistema electro energético, como son las subestaciones y las centrales eléctricas, para instalar los grupos electrógenos es una solución apropiada. Pero en el caso de una central termoeléctrica, al montar estas instalaciones de forma independiente, no se aprovechan las posibilidades que la combinación de procesos ofrece como la disminución del consumo de combustible, y de la contaminación ambiental por unidad de energía producida. El presente trabajo explora la posibilidad de instalar plantas eléctricas diesel a fuel oil como ciclo combinado diesel-vapor. Se demuestra la conveniencia de instalar plantas eléctricas diesel a fuel oil como ciclo combinado diesel-vapor, aprovechando la sinergia que se logra por la combinación de los procesos térmicos. The pressing need of covering generation deficit to satisfy the demand in the shorter possible time, by enlarging the generation potential with fuel oil fueled diesel motors, it’s an appropriate solution. The idea of taking advantage of electric grid existent nodes facilities to place the generating electricity diesel motors is a non-unwise solution. But in the case of the node of steam power station place these motors in an independent way, don't take advantage of the possibilities that the processes combination offers, as the combined cycle diesel vapor for example. The work presented herein explored and showed the possibility of installing the electric diesel plants as a repowering the existing steam power plant by combined cycle diesel-steam taking advantage of the synergy achieved by thermal processes combination.

  13. Batteryless, wireless sensor powered by a sediment microbial fuel cell.

    Science.gov (United States)

    Donovan, Conrad; Dewan, Alim; Heo, Deukhyoun; Beyenal, Haluk

    2008-11-15

    Sediment microbial fuel cells (SMFCs) are considered to be an alternative renewable power source for remote monitoring. There are two main challenges to using SMFCs as power sources: 1) a SMFC produces a low potential at which most sensor electronics do not operate, and 2) a SMFC cannot provide continuous power, so energy from the SMFC must be stored and then used to repower sensor electronics intermittently. In this study, we developed a SMFC and a power management system (PMS) to power a batteryless, wireless sensor. A SMFC operating with a microbial anode and cathode, located in the Palouse River, Pullman, Washington, U.S.A., was used to demonstrate the utility of the developed system. The designed PMS stored microbial energy and then started powering the wireless sensor when the SMFC potential reached 320 mV. It continued powering until the SMFC potential dropped below 52 mV. The system was repowered when the SMFC potential increased to 320 mV, and this repowering continued as long as microbial reactions continued. We demonstrated that a microbial fuel cell with a microbial anode and cathode can be used as an effective renewable power source for remote monitoring using custom-designed electronics.

  14. Sites Pre-Screened for Biomass and Biofuel Potential

    Data.gov (United States)

    U.S. Environmental Protection Agency — The RE-Powering Screening Dataset spreadsheet contains detailed site information on over 80,000 contaminated lands, landfills, and mine sites with screening results...

  15. Sites Pre-Screened for Wind Energy

    Data.gov (United States)

    U.S. Environmental Protection Agency — The RE-Powering Screening Dataset spreadsheet contains detailed site information on over 80,000 contaminated lands, landfills, and mine sites with screening results...

  16. Sites Pre-Screened for Geothermal Energy Potential

    Data.gov (United States)

    U.S. Environmental Protection Agency — The RE-Powering Screening Dataset spreadsheet contains detailed site information on over 80,000 contaminated lands, landfills, and mine sites with screening results...

  17. Sites Pre-Screened for Solar Energy

    Data.gov (United States)

    U.S. Environmental Protection Agency — The RE-Powering Screening Dataset spreadsheet contains detailed site information on over 80,000 contaminated lands, landfills, and mine sites with screening results...

  18. A Mulit-State Model for Catalyzing the Home Energy Efficiency Market

    Energy Technology Data Exchange (ETDEWEB)

    Blackmon, Glenn

    2014-03-25

    The RePower Kitsap partnership sought to jump-start the market for energy efficiency upgrades in Kitsap County, an underserved market on Puget Sound in Washington State. The Washington State Department of Commerce partnered with Washington State University (WSU) Energy Program to supplement and extend existing utility incentives offered by Puget Sound Energy (PSE) and Cascade Natural Gas and to offer energy efficiency finance options through the Kitsap Credit Union and Puget Sound Cooperative Credit Union (PSCCU). RePower Kitsap established a coordinated approach with a second Better Buildings Neighborhood Program project serving the two largest cities in the county – Bainbridge Island and Bremerton. These two projects shared both the “RePower” brand and implementation team (Conservation Services Group (CSG) and Earth Advantage).

  19. Renewable Energy Potential for New Mexico

    Science.gov (United States)

    RE-Powering America's Land: Renewable Energy on Contaminated Land and Mining Sites was presented by Penelope McDaniel, during the 2008 Brown to Green: Make the Connection to Renewable Energy workshop.

  20. Valuing natural gas power generation assets in the new competitive marketplace

    Science.gov (United States)

    Hsu, Michael Chun-Wei

    1999-10-01

    The profitability of natural gas fired power plants depends critically on the spread between electricity and natural gas prices. The price levels of these two energy commodities are the key uncertain variables in determining the operating margin and therefore the value of a power plant. The owner of a generation unit has the decision of dispatching the plant only when profit margins are positive. This operating flexibility is a real option with real value. In this dissertation I introduce the spark spread call options and illustrate how such paper contracts replicate the uncertain payoff space facing power asset owners and, therefore, how the financial options framework can be applied in estimating the value of natural gas generation plants. The intrinsic value of gas power plants is approximated as the sum of a series of spark spread call options with succeeding maturity dates. The Black-Scholes spread option pricing model, with volatility and correlation term structure adjustments, is utilized to price the spark spread options. Sensitivity analysis is also performed on the BS spread option formulation to compare different asset types. In addition I explore the potential of using compound and compound-exchange option concepts to evaluate, respectively, the benefits of delaying investment in new generation and in repowering existing antiquated units. The compound option designates an option on top of another option. In this case the series of spark spread call options is the 'underlying' option while the option to delay new investments is the 'overlying.' The compound-exchange option characterizes the opportunity to 'exchange' the old power plant, with its series of spark spread call options, for a set of new spark spread call options that comes with the new generation unit. The strike price of the compound-exchange option is the repowering capital investment and typically includes the purchase of new steam generators and combustion turbines, as well as other

  1. The modernization potential of gas turbines in the coal-fired power industry thermal and economic effectiveness

    CERN Document Server

    Bartnik, Ryszard

    2013-01-01

    The opportunity of repowering the existing condensing power stations by means of  gas turbogenerators offers an important opportunity to considerably improvement of their energy efficiency. The Modernization Potential of Gas turbines in the Coal-Fired Power Industry presents the methodology, calculation procedures and tools used to support enterprise planning for adapting power stations to dual-fuel gas-steam combined-cycle technologies. Both the conceptual and practical aspects of the conversion of existing coal-fired power plants is covered. Discussions of the feasibility, advantages and disadvantages and possible methods are supported by chapters presenting equations of energy efficiency for the conditions of repowering a power unit by installing a gas turbogenerator in a parallel system and the results of technical calculations involving the selection heating structures of heat recovery steam generators. A methodology for analyzing thermodynamic and economic effectiveness for the selection of a structure...

  2. Multiple account benefit-cost evaluation of the Burrard Thermal Generating Plant

    International Nuclear Information System (INIS)

    2001-04-01

    The government of British Columbia commissioned a multiple account benefit-cost analysis of the Burrard Thermal Generating Plant to ensure that the power production is in the economic and environmental interest of the province. The power plant consists of 6 natural gas-fired generating units with a combined capacity of 950 MW. It has been updated in recent years to reduce local emissions and to increase plant availability and reliability. Burrard has contributed in a major way to BC Hydro's net revenues, but there have been concerns that BC Hydro's purchases of natural gas for the power plant have contributed to the sharp increases in natural gas prices in 2001. There have also been concerns about air emissions from Burrard, including greenhouse gases and nitrous oxides. Historically, the plant has been beneficial, but this report will determine if it is in the provincial interest to continue operation of Burrard or to turn to alternative scenarios. The alternatives include constraining Burrard's output, or shutting it down and replacing it with other resources and repowering the plant with more efficient combined cycle gas turbine technology. In the constrained scenario, Burrard output and net exports are reduced. In the repowering scenario, investment and output at Burrard is increased. The financial consequences of these impacts are measured by their effect on the net system costs of meeting BC Hydro's load. The report demonstrated that it would not be in the overall interest of the province to constrain the operation of Burrard or shut it down. It was recommended that BC Hydro should review in detail the repowering option for Burrard, and that the government should consider imposing an emission charge reflecting the estimated damage costs associated with local pollutants generated at Burrard. The revenues would be used to fund offset measures in the Lower Fraser Valley airshed. 29 refs., 29 tabs., 3 appendices

  3. Wind energy utilisation. 7. enl. and compl. rev. ed.; Nutzung der Windenergie

    Energy Technology Data Exchange (ETDEWEB)

    Heier, Siegfried [Kassel Univ. (Germany)

    2016-07-01

    The use of wind energy register furthermore rapid technological advances. Intensive research efforts in scientific institutions and in industry have led to it that the plants are reliable high technology products today. An overview of these developments give the completely revised BINE reference-book. The focus is on technologies, concepts and the market development of the wind industry. Other topics include network integration, economy and current research perspectives as well as environmental balance and repowering. Planners, investors and students get an overview of the status and development of the technology, the economy and the legal framework. [German] Die Nutzung der Windenergie verzeichnet weiterhin rasante technologische Fortschritte. Intensive Forschungsanstrengungen an wissenschaftlichen Institutionen und in der Industrie haben dazu gefuehrt, dass die Anlagen heute zuverlaessige Hightech Produkte sind. Einen Ueberblick ueber diese Entwicklungen gibt das vollstaendig ueberarbeitete BINE-Fachbuch. Im Mittelpunkt stehen Technologien, Konzepte und die Marktentwicklung der Windbranche. Weitere Themen sind die Netzintegration, Wirtschaftlichkeit und aktuelle Forschungsperspektiven sowie Umweltbilanz und Repowering. Planer, Investoren und Studierende erhalten einen Ueberblick ueber Stand und Entwicklung der Technik, die Wirtschaftlichkeit sowie die rechtlichen Rahmenbedingungen.

  4. A unified approach to assess performance of different techniques for recovering exhaust heat from gas turbines

    International Nuclear Information System (INIS)

    Carapellucci, Roberto

    2009-01-01

    Exhaust heat from gas turbines can be recovered externally or internally to the cycle itself. Of the technology options for external recovery, the combined gas-steam power plant is by far the most effective and commonly used worldwide. For internal recovery conventional solutions are based on thermodynamic regeneration and steam injection, while innovative solutions rely on humid air regeneration and steam reforming of fuel. In this paper a unified approach for analysing different exhaust heat recovery techniques is proposed. It has been possible to define a characteristic internal heat recovery plane, based on a few meaningful parameters and to identify an innovative scheme for repowering existing combined cycles. The characteristic plane indicates directly the performance obtainable with the different recovery techniques, showing that performances close to combined cycle plants (external recovery) can only be achieved with combined recovery techniques (humid air regeneration, steam reforming of fuel). The innovative repowering scheme, which requires the addition of a gas turbine and one-pressure level HRSG to an existing combined gas-steam power plant, significantly increases power output with fairly high marginal efficiency.

  5. EPA RE-Powering Mapper Region 7

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  6. EPA RE-Powering Mapper Large Scale

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  7. EPA RE-Powering Mapper Region 6

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  8. EPA RE-Powering Mapper Region 8

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  9. EPA RE-Powering Mapper Region 5

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  10. EPA RE-Powering Mapper Region 3

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  11. 75 FR 11841 - Repowering Assistance Program

    Science.gov (United States)

    2010-03-12

    ..., and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's...

  12. EPA RE-Powering Mapper Feasibility Studies

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  13. EPA RE-Powering Mapper Completed Installations

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  14. EPA RE-Powering Mapper Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  15. EPA RE-Powering Mapper Region 10

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  16. EPA RE-Powering Mapper Region 4

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  17. EPA RE-Powering Mapper Utility Scale

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  18. EPA RE-Powering Mapper Region 2

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  19. EPA RE-Powering Mapper Region 1

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  20. Nuclear power in the US; Atomkraft in den USA

    Energy Technology Data Exchange (ETDEWEB)

    Judson, Tim [Nuclear Information and Resource Service (NIRS), Takoma Park, MD (United States)

    2018-01-15

    The Trump government promotes the further operation of aging nuclear power plants in the US by governmental support although several operators close their nuclear power plants due to economic reasons. The Trump government is also repowering the Yucca-Mountain-Project for radioactive waste disposal that was stopped by the Obama government based on geological problems in the region.

  1. Nuclear power in the US

    International Nuclear Information System (INIS)

    Judson, Tim

    2018-01-01

    The Trump government promotes the further operation of aging nuclear power plants in the US by governmental support although several operators close their nuclear power plants due to economic reasons. The Trump government is also repowering the Yucca-Mountain-Project for radioactive waste disposal that was stopped by the Obama government based on geological problems in the region.

  2. Flexible dynamic operation of solar-integrated power plant with solvent based post-combustion carbon capture (PCC) process

    International Nuclear Information System (INIS)

    Qadir, Abdul; Sharma, Manish; Parvareh, Forough; Khalilpour, Rajab; Abbas, Ali

    2015-01-01

    Highlights: • Flexible operation of power and PCC plant may significantly increase operational revenue. • Higher optimal carbon capture rates observed with solar thermal energy input. • Solar thermal repowering of the power plant provides highest net revenue. • Constant optimal capture rate observed for one of the flexible operation cases. • Up to 42% higher revenue generation observed between two cases with solar input. - Abstract: This paper examines flexible operation of solvent-based post-combustion carbon capture (PCC) for the reduction of power plant carbon emissions while minimizing revenue loss due to the reduced power plant electricity output. The study is conducted using a model superstructure enveloping three plants; a power plant, a PCC plant and a solar thermal field where the power plant and PCC plant are operated flexibly under the influence of hourly electricity market and weather conditions. Reduced (surrogate) models for the reboiler duty and auxiliary power requirement for the carbon capture plant are generated and applied to simulate and compare four cases, (A) power plant with PCC, (B) power plant with solar assisted PCC, (C) power plant with PCC and solar repowering – variable net electricity output and (D) power plant with PCC and solar repowering – fixed net electricity output. Such analyses are conducted under dynamic conditions including power plant part-load operation while varying the capture rate to optimize the revenue of the power plant. Each case was simulated with a lower carbon price of $25/tonne-CO 2 and a higher price of $50/tonne-CO 2 . The comparison of cases B–D found that optimal revenue generation for case C can be up to 42% higher than that of solar-assisted PCC (case B). Case C is found to be the most profitable with the lowest carbon emissions intensity and is found to exhibit a constant capture rate for both carbon prices. The optimal revenue for case D is slightly lower than case C for the lower carbon

  3. Phase Equilibria and Transition in Mixtures of a Homopolymer and a Block Copolymer. I. Small-Angle X-Ray Scattering Study.

    Science.gov (United States)

    1983-03-08

    tlh repow ) !Unclassified lie. DECLASSI FICATION/ DOWNGRADING SCHEDULE 16. DISTRIBUTION STATEMENT ( of this Report) Distribution Unlimited, Approved for...a block copolymer can sometimes be transformed into a homogeneous, disordered structure. The tem- perature of the transition depends on the degree of ...probably that the morphology is gradually transformed from spherical to cylindrical and eventually to lamellar packing. There is, however, no evidence of

  4. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-30

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project is expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality

  5. CCITT (International Telegraph Consultative Committee) Study Groups XI and XVIII Draft Recommendations for ISDN (Integrated Services Digital Networks), November 8-December 2, 1983.

    Science.gov (United States)

    1983-12-01

    dc balancing bit in the frame structure; needed because coupling transformers cannot pass dc. LT-- line termination, at the switch end of the... of its TEI when it is powered (or repowered ) up and/or after it detects the reappearance of input framing signals (assuming its prior detection of the...DECMBE ,-..83 UNCLASSIFIED % SECURITY CLASSIFICATION OF THIS PAGE (When Date Ent,~ ed)__________________ REPOT DOUMENAT& AGEREAD INSTRUCTIONSREPOR

  6. Progress in Military Airlift (Les Progres Realises dans le Domaine du Transport Aerien Militaire)

    Science.gov (United States)

    1991-05-01

    transformation of the flight deck, with both visible and concealed changes. This crew/ airplane interface modification has resulted in an evolution of ...300 ADVISORY GROUP FOR AEROSPACE RESEARCH & DEVELOPMENT 7 RUE ANCELLE 92200 NEUILLY SUR SEINE FRANCE AGARD ADVISORY REPOW 300 Technical Evaluation...Advisory Report was prepared at the request of the ’ Flight Mechanics Panel of AGARD. _ North Atlantic Treaty Organization Organisation du Trait de

  7. EPA RE-Powering Mapper Solar on Landfills

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  8. HTR-PM Progress and Further Commercial Deployment

    International Nuclear Information System (INIS)

    Wu, Frank

    2017-01-01

    Project Milestones: • 2004: industry investment agreement was signed • 2006: decided to use 2×250 MWt reactor modules with a 200 MWe steam turbine, became a key government R&D project • 2008: ATP was issued • 2012.12.9: FCD the first concrete poured. Chinese HTR development: HTR Roles in China - Power generation: supplement to LWR; repowering coal fired plants - Co-generation to supply steam - Hydrogen production

  9. A Systems Analysis and Project Management Plan for the Petite Amateur Navy Satellite (PANSAT)

    Science.gov (United States)

    1994-09-01

    engineering is defined as a process by which a stated need (objective) is transformed into a life cycle balanced set of product and process descriptions...and rr.eseing the collection of informialtio Send comments regardmg this burden estimate or any o•her aspect of this :olleiori•t i informationt...including suggeston, for reducing this bourden, to Washington Hieadquaroers .ervin Directorate I’r Infomiation Operalions% and Repows 1211 Jefferson Paws

  10. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Directory of Open Access Journals (Sweden)

    Tańczuk Mariusz

    2017-01-01

    Full Text Available District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  11. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Science.gov (United States)

    Tańczuk, Mariusz; Radziewicz, Wojciech; Olszewski, Eligiusz; Skorek, Janusz

    2017-10-01

    District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value) has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  12. Entering the Canadian mainstream

    International Nuclear Information System (INIS)

    Salaff, S.

    1992-01-01

    This article examines the developing market for independent power projects in Canada. The topics of the article include bidding in Ontario, the Quebec market, powering British Columbia, and market forces at work in Canada. Discussed are current projects in all stages of completion from bidding to production and includes gas-fired cogeneration, gas-fired combined-cycle electricity generation and cogeneration, wood-waste fired plants, repowering of existing utility plants, and hydroelectric power plants

  13. An Investigation of the Crystalchemistry and Thermochemistry of Selected Mineral Systems.

    Science.gov (United States)

    1987-10-29

    PURPOSES AD-A 189 7581OCUMENTATION PAGE Is. REPOW Mb. RESTRICTIVE MARINGS iJf FL ui 3.DITRIDUTION /AVAILABIUTY OF REPOR 2b. DECLASSIFICATIONIOOWNGRAOiNG...Continuous Observation of Phase Transformations ", Journal of Metals Abstract April 1986. 5. Reeber, R.R. and Tesche, B. (1987) "Synchrotron...RD-AIlS ?59 AN INYESTIGATION OF THE CRYSTALCHENISTRY AND THERMNOCENISTRY OF SELECTED..(U) NORTH CAROLINA UNIV AT CHAPEL HILL DEPT OF GEOLOGY R R

  14. Joint Center for Operational Analysis Journal. Volume 10, Issue 1, December 2007

    Science.gov (United States)

    2007-12-01

    area of responsibility to support the four star commanders. The next step for JCOA and the command is to transform our fi ndings into actionable...synchronize its fi repower for a coordinated attack. In the early morning of 13 August, the IDF soldiers succeeded in pushing through the Hezbollah...Pandemic Flu —Are We Ready? Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is

  15. Cruise Report: DOLCE VITA 1 and 2, 31 January-24 February and 26 May-15 June, 2003

    Science.gov (United States)

    2005-02-01

    kHz broadband ADCP consisted of transformation to earth coordinates of individual pings followed by one-minute bin averaging of the transformed pings... Transformations were performed using data from the shipboard Ashtech ADU-2, ship’s gyro, and heading from the ship’s GPS VTG string (in order of ...for any sort of lag effect). During the cruise we explored several solutions, including repowering the pums on their own 12V power supply, running

  16. Design, Development, and Demonstration of a Prognostic and Diagnostics Health Monitoring System for the CROWS Platform

    Science.gov (United States)

    2010-06-01

    Acquisition Test Results Frequency responses of the data for both systems were compared using an averaged Fourier Transform of the raw data. The data were...individual Fourier Transforms were applied to 80 randomly selected data blocks, each containing 512 data points. The magnitudes of the Fourier Transform ...external surface of the cavity for communications back to the PDSM. A power on reset was installed on the outside of the cavity to repower the PDSM

  17. Damage Tolerant Repair Techniques for Pressurized Aircraft Fuselages

    Science.gov (United States)

    1994-01-01

    RepoW Techniques for Prwurized Aircraft AXWdOg 4.9 Summary and Conclusions The basics of adhesive bonded repairs for aluminum aircraft fuselages have... of cruise altitude and bending stresses in the plate at the tip of one-sided reinforcements (chapter 5). The expanded Rose model was transformed into a...DEPARTMEN1 OF THE AIR FORCE AGENCY REPORT NUMBER AFIT/CI 2950 P STREET WRIGHT-PATTERSON AFB OH 45433-7765 11. SUPPLEMENTARY NOTES Usa. DISTRUISUIOII

  18. Wind energy use in Germany. Status 31.12.2012; Windenergienutzung in Deutschland. Stand 31.12.2012

    Energy Technology Data Exchange (ETDEWEB)

    Ender, C. [DEWI GmbH, Wilhelmshaven (Germany)

    2013-02-15

    2012 has been a good year for the development of wind energy world-wide and also for Germany. All in all, the global installed wind power capacity in 2012 was 44,712 MW, which is an increase of 8.4 % compared to last year's figures (Tab. 1). Of the new installations, about 59 per cent were realized in China (13.2 GW) and the USA (13.1 GW), followed by Germany and India. It is interesting to note that for the first time Romania has made it among the TOP 10 countries in 2012. With 923 MW new installed capacity the country achieved the tenth position. [1] The positive market development for Germany was already foreseeable when evaluating the figures for the first six months of 2012, and it was confirmed at the end of the year. Based on the average share of the first half year in the annual result over the last five years, new installations of up to 2,350 MW could be expected. The final installation figures of 2,440 MW even exceeded the forecast. This result is the fourth best in the history of the DEWI-Statistics, only beaten by the installations of the record years 2001 to 2003. The good result is probably partly due to projects promoted because of the Energiewende, but also to repowering projects which are contributing an increasing share in the wind energy development. Older wind turbines from the 1990s have now reached an age where replacement may be considered. This applies especially to turbines that were erected after 1998 and are located in wind priority areas. In concrete figures, according to information supplied by wind turbine manufacturers1 altogether 1,003 new wind turbines (WTGS) with 2,439.66 megawatt (MW) were installed in Germany in 2012 (Fig. 1). This means an increase of 21.5 % compared to the year before. As already mentioned, repowering projects have made a significant contribution to the development. Their share in the new installations is approx. 22 %, plus the use of repowering bonus certificates for 117 dismantled wind turbines. Apart

  19. American power conference 2001 proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    Sessions included: distributed generation - trends and technologies; combustion modifications for NOx control; post combustion NOx control; repowering for the future; issues in development of new generation; taking a closer look at operation and maintenance; SCADA technology; customer/demand side management enters the trading area; managing feeder dynamics; keeping the lights on - power quality and reliability; merchant plant grid interconnection; optimising generation assets; power price spikes; e-commerce - from soup to nuts; and power generation market trends.

  20. How wind power landscapes change

    DEFF Research Database (Denmark)

    Möller, Bernd

    2006-01-01

    Following 25 years of continuous development, Danish wind energy landscapes are going to face changes. Ceased on-shore construction, unresolved re-powering and stalled regional planning characterize the situation overshadowed by off-shore development. One of the factors inhibiting development...... in general. However, the pattern of visibility will become askew, and the present homogenous distribution of visibility will disappear. This skewness, together with changing ownership and receding local involvement, could eventually lead to lower popular acceptance of wind power....

  1. Sustainable development with clean coal

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    This paper discusses the opportunities available with clean coal technologies. Applications include new power plants, retrofitting and repowering of existing power plants, steelmaking, cement making, paper manufacturing, cogeneration facilities, and district heating plants. An appendix describes the clean coal technologies. These include coal preparation (physical cleaning, low-rank upgrading, bituminous coal preparation); combustion technologies (fluidized-bed combustion and NOx control); post-combustion cleaning (particulate control, sulfur dioxide control, nitrogen oxide control); and conversion with the integrated gasification combined cycle.

  2. Potential contribution of the Clean Coal Program to reducing global emissions of greenhouse gases

    International Nuclear Information System (INIS)

    Blasing, T.J.

    1992-01-01

    Environmental considerations of Clean Coal Program (CCP) initially focused on reducing emissions of sulfur dioxide (SO 2 ) and nitrogen oxides (NO x ) to the atmosphere. However, it has also become apparent that some Clean Coal Technologies (CCTs) may contribute appreciably to reducing emissions of carbon dioxide (CO 2 ), thereby diminishing the rate of any global warming that may result from greenhouse effects. This is particularly true for CCTs involving replacement of a major portion of an existing facility and/or providing the option of using a different fuel form (the repowering CCTs). Because the subject of global-scale climate warming is receiving increased attention, the effect of CCTs on Co 2 emissions has become a topic of increasing interest. The Final Programmatic Environmental Impact Statement for the Clean Coal Technology Demonstration Program projected that with full implementation of those repowering CCTs that would be most effective at reducing CO 2 emissions (Pressurized Fluidized Bed and Coal Gasification Fuel Cell technologies), the national fossil-fuel Co 2 emissions by the year 2010 would be roughly 90% of the emissions that would occur with no implementation of any CCTs by the same date. It is the purpose of this paper to examine the global effect of such a reduction in greenhouse gas emissions, and to compare that effect with effects of other strategies for reducing global greenhouse gas emissions

  3. 40 CFR 73.21 - Phase II repowering allowances.

    Science.gov (United States)

    2010-07-01

    ... in the following table Unit Year 2000 adjusted basic allowances RE Burger 1 1273 RE Burger 2 1245 RE... manner: EC01SE92.082 where: Forfeiture Period = difference (as a portion of a year) between the end of... table in paragraph (a) of this section. (c)(2) The Administrator will reallocate any allowances...

  4. A Review of Some Aspects of Robust Inference for Time Series.

    Science.gov (United States)

    1984-09-01

    REVIEW OF SOME ASPECTSOF ROBUST INFERNCE FOR TIME SERIES by Ad . Dougla Main TE "iAL REPOW No. 63 Septermber 1984 Department of Statistics University of ...clear. One cannot hope to have a good method for dealing with outliers in time series by using only an instantaneous nonlinear transformation of the data...AI.49 716 A REVIEWd OF SOME ASPECTS OF ROBUST INFERENCE FOR TIME 1/1 SERIES(U) WASHINGTON UNIV SEATTLE DEPT OF STATISTICS R D MARTIN SEP 84 TR-53

  5. Circulating fluidized-bed technology - toward zero CO{sub 2} emissions

    Energy Technology Data Exchange (ETDEWEB)

    Timo Jaentti; Timo Eriksson; Arto Hotta; Timo Hyppaenen; Kalle Nuortimo [Foster Wheeler Energia Oy, Varkaus (Finland)

    2006-07-01

    This paper presents the existing status of CFB technology in respect of boiler efficiency and fuel flexibility. Examples of the high efficiency repowering CFB projects both with sub and supercritical steam parameters from Estonia (Narva) and Poland (Turow and Lagisza) are presented. The paper also describes experiences from one utility CFB project in Thailand (NPS) with high biofuel and coal cocombustion capability. The main advantages of the CFB technology for oxycombustion and a development plan for the Oxy CFB is presented. 11 refs., 11 figs., 3 tabs.

  6. Tri-generation in urban networks; Trigeneration en reseau urbain

    Energy Technology Data Exchange (ETDEWEB)

    Malahieude, J.M. [Trigen Energy Corp., New-York (United States)

    1996-12-31

    The concepts of tri-generation (simultaneous production of heat, electric power and refrigerating energy) and thermal energy distribution networks, are presented. The different components of the tri-generation system from Trigen Energy Corp. are ammonia as a refrigerant for the production of cooled water, screw compressors, gas turbines and an induction motor-generator in order to optimize the combined gas turbine and compressor utilization. The energy efficiency and pollution reduction of the system are evaluated; the system has been enhanced through re-powering and post combustion

  7. Development of a Temperature Controller for a Vuilleumier (VM) Cycle Power Cylinder

    Science.gov (United States)

    1975-10-01

    the system in the event of a shorted sensor; both of these actions turn the power section of the controller "off," and it cannot be repowered until...400-Hz power to a low-level DC with the attendant necessity of using a 400-Hz power transformer . Thus use of DC will allow a less compli- cated...N AFFDL.TR-75-99 7? ^0 00 o o o CQ DEVELOPMENT OF A TEMPERATURE CONTROLLER FOR A VUILLEUMIER (VM) CYCLE POWER CYLINDER i ■ L RTHUR D

  8. The Effect of Rician Fading and Partial-Band Interference on Noise- Normalized Fast Frequency-Hopped MFSK Receivers

    Science.gov (United States)

    1994-03-01

    FSK 16. PmCI coot 17. SECURITY CLASSWsAI1OW IL SICUURW CLA$SIICATION SECURITY CLASSIICATION 20. LIMIATION Of ABSTRACT CW REPOW ? OF TiNS PAU OF ...hop k of a symbol when partial-band interference is present is obtained from (11) and the linear transformation of random variables given by (3) as...from (13) and the transformation of random variables indicated by (9) as [16] fzwjm(zwik) = f cTak!X. (Xmk, = ZmkOkI17) f~(0,kdo . -- (,.U(zk’ )fE2

  9. 77 FR 2472 - Great Lakes Steamship Repower Incentive Program

    Science.gov (United States)

    2012-01-18

    ... Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not... Rules'' section of today's Federal Register, we are publishing a separate document that will serve as... allow the use of residual fuel in the replacement diesel engines that exceeds the global and ECA sulfur...

  10. 77 FR 2497 - Great Lakes Steamship Repower Incentive Program

    Science.gov (United States)

    2012-01-18

    ... allow the use of residual fuel in the replacement diesel engines that exceeds the global and ECA sulfur... changes, see the direct final rule EPA has published in the ``Rules and Regulations'' section of today's... substantial number of small entities. Small entities include small businesses, small organizations, and small...

  11. 76 FR 7915 - Repowering Assistance Payments to Eligible Biorefineries

    Science.gov (United States)

    2011-02-11

    ... health or safety, or State, local, or Tribal governments or communities; (2) Create a serious... Middle East, China, Malaysia). In addition, as technology deployment costs are lower overseas, foreign...

  12. Can open-source drug R&D repower pharmaceutical innovation?

    Science.gov (United States)

    Munos, B

    2010-05-01

    Open-source R&D initiatives are multiplying across biomedical research. Some of them-such as public-private partnerships-have achieved notable success in bringing new drugs to market economically, whereas others reflect the pharmaceutical industry's efforts to retool its R&D model. Is open innovation the answer to the innovation crisis? This Commentary argues that although it may likely be part of the solution, significant cultural, scientific, and regulatory barriers can prevent it from delivering on its promise.

  13. 75 FR 20073 - Repowering Assistance Payments to Eligible Biorefineries

    Science.gov (United States)

    2010-04-16

    ... site analysis per each application to the program. Site- specific NEPA documents prepared for those... Regulations That Significantly Affect Energy Supply, Distribution, or Use The regulatory impact analysis... specified on the standard application form, applicants must submit a feasibility study, performed by an...

  14. Bavarian pilot plants for te production of biogas. Results from five years of monitoring; Bayerische Pilotbetriebe zur Biogasproduktion. Ergebnisse aus fuenf Jahren Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Effenberger, Mathias; Ebertseder, Florian; Kissel, Rainer [Bayerische Landesanstalt fuer Landwirtschaft, Freising (Germany). Inst. fuer Landtechnik und Tierhaltung; Djatkov, Djordje [Novi Sad Univ. (Serbia). Lehrstuhl fuer Biosystemtechnik

    2012-11-15

    For more than five years, the Institute for Agricultural Engineering and Animal Husbandry (Freising, Federal Republic of Germany) performs a monitoring of agricultural biogas plants in Bavaria (Federal Republic of Germany). The results and experiences from the observations of already 21 so-called Bavarian pilot plants are a source of information for consultants, practitioners and scientists. The analysis of the development of individual plants over several years is particularly informative. In many cases, the power plants of the first campaign have an insufficient thermal utilization. Throughout the years, the concept of the thermal utilization was improved continuously improved. In connection with this, the performance of the biogas plants was improved often. Thereby it could be shown that such a repowering is a meaningful risk for the stability and efficiency of the fermentation process. Thus, the repowering should be planned carefully. The long-term monitoring of biogas plants delivers not only insights into the state f the art of agricultural biogas plants, but also especially the scientific fundament for the development of consulting support for a targeted increase of the plant efficiency. A method was developed in order to evaluate the efficiency of biogas plants due to the documented state of the art and expert knowledge. However, the key performance indicators of the plant have to be set carefully so that the consulting support is loadable. Under this aspect, this branch of industry should be sensitized within the background of an increasing and in partial authorized criticisms of the efficiency and environmental impact of biogas plants.

  15. Feasibility Study of Economics and Performance of Wind Turbine Generators at the Newport Indiana Chemical Depot Site

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, Joseph Owen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, Gail [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Newport Indiana Chemical Depot site in Newport, Indiana, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the sitefor possible wind turbine electrical generator installation and estimate the cost, performance, and site impacts of different wind energy options. In addition, the report recommends financing options that could assist in the implementation of a wind system at the site.

  16. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Santo Domingo Pueblo in Sandoval County, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Geiger, J.; Lisell, L.; Mosey, G.

    2013-07-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Pueblo of Santo Domingo in Sandoval County, New Mexico, for a renewable energy production feasibility study. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess specific areas on the Pueblo for potential installation of photovoltaic (PV) systems and to estimate the cost, performance, and site impacts of different PV options. The report also recommends financing options that could assist in the implementation of these PV systems.

  17. ECONOMICS AND FEASIBILITY OF RANKINE CYCLE IMPROVEMENTS FOR COAL FIRED POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Richard E. Waryasz; Gregory N. Liljedahl

    2004-09-08

    study therefore determines the steam cycle parameters and combustion technology that would yield the lowest cost of electricity (COE) for the next generation of coal-fired steam power plants. The second part of the study (Repowering) explores the means of upgrading the efficiency and output of an older existing coal fired steam power plant. There are currently more than 1,400 coal-fired units in operation in the United States generating about 54 percent of the electricity consumed. Many of these are modern units are clean and efficient. Additionally, there are many older units in excellent condition and still in service that could benefit from this repowering technology. The study evaluates the technical feasibility, thermal performance, and economic viability of this repowering concept.

  18. More power and heat for citizens of Vienna. Repowering of Heizkraftwerks Simmering; Mehr Strom und Waerme fuer die Buerger Wiens. Repowering des Heizkraftwerks Simmering

    Energy Technology Data Exchange (ETDEWEB)

    Jopp, Klaus [WiWiTech, Hamburg (Germany)

    2010-07-01

    Presented is the modernization of power plant Simmering with advanced on-line control systems and intelligent it-solutions. It is the most advanced and efficient GAS-power plant in Europe. Since inauguration in May 2009 the plant supplies more than 800 000 households and more than 7 000 industrial customers by power and barely 200 000 households by heat. (orig./GL)

  19. EPA RE-Powering Mapper: Alternative Energy Potential at Cleanup Sites

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management’s (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated...

  20. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production-Case studies

    International Nuclear Information System (INIS)

    Grammelis, P.; Koukouzas, N.; Skodras, G.; Kakaras, E.; Tumanovsky, A.; Kotler, V.

    2006-01-01

    The paper aims to present the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NO x abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new Circulating Fluidized Bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station

  1. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production case studies

    Energy Technology Data Exchange (ETDEWEB)

    P. Grammelis; N. Koukouzas; G. Skodras; E. Kakaras; A. Tumanovsky; V. Kotler [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), Ptolemaida (Greece)

    2006-11-15

    The paper reviews the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and presents two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NOx abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new circulating fluidized bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station. 11 refs., 15 figs., 7 tabs.

  2. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production-Case studies

    Energy Technology Data Exchange (ETDEWEB)

    Grammelis, P. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece) and Laboratory of Steam Boilers and Thermal Plants, Mechanical Engineering Department, National Technical University of Athens, Athens (Greece)]. E-mail: pgra@central.ntua.gr; Koukouzas, N. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Skodras, G. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Kakaras, E. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Laboratory of Steam Boilers and Thermal Plants, Mechanical Engineering Department, National Technical University of Athens, Athens (Greece); Tumanovsky, A. [VTI All Russia Thermal Engineering Institute (Russian Federation); Kotler, V. [VTI All Russia Thermal Engineering Institute (Russian Federation)

    2006-11-15

    The paper aims to present the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NO {sub x} abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new Circulating Fluidized Bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station.

  3. Technical Feasibility Study for Deployment of Ground-Source Heat Pump Systems: Portsmouth Naval Shipyard -- Kittery, Maine

    Energy Technology Data Exchange (ETDEWEB)

    Hillesheim, M.; Mosey, G.

    2014-11-01

    The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. Portsmouth Naval Shipyard (PNSY) is a United States Navy facility located on a series of conjoined islands in the Piscataqua River between Kittery, ME and Portsmouth, NH. EPA engaged NREL to conduct a study to determine technical feasibility of deploying ground-source heat pump systems to help PNSY achieve energy reduction goals.

  4. Hybrid combined cycle power plant

    International Nuclear Information System (INIS)

    Veszely, K.

    2002-01-01

    In case of re-powering the existing pressurised water nuclear power plants by the proposed HCCPP solution, we can increase the electricity output and efficiency significantly. If we convert a traditional nuclear power plant unit to a HCCPP solution, we can achieve a 3.2-5.5 times increase in electricity output and the achievable gross efficiency falls between 46.8-52% and above, depending on the applied solution. These figures emphasise that we should rethink our power plant technologies and we have to explore a great variety of HCCPP solutions. This may give a new direction in the development of nuclear reactors and power plants as well.(author)

  5. Rates and rites of passage: The use of natural gas in power plants

    International Nuclear Information System (INIS)

    Bloom, D.I.

    1995-01-01

    There are many advantages to the use of natural gas in new or repowered electric generating facilities. These include lower capital costs, positive environmental impacts, the use of proven technology, and an adequate resource base with a highly reliable and flexible transportation system. However, it is also clear that FERC's regulation of pipeline rates and operating practices has a direct impact on the bottom line of electric generators. a sober understanding of these rules, a careful integration of the rules into project documents, and a more commercial approach to transportation contracts will enhance the revenues and control the risks of the financially successful gas-fired electric generators

  6. Biogas in agriculture. Status and prospects. Proceedings; Biogas in der Landwirtschaft. Stand und Perspektiven. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    emissions and optimization of the humus balance (Kurt Moeller); (18) Evaluation of greenhouse gases from agricultural biogas plants by means of emission measurements (Jan Liebetrau); (19) Greenhouse gas balances and CO{sub 2}-eq abatement costs of agricultural biogas plants (Ursula Roth); (20) Mixtures of wild plants for production of biogas (Birgit Vollrath); (21) Utilization of straw as a fermentation substrate by means of digestion of straw (Stefan Droege); (22) Biogas from algae, seaweed and seagrass? (Helga Schneider); (23) Common project of farmers and public utilities - Feeding of biogas with amine purification (Johannes Steinhauer); (23) Feeding bio methan from the view of a plant operator (Thomas Balling); (24) Potentials for an optimized and resources carefully delivery of bio methan - Guidelines for a further expansion for biogas utilization (Wolfgang Urban); (25) Repowering of biogas plants (Anton Baumann); (26) Repowering of biogas plants for enhancing the process efficiency (Matthias Effenberger); (27) From troubled kid to star performers - On the repowering of a biogas plant (Hans-Werner Gress). Furthermore, 55 posters were presented.

  7. Technical and economic assessments commercial success for IGCC technology in China

    International Nuclear Information System (INIS)

    Xiong, T.

    1998-01-01

    The experiences gained from several Integrated Gasification Combined Cycle (IGCC) demonstration plants operating in the US and Europe facilitate commercial success of this advanced coal-based power generation technology. However, commercialization of coal-based IGCC technology in the West, particularly in the US, is restricted due to the low price of natural gas. On the contrary, in China--the largest coal producer and consumer in the world--a lack of natural gas supply, strong demand for air pollution control and relatively low costs of manufacturing and construction provide tremendous opportunities for IGCC applications. The first Chinese IGCC demonstration project was initiated in 1994, and other potential IGCC projects are in planning. IGCC applications in re-powering, fuel switching and multi-generation also show a great market potential in China. However, questions for IGCC development in China remain; where are realistic opportunities for IGCC projects and how can these opportunities be converted into commercial success? The answers to these questions should focus on the Chinese market needs and emphasize economic benefits, not just clean, or power. High price of imported equipment, high financing costs, and the technical risk of first-of-a-kind installation barricade IGCC development in China. This paper presents preliminary technical and economic assessments for four typical IGCC applications in the Chinese marketplace: central power station, fuel switching, re-powering, and multi-generation. The major factors affecting project economics--such as plant cost, financing, prices of fuel and electricity and operating capacity factor--are analyzed. The results indicate that well-proven technology for versatile applications, preferred financing, reduction of the plant cost, environmental superiority and appropriate project structure are the key for commercial success of IGCC in China

  8. Conference on wind power development in the face of landscape and local project acceptability challenges

    International Nuclear Information System (INIS)

    Victoire Lejzerzon; Sauron, Claire; Villot, Marie; Ratzbor, Guenter; Tausch, Christian; Cagneaux, Bertrand; Jouneau, Agathe; Stemmer, Boris; Huebner, Gundula; Orozco-Souel, Paola; Lhermitte, Charles; Ferus, Elisabeth; Benezech, Philippe; Gunzelmann, Thomas

    2015-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on n wind power development in the face of landscape and local project acceptability challenges. In the framework of this French-German exchange of experience, participants addressed the following points: the conciliation between landscape protection and wind power development, the definition of landscape environmental quality criteria, the needs and usages of the departments in charge of the treatment of landscape studies in France, the socio-psychological approach of the local acceptability of wind farm projects, the re-powering tool for the improvement of the wind farm integration in the landscape, and the conciliation between the monuments maintenance and wind power development. This document brings together the available presentations (slides) made during this event: 1 - Conciliating landscape protection and wind power development goals in France (Marie Villot); 2 - Wind turbines: Conflicts between development goals, landscape and acceptance - Perception and criteria (Guenter Ratzbor); 3 - Bayern's wind power atlas: a planning tool which takes into account the landscape aspects (Christian Tausch); 4 - Landscape assessment in wind farms projects: what and how to do in French administrative procedures? (Bertrand Cagneaux); 5 - Methods for evaluation of landscape for wind farms projects - A French project developer's feedback (Agathe Jouneau); 6 - Landscape Assessment: Methods from German Landscape Practice (Boris Stemmer); 7 - Acceptance of Wind Turbines - Social Psychological Research (Gundula Huebner); 8 - Local consultation: who to involve, when and how? (Paola Orozco-Souel); 9 - Local acceptability: what dialogue concepts and strategies, and how to manage wind energy objection (Charles Lhermitte); 10 - Re-powering and landscape: chances and limits (Elisabeth Ferus); 11 - Wind power and cultural heritage: consultation and dialogue to succeed (Philippe Benezech); 12

  9. Using Net-Zero Energy Projects to Enable Sustainable Economic Redevelopment at the Former Brunswick Air Naval Base

    Energy Technology Data Exchange (ETDEWEB)

    Huffman, S.

    2011-10-01

    A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites. The Brunswick Naval Air Station is a naval air facility and Environmental Protection Agency (EPA) Super Fund site that is being cleaned up, and closed down. The objective of this report is not only to look at the economics of individual renewable energy technologies, but also to look at the systemic benefits that can be gained when cost-effective renewable energy technologies are integrated with other systems and businesses in a community; thus multiplying the total monetary, employment, and quality-of-life benefits they can provide to a community.

  10. Putney Basketville Site Biomass CHP Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, Randolph [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, Gail [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-10-01

    The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response Center for Program Analysis developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The Putney, Vermont, Basketville site, formerly the location of a basket-making facility and a paper mill andwoolen mill, was selected for a feasibility study under the program. Biomass was chosen as the renewable energy resource based on abundant woody-biomass resources available in the area. Biomass combined heat and power (CHP) was selected as the technology due to nearby loads, including Putney Paper and Landmark College.

  11. Proceedings of the American Power Conference. Volume 58-I

    International Nuclear Information System (INIS)

    McBride, A.E.

    1996-01-01

    This is volume 58-I of the proceedings of the American Power Conference, 1996, Technology for Competition and Globalization. The topics of the papers include power plant DC issues; cost of environmental compliance; advanced coal systems -- environmental performance; technology for competition in dispersed generation; superconductivity technologies for electric utility applications; power generation trends and challenges in China; aging in nuclear power plants; innovative and competitive repowering options; structural examinations, modifications and repairs; electric load forecasting; distribution planning; EMF effects; fuzzy logic and neural networks for power plant applications; electrokinetic decontamination of soils; integrated gasification combined cycle; advances in fusion; cooling towers; relays; plant controls; flue gas desulfurization; waste product utilization; and improved technologies

  12. Mexican geothermal development and the future

    International Nuclear Information System (INIS)

    Serrano, J.M.E.V.

    1998-01-01

    Geothermics in Mexico started in 1954, by drilling the first geothermal well in Pathe, State of Hidalgo, which reached a depth of 237 meters. In 1959 electrical generation from geothermal origin began, with an installed capacity of 3.5 MW. From 1959 to 1994 Mexico increased its installed capacity to 753 MW, by developing three geothermal fields: Cerro Prieto, Los Azufres, and Los Humeros. Currently, 177 wells produce steam at a rate of 36 tons per hour (t/h) each. Comision Federal de Electricidad (CFE, Federal Commission of Electricity) has planned to increase the geothermal-electric installed capacity through construction and installation of several projects. Repowering of operating units and development of new geothermal zones will also allow Mexican geothermal growth

  13. Thermodynamic analysis and conceptual design for partial coal gasification air preheating coal-fired combined cycle

    Science.gov (United States)

    Xu, Yue; Wu, Yining; Deng, Shimin; Wei, Shirang

    2004-02-01

    The partial coal gasification air pre-heating coal-fired combined cycle (PGACC) is a cleaning coal power system, which integrates the coal gasification technology, circulating fluidized bed technology, and combined cycle technology. It has high efficiency and simple construction, and is a new selection of the cleaning coal power systems. A thermodynamic analysis of the PGACC is carried out. The effects of coal gasifying rate, pre-heating air temperature, and coal gas temperature on the performances of the power system are studied. In order to repower the power plant rated 100 MW by using the PGACC, a conceptual design is suggested. The computational results show that the PGACC is feasible for modernizing the old steam power plants and building the new cleaning power plants.

  14. Energy conservation technologies based on thermodynamic principles

    Energy Technology Data Exchange (ETDEWEB)

    Hirata, Masaru [Shibaura Institute of Technology of Technology, Tokyo (Japan)

    1996-12-31

    In order to reduce CO{sub 2} emission to prevent global warming, the most promising way for electric generation in the Northeast Asia is to introduce cogeneration and {open_quotes}repowering{close_quotes} technologies based on high temperature gas turbines fueled by natural gas. Especially the old type coal burning boiler-steam turbine plants should be retrofit by introducing gas turbines to become highly efficient combined cycle. Same technologies should be applied to the old garbage incineration plants and/or even to the nuclear power plants. The exhaust heat or steam should become much increased and it should be utilized as the process heat for industries or heat supply as the distinct heating or cooling for residential area. This paper introduces a brief survey of these new technologies.

  15. Air pollution impacts from demand-side management

    International Nuclear Information System (INIS)

    Hall, D.C.; Sandii Win, M.; Hall, J.V.

    1995-01-01

    Air-polluting emission rates and energy-efficiency ratings vary widely among power plants, depending on location, age and whether the power plant is repowered. Traditional regulations require installation of specified emission control equipment that varies among power plants. These regulations do not specify that utilities first dispatch the cleanest power plants as demand varies from peak to off-peak periods. This empirical analysis shows, for 2 years out of 20, that demand-side management (DSM) programs increase air pollution. One reason for this result is that regulations require installation of specific emission-control technology but do not provide the incentive to take actual emissions or their air quality impacts into account when operating the system. For certain types of air pollutants and in some regions, regulatory programs now include markets for tradable emission credits. Such programs may alter this incentive. (author)

  16. Feasibility Study of Economics and Performance of Solar PV at the Atlas Industrial Park in Duluth, Minnesota

    Energy Technology Data Exchange (ETDEWEB)

    Steen, M.; Lisell, L.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA) Region 5, in accordance with the RE-Powering America's Land initiative, selected the Atlas Industrial Park in Duluth, Minnesota, for a feasibility study of renewable energy production. The EPA provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of solar renewable energy generation at the Atlas Industrial Park. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this study is to assess the site for a possible PV installation and estimate the cost, performance, and site impacts of different PV configurations. In addition, the study evaluates financing options that could assist in the implementation of a PV system at the site.

  17. Navy Energy Forum - Seapower Repowered: Energy as a Force Multiplier and Strategic Resource

    Science.gov (United States)

    2010-10-13

    of energy Enablers: Policy Where a policy change will enhance energy security without negatively impacting readiness, the Navy will favor... Energy Security • Green fuels certification and use across land, sea, air installations and platforms • Fuel (Gallons) – Impact 3 billion gallons...Management System & lighting upgrades ■ Improved Quality of Life & future MilCon Savings: New central chillers ■ Energy Security: Cogeneration plant

  18. Lessons Learned from the Puerto Rico Battery Energy Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Boyes, John D.; De Anda, Mindi Farber; Torres, Wenceslao

    1999-08-11

    The Puerto Rico Electric Power Authority (PREPA) installed a battery energy storage system in 1994 at a substation near San Juan, Puerto Rico. It was patterned after two other large energy storage systems operated by electric utilities in California and Germany. The Puerto Rico facility is presently the largest operating battery storage system in the world and has successfully provided frequency control, voltage regulation, and spinning reseme to the Caribbean island. The system further proved its usefulness to the PREPA network in the fall of 1998 in the aftermath of Hurricane Georges. However, the facility has suffered accelerated cell failures in the past year and PREPA is committed to restoring the plant to full capacity. This represents the first repowering of a large utility battery facility. PREPA and its vendors and contractors learned many valuable lessons during all phases of project development and operation, which are summarized in this paper.

  19. EPCOR Utilities Inc. 1998 annual report

    International Nuclear Information System (INIS)

    1999-01-01

    Financial information from EPCOR Utilities Inc. and a review of their 1998 operations was presented. EPCOR was incorporated in 1995 and established as parent of Edmonton Power, Aqualta and Eltec in 1996. The city of Edmonton is the sole shareholder. EPCOR showed strong financial results and operational achievements in 1998. Among the many achievements were the efforts to ensure that the electric power systems are ready for the year 2000. Reduction of CO 2 emissions was another task pursued with good results. The electric power utility also invested in the re-powering of the Rossdale Generating Station and participated in the co-generation project at Joffre. The report provides details of these and other operational activities and presents consolidated financial statements. A new work management system to improve operational excellence and to better serve EPCOR customers during power disturbances was also launched during the year under review. tabs., figs

  20. Optimal Sizing and Placement of Power-to-Gas Systems in Future Active Distribution Networks

    DEFF Research Database (Denmark)

    Diaz de Cerio Mendaza, Iker; Bhattarai, Bishnu Prasad; Kouzelis, Konstantinos

    2015-01-01

    Power-to-Gas is recently attracting lots of interest as a new alternative for the regulation of renewable based power system. In cases, where the re-powering of old wind turbines threatens the normal operation of the local distribution network, this becomes especially relevant. However, the design...... -investment cost- and the technical losses in the system under study. The results obtained from the assessed test system show how such non-linear methods could help distribution system operators to obtain a fast and precise perception of what is the best way to integrate the Power-to-Gas facilities...... of medium voltage distribution networks does not normally follow a common pattern, finding a singular and very particular layouts in each case. This fact, makes the placement and dimensioning of such flexible loads a complicated task for the distribution system operator in the future. This paper describes...

  1. Wind above the treetops; Ueber den Wipfeln

    Energy Technology Data Exchange (ETDEWEB)

    Treder, Joachim [HSH Nordbank AG, Hamburg (Germany). Origination Energy

    2013-03-15

    The actual developments in policy, economy and society - especially the financial and economic crisis - attend the discussion on a sustainable energy supply. The financing of wind power projects and the reliability of the tariff regime are the decisive preconditions for the realisation of wind power projects. The Federal Government aspires to an amount of 35 per cent of the renewable energy sources at the power supply up to the year 2020. In addition to the utilization of sites by repowering, new priority areas are recognized by the authorities for the energy policy turnaround with wind power. Especially forest areas are focused. Thus, forest areas are attractive for project planners, investors and banks. If the technology supplies a stable and predictable output in the long-term, and if the Federal Government pretends a precise and reliable legal and regulatory environment, an economic utilization of wind power is possible in form of a project financing.

  2. The French market of wind energy and its perspectives. Which evolution for the competition landscape in a disrupting regulatory context?

    International Nuclear Information System (INIS)

    2010-11-01

    This article presents the content of a market study which aimed at providing an overview of the development of wind energy in France after market lift-off, at assessing the influence of Grenelle II on this sector, at assessing the competitiveness of wind energy with respect to other production sources, and at analysing strategies of equipment manufacturers and operators on a market where competitive positions are from being fixed. The report proposes an overview of the French wind energy market (legal context, growth dynamics, market valorisation, cost structure and profitability, support measures), analyses the positions and challenges of wind turbine manufacturers (the front end of the sector) and of wind farm developers and operators (the back end of the sector). Several manufacturers (Areva, Enercon, Gamesa, GE Energy, Nordex, REpower, Siemens and Vestas) and developers and operators (Boralex, EDF Energies Nouvelles, EDP Renovavels, Eolfi, GDF Suez, Iberdrola Renovables, Poweo, Theolia) have been analysed

  3. Trends in GCC technology

    International Nuclear Information System (INIS)

    Schmoe, L.E.; Ip, S.

    1992-01-01

    Over the last next decade, a combination of technical, environmental, and economic trends will encourage the commercial deployment of gasification combined cycle (GCC) technology. In the near-term, gas-fired combined cycles will likely be the economic and environmental technology of choice due to currently attractive natural gas prices. As gas prices increase over the next decade, GCC plants will become competitive and, in many cases, more economic than gas-fired options. This paper reports that the degree of penetration of GCC technology into the market will depend to some extent on the successful demonstration of a variety of technology enhancements. Many of these advancements will be proven in projects currently in progress, while others are still on the drawing boards. The first wave of GCC projects will likely take advantage of niche situations or benefit from government funding. but as GCC economics become more widely favorable, the plants will benefit from their flexibility to match grassroots, repowering, refueling, cogeneration, and chemical coproduction opportunities

  4. MANAGEMENT BOARD MEETING OF 30 SEPTEMBER 1999

    CERN Multimedia

    1999-01-01

    For informationOutcome of the September meetings of the Scientific Policy Committee, Finance Committee and Committee of Council.The Management Board's September meeting was mainly devoted to a review of the recent meetings of the Scientific Policy Committee, Finance Committee and Committee of Council. The Director-General reported on the following highlights:LHC Status ReportStatus reports on the LHC machine presented by L. Evans, the LHC Project Leader, had been well received by the Scientific Policy Committee and Committee of Council, which had expressed satisfaction at the progress made. Informing them of an accident that had occurred during the testing of the first long LHC dipole as an illustration of problems encountered and successfully overcome, Dr Evans had explained that sparking in the 15-m dipole had resulted in significant external damage and an unprotected quench. After re-tuning, however, the magnet had been successfully re-powered to reach well above the nominal field at first quench, thus dem...

  5. Wind energy scenarios up to 2020. Developments in the Netherlands in the framework of the SDE regulation

    International Nuclear Information System (INIS)

    Hoving, P.

    2009-04-01

    The Dutch government relies heavily on wind energy to reach the renewable energy target. Aim for the onshore installed capacity is 4,000 MW in 2020 and the offshore capacity target is 6,000 MW in 2020. In order to reach these targets, the so-called SDE subsidy mechanism exists. The regulation subsidises the financial gap of wind projects. It is unsure whether this SDE regulation, offers enough support to achieve the above targets. The main research question of this study was formulated as follows: Is it possible for the Dutch government to meet the 2020 targets for wind energy, as a part of the renewable energy targets, with the current SDE regulation or should the regulation be altered to create an improved contribution of wind energy? To answer this question, several sub-questions were formulated concerning cost developments, capacity developments, and possible supporting subsidy strategies and the implementation of other policy measures. The research questions were answered with help of a specific spreadsheet model. Cost and capacity developments are the main elements of the model. Cost developments depend on learning effects, material costs and economic aspects. Long term expectations of these aspects are combined to sketch cost developments. Together with the electricity price (APX day-ahead base load index), the costs determine the financial gap of wind energy, that needs to be subsidised. A distinction is made between different capacity categories: new onshore wind turbines, new offshore wind farms and repowering. Repowering is defined as a combination of renewal projects for older onshore turbines which are renovated or replaced at the end of their economic lifetime. The capacity categories differ on the cost aspect and required subsidy payments, but also the capacity potential that can be achieved. The results show that in the most favourable scenario, the targets can be reached with an annual budget equal to that of the 2008 budget (800 million euro). A

  6. 75 FR 24873 - Notice of Funding Availability (NOFA) for Repowering Assistance Payments to Eligible Biorefineries

    Science.gov (United States)

    2010-05-06

    ... status, familial status, parental status, religion, sexual orientation, genetic information, political... part, of biological products, including renewable domestic agricultural materials and forestry...

  7. 77 FR 5232 - Notice of Funding Availability (NOFA) for Repowering Assistance Payments to Eligible Biorefineries

    Science.gov (United States)

    2012-02-02

    ..., age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an...

  8. Alternative energy balances for Bulgaria to mitigate climate change

    Science.gov (United States)

    Christov, Christo

    1996-01-01

    Alternative energy balances aimed to mitigate greenhouse gas (GHG) emissions are developed as alternatives to the baseline energy balance. The section of mitigation options is based on the results of the GHG emission inventory for the 1987 1992 period. The energy sector is the main contributor to the total CO2 emissions of Bulgaria. Stationary combustion for heat and electricity production as well as direct end-use combustion amounts to 80% of the total emissions. The parts of the energy network that could have the biggest influence on GHG emission reduction are identified. The potential effects of the following mitigation measures are discussed: rehabilitation of the combustion facilities currently in operation; repowering to natural gas; reduction of losses in thermal and electrical transmission and distribution networks; penetration of new combustion technologies; tariff structure improvement; renewable sources for electricity and heat production; wasteheat utilization; and supply of households with natural gas to substitute for electricity in space heating and cooking. The total available and the achievable potentials are estimated and the implementation barriers are discussed.

  9. The role of clean coal technologies in post-2000 power generation

    International Nuclear Information System (INIS)

    Salvador, L.A.; Bajura, R.A.; Mahajan, K.

    1994-01-01

    A substantial global market for advanced power systems is expected to develop early in the next century for both repowering and new capacity additions, Although natural gas-fueled systems, such as gas turbines, are expected to dominate in the 1990's, coal-fueled systems are expected to emerge in the 2000's as systems of choice for base-load capacity because of coal's lower expected cost. Stringent environmental regulations dictate that all advanced power systems must be clean, economical, and efficient in order to meet both the environmental and economic performance criteria of the future. Recognizing these needs, the DOE strategy is to carry out an effective RD ampersand D program, in partnership with the private sector, to demonstrate these technologies for commercial applications in the next century. These technologies are expected to capture a large portion of the future power generation market. The DOE: expects that, domestically, advanced power systems products will be selected on the basis of varying regional needs and the needs of individual utilities. A large international demand is also expected for the new products, especially in developing nations

  10. Towards a prospective vision of professional stakes of land-based wind energy

    International Nuclear Information System (INIS)

    Tessier, Nathalie; Martin, Ludovic

    2017-07-01

    The authors report a study which first analyses how public policies have boosted the wind energy sector again since 2014 as shown by the increase of installed power and new wind energy connections in the different French regions, and also describes how the structure of this sector has been evolving (companies involved in turbine fabrication, exploitation, dismantling or re-powering). The second part, while outlining that job assessment and follow-up is complex, proposes an analysis of jobs and professions of the sector. The regional distribution of jobs is discussed, and some characteristics of the sector are highlighted through a profession-based approach. This discussion makes a distinction between professions related to public works, to metallurgy, to exploitation and maintenance. Some recommendations are made to improve the situation in some respects, often related to abilities and expertise. Some specific professions are defined through their requirements and expectations. The third part addresses the available specific education which is considered to answer correctly to most of needs. Some problems related to transverse professions and already met in other sectors are however outlined

  11. Commercialization of IGCC technology looks promising

    International Nuclear Information System (INIS)

    Smith, D.J.

    1992-01-01

    This paper reports that a major focus of the latest round of the U.S. Department of Energy's Clean Coal Technology Program was three large-scale, high-efficiency electricity generating projects which will rely on coal gasification rather than burning the coal directly. The three projects are: Toms Creek integrated gasification combined-cycle (IGCC) demonstration project. The aim of the project is to demonstrate improved coal-to-power efficiencies in an integrated gasification combined-cycle process. According to the DOE, the Toms Creek project will show that significant reductions in SO 2 and NO x emissions can be accomplished through the use of IGCC technology. On completion of the project, 107 MW of electric capacity will be added to the grid. Pinon Pine IGCC power project. The project's aim is to demonstrate that IGCC plants can be constructed at significantly lower capital costs, and with higher thermal efficiencies, than conventional power generation technologies. It will also demonstrate the effectiveness of hot gas cleanup for low-sulfur western coals. Wasbash River coal gasification repowering project

  12. Some data on the behaviour of kites (Milvus milvus, Milvus migrans nesting close to two active wind farms in Saxony, Germany

    Directory of Open Access Journals (Sweden)

    Busse Przemysław

    2017-12-01

    Full Text Available The main aim of this study was to evaluate how local pairs of kites behave in the vicinity of two wind farms located in the same region (Saxony, Germany and at farms which are to be re-powered. We observed three pairs that had located their nests close to active wind farms (a few hundred to 1500 m from the wind farm. Special attention was focused on variation in the intensity of flights and its dependence on the local landscape and to active avoidance of existing wind turbines. Observations were made at the end of the breeding time, when the young were still in the nest and shortly after fledging. Despite the short observation periods, the results seem to show clearly how differentiated the flight patterns of these birds are in relation to the landscape features around the farm. The distance from the nest to the wind farm cannot be the only measure of the level of potential wind-farm-related danger to the birds nesting close to the farm site.

  13. Market for new coal powerplant technologies in the US: 1997 annual energy outlook results

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J. [Dept. of Energy, Washington, DC (United States). Energy Information Administration

    1997-12-31

    Over the next 20 years, the combination of slow growth in the demand for electricity, even slower growth in the need for new capacity, especially baseload capacity, and the competitiveness of new gas-fired technologies limits the market for new coal technologies in the US. In the later years of the 1997 Annual Energy Outlook projections, post-2005, when a significant amount of new capacity is needed to replace retiring plants and meet growing demand, some new coal-fired plants are expected to be built, but new gas-fired plants are expected to remain the most economical choice for most needs. The largest market for clean coal technologies in the United States may be in retrofitting or repowering existing plants to meet stricter environmental standards, especially over the next 10 years. Key uncertainties include the rate of growth in the demand for electricity and the level of competing fuel prices, particularly natural gas. Higher than expected growth in the demand for electricity and/or relatively higher natural gas prices would increase the market for new coal technologies.

  14. Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Mosey, G.

    2012-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Johnson County Landfill in Shawnee, Kansas, for a feasibility study of renewable energy production. Citizens of Shawnee, city planners, and site managers are interested in redevelopment uses for landfills in Kansas that are particularly well suited for grid-tied solar photovoltaic (PV) installation. This report assesses the Johnson County Landfill for possible grid-tied PV installations and estimates the cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). Each option represents a standalone system that can be sized to use an entire available site area. In addition, the report outlines financing options that could assist in the implementation of a system. The feasibility of PV systems installed on landfills is highly impacted by the available area for an array, solar resource, operating status, landfill cap status, distance to transmission lines, and distance to major roads. The report findings are applicable to other landfills in the surrounding area.

  15. Survey report for fiscal 1998 on the conversion of the existing coal burning power plant to natural gas burning plant in Sakhalin State; 1998 nendo Saharinshu muke, kisetsu sekitandaki hatsuden no tennen gas daki tenkan chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The present survey is intended to discuss a modernization plan effective in reducing greenhouse effect gases for the two existing coal burning power plants in Sakhalin Island, Sakhalin State, the Federal Republic of Russia. The power plants are Sakhalinskaya Power Plant (GRES) and Yuzhno Sakalinskaya Power Plant (TETs-1). Simultaneously with converting the fuel from coal to natural gas, discussions are given on an optimal plan including introduction of the combined cycle and repowering technologies aiming at improving the thermal efficiency. Reduction in greenhouse effect gases, finance, and economy are evaluated. At the same time, verification will be given on environment improvement in Sakhalin Island, and influence on sustainable economic and social activation. The GRES modernization plan intends to build four combined cycle units each of 80 MW class to have nearly the same total capacity as the current total power generation facility capacity (315 MW). The TETs-1 modernization plan will convert the fuel for the existing boilers from coal to natural gas, modify one of the boilers whose construction is being suspended into gas burning boiler, and add gas turbines. (NEDO)

  16. Global environment and cogeneration

    International Nuclear Information System (INIS)

    Miyahara, Atsushi

    1992-01-01

    The environment problems on global scale have been highlighted in addition to the local problems due to the rapid increase of population, the increase of energy demand and so on. The global environment summit was held in Brazil. Now, global environment problems are the problems for mankind, and their importance seems to increase toward 21st century. In such circumstances, cogeneration can reduce carbon dioxide emission in addition to energy conservation, therefore, attention has been paid as the countermeasure for global environment. The background of global environment problems is explained. As to the effectiveness of cogeneration for global environment, the suitability of city gas to environment, energy conservation, the reduction of carbon dioxide and nitrogen oxides emission are discussed. As for the state of spread of cogeneration, as of March, 1992, those of 2250 MW in terms of power generation capacity have been installed in Japan. It is forecast that cogeneration will increase hereafter. As the future systems of cogeneration, city and industry energy center conception, industrial repowering, multiple house cogeneration and fuel cells are described. (K.I.)

  17. Environmental characteristics of clean coal technologies

    International Nuclear Information System (INIS)

    Bossart, S.J.

    1992-01-01

    The Department of Energy's (DOE) Clean Coal Technology (CCT) Program is aimed at demonstrating the commercial readiness of advanced coal-based technologies. A major goal of the CCT program is to introduce into the US energy marketplace those coal-based power generation technologies that have superior economic and environmental performance over the current suite of commercial coal-based power generation technologies. The commercialization of CCTs will provide the electric utility industry with technology options for replacing aging power plants and meeting future growth in electricity demand. This paper discusses the environmental advantages of two CCTs used for electric power generation: pressurized fluidized-bed combustion (PFBC) and integrated gasification combined-cycle (IGCC). These CCTs are suitable for repowering existing power plants or for grassroots construction. Due to their high efficiency and advanced environmental control systems, they emit less sulfur dioxide (SO 2 ), nitrogen oxides (NO x ), particulate matter, and carbon dioxide (CO 2 ) than a state-of-the-art, pulverized coal power plant with flue gas desulfurization (PC/FGD)

  18. The trillion dollar power project jackpot

    International Nuclear Information System (INIS)

    Roseman, E.J.

    1994-01-01

    International power needs, if not insatiable, are certainly of a magnitude beyond anything heretofore imagined. The international opportunities for independent power development are huge: Power Plants -- $700 to $800 billion worth of the new facilities will be needed by the year 2000; Transmission and Distribution -- Expansion of services will require an additional $300 to $400 billion; and Repowering and Improving Existing Plants -- The estimate is $40-$60 billion. RCG/Hagler, Bailly tracks the international power project development activities of over a hundred developers, and monitors the emerging private power market in Europe, Asia, and Latin America. On behalf of private clients and multi-lateral institutions, the authors have worked in more than three dozen countries in the past two years. There are far-reaching global implications involved in this massive movement toward independent power projects. New levels of international economic growth depend on it. Far greater energy efficiencies must accompany it. Environmental problems which will arise must be recognized and solved. The results from the trillion dollars that are to be invested will be far-reaching, dramatic, and vastly beneficial

  19. Solar repowering/industrial retrofit systems study: Gulf Mt. Taylor Uranium Mill solar retrofit. Final technical report

    International Nuclear Information System (INIS)

    1980-06-01

    This report covers the efforts in a nine month study to develop a site-specific conceptual design for solar industrial process heat retrofit of the Gulf Mt. Taylor Uranium Mill. This has resulted in preparation of a System Requirements Specification, conduct of trade studies leading to selection of a system concept, and conceptual design, performance, cost estimating and economic analysis of the selected concept. A baseline system with no storage and an alternative system with extended storage were evaluated. The baseline system with no storage was selected because it provides the best overall opportunity for fuel displacement, operating experience in industrial application and successful demonstration in the near term for both DOE and the user

  20. Study on gas turbines. Leading role of high efficiency power generation; Gas turbine kenkyu. Kokoritsu hatsuden no shuyaku wo nerau

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-31

    This review summarizes research works of Central Research Institute of Electric Power Industry on gas turbines playing a leading role of high efficiency power generation. This article describes historical changes of gas turbine technology, changes and current status from the viewpoint of electric power industry, and development trend in various makers. Increase in the flow-in gas temperature, low NOx combustion technology, use of various fuels, and durability evaluation and improvement technology for high temperature parts are described as technological problems and development trends. The increase in temperature is indispensable for the improvement of efficiency. Materials having heat resistance, anticorrosion and strength are required. Accordingly, Ni-based single crystal super alloy has been developed. Developments of ceramic gas turbine and catalytic combustor are also described. The coal gasification combined power generation is expected as a new power generation technology having availability of various coals, high efficiency, and excellent environmental protection. Development of 1500 {degree}C class combustor for turbines has been promoted. Evaluation and improvement of durability of high temperature parts are also described. For the new utilization technology of gas turbines, repowering and compressed air storage gas turbine power generation technology are introduced. 92 figs., 14 tabs.

  1. Focus on Bioenergy in the electricity and heat market. Project results 2015-2016

    International Nuclear Information System (INIS)

    Thraen, Daniela; Pfeiffer, Diana

    2017-01-01

    The report covers the following contributions: DeHoGas - sustainable local wood gasification plant with coupled micro gas turbine; SEVERA - sensor technique for efficient fermentation og biogenic residuals and wastes; FuelBand - extension of the fuel band of modern biomass combustion; REPOWERING - measures for efficiency improvement for the existing plants; PROKOSYS - processes, components and systems for flexible operation of biogas plants using biogenic residuals and wastes; Carola - electrostatic finest particle separator for flexible adaptation to biomass vessels; HydoCon - hydrolysis container - flexible plant components for substrate usage improvement in biogas plants; EFFIGEST - efficiency improvement in poultry manure fermentation using modified straw fractions and process integrated production of marketable fertilizer; FLUHKE - dry low-temperature entrained flow gasification with bio-coals from hydrothermal carbonization for local electricity and heat production with motor-cogeneration; REMISBIO - measures for emissions reduction of bio gas plants - catalyst test; Mini-bio-cogeneration - readiness of prototype for decentralized gasification of residual pellets for serial production; IbeKEt - innovative communal demand-adaptive energy carrier concept; Regiobalance - flexible bioenergy as regional compensation option in the German electricity market; FLEXHKW - flexible operation of cogeneration plants.

  2. Alternate Energy Report, Koleda Childress and Company

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-10-01

    This is a NEDO (New Energy and Industrial Technology Development Organization) report of October 1989, based on a Koleda Childress and Company of EPA report. Recent trends in U.S. policies toward the development of fossil and synthetic fuels are stated. President Bush has signed into law an appropriations bill for Round 3 of the Clean Coal Technology Program. The $575 million budget will become available in fiscal 1990. Forty-eight projects are planned to be selected, including the energy repowering and retrofitting programs. The President has further approved a $422 million Department of Energy budget for fiscal 1990 for the development of synthetic fuels by coal liquefaction, coal gasification, etc. The Department of Energy now considers a strategy in which energy security and environmental matters are linked. The amendment of the Clean Air Act proposed by President Bush last summer now activates Congress towards its enactment, which involves acid rain, automobile exhaust, etc. Trends in measures to deal with global warming are stated. Under consideration about tax policy is the extension of tax incentives for new energy technologies. Topics of coal/oil coprocessing, etc., are mentioned. (NEDO)

  3. Advanced power assessment for Czech lignite, Task 3.6, Part 2. The 2nd international conference on energy and environment: Transitions in East Central Europe

    Energy Technology Data Exchange (ETDEWEB)

    Sondreal, E.A.; Mann, M.D.; Weber, G.W.; Young, B.C.

    1995-12-01

    On November 1-5, 1994, the Energy & Environmental Research Center (EERC) and Power Research Institute of Prague cosponsored their second conference since 1991 in the Czech Republic, entitled ``Energy and Environment: Transitions in East Central Europe.`` This conference was a continuation of the EERC`s joint commitment, initiated in 1190, to facilitate solutions to short- and long-term energy and environmental problems in East Central Europe. Production of energy from coal in an environmentally acceptable manner is a critical issue facing East Central Europe, because the region continues to rely on coal as its primary energy source. The goal of the conference was to develop partnerships between industry, government, and the research community in East Central Europe and the United States to solve energy and environmental issues in a manner that fosters economic development. Among the topics addressed at the conference were: conventional and advanced energy generation systems; economic operation of energy systems; air pollution controls; power system retrofitting and repowering, financing options; regulatory issues; energy resource options; waste utilization and disposal; and long-range environmental issues. Selected papers in the proceedings have been processed separately for inclusion in the Energy Science and Technology database.

  4. Improvements in electric power system of the effluent treatment station of the hot strip mill no. 2 (ETE/LTQ-2); Melhorias no sistema de alimentacao eletrica da estacao de tratamento de efluentes do laminador de tiras a quente n. 2 (ETE/LTQ-2)

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Hamilton Geraldo; Pinho, Wilson Pereira de; Martinez, Flavio Costa; Rocha, Carlos Eduardo da [Companhia Siderurgica Nacional (CSN), Volta Redonda, RJ (Brazil). Gerencia de Distribuicao de Energeticos

    2011-12-21

    The ETE/LTQ-2 is an vital area for the production process of coiled hot rolled strip. Any problems in the operating functions in this station results in the loss production in the mill. This is what occurred in 2007 January when there was problems in the termination of the power cables from the transformer of the circuit B-521 and in December in the same year, when there was an explosion of the oil cutout switch, which resulted in serious injury to the production process of the LTQ-2. Thus, began a search process for solutions to improve the reliability and security of the electrical system that meets the motor pumps of the ETE/LTQ-2 to reduce the risk of interference in the production process in result of the electrical faults. In 2010 June, was completed the implementations of the solutions to improve this performance, which consisted of repowering the two power circuits of the ETE/LTQ-2 (B-521 and B-570), replacement of the transformers for others of higher power (3.75 MVA to 5.5 MVA) of both circuits and replacement the oil cutout switch for SF6 circuit breakers. (author)

  5. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  6. Energy planning on local scale. Remarks on Livorno city experience; La pianificazione energetica su scala locale. Riflessioni sull`esperienza della citta` di Livorno

    Energy Technology Data Exchange (ETDEWEB)

    Butta, Renato [Comune di Livorno (Italy). Dipt. Ambiente

    1996-12-31

    The area of Municipality of Livorno is classified, by European Union Structural Funds, as an Objective 2. As all the Italian cities over 50,000 inhabitants, Livorno is requested by the national law n. 10/91, to adopt an Energy Plan and to integrate in with the local use Plan. The main tasks of the Energy Plan of Livorno are: I. Reduce or mitigate the industrial decline in the city, developing coordinated strategies in the field of production energy efficiency; II. Define guide-lines and energy indicators for the Land use Plan, focused on the residential sector. The main priorities are: reduce the environmental impact of non renewable energy sources; reduce the energy local economic costs due to energy importation; improve the economic convenience of saving projects, reducing the use of sunk capital; integrate the energy aspects in the usual administrative procedures; carry out an Information System supporting the decisional process for public and private actors. The projects planned in the scenarios are: cogeneration plant, biogas utilisation from waste landfills, gas network pressure jamp, renewable energies in public building stock, energy saving in residential building, district heating system connected with the repowered thermoelectric power plant.

  7. Controlling air pollution from passenger ferries: cost-effectiveness of seven technological options.

    Science.gov (United States)

    Farrell, Alexander E; Corbett, James J; Winebrake, James J

    2002-12-01

    Continued interest in improving air quality in the United States along with renewed interest in the expansion of urban passenger ferry service has created concern about air pollution from ferry vessels. This paper presents a methodology for estimating the air pollution emissions from passenger ferries and the costs of emissions control strategies. The methodology is used to estimate the emissions and costs of retrofitting or re-powering ferries with seven technological options (combinations of propulsion and emission control systems) onto three vessels currently in service in San Francisco Bay. The technologies include improved engine design, cleaner fuels (including natural gas), and exhaust gas cleanup devices. The three vessels span a range of ages and technologies, from a 25-year-old monohull to a modern, high-speed catamaran built only four years ago. By looking at a range of technologies, vessel designs, and service conditions, a sense of the broader implications of controlling emissions from passenger ferries across a range of vessels and service profiles is provided. Tier 2-certified engines are the most cost-effective choice, but all options are cost-effective relative to other emission control strategies already in place in the transportation system.

  8. Focus on Bioenergy in the electricity and heat market. Project results 2015-2016; Focus on Bioenergie im Strom- und Waermemarkt. Projektergebnisse 2015-2016

    Energy Technology Data Exchange (ETDEWEB)

    Thraen, Daniela; Pfeiffer, Diana (eds.)

    2017-08-01

    The report covers the following contributions: DeHoGas - sustainable local wood gasification plant with coupled micro gas turbine; SEVERA - sensor technique for efficient fermentation og biogenic residuals and wastes; FuelBand - extension of the fuel band of modern biomass combustion; REPOWERING - measures for efficiency improvement for the existing plants; PROKOSYS - processes, components and systems for flexible operation of biogas plants using biogenic residuals and wastes; Carola - electrostatic finest particle separator for flexible adaptation to biomass vessels; HydoCon - hydrolysis container - flexible plant components for substrate usage improvement in biogas plants; EFFIGEST - efficiency improvement in poultry manure fermentation using modified straw fractions and process integrated production of marketable fertilizer; FLUHKE - dry low-temperature entrained flow gasification with bio-coals from hydrothermal carbonization for local electricity and heat production with motor-cogeneration; REMISBIO - measures for emissions reduction of bio gas plants - catalyst test; Mini-bio-cogeneration - readiness of prototype for decentralized gasification of residual pellets for serial production; IbeKEt - innovative communal demand-adaptive energy carrier concept; Regiobalance - flexible bioenergy as regional compensation option in the German electricity market; FLEXHKW - flexible operation of cogeneration plants.

  9. McIntosh Unit 4 PCFB demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, A.M. [Lakeland Electric and Water, FL (United States); Dryden, R.J. [Foster Wheeler Development Corp., San Diego, CA (United States); Morehead, H.T. [Westinghouse Electric Corp., Orlando, FL (United States)

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  10. Application of the Combined Cycle LWR-Gas Turbine to PWR for NPP Life Extension Safety Upgrade and Improving Economy

    International Nuclear Information System (INIS)

    Kuznetsov, Yu. N.

    2006-01-01

    Currently, some of the most important problem for the nuclear industry are life extension, advance competitiveness and safety of aging LWR NPPs. Based on results of studies performed in the USA (Battelle Memorial Institute) and in Russia (NIKIET), a new power technology, using a combined cycle gas-turbine facility CCGT - LWR, so called TD-Cycle, can significantly help in resolution of some problems of nuclear power industry. The nuclear steam and gas topping cycle is used for re-powering a light water pressurized reactor of PWR or VVER type. An existing NPP is topped with a gas turbine facility with a heat recovery steam generator (HRSG) generating steam from waste heat. The superheated steam of high pressure (P=90-165 bar, T=500-550 C) generated in the HRSG, is expanded in a high pressure (HP) turbine for producing electricity. The HP turbine can work on one shaft with the the gas turbine or at one shaft with intermediate (IP) or low (LP) pressure parts of the main nuclear steam turbine, or with a separate electric generator. The exhausted steam from the HP turbine is injected into the steam mixer where it is mixed with the saturated steam from the NPP steam generator (SG). The mixer is intended to superheat the main nuclear steam and should be characterized by minimum losses during mixing superheated and saturated steam. Steam from the mixer superheated by 20-60 C directs to the existing IP turbine, and then, through a separator-reheater flows into the LP turbine. Feed water re-heaters of LP and HP are actually unchanged in this case. Feed water extraction to the HRSG is supplied after one of LP water heaters. This proposal is intended to re-power existing LWR NPPs. To minimize cost, the IP and LP turbines and electric generator would remain the same. The reactor thermal power and fast neutron flux to the reactor vessel would decrease by 30-50 percent of nominal values. The external peripheral row of fuel elements can be replaced with metal absorber rods to

  11. FY 1999 achievement report on the supporting project to form energy/environmental technology verification project - International joint verification research project. Research on the waste-fueled power system using gases emitted from the sanitary landfill in Samarkand city; 1999 nendo Samarkand shi ni okeru umetate gas wo riyoshita gomi hatsuden system no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Samarkand city, Uzbekistan, solid waste materials are treated in the sanitary landfill. However, requests were made from the Minister of Communal Services for the construction of power system as a part of the effective waste utilization and the study of the integrated waste collection system enabling the construction of a power system. There is only one waste dumping site in Samarkand city. That started to be used in the beginning of the 1970s. That was planned to be closed in 2000, but is now planned to used till 2005. Therefore, it is urgent to reduce the volume of waste. The incineration of waste is the most suitable for it. In the study of a power system by using waste effectively, it is important to efficiently recover the methane gas emitted from the waste dumping site, to study the adoption of the repowering system using the combustion gas of methane gas for increasing the generated output of waste-fueled power generation facilities, and to heighten the low power generation efficiency. This study includes the survey of the waste discharge amount/composition/heating value, collection of the data on waste collection, and sampling/analysis of gases emitted from the dumping site. The paper reported on the proposals. (NEDO)

  12. Indian Wind Energy Outlook 2011

    International Nuclear Information System (INIS)

    Shukla, Shruti; Kharul, Rajendra; Sawyer, Steve; Patel, Narendra; Pullen, Angelika; Gorate, Devanand; Raghu, V.

    2011-12-01

    This report is a valuable tool for members of the wind industry and policy makers alike to learn about the market opportunities and the legal and regulatory framework in India. In addition, it gives us insights into the challenges going forward and offers suggestions for overcoming remaining hurdles for wind power development. According to the outlook 65.2 GW of wind power could be installed in Indian by 2020, up from 13.1 GW at the end of 2010. This would attract around USD 10.4bn of annual investment to the sector, and create 170,000 'green collar' jobs in manufacturing, project development, installation, operation, maintenance, consulting etc. At the same time, it would save 174 tons of CO2 every year. By 2030, the installed capacity could reach as much as 160.7 GW. In order to fully exploit the indigenous energy source at its doorstep, the Indian government needs to address several challenges and barriers that are holding back development. This includes a national renewable energy law, incentives for repowering, and rapid up-scaling of grid infrastructure to transport increasing amounts of wind power to the demand centres. It highlights the key role wind power could play in fueling India's growing energy demand, by delivering substantial amounts of clean energy.

  13. Beer bottle whistling: a stochastic Hopf bifurcation

    Science.gov (United States)

    Boujo, Edouard; Bourquard, Claire; Xiong, Yuan; Noiray, Nicolas

    2017-11-01

    Blowing in a bottle to produce sound is a popular and yet intriguing entertainment. We reproduce experimentally the common observation that the bottle ``whistles'', i.e. produces a distinct tone, for large enough blowing velocity and over a finite interval of blowing angle. For a given set of parameters, the whistling frequency stays constant over time while the acoustic pressure amplitude fluctuates. Transverse oscillations of the shear layer in the bottle's neck are clearly identified with time-resolved particle image velocimetry (PIV) and proper orthogonal decomposition (POD). To account for these observations, we develop an analytical model of linear acoustic oscillator (the air in the bottle) subject to nonlinear stochastic forcing (the turbulent jet impacting the bottle's neck). We derive a stochastic differential equation and, from the associated Fokker-Planck equation and the measured acoustic pressure signals, we identify the model's parameters with an adjoint optimization technique. Results are further validated experimentally, and allow us to explain (i) the occurrence of whistling in terms of linear instability, and (ii) the amplitude of the limit cycle as a competition between linear growth rate, noise intensity, and nonlinear saturation. E. B. and N. N. acknowledge support by Repower and the ETH Zurich Foundation.

  14. Environment-friendly type energy and coordinated community development project. Feasibility study for industrialization of high efficiency waste-fired power generation system (industrial refuse derived fuel and gas turbine combined type); Kankyo chowagata energy community keisei sokushin. Kokoritsu haikibutsu hatsuden (sangyo RDF GT fukugogata) jigyoka FS chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    High efficiency power generation, which is useful for promoting the environment-friendly type energy and coordinated community, is investigated by combining a steam turbine power generation system using the PS-RDF (paper sludge-refuse derived fuel) and a gas turbine (GT) combined cycle. Industrialization plan for processing PS in low cost has been made to ensure the profitability by participating the wholesale power supply under the law of electric power industry. This combined system is similar to the so-called super power generation using municipal garbage, but the lower temperature of steam from GT waste heat boilers (WHB) is super-heated by the flue gas from RDF boiler, which is called advanced power generation system (A.S.S.). The total power generation capacity is 149,000 kW, which consists of three 35,000 kW units of GT and one 44,000 kW unit of steam turbine. When comparing the combined system (A.S.S.) and usual one with the independent installation of the RDF steam power generation system and a GT combined cycle, the A.S.S. provides the repowering efficiency of 7,600 kW output with exactly the same quantity of fuel input as usual one. 71 figs., 31 tabs.

  15. Fossil fuels in a sustainable energy future

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel, T.F. [Dept. of Energy, Morgantown, WV (United States)

    1995-12-01

    The coal industry in the United States has become a world leader in safety, productivity, and environmental protection in the mining of coal. The {open_quotes}pick-and-shovel{close_quotes} miner with mangled limbs and black lung disease has been replaced by the highly skilled technicians that lead the world in tons per man-hour. The gob piles, polluted streams, and scared land are a thing of the past. The complementary efforts of the DOE and EPRI-funded programs in coal utilization R&D and the Clean Coal Technology Program commercial demonstrations, have positioned the power generation industry to utilize coal in a way that doesn`t pollute the air or water, keeps electrical power costs low, and avoids the mountains of waste material. This paper reviews the potential for advanced coal utilization technologies in new power generation applications as well as the repowering of existing plants to increase their output, raise their efficiency, and reduce pollution. It demonstrates the potential for these advanced coal-fueled plants to play a complementary role in future planning with the natural gas and oil fired units currently favored in the market place. The status of the US program to demonstrate these technologies at commercial scale is reviewed in some detail.

  16. American power conference: Proceedings. Volume 56-I

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The first volume of this conference contains papers on the following topics: (1) Controls, monitoring, and expert systems (Harnessing microprocessor revolution for a more competitive power industry; Plant control--Upgrades; Neural network applications); (2) Diversification and globalization (Electric utility diversification/globalization--Panel; Private power in developing countries); (3) Environment and clean air (Clean Air compliance costs; Site selection for power stations and related facilities; Electric utility trace substance emissions; Solid waste disposal and commercial use; Precipitators/fabric filters; and Effect of flow modifications on fisheries and water quality); (4) Generation--Fuel options ampersand equipment (Alternate fuels; Advances in fuel cells for electric power applications; Secondary containment and seismic requirements for petrochemical facilities; Clean coal technology demonstration; Advanced energy systems; Hydropower); (5) Nuclear operations ampersand options (Radioactive waste management and disposal; Off normal conditions; Advanced light water reactors--15 years after TMI; Structural dynamic analyses for nuclear power plants); (6) Retrofit, betterment, repowering ampersand maintenance (Project management; Improving competitiveness through process re-engineering; Central stations; Water and wastewater treatment); (7) System planning, operation ampersand demand maintenance (Transmission system access; Stability; Systems planning); (8) Transmission and distribution (Transformers; Relaying for system protection; Managing EMF effects); and (9) Education (Power engineering). 155 papers have been processed separately for inclusion on the data base

  17. PETC Review, Issue 6, Summer 1992

    Energy Technology Data Exchange (ETDEWEB)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J. [eds.

    1992-10-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation`s energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal`s competitiveness and to create a favorable export market for US coal and coal technology.

  18. PETC Review, Issue 6, Summer 1992

    Energy Technology Data Exchange (ETDEWEB)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J. (eds.)

    1992-01-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation's energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal's competitiveness and to create a favorable export market for US coal and coal technology.

  19. Renewable Energy Optimization Report for Naval Station Newport

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, R.; Mosey, G.; Olis, D.

    2012-02-01

    In 2008, the U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage the development of renewable energy (RE) on potentially contaminated land and mine sites. As part of this effort, EPA is collaborating with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate RE options at Naval Station (NAVSTA) Newport in Newport, Rhode Island. NREL's Renewable Energy Optimization (REO) tool was utilized to identify RE technologies that present the best opportunity for life-cycle cost-effective implementation while also serving to reduce energy-related carbon dioxide emissions and increase the percentage of RE used at NAVSTA Newport. The technologies included in REO are daylighting, wind, solar ventilation preheating (SVP), solar water heating, photovoltaics (PV), solar thermal (heating and electric), and biomass (gasification and cogeneration). The optimal mix of RE technologies depends on several factors including RE resources; technology cost and performance; state, utility, and federal incentives; and economic parameters (discount and inflation rates). Each of these factors was considered in this analysis. Technologies not included in REO that were investigated separately per NAVSTA Newport request include biofuels from algae, tidal power, and ground source heat pumps (GSHP).

  20. PETC Review, Issue 6, Summer 1992

    International Nuclear Information System (INIS)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J.

    1992-01-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation's energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal's competitiveness and to create a favorable export market for US coal and coal technology

  1. Development of Flexi-Burn™ CFB Power Plant to Meet the Challenge of Climate Change

    Science.gov (United States)

    Hackt, Horst; Fant, Zhen; Seltzert, Andrew; Hotta, Arto; Erikssoni, Timo; Sippu, Ossi

    Carbon-dioxide capture and storage (CCS) offers the potential for major reductions in carbon- dioxide emissions of fossil fuel-based power generation in the fairly short term, and oxyfuel combustion is one of the identified CCS technology options. Foster Wheeler (FW) is working on reduction of carbon-dioxide with its integrated Flexi-Burn™ CFB technology. The proven high efficiency circulating fluidized-bed (CFB) technology, when coupled with air separation units and carbon purification units, offers a solution for carbon dioxide reduction both in re-powering and in greenfield power plants. CFB technology has the advantages over pulverized coal technology of a more uniform furnace heat flux, increased fuel flexibility and offers the opportunity to further reduce carbon dioxide emissions by co-firing coal with bio-fuels. Development and design of an integrated Flexi-Bum™ CFB steam generator and balance of plant system was conducted for both air mode and oxyfuel mode. Through proper configuration and design, the same steam generator can be switched from air mode to oxyfuel mode without the need for unit shutdown for modifications. The Flexi-Burn™ CFB system incorporates features to maximize plant efficiency and power output when operating in the oxy-firing mode through firing more fuel in the same boiler.

  2. Assessment of the visual landscape impact and dominance of wind tubines in Austria using weighted viewshed maps

    Science.gov (United States)

    Schauppenlehner, Thomas; Salak, Boris; Scherhaufer, Patrick; Höltinger, Stefan; Schmidt, Johannes

    2017-04-01

    Due to efficiency reasons and broadly availability of wind, wind energy is in focus of strategies regarding the expansion of renewable energy and energy transition policies. Nevertheless, the dimensions of the wind turbines and rotating dynamics have a significant impact on the landscape scenery and recreation as well as tourism activities. This often leads to local opposition against wind energy projects and is a major criterion regarding the acceptance of wind energy. In the project TransWind, the social acceptance of wind energy is surveyed on the basis of different development scenarios for Austria. Therefore, a GIS-based viewshed indicator was developed to assess the visual impact of different development scenarios as well as the current situation using weighted - regarding distance, amount and masking - viewshed analysis. This weighted viewshed maps for Austria allows a comprehensive evaluation of existing and potential wind energy sites regarding dominance and visual impact and can contribute to the spatial development process of wind energy site. Different regions can be compared and repowering strategies can be evaluated. Due to the large project area, data resolutions, generalized assumptions (e.g. tree heights) and missing data (e.g. solitary trees, small hedges) at local level further analysis are necessary but it supports the assessment of large-scale development scenarios can be identified.

  3. Indian Wind Energy Outlook 2011

    Energy Technology Data Exchange (ETDEWEB)

    Shukla, Shruti; Kharul, Rajendra; Sawyer, Steve; Patel, Narendra; Pullen, Angelika; Gorate, Devanand; Raghu, V. (eds.)

    2011-12-15

    This report is a valuable tool for members of the wind industry and policy makers alike to learn about the market opportunities and the legal and regulatory framework in India. In addition, it gives us insights into the challenges going forward and offers suggestions for overcoming remaining hurdles for wind power development. According to the outlook 65.2 GW of wind power could be installed in Indian by 2020, up from 13.1 GW at the end of 2010. This would attract around USD 10.4bn of annual investment to the sector, and create 170,000 'green collar' jobs in manufacturing, project development, installation, operation, maintenance, consulting etc. At the same time, it would save 174 tons of CO2 every year. By 2030, the installed capacity could reach as much as 160.7 GW. In order to fully exploit the indigenous energy source at its doorstep, the Indian government needs to address several challenges and barriers that are holding back development. This includes a national renewable energy law, incentives for repowering, and rapid up-scaling of grid infrastructure to transport increasing amounts of wind power to the demand centres. It highlights the key role wind power could play in fueling India's growing energy demand, by delivering substantial amounts of clean energy.

  4. Regional differences in system usage charges. Impediment to a fair energy transition?; Regionale Unterschiede der Netznutzungsentgelte. Hindernis fuer eine faire Energiewende?

    Energy Technology Data Exchange (ETDEWEB)

    Plenz, Maik; Meister, Moritz; Doliwa, Martin; Obbelode, Felix [Leuphana Univ. Lueneburg (Germany). Forschungsprojekt EnERgioN

    2014-12-15

    The conversion of the German electricity supply system to production from renewable resources under the national energy transition policy is making it necessary to expand and restructure the distribution networks. Based on the expansion goals of the federal government, expectations are that thinly populated regions with low conflict potential will see a continued growth in distributed generation. This will increase the geographic asymmetry that exists between the production of renewable energy in rural, peripheral regions and its consumption predominantly in urban regions, thus enlarging the regional differences in system usage charges seen already today. The geographic disparity between production and consumption may grow larger still with the continuing installation of new and repowering of existing renewable energy plants. Of the possibilities discussed so far for reforming the scheme of charges, some would only have a weak impact, while others would even exacerbate the problem. The solution proposed in the present article takes account of the costs incurred through upstream supply networks in accordance with Article 14 Section 1 Sentence 1 of the Ordinance on System Usage Charges. In effect it leads to an allocation of costs according to the user-pays principle, thus protecting consumers connected to rural distribution networks against an undue cost burden and charging a fair share of the costs to consumers in urban and industrial distribution networks.

  5. Study and design of a hybrid wind-diesel-compressed air energy storage system for remote areas

    International Nuclear Information System (INIS)

    Ibrahim, H.; Younes, R.; Ilinca, A.; Dimitrova, M.; Perron, J.

    2010-01-01

    Remote areas around the world predominantly rely on diesel-powered generators for their electricity supply, a relatively expensive and inefficient technology that is responsible for the emission of 1.2 million tons of greenhouse gas (GHG) annually, only in Canada . Wind-diesel hybrid systems (WDS) with various penetration rates have been experimented to reduce diesel consumption of the generators. After having experimented wind-diesel hybrid systems (WDS) that used various penetration rates, we turned our focus to that the re-engineering of existing diesel power plants can be achieved most efficiently, in terms of cost and diesel consumption, through the introduction of high penetration wind systems combined with compressed air energy storage (CAES). This article compares the available technical alternatives to supercharge the diesel that was used in this high penetration wind-diesel system with compressed air storage (WDCAS), in order to identify the one that optimizes its cost and performances. The technical characteristics and performances of the best candidate technology are subsequently assessed at different working regimes in order to evaluate the varying effects on the system. Finally, a specific WDCAS system with diesel engine downsizing is explored. This proposed design, that requires the repowering of existing facilities, leads to heightened diesel power output, increased engine lifetime and efficiency and to the reduction of fuel consumption and GHG emissions, in addition to savings on maintenance and replacement cost.

  6. Advances in fluidized bed technologies

    International Nuclear Information System (INIS)

    Mutanen, K.

    1992-01-01

    Atmospheric fluidized bed combustion (AFBC) has advanced into industrial cogeneration and utility-scale electric generation. During the 1980's AFBC became the dominant technology in the United States for power generation systems fired with solid fuels. Development of pressurized fluidized bed combustion/gasification (PFB/G) has grown rapidly from small bench-scale rigs to large pilot and demonstration plants. AFBC as large as 160 MWe in capacity are now in operation, while pressurized combustion systems generating 80 MWe have started up two years ago. The major driving forces behind development of fluidized bed technologies are all the time strictening emission control regulations, need for fuel flexibility, repowering of older power plants and need for higher efficiency in electricity generation. Independent power producers (IPP) and cogenerators were the first ones in the United States who accepted AFBC for wide commercial use. Their role will be dominant in the markets of the 1990's also. Developers of AFBC systems are working on designs that reduce investment costs, decrease emissions and offer even higher reliability and availability in utility-scale applications while developers of PFBC/G work on designs that increase plant efficiencies, allow modular construction, decrease emissions further and reduce the cost of generating power. This paper presents technological background, commercial status, boiler performance, emissions and future developments for both AFBC and PFBC/G systems

  7. El extractivismo en la Revolución Bolivariana: “potencia energética mundial” y resistencias eco-territoriales

    Directory of Open Access Journals (Sweden)

    Emiliano Teran Mantovani

    2015-09-01

    Full Text Available El siguiente trabajo intenta mostrar los rasgos de la política extractiva en la Revolución Bolivariana, haciendo evidente cómo, a partir de 2004, se va reconfigurando un extractivismo repotenciado sobre la idea de llevar a Venezuela a ser una “potencia energética mundial” a partir de la explotación de la Faja Petrolífera del Orinoco. Al mismo tiempo, se muestran las dinámicas de disputa política que giran en torno a los llamados “recursos naturales”, los territorios del país y sus pobladores, tratando de evidenciar tanto las lógicas disciplinarias del Estado, como las diversas resistencias sociales al avance extractivista. Abstract This paper aims to show the features of extractive policy in the Bolivarian Revolution, making clear how, from 2004, a repowered extractivism is being reconfi-gured, based on the idea of taking Venezuela to be a “World Energy Power” providing the exploitation of the Orinoco Oil Belt. At the same time, the paper presents the dynamics of political dispute taking place around the so-called “natural resources”, the territories of the country and their inhabitants, in order to show both the disciplinary logic of the state, and the different social resistances against the advance of extractivism.

  8. New FACTS Equipment in an Enhanced Version of Smart Grids. The Magnetic Gate

    Directory of Open Access Journals (Sweden)

    Julio Enrique Posada C.

    2014-08-01

    Full Text Available This work is a qualitative proposal of a new FACTS device, which aims to repower the "Smart Grids", to a higher level. The existing FACTS that are covering the role of power flow control have the disadvantages of the use of electronic devices, and generate excessive heat and harmonics injected into the network. These devices are expensive and their regulation is binary: zero flow or total flow. This proposal offers a more versatile power flow control from zero to one hundred percent of its nominal capacity. Smart grids will no longer need to have a Relay Counseling Center, and the communication by pilot wire or other means available will be enough to control and protect the network. Therefore, due to fewer crossed and analyzed data, the laborious task of considering whether an event is really a failure, will be less complicated and will be carried out more quickly. In combination with phase measurement units (PMUs for each MAG, approximation techniques will not be necessary to estimate the variations caused by the dynamics of the demand, because the MAG is operating in "floating mode" as discussed further below. The network automatically and gradually rearranges these variations. Incomplete observation could be used for measuring voltage and current signals of the network in some specific points in the network.

  9. Ninth annual coal-fueled heat engines, advanced pressurized fluidized bed combustion, and gas stream cleanup systems contractors review meeting: Welcoming address

    International Nuclear Information System (INIS)

    Salvador, L.A.

    1992-01-01

    The market for retrofit and new capacity in the electric utility is expected to be very large: 250 gigawatt (GW) and 500 GW by the year 2030--an amount which equals the presently installed capacity in the US Overseas, the market is even larger exclamation point This large market will be driven by a number of key ''drivers.'' In order for power generation systems to compete in this market, they will have to satisfy the market drivers. This will lead us inevitably to modular, low cost, super clean, efficient, and reliable products which are fuel flexible and can meet either retrofit, repowering, or new capacity applications. I believe clean coal technologies that we are developing will meet these market demands and will penetrate--and eventually dominate--the power generation market of the next century. But for this market penetration and widespread deployment to take place, the products we are jointly developing must be continuously improved. We must together set our goals on a rapid march down the learning curve from the present high ''projected costs'' of these systems to an acceptable market clearing price on the order of $1000 to $1200 per kilowatt (kw) and with heat rates approaching 7500 Btu per kilowatt-hour (kWh). The projected learning curve for integrated gasification combined cycle systems is a good illustration of the aggressive goals we need to achieve

  10. Environmental implications of large-scale adoption of wind power: a scenario-based life cycle assessment

    International Nuclear Information System (INIS)

    Arvesen, Anders; Hertwich, Edgar G

    2011-01-01

    We investigate the potential environmental impacts of a large-scale adoption of wind power to meet up to 22% of the world’s growing electricity demand. The analysis builds on life cycle assessments of generic onshore and offshore wind farms, meant to represent average conditions for global deployment of wind power. We scale unit-based findings to estimate aggregated emissions of building, operating and decommissioning wind farms toward 2050, taking into account changes in the electricity mix in manufacturing. The energy scenarios investigated are the International Energy Agency’s BLUE scenarios. We estimate 1.7–2.6 Gt CO 2 -eq climate change, 2.1–3.2 Mt N-eq marine eutrophication, 9.2–14 Mt NMVOC photochemical oxidant formation, and 9.5–15 Mt SO 2 -eq terrestrial acidification impact category indicators due to global wind power in 2007–50. Assuming lifetimes 5 yr longer than reference, the total climate change indicator values are reduced by 8%. In the BLUE Map scenario, construction of new capacity contributes 64%, and repowering of existing capacity 38%, to total cumulative greenhouse gas emissions. The total emissions of wind electricity range between 4% and 14% of the direct emissions of the replaced fossil-fueled power plants. For all impact categories, the indirect emissions of displaced fossil power are larger than the total emissions caused by wind power.

  11. Regional differences in system usage charges. Impediment to a fair energy transition?

    International Nuclear Information System (INIS)

    Plenz, Maik; Meister, Moritz; Doliwa, Martin; Obbelode, Felix

    2014-01-01

    The conversion of the German electricity supply system to production from renewable resources under the national energy transition policy is making it necessary to expand and restructure the distribution networks. Based on the expansion goals of the federal government, expectations are that thinly populated regions with low conflict potential will see a continued growth in distributed generation. This will increase the geographic asymmetry that exists between the production of renewable energy in rural, peripheral regions and its consumption predominantly in urban regions, thus enlarging the regional differences in system usage charges seen already today. The geographic disparity between production and consumption may grow larger still with the continuing installation of new and repowering of existing renewable energy plants. Of the possibilities discussed so far for reforming the scheme of charges, some would only have a weak impact, while others would even exacerbate the problem. The solution proposed in the present article takes account of the costs incurred through upstream supply networks in accordance with Article 14 Section 1 Sentence 1 of the Ordinance on System Usage Charges. In effect it leads to an allocation of costs according to the user-pays principle, thus protecting consumers connected to rural distribution networks against an undue cost burden and charging a fair share of the costs to consumers in urban and industrial distribution networks.

  12. Wind energy use in Germany. Status 31.12.2011; Windenergienutzung in Deutschland. Stand 31.12.2011

    Energy Technology Data Exchange (ETDEWEB)

    Ender, C. [DEWI GmbH, Wilhelmshaven (Germany)

    2012-02-15

    One year has passed since with the disaster in Fukushima a nuclear accident has happened that, for the second time after Chernobyl, was rated level 7 according to the International Nuclear and Radiological Event Scale (INES) [1]. In response to the disaster, Germany and other industrial countries initiated a turnaround in energy policy and partly opted out of nuclear energy. Worldwide, wind energy installation figures were on the rise compared to 2010, and all in all 41,236 MW were installed in 2011. As in the previous years, the leading country is China with 18,000 MW, followed by the USA (6,810 MW) and India (3,019 MW). With new wind turbine capacity connected to the grid of 2,086 MW in 2011, Germany is in the fourth position, and when looking at the total capacity it is in the third position right after the USA and China (Tab. 1) [2]. Here in Germany meanwhile the turnaround in energy policy has been widely accepted and several federal states have issued or will issue new wind power decrees, energy concepts and development scenarios. In addition there are new priority areas for wind energy use, repowering projects and scheduled installations in the offshore area. It may take some time, however, until these measures will also have an effect on the installation figures. (orig.)

  13. DELTA-DIESEL ENGINE LIGHT TRUCK APPLICATION Contract DE-FC05-97OR22606 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hakim, Nabil Balnaves, Mike

    2003-05-27

    DELTA Diesel Engine Light Truck Application End of Contract Report DE-FC05-97-OR22606 EXECUTIVE SUMMARY This report is the final technical report of the Diesel Engine Light Truck Application (DELTA) program under contract DE-FC05-97-OR22606. During the course of this contract, Detroit Diesel Corporation analyzed, designed, tooled, developed and applied the ''Proof of Concept'' (Generation 0) 4.0L V-6 DELTA engine and designed the successor ''Production Technology Demonstration'' (Generation 1) 4.0L V-6 DELTA engine. The objectives of DELTA Program contract DE-FC05-97-OR22606 were to: Demonstrate production-viable diesel engine technologies, specifically intended for the North American LDT and SUV markets; Demonstrate emissions compliance with significant fuel economy advantages. With a clean sheet design, DDC produced the DELTA engine concept promising the following attributes: 30-50% improved fuel economy; Low cost; Good durability and reliability; Acceptable noise, vibration and harshness (NVH); State-of-the-art features; Even firing, 4 valves per cylinder; High pressure common rail fuel system; Electronically controlled; Turbocharged, intercooled, cooled EGR; Extremely low emissions via CLEAN Combustion{copyright} technology. To demonstrate the engine technology in the SUV market, DDC repowered a 1999 Dodge Durango with the DELTA Generation 0 engine. Fuel economy improvements were approximately 50% better than the gasoline engine replaced in the vehicle.

  14. Environment, economy and energy: Meeting the multiple challenges of the 1990s

    International Nuclear Information System (INIS)

    Rowe, J.W.; LaFleur, C.A.

    1992-01-01

    In the fall of 1991, New England Electric System (NEES) released its third major resource plan, 'NEESPLAN 3: Environment, Economy, and Energy in the 1990s.' In it, the Company set three major goals for the decade: (1) to reduce continuously the environmental impacts of providing electric service, including a 45% reduction in our weighted air emissions index between 1990 and 2000; (2) to maintain competitiveness by keeping price increases at or below inflation, on average, through the year 2000; and, (3) to ensure resource diversity and reliability by increasing nonutility generation, repowering existing power plants, and exploring new technologies. NEES developed these goals to provide a unified central vision for the company to respond to changing times. NEES is basing their corporate direction on their fundamental beliefs that environmental concerns are here to stay, and that these concerns must be met in tandem with cost and service challenges. By implementing NESSPLAN 3, NEES wants to demonstrate that many of the public policy goals of the environmental and regulatory communities can be better achieved by focusing on overall results rather than by litigating the details of individual power supply decisions. This article discusses the development of NEESPLAN 3, while paying particular attention to the various alternatives they examined to reach the goal of a 45% reduction in air emissions

  15. Wastes power generation introduction manual. Main edition; Haikibutsu hatsuden donyu manual. Honpen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    A practical and specific working manual was prepared that satisfies the standards and criteria defined in the relevant law such as the Sanitation and Environment Ordinance No. 249, the guideline for generation of dioxins caused by refuse disposal, and that enables the reports evaluating the wastes quantitatively to be submitted to heads of the local governments when persons in charge of planning the introduction of wastes power generation at local governments discuss the wastes power generation systems. Taking general combustible wastes and sewage sludge treatments as the object, this paper details from the economic performance to size of wastes treatment at the priority limit for the power generation facility introduction. The subject power generation systems include the following: the stoker furnace/separation type ash melting furnace power generation system, the fluidized bed/separation type ash melting furnace power generation system, and the direct type gasification melting furnace power generation system, whose establishment of safety, reliability and stability have been verified by full-size system operation record available at the local governments, the gas turbine re-powering composite type power generation system (gas turbine power plants are installed beside the incineration furnaces) that makes high-efficiency power generation possible, and the RDF power generation system (power generation by mixed combustion with general refuses, and power generation using RDF (refuse derived fuel) exclusive combustion). Other important discussion and assessment items include environment and resource utilization performances. (NEDO)

  16. ZTEK`s ultra-high efficiency fuel cell/gas turbine system for distributed generation

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, M.; Nathanson, D. [Ztek Corp., Waltham, MA (United States); Bradshaw, D.T. [Tennessee Valley Authority, Chattanooga, TN (United States)] [and others

    1996-12-31

    Ztek`s Planar Solid Oxide Fuel Cell (SOFC) system has exceptional potential for utility electric power generation because of: simplicity of components construction, capability for low cost manufacturing, efficient recovery of very high quality by-product heat (up to 1000{degrees}C), and system integration simplicity. Utility applications of the Solid Oxide Fuel Cell are varied and include distributed generation units (sub-MW to 30MW capacity), repowering existing power plants (i.e. 30MW to 100MW), and multi-megawatt central power plants. A TVA/EPRI collaboration program involved functional testing of the advanced solid oxide fuel cell stacks and design scale-up for distributed power generation applications. The emphasis is on the engineering design of the utility modules which will be the building blocks for up to megawatt scale power plants. The program has two distinctive subprograms: Verification test on a 1 kW stack and 25kW module for utility demonstration. A 1 kW Planar SOFC stack was successfully operated for 15,000 hours as of December, 1995. Ztek began work on a 25kW SOFC Power System for TVA, which plans to install the 25kW SOFC at a host site for demonstration in 1997. The 25kW module is Ztek`s intended building block for the commercial use of the Planar SOFC. Systems of up to megawatt capacity can be obtained by packaging the modules in 2-dimensional or 3-dimensional arrays.

  17. Accurate wind farm development and operation. Advanced wake modelling

    Energy Technology Data Exchange (ETDEWEB)

    Brand, A.; Bot, E.; Ozdemir, H. [ECN Unit Wind Energy, P.O. Box 1, NL 1755 ZG Petten (Netherlands); Steinfeld, G.; Drueke, S.; Schmidt, M. [ForWind, Center for Wind Energy Research, Carl von Ossietzky Universitaet Oldenburg, D-26129 Oldenburg (Germany); Mittelmeier, N. REpower Systems SE, D-22297 Hamburg (Germany))

    2013-11-15

    The ability is demonstrated to calculate wind farm wakes on the basis of ambient conditions that were calculated with an atmospheric model. Specifically, comparisons are described between predicted and observed ambient conditions, and between power predictions from three wind farm wake models and power measurements, for a single and a double wake situation. The comparisons are based on performance indicators and test criteria, with the objective to determine the percentage of predictions that fall within a given range about the observed value. The Alpha Ventus site is considered, which consists of a wind farm with the same name and the met mast FINO1. Data from the 6 REpower wind turbines and the FINO1 met mast were employed. The atmospheric model WRF predicted the ambient conditions at the location and the measurement heights of the FINO1 mast. May the predictability of the wind speed and the wind direction be reasonable if sufficiently sized tolerances are employed, it is fairly impossible to predict the ambient turbulence intensity and vertical shear. Three wind farm wake models predicted the individual turbine powers: FLaP-Jensen and FLaP-Ainslie from ForWind Oldenburg, and FarmFlow from ECN. The reliabilities of the FLaP-Ainslie and the FarmFlow wind farm wake models are of equal order, and higher than FLaP-Jensen. Any difference between the predictions from these models is most clear in the double wake situation. Here FarmFlow slightly outperforms FLaP-Ainslie.

  18. GASIFICATION PLANT COST AND PERFORMANCE OPTIMIZATION

    Energy Technology Data Exchange (ETDEWEB)

    Samuel S. Tam

    2002-05-01

    The goal of this series of design and estimating efforts was to start from the as-built design and actual operating data from the DOE sponsored Wabash River Coal Gasification Repowering Project and to develop optimized designs for several coal and petroleum coke IGCC power and coproduction projects. First, the team developed a design for a grass-roots plant equivalent to the Wabash River Coal Gasification Repowering Project to provide a starting point and a detailed mid-year 2000 cost estimate based on the actual as-built plant design and subsequent modifications (Subtask 1.1). This unoptimized plant has a thermal efficiency of 38.3% (HHV) and a mid-year 2000 EPC cost of 1,681 $/kW. This design was enlarged and modified to become a Petroleum Coke IGCC Coproduction Plant (Subtask 1.2) that produces hydrogen, industrial grade steam, and fuel gas for an adjacent Gulf Coast petroleum refinery in addition to export power. A structured Value Improving Practices (VIP) approach was applied to reduce costs and improve performance. The base case (Subtask 1.3) Optimized Petroleum Coke IGCC Coproduction Plant increased the power output by 16% and reduced the plant cost by 23%. The study looked at several options for gasifier sparing to enhance availability. Subtask 1.9 produced a detailed report on this availability analyses study. The Subtask 1.3 Next Plant, which retains the preferred spare gasification train approach, only reduced the cost by about 21%, but it has the highest availability (94.6%) and produces power at 30 $/MW-hr (at a 12% ROI). Thus, such a coke-fueled IGCC coproduction plant could fill a near term niche market. In all cases, the emissions performance of these plants is superior to the Wabash River project. Subtasks 1.5A and B developed designs for single-train coal and coke-fueled power plants. This side-by-side comparison of these plants, which contain the Subtask 1.3 VIP enhancements, showed their similarity both in design and cost (1,318 $/kW for the

  19. Factors that are influencing the economical efficiency of the CHP plants

    International Nuclear Information System (INIS)

    Ruieneanu, Liviu; Ion, Mircea

    2004-01-01

    This paper presents some factors that might influence the economical efficiency of a cogeneration plant. These factors are: the understanding of the fuel economy at consumers; - the influence of the electricity production efficiency; - the influence of exergy losses. The statistical data for different countries of Europe show that under the conditions of a deregulated liberalized market of energy the cogeneration plants have numerous financial difficulties. Even if the use of cogeneration ensures a fuel saving, if this economy it is not obvious for the consumers, those consumers might prefer for the production of heat the use of a heat only generating plant. This trend might spread rapidly if the increase of the electricity will not be present immediately in the bill of the consumers that renounce to the heat produced by the CHP plant. The method used for cost allocation on both types of energy has also a great importance, because it might facilitate the rehabilitation measures and doing so it might allow lower prices for both types of energy. Perhaps the most important factor for the economical efficiency of the plant are the exergy losses. The analysis presented above shows two things, namely: - that the electricity production has a very high price, and this cost might be lowered down by some rehabilitation measures (for example repowering); - and that the heat only plants (boilers) are not affected by the exergy losses and that's why if we analyse only the heat production, the use of cogeneration might seem inappropriate

  20. Analysis of Electrical Power Consumption in Container Crane of Container Terminal Surabaya

    Directory of Open Access Journals (Sweden)

    A.A. Masroeri

    2017-12-01

    Full Text Available Container crane electrification is a re-powering process of container cranes from diesel to electricity. In electrification process, it is required an analysis of electrical power consumption that is needed in the operational of container crane. It aims to determine whether the amount of electrical power that is supplied by PLN can be optimally used in the operational of container crane to do loading and unloading activities. To perform the analysis of electrical power consumption, it is required various data and calculations. The required data are container crane specifications and other electrical equipment specifications, the amount of electrical power that is supplied by PLN, also the single line diagram from the electrical system at the port. While, the calculations that is needed to be performed are the calculation of electrical power load in motors and other electrical equipments, the calculation of nominal current and start current, the selection of cable and busbar, and the calculation of wiring diagram junction power. From the calculations that has been done, then the next step is to do the load flow analysis simulation by using software simulation, so an accurate and effective load flow analysis can be obtained to optimize loading and unloading activities at the port. The result of this research, it can be seen that container crane electrification will give advantages in both technical and economical for the company and for the ship, such as accelerate the loading and unloading time of containers and reduce idle time, especially in the operational of diesel generator.

  1. Molten salt steam generator subsystem research experiment. Volume I. Phase 1 - Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-10-01

    A study was conducted for Phase 1 of a two-phase project whose objectives were to develop a reliable, cost-effective molten salt steam generating subsystem for solar thermal plants, minimize uncertainty in capital, operating, and maintenance costs, and demonstrate the ability of molten salt to generate high-pressure, high-temperature steam. The Phase 1 study involved the conceptual design of molten salt steam generating subsystems for a nominal 100-MWe net stand-alone solar central receiver electric generating plant, and a nominal 100-MWe net hybrid fossil-fueled electric power generating plant that is 50% repowered by a solar central receiver system. As part of Phase 1, a proposal was prepared for Phase 2, which involves the design, construction, testing and evaluation of a Subsystem Research Experiment of sufficient size to ensure successful operation of the full-size subsystem designed in Phase 1. Evaluation of several concepts resulted in the selection of a four-component (preheater, evaporator, superheater, reheater), natural circulation, vertically oriented, shell and tube (straight) heat exchanger arrangement. Thermal hydraulic analysis of the system included full and part load performance, circulation requirements, stability, and critical heat flux analysis. Flow-induced tube vibration, tube buckling, fatigue evaluation of tubesheet junctions, steady-state tubesheet analysis, and a simplified transient analysis were included in the structural analysis of the system. Operating modes and system dynamic response to load changes were identified. Auxiliary equipment, fabrication, erection, and maintenance requirements were also defined. Installed capital costs and a project schedule were prepared for each design.

  2. Development of a regional capacity expansion plan in the Russian Federation. Application of the WASP Model

    International Nuclear Information System (INIS)

    Chernilin, Yu.; Kononov, S.; Zakharova, E.; Kagramanyan, V.; Malenkov, A.

    1997-01-01

    The Wien Automatic System Planning Package (WASP) is used for the development of optimal capacity expansion plans in Russia. The object of the WASP study is the Central power pool, which is the largest power pool in Russia and has an essential share of nuclear power in electricity generation. The objective of the study is to assess the long-term competitiveness of nuclear power in the region. The major features of the power system analyzed with WASP are the following: 1) four types of electricity generators are considered: condensity fossil fuel plants, cogeneration fossil fuel plants, nuclear power plants and hydraulic plants; 2) nine fuel categories are considered: gas/fuel oil fuel, several types of coal and several nuclear fuels; 3) escalation of capital, operation and maintenance, and fuel costs as a result of economic transition is explicitly modeled. Under these assumptions, a regional optimal capacity expansion plan is developed that showed the following: (a) Until 2004 there is no need for new electricity generation capacities due to the drop in demand in the 90s, certain lifetime margin of existing capacities, committed additions of co-generators and planned refurbishment/repowering measures; (b) The structure of the optimal capacity mix confirms that nuclear power can retain its role as one of the major electricity generation sources in the region. The most important factor with a positive of effect upon the competitiveness of nuclear power plants is the projected escalation of the prices of fossil fuels; (c) The application of WASP has proved that the model can serve as a valuable planning tool at the power pool level in Russia. (author). 14 refs, 8 figs, 10 tabs

  3. Development of a regional capacity expansion plan in the Russian Federation. Application of the WASP Model

    Energy Technology Data Exchange (ETDEWEB)

    Chernilin, Yu; Kononov, S; Zakharova, E [Russian Research Inst. ` ` Kurchatov Inst.` ` , Moscow (Russian Federation); Kagramanyan, V; Malenkov, A [Institute of Physics and Power Engineering, Obninsk (Russian Federation)

    1997-09-01

    The Wien Automatic System Planning Package (WASP) is used for the development of optimal capacity expansion plans in Russia. The object of the WASP study is the Central power pool, which is the largest power pool in Russia and has an essential share of nuclear power in electricity generation. The objective of the study is to assess the long-term competitiveness of nuclear power in the region. The major features of the power system analyzed with WASP are the following: 1) four types of electricity generators are considered: condensity fossil fuel plants, cogeneration fossil fuel plants, nuclear power plants and hydraulic plants; 2) nine fuel categories are considered: gas/fuel oil fuel, several types of coal and several nuclear fuels; 3) escalation of capital, operation and maintenance, and fuel costs as a result of economic transition is explicitly modeled. Under these assumptions, a regional optimal capacity expansion plan is developed that showed the following: (a) Until 2004 there is no need for new electricity generation capacities due to the drop in demand in the 90s, certain lifetime margin of existing capacities, committed additions of co-generators and planned refurbishment/repowering measures; (b) The structure of the optimal capacity mix confirms that nuclear power can retain its role as one of the major electricity generation sources in the region. The most important factor with a positive of effect upon the competitiveness of nuclear power plants is the projected escalation of the prices of fossil fuels; (c) The application of WASP has proved that the model can serve as a valuable planning tool at the power pool level in Russia. (author). 14 refs, 8 figs, 10 tabs.

  4. A hybrid Rankine cycle (HyRC) with ambient pressure combustion (APC)

    International Nuclear Information System (INIS)

    Wu, Lijun; Thimsen, David; Clements, Bruce; Zheng, Ligang; Pomalis, Richard

    2014-01-01

    The main losses in thermal power generation include heat in exhaust flue gas, heat rejected through steam condensation of low-pressure turbine, and exergy destruction in heat exchange process etc. To the extent that the heat losses are significantly greater in temperature than either air or water coolant resources, these losses also represent exergy losses which might be exploited to improve plant capacity and efficiency. This paper presents a hybrid Rankine cycle (HyRC) with an ambient pressure combustion (APC) boiler to address the recovery potential of these losses within the steam Rankine cycle (SRC). The APC–HyRC concept employs an organic Rankine cycle (ORC) to supplement SRC and to reduce cycle energy losses to the atmosphere since organic fluids are capable of lowering cycle condensation temperature when a very low temperature heat sink is available. The case studies based on a 399 MW SRC unit show that the APC–HyRC configurations have better thermodynamic performance than its base case SRC at a cycle condensation temperature of 30 °C and below. The best APC–HyRC configuration generates up to 14% more power than the baseline steam cycle which is a 5.45% increase in overall gross efficiency with a cycle condensation temperature at 4 °C. - Highlights: • A hybrid Rankine cycle with water and organic fluid is presented. • Heat losses in exhaust flue gas and exhaust steam are reduced. • Exergy losses in regeneration process are reduced. • Efficiency improvements are made to the conventional steam Rankine cycle. • Issues in design/construction of greenfield and repowering project are discussed

  5. Understanding coal quality and its relationship to power plant performance and costs

    Energy Technology Data Exchange (ETDEWEB)

    Jennison, K.D.; Stallard, G.S. [Black & Veatch International, Overland Park, KS (United States)

    1995-12-01

    The availability of reliable, reasonably priced energy is a necessary cornerstone for established and emerging economies. In addition to addressing coal quality issues strictly at a plant level, it is now prudent to consider long-term performance and economics of particular fuel sources to be selected in the light of system economics and reliability. In order to evaluate coal quality issues in a more comprehensive manner, it is important to develop both an approach and a set of tools which can support the various phases of the planning/analysis processes. The processes must consider the following: (1) Cost/availability of other potential coal supplies, including {open_quotes}raw{close_quotes} domestic sources, {open_quotes}cleaned {close_quotes} domestic sources, and other internationally marketed coals. (2) Power plant performance issues as function of plant design and fuel properties. (3) System expansion plans, candidate technologies, and associated capital and operating costs. (4) Projected load demand, for system and for individual units within the system. (5) Legislative issues such as environmental pressures, power purchase agreements, etc. which could alter the solution. (6) Economics of potential plans/strategies based on overall cost-effectiveness of the utility system, not just individual units. (7) Anticipated unit configuration, including addition of environmental control equipment or other repowering options. The Coal Quality Impact Model (CQIM{trademark}) is a PC-based computer program capable of predicting coal-related cost and performance impacts at electric power generating sites. The CQIM was developed for EPRI by Black & Veatch and represents over a decade of effort geared toward developing an extensible state-of-the-art coal quality assessment tool. This paper will introduce CQIM, its capabilities, and its application to Eastern European coal quality assessment needs.

  6. Cost and performance of coal-based energy in Brazil

    International Nuclear Information System (INIS)

    Temchin, J.; DeLallo, M.R.

    1998-01-01

    As part of the US Department of Energy's (DOE) efforts to establish the strategic benefits of Clean Coal Technologies (CCT), there is a need to evaluate the specific market potential where coal is a viable option. One such market is Brazil, where significant growth in economic development requires innovative and reliable technologies to support the use of domestic coal. While coal is Brazil's most abundant and economic fossil energy resource, it is presently under utilized in the production of electrical power. This report presents conceptual design for pulverized coal (PC) and circulating fluidized-bed combustion (CFBC) options with resulting capital, operating and financial parameters based on Brazil application conditions. Recent PC and CFBC plant capital costs have dropped with competition in the generation market and have established a competitive position in power generation. Key issues addressed in this study include: Application of market based design approach for FBC and PC, which is competitive within the current domestic, and international power generation markets. Design, fabrication, purchase, and construction methods which reduce capital investment while maintaining equipment quality and plant availability. Impact on coast and performance from application of Brazilian coals, foreign trade and tax policies, construction logistics, and labor requirements. Nominal production values of 200 MWe and 400 MWe were selected for the CFBC power plant and 400 MWe for the PC. The 400 MWe size was chosen to be consistent with the two largest Brazilian PC units. Fluidized bed technology, with limited experience in single units over 200 MW, would consist of two 200 MWe circulating fluidized bed boilers supplying steam to one steam turbine for the 400 MWe capacity. A 200 MWe capacity unit was also developed for CFBC option to support opportunities in re-powering and where specific site or other infrastructure constraints limit production

  7. Surviving and prospering in a changing EPC business

    International Nuclear Information System (INIS)

    Walls, D.; Blazewicz, S.; Rao, N.; Little, A.D.

    1998-01-01

    Countries worldwide continue to privatize national utilities and attract foreign investment to meet growing demand for power. As a result, the global power marketplace has become highly complex, competitive, and volatile. The changes that are occurring in the electric utility industry around the world are having a dramatic impact on the way new power and T and D projects are engineered, procured, and constructed (EPC). The power EPC business faces pressures of competition and price reductions. Deregulation uncertainties and slow demand growth in the west have caused many domestic EPC firms to look internationally for new opportunities. They face many challenges, most of which relate to dealing with a much higher level of risk than they had previously been exposed to. This paper discusses some of the critical issues EPC companies are facing worldwide, how leading companies are responding to these challenges, and which strategies are likely to allow EPC companies to prosper and sustain growth in the future. Some attractive future market opportunities are highlighted. This paper concludes that EPC firms will have to develop capabilities in certain key markets, and simultaneously operate globally. EPC firms will have to develop clearer strategies to remain profitable. Either they develop scale globally through consolidation and target aggressive market shares, or develop specialized niches, especially in the technology service areas. EPCs can continue to sustain growth by leveraging in other areas of the power industry what they do best: providing technical services and building infrastructure. EPC firms can capitalize on the growing need for system-level planning and design in fuel, power, and transmission and distribution, or target higher-growth opportunities in high-value market segments such as repowering, cogeneration, and environmental systems

  8. FutureGen 2.0 Oxy-Coal Combustion Carbon Capture Plant Pre-FEED Design and Cost

    Energy Technology Data Exchange (ETDEWEB)

    Flanigan, Tom; Pybus, Craig; Roy, Sonya; Lockwood, Frederick; McDonald, Denny; Maclnnis, Jim

    2011-09-30

    This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (instead of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit

  9. Wind power: Areva acquires a 51% stake in Multibrid

    International Nuclear Information System (INIS)

    2007-01-01

    AREVA announced the acquisition of a 51% stake in Multibrid, a designer and manufacturer of multi-megawatt off-shore wind turbines based in Germany. With this acquisition, AREVA has entered into a joint venture with Prokon Nord, a German off-shore wind turbine and biomass plant developer and current owner of Multibrid. This transaction values Multibrid at euro 150 million. AREVA plans to rapidly further develop Multibrid's activities by giving the company access to its industrial resources, financial base and international commercial network. In return, Multibrid will provide AREVA with its leading-edge technology which, developed for 5 MW turbines, can achieve a very high output while reducing operating costs thanks to a simplified maintenance system. With this stake in Multibrid, AREVA aims to increase its presence on the offshore wind market that meets land settlement requirements and that should grow significantly in the years to come (from 300 MW in Europe today to an expected 1400 MW by 2011). As an exclusive supplier of Prokon Nord, Multibrid will participate in projects such as Borkum West (30 MW), the first offshore project in Germany, Borkum West 2 (400 MW), and Cote d'Albatre (105 MW), the first offshore wind farm project in France. The stake in Multibrid strengthens AREVA's strategic positioning on the CO 2 -free energy market, thanks to complementary solutions ranging from nuclear technologies to renewables. A number of recent achievements illustrate this strategy: - bio-energy (crucial energy supply in numerous rural areas): delivery of turnkey biomass power plants; ongoing construction of 10 plants in India, Thailand and Brazil; future development plans in fast-growing regions, such as Latin America; - wind power: Multibrid adds to the Group's stake in REpower and to its partnership with Suzlon for which AREVA is the number one supplier of transmission and distribution solutions for wind power; - hydrogen and fuel cells: design and manufacture of

  10. Cap-and-trade policy: The influence on investments in carbon dioxide reducing technologies in Indiana

    Science.gov (United States)

    Fahie, Monique

    With most of the energy produced in the state of Indiana coming from coal, the implementation of policy instruments such as cap-and-trade, which is included in the most recent climate bill, will have significant effects. This thesis provides an analysis of the effects that a cap-and-trade policy might have on the investment decisions for alternative technologies in the power plant sector in Indiana. Two economic models of representative coal-fired power plants, Gallagher (600MW) and Rockport (2600MW), are selected and used to evaluate the repowering decision of a plant for several technologies: integrated gasification combined cycle (IGCC), wind farm combined with natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC). The firm will make its decisions based on the net present value (NPV) of cost estimates for these CO2 reducing technologies, the cost of purchasing offsets and CO 2 allowances. This model is applied to a base case and three American Clean Energy and Security Act of 2009 cases derived from the Energy Information Administration (EIA, 2009b). A sensitivity analysis is done on the discount rate and capital costs. The results of the study indicate that a SCPC plant without carbon capture and storage (CCS) is the least costly compliance option for both plants under all of the cases while retrofitting the existing plant with CCS is the most expensive. Gallagher's three least expensive options across most scenarios were SCPC without CCS, the operation of the existing plant as is and investment in wind plus NGCC. Rockport's three least expensive compliance options across most scenarios were SCPC without CCS, the operation of the existing plant as is and IGCC without CCS. For both plants, when a 12% discount rate is utilized, NPV of costs are generally lower and the operation of the existing plant technology with the aid of allowances and offsets to be in compliance is the cheapest option. If capital costs were to decrease by 30%, a SCPC

  11. Offshore wind power resource assessment using Oceansat-2 scatterometer data at a regional scale

    International Nuclear Information System (INIS)

    Gadad, Sanjeev; Deka, Paresh Chandra

    2016-01-01

    Highlights: • Accuracy assessment of Oceansat-2 scatterometer (OSCAT) winds by the in situ real-time ship observations for study area. • OSCAT data for two years (2011 and 2012) were used to evaluate the offshore wind power potential for the Karnataka state. • Wind speed and power atlases are developed to study the spatial distribution over study area. • 9,091 MW potential was estimated using 5 MW wind turbine in the Monopile region. • Recommend development of 10% of the estimated potential, 116% of energy deficit for 2012–13 can be met. - Abstract: In the offshore region the scarcity of in situ wind data in space proves to be a major setback for wind power potential assessments. Satellite data effectively overcomes this setback by providing continuous and total spatial coverage. The study intends to assess the offshore wind power resource of the Karnataka state, which is located on the west coast of India. Oceansat-2 scatterometer (OSCAT) wind data and GIS based methodology were adopted in the study. The OSCAT data accuracy was assessed using INCOIS Realtime All Weather Station (IRAWS) data. Wind speed maps at 10 m, 90 m and wind power density maps using OSCAT data were developed to understand the spatial distribution of winds over the study area. Bathymetric map was developed based on the available foundation types and demarking various exclusion zones to help in minimizing conflicts. The wind power generation capacity estimation performed using REpower 5 MW turbine, based on the water depth classes was found to be 9,091 MW in Monopile (0–35 m), 11,709 MW in Jacket (35–50 m), 23,689 MW in Advanced Jacket (50–100 m) and 117,681 MW in Floating (100–1000 m) foundation technology. In Indian scenario major thrust for wind farm development in Monopile region is required. Therefore as first phase of development, if 10% of the estimated potential in the region can be developed then, 116% of energy deficit for FY 2011–12 could be met. Also, up to 79

  12. High performance integrated solar combined cycles with minimum modifications to the combined cycle power plant design

    International Nuclear Information System (INIS)

    Manente, Giovanni

    2016-01-01

    Highlights: • Off-design model of a 390 MW_e three pressure combined cycle developed and validated. • The off-design model is used to evaluate different hybridization schemes with solar. • Power boosting and fuel saving with different design modifications are considered. • Maximum solar share of total electricity is only 1% with the existing equipment. • The maximum incremental solar radiation-to-electrical efficiency approaches 29%. - Abstract: The integration of solar energy into natural gas combined cycles has been successfully demonstrated in several integrated solar combined cycles since the beginning of this decade in many countries. There are many motivations that drive investments on integrated solar combined cycles which are primarily the repowering of existing power plants, the compliance with more severe environmental laws on emissions and the mitigation of risks associated with large solar projects. Integrated solar combined cycles are usually developed as brownfield facilities by retrofitting existing natural gas combined cycles and keeping the existing equipment to minimize costs. In this work a detailed off-design model of a 390 MW_e three pressure level natural gas combined cycle is built to evaluate different integration schemes of solar energy which either keep the equipment of the combined cycle unchanged or include new equipment (steam turbine, heat recovery steam generator). Both power boosting and fuel saving operation strategies are analyzed in the search for the highest annual efficiency and solar share. Results show that the maximum incremental power output from solar at design solar irradiance is limited to 19 MW_e without modifications to the existing equipment. Higher values are attainable only including a larger steam turbine. High solar radiation-to-electrical efficiencies in the range 24–29% can be achieved in the integrated solar combined cycle depending on solar share and extension of tube banks in the heat recovery

  13. Prefeasibility of the project for repowering the Nachi Cocom thermal station in Merida, Yucatan state; Prefactibilidad del proyecto de repotenciacion de la central termoelectrica de Nachi- Cocom, en Merida estado de Yucatan

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Perez, J.L. [Comision Federal de Electricidad (CFE) (Mexico)

    1995-12-31

    This paper presents an alternative to the solution of the more efficient use of energy and for the solution on environmental pollution at a reduced cost, satisfying the electric energy demand with additional capacity three times as much greater than the installed capacity and utilizing evaluation of projects techniques for the prefeasibility analysis of the project. The investment for this type of projects results are feasible and attractive because of the short amortization term. The summary of results is given in Table 4. [Espanol] El presenta trabajo da una alternativa de solucion al uso mas eficiente de la energia y solucion a los problemas de contaminacion ambiental a un costo reducido, satisfaciendo la demanda de energia electrica con capacidad adicional de tres veces mayor a la capacidad instalada. Empleando tecnicas de evaluacion de proyectos para analisis de la prefactibilidad del proyecto. La inversion para este tipo de proyectos resulta factible y atractiva por el corto tiempo de amortizacion. El resumen de los resultados se muestra en la tabla 4.

  14. Prefeasibility of the project for repowering the Nachi Cocom thermal station in Merida, Yucatan state; Prefactibilidad del proyecto de repotenciacion de la central termoelectrica de Nachi- Cocom, en Merida estado de Yucatan

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Perez, J L [Comision Federal de Electricidad (CFE) (Mexico)

    1996-12-31

    This paper presents an alternative to the solution of the more efficient use of energy and for the solution on environmental pollution at a reduced cost, satisfying the electric energy demand with additional capacity three times as much greater than the installed capacity and utilizing evaluation of projects techniques for the prefeasibility analysis of the project. The investment for this type of projects results are feasible and attractive because of the short amortization term. The summary of results is given in Table 4. [Espanol] El presenta trabajo da una alternativa de solucion al uso mas eficiente de la energia y solucion a los problemas de contaminacion ambiental a un costo reducido, satisfaciendo la demanda de energia electrica con capacidad adicional de tres veces mayor a la capacidad instalada. Empleando tecnicas de evaluacion de proyectos para analisis de la prefactibilidad del proyecto. La inversion para este tipo de proyectos resulta factible y atractiva por el corto tiempo de amortizacion. El resumen de los resultados se muestra en la tabla 4.

  15. A novel approach for treatment of CO{sub 2} from fossil fired power plants, Part A: The integrated systems ITRPP

    Energy Technology Data Exchange (ETDEWEB)

    Minutillo, M.; Perna, A. [Department of Industrial Engineering, University of Cassino, Via G. di Biasio, 43, 03043 Cassino, Frosinone (Italy)

    2009-05-15

    repowering of the base power plants (steam turbine power plant and gas turbine combine cycle) is very high because of the large amount of steam produced in the tri-reforming island (in the ITRPP-SC is about of 64%, while in the ITRPP-CC is about of 105%). The reduction in the CO{sub 2} emissions has been estimated in 83% (15.4 vs. 93.4 kg/GJ{sub Fuelinput}) and 84% (8.9 vs. 56.2 kg/GJ{sub Fuelinput}) for the ITRPP-SC and ITRPP-CC respectively. (author)

  16. Hybrid Combined Cycles with Biomass and Waste Fired Bottoming Cycle - a Literature Study

    Energy Technology Data Exchange (ETDEWEB)

    Petrov, Miroslav P.

    2002-02-01

    Biomass is one of the main natural resources in Sweden. The present low-CO{sub 2} emission characteristics of the Swedish electricity production system (hydro and nuclear) can be retained only by expansion of biofuel applications for energy purposes. Domestic Swedish biomass resources are vast and renewable, but not infinite. They must be utilized as efficiently as possible, in order to make sure that they meet the conditions for sustainability in the future. Application of efficient power generation cycles at low costs is essential for meeting this challenge. This applies also to municipal solid waste incineration with energy extraction, which should be preferred to its dumping in landfills. Hybrid dual-fuel combined cycle units are a simple and affordable way to increase the electric efficiency of biofuel energy utilization, without big investments, uncertainties or loss of reliability arising from complicated technologies. Configurations of such power cycles are very flexible and reliable. Their potential for high electric efficiency in condensing mode, high total efficiency in combined heat and power mode and unrivalled load flexibility is explored in this project. The present report is a literature study that concentrates on certain biomass utilization technologies, in particular the design and performance of hybrid combined cycle power units of various configurations, with gas turbines and internal combustion engines as topping cycles. An overview of published literature and general development trends on the relevant topic is presented. The study is extended to encompass a short overview of biomass utilization as an energy source (focusing on Sweden), history of combined cycles development with reference especially to combined cycles with supplementary firing and coal-fired hybrid combined cycles, repowering of old steam units into hybrid ones and combined cycles for internal combustion engines. The hybrid combined cycle concept for municipal solid waste

  17. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    for dry-fed gasifier configuration • Full capital cost report and cost category analysis (CAPEX) • Full operating cost report and assumptions (OPEX) Comparative technology evaluations, value engineering exercises, and initial air permitting activities are also provided; the report concludes with schedule, risk, and cost mitigation activities as well as lessons learned such that the products of this report can be used to support future investments in utility scale gasification and carbon capture and sequestration. Collectively, the FutureGen project enabled the comprehensive site specific evaluation and determination of the economic viability of IGCC-CCS. The project report is bound at that determination when DOE formally proposed the FutureGen 2.0 project which focuses on repowering a pulverized coal power plant with oxy-combustion technology including CCS.

  18. International wind energy development. World market update 2001. Forecast 2002-2006

    International Nuclear Information System (INIS)

    2002-03-01

    In the year 2001, the wind power development took another major step forward. Installed capacity set a new record with the addition of 6,824 MW of new generating capacity. This is 2,329 MW more than the record set in year 2000. Growth in new capacity is up from 15% in year 2000 to 52% in 2001. This confirmed that the trend of wind energy being the preferred technology over other technologies for new generating capacity is continuing. Europe is the leading region for wind power. Of the new capacity added in 2001, 4,527 MW was installed in Europe. Germany once more shows this country's potential as the single most active market with the installation of 2,627 MW in new capacity, nearly 1,000 MW more than in the previous year. Germany consolidated its position as the world's leading developer of wind energy. The market in the US is once again the second largest wind energy market ahead of Spain. The expiration of the PTC at the end of the year 2001 gave some rush in the installation at the end of the year. The Danish market is on a deroute and lost pace completely in a changed political climate which means that the development of windpower is slowing down. Denmark has a very high penetration of windpower. On the supplier side Vestas Wind Systems A/S maintained its position as being the world's largest manufacturer of wind turbines. Vestas Wind Systems is now followed by Enercon GmbH. Without counting the US market figures Vestas Wind Systems A/S and Enercon has become the very closed in terms of sold MW. In the 3rd place is the Danish company NEG Micon A/S. Newcomers in the Top Ten list are Mitsubishi (JP) and REpower (GE). The most significant technological trend in the market is the continuing upscaling of machines. From year 2001 the average size of WTGs is 915 kW (in 2000: 800kW). In the very near future there will be erected wind turbines mainly dedicated for the upcoming offshore market of 4.5-5.0 MW. On Offshore there is only 10 MW installed during the year 2001

  19. Best Practices for Siting Solar Photovoltaics on Municipal Solid Waste Landfills. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, K.; Mosey, G.; Jones-Johnson, S.; Dufficy, C.; Bourg, J.; Conroy, A.; Keenan, M.; Michaud, W.; Brown, K.

    2013-04-01

    The Environmental Protection Agency and the National Renewable Energy Laboratory developed this best practices document to address common technical challenges for siting solar photovoltaics (PV) on municipal solid waste (MSW) landfills. The purpose of this document is to promote the use of MSW landfills for solar energy systems. Closed landfills and portions of active landfills with closed cells represent thousands of acres of property that may be suitable for siting solar photovoltaics (PV). These closed landfills may be suitable for near-term construction, making these sites strong candidate to take advantage of the 30% Federal Business Energy Investment Tax Credit. It was prepared in response to the increasing interest in siting renewable energy on landfills from solar developers; landfill owners; and federal, state, and local governments. It contains examples of solar PV projects on landfills and technical considerations and best practices that were gathered from examining the implementation of several of these projects.

  20. NEXT GENERATION TURBINE PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    William H. Day

    2002-05-03

    could supply both heat and peaking power (Block 2 engine); (2) Repowering of an older coal-fired plant (Block 2 engine); (3) Gas-fired HAT cycle (Block 1 and 2 engines); (4) Integrated gasification HAT (Block 1 and 2 engines). Also under Phase I of the NGT Program, a conceptual design of the combustion system has been completed. An integrated approach to cycle optimization for improved combustor turndown capability has been employed. The configuration selected has the potential for achieving single digit NO{sub x}/CO emissions between 40 percent and 100 percent load conditions. A technology maturation plan for the combustion system has been proposed. Also, as a result of Phase I, ceramic vane technology will be incorporated into NGT designs and will require less cooling flow than conventional metallic vanes, thereby improving engine efficiency. A common 50 Hz and 60 Hz power turbine was selected due to the cost savings from eliminating a gearbox. A list of ceramic vane technologies has been identified for which the funding comes from DOE, NASA, the U.S. Air Force, and P&W.

  1. Smooth feeding-in of wind energy via hydrogen

    International Nuclear Information System (INIS)

    Lehmann, J.; Sponholz, C.; Luschtinetz, O.U.T.; Miege, A.; Sandlass, H.

    2006-01-01

    For the northern part of Germany the harvest of wind energy became characteristic. 1,018 GW have been installed by 2004. A higher electricity production with re-powered wind parks on shore and new off shore parks is planned. The estimated production could reach 50 GW by 2020. On the other hand, more than 20 30 % discontinuous electricity related to the demand could bring instabilities of the net. Unfortunately the demand in North-Germany is a relatively small one and the net is weak. There are three possibilities to protect the net: 1. Reconstruction of the net, especially net extension 2. Improvement of the prognosis of wind and electricity consumption as well 3. A net management, which shuts up wind parks during less demand periods Point 2 and 3 are related with the stand by of back-up power, power delivered by conventional power stations or storage power stations (for example storage by water pumping). The proposal is as follows: Wind parks should be connected with a loop from electrolysis, gas storage and reconversion of hydrogen into electricity. In this way a park will be able to feed electricity into the net according to the actual demand and controlled by the demand. Going into detail a wind farm can run according to four scenarios. The first one is the conventional wind park, which causes the problems mentioned above. The electrical energy output follows the natural wind yield and the grid has to be adapted to the wind power feed-in. One solution for a temporal decoupling of wind yield and electricity output is a combination of windmills with a storage loop as shown in scenario II and IV. The system of scenario II de-couples the fluctuating input (wind) and the constant output (electricity). The advantage of this system is that the electrical output is constant and independent of the actual wind speed. For this reason this wind park acts as a constant power plant within the grid. Scenario Ill, the grid adapted feed-in, extends the former scenario with a

  2. Real Time Flame Monitoring of Gasifier and Injectors

    Energy Technology Data Exchange (ETDEWEB)

    Zelepouga, Serguei; Saveliev, Alexei

    2011-12-31

    This project is a multistage effort with the final goal to develop a practical and reliable nonintrusive gasifier injector monitor to assess burner wear and need for replacement. The project team included the National Energy Technology Laboratory (NETL), Gas Technology Institute (GTI), North Carolina State University, and ConocoPhillips. This report presents the results of the sensor development and testing initially at GTI combustion laboratory with natural gas flames, then at the Canada Energy Technology Center (CANMET), Canada in the atmospheric coal combustor as well as in the pilot scale pressurized entrained flow gasifier, and finally the sensor capabilities were demonstrated at the Pratt and Whitney Rocketdyne (PWR) Gasifier and the Wabash River Repowering plant located in West Terre Haute, IN. The initial tests demonstrated that GTI gasifier sensor technology was capable of detecting shape and rich/lean properties of natural gas air/oxygen enriched air flames. The following testing at the Vertical Combustor Research Facility (VCRF) was a logical transition step from the atmospheric natural gas flames to pressurized coal gasification environment. The results of testing with atmospheric coal flames showed that light emitted by excited OH* and CH* radicals in coal/air flames can be detected and quantified. The maximum emission intensities of OH*, CH*, and black body (char combustion) occur at different axial positions along the flame length. Therefore, the excitation rates of CH* and OH* are distinct at different stages of coal combustion and can be utilized to identify and characterize processes which occur during coal combustion such as devolatilization, char heating and burning. To accomplish the goals set for Tasks 4 and 5, GTI utilized the CANMET Pressurized Entrained Flow Gasifier (PEFG). The testing parameters of the PEFG were selected to simulate optimum gasifier operation as well as gasifier conditions normally resulting from improper operation or

  3. 18{sup th} bioenergy symposium. Solid fuels, biofuels, biogas; 18. Symposium Bioenergie. Festbrennstoffe, Biokraftstoffe, Biogas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    ) Applied concepts of processing fermentation residues: Evaluation, comparison as well as material flows and nutrient flows (R. Kirchmayr); (20) Climate protection and lifestyle (P. Weish); (21) Exploration of new fuels for small power ranges by means of vortex firing (E. Hamatschek); (22) The biomass gasification project BLAUER TURM H2Herten (E. Greiler); (23) Success factors for bio energy plants with a local district heating network using evaluated biomass heating plants as an example (C. Leuchtweis); (24) Climate protection program Eco Plus: Reduction of CO{sub 2} emissions - Generation of yields (S. Sanders); (25) Significance of bio energy for an ecologic model district (T. Jenssen); (26) State of the art and perspectives of flexi-fuel vehicles (U. Kramer); (27) Biofuels - Challenges for the engines from tomorrow (B. Gehringer); (28) In-situ variable ethanol-diesel blends for the improvement of the emissions at serial diesel motors (W. Kangler); (29) Aftertreatment of exhaust gases by means of rapeseed fuels in diesel engines (V. Wichmann); (30) Towards the industrial production (O. Schulze); (31) State of the art of the realization of the bioliq procedure (E. Dinjus); (32) Biogas distribution systems as an economic alternative to the utilization of biogas (W. Urban); (33) Feed-in of biogas into the natural gas distribution system: Newest developments of the market in the area of biogas conditioning in Germany and Europe (S. Rostek); (34) Repowering of biogas plants - From sub-standard to the engine for progress (M. Paproth); (35) Biogas production in Switzerland: State of the art, organisation of the branche and economic efficiency (A. Maerki); (36) Ecobalance biogas - Success factors for the sustainable utilization of the biogas technology by means of selected biogas plants as an example (J. Pucker); (37) What role does the bio energy play in the sustainable energy supply? Bio energy in the context to climatic change, energy systems and utilization of land - Results

  4. Generalized conventional and intelligent supervisory control system for combined cycle generation power plants; Sistema de control supervisorio generalizado convencional e inteligente para centrales de generacion de ciclo combinado

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Morales, Miguel Angel

    2004-12-15

    (conventional or intelligent) is possible to get more power generation than if we use the automatic methods based on feedback MW control. Consequently, the financial benefit due to the MW generated along a period of 2 months, is equivalent to return the investment required if the CCPP would had been repowered. Test also showed that with the fuzzy based SGC is possible to get a 'little more' power generation than if we use the PID based SGC. The development and implementation of the SGC was made in three phases: First Phase: Upgrading of the simulation dynamic mathematical model and implementation in a new software platform based on LabWindows/CVI. Second Phase: Design, implementation and testing of the PID based SGC. Third Phase: Design and implementation and testing of the Intelligent SGC, based in fuzzy logic. [Spanish] El programa de obras de generacion de la Comision Federal de Electricidad (CFE) del ano 2004 al ano 2008 esta caracterizado por el dominio del proceso de ciclo combinado para la expansion de generacion de energia en Mexico [CFE, 2000]. De acuerdo con los datos presentados por esta fuente, el incremento estimado en la capacidad de generacion de potencia electrica es de 12876 MW, de los cuales las centrales de ciclo combinado aportaran 10655 MW, lo que representa el 82.75%. Bajo estas expectativas de expansion de generacion de energia en Mexico, en este trabajo de tesis se desarrollo un sistema de control supervisorio generalizado (CSG) convencional (PID) e inteligente (logica difusa) para una central de generacion de ciclo combinado, el cual permite lograr la operacion optima de la planta a traves del arranque automatico de las unidades generadoras y obtener la maxima cantidad posible de potencia electrica en forma automatica y segura. Para el desarrollo del CSG se implanto un lazo de control por temperatura para el sistema de turbina de gas (TG) y un lazo de control por presion estrangulada para la turbina de vapor (TV). El diseno de estos sistemas

  5. Integration of bio-fired gas turbines in combined heat and power generation; Integrering av biogaseldad gasturbin i kraftvaermeanlaeggning

    Energy Technology Data Exchange (ETDEWEB)

    Genrup, Magnus; Jonshagen, Klas

    2011-01-15

    The aim of the project was to perform a pre-study of the potential to introduce a biofired gas turbine into the pre-heater train of a district heating plant. The incentive for the work is the desire (and political drivers) to increase bio-fuel usage in heat and power production. Sweden has also ratified the EU treaty of having 20 percent renewable in the system before 2020. There are several options at the hand but locally produced biofuels from either gasification or biological processes can be fired in a gas turbine. The size of the gas turbine is limited by shear size of the fuel plant and raw-material transport issues. Today, the maximum electrical efficiency for large-scale advanced plants is on the order of 60 percent. This level is, however, not feasible for smaller size units and one can expect much lower levels. Another possibility is to re-power an existing plant and use the exhaust heat from the gas turbine. Either to produce steam in a heat recovery steam generator, heat boiler combustion air (and variants) or to reduce pre-heater extraction through by-passing the pre-heaters. Previous studies have shown that one could expect very high efficiency levels if the heat could be utilized in the feed water to the boiler. This is typically coupled to the admission pressure level and super-critical plant may have feed water temperature exceeding 300 deg C. The aim of this project was to investigate the potential from introducing this technology into a certain typical Swedish/Nordic turbine based district heating plant. A typical plant has modest admission data (compared to an ultra super-critical plant), hence lower final feed water temperature. A lower final temperature makes it more troublesome to effectively use the exhaust heat from the gas turbine. A further improvement is possible by introducing reheat. There are several practical limitations, where the most severe is the need to extract the full turbine flow and induce it after the reheater. The only