WorldWideScience

Sample records for replacement warhead rrw

  1. The Reliable Replacement Warhead Program: Background and Current Developments

    National Research Council Canada - National Science Library

    Medalia, Jonathan

    2008-01-01

    ...), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992...

  2. RRW: repeated random walks on genome-scale protein networks for local cluster discovery

    Directory of Open Access Journals (Sweden)

    Can Tolga

    2009-09-01

    Full Text Available Abstract Background We propose an efficient and biologically sensitive algorithm based on repeated random walks (RRW for discovering functional modules, e.g., complexes and pathways, within large-scale protein networks. Compared to existing cluster identification techniques, RRW implicitly makes use of network topology, edge weights, and long range interactions between proteins. Results We apply the proposed technique on a functional network of yeast genes and accurately identify statistically significant clusters of proteins. We validate the biological significance of the results using known complexes in the MIPS complex catalogue database and well-characterized biological processes. We find that 90% of the created clusters have the majority of their catalogued proteins belonging to the same MIPS complex, and about 80% have the majority of their proteins involved in the same biological process. We compare our method to various other clustering techniques, such as the Markov Clustering Algorithm (MCL, and find a significant improvement in the RRW clusters' precision and accuracy values. Conclusion RRW, which is a technique that exploits the topology of the network, is more precise and robust in finding local clusters. In addition, it has the added flexibility of being able to find multi-functional proteins by allowing overlapping clusters.

  3. Split warhead simultaneous impact

    Directory of Open Access Journals (Sweden)

    Rahul Singh Dhari

    2017-12-01

    Full Text Available A projectile system is proposed to improve efficiency and effectiveness of damage done by anti-tank weapon system on its target by designing a ballistic projectile that can split into multiple warheads and engage a target at the same time. This idea has been developed in interest of saving time consumed from the process of reloading and additional number of rounds wasted on target during an attack. The proposed system is achieved in three steps: Firstly, a mathematical model is prepared using the basic equations of motion. Second, An Ejection Mechanism of proposed warhead is explained with the help of schematics. Third, a part of numerical simulation which is done using the MATLAB software. The final result shows various ranges and times when split can be effectively achieved. With the new system, impact points are increased and hence it has a better probability of hitting a target.

  4. Detecting nuclear warheads

    International Nuclear Information System (INIS)

    Fetter, S.; Frolov, V.A.; Prilutsky, O.F.; Rodionov, S.N.; Sagdeev, R.Z.; Miller, M.

    1992-01-01

    To the best of our knowledge, all nuclear weapons contain at least several kilograms of fissile material - material that can sustain a chain reaction. Such material provides the energy for fission explosives such as those that destroyed Hiroshima and Nagasaki; it is also used in the fission trigger modern thermonuclear weapons. The two fissile materials used in US and Soviet warheads are weapon grade uranium (WgU) and weapon-grade plutonium (WgPu). Fissile materials are radioactive; they are very dense and absorb certain radiations very well; and they can be fissioned. This paper reports on the two basic ways to detect fissile material: passive detection of the radiation emitted by its radioactive decay, or active detection involving either radiographing (x-raying) an object with neutrons or high-energy photons and detecting particles emitted by the resulting induced fissions. Passive detection is the preferred technique for verification purposes because of its simplicity and safety

  5. Warhead Monitoring Planning and Execution

    Energy Technology Data Exchange (ETDEWEB)

    Nakae, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-12-05

    The Warhead Measurement Campaign is a multi-laboratory project lead by the Los Alamos National Laboratory. The project will measure several items of the US nuclear weapons stockpile with a wide range of radiation detection systems. This report provides a brief summary of those LLNL executed activities for the Warhead Measurement Campaign from FY11 through FY16. A more detailed description of all of LLNL’s activiites for the WMC will be presented in the final report of a follow-on project, , LA17-V-Wx.

  6. Transparency in nuclear warhead dismantlement -- Limited chain of custody and warhead signatures

    International Nuclear Information System (INIS)

    Kiernan, G.; Percival, M.; Bratcher, L.

    1996-01-01

    The goal of the US Safeguards, Transparency, and Irreversibility (STI) initiative is the development of a series of transparency measures that provide confidence that nuclear warheads are actually being dismantled and that the fissile material being removed from these dismantled weapons is not recycled into new production. A limited chain of custody (LCC) would follow a warhead from the time it is declared excess until it is actually dismantled and the fissile materials are stored. Measurement of warhead signatures is an option in LCC using radiation detection techniques to confirm that a warhead has been dismantled, without intrusive inspections within the dismantlement facility. This paper discusses LCC and warhead signatures as well as indicate first results of laboratory measurements related to warhead signatures

  7. Warhead and fissile-material declarations

    International Nuclear Information System (INIS)

    von Hippel, F.

    1992-01-01

    Until recently, arms control agreements were limited by the fact that the only available verification capabilities were national technical means, which involved instruments in space or beyond national borders. As a result, the SALT II treaty constrained only the construction of large missile silos, ballistic-missile submarines and long-range bombers - and limited the flight testing of long-range ballistic missiles. Recently, however, on-site verification has been accepted, making it possible in the INF treaty to extend controls to small mobile missiles and their launchers. This paper therefore outlines a comprehensive system of verifiable limits on nuclear warheads. The authors discuss in some detail the verifiability of a halt in the production of fissile materials for nuclear warheads, the verifiability of declarations of the amounts of fissile material produced for warheads prior to the production cutoff, and the establishment of a verifiable accounting system for the numbers and types of nuclear warheads possessed by each side

  8. Warheads and Fissile Materials:Declarations and Counting

    International Nuclear Information System (INIS)

    Sutcliffe, W.G.

    1991-01-01

    This paper reviews some of the issues about verifying the dismantlement of nuclear warheads and controlling nuclear materials in the context of arms control objectives. It is asserted that information about the stockpiles of nuclear warheads and materials is necessary to analyze the impacts and verification requirements of arms control measures including warhead dismantlement and fissile material controls. It is proposed that the US and the Soviets engage in a series of declarations about their stockpiles of nuclear weapons and materials. It is also asserted that currently it is more important to verify that warheads are retired to safe, secure facilities than to verify their dismantlement. It is proposed that production of new or rebuilt warheads be limited to less than the number retired each year. Verifying the number of new and rebuilt warheads deployed and the number retired avoids many of the difficulties in verifying dismantlement and material controls

  9. Accident-resistant container: safety for warhead transport. Executive summary

    International Nuclear Information System (INIS)

    Berry, R.E.

    1975-11-01

    Development testing of model and full-scale hardware to the abnormal environments created during a cargo aircraft crash has demonstrated that the accident-resistant container (ARC) can protect an enclosed warhead from these abnormal environments. This protection reduces the probability of initiation of the warhead HE. Transfer of the plutonium limit to the ARC may permit transporting increased numbers of warheads on a single transport vehicle. Testing of one warhead configuration has been completed. Production can be initiated for transporting that system in the ARC. Other systems need test evaluation and certification before being transported in the ARC

  10. Measurement approaches to support future warhead arms control transparency

    International Nuclear Information System (INIS)

    Olinger, C.T.; Frankle, C.M.; Johnson, M.W.; Poths, J.

    1998-01-01

    Transparency on warhead stockpiles, warhead dismantlement, and fissile material stockpiles in nuclear weapons states will become increasingly important in the move beyond START II toward lower quantities of warheads. Congressional support for further warhead reductions will likely depend on the degree of irreversibility, or in other words, the rapidity with which warhead inventories could be reconstituted. Whether irreversibility considerations can be satisfied will depend on monitoring dismantlement as well as constraining the available stockpile of fissile materials for possible refabrication into warheads. Measurement techniques designed to address the above problems will need to consider NPT Article 1 obligations as well as Russian and US classification regulations, which prohibit or restrict the transfer of nuclear warhead design information to other states. Classification considerations currently limit the potential completeness of future inspections of weapons materials. Many conventional international safeguards approaches are not currently viable for arms control applications because they would reveal weapons design information. The authors discuss a variety of technical measures that may help to improve transparence of warhead and fissile material stockpiles and may enable limited warhead dismantlement transparency

  11. Precession feature extraction of ballistic missile warhead with high velocity

    Science.gov (United States)

    Sun, Huixia

    2018-04-01

    This paper establishes the precession model of ballistic missile warhead, and derives the formulas of micro-Doppler frequency induced by the target with precession. In order to obtain micro-Doppler feature of ballistic missile warhead with precession, micro-Doppler bandwidth estimation algorithm, which avoids velocity compensation, is presented based on high-resolution time-frequency transform. The results of computer simulations confirm the effectiveness of the proposed method even with low signal-to-noise ratio.

  12. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  13. Reducing neutron multiplicity counting bias for plutonium warhead authentication

    Energy Technology Data Exchange (ETDEWEB)

    Goettsche, Malte

    2015-06-05

    Confidence in future nuclear arms control agreements could be enhanced by direct verification of warheads. It would include warhead authentication. This is the assessment based on measurements whether a declaration that a specific item is a nuclear warhead is true. An information barrier can be used to protect sensitive information during measurements. It could for example show whether attributes such as a fissile mass exceeding a threshold are met without indicating detailed measurement results. Neutron multiplicity measurements would be able to assess a plutonium fissile mass attribute if it were possible to show that their bias is low. Plutonium measurements have been conducted with the He-3 based Passive Scrap Multiplicity Counter. The measurement data has been used as a reference to test the capacity of the Monte Carlo code MCNPX-PoliMi to simulate neutron multiplicity measurements. The simulation results with their uncertainties are in agreement with the experimental results. It is essential to use cross-sections which include neutron scattering with the detector's polyethylene molecular structure. Further MCNPX-PoliMi simulations have been conducted in order to study bias that occurs when measuring samples with large plutonium masses such as warheads. Simulation results of solid and hollow metal spheres up to 6000 g show that the masses are underpredicted by as much as 20%. The main source of this bias has been identified in the false assumption that the neutron multiplication does not depend on the position where a spontaneous fission event occurred. The multiplication refers to the total number of neutrons leaking a sample after a primary spontaneous fission event, taking induced fission into consideration. The correction of the analysis has been derived and implemented in a MATLAB code. It depends on four geometry-dependent correction coefficients. When the sample configuration is fully known, these can be exactly determined and remove this type of

  14. Simulation of natural fragmentation of rings cut from warheads

    Directory of Open Access Journals (Sweden)

    John F. Moxnes

    2015-12-01

    Full Text Available Natural fragmentation of warheads that detonates causes the casing of the warhead to split into various sized fragments through shear or radial fractures depending on the toughness, density, and grain size of the material. The best known formula for the prediction of the size distribution is the Mott formulae, which is further examined by Grady and Kipp by investigating more carefully the statistical most random way of portioning a given area into a number of entities. We examine the fragmentation behavior of radially expanding steel rings cut from a 25 mm warhead by using an in house smooth particle hydrodynamic (SPH simulation code called REGULUS. Experimental results were compared with numerical results applying varying particle size and stochastic fracture strain. The numerically obtained number of fragments was consistent with experimental results. Increasing expansion velocity of the rings increases the number of fragments. Statistical variation of the material parameters influences the fragment characteristics, especially for low expansion velocities. A least square regression fit to the cumulative number of fragments by applying a generalized Mott distribution shows that the shape parameter is around 4 for the rings, which is in contrast to the Mott distribution with a shape parameter of ½. For initially polar distributed particles, we see signs of a bimodal cumulative fragment distribution. Adding statistical variation in material parameters of the fracture model causes the velocity numerical solutions to become less sensitive to changes in resolution for Cartesian distributed particles.

  15. Concept of Operations for Nuclear Warhead Embedded Sensors

    Energy Technology Data Exchange (ETDEWEB)

    Rockett, P D; Koncher, T R

    2012-05-16

    Embedded arms-control-sensors provide a powerful new paradigm for managing compliance with future nuclear weapons treaties, where deployed warhead numbers will be reduced to 1000 or less. The CONOPS (Concept of Operations) for use with these sensors is a practical tool with which one may help define design parameters, including size, power, resolution, communications, and physical structure. How frequently must data be acquired and must a human be present? Will such data be acquired for only stored weapons or will it be required of deployed weapons as well? Will tactical weapons be subject to such monitoring or will only strategic weapons apply? Which data will be most crucial? Will OSI's be a component of embedded sensor data management or will these sensors stand alone in their data extraction processes? The problem space is massive, but can be constrained by extrapolating to a reasonable future treaty regime and examining the bounded options this scenario poses. Arms control verification sensors, embedded within the warhead case or aeroshell, must provide sufficient but not excessively detailed data, confirming that the item is a nuclear warhead and that it is a particular warhead without revealing sensitive information. Geolocation will be provided by an intermediate transceiver used to acquire the data and to forward the data to a central processing location. Past Chain-of-Custody projects have included such devices and will be primarily responsible for adding such indicators in the future. For the purposes of a treaty regime a TLI will be verified as a nuclear warhead by knowledge of (a) the presence and mass of SNM, (b) the presence of HE, and (c) the reporting of a unique tag ID. All of these parameters can be obtained via neutron correlation measurements, Raman spectroscopy, and fiber optic grating fabrication, respectively. Data from these sensors will be pushed out monthly and acquired nearly daily, providing one of several verification layers in

  16. Flying Posture of Tandem Warhead Influences its Penetrating and Following Performance

    Directory of Open Access Journals (Sweden)

    Jin-tao Wang

    2014-02-01

    Full Text Available In this study, we investigated a novel monolithic tandem penetrating-blast warhead, which can destroy targets with adjustable parameters including attack velocity, angles, as well as yaw angles. Different flying postures determine different performance of the precursory EFP in penetration process and its following projectile in secondary process. In order to characterize the influence of flying posture, we established a finite elements analysis model. This model has been verified by a static experiment. Our results indicated that the attack velocity of the warhead has tiny influence of the penetration process. However, larger attack angle of the warhead will lead to bad performance of the warhead. Meanwhile, yaw angle range should be controlled in small values due to its randomness. The comprehensive properties of the tandem warhead meet the design requirement, and it is able to damage the target effectively.

  17. Disposition of plutonium from dismantled warheads: Belgonucleaire's proposal

    International Nuclear Information System (INIS)

    Haas, D.; Vanderborck, Y.; Vandenberg, C.; Vliet, J. van

    1996-01-01

    Set up in 1957 by Union Miniere, Belgonucleaire (BN) has been working since its origin in the field of plutonium and has accumulated extensive experience in the design and fabrication of mixed-oxide (MOX) fuel, as well as in the fuel management and licensing of MOX cores for fast breeder reactors (FBRs), pressurized water reactors (PWRs), and boiling water reactors (BWRs). Although BN's MOX plant first went into operation in 1973 (it was used for FBRs and light water reactor (LWR) demonstration fuel fabrication), industrial production started in 1986. The MOX fuel produced (280 t heavy metal (HM) until the end of 1995) has been loaded in PWRs and BWRs in four countries in Europe: France, Germany, Switzerland, and Belgium. They propose the development of MOX plants as the means for disposal of plutonium from warhead disassembly

  18. Investigation of the protection possibilities against enhanced radiation warhead

    International Nuclear Information System (INIS)

    Sahin, S.; Erisen, A.; Selvi, S.; Yalcin, S.

    1980-01-01

    To evaluate an enhanced radiation protection for the tank crew against the neutron bomb, we first have analysed the propagation of the 14.1 MeV neutron in air in S 8 approximation. Three new tank wall proposals for enhanced radiation protection have been discussed in S 4 approximation. The best protection for the tank crew against the neutron bomb radiation has been achieved by covering the internal tank wall with a borated polyethylene layer. However the radiation damage through the neutron bomb cannot be degradated to the radiation damage level by a standard nuclear warhead of comparable energy release. In the course of this study a 27 group hard spectra data library has been used. (orig.) 891 HP/orig. 892 CKA [de

  19. Numerical simulations of semi-armor-piercing warhead penetrating aircraft carrier target

    OpenAIRE

    Dong Sangqaing; Cai Xinghui; Wang Guoliang; Gao Yunliang; Lu Jiangren

    2015-01-01

    FEM models of semi-armor-piercing warhead penetrating aircraft carrier deck are established, which are validated by related experimental data. Base on the models, the process of semi-armor-piercing warhead penetrating aircraft carrier deck with different incidence angles and attack angles are carried out. The results show that incidence angles have no remarkable influence on penetration capability of the projectile under the circumstance of zero attack angle. Ductility reaming damage mode and...

  20. Behavior Characteristics of Type I (75/25) Octol during Melt Pouring HE Warhead M250 (Chaparral)

    Science.gov (United States)

    1979-09-01

    COVERED BEHAVIOR CHARACTERISTICS OF TYPE 1 (75/25) "OCTOL DURING MELT POURING HE WARHEAD I M250 (CHAPARRAL) 6. PERFORMING ORG. APrPORT NUMBER 7. AUTHOR...Military Specification, HMX, MIL-H-45444B, Amendment 2, dated 12 July 1977. 4 6. Military Specification, Warhead, Guided Missile, HE, M250 , Loading...CHARACTERISTICS OF TYPE i (75/25) OCTOL DURING MELT POURING HE WARHEAD M250 (CHAPARRAL) HERMAN J. FRIGAND SEPTEMBER 1979 US ARMY ARMAMENT RESEARCH AND

  1. Securing nuclear warheads and materials: seven steps for immediate action

    International Nuclear Information System (INIS)

    Bunn, M.

    2002-01-01

    Full text: In the last decade, substantial progress has been made in improving security and accounting for nuclear weapons and weapons-usable nuclear material worldwide, both by states' own domestic actions and through international cooperation. Thousands of nuclear warheads and hundreds of tons of nuclear material are demonstrably more secure than they were before, and through programs such as the U.S.-Russian Highly Enriched Uranium (He) Purchase Agreement, enough potentially vulnerable bomb material for thousands of nuclear weapons has been verifiably destroyed. Since the attacks of September 11, 2001, the international community has attempted to expand and accelerate these efforts. But much more remains to be done. This paper summarizes a recent report from Harvard University, which recommended seven further steps for immediate action in U.S.-Russian and international cooperation. It covers two recommendations that may be of particular interest to this audience in detail. The first is a proposed program to remove nuclear material entirely from many of the most vulnerable sites around the world (by offering incentives targeted to the needs of each facility to give up the material at that site). The second is a suggestion that participants in the global partnership against the spread of weapons and materials of mass destruction announced at the June 2002 Group of Eight summit make a political commitment to meet stringent security standards for nuclear materials on their territories, and urge (and assist) other states to do likewise. (author)

  2. Just what exactly is a warhead? An analysis of Russian/English translations and definitions

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, A.

    1998-06-01

    That there are significant definitional differences between languages is a statement of the obvious. It logically follows that definitional ambiguity occurs when translating a term from one language to another. The far-reaching implications of this fact, however, are not as widely recognized. One word that has been and will continue to be significant is warhead. This analysis (1) examines the different translations and definitions of the word warhead in English and Russian; (2) discusses the usage of warhead in the context of arms control; and (3) explores the implications definitional differences have for future negotiations. It specifically utilizes treaty texts, as well as the Helsinki agreement text, to construct a contextual use of warhead. It is concluded that if US policymakers are committed to including nuclear explosive devices in START III force reductions, negotiators must identify and use a more specific term than warhead or boyegolovka. Also included as an appendix are copies of the signed Helsinki agreement in both English and Russian.

  3. Just what exactly is a warhead? An analysis of Russian/English translations and definitions

    International Nuclear Information System (INIS)

    Hadley, A.

    1998-06-01

    That there are significant definitional differences between languages is a statement of the obvious. It logically follows that definitional ambiguity occurs when translating a term from one language to another. The far-reaching implications of this fact, however, are not as widely recognized. One word that has been and will continue to be significant is warhead. This analysis (1) examines the different translations and definitions of the word warhead in English and Russian; (2) discusses the usage of warhead in the context of arms control; and (3) explores the implications definitional differences have for future negotiations. It specifically utilizes treaty texts, as well as the Helsinki agreement text, to construct a contextual use of warhead. It is concluded that if US policymakers are committed to including nuclear explosive devices in START III force reductions, negotiators must identify and use a more specific term than warhead or boyegolovka. Also included as an appendix are copies of the signed Helsinki agreement in both English and Russian

  4. Applying the neutron scatter camera to treaty verification and warhead monitoring

    International Nuclear Information System (INIS)

    Cooper, Robert Lee; Gerling, Mark; Brennan, James S.; Mascarenhas, Nicholas; Mrowka, Stanley; Marleau, Peter

    2010-01-01

    The neutron scatter camera was originally developed for a range of SNM detection applications. We are now exploring the feasibility of applications in treaty verification and warhead monitoring using experimentation, maximum likelihood estimation method (MLEM), detector optimization, and MCNP-PoliMi simulations.

  5. Experimental Studies on Improved Plastic Bonded Explosives Materials (PBXs for Controlled Fragmentation Warheads

    Directory of Open Access Journals (Sweden)

    Elsharkawy Karim

    2017-01-01

    Full Text Available This paper describes formulations of plastic bonded explosives (PBXs based on three highly brisant explosives, namely 1,3,5-trinitro-1,3,5-triazinane (RDX, 1,3,5,7-tetranitro-1,3,5,7-tetrazocane (HMX and pentaerythritoltetranitrate (PETN with polyurethane (PU based on Glycidyl azide polymer (GAP as an energetic binder in comparison with composition-B, which used in the fragmentation warheads. The sensitivity and performance properties of different types of PBXs were evaluated by experimental results of prepared selected PBX compositions. Casting technique was used to prepare the selected compositions containing 14% PU based on GAP. It has been observed that the brisance of the PBX based on HMX was higher than that of comp-B by 21.3 %, the detonation velocity showed a remarkable increase of the order of 8480 (m/s while that of comp-B was 7638 (m/s. A controlled fragmentation warhead with an outer grooving warhead case of dimensions 100x35x4 mm was used and arena test was carried out to determine the lethal zone of the fragmentation warhead. The lethal zone obtained from arena test for PBX composition based on HMX named PBXHG4 was higher than that based on RDX or PETN, and than that of comp-B by 40%.

  6. A treaty more alarming than efficient. The dismantled warheads will not be destroyed. Danger

    International Nuclear Information System (INIS)

    Riche, P.; Despic-Popovic, H.; Nougayrede, N.

    2002-01-01

    This political analysis presents the new treaty of nuclear weapons dismantling between Russia and Usa. In fact the warheads will not be completely dismantling but only stocked, leading to a possible recovery by terrorists. It underlines the real interests of this agreement which are more economic than peaceful. (A.L.B.)

  7. Warhead verification as inverse problem: Applications of neutron spectrum unfolding from organic-scintillator measurements

    Science.gov (United States)

    Lawrence, Chris C.; Febbraro, Michael; Flaska, Marek; Pozzi, Sara A.; Becchetti, F. D.

    2016-08-01

    Verification of future warhead-dismantlement treaties will require detection of certain warhead attributes without the disclosure of sensitive design information, and this presents an unusual measurement challenge. Neutron spectroscopy—commonly eschewed as an ill-posed inverse problem—may hold special advantages for warhead verification by virtue of its insensitivity to certain neutron-source parameters like plutonium isotopics. In this article, we investigate the usefulness of unfolded neutron spectra obtained from organic-scintillator data for verifying a particular treaty-relevant warhead attribute: the presence of high-explosive and neutron-reflecting materials. Toward this end, several improvements on current unfolding capabilities are demonstrated: deuterated detectors are shown to have superior response-matrix condition to that of standard hydrogen-base scintintillators; a novel data-discretization scheme is proposed which removes important detector nonlinearities; and a technique is described for re-parameterizing the unfolding problem in order to constrain the parameter space of solutions sought, sidestepping the inverse problem altogether. These improvements are demonstrated with trial measurements and verified using accelerator-based time-of-flight calculation of reference spectra. Then, a demonstration is presented in which the elemental compositions of low-Z neutron-attenuating materials are estimated to within 10%. These techniques could have direct application in verifying the presence of high-explosive materials in a neutron-emitting test item, as well as other for treaty verification challenges.

  8. Shielding requirements for the transport of nuclear warhead components under decommissioning

    International Nuclear Information System (INIS)

    Hansen, L.F.

    1994-09-01

    The requirements to carry out accurate shielding calculations involved with the safe off-site transportation of packages containing nuclear warhead components, special assemblies and radioactive materials are discussed. The need for (a) detailed information on the geometry and material composition of the packaging and radioactive load, (b) accurate representation of the differential energy spectra (dN/dE) for the neutron and gamma spectra emitted by the radioactive materials enclosed in the packaging, (c) well-tested neutron and photon cross section libraries, (d) and accurate three-dimensional Monte Carlo transport codes are illustrated. A brief discussion of the need for reliable dose measurements is presented

  9. A new method of passive counting of nuclear missile warheads -a white paper for the Defense Threat Reduction Agency

    Energy Technology Data Exchange (ETDEWEB)

    Morris, Christopher [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Durham, J. Matthew [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Guardincerri, Elena [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bacon, Jeffrey Darnell [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wang, Zhehui [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Fellows, Shelby [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Poulson, Daniel Cris [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Plaud-Ramos, Kenie Omar [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Daughton, Tess Marie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Johnson, Olivia Ruth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-31

    Cosmic ray muon imaging has been studied for the past several years as a possible technique for nuclear warhead inspection and verification as part of the New Strategic Arms Reduction Treaty between the United States and the Russian Federation. The Los Alamos team has studied two different muon imaging methods for this application, using detectors on two sides and one side of the object of interest. In this report we present results obtained on single sided imaging of configurations aimed at demonstrating the potential of this technique for counting nuclear warheads in place with detectors above the closed hatch of a ballistic missile submarine.

  10. A New Approach to Nuclear Warhead Verification Using a Zero-Knowledge Protocol

    Energy Technology Data Exchange (ETDEWEB)

    Glaser,; Alexander, [Princeton University

    2012-05-16

    Warhead verification systems proposed to date fundamentally rely on the use of information barriers to prevent the release of classified design information. Measurements with information carriers significantly increase the complexity of inspection systems, make their certification and authentication difficult, and may reduce the overall confidence in the verifiability of future arms- control agreements. This talk presents a proof-of-concept of a new approach to nuclear warhead verification that minimizes the role of information barriers from the outset and envisions instead an inspection system that a priori avoids leakage of sensitive information using a so-called zero-knowledge protocol. The proposed inspection system is based on the template-matching approach and relies on active interrogation of a test object with 14-MeV neutrons. The viability of the method is examined with MCNP Monte Carlo neutron transport calculations modeling the experimental setup, an investigation of different diversion scenarios, and an analysis of the simulated data showing that it does not contain information about the properties of the inspected object.

  11. 75 FR 80536 - Notice Pursuant to the National Cooperative Research and Production Act of 1993 National Warheads...

    Science.gov (United States)

    2010-12-22

    ... Production Act of 1993 National Warheads and Energetics Consortium Notice is hereby given that, on November 30, 2010, pursuant to Section 6(a) of the National Cooperative Research and Production Act of 1993... Mountain Scientific Laboratory, Centennial, CO; Rocky Research, Boulder City, NV; The Research Foundation...

  12. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... Ankle replacement surgery is most often done while you are under general anesthesia. This means you will ...

  13. An NMR-Guided Screening Method for Selective Fragment Docking and Synthesis of a Warhead Inhibitor

    Directory of Open Access Journals (Sweden)

    Ram B. Khattri

    2016-07-01

    Full Text Available Selective hits for the glutaredoxin ortholog of Brucella melitensis are determined using STD NMR and verified by trNOE and 15N-HSQC titration. The most promising hit, RK207, was docked into the target molecule using a scoring function to compare simulated poses to experimental data. After elucidating possible poses, the hit was further optimized into the lead compound by extension with an electrophilic acrylamide warhead. We believe that focusing on selectivity in this early stage of drug discovery will limit cross-reactivity that might occur with the human ortholog as the lead compound is optimized. Kinetics studies revealed that lead compound 5 modified with an ester group results in higher reactivity than an acrylamide control; however, after modification this compound shows little selectivity for bacterial protein versus the human ortholog. In contrast, hydrolysis of compound 5 to the acid form results in a decrease in the activity of the compound. Together these results suggest that more optimization is warranted for this simple chemical scaffold, and opens the door for discovery of drugs targeted against glutaredoxin proteins—a heretofore untapped reservoir for antibiotic agents.

  14. An NMR-Guided Screening Method for Selective Fragment Docking and Synthesis of a Warhead Inhibitor.

    Science.gov (United States)

    Khattri, Ram B; Morris, Daniel L; Davis, Caroline M; Bilinovich, Stephanie M; Caras, Andrew J; Panzner, Matthew J; Debord, Michael A; Leeper, Thomas C

    2016-07-16

    Selective hits for the glutaredoxin ortholog of Brucella melitensis are determined using STD NMR and verified by trNOE and (15)N-HSQC titration. The most promising hit, RK207, was docked into the target molecule using a scoring function to compare simulated poses to experimental data. After elucidating possible poses, the hit was further optimized into the lead compound by extension with an electrophilic acrylamide warhead. We believe that focusing on selectivity in this early stage of drug discovery will limit cross-reactivity that might occur with the human ortholog as the lead compound is optimized. Kinetics studies revealed that lead compound 5 modified with an ester group results in higher reactivity than an acrylamide control; however, after modification this compound shows little selectivity for bacterial protein versus the human ortholog. In contrast, hydrolysis of compound 5 to the acid form results in a decrease in the activity of the compound. Together these results suggest that more optimization is warranted for this simple chemical scaffold, and opens the door for discovery of drugs targeted against glutaredoxin proteins-a heretofore untapped reservoir for antibiotic agents.

  15. The role of inertial containment fusion in replacing nuclear tests

    Energy Technology Data Exchange (ETDEWEB)

    Schaper, Annette [Hessische Stiftung Friedens- und Konfliktforschung, Frankfurt am Main (Germany)

    2008-07-01

    Nuclear weapon physicists need to understand the process of a nuclear explosion, and their major experimental tools had been nuclear tests. Since a couple of years, the established nuclear weapon states observe a testing moratorium. Nevertheless, they still want to keep their nuclear arsenals, and consequently to ensure the reliability, safety, and security of their nuclear warheads. For this purpose, they use experimental tools that replace nuclear tests, among them ICF. ICF plays a central role in the so-called ''stockpile stewardship program'' that the U.S. has implemented when it participated in the negotiations on a Comprehensive Test Ban Treaty. Several questions arise and are discussed in the presentation: Does ICF allow to simulate the extreme conditions of a nuclear explosion? Which are the functions of nuclear testing that ICF can replace and which are beyond its capabilities? Would ICF be a useful tool for the design of new nuclear warheads? Why are so huge sums spent on ICF in a military context although the usefulness for nuclear weapons seems rather limited?.

  16. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  17. Development of an air cleaning system for dissolving high explosives from nuclear warheads

    Energy Technology Data Exchange (ETDEWEB)

    Bergman, W.; Wilson, K.; Staggs, K.; Wapman, D. [Lawrence Livermore National Lab., CA (United States)

    1997-08-01

    The Department of Energy (DOE) has a major effort underway in dismantling nuclear weapons. In support of this effort we have been developing a workstation for removing the high explosive (HE) from nuclear warheads using hot sprays of dimethyl sulfoxide (DMSO) solvent to dissolve the HE. An important component of the workstation is the air cleaning system that is used to contain DMSO aerosols and vapor and radioactive aerosols. The air cleaning system consists of a condenser to liquefy the hot DMSO vapor, a demister pad to remove most of the DMSO aerosols, a high efficiency particulate air (HEPA) filter to remove the remaining aerosols, an activated carbon filter to remove the DMSO vapor, and a final HEPA filter to meet the redundancy requirement for HEPA filters in radioactive applications. The demister pad is a 4{double_prime} thick mat of glass and steel fibers and was selected after conducting screening tests on promising candidates. We also conducted screening tests on various activated carbons and found that all had a similar performance. The carbon breakthrough curves were fitted to a modified Wheeler`s equation and gave excellent predictions for the effect of different flow rates. After all of the components were assembled, we ran a series of performance tests on the components and system to determine the particle capture efficiency as a function of size for dioctyl sebacate (DOS) and DMSO aerosols using laser particle counters and filter samples. The pad had an efficiency greater than 990% for 0.1 {mu}m DMSO particles. Test results on the prototype carbon filter showed only 70% efficiency, instead of the 99.9% in small scale laboratory tests. Thus further work will be required to develop the prototype carbon filter. 7 refs., 18 figs., 10 tabs.

  18. Increasing transparency of nuclear-warhead and fissile-material stocks as a step toward disarmament -- Proposals for the NPT PrepCom, Geneva

    International Nuclear Information System (INIS)

    2013-04-01

    These proposals made by the International Panel on Fissile Materials IPFM at a conference in Geneva, Switzerland, in April 2013 discuss how increasing transparency can help disarmament efforts. After a short introduction to IPFM and its mission, the action plan on nuclear disarmament is looked at and the various nations involved are listed. A set of baseline declarations proposed are discussed. These include warhead stocks, potential new declarations and fissile material stocks. Monitoring by the International Atomic Energy Authority IAEA is also reviewed. Preparations for future declarations concerning warhead and delivery systems locations, stockpile histories and fissile material production and disposal aspects are reported on. Finally, co-operative verification projects, warhead dismantlement and past fissile material production are examined

  19. The use of helicopter-borne neutron detectors to detect nuclear warheads in the USSR-US Black Sea experiment

    International Nuclear Information System (INIS)

    Belyaev, S.T.; Lebedev, V.I.; Obinyakov, B.A.; Zemlyakov, M.V.; Ryazantsev, V.A.; Armashov, V.M.

    1992-01-01

    This paper reports that the Soviet Navy used a helicopter/ship system called Sovietnik to detect a cruise-missile warhead in the joint USSR-US experiment on the Black Sea, which took place on 5 July 1989. The system consists of a ship-based helicopter, equipped with a neutron detector and processing equipment, associated ship-based equipment. The neutron detector, together with instrumentation for recording preliminary processing, and analysis of initial information, is located on the helicopter, which carries out the measurement while flying slowly past the ship in question

  20. Low-Intrusion Techniques and Sensitive Information Management for Warhead Counting and Verification: FY2011 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Jarman, Kenneth D.; Robinson, Sean M.; McDonald, Benjamin S.; Gilbert, Andrew J.; Misner, Alex C.; Pitts, W. Karl; White, Timothy A.; Seifert, Allen; Miller, Erin A.

    2011-09-01

    Future arms control treaties may push nuclear weapons limits to unprecedented low levels and may entail precise counting of warheads as well as distinguishing between strategic and tactical nuclear weapons. Such advances will require assessment of form and function to confidently verify the presence or absence of nuclear warheads and/or their components. Imaging with penetrating radiation can provide such an assessment and could thus play a unique role in inspection scenarios. Yet many imaging capabilities have been viewed as too intrusive from the perspective of revealing weapon design details, and the potential for the release of sensitive information poses challenges in verification settings. A widely held perception is that verification through radiography requires images of sufficient quality that an expert (e.g., a trained inspector or an image-matching algorithm) can verify the presence or absence of components of a device. The concept of information barriers (IBs) has been established to prevent access to relevant weapon-design information by inspectors (or algorithms), and has, to date, limited the usefulness of radiographic inspection. The challenge of this project is to demonstrate that radiographic information can be used behind an IB to improve the capabilities of treaty-verification weapons-inspection systems.

  1. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  2. Knee Replacement

    Science.gov (United States)

    ... days. Medications prescribed by your doctor should help control pain. During the hospital stay, you'll be encouraged to move your ... exercise your new knee. After you leave the hospital, you'll continue physical ... mobility and a better quality of life. And most knee replacements can be ...

  3. Replacement rod

    International Nuclear Information System (INIS)

    Hatfield, S.C.

    1989-01-01

    This patent describes in an elongated replacement rod for use with fuel assemblies of the type having two end fittings connected by guide tubes with a plurality of rod and guide tube cell defining spacer grids containing rod support features and mixing vanes. The grids secured to the guide tubes in register between the end fittings at spaced intervals. The fuel rod comprising: an asymmetrically beveled tip; a shank portion having a straight centerline; and a permanently diverging portion between the tip and the shank portion

  4. Nuclear Weapons Enterprise Transformation - A Sustainable Approach

    International Nuclear Information System (INIS)

    O'Brien, K H

    2005-01-01

    with an improved vision of the future stockpile and enterprise, and find a path that moves us toward that future. The goal of this approach is to achieve a more affordable, sustainable, and responsive enterprise. In order to transform the enterprise in this way, the SSP warhead designs that drive the enterprise must change. Designs that emphasize manufacturability, certifiability, and increased safety and security can enable enterprise transformation. It is anticipated that such warheads can be certified and sustained with high confidence without nuclear testing. The SSP provides the tools to provide such designs, and can develop replacement designs and produce them for the stockpile. The Cold War currency of optimizing warhead yield-to-weight can be replaced by SSP designs optimizing margin-to-uncertainty. The immediate challenge facing the nuclear weapons enterprise is to find a credible path that leads to this vision of the future stockpile and enterprise. Reliable warheads within a sustainable enterprise can best be achieved by shifting from a program of legacy-warhead refurbishment to one of warhead replacement. The nuclear weapons stockpile and the nuclear weapons enterprise must transform together to achieve this vision. The current Reliable Replacement Warhead (RRW) program represents an approach that can begin this process of transformation. If the RRW program succeeds, the designs, manufacturing complex, and certification strategy can evolve together and in so doing come up with a more cost-efficient solution that meets today's and tomorrow's national security requirements

  5. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; Arthroplasty - shoulder - discharge

  6. Hip joint replacement

    Science.gov (United States)

    Hip arthroplasty; Total hip replacement; Hip hemiarthroplasty; Arthritis - hip replacement; Osteoarthritis - hip replacement ... Your hip joint is made up of 2 major parts. One or both parts may be replaced during surgery: ...

  7. A REPRINT of a July 1991 Report to Congress, Executive Summary of Verification of Nuclear Warhead Dismantlement and Special Nuclear Material Controls

    International Nuclear Information System (INIS)

    Fuller, James L.

    2008-01-01

    With the renewed thinking and debate about deep reductions in nuclear weapons, including recent proposals about eliminating nuclear warheads altogether, republishing the general conclusions of the Robinson Committee Report of 1992 appears useful. The report is sometimes referred to as the 3151 Report, from Section 3151 of the National Defense Authorization Act for FY1991, from where its requirement originated. This report contains the Executive Summary only and the forwarding letters from the Committee, the President of the United States, the Secretary of Energy, and C Paul Robinson, the head of the Advisory Committee

  8. Transcatheter aortic valve replacement

    Science.gov (United States)

    ... gov/ency/article/007684.htm Transcatheter aortic valve replacement To use the sharing features on this page, please enable JavaScript. Transcatheter aortic valve replacement (TAVR) is surgery to replace the aortic valve. ...

  9. Hip Replacement Surgery

    Science.gov (United States)

    ... Outreach Initiative Breadcrumb Home Health Topics English Español Hip Replacement Surgery Basics In-Depth Download Download EPUB ... PDF What is it? Points To Remember About Hip Replacement Surgery Hip replacement surgery removes damaged or ...

  10. Nicotine replacement therapy

    Science.gov (United States)

    Smoking cessation - nicotine replacement; Tobacco - nicotine replacement therapy ... Before you start using a nicotine replacement product, here are some things to know: The more cigarettes you smoke, the higher the dose you may need to ...

  11. A treaty more alarming than efficient. The dismantled warheads will not be destroyed. Danger; Un traite plus inquietant qu'efficace. Les ogives demantelees ne seront pas detruites. Risque

    Energy Technology Data Exchange (ETDEWEB)

    Riche, P.; Despic-Popovic, H.; Nougayrede, N

    2002-07-01

    This political analysis presents the new treaty of nuclear weapons dismantling between Russia and Usa. In fact the warheads will not be completely dismantling but only stocked, leading to a possible recovery by terrorists. It underlines the real interests of this agreement which are more economic than peaceful. (A.L.B.)

  12. Defining line replaceable units

    NARCIS (Netherlands)

    Parada Puig, J. E.; Basten, R. J I

    2015-01-01

    Defective capital assets may be quickly restored to their operational condition by replacing the item that has failed. The item that is replaced is called the Line Replaceable Unit (LRU), and the so-called LRU definition problem is the problem of deciding on which item to replace upon each type of

  13. Ankle replacement - discharge

    Science.gov (United States)

    ... total - discharge; Total ankle arthroplasty - discharge; Endoprosthetic ankle replacement - discharge; Osteoarthritis - ankle ... You had an ankle replacement. Your surgeon removed and reshaped ... an artificial ankle joint. You received pain medicine and were ...

  14. Artificial Disc Replacement

    Science.gov (United States)

    ... Spondylolisthesis BLOG FIND A SPECIALIST Treatments Artificial Disc Replacement (ADR) Patient Education Committee Jamie Baisden The disc ... Disc An artificial disc (also called a disc replacement, disc prosthesis or spine arthroplasty device) is a ...

  15. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series—Normal anatomy To use the sharing ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  16. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  17. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  18. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  19. Aeronautical Information System Replacement -

    Data.gov (United States)

    Department of Transportation — Aeronautical Information System Replacement is a web-enabled, automation means for the collection and distribution of Service B messages, weather information, flight...

  20. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  1. Could wind replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    This article aims at assessing the situation produced by a total replacement of nuclear energy by wind energy, while facing consumption demand at any moment, notably in December. The authors indicate the evolution of the French energy mix during December 2016, and the evolution of the rate between wind energy production and the sum of nuclear and wind energy production during the same month, and then give briefly some elements regarding necessary investments in wind energy to wholly replace nuclear energy. According to them, such a replacement would be ruinous

  2. Slab replacement maturity guidelines.

    Science.gov (United States)

    2014-04-01

    This study investigated the use of maturity method to determine early age strength of concrete in slab : replacement application. Specific objectives were (1) to evaluate effects of various factors on the compressive : maturity-strength relationship ...

  3. Partial knee replacement

    Science.gov (United States)

    ... good range of motion in your knee. The ligaments in your knee are stable. However, most people with knee arthritis have a surgery called a total knee arthroplasty (TKA). Knee replacement is most often done in people age 60 ...

  4. Carbohydrates as Fat Replacers.

    Science.gov (United States)

    Peng, Xingyun; Yao, Yuan

    2017-02-28

    The overconsumption of dietary fat contributes to various chronic diseases, which encourages attempts to develop and consume low-fat foods. Simple fat reduction causes quality losses that impede the acceptance of foods. Fat replacers are utilized to minimize the quality deterioration after fat reduction or removal to achieve low-calorie, low-fat claims. In this review, the forms of fats and their functions in contributing to food textural and sensory qualities are discussed in various food systems. The connections between fat reduction and quality loss are described in order to clarify the rationales of fat replacement. Carbohydrate fat replacers usually have low calorie density and provide gelling, thickening, stabilizing, and other texture-modifying properties. In this review, carbohydrates, including starches, maltodextrins, polydextrose, gums, and fibers, are discussed with regard to their interactions with other components in foods as well as their performances as fat replacers in various systems.

  5. Hip joint replacement - slideshow

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/presentations/100006.htm Hip joint replacement - series—Normal anatomy To use the ... to slide 5 out of 5 Overview The hip joint is made up of two major parts: ...

  6. Tool Inventory and Replacement

    Science.gov (United States)

    Bear, W. Forrest

    1976-01-01

    Vocational agriculture teachers are encouraged to evaluate curriculum offerings, the new trends in business and industry, and develop a master tool purchase and replacement plan over a 3- to 5-year period. (HD)

  7. Knee joint replacement

    Science.gov (United States)

    ... to make everyday tasks easier. Practice using a cane, walker , crutches , or a wheelchair correctly. On the ... ask your doctor Knee joint replacement - discharge Preventing falls Preventing falls - what to ask your doctor Surgical ...

  8. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    . To shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega...... replacement was chosen in each company. Findings – The study shows that platform replacements primarily challenge managers' existing knowledge about platform architectures. A distinction can be made between “width” and “height” in platform replacements, and it is crucial that managers observe this in order...... to challenge their existing knowledge about platform architectures. Issues on technologies, architectures, components and processes as well as on segments, applications and functions are identified. Practical implications – Practical implications are summarized and discussed in relation to a framework...

  9. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  10. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  11. Thyroid hormone replacement therapy

    NARCIS (Netherlands)

    Wiersinga, W. M.

    2001-01-01

    Thyroid hormone replacement has been used for more than 100 years in the treatment of hypothyroidism, and there is no doubt about its overall efficacy. Desiccated thyroid contains both thyroxine (T(4)) and triiodothyronine (T(3)); serum T(3) frequently rises to supranormal values in the absorption

  12. Can photovoltaic replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    As the French law on energy transition for a green growth predicts that one third of nuclear energy production is to be replaced by renewable energies (wind and solar) by 2025, and while the ADEME proposes a 100 per cent renewable scenario for 2050, this paper proposes a brief analysis of the replacement of nuclear energy by solar photovoltaic energy. It presents and discusses some characteristics of photovoltaic production: production level during a typical day for each month (a noticeable lower production in December), evolution of monthly production during a year, evolution of the rate between nuclear and photovoltaic production. A cost assessment is then proposed for energy storage and for energy production, and a minimum cost of replacement of nuclear by photovoltaic is assessed. The seasonal effect is outlined, as well as the latitude effect. Finally, the authors outline the huge cost of such a replacement, and consider that public support to new photovoltaic installations without an at least daily storage mean should be cancelled

  13. Fluorescent Lamp Replacement Study

    Science.gov (United States)

    2017-07-01

    not be cited for purposes of advertisement. DISPOSITION INSTRUCTIONS: Destroy this document when no longer needed. Do not return to the... recycling , and can be disposed safely in a landfill. (2) LEDs offer reduced maintenance costs and fewer bulb replacements, significantly reducing... recycling . Several fixtures, ballasts and energy efficient fluorescent bulbs that were determined to be in pristine condition were returned to ATC

  14. Replacing Recipe Realism

    OpenAIRE

    Saatsi, J

    2017-01-01

    Many realist writings exemplify the spirit of ‘recipe realism’. Here I characterise recipe realism, challenge it, and propose replacing it with ‘exemplar realism’. This alternative understanding of realism is more piecemeal, robust, and better in tune with scientists’ own attitude towards their best theories, and thus to be preferred.

  15. Glaucoma after corneal replacement.

    Science.gov (United States)

    Baltaziak, Monika; Chew, Hall F; Podbielski, Dominik W; Ahmed, Iqbal Ike K

    Glaucoma is a well-known complication after corneal transplantation surgery. Traditional corneal transplantation surgery, specifically penetrating keratoplasty, has been slowly replaced by the advent of new corneal transplantation procedures: primarily lamellar keratoplasties. There has also been an emergence of keratoprosthesis implants for eyes that are high risk of failure with penetrating keratoplasty. Consequently, there are different rates of glaucoma, pathogenesis, and potential treatment in the form of medical, laser, or surgical therapy. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.; Horlock, K.

    2001-01-01

    The contract for the design, construction and commissioning of the Replacement Research Reactor was signed in July 2000. This was followed by the completion of the detailed design and an application for a construction licence was made in May 2001. This paper will describe the main elements of the design and their relation to the proposed applications of the reactor. The future stages in the project leading to full operation are also described

  17. Apparatus for fuel replacement

    International Nuclear Information System (INIS)

    Imada, Takahiko.

    1974-01-01

    Object: To support a telescope mast such that no deforming load is applied to it even during massive vibration, it is held fixed at the time of fuel replacement to permit satisfactory remote control operation by automatic operation. Structure: The body of the fuel replacement apparatus is provided with telescope mast fixing means comprising a slide base supported for reciprocal movement with respect to a telescope mast, an operating arm pivoted at the slide base, a wrist member mounted on the free end of the operating arm and an engagement member for restricting the slide base and operating arm at the time of loading and unloading the fuel. When loading and unloading the fuel, the slide base and operating arm are restrained by the engagement member to reliably restrict the vibration of the telescope mast. When the fuel replacement apparatus is moved, the means provided on the operating arm is smoothly displaced to follow the swing (vibration) of the telescope mast to prevent the deforming load from being applied to the support portion or other areas. The wrist member supports the telescope mast such that it can be rotated while restraining movement in the axial direction, and it is provided with revolution drive means for rotating the telescope mast under remote control. (Kamimura, M.)

  18. Toleration, Synthesis or Replacement?

    DEFF Research Database (Denmark)

    Holtermann, Jakob v. H.; Madsen, Mikael Rask

    2016-01-01

    , in order to answer is not yet another partisan suggestion, but rather an attempt at making intelligible both the oppositions and the possibilities of synthesis between normative and empirical approaches to law. Based on our assessment and rational reconstruction of current arguments and positions, we...... therefore outline a taxonomy consisting of the following three basic, ideal-types in terms of the epistemological understanding of the interface of law and empirical studies: toleration, synthesis and replacement. This tripartite model proves useful with a view to teasing out and better articulating...

  19. Upgrade, rebuild or replace?

    International Nuclear Information System (INIS)

    Forbes, C.A.

    1990-01-01

    Ageing reactor simulators present some tough decisions for utility managers. Although most utilities have chosen the cheaper, upgrading solution as the best compromise between costs and outage length, some US utilities have found that for them, replacement represents the best option. Simulators may be less than ten years old, but they have limited instructor systems, older low fidelity models that cannot reproduce important training scenarios, and out of date, difficult to maintain computers that do not permit much expansion of the models anyway. Perhaps worse than this is the possibility that the simulator may no longer be a faithful reproduction of the referenced plant, or have poor (or non-existent) documentation. (author)

  20. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  1. Cadmium plating replacements

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, M.J.; Groshart, E.C.

    1995-03-01

    The Boeing Company has been searching for replacements to cadmium plate. Two alloy plating systems seem close to meeting the needs of a cadmium replacement. The two alloys, zinc-nickel and tin-zinc are from alloy plating baths; both baths are neutral pH. The alloys meet the requirements for salt fog corrosion resistance, and both alloys excel as a paint base. Currently, tests are being performed on standard fasteners to compare zinc-nickel and tin-zinc on threaded hardware where cadmium is heavily used. The Hydrogen embrittlement propensity of the zinc-nickel bath has been tested, and just beginning for the tin-zinc bath. Another area of interest is the electrical properties on aluminum for tin-zinc and will be discussed. The zinc-nickel alloy plating bath is in production in Boeing Commercial Airplane Group for non-critical low strength steels. The outlook is promising that these two coatings will help The Boeing Company significantly reduce its dependence on cadmium plating.

  2. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. A 'personnel office' stamped photocopy of the old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), between 8:30 and 12:30, in order to fill a 'fiche individuelle' form (in black ink only), which has to be personally signed by themselves and another separately signed by members of their family, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format (signed on the back) The French card in their possession an A4 photocopy of the same Fre...

  3. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  4. Replace with abstract title

    Science.gov (United States)

    Coho, Aleksander; Kioussis, Nicholas

    2003-03-01

    We use the semidiscrete variational generelized Peierls-Nabarro model to study the effect of Cu alloying on the dislocation properties of Al. First-principles density functional theory (DFT) is used to calculate the generalized-stacking-fault (GSF) energy surface when a plane, on which one in four Al atoms has been replaced with a Cu atom, slips over a pure Al plane. Various dislocation core properties (core width, energy, Peierls stress, dissociation tendency) are investigated and compared with the pure Al case. Cu alloying lowers the intrinsic stacking fault (ISF) energy, which makes dislocations more likely to dissociate into partials. We also try to understand the lowering of ISF energy in terms of Al-Cu and Al-Al bond formation and braking during shearing along the direction. From the above we draw conclusions about the effects of Cu alloying on the mechanical properties of Al.

  5. Iron replacement therapy

    DEFF Research Database (Denmark)

    Nielsen, Ole Haagen; Coskun, Mehmet; Weiss, Günter

    2016-01-01

    PURPOSE OF REVIEW: Approximately, one-third of the world's population suffers from anemia, and at least half of these cases are because of iron deficiency. With the introduction of new intravenous iron preparations over the last decade, uncertainty has arisen when these compounds should...... be administered and under which circumstances oral therapy is still an appropriate and effective treatment. RECENT FINDINGS: Numerous guidelines are available, but none go into detail about therapeutic start and end points or how iron-deficiency anemia should be best treated depending on the underlying cause...... of iron deficiency or in regard to concomitant underlying or additional diseases. SUMMARY: The study points to major issues to be considered in revisions of future guidelines for the true optimal iron replacement therapy, including how to assess the need for treatment, when to start and when to stop...

  6. Total ankle joint replacement.

    Science.gov (United States)

    2016-02-01

    Ankle arthritis results in a stiff and painful ankle and can be a major cause of disability. For people with end-stage ankle arthritis, arthrodesis (ankle fusion) is effective at reducing pain in the shorter term, but results in a fixed joint, and over time the loss of mobility places stress on other joints in the foot that may lead to arthritis, pain and dysfunction. Another option is to perform a total ankle joint replacement, with the aim of giving the patient a mobile and pain-free ankle. In this article we review the efficacy of this procedure, including how it compares to ankle arthrodesis, and consider the indications and complications. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  7. Antenna Controller Replacement Software

    Science.gov (United States)

    Chao, Roger Y.; Morgan, Scott C.; Strain, Martha M.; Rockwell, Stephen T.; Shimizu, Kenneth J.; Tehrani, Barzia J.; Kwok, Jaclyn H.; Tuazon-Wong, Michelle; Valtier, Henry; Nalbandi, Reza; hide

    2010-01-01

    The Antenna Controller Replacement (ACR) software accurately points and monitors the Deep Space Network (DSN) 70-m and 34-m high-efficiency (HEF) ground-based antennas that are used to track primarily spacecraft and, periodically, celestial targets. To track a spacecraft, or other targets, the antenna must be accurately pointed at the spacecraft, which can be very far away with very weak signals. ACR s conical scanning capability collects the signal in a circular pattern around the target, calculates the location of the strongest signal, and adjusts the antenna pointing to point directly at the spacecraft. A real-time, closed-loop servo control algorithm performed every 0.02 second allows accurate positioning of the antenna in order to track these distant spacecraft. Additionally, this advanced servo control algorithm provides better antenna pointing performance in windy conditions. The ACR software provides high-level commands that provide a very easy user interface for the DSN operator. The operator only needs to enter two commands to start the antenna and subreflector, and Master Equatorial tracking. The most accurate antenna pointing is accomplished by aligning the antenna to the Master Equatorial, which because of its small size and sheltered location, has the most stable pointing. The antenna has hundreds of digital and analog monitor points. The ACR software provides compact displays to summarize the status of the antenna, subreflector, and the Master Equatorial. The ACR software has two major functions. First, it performs all of the steps required to accurately point the antenna (and subreflector and Master Equatorial) at the spacecraft (or celestial target). This involves controlling the antenna/ subreflector/Master-Equatorial hardware, initiating and monitoring the correct sequence of operations, calculating the position of the spacecraft relative to the antenna, executing the real-time servo control algorithm to maintain the correct position, and

  8. Hip Replacement: MedlinePlus Health Topic

    Science.gov (United States)

    ... invasive hip replacement (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hip Replacement updates ... replacement - precautions Minimally invasive hip replacement Related Health Topics Hip Injuries and Disorders National Institutes of Health ...

  9. Educating My Replacement

    Science.gov (United States)

    Tarter, Jill

    , in partnership with the dedicated teachers out there, I think I can help promote the critical thinking skills and scientific literacy of the next generation of voters. Hopefully, I can also help train my replacement to be a better scientist, capable of seizing all the opportunities generated by advances in technology and our improved understanding of the universe to craft search strategies with greater probability of success than those I have initiated.

  10. Transforming Normal Programs by Replacement

    NARCIS (Netherlands)

    Bossi, Annalisa; Pettorossi, A.; Cocco, Nicoletta; Etalle, Sandro

    1992-01-01

    The replacement transformation operation, already defined in [28], is studied wrt normal programs. We give applicability conditions able to ensure the correctness of the operation wrt Fitting's and Kunen's semantics. We show how replacement can mimic other transformation operations such as thinning,

  11. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy...... operations were completed as mini-sternotomies, 4 died later of noncardiac causes. The aortic cross-clamp and perfusion times were significantly different across all groups (P replacement...... is an excellent operation in selected patients, but its true advantages over conventional aortic valve replacement (other than a smaller scar) await evaluation by means of randomized clinical trial. The "extended mini-aortic valve replacement" operation, on the other hand, is a risky procedure that should...

  12. Patients Unicondylar Knee Replacement vs. Total Knee Replacement

    OpenAIRE

    Hedra Eskander

    2017-01-01

    The aim of this review article is to analyse the clinical effectiveness of total knee replacement (TKR) compared to unicondylar knee replacement (UKR) on patients. In terms of survival rates, revision rates and postoperative complications. The keywords used were: knee arthroplasty. Nearly three thousand articles were found on 25 August 2016. Of those, only twenty-five were selected and reviewed because they were strictly focused on the topic of this article. Compared with those who have TKR, ...

  13. Nuclear reactor fuel replacement system

    International Nuclear Information System (INIS)

    Kayano, Hiroyuki; Joge, Toshio.

    1976-01-01

    Object: To permit the direction in which a fuel replacement unit is moving to be monitored by the operator. Structure: When a fuel replacement unit approaches an intermediate goal position preset in the path of movement, renewal of data display on a goal position indicator is made every time the goal position is changed. With this renewal, the prevailing direction of movement of the fuel replacement unit can be monitored by the operator. When the control of movement is initiated, the co-ordinates of the intermediate goal point A are displayed on a goal position indicator. When the replacement unit reaches point A, the co-ordinates of the next intermediate point B are displayed, and upon reaching point B the co-ordinates of the (last) goal point C are displayed. (Nakamura, S.)

  14. Slab replacement maturity guidelines : [summary].

    Science.gov (United States)

    2014-04-01

    Concrete sets in hours at moderate temperatures, : but the bonds that make concrete strong continue : to mature over days to years. However, for : replacement concrete slabs on highways, it is : crucial that concrete develop enough strength : within ...

  15. Prolonged Intermittent Renal Replacement Therapy.

    Science.gov (United States)

    Edrees, Fahad; Li, Tingting; Vijayan, Anitha

    2016-05-01

    Prolonged intermittent renal replacement therapy (PIRRT) is becoming an increasingly popular alternative to continuous renal replacement therapy in critically ill patients with acute kidney injury. There are significant practice variations in the provision of PIRRT across institutions, with respect to prescription, technology, and delivery of therapy. Clinical trials have generally demonstrated that PIRRT is non-inferior to continuous renal replacement therapy regarding patient outcomes. PIRRT offers cost-effective renal replacement therapy along with other advantages such as early patient mobilization and decreased nursing time. However, due to lack of standardization of the procedure, PIRRT still poses significant challenges, especially pertaining to appropriate drug dosing. Future guidelines and clinical trials should work toward developing consensus definitions for PIRRT and ensure optimal delivery of therapy. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  16. Replacement of sub-systems

    International Nuclear Information System (INIS)

    Rosen, S.E.

    1992-01-01

    This paper describes a number of quality aspects related to replacement of important systems or components in a nuclear power station. Reference is given to the steam generator replacement and power uprating performed at Ringhals 2 in Sweden in 1989. Since quality is a wide concept there has been put special emphasis in this paper to the important aspects that traditionally are not connected to quality. (author) 1 fig

  17. Feeder replacement tooling and processes

    International Nuclear Information System (INIS)

    Mallozzi, R.; Goslin, R.; Pink, D.; Askari, A.

    2008-01-01

    Primary heat transport system feeder integrity has become a concern at some CANDU nuclear plants as a result of thinning caused by flow accelerated corrosion (FAC). Feeder inspections are indicating that life-limiting wall thinning can occur in the region between the Grayloc hub weld and second elbow of some outlet feeders. In some cases it has become necessary to replace thinned sections of affected feeders to restore feeder integrity to planned end of life. Atomic Energy of Canada Limited (AECL) and Babcock and Wilcox Canada Ltd. (B and W) have developed a new capability for replacement of single feeders at any location on the reactor face without impacting or interrupting operation of neighbouring feeders. This new capability consists of deploying trained crews with specialized tools and procedures for feeder replacements during planned outages. As may be expected, performing single feeder replacement in the congested working environment of an operational CANDU reactor face involves overcoming many challenges with respect to access to feeders, available clearances for tooling, and tooling operation and performance. This paper describes some of the challenges encountered during single feeder replacements and actions being taken by AECL and B and W to promote continuous improvement of feeder replacement tooling and processes and ensure well-executed outages. (author)

  18. Prioritization methodology for chemical replacement

    Science.gov (United States)

    Cruit, Wendy; Goldberg, Ben; Schutzenhofer, Scott

    1995-01-01

    Since United States of America federal legislation has required ozone depleting chemicals (class 1 & 2) to be banned from production, The National Aeronautics and Space Administration (NASA) and industry have been required to find other chemicals and methods to replace these target chemicals. This project was initiated as a development of a prioritization methodology suitable for assessing and ranking existing processes for replacement 'urgency.' The methodology was produced in the form of a workbook (NASA Technical Paper 3421). The final workbook contains two tools, one for evaluation and one for prioritization. The two tools are interconnected in that they were developed from one central theme - chemical replacement due to imposed laws and regulations. This workbook provides matrices, detailed explanations of how to use them, and a detailed methodology for prioritization of replacement technology. The main objective is to provide a GUIDELINE to help direct the research for replacement technology. The approach for prioritization called for a system which would result in a numerical rating for the chemicals and processes being assessed. A Quality Function Deployment (QFD) technique was used in order to determine numerical values which would correspond to the concerns raised and their respective importance to the process. This workbook defines the approach and the application of the QFD matrix. This technique: (1) provides a standard database for technology that can be easily reviewed, and (2) provides a standard format for information when requesting resources for further research for chemical replacement technology. Originally, this workbook was to be used for Class 1 and Class 2 chemicals, but it was specifically designed to be flexible enough to be used for any chemical used in a process (if the chemical and/or process needs to be replaced). The methodology consists of comparison matrices (and the smaller comparison components) which allow replacement technology

  19. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  20. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  1. Joint replacement in Zambia: A review of Hip & Knee Replacement ...

    African Journals Online (AJOL)

    Methods: Data captured by the different variables entered into the Joint Register covering the pre-op, intra-op and post-op period of all total hip and knee replacement surgery done at the ZIOH from 1998 to 2010 was entered into a spreadsheet after verification with individual patient medical records. This was then imported ...

  2. HST Replacement Battery Initial Performance

    Science.gov (United States)

    Krol, Stan; Waldo, Greg; Hollandsworth, Roger

    2009-01-01

    The Hubble Space Telescope (HST) original Nickel-Hydrogen (NiH2) batteries were replaced during the Servicing Mission 4 (SM4) after 19 years and one month on orbit.The purpose of this presentation is to highlight the findings from the assessment of the initial sm4 replacement battery performance. The batteries are described, the 0 C capacity is reviewed, descriptions, charts and tables reviewing the State Of Charge (SOC) Performance, the Battery Voltage Performance, the battery impedance, the minimum voltage performance, the thermal performance, the battery current, and the battery system recharge ratio,

  3. Insurance for replacement power costs

    International Nuclear Information System (INIS)

    Cleaver, A.

    1980-01-01

    Although careful consideration is given to insurance against physical damage to plant and equipment, little thought is given to the costs that will be incurred in replacing the power that is lost while a relatively efficient system is out of action. The results of an investigation carried out for a generating authority with an installed capacity of about 3000 MW is given. Replacement power costs for different cases of severity of damage range from Pound1.17m per month for damage to central services taking out all four units. (author)

  4. Replacing fuel alignment in Germany

    International Nuclear Information System (INIS)

    Poetz, F.; Kalthoff, W.

    1991-01-01

    Up to the end of 1989 varying numbers of broken fuel alignment pins were detected in several German PWRs (80 broken pins in all). The distribution of these broken pins over the core cross-section was more or less random. The problem was due to the stress corrosion cracking of the pin material and was restricted to individual pins. It was concluded that all fuel alignment pins made of Inconel X-750 should be replaced. The development of a new pin, more resistant to intergranular stress corrosion, and the replacement technique are outlined. (author)

  5. Testing of Replacement Bag Material

    International Nuclear Information System (INIS)

    Laurinat, J.E.

    1998-01-01

    Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties

  6. Electrocatalysts Prepared by Galvanic Replacement

    Directory of Open Access Journals (Sweden)

    Athanasios Papaderakis

    2017-03-01

    Full Text Available Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases hydrogen evolution too, both oxygen levels and the pH must be optimized. The resulting bimetallic material can in principle have a Mnoble-rich shell and M-rich core (denoted as Mnoble(M leading to a possible decrease in noble metal loading and the modification of its properties by the underlying metal M. This paper reviews a number of bimetallic or ternary electrocatalytic materials prepared by galvanic replacement for fuel cell, electrolysis and electrosynthesis reactions. These include oxygen reduction, methanol, formic acid and ethanol oxidation, hydrogen evolution and oxidation, oxygen evolution, borohydride oxidation, and halide reduction. Methods for depositing the precursor metal M on the support material (electrodeposition, electroless deposition, photodeposition as well as the various options for the support are also reviewed.

  7. Testosterone replacement in male hypogonadism

    OpenAIRE

    Kalra, Sanjay; Agrawal, Navneet; Kumar, Satish; Sharma, Amit

    2010-01-01

    Sanjay Kalra1, Navneet Agrawal2, Satish Kumar3, Amit Sharma11Department of Endocrinology, Bharti Hospital, Karnal, India; 2Dept of Medicine, GR Medical College, Gwalior, India; 3Clinical Research, EXCEL Life Sciences, NOIDA, IndiaAbstract: This article contains a review of the clinical aspects of testosterone replacement in androgen deficiency of the aging male.Keywords: testosterone, supplementation, hypogonadism, ADAM

  8. 25 CFR 700.53 - Dwelling, replacement.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Dwelling, replacement. 700.53 Section 700.53 Indians THE... Policies and Instructions Definitions § 700.53 Dwelling, replacement. The term replacement dwelling means a dwelling selected by the head of a household as a replacement dwelling that meets the criteria of this...

  9. 24 CFR 880.602 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 880.602... Replacement reserve. (a) A replacement reserve must be established and maintained in an interest-bearing account to aid in funding extraordinary maintenance and repair and replacement of capital items. (1) Part...

  10. 24 CFR 891.405 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.405....405 Replacement reserve. (a) Establishment of reserve. The Owner shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance and repair and replacement of capital items...

  11. 24 CFR 891.855 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserves. 891.855... § 891.855 Replacement reserves. (a) The mixed-finance owner shall establish and maintain a replacement... the funds will be used to pay for capital replacement costs for the Section 202 or 811 supportive...

  12. A Bayesian perspective on some replacement strategies

    International Nuclear Information System (INIS)

    Mazzuchi, Thomas A.; Soyer, Refik

    1996-01-01

    In this paper we present a Bayesian decision theoretic approach for determining optimal replacement strategies. This approach enables us to formally incorporate, express, and update our uncertainty when determining optimal replacement strategies. We develop relevant expressions for both the block replacement protocol with minimal repair and the age replacement protocol and illustrate the use of our approach with real data

  13. Modifications to Replacement Costs System

    International Nuclear Information System (INIS)

    Godec, M.

    1989-01-01

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985

  14. Results of Austin Moore replacement.

    Directory of Open Access Journals (Sweden)

    Jadhav A

    1996-04-01

    Full Text Available Forty cases of Austin Moore Replacement done for transcervical fractures of the femur in patients were reviewed after a period of 12 to 48 months postoperatively (mean 26 mth. 30 cases (75% had mild to severe pain of non-infective origin, starting as early as 6 months postoperatively. This was irrespective of the make, size or position (varus/valgus of the prosthesis. Though the Aufranc and Sweet clinical scoring was satisfactory in 65% cases, radiological evidence of complications like sinking, protrusion, etc. were seen in majority of the cases. Calcar resorption was seen in 34 cases (85% as early as 4 months postoperatively. Results of THR and bipolar replacement done for transcervical fractures in recent literature show 85% pain-free cases at 5 years. We feel that Austin Moore Replacement should be reserved for patients more than 65 years of age and those who are less active or debilitated because of other factors, because of increased acetabular wear with time in the younger individual. This is corroborated by unsatisfactory results in patients less than 65 years of age (p < 0.05.

  15. The caudal septum replacement graft.

    Science.gov (United States)

    Foda, Hossam M T

    2008-01-01

    To describe a technique for reconstructing the lost tip support in cases involving caudal septal and premaxillary deficiencies. The study included 120 patients with aesthetic and functional nasal problems resulting from the loss of caudal septal and premaxillary support. An external rhinoplasty approach was performed to reconstruct the lost support using a cartilaginous caudal septum replacement graft and premaxillary augmentation with Mersilene mesh. The majority of cases (75%) involved revisions in patients who had previously undergone 1 or more nasal surgical procedures. A caudal septum replacement graft was combined with premaxillary augmentation in 93 patients (77.5%). The mean follow-up period was 3 years (range, 1-12 years). The technique succeeded in correcting the external nasal deformities in all patients and resulted in a significant improvement in breathing in 74 patients (86%) with preoperative nasal obstruction. There were no cases of infection, displacement, or extrusion. The caudal septum replacement graft proved to be very effective in restoring the lost tip support in patients with caudal septal deficiency. Combining the graft with premaxillary augmentation using Mersilene mesh helped increase support and stability over long-term follow-up.

  16. BWR control blade replacement strategies

    Energy Technology Data Exchange (ETDEWEB)

    Kennard, M W [Stoller Nuclear Fuel, NAC International, Pleasantville, NY (United States); Harbottle, J E [Stoller Nuclear Fuel, NAC International, Thornbury, Bristol (United Kingdom)

    2000-02-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B{sub 4}C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  17. BWR control blade replacement strategies

    International Nuclear Information System (INIS)

    Kennard, M.W.; Harbottle, J.E.

    2000-01-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B 4 C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  18. Gentilly 2 divider plate replacement

    International Nuclear Information System (INIS)

    Forest, J.; Klisel, E.; McClellan, G.; Schnelder, W.

    1995-01-01

    The steam generators at the Gentilly 2 Nuclear Plant in operation since 1983 were built with primary divider plates of a bolted panel configuration. During a routine outage inspection, it was noted that two bolts had dislodged from the divider and were located lying in the primary head. Subsequent inspections revealed erosion damage to a substantial number of divider plate bolts and to a lesser extent, to the divider plate itself. After further inspection and repair the units were returned to operation, however, it was determined that a permanent replacement of the primary divider plates was going to be necessary. After evaluation of various options, it was decided that the panel type dividers would be replaced with a single piece floating design. The divider itself was to be of a one piece all-welded arrangement to be constructed from individual panels to be brought in through the manways. In view of the strength limitations of the bolted attachment of the upper seat bar to the tubesheet, a new welded seat bar was provided. To counteract erosion concerns, the new divider is fitted with erosion resistant inserts or weld buildup and with improved sealing features in order to minimize leakage and erosion. At an advanced stage in the design and manufacture of the components, the issue of divider strength during LOCA conditions came into focus. Analysis was performed to determine the strength and/or failure characteristics of the divider to a variety of small and large LOCA conditions. The paper describes the diagnosis of the original divider plates and the design, manufacture, field mobilization, installation and subsequent operation of the replacement divider plates. (author)

  19. In Defense of Artificial Replacement.

    Science.gov (United States)

    Shiller, Derek

    2017-06-01

    If it is within our power to provide a significantly better world for future generations at a comparatively small cost to ourselves, we have a strong moral reason to do so. One way of providing a significantly better world may involve replacing our species with something better. It is plausible that in the not-too-distant future, we will be able to create artificially intelligent creatures with whatever physical and psychological traits we choose. Granted this assumption, it is argued that we should engineer our extinction so that our planet's resources can be devoted to making artificial creatures with better lives. © 2017 John Wiley & Sons Ltd.

  20. Hormone Replacement Therapy and Your Heart

    Science.gov (United States)

    Hormone replacement therapy and your heart Are you taking — or considering — hormone therapy to treat bothersome menopausal symptoms? Understand ... you. By Mayo Clinic Staff Long-term hormone replacement therapy used to be routinely prescribed for postmenopausal ...

  1. Skilled nursing facilities after joint replacement

    Science.gov (United States)

    ... care providers in the weeks before your joint replacement. They can advise you about whether going directly ... of many people who have had a joint replacement? Can they tell you how many? A good ...

  2. Risks of hip and knee replacement

    Science.gov (United States)

    ... is normal to lose blood during and after hip or knee replacement surgery. Some people need a ... clot form are higher during and soon after hip or knee replacement surgery. Sitting or lying down ...

  3. Fleet replacement modeling : final report, July 2009.

    Science.gov (United States)

    2009-07-01

    This project focused on two interrelated areas in equipment replacement modeling for fleets. The first area was research-oriented and addressed a fundamental assumption in engineering economic replacement modeling that all assets providing a similar ...

  4. Long-life slab replacement concrete : [summary].

    Science.gov (United States)

    2015-04-01

    Concrete slab replacement projects in Florida have demonstrated a high incidence of : replacement slab cracking. Causes of cracking have not been reliably determined. University of South Florida researchers : sought to identify the factors or : param...

  5. Long-life slab replacement concrete.

    Science.gov (United States)

    2015-03-01

    This research was initiated following reports of high incidence of cracking on FDOT concrete pavement replacement : slab projects. Field slabs were instrumented for data acquisition from high-early-strength concrete pavement : replacement slabs place...

  6. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Howden, G.F.

    1996-01-01

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  7. Permanent Quadriplegia Following Replacement of Voice Prosthesis.

    Science.gov (United States)

    Ozturk, Kayhan; Erdur, Omer; Kibar, Ertugrul

    2016-11-01

    The authors presented a patient with quadriplegia caused by cervical spine abscess following voice prosthesis replacement. The authors present the first reported permanent quadriplegia patient caused by voice prosthesis replacement. The authors wanted to emphasize that life-threatening complications may be faced during the replacement of voice prosthesis. Care should be taken during the replacement of voice prosthesis and if some problems have been faced during the procedure patients must be followed closely.

  8. 24 CFR 970.31 - Replacement units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement units. 970.31 Section... PUBLIC HOUSING PROGRAM-DEMOLITION OR DISPOSITION OF PUBLIC HOUSING PROJECTS § 970.31 Replacement units. Notwithstanding any other provision of law, replacement public housing units may be built on the original public...

  9. Diagenetic replacement of Micas by Carbonates

    NARCIS (Netherlands)

    Oele, E.

    1961-01-01

    In the Ordovician sandstones of the Cantabrian Mountains a replacement of the micas by carbonate minerals could be observed. The absence of metamorphic minerals suggests a diagenetic replacement. This is supported by the finding of the same type of replacement in some undisturbed Pliocene sediments

  10. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  11. 24 CFR 891.605 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.605... 8 Assistance § 891.605 Replacement reserve. (a) Establishment of reserve. The Borrower shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance, and repair and...

  12. 24 CFR 891.745 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.745... and Individuals-Section 162 Assistance § 891.745 Replacement reserve. The general requirements for the replacement reserve are provided in § 891.605. For projects funded under §§ 891.655 through 891.790, the...

  13. 24 CFR 572.125 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ...) Homeownership Program Requirements-Implementation Grants § 572.125 Replacement reserves. (a) Purpose. A single replacement reserve may be established for the homeownership program only if HUD determines it is necessary to... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Replacement reserves. 572.125...

  14. Molecular replacement then and now

    International Nuclear Information System (INIS)

    Scapin, Giovanna

    2013-01-01

    A brief overview, with examples, of the evolution of molecular-replacement methods and models over the past few years is presented. The ‘phase problem’ in crystallography results from the inability to directly measure the phases of individual diffracted X-ray waves. While intensities are directly measured during data collection, phases must be obtained by other means. Several phasing methods are available (MIR, SAR, MAD, SAD and MR) and they all rely on the premise that phase information can be obtained if the positions of marker atoms in the unknown crystal structure are known. This paper is dedicated to the most popular phasing method, molecular replacement (MR), and represents a personal overview of the development, use and requirements of the methodology. The first description of noncrystallographic symmetry as a tool for structure determination was explained by Rossmann and Blow [Rossmann & Blow (1962 ▶), Acta Cryst.15, 24–31]. The term ‘molecular replacement’ was introduced as the name of a book in which the early papers were collected and briefly reviewed [Rossmann (1972 ▶), The Molecular Replacement Method. New York: Gordon & Breach]. Several programs have evolved from the original concept to allow faster and more sophisticated searches, including six-dimensional searches and brute-force approaches. While careful selection of the resolution range for the search and the quality of the data will greatly influence the outcome, the correct choice of the search model is probably still the main criterion to guarantee success in solving a structure using MR. Two of the main parameters used to define the ‘best’ search model are sequence identity (25% or more) and structural similarity. Another parameter that may often be undervalued is the quality of the probe: there is clearly a relationship between the quality and the correctness of the chosen probe and its usefulness as a search model. Efforts should be made by all structural biologists to

  15. Controversies in hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    A. Baziad

    2001-09-01

    Full Text Available Deficiency of estrogen hormone will result in either long-term or short-term health problems which may reduce the quality of life. There are numerous methods by which the quality of female life can be achieved. Since the problems occuring are due to the deficiency of estrogen hormone, the appropriate method to tackle the problem is by administration of estrogen hormone. The administration of hormone replacement therapy (HRT with estrogen may eliminate climacteric complaints, prevent osteoporosis, coronary heart disease, dementia, and colon cancer. Although HRT has a great deal of advantage, its use is still low and may result in controversies. These controversies are due to fact that both doctor and patient still hold on to the old, outmoded views which are not supported by numerous studies. Currently, the use of HRT is not only based on experience, or temporary observation, but more on evidence based medicine. (Med J Indones 2001; 10: 182-6Keywords: controversies, HRT

  16. Tracheal replacement by autogenous aorta

    Directory of Open Access Journals (Sweden)

    Anoosh Farhad

    2009-06-01

    Full Text Available Abstract Background Tracheal defects may occur after trauma or prolonged intubation. Resection of tracheal tumors also poses a major challenge for substitution. In an effort to solve this problem, different techniques have been tried with little success. We report on a new animal model which showed acceptable results with fewer complications. Methods We replaced 5 cm of cervical trachea in 10 dogs with harvested infra-renal aorta and repaired the aortic defect with Dacron graft. Results Necropsy of the grafted aorta and anastomotic site revealed well healed anastomosis in all animals together with ciliated columnar epithelium coverage of grafted aorta and neovascularization of aortic wall. Conclusion Aortic graft is preferable to other substitutes because of less antigenicity, less vascularity, and no mucous secretions or peristalsis

  17. Tracheal replacement by autogenous aorta.

    Science.gov (United States)

    Anoosh, Farhad; Hodjati, Hossain; Dehghani, Seifollah; Tanideh, Nader; Kumar, Perikala V

    2009-06-09

    Tracheal defects may occur after trauma or prolonged intubation. Resection of tracheal tumors also poses a major challenge for substitution. In an effort to solve this problem, different techniques have been tried with little success. We report on a new animal model which showed acceptable results with fewer complications. We replaced 5 cm of cervical trachea in 10 dogs with harvested infra-renal aorta and repaired the aortic defect with Dacron graft. Necropsy of the grafted aorta and anastomotic site revealed well healed anastomosis in all animals together with ciliated columnar epithelium coverage of grafted aorta and neovascularization of aortic wall. Aortic graft is preferable to other substitutes because of less antigenicity, less vascularity, and no mucous secretions or peristalsis.

  18. Renal replacement therapy in Europe

    DEFF Research Database (Denmark)

    Pippias, Maria; Stel, Vianda S; Abad Diez, José Maria

    2015-01-01

    BACKGROUND: This article summarizes the 2012 European Renal Association-European Dialysis and Transplant Association Registry Annual Report (available at www.era-edta-reg.org) with a specific focus on older patients (defined as ≥65 years). METHODS: Data provided by 45 national or regional renal...... disease (ESRD) receiving renal replacement therapy (RRT) and renal transplantation rates for 2012 are presented. RESULTS: In 2012, the overall unadjusted incidence rate of patients with ESRD receiving RRT was 109.6 per million population (pmp) (n = 69 035), ranging from 219.9 pmp in Portugal to 24.2 pmp...... to 32% between countries. The overall renal transplantation rate in 2012 was 28.3 pmp (n = 15 673), with the highest rate seen in the Spanish region of Catalonia. The proportion of patients ≥65 years receiving a transplant ranged from 0 to 35%. Five-year adjusted survival for all RRT patients was 59...

  19. Computer simulation of replacement sequences in copper

    International Nuclear Information System (INIS)

    Schiffgens, J.O.; Schwartz, D.W.; Ariyasu, R.G.; Cascadden, S.E.

    1978-01-01

    Results of computer simulations of , , and replacement sequences in copper are presented, including displacement thresholds, focusing energies, energy losses per replacement, and replacement sequence lengths. These parameters are tabulated for six interatomic potentials and shown to vary in a systematic way with potential stiffness and range. Comparisons of results from calculations made with ADDES, a quasi-dynamical code, and COMENT, a dynamical code, show excellent agreement, demonstrating that the former can be calibrated and used satisfactorily in the analysis of low energy displacement cascades. Upper limits on , , and replacement sequences were found to be approximately 10, approximately 30, and approximately 14 replacements, respectively. (author)

  20. Cost justification of chiller replacement

    International Nuclear Information System (INIS)

    Baker, T.J.; Baumer, R.A.

    1993-01-01

    We often hear of products with paybacks that are too good to be true. Just a few weeks ago,a client received a recommendation from a national service company's local office. In the letter the company recommended that open-quotes due to the age and condition of the boiler ... that the school consider replacing the boiler... The cost for the new boiler can usually be recovered by lower fuel bills in 2 to 3 yearsclose quotes. This was for an installation in Southeast Texas where the boiler is only used 4 to 5 months per year. Analysis show the above claims to be nonsense. A new boiler would cost about $47,000 installed. Current total gas bills for the facility are $15,630 per year. They would have to shutoff the gas to the facility to have a three year payback. In fact, only two-thirds of the gas is used to heat the facility so we have only $10, 000 to write off against the new boiler. How much will the greater efficiency save? A 30% savings due to greater efficiency produces $3,000 per year in gas savings to offset the $47,000 cost, a 16 year payback. And much of the efficiency savings can be realized by adjusting the existing boiler. In another care a client wanted to investigate replacement of a twenty year old chiller plant with more efficient equipment. We investigated the project and determined that the payback would be greater than ten years. They did not operate the equipment during the summer and at less than 50% of capacity the balance of the year

  1. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  2. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    Harris, K.J.

    1999-01-01

    HIFAR, a 10 MW tank type DIDO Class reactor has operated at the Lucas Heights Science and Technology Centre for 43 years. HIFAR and the 10 kW Argonaut reactor 'Moata' which is in the Care and Maintenance phase of decommissioning are Australia's only nuclear reactors. The initial purpose for HIFAR was for materials testing to support a nuclear power program. Changing community attitude through the 1970's and a Government decision not to proceed with a planned nuclear power reactor resulted in a reduction of materials testing activities and a greater emphasis being placed on neutron beam research and the production of radioisotopes, particularly for medical purposes. HIFAR is not fully capable of satisfying the expected increase in demand for medical radiopharmaceuticals beyond the next 5 years and the radial configuration of the beam tubes severely restricts the scope and efficiency of neutron beam research. In 1997 the Australian Government decided that a replacement research reactor should be built by the Australian Nuclear Science and Technology Organisation at Lucas Heights subject to favourable results of an Environmental Impact Study. The Ei identified no reasons on the grounds of safety, health, hazard or risk to prevent construction on the preferred site and it was decided in May 1999 that there were no environmental reasons why construction of the facility should not proceed. In recent years ANSTO has been reviewing the operation of HIFAR and observing international developments in reactor technology. Limitations in the flexibility and efficiency achievable in operation of a tank type reactor and the higher intrinsic safety sought in fundamental design resulted in an early decision that the replacement reactor must be a pool type having cleaner and higher intensity tangential neutron beams of wider energy range than those available from HIFAR. ANSTO has chosen to use it's own resources supported by specialised external knowledge and experience to identify

  3. Visual Image Sensor Organ Replacement

    Science.gov (United States)

    Maluf, David A.

    2014-01-01

    This innovation is a system that augments human vision through a technique called "Sensing Super-position" using a Visual Instrument Sensory Organ Replacement (VISOR) device. The VISOR device translates visual and other sensors (i.e., thermal) into sounds to enable very difficult sensing tasks. Three-dimensional spatial brightness and multi-spectral maps of a sensed image are processed using real-time image processing techniques (e.g. histogram normalization) and transformed into a two-dimensional map of an audio signal as a function of frequency and time. Because the human hearing system is capable of learning to process and interpret extremely complicated and rapidly changing auditory patterns, the translation of images into sounds reduces the risk of accidentally filtering out important clues. The VISOR device was developed to augment the current state-of-the-art head-mounted (helmet) display systems. It provides the ability to sense beyond the human visible light range, to increase human sensing resolution, to use wider angle visual perception, and to improve the ability to sense distances. It also allows compensation for movement by the human or changes in the scene being viewed.

  4. Gene replacement in Penicillium roqueforti.

    Science.gov (United States)

    Goarin, Anne; Silar, Philippe; Malagnac, Fabienne

    2015-05-01

    Most cheese-making filamentous fungi lack suitable molecular tools to improve their biotechnology potential. Penicillium roqueforti, a species of high industrial importance, would benefit from functional data yielded by molecular genetic approaches. This work provides the first example of gene replacement by homologous recombination in P. roqueforti, demonstrating that knockout experiments can be performed in this fungus. To do so, we improved the existing transformation method to integrate transgenes into P. roqueforti genome. In the meantime, we cloned the PrNiaD gene, which encodes a NADPH-dependent nitrate reductase that reduces nitrate to nitrite. Then, we performed a deletion of the PrNiaD gene from P. roqueforti strain AGO. The ΔPrNiaD mutant strain is more resistant to chlorate-containing medium than the wild-type strain, but did not grow on nitrate-containing medium. Because genomic data are now available, we believe that generating selective deletions of candidate genes will be a key step to open the way for a comprehensive exploration of gene function in P. roqueforti.

  5. Opportunistic replacement of fusion power system parts

    International Nuclear Information System (INIS)

    Day, J.A.; George, L.L.

    1981-01-01

    This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits

  6. Aortic valve replacement in octogenarians

    Directory of Open Access Journals (Sweden)

    Dark John H

    2007-07-01

    Full Text Available Abstract Background and Aims As our population ages and life expectancy increases the number of people aged over 80 and more referred for cardiac surgery is growing. This study sought to identify the outcome of aortic valve replacement (AVR in octogenarians. Methods 68 patients aged 80 years or more underwent AVR at the Freeman Hospital, between April 2001 and April 2004. A retrospective review of the notes and outcomes from the patients' GP and the NHS strategic tracking service was performed. 54% (37 underwent isolated AVR whilst 46% (31 underwent combined AVR and CABG. Results Follow up was 100% complete. The mean age was 83.1 ± s.d. 2.9 years, a mean gradient of 83 ± s.d. 31 mmHg and mean AVA of 0.56 cm2. The mean additive EuroSCORE was 8.6 ± s.d. 1.2, the logistic EuroSCORE mean 12.0 ± s.d. 5.9. In hospital 30 day mortality was 13 %. Survival was 80% at 1 year and 78% at 2 years. Median follow up was for 712 days. Stepwise logistic regression identified chronic obstructive airways disease as an independent predictor of mortality (p Conclusion Our study demonstrates that the operative mortality for AVR in the over eighties is good, whilst the mid to long term outcome is excellent There is a very low attrition rate with those undergoing the procedure living as long than their age matched population. This study confirms AVR is a safe, acceptable treatment for octogenarians with excellent mid term outcomes.

  7. Menopause and hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    Ali Baziad

    2001-12-01

    Full Text Available The global population in the 21st century has reached 6.2 billion people, by the year 2025 it is to be around 8.3-8.5 billion, and will increase further. Elderly people are expected to grow rapidly than other groups. The fastest increase in the elderly population will take place in Asia. Life expectancy is increasing steadily throughout developed and developing countries. For many  menopausal women, increased life expectancy will accompanied by many health problems. The consequences of estrogen deficiency are the menopausal symptoms. The treatment of menopause related complaints and diseases became an  important socioeconomic and medical issue. Long term symptoms, such as the increase in osteoporosis fractures, cardio and cerebrovascular disesses and dementia, created a large financial burden on individuals and society. All these health problems can be lreated or prevented by hormone replacement therapy (HRT. Natural HRT is usually prefened. Synthetic  estrogen in oral contraceptives (oc are not recommended for HRT. Many contra-indications for oc, but now it is widely usedfor HRT. The main reasons for discontinuing HRT are unwanted bleeding, fear of cancer, and negative side effects. Until now there are sill debates about the rebrtonship between HRT and the incidence of breast cancer. Many data showed that there were no clear relationship between the use of HRT and breast cancer. ThereÎore, nwny experts advocate the use of HRTfrom the first sign of climacteric complaints until death. (Med J Indones 2001;10: 242-51Keywords: estrogen deficiency, climacteric phases, tibolone.

  8. Replacing Fortran Namelists with JSON

    Science.gov (United States)

    Robinson, T. E., Jr.

    2017-12-01

    Maintaining a log of input parameters for a climate model is very important to understanding potential causes for answer changes during the development stages. Additionally, since modern Fortran is now interoperable with C, a more modern approach to software infrastructure to include code written in C is necessary. Merging these two separate facets of climate modeling requires a quality control for monitoring changes to input parameters and model defaults that can work with both Fortran and C. JSON will soon replace namelists as the preferred key/value pair input in the GFDL model. By adding a JSON parser written in C into the model, the input can be used by all functions and subroutines in the model, errors can be handled by the model instead of by the internal namelist parser, and the values can be output into a single file that is easily parsable by readily available tools. Input JSON files can handle all of the functionality of a namelist while being portable between C and Fortran. Fortran wrappers using unlimited polymorphism are crucial to allow for simple and compact code which avoids the need for many subroutines contained in an interface. Errors can be handled with more detail by providing information about location of syntax errors or typos. The output JSON provides a ground truth for values that the model actually uses by providing not only the values loaded through the input JSON, but also any default values that were not included. This kind of quality control on model input is crucial for maintaining reproducibility and understanding any answer changes resulting from changes in the input.

  9. 30 CFR 57.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 57.19122 Section 57.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 57.19122 Replacement parts. Parts used to repair hoists shall have properties...

  10. Transcatheter Aortic Valve Replacement in Europe

    DEFF Research Database (Denmark)

    Mylotte, Darren; Osnabrugge, Ruben L J; Windecker, Stephan

    2013-01-01

    The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy.......The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy....

  11. 30 CFR 56.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 56.19122 Section 56.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 56.19122 Replacement parts. Parts used to repair hoists shall have properties...

  12. An abstract machine for module replacement

    OpenAIRE

    Walton, Chris; Krl, Dilsun; Gilmore, Stephen

    1998-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement from the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection.

  13. Temelin NPP - IandC replacement

    International Nuclear Information System (INIS)

    Spalenka, I.

    1997-01-01

    The original instrumentation and control system of the Temelin nuclear power plant is being upgraded and replaced by a modern Westinghouse-supplied system which meets the requirements imposed on current nuclear power plant designs. The history and purpose of the IandC system replacement is given, and the design of the new system is described in some detail. (A.K.)

  14. Replacement Value of fermented millet ( Pennisetum americanum ...

    African Journals Online (AJOL)

    The replacement value of fermented millet for maize in the diets of Clarias gariepinus fingerlings reared in a recirculation system was determined. Five isonitrogenous diets were formulated to contain graded levels of fermented millet meal replacing 0, 20, 40, 60 and 80% of maize and fed to triplicate groups of fingerlings ...

  15. 30 CFR 823.14 - Soil replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Soil replacement. 823.14 Section 823.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-OPERATIONS ON PRIME FARMLAND § 823.14 Soil replacement. (a) Soil...

  16. A useful framework for optimal replacement models

    International Nuclear Information System (INIS)

    Aven, Terje; Dekker, Rommert

    1997-01-01

    In this note we present a general framework for optimization of replacement times. It covers a number of models, including various age and block replacement models, and allows a uniform analysis for all these models. A relation to the marginal cost concept is described

  17. 7 CFR 1944.659 - Replacement housing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Replacement housing. 1944.659 Section 1944.659 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) HOUSING Housing Preservation Grants § 1944.659 Replacement housing...

  18. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert

    Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism

    Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves

  19. Pipe replacement in a water supply network: coordinated versus uncoordinated replacement and budget effects

    NARCIS (Netherlands)

    Dijk, van D.; Hendrix, E.M.T.

    2016-01-01

    Operators of underground water supply networks are challenged with pipe replacement
    decisions, because pipes are subject to increased failure rates as they age and financial resources
    are often limited.We study the optimal replacement time and optimal number of pipe replacements
    such

  20. Design verification for reactor head replacement

    International Nuclear Information System (INIS)

    Dwivedy, K.K.; Whitt, M.S.; Lee, R.

    2005-01-01

    This paper outlines the challenges of design verification for reactor head replacement for PWR plants and the program for qualification from the prospective of the utility design engineering group. This paper is based on the experience with the design confirmation of four reactor head replacements for two plants, and their interfacing components, parts, appurtenances, and support structures. The reactor head replacement falls under the jurisdiction of the applicable edition of the ASME Section XI code, with particular reference to repair/replacement activities. Under any repair/replacement activities, demands may be encountered in the development of program and plan for replacement due to the vintage of the original design/construction Code and the design reports governing the component qualifications. Because of the obvious importance of the reactor vessel, these challenges take on an added significance. Additional complexities are introduced to the project, when the replacement components are fabricated by vendors different from the original vendor. Specific attention is needed with respect to compatibility with the original design and construction of the part and interfacing components. The program for reactor head replacement requires evaluation of welding procedures, applicable examination, test, and acceptance criteria for material, welds, and the components. Also, the design needs to take into consideration the life of the replacement components with respect to the extended period of operation of the plant after license renewal and other plant improvements. Thus, the verification of acceptability of reactor head replacement provides challenges for development and maintenance of a program and plan, design specification, design report, manufacturer's data report and material certification, and a report of reconciliation. The technical need may also be compounded by other challenges such as widely scattered global activities and organizational barriers, which

  1. Delirium After Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Giuseffi, Jennifer L; Borges, Nyal E; Boehm, Leanne M; Wang, Li; McPherson, John A; Fredi, Joseph L; Ahmad, Rashid M; Ely, E Wesley; Pandharipande, Pratik P

    2017-07-01

    Postoperative delirium is associated with increased mortality. Patients undergoing transcatheter aortic valve replacement are at risk for delirium because of comorbid conditions. To compare the incidence, odds, and mortality implications of delirium between patients undergoing transcatheter replacement and patients undergoing surgical replacement. The Richmond Agitation-Sedation Scale and the Confusion Assessment Method for the Intensive Care Unit were used to assess arousal level and delirium prospectively in all patients with severe aortic stenosis who had transcatheter or surgical aortic valve replacement at an academic medical center. Multivariable logistic regression was used to determine the relationship between procedure type and occurrence of delirium. Cox regression was used to assess the association between postoperative delirium and 6-month mortality. A total of 105 patients had transcatheter replacement and 121 had surgical replacement. Patients in the transcatheter group were older (median age, 81 vs 68 years; P replacement. Delirium is less likely to develop in the transcatheter group but is associated with higher mortality in both groups. ©2017 American Association of Critical-Care Nurses.

  2. Optimal composition of fluid-replacement beverages.

    Science.gov (United States)

    Baker, Lindsay B; Jeukendrup, Asker E

    2014-04-01

    The objective of this article is to provide a review of the fundamental aspects of body fluid balance and the physiological consequences of water imbalances, as well as discuss considerations for the optimal composition of a fluid replacement beverage across a broad range of applications. Early pioneering research involving fluid replacement in persons suffering from diarrheal disease and in military, occupational, and athlete populations incurring exercise- and/or heat-induced sweat losses has provided much of the insight regarding basic principles on beverage palatability, voluntary fluid intake, fluid absorption, and fluid retention. We review this work and also discuss more recent advances in the understanding of fluid replacement as it applies to various populations (military, athletes, occupational, men, women, children, and older adults) and situations (pathophysiological factors, spaceflight, bed rest, long plane flights, heat stress, altitude/cold exposure, and recreational exercise). We discuss how beverage carbohydrate and electrolytes impact fluid replacement. We also discuss nutrients and compounds that are often included in fluid-replacement beverages to augment physiological functions unrelated to hydration, such as the provision of energy. The optimal composition of a fluid-replacement beverage depends upon the source of the fluid loss, whether from sweat, urine, respiration, or diarrhea/vomiting. It is also apparent that the optimal fluid-replacement beverage is one that is customized according to specific physiological needs, environmental conditions, desired benefits, and individual characteristics and taste preferences.

  3. Optimum body size of Holstein replacement heifers.

    Science.gov (United States)

    Hoffman, P C

    1997-03-01

    Criteria that define optimum body size of replacement heifers are required by commercial dairy producers to evaluate replacement heifer management programs. Historically recommended body size criteria have been based on live BW measurements. Numerous research studies have observed a positive relationship between BW at first calving and first lactation milk yield, which has served as the impetus for using live BW to define body size of replacement heifers. Live BW is, however, not the only available measurement to define body size. Skeletal measurements such as wither height, length, and pelvic area have been demonstrated to be related to first lactation performance and (or) dystocia. Live BW measurements also do not define differences in body composition. Differences in body composition of replacement heifers at first calving are also related to key performance variables. An updated research data base is available for the modern Holstein genotype to incorporate measures of skeletal growth and body composition with BW when defining body size. These research projects also lend insight into the relative importance of measurements that define body size of replacement heifers. Incorporation of these measurements from current research into present BW recommendations should aid commercial dairy producers to better define replacement heifer growth and management practices. This article proposes enhancements in defining optimum body size and growth characteristics of Holstein replacement heifers.

  4. How to replace a reactor pressure vessel

    International Nuclear Information System (INIS)

    Huber, R.

    1996-01-01

    A potential life extending procedure for a nuclear reactor after, say, 40 years of service life, might in some circumstances be the replacement of the reactor pressure vessel. Neutron induced degradation of the vessel might make replacement by one of a different material composition desirable, for example. Although the replacement of heavy components, such as steam generators, has been possible for many years, the pressure vessel presents a much more demanding task if only because it is highly irradiated. Some preliminary feasibility studies by Siemens are reported for the two removal strategies that might be considered. These are removal of the entire pressure vessel in one piece and dismantling it into sections. (UK)

  5. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  6. Replacement Saltwell Pumping System Document Bibliography

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document bibliography is prepared to identify engineering documentation developed during the design of the Replacement Saltwell Pumping System. The bibliography includes all engineering supporting documents and correspondence prepared prior to the deployment of the system in the field. All documents referenced are available electronically through the Records Management Information System (RMIS). Major components of the Replacement Saltwell Pumping System include the Sundyne Canned Motor Pump, the Water Filter Skid, the Injection Water Skid and the Backflow Preventer Assembly. Drawing H-14-104498 provides an index of drawings (fabrication details, PandIDs, etc.) prepared to support development of the Replacement Saltwell Pumping System. Specific information pertaining to new equipment can be found in Certified Vendor Information (CVI) File 50124. This CVI file has been established specifically for new equipment associated with the Replacement Saltwell Pumping System

  7. The future of rapid bridge deck replacement.

    Science.gov (United States)

    2015-06-01

    Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose : inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction : techniques often use precast member...

  8. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  9. Assessing Window Replacement Options | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  10. Logistic Vehicle System Replacement Cost Estimate

    National Research Council Canada - National Science Library

    Stinson, Margaret

    1998-01-01

    The Logistics Vehicle System (LVS) was originally fielded from 1985-1989. Most of the LVS fleet will reach end-of-service life in 2005, therefore the goal of the Logistics Vehicle System Replacement (LVSR...

  11. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  12. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    2005-01-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  13. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  14. Machine replacement, Network Externalities and Investment Cycles

    OpenAIRE

    Juan Ruiz

    2003-01-01

    This paper presents a model where agents decide on the timing of replacement of ageing machines. The optimal replacement policy for an agent is influenced by other agents' decisions because the productivity of a particular vintage displays network externalities that set in with a lag. In equilibrium, agents follow innovation cycles with a frequency that is lower than optimal, so there is too much delay. One extreme case is the possibility of inefficient collapse: for some parameters there is ...

  15. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  16. Does Online Marketing Truly Replace Traditional Marketing?

    OpenAIRE

    Gunawan, Emilia Margareth

    2013-01-01

    This review explains the way how online marketing has been replacing traditional marketing in terms of marketing mix. This replacement might happen, because online marketing can give advantages, i.e., offering on-time delivery, increasing effectiveness of two way interactions between buyer and seller, and creating online communities (Szmigin, et al, 2005). The transition of atoms to bits format reflects that tangible products in traditional marketing is being digitalized. The marketing strate...

  17. Infective endocarditis following percutaneous pulmonary valve replacement

    DEFF Research Database (Denmark)

    Cheung, Gary; Vejlstrup, Niels; Ihlemann, Nikolaj

    2013-01-01

    Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult.......Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult....

  18. Essential Specification Elements for Heat Exchanger Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Bower, L.

    2015-07-01

    Performance upgrade and equipment degradation are the primary impetuses for a nuclear power plant to engage in the large capital cost project of heat exchanger replacement. Along with attention to these issues, consideration of heat exchanger Codes and Standards, material improvements, thermal redesign, and configuration are essential for developing User’s Design Specifications for successful replacement projects. The User’s Design Specification is the central document in procuring ASME heat exchangers. Properly stated objectives for the heat exchanger replacement are essential for obtaining the materials, configurations and thermal designs best suited for the nuclear power plant. Additionally, the code of construction required and the applied manufacturing standard (TEMA or HEI) affects how the heat exchanger may be designed or configured to meet the replacement goals. Knowledge of how Codes and Standards affect design and configuration details will aid in writing the User’s Design Specification. Joseph Oat Corporation has designed and fabricated many replacement heat exchangers for the nuclear power industry. These heat exchangers have been constructed per ASME Section III to various Code-Years or ASME Section VIII-1 to the current Code-Year also in accordance with TEMA and HEI. These heat exchangers have been a range of like-for-like replacement to complete thermal, material and configuration redesigns. Several examples of these heat exchangers with their Code, Standard and specification implications are presented. (Author.

  19. Strategic vehicle fleet management - the replacement problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2016-03-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the third one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Material and methods: The paper discusses ways of building replacement strategies for companies' fleets of vehicles. It means deciding for how long to exploit particular vehicles in a fleet (the fleet replacement problem - FR. The essence of this problem lies in the minimization of vehicle / fleet exploitation costs by balancing ownership and utilization costs and taking into account budget limitations. In the paper an original mathematical model (an optimization method allowing for the FR analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows that there exist optimal exploitation periods of particular vehicles in a fleet. However, combination of them gives a replacement plan for an entire fleet violating budget constraints. But it is possible to adjust individual age to replacement of particular vehicles to fulfill budget constraints without losing economical optimality of a developed replacement plan for an entire fleet. Conclusions: The paper is the last one of a series of three papers that the author dedicated to the strategic vehicle fleet management topic including the following managerial decision problems: MAKE-or-BUY, sizing / composition and replacement.

  20. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Wiechmann, K.

    1993-01-01

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.) [de

  1. A replaceable reflective film for solar concentrators

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  2. Engineering Development of the XM261 Multipurpose Submunition Warhead and the XM267 Submunition Training Warhead

    Science.gov (United States)

    1985-01-01

    C 41 i • 1 *- ( X: — a» «-» ** »o ** -- *o h X» O i a» —• o *J 3 O 41 • o • •-» E flj ...34 *- * • -’--’’’ -"- • - - i’ i • i’ i * i i - iin td mä • i • • • na >Mi*i^BiB*a***ftfc *. *. • ii ^^•^^^^Vf^^V •«’•»•* •"• ^•W^ WT.i« ii, i...c C 3 TD O <Ü (O c* C C*_l oooooooooooooooooo i-H O HOOH i-HOt—«OI-HOOOOOOO CO en oo en en oooocncocncocncncncncncncn OcnH

  3. Structural considerations in steam generator replacement

    International Nuclear Information System (INIS)

    Bertheau, S.R.; Gazda, P.A.

    1991-01-01

    Corrosion of the tubes and tube-support structures inside pressurized water reactor (PWR) steam generators has led many utilities to consider a replacement of the generators. Such a project is a major undertaking for a utility and must be well planned to ensure an efficient and cost-effective effort. This paper discusses various structural aspects of replacement options, such as total or partial generator replacement, along with their associated pipe cuts; major structural aspects associated with removal paths through the equipment hatch or through an opening in the containment wall, along with the related removal processes; onsite movement and storage of the generators; and the advantages and disadvantages of the removal alternatives. This paper addresses the major structural considerations associated with a steam generator replacement project. Other important considerations (e.g., licensing, radiological concerns, electrical requirements, facilities for management and onsite administrative activities, storage and fabrication activities, and offsite transportation) are not discussed in this paper, but should be carefully considered when undertaking a replacement project

  4. Hip or knee replacement - in the hospital after

    Science.gov (United States)

    Hip replacement surgery - after - self-care; Knee replacement surgery - after - self-care ... taking walks in the hallways with help. After knee replacement, some surgeons recommend using a continuous passive ...

  5. Three Steam Generator Replacement Projects in 1995

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S. A. joined their experience and efforts in the field of steam generator replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 1. Further projects will follow in 1996, i. e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  6. REPLACEMENT IN RABBIT HERDS: A REVIEW

    Directory of Open Access Journals (Sweden)

    Ibrahim F.M. Marai

    2010-08-01

    Full Text Available Doe rabbit's replacement constitutes the annual renewal rate of new breeders that must be incorporated into the production stock. Criterion for culling non-productive animals differs significantly among fryer production colonies, foundation stocks and a colony with continuous enzootic disease or continuous malnourishment. In commercial rabbit production, good management improves the health and productivity of the entire herd, by reducing the all-time high replacement rates and improving economic viability. In the present article, a comprehensive review of numerous experiences in the rabbit production field of different countries, was presented. Basic recommendations for professional breeders were highlighted, covering critical issues such as the need for continuously upgrading the health status of the colony, the positive effect of   genetic selection and the nutritional conditioning and special treatment of young does being groomed as future replacements.

  7. Optimal timing for intravascular administration set replacement.

    Science.gov (United States)

    Ullman, Amanda J; Cooke, Marie L; Gillies, Donna; Marsh, Nicole M; Daud, Azlina; McGrail, Matthew R; O'Riordan, Elizabeth; Rickard, Claire M

    2013-09-15

    The tubing (administration set) attached to both venous and arterial catheters may contribute to bacteraemia and other infections. The rate of infection may be increased or decreased by routine replacement of administration sets. This review was originally published in 2005 and was updated in 2012. The objective of this review was to identify any relationship between the frequency with which administration sets are replaced and rates of microbial colonization, infection and death. We searched The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library 2012, Issue 6), MEDLINE (1950 to June 2012), CINAHL (1982 to June 2012), EMBASE (1980 to June 2012), reference lists of identified trials and bibliographies of published reviews. The original search was performed in February 2004. We also contacted researchers in the field. We applied no language restriction. We included all randomized or controlled clinical trials on the frequency of venous or arterial catheter administration set replacement in hospitalized participants. Two review authors assessed all potentially relevant studies. We resolved disagreements between the two review authors by discussion with a third review author. We collected data for seven outcomes: catheter-related infection; infusate-related infection; infusate microbial colonization; catheter microbial colonization; all-cause bloodstream infection; mortality; and cost. We pooled results from studies that compared different frequencies of administration set replacement, for instance, we pooled studies that compared replacement ≥ every 96 hours versus every 72 hours with studies that compared replacement ≥ every 48 hours versus every 24 hours. We identified 26 studies for this updated review, 10 of which we excluded; six did not fulfil the inclusion criteria and four did not report usable data. We extracted data from the remaining 18 references (16 studies) with 5001 participants: study designs included neonate and adult

  8. Replacement of the JRR-3 computer system

    Energy Technology Data Exchange (ETDEWEB)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2000-10-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  9. Testosterone Replacement, Muscle Strength, and Physical Function

    Directory of Open Access Journals (Sweden)

    You-Seon Nam

    2018-05-01

    Full Text Available Muscle strength and physical function decrease in older men, as do testosterone levels. Nonetheless, the effects of testosterone replacement therapy on muscle strength and physical function remain inconclusive and equivocal. We conducted a rapid systematic review, the results of which showed that testosterone replacement does not affect muscle strength (measured by hand grip strength and leg muscle strength, although it may increase physical function (measured by the 6-minute walk test, Physical Activity Scale for the Elderly score, and other physical performance tests. However, most of the studies were conducted in the United States or Europe and did not include participants from Asian or other ethnic backgrounds; therefore, further studies are needed to evaluate the effects of testosterone replacement in a broader population.

  10. Dead pixel replacement in LWIR microgrid polarimeters.

    Science.gov (United States)

    Ratliff, Bradley M; Tyo, J Scott; Boger, James K; Black, Wiley T; Bowers, David L; Fetrow, Matthew P

    2007-06-11

    LWIR imaging arrays are often affected by nonresponsive pixels, or "dead pixels." These dead pixels can severely degrade the quality of imagery and often have to be replaced before subsequent image processing and display of the imagery data. For LWIR arrays that are integrated with arrays of micropolarizers, the problem of dead pixels is amplified. Conventional dead pixel replacement (DPR) strategies cannot be employed since neighboring pixels are of different polarizations. In this paper we present two DPR schemes. The first is a modified nearest-neighbor replacement method. The second is a method based on redundancy in the polarization measurements.We find that the redundancy-based DPR scheme provides an order-of-magnitude better performance for typical LWIR polarimetric data.

  11. Replacement of the JRR-3 computer system

    International Nuclear Information System (INIS)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu

    2000-01-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  12. Postmenopausal hormone replacement therapy--clinical implications

    DEFF Research Database (Denmark)

    Ravn, S H; Rosenberg, J; Bostofte, E

    1994-01-01

    The menopause is defined as cessation of menstruation, ending the fertile period. The hormonal changes are a decrease in progesterone level, followed by a marked decrease in estrogen production. Symptoms associated with these hormonal changes may advocate for hormonal replacement therapy....... This review is based on the English-language literature on the effect of estrogen therapy and estrogen plus progestin therapy on postmenopausal women. The advantages of hormone replacement therapy are regulation of dysfunctional uterine bleeding, relief of hot flushes, and prevention of atrophic changes...... in the urogenital tract. Women at risk of osteoporosis will benefit from hormone replacement therapy. The treatment should start as soon after menopause as possible and it is possible that it should be maintained for life. The treatment may be supplemented with extra calcium intake, vitamin D, and maybe calcitonin...

  13. Severe Heterotopic Ossification following Total Knee Replacement

    Directory of Open Access Journals (Sweden)

    Alexander L. Dodds

    2014-01-01

    Full Text Available Although the incidence of minor heterotopic ossification is probably higher than what is usually expected, severe heterotopic ossification (HO is an extremely rare event following total knee replacement surgery. We present the case of a 66-year-old woman who initially had achieved an excellent range of motion following bilateral uncemented rotating platform total knee replacement, before presenting with pain and loss of range of motion at 2 months after surgery. Severe HO was diagnosed on X-rays. Treatment consisted of nonoperative measures only, including physiotherapy with hydrotherapy and anti-inflammatories. She eventually regained her range of motion when seen at 8 months after operation. This case illustrates that nonoperative treatment without the use of radiotherapy or surgery can be used to safely resolve stiffness caused by HO after total knee replacement.

  14. Imaging techniques in transcatheter aortic valve replacement

    Directory of Open Access Journals (Sweden)

    Quaife RA

    2013-11-01

    Full Text Available Robert A Quaife, Jennifer Dorosz, John C Messenger, Ernesto E Salcedo Division of Cardiology, University of Colorado, Aurora, CO, USA Abstract: Calcific aortic stenosis is now understood as a complex valvular degenerative process sharing many risk factors with atherosclerosis. Once patients develop symptomatic calcific aortic stenosis, the only effective treatment is aortic valve replacement. In the past decade, transcatheter aortic valve replacement (TAVR has been developed as an alternative to surgery to treat severe calcific aortic stenosis. Cardiac imaging plays a pivotal role in the contemporary management of patients with calcific aortic stenosis, and particularly in patients being considered for TAVR, who demand detailed imaging of the aortic valve apparatus. In this review, we highlight the role of cardiac imaging for patient selection, procedural guidance, and evaluation of results of TAVR. Keywords: aortic stenosis, cardiovascular imaging, transcutaneous aortic valve replacement

  15. Renal replacement therapy in healthy adult horses.

    Science.gov (United States)

    Wong, D M; Witty, D; Alcott, C J; Sponseller, B A; Wang, C; Hepworth, K

    2013-01-01

    Renal replacement therapy (RRT) has been implemented extensively in people to facilitate recovery from acute renal failure (ARF). RRT has not been explored in horses, but might provide a further treatment option in horses with ARF. To investigate efficacy and safety of RRT in horses. Five healthy adult horses. A prospective study was performed on horses restrained in stocks and intravenously connected to a commercial RRT machine to allow continuous venovenous hemodiafiltration to be performed for 6 hours. The RRT machine was set at the following flow rates: blood flow rate 250 mL/min; dialysate rate 3,000 mL/h; prefilter replacement pump 3,000 mL/h; and postfilter replacement pump rate 2,000 mL/h. Balanced electrolyte solution was used as dialysate and replacement fluid. Heart rate, respiratory rate, body temperature, direct arterial blood pressure, urine output, and various clinicopathologic parameters were measured over the study period. Renal replacement therapy was successfully performed in horses, resulting in a mean creatinine clearance of 0.127 mL/kg/min (68.9 mL/min) and urea reduction ratio of 24%. No adverse effects were detected although a significant decrease in rectal temperature was observed (P ≤ .007). A significant increase in serum phosphorus (P ≤ .001) and decrease in BUN (P replacement therapy can safely and effectively be used in adult horses. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  16. Radiological evaluation of failed total hip replacement

    International Nuclear Information System (INIS)

    Raspa, V.; Aldrovandi, S.; Pompei, G.

    1988-01-01

    The retrospective study of 50 operated cases of cemented total hip replacement and a review of the literature enabled the authors to define the radiological features of the above-mentioned condition. These features include one or more of the following signs: calcar reabsorption, lacunar erosions, modified relatioships between the prosthesis components, sepsis and loosening, periarticular calcifications dislocation and fracture of prosthesis components. Careful evaluation of these radiological features is extremely important for both an early diagnosis of failed total hip replacement and the choice of an adequate surgical treatment

  17. Criteria for the replacement of restorations

    DEFF Research Database (Denmark)

    Wilson, Nairn; Lynch, Christopher; Brunton, Paul Brunton

    2016-01-01

    The replacement of a restoration is one of the most common procedures in dentistry. However, the criteria for such intervention, excluding catastrophic failure and persistent discomfort and pain, continue to be the subject of considerable debate. The decision-making process remains subjective...... on the part of the treating clinician, while the evidence base for refurbishment and repair rather than replacement for the management of defective and failing restorations continues to grow and strengthen. This article, prepared as an Academy of Operative Dentistry European Section consensus publication...

  18. Fuzzy logic application for extruders replacement problem

    Directory of Open Access Journals (Sweden)

    Edison Conde Perez dos Santos

    2017-03-01

    Full Text Available In a scenario of uncertainty and imprecision, before taking the replacement analysis, a manager needs to consider the uncertain reality of a problem. In this scenario, the fuzzy logic makes an excellent option. Therefore, it is necessary to make a decision based on the fuzzy model. This study is based on the comparison of two methodologies used in the problem of asset replacement. The study, thus, was based on a comparison between two extruders for polypropylene yarn bibliopegy, comparing mainly the costs involved in maintaining the equipment.

  19. Valve assembly having remotely replaceable bearings

    International Nuclear Information System (INIS)

    Johnson, E.R.; Tanner, D.E.

    1980-01-01

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings

  20. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Etalle, Sandro; Palamidessi, Catuscia

    1999-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  1. Rapid replacement/construction of bridges.

    Science.gov (United States)

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  2. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Bossi, Annalisa; Etalle, Sandro; Palamidessi, Catuscia

    2000-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  3. Prosthesis infections after orthopedic joint replacement

    DEFF Research Database (Denmark)

    Song, Zhijun; Borgwardt, Lotte; Høiby, Niels

    2013-01-01

    Prosthesis-related infection is a serious complication for patients after orthopedic joint replacement, which is currently difficult to treat with antibiotic therapy. Consequently, in most cases, removal of the infected prosthesis is the only solution to cure the infection. It is, therefore...

  4. Strategic Capital Budgeting : Asset Replacement Under Uncertainty

    NARCIS (Netherlands)

    Pawlina, G.; Kort, P.M.

    2001-01-01

    We consider a firm's decision to replace an existing production technology with a new, more cost-efficient one.Kulatilaka and Perotti [1998, Management Science] nd that, in a two-period model, increased product market uncertainty could encourage the firm to invest strategically in the new

  5. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  6. of surfactant replacement therapy at Johannesburg Hospital ...

    African Journals Online (AJOL)

    To assess the impact of surfactant replacement therapy (SRl) on the outcome of ... oxygen requirements) was compared with that of a historical control group of ... The use of SRT added to the total cost of treating a patient ventilated for HMD.

  7. vein thrombosis in elective hip replacement

    African Journals Online (AJOL)

    A consensus forum was convened to evaluate the economic considerations associated with prophylaxis against thrombo-embolic disease in patients undergoing hip replacement therapy in South Africa. This forum consists of orthopaedic surgeons, vascular surgeons and a statistician. Methods. The forum was instructed to ...

  8. Mechanical Aortic Valve Replacement in Octogenarian

    Directory of Open Access Journals (Sweden)

    Irfan Tasoglu

    2013-10-01

    Full Text Available Aim: This study analyzes the long-term outcomes of mechanical aortic valve replacement in octogenarian patients. Material and Method: A retrospective review was performed on 23 octogenarian patients who underwent mechanical aortic valve replacement. Hospital mortality, postoperative intensive care unit stay, hospital stay and long-term results was examined. Estimates of the cumulative event mortality rate were calculated by the Kaplan-Meier method. Results: The mean age of all patients was 82.9±2.3 years and most were men (65.22%. The median ejection fraction was 45%. 73.91% of patients were in New York Heart Association class III-IV. Thirteen patients (56.52% in this study underwent combined procedure, the remaining 10 (43.48% patients underwent isolated aortic valve replacement. The most common valve size was 23 mm. The mean intensive care unit stay was 1.76±1.14 days. The mean hospital stay was 9.33±5.06 days. No complications were observed in 56.52% patients during their hospital stay. The overall hospital mortality was 8.7%. Follow-up was completed for all 23 patients. Median follow-up time was 33 months (1-108 months. Actuarial survival among discharged from hospital was 59% at 5 years. Discussion: Mechanical aortic valve replacement is a safe procedure in octogenarian patients and can be performed safely even in combined procedure.

  9. 5/8'' baffle bolt replacement

    International Nuclear Information System (INIS)

    Pinaud, T.; Grypczynski, D.

    1999-01-01

    Both Framatome Nuclear Services in France and its U.S. arm, FT1, are now equipped with baffle bolt inspection and replacement packages. These packages allow them to tackle baffle bold degradation on both two- and three-loop nuclear power plants. Framatome and FT1 together are world leaders in addressing reactor vessel internal bolting concerns

  10. Optimal strategies for a replacement model

    NARCIS (Netherlands)

    Bruns, P.B.

    2000-01-01

    We examine a replacement system with discrete-time Markovian deterioration and finite state space $\\{0,\\ldots,N\\}$. State 0 stands for a new system, and the higher the state the worse the system; a system in state $N$ is considered to be in a {\\it bad state}. We impose the condition that the

  11. Who Will Replace Those Vanishing Execs?

    Science.gov (United States)

    Geber, Beverly

    2000-01-01

    Many top-level managers are retiring early. Programs to prepare their replacements have been scaled back. Many companies are offering phased retirement plans, redesigning jobs, and paying for spouses to go along on business trips to keep their managers a little longer. (JOW)

  12. Probability Issues in without Replacement Sampling

    Science.gov (United States)

    Joarder, A. H.; Al-Sabah, W. S.

    2007-01-01

    Sampling without replacement is an important aspect in teaching conditional probabilities in elementary statistics courses. Different methods proposed in different texts for calculating probabilities of events in this context are reviewed and their relative merits and limitations in applications are pinpointed. An alternative representation of…

  13. Solid-State Thyratron Replacement. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Roth, Ian [Diversified Technologies, Inc., Bedford, MA

    2017-12-12

    Under this SBIR, DTI developed a solid-state switch as an alternative to legacy thyratron equipment. Our Phase II objective was to make a solid-state thyratron replacement that would provide equivalent or better performance, much higher reliability (at least a 20 year lifetime, compared to a thyratron’s two-year lifetime) and would sell for ~3x the cost of a thyratron, or less than $40k. We were successful in building a solid-state switch which could reliably function as a thyratron replacement. The unit was designed to directly replace the thyratrons currently being used at SLAC’s Linac Coherent Light Source (LCLS), and was built in a tank that was small enough to fit into the existing thyratron cabinet, providing a true form-fit-function replacement path. We tested the switch at the full operating specifications: 48 kV, 6.3 kA, and 1 µs risetime. We also demonstrated a peak-to-peak pulse jitter of 1.5 ns, which is five times shorter than is typical for thyratrons. This lower jitter would improve the performance of the LCLS beam. The predicted reliability is more than 80 years, which is 40 times greater than a thyratron.

  14. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  15. Heart valve replacements with regenerative capacity

    NARCIS (Netherlands)

    Dijkman, P.E.; Fioretta, E.S.; Frese, L.; Pasqualini, F.S.; Hoerstrup, S.P.

    2016-01-01

    The incidence of severe valvular dysfunctions (e.g., stenosis and insufficiency) is increasing, leading to over 300,000 valves implanted worldwide yearly. Clinically used heart valve replacements lack the capacity to grow, inherently requiring repetitive and high-risk surgical interventions during

  16. Older Person's Guide to Joint Replacement

    Science.gov (United States)

    ... who prep for surgery and follow through with physical therapy afterward can further boost their odds of a good outcome. If you’re considering joint replacement surgery, here’s what the experts with the American Geriatrics Society’s Foundation for Health in Aging (FHA) suggest: Ask ...

  17. Continuous vasopressin replacement in diabetes insipidus.

    OpenAIRE

    Ralston, C; Butt, W

    1990-01-01

    Five children who developed diabetes insipidus as a manifestation of severe brain injury received continuous intravenous treatment with a solution containing both aqueous vasopressin and appropriate crystalloid replacement. Polyuria, hypernatraemia, and decreased urine osmolalities were safely corrected in all patients within eight to 28 hours.

  18. Aggression Replacement Training and Childhood Trauma

    Science.gov (United States)

    Amendola, A. Mark; Oliver, Robert W.

    2013-01-01

    Aggression Replacement Training (ART) was developed by the late Arnold Goldstein of Syracuse University to teach positive alternatives to children and youth with emotional and behavioral problems (Glick & Gibbs, 2011; Goldstein, Glick, & Gibbs, 1998). ART provides cognitive, affective, and behavioral interventions to build competence in…

  19. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    Dunn, J.T.; Kakaria, B.K.

    1982-09-01

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  20. Telerehabilitation Feasibility in Total Joint Replacement

    Directory of Open Access Journals (Sweden)

    Mark J. Nelson

    2017-11-01

    Full Text Available Despite documented benefits, many Total Joint Replacement (TJR patients find it difficult to access rehabilitation following discharge from hospital. One solution to improve access for TJR patients is telerehabilitation. This study aimed to assess the feasibility of introducing a telerehabilitation program for TJR patients.   TJR patients at QEII Jubilee Hospital were invited to complete a questionnaire regarding their access, feelings towards and preferences in using technology. Seventy-five patients were recruited. Most patients had computer access (72% and internet (69% at home. Sixty-five percent of participants were willing to participate in telerehabilitation. A significant difference was found between older and younger patients. Watching videos on an electronic device was the preferred method for a technology-based home exercise program and phone call the preferred method of communication.  Results indicate telerehabilitation in the TJR population is feasible from the perspective of access to, feelings toward, and preferences for technology. Keywords: Hip replacement, Knee replacement, Telerehabilitation, Telemedicine, Total joint replacement

  1. Hormone replacement therapy and risk of glioma

    DEFF Research Database (Denmark)

    Andersen, Lene; Friis, Søren; Hallas, Jesper

    2013-01-01

    Aim: Several studies indicate that use of hormone replacement therapy (HRT) is associated with an increased risk of intracranial meningioma, while associations between HRT use and risk of other brain tumors have been less explored. We investigated the influence of HRT use on the risk of glioma...

  2. Antibiotic Dosing in Continuous Renal Replacement Therapy.

    Science.gov (United States)

    Shaw, Alexander R; Mueller, Bruce A

    2017-07-01

    Appropriate antibiotic dosing is critical to improve outcomes in critically ill patients with sepsis. The addition of continuous renal replacement therapy makes achieving appropriate antibiotic dosing more difficult. The lack of continuous renal replacement therapy standardization results in treatment variability between patients and may influence whether appropriate antibiotic exposure is achieved. The aim of this study was to determine if continuous renal replacement therapy effluent flow rate impacts attaining appropriate antibiotic concentrations when conventional continuous renal replacement therapy antibiotic doses were used. This study used Monte Carlo simulations to evaluate the effect of effluent flow rate variance on pharmacodynamic target attainment for cefepime, ceftazidime, levofloxacin, meropenem, piperacillin, and tazobactam. Published demographic and pharmacokinetic parameters for each antibiotic were used to develop a pharmacokinetic model. Monte Carlo simulations of 5000 patients were evaluated for each antibiotic dosing regimen at the extremes of Kidney Disease: Improving Global Outcomes guidelines recommended effluent flow rates (20 and 35 mL/kg/h). The probability of target attainment was calculated using antibiotic-specific pharmacodynamic targets assessed over the first 72 hours of therapy. Most conventional published antibiotic dosing recommendations, except for levofloxacin, reach acceptable probability of target attainment rates when effluent rates of 20 or 35 mL/kg/h are used. Copyright © 2017 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  3. Joint Replacement (Finger and Wrist Joints)

    Science.gov (United States)

    ... All Topics A-Z Videos Infographics Symptom Picker Anatomy Bones Joints Muscles Nerves Vessels Tendons About Hand Surgery What is a Hand Surgeon? What is a Hand Therapist? Media Find a Hand Surgeon Home Anatomy Joint Replacement Email to a friend * required fields ...

  4. Steam generator replacement from ALARA aspects

    International Nuclear Information System (INIS)

    Terry, I.; Breznik, B.

    2003-01-01

    This paper is going to consider radiological related parameters important for steam generator replacement (SGR) implementation. These parameters are identified as ALARA related parameters, owner-contractor relationship, planning, health physics with logistic services, and time required for the replacement. ALARA related parameters such as source or initial dose rate and plant system configuration define the initial conditions for the planning. There is room to optimise work planning. managerial procedures and also the staff during the implementation phase. The overview of these general considerations is based on the following background: using internationally available data and the experience of one of the vendors, i.e. Siemens-Framatome, and management experience of SG replacement which took place at Krsko NPP in the spring of 2000. Generally plant decisions on maintenance or repair procedures under radiation conditions take into account ALARA considerations. But in the main it is difficult to adjudge the results of an ALARA study, usually in the form of a collective dose estimate, because a comparison standard is missing. That is, very often the planned work is of a one-off nature so comparisons are not possible or the scopes are not the same. In such a case the collective doses for other types of work are looked at and a qualitative evaluation is made. In the case of steam generator replacement this is not the case. Over years of steam generator replacements world-wide a standard has been developed gradually. The first part of the following displays an overview of SGR and sets the Krsko SGR in perspective by applying dose analysis. The second part concentrates on the Krsko SGR itself and its ALARA aspects. (authors)

  5. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints. Copyright © 2016 Elsevier Inc. All rights reserved.

  6. 49 CFR 541.6 - Requirements for replacement parts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Requirements for replacement parts. 541.6 Section....6 Requirements for replacement parts. (a) Each replacement part for a part specified in § 541.5(a) must have the registered trademark of the manufacturer of the replacement part, or some other unique...

  7. 30 CFR 800.30 - Replacement of bonds.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Replacement of bonds. 800.30 Section 800.30... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.30 Replacement... replacement performance bonds. Replacement of a performance bond pursuant to this section shall not constitute...

  8. 31 CFR 361.8 - Claim for replacement.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Claim for replacement. 361.8 Section... § 361.8 Claim for replacement. Claim for replacement shall be made in writing to the Secretary, to the..., Parkersburg, WV 26106-1328. The claim, accompanied by a recommendation regarding the manner of replacement...

  9. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  10. Age replacement models: A summary with new perspectives and methods

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Al-Khalifa, Khalifa N.; Magid Hamouda, Abdel; Nakagawa, Toshio

    2017-01-01

    Age replacement models are fundamental to maintenance theory. This paper summarizes our new perspectives and hods in age replacement models: First, we optimize the expected cost rate for a required availability level and vice versa. Second, an asymptotic model with simple calculation is proposed by using the cumulative hazard function skillfully. Third, we challenge the established theory such that preventive replacement should be non-random and only corrective replacement should be made for the unit with exponential failure. Fourth, three replacement policies with random working cycles are discussed, which are called overtime replacement, replacement first, and replacement last, respectively. Fifth, the policies of replacement first and last are formulated with general models. Sixth, age replacement is modified for the situation when the economical life cycle of the unit is a random variable with probability distribution. Finally, models of a parallel system with constant and random number of units are taken into considerations. The models of expected cost rates are obtained and optimal replacement times to minimize them are discussed analytically and computed numerically. Further studies and potential applications are also indicated at the end of discussions of the above models. - Highlights: • Optimization of cost rate for availability level is discussed and vice versa. • Asymptotic and random replacement models are discussed. • Overtime replacement, replacement first and replacement last are surveyed. • Replacement policy with random life cycle is given. • A parallel system with random number of units is modeled.

  11. Estimating the shear strength of concrete with coarse aggregate replacement

    OpenAIRE

    Folagbade Olusoga Peter ORIOLA; George MOSES; Jacob Oyeniyi AFOLAYAN; John Engbonye SANI

    2017-01-01

    For economic, environmental and practical reasons, it is desirable to replace the constituents of concrete with wastes and cheaper alternative materials. However, it is best when such replacements are done at optimum replacement levels. In view of this, a laboratory investigative test was carried out to evaluate the shear strength of concrete with coarse aggregate replacement by Coconut Shell and by Waste Rubber Tyre. The coarse aggregate replacement was done at recommended optimum proportion...

  12. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  13. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  14. Reliability tests for reactor internals replacement technology

    International Nuclear Information System (INIS)

    Fujimaki, K.; Uchiyama, J.; Ohtsubo, T.

    2000-01-01

    Structural damage due to aging degradation of LWR reactor internals has been reported in several nuclear plants. NUPEC has started a project to test the reliability of the technology for replacing reactor internals, which was directed at preventive maintenance before damage and repair after damage for the aging degradation. The project has been funded by the Ministry of International Trade and Industry (MITI) of Japan since 1995, and it follows the policy of a report that the MITI has formally issued in April 1996 summarizing the countermeasures to be considered for aging nuclear plants and equipment. This paper gives an outline of the whole test plans and the test results for the BWR reactor internals replacement methods; core shroud, ICM housing, and CRD Housing and stub tube. The test results have shown that the methods were reliable and the structural integrity was appropriate based on the evaluation. (author)

  15. Autogenous Transplantation for Replacing a Hopeless Tooth.

    Science.gov (United States)

    Zakershahrak, Mehrsa; Moshari, Amirabbas; Vatanpour, Mehdi; Khalilak, Zohreh; Jalali Ara, Afsoon

    2017-01-01

    Autogenous tooth transplantation (ATT) is a simple and reasonable choice for replacing the missing teeth when a proper donor tooth is available. This report presents a case of successful ATT of a maxillary right third molar for replacement of mandibular right second molar with a concomitant endodontic-periodontal disease. The mandibular second molar was believed to be hopeless due to a severe damage to coronal tooth structure, inappropriate root canal treatment and apical radiolucency. After extraction of mandibular second molar and maxillary third molar (the donor), the tooth was re-implanted into the extracted socket of second molar site. Root canal therapy was then performed. After 3 years, clinical and radiographic examinations revealed satisfying results, with no signs and symptoms. The patient is asymptomatic and the transplanted tooth is still functional with no signs of marginal periodontal pathosis. Radiographies showed bone regeneration in the site of previous extensive periapical lesion, normal periodontal ligament with no signs of root resorption.

  16. Optimal glucocorticoid replacement in adrenal insufficiency.

    Science.gov (United States)

    Øksnes, Marianne; Ross, Richard; Løvås, Kristian

    2015-01-01

    Adrenal insufficiency (glucocorticoid deficiency) comprises a group of rare diseases, including primary adrenal insufficiency, secondary adrenal insufficiency and congenital adrenal hyperplasia. Lifesaving glucocorticoid therapy was introduced over 60 years ago, but since then a number of advances in treatment have taken place. Specifically, little is known about short- and long-term treatment effects, and morbidity and mortality. Over the past decade, systematic cohort and registry studies have described reduced health-related quality of life, an unfavourable metabolic profile and increased mortality in patients with adrenal insufficiency, which may relate to unphysiological glucocorticoid replacement. This has led to the development of new modes of replacement that aim to mimic normal glucocorticoid physiology. Here, evidence for the inadequacy of conventional glucocorticoid therapy and recent developments in treatment are reviewed, with an emphasis on primary adrenal insufficiency. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  18. Replacement Power Facility site selection report

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  19. Psychosocial determinants of outcomes in knee replacement.

    Science.gov (United States)

    Lopez-Olivo, Maria A; Landon, Glenn C; Siff, Sherwin J; Edelstein, David; Pak, Chong; Kallen, Michael A; Stanley, Melinda; Zhang, Hong; Robinson, Kausha C; Suarez-Almazor, Maria E

    2011-10-01

    To identify potential psychosocial and educational barriers to clinical success following knee replacement. The authors evaluated 241 patients undergoing total knee replacement, preoperatively and 6 months after surgery. Outcomes included the Western Ontario McMaster (WOMAC) scale and the Knee Society rating system (KSRS). Independent variables included: the medical outcome study-social support scale; depression, anxiety and stress scale; brief COPE inventory; health locus of control; arthritis self-efficacy scale and the life orientation test-revised. Multiple regression models evaluated associations of baseline demographic and psychosocial variables with outcomes at 6 months, controlling for body mass index, comorbidities and baseline outcome scores. Patients' mean age was 65 ± 9 years; 65% were women. Most patients improved outcomes after surgery. Several psychosocial variables were associated with outcomes. Regression analyses indicated lower education, less tangible support, depression, less problem-solving coping, more dysfunctional coping, lower internal locus of control were associated with worse WOMAC scores (R(2) contribution of psychosocial variables for pain 0.07; for function, 0.14). Older age, lower education, depression and less problem-solving coping were associated with poorer total KSRS scores (R(2) contribution of psychosocial variables to total KSRS model 0.09). Psychosocial variables as a set contributed from 25% to 74% of total explained variance across the models tested. Patients' level of education, tangible support, depression, problem-solving coping, dysfunctional coping and internal locus of control were associated with pain and functional outcomes after knee replacement. The findings suggest that, in addition to medical management, perioperative psychosocial evaluation and intervention are crucial in enhancing knee replacement outcomes.

  20. Replacement team of mining drilling rigs

    OpenAIRE

    Hamodi, Hussan; Lundberg, Jan

    2014-01-01

    This paper presents a practical model to calculate the optimal replacement time (ORT) of drilling rigs used in underground mining. As a case study, cost data for drilling rig were collected over four years from a Swedish mine. The cost data include acquisition, operating, maintenance and downtime costs when using a redundant rig. A discount rate is used to determine the value of these costs over time. The study develops an optimisation model to identify the ORT of a mining drilling rig which ...

  1. Changing trends in total knee replacement

    OpenAIRE

    Goudie, Ewan; Robinson, Cal; Walmsley, Phil; Brenkel, Ivan

    2017-01-01

    Introduction:  This study evaluates a possible change in the demographics and surgical practice observed in a large cohort of patients undergoing total knee replacement (TKR). Patients and methods:  We performed a retrospective analysis of a prospectively collected data on two groups of consecutive patients undergoing primary TKR. Group one consisted of patients who underwent surgery between 1994 and 1998. Group two consisted of patients who had surgery between 2009 and 2012. Results:  The me...

  2. Maintenance and replacement policies under technological obsolescence

    International Nuclear Information System (INIS)

    Clavareau, Julien; Labeau, Pierre-Etienne

    2009-01-01

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur

  3. Reactor console replacement at Washington State University

    International Nuclear Information System (INIS)

    Lovas, Thomas A.

    1978-01-01

    A replacement reactor console was installed in 1977 at the W.S.U. 1 MW TRIGA-fueled reactor as the final step in an instrumentation upgrade program. The program was begun circa 1972 with the design, construction and installation of various systems and equipment. Major instruments were installed in the existing console and tested in the course of reactor operation. The culmination of the program was the installation of a cubicle designed and constructed to house the updated instrumentation. (author)

  4. Aortic valve replacement during acute rheumatic fever.

    Science.gov (United States)

    Khan, A; Chi, S; Gonzalez-Lavin, L

    1978-07-01

    Emergency aortic valve replacement was performed during an attack of acute rheumatic fever in a 12-year-old black boy. He had an uneventful recovery and has remained asymptomatic 27 months after operation. In the light of this experience and that of others, one might conclude that the decision to operate on these patients should be based on the severity of the haemodynamic derangement rather than on the state of activity in the rheumatic process.

  5. Final Environmental Assessment, Horse Creek Bridge Replacement

    Science.gov (United States)

    2010-10-01

    existing bridge pipes that have failed and replace the failed structure with a new, prefabricated pedestrian bridge within the original bridge footprint...vehicles, nor designed for support of standard passenger vehicle loads. The bridge would be a single prefabricated unit consisting of a steel grate...placed on new concrete abutments built on the existing foundations on the creek banks, and put in place by a crane operating from the vehicle parking

  6. Maintenance and replacement policies under technological obsolescence

    Energy Technology Data Exchange (ETDEWEB)

    Clavareau, Julien [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: jclavare@ulb.ac.be; Labeau, Pierre-Etienne [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: pelabeau@ulb.ac.be

    2009-02-15

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur.

  7. Flow boiling test of GDP replacement coolants

    International Nuclear Information System (INIS)

    Park, S.H.

    1995-01-01

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C 4 F 10 and C 4 F 8 , were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C 4 F 10 mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C 4 F 10 weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd

  8. Enzyme Replacement Therapy for Fabry Disease

    Directory of Open Access Journals (Sweden)

    Maria Dolores Sanchez-Niño PhD

    2016-11-01

    Full Text Available Fabry disease is a rare X-linked disease caused by the deficiency of α-galactosidase that leads to the accumulation of abnormal glycolipid. Untreated patients develop potentially lethal complications by age 30 to 50 years. Enzyme replacement therapy is the current standard of therapy for Fabry disease. Two formulations of recombinant human α-galactosidase A (agalsidase are available in most markets: agalsidase-α and agalsidase-β, allowing a choice of therapy. However, the US Food and Drug Administration rejected the application for commercialization of agalsidase-α. The main difference between the 2 enzymes is the dose. The label dose for agalsidase-α is 0.2 mg/kg/2 weeks, while the dose for agalsidase-β is 1.0 mg/kg/2 weeks. Recent evidence suggests a dose-dependent effect of enzyme replacement therapy and agalsidase-β is 1.0 mg/kg/2 weeks, which has been shown to reduce the occurrence of hard end points (severe renal and cardiac events, stroke, and death. In addition, patients with Fabry disease who have developed tissue injury should receive coadjuvant tissue protective therapy, together with enzyme replacement therapy, to limit nonspecific progression of the tissue injury. It is likely that in the near future, additional oral drugs become available to treat Fabry disease, such as chaperones or substrate reduction therapy.

  9. Transdermal testosterone replacement therapy in men

    Directory of Open Access Journals (Sweden)

    Ullah MI

    2014-01-01

    Full Text Available M Iftekhar Ullah,1 Daniel M Riche,1,2 Christian A Koch1,31Department of Medicine, University of Mississippi Medical Center, 2Department of Pharmacy Practice, The University of Mississippi, 3GV (Sonny Montgomery VA Medical Center, Jackson, MS, USAAbstract: Androgen deficiency syndrome in men is a frequently diagnosed condition associated with clinical symptoms including fatigue, decreased libido, erectile dysfunction, and metabolic syndrome. Serum testosterone concentrations decline steadily with age. The prevalence of androgen deficiency syndrome in men varies depending on the age group, known and unknown comorbidities, and the respective study group. Reported prevalence rates may be underestimated, as not every man with symptoms of androgen deficiency seeks treatment. Additionally, men reporting symptoms of androgen deficiency may not be correctly diagnosed due to the vagueness of the symptom quality. The treatment of androgen deficiency syndrome or male hypogonadism may sometimes be difficult due to various reasons. There is no consensus as to when to start treating a respective man or with regards to the best treatment option for an individual patient. There is also lack of familiarity with treatment options among general practitioners. The formulations currently available on the market are generally expensive and dose adjustment protocols for each differ. All these factors add to the complexity of testosterone replacement therapy. In this article we will discuss the general indications of transdermal testosterone replacement therapy, available formulations, dosage, application sites, and recommended titration schedule.Keywords: hypogonadism, transdermal, testosterone, sexual function, testosterone replacement therapy, estradiol

  10. [Update in continuous renal replacement techniques].

    Science.gov (United States)

    Romero-García, M; de la Cueva-Ariza, L; Delgado-Hito, P

    2013-01-01

    Acute renal failure affects 25% of patients hospitalized in intensive care units. Despite technological advances, the mortality of these patients is still high due to its associated complications. Continuous renal replacement techniques are one of the treatments for acute renal failure because they make it possible to treat the complications and decrease mortality. The nurse's knowledge and skills regarding these techniques will be decisive for the success of the therapy. Consequently, the nurse's experience and training are key components. The objective of this article is to update the knowledge on continuous renal replacement techniques. Keeping this in mind, a review has been made of the physical and chemical principles such as diffusion and convection, among others. A description of the different continuous renal replacement techniques, a presentation of the main vascular access, and a description of the nursing cares and complications related to techniques used have also been provided. Copyright © 2012 Elsevier España, S.L. y SEEIUC. All rights reserved.

  11. Soil Overconsolidation Changes Caused by Dynamic Replacement

    Science.gov (United States)

    Piotr, Kanty; Sławomir, Kwiecień; Jerzy, Sękowski

    2017-10-01

    In the dynamic replacement method (DR) the soil is improved by initially dropping a large weight (typically 8-20 t) pounder from a significant height up to 25 m. The created crater is filled with a stronger material (gravel, rubble, stone aggregate, debris), and the pounder is dropped once or multiple times again. The construction of dynamic replacement pillars influences the parameters of the adjacent soil. It results from the energy generated by dropping a pounder into the soil. In the current practice, these changes are not taken into the account during the design. This paper focuses on the changes of overconsolidation ratio (OCR) and in situ coefficient of lateral earth pressure (K) values estimated base on cone penetration test (CPTU) and Dilatometric test (DMT) performed at a test site. A single column was constructed and the ground around the column was examined using CPTU and DMT, performed at different distances from the column centre (2, 3, 4 and 6 m) and at different time intervals (during construction and 1, 8, 30 days later). The column was constructed in so-called transition soils (between cohesive and non-cohesive). While interpreting the results of the research, the authors addressed the matter of choosing the procedure of OCR and K indication for transition soils (in this case described as silts and/or sandy silts). Overconsolidation changes may differ depending on the chosen analysis procedure (for cohesive or non-cohesive soils). On the basis of the analysis presented in the paper and the observation of soil (acknowledged as cohesive according to macroscopic observations) during column excavation, it was decided that for more detailed analyses methods dedicated to cohesive soils should be applied. Generally, it can be stated that although the changes were complex, DR pillar formation process resulted in the increase of these parameters. The average increases of OCR and K values were 25% and 10% respectively. The post installation values are not

  12. Extended replacement of the thoracic aorta.

    Science.gov (United States)

    Hino, Yutaka; Okada, Kenji; Oka, Takanori; Inoue, Takeshi; Tanaka, Akiko; Omura, Atsushi; Kano, Hiroya; Okita, Yutaka

    2013-01-01

    We present our experience of total aortic arch replacement. Twenty-nine patients (21 males and 8 females; mean age 63.3 ± 13.3 years) with extended thoracic aortic aneurysms underwent graft replacement. The pathology of the diseased aorta was non-dissecting aneurysm in 11 patients, including one aortitis and aortic dissection in 18 patients (acute type A: one, chronic type A: 11, chronic type B: six). Five patients had Marfan syndrome. In their previous operation, two patients had undergone the Bentall procedure, three had endovascular stenting, one had aortic root replacement with valve sparing and 12 had hemi-arch replacement for acute type A dissection. Approaches to the aneurysm were as follows: posterolateral thoracotomy with rib-cross incision in 16, posterolateral thoracotomy extended to the retroperitoneal abdominal aorta in seven, mid-sternotomy and left pleurotomy in three, anterolateral thoracotomy with partial lower sternotomy in two and clam-shell incision in one patient. Extension of aortic replacement was performed from the aortic root to the descending aorta in 4, from the ascending aorta to the descending aorta in 17 and from the ascending to the abdominal aorta in eight patients. Arterial inflow for cardiopulmonary bypass consisted of the femoral artery in 15 patients, ascending aorta and femoral artery in seven, descending or abdominal aorta in five and ascending aorta in two. Venous drainage site was the femoral vein in 10, pulmonary artery in eight, right atrium in five, femoral artery with right atrium/pulmonary artery in four and pulmonary artery with right atrium in two patients. The operative mortality, 30-day mortality and hospital mortality was one (cardiac arrest due to aneurysm rupture), one (rupture of infected aneurysm) and one (brain contusion), respectively. Late mortality occurred in three patients due to pneumonia, ruptured residual aneurysm and intracranial bleeding. Actuarial survival at 5 years after the operations was 80.6

  13. New Firm Performance and the Replacement of Founder-CEOs

    DEFF Research Database (Denmark)

    Chen, Jing; Thompson, Peter

    2015-01-01

    We study the causes and consequences of the replacement of founder-CEOs in a sample of 4,172 Danish start-ups. We propose that founder-CEO replacement is driven in part by mismatches between business quality and founder ability. Our framework suggests that replacements are more likely among...... the worst- and best-performing firms, with low (high)-ability founders replaced by manager with higher (lower) ability. Replacement is not unambiguously associated with better subsequent performance. Firms that replaced the founder were much more likely to fail, but the surviving firms among them grew...

  14. Lower limb joint replacement in rheumatoid arthritis

    Directory of Open Access Journals (Sweden)

    Clement Nicholas D

    2012-06-01

    Full Text Available Abstract Introduction There is limited literature regarding the peri-operative and surgical management of patients with rheumatoid disease undergoing lower limb arthroplasty. This review article summarises factors involved in the peri-operative management of major lower limb arthroplasty surgery for patients with rheumatoid arthritis. Methods We performed a search of the medical literature, using the PubMed search engine (http://www.pubmed.gov. We used the following terms: ‘rheumatoid’ ‘replacement’ ‘arthroplasty’ and ‘outcome’. Findings The patient should be optimised pre-operatively using a multidisciplinary approach. The continued use of methotrexate does not increase infection risk, and aids recovery. Biologic agents should be stopped pre-operatively due the increased infection rate. Patients should be made aware of the increased risk of infection and periprosthetic fracture rates associated with their disease. The surgical sequence is commonly hip, knee and then ankle. Cemented total hip replacement (THR and total knee replacement (TKR have superior survival rates over uncemented components. The evidence is not clear regarding a cruciate sacrificing versus retaining in TKR, but a cruciate sacrificing component limits the risk early instability and potential revision. Patella resurfacing as part of a TKR is associated with improved outcomes. The results of total ankle replacement remain inferior to THR and TKR. RA patients achieve equivalent pain relief, but their rehabilitation is slower and their functional outcome is not as good. However, the key to managing these complicated patients is to work as part of a multidisciplinary team to optimise their outcome.

  15. Preliminary study of possible ORELA replacement options

    International Nuclear Information System (INIS)

    Olsen, D.K.; Martin, J.A.; Horen, D.J.

    1984-06-01

    Based on two conceptual design studies performed by the LANL Accelerator Technology Division, the possibilities in terms of accelerator systems for replacing ORELA with a more intense Maxwellian-type continuous-energy neutron source are summarized and discussed. The neutron intensities from ORELA are compared with those from existing or potential accelerator systems used for cross-section and condensed-matter studies. The best replacement options seem to involve a spallation source from 200- to 400-MeV protons on an ORELA-like target. Pulsing and intensity desiderata with such a source are discussed which correspond to a spectrum-averaged 100-fold improved figure of merit over ORELA for TOF measurements with only a tenfold increased source strength. Existing accelerator designs seem to be inadequate for such a source. Consequently, two conceptual designs were developed for this study by the LANL Accelerator Technology Division. The first conceptual design is for a 200-MeV large linac capable of accelerating 1.3 A during a macropulse; this linac standing alone could serve as an ORELA replacement source. The second conceptual design is for a much smaller 250-MeV PIGMI linac with a 28-mA macropulse current which feeds a proton accumulator ring and bunch-compressor transport line. This linac-ring-compressor (LIRIC) option would give a more cost-effective neutron source for cross-section measurements, whereas the large linac, or a modified version of it, would give a much simpler system more suitable for expansion. In particular, both conceptual designs would incorporate the present ORELA building and would provide approximately 100-fold improved neutron sources over ORELA for cross-section measurements. The total estimated cost of the LIRIC system would be $43M (1984), whereas the cost of the large linac would be about a factor of two more. 55 references, 11 figures, 19 tables

  16. Aorto-right atrial fistula after ascending aortic replacement or aortic value replacement

    International Nuclear Information System (INIS)

    Zhi Aihua; Dai Ruping; Jiang Shiliang; Lu Bin

    2012-01-01

    Objective: To evaluate the CT features of aorto-right atrial fistula after aortic valve replacement (AVR) or ascending aortic replacement. Methods: Eighty-seven patients with aortic-right atrial fistula underwent CT after operation. The CT features were retrospectively analyzed. Fistula was measured according to maximum width of the shunt. Results: Aorto-right atrial fistula was detected in 87 patients after aortic valve replacement or ascending aortic replacement by CT scan. Among them, 25 patients were diagnosed as mild aorto-right atrial fistula, 47 patients as moderate, and 15 patients as severe. Thirty-seven patients underwent follow-up CT.Among them, 10 patients with mild to moderate aorto-right atrial fistula were considered to have complete regression, 8 patients with mild aorto-right atrial fistula considered to have incomplete regression, 14 patients with mild to moderate aorto-right atrial fistula considered to have stable condition, and 5 patients with moderate aorto-right atrial fistula considered to have progression at the 3-month follow-up. Conclusion: CT is a useful tool for defining aorto-right atrial fistula after AVR or ascending aortic replacement and for evaluating it in follow-up. (authors)

  17. Machine Replacement, Technology Adoption and Convergence.

    OpenAIRE

    Boucekkine, Raouf; Martinez, Blanca

    1999-01-01

    In this paper, we introduce adoption costs in a canonical vintage capital model. Adoption costs take the form of a direct loss in production during a fixed period of time. We explicitly characterize the optimal machine replacement policy as a function of the adoption period. Using an explicit numerical method, we study the dynamics of the model. In particular, we find that while an increase in the adoption costs lowers the long run level of output, it also rises the magnitude of short run flu...

  18. Reactor vessel closure head replacements in 1997

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Framatome-Jeumont Industrie consortium have completed in 1997 28 reactor vessel (RV) closure head replacements, including five on 1300 MWe class PWR units. Framatome manages the operations and handles removal and reinstallation of equipment (not including the control rod drive mechanisms (CRDM)) and the requalification tests, while JI, which manufactures the CRDMs, is involved in the CRDM cutting, re-machining and welding operations, using tools of original design, in order to optimize the RV closure head operation in terms of costs, schedule and dosage

  19. Replacing OSE with Real Time capable Linux

    OpenAIRE

    Boman, Simon; Rutgersson, Olof

    2009-01-01

    For many years OSE has been a common used operating system, with real time extensions enhancements, in embed-ded systems. But in the last decades, Linux has grown and became a competitor to common operating systems and, in recent years, even as an operating system with real time extensions. With this in mind, ÅF was interested in replacing the quite expensive OSE with some distribution of the open source based Linux on a PowerPC MPC8360. Therefore, our purpose with thesis is to implement Linu...

  20. The replacement of technically obsolete equipments

    International Nuclear Information System (INIS)

    Anglaret, Ph.; Patouillaud, M.

    1987-01-01

    The paper covers the analysis of procedures for replacement of technically obsolete but still operational equipments in use in a nuclear power plant. The Three Mile Island accident showed that operators in the control room reqire additional information at their disposal. In 1986 CGEE Alsthom received two orders for improvements to control systems, for the South African nuclear power plant Koeberg and the Dutch nuclear power plant Borssele. The new systems will provide support to normal operation and offer additional help in accident situations. 4 figs

  1. To learn more about BHT replacement

    CERN Multimedia

    2002-01-01

    Following the article 'An improved financial tool to replace BHT' which appeared in Bulletin No 41/2002, dates of 4 general presentations were published. Please note that the time of the first presentation has changed from 16.00 hrs to 14.00 hrs. The dates/times are now as follows: Wednesday 16 October 14.00 hrs* IT Auditorium (English) *note change of time. Friday 18 October 16.00 hrs, SL Auditorium (French) Monday 21 October 10.00 hrs, LHC Auditorium (French) Wednesday 23 October 10.00 hrs, Council Chamber (English)

  2. Aortic Annular Enlargement during Aortic Valve Replacement

    Directory of Open Access Journals (Sweden)

    Selman Dumani

    2016-09-01

    Full Text Available In the surgery of aortic valve replacement is always attempted, as much as possible, to implant the larger prosthesis with the mains goals to enhance the potential benefits, to minimise transvalvular gradient, decrease left ventricular size and avoid the phenomenon of patient-prosthesis mismatch. Implantation of an ideal prosthesis often it is not possible, due to a small aortic annulus. A variety of aortic annulus enlargement techniques is reported to avoid patient-prosthesis mismatch. We present the case that has submitted four three times open heart surgery. We used Manouguian technique to enlarge aortic anulus with excellent results during the fourth time of surgery.

  3. Alternatives to testosterone replacement: testosterone restoration

    Directory of Open Access Journals (Sweden)

    Andrew McCullough

    2015-04-01

    Full Text Available The European Male Aging Study has demonstrated that the hypogonadism of male aging is predominantly secondary. Theoretically with appropriate stimulation from the pituitary, the aging testis should be able to produce eugonadal levels of testosterone. The strategies for the treatment of late onset hypogonadism (LOH have focused on replacement with exogenous testosterone versus restoration of endogenous production. The purpose of this article is to review existing peer-reviewed literature supporting the concept of restoration of endogenous testosterone in the treatment of LOH.

  4. Replacement of the ISIS control system

    International Nuclear Information System (INIS)

    Mannix, R.P.; Barton, C.J.; Brownless, D.M.; Kerr, J.C.

    1992-01-01

    In operation since 1985, ISIS is the world's most powerful pulsed spallation neutron source. The decision has been taken to replace the existing ISIS control system, which has been in use for over ten years. The problems of such a project, given the legacy of processor specific hardware and software are discussed, a long with the problems associated with incorporating existing interface hardware into any new system. Present progress using commercial workstation based control software is presented with, an assessment of the benefits and pitfalls of such an approach. (author)

  5. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  6. Infective endocarditis following transcatheter aortic valve replacement-

    DEFF Research Database (Denmark)

    Loh, Poay Huan; Bundgaard, Henning; S�ndergaard, Lars

    2013-01-01

    Transcatheter aortic valve replacement (TAVR) can improve the symptoms and prognosis of patients with severe aortic stenosis who, due to a high expected operative risk, would not have otherwise been treated surgically. If these patients develop prosthetic valve endocarditis, their presentations may...... be atypical causing a delay in the diagnosis and treatment. The management is also complicated by their comorbidities, and surgical treatment may not be feasible leading to a significant morbidity and mortality. We describe a case of an 85-year-old man with TAVI prosthetic valve endocarditis successfully...

  7. Steam generator replacement project in 2000

    International Nuclear Information System (INIS)

    Cerjak, J.; Holz, R.; Haus, J.; Gloaguen, C.

    1999-01-01

    NE Krsko has awarded the contract for the Steam Generator Replacement Project, which is one of the modernization projects in Krsko, to the Consortium of Siemens / Framatome in February 1998. This paper deals with the various aspects of the project: scope planning, engineering, preparation of modification packages for licensing, management, major techniques used, etc., showing also the status of the activities for the project which are scheduled to be performed in April through June 2000. The project is being performed on a turnkey basis, that means the Consortium is performing all engineering, preparation of the modification packages and site activities; NE Krsko is dealing with the licensing of the project.(author)

  8. Hypoparathyroidism: Replacement Therapy with Parathyroid Hormone

    Directory of Open Access Journals (Sweden)

    Lars Rejnmark

    2015-12-01

    Full Text Available Hypoparathyroidism (HypoPT is characterized by low serum calcium levels caused by an insufficient secretion of parathyroid hormone (PTH. Despite normalization of serum calcium levels by treatment with activated vitamin D analogues and calcium supplementation, patients are suffering from impaired quality of life (QoL and are at increased risk of a number of comorbidities. Thus, despite normalization of calcium levels in response to conventional therapy, this should only be considered as an apparent normalization, as patients are suffering from a number of complications and calcium-phosphate homeostasis is not normalized in a physiological manner. In a number of recent studies, replacement therapy with recombinant human PTH (rhPTH(1-84 as well as therapy with the N-terminal PTH fragment (rhPTH(1-34 have been investigated. Both drugs have been shown to normalize serum calcium while reducing needs for activated vitamin D and calcium supplements. However, once a day injections cause large fluctuations in serum calcium. Twice a day injections diminish fluctuations, but don't restore the normal physiology of calcium homeostasis. Recent studies using pump-delivery have shown promising results on maintaining normocalcemia with minimal fluctuations in calcium levels. Further studies are needed to determine whether this may improve QoL and lower risk of complications. Such data are needed before replacement with the missing hormone can be recommended as standard therapy.

  9. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  10. An improved financial tool to replace BHT

    CERN Multimedia

    2002-01-01

    In November, the BHT tool used to control financial data will be replaced by an improved and more powerful system, called CET for CERN Expenditure Tracking. The team in charge of CET. From left to right, sitting, Martyn Rankin, David McGlashan, standing, Per Gunnar Jonsson, James Purvis and Mikael Angberg. After 10 years of BHT at CERN, in order to face the challenges of the LHC era, and following the recommendations of the External Review Committee, the BHT application will be replaced by an improved and more powerful expenditure tracking tool called CET for CERN Expenditure Tracking. For those who are not familiar with it, the BHT, Budget Holders Toolkit, is a utility that provides a way to view CERN financial data. It is available for users who have access to at least one budget code. The new CET represents a tool that not only allows powerful analysis of the past, but also assists in forecasting the future. CET will offer significantly more functionality than BHT, including extended contract analysis, ...

  11. LS1 Report: Replacing an antique

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    At the PS Booster, the old beam dump and the shielding blocks surrounding it have been removed (see here). Installation of the new beam dump is now under way (see video).   The new PSB beam dump during its installation. At the PS, replacement of the old cooling and ventilation system, which dated back to 1957, is progressing well. The dismantling phase has just been completed and the tunnel is being prepared to receive a brand new ventilation system offering more efficient aeration of radioactive areas. At the same time, testing of the newly installed access system is under way. At the SPS, all the equipment of the Long Straight Section 1 (LSS1) has been removed to make way for the campaign to replace the irradiated cables, which started this week. In the LHC, the Radiation to Electronics (R2E) campaign is still progressing at a good clip, especially at Point 1, where the teams are two and a half months ahead of schedule. The Superconducting Magnets and Circuits Consolidation (SMACC) proje...

  12. BABAR IFR Replacement R and D

    CERN Document Server

    Berry, M

    2003-01-01

    The Instrumented Flux Return (IFR) of the BaBar detector will soon need to be replaced by a more robust muon detection system. Scintillator bars with embedded Wavelength Shifting (WLS) fibers and Limited Streamer Tubes are two replacement technology options. The scintillator bars are tested for attenuation length; and causes for the large width of the Photo Multiplier Tube (PMT) signal are analyzed by Monte Carlo simulation. Cooling techniques for Avalanche Photo Diodes (APD) are investigated. The fairly high attenuation length coupled with the narrow PMT signal make the scintillator a viable option for a muon detecting system. Continuing work will focus on increasing timing resolution using an APD to read the signal from the WLS fibers, and investigating the lifetime of the APD. The ability to read a signal from the LST on external copper strips is tested and signals are found to be clearly distinguishable from noise. The voltage is compared to count rate to find that the optimal operating voltage for the LS...

  13. Transdermal testosterone replacement therapy in men

    Science.gov (United States)

    Ullah, M Iftekhar; Riche, Daniel M; Koch, Christian A

    2014-01-01

    Androgen deficiency syndrome in men is a frequently diagnosed condition associated with clinical symptoms including fatigue, decreased libido, erectile dysfunction, and metabolic syndrome. Serum testosterone concentrations decline steadily with age. The prevalence of androgen deficiency syndrome in men varies depending on the age group, known and unknown comorbidities, and the respective study group. Reported prevalence rates may be underestimated, as not every man with symptoms of androgen deficiency seeks treatment. Additionally, men reporting symptoms of androgen deficiency may not be correctly diagnosed due to the vagueness of the symptom quality. The treatment of androgen deficiency syndrome or male hypogonadism may sometimes be difficult due to various reasons. There is no consensus as to when to start treating a respective man or with regards to the best treatment option for an individual patient. There is also lack of familiarity with treatment options among general practitioners. The formulations currently available on the market are generally expensive and dose adjustment protocols for each differ. All these factors add to the complexity of testosterone replacement therapy. In this article we will discuss the general indications of transdermal testosterone replacement therapy, available formulations, dosage, application sites, and recommended titration schedule. PMID:24470750

  14. Renal function after elective total hip replacement

    DEFF Research Database (Denmark)

    Perregaard, Helene; Damholt, Mette B; Solgaard, Søren

    2016-01-01

    Background and purpose - Acute kidney injury (AKI) is associated with increased short-term and long-term mortality in intensive care populations and in several surgical specialties, but there are very few data concerning orthopedic populations. We have studied the incidence of AKI and the prevale......Background and purpose - Acute kidney injury (AKI) is associated with increased short-term and long-term mortality in intensive care populations and in several surgical specialties, but there are very few data concerning orthopedic populations. We have studied the incidence of AKI...... and the prevalence of chronic kidney disease (CKD) in an elective population of orthopedic patients undergoing primary total hip replacement, hypothesizing that chronic kidney disease predisposes to AKI. Patients and methods - This was a single-center, population-based, retrospective, registry-based cohort study...... involving all primary elective total hip replacements performed from January 2003 through December 2012. Patient demographics and creatinine values were registered. We evaluated the presence of CKD and AKI according to the international guidelines for kidney disease (KDIGO Acute Kidney Injury Workgroup 2013...

  15. Meniscus tear surgery and meniscus replacement

    Science.gov (United States)

    Vaquero, Javier; Forriol, Francisco

    2016-01-01

    Summary Objective the menisci are easily injured and difficult to repair. The aim of this study was to analyze the current state of meniscal surgery aimed at preserving morphology and conserving the biomechanics of the knee to prevent joint degeneration. Methodology a search of the electronic medical literature database Medline was conducted, from http://www.ncbi.nlm.nih.gov/pubmed. The search was not limited by language. Candidate articles were identified by searching for those that included the keywords meniscus, surgery, suture, implant, allograft. The limits were included for clinical research and clinical trials. Basic research was not included. The studies selected were evaluated and classified in three different categories: basic science, reconstruction (suture and meniscectomy) and implants (scaffolds and allograft). Results the consequences of meniscectomy performed at a young age can lead to a joint cartilage degeneration twenty years later. There are few surgical options for the repair of meniscal injuries in order both to preserve the meniscus and to ensure the long term survival of the knee joint, meniscectomy, repair, suturing the tear, or reconstruction, when a meniscal allograft or synthetic substitute is used to replace the meniscus, but the biomechanical properties of the native meniscus are not reproduced entirely by the scaffolds that exist today. Conclusion therapies that successfully repair or replace the meniscus are therefore likely to prevent or delay osteoarthritis progression. PMID:27331034

  16. THE AGGREGATE IMPLICATIONS OF MACHINE REPLACEMENT: THEORY AND EVIDENCE

    OpenAIRE

    John Haltiwanger; Russell Cooper

    1992-01-01

    The authors study an economy in which producers incur resource costs to replace depreciated machines. The process of costly replacement and depreciation creates endogenous fluctuations in productivity, employment, and output of a single producer. The authors explore the spillover effects of machine replacement on other sectors of the economy and provide conditions for synchronized machine replacement by multiple independent producers. The implications of their model are generally consistent w...

  17. Method and refrigerants for replacing existing refrigerants in centrifugal compressors

    International Nuclear Information System (INIS)

    Kopko, W.L.

    1991-01-01

    This patent describes a method for replacing an existing refrigerant in a centrifugal compressor. It comprises selecting a desired impeller Mach number for the centrifugal compressor; selecting a base refrigerant constituent; combining at least one additive refrigerant constituent with the base refrigerant constituent to form a replacement refrigerant having at least one physical or chemical property different from the existing refrigerant and substantially providing the desired impeller Mach number in the centrifugal compressor; and replacing the existing refrigerant with the replacement refrigerant

  18. Property Assessment of Sponge Cake Added with Egg Replacer

    OpenAIRE

    Yaqiang He; Linlin Wang; Qian Lu

    2015-01-01

    Chicken egg which is always used in sponge cake production is likely to deteriorate during storage or transportation. This weakness prevents the wide use of chicken egg in sponge cake making. In order to solve this problem, egg replacer has been developed. In this study, effect of egg replacer on the property of sponge cake was analyzed. The result indicated egg replacer could improve the yield rate and specific volume of sponge cake. However, high content of egg replacer would negatively imp...

  19. 14 CFR 21.9 - Replacement and modification articles.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Replacement and modification articles. 21.9... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS General § 21.9 Replacement and modification articles. (a) If a person knows, or should know, that a replacement or modification article is reasonably likely to be...

  20. 30 CFR 75.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 75.1438 Section 75.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... attachment replacement. Wire rope attachments shall be replaced when cracked, deformed, or excessively worn. ...

  1. 30 CFR 57.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 57.19028 Section 57.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Hoisting Wire Ropes § 57.19028 End attachment replacement. Wire rope attachments shall be replaced when...

  2. 30 CFR 56.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 56.19028 Section 56.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Wire Ropes § 56.19028 End attachment replacement. Wire rope attachments shall be replaced when cracked...

  3. 45 CFR 201.70 - Treatment of replacement checks.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Treatment of replacement checks. 201.70 Section... STATES FOR PUBLIC ASSISTANCE PROGRAMS Review and Audits § 201.70 Treatment of replacement checks. (a... (FFP) for replacement checks under titles I, VI-A, X, XIV, XVI (AABD) except under the circumstances...

  4. 30 CFR 77.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 77.1438 Section 77.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... Personnel Hoisting Wire Ropes § 77.1438 End attachment replacement. Wire rope attachments shall be replaced...

  5. 30 CFR 56.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 56.12036 Section 56.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... § 56.12036 Fuse removal or replacement. Fuses shall not be removed or replaced by hand in an energized...

  6. Hip Resurfacing: An Alternative to Conventional Hip Replacement?

    Science.gov (United States)

    ... Is hip resurfacing a good alternative to hip replacement? Answers from Mark Spangehl, M.D. Hip resurfacing has lost favor with many surgeons ... women with poor bone quality. Unlike traditional hip replacement, hip resurfacing doesn't completely replace the "ball" ...

  7. 21 CFR 870.3710 - Pacemaker repair or replacement material.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Pacemaker repair or replacement material. 870.3710... (CONTINUED) MEDICAL DEVICES CARDIOVASCULAR DEVICES Cardiovascular Prosthetic Devices § 870.3710 Pacemaker repair or replacement material. (a) Identification. A pacemaker repair or replacement material is an...

  8. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Science.gov (United States)

    2010-10-01

    ... equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT... Special Items 908.7112 Materials handling equipment replacement standards. Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405...

  9. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  10. 16 CFR 501.3 - Replacement bags for vacuum cleaners.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Replacement bags for vacuum cleaners. 501.3... REQUIREMENTS AND PROHIBITIONS UNDER PART 500 § 501.3 Replacement bags for vacuum cleaners. Replacement bags for..., provided: (a) The quantity of contents is expressed in terms of numerical count of the bags; (b) A...

  11. Replacement Models Revisited | Alabi | Journal of Research in ...

    African Journals Online (AJOL)

    The objective is to review the annual total cost and the cumulative annual total cost average hitherto used as replacement methods. The study showed some disparity in the optimal age of single replacement as used by some authors. Hence, an arithmetic mean method of finding the optimal single- replacement- age of an ...

  12. New one cycle criteria for optimizing preventive replacement policies

    International Nuclear Information System (INIS)

    Hamidi, Maryam; Szidarovszky, Ferenc; Szidarovszky, Miklos

    2016-01-01

    Models are introduced and examined for the optimum scheduling of preventive replacements. The “replace first” and “replace last” models are known from the literature if the long term expected cost per unit time is minimized. We will first introduce the one cycle counterparts of these models when the expected costs per unit time in a single cycle is minimized. If the unit performs identical projects sequentially then the “replace next” model assumes that the preventive replacement is postponed until the ongoing project is finished. The termination time of this project is random which also depends on the scheduled time of the preventive replacement in contrary to the “replace first” and “replace last” models. The mathematical models are formulated and conditions are given for the existence of finite optima. Numerical examples and a simulation study illustrate the methodology and the numerical results show interesting comparisons of the different models. - Highlights: • The Single cycle age replacement model is extended incorporating repairable failures. • In order to avoid project interruption costs, three model variants are discussed. • Model variants are replace first, replace last and replace next. • In many cases analytic solutions are derived and illustrated by numerical examples. • The different model variants and their results are compared based on simulation studies.

  13. A single - item replacement decision model for repairable spare ...

    African Journals Online (AJOL)

    In this paper, we present an analytical method for determining spare parts replacement over an infinite planning horizon. (The objective is to minimize the total system cost). We develop an exact and simple method for determining the time for equipment replacement or making decision about when to replace equipments, ...

  14. 48 CFR 908.7101-4 - Replacement of motor vehicles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Replacement of motor....7101-4 Replacement of motor vehicles. (a) The replacement of motor vehicles shall be in accordance with... Heads of Contracting Activities may arrange to sell, as exchange sales, used motor vehicles being...

  15. Avascular necrosis of bone complicating corticosteroid replacement therapy.

    OpenAIRE

    Williams, P L; Corbett, M

    1983-01-01

    Two patients who developed widespread severe avascular necrosis of bone while on steroid replacement therapy are described. One, a diabetic, underwent yttrium-90 pituitary ablation for retinopathy and developed avascular necrosis within 18 months of starting prednisolone. The other, who had Addison's disease, developed avascular necrosis within 14 months of starting cortisol replacement therapy. Both cases came to bilateral total hip replacement.

  16. Optimal timing for intravenous administration set replacement.

    Science.gov (United States)

    Gillies, D; O'Riordan, L; Wallen, M; Morrison, A; Rankin, K; Nagy, S

    2005-10-19

    Administration of intravenous therapy is a common occurrence within the hospital setting. Routine replacement of administration sets has been advocated to reduce intravenous infusion contamination. If decreasing the frequency of changing intravenous administration sets does not increase infection rates, a change in practice could result in considerable cost savings. The objective of this review was to identify the optimal interval for the routine replacement of intravenous administration sets when infusate or parenteral nutrition (lipid and non-lipid) solutions are administered to people in hospital via central or peripheral venous catheters. We searched The Cochrane Central Register of Controlled Trials (CENTRAL), MEDLINE, CINAHL, EMBASE: all from inception to February 2004; reference lists of identified trials, and bibliographies of published reviews. We also contacted researchers in the field. We did not have a language restriction. We included all randomized or quasi-randomized controlled trials addressing the frequency of replacing intravenous administration sets when parenteral nutrition (lipid and non-lipid containing solutions) or infusions (excluding blood) were administered to people in hospital via a central or peripheral catheter. Two authors assessed all potentially relevant studies. We resolved disagreements between the two authors by discussion with a third author. We collected data for the outcomes; infusate contamination; infusate-related bloodstream infection; catheter contamination; catheter-related bloodstream infection; all-cause bloodstream infection and all-cause mortality. We identified 23 references for review. We excluded eight of these studies; five because they did not fit the inclusion criteria and three because of inadequate data. We extracted data from the remaining 15 references (13 studies) with 4783 participants. We conclude that there is no evidence that changing intravenous administration sets more often than every 96 hours

  17. Implementation strategy for achieving replacement level fertility.

    Science.gov (United States)

    1993-01-01

    The recommendation of the Bali Declaration on Population and Sustainable Development at the ESCAP regional conference was to adopt strategies for attaining replacement-level fertility of 2.1 or 2.2 children by 2010. East Asian countries, except Mongolia and the Democratic People's Republic of Korea, and the Southeast Asian countries Singapore and Thailand have already reached replacement-level fertility. Most larger Oceanic countries have also done so. Only South Asian Sri Lanka and southern India have attained replacement level. The following conditions slow or hinder the goal, but they do not provide an "absolute" barrier to fertility decline: social welfare schemes and old age security, son preference, lack of government family planning, poverty, relatively high mortality, low status of women, and education status. Theories of demographic transition have postulated that economic and social development initially brings a decline in mortality, and later brings a decline in fertility; and high fertility was an adaptation to high mortality. Policy gets caught in the lag between mortality and fertility decline. Eventually the cultural motives for high fertility are undercut by social and economic development. Although the generalization that economic growth slows fertility is true for South Asia, the correlation is uneven. Forceful government-sponsored family planning programs in Bangladesh and China may lead the way to strategies for decline in ESCAP region. A Thailand study suggested important factors were fundamental social change, the increased cost of children, cultural acceptance of birth control, a latent demand for fertility control, and government efforts in family planning. ESCAP countries have in common relatively high morality and inadequate public health programs, patriarchal structures, and limited female autonomy, poverty and landlessness, lack of community cohesiveness, and inadequate family planning programs. Weaknesses in programs are attributed to

  18. Media and Australia's replacement reactor project

    International Nuclear Information System (INIS)

    Keenan, Pamela

    2001-01-01

    In September 1997, the Commonwealth Government of Australia announced a proposal to build a replacement nuclear research reactor at Lucas Heights in Sydney. Extensive public consultation, parliamentary debate and independent reports were prepared to ensure that the new facility would meet strict international requirements, national safety and environmental standards, and performance specifications servicing the needs of Australia - for decades to come. On 6 June 2000, Argentine company INVAP SE was announced as the preferred tenderer. In July 2000 contracts were signed between INVAP and the Australian Nuclear Science and Technology Organisation for the construction the replacement reactor, due to be completed in 2005. In order to retain a strong local presence, INVAP undertook a joint venture with two of Australia's foremost heavy construction businesses. Briefly the new research reactor will be a replacement for the ageing Australian Reactor (HIFAR). Nuclear science and technology, in Australia, is no stranger to media controversy and misinformation. Understandably the announcement of a preferred tenderer followed by the signing of contracts, attracted significant national and international media attention. However in the minds of the media, the issue is far from resolved and is now a constant 'news story' in the Australian media. Baseless media stories have made claims that the project will cost double the original estimates; question the credibility of the contractors; and raise issues of international security. The project is currently linked with Australia's requirements for long term nuclear waste management and there has been an attempt to bring national Indigenous People's issues into play. Some of these issues have been profiled in the press internationally. So, just to set the record straight and give you an appropriate impression of what's 'really happening' I would like to highlight a few issues, how ANSTO dealt with these, and what was finally reported

  19. Procurement of replacement pressure vessels for MURR

    International Nuclear Information System (INIS)

    Meyer, W.A. Jr.; Edwards, C.B. Jr.; McKibben, J.C.; Schoone, A.R.

    1989-01-01

    The University of Missouri Research Reactor Facility (MURR) located in Columbia, Missouri, is the highest powered, highest steady-state flux university research reactor in the United States. The reactor is a 10-MW pressurized loop, in-pool-type, light-water-moderated, beryllium-reflected, flux trap reactor. MURR has a compact core (0.033 m 3 ) composed of eight fuel elements of the materials test reactor type arranged as an annular right circular cylinder between the inner and outer aluminum pressure vessels. Conservative engineering judgment resulted in the decision in 1988 to purchase new inner and outer pressure vessels. This paper details the difficulties encountered in procuring replacements for aluminum pressure vessels built to standards that are no longer applicable in attempting to meet nuclear standards that are not applicable to nonferrous material

  20. Segmental blood pressure after total hip replacement

    DEFF Research Database (Denmark)

    Gebuhr, Peter Henrik; Soelberg, M; Henriksen, Jens Henrik Sahl

    1992-01-01

    Twenty-nine patients due to have a total hip replacement had their systemic systolic and segmental blood pressures measured prior to operation and 1 and 6 weeks postoperatively. No patients had signs of ischemia. The segmental blood pressure was measured at the ankle and at the toes. A significant...... drop was found in all pressures 1 week postoperatively. The decrease followed the systemic pressure and was restored to normal after 6 weeks. In a group of six patients with preoperatively decreased ankle pressure, a significant transient further decrease in the ankle-toe gradient pressure was found...... on the operated side. None of the patients had symptoms from the lowered pressure. We conclude that in patients without signs of ischemia, the postoperative segmental pressure decrease is reversible and therefore not dangerous....

  1. Replacement of Swiss "Attestations de fonctions"

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Permanent Mission has informed CERN that the "attestations de fonctions" issued to certain members of the personnel and the "attestations" issued to their family members will gradually be replaced by P-type "cartes de légitimation" (see specimen copies below). This card’s name, together with its more contemporary design compared with old-style "Attestations" issued in the 1970s, will make the holder’s daily life much easier, e.g. when crossing borders, renting accommodation or setting up a telephone line. The Users Office (PH Department) and the Cards Office (HR Department), which are responsible for handling requests for "cartes de légitimation", will provide information in due course on how they intend to organise the exchange of "attestations" (priority will be given to residents of Switzerland, in parti...

  2. Sex hormone replacement in Turner syndrome

    DEFF Research Database (Denmark)

    Trolle, Christian; Hjerrild, Britta; Cleemann, Line Hartvig

    2012-01-01

    The cardinal features of Turner syndrome (TS) are short stature, congenital abnormalities, infertility due to gonadal dysgenesis, with sex hormone insufficiency ensuing from premature ovarian failure, which is involved in lack of proper development of secondary sex characteristics and the frequent...... osteoporosis seen in Turner syndrome. But sex hormone insufficiency is also involved in the increased cardiovascular risk, state of physical fitness, insulin resistance, body composition, and may play a role in the increased incidence of autoimmunity. Severe morbidity and mortality affects females with Turner...... syndrome. Recent research emphasizes the need for proper sex hormone replacement therapy (HRT) during the entire lifespan of females with TS and new hypotheses concerning estrogen receptors, genetics and the timing of HRT offers valuable new information. In this review, we will discuss the effects...

  3. Material Science in Cervical Total Disc Replacement

    Science.gov (United States)

    Pham, Martin H.; Mehta, Vivek A.; Tuchman, Alexander; Hsieh, Patrick C.

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation. PMID:26523281

  4. Material Science in Cervical Total Disc Replacement

    Directory of Open Access Journals (Sweden)

    Martin H. Pham

    2015-01-01

    Full Text Available Current cervical total disc replacement (TDR designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti, and cobalt-chrome (CoCr. These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation.

  5. NIF Laser Line Replaceable Units (LRUs)

    International Nuclear Information System (INIS)

    Larson, D W

    2003-01-01

    The National Ignition Facility (NIF) is designed with its high value optical systems in cassettes called Line Replaceable Units (LRUs). Virtually all of the NIF's active components are assembled in one of the ∼4000 electrical and optical LRUs that serve between two and eight of NIF's 192 laser beam lines. Many of these LRUs are optomechanical assemblies that are roughly the size of a telephone booth. The primary design challenges for this hardware include meeting stringent mechanical precision, stability and cleanliness requirements. Pre-production units of each LRU type have been fielded on the first bundle of NIF and used to demonstrate that NIF meets its performance objectives. This presentation provides an overview of the NIF LRUs, their design and production plans for building out the remaining NIF bundles

  6. Contribution to optimization of preventive replacement

    International Nuclear Information System (INIS)

    Legat, V.; Zaludova, A.H.; Cervenka, V.; Jurca, V.

    1996-01-01

    The paper presents a method for determining the optimal interval for preventive maintenance/replacement using either an age-based or diagnostic-based renewal strategy. For the case of a finite-time horizon, for which the computations are complicated, a simple formula is proposed for modifying the commonly used inifinite-time solution so that it gives a good approximation to the exact finite-time solution. Examples demonstrate that the method is sufficiently accurate and simple in practice for typical engineering components with Weibull life distributions and for a reasonable range of the cost factor (ratio of unit corrective to unit preventive maintenance costs). This paper investigates the problem of the accuracy of the results compared to the exact, finite-time solution for a selected matrix of time-to failure Weibull shape parameters and cost factors commonly occurring in technical practice. Applications offer substantial benefits to both manufacturer and user of technical equipment

  7. Saildrone fleet could help replace aging buoys

    Science.gov (United States)

    Voosen, Paul

    2018-03-01

    In April, two semiautonomous drones, developed by Saildrone, a marine tech startup based in Alameda, California, in close collaboration with the National Oceanic and Atmospheric Administration in Washington, D.C., are set to return from an 8-month tour of the Pacific Ocean. This the first scientific test for the drones, which are powered only by the wind and sun, in the Pacific Ocean. The voyage is an important step in showing that such drones, carrying 15 different sensors, could help replace an aging and expensive array of buoys that are the main way scientists sniff out signs of climate-disrupting El Niño events. If successful, scientists envision fleets of similar drones spreading across the ocean, inviting thoughts of what it could be like to do oceanography without a ship.

  8. Material Science in Cervical Total Disc Replacement.

    Science.gov (United States)

    Pham, Martin H; Mehta, Vivek A; Tuchman, Alexander; Hsieh, Patrick C

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation.

  9. Contact replacement for NMR resonance assignment.

    Science.gov (United States)

    Xiong, Fei; Pandurangan, Gopal; Bailey-Kellogg, Chris

    2008-07-01

    Complementing its traditional role in structural studies of proteins, nuclear magnetic resonance (NMR) spectroscopy is playing an increasingly important role in functional studies. NMR dynamics experiments characterize motions involved in target recognition, ligand binding, etc., while NMR chemical shift perturbation experiments identify and localize protein-protein and protein-ligand interactions. The key bottleneck in these studies is to determine the backbone resonance assignment, which allows spectral peaks to be mapped to specific atoms. This article develops a novel approach to address that bottleneck, exploiting an available X-ray structure or homology model to assign the entire backbone from a set of relatively fast and cheap NMR experiments. We formulate contact replacement for resonance assignment as the problem of computing correspondences between a contact graph representing the structure and an NMR graph representing the data; the NMR graph is a significantly corrupted, ambiguous version of the contact graph. We first show that by combining connectivity and amino acid type information, and exploiting the random structure of the noise, one can provably determine unique correspondences in polynomial time with high probability, even in the presence of significant noise (a constant number of noisy edges per vertex). We then detail an efficient randomized algorithm and show that, over a variety of experimental and synthetic datasets, it is robust to typical levels of structural variation (1-2 AA), noise (250-600%) and missings (10-40%). Our algorithm achieves very good overall assignment accuracy, above 80% in alpha-helices, 70% in beta-sheets and 60% in loop regions. Our contact replacement algorithm is implemented in platform-independent Python code. The software can be freely obtained for academic use by request from the authors.

  10. Trenchless Replacement of Buried Cable Lines

    Directory of Open Access Journals (Sweden)

    Hans-Joachim Bayer

    2007-01-01

    Full Text Available An enormous amount of underground electricity and telecommunication cables have been worn over the time with technical defects or need capacity increases. Thus, new lines need to be installed. In urban areas, even in smaller communities and in natural reserves, open trenching is difficult and often not permitted.In response, new patented methods of trenchless cable replacement using the HDD equipment have been developed by the TT Group. The new technology is called “Wash-over-cable-replacement” and applies specially designed drill heads, cutting around the old cable string in various configurations (completely closed, U-shape or S-shape embracing, depending to the coating type of the old cable. This special cable replacement drill head separates the cable from the surrounding adhesive soil or the sand bedding by creating a very small annular space around the cable thus enabling the pulling or dragging out of the old cable section between the start and the exit pit. After the old cable has been loosened from the surrounding soil by means of the wash over process and pulled out, the new cable can be smoothly pulled into the void using the drill rods and embedding the new cable in a rich bed of Bentonite.The wash-over drill heads are slim and have inner and outer nozzles for Bentonite and bits to handle roots, pebbles, gravel and the like. These drill heads perform very quickly (up to 3 meters per minute to effectively wash over existing cables without damaging the cable coating and prepare the ground for a fast new laying of a new cable in the existing line. Network owners also benefit from the fact that new geodetic or topographic surveys and documentations of the new cable are not necessary. Only the documents, remarks, technical codes and existing geodetic data need to be updated.The paper will outline the technological background and include several practical job examples.

  11. Femoral component rotation in patellofemoral joint replacement.

    Science.gov (United States)

    van Jonbergen, Hans-Peter W; Westerbeek, Robin E

    2018-06-01

    Clinical outcomes in patellofemoral joint replacement may be related to femoral component rotation. Assessment of rotational alignment is however difficult as patients with isolated patellofemoral osteoarthritis often have trochlear dysplasia. The use of the medial malleolus as a landmark to guide rotation has been suggested. The purpose of our study was to evaluate this technique with regard to femoral component rotation, and to correlate rotation with clinical outcomes at one-year follow-up. Forty-one knees in 39 patients had patellofemoral joint replacement using the Zimmer Gender-Solutions patellofemoral prosthesis. Intraoperatively, we determined femoral component rotational alignment using an extramedullary rod aimed at the inferior tip of the medial malleolus. Postoperatively, we measured the angle between the femoral component and the anatomical transepicondylar axis using CT. The amount of rotation was correlated with clinical outcomes at one-year follow-up. Forty knees in 38 patients were available for one-year follow-up. Mean femoral component rotation relative to the anatomical transepicondylar axis was 1.4° external rotation (range, -3.8 to 5.7°). We found no statistically significant correlation between femoral component rotation and change from baseline KOOS subscales at one-year follow-up. Our findings show that when using the medial malleolus as a landmark to guide rotation, the femoral component of the patellofemoral prosthesis was oriented in external rotation relative to the anatomical transepicondylar axis in 80% of knees. Our study did not show a relation between the amount of external rotation and clinical outcomes. Level III. Copyright © 2018 Elsevier B.V. All rights reserved.

  12. Neonatal varicella pneumonia, surfactant replacement therapy

    Directory of Open Access Journals (Sweden)

    Mousa Ahmadpour-kacho

    2015-12-01

    Full Text Available Background: Chickenpox is a very contagious viral disease that caused by varicella-zoster virus, which appears in the first week of life secondary to transplacental transmission of infection from the affected mother. When mother catches the disease five days before and up to two days after the delivery, the chance of varicella in neonate in first week of life is 17%. A generalized papulovesicular lesion is the most common clinical feature. Respiratory involvement may lead to giant cell pneumonia and respiratory failure. The mortality rate is up to 30% in the case of no treatment, often due to pneumonia. Treatment includes hospitalization, isolation and administration of intravenous acyclovir. The aim of this case report is to introduce the exogenous surfactant replacement therapy after intubation and mechanical ventilation for respiratory failure in neonatal chickenpox pneumonia and respiratory distress. Case Presentation: A seven-day-old neonate boy was admitted to the Neonatal Intensive Care Unit at Amirkola Children’s Hospital, Babol, north of Iran, with generalized papulovesicular lesions and respiratory distress. His mother has had a history of Varicella 4 days before delivery. He was isolated and given supportive care, intravenous acyclovir and antibiotics. On the second day, he was intubated and connected to mechanical ventilator due to severe pneumonia and respiratory failure. Because of sever pulmonary involvement evidenced by Chest X-Ray and high ventilators set-up requirement, intratracheal surfactant was administered in two doses separated by 12 hours. He was discharged after 14 days without any complication with good general condition. Conclusion: Exogenous surfactant replacement therapy can be useful as an adjunctive therapy for the treatment of respiratory failure due to neonatal chickenpox.

  13. Replacement divider plate performance under LOCA loading

    International Nuclear Information System (INIS)

    Huynk, H.M.; MClellan, G.H.; Schneider, W.G.

    1997-01-01

    A primary divider plate in a nuclear steam generator is required to perform its partitioning function with a minimum of cross leakage, without degradation in operating performance and without loss of structural integrity resulting from normal and accident loading. The design of the replacement divider plate for normal operating conditions is discussed in some detail in reference 1 and 2. This paper describes the structural response of the replacement divider plate to the severe loading resulting from a burst primary pipe. The loads for which the divider plate structural performance must be evaluated are mild to severe differential pressure transients resulting from several postulated sizes and types of pipe break scenarios. In the unlikely event of a severe Loss of Coolant Accident (LOCA) the divider plate or parts thereof must not exit the steam generator nor completely block the outlet nozzle. For the milder LOCA loads, the integrity of the divider plate and seat bars must be maintained. Analysis for the milder LOCA loads was carried out employing a conservative approach which ignores the actual interaction between the structure and the primary fluid. For these load cases it was shown that the divider plate does not become disengaged from the seat bars. For the more severe pipe breaks, the thermal-hydraulic analysis was coupled iteratively with the structural analysis, thereby taking into account divider plate deformation, in order to obtain a better prediction of the behaviour of the divider plate. In this manner substantial reduction in divider plate response to the more severe LOCA loading was achieved. It has been shown that, for the case of a postulated large LOCA (100% reactor inlet header), the disengagement of the divider plate from the seat bars resulted in an opening smaller than 1% of the divider plate area. (author)

  14. Age replacement policy based on imperfect repair with random probability

    International Nuclear Information System (INIS)

    Lim, J.H.; Qu, Jian; Zuo, Ming J.

    2016-01-01

    In most of literatures of age replacement policy, failures before planned replacement age can be either minimally repaired or perfectly repaired based on the types of failures, cost for repairs and so on. In this paper, we propose age replacement policy based on imperfect repair with random probability. The proposed policy incorporates the case that such intermittent failure can be either minimally repaired or perfectly repaired with random probabilities. The mathematical formulas of the expected cost rate per unit time are derived for both the infinite-horizon case and the one-replacement-cycle case. For each case, we show that the optimal replacement age exists and is finite. - Highlights: • We propose a new age replacement policy with random probability of perfect repair. • We develop the expected cost per unit time. • We discuss the optimal age for replacement minimizing the expected cost rate.

  15. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Science.gov (United States)

    D'Emic, Michael D; Whitlock, John A; Smith, Kathlyn M; Fisher, Daniel C; Wilson, Jeffrey A

    2013-01-01

    Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs.

  16. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Directory of Open Access Journals (Sweden)

    Michael D D'Emic

    Full Text Available BACKGROUND: Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. METHODOLOGY/PRINCIPAL FINDINGS: We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days. Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. CONCLUSIONS/SIGNIFICANCE: Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size, and derived titanosaurs and

  17. Status of the beryllium replacement project

    Energy Technology Data Exchange (ETDEWEB)

    Dimayuga, I. [Atomic Energy of Canada, Chalk River, Ontario (Canada); Corcoran, E. [Royal Military College of Canada, Kingston, Ontario (Canada); Daniels, T. [Ontario Power Generation, Pickering, Ontario (Canada); Harmsen, J. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada); Lu, E. [Bruce Power, Tiverton, Ontario (Canada); Onderwater, T.; Palleck, S. [General Electric- Hitachi, Wilmington, North Carolina (United States); Pant, A. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada)

    2013-07-01

    Currently, beryllium (Be) is used as the filler metal for brazing appendages on the sheaths of CANDU® fuel elements. Because of its toxicity, occupational exposure limits for Be are being reduced to very low levels, resulting in significant challenges to CANDU® fuel fabricators. The CANDU® Owners Group (COG) initiated a test program to identify a filler material to replace Be and confirm that the brazed joints meet the established technical requirements for CANDU® fuel. Together with eliminating health risks associated with the use of Be, the industry needs to be assured that continuation of fuel supply remains unaffected and that fuel fabrication processes continue to comply with health and safety standards. A literature survey of studies on brazing and joining of Zircaloy identified potential filler materials that can meet or exceed existing design requirements of the brazed joint, including the required mechanical, microstructural, corrosion resistance, and irradiation properties equivalent to those obtained with Be as braze material. Candidate materials were evaluated against several criteria, including manufacturability, melting point, wettability, mechanical properties, corrosion resistance, effect on neutron economy, potential activation products, and interaction with fuel channels and other related disciplines. This exercise resulted in a list of promising candidate materials that were recommended for the first phase of testing. These materials include stainless steel (304 or 316), Al-Si, Ni-P, and Zr-Mn alloys. To allow a CANDU® utility have sufficient confidence in considering implementation of a different braze filler material, a Be Replacement Test Program, involving out-reactor and in-reactor tests, is being undertaken as a collaborative endeavour by the Canadian nuclear industry. The out-reactor tests consist of: a constructability assessment to determine the material’s suitability with current fuel manufacturing methods; evaluation of

  18. Surfactant replacement therapy--economic impact.

    Science.gov (United States)

    Pejaver, R K; al Hifzi, I; Aldussari, S

    2001-06-01

    Surfactant replacement is an effective treatment for neonatal respiratory distress syndrome. (RDS). As widespread use of surfactant is becoming a reality, it is important to assess the economic implications of this new form of therapy. A comparison study was carried out at the Neonatal Intensive Care Unit (NICU) of Northwest Armed Forces Hospital, Saudi Arabia. Among 75 infants who received surfactant for RDS and similar number who were managed during time period just before the surfactant was available, but by set criteria would have made them eligible for surfactant. All other management modalities except surfactant were the same for all these babies. Based on the intensity of monitoring and nursing care required by the baby, the level of care was divided as: Level IIIA, IIIB, Level II, Level I. The cost per day per bed for each level was calculated, taking into account the use of hospital immovable equipment, personal salaries of nursing, medical, ancillary staff, overheads and maintenance, depreciation and replacement costs. Medications used, procedures done, TPN, oxygen, were all added to individual patient's total expenditure. 75 infants in the Surfactant group had 62 survivors. They spent a total of 4300 days in hospital. (av 69.35) Out of which 970 d (av 15.65 per patient) were ventilated days. There were 56 survivors in the non-surfactant group of 75. They had spent a total of 5023 days in the hospital (av 89.69/patient) out of which 1490 were ventilated days (av 26.60 d). Including the cost of surfactant (two doses), cost of hospital stay for each infant taking the average figures of stay would be SR 118, 009.75 per surfactant treated baby and SR 164, 070.70 per non-surfactant treated baby. The difference of 46,061 SR is 39.03% more in non-surfactant group. One Saudi rial = 8 Rs (approx at the time study was carried out.) Medical care cost varies from place to place. However, it is definitely cost-effective where surfactant is concerned. Quality adjusted

  19. MMIC Replacement for Gunn Diode Oscillators

    Science.gov (United States)

    Crowe, Thomas W.; Porterfield, David

    2011-01-01

    An all-solid-state replacement for high-frequency Gunn diode oscillators (GDOs) has been proposed for use in NASA s millimeter- and submillimeter-wave sensing instruments. Highly developed microwave oscillators are used to achieve a low-noise and highly stable reference signal in the 10-40-GHz band. Compact amplifiers and high-power frequency multipliers extend the signal to the 100-500-GHz band with minimal added phase noise and output power sufficient for NASA missions. This technology can achieve improved output power and frequency agility, while maintaining phase noise and stability comparable to other GDOs. Additional developments of the technology include: a frequency quadrupler to 145 GHz with 18 percent efficiency and 15 percent fixed tuned bandwidth; frequency doublers featuring 124, 240, and 480 GHz; an integrated 874-GHz subharmonic mixer with a mixer noise temperature of 3,000 K DSB (double sideband) and mixer conversion loss of 11.8 dB DSB; a high-efficiency frequency tripler design with peak output power of 23 mW and 14 mW, and efficiency of 16 and 13 percent, respectively; millimeter-wave integrated circuit (MMIC) power amplifiers to the 30-40 GHz band with high DC power efficiency; and an 874-GHz radiometer suitable for airborne observation with state-of-the-art sensitivity at room temperature and less than 5 W of total power consumption.

  20. Hormone replacement therapy in cancer survivors: Utopia?

    Science.gov (United States)

    Angioli, Roberto; Luvero, Daniela; Armento, Grazia; Capriglione, Stella; Plotti, Francesco; Scaletta, Giuseppe; Lopez, Salvatore; Montera, Roberto; Gatti, Alessandra; Serra, Giovan Battista; Benedetti Panici, Pierluigi; Terranova, Corrado

    2018-04-01

    As growing of old women population, menopausal women will also increase: an accurate estimation of postmenopausal population is an essential information for health care providers considering that with aging, the incidence of all cancers is expected to increase. Hormone replacement therapy (HRT) has proven to be highly effective in alleviating menopausal symptoms such as hot flashes, night sweats, dyspareunia, sexual disorders, and insomnia and in preventing osteoporosis. According to preclinical data, estrogen and progesterone are supposed to be involved in the induction and progression of breast and endometrial cancers. Similarly, in epithelial ovarian cancer (EOC), the pathogenesis seems to be at least partly hormonally influenced. Is HRT in gynecological cancer survivors possible? The literature data are controversial. Many clinicians remain reluctant to prescribe HRT for these patients due to the fear of relapse and the risk to develop coronary heart disease or breast cancer. Before the decision to use HRT an accurate counselling should be mandatory in order to individualizing on the basis of potential risks and benefits, including a close follow-up. Nevertheless, we do believe that with strong informed consent doctors may individually consider to prescribe some course of HRT in order to minimize menopausal symptoms and disease related to hormonal reduction. Copyright © 2018 Elsevier B.V. All rights reserved.

  1. Replacement of Swiss "Attestations de fonctions"

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Permanent Mission has informed CERN that the "attestations de fonctions" issued to certain members of the personnel and the "attestations" issued to their family members will gradually be replaced by P-type "cartes de légitimation" (see specimen copies in the printed Bulletin). This card’s name, together with its more contemporary design compared with old-style "Attestations" issued in the 1970s, will make the holder’s daily life much easier, e.g. when crossing borders, renting accommodation or setting up a telephone line. The Users Office (PH Department) and the Cards Office (HR Department), which are responsible for handling requests for "cartes de légitimation", will provide information in due course on how they intend to organise the exchange of "attestations" (priority will be given to residents of Switzerland, in particular those requiring a visa for the Schengen area). In this context, we remind you that the Swiss Permanent Mission is systematically in...

  2. Flash-Aware Page Replacement Algorithm

    Directory of Open Access Journals (Sweden)

    Guangxia Xu

    2014-01-01

    Full Text Available Due to the limited main memory resource of consumer electronics equipped with NAND flash memory as storage device, an efficient page replacement algorithm called FAPRA is proposed for NAND flash memory in the light of its inherent characteristics. FAPRA introduces an efficient victim page selection scheme taking into account the benefit-to-cost ratio for evicting each victim page candidate and the combined recency and frequency value, as well as the erase count of the block to which each page belongs. Since the dirty victim page often contains clean data that exist in both the main memory and the NAND flash memory based storage device, FAPRA only writes the dirty data within the victim page back to the NAND flash memory based storage device in order to reduce the redundant write operations. We conduct a series of trace-driven simulations and experimental results show that our proposed FAPRA algorithm outperforms the state-of-the-art algorithms in terms of page hit ratio, the number of write operations, runtime, and the degree of wear leveling.

  3. Process optimized minimally invasive total hip replacement

    Directory of Open Access Journals (Sweden)

    Philipp Gebel

    2012-02-01

    Full Text Available The purpose of this study was to analyse a new concept of using the the minimally invasive direct anterior approach (DAA in total hip replacement (THR in combination with the leg positioner (Rotex- Table and a modified retractor system (Condor. We evaluated retrospectively the first 100 primary THR operated with the new concept between 2009 and 2010, regarding operation data, radiological and clinical outcome (HOOS. All surgeries were perfomed in a standardized operation technique including navigation. The average age of the patients was 68 years (37 to 92 years, with a mean BMI of 26.5 (17 to 43. The mean time of surgery was 80 min. (55 to 130 min. The blood loss showed an average of 511.5 mL (200 to 1000 mL. No intra-operative complications occurred. The postoperative complication rate was 6%. The HOOS increased from 43 points pre-operatively to 90 (max 100 points 3 months after surgery. The radiological analysis showed an average cup inclination of 43° and a leg length discrepancy in a range of +/- 5 mm in 99%. The presented technique led to excellent clinic results, showed low complication rates and allowed correct implant positions although manpower was saved.

  4. Replacement strategy for obsolete plant computers

    International Nuclear Information System (INIS)

    Schaefer, J.P.

    1985-01-01

    The plant computers of the first generation of larger nuclear power plants are reaching the end of their useful life time with respect to the hardware. The software would be no reason for a system exchange but new tasks for the supervisory computer system, availability questions of maintenance personnel and spare parts and the demand for improved operating procedures for the computer users have stimulated the considerations on how to exchange a computer system in a nuclear power plant without extending plant outage times due to exchange works. In the Federal Republic of Germany the planning phase of such backfitting projects is well under way, some projects are about to be implemented. The base for these backfitting projects is a modular supervisory computer concept which has been designated for the new line of KWU PWR's. The main characteristic of this computer system is the splitting of the system into a data acquisition level and a data processing level. This principle allows an extension of the processing level or even repeated replacements of the processing computers. With the existing computer system still in operation the new system can be installed in a step-by-step procedure. As soon as the first of the redundant process computers of the data processing level is in operation and the data link to the data acquisition computers is established the old computer system can be taken out of service. Then the back-up processing computer can be commissioned to complete the new system. (author)

  5. Can smartwatches replace smartphones for posture tracking?

    Science.gov (United States)

    Mortazavi, Bobak; Nemati, Ebrahim; VanderWall, Kristina; Flores-Rodriguez, Hector G; Cai, Jun Yu Jacinta; Lucier, Jessica; Naeim, Arash; Sarrafzadeh, Majid

    2015-10-22

    This paper introduces a human posture tracking platform to identify the human postures of sitting, standing or lying down, based on a smartwatch. This work develops such a system as a proof-of-concept study to investigate a smartwatch's ability to be used in future remote health monitoring systems and applications. This work validates the smartwatches' ability to track the posture of users accurately in a laboratory setting while reducing the sampling rate to potentially improve battery life, the first steps in verifying that such a system would work in future clinical settings. The algorithm developed classifies the transitions between three posture states of sitting, standing and lying down, by identifying these transition movements, as well as other movements that might be mistaken for these transitions. The system is trained and developed on a Samsung Galaxy Gear smartwatch, and the algorithm was validated through a leave-one-subject-out cross-validation of 20 subjects. The system can identify the appropriate transitions at only 10 Hz with an F-score of 0.930, indicating its ability to effectively replace smart phones, if needed.

  6. MRI after patellofemoral replacement: The preserved compartments

    International Nuclear Information System (INIS)

    Heyse, Thomas J.; Figiel, Jens; Hähnlein, Ulrike; Timmesfeld, Nina; Lakemeier, Stefan; Schofer, Markus D.; Fuchs-Winkelmann, Susanne; Efe, Turgay

    2012-01-01

    Introduction: The aim of this study was to assess the reproducibility of magnet resonance imaging (MRI) analysis of preserved anatomic structures of the knee after patellofemoral replacement (PFR). It was hypothesized that evaluation of cartilage, ligaments, meniscus and tendons would result in high inter-observer reliability after PFR. Material and methods: MRI, tailored to reduce metallic artefacts of the knee, after PFR was performed in seven patients. Two independent investigators evaluated cartilage, menisci, collateral and cruciate ligaments, the quadriceps and patellar tendons and the presence of joint effusion. The reviewers used a five-point scale to give a degree of confidence to their evaluation of each parameter. Inter-observer reliability was determined by calculation of Cohen's Kappas. Results: Artefact provoked by the implants was not observed. For all assessed structures, there was excellent inter-observer reliability, with high Cohen's Kappas. There were also high levels of inter-observer agreement and observer confidence in the evaluation of cartilage, meniscus, tendons, ligaments and joint effusion. Conclusion: Tailored MRI allows reproducible analysis of the preserved knee joint structures after PFR. It might prove helpful in assessment of painful knee joints after PFR

  7. MRI after patellofemoral replacement: The preserved compartments

    Energy Technology Data Exchange (ETDEWEB)

    Heyse, Thomas J., E-mail: heyse@med.uni-marburg.de [Department of Orthopedics and Rheumatology, University Hospital Marburg, Baldingerstrasse, 35043 Marburg (Germany); Figiel, Jens [Department of Radiology, University Hospital Marburg, Marburg (Germany); Hähnlein, Ulrike [Department of Orthopedics and Rheumatology, University Hospital Marburg, Baldingerstrasse, 35043 Marburg (Germany); Timmesfeld, Nina [Institute for Medical Biometry and Epidemiology, Marburg (Germany); Lakemeier, Stefan; Schofer, Markus D.; Fuchs-Winkelmann, Susanne; Efe, Turgay [Department of Orthopedics and Rheumatology, University Hospital Marburg, Baldingerstrasse, 35043 Marburg (Germany)

    2012-09-15

    Introduction: The aim of this study was to assess the reproducibility of magnet resonance imaging (MRI) analysis of preserved anatomic structures of the knee after patellofemoral replacement (PFR). It was hypothesized that evaluation of cartilage, ligaments, meniscus and tendons would result in high inter-observer reliability after PFR. Material and methods: MRI, tailored to reduce metallic artefacts of the knee, after PFR was performed in seven patients. Two independent investigators evaluated cartilage, menisci, collateral and cruciate ligaments, the quadriceps and patellar tendons and the presence of joint effusion. The reviewers used a five-point scale to give a degree of confidence to their evaluation of each parameter. Inter-observer reliability was determined by calculation of Cohen's Kappas. Results: Artefact provoked by the implants was not observed. For all assessed structures, there was excellent inter-observer reliability, with high Cohen's Kappas. There were also high levels of inter-observer agreement and observer confidence in the evaluation of cartilage, meniscus, tendons, ligaments and joint effusion. Conclusion: Tailored MRI allows reproducible analysis of the preserved knee joint structures after PFR. It might prove helpful in assessment of painful knee joints after PFR.

  8. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  9. 3D Model of Surfactant Replacement Therapy

    Science.gov (United States)

    Grotberg, James; Tai, Cheng-Feng; Filoche, Marcel

    2015-11-01

    Surfactant Replacement Therapy (SRT) involves instillation of a liquid-surfactant mixture directly into the lung airway tree. Though successful in neonatal applications, its use in adults had early success followed by failure. We present the first mathematical model of 3D SRT where a liquid plug propagates through the tree from forced inspiration. In two separate modeling steps, the plug first deposits a coating film on the airway wall which subtracts from its volume, a ``coating cost''. Then the plug splits unevenly at the airway bifurcation due to gravity. The steps are repeated until a plug ruptures or reaches the tree endpoint alveoli/acinus. The model generates 3D images of the resulting acinar distribution and calculates two global indexes, efficiency and homogeneity. Simulating published literature, the earlier successful adult SRT studies show comparatively good index values, while the later failed studies do not. Those unsuccessful studies used smaller dose volumes with higher concentration mixtures, apparently assuming a well mixed compartment. The model shows that adult lungs are not well mixed in SRT due to the coating cost and gravity effects. Returning to the higher dose volume protocols could save many thousands of lives annually in the US. Supported by NIH Grants HL85156, HL84370 and Agence Nationale de la Recherche, ANR no. 2010-BLAN-1119-05.

  10. Mechanical versus bioprosthetic aortic valve replacement.

    Science.gov (United States)

    Head, Stuart J; Çelik, Mevlüt; Kappetein, A Pieter

    2017-07-21

    Mechanical valves used for aortic valve replacement (AVR) continue to be associated with bleeding risks because of anticoagulation therapy, while bioprosthetic valves are at risk of structural valve deterioration requiring reoperation. This risk/benefit ratio of mechanical and bioprosthetic valves has led American and European guidelines on valvular heart disease to be consistent in recommending the use of mechanical prostheses in patients younger than 60 years of age. Despite these recommendations, the use of bioprosthetic valves has significantly increased over the last decades in all age groups. A systematic review of manuscripts applying propensity-matching or multivariable analysis to compare the usage of mechanical vs. bioprosthetic valves found either similar outcomes between the two types of valves or favourable outcomes with mechanical prostheses, particularly in younger patients. The risk/benefit ratio and choice of valves will be impacted by developments in valve designs, anticoagulation therapy, reducing the required international normalized ratio, and transcatheter and minimally invasive procedures. However, there is currently no evidence to support lowering the age threshold for implanting a bioprosthesis. Physicians in the Heart Team and patients should be cautious in pursuing more bioprosthetic valve use until its benefit is clearly proven in middle-aged patients. Published on behalf of the European Society of Cardiology. All rights reserved. © The Author 2017. For permissions, please email: journals.permissions@oup.com.

  11. [SECOT consensus on painful knee replacement].

    Science.gov (United States)

    Vaquero, J; Macule, F; Bello, S; Chana, F; Forriol, F

    2013-01-01

    The opinions of 21 experts in knee surgery were evaluated in this study, using a DELPHI questionnaire method in two successive rounds, on 64 controversial scenarios that covered both the diagnosis and possible treatment of painful knee replacements. The level of consensus was significantly unanimous in 42 items and of the design in 5, with no agreement in 17 of the questions presented. light of the published scientific evidence, the surgeons who took part showed to have a notable level of information on the most effective diagnostic tests, although, it should be pointed out that there was a lack of confidence in the possibility of ruling out an infection when the erythrocyte sedimentation rate and the C-reactive protein were within normal values, which have been demonstrated in the literature to have a high negative predictive value As regards the treatments to employ in the different situations, the responses of the expert panel were mainly in agreement with the data in the literature. The conclusions of this consensus may help other surgeons when they are faced with a painful knee prosthesis. Copyright © 2013 SECOT. Published by Elsevier Espana. All rights reserved.

  12. Which technologies to replace gamma radiography?

    International Nuclear Information System (INIS)

    Zani-Demange, M.L.; Chauveau, D.

    2012-01-01

    Gamma radiography with iridium source is largely used in the industrial sector for the control of welds, tubes and pressure vessels as well as for monitoring corrosion. Hazards due to the handling of ionizing radiation sources (Ir 192 ) and constraints due to a more and more demanding regulations call for alternative methods. The French 'Institut de soudure' has led a 4-year long study (Alter-X project) and has identified 3 alternative methods for the iridium gamma radiography: -) the TOFD (Time Of Flight Diffraction) which is based on the analysis of the diffraction of ultrasound waves on the edges of defects; -) phased array ultrasound which is based on a series of elementary sensors that can be handled in an individual manner by specific electronics, the sweeping is no more manual but electronic and enables the operator to localize and size defects deep under the surface; -) digit radiography that is a common radiography in which the film is replaced by a re-usable phosphorus screen that is more sensitive and can be easily digitalized and has no need for a chemical treatment to be read. Digit radiography used with Se 75 (another gamma emitter) gives comparable or even better results than with Ir 192 but with a dose rate cut by half at least. (A.C.)

  13. Step by step replacement of aging electronic equipment: a way to maintain high capacity factors

    International Nuclear Information System (INIS)

    Wilder, O.

    1990-01-01

    The paper discusses the following topics: replacement concept, aging, replacement, strategy and the Swedish situation. The replacement of important central systems started already 1986 in Oskarshamn 1

  14. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1990-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. The methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and is expected to continue operation for at least and additional 25 years. Aging evaluations are in progress to address additional replacements that may be needed during this period

  15. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1989-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. Methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and will continue operation for perhaps another 20 years. Aging evaluations are in program to address additional replacements that may be needed during this extended time period. 3 figs

  16. A Bayesian perspective on age replacement with minimal repair

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Yeh, R.H.; Lin, Y.-B.; Juang, M.-G.

    1999-01-01

    In this article, a Bayesian approach is developed for determining an optimal age replacement policy with minimal repair. By incorporating minimal repair, planned replacement, and unplanned replacement, the mathematical formulas of the expected cost per unit time are obtained for two cases - the infinite-horizon case and the one-replacement-cycle case. For each case, we show that there exists a unique and finite optimal age for replacement under some reasonable conditions. When the failure density is Weibull with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal age replacement policy. Further, various special cases are discussed in detail. Finally, a numerical example is given

  17. THE REPLACEMENT-RENEWAL OF INDUSTRIAL EQUIPMENTS. THE MAPI FORMULAS

    Directory of Open Access Journals (Sweden)

    Meo Colombo Carlotta

    2010-07-01

    Full Text Available Since the production has been found to be an economical means for satisfying human wants, this process requires a complex industrial organization together with a large investment in equipments, plants and productive systems. These productive systems are employed to alter the physical environment and create consumer goods. As a result, they are consumed or become obsolete, inadequate, or otherwise candidates for replacement. When replacement is being considered, two assets must be evaluated: the present asset, the defender and its potential replacement, the challenger. Since the success of an industrial organization depends upon profit, replacement should generally occur if an economic advantage will result. Whatever the reason leading to the consideration of replacement, the analysis and decisions must be based upon estimates of what will occur in the future. In this paper we present the Mapi algorithm as a procedure for evaluating investments or for analyzing replacement opportunities.

  18. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1989-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab

  19. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1990-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor

  20. Principles of human joint replacement design and clinical application

    CERN Document Server

    Buechel, Frederick F

    2015-01-01

    This book is written for the users and designers of joint replacements. In its second extended edition it conveys to the reader the knowledge accumulated by the authors during their forty year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter describes the design methodology now required for joint replacement in the USA and EU countries. The remaining chapters provide a history of joint replacement, an evaluation of earlier and current devices and sample case hist...

  1. Principles of Human Joint Replacement Design and Clinical Application

    CERN Document Server

    Buechel, Frederick F

    2012-01-01

    Drs. Buechel, an orthopaedic surgeon, and Pappas, a professor of Mechanical Engineering, are the designers of several successful joint replacement systems. The most well-known of these is the pioneering LCS knee replacement. They have written this book for the users and designers of joint replacements. It is an attempt to convey to the reader the knowledge accumulated by the authors during their thirty five year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter de...

  2. Excellence in fleet combat replacement squadrons: predicting carrier qualification success

    OpenAIRE

    Smith, Martin P.

    1988-01-01

    This thesis presents a two-part analysis of excellence criteria for fleet combat replacement squadrons. Part one focuses on the qualitative issues and management techniques identified in outstanding fleet combat replacement squadrons. Part two develops and presents a regression model for predicting a fleet replacement squadron pilot's carrier qualification grade. The model was derived using standard linear regression techniques and the SPSSx software package of the Naval Postgraduate School. ...

  3. Mitochondrial replacement techniques: egg donation, genealogy and eugenics

    OpenAIRE

    Palacios-Gonz?lez, C?sar

    2016-01-01

    Several objections against the morality of researching or employing mitochondrial replacement techniques have been advanced recently. In this paper, I examine three of these objections and show that they are found wanting. First I examine whether mitochondrial replacement techniques, research and clinical practice, should not be carried out because of possible harms to egg donors. Next I assess whether mitochondrial replacement techniques should be banned because they could affect the study o...

  4. An abstract machine model of dynamic module replacement

    OpenAIRE

    Walton, Chris; Kırlı, Dilsun; Gilmore, Stephen

    2000-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement for the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection. We show how the operation of module replacement could be applied to other garbage-collected languages such as Java.

  5. The use of adaptive equipment following total knee replacement

    OpenAIRE

    McNaught, Jamie; Paul, Lorna

    2015-01-01

    Introduction: This study evaluates the need for adaptive equipment following total knee replacement. There are no recent studies to guide occupational therapists in the optimum time adaptive equipment is required following total knee replacement.\\ud \\ud Method: A non-experimental, concurrent mixed methods approach was used. The study population was patients attending for total knee replacement at a large general hospital. Outcome measures were the Oxford Knee Score, the United Kingdom Functio...

  6. The cost function for the preventive - maintenance replacement problem

    OpenAIRE

    Vilaplana, Jose Perez

    1994-01-01

    Let a discounted continuous review preventive-maintenance replacement model be such that its total discounted cost is given by means of two functional equations. We assume that downtime is caused by equipment breakdowns, and the length of a given downtime is the time necessary to repair the equipment and set it back in operation. The periodic preventive replacement policy is to replace the equipment by a new identical equipment when service age X is reached, or when the equipment ...

  7. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  8. The household decision making process in replacement of durable goods

    OpenAIRE

    Marell Molander, Agneta

    1998-01-01

    As durables are essential in many households, the level of ownership is high and, due to the high degree of penetration, a vast proportion of the current sales are replacement purchases. Even though a lot of research attention has been paid to decision making and decision processes many models are oriented towards non-durable goods and although a majority of purchases of many durable goods are replacements, few studies seem to make a distinction between a replacement purchase decision and a d...

  9. An approach to solve replacement problems under intuitionistic fuzzy nature

    Science.gov (United States)

    Balaganesan, M.; Ganesan, K.

    2018-04-01

    Due to impreciseness to solve the day to day problems the researchers use fuzzy sets in their discussions of the replacement problems. The aim of this paper is to solve the replacement theory problems with triangular intuitionistic fuzzy numbers. An effective methodology based on fuzziness index and location index is proposed to determine the optimal solution of the replacement problem. A numerical example is illustrated to validate the proposed method.

  10. Mitochondrial replacement techniques: egg donation, genealogy and eugenics.

    Science.gov (United States)

    Palacios-González, César

    2016-03-01

    Several objections against the morality of researching or employing mitochondrial replacement techniques have been advanced recently. In this paper, I examine three of these objections and show that they are found wanting. First I examine whether mitochondrial replacement techniques, research and clinical practice, should not be carried out because of possible harms to egg donors. Next I assess whether mitochondrial replacement techniques should be banned because they could affect the study of genealogical ancestry. Finally, I examine the claim that mitochondrial replacement techniques are not transferring mitochondrial DNA but nuclear DNA, and that this should be prohibited on ethical grounds.

  11. Effect of partial replacement of fishmeal with african yam bean ...

    African Journals Online (AJOL)

    Effect of partial replacement of fishmeal with african yam bean ( Sphenostylis stenocarpa ) meal on eggs, sperm quality and spawning performance of African Catfish Clarias gariepinus (Burchell, 1822) broodstock.

  12. Volume of Requests for Internet Medicare Replacement Cards

    Data.gov (United States)

    Social Security Administration — This dataset provides monthly volumes at the national level from federal fiscal year 2008 onwards for Internet Medicare Replacement Card. The dataset includes only...

  13. Replacing fallow by cover crops: economic sustainability

    Science.gov (United States)

    Gabriel, José Luis; Garrido, Alberto; Quemada, Miguel

    2013-04-01

    Replacing fallow by cover crops in intensive fertilized systems has been demonstrated as an efficient tool for reducing nitrate leaching. However, despite the evident environmental services provided and the range of agronomic benefits documented in the literature, farmers' adoption of this new technology is still limited because they are either unwilling or unable, although adoption reluctance is frequently rooted in low economic profitability, low water se efficiency or poor knowledge. Economic analyses permit a comparison between the profit that farmers obtain from agricultural products and the cost of adopting specific agricultural techniques. The goal of this study was to evaluate the economic impact of replacing the usual winter fallow with cover crops (barley (Hordeum vulgare L., cv. Vanessa), vetch (Vicia villosa L., cv. Vereda) and rapeseed (Brassica napus L., cv. Licapo)) in irrigated maize systems and variable Mediterranean weather conditions using stochastic Monte-Carlo simulations of key farms' financial performance indicators. The three scenarios studied for each cover crop were: i) just leaving the cover crop residue in the ground, ii) leaving the cover crop residue but reduce following maize fertilization according to the N available from the previous cover crop and iii) selling the cover crop residue for animal feeding. All the scenarios were compared with respect to a typical maize-fallow rotation. With observed data from six different years and in various field trials, looking for different weather conditions, probability distribution functions of maize yield, cover crop biomass production and N fertilizer saving was fitted. Based in statistical sources maize grain price, different forage prices and the cost of fertilizer were fitted to probability distribution functions too. As result, introducing a cover crop involved extra costs with respect to fallow as the initial investment, because new seed, herbicide or extra field operations. Additional

  14. Citrate Anticoagulation during Continuous Renal Replacement Therapy.

    Science.gov (United States)

    Ricci, Davide; Panicali, Laura; Facchini, Maria Grazia; Mancini, Elena

    2017-01-01

    During extracorporeal dialysis, some anticoagulation strategy is necessary to prevent the coagulation of blood. Heparin has historically been used as an anticoagulant because of its efficacy combined with low cost. However, a variable incidence of hemorrhagic complications (5-30%) has been documented in patients undergoing continuous renal replacement therapy (CRRT) with heparin as an anticoagulant. Citrate has anticoagulation properties secondary to its ability to chelate calcium, which is necessary for the coagulation cascade. Citrate may thus be used in a regional anticoagulation (RCA), limited to the extracorporeal circuit of CRRT, to avoid systemic anticoagulation. Recent meta-analysis confirmed the advantage of RCA over heparin in terms of incidence of bleeding during CRRT. Moreover, an increase in filter lifespan is documented, with a secondary advantage in reaching the prescribed dialysis dose. In our experience, we could confirm this positive effect. In fact, with a progressive increase in the proportion of CRRT with citrate as RCA, we obtained a reduction in the number of filters used for every 72 h of treatment (from 2.4 in 2011 to 1.3 in 2015), and most importantly, a reduction in the difference between the prescribed and delivered dialysis doses (from 22 to 7%). Citrate has an intense effect on the acid-base balance as well, if fully metabolized through the Krebs cycle, due to the production of bicarbonate. Even more severely ill patients, such as those with liver dysfunction, may be treated with RCA without severe complications, because modern machines for CRRT are equipped with simple systems that are able to manage the citrate infusion and control the calcium levels, with minimal risks of metabolic derangements. © 2017 S. Karger AG, Basel.

  15. Why Lumbar Artificial Disk Replacements (LADRs) Fail.

    Science.gov (United States)

    Pettine, Kenneth; Ryu, Robert; Techy, Fernando

    2017-07-01

    A retrospective review of prospectively collected data. To determine why artificial disk replacements (ADRs) fail by examining results of 91 patients in FDA studies performed at a single investigational device exemption (IDE) site with minimum 2-year follow-up. Patients following lumbar ADR generally achieve their 24-month follow-up results at 3 months postoperatively. Every patient undergoing ADR at 1 IDE site by 2 surgeons was evaluated for clinical success. Failure was defined as <50% improvement in ODI and VAS or any additional surgery at index or adjacent spine motion segment. Three ADRs were evaluated: Maverick, 25 patients; Charité, 31 patients; and Kineflex, 35 patients. All procedures were 1-level operations performed at L4-L5 or L5-S1. Demographics and inclusion/exclusion criteria were similar and will be discussed. Overall clinical failure occurred in 26% (24 of 91 patients) at 2-year follow-up. Clinical failure occurred in: 28% (Maverick) (7 of 25 patients), 39% (Charité) (12 of 31 patients), and 14% (Kineflex) (5 of 35 patients). Causes of failure included facet pathology, 50% of failure patients (12 of 24). Implant complications occurred in 5% of total patients and 21% of failure patients (5 of 24). Only 5 patients went from a success to failure after 3 months. Only 1 patient went from a failure to success after a facet rhizotomy 1 year after ADR. Seventy-four percent of patients after ADR met strict clinical success after 2-year follow-up. The clinical success versus failure rate did not change from their 3-month follow-up in 85 of the 91 patients (93%). Overall clinical success may be improved most by patient selection and implant type.

  16. Can postmortem fetal MR imaging replace autopsy?

    International Nuclear Information System (INIS)

    Cho, Jeong Yeon; Song, Mi Jin; Kim, Seoung Hyup

    2001-01-01

    The purposes of this study were to compare postmortem fetal MRI findings with autopsy findings and to assess whether postmortem MRI can replace autopsy. The study group consisted of 13 stillborn fetuses, seven that died immediately after birth, and five terminated because of anomalies seen on prenatal sonograms. A total 17 were male, and eight were female, and their gestational ages were from 20 to 41 (average;28.2) weeks. Spin-echo T1-and T2-weighted axial, sagittal, and coronal MR images were obtained, and autopsy findings were divided into major and minor. A major finding was defined as an anomaly or syndrome which caused fetal death or termination of the pregnancy: minor findings were classified, on the basis of gross inspection, as internal or external. MR images were retrospectively analyzed by two radiologists unaware of the autopsy findings, and by comparison with these, the postmortem MRI detection rates for major and minor findings was then determined. In seven of 25 fetuses, MR imaging revealed major findings, a dietction rate of 100%. There were two cases of anencephaly, two of trisomy-18, and one each of hydrops fetalis with large cystic hygroma, diaphragmatic hernia, and Dandy-Walker malformation. Twenty-three of 60 minor findings (38.3%) were detected by MRI. The detection rates for external and internal findings were 29.6%(8/27) and 45.5%(15/33), respectively. Although a limitation of our study is the low detection rate for minor findings, postmortem fetal MRI may help diagnose the major cause of fetal death

  17. Enzyme replacement therapy for murine hypophosphatasia.

    Science.gov (United States)

    Millán, José Luis; Narisawa, Sonoko; Lemire, Isabelle; Loisel, Thomas P; Boileau, Guy; Leonard, Pierre; Gramatikova, Svetlana; Terkeltaub, Robert; Camacho, Nancy Pleshko; McKee, Marc D; Crine, Philippe; Whyte, Michael P

    2008-06-01

    Hypophosphatasia (HPP) is the inborn error of metabolism that features rickets or osteomalacia caused by loss-of-function mutation(s) within the gene that encodes the tissue-nonspecific isozyme of alkaline phosphatase (TNALP). Consequently, natural substrates for this ectoenzyme accumulate extracellulary including inorganic pyrophosphate (PPi), an inhibitor of mineralization, and pyridoxal 5'-phosphate (PLP), a co-factor form of vitamin B6. Babies with the infantile form of HPP often die with severe rickets and sometimes hypercalcemia and vitamin B6-dependent seizures. There is no established medical treatment. Human TNALP was bioengineered with the C terminus extended by the Fc region of human IgG for one-step purification and a deca-aspartate sequence (D10) for targeting to mineralizing tissue (sALP-FcD10). TNALP-null mice (Akp2-/-), an excellent model for infantile HPP, were treated from birth using sALP-FcD10. Short-term and long-term efficacy studies consisted of once daily subcutaneous injections of 1, 2, or 8.2 mg/kg sALP-FcD10 for 15, 19, and 15 or 52 days, respectively. We assessed survival and growth rates, circulating levels of sALP-FcD10 activity, calcium, PPi, and pyridoxal, as well as skeletal and dental manifestations using radiography, microCT, and histomorphometry. Akp2-/- mice receiving high-dose sALP-FcD10 grew normally and appeared well without skeletal or dental disease or epilepsy. Plasma calcium, PPi, and pyridoxal concentrations remained in their normal ranges. We found no evidence of significant skeletal or dental disease. Enzyme replacement using a bone-targeted, recombinant form of human TNALP prevents infantile HPP in Akp2-/- mice.

  18. Enzyme Replacement Therapy for Murine Hypophosphatasia*

    Science.gov (United States)

    Millán, José Luis; Narisawa, Sonoko; Lemire, Isabelle; Loisel, Thomas P; Boileau, Guy; Leonard, Pierre; Gramatikova, Svetlana; Terkeltaub, Robert; Camacho, Nancy Pleshko; McKee, Marc D; Crine, Philippe; Whyte, Michael P

    2008-01-01

    Introduction Hypophosphatasia (HPP) is the inborn error of metabolism that features rickets or osteomalacia caused by loss-of-function mutation(s) within the gene that encodes the tissue-nonspecific isozyme of alkaline phosphatase (TNALP). Consequently, natural substrates for this ectoenzyme accumulate extracellulary including inorganic pyrophosphate (PPi), an inhibitor of mineralization, and pyridoxal 5`-phosphate (PLP), a co-factor form of vitamin B6. Babies with the infantile form of HPP often die with severe rickets and sometimes hypercalcemia and vitamin B6-dependent seizures. There is no established medical treatment. Materials and Methods Human TNALP was bioengineered with the C terminus extended by the Fc region of human IgG for one-step purification and a deca-aspartate sequence (D10) for targeting to mineralizing tissue (sALP-FcD10). TNALP-null mice (Akp2−/−), an excellent model for infantile HPP, were treated from birth using sALP-FcD10. Short-term and long-term efficacy studies consisted of once daily subcutaneous injections of 1, 2, or 8.2 mg/kg sALP-FcD10 for 15, 19, and 15 or 52 days, respectively. We assessed survival and growth rates, circulating levels of sALP-FcD10 activity, calcium, PPi, and pyridoxal, as well as skeletal and dental manifestations using radiography, μCT, and histomorphometry. Results Akp2−/− mice receiving high-dose sALP-FcD10 grew normally and appeared well without skeletal or dental disease or epilepsy. Plasma calcium, PPi, and pyridoxal concentrations remained in their normal ranges. We found no evidence of significant skeletal or dental disease. Conclusions Enzyme replacement using a bone-targeted, recombinant form of human TNALP prevents infantile HPP in Akp2−/− mice. PMID:18086009

  19. Transportation of nuclear weapons through urban areas in the United Kingdom

    International Nuclear Information System (INIS)

    1990-01-01

    This study concentrates on the road carriage of assembled nuclear warheads to and from the Royal Ordnance factory at Burghfield, Berkshire - a task that is necessary to deliver new warheads to the sites of storage and deployment, and which also entails movement of existing stocks of warheads being returned to Burghfield for maintenance, refurbishing and or replacement. During these movements there is risk of accident and damage to the warhead assemblies in transit and, therefore, consequences that could result in harm to people and property in the locality of the accident. (author)

  20. A comparison of minimally invasive and standard aortic valve replacement.

    Science.gov (United States)

    Stoliński, Jarosław; Plicner, Dariusz; Grudzień, Grzegorz; Wąsowicz, Marcin; Musiał, Robert; Andres, Janusz; Kapelak, Bogusław

    2016-10-01

    The study objective was to compare aortic valve replacement through a right anterior minithoracotomy with aortic valve replacement through a median sternotomy. With propensity score matching, we selected 211 patients after aortic valve replacement through a right anterior minithoracotomy and 211 patients after aortic valve replacement who underwent operation between January 2010 and December 2013. Perioperative outcomes were analyzed, and multivariable logistic regression analysis of risk factors of postoperative morbidity was performed. For propensity score-matched patients, hospital mortality was 1.0% in the aortic valve replacement through a right anterior minithoracotomy group and 1.4% in the aortic valve replacement group (P = 1.000). Stroke occurred in 0.5% versus 1.4% (P = .615), myocardial infarction occurred in 1.4% versus 1.9% (P = 1.000), and new onset of atrial fibrillation occurred in 12.8% versus 24.2% (P = .003) of patients in the aortic valve replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Postoperative drainage was 353.5 ± 248.6 mL versus 544.3 ± 324.5 mL (P replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Mediastinitis occurred in 2.8% of patients after aortic valve replacement and in 0.0% of patients after aortic valve replacement through a right anterior minithoracotomy surgery (P = .040). Intensive care unit stay (1.3 ± 1.2 days vs 2.6 ± 2.6 days) and hospital stay (5.7 ± 1.6 days vs 8.7 ± 4.4 days) were statistically significantly shorter in the aortic valve replacement through a right anterior minithoracotomy group. Aortic valve replacement through a right anterior minithoracotomy surgery resulted in reduced postoperative morbidity (odds ratio, 0.4; P replacement through a right anterior minithoracotomy surgery resulted in a reduced infection rate, diminished postoperative bleeding and blood

  1. Effect of growth hormone replacement therapy on pituitary hormone secretion and hormone replacement therapies in GHD adults

    DEFF Research Database (Denmark)

    Hubina, Erika; Mersebach, Henriette; Rasmussen, Ase Krogh

    2004-01-01

    We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes.......We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes....

  2. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    Iizuka, N.

    2000-01-01

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  3. 30 CFR 57.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 57.12036 Section 57.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12036 Fuse removal or replacement. Fuses shall not be removed or...

  4. 49 CFR 224.109 - Inspection, repair, and replacement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Inspection, repair, and replacement. 224.109 Section 224.109 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD..., Inspection, and Maintenance of Retroreflective Material § 224.109 Inspection, repair, and replacement. (a...

  5. 30 CFR 57.4203 - Extinguisher recharging or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Extinguisher recharging or replacement. 57.4203 Section 57.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Prevention and Control Firefighting Equipment § 57.4203 Extinguisher recharging or replacement. Fire...

  6. 33 CFR 1.26-5 - Replacement of medals.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Replacement of medals. 1.26-5 Section 1.26-5 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL... Rentals § 1.26-5 Replacement of medals. (a) A medal, or a bar, emblem, or insignia in lieu thereof, that...

  7. Replacement Value of Palm Kernel Meal for Maize on Carcass ...

    African Journals Online (AJOL)

    This study was conducted to evaluate the effect of replacing maize with palm kernel meal on nutrient composition, fatty acid profile and sensory qualities of the meat of turkeys fed the dietary treatments. Six dietary treatments were formulated using palm kernel meal to replace maize at 0, 20, 40, 60, 80 and 100 percent.

  8. On Foundation Improvement By Sand Replacement | Abam | Global ...

    African Journals Online (AJOL)

    This paper describes a simple foundation improvement method involving the replacement of poor foundation bearing soils with sand and the resultant improvement in bearing capacity and the minimization of settlement at the site of a large storage tank. Minimum thickness of sand replacement for various foundation loads ...

  9. Esophageal Replacement for Long-Gap Esophageal Atresia in a ...

    African Journals Online (AJOL)

    humility to know when to consider a replacement procedure (3). To replace the esophagus of a baby is a major decision in many pediatric surgical units world over. Fortunately, the need for this procedure has decreased in the recent years due to the increase in the variety of techniques of lengthening the upper esophageal ...

  10. Continuous renal replacement therapy for critically ill infants and children

    DEFF Research Database (Denmark)

    Pedersen, Ole; Jepsen, Søren Bruun; Toft, Palle

    2012-01-01

    Continuous renal replacement therapy (CRRT) is an important treatment in critically ill children with acute kidney injury (AKI). Over the past decade, CRRT has been the preferred method of renal replacement therapy. We compared children with CRRT-treated adults with AKI in terms of return of kidney...

  11. 30 CFR 56.4203 - Extinguisher recharging or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Extinguisher recharging or replacement. 56.4203 Section 56.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Prevention and Control Firefighting Equipment § 56.4203 Extinguisher recharging or replacement. Fire...

  12. The replacement value of groundnut cake with cooked Bambara ...

    African Journals Online (AJOL)

    Seventy five day-old Anak 2000 broiler chicks were randomly allotted to five dietary treatments 1, 2, 3, 4 and 5 in which groundnut cake (GNC) was replaced by cooked bambara groundnut meal (CBGM) at 0, 25, 50, 75 and 100% levels of inclusion for both starter and finisher phases. Replacement levels of cooked bambara ...

  13. Hormone replacement therapy increases the risk of cranial meningioma

    DEFF Research Database (Denmark)

    Andersen, Lene; Friis, Søren; Hallas, Jesper

    2013-01-01

    We investigated the influence of hormone replacement therapy (HRT) use on the risk of meningioma in a population-based setting.......We investigated the influence of hormone replacement therapy (HRT) use on the risk of meningioma in a population-based setting....

  14. 41 CFR 51-6.14 - Replacement services.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Replacement services. 51-6.14 Section 51-6.14 Public Contracts and Property Management Other Provisions Relating to Public... § 51-6.14 Replacement services. If a service is on the Procurement List to meet the needs of a...

  15. 9 CFR 82.15 - Replacement birds and poultry.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Replacement birds and poultry. 82.15... AGRICULTURE INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS EXOTIC NEWCASTLE DIS- EASE (END) AND CHLAMYDIOSIS Exotic Newcastle Disease (END) § 82.15 Replacement birds and poultry. Birds...

  16. Application of capital replacement models with finite planning horizons

    NARCIS (Netherlands)

    Scarf, P.A.; Christer, A.H.

    1997-01-01

    Capital replacement models with finite planning horizons can be used to model replacement policies in complex operational contexts. They may also be used to investigate the cost consequences of technological change. This paper reviews the application of these models in various such contexts. We also

  17. Opportunity-based age replacement: exponentially distributed times between opportunities

    NARCIS (Netherlands)

    R. Dekker (Rommert); M.C. Dijkstra (Matthijs)

    1992-01-01

    textabstractThis article gives a full analysis of a component-replacement model in which preventive replacements are only possible at maintenance opportunities. These oppertunities arise according to a Poisson process, independently of failures of the component. Conditions for the existence of a

  18. Functionality of Inulin as a Sucrose Replacer in Cookie Baking

    Science.gov (United States)

    Inulin was evaluated as a sucrose replacer for healthy cookie production with benefits of low glycemic impact and prebiotic soluble fiber. Sucrose (as a reference) and three inulin products of different concentrations (as soluble fibers) were used to explore the effects of sugar-replacer type on so...

  19. Performance of concrete with partial replacement of fine aggregates ...

    African Journals Online (AJOL)

    The study investigated the level of replacement of fine aggregate with waste glass that will result in optimal compressive strength. A total of 36 cubes were cast. 6 cubes without waste glass (control) and 30 cubes containing waste glass as partial replacement for fine aggregates at 15%, 25%, 35%, 45%, and 50%.

  20. Quantitative replacement of soybean meal with toasted African yam ...

    African Journals Online (AJOL)

    From the result, one can conclude that 25% AYB (treatment II) compared favourably with the control diets 0% AYB in starter broiler diets and is hereby recommended as optimal for quantitative replacement of soybean in broiler starter diet. Key words: Broiler Starter diet, African Yam Bean, Soyabean replacement ...

  1. Improving compliance with hormonal replacement therapy in primary osteoporosis prevention

    DEFF Research Database (Denmark)

    Vestergaard, P; Hermann, A P; Gram, J

    1997-01-01

    To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule.......To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule....

  2. Remaining lifetime modelling for replacement of power transformer populations

    NARCIS (Netherlands)

    Schijndel, van A.; Wetzer, J.; Wouters, P.A.A.F.

    2008-01-01

    The age of the majority of power transformers applied in the western electricity network varies between 25 and 50 years. Depending on the load history and time of operation, replacement on short term is imminent. A technically sound policy concerning the replacement of these assets must be based on

  3. Studies on the replacement policies in dairy cattle

    NARCIS (Netherlands)

    Arendonk, van J.A.M.

    1985-01-01

    In The Netherlands dairy farmers replace on average 25-30% of their cows each year. The decision to replace instead of to keep a cow is based mainly on economic considerations rather than because a cow is no longer able to produce.

    The investigations described in this thesis were

  4. Opportunity-based block replacement: the single component case

    NARCIS (Netherlands)

    R. Dekker (Rommert); E. Smeitink

    1991-01-01

    textabstractIn this paper we consider a block replacement model in which a component can be replaced preventively at maintenance opportunities only. Maintenance opportunities occur randomly and are modelled through a renewal process. In the first, theoretical part of the paper we derive an

  5. Gait analysis after successful mobile bearing total ankle replacement.

    NARCIS (Netherlands)

    Doets, H.C.; van Middelkoop, M.; Houdijk, J.H.P.; Nelissen, R.G.; Veeger, H.E.J.

    2007-01-01

    Background: The effect of total ankle replacement on gait is not fully known in terms of joint kinematics, ground reaction force, and activity of the muscles of the lower leg. Methods: A comparative gait study was done in 10 patients after uneventful unilateral mobile-bearing total ankle replacement

  6. The metabolic consequences of thyroxine replacement in adult hypopituitary patients

    DEFF Research Database (Denmark)

    Filipsson Nyström, Helena; Feldt-Rasmussen, Ulla; Kourides, Ione

    2012-01-01

    The metabolic consequences of thyroxine replacement in patients with central hypothyroidism (CH) need to be evaluated. The aim was to examine the outcome of thyroxine replacement in CH. Adult hypopituitary patients (n = 1595) with and without CH from KIMS (Pfizer International Metabolic Database...

  7. A.R.T. – Aggression Replacement Training

    DEFF Research Database (Denmark)

    Harbo, Lotte Junker; Domben, Eskil

    2015-01-01

    Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training.......Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training....

  8. Advances in the replacement and enhanced replacement method in QSAR and QSPR theories.

    Science.gov (United States)

    Mercader, Andrew G; Duchowicz, Pablo R; Fernández, Francisco M; Castro, Eduardo A

    2011-07-25

    The selection of an optimal set of molecular descriptors from a much greater pool of such regression variables is a crucial step in the development of QSAR and QSPR models. The aim of this work is to further improve this important selection process. For this reason three different alternatives for the initial steps of our recently developed enhanced replacement method (ERM) and replacement method (RM) are proposed. These approaches had previously proven to yield near optimal results with a much smaller number of linear regressions than the full search. The algorithms were tested on four different experimental data sets, formed by collections of 116, 200, 78, and 100 experimental records from different compounds and 1268, 1338, 1187, and 1306 molecular descriptors, respectively. The comparisons showed that one of the new alternatives further improves the ERM, which has shown to be superior to genetic algorithms for the selection of an optimal set of molecular descriptors from a much greater pool. The new proposed alternative also improves the simpler and the lower computational demand algorithm RM.

  9. REPLACEMENT CONTROL OF INNOVATION MANAGERS: ORGANIZATIONAL AND ECONOMIC ASPECTS

    Directory of Open Access Journals (Sweden)

    E. V. Gurina

    2011-01-01

    Full Text Available The paper substantiates phases of specialists’ replacement ensuring innovation development of the national economy in Belarus, i.e. managers of innovation activity. Realization of replacement phases is presented within the system consisting of four blocks – objective, managing, controllable and providing. Analysis results of the current state of the innovation activity managers replacement system reveal main problems in interaction of its basic agents. The paper considers solution of specified problems in the context of formation of organizational and economic approaches to managing the innovation activity managers replacement system which presupposes modernization of organizational interrelations between state- run public authorities in the managing block and micro-incentive structures in the controllable block as well as the usage of the process approach in every phase of the replacement process. 

  10. Decommissioning and equipment replacement of nuclear power plants under uncertainty

    International Nuclear Information System (INIS)

    Takashima, Ryuta; Naito, Yuta; Kimura, Hiroshi; Madarame, Haruki

    2007-01-01

    This study examines the optimal timing for the decommissioning and equipment replacement of nuclear power plants. We consider that the firm has two options of decommissioning and equipment replacement, and determines to exercise these options under electricity price uncertainty. This problem is formulated as two optimal stopping problems. The solution of this model provides the value of the nuclear power plant and the threshold values for decommissioning and replacement. The dependence of decommissioning and replacement strategies on uncertainty and each cost is shown. In order to investigate the probability of events for decommissioning and replacement, Monte Carlo calculations are performed. We also show the probability distribution and the conditional expected time for each event. (author)

  11. Technical development and its application on steam generator replacement

    International Nuclear Information System (INIS)

    Morita, Sadahiko; Hanzawa, Katsumi; Sato, Hajime; Kannoto, Yasuo.

    1995-01-01

    Twenty-two PWR nuclear power plants are now under commercial operation in Japan. Eight of these plants are scheduled to have their steam generators replaced by up-graded units as a social responsibility for improved reliability, economy and easier maintenance. To carry out steam generator replacement, main coolant pipe cutting and restoration techniques, remote controlled welding machines and other remote controlled equipment, templating techniques with which the new steam generator primary nozzles will fit the existing primary pipes correctly were developed. An adequate training program was carried out to establish these techniques and they were then applied in replacement work on site. The steam generators of the three plants were replaced completely in 1994. These newly developed techniques are to be applied in upcoming plants and replaced plants will be much reliable. (author)

  12. Can Geothermal Power Replace Fossil Fuels?

    Science.gov (United States)

    Klenner, R.; Gosnold, W. D.

    2009-12-01

    is scaled up to produce power in the MW range. Values needed for these systems are temperatures of 92+ °C and flow rates of 140-1000 gpm. In a detailed analysis of the North Dakota part of the Williston Basin, we used heat flow, bottom-hole temperatures, and measured temperature gradients to calculate the energy contained within specific formations having temperatures in the range of 100 °C to 150 °C. We find that at a 2% recovery factor, approximately 4500 MW/hr can be recovered at depths of 3-4 km. North Dakota currently produces approximately 3100 MW/hr from non-renewable sources such as coal and petroleum. We conclude that the geothermal resource in the Williston Basin could completely replace fossil fuels as an electrical power supply for North Dakota.

  13. Nursing procedures during continuous renal replacement therapies: a national survey.

    Science.gov (United States)

    Ricci, Zaccaria; Benelli, Sonia; Barbarigo, Fabio; Cocozza, Giulia; Pettinelli, Noemi; Di Luca, Emanuela; Mettifogo, Mariangela; Toniolo, Andrea; Ronco, Claudio

    2015-01-01

    The current role of nurses in the management of critically ill patients needing continuous renal replacement therapies is clearly fundamental. The care of these complex patients is typically shared by critical care and dialysis nurses: their precise duties may vary from country to country. To clarify this issue we conducted a national-level survey at a recent Italian course on nursing practices during continuous renal replacement therapies. A total of 119 questionnaires were analysed. The participants, who were equally divided between critical care and dialysis nurses, came from 44 different hospitals and 35 Italian cities. Overall, 23% of participants answered that "the dialysis staff" were responsible for continuous renal replacement therapies in the Intensive Care Unit, while 39% answered "the critical care nurse", and 38% "a shared organization". Interestingly, less than the half of participants claimed specific continuous renal replacement therapies training was provided to employees before handling an acute dialysis machine. Finally, about 60% of participants had experience of extra-corporeal membrane oxygenation machines used in conjunction with continuous renal replacement therapies. Workload coordination and management of critically ill patients undergoing continuous renal replacement therapies in Italy is not standardized. At present, the duties of critical care and dialysis nurses vary significantly across the country. They frequently overlap or leave gaps in the assistance received by patients. The role of nurses involved in the care of continuous renal replacement therapies patients in Italy currently requires better organization, possibly starting with intensive standardized training and educational programs.

  14. Changing of the guard: reducing infection when replacing neural pacemakers.

    Science.gov (United States)

    Pepper, Joshua; Meliak, Lara; Akram, Harith; Hyam, Jonathan; Milabo, Catherine; Candelario, Joseph; Foltynie, Thomas; Limousin, Patricia; Curtis, Carmel; Hariz, Marwan; Zrinzo, Ludvic

    2017-04-01

    OBJECTIVE Infection of deep brain stimulation (DBS) hardware has a significant impact on patient morbidity. Previous experience suggests that infection rates appear to be higher after implantable pulse generator (IPG) replacement surgery than after the de novo DBS procedure. In this study the authors examine the effect of a change in practice during DBS IPG replacements at their institution. METHODS Starting in January 2012, patient screening for methicillin-resistant Staphylococcus aureus (MRSA) and, and where necessary, eradication was performed prior to elective DBS IPG change. Moreover, topical vancomycin was placed in the IPG pocket during surgery. The authors then prospectively examined the infection rate in patients undergoing DBS IPG replacement at their center over a 3-year period with at least 9 months of follow-up. RESULTS The total incidence of infection in this prospective consecutive series of 101 IPG replacement procedures was 0%, with a mean follow-up duration of 24 ± 11 months. This was significantly lower than the authors' previously published historical control group, prior to implementing the change in practice, where the infection rate for IPG replacement was 8.5% (8/94 procedures; p = 0.003). CONCLUSIONS This study suggests that a change in clinical practice can significantly lower infection rates in patients undergoing DBS IPG replacement. These simple measures can minimize unnecessary surgery, loss of benefit from chronic stimulation, and costly hardware replacement, further improving the cost efficacy of DBS therapies.

  15. Steam generator replacement: a story of continuous improvement

    International Nuclear Information System (INIS)

    Sills, M.S.; Wilkerson, R.

    2009-01-01

    This paper provides a review of the history of steam generator replacement in the US focusing on the last five years. From the early replacements in the 1980s, there have been major technology improvements resulting in dramatically shorter outages and reduced radiological exposure for workers. Even though the changes for the last five years have been less dramatic, the improvement trend continues. No two steam generator replacement (SGR) projects are the same and there are some major differences including; the access path for the components to containment (is a construction opening in containment required), type of containment, number of steam generators, one piece or two piece replacement, plant type (Westinghouse, CE or B and W) and plant layout. These differences along with other variables such as delays due to plant operations and other activities not related to the steam generator replacement make analysis of performance data difficult. However, trends in outage performance and owner expectations can be identified. How far this trend will go is also discussed. Along with the trend of improved performance, there is also a significant variation in performance. Some of the contributors to this variation are identified. This paper addresses what is required for a successful outage, meeting the increasing expectations and setting new records. The authors will discuss various factors that contribute to the success of a steam generator replacement. These factors include technical issues and, equally important, organizational interface and the role the customer plays. Recommendations are provided for planning a successful steam generator replacement outage. (author)

  16. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  17. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  18. Nonparametric adaptive age replacement with a one-cycle criterion

    International Nuclear Information System (INIS)

    Coolen-Schrijner, P.; Coolen, F.P.A.

    2007-01-01

    Age replacement of technical units has received much attention in the reliability literature over the last four decades. Mostly, the failure time distribution for the units is assumed to be known, and minimal costs per unit of time is used as optimality criterion, where renewal reward theory simplifies the mathematics involved but requires the assumption that the same process and replacement strategy continues over a very large ('infinite') period of time. Recently, there has been increasing attention to adaptive strategies for age replacement, taking into account the information from the process. Although renewal reward theory can still be used to provide an intuitively and mathematically attractive optimality criterion, it is more logical to use minimal costs per unit of time over a single cycle as optimality criterion for adaptive age replacement. In this paper, we first show that in the classical age replacement setting, with known failure time distribution with increasing hazard rate, the one-cycle criterion leads to earlier replacement than the renewal reward criterion. Thereafter, we present adaptive age replacement with a one-cycle criterion within the nonparametric predictive inferential framework. We study the performance of this approach via simulations, which are also used for comparisons with the use of the renewal reward criterion within the same statistical framework

  19. Report on the meeting for examining replacing core

    International Nuclear Information System (INIS)

    1977-01-01

    At the time of examining the application for approval of reactor installation, it must be confirmed that the safety of the concerned reactor is secured with not only the initially loaded core but also the replacing core. Besides, it must be confirmed again that the various criteria concerning the safety are satisfied after the start of operation, because a part of the parameters of the replacing core is dependent on the operational history. On the above described viewpoints, the main parameters affecting the safety and the nuclear and thermal limits of replacing core were reviewed. Moreover, the contents of description concerning replacing core in the application form were examined. As the general matters concerning the safety of replacing core, the scram reactivity curves for BWRs and PWRs, the method of description in the application form concerning the fuel containing gadolinia, and the use of burnable poison in replacing core were examined. The meeting for examining replacing core was organized on September 20, 1976, at the Committee for Examining Reactor Safety, and this report was compiled as the results of 10 meetings. (Kako, I.)

  20. Aluminum Micro-Balloons as Improved Fuel for Warhead Explosives

    Science.gov (United States)

    2018-01-29

    12-1-0006 Dr. Jerry W. Forbes Prepared by: Energetics Technology Center 10400 O Donnell Place Suite 202 St. Charles , MD 20603...compression viewpoint. Such analysis will allow future experiments to be designed to obtain data that define air blast energy release models. This...made to react fast under shock compression, large power will be produced in reactive shock waves transmitted through the mixture. The three issues

  1. Two-Black Box Concept for Warhead Verification

    Energy Technology Data Exchange (ETDEWEB)

    Bates, Cameron Russell [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Frame, Katherine Chiyoko [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mckigney, Edward Allen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Smith, Morag Kristin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-06

    We have created a possible solution to meeting the requirements of certification/authentication while still employing complicated criteria. Technical solutions to protecting information from the host in an inspection environment needs to be assessed by those with specific expertise but, LANL can still study the verification problem. The two-black box framework developed provides another potential solution to the confidence vs. certification paradox.

  2. HIBAL Program. Preliminary Warhead-Design. Volume II. Appendices.

    Science.gov (United States)

    1980-09-15

    Mild Steel (iAi i018). ............. 11-2 B. SAE 4130 .. .. .. .... ...... ....... 11-3 C. SAE 4140 ......... .... .... ......... 11-3 D, SAE 4340...11-7 - Test Data for SAE 4140 Steel Frag- ments ...... ................ 11-14 Figure II-7A - 4142 ... .............. 11-15 Figure 11-8 - Test Data...included the following types of steel: SAE 1018, 4130, 4140 and 4340; 5-317 and 5-876 Carpenter tool steel; Anico HY-80 and SSS-100 steel; AISI-S7

  3. Reoperative aortic root replacement: Outcome in a contemporary series.

    Science.gov (United States)

    Esaki, Jiro; Leshnower, Bradley G; Binongo, Jose N; Lasanajak, Yi; McPherson, LaRonica; Thourani, Vinod H; Chen, Edward P

    2017-09-01

    Reoperative aortic root replacement is a challenging procedure associated with significant mortality and morbidity. The purpose of this study was to investigate the outcomes of reoperative aortic root replacement when performed in a number of complex clinical settings and to identify risk factors for operative mortality and long-term survival. From 2006 to 2015, 280 consecutive patients at an academic center underwent reoperative aortic root replacement after a variety of previous aortic or cardiac operations. Logistic regression and extended Cox proportional hazards regression analyses were used to determine risk factors for operative mortality and long-term survival, respectively. The mean age of patients was 52.5 ± 14.1 years. Prior operations included proximal aortic replacement in 113 patients, valve surgery in 162 patients, and coronary artery bypass grafting in 46 patients. Concomitant procedures included arch replacement in 135 patients, coronary artery bypass grafting in 68 patients, and mitral valve repair/replacement in 18 patients. Operative mortality was 14.3%. Five-year survival was 74.0%. Univariable analysis did not find previous root replacement, prior proximal aortic surgery, and concomitant arch replacement to be risk factors for operative mortality. In the multivariable analysis, chronic lung disease, prior myocardial infarction, and concomitant mitral valve surgery were risk factors for operative mortality. Age, peripheral artery disease, emergency, and concomitant mitral valve surgery were risk factors for mortality in the late phase. Reoperative aortic root replacement represents complex procedures carrying significant morbidity and mortality. Chronic lung disease, prior myocardial infarction, and concomitant mitral valve surgery were risk factors for operative mortality. Age, peripheral artery disease, emergency, and concomitant mitral valve surgery were risk factors for long-term mortality. Copyright © 2017 The American Association for

  4. Strategies for replacement of obsolete equipment - including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2000-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of: commercially available equivalent component; modification of a commercial available component; reverse engineering of the original component; and finally, design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: Missing, misleading or no information on the original component; Acquiring information from the original equipment manufacturer and the plant; Using a sample component for the replacement evaluation and or reverse engineering; and Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  5. Strategies for replacement of obsolete equipment, including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of, (1) commercially available equivalent component, (2) modification of a commercial available component, (3) reverse engineering of the original component and finally (4) design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: 1) Missing, misleading or no information on the original component. 2) Acquiring information from the original equipment manufacturer and the plant. 3) Using a sample component for the replacement evaluation and or reverse engineering. 4) Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  6. Prospective study of ascending venogram following total hip replacement or total knee replacement

    Energy Technology Data Exchange (ETDEWEB)

    Youm, Chang Seon; Suh, Jin Seok; Lee, Jong Doo; Park, Chang Yun; Kim, Young Hoo [College of Medicine, Yonsei University, Seoul (Korea, Republic of)

    1987-04-15

    The ascending leg venogram was performed in one hundred forty six lower extremities on the 7th day following total hip replacement (THR) or total knee replacement (TKR). The results were as follows; 1.Overall incidence of deep vein thrombosis (DVT) in 146 limbs who underwent THR or TKR was 10%: DVT was detected in 8 limbs among 110 limbs following THR (7%) and 6 limbs among 36 limbs following TKR (17%). 2.The anatomic distribution of DVT was as follows: In THR, 12.5% in FV, 25% in FV and PV, 25% in FV and PV and CV, 12.5% in FV and CV, and 25% in CV. In TKR, 100% in CV. 3.There were many anatomic variations in deep veins of lower extremities: Accessory SFV (41 limbs), double PV(24), accessory SFV and double PV(7), duplication of SFV and PV(3), accessory SFV and multiple PV(2), and accessory SFV and double PV(1). 4.There were multiple SFV in 37%, and 19% of these limbs had DVT. It represented statistically higher than 4% in limbs with a single SFV (P-value < 0.05). 5.The incidence of DVT was 8% in cases of multiple PV, and there was no statistically significant difference between these groups and single PV groups. 6.We could assess number of values from popliteal vein to common femoral vein in 72 limbs. Mean number of value was 5.45 and there was no statistically significant difference between groups having valve over 5 and under 5.

  7. Politicization and the Replacement of Top Civil Servants in Denmark

    DEFF Research Database (Denmark)

    Christensen, Jørgen Grønnegård; Opstrup, Niels; Klemmensen, Robert

    2014-01-01

    This article of top civil servants in Danish central and local government sheds new light on politicization. A survival analysis shows that since 1970, the risk that a top civil servant will be replaced has increased. There is no evidence of politicization in central government while city managers......’ risk of replacement increases both when a new mayor, representing another party and holding an absolute majority, and when the shift of mayor takes place within the same party. We interpret these results as evidence of the adaptability of the merit civil service and political executives’ stronger...... insistence on their authority to make discretionary replacements....

  8. Software-based annunciator replacement: a tale of two projects

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, G.T., E-mail: simmongt@westinghouse.com [Westinghouse Electric Company LLC, Cranberry Township, PA (United States)

    2015-07-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  9. Vascular complications associated with transcatheter aortic valve replacement.

    Science.gov (United States)

    Sardar, M Rizwan; Goldsweig, Andrew M; Abbott, J Dawn; Sharaf, Barry L; Gordon, Paul C; Ehsan, Afshin; Aronow, Herbert D

    2017-06-01

    Transcatheter aortic valve replacement (TAVR) is now an accepted pathway for aortic valve replacement for patients who are at prohibitive, severe and intermediate risk for traditional aortic valve surgery. However, with this rising uptrend and adaptation of this new technology, vascular complications and their management remain an Achilles heel for percutaneous aortic valve replacement. The vascular complications are an independent predictor of mortality for patients undergoing TAVR. Early recognition of these complications and appropriate management is paramount. In this article, we review the most commonly encountered vascular complications associated with currently approved TAVR devices and their optimal percutaneous management techniques.

  10. Steam generator replacement at Doel 3 NPP (Belgium)

    International Nuclear Information System (INIS)

    Danhier, B.

    1993-01-01

    The reasons are presented that led to the conclusion that the most cost-effective strategy for the Doel 3 unit was the immediate replacement of the SG. Discussed are the advantages and drawbacks of the replacement techniques, the so-called 2, 3 and 4 cuts methods. The advantages are emphasized of intensive use of computer aided engineering in this kind of backfitting. The methodology applied to combine a power uprating of 10% over the nominal power with the steam generator replacement is presented. (author) 1 fig

  11. Software-based annunciator replacement: a tale of two projects

    International Nuclear Information System (INIS)

    Simmons, G.T.

    2015-01-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  12. Utilization of Teeth Replacement Service Among the Elderly ...

    African Journals Online (AJOL)

    . However, its utilization by the elderly has not been extensively studied. Aim: To determine the utilization of tooth replacement services among the elderly. Materials and Methods: This was a retrospective study of 440 patients aged 60 years ...

  13. Multi-stage type replacing method of iodine filter

    International Nuclear Information System (INIS)

    Kitamura, Masao; Kamiya, Kunio.

    1976-01-01

    Object: To effectively replace a filter into a removing device of radioactive impurities used in ventilation and air conditioning system or the like in an atomic power plant. Structure: A plurality of elements of a filter are arranged in series relative to fluid. In the first replacement, an ante-filter-element on inlet side of fluid is removed, and a post-filter-element is repositioned to that position of the ante-element. Then, a fresh element is newly mounted on that position of the post-element. Replacement after the second time may be effected by repeating the operation noted above. With this arrangement, the minimal value of collection efficiency at replacement of filter may be increased. (Ikeda, J.)

  14. Installation technology of reactor internals on shroud replacement work

    International Nuclear Information System (INIS)

    Miyano, Hiroshi

    1999-01-01

    Since the replacement of large welded reactor internals much as a core shroud did not have a precedent in the world, quite a few technologies had to be developed. Especially for the installation of new core shroud, jet pumps, core plate and top guide, the accurate weld and fit-up techniques for large structures was required to secure their integrity. The vessel shielding system was utilized to reduce general area dose rate such that all replacement work. For jet pump installation, automatic remote welding machines were used for high radiation area. As for the core shroud, shroud support weld prep machining tool with high accuracy, jacking system to support fit-up, new weld machine for small work space and low heat input weld joint were developed. Shroud replacement work in Fukushima Dai-ichi NPS Unit 3 (1F-3) with application of these development techniques, was successfully accomplished. The technology is applied for 1F-2 replacement work also. (author)

  15. Selection Process for Replacement Windows | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  16. Design Guidance for Replacement Windows | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  17. Replacement Windows for Existing Homes Homes | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  18. IOL Implants: Lens Replacement and Cataract Surgery (Intraocular Lenses)

    Science.gov (United States)

    ... Oncology Oculoplastics/Orbit Refractive Management/Intervention Retina/Vitreous Uveitis Focus On Pediatric Ophthalmology ... Are Cataracts? Pediatric Cataracts Cataract Diagnosis and Treatment Cataract Surgery IOL Implants: Lens Replacement After Cataracts ...

  19. A replacement solvent for dimethylsulfoxide /DMSO/ in CW dye lasers

    Energy Technology Data Exchange (ETDEWEB)

    Herbelin, J.M.; McKay, J.A.

    1981-01-01

    The use of propylene glycol carbonate as a replacement solvent for dimethyl sulfoxide in a Coherent model 599-21 CW dye laser has been investigated. Up to 40 milliwatts of single frequency output was achieved at 875 nm.

  20. Replacement and inspection policies for products with random life cycle

    International Nuclear Information System (INIS)

    Yun, Won Young; Nakagawa, Toshio

    2010-01-01

    In this paper, we consider maintenance policies for products in which the economical life cycle of products is a random variable. First, we study a periodic replacement policy with minimal repair. The system is minimally repaired at failure and is replaced by new one at age T (periodic replacement policy with minimal repair of Barlow and Hunter). The expected present value of total maintenance cost of products with random life cycle is obtained and the optimal replacement interval minimizing the cost is found. Second, we consider an inspection policy for products with random life cycle to detect the system failure. The expected total cost is obtained and the optimal inspection interval is found. Numerical examples are also included.

  1. Human Health Safety Evaluation of Halon Replacement Candidates

    National Research Council Canada - National Science Library

    Dodd, D. E; Jepson, G. W; Macko, Jr, J. A

    2000-01-01

    .... The services within the Department of Defense (DoD) are directed to determine and evaluate suitable halon replacement candidates that will optimize performance of mission-essential equipment and operations...

  2. Optimization on replacement and inspection period of plant equipment

    International Nuclear Information System (INIS)

    Takase, Kentaro; Kasai, Masao

    2004-01-01

    Rationalization of the plant maintenance is one of the main topics being investigated in Japanese nuclear power industries. Optimization of the inspection and replacement period of equipments is effective for the maintenance cost reduction. The more realistic model of the replacement policy is proposed in this study. It is based on the classical replacement policy model and its cost is estimated. Then, to consider the inspection for the maintenance, the formulation that includes the risk concept is discussed. Based on it, two variations of the combination of the inspection and the replacement are discussed and the costs are estimated. In this study the effect of the degradation of the equipment is important. The optimized maintenance policy depends on the existence of significant degradation. (author)

  3. Development of an approach to facilitate optimal equipment replacement.

    Science.gov (United States)

    1999-10-01

    The principle objective of this study was to develop a procedure using available departmental data on operation, maintenance and replacement costs to provide the Louisiana Department of Transportation and Development with guidelines for the identific...

  4. Green and economic fleet replacement modeling : part I.

    Science.gov (United States)

    2011-10-01

    "The purpose of this study was to gain a better understanding of how equipment replacement decisions are supported with data collection and : quantitative models at state DOTs, and to determine if models found in the research literature offer any bet...

  5. Laboratory Evaluation of LED T8 Replacement Lamp Products

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

    2011-05-23

    A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

  6. Analgesia after total hip replacement: epidural versus psoas ...

    African Journals Online (AJOL)

    tive analgesia following total hip replacement surgery. The research design was a ... matoma, intra-abdominal injury and pain due to spasm of the lumbar paravertebral ..... 2. Brown DL. Spinal, epidural, and caudal anesthesia In: Miller RD, ed.

  7. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  8. Hormone replacement for osteoporosis in women with primary biliary cirrhosis

    DEFF Research Database (Denmark)

    Rudic, Jelena S; Poropat, Goran; Krstic, Miodrag N

    2011-01-01

    Women with primary biliary cirrhosis often suffer from postmenopausal osteoporosis due to their age, or osteoporosis secondary to their liver disease, or treatments provided for their liver disease. Hormone replacement increases bone mineral density and reduces fractures in postmenopausal women...

  9. Effect of dietary citric acid supplementation and partial replacement ...

    African Journals Online (AJOL)

    Jane

    2011-10-24

    Oct 24, 2011 ... evaluate the effect of soybean meal (SBM) as a fishmeal (FM) partial replacement and citric acid (CA) .... temperature, pH and salinity were monitored daily and dissolved .... Digestibility, metabolism and excretion of dietary.

  10. Fiber-reinforced Composite for Chairside Replacement of Anterior ...

    African Journals Online (AJOL)

    Fiber-reinforced Composite for Chairside Replacement of Anterior Teeth: A Case Report. ... investigation will be required to provide additional information on the survival of directly-bonded anterior fixed prosthesis made with FRC systems.

  11. On Patellofemoral joint replacement - Clinical, radiological, and numerical studies.

    NARCIS (Netherlands)

    Jonbergen, J.P.W. van

    2011-01-01

    Patellofemoral, osteoarthritis, joint replacement, arthroplasty, anterior knee pain Isolated patellofemoral joint osteoarthritis is a degenerative disorder of the knee estimated to occur in approximately 4% to 24% of patients with osteoarthritis of the knee. Mild isolated patellofemoral

  12. Age Replacement and Service Rate Control of Stochastically Degrading Queues

    National Research Council Canada - National Science Library

    Chapin, Patrick

    2004-01-01

    This thesis considers the problem of optimally selecting a periodic replacement time for a multiserver queueing system in which each server is subject to degradation as a function of the mean service...

  13. Optimization of costs for the DOEL 3 steam generator replacement

    International Nuclear Information System (INIS)

    Leblois, C.

    1994-01-01

    Several aspects of steam generator replacement economics are discussed on the basis of the recent replacement carried out in the Doel 3 unit. The choice between repair of replacement policies, as well as the selection of the intervention date were based on a comparison of costs in which various possible scenarios were examined. The contractual approach for the different works to be performed was also an important point, as well as the project organization in which CAD played an important role. This organization allowed to optimize the outage duration and to realize numerous interventions in the reactor building in parallel with the replacement itself. A last aspect of the optimization of costs is the possibility to uprate the plant power. In the case of Doel 3, the plant restarted with a nominal power increased by 10%, of which 5,7% were possible by the increase of the SG heat transfer area. (Author) 6 refs

  14. Improvements relating to apparatus for emplacing or replacing a gaiter

    International Nuclear Information System (INIS)

    Chilvers, D.; Morrison, D.M.

    1982-01-01

    The invention relates to apparatus for emplacing or replacing a gaiter of the type which may be used in sealing the hot side of an isolation enclosure which is associated with a master-slave manipulator. (author)

  15. Comprehensive Care For Joint Replacement Model - Provider Data

    Data.gov (United States)

    U.S. Department of Health & Human Services — Comprehensive Care for Joint Replacement Model - provider data. This data set includes provider data for two quality measures tracked during an episode of care:...

  16. Hormone Replacement Therapy: MedlinePlus Health Topic

    Science.gov (United States)

    ... of hormone therapy (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hormone Replacement Therapy ... Estrogen overdose Types of hormone therapy Related Health Topics Menopause National Institutes of Health The primary NIH ...

  17. Paired replacement fuel assemblies for BWR-type reactor

    International Nuclear Information System (INIS)

    Oguchi, Kazushige.

    1997-01-01

    There are disposed a large-diameter water rod constituting a non-boiling region at a central portion and paired replacement fuel assemblies for two streams having the same average enrichment degree and different amount of burnable poisons. The paired replacement fuel assemblies comprise a first fuel assembly having a less amount of burnable poisons and a second fuel assembly having a larger amount of burnable poisons. A number of burnable poison-containing fuel rods in adjacent with the large diameter water rod is increased in the second fuel assembly than the first fuel assembly. Then, the poison of the paired replacement fuel assemblies for the BWR type reactor can be annihilated simultaneously at the final stage of the cycle. Accordingly, fuels for a BWR type reactor excellent in economical property and safety and facilitating the design of the replacement reactor core can be obtained. (N.H.)

  18. [Effects of growth hormone replacement therapy on bone metabolism].

    Science.gov (United States)

    Yamamoto, Masahiro; Sugimoto, Toshitsugu

    2014-06-01

    Growth hormone (GH) as well as insulin like growth factor-1 (IGF-1) are essential hormones to maintain homeostasis of bone turnover by activating osteoblastogenesis and osteoclastogenesis. Results from GH replacement therapy for primary osteoporosis and adult-onset GH deficiency (AGHD) suggest that one year or more treatment period by this agent is required to gain bone mineral density (BMD) over the basal level after compensating BMD loss caused by dominant increase in bone resorption which was observed at early phase of GH treatment. A recent meta-analysis demonstrates the efficacy of GH replacement therapy on increases in BMD in male patients with AGHD. Additional analyses are needed to draw firm conclusions in female patients with AGHD, because insufficient amounts of GH might be administrated to them without considerations of influence of estrogen replacement therapy on IGF-1 production. Further observational studies are needed to clarify whether GH replacement therapy prevent fracture risk in these patients.

  19. Total Knee Replacement in A Resource Constrained Environment: A ...

    African Journals Online (AJOL)

    2017-03-06

    Mar 6, 2017 ... care patronage, and the recent trends of religious/faith healings. • Beliefs ... Prevalence and Pattern of Knee Osteoarthritis in a North Eastern. Nigerian Rural ... epidemiology of total knee replacement in South Korea: national.

  20. The cyclops lesion after bicruciate-retaining total knee replacement

    OpenAIRE

    Klaassen, Mark A.; Aikins, Jerry L.

    2017-01-01

    The cyclops lesion is a localized anterior arthrofibrosis most commonly seen following anterior cruciate ligament reconstruction. The lesion forms at the anterior cruciate ligament insertion creating a painful extension block between femoral intercondylar notch and tibial plateau. We present 2 cases (3 knees) in which cyclops lesions appeared atypically following bicruciate-retaining total knee replacement. Two lesions occurred in a single patient following bilateral knee replacement. One les...

  1. Radiological examinations of complications after total hip replacement Pt. 1

    International Nuclear Information System (INIS)

    Luzsa, Gyoergy; Reti, Peter; Lakatos, Jozsef

    1985-01-01

    The radiological findings of complications after total hip replacement are summarized by analizing the data of control examinations of the operated patients at the National Institute for Rheumatology and Physiotherapy. In this first part the types of total hip replacements and the radiological methods (native x-ray, fistulography, arthrography, needle biopsy and scintigraphy using sup(99m)Tc isotope) are surveyed, and the radiological findings of the septic surgical complications are described. (author)

  2. Evaluation of the Effect of Replacing Maize with Cattle Rumen ...

    African Journals Online (AJOL)

    This study determined the nutritive values of cattle rumen waste (CRW) meal used for replacement of maize in the diets of Nile tilapia Oreochromis niloticus. CRW (20.9% CP) was used to replace maize (10.1 CP) at 0%, 25%, 50%, 75% and 100% making diets (D1-D5). The diets were fed to the fish (5.59±0.37g) to apparent ...

  3. Optimal Replacement and Management Policies for Beef Cows

    OpenAIRE

    W. Marshall Frasier; George H. Pfeiffer

    1994-01-01

    Beef cow replacement studies have not reflected the interaction between herd management and the culling decision. We demonstrate techniques for modeling optimal beef cow replacement intervals and discrete management policies by incorporating the dynamic effects of management on future productivity when biological response is uncertain. Markovian decision analysis is used to identify optimal beef cow management on a ranch typical of the Sandhills region of Nebraska. Issues of breeding season l...

  4. Rehabilitation after total joint replacement: a scoping study.

    Science.gov (United States)

    L Snell, Deborah; Hipango, Julia; Sinnott, K Anne; Dunn, Jennifer A; Rothwell, Alastair; Hsieh, C Jean; DeJong, Gerben; Hooper, Gary

    2018-07-01

    The evidence supporting rehabilitation after joint replacement, while vast, is of variable quality making it difficult for clinicians to apply the best evidence to their practice. We aimed to map key issues for rehabilitation following joint replacement, highlighting potential avenues for new research. We conducted a scoping study including research published between January 2013 and December 2016, evaluating effectiveness of rehabilitation following hip and knee total joint replacement. We reviewed this work in the context of outcomes described from previously published research. Thirty individual studies and seven systematic reviews were included, with most research examining the effectiveness of physiotherapy-based exercise rehabilitation after total knee replacement using randomized control trial methods. Rehabilitation after hip and knee replacement whether carried out at the clinic or monitored at home, appears beneficial but type, intensity and duration of interventions were not consistently associated with outcomes. The burden of comorbidities rather than specific rehabilitation approach may better predict rehabilitation outcome. Monitoring of recovery and therapeutic attention appear important but little is known about optimal levels and methods required to maximize outcomes. More work exploring the role of comorbidities and key components of therapeutic attention and the therapy relationship, using a wider range of study methods may help to advance the field. Implications for Rehabilitation Physiotherapy-based exercise rehabilitation after total hip replacement and total knee replacement, whether carried out at the clinic or monitored at home, appears beneficial. Type, intensity, and duration of interventions do not appear consistently associated with outcomes. Monitoring a patient's recovery appears to be an important component. The available research provides limited guidance regarding optimal levels of monitoring needed to achieve gains following hip

  5. Seeking optimal renal replacement therapy delivery in intensive care units.

    Science.gov (United States)

    Kocjan, Marinka; Brunet, Fabrice P

    2010-01-01

    Globally, critical care environments within health care organizations strive to provide optimal quality renal replacement therapy (RRT), an artificial replacement for lost kidney function. Examination of RRT delivery model literature and a case study review of the multidisciplinary-mixed RRT delivery model utilized within a closed medical surgical intensive care unit illustrates the organizational and clinical management of specialized resource and multidisciplinary roles. The successful utilization of a specific RRT delivery model is dependent upon resource availability.

  6. QUALITY OF LIFE, COUNSELLING AND HORMONE REPLACEMENT THERAPY

    Directory of Open Access Journals (Sweden)

    Nena Kopčavar Guček

    2008-12-01

    Quality of life in menopause is a result of many factors and therefore it is very individual.Hormone replacement therapy is one of the possibilities of improvement. Therefore, it isessential that a woman is adequately informed about all the advantages and risks of thehormonal replacement therapy. Only an informed patient can be a partner in shareddecision making about the improvement of quality of life

  7. Credit constraints, consumer leasing and the automobile replacement decision

    OpenAIRE

    Kathleen W. Johnson

    1999-01-01

    This paper presents a model of consumer automobile replacement in the presence of leasing. The model incorporates credit constraints to distinguish between the leasing and purchasing options. It demonstrates how leasing increases the probability that a household replaces its automobile and how households that lease choose higher quality automobiles. The qualitative choice model of the household's decision to lease provides support for the observation that households that lease face credit con...

  8. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  9. Service water system repair/replacement guidelines: Planning and implementation

    International Nuclear Information System (INIS)

    Frederick, G.J.; Gandy, D.W.; Peterson, A.G. Jr.; Findlan, S.J.

    1993-11-01

    Service water system failures have prompted concerns related to extended power plant operating life and plant availability. Selection and procurement of materials for repair or replacement of piping and components may be the most important factors in improving service water system reliability. The authors examined factors that contribute to reduced SWS reliability. The factors include material selection inadequacies, water treatment problems, operational/maintenance practices, fabrication procedures, environmental degradation mechanisms, and coating problems. The authors investigated material selection for replacement and repair, taking into account fabrication practices, environmental concerns, and cost comparisons of materials. They examined specific components such as piping, pumps, valves, and heat exchangers with regard to material selection and fabrication practice. Although proper material selection is essential in upgrading and maintaining the designed functions of a SWS, it is critical to address SWS repair/replacement activities with a systemwide approach. Degradation of materials in SWS applications are plant specific, depending on factors unique to each site such as geographic location, existing materials, operating procedures, and environment. All these characteristics must be addressed in making repair/replacement decisions. Criteria that must be integrated for successful long-term operation of SWS include the following: Materials selection (upgrade or in-kind replacement), Evaluation of root cause or nature of the failure mechanism, Scope of the repair/replacement activities, Material compatibility of the existing materials, Operational and maintenance procedures, Code or jurisdictional requirements, Economic considerations, Water treatment programs, System design improvements or modifications

  10. Midterm Results of Aortic Valve Replacement with Cryopreserved Homografts

    Directory of Open Access Journals (Sweden)

    Emre Özker

    2012-06-01

    Full Text Available Objective: The aim of this study was to analyze the midterm clinical results of aortic valve replacement with cryopreserved homografts.Materials and Methods: Aortic valve replacement was performed in 40 patients with cryopreserved homograft. The indications were aortic valve endocarditis in 20 patients (50%, truncus arteriosus in 6 patients (15%, and re-stenosis or regurtitation after aortic valve reconstruction in 14 (35% patients. The valve sizes ranged from 10 to 27mm. A full root replacement technique was used for homograft replacement in all patients.Results: The 30-day postoperative mortality rate was 12.5% (5 patients. There were four late deaths. Only one of them was related to cardiac events. Overall mortality was 22.5%. Thirty-three patients were followed up for 67±26 months. Two patients needed reoperation due to aortic aneurysm caused by endocarditis. The mean transvalvular gradient significantly decreased after valve replacement (p<0.003. The last follow up showed that the 27 (82% patients had a normal left ventricular function.Conclusion: Cryopreserved homografts are safe alternatives to mechanical valves that can be used when there are proper indications. Although it has a high perioperative mortality rate, cryopreserved homograft implantation is an alternative for valve replacement, particularly in younger patients and for complex surgical problems such as endocarditis that must be minimalized.

  11. Esophageal replacement in children: Challenges and long-term outcomes

    Directory of Open Access Journals (Sweden)

    Giampiero Soccorso

    2016-01-01

    Full Text Available Replacement of a nonexistent or damaged esophagus continues to pose a significant challenge to pediatric surgeons. Various esophageal replacement grafts and techniques have not produced consistently good outcomes to emulate normal esophagus. Therefore, many techniques are still being practiced and recommended with no clear consensus. We present a concise literature review of the currently used techniques and with discussions on the advantages and anticipated morbidity. There are no randomized controlled pediatric studies to compare different types of esophageal replacements. Management and graft choice are based on geographical and personal predilections rather than on any discernible objective data. The biggest series with long-term outcome are reported for gastric transposition and colonic replacement. Comparison of different studies shows no significant difference in early (graft necrosis and anastomotic leaks or late complications (strictures, poor feeding, gastro-esophageal reflux, tortuosity of the graft, and Barrett′s esophagus. The biggest series seem to have lower complications than small series reflecting the decennials experience in their respective centers. Long-term follow-up is recommended following esophageal replacement for the development of late strictures, excessive tortuosity, and Barrett′s changes within the graft. Once child overcomes initial morbidity and establishes oral feeding, long-term consequences and complications of pediatric esophageal replacement should be monitored and managed in adult life.

  12. Some economic aspects of steam generator replacements in nuclear power plants

    International Nuclear Information System (INIS)

    Lebegner, J.

    1995-01-01

    The steam generator replacements performed over last decade (about 25 replacements until now), indicate trends towards improved techniques, shorter schedules and reduced total exposure and total costs. The goal of this paper is to give a worldwide review of SG replacement experience with accent on the economic aspect of the SG replacement. The main information about carried out replacements will be presented: cost, schedules, exposures, SG supplier and type, date of replacement, etc. Furthermore, the paper will contain the list of planned steam generator replacements in Europe, Japan and US future replacement plans. Finally, some of NPPs will be described whose initial nominal power has been increased along with SG replacement. (author)

  13. The use of transcatheter aortic valve replacement vs surgical aortic valve replacement for the treatment of aortic stenosis

    Directory of Open Access Journals (Sweden)

    Jensen HA

    2015-08-01

    Full Text Available Hanna A Jensen, Lillian L Tsai, Vinod H Thourani Division of Cardiothoracic Surgery, Joseph B Whitehead Department of Surgery, Structural Heart and Valve Center, Emory University School of Medicine, Atlanta, GA, USA Abstract: Severe aortic stenosis (AS is associated with considerable morbidity and mortality and is increasing in prevalence as the global population increases. Since AS primarily affects the elderly, many of these patients have comorbidities that make them poor candidates for the gold standard treatment for AS, surgical aortic valve replacement. Transcatheter aortic valve replacement has emerged as a novel technology for the management of AS in higher risk patients over the past decade. Randomized trials have established the safety and efficacy of transcatheter aortic valve replacement, and the medical community has rallied to identify the patients who are most suitable for this transformative treatment. This review focuses on outlining the key procedural differences, describing the unique challenges of both operations, and finally assessing and comparing outcomes both on a general level and in challenging patient subgroups. Keywords: aortic valve replacement, transcatheter aortic valve replacement, surgical aortic valve replacement 

  14. Fractal dimension evolution and spatial replacement dynamics of urban growth

    International Nuclear Information System (INIS)

    Chen Yanguang

    2012-01-01

    Highlights: ► The fractal dimension growth can be modeled by Boltzmann’s equation. ► Boltzmann’s model suggests urban spatial replacement dynamics. ► If the rate of urban growth is too high, periodic oscillations or chaos will arise. ► Chaos is associated with fractals by the fractal dimension evolution model. ► The fractal dimension of urban form implies the space-filling ratio of a city. - Abstract: This paper presents a new perspective of looking at the relation between fractals and chaos by means of cities. Especially, a principle of space filling and spatial replacement is proposed to interpret the fractal dimension of urban form. The fractal dimension evolution of urban growth can be empirically modeled with Boltzmann’s equation. For the normalized data, Boltzmann’s equation is just equivalent to the logistic function. The logistic equation can be transformed into the well-known 1-dimensional logistic map, which is based on a 2-dimensional map suggesting spatial replacement dynamics of city development. The 2-dimensional recurrence relations can be employed to generate the nonlinear dynamical behaviors such as bifurcation and chaos. A discovery is thus made in this article that, for the fractal dimension growth following the logistic curve, the normalized dimension value is the ratio of space filling. If the rate of spatial replacement (urban growth) is too high, the periodic oscillations and chaos will arise. The spatial replacement dynamics can be extended to general replacement dynamics, and bifurcation and chaos mirror a process of complex replacement.

  15. Meal Replacement Mass Reduction Integration and Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Douglas, G.; Schneiderman, J.; Slack, K.; Whitmire, A.; Williams, T.; Young, M.

    2018-01-01

    The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore we are challenged to reduce the mass of the food system by 10% while maintaining safety, nutrition, and acceptability to support crew health and performance for exploration missions. Meal replacement with nutritionally balanced, 700-900 calorie bars was identified as a method to reduce mass. However, commercially available products do not meet the requirements for a meal replacement in the spaceflight food system. The purpose of this task was to develop a variety of nutritionally balanced, high quality, breakfast replacement bars, which enable a 10% food mass savings. To date, six nutrient-dense meal replacement bars have been developed, all of which meet spaceflight nutritional, microbiological, sensory, and shelf-life requirements. The four highest scoring bars were evaluated based on final product sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. color and texture), and microbiological compliance over a period of two years to predict long-term acceptability. All bars maintained overall acceptability throughout the first year of storage, despite minor changes in color and texture. However, added vitamins C, B1, and B9 degraded rapidly in fortified samples of Banana Nut bars, indicating the need for additional development. In addition to shelf-life testing, four bar varieties were evaluated in the Human Exploration Research Analog (HERA), campaign 3, to assess the frequency with which actual meal replacement options may be implemented, based on impact to satiety and psychosocial measurements. Crewmembers (n=16) were asked to consume meal replacement bars every day for the first fifteen days of the mission and every three days for the second half of the mission. Daily surveys assessed the crew's responses to bar acceptability, mood, food fatigue and perceived stress. Preliminary results indicate that the

  16. Structural Evaluation of the RSRM Nozzle Replacement Adhesive

    Science.gov (United States)

    Batista-Rodriguez, A.; McLennan, M. L.; Palumbos, A. V.; Richardson, D. E.

    1999-01-01

    This paper describes the structural performance evaluation of a replacement adhesive for the Reusable Solid Rocket Motor (RSRM) nozzle utilizing finite element analysis. Due to material obsolescence and industrial safety issues, the two current structural adhesives, EA 913 and EA 946 are to be replaced with a new adhesive. TIGA 321. The structural evaluation in support of the adhesive replacement effort includes residual stress, transportation, and flight analyses. Factors of safety are calculated using the stress response from each analysis. The factors of safety are used as the limiting criteria to compare the replacement adhesive against the current adhesives. Included in this paper are the analytical approach, assumptions and modeling techniques as well as the results of the evaluation. An important factor to the evaluation is the similarity in constitutive material properties (elastic modulus and Poisson's ratio) between TIGA 321 and EA 913. This similarity leads to equivalent material response from the two adhesives. However, TIGA 321 surpasses EA 913's performance due to higher material capabilities. Conversely, the change in stress response from EA 946 to TIGA 321 is more apparent: this is primarily attributed to the difference in the modulii of the two adhesives, which differ by two orders of magnitude. The results of the bondline evaluation indicate that the replacement adhesive provides superior performance than the current adhesives with only minor exceptions. Furthermore, TIGA 321 causes only a minor chance in the response of the phenolic and metal components.

  17. A general approach to total repair cost limit replacement policies

    Directory of Open Access Journals (Sweden)

    F. Beichelt

    2014-01-01

    Full Text Available A common replacement policy for technical systems consists in replacing a system by a new one after its economic lifetime, i.e. at that moment when its long-run maintenance cost rate is minimal. However, the strict application of the economic lifetime does not take into account the individual deviations of maintenance cost rates of single systems from the average cost development. Hence, Beichet proposed the total repair cost limit replacement policy: the system is replaced by a new one as soon as its total repair cost reaches or exceeds a given level. He modelled the repair cost development by functions of the Wiener process with drift. Here the same policy is considered under the assumption that the one-dimensional probability distribution of the process describing the repair cost development is given. In the examples analysed, applying the total repair cost limit replacement policy instead of the economic life-time leads to cost savings of between 4% and 30%. Finally, it is illustrated how to include the reliability aspect into the policy.

  18. Experimental replacement of esophagus with a short segment of trachea.

    Science.gov (United States)

    Abbasidezfouli, Azizollah; Ansari, Damoon; Sheikhy, Kambiz; Abarkar, Mohammad; Sadeghbeigi, Farahnaz; Abbasidezfouli, Sepehr; Sharifi, Davood

    2016-03-01

    Segmental resection of esophagus with primary anastomosis is prohibited because of the risk of dehiscence. We previously have shown that replacement of a segment of cervical esophagus with a tracheal segment of the same length could successfully be performed in a canine model. In this study, we sought to assess the feasibility of replacement of the esophageal defect with a shorter segment of trachea. In five mongrel dogs weighting 20-30 kg, under general anesthesia and after a cervical incision, 8 cm of the cervical esophagus was resected and replaced by a 4-cm segment of the adjacent trachea. The animals were evaluated clinically for signs and symptoms of stenosis and dehiscence and then euthanized after 2 mo of follow-up. All dogs recovered from surgery and started regular diet on the seventh postoperative day. No clinical or endoscopic sign of stenosis or voice change was seen. Squamous metaplasia and atrophy of mucosal glands and cartilage were detected in the histopathologic examination of the replaced segments. Replacement of a cervical esophageal defect with a shorter segment of trachea can be performed successfully in dogs. This procedure can be potentially used for the treatment of cervical esophageal lesions in humans. Copyright © 2016 Elsevier Inc. All rights reserved.

  19. Joint Replacement Surgery: Health Information Basics for You and Your Family

    Science.gov (United States)

    ... Initiative Breadcrumb Home Health Topics English Español Joint Replacement Surgery Basics In-Depth Download Download EPUB Download ... What is it? Points To Remember About Joint Replacement Surgery Joint replacement surgery removes damaged or diseased ...

  20. 42 CFR 84.194 - Filters used with chemical cartridges; location; replacement.

    Science.gov (United States)

    2010-10-01

    ...; replacement. 84.194 Section 84.194 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN...; replacement. (a) Particulate matter filters used in conjunction with a chemical cartridge shall be located on... replacement on the cartridge. ...

  1. 78 FR 26383 - Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement...

    Science.gov (United States)

    2013-05-06

    ... Proposed Increase in Operation, Maintenance and Replacement Activities Associated With the Wasatch County... of potential impacts associated with a proposed change in Operation, Maintenance and Replacement..., Maintenance, and Replacement Proposed Action includes: stabilizing canal banks; lining, piping, or enclosing...

  2. Failure rate of cemented and uncemented total hip replacements

    DEFF Research Database (Denmark)

    Makela, K. T.; Matilainen, M.; Pulkkinen, P.

    2014-01-01

    ). Participants 347 899 total hip replacements performed during 1995-2011. Main outcome measures Probability of implant survival (Kaplan-Meier analysis) along with implant survival with revision for any reason as endpoint (Cox multiple regression) adjusted for age, sex, and diagnosis in age groups 55-64, 65......Objective To assess the failure rate of cemented, uncemented, hybrid, and reverse hybrid total hip replacements in patients aged 55 years or older. Design Register study. Setting Nordic Arthroplasty Register Association database (combined data from Sweden, Norway, Denmark, and Finland......-74, and 75 years or older. Results The proportion of total hip replacements using uncemented implants increased rapidly towards the end of the study period. The 10 year survival of cemented implants in patients aged 65 to 74 and 75 or older (93.8%, 95% confidence interval 93.6% to 94.0% and 95.9%, 95...

  3. Clinical and radiographic evaluation of modular knee replacement

    International Nuclear Information System (INIS)

    Cartier, P.; Mammeri, M.; Villers, P.

    1982-01-01

    Ninety-five modular total knee replacements, 54 of them unicompartmental, have been reviewed. The average follow-up was three years. The major indication for operation was pain. A precise preoperative radiographic evaluation and a technique for a positioning the components are described. This had led to a significant improvement in the clinical and radiographic results in 67 out of 95 knees which were operated on. The modifications concern the orientation of the tibial cut, the placing of the femoral components and the correction of axial deviation. The main causes of the 13% of failures in our series were either errors in positioning the components or a preoperative diagnosis of rheumatoid arthritis. Unicompartmental replacement gave similar results in both valgus and varus knees, and the morbidity was lower than in the bicompartmental replacements. The best results were obtained in osteoarthristic knees in elderly patients and in posttraumatic osteoarthritis. (orig.)

  4. Special features of total knee replacement in hemophilia.

    Science.gov (United States)

    Rodriguez-Merchan, Emerito Carlos

    2013-12-01

    Total knee replacement is an operation frequently needed by hemophilia patients, which greatly improves their quality of life. This operation, however, carries a higher risk of bleeding and infection for hemophiliacs than it does for osteoarthritis sufferers. It is advisable to implant prosthetic components using antibiotic-loaded cement. It is essential to maintain a level of 100% of the replacement clotting factor for 2 weeks. Hematological treatment must be established, depending on the patient's factor levels and other pharmacokinetic parameters such as recovery and half-life, optimal doses and treatment time. It is preferable to use general anesthesia due to the risk of spinal bleeding. The lifespan of total knee replacement in hemophilic patients is shorter than in patients with osteoarthritis because of the increased risk of infection.

  5. Utilization of mine tailings as partial cement replacement

    DEFF Research Database (Denmark)

    Sigvardsen, Nina Marie; Nielsen, M.R.; Ottosen, Lisbeth M.

    2017-01-01

    Depositing mine tailings entail major economic costs and negative environmental impacts. Thus finding an alternative to depositing is of interest. This study focused on the use of mine tailings as partial cement replacement, thereby preventing depositing the mine tailings. At the same time......, such use would reduce the CO2 emission related to the production of cement. Mine tailings from two different mines Zinkgruvan (Sweden) and Nalunaq (Greenland) were both tested as 5 and 10 % cement replacement. All mortar specimens with mine tailings had lower compressive strength compared to a reference...... compared to a specimen containing a 10 % replacement of cement with coal fly ash, commonly used in Denmark. The compressive strength of specimens containing mine tailings exceeded the compressive strength of the specimen containing coal fly ash, indicating further the amorphous content of volcanic decent...

  6. Prosthetic valve sparing aortic root replacement: an improved technique.

    Science.gov (United States)

    Leacche, Marzia; Balaguer, Jorge M; Umakanthan, Ramanan; Byrne, John G

    2008-10-01

    We describe a modified surgical technique to treat patients with a previous history of isolated aortic valve replacement who now require aortic root replacement for an aneurysmal or dissected aorta. This technique consists of replacing the aortic root with a Dacron conduit, leaving intact the previously implanted prosthesis, and re-implanting the coronary arteries in the Dacron graft. Our technique differs from other techniques in that we do not leave behind any aortic tissue remnant and also in that we use a felt strip to obliterate any gap between the old sewing ring and the newly implanted graft. In our opinion, this promotes better hemostasis. We demonstrate that this technique is safe, feasible, and results in acceptable outcomes.

  7. Moderator inlet line hanger replacement for Pickering nuclear power station

    International Nuclear Information System (INIS)

    Kirkpatrick, R.A.; Bowman, J.M.; Symmons, W.R.; El-Nesr, S.

    1988-01-01

    Ontario Hydro's Pickering Nuclear Generating Station (PNGS), Units 1 and 2 were shutdown for large scale fuel channel replacement. Other nonroutine inspection and maintenance activities were performed to determine the overall condition of the units and it was seen that a moderator inlet line hanger (identified as HR-29) had failed in both units. Subsequent inspections during planned maintenance outages of Pickering NGS Units 3 and 4 revealed that hanger HR-29 had failed and required replacement. A research program was conducted to find a suitable technique. These problems included accessing tooling through small inspection ports, manipulating tooling from a significant distance and the high radiation fields within the vault. This paper describes the program undertaken to replace hanger HR-29. (author)

  8. Applications of molecular replacement to G protein-coupled receptors

    International Nuclear Information System (INIS)

    Kruse, Andrew C.; Manglik, Aashish; Kobilka, Brian K.; Weis, William I.

    2013-01-01

    The use of molecular replacement in solving the structures of G protein-coupled receptors is discussed, with specific examples being described in detail. G protein-coupled receptors (GPCRs) are a large class of integral membrane proteins involved in regulating virtually every aspect of human physiology. Despite their profound importance in human health and disease, structural information regarding GPCRs has been extremely limited until recently. With the advent of a variety of new biochemical and crystallographic techniques, the structural biology of GPCRs has advanced rapidly, offering key molecular insights into GPCR activation and signal transduction. To date, almost all GPCR structures have been solved using molecular-replacement techniques. Here, the unique aspects of molecular replacement as applied to individual GPCRs and to signaling complexes of these important proteins are discussed

  9. [Valve-sparing Replacement in Patients with Aortic Root Dilatation].

    Science.gov (United States)

    Yamazaki, Kazuhiro; Minatoya, Kenji; Ueda, Ryoma; Takehara, Masato; Sakamoto, Kazuhisa; Ide, Yujiro; Kanemitsu, Hideo; Ueyama, Koji; Ikeda, Tadashi

    2018-01-01

    Valve-sparing root replacement is increasingly used to overcome drawbacks associated with valvular prostheses. In our institution, 7 patients underwent valve-sparing root replacement from August 2016 to July 2017. The mean age was 45 years (range, 14~69 years). Three patients had Marfan syndrome and 1 had Loeys-Dietz syndrome with acute aortic dissection. All patients underwent surgery with reimplantation technique using a Valsalva graft. Two patients required repair of aortic valve leaflet prolapse. All patients had an excellent clinical course, with mild or no aortic regurgitation and a decrease in end-diastolic volume on echocardiography. These results support the continued use of valve-sparing root replacement in selected patients.

  10. [Panhypopituitarism in one identical twin: the effect of hormone replacement].

    Science.gov (United States)

    Del Canho, Harrij; van Alfen-van der Velden, Janiëlle; del Canho, Riwka; Otten, Barto

    2011-01-01

    Panhypopituitarism in childhood is rare. It is even rarer if the disorder appears in a boy with an identical but healthy twin brother. In such a patient it is useful to study the consequences of the hormone disorder and the effect of hormone replacement. A 6-year-old boy saw a paediatrician because of short stature. He was much shorter than his identical twin brother and he had more abdominal fat mass and a smaller penis. Laboratory tests identified hypothyroidism of central origin, in combination with hypocortisolism and growth hormone deficiency. Hormonal replacement resulted in an improvement in growth rate. At the age of 15 years, testosterone therapy was introduced because puberty had not occurred and his growth rate was low. Finally the patient grew a few centimetres taller than his twin brother. In the first year of life, panhypopituitarism has no negative consequences for growth. After this point, growth is clearly delayed. With sufficient replacement growth can completely catch up.

  11. The replacement of serum by hormones in cell culture media.

    Science.gov (United States)

    Sato, G; Hayashi, I

    1976-12-01

    The replacement of serum by hormones in cell culture media. (Reemplazo del suero por hormonas en el medio de cultivo de células). Arch. Biol. Med. Exper. 10: 120-121, 1976. The serum used in cell culture media can be replaced by a mixture of hormones and some accesory blood factors. The pituitary cell line GH3 can be grown in a medium in which serum is replaced by triiodothyronine, transferrin, parathormone, tyrotrophin releasing hormone and somatomedins. Hela and BHK cell strains can also be grown in serum free medium supplemented with hormones. Each cell type appears to have different hormonal requirements yet it may found that some hormones are required for most cell types.

  12. Environmentally Optimal, Nutritionally Aware Beef Replacement Plant-Based Diets.

    Science.gov (United States)

    Eshel, Gidon; Shepon, Alon; Noor, Elad; Milo, Ron

    2016-08-02

    Livestock farming incurs large and varied environmental burdens, dominated by beef. Replacing beef with resource efficient alternatives is thus potentially beneficial, but may conflict with nutritional considerations. Here we show that protein-equivalent plant based alternatives to the beef portion of the mean American diet are readily devisible, and offer mostly improved nutritional profile considering the full lipid profile, key vitamins, minerals, and micronutrients. We then show that replacement diets require on average only 10% of land, 4% of greenhouse gas (GHG) emissions, and 6% of reactive nitrogen (Nr) compared to what the replaced beef diet requires. Applied to 320 million Americans, the beef-to-plant shift can save 91 million cropland acres (and 770 million rangeland acres), 278 million metric ton CO2e, and 3.7 million metric ton Nr annually. These nationwide savings are 27%, 4%, and 32% of the respective national environmental burdens.

  13. Replacement of the instrumentation and control system of Tore Supra

    International Nuclear Information System (INIS)

    Leveque, P.

    1995-02-01

    The control system of the Tore-Supra is a wide and complex system that cannot be interrupted while running without significant consequences on the operating of the machine. Replacing the current system cannot be achieved in a global way without immobilisation and high costs. Therefore partial changes have been decided on. This work presents the detailed analysis of the arrangements and the operating of the system that will be replaced: the pro's and con's that have appeared through experience are related. The possibilities that the new apparatus offers are also examined. A method of step by step replacements had to be set up in order to assess the means, funds, term of achievement, performance and quality of the overall project. (TEC). 15 refs., 29 figs

  14. In this issue: Time to replace doctors’ judgement with computers

    Directory of Open Access Journals (Sweden)

    Simon de Lusignan

    2015-11-01

    Full Text Available Informaticians continue to rise to the challenge, set by the English Health Minister, of trying to replace doctors’ judgement with computers. This issue describes successes and where there are barriers. However, whilst there is progress this tends to be incremental and there are grand challenges to be overcome before computers can replace clinician. These grand challenges include: (1 improving usability so it is possible to more readily incorporate technology into clinical workflow; (2 rigorous new analytic methods that make use of the mass of available data, ‘Big data’, to create real-world evidence; (3 faster ways of meeting regulatory and legal requirements including ensuring privacy; (4 provision of reimbursement models to fund innovative technology that can substitute for clinical time and (5 recognition that innovations that improve quality also often increase cost. Informatics more is likely to support and augment clinical decision making rather than replace clinicians.

  15. Opportunity-based age replacement policy with minimal repair

    International Nuclear Information System (INIS)

    Jhang, J.P.; Sheu, S.H.

    1999-01-01

    This paper proposes an opportunity-based age replacement policy with minimal repair. The system has two types of failures. Type I failures (minor failures) are removed by minimal repairs, whereas type II failures are removed by replacements. Type I and type II failures are age-dependent. A system is replaced at type II failure (catastrophic failure) or at the opportunity after age T, whichever occurs first. The cost of the minimal repair of the system at age z depends on the random part C(z) and the deterministic part c(z). The opportunity arises according to a Poisson process, independent of failures of the component. The expected cost rate is obtained. The optimal T * which would minimize the cost rate is discussed. Various special cases are considered. Finally, a numerical example is given

  16. Preoperative Education for Hip and Knee Replacement: Never Stop Learning.

    Science.gov (United States)

    Edwards, Paul K; Mears, Simon C; Lowry Barnes, C

    2017-09-01

    Participation in alternative payment models has focused efforts to improve outcomes and patient satisfaction while also lowering cost for elective hip and knee replacement. The purpose of this review is to determine if preoperative education classes for elective hip and knee replacement achieve these goals. Recent literature demonstrates that patients who attend education classes prior to surgery have decreased anxiety, better post-operative pain control, more realistic expectations of surgery, and a better understanding of their surgery. As a result, comprehensive clinical pathways incorporating a preoperative education program for elective hip and knee replacement lead to lower hospital length of stay, higher home discharge, lower readmission, and improved cost. In summary, we report convincing evidence that preoperative education classes are an essential element to successful participation in alternative payment models such as the Bundle Payment Care Initiative.

  17. Face-specific Replacement of Calcite by Amorphous Silica Nanoparticles

    Science.gov (United States)

    Liesegang, M.; Milke, R.; Neusser, G.; Mizaikoff, B.

    2016-12-01

    Amorphous silica, composed of nanoscale spheres, is an important biomineral, alteration product of silicate rocks on the Earth's surface, and precursor material for stable silicate minerals. Despite constant progress in silica sphere synthesis, fundamental knowledge of natural silica particle interaction and ordering processes leading to colloidal crystals is absent so far. To understand the formation pathways of silica spheres in a geologic environment, we investigated silicified Cretaceous mollusk shell pseudomorphs from Coober Pedy (South Australia) using focused ion beam (FIB)-SEM tomography, petrographic microscopy, µ-XRD, and EMPA. The shells consist of replaced calcite crystals (ionic strength remain constant throughout the replacement process, permitting continuous silica nanoparticle formation and diffusion-limited colloid aggregation. Our study provides a natural example of the transformation of an atomic crystal to an amorphous, mesoscale ordered material; thus, links the research fields of natural colloidal crystal formation, carbonate-silica replacement, and crystallization by oriented particle aggregation (CPA).

  18. Spontaneous Coronary Artery Dissection following Topical Hormone Replacement Therapy

    Directory of Open Access Journals (Sweden)

    Alexander L. Pan

    2012-01-01

    Full Text Available Spontaneous coronary artery dissection is a rare condition, usually presenting as an acute coronary syndrome, and is often seen in states associated with high systemic estrogen levels such as pregnancy or oral contraceptive use. While topical hormonal replacement therapy may result in increased estrogen levels similar to those documented with oral contraceptive use, there are no reported cases of spontaneous coronary dissection with topical hormonal replacement therapy. We describe a 53-year-old female who developed two spontaneous coronary dissections while on topical hormonal replacement therapy. The patient had no other risk factors for coronary dissection. After withdrawal from topical hormonal therapy, our patient has done well and has not had recurrent coronary artery dissections over a one-year follow-up period. The potential contributory role of topical hormonal therapy as a cause of spontaneous coronary dissection should be recognized.

  19. Respondent-Driven Sampling – Testing Assumptions: Sampling with Replacement

    Directory of Open Access Journals (Sweden)

    Barash Vladimir D.

    2016-03-01

    Full Text Available Classical Respondent-Driven Sampling (RDS estimators are based on a Markov Process model in which sampling occurs with replacement. Given that respondents generally cannot be interviewed more than once, this assumption is counterfactual. We join recent work by Gile and Handcock in exploring the implications of the sampling-with-replacement assumption for bias of RDS estimators. We differ from previous studies in examining a wider range of sampling fractions and in using not only simulations but also formal proofs. One key finding is that RDS estimates are surprisingly stable even in the presence of substantial sampling fractions. Our analyses show that the sampling-with-replacement assumption is a minor contributor to bias for sampling fractions under 40%, and bias is negligible for the 20% or smaller sampling fractions typical of field applications of RDS.

  20. Cassava dreg as replacement of corn in goat kid diets.

    Science.gov (United States)

    Ferraz, Lucíola Vilarim; Guim, Adriana; Véras, Robson Magno Liberal; de Carvalho, Francisco Fernando Ramos; de Freitas, Marciela Thais Dino

    2018-02-01

    The effects of corn replacement by cassava dreg in diets of crossbred goat kids were evaluated. We tested the impacts of 0, 33, 66 and 100% replacement on intake, digestibility, feeding behaviour, performance and carcass characteristics. Thirty-six goat kids, aged between 4 and 5 months and with initial body weights of 17.61 ± 1.98 kg, were used in a completely randomised design. Analysis of regression revealed a negative linear effect on neutral detergent fibre (NDF) intake and a positive linear effect on non-fibrous carbohydrates (NFC) and hydrocyanic acids (HCN) intake. Cassava dreg use had a positive linear effect on organic matter digestibility and non-fibrous carbohydrates. Based on our results, cassava dreg use did not negatively impact animal performance, feeding behaviour and carcass characteristics, suggesting that it may replace corn up to 100% in the diets of confined goat kids.

  1. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  2. TOTAL KNEE REPLACEMENT IN PATIENTS WITH BELOW-KNEE AMPUTATION

    Science.gov (United States)

    Karam, Matthew D; Willey, Michael; Shurr, Donald G

    2010-01-01

    Total knee replacement (TKR) is reserved for patients with severe and disabling arthritis that is non-responsive to conservative measures. Based on existing data, total knee replacement is a safe and cost-effective treatment for alleviating pain and improving physical function in patients who do not respond to conservative therapy. Despite the large variation in health status of patients and types of prosthesis implanted, total knee replacement has proven to be a relatively low risk and successful operation. Each year in the United States surgeons perform approximately 300,000 TKR.1 Likewise, lower extremity amputation is commonly performed in the United States with an annual incidence of 110,000 per year.2 Nearly 70% of all lower extremity amputations are performed as the result of chronic vascular disease, followed by trauma (22%), congenital etiology and tumor (4% each).3 Approximately 50% of all lower extremity amputations are performed secondary to complications from Diabetes Mellitus. Norvell et al. demonstrated that patients who have previously undergone transtibial amputation and ambulate with a prosthesis are more likely to develop degenerative joint disease in the con-tralateral extremity than the ipsilateral extremity.4 Further, radiographic changes consistent with osteoporosis have been demonstrated in up to 88% of limbs that have undergone transtibial amputation.8 To our knowledge, there have been only three reported cases of total knee replacement in patients with ipsilateral transtibial amputation.5,7 The purpose of the present study is to review the existing data on total knee replacement in patients who have undergone transtibial amputation. Further we present a patient with a transtibial amputation who underwent contralateral total knee replacement. PMID:21045987

  3. Meal Replacement Mass Reduction and Integration Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Barrett, A.; Richardson, M.; Arias, D.; Schneiderman, J.; Slack, K.; Williams, T.; Douglas, G.

    2017-01-01

    NASA, in planning for long-duration missions, has an imperative to provide a food system with the necessary nutrition, acceptability, and safety to ensure sustainment of crew health and performance. The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore the team is challenged to reduce the mass of the food system by 10% while maintaining product safety, nutrition, and acceptability. Commercially available products do not meet the nutritional requirements for a full meal replacement in the spaceflight food system, and it is currently unknown if daily meal replacements will impact crew food intake and psychosocial health over time. The purpose of this study was to develop a variety of nutritionally balanced breakfast replacement bars that meet spaceflight nutritional, microbiological, sensorial, and shelf-life requirements, while enabling a 10% savings in food mass. To date, six nutrient-dense meal replacement bars (approximately 700 calories per bar) have been developed, using traditional methods of compression as well as novel ultrasonic compression technologies developed by Creative Resonance Inc. (Phoenix, AZ). The four highest rated bars were evaluated in the Human Exploration Research Analog (HERA) to assess the frequency with which actual meal replacement options may be implemented. Specifically, overall impact of bars on mood, satiety, digestive discomfort, and satisfaction with food. These factors are currently being analyzed to inform successful implementation strategies where crew maintain adequate food intake. In addition, these bars are currently undergoing shelf-life testing to determine long-term sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. water activity and texture), and microbiological compliance over two years of storage at room temperature and potential temperature abuse conditions to predict long-term acceptability. It is expected that

  4. Aortic Root Replacement for Children With Loeys-Dietz Syndrome.

    Science.gov (United States)

    Patel, Nishant D; Alejo, Diane; Crawford, Todd; Hibino, Narutoshi; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2017-05-01

    Loeys-Dietz syndrome (LDS) is an aggressive aortopathy with a proclivity for aortic aneurysm rupture and dissection at smaller diameters than other connective tissue disorders. We reviewed our surgical experience of children with LDS to validate our guidelines for prophylactic aortic root replacement (ARR). We reviewed all children (younger than 18 years) with a diagnosis of LDS who underwent ARR at our institution. The primary endpoint was mortality, and secondary endpoints included complications and the need for further interventions. Thirty-four children with LDS underwent ARR. Mean age at operation was 10 years, and 15 (44%) were female. Mean preoperative root diameter was 4 cm. Three children (9%) had composite ARR with a mechanical prosthesis, and 31 (91%) underwent valve-sparing ARR. Concomitant procedures included arch replacement in 2 (6%), aortic valve repair in 1 (3%), and patent foramen ovale closure in 16 (47%). There was no operative mortality. Two children (6%) required late replacement of the ascending aorta, 5 (15%) required arch replacement, 1 (3%) required mitral valve replacement, and 2 (6%) had coronary button aneurysms/pseudoaneurysms requiring repair. Three children required redo valve-sparing ARR after a Florida sleeve procedure, and 2 had progressive aortic insufficiency requiring aortic valve replacement after a valve-sparing procedure. There were 2 late deaths (6%). These data confirm the aggressive aortopathy of LDS. Valve-sparing ARR should be performed when feasible to avoid the risks of prostheses. Serial imaging of the arterial tree is critical, given the rate of subsequent intervention. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  5. Radiological difficulty in identifying unicompartmental knee replacement dislocation

    Directory of Open Access Journals (Sweden)

    Mr Oruaro Adebayo Onibere, MBBS, MRCS

    2017-09-01

    Full Text Available Unicondylar knee replacement is a relatively common elective orthopedic procedure but is not often seen in the Emergency Department setting. Familiarity with normal clinical and radiological appearances is difficult to gain. Dislocation of the mobile bearing component “spacer” is a known complication of unicondylar knee replacements, and these patients will initially present to the accident and Emergency Department. In this setting, an accurate and prompt diagnosis is necessary to appropriately manage the patient's condition. There is normally a radiological challenge in identifying dislocated mobile bearings on plain radiographs. These patients may need to have further imaging, such as a computer tomographic scan to identify the dislocated mobile bearing.

  6. New protein involved in the replacement of cell molecules

    DEFF Research Database (Denmark)

    Poulsen, Jesper Buchhave

    2011-01-01

    In collaboration with colleagues from La Trobe University, Australia, scientists at Aarhus University have discovered and defined a novel enzyme involved in the replacement and renewal of cell molecules. The enzyme exerts its function within the so-called mitochondria - small “enclosed” compartme......In collaboration with colleagues from La Trobe University, Australia, scientists at Aarhus University have discovered and defined a novel enzyme involved in the replacement and renewal of cell molecules. The enzyme exerts its function within the so-called mitochondria - small “enclosed...

  7. Apixaban or enoxaparin for thromboprophylaxis after knee replacement

    DEFF Research Database (Denmark)

    Lassen, Michael Rud; Raskob, Gary E; Gallus, Alexander

    2009-01-01

    BACKGROUND: The optimal strategy for thromboprophylaxis after major joint replacement has not been established. Low-molecular-weight heparins such as enoxaparin predominantly target factor Xa but to some extent also inhibit thrombin. Apixaban, a specific factor Xa inhibitor, may provide effective...... (P=0.03). CONCLUSIONS: As compared with enoxaparin for efficacy of thromboprophylaxis after knee replacement, apixaban did not meet the prespecified statistical criteria for noninferiority, but its use was associated with lower rates of clinically relevant bleeding and it had a similar adverse...

  8. Total knee replacement in patients with diffuse villonodular synovitis

    Directory of Open Access Journals (Sweden)

    Lucio Flávio Biondi Pinheiro Júnior

    Full Text Available ABSTRACT This paper reports a case of diffuse pigmented villonodular synovitis (DPVNS, associated with advanced gonarthrosis, submitted to total knee replacement. The patient had progressive pain and swelling. She had two previous surgeries, firstly arthroscopic , synovectomy and subsequently open synovectomy associated with radiotherapy, with recurrence of the disease. Magnetic resonance imaging revealed diffuse synovitis, advanced arthrosis, and bone cysts. The patient was submitted to a total knee replacement and synovectomy. There was a good postoperative clinical course, with improvement of pain, function, and joint edema on examination. The patient will be followed regarding the possibility of disease recurrence and implant survival.,

  9. The cyclops lesion after bicruciate-retaining total knee replacement

    Directory of Open Access Journals (Sweden)

    Mark A. Klaassen, MD, FACS

    2017-12-01

    Full Text Available The cyclops lesion is a localized anterior arthrofibrosis most commonly seen following anterior cruciate ligament reconstruction. The lesion forms at the anterior cruciate ligament insertion creating a painful extension block between femoral intercondylar notch and tibial plateau. We present 2 cases (3 knees in which cyclops lesions appeared atypically following bicruciate-retaining total knee replacement. Two lesions occurred in a single patient following bilateral knee replacement. One lesion occurred in an active sportswoman. All 3 resolved following arthroscopic debridement. We describe the presentation of this unusual complication and suggest keys to its diagnosis, treatment, and prevention. Keywords: Cyclops lesion, Bicruciate-retaining, Total knee arthroplasty, Extension deficit

  10. Apixaban or enoxaparin for thromboprophylaxis after knee replacement

    DEFF Research Database (Denmark)

    Lassen, Michael Rud; Raskob, Gary E; Gallus, Alexander

    2009-01-01

    thromboprophylaxis with a low risk of bleeding and improved ease of use. METHODS: In a double-blind, double-dummy study, we randomly assigned patients undergoing total knee replacement to receive 2.5 mg of apixaban orally twice daily or 30 mg of enoxaparin subcutaneously every 12 hours. Both medications were started...... (P=0.03). CONCLUSIONS: As compared with enoxaparin for efficacy of thromboprophylaxis after knee replacement, apixaban did not meet the prespecified statistical criteria for noninferiority, but its use was associated with lower rates of clinically relevant bleeding and it had a similar adverse...

  11. Fast Flux Test Facility replacement of a primary sodium pump

    International Nuclear Information System (INIS)

    Krieg, S.A.; Thomson, J.D.

    1985-01-01

    The Fast Flux Test Facility is a 400 MW Thermal Sodium Cooled Fast Reactor operated by Westinghouse Hanford Company for the US Department of Energy. During startup testing in 1979, the sodium level in one of the primary sodium pumps was inadvertently raised above the normal height. This resulted in distortion of the pump shaft. Pump replacement was carried out using special maintenance equipment. Nuclear radiation and contamination were not significant problems since replacement operations were carried out shortly after startup of the Fast Flux Test Facility

  12. Synthetic ossicular replacements: Normal and abnormal CT appearance

    International Nuclear Information System (INIS)

    Swartz, J.D.; Zwillenberg, S.; Berger, A.S.; Granoff, D.W.; Popky, G.L.

    1986-01-01

    Numerous synthetic ossicular replacements are currently in use. The TORP conducts sound from the newly formed tympanic membrane to the oval window; the PORP is used when the stapes superstructure is maintained, being interposed between the tympanic membrane and the stapes capitulum. In 12 patients the surgical results of ossicular replacement procedures were good, which gave the author the opportunity to study the normal CT appearance. In an additional 10 patients CT was performed before surgical revision. Using CT, they have been able to diagnose subluxation and fibrous tissue fixation. In two patients the CT appearance was unremarkable, but at surgery lateralization of the graft was found, with a nonfunctioning interface

  13. Ethamsylate and blood loss in total hip replacement.

    Science.gov (United States)

    Keith, I

    1979-01-01

    Nineteen consecutive patients undergoing total hip replacement under epidural anaesthesia were randomly divided into two groups. The treatment group received 1000 mg of ethamsylate intravenously before induction of anaesthesia. Blood lost during surgery was measured by a colorimetric technique. Closed suction drains were used and all blood lost after operation collected for measurement. Ethamsylate did not decrease the average volumes of blood lost during or after the operation. Neither did it reduce the requirements for blood transfusion. Although there were no side-effects attributable to ethamyslate, there seems to be no indication for its use in total hip replacement under epidural anaesthesia.

  14. Who should have knee joint replacement surgery for osteoarthritis?

    DEFF Research Database (Denmark)

    Dieppe, Paul; Lim, Keith; Lohmander, Stefan

    2011-01-01

    Knee joint replacement is an effective and cost-effective intervention for severe symptomatic osteoarthritis of the knee joint. However, utilisation rates vary hugely, there are no indications, it is difficult to know when (in the course of arthritis) it is best to operate, and some 10-20% of peo......Knee joint replacement is an effective and cost-effective intervention for severe symptomatic osteoarthritis of the knee joint. However, utilisation rates vary hugely, there are no indications, it is difficult to know when (in the course of arthritis) it is best to operate, and some 10...

  15. Strength Characteristics of Quarry Dust in Replacement of Sand

    Science.gov (United States)

    Shyam Prakash, K.; Hanumantha Rao, Ch, Dr

    2017-08-01

    The replacement of natural fine aggregate by using quarry dust leads to consumption of generated quarry dust, the requirement of land fill area can be reduced and solves the natural sand scarcity problem. The sand availability as a fine aggregate at low cost which needs the reason to search as a alternative material. Even it causes saddle to dump the crusher dust at one place which causes environmental pollution. The chemical analysis, specific gravity, sieve analysis and compressive strength is identified for various percentage and grades of concrete by replacement of sand with quarry dust.

  16. Steam generator replacement at Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Kimura, S.; Dodo, Takashi; Negishi, Kazuo

    1995-01-01

    Eleven nuclear units are in operation at the Kansai Electric Power Co., Inc.. In seven of them, Mihama-1·2·3, Takahama-1·2, and Ohi-1·2, comparatively long duration for tube inspection and repair have been required during late annual outages. KEPCO decided to replace all steam generators in these 7 units with the latest model which was improved upon the past degradation experiences, as a result of comprehensive considerations including public confidence in nuclear power generation, maintenability, and economic efficiency. This report presents the design improvements in new steam generators, replacement techniques, and so on. (author)

  17. Mitral Valve Replacement with a Pulmonary Autograft in an Infant

    Directory of Open Access Journals (Sweden)

    Yong Ho Jeong

    2018-04-01

    Full Text Available A 76-day-old infant weighing 3.4 kg was referred for surgical intervention for severe mitral valve stenoinsufficiency caused by leaflet fibrosis and calcification. He had experienced a cerebral infarction in the left middle cerebral artery territory, which was deemed attributable to an embolism of a calcified particle from the dysmorphic mitral valve. Because mitral valve replacement using a prosthetic valve was not feasible in this small baby, mitral valve replacement with a pulmonary autograft was performed. After a brief period of extracorporeal membrane oxygenation (ECMO support, he was weaned from ECMO and was discharged home without further cardiovascular complications.

  18. Modulator reliability and bandwidth improvement: replacing tetrodes with MOSFETs

    International Nuclear Information System (INIS)

    Donaldson, A.R.

    1982-01-01

    Three types of power MOS field effect transistors were studied with the intent of replacing a parallel pair of vacuum tube tetrodes in a linear modulator. The tetrodes have the shortest lifetimes of any other tubes in the system. The FETs offer definite performance advantages when compared to bipolar transistors and definite cost advantages when compared to vacuum tubes. Replacement of the tetrodes does however require careful consideration of voltage, current and to a lesser extent bandwidth capability in order to enhance overall modulator reliability without compromising present performance

  19. Application of ionizing radiation in sterilization of Selasan milk replacer

    International Nuclear Information System (INIS)

    Olbrichova, D.; Zouharova, A.; Buriankova, E.

    1984-01-01

    The effect of eight ascending doses of radiation within the range of 3 to 30 kGy on isolated microflora was observed in the milk replacer Selasan with initial contamination 4.9x10 4 germs per 1 gram of preparation. Microorganisms which survived the said radiation dose were evaluated micro and macroscopically. The level of resistance of isolates was determined on the basis of parameters of inactivation curves Nsub(D)=N 0 .esup(-kD). The obtained data served as the basis for determining the minimum sterilization dose 25 kGy for the Selasan replacer. (author)

  20. Primary extra-cranial meningioma following total hip replacement

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, T.J.; Beggs, I. [Royal Infirmary, Department of Radiology, Edinburgh (United Kingdom); Patton, J.T.; Porter, D. [Royal Infirmary, Department of Orthopaedics, Edinburgh (United Kingdom); Salter, D.M.; Al-Nafussi, A. [Royal Infirmary, Department of Pathology, Edinburgh (United Kingdom)

    2009-01-15

    A 61-year-old man presented with pain at the left hip and decreased mobility 10 years after total hip replacement. Imaging demonstrated a large destructive expansile mass adjacent to the prosthesis. Histological analysis confirmed the presence of an extra-cranial meningioma. Primary tumours after total hip replacement are rare and include soft tissue sarcomas, bone sarcomas and lymphomas. To our knowledge, no previous cases of primary extracranial meningioma have been identified. The imaging features, histology, pathogenesis and differential diagnosis are discussed. (orig.)