WorldWideScience

Sample records for replacement warhead rrw

  1. RRW: repeated random walks on genome-scale protein networks for local cluster discovery

    Directory of Open Access Journals (Sweden)

    Can Tolga

    2009-09-01

    Full Text Available Abstract Background We propose an efficient and biologically sensitive algorithm based on repeated random walks (RRW for discovering functional modules, e.g., complexes and pathways, within large-scale protein networks. Compared to existing cluster identification techniques, RRW implicitly makes use of network topology, edge weights, and long range interactions between proteins. Results We apply the proposed technique on a functional network of yeast genes and accurately identify statistically significant clusters of proteins. We validate the biological significance of the results using known complexes in the MIPS complex catalogue database and well-characterized biological processes. We find that 90% of the created clusters have the majority of their catalogued proteins belonging to the same MIPS complex, and about 80% have the majority of their proteins involved in the same biological process. We compare our method to various other clustering techniques, such as the Markov Clustering Algorithm (MCL, and find a significant improvement in the RRW clusters' precision and accuracy values. Conclusion RRW, which is a technique that exploits the topology of the network, is more precise and robust in finding local clusters. In addition, it has the added flexibility of being able to find multi-functional proteins by allowing overlapping clusters.

  2. Transparency in nuclear warhead dismantlement -- Limited chain of custody and warhead signatures

    International Nuclear Information System (INIS)

    Kiernan, G.; Percival, M.; Bratcher, L.

    1996-01-01

    The goal of the US Safeguards, Transparency, and Irreversibility (STI) initiative is the development of a series of transparency measures that provide confidence that nuclear warheads are actually being dismantled and that the fissile material being removed from these dismantled weapons is not recycled into new production. A limited chain of custody (LCC) would follow a warhead from the time it is declared excess until it is actually dismantled and the fissile materials are stored. Measurement of warhead signatures is an option in LCC using radiation detection techniques to confirm that a warhead has been dismantled, without intrusive inspections within the dismantlement facility. This paper discusses LCC and warhead signatures as well as indicate first results of laboratory measurements related to warhead signatures

  3. Nuclear Weapons Enterprise Transformation - A Sustainable Approach

    International Nuclear Information System (INIS)

    O'Brien, K H

    2005-01-01

    with an improved vision of the future stockpile and enterprise, and find a path that moves us toward that future. The goal of this approach is to achieve a more affordable, sustainable, and responsive enterprise. In order to transform the enterprise in this way, the SSP warhead designs that drive the enterprise must change. Designs that emphasize manufacturability, certifiability, and increased safety and security can enable enterprise transformation. It is anticipated that such warheads can be certified and sustained with high confidence without nuclear testing. The SSP provides the tools to provide such designs, and can develop replacement designs and produce them for the stockpile. The Cold War currency of optimizing warhead yield-to-weight can be replaced by SSP designs optimizing margin-to-uncertainty. The immediate challenge facing the nuclear weapons enterprise is to find a credible path that leads to this vision of the future stockpile and enterprise. Reliable warheads within a sustainable enterprise can best be achieved by shifting from a program of legacy-warhead refurbishment to one of warhead replacement. The nuclear weapons stockpile and the nuclear weapons enterprise must transform together to achieve this vision. The current Reliable Replacement Warhead (RRW) program represents an approach that can begin this process of transformation. If the RRW program succeeds, the designs, manufacturing complex, and certification strategy can evolve together and in so doing come up with a more cost-efficient solution that meets today's and tomorrow's national security requirements

  4. Warheads and Fissile Materials:Declarations and Counting

    International Nuclear Information System (INIS)

    Sutcliffe, W.G.

    1991-01-01

    This paper reviews some of the issues about verifying the dismantlement of nuclear warheads and controlling nuclear materials in the context of arms control objectives. It is asserted that information about the stockpiles of nuclear warheads and materials is necessary to analyze the impacts and verification requirements of arms control measures including warhead dismantlement and fissile material controls. It is proposed that the US and the Soviets engage in a series of declarations about their stockpiles of nuclear weapons and materials. It is also asserted that currently it is more important to verify that warheads are retired to safe, secure facilities than to verify their dismantlement. It is proposed that production of new or rebuilt warheads be limited to less than the number retired each year. Verifying the number of new and rebuilt warheads deployed and the number retired avoids many of the difficulties in verifying dismantlement and material controls

  5. Measurement approaches to support future warhead arms control transparency

    International Nuclear Information System (INIS)

    Olinger, C.T.; Frankle, C.M.; Johnson, M.W.; Poths, J.

    1998-01-01

    Transparency on warhead stockpiles, warhead dismantlement, and fissile material stockpiles in nuclear weapons states will become increasingly important in the move beyond START II toward lower quantities of warheads. Congressional support for further warhead reductions will likely depend on the degree of irreversibility, or in other words, the rapidity with which warhead inventories could be reconstituted. Whether irreversibility considerations can be satisfied will depend on monitoring dismantlement as well as constraining the available stockpile of fissile materials for possible refabrication into warheads. Measurement techniques designed to address the above problems will need to consider NPT Article 1 obligations as well as Russian and US classification regulations, which prohibit or restrict the transfer of nuclear warhead design information to other states. Classification considerations currently limit the potential completeness of future inspections of weapons materials. Many conventional international safeguards approaches are not currently viable for arms control applications because they would reveal weapons design information. The authors discuss a variety of technical measures that may help to improve transparence of warhead and fissile material stockpiles and may enable limited warhead dismantlement transparency

  6. Warhead and fissile-material declarations

    International Nuclear Information System (INIS)

    von Hippel, F.

    1992-01-01

    Until recently, arms control agreements were limited by the fact that the only available verification capabilities were national technical means, which involved instruments in space or beyond national borders. As a result, the SALT II treaty constrained only the construction of large missile silos, ballistic-missile submarines and long-range bombers - and limited the flight testing of long-range ballistic missiles. Recently, however, on-site verification has been accepted, making it possible in the INF treaty to extend controls to small mobile missiles and their launchers. This paper therefore outlines a comprehensive system of verifiable limits on nuclear warheads. The authors discuss in some detail the verifiability of a halt in the production of fissile materials for nuclear warheads, the verifiability of declarations of the amounts of fissile material produced for warheads prior to the production cutoff, and the establishment of a verifiable accounting system for the numbers and types of nuclear warheads possessed by each side

  7. Accident-resistant container: safety for warhead transport. Executive summary

    International Nuclear Information System (INIS)

    Berry, R.E.

    1975-11-01

    Development testing of model and full-scale hardware to the abnormal environments created during a cargo aircraft crash has demonstrated that the accident-resistant container (ARC) can protect an enclosed warhead from these abnormal environments. This protection reduces the probability of initiation of the warhead HE. Transfer of the plutonium limit to the ARC may permit transporting increased numbers of warheads on a single transport vehicle. Testing of one warhead configuration has been completed. Production can be initiated for transporting that system in the ARC. Other systems need test evaluation and certification before being transported in the ARC

  8. Warhead Monitoring Planning and Execution

    Energy Technology Data Exchange (ETDEWEB)

    Nakae, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-12-05

    The Warhead Measurement Campaign is a multi-laboratory project lead by the Los Alamos National Laboratory. The project will measure several items of the US nuclear weapons stockpile with a wide range of radiation detection systems. This report provides a brief summary of those LLNL executed activities for the Warhead Measurement Campaign from FY11 through FY16. A more detailed description of all of LLNL’s activiites for the WMC will be presented in the final report of a follow-on project, , LA17-V-Wx.

  9. Flying Posture of Tandem Warhead Influences its Penetrating and Following Performance

    Directory of Open Access Journals (Sweden)

    Jin-tao Wang

    2014-02-01

    Full Text Available In this study, we investigated a novel monolithic tandem penetrating-blast warhead, which can destroy targets with adjustable parameters including attack velocity, angles, as well as yaw angles. Different flying postures determine different performance of the precursory EFP in penetration process and its following projectile in secondary process. In order to characterize the influence of flying posture, we established a finite elements analysis model. This model has been verified by a static experiment. Our results indicated that the attack velocity of the warhead has tiny influence of the penetration process. However, larger attack angle of the warhead will lead to bad performance of the warhead. Meanwhile, yaw angle range should be controlled in small values due to its randomness. The comprehensive properties of the tandem warhead meet the design requirement, and it is able to damage the target effectively.

  10. Split warhead simultaneous impact

    Directory of Open Access Journals (Sweden)

    Rahul Singh Dhari

    2017-12-01

    Full Text Available A projectile system is proposed to improve efficiency and effectiveness of damage done by anti-tank weapon system on its target by designing a ballistic projectile that can split into multiple warheads and engage a target at the same time. This idea has been developed in interest of saving time consumed from the process of reloading and additional number of rounds wasted on target during an attack. The proposed system is achieved in three steps: Firstly, a mathematical model is prepared using the basic equations of motion. Second, An Ejection Mechanism of proposed warhead is explained with the help of schematics. Third, a part of numerical simulation which is done using the MATLAB software. The final result shows various ranges and times when split can be effectively achieved. With the new system, impact points are increased and hence it has a better probability of hitting a target.

  11. Just what exactly is a warhead? An analysis of Russian/English translations and definitions

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, A.

    1998-06-01

    That there are significant definitional differences between languages is a statement of the obvious. It logically follows that definitional ambiguity occurs when translating a term from one language to another. The far-reaching implications of this fact, however, are not as widely recognized. One word that has been and will continue to be significant is warhead. This analysis (1) examines the different translations and definitions of the word warhead in English and Russian; (2) discusses the usage of warhead in the context of arms control; and (3) explores the implications definitional differences have for future negotiations. It specifically utilizes treaty texts, as well as the Helsinki agreement text, to construct a contextual use of warhead. It is concluded that if US policymakers are committed to including nuclear explosive devices in START III force reductions, negotiators must identify and use a more specific term than warhead or boyegolovka. Also included as an appendix are copies of the signed Helsinki agreement in both English and Russian.

  12. Just what exactly is a warhead? An analysis of Russian/English translations and definitions

    International Nuclear Information System (INIS)

    Hadley, A.

    1998-06-01

    That there are significant definitional differences between languages is a statement of the obvious. It logically follows that definitional ambiguity occurs when translating a term from one language to another. The far-reaching implications of this fact, however, are not as widely recognized. One word that has been and will continue to be significant is warhead. This analysis (1) examines the different translations and definitions of the word warhead in English and Russian; (2) discusses the usage of warhead in the context of arms control; and (3) explores the implications definitional differences have for future negotiations. It specifically utilizes treaty texts, as well as the Helsinki agreement text, to construct a contextual use of warhead. It is concluded that if US policymakers are committed to including nuclear explosive devices in START III force reductions, negotiators must identify and use a more specific term than warhead or boyegolovka. Also included as an appendix are copies of the signed Helsinki agreement in both English and Russian

  13. Precession feature extraction of ballistic missile warhead with high velocity

    Science.gov (United States)

    Sun, Huixia

    2018-04-01

    This paper establishes the precession model of ballistic missile warhead, and derives the formulas of micro-Doppler frequency induced by the target with precession. In order to obtain micro-Doppler feature of ballistic missile warhead with precession, micro-Doppler bandwidth estimation algorithm, which avoids velocity compensation, is presented based on high-resolution time-frequency transform. The results of computer simulations confirm the effectiveness of the proposed method even with low signal-to-noise ratio.

  14. Reducing neutron multiplicity counting bias for plutonium warhead authentication

    Energy Technology Data Exchange (ETDEWEB)

    Goettsche, Malte

    2015-06-05

    Confidence in future nuclear arms control agreements could be enhanced by direct verification of warheads. It would include warhead authentication. This is the assessment based on measurements whether a declaration that a specific item is a nuclear warhead is true. An information barrier can be used to protect sensitive information during measurements. It could for example show whether attributes such as a fissile mass exceeding a threshold are met without indicating detailed measurement results. Neutron multiplicity measurements would be able to assess a plutonium fissile mass attribute if it were possible to show that their bias is low. Plutonium measurements have been conducted with the He-3 based Passive Scrap Multiplicity Counter. The measurement data has been used as a reference to test the capacity of the Monte Carlo code MCNPX-PoliMi to simulate neutron multiplicity measurements. The simulation results with their uncertainties are in agreement with the experimental results. It is essential to use cross-sections which include neutron scattering with the detector's polyethylene molecular structure. Further MCNPX-PoliMi simulations have been conducted in order to study bias that occurs when measuring samples with large plutonium masses such as warheads. Simulation results of solid and hollow metal spheres up to 6000 g show that the masses are underpredicted by as much as 20%. The main source of this bias has been identified in the false assumption that the neutron multiplication does not depend on the position where a spontaneous fission event occurred. The multiplication refers to the total number of neutrons leaking a sample after a primary spontaneous fission event, taking induced fission into consideration. The correction of the analysis has been derived and implemented in a MATLAB code. It depends on four geometry-dependent correction coefficients. When the sample configuration is fully known, these can be exactly determined and remove this type of

  15. Numerical simulations of semi-armor-piercing warhead penetrating aircraft carrier target

    OpenAIRE

    Dong Sangqaing; Cai Xinghui; Wang Guoliang; Gao Yunliang; Lu Jiangren

    2015-01-01

    FEM models of semi-armor-piercing warhead penetrating aircraft carrier deck are established, which are validated by related experimental data. Base on the models, the process of semi-armor-piercing warhead penetrating aircraft carrier deck with different incidence angles and attack angles are carried out. The results show that incidence angles have no remarkable influence on penetration capability of the projectile under the circumstance of zero attack angle. Ductility reaming damage mode and...

  16. Behavior Characteristics of Type I (75/25) Octol during Melt Pouring HE Warhead M250 (Chaparral)

    Science.gov (United States)

    1979-09-01

    COVERED BEHAVIOR CHARACTERISTICS OF TYPE 1 (75/25) "OCTOL DURING MELT POURING HE WARHEAD I M250 (CHAPARRAL) 6. PERFORMING ORG. APrPORT NUMBER 7. AUTHOR...Military Specification, HMX, MIL-H-45444B, Amendment 2, dated 12 July 1977. 4 6. Military Specification, Warhead, Guided Missile, HE, M250 , Loading...CHARACTERISTICS OF TYPE i (75/25) OCTOL DURING MELT POURING HE WARHEAD M250 (CHAPARRAL) HERMAN J. FRIGAND SEPTEMBER 1979 US ARMY ARMAMENT RESEARCH AND

  17. Concept of Operations for Nuclear Warhead Embedded Sensors

    Energy Technology Data Exchange (ETDEWEB)

    Rockett, P D; Koncher, T R

    2012-05-16

    Embedded arms-control-sensors provide a powerful new paradigm for managing compliance with future nuclear weapons treaties, where deployed warhead numbers will be reduced to 1000 or less. The CONOPS (Concept of Operations) for use with these sensors is a practical tool with which one may help define design parameters, including size, power, resolution, communications, and physical structure. How frequently must data be acquired and must a human be present? Will such data be acquired for only stored weapons or will it be required of deployed weapons as well? Will tactical weapons be subject to such monitoring or will only strategic weapons apply? Which data will be most crucial? Will OSI's be a component of embedded sensor data management or will these sensors stand alone in their data extraction processes? The problem space is massive, but can be constrained by extrapolating to a reasonable future treaty regime and examining the bounded options this scenario poses. Arms control verification sensors, embedded within the warhead case or aeroshell, must provide sufficient but not excessively detailed data, confirming that the item is a nuclear warhead and that it is a particular warhead without revealing sensitive information. Geolocation will be provided by an intermediate transceiver used to acquire the data and to forward the data to a central processing location. Past Chain-of-Custody projects have included such devices and will be primarily responsible for adding such indicators in the future. For the purposes of a treaty regime a TLI will be verified as a nuclear warhead by knowledge of (a) the presence and mass of SNM, (b) the presence of HE, and (c) the reporting of a unique tag ID. All of these parameters can be obtained via neutron correlation measurements, Raman spectroscopy, and fiber optic grating fabrication, respectively. Data from these sensors will be pushed out monthly and acquired nearly daily, providing one of several verification layers in

  18. The Reliable Replacement Warhead Program: Background and Current Developments

    National Research Council Canada - National Science Library

    Medalia, Jonathan

    2008-01-01

    ...), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992...

  19. Experimental Studies on Improved Plastic Bonded Explosives Materials (PBXs for Controlled Fragmentation Warheads

    Directory of Open Access Journals (Sweden)

    Elsharkawy Karim

    2017-01-01

    Full Text Available This paper describes formulations of plastic bonded explosives (PBXs based on three highly brisant explosives, namely 1,3,5-trinitro-1,3,5-triazinane (RDX, 1,3,5,7-tetranitro-1,3,5,7-tetrazocane (HMX and pentaerythritoltetranitrate (PETN with polyurethane (PU based on Glycidyl azide polymer (GAP as an energetic binder in comparison with composition-B, which used in the fragmentation warheads. The sensitivity and performance properties of different types of PBXs were evaluated by experimental results of prepared selected PBX compositions. Casting technique was used to prepare the selected compositions containing 14% PU based on GAP. It has been observed that the brisance of the PBX based on HMX was higher than that of comp-B by 21.3 %, the detonation velocity showed a remarkable increase of the order of 8480 (m/s while that of comp-B was 7638 (m/s. A controlled fragmentation warhead with an outer grooving warhead case of dimensions 100x35x4 mm was used and arena test was carried out to determine the lethal zone of the fragmentation warhead. The lethal zone obtained from arena test for PBX composition based on HMX named PBXHG4 was higher than that based on RDX or PETN, and than that of comp-B by 40%.

  20. Simulation of natural fragmentation of rings cut from warheads

    Directory of Open Access Journals (Sweden)

    John F. Moxnes

    2015-12-01

    Full Text Available Natural fragmentation of warheads that detonates causes the casing of the warhead to split into various sized fragments through shear or radial fractures depending on the toughness, density, and grain size of the material. The best known formula for the prediction of the size distribution is the Mott formulae, which is further examined by Grady and Kipp by investigating more carefully the statistical most random way of portioning a given area into a number of entities. We examine the fragmentation behavior of radially expanding steel rings cut from a 25 mm warhead by using an in house smooth particle hydrodynamic (SPH simulation code called REGULUS. Experimental results were compared with numerical results applying varying particle size and stochastic fracture strain. The numerically obtained number of fragments was consistent with experimental results. Increasing expansion velocity of the rings increases the number of fragments. Statistical variation of the material parameters influences the fragment characteristics, especially for low expansion velocities. A least square regression fit to the cumulative number of fragments by applying a generalized Mott distribution shows that the shape parameter is around 4 for the rings, which is in contrast to the Mott distribution with a shape parameter of ½. For initially polar distributed particles, we see signs of a bimodal cumulative fragment distribution. Adding statistical variation in material parameters of the fracture model causes the velocity numerical solutions to become less sensitive to changes in resolution for Cartesian distributed particles.

  1. The role of inertial containment fusion in replacing nuclear tests

    Energy Technology Data Exchange (ETDEWEB)

    Schaper, Annette [Hessische Stiftung Friedens- und Konfliktforschung, Frankfurt am Main (Germany)

    2008-07-01

    Nuclear weapon physicists need to understand the process of a nuclear explosion, and their major experimental tools had been nuclear tests. Since a couple of years, the established nuclear weapon states observe a testing moratorium. Nevertheless, they still want to keep their nuclear arsenals, and consequently to ensure the reliability, safety, and security of their nuclear warheads. For this purpose, they use experimental tools that replace nuclear tests, among them ICF. ICF plays a central role in the so-called ''stockpile stewardship program'' that the U.S. has implemented when it participated in the negotiations on a Comprehensive Test Ban Treaty. Several questions arise and are discussed in the presentation: Does ICF allow to simulate the extreme conditions of a nuclear explosion? Which are the functions of nuclear testing that ICF can replace and which are beyond its capabilities? Would ICF be a useful tool for the design of new nuclear warheads? Why are so huge sums spent on ICF in a military context although the usefulness for nuclear weapons seems rather limited?.

  2. Warhead verification as inverse problem: Applications of neutron spectrum unfolding from organic-scintillator measurements

    Science.gov (United States)

    Lawrence, Chris C.; Febbraro, Michael; Flaska, Marek; Pozzi, Sara A.; Becchetti, F. D.

    2016-08-01

    Verification of future warhead-dismantlement treaties will require detection of certain warhead attributes without the disclosure of sensitive design information, and this presents an unusual measurement challenge. Neutron spectroscopy—commonly eschewed as an ill-posed inverse problem—may hold special advantages for warhead verification by virtue of its insensitivity to certain neutron-source parameters like plutonium isotopics. In this article, we investigate the usefulness of unfolded neutron spectra obtained from organic-scintillator data for verifying a particular treaty-relevant warhead attribute: the presence of high-explosive and neutron-reflecting materials. Toward this end, several improvements on current unfolding capabilities are demonstrated: deuterated detectors are shown to have superior response-matrix condition to that of standard hydrogen-base scintintillators; a novel data-discretization scheme is proposed which removes important detector nonlinearities; and a technique is described for re-parameterizing the unfolding problem in order to constrain the parameter space of solutions sought, sidestepping the inverse problem altogether. These improvements are demonstrated with trial measurements and verified using accelerator-based time-of-flight calculation of reference spectra. Then, a demonstration is presented in which the elemental compositions of low-Z neutron-attenuating materials are estimated to within 10%. These techniques could have direct application in verifying the presence of high-explosive materials in a neutron-emitting test item, as well as other for treaty verification challenges.

  3. Detecting nuclear warheads

    International Nuclear Information System (INIS)

    Fetter, S.; Frolov, V.A.; Prilutsky, O.F.; Rodionov, S.N.; Sagdeev, R.Z.; Miller, M.

    1992-01-01

    To the best of our knowledge, all nuclear weapons contain at least several kilograms of fissile material - material that can sustain a chain reaction. Such material provides the energy for fission explosives such as those that destroyed Hiroshima and Nagasaki; it is also used in the fission trigger modern thermonuclear weapons. The two fissile materials used in US and Soviet warheads are weapon grade uranium (WgU) and weapon-grade plutonium (WgPu). Fissile materials are radioactive; they are very dense and absorb certain radiations very well; and they can be fissioned. This paper reports on the two basic ways to detect fissile material: passive detection of the radiation emitted by its radioactive decay, or active detection involving either radiographing (x-raying) an object with neutrons or high-energy photons and detecting particles emitted by the resulting induced fissions. Passive detection is the preferred technique for verification purposes because of its simplicity and safety

  4. Applying the neutron scatter camera to treaty verification and warhead monitoring

    International Nuclear Information System (INIS)

    Cooper, Robert Lee; Gerling, Mark; Brennan, James S.; Mascarenhas, Nicholas; Mrowka, Stanley; Marleau, Peter

    2010-01-01

    The neutron scatter camera was originally developed for a range of SNM detection applications. We are now exploring the feasibility of applications in treaty verification and warhead monitoring using experimentation, maximum likelihood estimation method (MLEM), detector optimization, and MCNP-PoliMi simulations.

  5. Increasing transparency of nuclear-warhead and fissile-material stocks as a step toward disarmament -- Proposals for the NPT PrepCom, Geneva

    International Nuclear Information System (INIS)

    2013-04-01

    These proposals made by the International Panel on Fissile Materials IPFM at a conference in Geneva, Switzerland, in April 2013 discuss how increasing transparency can help disarmament efforts. After a short introduction to IPFM and its mission, the action plan on nuclear disarmament is looked at and the various nations involved are listed. A set of baseline declarations proposed are discussed. These include warhead stocks, potential new declarations and fissile material stocks. Monitoring by the International Atomic Energy Authority IAEA is also reviewed. Preparations for future declarations concerning warhead and delivery systems locations, stockpile histories and fissile material production and disposal aspects are reported on. Finally, co-operative verification projects, warhead dismantlement and past fissile material production are examined

  6. A New Approach to Nuclear Warhead Verification Using a Zero-Knowledge Protocol

    Energy Technology Data Exchange (ETDEWEB)

    Glaser,; Alexander, [Princeton University

    2012-05-16

    Warhead verification systems proposed to date fundamentally rely on the use of information barriers to prevent the release of classified design information. Measurements with information carriers significantly increase the complexity of inspection systems, make their certification and authentication difficult, and may reduce the overall confidence in the verifiability of future arms- control agreements. This talk presents a proof-of-concept of a new approach to nuclear warhead verification that minimizes the role of information barriers from the outset and envisions instead an inspection system that a priori avoids leakage of sensitive information using a so-called zero-knowledge protocol. The proposed inspection system is based on the template-matching approach and relies on active interrogation of a test object with 14-MeV neutrons. The viability of the method is examined with MCNP Monte Carlo neutron transport calculations modeling the experimental setup, an investigation of different diversion scenarios, and an analysis of the simulated data showing that it does not contain information about the properties of the inspected object.

  7. A treaty more alarming than efficient. The dismantled warheads will not be destroyed. Danger

    International Nuclear Information System (INIS)

    Riche, P.; Despic-Popovic, H.; Nougayrede, N.

    2002-01-01

    This political analysis presents the new treaty of nuclear weapons dismantling between Russia and Usa. In fact the warheads will not be completely dismantling but only stocked, leading to a possible recovery by terrorists. It underlines the real interests of this agreement which are more economic than peaceful. (A.L.B.)

  8. A new method of passive counting of nuclear missile warheads -a white paper for the Defense Threat Reduction Agency

    Energy Technology Data Exchange (ETDEWEB)

    Morris, Christopher [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Durham, J. Matthew [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Guardincerri, Elena [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bacon, Jeffrey Darnell [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wang, Zhehui [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Fellows, Shelby [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Poulson, Daniel Cris [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Plaud-Ramos, Kenie Omar [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Daughton, Tess Marie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Johnson, Olivia Ruth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-31

    Cosmic ray muon imaging has been studied for the past several years as a possible technique for nuclear warhead inspection and verification as part of the New Strategic Arms Reduction Treaty between the United States and the Russian Federation. The Los Alamos team has studied two different muon imaging methods for this application, using detectors on two sides and one side of the object of interest. In this report we present results obtained on single sided imaging of configurations aimed at demonstrating the potential of this technique for counting nuclear warheads in place with detectors above the closed hatch of a ballistic missile submarine.

  9. Disposition of plutonium from dismantled warheads: Belgonucleaire's proposal

    International Nuclear Information System (INIS)

    Haas, D.; Vanderborck, Y.; Vandenberg, C.; Vliet, J. van

    1996-01-01

    Set up in 1957 by Union Miniere, Belgonucleaire (BN) has been working since its origin in the field of plutonium and has accumulated extensive experience in the design and fabrication of mixed-oxide (MOX) fuel, as well as in the fuel management and licensing of MOX cores for fast breeder reactors (FBRs), pressurized water reactors (PWRs), and boiling water reactors (BWRs). Although BN's MOX plant first went into operation in 1973 (it was used for FBRs and light water reactor (LWR) demonstration fuel fabrication), industrial production started in 1986. The MOX fuel produced (280 t heavy metal (HM) until the end of 1995) has been loaded in PWRs and BWRs in four countries in Europe: France, Germany, Switzerland, and Belgium. They propose the development of MOX plants as the means for disposal of plutonium from warhead disassembly

  10. Investigation of the protection possibilities against enhanced radiation warhead

    International Nuclear Information System (INIS)

    Sahin, S.; Erisen, A.; Selvi, S.; Yalcin, S.

    1980-01-01

    To evaluate an enhanced radiation protection for the tank crew against the neutron bomb, we first have analysed the propagation of the 14.1 MeV neutron in air in S 8 approximation. Three new tank wall proposals for enhanced radiation protection have been discussed in S 4 approximation. The best protection for the tank crew against the neutron bomb radiation has been achieved by covering the internal tank wall with a borated polyethylene layer. However the radiation damage through the neutron bomb cannot be degradated to the radiation damage level by a standard nuclear warhead of comparable energy release. In the course of this study a 27 group hard spectra data library has been used. (orig.) 891 HP/orig. 892 CKA [de

  11. Effects of natural plant extracts and gamma rays on lactobacillus isolated from Korean traditional raw rice wine

    Energy Technology Data Exchange (ETDEWEB)

    Nam, Ji Young; Kim, Jae Hun; Lee, Ju Woon; Kim, Jin Kyu [Korea Atomic Energy Research Institute, Jeongeup (Korea, Republic of)

    2010-12-15

    Recently, Korean traditional raw rice wines (RRW) have received attention because they are a nutritious food with health properties. But the rapid deterioration of fermented RRW is one of the serious problems for brewing and marketing in the world beyond Korea. The goal of this study was to develop a way to enhance the quality and to lengthen the period of circulation of the RRW. A lactic acid bacterium was isolated from RRW. It was identified as Lactobacillus fermentum (98%) based on its biochemical properties, and 16S rRNA sequence. Treatments of RRW with gamma radiation and green tea extracts reduced the bacterial population except for yeasts and Lactobacillus in the RRW. This result suggested that the natural plant extracts and catechin products can be used as an effective natural storage agent.

  12. Effects of natural plant extracts and gamma rays on lactobacillus isolated from Korean traditional raw rice wine

    International Nuclear Information System (INIS)

    Nam, Ji Young; Kim, Jae Hun; Lee, Ju Woon; Kim, Jin Kyu

    2010-01-01

    Recently, Korean traditional raw rice wines (RRW) have received attention because they are a nutritious food with health properties. But the rapid deterioration of fermented RRW is one of the serious problems for brewing and marketing in the world beyond Korea. The goal of this study was to develop a way to enhance the quality and to lengthen the period of circulation of the RRW. A lactic acid bacterium was isolated from RRW. It was identified as Lactobacillus fermentum (98%) based on its biochemical properties, and 16S rRNA sequence. Treatments of RRW with gamma radiation and green tea extracts reduced the bacterial population except for yeasts and Lactobacillus in the RRW. This result suggested that the natural plant extracts and catechin products can be used as an effective natural storage agent

  13. 75 FR 80536 - Notice Pursuant to the National Cooperative Research and Production Act of 1993 National Warheads...

    Science.gov (United States)

    2010-12-22

    ... Production Act of 1993 National Warheads and Energetics Consortium Notice is hereby given that, on November 30, 2010, pursuant to Section 6(a) of the National Cooperative Research and Production Act of 1993... Mountain Scientific Laboratory, Centennial, CO; Rocky Research, Boulder City, NV; The Research Foundation...

  14. Shielding requirements for the transport of nuclear warhead components under decommissioning

    International Nuclear Information System (INIS)

    Hansen, L.F.

    1994-09-01

    The requirements to carry out accurate shielding calculations involved with the safe off-site transportation of packages containing nuclear warhead components, special assemblies and radioactive materials are discussed. The need for (a) detailed information on the geometry and material composition of the packaging and radioactive load, (b) accurate representation of the differential energy spectra (dN/dE) for the neutron and gamma spectra emitted by the radioactive materials enclosed in the packaging, (c) well-tested neutron and photon cross section libraries, (d) and accurate three-dimensional Monte Carlo transport codes are illustrated. A brief discussion of the need for reliable dose measurements is presented

  15. Low-Intrusion Techniques and Sensitive Information Management for Warhead Counting and Verification: FY2011 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Jarman, Kenneth D.; Robinson, Sean M.; McDonald, Benjamin S.; Gilbert, Andrew J.; Misner, Alex C.; Pitts, W. Karl; White, Timothy A.; Seifert, Allen; Miller, Erin A.

    2011-09-01

    Future arms control treaties may push nuclear weapons limits to unprecedented low levels and may entail precise counting of warheads as well as distinguishing between strategic and tactical nuclear weapons. Such advances will require assessment of form and function to confidently verify the presence or absence of nuclear warheads and/or their components. Imaging with penetrating radiation can provide such an assessment and could thus play a unique role in inspection scenarios. Yet many imaging capabilities have been viewed as too intrusive from the perspective of revealing weapon design details, and the potential for the release of sensitive information poses challenges in verification settings. A widely held perception is that verification through radiography requires images of sufficient quality that an expert (e.g., a trained inspector or an image-matching algorithm) can verify the presence or absence of components of a device. The concept of information barriers (IBs) has been established to prevent access to relevant weapon-design information by inspectors (or algorithms), and has, to date, limited the usefulness of radiographic inspection. The challenge of this project is to demonstrate that radiographic information can be used behind an IB to improve the capabilities of treaty-verification weapons-inspection systems.

  16. Transportation of nuclear weapons through urban areas in the United Kingdom

    International Nuclear Information System (INIS)

    1990-01-01

    This study concentrates on the road carriage of assembled nuclear warheads to and from the Royal Ordnance factory at Burghfield, Berkshire - a task that is necessary to deliver new warheads to the sites of storage and deployment, and which also entails movement of existing stocks of warheads being returned to Burghfield for maintenance, refurbishing and or replacement. During these movements there is risk of accident and damage to the warhead assemblies in transit and, therefore, consequences that could result in harm to people and property in the locality of the accident. (author)

  17. Authentication concept and impact of pit containers on neutron analysis

    Energy Technology Data Exchange (ETDEWEB)

    Goettsche, Malte [Centre for Science and Peace Research, University of Hamburg (Germany)

    2013-07-01

    One part of verifying the dismantlement of nuclear warheads will very likely be the authentication of warheads where their authenticities would be confirmed via radiation measurements. Such authentication would be more achievable if dismantled warhead components were verified as opposed to the entire warhead due to unknown shielding in the warhead that would be replaced in the case of components by shielding of a container where the design might be known. Such a procedure would require a robust chain-of-custody, where confidence would be created that the dismantled warhead components correspond to the former warhead in terms of integrity and identity. The argument is sometimes made though that the containers where the components would be stored act as a strong shielding that might prevent authentication measurements. In this presentation, plausible container configurations are considered and analyzed in regard to measurability of neutron multiplicities using Helium-3 detectors. Such a measurement would allow the determination of fissile mass which is considered one attribute for authenticating warheads.

  18. The use of helicopter-borne neutron detectors to detect nuclear warheads in the USSR-US Black Sea experiment

    International Nuclear Information System (INIS)

    Belyaev, S.T.; Lebedev, V.I.; Obinyakov, B.A.; Zemlyakov, M.V.; Ryazantsev, V.A.; Armashov, V.M.

    1992-01-01

    This paper reports that the Soviet Navy used a helicopter/ship system called Sovietnik to detect a cruise-missile warhead in the joint USSR-US experiment on the Black Sea, which took place on 5 July 1989. The system consists of a ship-based helicopter, equipped with a neutron detector and processing equipment, associated ship-based equipment. The neutron detector, together with instrumentation for recording preliminary processing, and analysis of initial information, is located on the helicopter, which carries out the measurement while flying slowly past the ship in question

  19. Farmer knowledge and a priori risk analysis: pre-release evaluation of genetically modified Roundup Ready wheat across the Canadian prairies.

    Science.gov (United States)

    Mauro, Ian J; McLachlan, Stéphane M; Van Acker, Rene C

    2009-09-01

    The controversy over the world's first genetically modified (GM) wheat, Roundup Ready wheat (RRW), challenged the efficacy of 'science-based' risk assessment, largely because it excluded the public, particularly farmers, from meaningful input. Risk analysis, in contrast, is broader in orientation as it incorporates scientific data as well as socioeconomic, ethical, and legal concerns, and considers expert and lay input in decision-making. Local knowledge (LK) of farmers is experience-based and represents a rich and reliable source of information regarding the impacts associated with agricultural technology, thereby complementing the scientific data normally used in risk assessment. The overall goal of this study was to explore the role of farmer LK in the a priori risk analysis of RRW. In 2004, data were collected from farmers using mail surveys sent across the three prairie provinces (i.e., Manitoba, Saskatchewan, and Alberta) in western Canada. A stratified random sampling approach was used whereby four separate sampling districts were identified in regions where wheat was grown for each province. Rural post offices were randomly selected in each sampling district using Canada Post databases such that no one post office exceeded 80 farms and that each sampling district comprised 225-235 test farms (n = 11,040). In total, 1,814 people responded, representing an adjusted response rate for farmers of 33%. A subsequent telephone survey showed there was no non-response bias. The primary benefits associated with RRW were associated with weed control, whereas risks emphasized the importance of market harm, corporate control, agronomic problems, and the likelihood of contamination. Overall, risks were ranked much higher than benefits, and the great majority of farmers were highly critical of RRW commercialization. In total, 83.2% of respondents disagreed that RRW should have unconfined release into the environment. Risk was associated with distrust in government and

  20. A treaty more alarming than efficient. The dismantled warheads will not be destroyed. Danger; Un traite plus inquietant qu'efficace. Les ogives demantelees ne seront pas detruites. Risque

    Energy Technology Data Exchange (ETDEWEB)

    Riche, P.; Despic-Popovic, H.; Nougayrede, N

    2002-07-01

    This political analysis presents the new treaty of nuclear weapons dismantling between Russia and Usa. In fact the warheads will not be completely dismantling but only stocked, leading to a possible recovery by terrorists. It underlines the real interests of this agreement which are more economic than peaceful. (A.L.B.)

  1. Securing nuclear warheads and materials: seven steps for immediate action

    International Nuclear Information System (INIS)

    Bunn, M.

    2002-01-01

    Full text: In the last decade, substantial progress has been made in improving security and accounting for nuclear weapons and weapons-usable nuclear material worldwide, both by states' own domestic actions and through international cooperation. Thousands of nuclear warheads and hundreds of tons of nuclear material are demonstrably more secure than they were before, and through programs such as the U.S.-Russian Highly Enriched Uranium (He) Purchase Agreement, enough potentially vulnerable bomb material for thousands of nuclear weapons has been verifiably destroyed. Since the attacks of September 11, 2001, the international community has attempted to expand and accelerate these efforts. But much more remains to be done. This paper summarizes a recent report from Harvard University, which recommended seven further steps for immediate action in U.S.-Russian and international cooperation. It covers two recommendations that may be of particular interest to this audience in detail. The first is a proposed program to remove nuclear material entirely from many of the most vulnerable sites around the world (by offering incentives targeted to the needs of each facility to give up the material at that site). The second is a suggestion that participants in the global partnership against the spread of weapons and materials of mass destruction announced at the June 2002 Group of Eight summit make a political commitment to meet stringent security standards for nuclear materials on their territories, and urge (and assist) other states to do likewise. (author)

  2. A REPRINT of a July 1991 Report to Congress, Executive Summary of Verification of Nuclear Warhead Dismantlement and Special Nuclear Material Controls

    International Nuclear Information System (INIS)

    Fuller, James L.

    2008-01-01

    With the renewed thinking and debate about deep reductions in nuclear weapons, including recent proposals about eliminating nuclear warheads altogether, republishing the general conclusions of the Robinson Committee Report of 1992 appears useful. The report is sometimes referred to as the 3151 Report, from Section 3151 of the National Defense Authorization Act for FY1991, from where its requirement originated. This report contains the Executive Summary only and the forwarding letters from the Committee, the President of the United States, the Secretary of Energy, and C Paul Robinson, the head of the Advisory Committee

  3. An NMR-Guided Screening Method for Selective Fragment Docking and Synthesis of a Warhead Inhibitor

    Directory of Open Access Journals (Sweden)

    Ram B. Khattri

    2016-07-01

    Full Text Available Selective hits for the glutaredoxin ortholog of Brucella melitensis are determined using STD NMR and verified by trNOE and 15N-HSQC titration. The most promising hit, RK207, was docked into the target molecule using a scoring function to compare simulated poses to experimental data. After elucidating possible poses, the hit was further optimized into the lead compound by extension with an electrophilic acrylamide warhead. We believe that focusing on selectivity in this early stage of drug discovery will limit cross-reactivity that might occur with the human ortholog as the lead compound is optimized. Kinetics studies revealed that lead compound 5 modified with an ester group results in higher reactivity than an acrylamide control; however, after modification this compound shows little selectivity for bacterial protein versus the human ortholog. In contrast, hydrolysis of compound 5 to the acid form results in a decrease in the activity of the compound. Together these results suggest that more optimization is warranted for this simple chemical scaffold, and opens the door for discovery of drugs targeted against glutaredoxin proteins—a heretofore untapped reservoir for antibiotic agents.

  4. An NMR-Guided Screening Method for Selective Fragment Docking and Synthesis of a Warhead Inhibitor.

    Science.gov (United States)

    Khattri, Ram B; Morris, Daniel L; Davis, Caroline M; Bilinovich, Stephanie M; Caras, Andrew J; Panzner, Matthew J; Debord, Michael A; Leeper, Thomas C

    2016-07-16

    Selective hits for the glutaredoxin ortholog of Brucella melitensis are determined using STD NMR and verified by trNOE and (15)N-HSQC titration. The most promising hit, RK207, was docked into the target molecule using a scoring function to compare simulated poses to experimental data. After elucidating possible poses, the hit was further optimized into the lead compound by extension with an electrophilic acrylamide warhead. We believe that focusing on selectivity in this early stage of drug discovery will limit cross-reactivity that might occur with the human ortholog as the lead compound is optimized. Kinetics studies revealed that lead compound 5 modified with an ester group results in higher reactivity than an acrylamide control; however, after modification this compound shows little selectivity for bacterial protein versus the human ortholog. In contrast, hydrolysis of compound 5 to the acid form results in a decrease in the activity of the compound. Together these results suggest that more optimization is warranted for this simple chemical scaffold, and opens the door for discovery of drugs targeted against glutaredoxin proteins-a heretofore untapped reservoir for antibiotic agents.

  5. Development of an air cleaning system for dissolving high explosives from nuclear warheads

    Energy Technology Data Exchange (ETDEWEB)

    Bergman, W.; Wilson, K.; Staggs, K.; Wapman, D. [Lawrence Livermore National Lab., CA (United States)

    1997-08-01

    The Department of Energy (DOE) has a major effort underway in dismantling nuclear weapons. In support of this effort we have been developing a workstation for removing the high explosive (HE) from nuclear warheads using hot sprays of dimethyl sulfoxide (DMSO) solvent to dissolve the HE. An important component of the workstation is the air cleaning system that is used to contain DMSO aerosols and vapor and radioactive aerosols. The air cleaning system consists of a condenser to liquefy the hot DMSO vapor, a demister pad to remove most of the DMSO aerosols, a high efficiency particulate air (HEPA) filter to remove the remaining aerosols, an activated carbon filter to remove the DMSO vapor, and a final HEPA filter to meet the redundancy requirement for HEPA filters in radioactive applications. The demister pad is a 4{double_prime} thick mat of glass and steel fibers and was selected after conducting screening tests on promising candidates. We also conducted screening tests on various activated carbons and found that all had a similar performance. The carbon breakthrough curves were fitted to a modified Wheeler`s equation and gave excellent predictions for the effect of different flow rates. After all of the components were assembled, we ran a series of performance tests on the components and system to determine the particle capture efficiency as a function of size for dioctyl sebacate (DOS) and DMSO aerosols using laser particle counters and filter samples. The pad had an efficiency greater than 990% for 0.1 {mu}m DMSO particles. Test results on the prototype carbon filter showed only 70% efficiency, instead of the 99.9% in small scale laboratory tests. Thus further work will be required to develop the prototype carbon filter. 7 refs., 18 figs., 10 tabs.

  6. Hip joint replacement

    Science.gov (United States)

    Hip arthroplasty; Total hip replacement; Hip hemiarthroplasty; Arthritis - hip replacement; Osteoarthritis - hip replacement ... Your hip joint is made up of 2 major parts. One or both parts may be replaced during surgery: ...

  7. REDUCTIONS WITHOUT REGRET: DEFINING THE NEEDED CAPABILITIES

    Energy Technology Data Exchange (ETDEWEB)

    Swegle, J.; Tincher, D.

    2013-09-10

    This is the second of three papers (in addition to an introductory summary) aimed at providing a framework for evaluating future reductions or modifications of the U.S. nuclear force, first by considering previous instances in which nuclear-force capabilities were eliminated; second by looking forward into at least the foreseeable future at the features of global and regional deterrence (recognizing that new weapon systems currently projected will have expected lifetimes stretching beyond our ability to predict the future); and third by providing examples of past or possible undesirable outcomes in the shaping of the future nuclear force, as well as some closing thoughts for the future. This paper begins with a discussion of the current nuclear force and the plans and procurement programs for the modernization of that force. Current weapon systems and warheads were conceived and built decades ago, and procurement programs have begun for the modernization or replacement of major elements of the nuclear force: the heavy bomber, the air-launched cruise missile, the ICBMs, and the ballistic-missile submarines. In addition, the Nuclear Weapons Council has approved a new framework for nuclear-warhead life extension not fully fleshed out yet that aims to reduce the current number of nuclear explosives from seven to five, the so-called 3+2 vision. This vision includes three interoperable warheads for both ICBMs and SLBMs (thus eliminating one backup weapon) and two warheads for aircraft delivery (one gravity bomb and one cruise-missile, eliminating a second backup gravity bomb). This paper also includes a discussion of the current and near-term nuclear-deterrence mission, both global and regional, and offers some observations on future of the strategic deterrence mission and the challenges of regional and extended nuclear deterrence.

  8. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; Arthroplasty - shoulder - discharge

  9. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  10. U.S. Strategic Nuclear Forces: Background, Developments, and Issues

    Science.gov (United States)

    2017-02-10

    Cost $85 Billion,” Bloomberg News , September 6, 2016. 62 Aaron Mehta, “Planned ICBM Replacement To Move Forward Without Consensus,” Defense News ...bombers, consistent with the terms of the New START Treaty, it also plans to develop new delivery systems for deployment over the next 20-30 years. The 115...1,550 deployed warheads in 2018, after the New START Treaty completes implementation. At the present time, the U.S. land-based ballistic missile force

  11. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... Ankle replacement surgery is most often done while you are under general anesthesia. This means you will ...

  12. Nicotine replacement therapy

    Science.gov (United States)

    Smoking cessation - nicotine replacement; Tobacco - nicotine replacement therapy ... Before you start using a nicotine replacement product, here are some things to know: The more cigarettes you smoke, the higher the dose you may need to ...

  13. Hip Replacement Surgery

    Science.gov (United States)

    ... Outreach Initiative Breadcrumb Home Health Topics English Español Hip Replacement Surgery Basics In-Depth Download Download EPUB ... PDF What is it? Points To Remember About Hip Replacement Surgery Hip replacement surgery removes damaged or ...

  14. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  15. Defining line replaceable units

    NARCIS (Netherlands)

    Parada Puig, J. E.; Basten, R. J I

    2015-01-01

    Defective capital assets may be quickly restored to their operational condition by replacing the item that has failed. The item that is replaced is called the Line Replaceable Unit (LRU), and the so-called LRU definition problem is the problem of deciding on which item to replace upon each type of

  16. Transcatheter aortic valve replacement

    Science.gov (United States)

    ... gov/ency/article/007684.htm Transcatheter aortic valve replacement To use the sharing features on this page, please enable JavaScript. Transcatheter aortic valve replacement (TAVR) is surgery to replace the aortic valve. ...

  17. Ankle replacement - discharge

    Science.gov (United States)

    ... total - discharge; Total ankle arthroplasty - discharge; Endoprosthetic ankle replacement - discharge; Osteoarthritis - ankle ... You had an ankle replacement. Your surgeon removed and reshaped ... an artificial ankle joint. You received pain medicine and were ...

  18. Patients Unicondylar Knee Replacement vs. Total Knee Replacement

    OpenAIRE

    Hedra Eskander

    2017-01-01

    The aim of this review article is to analyse the clinical effectiveness of total knee replacement (TKR) compared to unicondylar knee replacement (UKR) on patients. In terms of survival rates, revision rates and postoperative complications. The keywords used were: knee arthroplasty. Nearly three thousand articles were found on 25 August 2016. Of those, only twenty-five were selected and reviewed because they were strictly focused on the topic of this article. Compared with those who have TKR, ...

  19. Artificial Disc Replacement

    Science.gov (United States)

    ... Spondylolisthesis BLOG FIND A SPECIALIST Treatments Artificial Disc Replacement (ADR) Patient Education Committee Jamie Baisden The disc ... Disc An artificial disc (also called a disc replacement, disc prosthesis or spine arthroplasty device) is a ...

  20. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    . To shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega...... replacement was chosen in each company. Findings – The study shows that platform replacements primarily challenge managers' existing knowledge about platform architectures. A distinction can be made between “width” and “height” in platform replacements, and it is crucial that managers observe this in order...... to challenge their existing knowledge about platform architectures. Issues on technologies, architectures, components and processes as well as on segments, applications and functions are identified. Practical implications – Practical implications are summarized and discussed in relation to a framework...

  1. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  2. Study on Penetration Characteristics of Tungsten Cylindrical Penetrator

    Energy Technology Data Exchange (ETDEWEB)

    Jo, Jong Hyun; Lee, Young Shin; Kim, Jae Hoon [Chungnam Nat' l Univ., Daejeon (Korea, Republic of); Bae, Yong Woon [Agency for Defense Development, Daejeon (Korea, Republic of)

    2013-09-15

    The design of missile require extremely small warheads that must be highly efficient and lethal. The penetration characteristics of each penetrator and the total number of penetrators on the warhead are obvious key factors that influence warhead lethality. The design of the penetrator shape and size are directly related to the space and weight of the warhead. The design of the penetrator L/D was directly related to the space and weight of the warhead. L and D are the length and the diameter of the projectile, respectively. The AUTODYN-3a code was used to study the effect of penetrator penetration. The objective of numerical analysis was to determine the penetration characteristics of penetrator produced by hypervelocity impacts under different initial conditions such as initial velocity, obliquity angle and L/D of penetrator. The residual velocity and residual mass were decreased with increasing initial impact velocity under L/D{<=}4.

  3. Plant Equipment Packages: Are they a Credible Deterrent to War

    Science.gov (United States)

    1990-12-01

    PEP# TYPE CONTRACTOR/FACILITY NAME LOCATION 0112 WARHEAD CHAPARRAL M250 0112 WARHEAD HELFIRE MISSILE SYSTEM 0112 WARHEAD HE M225 LAP (DRAGON) 0112...0149 GRENADE SMK SCRN RP UKL8A3 F/ M250 LAUNCHER 0149 ROCKET 66MM INCEND TPA 4RD CLIP M74 0149 WARHEAD RKT 2.75IN SMK WP M156 W/FZ PD M427 0149 ROCKET...M25A2 (COMPLETE) 0149 GRENADE HAND/RIFLE SMK WP M34 W/F M206A2. 0149 GRENADE HAND RIOT CS ABC-M7A3 W/FZ M201AI 0149 GRENADE SMK SCRN RP UKL8A3 F/ M250

  4. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  5. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert

    Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism

    Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves

  6. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  7. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  8. Unmaking the bomb: Verifying limits on the stockpiles of nuclear weapons

    Science.gov (United States)

    Glaser, Alexander

    2017-11-01

    Verifying limits on the stockpiles of nuclear weapons may require the ability for international in-spectors to account for individual warheads, even when non-deployed, and to confirm the authenticity of nuclear warheads prior to dismantlement. These are fundamentally new challenges for nuclear verification, and they have been known for some time; unfortunately, due to a lack of sense of urgency, research in this area has not made substantial progress over the past 20 years. This chapter explores the central outstanding issues and offers a number of possible paths forward. In the case of confirming numerical limits, these in-clude innovative tagging techniques and approaches solely based on declarations using modern crypto-graphic escrow schemes; with regard to warhead confirmation, there has recently been increasing interest in developing fundamentally new measurement approaches where, in one form or another, sensitive infor-mation is not acquired in the first place. Overall, new international R&D efforts could more usefully focus on non-intrusive technologies and approaches, which may show more promise for early demonstration and adoption. In the meantime, while warhead dismantlements remain unverified, nuclear weapon states ought to begin to document warhead assembly, refurbishment, and dismantlement activities and movements of warheads and warhead components through the weapons complex in ways that international inspectors will find credible at a later time. Again, such a process could be enabled by modern cryptographic techniques such as blockchaining. Finally, and perhaps most importantly, it is important to recognize that the main reason for the complexity of technologies and approaches needed for nuclear disarmament verification is the requirement to protect information that nuclear weapon states consider sensitive. Ultimately, if information security concerns cannot be resolved to the satisfaction of all stakeholders, an alternative would be to "reveal the

  9. Pipe replacement in a water supply network: coordinated versus uncoordinated replacement and budget effects

    NARCIS (Netherlands)

    Dijk, van D.; Hendrix, E.M.T.

    2016-01-01

    Operators of underground water supply networks are challenged with pipe replacement
    decisions, because pipes are subject to increased failure rates as they age and financial resources
    are often limited.We study the optimal replacement time and optimal number of pipe replacements
    such

  10. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints. Copyright © 2016 Elsevier Inc. All rights reserved.

  11. Hip Replacement: MedlinePlus Health Topic

    Science.gov (United States)

    ... invasive hip replacement (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hip Replacement updates ... replacement - precautions Minimally invasive hip replacement Related Health Topics Hip Injuries and Disorders National Institutes of Health ...

  12. Aorto-right atrial fistula after ascending aortic replacement or aortic value replacement

    International Nuclear Information System (INIS)

    Zhi Aihua; Dai Ruping; Jiang Shiliang; Lu Bin

    2012-01-01

    Objective: To evaluate the CT features of aorto-right atrial fistula after aortic valve replacement (AVR) or ascending aortic replacement. Methods: Eighty-seven patients with aortic-right atrial fistula underwent CT after operation. The CT features were retrospectively analyzed. Fistula was measured according to maximum width of the shunt. Results: Aorto-right atrial fistula was detected in 87 patients after aortic valve replacement or ascending aortic replacement by CT scan. Among them, 25 patients were diagnosed as mild aorto-right atrial fistula, 47 patients as moderate, and 15 patients as severe. Thirty-seven patients underwent follow-up CT.Among them, 10 patients with mild to moderate aorto-right atrial fistula were considered to have complete regression, 8 patients with mild aorto-right atrial fistula considered to have incomplete regression, 14 patients with mild to moderate aorto-right atrial fistula considered to have stable condition, and 5 patients with moderate aorto-right atrial fistula considered to have progression at the 3-month follow-up. Conclusion: CT is a useful tool for defining aorto-right atrial fistula after AVR or ascending aortic replacement and for evaluating it in follow-up. (authors)

  13. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy...... operations were completed as mini-sternotomies, 4 died later of noncardiac causes. The aortic cross-clamp and perfusion times were significantly different across all groups (P replacement...... is an excellent operation in selected patients, but its true advantages over conventional aortic valve replacement (other than a smaller scar) await evaluation by means of randomized clinical trial. The "extended mini-aortic valve replacement" operation, on the other hand, is a risky procedure that should...

  14. Scope Complexity Options Risks Excursions (SCORE) Version 3.0 Mathematical Description.

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Samberson, Jonell Nicole [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Shettigar, Subhasini [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jungels, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Welch, Kimberly M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Dean A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options. The results of this model allow those considering these options to understand the complexity tradeoffs between proposed warhead options. The core idea of SCORE is to divide a warhead option into a well- defined set of scope elements and then estimate the complexity of each scope element against a well understood reference system. The uncertainty associated with estimates can also be captured. A weighted summation of the relative complexity of each scope element is used to determine the total complexity of the proposed warhead option or portions of the warhead option (i.e., a National Work Breakdown Structure code). The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA- 12 led Enterprise Modeling and Analysis Consortium (EMAC), that has provided the data elicitation, integration and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

  15. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series—Normal anatomy To use the sharing ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  16. 24 CFR 891.405 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.405....405 Replacement reserve. (a) Establishment of reserve. The Owner shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance and repair and replacement of capital items...

  17. 24 CFR 880.602 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 880.602... Replacement reserve. (a) A replacement reserve must be established and maintained in an interest-bearing account to aid in funding extraordinary maintenance and repair and replacement of capital items. (1) Part...

  18. 24 CFR 891.855 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserves. 891.855... § 891.855 Replacement reserves. (a) The mixed-finance owner shall establish and maintain a replacement... the funds will be used to pay for capital replacement costs for the Section 202 or 811 supportive...

  19. Bibliography of Joint Aircraft Survivability Reports and Related Documents

    Science.gov (United States)

    1994-07-01

    the GEN-X Model from ESAMS 1.5 to ESAMS 1.7 (U) 82 NWSC0CRAflfl JTCG/AS-91-SM-008 ROCOCO COLUMN Warhead Threat Performance Model (U) 83 JTCG/AS-91-SM...of the transition. 82 SM-3-17 JTCG/AS-91-SM-008 SECRET Title: ROCOCO COLUMN Warhead Threat Performance Model (U) Issued: February 1991 DTIC AD # Not...Lillard Gilbert Abstract: (U) The ROCOCO COLUMN Warhead Threat characterization program was conducted specifically to provide fragment weight, shape

  20. 25 CFR 700.53 - Dwelling, replacement.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Dwelling, replacement. 700.53 Section 700.53 Indians THE... Policies and Instructions Definitions § 700.53 Dwelling, replacement. The term replacement dwelling means a dwelling selected by the head of a household as a replacement dwelling that meets the criteria of this...

  1. Could wind replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    This article aims at assessing the situation produced by a total replacement of nuclear energy by wind energy, while facing consumption demand at any moment, notably in December. The authors indicate the evolution of the French energy mix during December 2016, and the evolution of the rate between wind energy production and the sum of nuclear and wind energy production during the same month, and then give briefly some elements regarding necessary investments in wind energy to wholly replace nuclear energy. According to them, such a replacement would be ruinous

  2. Carbohydrates as Fat Replacers.

    Science.gov (United States)

    Peng, Xingyun; Yao, Yuan

    2017-02-28

    The overconsumption of dietary fat contributes to various chronic diseases, which encourages attempts to develop and consume low-fat foods. Simple fat reduction causes quality losses that impede the acceptance of foods. Fat replacers are utilized to minimize the quality deterioration after fat reduction or removal to achieve low-calorie, low-fat claims. In this review, the forms of fats and their functions in contributing to food textural and sensory qualities are discussed in various food systems. The connections between fat reduction and quality loss are described in order to clarify the rationales of fat replacement. Carbohydrate fat replacers usually have low calorie density and provide gelling, thickening, stabilizing, and other texture-modifying properties. In this review, carbohydrates, including starches, maltodextrins, polydextrose, gums, and fibers, are discussed with regard to their interactions with other components in foods as well as their performances as fat replacers in various systems.

  3. The Stockpile Monitor Program

    International Nuclear Information System (INIS)

    Buntain, G.A.; Fletcher, M.; Rabie, R.

    1994-07-01

    Recent political changes have led to drastic reductions in the number of nuclear warheads in stockpile, as well as increased expectations for warhead-service lives. In order to support and maintain a shrinking and aging nuclear stockpile, weapon scientists and engineers need detailed information describing the environments experienced by weapons in the field. Hence, the Stockpile Monitor Program was initiated in 1991 to develop a comprehensive and accurate database of temperature and humidity conditions experienced by nuclear warheads both in storage and on-alert

  4. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  5. Can photovoltaic replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    As the French law on energy transition for a green growth predicts that one third of nuclear energy production is to be replaced by renewable energies (wind and solar) by 2025, and while the ADEME proposes a 100 per cent renewable scenario for 2050, this paper proposes a brief analysis of the replacement of nuclear energy by solar photovoltaic energy. It presents and discusses some characteristics of photovoltaic production: production level during a typical day for each month (a noticeable lower production in December), evolution of monthly production during a year, evolution of the rate between nuclear and photovoltaic production. A cost assessment is then proposed for energy storage and for energy production, and a minimum cost of replacement of nuclear by photovoltaic is assessed. The seasonal effect is outlined, as well as the latitude effect. Finally, the authors outline the huge cost of such a replacement, and consider that public support to new photovoltaic installations without an at least daily storage mean should be cancelled

  6. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  7. Technical challenges for dismantlement verification

    International Nuclear Information System (INIS)

    Olinger, C.T.; Stanbro, W.D.; Johnston, R.G.; Nakhleh, C.W.; Dreicer, J.S.

    1997-01-01

    In preparation for future nuclear arms reduction treaties, including any potential successor treaties to START I and II, the authors have been examining possible methods for bilateral warhead dismantlement verification. Warhead dismantlement verification raises significant challenges in the political, legal, and technical arenas. This discussion will focus on the technical issues raised by warhead arms controls. Technical complications arise from several sources. These will be discussed under the headings of warhead authentication, chain-of-custody, dismantlement verification, non-nuclear component tracking, component monitoring, and irreversibility. The authors will discuss possible technical options to address these challenges as applied to a generic dismantlement and disposition process, in the process identifying limitations and vulnerabilities. They expect that these considerations will play a large role in any future arms reduction effort and, therefore, should be addressed in a timely fashion

  8. Delirium After Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Giuseffi, Jennifer L; Borges, Nyal E; Boehm, Leanne M; Wang, Li; McPherson, John A; Fredi, Joseph L; Ahmad, Rashid M; Ely, E Wesley; Pandharipande, Pratik P

    2017-07-01

    Postoperative delirium is associated with increased mortality. Patients undergoing transcatheter aortic valve replacement are at risk for delirium because of comorbid conditions. To compare the incidence, odds, and mortality implications of delirium between patients undergoing transcatheter replacement and patients undergoing surgical replacement. The Richmond Agitation-Sedation Scale and the Confusion Assessment Method for the Intensive Care Unit were used to assess arousal level and delirium prospectively in all patients with severe aortic stenosis who had transcatheter or surgical aortic valve replacement at an academic medical center. Multivariable logistic regression was used to determine the relationship between procedure type and occurrence of delirium. Cox regression was used to assess the association between postoperative delirium and 6-month mortality. A total of 105 patients had transcatheter replacement and 121 had surgical replacement. Patients in the transcatheter group were older (median age, 81 vs 68 years; P replacement. Delirium is less likely to develop in the transcatheter group but is associated with higher mortality in both groups. ©2017 American Association of Critical-Care Nurses.

  9. Feeder replacement tooling and processes

    International Nuclear Information System (INIS)

    Mallozzi, R.; Goslin, R.; Pink, D.; Askari, A.

    2008-01-01

    Primary heat transport system feeder integrity has become a concern at some CANDU nuclear plants as a result of thinning caused by flow accelerated corrosion (FAC). Feeder inspections are indicating that life-limiting wall thinning can occur in the region between the Grayloc hub weld and second elbow of some outlet feeders. In some cases it has become necessary to replace thinned sections of affected feeders to restore feeder integrity to planned end of life. Atomic Energy of Canada Limited (AECL) and Babcock and Wilcox Canada Ltd. (B and W) have developed a new capability for replacement of single feeders at any location on the reactor face without impacting or interrupting operation of neighbouring feeders. This new capability consists of deploying trained crews with specialized tools and procedures for feeder replacements during planned outages. As may be expected, performing single feeder replacement in the congested working environment of an operational CANDU reactor face involves overcoming many challenges with respect to access to feeders, available clearances for tooling, and tooling operation and performance. This paper describes some of the challenges encountered during single feeder replacements and actions being taken by AECL and B and W to promote continuous improvement of feeder replacement tooling and processes and ensure well-executed outages. (author)

  10. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  11. Design verification for reactor head replacement

    International Nuclear Information System (INIS)

    Dwivedy, K.K.; Whitt, M.S.; Lee, R.

    2005-01-01

    This paper outlines the challenges of design verification for reactor head replacement for PWR plants and the program for qualification from the prospective of the utility design engineering group. This paper is based on the experience with the design confirmation of four reactor head replacements for two plants, and their interfacing components, parts, appurtenances, and support structures. The reactor head replacement falls under the jurisdiction of the applicable edition of the ASME Section XI code, with particular reference to repair/replacement activities. Under any repair/replacement activities, demands may be encountered in the development of program and plan for replacement due to the vintage of the original design/construction Code and the design reports governing the component qualifications. Because of the obvious importance of the reactor vessel, these challenges take on an added significance. Additional complexities are introduced to the project, when the replacement components are fabricated by vendors different from the original vendor. Specific attention is needed with respect to compatibility with the original design and construction of the part and interfacing components. The program for reactor head replacement requires evaluation of welding procedures, applicable examination, test, and acceptance criteria for material, welds, and the components. Also, the design needs to take into consideration the life of the replacement components with respect to the extended period of operation of the plant after license renewal and other plant improvements. Thus, the verification of acceptability of reactor head replacement provides challenges for development and maintenance of a program and plan, design specification, design report, manufacturer's data report and material certification, and a report of reconciliation. The technical need may also be compounded by other challenges such as widely scattered global activities and organizational barriers, which

  12. Diagenetic replacement of Micas by Carbonates

    NARCIS (Netherlands)

    Oele, E.

    1961-01-01

    In the Ordovician sandstones of the Cantabrian Mountains a replacement of the micas by carbonate minerals could be observed. The absence of metamorphic minerals suggests a diagenetic replacement. This is supported by the finding of the same type of replacement in some undisturbed Pliocene sediments

  13. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  14. 24 CFR 891.605 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.605... 8 Assistance § 891.605 Replacement reserve. (a) Establishment of reserve. The Borrower shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance, and repair and...

  15. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  16. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Wiechmann, K.

    1993-01-01

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.) [de

  17. 30 CFR 800.30 - Replacement of bonds.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Replacement of bonds. 800.30 Section 800.30... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.30 Replacement... replacement performance bonds. Replacement of a performance bond pursuant to this section shall not constitute...

  18. 24 CFR 572.125 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ...) Homeownership Program Requirements-Implementation Grants § 572.125 Replacement reserves. (a) Purpose. A single replacement reserve may be established for the homeownership program only if HUD determines it is necessary to... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Replacement reserves. 572.125...

  19. Investigation of gamma-ray fingerprint identifying mechanism for the types of radiation sources

    CERN Document Server

    Liu Su Ping; Gu Dang Chang; Gong-Jian; Hao Fan Hua; Hu Guang Chun

    2002-01-01

    Radiation fingerprints sometimes can be used to label and identify the radiation resources. For instance, in a future nuclear reduction treaty that requires verification of irreversible dismantling of reduced nuclear warheads, the radiation fingerprints of nuclear warheads are expected to play a key role in labelling and identifying the reduced warheads. It would promote the development of nuclear warheads deep-cuts verification technologies if authors start right now some investigations on the issues related to the radiation fingerprints. The author dedicated to the investigation of gamma-ray fingerprint identifying mechanism for the types of radiation resources. The purpose of the identifying mechanism investigation is to find a credible way to tell whether any two gamma-ray spectral fingerprints that are under comparison are radiated from the same resource. The authors created the spectrum pattern comparison (SPC) to study the comparability of the two radiation fingerprints. Guided by the principle of SPC,...

  20. Long-life slab replacement concrete.

    Science.gov (United States)

    2015-03-01

    This research was initiated following reports of high incidence of cracking on FDOT concrete pavement replacement : slab projects. Field slabs were instrumented for data acquisition from high-early-strength concrete pavement : replacement slabs place...

  1. Nuclear reactor fuel replacement system

    International Nuclear Information System (INIS)

    Kayano, Hiroyuki; Joge, Toshio.

    1976-01-01

    Object: To permit the direction in which a fuel replacement unit is moving to be monitored by the operator. Structure: When a fuel replacement unit approaches an intermediate goal position preset in the path of movement, renewal of data display on a goal position indicator is made every time the goal position is changed. With this renewal, the prevailing direction of movement of the fuel replacement unit can be monitored by the operator. When the control of movement is initiated, the co-ordinates of the intermediate goal point A are displayed on a goal position indicator. When the replacement unit reaches point A, the co-ordinates of the next intermediate point B are displayed, and upon reaching point B the co-ordinates of the (last) goal point C are displayed. (Nakamura, S.)

  2. 24 CFR 970.31 - Replacement units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement units. 970.31 Section... PUBLIC HOUSING PROGRAM-DEMOLITION OR DISPOSITION OF PUBLIC HOUSING PROJECTS § 970.31 Replacement units. Notwithstanding any other provision of law, replacement public housing units may be built on the original public...

  3. 31 CFR 361.8 - Claim for replacement.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Claim for replacement. 361.8 Section... § 361.8 Claim for replacement. Claim for replacement shall be made in writing to the Secretary, to the..., Parkersburg, WV 26106-1328. The claim, accompanied by a recommendation regarding the manner of replacement...

  4. Effect of growth hormone replacement therapy on pituitary hormone secretion and hormone replacement therapies in GHD adults

    DEFF Research Database (Denmark)

    Hubina, Erika; Mersebach, Henriette; Rasmussen, Ase Krogh

    2004-01-01

    We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes.......We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes....

  5. 24 CFR 891.745 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.745... and Individuals-Section 162 Assistance § 891.745 Replacement reserve. The general requirements for the replacement reserve are provided in § 891.605. For projects funded under §§ 891.655 through 891.790, the...

  6. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  7. Prolonged Intermittent Renal Replacement Therapy.

    Science.gov (United States)

    Edrees, Fahad; Li, Tingting; Vijayan, Anitha

    2016-05-01

    Prolonged intermittent renal replacement therapy (PIRRT) is becoming an increasingly popular alternative to continuous renal replacement therapy in critically ill patients with acute kidney injury. There are significant practice variations in the provision of PIRRT across institutions, with respect to prescription, technology, and delivery of therapy. Clinical trials have generally demonstrated that PIRRT is non-inferior to continuous renal replacement therapy regarding patient outcomes. PIRRT offers cost-effective renal replacement therapy along with other advantages such as early patient mobilization and decreased nursing time. However, due to lack of standardization of the procedure, PIRRT still poses significant challenges, especially pertaining to appropriate drug dosing. Future guidelines and clinical trials should work toward developing consensus definitions for PIRRT and ensure optimal delivery of therapy. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  8. A Bayesian perspective on some replacement strategies

    International Nuclear Information System (INIS)

    Mazzuchi, Thomas A.; Soyer, Refik

    1996-01-01

    In this paper we present a Bayesian decision theoretic approach for determining optimal replacement strategies. This approach enables us to formally incorporate, express, and update our uncertainty when determining optimal replacement strategies. We develop relevant expressions for both the block replacement protocol with minimal repair and the age replacement protocol and illustrate the use of our approach with real data

  9. Transforming Normal Programs by Replacement

    NARCIS (Netherlands)

    Bossi, Annalisa; Pettorossi, A.; Cocco, Nicoletta; Etalle, Sandro

    1992-01-01

    The replacement transformation operation, already defined in [28], is studied wrt normal programs. We give applicability conditions able to ensure the correctness of the operation wrt Fitting's and Kunen's semantics. We show how replacement can mimic other transformation operations such as thinning,

  10. Replacement of sub-systems

    International Nuclear Information System (INIS)

    Rosen, S.E.

    1992-01-01

    This paper describes a number of quality aspects related to replacement of important systems or components in a nuclear power station. Reference is given to the steam generator replacement and power uprating performed at Ringhals 2 in Sweden in 1989. Since quality is a wide concept there has been put special emphasis in this paper to the important aspects that traditionally are not connected to quality. (author) 1 fig

  11. Prerequisites for a nuclear weapons convention

    International Nuclear Information System (INIS)

    Liebert, W.

    1999-01-01

    A Nuclear Weapons Convention (NWC) would prohibit the research, development, production, testing, stockpiling, transfer, use and threat of use of nuclear weapons and would serve their total elimination.' In this fashion it follows the model laid out by the biological and chemical weapons conventions. The NWC would encompass a few other treaties and while replacing them should learn from their experiences. The Nuclear Weapons Convention should at some given point in the future replace the Non-Proliferation Treaty (NPT) and so resolve its contradictions and shortcomings. The main objectives of an NWC Would be: reduction of the nuclear arsenals of the 'five' nuclear weapons powers down to zero within a set of fixed periods of time; elimination of stockpiles of weapons-usable materials and, where existent, nuclear warheads in de-facto nuclear weapon and threshold states; providing assurance that all states will retain their non-nuclear status forever

  12. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  13. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  14. Prioritization methodology for chemical replacement

    Science.gov (United States)

    Cruit, Wendy; Goldberg, Ben; Schutzenhofer, Scott

    1995-01-01

    Since United States of America federal legislation has required ozone depleting chemicals (class 1 & 2) to be banned from production, The National Aeronautics and Space Administration (NASA) and industry have been required to find other chemicals and methods to replace these target chemicals. This project was initiated as a development of a prioritization methodology suitable for assessing and ranking existing processes for replacement 'urgency.' The methodology was produced in the form of a workbook (NASA Technical Paper 3421). The final workbook contains two tools, one for evaluation and one for prioritization. The two tools are interconnected in that they were developed from one central theme - chemical replacement due to imposed laws and regulations. This workbook provides matrices, detailed explanations of how to use them, and a detailed methodology for prioritization of replacement technology. The main objective is to provide a GUIDELINE to help direct the research for replacement technology. The approach for prioritization called for a system which would result in a numerical rating for the chemicals and processes being assessed. A Quality Function Deployment (QFD) technique was used in order to determine numerical values which would correspond to the concerns raised and their respective importance to the process. This workbook defines the approach and the application of the QFD matrix. This technique: (1) provides a standard database for technology that can be easily reviewed, and (2) provides a standard format for information when requesting resources for further research for chemical replacement technology. Originally, this workbook was to be used for Class 1 and Class 2 chemicals, but it was specifically designed to be flexible enough to be used for any chemical used in a process (if the chemical and/or process needs to be replaced). The methodology consists of comparison matrices (and the smaller comparison components) which allow replacement technology

  15. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Howden, G.F.

    1996-01-01

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  16. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  17. Optimal composition of fluid-replacement beverages.

    Science.gov (United States)

    Baker, Lindsay B; Jeukendrup, Asker E

    2014-04-01

    The objective of this article is to provide a review of the fundamental aspects of body fluid balance and the physiological consequences of water imbalances, as well as discuss considerations for the optimal composition of a fluid replacement beverage across a broad range of applications. Early pioneering research involving fluid replacement in persons suffering from diarrheal disease and in military, occupational, and athlete populations incurring exercise- and/or heat-induced sweat losses has provided much of the insight regarding basic principles on beverage palatability, voluntary fluid intake, fluid absorption, and fluid retention. We review this work and also discuss more recent advances in the understanding of fluid replacement as it applies to various populations (military, athletes, occupational, men, women, children, and older adults) and situations (pathophysiological factors, spaceflight, bed rest, long plane flights, heat stress, altitude/cold exposure, and recreational exercise). We discuss how beverage carbohydrate and electrolytes impact fluid replacement. We also discuss nutrients and compounds that are often included in fluid-replacement beverages to augment physiological functions unrelated to hydration, such as the provision of energy. The optimal composition of a fluid-replacement beverage depends upon the source of the fluid loss, whether from sweat, urine, respiration, or diarrhea/vomiting. It is also apparent that the optimal fluid-replacement beverage is one that is customized according to specific physiological needs, environmental conditions, desired benefits, and individual characteristics and taste preferences.

  18. Computer simulation of replacement sequences in copper

    International Nuclear Information System (INIS)

    Schiffgens, J.O.; Schwartz, D.W.; Ariyasu, R.G.; Cascadden, S.E.

    1978-01-01

    Results of computer simulations of , , and replacement sequences in copper are presented, including displacement thresholds, focusing energies, energy losses per replacement, and replacement sequence lengths. These parameters are tabulated for six interatomic potentials and shown to vary in a systematic way with potential stiffness and range. Comparisons of results from calculations made with ADDES, a quasi-dynamical code, and COMENT, a dynamical code, show excellent agreement, demonstrating that the former can be calibrated and used satisfactorily in the analysis of low energy displacement cascades. Upper limits on , , and replacement sequences were found to be approximately 10, approximately 30, and approximately 14 replacements, respectively. (author)

  19. Permanent Quadriplegia Following Replacement of Voice Prosthesis.

    Science.gov (United States)

    Ozturk, Kayhan; Erdur, Omer; Kibar, Ertugrul

    2016-11-01

    The authors presented a patient with quadriplegia caused by cervical spine abscess following voice prosthesis replacement. The authors present the first reported permanent quadriplegia patient caused by voice prosthesis replacement. The authors wanted to emphasize that life-threatening complications may be faced during the replacement of voice prosthesis. Care should be taken during the replacement of voice prosthesis and if some problems have been faced during the procedure patients must be followed closely.

  20. Structural considerations in steam generator replacement

    International Nuclear Information System (INIS)

    Bertheau, S.R.; Gazda, P.A.

    1991-01-01

    Corrosion of the tubes and tube-support structures inside pressurized water reactor (PWR) steam generators has led many utilities to consider a replacement of the generators. Such a project is a major undertaking for a utility and must be well planned to ensure an efficient and cost-effective effort. This paper discusses various structural aspects of replacement options, such as total or partial generator replacement, along with their associated pipe cuts; major structural aspects associated with removal paths through the equipment hatch or through an opening in the containment wall, along with the related removal processes; onsite movement and storage of the generators; and the advantages and disadvantages of the removal alternatives. This paper addresses the major structural considerations associated with a steam generator replacement project. Other important considerations (e.g., licensing, radiological concerns, electrical requirements, facilities for management and onsite administrative activities, storage and fabrication activities, and offsite transportation) are not discussed in this paper, but should be carefully considered when undertaking a replacement project

  1. Development of Mortar Simulator with Shell-In-Shell System – Problem of External Ballistics

    Directory of Open Access Journals (Sweden)

    A. Fedaravicius

    2007-01-01

    Full Text Available The shell-in-shell system used in the mortar simulator raises a number of non-standard technical and computational problems starting from the requirement to distribute the propelling blast energy between the warhead and the ballistic barrel, finishing with the requirement that the length of warhead's flight path must be scaled to combat shell firing tables. The design problem of the simulator is split into two parts – the problem of external ballistics where the initial velocities of the warhead must be determined, and the problem of internal ballistics – where the design of the cartridge and the ballistic barrel must be performed.

  2. Knee Replacement

    Science.gov (United States)

    ... days. Medications prescribed by your doctor should help control pain. During the hospital stay, you'll be encouraged to move your ... exercise your new knee. After you leave the hospital, you'll continue physical ... mobility and a better quality of life. And most knee replacements can be ...

  3. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  4. 30 CFR 75.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 75.1438 Section 75.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... attachment replacement. Wire rope attachments shall be replaced when cracked, deformed, or excessively worn. ...

  5. 49 CFR 541.6 - Requirements for replacement parts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Requirements for replacement parts. 541.6 Section....6 Requirements for replacement parts. (a) Each replacement part for a part specified in § 541.5(a) must have the registered trademark of the manufacturer of the replacement part, or some other unique...

  6. 30 CFR 57.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 57.19028 Section 57.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Hoisting Wire Ropes § 57.19028 End attachment replacement. Wire rope attachments shall be replaced when...

  7. 30 CFR 56.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 56.19028 Section 56.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Wire Ropes § 56.19028 End attachment replacement. Wire rope attachments shall be replaced when cracked...

  8. 30 CFR 77.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 77.1438 Section 77.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... Personnel Hoisting Wire Ropes § 77.1438 End attachment replacement. Wire rope attachments shall be replaced...

  9. Reactive resistance welding of Ti6Al4V alloy with the use of Ni(V)/Al multilayers

    Energy Technology Data Exchange (ETDEWEB)

    Maj, Lukasz; Morgiel, Jerzy [Institute of Metallurgy and Materials Science, Polish Academy of Sciences, Krakow (Poland); Mars, Krzysztof; Godlewska, Elzbieta [Faculty of Materials Science and Ceramics, AGH University of Science and Technology, Krakow (Poland)

    2017-02-15

    The freestanding Ni(V)/Al multilayer foil was applied as a filler material in order to join Ti6Al4V alloy with the use of reactive resistance welding (RRW) technique. Present investigations, performed with the use of transmission electron microscopy (TEM) method, allowed to show that an application of high current (I = 400 A for 2 min in vacuum conditions ∝10{sup -1} mbar) transformed the Ni(V)/Al multilayers into fine grain (<300 nm) NiAl phase. It also showed that the RRW process led to the formation of firm connection with nanoporosity limited only to the original contact plane between base material and the foil. Simultaneously, the formation of a narrow strip of crystallites of Ti{sub 3}Al intermetallic phase elongated along the joint line (average size of ∝200 nm) was observed. The base material was separated from the joint area by a layer of up to ∝2 μm thickness of nearly defect free α-Ti and β-Ti grains from a heat affected zone (HAZ). The performed experiment proved that Ni(V)/Al multilayer could serve as a filler material for joining of Ti6Al4V alloys even without additional solder layer. (copyright 2016 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  10. Opportunistic replacement of fusion power system parts

    International Nuclear Information System (INIS)

    Day, J.A.; George, L.L.

    1981-01-01

    This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits

  11. Risks of hip and knee replacement

    Science.gov (United States)

    ... is normal to lose blood during and after hip or knee replacement surgery. Some people need a ... clot form are higher during and soon after hip or knee replacement surgery. Sitting or lying down ...

  12. Skilled nursing facilities after joint replacement

    Science.gov (United States)

    ... care providers in the weeks before your joint replacement. They can advise you about whether going directly ... of many people who have had a joint replacement? Can they tell you how many? A good ...

  13. The use of transcatheter aortic valve replacement vs surgical aortic valve replacement for the treatment of aortic stenosis

    Directory of Open Access Journals (Sweden)

    Jensen HA

    2015-08-01

    Full Text Available Hanna A Jensen, Lillian L Tsai, Vinod H Thourani Division of Cardiothoracic Surgery, Joseph B Whitehead Department of Surgery, Structural Heart and Valve Center, Emory University School of Medicine, Atlanta, GA, USA Abstract: Severe aortic stenosis (AS is associated with considerable morbidity and mortality and is increasing in prevalence as the global population increases. Since AS primarily affects the elderly, many of these patients have comorbidities that make them poor candidates for the gold standard treatment for AS, surgical aortic valve replacement. Transcatheter aortic valve replacement has emerged as a novel technology for the management of AS in higher risk patients over the past decade. Randomized trials have established the safety and efficacy of transcatheter aortic valve replacement, and the medical community has rallied to identify the patients who are most suitable for this transformative treatment. This review focuses on outlining the key procedural differences, describing the unique challenges of both operations, and finally assessing and comparing outcomes both on a general level and in challenging patient subgroups. Keywords: aortic valve replacement, transcatheter aortic valve replacement, surgical aortic valve replacement 

  14. Long-life slab replacement concrete : [summary].

    Science.gov (United States)

    2015-04-01

    Concrete slab replacement projects in Florida have demonstrated a high incidence of : replacement slab cracking. Causes of cracking have not been reliably determined. University of South Florida researchers : sought to identify the factors or : param...

  15. Hip or knee replacement - in the hospital after

    Science.gov (United States)

    Hip replacement surgery - after - self-care; Knee replacement surgery - after - self-care ... taking walks in the hallways with help. After knee replacement, some surgeons recommend using a continuous passive ...

  16. Temelin NPP - IandC replacement

    International Nuclear Information System (INIS)

    Spalenka, I.

    1997-01-01

    The original instrumentation and control system of the Temelin nuclear power plant is being upgraded and replaced by a modern Westinghouse-supplied system which meets the requirements imposed on current nuclear power plant designs. The history and purpose of the IandC system replacement is given, and the design of the new system is described in some detail. (A.K.)

  17. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  18. Hormone Replacement Therapy and Your Heart

    Science.gov (United States)

    Hormone replacement therapy and your heart Are you taking — or considering — hormone therapy to treat bothersome menopausal symptoms? Understand ... you. By Mayo Clinic Staff Long-term hormone replacement therapy used to be routinely prescribed for postmenopausal ...

  19. HedgeHOGS: A Rapid Nuclear Hedge Sizing and Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Adam F. [United States Military Academy, West Point, NY (United States); Steinfeldt, Bradley Alexander [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Lafleur, Jarret Marshall [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Hawley, Marilyn F. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Shannon, Lisa M. [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2017-07-01

    The U.S. nuclear stockpile hedge is an inventory of non-deployed nuclear warheads and a force structure capable of deploying those warheads. Current guidance is to retain this hedge to mitigate the risk associated with the technical failure of any single warhead type or adverse geopolitical developments that could require augmentation of the force. The necessary size of the hedge depends on the composition of the nuclear stockpile and assumed constraints. Knowing the theoretical minimum hedge given certain constraints is useful when considering future weapons policy. HedgeHOGS, an Excel-based tool, was developed to enable rapid calculation of the minimum hedge size associated with varying active stockpile composition and hedging strategies.

  20. New one cycle criteria for optimizing preventive replacement policies

    International Nuclear Information System (INIS)

    Hamidi, Maryam; Szidarovszky, Ferenc; Szidarovszky, Miklos

    2016-01-01

    Models are introduced and examined for the optimum scheduling of preventive replacements. The “replace first” and “replace last” models are known from the literature if the long term expected cost per unit time is minimized. We will first introduce the one cycle counterparts of these models when the expected costs per unit time in a single cycle is minimized. If the unit performs identical projects sequentially then the “replace next” model assumes that the preventive replacement is postponed until the ongoing project is finished. The termination time of this project is random which also depends on the scheduled time of the preventive replacement in contrary to the “replace first” and “replace last” models. The mathematical models are formulated and conditions are given for the existence of finite optima. Numerical examples and a simulation study illustrate the methodology and the numerical results show interesting comparisons of the different models. - Highlights: • The Single cycle age replacement model is extended incorporating repairable failures. • In order to avoid project interruption costs, three model variants are discussed. • Model variants are replace first, replace last and replace next. • In many cases analytic solutions are derived and illustrated by numerical examples. • The different model variants and their results are compared based on simulation studies.

  1. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    2005-01-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  2. Replacement Saltwell Pumping System Document Bibliography

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document bibliography is prepared to identify engineering documentation developed during the design of the Replacement Saltwell Pumping System. The bibliography includes all engineering supporting documents and correspondence prepared prior to the deployment of the system in the field. All documents referenced are available electronically through the Records Management Information System (RMIS). Major components of the Replacement Saltwell Pumping System include the Sundyne Canned Motor Pump, the Water Filter Skid, the Injection Water Skid and the Backflow Preventer Assembly. Drawing H-14-104498 provides an index of drawings (fabrication details, PandIDs, etc.) prepared to support development of the Replacement Saltwell Pumping System. Specific information pertaining to new equipment can be found in Certified Vendor Information (CVI) File 50124. This CVI file has been established specifically for new equipment associated with the Replacement Saltwell Pumping System

  3. Optimum body size of Holstein replacement heifers.

    Science.gov (United States)

    Hoffman, P C

    1997-03-01

    Criteria that define optimum body size of replacement heifers are required by commercial dairy producers to evaluate replacement heifer management programs. Historically recommended body size criteria have been based on live BW measurements. Numerous research studies have observed a positive relationship between BW at first calving and first lactation milk yield, which has served as the impetus for using live BW to define body size of replacement heifers. Live BW is, however, not the only available measurement to define body size. Skeletal measurements such as wither height, length, and pelvic area have been demonstrated to be related to first lactation performance and (or) dystocia. Live BW measurements also do not define differences in body composition. Differences in body composition of replacement heifers at first calving are also related to key performance variables. An updated research data base is available for the modern Holstein genotype to incorporate measures of skeletal growth and body composition with BW when defining body size. These research projects also lend insight into the relative importance of measurements that define body size of replacement heifers. Incorporation of these measurements from current research into present BW recommendations should aid commercial dairy producers to better define replacement heifer growth and management practices. This article proposes enhancements in defining optimum body size and growth characteristics of Holstein replacement heifers.

  4. Knee joint replacement

    Science.gov (United States)

    ... to make everyday tasks easier. Practice using a cane, walker , crutches , or a wheelchair correctly. On the ... ask your doctor Knee joint replacement - discharge Preventing falls Preventing falls - what to ask your doctor Surgical ...

  5. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Science.gov (United States)

    D'Emic, Michael D; Whitlock, John A; Smith, Kathlyn M; Fisher, Daniel C; Wilson, Jeffrey A

    2013-01-01

    Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs.

  6. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Directory of Open Access Journals (Sweden)

    Michael D D'Emic

    Full Text Available BACKGROUND: Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. METHODOLOGY/PRINCIPAL FINDINGS: We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days. Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. CONCLUSIONS/SIGNIFICANCE: Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size, and derived titanosaurs and

  7. 7 CFR 1944.659 - Replacement housing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Replacement housing. 1944.659 Section 1944.659 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) HOUSING Housing Preservation Grants § 1944.659 Replacement housing...

  8. New Firm Performance and the Replacement of Founder-CEOs

    DEFF Research Database (Denmark)

    Chen, Jing; Thompson, Peter

    2015-01-01

    We study the causes and consequences of the replacement of founder-CEOs in a sample of 4,172 Danish start-ups. We propose that founder-CEO replacement is driven in part by mismatches between business quality and founder ability. Our framework suggests that replacements are more likely among...... the worst- and best-performing firms, with low (high)-ability founders replaced by manager with higher (lower) ability. Replacement is not unambiguously associated with better subsequent performance. Firms that replaced the founder were much more likely to fail, but the surviving firms among them grew...

  9. Age replacement models: A summary with new perspectives and methods

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Al-Khalifa, Khalifa N.; Magid Hamouda, Abdel; Nakagawa, Toshio

    2017-01-01

    Age replacement models are fundamental to maintenance theory. This paper summarizes our new perspectives and hods in age replacement models: First, we optimize the expected cost rate for a required availability level and vice versa. Second, an asymptotic model with simple calculation is proposed by using the cumulative hazard function skillfully. Third, we challenge the established theory such that preventive replacement should be non-random and only corrective replacement should be made for the unit with exponential failure. Fourth, three replacement policies with random working cycles are discussed, which are called overtime replacement, replacement first, and replacement last, respectively. Fifth, the policies of replacement first and last are formulated with general models. Sixth, age replacement is modified for the situation when the economical life cycle of the unit is a random variable with probability distribution. Finally, models of a parallel system with constant and random number of units are taken into considerations. The models of expected cost rates are obtained and optimal replacement times to minimize them are discussed analytically and computed numerically. Further studies and potential applications are also indicated at the end of discussions of the above models. - Highlights: • Optimization of cost rate for availability level is discussed and vice versa. • Asymptotic and random replacement models are discussed. • Overtime replacement, replacement first and replacement last are surveyed. • Replacement policy with random life cycle is given. • A parallel system with random number of units is modeled.

  10. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  11. Report on the meeting for examining replacing core

    International Nuclear Information System (INIS)

    1977-01-01

    At the time of examining the application for approval of reactor installation, it must be confirmed that the safety of the concerned reactor is secured with not only the initially loaded core but also the replacing core. Besides, it must be confirmed again that the various criteria concerning the safety are satisfied after the start of operation, because a part of the parameters of the replacing core is dependent on the operational history. On the above described viewpoints, the main parameters affecting the safety and the nuclear and thermal limits of replacing core were reviewed. Moreover, the contents of description concerning replacing core in the application form were examined. As the general matters concerning the safety of replacing core, the scram reactivity curves for BWRs and PWRs, the method of description in the application form concerning the fuel containing gadolinia, and the use of burnable poison in replacing core were examined. The meeting for examining replacing core was organized on September 20, 1976, at the Committee for Examining Reactor Safety, and this report was compiled as the results of 10 meetings. (Kako, I.)

  12. Hip Resurfacing: An Alternative to Conventional Hip Replacement?

    Science.gov (United States)

    ... Is hip resurfacing a good alternative to hip replacement? Answers from Mark Spangehl, M.D. Hip resurfacing has lost favor with many surgeons ... women with poor bone quality. Unlike traditional hip replacement, hip resurfacing doesn't completely replace the "ball" ...

  13. Electrocatalysts Prepared by Galvanic Replacement

    Directory of Open Access Journals (Sweden)

    Athanasios Papaderakis

    2017-03-01

    Full Text Available Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases hydrogen evolution too, both oxygen levels and the pH must be optimized. The resulting bimetallic material can in principle have a Mnoble-rich shell and M-rich core (denoted as Mnoble(M leading to a possible decrease in noble metal loading and the modification of its properties by the underlying metal M. This paper reviews a number of bimetallic or ternary electrocatalytic materials prepared by galvanic replacement for fuel cell, electrolysis and electrosynthesis reactions. These include oxygen reduction, methanol, formic acid and ethanol oxidation, hydrogen evolution and oxidation, oxygen evolution, borohydride oxidation, and halide reduction. Methods for depositing the precursor metal M on the support material (electrodeposition, electroless deposition, photodeposition as well as the various options for the support are also reviewed.

  14. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  15. Telerehabilitation Feasibility in Total Joint Replacement

    Directory of Open Access Journals (Sweden)

    Mark J. Nelson

    2017-11-01

    Full Text Available Despite documented benefits, many Total Joint Replacement (TJR patients find it difficult to access rehabilitation following discharge from hospital. One solution to improve access for TJR patients is telerehabilitation. This study aimed to assess the feasibility of introducing a telerehabilitation program for TJR patients.   TJR patients at QEII Jubilee Hospital were invited to complete a questionnaire regarding their access, feelings towards and preferences in using technology. Seventy-five patients were recruited. Most patients had computer access (72% and internet (69% at home. Sixty-five percent of participants were willing to participate in telerehabilitation. A significant difference was found between older and younger patients. Watching videos on an electronic device was the preferred method for a technology-based home exercise program and phone call the preferred method of communication.  Results indicate telerehabilitation in the TJR population is feasible from the perspective of access to, feelings toward, and preferences for technology. Keywords: Hip replacement, Knee replacement, Telerehabilitation, Telemedicine, Total joint replacement

  16. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1989-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab

  17. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1990-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor

  18. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  19. 30 CFR 57.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 57.19122 Section 57.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 57.19122 Replacement parts. Parts used to repair hoists shall have properties...

  20. 30 CFR 56.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 56.19122 Section 56.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 56.19122 Replacement parts. Parts used to repair hoists shall have properties...

  1. Partial knee replacement

    Science.gov (United States)

    ... good range of motion in your knee. The ligaments in your knee are stable. However, most people with knee arthritis have a surgery called a total knee arthroplasty (TKA). Knee replacement is most often done in people age 60 ...

  2. ReplacementMatrix: a web server for maximum-likelihood estimation of amino acid replacement rate matrices.

    Science.gov (United States)

    Dang, Cuong Cao; Lefort, Vincent; Le, Vinh Sy; Le, Quang Si; Gascuel, Olivier

    2011-10-01

    Amino acid replacement rate matrices are an essential basis of protein studies (e.g. in phylogenetics and alignment). A number of general purpose matrices have been proposed (e.g. JTT, WAG, LG) since the seminal work of Margaret Dayhoff and co-workers. However, it has been shown that matrices specific to certain protein groups (e.g. mitochondrial) or life domains (e.g. viruses) differ significantly from general average matrices, and thus perform better when applied to the data to which they are dedicated. This Web server implements the maximum-likelihood estimation procedure that was used to estimate LG, and provides a number of tools and facilities. Users upload a set of multiple protein alignments from their domain of interest and receive the resulting matrix by email, along with statistics and comparisons with other matrices. A non-parametric bootstrap is performed optionally to assess the variability of replacement rate estimates. Maximum-likelihood trees, inferred using the estimated rate matrix, are also computed optionally for each input alignment. Finely tuned procedures and up-to-date ML software (PhyML 3.0, XRATE) are combined to perform all these heavy calculations on our clusters. http://www.atgc-montpellier.fr/ReplacementMatrix/ olivier.gascuel@lirmm.fr Supplementary data are available at http://www.atgc-montpellier.fr/ReplacementMatrix/

  3. 30 CFR 823.14 - Soil replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Soil replacement. 823.14 Section 823.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-OPERATIONS ON PRIME FARMLAND § 823.14 Soil replacement. (a) Soil...

  4. Valve-sparing and valve-replacing techniques for aortic root replacement in patients with Marfan syndrome: Analysis of early outcome.

    Science.gov (United States)

    Volguina, Irina V; Miller, D Craig; LeMaire, Scott A; Palmero, Laura C; Wang, Xing Li; Connolly, Heidi M; Sundt, Thoralf M; Bavaria, Joseph E; Dietz, Harry C; Milewicz, Dianna M; Coselli, Joseph S

    2009-05-01

    A prospective, international registry study was initiated to provide contemporary comparative data on short-term clinical outcomes after aortic valve-sparing and aortic valve-replacing root operations in patients with Marfan syndrome. The purpose of this initial report is to describe the study design and to compare early outcomes in the first 151 enrolled patients. We assessed 30-day outcomes in 151 patients who met strict Ghent diagnostic criteria for Marfan syndrome and underwent aortic root replacement with either valve-replacing (n = 46) or valve-sparing techniques (n = 105) at one of 18 participating centers. In the valve replacement group, a mechanical composite valve graft was used in 39 (85%) patients and a bioprosthetic valve in 7 (15%). In the valve-sparing group, David V procedures were performed in 57 (54%) patients, David I in 38 (36%), David IV in 8 (8%), Florida sleeve in 1 (1%), and Yacoub remodeling in 1 (1%). No in-hospital or 30-day deaths occurred. Despite longer crossclamp and cardiopulmonary bypass times in the valve-sparing group, there were no significant between-group differences in postoperative complications. Thirty-day valve-related complications occurred in 2 (4%) patients undergoing valve replacement and in 3 (3%) undergoing valve-sparing procedures (P = .6). The analysis of early outcomes revealed that valve-sparing techniques were the most common approach to root replacement in patients with Marfan syndrome in these centers. The complexity of valve-sparing root replacement did not translate into any demonstrable adverse early outcomes. Subsequent analysis will compare the 3-year durability of these two surgical approaches.

  5. A Bayesian perspective on age replacement with minimal repair

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Yeh, R.H.; Lin, Y.-B.; Juang, M.-G.

    1999-01-01

    In this article, a Bayesian approach is developed for determining an optimal age replacement policy with minimal repair. By incorporating minimal repair, planned replacement, and unplanned replacement, the mathematical formulas of the expected cost per unit time are obtained for two cases - the infinite-horizon case and the one-replacement-cycle case. For each case, we show that there exists a unique and finite optimal age for replacement under some reasonable conditions. When the failure density is Weibull with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal age replacement policy. Further, various special cases are discussed in detail. Finally, a numerical example is given

  6. 14 CFR 21.9 - Replacement and modification articles.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Replacement and modification articles. 21.9... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS General § 21.9 Replacement and modification articles. (a) If a person knows, or should know, that a replacement or modification article is reasonably likely to be...

  7. 45 CFR 201.70 - Treatment of replacement checks.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Treatment of replacement checks. 201.70 Section... STATES FOR PUBLIC ASSISTANCE PROGRAMS Review and Audits § 201.70 Treatment of replacement checks. (a... (FFP) for replacement checks under titles I, VI-A, X, XIV, XVI (AABD) except under the circumstances...

  8. 30 CFR 56.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 56.12036 Section 56.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... § 56.12036 Fuse removal or replacement. Fuses shall not be removed or replaced by hand in an energized...

  9. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    Iizuka, N.

    2000-01-01

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  10. Essential Specification Elements for Heat Exchanger Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Bower, L.

    2015-07-01

    Performance upgrade and equipment degradation are the primary impetuses for a nuclear power plant to engage in the large capital cost project of heat exchanger replacement. Along with attention to these issues, consideration of heat exchanger Codes and Standards, material improvements, thermal redesign, and configuration are essential for developing User’s Design Specifications for successful replacement projects. The User’s Design Specification is the central document in procuring ASME heat exchangers. Properly stated objectives for the heat exchanger replacement are essential for obtaining the materials, configurations and thermal designs best suited for the nuclear power plant. Additionally, the code of construction required and the applied manufacturing standard (TEMA or HEI) affects how the heat exchanger may be designed or configured to meet the replacement goals. Knowledge of how Codes and Standards affect design and configuration details will aid in writing the User’s Design Specification. Joseph Oat Corporation has designed and fabricated many replacement heat exchangers for the nuclear power industry. These heat exchangers have been constructed per ASME Section III to various Code-Years or ASME Section VIII-1 to the current Code-Year also in accordance with TEMA and HEI. These heat exchangers have been a range of like-for-like replacement to complete thermal, material and configuration redesigns. Several examples of these heat exchangers with their Code, Standard and specification implications are presented. (Author.

  11. A replaceable reflective film for solar concentrators

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  12. Replacement Models Revisited | Alabi | Journal of Research in ...

    African Journals Online (AJOL)

    The objective is to review the annual total cost and the cumulative annual total cost average hitherto used as replacement methods. The study showed some disparity in the optimal age of single replacement as used by some authors. Hence, an arithmetic mean method of finding the optimal single- replacement- age of an ...

  13. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    Dunn, J.T.; Kakaria, B.K.

    1982-09-01

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  14. Transcatheter Aortic Valve Replacement in Europe

    DEFF Research Database (Denmark)

    Mylotte, Darren; Osnabrugge, Ruben L J; Windecker, Stephan

    2013-01-01

    The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy.......The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy....

  15. An abstract machine for module replacement

    OpenAIRE

    Walton, Chris; Krl, Dilsun; Gilmore, Stephen

    1998-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement from the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection.

  16. Aeronautical Information System Replacement -

    Data.gov (United States)

    Department of Transportation — Aeronautical Information System Replacement is a web-enabled, automation means for the collection and distribution of Service B messages, weather information, flight...

  17. Fleet replacement modeling : final report, July 2009.

    Science.gov (United States)

    2009-07-01

    This project focused on two interrelated areas in equipment replacement modeling for fleets. The first area was research-oriented and addressed a fundamental assumption in engineering economic replacement modeling that all assets providing a similar ...

  18. Nuclear Proliferation: A Historical Overview

    Science.gov (United States)

    2008-03-01

    Soviet Union in 1991, Kazakhstan inherited approximately 1,410 nuclear warheads and the Semipalatinsk nuclear weapons test site . This placed Kazakhstan...Soviet Union, Kazakhstan inherited approximately 1,410 nuclear warheads and the Semipalatinsk nuclear weapons test site . See Mark D. Skootsky, “An...construction of a nuclear test site . This development moved Brazil into the Modest Weapons Potential category. In 1979 the Pilot Uranium Enrichment Plant

  19. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  20. Apparatus for fuel replacement

    International Nuclear Information System (INIS)

    Imada, Takahiko.

    1974-01-01

    Object: To support a telescope mast such that no deforming load is applied to it even during massive vibration, it is held fixed at the time of fuel replacement to permit satisfactory remote control operation by automatic operation. Structure: The body of the fuel replacement apparatus is provided with telescope mast fixing means comprising a slide base supported for reciprocal movement with respect to a telescope mast, an operating arm pivoted at the slide base, a wrist member mounted on the free end of the operating arm and an engagement member for restricting the slide base and operating arm at the time of loading and unloading the fuel. When loading and unloading the fuel, the slide base and operating arm are restrained by the engagement member to reliably restrict the vibration of the telescope mast. When the fuel replacement apparatus is moved, the means provided on the operating arm is smoothly displaced to follow the swing (vibration) of the telescope mast to prevent the deforming load from being applied to the support portion or other areas. The wrist member supports the telescope mast such that it can be rotated while restraining movement in the axial direction, and it is provided with revolution drive means for rotating the telescope mast under remote control. (Kamimura, M.)

  1. Mitochondrial replacement techniques: egg donation, genealogy and eugenics.

    Science.gov (United States)

    Palacios-González, César

    2016-03-01

    Several objections against the morality of researching or employing mitochondrial replacement techniques have been advanced recently. In this paper, I examine three of these objections and show that they are found wanting. First I examine whether mitochondrial replacement techniques, research and clinical practice, should not be carried out because of possible harms to egg donors. Next I assess whether mitochondrial replacement techniques should be banned because they could affect the study of genealogical ancestry. Finally, I examine the claim that mitochondrial replacement techniques are not transferring mitochondrial DNA but nuclear DNA, and that this should be prohibited on ethical grounds.

  2. Joint replacement in Zambia: A review of Hip & Knee Replacement ...

    African Journals Online (AJOL)

    Methods: Data captured by the different variables entered into the Joint Register covering the pre-op, intra-op and post-op period of all total hip and knee replacement surgery done at the ZIOH from 1998 to 2010 was entered into a spreadsheet after verification with individual patient medical records. This was then imported ...

  3. Cadmium plating replacements

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, M.J.; Groshart, E.C.

    1995-03-01

    The Boeing Company has been searching for replacements to cadmium plate. Two alloy plating systems seem close to meeting the needs of a cadmium replacement. The two alloys, zinc-nickel and tin-zinc are from alloy plating baths; both baths are neutral pH. The alloys meet the requirements for salt fog corrosion resistance, and both alloys excel as a paint base. Currently, tests are being performed on standard fasteners to compare zinc-nickel and tin-zinc on threaded hardware where cadmium is heavily used. The Hydrogen embrittlement propensity of the zinc-nickel bath has been tested, and just beginning for the tin-zinc bath. Another area of interest is the electrical properties on aluminum for tin-zinc and will be discussed. The zinc-nickel alloy plating bath is in production in Boeing Commercial Airplane Group for non-critical low strength steels. The outlook is promising that these two coatings will help The Boeing Company significantly reduce its dependence on cadmium plating.

  4. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1990-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. The methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and is expected to continue operation for at least and additional 25 years. Aging evaluations are in progress to address additional replacements that may be needed during this period

  5. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1989-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. Methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and will continue operation for perhaps another 20 years. Aging evaluations are in program to address additional replacements that may be needed during this extended time period. 3 figs

  6. Renal replacement therapy in healthy adult horses.

    Science.gov (United States)

    Wong, D M; Witty, D; Alcott, C J; Sponseller, B A; Wang, C; Hepworth, K

    2013-01-01

    Renal replacement therapy (RRT) has been implemented extensively in people to facilitate recovery from acute renal failure (ARF). RRT has not been explored in horses, but might provide a further treatment option in horses with ARF. To investigate efficacy and safety of RRT in horses. Five healthy adult horses. A prospective study was performed on horses restrained in stocks and intravenously connected to a commercial RRT machine to allow continuous venovenous hemodiafiltration to be performed for 6 hours. The RRT machine was set at the following flow rates: blood flow rate 250 mL/min; dialysate rate 3,000 mL/h; prefilter replacement pump 3,000 mL/h; and postfilter replacement pump rate 2,000 mL/h. Balanced electrolyte solution was used as dialysate and replacement fluid. Heart rate, respiratory rate, body temperature, direct arterial blood pressure, urine output, and various clinicopathologic parameters were measured over the study period. Renal replacement therapy was successfully performed in horses, resulting in a mean creatinine clearance of 0.127 mL/kg/min (68.9 mL/min) and urea reduction ratio of 24%. No adverse effects were detected although a significant decrease in rectal temperature was observed (P ≤ .007). A significant increase in serum phosphorus (P ≤ .001) and decrease in BUN (P replacement therapy can safely and effectively be used in adult horses. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  7. Avascular necrosis of bone complicating corticosteroid replacement therapy.

    OpenAIRE

    Williams, P L; Corbett, M

    1983-01-01

    Two patients who developed widespread severe avascular necrosis of bone while on steroid replacement therapy are described. One, a diabetic, underwent yttrium-90 pituitary ablation for retinopathy and developed avascular necrosis within 18 months of starting prednisolone. The other, who had Addison's disease, developed avascular necrosis within 14 months of starting cortisol replacement therapy. Both cases came to bilateral total hip replacement.

  8. THE AGGREGATE IMPLICATIONS OF MACHINE REPLACEMENT: THEORY AND EVIDENCE

    OpenAIRE

    John Haltiwanger; Russell Cooper

    1992-01-01

    The authors study an economy in which producers incur resource costs to replace depreciated machines. The process of costly replacement and depreciation creates endogenous fluctuations in productivity, employment, and output of a single producer. The authors explore the spillover effects of machine replacement on other sectors of the economy and provide conditions for synchronized machine replacement by multiple independent producers. The implications of their model are generally consistent w...

  9. A.R.T. – Aggression Replacement Training

    DEFF Research Database (Denmark)

    Harbo, Lotte Junker; Domben, Eskil

    2015-01-01

    Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training.......Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training....

  10. Optimal timing for intravascular administration set replacement.

    Science.gov (United States)

    Ullman, Amanda J; Cooke, Marie L; Gillies, Donna; Marsh, Nicole M; Daud, Azlina; McGrail, Matthew R; O'Riordan, Elizabeth; Rickard, Claire M

    2013-09-15

    The tubing (administration set) attached to both venous and arterial catheters may contribute to bacteraemia and other infections. The rate of infection may be increased or decreased by routine replacement of administration sets. This review was originally published in 2005 and was updated in 2012. The objective of this review was to identify any relationship between the frequency with which administration sets are replaced and rates of microbial colonization, infection and death. We searched The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library 2012, Issue 6), MEDLINE (1950 to June 2012), CINAHL (1982 to June 2012), EMBASE (1980 to June 2012), reference lists of identified trials and bibliographies of published reviews. The original search was performed in February 2004. We also contacted researchers in the field. We applied no language restriction. We included all randomized or controlled clinical trials on the frequency of venous or arterial catheter administration set replacement in hospitalized participants. Two review authors assessed all potentially relevant studies. We resolved disagreements between the two review authors by discussion with a third review author. We collected data for seven outcomes: catheter-related infection; infusate-related infection; infusate microbial colonization; catheter microbial colonization; all-cause bloodstream infection; mortality; and cost. We pooled results from studies that compared different frequencies of administration set replacement, for instance, we pooled studies that compared replacement ≥ every 96 hours versus every 72 hours with studies that compared replacement ≥ every 48 hours versus every 24 hours. We identified 26 studies for this updated review, 10 of which we excluded; six did not fulfil the inclusion criteria and four did not report usable data. We extracted data from the remaining 18 references (16 studies) with 5001 participants: study designs included neonate and adult

  11. Some economic aspects of steam generator replacements in nuclear power plants

    International Nuclear Information System (INIS)

    Lebegner, J.

    1995-01-01

    The steam generator replacements performed over last decade (about 25 replacements until now), indicate trends towards improved techniques, shorter schedules and reduced total exposure and total costs. The goal of this paper is to give a worldwide review of SG replacement experience with accent on the economic aspect of the SG replacement. The main information about carried out replacements will be presented: cost, schedules, exposures, SG supplier and type, date of replacement, etc. Furthermore, the paper will contain the list of planned steam generator replacements in Europe, Japan and US future replacement plans. Finally, some of NPPs will be described whose initial nominal power has been increased along with SG replacement. (author)

  12. Replacing fuel alignment in Germany

    International Nuclear Information System (INIS)

    Poetz, F.; Kalthoff, W.

    1991-01-01

    Up to the end of 1989 varying numbers of broken fuel alignment pins were detected in several German PWRs (80 broken pins in all). The distribution of these broken pins over the core cross-section was more or less random. The problem was due to the stress corrosion cracking of the pin material and was restricted to individual pins. It was concluded that all fuel alignment pins made of Inconel X-750 should be replaced. The development of a new pin, more resistant to intergranular stress corrosion, and the replacement technique are outlined. (author)

  13. HST Replacement Battery Initial Performance

    Science.gov (United States)

    Krol, Stan; Waldo, Greg; Hollandsworth, Roger

    2009-01-01

    The Hubble Space Telescope (HST) original Nickel-Hydrogen (NiH2) batteries were replaced during the Servicing Mission 4 (SM4) after 19 years and one month on orbit.The purpose of this presentation is to highlight the findings from the assessment of the initial sm4 replacement battery performance. The batteries are described, the 0 C capacity is reviewed, descriptions, charts and tables reviewing the State Of Charge (SOC) Performance, the Battery Voltage Performance, the battery impedance, the minimum voltage performance, the thermal performance, the battery current, and the battery system recharge ratio,

  14. Insurance for replacement power costs

    International Nuclear Information System (INIS)

    Cleaver, A.

    1980-01-01

    Although careful consideration is given to insurance against physical damage to plant and equipment, little thought is given to the costs that will be incurred in replacing the power that is lost while a relatively efficient system is out of action. The results of an investigation carried out for a generating authority with an installed capacity of about 3000 MW is given. Replacement power costs for different cases of severity of damage range from Pound1.17m per month for damage to central services taking out all four units. (author)

  15. Contribution of V(H replacement products in mouse antibody repertoire.

    Directory of Open Access Journals (Sweden)

    Lin Huang

    Full Text Available VH replacement occurs through RAG-mediated recombination between the cryptic recombination signal sequence (cRSS near the 3' end of a rearranged VH gene and the 23-bp RSS from an upstream unrearranged VH gene. Due to the location of the cRSS, VH replacement leaves a short stretch of nucleotides from the previously rearranged VH gene at the newly formed V-D junction, which can be used as a marker to identify VH replacement products. To determine the contribution of VH replacement products to mouse antibody repertoire, we developed a Java-based VH Replacement Footprint Analyzer (VHRFA program and analyzed 17,179 mouse IgH gene sequences from the NCBI database to identify VH replacement products. The overall frequency of VH replacement products in these IgH genes is 5.29% based on the identification of pentameric VH replacement footprints at their V-D junctions. The identified VH replacement products are distributed similarly in IgH genes using most families of VH genes, although different families of VH genes are used differentially. The frequencies of VH replacement products are significantly elevated in IgH genes derived from several strains of autoimmune prone mice and in IgH genes encoding autoantibodies. Moreover, the identified VH replacement footprints in IgH genes from autoimmune prone mice or IgH genes encoding autoantibodies preferentially encode positively charged amino acids. These results revealed a significant contribution of VH replacement products to the diversification of antibody repertoire and potentially, to the generation of autoantibodies in mice.

  16. A Study on the System Importance Analysis in SMART

    International Nuclear Information System (INIS)

    Kim, Kil Yoo; Kang, Dae Il; Kim, Tae Woon; Jin, Young Ho

    2011-01-01

    Importance analysis using RAW(Risk Achievement Worth) and RRW(Risk Reduction Worth) for the systems of SMART(System integrated Modular Advanced ReacTor) was performed. Usually PSA quantification software provide importance measures for basic events(BEs), and for components with receiving some users' input. However, generally, importance measures for systems are not automatically supplied by the software, but require the users' manual work. In this paper, the method how to get system importance measures is described using AIMS, and the characteristics of system importance measures in SMART are described

  17. Replacing Recipe Realism

    OpenAIRE

    Saatsi, J

    2017-01-01

    Many realist writings exemplify the spirit of ‘recipe realism’. Here I characterise recipe realism, challenge it, and propose replacing it with ‘exemplar realism’. This alternative understanding of realism is more piecemeal, robust, and better in tune with scientists’ own attitude towards their best theories, and thus to be preferred.

  18. Estimating the shear strength of concrete with coarse aggregate replacement

    OpenAIRE

    Folagbade Olusoga Peter ORIOLA; George MOSES; Jacob Oyeniyi AFOLAYAN; John Engbonye SANI

    2017-01-01

    For economic, environmental and practical reasons, it is desirable to replace the constituents of concrete with wastes and cheaper alternative materials. However, it is best when such replacements are done at optimum replacement levels. In view of this, a laboratory investigative test was carried out to evaluate the shear strength of concrete with coarse aggregate replacement by Coconut Shell and by Waste Rubber Tyre. The coarse aggregate replacement was done at recommended optimum proportion...

  19. Differences in the stress distribution in the distal femur between patellofemoral joint replacement and total knee replacement: a finite element study

    Directory of Open Access Journals (Sweden)

    van Jonbergen Hans-Peter W

    2012-06-01

    Full Text Available Abstract Background Patellofemoral joint replacement is a successful treatment option for isolated patellofemoral osteoarthritis. However, results of later conversion to total knee replacement may be compromised by periprosthetic bone loss. Previous clinical studies have demonstrated a decrease in distal femoral bone mineral density after patellofemoral joint replacement. It is unclear whether this is due to periprosthetic stress shielding. The main objective of the current study was to evaluate the stress shielding effect of prosthetic replacement with 2 different patellofemoral prosthetic designs and with a total knee prosthesis. Methods We developed a finite element model of an intact patellofemoral joint, and finite element models of patellofemoral joint replacement with a Journey PFJ prosthesis, a Richards II prosthesis, and a Genesis II total knee prosthesis. For each of these 4 finite element models, the average Von Mises stress in 2 clinically relevant regions of interest were evaluated during a simulated squatting movement until 120 degrees of flexion. Results During deep knee flexion, in the anterior region of interest, the average Von Mises stress with the Journey PFJ design was comparable to the physiological knee, while reduced by almost 25% for both the Richards II design and the Genesis II total knee joint replacement design. The average Von Mises stress in the supracondylar region of interest was similar for both patellofemoral prosthetic designs and the physiological model, with slightly lower stress for the Genesis II design. Conclusions Patellofemoral joint replacement results in periprosthetic stress-shielding, although to a smaller degree than in total knee replacement. Specific patellofemoral prosthetic design properties may result in differences in femoral stress shielding.

  20. Differences in the stress distribution in the distal femur between patellofemoral joint replacement and total knee replacement: a finite element study

    Science.gov (United States)

    2012-01-01

    Background Patellofemoral joint replacement is a successful treatment option for isolated patellofemoral osteoarthritis. However, results of later conversion to total knee replacement may be compromised by periprosthetic bone loss. Previous clinical studies have demonstrated a decrease in distal femoral bone mineral density after patellofemoral joint replacement. It is unclear whether this is due to periprosthetic stress shielding. The main objective of the current study was to evaluate the stress shielding effect of prosthetic replacement with 2 different patellofemoral prosthetic designs and with a total knee prosthesis. Methods We developed a finite element model of an intact patellofemoral joint, and finite element models of patellofemoral joint replacement with a Journey PFJ prosthesis, a Richards II prosthesis, and a Genesis II total knee prosthesis. For each of these 4 finite element models, the average Von Mises stress in 2 clinically relevant regions of interest were evaluated during a simulated squatting movement until 120 degrees of flexion. Results During deep knee flexion, in the anterior region of interest, the average Von Mises stress with the Journey PFJ design was comparable to the physiological knee, while reduced by almost 25% for both the Richards II design and the Genesis II total knee joint replacement design. The average Von Mises stress in the supracondylar region of interest was similar for both patellofemoral prosthetic designs and the physiological model, with slightly lower stress for the Genesis II design. Conclusions Patellofemoral joint replacement results in periprosthetic stress-shielding, although to a smaller degree than in total knee replacement. Specific patellofemoral prosthetic design properties may result in differences in femoral stress shielding. PMID:22704638

  1. Strategic vehicle fleet management - the replacement problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2016-03-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the third one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Material and methods: The paper discusses ways of building replacement strategies for companies' fleets of vehicles. It means deciding for how long to exploit particular vehicles in a fleet (the fleet replacement problem - FR. The essence of this problem lies in the minimization of vehicle / fleet exploitation costs by balancing ownership and utilization costs and taking into account budget limitations. In the paper an original mathematical model (an optimization method allowing for the FR analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows that there exist optimal exploitation periods of particular vehicles in a fleet. However, combination of them gives a replacement plan for an entire fleet violating budget constraints. But it is possible to adjust individual age to replacement of particular vehicles to fulfill budget constraints without losing economical optimality of a developed replacement plan for an entire fleet. Conclusions: The paper is the last one of a series of three papers that the author dedicated to the strategic vehicle fleet management topic including the following managerial decision problems: MAKE-or-BUY, sizing / composition and replacement.

  2. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Science.gov (United States)

    2010-10-01

    ... equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT... Special Items 908.7112 Materials handling equipment replacement standards. Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405...

  3. Postmenopausal hormone replacement therapy--clinical implications

    DEFF Research Database (Denmark)

    Ravn, S H; Rosenberg, J; Bostofte, E

    1994-01-01

    The menopause is defined as cessation of menstruation, ending the fertile period. The hormonal changes are a decrease in progesterone level, followed by a marked decrease in estrogen production. Symptoms associated with these hormonal changes may advocate for hormonal replacement therapy....... This review is based on the English-language literature on the effect of estrogen therapy and estrogen plus progestin therapy on postmenopausal women. The advantages of hormone replacement therapy are regulation of dysfunctional uterine bleeding, relief of hot flushes, and prevention of atrophic changes...... in the urogenital tract. Women at risk of osteoporosis will benefit from hormone replacement therapy. The treatment should start as soon after menopause as possible and it is possible that it should be maintained for life. The treatment may be supplemented with extra calcium intake, vitamin D, and maybe calcitonin...

  4. THE REPLACEMENT-RENEWAL OF INDUSTRIAL EQUIPMENTS. THE MAPI FORMULAS

    Directory of Open Access Journals (Sweden)

    Meo Colombo Carlotta

    2010-07-01

    Full Text Available Since the production has been found to be an economical means for satisfying human wants, this process requires a complex industrial organization together with a large investment in equipments, plants and productive systems. These productive systems are employed to alter the physical environment and create consumer goods. As a result, they are consumed or become obsolete, inadequate, or otherwise candidates for replacement. When replacement is being considered, two assets must be evaluated: the present asset, the defender and its potential replacement, the challenger. Since the success of an industrial organization depends upon profit, replacement should generally occur if an economic advantage will result. Whatever the reason leading to the consideration of replacement, the analysis and decisions must be based upon estimates of what will occur in the future. In this paper we present the Mapi algorithm as a procedure for evaluating investments or for analyzing replacement opportunities.

  5. A useful framework for optimal replacement models

    International Nuclear Information System (INIS)

    Aven, Terje; Dekker, Rommert

    1997-01-01

    In this note we present a general framework for optimization of replacement times. It covers a number of models, including various age and block replacement models, and allows a uniform analysis for all these models. A relation to the marginal cost concept is described

  6. Adjacent level effects of bi level disc replacement, bi level fusion and disc replacement plus fusion in cervical spine--a finite element based study.

    Science.gov (United States)

    Faizan, Ahmad; Goel, Vijay K; Biyani, Ashok; Garfin, Steven R; Bono, Christopher M

    2012-03-01

    Studies delineating the adjacent level effect of single level disc replacement systems have been reported in literature. The aim of this study was to compare the adjacent level biomechanics of bi-level disc replacement, bi-level fusion and a construct having adjoining level disc replacement and fusion system. In total, biomechanics of four models- intact, bi level disc replacement, bi level fusion and fusion plus disc replacement at adjoining levels- was studied to gain insight into the effects of various instrumentation systems on cranial and caudal adjacent levels using finite element analysis (73.6N+varying moment). The bi-level fusion models are more than twice as stiff as compared to the intact model during flexion-extension, lateral bending and axial rotation. Bi-level disc replacement model required moments lower than intact model (1.5Nm). Fusion plus disc replacement model required moment 10-25% more than intact model, except in extension. Adjacent level motions, facet loads and endplate stresses increased substantially in the bi-level fusion model. On the other hand, adjacent level motions, facet loads and endplate stresses were similar to intact for the bi-level disc replacement model. For the fusion plus disc replacement model, adjacent level motions, facet loads and endplate stresses were closer to intact model rather than the bi-level fusion model, except in extension. Based on our finite element analysis, fusion plus disc replacement procedure has less severe biomechanical effects on adjacent levels when compared to bi-level fusion procedure. Bi-level disc replacement procedure did not have any adverse mechanical effects on adjacent levels. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. A comparison of minimally invasive and standard aortic valve replacement.

    Science.gov (United States)

    Stoliński, Jarosław; Plicner, Dariusz; Grudzień, Grzegorz; Wąsowicz, Marcin; Musiał, Robert; Andres, Janusz; Kapelak, Bogusław

    2016-10-01

    The study objective was to compare aortic valve replacement through a right anterior minithoracotomy with aortic valve replacement through a median sternotomy. With propensity score matching, we selected 211 patients after aortic valve replacement through a right anterior minithoracotomy and 211 patients after aortic valve replacement who underwent operation between January 2010 and December 2013. Perioperative outcomes were analyzed, and multivariable logistic regression analysis of risk factors of postoperative morbidity was performed. For propensity score-matched patients, hospital mortality was 1.0% in the aortic valve replacement through a right anterior minithoracotomy group and 1.4% in the aortic valve replacement group (P = 1.000). Stroke occurred in 0.5% versus 1.4% (P = .615), myocardial infarction occurred in 1.4% versus 1.9% (P = 1.000), and new onset of atrial fibrillation occurred in 12.8% versus 24.2% (P = .003) of patients in the aortic valve replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Postoperative drainage was 353.5 ± 248.6 mL versus 544.3 ± 324.5 mL (P replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Mediastinitis occurred in 2.8% of patients after aortic valve replacement and in 0.0% of patients after aortic valve replacement through a right anterior minithoracotomy surgery (P = .040). Intensive care unit stay (1.3 ± 1.2 days vs 2.6 ± 2.6 days) and hospital stay (5.7 ± 1.6 days vs 8.7 ± 4.4 days) were statistically significantly shorter in the aortic valve replacement through a right anterior minithoracotomy group. Aortic valve replacement through a right anterior minithoracotomy surgery resulted in reduced postoperative morbidity (odds ratio, 0.4; P replacement through a right anterior minithoracotomy surgery resulted in a reduced infection rate, diminished postoperative bleeding and blood

  8. Rehabilitation after total joint replacement: a scoping study.

    Science.gov (United States)

    L Snell, Deborah; Hipango, Julia; Sinnott, K Anne; Dunn, Jennifer A; Rothwell, Alastair; Hsieh, C Jean; DeJong, Gerben; Hooper, Gary

    2018-07-01

    The evidence supporting rehabilitation after joint replacement, while vast, is of variable quality making it difficult for clinicians to apply the best evidence to their practice. We aimed to map key issues for rehabilitation following joint replacement, highlighting potential avenues for new research. We conducted a scoping study including research published between January 2013 and December 2016, evaluating effectiveness of rehabilitation following hip and knee total joint replacement. We reviewed this work in the context of outcomes described from previously published research. Thirty individual studies and seven systematic reviews were included, with most research examining the effectiveness of physiotherapy-based exercise rehabilitation after total knee replacement using randomized control trial methods. Rehabilitation after hip and knee replacement whether carried out at the clinic or monitored at home, appears beneficial but type, intensity and duration of interventions were not consistently associated with outcomes. The burden of comorbidities rather than specific rehabilitation approach may better predict rehabilitation outcome. Monitoring of recovery and therapeutic attention appear important but little is known about optimal levels and methods required to maximize outcomes. More work exploring the role of comorbidities and key components of therapeutic attention and the therapy relationship, using a wider range of study methods may help to advance the field. Implications for Rehabilitation Physiotherapy-based exercise rehabilitation after total hip replacement and total knee replacement, whether carried out at the clinic or monitored at home, appears beneficial. Type, intensity, and duration of interventions do not appear consistently associated with outcomes. Monitoring a patient's recovery appears to be an important component. The available research provides limited guidance regarding optimal levels of monitoring needed to achieve gains following hip

  9. 21 CFR 870.3710 - Pacemaker repair or replacement material.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Pacemaker repair or replacement material. 870.3710... (CONTINUED) MEDICAL DEVICES CARDIOVASCULAR DEVICES Cardiovascular Prosthetic Devices § 870.3710 Pacemaker repair or replacement material. (a) Identification. A pacemaker repair or replacement material is an...

  10. Tool Inventory and Replacement

    Science.gov (United States)

    Bear, W. Forrest

    1976-01-01

    Vocational agriculture teachers are encouraged to evaluate curriculum offerings, the new trends in business and industry, and develop a master tool purchase and replacement plan over a 3- to 5-year period. (HD)

  11. Multi-stage type replacing method of iodine filter

    International Nuclear Information System (INIS)

    Kitamura, Masao; Kamiya, Kunio.

    1976-01-01

    Object: To effectively replace a filter into a removing device of radioactive impurities used in ventilation and air conditioning system or the like in an atomic power plant. Structure: A plurality of elements of a filter are arranged in series relative to fluid. In the first replacement, an ante-filter-element on inlet side of fluid is removed, and a post-filter-element is repositioned to that position of the ante-element. Then, a fresh element is newly mounted on that position of the post-element. Replacement after the second time may be effected by repeating the operation noted above. With this arrangement, the minimal value of collection efficiency at replacement of filter may be increased. (Ikeda, J.)

  12. Property Assessment of Sponge Cake Added with Egg Replacer

    OpenAIRE

    Yaqiang He; Linlin Wang; Qian Lu

    2015-01-01

    Chicken egg which is always used in sponge cake production is likely to deteriorate during storage or transportation. This weakness prevents the wide use of chicken egg in sponge cake making. In order to solve this problem, egg replacer has been developed. In this study, effect of egg replacer on the property of sponge cake was analyzed. The result indicated egg replacer could improve the yield rate and specific volume of sponge cake. However, high content of egg replacer would negatively imp...

  13. Hip joint replacement - slideshow

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/presentations/100006.htm Hip joint replacement - series—Normal anatomy To use the ... to slide 5 out of 5 Overview The hip joint is made up of two major parts: ...

  14. Principles of human joint replacement design and clinical application

    CERN Document Server

    Buechel, Frederick F

    2015-01-01

    This book is written for the users and designers of joint replacements. In its second extended edition it conveys to the reader the knowledge accumulated by the authors during their forty year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter describes the design methodology now required for joint replacement in the USA and EU countries. The remaining chapters provide a history of joint replacement, an evaluation of earlier and current devices and sample case hist...

  15. Principles of Human Joint Replacement Design and Clinical Application

    CERN Document Server

    Buechel, Frederick F

    2012-01-01

    Drs. Buechel, an orthopaedic surgeon, and Pappas, a professor of Mechanical Engineering, are the designers of several successful joint replacement systems. The most well-known of these is the pioneering LCS knee replacement. They have written this book for the users and designers of joint replacements. It is an attempt to convey to the reader the knowledge accumulated by the authors during their thirty five year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter de...

  16. Mitochondrial replacement techniques: egg donation, genealogy and eugenics

    OpenAIRE

    Palacios-Gonz?lez, C?sar

    2016-01-01

    Several objections against the morality of researching or employing mitochondrial replacement techniques have been advanced recently. In this paper, I examine three of these objections and show that they are found wanting. First I examine whether mitochondrial replacement techniques, research and clinical practice, should not be carried out because of possible harms to egg donors. Next I assess whether mitochondrial replacement techniques should be banned because they could affect the study o...

  17. Steam generator replacement from ALARA aspects

    International Nuclear Information System (INIS)

    Terry, I.; Breznik, B.

    2003-01-01

    This paper is going to consider radiological related parameters important for steam generator replacement (SGR) implementation. These parameters are identified as ALARA related parameters, owner-contractor relationship, planning, health physics with logistic services, and time required for the replacement. ALARA related parameters such as source or initial dose rate and plant system configuration define the initial conditions for the planning. There is room to optimise work planning. managerial procedures and also the staff during the implementation phase. The overview of these general considerations is based on the following background: using internationally available data and the experience of one of the vendors, i.e. Siemens-Framatome, and management experience of SG replacement which took place at Krsko NPP in the spring of 2000. Generally plant decisions on maintenance or repair procedures under radiation conditions take into account ALARA considerations. But in the main it is difficult to adjudge the results of an ALARA study, usually in the form of a collective dose estimate, because a comparison standard is missing. That is, very often the planned work is of a one-off nature so comparisons are not possible or the scopes are not the same. In such a case the collective doses for other types of work are looked at and a qualitative evaluation is made. In the case of steam generator replacement this is not the case. Over years of steam generator replacements world-wide a standard has been developed gradually. The first part of the following displays an overview of SGR and sets the Krsko SGR in perspective by applying dose analysis. The second part concentrates on the Krsko SGR itself and its ALARA aspects. (authors)

  18. Steam generator replacement: a story of continuous improvement

    International Nuclear Information System (INIS)

    Sills, M.S.; Wilkerson, R.

    2009-01-01

    This paper provides a review of the history of steam generator replacement in the US focusing on the last five years. From the early replacements in the 1980s, there have been major technology improvements resulting in dramatically shorter outages and reduced radiological exposure for workers. Even though the changes for the last five years have been less dramatic, the improvement trend continues. No two steam generator replacement (SGR) projects are the same and there are some major differences including; the access path for the components to containment (is a construction opening in containment required), type of containment, number of steam generators, one piece or two piece replacement, plant type (Westinghouse, CE or B and W) and plant layout. These differences along with other variables such as delays due to plant operations and other activities not related to the steam generator replacement make analysis of performance data difficult. However, trends in outage performance and owner expectations can be identified. How far this trend will go is also discussed. Along with the trend of improved performance, there is also a significant variation in performance. Some of the contributors to this variation are identified. This paper addresses what is required for a successful outage, meeting the increasing expectations and setting new records. The authors will discuss various factors that contribute to the success of a steam generator replacement. These factors include technical issues and, equally important, organizational interface and the role the customer plays. Recommendations are provided for planning a successful steam generator replacement outage. (author)

  19. Solid-State Thyratron Replacement. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Roth, Ian [Diversified Technologies, Inc., Bedford, MA

    2017-12-12

    Under this SBIR, DTI developed a solid-state switch as an alternative to legacy thyratron equipment. Our Phase II objective was to make a solid-state thyratron replacement that would provide equivalent or better performance, much higher reliability (at least a 20 year lifetime, compared to a thyratron’s two-year lifetime) and would sell for ~3x the cost of a thyratron, or less than $40k. We were successful in building a solid-state switch which could reliably function as a thyratron replacement. The unit was designed to directly replace the thyratrons currently being used at SLAC’s Linac Coherent Light Source (LCLS), and was built in a tank that was small enough to fit into the existing thyratron cabinet, providing a true form-fit-function replacement path. We tested the switch at the full operating specifications: 48 kV, 6.3 kA, and 1 µs risetime. We also demonstrated a peak-to-peak pulse jitter of 1.5 ns, which is five times shorter than is typical for thyratrons. This lower jitter would improve the performance of the LCLS beam. The predicted reliability is more than 80 years, which is 40 times greater than a thyratron.

  20. 48 CFR 908.7101-4 - Replacement of motor vehicles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Replacement of motor....7101-4 Replacement of motor vehicles. (a) The replacement of motor vehicles shall be in accordance with... Heads of Contracting Activities may arrange to sell, as exchange sales, used motor vehicles being...

  1. Slab replacement maturity guidelines.

    Science.gov (United States)

    2014-04-01

    This study investigated the use of maturity method to determine early age strength of concrete in slab : replacement application. Specific objectives were (1) to evaluate effects of various factors on the compressive : maturity-strength relationship ...

  2. REPLACEMENT IN RABBIT HERDS: A REVIEW

    Directory of Open Access Journals (Sweden)

    Ibrahim F.M. Marai

    2010-08-01

    Full Text Available Doe rabbit's replacement constitutes the annual renewal rate of new breeders that must be incorporated into the production stock. Criterion for culling non-productive animals differs significantly among fryer production colonies, foundation stocks and a colony with continuous enzootic disease or continuous malnourishment. In commercial rabbit production, good management improves the health and productivity of the entire herd, by reducing the all-time high replacement rates and improving economic viability. In the present article, a comprehensive review of numerous experiences in the rabbit production field of different countries, was presented. Basic recommendations for professional breeders were highlighted, covering critical issues such as the need for continuously upgrading the health status of the colony, the positive effect of   genetic selection and the nutritional conditioning and special treatment of young does being groomed as future replacements.

  3. Strategies for replacement of obsolete equipment - including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2000-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of: commercially available equivalent component; modification of a commercial available component; reverse engineering of the original component; and finally, design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: Missing, misleading or no information on the original component; Acquiring information from the original equipment manufacturer and the plant; Using a sample component for the replacement evaluation and or reverse engineering; and Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  4. Peptide nucleic acid probe for protein affinity purification based on biotin-streptavidin interaction and peptide nucleic acid strand hybridization.

    Science.gov (United States)

    Tse, Jenny; Wang, Yuanyuan; Zengeya, Thomas; Rozners, Eriks; Tan-Wilson, Anna

    2015-02-01

    We describe a new method for protein affinity purification that capitalizes on the high affinity of streptavidin for biotin but does not require dissociation of the biotin-streptavidin complex for protein retrieval. Conventional reagents place both the selectively reacting group (the "warhead") and the biotin on the same molecule. We place the warhead and the biotin on separate molecules, each linked to a short strand of peptide nucleic acid (PNA), synthetic polymers that use the same bases as DNA but attached to a backbone that is resistant to attack by proteases and nucleases. As in DNA, PNA strands with complementary base sequences hybridize. In conditions that favor PNA duplex formation, the warhead strand (carrying the tagged protein) and the biotin strand form a complex that is held onto immobilized streptavidin. As in DNA, the PNA duplex dissociates at moderately elevated temperature; therefore, retrieval of the tagged protein is accomplished by a brief exposure to heat. Using iodoacetate as the warhead, 8-base PNA strands, biotin, and streptavidin-coated magnetic beads, we demonstrate retrieval of the cysteine protease papain. We were also able to use our iodoacetyl-PNA:PNA-biotin probe for retrieval and identification of a thiol reductase and a glutathione transferase from soybean seedling cotyledons. Copyright © 2014 Elsevier Inc. All rights reserved.

  5. Age replacement policy based on imperfect repair with random probability

    International Nuclear Information System (INIS)

    Lim, J.H.; Qu, Jian; Zuo, Ming J.

    2016-01-01

    In most of literatures of age replacement policy, failures before planned replacement age can be either minimally repaired or perfectly repaired based on the types of failures, cost for repairs and so on. In this paper, we propose age replacement policy based on imperfect repair with random probability. The proposed policy incorporates the case that such intermittent failure can be either minimally repaired or perfectly repaired with random probabilities. The mathematical formulas of the expected cost rate per unit time are derived for both the infinite-horizon case and the one-replacement-cycle case. For each case, we show that the optimal replacement age exists and is finite. - Highlights: • We propose a new age replacement policy with random probability of perfect repair. • We develop the expected cost per unit time. • We discuss the optimal age for replacement minimizing the expected cost rate.

  6. A single - item replacement decision model for repairable spare ...

    African Journals Online (AJOL)

    In this paper, we present an analytical method for determining spare parts replacement over an infinite planning horizon. (The objective is to minimize the total system cost). We develop an exact and simple method for determining the time for equipment replacement or making decision about when to replace equipments, ...

  7. An abstract machine model of dynamic module replacement

    OpenAIRE

    Walton, Chris; Kırlı, Dilsun; Gilmore, Stephen

    2000-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement for the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection. We show how the operation of module replacement could be applied to other garbage-collected languages such as Java.

  8. Nonparametric adaptive age replacement with a one-cycle criterion

    International Nuclear Information System (INIS)

    Coolen-Schrijner, P.; Coolen, F.P.A.

    2007-01-01

    Age replacement of technical units has received much attention in the reliability literature over the last four decades. Mostly, the failure time distribution for the units is assumed to be known, and minimal costs per unit of time is used as optimality criterion, where renewal reward theory simplifies the mathematics involved but requires the assumption that the same process and replacement strategy continues over a very large ('infinite') period of time. Recently, there has been increasing attention to adaptive strategies for age replacement, taking into account the information from the process. Although renewal reward theory can still be used to provide an intuitively and mathematically attractive optimality criterion, it is more logical to use minimal costs per unit of time over a single cycle as optimality criterion for adaptive age replacement. In this paper, we first show that in the classical age replacement setting, with known failure time distribution with increasing hazard rate, the one-cycle criterion leads to earlier replacement than the renewal reward criterion. Thereafter, we present adaptive age replacement with a one-cycle criterion within the nonparametric predictive inferential framework. We study the performance of this approach via simulations, which are also used for comparisons with the use of the renewal reward criterion within the same statistical framework

  9. 16 CFR 501.3 - Replacement bags for vacuum cleaners.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Replacement bags for vacuum cleaners. 501.3... REQUIREMENTS AND PROHIBITIONS UNDER PART 500 § 501.3 Replacement bags for vacuum cleaners. Replacement bags for..., provided: (a) The quantity of contents is expressed in terms of numerical count of the bags; (b) A...

  10. Replacement Value of fermented millet ( Pennisetum americanum ...

    African Journals Online (AJOL)

    The replacement value of fermented millet for maize in the diets of Clarias gariepinus fingerlings reared in a recirculation system was determined. Five isonitrogenous diets were formulated to contain graded levels of fermented millet meal replacing 0, 20, 40, 60 and 80% of maize and fed to triplicate groups of fingerlings ...

  11. 41 CFR 51-6.14 - Replacement services.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Replacement services. 51-6.14 Section 51-6.14 Public Contracts and Property Management Other Provisions Relating to Public... § 51-6.14 Replacement services. If a service is on the Procurement List to meet the needs of a...

  12. REPLACEMENT CONTROL OF INNOVATION MANAGERS: ORGANIZATIONAL AND ECONOMIC ASPECTS

    Directory of Open Access Journals (Sweden)

    E. V. Gurina

    2011-01-01

    Full Text Available The paper substantiates phases of specialists’ replacement ensuring innovation development of the national economy in Belarus, i.e. managers of innovation activity. Realization of replacement phases is presented within the system consisting of four blocks – objective, managing, controllable and providing. Analysis results of the current state of the innovation activity managers replacement system reveal main problems in interaction of its basic agents. The paper considers solution of specified problems in the context of formation of organizational and economic approaches to managing the innovation activity managers replacement system which presupposes modernization of organizational interrelations between state- run public authorities in the managing block and micro-incentive structures in the controllable block as well as the usage of the process approach in every phase of the replacement process. 

  13. Technical development and its application on steam generator replacement

    International Nuclear Information System (INIS)

    Morita, Sadahiko; Hanzawa, Katsumi; Sato, Hajime; Kannoto, Yasuo.

    1995-01-01

    Twenty-two PWR nuclear power plants are now under commercial operation in Japan. Eight of these plants are scheduled to have their steam generators replaced by up-graded units as a social responsibility for improved reliability, economy and easier maintenance. To carry out steam generator replacement, main coolant pipe cutting and restoration techniques, remote controlled welding machines and other remote controlled equipment, templating techniques with which the new steam generator primary nozzles will fit the existing primary pipes correctly were developed. An adequate training program was carried out to establish these techniques and they were then applied in replacement work on site. The steam generators of the three plants were replaced completely in 1994. These newly developed techniques are to be applied in upcoming plants and replaced plants will be much reliable. (author)

  14. Reoperative aortic root replacement: Outcome in a contemporary series.

    Science.gov (United States)

    Esaki, Jiro; Leshnower, Bradley G; Binongo, Jose N; Lasanajak, Yi; McPherson, LaRonica; Thourani, Vinod H; Chen, Edward P

    2017-09-01

    Reoperative aortic root replacement is a challenging procedure associated with significant mortality and morbidity. The purpose of this study was to investigate the outcomes of reoperative aortic root replacement when performed in a number of complex clinical settings and to identify risk factors for operative mortality and long-term survival. From 2006 to 2015, 280 consecutive patients at an academic center underwent reoperative aortic root replacement after a variety of previous aortic or cardiac operations. Logistic regression and extended Cox proportional hazards regression analyses were used to determine risk factors for operative mortality and long-term survival, respectively. The mean age of patients was 52.5 ± 14.1 years. Prior operations included proximal aortic replacement in 113 patients, valve surgery in 162 patients, and coronary artery bypass grafting in 46 patients. Concomitant procedures included arch replacement in 135 patients, coronary artery bypass grafting in 68 patients, and mitral valve repair/replacement in 18 patients. Operative mortality was 14.3%. Five-year survival was 74.0%. Univariable analysis did not find previous root replacement, prior proximal aortic surgery, and concomitant arch replacement to be risk factors for operative mortality. In the multivariable analysis, chronic lung disease, prior myocardial infarction, and concomitant mitral valve surgery were risk factors for operative mortality. Age, peripheral artery disease, emergency, and concomitant mitral valve surgery were risk factors for mortality in the late phase. Reoperative aortic root replacement represents complex procedures carrying significant morbidity and mortality. Chronic lung disease, prior myocardial infarction, and concomitant mitral valve surgery were risk factors for operative mortality. Age, peripheral artery disease, emergency, and concomitant mitral valve surgery were risk factors for long-term mortality. Copyright © 2017 The American Association for

  15. Strategies for replacement of obsolete equipment, including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of, (1) commercially available equivalent component, (2) modification of a commercial available component, (3) reverse engineering of the original component and finally (4) design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: 1) Missing, misleading or no information on the original component. 2) Acquiring information from the original equipment manufacturer and the plant. 3) Using a sample component for the replacement evaluation and or reverse engineering. 4) Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  16. BWR control blade replacement strategies

    Energy Technology Data Exchange (ETDEWEB)

    Kennard, M W [Stoller Nuclear Fuel, NAC International, Pleasantville, NY (United States); Harbottle, J E [Stoller Nuclear Fuel, NAC International, Thornbury, Bristol (United Kingdom)

    2000-02-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B{sub 4}C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  17. BWR control blade replacement strategies

    International Nuclear Information System (INIS)

    Kennard, M.W.; Harbottle, J.E.

    2000-01-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B 4 C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  18. The caudal septum replacement graft.

    Science.gov (United States)

    Foda, Hossam M T

    2008-01-01

    To describe a technique for reconstructing the lost tip support in cases involving caudal septal and premaxillary deficiencies. The study included 120 patients with aesthetic and functional nasal problems resulting from the loss of caudal septal and premaxillary support. An external rhinoplasty approach was performed to reconstruct the lost support using a cartilaginous caudal septum replacement graft and premaxillary augmentation with Mersilene mesh. The majority of cases (75%) involved revisions in patients who had previously undergone 1 or more nasal surgical procedures. A caudal septum replacement graft was combined with premaxillary augmentation in 93 patients (77.5%). The mean follow-up period was 3 years (range, 1-12 years). The technique succeeded in correcting the external nasal deformities in all patients and resulted in a significant improvement in breathing in 74 patients (86%) with preoperative nasal obstruction. There were no cases of infection, displacement, or extrusion. The caudal septum replacement graft proved to be very effective in restoring the lost tip support in patients with caudal septal deficiency. Combining the graft with premaxillary augmentation using Mersilene mesh helped increase support and stability over long-term follow-up.

  19. Results of Austin Moore replacement.

    Directory of Open Access Journals (Sweden)

    Jadhav A

    1996-04-01

    Full Text Available Forty cases of Austin Moore Replacement done for transcervical fractures of the femur in patients were reviewed after a period of 12 to 48 months postoperatively (mean 26 mth. 30 cases (75% had mild to severe pain of non-infective origin, starting as early as 6 months postoperatively. This was irrespective of the make, size or position (varus/valgus of the prosthesis. Though the Aufranc and Sweet clinical scoring was satisfactory in 65% cases, radiological evidence of complications like sinking, protrusion, etc. were seen in majority of the cases. Calcar resorption was seen in 34 cases (85% as early as 4 months postoperatively. Results of THR and bipolar replacement done for transcervical fractures in recent literature show 85% pain-free cases at 5 years. We feel that Austin Moore Replacement should be reserved for patients more than 65 years of age and those who are less active or debilitated because of other factors, because of increased acetabular wear with time in the younger individual. This is corroborated by unsatisfactory results in patients less than 65 years of age (p < 0.05.

  20. Replacement rod

    International Nuclear Information System (INIS)

    Hatfield, S.C.

    1989-01-01

    This patent describes in an elongated replacement rod for use with fuel assemblies of the type having two end fittings connected by guide tubes with a plurality of rod and guide tube cell defining spacer grids containing rod support features and mixing vanes. The grids secured to the guide tubes in register between the end fittings at spaced intervals. The fuel rod comprising: an asymmetrically beveled tip; a shank portion having a straight centerline; and a permanently diverging portion between the tip and the shank portion

  1. Replacement of the JRR-3 computer system

    Energy Technology Data Exchange (ETDEWEB)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2000-10-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  2. How to replace a reactor pressure vessel

    International Nuclear Information System (INIS)

    Huber, R.

    1996-01-01

    A potential life extending procedure for a nuclear reactor after, say, 40 years of service life, might in some circumstances be the replacement of the reactor pressure vessel. Neutron induced degradation of the vessel might make replacement by one of a different material composition desirable, for example. Although the replacement of heavy components, such as steam generators, has been possible for many years, the pressure vessel presents a much more demanding task if only because it is highly irradiated. Some preliminary feasibility studies by Siemens are reported for the two removal strategies that might be considered. These are removal of the entire pressure vessel in one piece and dismantling it into sections. (UK)

  3. Replacement of the JRR-3 computer system

    International Nuclear Information System (INIS)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu

    2000-01-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  4. Mechanical Aortic Valve Replacement in Octogenarian

    Directory of Open Access Journals (Sweden)

    Irfan Tasoglu

    2013-10-01

    Full Text Available Aim: This study analyzes the long-term outcomes of mechanical aortic valve replacement in octogenarian patients. Material and Method: A retrospective review was performed on 23 octogenarian patients who underwent mechanical aortic valve replacement. Hospital mortality, postoperative intensive care unit stay, hospital stay and long-term results was examined. Estimates of the cumulative event mortality rate were calculated by the Kaplan-Meier method. Results: The mean age of all patients was 82.9±2.3 years and most were men (65.22%. The median ejection fraction was 45%. 73.91% of patients were in New York Heart Association class III-IV. Thirteen patients (56.52% in this study underwent combined procedure, the remaining 10 (43.48% patients underwent isolated aortic valve replacement. The most common valve size was 23 mm. The mean intensive care unit stay was 1.76±1.14 days. The mean hospital stay was 9.33±5.06 days. No complications were observed in 56.52% patients during their hospital stay. The overall hospital mortality was 8.7%. Follow-up was completed for all 23 patients. Median follow-up time was 33 months (1-108 months. Actuarial survival among discharged from hospital was 59% at 5 years. Discussion: Mechanical aortic valve replacement is a safe procedure in octogenarian patients and can be performed safely even in combined procedure.

  5. Steam generator replacement at Doel 3 NPP (Belgium)

    International Nuclear Information System (INIS)

    Danhier, B.

    1993-01-01

    The reasons are presented that led to the conclusion that the most cost-effective strategy for the Doel 3 unit was the immediate replacement of the SG. Discussed are the advantages and drawbacks of the replacement techniques, the so-called 2, 3 and 4 cuts methods. The advantages are emphasized of intensive use of computer aided engineering in this kind of backfitting. The methodology applied to combine a power uprating of 10% over the nominal power with the steam generator replacement is presented. (author) 1 fig

  6. Optimal Overhaul-Replacement Policies for Repairable Machine Sold with Warranty

    Directory of Open Access Journals (Sweden)

    Kusmaningrum Soemadi

    2014-12-01

    Full Text Available This research deals with an overhaul-replacement policy for a repairable machine sold with Free Replacement Warranty (FRW. The machine will be used for a finite horizon, T (T <, and evaluated at a fixed interval, s (s< T. At each evaluation point, the buyer considers three alternative decisions i.e. Keep the machine, Overhaul it, or Replace it with a new identical one. An overhaul can reduce the machine age virtually, but not to a point that the machine is as good as new. If the machine fails during the warranty period, it is rectified at no cost to the buyer. Any failure occurring before and after the expiry of the warranty is restored by minimal repair. An overhaul-replacement policy is formulated for such machines by using dynamic programming approach to obtain the buyer’s optimal policy. The results show that a significant rejuvenation effect due to overhaul may extend the length of machine life cycle and delay the replacement decision. In contrast, the warranty stimulates early machine replacement and by then increases the replacement frequencies for a certain range of replacement cost. This demonstrates that to minimize the total ownership cost over T the buyer needs to consider the minimal repair cost reduction due to rejuvenation effect of overhaul as well as the warranty benefit due to replacement. Numerical examples are presented for both illustrating the optimal policy and describing the behavior of the optimal solution.

  7. [Update in continuous renal replacement techniques].

    Science.gov (United States)

    Romero-García, M; de la Cueva-Ariza, L; Delgado-Hito, P

    2013-01-01

    Acute renal failure affects 25% of patients hospitalized in intensive care units. Despite technological advances, the mortality of these patients is still high due to its associated complications. Continuous renal replacement techniques are one of the treatments for acute renal failure because they make it possible to treat the complications and decrease mortality. The nurse's knowledge and skills regarding these techniques will be decisive for the success of the therapy. Consequently, the nurse's experience and training are key components. The objective of this article is to update the knowledge on continuous renal replacement techniques. Keeping this in mind, a review has been made of the physical and chemical principles such as diffusion and convection, among others. A description of the different continuous renal replacement techniques, a presentation of the main vascular access, and a description of the nursing cares and complications related to techniques used have also been provided. Copyright © 2012 Elsevier España, S.L. y SEEIUC. All rights reserved.

  8. Replacement of Mushroom Cage Gastrostomy Tube Using a Modified Technique to Allow Percutaneous Replacement with an Endoscopic Tube in Patients with Amyotrophic Lateral Sclerosis

    International Nuclear Information System (INIS)

    Ammar, Thoraya; Rio, Alan; Ampong, Mary Ann; Sidhu, Paul S.

    2010-01-01

    Radiologic inserted gastrostomy (RIG) is the preferred method in our institution for enteral feeding in amyotrophic lateral sclerosis (ALS). Skin-level primary-placed mushroom cage gastrostomy tubes become tight with weight gain. We describe a minimally invasive radiologic technique for replacing mushroom gastrostomy tubes with endoscopic mushroom cage tubes in ALS. All patients with ALS who underwent replacement of a RIG tube were included. Patients were selected for a modified replacement when the tube length of the primary placed RIG tube was insufficient to allow like-for-like replacement. Replacement was performed under local anesthetic and fluoroscopic guidance according to a preset technique, with modification of an endoscopic mushroom cage gastrostomy tube to allow percutaneous placement. Assessment of the success, safety, and durability of the modified technique was undertaken. Over a 60-month period, 104 primary placement mushroom cage tubes in ALS were performed. A total of 20 (19.2%) of 104 patients had a replacement tube positioned, 10 (9.6%) of 104 with the modified technique (male n = 4, female n = 6, mean age 65.5 years, range 48-85 years). All tubes were successfully replaced using this modified technique, with two minor complications (superficial wound infection and minor hemorrhage). The mean length of time of tube durability was 158.5 days (range 6-471 days), with all but one patient dying with a functional tube in place. We have devised a modification to allow percutaneous replacement of mushroom cage gastrostomy feeding tubes with minimal compromise to ALS patients. This technique allows tube replacement under local anesthetic, without the need for sedation, an important consideration in ALS.

  9. Dead pixel replacement in LWIR microgrid polarimeters.

    Science.gov (United States)

    Ratliff, Bradley M; Tyo, J Scott; Boger, James K; Black, Wiley T; Bowers, David L; Fetrow, Matthew P

    2007-06-11

    LWIR imaging arrays are often affected by nonresponsive pixels, or "dead pixels." These dead pixels can severely degrade the quality of imagery and often have to be replaced before subsequent image processing and display of the imagery data. For LWIR arrays that are integrated with arrays of micropolarizers, the problem of dead pixels is amplified. Conventional dead pixel replacement (DPR) strategies cannot be employed since neighboring pixels are of different polarizations. In this paper we present two DPR schemes. The first is a modified nearest-neighbor replacement method. The second is a method based on redundancy in the polarization measurements.We find that the redundancy-based DPR scheme provides an order-of-magnitude better performance for typical LWIR polarimetric data.

  10. Three Steam Generator Replacement Projects in 1995

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S. A. joined their experience and efforts in the field of steam generator replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 1. Further projects will follow in 1996, i. e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  11. Testosterone Replacement, Muscle Strength, and Physical Function

    Directory of Open Access Journals (Sweden)

    You-Seon Nam

    2018-05-01

    Full Text Available Muscle strength and physical function decrease in older men, as do testosterone levels. Nonetheless, the effects of testosterone replacement therapy on muscle strength and physical function remain inconclusive and equivocal. We conducted a rapid systematic review, the results of which showed that testosterone replacement does not affect muscle strength (measured by hand grip strength and leg muscle strength, although it may increase physical function (measured by the 6-minute walk test, Physical Activity Scale for the Elderly score, and other physical performance tests. However, most of the studies were conducted in the United States or Europe and did not include participants from Asian or other ethnic backgrounds; therefore, further studies are needed to evaluate the effects of testosterone replacement in a broader population.

  12. Criteria for the replacement of restorations

    DEFF Research Database (Denmark)

    Wilson, Nairn; Lynch, Christopher; Brunton, Paul Brunton

    2016-01-01

    The replacement of a restoration is one of the most common procedures in dentistry. However, the criteria for such intervention, excluding catastrophic failure and persistent discomfort and pain, continue to be the subject of considerable debate. The decision-making process remains subjective...... on the part of the treating clinician, while the evidence base for refurbishment and repair rather than replacement for the management of defective and failing restorations continues to grow and strengthen. This article, prepared as an Academy of Operative Dentistry European Section consensus publication...

  13. Differences in the stress distribution in the distal femur between patellofemoral joint replacement and total knee replacement: a finite element study

    NARCIS (Netherlands)

    van Jonbergen, H.P.; Innocenti, B.; Gervasi, G.L.; Labey, L.; Verdonschot, N.J.

    2012-01-01

    BACKGROUND: Patellofemoral joint replacement is a successful treatment option for isolated patellofemoral osteoarthritis. However, results of later conversion to total knee replacement may be compromised by periprosthetic bone loss. Previous clinical studies have demonstrated a decrease in distal

  14. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  15. 1998 researchers' conference proceedings, Amarillo College Business and Industry Center

    International Nuclear Information System (INIS)

    1998-01-01

    The first Strategic Arms Reduction Treaties (START 1 and 2) signed by the US and the Soviet Union call for a reduction in strategic nuclear warheads to about one-third of 1990 levels and a complete elimination of land-based, multiple-warhead missiles. As a consequence of dismantling nuclear warheads, a significant portion of the inventory of nuclear materials that were formerly parts of deployed weapon systems was designated to be handled and/or stored at the Pantex Plant near Amarillo, Texas. To facilitate research integration between the national laboratories and the universities, the Center has divided its technical activities into seven focus areas. For Nuclear and Other Materials Studies, the focus areas are Materials Science, Plutonium Processing and handling, Nuclear Materials Storage, and analytical Development. The Environment, Safety and Health focus areas are Environmental Restoration and Protection, Safety and Health, and Waste Management. Research projects within each area are presented

  16. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  17. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  18. Heart valve replacement with the Sorin tilting-disc prosthesis. A 10-year experience.

    Science.gov (United States)

    Milano, A; Bortolotti, U; Mazzucco, A; Mossuto, E; Testolin, L; Thiene, G; Gallucci, V

    1992-02-01

    From 1978 to 1988, 697 patients with a mean age of 48 +/- 11 years (range 5 to 75 years) received a Sorin tilting-disc prosthesis; 358 had had aortic valve replacement, 247 mitral valve replacement, and 92 mitral and aortic valve replacement. Operative mortality rates were 7.8%, 11.3%, and 10.8%, respectively, in the three groups. Cumulative duration of follow-up is 1650 patient-years for aortic valve replacement (maximum follow-up 11.4 years), 963 patient-years for mitral valve replacement (maximum follow-up 9.9 years) and 328 patient-years for mitral and aortic valve replacement (maximum follow-up 9.4 years). Actuarial survival at 9 years is 72% +/- 4% after mitral valve replacement, 70% +/- 3% after aortic valve replacement, and 50% +/- 12% after mitral and aortic valve replacement, and actuarial freedom from valve-related deaths is 97% +/- 2% after mitral valve replacement, 92% +/- 2% after aortic valve replacement, and 62% +/- 15% after mitral and aortic valve replacement. Thromboembolic events occurred in 21 patients with aortic valve replacement (1.3% +/- 0.2%/pt-yr), in 12 with mitral valve replacement (1.2% +/- 0.3% pt-yr), and in seven with mitral and aortic valve replacement (2.1% +/- 0.8%), with one case of prosthetic thrombosis in each group; actuarial freedom from thromboembolism at 9 years is 92% +/- 3% after mitral valve replacement, 91% +/- 3% after aortic valve replacement, and 74% +/- 16% after mitral and aortic valve replacement. Anticoagulant-related hemorrhage was observed in 15 patients after aortic valve replacement (0.9% +/- 0.2%/pt-yr), in 9 after mitral valve replacement (0.9% +/- 0.3%/pt-yr), and in 6 with mitral and aortic valve replacement (0.9% +/- 0.5%/pt-yr); actuarial freedom from this complication at 9 years is 94% +/- 2% after aortic valve replacement, 91% +/- 4% after mitral valve replacement, and 68% +/- 16% after mitral and aortic valve replacement. Actuarial freedom from reoperation at 9 years is 97% +/- 2% after mitral and

  19. 49 CFR 224.109 - Inspection, repair, and replacement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Inspection, repair, and replacement. 224.109 Section 224.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD..., Inspection, and Maintenance of Retroreflective Material § 224.109 Inspection, repair, and replacement. (a...

  20. Decommissioning and equipment replacement of nuclear power plants under uncertainty

    International Nuclear Information System (INIS)

    Takashima, Ryuta; Naito, Yuta; Kimura, Hiroshi; Madarame, Haruki

    2007-01-01

    This study examines the optimal timing for the decommissioning and equipment replacement of nuclear power plants. We consider that the firm has two options of decommissioning and equipment replacement, and determines to exercise these options under electricity price uncertainty. This problem is formulated as two optimal stopping problems. The solution of this model provides the value of the nuclear power plant and the threshold values for decommissioning and replacement. The dependence of decommissioning and replacement strategies on uncertainty and each cost is shown. In order to investigate the probability of events for decommissioning and replacement, Monte Carlo calculations are performed. We also show the probability distribution and the conditional expected time for each event. (author)

  1. Paired replacement fuel assemblies for BWR-type reactor

    International Nuclear Information System (INIS)

    Oguchi, Kazushige.

    1997-01-01

    There are disposed a large-diameter water rod constituting a non-boiling region at a central portion and paired replacement fuel assemblies for two streams having the same average enrichment degree and different amount of burnable poisons. The paired replacement fuel assemblies comprise a first fuel assembly having a less amount of burnable poisons and a second fuel assembly having a larger amount of burnable poisons. A number of burnable poison-containing fuel rods in adjacent with the large diameter water rod is increased in the second fuel assembly than the first fuel assembly. Then, the poison of the paired replacement fuel assemblies for the BWR type reactor can be annihilated simultaneously at the final stage of the cycle. Accordingly, fuels for a BWR type reactor excellent in economical property and safety and facilitating the design of the replacement reactor core can be obtained. (N.H.)

  2. 23 CFR 661.19 - When is a bridge eligible for replacement?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false When is a bridge eligible for replacement? 661.19... replacement? To be eligible for replacement, the bridge must be considered structurally deficient or functionally obsolete and must be in accordance with 23 CFR part 650.409(a) for bridge replacement. After an...

  3. Semantic Factors Predict the Rate of Lexical Replacement of Content Words

    OpenAIRE

    Vejdemo, Susanne; H?rberg, Thomas

    2016-01-01

    The rate of lexical replacement estimates the diachronic stability of word forms on the basis of how frequently a proto-language word is replaced or retained in its daughter languages. Lexical replacement rate has been shown to be highly related to word class and word frequency. In this paper, we argue that content words and function words behave differently with respect to lexical replacement rate, and we show that semantic factors predict the lexical replacement rate of content words. For t...

  4. Method and refrigerants for replacing existing refrigerants in centrifugal compressors

    International Nuclear Information System (INIS)

    Kopko, W.L.

    1991-01-01

    This patent describes a method for replacing an existing refrigerant in a centrifugal compressor. It comprises selecting a desired impeller Mach number for the centrifugal compressor; selecting a base refrigerant constituent; combining at least one additive refrigerant constituent with the base refrigerant constituent to form a replacement refrigerant having at least one physical or chemical property different from the existing refrigerant and substantially providing the desired impeller Mach number in the centrifugal compressor; and replacing the existing refrigerant with the replacement refrigerant

  5. Clinical study on postoperative steroid hormon replacement for preclinical Cushing's syndrome

    International Nuclear Information System (INIS)

    Furuta, Nozomu; Koide, Haruhisa; Sasaki, Hiroshi; Miki, Jun; Kimura, Takahiro; Egawa, Shin

    2009-01-01

    Diagnostic criteria for preclinical Cushing's syndrome (PCS) were reported in 1996. However, requirement of postoperative steroid hormone replacement is still controversial issue. In this study, we observed recent surgical cases retrospectively and evaluate the use of postoperative steroid hormone replacement. Eighteen patients with PCS underwent surgery from 1997 to 2007 in Jikei University Hospital. Thirteen of them received postoperative steroid hormone replacement. We investigated preoperative hormone activity by 131 I-adosterol scintigraphy and suppression of adrenocorticotropic hormone (ACTH) and evaluated the requirement of postoperative steroid hormone replacement. Preoperative serum cortisol was normal range in all patients. Serum ACTH was suppressed in 10 of them (56%). In 131 I-adosterol scintigraphy, accumulation in ipsilateral side was observed in all patients. Accumulation in contralateral side was observed in 13 patients whose serum ACTH had tendency to be suppressed. Mean period of steroid hormone replacement was 19.8 weeks. Patients with lower preoperative ACTH tended to require longer period until withdrawal of steroid hormone replacement. In addition, patients received steroid hormone replacement with higher starting dose significantly required longer period. Three of them had complications during tapering of steroid hormone. Postoperative adrenal insufficiency is important issue as postoperative management of PCS patients whose function of contralateral adrenal or pituitary gland is suppressed. 131 I-adosterol scintigraphy and preoperative serum ACTH were important factors to evaluate the requirement of postoperative steroid hormone replacement. Especially, patients with low preoperative serum ACTH tended to require long duration of postoperative steroid hormone replacement. On the other hand, patients with accumulation of contralateral side in 131 I-adosterol scintigraphy and without suppression of serum ACTH may not require steroid hormone

  6. 30 CFR 57.4203 - Extinguisher recharging or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Extinguisher recharging or replacement. 57.4203 Section 57.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Prevention and Control Firefighting Equipment § 57.4203 Extinguisher recharging or replacement. Fire...

  7. 30 CFR 56.4203 - Extinguisher recharging or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Extinguisher recharging or replacement. 56.4203 Section 56.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Prevention and Control Firefighting Equipment § 56.4203 Extinguisher recharging or replacement. Fire...

  8. Opportunity-based block replacement: the single component case

    NARCIS (Netherlands)

    R. Dekker (Rommert); E. Smeitink

    1991-01-01

    textabstractIn this paper we consider a block replacement model in which a component can be replaced preventively at maintenance opportunities only. Maintenance opportunities occur randomly and are modelled through a renewal process. In the first, theoretical part of the paper we derive an

  9. Thyroid hormone replacement therapy

    NARCIS (Netherlands)

    Wiersinga, W. M.

    2001-01-01

    Thyroid hormone replacement has been used for more than 100 years in the treatment of hypothyroidism, and there is no doubt about its overall efficacy. Desiccated thyroid contains both thyroxine (T(4)) and triiodothyronine (T(3)); serum T(3) frequently rises to supranormal values in the absorption

  10. Vascular complications associated with transcatheter aortic valve replacement.

    Science.gov (United States)

    Sardar, M Rizwan; Goldsweig, Andrew M; Abbott, J Dawn; Sharaf, Barry L; Gordon, Paul C; Ehsan, Afshin; Aronow, Herbert D

    2017-06-01

    Transcatheter aortic valve replacement (TAVR) is now an accepted pathway for aortic valve replacement for patients who are at prohibitive, severe and intermediate risk for traditional aortic valve surgery. However, with this rising uptrend and adaptation of this new technology, vascular complications and their management remain an Achilles heel for percutaneous aortic valve replacement. The vascular complications are an independent predictor of mortality for patients undergoing TAVR. Early recognition of these complications and appropriate management is paramount. In this article, we review the most commonly encountered vascular complications associated with currently approved TAVR devices and their optimal percutaneous management techniques.

  11. Replacement energy, capacity, and reliability costs for permanent nuclear reactor shutdowns

    International Nuclear Information System (INIS)

    VanKuiken, J.C., Buehring, W.A.; Hamilton, S.; Kavicky, J.A.; Cavallo, J.D.; Veselka, T.D.; Willing, D.L.

    1993-10-01

    Average replacement power costs are estimated for potential permanent shutdowns of nuclear electricity-generating units. Replacement power costs are considered to include replacement energy, capacity, and reliability cost components. These estimates were developed to assist the US Nuclear Regulatory Commission in evaluating regulatory issues that potentially affect changes in serious reactor accident frequencies. Cost estimates were derived from long-term production-cost and capacity expansion simulations of pooled utility-system operations. Factors that affect replacement power cost, such as load growth, replacement sources of generation, and capital costs for replacement capacity, were treated in the analysis. Costs are presented for a representative reactor and for selected subcategories of reactors, based on estimates for 112 individual reactors

  12. Severe Heterotopic Ossification following Total Knee Replacement

    Directory of Open Access Journals (Sweden)

    Alexander L. Dodds

    2014-01-01

    Full Text Available Although the incidence of minor heterotopic ossification is probably higher than what is usually expected, severe heterotopic ossification (HO is an extremely rare event following total knee replacement surgery. We present the case of a 66-year-old woman who initially had achieved an excellent range of motion following bilateral uncemented rotating platform total knee replacement, before presenting with pain and loss of range of motion at 2 months after surgery. Severe HO was diagnosed on X-rays. Treatment consisted of nonoperative measures only, including physiotherapy with hydrotherapy and anti-inflammatories. She eventually regained her range of motion when seen at 8 months after operation. This case illustrates that nonoperative treatment without the use of radiotherapy or surgery can be used to safely resolve stiffness caused by HO after total knee replacement.

  13. Report on a Zero-Knowledge Protocal Tabletop Exercise.

    Energy Technology Data Exchange (ETDEWEB)

    Marleau, Peter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brubaker, Erik [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Deland, Sharon M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hilton, Nathan R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McDaniel, Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schroeppel, Richard C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Seager, Kevin D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Stoddard, Mary Clare [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); MacArthur, Duncan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-06-01

    This report summarizes the discussion and conclusions reached during a table top exercise held at Sandia National Laboratories, Albuquerque on September 3, 2014 regarding a recently described approach for nuclear warhead verification based on the cryptographic concept of a zero-knowledge protocol (ZKP) presented in a recent paper authored by Glaser, Barak, and Goldston. A panel of Sandia National Laboratories researchers, whose expertise includes radiation instrumentation design and development, cryptography, and arms control verification implementation, jointly reviewed the paper and identified specific challenges to implementing the approach as well as some opportunities. It was noted that ZKP as used in cryptography is a useful model for the arms control verification problem, but the direct analogy to arms control breaks down quickly. The ZKP methodology for warhead verification fits within the general class of template-based verification techniques, where a reference measurement is used to confirm that a given object is like another object that has already been accepted as a warhead by some other means. This can be a powerful verification approach, but requires independent means to trust the authenticity of the reference warhead - a standard that may be difficult to achieve, which the ZKP authors do not directly address. Despite some technical challenges, the concept of last-minute selection of the pre-loads and equipment could be a valuable component of a verification regime.

  14. The use of adaptive equipment following total knee replacement

    OpenAIRE

    McNaught, Jamie; Paul, Lorna

    2015-01-01

    Introduction: This study evaluates the need for adaptive equipment following total knee replacement. There are no recent studies to guide occupational therapists in the optimum time adaptive equipment is required following total knee replacement.\\ud \\ud Method: A non-experimental, concurrent mixed methods approach was used. The study population was patients attending for total knee replacement at a large general hospital. Outcome measures were the Oxford Knee Score, the United Kingdom Functio...

  15. New energy replacement method for resonant power supplies

    International Nuclear Information System (INIS)

    Karady, G.G.; Thiessen, H.A.

    1989-01-01

    The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab

  16. Replacement Condition Detection of Railway Point Machines Using an Electric Current Sensor.

    Science.gov (United States)

    Sa, Jaewon; Choi, Younchang; Chung, Yongwha; Kim, Hee-Young; Park, Daihee; Yoon, Sukhan

    2017-01-29

    Detecting replacement conditions of railway point machines is important to simultaneously satisfy the budget-limit and train-safety requirements. In this study, we consider classification of the subtle differences in the aging effect-using electric current shape analysis-for the purpose of replacement condition detection of railway point machines. After analyzing the shapes of after-replacement data and then labeling the shapes of each before-replacement data, we can derive the criteria that can handle the subtle differences between "does-not-need-to-be-replaced" and "needs-to-be-replaced" shapes. On the basis of the experimental results with in-field replacement data, we confirmed that the proposed method could detect the replacement conditions with acceptable accuracy, as well as provide visual interpretability of the criteria used for the time-series classification.

  17. Infective endocarditis following percutaneous pulmonary valve replacement

    DEFF Research Database (Denmark)

    Cheung, Gary; Vejlstrup, Niels; Ihlemann, Nikolaj

    2013-01-01

    Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult.......Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult....

  18. 9 CFR 82.15 - Replacement birds and poultry.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Replacement birds and poultry. 82.15... AGRICULTURE INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS EXOTIC NEWCASTLE DIS- EASE (END) AND CHLAMYDIOSIS Exotic Newcastle Disease (END) § 82.15 Replacement birds and poultry. Birds...

  19. 30 CFR 57.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 57.12036 Section 57.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12036 Fuse removal or replacement. Fuses shall not be removed or...

  20. On Foundation Improvement By Sand Replacement | Abam | Global ...

    African Journals Online (AJOL)

    This paper describes a simple foundation improvement method involving the replacement of poor foundation bearing soils with sand and the resultant improvement in bearing capacity and the minimization of settlement at the site of a large storage tank. Minimum thickness of sand replacement for various foundation loads ...

  1. Optimization on replacement and inspection period of plant equipment

    International Nuclear Information System (INIS)

    Takase, Kentaro; Kasai, Masao

    2004-01-01

    Rationalization of the plant maintenance is one of the main topics being investigated in Japanese nuclear power industries. Optimization of the inspection and replacement period of equipments is effective for the maintenance cost reduction. The more realistic model of the replacement policy is proposed in this study. It is based on the classical replacement policy model and its cost is estimated. Then, to consider the inspection for the maintenance, the formulation that includes the risk concept is discussed. Based on it, two variations of the combination of the inspection and the replacement are discussed and the costs are estimated. In this study the effect of the degradation of the equipment is important. The optimized maintenance policy depends on the existence of significant degradation. (author)

  2. 30 CFR 872.29 - What are prior balance replacement funds?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false What are prior balance replacement funds? 872... § 872.29 What are prior balance replacement funds? “Prior balance replacement funds” are moneys we must... general funds of the United States Treasury that are otherwise unappropriated. Under section 411(h)(1) of...

  3. The cost function for the preventive - maintenance replacement problem

    OpenAIRE

    Vilaplana, Jose Perez

    1994-01-01

    Let a discounted continuous review preventive-maintenance replacement model be such that its total discounted cost is given by means of two functional equations. We assume that downtime is caused by equipment breakdowns, and the length of a given downtime is the time necessary to repair the equipment and set it back in operation. The periodic preventive replacement policy is to replace the equipment by a new identical equipment when service age X is reached, or when the equipment ...

  4. U.S. oil-import vulnerability: The technical replacement capability

    International Nuclear Information System (INIS)

    1991-10-01

    The report examines the changes that have taken place in world oil markets and the U.S. economy since 1984 and provides revised estimates of the technical oil replacement potential that might be attained in the event of a severe and long lasting cutoff of imported oil. The analysis focuses on technologies that are commercially available today or will be within the next 5 years and that are among the most cost-effective methods for replacing oil use in applicable sectors. It also considers the economic impacts of adopting an aggressive oil replacement strategy in a severe oil emergency. The report presents a variety of policy options that could help accelerate the adoption of oil replacement technologies in preparation for, or in response to, a severe supply disruption, or as part of a long-term national policy to reduce import vulnerability. The report concludes that U.S. capability to replace lost oil imports is shrinking. Market forces alone will not be sufficient to overcome the substantial economic and social dislocations that could result from a prolonged major oil disruption

  5. Imaging techniques in transcatheter aortic valve replacement

    Directory of Open Access Journals (Sweden)

    Quaife RA

    2013-11-01

    Full Text Available Robert A Quaife, Jennifer Dorosz, John C Messenger, Ernesto E Salcedo Division of Cardiology, University of Colorado, Aurora, CO, USA Abstract: Calcific aortic stenosis is now understood as a complex valvular degenerative process sharing many risk factors with atherosclerosis. Once patients develop symptomatic calcific aortic stenosis, the only effective treatment is aortic valve replacement. In the past decade, transcatheter aortic valve replacement (TAVR has been developed as an alternative to surgery to treat severe calcific aortic stenosis. Cardiac imaging plays a pivotal role in the contemporary management of patients with calcific aortic stenosis, and particularly in patients being considered for TAVR, who demand detailed imaging of the aortic valve apparatus. In this review, we highlight the role of cardiac imaging for patient selection, procedural guidance, and evaluation of results of TAVR. Keywords: aortic stenosis, cardiovascular imaging, transcutaneous aortic valve replacement

  6. Studies on the replacement policies in dairy cattle

    NARCIS (Netherlands)

    Arendonk, van J.A.M.

    1985-01-01

    In The Netherlands dairy farmers replace on average 25-30% of their cows each year. The decision to replace instead of to keep a cow is based mainly on economic considerations rather than because a cow is no longer able to produce.

    The investigations described in this thesis were

  7. 22 CFR 42.74 - Issuance of new or replacement visas.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Issuance of new or replacement visas. 42.74... IMMIGRATION AND NATIONALITY ACT, AS AMENDED Issuance of Immigrant Visas § 42.74 Issuance of new or replacement...) Replacement immigrant visa for an immediate relative or for an alien subject to numerical limitation. (1) A...

  8. Valve assembly having remotely replaceable bearings

    International Nuclear Information System (INIS)

    Johnson, E.R.; Tanner, D.E.

    1980-01-01

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings

  9. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  10. Midterm Results of Aortic Valve Replacement with Cryopreserved Homografts

    Directory of Open Access Journals (Sweden)

    Emre Özker

    2012-06-01

    Full Text Available Objective: The aim of this study was to analyze the midterm clinical results of aortic valve replacement with cryopreserved homografts.Materials and Methods: Aortic valve replacement was performed in 40 patients with cryopreserved homograft. The indications were aortic valve endocarditis in 20 patients (50%, truncus arteriosus in 6 patients (15%, and re-stenosis or regurtitation after aortic valve reconstruction in 14 (35% patients. The valve sizes ranged from 10 to 27mm. A full root replacement technique was used for homograft replacement in all patients.Results: The 30-day postoperative mortality rate was 12.5% (5 patients. There were four late deaths. Only one of them was related to cardiac events. Overall mortality was 22.5%. Thirty-three patients were followed up for 67±26 months. Two patients needed reoperation due to aortic aneurysm caused by endocarditis. The mean transvalvular gradient significantly decreased after valve replacement (p<0.003. The last follow up showed that the 27 (82% patients had a normal left ventricular function.Conclusion: Cryopreserved homografts are safe alternatives to mechanical valves that can be used when there are proper indications. Although it has a high perioperative mortality rate, cryopreserved homograft implantation is an alternative for valve replacement, particularly in younger patients and for complex surgical problems such as endocarditis that must be minimalized.

  11. Esophageal replacement in children: Challenges and long-term outcomes

    Directory of Open Access Journals (Sweden)

    Giampiero Soccorso

    2016-01-01

    Full Text Available Replacement of a nonexistent or damaged esophagus continues to pose a significant challenge to pediatric surgeons. Various esophageal replacement grafts and techniques have not produced consistently good outcomes to emulate normal esophagus. Therefore, many techniques are still being practiced and recommended with no clear consensus. We present a concise literature review of the currently used techniques and with discussions on the advantages and anticipated morbidity. There are no randomized controlled pediatric studies to compare different types of esophageal replacements. Management and graft choice are based on geographical and personal predilections rather than on any discernible objective data. The biggest series with long-term outcome are reported for gastric transposition and colonic replacement. Comparison of different studies shows no significant difference in early (graft necrosis and anastomotic leaks or late complications (strictures, poor feeding, gastro-esophageal reflux, tortuosity of the graft, and Barrett′s esophagus. The biggest series seem to have lower complications than small series reflecting the decennials experience in their respective centers. Long-term follow-up is recommended following esophageal replacement for the development of late strictures, excessive tortuosity, and Barrett′s changes within the graft. Once child overcomes initial morbidity and establishes oral feeding, long-term consequences and complications of pediatric esophageal replacement should be monitored and managed in adult life.

  12. Does Online Marketing Truly Replace Traditional Marketing?

    OpenAIRE

    Gunawan, Emilia Margareth

    2013-01-01

    This review explains the way how online marketing has been replacing traditional marketing in terms of marketing mix. This replacement might happen, because online marketing can give advantages, i.e., offering on-time delivery, increasing effectiveness of two way interactions between buyer and seller, and creating online communities (Szmigin, et al, 2005). The transition of atoms to bits format reflects that tangible products in traditional marketing is being digitalized. The marketing strate...

  13. The role of congress in future disposal of fissile materials from dismantled nuclear weapons

    International Nuclear Information System (INIS)

    Donnelly, W.H.; Davis, Z.S.

    1991-01-01

    Assuming the Soviet Union remains intact as a major power and the superpowers do not retrogress to a new Cold War era, it is likely that the United States and the Soviet Union will eventually agree to deep cuts in their nuclear arsenals. Future arms control agreements may be coupled with companion agreements to stop production of fissile materials for nuclear weapons, to dismantle the warheads of the nuclear weapons, and to dispose of their fissile materials to prevent reuse in new warheads. Such agreements would be negotiated by the U.S. executive branch but probably would require ratification, funding, and enabling legislation from the U.S. Congress if they are to succeed. There follows a brief review of the ideas for disposal of fissile materials from dismantled nuclear warheads and the potential role and influence of the Congress in the negotiation, ratification, and implementation of U.S.-Soviet agreements for such disposal

  14. Meal Replacement Mass Reduction Integration and Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Douglas, G.; Schneiderman, J.; Slack, K.; Whitmire, A.; Williams, T.; Young, M.

    2018-01-01

    The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore we are challenged to reduce the mass of the food system by 10% while maintaining safety, nutrition, and acceptability to support crew health and performance for exploration missions. Meal replacement with nutritionally balanced, 700-900 calorie bars was identified as a method to reduce mass. However, commercially available products do not meet the requirements for a meal replacement in the spaceflight food system. The purpose of this task was to develop a variety of nutritionally balanced, high quality, breakfast replacement bars, which enable a 10% food mass savings. To date, six nutrient-dense meal replacement bars have been developed, all of which meet spaceflight nutritional, microbiological, sensory, and shelf-life requirements. The four highest scoring bars were evaluated based on final product sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. color and texture), and microbiological compliance over a period of two years to predict long-term acceptability. All bars maintained overall acceptability throughout the first year of storage, despite minor changes in color and texture. However, added vitamins C, B1, and B9 degraded rapidly in fortified samples of Banana Nut bars, indicating the need for additional development. In addition to shelf-life testing, four bar varieties were evaluated in the Human Exploration Research Analog (HERA), campaign 3, to assess the frequency with which actual meal replacement options may be implemented, based on impact to satiety and psychosocial measurements. Crewmembers (n=16) were asked to consume meal replacement bars every day for the first fifteen days of the mission and every three days for the second half of the mission. Daily surveys assessed the crew's responses to bar acceptability, mood, food fatigue and perceived stress. Preliminary results indicate that the

  15. Medicare Program; Comprehensive Care for Joint Replacement Payment Model for Acute Care Hospitals Furnishing Lower Extremity Joint Replacement Services. Final rule.

    Science.gov (United States)

    2015-11-24

    This final rule implements a new Medicare Part A and B payment model under section 1115A of the Social Security Act, called the Comprehensive Care for Joint Replacement (CJR) model, in which acute care hospitals in certain selected geographic areas will receive retrospective bundled payments for episodes of care for lower extremity joint replacement (LEJR) or reattachment of a lower extremity. All related care within 90 days of hospital discharge from the joint replacement procedure will be included in the episode of care. We believe this model will further our goals in improving the efficiency and quality of care for Medicare beneficiaries with these common medical procedures.

  16. Joint Replacement Surgery: Health Information Basics for You and Your Family

    Science.gov (United States)

    ... Initiative Breadcrumb Home Health Topics English Español Joint Replacement Surgery Basics In-Depth Download Download EPUB Download ... What is it? Points To Remember About Joint Replacement Surgery Joint replacement surgery removes damaged or diseased ...

  17. 42 CFR 84.194 - Filters used with chemical cartridges; location; replacement.

    Science.gov (United States)

    2010-10-01

    ...; replacement. 84.194 Section 84.194 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN...; replacement. (a) Particulate matter filters used in conjunction with a chemical cartridge shall be located on... replacement on the cartridge. ...

  18. Modifications to Replacement Costs System

    International Nuclear Information System (INIS)

    Godec, M.

    1989-01-01

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985

  19. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves.

    Science.gov (United States)

    Gilbert, M S; Pantophlet, A J; van den Borne, J J G C; Hendriks, W H; Schols, H A; Gerrits, W J J

    2016-02-01

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy and protein metabolism in veal calves. Forty male Holstein-Friesian calves (114±2.4 kg) were fed milk replacer containing 46% lactose (CON) or 31% lactose and 15% of glucose (GLUC), fructose (FRUC), or glycerol (GLYC). Solid feed was provided at 10 g of dry matter (DM)/kg of metabolic body weight (BW(0.75)) per day. After an adaptation of 48 d, individual calves were harnessed, placed in metabolic cages, and housed in pairs in respiration chambers. Apparent total-tract disappearance of DM, energy, and N and complete energy and N balances were measured. The GLUC, FRUC, and GLYC calves received a single dose of 1.5 g of [U-(13)C]glucose, [U-(13)C]fructose, or [U-(13)C]glycerol, respectively, with their milk replacer at 0630 h and exhaled (13)CO2 and (13)C excretion with feces was measured. Apparent total-tract disappearance was decreased by 2.2% for DM, 3.2% for energy, and 4.2% for N in FRUC compared with CON calves. Energy and N retention did not differ between treatments, and averaged 299±16 kJ/kg of BW(0.75) per day and 0.79±0.04 g/kg of BW(0.75) per day, respectively, although FRUC calves retained numerically less N (13%) than other calves. Recovery of (13)C isotopes as (13)CO2 did not differ between treatments and averaged 72±1.6%. The time at which the maximum rate of (13)CO2 production was reached was more than 3 h delayed for FRUC calves, which may be explained by a conversion of fructose into other substrates before being oxidized. Recovery of (13)C in feces was greater for FRUC calves (7.7±0.59%) than for GLUC (1.0±0.27%) and GLYC calves (0.5±0.04%), indicating incomplete absorption of fructose from the small intestine resulting in fructose excretion or

  20. Prevalence of Total Hip and Knee Replacement in the United States.

    Science.gov (United States)

    Maradit Kremers, Hilal; Larson, Dirk R; Crowson, Cynthia S; Kremers, Walter K; Washington, Raynard E; Steiner, Claudia A; Jiranek, William A; Berry, Daniel J

    2015-09-02

    Descriptive epidemiology of total joint replacement procedures is limited to annual procedure volumes (incidence). The prevalence of the growing number of individuals living with a total hip or total knee replacement is currently unknown. Our objective was to estimate the prevalence of total hip and total knee replacement in the United States. Prevalence was estimated using the counting method by combining historical incidence data from the National Hospital Discharge Survey and the Healthcare Cost and Utilization Project (HCUP) State Inpatient Databases from 1969 to 2010 with general population census and mortality counts. We accounted for relative differences in mortality rates between those who have had total hip or knee replacement and the general population. The 2010 prevalence of total hip and total knee replacement in the total U.S. population was 0.83% and 1.52%, respectively. Prevalence was higher among women than among men and increased with age, reaching 5.26% for total hip replacement and 10.38% for total knee replacement at eighty years. These estimates corresponded to 2.5 million individuals (1.4 million women and 1.1 million men) with total hip replacement and 4.7 million individuals (3.0 million women and 1.7 million men) with total knee replacement in 2010. Secular trends indicated a substantial rise in prevalence over time and a shift to younger ages. Around 7 million Americans are living with a hip or knee replacement, and consequently, in most cases, are mobile, despite advanced arthritis. These numbers underscore the substantial public health impact of total hip and knee arthroplasties. Copyright © 2015 by The Journal of Bone and Joint Surgery, Incorporated.

  1. 33 CFR 1.26-5 - Replacement of medals.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Replacement of medals. 1.26-5 Section 1.26-5 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL... Rentals § 1.26-5 Replacement of medals. (a) A medal, or a bar, emblem, or insignia in lieu thereof, that...

  2. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  3. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  4. Machine replacement, Network Externalities and Investment Cycles

    OpenAIRE

    Juan Ruiz

    2003-01-01

    This paper presents a model where agents decide on the timing of replacement of ageing machines. The optimal replacement policy for an agent is influenced by other agents' decisions because the productivity of a particular vintage displays network externalities that set in with a lag. In equilibrium, agents follow innovation cycles with a frequency that is lower than optimal, so there is too much delay. One extreme case is the possibility of inefficient collapse: for some parameters there is ...

  5. OPTIMIZATION MODEL FOR VEHICLE ROUTING AND EQUIPMENT REPLACEMENT IN FARM MACHINERY

    OpenAIRE

    Grano, Carolina; Abensur, Eder

    2017-01-01

    ABSTRACT: An equipment replacement decision takes into account economic engineering models based on discounted cash flow (DCF) such as the Annual Equivalent Cost (AEC). Despite a large number of researches on industrial assets replacement, there is a lack of studies applied to farm goods. This study aimed at assessing an alternative model for economic decision analysis on farm machinery replacement, with no restrictions on the number of replacements and assessed goods during a defined timelin...

  6. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. A 'personnel office' stamped photocopy of the old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), between 8:30 and 12:30, in order to fill a 'fiche individuelle' form (in black ink only), which has to be personally signed by themselves and another separately signed by members of their family, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format (signed on the back) The French card in their possession an A4 photocopy of the same Fre...

  7. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  8. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  9. Extended replacement of the thoracic aorta.

    Science.gov (United States)

    Hino, Yutaka; Okada, Kenji; Oka, Takanori; Inoue, Takeshi; Tanaka, Akiko; Omura, Atsushi; Kano, Hiroya; Okita, Yutaka

    2013-01-01

    We present our experience of total aortic arch replacement. Twenty-nine patients (21 males and 8 females; mean age 63.3 ± 13.3 years) with extended thoracic aortic aneurysms underwent graft replacement. The pathology of the diseased aorta was non-dissecting aneurysm in 11 patients, including one aortitis and aortic dissection in 18 patients (acute type A: one, chronic type A: 11, chronic type B: six). Five patients had Marfan syndrome. In their previous operation, two patients had undergone the Bentall procedure, three had endovascular stenting, one had aortic root replacement with valve sparing and 12 had hemi-arch replacement for acute type A dissection. Approaches to the aneurysm were as follows: posterolateral thoracotomy with rib-cross incision in 16, posterolateral thoracotomy extended to the retroperitoneal abdominal aorta in seven, mid-sternotomy and left pleurotomy in three, anterolateral thoracotomy with partial lower sternotomy in two and clam-shell incision in one patient. Extension of aortic replacement was performed from the aortic root to the descending aorta in 4, from the ascending aorta to the descending aorta in 17 and from the ascending to the abdominal aorta in eight patients. Arterial inflow for cardiopulmonary bypass consisted of the femoral artery in 15 patients, ascending aorta and femoral artery in seven, descending or abdominal aorta in five and ascending aorta in two. Venous drainage site was the femoral vein in 10, pulmonary artery in eight, right atrium in five, femoral artery with right atrium/pulmonary artery in four and pulmonary artery with right atrium in two patients. The operative mortality, 30-day mortality and hospital mortality was one (cardiac arrest due to aneurysm rupture), one (rupture of infected aneurysm) and one (brain contusion), respectively. Late mortality occurred in three patients due to pneumonia, ruptured residual aneurysm and intracranial bleeding. Actuarial survival at 5 years after the operations was 80.6

  10. Investigation of gamma spectra analysis

    International Nuclear Information System (INIS)

    Wu Huailong; Liu Suping; Hao Fanhua; Gong Jian; Liu Xiaoya

    2006-01-01

    In the investigation of radiation fingerprint comparison, it is found out that some of the popular gamma spectra analysis software have shortcomings, which decrease the radiation fingerprint comparison precision. So a new analysis software is developed for solving the problems. In order to display the advantage of developed program, some typical simulative warhead gamma spectra are analyzed respectively by present software and GAMMAVISION and GENNIE2000. Present software can be applied not only in nuclear warheads deep-cuts verification, but also in any radiation measurement field. (authors)

  11. Analysis and optimization of trajectories for Ballistic Missiles Interception

    OpenAIRE

    Montero Yéboles, Daniel

    2016-01-01

    Intercontinental Ballistic Missiles are capable of placing a nuclear warhead at more than 5,000 km away from its launching base. With the lethal power of a nuclear warhead a whole city could be wiped out by a single weapon causing millions of deaths. This means that the threat posed to any country from a single ICBM captured by a terrorist group or launched by a 'rogue' state is huge. This threat is increasing as more countries are achieving nuclear and advanced launcher capabilities. In orde...

  12. Slab replacement maturity guidelines : [summary].

    Science.gov (United States)

    2014-04-01

    Concrete sets in hours at moderate temperatures, : but the bonds that make concrete strong continue : to mature over days to years. However, for : replacement concrete slabs on highways, it is : crucial that concrete develop enough strength : within ...

  13. Service water system repair/replacement guidelines: Planning and implementation

    International Nuclear Information System (INIS)

    Frederick, G.J.; Gandy, D.W.; Peterson, A.G. Jr.; Findlan, S.J.

    1993-11-01

    Service water system failures have prompted concerns related to extended power plant operating life and plant availability. Selection and procurement of materials for repair or replacement of piping and components may be the most important factors in improving service water system reliability. The authors examined factors that contribute to reduced SWS reliability. The factors include material selection inadequacies, water treatment problems, operational/maintenance practices, fabrication procedures, environmental degradation mechanisms, and coating problems. The authors investigated material selection for replacement and repair, taking into account fabrication practices, environmental concerns, and cost comparisons of materials. They examined specific components such as piping, pumps, valves, and heat exchangers with regard to material selection and fabrication practice. Although proper material selection is essential in upgrading and maintaining the designed functions of a SWS, it is critical to address SWS repair/replacement activities with a systemwide approach. Degradation of materials in SWS applications are plant specific, depending on factors unique to each site such as geographic location, existing materials, operating procedures, and environment. All these characteristics must be addressed in making repair/replacement decisions. Criteria that must be integrated for successful long-term operation of SWS include the following: Materials selection (upgrade or in-kind replacement), Evaluation of root cause or nature of the failure mechanism, Scope of the repair/replacement activities, Material compatibility of the existing materials, Operational and maintenance procedures, Code or jurisdictional requirements, Economic considerations, Water treatment programs, System design improvements or modifications

  14. Antibiotic Dosing in Continuous Renal Replacement Therapy.

    Science.gov (United States)

    Shaw, Alexander R; Mueller, Bruce A

    2017-07-01

    Appropriate antibiotic dosing is critical to improve outcomes in critically ill patients with sepsis. The addition of continuous renal replacement therapy makes achieving appropriate antibiotic dosing more difficult. The lack of continuous renal replacement therapy standardization results in treatment variability between patients and may influence whether appropriate antibiotic exposure is achieved. The aim of this study was to determine if continuous renal replacement therapy effluent flow rate impacts attaining appropriate antibiotic concentrations when conventional continuous renal replacement therapy antibiotic doses were used. This study used Monte Carlo simulations to evaluate the effect of effluent flow rate variance on pharmacodynamic target attainment for cefepime, ceftazidime, levofloxacin, meropenem, piperacillin, and tazobactam. Published demographic and pharmacokinetic parameters for each antibiotic were used to develop a pharmacokinetic model. Monte Carlo simulations of 5000 patients were evaluated for each antibiotic dosing regimen at the extremes of Kidney Disease: Improving Global Outcomes guidelines recommended effluent flow rates (20 and 35 mL/kg/h). The probability of target attainment was calculated using antibiotic-specific pharmacodynamic targets assessed over the first 72 hours of therapy. Most conventional published antibiotic dosing recommendations, except for levofloxacin, reach acceptable probability of target attainment rates when effluent rates of 20 or 35 mL/kg/h are used. Copyright © 2017 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  15. Delay in onset of metabolic alkalosis during regional citrate anti-coagulation in continous renal replacement therapy with calcium-free replacement solution

    Directory of Open Access Journals (Sweden)

    See Kay

    2009-01-01

    Full Text Available Regional citrate anti-coagulation for continuous renal replacement therapy chelates calcium to produce the anti- coagulation effect. We hypothesise that a calcium-free replacement solution will require less citrate and produce fewer metabolic side effects. Fifty patients, in a Medical Intensive Care Unit of a tertiary teaching hospital (25 in each group, received continuous venovenous hemofiltration using either calcium-containing or calcium-free replacement solutions. Both groups had no significant differences in filter life, metabolic alkalosis, hypernatremia, hypocalcemia, and hypercalcemia. However, patients using calcium-containing solution developed metabolic alkalosis earlier, compared to patients using calcium-free solution (mean 24.6 hours,CI 0.8-48.4 vs. 37.2 hours, CI 9.4-65, P = 0.020. When calcium-containing replacement solution was used, more citrate was required (mean 280ml/h, CI 227.2-332.8 vs. 265ml/h, CI 203.4-326.6, P = 0.069, but less calcium was infused (mean 21.2 ml/h, CI 1.2-21.2 vs 51.6ml/h, CI 26.8-76.4, P ≤ 0.0001.

  16. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS LICENSE EXCEPTIONS § 740.10 Servicing and replacement of parts and equipment (RPL). This License... replacement of equipment. (a) Parts—(1) Scope. The provisions of this paragraph (a) authorize the export and reexport of one-for-one replacement parts for previously exported equipment. (2) One-for-one replacement of...

  17. Structural Evaluation of the RSRM Nozzle Replacement Adhesive

    Science.gov (United States)

    Batista-Rodriguez, A.; McLennan, M. L.; Palumbos, A. V.; Richardson, D. E.

    1999-01-01

    This paper describes the structural performance evaluation of a replacement adhesive for the Reusable Solid Rocket Motor (RSRM) nozzle utilizing finite element analysis. Due to material obsolescence and industrial safety issues, the two current structural adhesives, EA 913 and EA 946 are to be replaced with a new adhesive. TIGA 321. The structural evaluation in support of the adhesive replacement effort includes residual stress, transportation, and flight analyses. Factors of safety are calculated using the stress response from each analysis. The factors of safety are used as the limiting criteria to compare the replacement adhesive against the current adhesives. Included in this paper are the analytical approach, assumptions and modeling techniques as well as the results of the evaluation. An important factor to the evaluation is the similarity in constitutive material properties (elastic modulus and Poisson's ratio) between TIGA 321 and EA 913. This similarity leads to equivalent material response from the two adhesives. However, TIGA 321 surpasses EA 913's performance due to higher material capabilities. Conversely, the change in stress response from EA 946 to TIGA 321 is more apparent: this is primarily attributed to the difference in the modulii of the two adhesives, which differ by two orders of magnitude. The results of the bondline evaluation indicate that the replacement adhesive provides superior performance than the current adhesives with only minor exceptions. Furthermore, TIGA 321 causes only a minor chance in the response of the phenolic and metal components.

  18. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...

  19. Hormone replacement therapy increases the risk of cranial meningioma

    DEFF Research Database (Denmark)

    Andersen, Lene; Friis, Søren; Hallas, Jesper

    2013-01-01

    We investigated the influence of hormone replacement therapy (HRT) use on the risk of meningioma in a population-based setting.......We investigated the influence of hormone replacement therapy (HRT) use on the risk of meningioma in a population-based setting....

  20. Advances in the replacement and enhanced replacement method in QSAR and QSPR theories.

    Science.gov (United States)

    Mercader, Andrew G; Duchowicz, Pablo R; Fernández, Francisco M; Castro, Eduardo A

    2011-07-25

    The selection of an optimal set of molecular descriptors from a much greater pool of such regression variables is a crucial step in the development of QSAR and QSPR models. The aim of this work is to further improve this important selection process. For this reason three different alternatives for the initial steps of our recently developed enhanced replacement method (ERM) and replacement method (RM) are proposed. These approaches had previously proven to yield near optimal results with a much smaller number of linear regressions than the full search. The algorithms were tested on four different experimental data sets, formed by collections of 116, 200, 78, and 100 experimental records from different compounds and 1268, 1338, 1187, and 1306 molecular descriptors, respectively. The comparisons showed that one of the new alternatives further improves the ERM, which has shown to be superior to genetic algorithms for the selection of an optimal set of molecular descriptors from a much greater pool. The new proposed alternative also improves the simpler and the lower computational demand algorithm RM.

  1. 21 CFR 874.3540 - Prosthesis modification instrument for ossicular replacement surgery.

    Science.gov (United States)

    2010-04-01

    ... replacement surgery. 874.3540 Section 874.3540 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF... § 874.3540 Prosthesis modification instrument for ossicular replacement surgery. (a) Identification. A prosthesis modification instrument for ossicular replacement surgery is a device intended for use by a...

  2. Changing of the guard: reducing infection when replacing neural pacemakers.

    Science.gov (United States)

    Pepper, Joshua; Meliak, Lara; Akram, Harith; Hyam, Jonathan; Milabo, Catherine; Candelario, Joseph; Foltynie, Thomas; Limousin, Patricia; Curtis, Carmel; Hariz, Marwan; Zrinzo, Ludvic

    2017-04-01

    OBJECTIVE Infection of deep brain stimulation (DBS) hardware has a significant impact on patient morbidity. Previous experience suggests that infection rates appear to be higher after implantable pulse generator (IPG) replacement surgery than after the de novo DBS procedure. In this study the authors examine the effect of a change in practice during DBS IPG replacements at their institution. METHODS Starting in January 2012, patient screening for methicillin-resistant Staphylococcus aureus (MRSA) and, and where necessary, eradication was performed prior to elective DBS IPG change. Moreover, topical vancomycin was placed in the IPG pocket during surgery. The authors then prospectively examined the infection rate in patients undergoing DBS IPG replacement at their center over a 3-year period with at least 9 months of follow-up. RESULTS The total incidence of infection in this prospective consecutive series of 101 IPG replacement procedures was 0%, with a mean follow-up duration of 24 ± 11 months. This was significantly lower than the authors' previously published historical control group, prior to implementing the change in practice, where the infection rate for IPG replacement was 8.5% (8/94 procedures; p = 0.003). CONCLUSIONS This study suggests that a change in clinical practice can significantly lower infection rates in patients undergoing DBS IPG replacement. These simple measures can minimize unnecessary surgery, loss of benefit from chronic stimulation, and costly hardware replacement, further improving the cost efficacy of DBS therapies.

  3. Nursing procedures during continuous renal replacement therapies: a national survey.

    Science.gov (United States)

    Ricci, Zaccaria; Benelli, Sonia; Barbarigo, Fabio; Cocozza, Giulia; Pettinelli, Noemi; Di Luca, Emanuela; Mettifogo, Mariangela; Toniolo, Andrea; Ronco, Claudio

    2015-01-01

    The current role of nurses in the management of critically ill patients needing continuous renal replacement therapies is clearly fundamental. The care of these complex patients is typically shared by critical care and dialysis nurses: their precise duties may vary from country to country. To clarify this issue we conducted a national-level survey at a recent Italian course on nursing practices during continuous renal replacement therapies. A total of 119 questionnaires were analysed. The participants, who were equally divided between critical care and dialysis nurses, came from 44 different hospitals and 35 Italian cities. Overall, 23% of participants answered that "the dialysis staff" were responsible for continuous renal replacement therapies in the Intensive Care Unit, while 39% answered "the critical care nurse", and 38% "a shared organization". Interestingly, less than the half of participants claimed specific continuous renal replacement therapies training was provided to employees before handling an acute dialysis machine. Finally, about 60% of participants had experience of extra-corporeal membrane oxygenation machines used in conjunction with continuous renal replacement therapies. Workload coordination and management of critically ill patients undergoing continuous renal replacement therapies in Italy is not standardized. At present, the duties of critical care and dialysis nurses vary significantly across the country. They frequently overlap or leave gaps in the assistance received by patients. The role of nurses involved in the care of continuous renal replacement therapies patients in Italy currently requires better organization, possibly starting with intensive standardized training and educational programs.

  4. 76 FR 30369 - Announcement of the Award of a Replacement Grant

    Science.gov (United States)

    2011-05-25

    ... the Award of a Replacement Grant AGENCY: Office of Community Services (OCS), ACF, DHHS. ACTION: Announcement of the award of a replacement grant from the Office of Community Services to Humboldt State... Services (OCS), announces the award of a replacement grant under the Strengthening Communities Fund (SCF...

  5. Opportunity-based age replacement: exponentially distributed times between opportunities

    NARCIS (Netherlands)

    R. Dekker (Rommert); M.C. Dijkstra (Matthijs)

    1992-01-01

    textabstractThis article gives a full analysis of a component-replacement model in which preventive replacements are only possible at maintenance opportunities. These oppertunities arise according to a Poisson process, independently of failures of the component. Conditions for the existence of a

  6. Excellence in fleet combat replacement squadrons: predicting carrier qualification success

    OpenAIRE

    Smith, Martin P.

    1988-01-01

    This thesis presents a two-part analysis of excellence criteria for fleet combat replacement squadrons. Part one focuses on the qualitative issues and management techniques identified in outstanding fleet combat replacement squadrons. Part two develops and presents a regression model for predicting a fleet replacement squadron pilot's carrier qualification grade. The model was derived using standard linear regression techniques and the SPSSx software package of the Naval Postgraduate School. ...

  7. An approach to solve replacement problems under intuitionistic fuzzy nature

    Science.gov (United States)

    Balaganesan, M.; Ganesan, K.

    2018-04-01

    Due to impreciseness to solve the day to day problems the researchers use fuzzy sets in their discussions of the replacement problems. The aim of this paper is to solve the replacement theory problems with triangular intuitionistic fuzzy numbers. An effective methodology based on fuzziness index and location index is proposed to determine the optimal solution of the replacement problem. A numerical example is illustrated to validate the proposed method.

  8. Replacement of major nuclear power plant components for service life extension

    International Nuclear Information System (INIS)

    Novak, S.

    1987-01-01

    Problems are discussed associated with replacement of nuclear power plant components with the aim to extend their original scheduled life. The existing foreign experience shows that it is technically feasible to replace practically all basic components for which the necessity of replacement is established. Data is summed up on the replacement of steam generators in US and West German nuclear power plants showing the duration of the job, the total consumption of manhours, the collective dose equivalent and the cost. Attention is also focused on implemented and projected replacements of circulation pipes in nuclear power plants abroad. Based on these figures, the cost is estimated of the replacement of the reactor vessel and the steam generators for WWER-440 nuclear power plants. The conclusion is arrived at that even based on a conservative estimate, the extension by 20 years of the service life of a nuclear power plant is economically more effective than the construction of a new plant. (Z.M.) 2 tabs., 15 refs., 3 figs

  9. Disposition scenarios and safeguardability of fissile materials under START Treaty

    International Nuclear Information System (INIS)

    Pillay, K.K.S.

    1993-01-01

    Under the Strategic Arms Reduction Treaty (START-I) signed in 1991 and the Lisbon Protocol of 1992, a large inventory of fissile materials will be removed from the weapons fuel cycles of the United States and the Former Soviet Union (FSU). The Lisbon Protocol calls for Ukraine, Kazakstan, and Byelarus to become nonnuclear members of the treaty and for Russia to assume the responsibility of the treaty as a nuclear weapons state. In addition, the START-II Treaty, which was signed in 1993 by the United States and Russia, further reduces deployed nuclear warheads and adds to the inventory of excess special nuclear materials (SNM). Because storage of in-tact warheads has the potential for a open-quotes breakout,close quotes it would be desirable to dismantle the warheads and properly dispose of the SNMs under appropriate safeguards to prevent their reentry into the weapons fuel cycle. The SNM recovered from dismantled warheads can be disposed of in several ways, and the final choices may be up to the country having the title to the SNM. Current plans are to store them indefinitely, leaving serious safeguards concerns. Recognizing that the underlying objective of these treaties is to prevent the fissile materials from reentering the weapons fuel cycle, it is necessary to establish a verifiable disposal scheme that includes safeguards requirements. This paper identifies some realistic scenarios for the disposal of SNM from the weapons fuel cycle and examines the safeguardability of those scenarios

  10. Replacement and inspection policies for products with random life cycle

    International Nuclear Information System (INIS)

    Yun, Won Young; Nakagawa, Toshio

    2010-01-01

    In this paper, we consider maintenance policies for products in which the economical life cycle of products is a random variable. First, we study a periodic replacement policy with minimal repair. The system is minimally repaired at failure and is replaced by new one at age T (periodic replacement policy with minimal repair of Barlow and Hunter). The expected present value of total maintenance cost of products with random life cycle is obtained and the optimal replacement interval minimizing the cost is found. Second, we consider an inspection policy for products with random life cycle to detect the system failure. The expected total cost is obtained and the optimal inspection interval is found. Numerical examples are also included.

  11. Fluorescent Lamp Replacement Study

    Science.gov (United States)

    2017-07-01

    not be cited for purposes of advertisement. DISPOSITION INSTRUCTIONS: Destroy this document when no longer needed. Do not return to the... recycling , and can be disposed safely in a landfill. (2) LEDs offer reduced maintenance costs and fewer bulb replacements, significantly reducing... recycling . Several fixtures, ballasts and energy efficient fluorescent bulbs that were determined to be in pristine condition were returned to ATC

  12. Application of capital replacement models with finite planning horizons

    NARCIS (Netherlands)

    Scarf, P.A.; Christer, A.H.

    1997-01-01

    Capital replacement models with finite planning horizons can be used to model replacement policies in complex operational contexts. They may also be used to investigate the cost consequences of technological change. This paper reviews the application of these models in various such contexts. We also

  13. Replacement Power Facility site selection report

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  14. Rapid replacement/construction of bridges.

    Science.gov (United States)

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  15. QUALITY OF LIFE, COUNSELLING AND HORMONE REPLACEMENT THERAPY

    Directory of Open Access Journals (Sweden)

    Nena Kopčavar Guček

    2008-12-01

    Quality of life in menopause is a result of many factors and therefore it is very individual.Hormone replacement therapy is one of the possibilities of improvement. Therefore, it isessential that a woman is adequately informed about all the advantages and risks of thehormonal replacement therapy. Only an informed patient can be a partner in shareddecision making about the improvement of quality of life

  16. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  17. Fractal dimension evolution and spatial replacement dynamics of urban growth

    International Nuclear Information System (INIS)

    Chen Yanguang

    2012-01-01

    Highlights: ► The fractal dimension growth can be modeled by Boltzmann’s equation. ► Boltzmann’s model suggests urban spatial replacement dynamics. ► If the rate of urban growth is too high, periodic oscillations or chaos will arise. ► Chaos is associated with fractals by the fractal dimension evolution model. ► The fractal dimension of urban form implies the space-filling ratio of a city. - Abstract: This paper presents a new perspective of looking at the relation between fractals and chaos by means of cities. Especially, a principle of space filling and spatial replacement is proposed to interpret the fractal dimension of urban form. The fractal dimension evolution of urban growth can be empirically modeled with Boltzmann’s equation. For the normalized data, Boltzmann’s equation is just equivalent to the logistic function. The logistic equation can be transformed into the well-known 1-dimensional logistic map, which is based on a 2-dimensional map suggesting spatial replacement dynamics of city development. The 2-dimensional recurrence relations can be employed to generate the nonlinear dynamical behaviors such as bifurcation and chaos. A discovery is thus made in this article that, for the fractal dimension growth following the logistic curve, the normalized dimension value is the ratio of space filling. If the rate of spatial replacement (urban growth) is too high, the periodic oscillations and chaos will arise. The spatial replacement dynamics can be extended to general replacement dynamics, and bifurcation and chaos mirror a process of complex replacement.

  18. Meal Replacement Mass Reduction and Integration Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Barrett, A.; Richardson, M.; Arias, D.; Schneiderman, J.; Slack, K.; Williams, T.; Douglas, G.

    2017-01-01

    NASA, in planning for long-duration missions, has an imperative to provide a food system with the necessary nutrition, acceptability, and safety to ensure sustainment of crew health and performance. The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore the team is challenged to reduce the mass of the food system by 10% while maintaining product safety, nutrition, and acceptability. Commercially available products do not meet the nutritional requirements for a full meal replacement in the spaceflight food system, and it is currently unknown if daily meal replacements will impact crew food intake and psychosocial health over time. The purpose of this study was to develop a variety of nutritionally balanced breakfast replacement bars that meet spaceflight nutritional, microbiological, sensorial, and shelf-life requirements, while enabling a 10% savings in food mass. To date, six nutrient-dense meal replacement bars (approximately 700 calories per bar) have been developed, using traditional methods of compression as well as novel ultrasonic compression technologies developed by Creative Resonance Inc. (Phoenix, AZ). The four highest rated bars were evaluated in the Human Exploration Research Analog (HERA) to assess the frequency with which actual meal replacement options may be implemented. Specifically, overall impact of bars on mood, satiety, digestive discomfort, and satisfaction with food. These factors are currently being analyzed to inform successful implementation strategies where crew maintain adequate food intake. In addition, these bars are currently undergoing shelf-life testing to determine long-term sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. water activity and texture), and microbiological compliance over two years of storage at room temperature and potential temperature abuse conditions to predict long-term acceptability. It is expected that

  19. Special features of total knee replacement in hemophilia.

    Science.gov (United States)

    Rodriguez-Merchan, Emerito Carlos

    2013-12-01

    Total knee replacement is an operation frequently needed by hemophilia patients, which greatly improves their quality of life. This operation, however, carries a higher risk of bleeding and infection for hemophiliacs than it does for osteoarthritis sufferers. It is advisable to implant prosthetic components using antibiotic-loaded cement. It is essential to maintain a level of 100% of the replacement clotting factor for 2 weeks. Hematological treatment must be established, depending on the patient's factor levels and other pharmacokinetic parameters such as recovery and half-life, optimal doses and treatment time. It is preferable to use general anesthesia due to the risk of spinal bleeding. The lifespan of total knee replacement in hemophilic patients is shorter than in patients with osteoarthritis because of the increased risk of infection.

  20. Opportunity-based age replacement policy with minimal repair

    International Nuclear Information System (INIS)

    Jhang, J.P.; Sheu, S.H.

    1999-01-01

    This paper proposes an opportunity-based age replacement policy with minimal repair. The system has two types of failures. Type I failures (minor failures) are removed by minimal repairs, whereas type II failures are removed by replacements. Type I and type II failures are age-dependent. A system is replaced at type II failure (catastrophic failure) or at the opportunity after age T, whichever occurs first. The cost of the minimal repair of the system at age z depends on the random part C(z) and the deterministic part c(z). The opportunity arises according to a Poisson process, independent of failures of the component. The expected cost rate is obtained. The optimal T * which would minimize the cost rate is discussed. Various special cases are considered. Finally, a numerical example is given

  1. Installation technology of reactor internals on shroud replacement work

    International Nuclear Information System (INIS)

    Miyano, Hiroshi

    1999-01-01

    Since the replacement of large welded reactor internals much as a core shroud did not have a precedent in the world, quite a few technologies had to be developed. Especially for the installation of new core shroud, jet pumps, core plate and top guide, the accurate weld and fit-up techniques for large structures was required to secure their integrity. The vessel shielding system was utilized to reduce general area dose rate such that all replacement work. For jet pump installation, automatic remote welding machines were used for high radiation area. As for the core shroud, shroud support weld prep machining tool with high accuracy, jacking system to support fit-up, new weld machine for small work space and low heat input weld joint were developed. Shroud replacement work in Fukushima Dai-ichi NPS Unit 3 (1F-3) with application of these development techniques, was successfully accomplished. The technology is applied for 1F-2 replacement work also. (author)

  2. Replacement model of city bus: A dynamic programming approach

    Science.gov (United States)

    Arifin, Dadang; Yusuf, Edhi

    2017-06-01

    This paper aims to develop a replacement model of city bus vehicles operated in Bandung City. This study is driven from real cases encountered by the Damri Company in the efforts to improve services to the public. The replacement model propounds two policy alternatives: First, to maintain or keep the vehicles, and second is to replace them with new ones taking into account operating costs, revenue, salvage value, and acquisition cost of a new vehicle. A deterministic dynamic programming approach is used to solve the model. The optimization process was heuristically executed using empirical data of Perum Damri. The output of the model is to determine the replacement schedule and the best policy if the vehicle has passed the economic life. Based on the results, the technical life of the bus is approximately 20 years old, while the economic life is an average of 9 (nine) years. It means that after the bus is operated for 9 (nine) years, managers should consider the policy of rejuvenation.

  3. [Effects of growth hormone replacement therapy on bone metabolism].

    Science.gov (United States)

    Yamamoto, Masahiro; Sugimoto, Toshitsugu

    2014-06-01

    Growth hormone (GH) as well as insulin like growth factor-1 (IGF-1) are essential hormones to maintain homeostasis of bone turnover by activating osteoblastogenesis and osteoclastogenesis. Results from GH replacement therapy for primary osteoporosis and adult-onset GH deficiency (AGHD) suggest that one year or more treatment period by this agent is required to gain bone mineral density (BMD) over the basal level after compensating BMD loss caused by dominant increase in bone resorption which was observed at early phase of GH treatment. A recent meta-analysis demonstrates the efficacy of GH replacement therapy on increases in BMD in male patients with AGHD. Additional analyses are needed to draw firm conclusions in female patients with AGHD, because insufficient amounts of GH might be administrated to them without considerations of influence of estrogen replacement therapy on IGF-1 production. Further observational studies are needed to clarify whether GH replacement therapy prevent fracture risk in these patients.

  4. Fuzzy logic application for extruders replacement problem

    Directory of Open Access Journals (Sweden)

    Edison Conde Perez dos Santos

    2017-03-01

    Full Text Available In a scenario of uncertainty and imprecision, before taking the replacement analysis, a manager needs to consider the uncertain reality of a problem. In this scenario, the fuzzy logic makes an excellent option. Therefore, it is necessary to make a decision based on the fuzzy model. This study is based on the comparison of two methodologies used in the problem of asset replacement. The study, thus, was based on a comparison between two extruders for polypropylene yarn bibliopegy, comparing mainly the costs involved in maintaining the equipment.

  5. Radiological evaluation of failed total hip replacement

    International Nuclear Information System (INIS)

    Raspa, V.; Aldrovandi, S.; Pompei, G.

    1988-01-01

    The retrospective study of 50 operated cases of cemented total hip replacement and a review of the literature enabled the authors to define the radiological features of the above-mentioned condition. These features include one or more of the following signs: calcar reabsorption, lacunar erosions, modified relatioships between the prosthesis components, sepsis and loosening, periarticular calcifications dislocation and fracture of prosthesis components. Careful evaluation of these radiological features is extremely important for both an early diagnosis of failed total hip replacement and the choice of an adequate surgical treatment

  6. Generator replacement is associated with an increased rate of ICD lead alerts.

    Science.gov (United States)

    Lovelock, Joshua D; Cruz, Cesar; Hoskins, Michael H; Jones, Paul; El-Chami, Mikhael F; Lloyd, Michael S; Leon, Angel; DeLurgio, David B; Langberg, Jonathan J

    2014-10-01

    Lead malfunction is an important cause of morbidity and mortality in patients with an implantable cardioverter-defibrillator (ICD). We have shown that the failure of recalled high-voltage leads significantly increases after ICD generator replacement. However, generator replacement has not been recognized as a predictor of lead failure in general. The purpose of this study is to assess the effect of ICD generator exchange on the rate of ICD lead alerts. A time-dependent Cox proportional hazards model was used to analyze a database of remotely monitored ICDs. The model assessed the impact of generator exchange on the rate of lead alerts after ICD generator replacement. The analysis included 60,219 patients followed for 37 ± 19 months. The 5-year lead survival was 99.3% (95% confidence interval 99.2%-99.4%). Of 60,219 patients, 7458 patients (12.9%) underwent ICD generator exchange without lead replacement. After generator replacement, the rate of lead alerts was more than 5-fold higher than in controls with leads of the same age without generator replacement (hazard ratio 5.19; 95% confidence interval 3.45-7.84). A large number of lead alerted within 3 months of generator replacement. Lead alerts were more common in patients with single- vs dual-chamber ICDs and in younger patients. Sex was not associated with lead alerts. Routine generator replacement is associated with a 5-fold higher risk of lead alert compared to age-matched leads without generator replacement. This suggests the need for intense surveillance after generator replacement and the development of techniques to minimize the risk of lead damage during generator replacement. Copyright © 2014 Heart Rhythm Society. Published by Elsevier Inc. All rights reserved.

  7. New Approaches and New Technologies for the Verification of Nuclear Disarmament

    International Nuclear Information System (INIS)

    Keir, David

    2013-01-01

    ESARDA’s New Approaches/Novel Technologies Working group has recently begun to take a great interest in technology for use in arms control verification, in parallel with a focus on Nuclear Safeguards technology. A topic-based meeting of members of the NA/NT Subgroup was hosted at Joint Research Centre (JRC), ITU-Nuclear Security Unit in Ispra (Italy), to further explore the technical issues and opportunities presented by the need for new approaches and technologies in a future verified nuclear weapons dismantlement regime. Nuclear warheads must contain radioactive material and, by their nature, gamma rays and neutrons are likely to penetrate to the outside of the warhead casing and even metal containers. Therefore radiation signatures should be detectable by appropriate pieces of equipment. For this reason, researchers in the field of technical verification of nuclear warhead dismantlement have studied and developed technologies for Non-Destructive Assay (NDA). This paper presents a generic dismantlement pathway for verified nuclear warhead dismantlement, based on the scenario employed by the UK-Norway initiative for their exercise in 2008/9. Using this as a framework the types of measurement challenge likely to be presented to a verifying inspector are discussed. The problem of intrusiveness of measurements in relation to the issue of proliferative release of classified information about the warhead attributes is discussed and the concept of ‘information barriers is introduced as a possible solution to this issue. A list of candidate technologies for use in verification activities, with or without information barriers is then presented and, since most of these are new or novel approaches to the issue, an already-established system for classifying them – in terms of state of development and complexity of use in this context – is proposed. Finally, the concept of capturing this information as a library of ‘data sheets’, designed for periodic review as

  8. Quantitative replacement of soybean meal with toasted African yam ...

    African Journals Online (AJOL)

    From the result, one can conclude that 25% AYB (treatment II) compared favourably with the control diets 0% AYB in starter broiler diets and is hereby recommended as optimal for quantitative replacement of soybean in broiler starter diet. Key words: Broiler Starter diet, African Yam Bean, Soyabean replacement ...

  9. Gait analysis after successful mobile bearing total ankle replacement.

    NARCIS (Netherlands)

    Doets, H.C.; van Middelkoop, M.; Houdijk, J.H.P.; Nelissen, R.G.; Veeger, H.E.J.

    2007-01-01

    Background: The effect of total ankle replacement on gait is not fully known in terms of joint kinematics, ground reaction force, and activity of the muscles of the lower leg. Methods: A comparative gait study was done in 10 patients after uneventful unilateral mobile-bearing total ankle replacement

  10. Remaining lifetime modelling for replacement of power transformer populations

    NARCIS (Netherlands)

    Schijndel, van A.; Wetzer, J.; Wouters, P.A.A.F.

    2008-01-01

    The age of the majority of power transformers applied in the western electricity network varies between 25 and 50 years. Depending on the load history and time of operation, replacement on short term is imminent. A technically sound policy concerning the replacement of these assets must be based on

  11. Advances in Rosetta structure prediction for difficult molecular-replacement problems

    International Nuclear Information System (INIS)

    DiMaio, Frank

    2013-01-01

    Modeling advances using Rosetta structure prediction to aid in solving difficult molecular-replacement problems are discussed. Recent work has shown the effectiveness of structure-prediction methods in solving difficult molecular-replacement problems. The Rosetta protein structure modeling suite can aid in the solution of difficult molecular-replacement problems using templates from 15 to 25% sequence identity; Rosetta refinement guided by noisy density has consistently led to solved structures where other methods fail. In this paper, an overview of the use of Rosetta for these difficult molecular-replacement problems is provided and new modeling developments that further improve model quality are described. Several variations to the method are introduced that significantly reduce the time needed to generate a model and the sampling required to improve the starting template. The improvements are benchmarked on a set of nine difficult cases and it is shown that this improved method obtains consistently better models in less running time. Finally, strategies for best using Rosetta to solve difficult molecular-replacement problems are presented and future directions for the role of structure-prediction methods in crystallography are discussed

  12. A general approach to total repair cost limit replacement policies

    Directory of Open Access Journals (Sweden)

    F. Beichelt

    2014-01-01

    Full Text Available A common replacement policy for technical systems consists in replacing a system by a new one after its economic lifetime, i.e. at that moment when its long-run maintenance cost rate is minimal. However, the strict application of the economic lifetime does not take into account the individual deviations of maintenance cost rates of single systems from the average cost development. Hence, Beichet proposed the total repair cost limit replacement policy: the system is replaced by a new one as soon as its total repair cost reaches or exceeds a given level. He modelled the repair cost development by functions of the Wiener process with drift. Here the same policy is considered under the assumption that the one-dimensional probability distribution of the process describing the repair cost development is given. In the examples analysed, applying the total repair cost limit replacement policy instead of the economic life-time leads to cost savings of between 4% and 30%. Finally, it is illustrated how to include the reliability aspect into the policy.

  13. TOTAL KNEE REPLACEMENT IN PATIENTS WITH BELOW-KNEE AMPUTATION

    Science.gov (United States)

    Karam, Matthew D; Willey, Michael; Shurr, Donald G

    2010-01-01

    Total knee replacement (TKR) is reserved for patients with severe and disabling arthritis that is non-responsive to conservative measures. Based on existing data, total knee replacement is a safe and cost-effective treatment for alleviating pain and improving physical function in patients who do not respond to conservative therapy. Despite the large variation in health status of patients and types of prosthesis implanted, total knee replacement has proven to be a relatively low risk and successful operation. Each year in the United States surgeons perform approximately 300,000 TKR.1 Likewise, lower extremity amputation is commonly performed in the United States with an annual incidence of 110,000 per year.2 Nearly 70% of all lower extremity amputations are performed as the result of chronic vascular disease, followed by trauma (22%), congenital etiology and tumor (4% each).3 Approximately 50% of all lower extremity amputations are performed secondary to complications from Diabetes Mellitus. Norvell et al. demonstrated that patients who have previously undergone transtibial amputation and ambulate with a prosthesis are more likely to develop degenerative joint disease in the con-tralateral extremity than the ipsilateral extremity.4 Further, radiographic changes consistent with osteoporosis have been demonstrated in up to 88% of limbs that have undergone transtibial amputation.8 To our knowledge, there have been only three reported cases of total knee replacement in patients with ipsilateral transtibial amputation.5,7 The purpose of the present study is to review the existing data on total knee replacement in patients who have undergone transtibial amputation. Further we present a patient with a transtibial amputation who underwent contralateral total knee replacement. PMID:21045987

  14. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  15. Aortic Root Replacement for Children With Loeys-Dietz Syndrome.

    Science.gov (United States)

    Patel, Nishant D; Alejo, Diane; Crawford, Todd; Hibino, Narutoshi; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2017-05-01

    Loeys-Dietz syndrome (LDS) is an aggressive aortopathy with a proclivity for aortic aneurysm rupture and dissection at smaller diameters than other connective tissue disorders. We reviewed our surgical experience of children with LDS to validate our guidelines for prophylactic aortic root replacement (ARR). We reviewed all children (younger than 18 years) with a diagnosis of LDS who underwent ARR at our institution. The primary endpoint was mortality, and secondary endpoints included complications and the need for further interventions. Thirty-four children with LDS underwent ARR. Mean age at operation was 10 years, and 15 (44%) were female. Mean preoperative root diameter was 4 cm. Three children (9%) had composite ARR with a mechanical prosthesis, and 31 (91%) underwent valve-sparing ARR. Concomitant procedures included arch replacement in 2 (6%), aortic valve repair in 1 (3%), and patent foramen ovale closure in 16 (47%). There was no operative mortality. Two children (6%) required late replacement of the ascending aorta, 5 (15%) required arch replacement, 1 (3%) required mitral valve replacement, and 2 (6%) had coronary button aneurysms/pseudoaneurysms requiring repair. Three children required redo valve-sparing ARR after a Florida sleeve procedure, and 2 had progressive aortic insufficiency requiring aortic valve replacement after a valve-sparing procedure. There were 2 late deaths (6%). These data confirm the aggressive aortopathy of LDS. Valve-sparing ARR should be performed when feasible to avoid the risks of prostheses. Serial imaging of the arterial tree is critical, given the rate of subsequent intervention. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  16. Optimal Replacement and Management Policies for Beef Cows

    OpenAIRE

    W. Marshall Frasier; George H. Pfeiffer

    1994-01-01

    Beef cow replacement studies have not reflected the interaction between herd management and the culling decision. We demonstrate techniques for modeling optimal beef cow replacement intervals and discrete management policies by incorporating the dynamic effects of management on future productivity when biological response is uncertain. Markovian decision analysis is used to identify optimal beef cow management on a ranch typical of the Sandhills region of Nebraska. Issues of breeding season l...

  17. The role of the safety analysis organization in steam generators replacement and reactor vessel head replacement evaluations

    International Nuclear Information System (INIS)

    Choe, Whee G.; Boatwright, W.J.

    2004-01-01

    When a major component in a nuclear power plant is replaced, especially the steam generators, the plant operator is presented a rare opportunity to learn from operating experience and significantly improve the performance, reliability and robustness of the plant. In addition to the use of improved materials, improved design margins can be built into the component specification that can later be used to provide meaningful operating margins. A Safety Analysis organization that is well-integrated with other plant organizations and possesses a detailed knowledge of the plant design and licensing bases can effectively balance the wants and needs of each organization to optimize the benefits realized by the plant as a whole. Knowledge of the assumptions, limitations, and available margins, both analytical and operating, can be used to specify a replacement steam generator design that optimizes costs and operating improvements. The work scope required to support the new design can be controlled through carefully selected and evaluated restrictions in operations, development of alternate operating strategies, and imposition of appropriate limitations. The important point is that the effective Safety Analysis organization must possess both the breadth and depth of knowledge of the plant design and operations and proactively use this information to support the replacement steam generator project. (author)

  18. Comparing replacement rates under private and federal retirement systems.

    Science.gov (United States)

    Martin, Patricia P

    One measure of the adequacy of retirement income is replacement rate - the percentage of pre-retirement salary that is available to a worker in retirement. This article compares salary replacement rates for private-sector employees of medium and large private establishments with those for federal employees under the Civil Service Retirement System and the Federal Employees Retirement System. Because there is no standard benefit formula to represent the variety of formulas available in the private sector, a composite defined benefit formula was developed using the characteristics of plans summarized in the Bureau of Labor Statistics Medium and Large Employer Plan Survey. The resulting "typical" private-sector defined benefit plan, with an accompanying defined contribution plan, was then compared with the two federal systems. The Civil Service Retirement System (CSRS) is a stand-alone defined benefit plan whose participants are not covered by Social Security. Until passage of the 1983 Amendments to Social Security Act, it was the only retirement plan for most federal civilian employees. Provisions of the 1983 Amendments were designed to restore long-term financial stability to the Social Security trust funds. One provision created the Federal Employees Retirement System (FERS), which covers federal employees hired after 1983. It was one of the provisions designed to restore long-term financial stability to the Social Security trust funds. FERS employees contribute to and are covered by Social Security. FERS, which is a defined benefit plan, also includes a basic benefit and a 401(k)-type plan known as the Thrift Savings Plan (TSP). To compare how retirees would fare under the three different retirement systems, benefits of employees retiring at age 65 with 35 years of service were calculated using hypothetical workers with steady earnings. Workers were classified according to a percentage of the average wage in the economy: low earners (45 percent), average earners

  19. [Valve-sparing Replacement in Patients with Aortic Root Dilatation].

    Science.gov (United States)

    Yamazaki, Kazuhiro; Minatoya, Kenji; Ueda, Ryoma; Takehara, Masato; Sakamoto, Kazuhisa; Ide, Yujiro; Kanemitsu, Hideo; Ueyama, Koji; Ikeda, Tadashi

    2018-01-01

    Valve-sparing root replacement is increasingly used to overcome drawbacks associated with valvular prostheses. In our institution, 7 patients underwent valve-sparing root replacement from August 2016 to July 2017. The mean age was 45 years (range, 14~69 years). Three patients had Marfan syndrome and 1 had Loeys-Dietz syndrome with acute aortic dissection. All patients underwent surgery with reimplantation technique using a Valsalva graft. Two patients required repair of aortic valve leaflet prolapse. All patients had an excellent clinical course, with mild or no aortic regurgitation and a decrease in end-diastolic volume on echocardiography. These results support the continued use of valve-sparing root replacement in selected patients.

  20. Software-based annunciator replacement: a tale of two projects

    International Nuclear Information System (INIS)

    Simmons, G.T.

    2015-01-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  1. Software-based annunciator replacement: a tale of two projects

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, G.T., E-mail: simmongt@westinghouse.com [Westinghouse Electric Company LLC, Cranberry Township, PA (United States)

    2015-07-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  2. Renal replacement lipomatosis: multidetector-row computed tomography findings in one case

    International Nuclear Information System (INIS)

    Calisir, C.; Can, C.; Kebapci, M.

    2007-01-01

    Replacement lipomatosis of the kidney is the result of severe atrophy of the renal parenchyma often caused by chronic calculus disease with secondary marked benign proliferation of fibrofatty tissue replacing atrophied renal parenchyma. Different radiological modalities have been used to illustrate this entity, with magnetic resonance imaging, ultrasound, intravenous pyelogram, and computed tomography (CT) used most frequently. We report multidedector CT (MDCT) findings of replacement lipomatosis in a 50-year-old woman. We think that it accurately provides a complete one-step diagnostic workup and appropriate pre-surgical planning for patients for whom there is a suspicion of replacement lipomatosis

  3. Risks and benefits of citrate anticoagulation for continuous renal replacement therapy.

    Science.gov (United States)

    Shum, H P; Yan, W W; Chan, T M

    2015-04-01

    Heparin, despite its significant side-effects, is the most commonly used anticoagulant for continuous renal replacement therapy in critical care setting. In recent years, citrate has gained much popularity by improving continuous renal replacement therapy circuit survival and decreasing blood transfusion requirements. However, its complex metabolic consequences warrant modification in the design of the citrate-based continuous renal replacement therapy protocol. With thorough understanding of the therapeutic mechanism of citrate, a simple and practicable protocol can be devised. Citrate-based continuous renal replacement therapy can be safely and widely used in the clinical setting with appropriate clinical staff training.

  4. The household decision making process in replacement of durable goods

    OpenAIRE

    Marell Molander, Agneta

    1998-01-01

    As durables are essential in many households, the level of ownership is high and, due to the high degree of penetration, a vast proportion of the current sales are replacement purchases. Even though a lot of research attention has been paid to decision making and decision processes many models are oriented towards non-durable goods and although a majority of purchases of many durable goods are replacements, few studies seem to make a distinction between a replacement purchase decision and a d...

  5. Potentiality Prediction of Electric Power Replacement Based on Power Market Development Strategy

    Science.gov (United States)

    Miao, Bo; Yang, Shuo; Liu, Qiang; Lin, Jingyi; Zhao, Le; Liu, Chang; Li, Bin

    2017-05-01

    The application of electric power replacement plays an important role in promoting the development of energy conservation and emission reduction in our country. To exploit the potentiality of regional electric power replacement, the regional GDP (gross domestic product) and energy consumption are taken as potentiality evaluation indicators. The principal component factors are extracted with PCA (principal component analysis), and the integral potentiality analysis is made to the potentiality of electric power replacement in the national various regions; a region is taken as a research object, and the potentiality of electric power replacement is defined and quantified. The analytical model for the potentiality of multi-scenario electric power replacement is developed, and prediction is made to the energy consumption with the grey prediction model. The relevant theoretical research is utilized to realize prediction analysis on the potentiality amount of multi-scenario electric power replacement.

  6. Replacement Condition Detection of Railway Point Machines Using an Electric Current Sensor

    Science.gov (United States)

    Sa, Jaewon; Choi, Younchang; Chung, Yongwha; Kim, Hee-Young; Park, Daihee; Yoon, Sukhan

    2017-01-01

    Detecting replacement conditions of railway point machines is important to simultaneously satisfy the budget-limit and train-safety requirements. In this study, we consider classification of the subtle differences in the aging effect—using electric current shape analysis—for the purpose of replacement condition detection of railway point machines. After analyzing the shapes of after-replacement data and then labeling the shapes of each before-replacement data, we can derive the criteria that can handle the subtle differences between “does-not-need-to-be-replaced” and “needs-to-be-replaced” shapes. On the basis of the experimental results with in-field replacement data, we confirmed that the proposed method could detect the replacement conditions with acceptable accuracy, as well as provide visual interpretability of the criteria used for the time-series classification. PMID:28146057

  7. Utilization of mine tailings as partial cement replacement

    DEFF Research Database (Denmark)

    Sigvardsen, Nina Marie; Nielsen, M.R.; Ottosen, Lisbeth M.

    2017-01-01

    Depositing mine tailings entail major economic costs and negative environmental impacts. Thus finding an alternative to depositing is of interest. This study focused on the use of mine tailings as partial cement replacement, thereby preventing depositing the mine tailings. At the same time......, such use would reduce the CO2 emission related to the production of cement. Mine tailings from two different mines Zinkgruvan (Sweden) and Nalunaq (Greenland) were both tested as 5 and 10 % cement replacement. All mortar specimens with mine tailings had lower compressive strength compared to a reference...... compared to a specimen containing a 10 % replacement of cement with coal fly ash, commonly used in Denmark. The compressive strength of specimens containing mine tailings exceeded the compressive strength of the specimen containing coal fly ash, indicating further the amorphous content of volcanic decent...

  8. Psychosocial determinants of outcomes in knee replacement.

    Science.gov (United States)

    Lopez-Olivo, Maria A; Landon, Glenn C; Siff, Sherwin J; Edelstein, David; Pak, Chong; Kallen, Michael A; Stanley, Melinda; Zhang, Hong; Robinson, Kausha C; Suarez-Almazor, Maria E

    2011-10-01

    To identify potential psychosocial and educational barriers to clinical success following knee replacement. The authors evaluated 241 patients undergoing total knee replacement, preoperatively and 6 months after surgery. Outcomes included the Western Ontario McMaster (WOMAC) scale and the Knee Society rating system (KSRS). Independent variables included: the medical outcome study-social support scale; depression, anxiety and stress scale; brief COPE inventory; health locus of control; arthritis self-efficacy scale and the life orientation test-revised. Multiple regression models evaluated associations of baseline demographic and psychosocial variables with outcomes at 6 months, controlling for body mass index, comorbidities and baseline outcome scores. Patients' mean age was 65 ± 9 years; 65% were women. Most patients improved outcomes after surgery. Several psychosocial variables were associated with outcomes. Regression analyses indicated lower education, less tangible support, depression, less problem-solving coping, more dysfunctional coping, lower internal locus of control were associated with worse WOMAC scores (R(2) contribution of psychosocial variables for pain 0.07; for function, 0.14). Older age, lower education, depression and less problem-solving coping were associated with poorer total KSRS scores (R(2) contribution of psychosocial variables to total KSRS model 0.09). Psychosocial variables as a set contributed from 25% to 74% of total explained variance across the models tested. Patients' level of education, tangible support, depression, problem-solving coping, dysfunctional coping and internal locus of control were associated with pain and functional outcomes after knee replacement. The findings suggest that, in addition to medical management, perioperative psychosocial evaluation and intervention are crucial in enhancing knee replacement outcomes.

  9. Performance of concrete with partial replacement of fine aggregates ...

    African Journals Online (AJOL)

    The study investigated the level of replacement of fine aggregate with waste glass that will result in optimal compressive strength. A total of 36 cubes were cast. 6 cubes without waste glass (control) and 30 cubes containing waste glass as partial replacement for fine aggregates at 15%, 25%, 35%, 45%, and 50%.

  10. Experimental and Numerical Study on the Dispersion Patterns and Penetration Properties of MEFP with Seven Arc-Cone Liners

    Directory of Open Access Journals (Sweden)

    JianFeng Liu

    Full Text Available Abstract A new MEFP warhead with seven arc-cone liners which can form 7, 13 or 19 penetrators at different standoffs is designed. Dispersion patterns and penetration properties of MEFP are performed on five #45 steel targets of dimension 160cm x 160cm x 1.5cm at various standoffs (45cm, 60cm, 80cm, 120cm, 170cm. It reaches the conclusion that every surrounding liner is broken into three penetrators during the formation process of MEFP and a group of aimable penetrators consisting a central projectile surrounded by 18 penetrators is finally formed. Maximum divergence angle of surrounding penetrator is 9.8° and the damage area reaches 0.37m2 at 1.7m. A nonlinear surface fitting about perforations information on the targets at different standoffs provides a method of predicting the dispersion patterns of MEFP. Once initiated, damage probability for defeating light armor of MEFP warhead with seven arc-cone liners is significantly improved and the results provide important reference to the design and optimization of MEFP warhead in engineering.

  11. Associated-particle sealed-tube neutron generators and hodoscopes for NDA applications

    International Nuclear Information System (INIS)

    Rhodes, E.; Peters, C.W.

    1991-01-01

    With radioisotope sources, gamma-ray transmission hodoscopes can inspect canisters and railcars to monitor rocket motors, can detect nuclear warheads by their characteristic strong gamma-ray absorption, or can count nuclear warheads inside a missile by low-resolution tomography. Intrinsic gamma-ray radiation from warheads can also be detected in a passive mode. Neutron hodoscopes can use neutron transmission, intrinsic neutron emission, or reactions stimulated by a neutron source, in treaty verification roles. Gamma-ray and neutron hodoscopes can be combined with a recently developed neutron diagnostic probe system, based on a unique associated-particle sealed-tube neutron generator (APSTNG) that interrogates the object of interest with a low-intensity beam of 14-MeV neutrons, and that uses flight-time to electronically collimate transmitted neutrons and to tomographically image nuclides identified by reaction gamma-rays. Gamma-ray spectra of resulting neutron reactions identify nuclides associated with all major chemicals in chemical warfare agents, explosives, and drugs, as well as many pollutants and fissile and fertile special nuclear material. 5 refs., 12 figs

  12. Gentilly 2 divider plate replacement

    International Nuclear Information System (INIS)

    Forest, J.; Klisel, E.; McClellan, G.; Schnelder, W.

    1995-01-01

    The steam generators at the Gentilly 2 Nuclear Plant in operation since 1983 were built with primary divider plates of a bolted panel configuration. During a routine outage inspection, it was noted that two bolts had dislodged from the divider and were located lying in the primary head. Subsequent inspections revealed erosion damage to a substantial number of divider plate bolts and to a lesser extent, to the divider plate itself. After further inspection and repair the units were returned to operation, however, it was determined that a permanent replacement of the primary divider plates was going to be necessary. After evaluation of various options, it was decided that the panel type dividers would be replaced with a single piece floating design. The divider itself was to be of a one piece all-welded arrangement to be constructed from individual panels to be brought in through the manways. In view of the strength limitations of the bolted attachment of the upper seat bar to the tubesheet, a new welded seat bar was provided. To counteract erosion concerns, the new divider is fitted with erosion resistant inserts or weld buildup and with improved sealing features in order to minimize leakage and erosion. At an advanced stage in the design and manufacture of the components, the issue of divider strength during LOCA conditions came into focus. Analysis was performed to determine the strength and/or failure characteristics of the divider to a variety of small and large LOCA conditions. The paper describes the diagnosis of the original divider plates and the design, manufacture, field mobilization, installation and subsequent operation of the replacement divider plates. (author)

  13. Esophageal Replacement for Long-Gap Esophageal Atresia in a ...

    African Journals Online (AJOL)

    humility to know when to consider a replacement procedure (3). To replace the esophagus of a baby is a major decision in many pediatric surgical units world over. Fortunately, the need for this procedure has decreased in the recent years due to the increase in the variety of techniques of lengthening the upper esophageal ...

  14. A model for an economically optimal replacement of a breeder flock.

    Science.gov (United States)

    Yassin, Hurria; Velthuis, Annet G J; Giesen, Gerard W J; Oude Lansink, Alfons G J M

    2012-12-01

    A deterministic model is developed to support the tactical and operational replacement decisions at broiler breeder farms. The marginal net revenue approach is applied to determine the optimal replacement age of a flock. The objective function of the model maximizes the annual gross margin over the flock's production cycle. To calculate the gross margin, future egg production, fertility, or hatchability of the eggs, revenues and variable costs of a flock were estimated. For tactical decisions, the optimal laying length is the age at which the average gross margin of an average flock is maximal. For operational decisions, a flock should be replaced when the marginal gross margin of a replaceable flock is less than the average gross margin of an average flock. To demonstrate the model, a broiler breeder flock from a Dutch breeder farm was used. A sensitivity analysis showed that the optimal replacement decision, for both tactical and operational management, is sensitive to the decrease in the weekly egg production after the peak and the prices of feed and hatching eggs. The effect of the decrease in weekly fertility after the peak on the replacement decision is related to the payment system for hatching eggs.

  15. Optimal elastomeric scaffold leaflet shape for pulmonary heart valve leaflet replacement.

    Science.gov (United States)

    Fan, Rong; Bayoumi, Ahmed S; Chen, Peter; Hobson, Christopher M; Wagner, William R; Mayer, John E; Sacks, Michael S

    2013-02-22

    Surgical replacement of the pulmonary valve (PV) is a common treatment option for congenital pulmonary valve defects. Engineered tissue approaches to develop novel PV replacements are intrinsically complex, and will require methodical approaches for their development. Single leaflet replacement utilizing an ovine model is an attractive approach in that candidate materials can be evaluated under valve level stresses in blood contact without the confounding effects of a particular valve design. In the present study an approach for optimal leaflet shape design based on finite element (FE) simulation of a mechanically anisotropic, elastomeric scaffold for PV replacement is presented. The scaffold was modeled as an orthotropic hyperelastic material using a generalized Fung-type constitutive model. The optimal shape of the fully loaded PV replacement leaflet was systematically determined by minimizing the difference between the deformed shape obtained from FE simulation and an ex-vivo microCT scan of a native ovine PV leaflet. Effects of material anisotropy, dimensional changes of PV root, and fiber orientation on the resulting leaflet deformation were investigated. In-situ validation demonstrated that the approach could guide the design of the leaflet shape for PV replacement surgery. Copyright © 2012 Elsevier Ltd. All rights reserved.

  16. Replacement of Fine Aggregate by using Recyclable Materials in Paving Blocks

    Science.gov (United States)

    Koganti, Shyam Prakash; Hemanthraja, Kommineni; Sajja, Satish

    2017-08-01

    Cement concrete paving blocks are precast hard products complete out of cement concrete. The product is made in various sizes and shapes like square, round and rectangular blocks of different dimensions with designs for interlocking of adjacent tiles blocks. Several Research Works have been carried out in the past to study the possibility of utilizing waste materials and industrial byproducts in the manufacturing of paver blocks. Various industrial waste materials like quarry dust, glass powder, ceramic dust and coal dust are used as partial replacement of fine aggregate and assessed the strength parameters and compared the profit percentages after replacement with waste materials. Quarry dust can be replaced by 20% and beyond that the difference in strength is not much higher but considering cost we can replace upto 40% so that we can get a profit of almost 10%. Similarly we can replace glass powder and ceramic dust by 20% only beyond that there is decrement in strength and even with 20% replacement we can get 1.34 % and 2.42% of profit. Coal dust is not suitable for alternative material as fine aggregate as it reduces the strength.

  17. Enzyme Replacement Therapy for Fabry Disease

    Directory of Open Access Journals (Sweden)

    Maria Dolores Sanchez-Niño PhD

    2016-11-01

    Full Text Available Fabry disease is a rare X-linked disease caused by the deficiency of α-galactosidase that leads to the accumulation of abnormal glycolipid. Untreated patients develop potentially lethal complications by age 30 to 50 years. Enzyme replacement therapy is the current standard of therapy for Fabry disease. Two formulations of recombinant human α-galactosidase A (agalsidase are available in most markets: agalsidase-α and agalsidase-β, allowing a choice of therapy. However, the US Food and Drug Administration rejected the application for commercialization of agalsidase-α. The main difference between the 2 enzymes is the dose. The label dose for agalsidase-α is 0.2 mg/kg/2 weeks, while the dose for agalsidase-β is 1.0 mg/kg/2 weeks. Recent evidence suggests a dose-dependent effect of enzyme replacement therapy and agalsidase-β is 1.0 mg/kg/2 weeks, which has been shown to reduce the occurrence of hard end points (severe renal and cardiac events, stroke, and death. In addition, patients with Fabry disease who have developed tissue injury should receive coadjuvant tissue protective therapy, together with enzyme replacement therapy, to limit nonspecific progression of the tissue injury. It is likely that in the near future, additional oral drugs become available to treat Fabry disease, such as chaperones or substrate reduction therapy.

  18. Patellofemoral Joint Replacement and Nickel Allergy: An Unusual Presentation

    Directory of Open Access Journals (Sweden)

    Farhan Syed

    2015-01-01

    Full Text Available Metal allergy is an unusual complication of joint replacement that may cause aseptic loosening and necessitate joint revision surgery. We present the case of nickel allergy causing aseptic loosening following patellofemoral joint replacement (PFJR in a 54-year-old male. Joint revision surgery to a nickel-free total knee replacement was performed with good results. Our literature review shows that there is no evidence to guide the management of metal allergy in PFJR. The evidence from studies of total knee replacement is limited to retrospective case series and case reports and gives contradictory recommendations. The optimal management strategy for metal allergy in PFJR is not clear. We recommend allergy testing in patients with history of metal allergy and use of an allergen-free implant in those with positive tests. As there is no gold standard test to establish metal allergy, the choice of test should be guided by availability and recommendation from the local unit of dermatology and allergy testing. We recommend investigation for metal allergy in patients with implant loosening where other causes have been excluded.

  19. Strategic provisioning of replacement parts for CANDU power plants

    International Nuclear Information System (INIS)

    Mizuno, G.; Tume, P.; Prentice, J.

    2000-01-01

    Provisioning of replacement parts and management of critical spares are key factors in optimizing maintenance programs for CANDU power plants. With a view to supply assurance, Atomic Energy Canada Limited (AECL) has created a Spare Parts Branch (SPB) to provide a clear pipeline from the client to the delivered replacement part(s). SPB provides the client with assured access to a qualified supplier database, computer aided design, engineering and manufacturing services and material upgrades and design registration through the authorized inspection agency. The AECL spare parts strategic provisioning service plan that has four thrusts: 1) the efficient delivery of cost-effective replacement parts; 2) obsolete parts resolution; 3) a website that will provide our clients with real-time access to replacement part data; and 4) inventory recovery opportunities. Thrusts one and two are actively ensuring plant maintenance for on-shore and off-shore CANDU clients. Thrusts three and four are longer-term commitments. This paper will explore these thrusts in the context of our CANDU business practices. (author)

  20. In-core monitor housing replacement at Fukushima Daiichi Unit No.4

    International Nuclear Information System (INIS)

    Arai, Tomoyuki

    1999-01-01

    The in-core monitor (ICM) housing replacement of a Boiling Water Reactor (BWR) has been completed at Fukushima-Daiichi Unit No. 4 (1F4) of the Tokyo Electric Power Company (TEPCO) in Japan. Since cracking of the inside surface of an ICM housing was found in this unit, the ICM housing was replaced with one made of low-carbon stainless steel (SS) to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. This project is the first application of the replacement procedure for the ICM housing and employs various advanced technologies. The outline of the ICM housing replacement project and applied technologies are discussed in this paper. (author)

  1. Prosthetic valve sparing aortic root replacement: an improved technique.

    Science.gov (United States)

    Leacche, Marzia; Balaguer, Jorge M; Umakanthan, Ramanan; Byrne, John G

    2008-10-01

    We describe a modified surgical technique to treat patients with a previous history of isolated aortic valve replacement who now require aortic root replacement for an aneurysmal or dissected aorta. This technique consists of replacing the aortic root with a Dacron conduit, leaving intact the previously implanted prosthesis, and re-implanting the coronary arteries in the Dacron graft. Our technique differs from other techniques in that we do not leave behind any aortic tissue remnant and also in that we use a felt strip to obliterate any gap between the old sewing ring and the newly implanted graft. In our opinion, this promotes better hemostasis. We demonstrate that this technique is safe, feasible, and results in acceptable outcomes.

  2. U.S. oil import vulnerability: The technical replacement capability. Summary

    International Nuclear Information System (INIS)

    1991-10-01

    The report examines the changes that have taken place in world oil markets and the U.S. economy since 1984 and provides revised estimates of the technical oil replacement potential that might be attained in the event of a severe and long lasting cutoff of imported oil. The analysis focuses on technologies that are commercially available today or will be within the next 5 years and that are among the most cost-effective methods for replacing oil use in applicable sectors. It also considers the economic impacts of adopting an aggressive oil replacement strategy in a severe oil emergency. The report presents a variety of policy options that could help accelerate the adoption of oil replacement technologies in preparation for, or in response to, a severe supply disruption, or as part of a long-term national policy to reduce import vulnerability. The report's conclusion that U.S. capability to replace lost oil imports is shrinking should be sobering to those who believe that there are quick and easy technological solutions, or that market forces alone will be sufficient to overcome the substantial economic and social dislocations that could result from a prolonged major oil disruption

  3. The replacement value of groundnut cake with cooked Bambara ...

    African Journals Online (AJOL)

    Seventy five day-old Anak 2000 broiler chicks were randomly allotted to five dietary treatments 1, 2, 3, 4 and 5 in which groundnut cake (GNC) was replaced by cooked bambara groundnut meal (CBGM) at 0, 25, 50, 75 and 100% levels of inclusion for both starter and finisher phases. Replacement levels of cooked bambara ...

  4. Clinical and radiographic evaluation of modular knee replacement

    International Nuclear Information System (INIS)

    Cartier, P.; Mammeri, M.; Villers, P.

    1982-01-01

    Ninety-five modular total knee replacements, 54 of them unicompartmental, have been reviewed. The average follow-up was three years. The major indication for operation was pain. A precise preoperative radiographic evaluation and a technique for a positioning the components are described. This had led to a significant improvement in the clinical and radiographic results in 67 out of 95 knees which were operated on. The modifications concern the orientation of the tibial cut, the placing of the femoral components and the correction of axial deviation. The main causes of the 13% of failures in our series were either errors in positioning the components or a preoperative diagnosis of rheumatoid arthritis. Unicompartmental replacement gave similar results in both valgus and varus knees, and the morbidity was lower than in the bicompartmental replacements. The best results were obtained in osteoarthristic knees in elderly patients and in posttraumatic osteoarthritis. (orig.)

  5. Optimal Overhaul-Replacement Policies for Repairable Machine Sold with Warranty

    OpenAIRE

    Soemadi, Kusmaningrum; Iskandar, Bermawi P; Taroepratjeka, Harsono

    2014-01-01

    This research deals with an overhaul-replacement policy for a repairable machine sold with Free Replacement Warranty (FRW). The machine will be used for a finite horizon, T (T <), and evaluated at a fixed interval, s (s< T). At each evaluation point, the buyer considers three alternative decisions i.e. Keep the machine, Overhaul it, or Replace it with a new identical one. An overhaul can reduce the machine age virtually, but not to a point that the machine is as good as new. If the mac...

  6. Penentuan Interval Waktu Penggantian Optimal Komponen Berdasarkan Model Opportunity Based-Age Replacement

    OpenAIRE

    Giatman, Muhammad

    2008-01-01

    Maintenance system, especially replacement that is not good, can cause much lose out for the company. The lose out is caused production process disturbing bay unexpectadly or unscheduled replacement. This will lose out for factory that have continue flow shop type, because replacement of the component that is need shut down machine will cause all machine in the process production stop. To anticipate of lose out that cause by replacement activity, so in this research will search interval of op...

  7. Logistic Vehicle System Replacement Cost Estimate

    National Research Council Canada - National Science Library

    Stinson, Margaret

    1998-01-01

    The Logistics Vehicle System (LVS) was originally fielded from 1985-1989. Most of the LVS fleet will reach end-of-service life in 2005, therefore the goal of the Logistics Vehicle System Replacement (LVSR...

  8. 25 CFR 700.155 - Expenses in searching for replacement dwelling-residential move.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Expenses in searching for replacement dwelling... Expenses in searching for replacement dwelling—residential move. (a) A certified eligible head of household is entitled to actual reasonable expenses incurred in the search for a replacement dwelling. (b...

  9. Why are U.S. nuclear weapon modernization efforts controversial?

    Science.gov (United States)

    Acton, James

    2016-03-01

    U.S. nuclear weapon modernization programs are focused on extending the lives of existing warheads and developing new delivery vehicles to replace ageing bombers, intercontinental ballistic missiles, and ballistic missile submarines. These efforts are contested and controversial. Some critics argue that they are largely unnecessary, financially wasteful and potentially destabilizing. Other critics posit that they do not go far enough and that nuclear weapons with new military capabilities are required. At its core, this debate centers on three strategic questions. First, what roles should nuclear weapons be assigned? Second, what military capabilities do nuclear weapons need to fulfill these roles? Third, how severe are the unintended escalation risks associated with particular systems? Proponents of scaled-down modernization efforts generally argue for reducing the role of nuclear weapons but also that, even under existing policy, new military capabilities are not required. They also tend to stress the escalation risks of new--and even some existing--capabilities. Proponents of enhanced modernization efforts tend to advocate for a more expansive role for nuclear weapons in national security strategy. They also often argue that nuclear deterrence would be enhanced by lower yield weapons and/or so called bunker busters able to destroy more deeply buried targets. The debate is further fueled by technical disagreements over many aspects of ongoing and proposed modernization efforts. Some of these disagreements--such as the need for warhead life extension programs and their necessary scope--are essentially impossible to resolve at the unclassified level. By contrast, unclassified analysis can help elucidate--though not answer--other questions, such as the potential value of bunker busters.

  10. Evaluation of depreciation costs in replacement investments of nuclear power plants

    International Nuclear Information System (INIS)

    Nakada, Shoji; Takashima, Ryuta; Nagano, Koji; Kimura, Hiroshi; Madarame, Haruki

    2010-01-01

    Replacement of nuclear power plants has the possibility of affecting the management of electric power suppliers. Therefore, in the nuclear policy, a depreciation method as an equalization method, which means that part of the investment cost is accumulated as an allowance, and after the start of operation, the depreciation cost in the replacement project is equalized, has been introduced in Japan. In this paper, we evaluate the replacement of nuclear power plants by taking into account the uncertainty of operating costs and the depreciation cost in order to examine the effect of the depreciation method on the decision criteria of the replacement.We found that the equalization method is elective for inducing the acceleration of the replacement. Furthermore, we show the relationship between the uncertainty and the depreciation method. It turns out that as uncertainty increases, the difference in investment threshold between the equalization method and the existing depreciation method decreases, and that in option value increases. (author)

  11. Finite element study of a lumbar intervertebral disc nucleus replacement device

    Directory of Open Access Journals (Sweden)

    Jessica S Coogan

    2016-12-01

    Full Text Available Nucleus replacement technologies are a minimally invasive alternative to spinal fusion and total disc replacement that have the potential to reduce pain and restore motion for patients with degenerative disc disease. Finite element modeling can be used to determine the biomechanics associated with nucleus replacement technologies. The current study focuses on a new nucleus replacement device designed as a conforming silicone implant with an internal void. A validated finite element model of the human lumbar L3-L4 motion segment was developed and used to investigate the influence of the nucleus replacement device on spine biomechanics. In addition, the effect of device design changes on biomechanics was determined. A 3D, L3-L4 finite element model was constructed from medical imaging data. Models were created with the normal intact nucleus, the nucleus replacement device, and a solid silicone implant. Probabilistic analysis was performed on the normal model to provide quantitative validation metrics. Sensitivity analysis was performed on the silicone Shore A durometer of the device. Models were loaded under axial compression followed by flexion/extension, lateral bending, or axial rotation. Compressive displacement, endplate stresses, reaction moment, and annulus stresses were determined and compared between the different models. The novel nucleus replacement device resulted in similar compressive displacement, endplate stress, and annulus stress and slightly higher reaction moment compared with the normal nucleus. The solid implant resulted in decreased displacement, increased endplate stress, decreased annulus stress, and decreased reaction moment compared with the novel device. With increasing silicone durometer, compressive displacement decreased, endplate stress increased, reaction moment increased, and annulus stress decreased. Finite element analysis was used to show that the novel nucleus replacement device results in similar biomechanics

  12. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.; Horlock, K.

    2001-01-01

    The contract for the design, construction and commissioning of the Replacement Research Reactor was signed in July 2000. This was followed by the completion of the detailed design and an application for a construction licence was made in May 2001. This paper will describe the main elements of the design and their relation to the proposed applications of the reactor. The future stages in the project leading to full operation are also described

  13. 75 FR 71548 - Clarification of the Post Office Box Lock Replacement Fee

    Science.gov (United States)

    2010-11-24

    ... POSTAL SERVICE 39 CFR Part 111 Clarification of the Post Office Box Lock Replacement Fee AGENCY... of the lock replacement fee for Post Office TM boxes to reflect current practice. DATES: January 2... Standards for Domestic Mailing Services (75 FR 39477-39492). The applicability of the lock replacement fee...

  14. Flow boiling test of GDP replacement coolants

    International Nuclear Information System (INIS)

    Park, S.H.

    1995-01-01

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C 4 F 10 and C 4 F 8 , were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C 4 F 10 mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C 4 F 10 weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd

  15. The metabolic consequences of thyroxine replacement in adult hypopituitary patients

    DEFF Research Database (Denmark)

    Filipsson Nyström, Helena; Feldt-Rasmussen, Ulla; Kourides, Ione

    2012-01-01

    The metabolic consequences of thyroxine replacement in patients with central hypothyroidism (CH) need to be evaluated. The aim was to examine the outcome of thyroxine replacement in CH. Adult hypopituitary patients (n = 1595) with and without CH from KIMS (Pfizer International Metabolic Database...

  16. Primary extra-cranial meningioma following total hip replacement

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, T.J.; Beggs, I. [Royal Infirmary, Department of Radiology, Edinburgh (United Kingdom); Patton, J.T.; Porter, D. [Royal Infirmary, Department of Orthopaedics, Edinburgh (United Kingdom); Salter, D.M.; Al-Nafussi, A. [Royal Infirmary, Department of Pathology, Edinburgh (United Kingdom)

    2009-01-15

    A 61-year-old man presented with pain at the left hip and decreased mobility 10 years after total hip replacement. Imaging demonstrated a large destructive expansile mass adjacent to the prosthesis. Histological analysis confirmed the presence of an extra-cranial meningioma. Primary tumours after total hip replacement are rare and include soft tissue sarcomas, bone sarcomas and lymphomas. To our knowledge, no previous cases of primary extracranial meningioma have been identified. The imaging features, histology, pathogenesis and differential diagnosis are discussed. (orig.)

  17. Optimal replacement policy of products with repair-cost threshold after the extended warranty

    Institute of Scientific and Technical Information of China (English)

    Lijun Shang; Zhiqiang Cai

    2017-01-01

    The reliability of the product sold under a warranty is usually maintained by the manufacturer during the warranty period. After the expiry of the warranty, however, the consumer confronts a problem about how to maintain the reliability of the product. This paper proposes, from the consumer's perspective, a replace-ment policy after the extended warranty, under the assumption that the product is sold under the renewable free replacement warranty (RFRW) policy in which the replacement is dependent on the repair-cost threshold. The proposed replacement policy is the replacement after the extended warranty is performed by the consumer based on the repair-cost threshold or preventive replacement (PR) age, which are decision variables. The expected cost rate model is derived from the consumer's perspective. The existence and uniqueness of the optimal solution that minimizes the expected cost rate per unit time are offered. Finally, a numeri-cal example is presented to exemplify the proposed model.

  18. MILITARY RESEARCH: Researchers Target Flaws in Ballistic Missile Defense Plan.

    Science.gov (United States)

    Malakoff, D; Cho, A

    2000-06-16

    More than three dozen scientists journeyed to Washington, D.C., this week to warn lawmakers that a proposed $60 billion U.S. missile defense system, designed to knock incoming warheads out of the sky, is technically flawed because it can't pick out real warheads from decoys. Pentagon officials heatedly deny a new report by one scientist that contractors have rigged trials to hide the problem, although they admit that some tests were simplified to save time. In the wake of these events, a leading Democrat is urging President Bill Clinton to delay a pending decision on building the system.

  19. The Effect on Long-Term Survivorship of Surgeon Preference for Posterior-Stabilized or Minimally Stabilized Total Knee Replacement: An Analysis of 63,416 Prostheses from the Australian Orthopaedic Association National Joint Replacement Registry.

    Science.gov (United States)

    Vertullo, Christopher J; Lewis, Peter L; Lorimer, Michelle; Graves, Stephen E

    2017-07-05

    Controversy still exists as to the optimum management of the posterior cruciate ligament (PCL) in total knee arthroplasty. Surgeons can choose to kinematically substitute the PCL with a posterior-stabilized total knee replacement or alternatively to utilize a cruciate-retaining, also known as minimally stabilized, total knee replacement. Proponents of posterior-stabilized total knee replacement propose that the reported lower survivorship in registries when directly compared with minimally stabilized total knee replacement is due to confounders such as selection bias because of the preferential usage of posterior-stabilized total knee replacement in more complex or severe cases. In this study, we aimed to eliminate these possible confounders by performing an instrumental variable analysis based on surgeon preference to choose either posterior-stabilized or minimally stabilized total knee replacement, rather than the actual prosthesis received. Cumulative percent revision, hazard ratio (HR), and revision diagnosis data were obtained from the Australian Orthopaedic Association National Joint Replacement Registry from September 1, 1999, to December 31, 2014, for 2 cohorts of patients, those treated by high-volume surgeons who preferred minimally stabilized replacements and those treated by high-volume surgeons who preferred posterior-stabilized replacements. All patients had a diagnosis of osteoarthritis and underwent fixed-bearing total knee replacement with patellar resurfacing. At 13 years, the cumulative percent revision was 5.0% (95% confidence interval [CI], 4.0% to 6.2%) for the surgeons who preferred the minimally stabilized replacements compared with 6.0% (95% CI, 4.2% to 8.5%) for the surgeons who preferred the posterior-stabilized replacements. The revision risk for the surgeons who preferred posterior-stabilized replacements was significantly higher for all causes (HR = 1.45 [95% CI, 1.30 to 1.63]; p total knee replacement compared with the patients of

  20. Replacing soybean meal for cottonseed meal on performance of lactating dairy cows.

    Science.gov (United States)

    Imaizumi, Hugo; De Souza, Jonas; Batistel, Fernanda; Santos, Flávio Augusto Portela

    2016-01-01

    Cottonseed meal (CSM) is an alternative source of protein, and previous studies have been shown that it can replace soybean meal (SBM) without decrease animal performance. However, Brazilian CSM has a different chemical composition compared with the usual CSM reported in the literature. The objective of this experiment was to evaluate the effects of replacing SBM for Brazilian CSM on performance and energy balance of mid-lactating dairy cows. Forty-two Holstein cows were used in a replicate 3 × 3 Latin square design. Increasing contents of CSM (0, 15, and 30% of dry matter (DM)) were fed in diets to replace SBM. Milk yield and feed efficiency were linearly reduced with the replacement of CSM for SBM (P = 0.001). Milk fat content tended to increase quadratically (P = 0.07) with CSM addition. Replacing SBM for CSM affected milk protein content quadratically (P = 0.05). Milk urea nitrogen and plasma urea nitrogen (PUN) tended to respond quadratically (P = 0.06 and 0.10) when CSM replaced SBM to the diets. Variation in body weight (BW) also responded quadratically as CSM replaced SBM (P = 0.05). Altogether, the findings suggest better performance when cows receive SBM diet compared with the Brazilian CSM diet.

  1. Experimental replacement of esophagus with a short segment of trachea.

    Science.gov (United States)

    Abbasidezfouli, Azizollah; Ansari, Damoon; Sheikhy, Kambiz; Abarkar, Mohammad; Sadeghbeigi, Farahnaz; Abbasidezfouli, Sepehr; Sharifi, Davood

    2016-03-01

    Segmental resection of esophagus with primary anastomosis is prohibited because of the risk of dehiscence. We previously have shown that replacement of a segment of cervical esophagus with a tracheal segment of the same length could successfully be performed in a canine model. In this study, we sought to assess the feasibility of replacement of the esophageal defect with a shorter segment of trachea. In five mongrel dogs weighting 20-30 kg, under general anesthesia and after a cervical incision, 8 cm of the cervical esophagus was resected and replaced by a 4-cm segment of the adjacent trachea. The animals were evaluated clinically for signs and symptoms of stenosis and dehiscence and then euthanized after 2 mo of follow-up. All dogs recovered from surgery and started regular diet on the seventh postoperative day. No clinical or endoscopic sign of stenosis or voice change was seen. Squamous metaplasia and atrophy of mucosal glands and cartilage were detected in the histopathologic examination of the replaced segments. Replacement of a cervical esophageal defect with a shorter segment of trachea can be performed successfully in dogs. This procedure can be potentially used for the treatment of cervical esophageal lesions in humans. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. Optimal glucocorticoid replacement in adrenal insufficiency.

    Science.gov (United States)

    Øksnes, Marianne; Ross, Richard; Løvås, Kristian

    2015-01-01

    Adrenal insufficiency (glucocorticoid deficiency) comprises a group of rare diseases, including primary adrenal insufficiency, secondary adrenal insufficiency and congenital adrenal hyperplasia. Lifesaving glucocorticoid therapy was introduced over 60 years ago, but since then a number of advances in treatment have taken place. Specifically, little is known about short- and long-term treatment effects, and morbidity and mortality. Over the past decade, systematic cohort and registry studies have described reduced health-related quality of life, an unfavourable metabolic profile and increased mortality in patients with adrenal insufficiency, which may relate to unphysiological glucocorticoid replacement. This has led to the development of new modes of replacement that aim to mimic normal glucocorticoid physiology. Here, evidence for the inadequacy of conventional glucocorticoid therapy and recent developments in treatment are reviewed, with an emphasis on primary adrenal insufficiency. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Apixaban or enoxaparin for thromboprophylaxis after knee replacement

    DEFF Research Database (Denmark)

    Lassen, Michael Rud; Raskob, Gary E; Gallus, Alexander

    2009-01-01

    BACKGROUND: The optimal strategy for thromboprophylaxis after major joint replacement has not been established. Low-molecular-weight heparins such as enoxaparin predominantly target factor Xa but to some extent also inhibit thrombin. Apixaban, a specific factor Xa inhibitor, may provide effective...... (P=0.03). CONCLUSIONS: As compared with enoxaparin for efficacy of thromboprophylaxis after knee replacement, apixaban did not meet the prespecified statistical criteria for noninferiority, but its use was associated with lower rates of clinically relevant bleeding and it had a similar adverse...

  4. Optimal Replacement Policies for Non-Uniform Cache Objects with Optional Eviction

    National Research Council Canada - National Science Library

    Bahat, Omri; Makowski, Armand M

    2002-01-01

    .... However, since the introduction of optimal replacement policies for conventional caching, the problem of finding optimal replacement policies under the factors indicated has not been studied in any systematic manner...

  5. Optimization of steam generator replacement with virtual reality modeling

    International Nuclear Information System (INIS)

    Kim, Jeong H.; Suh, Kune Y.

    2008-01-01

    Nuclear power plants (NPPs) have to be carefully examined and maintained up to the point of replacing major components during the overhaul period for continued operation. Most understandably the cost of maintenance and upgrading will tend to increase with the NPP power. There is thus an escalating need for developing an optimized process management method to reduce the cost involved. Albeit the steam generators (SGs) may not directly affect the expected lifespan of NPP, thousands of tubes with diameter on the order of 3 cm in the SG operating at 320degC and 16 MPa may well tend to be called Achilles' heel of the pressurized water reactors (PWRs). For instance, the SGs of Kori Nuclear Unit 1 (KNU 1) were replaced in October 1998 after 20 years of service on account of aging and potential threat to operational safety. In the same year the SG tubes of Ulchin Nuclear Units 1 and 2 were ruptured to result in leakage of the primary coolant to the secondary side. As a result their SGs are planned to be replaced in a few years. There is, however, a limit to improving the replacement process by trial and error in practice on account of the size of NPP with the ensuing complexity in process management. This paper proposes an optimization method for the SG replacement process based on the KNU 1 experience in 1998. The whole process was simulated accounting for interactions of each part in virtual reality utilizing the computer aided design solution CATIA, and the digital process management solution DELMIA. (author)

  6. ARP/wARP and molecular replacement: the next generation

    International Nuclear Information System (INIS)

    Cohen, Serge X.; Ben Jelloul, Marouane; Long, Fei; Vagin, Alexei; Knipscheer, Puck; Lebbink, Joyce; Sixma, Titia K.; Lamzin, Victor S.; Murshudov, Garib N.; Perrakis, Anastassis

    2008-01-01

    A systematic test shows how ARP/wARP deals with automated model building for structures that have been solved by molecular replacement. A description of protocols in the flex-wARP control system and studies of two specific cases are also presented. Automatic iterative model (re-)building, as implemented in ARP/wARP and its new control system flex-wARP, is particularly well suited to follow structure solution by molecular replacement. More than 100 molecular-replacement solutions automatically solved by the BALBES software were submitted to three standard protocols in flex-wARP and the results were compared with final models from the PDB. Standard metrics were gathered in a systematic way and enabled the drawing of statistical conclusions on the advantages of each protocol. Based on this analysis, an empirical estimator was proposed that predicts how good the final model produced by flex-wARP is likely to be based on the experimental data and the quality of the molecular-replacement solution. To introduce the differences between the three flex-wARP protocols (keeping the complete search model, converting it to atomic coordinates but ignoring atom identities or using the electron-density map calculated from the molecular-replacement solution), two examples are also discussed in detail, focusing on the evolution of the models during iterative rebuilding. This highlights the diversity of paths that the flex-wARP control system can employ to reach a nearly complete and accurate model while actually starting from the same initial information

  7. Functionality of Inulin as a Sucrose Replacer in Cookie Baking

    Science.gov (United States)

    Inulin was evaluated as a sucrose replacer for healthy cookie production with benefits of low glycemic impact and prebiotic soluble fiber. Sucrose (as a reference) and three inulin products of different concentrations (as soluble fibers) were used to explore the effects of sugar-replacer type on so...

  8. Continuous renal replacement therapy for critically ill infants and children

    DEFF Research Database (Denmark)

    Pedersen, Ole; Jepsen, Søren Bruun; Toft, Palle

    2012-01-01

    Continuous renal replacement therapy (CRRT) is an important treatment in critically ill children with acute kidney injury (AKI). Over the past decade, CRRT has been the preferred method of renal replacement therapy. We compared children with CRRT-treated adults with AKI in terms of return of kidney...

  9. Embedded piezoelectrics for sensing and energy harvesting in total knee replacement units

    Science.gov (United States)

    Wilson, Brooke E.; Meneghini, Michael; Anton, Steven R.

    2015-04-01

    The knee replacement is the second most common orthopedic surgical intervention in the United States, but currently only 1 in 5 knee replacement patients are satisfied with their level of pain reduction one year after surgery. It is imperative to make the process of knee replacement surgery more objective by developing a data driven approach to ligamentous balance, which increases implant life. In this work, piezoelectric materials are considered for both sensing and energy harvesting applications in total knee replacement implants. This work aims to embed piezoelectric material in the polyethylene bearing of a knee replacement unit to act as self-powered sensors that will aid in the alignment and balance of the knee replacement by providing intraoperative feedback to the surgeon. Postoperatively, the piezoelectric sensors can monitor the structural health of the implant in order to perceive potential problems before they become bothersome to the patient. Specifically, this work will present on the use of finite element modeling coupled with uniaxial compression testing to prove that piezoelectric stacks can be utilized to harvest sufficient energy to power sensors needed for this application.

  10. Investment, replacement and scrapping in a vintage capital model with embodied technological change

    OpenAIRE

    Bitros, George C.; Hritonenko, Natali; Yatsenko, Yuri

    2007-01-01

    This paper analyzes and compares two alternative policies of determining the service life and replacement demand for vintage equipment under embodied technological change. The policies are the infinite-horizon replacement and the transitory replacement ending with scrapping. The corresponding vintage capital models are formulated in the dynamic optimization framework. These two approaches lead to different estimates of the duration of replacements and the impact of technological change on the...

  11. 5/8'' baffle bolt replacement

    International Nuclear Information System (INIS)

    Pinaud, T.; Grypczynski, D.

    1999-01-01

    Both Framatome Nuclear Services in France and its U.S. arm, FT1, are now equipped with baffle bolt inspection and replacement packages. These packages allow them to tackle baffle bold degradation on both two- and three-loop nuclear power plants. Framatome and FT1 together are world leaders in addressing reactor vessel internal bolting concerns

  12. Testing of Replacement Bag Material

    International Nuclear Information System (INIS)

    Laurinat, J.E.

    1998-01-01

    Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties

  13. Adaptive Neuro-fuzzy Inference System as Cache Memory Replacement Policy

    Directory of Open Access Journals (Sweden)

    CHUNG, Y. M.

    2014-02-01

    Full Text Available To date, no cache memory replacement policy that can perform efficiently for all types of workloads is yet available. Replacement policies used in level 1 cache memory may not be suitable in level 2. In this study, we focused on developing an adaptive neuro-fuzzy inference system (ANFIS as a replacement policy for improving level 2 cache performance in terms of miss ratio. The recency and frequency of referenced blocks were used as input data for ANFIS to make decisions on replacement. MATLAB was employed as a training tool to obtain the trained ANFIS model. The trained ANFIS model was implemented on SimpleScalar. Simulations on SimpleScalar showed that the miss ratio improved by as high as 99.95419% and 99.95419% for instruction level 2 cache, and up to 98.04699% and 98.03467% for data level 2 cache compared with least recently used and least frequently used, respectively.

  14. Optimization of costs for the DOEL 3 steam generator replacement

    International Nuclear Information System (INIS)

    Leblois, C.

    1994-01-01

    Several aspects of steam generator replacement economics are discussed on the basis of the recent replacement carried out in the Doel 3 unit. The choice between repair of replacement policies, as well as the selection of the intervention date were based on a comparison of costs in which various possible scenarios were examined. The contractual approach for the different works to be performed was also an important point, as well as the project organization in which CAD played an important role. This organization allowed to optimize the outage duration and to realize numerous interventions in the reactor building in parallel with the replacement itself. A last aspect of the optimization of costs is the possibility to uprate the plant power. In the case of Doel 3, the plant restarted with a nominal power increased by 10%, of which 5,7% were possible by the increase of the SG heat transfer area. (Author) 6 refs

  15. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  16. Are output measurements always necessary after CT tube replacement?

    Directory of Open Access Journals (Sweden)

    Paul J Stauduhar

    2014-03-01

    Full Text Available Purpose: TX regulations and the ACR require that CT radiation output be measured within 30 days of major service. The most common major service is tube replacement. We hypothesized that historical QC data could be used instead to determine if output measurements are necessary, reducing the need for costly output measurements.Methods: We reviewed 66 records of tube replacements to determine with what frequency output falls outside specifications. We also conducted an experiment to verify that clinically significant output changes could be identified by comparing image noise in historical QC data with the same data after tube replacement. We used 30 days of historical QC data to establish a baseline noise level and 95% confidence interval (CI for individual noise measurements. To simulate output changes, we acquired phantom images with our QC protocol while manually changing output (mA. We acquired 10 images using the baseline output and 10 images at each different “output”. We evaluated individual images and subsets of images at each “output” to determine if the system was within the manufacturer’s specifications.Results: None of the 66 tube replacements resulted in an output change that exceeded specifications. Analysis of 30 days of historic QC data for our experimental system indicated a mean noise of 5.4 HU with 95% CI of 5.1 ‒ 5.7 HU. When using the mean noise of 10 images acquired at each of the varying outputs, we were able to identify, with 100% accuracy, images acquired at outputs outside manufacturer’s specifications.Conclusion: The results of our review of historical tube replacement data indicated the likelihood of output falling outside manufacturer’s specifications is low. Considering this, it is likely that by using QC data from programs required by regulation and the ACR physicists can reliably verify radiation output stability remotely instead of making physical measurements.--------------------Cite this article

  17. Hardware replacements and software tools for digital control computers

    International Nuclear Information System (INIS)

    Walker, R.A.P.; Wang, B-C.; Fung, J.

    1996-01-01

    Technological obsolescence is an on-going challenge for all computer use. By design, and to some extent good fortune, AECL has had a good track record with respect to the march of obsolescence in CANDU digital control computer technology. Recognizing obsolescence as a fact of life, AECL has undertaken a program of supporting the digital control technology of existing CANDU plants. Other AECL groups are developing complete replacement systems for the digital control computers, and more advanced systems for the digital control computers of the future CANDU reactors. This paper presents the results of the efforts of AECL's DCC service support group to replace obsolete digital control computer and related components and to provide friendlier software technology related to the maintenance and use of digital control computers in CANDU. These efforts are expected to extend the current lifespan of existing digital control computers through their mandated life. This group applied two simple rules; the product, whether new or replacement should have a generic basis, and the products should be applicable to both existing CANDU plants and to 'repeat' plant designs built using current design guidelines. While some exceptions do apply, the rules have been met. The generic requirement dictates that the product should not be dependent on any brand technology, and should back-fit to and interface with any such technology which remains in the control design. The application requirement dictates that the product should have universal use and be user friendly to the greatest extent possible. Furthermore, both requirements were designed to anticipate user involvement, modifications and alternate user defined applications. The replacements for hardware components such as paper tape reader/punch, moving arm disk, contact scanner and Ramtek are discussed. The development of these hardware replacements coincide with the development of a gateway system for selected CANDU digital control

  18. Two-fold sustainability – Adobe with sawdust as partial sand replacement

    Science.gov (United States)

    Jokhio, Gul A.; Syed Mohsin, Sharifah M.; Gul, Yasmeen

    2018-04-01

    Adobe is a material that is economic, environment friendly, and provides better indoor air quality. The material required for the preparation of adobe include clay, sand, and sometimes straw or other organic materials. These materials do not require industrial processing or transportation, however, sand mining has been recently posing a threat to the environment. Therefore, to enhance the existing sustainability of adobe, sand can be partially or fully replaced by other waste materials. This approach will not only solve the problem of excessive sand mining, it will also address the issue of waste management. Sawdust is one such waste material that can be used to partially replace sand in Adobe. This paper presents the results of compressive and flexural test carried out on Adobe samples with partial sand replacement by sawdust. The results show that about 4% sand replacement by volume produces higher compressive strength, whereas the flexural strength reduces with the use of sawdust. However, since flexural strength is not a critical property for adobe, it is concluded that replacing sand with sawdust by about 4% of volume will be beneficial.

  19. BC Hydro's integrated approach on replacing underground feeder cables

    Energy Technology Data Exchange (ETDEWEB)

    Tarampi, D. [BC Hydro, Burnaby, BC (Canada)

    2008-07-01

    BC Hydro's integrated approach on replacing underground feeder cables was discussed. The feeder cables were all in ducts encased in concrete and splices were identified in concrete manholes. The feeder cables averaged 35 to 40 failures per year, with a large majority of failures occurring in manholes or near terminations. The age of the cables was not known. A graphical representation of a condition assessment was presented with reference to an electrical test, metallurgical test, hardness test, and dye penetrating test. Prioritization steps were also listed, including a condition index and replacement threshold. Steps in prioritizing the condition index included determining the insulation index based on electrical test results; determining the manhole condition based on metallurgical test results; determining the customer importance factor and feeder load factor; and calculating the overall condition index based on the indices. A process flowchart was also illustrated. A replacement strategy was then discussed and a cost comparison of two options was described. Option 1 was to replace only the unjacketed cables while option two involved selective replacement. tabs., figs.

  20. Remote telerobotic replacement for master-slave manipulator

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Iverson, D.C.; LaValle, D.R.

    1997-01-01

    A remotely replaceable telerobotic manipulator (TRM) has been developed and deployed at the Defense Waste Processing Facility (DWPF) in support of its radioactive operation. The TRM replaces a Master-Slave Manipulator (MSM). The TRM is in use for both routine and recovery operations for the radioactive waste vitrification melter, the primary production device within the DWPF. The arm was designed for deployment and operation using an existing MSM penetration. This replacement of an existing MSM with a high power robotic device demonstrates the capability to perform similar replacement in other operating facilities. The MSM's were originally deployed in the DWPF to perform routine light capacity tasks. During the testing phase of the DWPF, prior to its radioactive startup in 5/96, the need to remove glass deposits that can form at the melter discharge during filling of glass containment canisters was identified. The combination of high radiation and contamination in the DWPF melter cell during radioactive operation eliminated personnel entry as a recovery option. Therefore remote cleaning methods had to be devised. The MSM's had neither the reach nor the strength required for this task. It became apparent that a robust manipulator arm would be required for recovery from these potential melter discharge pluggage events. The existing wall penetrations, used for the MSM's, could not be altered for seismic and radiological reasons. The new manipulator was required to be of considerable reach, due to existing physical layout, and strength, due to the glass removal requirement. Additionally, the device would have to compatible with high radiation and remote crane installation. The physical size of the manipulator and the weight of components must be consistent with the existing facilities. It was recognized early-on that a manipulator of sufficient strength to recover from a pluggage event would require robotic functions to constrain undesirable motions

  1. Applications of molecular replacement to G protein-coupled receptors

    International Nuclear Information System (INIS)

    Kruse, Andrew C.; Manglik, Aashish; Kobilka, Brian K.; Weis, William I.

    2013-01-01

    The use of molecular replacement in solving the structures of G protein-coupled receptors is discussed, with specific examples being described in detail. G protein-coupled receptors (GPCRs) are a large class of integral membrane proteins involved in regulating virtually every aspect of human physiology. Despite their profound importance in human health and disease, structural information regarding GPCRs has been extremely limited until recently. With the advent of a variety of new biochemical and crystallographic techniques, the structural biology of GPCRs has advanced rapidly, offering key molecular insights into GPCR activation and signal transduction. To date, almost all GPCR structures have been solved using molecular-replacement techniques. Here, the unique aspects of molecular replacement as applied to individual GPCRs and to signaling complexes of these important proteins are discussed

  2. Neuronal replacement therapy: previous achievements and challenges ahead

    Science.gov (United States)

    Grade, Sofia; Götz, Magdalena

    2017-10-01

    Lifelong neurogenesis and incorporation of newborn neurons into mature neuronal circuits operates in specialized niches of the mammalian brain and serves as role model for neuronal replacement strategies. However, to which extent can the remaining brain parenchyma, which never incorporates new neurons during the adulthood, be as plastic and readily accommodate neurons in networks that suffered neuronal loss due to injury or neurological disease? Which microenvironment is permissive for neuronal replacement and synaptic integration and which cells perform best? Can lost function be restored and how adequate is the participation in the pre-existing circuitry? Could aberrant connections cause malfunction especially in networks dominated by excitatory neurons, such as the cerebral cortex? These questions show how important connectivity and circuitry aspects are for regenerative medicine, which is the focus of this review. We will discuss the impressive advances in neuronal replacement strategies and success from exogenous as well as endogenous cell sources. Both have seen key novel technologies, like the groundbreaking discovery of induced pluripotent stem cells and direct neuronal reprogramming, offering alternatives to the transplantation of fetal neurons, and both herald great expectations. For these to become reality, neuronal circuitry analysis is key now. As our understanding of neuronal circuits increases, neuronal replacement therapy should fulfill those prerequisites in network structure and function, in brain-wide input and output. Now is the time to incorporate neural circuitry research into regenerative medicine if we ever want to truly repair brain injury.

  3. Heart valve replacements with regenerative capacity

    NARCIS (Netherlands)

    Dijkman, P.E.; Fioretta, E.S.; Frese, L.; Pasqualini, F.S.; Hoerstrup, S.P.

    2016-01-01

    The incidence of severe valvular dysfunctions (e.g., stenosis and insufficiency) is increasing, leading to over 300,000 valves implanted worldwide yearly. Clinically used heart valve replacements lack the capacity to grow, inherently requiring repetitive and high-risk surgical interventions during

  4. Surface forcing of non-stand-replacing fires in Siberian larch forests

    Science.gov (United States)

    Chen, Dong; Loboda, Tatiana V.

    2018-04-01

    Wildfires are the dominant disturbance agent in the Siberian larch forests. Extensive low- to mediate-intensity non-stand-replacing fires are a notable property of fire regime in these forests. Recent large scale studies of these fires have focused mostly on their impacts on carbon budget; however, their potential impacts on energy budget through post-fire albedo changes have not been considered. This study quantifies the post-fire surface forcing for Siberian larch forests that experienced non-stand-replacing fires between 2001 and 2012 using the full record of MODIS MCD43A3 albedo product and a burned area product developed specifically for the Russian forests. Despite a large variability, the mean effect of non-stand-replacing fires imposed through albedo is a negative forcing which lasts for at least 14 years. However, the magnitude of the forcing is much smaller than that imposed by stand-replacing fires, highlighting the importance of differentiating between the two fire types in the studies involving the fire impacts in the region. The results of this study also show that MODIS-based summer differenced normalized burn ratio (dNBR) provides a reliable metric for differentiating non-stand-replacing from stand-replacing fires with an overall accuracy of 88%, which is of considerable importance for future work on modeling post-fire energy budget and carbon budget in the region.

  5. Suborbital Platforms as a Tool for a Symbiotic Relationship Between Scientists, Engineers, and Students

    Science.gov (United States)

    Chamberlin, Phillip C.

    2011-01-01

    Sounding rockets started in-situ space experimentation over 60 years ago with scientific experiments replacing warheads on captured V- 2 German rockets. Prior to this, and still today, suborbital platforms such as airplanes and high-altitude balloons have provided advantageous remote sensing observations advancing many areas of Earth and Space science. There is still a place for first-rate science in both stand-alone missions as well as providing complimentary measurements to the larger orbital missions. Along with the aforementioned science, the cost effectiveness and development times provided by sub-orbital platforms allows for perfect hands-on and first rate educational opportunities for undergraduate and graduate students. This talk will give examples and discuss the mutually beneficial opportunities that scientists and students obtain in development of suborbital missions. Also discussed will be how the next generation of space vehicles should help eliminate the number one obstacle to these programs - launch opportunities.

  6. Alpha male replacements in nonhuman primates: Variability in processes, outcomes, and terminology.

    Science.gov (United States)

    Teichroeb, Julie A; Jack, Katharine M

    2017-07-01

    Alpha male replacements occur in all primates displaying a dominance hierarchy but the process can be extremely variable. Here, we review the primate literature to document differences in patterns of alpha male replacements, showing that group composition and dispersal patterns account for a large proportion of this variability. We also examine the consequences of alpha male replacements in terms of sexual selection theory, infanticide, and group compositions. Though alpha male replacements are often called takeovers in the literature, this term masks much of the variation that is present in these processes. We argue for more concise terminology and provide a list of terms that we suggest more accurately define these events. Finally, we introduce the papers in this special issue on alpha male replacements in the American Journal of Primatology and discuss areas where data are still lacking. © 2017 Wiley Periodicals, Inc.

  7. Apixaban or enoxaparin for thromboprophylaxis after knee replacement

    DEFF Research Database (Denmark)

    Lassen, Michael Rud; Raskob, Gary E; Gallus, Alexander

    2009-01-01

    thromboprophylaxis with a low risk of bleeding and improved ease of use. METHODS: In a double-blind, double-dummy study, we randomly assigned patients undergoing total knee replacement to receive 2.5 mg of apixaban orally twice daily or 30 mg of enoxaparin subcutaneously every 12 hours. Both medications were started...... (P=0.03). CONCLUSIONS: As compared with enoxaparin for efficacy of thromboprophylaxis after knee replacement, apixaban did not meet the prespecified statistical criteria for noninferiority, but its use was associated with lower rates of clinically relevant bleeding and it had a similar adverse...

  8. Fabrication and replacement work of beryllium frame and gamma-ray shield

    International Nuclear Information System (INIS)

    Watahiki, Shunsuke; Hanawa, Yoshio; Asano, Norikazu; Hiyama, Kazuhisa; Ito, Sachito; Tsuboi, Kazuaki; Fukasaku, Akitomi

    2012-03-01

    This replacement work was carried out under refurbishment plan of JMTR for beryllium distortion draw to acceptable limit. And gamma-ray shield refurbishment was carried out the view point of prevention maintenance in consideration of operation plan. Fabrication of beryllium frame and gamma-ray shield was spent for two years it was finished in February, 2010. It took five months to replacement work from January 2010. In this report is presented fabrication and replacement work of beryllium frame and gamma-ray shield. (author)

  9. Initiating Heavy-atom Based Phasing by Multi-Dimensional Molecular Replacement

    DEFF Research Database (Denmark)

    Pedersen, Bjørn Panyella; Gourdon, Pontus; Liu, Xiangyu

    2014-01-01

    -based approaches, which however may fail when only poorly diffracting derivative crystals are available, as often the case for e.g. membrane proteins. Here we present an approach for heavy atom site identification based on a Molecular Replacement Parameter Matrix (MRPM) search. It involves an n-dimensional search...... to test a wide spectrum of molecular replacement parameters, such as clusters of different conformations. The result is scored by the ability to identify heavy-atom positions, from anomalous difference Fourier maps, that allow meaningful phases to be determined. The strategy was successfully applied...... but correct molecular replacement solutions with maximum contrast to prime experimental phasing efforts....

  10. Politicization and the Replacement of Top Civil Servants in Denmark

    DEFF Research Database (Denmark)

    Christensen, Jørgen Grønnegård; Opstrup, Niels; Klemmensen, Robert

    2014-01-01

    This article of top civil servants in Danish central and local government sheds new light on politicization. A survival analysis shows that since 1970, the risk that a top civil servant will be replaced has increased. There is no evidence of politicization in central government while city managers......’ risk of replacement increases both when a new mayor, representing another party and holding an absolute majority, and when the shift of mayor takes place within the same party. We interpret these results as evidence of the adaptability of the merit civil service and political executives’ stronger...... insistence on their authority to make discretionary replacements....

  11. The cyclops lesion after bicruciate-retaining total knee replacement

    OpenAIRE

    Klaassen, Mark A.; Aikins, Jerry L.

    2017-01-01

    The cyclops lesion is a localized anterior arthrofibrosis most commonly seen following anterior cruciate ligament reconstruction. The lesion forms at the anterior cruciate ligament insertion creating a painful extension block between femoral intercondylar notch and tibial plateau. We present 2 cases (3 knees) in which cyclops lesions appeared atypically following bicruciate-retaining total knee replacement. Two lesions occurred in a single patient following bilateral knee replacement. One les...

  12. Credit constraints, consumer leasing and the automobile replacement decision

    OpenAIRE

    Kathleen W. Johnson

    1999-01-01

    This paper presents a model of consumer automobile replacement in the presence of leasing. The model incorporates credit constraints to distinguish between the leasing and purchasing options. It demonstrates how leasing increases the probability that a household replaces its automobile and how households that lease choose higher quality automobiles. The qualitative choice model of the household's decision to lease provides support for the observation that households that lease face credit con...

  13. Glaucoma after corneal replacement.

    Science.gov (United States)

    Baltaziak, Monika; Chew, Hall F; Podbielski, Dominik W; Ahmed, Iqbal Ike K

    Glaucoma is a well-known complication after corneal transplantation surgery. Traditional corneal transplantation surgery, specifically penetrating keratoplasty, has been slowly replaced by the advent of new corneal transplantation procedures: primarily lamellar keratoplasties. There has also been an emergence of keratoprosthesis implants for eyes that are high risk of failure with penetrating keratoplasty. Consequently, there are different rates of glaucoma, pathogenesis, and potential treatment in the form of medical, laser, or surgical therapy. Copyright © 2017 Elsevier Inc. All rights reserved.

  14. Who Will Replace Those Vanishing Execs?

    Science.gov (United States)

    Geber, Beverly

    2000-01-01

    Many top-level managers are retiring early. Programs to prepare their replacements have been scaled back. Many companies are offering phased retirement plans, redesigning jobs, and paying for spouses to go along on business trips to keep their managers a little longer. (JOW)

  15. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Etalle, Sandro; Palamidessi, Catuscia

    1999-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  16. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Bossi, Annalisa; Etalle, Sandro; Palamidessi, Catuscia

    2000-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  17. Prosthesis infections after orthopedic joint replacement

    DEFF Research Database (Denmark)

    Song, Zhijun; Borgwardt, Lotte; Høiby, Niels

    2013-01-01

    Prosthesis-related infection is a serious complication for patients after orthopedic joint replacement, which is currently difficult to treat with antibiotic therapy. Consequently, in most cases, removal of the infected prosthesis is the only solution to cure the infection. It is, therefore...

  18. Joint Replacement (Finger and Wrist Joints)

    Science.gov (United States)

    ... All Topics A-Z Videos Infographics Symptom Picker Anatomy Bones Joints Muscles Nerves Vessels Tendons About Hand Surgery What is a Hand Surgeon? What is a Hand Therapist? Media Find a Hand Surgeon Home Anatomy Joint Replacement Email to a friend * required fields ...

  19. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  20. [Reoperative valve replacement in patients undergoing cardiac reoperation: a report of 104 cases].

    Science.gov (United States)

    Zou, Liang-jian; Xu, Zhi-yun; Wang, Zhi-nong; Lang, Xi-long; Han, Lin; Lu, Fang-lin; Xu, Ji-bin; Tang, Hao; Ji, Guang-yu; Wang, Er-song; Wang, Jun; Qu, Yi

    2010-08-15

    To review the experience of reoperative valve replacement for 104 patients. From January 2002 to December 2009, 104 patients underwent heart valve replacement in reoperations, accounting for 2.92% of the total patient population (3557 cases) who had valve replacement during this period. In this group, 53 male and 51 female patients were included with a median age of 46 years (ranged from 13 to 72 years). The reasons of reoperation included 28 cases suffered from another valve lesion after valve replacement, 10 cases suffered from valve lesion after mitral valvuloplasty, 19 cases suffered from perivalvular leakage after valve replacement, 18 cases suffered from valve lesion after previous correction of congenital heart defect, 7 cases suffered from bioprosthetic valve decline, 10 cases suffered from prosthetic valve endocarditis, 9 cases suffered from dysfunction of machine valve, and 3 cases suffered from other causes. The re-operations were mitral and aortic valve replacement in 2 cases, mitral valve replacement in 59 cases, aortic valve replacement in 24 cases, tricuspid valve replacement in 16 cases, and Bentall's operation in 3 cases. The interval from first operation to next operation was 1 month-19 years. There were 8 early deaths from heart failure, renal failure and multiple organ failure (early mortality 7.69%). Major complications were intraoperative hemorrhage in 2 cases, re-exploration for mediastinal bleeding in 2 cases and sternotomy surgical site infection in 1 case. Complete follow-up (3 months-7 years and 2 months) was available for all patients. Two patients died, one patient died of intracranial hemorrhage, and another cause was unknown. Satisfactory short-term and long-term results can be obtained in reoperative valve replacement with appropriate timing of operation control, satisfactory myocardial protection, accurate surgical procedure and suitable perioperative treatment.

  1. Testosterone replacement in male hypogonadism

    OpenAIRE

    Kalra, Sanjay; Agrawal, Navneet; Kumar, Satish; Sharma, Amit

    2010-01-01

    Sanjay Kalra1, Navneet Agrawal2, Satish Kumar3, Amit Sharma11Department of Endocrinology, Bharti Hospital, Karnal, India; 2Dept of Medicine, GR Medical College, Gwalior, India; 3Clinical Research, EXCEL Life Sciences, NOIDA, IndiaAbstract: This article contains a review of the clinical aspects of testosterone replacement in androgen deficiency of the aging male.Keywords: testosterone, supplementation, hypogonadism, ADAM

  2. A review on seashells ash as partial cement replacement

    Science.gov (United States)

    Mohammad, Wan Ahmad Soffian Bin Wan; Hazurina Othman, Nor; Ibrahim, Mohd Haziman Wan; Rahim, Masazurah A.; Shahidan, Shahiron; Rahman, Raha Abd

    2017-11-01

    This review paper emphasis on various sea shells ash such as cockle, clam, oyster, mollusc, periwinkle, snail, and green mussel shell ash as partial cement replacement and its objective is to create sustainable environment and reduce problems of global warming. Cement production give huge impact to environment in every stage of its production. These include air pollution in form of dust and, gases, sound and vibration during quarry crushing and milling. One of the solutions to solve this problem is by using modified cement. The modified cement is a cementitious material that meets or exceeds the Portland cement performance by combining and optimizes the recycle and wasted materials. This will indirectly reduce the use of raw materials and then, become a sustain construction materials. Therefore, the replacement of cement in concrete by various sea shell ash may create tremendous saving of energy and also leads to important environmental benefits. This study includes previous investigation done on the properties of chemical and mechanical such as specific gravity, chemical composition, compressive strength, tensile strength and flexural strength of concrete produced using partial replacement of cement by seashells ash. Results show that the optimum percentage of seashells as cement replacement is between 4 - 5%.

  3. Transdermal testosterone replacement therapy in men

    Directory of Open Access Journals (Sweden)

    Ullah MI

    2014-01-01

    Full Text Available M Iftekhar Ullah,1 Daniel M Riche,1,2 Christian A Koch1,31Department of Medicine, University of Mississippi Medical Center, 2Department of Pharmacy Practice, The University of Mississippi, 3GV (Sonny Montgomery VA Medical Center, Jackson, MS, USAAbstract: Androgen deficiency syndrome in men is a frequently diagnosed condition associated with clinical symptoms including fatigue, decreased libido, erectile dysfunction, and metabolic syndrome. Serum testosterone concentrations decline steadily with age. The prevalence of androgen deficiency syndrome in men varies depending on the age group, known and unknown comorbidities, and the respective study group. Reported prevalence rates may be underestimated, as not every man with symptoms of androgen deficiency seeks treatment. Additionally, men reporting symptoms of androgen deficiency may not be correctly diagnosed due to the vagueness of the symptom quality. The treatment of androgen deficiency syndrome or male hypogonadism may sometimes be difficult due to various reasons. There is no consensus as to when to start treating a respective man or with regards to the best treatment option for an individual patient. There is also lack of familiarity with treatment options among general practitioners. The formulations currently available on the market are generally expensive and dose adjustment protocols for each differ. All these factors add to the complexity of testosterone replacement therapy. In this article we will discuss the general indications of transdermal testosterone replacement therapy, available formulations, dosage, application sites, and recommended titration schedule.Keywords: hypogonadism, transdermal, testosterone, sexual function, testosterone replacement therapy, estradiol

  4. Failure rate of cemented and uncemented total hip replacements

    DEFF Research Database (Denmark)

    Makela, K. T.; Matilainen, M.; Pulkkinen, P.

    2014-01-01

    ). Participants 347 899 total hip replacements performed during 1995-2011. Main outcome measures Probability of implant survival (Kaplan-Meier analysis) along with implant survival with revision for any reason as endpoint (Cox multiple regression) adjusted for age, sex, and diagnosis in age groups 55-64, 65......Objective To assess the failure rate of cemented, uncemented, hybrid, and reverse hybrid total hip replacements in patients aged 55 years or older. Design Register study. Setting Nordic Arthroplasty Register Association database (combined data from Sweden, Norway, Denmark, and Finland......-74, and 75 years or older. Results The proportion of total hip replacements using uncemented implants increased rapidly towards the end of the study period. The 10 year survival of cemented implants in patients aged 65 to 74 and 75 or older (93.8%, 95% confidence interval 93.6% to 94.0% and 95.9%, 95...

  5. Spontaneous Coronary Artery Dissection following Topical Hormone Replacement Therapy

    Directory of Open Access Journals (Sweden)

    Alexander L. Pan

    2012-01-01

    Full Text Available Spontaneous coronary artery dissection is a rare condition, usually presenting as an acute coronary syndrome, and is often seen in states associated with high systemic estrogen levels such as pregnancy or oral contraceptive use. While topical hormonal replacement therapy may result in increased estrogen levels similar to those documented with oral contraceptive use, there are no reported cases of spontaneous coronary dissection with topical hormonal replacement therapy. We describe a 53-year-old female who developed two spontaneous coronary dissections while on topical hormonal replacement therapy. The patient had no other risk factors for coronary dissection. After withdrawal from topical hormonal therapy, our patient has done well and has not had recurrent coronary artery dissections over a one-year follow-up period. The potential contributory role of topical hormonal therapy as a cause of spontaneous coronary dissection should be recognized.

  6. Respondent-Driven Sampling – Testing Assumptions: Sampling with Replacement

    Directory of Open Access Journals (Sweden)

    Barash Vladimir D.

    2016-03-01

    Full Text Available Classical Respondent-Driven Sampling (RDS estimators are based on a Markov Process model in which sampling occurs with replacement. Given that respondents generally cannot be interviewed more than once, this assumption is counterfactual. We join recent work by Gile and Handcock in exploring the implications of the sampling-with-replacement assumption for bias of RDS estimators. We differ from previous studies in examining a wider range of sampling fractions and in using not only simulations but also formal proofs. One key finding is that RDS estimates are surprisingly stable even in the presence of substantial sampling fractions. Our analyses show that the sampling-with-replacement assumption is a minor contributor to bias for sampling fractions under 40%, and bias is negligible for the 20% or smaller sampling fractions typical of field applications of RDS.

  7. Replacement policy in a system under shocks following a Markovian arrival process

    International Nuclear Information System (INIS)

    Montoro-Cazorla, Delia; Perez-Ocon, Rafael; Carmen Segovia, Maria del

    2009-01-01

    We present a system subject to shocks that arrive following a Markovian arrival process. The system is minimally repaired. It is replaced when a certain number of shocks arrive. A general model where the replacements are governed by a discrete phase-type distribution is studied. For this system, the Markov process governing the system is constructed, and the interarrival times between replacements and the number of replacements are calculated. A special case of this system is when it can stand a prefixed number of shocks. For this new system, the same performance measures are calculated. The systems are considered in transient and stationary regime

  8. Replacement policy in a system under shocks following a Markovian arrival process

    Energy Technology Data Exchange (ETDEWEB)

    Montoro-Cazorla, Delia [Department of Statistics and Operational Research, University of Jaen (Spain); Perez-Ocon, Rafael [Department of Statistics and Operational Research, University of Granada, Granada (Spain)], E-mail: rperezo@ugr.es; Carmen Segovia, Maria del [Departamento de Estadistica e I.O., University of Granada, Granada (Spain)

    2009-02-15

    We present a system subject to shocks that arrive following a Markovian arrival process. The system is minimally repaired. It is replaced when a certain number of shocks arrive. A general model where the replacements are governed by a discrete phase-type distribution is studied. For this system, the Markov process governing the system is constructed, and the interarrival times between replacements and the number of replacements are calculated. A special case of this system is when it can stand a prefixed number of shocks. For this new system, the same performance measures are calculated. The systems are considered in transient and stationary regime.

  9. Model for Quantitative Evaluation of Enzyme Replacement Treatment

    Directory of Open Access Journals (Sweden)

    Radeva B.

    2009-12-01

    Full Text Available Gaucher disease is the most frequent lysosomal disorder. Its enzyme replacement treatment was the new progress of modern biotechnology, successfully used in the last years. The evaluation of optimal dose of each patient is important due to health and economical reasons. The enzyme replacement is the most expensive treatment. It must be held continuously and without interruption. Since 2001, the enzyme replacement therapy with Cerezyme*Genzyme was formally introduced in Bulgaria, but after some time it was interrupted for 1-2 months. The dose of the patients was not optimal. The aim of our work is to find a mathematical model for quantitative evaluation of ERT of Gaucher disease. The model applies a kind of software called "Statistika 6" via the input of the individual data of 5-year-old children having the Gaucher disease treated with Cerezyme. The output results of the model gave possibilities for quantitative evaluation of the individual trends in the development of the disease of each child and its correlation. On the basis of this results, we might recommend suitable changes in ERT.

  10. Language continuity despite population replacement in Remote Oceania.

    Science.gov (United States)

    Posth, Cosimo; Nägele, Kathrin; Colleran, Heidi; Valentin, Frédérique; Bedford, Stuart; Kami, Kaitip W; Shing, Richard; Buckley, Hallie; Kinaston, Rebecca; Walworth, Mary; Clark, Geoffrey R; Reepmeyer, Christian; Flexner, James; Maric, Tamara; Moser, Johannes; Gresky, Julia; Kiko, Lawrence; Robson, Kathryn J; Auckland, Kathryn; Oppenheimer, Stephen J; Hill, Adrian V S; Mentzer, Alexander J; Zech, Jana; Petchey, Fiona; Roberts, Patrick; Jeong, Choongwon; Gray, Russell D; Krause, Johannes; Powell, Adam

    2018-04-01

    Recent genomic analyses show that the earliest peoples reaching Remote Oceania-associated with Austronesian-speaking Lapita culture-were almost completely East Asian, without detectable Papuan ancestry. However, Papuan-related genetic ancestry is found across present-day Pacific populations, indicating that peoples from Near Oceania have played a significant, but largely unknown, ancestral role. Here, new genome-wide data from 19 ancient South Pacific individuals provide direct evidence of a so-far undescribed Papuan expansion into Remote Oceania starting ~2,500 yr BP, far earlier than previously estimated and supporting a model from historical linguistics. New genome-wide data from 27 contemporary ni-Vanuatu demonstrate a subsequent and almost complete replacement of Lapita-Austronesian by Near Oceanian ancestry. Despite this massive demographic change, incoming Papuan languages did not replace Austronesian languages. Population replacement with language continuity is extremely rare-if not unprecedented-in human history. Our analyses show that rather than one large-scale event, the process was incremental and complex, with repeated migrations and sex-biased admixture with peoples from the Bismarck Archipelago.

  11. Software for handling and replacement of missing data

    Directory of Open Access Journals (Sweden)

    Mayer, Benjamin

    2009-10-01

    Full Text Available In medical research missing values often arise in the course of a data analysis. This fact constitutes a problem for different reasons, so e.g. standard methods for analyzing data lead to biased estimates and a loss of statistical power due to missing values, since those methods require complete data sets and therefore omit incomplete cases for the analyses. Furthermore missing values imply a certain loss of information for what reason the validity of results of a study with missing values has to be rated less than in a case where all data had been available. For years there are methods for replacement of missing values (Rubin, Schafer to tackle these problems and solve them in parts. Hence in this article we want to present the existing software to handle and replace missing values on the one hand and give an outline about the available options to get information on the other hand. The methodological aspects of the replacement strategies are delineated just briefly in this article.

  12. Supercapacitor performance evaluation in replacing battery based on charging and discharging current characteristics

    Science.gov (United States)

    Sani, A.; Siahaan, S.; Mubarakah, N.; Suherman

    2018-02-01

    Supercapacitor is a new device of energy storage, which has much difference between ordinary capacitors and batteries. Supercapacitor have higher capacitance and energy density than regular capacitors. The supercapacitor also has a fast charging time, as well as a long life. To be used as a battery replacement please note the internal parameters of the battery to be replaced. In this paper conducted a simulation study to utilize supercapacitor as a replacement battery. The internal parameters of the battery and the supercapacitor are obtained based on the characteristics of charging and discharging current using a predefined equivalent circuit model. The battery to be replaced is a 12-volt lead-acid type, 6.5 Ah which is used on motorcycles with 6A charging and discharging currents. Super capacitor replacement capacitor is a capacity of 1600F, 2.7V which is connected in series as many as 6 pieces with 16.2 volt terminal voltage and charging current 12A. To obtain the same supercapacitor characteristic as the battery characteristic to be replaced, modification of its internal parameters is made. The results show that the super-capacitor can replace the battery function for 1000 seconds.

  13. Growth Performances of Female and Male Holstein Calves Fed Milk and Milk Replacers

    Directory of Open Access Journals (Sweden)

    Tahir BAYRIL

    2015-01-01

    Full Text Available The objective of this study was to compare growth performances of male and female Holstein calves fed milk and milk replacers. A total of 60 Holstein calves were used in the study. Calves were divided into three equal groups. In each group, there were 10 female and 10 male calves. Calves were offered colostrum for 3 days after birth and were weighed at fourth day for the trial. Initial body weights of calves in dietary treatments were statistically similar. The first, second and third groups were fed milk, milk replacer-I (CP 21% and CF 16.5% and milk replacer-II (CP 24% and CF 18%, respectively. In addition to milk and milk replacers, calves were supplemented with ad libitum concentrate feed and alfalfa. Dietary treatment was significantly effective (P<0.05 on body weight of calves at 60 days of age. In conclusion, growth performances of calves increased with increasing protein content of milk replacer had better than those of calves fed milk replacer containing low-protein. Therefore, during the suckling period, in feeding of Holstein calves, milk or milk replacer containing high-protein should be preferred primarily.

  14. Probability Issues in without Replacement Sampling

    Science.gov (United States)

    Joarder, A. H.; Al-Sabah, W. S.

    2007-01-01

    Sampling without replacement is an important aspect in teaching conditional probabilities in elementary statistics courses. Different methods proposed in different texts for calculating probabilities of events in this context are reviewed and their relative merits and limitations in applications are pinpointed. An alternative representation of…

  15. vein thrombosis in elective hip replacement

    African Journals Online (AJOL)

    A consensus forum was convened to evaluate the economic considerations associated with prophylaxis against thrombo-embolic disease in patients undergoing hip replacement therapy in South Africa. This forum consists of orthopaedic surgeons, vascular surgeons and a statistician. Methods. The forum was instructed to ...

  16. Aggression Replacement Training and Childhood Trauma

    Science.gov (United States)

    Amendola, A. Mark; Oliver, Robert W.

    2013-01-01

    Aggression Replacement Training (ART) was developed by the late Arnold Goldstein of Syracuse University to teach positive alternatives to children and youth with emotional and behavioral problems (Glick & Gibbs, 2011; Goldstein, Glick, & Gibbs, 1998). ART provides cognitive, affective, and behavioral interventions to build competence in…

  17. Continuous vasopressin replacement in diabetes insipidus.

    OpenAIRE

    Ralston, C; Butt, W

    1990-01-01

    Five children who developed diabetes insipidus as a manifestation of severe brain injury received continuous intravenous treatment with a solution containing both aqueous vasopressin and appropriate crystalloid replacement. Polyuria, hypernatraemia, and decreased urine osmolalities were safely corrected in all patients within eight to 28 hours.

  18. Evaluation of genomic selection for replacement strategies using selection index theory.

    Science.gov (United States)

    Calus, M P L; Bijma, P; Veerkamp, R F

    2015-09-01

    Our objective was to investigate the economic effect of prioritizing heifers for replacement at the herd level based on genomic estimated breeding values, and to compute break-even genotyping costs across a wide range of scenarios. Specifically, we aimed to determine the optimal proportion of preselection based on parent average information for all scenarios considered. Considered replacement strategies include a range of different selection intensities by considering different numbers of heifers available for replacement (15-45 in a herd with 100 dairy cows) as well as different replacement rates (15-40%). Use of conventional versus sexed semen was considered, where the latter resulted in having twice as many heifers available for replacement. The baseline scenario relies on prioritization of replacement heifers based on parent average. The first alternative scenario involved genomic selection of heifers, considering that all heifers were genotyped. The benefits of genomic selection in this scenario were computed using a simple formula that only requires the number of lactating animals, the difference in accuracy between parent average and genomic selection (GS), and the selection intensity as input. When all heifers were genotyped, using GS for replacement of heifers was beneficial in most scenarios for current genotyping prices, provided some room exists for selection, in the sense that at least 2 more heifers are available than needed for replacement. In those scenarios, minimum break-even genotyping costs were equal to half the economic value of a standard deviation of the breeding goal. The second alternative scenario involved a preselection based on parent average, followed by GS among all the preselected heifers. It was in almost all cases beneficial to genotype all heifers when conventional semen was used (i.e., to do no preselection). The optimal proportion of preselection based on parent average was at least 0.63 when sexed semen was used. Use of sexed

  19. A cost-effectiveness analysis of hormone replacement therapy in the menopause.

    Science.gov (United States)

    Cheung, A P; Wren, B G

    1992-03-02

    To evaluate the cost-effectiveness of hormone replacement therapy in the menopause with particular reference to osteoporotic fracture and myocardial infarction. The multiple-decrement form of the life table was the mathematical model used to follow women of age 50 through their lifetime under the "no hormone replacement" and "hormone replacement" assumptions. Standard demographic and health economic techniques were used to calculate the corresponding lifetime differences in direct health care costs (net costs in dollars) and health effects ("net effectiveness" in terms of life expectancy and quality, in "quality-adjusted life-years"). This was then expressed as a cost-effectiveness ratio or the cost ($) per quality-adjusted life-year (QALY) for each of the chosen hormone replacement regimens. All women of age 50 in New South Wales, Australia (n = 27,021). The analysis showed that the lifetime net increments in direct medical care costs were largely contributed by hormone drug and consultation costs. Hormone replacement was associated with increased quality-adjusted life expectancy, a large percentage of which was attributed to a relief of menopausal symptoms. Cost-effectiveness ratios ranged from under 10,000 to over a million dollars per QALY. Factors associated with improved cost-effectiveness were prolonged treatment duration, the presence of menopausal symptoms, minimum progestogen side effects (in the case of oestrogen with progestogen regimens), oestrogen use after hysterectomy and the inclusion of cardiac benefits in addition to fracture prevention. Hormone replacement therapy for symptomatic women is cost-effective when factors that enhance its efficiency are considered. Short-term treatment of asymptomatic women for prevention of osteoporotic fractures and myocardial infarction is an inefficient use of health resources. Cost-effectiveness of hormone replacement in asymptomatic women is dependent on the magnitude of cardiac benefits associated with hormone

  20. Replacement Value of Palm Kernel Meal for Maize on Carcass ...

    African Journals Online (AJOL)

    This study was conducted to evaluate the effect of replacing maize with palm kernel meal on nutrient composition, fatty acid profile and sensory qualities of the meat of turkeys fed the dietary treatments. Six dietary treatments were formulated using palm kernel meal to replace maize at 0, 20, 40, 60, 80 and 100 percent.

  1. Replacement of the glove box panel in nuclear fuel reprocessing facility

    International Nuclear Information System (INIS)

    Yamamoto, Masahiko; Shirouzu, Hidetomo; Mori, Eito; Surugaya, Naoki

    2016-05-01

    The panels for visual confirmation of glove box installed at Operation Testing Laboratory in Tokai Reprocessing Plant have been deteriorated and transparencies have been decreased due to the long-term use. Therefore, the glove box panels have been replaced from the view point of preventive maintenance. In the new regulation formulated since the accident at Tokyo Electric Power Company's Fukushima Daiichi Nuclear Power Station, it is demanded that the glove box consists of incombustible or noncombustible materials. In this replacement, the new panels have been manufactured with the polycarbonate which satisfied the UL94 V-0 incombustible class. The glove box has been in service for 40 years and its inside is contaminated with radioactive materials. Thus, the contaminations have been investigated and decontaminated before the replacement work. Then, operator's exposure and radiation protection equipment have been estimated. Also, it is necessary to replace the panels with maintaining the glove box's enclosure function. The replacement has been conducted in closed space covering the opening parts with vinyl sheets. The enclosure function has been verified by the inspection of the new panels and glove box. (author)

  2. Fatty replacement of lower paraspinal muscles: normal and neuromuscular disorders

    International Nuclear Information System (INIS)

    Hader, H.; Gadoth, N.; Heifetz, H.

    1983-01-01

    The physiologic replacement of the lower paraspinal muscles by fat was evaluated in 157 patients undergoing computed tomography for reasons unrelated to abnormalities of the locomotor system. Five patients with neuromuscular disorders were similarly evaluated. The changes were graded according to severity at three spinal levels: lower thoracic-upper lumbar, midlumbar, and lumbosacral. The results were analyzed in relation to age and gender. It was found that fatty replacement of paraspinal muscles is a normal age-progressive phenomenon most prominent in females. It progresses down the spine, being most advanced in the lumbosacral region. The severest changes in the five patients with neuromuscular disorders (three with poliomyelitis and two with progressive muscular dystrophy) consisted of complete muscle group replacement by fat. In postpoliomyelitis atrophy, the distribution was typically asymmetric and sometimes lacked clinical correlation. In muscular dystrophy, fatty replacement was symmetric, showing relative sparing of the psoas and multifidus muscles. In patients with neuromuscular diseases, computed tomography of muscles may be helpful in planning a better rehabilitation regimen

  3. Fatty replacement of lower paraspinal muscles: normal and neuromuscular disorders

    Energy Technology Data Exchange (ETDEWEB)

    Hader, H.; Gadoth, N.; Heifetz, H.

    1983-11-01

    The physiologic replacement of the lower paraspinal muscles by fat was evaluated in 157 patients undergoing computed tomography for reasons unrelated to abnormalities of the locomotor system. Five patients with neuromuscular disorders were similarly evaluated. The changes were graded according to severity at three spinal levels: lower thoracic-upper lumbar, midlumbar, and lumbosacral. The results were analyzed in relation to age and gender. It was found that fatty replacement of paraspinal muscles is a normal age-progressive phenomenon most prominent in females. It progresses down the spine, being most advanced in the lumbosacral region. The severest changes in the five patients with neuromuscular disorders (three with poliomyelitis and two with progressive muscular dystrophy) consisted of complete muscle group replacement by fat. In postpoliomyelitis atrophy, the distribution was typically asymmetric and sometimes lacked clinical correlation. In muscular dystrophy, fatty replacement was symmetric, showing relative sparing of the psoas and multifidus muscles. In patients with neuromuscular diseases, computed tomography of muscles may be helpful in planning a better rehabilitation regimen.

  4. Political Participation Online: The Replacement and the Mobilisation Hypotheses Revisited

    DEFF Research Database (Denmark)

    Jensen, Jakob Linaa

    2013-01-01

    This article discusses the state of political participation online more than ten years after the Internet’s great popular breakthrough as an everyday medium. Denmark is used as a case study to critically re-examine the frequently discussed replacement and mobilisation hypotheses on behalf of the ...... participation, efficacy and social capital seem to have less impact on online political participation. In the end, these findings are related to more overall discussions on the democratising potential of the Internet.......This article discusses the state of political participation online more than ten years after the Internet’s great popular breakthrough as an everyday medium. Denmark is used as a case study to critically re-examine the frequently discussed replacement and mobilisation hypotheses on behalf...... of the Internet. The pure replacement hypothesis is rejected. Instead, it is found that the Internet still supplements rather than replaces other media, even among heavy Internet users. The Internet is one among several media used by ‘media omnivores’, and political participation online supplements rather than...

  5. Investigation of gamma-ray fingerprint identifying mechanism for the types of radiation sources

    International Nuclear Information System (INIS)

    Liu Suping; Wu Huailong; Gu Dangchang; Gong Jian; Hao Fanhua; Hu Guangchun

    2002-01-01

    Radiation fingerprints sometimes can be used to label and identify the radiation resources. For instance, in a future nuclear reduction treaty that requires verification of irreversible dismantling of reduced nuclear warheads, the radiation fingerprints of nuclear warheads are expected to play a key role in labelling and identifying the reduced warheads. It would promote the development of nuclear warheads deep-cuts verification technologies if authors start right now some investigations on the issues related to the radiation fingerprints. The author dedicated to the investigation of gamma-ray fingerprint identifying mechanism for the types of radiation resources. The purpose of the identifying mechanism investigation is to find a credible way to tell whether any two gamma-ray spectral fingerprints that are under comparison are radiated from the same resource. The authors created the spectrum pattern comparison (SPC) to study the comparability of the two radiation fingerprints. Guided by the principle of SPC, the authors programmed a software dedicated to identify the types of radiation resources. The efficiency of the software was tested by a series of experiments with some laboratory gamma-ray resources. The experiments were designed to look into the relations between comparability and radioactive statistics, and the relations between comparability and some measurement conditions such as real time, resource activity and background etc. Two main results can be drawn from the investigation: 1) it is quite feasible to use the concept of spectral comparability to answer the question whether any two gamma-ray fingerprints are identity or not; 2) the identifying mechanism can only identify the types of radiation resources, and cannot identify the individuals with the same type and small differences

  6. The replacement of serum by hormones in cell culture media.

    Science.gov (United States)

    Sato, G; Hayashi, I

    1976-12-01

    The replacement of serum by hormones in cell culture media. (Reemplazo del suero por hormonas en el medio de cultivo de células). Arch. Biol. Med. Exper. 10: 120-121, 1976. The serum used in cell culture media can be replaced by a mixture of hormones and some accesory blood factors. The pituitary cell line GH3 can be grown in a medium in which serum is replaced by triiodothyronine, transferrin, parathormone, tyrotrophin releasing hormone and somatomedins. Hela and BHK cell strains can also be grown in serum free medium supplemented with hormones. Each cell type appears to have different hormonal requirements yet it may found that some hormones are required for most cell types.

  7. Saturation and isotopic replacement of deuterium in low-Z material

    International Nuclear Information System (INIS)

    Doyle, B.L.; Wampler, W.R.; Brice, D.K.; Picraux, S.T.

    1980-01-01

    The saturation and replacement of hydrogen isotopes implanted into TiC, TiB 2 , VB 2 , B 4 C, B, Si, and C has been examined experimentally and modeled theoretically. The deuterium saturation concentrations for these materials varied from .16 to .57. A new isotopic replacement model is presented which predicts isotopic trapping and exchange on the basis of the depth dependence of the implanted ions and the experimentally determined hydrogen saturation concentration. Our results indicate that, for these materials used as coatings on components in a D-T fueled tokamak, T recovery by ion induced replacement with H or D should be feasible and that T buildup will be at tolerable levels

  8. Bentall operation, total aortic replacement and mitral valve replacement for a young adult with Marfan syndrome: a case of three-staged operation.

    Science.gov (United States)

    Inui, K; Shimazaki, Y; Watanabe, T; Kuraoka, S; Minowa, T; Miura, M; Oshikiri, S; Toyama, H

    1998-08-01

    In Marfan syndrome, the most common cardiovascular abnormalities are dilatation of the aorta and aortic valve regurgitation in adult patients. Mitral valve dysfunction is the most common cause of morbidity and mortality in infants and children with Marfan syndrome, and is not frequently operated on in adult Marfan patients who undergo surgery for diseases of the aortic root and total aorta. This report describes a successfully three-staged operation for a 24 year-old man with Marfan syndrome who underwent an emergent Bentall operation and aortic arch replacement, total aortic replacement and mitral valve replacement over 2 years. Mitral valve regurgitation was mild but increased after the second operation. The graft was tightly adhesive and invasive to the sternum. Endoscopic view was helpful to avoid graft damage at resternotomy. The postoperative course was uneventful in each operation. Microscopic examination of the mitral valve leaflets showed abnormal increase of mucopolysaccharides, and disruption and fragmentation of elastic fibers.

  9. The Salary Premium Required for Replacing Management Faculty: Evidence from a National Survey

    Science.gov (United States)

    Finch, J. Howard; Allen, Richard S.; Weeks, H. Shelton

    2010-01-01

    One of the most important aspects of growing and improving business education is replacing departed faculty members. As the baby-boom generation approaches retirement, the supply of available replacement faculty members is diminishing. The result is a competitive market for replacement faculty that features increasing starting salary levels. In…

  10. New concepts in nuclear arms control: verified cutoff and verified disposal

    International Nuclear Information System (INIS)

    Donnelly, W.H.

    1990-01-01

    Limiting the numbers of nuclear warheads by reducing military production and stockpiles of fissionable materials has been a constant item on the nuclear arms control agenda for the last 45 years. It has become more salient recently, however, because of two events: the enforced closure for safety reasons of the current United States military plutonium production facilities; and the possibility that the US and USSR may soon conclude an agreement providing for the verified destruction of significant numbers of nuclear warheads and the recovery of the fissionable material they contain with the option of transferring these materials to peaceful uses. A study has been made of the practical problems of verifying the cut off of fissionable material production for military purposes in the nuclear weapon states, as well as providing assurance that material recovered from warheads is not re-used for proscribed military purposes and facilitating its transfer to civil uses. Implementation of such measures would have important implications for non-proliferation. The resultant paper was presented to a meeting of the PPNN Core Group held in Baden, close to Vienna, over the weekend of 18/19th November 1989 and is reprinted in this booklet. (author)

  11. Ethamsylate and blood loss in total hip replacement.

    Science.gov (United States)

    Keith, I

    1979-01-01

    Nineteen consecutive patients undergoing total hip replacement under epidural anaesthesia were randomly divided into two groups. The treatment group received 1000 mg of ethamsylate intravenously before induction of anaesthesia. Blood lost during surgery was measured by a colorimetric technique. Closed suction drains were used and all blood lost after operation collected for measurement. Ethamsylate did not decrease the average volumes of blood lost during or after the operation. Neither did it reduce the requirements for blood transfusion. Although there were no side-effects attributable to ethamyslate, there seems to be no indication for its use in total hip replacement under epidural anaesthesia.

  12. Esophageal Replacement in Children: Presentation of 18 Cases and Results of Their Surgical Procedure

    Directory of Open Access Journals (Sweden)

    S. Delshad

    2007-11-01

    Full Text Available Background:Esophageal replacement is indicated in certain circumstances including long gap esophageal atresia,severe strictures due to gastro-esophageal reflux (GER and caustic burns. We analyzed our results of 18 patients who underwent esophageal replacement in our university hospital. Methods:We reviewed esophageal replacements carried out in our department between June 1996 and August 2004.We report 18 patients(4 girls and 14 boys with ages ranging from 3.5 until 30 months.Fifteen patients had long gap atresia,two had strictures due to GER,and one case had caustic burn. Esophageal replacement was performed through an abdominal midline incision by one of three methods, namely: colon transposition in 15, gastric replacement in 2, and gastric tube in 1 case. Results: Leakage and stricture were the most common complications of esophageal replacement.Most deaths were due to aspiration pneumonia and congenital cardiac disease.Conclusion:Esophageal replacement has limited indications.It allows a good functional result,with adequate oral feeding and normal growth.

  13. Improving compliance with hormonal replacement therapy in primary osteoporosis prevention

    DEFF Research Database (Denmark)

    Vestergaard, P; Hermann, A P; Gram, J

    1997-01-01

    To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule.......To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule....

  14. Mitral-valve repair versus replacement for severe ischemic mitral regurgitation.

    Science.gov (United States)

    Acker, Michael A; Parides, Michael K; Perrault, Louis P; Moskowitz, Alan J; Gelijns, Annetine C; Voisine, Pierre; Smith, Peter K; Hung, Judy W; Blackstone, Eugene H; Puskas, John D; Argenziano, Michael; Gammie, James S; Mack, Michael; Ascheim, Deborah D; Bagiella, Emilia; Moquete, Ellen G; Ferguson, T Bruce; Horvath, Keith A; Geller, Nancy L; Miller, Marissa A; Woo, Y Joseph; D'Alessandro, David A; Ailawadi, Gorav; Dagenais, Francois; Gardner, Timothy J; O'Gara, Patrick T; Michler, Robert E; Kron, Irving L

    2014-01-02

    Ischemic mitral regurgitation is associated with a substantial risk of death. Practice guidelines recommend surgery for patients with a severe form of this condition but acknowledge that the supporting evidence for repair or replacement is limited. We randomly assigned 251 patients with severe ischemic mitral regurgitation to undergo either mitral-valve repair or chordal-sparing replacement in order to evaluate efficacy and safety. The primary end point was the left ventricular end-systolic volume index (LVESVI) at 12 months, as assessed with the use of a Wilcoxon rank-sum test in which deaths were categorized below the lowest LVESVI rank. At 12 months, the mean LVESVI among surviving patients was 54.6±25.0 ml per square meter of body-surface area in the repair group and 60.7±31.5 ml per square meter in the replacement group (mean change from baseline, -6.6 and -6.8 ml per square meter, respectively). The rate of death was 14.3% in the repair group and 17.6% in the replacement group (hazard ratio with repair, 0.79; 95% confidence interval, 0.42 to 1.47; P=0.45 by the log-rank test). There was no significant between-group difference in LVESVI after adjustment for death (z score, 1.33; P=0.18). The rate of moderate or severe recurrence of mitral regurgitation at 12 months was higher in the repair group than in the replacement group (32.6% vs. 2.3%, P<0.001). There were no significant between-group differences in the rate of a composite of major adverse cardiac or cerebrovascular events, in functional status, or in quality of life at 12 months. We observed no significant difference in left ventricular reverse remodeling or survival at 12 months between patients who underwent mitral-valve repair and those who underwent mitral-valve replacement. Replacement provided a more durable correction of mitral regurgitation, but there was no significant between-group difference in clinical outcomes. (Funded by the National Institutes of Health and the Canadian Institutes of

  15. Remote sensing estimates of stand-replacement fires in Russia, 2002–2011

    International Nuclear Information System (INIS)

    Krylov, Alexander; Potapov, Peter; Loboda, Tatiana; Tyukavina, Alexandra; Turubanova, Svetlana; Hansen, Matthew C; McCarty, Jessica L

    2014-01-01

    The presented study quantifies the proportion of stand-replacement fires in Russian forests through the integrated analysis of Landsat and Moderate Resolution Imaging Spectroradiometer (MODIS) data products. We employed 30 m Landsat Enhanced Thematic Mapper Plus derived tree canopy cover and decadal (2001–2012) forest cover loss (Hansen et al 2013 High-resolution global maps of 21st-century forest cover change Science 342 850–53) to identify forest extent and disturbance. These data were overlaid with 1 km MODIS active fire (earthdata.nasa.gov/data/near-real-time-data/firms) and 500 m regional burned area data (Loboda et al 2007 Regionally adaptable dNBR-based algorithm for burned area mapping from MODIS data Remote Sens. Environ. 109 429–42 and Loboda et al 2011 Mapping burned area in Alaska using MODIS data: a data limitations-driven modification to the regional burned area algorithm Int. J. Wildl. Fire 20 487–96) to differentiate stand-replacement disturbances due to fire versus other causes. Total stand replacement forest fire area within the Russian Federation from 2002 to 2011 was estimated to be 17.6 million ha (Mha). The smallest stand-replacement fire loss occurred in 2004 (0.4 Mha) and the largest annual loss in 2003 (3.3 Mha). Of total burned area within forests, 33.6% resulted in stand-replacement. Light conifer stands comprised 65% of all non-stand-replacement and 79% of all stand-replacement fire in Russia. Stand-replacement area for the study period is estimated to be two times higher than the reported logging area. Results of this analysis can be used with historical fire regime estimations to develop effective fire management policy, increase accuracy of carbon calculations, and improve fire behavior and climate change modeling efforts. (paper)

  16. Older Person's Guide to Joint Replacement

    Science.gov (United States)

    ... who prep for surgery and follow through with physical therapy afterward can further boost their odds of a good outcome. If you’re considering joint replacement surgery, here’s what the experts with the American Geriatrics Society’s Foundation for Health in Aging (FHA) suggest: Ask ...

  17. Reoperative aortic valve replacement in the octogenarians-minimally invasive technique in the era of transcatheter valve replacement

    NARCIS (Netherlands)

    Kaneko, Tsuyoshi; Loberman, Dan; Gosev, Igor; Rassam, Fadi; McGurk, Siobhan; Leacche, Marzia; Cohn, Lawrence

    2014-01-01

    Objective: Reoperative aortic valve replacement (re-AVR) in octogenarians is considered high risk and therefore might be indicated for transcatheter AVR. The minimally invasive technique for re-AVR limits dissection and might benefit this patient population. We report the outcomes of re-AVR in

  18. BABAR IFR Replacement R and D

    CERN Document Server

    Berry, M

    2003-01-01

    The Instrumented Flux Return (IFR) of the BaBar detector will soon need to be replaced by a more robust muon detection system. Scintillator bars with embedded Wavelength Shifting (WLS) fibers and Limited Streamer Tubes are two replacement technology options. The scintillator bars are tested for attenuation length; and causes for the large width of the Photo Multiplier Tube (PMT) signal are analyzed by Monte Carlo simulation. Cooling techniques for Avalanche Photo Diodes (APD) are investigated. The fairly high attenuation length coupled with the narrow PMT signal make the scintillator a viable option for a muon detecting system. Continuing work will focus on increasing timing resolution using an APD to read the signal from the WLS fibers, and investigating the lifetime of the APD. The ability to read a signal from the LST on external copper strips is tested and signals are found to be clearly distinguishable from noise. The voltage is compared to count rate to find that the optimal operating voltage for the LS...

  19. Rosetta Structure Prediction as a Tool for Solving Difficult Molecular Replacement Problems.

    Science.gov (United States)

    DiMaio, Frank

    2017-01-01

    Molecular replacement (MR), a method for solving the crystallographic phase problem using phases derived from a model of the target structure, has proven extremely valuable, accounting for the vast majority of structures solved by X-ray crystallography. However, when the resolution of data is low, or the starting model is very dissimilar to the target protein, solving structures via molecular replacement may be very challenging. In recent years, protein structure prediction methodology has emerged as a powerful tool in model building and model refinement for difficult molecular replacement problems. This chapter describes some of the tools available in Rosetta for model building and model refinement specifically geared toward difficult molecular replacement cases.

  20. Molecular replacement then and now

    International Nuclear Information System (INIS)

    Scapin, Giovanna

    2013-01-01

    A brief overview, with examples, of the evolution of molecular-replacement methods and models over the past few years is presented. The ‘phase problem’ in crystallography results from the inability to directly measure the phases of individual diffracted X-ray waves. While intensities are directly measured during data collection, phases must be obtained by other means. Several phasing methods are available (MIR, SAR, MAD, SAD and MR) and they all rely on the premise that phase information can be obtained if the positions of marker atoms in the unknown crystal structure are known. This paper is dedicated to the most popular phasing method, molecular replacement (MR), and represents a personal overview of the development, use and requirements of the methodology. The first description of noncrystallographic symmetry as a tool for structure determination was explained by Rossmann and Blow [Rossmann & Blow (1962 ▶), Acta Cryst.15, 24–31]. The term ‘molecular replacement’ was introduced as the name of a book in which the early papers were collected and briefly reviewed [Rossmann (1972 ▶), The Molecular Replacement Method. New York: Gordon & Breach]. Several programs have evolved from the original concept to allow faster and more sophisticated searches, including six-dimensional searches and brute-force approaches. While careful selection of the resolution range for the search and the quality of the data will greatly influence the outcome, the correct choice of the search model is probably still the main criterion to guarantee success in solving a structure using MR. Two of the main parameters used to define the ‘best’ search model are sequence identity (25% or more) and structural similarity. Another parameter that may often be undervalued is the quality of the probe: there is clearly a relationship between the quality and the correctness of the chosen probe and its usefulness as a search model. Efforts should be made by all structural biologists to

  1. Environmentally Optimal, Nutritionally Aware Beef Replacement Plant-Based Diets.

    Science.gov (United States)

    Eshel, Gidon; Shepon, Alon; Noor, Elad; Milo, Ron

    2016-08-02

    Livestock farming incurs large and varied environmental burdens, dominated by beef. Replacing beef with resource efficient alternatives is thus potentially beneficial, but may conflict with nutritional considerations. Here we show that protein-equivalent plant based alternatives to the beef portion of the mean American diet are readily devisible, and offer mostly improved nutritional profile considering the full lipid profile, key vitamins, minerals, and micronutrients. We then show that replacement diets require on average only 10% of land, 4% of greenhouse gas (GHG) emissions, and 6% of reactive nitrogen (Nr) compared to what the replaced beef diet requires. Applied to 320 million Americans, the beef-to-plant shift can save 91 million cropland acres (and 770 million rangeland acres), 278 million metric ton CO2e, and 3.7 million metric ton Nr annually. These nationwide savings are 27%, 4%, and 32% of the respective national environmental burdens.

  2. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  3. The future of rapid bridge deck replacement.

    Science.gov (United States)

    2015-06-01

    Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose : inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction : techniques often use precast member...

  4. 40 CFR 261.35 - Deletion of certain hazardous waste codes following equipment cleaning and replacement.

    Science.gov (United States)

    2010-07-01

    ... codes following equipment cleaning and replacement. 261.35 Section 261.35 Protection of Environment... equipment in accordance with this section; (ii) Prepare and follow an equipment replacement plan and replace equipment in accordance with this section; or (iii) Document cleaning and replacement in accordance with...

  5. Trawsfynydd NPS: the economic and social impact of closure without replacement

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The paper concerns a study of the economic and social effects of the closure of Trawsfynydd Nuclear Power Station without replacement, carried out by the University College of North Wales. Performance of Trawsfynydd, unemployment and demand for replacement, are all discussed. (UK)

  6. A 5-year profile of the incidence of total joint replacement in South ...

    African Journals Online (AJOL)

    During this period there was a 28% increase in the number of TJRs performed annually with an average increase of 20% in total hip replacements and 40% in total knee replacements. The number of surgeons involved in joint replacement during the survey period decreased by 7% in state-subsidised institutions but ...

  7. Toleration, Synthesis or Replacement?

    DEFF Research Database (Denmark)

    Holtermann, Jakob v. H.; Madsen, Mikael Rask

    2016-01-01

    , in order to answer is not yet another partisan suggestion, but rather an attempt at making intelligible both the oppositions and the possibilities of synthesis between normative and empirical approaches to law. Based on our assessment and rational reconstruction of current arguments and positions, we...... therefore outline a taxonomy consisting of the following three basic, ideal-types in terms of the epistemological understanding of the interface of law and empirical studies: toleration, synthesis and replacement. This tripartite model proves useful with a view to teasing out and better articulating...

  8. Moderator inlet line hanger replacement for Pickering nuclear power station

    International Nuclear Information System (INIS)

    Kirkpatrick, R.A.; Bowman, J.M.; Symmons, W.R.; El-Nesr, S.

    1988-01-01

    Ontario Hydro's Pickering Nuclear Generating Station (PNGS), Units 1 and 2 were shutdown for large scale fuel channel replacement. Other nonroutine inspection and maintenance activities were performed to determine the overall condition of the units and it was seen that a moderator inlet line hanger (identified as HR-29) had failed in both units. Subsequent inspections during planned maintenance outages of Pickering NGS Units 3 and 4 revealed that hanger HR-29 had failed and required replacement. A research program was conducted to find a suitable technique. These problems included accessing tooling through small inspection ports, manipulating tooling from a significant distance and the high radiation fields within the vault. This paper describes the program undertaken to replace hanger HR-29. (author)

  9. Replacement of the instrumentation and control system of Tore Supra

    International Nuclear Information System (INIS)

    Leveque, P.

    1995-02-01

    The control system of the Tore-Supra is a wide and complex system that cannot be interrupted while running without significant consequences on the operating of the machine. Replacing the current system cannot be achieved in a global way without immobilisation and high costs. Therefore partial changes have been decided on. This work presents the detailed analysis of the arrangements and the operating of the system that will be replaced: the pro's and con's that have appeared through experience are related. The possibilities that the new apparatus offers are also examined. A method of step by step replacements had to be set up in order to assess the means, funds, term of achievement, performance and quality of the overall project. (TEC). 15 refs., 29 figs

  10. Limited versus full sternotomy for aortic valve replacement.

    Science.gov (United States)

    Kirmani, Bilal H; Jones, Sion G; Malaisrie, S C; Chung, Darryl A; Williams, Richard Jnn

    2017-04-10

    Aortic valve disease is a common condition that is easily treatable with cardiac surgery. This is conventionally performed by opening the sternum longitudinally down the centre ("median sternotomy") and replacing the valve under cardiopulmonary bypass. Median sternotomy is generally well tolerated, but as less invasive options have become available, the efficacy of limited incisions has been called into question. In particular, the effects of reducing the visibility and surgical access has raised safety concerns with regards to the placement of cannulae, venting of the heart, epicardial wire placement, and de-airing of the heart at the end of the procedure. These difficulties may increase operating times, affecting outcome. The benefits of smaller incisions are thought to include decreased pain; improved respiratory mechanics; reductions in wound infections, bleeding, and need for transfusion; shorter intensive care stay; better cosmesis; and a quicker return to normal activity. To assess the effects of minimally invasive aortic valve replacement via a limited sternotomy versus conventional aortic valve replacement via median sternotomy in people with aortic valve disease requiring surgical replacement. We performed searches of CENTRAL, MEDLINE, Embase, clinical trials registries, and manufacturers' websites from inception to July 2016, with no language limitations. We reviewed references of identified papers to identify any further studies of relevance. Randomised controlled trials comparing aortic valve replacement via a median sternotomy versus aortic valve replacement via a limited sternotomy. We excluded trials that performed other minimally invasive incisions such as mini-thoracotomies, port access, trans-apical, trans-femoral or robotic procedures. Although some well-conducted prospective and retrospective case-control and cohort studies exist, these were not included in this review. Two review authors independently assessed trial papers to extract data

  11. Affordance estimation for vision-based object replacement on a humanoid robot

    DEFF Research Database (Denmark)

    Mustafa, Wail; Wächter, Mirko; Szedmak, Sandor

    2016-01-01

    In this paper, we address the problem of finding replacements of missing objects, involved in the execution of manipulation tasks. Our approach is based on estimating functional affordances for the unknown objects in order to propose replacements. We use a vision-based affordance estimation syste...

  12. Assessing Window Replacement Options | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  13. A strategy for the phased replacement of CANDU digital control computers

    International Nuclear Information System (INIS)

    Hepburn, G.A.

    2001-01-01

    Significant developments have occurred with respect to the replacement of the Plant Digital Control Computers (DCCs) on CANDU plants in the past six months. This paper summarises the conclusions of the condition assessment carried out on these machines at Point Lepreau Generating Station, and describes a strategy for a phased transition to a replacement system based on today's technology. Most elements of the strategy are already in place, and sufficient technical work has been done to allow those components which have been assessed as requiring prompt attention to be replaced in a matter of months. (author)

  14. Seismic Performances of Replaceable Steel Connection with Low Yield Point Metal

    Directory of Open Access Journals (Sweden)

    Haoxiang He

    2015-01-01

    Full Text Available Compared with the traditional steel rigid connection, the beam-column connections with weakened beam end have better ductility, but the local buckling in the weakened zone and the overall lateral deformation may occur in strong earthquake. The replaceable steel connection with low yield point metal is proposed based on the concept of earthquake resilient structure. In this connection, the weakened parts in the flange slab and web plate are filled with low yield point metal, and the metal firstly yields and dissipates energy sufficiently in earthquake; hence, the main parts are intact and the yield point metal can be replaced. The seismic performances of the three types of connections which include traditional connection, beam end weakened connection, and replaceable connection with low yield point steel under low cycle reciprocating load are studied. In addition, the energy dissipation capacity and damage characteristics of different connections are compared. The multiscale finite element models for the steel frames with different connections are analyzed by time-history method; both the computational efficiency and the accuracy are assured. The analysis results approve that the replaceable connection can confine the major damage in the replacement material and have better energy dissipation ability, safety reserves, and resilient ability.

  15. Soil Overconsolidation Changes Caused by Dynamic Replacement

    Science.gov (United States)

    Piotr, Kanty; Sławomir, Kwiecień; Jerzy, Sękowski

    2017-10-01

    In the dynamic replacement method (DR) the soil is improved by initially dropping a large weight (typically 8-20 t) pounder from a significant height up to 25 m. The created crater is filled with a stronger material (gravel, rubble, stone aggregate, debris), and the pounder is dropped once or multiple times again. The construction of dynamic replacement pillars influences the parameters of the adjacent soil. It results from the energy generated by dropping a pounder into the soil. In the current practice, these changes are not taken into the account during the design. This paper focuses on the changes of overconsolidation ratio (OCR) and in situ coefficient of lateral earth pressure (K) values estimated base on cone penetration test (CPTU) and Dilatometric test (DMT) performed at a test site. A single column was constructed and the ground around the column was examined using CPTU and DMT, performed at different distances from the column centre (2, 3, 4 and 6 m) and at different time intervals (during construction and 1, 8, 30 days later). The column was constructed in so-called transition soils (between cohesive and non-cohesive). While interpreting the results of the research, the authors addressed the matter of choosing the procedure of OCR and K indication for transition soils (in this case described as silts and/or sandy silts). Overconsolidation changes may differ depending on the chosen analysis procedure (for cohesive or non-cohesive soils). On the basis of the analysis presented in the paper and the observation of soil (acknowledged as cohesive according to macroscopic observations) during column excavation, it was decided that for more detailed analyses methods dedicated to cohesive soils should be applied. Generally, it can be stated that although the changes were complex, DR pillar formation process resulted in the increase of these parameters. The average increases of OCR and K values were 25% and 10% respectively. The post installation values are not

  16. A kinetic study of the replacement of calcite marble by fluorite

    Science.gov (United States)

    Trindade Pedrosa, Elisabete; Boeck, Lena; Putnis, Christine V.; Putnis, Andrew

    2016-04-01

    Replacement reactions are relevant in any situation that involves the reequilibration between a solid and an aqueous fluid phase and are commonly controlled by an interface-coupled dissolution-precipitation mechanism (Putnis and Putnis, 2007). These reactions control many large-scale Earth processes whenever aqueous fluids are available, such as during metamorphism, metasomatism, and weathering. An important consequence of coupled dissolution-precipitation is the generation of porosity in the product phase that then allows the infiltration of the fluid within the mineral being replaced. Understanding the mechanism and kinetics of the replacement of carbonates by fluorite has application in earth sciences and engineering. Fluorite (CaF2) occurs in all kinds of rocks (igneous, sedimentary, and metamorphic) and its origin is commonly associated with hydrothermal fluids. Moreover, calcium carbonate has been suggested as a successful seed material for the sequestration of fluoride from contaminated waters (Waghmare and Arfin, 2015). The aim of the present work is to investigate aspects of the replacement of calcium carbonate by fluorite to better understand the mechanism and kinetics of this reaction. Small cubes (˜ 3 × 3 × 3 mm) of Carrara marble (CaCO3 > 99 %) were cut and reacted with a 4 M ammonium fluoride (NH4F) solution for different times (1 to 48 hours) and temperatures (60, 80, 100, and 140 ° C). The microstructure of the product phases was analysed using SEM. The kinetics of replacement was monitored from the Rietveld analysis of X-ray powder diffraction patterns of the products as a function of temperature and reaction time. After reaction, all samples preserved their size and external morphology (a pseudomorphic replacement) and the product phase (fluorite) was highly porous. The activation energy Ea (kJ/mol) of the replacement reaction was empirically determined by both model-fitting and model-free methods. The isoconversional method yielded an

  17. Type II dehydroquinase: molecular replacement with many copies

    International Nuclear Information System (INIS)

    Stewart, Kirsty Anne; Robinson, David Alexander; Lapthorn, Adrian Jonathan

    2007-01-01

    The type II dehydroquinase enzyme is a symmetrical dodecameric protein which crystallizes in either high-symmetry cubic space groups or low-symmetry crystal systems with multiple copies in the asymmetric unit. Both systems have provided challenging examples for molecular replacement; for example, a triclinic crystal form has 16 dodecamers (192 monomers) in the unit cell. Three difficult examples are discussed and two are used as test cases to compare the performance of four commonly used molecular-replacement packages. Type II dehydroquinase is a small (150-amino-acid) protein which in solution packs together to form a dodecamer with 23 cubic symmetry. In crystals of this protein the symmetry of the biological unit can be coincident with the crystallographic symmetry, giving rise to cubic crystal forms with a single monomer in the asymmetric unit. In crystals where this is not the case, multiple copies of the monomer are present, giving rise to significant and often confusing noncrystallographic symmetry in low-symmetry crystal systems. These different crystal forms pose a variety of challenges for solution by molecular replacement. Three examples of structure solutions, including a highly unusual triclinic crystal form with 16 dodecamers (192 monomers) in the unit cell, are described. Four commonly used molecular-replacement packages are assessed against two of these examples, one of high symmetry and the other of low symmetry; this study highlights how program performance can vary significantly depending on the given problem. In addition, the final refined structure of the 16-dodecamer triclinic crystal form is analysed and shown not to be a superlattice structure, but rather an F-centred cubic crystal with frustrated crystallographic symmetry

  18. Refrigerator retirement and replacement programs : lessons learned and application to an Ontario wide program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-05-15

    The best practices in refrigerator retirement programs in North America were identified in an effort to develop a concept for an Ontario-wide provincial refrigerator retirement program. The report focused on describing refrigerator retirement programs, namely those programs that focused on getting rid of old secondary refrigerators. The report excluded refrigerator replacement programs, which encourage householders to retire their refrigerators early and replace them with an energy star refrigerator. However, it was noted that in several regions, both replacement and retirement programs are offered at the same time. The report provided background information on energy use by refrigerators as well as refrigerator retirement and replacement programs. Types of refrigerator retirement and replacement programs and the environmental benefits of these programs were also described. The report also addressed the potential energy impact of an Ontario-wide refrigerator retirement program as well as consumer incentive and bounties initiatives to encourage households to retire units. Other topics covered in the report included the design of typical refrigerator retirement and replacement programs; collection and recycling of retired refrigerators; reported costs of refrigerator retirement and replacement programs; as well as marketing and advertising. The role of retailers and manufacturers and reported lessons learned from refrigerator retirement and replacement were also presented. 14 refs., 6 tabs., 6 appendices.

  19. High Phenobarbital Clearance During Continuous Renal Replacement Therapy

    Science.gov (United States)

    Rosenborg, Staffan; Saraste, Lars; Wide, Katarina

    2014-01-01

    Abstract Phenobarbital is an old antiepileptic drug used in severe epilepsy. Despite this, little is written about the need for dose adjustments in renal replacement therapy. Most sources recommend a moderately increased dose guided by therapeutic drug monitoring. A 14 year old boy with nonketotic hyperglycinemia, a rare inborn error of metabolism, characterized by high levels of glycine, epilepsy, spasticity, and cognitive impairment, was admitted to the emergency department with respiratory failure after a few days of fever and cough. The boy was unconscious at admittance and had acute renal and hepatic failure. Due to the acute respiratory infection, hypoxic hepatic and renal failure occurred and the patient had a status epilepticus. The patient was intubated and mechanically ventilated. Continuous renal replacement therapy was initiated. Despite increased phenobarbital doses, therapeutic levels were not reached until the dose was increased to 500 mg twice daily. Therapeutic drug monitoring was performed in plasma and dialysate. Calculations revealed that phenobarbital was almost freely dialyzed. Correct dosing of drugs in patients on renal replacement therapy may need a multidisciplinary approach and guidance by therapeutic drug monitoring. PMID:25101986

  20. Hormone Replacement Therapy: MedlinePlus Health Topic

    Science.gov (United States)

    ... of hormone therapy (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hormone Replacement Therapy ... Estrogen overdose Types of hormone therapy Related Health Topics Menopause National Institutes of Health The primary NIH ...