WorldWideScience

Sample records for replaces omitted part

  1. Geometrical Meaning of Arithmetic Series [Image Omitted], [Image Omitted] and [Image Omitted] in Terms of the Elementary Combinatorics

    Science.gov (United States)

    Kobayashi, Yukio

    2011-01-01

    The formula [image omitted] is closely related to combinatorics through an elementary geometric exercise. This approach can be expanded to the formulas [image omitted], [image omitted] and [image omitted]. These formulas are also nice examples of showing two approaches, one algebraic and one combinatoric, to a problem of counting. (Contains 6…

  2. 49 CFR 541.6 - Requirements for replacement parts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Requirements for replacement parts. 541.6 Section....6 Requirements for replacement parts. (a) Each replacement part for a part specified in § 541.5(a) must have the registered trademark of the manufacturer of the replacement part, or some other unique...

  3. 30 CFR 57.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 57.19122 Section 57.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 57.19122 Replacement parts. Parts used to repair hoists shall have properties...

  4. 30 CFR 56.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 56.19122 Section 56.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 56.19122 Replacement parts. Parts used to repair hoists shall have properties...

  5. Opportunistic replacement of fusion power system parts

    International Nuclear Information System (INIS)

    Day, J.A.; George, L.L.

    1981-01-01

    This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits

  6. Iterative-build OMIT maps: map improvement by iterative model building and refinement without model bias

    International Nuclear Information System (INIS)

    Terwilliger, Thomas C.; Grosse-Kunstleve, Ralf W.; Afonine, Pavel V.; Moriarty, Nigel W.; Adams, Paul D.; Read, Randy J.; Zwart, Peter H.; Hung, Li-Wei

    2008-01-01

    An OMIT procedure is presented that has the benefits of iterative model building density modification and refinement yet is essentially unbiased by the atomic model that is built. A procedure for carrying out iterative model building, density modification and refinement is presented in which the density in an OMIT region is essentially unbiased by an atomic model. Density from a set of overlapping OMIT regions can be combined to create a composite ‘iterative-build’ OMIT map that is everywhere unbiased by an atomic model but also everywhere benefiting from the model-based information present elsewhere in the unit cell. The procedure may have applications in the validation of specific features in atomic models as well as in overall model validation. The procedure is demonstrated with a molecular-replacement structure and with an experimentally phased structure and a variation on the method is demonstrated by removing model bias from a structure from the Protein Data Bank

  7. Strategic provisioning of replacement parts for CANDU power plants

    International Nuclear Information System (INIS)

    Mizuno, G.; Tume, P.; Prentice, J.

    2000-01-01

    Provisioning of replacement parts and management of critical spares are key factors in optimizing maintenance programs for CANDU power plants. With a view to supply assurance, Atomic Energy Canada Limited (AECL) has created a Spare Parts Branch (SPB) to provide a clear pipeline from the client to the delivered replacement part(s). SPB provides the client with assured access to a qualified supplier database, computer aided design, engineering and manufacturing services and material upgrades and design registration through the authorized inspection agency. The AECL spare parts strategic provisioning service plan that has four thrusts: 1) the efficient delivery of cost-effective replacement parts; 2) obsolete parts resolution; 3) a website that will provide our clients with real-time access to replacement part data; and 4) inventory recovery opportunities. Thrusts one and two are actively ensuring plant maintenance for on-shore and off-shore CANDU clients. Thrusts three and four are longer-term commitments. This paper will explore these thrusts in the context of our CANDU business practices. (author)

  8. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS LICENSE EXCEPTIONS § 740.10 Servicing and replacement of parts and equipment (RPL). This License... replacement of equipment. (a) Parts—(1) Scope. The provisions of this paragraph (a) authorize the export and reexport of one-for-one replacement parts for previously exported equipment. (2) One-for-one replacement of...

  9. Dual Systems Competence [Image Omitted] Procedural Processing: A Relational Developmental Systems Approach to Reasoning

    Science.gov (United States)

    Ricco, Robert B.; Overton, Willis F.

    2011-01-01

    Many current psychological models of reasoning minimize the role of deductive processes in human thought. In the present paper, we argue that deduction is an important part of ordinary cognition and we propose that a dual systems Competence [image omitted] Procedural processing model conceptualized within relational developmental systems theory…

  10. Software for handling and replacement of missing data

    Directory of Open Access Journals (Sweden)

    Mayer, Benjamin

    2009-10-01

    Full Text Available In medical research missing values often arise in the course of a data analysis. This fact constitutes a problem for different reasons, so e.g. standard methods for analyzing data lead to biased estimates and a loss of statistical power due to missing values, since those methods require complete data sets and therefore omit incomplete cases for the analyses. Furthermore missing values imply a certain loss of information for what reason the validity of results of a study with missing values has to be rated less than in a case where all data had been available. For years there are methods for replacement of missing values (Rubin, Schafer to tackle these problems and solve them in parts. Hence in this article we want to present the existing software to handle and replace missing values on the one hand and give an outline about the available options to get information on the other hand. The methodological aspects of the replacement strategies are delineated just briefly in this article.

  11. REPLACEMENT SPARE PART INVENTORY MONITORING USING ADAPTIVE NEURO FUZZY INFERENCE SYSTEM

    Directory of Open Access Journals (Sweden)

    Hartono Hartono

    2016-01-01

    Full Text Available Abstract   The amount of inventory is determined on the basis of the demand. So that users can know the demand forecasts need to be done on the request. This study uses the data to implement a replacement parts on the electronic module production equipment in the telecommunications transmission systems, switching, access and power, ie by replacing the electronic module in the system is trouble  or damaged parts of a good electronic module spare parts inventory, while the faulty electronic modules shipped to the Repair Center for repaired again, so that the results of these improvements can replenish spare part  inventory. Parameters speed on improvement process of electronic module broken (repaired, in the form of an average repair time at the repair centers, in order to get back into the electronic module that is ready for used as spare parts in compliance with the safe supply inventory  warehouse.  This research using the method  of  Adaptive Neuro Fuzzy Inference System (ANFIS in developing a decision support system for inventory control of spare parts available in Warehouse Inventory taking into account several parameters supporters, namely demand, improvement and fulfillment of spare parts and repair time. This study uses a recycling input parameter repair faulty electronic module of the customer to immediately replace the module in inventory warehouse,  do improvements in the Repair Center. So the acceleration restoration factor is very influential as the input spare parts inventory supply in the warehouse and using the Adaptive Neuro-Fuzzy Inference System (ANFIS method.   Keywords: ANFIS, inventory control, replacement

  12. Controlling the quality of replacement parts in nuclear station, class 1E equipment

    International Nuclear Information System (INIS)

    Pierson, R.K.; Clemons, R.W.

    1984-01-01

    Nuclear station owners have traditionally purchased replacement parts for Class 1E equipment from the original supplier of the equipment. By this method, part and equipment quality could be maintained. In recent years, however, this traditional source of parts has continuously declined as an increasing number of original equipment suppliers stop producing Class 1E equipment or no longer stock parts for older equipment. When replacement parts for Class 1E equipment are not obtainable from the original suppliers, equipment owners have created a variety of methods for assuring the quality of parts obtained from other sources. A standard that provides direction and guidance for maintaining the quality of Class 1E equipment when repaired with parts from alternate sources is, therefore, needed to assure the methods in use are satisfactory and to alert the equipment owners to additional acceptable methods. The standard has now been proposed. IEEE Standard P934 (June, 1983 Draft): ''Requirements for Replacement Parts for Class 1E Equipment in Nuclear Power Generating Stations'' (Ref-3) consist of an introductory section followed by sections on part selection, procurement, replacement (including inspections and tests), non-conforming conditions and records. The proposed standard also includes a non-mandatory appendix on acceptable procurement methods and a summary intended to assist the user in selecting a proper procurement method

  13. Solving the Omitted Variables Problem of Regression Analysis Using the Relative Vertical Position of Observations

    Directory of Open Access Journals (Sweden)

    Jonathan E. Leightner

    2012-01-01

    Full Text Available The omitted variables problem is one of regression analysis’ most serious problems. The standard approach to the omitted variables problem is to find instruments, or proxies, for the omitted variables, but this approach makes strong assumptions that are rarely met in practice. This paper introduces best projection reiterative truncated projected least squares (BP-RTPLS, the third generation of a technique that solves the omitted variables problem without using proxies or instruments. This paper presents a theoretical argument that BP-RTPLS produces unbiased reduced form estimates when there are omitted variables. This paper also provides simulation evidence that shows OLS produces between 250% and 2450% more errors than BP-RTPLS when there are omitted variables and when measurement and round-off error is 1 percent or less. In an example, the government spending multiplier, , is estimated using annual data for the USA between 1929 and 2010.

  14. Replacement of steel parts with extruded aluminum alloys in an automobile

    Science.gov (United States)

    Daggula, Manikantha Reddy

    Over the past years, vehicle emissions have shown a negative impact on environment and human health. A new strategy has been used by automakers to reduce a vehicle's weight which significantly reduce fuel consumption and C02 emissions. A very light car consumes very less fuel as it needs to overcome less inertia, decreasing the required power to movie the vehicle. Reducing weight is the easiest way to increase fuel economy and making it by just 10% can increase its efficiency 6 to 8 percent. For a normal scale 80% of vehicles weight is shared among chassis, power train and other exterior components. Almost 60% of the vehicles weight is comprised of steel and the remaining is with cast and extruded aluminum and magnesium alloys. Our main aim is to look for the parts like Fuel tank holder, Fuel filler neck, Turbo inlet assembly, and Brake lines, Dash board frame which are made from steel and replace them with extruded aluminum alloys, to analyze a conventional rear wheel aluminum drive shaft and replace it with a new design and with a new aluminum alloy. The current project involves dismantling an automobile and looking for feasible steel parts and making samples, analyzing the hardness of the samples. These parts are optimally analyzed using Ansys Finite element analysis tool, these parts are subjected to the constraints such as three-point bending, tensile testing, hydrostatic pressure and also torsional stress action on the drive shaft, the deformation and stress are observed in these parts. The results show the current steel parts can be replaced with 3000 series aluminum alloy and the drive shaft can be replaced with new design with 6061-T6 Al-alloy which decreases 25% of the shaft weight.

  15. Replaceable Substructures for Efficient Part-Based Modeling

    KAUST Repository

    Liu, Han; Vimont, Ulysse; Wand, Michael; Cani, Marie Paule; Hahmann, Stefanie; Rohmer, Damien; Mitra, Niloy J.

    2015-01-01

    A popular mode of shape synthesis involves mixing and matching parts from different objects to form a coherent whole. The key challenge is to efficiently synthesize shape variations that are plausible, both locally and globally. A major obstacle is to assemble the objects with local consistency, i.e., all the connections between parts are valid with no dangling open connections. The combinatorial complexity of this problem limits existing methods in geometric and/or topological variations of the synthesized models. In this work, we introduce replaceable substructures as arrangements of parts that can be interchanged while ensuring boundary consistency. The consistency information is extracted from part labels and connections in the original source models. We present a polynomial time algorithm that discovers such substructures by working on a dual of the original shape graph that encodes inter-part connectivity. We demonstrate the algorithm on a range of test examples producing plausible shape variations, both from a geometric and from a topological viewpoint. © 2015 The Author(s) Computer Graphics Forum © 2015 The Eurographics Association and John Wiley & Sons Ltd. Published by John Wiley & Sons Ltd.

  16. Replaceable Substructures for Efficient Part-Based Modeling

    KAUST Repository

    Liu, Han

    2015-05-01

    A popular mode of shape synthesis involves mixing and matching parts from different objects to form a coherent whole. The key challenge is to efficiently synthesize shape variations that are plausible, both locally and globally. A major obstacle is to assemble the objects with local consistency, i.e., all the connections between parts are valid with no dangling open connections. The combinatorial complexity of this problem limits existing methods in geometric and/or topological variations of the synthesized models. In this work, we introduce replaceable substructures as arrangements of parts that can be interchanged while ensuring boundary consistency. The consistency information is extracted from part labels and connections in the original source models. We present a polynomial time algorithm that discovers such substructures by working on a dual of the original shape graph that encodes inter-part connectivity. We demonstrate the algorithm on a range of test examples producing plausible shape variations, both from a geometric and from a topological viewpoint. © 2015 The Author(s) Computer Graphics Forum © 2015 The Eurographics Association and John Wiley & Sons Ltd. Published by John Wiley & Sons Ltd.

  17. A new approach of the design process for replacing wooden parts of furniture

    Directory of Open Access Journals (Sweden)

    Ciupan Cornel

    2017-01-01

    Full Text Available Based on different design processes for innovative products, the paper presents a new approach of the process. The new method studies the problem of replacing the wooden components of the resistance structure of furniture with other materials. This is a reverse engineering process, that starts with the entire component, following a series of steps to the part drawings, ready for manufacturing. The method was validated by redesigning some parts of the upholstered products manufactured by TAPARO Company, by replacing the wooden parts of the resistance structure of sofas with composite material.

  18. Self-administered semiquantitative food frequency questionnaires: patterns, predictors, and interpretation of omitted items

    Science.gov (United States)

    Michels, Karin B.; Willett, Walter C.

    2013-01-01

    Background Food items on a self-administered food frequency questionnaire (FFQ) may be left blank because the food was not consumed, because of difficulties remembering the frequency or amount of intake, or due to an oversight. Methods We explored the predictors and frequency of consumption of omitted food items on an FFQ used in the Nurses’ Health Study II. Of 87,676 women who returned a mailed 147-item FFQ in 1999, 34% completed the entire questionnaire, whereas 66% left at least 1 food item blank. Ten or more foods were omitted by 5% of participants. Foods were more likely omitted by women who were older, more physically active, and had more children. We resurveyed 2876 participants who had left between 1 and 70 food items blank and asked them to fill in the blanks. Overall, 2485 participants provided complete responses. Results In the resurvey, 64% of the formerly omitted foods were marked as consumed never or less than once per month, 20% as 1–3 times per month, 8% as once per week, and 9% as more than once per week. Commonly consumed foods and beverages were less likely omitted because they were not consumed than rarely consumed foods. The best estimate for the true intake value of an omitted food was 0.82 times the average population intake. Conclusions When calculating nutrient intake, the assumption that items missing represent zero intake is reasonable. However, foods consumed more often in the population at large are less likely than rarely consumed foods to be left blank because they were not consumed. PMID:19106799

  19. A Note on Omitting Types in Propositional Logic

    Directory of Open Access Journals (Sweden)

    Oren Kolman

    2015-05-01

    Full Text Available Analogues of the classical omitting types theorems of first-order logic are proved for propositional logic. For an infinite cardinal $\\kappa$, a sufficient criterion is given for the omission of $\\kappa$-many types in a propositional language with $\\kappa$ propositional variables.

  20. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  1. Social network based dynamic transit service through the OMITS system.

    Science.gov (United States)

    2014-02-01

    The Open Mode Integrated Transportation System (OMITS) forms a sustainable information infrastructure for communication within and between the mobile/Internet network, the roadway : network, and the users social network. It manipulates the speed g...

  2. Hip joint replacement

    Science.gov (United States)

    Hip arthroplasty; Total hip replacement; Hip hemiarthroplasty; Arthritis - hip replacement; Osteoarthritis - hip replacement ... Your hip joint is made up of 2 major parts. One or both parts may be replaced during surgery: ...

  3. Omitted Variable Sensitivity Analysis with the Annotated Love Plot

    Science.gov (United States)

    Hansen, Ben B.; Fredrickson, Mark M.

    2014-01-01

    The goal of this research is to make sensitivity analysis accessible not only to empirical researchers but also to the various stakeholders for whom educational evaluations are conducted. To do this it derives anchors for the omitted variable (OV)-program participation association intrinsically, using the Love plot to present a wide range of…

  4. Addressing Omitted Prior Achievement Bias in International Assessments: An Applied Example Using PIRLS-NPD Matched Data

    Science.gov (United States)

    Caro, Daniel H.; Kyriakides, Leonidas; Televantou, Ioulia

    2018-01-01

    Omitted prior achievement bias is pervasive in international assessment studies and precludes causal inference. For example, reported negative associations between student-oriented teaching strategies and student performance are against expectations and might actually reflect omitted prior achievement bias. Namely, that these teaching strategies…

  5. Procurement and control of spare and replacement parts - a regulatory perspective

    International Nuclear Information System (INIS)

    Baker, E.T.; Grimes, B.K.; Merschoff, E.W.

    1987-01-01

    As the nuclear industry shifts from a construction to an operations orientation, a number of fundamental changes have occurred in the type of safety-related procurements and the manner in which the utilities accomplish these procurements. Specifically, procurements have shifted from the purchase of large systems and components by architect-engineers, and nuclear steam supply system (NSSS) suppliers to the procurement by utilities of subassemblies, individual pieces of equipment (e.g., breakers, relays), and small parts for repairing individual pieces of equipment. To ensure that equipment will continue to perform its intended function and to satisfy regulatory requirements utilities must consider several things: (1) does the equipment perform a safety function; (2) does the replacement part affect the safety function; and (3) does the replacement part affect the seismic or environmental qualification. If the answer to any of these questions is yes, the purchaser has two alternatives. He may procure the item as safety-related and require the supplier or manufacturer to comply with all the applicable technical and quality requirements or he may purchase the item commercial grade and perform the necessary inspections and tests to ensure the item meets the requirements, i.e., dedicate the item

  6. Novel Amalgams for In-Space Fabrication of Replacement Parts

    Science.gov (United States)

    Cochran, Calvin T.; Van Hoose, James R.; Grugel, R. N.

    2012-01-01

    Being able to fabricate replacement parts during extended space flight missions precludes the weight, storage volume, and speculation necessary to accommodate spares. Amalgams, widely used in dentistry, are potential candidates for fabricating parts in microgravity environments as they are moldable, do not require energy for melting, and do not pose fluid handling problems. Unfortunately, amalgams have poor tensile strength and the room temperature liquid component is mercury. To possibly resolve these issues a gallium-indium alloy was substituted for mercury and small steel fibers were mixed in with the commercial alloy powder. Subsequent microscopic examination of the novel amalgam revealed complete bonding of the components, and mechanical testing of comparable samples showed those containing steel fibers to have a significant improvement in strength. Experimental procedures, microstructures, and test results are presented and discussed in view of further improving properties.

  7. The Combined Effects of Measurement Error and Omitting Confounders in the Single-Mediator Model.

    Science.gov (United States)

    Fritz, Matthew S; Kenny, David A; MacKinnon, David P

    2016-01-01

    Mediation analysis requires a number of strong assumptions be met in order to make valid causal inferences. Failing to account for violations of these assumptions, such as not modeling measurement error or omitting a common cause of the effects in the model, can bias the parameter estimates of the mediated effect. When the independent variable is perfectly reliable, for example when participants are randomly assigned to levels of treatment, measurement error in the mediator tends to underestimate the mediated effect, while the omission of a confounding variable of the mediator-to-outcome relation tends to overestimate the mediated effect. Violations of these two assumptions often co-occur, however, in which case the mediated effect could be overestimated, underestimated, or even, in very rare circumstances, unbiased. To explore the combined effect of measurement error and omitted confounders in the same model, the effect of each violation on the single-mediator model is first examined individually. Then the combined effect of having measurement error and omitted confounders in the same model is discussed. Throughout, an empirical example is provided to illustrate the effect of violating these assumptions on the mediated effect.

  8. The Combined Effects of Measurement Error and Omitting Confounders in the Single-Mediator Model

    Science.gov (United States)

    Fritz, Matthew S.; Kenny, David A.; MacKinnon, David P.

    2016-01-01

    Mediation analysis requires a number of strong assumptions be met in order to make valid causal inferences. Failing to account for violations of these assumptions, such as not modeling measurement error or omitting a common cause of the effects in the model, can bias the parameter estimates of the mediated effect. When the independent variable is perfectly reliable, for example when participants are randomly assigned to levels of treatment, measurement error in the mediator tends to underestimate the mediated effect, while the omission of a confounding variable of the mediator to outcome relation tends to overestimate the mediated effect. Violations of these two assumptions often co-occur, however, in which case the mediated effect could be overestimated, underestimated, or even, in very rare circumstances, unbiased. In order to explore the combined effect of measurement error and omitted confounders in the same model, the impact of each violation on the single-mediator model is first examined individually. Then the combined effect of having measurement error and omitted confounders in the same model is discussed. Throughout, an empirical example is provided to illustrate the effect of violating these assumptions on the mediated effect. PMID:27739903

  9. Applying of neural networks in determination of replacement cycle of spare parts

    International Nuclear Information System (INIS)

    Saric, Tomislav; Majdandzic; Niko; Lujic, Roberto

    2003-01-01

    The article shows neural networks applicability to determine expected working time of equipment components before the damage. The results based on measure - simulated values of suggested model have been presented. Advantages of suggested model have been analyzed compared to traditional way of replacement of spare parts and components. Implementation possibility of suggested model in Management Information Maintenance System has been described. (author)

  10. Reduction rules-based search algorithm for opportunistic replacement strategy of multiple life-limited parts

    Directory of Open Access Journals (Sweden)

    Xuyun FU

    2018-01-01

    Full Text Available The opportunistic replacement of multiple Life-Limited Parts (LLPs is a problem widely existing in industry. The replacement strategy of LLPs has a great impact on the total maintenance cost to a lot of equipment. This article focuses on finding a quick and effective algorithm for this problem. To improve the algorithm efficiency, six reduction rules are suggested from the perspectives of solution feasibility, determination of the replacement of LLPs, determination of the maintenance occasion and solution optimality. Based on these six reduction rules, a search algorithm is proposed. This search algorithm can identify one or several optimal solutions. A numerical experiment shows that these six reduction rules are effective, and the time consumed by the algorithm is less than 38 s if the total life of equipment is shorter than 55000 and the number of LLPs is less than 11. A specific case shows that the algorithm can obtain optimal solutions which are much better than the result of the traditional method in 10 s, and it can provide support for determining to-be-replaced LLPs when determining the maintenance workscope of an aircraft engine. Therefore, the algorithm is applicable to engineering applications concerning opportunistic replacement of multiple LLPs in aircraft engines.

  11. Can we omit scintiscanning of the skeleton in follow-up aftercare of carcinoma of the breast?

    International Nuclear Information System (INIS)

    Schuenemann, H.

    1989-01-01

    630 women patients of the Bad Trissl clinic were admitted in 1987/88 to a prospective study to find out whether scintiscanning, or radionuclide imaging, of the skeleton can be omitted completely or in part in the after care and follow-up of carcinoma of the breast. The initial criterion was a postoperative carcinoma of the breast without metastasizing in the skeleton at the time the study began or the patient was admitted to the study. Careful pain anamnesis was performed by means of prepared questions, and a detailed clinical examination conducted to detect any pain in the skeleton of the patient concerned. This was followed by whole body scintiscanning of the skeleton and complementary X-ray films, if necessary additional examinations. It was found that clinical findings and imaging methods agreed in 545 patients. In 55 cases a finding that was clinically suspicious of metastases or doubtful, could be refuted by both scintiscan and by X-ray, osseous metastasizing would have been overlooked without skeleton scintiscan in 14 patients only (2.2%), 11 of these 14 patients were high-risk patients (negative hormonal receptor status, axillary lymph node metastases). Hence, it will be sufficient to employ scintiscanning in the aftercare and follow-up of carcinoma of the breast on a risk-adapted basis provided this is preceded by careful pain analysis and clinical examination. Failure to detect metastasizing in the skeleton will then occur in only 3 of 630 patients (0.48%). In this manner 40% of scintiscans can be omitted in future. (orig.) [de

  12. Wood ash used as partly sand and/or cement replacement in mortar

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Hansen, Esben Østergaard; Jensen, Pernille Erland

    2016-01-01

    , and the present work reports a characterization of three different WAs. Properties of mortar samples with the WAs used as partly cement and/or sand replacement are reported. Compressive strength development and porosity are the mortar properties in focus. The overall aim of the work is to evaluate the influence...... of the ashes were dry and sampled just after the incineration, whereas one ash had a water content of 15%, because the ash was sprayed with water to avoid dust during ash handling at the incineration plant. Regardless of replacing cement or sand with WAs, the compressive strength decreased compared...... to a reference without ash, however, the decrease was small for two of the ashes. Using the ash with the high LoI resulted in significantly lower compressive strength compared to the other two ashes. The mortar samples with two of the ashes (with low LoI) had qualities, which were very encouraging in order...

  13. OMIT: dynamic, semi-automated ontology development for the microRNA domain.

    Directory of Open Access Journals (Sweden)

    Jingshan Huang

    Full Text Available As a special class of short non-coding RNAs, microRNAs (a.k.a. miRNAs or miRs have been reported to perform important roles in various biological processes by regulating respective target genes. However, significant barriers exist during biologists' conventional miR knowledge discovery. Emerging semantic technologies, which are based upon domain ontologies, can render critical assistance to this problem. Our previous research has investigated the construction of a miR ontology, named Ontology for MIcroRNA Target Prediction (OMIT, the very first of its kind that formally encodes miR domain knowledge. Although it is unavoidable to have a manual component contributed by domain experts when building ontologies, many challenges have been identified for a completely manual development process. The most significant issue is that a manual development process is very labor-intensive and thus extremely expensive. Therefore, we propose in this paper an innovative ontology development methodology. Our contributions can be summarized as: (i We have continued the development and critical improvement of OMIT, solidly based on our previous research outcomes. (ii We have explored effective and efficient algorithms with which the ontology development can be seamlessly combined with machine intelligence and be accomplished in a semi-automated manner, thus significantly reducing large amounts of human efforts. A set of experiments have been conducted to thoroughly evaluate our proposed methodology.

  14. OMIT: dynamic, semi-automated ontology development for the microRNA domain.

    Science.gov (United States)

    Huang, Jingshan; Dang, Jiangbo; Borchert, Glen M; Eilbeck, Karen; Zhang, He; Xiong, Min; Jiang, Weijian; Wu, Hao; Blake, Judith A; Natale, Darren A; Tan, Ming

    2014-01-01

    As a special class of short non-coding RNAs, microRNAs (a.k.a. miRNAs or miRs) have been reported to perform important roles in various biological processes by regulating respective target genes. However, significant barriers exist during biologists' conventional miR knowledge discovery. Emerging semantic technologies, which are based upon domain ontologies, can render critical assistance to this problem. Our previous research has investigated the construction of a miR ontology, named Ontology for MIcroRNA Target Prediction (OMIT), the very first of its kind that formally encodes miR domain knowledge. Although it is unavoidable to have a manual component contributed by domain experts when building ontologies, many challenges have been identified for a completely manual development process. The most significant issue is that a manual development process is very labor-intensive and thus extremely expensive. Therefore, we propose in this paper an innovative ontology development methodology. Our contributions can be summarized as: (i) We have continued the development and critical improvement of OMIT, solidly based on our previous research outcomes. (ii) We have explored effective and efficient algorithms with which the ontology development can be seamlessly combined with machine intelligence and be accomplished in a semi-automated manner, thus significantly reducing large amounts of human efforts. A set of experiments have been conducted to thoroughly evaluate our proposed methodology.

  15. OMIT: Dynamic, Semi-Automated Ontology Development for the microRNA Domain

    Science.gov (United States)

    Huang, Jingshan; Dang, Jiangbo; Borchert, Glen M.; Eilbeck, Karen; Zhang, He; Xiong, Min; Jiang, Weijian; Wu, Hao; Blake, Judith A.; Natale, Darren A.; Tan, Ming

    2014-01-01

    As a special class of short non-coding RNAs, microRNAs (a.k.a. miRNAs or miRs) have been reported to perform important roles in various biological processes by regulating respective target genes. However, significant barriers exist during biologists' conventional miR knowledge discovery. Emerging semantic technologies, which are based upon domain ontologies, can render critical assistance to this problem. Our previous research has investigated the construction of a miR ontology, named Ontology for MIcroRNA Target Prediction (OMIT), the very first of its kind that formally encodes miR domain knowledge. Although it is unavoidable to have a manual component contributed by domain experts when building ontologies, many challenges have been identified for a completely manual development process. The most significant issue is that a manual development process is very labor-intensive and thus extremely expensive. Therefore, we propose in this paper an innovative ontology development methodology. Our contributions can be summarized as: (i) We have continued the development and critical improvement of OMIT, solidly based on our previous research outcomes. (ii) We have explored effective and efficient algorithms with which the ontology development can be seamlessly combined with machine intelligence and be accomplished in a semi-automated manner, thus significantly reducing large amounts of human efforts. A set of experiments have been conducted to thoroughly evaluate our proposed methodology. PMID:25025130

  16. The Effect Of Omitted Spatial Effects And Social Dependence In The Modelling Of Household Expenditure For Fruits And Vegetables

    Directory of Open Access Journals (Sweden)

    Łaszkiewicz Edyta

    2014-12-01

    Full Text Available As is well known, ignoring spatial heterogeneity leads to biased parameter estimates, while omitting the spatial lag of a dependent variable results in biasness and inconsistency (Anselin, 1988. However, the common approach to analysing households’ expenditures is to ignore the potential spatial effects and social dependence. In light of this, the aim of this paper is to examine the consequences of omitting the spatial effects as well as social dependence in households’ expenditures.

  17. OmniSearch: a semantic search system based on the Ontology for MIcroRNA Target (OMIT) for microRNA-target gene interaction data.

    Science.gov (United States)

    Huang, Jingshan; Gutierrez, Fernando; Strachan, Harrison J; Dou, Dejing; Huang, Weili; Smith, Barry; Blake, Judith A; Eilbeck, Karen; Natale, Darren A; Lin, Yu; Wu, Bin; Silva, Nisansa de; Wang, Xiaowei; Liu, Zixing; Borchert, Glen M; Tan, Ming; Ruttenberg, Alan

    2016-01-01

    As a special class of non-coding RNAs (ncRNAs), microRNAs (miRNAs) perform important roles in numerous biological and pathological processes. The realization of miRNA functions depends largely on how miRNAs regulate specific target genes. It is therefore critical to identify, analyze, and cross-reference miRNA-target interactions to better explore and delineate miRNA functions. Semantic technologies can help in this regard. We previously developed a miRNA domain-specific application ontology, Ontology for MIcroRNA Target (OMIT), whose goal was to serve as a foundation for semantic annotation, data integration, and semantic search in the miRNA field. In this paper we describe our continuing effort to develop the OMIT, and demonstrate its use within a semantic search system, OmniSearch, designed to facilitate knowledge capture of miRNA-target interaction data. Important changes in the current version OMIT are summarized as: (1) following a modularized ontology design (with 2559 terms imported from the NCRO ontology); (2) encoding all 1884 human miRNAs (vs. 300 in previous versions); and (3) setting up a GitHub project site along with an issue tracker for more effective community collaboration on the ontology development. The OMIT ontology is free and open to all users, accessible at: http://purl.obolibrary.org/obo/omit.owl. The OmniSearch system is also free and open to all users, accessible at: http://omnisearch.soc.southalabama.edu/index.php/Software.

  18. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert

    Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism

    Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves

  19. Management of Adolescent Low-Risk Classical Hodgkin Lymphoma: Which Chemotherapy Backbone Gives the Best Chance of Omitting Radiotherapy Safely.

    Science.gov (United States)

    Algiraigri, Ali H; Essa, Mohammed F

    2016-03-01

    Even though more than 90% of adolescents with low-risk classical Hodgkin lymphoma (LRcHL) will be cured with first-line therapy, many will suffer serious late toxic effects from radiotherapy (RT). The goals for care have shifted toward minimizing late toxic effects without compromising the outstanding cure rates by adapting a risk and response-based therapy. Recent published and ongoing randomized clinical trials, using functional imaging, may allow for better identification of those patients for whom RT may be safely omitted while maintaining excellent cure rates. To evaluate the best chemotherapy regimens with a reasonable toxicity profile and that are expected to have a high chance of omitting RT based on a response-directed therapy while maintaining high cure rates, a mini review was conducted of the recent clinical trials in pediatric and adult LRcHL. The UK RAPID trial chemotherapy backbone (3 × ABVD) followed by a response-based positron emission tomography scan offers up to a 75% chance of safely omitting RT without compromising the cure rate, which remained well above 90%.

  20. The Omitted Factor in Risk Management: Corporate Foreign Debt as an Alternative to Currency Derivatives

    DEFF Research Database (Denmark)

    Aabo, Tom

    Empirical surveys on exchange rate risk management in non-financial companies focus on the use of currency derivatives while omitting the use of corporate debt denominated in foreign currency ("foreign debt") even though the latter in risk management terms is identical to one or a series of forward...

  1. The patient's experience of temporary paralysis from spinal anaesthesia, a part of total knee replacement

    DEFF Research Database (Denmark)

    Bager, Louise; Konradsen, Hanne; Dreyer, Pia Sander

    2015-01-01

    AIMS AND OBJECTIVES: The aim of this study was to describe the meaning of being temporary paralysed from spinal anaesthesia when undergoing total knee replacement. BACKGROUND: Total knee arthroplasty is a common procedure, and regional anaesthesia is used as a method for anaesthetising the patient...... of the experience of spinal anaesthesia, as a part of having a total knee replacement. METHODS: Twelve patients were interviewed in March 2014 after undergoing an elective total knee arthroplasty under spinal anaesthesia. The interviews were analysed with a Ricoeur-inspired interpretation method. RESULTS: Three...... TO CLINICAL PRACTICE: The results of this study contribute to insights and deeper knowledge that can enhance staff's ability to provide care for patients undergoing total knee arthroplasty in spinal anaesthesia. The results provide perspectives that argue for care in accordance to individual needs....

  2. Evaluating two model reduction approaches for large scale hedonic models sensitive to omitted variables and multicollinearity

    DEFF Research Database (Denmark)

    Panduro, Toke Emil; Thorsen, Bo Jellesmark

    2014-01-01

    Hedonic models in environmental valuation studies have grown in terms of number of transactions and number of explanatory variables. We focus on the practical challenge of model reduction, when aiming for reliable parsimonious models, sensitive to omitted variable bias and multicollinearity. We...

  3. 24 CFR 880.602 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 880.602... Replacement reserve. (a) A replacement reserve must be established and maintained in an interest-bearing account to aid in funding extraordinary maintenance and repair and replacement of capital items. (1) Part...

  4. 43 CFR 30.126 - What happens if property was omitted from the inventory of the estate?

    Science.gov (United States)

    2010-10-01

    ... the inventory of the estate? 30.126 Section 30.126 Public Lands: Interior Office of the Secretary of the Interior INDIAN PROBATE HEARINGS PROCEDURES Judicial Authority and Duties § 30.126 What happens if property was omitted from the inventory of the estate? This section applies when, after issuance of a...

  5. Green and economic fleet replacement modeling : part I.

    Science.gov (United States)

    2011-10-01

    "The purpose of this study was to gain a better understanding of how equipment replacement decisions are supported with data collection and : quantitative models at state DOTs, and to determine if models found in the research literature offer any bet...

  6. Effect of part replacement of silica sand with carbon black on composite properties

    International Nuclear Information System (INIS)

    Adeosun, B.F.; Olaofe, O.

    2003-01-01

    We have reported the properties of natural rubber filled with locally available materials (Adu et al 2000). The effect of local clay, limestone, silica sand and charcoal on the properties of natural rubber has been examined. Results have shown detrimental effects of silica sand on the properties of natural rubber compound. It has been reported that when silica is used as a part for part replacement of carbon black, the heat build up the composite decreased whilst tear resistance improved. Results revealed that within the filler content range used in the present work, the hardness, modulus, and tensile strength of composites loaded with silica sand/carbon black showed enhanced magnitude over the composite loaded singly with silica sand. These parameters generally increased with increasing carbon black content in the composite. New area of use requiring moderate level of tensile strength, hardness and modulus (as in soles of shoes and engine mounts) is therefore opened up for silica sand.(author)

  7. The effect of omitting an early population-based vision screen in the Netherlands : A micro-simulation model approach

    NARCIS (Netherlands)

    F. Sloot; E. Heijnsdijk; F. Goudsmit; E.W. Steyerberg; H.J. de Koning; H.J. Simonsz; Dr. J.H. Groenewoud

    2016-01-01

    To estimate the effect of omitting an individual screen from a child vision screening programme on the detection of amblyopia in the Netherlands. A previous study (Rotterdam Amblyopia Screening Effectiveness Study) suggested that the three screens carried out between 6 and 24 months contributed

  8. 13 CFR 126.308 - What happens if SBA inadvertently omits a qualified HUBZone SBC from the List?

    Science.gov (United States)

    2010-01-01

    ... writing at U.S. Small Business Administration, 409 Third Street, SW., Washington, DC 20416 or via e-mail... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What happens if SBA inadvertently omits a qualified HUBZone SBC from the List? 126.308 Section 126.308 Business Credit and Assistance...

  9. Prioritization methodology for chemical replacement

    Science.gov (United States)

    Cruit, Wendy; Goldberg, Ben; Schutzenhofer, Scott

    1995-01-01

    to be quantitatively compared in several categories, and a QFD matrix which allows process/chemical pairs to be rated against one another for importance (using consistent categories). Depending on the need for application, one can choose the part(s) needed or have the methodology completed in its entirety. For example, if a program needs to show the risk of changing a process/chemical one may choose to use part of Matrix A and Matrix C. If a chemical is being used, and the process must be changed; one might use the Process Concerns part of Matrix D for the existing process and all possible replacement processes. If an overall analysis of a program is needed, one may request the QFD to be completed.

  10. Excellence in fleet combat replacement squadrons: predicting carrier qualification success

    OpenAIRE

    Smith, Martin P.

    1988-01-01

    This thesis presents a two-part analysis of excellence criteria for fleet combat replacement squadrons. Part one focuses on the qualitative issues and management techniques identified in outstanding fleet combat replacement squadrons. Part two develops and presents a regression model for predicting a fleet replacement squadron pilot's carrier qualification grade. The model was derived using standard linear regression techniques and the SPSSx software package of the Naval Postgraduate School. ...

  11. Laparoscopic radical prostatectomy: omitting a pelvic drain

    Directory of Open Access Journals (Sweden)

    David Canes

    2008-03-01

    Full Text Available PURPOSE: Our goal was to assess outcomes of a selective drain placement strategy during laparoscopic radical prostatectomy (LRP with a running urethrovesical anastomosis (RUVA using cystographic imaging in all patients. Materials and Methods: A retrospective chart review was performed for all patients undergoing LRP between January 2003 and December 2004. The anastomosis was performed using a modified van Velthoven technique. A drain was placed at the discretion of the senior surgeon when a urinary leak was demonstrated with bladder irrigation, clinical suspicion for a urinary leak was high, or a complex bladder neck reconstruction was performed. Routine postoperative cystograms were obtained. RESULTS: 208 patients underwent LRP with a RUVA. Data including cystogram was available for 206 patients. The overall rate of cystographic urine leak was 5.8%. A drain was placed in 51 patients. Of these, 8 (15.6% had a postoperative leak on cystogram. Of the 157 undrained patients, urine leak was radiographically visible in 4 (2.5%. The higher leak rate in the drained vs. undrained cohort was statistically significant (p = 0.002. Twenty-four patients underwent pelvic lymph node dissection (8 drained, 16 undrained. Three undrained patients developed lymphoceles, which presented clinically on average 3 weeks postoperatively. There were no urinomas or hematomas in either group. CONCLUSIONS: Routine placement of a pelvic drain after LRP with a RUVA is not necessary, unless the anastomotic integrity is suboptimal intraoperatively. Experienced clinical judgment is essential and accurate in identifying patients at risk for postoperative leakage. When suspicion is low, omitting a drain does not increase morbidity.

  12. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  13. 14 CFR 21.9 - Replacement and modification articles.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Replacement and modification articles. 21.9... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS General § 21.9 Replacement and modification articles. (a) If a person knows, or should know, that a replacement or modification article is reasonably likely to be...

  14. Hip joint replacement - slideshow

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/presentations/100006.htm Hip joint replacement - series—Normal anatomy To use the ... to slide 5 out of 5 Overview The hip joint is made up of two major parts: ...

  15. Quality and Safety in Health Care, Part XXXII: Additional Outcome Predictors for Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Harolds, Jay A

    2018-02-01

    Mortality 12 months after a transcatheter aortic valve replacement (TAVR) is partly due to a number of reasons in addition to the usual preprocedural medical patient risk factors. In patients who need a permanent pacemaker placed after the procedure, the mortality risk goes up. The death rate following a TAVR varies considerably at different institutions, and the past death rate of TAVR patients at an institution is predictive of the mortality rate of new patients having this procedure. In addition, the quality of life of the individual before the procedure is predictive of the 12-month mortality outcome after the TAVR is done.

  16. Plain Radiography May Be Safely Omitted for Selected Major Trauma Patients Undergoing Whole Body CT: Database Study

    Directory of Open Access Journals (Sweden)

    Sarah Hudson

    2012-01-01

    Full Text Available Introduction. Whole body CT is being used increasingly in the primary survey of major trauma patients. We evaluated whether omitting plain films of the chest and pelvis in the primary survey was safe. We compared the probability of survival of patients and time to CT who had plain X-rays to those who did not. Method. We performed a database study on major trauma patients admitted between 2008 and 2010 using data from Trauma, Audit and Research Network (TARN and our PACS system. We included adult major trauma patients who has an ISS of greater than 15 and underwent whole body CT. Results. 245 patients were included in the study. 44 (17.9% did not undergo plain films. The median time to whole body CT from the time of admission was longer (47 minutes in patients having plain films, than those who did not have plain films performed (30 minutes, P<0.005. Mortality was increased in the group who received plain films, 9.5% compared to 4.5%, but this was not statistically significant (P=0.77. Conclusion. We conclude that plain films may be safely omitted during the primary survey of selected major trauma patients.

  17. New Firm Performance and the Replacement of Founder-CEOs

    DEFF Research Database (Denmark)

    Chen, Jing; Thompson, Peter

    2015-01-01

    We study the causes and consequences of the replacement of founder-CEOs in a sample of 4,172 Danish start-ups. We propose that founder-CEO replacement is driven in part by mismatches between business quality and founder ability. Our framework suggests that replacements are more likely among...... the worst- and best-performing firms, with low (high)-ability founders replaced by manager with higher (lower) ability. Replacement is not unambiguously associated with better subsequent performance. Firms that replaced the founder were much more likely to fail, but the surviving firms among them grew...

  18. A single - item replacement decision model for repairable spare ...

    African Journals Online (AJOL)

    In this paper, we present an analytical method for determining spare parts replacement over an infinite planning horizon. (The objective is to minimize the total system cost). We develop an exact and simple method for determining the time for equipment replacement or making decision about when to replace equipments, ...

  19. Design verification for reactor head replacement

    International Nuclear Information System (INIS)

    Dwivedy, K.K.; Whitt, M.S.; Lee, R.

    2005-01-01

    This paper outlines the challenges of design verification for reactor head replacement for PWR plants and the program for qualification from the prospective of the utility design engineering group. This paper is based on the experience with the design confirmation of four reactor head replacements for two plants, and their interfacing components, parts, appurtenances, and support structures. The reactor head replacement falls under the jurisdiction of the applicable edition of the ASME Section XI code, with particular reference to repair/replacement activities. Under any repair/replacement activities, demands may be encountered in the development of program and plan for replacement due to the vintage of the original design/construction Code and the design reports governing the component qualifications. Because of the obvious importance of the reactor vessel, these challenges take on an added significance. Additional complexities are introduced to the project, when the replacement components are fabricated by vendors different from the original vendor. Specific attention is needed with respect to compatibility with the original design and construction of the part and interfacing components. The program for reactor head replacement requires evaluation of welding procedures, applicable examination, test, and acceptance criteria for material, welds, and the components. Also, the design needs to take into consideration the life of the replacement components with respect to the extended period of operation of the plant after license renewal and other plant improvements. Thus, the verification of acceptability of reactor head replacement provides challenges for development and maintenance of a program and plan, design specification, design report, manufacturer's data report and material certification, and a report of reconciliation. The technical need may also be compounded by other challenges such as widely scattered global activities and organizational barriers, which

  20. 16 CFR 501.3 - Replacement bags for vacuum cleaners.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Replacement bags for vacuum cleaners. 501.3... REQUIREMENTS AND PROHIBITIONS UNDER PART 500 § 501.3 Replacement bags for vacuum cleaners. Replacement bags for..., provided: (a) The quantity of contents is expressed in terms of numerical count of the bags; (b) A...

  1. Opportunity-based block replacement: the single component case

    NARCIS (Netherlands)

    R. Dekker (Rommert); E. Smeitink

    1991-01-01

    textabstractIn this paper we consider a block replacement model in which a component can be replaced preventively at maintenance opportunities only. Maintenance opportunities occur randomly and are modelled through a renewal process. In the first, theoretical part of the paper we derive an

  2. Omitting elective nodal irradiation during thoracic irradiation in limited-stage small cell lung cancer--evidence from a phase II trial.

    Science.gov (United States)

    Colaco, Rovel; Sheikh, Hamid; Lorigan, Paul; Blackhall, Fiona; Hulse, Paul; Califano, Raffaele; Ashcroft, Linda; Taylor, Paul; Thatcher, Nicholas; Faivre-Finn, Corinne

    2012-04-01

    Omitting elective nodal irradiation (ENI) in limited-stage disease small cell lung cancer (LD-SCLC) is expected to result in smaller radiation fields. We report on data from a randomised phase II trial that omitted ENI in patients receiving concurrent chemo-radiotherapy for LD-SCLC. 38 patients with LD-SCLC were randomised to receive once-daily (66 Gy in 33 fractions) or twice-daily (45 Gy in 30 fractions) radiotherapy (RT). 3D-conformal RT was given concurrently with cisplatin and etoposide starting with the second cycle of a total of four cycles. The gross tumour volume was defined as primary tumour with involved lymph nodes (nodes ≥1 cm in short axis) identifiable with CT imaging. ENI was not used. Six recurrence patterns were identified: recurrence within planning target volume (PTV) only, recurrence within PTV+regional nodal recurrence and/or distant recurrence, isolated nodal recurrence outside PTV, nodal recurrence outside PTV+distant recurrence, distant metastases only and no recurrence. At median follow-up 16.9 months, 31/38 patients were evaluable and 14/31 patients had relapsed. There were no isolated nodal recurrences. Eight patients relapsed with intra-thoracic disease: 2 within PTV only, 4 within PTV and distantly and 2 with nodal recurrence outside PTV plus distant metastases. Rates of grade 3+ acute oesophagitis and pneumonitis in the 31 evaluable patients were 23 and 3% respectively. In our study of LD-SCLC, omitting ENI based on CT imaging was not associated with a high risk of isolated nodal recurrence, although further prospective studies are needed to confirm this. Routine ENI omission will be further evaluated prospectively in the ongoing phase III CONVERT trial (NCT00433563). Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  3. Software-based annunciator replacement: a tale of two projects

    International Nuclear Information System (INIS)

    Simmons, G.T.

    2015-01-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  4. Software-based annunciator replacement: a tale of two projects

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, G.T., E-mail: simmongt@westinghouse.com [Westinghouse Electric Company LLC, Cranberry Township, PA (United States)

    2015-07-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  5. 14 CFR 21.303 - Replacement and modification parts.

    Science.gov (United States)

    2010-01-01

    ... conforms to the drawings in the design; and (4) That the fabrication processes, construction, and assembly... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Approval of Materials, Parts, Processes, and... the configuration of the part; and (ii) Information on dimensions, materials, and processes necessary...

  6. 23 CFR 661.19 - When is a bridge eligible for replacement?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false When is a bridge eligible for replacement? 661.19... replacement? To be eligible for replacement, the bridge must be considered structurally deficient or functionally obsolete and must be in accordance with 23 CFR part 650.409(a) for bridge replacement. After an...

  7. The maximum percentage of fly ash to replace part of original Portland cement (OPC) in producing high strength concrete

    Science.gov (United States)

    Mallisa, Harun; Turuallo, Gidion

    2017-11-01

    This research investigates the maximum percent of fly ash to replace part of Orginal Portland Cement (OPC) in producing high strength concrete. Many researchers have found that the incorporation of industrial by-products such as fly ash as in producing concrete can improve properties in both fresh and hardened state of concrete. The water-binder ratio was used 0.30. The used sand was medium sand with the maximum size of coarse aggregate was 20 mm. The cement was Type I, which was Bosowa Cement produced by PT Bosowa. The percentages of fly ash to the total of a binder, which were used in this research, were 0, 10, 15, 20, 25 and 30%; while the super platicizer used was typed Naptha 511P. The results showed that the replacement cement up to 25 % of the total weight of binder resulted compressive strength higher than the minimum strength at one day of high-strength concrete.

  8. Opportunity-based age replacement policy with minimal repair

    International Nuclear Information System (INIS)

    Jhang, J.P.; Sheu, S.H.

    1999-01-01

    This paper proposes an opportunity-based age replacement policy with minimal repair. The system has two types of failures. Type I failures (minor failures) are removed by minimal repairs, whereas type II failures are removed by replacements. Type I and type II failures are age-dependent. A system is replaced at type II failure (catastrophic failure) or at the opportunity after age T, whichever occurs first. The cost of the minimal repair of the system at age z depends on the random part C(z) and the deterministic part c(z). The opportunity arises according to a Poisson process, independent of failures of the component. The expected cost rate is obtained. The optimal T * which would minimize the cost rate is discussed. Various special cases are considered. Finally, a numerical example is given

  9. Using Cementitious Materials Such as Fly Ash to Replace a Part of Cement in Producing High Strength Concrete in Hot Weather

    Science.gov (United States)

    Turuallo, Gidion; Mallisa, Harun

    2018-03-01

    The use of waste materials in concrete gave many advantages to prove the properties of concrete such as its workability, strength and durability; as well to support sustaianable development programs. Fly ash was a waste material produced from coal combustion. This research was conducted to find out the effect of fly ash as a part replacement of cement to produce high strength concrete. The fly ash, which was used in this research, was taken from PLTU Mpanau Palu, Central Sulawesi. The water-binder ratio used in this research was 0.3 selected from trial mixes done before. The results of this research showed that the strength of fly ash concretes were higher than concrete with PCC only. The replacement of cement with fly ash concrete could be up to 20% to produce high strength concrete.

  10. Feasibility of omitting clinical target volume for limited-disease small cell lung cancer treated with chemotherapy and intensity-modulated radiotherapy

    International Nuclear Information System (INIS)

    Cai, Shuhua; Shi, Anhui; Yu, Rong; Zhu, Guangying

    2014-01-01

    To analyze the feasibility of omitting clinical target volume (CTV) for limited small cell lung cancer treated with chemotherapy and intensity modulated radiotherapy. 89 patients were treated from January 1, 2008 to August 31, 2011, 54 cases were irradiated with target volume without CTV, and 35 cases were irradiated with CTV. Both arms were irradiated post chemotherapy tumor extent and omitted elective nodal irradiation; dose prescription was 95% PTV56-63 Gy/28-35 F/5.6-7 weeks. In the arm without CTV and arm with CTV, the local relapse rates were 16.7% and 17.1% (p = 0.586) respectively. In the arm without CTV, of the 9 patients with local relapse, 6 recurred in-field, 2 recurred in margin, 1 recurred out of field. In the arm with CTV, of the 6 patients with local relapse, 4 recurred in-field, 1 recurred in margin, 1 recurred out of field. The distant metastases rates were 42.6% and 51.4% (p = 0.274) respectively. Grade 3-4 hematological toxicity and radiation esophagitis had no statistically significant, but grade 3-4 radiation pneumonia was observed in only 7.4% in the arm without CTV, compared 22.9% in the arm with CTV (p = 0.040). The median survival in the arm without CTV had not reached, compared with 38 months in the with CTV arm. The l- years, 2- years, 3- years survival rates of the arm without CTV and the arm with CTV were 81.0%, 66.2%, 61.5% and 88.6%, 61.7%, 56.6% (p = 0.517). The multivariate analysis indicated that the distant metastases (p = 0.000) and PCI factor (p = 0.004) were significantly related to overall survival. Target delineation omitting CTV for limited-disease small cell lung cancer received IMRT was feasible. The distant metastases and PCI factor were significantly related to overall survival

  11. Steam generator replacement from ALARA aspects

    International Nuclear Information System (INIS)

    Terry, I.; Breznik, B.

    2003-01-01

    This paper is going to consider radiological related parameters important for steam generator replacement (SGR) implementation. These parameters are identified as ALARA related parameters, owner-contractor relationship, planning, health physics with logistic services, and time required for the replacement. ALARA related parameters such as source or initial dose rate and plant system configuration define the initial conditions for the planning. There is room to optimise work planning. managerial procedures and also the staff during the implementation phase. The overview of these general considerations is based on the following background: using internationally available data and the experience of one of the vendors, i.e. Siemens-Framatome, and management experience of SG replacement which took place at Krsko NPP in the spring of 2000. Generally plant decisions on maintenance or repair procedures under radiation conditions take into account ALARA considerations. But in the main it is difficult to adjudge the results of an ALARA study, usually in the form of a collective dose estimate, because a comparison standard is missing. That is, very often the planned work is of a one-off nature so comparisons are not possible or the scopes are not the same. In such a case the collective doses for other types of work are looked at and a qualitative evaluation is made. In the case of steam generator replacement this is not the case. Over years of steam generator replacements world-wide a standard has been developed gradually. The first part of the following displays an overview of SGR and sets the Krsko SGR in perspective by applying dose analysis. The second part concentrates on the Krsko SGR itself and its ALARA aspects. (authors)

  12. Criteria for the replacement of restorations

    DEFF Research Database (Denmark)

    Wilson, Nairn; Lynch, Christopher; Brunton, Paul Brunton

    2016-01-01

    The replacement of a restoration is one of the most common procedures in dentistry. However, the criteria for such intervention, excluding catastrophic failure and persistent discomfort and pain, continue to be the subject of considerable debate. The decision-making process remains subjective...... on the part of the treating clinician, while the evidence base for refurbishment and repair rather than replacement for the management of defective and failing restorations continues to grow and strengthen. This article, prepared as an Academy of Operative Dentistry European Section consensus publication...

  13. Case Study of a physiotherapy treatment of a patient after total hip replacement

    OpenAIRE

    Havlíčková, Barbora

    2013-01-01

    The bachelor's thesis consists of two parts. The general part includes anatomy and kinesiology of the hip joint and also the topic of coxarthrosis as the most common reason for the total hip replacement surgery. An integral part of this part is the elaboration of a rehabilitation plan for patients undergoing such procedure. The practical part of the thesis is conceived a case study of a patient after total hip replacement because of coxarthrosis. Finally, the thesis includes the therapeutic o...

  14. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  15. Report on the meeting for examining replacing core

    International Nuclear Information System (INIS)

    1977-01-01

    At the time of examining the application for approval of reactor installation, it must be confirmed that the safety of the concerned reactor is secured with not only the initially loaded core but also the replacing core. Besides, it must be confirmed again that the various criteria concerning the safety are satisfied after the start of operation, because a part of the parameters of the replacing core is dependent on the operational history. On the above described viewpoints, the main parameters affecting the safety and the nuclear and thermal limits of replacing core were reviewed. Moreover, the contents of description concerning replacing core in the application form were examined. As the general matters concerning the safety of replacing core, the scram reactivity curves for BWRs and PWRs, the method of description in the application form concerning the fuel containing gadolinia, and the use of burnable poison in replacing core were examined. The meeting for examining replacing core was organized on September 20, 1976, at the Committee for Examining Reactor Safety, and this report was compiled as the results of 10 meetings. (Kako, I.)

  16. 75 FR 71548 - Clarification of the Post Office Box Lock Replacement Fee

    Science.gov (United States)

    2010-11-24

    ... POSTAL SERVICE 39 CFR Part 111 Clarification of the Post Office Box Lock Replacement Fee AGENCY... of the lock replacement fee for Post Office TM boxes to reflect current practice. DATES: January 2... Standards for Domestic Mailing Services (75 FR 39477-39492). The applicability of the lock replacement fee...

  17. Career Preparation: An Often Omitted Element of the Advisor-Graduate Student Relationship

    Science.gov (United States)

    McManus, D. A.

    2001-05-01

    Most graduate research advisors care about the education of their graduate students. However, they often define "graduate education" so narrowly that it consists only of solving a research problem. This narrow definition is consistent with their principal goal as geoscientists, to understand the Earth better, and with the reward system typical of research universities, with its emphasis on research. As a result, most advisors usually well prepare students to be researchers in research universities. Research, however, is only part of a faculty member's duties. Commonly omitted is mentoring in the teaching and service duties of a faculty member. Students interested in teaching, in positions in other academic institutions, or in careers outside of academia may be perceived as questioning the advisors' career values and may not be encouraged in these interests. Graduate students should take an active role in their education. In addition to seeking information on career preparation from the campus career center and teaching center and from books, newsmagazines, newspapers, and seminars, students should also seek mentors who have demonstrated an interest in what the student is interested in: teaching and service, as well as research, or in careers outside academia. These mentors may be the students' committee members, other faculty members, or other professional geoscientists. With a broad base of information and some personal decisions, students will have a rationale for exploring careers. The questions students ask can now be more specific: How do they gain the requisite breadth in knowledge and the beneficial skills, beyond the depth of the research experience, and how do they gain opportunities to practice these skills? In short, how can they experience, and preferably practice, what professional geoscientists do in particular careers? If necessary, graduate students can work together to answer these questions by inviting experts to offer workshops in the department

  18. Lactose in milk replacer can partly be replaced by glucose, fructose, or glycerol without affecting insulin sensitivity in veal calves

    NARCIS (Netherlands)

    Pantophlet, A. J.; Gilbert, M. S.; van den Borne, J. J. G. C.; Gerrits, W. J. J.; Roelofsen, H.; Priebe, M. G.; Vonk, R. J.

    Calf milk replacer (MR) contains 40 to 50% lactose. Lactose strongly fluctuates in price and alternatives are desired. Also, problems with glucose homeostasis and insulin sensitivity (i.e., high incidence of hyperglycemia and hyperinsulinemia) have been described for heavy veal calves (body weight

  19. Survey on Inadequate and Omitted Citations in Manuscripts: A Precursory Study in Identification of Tasks for a Literature Review and Manuscript Writing Assistive System

    Science.gov (United States)

    Raamkumar, Aravind Sesagiri; Foo, Schubert; Pang, Natalie

    2016-01-01

    Introduction: This paper looks at the issue of inadequate and omitted citations in manuscripts by collecting the experiential opinions of researchers from the dual perspectives of manuscript reviewers and authors. Method: An online survey was conducted with participation from 207 respondents who had experience of reviewing and authoring research…

  20. Assessing residual cancer cells using MRI and US after preoperative chemotherapy in primary breast cancer to omit surgery.

    Science.gov (United States)

    Iwase, Madoka; Sawaki, Masataka; Hattori, Masaya; Yoshimura, Akiyo; Ishiguro, Junko; Kotani, Haruru; Gondo, Naomi; Adachi, Yayoi; Kataoka, Ayumi; Onishi, Sakura; Sugino, Kayoko; Iwata, Hiroji

    2018-04-04

    Enhanced magnetic resonance imaging (MRI) and ultrasonography (US) are used to assess residual lesions after preoperative chemotherapy before surgery. However, residual lesion assessments based on preoperative imaging often differ from postoperative pathologic diagnoses. We retrospectively reviewed the accuracy of preoperative residual lesion assessments, including ductal carcinoma in situ (DCIS) cases to find criteria for cases in which surgery can be omitted. We reviewed 201 patients who received preoperative chemotherapy and surgery in our hospital from January 2013 to November 2016. Presurgical evaluations regarding the possible existence of residual lesions, and clinical Complete Response (cCR) or non-cCR, were compared with postoperative pathological diagnoses. Of the 201 patients, 52 were diagnosed with cCR, and 39 with pathological complete response (pCR). Predictions for residual lesions were 86.4% sensitive, 76.9% specific, and 84.6% accurate. When patients were divided into 4 groups by estrogen receptor (ER) and HER2 status, sensitivity in each group was ER + /HER2 - : 91.4%; ER - /HER2 - : 94.1%; ER + /HER2 + : 78.6%; and ER - /HER2 + : 78.5%. Of the 22 patients preoperatively assessed with cCR, but diagnosed with non-pCR, the median invasive residual tumor size was 2 mm (range 0-46 mm); 5 patients (22.7%) had only DCIS. Predicting residual lesions after preoperative chemotherapy by using MRI and US is a reasonable strategy. However, current methods are inadequate for identifying patients who can omit surgery; therefore, a new strategy for detecting small tumors in these patients is needed.

  1. Medicare Program; Comprehensive Care for Joint Replacement Payment Model for Acute Care Hospitals Furnishing Lower Extremity Joint Replacement Services. Final rule.

    Science.gov (United States)

    2015-11-24

    This final rule implements a new Medicare Part A and B payment model under section 1115A of the Social Security Act, called the Comprehensive Care for Joint Replacement (CJR) model, in which acute care hospitals in certain selected geographic areas will receive retrospective bundled payments for episodes of care for lower extremity joint replacement (LEJR) or reattachment of a lower extremity. All related care within 90 days of hospital discharge from the joint replacement procedure will be included in the episode of care. We believe this model will further our goals in improving the efficiency and quality of care for Medicare beneficiaries with these common medical procedures.

  2. Provision of faultiness of technical objects on the computerized simulation base of their elements replacements

    International Nuclear Information System (INIS)

    Muzdybaev, M.S.; Kul'seitov, A.Zh.

    2002-01-01

    It is noted, that on the base of technical system reliability analysis items of replacements (repair) of a good's parts are considered. It is shown, that one of the way of a good reliability task solution is formation of groups of a good parts joint replacements. Advantages which under similar approach are first of al revealing both the high faultiness level and the system work ability. It is determined, that it is purposively parts limiting of a good reliability joint in groups of its joint replacements, at that its amount it is necessary to achieving a minimum

  3. Consequences of dietary energy source and energy level on energy balance, lactogenic hormones, and lactation curve characteristics of cows after a short or omitted dry period

    NARCIS (Netherlands)

    van Hoeij, R J; Dijkstra, J; Bruckmaier, R.M.; Gross, James J; Lam, T J G M; Remmelink, G J; Kemp, B.; Knegsel, A.T.M.

    2017-01-01

    Omitting the dry period (DP) generally reduces milk production in the subsequent lactation. The aim of this study was to evaluate the effect of dietary energy source-glucogenic (G) or lipogenic (L)-and energy level-standard (std) or low-on milk production; energy balance (EB); lactogenic hormones

  4. 30 CFR 75.504 - Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face...

    Science.gov (United States)

    2010-07-01

    ... STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.504 Permissibility of new, replacement... new, replacement, used, reconditioned, and additional electric face equipment used in any mine..., unless in the opinion of the Secretary, such equipment or necessary replacement parts are not available...

  5. Replacement Power Facility site selection report

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  6. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    Iizuka, N.

    2000-01-01

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  7. Ranking hospitals for outcomes in total hip replacement - administrative data with or without patient surveys? - Part 2: Patient survey and administrative data

    Directory of Open Access Journals (Sweden)

    Schäfer, Thomas

    2007-03-01

    Full Text Available Background: Many hospital rankings rely on the frequency of adverse outcomes and are based on administrative data. In the study presented here, we tried to find out, to what extent available administrative data of German Sickness Funds allow for an adequate hospital ranking and compared this with rankings based on additional information derived from a patient survey. Total hip replacement was chosen as an example procedure. In part II of the publication, we present the results of the approach based on administrative and patient-derived data. Methods: We used administrative data from a large health insurance (AOK-Lower Saxony of the year 2002 and from a patient survey. The study population comprised mainly beneficiaries, who received primary total hip replacement in the year 2002, were mailed a survey 6 month post-operatively and participated in the survey. Performance indicators used where “Revision”, “Complications” and “Change of functional impairment”. Hospitals were ranked if they performed at least 20 procedures on AOK-beneficiaries. Multivariate modelling (logistic regression and generalized linear models was used to estimate the performance indicators by case-mix variables (a.o. age, sex, co-morbidity, medical history and hospital characteristics (hospital size, surgical volume. The actual ranking was based on these multivariate models, excluding hospital variables and adding dummy-variables for each hospital. Hospitals were ranked by their case-mix adjusted odds ratio or Standardized Difference (SDR with respect to a pre-selected reference hospital. The resulting rankings were compared with each other and with regard to the impact of case-mix variables. Results: 4089 beneficiaries received primary total hip replacement in 2002. 3293 patients participated in the survey (80.5%. The ranking included 60 hospitals. The agreement of rankings based on different performance indicators in the same year was low to high (a correlation

  8. The Reliable Replacement Warhead Program: Background and Current Developments

    National Research Council Canada - National Science Library

    Medalia, Jonathan

    2008-01-01

    ...), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992...

  9. Consequences of dietary energy source and energy level on energy balance, lactogenic hormones, and lactation curve characteristics of cows after a short or omitted dry period

    NARCIS (Netherlands)

    Hoeij, van R.J.; Dijkstra, J.; Bruckmaier, R.M.; Gross, J.J.; Lam, Theo J.G.M.; Remmelink, G.J.; Kemp, B.; Knegsel, van A.T.M.

    2017-01-01

    Omitting the dry period (DP) generally reduces milk production in the subsequent lactation. The aim of this study was to evaluate the effect of dietary energy source—glucogenic (G) or lipogenic (L)—and energy level—standard (std) or low—on milk production; energy balance (EB); lactogenic hormones

  10. Comparison of blood loss between using non central part cutting knee prosthesis and distal central part cutting.

    Science.gov (United States)

    Malairungsakul, Anan

    2014-12-01

    Patients who undergo knee replacement surgery may need to receive a blood transfusion due to blood loss during the operation. Therefore it was important to improve the design of knee implant operative procedures in an attempt to reduce the rate of blood loss. The present study aimed to compare the blood loss between two types of knee replacement surgery. This is a retrospective study in which 78 patients received cemented knee replacements in Phayao Hospital between October 2010 and March 2012. There were two types of surgical procedure: 1) using an implant position covering the end of the femoral bone without cutting into the central part of the distal femoral, 2) using an implant position covering the end of the femoral bone cutting the central part of the distal femoral. Blood loss, blood transfusion, hemoglobin and hematocrit were recorded preoperatively, immediately postsurgery and 48 hours after surgery. Findings revealed that the knee replacement surgery using the implant position covering the end of the femoral bone without cutting the central part of the distal femoral significantly lowered the rate of blood loss when compared to using the implant position covering the end of the femoral bone with central cutting of the distal femor. The average blood loss during the operation without cutting at the central part of distal femoral was 49.50 ± 11.11 mL; whereas the operation cutting the central part of the distal femoral was 58.50 ± 11.69 mL. As regards blood loss, the knee replacement surgery using the implant position covering the end ofthefemoral bone without cutting the central part of distal femor was better than using the implant position covering the end of the femoral bone cutting at the central part of the distal femor.

  11. Seismic Performances of Replaceable Steel Connection with Low Yield Point Metal

    Directory of Open Access Journals (Sweden)

    Haoxiang He

    2015-01-01

    Full Text Available Compared with the traditional steel rigid connection, the beam-column connections with weakened beam end have better ductility, but the local buckling in the weakened zone and the overall lateral deformation may occur in strong earthquake. The replaceable steel connection with low yield point metal is proposed based on the concept of earthquake resilient structure. In this connection, the weakened parts in the flange slab and web plate are filled with low yield point metal, and the metal firstly yields and dissipates energy sufficiently in earthquake; hence, the main parts are intact and the yield point metal can be replaced. The seismic performances of the three types of connections which include traditional connection, beam end weakened connection, and replaceable connection with low yield point steel under low cycle reciprocating load are studied. In addition, the energy dissipation capacity and damage characteristics of different connections are compared. The multiscale finite element models for the steel frames with different connections are analyzed by time-history method; both the computational efficiency and the accuracy are assured. The analysis results approve that the replaceable connection can confine the major damage in the replacement material and have better energy dissipation ability, safety reserves, and resilient ability.

  12. Remotely handled and remotely operated valve, particularly for the hot part of radioactive plants

    International Nuclear Information System (INIS)

    Radovan, G.; Sandling, M.J.; Davidson, J.W.; Blaseck, K.; Hoffmeister, L.; Westendorf, H.

    1988-01-01

    The valve consists of a valve whose valve housing is built into a pipeline. The wear parts of the valve to be replaced, such as the valve body and valve seat, are combined into a replacement part. The replacement part and a clamp act together so that the replacement part is interlocked with the valve housing in the closed operating position. The exchange can be made by undoing a single central screw. (DG) [de

  13. The spares provisioning problem with parts inventory

    OpenAIRE

    Abboud, Nadim E.

    1990-01-01

    In this research, we consider the spares provisioning problem, where a finite population of homogeneous machines are being deployed to meet a constant demand. While a machine is operating, it could become inoperable due to the failure of a critical built-in part in the machine. Before repairs on the machine can be initiated, however, a replacement part must be obtained. If a replacement part is available from stock, the machine is immediately transferred to the repair subsystem...

  14. U.S. oil-import vulnerability: The technical replacement capability

    International Nuclear Information System (INIS)

    1991-10-01

    The report examines the changes that have taken place in world oil markets and the U.S. economy since 1984 and provides revised estimates of the technical oil replacement potential that might be attained in the event of a severe and long lasting cutoff of imported oil. The analysis focuses on technologies that are commercially available today or will be within the next 5 years and that are among the most cost-effective methods for replacing oil use in applicable sectors. It also considers the economic impacts of adopting an aggressive oil replacement strategy in a severe oil emergency. The report presents a variety of policy options that could help accelerate the adoption of oil replacement technologies in preparation for, or in response to, a severe supply disruption, or as part of a long-term national policy to reduce import vulnerability. The report concludes that U.S. capability to replace lost oil imports is shrinking. Market forces alone will not be sufficient to overcome the substantial economic and social dislocations that could result from a prolonged major oil disruption

  15. Can hysterosalpingocontrast-sonography replace hysterosalpingography in the assessment of tubal subfertility?

    Science.gov (United States)

    Dijkman, A B; Mol, B W; van der Veen, F; Bossuyt, P M; Hogerzeil, H V

    2000-07-01

    Hysterosalpingo-contrastsonography (HyCoSy) is a new method for assessing tubal patency using transvaginal ultrasound. It is thought to have several advantages over conventional hysterosalpingography (HSG). We prospectively evaluated the performance of HyCoSy and HSG in the diagnosis of tubal pathology. One-hundred consecutive subfertile women underwent both HyCoSy and HSG in randomised order. Results of both tests were related to findings at laparoscopy with dye, which was used as the reference test. Each woman was asked to score the pain exsperienced at both procedures on a visual analogue scale. When laparoscopy with dye was used as reference test, the likelihood ratios of HyCoSy were slightly inferior to those obtained for HSG. Since the performance of HyCoSy was dependent on experience, the results were recalculated omitting the 50 initial procedures from the analysis. In that calculation, results of HyCoSy and HSG were comparable. There were no differences in pain experienced during the procedure, as there appeared also to be no differences in patient preferences. There appear to be no strong arguments either to replace HSG by HyCoSy, or to reject the use of HyCoSy. Both procedures can be used in the evaluation of tubal pathology.

  16. Radiological examinations of complications after total hip replacement Pt. 1

    International Nuclear Information System (INIS)

    Luzsa, Gyoergy; Reti, Peter; Lakatos, Jozsef

    1985-01-01

    The radiological findings of complications after total hip replacement are summarized by analizing the data of control examinations of the operated patients at the National Institute for Rheumatology and Physiotherapy. In this first part the types of total hip replacements and the radiological methods (native x-ray, fistulography, arthrography, needle biopsy and scintigraphy using sup(99m)Tc isotope) are surveyed, and the radiological findings of the septic surgical complications are described. (author)

  17. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; Arthroplasty - shoulder - discharge

  18. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  19. The effect of replacing lactose by starch on protein and fat digestion in milk-fed veal calves

    NARCIS (Netherlands)

    Pluschke, A.M.; Gilbert, M.S.; Williams, B.A.; Borne, van den J.J.G.C.; Schols, H.A.; Gerrits, W.J.J.

    2016-01-01

    Replacing dairy components from milk replacer (MR) with vegetable products has been previously associated with decreased protein and fat digestibility in milk-fed calves resulting in lower live weight gain. In this experiment, the major carbohydrate source in MR, lactose, was partly replaced with

  20. Environmental systems analysis of biogas systems-Part II: The environmental impact of replacing various reference systems

    International Nuclear Information System (INIS)

    Boerjesson, Pal; Berglund, Maria

    2007-01-01

    This paper analyses the overall environmental impact when biogas systems are introduced and replace various reference systems for energy generation, waste management and agricultural production. The analyses are based on Swedish conditions using a life-cycle perspective. The biogas systems included are based on different combinations of raw materials and final use of the biogas produced (heat, power and transportation fuel). A general conclusion is that biogas systems normally lead to environmental improvements, which in some cases are considerable. This is often due to indirect environmental benefits of changed land use and handling of organic waste products (e.g. reduced nitrogen leaching, emissions of ammonia and methane), which often exceed the direct environmental benefits achieved when fossil fuels are replaced by biogas (e.g. reduced emissions of carbon dioxide and air pollutants). Such indirect benefits are seldom considered when biogas is evaluated from an environmental point of view. The environmental impact from different biogas systems can, however, vary significantly due to factors such as the raw materials utilised, energy service provided and reference system replaced

  1. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  2. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  3. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... Ankle replacement surgery is most often done while you are under general anesthesia. This means you will ...

  4. Nicotine replacement therapy

    Science.gov (United States)

    Smoking cessation - nicotine replacement; Tobacco - nicotine replacement therapy ... Before you start using a nicotine replacement product, here are some things to know: The more cigarettes you smoke, the higher the dose you may need to ...

  5. Hip Replacement Surgery

    Science.gov (United States)

    ... Outreach Initiative Breadcrumb Home Health Topics English Español Hip Replacement Surgery Basics In-Depth Download Download EPUB ... PDF What is it? Points To Remember About Hip Replacement Surgery Hip replacement surgery removes damaged or ...

  6. Evaluation of depreciation costs in replacement investments of nuclear power plants

    International Nuclear Information System (INIS)

    Nakada, Shoji; Takashima, Ryuta; Nagano, Koji; Kimura, Hiroshi; Madarame, Haruki

    2010-01-01

    Replacement of nuclear power plants has the possibility of affecting the management of electric power suppliers. Therefore, in the nuclear policy, a depreciation method as an equalization method, which means that part of the investment cost is accumulated as an allowance, and after the start of operation, the depreciation cost in the replacement project is equalized, has been introduced in Japan. In this paper, we evaluate the replacement of nuclear power plants by taking into account the uncertainty of operating costs and the depreciation cost in order to examine the effect of the depreciation method on the decision criteria of the replacement.We found that the equalization method is elective for inducing the acceleration of the replacement. Furthermore, we show the relationship between the uncertainty and the depreciation method. It turns out that as uncertainty increases, the difference in investment threshold between the equalization method and the existing depreciation method decreases, and that in option value increases. (author)

  7. Lower limb joint replacement in rheumatoid arthritis

    Directory of Open Access Journals (Sweden)

    Clement Nicholas D

    2012-06-01

    Full Text Available Abstract Introduction There is limited literature regarding the peri-operative and surgical management of patients with rheumatoid disease undergoing lower limb arthroplasty. This review article summarises factors involved in the peri-operative management of major lower limb arthroplasty surgery for patients with rheumatoid arthritis. Methods We performed a search of the medical literature, using the PubMed search engine (http://www.pubmed.gov. We used the following terms: ‘rheumatoid’ ‘replacement’ ‘arthroplasty’ and ‘outcome’. Findings The patient should be optimised pre-operatively using a multidisciplinary approach. The continued use of methotrexate does not increase infection risk, and aids recovery. Biologic agents should be stopped pre-operatively due the increased infection rate. Patients should be made aware of the increased risk of infection and periprosthetic fracture rates associated with their disease. The surgical sequence is commonly hip, knee and then ankle. Cemented total hip replacement (THR and total knee replacement (TKR have superior survival rates over uncemented components. The evidence is not clear regarding a cruciate sacrificing versus retaining in TKR, but a cruciate sacrificing component limits the risk early instability and potential revision. Patella resurfacing as part of a TKR is associated with improved outcomes. The results of total ankle replacement remain inferior to THR and TKR. RA patients achieve equivalent pain relief, but their rehabilitation is slower and their functional outcome is not as good. However, the key to managing these complicated patients is to work as part of a multidisciplinary team to optimise their outcome.

  8. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  9. Can hysterosalpingocontrast-sonography replace hysterosalpingography in the assessment of tubal subfertility?

    Energy Technology Data Exchange (ETDEWEB)

    Dijkman, Antonius B.; Mol, Ben W.J.; Veen, Fulco van der; Bossuyt, P.M.M.; Hogerzeil, Hendricus V

    2000-07-01

    Introduction: Hysterosalpingo-contrastsonography (HyCoSy) is a new method for assessing tubal patency using transvaginal ultrasound. It is thought to have several advantages over conventional hysterosalpingography (HSG). We prospectively evaluated the performance of HyCoSy and HSG in the diagnosis of tubal pathology. Methods and patients: One-hundred consecutive subfertile women underwent both HyCoSy and HSG in randomised order. Results of both tests were related to findings at laparoscopy with dye, which was used as the reference test. Each woman was asked to score the pain exsperienced at both procedures on a visual analogue scale. Results: When laparoscopy with dye was used as reference test, the likelihood ratios of HyCoSy were slightly inferior to those obtained for HSG. Since the performance of HyCoSy was dependent on experience, the results were recalculated omitting the 50 initial procedures from the analysis. In that calculation, results of HyCoSy and HSG were comparable. There were no differences in pain experienced during the procedure, as there appeared also to be no differences in patient preferences. Conclusion: There appear to be no strong arguments either to replace HSG by HyCoSy, or to reject the use of HyCoSy. Both procedures can be used in the evaluation of tubal pathology.

  10. Can hysterosalpingocontrast-sonography replace hysterosalpingography in the assessment of tubal subfertility?

    International Nuclear Information System (INIS)

    Dijkman, Antonius B.; Mol, Ben W.J.; Veen, Fulco van der; Bossuyt, P.M.M.; Hogerzeil, Hendricus V.

    2000-01-01

    Introduction: Hysterosalpingo-contrastsonography (HyCoSy) is a new method for assessing tubal patency using transvaginal ultrasound. It is thought to have several advantages over conventional hysterosalpingography (HSG). We prospectively evaluated the performance of HyCoSy and HSG in the diagnosis of tubal pathology. Methods and patients: One-hundred consecutive subfertile women underwent both HyCoSy and HSG in randomised order. Results of both tests were related to findings at laparoscopy with dye, which was used as the reference test. Each woman was asked to score the pain exsperienced at both procedures on a visual analogue scale. Results: When laparoscopy with dye was used as reference test, the likelihood ratios of HyCoSy were slightly inferior to those obtained for HSG. Since the performance of HyCoSy was dependent on experience, the results were recalculated omitting the 50 initial procedures from the analysis. In that calculation, results of HyCoSy and HSG were comparable. There were no differences in pain experienced during the procedure, as there appeared also to be no differences in patient preferences. Conclusion: There appear to be no strong arguments either to replace HSG by HyCoSy, or to reject the use of HyCoSy. Both procedures can be used in the evaluation of tubal pathology

  11. Ranking hospitals for outcomes in total hip replacement - administrative data with or without additional patient surveys? - Part 1: Administrative data

    Directory of Open Access Journals (Sweden)

    Dörning, Hans

    2007-03-01

    Full Text Available Background: Many hospital rankings rely on the frequency of adverse outcomes and are based on administrative data. In the study presented here, we tried to find out, to what extent available administrative data of German Sickness Funds allow for an adequate hospital ranking and compared this with rankings based on additional information derived from a patient survey. Total hip replacement was chosen as an example procedure. In part I of the publication, we present the results of the approach based on administrative data. Methods: We used administrative data from the AOK-Lower Saxony of the years 2000, 2001 and 2002. The study population comprised all beneficiaries, who received total hip replacement in the years 2000 or 2001. Performance indicators used where “critical incident (Mortality or revision” and “number of revisions” within the first year. Hospitals were ranked if they performed at least 20 procedures on AOK-beneficiaries in each of the two years. Multivariate modelling (logistic and poisson regression was used to estimate the performance indicators by case-mix variables (age, sex, co-diagnoses and hospital characteristics (hospital size, surgical volume. The actual ranking was based on these multivariate models, excluding hospital variables and adding dummy-variables for each hospital. Hospitals were ranked by their case-mix adjusted odds ratio or SMR respectively with respect to a pre-selected reference hospital. The resulting rankings were compared with each other, with regard to temporal stability, and the impact of case-mix variables.Results: About 4500 beneficiaries received total hip replacement in each year (n2000: 4482; n2001: 4579. The ranking included 65 hospitals. Comparing the years 2000 and 2001, the temporal stability of the rankings based on a single performance indicator was low (Spearman rang correlation coefficients 0.158 and 0.191. The agreement of rankings based on different performance indicators in the

  12. Can we omit scintiscanning of the skeleton in follow-up aftercare of carcinoma of the breast. A prospective study of 630 cases. Ist die Skelettszintigraphie in der Nachsorge des Mammakarzinoms entbehrlich. Eine prospektive Studie ueber 630 Faelle

    Energy Technology Data Exchange (ETDEWEB)

    Schuenemann, H [Onkologische Klinik Bad Trissl, Oberaudorf (Germany, F.R.)

    1989-08-01

    630 women patients of the Bad Trissl clinic were admitted in 1987/88 to a prospective study to find out whether scintiscanning, or radionuclide imaging, of the skeleton can be omitted completely or in part in the after care and follow-up of carcinoma of the breast. The initial criterion was a postoperative carcinoma of the breast without metastasizing in the skeleton at the time the study began or the patient was admitted to the study. Careful pain anamnesis was performed by means of prepared questions, and a detailed clinical examination conducted to detect any pain in the skeleton of the patient concerned. This was followed by whole body scintiscanning of the skeleton and complementary X-ray films, if necessary additional examinations. It was found that clinical findings and imaging methods agreed in 545 patients. In 55 cases a finding that was clinically suspicious of metastases or doubtful, could be refuted by both scintiscan and by X-ray, osseous metastasizing would have been overlooked without skeleton scintiscan in 14 patients only (2.2%), 11 of these 14 patients were high-risk patients (negative hormonal receptor status, axillary lymph node metastases). Hence, it will be sufficient to employ scintiscanning in the aftercare and follow-up of carcinoma of the breast on a risk-adapted basis provided this is preceded by careful pain analysis and clinical examination. Failure to detect metastasizing in the skeleton will then occur in only 3 of 630 patients (0.48%). In this manner 40% of scintiscans can be omitted in future. (orig.).

  13. Omitting duodenal biopsy in children with suspected celiac disease and extra-intestinal symptoms.

    Science.gov (United States)

    Bozzola, Mauro; Meazza, Cristina; Gertosio, Chiara; Pagani, Sara; Larizza, Daniela; Calcaterra, Valeria; Luinetti, Ombretta; Farello, Giovanni; Tinelli, Carmine; Iughetti, Lorenzo

    2017-07-15

    The aim of our study is to evaluate if in children with highly positive serology and HLA-DQ2/DQ8 (triple test, TT) and only extra-intestinal symptoms, it is possible to omit performing an intestinal biopsy for celiac disease (CD) diagnosis, as suggested by the new European Society for Pediatric Gastroenterology, Hepatology and Nutrition ESPGHAN guidelines. In this retrospective study a total of 105 patients, suspected of having CD because of extra-intestinal symptoms and showing serum tissue transglutaminase antibody (anti-tTG) and anti-endomysial antibody (EMA) measurements and HLA genotyping, were considered for the final analysis (33 boys and 72 girls; age range 1.5-17.6 years). Histological findings confirmed diagnosis of CD in 97 (92.4%) patients. Forty-one patients (39%) showed anti-tTG >10 times normal values, positive EMA and positive HLA-DQ2/DQ8 (positive TT). All of them had a diagnosis of CD, therefore there were no false positive cases. Sixty-four patients were negative for the TT. In eight cases, CD was ruled out and these were considered true negative cases. In the remaining 56 negative TT patients, intestinal biopsy confirmed CD diagnosis and they were considered false negatives. Based on these results, specificity for the TT was 100% and sensitivity was 42.3%. On the basis of the present study, diagnosis of CD can be reliably performed without a duodenal biopsy in children with only extra-intestinal symptoms.

  14. U.S. oil import vulnerability: The technical replacement capability. Summary

    International Nuclear Information System (INIS)

    1991-10-01

    The report examines the changes that have taken place in world oil markets and the U.S. economy since 1984 and provides revised estimates of the technical oil replacement potential that might be attained in the event of a severe and long lasting cutoff of imported oil. The analysis focuses on technologies that are commercially available today or will be within the next 5 years and that are among the most cost-effective methods for replacing oil use in applicable sectors. It also considers the economic impacts of adopting an aggressive oil replacement strategy in a severe oil emergency. The report presents a variety of policy options that could help accelerate the adoption of oil replacement technologies in preparation for, or in response to, a severe supply disruption, or as part of a long-term national policy to reduce import vulnerability. The report's conclusion that U.S. capability to replace lost oil imports is shrinking should be sobering to those who believe that there are quick and easy technological solutions, or that market forces alone will be sufficient to overcome the substantial economic and social dislocations that could result from a prolonged major oil disruption

  15. Absorber rod drive for nuclear reactors

    International Nuclear Information System (INIS)

    Acher, H.

    1985-01-01

    The invention concerns a further addition to the invention of DE 33 42 830 A1. The free contact of the hollow piston with the nut due to hydraulic pressure is replaced by a hydraulic or spring attachment. The pressure system required to produce the hydraulic pressure is therefore omitted, and the electrical power required for driving the pump or the mass flow is also omitted. The absorber rod slotted along its longitudinal axis is replaced by an absorber rod, in the longitudinal axis of which a hollow piston is connected together with the absorber rod. This makes the absorber rod more stable, and assembly is simplified. (orig./HP) [de

  16. Flow boiling test of GDP replacement coolants

    International Nuclear Information System (INIS)

    Park, S.H.

    1995-01-01

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C 4 F 10 and C 4 F 8 , were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C 4 F 10 mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C 4 F 10 weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd

  17. Defining line replaceable units

    NARCIS (Netherlands)

    Parada Puig, J. E.; Basten, R. J I

    2015-01-01

    Defective capital assets may be quickly restored to their operational condition by replacing the item that has failed. The item that is replaced is called the Line Replaceable Unit (LRU), and the so-called LRU definition problem is the problem of deciding on which item to replace upon each type of

  18. Gate replacement at the Upper Lake Falls development

    International Nuclear Information System (INIS)

    Chen, C.T.; Locke, A.E.; Brown, E.R.

    1998-01-01

    Nova Scotia Power's integrated approach to dam safety was discussed. One of the two intake gates at Unit 1 of the Upper Falls Power Plant on the Mersey River was replaced in 1997 as part of the Utility's upgrading program. In the event of governor failure or turbine runaway, the new roller gate will allow operators to close the original sliding gate first under a more-or-less balanced head condition, and then to close the new roller gate under a full-flow condition. The planning, design and construction of the new roller gate is described. One of the two head gates of Unit 2 at the same station will be replaced in a similar fashion in the fall of 1998. 4 refs., 7 figs

  19. Qualification and Certification of 3D Printed Parts for Naval Ships

    Science.gov (United States)

    2017-12-01

    the realm of replacement parts. More specifically, replacement parts that are no longer made or are out of stock and have long wait times are showing...some preliminary findings. While NAVFAC’s work in 2015 focused on investigating, “the end to end processes of transferring, receiving, manipulating

  20. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  1. Transcatheter aortic valve replacement

    Science.gov (United States)

    ... gov/ency/article/007684.htm Transcatheter aortic valve replacement To use the sharing features on this page, please enable JavaScript. Transcatheter aortic valve replacement (TAVR) is surgery to replace the aortic valve. ...

  2. Replacement of the glove box panel in nuclear fuel reprocessing facility

    International Nuclear Information System (INIS)

    Yamamoto, Masahiko; Shirouzu, Hidetomo; Mori, Eito; Surugaya, Naoki

    2016-05-01

    The panels for visual confirmation of glove box installed at Operation Testing Laboratory in Tokai Reprocessing Plant have been deteriorated and transparencies have been decreased due to the long-term use. Therefore, the glove box panels have been replaced from the view point of preventive maintenance. In the new regulation formulated since the accident at Tokyo Electric Power Company's Fukushima Daiichi Nuclear Power Station, it is demanded that the glove box consists of incombustible or noncombustible materials. In this replacement, the new panels have been manufactured with the polycarbonate which satisfied the UL94 V-0 incombustible class. The glove box has been in service for 40 years and its inside is contaminated with radioactive materials. Thus, the contaminations have been investigated and decontaminated before the replacement work. Then, operator's exposure and radiation protection equipment have been estimated. Also, it is necessary to replace the panels with maintaining the glove box's enclosure function. The replacement has been conducted in closed space covering the opening parts with vinyl sheets. The enclosure function has been verified by the inspection of the new panels and glove box. (author)

  3. Effect of Cement Replacement with Carbide Waste on the Strength of Stabilized Clay Subgrade

    Directory of Open Access Journals (Sweden)

    Muntohar A.S.

    2016-03-01

    Full Text Available Cement is commonly used for soil stabilization and many other ground improvement techniques. Cement is believed to be very good to improve the compressive and split-tensile strength of clay subgrades. In some application cement could be partly or fully replaced with carbide waste. This research is to study the effectiveness of the cement replacement and to find the maximum carbide waste content to be allowed for a clay subgrade. The quantities of cement replaced with the carbide waste were 30, 50, 70, 90, and 100% by its mass. The results show that replacing the cement with carbide waste decreased both the compressive and split tensile strength. Replacing cement content with carbide waste reduced its ability for stabilization. The carbide waste content should be less than 70% of the cement to provide a sufficient stabilizing effect on a clay subgrade.

  4. Risk factors for urinary retention after hip or knee replacement: a cohort study

    OpenAIRE

    Griesdale, Donald E. G.; Neufeld, Jeremy; Dhillon, Dale; Joo, Jennifer; Sandhu, Supna; Swinton, Frank; Choi, Peter T.

    2011-01-01

    Introduction In 2006, our provincial government initiated a program to reduce wait times for total hip or knee replacements by referring patients to a single tertiary-care centre. This program provided an opportunity to identify risk factors for perioperative complications as part of a continuing quality improvement project. We report the risk of postoperative urinary retention after hip and knee replacements and the risk factors associated with this complication. Methods After local Research...

  5. Use of seismic experience data for technical evaluation of commercial grade replacement items

    International Nuclear Information System (INIS)

    Cushing, R.W.; Campbell, R.D.

    1991-01-01

    This paper reports that the purchase of commercial grade replacement items which are dedicated for use in nuclear safety related systems requires a technical evaluation for those items which cannot be purchased as like-for-like replacements. One of the requirements for performing a technical evaluation is verification of seismic adequacy. Studying the performance and failure modes of equipment which has been subjected to strong motion earthquakes has provided the industry with the ability to predict the behavior characteristics of many types of commonly replaced components and parts. The use of Seismic Experience Data has developed into an efficient means of satisfying the seismic adequacy requirement

  6. Ankle replacement - discharge

    Science.gov (United States)

    ... total - discharge; Total ankle arthroplasty - discharge; Endoprosthetic ankle replacement - discharge; Osteoarthritis - ankle ... You had an ankle replacement. Your surgeon removed and reshaped ... an artificial ankle joint. You received pain medicine and were ...

  7. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  8. replacement of the heart of the CMS experiment - the pixel #detector. Part2

    CERN Multimedia

    Brice, Maximilien

    2017-01-01

    This week, one of the Large Hadron Collider’s experiments gets a “heart transplant”. --- Physicists and engineers are replacing the heart of the CMS experiment - the pixel #detector. This will improve CMS’s ability to make precise measurements on aspects of the Standard Model, including the properties of the #HiggsBoson. The #LHC and its experiments are currently preparing to wake up this spring, when the accelerator will begin to collide particles once more at close to the speed of light. --- Today at 12:15 CET, join us live on #Facebook and ask us anything: https://www.facebook.com/cern/

  9. Patients Unicondylar Knee Replacement vs. Total Knee Replacement

    OpenAIRE

    Hedra Eskander

    2017-01-01

    The aim of this review article is to analyse the clinical effectiveness of total knee replacement (TKR) compared to unicondylar knee replacement (UKR) on patients. In terms of survival rates, revision rates and postoperative complications. The keywords used were: knee arthroplasty. Nearly three thousand articles were found on 25 August 2016. Of those, only twenty-five were selected and reviewed because they were strictly focused on the topic of this article. Compared with those who have TKR, ...

  10. Artificial Disc Replacement

    Science.gov (United States)

    ... Spondylolisthesis BLOG FIND A SPECIALIST Treatments Artificial Disc Replacement (ADR) Patient Education Committee Jamie Baisden The disc ... Disc An artificial disc (also called a disc replacement, disc prosthesis or spine arthroplasty device) is a ...

  11. Effect of Replacing Sugar with Non-Caloric Sweeteners in Beverages on the Reward Value after Repeated Exposure

    NARCIS (Netherlands)

    Griffioen-Roose, S.; Smeets, P.A.M.; Weijzen, P.L.G.; Rijn, van I.; Bosch, van den I.; Graaf, de C.

    2013-01-01

    Background: The reward value of food is partly dependent on learned associations. It is not yet known whether replacing sugar with non-caloric sweeteners in food is affecting long-term acceptance. Objective: To determine the effect of replacing sugar with non-caloric sweeteners in a nutrient-empty

  12. Omitting cytogenetic assessment from routine treatment response monitoring in chronic myeloid leukemia is safe.

    Science.gov (United States)

    Geelen, Inge G P; Thielen, Noortje; Janssen, Jeroen J W M; Hoogendoorn, Mels; Roosma, Tanja J A; Valk, Peter J M; Visser, Otto; Cornelissen, Jan J; Westerweel, Peter E

    2018-04-01

    The monitoring of response in chronic myeloid leukemia (CML) is of great importance to identify patients failing their treatment in order to adjust TKI choice and thereby prevent progression to advanced stage disease. Cytogenetic monitoring has a lower sensitivity, is expensive, and requires invasive bone marrow sampling. Nevertheless, chronic myeloid leukemia guidelines continue to recommend performing routine cytogenetic response assessments, even when adequate molecular diagnostics are available. In a population-based registry of newly diagnosed CML patients in the Netherlands, all simultaneous cytogenetic and molecular assessments performed at 3, 6, and 12 months were identified and response of these matched assessments was classified according to European Leukemia Net (ELN) recommendations. The impact of discrepant cytogenetic and molecular response classifications and course of patients with additional chromosomal abnormalities were evaluated. The overall agreement of 200 matched assessments was 78%. In case of discordant responses, response at 24 months was consistently better predicted by the molecular outcome. Cytogenetic response assessments provided relevant additional clinical information only in some cases of molecular "warning." The development of additional cytogenetic abnormalities was always accompanied with molecular failure. We conclude that it is safe to omit routine cytogenetics for response assessment during treatment and to only use molecular monitoring, in order to prevent ambiguous classifications, reduce costs, and reduce the need for invasive bone marrow sampling. Cytogenetic re-assessment should still be performed when molecular response is suboptimal. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  13. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    . To shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega...... replacement was chosen in each company. Findings – The study shows that platform replacements primarily challenge managers' existing knowledge about platform architectures. A distinction can be made between “width” and “height” in platform replacements, and it is crucial that managers observe this in order...... to challenge their existing knowledge about platform architectures. Issues on technologies, architectures, components and processes as well as on segments, applications and functions are identified. Practical implications – Practical implications are summarized and discussed in relation to a framework...

  14. Life cycle assessment: Existing building retrofit versus replacement

    Science.gov (United States)

    Darabi, Nura

    The embodied energy in building materials constitutes a large part of the total energy required for any building (Thormark 2001, 429). In working to make buildings more energy efficient this needs to be considered. Integrating considerations about life cycle assessment for buildings and materials is one promising way to reduce the amount of energy consumption being used within the building sector and the environmental impacts associated with that energy. A life cycle assessment (LCA) model can be utilized to help evaluate the embodied energy in building materials in comparison to the buildings operational energy. This thesis takes into consideration the potential life cycle reductions in energy and CO2 emissions that can be made through an energy retrofit of an existing building verses demolition and replacement with a new energy efficient building. A 95,000 square foot institutional building built in the 1960`s was used as a case study for a building LCA, along with a calibrated energy model of the existing building created as part of a previous Masters of Building Science thesis. The chosen case study building was compared to 10 possible improvement options of either energy retrofit or replacement of the existing building with a higher energy performing building in order to see the life cycle relationship between embodied energy, operational energy, and C02 emissions. As a result of completing the LCA, it is shown under which scenarios building retrofit saves more energy over the lifespan of the building than replacement with new construction. It was calculated that energy retrofit of the chosen existing institutional building would reduce the amount of energy and C02 emissions associated with that building over its life span.

  15. Time Series Forecasting with Missing Values

    OpenAIRE

    Shin-Fu Wu; Chia-Yung Chang; Shie-Jue Lee

    2015-01-01

    Time series prediction has become more popular in various kinds of applications such as weather prediction, control engineering, financial analysis, industrial monitoring, etc. To deal with real-world problems, we are often faced with missing values in the data due to sensor malfunctions or human errors. Traditionally, the missing values are simply omitted or replaced by means of imputation methods. However, omitting those missing values may cause temporal discontinuity. Imputation methods, o...

  16. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  17. Guideline for the seismic technical evaluation of replacement items for nuclear power plants

    International Nuclear Information System (INIS)

    Harris, S.P.; Cushing, R.W.; Johnson, H.W.; Abeles, J.M.

    1993-02-01

    Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included

  18. Rationalizing method of replacement intervals by using Bayesian statistics

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Kusakari, Yoshiyuki

    2007-01-01

    This study represents the formulations for rationalizing the replacement intervals of equipments and/or parts taking into account the probability density functions (PDF) of the parameters of failure distribution functions (FDF) and compares the optimized intervals by our formulations with those by conventional formulations which uses only representative values of the parameters of FDF instead of using these PDFs. The failure data are generated by Monte Carlo simulations since the real failure data can not be available for us. The PDF of PDF parameters are obtained by Bayesian method and the representative values are obtained by likelihood estimation and Bayesian method. We found that the method using PDF by Bayesian method brings longer replacement intervals than one using the representative of the parameters. (author)

  19. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  20. Optimization of steam generator replacement with virtual reality modeling

    International Nuclear Information System (INIS)

    Kim, Jeong H.; Suh, Kune Y.

    2008-01-01

    Nuclear power plants (NPPs) have to be carefully examined and maintained up to the point of replacing major components during the overhaul period for continued operation. Most understandably the cost of maintenance and upgrading will tend to increase with the NPP power. There is thus an escalating need for developing an optimized process management method to reduce the cost involved. Albeit the steam generators (SGs) may not directly affect the expected lifespan of NPP, thousands of tubes with diameter on the order of 3 cm in the SG operating at 320degC and 16 MPa may well tend to be called Achilles' heel of the pressurized water reactors (PWRs). For instance, the SGs of Kori Nuclear Unit 1 (KNU 1) were replaced in October 1998 after 20 years of service on account of aging and potential threat to operational safety. In the same year the SG tubes of Ulchin Nuclear Units 1 and 2 were ruptured to result in leakage of the primary coolant to the secondary side. As a result their SGs are planned to be replaced in a few years. There is, however, a limit to improving the replacement process by trial and error in practice on account of the size of NPP with the ensuing complexity in process management. This paper proposes an optimization method for the SG replacement process based on the KNU 1 experience in 1998. The whole process was simulated accounting for interactions of each part in virtual reality utilizing the computer aided design solution CATIA, and the digital process management solution DELMIA. (author)

  1. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  2. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  3. Setting the optimal type of equipment to be adopted and the optimal time to replace it

    OpenAIRE

    Albici, Mihaela

    2009-01-01

    The mathematical models of equipment’s wear and tear, and replacement theory aim at deciding on the purchase selection of a certain equipment type, the optimal exploitation time of the equipment, the time and ways to replace or repair it, or to ensure its spare parts, the equipment’s performance in the technical progress context, the opportunities to modernize it etc.

  4. Pipe replacement in a water supply network: coordinated versus uncoordinated replacement and budget effects

    NARCIS (Netherlands)

    Dijk, van D.; Hendrix, E.M.T.

    2016-01-01

    Operators of underground water supply networks are challenged with pipe replacement
    decisions, because pipes are subject to increased failure rates as they age and financial resources
    are often limited.We study the optimal replacement time and optimal number of pipe replacements
    such

  5. Simulation of an integrated age replacement and spare provisioning policy using SLAM

    International Nuclear Information System (INIS)

    Zohrul Kabir, A.B.M.; Farrash, S.H.A.

    1996-01-01

    This paper presents a SLAM simulation model for determining a jointly optimal age replacement and spare part provisioning policy. The policy, referred to as a stocking policy, is formulated by combining age replacement policy with a continuous review (s, S) type inventory policy, where s is the stock reorder level and S is the maximum stock level. The optimal values of the decision variables are obtained by minimizing the total cost of replacement and inventory. The simulation procedure outlined in the paper can be used to model any operating situation having either a single item or a number of identical items. Results from a number of case problems specifically constructed by 5-factor second order rotatory design have been presented and the effects of different cost elements, item failure characteristics and lead time characteristics have been highlighted. For all case problems, optimal (s, S) policies to support the Barlow-Proschan age policy have also been determined. Simulation results clearly indicate the separate optimizations of replacement and spare provisioning policies do not ensure global optimality when total system cost has to be minimized

  6. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. Hydrothermal replacement of calcite by Mg-carbonates

    Science.gov (United States)

    Jonas, Laura; Mueller, Thomas; Dohmen, Ralf

    2014-05-01

    The transport of heat and mass through the Earth's crust is coupled to mineral reactions and the exchange of isotopes and elements between different phases. Carbonate minerals are a major constituent of the Earth's crust and play an important role in different physical, chemical and even biological processes. In this experimental study, the element exchange reaction between calcite (CaCO3) and a Mg-rich fluid phase is investigated under hydrothermal conditions. Single crystals of calcite (2x2x2 mm) react with 1 ml of a 1 M MgCl2 solution at 200° C in a Teflon-lined steel autoclave for different times between one day and four weeks. The reaction leads to the formation of a porous reaction front and the pseudomorphic replacement of calcite by dolomite [CaMg(CO3)2] and magnesite (MgCO3). Scanning electron microscopy revealed that the reaction rim consists of small Mg-carbonate rhombs closely attached to each other, suggesting that the replacement reaction takes place by a dissolution-precipitation mechanism. Typically, the observed reaction front can be divided into two different domains. The outer part of the reaction rim, i.e. from the mineral surface in contact to the fluid inwards, consists of magnesite, whereas the inner part of the rim surrounding the unreacted calcite core consists of Ca-rich dolomite. The formation of a porous microstructure that varies in different parts of the reaction rim is a direct result of the large molar volume change induced by the replacement of calcite by magnesite and dolomite. The developing porosity therefore creates fluid pathways that promote the progress of the reaction front towards the unreacted core of the single crystal. Compositional profiles measured perpendicular to the mineral surface across the reactions rims using electron microprobe (EMPA) further revealed a compositional gradient within the reaction rim with regard to the structure-forming elements Mg and Ca. Here, the amount of Mg incorporated in both product

  8. Hip Replacement: MedlinePlus Health Topic

    Science.gov (United States)

    ... invasive hip replacement (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hip Replacement updates ... replacement - precautions Minimally invasive hip replacement Related Health Topics Hip Injuries and Disorders National Institutes of Health ...

  9. Aorto-right atrial fistula after ascending aortic replacement or aortic value replacement

    International Nuclear Information System (INIS)

    Zhi Aihua; Dai Ruping; Jiang Shiliang; Lu Bin

    2012-01-01

    Objective: To evaluate the CT features of aorto-right atrial fistula after aortic valve replacement (AVR) or ascending aortic replacement. Methods: Eighty-seven patients with aortic-right atrial fistula underwent CT after operation. The CT features were retrospectively analyzed. Fistula was measured according to maximum width of the shunt. Results: Aorto-right atrial fistula was detected in 87 patients after aortic valve replacement or ascending aortic replacement by CT scan. Among them, 25 patients were diagnosed as mild aorto-right atrial fistula, 47 patients as moderate, and 15 patients as severe. Thirty-seven patients underwent follow-up CT.Among them, 10 patients with mild to moderate aorto-right atrial fistula were considered to have complete regression, 8 patients with mild aorto-right atrial fistula considered to have incomplete regression, 14 patients with mild to moderate aorto-right atrial fistula considered to have stable condition, and 5 patients with moderate aorto-right atrial fistula considered to have progression at the 3-month follow-up. Conclusion: CT is a useful tool for defining aorto-right atrial fistula after AVR or ascending aortic replacement and for evaluating it in follow-up. (authors)

  10. Ultrasonic aqueous cleaning as a replacement for chlorinated solvent cleaning

    International Nuclear Information System (INIS)

    Thompson, L.M.; Simandl, R.F.

    1992-01-01

    The Oak Ridge Y-12 Plant has been involved in the replacement of chlorinated solvents since 1982. One of the most successful replacement efforts has been the substitution of vapor degreasers or soak tanks using chlorinated solvents with ultrasonic cleaning using aqueous detergents. Recently, funding was obtained from the Department of Energy Office (DOE) of Technology Development to demonstrate this technology. A unit has been procured and installed in the vacuum pump shop area to replace the use of a solvent soak tank. Initially, the solvents used in the shop were CFC-113 and a commercial brand cleaner which contained both perchloroethylene and methylene chloride. While the ultrasonic unit was being procured, a terpene-based solvent was used. Generally, parts were soaked overnight in order to soften baked-on vanish. Many times, wire brushing was used to help remove remaining contamination. Initial testing with the ultrasonic cleaner indicated cleaning times of 20 min were as effective as the overnight solvent soaks in removing contamination. Wire brushing was also not required following the ultrasonic cleaning as was sometimes required with the solvent soak

  11. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy...... operations were completed as mini-sternotomies, 4 died later of noncardiac causes. The aortic cross-clamp and perfusion times were significantly different across all groups (P replacement...... is an excellent operation in selected patients, but its true advantages over conventional aortic valve replacement (other than a smaller scar) await evaluation by means of randomized clinical trial. The "extended mini-aortic valve replacement" operation, on the other hand, is a risky procedure that should...

  12. RIVM ZZS-2-BIO project : the biobased replacement potential of hazardous substances

    NARCIS (Netherlands)

    Es, van D.S.

    2014-01-01

    A quick scan of the ZZS (zeer zorgwekkende stoffen) list of 371 substances of very high concern shows that there is significant potential in biobased replacement of part of the list. It is shown that in many cases easily implementable biobased alternatives are already available or in advanced stages

  13. Risk of fracture in adults on renal replacement therapy

    DEFF Research Database (Denmark)

    Hansen, Ditte; Olesen, Jonas B; Gislason, Gunnar H

    2016-01-01

    BACKGROUND: Patients on dialysis treatment or living with a transplanted kidney have several risk factors for bone fracture, especially disturbances in mineral metabolism and immunosuppressive therapy. We describe the incidence of fracture in this retrospective national Danish cohort study and ex....... Differences in age, gender, drug use and comorbidity only partly explain this increased risk. Further studies are warranted to explore the reason for this increased fracture risk in patients on renal replacement therapy....

  14. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series—Normal anatomy To use the sharing ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  15. 24 CFR 891.405 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.405....405 Replacement reserve. (a) Establishment of reserve. The Owner shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance and repair and replacement of capital items...

  16. Remotely handled and remotely operated valve, particularly for the hot part of radioactive plants. Fernhantierbare und fernbedienbare Armatur, insbesondere fuer den heissen Bereich radioaktiver Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Radovan, G.; Sandling, M.J.; Davidson, J.W.; Blaseck, K.; Hoffmeister, L.; Westendorf, H.

    1988-01-21

    The valve consists of a valve whose valve housing is built into a pipeline. The wear parts of the valve to be replaced, such as the valve body and valve seat, are combined into a replacement part. The replacement part and a clamp act together so that the replacement part is interlocked with the valve housing in the closed operating position. The exchange can be made by undoing a single central screw.

  17. Revising ecological assumptions about Human papillomavirus interactions and type replacement.

    Science.gov (United States)

    Murall, Carmen Lía; McCann, Kevin S; Bauch, Chris T

    2014-06-07

    The controversy over whether vaccine-targeted HPV types will be replaced by other oncogenic, non-vaccine-targeted types remains unresolved. This is in part because little is known about the ecology of HPV types. Patient data has been interpreted to suggest independence or facilitative interactions between types and therefore replacement is believed to be unlikely. With a novel mathematical model, we investigated which HPV type interactions and their immune responses gave qualitatively similar patterns frequently observed in patients. To assess the possibility of type replacement, vaccination was added to see if non-vaccine-targeted types increased their 'niche'. Our model predicts that independence and facilitation are not necessary for the coexistence of types inside hosts, especially given the patchy nature of HPV infection. In fact, independence and facilitation inadequately represented co-infected patients. We found that some form of competition is likely in natural co-infections. Hence, non-vaccine-targeted types that are not cross-reactive with the vaccine could spread to more patches and can increase their viral load in vaccinated hosts. The degree to which this happens will depend on replication and patch colonization rates. Our results suggest that independence between types could be a fallacy, and so without conclusively untangling HPV within-host ecology, type replacement remains theoretically viable. More ecological thinking is needed in future studies. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. 24 CFR 891.855 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserves. 891.855... § 891.855 Replacement reserves. (a) The mixed-finance owner shall establish and maintain a replacement... the funds will be used to pay for capital replacement costs for the Section 202 or 811 supportive...

  19. Compressive strength of concrete by partial replacement of cement with metakaolin

    Science.gov (United States)

    Ganesh, Y. S. V.; Durgaiyya, P.; Shivanarayana, Ch.; Prasad, D. S. V.

    2017-07-01

    Metakaolin or calcined kaolin, other type of pozzolan, produced by calcination has the capability to replace silica fume as an alternative material. Supplementary cementitious materials have been widely used all over the world in concrete due to their economic and environmental benefits; hence, they have drawn much attention in recent years. Mineral admixtures such as fly ash, rice husk ash, silica fume etc. are more commonly used SCMs. They help in obtaining both higher performance and economy. Metakaolin is also one of such non - conventional material, which can be utilized beneficially in the construction industry. This paper presents the results of an experimental investigations carried out to find the suitability of metakaolin in production of concrete. In the present work, the results of a study carried out to investigate the effects of Metakaolin on compressive strength of concrete are presented. The referral concrete M30 was made using 43 grade OPC and the other mixes were prepared by replacing part of OPC with Metakaolin. The replacement levels were 5%, 10%, 15% and 20%(by weight) for Metakaolin. The various results, which indicate the effect of replacement of cement by metakalion on concrete, are presented in this paper to draw useful conclusions.

  20. 25 CFR 700.53 - Dwelling, replacement.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Dwelling, replacement. 700.53 Section 700.53 Indians THE... Policies and Instructions Definitions § 700.53 Dwelling, replacement. The term replacement dwelling means a dwelling selected by the head of a household as a replacement dwelling that meets the criteria of this...

  1. Could wind replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    This article aims at assessing the situation produced by a total replacement of nuclear energy by wind energy, while facing consumption demand at any moment, notably in December. The authors indicate the evolution of the French energy mix during December 2016, and the evolution of the rate between wind energy production and the sum of nuclear and wind energy production during the same month, and then give briefly some elements regarding necessary investments in wind energy to wholly replace nuclear energy. According to them, such a replacement would be ruinous

  2. Counseling patients on facial volume replacement and adherence with posttreatment instructions

    Directory of Open Access Journals (Sweden)

    Doris Day

    2010-07-01

    Full Text Available Doris DayDay Dermatology and Aesthetics New York, USAAbstract: Use of injectable volume replacement products has increased dramatically in the US in recent years. An optimal outcome with volume replacement depends on a thorough ­knowledge of the products on the part of the dermatologic/aesthetic physician specialist, identification of patients with a likelihood of benefiting from volume replacement procedures, selection of an appropriate product for the individual patient, and effective patient counseling to ensure adherence to posttreatment care instructions. Adherence to physician instructions in the field of dermatology appears limited, and there is very little published information on adherence to physician instructions following facial volume replacement procedures. The purpose of this review is to provide strategies for understanding and overcoming the barriers to adherence with the widely used dermal fillers. Strategies include using patient-centered techniques, such as a motivational interview encouraging the patient to follow postprocedure care instructions, eg, massage. In this case, demonstrating massage techniques while the patient is still in the office, with patient participation and detailed feedback, also contributes to good adherence with posttreatment care instructions. Telephone counseling, reminder postcards, and text messages may help improve clinic attendance for follow-up. Motivated patients who demonstrate good ­adherence to physician instructions generally respond well to volume replacement treatments, and usually experience fewer adverse events than patients who do not follow instructions. Although promoting adherence to pretreatment and posttreatment protocols remains a challenge, patient counseling throughout the treatment process can lead to successful results.Keywords: improving adherence, injectable volume replacement, product selection, ­rejuvenation procedure, soft tissue augmentation

  3. Carbohydrates as Fat Replacers.

    Science.gov (United States)

    Peng, Xingyun; Yao, Yuan

    2017-02-28

    The overconsumption of dietary fat contributes to various chronic diseases, which encourages attempts to develop and consume low-fat foods. Simple fat reduction causes quality losses that impede the acceptance of foods. Fat replacers are utilized to minimize the quality deterioration after fat reduction or removal to achieve low-calorie, low-fat claims. In this review, the forms of fats and their functions in contributing to food textural and sensory qualities are discussed in various food systems. The connections between fat reduction and quality loss are described in order to clarify the rationales of fat replacement. Carbohydrate fat replacers usually have low calorie density and provide gelling, thickening, stabilizing, and other texture-modifying properties. In this review, carbohydrates, including starches, maltodextrins, polydextrose, gums, and fibers, are discussed with regard to their interactions with other components in foods as well as their performances as fat replacers in various systems.

  4. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  5. Can photovoltaic replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    As the French law on energy transition for a green growth predicts that one third of nuclear energy production is to be replaced by renewable energies (wind and solar) by 2025, and while the ADEME proposes a 100 per cent renewable scenario for 2050, this paper proposes a brief analysis of the replacement of nuclear energy by solar photovoltaic energy. It presents and discusses some characteristics of photovoltaic production: production level during a typical day for each month (a noticeable lower production in December), evolution of monthly production during a year, evolution of the rate between nuclear and photovoltaic production. A cost assessment is then proposed for energy storage and for energy production, and a minimum cost of replacement of nuclear by photovoltaic is assessed. The seasonal effect is outlined, as well as the latitude effect. Finally, the authors outline the huge cost of such a replacement, and consider that public support to new photovoltaic installations without an at least daily storage mean should be cancelled

  6. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  7. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 1. Main report

    International Nuclear Information System (INIS)

    1998-07-01

    The Draft Environmental Impact Statement (EIS) for the replacement of the Australian Research reactor has been released. An important objective of the EIS process is to ensure that all relevant information has been collected and assessed so that the Commonwealth Government can make an informed decision on the proposal. The environmental assessment of the proposal to construct and operate a replacement reactor described in the Draft EIS has shown that the scale of environmental impacts that would occur would be acceptable, provided that the management measures and commitments made by ANSTO are adopted. Furthermore, construction and operation of the proposed replacement reactor would result in a range of benefits in health care, the national interest, scientific achievement and industrial capability. It would also result in a range of benefits derived from increased employment and economic activity. None of the alternatives to the replacement research reactor considered in the Draft EIS can meet all of the objectives of the proposal. The risk from normal operations or accidents has been shown to be well within national and internationally accepted risk parameters. The dose due to reactor operations would continue to be small and within regulatory limits. For the replacement reactor, the principle of 'As Low As Reasonably Achievable' would form an integral part of the design and licensing process to ensure that doses to operators are minimized. Costs associated with the proposal are $286 million (in 1997 dollars) for design and construction. The annual operating and maintenance costs are estimated to be $12 million per year, of which a significant proportion will be covered by commercial activities. The costs include management of the spent fuel from the replacement reactor as well as the environmental management costs of waste management, safety and environmental monitoring. Decommissioning costs for the replacement reactor would arise at the end of its lifetime

  8. Point Lepreau refurbishment project programmable digital comparator (PDC) replacement for SDS1 and SDS2

    International Nuclear Information System (INIS)

    Ichiyen, N.M.; Chan, D.; Thompson, P.D.

    2003-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) starting in April 2007. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the PDCs (Programmable Digital Comparators) for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the activities that have taken place in the Phase 2 ESA program as well as the plan for future work for the PDC replacement for SDS 1 (Shutdown System Number One) and SDS2 (Shutdown System Number Two). (author)

  9. Replacement names and nomenclatural comments for problematic species-group names in Europe's Neogene freshwater Gastropoda. Part 2

    Directory of Open Access Journals (Sweden)

    Thomas Neubauer

    2014-07-01

    Full Text Available In the course of a new database project on Miocene to Recent freshwater gastropods of Europe, a great many of primary and secondary homonyms were revealed. Such nomenclatural issues need clarification in order to avoid misunderstandings and wrong statements about geographical distributions and temporal ranges. The following 16 new names are introduced to replace existing homonyms: Theodoxus militaris jurisicpolsakae nom. n., Viviparus stevanovici nom. n., Melanopsis haueri ripanjensis nom. n., Melanopsis wolfgangfischeri nom. n., Micromelania ramacanensis nom. n., Pseudamnicola welterschultesi nom. n., Muellerpalia haszprunari nom. n., Muellerpalia pseudovalvatoides nom. n., Lithoglyphus gozhiki nom. n., Valvata heidemariae willmanni nom. n., Radix macaleti nom. n., Gyraulus okrugljakensis nom. n., Gyraulus rasseri nom. n., Gyraulus vrapceanus nom. n., Planorbarius halavatsi nom. n., and Segmentina mosbachensis nom. n. Additionally, six cases of homonyms are discussed that are not replaced by new names, because they are considered junior synonyms.

  10. Expediting the transition from replacement medicine to tissue engineering.

    Science.gov (United States)

    Coury, Arthur J

    2016-06-01

    In this article, an expansive interpretation of "Tissue Engineering" is proposed which is in congruence with classical and recent published definitions. I further simplify the definition of tissue engineering as: "Exerting systematic control of the body's cells, matrices and fluids." As a consequence, many medical therapies not commonly considered tissue engineering are placed in this category because of their effect on the body's responses. While the progress of tissue engineering strategies is inexorable and generally positive, it has been subject to setbacks as have many important medical therapies. Medical practice is currently undergoing a transition on several fronts (academics, start-up companies, going concerns) from the era of "replacement medicine" where body parts and functions are replaced by mechanical, electrical or chemical therapies to the era of tissue engineering where health is restored by regeneration generation or limitation of the body's tissues and functions by exploiting our expanding knowledge of the body's biological processes to produce natural, healthy outcomes.

  11. Delirium After Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Giuseffi, Jennifer L; Borges, Nyal E; Boehm, Leanne M; Wang, Li; McPherson, John A; Fredi, Joseph L; Ahmad, Rashid M; Ely, E Wesley; Pandharipande, Pratik P

    2017-07-01

    Postoperative delirium is associated with increased mortality. Patients undergoing transcatheter aortic valve replacement are at risk for delirium because of comorbid conditions. To compare the incidence, odds, and mortality implications of delirium between patients undergoing transcatheter replacement and patients undergoing surgical replacement. The Richmond Agitation-Sedation Scale and the Confusion Assessment Method for the Intensive Care Unit were used to assess arousal level and delirium prospectively in all patients with severe aortic stenosis who had transcatheter or surgical aortic valve replacement at an academic medical center. Multivariable logistic regression was used to determine the relationship between procedure type and occurrence of delirium. Cox regression was used to assess the association between postoperative delirium and 6-month mortality. A total of 105 patients had transcatheter replacement and 121 had surgical replacement. Patients in the transcatheter group were older (median age, 81 vs 68 years; P replacement. Delirium is less likely to develop in the transcatheter group but is associated with higher mortality in both groups. ©2017 American Association of Critical-Care Nurses.

  12. Feeder replacement tooling and processes

    International Nuclear Information System (INIS)

    Mallozzi, R.; Goslin, R.; Pink, D.; Askari, A.

    2008-01-01

    Primary heat transport system feeder integrity has become a concern at some CANDU nuclear plants as a result of thinning caused by flow accelerated corrosion (FAC). Feeder inspections are indicating that life-limiting wall thinning can occur in the region between the Grayloc hub weld and second elbow of some outlet feeders. In some cases it has become necessary to replace thinned sections of affected feeders to restore feeder integrity to planned end of life. Atomic Energy of Canada Limited (AECL) and Babcock and Wilcox Canada Ltd. (B and W) have developed a new capability for replacement of single feeders at any location on the reactor face without impacting or interrupting operation of neighbouring feeders. This new capability consists of deploying trained crews with specialized tools and procedures for feeder replacements during planned outages. As may be expected, performing single feeder replacement in the congested working environment of an operational CANDU reactor face involves overcoming many challenges with respect to access to feeders, available clearances for tooling, and tooling operation and performance. This paper describes some of the challenges encountered during single feeder replacements and actions being taken by AECL and B and W to promote continuous improvement of feeder replacement tooling and processes and ensure well-executed outages. (author)

  13. The welfare implications of using exotic tortoises as ecological replacements.

    Science.gov (United States)

    Griffiths, Christine J; Zuël, Nicolas; Tatayah, Vikash; Jones, Carl G; Griffiths, Owen; Harris, Stephen

    2012-01-01

    Ecological replacement involves the introduction of non-native species to habitats beyond their historical range, a factor identified as increasing the risk of failure for translocations. Yet the effectiveness and success of ecological replacement rely in part on the ability of translocatees to adapt, survive and potentially reproduce in a novel environment. We discuss the welfare aspects of translocating captive-reared non-native tortoises, Aldabrachelys gigantea and Astrochelys radiata, to two offshore Mauritian islands, and the costs and success of the projects to date. Because tortoises are long-lived, late-maturing reptiles, we assessed the progress of the translocation by monitoring the survival, health, growth, and breeding by the founders. Between 2000 and 2011, a total of 26 A. gigantea were introduced to Ile aux Aigrettes, and in 2007 twelve sexually immature A. gigantea and twelve male A. radiata were introduced to Round Island, Mauritius. Annual mortality rates were low, with most animals either maintaining or gaining weight. A minimum of 529 hatchlings were produced on Ile aux Aigrettes in 11 years; there was no potential for breeding on Round Island. Project costs were low. We attribute the success of these introductions to the tortoises' generalist diet, habitat requirements, and innate behaviour. Feasibility analyses for ecological replacement and assisted colonisation projects should consider the candidate species' welfare during translocation and in its recipient environment. Our study provides a useful model for how this should be done. In addition to serving as ecological replacements for extinct Mauritian tortoises, we found that releasing small numbers of captive-reared A. gigantea and A. radiata is cost-effective and successful in the short term. The ability to release small numbers of animals is a particularly important attribute for ecological replacement projects since it reduces the potential risk and controversy associated with

  14. The welfare implications of using exotic tortoises as ecological replacements.

    Directory of Open Access Journals (Sweden)

    Christine J Griffiths

    Full Text Available Ecological replacement involves the introduction of non-native species to habitats beyond their historical range, a factor identified as increasing the risk of failure for translocations. Yet the effectiveness and success of ecological replacement rely in part on the ability of translocatees to adapt, survive and potentially reproduce in a novel environment. We discuss the welfare aspects of translocating captive-reared non-native tortoises, Aldabrachelys gigantea and Astrochelys radiata, to two offshore Mauritian islands, and the costs and success of the projects to date.Because tortoises are long-lived, late-maturing reptiles, we assessed the progress of the translocation by monitoring the survival, health, growth, and breeding by the founders. Between 2000 and 2011, a total of 26 A. gigantea were introduced to Ile aux Aigrettes, and in 2007 twelve sexually immature A. gigantea and twelve male A. radiata were introduced to Round Island, Mauritius. Annual mortality rates were low, with most animals either maintaining or gaining weight. A minimum of 529 hatchlings were produced on Ile aux Aigrettes in 11 years; there was no potential for breeding on Round Island. Project costs were low. We attribute the success of these introductions to the tortoises' generalist diet, habitat requirements, and innate behaviour.Feasibility analyses for ecological replacement and assisted colonisation projects should consider the candidate species' welfare during translocation and in its recipient environment. Our study provides a useful model for how this should be done. In addition to serving as ecological replacements for extinct Mauritian tortoises, we found that releasing small numbers of captive-reared A. gigantea and A. radiata is cost-effective and successful in the short term. The ability to release small numbers of animals is a particularly important attribute for ecological replacement projects since it reduces the potential risk and controversy

  15. Physical health problems experienced in the early postoperative recovery period following total knee replacement

    DEFF Research Database (Denmark)

    Szötz, Kirsten; Pedersen, Preben Ulrich; Hørdam, Britta

    2015-01-01

    of exercising in the early recovery period after discharge from hospital following total knee replacement. METHOD: A cross-sectional survey was conducted using a questionnaire. A total of 86 patients were included following first-time elective total knee replacement. Descriptive statistics were used. RESULTS......: The majority of the patients experienced leg oedema (90.7%). Secondary to this were pain (81.4%), sleeping disorders (47.7%) problems with appetite (38.4%) and bowel function (34.9%) were the most frequently identified physical health problems. In total, 69.8% of the patients indicated that they did...... not exercise or only partly exercise as recommended, but without associated experience of pain. CONCLUSION: Patients experienced a wide range of physical health problems following total knee replacement and deviation from recommended self-training was identified. These findings are valuable for health...

  16. Diagenetic replacement of Micas by Carbonates

    NARCIS (Netherlands)

    Oele, E.

    1961-01-01

    In the Ordovician sandstones of the Cantabrian Mountains a replacement of the micas by carbonate minerals could be observed. The absence of metamorphic minerals suggests a diagenetic replacement. This is supported by the finding of the same type of replacement in some undisturbed Pliocene sediments

  17. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  18. 24 CFR 891.605 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.605... 8 Assistance § 891.605 Replacement reserve. (a) Establishment of reserve. The Borrower shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance, and repair and...

  19. Point Lepreau Refurbishment Project. Programmable digital comparator (PDC) replacement for SDS1 and SDS2 - update 1

    International Nuclear Information System (INIS)

    Fraser, K.G.; Ichiyen, N.M.; Condor, A.E.; Thompson, P.D.

    2005-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station starting in April 2008. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the Programmable Digital Comparators for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the progress of the Phase 2 ESA program as well as the planned future (Phase 2) work for the PDC replacement for both shutdown systems. (author)

  20. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  1. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Wiechmann, K.

    1993-01-01

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.) [de

  2. Integrable RCS as a Proposed Replacement for Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Eldred, Jeffrey [Fermilab; Valishev, Alexander [Fermilab

    2017-03-07

    Integrable optics is an innovation in particle accelerator design that potentially enables a greater betatron tune spread and damps collective instabilities. An integrable rapid-cycling synchrotron (RCS) would be an effective replacement for the Fermilab Booster, as part of a plan to reach multi-MW beam power at 120 GeV for the Fermilab high-energy neutrino program. We provide an example integrable lattice with features of a modern RCS - dispersion-free drifts, low momentum compaction factor, superperiodicity, chromaticity correction, bounded beta functions, and separate-function magnets.

  3. Regulatory requirements for replacement of analog systems with digital upgrades

    International Nuclear Information System (INIS)

    Loeser, P.J.

    1993-01-01

    This paper reviews briefly the regulatory guidelines which must be met in order to replace analog systems in nuclear power plants with digital systems. There is a move to do such replacements for a number of reasons: analog systems are aging, and showing considerable drift; few vendors manufacture analog systems today; support and parts are hard to get; digital systems provide flexibility. There is a safety concern however about undesirable and unpredictable effects to digital safety equipment due to plant transients, accidents, post-accident condition, and EMI/RF environmental interferences. License holders must comply with the requirements of 10 C.F.R. 50.59, which deals with safety concerns with respect to any changes to operating plants which may have an impact on the safety of the plant. NRC staff is taking the position that all digital upgrades will require an evaluation under this regulation

  4. 30 CFR 800.30 - Replacement of bonds.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Replacement of bonds. 800.30 Section 800.30... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.30 Replacement... replacement performance bonds. Replacement of a performance bond pursuant to this section shall not constitute...

  5. 24 CFR 572.125 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ...) Homeownership Program Requirements-Implementation Grants § 572.125 Replacement reserves. (a) Purpose. A single replacement reserve may be established for the homeownership program only if HUD determines it is necessary to... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Replacement reserves. 572.125...

  6. Long-life slab replacement concrete.

    Science.gov (United States)

    2015-03-01

    This research was initiated following reports of high incidence of cracking on FDOT concrete pavement replacement : slab projects. Field slabs were instrumented for data acquisition from high-early-strength concrete pavement : replacement slabs place...

  7. Nuclear reactor fuel replacement system

    International Nuclear Information System (INIS)

    Kayano, Hiroyuki; Joge, Toshio.

    1976-01-01

    Object: To permit the direction in which a fuel replacement unit is moving to be monitored by the operator. Structure: When a fuel replacement unit approaches an intermediate goal position preset in the path of movement, renewal of data display on a goal position indicator is made every time the goal position is changed. With this renewal, the prevailing direction of movement of the fuel replacement unit can be monitored by the operator. When the control of movement is initiated, the co-ordinates of the intermediate goal point A are displayed on a goal position indicator. When the replacement unit reaches point A, the co-ordinates of the next intermediate point B are displayed, and upon reaching point B the co-ordinates of the (last) goal point C are displayed. (Nakamura, S.)

  8. 24 CFR 970.31 - Replacement units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement units. 970.31 Section... PUBLIC HOUSING PROGRAM-DEMOLITION OR DISPOSITION OF PUBLIC HOUSING PROJECTS § 970.31 Replacement units. Notwithstanding any other provision of law, replacement public housing units may be built on the original public...

  9. Revisiting the Cutaneous Impact of Oral Hormone Replacement Therapy

    Directory of Open Access Journals (Sweden)

    Gérald E. Piérard

    2013-01-01

    Full Text Available Menopause is a key point moment in the specific aging process of women. It represents a universal evolution in life. Its initiation is defined by a 12-month amenorrhea following the ultimate menstrual period. It encompasses a series of different biologic and physiologic characteristics. This period of life appears to spot a decline in a series of skin functional performances initiating tissue atrophy, withering, and slackness. Any part of the skin is possibly altered, including the epidermis, dermis, hypodermis, and hair follicles. Hormone replacement therapy (oral and nonoral and transdermal estrogen therapy represent possible specific managements for women engaged in the climacteric phase. All the current reports indicate that chronologic aging, climacteric estrogen deficiency, and adequate hormone therapy exert profound effects on various parts of the skin.

  10. GE Hitachi's parts asset management solutions (PAMS)

    International Nuclear Information System (INIS)

    Varno, M.; Lancaster, K.; Detamore, B.; Dinh, H.; Danielsson, J.; Vitaback, F.

    2014-01-01

    To ensure operational excellence and improve plant reliability, GE Hitachi Nuclear Energy (GEH) has partnered with its customers to develop PARTS Asset Management Solutions (PAMS). PAMS is a comprehensive set of services that enable plants to proactively manage inventory, obtain after-market replacement parts quickly, and resolve obsolescence issues, ensuring operation of equipment is maintained. PAMS includes: - Electronics Exchange Service Program (EESP) - On-demand exchange service program for GE electronics parts that guarantees rapid shipment of parts, results in cost savings and eliminates all obsolescence risk. - Engineering Services (ES) - Service that finds replacement electronics parts for customers encountering obsolescence. - System Assessment Report (SAR) - Comprehensive, customised report for customer systems that provides all information needed to minimise part availability risk. - Inventory Management (IM) - Visual application based on OEM drawings and decades of industry operational experience that enables customers to proactively identify obsolescence and inventory management issues. - Material Solutions (MS) - Fixed price and lead time model that allows the customer to set-up blanket contracts or purchase orders for obtaining needed parts with a focus on reduced overall cycle time. This paper will provide an overview of PAMS and showcase a case study of the PAMS Digitized deployment for an existing GEH customer. (authors)

  11. 31 CFR 361.8 - Claim for replacement.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Claim for replacement. 361.8 Section... § 361.8 Claim for replacement. Claim for replacement shall be made in writing to the Secretary, to the..., Parkersburg, WV 26106-1328. The claim, accompanied by a recommendation regarding the manner of replacement...

  12. Effect of growth hormone replacement therapy on pituitary hormone secretion and hormone replacement therapies in GHD adults

    DEFF Research Database (Denmark)

    Hubina, Erika; Mersebach, Henriette; Rasmussen, Ase Krogh

    2004-01-01

    We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes.......We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes....

  13. 24 CFR 891.745 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.745... and Individuals-Section 162 Assistance § 891.745 Replacement reserve. The general requirements for the replacement reserve are provided in § 891.605. For projects funded under §§ 891.655 through 891.790, the...

  14. Replacing Fish Oil with Vegetable Oils in Salmon Feed Increases Hepatic Lipid Accumulation and Reduces Insulin Sensitivity in Mice

    DEFF Research Database (Denmark)

    Midtbø, Lisa Kolden

    Background: Due to a growing global aquaculture production, fish oil (FO) and fish meal (FM) are partly replaced with vegetable ingredients in aqua feed for Atlantic salmon. These replacements in the feed lead to an altered fatty acid composition in the salmon fillet. We aimed to investigate how...... these changes affects obesity development and insulin sensitivity in mice eating the salmon. In addition, we wanted to investigate how the background diet affects the antiobesity effect of FO. Results: Western diets (WDs) were produced containing salmon fed either FO (WD-FO), or with partly replacement (80......%) of FO with different vegetable oils (VOs); rape seed oil (WDRO), olive oil (WD-OO) or soybean oil (WD-SO). These diets were given to C57BL/6J mice, and mice had higher hepatic lipid accumulation and lower insulin sensitivity when given WD-SO compared with WD-FO. Mice given WD-SO had higher hepatic...

  15. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  16. Ethics of Mitochondrial Replacement Techniques: A Habermasian Perspective.

    Science.gov (United States)

    Palacios-González, César

    2017-01-01

    Jürgen Habermas is regarded as a central bioconservative commentator in the debate on the ethics of human prenatal genetic manipulations. While his main work on this topic, The Future of Human Nature, has been widely examined in regard to his position on prenatal genetic enhancement, his arguments regarding prenatal genetic therapeutic interventions have for the most part been overlooked. In this work I do two things. First, I present the three necessary conditions that Habermas establishes for a prenatal genetic manipulation to be regarded as morally permissible. Second, I examine if mitochondrial replacement techniques meet these necessary conditions. I investigate, specifically, the moral permissibility of employing pronuclear transfer and maternal spindle transfer. I conclude that, according to a Habermasian perspective on prenatal genetic manipulation, maternal spindle transfer (without using a preselected sperm and egg) and pronuclear transfer are morally impermissible. Maternal spindle transfer is, in principle, morally permissible, but only when we have beforehand preselected a sperm and an egg for our reproductive purpose. These findings are relevant for bioconservatives, both for those who hold a Habermasian stance and for those who hold something akin to a Habermasian stance, because they answer the question: what should bioconservatives do regarding mitochondrial replacement techniques? In fact, the answer to this question does not only normatively prescribe what bioconservatives should do in terms of their personal morality, but it also points towards what kind of legislation regulating mitochondrial replacement techniques they should aim at. © 2017 The Authors Bioethics Published by John Wiley & Sons Ltd.

  17. Prolonged Intermittent Renal Replacement Therapy.

    Science.gov (United States)

    Edrees, Fahad; Li, Tingting; Vijayan, Anitha

    2016-05-01

    Prolonged intermittent renal replacement therapy (PIRRT) is becoming an increasingly popular alternative to continuous renal replacement therapy in critically ill patients with acute kidney injury. There are significant practice variations in the provision of PIRRT across institutions, with respect to prescription, technology, and delivery of therapy. Clinical trials have generally demonstrated that PIRRT is non-inferior to continuous renal replacement therapy regarding patient outcomes. PIRRT offers cost-effective renal replacement therapy along with other advantages such as early patient mobilization and decreased nursing time. However, due to lack of standardization of the procedure, PIRRT still poses significant challenges, especially pertaining to appropriate drug dosing. Future guidelines and clinical trials should work toward developing consensus definitions for PIRRT and ensure optimal delivery of therapy. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  18. The influence of optimism on functionality after total hip replacement surgery.

    Science.gov (United States)

    Balck, Friedrich; Lippmann, Maike; Jeszenszky, Csilla; Günther, Klaus-Peter; Kirschner, Stephan

    2016-08-01

    Among other factors, optimism has been shown to significantly influence the course of some diseases (cancer, HIV, coronary heart disease). This study investigated whether optimism of a patient before a total hip replacement can predict the functionality of the lower limbs 3 and 6 months after surgery. A total of 325 patients took part in the study (age: 58.7 years; w: 55%). The functionality was measured with the Western Ontario and McMaster Universities arthrosis index, and optimism with the Life Orientation Test. To analyse the influences of age, gender and optimism, general linear models were calculated. In optimistic patients, functionality improved significantly over time. The study showed a clear influence of dispositional optimism on the recovery after total hip replacement in the first 3 months after surgery. © The Author(s) 2015.

  19. A Bayesian perspective on some replacement strategies

    International Nuclear Information System (INIS)

    Mazzuchi, Thomas A.; Soyer, Refik

    1996-01-01

    In this paper we present a Bayesian decision theoretic approach for determining optimal replacement strategies. This approach enables us to formally incorporate, express, and update our uncertainty when determining optimal replacement strategies. We develop relevant expressions for both the block replacement protocol with minimal repair and the age replacement protocol and illustrate the use of our approach with real data

  20. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel's capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007. Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE's long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the

  1. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 1. Main report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Draft Environmental Impact Statement (EIS) for the replacement of the Australian Research reactor has been released. An important objective of the EIS process is to ensure that all relevant information has been collected and assessed so that the Commonwealth Government can make an informed decision on the proposal. The environmental assessment of the proposal to construct and operate a replacement reactor described in the Draft EIS has shown that the scale of environmental impacts that would occur would be acceptable, provided that the management measures and commitments made by ANSTO are adopted. Furthermore, construction and operation of the proposed replacement reactor would result in a range of benefits in health care, the national interest, scientific achievement and industrial capability. It would also result in a range of benefits derived from increased employment and economic activity. None of the alternatives to the replacement research reactor considered in the Draft EIS can meet all of the objectives of the proposal. The risk from normal operations or accidents has been shown to be well within national and internationally accepted risk parameters. The dose due to reactor operations would continue to be small and within regulatory limits. For the replacement reactor, the principle of `As Low As Reasonably Achievable` would form an integral part of the design and licensing process to ensure that doses to operators are minimized. Costs associated with the proposal are $286 million (in 1997 dollars) for design and construction. The annual operating and maintenance costs are estimated to be $12 million per year, of which a significant proportion will be covered by commercial activities. The costs include management of the spent fuel from the replacement reactor as well as the environmental management costs of waste management, safety and environmental monitoring. Decommissioning costs for the replacement reactor would arise at the end of its lifetime

  2. Transforming Normal Programs by Replacement

    NARCIS (Netherlands)

    Bossi, Annalisa; Pettorossi, A.; Cocco, Nicoletta; Etalle, Sandro

    1992-01-01

    The replacement transformation operation, already defined in [28], is studied wrt normal programs. We give applicability conditions able to ensure the correctness of the operation wrt Fitting's and Kunen's semantics. We show how replacement can mimic other transformation operations such as thinning,

  3. Replacement of sub-systems

    International Nuclear Information System (INIS)

    Rosen, S.E.

    1992-01-01

    This paper describes a number of quality aspects related to replacement of important systems or components in a nuclear power station. Reference is given to the steam generator replacement and power uprating performed at Ringhals 2 in Sweden in 1989. Since quality is a wide concept there has been put special emphasis in this paper to the important aspects that traditionally are not connected to quality. (author) 1 fig

  4. Spare parts sharing with joint optimization of maintenance and inventory policies

    DEFF Research Database (Denmark)

    Larsen, Christian; Wong, Hartanto Wijaya; Nielsen, Lars Relund

    We consider a collaborative arrangement where a number of companies are willing to share expensive spare parts, required for both failure replacement and preventive maintenance purposes. We develop a discrete-time Markov decision model for the joint optimization of maintenance and spare parts...

  5. Intrahippocampal administration of an androgen receptor antagonist, flutamide, can increase anxiety-like behavior in intact and DHT-replaced male rats.

    Science.gov (United States)

    Edinger, Kassandra L; Frye, Cheryl A

    2006-08-01

    Testosterone (T) and its 5alpha-reduced metabolite, dihydrotestosterone (DHT), can decrease anxiety-like behavior; however, the mechanisms underlying these effects have not been established. First, we hypothesized that if T reduces anxiety-like behavior through actions of its 5alpha-reduced metabolite, DHT, then gonadectomy (GDX) would increase anxiety-like behavior, an effect which would be reversed by systemic administration of DHT. Second, we hypothesized that if T and DHT reduce anxiety-like behavior in part through actions at intracellular androgen receptors in the hippocampus, then administration of an androgen receptor antagonist, flutamide, directly to the hippocampus should increase anxiety-like behavior of intact and DHT-replaced, but not GDX, male rats. Inserts that were empty or contained flutamide were applied directly to the dorsal hippocampus of intact, GDX, or GDX and DHT-replaced rats 2 h prior to testing in the open field, elevated plus maze, or defensive freezing tasks. GDX rats exhibited significantly more anxiety-like behaviors than intact or DHT-replaced rats. Intact and DHT-replaced rats administered flutamide to the hippocampus showed significantly more anxiety-like behavior than did intact and DHT-replaced controls. However, flutamide alone did not increase anxiety-like behavior of GDX rats. Together, these findings suggest that androgens can decrease anxiety-like behavior of male rats in part through DHT's actions at androgen receptors in the hippocampus.

  6. The modular endoprosthesis for mandibular body replacement. Part 1: Mechanical testing of the reconstruction

    NARCIS (Netherlands)

    Wong, R.C.; Tideman, H.; Merkx, M.A.W.; Jansen, J.A.; Goh, S.M.

    2012-01-01

    INTRODUCTION: In this paper we present the results of the mechanical testing of a new generation modular endoprosthesis, which has been designed to improve the results of mandibular reconstruction. MATERIALS AND METHODS: The new cementless endoprosthesis consists of a male part, a female part (both

  7. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  8. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Howden, G.F.

    1996-01-01

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  9. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  10. Virtual Parts Engineering Research Center

    Science.gov (United States)

    2010-05-20

    engineering 10 materials. High strength alloys , composites (polymer composites and metallic composites), and the like cannot merely be replaced by...ceramics, smart materials, shape memory alloys , super plastic materials and nano- structured materials may be more appropriate substitutes in a reverse...molding process using thermosetting Bakelite. For remanufacturing the part in small quantities, machining has been identified as the most economical

  11. Optimal composition of fluid-replacement beverages.

    Science.gov (United States)

    Baker, Lindsay B; Jeukendrup, Asker E

    2014-04-01

    The objective of this article is to provide a review of the fundamental aspects of body fluid balance and the physiological consequences of water imbalances, as well as discuss considerations for the optimal composition of a fluid replacement beverage across a broad range of applications. Early pioneering research involving fluid replacement in persons suffering from diarrheal disease and in military, occupational, and athlete populations incurring exercise- and/or heat-induced sweat losses has provided much of the insight regarding basic principles on beverage palatability, voluntary fluid intake, fluid absorption, and fluid retention. We review this work and also discuss more recent advances in the understanding of fluid replacement as it applies to various populations (military, athletes, occupational, men, women, children, and older adults) and situations (pathophysiological factors, spaceflight, bed rest, long plane flights, heat stress, altitude/cold exposure, and recreational exercise). We discuss how beverage carbohydrate and electrolytes impact fluid replacement. We also discuss nutrients and compounds that are often included in fluid-replacement beverages to augment physiological functions unrelated to hydration, such as the provision of energy. The optimal composition of a fluid-replacement beverage depends upon the source of the fluid loss, whether from sweat, urine, respiration, or diarrhea/vomiting. It is also apparent that the optimal fluid-replacement beverage is one that is customized according to specific physiological needs, environmental conditions, desired benefits, and individual characteristics and taste preferences.

  12. Guidelines for the technical evaluation of replacement items in nuclear power plants (NCIG-11)

    International Nuclear Information System (INIS)

    Craig, W.E.; Fakhar, A.A.; Shulman, M.N.

    1989-12-01

    This document presents guidelines and supporting information for the technical evaluation of replacement items in nuclear power plants. These guidelines contain six major sections which provide the practical knowledge and a programmatic approach to determine the technical and quality requirements necessary to generate purchase documents to procure the proper replacement items. The technical evaluation methodology includes the following steps. (1) Identification of the need for a technical evaluation. (2) Component/part functional classification procedures. (3) Performance of a Failure Modes and Effects Analysis. (4) Selection of Critical Characteristics for Design Determination. (5) Performance of a ''Like-For-Like'' or ''Alternate'' item Evaluation. (6) Preparation of the Technical and Quality Requirements Specification. Work on this document was initiated in response to the increased emphasis by the utilities owning nuclear power plants and nuclear industry on procurement of replacement items for use in safety related applications at nuclear power plants. 20 refs., 9 figs., 14 tabs

  13. Computer simulation of replacement sequences in copper

    International Nuclear Information System (INIS)

    Schiffgens, J.O.; Schwartz, D.W.; Ariyasu, R.G.; Cascadden, S.E.

    1978-01-01

    Results of computer simulations of , , and replacement sequences in copper are presented, including displacement thresholds, focusing energies, energy losses per replacement, and replacement sequence lengths. These parameters are tabulated for six interatomic potentials and shown to vary in a systematic way with potential stiffness and range. Comparisons of results from calculations made with ADDES, a quasi-dynamical code, and COMENT, a dynamical code, show excellent agreement, demonstrating that the former can be calibrated and used satisfactorily in the analysis of low energy displacement cascades. Upper limits on , , and replacement sequences were found to be approximately 10, approximately 30, and approximately 14 replacements, respectively. (author)

  14. Permanent Quadriplegia Following Replacement of Voice Prosthesis.

    Science.gov (United States)

    Ozturk, Kayhan; Erdur, Omer; Kibar, Ertugrul

    2016-11-01

    The authors presented a patient with quadriplegia caused by cervical spine abscess following voice prosthesis replacement. The authors present the first reported permanent quadriplegia patient caused by voice prosthesis replacement. The authors wanted to emphasize that life-threatening complications may be faced during the replacement of voice prosthesis. Care should be taken during the replacement of voice prosthesis and if some problems have been faced during the procedure patients must be followed closely.

  15. Structural considerations in steam generator replacement

    International Nuclear Information System (INIS)

    Bertheau, S.R.; Gazda, P.A.

    1991-01-01

    Corrosion of the tubes and tube-support structures inside pressurized water reactor (PWR) steam generators has led many utilities to consider a replacement of the generators. Such a project is a major undertaking for a utility and must be well planned to ensure an efficient and cost-effective effort. This paper discusses various structural aspects of replacement options, such as total or partial generator replacement, along with their associated pipe cuts; major structural aspects associated with removal paths through the equipment hatch or through an opening in the containment wall, along with the related removal processes; onsite movement and storage of the generators; and the advantages and disadvantages of the removal alternatives. This paper addresses the major structural considerations associated with a steam generator replacement project. Other important considerations (e.g., licensing, radiological concerns, electrical requirements, facilities for management and onsite administrative activities, storage and fabrication activities, and offsite transportation) are not discussed in this paper, but should be carefully considered when undertaking a replacement project

  16. Contradictions of Control, Part 2: Teachers, Students, and Curriculum.

    Science.gov (United States)

    McNeil, Linda M.

    1988-01-01

    Instead of freeing teachers to teach, schools' bureaucratic organization may have inadvertently produced ritualized, mechanistic teaching that elicits only minimal compliance from students. Defensive teaching strategies, including fragmentation (teaching by lists), mystifying information, omitting controversial topics, and simplifying material,…

  17. Application technique affects the potential of mineral concentrates from livestock manure to replace inorganic nitrogen fertilizer

    NARCIS (Netherlands)

    Klop, G.; Velthof, G.L.; Groenigen, van J.W.

    2012-01-01

    It has been suggested that mineral concentrates (MCs) produced from livestock manure might partly replace inorganic N fertilizers, thereby further closing the nitrogen (N) cycle. Here, we quantified nitrogen use efficiency (NUE) and N loss pathways associated with MCs, compared with inorganic

  18. Deleterious effects of omitting breakfast on insulin sensitivity and fasting lipid profiles in healthy lean women.

    Science.gov (United States)

    Farshchi, Hamid R; Taylor, Moira A; Macdonald, Ian A

    2005-02-01

    Breakfast consumption is recommended, despite inconclusive evidence of health benefits. The study's aim was to ascertain whether eating breakfast (EB) or omitting breakfast (OB) affects energy intake, energy expenditure, and circulating insulin, glucose, and lipid concentrations in healthy women. In a randomized crossover trial, 10 women [x+/-SD body mass index (BMI; in kg/m2): 23.2+/-1.4] underwent two 14-d EB or OB interventions separated by a 2-wk interval. In the EB period, subjects consumed breakfast cereal with 2%-fat milk before 0800 and a chocolate-covered cookie between 1030 and 1100. In the OB period, subjects consumed the cookie between 1030 and 1100 and the cereal and milk between 1200 and 1330. Subjects then consumed 4 additional meals with content similar to usual at predetermined times later in the day and recorded food intake on 3 d during each period. Fasting and posttest meal glucose, lipid, and insulin concentrations and resting energy expenditure were measured before and after each period. Reported energy intake was significantly lower in the EB period (P=0.001), and resting energy expenditure did not differ significantly between the 2 periods. OB was associated with significantly higher fasting total and LDL cholesterol than was EB (3.14 and 3.43 mmol/L and 1.55 and 1.82 mmol/L, respectively; P=0.001). The area under the curve of insulin response to the test meal was significantly lower after EB than after OB (P<0.01). OB impairs fasting lipids and postprandial insulin sensitivity and could lead to weight gain if the observed higher energy intake was sustained.

  19. An oral multiparticulate, modified-release, hydrocortisone replacement therapy that provides physiological cortisol exposure.

    Science.gov (United States)

    Whitaker, Martin; Debono, Miguel; Huatan, Hiep; Merke, Deborah; Arlt, Wiebke; Ross, Richard J

    2014-04-01

    It is not possible with current hydrocortisone replacement to mimic the diurnal cortisol profile in patients with adrenal insufficiency. Previous attempts with modified-release technology were unsuccessful. Our objective was to develop hydrocortisone formulations that recreate the diurnal cortisol profile using multiparticulate technology. Screening by in vitro dissolution profiles, pharmacokinetic (PK) testing in dexamethasone-suppressed dogs and humans, and comparison with a reference population. Field laboratories and clinical research facility. Formulations were generated using an enteric (delayed release) design configuration with an extended (sustained release) dissolution profile. In vitro dissolution confirmed delayed and sustained hydrocortisone release. However, in dogs and humans, sustained release resulted in reduced bioavailability. A formulation, DIURF-006, was developed that maintained delayed release but omitted the sustained-release functionality. PK characterization of DIURF-006 showed that, despite absence of a sustained-release component, absorption was sufficiently sustained to deliver extended hydrocortisone absorption. In dexamethasone-suppressed volunteers (n = 16) receiving a twice-daily 'toothbrush' regimen (20 mg at 23:00 h and 10 mg at 07:00 h), DIURF-006 gave a similar cortisol profile to physiological cortisol levels: DIURF-006 vs physiological, Geomean AUC 5610 vs 4706 h * nmol/l, Geomean Cmax 665 vs 594 nmol/l and Median Tmax 8·5 h vs clock time 08:12 h for peak cortisol. The relative bioavailability of DIURF-006 vs hydrocortisone was 89%, and cortisol levels increased linearly with doses between 5 and 30 mg. A multiparticulate oral hydrocortisone formulation with only an enteric coat provides delayed and sustained absorption and when given in a 'toothbrush' regimen provides physiological cortisol exposure. © 2013 John Wiley & Sons Ltd.

  20. Antifungal properties of fermentates and their potential to replace sorbate and propionate in pound cake.

    Science.gov (United States)

    Samapundo, S; Devlieghere, F; Vroman, A; Eeckhout, M

    2016-11-21

    The major objective of this study was to assess the antifungal activities of commercially available 'clean label' fermentates and their potential to replace the preservative function of sorbate and propionate in cake. This study was performed in two parts. In the first part of the study the inhibitory activities of selected fermentates - FA, FB, FC and FD - towards Aspergillus tritici and Aspergillus amstelodami were assessed as a function of pH (5.0-6.5) on malt extract agar (MEA). In the second part of the study, challenge, shelf-life and sensorial tests were used to determine the suitability of these fermentates to replace potassium sorbate and calcium propionate in quarter pound cake. All the fermentates evaluated in this study all had significant (prange for application in bakery products. In all cases, the inhibitory activity of the fermentates increased with a decrease in the pH and an increase in concentration. FC was generally the most inhibitory whilst FD was the least inhibitory. Significant (p0.05) in flavour from the reference cake (0.5% calcium propionate and 0.54% potassium sorbate). However, the challenge and shelf-life tests showed that cakes produced with ≤1% FC were not as microbiologically shelf-stable as the reference cake, especially when sliced. Therefore, it can be concluded that whilst fermentates have appreciable antifungal effects, their use could potentially result in reduced shelf-stabilities. Robust challenge and shelf-life tests would be recommended before the marketing of cakes were propionate and/or sorbate has been replaced to ensure accurate shelf-lives are stated. Copyright © 2016 Elsevier B.V. All rights reserved.

  1. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  2. Knee Replacement

    Science.gov (United States)

    ... days. Medications prescribed by your doctor should help control pain. During the hospital stay, you'll be encouraged to move your ... exercise your new knee. After you leave the hospital, you'll continue physical ... mobility and a better quality of life. And most knee replacements can be ...

  3. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  4. 30 CFR 75.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 75.1438 Section 75.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... attachment replacement. Wire rope attachments shall be replaced when cracked, deformed, or excessively worn. ...

  5. 30 CFR 57.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 57.19028 Section 57.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Hoisting Wire Ropes § 57.19028 End attachment replacement. Wire rope attachments shall be replaced when...

  6. 30 CFR 56.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 56.19028 Section 56.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Wire Ropes § 56.19028 End attachment replacement. Wire rope attachments shall be replaced when cracked...

  7. 30 CFR 77.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 77.1438 Section 77.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... Personnel Hoisting Wire Ropes § 77.1438 End attachment replacement. Wire rope attachments shall be replaced...

  8. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR THE SAVANNAH RIVER SITE'S DEFENSE WASTE PROCESSING FACILITY

    International Nuclear Information System (INIS)

    Krementz, D

    2007-01-01

    The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) requested development of tooling for remote replacement of gaskets in mechanical Hanford connectors. The facility has compressed air supply, two master-slave manipulators (MSM's) and a lightweight robotic arm for operation of the remote tools. The Savannah River National Laboratory (SRNL) developed and tested multiple tools to perform the gasket replacement tasks. Separate pneumatic snap-ring removal tools that use the connector skirt as a reaction surface were developed for removal of the snap ring and spent gasket on both vertical and horizontal Hanford connectors. A pneumatic tool that clamps and centers on the jumper pipe ID was developed to simultaneously install the new gasket and snap ring. A pneumatic snap-ring-loading tool was developed that compresses the snap ring and places it in a groove in the installation tool. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. The entire system has been successfully tested using MSM's to manipulate the various tools. Deployment of the entire system is expected during FY08. The Hanford connector gasket replacement tooling has been successfully tested using MSM's to manipulate the various tools. Nitric acid is used in many of the decontamination processes performed in the REDC, where the tooling will be deployed. Although most of the tool components were fabricated/purchased with nitric acid and radioactive service in mind, some of the prototype parts must be replaced with parts that are more compatible with nitric acid/radioactive service. Several modifications to the various tools are needed to facilitate maintenance and replacement of failed components. Development of installation tools for replacement of 1-inch, 2-inch and multi-hole gaskets is being considered. Deployment of the existing system in the DWPF REDC is expected during FY

  9. Replacement of the moderator cell unit of JRR-3's cold neutron source facility

    International Nuclear Information System (INIS)

    Hazawa, Tomoya; Nagahori, Kazuhisa; Kusunoki, Tsuyoshi

    2006-10-01

    The moderator cell of the JRR-3's cold neutron source (CNS) facility, converts thermal neutrons into cold neutrons by passing through liquid cold hydrogen. The cold neutrons are used for material and life science research such as the neutron scattering. The CNS has been operated since the start of JRR-3's in 1990. The moderator cell containing liquid hydrogen is made of stainless steel. The material irradiation lifetime is limited to 7 years due to irradiation brittleness. The first replacement was done by using a spare part made in France. This replacement work of 2006 was carried out by using the domestic moderator cell unit. The following technologies were developed for the moderator cell unit production. 1) Technical development of black treatment on moderator cell surface to increase radiation heat. 2) Development of bending technology of concentric triple tubes consisting from inside tube, Outside tube and Vacuum insulation tube. 3) Development of manufacturing technique of the moderator cell with complicated shapes. According to detail planed work procedures, replacement work was carried out. As results, the working days were reduced to 80% of old ones. The radiation dose was also reduced due to reduction of working days. It was verified by measurement of neutrons characteristics that the replaced moderator cell has the same performance as that of the old moderator cell. The domestic manufacturing of the moderator cell was succeeded. As results, the replacement cost was reduced by development of domestic production technology. (author)

  10. Alternate-Fueled Combustor-Sector Performance: Part A: Combustor Performance Part B: Combustor Emissions

    Science.gov (United States)

    Shouse, D. T.; Neuroth, C.; Henricks, R. C.; Lynch, A.; Frayne, C.; Stutrud, J. S.; Corporan, E.; Hankins, T.

    2010-01-01

    Alternate aviation fuels for military or commercial use are required to satisfy MIL-DTL-83133F(2008) or ASTM D 7566 (2010) standards, respectively, and are classified as drop-in fuel replacements. To satisfy legacy issues, blends to 50% alternate fuel with petroleum fuels are certified individually on the basis of feedstock. Adherence to alternate fuels and fuel blends requires smart fueling systems or advanced fuel-flexible systems, including combustors and engines without significant sacrifice in performance or emissions requirements. This paper provides preliminary performance (Part A) and emissions and particulates (Part B) combustor sector data for synthetic-parafinic-kerosene- (SPK-) type fuel and blends with JP-8+100 relative to JP-8+100 as baseline fueling.

  11. Risks of hip and knee replacement

    Science.gov (United States)

    ... is normal to lose blood during and after hip or knee replacement surgery. Some people need a ... clot form are higher during and soon after hip or knee replacement surgery. Sitting or lying down ...

  12. Skilled nursing facilities after joint replacement

    Science.gov (United States)

    ... care providers in the weeks before your joint replacement. They can advise you about whether going directly ... of many people who have had a joint replacement? Can they tell you how many? A good ...

  13. The use of transcatheter aortic valve replacement vs surgical aortic valve replacement for the treatment of aortic stenosis

    Directory of Open Access Journals (Sweden)

    Jensen HA

    2015-08-01

    Full Text Available Hanna A Jensen, Lillian L Tsai, Vinod H Thourani Division of Cardiothoracic Surgery, Joseph B Whitehead Department of Surgery, Structural Heart and Valve Center, Emory University School of Medicine, Atlanta, GA, USA Abstract: Severe aortic stenosis (AS is associated with considerable morbidity and mortality and is increasing in prevalence as the global population increases. Since AS primarily affects the elderly, many of these patients have comorbidities that make them poor candidates for the gold standard treatment for AS, surgical aortic valve replacement. Transcatheter aortic valve replacement has emerged as a novel technology for the management of AS in higher risk patients over the past decade. Randomized trials have established the safety and efficacy of transcatheter aortic valve replacement, and the medical community has rallied to identify the patients who are most suitable for this transformative treatment. This review focuses on outlining the key procedural differences, describing the unique challenges of both operations, and finally assessing and comparing outcomes both on a general level and in challenging patient subgroups. Keywords: aortic valve replacement, transcatheter aortic valve replacement, surgical aortic valve replacement 

  14. Long-life slab replacement concrete : [summary].

    Science.gov (United States)

    2015-04-01

    Concrete slab replacement projects in Florida have demonstrated a high incidence of : replacement slab cracking. Causes of cracking have not been reliably determined. University of South Florida researchers : sought to identify the factors or : param...

  15. A spare-parts inventory program for TRIGA reactors

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, T V; Ringle, J C; Johnson, A G [Oregon State University (United States)

    1974-07-01

    As is fairly common with new reactor facilities, we had a few spare parts on hand as part of our original purchase when the OSU TRIGA first went critical in March of 1967. Within a year or so, however, it became apparent that we should critically examine our spare parts inventory in order to avoid unnecessary or prolonged outages due to lack of a crucial piece of equipment. Many critical components (those which must be present and operable according to our license or technical specifications) were considered, and a priority list of acquiring these was established. This first list was drawn up in March, 1969, two years after initial criticality, and some key components were ordered. The availability of funds was the overriding restriction then and now. This spare-parts list is reviewed and new components purchased annually; the average amount spent has been about $2,000 per year. This inventory has proved invaluable more than once; without it, we would have had lengthy shutdowns awaiting the arrival of the needed component. The sobering thought, however, is that our spare-parts inventory is still not complete-far from it, in fact, because this would be prohibitively expensive. It is very difficult to guess with 100% accuracy just which component might need replacing, and your $10,000 inventory of spare parts is useless in that instance if it doesn't include the needed part. An idea worth considering is to either (a) encourage General Atomic, through the collective voice of all TRIGA owners, to maintain a rather complete inventory of replacement parts, or (b) maintain an owner's spare-parts pool, financed by contributions from all the facilities. If either of these pools was established, the needed part could reach any facility within the U.S. within a few days, minimizing reactor outage time. (author)

  16. A spare-parts inventory program for TRIGA reactors

    International Nuclear Information System (INIS)

    Anderson, T.V.; Ringle, J.C.; Johnson, A.G.

    1974-01-01

    As is fairly common with new reactor facilities, we had a few spare parts on hand as part of our original purchase when the OSU TRIGA first went critical in March of 1967. Within a year or so, however, it became apparent that we should critically examine our spare parts inventory in order to avoid unnecessary or prolonged outages due to lack of a crucial piece of equipment. Many critical components (those which must be present and operable according to our license or technical specifications) were considered, and a priority list of acquiring these was established. This first list was drawn up in March, 1969, two years after initial criticality, and some key components were ordered. The availability of funds was the overriding restriction then and now. This spare-parts list is reviewed and new components purchased annually; the average amount spent has been about $2,000 per year. This inventory has proved invaluable more than once; without it, we would have had lengthy shutdowns awaiting the arrival of the needed component. The sobering thought, however, is that our spare-parts inventory is still not complete-far from it, in fact, because this would be prohibitively expensive. It is very difficult to guess with 100% accuracy just which component might need replacing, and your $10,000 inventory of spare parts is useless in that instance if it doesn't include the needed part. An idea worth considering is to either (a) encourage General Atomic, through the collective voice of all TRIGA owners, to maintain a rather complete inventory of replacement parts, or (b) maintain an owner's spare-parts pool, financed by contributions from all the facilities. If either of these pools was established, the needed part could reach any facility within the U.S. within a few days, minimizing reactor outage time. (author)

  17. Hip or knee replacement - in the hospital after

    Science.gov (United States)

    Hip replacement surgery - after - self-care; Knee replacement surgery - after - self-care ... taking walks in the hallways with help. After knee replacement, some surgeons recommend using a continuous passive ...

  18. Temelin NPP - IandC replacement

    International Nuclear Information System (INIS)

    Spalenka, I.

    1997-01-01

    The original instrumentation and control system of the Temelin nuclear power plant is being upgraded and replaced by a modern Westinghouse-supplied system which meets the requirements imposed on current nuclear power plant designs. The history and purpose of the IandC system replacement is given, and the design of the new system is described in some detail. (A.K.)

  19. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  20. Hormone Replacement Therapy and Your Heart

    Science.gov (United States)

    Hormone replacement therapy and your heart Are you taking — or considering — hormone therapy to treat bothersome menopausal symptoms? Understand ... you. By Mayo Clinic Staff Long-term hormone replacement therapy used to be routinely prescribed for postmenopausal ...

  1. Tree Regeneration Spatial Patterns in Ponderosa Pine Forests Following Stand-Replacing Fire: Influence of Topography and Neighbors

    Directory of Open Access Journals (Sweden)

    Justin P. Ziegler

    2017-10-01

    Full Text Available Shifting fire regimes alter forest structure assembly in ponderosa pine forests and may produce structural heterogeneity following stand-replacing fire due, in part, to fine-scale variability in growing environments. We mapped tree regeneration in eighteen plots 11 to 15 years after stand-replacing fire in Colorado and South Dakota, USA. We used point pattern analyses to examine the spatial pattern of tree locations and heights as well as the influence of tree interactions and topography on tree patterns. In these sparse, early-seral forests, we found that all species were spatially aggregated, partly attributable to the influence of (1 aspect and slope on conifers; (2 topographic position on quaking aspen; and (3 interspecific attraction between ponderosa pine and other species. Specifically, tree interactions were related to finer-scale patterns whereas topographic effects influenced coarse-scale patterns. Spatial structures of heights revealed conspecific size hierarchies with taller trees in denser neighborhoods. Topography and heterospecific tree interactions had nominal effect on tree height spatial structure. Our results demonstrate how stand-replacing fires create heterogeneous forest structures and suggest that scale-dependent, and often facilitatory, rather than competitive, processes act on regenerating trees. These early-seral processes will establish potential pathways of stand development, affecting future forest dynamics and management options.

  2. 77 FR 64755 - Medicare and Medicaid Programs; Electronic Health Record Incentive Program-Stage 2; Corrections

    Science.gov (United States)

    2012-10-23

    ... replace a placeholder ``ONC reference once available'' with the reference when it became available. On... omitted references to the applicable provider or supplier (that is, eligible professional (EP), eligible... Procedure Act (APA) (5 U.S.C. 553(b)). However, we can waive this notice and comment procedure if the...

  3. New one cycle criteria for optimizing preventive replacement policies

    International Nuclear Information System (INIS)

    Hamidi, Maryam; Szidarovszky, Ferenc; Szidarovszky, Miklos

    2016-01-01

    Models are introduced and examined for the optimum scheduling of preventive replacements. The “replace first” and “replace last” models are known from the literature if the long term expected cost per unit time is minimized. We will first introduce the one cycle counterparts of these models when the expected costs per unit time in a single cycle is minimized. If the unit performs identical projects sequentially then the “replace next” model assumes that the preventive replacement is postponed until the ongoing project is finished. The termination time of this project is random which also depends on the scheduled time of the preventive replacement in contrary to the “replace first” and “replace last” models. The mathematical models are formulated and conditions are given for the existence of finite optima. Numerical examples and a simulation study illustrate the methodology and the numerical results show interesting comparisons of the different models. - Highlights: • The Single cycle age replacement model is extended incorporating repairable failures. • In order to avoid project interruption costs, three model variants are discussed. • Model variants are replace first, replace last and replace next. • In many cases analytic solutions are derived and illustrated by numerical examples. • The different model variants and their results are compared based on simulation studies.

  4. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    2005-01-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  5. Replacement Saltwell Pumping System Document Bibliography

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document bibliography is prepared to identify engineering documentation developed during the design of the Replacement Saltwell Pumping System. The bibliography includes all engineering supporting documents and correspondence prepared prior to the deployment of the system in the field. All documents referenced are available electronically through the Records Management Information System (RMIS). Major components of the Replacement Saltwell Pumping System include the Sundyne Canned Motor Pump, the Water Filter Skid, the Injection Water Skid and the Backflow Preventer Assembly. Drawing H-14-104498 provides an index of drawings (fabrication details, PandIDs, etc.) prepared to support development of the Replacement Saltwell Pumping System. Specific information pertaining to new equipment can be found in Certified Vendor Information (CVI) File 50124. This CVI file has been established specifically for new equipment associated with the Replacement Saltwell Pumping System

  6. Design and manufacture of steam generators for replacement

    International Nuclear Information System (INIS)

    Hirano, Hiroshi; Kuri, Syuhei

    1995-01-01

    The basic specification of the steam generators for replacement as heat exchangers (the pressure, temperature, flow rate and thermal output on primary and secondary sides) is set same as that of steam generators before replacement, but the latest design reflecting the operation experience obtained so far and taking the countermeasures for preventing heating tube damage in it is adopted, such as the heating tubes made of TT 690 alloy, the tube support plates with four-lobe shape tube holes made of stainless steel, the stainless steel rest fittings of three in one set and so on. After the heating tube break accident in Mihama No. 2 plant, the quality control was further strengthened. The comparison of the specifications of the steam generators of respective plants before and after the replacement is shown. The main objective of improving steam generators is the heightening of the reliability of heating tubes against intergranular attack and primary water stress corrosion cracking. The improvements of heating tube material, tube support plate material, secondary side heat flow, the shape of tube holes of tube support plates, the method of expanding heating tubes, and vibration-controlling fittings are explained. As to the manufacturing procedure and quality control, the manufacture of raw materials, the build-up welding of tube plates, the manufacture of lower half shell plates, the tube hole making of support plates, the insection of outer cylinder, flow rate distribution plate. Support plates and heating tubes, the sealing welding and expanding of heating tubes, the fixing of rest fittings, the manufacture and fixing of water chamber cover, the manufacture of upper half shell, the fixing of parts inside it, the final joint and inspection are described. (K.I.)

  7. Optimum body size of Holstein replacement heifers.

    Science.gov (United States)

    Hoffman, P C

    1997-03-01

    Criteria that define optimum body size of replacement heifers are required by commercial dairy producers to evaluate replacement heifer management programs. Historically recommended body size criteria have been based on live BW measurements. Numerous research studies have observed a positive relationship between BW at first calving and first lactation milk yield, which has served as the impetus for using live BW to define body size of replacement heifers. Live BW is, however, not the only available measurement to define body size. Skeletal measurements such as wither height, length, and pelvic area have been demonstrated to be related to first lactation performance and (or) dystocia. Live BW measurements also do not define differences in body composition. Differences in body composition of replacement heifers at first calving are also related to key performance variables. An updated research data base is available for the modern Holstein genotype to incorporate measures of skeletal growth and body composition with BW when defining body size. These research projects also lend insight into the relative importance of measurements that define body size of replacement heifers. Incorporation of these measurements from current research into present BW recommendations should aid commercial dairy producers to better define replacement heifer growth and management practices. This article proposes enhancements in defining optimum body size and growth characteristics of Holstein replacement heifers.

  8. Knee joint replacement

    Science.gov (United States)

    ... to make everyday tasks easier. Practice using a cane, walker , crutches , or a wheelchair correctly. On the ... ask your doctor Knee joint replacement - discharge Preventing falls Preventing falls - what to ask your doctor Surgical ...

  9. An oral multi-particulate, modified release, hydrocortisone replacement therapy that provides physiological cortisol exposure

    Science.gov (United States)

    Huatan, Hiep; Merke, Deborah; Arlt, Wiebke; Ross, Richard J.

    2013-01-01

    Objective It is not possible with current hydrocortisone replacement to mimic the diurnal cortisol profile in patients with adrenal insufficiency. Previous attempts with modified release technology were unsuccessful. Our objective was to develop hydrocortisone formulations that recreate the diurnal cortisol profile using multi-particulate technology. Design and Measurements Screening by in-vitro dissolution profiles, pharmacokinetic testing in dexamethasone suppressed dogs and humans, and comparison to a reference population. Setting Field laboratories and clinical research facility. Results Formulations were generated using an enteric (delayed-release) design configuration with an extended (sustained-release) dissolution profile. In-vitro dissolution confirmed delayed and sustained hydrocortisone release. However, in dogs and humans, sustained release resulted in reduced bioavailability. A formulation, DIURF-006, was developed that maintained delayed release but omitted the sustained release functionality. Pharmacokinetic characterisation of DIURF-006 showed that, despite absence of a sustained release component, absorption was sufficiently sustained to deliver extended hydrocortisone absorption. In dexamethasone-suppressed volunteers (n=16) receiving a twice daily ‘toothbrush’ regimen (20mg at 23:00h and 10mg at 07:00h), DIURF-006 gave a similar cortisol profile to physiological cortisol levels: DIURF-006 vs physiological, Geomean AUC 5610 vs 4706 hr*nmol/l, Geomean Cmax 665 vs 594 nmol/l and Median Tmax 8.5h vs clock time 08:12 hours for peak cortisol. The relative bioavailability of DIURF-006 vs hydrocortisone was 89% and cortisol levels increased linearly with doses between 5 and 30mg. Conclusion A multi-particulate oral hydrocortisone formulation with only an enteric coat provides delayed and sustained absorption and when given in a ‘toothbrush’ regimen provides physiological cortisol exposure. PMID:23980724

  10. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Science.gov (United States)

    D'Emic, Michael D; Whitlock, John A; Smith, Kathlyn M; Fisher, Daniel C; Wilson, Jeffrey A

    2013-01-01

    Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs.

  11. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Directory of Open Access Journals (Sweden)

    Michael D D'Emic

    Full Text Available BACKGROUND: Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. METHODOLOGY/PRINCIPAL FINDINGS: We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days. Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. CONCLUSIONS/SIGNIFICANCE: Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size, and derived titanosaurs and

  12. 7 CFR 1944.659 - Replacement housing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Replacement housing. 1944.659 Section 1944.659 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) HOUSING Housing Preservation Grants § 1944.659 Replacement housing...

  13. Age replacement models: A summary with new perspectives and methods

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Al-Khalifa, Khalifa N.; Magid Hamouda, Abdel; Nakagawa, Toshio

    2017-01-01

    Age replacement models are fundamental to maintenance theory. This paper summarizes our new perspectives and hods in age replacement models: First, we optimize the expected cost rate for a required availability level and vice versa. Second, an asymptotic model with simple calculation is proposed by using the cumulative hazard function skillfully. Third, we challenge the established theory such that preventive replacement should be non-random and only corrective replacement should be made for the unit with exponential failure. Fourth, three replacement policies with random working cycles are discussed, which are called overtime replacement, replacement first, and replacement last, respectively. Fifth, the policies of replacement first and last are formulated with general models. Sixth, age replacement is modified for the situation when the economical life cycle of the unit is a random variable with probability distribution. Finally, models of a parallel system with constant and random number of units are taken into considerations. The models of expected cost rates are obtained and optimal replacement times to minimize them are discussed analytically and computed numerically. Further studies and potential applications are also indicated at the end of discussions of the above models. - Highlights: • Optimization of cost rate for availability level is discussed and vice versa. • Asymptotic and random replacement models are discussed. • Overtime replacement, replacement first and replacement last are surveyed. • Replacement policy with random life cycle is given. • A parallel system with random number of units is modeled.

  14. Implant Optimisation for Primary Hip Replacement in Patients over 60 Years with Osteoarthritis: A Cohort Study of Clinical Outcomes and Implant Costs Using Data from England and Wales.

    Directory of Open Access Journals (Sweden)

    Simon S Jameson

    Full Text Available Hip replacement is one of the most commonly performed surgical procedures worldwide; hundreds of implant configurations provide options for femoral head size, joint surface material and fixation method with dramatically varying costs. Robust comparative evidence to inform the choice of implant is needed. This retrospective cohort study uses linked national databases from England and Wales to determine the optimal type of replacement for patients over 60 years undergoing hip replacement for osteoarthritis.Implants included were the commonest brand from each of the four types of replacement (cemented, cementless, hybrid and resurfacing; the reference prosthesis was the cemented hip procedure. Patient reported outcome scores (PROMs, costs and risk of repeat (revision surgery were examined. Multivariable analyses included analysis of covariance to assess improvement in PROMs (Oxford hip score, OHS, and EQ5D index (9159 linked episodes and competing risks modelling of implant survival (79,775 procedures. Cost of implants and ancillary equipment were obtained from National Health Service procurement data.EQ5D score improvements (at 6 months were similar for all hip replacement types. In females, revision risk was significantly higher in cementless hip prostheses (hazard ratio, HR = 2.22, p<0.001, when compared to the reference hip. Although improvement in OHS was statistically higher (22.1 versus 20.5, p<0.001 for cementless implants, this small difference is unlikely to be clinically important. In males, revision risk was significantly higher in cementless (HR = 1.95, p = 0.003 and resurfacing implants, HR = 3.46, p<0.001, with no differences in OHS. Material costs were lowest with the reference implant (cemented, range £1103 to £1524 and highest with cementless implants (£1928 to £4285. Limitations include the design of the study, which is intrinsically vulnerable to omitted variables, a paucity of long-term implant survival data (reflecting the

  15. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  16. CT-based quantification of bone stock in large head metal-on-metal unilateral total hip replacements

    NARCIS (Netherlands)

    Boomsma, Martijn F.; Slouwerhof, Inge; van Lingen, Christiaan; Pakvis, Dean F. M.; van Dalen, Jorn A.; Edens, Mireille A.; Ettema, Harmen B.; Verheyen, Cees C. P. M.; Maas, Mario

    2016-01-01

    To explore ipsilateral and contralateral acetabular roof bone stock density in unilateral large head MoM THA whether there is a significant lower acetabular bone stock in the hip with a metal-on-metal (MoM) total hip replacement compared to the contralateral side. Second part of this study is to

  17. Hip Resurfacing: An Alternative to Conventional Hip Replacement?

    Science.gov (United States)

    ... Is hip resurfacing a good alternative to hip replacement? Answers from Mark Spangehl, M.D. Hip resurfacing has lost favor with many surgeons ... women with poor bone quality. Unlike traditional hip replacement, hip resurfacing doesn't completely replace the "ball" ...

  18. Rheological, fat bloom, and sensory acceptability effects of mango kernel fat and palm olein blends on chocolate-flavored coatings

    OpenAIRE

    Nieves María Flores March; Gabriela Cristina Chire Fajardo; Carlos Eduardo Lescano Anadón

    2017-01-01

    The effects of replacing cocoa butter with different percentages and proportions of a mango kernel fat/palm olein (MKF/POL) blend, are reported. Samples were prepared by melting together mango kernel fat, palm olein, cocoa butter and cocoa mass and powdered sugar combinated. The samples were milled, conched, tempered, and molded to obtain three sets of seven samples as follows: one control omitting mango kernel fat and palm olein, and six samples with cocoa butter replacement of 15 and 22.5% ...

  19. Replacement of Eocene white sandy limestone in historical buildings : over 100 years of practice in the Netherlands

    NARCIS (Netherlands)

    Quist, W.J.; Nijland, T.G.; Hees, R.P.J. van

    2013-01-01

    This paper discusses the replacement of white sandy limestone (Gobertange and Lede or Balegem) in the Netherlands in (successive) restorations from the mid-19th century onwards. White sandy limestone, transported from the southern part of the Low Countries (now Belgium), was extensively used in the

  20. 49 CFR Appendix B to Part 564 - Information To Be Submitted for Long Life Replaceable Light Sources of Limited Definition

    Science.gov (United States)

    2010-10-01

    ...—Information To Be Submitted for Long Life Replaceable Light Sources of Limited Definition I. Filament or... Source that Operates With a Ballast and Rated Life of the Light Source/Ballast Combination. A. Maximum power (in watts). B. Luminous Flux (in lumens). C. Rated laboratory life of the light source/ballast...

  1. Optimization of inspection and replacement period by using Bayesian statistics

    International Nuclear Information System (INIS)

    Kasai, Masao; Watanabe, Yasushi; Kusakari, Yoshiyuki; Notoya, Junichi

    2006-01-01

    This study describes the formulations to optimize the time interval of inspections and/or replacements of equipment/parts taking into account the probability density functions (PDF) for failure rates and parameters of failure distribution functions (FDF) and evaluates the optimized results of these time intervals using our formulations by comparing with those using only representative values of failure rates and the parameters of FDF instead of using these PDFs. The PDFs are obtained with Bayesian method and the representative values are obtained with likelihood estimation method. However, any significant difference is not observed between both optimized results within our preliminary calculations. (author)

  2. Electrocatalysts Prepared by Galvanic Replacement

    Directory of Open Access Journals (Sweden)

    Athanasios Papaderakis

    2017-03-01

    Full Text Available Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases hydrogen evolution too, both oxygen levels and the pH must be optimized. The resulting bimetallic material can in principle have a Mnoble-rich shell and M-rich core (denoted as Mnoble(M leading to a possible decrease in noble metal loading and the modification of its properties by the underlying metal M. This paper reviews a number of bimetallic or ternary electrocatalytic materials prepared by galvanic replacement for fuel cell, electrolysis and electrosynthesis reactions. These include oxygen reduction, methanol, formic acid and ethanol oxidation, hydrogen evolution and oxidation, oxygen evolution, borohydride oxidation, and halide reduction. Methods for depositing the precursor metal M on the support material (electrodeposition, electroless deposition, photodeposition as well as the various options for the support are also reviewed.

  3. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  4. Telerehabilitation Feasibility in Total Joint Replacement

    Directory of Open Access Journals (Sweden)

    Mark J. Nelson

    2017-11-01

    Full Text Available Despite documented benefits, many Total Joint Replacement (TJR patients find it difficult to access rehabilitation following discharge from hospital. One solution to improve access for TJR patients is telerehabilitation. This study aimed to assess the feasibility of introducing a telerehabilitation program for TJR patients.   TJR patients at QEII Jubilee Hospital were invited to complete a questionnaire regarding their access, feelings towards and preferences in using technology. Seventy-five patients were recruited. Most patients had computer access (72% and internet (69% at home. Sixty-five percent of participants were willing to participate in telerehabilitation. A significant difference was found between older and younger patients. Watching videos on an electronic device was the preferred method for a technology-based home exercise program and phone call the preferred method of communication.  Results indicate telerehabilitation in the TJR population is feasible from the perspective of access to, feelings toward, and preferences for technology. Keywords: Hip replacement, Knee replacement, Telerehabilitation, Telemedicine, Total joint replacement

  5. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1989-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab

  6. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1990-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor

  7. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  8. Partial knee replacement

    Science.gov (United States)

    ... good range of motion in your knee. The ligaments in your knee are stable. However, most people with knee arthritis have a surgery called a total knee arthroplasty (TKA). Knee replacement is most often done in people age 60 ...

  9. Study on reactor vessel replacement (RVR) for 1100 MW class BWR plants in Japan

    International Nuclear Information System (INIS)

    Mizutani, J.; Kawamura, S.; Aoki, M.; Mori, T.

    2001-01-01

    Plant Life Management (PLM) is being studied in Japan, and reactor vessel replacement (RVR) is being considered as one option. Since reactor internals, except for reusable parts, and the reactor pressure vessel (RPV) are replaced, the RVR provides an effective technology for extending the service life of nuclear power plants substantially. At ICONE 7, we reported on the technical viability of the RVR for BWR4-type 800 MWe class plants. This time, we rationalized the RVR method through a study for BWR5-type 1100 MWe class plants to reduce the RVR duration and evaluated the technical viability and the economic efficiency of the method. In addition, we discuss how to dispose of the RPV to complete a scenario of the process from the RVR to its final disposal. (author)

  10. Allotment of aircraft spare parts using genetic alorithms

    Directory of Open Access Journals (Sweden)

    Batchoun Pascale

    2003-01-01

    Full Text Available In this paper we attempt to determine the optimal allocation of aircraft parts used as spares for replacement of defective parts on-board of a departing flight. In order to minimize the cost of delay caused by unexpected failure, Genetic algorithms (GAs are used to allocate the initial quantity of parts among the airports. GAs are a class of adaptive search procedures, that distinguish themselves from other optimization techniques by the use of concepts from population genetics to guide the search. Problem-specific knowledge is incorporated into the problem and efficient parameters are identified and tested for the task of optimizing the allocation of parts. The approach is illustrated by numerical results.

  11. ReplacementMatrix: a web server for maximum-likelihood estimation of amino acid replacement rate matrices.

    Science.gov (United States)

    Dang, Cuong Cao; Lefort, Vincent; Le, Vinh Sy; Le, Quang Si; Gascuel, Olivier

    2011-10-01

    Amino acid replacement rate matrices are an essential basis of protein studies (e.g. in phylogenetics and alignment). A number of general purpose matrices have been proposed (e.g. JTT, WAG, LG) since the seminal work of Margaret Dayhoff and co-workers. However, it has been shown that matrices specific to certain protein groups (e.g. mitochondrial) or life domains (e.g. viruses) differ significantly from general average matrices, and thus perform better when applied to the data to which they are dedicated. This Web server implements the maximum-likelihood estimation procedure that was used to estimate LG, and provides a number of tools and facilities. Users upload a set of multiple protein alignments from their domain of interest and receive the resulting matrix by email, along with statistics and comparisons with other matrices. A non-parametric bootstrap is performed optionally to assess the variability of replacement rate estimates. Maximum-likelihood trees, inferred using the estimated rate matrix, are also computed optionally for each input alignment. Finely tuned procedures and up-to-date ML software (PhyML 3.0, XRATE) are combined to perform all these heavy calculations on our clusters. http://www.atgc-montpellier.fr/ReplacementMatrix/ olivier.gascuel@lirmm.fr Supplementary data are available at http://www.atgc-montpellier.fr/ReplacementMatrix/

  12. 30 CFR 823.14 - Soil replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Soil replacement. 823.14 Section 823.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-OPERATIONS ON PRIME FARMLAND § 823.14 Soil replacement. (a) Soil...

  13. Application of bone scintigrams in total knee replacement (Okayama MK-II type)

    Energy Technology Data Exchange (ETDEWEB)

    Umeda, T.; Inoue, S.; Matsui, N.; Moriya, H. (Chiba Univ. (Japan). School of Medicine)

    1982-02-01

    Eighteen patients with 21 total knee replacements (OKAYAMA MK-II type) were examined by radionuclide imaging in order to assess the prosthetic complaints such as loosening, infection, fracture and lasting pain. The following results and conclusions were obtained. 1) Bone imaging can reveal the condition of the attachment of bone and prosthesis. 2) Diffuse uptake gradually diminished until 18 months after surgery. 3) In front view on bone imaging, tibial uptake corresponded highly with the part of the weight area. 4) In cases of high uptake of posterior femoral component in lateral view, the range of knee flexion was mostly restricted. 5) Long-period persistent local uptake suggested loosening of the prosthesis or fracture of the tibial plateau. 6) Patello-femoral uptake showed no relation to the patellofemoral complaints. Radionuclide bone imaging is considered to represent one of the most valuable diagnostic procedures for assessing the clinical results after total knee replacement.

  14. Application of bone scintigrams in total knee replacement (Okayama MK-II type)

    International Nuclear Information System (INIS)

    Umeda, Tohru; Inoue, Shunichi; Matsui, Nobuo; Moriya, Hideshige

    1982-01-01

    Eighteen patients with 21 total knee replacements (OKAYAMA MK-II type) were examined by radionuclide imaging in order to assess the prosthetic complaints such as loosening, infection, fracture and lasting pain. The following results and conclusions were obtained. 1) Bone imaging can reveal the condition of the attachment of bone and prosthesis. 2) Diffuse uptake gradually diminished until 18 months after surgery. 3) In front view on bone imaging, tibial uptake corresponded highly with the part of the weight area. 4) In cases of high uptake of posterior femoral component in lateral view, the range of knee flexion was mostly restricted. 5) Long-period persistent local uptake suggested loosening of the prosthesis or fracture of the tibial plateau. 6) Patello-femoral uptake showed no relation to the patellofemoral complaints. Radionuclide bone imaging is considered to represent one of the most valuable diagnostic procedures for assessing the clinical results after total knee replacement. (author)

  15. Alternatives to eye bank native tissue for corneal stromal replacement.

    Science.gov (United States)

    Brunette, Isabelle; Roberts, Cynthia J; Vidal, François; Harissi-Dagher, Mona; Lachaine, Jean; Sheardown, Heather; Durr, Georges M; Proulx, Stéphanie; Griffith, May

    2017-07-01

    Corneal blindness is a major cause of blindness in the world and corneal transplantation is the only widely accepted treatment to restore sight in these eyes. However, it is becoming increasingly difficult for eye banks to meet the increasing demand for transplantable tissue, which is in part due to population aging. Donor tissue shortage is therefore a growing concern globally and there is a need for alternatives to human donor corneas. Biosynthetic corneal substitutes offer several significant advantages over native corneas: Large-scale production offers a powerful potential solution to the severe shortage of human donor corneas worldwide; Good manufacturing practices ensure sterility and quality control; Acellular corneal substitutes circumvent immune rejection induced by allogeneic cells; Optical and biomechanical properties of the implants can be adapted to the clinical need; and finally these corneal substitutes could benefit from new advances in biomaterials science, such as surface coating, functionalization and nanoparticles. This review highlights critical contributions from laboratories working on corneal stromal substitutes. It focuses on synthetic inert prostheses (keratoprostheses), acellular scaffolds with and without enhancement of endogenous regeneration, and cell-based replacements. Accent is put on the physical properties and biocompatibility of these biomaterials, on the functional and clinical outcome once transplanted in vivo in animal or human eyes, as well as on the main challenges of corneal stromal replacement. Regulatory and economic aspects are also discussed. All of these perspectives combined highlight the founding principles of the clinical application of corneal stromal replacement, a concept that has now become reality. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Revitalization of the damaged machine parts by hard facing as a way of saving funds

    Directory of Open Access Journals (Sweden)

    Vukić Lazić

    2016-09-01

    Full Text Available The objective of the research, presented in this paper, was to demonstrate the superiority of the hard facing as the revitalization technology of various damaged machine parts. The analysis of the two different revitalization methods of the damaged machine parts is presented – the replacement of the damaged part by the new – spare part and reparation by hard facing. The comparison is done on the example of hard facing and replacing of damaged loader's teeth. The paper presents a method for calculating costs of the two revitalization technologies based on their profitability and their comparison. That method could be applied for similar calculations for any machine part, with smallest or no adjustments. The paper presents a verification of advantage of applying the hard facing as the machine parts reparatory technology with respect to the other revitalization technology. The savings realized by application of hard facing reparation of the loader's teeth reach 73.5 % for one set of teeth and 82.40per annum of the costs for purchasing the new spare parts. The analysis was conducted under an assumption that organization of the maintenance function is at the exceptionally high level so that the purchasing of the new part/repairing of the damaged one is always done in time. This idealized approach was adopted since in that way one obtains the least economic effects of the reparatory technology application with respect to replacing the part with the spare one. In any other case the economic effects would be significantly higher, namely even more positive in favor of the hard facing revitalization technology.

  17. Valve-sparing and valve-replacing techniques for aortic root replacement in patients with Marfan syndrome: Analysis of early outcome.

    Science.gov (United States)

    Volguina, Irina V; Miller, D Craig; LeMaire, Scott A; Palmero, Laura C; Wang, Xing Li; Connolly, Heidi M; Sundt, Thoralf M; Bavaria, Joseph E; Dietz, Harry C; Milewicz, Dianna M; Coselli, Joseph S

    2009-05-01

    A prospective, international registry study was initiated to provide contemporary comparative data on short-term clinical outcomes after aortic valve-sparing and aortic valve-replacing root operations in patients with Marfan syndrome. The purpose of this initial report is to describe the study design and to compare early outcomes in the first 151 enrolled patients. We assessed 30-day outcomes in 151 patients who met strict Ghent diagnostic criteria for Marfan syndrome and underwent aortic root replacement with either valve-replacing (n = 46) or valve-sparing techniques (n = 105) at one of 18 participating centers. In the valve replacement group, a mechanical composite valve graft was used in 39 (85%) patients and a bioprosthetic valve in 7 (15%). In the valve-sparing group, David V procedures were performed in 57 (54%) patients, David I in 38 (36%), David IV in 8 (8%), Florida sleeve in 1 (1%), and Yacoub remodeling in 1 (1%). No in-hospital or 30-day deaths occurred. Despite longer crossclamp and cardiopulmonary bypass times in the valve-sparing group, there were no significant between-group differences in postoperative complications. Thirty-day valve-related complications occurred in 2 (4%) patients undergoing valve replacement and in 3 (3%) undergoing valve-sparing procedures (P = .6). The analysis of early outcomes revealed that valve-sparing techniques were the most common approach to root replacement in patients with Marfan syndrome in these centers. The complexity of valve-sparing root replacement did not translate into any demonstrable adverse early outcomes. Subsequent analysis will compare the 3-year durability of these two surgical approaches.

  18. A Bayesian perspective on age replacement with minimal repair

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Yeh, R.H.; Lin, Y.-B.; Juang, M.-G.

    1999-01-01

    In this article, a Bayesian approach is developed for determining an optimal age replacement policy with minimal repair. By incorporating minimal repair, planned replacement, and unplanned replacement, the mathematical formulas of the expected cost per unit time are obtained for two cases - the infinite-horizon case and the one-replacement-cycle case. For each case, we show that there exists a unique and finite optimal age for replacement under some reasonable conditions. When the failure density is Weibull with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal age replacement policy. Further, various special cases are discussed in detail. Finally, a numerical example is given

  19. 45 CFR 201.70 - Treatment of replacement checks.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Treatment of replacement checks. 201.70 Section... STATES FOR PUBLIC ASSISTANCE PROGRAMS Review and Audits § 201.70 Treatment of replacement checks. (a... (FFP) for replacement checks under titles I, VI-A, X, XIV, XVI (AABD) except under the circumstances...

  20. 30 CFR 56.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 56.12036 Section 56.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... § 56.12036 Fuse removal or replacement. Fuses shall not be removed or replaced by hand in an energized...

  1. Prosthetic liner wear in total hip replacement: a longitudinal 13-year study with computed tomography.

    Science.gov (United States)

    Weidenhielm, Lars; Olivecrona, Henrik; Maguire, Gerald Q; Noz, Marilyn E

    2018-06-01

    This case report follows a woman who had a total hip replacement in 1992 when she was 45 years old. Six serial computed tomography (CT) examinations over a period of 13 years provided information that allowed her revision surgery to be limited to liner replacement as opposed to replacement of the entire prosthesis. Additionally, they provided data that ruled out the presence of osteolysis and indeed none was found at surgery. In 2004, when the first CT was performed, the 3D distance the femoral head had penetrated into the cup was determined to be 2.6 mm. By 2017, femoral head penetration had progressed to 5.0 mm. The extracted liner showed wear at the thinnest part to be 5.5 mm, as measured with a micrometer. The use of modern CT techniques can identify problems, while still correctable without major surgery. Furthermore, the ability of CT to assess the direction of wear revealed that the liner wear changed from the cranial to dorsal direction.

  2. Essential Specification Elements for Heat Exchanger Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Bower, L.

    2015-07-01

    Performance upgrade and equipment degradation are the primary impetuses for a nuclear power plant to engage in the large capital cost project of heat exchanger replacement. Along with attention to these issues, consideration of heat exchanger Codes and Standards, material improvements, thermal redesign, and configuration are essential for developing User’s Design Specifications for successful replacement projects. The User’s Design Specification is the central document in procuring ASME heat exchangers. Properly stated objectives for the heat exchanger replacement are essential for obtaining the materials, configurations and thermal designs best suited for the nuclear power plant. Additionally, the code of construction required and the applied manufacturing standard (TEMA or HEI) affects how the heat exchanger may be designed or configured to meet the replacement goals. Knowledge of how Codes and Standards affect design and configuration details will aid in writing the User’s Design Specification. Joseph Oat Corporation has designed and fabricated many replacement heat exchangers for the nuclear power industry. These heat exchangers have been constructed per ASME Section III to various Code-Years or ASME Section VIII-1 to the current Code-Year also in accordance with TEMA and HEI. These heat exchangers have been a range of like-for-like replacement to complete thermal, material and configuration redesigns. Several examples of these heat exchangers with their Code, Standard and specification implications are presented. (Author.

  3. A replaceable reflective film for solar concentrators

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  4. The timing hypothesis and hormone replacement therapy: a paradigm shift in the primary prevention of coronary heart disease in women. Part 2: comparative risks.

    Science.gov (United States)

    Hodis, Howard N; Mack, Wendy J

    2013-06-01

    A major misperception concerning postmenopausal hormone replacement therapy (HRT) is that the associated risks are large in magnitude and unique to HRT, but over the past 10 years, sufficient data have accumulated so that the magnitude and perspective of risks associated with the primary coronary heart disease prevention therapies of statins, aspirin, and postmenopausal HRT have become more fully defined. Review of randomized controlled trials indicates that the risks of primary prevention therapies and other medications commonly used in women's health are of similar type and magnitude, with the majority of these risks categorized as rare to infrequent (risks of postmenopausal HRT are predominantly rare (risks, including breast cancer, stroke, and venous thromboembolism are common across medications and are rare, and even rarer when HRT is initiated in women younger than 60 or who are less than 10 years since menopause. In Part 1 of this series, the sex-specificity of statins and aspirin and timing of initiation of HRT as modifiers of efficacy in women were reviewed. Herein, the comparative risks of primary prevention therapies in women are discussed. © 2013, Copyright the Authors Journal compilation © 2013, The American Geriatrics Society.

  5. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2006-01-01

    and Unit 2 SGR employs a Medium Lift Crane (MLC) located at ground elevation north of the powerhouse to perform all heavy lifts within the reactor buildings, including relocation of the steam drums and removal and replacement of the Steam Generators, through openings created in the reactor building roof structures. Following the removal of components and systems that interfere with SG replacement activities, the connections between the Steam Generators and the steam drums are severed, the roof of the concrete SD enclosure and the steam drum cooling system are removed, and the steam drums are lifted from the steam drum enclosures and placed on temporary supports to the reactor side of the steam drum enclosures by the MLC. The old Steam Generators are then removed and the replacement Steam Generators are installed through the reactor building roof openings by the MLC. The steam drums and all piping connections and equipment will be reinstalled following the installation of the Replacement Steam Generators to establish the 'as found' condition. The replacement of the eight Steam Generators in each unit is a major part of the Unit 1 and Unit 2 rehabilitation program. This work is currently in progress. The Unit 1 and Unit 2 Steam Generator replacement is a 'first-of-a-kind' project. These are the first CANDU Steam Generators to be replaced, and the horizontal steam drum configuration is unique to Bruce A. This paper provides an overview of the Unit 1 and Unit 2 Steam Generator replacement methodology developed and being employed by SLN. (author)

  6. Replacement Models Revisited | Alabi | Journal of Research in ...

    African Journals Online (AJOL)

    The objective is to review the annual total cost and the cumulative annual total cost average hitherto used as replacement methods. The study showed some disparity in the optimal age of single replacement as used by some authors. Hence, an arithmetic mean method of finding the optimal single- replacement- age of an ...

  7. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    Dunn, J.T.; Kakaria, B.K.

    1982-09-01

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  8. Meal replacements as a strategy for weight loss in obese hemodialysis patients.

    Science.gov (United States)

    Lassemillante, Annie-Claude M; Oliver, Veronica; Hickman, Ingrid; Murray, Eryn; Campbell, Katrina L

    2016-10-01

    Introduction There is currently limited evidence on the use or safety of meal replacements as part of a low- or very-low-calorie diet in patients with renal insufficiency; however, these are occasionally used under dietetic supervision in clinical practice to achieve the desired weight loss for kidney transplant. This case series reports on the safety and efficacy of a weight loss practice utilizing meal replacements among hemodialysis patients, who needed to lose weight for kidney transplant. Methods Five hemodialysis patients were prescribed a modified low-calorie diet (950 kcal and 100 g protein per day) comprising three meal replacements (Optifast ® ), one main meal, and two low-potassium fruits per day. Dietary requirements and restrictions were met for all participants. Dialysis prescriptions, weight (predialysis and postdialysis), interdialytic weight gain, biochemistry, and medications were monitored during the study period for up to 12 months. Findings Participants were aged between 46 and 61 years, and the median time on the low-calorie diet was 364 days. Phosphate binders were temporarily ceased for one participant for reasons unrelated to this program and no other safety concerns were recorded. The low-calorie diet resulted in energy deficits ranging from 1170 kcal to 2160 kcal, and all participants lost weight (median 7% [range 5.2%-11.4%]). The most dramatic weight change appeared to occur by week 12, and declining adherence led to erratic weight change thereafter. Discussion This modified low-calorie diet was safe and effective to use in this population. Meal replacements are a useful weight loss strategy in hemodialysis patients, therefore, offering an alternative to usual weight loss protocols. © 2016 International Society for Hemodialysis.

  9. Transcatheter Aortic Valve Replacement in Europe

    DEFF Research Database (Denmark)

    Mylotte, Darren; Osnabrugge, Ruben L J; Windecker, Stephan

    2013-01-01

    The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy.......The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy....

  10. An abstract machine for module replacement

    OpenAIRE

    Walton, Chris; Krl, Dilsun; Gilmore, Stephen

    1998-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement from the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection.

  11. Aeronautical Information System Replacement -

    Data.gov (United States)

    Department of Transportation — Aeronautical Information System Replacement is a web-enabled, automation means for the collection and distribution of Service B messages, weather information, flight...

  12. Fleet replacement modeling : final report, July 2009.

    Science.gov (United States)

    2009-07-01

    This project focused on two interrelated areas in equipment replacement modeling for fleets. The first area was research-oriented and addressed a fundamental assumption in engineering economic replacement modeling that all assets providing a similar ...

  13. Pannus Formation Leads to Valve Malfunction in the Tricuspid Position 19 Years after Triple Valve Replacement.

    Science.gov (United States)

    Alskaf, Ebraham; McConkey, Hannah; Laskar, Nabila; Kardos, Attila

    2016-06-20

    The Medtronic ATS Open Pivot mechanical valve has been successfully used in heart valve surgery for more than two decades. We present the case of a patient who, 19 years following a tricuspid valve replacement with an ATS prosthesis as part of a triple valve operation following infective endocarditis, developed severe tricuspid regurgitation due to pannus formation.

  14. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  15. Apparatus for fuel replacement

    International Nuclear Information System (INIS)

    Imada, Takahiko.

    1974-01-01

    Object: To support a telescope mast such that no deforming load is applied to it even during massive vibration, it is held fixed at the time of fuel replacement to permit satisfactory remote control operation by automatic operation. Structure: The body of the fuel replacement apparatus is provided with telescope mast fixing means comprising a slide base supported for reciprocal movement with respect to a telescope mast, an operating arm pivoted at the slide base, a wrist member mounted on the free end of the operating arm and an engagement member for restricting the slide base and operating arm at the time of loading and unloading the fuel. When loading and unloading the fuel, the slide base and operating arm are restrained by the engagement member to reliably restrict the vibration of the telescope mast. When the fuel replacement apparatus is moved, the means provided on the operating arm is smoothly displaced to follow the swing (vibration) of the telescope mast to prevent the deforming load from being applied to the support portion or other areas. The wrist member supports the telescope mast such that it can be rotated while restraining movement in the axial direction, and it is provided with revolution drive means for rotating the telescope mast under remote control. (Kamimura, M.)

  16. Mitochondrial replacement techniques: egg donation, genealogy and eugenics.

    Science.gov (United States)

    Palacios-González, César

    2016-03-01

    Several objections against the morality of researching or employing mitochondrial replacement techniques have been advanced recently. In this paper, I examine three of these objections and show that they are found wanting. First I examine whether mitochondrial replacement techniques, research and clinical practice, should not be carried out because of possible harms to egg donors. Next I assess whether mitochondrial replacement techniques should be banned because they could affect the study of genealogical ancestry. Finally, I examine the claim that mitochondrial replacement techniques are not transferring mitochondrial DNA but nuclear DNA, and that this should be prohibited on ethical grounds.

  17. Joint replacement in Zambia: A review of Hip & Knee Replacement ...

    African Journals Online (AJOL)

    Methods: Data captured by the different variables entered into the Joint Register covering the pre-op, intra-op and post-op period of all total hip and knee replacement surgery done at the ZIOH from 1998 to 2010 was entered into a spreadsheet after verification with individual patient medical records. This was then imported ...

  18. Elastodynamic spot testing - assessing serviceability of aging elastomer parts

    International Nuclear Information System (INIS)

    Gracie, B.; Metcalfe, R.; Wensel, R.

    1995-01-01

    The properties of all polymers change with time as a function of their environment. Traditional practice has been to replace these parts according to generic time limits based on estimates of worst case material properties and conditions. This is overly-conservative in many cases, and creates unnecessary maintenance work and costs for replacement and disposal. Much of this could be avoided if the serviceability of elastomeric parts such as seals, diaphragms, gaskets, cable insulation and hoses could be reassessed on a routine basis. Elastodynamic spot testing offers a way to do this. Parts can be sampled while in service or storage to compare their as-new and used (or aged) elastodynamic properties. This data can usually be correlated with the results of functional tests to prove that material properties have not degraded to the point where the part could fail. This spot testing is similar to a micro-hardness test, but includes stress-relaxation and subsequent recovery. It provides a nondestructive means to assess the effective age of the material at a point, or several points, on a part. Sampling of hardness alone is rarely sufficient to know whether a part is still functional because this overlooks the material's viscoelastic and strength properties. An elastodynamic spot tester has been used to test different sizes, shapes and hardnesses of elastomeric parts at different levels of strain, i.e., indentation depths. An initial test program has given informative relaxation and recovery data, showing repeatability and comparing well with finite element analysis of the indentation process. Tests of aged 0-rings and diaphragms have revealed different elastodynamic properties, depending on the elastomer compound and aging conditions. (author)

  19. Cadmium plating replacements

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, M.J.; Groshart, E.C.

    1995-03-01

    The Boeing Company has been searching for replacements to cadmium plate. Two alloy plating systems seem close to meeting the needs of a cadmium replacement. The two alloys, zinc-nickel and tin-zinc are from alloy plating baths; both baths are neutral pH. The alloys meet the requirements for salt fog corrosion resistance, and both alloys excel as a paint base. Currently, tests are being performed on standard fasteners to compare zinc-nickel and tin-zinc on threaded hardware where cadmium is heavily used. The Hydrogen embrittlement propensity of the zinc-nickel bath has been tested, and just beginning for the tin-zinc bath. Another area of interest is the electrical properties on aluminum for tin-zinc and will be discussed. The zinc-nickel alloy plating bath is in production in Boeing Commercial Airplane Group for non-critical low strength steels. The outlook is promising that these two coatings will help The Boeing Company significantly reduce its dependence on cadmium plating.

  20. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1990-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. The methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and is expected to continue operation for at least and additional 25 years. Aging evaluations are in progress to address additional replacements that may be needed during this period

  1. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1989-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. Methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and will continue operation for perhaps another 20 years. Aging evaluations are in program to address additional replacements that may be needed during this extended time period. 3 figs

  2. Anion-sensitive regions of L-type CaV1.2 calcium channels expressed in HEK293 cells.

    Directory of Open Access Journals (Sweden)

    Norbert Babai

    2010-01-01

    Full Text Available L-type calcium currents (I(Ca are influenced by changes in extracellular chloride, but sites of anion effects have not been identified. Our experiments showed that CaV1.2 currents expressed in HEK293 cells are strongly inhibited by replacing extracellular chloride with gluconate or perchlorate. Variance-mean analysis of I(Ca and cell-attached patch single channel recordings indicate that gluconate-induced inhibition is due to intracellular anion effects on Ca(2+ channel open probability, not conductance. Inhibition of CaV1.2 currents produced by replacing chloride with gluconate was reduced from approximately 75%-80% to approximately 50% by omitting beta subunits but unaffected by omitting alpha(2delta subunits. Similarly, gluconate inhibition was reduced to approximately 50% by deleting an alpha1 subunit N-terminal region of 15 residues critical for beta subunit interactions regulating open probability. Omitting beta subunits with this mutant alpha1 subunit did not further diminish inhibition. Gluconate inhibition was unchanged with expression of different beta subunits. Truncating the C terminus at AA1665 reduced gluconate inhibition from approximately 75%-80% to approximately 50% whereas truncating it at AA1700 had no effect. Neutralizing arginines at AA1696 and 1697 by replacement with glutamines reduced gluconate inhibition to approximately 60% indicating these residues are particularly important for anion effects. Expressing CaV1.2 channels that lacked both N and C termini reduced gluconate inhibition to approximately 25% consistent with additive interactions between the two tail regions. Our results suggest that modest changes in intracellular anion concentration can produce significant effects on CaV1.2 currents mediated by changes in channel open probability involving beta subunit interactions with the N terminus and a short C terminal region.

  3. Efficient rehabilitation care for joint replacement patients: skilled nursing facility or inpatient rehabilitation facility?

    Science.gov (United States)

    Tian, Wenqiang; DeJong, Gerben; Horn, Susan D; Putman, Koen; Hsieh, Ching-Hui; DaVanzo, Joan E

    2012-01-01

    There has been lengthy debate as to which setting, skilled nursing facility (SNF) or inpatient rehabilitation facility (IRF), is more efficient in treating joint replacement patients. This study aims to determine the efficiency of rehabilitation care provided by SNF and IRF to joint replacement patients with respect to both payment and length of stay (LOS). This study used a prospective multisite observational cohort design. Tobit models were used to examine the association between setting of care and efficiency. The study enrolled 948 knee replacement patients and 618 hip replacement patients from 11 IRFs and 7 SNFs between February 2006 and February 2007. Output was measured by motor functional independence measure (FIM) score at discharge. Efficiency was measured in 3 ways: payment efficiency, LOS efficiency, and stochastic frontier analysis efficiency. IRF patients incurred higher expenditures per case but also achieved larger motor FIM gains in shorter LOS than did SNF patients. Setting of care was not a strong predictor of overall efficiency of rehabilitation care. Great variation in characteristics existed within IRFs or SNFs and severity groups. Medium-volume facilities among both SNFs and IRFs were most efficient. Early rehabilitation was consistently predictive of efficient treatment. The advantage of either setting is not clear-cut. Definition of efficiency depends in part on preference between cost and time. SNFs are more payment efficient; IRFs are more LOS efficient. Variation within SNFs and IRFs blurred setting differences; a simple comparison between SNF and IRF may not be appropriate.

  4. Renal replacement therapy in healthy adult horses.

    Science.gov (United States)

    Wong, D M; Witty, D; Alcott, C J; Sponseller, B A; Wang, C; Hepworth, K

    2013-01-01

    Renal replacement therapy (RRT) has been implemented extensively in people to facilitate recovery from acute renal failure (ARF). RRT has not been explored in horses, but might provide a further treatment option in horses with ARF. To investigate efficacy and safety of RRT in horses. Five healthy adult horses. A prospective study was performed on horses restrained in stocks and intravenously connected to a commercial RRT machine to allow continuous venovenous hemodiafiltration to be performed for 6 hours. The RRT machine was set at the following flow rates: blood flow rate 250 mL/min; dialysate rate 3,000 mL/h; prefilter replacement pump 3,000 mL/h; and postfilter replacement pump rate 2,000 mL/h. Balanced electrolyte solution was used as dialysate and replacement fluid. Heart rate, respiratory rate, body temperature, direct arterial blood pressure, urine output, and various clinicopathologic parameters were measured over the study period. Renal replacement therapy was successfully performed in horses, resulting in a mean creatinine clearance of 0.127 mL/kg/min (68.9 mL/min) and urea reduction ratio of 24%. No adverse effects were detected although a significant decrease in rectal temperature was observed (P ≤ .007). A significant increase in serum phosphorus (P ≤ .001) and decrease in BUN (P replacement therapy can safely and effectively be used in adult horses. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  5. Partical replacement of the rooting procedure of Chrysanthenum merifolium cuttings by pre-rooting storage in the dark.

    NARCIS (Netherlands)

    Pol, van de P.A.

    1988-01-01

    Part of the rooting procedure of Chrysanthemum morifolium 'Pink Boston' and 'Refour' cuttings can be replaced by pre-rooting storage in the dark. Pre-rooting storage of 7 days at temperatures between 9° and 21°C was adequate. Longer periods of dark storage resulted in increase of root growth but

  6. Avascular necrosis of bone complicating corticosteroid replacement therapy.

    OpenAIRE

    Williams, P L; Corbett, M

    1983-01-01

    Two patients who developed widespread severe avascular necrosis of bone while on steroid replacement therapy are described. One, a diabetic, underwent yttrium-90 pituitary ablation for retinopathy and developed avascular necrosis within 18 months of starting prednisolone. The other, who had Addison's disease, developed avascular necrosis within 14 months of starting cortisol replacement therapy. Both cases came to bilateral total hip replacement.

  7. THE AGGREGATE IMPLICATIONS OF MACHINE REPLACEMENT: THEORY AND EVIDENCE

    OpenAIRE

    John Haltiwanger; Russell Cooper

    1992-01-01

    The authors study an economy in which producers incur resource costs to replace depreciated machines. The process of costly replacement and depreciation creates endogenous fluctuations in productivity, employment, and output of a single producer. The authors explore the spillover effects of machine replacement on other sectors of the economy and provide conditions for synchronized machine replacement by multiple independent producers. The implications of their model are generally consistent w...

  8. The optimal number of heifer calves to be reared as dairy replacements.

    Science.gov (United States)

    Mohd Nor, N; Steeneveld, W; Mourits, M C M; Hogeveen, H

    2015-02-01

    Dairy farmers often keep almost all their newborn heifer calves despite the high cost of rearing. By rearing all heifer calves, farmers have more security and retain flexibility to cope with the uncertainty in the availability of replacement heifers in time. This uncertainty is due to mortality or infertility during the rearing period and the variation in culling rate of lactating cows. The objective of this study is to provide insight in the economically optimal number of heifer calves to be reared as replacements. A herd-level stochastic simulation model was developed specific for this purpose with a herd of 100 dairy cows; the biological part of the model consisted of a dairy herd unit and rearing unit for replacement heifers. The dairy herd unit included variation in the number of culled dairy cows. The rearing unit incorporated variation in the number of heifers present in the herd by including uncertainty in mortality and variation in fertility. The dairy herd unit and rearing unit were linked by the number of replacement heifers and culled dairy cows. When not enough replacement heifers were available to replace culled dairy cows, the herd size was temporarily reduced, resulting in an additional cost for the empty slots. When the herd size reached 100 dairy cows, the available replacement heifers that were not needed were sold. It was assumed that no purchase of cows and calves occurred. The optimal percentage of 2-wk-old heifer calves to be retained was defined as the percentage of heifer calves that minimized the average net costs of rearing replacement heifers. In the default scenario, the optimal retention was 73% and the total net cost of rearing was estimated at €40,939 per herd per year. This total net cost was 6.5% lower than when all heifer calves were kept. An earlier first-calving age resulted in an optimal retention of 75%, and the net costs of rearing were €581 per herd per year lower than in the default scenario. For herds with a lower or

  9. A.R.T. – Aggression Replacement Training

    DEFF Research Database (Denmark)

    Harbo, Lotte Junker; Domben, Eskil

    2015-01-01

    Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training.......Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training....

  10. Optimal timing for intravascular administration set replacement.

    Science.gov (United States)

    Ullman, Amanda J; Cooke, Marie L; Gillies, Donna; Marsh, Nicole M; Daud, Azlina; McGrail, Matthew R; O'Riordan, Elizabeth; Rickard, Claire M

    2013-09-15

    The tubing (administration set) attached to both venous and arterial catheters may contribute to bacteraemia and other infections. The rate of infection may be increased or decreased by routine replacement of administration sets. This review was originally published in 2005 and was updated in 2012. The objective of this review was to identify any relationship between the frequency with which administration sets are replaced and rates of microbial colonization, infection and death. We searched The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library 2012, Issue 6), MEDLINE (1950 to June 2012), CINAHL (1982 to June 2012), EMBASE (1980 to June 2012), reference lists of identified trials and bibliographies of published reviews. The original search was performed in February 2004. We also contacted researchers in the field. We applied no language restriction. We included all randomized or controlled clinical trials on the frequency of venous or arterial catheter administration set replacement in hospitalized participants. Two review authors assessed all potentially relevant studies. We resolved disagreements between the two review authors by discussion with a third review author. We collected data for seven outcomes: catheter-related infection; infusate-related infection; infusate microbial colonization; catheter microbial colonization; all-cause bloodstream infection; mortality; and cost. We pooled results from studies that compared different frequencies of administration set replacement, for instance, we pooled studies that compared replacement ≥ every 96 hours versus every 72 hours with studies that compared replacement ≥ every 48 hours versus every 24 hours. We identified 26 studies for this updated review, 10 of which we excluded; six did not fulfil the inclusion criteria and four did not report usable data. We extracted data from the remaining 18 references (16 studies) with 5001 participants: study designs included neonate and adult

  11. Some economic aspects of steam generator replacements in nuclear power plants

    International Nuclear Information System (INIS)

    Lebegner, J.

    1995-01-01

    The steam generator replacements performed over last decade (about 25 replacements until now), indicate trends towards improved techniques, shorter schedules and reduced total exposure and total costs. The goal of this paper is to give a worldwide review of SG replacement experience with accent on the economic aspect of the SG replacement. The main information about carried out replacements will be presented: cost, schedules, exposures, SG supplier and type, date of replacement, etc. Furthermore, the paper will contain the list of planned steam generator replacements in Europe, Japan and US future replacement plans. Finally, some of NPPs will be described whose initial nominal power has been increased along with SG replacement. (author)

  12. Project W-320, 241-C-106 waste retrieval spare parts list

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    Spare parts for equipment installed in the tank dome space or pump or valve pits should not be inventoried onsite due to the extensive, time-consuming work package planning, personnel/equipment mobilization, and funding requirements that are prerequisites to any repair or replacement. These issues provide adequate time to procure parts from offsite sources. All parts listed in this inventory can either be stocked in the DynCorp Tri-Cities Services, Inc., 2101-M Warehouse, or are available from the vendor/manufacturer

  13. Project W-320, 241-C-106 waste retrieval spare parts list

    Energy Technology Data Exchange (ETDEWEB)

    Hays, W.H.

    1998-03-23

    Spare parts for equipment installed in the tank dome space or pump or valve pits should not be inventoried onsite due to the extensive, time-consuming work package planning, personnel/equipment mobilization, and funding requirements that are prerequisites to any repair or replacement. These issues provide adequate time to procure parts from offsite sources. All parts listed in this inventory can either be stocked in the DynCorp Tri-Cities Services, Inc., 2101-M Warehouse, or are available from the vendor/manufacturer.

  14. Replacing fuel alignment in Germany

    International Nuclear Information System (INIS)

    Poetz, F.; Kalthoff, W.

    1991-01-01

    Up to the end of 1989 varying numbers of broken fuel alignment pins were detected in several German PWRs (80 broken pins in all). The distribution of these broken pins over the core cross-section was more or less random. The problem was due to the stress corrosion cracking of the pin material and was restricted to individual pins. It was concluded that all fuel alignment pins made of Inconel X-750 should be replaced. The development of a new pin, more resistant to intergranular stress corrosion, and the replacement technique are outlined. (author)

  15. HST Replacement Battery Initial Performance

    Science.gov (United States)

    Krol, Stan; Waldo, Greg; Hollandsworth, Roger

    2009-01-01

    The Hubble Space Telescope (HST) original Nickel-Hydrogen (NiH2) batteries were replaced during the Servicing Mission 4 (SM4) after 19 years and one month on orbit.The purpose of this presentation is to highlight the findings from the assessment of the initial sm4 replacement battery performance. The batteries are described, the 0 C capacity is reviewed, descriptions, charts and tables reviewing the State Of Charge (SOC) Performance, the Battery Voltage Performance, the battery impedance, the minimum voltage performance, the thermal performance, the battery current, and the battery system recharge ratio,

  16. Insurance for replacement power costs

    International Nuclear Information System (INIS)

    Cleaver, A.

    1980-01-01

    Although careful consideration is given to insurance against physical damage to plant and equipment, little thought is given to the costs that will be incurred in replacing the power that is lost while a relatively efficient system is out of action. The results of an investigation carried out for a generating authority with an installed capacity of about 3000 MW is given. Replacement power costs for different cases of severity of damage range from Pound1.17m per month for damage to central services taking out all four units. (author)

  17. Contribution of V(H replacement products in mouse antibody repertoire.

    Directory of Open Access Journals (Sweden)

    Lin Huang

    Full Text Available VH replacement occurs through RAG-mediated recombination between the cryptic recombination signal sequence (cRSS near the 3' end of a rearranged VH gene and the 23-bp RSS from an upstream unrearranged VH gene. Due to the location of the cRSS, VH replacement leaves a short stretch of nucleotides from the previously rearranged VH gene at the newly formed V-D junction, which can be used as a marker to identify VH replacement products. To determine the contribution of VH replacement products to mouse antibody repertoire, we developed a Java-based VH Replacement Footprint Analyzer (VHRFA program and analyzed 17,179 mouse IgH gene sequences from the NCBI database to identify VH replacement products. The overall frequency of VH replacement products in these IgH genes is 5.29% based on the identification of pentameric VH replacement footprints at their V-D junctions. The identified VH replacement products are distributed similarly in IgH genes using most families of VH genes, although different families of VH genes are used differentially. The frequencies of VH replacement products are significantly elevated in IgH genes derived from several strains of autoimmune prone mice and in IgH genes encoding autoantibodies. Moreover, the identified VH replacement footprints in IgH genes from autoimmune prone mice or IgH genes encoding autoantibodies preferentially encode positively charged amino acids. These results revealed a significant contribution of VH replacement products to the diversification of antibody repertoire and potentially, to the generation of autoantibodies in mice.

  18. Replacing Recipe Realism

    OpenAIRE

    Saatsi, J

    2017-01-01

    Many realist writings exemplify the spirit of ‘recipe realism’. Here I characterise recipe realism, challenge it, and propose replacing it with ‘exemplar realism’. This alternative understanding of realism is more piecemeal, robust, and better in tune with scientists’ own attitude towards their best theories, and thus to be preferred.

  19. Estimating the shear strength of concrete with coarse aggregate replacement

    OpenAIRE

    Folagbade Olusoga Peter ORIOLA; George MOSES; Jacob Oyeniyi AFOLAYAN; John Engbonye SANI

    2017-01-01

    For economic, environmental and practical reasons, it is desirable to replace the constituents of concrete with wastes and cheaper alternative materials. However, it is best when such replacements are done at optimum replacement levels. In view of this, a laboratory investigative test was carried out to evaluate the shear strength of concrete with coarse aggregate replacement by Coconut Shell and by Waste Rubber Tyre. The coarse aggregate replacement was done at recommended optimum proportion...

  20. Differences in the stress distribution in the distal femur between patellofemoral joint replacement and total knee replacement: a finite element study

    Directory of Open Access Journals (Sweden)

    van Jonbergen Hans-Peter W

    2012-06-01

    Full Text Available Abstract Background Patellofemoral joint replacement is a successful treatment option for isolated patellofemoral osteoarthritis. However, results of later conversion to total knee replacement may be compromised by periprosthetic bone loss. Previous clinical studies have demonstrated a decrease in distal femoral bone mineral density after patellofemoral joint replacement. It is unclear whether this is due to periprosthetic stress shielding. The main objective of the current study was to evaluate the stress shielding effect of prosthetic replacement with 2 different patellofemoral prosthetic designs and with a total knee prosthesis. Methods We developed a finite element model of an intact patellofemoral joint, and finite element models of patellofemoral joint replacement with a Journey PFJ prosthesis, a Richards II prosthesis, and a Genesis II total knee prosthesis. For each of these 4 finite element models, the average Von Mises stress in 2 clinically relevant regions of interest were evaluated during a simulated squatting movement until 120 degrees of flexion. Results During deep knee flexion, in the anterior region of interest, the average Von Mises stress with the Journey PFJ design was comparable to the physiological knee, while reduced by almost 25% for both the Richards II design and the Genesis II total knee joint replacement design. The average Von Mises stress in the supracondylar region of interest was similar for both patellofemoral prosthetic designs and the physiological model, with slightly lower stress for the Genesis II design. Conclusions Patellofemoral joint replacement results in periprosthetic stress-shielding, although to a smaller degree than in total knee replacement. Specific patellofemoral prosthetic design properties may result in differences in femoral stress shielding.

  1. Differences in the stress distribution in the distal femur between patellofemoral joint replacement and total knee replacement: a finite element study

    Science.gov (United States)

    2012-01-01

    Background Patellofemoral joint replacement is a successful treatment option for isolated patellofemoral osteoarthritis. However, results of later conversion to total knee replacement may be compromised by periprosthetic bone loss. Previous clinical studies have demonstrated a decrease in distal femoral bone mineral density after patellofemoral joint replacement. It is unclear whether this is due to periprosthetic stress shielding. The main objective of the current study was to evaluate the stress shielding effect of prosthetic replacement with 2 different patellofemoral prosthetic designs and with a total knee prosthesis. Methods We developed a finite element model of an intact patellofemoral joint, and finite element models of patellofemoral joint replacement with a Journey PFJ prosthesis, a Richards II prosthesis, and a Genesis II total knee prosthesis. For each of these 4 finite element models, the average Von Mises stress in 2 clinically relevant regions of interest were evaluated during a simulated squatting movement until 120 degrees of flexion. Results During deep knee flexion, in the anterior region of interest, the average Von Mises stress with the Journey PFJ design was comparable to the physiological knee, while reduced by almost 25% for both the Richards II design and the Genesis II total knee joint replacement design. The average Von Mises stress in the supracondylar region of interest was similar for both patellofemoral prosthetic designs and the physiological model, with slightly lower stress for the Genesis II design. Conclusions Patellofemoral joint replacement results in periprosthetic stress-shielding, although to a smaller degree than in total knee replacement. Specific patellofemoral prosthetic design properties may result in differences in femoral stress shielding. PMID:22704638

  2. Results of a Phase 2 Study Examining the Effects of Omitting Elective Neck Irradiation to Nodal Levels IV and V{sub b} in Patients With N{sub 0-1} Nasopharyngeal Carcinoma

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Jian-zhou [Department of Radiation Oncology, Cancer Hospital of Shantou University Medical College, Shantou, Guangdong (China); Le, Quynh-Thu [Department of Radiation Oncology, Stanford University School of Medicine, Stanford, California (United States); Han, Fei; Lu, Li-Xia; Huang, Shao-Min; Lin, Cheng-Guang; Deng, Xiao-Wu; Cui, Nian-Ji [State Key Laboratory of Oncology in South China, Department of Radiation Oncology, Cancer Center of Sun Yat-Sen University, Guangzhou, Guangdong (China); Zhao, Chong, E-mail: gzzhaochong@hotmail.com [State Key Laboratory of Oncology in South China, Department of Radiation Oncology, Cancer Center of Sun Yat-Sen University, Guangzhou, Guangdong (China)

    2013-03-15

    Purpose: To evaluate the patterns of nodal failure and toxicity in clinically negative necks of N{sub 0-1} nasopharyngeal carcinoma (NPC) patients who were treated with intensity modulated radiation therapy (IMRT) but did not receive elective neck irradiation (ENI) to level IV and V{sub b} nodes. Methods and Materials: We conducted a phase 2 prospective study in N{sub 0-1} NPC patients treated with IMRT. ENI included the retropharyngeal nodes and levels II to V{sub a} but omitted levels IV and V{sub b} in clinically negative necks. Patterns of nodal failure, regional control (RC), and late toxicity were evaluated. Results: Between 2001 and 2008, a total of 212 patients (128 N{sub 0} and 84 N{sub 1}) were enrolled in the study. Seven patients (4 in-field and 3 out-of-field) developed nodal failure. One patient (0.5%) developed nodal failure at level V{sub b}, but no patients developed nodal failure at level IV. The 5-year RC rates of the entire group, N{sub 0} patients and N{sub 1} patients were 95.6%, 98.2%, and 91.3%, respectively. Fifteen patients (7.1%) developed distant metastases. The 5-year distant failure-free survival (DFFS) and overall survival (OS) rates were 91.4% and 89.8%, respectively. The rates of grade 2 or greater skin dystrophy, subcutaneous fibrosis and xerostomia were 6.2%, 16.6%, and 17.9%, respectively. Conclusions: The rate of out-of-field nodal failure when omitting ENI to levels IV and V{sub b} in clinically negative necks of patients with N{sub 0-1} NPC was extremely low; therefore, a further phase 3 study is warranted.

  3. Strategic vehicle fleet management - the replacement problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2016-03-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the third one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Material and methods: The paper discusses ways of building replacement strategies for companies' fleets of vehicles. It means deciding for how long to exploit particular vehicles in a fleet (the fleet replacement problem - FR. The essence of this problem lies in the minimization of vehicle / fleet exploitation costs by balancing ownership and utilization costs and taking into account budget limitations. In the paper an original mathematical model (an optimization method allowing for the FR analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows that there exist optimal exploitation periods of particular vehicles in a fleet. However, combination of them gives a replacement plan for an entire fleet violating budget constraints. But it is possible to adjust individual age to replacement of particular vehicles to fulfill budget constraints without losing economical optimality of a developed replacement plan for an entire fleet. Conclusions: The paper is the last one of a series of three papers that the author dedicated to the strategic vehicle fleet management topic including the following managerial decision problems: MAKE-or-BUY, sizing / composition and replacement.

  4. Evaluation of Inulin Replacing Chitosan in a Polyurethane/Polysaccharide Material for Pb2+ Removal.

    Science.gov (United States)

    Hernández-Martínez, Angel Ramon; Molina, Gustavo A; Jiménez-Hernández, Luis Fernando; Oskam, Adrian Hendrik; Fonseca, Gerardo; Estevez, Miriam

    2017-11-29

    Downstream waste from industry and other industrial processes could increase concentration of heavy metals in water. These pollutants are commonly removed by adsorption because it is an effective and economical method. Previously, we reported adsorption capacity of a chitosan/polyurethane/titanium dioxide (TiO₂) composite for three ions in a dynamic wastewater system. There, increasing the chitosan concentration in composite increased the cation removal as well; however, for ratios higher than 50% of chitosan/TiO₂, the manufacturing cost increased significantly. In this work, we address the manufacturing cost problem by proposing a new formulation of the composite. Our hypothesis is that inulin could replace chitosan in the composite formulation, either wholly or in part. In this exploratory research, three blends were prepared with a polyurethane matrix using inulin or/and chitosan. Adsorption was evaluated using a colorimetric method and the Langmuir and Freundlich models. Fourier-transform infrared spectroscopy (FTIR) spectra, scanning electron microscopy (SEM) micrographs, differential scanning calorimetry and thermogravimetric analysis curves were obtained to characterize blends. Results indicate that blends are suitable for toxic materials removal (specifically lead II, Pb 2+ ). Material characterization indicates that polysaccharides were distributed in polyurethane's external part, thus improving adsorption. Thermal degradation of materials was found above 200 °C. Comparing the blends data, inulin could replace chitosan in part and thereby improve the cost efficiency and scalability of the production process of the polyurethane based-adsorbent. Further research with different inulin/chitosan ratios in the adsorbent and experiments with a dynamic system are justified.

  5. Evaluation of Inulin Replacing Chitosan in a Polyurethane/Polysaccharide Material for Pb2+ Removal

    Directory of Open Access Journals (Sweden)

    Angel Ramon Hernández-Martínez

    2017-11-01

    Full Text Available Downstream waste from industry and other industrial processes could increase concentration of heavy metals in water. These pollutants are commonly removed by adsorption because it is an effective and economical method. Previously, we reported adsorption capacity of a chitosan/polyurethane/titanium dioxide (TiO2 composite for three ions in a dynamic wastewater system. There, increasing the chitosan concentration in composite increased the cation removal as well; however, for ratios higher than 50% of chitosan/TiO2, the manufacturing cost increased significantly. In this work, we address the manufacturing cost problem by proposing a new formulation of the composite. Our hypothesis is that inulin could replace chitosan in the composite formulation, either wholly or in part. In this exploratory research, three blends were prepared with a polyurethane matrix using inulin or/and chitosan. Adsorption was evaluated using a colorimetric method and the Langmuir and Freundlich models. Fourier-transform infrared spectroscopy (FTIR spectra, scanning electron microscopy (SEM micrographs, differential scanning calorimetry and thermogravimetric analysis curves were obtained to characterize blends. Results indicate that blends are suitable for toxic materials removal (specifically lead II, Pb2+. Material characterization indicates that polysaccharides were distributed in polyurethane’s external part, thus improving adsorption. Thermal degradation of materials was found above 200 °C. Comparing the blends data, inulin could replace chitosan in part and thereby improve the cost efficiency and scalability of the production process of the polyurethane based-adsorbent. Further research with different inulin/chitosan ratios in the adsorbent and experiments with a dynamic system are justified.

  6. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Science.gov (United States)

    2010-10-01

    ... equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT... Special Items 908.7112 Materials handling equipment replacement standards. Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405...

  7. Postmenopausal hormone replacement therapy--clinical implications

    DEFF Research Database (Denmark)

    Ravn, S H; Rosenberg, J; Bostofte, E

    1994-01-01

    The menopause is defined as cessation of menstruation, ending the fertile period. The hormonal changes are a decrease in progesterone level, followed by a marked decrease in estrogen production. Symptoms associated with these hormonal changes may advocate for hormonal replacement therapy....... This review is based on the English-language literature on the effect of estrogen therapy and estrogen plus progestin therapy on postmenopausal women. The advantages of hormone replacement therapy are regulation of dysfunctional uterine bleeding, relief of hot flushes, and prevention of atrophic changes...... in the urogenital tract. Women at risk of osteoporosis will benefit from hormone replacement therapy. The treatment should start as soon after menopause as possible and it is possible that it should be maintained for life. The treatment may be supplemented with extra calcium intake, vitamin D, and maybe calcitonin...

  8. THE REPLACEMENT-RENEWAL OF INDUSTRIAL EQUIPMENTS. THE MAPI FORMULAS

    Directory of Open Access Journals (Sweden)

    Meo Colombo Carlotta

    2010-07-01

    Full Text Available Since the production has been found to be an economical means for satisfying human wants, this process requires a complex industrial organization together with a large investment in equipments, plants and productive systems. These productive systems are employed to alter the physical environment and create consumer goods. As a result, they are consumed or become obsolete, inadequate, or otherwise candidates for replacement. When replacement is being considered, two assets must be evaluated: the present asset, the defender and its potential replacement, the challenger. Since the success of an industrial organization depends upon profit, replacement should generally occur if an economic advantage will result. Whatever the reason leading to the consideration of replacement, the analysis and decisions must be based upon estimates of what will occur in the future. In this paper we present the Mapi algorithm as a procedure for evaluating investments or for analyzing replacement opportunities.

  9. A useful framework for optimal replacement models

    International Nuclear Information System (INIS)

    Aven, Terje; Dekker, Rommert

    1997-01-01

    In this note we present a general framework for optimization of replacement times. It covers a number of models, including various age and block replacement models, and allows a uniform analysis for all these models. A relation to the marginal cost concept is described

  10. Adjacent level effects of bi level disc replacement, bi level fusion and disc replacement plus fusion in cervical spine--a finite element based study.

    Science.gov (United States)

    Faizan, Ahmad; Goel, Vijay K; Biyani, Ashok; Garfin, Steven R; Bono, Christopher M

    2012-03-01

    Studies delineating the adjacent level effect of single level disc replacement systems have been reported in literature. The aim of this study was to compare the adjacent level biomechanics of bi-level disc replacement, bi-level fusion and a construct having adjoining level disc replacement and fusion system. In total, biomechanics of four models- intact, bi level disc replacement, bi level fusion and fusion plus disc replacement at adjoining levels- was studied to gain insight into the effects of various instrumentation systems on cranial and caudal adjacent levels using finite element analysis (73.6N+varying moment). The bi-level fusion models are more than twice as stiff as compared to the intact model during flexion-extension, lateral bending and axial rotation. Bi-level disc replacement model required moments lower than intact model (1.5Nm). Fusion plus disc replacement model required moment 10-25% more than intact model, except in extension. Adjacent level motions, facet loads and endplate stresses increased substantially in the bi-level fusion model. On the other hand, adjacent level motions, facet loads and endplate stresses were similar to intact for the bi-level disc replacement model. For the fusion plus disc replacement model, adjacent level motions, facet loads and endplate stresses were closer to intact model rather than the bi-level fusion model, except in extension. Based on our finite element analysis, fusion plus disc replacement procedure has less severe biomechanical effects on adjacent levels when compared to bi-level fusion procedure. Bi-level disc replacement procedure did not have any adverse mechanical effects on adjacent levels. Copyright © 2011 Elsevier Ltd. All rights reserved.

  11. A comparison of minimally invasive and standard aortic valve replacement.

    Science.gov (United States)

    Stoliński, Jarosław; Plicner, Dariusz; Grudzień, Grzegorz; Wąsowicz, Marcin; Musiał, Robert; Andres, Janusz; Kapelak, Bogusław

    2016-10-01

    The study objective was to compare aortic valve replacement through a right anterior minithoracotomy with aortic valve replacement through a median sternotomy. With propensity score matching, we selected 211 patients after aortic valve replacement through a right anterior minithoracotomy and 211 patients after aortic valve replacement who underwent operation between January 2010 and December 2013. Perioperative outcomes were analyzed, and multivariable logistic regression analysis of risk factors of postoperative morbidity was performed. For propensity score-matched patients, hospital mortality was 1.0% in the aortic valve replacement through a right anterior minithoracotomy group and 1.4% in the aortic valve replacement group (P = 1.000). Stroke occurred in 0.5% versus 1.4% (P = .615), myocardial infarction occurred in 1.4% versus 1.9% (P = 1.000), and new onset of atrial fibrillation occurred in 12.8% versus 24.2% (P = .003) of patients in the aortic valve replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Postoperative drainage was 353.5 ± 248.6 mL versus 544.3 ± 324.5 mL (P replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Mediastinitis occurred in 2.8% of patients after aortic valve replacement and in 0.0% of patients after aortic valve replacement through a right anterior minithoracotomy surgery (P = .040). Intensive care unit stay (1.3 ± 1.2 days vs 2.6 ± 2.6 days) and hospital stay (5.7 ± 1.6 days vs 8.7 ± 4.4 days) were statistically significantly shorter in the aortic valve replacement through a right anterior minithoracotomy group. Aortic valve replacement through a right anterior minithoracotomy surgery resulted in reduced postoperative morbidity (odds ratio, 0.4; P replacement through a right anterior minithoracotomy surgery resulted in a reduced infection rate, diminished postoperative bleeding and blood

  12. Rehabilitation after total joint replacement: a scoping study.

    Science.gov (United States)

    L Snell, Deborah; Hipango, Julia; Sinnott, K Anne; Dunn, Jennifer A; Rothwell, Alastair; Hsieh, C Jean; DeJong, Gerben; Hooper, Gary

    2018-07-01

    The evidence supporting rehabilitation after joint replacement, while vast, is of variable quality making it difficult for clinicians to apply the best evidence to their practice. We aimed to map key issues for rehabilitation following joint replacement, highlighting potential avenues for new research. We conducted a scoping study including research published between January 2013 and December 2016, evaluating effectiveness of rehabilitation following hip and knee total joint replacement. We reviewed this work in the context of outcomes described from previously published research. Thirty individual studies and seven systematic reviews were included, with most research examining the effectiveness of physiotherapy-based exercise rehabilitation after total knee replacement using randomized control trial methods. Rehabilitation after hip and knee replacement whether carried out at the clinic or monitored at home, appears beneficial but type, intensity and duration of interventions were not consistently associated with outcomes. The burden of comorbidities rather than specific rehabilitation approach may better predict rehabilitation outcome. Monitoring of recovery and therapeutic attention appear important but little is known about optimal levels and methods required to maximize outcomes. More work exploring the role of comorbidities and key components of therapeutic attention and the therapy relationship, using a wider range of study methods may help to advance the field. Implications for Rehabilitation Physiotherapy-based exercise rehabilitation after total hip replacement and total knee replacement, whether carried out at the clinic or monitored at home, appears beneficial. Type, intensity, and duration of interventions do not appear consistently associated with outcomes. Monitoring a patient's recovery appears to be an important component. The available research provides limited guidance regarding optimal levels of monitoring needed to achieve gains following hip

  13. Radiographic inspection. Film replacement with digital detector arrays in aerospace applications

    International Nuclear Information System (INIS)

    Schulte, Frank; Bavendiek, Klaus

    2016-01-01

    The new Digital Radiographic Inspection method replace more and more the conventional Film technique. For DDA (Digital Detector Array) systems it is currently necessary to use automated or semi-automated systems. For CR (Computer Radiography) Systems the conventional Film Systems may be used. For this CR technique operators can use same X-Ray Units (Bunker) and same X-Ray equipment. But on CR technique we have basically the same settings like the Film-based technique. More or less same exposure times and for aerospace application long scanning times for the CR foils. In fact there is no big benefit in capacity or in economical view. Regarding this issue we thought about the option to use a DDA System instead of a Film or CR System to use the current Film Equipment (Bunker, Generator, Tube.) and replace this 1:1 by a manual system. In this time only small detectors with fine pixel pitch was available on the market. With this type of DDA's is was absolutely uneconomical to inspect parts in serial inspection. Therefore a new generation of DDA's were developed, which is able to replace Film or CR System 1:1 with adequate economical properties for specific applications. The new PerkinElmer XRD 1611 Panel has a size of 40 x 40 cm and a pixel pitch of 100 μm. The baseline for the new DDA Panel was the most used X-Ray Film in size 30 x 40 cm. The Pixel Pitch and requirements for Bad Pixel based on the requirements for spatial resolution of the applicable ASTM standards and different customer specifications for castings. With this new DDA System is it possible to inspect small and medium castings in very short time with excellent image quality. The System is able to process images under 1 minute include averaging. Images will be transferred by a specific software tool to an offline reading station where certified Level 2 operator can inspect the images. Images will be archived as 16bit DICONDE File. All relevant images information are included in DICONDE File

  14. 21 CFR 870.3710 - Pacemaker repair or replacement material.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Pacemaker repair or replacement material. 870.3710... (CONTINUED) MEDICAL DEVICES CARDIOVASCULAR DEVICES Cardiovascular Prosthetic Devices § 870.3710 Pacemaker repair or replacement material. (a) Identification. A pacemaker repair or replacement material is an...

  15. Tool Inventory and Replacement

    Science.gov (United States)

    Bear, W. Forrest

    1976-01-01

    Vocational agriculture teachers are encouraged to evaluate curriculum offerings, the new trends in business and industry, and develop a master tool purchase and replacement plan over a 3- to 5-year period. (HD)

  16. Multi-stage type replacing method of iodine filter

    International Nuclear Information System (INIS)

    Kitamura, Masao; Kamiya, Kunio.

    1976-01-01

    Object: To effectively replace a filter into a removing device of radioactive impurities used in ventilation and air conditioning system or the like in an atomic power plant. Structure: A plurality of elements of a filter are arranged in series relative to fluid. In the first replacement, an ante-filter-element on inlet side of fluid is removed, and a post-filter-element is repositioned to that position of the ante-element. Then, a fresh element is newly mounted on that position of the post-element. Replacement after the second time may be effected by repeating the operation noted above. With this arrangement, the minimal value of collection efficiency at replacement of filter may be increased. (Ikeda, J.)

  17. Property Assessment of Sponge Cake Added with Egg Replacer

    OpenAIRE

    Yaqiang He; Linlin Wang; Qian Lu

    2015-01-01

    Chicken egg which is always used in sponge cake production is likely to deteriorate during storage or transportation. This weakness prevents the wide use of chicken egg in sponge cake making. In order to solve this problem, egg replacer has been developed. In this study, effect of egg replacer on the property of sponge cake was analyzed. The result indicated egg replacer could improve the yield rate and specific volume of sponge cake. However, high content of egg replacer would negatively imp...

  18. Principles of human joint replacement design and clinical application

    CERN Document Server

    Buechel, Frederick F

    2015-01-01

    This book is written for the users and designers of joint replacements. In its second extended edition it conveys to the reader the knowledge accumulated by the authors during their forty year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter describes the design methodology now required for joint replacement in the USA and EU countries. The remaining chapters provide a history of joint replacement, an evaluation of earlier and current devices and sample case hist...

  19. Principles of Human Joint Replacement Design and Clinical Application

    CERN Document Server

    Buechel, Frederick F

    2012-01-01

    Drs. Buechel, an orthopaedic surgeon, and Pappas, a professor of Mechanical Engineering, are the designers of several successful joint replacement systems. The most well-known of these is the pioneering LCS knee replacement. They have written this book for the users and designers of joint replacements. It is an attempt to convey to the reader the knowledge accumulated by the authors during their thirty five year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter de...

  20. Mitochondrial replacement techniques: egg donation, genealogy and eugenics

    OpenAIRE

    Palacios-Gonz?lez, C?sar

    2016-01-01

    Several objections against the morality of researching or employing mitochondrial replacement techniques have been advanced recently. In this paper, I examine three of these objections and show that they are found wanting. First I examine whether mitochondrial replacement techniques, research and clinical practice, should not be carried out because of possible harms to egg donors. Next I assess whether mitochondrial replacement techniques should be banned because they could affect the study o...

  1. Steam generator replacement: a story of continuous improvement

    International Nuclear Information System (INIS)

    Sills, M.S.; Wilkerson, R.

    2009-01-01

    This paper provides a review of the history of steam generator replacement in the US focusing on the last five years. From the early replacements in the 1980s, there have been major technology improvements resulting in dramatically shorter outages and reduced radiological exposure for workers. Even though the changes for the last five years have been less dramatic, the improvement trend continues. No two steam generator replacement (SGR) projects are the same and there are some major differences including; the access path for the components to containment (is a construction opening in containment required), type of containment, number of steam generators, one piece or two piece replacement, plant type (Westinghouse, CE or B and W) and plant layout. These differences along with other variables such as delays due to plant operations and other activities not related to the steam generator replacement make analysis of performance data difficult. However, trends in outage performance and owner expectations can be identified. How far this trend will go is also discussed. Along with the trend of improved performance, there is also a significant variation in performance. Some of the contributors to this variation are identified. This paper addresses what is required for a successful outage, meeting the increasing expectations and setting new records. The authors will discuss various factors that contribute to the success of a steam generator replacement. These factors include technical issues and, equally important, organizational interface and the role the customer plays. Recommendations are provided for planning a successful steam generator replacement outage. (author)

  2. Solid-State Thyratron Replacement. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Roth, Ian [Diversified Technologies, Inc., Bedford, MA

    2017-12-12

    Under this SBIR, DTI developed a solid-state switch as an alternative to legacy thyratron equipment. Our Phase II objective was to make a solid-state thyratron replacement that would provide equivalent or better performance, much higher reliability (at least a 20 year lifetime, compared to a thyratron’s two-year lifetime) and would sell for ~3x the cost of a thyratron, or less than $40k. We were successful in building a solid-state switch which could reliably function as a thyratron replacement. The unit was designed to directly replace the thyratrons currently being used at SLAC’s Linac Coherent Light Source (LCLS), and was built in a tank that was small enough to fit into the existing thyratron cabinet, providing a true form-fit-function replacement path. We tested the switch at the full operating specifications: 48 kV, 6.3 kA, and 1 µs risetime. We also demonstrated a peak-to-peak pulse jitter of 1.5 ns, which is five times shorter than is typical for thyratrons. This lower jitter would improve the performance of the LCLS beam. The predicted reliability is more than 80 years, which is 40 times greater than a thyratron.

  3. 48 CFR 908.7101-4 - Replacement of motor vehicles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Replacement of motor....7101-4 Replacement of motor vehicles. (a) The replacement of motor vehicles shall be in accordance with... Heads of Contracting Activities may arrange to sell, as exchange sales, used motor vehicles being...

  4. Slab replacement maturity guidelines.

    Science.gov (United States)

    2014-04-01

    This study investigated the use of maturity method to determine early age strength of concrete in slab : replacement application. Specific objectives were (1) to evaluate effects of various factors on the compressive : maturity-strength relationship ...

  5. REPLACEMENT IN RABBIT HERDS: A REVIEW

    Directory of Open Access Journals (Sweden)

    Ibrahim F.M. Marai

    2010-08-01

    Full Text Available Doe rabbit's replacement constitutes the annual renewal rate of new breeders that must be incorporated into the production stock. Criterion for culling non-productive animals differs significantly among fryer production colonies, foundation stocks and a colony with continuous enzootic disease or continuous malnourishment. In commercial rabbit production, good management improves the health and productivity of the entire herd, by reducing the all-time high replacement rates and improving economic viability. In the present article, a comprehensive review of numerous experiences in the rabbit production field of different countries, was presented. Basic recommendations for professional breeders were highlighted, covering critical issues such as the need for continuously upgrading the health status of the colony, the positive effect of   genetic selection and the nutritional conditioning and special treatment of young does being groomed as future replacements.

  6. Strategies for replacement of obsolete equipment - including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2000-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of: commercially available equivalent component; modification of a commercial available component; reverse engineering of the original component; and finally, design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: Missing, misleading or no information on the original component; Acquiring information from the original equipment manufacturer and the plant; Using a sample component for the replacement evaluation and or reverse engineering; and Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  7. Age replacement policy based on imperfect repair with random probability

    International Nuclear Information System (INIS)

    Lim, J.H.; Qu, Jian; Zuo, Ming J.

    2016-01-01

    In most of literatures of age replacement policy, failures before planned replacement age can be either minimally repaired or perfectly repaired based on the types of failures, cost for repairs and so on. In this paper, we propose age replacement policy based on imperfect repair with random probability. The proposed policy incorporates the case that such intermittent failure can be either minimally repaired or perfectly repaired with random probabilities. The mathematical formulas of the expected cost rate per unit time are derived for both the infinite-horizon case and the one-replacement-cycle case. For each case, we show that the optimal replacement age exists and is finite. - Highlights: • We propose a new age replacement policy with random probability of perfect repair. • We develop the expected cost per unit time. • We discuss the optimal age for replacement minimizing the expected cost rate.

  8. Replacement of traditional seawater-soluble pigments by starch and hydrolytic enzymes in polishing antifouling coatings

    DEFF Research Database (Denmark)

    Olsen, Søren Martin; Pedersen, L. T.; Dam-Johansen, Kim

    2010-01-01

    The use of starch and hydrolytic enzymes as replacement for traditional polishing pigments (e.g., Cu2O and ZnO) in antifouling coatings has been investigated. The enzymes facilitate a slow conversion of water-insoluble starch into water-soluble glucose, and dissolution of glucose causes the devel......The use of starch and hydrolytic enzymes as replacement for traditional polishing pigments (e.g., Cu2O and ZnO) in antifouling coatings has been investigated. The enzymes facilitate a slow conversion of water-insoluble starch into water-soluble glucose, and dissolution of glucose causes...... the development of a leached (porous) layer in the wetted, outermost part of the coating. Subsequent water-binder interaction at the pore walls gives rise to polishing, in a manner similar to that of conventional antifouling coatings. Different starch types have been evaluated and classified as potential coating...

  9. Smart variations: Functional substructures for part compatibility

    KAUST Repository

    Zheng, Youyi

    2013-05-01

    As collections of 3D models continue to grow, reusing model parts allows generation of novel model variations. Naïvely swapping parts across models, however, leads to implausible results, especially when mixing parts across different model families. Hence, the user has to manually ensure that the final model remains functionally valid. We claim that certain symmetric functional arrangements (sFarr-s), which are special arrangements among symmetrically related substructures, bear close relation to object functions. Hence, we propose a purely geometric approach based on such substructures to match, replace, and position triplets of parts to create non-trivial, yet functionally plausible, model variations. We demonstrate that starting even from a small set of models such a simple geometric approach can produce a diverse set of non-trivial and plausible model variations. © 2013 The Author(s) Computer Graphics Forum © 2013 The Eurographics Association and Blackwell Publishing Ltd.

  10. An abstract machine model of dynamic module replacement

    OpenAIRE

    Walton, Chris; Kırlı, Dilsun; Gilmore, Stephen

    2000-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement for the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection. We show how the operation of module replacement could be applied to other garbage-collected languages such as Java.

  11. Nonparametric adaptive age replacement with a one-cycle criterion

    International Nuclear Information System (INIS)

    Coolen-Schrijner, P.; Coolen, F.P.A.

    2007-01-01

    Age replacement of technical units has received much attention in the reliability literature over the last four decades. Mostly, the failure time distribution for the units is assumed to be known, and minimal costs per unit of time is used as optimality criterion, where renewal reward theory simplifies the mathematics involved but requires the assumption that the same process and replacement strategy continues over a very large ('infinite') period of time. Recently, there has been increasing attention to adaptive strategies for age replacement, taking into account the information from the process. Although renewal reward theory can still be used to provide an intuitively and mathematically attractive optimality criterion, it is more logical to use minimal costs per unit of time over a single cycle as optimality criterion for adaptive age replacement. In this paper, we first show that in the classical age replacement setting, with known failure time distribution with increasing hazard rate, the one-cycle criterion leads to earlier replacement than the renewal reward criterion. Thereafter, we present adaptive age replacement with a one-cycle criterion within the nonparametric predictive inferential framework. We study the performance of this approach via simulations, which are also used for comparisons with the use of the renewal reward criterion within the same statistical framework

  12. Replacement Value of fermented millet ( Pennisetum americanum ...

    African Journals Online (AJOL)

    The replacement value of fermented millet for maize in the diets of Clarias gariepinus fingerlings reared in a recirculation system was determined. Five isonitrogenous diets were formulated to contain graded levels of fermented millet meal replacing 0, 20, 40, 60 and 80% of maize and fed to triplicate groups of fingerlings ...

  13. 41 CFR 51-6.14 - Replacement services.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Replacement services. 51-6.14 Section 51-6.14 Public Contracts and Property Management Other Provisions Relating to Public... § 51-6.14 Replacement services. If a service is on the Procurement List to meet the needs of a...

  14. REPLACEMENT CONTROL OF INNOVATION MANAGERS: ORGANIZATIONAL AND ECONOMIC ASPECTS

    Directory of Open Access Journals (Sweden)

    E. V. Gurina

    2011-01-01

    Full Text Available The paper substantiates phases of specialists’ replacement ensuring innovation development of the national economy in Belarus, i.e. managers of innovation activity. Realization of replacement phases is presented within the system consisting of four blocks – objective, managing, controllable and providing. Analysis results of the current state of the innovation activity managers replacement system reveal main problems in interaction of its basic agents. The paper considers solution of specified problems in the context of formation of organizational and economic approaches to managing the innovation activity managers replacement system which presupposes modernization of organizational interrelations between state- run public authorities in the managing block and micro-incentive structures in the controllable block as well as the usage of the process approach in every phase of the replacement process. 

  15. Technical development and its application on steam generator replacement

    International Nuclear Information System (INIS)

    Morita, Sadahiko; Hanzawa, Katsumi; Sato, Hajime; Kannoto, Yasuo.

    1995-01-01

    Twenty-two PWR nuclear power plants are now under commercial operation in Japan. Eight of these plants are scheduled to have their steam generators replaced by up-graded units as a social responsibility for improved reliability, economy and easier maintenance. To carry out steam generator replacement, main coolant pipe cutting and restoration techniques, remote controlled welding machines and other remote controlled equipment, templating techniques with which the new steam generator primary nozzles will fit the existing primary pipes correctly were developed. An adequate training program was carried out to establish these techniques and they were then applied in replacement work on site. The steam generators of the three plants were replaced completely in 1994. These newly developed techniques are to be applied in upcoming plants and replaced plants will be much reliable. (author)

  16. Reoperative aortic root replacement: Outcome in a contemporary series.

    Science.gov (United States)

    Esaki, Jiro; Leshnower, Bradley G; Binongo, Jose N; Lasanajak, Yi; McPherson, LaRonica; Thourani, Vinod H; Chen, Edward P

    2017-09-01

    Reoperative aortic root replacement is a challenging procedure associated with significant mortality and morbidity. The purpose of this study was to investigate the outcomes of reoperative aortic root replacement when performed in a number of complex clinical settings and to identify risk factors for operative mortality and long-term survival. From 2006 to 2015, 280 consecutive patients at an academic center underwent reoperative aortic root replacement after a variety of previous aortic or cardiac operations. Logistic regression and extended Cox proportional hazards regression analyses were used to determine risk factors for operative mortality and long-term survival, respectively. The mean age of patients was 52.5 ± 14.1 years. Prior operations included proximal aortic replacement in 113 patients, valve surgery in 162 patients, and coronary artery bypass grafting in 46 patients. Concomitant procedures included arch replacement in 135 patients, coronary artery bypass grafting in 68 patients, and mitral valve repair/replacement in 18 patients. Operative mortality was 14.3%. Five-year survival was 74.0%. Univariable analysis did not find previous root replacement, prior proximal aortic surgery, and concomitant arch replacement to be risk factors for operative mortality. In the multivariable analysis, chronic lung disease, prior myocardial infarction, and concomitant mitral valve surgery were risk factors for operative mortality. Age, peripheral artery disease, emergency, and concomitant mitral valve surgery were risk factors for mortality in the late phase. Reoperative aortic root replacement represents complex procedures carrying significant morbidity and mortality. Chronic lung disease, prior myocardial infarction, and concomitant mitral valve surgery were risk factors for operative mortality. Age, peripheral artery disease, emergency, and concomitant mitral valve surgery were risk factors for long-term mortality. Copyright © 2017 The American Association for

  17. Strategies for replacement of obsolete equipment, including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of, (1) commercially available equivalent component, (2) modification of a commercial available component, (3) reverse engineering of the original component and finally (4) design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: 1) Missing, misleading or no information on the original component. 2) Acquiring information from the original equipment manufacturer and the plant. 3) Using a sample component for the replacement evaluation and or reverse engineering. 4) Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  18. BWR control blade replacement strategies

    Energy Technology Data Exchange (ETDEWEB)

    Kennard, M W [Stoller Nuclear Fuel, NAC International, Pleasantville, NY (United States); Harbottle, J E [Stoller Nuclear Fuel, NAC International, Thornbury, Bristol (United Kingdom)

    2000-02-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B{sub 4}C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  19. BWR control blade replacement strategies

    International Nuclear Information System (INIS)

    Kennard, M.W.; Harbottle, J.E.

    2000-01-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B 4 C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  20. The caudal septum replacement graft.

    Science.gov (United States)

    Foda, Hossam M T

    2008-01-01

    To describe a technique for reconstructing the lost tip support in cases involving caudal septal and premaxillary deficiencies. The study included 120 patients with aesthetic and functional nasal problems resulting from the loss of caudal septal and premaxillary support. An external rhinoplasty approach was performed to reconstruct the lost support using a cartilaginous caudal septum replacement graft and premaxillary augmentation with Mersilene mesh. The majority of cases (75%) involved revisions in patients who had previously undergone 1 or more nasal surgical procedures. A caudal septum replacement graft was combined with premaxillary augmentation in 93 patients (77.5%). The mean follow-up period was 3 years (range, 1-12 years). The technique succeeded in correcting the external nasal deformities in all patients and resulted in a significant improvement in breathing in 74 patients (86%) with preoperative nasal obstruction. There were no cases of infection, displacement, or extrusion. The caudal septum replacement graft proved to be very effective in restoring the lost tip support in patients with caudal septal deficiency. Combining the graft with premaxillary augmentation using Mersilene mesh helped increase support and stability over long-term follow-up.

  1. Results of Austin Moore replacement.

    Directory of Open Access Journals (Sweden)

    Jadhav A

    1996-04-01

    Full Text Available Forty cases of Austin Moore Replacement done for transcervical fractures of the femur in patients were reviewed after a period of 12 to 48 months postoperatively (mean 26 mth. 30 cases (75% had mild to severe pain of non-infective origin, starting as early as 6 months postoperatively. This was irrespective of the make, size or position (varus/valgus of the prosthesis. Though the Aufranc and Sweet clinical scoring was satisfactory in 65% cases, radiological evidence of complications like sinking, protrusion, etc. were seen in majority of the cases. Calcar resorption was seen in 34 cases (85% as early as 4 months postoperatively. Results of THR and bipolar replacement done for transcervical fractures in recent literature show 85% pain-free cases at 5 years. We feel that Austin Moore Replacement should be reserved for patients more than 65 years of age and those who are less active or debilitated because of other factors, because of increased acetabular wear with time in the younger individual. This is corroborated by unsatisfactory results in patients less than 65 years of age (p < 0.05.

  2. Replacement rod

    International Nuclear Information System (INIS)

    Hatfield, S.C.

    1989-01-01

    This patent describes in an elongated replacement rod for use with fuel assemblies of the type having two end fittings connected by guide tubes with a plurality of rod and guide tube cell defining spacer grids containing rod support features and mixing vanes. The grids secured to the guide tubes in register between the end fittings at spaced intervals. The fuel rod comprising: an asymmetrically beveled tip; a shank portion having a straight centerline; and a permanently diverging portion between the tip and the shank portion

  3. Infant Ependymoma in a 10-Year AIEOP (Associazione Italiana Ematologia Oncologia Pediatrica) Experience With Omitted or Deferred Radiotherapy

    International Nuclear Information System (INIS)

    Massimino, Maura; Gandola, Lorenza; Barra, Salvina; Giangaspero, Felice; Casali, Cecilia; Potepan, Paolo; Di Rocco, Concezio; Nozza, Paolo; Collini, Paola; Viscardi, Elisabetta; Bertin, Daniele; Biassoni, Veronica; Cama, Armando; Milanaccio, Claudia; Modena, Piergiorgio; Balter, Rita; Tamburrini, Giampiero; Peretta, Paola; Mascarin, Maurizio; Scarzello, Giovanni

    2011-01-01

    Purpose: The protocols of the 1990s omitted or delayed irradiation, using upfront chemotherapy to spare the youngest children with ependymoma the sequelae of radiotherapy (RT). We treated 41 children under the age of 3 years with intracranial ependymoma between 1994 and 2003. Patients and Methods: After surgery, chemotherapy was given as follows: regimen I with four blocks of vincristine, high-dose methotrexate 5 g/m 2 , and cyclophosphamide 1.5 g/m 2 alternating with cisplatin 90 mg/m 2 plus VP16 450 mg/m 2 for 14 months; subsequently, regimen II was used: VEC (VCR, VP16 300 mg/m 2 , and cyclophosphamide 3 g/m 2 ) for 6 months. Radiotherapy was planned for residual tumor after the completion of chemotherapy or for progression. Results: We treated 23 boys and 18 girls who were a median 22 months old; 14 were given regimen I, 27 were given regimen II; 22 underwent complete resection, 19 had residual tumor. Ependymoma was Grade 2 in 25 patients and Grade 3 in 16; tumors were infratentorial in 37 patients and supratentorial in 4. One child had intracranial metastases; 29 had progressed locally after a median 9 months. Event-free survival was 26% at 3 and 5 years and 23% at 8 years. One child died of sepsis, and another developed a glioblastoma 72 months after RT. Progression-free survival was 27% at 3, 5, and 8 years, and overall survival was 48%, 37%, and 28% at 3, 5, and 8 years, respectively. Of the 13 survivors, 6 never received RT; their intellectual outcome did not differ significantly in those children than in those without RT. Conclusions: Our results confirm poor rates of event-free survival and overall survival for up-front chemotherapy in infant ependymoma. No better neurocognitive outcome was demonstrated in the few survivors who never received RT.

  4. Structure, attachment, replacement and growth of teeth in bluefish, Pomatomus saltatrix (Linnaeus, 1776), a teleost with deeply socketed teeth.

    Science.gov (United States)

    Bemis, William E; Giuliano, Anne; McGuire, Betty

    2005-01-01

    Tooth replacement poses many questions about development, pattern formation, tooth attachment mechanisms, functional morphology and the evolution of vertebrate dentitions. Although most vertebrate species have polyphyodont dentitions, detailed knowledge of tooth structure and replacement is poor for most groups, particularly actinopterygians. We examined the oral dentition of the bluefish, Pomatomus saltatrix, a pelagic and coastal marine predator, using a sample of 50 individuals. The oral teeth are located on the dentary and premaxillary bones, and we scored each tooth locus in the dentary and premaxillary bones using a four-part functional classification: absent (A), incoming (I), functional (F=fully ankylosed) or eroding (E). The homodont oral teeth of Pomatomus are sharp, deeply socketed and firmly ankylosed to the bone of attachment. Replacement is intraosseus and occurs in alternate tooth loci with long waves of replacement passing from rear to front. The much higher percentage of functional as opposed to eroding teeth suggests that replacement rates are low but that individual teeth are quickly lost once erosion begins. Tooth number increases ontogenetically, ranging from 15-31 dentary teeth and 15-39 premaxillary teeth in the sample studied. Teeth increase in size with every replacement cycle. Remodeling of the attachment bone occurs continuously to accommodate growth. New tooth germs originate from a discontinuous dental lamina and migrate from the lingual (dentary) or labial (premaxillary) epithelium through pores in the bone of attachment into the resorption spaces beneath the existing teeth. Pomatomus shares unique aspects of tooth replacement with barracudas and other scombroids and this supports the interpretation that Pomatomus is more closely related to scombroids than to carangoids.

  5. Workplace Bullying in Healthcare: Part 1.

    Science.gov (United States)

    Lamberth, Becky

    2015-01-01

    Bullying is a repetitive and a busive behavior in which the victim suffers from abuse, humiliation, or intimidation to such an extent that it interferes with job performance. Victims of bullying have three possible legal solutions: harassment, hostile work environment, and intentional/negligent infliction of emotional distress. However, the elements necessary to fulfill the legal definitions are subjective and difficult at best to satisfy. Hospitals are hesitant to terminate any employee, which would result in open staff positions that are difficult to fill. Replacing staff with specific skills, costly. This make recruitmen cost a significant factor in retaining staff members who demonstrate poor behavior. Part 1 will focus on terminology and concerns related to bullying. Part 2 will discuss the legal protection afforded the bully and possible organizational solutions. Part 3 will address managers who have been accused of bullying by disgruntled employees and what to do about it.

  6. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  7. Replacement of the JRR-3 computer system

    Energy Technology Data Exchange (ETDEWEB)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2000-10-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  8. How to replace a reactor pressure vessel

    International Nuclear Information System (INIS)

    Huber, R.

    1996-01-01

    A potential life extending procedure for a nuclear reactor after, say, 40 years of service life, might in some circumstances be the replacement of the reactor pressure vessel. Neutron induced degradation of the vessel might make replacement by one of a different material composition desirable, for example. Although the replacement of heavy components, such as steam generators, has been possible for many years, the pressure vessel presents a much more demanding task if only because it is highly irradiated. Some preliminary feasibility studies by Siemens are reported for the two removal strategies that might be considered. These are removal of the entire pressure vessel in one piece and dismantling it into sections. (UK)

  9. Replacement of the JRR-3 computer system

    International Nuclear Information System (INIS)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu

    2000-01-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  10. Mechanical Aortic Valve Replacement in Octogenarian

    Directory of Open Access Journals (Sweden)

    Irfan Tasoglu

    2013-10-01

    Full Text Available Aim: This study analyzes the long-term outcomes of mechanical aortic valve replacement in octogenarian patients. Material and Method: A retrospective review was performed on 23 octogenarian patients who underwent mechanical aortic valve replacement. Hospital mortality, postoperative intensive care unit stay, hospital stay and long-term results was examined. Estimates of the cumulative event mortality rate were calculated by the Kaplan-Meier method. Results: The mean age of all patients was 82.9±2.3 years and most were men (65.22%. The median ejection fraction was 45%. 73.91% of patients were in New York Heart Association class III-IV. Thirteen patients (56.52% in this study underwent combined procedure, the remaining 10 (43.48% patients underwent isolated aortic valve replacement. The most common valve size was 23 mm. The mean intensive care unit stay was 1.76±1.14 days. The mean hospital stay was 9.33±5.06 days. No complications were observed in 56.52% patients during their hospital stay. The overall hospital mortality was 8.7%. Follow-up was completed for all 23 patients. Median follow-up time was 33 months (1-108 months. Actuarial survival among discharged from hospital was 59% at 5 years. Discussion: Mechanical aortic valve replacement is a safe procedure in octogenarian patients and can be performed safely even in combined procedure.

  11. Steam generator replacement at Doel 3 NPP (Belgium)

    International Nuclear Information System (INIS)

    Danhier, B.

    1993-01-01

    The reasons are presented that led to the conclusion that the most cost-effective strategy for the Doel 3 unit was the immediate replacement of the SG. Discussed are the advantages and drawbacks of the replacement techniques, the so-called 2, 3 and 4 cuts methods. The advantages are emphasized of intensive use of computer aided engineering in this kind of backfitting. The methodology applied to combine a power uprating of 10% over the nominal power with the steam generator replacement is presented. (author) 1 fig

  12. Optimal Overhaul-Replacement Policies for Repairable Machine Sold with Warranty

    Directory of Open Access Journals (Sweden)

    Kusmaningrum Soemadi

    2014-12-01

    Full Text Available This research deals with an overhaul-replacement policy for a repairable machine sold with Free Replacement Warranty (FRW. The machine will be used for a finite horizon, T (T <, and evaluated at a fixed interval, s (s< T. At each evaluation point, the buyer considers three alternative decisions i.e. Keep the machine, Overhaul it, or Replace it with a new identical one. An overhaul can reduce the machine age virtually, but not to a point that the machine is as good as new. If the machine fails during the warranty period, it is rectified at no cost to the buyer. Any failure occurring before and after the expiry of the warranty is restored by minimal repair. An overhaul-replacement policy is formulated for such machines by using dynamic programming approach to obtain the buyer’s optimal policy. The results show that a significant rejuvenation effect due to overhaul may extend the length of machine life cycle and delay the replacement decision. In contrast, the warranty stimulates early machine replacement and by then increases the replacement frequencies for a certain range of replacement cost. This demonstrates that to minimize the total ownership cost over T the buyer needs to consider the minimal repair cost reduction due to rejuvenation effect of overhaul as well as the warranty benefit due to replacement. Numerical examples are presented for both illustrating the optimal policy and describing the behavior of the optimal solution.

  13. [Update in continuous renal replacement techniques].

    Science.gov (United States)

    Romero-García, M; de la Cueva-Ariza, L; Delgado-Hito, P

    2013-01-01

    Acute renal failure affects 25% of patients hospitalized in intensive care units. Despite technological advances, the mortality of these patients is still high due to its associated complications. Continuous renal replacement techniques are one of the treatments for acute renal failure because they make it possible to treat the complications and decrease mortality. The nurse's knowledge and skills regarding these techniques will be decisive for the success of the therapy. Consequently, the nurse's experience and training are key components. The objective of this article is to update the knowledge on continuous renal replacement techniques. Keeping this in mind, a review has been made of the physical and chemical principles such as diffusion and convection, among others. A description of the different continuous renal replacement techniques, a presentation of the main vascular access, and a description of the nursing cares and complications related to techniques used have also been provided. Copyright © 2012 Elsevier España, S.L. y SEEIUC. All rights reserved.

  14. Replacement of Mushroom Cage Gastrostomy Tube Using a Modified Technique to Allow Percutaneous Replacement with an Endoscopic Tube in Patients with Amyotrophic Lateral Sclerosis

    International Nuclear Information System (INIS)

    Ammar, Thoraya; Rio, Alan; Ampong, Mary Ann; Sidhu, Paul S.

    2010-01-01

    Radiologic inserted gastrostomy (RIG) is the preferred method in our institution for enteral feeding in amyotrophic lateral sclerosis (ALS). Skin-level primary-placed mushroom cage gastrostomy tubes become tight with weight gain. We describe a minimally invasive radiologic technique for replacing mushroom gastrostomy tubes with endoscopic mushroom cage tubes in ALS. All patients with ALS who underwent replacement of a RIG tube were included. Patients were selected for a modified replacement when the tube length of the primary placed RIG tube was insufficient to allow like-for-like replacement. Replacement was performed under local anesthetic and fluoroscopic guidance according to a preset technique, with modification of an endoscopic mushroom cage gastrostomy tube to allow percutaneous placement. Assessment of the success, safety, and durability of the modified technique was undertaken. Over a 60-month period, 104 primary placement mushroom cage tubes in ALS were performed. A total of 20 (19.2%) of 104 patients had a replacement tube positioned, 10 (9.6%) of 104 with the modified technique (male n = 4, female n = 6, mean age 65.5 years, range 48-85 years). All tubes were successfully replaced using this modified technique, with two minor complications (superficial wound infection and minor hemorrhage). The mean length of time of tube durability was 158.5 days (range 6-471 days), with all but one patient dying with a functional tube in place. We have devised a modification to allow percutaneous replacement of mushroom cage gastrostomy feeding tubes with minimal compromise to ALS patients. This technique allows tube replacement under local anesthetic, without the need for sedation, an important consideration in ALS.

  15. Replacement divider plate performance under LOCA loading

    International Nuclear Information System (INIS)

    Huynk, H.M.; MClellan, G.H.; Schneider, W.G.

    1997-01-01

    A primary divider plate in a nuclear steam generator is required to perform its partitioning function with a minimum of cross leakage, without degradation in operating performance and without loss of structural integrity resulting from normal and accident loading. The design of the replacement divider plate for normal operating conditions is discussed in some detail in reference 1 and 2. This paper describes the structural response of the replacement divider plate to the severe loading resulting from a burst primary pipe. The loads for which the divider plate structural performance must be evaluated are mild to severe differential pressure transients resulting from several postulated sizes and types of pipe break scenarios. In the unlikely event of a severe Loss of Coolant Accident (LOCA) the divider plate or parts thereof must not exit the steam generator nor completely block the outlet nozzle. For the milder LOCA loads, the integrity of the divider plate and seat bars must be maintained. Analysis for the milder LOCA loads was carried out employing a conservative approach which ignores the actual interaction between the structure and the primary fluid. For these load cases it was shown that the divider plate does not become disengaged from the seat bars. For the more severe pipe breaks, the thermal-hydraulic analysis was coupled iteratively with the structural analysis, thereby taking into account divider plate deformation, in order to obtain a better prediction of the behaviour of the divider plate. In this manner substantial reduction in divider plate response to the more severe LOCA loading was achieved. It has been shown that, for the case of a postulated large LOCA (100% reactor inlet header), the disengagement of the divider plate from the seat bars resulted in an opening smaller than 1% of the divider plate area. (author)

  16. Affective imagery and acceptance of replacing nuclear power plants.

    Science.gov (United States)

    Keller, Carmen; Visschers, Vivianne; Siegrist, Michael

    2012-03-01

    This study examined the relationship between the content of spontaneous associations with nuclear power plants and the acceptance of using new-generation nuclear power plants to replace old ones. The study also considered gender as a variable. A representative sample of the German- and French-speaking population of Switzerland (N= 1,221) was used. Log-linear models revealed significant two-way interactions between the association content and acceptance, association content and gender, and gender and acceptance. Correspondence analysis revealed that participants who were opposed to nuclear power plants mainly associated nuclear power plants with risk, negative feelings, accidents, radioactivity, waste disposal, military use, and negative consequences for health and environment; whereas participants favoring nuclear power plants mainly associated them with energy, appearance descriptions of nuclear power plants, and necessity. Thus, individuals opposing nuclear power plants had both more concrete and more diverse associations with them than people who were in favor of nuclear power plants. In addition, participants who were undecided often mentioned similar associations to those participants who were in favor. Males more often expressed associations with energy, waste disposal, and negative health effects. Females more often made associations with appearance descriptions, negative feelings, and negative environmental effects. The results further suggest that acceptance of replacing nuclear power plants was higher in the German-speaking part of the country, where all of the Swiss nuclear power plants are physically located. Practical implications for risk communication are discussed. © 2011 Society for Risk Analysis.

  17. Dead pixel replacement in LWIR microgrid polarimeters.

    Science.gov (United States)

    Ratliff, Bradley M; Tyo, J Scott; Boger, James K; Black, Wiley T; Bowers, David L; Fetrow, Matthew P

    2007-06-11

    LWIR imaging arrays are often affected by nonresponsive pixels, or "dead pixels." These dead pixels can severely degrade the quality of imagery and often have to be replaced before subsequent image processing and display of the imagery data. For LWIR arrays that are integrated with arrays of micropolarizers, the problem of dead pixels is amplified. Conventional dead pixel replacement (DPR) strategies cannot be employed since neighboring pixels are of different polarizations. In this paper we present two DPR schemes. The first is a modified nearest-neighbor replacement method. The second is a method based on redundancy in the polarization measurements.We find that the redundancy-based DPR scheme provides an order-of-magnitude better performance for typical LWIR polarimetric data.

  18. Three Steam Generator Replacement Projects in 1995

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S. A. joined their experience and efforts in the field of steam generator replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 1. Further projects will follow in 1996, i. e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  19. Testosterone Replacement, Muscle Strength, and Physical Function

    Directory of Open Access Journals (Sweden)

    You-Seon Nam

    2018-05-01

    Full Text Available Muscle strength and physical function decrease in older men, as do testosterone levels. Nonetheless, the effects of testosterone replacement therapy on muscle strength and physical function remain inconclusive and equivocal. We conducted a rapid systematic review, the results of which showed that testosterone replacement does not affect muscle strength (measured by hand grip strength and leg muscle strength, although it may increase physical function (measured by the 6-minute walk test, Physical Activity Scale for the Elderly score, and other physical performance tests. However, most of the studies were conducted in the United States or Europe and did not include participants from Asian or other ethnic backgrounds; therefore, further studies are needed to evaluate the effects of testosterone replacement in a broader population.

  20. Differences in the stress distribution in the distal femur between patellofemoral joint replacement and total knee replacement: a finite element study

    NARCIS (Netherlands)

    van Jonbergen, H.P.; Innocenti, B.; Gervasi, G.L.; Labey, L.; Verdonschot, N.J.

    2012-01-01

    BACKGROUND: Patellofemoral joint replacement is a successful treatment option for isolated patellofemoral osteoarthritis. However, results of later conversion to total knee replacement may be compromised by periprosthetic bone loss. Previous clinical studies have demonstrated a decrease in distal

  1. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  2. Improving performances of the knee replacement surgery process by applying DMAIC principles.

    Science.gov (United States)

    Improta, Giovanni; Balato, Giovanni; Romano, Maria; Ponsiglione, Alfonso Maria; Raiola, Eliana; Russo, Mario Alessandro; Cuccaro, Patrizia; Santillo, Liberatina Carmela; Cesarelli, Mario

    2017-12-01

    The work is a part of a project about the application of the Lean Six Sigma to improve health care processes. A previously published work regarding the hip replacement surgery has shown promising results. Here, we propose an application of the DMAIC (Define, Measure, Analyse, Improve, and Control) cycle to improve quality and reduce costs related to the prosthetic knee replacement surgery by decreasing patients' length of hospital stay (LOS) METHODS: The DMAIC cycle has been adopted to decrease the patients' LOS. The University Hospital "Federico II" of Naples, one of the most important university hospitals in Southern Italy, participated in this study. Data on 148 patients who underwent prosthetic knee replacement between 2010 and 2013 were used. Process mapping, statistical measures, brainstorming activities, and comparative analysis were performed to identify factors influencing LOS and improvement strategies. The study allowed the identification of variables influencing the prolongation of the LOS and the implementation of corrective actions to improve the process of care. The adopted actions reduced the LOS by 42%, from a mean value of 14.2 to 8.3 days (standard deviation also decreased from 5.2 to 2.3 days). The DMAIC approach has proven to be a helpful strategy ensuring a significant decreasing of the LOS. Furthermore, through its implementation, a significant reduction of the average costs of hospital stay can be achieved. Such a versatile approach could be applied to improve a wide range of health care processes. © 2017 John Wiley & Sons, Ltd.

  3. Heart valve replacement with the Sorin tilting-disc prosthesis. A 10-year experience.

    Science.gov (United States)

    Milano, A; Bortolotti, U; Mazzucco, A; Mossuto, E; Testolin, L; Thiene, G; Gallucci, V

    1992-02-01

    From 1978 to 1988, 697 patients with a mean age of 48 +/- 11 years (range 5 to 75 years) received a Sorin tilting-disc prosthesis; 358 had had aortic valve replacement, 247 mitral valve replacement, and 92 mitral and aortic valve replacement. Operative mortality rates were 7.8%, 11.3%, and 10.8%, respectively, in the three groups. Cumulative duration of follow-up is 1650 patient-years for aortic valve replacement (maximum follow-up 11.4 years), 963 patient-years for mitral valve replacement (maximum follow-up 9.9 years) and 328 patient-years for mitral and aortic valve replacement (maximum follow-up 9.4 years). Actuarial survival at 9 years is 72% +/- 4% after mitral valve replacement, 70% +/- 3% after aortic valve replacement, and 50% +/- 12% after mitral and aortic valve replacement, and actuarial freedom from valve-related deaths is 97% +/- 2% after mitral valve replacement, 92% +/- 2% after aortic valve replacement, and 62% +/- 15% after mitral and aortic valve replacement. Thromboembolic events occurred in 21 patients with aortic valve replacement (1.3% +/- 0.2%/pt-yr), in 12 with mitral valve replacement (1.2% +/- 0.3% pt-yr), and in seven with mitral and aortic valve replacement (2.1% +/- 0.8%), with one case of prosthetic thrombosis in each group; actuarial freedom from thromboembolism at 9 years is 92% +/- 3% after mitral valve replacement, 91% +/- 3% after aortic valve replacement, and 74% +/- 16% after mitral and aortic valve replacement. Anticoagulant-related hemorrhage was observed in 15 patients after aortic valve replacement (0.9% +/- 0.2%/pt-yr), in 9 after mitral valve replacement (0.9% +/- 0.3%/pt-yr), and in 6 with mitral and aortic valve replacement (0.9% +/- 0.5%/pt-yr); actuarial freedom from this complication at 9 years is 94% +/- 2% after aortic valve replacement, 91% +/- 4% after mitral valve replacement, and 68% +/- 16% after mitral and aortic valve replacement. Actuarial freedom from reoperation at 9 years is 97% +/- 2% after mitral and

  4. 49 CFR 224.109 - Inspection, repair, and replacement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Inspection, repair, and replacement. 224.109 Section 224.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD..., Inspection, and Maintenance of Retroreflective Material § 224.109 Inspection, repair, and replacement. (a...

  5. Decommissioning and equipment replacement of nuclear power plants under uncertainty

    International Nuclear Information System (INIS)

    Takashima, Ryuta; Naito, Yuta; Kimura, Hiroshi; Madarame, Haruki

    2007-01-01

    This study examines the optimal timing for the decommissioning and equipment replacement of nuclear power plants. We consider that the firm has two options of decommissioning and equipment replacement, and determines to exercise these options under electricity price uncertainty. This problem is formulated as two optimal stopping problems. The solution of this model provides the value of the nuclear power plant and the threshold values for decommissioning and replacement. The dependence of decommissioning and replacement strategies on uncertainty and each cost is shown. In order to investigate the probability of events for decommissioning and replacement, Monte Carlo calculations are performed. We also show the probability distribution and the conditional expected time for each event. (author)

  6. Paired replacement fuel assemblies for BWR-type reactor

    International Nuclear Information System (INIS)

    Oguchi, Kazushige.

    1997-01-01

    There are disposed a large-diameter water rod constituting a non-boiling region at a central portion and paired replacement fuel assemblies for two streams having the same average enrichment degree and different amount of burnable poisons. The paired replacement fuel assemblies comprise a first fuel assembly having a less amount of burnable poisons and a second fuel assembly having a larger amount of burnable poisons. A number of burnable poison-containing fuel rods in adjacent with the large diameter water rod is increased in the second fuel assembly than the first fuel assembly. Then, the poison of the paired replacement fuel assemblies for the BWR type reactor can be annihilated simultaneously at the final stage of the cycle. Accordingly, fuels for a BWR type reactor excellent in economical property and safety and facilitating the design of the replacement reactor core can be obtained. (N.H.)

  7. Semantic Factors Predict the Rate of Lexical Replacement of Content Words

    OpenAIRE

    Vejdemo, Susanne; H?rberg, Thomas

    2016-01-01

    The rate of lexical replacement estimates the diachronic stability of word forms on the basis of how frequently a proto-language word is replaced or retained in its daughter languages. Lexical replacement rate has been shown to be highly related to word class and word frequency. In this paper, we argue that content words and function words behave differently with respect to lexical replacement rate, and we show that semantic factors predict the lexical replacement rate of content words. For t...

  8. Method and refrigerants for replacing existing refrigerants in centrifugal compressors

    International Nuclear Information System (INIS)

    Kopko, W.L.

    1991-01-01

    This patent describes a method for replacing an existing refrigerant in a centrifugal compressor. It comprises selecting a desired impeller Mach number for the centrifugal compressor; selecting a base refrigerant constituent; combining at least one additive refrigerant constituent with the base refrigerant constituent to form a replacement refrigerant having at least one physical or chemical property different from the existing refrigerant and substantially providing the desired impeller Mach number in the centrifugal compressor; and replacing the existing refrigerant with the replacement refrigerant

  9. [SECOT consensus on painful knee replacement].

    Science.gov (United States)

    Vaquero, J; Macule, F; Bello, S; Chana, F; Forriol, F

    2013-01-01

    The opinions of 21 experts in knee surgery were evaluated in this study, using a DELPHI questionnaire method in two successive rounds, on 64 controversial scenarios that covered both the diagnosis and possible treatment of painful knee replacements. The level of consensus was significantly unanimous in 42 items and of the design in 5, with no agreement in 17 of the questions presented. light of the published scientific evidence, the surgeons who took part showed to have a notable level of information on the most effective diagnostic tests, although, it should be pointed out that there was a lack of confidence in the possibility of ruling out an infection when the erythrocyte sedimentation rate and the C-reactive protein were within normal values, which have been demonstrated in the literature to have a high negative predictive value As regards the treatments to employ in the different situations, the responses of the expert panel were mainly in agreement with the data in the literature. The conclusions of this consensus may help other surgeons when they are faced with a painful knee prosthesis. Copyright © 2013 SECOT. Published by Elsevier Espana. All rights reserved.

  10. Clinical study on postoperative steroid hormon replacement for preclinical Cushing's syndrome

    International Nuclear Information System (INIS)

    Furuta, Nozomu; Koide, Haruhisa; Sasaki, Hiroshi; Miki, Jun; Kimura, Takahiro; Egawa, Shin

    2009-01-01

    Diagnostic criteria for preclinical Cushing's syndrome (PCS) were reported in 1996. However, requirement of postoperative steroid hormone replacement is still controversial issue. In this study, we observed recent surgical cases retrospectively and evaluate the use of postoperative steroid hormone replacement. Eighteen patients with PCS underwent surgery from 1997 to 2007 in Jikei University Hospital. Thirteen of them received postoperative steroid hormone replacement. We investigated preoperative hormone activity by 131 I-adosterol scintigraphy and suppression of adrenocorticotropic hormone (ACTH) and evaluated the requirement of postoperative steroid hormone replacement. Preoperative serum cortisol was normal range in all patients. Serum ACTH was suppressed in 10 of them (56%). In 131 I-adosterol scintigraphy, accumulation in ipsilateral side was observed in all patients. Accumulation in contralateral side was observed in 13 patients whose serum ACTH had tendency to be suppressed. Mean period of steroid hormone replacement was 19.8 weeks. Patients with lower preoperative ACTH tended to require longer period until withdrawal of steroid hormone replacement. In addition, patients received steroid hormone replacement with higher starting dose significantly required longer period. Three of them had complications during tapering of steroid hormone. Postoperative adrenal insufficiency is important issue as postoperative management of PCS patients whose function of contralateral adrenal or pituitary gland is suppressed. 131 I-adosterol scintigraphy and preoperative serum ACTH were important factors to evaluate the requirement of postoperative steroid hormone replacement. Especially, patients with low preoperative serum ACTH tended to require long duration of postoperative steroid hormone replacement. On the other hand, patients with accumulation of contralateral side in 131 I-adosterol scintigraphy and without suppression of serum ACTH may not require steroid hormone

  11. Replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory

    International Nuclear Information System (INIS)

    1995-05-01

    The DOE-Idaho Operations Office (DOE-ID) has prepared an environmental assessment (EA) on the replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory at the Idaho National Engineering Laboratory (INEL). The purpose of this project is to replace the existing Health Physics Instrumentation Laboratory (HPIL) with a new facility to provide a safe environment for maintaining and calibrating radiation detection instruments used at the Idaho National Engineering Laboratory. The existing HPIL facility provides portable health physics monitoring instrumentation and direct reading dosimetry procurement, maintenance and calibration of radiation detection instruments, and research and development support-services to the INEL and others. However, the existing facility was not originally designed for laboratory activities and does not provide an adequate, safe environment for calibration activities. The EA examined the potential environmental impacts of the proposed action and evaluated reasonable alternatives, including the no action alternative in accordance with the Council on Environmental Quality (CEQ) Regulations (40 CFR Parts 1500-1508). Based on the environmental analysis in the attached EA, the proposed action will not have a significant effect on the human environment within the meaning of the National Environmental Policy Act (NEPA) and 40 CFR Parts 1508.18 and 1508.27. The selected action (the proposed alternative) is composed of the following elements, each described or evaluated in the attached EA on the pages referenced. The proposed action is expected to begin in 1997 and will be completed within three years: design and construction of a new facility at the Central Facility Area of the INEL; operation of the facility, including instrument receipt, inspections and repairs, precision testing and calibration, and storage and issuance. The selected action will result in no significant environmental impacts

  12. 30 CFR 57.4203 - Extinguisher recharging or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Extinguisher recharging or replacement. 57.4203 Section 57.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Prevention and Control Firefighting Equipment § 57.4203 Extinguisher recharging or replacement. Fire...

  13. 30 CFR 56.4203 - Extinguisher recharging or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Extinguisher recharging or replacement. 56.4203 Section 56.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Prevention and Control Firefighting Equipment § 56.4203 Extinguisher recharging or replacement. Fire...

  14. Thyroid hormone replacement therapy

    NARCIS (Netherlands)

    Wiersinga, W. M.

    2001-01-01

    Thyroid hormone replacement has been used for more than 100 years in the treatment of hypothyroidism, and there is no doubt about its overall efficacy. Desiccated thyroid contains both thyroxine (T(4)) and triiodothyronine (T(3)); serum T(3) frequently rises to supranormal values in the absorption

  15. Ablative dual-phase Erbium:YAG laser treatment of atrophy-related vaginal symptoms in post-menopausal breast cancer survivors omitting hormonal treatment.

    Science.gov (United States)

    Mothes, A R; Runnebaum, M; Runnebaum, I B

    2018-05-01

    First evaluation of dual-phase vaginal Er:YAG laser to omit hormonal treatment for atrophy-related symptoms in post-menopausal breast cancer survivors following prolapse surgery. Patients with a history of breast cancer at the time of surgery for pelvic organ prolapse were offered non-hormonal vaginal Er:YAG laser treatment when complaining of atrophy-related genitourinary syndrome of menopause. A single 10-min course of dual-phase protocol of pulsed Er:YAG laser (2940 nm, fractional ablative and thermal mode, fluence according to tissue thickness). Follow-up included subjective satisfaction, vaginal pH, vaginal health index (VHI), and complications after 6 weeks. A total of 16 breast cancer survivors (age 71 years, SD 7) had been seeking treatment for pelvic floor symptoms related to vaginal atrophy at follow-up visits after prolapse surgery. All ablative vaginal Er:YAG laser outpatient procedures were successfully completed, all patients returned to daily activities without a need for analgetic medication. Evaluation was performed after 8.3 (SD 2.5) weeks. Pre-laser VHI scored 16 (SD 4.6) and post-laser VHI 20 (SD 3) with p = 0.01. Patients were satisfied in 94% (n = 15) regarding symptom relief. Breast cancer survivors with atrophy-related complaints after pelvic floor surgery may benefit from vaginal application of this innovative dual protocol of Er:YAG laser technology as a non-hormonal treatment approach.

  16. Vascular complications associated with transcatheter aortic valve replacement.

    Science.gov (United States)

    Sardar, M Rizwan; Goldsweig, Andrew M; Abbott, J Dawn; Sharaf, Barry L; Gordon, Paul C; Ehsan, Afshin; Aronow, Herbert D

    2017-06-01

    Transcatheter aortic valve replacement (TAVR) is now an accepted pathway for aortic valve replacement for patients who are at prohibitive, severe and intermediate risk for traditional aortic valve surgery. However, with this rising uptrend and adaptation of this new technology, vascular complications and their management remain an Achilles heel for percutaneous aortic valve replacement. The vascular complications are an independent predictor of mortality for patients undergoing TAVR. Early recognition of these complications and appropriate management is paramount. In this article, we review the most commonly encountered vascular complications associated with currently approved TAVR devices and their optimal percutaneous management techniques.

  17. Replacement energy, capacity, and reliability costs for permanent nuclear reactor shutdowns

    International Nuclear Information System (INIS)

    VanKuiken, J.C., Buehring, W.A.; Hamilton, S.; Kavicky, J.A.; Cavallo, J.D.; Veselka, T.D.; Willing, D.L.

    1993-10-01

    Average replacement power costs are estimated for potential permanent shutdowns of nuclear electricity-generating units. Replacement power costs are considered to include replacement energy, capacity, and reliability cost components. These estimates were developed to assist the US Nuclear Regulatory Commission in evaluating regulatory issues that potentially affect changes in serious reactor accident frequencies. Cost estimates were derived from long-term production-cost and capacity expansion simulations of pooled utility-system operations. Factors that affect replacement power cost, such as load growth, replacement sources of generation, and capital costs for replacement capacity, were treated in the analysis. Costs are presented for a representative reactor and for selected subcategories of reactors, based on estimates for 112 individual reactors

  18. Severe Heterotopic Ossification following Total Knee Replacement

    Directory of Open Access Journals (Sweden)

    Alexander L. Dodds

    2014-01-01

    Full Text Available Although the incidence of minor heterotopic ossification is probably higher than what is usually expected, severe heterotopic ossification (HO is an extremely rare event following total knee replacement surgery. We present the case of a 66-year-old woman who initially had achieved an excellent range of motion following bilateral uncemented rotating platform total knee replacement, before presenting with pain and loss of range of motion at 2 months after surgery. Severe HO was diagnosed on X-rays. Treatment consisted of nonoperative measures only, including physiotherapy with hydrotherapy and anti-inflammatories. She eventually regained her range of motion when seen at 8 months after operation. This case illustrates that nonoperative treatment without the use of radiotherapy or surgery can be used to safely resolve stiffness caused by HO after total knee replacement.

  19. The use of adaptive equipment following total knee replacement

    OpenAIRE

    McNaught, Jamie; Paul, Lorna

    2015-01-01

    Introduction: This study evaluates the need for adaptive equipment following total knee replacement. There are no recent studies to guide occupational therapists in the optimum time adaptive equipment is required following total knee replacement.\\ud \\ud Method: A non-experimental, concurrent mixed methods approach was used. The study population was patients attending for total knee replacement at a large general hospital. Outcome measures were the Oxford Knee Score, the United Kingdom Functio...

  20. Management of large scale coolant channel replacement programme for Indian PHWRs

    International Nuclear Information System (INIS)

    Bhatnagar, V.K.; Chadda, S.K.; Arya, R.C.

    1994-01-01

    Coolant channel assemblies form most important core components of pressurised heavy water reactors. Zirconium alloy pressure tube which form part of coolant channel assemblies are subjected to environment of high neutron flux, high pressure and temperature. Under those operating environmental conditions, the pressure tubes material undergoes degradation of metallurgical and mechanical properties in addition to dimensional changes. The coolant channels are subjected to an in-service inspection (ISI) programme for monitoring the health particularly of the pressure tubes. The en-mass replacement of pressure tubes is needed after most of the pressure tubes show unacceptable conditions for an assured safe and reliable operation. An overview of various issues pertaining to this aspect is presented. (author). 4 figs

  1. New energy replacement method for resonant power supplies

    International Nuclear Information System (INIS)

    Karady, G.G.; Thiessen, H.A.

    1989-01-01

    The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab

  2. Replacement Condition Detection of Railway Point Machines Using an Electric Current Sensor.

    Science.gov (United States)

    Sa, Jaewon; Choi, Younchang; Chung, Yongwha; Kim, Hee-Young; Park, Daihee; Yoon, Sukhan

    2017-01-29

    Detecting replacement conditions of railway point machines is important to simultaneously satisfy the budget-limit and train-safety requirements. In this study, we consider classification of the subtle differences in the aging effect-using electric current shape analysis-for the purpose of replacement condition detection of railway point machines. After analyzing the shapes of after-replacement data and then labeling the shapes of each before-replacement data, we can derive the criteria that can handle the subtle differences between "does-not-need-to-be-replaced" and "needs-to-be-replaced" shapes. On the basis of the experimental results with in-field replacement data, we confirmed that the proposed method could detect the replacement conditions with acceptable accuracy, as well as provide visual interpretability of the criteria used for the time-series classification.

  3. Reducing invasiveness, duration, and cost of magnetic resonance imaging in rheumatoid arthritis by omitting intravenous contrast injection -- Does it change the assessment of inflammatory and destructive joint changes by the OMERACT RAMRIS?

    DEFF Research Database (Denmark)

    Østergaard, Mikkel; Conaghan, Philip G; O'Connor, Philip

    2009-01-01

    OBJECTIVE: Gadolinium (Gd)-enhanced magnetic resonance imaging (MRI) provides highly sensitive assessment of inflammatory and destructive changes in rheumatoid arthritis (RA) joints, but intravenous (IV) Gd injection prolongs examination time and increases cost, invasiveness, and patient discomfort...... images, whereas complete image sets were available for the second reading. RESULTS: Gd contrast injection appeared unimportant to MRI scores of bone erosions and bone edema in RA wrist and MCP joints. However, when post-Gd MRI was considered the standard reference, MRI without Gd provided only moderate......: Omitting IV contrast injection did not change scores of bone erosions and bone edema, but decreased the reliability of synovitis scores. However, this disadvantage may for some purposes be outweighed by the possibility to assess more joints and/or greater feasibility....

  4. Infective endocarditis following percutaneous pulmonary valve replacement

    DEFF Research Database (Denmark)

    Cheung, Gary; Vejlstrup, Niels; Ihlemann, Nikolaj

    2013-01-01

    Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult.......Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult....

  5. Towards computer-assisted surgery in shoulder joint replacement

    Science.gov (United States)

    Valstar, Edward R.; Botha, Charl P.; van der Glas, Marjolein; Rozing, Piet M.; van der Helm, Frans C. T.; Post, Frits H.; Vossepoel, Albert M.

    A research programme that aims to improve the state of the art in shoulder joint replacement surgery has been initiated at the Delft University of Technology. Development of improved endoprostheses for the upper extremities (DIPEX), as this effort is called, is a clinically driven multidisciplinary programme consisting of many contributory aspects. A part of this research programme focuses on the pre-operative planning and per-operative guidance issues. The ultimate goal of this part of the DIPEX project is to create a surgical support infrastructure that can be used to predict the optimal surgical protocol and can assist with the selection of the most suitable endoprosthesis for a particular patient. In the pre-operative planning phase, advanced biomechanical models of the endoprosthesis fixation and the musculo-skeletal system of the shoulder will be incorporated, which are adjusted to the individual's morphology. Subsequently, the support infrastructure must assist the surgeon during the operation in executing his surgical plan. In the per-operative phase, the chosen optimal position of the endoprosthesis can be realised using camera-assisted tools or mechanical guidance tools. In this article, the pathway towards the desired surgical support infrastructure is described. Furthermore, we discuss the pre-operative planning phase and the per-operative guidance phase, the initial work performed, and finally, possible approaches for improving prosthesis placement.

  6. 9 CFR 82.15 - Replacement birds and poultry.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Replacement birds and poultry. 82.15... AGRICULTURE INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS EXOTIC NEWCASTLE DIS- EASE (END) AND CHLAMYDIOSIS Exotic Newcastle Disease (END) § 82.15 Replacement birds and poultry. Birds...

  7. 30 CFR 57.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 57.12036 Section 57.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12036 Fuse removal or replacement. Fuses shall not be removed or...

  8. On Foundation Improvement By Sand Replacement | Abam | Global ...

    African Journals Online (AJOL)

    This paper describes a simple foundation improvement method involving the replacement of poor foundation bearing soils with sand and the resultant improvement in bearing capacity and the minimization of settlement at the site of a large storage tank. Minimum thickness of sand replacement for various foundation loads ...

  9. Waiting for total knee replacement surgery: factors associated with pain, stiffness, function and quality of life

    Directory of Open Access Journals (Sweden)

    Dionne Clermont E

    2009-05-01

    Full Text Available Abstract Background Recent evidences show that education and rehabilitation while waiting for knee replacement have positive effects on the patients' health status. Identification of factors associated with worse pain, function and health-related quality of life (HRQoL while waiting for surgery could help develop pre-surgery rehabilitation interventions that target specifically these factors and prioritize patients that may benefit the most from them. The objectives of this study were to measure pain, stiffness, function and HRQoL in patients at enrolment on waiting lists for knee replacement and to identify demographic, clinical, socioeconomic and psychosocial characteristics associated with these outcomes. Methods This study is part of a broader study measuring the effects of pre-surgery wait in patients scheduled for knee replacement. From 02/2006 to 09/2007, 197 patients newly scheduled for total knee replacement were recruited from the waiting lists of three university hospitals in Quebec City, Canada. Pain, stiffness and function were measured with the Western Ontario and McMaster Osteoarthritis Index (WOMAC and HRQoL was measured with the SF-36 Health Survey. Stepwise multiple regression analysis was used to assess the strength of the associations between the independent variables and the WOMAC and SF-36 scores. Results The scores of all eight HRQoL physical and mental domains of the SF-36 were significantly lower than aged matched Canadian normative data (p Conclusion Patients waiting for knee replacement have poor function and HRQoL. Characteristics that were found to be associated with these outcomes could help develop pre-surgery rehabilitation program and prioritize patients that may benefit the most from them. Such programs could include interventions to reduce psychological distress, therapeutic exercises targeting both knees and weight loss management.

  10. The efficacy of surfactant replacement therapy in the growth restricted preterm infant: what is the evidence?

    Directory of Open Access Journals (Sweden)

    Atul eMalhotra

    2014-10-01

    Full Text Available Background: Surfactant replacement therapy (SRT is an integral part of management of preterm surfactant deficiency (respiratory distress syndrome, RDS. Its role in the management of RDS has been extensively studied. However its efficacy in the management of lung disease in preterm infants born with intrauterine growth restriction (IUGR has not been systematically studied.Objective: To evaluate the efficacy of exogenous surfactant replacement therapy in the management of preterm IUGR lung disease. Methods: A systematic search of all available randomised clinical trials (RCT of surfactant replacement therapy in preterm IUGR infants was done according to the standard Cochrane collaboration search strategy. Neonatal respiratory outcomes were compared between the preterm IUGR and appropriately-grown for gestational age (AGA preterm infant populations in eligible studies. Results: No study was identified which evaluated the efficacy or responsiveness of exogenous surfactant replacement therapy in preterm IUGR infants as compared to preterm AGA infants. The only study identified through the search strategy used small for gestational age (SGA; defined as less than 10th centile for birth weight as a proxy for IUGR. The RCT evaluated the efficacy or responsiveness of SRT in preterm SGA group as compared to AGA infants. The rate of intubation, severity of RDS, rate of surfactant administration, pulmonary air leaks and days on the ventilator did not differ between both groups. However, the requirement for prolonged nasal CPAP (p< 0.001, supplemental oxygen therapy (p <0.01 and the incidence of bronchopulmonary dysplasia at 28 days and 36 weeks (both p<0.01 was greater in SGA infants. Discussion: There is currently insufficient data available to evaluate the efficacy of SRT in preterm IUGR lung disease. A variety of research strategies will be needed to enhance our understanding of the role and rationale for use of surfactant replacement therapy in preterm

  11. Optimization on replacement and inspection period of plant equipment

    International Nuclear Information System (INIS)

    Takase, Kentaro; Kasai, Masao

    2004-01-01

    Rationalization of the plant maintenance is one of the main topics being investigated in Japanese nuclear power industries. Optimization of the inspection and replacement period of equipments is effective for the maintenance cost reduction. The more realistic model of the replacement policy is proposed in this study. It is based on the classical replacement policy model and its cost is estimated. Then, to consider the inspection for the maintenance, the formulation that includes the risk concept is discussed. Based on it, two variations of the combination of the inspection and the replacement are discussed and the costs are estimated. In this study the effect of the degradation of the equipment is important. The optimized maintenance policy depends on the existence of significant degradation. (author)

  12. 30 CFR 872.29 - What are prior balance replacement funds?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false What are prior balance replacement funds? 872... § 872.29 What are prior balance replacement funds? “Prior balance replacement funds” are moneys we must... general funds of the United States Treasury that are otherwise unappropriated. Under section 411(h)(1) of...

  13. A Hybrid Integrated Laboratory and Inquiry-Based Research Experience: Replacing Traditional Laboratory Instruction with a Sustainable Student-Led Research Project

    Science.gov (United States)

    Hartings, Matthew R.; Fox, Douglas M.; Miller, Abigail E.; Muratore, Kathryn E.

    2015-01-01

    The Department of Chemistry at American University has replaced its junior- and senior-level laboratory curriculum with two, two-semester long, student-led research projects as part of the department's American Chemical Society-accredited program. In the first semester of each sequence, a faculty instructor leads the students through a set of…

  14. End-cap calorimeter performance and identification of the t-channel single top quark process with the ATLAS detector

    CERN Document Server

    Cojocaru, Claudiu D

    2008-01-01

    The LHC collider will provide proton-proton collisions with 14 TeV centre of mass energy and an expected peak luminosity of 10 34 cm -2 s -1 . ATLAS is one of the multipurpose detectors that will be used for particles detection and measurement of properties. The first part of this thesis focuses on the study of the response of the ATLAS electromagnetic and hadronic end-cap calorimeters (EMEC and HEC, respectively) in a beam test performed in the summer of 2002. For the EMEC, the dependence of the measured signal versus the beam energy was found to be linear and an electromagnetic conversion constant [Special characters omitted.] = (0.446 ± 0.009) MeV/nA was calculated. The energy resolution for the EMEC was [Special characters omitted.] = [Special characters omitted.] ⊕ (0.4 ± 0.1)%, while for the HEC it was [Special characters omitted.] = [Special characters omitted.] ⊕ (3.0 ± 0.2)%, where the reconstructed energy, E reco , is in GeV. These results feed back into the tuning of the calorimeter Monte Ca...

  15. The cost function for the preventive - maintenance replacement problem

    OpenAIRE

    Vilaplana, Jose Perez

    1994-01-01

    Let a discounted continuous review preventive-maintenance replacement model be such that its total discounted cost is given by means of two functional equations. We assume that downtime is caused by equipment breakdowns, and the length of a given downtime is the time necessary to repair the equipment and set it back in operation. The periodic preventive replacement policy is to replace the equipment by a new identical equipment when service age X is reached, or when the equipment ...

  16. Imaging techniques in transcatheter aortic valve replacement

    Directory of Open Access Journals (Sweden)

    Quaife RA

    2013-11-01

    Full Text Available Robert A Quaife, Jennifer Dorosz, John C Messenger, Ernesto E Salcedo Division of Cardiology, University of Colorado, Aurora, CO, USA Abstract: Calcific aortic stenosis is now understood as a complex valvular degenerative process sharing many risk factors with atherosclerosis. Once patients develop symptomatic calcific aortic stenosis, the only effective treatment is aortic valve replacement. In the past decade, transcatheter aortic valve replacement (TAVR has been developed as an alternative to surgery to treat severe calcific aortic stenosis. Cardiac imaging plays a pivotal role in the contemporary management of patients with calcific aortic stenosis, and particularly in patients being considered for TAVR, who demand detailed imaging of the aortic valve apparatus. In this review, we highlight the role of cardiac imaging for patient selection, procedural guidance, and evaluation of results of TAVR. Keywords: aortic stenosis, cardiovascular imaging, transcutaneous aortic valve replacement

  17. Studies on the replacement policies in dairy cattle

    NARCIS (Netherlands)

    Arendonk, van J.A.M.

    1985-01-01

    In The Netherlands dairy farmers replace on average 25-30% of their cows each year. The decision to replace instead of to keep a cow is based mainly on economic considerations rather than because a cow is no longer able to produce.

    The investigations described in this thesis were

  18. 22 CFR 42.74 - Issuance of new or replacement visas.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Issuance of new or replacement visas. 42.74... IMMIGRATION AND NATIONALITY ACT, AS AMENDED Issuance of Immigrant Visas § 42.74 Issuance of new or replacement...) Replacement immigrant visa for an immediate relative or for an alien subject to numerical limitation. (1) A...

  19. Replacement of heavy components of the Main Primary System (MPS). Recent innovations made by Framatome ANP

    International Nuclear Information System (INIS)

    Chanussot, J.M.; Thevenet, R.

    2006-01-01

    condition of the various penetrations (lateral or from above, for instrumentation, unloading, spraying, etc.): - Complete replacement of the component (including dissimilar metal welds, thermal sleeves and even a section of the surge line if necessary); - Bottom replacement; - Replacement of faulty penetrations only. Along with the regular replacement of molded Main Primary System elbows (SGR operations), the following actions have also been carried out: - Replacement of a half crossover leg (SGR-GR4, 2000); - Replacement of a cold leg section (RCLS) with a chemical and volume control system (CVCS) nozzle (SGR-FH1, 2002). In the future we predict work will be carried out on the pressurizer surge line (potentially carried out as part of a pressurizer changeover or as a stand-alone operation). This presentation will focus on the major innovations developed by Framatome ANP, aided by its international customers in order to carry out these primary component replacement operations as well and as quickly as possible. These innovations concern the following domains: - Hoisting and handling; - Metrology and topo-metry; - Machining and welding; - Automated operations in piping; - Operation management. In conclusion one stresses that to increase the lifetime of their nuclear plants, optimize outages and sometimes increase thermal and electrical power it is necessary to optimize the replacement of heavy primary components. To meet the operator needs, suppliers must in turn enhance their capacity and skills in terms of: - Providing near-turnkey services (supplies and work); - Orchestrating these operations (i.e. by performing the duties of an engineering department); - Providing services in a range of fields, from concrete to instrumentation and control, and even performance testing; - Being technically innovative in all of these areas. Since the 1990's, with the assistance of its worldwide customer base, Framatome ANP has been carrying out this approach thanks to its experience as a

  20. Valve assembly having remotely replaceable bearings

    International Nuclear Information System (INIS)

    Johnson, E.R.; Tanner, D.E.

    1980-01-01

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings

  1. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  2. Midterm Results of Aortic Valve Replacement with Cryopreserved Homografts

    Directory of Open Access Journals (Sweden)

    Emre Özker

    2012-06-01

    Full Text Available Objective: The aim of this study was to analyze the midterm clinical results of aortic valve replacement with cryopreserved homografts.Materials and Methods: Aortic valve replacement was performed in 40 patients with cryopreserved homograft. The indications were aortic valve endocarditis in 20 patients (50%, truncus arteriosus in 6 patients (15%, and re-stenosis or regurtitation after aortic valve reconstruction in 14 (35% patients. The valve sizes ranged from 10 to 27mm. A full root replacement technique was used for homograft replacement in all patients.Results: The 30-day postoperative mortality rate was 12.5% (5 patients. There were four late deaths. Only one of them was related to cardiac events. Overall mortality was 22.5%. Thirty-three patients were followed up for 67±26 months. Two patients needed reoperation due to aortic aneurysm caused by endocarditis. The mean transvalvular gradient significantly decreased after valve replacement (p<0.003. The last follow up showed that the 27 (82% patients had a normal left ventricular function.Conclusion: Cryopreserved homografts are safe alternatives to mechanical valves that can be used when there are proper indications. Although it has a high perioperative mortality rate, cryopreserved homograft implantation is an alternative for valve replacement, particularly in younger patients and for complex surgical problems such as endocarditis that must be minimalized.

  3. Esophageal replacement in children: Challenges and long-term outcomes

    Directory of Open Access Journals (Sweden)

    Giampiero Soccorso

    2016-01-01

    Full Text Available Replacement of a nonexistent or damaged esophagus continues to pose a significant challenge to pediatric surgeons. Various esophageal replacement grafts and techniques have not produced consistently good outcomes to emulate normal esophagus. Therefore, many techniques are still being practiced and recommended with no clear consensus. We present a concise literature review of the currently used techniques and with discussions on the advantages and anticipated morbidity. There are no randomized controlled pediatric studies to compare different types of esophageal replacements. Management and graft choice are based on geographical and personal predilections rather than on any discernible objective data. The biggest series with long-term outcome are reported for gastric transposition and colonic replacement. Comparison of different studies shows no significant difference in early (graft necrosis and anastomotic leaks or late complications (strictures, poor feeding, gastro-esophageal reflux, tortuosity of the graft, and Barrett′s esophagus. The biggest series seem to have lower complications than small series reflecting the decennials experience in their respective centers. Long-term follow-up is recommended following esophageal replacement for the development of late strictures, excessive tortuosity, and Barrett′s changes within the graft. Once child overcomes initial morbidity and establishes oral feeding, long-term consequences and complications of pediatric esophageal replacement should be monitored and managed in adult life.

  4. Does Online Marketing Truly Replace Traditional Marketing?

    OpenAIRE

    Gunawan, Emilia Margareth

    2013-01-01

    This review explains the way how online marketing has been replacing traditional marketing in terms of marketing mix. This replacement might happen, because online marketing can give advantages, i.e., offering on-time delivery, increasing effectiveness of two way interactions between buyer and seller, and creating online communities (Szmigin, et al, 2005). The transition of atoms to bits format reflects that tangible products in traditional marketing is being digitalized. The marketing strate...

  5. Meal Replacement Mass Reduction Integration and Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Douglas, G.; Schneiderman, J.; Slack, K.; Whitmire, A.; Williams, T.; Young, M.

    2018-01-01

    The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore we are challenged to reduce the mass of the food system by 10% while maintaining safety, nutrition, and acceptability to support crew health and performance for exploration missions. Meal replacement with nutritionally balanced, 700-900 calorie bars was identified as a method to reduce mass. However, commercially available products do not meet the requirements for a meal replacement in the spaceflight food system. The purpose of this task was to develop a variety of nutritionally balanced, high quality, breakfast replacement bars, which enable a 10% food mass savings. To date, six nutrient-dense meal replacement bars have been developed, all of which meet spaceflight nutritional, microbiological, sensory, and shelf-life requirements. The four highest scoring bars were evaluated based on final product sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. color and texture), and microbiological compliance over a period of two years to predict long-term acceptability. All bars maintained overall acceptability throughout the first year of storage, despite minor changes in color and texture. However, added vitamins C, B1, and B9 degraded rapidly in fortified samples of Banana Nut bars, indicating the need for additional development. In addition to shelf-life testing, four bar varieties were evaluated in the Human Exploration Research Analog (HERA), campaign 3, to assess the frequency with which actual meal replacement options may be implemented, based on impact to satiety and psychosocial measurements. Crewmembers (n=16) were asked to consume meal replacement bars every day for the first fifteen days of the mission and every three days for the second half of the mission. Daily surveys assessed the crew's responses to bar acceptability, mood, food fatigue and perceived stress. Preliminary results indicate that the

  6. Materials characterization studies on LANA75/85 materials for replacement beds

    Energy Technology Data Exchange (ETDEWEB)

    Shanahan, Kirk L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-12-30

    During FY15 and FY16, a purchase order (PO) was placed with Japan Metals and Chemicals, USA after an open bidding procurement process for 282 kg of LaNi4.25Al0.75 and 226 kg. of LaNi4.15Al0.85. These materials were to be used in Tritium Facility replacement beds for existing beds that have reached the end of their useful life. As part of the PO, a 100 g. sample of each material was delivered to the SRNL Hydrogen Processing Group for characterization studies as is typically done for all newly acquired hydride materials. The PO actually employed a “trust but verify” approach where JMCUSA was allowed to ship materials it felt met specifications without SRS confirmation, as long as the data used to do so was delivered to SRS as part of the PO documentation package. Subsequent SRNL analysis revealed that the material met all specifications and was of very high quality. This report documents those findings.

  7. Joint Replacement Surgery: Health Information Basics for You and Your Family

    Science.gov (United States)

    ... Initiative Breadcrumb Home Health Topics English Español Joint Replacement Surgery Basics In-Depth Download Download EPUB Download ... What is it? Points To Remember About Joint Replacement Surgery Joint replacement surgery removes damaged or diseased ...

  8. 42 CFR 84.194 - Filters used with chemical cartridges; location; replacement.

    Science.gov (United States)

    2010-10-01

    ...; replacement. 84.194 Section 84.194 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN...; replacement. (a) Particulate matter filters used in conjunction with a chemical cartridge shall be located on... replacement on the cartridge. ...

  9. Modifications to Replacement Costs System

    International Nuclear Information System (INIS)

    Godec, M.

    1989-01-01

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985

  10. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves.

    Science.gov (United States)

    Gilbert, M S; Pantophlet, A J; van den Borne, J J G C; Hendriks, W H; Schols, H A; Gerrits, W J J

    2016-02-01

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy and protein metabolism in veal calves. Forty male Holstein-Friesian calves (114±2.4 kg) were fed milk replacer containing 46% lactose (CON) or 31% lactose and 15% of glucose (GLUC), fructose (FRUC), or glycerol (GLYC). Solid feed was provided at 10 g of dry matter (DM)/kg of metabolic body weight (BW(0.75)) per day. After an adaptation of 48 d, individual calves were harnessed, placed in metabolic cages, and housed in pairs in respiration chambers. Apparent total-tract disappearance of DM, energy, and N and complete energy and N balances were measured. The GLUC, FRUC, and GLYC calves received a single dose of 1.5 g of [U-(13)C]glucose, [U-(13)C]fructose, or [U-(13)C]glycerol, respectively, with their milk replacer at 0630 h and exhaled (13)CO2 and (13)C excretion with feces was measured. Apparent total-tract disappearance was decreased by 2.2% for DM, 3.2% for energy, and 4.2% for N in FRUC compared with CON calves. Energy and N retention did not differ between treatments, and averaged 299±16 kJ/kg of BW(0.75) per day and 0.79±0.04 g/kg of BW(0.75) per day, respectively, although FRUC calves retained numerically less N (13%) than other calves. Recovery of (13)C isotopes as (13)CO2 did not differ between treatments and averaged 72±1.6%. The time at which the maximum rate of (13)CO2 production was reached was more than 3 h delayed for FRUC calves, which may be explained by a conversion of fructose into other substrates before being oxidized. Recovery of (13)C in feces was greater for FRUC calves (7.7±0.59%) than for GLUC (1.0±0.27%) and GLYC calves (0.5±0.04%), indicating incomplete absorption of fructose from the small intestine resulting in fructose excretion or

  11. Prevalence of Total Hip and Knee Replacement in the United States.

    Science.gov (United States)

    Maradit Kremers, Hilal; Larson, Dirk R; Crowson, Cynthia S; Kremers, Walter K; Washington, Raynard E; Steiner, Claudia A; Jiranek, William A; Berry, Daniel J

    2015-09-02

    Descriptive epidemiology of total joint replacement procedures is limited to annual procedure volumes (incidence). The prevalence of the growing number of individuals living with a total hip or total knee replacement is currently unknown. Our objective was to estimate the prevalence of total hip and total knee replacement in the United States. Prevalence was estimated using the counting method by combining historical incidence data from the National Hospital Discharge Survey and the Healthcare Cost and Utilization Project (HCUP) State Inpatient Databases from 1969 to 2010 with general population census and mortality counts. We accounted for relative differences in mortality rates between those who have had total hip or knee replacement and the general population. The 2010 prevalence of total hip and total knee replacement in the total U.S. population was 0.83% and 1.52%, respectively. Prevalence was higher among women than among men and increased with age, reaching 5.26% for total hip replacement and 10.38% for total knee replacement at eighty years. These estimates corresponded to 2.5 million individuals (1.4 million women and 1.1 million men) with total hip replacement and 4.7 million individuals (3.0 million women and 1.7 million men) with total knee replacement in 2010. Secular trends indicated a substantial rise in prevalence over time and a shift to younger ages. Around 7 million Americans are living with a hip or knee replacement, and consequently, in most cases, are mobile, despite advanced arthritis. These numbers underscore the substantial public health impact of total hip and knee arthroplasties. Copyright © 2015 by The Journal of Bone and Joint Surgery, Incorporated.

  12. 33 CFR 1.26-5 - Replacement of medals.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Replacement of medals. 1.26-5 Section 1.26-5 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL... Rentals § 1.26-5 Replacement of medals. (a) A medal, or a bar, emblem, or insignia in lieu thereof, that...

  13. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  14. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  15. Machine replacement, Network Externalities and Investment Cycles

    OpenAIRE

    Juan Ruiz

    2003-01-01

    This paper presents a model where agents decide on the timing of replacement of ageing machines. The optimal replacement policy for an agent is influenced by other agents' decisions because the productivity of a particular vintage displays network externalities that set in with a lag. In equilibrium, agents follow innovation cycles with a frequency that is lower than optimal, so there is too much delay. One extreme case is the possibility of inefficient collapse: for some parameters there is ...

  16. OPTIMIZATION MODEL FOR VEHICLE ROUTING AND EQUIPMENT REPLACEMENT IN FARM MACHINERY

    OpenAIRE

    Grano, Carolina; Abensur, Eder

    2017-01-01

    ABSTRACT: An equipment replacement decision takes into account economic engineering models based on discounted cash flow (DCF) such as the Annual Equivalent Cost (AEC). Despite a large number of researches on industrial assets replacement, there is a lack of studies applied to farm goods. This study aimed at assessing an alternative model for economic decision analysis on farm machinery replacement, with no restrictions on the number of replacements and assessed goods during a defined timelin...

  17. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. A 'personnel office' stamped photocopy of the old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), between 8:30 and 12:30, in order to fill a 'fiche individuelle' form (in black ink only), which has to be personally signed by themselves and another separately signed by members of their family, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format (signed on the back) The French card in their possession an A4 photocopy of the same Fre...

  18. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  19. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  20. Extended replacement of the thoracic aorta.

    Science.gov (United States)

    Hino, Yutaka; Okada, Kenji; Oka, Takanori; Inoue, Takeshi; Tanaka, Akiko; Omura, Atsushi; Kano, Hiroya; Okita, Yutaka

    2013-01-01

    We present our experience of total aortic arch replacement. Twenty-nine patients (21 males and 8 females; mean age 63.3 ± 13.3 years) with extended thoracic aortic aneurysms underwent graft replacement. The pathology of the diseased aorta was non-dissecting aneurysm in 11 patients, including one aortitis and aortic dissection in 18 patients (acute type A: one, chronic type A: 11, chronic type B: six). Five patients had Marfan syndrome. In their previous operation, two patients had undergone the Bentall procedure, three had endovascular stenting, one had aortic root replacement with valve sparing and 12 had hemi-arch replacement for acute type A dissection. Approaches to the aneurysm were as follows: posterolateral thoracotomy with rib-cross incision in 16, posterolateral thoracotomy extended to the retroperitoneal abdominal aorta in seven, mid-sternotomy and left pleurotomy in three, anterolateral thoracotomy with partial lower sternotomy in two and clam-shell incision in one patient. Extension of aortic replacement was performed from the aortic root to the descending aorta in 4, from the ascending aorta to the descending aorta in 17 and from the ascending to the abdominal aorta in eight patients. Arterial inflow for cardiopulmonary bypass consisted of the femoral artery in 15 patients, ascending aorta and femoral artery in seven, descending or abdominal aorta in five and ascending aorta in two. Venous drainage site was the femoral vein in 10, pulmonary artery in eight, right atrium in five, femoral artery with right atrium/pulmonary artery in four and pulmonary artery with right atrium in two patients. The operative mortality, 30-day mortality and hospital mortality was one (cardiac arrest due to aneurysm rupture), one (rupture of infected aneurysm) and one (brain contusion), respectively. Late mortality occurred in three patients due to pneumonia, ruptured residual aneurysm and intracranial bleeding. Actuarial survival at 5 years after the operations was 80.6

  1. Coupling Adaptation Tipping Points and Engineering Options: New Insights for Resilient Water Infrastructure Replacement Planning

    Science.gov (United States)

    Smet, K.; de Neufville, R.; van der Vlist, M.

    2017-12-01

    This work presents an innovative approach for replacement planning for aging water infrastructure given uncertain future conditions. We draw upon two existing methodologies to develop an integrated long-term replacement planning framework. We first expand the concept of Adaptation Tipping Points to generate long-term planning timelines that incorporate drivers of investment related to both internal structural processes as well as changes in external operating conditions. Then, we use Engineering Options to explore different actions taken at key moments in this timeline. Contrasting to the traditionally more static approach to infrastructure design, designing the next generation of infrastructure so it can be changed incrementally is a promising method to safeguard current investments given future uncertainty. This up-front inclusion of structural options in the system actively facilitates future adaptation, transforming uncertainty management in infrastructure planning from reactive to more proactive. A two-part model underpins this approach. A simulation model generates diverse future conditions, allowing development of timelines of intervention moments in the structure's life. This feeds into an economic model, evaluating the lifetime performance of different replacement strategies, making explicit the value of different designs and their flexibility. A proof of concept study demonstrates this approach for a pumping station. The strategic planning timelines for this structure demonstrate that moments when capital interventions become necessary due to reduced functionality from structural degradation or changed operating conditions are widely spread over the structure's life. The disparate timing of these necessary interventions supports an incremental, adaptive mindset when considering end-of-life and replacement decisions. The analysis then explores different replacement decisions, varying the size and specific options included in the proposed new structure

  2. Slab replacement maturity guidelines : [summary].

    Science.gov (United States)

    2014-04-01

    Concrete sets in hours at moderate temperatures, : but the bonds that make concrete strong continue : to mature over days to years. However, for : replacement concrete slabs on highways, it is : crucial that concrete develop enough strength : within ...

  3. Service water system repair/replacement guidelines: Planning and implementation

    International Nuclear Information System (INIS)

    Frederick, G.J.; Gandy, D.W.; Peterson, A.G. Jr.; Findlan, S.J.

    1993-11-01

    Service water system failures have prompted concerns related to extended power plant operating life and plant availability. Selection and procurement of materials for repair or replacement of piping and components may be the most important factors in improving service water system reliability. The authors examined factors that contribute to reduced SWS reliability. The factors include material selection inadequacies, water treatment problems, operational/maintenance practices, fabrication procedures, environmental degradation mechanisms, and coating problems. The authors investigated material selection for replacement and repair, taking into account fabrication practices, environmental concerns, and cost comparisons of materials. They examined specific components such as piping, pumps, valves, and heat exchangers with regard to material selection and fabrication practice. Although proper material selection is essential in upgrading and maintaining the designed functions of a SWS, it is critical to address SWS repair/replacement activities with a systemwide approach. Degradation of materials in SWS applications are plant specific, depending on factors unique to each site such as geographic location, existing materials, operating procedures, and environment. All these characteristics must be addressed in making repair/replacement decisions. Criteria that must be integrated for successful long-term operation of SWS include the following: Materials selection (upgrade or in-kind replacement), Evaluation of root cause or nature of the failure mechanism, Scope of the repair/replacement activities, Material compatibility of the existing materials, Operational and maintenance procedures, Code or jurisdictional requirements, Economic considerations, Water treatment programs, System design improvements or modifications

  4. Antibiotic Dosing in Continuous Renal Replacement Therapy.

    Science.gov (United States)

    Shaw, Alexander R; Mueller, Bruce A

    2017-07-01

    Appropriate antibiotic dosing is critical to improve outcomes in critically ill patients with sepsis. The addition of continuous renal replacement therapy makes achieving appropriate antibiotic dosing more difficult. The lack of continuous renal replacement therapy standardization results in treatment variability between patients and may influence whether appropriate antibiotic exposure is achieved. The aim of this study was to determine if continuous renal replacement therapy effluent flow rate impacts attaining appropriate antibiotic concentrations when conventional continuous renal replacement therapy antibiotic doses were used. This study used Monte Carlo simulations to evaluate the effect of effluent flow rate variance on pharmacodynamic target attainment for cefepime, ceftazidime, levofloxacin, meropenem, piperacillin, and tazobactam. Published demographic and pharmacokinetic parameters for each antibiotic were used to develop a pharmacokinetic model. Monte Carlo simulations of 5000 patients were evaluated for each antibiotic dosing regimen at the extremes of Kidney Disease: Improving Global Outcomes guidelines recommended effluent flow rates (20 and 35 mL/kg/h). The probability of target attainment was calculated using antibiotic-specific pharmacodynamic targets assessed over the first 72 hours of therapy. Most conventional published antibiotic dosing recommendations, except for levofloxacin, reach acceptable probability of target attainment rates when effluent rates of 20 or 35 mL/kg/h are used. Copyright © 2017 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  5. Delay in onset of metabolic alkalosis during regional citrate anti-coagulation in continous renal replacement therapy with calcium-free replacement solution

    Directory of Open Access Journals (Sweden)

    See Kay

    2009-01-01

    Full Text Available Regional citrate anti-coagulation for continuous renal replacement therapy chelates calcium to produce the anti- coagulation effect. We hypothesise that a calcium-free replacement solution will require less citrate and produce fewer metabolic side effects. Fifty patients, in a Medical Intensive Care Unit of a tertiary teaching hospital (25 in each group, received continuous venovenous hemofiltration using either calcium-containing or calcium-free replacement solutions. Both groups had no significant differences in filter life, metabolic alkalosis, hypernatremia, hypocalcemia, and hypercalcemia. However, patients using calcium-containing solution developed metabolic alkalosis earlier, compared to patients using calcium-free solution (mean 24.6 hours,CI 0.8-48.4 vs. 37.2 hours, CI 9.4-65, P = 0.020. When calcium-containing replacement solution was used, more citrate was required (mean 280ml/h, CI 227.2-332.8 vs. 265ml/h, CI 203.4-326.6, P = 0.069, but less calcium was infused (mean 21.2 ml/h, CI 1.2-21.2 vs 51.6ml/h, CI 26.8-76.4, P ≤ 0.0001.

  6. Structural Evaluation of the RSRM Nozzle Replacement Adhesive

    Science.gov (United States)

    Batista-Rodriguez, A.; McLennan, M. L.; Palumbos, A. V.; Richardson, D. E.

    1999-01-01

    This paper describes the structural performance evaluation of a replacement adhesive for the Reusable Solid Rocket Motor (RSRM) nozzle utilizing finite element analysis. Due to material obsolescence and industrial safety issues, the two current structural adhesives, EA 913 and EA 946 are to be replaced with a new adhesive. TIGA 321. The structural evaluation in support of the adhesive replacement effort includes residual stress, transportation, and flight analyses. Factors of safety are calculated using the stress response from each analysis. The factors of safety are used as the limiting criteria to compare the replacement adhesive against the current adhesives. Included in this paper are the analytical approach, assumptions and modeling techniques as well as the results of the evaluation. An important factor to the evaluation is the similarity in constitutive material properties (elastic modulus and Poisson's ratio) between TIGA 321 and EA 913. This similarity leads to equivalent material response from the two adhesives. However, TIGA 321 surpasses EA 913's performance due to higher material capabilities. Conversely, the change in stress response from EA 946 to TIGA 321 is more apparent: this is primarily attributed to the difference in the modulii of the two adhesives, which differ by two orders of magnitude. The results of the bondline evaluation indicate that the replacement adhesive provides superior performance than the current adhesives with only minor exceptions. Furthermore, TIGA 321 causes only a minor chance in the response of the phenolic and metal components.

  7. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...

  8. 49 CFR Appendix A to Part 665 - Tests To Be Performed at the Bus Testing Facility

    Science.gov (United States)

    2010-10-01

    ... operability of all passenger doors, passenger escape mechanisms, windows, and service doors. A water leak test..., and replacement parts or supplies required for each action during the test. The accessibility of...

  9. Hormone replacement therapy increases the risk of cranial meningioma

    DEFF Research Database (Denmark)

    Andersen, Lene; Friis, Søren; Hallas, Jesper

    2013-01-01

    We investigated the influence of hormone replacement therapy (HRT) use on the risk of meningioma in a population-based setting.......We investigated the influence of hormone replacement therapy (HRT) use on the risk of meningioma in a population-based setting....

  10. Advances in the replacement and enhanced replacement method in QSAR and QSPR theories.

    Science.gov (United States)

    Mercader, Andrew G; Duchowicz, Pablo R; Fernández, Francisco M; Castro, Eduardo A

    2011-07-25

    The selection of an optimal set of molecular descriptors from a much greater pool of such regression variables is a crucial step in the development of QSAR and QSPR models. The aim of this work is to further improve this important selection process. For this reason three different alternatives for the initial steps of our recently developed enhanced replacement method (ERM) and replacement method (RM) are proposed. These approaches had previously proven to yield near optimal results with a much smaller number of linear regressions than the full search. The algorithms were tested on four different experimental data sets, formed by collections of 116, 200, 78, and 100 experimental records from different compounds and 1268, 1338, 1187, and 1306 molecular descriptors, respectively. The comparisons showed that one of the new alternatives further improves the ERM, which has shown to be superior to genetic algorithms for the selection of an optimal set of molecular descriptors from a much greater pool. The new proposed alternative also improves the simpler and the lower computational demand algorithm RM.

  11. 21 CFR 874.3540 - Prosthesis modification instrument for ossicular replacement surgery.

    Science.gov (United States)

    2010-04-01

    ... replacement surgery. 874.3540 Section 874.3540 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF... § 874.3540 Prosthesis modification instrument for ossicular replacement surgery. (a) Identification. A prosthesis modification instrument for ossicular replacement surgery is a device intended for use by a...

  12. Changing of the guard: reducing infection when replacing neural pacemakers.

    Science.gov (United States)

    Pepper, Joshua; Meliak, Lara; Akram, Harith; Hyam, Jonathan; Milabo, Catherine; Candelario, Joseph; Foltynie, Thomas; Limousin, Patricia; Curtis, Carmel; Hariz, Marwan; Zrinzo, Ludvic

    2017-04-01

    OBJECTIVE Infection of deep brain stimulation (DBS) hardware has a significant impact on patient morbidity. Previous experience suggests that infection rates appear to be higher after implantable pulse generator (IPG) replacement surgery than after the de novo DBS procedure. In this study the authors examine the effect of a change in practice during DBS IPG replacements at their institution. METHODS Starting in January 2012, patient screening for methicillin-resistant Staphylococcus aureus (MRSA) and, and where necessary, eradication was performed prior to elective DBS IPG change. Moreover, topical vancomycin was placed in the IPG pocket during surgery. The authors then prospectively examined the infection rate in patients undergoing DBS IPG replacement at their center over a 3-year period with at least 9 months of follow-up. RESULTS The total incidence of infection in this prospective consecutive series of 101 IPG replacement procedures was 0%, with a mean follow-up duration of 24 ± 11 months. This was significantly lower than the authors' previously published historical control group, prior to implementing the change in practice, where the infection rate for IPG replacement was 8.5% (8/94 procedures; p = 0.003). CONCLUSIONS This study suggests that a change in clinical practice can significantly lower infection rates in patients undergoing DBS IPG replacement. These simple measures can minimize unnecessary surgery, loss of benefit from chronic stimulation, and costly hardware replacement, further improving the cost efficacy of DBS therapies.

  13. Nursing procedures during continuous renal replacement therapies: a national survey.

    Science.gov (United States)

    Ricci, Zaccaria; Benelli, Sonia; Barbarigo, Fabio; Cocozza, Giulia; Pettinelli, Noemi; Di Luca, Emanuela; Mettifogo, Mariangela; Toniolo, Andrea; Ronco, Claudio

    2015-01-01

    The current role of nurses in the management of critically ill patients needing continuous renal replacement therapies is clearly fundamental. The care of these complex patients is typically shared by critical care and dialysis nurses: their precise duties may vary from country to country. To clarify this issue we conducted a national-level survey at a recent Italian course on nursing practices during continuous renal replacement therapies. A total of 119 questionnaires were analysed. The participants, who were equally divided between critical care and dialysis nurses, came from 44 different hospitals and 35 Italian cities. Overall, 23% of participants answered that "the dialysis staff" were responsible for continuous renal replacement therapies in the Intensive Care Unit, while 39% answered "the critical care nurse", and 38% "a shared organization". Interestingly, less than the half of participants claimed specific continuous renal replacement therapies training was provided to employees before handling an acute dialysis machine. Finally, about 60% of participants had experience of extra-corporeal membrane oxygenation machines used in conjunction with continuous renal replacement therapies. Workload coordination and management of critically ill patients undergoing continuous renal replacement therapies in Italy is not standardized. At present, the duties of critical care and dialysis nurses vary significantly across the country. They frequently overlap or leave gaps in the assistance received by patients. The role of nurses involved in the care of continuous renal replacement therapies patients in Italy currently requires better organization, possibly starting with intensive standardized training and educational programs.

  14. Replacing carbamazepine slow-release tablets with carbamazepine suppositories: a pharmacokinetic and clinical study in children with epilepsy.

    Science.gov (United States)

    Arvidsson, J; Nilsson, H L; Sandstedt, P; Steinwall, G; Tonnby, B; Flesch, G

    1995-03-01

    A suppository for rectal administration of carbamazepine has been developed for situations in which it is unsuitable to use the oral route of administration. In an open, controlled, within-patient study, the pharmacokinetics, clinical efficacy, and tolerability of carbamazepine slow-release tablets were compared with those of carbamazepine suppositories in children with epilepsy. The pharmacokinetic part of the study comprised 22 children, and an additional nine children were included in the clinical part of the study. Treatment with slow-release tablets was replaced for 7 days with carbamazepine suppositories in bioequivalent dosage. Clinical factors such as the rate of seizures and the local tolerability were studied, and an overall assessment of efficacy was made. In the pharmacokinetic part, 24-hour plasma concentration curves for carbamazepine and carbamazepine-10,11-epoxide were recorded. The plasma concentration profiles (minimum, maximum, and mean concentrations, fluctuation index, and area under the curve) for carbamazepine and the other metabolites did not show any significant differences between oral and rectal administration when the suppository dose was increased by 25% compared to the tablets. No increase in seizure frequency was detected, and the overall assessment was very good to good in 25 of the 29 epileptic children. Increased flatulence during treatment with suppositories was noted in two children, one had anal irritation, and one had nausea/vomiting. Treatment with carbamazepine slow-release tablets in children with epilepsy can be replaced by carbamazepine suppositories in 25% higher dosage, with good clinical effect and appropriate pharmacokinetic values, when it is unsuitable to use the common oral route of administration.

  15. 76 FR 30369 - Announcement of the Award of a Replacement Grant

    Science.gov (United States)

    2011-05-25

    ... the Award of a Replacement Grant AGENCY: Office of Community Services (OCS), ACF, DHHS. ACTION: Announcement of the award of a replacement grant from the Office of Community Services to Humboldt State... Services (OCS), announces the award of a replacement grant under the Strengthening Communities Fund (SCF...

  16. Opportunity-based age replacement: exponentially distributed times between opportunities

    NARCIS (Netherlands)

    R. Dekker (Rommert); M.C. Dijkstra (Matthijs)

    1992-01-01

    textabstractThis article gives a full analysis of a component-replacement model in which preventive replacements are only possible at maintenance opportunities. These oppertunities arise according to a Poisson process, independently of failures of the component. Conditions for the existence of a

  17. An approach to solve replacement problems under intuitionistic fuzzy nature

    Science.gov (United States)

    Balaganesan, M.; Ganesan, K.

    2018-04-01

    Due to impreciseness to solve the day to day problems the researchers use fuzzy sets in their discussions of the replacement problems. The aim of this paper is to solve the replacement theory problems with triangular intuitionistic fuzzy numbers. An effective methodology based on fuzziness index and location index is proposed to determine the optimal solution of the replacement problem. A numerical example is illustrated to validate the proposed method.

  18. Replacement of major nuclear power plant components for service life extension

    International Nuclear Information System (INIS)

    Novak, S.

    1987-01-01

    Problems are discussed associated with replacement of nuclear power plant components with the aim to extend their original scheduled life. The existing foreign experience shows that it is technically feasible to replace practically all basic components for which the necessity of replacement is established. Data is summed up on the replacement of steam generators in US and West German nuclear power plants showing the duration of the job, the total consumption of manhours, the collective dose equivalent and the cost. Attention is also focused on implemented and projected replacements of circulation pipes in nuclear power plants abroad. Based on these figures, the cost is estimated of the replacement of the reactor vessel and the steam generators for WWER-440 nuclear power plants. The conclusion is arrived at that even based on a conservative estimate, the extension by 20 years of the service life of a nuclear power plant is economically more effective than the construction of a new plant. (Z.M.) 2 tabs., 15 refs., 3 figs

  19. Experimental Study on Short Circuit Phenomena in Air Switch of Distribution Line due to Sparkover between Different Poles on Which One Surge Arrester of the Three Ones is Omitted

    Science.gov (United States)

    Sato, Tomoyuki; Uemura, Satoshi; Asakawa, Akira; Yokoyama, Shigeru; Honda, Hideki; Horikoshi, Kazuhiro

    In this study, we experimentally examined the possibility of the internal short circuit of an air switch due to the sparkover between different poles under the condition that no surge arrester exists in neighboring poles and one of three surge arresters is omitted at the pole with an air switch. Experiments at Shiobara Testing Yard and Akagi Testing Center of CRIEPI clarified the following. Fault current may flow via the grounding point of a pole with an air switch and that of the next pole on a different phase from grounded phase of the pole with an air switch. If the low-voltage wire, overhead ground wire or communication wire forms a short circuit between them, ultimately the air switch may burn out. Moreover Fault current continues even if the length of the short-circuit between different poles is increased. Although the increase of the short-circuit length results in the increase of wire impedance, the amount of increase is still small compared with source impedance.

  20. Replacement and inspection policies for products with random life cycle

    International Nuclear Information System (INIS)

    Yun, Won Young; Nakagawa, Toshio

    2010-01-01

    In this paper, we consider maintenance policies for products in which the economical life cycle of products is a random variable. First, we study a periodic replacement policy with minimal repair. The system is minimally repaired at failure and is replaced by new one at age T (periodic replacement policy with minimal repair of Barlow and Hunter). The expected present value of total maintenance cost of products with random life cycle is obtained and the optimal replacement interval minimizing the cost is found. Second, we consider an inspection policy for products with random life cycle to detect the system failure. The expected total cost is obtained and the optimal inspection interval is found. Numerical examples are also included.

  1. Fluorescent Lamp Replacement Study

    Science.gov (United States)

    2017-07-01

    not be cited for purposes of advertisement. DISPOSITION INSTRUCTIONS: Destroy this document when no longer needed. Do not return to the... recycling , and can be disposed safely in a landfill. (2) LEDs offer reduced maintenance costs and fewer bulb replacements, significantly reducing... recycling . Several fixtures, ballasts and energy efficient fluorescent bulbs that were determined to be in pristine condition were returned to ATC

  2. Application of capital replacement models with finite planning horizons

    NARCIS (Netherlands)

    Scarf, P.A.; Christer, A.H.

    1997-01-01

    Capital replacement models with finite planning horizons can be used to model replacement policies in complex operational contexts. They may also be used to investigate the cost consequences of technological change. This paper reviews the application of these models in various such contexts. We also

  3. Rapid replacement/construction of bridges.

    Science.gov (United States)

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  4. QUALITY OF LIFE, COUNSELLING AND HORMONE REPLACEMENT THERAPY

    Directory of Open Access Journals (Sweden)

    Nena Kopčavar Guček

    2008-12-01

    Quality of life in menopause is a result of many factors and therefore it is very individual.Hormone replacement therapy is one of the possibilities of improvement. Therefore, it isessential that a woman is adequately informed about all the advantages and risks of thehormonal replacement therapy. Only an informed patient can be a partner in shareddecision making about the improvement of quality of life

  5. Fractal dimension evolution and spatial replacement dynamics of urban growth

    International Nuclear Information System (INIS)

    Chen Yanguang

    2012-01-01

    Highlights: ► The fractal dimension growth can be modeled by Boltzmann’s equation. ► Boltzmann’s model suggests urban spatial replacement dynamics. ► If the rate of urban growth is too high, periodic oscillations or chaos will arise. ► Chaos is associated with fractals by the fractal dimension evolution model. ► The fractal dimension of urban form implies the space-filling ratio of a city. - Abstract: This paper presents a new perspective of looking at the relation between fractals and chaos by means of cities. Especially, a principle of space filling and spatial replacement is proposed to interpret the fractal dimension of urban form. The fractal dimension evolution of urban growth can be empirically modeled with Boltzmann’s equation. For the normalized data, Boltzmann’s equation is just equivalent to the logistic function. The logistic equation can be transformed into the well-known 1-dimensional logistic map, which is based on a 2-dimensional map suggesting spatial replacement dynamics of city development. The 2-dimensional recurrence relations can be employed to generate the nonlinear dynamical behaviors such as bifurcation and chaos. A discovery is thus made in this article that, for the fractal dimension growth following the logistic curve, the normalized dimension value is the ratio of space filling. If the rate of spatial replacement (urban growth) is too high, the periodic oscillations and chaos will arise. The spatial replacement dynamics can be extended to general replacement dynamics, and bifurcation and chaos mirror a process of complex replacement.

  6. Meal Replacement Mass Reduction and Integration Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Barrett, A.; Richardson, M.; Arias, D.; Schneiderman, J.; Slack, K.; Williams, T.; Douglas, G.

    2017-01-01

    NASA, in planning for long-duration missions, has an imperative to provide a food system with the necessary nutrition, acceptability, and safety to ensure sustainment of crew health and performance. The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore the team is challenged to reduce the mass of the food system by 10% while maintaining product safety, nutrition, and acceptability. Commercially available products do not meet the nutritional requirements for a full meal replacement in the spaceflight food system, and it is currently unknown if daily meal replacements will impact crew food intake and psychosocial health over time. The purpose of this study was to develop a variety of nutritionally balanced breakfast replacement bars that meet spaceflight nutritional, microbiological, sensorial, and shelf-life requirements, while enabling a 10% savings in food mass. To date, six nutrient-dense meal replacement bars (approximately 700 calories per bar) have been developed, using traditional methods of compression as well as novel ultrasonic compression technologies developed by Creative Resonance Inc. (Phoenix, AZ). The four highest rated bars were evaluated in the Human Exploration Research Analog (HERA) to assess the frequency with which actual meal replacement options may be implemented. Specifically, overall impact of bars on mood, satiety, digestive discomfort, and satisfaction with food. These factors are currently being analyzed to inform successful implementation strategies where crew maintain adequate food intake. In addition, these bars are currently undergoing shelf-life testing to determine long-term sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. water activity and texture), and microbiological compliance over two years of storage at room temperature and potential temperature abuse conditions to predict long-term acceptability. It is expected that

  7. Use of seismic experience data for replacement and new equipment

    International Nuclear Information System (INIS)

    Johnson, H.W.; Hardy, G.S.; Horstman, N.G.; Baughman, P.D.

    1990-01-01

    Over the past seven years the use of seismic experience data to address seismic concerns has received a great deal of attention, particularly regarding the NRC Unresolved Safety Issue (USI) A-46. The Seismic Qualification Utility Group (SQUG) was formed in January 1982 to develop a practical alternative to the rigorous seismic qualification of equipment for resolution of USI A-46. The alternative method chosen is seismic experience technology. The purpose of this paper is to explore two additional potential applications of seismic experience technology: Replacement parts and New equipment/design change process. The need for, and benefits of, these applications are summarized. The available technology and the methodologies proposed are described. The methodology descriptions include a summary of the requirements for the seismic evaluations, an outline of the method, and the documentation requirements. (orig./HP)

  8. Special features of total knee replacement in hemophilia.

    Science.gov (United States)

    Rodriguez-Merchan, Emerito Carlos

    2013-12-01

    Total knee replacement is an operation frequently needed by hemophilia patients, which greatly improves their quality of life. This operation, however, carries a higher risk of bleeding and infection for hemophiliacs than it does for osteoarthritis sufferers. It is advisable to implant prosthetic components using antibiotic-loaded cement. It is essential to maintain a level of 100% of the replacement clotting factor for 2 weeks. Hematological treatment must be established, depending on the patient's factor levels and other pharmacokinetic parameters such as recovery and half-life, optimal doses and treatment time. It is preferable to use general anesthesia due to the risk of spinal bleeding. The lifespan of total knee replacement in hemophilic patients is shorter than in patients with osteoarthritis because of the increased risk of infection.

  9. Installation technology of reactor internals on shroud replacement work

    International Nuclear Information System (INIS)

    Miyano, Hiroshi

    1999-01-01

    Since the replacement of large welded reactor internals much as a core shroud did not have a precedent in the world, quite a few technologies had to be developed. Especially for the installation of new core shroud, jet pumps, core plate and top guide, the accurate weld and fit-up techniques for large structures was required to secure their integrity. The vessel shielding system was utilized to reduce general area dose rate such that all replacement work. For jet pump installation, automatic remote welding machines were used for high radiation area. As for the core shroud, shroud support weld prep machining tool with high accuracy, jacking system to support fit-up, new weld machine for small work space and low heat input weld joint were developed. Shroud replacement work in Fukushima Dai-ichi NPS Unit 3 (1F-3) with application of these development techniques, was successfully accomplished. The technology is applied for 1F-2 replacement work also. (author)

  10. Replacement model of city bus: A dynamic programming approach

    Science.gov (United States)

    Arifin, Dadang; Yusuf, Edhi

    2017-06-01

    This paper aims to develop a replacement model of city bus vehicles operated in Bandung City. This study is driven from real cases encountered by the Damri Company in the efforts to improve services to the public. The replacement model propounds two policy alternatives: First, to maintain or keep the vehicles, and second is to replace them with new ones taking into account operating costs, revenue, salvage value, and acquisition cost of a new vehicle. A deterministic dynamic programming approach is used to solve the model. The optimization process was heuristically executed using empirical data of Perum Damri. The output of the model is to determine the replacement schedule and the best policy if the vehicle has passed the economic life. Based on the results, the technical life of the bus is approximately 20 years old, while the economic life is an average of 9 (nine) years. It means that after the bus is operated for 9 (nine) years, managers should consider the policy of rejuvenation.

  11. [Effects of growth hormone replacement therapy on bone metabolism].

    Science.gov (United States)

    Yamamoto, Masahiro; Sugimoto, Toshitsugu

    2014-06-01

    Growth hormone (GH) as well as insulin like growth factor-1 (IGF-1) are essential hormones to maintain homeostasis of bone turnover by activating osteoblastogenesis and osteoclastogenesis. Results from GH replacement therapy for primary osteoporosis and adult-onset GH deficiency (AGHD) suggest that one year or more treatment period by this agent is required to gain bone mineral density (BMD) over the basal level after compensating BMD loss caused by dominant increase in bone resorption which was observed at early phase of GH treatment. A recent meta-analysis demonstrates the efficacy of GH replacement therapy on increases in BMD in male patients with AGHD. Additional analyses are needed to draw firm conclusions in female patients with AGHD, because insufficient amounts of GH might be administrated to them without considerations of influence of estrogen replacement therapy on IGF-1 production. Further observational studies are needed to clarify whether GH replacement therapy prevent fracture risk in these patients.

  12. Fuzzy logic application for extruders replacement problem

    Directory of Open Access Journals (Sweden)

    Edison Conde Perez dos Santos

    2017-03-01

    Full Text Available In a scenario of uncertainty and imprecision, before taking the replacement analysis, a manager needs to consider the uncertain reality of a problem. In this scenario, the fuzzy logic makes an excellent option. Therefore, it is necessary to make a decision based on the fuzzy model. This study is based on the comparison of two methodologies used in the problem of asset replacement. The study, thus, was based on a comparison between two extruders for polypropylene yarn bibliopegy, comparing mainly the costs involved in maintaining the equipment.

  13. Radiological evaluation of failed total hip replacement

    International Nuclear Information System (INIS)

    Raspa, V.; Aldrovandi, S.; Pompei, G.

    1988-01-01

    The retrospective study of 50 operated cases of cemented total hip replacement and a review of the literature enabled the authors to define the radiological features of the above-mentioned condition. These features include one or more of the following signs: calcar reabsorption, lacunar erosions, modified relatioships between the prosthesis components, sepsis and loosening, periarticular calcifications dislocation and fracture of prosthesis components. Careful evaluation of these radiological features is extremely important for both an early diagnosis of failed total hip replacement and the choice of an adequate surgical treatment

  14. Generator replacement is associated with an increased rate of ICD lead alerts.

    Science.gov (United States)

    Lovelock, Joshua D; Cruz, Cesar; Hoskins, Michael H; Jones, Paul; El-Chami, Mikhael F; Lloyd, Michael S; Leon, Angel; DeLurgio, David B; Langberg, Jonathan J

    2014-10-01

    Lead malfunction is an important cause of morbidity and mortality in patients with an implantable cardioverter-defibrillator (ICD). We have shown that the failure of recalled high-voltage leads significantly increases after ICD generator replacement. However, generator replacement has not been recognized as a predictor of lead failure in general. The purpose of this study is to assess the effect of ICD generator exchange on the rate of ICD lead alerts. A time-dependent Cox proportional hazards model was used to analyze a database of remotely monitored ICDs. The model assessed the impact of generator exchange on the rate of lead alerts after ICD generator replacement. The analysis included 60,219 patients followed for 37 ± 19 months. The 5-year lead survival was 99.3% (95% confidence interval 99.2%-99.4%). Of 60,219 patients, 7458 patients (12.9%) underwent ICD generator exchange without lead replacement. After generator replacement, the rate of lead alerts was more than 5-fold higher than in controls with leads of the same age without generator replacement (hazard ratio 5.19; 95% confidence interval 3.45-7.84). A large number of lead alerted within 3 months of generator replacement. Lead alerts were more common in patients with single- vs dual-chamber ICDs and in younger patients. Sex was not associated with lead alerts. Routine generator replacement is associated with a 5-fold higher risk of lead alert compared to age-matched leads without generator replacement. This suggests the need for intense surveillance after generator replacement and the development of techniques to minimize the risk of lead damage during generator replacement. Copyright © 2014 Heart Rhythm Society. Published by Elsevier Inc. All rights reserved.

  15. Tektite 2 habitability research program: Day-to-day life in the habitat

    Science.gov (United States)

    Nowlis, D. P.

    1972-01-01

    Because it is widely agreed that the field of environmental psychology is quite young, it was determined that a sample of recorded observations from a representative mission should be included in the report on Tektite to give the professional reader a better feeling of normal day-to-day life in the isolated habitat. Names of the crew members have been replaced with numbers and some off-color words have been replaced by more acceptable slang; some remarks have been omitted that might lead to easy identification of the subjects. Otherwise, the following pages are exactly as transcribed during the late afternoons and the evenings of the mission.

  16. Replacement of the complete control system of the NPP Oskarshamn 1 by digital distributed control system

    International Nuclear Information System (INIS)

    Berger, E.

    1998-01-01

    As part of an ongoing modernization program, Oskarshamn 1's I and C system and control room will be upgraded by ABB using its Advant Power range of digital, programmable process control system. Besides ensuring the higher level of safety that is demanded today, the new equipment provides the plant with an integrated system which will improve operator overview of operation and reduce risk of human error and serve as a platform for further improvements of the control room. This paper discusses in the example of Oskarshamn 1 how the complete control system of a nuclear power plant may be exchanged, the technical solution and the time schedule. Oskarshamn 1 is the first nuclear power plant in Sweden. It is a boiling water reactor built by ABB ATOM in Sweden between 1966 and 1971. According to this age the control system is semiconductor based and the reactor protection system is relays based. This makes the maintenance expensive and extensions nearly impossible. To extend the life period of this plant the owner has decided to improve the safety system and to replace the reactor protection system and safety related control and the non safety related control by a state of the art digital distributed control system of ABB. In March 1997 ABB got the order to replace the reactor protection system, the safety control system, to start the replacement of all control systems and to replace the old control room by a new ergonomically designed control room. Together with the exchange of the control system an enhancement of the safety system and of the emergency power supply will be implemented

  17. Quantitative replacement of soybean meal with toasted African yam ...

    African Journals Online (AJOL)

    From the result, one can conclude that 25% AYB (treatment II) compared favourably with the control diets 0% AYB in starter broiler diets and is hereby recommended as optimal for quantitative replacement of soybean in broiler starter diet. Key words: Broiler Starter diet, African Yam Bean, Soyabean replacement ...

  18. Gait analysis after successful mobile bearing total ankle replacement.

    NARCIS (Netherlands)

    Doets, H.C.; van Middelkoop, M.; Houdijk, J.H.P.; Nelissen, R.G.; Veeger, H.E.J.

    2007-01-01

    Background: The effect of total ankle replacement on gait is not fully known in terms of joint kinematics, ground reaction force, and activity of the muscles of the lower leg. Methods: A comparative gait study was done in 10 patients after uneventful unilateral mobile-bearing total ankle replacement

  19. Remaining lifetime modelling for replacement of power transformer populations

    NARCIS (Netherlands)

    Schijndel, van A.; Wetzer, J.; Wouters, P.A.A.F.

    2008-01-01

    The age of the majority of power transformers applied in the western electricity network varies between 25 and 50 years. Depending on the load history and time of operation, replacement on short term is imminent. A technically sound policy concerning the replacement of these assets must be based on

  20. Advances in Rosetta structure prediction for difficult molecular-replacement problems

    International Nuclear Information System (INIS)

    DiMaio, Frank

    2013-01-01

    Modeling advances using Rosetta structure prediction to aid in solving difficult molecular-replacement problems are discussed. Recent work has shown the effectiveness of structure-prediction methods in solving difficult molecular-replacement problems. The Rosetta protein structure modeling suite can aid in the solution of difficult molecular-replacement problems using templates from 15 to 25% sequence identity; Rosetta refinement guided by noisy density has consistently led to solved structures where other methods fail. In this paper, an overview of the use of Rosetta for these difficult molecular-replacement problems is provided and new modeling developments that further improve model quality are described. Several variations to the method are introduced that significantly reduce the time needed to generate a model and the sampling required to improve the starting template. The improvements are benchmarked on a set of nine difficult cases and it is shown that this improved method obtains consistently better models in less running time. Finally, strategies for best using Rosetta to solve difficult molecular-replacement problems are presented and future directions for the role of structure-prediction methods in crystallography are discussed

  1. A general approach to total repair cost limit replacement policies

    Directory of Open Access Journals (Sweden)

    F. Beichelt

    2014-01-01

    Full Text Available A common replacement policy for technical systems consists in replacing a system by a new one after its economic lifetime, i.e. at that moment when its long-run maintenance cost rate is minimal. However, the strict application of the economic lifetime does not take into account the individual deviations of maintenance cost rates of single systems from the average cost development. Hence, Beichet proposed the total repair cost limit replacement policy: the system is replaced by a new one as soon as its total repair cost reaches or exceeds a given level. He modelled the repair cost development by functions of the Wiener process with drift. Here the same policy is considered under the assumption that the one-dimensional probability distribution of the process describing the repair cost development is given. In the examples analysed, applying the total repair cost limit replacement policy instead of the economic life-time leads to cost savings of between 4% and 30%. Finally, it is illustrated how to include the reliability aspect into the policy.

  2. TOTAL KNEE REPLACEMENT IN PATIENTS WITH BELOW-KNEE AMPUTATION

    Science.gov (United States)

    Karam, Matthew D; Willey, Michael; Shurr, Donald G

    2010-01-01

    Total knee replacement (TKR) is reserved for patients with severe and disabling arthritis that is non-responsive to conservative measures. Based on existing data, total knee replacement is a safe and cost-effective treatment for alleviating pain and improving physical function in patients who do not respond to conservative therapy. Despite the large variation in health status of patients and types of prosthesis implanted, total knee replacement has proven to be a relatively low risk and successful operation. Each year in the United States surgeons perform approximately 300,000 TKR.1 Likewise, lower extremity amputation is commonly performed in the United States with an annual incidence of 110,000 per year.2 Nearly 70% of all lower extremity amputations are performed as the result of chronic vascular disease, followed by trauma (22%), congenital etiology and tumor (4% each).3 Approximately 50% of all lower extremity amputations are performed secondary to complications from Diabetes Mellitus. Norvell et al. demonstrated that patients who have previously undergone transtibial amputation and ambulate with a prosthesis are more likely to develop degenerative joint disease in the con-tralateral extremity than the ipsilateral extremity.4 Further, radiographic changes consistent with osteoporosis have been demonstrated in up to 88% of limbs that have undergone transtibial amputation.8 To our knowledge, there have been only three reported cases of total knee replacement in patients with ipsilateral transtibial amputation.5,7 The purpose of the present study is to review the existing data on total knee replacement in patients who have undergone transtibial amputation. Further we present a patient with a transtibial amputation who underwent contralateral total knee replacement. PMID:21045987

  3. Aortic Root Replacement for Children With Loeys-Dietz Syndrome.

    Science.gov (United States)

    Patel, Nishant D; Alejo, Diane; Crawford, Todd; Hibino, Narutoshi; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2017-05-01

    Loeys-Dietz syndrome (LDS) is an aggressive aortopathy with a proclivity for aortic aneurysm rupture and dissection at smaller diameters than other connective tissue disorders. We reviewed our surgical experience of children with LDS to validate our guidelines for prophylactic aortic root replacement (ARR). We reviewed all children (younger than 18 years) with a diagnosis of LDS who underwent ARR at our institution. The primary endpoint was mortality, and secondary endpoints included complications and the need for further interventions. Thirty-four children with LDS underwent ARR. Mean age at operation was 10 years, and 15 (44%) were female. Mean preoperative root diameter was 4 cm. Three children (9%) had composite ARR with a mechanical prosthesis, and 31 (91%) underwent valve-sparing ARR. Concomitant procedures included arch replacement in 2 (6%), aortic valve repair in 1 (3%), and patent foramen ovale closure in 16 (47%). There was no operative mortality. Two children (6%) required late replacement of the ascending aorta, 5 (15%) required arch replacement, 1 (3%) required mitral valve replacement, and 2 (6%) had coronary button aneurysms/pseudoaneurysms requiring repair. Three children required redo valve-sparing ARR after a Florida sleeve procedure, and 2 had progressive aortic insufficiency requiring aortic valve replacement after a valve-sparing procedure. There were 2 late deaths (6%). These data confirm the aggressive aortopathy of LDS. Valve-sparing ARR should be performed when feasible to avoid the risks of prostheses. Serial imaging of the arterial tree is critical, given the rate of subsequent intervention. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  4. Optimal Replacement and Management Policies for Beef Cows

    OpenAIRE

    W. Marshall Frasier; George H. Pfeiffer

    1994-01-01

    Beef cow replacement studies have not reflected the interaction between herd management and the culling decision. We demonstrate techniques for modeling optimal beef cow replacement intervals and discrete management policies by incorporating the dynamic effects of management on future productivity when biological response is uncertain. Markovian decision analysis is used to identify optimal beef cow management on a ranch typical of the Sandhills region of Nebraska. Issues of breeding season l...

  5. The role of the safety analysis organization in steam generators replacement and reactor vessel head replacement evaluations

    International Nuclear Information System (INIS)

    Choe, Whee G.; Boatwright, W.J.

    2004-01-01

    When a major component in a nuclear power plant is replaced, especially the steam generators, the plant operator is presented a rare opportunity to learn from operating experience and significantly improve the performance, reliability and robustness of the plant. In addition to the use of improved materials, improved design margins can be built into the component specification that can later be used to provide meaningful operating margins. A Safety Analysis organization that is well-integrated with other plant organizations and possesses a detailed knowledge of the plant design and licensing bases can effectively balance the wants and needs of each organization to optimize the benefits realized by the plant as a whole. Knowledge of the assumptions, limitations, and available margins, both analytical and operating, can be used to specify a replacement steam generator design that optimizes costs and operating improvements. The work scope required to support the new design can be controlled through carefully selected and evaluated restrictions in operations, development of alternate operating strategies, and imposition of appropriate limitations. The important point is that the effective Safety Analysis organization must possess both the breadth and depth of knowledge of the plant design and operations and proactively use this information to support the replacement steam generator project. (author)

  6. Comparing replacement rates under private and federal retirement systems.

    Science.gov (United States)

    Martin, Patricia P

    One measure of the adequacy of retirement income is replacement rate - the percentage of pre-retirement salary that is available to a worker in retirement. This article compares salary replacement rates for private-sector employees of medium and large private establishments with those for federal employees under the Civil Service Retirement System and the Federal Employees Retirement System. Because there is no standard benefit formula to represent the variety of formulas available in the private sector, a composite defined benefit formula was developed using the characteristics of plans summarized in the Bureau of Labor Statistics Medium and Large Employer Plan Survey. The resulting "typical" private-sector defined benefit plan, with an accompanying defined contribution plan, was then compared with the two federal systems. The Civil Service Retirement System (CSRS) is a stand-alone defined benefit plan whose participants are not covered by Social Security. Until passage of the 1983 Amendments to Social Security Act, it was the only retirement plan for most federal civilian employees. Provisions of the 1983 Amendments were designed to restore long-term financial stability to the Social Security trust funds. One provision created the Federal Employees Retirement System (FERS), which covers federal employees hired after 1983. It was one of the provisions designed to restore long-term financial stability to the Social Security trust funds. FERS employees contribute to and are covered by Social Security. FERS, which is a defined benefit plan, also includes a basic benefit and a 401(k)-type plan known as the Thrift Savings Plan (TSP). To compare how retirees would fare under the three different retirement systems, benefits of employees retiring at age 65 with 35 years of service were calculated using hypothetical workers with steady earnings. Workers were classified according to a percentage of the average wage in the economy: low earners (45 percent), average earners

  7. [Valve-sparing Replacement in Patients with Aortic Root Dilatation].

    Science.gov (United States)

    Yamazaki, Kazuhiro; Minatoya, Kenji; Ueda, Ryoma; Takehara, Masato; Sakamoto, Kazuhisa; Ide, Yujiro; Kanemitsu, Hideo; Ueyama, Koji; Ikeda, Tadashi

    2018-01-01

    Valve-sparing root replacement is increasingly used to overcome drawbacks associated with valvular prostheses. In our institution, 7 patients underwent valve-sparing root replacement from August 2016 to July 2017. The mean age was 45 years (range, 14~69 years). Three patients had Marfan syndrome and 1 had Loeys-Dietz syndrome with acute aortic dissection. All patients underwent surgery with reimplantation technique using a Valsalva graft. Two patients required repair of aortic valve leaflet prolapse. All patients had an excellent clinical course, with mild or no aortic regurgitation and a decrease in end-diastolic volume on echocardiography. These results support the continued use of valve-sparing root replacement in selected patients.

  8. Renal replacement lipomatosis: multidetector-row computed tomography findings in one case

    International Nuclear Information System (INIS)

    Calisir, C.; Can, C.; Kebapci, M.

    2007-01-01

    Replacement lipomatosis of the kidney is the result of severe atrophy of the renal parenchyma often caused by chronic calculus disease with secondary marked benign proliferation of fibrofatty tissue replacing atrophied renal parenchyma. Different radiological modalities have been used to illustrate this entity, with magnetic resonance imaging, ultrasound, intravenous pyelogram, and computed tomography (CT) used most frequently. We report multidedector CT (MDCT) findings of replacement lipomatosis in a 50-year-old woman. We think that it accurately provides a complete one-step diagnostic workup and appropriate pre-surgical planning for patients for whom there is a suspicion of replacement lipomatosis

  9. Risks and benefits of citrate anticoagulation for continuous renal replacement therapy.

    Science.gov (United States)

    Shum, H P; Yan, W W; Chan, T M

    2015-04-01

    Heparin, despite its significant side-effects, is the most commonly used anticoagulant for continuous renal replacement therapy in critical care setting. In recent years, citrate has gained much popularity by improving continuous renal replacement therapy circuit survival and decreasing blood transfusion requirements. However, its complex metabolic consequences warrant modification in the design of the citrate-based continuous renal replacement therapy protocol. With thorough understanding of the therapeutic mechanism of citrate, a simple and practicable protocol can be devised. Citrate-based continuous renal replacement therapy can be safely and widely used in the clinical setting with appropriate clinical staff training.

  10. Factors influencing health-related quality of life after total hip replacement - a comparison of data from the Swedish and Danish hip arthroplasty registers

    DEFF Research Database (Denmark)

    Gordon, Max; Paulsen, Aksel; Overgaard, Søren

    2013-01-01

    of PROs may present difficulties due to cultural differences and differences in the provision of health care. However, in order to understand how these differences affect PROs, common predictors for poor and good outcomes need to be investigated. This cross-sectional study investigates factors influencing......There is an increasing focus on measuring patient-reported outcomes (PROs) as part of routine medical practice, particularly in fields such as joint replacement surgery where pain relief and improvement in health-related quality of life (HRQoL) are primary outcomes. Between-country comparisons...... health-related quality of life (HRQoL) one year after total hip replacement (THR) surgery in Sweden and in Denmark....

  11. The household decision making process in replacement of durable goods

    OpenAIRE

    Marell Molander, Agneta

    1998-01-01

    As durables are essential in many households, the level of ownership is high and, due to the high degree of penetration, a vast proportion of the current sales are replacement purchases. Even though a lot of research attention has been paid to decision making and decision processes many models are oriented towards non-durable goods and although a majority of purchases of many durable goods are replacements, few studies seem to make a distinction between a replacement purchase decision and a d...

  12. Mathematical modelling long-term effects of replacing Prevnar7 with Prevnar13 on invasive pneumococcal diseases in England and Wales.

    Directory of Open Access Journals (Sweden)

    Yoon Hong Choi

    Full Text Available England and Wales recently replaced the 7-valent pneumococcal conjugate vaccine (PCV7 with its 13-valent equivalent (PCV13, partly based on projections from mathematical models of the long-term impact of such a switch compared to ceasing pneumococcal conjugate vaccination altogether.A compartmental deterministic model was used to estimate parameters governing transmission of infection and competition between different groups of pneumococcal serotypes prior to the introduction of PCV13. The best-fitting parameters were used in an individual based model to describe pneumococcal transmission dynamics and effects of various options for the vaccination programme change in England and Wales. A number of scenarios were conducted using (i different assumptions about the number of invasive pneumococcal disease cases adjusted for the increasing trend in disease incidence prior to PCV7 introduction in England and Wales, and (ii a range of values representing serotype replacement induced by vaccination of the additional six serotypes in PCV13.Most of the scenarios considered suggest that ceasing pneumococcal conjugate vaccine use would cause an increase in invasive pneumococcal disease incidence, while replacing PCV7 with PCV13 would cause an overall decrease. However, the size of this reduction largely depends on the level of competition induced by the additional serotypes in PCV13. The model estimates that over 20 years of PCV13 vaccination, around 5000-62000 IPD cases could be prevented compared to stopping pneumococcal conjugate vaccination altogether.Despite inevitable uncertainty around serotype replacement effects following introduction of PCV13, the model suggests a reduction in overall invasive pneumococcal disease incidence in all cases. Our results provide useful evidence on the benefits of PCV13 to countries replacing or considering replacing PCV7 with PCV13, as well as data that can be used to evaluate the cost-effectiveness of such a switch.

  13. The effect of growth hormone replacement on the thyroid axis in patients with hypopituitarism: in vivo and ex vivo studies.

    Science.gov (United States)

    Glynn, Nigel; Kenny, Helena; Quisenberry, Leah; Halsall, David J; Cook, Paul; Kyaw Tun, Tommy; McDermott, John H; Smith, Diarmuid; Thompson, Christopher J; O'Gorman, Donal J; Boelen, Anita; Lado-Abeal, Joaquin; Agha, Amar

    2017-05-01

    Alterations in the hypothalamic-pituitary-thyroid axis have been reported following growth hormone (GH) replacement. The aim was to examine the relationship between changes in serum concentration of thyroid hormones and deiodinase activity in subcutaneous adipose tissue, before and after GH replacement. A prospective, observational study of patients receiving GH replacement as part of routine clinical care. Twenty adult hypopituitary men. Serum TSH, thyroid hormones - free and total thyroxine (T4) and triiodothyronine (T3) and reverse T3, thyroglobulin and thyroid-binding globulin (TBG) levels were measured before and after GH substitution. Changes in serum hormone levels were compared to the activity of deiodinase isoenzymes (DIO1, DIO2 and DIO3) in subcutaneous adipose tissue. The mean daily dose of growth hormone (GH) was 0·34 ± 0·11 mg (range 0·15-0·5 mg). Following GH replacement, mean free T4 levels declined (-1·09 ± 1·99 pmol/l, P = 0·02). Reverse T3 levels also fell (-3·44 ± 1·42 ng/dl, P = 0·03) and free T3 levels increased significantly (+0·34 ± 0·15 pmol/l, P = 0·03). In subcutaneous fat, DIO2 enzyme activity declined; DIO1 and DIO3 activities remained unchanged following GH substitution. Serum TSH, thyroglobulin and TBG levels were unaltered by GH therapy. In vitro analysis of subcutaneous adipose tissue from hypopituitary human subjects demonstrates that GH replacement is associated with significant changes in deiodinase isoenzyme activity. However, the observed variation in enzyme activity does not explain the changes in the circulating concentration of thyroid hormones induced by GH replacement. It is possible that deiodinase isoenzymes are differentially regulated by GH in other tissues including liver and muscle. © 2016 John Wiley & Sons Ltd.

  14. Potentiality Prediction of Electric Power Replacement Based on Power Market Development Strategy

    Science.gov (United States)

    Miao, Bo; Yang, Shuo; Liu, Qiang; Lin, Jingyi; Zhao, Le; Liu, Chang; Li, Bin

    2017-05-01

    The application of electric power replacement plays an important role in promoting the development of energy conservation and emission reduction in our country. To exploit the potentiality of regional electric power replacement, the regional GDP (gross domestic product) and energy consumption are taken as potentiality evaluation indicators. The principal component factors are extracted with PCA (principal component analysis), and the integral potentiality analysis is made to the potentiality of electric power replacement in the national various regions; a region is taken as a research object, and the potentiality of electric power replacement is defined and quantified. The analytical model for the potentiality of multi-scenario electric power replacement is developed, and prediction is made to the energy consumption with the grey prediction model. The relevant theoretical research is utilized to realize prediction analysis on the potentiality amount of multi-scenario electric power replacement.

  15. Replacement Condition Detection of Railway Point Machines Using an Electric Current Sensor

    Science.gov (United States)

    Sa, Jaewon; Choi, Younchang; Chung, Yongwha; Kim, Hee-Young; Park, Daihee; Yoon, Sukhan

    2017-01-01

    Detecting replacement conditions of railway point machines is important to simultaneously satisfy the budget-limit and train-safety requirements. In this study, we consider classification of the subtle differences in the aging effect—using electric current shape analysis—for the purpose of replacement condition detection of railway point machines. After analyzing the shapes of after-replacement data and then labeling the shapes of each before-replacement data, we can derive the criteria that can handle the subtle differences between “does-not-need-to-be-replaced” and “needs-to-be-replaced” shapes. On the basis of the experimental results with in-field replacement data, we confirmed that the proposed method could detect the replacement conditions with acceptable accuracy, as well as provide visual interpretability of the criteria used for the time-series classification. PMID:28146057

  16. Utilization of mine tailings as partial cement replacement

    DEFF Research Database (Denmark)

    Sigvardsen, Nina Marie; Nielsen, M.R.; Ottosen, Lisbeth M.

    2017-01-01

    Depositing mine tailings entail major economic costs and negative environmental impacts. Thus finding an alternative to depositing is of interest. This study focused on the use of mine tailings as partial cement replacement, thereby preventing depositing the mine tailings. At the same time......, such use would reduce the CO2 emission related to the production of cement. Mine tailings from two different mines Zinkgruvan (Sweden) and Nalunaq (Greenland) were both tested as 5 and 10 % cement replacement. All mortar specimens with mine tailings had lower compressive strength compared to a reference...... compared to a specimen containing a 10 % replacement of cement with coal fly ash, commonly used in Denmark. The compressive strength of specimens containing mine tailings exceeded the compressive strength of the specimen containing coal fly ash, indicating further the amorphous content of volcanic decent...

  17. Replacement of benthic communities in two Neoproterozoic-Cambrian subtropical-to-temperate rift basins, High Atlas and Anti-Atlas, Morocco

    Science.gov (United States)

    Clausen, Sébastien; Álvaro, J. Javier; Zamora, Samuel

    2014-10-01

    The ‘Cambrian explosion’ is often introduced as a major shift in benthic marine communities with a coeval decline of microbial consortia related to the diversification of metazoans and development of bioturbation (‘Agronomic Revolution’). Successive community replacements have been reported along with ecosystem diversification and increase in guild complexity from Neoproterozoic to Cambrian times. This process is recorded worldwide but with regional diachroneities, some of them directly controlled by the geodynamic conditions of sedimentary basins. The southern High Atlas and Anti-Atlas of Morocco record development of two rifts, Tonian (?) - early Cryogenian and latest Ediacarian-Cambrian in age, separated by the onset of the Pan-African Orogeny. This tectonically controlled, regional geodynamic change played a primary control on pattern and timing of benthic ecosystem replacements. Benthic communities include microbial consortia, archaeocyathan-thromboid reefal complexes, chancelloriid-echinoderm-sponge meadows, and deeper offshore echinoderm-dominated communities. Microbial consortia appeared in deeper parts of the Tonian (?) - early Cryogenian fluvio-deltaic progradational rift sequences, lacustrine environments of the Ediacaran Volcanic Atlasic Chain (Ouarzazate Supergroup) and the Ediacaran-Cambrian boundary interval, characterized by the peritidal-dominated Tifnout Member (Adoudou Formation). They persisted and were largely significant until Cambrian Age 3, as previous restricted marine conditions precluded the immigration of shelly metazoans in the relatively shallow epeiric parts of the Cambrian Atlas Rift. Successive Cambrian benthic communities were replaced as a result of distinct hydrodynamic and substrate conditions, which allow identification of biotic (e.g., antagonistic relationships between microbial consortia and echinoderms, and taphonomic feedback patterns in chancelloriid-echinoderm-sponge meadows) and abiotic (e.g., rifting

  18. Psychosocial determinants of outcomes in knee replacement.

    Science.gov (United States)

    Lopez-Olivo, Maria A; Landon, Glenn C; Siff, Sherwin J; Edelstein, David; Pak, Chong; Kallen, Michael A; Stanley, Melinda; Zhang, Hong; Robinson, Kausha C; Suarez-Almazor, Maria E

    2011-10-01

    To identify potential psychosocial and educational barriers to clinical success following knee replacement. The authors evaluated 241 patients undergoing total knee replacement, preoperatively and 6 months after surgery. Outcomes included the Western Ontario McMaster (WOMAC) scale and the Knee Society rating system (KSRS). Independent variables included: the medical outcome study-social support scale; depression, anxiety and stress scale; brief COPE inventory; health locus of control; arthritis self-efficacy scale and the life orientation test-revised. Multiple regression models evaluated associations of baseline demographic and psychosocial variables with outcomes at 6 months, controlling for body mass index, comorbidities and baseline outcome scores. Patients' mean age was 65 ± 9 years; 65% were women. Most patients improved outcomes after surgery. Several psychosocial variables were associated with outcomes. Regression analyses indicated lower education, less tangible support, depression, less problem-solving coping, more dysfunctional coping, lower internal locus of control were associated with worse WOMAC scores (R(2) contribution of psychosocial variables for pain 0.07; for function, 0.14). Older age, lower education, depression and less problem-solving coping were associated with poorer total KSRS scores (R(2) contribution of psychosocial variables to total KSRS model 0.09). Psychosocial variables as a set contributed from 25% to 74% of total explained variance across the models tested. Patients' level of education, tangible support, depression, problem-solving coping, dysfunctional coping and internal locus of control were associated with pain and functional outcomes after knee replacement. The findings suggest that, in addition to medical management, perioperative psychosocial evaluation and intervention are crucial in enhancing knee replacement outcomes.

  19. Performance of concrete with partial replacement of fine aggregates ...

    African Journals Online (AJOL)

    The study investigated the level of replacement of fine aggregate with waste glass that will result in optimal compressive strength. A total of 36 cubes were cast. 6 cubes without waste glass (control) and 30 cubes containing waste glass as partial replacement for fine aggregates at 15%, 25%, 35%, 45%, and 50%.

  20. Gentilly 2 divider plate replacement

    International Nuclear Information System (INIS)

    Forest, J.; Klisel, E.; McClellan, G.; Schnelder, W.

    1995-01-01

    The steam generators at the Gentilly 2 Nuclear Plant in operation since 1983 were built with primary divider plates of a bolted panel configuration. During a routine outage inspection, it was noted that two bolts had dislodged from the divider and were located lying in the primary head. Subsequent inspections revealed erosion damage to a substantial number of divider plate bolts and to a lesser extent, to the divider plate itself. After further inspection and repair the units were returned to operation, however, it was determined that a permanent replacement of the primary divider plates was going to be necessary. After evaluation of various options, it was decided that the panel type dividers would be replaced with a single piece floating design. The divider itself was to be of a one piece all-welded arrangement to be constructed from individual panels to be brought in through the manways. In view of the strength limitations of the bolted attachment of the upper seat bar to the tubesheet, a new welded seat bar was provided. To counteract erosion concerns, the new divider is fitted with erosion resistant inserts or weld buildup and with improved sealing features in order to minimize leakage and erosion. At an advanced stage in the design and manufacture of the components, the issue of divider strength during LOCA conditions came into focus. Analysis was performed to determine the strength and/or failure characteristics of the divider to a variety of small and large LOCA conditions. The paper describes the diagnosis of the original divider plates and the design, manufacture, field mobilization, installation and subsequent operation of the replacement divider plates. (author)