WorldWideScience

Sample records for replacement requirements experience

  1. 49 CFR 541.6 - Requirements for replacement parts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Requirements for replacement parts. 541.6 Section....6 Requirements for replacement parts. (a) Each replacement part for a part specified in § 541.5(a) must have the registered trademark of the manufacturer of the replacement part, or some other unique...

  2. Use of seismic experience data for technical evaluation of commercial grade replacement items

    International Nuclear Information System (INIS)

    Cushing, R.W.; Campbell, R.D.

    1991-01-01

    This paper reports that the purchase of commercial grade replacement items which are dedicated for use in nuclear safety related systems requires a technical evaluation for those items which cannot be purchased as like-for-like replacements. One of the requirements for performing a technical evaluation is verification of seismic adequacy. Studying the performance and failure modes of equipment which has been subjected to strong motion earthquakes has provided the industry with the ability to predict the behavior characteristics of many types of commonly replaced components and parts. The use of Seismic Experience Data has developed into an efficient means of satisfying the seismic adequacy requirement

  3. Use of seismic experience data for replacement and new equipment

    International Nuclear Information System (INIS)

    Johnson, H.W.; Hardy, G.S.; Horstman, N.G.; Baughman, P.D.

    1990-01-01

    Over the past seven years the use of seismic experience data to address seismic concerns has received a great deal of attention, particularly regarding the NRC Unresolved Safety Issue (USI) A-46. The Seismic Qualification Utility Group (SQUG) was formed in January 1982 to develop a practical alternative to the rigorous seismic qualification of equipment for resolution of USI A-46. The alternative method chosen is seismic experience technology. The purpose of this paper is to explore two additional potential applications of seismic experience technology: Replacement parts and New equipment/design change process. The need for, and benefits of, these applications are summarized. The available technology and the methodologies proposed are described. The methodology descriptions include a summary of the requirements for the seismic evaluations, an outline of the method, and the documentation requirements. (orig./HP)

  4. Regulatory requirements for replacement of analog systems with digital upgrades

    International Nuclear Information System (INIS)

    Loeser, P.J.

    1993-01-01

    This paper reviews briefly the regulatory guidelines which must be met in order to replace analog systems in nuclear power plants with digital systems. There is a move to do such replacements for a number of reasons: analog systems are aging, and showing considerable drift; few vendors manufacture analog systems today; support and parts are hard to get; digital systems provide flexibility. There is a safety concern however about undesirable and unpredictable effects to digital safety equipment due to plant transients, accidents, post-accident condition, and EMI/RF environmental interferences. License holders must comply with the requirements of 10 C.F.R. 50.59, which deals with safety concerns with respect to any changes to operating plants which may have an impact on the safety of the plant. NRC staff is taking the position that all digital upgrades will require an evaluation under this regulation

  5. [EU-Cosmetics: timetables for the replacement of animal experiments].

    Science.gov (United States)

    Ruhdel, Irmela Wiltrud

    2005-01-01

    According to the 7(th) Amendment of the Cosmetics Directive the European Commission had to establish timetables for the phasing out of the various animal tests for the safety evaluation of ingredients used in cosmetics. However, the published timetables do not reflect the objectives of the 7(th) Amendment but contain longer deadlines for the ban on animal experiments of several endpoints. The European Commission also had to draw up a Directive for establishing an Annex IX that should list validated alternative methods which are not already listed in Annex V of the Dangerous Substances Directive. Although various alternative methods could have been listed in this Annex IX, the Commission published an empty table. From the point of view of the German Animal Welfare Federation amendments of the timetables and the Directive establishing Annex IX are urgently required. Additionally, the Commission has to provide optimal conditions for the replacement of alternative methods.

  6. Functions and Requirements and Specifications for Replacement of the Computer Automated Surveillance System (CASS)

    International Nuclear Information System (INIS)

    SCAIEF, C.C.

    1999-01-01

    This functions, requirements and specifications document defines the baseline requirements and criteria for the design, purchase, fabrication, construction, installation, and operation of the system to replace the Computer Automated Surveillance System (CASS) alarm monitoring

  7. 9 CFR 442.3 - Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Scale requirements for accurate... PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.3 Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection. (a) All scales used to determine the net weight of meat and...

  8. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    Dunn, J.T.; Kakaria, B.K.

    1982-09-01

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  9. replacement of the heart of the CMS experiment - the pixel #detector.

    CERN Multimedia

    AUTHOR|(CDS)2070299

    2017-01-01

    This week, one of the Large Hadron Collider’s experiments gets a “heart transplant”. --- Physicists and engineers are replacing the heart of the CMS experiment - the pixel #detector. This will improve CMS’s ability to make precise measurements on aspects of the Standard Model, including the properties of the #HiggsBoson. The #LHC and its experiments are currently preparing to wake up this spring, when the accelerator will begin to collide particles once more at close to the speed of light. --- Today at 12:15 CET, join us live on #Facebook and ask us anything: https://www.facebook.com/cern/

  10. CUSTOM TRIFLANGE ACETABULAR COMPONENTS IN REVISION HIP REPLACEMENT (EXPERIENCE REVIEW

    Directory of Open Access Journals (Sweden)

    A. A. Korytkin

    2017-01-01

    Full Text Available Extensive defects of acetabulum especially accompanied by pelvis discontinuity at the level of acetabulum pose a serious challenge in revision hip replacement and create additional complexity in fixing the acetabular component. One of the perspective options to solve the above issue is the use of custom triflange acetabular components (CTAC designed based on preoperative computer tomography given the specifics of bone defects of the patient. Purpose of the study — to evaluate the outcomes of CTAC use in revision hip replacement.Materials and methods. The authors analyzed treatment outcomes of 12 patients after revision hip replacement using additive techniques of computer simulation and 3D printing CTAC. Follow up period after the surgery averaged 7±3 months (from one to ten months. 7 out of 12 patients had acetabular defects of Paprosky 3B type, 4 patients had defects of Paprosky 3A and in one patient — of Paprosky 2C.Results. Two out of twelve patients had prosthesis dislocations that required revision hip surgery, one of those patients underwent open reduction of dislocation with wound debridement, another patient underwent replacement of articulating couple of acetabular component. Total scores under Harris Hip Score and paint VAS score prior to treatment was 28±7 and 7±1 points respectively, postoperative scores were 76±9 and 3±1 respectively.Conclusion. The application of additive techniques for revision hip replacement in patients with extensive acetabular and pelvic defects allows to make a precise preoperative planning, to restore joint rotation center, to reconstruct bone defects and to securely fix triflange acetabular component that altogether significantly improve treatment outcomes and patients satisfaction with the surgery.

  11. Design verification for reactor head replacement

    International Nuclear Information System (INIS)

    Dwivedy, K.K.; Whitt, M.S.; Lee, R.

    2005-01-01

    This paper outlines the challenges of design verification for reactor head replacement for PWR plants and the program for qualification from the prospective of the utility design engineering group. This paper is based on the experience with the design confirmation of four reactor head replacements for two plants, and their interfacing components, parts, appurtenances, and support structures. The reactor head replacement falls under the jurisdiction of the applicable edition of the ASME Section XI code, with particular reference to repair/replacement activities. Under any repair/replacement activities, demands may be encountered in the development of program and plan for replacement due to the vintage of the original design/construction Code and the design reports governing the component qualifications. Because of the obvious importance of the reactor vessel, these challenges take on an added significance. Additional complexities are introduced to the project, when the replacement components are fabricated by vendors different from the original vendor. Specific attention is needed with respect to compatibility with the original design and construction of the part and interfacing components. The program for reactor head replacement requires evaluation of welding procedures, applicable examination, test, and acceptance criteria for material, welds, and the components. Also, the design needs to take into consideration the life of the replacement components with respect to the extended period of operation of the plant after license renewal and other plant improvements. Thus, the verification of acceptability of reactor head replacement provides challenges for development and maintenance of a program and plan, design specification, design report, manufacturer's data report and material certification, and a report of reconciliation. The technical need may also be compounded by other challenges such as widely scattered global activities and organizational barriers, which

  12. Replacing reserve requirements

    OpenAIRE

    Edward J. Stevens

    1993-01-01

    An examination of the fading significance of the Federal Reserve System's reserve requirements and the recent flowering of required clearing balances, a rapidly growing feature of Reserve Bank operations.

  13. Aortic Root Replacement for Children With Loeys-Dietz Syndrome.

    Science.gov (United States)

    Patel, Nishant D; Alejo, Diane; Crawford, Todd; Hibino, Narutoshi; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2017-05-01

    Loeys-Dietz syndrome (LDS) is an aggressive aortopathy with a proclivity for aortic aneurysm rupture and dissection at smaller diameters than other connective tissue disorders. We reviewed our surgical experience of children with LDS to validate our guidelines for prophylactic aortic root replacement (ARR). We reviewed all children (younger than 18 years) with a diagnosis of LDS who underwent ARR at our institution. The primary endpoint was mortality, and secondary endpoints included complications and the need for further interventions. Thirty-four children with LDS underwent ARR. Mean age at operation was 10 years, and 15 (44%) were female. Mean preoperative root diameter was 4 cm. Three children (9%) had composite ARR with a mechanical prosthesis, and 31 (91%) underwent valve-sparing ARR. Concomitant procedures included arch replacement in 2 (6%), aortic valve repair in 1 (3%), and patent foramen ovale closure in 16 (47%). There was no operative mortality. Two children (6%) required late replacement of the ascending aorta, 5 (15%) required arch replacement, 1 (3%) required mitral valve replacement, and 2 (6%) had coronary button aneurysms/pseudoaneurysms requiring repair. Three children required redo valve-sparing ARR after a Florida sleeve procedure, and 2 had progressive aortic insufficiency requiring aortic valve replacement after a valve-sparing procedure. There were 2 late deaths (6%). These data confirm the aggressive aortopathy of LDS. Valve-sparing ARR should be performed when feasible to avoid the risks of prostheses. Serial imaging of the arterial tree is critical, given the rate of subsequent intervention. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  14. Experiences from the Architectural Migration of a Joint Replacement Surgery Information System

    Directory of Open Access Journals (Sweden)

    Samuli Niiranen

    2008-01-01

    Full Text Available The goal of this study is to present the experiences gathered from the migration of an existing and deployed joint replacement surgery information system from a classical 2-tier architecture to a 4-tier architecture. These include discussion on the motivation for the migration and on the technical benefits of the chosen technical migration path and an evaluation of user experiences. The results from the analysis of clinical end-user and administrator experiences show an increase in the perceived performance and maintainability of the system and a high level of acceptance for the new system version.

  15. Comparison of Warfarin Requirements in Post-cardiac Surgery Patients: Valve Replacement Versus Non-valve Replacement.

    Science.gov (United States)

    Olson, Logan M; Nei, Andrea M; Joyce, David L; Ou, Narith N; Dierkhising, Ross A; Nei, Scott D

    2018-01-11

    Anticoagulation with warfarin affects approximately 140,000 post-cardiac surgery patients every year, yet there remains limited published data in this patient population. Dosing remains highly variable due to intrinsic risk factors that plague cardiac surgery candidates and a lack of diverse literature that can be applied to those who have undergone a cardiac surgery alternative to heart valve replacement (HVR). In the present study, our aim was to compare the warfarin requirements between HVR and non-HVR patients. This was a single-center, retrospective study of post-cardiac surgery patients initiated on warfarin at Mayo Clinic Hospital, Rochester, from January 1st, 2013 to October 31st, 2016. The primary outcome was the maintenance warfarin dose at the earliest of discharge or warfarin day 10 between patients with HVR and non-HVR cardiac surgeries. A total of 683 patients were assessed during the study period: 408 in the HVR group and 275 in the non-HVR group. The mean warfarin maintenance doses in the HVR and non-HVR groups were 2.55 mg [standard deviation (SD) 1.52] and 2.43 mg (SD 1.21), respectively (adjusted p = 0.65). A multivariable analysis was performed to adjust for gender, age, body mass index and drug interactions. This was the largest study to evaluate warfarin dose requirements in post-cardiac surgery patients and is the first to compare warfarin requirements between HVR and non-HVR patients during the immediate post-operative period. Both groups had similar warfarin requirements, which supports expanding the initial warfarin dosing recommendations of the 9th edition Chest guideline to include non-HVR patients as well as HVR patients.

  16. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  17. Incidence of Renal Failure Requiring Hemodialysis Following Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Ladia, Vatsal; Panchal, Hemang B; O׳Neil, Terrence J; Sitwala, Puja; Bhatheja, Samit; Patel, Rakeshkumar; Ramu, Vijay; Mukherjee, Debabrata; Mahmud, Ehtisham; Paul, Timir K

    2016-09-01

    Studies have shown that iodinated radiocontrast use is associated with acute renal failure especially in the presence of chronic kidney disease and multiple factors modulate this risk. The purpose of this meta-analysis is to compare the incidence of renal failure requiring hemodialysis between transfemoral (TF) and transapical (TA) transcatheter aortic valve replacement using the Edwards valve. The PubMed database was searched from January 2000 through December 2014. A total of 10 studies (n = 2,459) comparing TF (n = 1,268) and TA (n = 1,191) TAVR procedures using the Edwards valve were included. Variables of interest were baseline logistic EuroSCORE, prevalence of diabetes mellitus, hypertension, peripheral arterial disease, chronic kidney disease and amount of contrast used. The primary endpoint was incidence of renal failure requiring hemodialysis. The odds ratio and 95% CI were computed and P renal failure requiring hemodialysis was higher with the Edwards valve. This suggests that the incidence of renal failure requiring hemodialysis after TAVR is associated with baseline comorbidities in the TA-TAVR group rather than the volume of contrast used. Copyright © 2016 Southern Society for Clinical Investigation. Published by Elsevier Inc. All rights reserved.

  18. replacement of the heart of the CMS experiment - the pixel #detector. Part2

    CERN Multimedia

    Brice, Maximilien

    2017-01-01

    This week, one of the Large Hadron Collider’s experiments gets a “heart transplant”. --- Physicists and engineers are replacing the heart of the CMS experiment - the pixel #detector. This will improve CMS’s ability to make precise measurements on aspects of the Standard Model, including the properties of the #HiggsBoson. The #LHC and its experiments are currently preparing to wake up this spring, when the accelerator will begin to collide particles once more at close to the speed of light. --- Today at 12:15 CET, join us live on #Facebook and ask us anything: https://www.facebook.com/cern/

  19. Some competition experiments with alang-alang (Imperata cylindrica (L.) Beauv.) in replacement series.

    Science.gov (United States)

    Eussen, J H H

    1979-01-01

    The interaction between alang-alang (Imperata cylindrica) and maize or sorghum was studied in competition experiments according to the replacement principle. Dry matter yield of alang-alang in these experiments appeared hardly affected by the presence of maize or sorghum, while this yield of the latter two was strongly reduced by the presence of alang-alang. The relative yield total (RYT) reached unity except in one experiment in which a value of 0.6 was obtained.The results suggest that the allelopathic activity of alang-alang will find expression in an RYT deviating from one only if alang-alang is not able to utilize all available space.

  20. Steam generator replacement from ALARA aspects

    International Nuclear Information System (INIS)

    Terry, I.; Breznik, B.

    2003-01-01

    This paper is going to consider radiological related parameters important for steam generator replacement (SGR) implementation. These parameters are identified as ALARA related parameters, owner-contractor relationship, planning, health physics with logistic services, and time required for the replacement. ALARA related parameters such as source or initial dose rate and plant system configuration define the initial conditions for the planning. There is room to optimise work planning. managerial procedures and also the staff during the implementation phase. The overview of these general considerations is based on the following background: using internationally available data and the experience of one of the vendors, i.e. Siemens-Framatome, and management experience of SG replacement which took place at Krsko NPP in the spring of 2000. Generally plant decisions on maintenance or repair procedures under radiation conditions take into account ALARA considerations. But in the main it is difficult to adjudge the results of an ALARA study, usually in the form of a collective dose estimate, because a comparison standard is missing. That is, very often the planned work is of a one-off nature so comparisons are not possible or the scopes are not the same. In such a case the collective doses for other types of work are looked at and a qualitative evaluation is made. In the case of steam generator replacement this is not the case. Over years of steam generator replacements world-wide a standard has been developed gradually. The first part of the following displays an overview of SGR and sets the Krsko SGR in perspective by applying dose analysis. The second part concentrates on the Krsko SGR itself and its ALARA aspects. (authors)

  1. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  2. Steam generator replacement at Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Kimura, S.; Dodo, Takashi; Negishi, Kazuo

    1995-01-01

    Eleven nuclear units are in operation at the Kansai Electric Power Co., Inc.. In seven of them, Mihama-1·2·3, Takahama-1·2, and Ohi-1·2, comparatively long duration for tube inspection and repair have been required during late annual outages. KEPCO decided to replace all steam generators in these 7 units with the latest model which was improved upon the past degradation experiences, as a result of comprehensive considerations including public confidence in nuclear power generation, maintenability, and economic efficiency. This report presents the design improvements in new steam generators, replacement techniques, and so on. (author)

  3. Understanding the requirements of self-expandable stents for heart valve replacement : radial force, hoop force and equilibrium

    NARCIS (Netherlands)

    Cabrera, M.S.; Oomens, C.W.J.; Baaijens, F.P.T.

    2017-01-01

    A proper interpretation of the forces developed during stent crimping and deployment is of paramount importance for a better understanding of the requirements for successful heart valve replacement. The present study combines experimental and computational methods to assess the performance of a

  4. Synthesis of Hollow Gold-Silver Alloyed Nanoparticles: A "Galvanic Replacement" Experiment for Chemistry and Engineering Students

    Science.gov (United States)

    Jenkins, Samir V.; Gohman, Taylor D.; Miller, Emily K.; Chen, Jingyi

    2015-01-01

    The rapid academic and industrial development of nanotechnology has led to its implementation in laboratory teaching for undergraduate-level chemistry and engineering students. This laboratory experiment introduces the galvanic replacement reaction for synthesis of hollow metal nanoparticles and investigates the optical properties of these…

  5. Ongoing experiments: diagnostics requirements

    International Nuclear Information System (INIS)

    Dickerman, C.E.

    1976-01-01

    The paper reviews the fuel motion diagnostics needs for ongoing LMFBR safety experiments over approximately the next five years, with the discussion centered on TREAT. Brief comments on the direction in which clad motion diagnostics requirements are expected to develop are also presented

  6. Heart valve replacement with the Sorin tilting-disc prosthesis. A 10-year experience.

    Science.gov (United States)

    Milano, A; Bortolotti, U; Mazzucco, A; Mossuto, E; Testolin, L; Thiene, G; Gallucci, V

    1992-02-01

    From 1978 to 1988, 697 patients with a mean age of 48 +/- 11 years (range 5 to 75 years) received a Sorin tilting-disc prosthesis; 358 had had aortic valve replacement, 247 mitral valve replacement, and 92 mitral and aortic valve replacement. Operative mortality rates were 7.8%, 11.3%, and 10.8%, respectively, in the three groups. Cumulative duration of follow-up is 1650 patient-years for aortic valve replacement (maximum follow-up 11.4 years), 963 patient-years for mitral valve replacement (maximum follow-up 9.9 years) and 328 patient-years for mitral and aortic valve replacement (maximum follow-up 9.4 years). Actuarial survival at 9 years is 72% +/- 4% after mitral valve replacement, 70% +/- 3% after aortic valve replacement, and 50% +/- 12% after mitral and aortic valve replacement, and actuarial freedom from valve-related deaths is 97% +/- 2% after mitral valve replacement, 92% +/- 2% after aortic valve replacement, and 62% +/- 15% after mitral and aortic valve replacement. Thromboembolic events occurred in 21 patients with aortic valve replacement (1.3% +/- 0.2%/pt-yr), in 12 with mitral valve replacement (1.2% +/- 0.3% pt-yr), and in seven with mitral and aortic valve replacement (2.1% +/- 0.8%), with one case of prosthetic thrombosis in each group; actuarial freedom from thromboembolism at 9 years is 92% +/- 3% after mitral valve replacement, 91% +/- 3% after aortic valve replacement, and 74% +/- 16% after mitral and aortic valve replacement. Anticoagulant-related hemorrhage was observed in 15 patients after aortic valve replacement (0.9% +/- 0.2%/pt-yr), in 9 after mitral valve replacement (0.9% +/- 0.3%/pt-yr), and in 6 with mitral and aortic valve replacement (0.9% +/- 0.5%/pt-yr); actuarial freedom from this complication at 9 years is 94% +/- 2% after aortic valve replacement, 91% +/- 4% after mitral valve replacement, and 68% +/- 16% after mitral and aortic valve replacement. Actuarial freedom from reoperation at 9 years is 97% +/- 2% after mitral and

  7. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  8. TOTAL JOINT REPLACEMENT OF THE LOWER EXTREMITY IN PATIENTS WITH JUVENILE IDIOPATHIC ARTHRITIS

    Directory of Open Access Journals (Sweden)

    Стюарт Б. Гудмэн

    2014-03-01

    Full Text Available Joint replacement of the lower extremity in Juvenile Idiopathic Arthritis (JIA is becoming more commonly performed worldwide. These young adults experience severe pain and disability from end-stage arthritis, and require joint replacement of the hip or knee to alleviate pain, and restore ambulation and function. These procedures are very challenging from the anesthesia and surgical point of view, due to small overall proportions, numerous bony and other deformities and soft tissue contractures. Joint replacement operations for JIA are best performed by experienced teams, where pre-operative and peri-operative care, and post-operative rehabilitation can be optimized in a collaborative, patient-centered environment.

  9. 30 CFR 800.30 - Replacement of bonds.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Replacement of bonds. 800.30 Section 800.30... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.30 Replacement... replacement performance bonds. Replacement of a performance bond pursuant to this section shall not constitute...

  10. 24 CFR 572.125 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ...) Homeownership Program Requirements-Implementation Grants § 572.125 Replacement reserves. (a) Purpose. A single replacement reserve may be established for the homeownership program only if HUD determines it is necessary to... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Replacement reserves. 572.125...

  11. Instrumentation requirements for the ESF thermomechanical experiments

    International Nuclear Information System (INIS)

    Pott, J.; Brechtel, C.E.

    1992-01-01

    In situ thermomechanical experiments are planned as part of the Yucca Mountain Site Characterization Project that require instruments to measure stress and displacement at temperatures that exceed the typical specifications of existing geotechnical instruments. A high degree of instrument reliability will also be required to satisfy the objectives of the experiments, therefore a study was undertaken to identify areas where improvement in instrument performance was required. A preliminary list of instruments required for the experiments was developed, based on existing test planning and analysis. Projected temperature requirements were compared to specifications of existing instruments to identify instrumentation development needs. Different instrument technologies, not currently employed in geotechnical instrumentation, were reviewed to identify potential improvements of existing designs for the high temperature environment. Technologies with strong potentials to improve instrument performance with relatively high reliability include graphite fiber composite materials, fiber optics, and video imagery

  12. An experience of renal replacement therapy in children

    International Nuclear Information System (INIS)

    Jamal, A.; Ramzan, A.

    2002-01-01

    Objective: To determine the prevalence of renal failure in children requiring renal replacement therapy (RRT), the types of RRT being performed, problems encountered during the procedure and the outcome of the RRT in pediatric age group. Design: It was a retrospective study on pediatric patients with renal failure undergoing RRT. Place and Duration of Study: The study was carried out at National Institute of Child Health (N. I. C. H) covering a period of four years. Subjects and Methods: The study included all pediatric patients of acute renal failure, chronic renal failure and end stage renal disease who underwent RRT at N. I. C. H. Results: 17% of the patients with renal disease came in renal failure. A total of 65. 04 % patients received RT. Out of these, 84.7% underwent peritoneal dialysis (PD) while 15.3 % required hemodialysis and 2 were successfully transplanted. High cost of the RRT was the most commonly encountered problem during the procedure. Peritonitis was the commonest complication faced during the peritoneal dialysis while hypotension and complications related to vascular access were commonest during hemodialysis. About 50% of the patients undergoing peritoneal dialysis were left with persistent renal impairment while hemodialysis revealed a mortality of 37%. The two transplanted patients were doing well. Conclusion: The study showed that renal failure was a fairly common problem in pediatric age group and the prospects of successful RRT in Pakistan were quite high with a little effort on the part of medical professionals along with some financial assistance from the affluent of the country. (author)

  13. The Salary Premium Required for Replacing Management Faculty: Evidence from a National Survey

    Science.gov (United States)

    Finch, J. Howard; Allen, Richard S.; Weeks, H. Shelton

    2010-01-01

    One of the most important aspects of growing and improving business education is replacing departed faculty members. As the baby-boom generation approaches retirement, the supply of available replacement faculty members is diminishing. The result is a competitive market for replacement faculty that features increasing starting salary levels. In…

  14. The use of port-a-caths in adult patients with Lysosomal Storage Disorders receiving Enzyme Replacement Therapy-one centre experience

    Directory of Open Access Journals (Sweden)

    Mairead McLoughlin

    2017-12-01

    Full Text Available Port-a-cath is a widely used device in patients with long-term venous access demand such as frequent or continuous administration of medications such as Enzyme Replacement Therapy (ERT, chemotherapy delivery, blood transfusions, blood products, and fluids. Patients with Lysosomal Storage Diseases (LSDs often require recurrent courses of ERT. We reviewed our experience of using port-a-caths in patients with LSDs with the focus on challenges and complications associated with these catheters. Among 245 adult patients who were treated with ERT, twenty patients (8.2% had a port-a-cath inserted due to poor venous access. Six patients were using their first port whereas five other patients had their port-a-caths replaced at least once. The remaining six patients had inactive port-a-caths. The majority of patients with active port-a-caths never missed more than one consecutive infusion, although one patient missed 2 consecutive infusions whilst on holiday. We identified significant gaps in patients' and their families' understanding of the management of port-a-caths and risks associated with them. It resulted in producing a leaflet and designing an educational program for our LSD patients.

  15. 24 CFR 891.745 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.745... and Individuals-Section 162 Assistance § 891.745 Replacement reserve. The general requirements for the replacement reserve are provided in § 891.605. For projects funded under §§ 891.655 through 891.790, the...

  16. The patient's experience of temporary paralysis from spinal anaesthesia, a part of total knee replacement

    DEFF Research Database (Denmark)

    Bager, Louise; Konradsen, Hanne; Dreyer, Pia Sander

    2015-01-01

    AIMS AND OBJECTIVES: The aim of this study was to describe the meaning of being temporary paralysed from spinal anaesthesia when undergoing total knee replacement. BACKGROUND: Total knee arthroplasty is a common procedure, and regional anaesthesia is used as a method for anaesthetising the patient...... of the experience of spinal anaesthesia, as a part of having a total knee replacement. METHODS: Twelve patients were interviewed in March 2014 after undergoing an elective total knee arthroplasty under spinal anaesthesia. The interviews were analysed with a Ricoeur-inspired interpretation method. RESULTS: Three...... TO CLINICAL PRACTICE: The results of this study contribute to insights and deeper knowledge that can enhance staff's ability to provide care for patients undergoing total knee arthroplasty in spinal anaesthesia. The results provide perspectives that argue for care in accordance to individual needs....

  17. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  18. Promise and deceit: pharmakos, drug replacement therapy, and the perils of experience.

    Science.gov (United States)

    Meyers, Todd

    2014-06-01

    The problem of lying as a feature of medication compliance has been well documented in anthropological and clinical literatures. Yet the role of the lie-its destabilizing effects on the continuity of drug treatment and therapy, as a technology of drug misuse, or as a way to understand the neuro-chemical processes of treatment (pharmacotherapy "tricking" or lying to the brain)-has been less considered, particularly in the context of opioid replacement therapy. The following paper is set against the backdrop of a three-year study of adolescents receiving a relatively new drug (buprenorphine) for the treatment of opiate dependency inside and outside of highly monitored treatment environments in the United States. Lies give order not only to the experience of addiction but also to the experience of therapy as well. In order to better understand this ordering of experience, the paper puts the widely discussed conceptual duality of the pharmakon (healing and poison) in conversation with a perilously overlooked subject in the critical study of pharmacotherapy, namely the pharmakos or the personification of sacrifice. The paper demonstrates how the patient-subject comes to represent therapeutic promise by allowing for the possibility of (and often performing) deceit.

  19. The role of the safety analysis organization in steam generators replacement and reactor vessel head replacement evaluations

    International Nuclear Information System (INIS)

    Choe, Whee G.; Boatwright, W.J.

    2004-01-01

    When a major component in a nuclear power plant is replaced, especially the steam generators, the plant operator is presented a rare opportunity to learn from operating experience and significantly improve the performance, reliability and robustness of the plant. In addition to the use of improved materials, improved design margins can be built into the component specification that can later be used to provide meaningful operating margins. A Safety Analysis organization that is well-integrated with other plant organizations and possesses a detailed knowledge of the plant design and licensing bases can effectively balance the wants and needs of each organization to optimize the benefits realized by the plant as a whole. Knowledge of the assumptions, limitations, and available margins, both analytical and operating, can be used to specify a replacement steam generator design that optimizes costs and operating improvements. The work scope required to support the new design can be controlled through carefully selected and evaluated restrictions in operations, development of alternate operating strategies, and imposition of appropriate limitations. The important point is that the effective Safety Analysis organization must possess both the breadth and depth of knowledge of the plant design and operations and proactively use this information to support the replacement steam generator project. (author)

  20. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  1. Clinical study on postoperative steroid hormon replacement for preclinical Cushing's syndrome

    International Nuclear Information System (INIS)

    Furuta, Nozomu; Koide, Haruhisa; Sasaki, Hiroshi; Miki, Jun; Kimura, Takahiro; Egawa, Shin

    2009-01-01

    Diagnostic criteria for preclinical Cushing's syndrome (PCS) were reported in 1996. However, requirement of postoperative steroid hormone replacement is still controversial issue. In this study, we observed recent surgical cases retrospectively and evaluate the use of postoperative steroid hormone replacement. Eighteen patients with PCS underwent surgery from 1997 to 2007 in Jikei University Hospital. Thirteen of them received postoperative steroid hormone replacement. We investigated preoperative hormone activity by 131 I-adosterol scintigraphy and suppression of adrenocorticotropic hormone (ACTH) and evaluated the requirement of postoperative steroid hormone replacement. Preoperative serum cortisol was normal range in all patients. Serum ACTH was suppressed in 10 of them (56%). In 131 I-adosterol scintigraphy, accumulation in ipsilateral side was observed in all patients. Accumulation in contralateral side was observed in 13 patients whose serum ACTH had tendency to be suppressed. Mean period of steroid hormone replacement was 19.8 weeks. Patients with lower preoperative ACTH tended to require longer period until withdrawal of steroid hormone replacement. In addition, patients received steroid hormone replacement with higher starting dose significantly required longer period. Three of them had complications during tapering of steroid hormone. Postoperative adrenal insufficiency is important issue as postoperative management of PCS patients whose function of contralateral adrenal or pituitary gland is suppressed. 131 I-adosterol scintigraphy and preoperative serum ACTH were important factors to evaluate the requirement of postoperative steroid hormone replacement. Especially, patients with low preoperative serum ACTH tended to require long duration of postoperative steroid hormone replacement. On the other hand, patients with accumulation of contralateral side in 131 I-adosterol scintigraphy and without suppression of serum ACTH may not require steroid hormone

  2. [Reduction of animal experiments in experimental drug testing].

    Science.gov (United States)

    Behrensdorf-Nicol, H; Krämer, B

    2014-10-01

    In order to ensure the quality of biomedical products, an experimental test for every single manufactured batch is required for many products. Especially in vaccine testing, animal experiments are traditionally used for this purpose. For example, efficacy is often determined via challenge experiments in laboratory animals. Safety tests of vaccine batches are also mostly performed using laboratory animals. However, many animal experiments have clear inherent disadvantages (low accuracy, questionable transferability to humans, unclear significance). Furthermore, for ethical reasons and animal welfare aspects animal experiments are also seen very critical by the public. Therefore, there is a strong trend towards replacing animal experiments with methods in which no animals are used ("replacement"). If a replacement is not possible, the required animal experiments should be improved in order to minimize the number of animals necessary ("reduction") and to reduce pain and suffering caused by the experiment to a minimum ("refinement"). This "3R concept" is meanwhile firmly established in legislature. In recent years many mandatory animal experiments have been replaced by alternative in vitro methods or improved according to the 3R principles; numerous alternative methods are currently under development. Nevertheless, the process from the development of a new method to its legal implementation takes a long time. Therefore, supplementary regulatory measures to facilitate validation and acceptance of new alternative methods could contribute to a faster and more consequent implementation of the 3R concept in the testing of biomedical products.

  3. Nursing procedures during continuous renal replacement therapies: a national survey.

    Science.gov (United States)

    Ricci, Zaccaria; Benelli, Sonia; Barbarigo, Fabio; Cocozza, Giulia; Pettinelli, Noemi; Di Luca, Emanuela; Mettifogo, Mariangela; Toniolo, Andrea; Ronco, Claudio

    2015-01-01

    The current role of nurses in the management of critically ill patients needing continuous renal replacement therapies is clearly fundamental. The care of these complex patients is typically shared by critical care and dialysis nurses: their precise duties may vary from country to country. To clarify this issue we conducted a national-level survey at a recent Italian course on nursing practices during continuous renal replacement therapies. A total of 119 questionnaires were analysed. The participants, who were equally divided between critical care and dialysis nurses, came from 44 different hospitals and 35 Italian cities. Overall, 23% of participants answered that "the dialysis staff" were responsible for continuous renal replacement therapies in the Intensive Care Unit, while 39% answered "the critical care nurse", and 38% "a shared organization". Interestingly, less than the half of participants claimed specific continuous renal replacement therapies training was provided to employees before handling an acute dialysis machine. Finally, about 60% of participants had experience of extra-corporeal membrane oxygenation machines used in conjunction with continuous renal replacement therapies. Workload coordination and management of critically ill patients undergoing continuous renal replacement therapies in Italy is not standardized. At present, the duties of critical care and dialysis nurses vary significantly across the country. They frequently overlap or leave gaps in the assistance received by patients. The role of nurses involved in the care of continuous renal replacement therapies patients in Italy currently requires better organization, possibly starting with intensive standardized training and educational programs.

  4. Outcome and prognostic factors of critically ill patients with acute renal failure requiring continuous renal replacement therapy

    Directory of Open Access Journals (Sweden)

    Aldawood Abdulaziz

    2010-01-01

    Full Text Available Continuous renal replacement therapy (CRRT has proved to be beneficial for the treatment of critically ill patients with acute renal failure (ARF. The aim of this study is to determine the outcome and identify the predictors of mortality of critically ill patients treated with CRRT for ARF in the intensive care unit (ICU. This prospective cohort study of critically ill patients with ARF requiring CRRT admitted to the ICU was carried out at a tertiary care hospital in Saudi Arabia from 2002 to 2008. A total of 644 of 7173 patients with ARF required CRRT were studied. About 9% of the ARF patients required CRRT and comprised mainly those with medical causes, carrying a mortality of 64%. Multivariate analysis found high serum creatinine as an independent factor for better outcome and requirement of mechanical ventilation (MV as an independent factor for worse outcome. In our cohort study, ARF requiring CRRT in the ICU was associated with a high mortality.

  5. Population dynamics of the species Plantago major L. and Poa annua L. in a replacement series experiment

    Directory of Open Access Journals (Sweden)

    Mijović A.

    2009-01-01

    Full Text Available Population dynamics of the species Plantago major L. and Poa annua L., typical representatives of ruderal vegetation, was analyzed in a replacement series experiment. The analyzed species were sown in an area with meadow vegetation, where the vegetation present had been previously removed by a total herbicide and additionally by hoeing. The objective of the experiment was to monitor growth dynamics and the effect of intra- and inter-specific interaction of the species Plantago major and Poa annua in conditions of different sowing densities and proportions. The effects of intra- and inter-specific interference and the density-dependent responses were assessed on the basis of several parameters (natality, mortality, age structure, and measures of ontogenetic changes. Based on the study results, it can be concluded that the responses of the species in the experiment were different, which is explained by different adaptive mechanisms, i.e., strategies, in the specific environmental conditions. An effect of the density dependent response was present in both species in the replacement series experiment. The response was amplified by water deficit caused by intensive evapora­tion of the bare soil. No effect of inter-specific interference was observed at the given densities of the study species on the sample plots. An effect of intra-specific interference of the species Plantago major and Poa annua was observed in the guise of a density-negative response of the rate of ontogenetic changes and fecundity.

  6. Are output measurements always necessary after CT tube replacement?

    Directory of Open Access Journals (Sweden)

    Paul J Stauduhar

    2014-03-01

    Full Text Available Purpose: TX regulations and the ACR require that CT radiation output be measured within 30 days of major service. The most common major service is tube replacement. We hypothesized that historical QC data could be used instead to determine if output measurements are necessary, reducing the need for costly output measurements.Methods: We reviewed 66 records of tube replacements to determine with what frequency output falls outside specifications. We also conducted an experiment to verify that clinically significant output changes could be identified by comparing image noise in historical QC data with the same data after tube replacement. We used 30 days of historical QC data to establish a baseline noise level and 95% confidence interval (CI for individual noise measurements. To simulate output changes, we acquired phantom images with our QC protocol while manually changing output (mA. We acquired 10 images using the baseline output and 10 images at each different “output”. We evaluated individual images and subsets of images at each “output” to determine if the system was within the manufacturer’s specifications.Results: None of the 66 tube replacements resulted in an output change that exceeded specifications. Analysis of 30 days of historic QC data for our experimental system indicated a mean noise of 5.4 HU with 95% CI of 5.1 ‒ 5.7 HU. When using the mean noise of 10 images acquired at each of the varying outputs, we were able to identify, with 100% accuracy, images acquired at outputs outside manufacturer’s specifications.Conclusion: The results of our review of historical tube replacement data indicated the likelihood of output falling outside manufacturer’s specifications is low. Considering this, it is likely that by using QC data from programs required by regulation and the ACR physicists can reliably verify radiation output stability remotely instead of making physical measurements.--------------------Cite this article

  7. Belle-II Experiment Network Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Asner, David [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Bell, Greg [ESnet; Carlson, Tim [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Cowley, David [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Dart, Eli [ESnet; Erwin, Brock [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Godang, Romulus [Univ. of South Alabama, Mobile, AL (United States); Hara, Takanori [High Energy Accelerator Research Organization (KEK), Tsukuba (Japan); Johnson, Jerry [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Johnson, Ron [Univ. of Washington, Seattle, WA (United States); Johnston, Bill [ESnet; Dam, Kerstin Kleese-van [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Kaneko, Toshiaki [High Energy Accelerator Research Organization (KEK), Tsukuba (Japan); Kubota, Yoshihiro [NII; Kuhr, Thomas [Karlsruhe Inst. of Technology (KIT) (Germany); McCoy, John [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Miyake, Hideki [High Energy Accelerator Research Organization (KEK), Tsukuba (Japan); Monga, Inder [ESnet; Nakamura, Motonori [NII; Piilonen, Leo [Virginia Polytechnic Inst. and State Univ. (Virginia Tech), Blacksburg, VA (United States); Pordes, Ruth [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Ray, Douglas [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Russell, Richard [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Schram, Malachi [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Schroeder, Jim [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Sevior, Martin [Univ. of Melbourne (Australia); Singh, Surya [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Suzuki, Soh [High Energy Accelerator Research Organization (KEK), Tsukuba (Japan); Sasaki, Takashi [High Energy Accelerator Research Organization (KEK), Tsukuba (Japan); Williams, Jim [Indiana Univ., Bloomington, IN (United States)

    2013-05-28

    The Belle experiment, part of a broad-based search for new physics, is a collaboration of ~400 physicists from 55 institutions across four continents. The Belle detector is located at the KEKB accelerator in Tsukuba, Japan. The Belle detector was operated at the asymmetric electron-positron collider KEKB from 1999-2010. The detector accumulated more than 1 ab-1 of integrated luminosity, corresponding to more than 2 PB of data near 10 GeV center-of-mass energy. Recently, KEK has initiated a $400 million accelerator upgrade to be called SuperKEKB, designed to produce instantaneous and integrated luminosity two orders of magnitude greater than KEKB. The new international collaboration at SuperKEKB is called Belle II. The first data from Belle II/SuperKEKB is expected in 2015. In October 2012, senior members of the Belle-II collaboration gathered at PNNL to discuss the computing and neworking requirements of the Belle-II experiment with ESnet staff and other computing and networking experts. The day-and-a-half-long workshop characterized the instruments and facilities used in the experiment, the process of science for Belle-II, and the computing and networking equipment and configuration requirements to realize the full scientific potential of the collaboration's work.

  8. Temelin NPP - IandC replacement

    International Nuclear Information System (INIS)

    Spalenka, I.

    1997-01-01

    The original instrumentation and control system of the Temelin nuclear power plant is being upgraded and replaced by a modern Westinghouse-supplied system which meets the requirements imposed on current nuclear power plant designs. The history and purpose of the IandC system replacement is given, and the design of the new system is described in some detail. (A.K.)

  9. 'Your whole life is lived through your teeth': biographical disruption and experiences of tooth loss and replacement.

    Science.gov (United States)

    Rousseau, Nikki; Steele, Jimmy; May, Carl; Exley, Catherine

    2014-03-01

    The experience and meaning of tooth loss and replacement has varied historically and culturally but has received relatively little attention from social scientists. Our study set out to understand these experiences in the context of the arrival of newer, dental implant treatments. Semi-structured qualitative interviews were carried out with 39 men and women who had experienced tooth loss and replacement. A thematic analysis was sensitised by previous sociological work on chronic illness, particularly Bury's notion of biographical disruption. We found that while for some individuals the loss of a tooth was relatively insignificant, for others it was devastating and disruptive. In seeking to understand this difference, the concept of biographical disruption was a helpful analytical tool. Our analysis identified two forms of disruption. The first related to the meanings of tooth loss (the neglected mouth) and denture wearing (a marker of old age). The second, embodied, disruption concerned the relationship between the self and mouth in those wearing dentures (the invaded, unreliable mouth) and could occur even where tooth loss and denture wearing had been biographically anticipated. © 2013 The Authors. Sociology of Health & Illness © 2013 Foundation for the Sociology of Health & Illness/John Wiley & Sons Ltd.

  10. Assessment of the Patient-Centered and Family-Centered Care Experience of Total Joint Replacement Patients Using a Shadowing Technique.

    Science.gov (United States)

    Marcus-Aiyeku, Ulanda; DeBari, Margaret; Salmond, Susan

    2015-01-01

    In 2030, when baby boomers reach 65 years of age and represent 18% of the population, it is anticipated that 67 million adults will have a diagnosis of arthritis increasing the demand for total hip and knee arthroplasty. With the growing emphasis on patient- and family-centered care, the aim of this project was to assess the patient experience of patients and families throughout the entire spectrum of the total joint replacement service line care at a university regional trauma hospital. A shadowing methodology as defined by the Institute for Health Improvement was utilized. Eight patient/family groups undergoing total joint replacements were shadowed. The mapped care experience included time, caregiver, activity, shadower observations, and impressions. Findings revealed inconsistencies in the delivery of patient- and family-centered care. Communication and interactions were predominantly provider-centric, with a focus on care routines versus the patient and family, and anticipation that care would be medically directed.

  11. Some general requirements for irradiation experiments

    Energy Technology Data Exchange (ETDEWEB)

    Myers, H P; Skjoeldebrand, R

    1960-05-15

    This paper is limited to the interests of the EAES-symposium, namely the use of reactors for materials research and testing, for convenience we exclude consideration of chemical effects and problems of coolant technology. Its purpose is to try to define the general requirements for irradiation experiments and the reactors housing them; to see what facilities for irradiation experiments are available within the European Atomic Energy Society countries and finally, to point out possible limitations of these facilities.

  12. Primary separator replacement for Bruce Unit 8 steam generators

    International Nuclear Information System (INIS)

    Roy, S.B.; Mewdell, C.G.; Schneider, W.G.

    2000-01-01

    During a scheduled maintenance outage of Bruce Unit 8 in 1998, it was discovered that the majority of the original primary steam separators were damaged in two steam generators. The Bruce B steam generators are equipped with GXP type primary cyclone separators of B and W supply. There were localized perforations in the upper part of the separators and large areas of generalized wall thinning. The degradation was indicative of a flow related erosion corrosion mechanism. Although the unit- restart was justified, it was obvious that corrective actions would be necessary because of the number of separators affected and the extent of the degradation. Repair was not considered to be a practical option and it was decided to replace the separators, as required, in Unit 8 steam generators during an advanced scheduled outage. GXP separators were selected for replacement to minimize the impact on steam generator operating characteristics and analysis. The material of construction was upgraded from the original carbon steel to stainless steel to maximize the assurance of full life. The replacement of the separators was a first of a kind operation not only for Ontario Power Generation and B and W but also for all CANDU plants. The paper describes the degradations observed and the assessments, the operating experience, manufacture and installation of the replacement separators. During routine inspection in 1998, many of the primary steam separators in two of steam generators at Bruce Nuclear Division B Unit 8 were observed to have through wall perforations. This paper describes assessment of this condition. It also discusses the manufacture and testing of replacement primary steam separators and the development and execution of the replacement separator installation program. (author)

  13. 16 CFR 501.3 - Replacement bags for vacuum cleaners.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Replacement bags for vacuum cleaners. 501.3... REQUIREMENTS AND PROHIBITIONS UNDER PART 500 § 501.3 Replacement bags for vacuum cleaners. Replacement bags for..., provided: (a) The quantity of contents is expressed in terms of numerical count of the bags; (b) A...

  14. Outcomes of Reoperative Valve Replacement in Patients with Prosthetic Valve Endocarditis: A 20-Year Experience

    Directory of Open Access Journals (Sweden)

    Young Woong Kim

    2018-02-01

    Full Text Available Background: Prosthetic valve endocarditis (PVE is a serious complication of cardiac valve replacement, and many p atients with P VE r equire r eoperation. The aim of t his study was to r eview our institutional 2 0 -year experience of surgical reoperative valve replacement in patients with PVE. Methods: A retrospective study was performed on 84 patients (mean age, 54.8±12.7 years; 51 males who were diagnosed with PVE and underwent reoperative valve replacement from January 1995 to December 2016. Results: PVE was found in 1 valve in 61 cases (72.6%, and in 2 or more valves in 23 cases (27.4%. The median follow-up duration was 47.3 months (range, 0 to 250 months. Postoperative complications occurred in 39 patients (46.4%. Reinfection occurred in 6 cases, all within 1 year. The freedom from reinfection rate at 5 years was 91.0%±3.5%. The overall survival rates at 5 and 10 years were 64.4%±5.8% and 54.3%±7.3%, respectively. In stepwise multivariable Cox proportional hazard models, older age (hazard ratio [HR], 1.48; 95% confidence interval [CI], 1.05 to 2.10; p=0.027 and cardiopulmonary bypass (CPB time (HR, 1.03; 95% CI, 1.00 to 1.0 1; p =0 . 0 33 e merged a s independent risk f actors f or d eath. Conclusion: Older age and a longer CPB time were associated with an increased risk of overall mortality in PVE patients.

  15. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  16. Structural considerations in steam generator replacement

    International Nuclear Information System (INIS)

    Bertheau, S.R.; Gazda, P.A.

    1991-01-01

    Corrosion of the tubes and tube-support structures inside pressurized water reactor (PWR) steam generators has led many utilities to consider a replacement of the generators. Such a project is a major undertaking for a utility and must be well planned to ensure an efficient and cost-effective effort. This paper discusses various structural aspects of replacement options, such as total or partial generator replacement, along with their associated pipe cuts; major structural aspects associated with removal paths through the equipment hatch or through an opening in the containment wall, along with the related removal processes; onsite movement and storage of the generators; and the advantages and disadvantages of the removal alternatives. This paper addresses the major structural considerations associated with a steam generator replacement project. Other important considerations (e.g., licensing, radiological concerns, electrical requirements, facilities for management and onsite administrative activities, storage and fabrication activities, and offsite transportation) are not discussed in this paper, but should be carefully considered when undertaking a replacement project

  17. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    2005-01-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  18. Maintenance service for major component of PWR plant. Replacement of pressurizer safe end weld

    International Nuclear Information System (INIS)

    Miyoshi, Yoshiyuki; Kobayashi, Yuki; Yamamoto, Kazuhide; Ueda, Takeshi; Suda, Naoki; Shintani, Takashi

    2017-01-01

    In October 2016, MHI completed the replacement of safe end weld of pressurizer (Pz) of Ringhals unit 3, which was the first maintenance work for main component of pressurized water reactor (PWR) plant in Europe. For higher reliability and longer lifetime of PWR plant, MHI has conducted many kinds of maintenance works of main components of PWR plants in Japan against stress corrosion cracking due to aging degradation. Technical process for replacement of Pz safe end weld were established by MHI. MHI has experienced the work for 21 PWR units in Japan. That of Ringhals unit 3 was planned and conducted based on the experiences. In this work, Alloy 600 used for welds of nozzles of Pz was replaced with Alloy 690. Alloy 690 is more corrosive-resistant than Alloy 600. Specially designed equipment and technical process were developed and established by MHI to replace safe end weld of Pz and applied for the Ringhals unit 3 as a first application in Europe. The application had been performed in success and achieved the planned replacement work duration and total radiation dose by using sophisticated machining and welding equipment designed to meet the requirements to be small, lightweight and remote-controlled and operating by well skilled MHI personnel experienced in maintenance activities for major components of PWR plant in Japan. The success shows that the experience, activities and technology developed in Japan for main components of PWR plant shall be applicable to contribute reliable operations of nuclear power plants in Europe and other countries. (author)

  19. Prioritization methodology for chemical replacement

    Science.gov (United States)

    Cruit, Wendy; Goldberg, Ben; Schutzenhofer, Scott

    1995-01-01

    Since United States of America federal legislation has required ozone depleting chemicals (class 1 & 2) to be banned from production, The National Aeronautics and Space Administration (NASA) and industry have been required to find other chemicals and methods to replace these target chemicals. This project was initiated as a development of a prioritization methodology suitable for assessing and ranking existing processes for replacement 'urgency.' The methodology was produced in the form of a workbook (NASA Technical Paper 3421). The final workbook contains two tools, one for evaluation and one for prioritization. The two tools are interconnected in that they were developed from one central theme - chemical replacement due to imposed laws and regulations. This workbook provides matrices, detailed explanations of how to use them, and a detailed methodology for prioritization of replacement technology. The main objective is to provide a GUIDELINE to help direct the research for replacement technology. The approach for prioritization called for a system which would result in a numerical rating for the chemicals and processes being assessed. A Quality Function Deployment (QFD) technique was used in order to determine numerical values which would correspond to the concerns raised and their respective importance to the process. This workbook defines the approach and the application of the QFD matrix. This technique: (1) provides a standard database for technology that can be easily reviewed, and (2) provides a standard format for information when requesting resources for further research for chemical replacement technology. Originally, this workbook was to be used for Class 1 and Class 2 chemicals, but it was specifically designed to be flexible enough to be used for any chemical used in a process (if the chemical and/or process needs to be replaced). The methodology consists of comparison matrices (and the smaller comparison components) which allow replacement technology

  20. Transfusion requirements and clinical outcome in intensive care patients receiving continuous renal replacement therapy: comparison of prostacyclin vs. heparin prefilter administration

    DEFF Research Database (Denmark)

    Windeløv, Nis Agerlin; Ostrowski, Sisse R; Perner, Anders

    2010-01-01

    Prostacyclin (PGI(2)) analogous are potent antithrombotics recommended as prefilter infusion during renal replacement therapy (RRT) when heparin is contraindicated. It is debated whether PGI(2) administration during RRT affects transfusion requirements and outcome. Retrospective cohort study of all......: before, during and after CRRT. For each time period, laboratory values were analysed as changes/day and blood transfusion requirements as absolute values. Organ failures during the ICU stay and 1 year all-cause mortality were registered. During CRRT the PGI(2) group had a higher incidence of disseminated...

  1. 49 CFR 24.204 - Availability of comparable replacement dwelling before displacement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Availability of comparable replacement dwelling... General Relocation Requirements § 24.204 Availability of comparable replacement dwelling before displacement. (a) General. No person to be displaced shall be required to move from his or her dwelling unless...

  2. Remote telerobotic replacement for master-slave manipulator

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Iverson, D.C.; LaValle, D.R.

    1997-01-01

    A remotely replaceable telerobotic manipulator (TRM) has been developed and deployed at the Defense Waste Processing Facility (DWPF) in support of its radioactive operation. The TRM replaces a Master-Slave Manipulator (MSM). The TRM is in use for both routine and recovery operations for the radioactive waste vitrification melter, the primary production device within the DWPF. The arm was designed for deployment and operation using an existing MSM penetration. This replacement of an existing MSM with a high power robotic device demonstrates the capability to perform similar replacement in other operating facilities. The MSM's were originally deployed in the DWPF to perform routine light capacity tasks. During the testing phase of the DWPF, prior to its radioactive startup in 5/96, the need to remove glass deposits that can form at the melter discharge during filling of glass containment canisters was identified. The combination of high radiation and contamination in the DWPF melter cell during radioactive operation eliminated personnel entry as a recovery option. Therefore remote cleaning methods had to be devised. The MSM's had neither the reach nor the strength required for this task. It became apparent that a robust manipulator arm would be required for recovery from these potential melter discharge pluggage events. The existing wall penetrations, used for the MSM's, could not be altered for seismic and radiological reasons. The new manipulator was required to be of considerable reach, due to existing physical layout, and strength, due to the glass removal requirement. Additionally, the device would have to compatible with high radiation and remote crane installation. The physical size of the manipulator and the weight of components must be consistent with the existing facilities. It was recognized early-on that a manipulator of sufficient strength to recover from a pluggage event would require robotic functions to constrain undesirable motions

  3. PMS49 – Empirical comparison of discrete choice experiment and best-worst scaling to estimate stakeholders' risk tolerance for hip replacement surgery

    NARCIS (Netherlands)

    van Dijk, J.D.; Groothuis-Oudshoorn, Karin; Marshall, D.; IJzerman, Maarten Joost

    2013-01-01

    Objectives Empirical comparison of two preference elicitation methods, discrete choice experiment (DCE) and profile case best-worst scaling (BWS), regarding the estimation of the risk tolerance for hip replacement surgery (total hip arthroplasty and total hip resurfacing arthroplasty). Methods An

  4. "Not a replacement": emotional experiences and practical consequences of Israeli second couplehood stepfamilies constructed in old age.

    Science.gov (United States)

    Koren, Chaya; Lipman-Schiby, Sharon

    2014-12-01

    The increase in life expectancy enhances phenomena such as second couplehood in old age following widowhood or divorce as an alternative way of coping with changes that occur with aging. Research on the phenomenon has focused mainly on individual and dyadic perspectives of the repartnered. The aim of this article was to explore repartnering from the stepfamily's perspective, which has scarcely been studied. Nineteen Israeli stepfamilies (38 multigenerational families) were recruited using criterion sampling, of men who repartnered at age 65+ and women at 60+, with children and grandchildren from a lifelong marriage that ended in widowhood or divorce. We audio-recorded and transcribed verbatim 107 semi-structured, qualitative interviews with older partners, their adult children, and grandchildren. Analysis was based on grounded theory and dyadic analysis principles adapted to families. It showed how repartnering in old age changed the family structure, constructing complex stepfamilies, which require further study. Emotional experiences refer to repartnering being a replacement for couplehood but not for parenthood/grandparenthood. Practical consequences refer to "knowing their place" within the stepfamily and included the following subthemes: showing affection; participating in memorials for the deceased spouse; sharing, listening, and assisting. Findings are discussed regarding life course and family life cycle perspectives. Copyright © 2014 Elsevier Inc. All rights reserved.

  5. Some economic aspects of steam generator replacements in nuclear power plants

    International Nuclear Information System (INIS)

    Lebegner, J.

    1995-01-01

    The steam generator replacements performed over last decade (about 25 replacements until now), indicate trends towards improved techniques, shorter schedules and reduced total exposure and total costs. The goal of this paper is to give a worldwide review of SG replacement experience with accent on the economic aspect of the SG replacement. The main information about carried out replacements will be presented: cost, schedules, exposures, SG supplier and type, date of replacement, etc. Furthermore, the paper will contain the list of planned steam generator replacements in Europe, Japan and US future replacement plans. Finally, some of NPPs will be described whose initial nominal power has been increased along with SG replacement. (author)

  6. MANAGEMENT OF FAILED MITRAL VALVE REPLACEMENT. THE DURBAN EXPERIENCE.

    Science.gov (United States)

    Kistan, D; Booysen, M; Alexander, G; Madiba, T E

    2017-06-01

    Mitral valve replacement is the procedure of choice in patients with severe mitral valve disease. However, these patients are surviving longer and are thus at an increased risk of prosthesis failure or valve-related complications. Study setting: Inkosi Albert Luthuli Central Hospital, a tertiary referral Hospital in Durban. Study population: All patients undergoing redo mechanical mitral valve replacement surgery between January 2005 and December 2014. Study design: Retrospective analysis of patients undergoing redo mitral valve replacement. Patients were identified from theatre record books, their files were electronically accessed and pertinent information extracted onto a data capture sheet. Information documented included demographics, duration to failure, INR, Albumin, HIV status, clinical findings and outcome. The data was stored on an Excel datasheet. Fifty-eight patients were documented (mean age 32 ± 15.81 years; M:F 1:3). Ten patients (17%) were HIV positive (median CD4 count 478). Mean duration between first surgery and redo was 8.8 years. Thirty-five patients (60%) had no co-morbidities. Presenting features at redo surgery were congestive cardiac failure (27), chest pain (11) and palpitations (17). Mean preoperative Ejection Fraction was 51.65 %. Twenty-nine patients (55%) had emergency redo surgery. Twenty-two patients (75%) had acute prosthetic valve thrombosis. Thirty-two patients had tricuspid regurgitation. Original pathology was documented in 23 patients (40%) as Rheumatic valve disease. Prosthetic valve thrombosis was documented in 31 patients (54%). The most commonly used valve was the On-X. Mean presenting INR was 1.96 + 1.2 and mean presenting serum albumin was 36.7 + 7.8 g/l. Forty-one patients (71%) were found to be compliant to Warfarin therapy prior to redo surgery. Mean ICU stay was 6 +9 days. Two patients died postoperatively. Mean followup was 32 + 26.6 months. Twelve patients (20.7%) developed postoperative complications. Patients

  7. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  8. Meal replacement reduces insulin requirement, HbA1c and weight long-term in type 2 diabetes patients with >100 U insulin per day.

    Science.gov (United States)

    Kempf, K; Schloot, N C; Gärtner, B; Keil, R; Schadewaldt, P; Martin, S

    2014-04-01

    Despite high insulin doses, good glycaemic control is often lacking in type 2 diabetes patients and new therapeutic options are needed. In a proof of principle study, an energy-restricted, protein-rich meal replacement (PRMR) was examined as a means of reducing insulin requirement, HbA1C and body weight. Obese type 2 diabetes patients (n = 22) with >100 U insulin per day replaced, in week 1, the three main meals with 50 g of PRMR (Almased-Vitalkost) each (= 4903 kJ day(-1) ). In weeks 2-4, breakfast and dinner were replaced, and, in weeks 5-12, only dinner was replaced. Clinical parameters were determined at baseline, and after 4, 8 and 12 weeks, as well as after 1.5 years of follow-up. The Wilcoxon signed-rank test was used for the intention-to-treat analysis and the Mann-Whitney U-test for subgroup analyses. The 12-week-programme was completed by 15 participants (68%). After 1 week, the mean insulin dose was reduced from 147 (75) U to 91 (55) U day(-1) (P = 0.0001), and to 65 (32) U (P fasting blood glucose, triglycerides and high-density lipoprotein cholesterol improved significantly. After 1.5 years, insulin requirement and weight remained significantly lower than baseline. Participants who continued PRMR further reduced their HbA1c, weight and insulin dose. Two patients were able to stop insulin therapy altogether. Energy-restricted PRMR was effective in reducing insulin requirement of type 2 diabetes patients with intensified insulin therapy accompanied by a reduction of HbA1c, weight and other cardiometabolic risk factors. With the continuous use of PRMR, glycaemic control might be improved in the long term. © 2013 The British Dietetic Association Ltd.

  9. Steam generator replacement: a story of continuous improvement

    International Nuclear Information System (INIS)

    Sills, M.S.; Wilkerson, R.

    2009-01-01

    This paper provides a review of the history of steam generator replacement in the US focusing on the last five years. From the early replacements in the 1980s, there have been major technology improvements resulting in dramatically shorter outages and reduced radiological exposure for workers. Even though the changes for the last five years have been less dramatic, the improvement trend continues. No two steam generator replacement (SGR) projects are the same and there are some major differences including; the access path for the components to containment (is a construction opening in containment required), type of containment, number of steam generators, one piece or two piece replacement, plant type (Westinghouse, CE or B and W) and plant layout. These differences along with other variables such as delays due to plant operations and other activities not related to the steam generator replacement make analysis of performance data difficult. However, trends in outage performance and owner expectations can be identified. How far this trend will go is also discussed. Along with the trend of improved performance, there is also a significant variation in performance. Some of the contributors to this variation are identified. This paper addresses what is required for a successful outage, meeting the increasing expectations and setting new records. The authors will discuss various factors that contribute to the success of a steam generator replacement. These factors include technical issues and, equally important, organizational interface and the role the customer plays. Recommendations are provided for planning a successful steam generator replacement outage. (author)

  10. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1990-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. The methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and is expected to continue operation for at least and additional 25 years. Aging evaluations are in progress to address additional replacements that may be needed during this period

  11. Replacement of core components in the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Durney, J.L.; Croucher, D.W.

    1989-01-01

    The core internals of the Advanced Test Reactor are subjected to very high neutron fluences resulting in significant aging. The most irradiated components have been replaced on several occasions as a result of the neutron damage. The surveillance program to monitor the aging developed the needed criteria to establish replacement schedules and maximize the use of the reactor. Methods to complete the replacements with minimum radiation exposures to workers have been developed using the experience gained from each replacement. The original design of the reactor core and associated components allows replacements to be completed without special equipment. The plant has operated for about 20 years and will continue operation for perhaps another 20 years. Aging evaluations are in program to address additional replacements that may be needed during this extended time period. 3 figs

  12. Adjacent level effects of bi level disc replacement, bi level fusion and disc replacement plus fusion in cervical spine--a finite element based study.

    Science.gov (United States)

    Faizan, Ahmad; Goel, Vijay K; Biyani, Ashok; Garfin, Steven R; Bono, Christopher M

    2012-03-01

    Studies delineating the adjacent level effect of single level disc replacement systems have been reported in literature. The aim of this study was to compare the adjacent level biomechanics of bi-level disc replacement, bi-level fusion and a construct having adjoining level disc replacement and fusion system. In total, biomechanics of four models- intact, bi level disc replacement, bi level fusion and fusion plus disc replacement at adjoining levels- was studied to gain insight into the effects of various instrumentation systems on cranial and caudal adjacent levels using finite element analysis (73.6N+varying moment). The bi-level fusion models are more than twice as stiff as compared to the intact model during flexion-extension, lateral bending and axial rotation. Bi-level disc replacement model required moments lower than intact model (1.5Nm). Fusion plus disc replacement model required moment 10-25% more than intact model, except in extension. Adjacent level motions, facet loads and endplate stresses increased substantially in the bi-level fusion model. On the other hand, adjacent level motions, facet loads and endplate stresses were similar to intact for the bi-level disc replacement model. For the fusion plus disc replacement model, adjacent level motions, facet loads and endplate stresses were closer to intact model rather than the bi-level fusion model, except in extension. Based on our finite element analysis, fusion plus disc replacement procedure has less severe biomechanical effects on adjacent levels when compared to bi-level fusion procedure. Bi-level disc replacement procedure did not have any adverse mechanical effects on adjacent levels. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1989-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab

  14. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    Durney, J.L.; Klingler, W.B.

    1990-01-01

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor

  15. Delay in onset of metabolic alkalosis during regional citrate anti-coagulation in continous renal replacement therapy with calcium-free replacement solution

    Directory of Open Access Journals (Sweden)

    See Kay

    2009-01-01

    Full Text Available Regional citrate anti-coagulation for continuous renal replacement therapy chelates calcium to produce the anti- coagulation effect. We hypothesise that a calcium-free replacement solution will require less citrate and produce fewer metabolic side effects. Fifty patients, in a Medical Intensive Care Unit of a tertiary teaching hospital (25 in each group, received continuous venovenous hemofiltration using either calcium-containing or calcium-free replacement solutions. Both groups had no significant differences in filter life, metabolic alkalosis, hypernatremia, hypocalcemia, and hypercalcemia. However, patients using calcium-containing solution developed metabolic alkalosis earlier, compared to patients using calcium-free solution (mean 24.6 hours,CI 0.8-48.4 vs. 37.2 hours, CI 9.4-65, P = 0.020. When calcium-containing replacement solution was used, more citrate was required (mean 280ml/h, CI 227.2-332.8 vs. 265ml/h, CI 203.4-326.6, P = 0.069, but less calcium was infused (mean 21.2 ml/h, CI 1.2-21.2 vs 51.6ml/h, CI 26.8-76.4, P ≤ 0.0001.

  16. Valve-sparing root replacement for freestanding pulmonary autograft aneurysm after the Ross procedure.

    Science.gov (United States)

    Ratschiller, Thomas; Eva, Sames-Dolzer; Schimetta, Wolfgang; Paulus, Patrick; Müller, Hannes; Zierer, Andreas; Mair, Rudolf

    2018-02-20

    Autograft dilatation is the main long-term complication following the Ross procedure using the freestanding root replacement technique. We reviewed our 25-year experience with the Ross procedure with a special emphasis on valve-sparing reoperations. From 1991 to 2016, 153 patients (29.6 ± 16.6 years; 29.4% pediatric) underwent a Ross operation at our institution with implantation of the autograft as freestanding root replacement. The follow-up is 98.7% complete with a mean of 12.2 ± 5.5 years. Mortality at 30-days was 2.0%. Echocardiography documented no or trivial aortic regurgitation in 99.3% of the patients at discharge. Survival probability at 20 years was 85.4%. No case of autograft endocarditis occurred. Autograft deterioration rate was 2.01% per patient-year, and freedom from autograft reoperation was 75.3% at 15 years. A reoperation for autograft aneurysm was required in 35 patients (22.9%) at a mean interval of 11.1 ± 4.6 years after the Ross procedure. A valve-sparing root replacement was performed in 77% of patients, including 10 David and 17 Yacoub procedures with no early mortality. Three patients required prosthetic valve replacement within 2 years after a Yacoub operation. At latest follow-up, 92% of all surviving patients still carry the pulmonary autograft valve. Freedom from autograft valve replacement was 92.1% at 15 years. Using the David or Yacoub techniques, the autograft valve can be preserved in the majority of patients with root aneurysms after the Ross procedure. Reoperations can be performed with no early mortality, a good functional midterm result, and an acceptable reintervention rate. Copyright © 2018 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  17. The use of adaptive equipment following total knee replacement

    OpenAIRE

    McNaught, Jamie; Paul, Lorna

    2015-01-01

    Introduction: This study evaluates the need for adaptive equipment following total knee replacement. There are no recent studies to guide occupational therapists in the optimum time adaptive equipment is required following total knee replacement.\\ud \\ud Method: A non-experimental, concurrent mixed methods approach was used. The study population was patients attending for total knee replacement at a large general hospital. Outcome measures were the Oxford Knee Score, the United Kingdom Functio...

  18. Rehabilitation after total joint replacement: a scoping study.

    Science.gov (United States)

    L Snell, Deborah; Hipango, Julia; Sinnott, K Anne; Dunn, Jennifer A; Rothwell, Alastair; Hsieh, C Jean; DeJong, Gerben; Hooper, Gary

    2018-07-01

    The evidence supporting rehabilitation after joint replacement, while vast, is of variable quality making it difficult for clinicians to apply the best evidence to their practice. We aimed to map key issues for rehabilitation following joint replacement, highlighting potential avenues for new research. We conducted a scoping study including research published between January 2013 and December 2016, evaluating effectiveness of rehabilitation following hip and knee total joint replacement. We reviewed this work in the context of outcomes described from previously published research. Thirty individual studies and seven systematic reviews were included, with most research examining the effectiveness of physiotherapy-based exercise rehabilitation after total knee replacement using randomized control trial methods. Rehabilitation after hip and knee replacement whether carried out at the clinic or monitored at home, appears beneficial but type, intensity and duration of interventions were not consistently associated with outcomes. The burden of comorbidities rather than specific rehabilitation approach may better predict rehabilitation outcome. Monitoring of recovery and therapeutic attention appear important but little is known about optimal levels and methods required to maximize outcomes. More work exploring the role of comorbidities and key components of therapeutic attention and the therapy relationship, using a wider range of study methods may help to advance the field. Implications for Rehabilitation Physiotherapy-based exercise rehabilitation after total hip replacement and total knee replacement, whether carried out at the clinic or monitored at home, appears beneficial. Type, intensity, and duration of interventions do not appear consistently associated with outcomes. Monitoring a patient's recovery appears to be an important component. The available research provides limited guidance regarding optimal levels of monitoring needed to achieve gains following hip

  19. Three steam generator replacement projects in 1995: Consortium Siemens Framatome is well prepared to contribute its experience to the SGR at the Krsko NPP

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S.A. joined their experience and efforts in the field of steam generators replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 2. Further projects will follow in 1996, i.e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  20. Guideline for the seismic technical evaluation of replacement items for nuclear power plants

    International Nuclear Information System (INIS)

    Harris, S.P.; Cushing, R.W.; Johnson, H.W.; Abeles, J.M.

    1993-02-01

    Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included

  1. Review of ASME nuclear codes and standards- subcommittee on repairs, replacements, and modifications

    International Nuclear Information System (INIS)

    Mawson, T.J.

    1990-01-01

    As requested by the ASME board on Nuclear Codes and Standards, the Pressure Vessel Research Committee initiated a project to review Sections III and XI of the ASME Boiler and Pressure Vessel Code for the purposes of improving, clarifying, providing transition, consistency, compatibility, and simplifying code requirements. The project was organized with six subcommittees to address various Code activities: design; tests and examinations; documentation; quality assurance; repair, replacement and modification; and general requirements. This paper discusses how the subcommittee on repair, replacement and modification was organized to review the repair, replacement and modification requirements of the ASME boiler and pressure vessel code, Section III and Section XI for Class 1, 2, and 3 and MC components and their supports, and other documents of the nuclear industry related to the repair, replacement and modification requirements of the ASME code

  2. First reported experience with intramuscular diaphragm pacing in replacing positive pressure mechanical ventilators in children.

    Science.gov (United States)

    Onders, Raymond P; Ponsky, Todd A; Elmo, MaryJo; Lidsky, Karen; Barksdale, Edward

    2011-01-01

    Diaphragm pacing (DP) has been shown to successfully replace mechanical ventilators for adult tetraplegic patients with chronic respiratory insufficiency. This is the first report of DP in ventilator-dependent children. This was a prospective interventional experience under institutional review board approval. Diaphragm pacing involves outpatient laparoscopic diaphragm motor point mapping to identify the site where stimulation causes maximum diaphragm contraction with implantation of 4 percutaneous intramuscular electrodes. Diaphragm conditioning ensues to wean the child from the ventilator. Six children were successfully implanted ranging from 5 to 17 years old with the smallest 15 kg in weight. Length of time on mechanical ventilation ranged from 11 days to 7.6 years with an average of 3.2 years. In all patients, DP provided tidal volumes above basal needs. Five of the patients underwent a home-based weaning program, whereas one patient who was implanted only 11 days post spinal cord injury never returned to the ventilator with DP use. Another patient was weaned from the ventilator full time but died of complications of his underlying brain stem tumor. The remaining patients weaned from the ventilator for over 14 hours a day and/or are actively conditioning their diaphragms. Diaphragm pacing successfully replaced mechanical ventilators, which improves quality of life. Copyright © 2011 Elsevier Inc. All rights reserved.

  3. 46 CFR 53.01-10 - Service restrictions and exceptions (replaces HG-101).

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Service restrictions and exceptions (replaces HG-101... ENGINEERING HEATING BOILERS General Requirements § 53.01-10 Service restrictions and exceptions (replaces HG... lieu of the requirements in HG-101 of section IV of the ASME Boiler and Pressure Vessel Code...

  4. REPLACEMENT IN RABBIT HERDS: A REVIEW

    Directory of Open Access Journals (Sweden)

    Ibrahim F.M. Marai

    2010-08-01

    Full Text Available Doe rabbit's replacement constitutes the annual renewal rate of new breeders that must be incorporated into the production stock. Criterion for culling non-productive animals differs significantly among fryer production colonies, foundation stocks and a colony with continuous enzootic disease or continuous malnourishment. In commercial rabbit production, good management improves the health and productivity of the entire herd, by reducing the all-time high replacement rates and improving economic viability. In the present article, a comprehensive review of numerous experiences in the rabbit production field of different countries, was presented. Basic recommendations for professional breeders were highlighted, covering critical issues such as the need for continuously upgrading the health status of the colony, the positive effect of   genetic selection and the nutritional conditioning and special treatment of young does being groomed as future replacements.

  5. The replacement of serum by hormones in cell culture media.

    Science.gov (United States)

    Sato, G; Hayashi, I

    1976-12-01

    The replacement of serum by hormones in cell culture media. (Reemplazo del suero por hormonas en el medio de cultivo de células). Arch. Biol. Med. Exper. 10: 120-121, 1976. The serum used in cell culture media can be replaced by a mixture of hormones and some accesory blood factors. The pituitary cell line GH3 can be grown in a medium in which serum is replaced by triiodothyronine, transferrin, parathormone, tyrotrophin releasing hormone and somatomedins. Hela and BHK cell strains can also be grown in serum free medium supplemented with hormones. Each cell type appears to have different hormonal requirements yet it may found that some hormones are required for most cell types.

  6. HTR-PM Safety requirement and Licensing experience

    International Nuclear Information System (INIS)

    Li Fu; Zhang Zuoyi; Dong Yujie; Wu Zongxin; Sun Yuliang

    2014-01-01

    HTR-PM is a 200MWe modular pebble bed high temperature reactor demonstration plant which is being built in Shidao Bay, Weihai, Shandong, China. The main design parameters of HTR-PM were fixed in 2006, the basic design was completed in 2008. The review of Preliminary Safety Analysis Report (PSAR) of HTR-PM was started in April 2008, completed in September 2009. In general, HTR- PM design complies with the current safety requirement for nuclear power plant in China, no special standards are developed for modular HTR. Anyway, Chinese Nuclear Safety Authority, together with the designers, developed some dedicated design criteria for key systems and components and published the guideline for the review of safety analysis report of HTR-PM, based on the experiences from licensing of HTR-10 and new development of nuclear safety. The probabilistic safety goal for HTR-PM was also defined by the safety authority. The review of HTR-PM PSAR lasted for one and a half years, with 3 dialogues meetings and 8 topics meetings, with more than 2000 worksheets and answer sheets. The heavily discussed topics during the PSAR review process included: the requirement for the sub-atmospheric ventilation system, the utilization of PSA in design process, the scope of beyond design basis accidents, the requirement for the qualification of TRISO coating particle fuel, and etc. Because of the characteristics of first of a kind for the demonstration plant, the safety authority emphasized the requirement for the experiment and validation, the PSAR was licensed with certain licensing conditions. The whole licensing process was under control, and was re-evaluated again after Fukushima accident to be shown that the design of HTR-PM complies with current safety requirement. This is a good example for how to license a new reactor. (author)

  7. Cadmium plating replacements

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, M.J.; Groshart, E.C.

    1995-03-01

    The Boeing Company has been searching for replacements to cadmium plate. Two alloy plating systems seem close to meeting the needs of a cadmium replacement. The two alloys, zinc-nickel and tin-zinc are from alloy plating baths; both baths are neutral pH. The alloys meet the requirements for salt fog corrosion resistance, and both alloys excel as a paint base. Currently, tests are being performed on standard fasteners to compare zinc-nickel and tin-zinc on threaded hardware where cadmium is heavily used. The Hydrogen embrittlement propensity of the zinc-nickel bath has been tested, and just beginning for the tin-zinc bath. Another area of interest is the electrical properties on aluminum for tin-zinc and will be discussed. The zinc-nickel alloy plating bath is in production in Boeing Commercial Airplane Group for non-critical low strength steels. The outlook is promising that these two coatings will help The Boeing Company significantly reduce its dependence on cadmium plating.

  8. Three Steam Generator Replacement Projects in 1995

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S. A. joined their experience and efforts in the field of steam generator replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 1. Further projects will follow in 1996, i. e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  9. Heart valve replacements with regenerative capacity

    NARCIS (Netherlands)

    Dijkman, P.E.; Fioretta, E.S.; Frese, L.; Pasqualini, F.S.; Hoerstrup, S.P.

    2016-01-01

    The incidence of severe valvular dysfunctions (e.g., stenosis and insufficiency) is increasing, leading to over 300,000 valves implanted worldwide yearly. Clinically used heart valve replacements lack the capacity to grow, inherently requiring repetitive and high-risk surgical interventions during

  10. THE REPLACEMENT-RENEWAL OF INDUSTRIAL EQUIPMENTS. THE MAPI FORMULAS

    Directory of Open Access Journals (Sweden)

    Meo Colombo Carlotta

    2010-07-01

    Full Text Available Since the production has been found to be an economical means for satisfying human wants, this process requires a complex industrial organization together with a large investment in equipments, plants and productive systems. These productive systems are employed to alter the physical environment and create consumer goods. As a result, they are consumed or become obsolete, inadequate, or otherwise candidates for replacement. When replacement is being considered, two assets must be evaluated: the present asset, the defender and its potential replacement, the challenger. Since the success of an industrial organization depends upon profit, replacement should generally occur if an economic advantage will result. Whatever the reason leading to the consideration of replacement, the analysis and decisions must be based upon estimates of what will occur in the future. In this paper we present the Mapi algorithm as a procedure for evaluating investments or for analyzing replacement opportunities.

  11. Optimum body size of Holstein replacement heifers.

    Science.gov (United States)

    Hoffman, P C

    1997-03-01

    Criteria that define optimum body size of replacement heifers are required by commercial dairy producers to evaluate replacement heifer management programs. Historically recommended body size criteria have been based on live BW measurements. Numerous research studies have observed a positive relationship between BW at first calving and first lactation milk yield, which has served as the impetus for using live BW to define body size of replacement heifers. Live BW is, however, not the only available measurement to define body size. Skeletal measurements such as wither height, length, and pelvic area have been demonstrated to be related to first lactation performance and (or) dystocia. Live BW measurements also do not define differences in body composition. Differences in body composition of replacement heifers at first calving are also related to key performance variables. An updated research data base is available for the modern Holstein genotype to incorporate measures of skeletal growth and body composition with BW when defining body size. These research projects also lend insight into the relative importance of measurements that define body size of replacement heifers. Incorporation of these measurements from current research into present BW recommendations should aid commercial dairy producers to better define replacement heifer growth and management practices. This article proposes enhancements in defining optimum body size and growth characteristics of Holstein replacement heifers.

  12. The future of rapid bridge deck replacement.

    Science.gov (United States)

    2015-06-01

    Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose : inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction : techniques often use precast member...

  13. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  14. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  15. Joint Replacement (Finger and Wrist Joints)

    Science.gov (United States)

    ... All Topics A-Z Videos Infographics Symptom Picker Anatomy Bones Joints Muscles Nerves Vessels Tendons About Hand Surgery What is a Hand Surgeon? What is a Hand Therapist? Media Find a Hand Surgeon Home Anatomy Joint Replacement Email to a friend * required fields ...

  16. Global and Local Page Replacement Algorithms on Virtual Memory Systems for Image Processing

    OpenAIRE

    WADA, Ben Tsutom

    1985-01-01

    Three virtual memory systems for image processing, different one another in frame allocation algorithms and page replacement algorithms, were examined experimentally upon their page-fault characteristics. The hypothesis, that global page replacement algorithms are susceptible to thrashing, held in the raster scan experiment, while it did not in another non raster-scan experiment. The results of the experiments may be useful also in making parallel image processors more efficient, while they a...

  17. Principles of human joint replacement design and clinical application

    CERN Document Server

    Buechel, Frederick F

    2015-01-01

    This book is written for the users and designers of joint replacements. In its second extended edition it conveys to the reader the knowledge accumulated by the authors during their forty year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter describes the design methodology now required for joint replacement in the USA and EU countries. The remaining chapters provide a history of joint replacement, an evaluation of earlier and current devices and sample case hist...

  18. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    International Nuclear Information System (INIS)

    Miller, M.H.

    1995-01-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT trademark Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS

  19. Engineering development of a digital replacement protection system at an operating US PWR nuclear power plant: Installation and operational experiences

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.H. [Duke Power Co., Seneca, SC (United States)

    1995-04-01

    The existing Reactor Protection Systems (RPSs) at most US PWRs are systems which reflect 25 to 30 year-old designs, components and manufacturing techniques. Technological improvements, especially in relation to modern digital systems, offer improvements in functionality, performance, and reliability, as well as reductions in maintenance and operational burden. The Nuclear power industry and the US nuclear regulators are poised to move forward with the issues that have slowed the transition to modern digital replacements for nuclear power plant safety systems. The electric utility industry is now more than ever being driven by cost versus benefit decisions. Properly designed, engineered, and installed digital systems can provide adequate cost-benefit and allow continued nuclear generated electricity. This paper describes various issues and areas related to an ongoing RPS replacement demonstration project which are pertinant for a typical US nuclear plant to consider cost-effective replacement of an aging analog RPS with a modern digital RPS. The following subject areas relative to the Oconee Nuclear Station ISAT{trademark} Demonstrator project are discussed: Operator Interface Development; Equipment Qualification; Validation and Verification of Software; Factory Testing; Field Changes and Verification Testing; Utility Operational, Engineering and Maintenance; Experiences with Demonstration System; and Ability to operate in parallel with the existing Analog RPS.

  20. Acute Renal Replacement Therapy in Children with Diarrhea-Associated Hemolytic Uremic Syndrome: A Single Center 16 Years of Experience

    Directory of Open Access Journals (Sweden)

    Silviu Grisaru

    2011-01-01

    Full Text Available Acute kidney injury (AKI is becoming more prevalent among hospitalized children, its etiologies are shifting, and new treatment modalities are evolving; however, diarrhea-associated hemolytic uremic syndrome (D+HUS remains the most common primary disease causing AKI in young children. Little has been published about acute renal replacement therapy (ARRT and its challenges in this population. We describe our single center's experience managing 134 pediatric patients with D+HUS out of whom 58 (43% required ARRT over the past 16 years. In our cohort, all but one patient were started on peritoneal dialysis (PD. Most patients, 47 (81%, received acute PD on a pediatric inpatient ward. The most common recorded complications in our cohort were peritoneal fluid leaks 13 (22%, peritonitis 11 (20%, and catheter malfunction 5 (9%. Nine patients (16% needed surgical revision of their PD catheters. There were no bleeding events related to PD despite a mean platelets count of 40.9 (±23.5 × 103/mm3 and rare use of platelets infusions. Despite its methodological limitations, this paper adds to the limited body of evidence supporting the use of acute PD as the primary ARRT modality in children with D+HUS.

  1. AAFE man-made noise experiment project. Volume 1: Introduction experiment definition and requirements

    Science.gov (United States)

    1974-01-01

    An experiment was conducted to measure and map the man-made radio frequency emanations which exist at earth orbital altitudes. The major objectives of the program are to develop a complete conceptual experiment and developmental hardware for the collection and processing of data required to produce meaningful statistics on man-made noise level variations as functions of time, frequency, and geographic location. A wide dispersion measurement receiver mounted in a spacecraft operating in a specialized orbit is used to obtain the data. A summary of the experiment designs goals and constraints is provided. The recommended orbit for the spacecraft is defined. The characteristics of the receiver and the antennas are analyzed.

  2. Age replacement models: A summary with new perspectives and methods

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Al-Khalifa, Khalifa N.; Magid Hamouda, Abdel; Nakagawa, Toshio

    2017-01-01

    Age replacement models are fundamental to maintenance theory. This paper summarizes our new perspectives and hods in age replacement models: First, we optimize the expected cost rate for a required availability level and vice versa. Second, an asymptotic model with simple calculation is proposed by using the cumulative hazard function skillfully. Third, we challenge the established theory such that preventive replacement should be non-random and only corrective replacement should be made for the unit with exponential failure. Fourth, three replacement policies with random working cycles are discussed, which are called overtime replacement, replacement first, and replacement last, respectively. Fifth, the policies of replacement first and last are formulated with general models. Sixth, age replacement is modified for the situation when the economical life cycle of the unit is a random variable with probability distribution. Finally, models of a parallel system with constant and random number of units are taken into considerations. The models of expected cost rates are obtained and optimal replacement times to minimize them are discussed analytically and computed numerically. Further studies and potential applications are also indicated at the end of discussions of the above models. - Highlights: • Optimization of cost rate for availability level is discussed and vice versa. • Asymptotic and random replacement models are discussed. • Overtime replacement, replacement first and replacement last are surveyed. • Replacement policy with random life cycle is given. • A parallel system with random number of units is modeled.

  3. Cardiac-surgery associated acute kidney injury requiring renal replacement therapy. A Spanish retrospective case-cohort study

    Directory of Open Access Journals (Sweden)

    Garcia-Fernandez Nuria

    2009-09-01

    Full Text Available Abstract Background Acute kidney injury is among the most serious complications after cardiac surgery and is associated with an impaired outcome. Multiple factors may concur in the development of this disease. Moreover, severe renal failure requiring renal replacement therapy (RRT presents a high mortality rate. Consequently, we studied a Spanish cohort of patients to assess the risk factors for RRT in cardiac surgery-associated acute kidney injury (CSA-AKI. Methods A retrospective case-cohort study in 24 Spanish hospitals. All cases of RRT after cardiac surgery in 2007 were matched in a crude ratio of 1:4 consecutive patients based on age, sex, treated in the same year, at the same hospital and by the same group of surgeons. Results We analyzed the data from 864 patients enrolled in 2007. In multivariate analysis, severe acute kidney injury requiring postoperative RRT was significantly associated with the following variables: lower glomerular filtration rates, less basal haemoglobin, lower left ventricular ejection fraction, diabetes, prior diuretic treatment, urgent surgery, longer aortic cross clamp times, intraoperative administration of aprotinin, and increased number of packed red blood cells (PRBC transfused. When we conducted a propensity analysis using best-matched of 137 available pairs of patients, prior diuretic treatment, longer aortic cross clamp times and number of PRBC transfused were significantly associated with CSA-AKI. Patients requiring RRT needed longer hospital stays, and suffered higher mortality rates. Conclusion Cardiac-surgery associated acute kidney injury requiring RRT is associated with worse outcomes. For this reason, modifiable risk factors should be optimised and higher risk patients for acute kidney injury should be identified before undertaking cardiac surgery.

  4. Two-fold sustainability – Adobe with sawdust as partial sand replacement

    Science.gov (United States)

    Jokhio, Gul A.; Syed Mohsin, Sharifah M.; Gul, Yasmeen

    2018-04-01

    Adobe is a material that is economic, environment friendly, and provides better indoor air quality. The material required for the preparation of adobe include clay, sand, and sometimes straw or other organic materials. These materials do not require industrial processing or transportation, however, sand mining has been recently posing a threat to the environment. Therefore, to enhance the existing sustainability of adobe, sand can be partially or fully replaced by other waste materials. This approach will not only solve the problem of excessive sand mining, it will also address the issue of waste management. Sawdust is one such waste material that can be used to partially replace sand in Adobe. This paper presents the results of compressive and flexural test carried out on Adobe samples with partial sand replacement by sawdust. The results show that about 4% sand replacement by volume produces higher compressive strength, whereas the flexural strength reduces with the use of sawdust. However, since flexural strength is not a critical property for adobe, it is concluded that replacing sand with sawdust by about 4% of volume will be beneficial.

  5. Hip joint replacement

    Science.gov (United States)

    Hip arthroplasty; Total hip replacement; Hip hemiarthroplasty; Arthritis - hip replacement; Osteoarthritis - hip replacement ... Your hip joint is made up of 2 major parts. One or both parts may be replaced during surgery: ...

  6. 40 CFR 141.80 - General requirements.

    Science.gov (United States)

    2010-07-01

    ... service line replacement, and public education. These requirements are triggered, in some cases, by lead... requirements. (1) All water systems shall install and operate optimal corrosion control treatment as defined in... specified by the State under § 141.83. (f) Lead service line replacement requirements. Any system exceeding...

  7. Environmentally Optimal, Nutritionally Aware Beef Replacement Plant-Based Diets.

    Science.gov (United States)

    Eshel, Gidon; Shepon, Alon; Noor, Elad; Milo, Ron

    2016-08-02

    Livestock farming incurs large and varied environmental burdens, dominated by beef. Replacing beef with resource efficient alternatives is thus potentially beneficial, but may conflict with nutritional considerations. Here we show that protein-equivalent plant based alternatives to the beef portion of the mean American diet are readily devisible, and offer mostly improved nutritional profile considering the full lipid profile, key vitamins, minerals, and micronutrients. We then show that replacement diets require on average only 10% of land, 4% of greenhouse gas (GHG) emissions, and 6% of reactive nitrogen (Nr) compared to what the replaced beef diet requires. Applied to 320 million Americans, the beef-to-plant shift can save 91 million cropland acres (and 770 million rangeland acres), 278 million metric ton CO2e, and 3.7 million metric ton Nr annually. These nationwide savings are 27%, 4%, and 32% of the respective national environmental burdens.

  8. The iDuo Bi-compartmental Knee Replacement: Our Early Experience.

    Directory of Open Access Journals (Sweden)

    Peter Jemmett

    2016-12-01

    Our early results suggest that the iDuo knee is a good option for those with isolated bi-compartmental disease and outcome scores are comparable with those reported for the BKA. This bi-compartmental design may bridge the gap between the uni-compartmental and total knee replacement. The choice between monolithic or modular designs remains in debate. We will continue to use this prosthesis for a carefully selected group of patients.

  9. [Update in continuous renal replacement techniques].

    Science.gov (United States)

    Romero-García, M; de la Cueva-Ariza, L; Delgado-Hito, P

    2013-01-01

    Acute renal failure affects 25% of patients hospitalized in intensive care units. Despite technological advances, the mortality of these patients is still high due to its associated complications. Continuous renal replacement techniques are one of the treatments for acute renal failure because they make it possible to treat the complications and decrease mortality. The nurse's knowledge and skills regarding these techniques will be decisive for the success of the therapy. Consequently, the nurse's experience and training are key components. The objective of this article is to update the knowledge on continuous renal replacement techniques. Keeping this in mind, a review has been made of the physical and chemical principles such as diffusion and convection, among others. A description of the different continuous renal replacement techniques, a presentation of the main vascular access, and a description of the nursing cares and complications related to techniques used have also been provided. Copyright © 2012 Elsevier España, S.L. y SEEIUC. All rights reserved.

  10. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    Iizuka, N.

    2000-01-01

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  11. Resident Evaluation of a Required Telepsychiatry Clinical Experience.

    Science.gov (United States)

    Teshima, John; Hodgins, Michael; Boydell, Katherine M; Pignatiello, Antonio

    2016-04-01

    The authors explored resident experiences of telepsychiatry clinical training. This paper describes an analysis of evaluation forms completed by psychiatry residents following a required training experience in telepsychiatry. Retrospective numeric and narrative data were collected from 2005 to 2012. Using a five-point Likert-type scale (1 = strongly disagree and 5 = strongly agree), residents ranked the session based on the following characteristics: the overall experience, interest in participating in telepsychiatry in the future, understanding service provision to underserved areas, telepsychiatry as mode of service delivery, and the unique aspects of telepsychiatry work. The authors also conducted a content analysis of narrative comments in response to open-ended questions about the positive and negative aspects of the training experience. In all, 88% of residents completed (n = 335) an anonymous evaluation following their participation in telepsychiatry consultation sessions. Numeric results were mostly positive and indicated that the experience was interesting and enjoyable, enhanced interest in participating in telepsychiatry in the future, and increased understanding of providing psychiatric services to underserved communities. Narrative data demonstrated that the most valuable aspects of training included the knowledge acquired in terms of establishing rapport and engaging with patients, using the technology, working collaboratively, identifying different approaches used, and awareness of the complexity of cases. Resident desire for more training of this nature was prevalent, specifically a wish for more detail, additional time for discussion and debriefing, and further explanation of the unique aspects of telepsychiatry as mode of delivery. More evaluation of telepsychiatry training, elective or required, is needed. The context of this training offered potential side benefits of learning about interprofessional and collaborative care for the

  12. High Risk Aortic Valve Replacement - The Challenges of Multiple Treatment Strategies with an Evolving Technology.

    Science.gov (United States)

    Booth, K; Beattie, R; McBride, M; Manoharan, G; Spence, M; Jones, J M

    2016-01-01

    Deciding on the optimal treatment strategy for high risk aortic valve replacement is challenging. Transcatheter Aortic Valve implantation (TAVI) has been available in our centre as an alternative treatment modality for patients since 2008. We present our early experience of TAVI and SAVR (surgical Aortic Valve Replacement) in high risk patients who required SAVR because TAVI could not be performed. The database for Surgical aortic valve and Transcatheter aortic valve replacement referrals was interrogated to identify relevant patients. Survival to hospital discharge was 95.5% in the forty five patients who had SAVR when TAVI was deemed technically unsuitable. One year survival was 86%. Defining who is appropriate for TAVI or high risk SAVR is challenging and multidisciplinary team discussion has never been more prudent in this field of evolving technology with ever decreasing risks of surgery. The introduction of TAVI at our institution has seen a rise in our surgical caseload by approximately by 25%. Overall, the option of aortic valve intervention is being offered to more patients in general which is a substantial benefit in the treatment of aortic valve disease.

  13. Essential Specification Elements for Heat Exchanger Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Bower, L.

    2015-07-01

    Performance upgrade and equipment degradation are the primary impetuses for a nuclear power plant to engage in the large capital cost project of heat exchanger replacement. Along with attention to these issues, consideration of heat exchanger Codes and Standards, material improvements, thermal redesign, and configuration are essential for developing User’s Design Specifications for successful replacement projects. The User’s Design Specification is the central document in procuring ASME heat exchangers. Properly stated objectives for the heat exchanger replacement are essential for obtaining the materials, configurations and thermal designs best suited for the nuclear power plant. Additionally, the code of construction required and the applied manufacturing standard (TEMA or HEI) affects how the heat exchanger may be designed or configured to meet the replacement goals. Knowledge of how Codes and Standards affect design and configuration details will aid in writing the User’s Design Specification. Joseph Oat Corporation has designed and fabricated many replacement heat exchangers for the nuclear power industry. These heat exchangers have been constructed per ASME Section III to various Code-Years or ASME Section VIII-1 to the current Code-Year also in accordance with TEMA and HEI. These heat exchangers have been a range of like-for-like replacement to complete thermal, material and configuration redesigns. Several examples of these heat exchangers with their Code, Standard and specification implications are presented. (Author.

  14. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    Harris, K.J.

    1999-01-01

    HIFAR, a 10 MW tank type DIDO Class reactor has operated at the Lucas Heights Science and Technology Centre for 43 years. HIFAR and the 10 kW Argonaut reactor 'Moata' which is in the Care and Maintenance phase of decommissioning are Australia's only nuclear reactors. The initial purpose for HIFAR was for materials testing to support a nuclear power program. Changing community attitude through the 1970's and a Government decision not to proceed with a planned nuclear power reactor resulted in a reduction of materials testing activities and a greater emphasis being placed on neutron beam research and the production of radioisotopes, particularly for medical purposes. HIFAR is not fully capable of satisfying the expected increase in demand for medical radiopharmaceuticals beyond the next 5 years and the radial configuration of the beam tubes severely restricts the scope and efficiency of neutron beam research. In 1997 the Australian Government decided that a replacement research reactor should be built by the Australian Nuclear Science and Technology Organisation at Lucas Heights subject to favourable results of an Environmental Impact Study. The Ei identified no reasons on the grounds of safety, health, hazard or risk to prevent construction on the preferred site and it was decided in May 1999 that there were no environmental reasons why construction of the facility should not proceed. In recent years ANSTO has been reviewing the operation of HIFAR and observing international developments in reactor technology. Limitations in the flexibility and efficiency achievable in operation of a tank type reactor and the higher intrinsic safety sought in fundamental design resulted in an early decision that the replacement reactor must be a pool type having cleaner and higher intensity tangential neutron beams of wider energy range than those available from HIFAR. ANSTO has chosen to use it's own resources supported by specialised external knowledge and experience to identify

  15. Replacement Condition Detection of Railway Point Machines Using an Electric Current Sensor.

    Science.gov (United States)

    Sa, Jaewon; Choi, Younchang; Chung, Yongwha; Kim, Hee-Young; Park, Daihee; Yoon, Sukhan

    2017-01-29

    Detecting replacement conditions of railway point machines is important to simultaneously satisfy the budget-limit and train-safety requirements. In this study, we consider classification of the subtle differences in the aging effect-using electric current shape analysis-for the purpose of replacement condition detection of railway point machines. After analyzing the shapes of after-replacement data and then labeling the shapes of each before-replacement data, we can derive the criteria that can handle the subtle differences between "does-not-need-to-be-replaced" and "needs-to-be-replaced" shapes. On the basis of the experimental results with in-field replacement data, we confirmed that the proposed method could detect the replacement conditions with acceptable accuracy, as well as provide visual interpretability of the criteria used for the time-series classification.

  16. Technical requirement of experiments and facilities for fusion nuclear technology

    International Nuclear Information System (INIS)

    Abdou, M.; Tillak, M.; Gierszwski, P.; Grover, J.; Puigh, R.; Sze, D.K.; Berwald, D.

    1986-06-01

    The technical issues and requirements of experiments and facilities for fusion nuclear technology (FNT) have been investigated. The nuclear subsystems addressed are: a) blanket, b) radiation shield, c) tritium processing system, and d) plasma interactive components. Emphasis has been placed on the important and complex development problems of the blanket. A technical planning process for FNT has been developed and applied, including four major elements: 1) characterization of issues, 2) quantification of testing requirements, 3) evaluation of facilities, and 4) development of a test plan to identify the role, timing, characteristics and costs of major experiments and facilities

  17. 42 CFR 482.80 - Condition of participation: Data submission, clinical experience, and outcome requirements for...

    Science.gov (United States)

    2010-10-01

    ..., clinical experience, and outcome requirements for initial approval of transplant centers. 482.80 Section... Hospitals Transplant Center Data Submission, Clinical Experience, and Outcome Requirements § 482.80 Condition of participation: Data submission, clinical experience, and outcome requirements for initial...

  18. An MHD Dynamo Experiment.

    Science.gov (United States)

    O'Connell, R.; Forest, C. B.; Plard, F.; Kendrick, R.; Lovell, T.; Thomas, M.; Bonazza, R.; Jensen, T.; Politzer, P.; Gerritsen, W.; McDowell, M.

    1997-11-01

    A MHD experiment is being constructed which will have the possibility of showing dynamo action: the self--generation of currents from fluid motion. The design allows sufficient experimental flexibility and diagnostic access to study a variety of issues central to dynamo theory, including mean--field electrodynamics and saturation (backreaction physics). Initially, helical flows required for dynamo action will be driven by propellers embedded in liquid sodium. The flow fields will first be measured using laser doppler velocimetry in a water experiment with an identical fluid Reynolds number. The magnetic field evolution will then be predicted using a MHD code, replacing the water with sodium; if growing magnetic fields are found, the experiment will be repeated with sodium.

  19. New energy replacement method for resonant power supplies

    International Nuclear Information System (INIS)

    Karady, G.G.; Thiessen, H.A.

    1989-01-01

    The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab

  20. of surfactant replacement therapy at Johannesburg Hospital ...

    African Journals Online (AJOL)

    To assess the impact of surfactant replacement therapy (SRl) on the outcome of ... oxygen requirements) was compared with that of a historical control group of ... The use of SRT added to the total cost of treating a patient ventilated for HMD.

  1. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; Arthroplasty - shoulder - discharge

  2. Risks and benefits of citrate anticoagulation for continuous renal replacement therapy.

    Science.gov (United States)

    Shum, H P; Yan, W W; Chan, T M

    2015-04-01

    Heparin, despite its significant side-effects, is the most commonly used anticoagulant for continuous renal replacement therapy in critical care setting. In recent years, citrate has gained much popularity by improving continuous renal replacement therapy circuit survival and decreasing blood transfusion requirements. However, its complex metabolic consequences warrant modification in the design of the citrate-based continuous renal replacement therapy protocol. With thorough understanding of the therapeutic mechanism of citrate, a simple and practicable protocol can be devised. Citrate-based continuous renal replacement therapy can be safely and widely used in the clinical setting with appropriate clinical staff training.

  3. Improving the thermodynamic efficiency of steam turbine condensers with partial tube replacement and an advanced tube bundle design

    International Nuclear Information System (INIS)

    Drosdziok, A.; Zorner, W.

    1989-01-01

    Many different problems have been experienced with power plant condensers all over the world. It has become apparent that plant availability and cost-effectiveness are significantly influenced by the thermodynamic design of the condensers and the materials selected. This paper reports that by refitting older condensers in operating plants it has proven possible to improve thermodynamic efficiency by changing the tube bundle design. In conjunction with the replacement of the cooper-bearing tubing in these condensers, which became necessary because of the introduction of high AVT (All Volatile Treatment) conditioning in the secondary circuit, it has generally been possible to fulfil the requirements imposed on the condensers without a deterioration of plant efficiency. By experience, best results have been obtained by replacing the condenser bundle with an advanced tube bundle design. Apart from solving all problems, this further improves the thermodynamic efficiency of the condensers. In nuclear power plants constructed by the Siemens KWU Group the condensers are tailored to present-day requirements

  4. Experience with Designing and Implementing a Bundled Payment Program for Total Hip Replacement.

    Science.gov (United States)

    Whitcomb, Winthrop F; Lagu, Tara; Krushell, Robert J; Lehman, Andrew P; Greenbaum, Jordan; McGirr, Joan; Pekow, Penelope S; Calcasola, Stephanie; Benjamin, Evan; Mayforth, Janice; Lindenauer, Peter K

    2015-09-01

    Bundled payments, also known as episode-based payments, are intended to contain health care costs and promote quality. In 2011 a bundled payment pilot program for total hip replacement was implemented by an integrated health care delivery system in conjunction with a commercial health plan subsidiary. In July 2015 the Centers for Medicare & Medicaid Services (CMS) proposed the Comprehensive Care for Joint Replacement Model to test bundled payment for hip and knee replacement. Stakeholders were identified and a structure for program development and implementation was created. An Oversight Committee provided governance over a Clinical Model Subgroup and a Financial Model Subgroup. The pilot program included (1) a clinical model of care encompassing the period from the preoperative evaluation through the third postoperative visit, (2) a pricing model, (3) a program to share savings, and (4) a patient engagement and expectation strategy. Compared to 32 historical controls-patients treated before bundle implementation-45 post-bundle-implementation patients with total hip replacement had a similar length of hospital stay (3.0 versus 3.4 days, p=.24), higher rates of discharge to home or home with services than to a rehabilitation facility (87% versus 63%), similar adjusted median total payments ($22,272 versus $22,567, p=.43), and lower median posthospital payments ($704 versus $1,121, p=.002), and were more likely to receive guideline-consistent care (99% versus 95%, p=.05). The bundled payment pilot program was associated with similar total costs, decreased posthospital costs, fewer discharges to rehabilitation facilities, and improved quality. Successful implementation of the program hinged on buy-in from stakeholders and close collaboration between stakeholders and the clinical and financial teams.

  5. Fiber-reinforced Composite for Chairside Replacement of Anterior ...

    African Journals Online (AJOL)

    Fiber-reinforced Composite for Chairside Replacement of Anterior Teeth: A Case Report. ... investigation will be required to provide additional information on the survival of directly-bonded anterior fixed prosthesis made with FRC systems.

  6. [Valve-sparing Replacement in Patients with Aortic Root Dilatation].

    Science.gov (United States)

    Yamazaki, Kazuhiro; Minatoya, Kenji; Ueda, Ryoma; Takehara, Masato; Sakamoto, Kazuhisa; Ide, Yujiro; Kanemitsu, Hideo; Ueyama, Koji; Ikeda, Tadashi

    2018-01-01

    Valve-sparing root replacement is increasingly used to overcome drawbacks associated with valvular prostheses. In our institution, 7 patients underwent valve-sparing root replacement from August 2016 to July 2017. The mean age was 45 years (range, 14~69 years). Three patients had Marfan syndrome and 1 had Loeys-Dietz syndrome with acute aortic dissection. All patients underwent surgery with reimplantation technique using a Valsalva graft. Two patients required repair of aortic valve leaflet prolapse. All patients had an excellent clinical course, with mild or no aortic regurgitation and a decrease in end-diastolic volume on echocardiography. These results support the continued use of valve-sparing root replacement in selected patients.

  7. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Leak testing and replacement of sealed sources. 34.27... SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement... radiographic exposure device and leak testing of any sealed source must be performed by persons authorized to...

  8. Pulmonary Valve Replacement : Twenty-Six Years of Experience With Mechanical Valvar Prostheses

    NARCIS (Netherlands)

    Freling, Hendrik G.; van Slooten, Ymkje J.; van Melle, Joost P.; Ebels, Tjark; Hoendermis, Elke S.; Berger, Rolf M. F.; Hillege, Hans L.; Waterbolk, Tjalling W.; van Veldhuisen, Dirk J.; Willems, Tineke P.; Pieper, Petronella G.

    BACKGROUND: Although the thromboembolic risk after pulmonary valve replacement (PVR) with mechanical valves is presumed to be high, recent studies suggest promising short-term and mid-term results. However, large studies reporting long-term mortality and valve-related complications are missing.

  9. Optimal replacement of residential air conditioning equipment to minimize energy, greenhouse gas emissions, and consumer cost in the US

    International Nuclear Information System (INIS)

    De Kleine, Robert D.; Keoleian, Gregory A.; Kelly, Jarod C.

    2011-01-01

    A life cycle optimization of the replacement of residential central air conditioners (CACs) was conducted in order to identify replacement schedules that minimized three separate objectives: life cycle energy consumption, greenhouse gas (GHG) emissions, and consumer cost. The analysis was conducted for the time period of 1985-2025 for Ann Arbor, MI and San Antonio, TX. Using annual sales-weighted efficiencies of residential CAC equipment, the tradeoff between potential operational savings and the burdens of producing new, more efficient equipment was evaluated. The optimal replacement schedule for each objective was identified for each location and service scenario. In general, minimizing energy consumption required frequent replacement (4-12 replacements), minimizing GHG required fewer replacements (2-5 replacements), and minimizing cost required the fewest replacements (1-3 replacements) over the time horizon. Scenario analysis of different federal efficiency standards, regional standards, and Energy Star purchases were conducted to quantify each policy's impact. For example, a 16 SEER regional standard in Texas was shown to either reduce primary energy consumption 13%, GHGs emissions by 11%, or cost by 6-7% when performing optimal replacement of CACs from 2005 or before. The results also indicate that proper servicing should be a higher priority than optimal replacement to minimize environmental burdens. - Highlights: → Optimal replacement schedules for residential central air conditioners were found. → Minimizing energy required more frequent replacement than minimizing consumer cost. → Significant variation in optimal replacement was observed for Michigan and Texas. → Rebates for altering replacement patterns are not cost effective for GHG abatement. → Maintenance levels were significant in determining the energy and GHG impacts.

  10. High gain requirements and high field Tokamak experiments

    International Nuclear Information System (INIS)

    Cohn, D.R.

    1994-01-01

    Operation at sufficiently high gain (ratio of fusion power to external heating power) is a fundamental requirement for tokamak power reactors. For typical reactor concepts, the gain is greater than 25. Self-heating from alpha particles in deuterium-tritium plasmas can greatly reduce ητ/temperature requirements for high gain. A range of high gain operating conditions is possible with different values of alpha-particle efficiency (fraction of alpha-particle power that actually heats the plasma) and with different ratios of self heating to external heating. At one extreme, there is ignited operation, where all of the required plasma heating is provided by alpha particles and the alpha-particle efficiency is 100%. At the other extreme, there is the case of no heating contribution from alpha particles. ητ/temperature requirements for high gain are determined as a function of alpha-particle heating efficiency. Possibilities for high gain experiments in deuterium-tritium, deuterium, and hydrogen plasmas are discussed

  11. Nonparametric adaptive age replacement with a one-cycle criterion

    International Nuclear Information System (INIS)

    Coolen-Schrijner, P.; Coolen, F.P.A.

    2007-01-01

    Age replacement of technical units has received much attention in the reliability literature over the last four decades. Mostly, the failure time distribution for the units is assumed to be known, and minimal costs per unit of time is used as optimality criterion, where renewal reward theory simplifies the mathematics involved but requires the assumption that the same process and replacement strategy continues over a very large ('infinite') period of time. Recently, there has been increasing attention to adaptive strategies for age replacement, taking into account the information from the process. Although renewal reward theory can still be used to provide an intuitively and mathematically attractive optimality criterion, it is more logical to use minimal costs per unit of time over a single cycle as optimality criterion for adaptive age replacement. In this paper, we first show that in the classical age replacement setting, with known failure time distribution with increasing hazard rate, the one-cycle criterion leads to earlier replacement than the renewal reward criterion. Thereafter, we present adaptive age replacement with a one-cycle criterion within the nonparametric predictive inferential framework. We study the performance of this approach via simulations, which are also used for comparisons with the use of the renewal reward criterion within the same statistical framework

  12. Replacement of outboard main steam isolation valves in a boiling water reactor plant

    Energy Technology Data Exchange (ETDEWEB)

    Schlereth, J.R.; Pennington, D.

    1996-12-01

    Most Boiling Water Reactor plants utilize wye pattern globe valves for main steam isolation valves for both inboard and outboard isolation. These valves have required a high degree of maintenance attention in order to pass the plant local leakage rate testing (LLRT) requirements at each outage. Northern States Power made a decision in 1993 to replace the outboard valves at it`s Monticello plant with double disc gate valves. The replacement of the outboard valves was completed during the fall outage in 1994. During the spring outage in April of 1996 the first LLRT testing was performed with excellent results. This presentation will address the decision process, time requirements and planning necessary to accomplish the task as well as the performance results and cost effectiveness of replacing these components.

  13. Replacement of outboard main steam isolation valves in a boiling water reactor plant

    International Nuclear Information System (INIS)

    Schlereth, J.R.; Pennington, D.

    1996-01-01

    Most Boiling Water Reactor plants utilize wye pattern globe valves for main steam isolation valves for both inboard and outboard isolation. These valves have required a high degree of maintenance attention in order to pass the plant local leakage rate testing (LLRT) requirements at each outage. Northern States Power made a decision in 1993 to replace the outboard valves at it's Monticello plant with double disc gate valves. The replacement of the outboard valves was completed during the fall outage in 1994. During the spring outage in April of 1996 the first LLRT testing was performed with excellent results. This presentation will address the decision process, time requirements and planning necessary to accomplish the task as well as the performance results and cost effectiveness of replacing these components

  14. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... Ankle replacement surgery is most often done while you are under general anesthesia. This means you will ...

  15. Hardware replacements and software tools for digital control computers

    International Nuclear Information System (INIS)

    Walker, R.A.P.; Wang, B-C.; Fung, J.

    1996-01-01

    Technological obsolescence is an on-going challenge for all computer use. By design, and to some extent good fortune, AECL has had a good track record with respect to the march of obsolescence in CANDU digital control computer technology. Recognizing obsolescence as a fact of life, AECL has undertaken a program of supporting the digital control technology of existing CANDU plants. Other AECL groups are developing complete replacement systems for the digital control computers, and more advanced systems for the digital control computers of the future CANDU reactors. This paper presents the results of the efforts of AECL's DCC service support group to replace obsolete digital control computer and related components and to provide friendlier software technology related to the maintenance and use of digital control computers in CANDU. These efforts are expected to extend the current lifespan of existing digital control computers through their mandated life. This group applied two simple rules; the product, whether new or replacement should have a generic basis, and the products should be applicable to both existing CANDU plants and to 'repeat' plant designs built using current design guidelines. While some exceptions do apply, the rules have been met. The generic requirement dictates that the product should not be dependent on any brand technology, and should back-fit to and interface with any such technology which remains in the control design. The application requirement dictates that the product should have universal use and be user friendly to the greatest extent possible. Furthermore, both requirements were designed to anticipate user involvement, modifications and alternate user defined applications. The replacements for hardware components such as paper tape reader/punch, moving arm disk, contact scanner and Ramtek are discussed. The development of these hardware replacements coincide with the development of a gateway system for selected CANDU digital control

  16. Health status, renal function, and quality of life after multiorgan failure and acute kidney injury requiring renal replacement therapy

    Directory of Open Access Journals (Sweden)

    Faulhaber-Walter R

    2016-05-01

    Full Text Available Robert Faulhaber-Walter,1,2 Sebastian Scholz,1,3 Herrmann Haller,1 Jan T Kielstein,1,* Carsten Hafer1,4,* 1Department of Renal and Hypertensive Disease, Medical School Hannover, Hannover, Germany; 2Facharztzentrum Aarberg, Waldshut-Tiengen, Germany; 3Sanitaetsversorgungszentrum Wunstorf, Wunstorf, Germany; 4HELIOS Klinikum Erfurt, Erfurt, Germany *These authors contributed equally to this work Background: Critically ill patients with acute kidney injury (AKI in need of renal replacement therapy (RRT may have a protracted and often incomplete rehabilitation. Their long-term outcome has rarely been investigated. Study design: Survivors of the HANnover Dialysis OUTcome (HANDOUT study were evaluated after 5 years for survival, health status, renal function, and quality of life (QoL. The HANDOUT study had examinded mortality and renal recovery of patients with AKI receiving either standard extendend or intensified dialysis after multi organ failure. Results: One hundred fifty-six former HANDOUT participants were analyzed. In-hospital mortality was 56.4%. Five-year survival after AKI/RRT was 40.1% (86.5% if discharged from hospital. Main causes of death were cardiovascular complications and sepsis. A total of 19 survivors presented to the outpatient department of our clinic and had good renal recovery (mean estimated glomerular filtration rate 72.5±30 mL/min/1.73 m2; mean proteinuria 89±84 mg/d. One person required maintenance dialysis. Seventy-nine percent of the patients had a pathological kidney sonomorphology. The Charlson comorbidity score was 2.2±1.4 and adjusted for age 3.3±2.1 years. Numbers of comorbid conditions averaged 2.38±1.72 per patient (heart failure [52%] > chronic kidney disease/myocardial infarction [each 29%]. Median 36-item short form health survey (SF-36™ index was 0.657 (0.69 physical health/0.66 mental health. Quality-adjusted life-years after 5 years were 3.365. Conclusion: Mortality after severe AKI is higher than

  17. Replacing textbook problems with lab experiences

    Science.gov (United States)

    Register, Trevor

    2017-10-01

    End-of-the-chapter textbook problems are often the bread and butter of any traditional physics classroom. However, research strongly suggests that students be given the opportunity to apply their knowledge in multiple contexts as well as be provided with opportunities to do the process of science through laboratory experiences. Little correlation has been shown linking the number of textbook problems solved with conceptual understanding of topics in mechanics. Furthermore, textbook problems as the primary source of practice for students robs them of the joy and productive struggle of learning how to think like an experimental physicist. Methods such as Modeling Instruction tackle this problem head-on by starting each instructional unit with an inquiry-based lab aimed at establishing the important concepts and equations for the unit, and this article will discuss ideas and experiences for how to carry that philosophy throughout a unit.

  18. Nicotine replacement therapy

    Science.gov (United States)

    Smoking cessation - nicotine replacement; Tobacco - nicotine replacement therapy ... Before you start using a nicotine replacement product, here are some things to know: The more cigarettes you smoke, the higher the dose you may need to ...

  19. Meal Replacement Mass Reduction and Integration Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Barrett, A.; Richardson, M.; Arias, D.; Schneiderman, J.; Slack, K.; Williams, T.; Douglas, G.

    2017-01-01

    NASA, in planning for long-duration missions, has an imperative to provide a food system with the necessary nutrition, acceptability, and safety to ensure sustainment of crew health and performance. The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore the team is challenged to reduce the mass of the food system by 10% while maintaining product safety, nutrition, and acceptability. Commercially available products do not meet the nutritional requirements for a full meal replacement in the spaceflight food system, and it is currently unknown if daily meal replacements will impact crew food intake and psychosocial health over time. The purpose of this study was to develop a variety of nutritionally balanced breakfast replacement bars that meet spaceflight nutritional, microbiological, sensorial, and shelf-life requirements, while enabling a 10% savings in food mass. To date, six nutrient-dense meal replacement bars (approximately 700 calories per bar) have been developed, using traditional methods of compression as well as novel ultrasonic compression technologies developed by Creative Resonance Inc. (Phoenix, AZ). The four highest rated bars were evaluated in the Human Exploration Research Analog (HERA) to assess the frequency with which actual meal replacement options may be implemented. Specifically, overall impact of bars on mood, satiety, digestive discomfort, and satisfaction with food. These factors are currently being analyzed to inform successful implementation strategies where crew maintain adequate food intake. In addition, these bars are currently undergoing shelf-life testing to determine long-term sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. water activity and texture), and microbiological compliance over two years of storage at room temperature and potential temperature abuse conditions to predict long-term acceptability. It is expected that

  20. Hip Replacement Surgery

    Science.gov (United States)

    ... Outreach Initiative Breadcrumb Home Health Topics English Español Hip Replacement Surgery Basics In-Depth Download Download EPUB ... PDF What is it? Points To Remember About Hip Replacement Surgery Hip replacement surgery removes damaged or ...

  1. Understanding the requirements of self-expandable stents for heart valve replacement: Radial force, hoop force and equilibrium.

    Science.gov (United States)

    Cabrera, María Sol; Oomens, Cees W J; Baaijens, Frank P T

    2017-04-01

    A proper interpretation of the forces developed during stent crimping and deployment is of paramount importance for a better understanding of the requirements for successful heart valve replacement. The present study combines experimental and computational methods to assess the performance of a nitinol stent for tissue-engineered heart valve implantation. To validate the stent model, the mechanical response to parallel plate compression and radial crimping was evaluated experimentally. Finite element simulations showed good agreement with the experimental findings. The computational models were further used to determine the hoop force on the stent and radial force on a rigid tool during crimping and self-expansion. In addition, stent deployment against ovine and human pulmonary arteries was simulated to determine the hoop force on the stent-artery system and the equilibrium diameter for different degrees of oversizing. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  2. Replacement of major nuclear power plant components for service life extension

    International Nuclear Information System (INIS)

    Novak, S.

    1987-01-01

    Problems are discussed associated with replacement of nuclear power plant components with the aim to extend their original scheduled life. The existing foreign experience shows that it is technically feasible to replace practically all basic components for which the necessity of replacement is established. Data is summed up on the replacement of steam generators in US and West German nuclear power plants showing the duration of the job, the total consumption of manhours, the collective dose equivalent and the cost. Attention is also focused on implemented and projected replacements of circulation pipes in nuclear power plants abroad. Based on these figures, the cost is estimated of the replacement of the reactor vessel and the steam generators for WWER-440 nuclear power plants. The conclusion is arrived at that even based on a conservative estimate, the extension by 20 years of the service life of a nuclear power plant is economically more effective than the construction of a new plant. (Z.M.) 2 tabs., 15 refs., 3 figs

  3. The Reliable Replacement Warhead Program: Background and Current Developments

    National Research Council Canada - National Science Library

    Medalia, Jonathan

    2008-01-01

    ...), part of a larger Stockpile Stewardship Program (SSP), replaces components. Modifying some components would require a nuclear test, but the United States has observed a test moratorium since 1992...

  4. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  5. Prosthetic valve sparing aortic root replacement: an improved technique.

    Science.gov (United States)

    Leacche, Marzia; Balaguer, Jorge M; Umakanthan, Ramanan; Byrne, John G

    2008-10-01

    We describe a modified surgical technique to treat patients with a previous history of isolated aortic valve replacement who now require aortic root replacement for an aneurysmal or dissected aorta. This technique consists of replacing the aortic root with a Dacron conduit, leaving intact the previously implanted prosthesis, and re-implanting the coronary arteries in the Dacron graft. Our technique differs from other techniques in that we do not leave behind any aortic tissue remnant and also in that we use a felt strip to obliterate any gap between the old sewing ring and the newly implanted graft. In our opinion, this promotes better hemostasis. We demonstrate that this technique is safe, feasible, and results in acceptable outcomes.

  6. 42 CFR 482.82 - Condition of participation: Data submission, clinical experience, and outcome requirements for re...

    Science.gov (United States)

    2010-10-01

    ..., clinical experience, and outcome requirements for re-approval of transplant centers. 482.82 Section 482.82... Hospitals Transplant Center Data Submission, Clinical Experience, and Outcome Requirements § 482.82 Condition of participation: Data submission, clinical experience, and outcome requirements for re-approval...

  7. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  8. [Echinocandins: searching for differences. The example of their use in patients requiring continuous renal replacement therapy].

    Science.gov (United States)

    de la Llama-Celis, Natalia; Huarte-Lacunza, Rafael; Gómez-Baraza, Cristina; Cañamares-Orbis, Iciar; Sebastián-Aldeanueva, Manuel; Arrieta-Navarro, Raquel

    2012-12-01

    The echinocandins have a growing role in the treatment of fungal infections because of their novel mechanism of action. This is reflected in recently published management guidelines, but available in vitro data, animal studies, and clinical studies do not clearly differentiate the three agents in class. Comparative clinical efficacy among agents within the class, pharmacokinetic profiles in special populations, pharmacoeconomics justifications, and place in therapy have been largely unanswered. They share many common properties but marketing strategies of drug manufacturers are engaged in product differentiation. Although exist similarities in the pharmacokinetic (PK) profiles of the echinocandins, limited data have been published regarding their pharmacokinetics in continuous renal replacement therapy (CRRT) patients. The pharmacokinetics of drug removal in critically ill patients receiving CRRT is very complex, with multiple variables affecting clearance. This review outlines the basic principles that determine whether a dose adjustment is required. Two studies with data on PK parameters of micafungin and anidulafungin in CRRT patients have been published and are compared following that basic principles in the review.

  9. Replacement Condition Detection of Railway Point Machines Using an Electric Current Sensor

    Science.gov (United States)

    Sa, Jaewon; Choi, Younchang; Chung, Yongwha; Kim, Hee-Young; Park, Daihee; Yoon, Sukhan

    2017-01-01

    Detecting replacement conditions of railway point machines is important to simultaneously satisfy the budget-limit and train-safety requirements. In this study, we consider classification of the subtle differences in the aging effect—using electric current shape analysis—for the purpose of replacement condition detection of railway point machines. After analyzing the shapes of after-replacement data and then labeling the shapes of each before-replacement data, we can derive the criteria that can handle the subtle differences between “does-not-need-to-be-replaced” and “needs-to-be-replaced” shapes. On the basis of the experimental results with in-field replacement data, we confirmed that the proposed method could detect the replacement conditions with acceptable accuracy, as well as provide visual interpretability of the criteria used for the time-series classification. PMID:28146057

  10. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  11. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  12. Ethamsylate and blood loss in total hip replacement.

    Science.gov (United States)

    Keith, I

    1979-01-01

    Nineteen consecutive patients undergoing total hip replacement under epidural anaesthesia were randomly divided into two groups. The treatment group received 1000 mg of ethamsylate intravenously before induction of anaesthesia. Blood lost during surgery was measured by a colorimetric technique. Closed suction drains were used and all blood lost after operation collected for measurement. Ethamsylate did not decrease the average volumes of blood lost during or after the operation. Neither did it reduce the requirements for blood transfusion. Although there were no side-effects attributable to ethamyslate, there seems to be no indication for its use in total hip replacement under epidural anaesthesia.

  13. Installation technology of reactor internals on shroud replacement work

    International Nuclear Information System (INIS)

    Miyano, Hiroshi

    1999-01-01

    Since the replacement of large welded reactor internals much as a core shroud did not have a precedent in the world, quite a few technologies had to be developed. Especially for the installation of new core shroud, jet pumps, core plate and top guide, the accurate weld and fit-up techniques for large structures was required to secure their integrity. The vessel shielding system was utilized to reduce general area dose rate such that all replacement work. For jet pump installation, automatic remote welding machines were used for high radiation area. As for the core shroud, shroud support weld prep machining tool with high accuracy, jacking system to support fit-up, new weld machine for small work space and low heat input weld joint were developed. Shroud replacement work in Fukushima Dai-ichi NPS Unit 3 (1F-3) with application of these development techniques, was successfully accomplished. The technology is applied for 1F-2 replacement work also. (author)

  14. [Effects of growth hormone replacement therapy on bone metabolism].

    Science.gov (United States)

    Yamamoto, Masahiro; Sugimoto, Toshitsugu

    2014-06-01

    Growth hormone (GH) as well as insulin like growth factor-1 (IGF-1) are essential hormones to maintain homeostasis of bone turnover by activating osteoblastogenesis and osteoclastogenesis. Results from GH replacement therapy for primary osteoporosis and adult-onset GH deficiency (AGHD) suggest that one year or more treatment period by this agent is required to gain bone mineral density (BMD) over the basal level after compensating BMD loss caused by dominant increase in bone resorption which was observed at early phase of GH treatment. A recent meta-analysis demonstrates the efficacy of GH replacement therapy on increases in BMD in male patients with AGHD. Additional analyses are needed to draw firm conclusions in female patients with AGHD, because insufficient amounts of GH might be administrated to them without considerations of influence of estrogen replacement therapy on IGF-1 production. Further observational studies are needed to clarify whether GH replacement therapy prevent fracture risk in these patients.

  15. Meal Replacement Mass Reduction Integration and Acceptability Study

    Science.gov (United States)

    Sirmons, T.; Douglas, G.; Schneiderman, J.; Slack, K.; Whitmire, A.; Williams, T.; Young, M.

    2018-01-01

    The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore we are challenged to reduce the mass of the food system by 10% while maintaining safety, nutrition, and acceptability to support crew health and performance for exploration missions. Meal replacement with nutritionally balanced, 700-900 calorie bars was identified as a method to reduce mass. However, commercially available products do not meet the requirements for a meal replacement in the spaceflight food system. The purpose of this task was to develop a variety of nutritionally balanced, high quality, breakfast replacement bars, which enable a 10% food mass savings. To date, six nutrient-dense meal replacement bars have been developed, all of which meet spaceflight nutritional, microbiological, sensory, and shelf-life requirements. The four highest scoring bars were evaluated based on final product sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. color and texture), and microbiological compliance over a period of two years to predict long-term acceptability. All bars maintained overall acceptability throughout the first year of storage, despite minor changes in color and texture. However, added vitamins C, B1, and B9 degraded rapidly in fortified samples of Banana Nut bars, indicating the need for additional development. In addition to shelf-life testing, four bar varieties were evaluated in the Human Exploration Research Analog (HERA), campaign 3, to assess the frequency with which actual meal replacement options may be implemented, based on impact to satiety and psychosocial measurements. Crewmembers (n=16) were asked to consume meal replacement bars every day for the first fifteen days of the mission and every three days for the second half of the mission. Daily surveys assessed the crew's responses to bar acceptability, mood, food fatigue and perceived stress. Preliminary results indicate that the

  16. Neutral Beam Injection Requirements and Design Issues for the National Compact Stellarator Experiment

    International Nuclear Information System (INIS)

    Kugel, H.W.; Neilson, H.; Reiersen, W.; Zarnstorff, M.

    2002-01-01

    The National Compact Stellarator Experiment (NCSX) will require 6 MW of 50 keV neutral beam injection (NBI) with initial pulse lengths of 500 msec and upgradeable to pulse lengths of 1.5 sec. This paper discusses the NCSX NBI requirements and design issues, and shows how these are provided by the candidate PBX-M [Princeton Beta Experiment-Modification] NBI system

  17. An Empirical Comparison of Discrete Choice Experiment and Best-Worst Scaling to Estimate Stakeholders' Risk Tolerance for Hip Replacement Surgery.

    Science.gov (United States)

    van Dijk, Joris D; Groothuis-Oudshoorn, Catharina G M; Marshall, Deborah A; IJzerman, Maarten J

    2016-06-01

    Previous studies have been inconclusive regarding the validity and reliability of preference elicitation methods. The aim of this study was to compare the metrics obtained from a discrete choice experiment (DCE) and profile-case best-worst scaling (BWS) with respect to hip replacement. We surveyed the general US population of men aged 45 to 65 years, and potentially eligible for hip replacement surgery. The survey included sociodemographic questions, eight DCE questions, and twelve BWS questions. Attributes were the probability of a first and second revision, pain relief, ability to participate in sports and perform daily activities, and length of hospital stay. Conditional logit analysis was used to estimate attribute weights, level preferences, and the maximum acceptable risk (MAR) for undergoing revision surgery in six hypothetical treatment scenarios with different attribute levels. A total of 429 (96%) respondents were included. Comparable attribute weights and level preferences were found for both BWS and DCE. Preferences were greatest for hip replacement surgery with high pain relief and the ability to participate in sports and perform daily activities. Although the estimated MARs for revision surgery followed the same trend, the MARs were systematically higher in five of the six scenarios using DCE. This study confirms previous findings that BWS or DCEs are comparable in estimating attribute weights and level preferences. However, the risk tolerance threshold based on the estimation of MAR differs between these methods, possibly leading to inconsistency in comparing treatment scenarios. Copyright © 2016 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  18. Esophageal replacement in children: Challenges and long-term outcomes

    Directory of Open Access Journals (Sweden)

    Giampiero Soccorso

    2016-01-01

    Full Text Available Replacement of a nonexistent or damaged esophagus continues to pose a significant challenge to pediatric surgeons. Various esophageal replacement grafts and techniques have not produced consistently good outcomes to emulate normal esophagus. Therefore, many techniques are still being practiced and recommended with no clear consensus. We present a concise literature review of the currently used techniques and with discussions on the advantages and anticipated morbidity. There are no randomized controlled pediatric studies to compare different types of esophageal replacements. Management and graft choice are based on geographical and personal predilections rather than on any discernible objective data. The biggest series with long-term outcome are reported for gastric transposition and colonic replacement. Comparison of different studies shows no significant difference in early (graft necrosis and anastomotic leaks or late complications (strictures, poor feeding, gastro-esophageal reflux, tortuosity of the graft, and Barrett′s esophagus. The biggest series seem to have lower complications than small series reflecting the decennials experience in their respective centers. Long-term follow-up is recommended following esophageal replacement for the development of late strictures, excessive tortuosity, and Barrett′s changes within the graft. Once child overcomes initial morbidity and establishes oral feeding, long-term consequences and complications of pediatric esophageal replacement should be monitored and managed in adult life.

  19. Turbine Control System Replacement at NPP NEK; System Specifics, Project Experience and Lessons Learned

    International Nuclear Information System (INIS)

    Mandic, D.; Zilavy, M. J.

    2010-01-01

    The main intention of this paper is to present feedback from the implementation of the new Turbine Control System (TCS) replacement project at Nuclear Power Plant (NPP) NEK - Krsko. From the plant construction time and the first plant start-up in 1981, the NPP NEK TG (Turbine-Generator) set was controlled and monitored by DEH (Digital Electro Hydraulic) Mod II Control System designed in 70's based on P2500 CPU and number of I/O controllers and modules. The P2500 CPU and associated controllers were built with discrete TTL components (TTL logic chips) and the P2500 CPU had 64k of 16 bit words of ferrite core memory. For that time, DEH Mod II had sophisticated MCR (Main Control Room) HMI (Human Machine Interface) based on digital functional keyboards, one alphanumeric black and white CRT monitor and printer. After twenty eight years of operation and because of several other reasons that are explained in the paper, NEK decided to replace the old DEH Mod II Control system with the new Emerson Ovation based DCS (Distributed Control System) on redundant platform for the control and monitoring of secondary plant systems in the NPP Krsko (NEK), and the new system was named PDEH (Programmable Digital Electro Hydraulic) TCS. In May 2007, NEK signed the turn-key contract with Westinghouse Electric Company (WEC) for the project of replacement of the TCS, Turbine Emergency Trip System (ETS), Moisture Separator Reheater (MSR) control and some other control and monitoring functions. WEC subcontracted a number of other companies for equipment delivery, AE (Architect Engineering Design) activities, specific software development tasks (changes of KFSS - Krsko Full Scope Simulator and PIS - Process Information System interface) and field installation activities. The subject project enveloped implementation of PDEH system on three application platforms: BG KFSS (Background KFSS), FG KFSS (Foreground KFSS) and PDEH system installed in the plant. The HMI for the BG KFSS platform

  20. Mitral valve replacement in infants and children 5 years of age or younger: Evolution in practice and outcome over three decades with a focus on supra-annular prosthesis implantation

    Science.gov (United States)

    Tierney, Elif Seda Selamet; Pigula, Frank A.; Berul, Charles I.; Lock, James E.; del Nido, Pedro J.; McElhinney, Doff B.

    2014-01-01

    Objective Successful mitral valve replacement in young children is limited by the lack of small prosthetic valves. Supra-annular prosthesis implantation can facilitate mitral valve replacement with a larger prosthesis in children with a small annulus, but little is known about its effect on the outcomes of mitral valve replacement in young children. Methods One hundred eighteen children underwent mitral valve replacement at 5 years of age or younger from 1976–2006. Mitral valve replacement was supra-annular in 37 (32%) patients. Results Survival was 74% ± 4% at 1 year and 56% ± 5% at 10 years but improved over time (10-year survival of 83% ± 7% from 1994–2006). Factors associated with worse survival included earlier mitral valve replacement date, age less than 1 year, complete atrioventricular canal, and additional procedures at mitral valve replacement, but not supra-annular mitral valve replacement. As survival improved during our more recent experience, the risks of supra-annular mitral valve replacement became apparent; survival was worse among patients with a supra-annular prosthesis after 1991. A pacemaker was placed in 18 (15%) patients within 1 month of mitral valve replacement and was less likely in patients who had undergone supra-annular mitral valve replacement. Among early survivors, freedom from redo mitral valve replacement was 72% ± 5% at 5 years and 45% ± 7% at 10 years. Twenty-one patients with a supra-annular prosthesis underwent redo mitral valve replacement. The second prosthesis was annular in 15 of these patients and upsized in all but 1, but 5 required pacemaker placement for heart block. Conclusions Supra-annular mitral valve replacement was associated with worse survival than annular mitral valve replacement in our recent experience. Patients with supra-annular mitral valve replacement were less likely to have operative complete heart block but remained at risk when the prosthesis was subsequently replaced. PMID:18954636

  1. Capacitor requirements for controlled thermonuclear experiments and reactors

    International Nuclear Information System (INIS)

    Boicourt, G.P.; Hoffman, P.S.

    1975-01-01

    Future controlled thermonuclear experiments as well as controlled thermonuclear reactors will require substantial numbers of capacitors. The demands on these units are likely to be quite severe and quite different from the normal demands placed on either present energy storage capacitors or present power factor correction capacitors. It is unlikely that these two types will suffice for all necessary Controlled Thermonuclear Research (CTR) applications. The types of capacitors required for the various CTR operating conditions are enumerated. Factors that influence the life, cost and operating abilities of these types of capacitors are discussed. The problems of capacitors in a radiation environment are considered. Areas are defined where future research is needed. Some directions that this research should take are suggested. (U.S.)

  2. Capacitor requirements for controlled thermonuclear experiments and reactors

    International Nuclear Information System (INIS)

    Boicourt, G.P.; Hoffman, P.S.

    1975-01-01

    Future controlled thermonuclear experiments as well as controlled thermonuclear reactors will require substantial numbers of capacitors. The demands on these units are likely to be quite severe and quite different from the normal demands placed on either present energy storage capacitors or present power factor correction capacitors. It is unlikely that these two types will suffice for all necessary Controlled Thermonuclear Research (CTR) applications. The types of capacitors required for the various CTR operating conditions are enumerated. Factors that influence the life, cost and operating abilities of these types of capacitors are discussed. The problems of capacitors in a radiation environment are considered. Areas are defined where future research is needed. Some directions that this research should take are suggested

  3. The effect of replacing lactose by starch on protein and fat digestion in milk-fed veal calves

    NARCIS (Netherlands)

    Pluschke, A.M.; Gilbert, M.S.; Williams, B.A.; Borne, van den J.J.G.C.; Schols, H.A.; Gerrits, W.J.J.

    2016-01-01

    Replacing dairy components from milk replacer (MR) with vegetable products has been previously associated with decreased protein and fat digestibility in milk-fed calves resulting in lower live weight gain. In this experiment, the major carbohydrate source in MR, lactose, was partly replaced with

  4. Defining line replaceable units

    NARCIS (Netherlands)

    Parada Puig, J. E.; Basten, R. J I

    2015-01-01

    Defective capital assets may be quickly restored to their operational condition by replacing the item that has failed. The item that is replaced is called the Line Replaceable Unit (LRU), and the so-called LRU definition problem is the problem of deciding on which item to replace upon each type of

  5. A strategy for the phased replacement of CANDU digital control computers

    International Nuclear Information System (INIS)

    Hepburn, G.A.

    2001-01-01

    Significant developments have occurred with respect to the replacement of the Plant Digital Control Computers (DCCs) on CANDU plants in the past six months. This paper summarises the conclusions of the condition assessment carried out on these machines at Point Lepreau Generating Station, and describes a strategy for a phased transition to a replacement system based on today's technology. Most elements of the strategy are already in place, and sufficient technical work has been done to allow those components which have been assessed as requiring prompt attention to be replaced in a matter of months. (author)

  6. Ultrasonic aqueous cleaning as a replacement for chlorinated solvent cleaning

    International Nuclear Information System (INIS)

    Thompson, L.M.; Simandl, R.F.

    1992-01-01

    The Oak Ridge Y-12 Plant has been involved in the replacement of chlorinated solvents since 1982. One of the most successful replacement efforts has been the substitution of vapor degreasers or soak tanks using chlorinated solvents with ultrasonic cleaning using aqueous detergents. Recently, funding was obtained from the Department of Energy Office (DOE) of Technology Development to demonstrate this technology. A unit has been procured and installed in the vacuum pump shop area to replace the use of a solvent soak tank. Initially, the solvents used in the shop were CFC-113 and a commercial brand cleaner which contained both perchloroethylene and methylene chloride. While the ultrasonic unit was being procured, a terpene-based solvent was used. Generally, parts were soaked overnight in order to soften baked-on vanish. Many times, wire brushing was used to help remove remaining contamination. Initial testing with the ultrasonic cleaner indicated cleaning times of 20 min were as effective as the overnight solvent soaks in removing contamination. Wire brushing was also not required following the ultrasonic cleaning as was sometimes required with the solvent soak

  7. Strength Characteristics of Quarry Dust in Replacement of Sand

    Science.gov (United States)

    Shyam Prakash, K.; Hanumantha Rao, Ch, Dr

    2017-08-01

    The replacement of natural fine aggregate by using quarry dust leads to consumption of generated quarry dust, the requirement of land fill area can be reduced and solves the natural sand scarcity problem. The sand availability as a fine aggregate at low cost which needs the reason to search as a alternative material. Even it causes saddle to dump the crusher dust at one place which causes environmental pollution. The chemical analysis, specific gravity, sieve analysis and compressive strength is identified for various percentage and grades of concrete by replacement of sand with quarry dust.

  8. Modulator reliability and bandwidth improvement: replacing tetrodes with MOSFETs

    International Nuclear Information System (INIS)

    Donaldson, A.R.

    1982-01-01

    Three types of power MOS field effect transistors were studied with the intent of replacing a parallel pair of vacuum tube tetrodes in a linear modulator. The tetrodes have the shortest lifetimes of any other tubes in the system. The FETs offer definite performance advantages when compared to bipolar transistors and definite cost advantages when compared to vacuum tubes. Replacement of the tetrodes does however require careful consideration of voltage, current and to a lesser extent bandwidth capability in order to enhance overall modulator reliability without compromising present performance

  9. Requirements for light water reactors

    International Nuclear Information System (INIS)

    Hedin, F.

    2009-01-01

    The EUR (European Utilities Requirements) is an organization founded in 1991 whose aim was to write down the European specifications and requirements for the future reactors of third generation. EUR gathers most of the nuclear power producers of Europe. The EUR document has been built on the large and varied experience of EUR members and can be used to elaborate invitations to tender for nuclear projects. 4000 requirements only for the nuclear part of the plant are listed, among which we have: -) the probability of core meltdown for a reactor must be less than 10 -6 per year, -) the service life of every component that is not replaceable must be 60 years, -) the capacity of the spent fuel pool must be sufficient to store 10-15 years of production without clearing out. The EUR document is both open and complete: every topic has been considered, it does not favor any type of reactor but can ban any technology that is too risky or has an unfavourable feedback experience. The assessment of the conformity with the EUR document of 7 reactor projects (BWR 90/, EPR, EP1000, SWR1000, ABWR, AP1000 and VVER-AES-92) has already be made. (A.C.)

  10. Advances in Rosetta structure prediction for difficult molecular-replacement problems

    International Nuclear Information System (INIS)

    DiMaio, Frank

    2013-01-01

    Modeling advances using Rosetta structure prediction to aid in solving difficult molecular-replacement problems are discussed. Recent work has shown the effectiveness of structure-prediction methods in solving difficult molecular-replacement problems. The Rosetta protein structure modeling suite can aid in the solution of difficult molecular-replacement problems using templates from 15 to 25% sequence identity; Rosetta refinement guided by noisy density has consistently led to solved structures where other methods fail. In this paper, an overview of the use of Rosetta for these difficult molecular-replacement problems is provided and new modeling developments that further improve model quality are described. Several variations to the method are introduced that significantly reduce the time needed to generate a model and the sampling required to improve the starting template. The improvements are benchmarked on a set of nine difficult cases and it is shown that this improved method obtains consistently better models in less running time. Finally, strategies for best using Rosetta to solve difficult molecular-replacement problems are presented and future directions for the role of structure-prediction methods in crystallography are discussed

  11. Aortic regurgitation after valve-sparing aortic root replacement: modes of failure.

    Science.gov (United States)

    Oka, Takanori; Okita, Yutaka; Matsumori, Masamichi; Okada, Kenji; Minami, Hitoshi; Munakata, Hiroshi; Inoue, Takeshi; Tanaka, Akiko; Sakamoto, Toshihito; Omura, Atsushi; Nomura, Takuo

    2011-11-01

    Despite the positive clinical results of valve-sparing aortic root replacement, little is known about the causes of reoperations and the modes of failure. From October 1999 to June 2010, 101 patients underwent valve-sparing aortic root replacement using the David reimplantation technique. The definition of aortic root repair failure included the following: (1) intraoperative conversion to the Bentall procedure; (2) reoperation performed because of aortic regurgitation; and (3) aortic regurgitation equal to or greater than a moderate degree at the follow-up. Sixteen patients were considered to have repair failure. Three patients required intraoperative conversion to valve replacement, 3 required reoperation within 3 months, and another 8 required reoperation during postoperative follow-up. At initial surgery 5 patients had moderate to severe aortic regurgitation, 6 patients had acute aortic dissections, 3 had Marfan syndrome, 2 had status post Ross operations, 3 had bicuspid aortic valves, and 1 had aortitis. Five patients had undergone cusp repair, including Arantius plication in 3 and plication at the commissure in 2. The causes of early failure in 6 patients included cusp perforation (3), cusp prolapse (3), and severe hemolysis (1). The causes of late failure in 10 patients included cusp prolapse (4), commissure dehiscence (3), torn cusp (2), and cusp retraction (1). Patients had valve replacements at a mean of 23 ± 20.9 months after reimplantation and survived. Causes of early failure after valve-sparing root replacement included technical failure, cusp lesions, and steep learning curve. Late failure was caused by aortic root wall degeneration due to gelatin-resorcin-formalin glue, cusp degeneration, or progression of cusp prolapse. Copyright © 2011 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  12. Low-flow CO₂ removal integrated into a renal-replacement circuit can reduce acidosis and decrease vasopressor requirements.

    Science.gov (United States)

    Forster, Christian; Schriewer, Jens; John, Stefan; Eckardt, Kai-Uwe; Willam, Carsten

    2013-07-24

    Lung-protective ventilation in patients with ARDS and multiorgan failure, including renal failure, is often paralleled with a combined respiratory and metabolic acidosis. We assessed the effectiveness of a hollow-fiber gas exchanger integrated into a conventional renal-replacement circuit on CO₂ removal, acidosis, and hemodynamics. In ten ventilated critically ill patients with ARDS and AKI undergoing renal- and respiratory-replacement therapy, effects of low-flow CO₂ removal on respiratory acidosis compensation were tested by using a hollow-fiber gas exchanger added to the renal-replacement circuit. This was an observational study on safety, CO₂-removal capacity, effects on pH, ventilator settings, and hemodynamics. CO₂ elimination in the low-flow circuit was safe and was well tolerated by all patients. After 4 hours of treatment, a mean reduction of 17.3 mm Hg (-28.1%) pCO₂ was observed, in line with an increase in pH. In hemodynamically instable patients, low-flow CO₂ elimination was paralleled by hemodynamic improvement, with an average reduction of vasopressors of 65% in five of six catecholamine-dependent patients during the first 24 hours. Because no further catheters are needed, besides those for renal replacement, the implementation of a hollow-fiber gas exchanger in a renal circuit could be an attractive therapeutic tool with only a little additional trauma for patients with mild to moderate ARDS undergoing invasive ventilation with concomitant respiratory acidosis, as long as no severe oxygenation defects indicate ECMO therapy.

  13. Replacement of the instrumentation and control system of Tore Supra

    International Nuclear Information System (INIS)

    Leveque, P.

    1995-02-01

    The control system of the Tore-Supra is a wide and complex system that cannot be interrupted while running without significant consequences on the operating of the machine. Replacing the current system cannot be achieved in a global way without immobilisation and high costs. Therefore partial changes have been decided on. This work presents the detailed analysis of the arrangements and the operating of the system that will be replaced: the pro's and con's that have appeared through experience are related. The possibilities that the new apparatus offers are also examined. A method of step by step replacements had to be set up in order to assess the means, funds, term of achievement, performance and quality of the overall project. (TEC). 15 refs., 29 figs

  14. The scientific and technical requirements for biology at Australia's Replacement Research Reactor

    International Nuclear Information System (INIS)

    2001-01-01

    A Symposium and Workshop on Neutrons for Biology was held in the School of Biochemistry and Molecular Biology at the University of Melbourne, under the auspices of AINSE, Univ of Melbourne and ANSTO. Invited talks were given on the subjects of Genome, small-angle neutron scattering (SANS) as a critical framework for understanding bio-molecular, neutron diffraction at high and low resolution, and the investigation of viruses and large-scale biological structures using neutrons. There were also talks from prominent NMR practitioners and X-ray protein crystallographers, with substantial discussion about how the various methods might fit together in the future. Significant progress was made on defining Australia's needs, which include a strong push to use SANS and reflectometry for the study of macromolecular complexes and model membranes, and a modest network of supporting infrastructure in Brisbane, Melbourne and the Sydney Basin. Specific recommendations were that the small-angle neutron scattering and reflectometry instruments in the Replacement Research Reactor (RRR) be pursued with high priority, that there be no specific effort to provide high-resolution protein-crystallography facilities at the RRR, but that a watching brief be kept on instrumentation and sample-preparation technologies elsewhere. A watch be kept on inelastic and quasielastic neutron scattering capabilities elsewhere, although these methods will not initially be pursued at the RRR and that should be input from this community into the design of the biochemistry/chemistry laboratories at the Replacement Research Reactor. It was also recommended that a small number of regional facilities be established (or enhanced) to allow users to perform deuteration of biomolecules. These facilities would be of significant value to the NMR and neutron scattering communities

  15. Transcatheter aortic valve replacement

    Science.gov (United States)

    ... gov/ency/article/007684.htm Transcatheter aortic valve replacement To use the sharing features on this page, please enable JavaScript. Transcatheter aortic valve replacement (TAVR) is surgery to replace the aortic valve. ...

  16. Replacement method and enhanced replacement method versus the genetic algorithm approach for the selection of molecular descriptors in QSPR/QSAR theories.

    Science.gov (United States)

    Mercader, Andrew G; Duchowicz, Pablo R; Fernández, Francisco M; Castro, Eduardo A

    2010-09-27

    We compare three methods for the selection of optimal subsets of molecular descriptors from a much greater pool of such regression variables. On the one hand is our enhanced replacement method (ERM) and on the other is the simpler replacement method (RM) and the genetic algorithm (GA). These methods avoid the impracticable full search for optimal variables in large sets of molecular descriptors. Present results for 10 different experimental databases suggest that the ERM is clearly preferable to the GA that is slightly better than the RM. However, the latter approach requires the smallest amount of linear regressions and, consequently, the lowest computation time.

  17. A comparison of minimally invasive and standard aortic valve replacement.

    Science.gov (United States)

    Stoliński, Jarosław; Plicner, Dariusz; Grudzień, Grzegorz; Wąsowicz, Marcin; Musiał, Robert; Andres, Janusz; Kapelak, Bogusław

    2016-10-01

    The study objective was to compare aortic valve replacement through a right anterior minithoracotomy with aortic valve replacement through a median sternotomy. With propensity score matching, we selected 211 patients after aortic valve replacement through a right anterior minithoracotomy and 211 patients after aortic valve replacement who underwent operation between January 2010 and December 2013. Perioperative outcomes were analyzed, and multivariable logistic regression analysis of risk factors of postoperative morbidity was performed. For propensity score-matched patients, hospital mortality was 1.0% in the aortic valve replacement through a right anterior minithoracotomy group and 1.4% in the aortic valve replacement group (P = 1.000). Stroke occurred in 0.5% versus 1.4% (P = .615), myocardial infarction occurred in 1.4% versus 1.9% (P = 1.000), and new onset of atrial fibrillation occurred in 12.8% versus 24.2% (P = .003) of patients in the aortic valve replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Postoperative drainage was 353.5 ± 248.6 mL versus 544.3 ± 324.5 mL (P replacement through a right anterior minithoracotomy and aortic valve replacement groups, respectively. Mediastinitis occurred in 2.8% of patients after aortic valve replacement and in 0.0% of patients after aortic valve replacement through a right anterior minithoracotomy surgery (P = .040). Intensive care unit stay (1.3 ± 1.2 days vs 2.6 ± 2.6 days) and hospital stay (5.7 ± 1.6 days vs 8.7 ± 4.4 days) were statistically significantly shorter in the aortic valve replacement through a right anterior minithoracotomy group. Aortic valve replacement through a right anterior minithoracotomy surgery resulted in reduced postoperative morbidity (odds ratio, 0.4; P replacement through a right anterior minithoracotomy surgery resulted in a reduced infection rate, diminished postoperative bleeding and blood

  18. Valve-sparing aortic root replacement in children: intermediate-term results.

    Science.gov (United States)

    Patel, Nishant D; Arnaoutakis, George J; George, Timothy J; Allen, Jeremiah G; Alejo, Diane E; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2011-03-01

    Valve-sparing root replacement (VSRR) is an attractive option for aortic aneurysm in children with low-operative risk, but mid- and late-term results are not yet known. Between 1997 and 2009, 56 children (mean age 11.5 years) underwent VSRR at our institution. Twenty-six (46.4%) had Marfan syndrome and 24 (42.8%) had Loeys-Dietz syndrome. Mean preoperative max sinus diameter was 4.2±0.8 cm (Z-score 7.7±2.9). Five (8.9%) had >2+ aortic insufficiency (AI). Two (3.6%) underwent David I reimplantation with a straight-tube, 12 (21.4%) had a Yacoub remodeling procedure, and 42 (75.0%) had reimplantation using a Valsalva-graft. There were one (1.8%) operative and three (5.4%) late deaths. One patient required reoperation for bleeding and one required late repair of a distal pseudoaneurysm. Mean follow-up was 5.2 years (range 0-12 years). No patients suffered thromboembolic events or had endocarditis. Of the 12 remodeling patients, four (33.3%) developed >2+ AI and required aortic valve repair or replacement. No patient developed >2+ AI after reimplantation. VSRR in children is a safe alternative to aortic root replacement with mechanical or biological prostheses. In this particular group of patients with connective tissue disorders and proclivity toward annular dilation and late AI, reimplantation is superior to remodeling.

  19. Detector Control System for an LHC experiment - User Requirements Document

    CERN Document Server

    CERN. Geneva

    1997-01-01

    The purpose of this document is to provide the user requirements for a detector control system kernel for the LHC experiments following the ESA standard PSS-05 [1]. The first issue will be used to provide the basis for an evaluation of possible development philosophies for a kernel DCS. As such it will cover all the major functionality but only to a level of detail sufficient for such an evaluation to be performed. Many of the requirements are therefore intentionally high level and generic, and are meant to outline the functionality that would be required of the kernel DCS, but not yet to the level of the detail required for implementation. The document is also written in a generic fashion in order not to rule out any implementation technology.

  20. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  1. Operating Experience Review of Tritium-in-Water Monitors

    Energy Technology Data Exchange (ETDEWEB)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  2. Changing of the guard: reducing infection when replacing neural pacemakers.

    Science.gov (United States)

    Pepper, Joshua; Meliak, Lara; Akram, Harith; Hyam, Jonathan; Milabo, Catherine; Candelario, Joseph; Foltynie, Thomas; Limousin, Patricia; Curtis, Carmel; Hariz, Marwan; Zrinzo, Ludvic

    2017-04-01

    OBJECTIVE Infection of deep brain stimulation (DBS) hardware has a significant impact on patient morbidity. Previous experience suggests that infection rates appear to be higher after implantable pulse generator (IPG) replacement surgery than after the de novo DBS procedure. In this study the authors examine the effect of a change in practice during DBS IPG replacements at their institution. METHODS Starting in January 2012, patient screening for methicillin-resistant Staphylococcus aureus (MRSA) and, and where necessary, eradication was performed prior to elective DBS IPG change. Moreover, topical vancomycin was placed in the IPG pocket during surgery. The authors then prospectively examined the infection rate in patients undergoing DBS IPG replacement at their center over a 3-year period with at least 9 months of follow-up. RESULTS The total incidence of infection in this prospective consecutive series of 101 IPG replacement procedures was 0%, with a mean follow-up duration of 24 ± 11 months. This was significantly lower than the authors' previously published historical control group, prior to implementing the change in practice, where the infection rate for IPG replacement was 8.5% (8/94 procedures; p = 0.003). CONCLUSIONS This study suggests that a change in clinical practice can significantly lower infection rates in patients undergoing DBS IPG replacement. These simple measures can minimize unnecessary surgery, loss of benefit from chronic stimulation, and costly hardware replacement, further improving the cost efficacy of DBS therapies.

  3. Moderator inlet line hanger replacement for Pickering nuclear power station

    International Nuclear Information System (INIS)

    Kirkpatrick, R.A.; Bowman, J.M.; Symmons, W.R.; El-Nesr, S.

    1988-01-01

    Ontario Hydro's Pickering Nuclear Generating Station (PNGS), Units 1 and 2 were shutdown for large scale fuel channel replacement. Other nonroutine inspection and maintenance activities were performed to determine the overall condition of the units and it was seen that a moderator inlet line hanger (identified as HR-29) had failed in both units. Subsequent inspections during planned maintenance outages of Pickering NGS Units 3 and 4 revealed that hanger HR-29 had failed and required replacement. A research program was conducted to find a suitable technique. These problems included accessing tooling through small inspection ports, manipulating tooling from a significant distance and the high radiation fields within the vault. This paper describes the program undertaken to replace hanger HR-29. (author)

  4. Experiments of progressive replacement in Cesar at operation temperature. Uranium-plutonium fuels. Study performed within the frame of the CEA-EURATOM - No. 002 64 9 TRUF contract - 'Plutonium recycling'

    International Nuclear Information System (INIS)

    Bosser, Roland; Cuny, Gerard; Hoffmann, Alain; Langlet, Gerard; Laponche, Bernard; Morier, Francis; Penet, Francois; Charbonneau, Serge

    1969-08-01

    Experiments of progressive replacement (or substitution) of uranium-plutonium alloy fuels are part of a general program of experimental studies which are aimed at testing the methods used by the CEA to calculate the evolution of nuclear power reactors (calculation of spectrum in plutonium-containing fuels and validity of data used in these calculations, calculation of cross sections). Such progressive replacements have been performed in Aquilon (with heavy water as moderator) and measurements have been performed by oscillation in Marius and Cesar (graphite moderator). Herein reported experiments have been performed at 20, 100 and 200 C during a first campaign in 1966, and at 300, 400 and 450 C during a second campaign in 1968. Measurements are interpreted by means of the Coregraf 2 code. The report presents experimental conditions in Cesar, the measurement principle and the interpretation method (substitution experiments, enriched uranium calibration, interpretation steps, and temperature coefficient measurement), the obtained results and their discussion [fr

  5. Jejunal Replacement of Stomach in Two Children with Total Gastric Necrosis

    Directory of Open Access Journals (Sweden)

    Onder Ozden

    2014-04-01

    Full Text Available Total gastrectomy is an extremely rare procedure in children and experience with its replacement is very limited. We present two patients who had jejunal replacement due to total gastric necrosis. The first patient was a- 2-year-old boy who admitted with a history of caustic ingestion. He was taken operation because of gastric perforation and necrosis. Anastomosis was applied by using jejunal segments. The second patient was an 11-years-old girl who left diaphragmatic hernia and acute gastric volvulus. At laparotomy, Total gastrectomy and Hunt-Lawrence type gastroesophostomy were made. Reconstruction with jejunum is thought as a good option in total gastric necrosis according to our 2 patient experiences. [Cukurova Med J 2014; 39(2.000: 403-407

  6. Microcontroller-based locking in optics experiments

    International Nuclear Information System (INIS)

    Huang, K.; Le Jeannic, H.; Ruaudel, J.; Morin, O.; Laurat, J.

    2014-01-01

    Optics experiments critically require the stable and accurate locking of relative phases between light beams or the stabilization of Fabry-Perot cavity lengths. Here, we present a simple and inexpensive technique based on a stand-alone microcontroller unit to perform such tasks. Easily programmed in C language, this reconfigurable digital locking system also enables automatic relocking and sequential functioning. Different algorithms are detailed and applied to fringe locking and to low- and high-finesse optical cavity stabilization, without the need of external modulations or error signals. This technique can readily replace a number of analog locking systems advantageously in a variety of optical experiments

  7. Microcontroller-based locking in optics experiments.

    Science.gov (United States)

    Huang, K; Le Jeannic, H; Ruaudel, J; Morin, O; Laurat, J

    2014-12-01

    Optics experiments critically require the stable and accurate locking of relative phases between light beams or the stabilization of Fabry-Perot cavity lengths. Here, we present a simple and inexpensive technique based on a stand-alone microcontroller unit to perform such tasks. Easily programmed in C language, this reconfigurable digital locking system also enables automatic relocking and sequential functioning. Different algorithms are detailed and applied to fringe locking and to low- and high-finesse optical cavity stabilization, without the need of external modulations or error signals. This technique can readily replace a number of analog locking systems advantageously in a variety of optical experiments.

  8. Microcontroller-based locking in optics experiments

    Energy Technology Data Exchange (ETDEWEB)

    Huang, K. [Laboratoire Kastler Brossel, UPMC-Sorbonne Universités, CNRS, ENS-PSL Research University, Collège de France, 4 place Jussieu, 75005 Paris (France); State Key Laboratory of Precision Spectroscopy, East China Normal University, Shanghai 200062 (China); Le Jeannic, H.; Ruaudel, J.; Morin, O.; Laurat, J., E-mail: julien.laurat@upmc.fr [Laboratoire Kastler Brossel, UPMC-Sorbonne Universités, CNRS, ENS-PSL Research University, Collège de France, 4 place Jussieu, 75005 Paris (France)

    2014-12-15

    Optics experiments critically require the stable and accurate locking of relative phases between light beams or the stabilization of Fabry-Perot cavity lengths. Here, we present a simple and inexpensive technique based on a stand-alone microcontroller unit to perform such tasks. Easily programmed in C language, this reconfigurable digital locking system also enables automatic relocking and sequential functioning. Different algorithms are detailed and applied to fringe locking and to low- and high-finesse optical cavity stabilization, without the need of external modulations or error signals. This technique can readily replace a number of analog locking systems advantageously in a variety of optical experiments.

  9. Service water system repair/replacement guidelines: Planning and implementation

    International Nuclear Information System (INIS)

    Frederick, G.J.; Gandy, D.W.; Peterson, A.G. Jr.; Findlan, S.J.

    1993-11-01

    Service water system failures have prompted concerns related to extended power plant operating life and plant availability. Selection and procurement of materials for repair or replacement of piping and components may be the most important factors in improving service water system reliability. The authors examined factors that contribute to reduced SWS reliability. The factors include material selection inadequacies, water treatment problems, operational/maintenance practices, fabrication procedures, environmental degradation mechanisms, and coating problems. The authors investigated material selection for replacement and repair, taking into account fabrication practices, environmental concerns, and cost comparisons of materials. They examined specific components such as piping, pumps, valves, and heat exchangers with regard to material selection and fabrication practice. Although proper material selection is essential in upgrading and maintaining the designed functions of a SWS, it is critical to address SWS repair/replacement activities with a systemwide approach. Degradation of materials in SWS applications are plant specific, depending on factors unique to each site such as geographic location, existing materials, operating procedures, and environment. All these characteristics must be addressed in making repair/replacement decisions. Criteria that must be integrated for successful long-term operation of SWS include the following: Materials selection (upgrade or in-kind replacement), Evaluation of root cause or nature of the failure mechanism, Scope of the repair/replacement activities, Material compatibility of the existing materials, Operational and maintenance procedures, Code or jurisdictional requirements, Economic considerations, Water treatment programs, System design improvements or modifications

  10. Replacement of Dislodged Gastrostomy Tubes After Stoma Dilation in the Pediatric Emergency Department

    Directory of Open Access Journals (Sweden)

    Shiloni Bhambani

    2017-04-01

    Full Text Available Introduction: A dislodged gastrostomy tube (GT is a common complaint that requires evaluation in the pediatric emergency department (ED and, on occasion, will require stoma dilation to successfully replace the GT. The objective of this study was to describe the frequency that stoma dilation is required, the success rate of replacement, complications encountered, and the techniques used to confirm placement of the GT after dilation. Methods: We conducted a retrospective medical record review of children 0–18 years who presented to the pediatric ED from February 2013 through February 2015 with a dislodged GT that required stoma dilation by pediatric emergency physicians with serially increasing Foley catheter sizes prior to successful placement of the GT. Results: We reviewed a total of 302 encounters in 215 patients, with 97 (32% of the encounters requiring stoma dilation prior to replacing a GT. The median amount of dilation was 2 French between the initial Foley catheter size and the final GT size. There was a single complication of a mal-positioned balloon that was identified at the index visit. No delayed complications were encountered. We performed confirmation of placement in all patients. The two most common forms of confirmation were aspiration of gastric contents (56/97 [58%] followed by contrast radiograph in 39 (40%. Conclusion: The practice of serial dilation of a gastrostomy stoma site to allow successful replacement of a gastrostomy tube in pediatric patients who present to the ED with a dislodged gastrostomy tube is generally successful and without increased complication. All patients received at least one form of confirmation for appropriate GT placement with the most common being aspiration of gastric contents.

  11. Ankle replacement - discharge

    Science.gov (United States)

    ... total - discharge; Total ankle arthroplasty - discharge; Endoprosthetic ankle replacement - discharge; Osteoarthritis - ankle ... You had an ankle replacement. Your surgeon removed and reshaped ... an artificial ankle joint. You received pain medicine and were ...

  12. Prevalence of pannus formation after aortic valve replacement: clinical aspects and surgical management.

    Science.gov (United States)

    Sakamoto, Yoshimasa; Hashimoto, Kazuhiro; Okuyama, Hiroshi; Ishii, Shinichi; Shingo, Taguchi; Kagawa, Hiroshi

    2006-01-01

    Pannus formation after aortic valve replacement is not common, but obstruction due to chronic pannus is one of the most serious complications of valve replacement. The causes of pannus formation are still unknown and effective preventive methods have not been fully elucidated. We reviewed our clinical experience of all patients who underwent reoperation for prosthetic aortic valve obstruction due to pannus formation between 1973 and 2004. We compared the initial 18-year period of surgery, when the Björk-Shiley tilting-disk valve was used, and the subsequent 13-year period of surgery, when the St. Jude Medical valve was used. Seven of a total of 390 patients (1.8%) required reoperation for prosthetic aortic valve obstruction due to pannus formation. All seven patients were women; four patients underwent resection of the pannus and three patients needed replacement of the valve. The frequency of pannus formation in the early group was 2.4% (6/253), whereas it was 0.73% (1/137) in the late group (P Pannus was localized at the minor orifice of the Björk-Shiley valve in the early group and turbulent transvalvular blood flow was considered to be one of the important factors triggering its growth. We also consider that small bileaflet valves have the possibility of promoting pannus formation and that the implantation of a larger prosthesis can contribute to reducing the occurrence of pannus.

  13. Optimal elastomeric scaffold leaflet shape for pulmonary heart valve leaflet replacement.

    Science.gov (United States)

    Fan, Rong; Bayoumi, Ahmed S; Chen, Peter; Hobson, Christopher M; Wagner, William R; Mayer, John E; Sacks, Michael S

    2013-02-22

    Surgical replacement of the pulmonary valve (PV) is a common treatment option for congenital pulmonary valve defects. Engineered tissue approaches to develop novel PV replacements are intrinsically complex, and will require methodical approaches for their development. Single leaflet replacement utilizing an ovine model is an attractive approach in that candidate materials can be evaluated under valve level stresses in blood contact without the confounding effects of a particular valve design. In the present study an approach for optimal leaflet shape design based on finite element (FE) simulation of a mechanically anisotropic, elastomeric scaffold for PV replacement is presented. The scaffold was modeled as an orthotropic hyperelastic material using a generalized Fung-type constitutive model. The optimal shape of the fully loaded PV replacement leaflet was systematically determined by minimizing the difference between the deformed shape obtained from FE simulation and an ex-vivo microCT scan of a native ovine PV leaflet. Effects of material anisotropy, dimensional changes of PV root, and fiber orientation on the resulting leaflet deformation were investigated. In-situ validation demonstrated that the approach could guide the design of the leaflet shape for PV replacement surgery. Copyright © 2012 Elsevier Ltd. All rights reserved.

  14. Neutral Beam Injection Requirements and Design Issues for the National Compact Stellarator Experiment; TOPICAL

    International Nuclear Information System (INIS)

    H.W. Kugel; H. Neilson; W. Reiersen; M. Zarnstorff

    2002-01-01

    The National Compact Stellarator Experiment (NCSX) will require 6 MW of 50 keV neutral beam injection (NBI) with initial pulse lengths of 500 msec and upgradeable to pulse lengths of 1.5 sec. This paper discusses the NCSX NBI requirements and design issues, and shows how these are provided by the candidate PBX-M[Princeton Beta Experiment-Modification] NBI system

  15. Remote replacement of TF [toroidal field] and PF [poloidal field] coils for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.; Watkin, D.C.; Hollis, M.J.; DePew, R.E.; Kuban, D.P.

    1990-01-01

    The use of deuterium-tritium fuel in the Compact Ignition Tokamak will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion devices auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. In-vessel remote maintenance included replacement of divertor and first wall hardware, faraday shields, and for an in-vessel inspection system. Provision for remote replacement of a vacuum vessel sector, toroidal field coil or poloidal field ring coil was not included in the project baseline. As a result of recent coil failures experienced at a number of facilities, the CIT project decided to reconsider the question of remote recovery from a coil failure and, in January of 1990, initiated a coil replacement study. This study focused on the technical requirements and impact on fusion machine design associated with remote recovery from any coil failure

  16. Appropriate statistical methods are required to assess diagnostic tests for replacement, add-on, and triage

    NARCIS (Netherlands)

    Hayen, Andrew; Macaskill, Petra; Irwig, Les; Bossuyt, Patrick

    2010-01-01

    To explain which measures of accuracy and which statistical methods should be used in studies to assess the value of a new binary test as a replacement test, an add-on test, or a triage test. Selection and explanation of statistical methods, illustrated with examples. Statistical methods for

  17. Patients Unicondylar Knee Replacement vs. Total Knee Replacement

    OpenAIRE

    Hedra Eskander

    2017-01-01

    The aim of this review article is to analyse the clinical effectiveness of total knee replacement (TKR) compared to unicondylar knee replacement (UKR) on patients. In terms of survival rates, revision rates and postoperative complications. The keywords used were: knee arthroplasty. Nearly three thousand articles were found on 25 August 2016. Of those, only twenty-five were selected and reviewed because they were strictly focused on the topic of this article. Compared with those who have TKR, ...

  18. Artificial Disc Replacement

    Science.gov (United States)

    ... Spondylolisthesis BLOG FIND A SPECIALIST Treatments Artificial Disc Replacement (ADR) Patient Education Committee Jamie Baisden The disc ... Disc An artificial disc (also called a disc replacement, disc prosthesis or spine arthroplasty device) is a ...

  19. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    Energy Technology Data Exchange (ETDEWEB)

    David E. Korns

    2012-05-01

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  20. Is tricuspid annuloplasty increasing surgical mortality and morbidity during mitral valve replacement? A single-centre experience.

    Science.gov (United States)

    Verdonk, Constance; Darmon, Arthur; Cimadevilla, Claire; Lepage, Laurent; Raffoul, Richard; Nataf, Patrick; Vahanian, Alec; Messika-Zeitoun, David

    2017-12-06

    Performance of tricuspid annuloplasty (TA) in patients undergoing mitral valve surgery is recommended based on the degree of tricuspid regurgitation and tricuspid annulus size, but is often underused. To evaluate the impact of combined TA on in-hospital outcome in patients undergoing mitral valve replacement (MVR). We selected all consecutive patients who underwent MVR for native valve disease. Clinical, echocardiographic and in-hospital complications were obtained from chart review. We identified 287 patients (mean age 62±17 years; 44% men). Combined TA was performed in 165 patients (57%), who had more rheumatic disease (71% vs. 24%; P<0.0001) and mitral stenosis (55% vs. 22%; P<0.0001), but less endocarditis (4% vs. 31%; P<0.0001), were more often in atrial fibrillation (54% vs. 22%; P<0.0001), were more severely symptomatic (80% vs. 57%; P<0.0001), presented with a higher systolic pulmonary artery pressure (SPAP) (53±16 vs. 45±15mmHg; P=0.0002) and were less likely to have required emergency surgery (17% vs. 38%; P<0.0001). Despite this higher risk profile, in-hospital mortality was slightly lower (5% vs. 13%; P=0.02) and complication rates were similar (redo surgery 22% vs. 16% [P=0.18] and tamponade 20% vs. 15% [P=0.15]). After adjustment for age, sex, functional class, SPAP, emergency surgery and concomitant coronary artery bypass graft or aortic valve replacement surgery, combined TA was not associated with an increased rate of in-hospital death (P=0.08) or major complications (P=0.89). In a consecutive series of patients who underwent MVR, TA did not seem to have a negative impact on immediate outcome. Hence, additional performance of TA at the time of MVR should not be declined on the basis of an increased surgical risk. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  1. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    . To shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega...... replacement was chosen in each company. Findings – The study shows that platform replacements primarily challenge managers' existing knowledge about platform architectures. A distinction can be made between “width” and “height” in platform replacements, and it is crucial that managers observe this in order...... to challenge their existing knowledge about platform architectures. Issues on technologies, architectures, components and processes as well as on segments, applications and functions are identified. Practical implications – Practical implications are summarized and discussed in relation to a framework...

  2. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  3. Assessment of the Swedish EQ-5D experience-based value sets in a total hip replacement population.

    Science.gov (United States)

    Nemes, Szilárd; Burström, Kristina; Zethraeus, Niklas; Eneqvist, Ted; Garellick, Göran; Rolfson, Ola

    2015-12-01

    All patients undergoing elective total hip replacement (THR) in Sweden are asked to complete a survey, including the EQ-5D. Thus far, EQ-5D values have been presented using the UK TTO value set based on hypothetical values. Shift to the use of the recently introduced Swedish experience-based value set, derived from a representative Swedish population, is an appealing alternative. To investigate how accurate the Swedish experience-based VAS value set predicts observed EQ VAS values and to compare correlations between Swedish and UK value sets including two provisional value sets derived from the THR population. Pre- and one-year postoperative data from 56,062 THR patients from the Swedish Hip Arthroplasty Register were used. Agreement between the observed and the predicted EQ VAS values was assessed with correlation. Based on pre- and postoperative data, we constructed two provisional VAS value sets. Correlations between observed and calculated values using the Swedish VAS value set were moderate (r = 0.46) in preoperative data and high (r = 0.72) in postoperative data. Correlations between UK and register-based value sets were constantly lower compared to Swedish value sets. Register-based values and Swedish values were highly correlated. The Swedish value sets are more accurate in terms of representation of the Swedish THR patients than the currently used UK TTO value set. We find it feasible to use the experience-based Swedish value sets for further presentation of EQ-5D values in the Swedish THR population.

  4. Replacement value of millet for maize on performance and ...

    African Journals Online (AJOL)

    The experiment was conducted to determine the performance characteristics and haematological indices of broiler chickens fed varying levels of millet as a replacement for maize. Three hundred and thirty day old Marshal Broiler chickens were assigned to 5 dietary treatment groups. Each treatment was replicated 3 times ...

  5. Flow boiling test of GDP replacement coolants

    International Nuclear Information System (INIS)

    Park, S.H.

    1995-01-01

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C 4 F 10 and C 4 F 8 , were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C 4 F 10 mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C 4 F 10 weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd

  6. Calculating evidence-based renal replacement therapy – Introducing an excel-based calculator to improve prescribing and delivery in renal replacement therapy – A before and after study

    OpenAIRE

    Cottle, Daniel; Mousdale, Stephen; Waqar-Uddin, Haroon; Tully, Redmond; Taylor, Benjamin

    2015-01-01

    Background Transferring the theoretical aspect of continuous renal replacement therapy to the bedside and delivering a given “dose” can be difficult. In research, the “dose” of renal replacement therapy is given as effluent flow rate in ml kg−1 h−1. Unfortunately, most machines require other information when they are initiating therapy, including blood flow rate, pre-blood pump flow rate, dialysate flow rate, etc. This can lead to confusion, resulting in patients receiving inappropriate doses...

  7. Does early use of enzyme replacement therapy alter the natural history of mucopolysaccharidosis I? Experience in three siblings.

    Science.gov (United States)

    Laraway, Sarah; Breen, Catherine; Mercer, Jean; Jones, Simon; Wraith, James E

    2013-07-01

    Enzyme replacement therapy is widely used as treatment for mucopolysaccharidosis I (MPS I), and there is evidence that this produces improvement in certain clinical domains. There does appear to be variation in the response of clinical features to treatment once these are established. In a reported sibling pair, when enzyme replacement therapy was commenced pre-symptomatically in the younger child, the natural history of the condition appeared to be affected. We present data from three siblings treated with enzyme replacement therapy at different ages which supports this finding. Copyright © 2013 Elsevier Inc. All rights reserved.

  8. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  9. Contact replacement for NMR resonance assignment.

    Science.gov (United States)

    Xiong, Fei; Pandurangan, Gopal; Bailey-Kellogg, Chris

    2008-07-01

    Complementing its traditional role in structural studies of proteins, nuclear magnetic resonance (NMR) spectroscopy is playing an increasingly important role in functional studies. NMR dynamics experiments characterize motions involved in target recognition, ligand binding, etc., while NMR chemical shift perturbation experiments identify and localize protein-protein and protein-ligand interactions. The key bottleneck in these studies is to determine the backbone resonance assignment, which allows spectral peaks to be mapped to specific atoms. This article develops a novel approach to address that bottleneck, exploiting an available X-ray structure or homology model to assign the entire backbone from a set of relatively fast and cheap NMR experiments. We formulate contact replacement for resonance assignment as the problem of computing correspondences between a contact graph representing the structure and an NMR graph representing the data; the NMR graph is a significantly corrupted, ambiguous version of the contact graph. We first show that by combining connectivity and amino acid type information, and exploiting the random structure of the noise, one can provably determine unique correspondences in polynomial time with high probability, even in the presence of significant noise (a constant number of noisy edges per vertex). We then detail an efficient randomized algorithm and show that, over a variety of experimental and synthetic datasets, it is robust to typical levels of structural variation (1-2 AA), noise (250-600%) and missings (10-40%). Our algorithm achieves very good overall assignment accuracy, above 80% in alpha-helices, 70% in beta-sheets and 60% in loop regions. Our contact replacement algorithm is implemented in platform-independent Python code. The software can be freely obtained for academic use by request from the authors.

  10. Replacing soybean meal for cottonseed meal on performance of lactating dairy cows.

    Science.gov (United States)

    Imaizumi, Hugo; De Souza, Jonas; Batistel, Fernanda; Santos, Flávio Augusto Portela

    2016-01-01

    Cottonseed meal (CSM) is an alternative source of protein, and previous studies have been shown that it can replace soybean meal (SBM) without decrease animal performance. However, Brazilian CSM has a different chemical composition compared with the usual CSM reported in the literature. The objective of this experiment was to evaluate the effects of replacing SBM for Brazilian CSM on performance and energy balance of mid-lactating dairy cows. Forty-two Holstein cows were used in a replicate 3 × 3 Latin square design. Increasing contents of CSM (0, 15, and 30% of dry matter (DM)) were fed in diets to replace SBM. Milk yield and feed efficiency were linearly reduced with the replacement of CSM for SBM (P = 0.001). Milk fat content tended to increase quadratically (P = 0.07) with CSM addition. Replacing SBM for CSM affected milk protein content quadratically (P = 0.05). Milk urea nitrogen and plasma urea nitrogen (PUN) tended to respond quadratically (P = 0.06 and 0.10) when CSM replaced SBM to the diets. Variation in body weight (BW) also responded quadratically as CSM replaced SBM (P = 0.05). Altogether, the findings suggest better performance when cows receive SBM diet compared with the Brazilian CSM diet.

  11. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  12. EXPERIMENTAL RESEARCH OF REGENERATIVE FEATURES IN BONE TISSUES AROUND IMPLANTS AFTER ONE-STAGE BILATERAL TOTAL HIP REPLACEMENT

    Directory of Open Access Journals (Sweden)

    V. M. Mashkov

    2012-01-01

    Full Text Available Objective: to research the specific features of regenerative processes of bone tissue around implants after one-stage bilateral total hip replacement in experiment. Material and methods: 27 total hip replacement operations have been performed in 18 rabbits of breed "chinchilla" to which bipolar femoral endoprosthesis made of titanic alloy PT-38, one type-size, with friction pair metal-on-metal and neck-shaft angle 165 degrees have been implanted: total unilateral hip replacement operations have been performed in 9 animals (control group, one-stage bilateral total hip replacement operations have been performed in 9 animals (experimental group. During research they have been on radiological and clinical checking-up. After the experiment the animals had histological tests of the tissues around endoprosthesis components. Results and conclusions: After one-stage bilateral total hip replacement in early terms of research more expressed changes of bone tissue in the form of its thinning and decompaction were found around implants. One-stage bilateral total hip replacement did not essentially influence on the speed of osteogenesis around endoprothesis components in comparison with unilateral total hip replacement, so in late terms of observation in both groups the fixing of endoprothesis components did not differ.

  13. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert

    Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism

    Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves

  14. Software for handling and replacement of missing data

    Directory of Open Access Journals (Sweden)

    Mayer, Benjamin

    2009-10-01

    Full Text Available In medical research missing values often arise in the course of a data analysis. This fact constitutes a problem for different reasons, so e.g. standard methods for analyzing data lead to biased estimates and a loss of statistical power due to missing values, since those methods require complete data sets and therefore omit incomplete cases for the analyses. Furthermore missing values imply a certain loss of information for what reason the validity of results of a study with missing values has to be rated less than in a case where all data had been available. For years there are methods for replacement of missing values (Rubin, Schafer to tackle these problems and solve them in parts. Hence in this article we want to present the existing software to handle and replace missing values on the one hand and give an outline about the available options to get information on the other hand. The methodological aspects of the replacement strategies are delineated just briefly in this article.

  15. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  16. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Science.gov (United States)

    2010-07-01

    ... treatment works owner, the applicant, its engineers, contractors, equipment manufacturers or suppliers; (b) The RBC failure has significantly increased the project's capital or operation and maintenance costs; (c) The modification/replacement project meets all requirements of EPA's construction grant and other...

  17. Aortic valve replacement during acute rheumatic fever.

    Science.gov (United States)

    Khan, A; Chi, S; Gonzalez-Lavin, L

    1978-07-01

    Emergency aortic valve replacement was performed during an attack of acute rheumatic fever in a 12-year-old black boy. He had an uneventful recovery and has remained asymptomatic 27 months after operation. In the light of this experience and that of others, one might conclude that the decision to operate on these patients should be based on the severity of the haemodynamic derangement rather than on the state of activity in the rheumatic process.

  18. Language Profile in Congenital Hypothyroid Children Receiving Replacement Therapy.

    Science.gov (United States)

    Soliman, Hend; Abdel Hady, Aisha Fawzy; Abdel Hamid, Asmaa; Mahmoud, Heba

    2016-01-01

    The aim of this work was to evaluate receptive and expressive language skills in children with congenital hypothyroidism receiving early hormonal replacement treatment before the age of 3 months and to identify any subtle areas of weaknesses in their language development to check the necessity for future language intervention. The study was conducted on 30 hypothyroid children receiving hormonal replacement. They were subdivided into group I (5-8 years 11 months; 12 cases) and group II (9-12 years 11 months; 18 cases). All patients were subjected to a protocol of assessment applied in the Diabetes, Endocrine and Metabolism Pediatric Unit (DEMPU) and evaluation of language skills by the REAL scale. The younger group reached average Arabic language scores, while the older group showed moderate language delay. Early replacement therapy supports language development in young children. However, longitudinal and follow-up studies are required to identify difficulties presenting at older ages that may affect children in the academic settings. © 2016 S. Karger AG, Basel.

  19. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  20. Primary total hip replacement for displaced subcapital fractures of the femur.

    Science.gov (United States)

    Taine, W H; Armour, P C

    1985-03-01

    The management of displaced subcapital fracture of the hip is still controversial because of the high incidence of complications after internal fixation or hemiarthroplasty. To avoid some of these complications we have used primary total hip replacement for independently mobile patients over 65 years of age. A total of 163 cases, operated on over four years, have been reviewed. There were relatively more dislocations after operation for fracture than after total replacement for arthritis, and these were associated with a posterior approach to the hip. Only seven revision operations have been required. Of 57 patients who were interviewed an average of 42 months after replacement, 62% had excellent or good results as assessed by the Harris hip score. All the others had major systemic disease which affected their assessment. This inadequacy of current systems of hip assessment is discussed. It is concluded that total hip replacement is the best management for a selected group of patients with this injury, and that further prospective studies are indicated.

  1. Replacing coal by tire powder in ceramic industry

    Energy Technology Data Exchange (ETDEWEB)

    Mothe, C.G. [Dept. de Processos Organicos, Escola de Quimica/CT/UFRJ, Rio de Janeiro, RJ (Brazil); Mothe Filho, H.F. [Dept. de Geociencias, Inst. de Agronomia/UFRRJ, Seropedica, RJ (Brazil)

    2005-07-01

    Nowadays preserving nature, recycling or reusing materials are good policies. Around ten million tires are put out by year in Brazil, and it is not known for how long they will remain in environment till their complete degradation. This research used tires to replace coal in ceramic processing. In this way it helps to protect environment, to reduce the consumption of mineral deposits and to save money. Results show that tire powder can replace coal to obtain ceramic material, using one percent of tire. Experiments were carried out using TA instruments SDT 2960, in air or nitrogen atmospheres, at heating rate of 10 C/min., flow 120 ml/min. TG/DTA curves of tire and coal have exothermic events at close temperatures between 450-600 C. At range of temperatures clay have endothermic events. (orig.)

  2. STREAM2016: Streaming Requirements, Experience, Applications and Middleware Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Geoffrey [Indiana Univ., Bloomington, IN (United States); Jha, Shantenu [Rutgers Univ., New Brunswick, NJ (United States); Ramakrishnan, Lavanya [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-10-01

    The Department of Energy (DOE) Office of Science (SC) facilities including accelerators, light sources and neutron sources and sensors that study, the environment, and the atmosphere, are producing streaming data that needs to be analyzed for next-generation scientific discoveries. There has been an explosion of new research and technologies for stream analytics arising from the academic and private sectors. However, there has been no corresponding effort in either documenting the critical research opportunities or building a community that can create and foster productive collaborations. The two-part workshop series, STREAM: Streaming Requirements, Experience, Applications and Middleware Workshop (STREAM2015 and STREAM2016), were conducted to bring the community together and identify gaps and future efforts needed by both NSF and DOE. This report describes the discussions, outcomes and conclusions from STREAM2016: Streaming Requirements, Experience, Applications and Middleware Workshop, the second of these workshops held on March 22-23, 2016 in Tysons, VA. STREAM2016 focused on the Department of Energy (DOE) applications, computational and experimental facilities, as well software systems. Thus, the role of “streaming and steering” as a critical mode of connecting the experimental and computing facilities was pervasive through the workshop. Given the overlap in interests and challenges with industry, the workshop had significant presence from several innovative companies and major contributors. The requirements that drive the proposed research directions, identified in this report, show an important opportunity for building competitive research and development program around streaming data. These findings and recommendations are consistent with vision outlined in NRC Frontiers of Data and National Strategic Computing Initiative (NCSI) [1, 2]. The discussions from the workshop are captured as topic areas covered in this report's sections. The report

  3. Effect of dietary citric acid supplementation and partial replacement ...

    African Journals Online (AJOL)

    Beluga is one of the most important fishes in Caspian Sea. The purpose of this experiment were to evaluate the effect of soybean meal (SBM) as a fishmeal (FM) partial replacement and citric acid (CA) supplement on the calcium (Ca) and phosphorus (P) of muscle, scute and serum of Beluga diets. Three isonitrogenous and ...

  4. Pipe replacement in a water supply network: coordinated versus uncoordinated replacement and budget effects

    NARCIS (Netherlands)

    Dijk, van D.; Hendrix, E.M.T.

    2016-01-01

    Operators of underground water supply networks are challenged with pipe replacement
    decisions, because pipes are subject to increased failure rates as they age and financial resources
    are often limited.We study the optimal replacement time and optimal number of pipe replacements
    such

  5. Oxford Partial Knee Replacement as a Gateway to Outpatient Arthroplasty “Lessons Learned along the Journey”

    Directory of Open Access Journals (Sweden)

    Michael E Berend

    2016-09-01

    Full Text Available The Oxford Partial Knee Replacement was approved for implantation in the US in 2004 after the surgeon completed an educational training requirement.  Since then my knee practiced has expanded to over 50% partial knee.  This experience coupled with refinement of surgical techniques, anesthesia protocols, and patient selection has facilitated the transformation to same day discharge for partial knee cases and has quickly transitioned to total hip, total knee, and selected revision surgeries.  Patient selection has also expanded for outpatient joints and is now based on medical screening criteria and insurance access.  Over a two-year period we have performed over 1,000 outpatient arthroplasty procedures with no readmissions for pain control.   Overall readmission rate for all reasons was 2%.  Patient satisfaction scores were 98% Great-Good for 2014-15.  The combination of a partial knee replacement practice and an outpatient joint program brings the best VALUE to the patients, surgeons, and the arthroplasty system and represents the future of arthroplasty care.

  6. Valve-sparing aortic root replacement in Loeys-Dietz syndrome.

    Science.gov (United States)

    Patel, Nishant D; Arnaoutakis, George J; George, Timothy J; Allen, Jeremiah G; Alejo, Diane E; Dietz, Harry C; Cameron, Duke E; Vricella, Luca A

    2011-08-01

    Loeys-Dietz syndrome (LDS) is a recently recognized aggressive aortic disorder characterized by root aneurysm, arterial tortuosity, hypertelorism, and bifid uvula or cleft palate. The results of prophylactic root replacement using valve-sparing procedures (valve-sparing root replacement [VSRR]) in patients with LDS is not known. We reviewed all patients with clinical and genetic (transforming growth factor-β receptor mutations) evidence of LDS who underwent VSRR at our institution. Echocardiographic and clinical data were obtained from hospital and follow-up clinic records. From 2002 to 2009, 31 patients with a firm diagnosis of LDS underwent VSRR for aortic root aneurysm. Mean age was 15 years, and 24 (77%) were children. One (3%) patient had a bicuspid aortic valve. Preoperative sinus diameter was 3.9±0.8 cm (z score 7.0±2.9) and 2 (6%) had greater than 2+ aortic insufficiency. Thirty patients (97%) underwent reimplantation procedures using a Valsalva graft. There were no operative deaths. Mean follow-up was 3.6 years (range, 0 to 7 years). One patient required late repair of a pseudoaneurysm at the distal aortic anastomosis, and 1 had a conversion to a David reimplantation procedure after a Florida sleeve operation. No patient suffered thromboembolism or endocarditis, and 1 (3%) patient experienced greater than 2+ late aortic insufficiency. No patient required late aortic valve repair or replacement. Loeys-Dietz syndrome is an aggressive aortic aneurysm syndrome that can be addressed by prophylactic aortic root replacement with low operative risk. Valve-sparing procedures have encouraging early and midterm results, similar to those in Marfan syndrome, and are an attractive option for young patients. Copyright © 2011 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  7. Conceptual requirements for large fusion experiment control, data, robotics, and management systems

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Sullivan, J.D.

    1987-05-01

    The conceptual system requirements for the control, data, robotics, and project management (CDRM) system for the next generation of fusion experiments are developed by drawing on the success of the Tara control and data system. The requirements are described in terms of an integrated but separable matrix of well-defined interfaces among the various systems and subsystems. The study stresses modularity, performance, cost effectiveness, and exportability

  8. Extended replacement of the thoracic aorta.

    Science.gov (United States)

    Hino, Yutaka; Okada, Kenji; Oka, Takanori; Inoue, Takeshi; Tanaka, Akiko; Omura, Atsushi; Kano, Hiroya; Okita, Yutaka

    2013-01-01

    We present our experience of total aortic arch replacement. Twenty-nine patients (21 males and 8 females; mean age 63.3 ± 13.3 years) with extended thoracic aortic aneurysms underwent graft replacement. The pathology of the diseased aorta was non-dissecting aneurysm in 11 patients, including one aortitis and aortic dissection in 18 patients (acute type A: one, chronic type A: 11, chronic type B: six). Five patients had Marfan syndrome. In their previous operation, two patients had undergone the Bentall procedure, three had endovascular stenting, one had aortic root replacement with valve sparing and 12 had hemi-arch replacement for acute type A dissection. Approaches to the aneurysm were as follows: posterolateral thoracotomy with rib-cross incision in 16, posterolateral thoracotomy extended to the retroperitoneal abdominal aorta in seven, mid-sternotomy and left pleurotomy in three, anterolateral thoracotomy with partial lower sternotomy in two and clam-shell incision in one patient. Extension of aortic replacement was performed from the aortic root to the descending aorta in 4, from the ascending aorta to the descending aorta in 17 and from the ascending to the abdominal aorta in eight patients. Arterial inflow for cardiopulmonary bypass consisted of the femoral artery in 15 patients, ascending aorta and femoral artery in seven, descending or abdominal aorta in five and ascending aorta in two. Venous drainage site was the femoral vein in 10, pulmonary artery in eight, right atrium in five, femoral artery with right atrium/pulmonary artery in four and pulmonary artery with right atrium in two patients. The operative mortality, 30-day mortality and hospital mortality was one (cardiac arrest due to aneurysm rupture), one (rupture of infected aneurysm) and one (brain contusion), respectively. Late mortality occurred in three patients due to pneumonia, ruptured residual aneurysm and intracranial bleeding. Actuarial survival at 5 years after the operations was 80.6

  9. Remotely replaceable fuel and feed nozzles for the NWCF calciner vessel

    International Nuclear Information System (INIS)

    Fletcher, R.D.; Carter, J.A.; May, K.W.

    1978-01-01

    The development and testing of remotely replaceable fuel and feed nozzles for calcination of liquid radioactive wastes in the calciner vessel of the New Waste Calcining Facility (NWCF) being built at the Idaho National Engineering Laboratory are described. A complete fuel nozzle assembly was fabricated and tested at the Remote Maintenance Development Facility to evolve design refinements, identify required support equipment, and develop handling techniques. The design also provided for remote replacement of the nozzle support carriage and adjacent feed and fuel pipe loops using two pairs of master-slave manipulators

  10. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints. Copyright © 2016 Elsevier Inc. All rights reserved.

  11. Mechanical characterization of structurally porous biomaterials built via additive manufacturing: experiments, predictive models, and design maps for load-bearing bone replacement implants.

    Science.gov (United States)

    Melancon, D; Bagheri, Z S; Johnston, R B; Liu, L; Tanzer, M; Pasini, D

    2017-11-01

    Porous biomaterials can be additively manufactured with micro-architecture tailored to satisfy the stringent mechano-biological requirements imposed by bone replacement implants. In a previous investigation, we introduced structurally porous biomaterials, featuring strength five times stronger than commercially available porous materials, and confirmed their bone ingrowth capability in an in vivo canine model. While encouraging, the manufactured biomaterials showed geometric mismatches between their internal porous architecture and that of its as-designed counterpart, as well as discrepancies between predicted and tested mechanical properties, issues not fully elucidated. In this work, we propose a systematic approach integrating computed tomography, mechanical testing, and statistical analysis of geometric imperfections to generate statistical based numerical models of high-strength additively manufactured porous biomaterials. The method is used to develop morphology and mechanical maps that illustrate the role played by pore size, porosity, strut thickness, and topology on the relations governing their elastic modulus and compressive yield strength. Overall, there are mismatches between the mechanical properties of ideal-geometry models and as-manufactured porous biomaterials with average errors of 49% and 41% respectively for compressive elastic modulus and yield strength. The proposed methodology gives more accurate predictions for the compressive stiffness and the compressive strength properties with a reduction of the average error to 11% and 7.6%. The implications of the results and the methodology here introduced are discussed in the relevant biomechanical and clinical context, with insight that highlights promises and limitations of additively manufactured porous biomaterials for load-bearing bone replacement implants. In this work, we perform mechanical characterization of load-bearing porous biomaterials for bone replacement over their entire design

  12. Carbon replacement and stability changes in short-term silvo-pastoralo experiments in Colombian Amazonia

    NARCIS (Netherlands)

    Mosquera Vidal, O.; Buurman, P.; Ramirez, B.L.; Amezquita, M.C.

    2012-01-01

    There is little information on the effects of land use change on soil Carbon stocks in Colombian Amazonia. Such information would be needed to assess the impact of this area on the global C cycle and the sustainability of agricultural systems that are replacing native forest. The aim of this study

  13. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  14. In this issue: Time to replace doctors’ judgement with computers

    Directory of Open Access Journals (Sweden)

    Simon de Lusignan

    2015-11-01

    Full Text Available Informaticians continue to rise to the challenge, set by the English Health Minister, of trying to replace doctors’ judgement with computers. This issue describes successes and where there are barriers. However, whilst there is progress this tends to be incremental and there are grand challenges to be overcome before computers can replace clinician. These grand challenges include: (1 improving usability so it is possible to more readily incorporate technology into clinical workflow; (2 rigorous new analytic methods that make use of the mass of available data, ‘Big data’, to create real-world evidence; (3 faster ways of meeting regulatory and legal requirements including ensuring privacy; (4 provision of reimbursement models to fund innovative technology that can substitute for clinical time and (5 recognition that innovations that improve quality also often increase cost. Informatics more is likely to support and augment clinical decision making rather than replace clinicians.

  15. Hip Replacement: MedlinePlus Health Topic

    Science.gov (United States)

    ... invasive hip replacement (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hip Replacement updates ... replacement - precautions Minimally invasive hip replacement Related Health Topics Hip Injuries and Disorders National Institutes of Health ...

  16. Aorto-right atrial fistula after ascending aortic replacement or aortic value replacement

    International Nuclear Information System (INIS)

    Zhi Aihua; Dai Ruping; Jiang Shiliang; Lu Bin

    2012-01-01

    Objective: To evaluate the CT features of aorto-right atrial fistula after aortic valve replacement (AVR) or ascending aortic replacement. Methods: Eighty-seven patients with aortic-right atrial fistula underwent CT after operation. The CT features were retrospectively analyzed. Fistula was measured according to maximum width of the shunt. Results: Aorto-right atrial fistula was detected in 87 patients after aortic valve replacement or ascending aortic replacement by CT scan. Among them, 25 patients were diagnosed as mild aorto-right atrial fistula, 47 patients as moderate, and 15 patients as severe. Thirty-seven patients underwent follow-up CT.Among them, 10 patients with mild to moderate aorto-right atrial fistula were considered to have complete regression, 8 patients with mild aorto-right atrial fistula considered to have incomplete regression, 14 patients with mild to moderate aorto-right atrial fistula considered to have stable condition, and 5 patients with moderate aorto-right atrial fistula considered to have progression at the 3-month follow-up. Conclusion: CT is a useful tool for defining aorto-right atrial fistula after AVR or ascending aortic replacement and for evaluating it in follow-up. (authors)

  17. Reaction kinetics of metal deposition via surface limited red-ox replacement of underpotentially deposited metal monolayers

    International Nuclear Information System (INIS)

    Gokcen, Dincer; Bae, Sang-Eun; Brankovic, Stanko R.

    2011-01-01

    The study of the kinetics of metal deposition via surface limited red-ox replacement of underpotentially deposited metal monolayers is presented. The model system was Pt submonolayer deposition on Au(1 1 1) via red-ox replacement of Pb and Cu UPD monolayers on Au(1 1 1). The kinetics of a single replacement reaction was studied using the formalism of the comprehensive analytical model developed to fit the open circuit potential transients from deposition experiments. The practical reaction kinetics parameters like reaction half life, reaction order and reaction rate constant are determined and discussed with their relevance to design and control of deposition experiments. The effects of transport limitation and the role of the anions/electrolyte on deposition kinetics are investigated and their significance to design of effective deposition process is discussed.

  18. Inspection and replacement of baffle assembly screws inside American reactor vessels

    International Nuclear Information System (INIS)

    Neal, K.; Chaumont, J.C.

    1999-01-01

    The baffle assembly inside the vessel of a 900 MWe reactor designed by Framatome, is made up of 44 plates fixed on 8 horizontal supports by a system of about 1000 screws. These plates undergo high neutron flux and the problem of screw cracking appeared at the end of the eighties in the first-generation reactors. The first operation on a large scale concerning the screws of a Westinghouse type reactor, was performed on the Tihange-1 power plant where Framatome controlled 960 screws and replaced 91. In 1997 as a consequence of the Belgian and French feedback experience, American plant operators launched a vast program of preventive actions: material analysis, inspection of baffle plate screws and replacement of defective screws. This program was held in cooperation with EPRI (electric power research institute) and under the control of NRC (nuclear regulatory commission). Framatome Technologies Inc (FTI) was in charge of the in-situ inspection and replacement of the screws. FTI designed special tools and equipment adapted to the 2-loop American reactors but the basis ideas were those applied on the Tihange reactor. The successful experience of FTI has allowed the firm to be commissioned for 6 2-loops American reactors. (A.C.)

  19. Total aortic arch replacement with the frozen elephant trunk technique: 10-year follow-up single-centre experience.

    Science.gov (United States)

    Ius, Fabio; Fleissner, Felix; Pichlmaier, Maximilian; Karck, Matthias; Martens, Andreas; Haverich, Axel; Shrestha, Malakh

    2013-11-01

    Since August 2001, the frozen elephant trunk (FET) technique has been used at our institution to treat degenerative or dissecting aneurysms involving the aortic arch and descending aorta as a potential 'single-stage' procedure. The aim of this study was to review our FET experience and to present the 10-year results. Between August 2001 and January 2012, 131 patients underwent FET implant with three different prostheses: the custom-made Chavan-Haverich (n = 66), the Jotec E-vita (n = 30) and the Vascutek Thoraflex (n = 35) prostheses. Concomitant procedures included aortic valve-sparing operations (David, n = 17) and aortic root replacement (Bentall, n = 25). Patient records and the first postoperative and last available computer tomography (CT) were retrospectively reviewed. Incidence of rethoracotomy for bleeding, stroke, spinal cord injury, prolonged ventilatory support (>96 h) and acute renal failure requiring dialysis were 18, 11, 1, 41 and 16%, respectively. In-hospital mortality was 15%. The mean follow-up was 42 ± 37 (range 1-134 months). At 1, 5 and 10 years, survivals were 82 ± 3, 72 ± 5 and 58 ± 8%, respectively. Freedoms from distal aortic operation were 81 ± 4, 67 ± 5 and 43 ± 13%, respectively. Thirty-six patients underwent 40 distal aortic operations, either open surgical (n = 22, 55%) or endovascular (n = 18, 45%). Chronic aortic dissection was identified as an independent risk factor for distal aortic operation (odds ratio = 3.8; 95% confidence interval 1.5-9.3; P = 0.004). At last CT control, false-lumen thrombosis rates up to 93% were achieved around the stent graft. An FET concept adds to the armament of the surgeon in the treatment of complex and diverse aortic arch pathologies. The preoperative patient risk profile explains the postoperative morbidity and in-hospital mortality. The FET can potentially be still a 'one-stage' procedure in selected patients. However, the extension of FET to patients with extensive aortic aneurysms has led

  20. Procurement and control of spare and replacement parts - a regulatory perspective

    International Nuclear Information System (INIS)

    Baker, E.T.; Grimes, B.K.; Merschoff, E.W.

    1987-01-01

    As the nuclear industry shifts from a construction to an operations orientation, a number of fundamental changes have occurred in the type of safety-related procurements and the manner in which the utilities accomplish these procurements. Specifically, procurements have shifted from the purchase of large systems and components by architect-engineers, and nuclear steam supply system (NSSS) suppliers to the procurement by utilities of subassemblies, individual pieces of equipment (e.g., breakers, relays), and small parts for repairing individual pieces of equipment. To ensure that equipment will continue to perform its intended function and to satisfy regulatory requirements utilities must consider several things: (1) does the equipment perform a safety function; (2) does the replacement part affect the safety function; and (3) does the replacement part affect the seismic or environmental qualification. If the answer to any of these questions is yes, the purchaser has two alternatives. He may procure the item as safety-related and require the supplier or manufacturer to comply with all the applicable technical and quality requirements or he may purchase the item commercial grade and perform the necessary inspections and tests to ensure the item meets the requirements, i.e., dedicate the item

  1. Optimization of steam generator replacement with virtual reality modeling

    International Nuclear Information System (INIS)

    Kim, Jeong H.; Suh, Kune Y.

    2008-01-01

    Nuclear power plants (NPPs) have to be carefully examined and maintained up to the point of replacing major components during the overhaul period for continued operation. Most understandably the cost of maintenance and upgrading will tend to increase with the NPP power. There is thus an escalating need for developing an optimized process management method to reduce the cost involved. Albeit the steam generators (SGs) may not directly affect the expected lifespan of NPP, thousands of tubes with diameter on the order of 3 cm in the SG operating at 320degC and 16 MPa may well tend to be called Achilles' heel of the pressurized water reactors (PWRs). For instance, the SGs of Kori Nuclear Unit 1 (KNU 1) were replaced in October 1998 after 20 years of service on account of aging and potential threat to operational safety. In the same year the SG tubes of Ulchin Nuclear Units 1 and 2 were ruptured to result in leakage of the primary coolant to the secondary side. As a result their SGs are planned to be replaced in a few years. There is, however, a limit to improving the replacement process by trial and error in practice on account of the size of NPP with the ensuing complexity in process management. This paper proposes an optimization method for the SG replacement process based on the KNU 1 experience in 1998. The whole process was simulated accounting for interactions of each part in virtual reality utilizing the computer aided design solution CATIA, and the digital process management solution DELMIA. (author)

  2. 'Emerging technologies for the changing global market' - Prioritization methodology for chemical replacement

    Science.gov (United States)

    Cruit, Wendy; Schutzenhofer, Scott; Goldberg, Ben; Everhart, Kurt

    1993-01-01

    This project served to define an appropriate methodology for effective prioritization of technology efforts required to develop replacement technologies mandated by imposed and forecast legislation. The methodology used is a semiquantitative approach derived from quality function deployment techniques (QFD Matrix). This methodology aims to weight the full environmental, cost, safety, reliability, and programmatic implications of replacement technology development to allow appropriate identification of viable candidates and programmatic alternatives. The results will be implemented as a guideline for consideration for current NASA propulsion systems.

  3. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy...... operations were completed as mini-sternotomies, 4 died later of noncardiac causes. The aortic cross-clamp and perfusion times were significantly different across all groups (P replacement...... is an excellent operation in selected patients, but its true advantages over conventional aortic valve replacement (other than a smaller scar) await evaluation by means of randomized clinical trial. The "extended mini-aortic valve replacement" operation, on the other hand, is a risky procedure that should...

  4. Optimal Replacement Policy of Jet Engine Modules from the Aircarrier's Point of View

    Directory of Open Access Journals (Sweden)

    Anita Domitrović

    2008-01-01

    Full Text Available A mathematical model for optimising preventive maintenanceof aircraft jet engine was developed by dynamic programming.Replacement planning for jet engine modules is regardedas a multistage decision process, while optimum modulereplacement is considered as a problem of equipment replacement.The goal of the optimal replacement policy of jet enginemodules is a defined series of decisions resulting in minimummaintenance costs. The model was programmed inC++ programming language and tested by using CFM56 jetengine data. The optimum maintenance strategy costs werecompared to costs of simpler experience-based maintenancestrategies. The results of the comparison j usti.JY further developmentand usage of the model in order to achieve significant costreduction for airline carriers.

  5. A new machine for continuous renal replacement therapy: from development to clinical testing.

    Science.gov (United States)

    Ricci, Zaccaria; Salvatori, Gabriella; Bonello, Monica; Ratanarat, Ranistha; Andrikos, Emilios; Dan, Maurizio; Piccinni, Pasquale; Ronco, Claudio

    2005-01-01

    A new continuous renal replacement therapy machine has been designed to fulfill the expectations of nephrologists and intensivists operating in the common ground of critical care nephrology. The new equipment is called Prismaflex and it is the natural evolution of the PRISMA machine that has been utilized worldwide for continuous renal replacement therapy in the last 10 years. The authors performed a preliminary alpha-trial to establish the usability, flexibility and reliability of the new device. Accuracy was also tested by recording various operational parameters during different intermittent and continuous renal replacement modalities during 62 treatments. This article will describe our first experience with this new device and touch upon the historic and technologic background leading to its development.

  6. The replacement principle in networked economies with single-peaked preferences

    DEFF Research Database (Denmark)

    Szwagrzak, Karol

    2016-01-01

    disequilibrium prices, etc. In these contexts suppliers and demanders naturally have single-peaked preferences. We evaluate transfer rules on the basis of the “replacement principle” (Thomson, J Econ Theory 76(1):145–168 1997; Moulin, Q J Econ 102:769–783 1987), the requirement that a change in an agent......’s preferences affects all other agents in the same direction in terms of welfare. We find that the only Pareto-efficient, participation-compatible, replication-invariant, and envy-free rule satisfying an appropriate formulation of the replacement principle is the “egalitarian rule” introduced by Bochet et al....... (Theor Econ 7:395–423 2012)....

  7. Definition of common support equipment and space station interface requirements for IOC model technology experiments

    Science.gov (United States)

    Russell, Richard A.; Waiss, Richard D.

    1988-01-01

    A study was conducted to identify the common support equipment and Space Station interface requirements for the IOC (initial operating capabilities) model technology experiments. In particular, each principal investigator for the proposed model technology experiment was contacted and visited for technical understanding and support for the generation of the detailed technical backup data required for completion of this study. Based on the data generated, a strong case can be made for a dedicated technology experiment command and control work station consisting of a command keyboard, cathode ray tube, data processing and storage, and an alert/annunciator panel located in the pressurized laboratory.

  8. Short communication: Bacterial counts in recycled manure solids bedding replaced daily or deep packed in freestalls.

    Science.gov (United States)

    Sorter, D E; Kester, H J; Hogan, J S

    2014-05-01

    An experiment was conducted to compare bacterial counts of mastitis pathogens in deep-packed manure solids bedding with those in manure solids bedding replaced daily from mattresses. Eighteen Holstein cows were housed in 1 pen with 18 stalls. One row of 9 stalls was equipped with mattresses topped with bedding. The back one-third of these stalls toward the alleyway was covered in 25 mm of recycled manure solids, which was removed daily for the next 6 d and replaced with bedding from the brisket board and lunge space areas of stalls. The second row of 9 stalls was bedded for 3 wk with 100 to 150 mm of deep-pack recycled manure bedding from which only fecal matter was removed daily. After 3 wk, bedding treatments were changed between rows in a switchback design. Mean total gram-negative bacterial counts did not differ between treatments throughout the experiment. Coliform and Klebsiella spp. bacterial counts were lower in daily replaced bedding compared with deep pack across the experiment and on each of d 0, 1, 2, and 6. Streptococcal counts were reduced in daily replacement stalls compared with deep-pack stalls on d 0 and greater in daily replacement stalls compared with deep-pack stalls on d 1, 2, and 6. Daily replacement of recycled manure bedding from the back one-third of the stalls appeared to be an effective approach to reducing exposure to coliforms, specifically Klebsiella, but not streptococci. However, bacterial counts in bedding from both treatments were elevated throughout the trial and resulted in considerable risk for exposure to teats and development of intramammary infections. Copyright © 2014 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  9. Mechanisms of metasomatism in the calcite-pitchblende system: 2. Replacement of pitchblende by calcite

    International Nuclear Information System (INIS)

    Dymkov, Yu.M.

    1996-01-01

    The principal mechanisms of the nasturan replacement by calcite -intrametasomatism, frontal metasomatism, dispersive metasomatism, and transformative metasomatism - are discussed in terms of G.L. Pospelov's (1973) concept. The main chemical condition required by the process is an oxidized environment, in which the tetravalent uranium of pitchblende or transitional reduced phases (coffinite) oxidizes to yield readily soluble uranyl compounds. The latter are replaced by calcite

  10. Replacement of a vessel head, an operation which today gets easily into its stride

    International Nuclear Information System (INIS)

    Mardon, P.; Chaumont, J.C.; Lambiotte, P.

    1995-01-01

    In 1992, one year after the detection of a leak in a vessel head of the Electricite de France (EDF) Bugey 4 reactor, the head was replaced by the Framatome-Jeumont Industrie Group. Today, this group, which has developed new methods and new tools to optimize the cost, the time-delay and the dosimetry of this kind of intervention, has performed 11 additional replacements, two of which on 1300 MWe power units. This paper describes step by step the successive operations required for a complete vessel head replacement, including the testing of safety systems before starting up the reactor. (J.S.). 7 photos

  11. Unilateral vs one stage bilateral total knee replacement in rheumatoid and osteoarthritis - A comparative study

    Directory of Open Access Journals (Sweden)

    Kiran E

    2005-01-01

    Full Text Available Background : A controversy exists regarding simultaneous or staged bilateral total knee replacement. Methods: Fifty patients undergoing simultaneous bilateral and 50 undergoing unilateral total knee arthroplasty were evaluated prospectively to compare the clinical, radiological results and complication rates. Eighty-four patients belonged to ASA category II or III preoperatively. The study included a high proportion of rheumatoid patients and osteoarthritis patients with severe deformities. Results: Bilateral group had greater blood loss and required more blood transfusion, but there was no difference in requirement of postoperative intensive care and the complication rates. Rheumatoid knees had lower pre and postoperative knee score and functional score as compared to osteoarthritic knees. Morbidity and mortality of one stage bilateral knee replacement was no greater than unilateral operation. Conclusion: Simultaneous bilateral knee replacement in younger patients with advanced rheumatoid arthritis is safe and effective

  12. Replacing the Engine In Your Car While You Are Still Driving It

    Energy Technology Data Exchange (ETDEWEB)

    Bjorklund, Eric A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-04

    Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with their own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.

  13. Acute renal failure requiring renal replacement therapy in the intensive care unit: impact on prognostic assessment for shared decision making.

    Science.gov (United States)

    Johnson, Robert F; Gustin, Jillian

    2011-07-01

    A 69-year-old female was receiving renal replacement therapy (RRT) for acute renal failure (ARF) in an intensive care unit (ICU). Consultation was requested from the palliative medicine service to facilitate a shared decision-making process regarding goals of care. Clinician responsibility in shared decision making includes the formulation and expression of a prognostic assessment providing the necessary perspective for a spokesperson to match patient values with treatment options. For this patient, ARF requiring RRT in the ICU was used as a focal point for preparing a prognostic assessment. A prognostic assessment should include the outcomes of most importance to a discussion of goals of care: mortality risk and survivor functional status, in this case including renal recovery. A systematic review of the literature was conducted to document published data regarding these outcomes for adult patients receiving RRT for ARF in the ICU. Forty-one studies met the inclusion criteria. The combined mean values for short-term mortality, long-term mortality, renal-function recovery of short-term survivors, and renal-function recovery of long-term survivors were 51.7%, 68.6%, 82.0%, and 88.4%, respectively. This case example illustrates a process for formulating and expressing a prognostic assessment for an ICU patient requiring RRT for ARF. Data from the literature review provide baseline information that requires adjustment to reflect specific patient circumstances. The nature of the acute primary process, comorbidities, and severity of illness are key modifiers. Finally, the prognostic assessment is expressed during a family meeting using recommended principles of communication.

  14. Effect of replacing maize with pride of barbados ( Delonix regia ...

    African Journals Online (AJOL)

    The five dietary treatments contained 0, 25, 50, 75 and 100% replacement levels of Delonix regia seed meal (DRSM) for maize in a completely randomized design experiment. The parameters investigated during the study were: feed intake, weight gain, feed conversion ratio and feed cost. At the end of the feeding trial, ...

  15. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series—Normal anatomy To use the sharing ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  16. Parental experience of enzyme replacement therapy for Hunter syndrome.

    Science.gov (United States)

    Buraczewska, M; O'Leary, D; Walsh, O; Monavari, A; Crushell, E

    2013-04-01

    We aimed to establish the profile of Irish patients with Hunter Syndrome (Mucopolysaccharidosis type II, MPS II) receiving weekly intravenous Enzyme Replacement Therapy (ERT) with recombinant iduronate-2-sulfatase and to assess the social impact and parental opinion of ERT through the use of a parental questionnaire. Nine patients aged 3.5- 14 years have received a mean of 2 (range 0.5-3.5) years of ERT. Treatment was associated with clinical improvements from baseline in hepatosplenomegaly in 6/7 (85%) respiratory manifestations in 4/6 (67%) and a mean reduction in urinary glycosaminoglycan excretion of 62%. Changes noted by parents included increased energy 3/9 (33%) and softening of skin, hair and facial features 8/9 (89%). Parents report that seven hours weekly were spent on hospitalizations for ERT. Parental employment was adversely affected in 8 (89%) families. One day of school/preschool (20%) was lost every week for 8 (89%) children. All parents believed the benefits of ERT out-weigh the difficulties involved. All families would welcome the introduction of home based therapy. In conclusion the social and educational burden of hospital-based ERT on these children and their families is significant. The introduction of home-based therapy is likely to improve overall quality of life for MPSII patients and their families.

  17. 24 CFR 891.405 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.405....405 Replacement reserve. (a) Establishment of reserve. The Owner shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance and repair and replacement of capital items...

  18. Design concept of a pump stage with replaceable hydraulic components and prediction of its performance curves

    International Nuclear Information System (INIS)

    Lugova, S O; Knyazeva, E G; Tverdokhleb, I B; Kochevsky, A N

    2010-01-01

    In many cases, centrifugal pump units are expected to deliver the required performance under varying operating conditions. In particular, the pumps for oil extraction and transportation should deliver a constant head, although their capacity often changes during the life cycle. In order to keep the efficiency at a high level and not to replace a whole pump, the authors suggest to replace in such cases only hydraulic components of the pump (impellers and stationary sections of diffuser channels) that are to be installed in the same casing. The paper describes an approach for designing of radial-flow impellers and sections of diffuser channels to be used as replaceable. It allows for delivering a required head and providing a high efficiency in a wide range of capacities. The components intended for smaller capacities are featured with narrower flow passages. However, the dimensions of replaceable components are the same. The paper describes also a numerical simulation of fluid flow in a pump stage with two sets of replaceable radial-flow impellers and sections of diffuser channels. The CFD software used in this research is ANSYS CFX 11. Good correspondence of results is observed. Difference in flow pattern at various capacities and its influence on the performance curves delivered with replaceable components is demonstrated. Basing on the obtained results, the analysis of energy losses is presented.

  19. Determining Optimal Replacement Policy with an Availability Constraint via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Shengliang Zong

    2017-01-01

    Full Text Available We develop a model and a genetic algorithm for determining an optimal replacement policy for power equipment subject to Poisson shocks. If the time interval of two consecutive shocks is less than a threshold value, the failed equipment can be repaired. We assume that the operating time after repair is stochastically nonincreasing and the repair time is exponentially distributed with a geometric increasing mean. Our objective is to minimize the expected average cost under an availability requirement. Based on this average cost function, we propose the genetic algorithm to locate the optimal replacement policy N to minimize the average cost rate. The results show that the GA is effective and efficient in finding the optimal solutions. The availability of equipment has significance effect on the optimal replacement policy. Many practical systems fit the model developed in this paper.

  20. Guidelines for the technical evaluation of replacement items in nuclear power plants (NCIG-11)

    International Nuclear Information System (INIS)

    Craig, W.E.; Fakhar, A.A.; Shulman, M.N.

    1989-12-01

    This document presents guidelines and supporting information for the technical evaluation of replacement items in nuclear power plants. These guidelines contain six major sections which provide the practical knowledge and a programmatic approach to determine the technical and quality requirements necessary to generate purchase documents to procure the proper replacement items. The technical evaluation methodology includes the following steps. (1) Identification of the need for a technical evaluation. (2) Component/part functional classification procedures. (3) Performance of a Failure Modes and Effects Analysis. (4) Selection of Critical Characteristics for Design Determination. (5) Performance of a ''Like-For-Like'' or ''Alternate'' item Evaluation. (6) Preparation of the Technical and Quality Requirements Specification. Work on this document was initiated in response to the increased emphasis by the utilities owning nuclear power plants and nuclear industry on procurement of replacement items for use in safety related applications at nuclear power plants. 20 refs., 9 figs., 14 tabs

  1. 24 CFR 880.602 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 880.602... Replacement reserve. (a) A replacement reserve must be established and maintained in an interest-bearing account to aid in funding extraordinary maintenance and repair and replacement of capital items. (1) Part...

  2. 24 CFR 891.855 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserves. 891.855... § 891.855 Replacement reserves. (a) The mixed-finance owner shall establish and maintain a replacement... the funds will be used to pay for capital replacement costs for the Section 202 or 811 supportive...

  3. Replacing Smartphones With Mini Tablet Technology: An Evaluation.

    Science.gov (United States)

    Maneval, Rhonda; Mechtel, Marci

    Handheld technology allows students to access point-of-care resources throughout the clinical experience. To assess the viability of replacing student smartphones with tablets, an evaluation project was undertaken. Overall, students were equally dissatisfied with the 2 types of tablets that were evaluated. Students saw the potential usefulness of tablets to manage clinical assignments, interact with the learning management system, and communicate with faculty, but not for retrieving information currently accessible on their phones.

  4. Complementary role of cardiac CT in the assessment of aortic valve replacement dysfunction

    Science.gov (United States)

    Moss, Alastair J; Dweck, Marc R; Dreisbach, John G; Williams, Michelle C; Mak, Sze Mun; Cartlidge, Timothy; Nicol, Edward D; Morgan-Hughes, Gareth J

    2016-01-01

    Aortic valve replacement is the second most common cardiothoracic procedure in the UK. With an ageing population, there are an increasing number of patients with prosthetic valves that require follow-up. Imaging of prosthetic valves is challenging with conventional echocardiographic techniques making early detection of valve dysfunction or complications difficult. CT has recently emerged as a complementary approach offering excellent spatial resolution and the ability to identify a range of aortic valve replacement complications including structural valve dysfunction, thrombus development, pannus formation and prosthetic valve infective endocarditis. This review discusses each and how CT might be incorporated into a multimodal cardiovascular imaging pathway for the assessment of aortic valve replacements and in guiding clinical management. PMID:27843568

  5. JET-ISX-B beryllium limiter experiment safety analysis report and operational safety requirements

    International Nuclear Information System (INIS)

    Edmonds, P.H.

    1985-09-01

    An experiment to evaluate the suitability of beryllium as a limiter material has been completed on the ISX-B tokamak. The experiment consisted of two phases: (1) the initial operation and characterization in the ISX experiment, and a period of continued operation to the specified surface fluence (10 22 atoms/cm 2 ) of hydrogen ions; and (2) the disassembly, decontamination, or disposal of the ISX facility. During these two phases of the project, the possibility existed for beryllium and/or beryllium oxide powder to be produced inside the vacuum vessel. Beryllium dust is a highly toxic material, and extensive precautions are required to prevent the release of the beryllium into the experimental work area and to prevent the contamination of personnel working on the device. Details of the health hazards associated with beryllium and the appropriate precautions are presented. Also described in appendixes to this report are the various operational safety requirements for the project

  6. 25 CFR 700.53 - Dwelling, replacement.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Dwelling, replacement. 700.53 Section 700.53 Indians THE... Policies and Instructions Definitions § 700.53 Dwelling, replacement. The term replacement dwelling means a dwelling selected by the head of a household as a replacement dwelling that meets the criteria of this...

  7. Could wind replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    This article aims at assessing the situation produced by a total replacement of nuclear energy by wind energy, while facing consumption demand at any moment, notably in December. The authors indicate the evolution of the French energy mix during December 2016, and the evolution of the rate between wind energy production and the sum of nuclear and wind energy production during the same month, and then give briefly some elements regarding necessary investments in wind energy to wholly replace nuclear energy. According to them, such a replacement would be ruinous

  8. Nuclear facilities: repair and replacement technologies; Installations nucleaires: technologies de reparation et de remplacement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  9. Plant process computer replacements - techniques to limit installation schedules and costs

    International Nuclear Information System (INIS)

    Baker, M.D.; Olson, J.L.

    1992-01-01

    Plant process computer systems, a standard fixture in all nuclear power plants, are used to monitor and display important plant process parameters. Scanning thousands of field sensors and alarming out-of-limit values, these computer systems are heavily relied on by control room operators. The original nuclear steam supply system (NSSS) vendor for the power plant often supplied the plant process computer. Designed using sixties and seventies technology, a plant's original process computer has been obsolete for some time. Driven by increased maintenance costs and new US Nuclear Regulatory Commission regulations such as NUREG-0737, Suppl. 1, many utilities have replaced their process computers with more modern computer systems. Given that computer systems are by their nature prone to rapid obsolescence, this replacement cycle will likely repeat. A process computer replacement project can be a significant capital expenditure and must be performed during a scheduled refueling outage. The object of the installation process is to install a working system on schedule. Experience gained by supervising several computer replacement installations has taught lessons that, if applied, will shorten the schedule and limit the risk of costly delays. Examples illustrating this technique are given. This paper and these examples deal only with the installation process and assume that the replacement computer system has been adequately designed, and development and factory tested

  10. 43 CFR 404.40 - What is the non-Federal share of operation, maintenance, and replacement costs?

    Science.gov (United States)

    2010-10-01

    ... Cost-Sharing § 404.40 What is the non-Federal share of operation, maintenance, and replacement costs? You are required to pay 100 percent of the operation, maintenance, and replacement costs of any rural... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the non-Federal share of operation...

  11. Carbohydrates as Fat Replacers.

    Science.gov (United States)

    Peng, Xingyun; Yao, Yuan

    2017-02-28

    The overconsumption of dietary fat contributes to various chronic diseases, which encourages attempts to develop and consume low-fat foods. Simple fat reduction causes quality losses that impede the acceptance of foods. Fat replacers are utilized to minimize the quality deterioration after fat reduction or removal to achieve low-calorie, low-fat claims. In this review, the forms of fats and their functions in contributing to food textural and sensory qualities are discussed in various food systems. The connections between fat reduction and quality loss are described in order to clarify the rationales of fat replacement. Carbohydrate fat replacers usually have low calorie density and provide gelling, thickening, stabilizing, and other texture-modifying properties. In this review, carbohydrates, including starches, maltodextrins, polydextrose, gums, and fibers, are discussed with regard to their interactions with other components in foods as well as their performances as fat replacers in various systems.

  12. Remote handling demonstration of ITER blanket module replacement

    International Nuclear Information System (INIS)

    Kakudate, S.; Nakahira, M.; Oka, K.; Taguchi, K.; Obara, K.; Tada, E.; Shibanuma, K.; Tesini, A.; Haange, R.; Maisonnier, D.

    2001-01-01

    In ITER, the in-vessel components such as blanket are to be maintained or replaced remotely since they will be activated by 14 MeV neutrons, and a complete exchange of shielding blanket with breeding blanket is foreseen after the Basic Performance Phase. The blanket is segmented into about seven hundred modules to facilitate remote maintainability and allow individual module replacement. For this, the remote handing equipment for blanket maintenance is required to handle a module with a dead weight of about 4 tonne within a positioning accuracy of a few mm under intense gamma radiation. According to the ITER R and D program, a rail-mounted vehicle manipulator system was developed and the basic feasibility of this system was verified through prototype testing. Following this, development of full-scale remote handling equipment has been conducted as one of the ITER Seven R and D Projects aiming at a remote handling demonstration of the ITER blanket. As a result, the Blanket Test Platform (BTP) composed of the full-scale remote handling equipment has been completed and the first integrated performance test in March 1998 has shown that the fabricate remote handling equipment satisfies the main requirements of ITER blanket maintenance. (author)

  13. [Reoperative valve replacement in patients undergoing cardiac reoperation: a report of 104 cases].

    Science.gov (United States)

    Zou, Liang-jian; Xu, Zhi-yun; Wang, Zhi-nong; Lang, Xi-long; Han, Lin; Lu, Fang-lin; Xu, Ji-bin; Tang, Hao; Ji, Guang-yu; Wang, Er-song; Wang, Jun; Qu, Yi

    2010-08-15

    To review the experience of reoperative valve replacement for 104 patients. From January 2002 to December 2009, 104 patients underwent heart valve replacement in reoperations, accounting for 2.92% of the total patient population (3557 cases) who had valve replacement during this period. In this group, 53 male and 51 female patients were included with a median age of 46 years (ranged from 13 to 72 years). The reasons of reoperation included 28 cases suffered from another valve lesion after valve replacement, 10 cases suffered from valve lesion after mitral valvuloplasty, 19 cases suffered from perivalvular leakage after valve replacement, 18 cases suffered from valve lesion after previous correction of congenital heart defect, 7 cases suffered from bioprosthetic valve decline, 10 cases suffered from prosthetic valve endocarditis, 9 cases suffered from dysfunction of machine valve, and 3 cases suffered from other causes. The re-operations were mitral and aortic valve replacement in 2 cases, mitral valve replacement in 59 cases, aortic valve replacement in 24 cases, tricuspid valve replacement in 16 cases, and Bentall's operation in 3 cases. The interval from first operation to next operation was 1 month-19 years. There were 8 early deaths from heart failure, renal failure and multiple organ failure (early mortality 7.69%). Major complications were intraoperative hemorrhage in 2 cases, re-exploration for mediastinal bleeding in 2 cases and sternotomy surgical site infection in 1 case. Complete follow-up (3 months-7 years and 2 months) was available for all patients. Two patients died, one patient died of intracranial hemorrhage, and another cause was unknown. Satisfactory short-term and long-term results can be obtained in reoperative valve replacement with appropriate timing of operation control, satisfactory myocardial protection, accurate surgical procedure and suitable perioperative treatment.

  14. Optimal replacement policy for safety-related multi-component multi-state systems

    International Nuclear Information System (INIS)

    Xu Ming; Chen Tao; Yang Xianhui

    2012-01-01

    This paper investigates replacement scheduling for non-repairable safety-related systems (SRS) with multiple components and states. The aim is to determine the cost-minimizing time for replacing SRS while meeting the required safety. Traditionally, such scheduling decisions are made without considering the interaction between the SRS and the production system under protection, the interaction being essential to formulate the expected cost to be minimized. In this paper, the SRS is represented by a non-homogeneous continuous time Markov model, and its state distribution is evaluated with the aid of the universal generating function. Moreover, a structure function of SRS with recursive property is developed to evaluate the state distribution efficiently. These methods form the basis to derive an explicit expression of the expected system cost per unit time, and to determine the optimal time to replace the SRS. The proposed methodology is demonstrated through an illustrative example.

  15. Media and Australia's replacement reactor project

    International Nuclear Information System (INIS)

    Keenan, Pamela

    2001-01-01

    In September 1997, the Commonwealth Government of Australia announced a proposal to build a replacement nuclear research reactor at Lucas Heights in Sydney. Extensive public consultation, parliamentary debate and independent reports were prepared to ensure that the new facility would meet strict international requirements, national safety and environmental standards, and performance specifications servicing the needs of Australia - for decades to come. On 6 June 2000, Argentine company INVAP SE was announced as the preferred tenderer. In July 2000 contracts were signed between INVAP and the Australian Nuclear Science and Technology Organisation for the construction the replacement reactor, due to be completed in 2005. In order to retain a strong local presence, INVAP undertook a joint venture with two of Australia's foremost heavy construction businesses. Briefly the new research reactor will be a replacement for the ageing Australian Reactor (HIFAR). Nuclear science and technology, in Australia, is no stranger to media controversy and misinformation. Understandably the announcement of a preferred tenderer followed by the signing of contracts, attracted significant national and international media attention. However in the minds of the media, the issue is far from resolved and is now a constant 'news story' in the Australian media. Baseless media stories have made claims that the project will cost double the original estimates; question the credibility of the contractors; and raise issues of international security. The project is currently linked with Australia's requirements for long term nuclear waste management and there has been an attempt to bring national Indigenous People's issues into play. Some of these issues have been profiled in the press internationally. So, just to set the record straight and give you an appropriate impression of what's 'really happening' I would like to highlight a few issues, how ANSTO dealt with these, and what was finally reported

  16. Preoperative computer tomography evaluation in transcatheter aortic valve replacement (TAVI)

    International Nuclear Information System (INIS)

    Groudeva, V.; Stoynova, V.; Trendafilova, D.; Dzhorgova, Y.; Nachev, G.

    2014-01-01

    Transcatheter aortic valve replacement is rapidly emerging technique alternative to surgery in high risk patients. Imaging and especially computer tomography is important in preoperative assessment of the aortic ring and the prosthetic valve choice. The aim of this study is to share authors initial experience in CT assessment of the aortic ring prior to Transcatheter aortic valve replacement. 49 patients (mean age 76,55) underwent 320 rows MDCT (Acquilon One) prior TAVI. Protocol involved scanning from thoracic inlet to common femoral arteries. Aortic root size, aortic diameter at the level of coronary sinuses and the sinotubular junction and distance to coronary ostia were evaluated on a Vitrea work station. MDCT established maximal aortic ring diameter from 18 to 31 mm mean 25,04 mm while the lesser rate was from 16 to 21 mm. Accordingly positioned prostheses were in 34,75% No. 23, in 49% - No. 26 and in16,3% - No. 29. MDCT is crucial in aortic valve assessment prior to TAVI in experienced hands and multidisciplinary team. (authors) Key words: TRANSCATHETER AORTIC VALVE REPLACEMENT (TAVI). MDCT AORTIC VALVE ASSESSMENT

  17. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  18. Can photovoltaic replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    As the French law on energy transition for a green growth predicts that one third of nuclear energy production is to be replaced by renewable energies (wind and solar) by 2025, and while the ADEME proposes a 100 per cent renewable scenario for 2050, this paper proposes a brief analysis of the replacement of nuclear energy by solar photovoltaic energy. It presents and discusses some characteristics of photovoltaic production: production level during a typical day for each month (a noticeable lower production in December), evolution of monthly production during a year, evolution of the rate between nuclear and photovoltaic production. A cost assessment is then proposed for energy storage and for energy production, and a minimum cost of replacement of nuclear by photovoltaic is assessed. The seasonal effect is outlined, as well as the latitude effect. Finally, the authors outline the huge cost of such a replacement, and consider that public support to new photovoltaic installations without an at least daily storage mean should be cancelled

  19. Dislocation of total hip replacement in patients with fractures of the femoral neck.

    Science.gov (United States)

    Enocson, Anders; Hedbeck, Carl-Johan; Tidermark, Jan; Pettersson, Hans; Ponzer, Sari; Lapidus, Lasse J

    2009-04-01

    Total hip replacement is increasingly used in active, relatively healthy elderly patients with fractures of the femoral neck. Dislocation of the prosthesis is a severe complication, and there is still controversy regarding the optimal surgical approach and its influence on stability. We analyzed factors influencing the stability of the total hip replacement, paying special attention to the surgical approach. We included 713 consecutive hips in a series of 698 patients (573 females) who had undergone a primary total hip replacement (n = 311) for a non-pathological, displaced femoral neck fracture (Garden III or IV) or a secondary total hip replacement (n = 402) due to a fracture-healing complication after a femoral neck fracture. We used Cox regression to evaluate factors associated with prosthetic dislocation after the operation. Age, sex, indication for surgery, the surgeon's experience, femoral head size, and surgical approach were tested as independent factors in the model. The overall dislocation rate was 6%. The anterolateral surgical approach was associated with a lower risk of dislocation than the posterolateral approach with or without posterior repair (2%, 12%, and 14%, respectively (p replacement in patients with femoral neck fractures.

  20. Salivary cortisol day curves in assessing glucocorticoid replacement therapy in Addison's disease

    NARCIS (Netherlands)

    Smans, L.; Lentjes, E.G.W.M.; Hermus, A.R.; Zelissen, P.M.J.

    2013-01-01

    OBJECTIVE: Patients with Addison's disease require lifelong treatment with glucocorticoids. At present, no glucocorticoid replacement therapy (GRT) can exactly mimic normal physiology. As a consequence, under- and especially overtreatment can occur. Suboptimal GRT may lead to various side effects.

  1. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  2. Design for the magnetic field requirements of the tandem mirror experiment

    International Nuclear Information System (INIS)

    Chen, F.K.; Chargin, A.K.; Denhoy, B.S.; Waugh, A.F.

    1977-01-01

    The tandem mirror magnetic geometry is described, followed by an analysis of the magnet set designed to meet the requirements of the TMX experiment. The final magnet line-up is composed of a baseball coil with two C coils for each plug, six solenoidal coils for the central cell, and two RC coils plus one octupole coil for each transition

  3. Study on concrete with partial replacement of cement by rice husk ash

    Science.gov (United States)

    Kaarthik Krishna, N.; Sandeep, S.; Mini, K. M.

    2016-09-01

    Increase in the demand of conventional construction materials and the need for providing a sustainable growth in the construction field has prompted the designers and developers to opt for ‘alternative materials’ feasible for use in construction. For this objective, the use of industrial waste products and agricultural byproducts are very constructive. These industrial wastes and agricultural by products such as Fly Ash, Rice Husk Ash, Silica Fume, and Slag can be replaced instead of cement because of their pozzolanic behavior, which otherwise requires large tract of lands for dumping. In the present investigation, Rice Husk Ash has been used as an admixture to cement in concrete and its properties has been studied. An attempt was also done to examine the strength and workability parameters of concrete. For normal concrete, mix design is done based on Indian Standard (IS) method and taking this as reference, mix design has been made for replacement of Rice Husk Ash. Four different replacement levels namely 5%, 10%, 15% and 20% are selected and studied with respect to the replacement method.

  4. Framatome experience in fuel assembly repair and reconstitution

    International Nuclear Information System (INIS)

    Leroy, G.

    1998-01-01

    Since 1985, FRAMATOME has build up extensive experience in the poolside replacement of fuel rods for repair or R and D purposes and the reconstitution of fuel assemblies (i.e. replacement of a damaged structure to enable reuse of the fuel rod bundle). This experience feedback enables FRAMATOME to improve in steps the technical process and the equipment used for the above operations in order to enhance their performance in terms of setup, flexibility, operating time and safety. In parallel, the fuel assembly and fuel rod designs have been modified to meet the same goals. The paper will describe: - the overall experience of FRAMATOME with UO 2 fuel as well as MOX fuel; the usual technical process used for fuel replacement and the corresponding equipment set; - the usual technical process for fuel assembly reconstitution and the corresponding equipment set. This process is rather unique since it takes profit of the specific FRAMATOME fuel assembly design with removable top and bottom nozzles, so that fuel rods insertion by pulling through in the new structure is similar to what is done in the manufacturing plant; - the usual inspections done on the fuel rods and/or the fuel assembly; - the design of the new reconstitution equipment (STAR) compared with the previous one as well as their comparative performance. The final section will be a description of the alternative reconstitution process and equipment used by FRAMATOME in reactors in which the process cannot be used for several reasons such as compatibility or administrative authorization. This process involves the pushing of fuel rods into the new structure, requiring further precautions. (author)

  5. Delirium After Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Giuseffi, Jennifer L; Borges, Nyal E; Boehm, Leanne M; Wang, Li; McPherson, John A; Fredi, Joseph L; Ahmad, Rashid M; Ely, E Wesley; Pandharipande, Pratik P

    2017-07-01

    Postoperative delirium is associated with increased mortality. Patients undergoing transcatheter aortic valve replacement are at risk for delirium because of comorbid conditions. To compare the incidence, odds, and mortality implications of delirium between patients undergoing transcatheter replacement and patients undergoing surgical replacement. The Richmond Agitation-Sedation Scale and the Confusion Assessment Method for the Intensive Care Unit were used to assess arousal level and delirium prospectively in all patients with severe aortic stenosis who had transcatheter or surgical aortic valve replacement at an academic medical center. Multivariable logistic regression was used to determine the relationship between procedure type and occurrence of delirium. Cox regression was used to assess the association between postoperative delirium and 6-month mortality. A total of 105 patients had transcatheter replacement and 121 had surgical replacement. Patients in the transcatheter group were older (median age, 81 vs 68 years; P replacement. Delirium is less likely to develop in the transcatheter group but is associated with higher mortality in both groups. ©2017 American Association of Critical-Care Nurses.

  6. Replacement of raw soybean with roasted soybean increased milk production in Holstein cows

    Directory of Open Access Journals (Sweden)

    Gilson Sebastião Dias Júnior

    Full Text Available ABSTRACT: The aim of this study was to evaluate the effect of total replacement of raw whole soybean (RAW for roastedwhole soybean (ROS on the production performance of Holstein cows. Two experiments were carried out usinga simple reversal design where RAW has been completely replaced by ROS. In experiment 1, 22 cows (175±60 days in milkwere used, and the dietary inclusion level of RAW or ROS was 3.7% of dry matter (DM. In experiment 2, 16 cows (130±50 days in milkwere used, and thedietary inclusion level of RAW or ROS was 11% of DM. In both experiments, ROS increased milk production by 1.1kgday-1 without changing fat and protein production. Dry matter intake or milk urea nitrogenwere not affected by dietary soy source. In experiment 2, plasma glucose concentration was decreased, and allantoin/creatinine ratio in urine tended to decreasein ROS. Experiment 2 also evaluated the nutrient digestibility and ruminal degradation kinetics of crude protein in two soybean sources. Roasting had no effect on the digestibility of DM, organic matter, and neutral detergent fiber. Roasted whole soybean hadgreater fraction B and lower protein degradation rate than did RAW; this showed that heat treatment was effective in increasing therumen undegradable amino acid flowto the animal, which suggesteda potential mechanism of action for improved performance observed in ROS.

  7. The construction of emotional experience requires the integration of implicit and explicit emotional processes.

    Science.gov (United States)

    Quirin, Markus; Lane, Richard D

    2012-06-01

    Although we agree that a constructivist approach to emotional experience makes sense, we propose that implicit (visceromotor and somatomotor) emotional processes are dissociable from explicit (attention and reflection) emotional processes, and that the conscious experience of emotion requires an integration of the two. Assessments of implicit emotion and emotional awareness can be helpful in the neuroscientific investigation of emotion.

  8. Feeder replacement tooling and processes

    International Nuclear Information System (INIS)

    Mallozzi, R.; Goslin, R.; Pink, D.; Askari, A.

    2008-01-01

    Primary heat transport system feeder integrity has become a concern at some CANDU nuclear plants as a result of thinning caused by flow accelerated corrosion (FAC). Feeder inspections are indicating that life-limiting wall thinning can occur in the region between the Grayloc hub weld and second elbow of some outlet feeders. In some cases it has become necessary to replace thinned sections of affected feeders to restore feeder integrity to planned end of life. Atomic Energy of Canada Limited (AECL) and Babcock and Wilcox Canada Ltd. (B and W) have developed a new capability for replacement of single feeders at any location on the reactor face without impacting or interrupting operation of neighbouring feeders. This new capability consists of deploying trained crews with specialized tools and procedures for feeder replacements during planned outages. As may be expected, performing single feeder replacement in the congested working environment of an operational CANDU reactor face involves overcoming many challenges with respect to access to feeders, available clearances for tooling, and tooling operation and performance. This paper describes some of the challenges encountered during single feeder replacements and actions being taken by AECL and B and W to promote continuous improvement of feeder replacement tooling and processes and ensure well-executed outages. (author)

  9. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  10. The influence of solution composition and grain boundaries on the replacement of calcite by dolomite

    Science.gov (United States)

    Moraila Martinez, Teresita de Jesus; Putnis, Christine V.; Putnis, Andrew

    2016-04-01

    Dolomite formation is a mineral replacement reaction that affects extensive rock volumes and comprises a large fraction of oil and gas reservoirs [1,2]. The most accepted hypothesis is the 'dolomitization' of limestone by Mg-rich fluids [3]. The objective of this research is to study the replacement mechanism of calcite by dolomite, the role of grain boundaries, highlighted by Etschmann et al. (2014), and the possible influence of solutions in dolomite formation under the presence of ions that are normally in crustal aqueous fluids. To accomplish this purpose, we performed hydrothermal experiments using Carrara marble cubes of ~1.5 mm size and 7-9 mg weight as starting material, reacted with 1M (Mg,Ca)Cl2 aqueous solutions, with Mg/Ca ratios of 3 and 5 at 200°C, for different reaction times. Additional experiments were performed adding 1mM of Na2SO4, NaCl or NaF to the previous solutions. After the reaction, the product phases were identified using Raman spectroscopy, X-Ray powder diffraction (XRD), electron microprobe analysis (EMPA), and the textural evolution was studied by scanning electron microscopy (SEM). Samples reacted with aqueous solutions resulted in the replacements of the calcite rock into magnesite and dolomite. The amount and type of reaction strongly depends on the Mg/Ca ratio. Samples reacted with a Mg/Ca ratio of 5 resulted in an almost complete replacement reaction and more favorable for magnesite formation than for dolomite. When the Mg/Ca ratio was 3 dolomite formed but the replacement was located in the core of the sample. We show that grain boundaries are very important for the infiltration of solution and the progress of a replacement reaction, acting as fluid pathways. Solution composition controls the nature of the replacement product. Acknowledgment: This work is funded within a Marie Curie EU Initial Training Network- CO2-React. 1. Etschmann B., Brugger J., Pearce M.A., Ta C., Brautigan D., Jung M., Pring A. (2014). Grain boundaries as

  11. Counseling patients on facial volume replacement and adherence with posttreatment instructions

    Directory of Open Access Journals (Sweden)

    Doris Day

    2010-07-01

    Full Text Available Doris DayDay Dermatology and Aesthetics New York, USAAbstract: Use of injectable volume replacement products has increased dramatically in the US in recent years. An optimal outcome with volume replacement depends on a thorough ­knowledge of the products on the part of the dermatologic/aesthetic physician specialist, identification of patients with a likelihood of benefiting from volume replacement procedures, selection of an appropriate product for the individual patient, and effective patient counseling to ensure adherence to posttreatment care instructions. Adherence to physician instructions in the field of dermatology appears limited, and there is very little published information on adherence to physician instructions following facial volume replacement procedures. The purpose of this review is to provide strategies for understanding and overcoming the barriers to adherence with the widely used dermal fillers. Strategies include using patient-centered techniques, such as a motivational interview encouraging the patient to follow postprocedure care instructions, eg, massage. In this case, demonstrating massage techniques while the patient is still in the office, with patient participation and detailed feedback, also contributes to good adherence with posttreatment care instructions. Telephone counseling, reminder postcards, and text messages may help improve clinic attendance for follow-up. Motivated patients who demonstrate good ­adherence to physician instructions generally respond well to volume replacement treatments, and usually experience fewer adverse events than patients who do not follow instructions. Although promoting adherence to pretreatment and posttreatment protocols remains a challenge, patient counseling throughout the treatment process can lead to successful results.Keywords: improving adherence, injectable volume replacement, product selection, ­rejuvenation procedure, soft tissue augmentation

  12. Refurbishment and replacement efforts to mitigate ageing at Tarapur Atomic Power Station - an overview

    International Nuclear Information System (INIS)

    Katiyar, S.C.; Thattey, V.; Das, P.K.

    2006-01-01

    Tarapur Atomic Power Station (TAPS) - a twin Boiling Water Reactor unit and India's first Atomic Power Station was commissioned in April 1969, and was declared commercial in November 1969. Since then the light water moderated, low enriched uranium BWR with its demonstrated reliability and favourable economics is playing a vital role as a reliable source of power for the states of Maharashtra and Gujarat. The Power Station played a key role as a technology demonstrator validating the nuclear energy as safe and environmentally benign and economically viable alternate source of power generation in India. Built in the late sixties with state-of-the-art safety features prevailing then, TAPS has further evolved to be a safe plant with renovation and refurbishment efforts. Ageing Management Programme is in place at TAPS. Identification of systems, structures and components (SSCs) important to safety and availability, assessment of ageing degradation of these SSCs and mitigation through repair, replacement and refurbishment based on the investigations have enhanced the plant safety and reliability. The station's operating experience and feedback from BWRs operating abroad have also given inputs to Ageing Management Programme. A good number of major equipment have been replaced to mitigate ageing. Primary system piping, process heat exchangers, feed water heaters, turbine extraction system piping, turbine blades, emergency condenser tube bundles, various pumps, station batteries, electrical cables, circuit breakers etc. are some of them. Obsolescence is another aspect of ageing of a plant. Replacement of obsolete equipment and components particularly in C and I is another area where much headway has been made. Replacement and refurbishment of equipment have been done after detailed study and analysis so that current standards are met. Retrofitting the indigenously developed and fabricated equipment in a compact plant like TAPS was a difficult task and required lot of

  13. Selective Heart, Brain and Body Perfusion in Open Aortic Arch Replacement.

    Science.gov (United States)

    Maier, Sven; Kari, Fabian; Rylski, Bartosz; Siepe, Matthias; Benk, Christoph; Beyersdorf, Friedhelm

    2016-09-01

    Open aortic arch replacement is a complex and challenging procedure, especially in post dissection aneurysms and in redo procedures after previous surgery of the ascending aorta or aortic root. We report our experience with the simultaneous selective perfusion of heart, brain, and remaining body to ensure optimal perfusion and to minimize perfusion-related risks during these procedures. We used a specially configured heart-lung machine with a centrifugal pump as arterial pump and an additional roller pump for the selective cerebral perfusion. Initial arterial cannulation is achieved via femoral artery or right axillary artery. After lower body circulatory arrest and selective antegrade cerebral perfusion for the distal arch anastomosis, we started selective lower body perfusion simultaneously to the selective antegrade cerebral perfusion and heart perfusion. Eighteen patients were successfully treated with this perfusion strategy from October 2012 to November 2015. No complications related to the heart-lung machine and the cannulation occurred during the procedures. Mean cardiopulmonary bypass time was 239 ± 33 minutes, the simultaneous selective perfusion of brain, heart, and remaining body lasted 55 ± 23 minutes. One patient suffered temporary neurological deficit that resolved completely during intensive care unit stay. No patient experienced a permanent neurological deficit or end-organ dysfunction. These high-risk procedures require a concept with a special setup of the heart-lung machine. Our perfusion strategy for aortic arch replacement ensures a selective perfusion of heart, brain, and lower body during this complex procedure and we observed excellent outcomes in this small series. This perfusion strategy is also applicable for redo procedures.

  14. Reimplantation valve-sparing aortic root replacement in Marfan syndrome using the Valsalva conduit: an intercontinental multicenter study.

    Science.gov (United States)

    Settepani, Fabrizio; Szeto, Wilson Y; Pacini, Davide; De Paulis, Ruggero; Chiariello, Luigi; Di Bartolomeo, Roberto; Gallotti, Roberto; Bavaria, Joseph E

    2007-02-01

    Introduced by DePaulis in 2000, the Gelweave Valsalva graft (Sulzer Vascutek, Refrewshire, Scotland) is a modified Dacron conduit (DuPont, Wilmington, DE), with prefashioned sinuses of Valsalva. The aim of this study was to evaluate the mid-term results of the reimplantation valve-sparing aortic root replacement using the Gelweave Valsalva prosthesis in Marfan syndrome patients. A retrospective review was performed of 35 patients with Marfan syndrome in four centers who underwent the reimplantation valve-sparing aortic root replacement using the Gelweave Valsalva prosthesis. The patients were predominantly men, with a mean age of 36.5 +/- 12.6 years (range, 14 to 62 years). Two patients presented with acute type A dissections and underwent emergent operations. Elective hemiarch reconstruction using hypothermic circulatory arrest was required in 11 patients. Aortic valve cusp repair was performed in 2 patients. There were no operative or hospital deaths, and no patients died during follow-up. The mean follow-up was 19 months (range, 1 to 60 months). Significant (>2+) aortic insufficiency (AI), requiring aortic valve replacement, developed in 3 patients during follow-up that requiring aortic valve replacement. The 5-year freedom from reoperation owing to structural valve deterioration was 88.9% +/- 8.1%. There were no episodes of clinically significant thromboembolism. Reimplantation valve-sparing aortic root replacement with the Gelweave Valsalva prosthesis in Marfan patients provides satisfactory mid-term results, thus encouraging further use of this type of repair. However, long-term results are needed in order to define the durability of this technique.

  15. Diagenetic replacement of Micas by Carbonates

    NARCIS (Netherlands)

    Oele, E.

    1961-01-01

    In the Ordovician sandstones of the Cantabrian Mountains a replacement of the micas by carbonate minerals could be observed. The absence of metamorphic minerals suggests a diagenetic replacement. This is supported by the finding of the same type of replacement in some undisturbed Pliocene sediments

  16. 24 CFR 891.605 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.605... 8 Assistance § 891.605 Replacement reserve. (a) Establishment of reserve. The Borrower shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance, and repair and...

  17. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  18. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Wiechmann, K.

    1993-01-01

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.) [de

  19. Proceedings of the NEA/CSNI-UNIPEDE Specialist Meeting on Operating Experience with Steam Generators

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-07-01

    The long history of operating experience with pressurized water reactors has indicated that the steam generators are of primary importance in nuclear power plant design and operation; this is furthermore confirmed by analyzing the data of the Incident Reporting System (IRS). It is for this reason that the OECD/NEA Committee on the Safety of Nuclear Installations organizes, in cooperation with UNIPEDE, a Specialist Meeting on 'Operating Experience with Steam Generators'. This Specialist Meeting, held in Brussels, Belgium, in September 1991, is hosted by the Belgian Government and AIB-Vincotte Nuclear. In addition to being a follow-up to the October 1984 meeting (organized by the CSNI and UNIPEDE in Stockholm, Sweden), this Meeting reviews the current state-of-the-art of steam generator technology thus providing a forum for the exchange of related experience in operation, inspection, maintenance, repair, modifications, replacement, and licensing requirements pertaining to steam generators. Forty-seven papers are presented in eight sessions entitled: Operating Experience (two sessions), Structural Integrity and Licensing Issues, Analysis and Prediction of Degradation Mechanisms, Inservice Inspection Methods, Preventive and Corrective Actions (two sessions) and Replacement of Steam Generators. There are furthermore two panel sessions entitled 'Observed Degradation Mechanisms and Licensing Positions', and 'Inspection, Repair and Replacement Strategies'. These proceedings consist of a compilation of the papers presented at the Meeting, which is attended by more than one hundred and fifty participants from fifteen countries and several international organisations.

  20. Deficits in latent inhibition induced by estradiol replacement are ameliorated by haloperidol treatment

    Directory of Open Access Journals (Sweden)

    Anne eAlmey

    2013-10-01

    Full Text Available There are sex differences in the symptomatology of schizophrenia, and in the response to antipsychotic treatments. One hallmark symptom of schizophrenia is a deficit in selective attention. Selective attention can be measured using a latent inhibition (LI paradigm in humans; LI can be measured in rodents, and is used as an animal model of the selective attention deficits observed in schizophrenia. In the current experiments LI was used to clarify whether selective attention differs between male rats and ovariectomized (OVX female rats receiving different estradiol (E2 replacement regimens. An additional aim was to determine whether haloperidol's facilitation of LI is enhanced by E2. Males and OVX female rats were trained in a conditioned emotional response LI paradigm. Females received no E2 replacement, a chronic low dose of E2 via silastic capsule, or a high phasic dose of E2 via silastic capsule accompanied by E2 (10 ug/kg SC injections every fourth day. Actual plasma levels of E2 were determined using an enzyme linked immunosorbent assay. Rats were also administered a vehicle treatment, a 0.05mg/kg, or a 0.1mg/kg IP injection of haloperidol. Males and OVX females that did not receive E2 replacement both exhibited LI, but LI was not observed in the low and high E2 replacement groups. Haloperidol restored LI at a lower dose in the females receiving high E2 replacement compared to females receiving low E2 replacement, indicating that E2 replacement facilitates haloperidol in restoring LI.

  1. Self-supporting method; an alternative method for steel truss bridge element replacement

    Science.gov (United States)

    Arsyad, Muhammad; Sangadji, Senot; As'ad, Sholihin

    2017-11-01

    Steel truss bridge often requires replacement of its element due to serious damage caused by traffic accidents. This replacement is carried out using temporary supporting structure. It would be difficult when the available space for the temporary structure is quite limited and or the position of work is at a high elevation. The self-supporting method is proposed instead of temporary supporting structure. This paper will discuss an innovative method of bridge rehabilitation by utilizing the existing bridge structure. It requires such temporary connecting structure that installed on the existing bridge element, therefore, the forces during replacement process could be transferred to the bridge foundation directly. By taking the case on a steel truss bridge Jetis Salatiga which requires element replacement due to its damages on two main diagonals, a modeling is carried out to get a proper repair method. Structural analysis is conducted for three temporary connecting structure models: “I,” “V,” and triangular model. Stresses and translations that occur in the structure are used as constraints. Bridge bearings are modeled in two different modes: fixed-fixed system and fixed-free one. Temperature load is given in each condition to obtain the appropriate time for execution. The triangular model is chosen as the best one. In the fixed-fixed mode, this method can be carried out in a temperature range 27-28.8° C, while in fixed-free one, the temperature it is allowed between 27-43.4 °C. The D4 is dismantled first by cutting the D4 leaving an area of 1140.2 mm2 or 127 mm web length to enable plastic condition until the D4 collapses. At the beginning of elongation occurs, immediately performed a slowly jacking on a temporary connecting structure so that the force on D4 is gradually transferred to the temporary connecting structure then the D4 and D5 are set in their place.

  2. Long-Acting Morphine Following Hip or Knee Replacement: A Randomized, Double-Blind, Placebo-Controlled Trial

    Directory of Open Access Journals (Sweden)

    Shirley L Musclow

    2012-01-01

    Full Text Available BACKGROUND: Patients undergoing total hip or knee replacement surgery experience unmanaged pain during postoperative physiotherapy sessions. It was theorized that a baseline opioid would improve pain management.

  3. Fish condensate as effective replacer of fish meal protein in diet for striped snakehead, Channa striata (Bloch).

    Science.gov (United States)

    Wattanakul, Wattana; Wattanakul, Uraiwan; Thongprajukaew, Karun; Muenpo, Chutchawan

    2017-02-01

    The optimal protein replacement of fish meal (FM) by fish condensate (FC) was investigated in striped snakehead, Channa striata (Bloch) (1.78 ± 0.02 g initial weight). The FM-based diet (0FC) was replaced by substituting protein from FC for 100 (100FC), 200 (200FC), 300 (300FC), 400 (400FC), 500 (500FC) or 600 (600FC) g kg -1 of the FM, and a commercial diet (CD) for carnivorous fish was included for comparison. The experiment was conducted indoors under completely randomized design (8 treatments × 3 replications × 60 fish per pond) over a 6-month trial. There were no significant differences in water quality during the experiment. The fish fed with 500FC had superior growth performance and feed utilization. This dietary treatment gave similar levels to all observed specific activities of digestive enzymes as did baseline 0FC. Survival, carcass composition, hematological parameters and liver histopathology were not negatively impacted by this protein replacement level. Economic analysis also supports the use of this by-product as a potent protein replacer in striped snakehead diet. Findings from the current study indicate that a 500 g kg -1 protein replacement of FM by FC is near optimal for striped snakehead, and similar use of it in the aquafeed of other species appears worth further studies.

  4. Computational Experiments for Science and Engineering Education

    Science.gov (United States)

    Xie, Charles

    2011-01-01

    How to integrate simulation-based engineering and science (SBES) into the science curriculum smoothly is a challenging question. For the importance of SBES to be appreciated, the core value of simulations-that they help people understand natural phenomena and solve engineering problems-must be taught. A strategy to achieve this goal is to introduce computational experiments to the science curriculum to replace or supplement textbook illustrations and exercises and to complement or frame hands-on or wet lab experiments. In this way, students will have an opportunity to learn about SBES without compromising other learning goals required by the standards and teachers will welcome these tools as they strengthen what they are already teaching. This paper demonstrates this idea using a number of examples in physics, chemistry, and engineering. These exemplary computational experiments show that it is possible to create a curriculum that is both deeper and wider.

  5. Long-life slab replacement concrete.

    Science.gov (United States)

    2015-03-01

    This research was initiated following reports of high incidence of cracking on FDOT concrete pavement replacement : slab projects. Field slabs were instrumented for data acquisition from high-early-strength concrete pavement : replacement slabs place...

  6. Renal Replacement Therapy Modality in the ICU and Renal Recovery at Hospital Discharge.

    Science.gov (United States)

    Bonnassieux, Martin; Duclos, Antoine; Schneider, Antoine G; Schmidt, Aurélie; Bénard, Stève; Cancalon, Charlotte; Joannes-Boyau, Olivier; Ichai, Carole; Constantin, Jean-Michel; Lefrant, Jean-Yves; Kellum, John A; Rimmelé, Thomas

    2018-02-01

    Acute kidney injury requiring renal replacement therapy is a major concern in ICUs. Initial renal replacement therapy modality, continuous renal replacement therapy or intermittent hemodialysis, may impact renal recovery. The aim of this study was to assess the influence of initial renal replacement therapy modality on renal recovery at hospital discharge. Retrospective cohort study of all ICU stays from January 1, 2010, to December 31, 2013, with a "renal replacement therapy for acute kidney injury" code using the French hospital discharge database. Two hundred ninety-one ICUs in France. A total of 1,031,120 stays: 58,635 with renal replacement therapy for acute kidney injury and 25,750 included in the main analysis. None. PPatients alive at hospital discharge were grouped according to initial modality (continuous renal replacement therapy or intermittent hemodialysis) and included in the main analysis to identify predictors of renal recovery. Renal recovery was defined as greater than 3 days without renal replacement therapy before hospital discharge. The main analysis was a hierarchical logistic regression analysis including patient demographics, comorbidities, and severity variables, as well as center characteristics. Three sensitivity analyses were performed. Overall mortality was 56.1%, and overall renal recovery was 86.2%. Intermittent hemodialysis was associated with a lower likelihood of recovery at hospital discharge; odds ratio, 0.910 (95% CI, 0.834-0.992) p value equals to 0.0327. Results were consistent across all sensitivity analyses with odds/hazards ratios ranging from 0.883 to 0.958. In this large retrospective study, intermittent hemodialysis as an initial modality was associated with lower renal recovery at hospital discharge among patients with acute kidney injury, although the difference seems somewhat clinically limited.

  7. Time accuracy requirements for fusion experiments: A case study at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Raupp, Gerhard; Behler, Karl; Eixenberger, Horst; Fitzek, Michael; Kollotzek, Horst; Lohs, Andreas; Lueddecke, Klaus; Mueller, Peter; Merkel, Roland; Neu, Gregor; Schacht, Joerg; Schramm, Gerold; Treutterer, Wolfgang; Zasche, Dieter; Zehetbauer, Thomas

    2010-01-01

    To manage and operate a fusion device and measure meaningful data an accurate and stable time is needed. As a benchmark, we suggest to consider time accuracy as sufficient if it is better than typical data errors or process timescales. This allows to distinguish application domains and chose appropriate time distribution methods. For ASDEX Upgrade a standard NTP method provides Unix time for project and operation management tasks, and a dedicated time system generates and distributes a precise experiment time for physics applications. Applying the benchmark to ASDEX Upgrade shows that physics measurements tagged with experiment time meet the requirements, while correlation of NTP tagged operation data with physics data tagged with experiment time remains problematic. Closer coupling of the two initially free running time systems with daily re-sets was an efficient and satisfactory improvement. For ultimate accuracy and seamless integration, however, continuous adjustment of the experiment time clock frequency to NTP is needed, within frequency variation limits given by the benchmark.

  8. Nuclear reactor fuel replacement system

    International Nuclear Information System (INIS)

    Kayano, Hiroyuki; Joge, Toshio.

    1976-01-01

    Object: To permit the direction in which a fuel replacement unit is moving to be monitored by the operator. Structure: When a fuel replacement unit approaches an intermediate goal position preset in the path of movement, renewal of data display on a goal position indicator is made every time the goal position is changed. With this renewal, the prevailing direction of movement of the fuel replacement unit can be monitored by the operator. When the control of movement is initiated, the co-ordinates of the intermediate goal point A are displayed on a goal position indicator. When the replacement unit reaches point A, the co-ordinates of the next intermediate point B are displayed, and upon reaching point B the co-ordinates of the (last) goal point C are displayed. (Nakamura, S.)

  9. 24 CFR 970.31 - Replacement units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement units. 970.31 Section... PUBLIC HOUSING PROGRAM-DEMOLITION OR DISPOSITION OF PUBLIC HOUSING PROJECTS § 970.31 Replacement units. Notwithstanding any other provision of law, replacement public housing units may be built on the original public...

  10. Hearing the way: requirements and preferences for technology-supported navigation aids.

    Science.gov (United States)

    Lewis, Laura; Sharples, Sarah; Chandler, Ed; Worsfold, John

    2015-05-01

    Many systems have been developed to assist wayfinding for people with sight problems. There is a need for user requirements for such systems to be defined. This paper presents a study which aimed to determine such user requirements. An experiment was also conducted to establish the best way of guiding users between locations. The focus group results indicated that users require systems to provide them with information about their surroundings, to guide them along their route and to provide progress information. They also showed that users with sight conditions interact with systems differently to sighted users, thereby highlighting the importance of designing systems for the needs of these users. Results of the experiment found that the preferred method of guiding users was a notification when they were both on and off track. However, performance was best when only provided with the off track notification, implying that this cue is particularly important. Technology has the potential to support navigation for people with sight problems. Users should have control over cues provided and for these cues should supplement environmental cues rather than replacing them. Copyright © 2015. Published by Elsevier Ltd.

  11. 31 CFR 361.8 - Claim for replacement.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Claim for replacement. 361.8 Section... § 361.8 Claim for replacement. Claim for replacement shall be made in writing to the Secretary, to the..., Parkersburg, WV 26106-1328. The claim, accompanied by a recommendation regarding the manner of replacement...

  12. Hemiarch versus total aortic arch replacement in acute type A dissection: a systematic review and meta-analysis.

    Science.gov (United States)

    Poon, Shi Sum; Theologou, Thomas; Harrington, Deborah; Kuduvalli, Manoj; Oo, Aung; Field, Mark

    2016-05-01

    differences in longer term outcome data are required. We do not, however, advocate total arch as a primary approach by all centers and surgeons irrespective of patient characteristics, but rather, a tailored approach based on surgeon and center experience and patient presentation.

  13. The C-RORC PCIe Card and its Application in the ALICE and ATLAS Experiments

    CERN Document Server

    Engel, H; Costa, F; Crone, G J; Eschweiler, D; Francis, D; Green, B; Joos, M; Kebschull, U; Kiss, T; Kugel, A; Panduro Vasquez, J G; Soos, C; Teixeira-Dias, P; Tremblet, L; Vande Vyvre, P; Vandelli, W; Vermeulen, J C; Werner, P; Wickens, F J

    2015-01-01

    The ALICE and ATLAS DAQ systems read out detector data via point-to-point serial links into custom hardware modules, the ALICE RORC and ATLAS ROBIN. To meet the increase in operational requirements both experiments are replacing their respective modules with a new common module, the C-RORC. This card, developed by ALICE, implements a PCIe Gen 2 x8 interface and interfaces to twelve optical links via three QSFP transceivers. This paper presents the design of the C-RORC, its performance and its application in the ALICE and ATLAS experiments.

  14. Effect of growth hormone replacement therapy on pituitary hormone secretion and hormone replacement therapies in GHD adults

    DEFF Research Database (Denmark)

    Hubina, Erika; Mersebach, Henriette; Rasmussen, Ase Krogh

    2004-01-01

    We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes.......We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes....

  15. Molecular replacement then and now

    International Nuclear Information System (INIS)

    Scapin, Giovanna

    2013-01-01

    A brief overview, with examples, of the evolution of molecular-replacement methods and models over the past few years is presented. The ‘phase problem’ in crystallography results from the inability to directly measure the phases of individual diffracted X-ray waves. While intensities are directly measured during data collection, phases must be obtained by other means. Several phasing methods are available (MIR, SAR, MAD, SAD and MR) and they all rely on the premise that phase information can be obtained if the positions of marker atoms in the unknown crystal structure are known. This paper is dedicated to the most popular phasing method, molecular replacement (MR), and represents a personal overview of the development, use and requirements of the methodology. The first description of noncrystallographic symmetry as a tool for structure determination was explained by Rossmann and Blow [Rossmann & Blow (1962 ▶), Acta Cryst.15, 24–31]. The term ‘molecular replacement’ was introduced as the name of a book in which the early papers were collected and briefly reviewed [Rossmann (1972 ▶), The Molecular Replacement Method. New York: Gordon & Breach]. Several programs have evolved from the original concept to allow faster and more sophisticated searches, including six-dimensional searches and brute-force approaches. While careful selection of the resolution range for the search and the quality of the data will greatly influence the outcome, the correct choice of the search model is probably still the main criterion to guarantee success in solving a structure using MR. Two of the main parameters used to define the ‘best’ search model are sequence identity (25% or more) and structural similarity. Another parameter that may often be undervalued is the quality of the probe: there is clearly a relationship between the quality and the correctness of the chosen probe and its usefulness as a search model. Efforts should be made by all structural biologists to

  16. Double Valve Replacement (Mitral and Aortic for Rheumatic Heart Disease: A 20-year experience with 300 patients.

    Directory of Open Access Journals (Sweden)

    Prashant Mishra

    2016-09-01

    Full Text Available Introduction: Rheumatic heart disease still remains one of the leading causes of congestive heart failure and death owing to valvular pathologies, in developing countries. Valve replacement still remains the treatment of choice in such patients.The aim of this study wasto analyze the postoperative outcome of  double valve replacement (Mitral and Aortic in patients of rheumatic heart disease. Materials and Methods: Between 1988 and 2008, 300 patients of rheumatic heart disease underwent double (Mitral and Aortic valve replacement with Starr Edwards valve or St Jude mechanical valve prosthesis were implanted. These patients were studied retrospectively for preoperative data and postoperative outcome including causes of early and late deaths and the data was analyzed statistically. Results: The 30-day hospital death rate was 11.3% andlate death occurred in 11.6%. Anticoagulant regimen was followed to maintain the target pro-thrombin time at 1.5 times the control value. The actuarial survival (exclusive of hospital mortality was 92.4%, 84.6%, and 84.4%, per year at 5, 10, and 20 years, respectively Conclusions: In view of the acknowledged advantageof superior durability, increased thromboresistance in our patient population, and its cost effectiveness the Starr-Edwards ball valve or St. Jude valve is the mechanical prosthesis of choice for advanced combined valvular disease. The low-intensity anticoagulant regimen has offered suffcient protection against thromboembolism as well as hemorrhage.

  17. Finnish experiences on licensing and using of programmable digital systems in nuclear power plants

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.; Heimburger, H.; Hall, L.E.; Manninen, T.

    1993-01-01

    Finnish utility companies, Imatran Voima Oy (IVO) and Teollisuuden Voima (TVO), and the licensing authority, the Finnish Centre for Radiation and Nuclear Safety (STUK), are preparing for a new nuclear power plant in Finland. Plant vendors are proposing programmable digital automation systems for both the safety-related and the operational I and C (instrumentation and control) systems in this new unit. Also in existing plant units the replacement of certain old analog systems with state-of-the-art digital ones will become necessary in the years to come. Licensing of programmable systems for safety critical applications requires a new approach due to the special properties and failure modes of these systems. The major difficulties seem to be in the assessment and quantification of software reliability. The Technical Research Centre of Finland has in co-operation with the authority and the utilities conducted a project (AJA) to develop domestically applicable licensing requirements, guidelines and practices. International standards, guidelines and licensing practices have been analyzed in order to specify national licensing requirements. The paper describes and discusses the findings and experiences of the AJA project so far. The experience in introducing advanced programmable digital control and computer systems in the operating nuclear power plants will be covered briefly. Although these systems are not safety-related but systems of more general interest regarding nuclear safety, some routines regarding the licensing of safety- related systems have been followed. In these backfitting and replacement projects some experience have been gained in how to license safety-related programmable systems. (Author) 31 refs., 2 figs

  18. YouTube Videos to Create a "Virtual Hospital Experience" for Hip and Knee Replacement Patients to Decrease Preoperative Anxiety: A Randomized Trial.

    Science.gov (United States)

    O'Connor, Mary I; Brennan, Katharyn; Kazmerchak, Shari; Pratt, Jason

    2016-04-18

    With declining reimbursement to health care systems, face-to-face time between patients and providers to optimize preoperative education and counseling may be challenging. Because high patient anxiety prior to surgery has been linked to more severe and persistent pain after joint replacement surgery, the Orthopedic Surgery Department at Mayo Clinic in Florida created a playlist of 16 YouTube videos aimed at creating a virtual hospital experience for primary total hip and knee joint replacement patients. A randomized trial was then performed to evaluate the potential impact of viewing this playlist on preoperative anxiety. Each patient completed a Generalized Anxiety Disorder (GAD) score assessment at the time of the routine preoperative clinic visit and then randomized based on his/her gender, type of surgery, and initial GAD score to either the control group of standard education (education at face-to-face clinical visits as well as printed educational materials) or the treatment group (standard education plus access to the YouTube playlist). On the morning of the patient's surgery, the same survey was repeated. Of the 65 patients who consented to participate in the study, 53 completed the study (82%) with 28 of 29 (97% completed) in the control group and 25 of 36 (69% completed) in the treatment group. Overall, the results showed a trend toward less anxiety in patients who viewed the YouTube videos; this was exhibited by a reduction in the median GAD score by 1 point. This trend is more clearly present in patients with high preoperative anxiety (predominantly women), as seen in the reduction of the median GAD score by 6 points in the treatment group. Although our experience is limited, our results indicate that a series of tailored videos may decrease patient anxiety preoperatively. We recommend further exploration of both this concept and the use of social media tools in preoperative patient education. Clinicaltrials.gov NCT02546180; http

  19. Breakfast replacement with a low-glycaemic response liquid formula in patients with type 2 diabetes: a randomised clinical trial

    NARCIS (Netherlands)

    Stenvers, Dirk J.; Schouten, Lydia J.; Jurgens, Jordy; Endert, Erik; Kalsbeek, Andries; Fliers, Eric; Bisschop, Peter H.

    2014-01-01

    Low-glycaemic index diets reduce glycated Hb (HbA1c) in patients with type 2 diabetes, but require intensive dietary support. Using a liquid meal replacement with a low glycaemic response (GR) may be an alternative dietary approach. In the present study, we investigated whether breakfast replacement

  20. Breakfast replacement with a low-glycaemic response liquid formula in patients with type 2 diabetes : a randomised clinical trial

    NARCIS (Netherlands)

    Stenvers, Dirk J; Schouten, Lydia J; Jurgens, Jordy; Endert, Erik; Kalsbeek, A.; Fliers, Eric; Bisschop, Peter H

    2014-01-01

    Low-glycaemic index diets reduce glycated Hb (HbA1c) in patients with type 2 diabetes, but require intensive dietary support. Using a liquid meal replacement with a low glycaemic response (GR) may be an alternative dietary approach. In the present study, we investigated whether breakfast replacement

  1. Prolonged Intermittent Renal Replacement Therapy.

    Science.gov (United States)

    Edrees, Fahad; Li, Tingting; Vijayan, Anitha

    2016-05-01

    Prolonged intermittent renal replacement therapy (PIRRT) is becoming an increasingly popular alternative to continuous renal replacement therapy in critically ill patients with acute kidney injury. There are significant practice variations in the provision of PIRRT across institutions, with respect to prescription, technology, and delivery of therapy. Clinical trials have generally demonstrated that PIRRT is non-inferior to continuous renal replacement therapy regarding patient outcomes. PIRRT offers cost-effective renal replacement therapy along with other advantages such as early patient mobilization and decreased nursing time. However, due to lack of standardization of the procedure, PIRRT still poses significant challenges, especially pertaining to appropriate drug dosing. Future guidelines and clinical trials should work toward developing consensus definitions for PIRRT and ensure optimal delivery of therapy. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  2. Replacement of five main block valves without interruption of normal operation in a remote NGL station placed at 13400 FT AMSL, challenge and strategies

    Energy Technology Data Exchange (ETDEWEB)

    Quinto, Yamil; Morales, Raul; Elorreaga, Gerson [Compania Operadora del Gas del Amazonas, Lima (Peru)

    2012-07-01

    The present paper is aimed to share experience of the replacement of five block valves carried on in a pressure reduction station remotely operated and located in a remote area in The Andes of Peru at 13400 ft AMSL. To accomplish the job, it was necessary the construction of a temporary bypass made of carbon steel pipeline with its own regulating, instrumentation and automation facilities, hence capable of reduce the NGL pressure, controlled and remotely operated by a SCADA system. The temporary bypass connection and disconnection to put on service was carried out using Hot Tap and Line Stop equipment. The replacement of the five block valves was met without interruption of the hydrocarbons flow, and resetting the pressure reduction station to steady operating conditions. Besides the operating works these activities involve safety considerations for personal working in high altitudes. The outputs were the successful replacements of the block valves, and most important was that the NGL continuous flow was met, so both the production and processing plants were supplied with the daily transportation rates in standard conditions, and in accordance with the requirements of the plant operation. (author)

  3. A Bayesian perspective on some replacement strategies

    International Nuclear Information System (INIS)

    Mazzuchi, Thomas A.; Soyer, Refik

    1996-01-01

    In this paper we present a Bayesian decision theoretic approach for determining optimal replacement strategies. This approach enables us to formally incorporate, express, and update our uncertainty when determining optimal replacement strategies. We develop relevant expressions for both the block replacement protocol with minimal repair and the age replacement protocol and illustrate the use of our approach with real data

  4. Transcatheter aortic valve prosthesis surgically replaced 4 months after implantation

    DEFF Research Database (Denmark)

    Thyregod, Hans Gustav; Lund, Jens Teglgaard; Engstrøm, Thomas

    2010-01-01

    Transcatheter aortic valve implantation is a new and rapidly evolving treatment option for high-risk surgical patients with degenerative aortic valve stenosis. Long-term results with these new valve prostheses are lacking, and potential valve dysfunction and failure would require valve replacemen....... We report the first case of surgical valve replacement in a patient with a dysfunctional transcatheter-implanted aortic valve prosthesis 4 months after implantation....

  5. Spine imaging after lumbar disc replacement: pitfalls and current recommendations

    OpenAIRE

    Robinson, Yohan; Sand?n, Bengt

    2009-01-01

    Abstract Background Most lumbar artificial discs are still composed of stainless steel alloys, which prevents adequate postoperative diagnostic imaging of the operated region when using magnetic resonance imaging (MRI). Thus patients with postoperative radicular symptoms or claudication after stainless steel implants often require alternative diagnostic procedures. Methods Possible complications of lumbar total disc replacement (TDR) are reviewed from the available literature and imaging reco...

  6. Pressure tube replacement in Pickering NGS A units 1 and 2

    International Nuclear Information System (INIS)

    Irvine, H.S.; Bennett, E.J.; Talbot, K.H.

    1986-10-01

    Being able to technically and economically replace the most radioactive components (excluding the nuclear fuel) in operating reactors will help to ensure the ongoing acceptance of nuclear power as a viable energy source for the future. Ontario Hydro is well along the path to meeting the above objective for its CANDU-PHW reactors. Following the failure of a Zircaloy-II pressure tube in unit 2 of Pickering NGS A in August, 1983, Ontario Hydro has embarked on a program to replace all Zircaloy-II pressure tubes in units 1 and 2 at Pickering. This program integrates the in-house research, design, construction, and operating skills of a large utility (Ontario Hydro) with the skills of a national nuclear organization (Atomic Energy of Canada Limited) and the private engineering sector of the Canadian nuclear industry. The paper describes the background to the pressure tube failure in Pickering unit 2 and to the efforts incurred in understanding the failure mechanism and how similar failures are not expected for the zirconium-niobium pressure tube material used in all other large CANDU-PHW units after units 1 and 2 of Pickering NGS A. The tooling developed for the pressure tube replacement program is described as well as the organization to undertake the program in an operating nuclear station. The retubing of units 1 and 2 at Pickering NGS A is nearing a successful completion and shows the benefits of being able to integrate the various skills required for this success. Pressure tube replacement in a CANDU-PHW reactor is equivalent to replacement of the reactor vessel in a LWR. The fact that this replacement can be done economically and with acceptable radiation dose to workers augurs well for the continued viability of the use of nuclear energy for the benefit of mankind. (author)

  7. EBR-II experience with sodium cleaning and radioactivity decontamination

    International Nuclear Information System (INIS)

    Ruther, W.E.; Smith, C.R.F.

    1978-01-01

    The EBR-II is now in Its 13th year of operation. During that period more than 2400 subassemblies have been cleaned of sodium without a serious incident of any kind by a two-step process developed at Argonne. Sodium cleaning and decontamination of other reactor components has been performed only on the relatively few occasions in which a repair or replacement has been required. A summary of the EBR-II experience will be presented. A new facility will be described for the improved cleaning and maintenance of sodium-wetted primary components

  8. EBR-II experience with sodium cleaning and radioactivity decontamination

    Energy Technology Data Exchange (ETDEWEB)

    Ruther, W E; Smith, C R.F. [Argonne National Laboratory, Argonne (United States)

    1978-08-01

    The EBR-II is now in Its 13th year of operation. During that period more than 2400 subassemblies have been cleaned of sodium without a serious incident of any kind by a two-step process developed at Argonne. Sodium cleaning and decontamination of other reactor components has been performed only on the relatively few occasions in which a repair or replacement has been required. A summary of the EBR-II experience will be presented. A new facility will be described for the improved cleaning and maintenance of sodium-wetted primary components.

  9. Transforming Normal Programs by Replacement

    NARCIS (Netherlands)

    Bossi, Annalisa; Pettorossi, A.; Cocco, Nicoletta; Etalle, Sandro

    1992-01-01

    The replacement transformation operation, already defined in [28], is studied wrt normal programs. We give applicability conditions able to ensure the correctness of the operation wrt Fitting's and Kunen's semantics. We show how replacement can mimic other transformation operations such as thinning,

  10. Replacement of heavy components of the Main Primary System (MPS). Recent innovations made by Framatome ANP

    International Nuclear Information System (INIS)

    Chanussot, J.M.; Thevenet, R.

    2006-01-01

    The replacement of heavy components is the result of widespread stress corrosion of Inconel 600 (and alloys 82/182) in the primary system. Following the corrosion of steam generator tubes, which led to the first steam generator replacement (SGR) operations, work has begun on reactor vessel head replacements (RVHR) and pressurizer replacements, pending treatment of the dissimilar butt welds (DBW). The replacement of sections of the Main Primary System is one way of optimizing plant lifetime besides preventing stress corrosion in primary components and combating phenomena as thermal fatigue or certain metallurgical weaknesses. The increase in the number of major operations carried out in the reactor building on PWR and BWR reactor geometries has called for major technical innovations. AREVA, has over the past twenty years carried out more than forty SGRs throughout the world, including the supply of 115 steam generators of all types. This equates to over 60% of all SGR operations performed in Europe and the USA. Today, most SGR operations are performed in the USA, though some still continue in Europe and Asia. Operations have been planned until 2015. The first RVHR operations were carried out in France in 1993, and have been widespread in Europe since 1996 (Spain and Belgium), and in the USA since 2002 (Davis Besse). Since 1993 AREVA, through its subsidiaries Framatome ANP, Jeumont SA and SGT, has performed 72 RVHRs, i.e. most of those carried out in Europe and the USA. Today, RVHR operations take place throughout the world and have been planned until 2014. The first pressurizer replacement took place in the fall of 2005 in Saint Lucie, USA. Others are to follow (Fort Calhoun, Millestone). A significant number of partial or complete pressurizer replacements are now being scheduled. Special focus must be given to this new operation, as a decision is required between the following types of replacements, taking into account the number of pressurizer heaters and the

  11. Replacement of sub-systems

    International Nuclear Information System (INIS)

    Rosen, S.E.

    1992-01-01

    This paper describes a number of quality aspects related to replacement of important systems or components in a nuclear power station. Reference is given to the steam generator replacement and power uprating performed at Ringhals 2 in Sweden in 1989. Since quality is a wide concept there has been put special emphasis in this paper to the important aspects that traditionally are not connected to quality. (author) 1 fig

  12. Acceptance test for 900 MWe PWR unit replacement steam generators

    International Nuclear Information System (INIS)

    Gourguechon, B.

    1993-01-01

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG's differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs

  13. Neutron beam facilities at the Replacement Research Reactor, ANSTO

    International Nuclear Information System (INIS)

    Kim, S.

    2003-01-01

    The exciting development for Australia is the construction of a modern state-of-the-art 20-MW Replacement Research Reactor which is currently under construction to replace the aging reactor (HIFAR) at ANSTO in 2006. To cater for advanced scientific applications, the replacement reactor will provide not only thermal neutron beams but also a modern cold-neutron source moderated by liquid deuterium at approximately -250 deg C, complete with provision for installation of a hot-neutron source at a later stage. The latest 'supermirror' guides will be used to transport the neutrons to the Reactor Hall and its adjoining Neutron Guide Hall where a suite of neutron beam instruments will be installed. These new facilities will expand and enhance ANSTO's capabilities and performance in neutron beam science compared with what is possible with the existing HIFAR facilities, and will make ANSTO/Australia competitive with the best neutron facilities in the world. Eight 'leading-edge' neutron beam instruments are planned for the Replacement Research Reactor when it goes critical in 2006, followed by more instruments by 2010 and beyond. Up to 18 neutron beam instruments can be accommodated at the Replacement Research Reactor, however, it has the capacity for further expansion, including potential for a second Neutron Guide Hall. The first batch of eight instruments has been carefully selected in conjunction with a user group representing various scientific interests in Australia. A team of scientists, engineers, drafting officers and technicians has been assembled to carry out the Neutron Beam Instrument Project to successful completion. Today, most of the planned instruments have conceptual designs and are now being engineered in detail prior to construction and procurement. A suite of ancillary equipment will also be provided to enable scientific experiments at different temperatures, pressures and magnetic fields. This paper describes the Neutron Beam Instrument Project and gives

  14. Experience from replacement and check of thermocouples during reconstruction of in-reactor temperature measurements at Bohunice V-1 units 1 and 2

    International Nuclear Information System (INIS)

    Slanina, M.; Stanc, J.

    2001-01-01

    Replacement of thermocouples in the protection tube blocks was a key phase of the reconstruction of in-reactor temperature measurements at Bohunice V-1 with regard to the success, reliability and impact on safety of unit operation. The replacement consisted of reliable and safe withdrawal of 216 old thermocouples, their disposal and installation of new thermocouples into dry channels. In the material presented, this phase of reconstruction is described in details, with focus on the evaluation of replacement quality and check activities carried out at the new installed thermocouples. (Authors)

  15. An evaluation of information on the Internet of a new device: the lumbar artificial disc replacement.

    Science.gov (United States)

    Garcia, Ryan M; Messerschmitt, Patrick J; Ahn, Nicholas U

    2009-02-01

    An analysis of websites, accessible to the public, was conducted pertaining to the lumbar artificial disc replacement. The objective was to investigate the content of information available on the Internet pertaining to the lumbar artificial disc replacement. The Internet is widely used by patients as an educational tool for health care information. Additionally, the Internet is used as a medium for direct-to-consumer marketing. Recent approval of the lumbar artificial disc replacement has led to the emergence of numerous websites offering information about this procedure. It is thought that patients can be influenced by information found on the Internet; therefore, it is imperative that this information be accurate and as complete as possible. Three commonly used search engines were used to locate 105 (35/search engine) websites providing information about the lumbar artificial disc replacement. Each website was evaluated with regard to authorship and content. Fifty-nine percent of the websites reviewed were authorized by a private physician group, 9% by an academic physician group, 6% by industry, 11% were news reports, and 15% were not otherwise categorized. Seventy-two percent offered a mechanism for direct contact and 30% provided clear patient selection criteria. Benefits were expressed in 87% of websites, whereas associated risks were described in 28% or less. European experiences were noted in 53%, whereas only 22% of websites detailed the current US experience. The results of this study demonstrate that much of the content of Internet-derived information pertaining to the lumbar artificial disc replacement is potentially misleading. Until long-term data are available, patients should be cautioned when using the Internet as a source for health care information, particularly with regard to the lumbar artificial disc replacement.

  16. WATER SUPPLY PIPE REPLACEMENT CONSIDERING SUSTAINABLE TRANSITION TO POPULATION DECREASED SOCIETY

    Science.gov (United States)

    Hosoi, Yoshihiko; Iwasaki, Yoji; Aklog, Dagnachew; Masuda, Takanori

    Social infrastructures are aging and population is decreasing in Japan. The aged social infrastructures should be renewed. At the same time, they are required to be moved into new framework suitable for population decreased societies. Furthermore, they have to continue to supply sufficient services even during transition term that renewal projects are carried out. Authors propose sustainable soft landing management of infrastructures and it is tried to apply to water supply pipe replacement in this study. Methodology to replace aged pipes not only aiming for the new water supply network which suits for population decreased condition but also ensuring supply service and feasibility while the project is carried out was developed. It is applied for a model water supply network and discussions were carried out.

  17. A study of fine aggregate replacement with fly ash an environmental friendly and economical solution.

    Science.gov (United States)

    Pofale, A D; Deo, S V

    2010-10-01

    The use of fly ash as a replacement of sand has a great potential to benefit our society in terms of reducing demand of natural sand, reducing environmental problems, conserving energy and reducing landfill area requirement. This paper presents an approach to increase the utilization of fly ash and conserve scarcely available natural sand for sustainable development. The experimental investigation by the inclusion of fly ash as a partial replacement of sand as compared to control cement mortar mixes indicated 50% to 100% increase in the compressive strength of mortar at 91 days. Replacement of 50% sand with fly ash can save about 0.4 m3 sand. Comparison of cost per N/mm2 compressive strength has shown about 40% to 60% saving in cost. Based on the experimental results, correlations are developed for finding out the compressive strength and cost at 28 and 91 days. Sand was replaced with 10% to 50% of fly ash by weight and 0.5, 0.55, 0.6 and 0.65 W/C ratios were used. Flow test performed for mortar revealed that as the percentage replacement of sand with the fly ash increased the flow of the mortar decreased. It was also observed that wet and dry densities were more than the control mortar for 10% & 20% replacement of sand with fly ash but for higher replacement percentage density reduced marginally.

  18. On the application of the expected log-likelihood gain to decision making in molecular replacement.

    Science.gov (United States)

    Oeffner, Robert D; Afonine, Pavel V; Millán, Claudia; Sammito, Massimo; Usón, Isabel; Read, Randy J; McCoy, Airlie J

    2018-04-01

    Molecular-replacement phasing of macromolecular crystal structures is often fast, but if a molecular-replacement solution is not immediately obtained the crystallographer must judge whether to pursue molecular replacement or to attempt experimental phasing as the quickest path to structure solution. The introduction of the expected log-likelihood gain [eLLG; McCoy et al. (2017), Proc. Natl Acad. Sci. USA, 114, 3637-3641] has given the crystallographer a powerful new tool to aid in making this decision. The eLLG is the log-likelihood gain on intensity [LLGI; Read & McCoy (2016), Acta Cryst. D72, 375-387] expected from a correctly placed model. It is calculated as a sum over the reflections of a function dependent on the fraction of the scattering for which the model accounts, the estimated model coordinate error and the measurement errors in the data. It is shown how the eLLG may be used to answer the question `can I solve my structure by molecular replacement?'. However, this is only the most obvious of the applications of the eLLG. It is also discussed how the eLLG may be used to determine the search order and minimal data requirements for obtaining a molecular-replacement solution using a given model, and for decision making in fragment-based molecular replacement, single-atom molecular replacement and likelihood-guided model pruning.

  19. Predictors of length of stay and patient satisfaction after hip and knee replacement surgery: fast-track experience in 712 patients

    DEFF Research Database (Denmark)

    Husted, Henrik; Holm, Gitte; Jacobsen, Steffen

    2008-01-01

    BACKGROUND AND PURPOSE: Very few studies have focused on patient characteristics that influence length of stay (LOS) in fast-track total hip (THR) and knee arthroplasty (TKR). The aim of this prospective study was to identify patient characteristics associated with LOS and patient satisfaction...... after total hip and knee replacement surgery. PATIENTS AND METHODS: Between September 2003 and December 2005, 712 consecutive, unselected patients (440 women) with a mean age of 69 (31-91) years were admitted for hip and knee replacement surgery at our specialized fast-track joint replacement unit....... Epidemiological, physical, and perioperative parameters were registered and correlated to LOS and patient satisfaction. RESULTS: 92% of the patients were discharged directly to their homes within 5 days, and 41% were discharged within 3 days. Age, sex, marital status, co-morbidity, preoperative use of walking...

  20. Remotely replaceable fuel and feed nozzles for the new waste calcining facility calciner vessel

    International Nuclear Information System (INIS)

    Fletcher, R.D.; Carter, J.A.; May, K.W.

    1978-01-01

    The development and testing of remotely replaceable fuel and feed nozzles for calcination of liquid radioactive wastes in the calciner vessel of the New Waste Calcining Facility being built at the Idaho National Engineering Laboratory is described. A complete fuel nozzle assembly was fabricated and tested at the Remote Maintenance Development Facility to evolve design refinements, identify required support equipment, and develop handling techniques. The design also provided for remote replacement of the nozzle support carriage and adjacent feed and fuel pipe loops using two pairs of master-slave manipulators

  1. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  2. Evaluation of genomic selection for replacement strategies using selection index theory.

    Science.gov (United States)

    Calus, M P L; Bijma, P; Veerkamp, R F

    2015-09-01

    Our objective was to investigate the economic effect of prioritizing heifers for replacement at the herd level based on genomic estimated breeding values, and to compute break-even genotyping costs across a wide range of scenarios. Specifically, we aimed to determine the optimal proportion of preselection based on parent average information for all scenarios considered. Considered replacement strategies include a range of different selection intensities by considering different numbers of heifers available for replacement (15-45 in a herd with 100 dairy cows) as well as different replacement rates (15-40%). Use of conventional versus sexed semen was considered, where the latter resulted in having twice as many heifers available for replacement. The baseline scenario relies on prioritization of replacement heifers based on parent average. The first alternative scenario involved genomic selection of heifers, considering that all heifers were genotyped. The benefits of genomic selection in this scenario were computed using a simple formula that only requires the number of lactating animals, the difference in accuracy between parent average and genomic selection (GS), and the selection intensity as input. When all heifers were genotyped, using GS for replacement of heifers was beneficial in most scenarios for current genotyping prices, provided some room exists for selection, in the sense that at least 2 more heifers are available than needed for replacement. In those scenarios, minimum break-even genotyping costs were equal to half the economic value of a standard deviation of the breeding goal. The second alternative scenario involved a preselection based on parent average, followed by GS among all the preselected heifers. It was in almost all cases beneficial to genotype all heifers when conventional semen was used (i.e., to do no preselection). The optimal proportion of preselection based on parent average was at least 0.63 when sexed semen was used. Use of sexed

  3. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Howden, G.F.

    1996-01-01

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  4. Procedural Experience for Transcatheter Aortic Valve Replacement and Relation to Outcomes: The STS/ACC TVT Registry.

    Science.gov (United States)

    Carroll, John D; Vemulapalli, Sreekanth; Dai, Dadi; Matsouaka, Roland; Blackstone, Eugene; Edwards, Fred; Masoudi, Frederick A; Mack, Michael; Peterson, Eric D; Holmes, David; Rumsfeld, John S; Tuzcu, E Murat; Grover, Frederick

    2017-07-04

    Transcatheter aortic valve replacement (TAVR) has been introduced into U.S. clinical practice with efforts to optimize outcomes and minimize the learning curve. The goal of this study was to assess the degree to which increasing experience during the introduction of this procedure, separated from other outcome determinants including patient and procedural characteristics, is associated with outcomes. The authors evaluated the association of hospital TAVR volume and patient outcomes for TAVR by using data from 42,988 commercial procedures conducted at 395 hospitals submitting to the Transcatheter Valve Therapy Registry from 2011 through 2015. Outcomes assessed included adjusted and unadjusted in-hospital major adverse events. Increasing site volume was associated with lower in-hospital risk-adjusted outcomes, including mortality (p < 0.02), vascular complications (p < 0.003), and bleeding (p < 0.001) but was not associated with stroke (p = 0.14). From the first case to the 400th case in the volume-outcome model, risk-adjusted adverse outcomes declined, including mortality (3.57% to 2.15%), bleeding (9.56% to 5.08%), vascular complications (6.11% to 4.20%), and stroke (2.03% to 1.66%). Vascular and bleeding volume-outcome associations were nonlinear with a higher risk of adverse outcomes in the first 100 cases. An association of procedure volume with risk-adjusted outcomes was also seen in the subgroup having transfemoral access. The initial adoption of TAVR into practice in the United States showed that increasing experience was associated with better outcomes. This association, whether deemed a prolonged learning curve or a manifestation of a volume-outcome relationship, suggested that concentrating experience in higher volume heart valve centers might be a means of improving outcomes. (STS/ACC Transcatheter Valve Therapy Registry [TVT Registry]; NCT01737528). Copyright © 2017 American College of Cardiology Foundation. Published by Elsevier Inc. All

  5. Effects of replacing soybean meal with xylose-treated soybean meal on performance of nursing Awassi ewes and fattening lambs

    Directory of Open Access Journals (Sweden)

    Mofleh S. Awawdeh

    2010-09-01

    Full Text Available Two experiments were conducted to evaluate the effect of replacing soybean meal with xylose-treated soybean meal (soypass meal; SPM on performance of nursing Awassi ewes and fattening lambs. In Experiment 1, lasting for eight weeks, 39 Awassi ewes and their lambs were randomly assigned to three diets. Diets were formulated by replacing soybean meal from the basal diet (CON-SBM; n=13 with 50% (50% SPM; n=13 and 100% (100% SPM; n=13 SPM. Initial and final weights of the ewes were not different (P>0.55 among diets. Total gain and average daily gain (ADG of lambs were similar (P=0.44 among diets. Ewes fed the CON-SBM diet tended (P0.38 in milk component percentages among diets were observed. In Experiment 2, lasting for 63 days, twenty weaned lambs were used to determine the effects of replacing soybean meal with SPM on growth performance. Diets were either soybean meal (SBM; n=10 or SPM (SPM; n=10. Nutrient intake and digestibility were not different between diets. However, rumen undegradable protein intake was greater (P0.05 between the diets. Results suggest that replacement of soybean meal with soypass meal is not likely to produce any production benefits in nursing Awassi ewes and fattening lambs except for the slight improvement of milk yield.

  6. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  7. Optimal composition of fluid-replacement beverages.

    Science.gov (United States)

    Baker, Lindsay B; Jeukendrup, Asker E

    2014-04-01

    The objective of this article is to provide a review of the fundamental aspects of body fluid balance and the physiological consequences of water imbalances, as well as discuss considerations for the optimal composition of a fluid replacement beverage across a broad range of applications. Early pioneering research involving fluid replacement in persons suffering from diarrheal disease and in military, occupational, and athlete populations incurring exercise- and/or heat-induced sweat losses has provided much of the insight regarding basic principles on beverage palatability, voluntary fluid intake, fluid absorption, and fluid retention. We review this work and also discuss more recent advances in the understanding of fluid replacement as it applies to various populations (military, athletes, occupational, men, women, children, and older adults) and situations (pathophysiological factors, spaceflight, bed rest, long plane flights, heat stress, altitude/cold exposure, and recreational exercise). We discuss how beverage carbohydrate and electrolytes impact fluid replacement. We also discuss nutrients and compounds that are often included in fluid-replacement beverages to augment physiological functions unrelated to hydration, such as the provision of energy. The optimal composition of a fluid-replacement beverage depends upon the source of the fluid loss, whether from sweat, urine, respiration, or diarrhea/vomiting. It is also apparent that the optimal fluid-replacement beverage is one that is customized according to specific physiological needs, environmental conditions, desired benefits, and individual characteristics and taste preferences.

  8. Utilizing inheritance in requirements engineering

    Science.gov (United States)

    Kaindl, Hermann

    1994-01-01

    The scope of this paper is the utilization of inheritance for requirements specification, i.e., the tasks of analyzing and modeling the domain, as well as forming and defining requirements. Our approach and the tool supporting it are named RETH (Requirements Engineering Through Hypertext). Actually, RETH uses a combination of various technologies, including object-oriented approaches and artificial intelligence (in particular frames). We do not attempt to exclude or replace formal representations, but try to complement and provide means for gradually developing them. Among others, RETH has been applied in the CERN (Conseil Europeen pour la Rechereche Nucleaire) Cortex project. While it would be impossible to explain this project in detail here, it should be sufficient to know that it deals with a generic distributed control system. Since this project is not finished yet, it is difficult to state its size precisely. In order to give an idea, its final goal is to substitute the many existing similar control systems at CERN by this generic approach. Currently, RETH is also tested using real-world requirements for the Pastel Mission Planning System at ESOC in Darmstadt. First, we outline how hypertext is integrated into a frame system in our approach. Moreover, the usefulness of inheritance is demonstrated as performed by the tool RETH. We then summarize our experiences of utilizing inheritance in the Cortex project. Lastly, RETH will be related to existing work.

  9. The welfare implications of using exotic tortoises as ecological replacements.

    Science.gov (United States)

    Griffiths, Christine J; Zuël, Nicolas; Tatayah, Vikash; Jones, Carl G; Griffiths, Owen; Harris, Stephen

    2012-01-01

    Ecological replacement involves the introduction of non-native species to habitats beyond their historical range, a factor identified as increasing the risk of failure for translocations. Yet the effectiveness and success of ecological replacement rely in part on the ability of translocatees to adapt, survive and potentially reproduce in a novel environment. We discuss the welfare aspects of translocating captive-reared non-native tortoises, Aldabrachelys gigantea and Astrochelys radiata, to two offshore Mauritian islands, and the costs and success of the projects to date. Because tortoises are long-lived, late-maturing reptiles, we assessed the progress of the translocation by monitoring the survival, health, growth, and breeding by the founders. Between 2000 and 2011, a total of 26 A. gigantea were introduced to Ile aux Aigrettes, and in 2007 twelve sexually immature A. gigantea and twelve male A. radiata were introduced to Round Island, Mauritius. Annual mortality rates were low, with most animals either maintaining or gaining weight. A minimum of 529 hatchlings were produced on Ile aux Aigrettes in 11 years; there was no potential for breeding on Round Island. Project costs were low. We attribute the success of these introductions to the tortoises' generalist diet, habitat requirements, and innate behaviour. Feasibility analyses for ecological replacement and assisted colonisation projects should consider the candidate species' welfare during translocation and in its recipient environment. Our study provides a useful model for how this should be done. In addition to serving as ecological replacements for extinct Mauritian tortoises, we found that releasing small numbers of captive-reared A. gigantea and A. radiata is cost-effective and successful in the short term. The ability to release small numbers of animals is a particularly important attribute for ecological replacement projects since it reduces the potential risk and controversy associated with

  10. The welfare implications of using exotic tortoises as ecological replacements.

    Directory of Open Access Journals (Sweden)

    Christine J Griffiths

    Full Text Available Ecological replacement involves the introduction of non-native species to habitats beyond their historical range, a factor identified as increasing the risk of failure for translocations. Yet the effectiveness and success of ecological replacement rely in part on the ability of translocatees to adapt, survive and potentially reproduce in a novel environment. We discuss the welfare aspects of translocating captive-reared non-native tortoises, Aldabrachelys gigantea and Astrochelys radiata, to two offshore Mauritian islands, and the costs and success of the projects to date.Because tortoises are long-lived, late-maturing reptiles, we assessed the progress of the translocation by monitoring the survival, health, growth, and breeding by the founders. Between 2000 and 2011, a total of 26 A. gigantea were introduced to Ile aux Aigrettes, and in 2007 twelve sexually immature A. gigantea and twelve male A. radiata were introduced to Round Island, Mauritius. Annual mortality rates were low, with most animals either maintaining or gaining weight. A minimum of 529 hatchlings were produced on Ile aux Aigrettes in 11 years; there was no potential for breeding on Round Island. Project costs were low. We attribute the success of these introductions to the tortoises' generalist diet, habitat requirements, and innate behaviour.Feasibility analyses for ecological replacement and assisted colonisation projects should consider the candidate species' welfare during translocation and in its recipient environment. Our study provides a useful model for how this should be done. In addition to serving as ecological replacements for extinct Mauritian tortoises, we found that releasing small numbers of captive-reared A. gigantea and A. radiata is cost-effective and successful in the short term. The ability to release small numbers of animals is a particularly important attribute for ecological replacement projects since it reduces the potential risk and controversy

  11. Computer simulation of replacement sequences in copper

    International Nuclear Information System (INIS)

    Schiffgens, J.O.; Schwartz, D.W.; Ariyasu, R.G.; Cascadden, S.E.

    1978-01-01

    Results of computer simulations of , , and replacement sequences in copper are presented, including displacement thresholds, focusing energies, energy losses per replacement, and replacement sequence lengths. These parameters are tabulated for six interatomic potentials and shown to vary in a systematic way with potential stiffness and range. Comparisons of results from calculations made with ADDES, a quasi-dynamical code, and COMENT, a dynamical code, show excellent agreement, demonstrating that the former can be calibrated and used satisfactorily in the analysis of low energy displacement cascades. Upper limits on , , and replacement sequences were found to be approximately 10, approximately 30, and approximately 14 replacements, respectively. (author)

  12. Self-consolidating concretes containing waste PET bottles as sand replacement

    Science.gov (United States)

    Khalid, Faisal Sheikh; Azmi, Nurul Bazilah; Mazenan, Puteri Natasya; Shahidan, Shahiron; Othman, Nor hazurina; Guntor, Nickholas Anting Anak

    2018-02-01

    This study evaluates the effect of self-consolidating concrete (SCC) containing waste polyethylene terephthalate (PET) granules on the fresh, mechanical and water absorption properties. Fine aggregates were replaced from 0% to 8% by PET granules. The fresh properties of SCC containing PET granules were determined using slump flow and V-funnel flow time tests. The compressive and splitting tensile strength were evaluated. The results indicated that utilization of waste PET granules in production of SCC could be an effective way for recycling purpose. The maximum amount of PET replacement should be limited to 5%. Exceeding 5% of PET content may result in an increase of V-funnel flow time to overpass the limiting value, decrease in strength. The production of high performance SCC containing 5% PET granules satisfies all the requirements for SCC with satisfactory outputs.

  13. Physical health problems experienced in the early postoperative recovery period following total knee replacement

    DEFF Research Database (Denmark)

    Szötz, Kirsten; Pedersen, Preben Ulrich; Hørdam, Britta

    2015-01-01

    of exercising in the early recovery period after discharge from hospital following total knee replacement. METHOD: A cross-sectional survey was conducted using a questionnaire. A total of 86 patients were included following first-time elective total knee replacement. Descriptive statistics were used. RESULTS......: The majority of the patients experienced leg oedema (90.7%). Secondary to this were pain (81.4%), sleeping disorders (47.7%) problems with appetite (38.4%) and bowel function (34.9%) were the most frequently identified physical health problems. In total, 69.8% of the patients indicated that they did...... not exercise or only partly exercise as recommended, but without associated experience of pain. CONCLUSION: Patients experienced a wide range of physical health problems following total knee replacement and deviation from recommended self-training was identified. These findings are valuable for health...

  14. 14 CFR 65.115 - Senior parachute rigger certificate: Experience, knowledge, and skill requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Senior parachute rigger certificate... CREWMEMBERS Parachute Riggers § 65.115 Senior parachute rigger certificate: Experience, knowledge, and skill requirements. Except as provided in § 65.117, an applicant for a senior parachute rigger certificate must— (a...

  15. Reduction rules-based search algorithm for opportunistic replacement strategy of multiple life-limited parts

    Directory of Open Access Journals (Sweden)

    Xuyun FU

    2018-01-01

    Full Text Available The opportunistic replacement of multiple Life-Limited Parts (LLPs is a problem widely existing in industry. The replacement strategy of LLPs has a great impact on the total maintenance cost to a lot of equipment. This article focuses on finding a quick and effective algorithm for this problem. To improve the algorithm efficiency, six reduction rules are suggested from the perspectives of solution feasibility, determination of the replacement of LLPs, determination of the maintenance occasion and solution optimality. Based on these six reduction rules, a search algorithm is proposed. This search algorithm can identify one or several optimal solutions. A numerical experiment shows that these six reduction rules are effective, and the time consumed by the algorithm is less than 38 s if the total life of equipment is shorter than 55000 and the number of LLPs is less than 11. A specific case shows that the algorithm can obtain optimal solutions which are much better than the result of the traditional method in 10 s, and it can provide support for determining to-be-replaced LLPs when determining the maintenance workscope of an aircraft engine. Therefore, the algorithm is applicable to engineering applications concerning opportunistic replacement of multiple LLPs in aircraft engines.

  16. Permanent Quadriplegia Following Replacement of Voice Prosthesis.

    Science.gov (United States)

    Ozturk, Kayhan; Erdur, Omer; Kibar, Ertugrul

    2016-11-01

    The authors presented a patient with quadriplegia caused by cervical spine abscess following voice prosthesis replacement. The authors present the first reported permanent quadriplegia patient caused by voice prosthesis replacement. The authors wanted to emphasize that life-threatening complications may be faced during the replacement of voice prosthesis. Care should be taken during the replacement of voice prosthesis and if some problems have been faced during the procedure patients must be followed closely.

  17. Esophageal tissue engineering: a new approach for esophageal replacement.

    Science.gov (United States)

    Totonelli, Giorgia; Maghsoudlou, Panagiotis; Fishman, Jonathan M; Orlando, Giuseppe; Ansari, Tahera; Sibbons, Paul; Birchall, Martin A; Pierro, Agostino; Eaton, Simon; De Coppi, Paolo

    2012-12-21

    A number of congenital and acquired disorders require esophageal tissue replacement. Various surgical techniques, such as gastric and colonic interposition, are standards of treatment, but frequently complicated by stenosis and other problems. Regenerative medicine approaches facilitate the use of biological constructs to replace or regenerate normal tissue function. We review the literature of esophageal tissue engineering, discuss its implications, compare the methodologies that have been employed and suggest possible directions for the future. Medline, Embase, the Cochrane Library, National Research Register and ClinicalTrials.gov databases were searched with the following search terms: stem cell and esophagus, esophageal replacement, esophageal tissue engineering, esophageal substitution. Reference lists of papers identified were also examined and experts in this field contacted for further information. All full-text articles in English of all potentially relevant abstracts were reviewed. Tissue engineering has involved acellular scaffolds that were either transplanted with the aim of being repopulated by host cells or seeded prior to transplantation. When acellular scaffolds were used to replace patch and short tubular defects they allowed epithelial and partial muscular migration whereas when employed for long tubular defects the results were poor leading to an increased rate of stenosis and mortality. Stenting has been shown as an effective means to reduce stenotic changes and promote cell migration, whilst omental wrapping to induce vascularization of the construct has an uncertain benefit. Decellularized matrices have been recently suggested as the optimal choice for scaffolds, but smart polymers that will incorporate signalling to promote cell-scaffold interaction may provide a more reproducible and available solution. Results in animal models that have used seeded scaffolds strongly suggest that seeding of both muscle and epithelial cells on scaffolds

  18. Esophageal tissue engineering: A new approach for esophageal replacement

    Institute of Scientific and Technical Information of China (English)

    Giorgia Totonelli; Panagiotis Maghsoudlou; Jonathan M Fishman; Giuseppe Orlando; Tahera Ansari; Paul Sibbons; Martin A Birchall

    2012-01-01

    A number of congenital and acquired disorders require esophageal tissue replacement.Various surgical techniques,such as gastric and colonic interposition,are standards of treatment,but frequently complicated by stenosis and other problems.Regenerative medicine approaches facilitate the use of biological constructs to replace or regenerate normal tissue function.We review the literature of esophageal tissue engineering,discuss its implications,compare the methodologies that have been employed and suggest possible directions for the future.Medline,Embase,the Cochrane Library,National Research Register and ClinicalTrials.gov databases were searched with the following search terms:stem cell and esophagus,esophageal replacement,esophageal tissue engineering,esophageal substitution.Reference lists of papers identified were also examined and experts in this field contacted for further information.All full-text articles in English of all potentially relevant abstracts were reviewed.Tissue engineering has involved acellular scaffolds that were either transplanted with the aim of being repopulated by host cells or seeded prior to transplantation.When acellular scaffolds were used to replace patch and short tubular defects they allowed epithelial and partial muscular migration whereas when employed for long tubular defects the results were poor leading to an increased rate of stenosis and mortality.Stenting has been shown as an effective means to reduce stenotic changes and promote cell migration,whilst omental wrapping to induce vascularization of the construct has an uncertain benefit.Decellularized matrices have been recently suggested as the optimal choice for scaffolds,but smart polymers that will incorporate signalling to promote cell-scaffold interaction may provide a more reproducible and available solution.Results in animal models that have used seeded scaffolds strongly suggest that seeding of both muscle and epithelial cells on scaffolds prior to implantation is a

  19. 46 CFR 67.171 - Deletion; requirement and procedure.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Deletion; requirement and procedure. 67.171 Section 67...; Requirement for Exchange, Replacement, Deletion, Cancellation § 67.171 Deletion; requirement and procedure. (a... provided in § 67.161, and the vessel is subject to deletion from the roll of actively documented vessels...

  20. Status of the beryllium replacement project

    Energy Technology Data Exchange (ETDEWEB)

    Dimayuga, I. [Atomic Energy of Canada, Chalk River, Ontario (Canada); Corcoran, E. [Royal Military College of Canada, Kingston, Ontario (Canada); Daniels, T. [Ontario Power Generation, Pickering, Ontario (Canada); Harmsen, J. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada); Lu, E. [Bruce Power, Tiverton, Ontario (Canada); Onderwater, T.; Palleck, S. [General Electric- Hitachi, Wilmington, North Carolina (United States); Pant, A. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada)

    2013-07-01

    Currently, beryllium (Be) is used as the filler metal for brazing appendages on the sheaths of CANDU® fuel elements. Because of its toxicity, occupational exposure limits for Be are being reduced to very low levels, resulting in significant challenges to CANDU® fuel fabricators. The CANDU® Owners Group (COG) initiated a test program to identify a filler material to replace Be and confirm that the brazed joints meet the established technical requirements for CANDU® fuel. Together with eliminating health risks associated with the use of Be, the industry needs to be assured that continuation of fuel supply remains unaffected and that fuel fabrication processes continue to comply with health and safety standards. A literature survey of studies on brazing and joining of Zircaloy identified potential filler materials that can meet or exceed existing design requirements of the brazed joint, including the required mechanical, microstructural, corrosion resistance, and irradiation properties equivalent to those obtained with Be as braze material. Candidate materials were evaluated against several criteria, including manufacturability, melting point, wettability, mechanical properties, corrosion resistance, effect on neutron economy, potential activation products, and interaction with fuel channels and other related disciplines. This exercise resulted in a list of promising candidate materials that were recommended for the first phase of testing. These materials include stainless steel (304 or 316), Al-Si, Ni-P, and Zr-Mn alloys. To allow a CANDU® utility have sufficient confidence in considering implementation of a different braze filler material, a Be Replacement Test Program, involving out-reactor and in-reactor tests, is being undertaken as a collaborative endeavour by the Canadian nuclear industry. The out-reactor tests consist of: a constructability assessment to determine the material’s suitability with current fuel manufacturing methods; evaluation of

  1. Experience in initial training required for the recognition of the qualified RP expert in Spain

    International Nuclear Information System (INIS)

    Rodriguez Suarez, M.; Marco Arboli, M.; Menarguez, J.

    2003-01-01

    An important point of the actions inside the European framework to achieve the harmonisation of the training programmes and recognition was included in the European directive 96/29/Euratom which includes definition and specific tasks of the European Qualified Expert on Radiation Protection (RP). Basic syllabus for training of those experts was developed in the communication 98/C 133/03 concerning BSS applications. Although, in the Spanish education system, the training and recognition requirements of the high level qualified experts on RP was defined since 1977, until 2001, the figure of the Technical Qualified Expert on RP does not appear in the legal framework. In December 2002, a new regulation of the Spanish Regulatory Body, CSN, about qualifications to obtain the recognition of RP Expert in Spain (both high qualified and technical RP experts) was published. Concerning the qualified expert on RP, (RP Officer), responsible of the RP Service, which takes charge of the effective protection and advise radioactive and nuclear facilities in Rp aspects,has to be authorised by the regulatory body. to obtain the RP officer diploma, conceded by the CSN, an initial training of 300 hours and a three-year minimum experience are required (for X-ray installation a 6-month experience is enough). The technical qualified expert on RP is the worker who carried out the tasks in the a RP Service under the supervision of the RP officer. A Technician Qualified Expert on RP does not need an specific accreditation of the Regulatory Body, but an initial RP training and a three-month minimum experience are required and has hold a certificate by the RP officer. Continuous training is also required and as well has to receive a certificate from the RP officer. Since 1977, The Institute for energy Studies has been implementing specific training courses for those professionals who want to obtain the diploma of RP officer (high degree qualified RP expert), conceded by the CSN. Since then

  2. Calculating evidence-based renal replacement therapy - Introducing an excel-based calculator to improve prescribing and delivery in renal replacement therapy - A before and after study.

    Science.gov (United States)

    Cottle, Daniel; Mousdale, Stephen; Waqar-Uddin, Haroon; Tully, Redmond; Taylor, Benjamin

    2016-02-01

    Transferring the theoretical aspect of continuous renal replacement therapy to the bedside and delivering a given "dose" can be difficult. In research, the "dose" of renal replacement therapy is given as effluent flow rate in ml kg -1  h -1 . Unfortunately, most machines require other information when they are initiating therapy, including blood flow rate, pre-blood pump flow rate, dialysate flow rate, etc. This can lead to confusion, resulting in patients receiving inappropriate doses of renal replacement therapy. Our aim was to design an excel calculator which would personalise patient's treatment, deliver an effective, evidence-based dose of renal replacement therapy without large variations in practice and prolong filter life. Our calculator prescribes a haemodialfiltration dose of 25 ml kg -1  h -1 whilst limiting the filtration fraction to 15%. We compared the episodes of renal replacement therapy received by a historical group of patients, by retrieving their data stored on the haemofiltration machines, to a group where the calculator was used. In the second group, the data were gathered prospectively. The median delivered dose reduced from 41.0 ml kg -1  h -1 to 26.8 ml kg -1  h -1 with reduced variability that was significantly closer to the aim of 25 ml kg -1 .h -1 ( p  < 0.0001). The median treatment time increased from 8.5 h to 22.2 h ( p  = 0.00001). Our calculator significantly reduces variation in prescriptions of continuous veno-venous haemodiafiltration and provides an evidence-based dose. It is easy to use and provides personal care for patients whilst optimizing continuous veno-venous haemodiafiltration delivery and treatment times.

  3. Replacement of steam generators at arkansas nuclear one, unit-2 (ano-2)

    International Nuclear Information System (INIS)

    Wilson, R.M.; Buford, A.

    2001-01-01

    The Arkansas Nuclear One, Unit-2 steam generators, originally supplied by Combustion Engineering, began commercial operation in 1980 producing a gross electrical output of 958 MW. After several years of successful operation, the owner decided that the tube degradation rates of the original steam generators were too high for the plant to meet the performance requirements for the full 40-year license period. The contract to supply replacement steam generators (RSGs) was awarded to Westinghouse Electric Company in 1996. Installation of these RSGs took place in the last months of 2000. This paper compares the design features of the original and re-placement steam generators with emphasis on design and reliability enhancements achieved. (author)

  4. Replacing soybean meal with gelatin extracted from cow skin and corn protein concentrate as a protein source in broiler diets.

    Science.gov (United States)

    Khalaji, S; Manafi, M; Olfati, Z; Hedyati, M; Latifi, M; Veysi, A

    2016-02-01

    Two experiments were conducted to investigate the effects of replacing soybean meal with gelatin extracted from cow skin and corn protein concentrate as a protein source in broiler diets. Experiments were carried out as a completely randomized design where each experiment involved 4 treatments of 6 replicates and 10 chicks in each pen. Soybean meal proteins in a corn-soy control diet were replaced with 15, 30, and 45% of cow skin gelatin (CSG) or corn protein concentrate (CPC), respectively, in experiments 1 and 2. BW and cumulative feed intake were measured at 7, 21, and 42 d of age. Blood characteristics, relative organs weight and length, ileal digesta viscosity, ileal morphology, and cecal coliform and Salmonella population were measured at 42 d of age. Apparent total tract digestibility of protein was determined during 35 to 42 d of age. Replacement of soybean meal with CSG severely inhibited BW gain, decreased feed intake, and increased FCR in broilers during the experimental period (P ≤ 0.01). The inclusion of CPC reduced BW and increased FCR significantly (P ≤ 0.05) at 21 and 42 d of age without any consequence in feed intake. Protein digestibility was reduced and ileal digesta viscosity was increased linearly by increasing the amount of CSG and CPC in the control diet (P ≤ 0.01). Replacement of soybean meal with CSG and CPC did not significantly alter blood cell profile and plasma phosphorus, creatinine, blood urea nitrogen, Aspartate transaminase, and HDL and LDL cholesterol concentration. The inclusion of CSG linearly (P ≤ 0.05) increased plasma uric acid concentration and alkaline phosphatase activity. Triglyceride and cholesterol levels were decreased significantly (P ≤ 0.05) when the amount of CSG replacement was 15%. The results of this experiment showed that using CSG and CPC negatively affects broiler performance and therefore is not a suitable alternative to soybean meal in commercial diets. © 2015 Poultry Science Association Inc.

  5. Replacement value of poultry visceral offal meal in the diet of broiler ...

    African Journals Online (AJOL)

    An experiment was conducted to evaluate the replacement value of poultry visceral offal meal (PVOM) substituting for fish meal (FM) on an equal protein basis in the diets or unsexed Ross-strain broiler chickens from day-old to 8 weeks of age. One hundred and fifty birds were allotted in groups of 10 into 15 equidimeosional ...

  6. Repair and replacement of reactor internals for plant life extension

    International Nuclear Information System (INIS)

    Graae, T.

    1998-01-01

    Recent experience from early Swedish BWRs corroborate that all components in a nuclear power plant can be repaired or replaced with new ones. Oskarshamn 1 has gone through a thorough refurbishment project. A number of internals were repaired or replaced including the core shroud support which was welded to the bottom of the reactor pressure vessel. The project verifies that it is fully possible to carry out complicated inspection and repair work inside a nuclear pressure vessel which has been in operation for more than 20 years. Along with increased capacity factor, operating nuclear power plants get the financial conditions needed for extensive repair and modernization projects. Large power output leads to short pay-back times for the investments. The FENIX project at Oskarshamn 1 is such a project. There are utilities whose policy is to keep their plants in as-new condition for an unlimited length of time. (orig.)

  7. Evidence for replacement of an infected synthetic by a biological mesh in abdominal wall hernia repair

    Directory of Open Access Journals (Sweden)

    Agneta eMontgomery

    2016-01-01

    Full Text Available The incidence of deep infection using a synthetic mesh in inguinal hernia repair is low and reported to be well below 1%. This is in contrast to incisional hernia surgery where the reported incidence is 3% respective 13% comparing laparoscopic to open mesh repair reported in a Cochrane review. Main risk factors were long operation time, surgical site contamination and early wound complications. An infected mesh can be preserved using conservative treatment were negative pressure wound therapy (VAC® could play an important role. If strategy fails, the mesh needs to be removed. This review aims to look at evidence for situations were a biological mesh would work as a replacement of a removed infected synthetic mesh. Material and MethodsA literature search of the Medline database was performed using the PubMed search engine. Twenty publications were found relevant for this review.ResultsFor studies reviewed three options are presented: removal of the infected synthetic mesh alone, replacement with either a new synthetic or a new biological mesh. Operations were all performed at specialist centers. Removal of the mesh alone was an option limited to inguinal hernias. In ventral/incisional hernias the use of a biological mesh for replacement resulted in a very high recurrence rate, if bridging was required. Either a synthetic or a biological mesh seems to work as a replacement when fascial closure can be achieved. Evidence is though very low. ConclusionWhen required, either a synthetic or a biological meshes seems to work as a replacement for an infected synthetic mesh if the defect can be closed. It is however not recommended to use a biological mesh for bridging. Mesh replacement surgery is demanding and is recommended to be performed in a specialist center.

  8. Long-Term Mortality Effect of Early Pacemaker Implantation After Surgical Aortic Valve Replacement.

    Science.gov (United States)

    Greason, Kevin L; Lahr, Brian D; Stulak, John M; Cha, Yong-Mei; Rea, Robert F; Schaff, Hartzell V; Dearani, Joseph A

    2017-10-01

    The need for pacemaker implantation is a well-described complication of aortic valve replacement. Not so well described is the effect such an event has on long-term outcome. This study reviewed a 21-year experience at the Mayo Clinic (Rochester, Minnesota) with aortic valve replacement to understand the influence of early postoperative pacemaker implantation on long-term mortality rates more clearly. This study retrospectively reviewed the records of 5,842 patients without previous pacemaker implantation who underwent surgical aortic valve replacement from January 1993 through June 2014. The median age of these patients was 73 years (range, 65 to 79 years), the median ejection fraction was 62% (range, 53% to 68%), 3,853 patients were male (66%), and coronary artery bypass graft operation was performed in 2,553 (44%) of the patients studied. Early pacemaker implantation occurred in 146 patients (2.5%) within 30 days of surgical aortic valve replacement. The median follow-up of patients was 11.1 years (range, 5.8 to 16.5 years), and all-cause mortality rates were 2.4% at 30 days, 6.4% at 1 year, 23.1% at 5 years, 48.3% at 10 years, and 67.9% at 15 years postoperatively. Early pacemaker implantation was associated with an increased risk of death after multivariable adjustment for baseline patients' characteristics (hazard ratio, 1.49; 95% confidence interval, 1.20, 1.84; p pacemaker implantation as a complication of surgical aortic valve replacement is associated with an increased risk of long-term death. Valve replacement-related pacemaker implantation rates should be important considerations with respect to new valve replacement paradigms, especially in younger and lower-risk patients. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  9. Requirements for a Next Generation Framework: ATLAS Experience

    CERN Document Server

    Kama, Sami; The ATLAS collaboration

    2015-01-01

    The challenge faced by HEP experiments from the current and expected architectural evolution of CPUs and co-processors is how to successfully exploit concurrency and keep memory consumption within reasonable limits. This is a major change from frameworks which were designed for serial event processing on single core processors in the 2000s. ATLAS has recently considered this problem in some detail through its Future Frameworks Requirements group. Here we report on the major considerations of the group, which was charged with considering the best strategies to exploit current and anticipated CPU technologies. The group has re-examined the basic architecture of event processing and considered how the building blocks of a framework (algorithms, services, tools and incidents) should evolve. The group has also had to take special care to ensure that the use cases of the ATLAS high level trigger are encompassed, which differ in important ways from offline event processing (for example, 99% of events are rejected, w...

  10. Midflexion instability in primary total knee replacement: a review

    Directory of Open Access Journals (Sweden)

    Ramappa Manjunath

    2015-01-01

    Full Text Available Introduction: Midflexion instability in primary total knee replacement (TKR is an evolving concept. Successful treatment of instability requires an understanding of the different types of instability. Methods: A literature review was performed to identify information pertinent to midflexion instability in primary total knee replacement, utilising PRISMA guidelines. Databases searched included Embase, Medline, All of the Cochrane Library, PubMed and cross references. Results: Three factors, i.e., elevated joint line, multiradii femoral component and medial collateral ligament (MCL laxity, were identified to influence midflexion instability. Literature suggested mediolateral instability at 30–60° of flexion as diagnostic of midflexion instability. Literature search also revealed paucity in clinical studies analysing midflexion instability. Most of the evidence was obtained from cadaveric studies for elevated joint line and MCL laxity. Clinical studies on multiradii femoral component were limited by their small study size and early followup period. Conclusion: Elevated joint line, multiradii femoral component and MCL laxity have been suggested to cause midflexion laxity in primary TKR. Due to limitations in available evidence, this review was unable to raise the strength of overall evidence. Future well-designed clinical studies are essential to make definitive conclusions. This review serves as a baseline for future researchers and creates awareness for routine assessment of midflexion instability in primary total knee replacement.

  11. Meal replacements as a weight loss tool in a population with severe mental illness.

    Science.gov (United States)

    Gelberg, Hollie A; Kwan, Crystal L; Mena, Shirley J; Erickson, Zachary D; Baker, Matthew R; Chamberlin, Valery; Nguyen, Charles; Rosen, Jennifer A; Shah, Chandresh; Ames, Donna

    2015-12-01

    Weight gain and worsening metabolic parameters are often side effects of antipsychotic medications used by individuals with severe mental illness. To address this, a randomized, controlled research study of a behavioral weight management program for individuals with severe mental illness was undertaken to assess its efficacy. Patients unable to meet weight loss goals during the first portion of the year-long study were given the option of using meal replacement shakes in an effort to assist with weight loss. Specific requirements for use of meal replacement shakes were specified in the study protocol; only five patients were able to use the shakes in accordance with the protocol and lose weight while improving metabolic parameters. Case studies of two subjects are presented, illustrating the challenges and obstacles they faced, as well as their successes. Taking responsibility for their own weight loss, remaining motivated through the end of the study, and incorporating the meal replacement shakes into a daily routine were factors found in common with these patients. Use of meal replacements shakes with this population may be effective. Published by Elsevier Ltd.

  12. Knee Replacement

    Science.gov (United States)

    ... days. Medications prescribed by your doctor should help control pain. During the hospital stay, you'll be encouraged to move your ... exercise your new knee. After you leave the hospital, you'll continue physical ... mobility and a better quality of life. And most knee replacements can be ...

  13. Comparison between major repair and replacement options for a bridge deck life cycle assessment: A case study

    Directory of Open Access Journals (Sweden)

    Abu Dabous Saleh

    2017-01-01

    Full Text Available Material production, manufacturing, transportation, usage, and end of lifeprocessing are usually the main contributors defining the life cycle assessment (LCA. Bridge infrastructure is important to the economy and the society. Over their life cycle, highway bridges experience several stressors that can significantly affect their structural performance and therefore require rehabilitation. This paper discusses the life cycle analysis of bridge rehabilitation decisions and demonstrates the analysis with a case study of a bridge located in Ontario, Canada. The LCA of the bridge deck is analyzed for two rehabilitation strategies: major repair and replacement. The study focuses on evaluating the different life cycle phases of the bridge deck by assessing their carbon dioxide emission, energy consumption and cost. Also, the paper presents the impact of the different elements within each phase to identify the most contributing elements. The LCA of the bridge deck is analyzed and estimated with the aid of CES EduPack 2016 software that includes a database of more than 4000 different materials and more than 200 manufacturing processes. Analysis of the case study shows that material phase causes significant life cycle impact. The study concluded that the deck replacement yields higher environmental impact and life cycle cost compared to repairing and strengthening the deck.

  14. Circular waveguide systems for electron-cyclotron-resonant heating of the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Felker, B.; Calderon, M.O.; Chargin, A.K.

    1983-01-01

    Extensive use of electron cyclotron resonant heating (ECRH) in the Tandem Mirror Experiment-Upgrade (TMX-U) requires continuous development of components to improve efficiency, increase reliability, and deliver power to new locations with respect to the plasma. We have used rectangular waveguide components on the experiment and have developed, tested, and installed circular waveguide components. We replaced the rectangular with the circular components because of the greater transmission efficiency and power-handling capability of the circular ones. Design, fabrication, and testing of all components are complete for all systems. In this paper we describe the design criteria for the system

  15. 30 CFR 75.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 75.1438 Section 75.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... attachment replacement. Wire rope attachments shall be replaced when cracked, deformed, or excessively worn. ...

  16. Bridging experiments, models and simulations

    DEFF Research Database (Denmark)

    Carusi, Annamaria; Burrage, Kevin; Rodríguez, Blanca

    2012-01-01

    Computational models in physiology often integrate functional and structural information from a large range of spatiotemporal scales from the ionic to the whole organ level. Their sophistication raises both expectations and skepticism concerning how computational methods can improve our...... understanding of living organisms and also how they can reduce, replace, and refine animal experiments. A fundamental requirement to fulfill these expectations and achieve the full potential of computational physiology is a clear understanding of what models represent and how they can be validated. The present...... that contributes to defining the specific aspects of cardiac electrophysiology the MSE system targets, rather than being only an external test, and that this is driven by advances in experimental and computational methods and the combination of both....

  17. Effect of replacing nitrogen with helium on a closed cycle diesel engine performance

    Directory of Open Access Journals (Sweden)

    Alaa M. Abo El Ela

    2016-09-01

    Full Text Available One of most important problems of closed cycle diesel engine is deterioration of cylinder pressure and consequently the engine power. Therefore this research aimed to establish a multi zone model using Computational Fluid Dynamic (CFD code; ANSYS Fluent 14.0 to enhance the closed cycle diesel engine performance. The present work investigates the effect of replacing nitrogen gas with helium gas in different concentration under different engine load and equivalence ratios. The numerical model results were validated with comparing them with those obtained from the previous experimental results. The engine which was used for the simulation analysis and the previous experimental work was a single cylinder with a displacement volume of 825 cm3, compression ratio of 17 and run at constant speed of 1500 RPM. The numerical results showed that replacing nitrogen with helium resulted in increasing the in-cylinder pressure. The results showed also that a percentage of 0.5–10% of helium on mass basis is sufficient in the recovery needed to overcome the drop in-cylinder pressure and hence power due to the existence of CO2 in the recycled gas up to 25%. When the CO2 % reaches 25%, it is required to use at least 10% of He as replacement gas to achieve the required recovery.

  18. 30 CFR 57.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 57.19028 Section 57.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Hoisting Wire Ropes § 57.19028 End attachment replacement. Wire rope attachments shall be replaced when...

  19. 30 CFR 56.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 56.19028 Section 56.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Wire Ropes § 56.19028 End attachment replacement. Wire rope attachments shall be replaced when cracked...

  20. 30 CFR 77.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 77.1438 Section 77.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... Personnel Hoisting Wire Ropes § 77.1438 End attachment replacement. Wire rope attachments shall be replaced...

  1. Pharmacology Experiments on the Computer.

    Science.gov (United States)

    Keller, Daniel

    1990-01-01

    A computer program that replaces a set of pharmacology and physiology laboratory experiments on live animals or isolated organs is described and illustrated. Five experiments are simulated: dose-effect relationships on smooth muscle, blood pressure and catecholamines, neuromuscular signal transmission, acetylcholine and the circulation, and…

  2. Earlier Pulmonary Valve Replacement in Down Syndrome Patients Following Tetralogy of Fallot Repair.

    Science.gov (United States)

    Sullivan, Rachel T; Frommelt, Peter C; Hill, Garick D

    2017-08-01

    The association between Down syndrome and pulmonary hypertension could contribute to more severe pulmonary regurgitation after tetralogy of Fallot repair and possibly earlier pulmonary valve replacement. We compared cardiac magnetic resonance measures of pulmonary regurgitation and right ventricular dilation as well as timing of pulmonary valve replacement between those with and without Down syndrome after tetralogy of Fallot repair. Review of our surgical database from 2000 to 2015 identified patients with tetralogy of Fallot with pulmonary stenosis. Those with Down syndrome were compared to those without. The primary outcome of interest was time from repair to pulmonary valve replacement. Secondary outcomes included pulmonary regurgitation and indexed right ventricular volume on cardiac magnetic resonance imaging. The cohort of 284 patients included 35 (12%) with Down syndrome. Transannular patch repair was performed in 210 (74%). Down syndrome showed greater degree of pulmonary regurgitation (55 ± 14 vs. 37 ± 16%, p = 0.01) without a significantly greater rate of right ventricular dilation (p = 0.09). In multivariable analysis, Down syndrome (HR 2.3, 95% CI 1.2-4.5, p = 0.02) and transannular patch repair (HR 5.5, 95% CI 1.7-17.6, p = 0.004) were significant risk factors for valve replacement. Those with Down syndrome had significantly lower freedom from valve replacement (p = 0.03). Down syndrome is associated with an increased degree of pulmonary regurgitation and earlier pulmonary valve replacement after tetralogy of Fallot repair. These patients require earlier assessment by cardiac magnetic resonance imaging to determine timing of pulmonary valve replacement and evaluation for and treatment of preventable causes of pulmonary hypertension.

  3. Use of Renal Replacement Therapy May Influence Graft Outcomes following Liver Transplantation for Acute Liver Failure: A Propensity-Score Matched Population-Based Retrospective Cohort Study.

    Science.gov (United States)

    Knight, Stephen R; Oniscu, Gabriel C; Devey, Luke; Simpson, Kenneth J; Wigmore, Stephen J; Harrison, Ewen M

    2016-01-01

    Acute kidney injury is associated with a poor prognosis in acute liver failure but little is known of outcomes in patients undergoing transplantation for acute liver failure who require renal replacement therapy. A retrospective analysis of the United Kingdom Transplant Registry was performed (1 January 2001-31 December 2011) with patient and graft survival determined using Kaplan-Meier methods. Cox proportional hazards models were used together with propensity-score based full matching on renal replacement therapy use. Three-year patient and graft survival for patients receiving renal replacement therapy were 77.7% and 72.6% compared with 85.1% and 79.4% for those not requiring renal replacement therapy (Prenal replacement therapy was a predictor of both patient death (hazard ratio (HR) 1.59, 95% CI 1.01-2.50, P = 0.044) but not graft loss (HR 1.39, 95% CI 0.92-2.10, P = 0.114). In groups fully matched on baseline covariates, those not receiving renal replacement therapy with a serum creatinine greater than 175 μmol/L had a significantly worse risk of graft failure than those receiving renal replacement therapy. In patients being transplanted for acute liver failure, use of renal replacement therapy is a strong predictor of patient death and graft loss. Those not receiving renal replacement therapy with an elevated serum creatinine may be at greater risk of early graft failure than those receiving renal replacement therapy. A low threshold for instituting renal replacement therapy may therefore be beneficial.

  4. Efficient four fragment cloning for the construction of vectors for targeted gene replacement in filamentous fungi

    DEFF Research Database (Denmark)

    Frandsen, Rasmus John Normand; Andersson, Jens A.; Kristensen, Matilde Bylov

    2008-01-01

    Background: The rapid increase in whole genome fungal sequence information allows large scale functional analyses of target genes. Efficient transformation methods to obtain site-directed gene replacement, targeted over-expression by promoter replacement, in-frame epitope tagging or fusion...... of coding sequences with fluorescent markers such as GFP are essential for this process. Construction of vectors for these experiments depends on the directional cloning of two homologous recombination sequences on each side of a selection marker gene. Results: Here, we present a USER Friendly cloning based...

  5. Animal-Friendly Affinity Reagents: Replacing the Needless in the Haystack.

    Science.gov (United States)

    Gray, A C; Sidhu, S S; Chandrasekera, P C; Hendriksen, C F M; Borrebaeck, C A K

    2016-12-01

    The multibillion-dollar global antibody industry produces an indispensable resource but that is generated using millions of animals. Despite the irrefutable maturation and availability of animal-friendly affinity reagents (AFAs) employing naïve B lymphocyte or synthetic recombinant technologies expressed by phage display, animal immunisation is still authorised for antibody production. Remarkably, replacement opportunities have been overlooked, despite the enormous potential reduction in animal use. Directive 2010/63/EU requires that animals are not used where alternatives exist. To ensure its implementation, we have engaged in discussions with the EU Reference Laboratory for alternatives to animal testing (EURL ECVAM) and the Directorate General for Environment to carve out an EU-led replacement strategy. Measures must be imposed to avoid outsourcing, regulate commercial production, and ensure that antibody producers are fully supported. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  6. Autogenous tooth transplantation for replacing a lost tooth: case reports

    Directory of Open Access Journals (Sweden)

    Ji-Youn Kang

    2013-02-01

    Full Text Available The autogenous tooth transplantation is an alternative treatment replacing a missing tooth when a suitable donor tooth is available. It is also a successful treatment option to save significant amount of time and cost comparing implants or conventional prosthetics. These cases, which required single tooth extraction due to deep caries and severe periodontal disease, could have good results by transplanting non-functional but sound donor tooth to the extraction site.

  7. The development and manufacture of size for size feeder pipe for feeder replacement

    International Nuclear Information System (INIS)

    Legate, G.; Schreiter, D.; Townley, N.

    2008-01-01

    The recently recognised problem of feeder pipe thinning created a unique sourcing problem. Operators require relatively small quantities of nuclear class 1 seamless feeder pipe for such replacement which prior to the introduction of this product in 2006 was not available. It was desired that the pipe be produced at the exact size of the pipe currently in use at the specific reactor site (feeder pipe size varies from site to site). Secondly the pipe had to be made in conformance to the original code year of issue and to conform to the intent of the original material specifications. Finally a supply strategy had to be implemented allowing for timely manufacture of replacement piping. This presentation will report upon how replacement size for size feeder tube was developed and is currently manufactured at Nu-Tech Precision Metals. The paper will also detail the current supply strategy to ensure timely manufacture of the product.

  8. Opportunistic replacement of fusion power system parts

    International Nuclear Information System (INIS)

    Day, J.A.; George, L.L.

    1981-01-01

    This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits

  9. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE's long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: (1) Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. (2) Provide backup power to the critical ATR loads in the event of a loss of commercial power. (3) Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: (1) Evaluation Criteria No.2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. (2) Evaluation Criteria No.3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary

  10. Risks of hip and knee replacement

    Science.gov (United States)

    ... is normal to lose blood during and after hip or knee replacement surgery. Some people need a ... clot form are higher during and soon after hip or knee replacement surgery. Sitting or lying down ...

  11. Skilled nursing facilities after joint replacement

    Science.gov (United States)

    ... care providers in the weeks before your joint replacement. They can advise you about whether going directly ... of many people who have had a joint replacement? Can they tell you how many? A good ...

  12. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel's capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007. Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE's long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the

  13. The use of transcatheter aortic valve replacement vs surgical aortic valve replacement for the treatment of aortic stenosis

    Directory of Open Access Journals (Sweden)

    Jensen HA

    2015-08-01

    Full Text Available Hanna A Jensen, Lillian L Tsai, Vinod H Thourani Division of Cardiothoracic Surgery, Joseph B Whitehead Department of Surgery, Structural Heart and Valve Center, Emory University School of Medicine, Atlanta, GA, USA Abstract: Severe aortic stenosis (AS is associated with considerable morbidity and mortality and is increasing in prevalence as the global population increases. Since AS primarily affects the elderly, many of these patients have comorbidities that make them poor candidates for the gold standard treatment for AS, surgical aortic valve replacement. Transcatheter aortic valve replacement has emerged as a novel technology for the management of AS in higher risk patients over the past decade. Randomized trials have established the safety and efficacy of transcatheter aortic valve replacement, and the medical community has rallied to identify the patients who are most suitable for this transformative treatment. This review focuses on outlining the key procedural differences, describing the unique challenges of both operations, and finally assessing and comparing outcomes both on a general level and in challenging patient subgroups. Keywords: aortic valve replacement, transcatheter aortic valve replacement, surgical aortic valve replacement 

  14. Tokamak Fusion Core Experiment (TFCX) special-purpose remote maintenance systems

    International Nuclear Information System (INIS)

    Masson, L.S.; Welland, H.J.

    1985-01-01

    A key element in the preconceptual design of the Tokamak Fusion Core Experiment (TFCX) was the development of design concepts for special-purpose remote maintenance systems. Included were systems for shield sector replacement, vacuum vessel sector and toroidal field coil replacement, limiter blade replacement, protective tile replacement, and general-purpose maintenance. This paper addresses these systems as they apply to the copper toroidal field (TF) coil version of the TFCX

  15. Long-life slab replacement concrete : [summary].

    Science.gov (United States)

    2015-04-01

    Concrete slab replacement projects in Florida have demonstrated a high incidence of : replacement slab cracking. Causes of cracking have not been reliably determined. University of South Florida researchers : sought to identify the factors or : param...

  16. Serum lactate level and mortality in metformin-associated lactic acidosis requiring renal replacement therapy: a systematic review of case reports and case series.

    Science.gov (United States)

    Yeh, Hung-Chieh; Ting, I-Wen; Tsai, Ching-Wei; Wu, Jenn-Yu; Kuo, Chin-Chi

    2017-07-10

    The current practice concerning timing, mode, and dose of renal replacement therapy (RRT) in patients with metformin-associated lactic acidosis (MALA) with renal failure remains unknown. To investigate whether serum lactate level and prescription pattern of RRT are associated with mortality in patients with MALA requiring RRT. We searched PubMed/Medline and EMBASE from inception to Sep 2014 and applied predetermined exclusion criteria. Case-level data including case's demographics and clinical information related to MALA were abstracted. Multiple logistic regression modeling was used to examine the predictors of mortality. A total of 253 unique cases were identified with cumulative mortality of 17.2%. Eighty-seven percent of patients had acute kidney injury. Serum lactate level was significantly higher in non-survivors (median 22.5 mmol/L) than in survivors (17.0 mmol/L, p-value optimal prescription of RRT in MALA, we recommend fostering an international consortium to support prospective research and large-scale standardized case collection.

  17. Breakfast replacement with a low-glycaemic response liquid formula in patients with type 2 diabetes: a randomised clinical trial.

    Science.gov (United States)

    Stenvers, Dirk J; Schouten, Lydia J; Jurgens, Jordy; Endert, Erik; Kalsbeek, Andries; Fliers, Eric; Bisschop, Peter H

    2014-08-28

    Low-glycaemic index diets reduce glycated Hb (HbA1c) in patients with type 2 diabetes, but require intensive dietary support. Using a liquid meal replacement with a low glycaemic response (GR) may be an alternative dietary approach. In the present study, we investigated whether breakfast replacement with a low-GR liquid meal would reduce postprandial glycaemia and/or improve long-term glycaemia. In the present randomised, controlled, cross-over design, twenty patients with type 2 diabetes consumed either a breakfast replacement consisting of an isoenergetic amount of Glucerna SR or a free-choice breakfast for 3 months. Postprandial AUC levels were measured using continuous glucose measurement at home. After the 3-month dietary period, meal profiles and oral glucose tolerance were assessed in the clinical setting. The low-GR liquid meal replacement reduced the AUC of postprandial glucose excursions at home compared with a free-choice control breakfast (estimated marginal mean 141 (95 % CI 114, 174) v. estimated marginal mean 259 (95 % CI 211, 318) mmol × min/l; P= 0·0002). The low-GR liquid meal replacement also reduced glucose AUC levels in the clinical setting compared with an isoenergetic control breakfast (low GR: median 97 (interquartile range (IQR) 60-188) mmol × min/l; control: median 253 (IQR 162-386) mmol × min/l; Pmeal replacement did not affect fasting plasma glucose, HbA1c or lipid levels, and even slightly reduced oral glucose tolerance. In conclusion, the low-GR liquid meal replacement is a potential dietary approach to reduce postprandial glycaemia in patients with type 2 diabetes. However, clinical trials into the effects of replacing multiple meals on long-term glycaemia in poorly controlled patients are required before a low-GR liquid meal replacement can be adopted as a dietary approach to the treatment of type 2 diabetes.

  18. Hip or knee replacement - in the hospital after

    Science.gov (United States)

    Hip replacement surgery - after - self-care; Knee replacement surgery - after - self-care ... taking walks in the hallways with help. After knee replacement, some surgeons recommend using a continuous passive ...

  19. Strategy to safety grade systems replacements

    International Nuclear Information System (INIS)

    Stimler, M.; Sullivan, K.E.; Trebincevic, I.

    1993-01-01

    The introduction of digital instrumentation and control systems in nuclear power plants is characterized by the need to satisfy the requirements of safety, reliability and man-machine ergonomics. Today digital instrumentation and control systems meet these requirements and the trend in Europe is towards full digital based nuclear power plant control systems. This paper describes Siemens (KWU) experience in nuclear power plants and development in trends within Europe. Topics which are the subject of major concern to NPP operators addressed in this paper are: human performance factors - man-machine interface; operating philosophy; safety, availability and reliability. Other aspects addressed are: Siemens open-quotes defense in depthclose quotes concept, description of Siemens digital I ampersand C systems, safety requirements and systems, I ampersand C qualification, control room ergonomics, information systems and retrofitting experience

  20. Optimizing renewable energy, demand response and energy storage to replace conventional fuels in Ontario, Canada

    International Nuclear Information System (INIS)

    Richardson, David B.; Harvey, L.D. Danny

    2015-01-01

    Electricity systems with high penetrations of renewable energy require a mix of resources to balance supply with demand, and to maintain safe levels of system reliability. A load balancing methodology is developed to determine the optimal lowest-cost mix of renewable energy resources, demand response, and energy storage to replace conventional fuels in the Province of Ontario, Canada. Three successive cumulative scenarios are considered: the displacement of fossil fuel generation, the planned retirement of an existing nuclear reactor, and the electrification of the passenger vehicle fleet. The results show that each of these scenarios is achievable with energy generation costs that are not out of line with current and projected electricity generation costs. These transitions, especially that which proposes the electrification of the vehicle fleet, require significant investment in new generation, with installed capacities much higher than that of the current system. Transitions to mainly renewable energy systems require changes in our conceptualization of, and approach to, energy system planning. - Highlights: • Model three scenarios to replace conventional fuels with renewables, storage and DR (demand response). • Determine optimal low-cost mix of resources for each scenario. • Scenarios require much higher installed capacities than current system. • Energy transitions require changes in approach to energy system planning.

  1. Replacing a failed mini-implant with a miniplate to prevent interruption during orthodontic treatment.

    Science.gov (United States)

    Lee, Jin-Hwa; Choo, Hyeran; Kim, Seong-Hun; Chung, Kyu-Rhim; Giannuzzi, Lucille A; Ngan, Peter

    2011-06-01

    When mini-implants fail during orthodontic treatment, there is a need to have a backup plan to either replace the failed implant in the adjacent interradicular area or wait for the bone to heal before replacing the mini-implant. We propose a novel way to overcome this problem by replacement with a miniplate so as not to interrupt treatment or prolong treatment time. The indications, advantages, efficacy, and procedures for switching from a mini-implant to a miniplate are discussed. Two patients who required replacement of failed mini-implants are presented. In the first patient, because of the proximity of the buccal vestibule to the mini-implant, it was decided to replace the failed mini-implant by an I-shaped C-tube miniplate. In the second patient, radiolucencies were found around the failed mini-implants, making the adjacent alveolar bone unavailable for immediate placement of another mini-implant. In addition, the maxillary sinus pneumatization was expanded deeply into the interradicular spaces; this further mandated an alternative placement site. One failed mini-implant was examined under a scanning electron microscope for bone attachment. Treatment was completed in both patients after replacement with miniplates without interrupting the treatment mechanics or prolonging the treatments. Examination under the scanning electron microscope showed partial bone growth into the coating pores and titanium substrate interface even after thorough cleaning and sterilization. Replacement with a miniplate is a viable solution for failed mini-implants during orthodontic treatment. The results from microscopic evaluation of the failed mini-implant suggest that stringent guidelines are needed for recycling used mini-implants. Copyright © 2011 American Association of Orthodontists. Published by Mosby, Inc. All rights reserved.

  2. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  3. Hormone Replacement Therapy and Your Heart

    Science.gov (United States)

    Hormone replacement therapy and your heart Are you taking — or considering — hormone therapy to treat bothersome menopausal symptoms? Understand ... you. By Mayo Clinic Staff Long-term hormone replacement therapy used to be routinely prescribed for postmenopausal ...

  4. Classification of baseline toxicants for QSAR predictions to replace fish acute toxicity studies.

    Science.gov (United States)

    Nendza, Monika; Müller, Martin; Wenzel, Andrea

    2017-03-22

    Fish acute toxicity studies are required for environmental hazard and risk assessment of chemicals by national and international legislations such as REACH, the regulations of plant protection products and biocidal products, or the GHS (globally harmonised system) for classification and labelling of chemicals. Alternative methods like QSARs (quantitative structure-activity relationships) can replace many ecotoxicity tests. However, complete substitution of in vivo animal tests by in silico methods may not be realistic. For the so-called baseline toxicants, it is possible to predict the fish acute toxicity with sufficient accuracy from log K ow and, hence, valid QSARs can replace in vivo testing. In contrast, excess toxicants and chemicals not reliably classified as baseline toxicants require further in silico, in vitro or in vivo assessments. Thus, the critical task is to discriminate between baseline and excess toxicants. For fish acute toxicity, we derived a scheme based on structural alerts and physicochemical property thresholds to classify chemicals as either baseline toxicants (=predictable by QSARs) or as potential excess toxicants (=not predictable by baseline QSARs). The step-wise approach identifies baseline toxicants (true negatives) in a precautionary way to avoid false negative predictions. Therefore, a certain fraction of false positives can be tolerated, i.e. baseline toxicants without specific effects that may be tested instead of predicted. Application of the classification scheme to a new heterogeneous dataset for diverse fish species results in 40% baseline toxicants, 24% excess toxicants and 36% compounds not classified. Thus, we can conclude that replacing about half of the fish acute toxicity tests by QSAR predictions is realistic to be achieved in the short-term. The long-term goals are classification criteria also for further groups of toxicants and to replace as many in vivo fish acute toxicity tests as possible with valid QSAR

  5. New one cycle criteria for optimizing preventive replacement policies

    International Nuclear Information System (INIS)

    Hamidi, Maryam; Szidarovszky, Ferenc; Szidarovszky, Miklos

    2016-01-01

    Models are introduced and examined for the optimum scheduling of preventive replacements. The “replace first” and “replace last” models are known from the literature if the long term expected cost per unit time is minimized. We will first introduce the one cycle counterparts of these models when the expected costs per unit time in a single cycle is minimized. If the unit performs identical projects sequentially then the “replace next” model assumes that the preventive replacement is postponed until the ongoing project is finished. The termination time of this project is random which also depends on the scheduled time of the preventive replacement in contrary to the “replace first” and “replace last” models. The mathematical models are formulated and conditions are given for the existence of finite optima. Numerical examples and a simulation study illustrate the methodology and the numerical results show interesting comparisons of the different models. - Highlights: • The Single cycle age replacement model is extended incorporating repairable failures. • In order to avoid project interruption costs, three model variants are discussed. • Model variants are replace first, replace last and replace next. • In many cases analytic solutions are derived and illustrated by numerical examples. • The different model variants and their results are compared based on simulation studies.

  6. Replacement Saltwell Pumping System Document Bibliography

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document bibliography is prepared to identify engineering documentation developed during the design of the Replacement Saltwell Pumping System. The bibliography includes all engineering supporting documents and correspondence prepared prior to the deployment of the system in the field. All documents referenced are available electronically through the Records Management Information System (RMIS). Major components of the Replacement Saltwell Pumping System include the Sundyne Canned Motor Pump, the Water Filter Skid, the Injection Water Skid and the Backflow Preventer Assembly. Drawing H-14-104498 provides an index of drawings (fabrication details, PandIDs, etc.) prepared to support development of the Replacement Saltwell Pumping System. Specific information pertaining to new equipment can be found in Certified Vendor Information (CVI) File 50124. This CVI file has been established specifically for new equipment associated with the Replacement Saltwell Pumping System

  7. Experiences with a researcher-centric ELN.

    Science.gov (United States)

    Badiola, Katrina A; Bird, Colin; Brocklesby, William S; Casson, John; Chapman, Richard T; Coles, Simon J; Cronshaw, James R; Fisher, Adam; Frey, Jeremy G; Gloria, Danmar; Grossel, Martin C; Hibbert, D Brynn; Knight, Nicola; Mapp, Lucy K; Marazzi, Luke; Matthews, Brian; Milsted, Andy; Minns, Russell S; Mueller, Karl T; Murphy, Kelly; Parkinson, Tim; Quinnell, Rosanne; Robinson, John S; Robertson, Murray N; Robins, Michael; Springate, Emma; Tizzard, Graham; Todd, Matthew H; Williamson, Alice E; Willoughby, Cerys; Yang, Erica; Ylioja, Paul M

    2015-03-01

    Electronic Laboratory Notebooks (ELNs) are progressively replacing traditional paper books in both commercial research establishments and academic institutions. University researchers require specific features from ELNs, given the need to promote cross-institutional collaborative working, to enable the sharing of procedures and results, and to facilitate publication. The LabTrove ELN, which we use as our exemplar, was designed to be researcher-centric ( i.e. , not only aimed at the individual researcher's basic needs rather than to a specific institutional or subject or disciplinary agenda, but also able to be tailored because it is open source). LabTrove is being used in a heterogeneous set of academic laboratories, for a range of purposes, including analytical chemistry, X-ray studies, drug discovery and a biomaterials project. Researchers use the ELN for recording experiments, preserving data collected, and for project coordination. This perspective article describes the experiences of those researchers from several viewpoints, demonstrating how a web-based open source electronic notebook can meet the diverse needs of academic researchers.

  8. The role of the posterior cruciate ligament in total knee replacement

    Science.gov (United States)

    Ritter, M. A.; Davis, K. E.; Meding, J. B.; Farris, A.

    2012-01-01

    Objectives The purpose of this study was to examine the effect of posterior cruciate ligament (PCL) retention, PCL recession, and PCL excision during cruciate-retaining total knee replacement. Methods A total of 3018 anatomic graduated component total knee replacements were examined; 1846 of these retained the PCL, 455 PCLs were partially recessed, and in 717 the PCL was completely excised from the back of the tibia. Results Clinical scores between PCL groups favored excision for flexion (p knees, 98.2% for recessed knees, and 96.4% for excised knees (p = 0.0934, Wilcoxon; p = 0.0202, log-rank). Conclusions Despite some trade off in clinical performance, if the PCL is detached at the time of operation, conversion to a posterior-stabilised prosthesis may not be necessarily required as long as stability in the anteroposterior and coronal planes is achieved. PMID:23610673

  9. An evaluation of information on the internet about a new device: the cervical artificial disc replacement.

    Science.gov (United States)

    Qureshi, Sheeraz A; Koehler, Steven M; Lin, James D; Bird, Justin; Garcia, Ryan M; Hecht, Andrew C

    2012-05-01

    Cross-sectional survey. The objective of this study was to investigate the authorship, content, and quality of information available to the public on the Internet pertaining to the cervical artificial disc replacement device. The Internet is widely used by patients as an educational tool for health care information. In addition, the Internet is used as a medium for direct-to-consumer marketing. Increasing interest in cervical artificial disc replacement has led to the emergence of numerous Web sites offering information about this procedure. It is thought that patients can be influenced by information found on the Internet. A cross section of Web sites accessible to the general public was surveyed. Three commonly used search engines were used to locate 150 (50/search engine) Web sites providing information about the cervical artificial disc replacement. Each Web site was evaluated with regard to authorship and content. Fifty-three percent of the Web sites reviewed were authorized by a private physician group, 4% by an academic physician group, 13% by industry, 16% were news reports, and 14% were not otherwise categorized. Sixty-five percent of Web sites offered a mechanism for direct contact and 19% provided clear patient eligibility criteria. Benefits were expressed in 80% of Web sites, whereas associated risks were described in 35% or less. European experiences were noted in 17% of Web sites, whereas only 9% of Web sites detailed the current US experience. CONCLUSION.: The results of this study demonstrate that much of the content of the Internet-derived information pertaining to the cervical artificial disc replacement is for marketing purposes and may not represent unbiased information. Until we can confirm the content on a Web site to be accurate, patients should be cautioned when using the Internet as a source for health care information related to cervical disc replacement.

  10. Knee joint replacement

    Science.gov (United States)

    ... to make everyday tasks easier. Practice using a cane, walker , crutches , or a wheelchair correctly. On the ... ask your doctor Knee joint replacement - discharge Preventing falls Preventing falls - what to ask your doctor Surgical ...

  11. Limited versus full sternotomy for aortic valve replacement.

    Science.gov (United States)

    Kirmani, Bilal H; Jones, Sion G; Malaisrie, S C; Chung, Darryl A; Williams, Richard Jnn

    2017-04-10

    Aortic valve disease is a common condition that is easily treatable with cardiac surgery. This is conventionally performed by opening the sternum longitudinally down the centre ("median sternotomy") and replacing the valve under cardiopulmonary bypass. Median sternotomy is generally well tolerated, but as less invasive options have become available, the efficacy of limited incisions has been called into question. In particular, the effects of reducing the visibility and surgical access has raised safety concerns with regards to the placement of cannulae, venting of the heart, epicardial wire placement, and de-airing of the heart at the end of the procedure. These difficulties may increase operating times, affecting outcome. The benefits of smaller incisions are thought to include decreased pain; improved respiratory mechanics; reductions in wound infections, bleeding, and need for transfusion; shorter intensive care stay; better cosmesis; and a quicker return to normal activity. To assess the effects of minimally invasive aortic valve replacement via a limited sternotomy versus conventional aortic valve replacement via median sternotomy in people with aortic valve disease requiring surgical replacement. We performed searches of CENTRAL, MEDLINE, Embase, clinical trials registries, and manufacturers' websites from inception to July 2016, with no language limitations. We reviewed references of identified papers to identify any further studies of relevance. Randomised controlled trials comparing aortic valve replacement via a median sternotomy versus aortic valve replacement via a limited sternotomy. We excluded trials that performed other minimally invasive incisions such as mini-thoracotomies, port access, trans-apical, trans-femoral or robotic procedures. Although some well-conducted prospective and retrospective case-control and cohort studies exist, these were not included in this review. Two review authors independently assessed trial papers to extract data

  12. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Science.gov (United States)

    D'Emic, Michael D; Whitlock, John A; Smith, Kathlyn M; Fisher, Daniel C; Wilson, Jeffrey A

    2013-01-01

    Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs.

  13. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Directory of Open Access Journals (Sweden)

    Michael D D'Emic

    Full Text Available BACKGROUND: Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. METHODOLOGY/PRINCIPAL FINDINGS: We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days. Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. CONCLUSIONS/SIGNIFICANCE: Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size, and derived titanosaurs and

  14. Nitrogen Fertilizer Replacement Value of Concentrated Liquid Fraction of Separated Pig Slurry Applied to Grassland

    NARCIS (Netherlands)

    Middelkoop, Van J.C.; Holshof, G.

    2017-01-01

    Seven grassland experiments on sandy and clay soils were performed during a period of 4 years to estimate the nitrogen (N) fertilizer replacement value (NFRV) of concentrated liquid fractions of separated pig slurry (mineral concentrate: MC). The risk of nitrate leaching when applying MC was

  15. Requirements model generation to support requirements elicitation: The Secure Tropos experience

    NARCIS (Netherlands)

    Kiyavitskaya, N.; Zannone, N.

    2008-01-01

    In recent years several efforts have been devoted by researchers in the Requirements Engineering community to the development of methodologies for supporting designers during requirements elicitation, modeling, and analysis. However, these methodologies often lack tool support to facilitate their

  16. 7 CFR 1944.659 - Replacement housing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Replacement housing. 1944.659 Section 1944.659 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) HOUSING Housing Preservation Grants § 1944.659 Replacement housing...

  17. The impact of changes in LVEF and renal function on the prognosis of ICD patients after elective device replacement.

    Science.gov (United States)

    Vandenberk, Bert; Robyns, Tomas; Garweg, Christophe; Floré, Vincent; Foulon, Stefaan; Voros, Gabor; Ector, Joris; Willems, Rik

    2017-10-01

    A proportion of patients with an implantable cardioverter-defibrillator (ICD) in prevention of sudden cardiac death will only receive their first appropriate ICD therapy (AT) after device replacement. Clinical reassessment at the time of replacement could be helpful to guide the decision to replace or not in the future. All patients with an ICD for primary or secondary prevention in ischemic (ICM) or nonischemic cardiomyopathy were included in a single-center retrospective registry. The association of changes in left ventricular ejection fraction (LVEF; cut-off at 35%), worsening renal function (decrease in estimated glomerular filtration rate > 15 mL/min), and worsening New York Heart Association class at elective device replacement with mortality and AT was analyzed using adjusted Cox regression analysis. A total of 238 (33%) out of 727 patients received elective device replacement (86.1% male, 74.4% ICM, 42.9% primary prevention). During this replacement 20.2% received a device upgrade. The mean time to replacement was 6.4 ± 2.0 years and mean follow-up after replacement was 3.4 ± 3.0 years. Of patients who did not receive AT before replacement 23.1% received their first AT after replacement. Worsening renal function (hazard ratio [HR] 2.79, 95% confidence interval [CI] 1.50-5.18) and a consistently LVEF ≤35% compared to a consistently LVEF >35% (HR 2.15, 95% CI 1.10-4.19) at the time of replacement were independent predictors of mortality. Independent predictors of first AT after replacement could not be identified. Although reassessment of LVEF and renal function at replacement can be helpful in predicting total mortality, the clinical utility to guide reimplantation seemed limited. Our experience indicates that approximately 25% of patients received their first AT only after replacement. © 2017 Wiley Periodicals, Inc.

  18. Can Clouds replace Grids? Will Clouds replace Grids?

    Energy Technology Data Exchange (ETDEWEB)

    Shiers, J D, E-mail: Jamie.Shiers@cern.c [CERN, 1211 Geneva 23 (Switzerland)

    2010-04-01

    The world's largest scientific machine - comprising dual 27km circular proton accelerators cooled to 1.9{sup o}K and located some 100m underground - currently relies on major production Grid infrastructures for the offline computing needs of the 4 main experiments that will take data at this facility. After many years of sometimes difficult preparation the computing service has been declared 'open' and ready to meet the challenges that will come shortly when the machine restarts in 2009. But the service is not without its problems: reliability - as seen by the experiments, as opposed to that measured by the official tools - still needs to be significantly improved. Prolonged downtimes or degradations of major services or even complete sites are still too common and the operational and coordination effort to keep the overall service running is probably not sustainable at this level. Recently 'Cloud Computing' - in terms of pay-per-use fabric provisioning - has emerged as a potentially viable alternative but with rather different strengths and no doubt weaknesses too. Based on the concrete needs of the LHC experiments - where the total data volume that will be acquired over the full lifetime of the project, including the additional data copies that are required by the Computing Models of the experiments, approaches 1 Exabyte - we analyze the pros and cons of Grids versus Clouds. This analysis covers not only technical issues - such as those related to demanding database and data management needs - but also sociological aspects, which cannot be ignored, neither in terms of funding nor in the wider context of the essential but often overlooked role of science in society, education and economy.

  19. Can Clouds replace Grids? Will Clouds replace Grids?

    International Nuclear Information System (INIS)

    Shiers, J D

    2010-01-01

    The world's largest scientific machine - comprising dual 27km circular proton accelerators cooled to 1.9 o K and located some 100m underground - currently relies on major production Grid infrastructures for the offline computing needs of the 4 main experiments that will take data at this facility. After many years of sometimes difficult preparation the computing service has been declared 'open' and ready to meet the challenges that will come shortly when the machine restarts in 2009. But the service is not without its problems: reliability - as seen by the experiments, as opposed to that measured by the official tools - still needs to be significantly improved. Prolonged downtimes or degradations of major services or even complete sites are still too common and the operational and coordination effort to keep the overall service running is probably not sustainable at this level. Recently 'Cloud Computing' - in terms of pay-per-use fabric provisioning - has emerged as a potentially viable alternative but with rather different strengths and no doubt weaknesses too. Based on the concrete needs of the LHC experiments - where the total data volume that will be acquired over the full lifetime of the project, including the additional data copies that are required by the Computing Models of the experiments, approaches 1 Exabyte - we analyze the pros and cons of Grids versus Clouds. This analysis covers not only technical issues - such as those related to demanding database and data management needs - but also sociological aspects, which cannot be ignored, neither in terms of funding nor in the wider context of the essential but often overlooked role of science in society, education and economy.

  20. Can Clouds replace Grids? Will Clouds replace Grids?

    Science.gov (United States)

    Shiers, J. D.

    2010-04-01

    The world's largest scientific machine - comprising dual 27km circular proton accelerators cooled to 1.9oK and located some 100m underground - currently relies on major production Grid infrastructures for the offline computing needs of the 4 main experiments that will take data at this facility. After many years of sometimes difficult preparation the computing service has been declared "open" and ready to meet the challenges that will come shortly when the machine restarts in 2009. But the service is not without its problems: reliability - as seen by the experiments, as opposed to that measured by the official tools - still needs to be significantly improved. Prolonged downtimes or degradations of major services or even complete sites are still too common and the operational and coordination effort to keep the overall service running is probably not sustainable at this level. Recently "Cloud Computing" - in terms of pay-per-use fabric provisioning - has emerged as a potentially viable alternative but with rather different strengths and no doubt weaknesses too. Based on the concrete needs of the LHC experiments - where the total data volume that will be acquired over the full lifetime of the project, including the additional data copies that are required by the Computing Models of the experiments, approaches 1 Exabyte - we analyze the pros and cons of Grids versus Clouds. This analysis covers not only technical issues - such as those related to demanding database and data management needs - but also sociological aspects, which cannot be ignored, neither in terms of funding nor in the wider context of the essential but often overlooked role of science in society, education and economy.

  1. NIF Laser Line Replaceable Units (LRUs)

    International Nuclear Information System (INIS)

    Larson, D W

    2003-01-01

    The National Ignition Facility (NIF) is designed with its high value optical systems in cassettes called Line Replaceable Units (LRUs). Virtually all of the NIF's active components are assembled in one of the ∼4000 electrical and optical LRUs that serve between two and eight of NIF's 192 laser beam lines. Many of these LRUs are optomechanical assemblies that are roughly the size of a telephone booth. The primary design challenges for this hardware include meeting stringent mechanical precision, stability and cleanliness requirements. Pre-production units of each LRU type have been fielded on the first bundle of NIF and used to demonstrate that NIF meets its performance objectives. This presentation provides an overview of the NIF LRUs, their design and production plans for building out the remaining NIF bundles

  2. New Firm Performance and the Replacement of Founder-CEOs

    DEFF Research Database (Denmark)

    Chen, Jing; Thompson, Peter

    2015-01-01

    We study the causes and consequences of the replacement of founder-CEOs in a sample of 4,172 Danish start-ups. We propose that founder-CEO replacement is driven in part by mismatches between business quality and founder ability. Our framework suggests that replacements are more likely among...... the worst- and best-performing firms, with low (high)-ability founders replaced by manager with higher (lower) ability. Replacement is not unambiguously associated with better subsequent performance. Firms that replaced the founder were much more likely to fail, but the surviving firms among them grew...

  3. Partial replacement of the feldspar waste of flat glass ceramics for masses in white

    International Nuclear Information System (INIS)

    Porto, V.S.; Araujo, A.M.B.; Morais, C.R.S.; Cavalcanti, M.S.L.

    2012-01-01

    In all the industrial production process requires the consumption of raw materials exaggerated the traditional scarcity of incurring the same. To reverse this situation, one of the possible actions is the search for alternative technologies that aim to replace these materials by waste that exhibit similar characteristics. This study aims to verify the possibility of partially replacing feldspar by waste flat glass ceramic mass for white, since this type of waste, when subjected to high temperatures can act as a flux. For this research, initially the raw materials were characterized using the techniques of energy dispersive spectroscopy X-ray (EDX) and X-ray diffraction. Then, test pieces were prepared to be burned at temperatures between 1000 and 1250 ° C, which were submitted to tests of porosity to absorb water. The results are within the standards required by the standards established for ceramic products, which confirms the feasibility of such waste to act as a flux in ceramic white masses. (author)

  4. Controversies in hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    A. Baziad

    2001-09-01

    Full Text Available Deficiency of estrogen hormone will result in either long-term or short-term health problems which may reduce the quality of life. There are numerous methods by which the quality of female life can be achieved. Since the problems occuring are due to the deficiency of estrogen hormone, the appropriate method to tackle the problem is by administration of estrogen hormone. The administration of hormone replacement therapy (HRT with estrogen may eliminate climacteric complaints, prevent osteoporosis, coronary heart disease, dementia, and colon cancer. Although HRT has a great deal of advantage, its use is still low and may result in controversies. These controversies are due to fact that both doctor and patient still hold on to the old, outmoded views which are not supported by numerous studies. Currently, the use of HRT is not only based on experience, or temporary observation, but more on evidence based medicine. (Med J Indones 2001; 10: 182-6Keywords: controversies, HRT

  5. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  6. COMPARING THE ENZYME REPLACEMENT THERAPY COST IN POST PANCREATECTOMY PATIENTS DUE TO PANCREATIC TUMOR AND CHRONIC PANCREATITIS.

    Science.gov (United States)

    Fragoso, Anna Victoria; Pedroso, Martha Regina; Herman, Paulo; Montagnini, André Luis

    2016-01-01

    Among late postoperative complications of pancreatectomy are the exocrine and endocrine pancreatic insufficiencies. The presence of exocrine pancreatic insufficiency imposes, as standard treatment, pancreatic enzyme replacement. Patients with chronic pancreatitis, with intractable pain or any complications with surgical treatment, are likely to present exocrine pancreatic insufficiency or have this condition worsened requiring adequate dose of pancreatic enzymes. The aim of this study is to compare the required dose of pancreatic enzyme and the enzyme replacement cost in post pancreatectomy patients with and without chronic pancreatitis. Observational cross-sectional study. In the first half of 2015 patients treated at the clinic of the Department of Gastrointestinal Surgery at Hospital das Clínicas, Universidade de São Paulo, Brazil, who underwent pancreatectomy for at least 6 months and in use of enzyme replacement therapy were included in this series. The study was approved by the Research Ethics Committee. The patients were divided into two groups according to the presence or absence of chronic pancreatitis prior to pancreatic surgery. For this study, Ptreatment was R$ 2150.5 ± 729.39; R$ 2118.18 ± 731.02 in patients without pancreatitis and R$ 2217.74 ± 736.30 in patients with pancreatitis. There was no statistically significant difference in the cost of treatment of enzyme replacement post pancreatectomy in patients with or without chronic pancreatitis prior to surgical indication.

  7. Recurrent pannus formation causing prosthetic aortic valve dysfunction: is excision without valve re-replacement applicable?

    Science.gov (United States)

    Darwazah, Ahmad K

    2012-06-29

    Prosthetic valve dysfunction at aortic position is commonly caused by pannus formation. The exact etiology is not known. It arises from ventricular aspect of the prosthesis encroaching its leaflets causing stenosis or it may remain localized causing left ventricular outflow tract obstruction without affecting valve function.The difference in location entails different approaches in management. Such a pathology requires surgical excision of the pannus with or without valve re-replacement.A recurrent pannus was observed in a female patient who needed repeated surgical intervention to excise a localized pannus without re-replacement of a well functioning prosthetic valve.Management of our case presents several questions, whether recurrence of pannus is caused by sparing the prosthetic valve, is it simply an exaggeration of an inflammatory healing process in certain individuals or is it ideal to re-replace the valve despite a well preserved function.

  8. Report on the meeting for examining replacing core

    International Nuclear Information System (INIS)

    1977-01-01

    At the time of examining the application for approval of reactor installation, it must be confirmed that the safety of the concerned reactor is secured with not only the initially loaded core but also the replacing core. Besides, it must be confirmed again that the various criteria concerning the safety are satisfied after the start of operation, because a part of the parameters of the replacing core is dependent on the operational history. On the above described viewpoints, the main parameters affecting the safety and the nuclear and thermal limits of replacing core were reviewed. Moreover, the contents of description concerning replacing core in the application form were examined. As the general matters concerning the safety of replacing core, the scram reactivity curves for BWRs and PWRs, the method of description in the application form concerning the fuel containing gadolinia, and the use of burnable poison in replacing core were examined. The meeting for examining replacing core was organized on September 20, 1976, at the Committee for Examining Reactor Safety, and this report was compiled as the results of 10 meetings. (Kako, I.)

  9. Replacement of wheat bran with spineless cactus (Opuntia ficus indica Mill cv Gigante) and urea in the diets of Holstein x Gyr heifers.

    Science.gov (United States)

    de Figueiredo Monteiro, Carolina Corrêa; Silva de Melo, Airon Aparecido; Ferreira, Marcelo Andrade; de Souza Campos, José Mauricio; Rodrigues Souza, Julyana Sena; Dos Santos Silva, Evannielly Thuanny; de Paula Xavier de Andrade, Rafael; da Silva, Emmanuelle Cordeiro

    2014-10-01

    The aim of this study was to evaluate the replacement effect of wheat bran with spineless cactus and urea in heifers. Twenty-four heifers with an average initial weight of 185 ± 13 kg were used in this experiment. Four levels of spineless cactus corrected with urea and ammonium sulfate (9:1) were studied: 0, 33, 66, and 100 % replacement with wheat bran. Samples of feed, orts, and feces were analyzed to estimate the intake and digestibility of dry matter (DM) and nutrients. Indigestible neutral detergent fiber was used as an internal marker. The experiment was conducted in a completely randomized design. Dry matter, neutral detergent fiber, and total digestible nutrient intake demonstrated a quadratic effect (P < 0.05). Rumen degradable protein intake increased linearly (P < 0.05). The maximum DM digestibility was estimated to be 0.67 with a 43 % replacement. Crude protein and NDF digestibility increased linearly (P < 0.05). The total body weight gain and average daily gain decreased linearly with the replacement. Thus, it is practical to replace wheat bran with spineless cactus containing urea and ammonium sulfate up to 66 % in sugar cane-based diets.

  10. Circadian variation in serum cortisol during hydrocortisone replacement is not attributable to changes in cortisol-binding globulin concentrations.

    Science.gov (United States)

    Chung, T T; Gunganah, K; Monson, J P; Drake, W M

    2016-04-01

    Patients taking hydrocortisone (HC) replacement for primary or secondary adrenal failure require individual adjustment of their dose. In addition to modifying the administered doses of HC for each patient, physicians are increasingly interested in variations in the bioavailability of glucocorticoid replacement. One potential determinant of the bioavailability of replaced HC is a variation in serum cortisol-binding globulin (CBG) concentration, which may, in turn, affect interpretation of cortisol profiles and individual dose selection for patients on hydrocortisone replacement therapy. To investigate the hypothesis that there is a circadian variation in CBG levels. A total of 34 male patients divided into 3 groups (10 patients with non-somatotroph structural pituitary disease on HC replacement, 11 patients with treated acromegaly on HC replacement and 13 patients with treated acromegaly not on HC replacement) and 10 healthy volunteers were included. Cortisol and CBG levels were measured at 6 time points (0800, 1100, 1300, 1500, 1700 and 1900). No significant circadian variation in CBG concentration was found in any of the 4 groups. Circadian variation in serum cortisol during hydrocortisone replacement is not attributable to changes in cortisol-binding globulin concentration. Changes in serum cortisol levels may thus be explained by other factors including 11 β-hydroxysteroid dehydrogenase type 1 activity or circadian changes in the binding properties of CBG. © 2015 John Wiley & Sons Ltd.

  11. Hip Resurfacing: An Alternative to Conventional Hip Replacement?

    Science.gov (United States)

    ... Is hip resurfacing a good alternative to hip replacement? Answers from Mark Spangehl, M.D. Hip resurfacing has lost favor with many surgeons ... women with poor bone quality. Unlike traditional hip replacement, hip resurfacing doesn't completely replace the "ball" ...

  12. Signal post-processing for acoustic velocimeters: detecting and replacing spikes

    International Nuclear Information System (INIS)

    Razaz, Mahdi; Kawanisi, Kiyosi

    2011-01-01

    Time series recorded by acoustic velocimeters are often affected by a combination of factors, including turbulent velocity fluctuations, Doppler noise and signal aliasing. Although it is not possible to find a comprehensive threshold for identifying spurious data, the present work attempts to describe an effective technique for detecting spikes. This technique is based on transforming data into wavelet space and thresholding the wavelet basis by a consistent threshold. The universal threshold modified by a robust scale estimator such as Q n is proven to work extremely well. The suggested methods for replacing identified spikes combine times series analyses (linear time series modelling or a Kalman predictor) with a straightforward method, polynomial interpolation, to generate substitutions retaining both the trends and the fluctuations in the surrounding clean data. Then, tests were performed to reveal the influence of replacing methods on the total number of detected spikes, required iterations and physical properties of the restored signal. From the overall results, it is inferred that using the wavelet-Q n as the detecting module and integrating it with linear time series modelling/Kalman filtering as the replacement module constitutes an effective despiking algorithm. This methodology is capable of restoring the contaminated signal in such a way that its statistical and physical properties correlate well with those of the original record

  13. Total Humeral Endoprosthetic Replacement following Excision of Malignant Bone Tumors

    Directory of Open Access Journals (Sweden)

    Suhel Kotwal

    2016-01-01

    Full Text Available Humerus is a common site for malignant tumors. Advances in adjuvant therapies and reconstructive methods provide salvage of the upper limb with improved outcomes. Reports of limb salvage with total humeral replacement in extensive humeral tumors are sparse. We undertook a retrospective study of 20 patients who underwent total humeral endoprosthetic replacement as limb salvage following excision of extensile malignant tumor from 1990 to 2011. With an average followup of 42.9, functional and oncological outcomes were analyzed. Ten patients were still alive at the time of review. Mean estimated blood loss was 1131 mL and duration of surgery was 314 minutes. Deep infection was encountered in one patient requiring debridement while mechanical loosening of ulnar component was identified in one patient. Subluxation of prosthetic humeral head was noted in 3 patients. Mean active shoulder abduction was 12.5° and active flexion was 15°. Incompetence of abduction mechanism was the major determinant of poor active functional outcome. Mean elbow flexion was 103.5° with 30.5° flexion contracture in 10 patients with good and useful hand function. Average MSTS score was 71.5%. Total humeral replacement is a reliable treatment option in restoring mechanical stability and reasonable functional results without compromising patient survival, with low complication rate.

  14. Life cycle assessment: Existing building retrofit versus replacement

    Science.gov (United States)

    Darabi, Nura

    The embodied energy in building materials constitutes a large part of the total energy required for any building (Thormark 2001, 429). In working to make buildings more energy efficient this needs to be considered. Integrating considerations about life cycle assessment for buildings and materials is one promising way to reduce the amount of energy consumption being used within the building sector and the environmental impacts associated with that energy. A life cycle assessment (LCA) model can be utilized to help evaluate the embodied energy in building materials in comparison to the buildings operational energy. This thesis takes into consideration the potential life cycle reductions in energy and CO2 emissions that can be made through an energy retrofit of an existing building verses demolition and replacement with a new energy efficient building. A 95,000 square foot institutional building built in the 1960`s was used as a case study for a building LCA, along with a calibrated energy model of the existing building created as part of a previous Masters of Building Science thesis. The chosen case study building was compared to 10 possible improvement options of either energy retrofit or replacement of the existing building with a higher energy performing building in order to see the life cycle relationship between embodied energy, operational energy, and C02 emissions. As a result of completing the LCA, it is shown under which scenarios building retrofit saves more energy over the lifespan of the building than replacement with new construction. It was calculated that energy retrofit of the chosen existing institutional building would reduce the amount of energy and C02 emissions associated with that building over its life span.

  15. App Inventor for Android Build Your Own Apps - No Experience Required!

    CERN Document Server

    Tyler, Jason

    2011-01-01

    Create Android mobile apps, no programming required! Even with limited programming experience, you can easily learn to create apps for the Android platform with this complete guide to App Inventor for Android. App Inventor for Android is a visual language that relies on simple programming blocks that users can drag and drop to create apps. This handy book gives you a series of fully worked-out apps, complete with their programming blocks, which you can customize for your own use or use as a starting point for creating the next killer app. And it's all without writing a single line of code. Don

  16. Electrocatalysts Prepared by Galvanic Replacement

    Directory of Open Access Journals (Sweden)

    Athanasios Papaderakis

    2017-03-01

    Full Text Available Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases hydrogen evolution too, both oxygen levels and the pH must be optimized. The resulting bimetallic material can in principle have a Mnoble-rich shell and M-rich core (denoted as Mnoble(M leading to a possible decrease in noble metal loading and the modification of its properties by the underlying metal M. This paper reviews a number of bimetallic or ternary electrocatalytic materials prepared by galvanic replacement for fuel cell, electrolysis and electrosynthesis reactions. These include oxygen reduction, methanol, formic acid and ethanol oxidation, hydrogen evolution and oxidation, oxygen evolution, borohydride oxidation, and halide reduction. Methods for depositing the precursor metal M on the support material (electrodeposition, electroless deposition, photodeposition as well as the various options for the support are also reviewed.

  17. Telerehabilitation Feasibility in Total Joint Replacement

    Directory of Open Access Journals (Sweden)

    Mark J. Nelson

    2017-11-01

    Full Text Available Despite documented benefits, many Total Joint Replacement (TJR patients find it difficult to access rehabilitation following discharge from hospital. One solution to improve access for TJR patients is telerehabilitation. This study aimed to assess the feasibility of introducing a telerehabilitation program for TJR patients.   TJR patients at QEII Jubilee Hospital were invited to complete a questionnaire regarding their access, feelings towards and preferences in using technology. Seventy-five patients were recruited. Most patients had computer access (72% and internet (69% at home. Sixty-five percent of participants were willing to participate in telerehabilitation. A significant difference was found between older and younger patients. Watching videos on an electronic device was the preferred method for a technology-based home exercise program and phone call the preferred method of communication.  Results indicate telerehabilitation in the TJR population is feasible from the perspective of access to, feelings toward, and preferences for technology. Keywords: Hip replacement, Knee replacement, Telerehabilitation, Telemedicine, Total joint replacement

  18. Requirements for a next generation nuclear data format

    International Nuclear Information System (INIS)

    Archier, Pascal; Jouanne, Cedric; Peneliau, Yannick; Saint-Jean, Cyrille de; Trama, Jean-Christophe; Becky, Bret; Cullen, D.E. Red; Mattoony, Caleb; McNabb, Dennis; Brownyz, David; Herman, Michal; Johnson, Timothy; Sonzogni, Alejandro; Cabellos, Oscar; Capote Noy, Roberto; Forrest, Robin; Trkov, Andrej; Zerkiny, Viktor; Go, Chiba; Conliny, Jeremy Lloyd; Kahler, A.H. Skip; Talouy, Patrick; Whitey, Morgan C.; Cornock, Mark; Coste-Delclaux, Mireille; Malvagi, Fausto; Dunn, Michael; Leal, Luiz; Pigni, Marco; Wiarda, Dorothea; Dupont, Emmeric; Fischer, Ulrich; Tokio, Fukahori; Makoto, Ishikawa; Osamu, Iwamoto; Chikara, Konno; Teruhiko, Kugo; Kenji, Nishihara; Tatsuhiko, Sato; Kenya, Suyama; Kenji, Yokoyama; Haeck, Wim; Hawari, Ayman; Holmes, Jessie; Jacqmin, Robert; Noguere, Gilles; Kodeli, Ivo; Koningy, Arjan; Lee, Morgan; Sublet, Jean-Christophe; Lubitz, Cecil; Romano, Paul; Millsy, Robert; Roubtsovy, Danila; Scopatz, Anthony; Sinitsa, Valentin; Soppera, Nicolas; Vogty, Romona

    2015-01-01

    This document attempts to compile the requirements for the top-levels of a hierarchical arrangement of nuclear data such as is found in the ENDF format. This set of requirements will be used to guide the development of a new set of formats to replace the legacy ENDF format. (authors)

  19. Physical activity in the elderly who underwent joint replacement surgery in the course of rheumatic diseases

    Directory of Open Access Journals (Sweden)

    Agnieszka Prusinowska

    2016-07-01

    Full Text Available According to the forecasts of the Central Statistical Office of Poland, in 2030 people at the age of 65 and older will account for 23.8%, i.e. their number will amount to approx. 8.5 m people. Geriatric rheumatic patients more often decide to undergo surgical joint replacement. According to the National Health Fund, the number of joint replacement services provided in 2014 increased by 93%, as compared to 2005. Improving the physical performance of this constantly expanding group of patients requires taking into account many factors to raise their functional status, reduce the risk of falling, teach rules of proper functioning with an artificial joint and encourage unassisted physical activity. Restoring fitness and independence is a difficult but necessary task due to an increasing number of seniors with replaced joint.

  20. Aortic root replacement after previous surgical intervention on the aortic valve, aortic root, or ascending aorta.

    Science.gov (United States)

    Kirsch, E W Matthias; Radu, N Costin; Mekontso-Dessap, Armand; Hillion, Marie-Line; Loisance, Daniel

    2006-03-01

    Aortic root replacement after a previous operation on the aortic valve, aortic root, or ascending aorta remains a major challenge. Records of 56 consecutive patients (44 men; mean age, 56.4 +/- 13.6 years) undergoing reoperative aortic root replacement between June 1994 and June 2005 were reviewed retrospectively. Reoperation was performed 9.4 +/- 6.7 years after the last cardiac operation. Indications for reoperation were true aneurysm (n = 14 [25%]), false aneurysm (n = 10 [18%]), dissection or redissection (n = 9 [16%]), structural or nonstructural valve dysfunction (n = 10 [18%]), prosthetic valve-graft infection (n = 12 [21%]), and miscellaneous (n = 1 [2%]). Procedures performed were aortic root replacement (n = 47 [84%]), aortic root replacement plus mitral valve procedure (n = 5 [9%]), and aortic root replacement plus arch replacement (n = 4 [7%]). In 14 (25%) patients coronary artery bypass grafting had to be performed unexpectedly during the same procedure or immediately after the procedure to re-establish coronary perfusion. Hospital mortality reached 17.9% (n = 10). Multivariate logistic regression analysis revealed the need for unplanned perioperative coronary artery bypass grafting as the sole independent risk factor for hospital death (P = .005). Actuarial survival was 83.8% +/- 4.9% at 1 month, 73.0% +/- 6.3% at 1 year, and 65.7% +/- 9.0% at 5 years after the operation. One patient had recurrence of endocarditis 6.7 months after the operation and required repeated homograft aortic root replacement. Reoperative aortic root replacement remains associated with a high postoperative mortality. The need to perform unplanned coronary artery bypass grafting during reoperative aortic root replacement is a major risk factor for hospital death. The optimal technique for coronary reconstruction in this setting remains to be debated.

  1. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  2. Effect of sodium butyrate supplementation in milk replacer and starter diet on rumen development in calves

    DEFF Research Database (Denmark)

    Gorka, P; Kowalski, Z M; Pietrzak, P

    2009-01-01

    the effect of sodium butyrate (NaB) supplementation in milk replacer and starter diet on rumen development in rearing calves. Fourteen bull calves (5-day-old) were randomly allocated to two groups: Control (C) and NaB. The later received 0.3 % NaB in milk replacer and starter diet. Animals were in experiment...... up to age of 26 days. Addition of NaB to milk replacer and starter diet had no effect on daily growth rate, but reduced the weight loss observed in C calves in first 11 days of age. Additionally, the NaB calves weighed more at the end of the study and tended to have higher growth rate in the whole......, and no change in muscle layer thickness, as compared to control. Plasma glucagon-like peptide-2 relative increase was higher in NaB group than in C group, and may be involved in rumen development. In conclusion, supplementation of the diet (milk replacer and starter diet) with NaB may enhance rumen development...

  3. 30 CFR 57.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 57.19122 Section 57.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 57.19122 Replacement parts. Parts used to repair hoists shall have properties...

  4. 30 CFR 56.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 56.19122 Section 56.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 56.19122 Replacement parts. Parts used to repair hoists shall have properties...

  5. Primary vs. secondary antibody deficiency: clinical features and infection outcomes of immunoglobulin replacement.

    Directory of Open Access Journals (Sweden)

    Sai S Duraisingham

    Full Text Available Secondary antibody deficiency can occur as a result of haematological malignancies or certain medications, but not much is known about the clinical and immunological features of this group of patients as a whole. Here we describe a cohort of 167 patients with primary or secondary antibody deficiencies on immunoglobulin (Ig-replacement treatment. The demographics, causes of immunodeficiency, diagnostic delay, clinical and laboratory features, and infection frequency were analysed retrospectively. Chemotherapy for B cell lymphoma and the use of Rituximab, corticosteroids or immunosuppressive medications were the most common causes of secondary antibody deficiency in this cohort. There was no difference in diagnostic delay or bronchiectasis between primary and secondary antibody deficiency patients, and both groups experienced disorders associated with immune dysregulation. Secondary antibody deficiency patients had similar baseline levels of serum IgG, but higher IgM and IgA, and a higher frequency of switched memory B cells than primary antibody deficiency patients. Serious and non-serious infections before and after Ig-replacement were also compared in both groups. Although secondary antibody deficiency patients had more serious infections before initiation of Ig-replacement, treatment resulted in a significant reduction of serious and non-serious infections in both primary and secondary antibody deficiency patients. Patients with secondary antibody deficiency experience similar delays in diagnosis as primary antibody deficiency patients and can also benefit from immunoglobulin-replacement treatment.

  6. Primary vs. Secondary Antibody Deficiency: Clinical Features and Infection Outcomes of Immunoglobulin Replacement

    Science.gov (United States)

    Duraisingham, Sai S.; Buckland, Matthew; Dempster, John; Lorenzo, Lorena; Grigoriadou, Sofia; Longhurst, Hilary J.

    2014-01-01

    Secondary antibody deficiency can occur as a result of haematological malignancies or certain medications, but not much is known about the clinical and immunological features of this group of patients as a whole. Here we describe a cohort of 167 patients with primary or secondary antibody deficiencies on immunoglobulin (Ig)-replacement treatment. The demographics, causes of immunodeficiency, diagnostic delay, clinical and laboratory features, and infection frequency were analysed retrospectively. Chemotherapy for B cell lymphoma and the use of Rituximab, corticosteroids or immunosuppressive medications were the most common causes of secondary antibody deficiency in this cohort. There was no difference in diagnostic delay or bronchiectasis between primary and secondary antibody deficiency patients, and both groups experienced disorders associated with immune dysregulation. Secondary antibody deficiency patients had similar baseline levels of serum IgG, but higher IgM and IgA, and a higher frequency of switched memory B cells than primary antibody deficiency patients. Serious and non-serious infections before and after Ig-replacement were also compared in both groups. Although secondary antibody deficiency patients had more serious infections before initiation of Ig-replacement, treatment resulted in a significant reduction of serious and non-serious infections in both primary and secondary antibody deficiency patients. Patients with secondary antibody deficiency experience similar delays in diagnosis as primary antibody deficiency patients and can also benefit from immunoglobulin-replacement treatment. PMID:24971644

  7. Partial knee replacement

    Science.gov (United States)

    ... good range of motion in your knee. The ligaments in your knee are stable. However, most people with knee arthritis have a surgery called a total knee arthroplasty (TKA). Knee replacement is most often done in people age 60 ...

  8. 'Chasing the numbers': Australian Bachelor of Midwifery students' experiences of achieving midwifery practice requirements for registration.

    Science.gov (United States)

    Licqurish, Sharon; Seibold, Camel

    2013-06-01

    to explore one aspect of the findings from a qualitative study exploring Australian Bachelor of Midwifery students' experiences of achieving competency for beginning practice. a qualitative study using grounded theory, incorporating situational analysis. Data were collected by interviews, field observation and students' documents. one university in Victoria, Australia, which was a member of a consortium of universities that first implemented Bachelor of Midwifery curricula. 19 women, aged 20-40 years, completing the Bachelor of Midwifery course between the years 2005 and 2008. data analysis revealed an overarching social process of assimilation, and three related subprocesses namely realisation, adaptation and consolidation. This paper focuses on consolidation in terms of competency achievement in relation to set requirements. while generally found competent for beginning practice, the Bachelor of Midwifery students in this study felt that their ability to achieve competency according to professional midwifery standards, was constrained by the restricted nature of midwifery practice and medical dominance in the hospitals where they were placed. Furthermore, they found it challenging to achieve the minimum midwifery experience requirements, as well as their own personal learning objectives, within the clinical practicum hours provided in the curriculum. a review of the clinical hours provided by Bachelor of Midwifery curricula is required, with a view to ensure that clinical hours are consistent with recommended hours suggested by Australian Bachelor of Midwifery course accreditation standards. Universities implementing midwifery curricula in Australia need to be cognisant of the theory-practice gap and therefore the applicability of professional competency standards to the education of midwives. The concerns about the reliability of competency standards need to be addressed. Finally, further research is required to validate the current number of, minimum practice

  9. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  10. The Effects of including a replacement questionnaire in the first follow-up to an industrial population

    DEFF Research Database (Denmark)

    Mortensen, Peter Stendahl

    2006-01-01

    was identical in all cases. The study compared the impact on response rates, costs, timeliness and quality. The response rate between the first and second reminders was significantly higher in the replacement group, but the second reminder evens out most of this difference. In addition, logistic......  This study reports on a field experiment in which the effects of manipulating the contents of the first reminder in an industrial survey were investigated. Every second non-responding company received a replacement questionnaire with the first mailed reminder, while the second reminder......-regression models revealed significant differences in the reaction from different industries and regions. For the replacement group, the cost/response rate was 20% higher and the marginal cost per extra response was four times that of the responses to the first mailing. However, the questionnaires were returned...

  11. Late rupture of the posterior cruciate ligament after total knee replacement.

    OpenAIRE

    Montgomery, R. L.; Goodman, S. B.; Csongradi, J.

    1993-01-01

    To our knowledge there have been no reports of late rupture of the posterior cruciate ligament (PCL) as a cause of instability in PCL-retaining total knee prostheses. In our experience of 150 total knee replacements using PCL-retaining prosthesis, three cases (2.0%) of late rupture of the posterior cruciate ligament have occurred, each leading to chronic instability, disabling pain, and revision arthroplasty. In each case rupture of the posterior cruciate ligament was confirmed at the time of...

  12. ReplacementMatrix: a web server for maximum-likelihood estimation of amino acid replacement rate matrices.

    Science.gov (United States)

    Dang, Cuong Cao; Lefort, Vincent; Le, Vinh Sy; Le, Quang Si; Gascuel, Olivier

    2011-10-01

    Amino acid replacement rate matrices are an essential basis of protein studies (e.g. in phylogenetics and alignment). A number of general purpose matrices have been proposed (e.g. JTT, WAG, LG) since the seminal work of Margaret Dayhoff and co-workers. However, it has been shown that matrices specific to certain protein groups (e.g. mitochondrial) or life domains (e.g. viruses) differ significantly from general average matrices, and thus perform better when applied to the data to which they are dedicated. This Web server implements the maximum-likelihood estimation procedure that was used to estimate LG, and provides a number of tools and facilities. Users upload a set of multiple protein alignments from their domain of interest and receive the resulting matrix by email, along with statistics and comparisons with other matrices. A non-parametric bootstrap is performed optionally to assess the variability of replacement rate estimates. Maximum-likelihood trees, inferred using the estimated rate matrix, are also computed optionally for each input alignment. Finely tuned procedures and up-to-date ML software (PhyML 3.0, XRATE) are combined to perform all these heavy calculations on our clusters. http://www.atgc-montpellier.fr/ReplacementMatrix/ olivier.gascuel@lirmm.fr Supplementary data are available at http://www.atgc-montpellier.fr/ReplacementMatrix/

  13. Novel synthetic Medea selfish genetic elements drive population replacement in Drosophila; a theoretical exploration of Medea-dependent population suppression.

    Science.gov (United States)

    Akbari, Omar S; Chen, Chun-Hong; Marshall, John M; Huang, Haixia; Antoshechkin, Igor; Hay, Bruce A

    2014-12-19

    Insects act as vectors for diseases of plants, animals, and humans. Replacement of wild insect populations with genetically modified individuals unable to transmit disease provides a potentially self-perpetuating method of disease prevention. Population replacement requires a gene drive mechanism in order to spread linked genes mediating disease refractoriness through wild populations. We previously reported the creation of synthetic Medea selfish genetic elements able to drive population replacement in Drosophila. These elements use microRNA-mediated silencing of myd88, a maternally expressed gene required for embryonic dorso-ventral pattern formation, coupled with early zygotic expression of a rescuing transgene, to bring about gene drive. Medea elements that work through additional mechanisms are needed in order to be able to carry out cycles of population replacement and/or remove existing transgenes from the population, using second-generation elements that spread while driving first-generation elements out of the population. Here we report the synthesis and population genetic behavior of two new synthetic Medea elements that drive population replacement through manipulation of signaling pathways involved in cellular blastoderm formation or Notch signaling, demonstrating that in Drosophila Medea elements can be generated through manipulation of diverse signaling pathways. We also describe the mRNA and small RNA changes in ovaries and early embryos associated from Medea-bearing females. Finally, we use modeling to illustrate how Medea elements carrying genes that result in diapause-dependent female lethality could be used to bring about population suppression.

  14. Organisational reviews - requirements, methods and experience. Progress report 2006

    Energy Technology Data Exchange (ETDEWEB)

    Reiman, T.; Oedewald, P.; Wahlstroem, B. [VTT, Technical Research Centre of Finland (Finland); Rollenhagen, C.; Kahlbom, U. [Maelardalen University (FI)

    2007-04-15

    Organisational reviews are important instruments in the continuous quest for improved performance. In the nuclear field there has been an increasing regulatory interest in organisational performance, because incidents and accidents often point to organisational deficiencies as one of the major precursors. Many methods for organisational reviews have been proposed, but they are mostly based on ad hoc approaches to specific problems. The absence of well-established techniques for organisational reviews has already shown to cause discussions and controversies on different levels. The aim of the OrRe project is to collect the experiences from organisational reviews carried out so far and to reflect them in a theoretical model of organisational performance. Furthermore, the project aims to reflect on the criteria for the definition of the scope and content of organisational reviews. Finally, recommendations will be made for guidance for people participating in organisational reviews. This progress report describes regulatory practices in Finland and Sweden together with some case examples of organizational reviews and assessment in both countries. Some issues of concern are raised and an outline for the next year's work is proposed. Issues of concern include the sufficient depth of the assessment, the required competence in assessments, data and criteria problems, definition of the boundaries of the system to be assessed, and the necessary internal support and organisational maturity required for successful assessments. Finally, plans for next year's work are outlined. (au)

  15. Organisational reviews - requirements, methods and experience. Progress report 2006

    International Nuclear Information System (INIS)

    Reiman, T.; Oedewald, P.; Wahlstroem, B.; Rollenhagen, C.; Kahlbom, U.

    2007-04-01

    Organisational reviews are important instruments in the continuous quest for improved performance. In the nuclear field there has been an increasing regulatory interest in organisational performance, because incidents and accidents often point to organisational deficiencies as one of the major precursors. Many methods for organisational reviews have been proposed, but they are mostly based on ad hoc approaches to specific problems. The absence of well-established techniques for organisational reviews has already shown to cause discussions and controversies on different levels. The aim of the OrRe project is to collect the experiences from organisational reviews carried out so far and to reflect them in a theoretical model of organisational performance. Furthermore, the project aims to reflect on the criteria for the definition of the scope and content of organisational reviews. Finally, recommendations will be made for guidance for people participating in organisational reviews. This progress report describes regulatory practices in Finland and Sweden together with some case examples of organizational reviews and assessment in both countries. Some issues of concern are raised and an outline for the next year's work is proposed. Issues of concern include the sufficient depth of the assessment, the required competence in assessments, data and criteria problems, definition of the boundaries of the system to be assessed, and the necessary internal support and organisational maturity required for successful assessments. Finally, plans for next year's work are outlined. (au)

  16. The reliability of structural systems operating at high temperature: Replacing engineering judgement with operational experience

    International Nuclear Information System (INIS)

    Chevalier, M.J.; Smith, D.J.; Dean, D.W.

    2012-01-01

    Deterministic assessments are used to assess the integrity of structural systems operating at high temperature by providing a lower bound lifetime prediction, requiring considerable engineering judgement. However such a result may not satisfy the structural integrity assessment purpose if the results are overly conservative or conversely plant observations (such as failures) could undermine the assessment result if observed before the lower bound lifetime. This paper develops a reliability methodology for high temperature assessments and illustrates the impact and importance of managing the uncertainties within such an analysis. This is done by separating uncertainties into three classifications; aleatory uncertainty, quantifiable epistemic uncertainty and unquantifiable epistemic uncertainty. The result is a reliability model that can predict the behaviour of a structural system based upon plant observations, including failure and survival data. This can be used to reduce the over reliance upon engineering judgement which is prevalent in deterministic assessments. Highlights: ► Deterministic assessments are shown to be heavily reliant upon engineering judgment. ► Based upon the R5 procedure, a reliability model for a structural system is developed. ► Variables must be classified as either aleatory or epistemic to model their impact on reliability. ► Operation experience is then used to reduce reliance upon engineering judgment. ► This results in a model which can predict system behaviour and learn from operational experience.

  17. 30 CFR 823.14 - Soil replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Soil replacement. 823.14 Section 823.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-OPERATIONS ON PRIME FARMLAND § 823.14 Soil replacement. (a) Soil...

  18. Continuous Renal Replacement Therapy Applications on Extracorporeal Membrane Oxygenation Circuit.

    Science.gov (United States)

    Yetimakman, Ayse Filiz; Tanyildiz, Murat; Kesici, Selman; Kockuzu, Esra; Bayrakci, Benan

    2017-06-01

    Continuous venovenous hemofiltration or hemodiafiltration is used frequently in pediatric patients, but experience of continuous renal replacement therapy (CRRT) application on extracorporeal membrane oxygenation (ECMO) circuit is still limited. Among several methods used for applying CRRT on ECMO patients, we aim to share our experience on inclusion of a CRRT device in the ECMO circuit which we believe is easier and safer to apply. The data were collected on demographics, outcomes, and details of the treatment of ECMO patients who had CRRT. During the study period of 3 years, venous cannula of ECMO circuit before pump was used for CRRT access for both the filter inlet and outlet of CRRT machine to minimize the thromboembolic complications. The common indication for CRRT was fluid overload. CRRT was used in 3.68% of a total number of patients admitted and 43% of patients on ECMO. The patients have undergone renal replacement therapy for periods of time ranging between 24 h and 25 days (260 h mean). The survival rate of this group of patients with multiorgan failure was 33%. Renal recovery occurred in all of the survivors. Complications such as electrolyte imbalance, hypothermia, and bradykinin syndrome were easily managed. Adding a CRRT device on ECMO circuit is a safe and effective technique. The major advantages of this technique are easy to access, applying CRRT without extra anticoagulation process, preventing potential hemodynamic disturbances, and increased clearance of solutes and fluid overload using larger hemofilter.

  19. Integration technique of digital I and C replacement and its Critical Digital Review procedure

    International Nuclear Information System (INIS)

    Huang, Hui-Wen; Yang, Wen-Long

    2013-01-01

    Highlights: ► A digital I and C replacement integration technique have been developed. ► Establishment of Nuclear Power Plant Digital Replacement Integration Guideline. ► Preliminary Investigation on I and C System Digitalization. ► Evaluation on I and C System Digitalization. ► Establishment of I and C System Digitalization Architectures. -- Abstract: Institute of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin–Shan (CS) NPP, Kuo–Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) procedure. The digital I and C replacement integration technique includes: (1) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR-1011710 (2005) “Handbook for Evaluating Critical Digital Equipment and Systems” which was published by the Electric Power Research Institute (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SV and V), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of

  20. Effects of 18 months of L-T4 replacement in women with subclinical hypothyroidism.

    LENUS (Irish Health Repository)

    Adrees, M

    2012-02-01

    cardiovascular risk factors following L-T4 replacement in SCH potentially explains reduced CIMT. Increased carotid and brachial artery diameters and normalized eGFR indicates a haemodynamic effect of L-T4 replacement, the importance of which requires further investigation.

  1. Preparation and planning for the replacement of the Oregon State University TRIGA reactor rotary specimen rack assembly

    International Nuclear Information System (INIS)

    Anderson, T.V.; Dodd, B.; Johnson, A.G.; Carpenter, W.T.

    1984-01-01

    Recently there have been a number of indications that the rotating rack may be approaching the end of its useful life. In order to benefit from the experience of other reactors who have removed and replaced their rotating racks, General Atomic (GA) was contacted and previous TRIGA Conference proceedings were scanned. It was determined that a number of facilities, had experienced difficulties with their lazy susans and eventually had to replace them. However, most of the written descriptions of this project were not sufficiently detailed to be of great use. The purpose of this paper is to identify some of the more important questions related to the replacement of our rotating rack assembly and OSU's currently proposed solutions, with a view towards soliciting ideas from other members of the TRIGA reactor community

  2. Recurrent pannus formation causing prosthetic aortic valve dysfunction: Is excision without valve re-replacement applicable?

    Directory of Open Access Journals (Sweden)

    Darwazah Ahmad K

    2012-06-01

    Full Text Available Abstract Prosthetic valve dysfunction at aortic position is commonly caused by pannus formation. The exact etiology is not known. It arises from ventricular aspect of the prosthesis encroaching its leaflets causing stenosis or it may remain localized causing left ventricular outflow tract obstruction without affecting valve function. The difference in location entails different approaches in management. Such a pathology requires surgical excision of the pannus with or without valve re-replacement. A recurrent pannus was observed in a female patient who needed repeated surgical intervention to excise a localized pannus without re-replacement of a well functioning prosthetic valve. Management of our case presents several questions, whether recurrence of pannus is caused by sparing the prosthetic valve, is it simply an exaggeration of an inflammatory healing process in certain individuals or is it ideal to re-replace the valve despite a well preserved function.

  3. Design and manufacture of steam generators for replacement

    International Nuclear Information System (INIS)

    Hirano, Hiroshi; Kuri, Syuhei

    1995-01-01

    The basic specification of the steam generators for replacement as heat exchangers (the pressure, temperature, flow rate and thermal output on primary and secondary sides) is set same as that of steam generators before replacement, but the latest design reflecting the operation experience obtained so far and taking the countermeasures for preventing heating tube damage in it is adopted, such as the heating tubes made of TT 690 alloy, the tube support plates with four-lobe shape tube holes made of stainless steel, the stainless steel rest fittings of three in one set and so on. After the heating tube break accident in Mihama No. 2 plant, the quality control was further strengthened. The comparison of the specifications of the steam generators of respective plants before and after the replacement is shown. The main objective of improving steam generators is the heightening of the reliability of heating tubes against intergranular attack and primary water stress corrosion cracking. The improvements of heating tube material, tube support plate material, secondary side heat flow, the shape of tube holes of tube support plates, the method of expanding heating tubes, and vibration-controlling fittings are explained. As to the manufacturing procedure and quality control, the manufacture of raw materials, the build-up welding of tube plates, the manufacture of lower half shell plates, the tube hole making of support plates, the insection of outer cylinder, flow rate distribution plate. Support plates and heating tubes, the sealing welding and expanding of heating tubes, the fixing of rest fittings, the manufacture and fixing of water chamber cover, the manufacture of upper half shell, the fixing of parts inside it, the final joint and inspection are described. (K.I.)

  4. Valve-sparing and valve-replacing techniques for aortic root replacement in patients with Marfan syndrome: Analysis of early outcome.

    Science.gov (United States)

    Volguina, Irina V; Miller, D Craig; LeMaire, Scott A; Palmero, Laura C; Wang, Xing Li; Connolly, Heidi M; Sundt, Thoralf M; Bavaria, Joseph E; Dietz, Harry C; Milewicz, Dianna M; Coselli, Joseph S

    2009-05-01

    A prospective, international registry study was initiated to provide contemporary comparative data on short-term clinical outcomes after aortic valve-sparing and aortic valve-replacing root operations in patients with Marfan syndrome. The purpose of this initial report is to describe the study design and to compare early outcomes in the first 151 enrolled patients. We assessed 30-day outcomes in 151 patients who met strict Ghent diagnostic criteria for Marfan syndrome and underwent aortic root replacement with either valve-replacing (n = 46) or valve-sparing techniques (n = 105) at one of 18 participating centers. In the valve replacement group, a mechanical composite valve graft was used in 39 (85%) patients and a bioprosthetic valve in 7 (15%). In the valve-sparing group, David V procedures were performed in 57 (54%) patients, David I in 38 (36%), David IV in 8 (8%), Florida sleeve in 1 (1%), and Yacoub remodeling in 1 (1%). No in-hospital or 30-day deaths occurred. Despite longer crossclamp and cardiopulmonary bypass times in the valve-sparing group, there were no significant between-group differences in postoperative complications. Thirty-day valve-related complications occurred in 2 (4%) patients undergoing valve replacement and in 3 (3%) undergoing valve-sparing procedures (P = .6). The analysis of early outcomes revealed that valve-sparing techniques were the most common approach to root replacement in patients with Marfan syndrome in these centers. The complexity of valve-sparing root replacement did not translate into any demonstrable adverse early outcomes. Subsequent analysis will compare the 3-year durability of these two surgical approaches.

  5. A Bayesian perspective on age replacement with minimal repair

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Yeh, R.H.; Lin, Y.-B.; Juang, M.-G.

    1999-01-01

    In this article, a Bayesian approach is developed for determining an optimal age replacement policy with minimal repair. By incorporating minimal repair, planned replacement, and unplanned replacement, the mathematical formulas of the expected cost per unit time are obtained for two cases - the infinite-horizon case and the one-replacement-cycle case. For each case, we show that there exists a unique and finite optimal age for replacement under some reasonable conditions. When the failure density is Weibull with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal age replacement policy. Further, various special cases are discussed in detail. Finally, a numerical example is given

  6. 14 CFR 21.9 - Replacement and modification articles.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Replacement and modification articles. 21.9... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS General § 21.9 Replacement and modification articles. (a) If a person knows, or should know, that a replacement or modification article is reasonably likely to be...

  7. 45 CFR 201.70 - Treatment of replacement checks.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Treatment of replacement checks. 201.70 Section... STATES FOR PUBLIC ASSISTANCE PROGRAMS Review and Audits § 201.70 Treatment of replacement checks. (a... (FFP) for replacement checks under titles I, VI-A, X, XIV, XVI (AABD) except under the circumstances...

  8. 30 CFR 56.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 56.12036 Section 56.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... § 56.12036 Fuse removal or replacement. Fuses shall not be removed or replaced by hand in an energized...

  9. Characteristics of Australian smokers using bupropion and nicotine-replacement therapies.

    Science.gov (United States)

    Doran, Christopher; Stafford, Jennifer; Shanahan, Marian; Mattick, Richard P

    2007-02-01

    Smokers were surveyed using a computer-assisted telephone interview to explore behaviors associated with the use of bupropion and nicotine-replacement therapies, using a convenient sample of Australian smokers. With assistance from the Pharmacy Guild of Australia, smokers were recruited through pharmacies and interviewed at baseline and after 3 months. A total of 508 smokers were recruited, 396 were interviewed at baseline and 318 completed a 3-month computer-assisted telephone interview. At 3 months, over two-thirds of participants were still smoking, the majority daily. However, the number of cigarettes smoked per week reduced and the time taken before smoking the first cigarette after waking increased. Nearly all participants started their medication (94%), while only 39% completed the full course. The main reasons for not completing the full course were adverse side effects, such as abnormal dreams and sleep disturbance. Despite Australian guidelines for bupropion and nicotine-replacement therapies to be used within a comprehensive treatment program, only 11% of patients were recommended behavioral support for nicotine dependence by their doctor or pharmacist. The results of the study shed light on patient utilization of the medication in terms of uptake and completion, possible side effects experienced and use of adjuncts. A better understanding of the use and experience of bupropion and nicotine-replacement therapies, and the lack of behavioral support offered with these, provides policy makers with a stronger evidence base to refine and improve the use of such pharmacotherapies.

  10. Detailed requirements for a next generation nuclear data structure.

    Energy Technology Data Exchange (ETDEWEB)

    Brown, D. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-07-05

    This document attempts to compile the requirements for the top-levels of a hierarchical arrangement of nuclear data such as found in the ENDF format. This set of requirements will be used to guide the development of a new data structure to replace the legacy ENDF format.

  11. Requirements for the GCFR plenum streaming experiment

    International Nuclear Information System (INIS)

    Perkins, R.G.; Rouse, C.A.; Hamilton, C.J.

    1980-09-01

    This report gives the experiment objectives and generic descriptions of experimental configurations for the gas-cooled fast breeder reactor (GCFR) plenum shield experiment. This report defines four experiment phases. Each phase represents a distinct area of uncertainty in computing radiation transport from the GCFR core to the plenums, through the upper and lower plenum shields, and ultimately to the prestressed concrete reactor vessel (PCRV) liner: (1) the shield heterogeneity phase; (2) the exit shield simulation phase; (3) the plenum streaming phase; and (4) the plenum shield simulation phase

  12. Controlling the quality of replacement parts in nuclear station, class 1E equipment

    International Nuclear Information System (INIS)

    Pierson, R.K.; Clemons, R.W.

    1984-01-01

    Nuclear station owners have traditionally purchased replacement parts for Class 1E equipment from the original supplier of the equipment. By this method, part and equipment quality could be maintained. In recent years, however, this traditional source of parts has continuously declined as an increasing number of original equipment suppliers stop producing Class 1E equipment or no longer stock parts for older equipment. When replacement parts for Class 1E equipment are not obtainable from the original suppliers, equipment owners have created a variety of methods for assuring the quality of parts obtained from other sources. A standard that provides direction and guidance for maintaining the quality of Class 1E equipment when repaired with parts from alternate sources is, therefore, needed to assure the methods in use are satisfactory and to alert the equipment owners to additional acceptable methods. The standard has now been proposed. IEEE Standard P934 (June, 1983 Draft): ''Requirements for Replacement Parts for Class 1E Equipment in Nuclear Power Generating Stations'' (Ref-3) consist of an introductory section followed by sections on part selection, procurement, replacement (including inspections and tests), non-conforming conditions and records. The proposed standard also includes a non-mandatory appendix on acceptable procurement methods and a summary intended to assist the user in selecting a proper procurement method

  13. A replaceable reflective film for solar concentrators

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  14. Integration of the sensory experience and post-ingestive measures for understanding food satisfaction. A case study on sucrose replacement by Stevia rebaudiana and addition of beta glucan in fruit drinks

    DEFF Research Database (Denmark)

    Andersen, Barbara Vad; Mielby, Line H.; Viemose, Ida

    2017-01-01

    apple-cherry fruit drinks with different levels of beta-glucans and different sweeteners, sucrose or Stevia rebaudiana. The aims were: 1) to study the hedonic sensory experience, 2) to study time and product effects on post-ingestive sensations and satisfaction, and 3) to study main drivers....... Satisfaction with sensory attributes was found to be the main driver of food satisfaction, while post-ingestive sensations drove satisfaction as well. While replacing sucrose with Stevia rebaudiana did not affect the hedonic and post-ingestive sensations, addition of beta glucan resulted in both positive...

  15. Replacement Models Revisited | Alabi | Journal of Research in ...

    African Journals Online (AJOL)

    The objective is to review the annual total cost and the cumulative annual total cost average hitherto used as replacement methods. The study showed some disparity in the optimal age of single replacement as used by some authors. Hence, an arithmetic mean method of finding the optimal single- replacement- age of an ...

  16. COMPARING THE ENZYME REPLACEMENT THERAPY COST IN POST PANCREATECTOMY PATIENTS DUE TO PANCREATIC TUMOR AND CHRONIC PANCREATITIS

    Directory of Open Access Journals (Sweden)

    Anna Victoria FRAGOSO

    Full Text Available ABSTRACT Background - Among late postoperative complications of pancreatectomy are the exocrine and endocrine pancreatic insufficiencies. The presence of exocrine pancreatic insufficiency imposes, as standard treatment, pancreatic enzyme replacement. Patients with chronic pancreatitis, with intractable pain or any complications with surgical treatment, are likely to present exocrine pancreatic insufficiency or have this condition worsened requiring adequate dose of pancreatic enzymes. Objective - The aim of this study is to compare the required dose of pancreatic enzyme and the enzyme replacement cost in post pancreatectomy patients with and without chronic pancreatitis. Methods - Observational cross-sectional study. In the first half of 2015 patients treated at the clinic of the Department of Gastrointestinal Surgery at Hospital das Clínicas, Universidade de São Paulo, Brazil, who underwent pancreatectomy for at least 6 months and in use of enzyme replacement therapy were included in this series. The study was approved by the Research Ethics Committee. The patients were divided into two groups according to the presence or absence of chronic pancreatitis prior to pancreatic surgery. For this study, P<0.05 was considered statistically significant. Results - The annual cost of the treatment was R$ 2150.5 ± 729.39; R$ 2118.18 ± 731.02 in patients without pancreatitis and R$ 2217.74 ± 736.30 in patients with pancreatitis. Conclusion - There was no statistically significant difference in the cost of treatment of enzyme replacement post pancreatectomy in patients with or without chronic pancreatitis prior to surgical indication.

  17. Transcatheter Aortic Valve Replacement in Europe

    DEFF Research Database (Denmark)

    Mylotte, Darren; Osnabrugge, Ruben L J; Windecker, Stephan

    2013-01-01

    The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy.......The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy....

  18. An abstract machine for module replacement

    OpenAIRE

    Walton, Chris; Krl, Dilsun; Gilmore, Stephen

    1998-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement from the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection.

  19. Aeronautical Information System Replacement -

    Data.gov (United States)

    Department of Transportation — Aeronautical Information System Replacement is a web-enabled, automation means for the collection and distribution of Service B messages, weather information, flight...

  20. Fleet replacement modeling : final report, July 2009.

    Science.gov (United States)

    2009-07-01

    This project focused on two interrelated areas in equipment replacement modeling for fleets. The first area was research-oriented and addressed a fundamental assumption in engineering economic replacement modeling that all assets providing a similar ...

  1. A Level 1 Tracking Trigger for the CMS Experiment at the LHC Phase 2 Luminosity Upgrade

    CERN Document Server

    Pozzobon, Nicola

    2011-01-01

    The second decade of Large Hadron Collider operations, from about 2020 onwards, envisages a remarkable increase in collider instantaneous luminosity, one order of magnitude above the project one. This luminosity increase presents several challenges to the LHC experiments. The present tracker of the Compact Muon Solenoid experiment must be replaced with a system providing excellent tracking quality at higher luminosities, as well as Tracking Trigger inputs to the existing “Level 0” CMS trigger system at the full 40 MHz bunch-crossing rate. The minimal requirements for a Tracking Trigger would be the capability to confirm the presence of high-pT tracks associated with Calorimeter and/or Muon Level 0 triggers. The ability to provide eective isolation criteria may also be required, and would in any case substantially improve the Trigger performance. Maintaining the data rates generated by Tracking Trigger inputs within a manageable bandwidth requires sensor modules able to locally sparsify the data. Measuring...

  2. Influence of fly ash fineness on water requirement and shrinkage of blended cement mortars

    Directory of Open Access Journals (Sweden)

    Vanissorn Vimonsatit

    2015-12-01

    Full Text Available In this paper, the influence of fly ash fineness on water requirement and shrinkage of blended cement mortar was studied. The results indicate that the water requirement and shrinkage characteristic of the blended cement mortar are dependent on fly ash fineness and replacement level. The use of coarse fly ash slightly reduces the water requirement but greatly reduced the drying and the autogenous shrinkage of the blended cement mortars and the reduction is more with an increase in the fly ash replacement level. The finer fly ashes further reduce the water requirement, but increase the drying and the autogenous shrinkages as compared with coarser fly ash. The incorporation of superplasticizer drastically reduces the water requirement, but the effect on the drying and autogenous shrinkages of the normal Portland cement mortar is small. However, for the fly ash mortar, the use of superplasticizer results in a decrease in drying shrinkage and in a substantial increase in the autogenous shrinkage particularly for the fine fly ash at a high replacement level.

  3. Catheterization Laboratory: Structural Heart Disease, Devices, and Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Fiorilli, Paul N; Anwaruddin, Saif; Zhou, Elizabeth; Shah, Ronak

    2017-12-01

    The cardiac catheterization laboratory is advancing medicine by performing procedures on patients who would usually require sternotomy and cardiopulmonary bypass. These procedures are done percutaneously, allowing them to be performed on patients considered inoperable. Patients have compromised cardiovascular function or advanced age. An anesthesiologist is essential for these procedures in case of hemodynamic compromise. Interventionalists are becoming more familiar with transcatheter aortic valve replacement and the device has become smaller, both contributing to less complications. Left atrial occlusion and the endovascular edge-to-edge mitral valve repair devices were approved. Although these devices require general anesthesia, an invasive surgery and cardiopulmonary bypass machine are not necessary for deployment. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Extent of tooth decay in the mouth and increased need for replacement of dental restorations: the New England Children's Amalgam Trial.

    Science.gov (United States)

    Trachtenberg, Felicia; Maserejian, Nancy Nairi; Tavares, Mary; Soncini, Jennifer Ann; Hayes, Catherine

    2008-01-01

    The purpose of this study was to assess the relationship between baseline caries experience and the restoration replacement rate in children. The 5-year New England Children's Amalgam Trial recruited 534 6- to 10-year-old children with 2 or more carious posterior teeth. The association between decoy and longevity of restorations was assessed. Restorations with no follow-up (N = 391) were excluded from analysis. The average follow-up was 3.0 +/- 1.6 years in 489 children. Restorations with follow-up (N = 3,604) were placed in mouths with a median of 15 dfs/DFS and 8 dft/DFT. The need for replacement increased significantly (P or = 14 dfs/DFS needed replacement, compared to 9% for 2 to 5 dfs/DFS. Comparing dft/DFT after 5 years of follow-up, there was a 23% replacement rate for > or = 12 dft/DFT compared to 10% for 2 to 3 dft/DFT. Decoy in the mouth had a greater association with the need for replacement due to new caries compared to replacement due to recurrent caries. Children with more decoy at the time of restoration placement were at higher risk for replacement of restorations.

  5. Wear debris. An environmental issue in total joint replacement.

    Science.gov (United States)

    Manley, M T; Serekian, P

    1994-01-01

    There is a growing concern that osteolytic lesions, often adjacent to otherwise stable implants, are a recent phenomenon caused by some recent change in polyethylene, metal, or other aspect of the total hip construction. This study investigates the possibility that bearings and modular connections used in modern hip replacements are an unappreciated source of particulate debris. Measurements taken from contemporary femoral bearings show a significant mismatch in both surface finish and sphericity of mating metal and polyethylene components, with sphericity of inserts being much worse then sphericity of femoral heads. The tolerances for sphericity of polyethylene inserts were further changed by the placement of an insert into its metal shell. Hip simulator tests of assembled inserts and shells showed greater polyethylene weight loss for metal-backed shells than for inserts alone. Bending and torsional tests of metal/metal modular connections showed that dynamic loads can release large numbers of debris particles from taper junctions. Because osteolytic lesions clearly are associated with overload of tissue by debris particles, the design, manufacture, and tolerances of modular connections in total hip replacement all seem to require reevaluation.

  6. Apparatus for fuel replacement

    International Nuclear Information System (INIS)

    Imada, Takahiko.

    1974-01-01

    Object: To support a telescope mast such that no deforming load is applied to it even during massive vibration, it is held fixed at the time of fuel replacement to permit satisfactory remote control operation by automatic operation. Structure: The body of the fuel replacement apparatus is provided with telescope mast fixing means comprising a slide base supported for reciprocal movement with respect to a telescope mast, an operating arm pivoted at the slide base, a wrist member mounted on the free end of the operating arm and an engagement member for restricting the slide base and operating arm at the time of loading and unloading the fuel. When loading and unloading the fuel, the slide base and operating arm are restrained by the engagement member to reliably restrict the vibration of the telescope mast. When the fuel replacement apparatus is moved, the means provided on the operating arm is smoothly displaced to follow the swing (vibration) of the telescope mast to prevent the deforming load from being applied to the support portion or other areas. The wrist member supports the telescope mast such that it can be rotated while restraining movement in the axial direction, and it is provided with revolution drive means for rotating the telescope mast under remote control. (Kamimura, M.)

  7. Novel chitosan/diclofenac coatings on medical grade stainless steel for hip replacement applications

    Science.gov (United States)

    Finšgar, Matjaž; Uzunalić, Amra Perva; Stergar, Janja; Gradišnik, Lidija; Maver, Uroš

    2016-05-01

    Corrosion resistance, biocompatibility, improved osteointegration, as well the prevention of inflammation and pain are the most desired characteristics of hip replacement implants. In this study we introduce a novel multi-layered coating on AISI 316LVM stainless steel that shows promise with regard to all mentioned characteristics. The coating is prepared from alternating layers of the biocompatible polysaccharide chitosan and the non-steroid anti-inflammatory drug (NSAID), diclofenac. Electrochemical methods were employed to characterize the corrosion behavior of coated and uncoated samples in physiological solution. It is shown that these coatings improve corrosion resistance. It was also found that these coatings release the incorporated drug in controlled, multi-mechanism manner. Adding additional layers on top of the as-prepared samples, has potential for further tailoring of the release profile and increasing the drug dose. Biocompatibility was proven on human-derived osteoblasts in several experiments. Only viable cells were found on the sample surface after incubation of the samples with the same cell line. This novel coating could prove important for prolongation of the application potential of steel-based hip replacements, which are these days often replaced by more expensive ceramic or other metal alloys.

  8. Mitochondrial replacement techniques: egg donation, genealogy and eugenics.

    Science.gov (United States)

    Palacios-González, César

    2016-03-01

    Several objections against the morality of researching or employing mitochondrial replacement techniques have been advanced recently. In this paper, I examine three of these objections and show that they are found wanting. First I examine whether mitochondrial replacement techniques, research and clinical practice, should not be carried out because of possible harms to egg donors. Next I assess whether mitochondrial replacement techniques should be banned because they could affect the study of genealogical ancestry. Finally, I examine the claim that mitochondrial replacement techniques are not transferring mitochondrial DNA but nuclear DNA, and that this should be prohibited on ethical grounds.

  9. Pacemaker replacement in nonagenarians: Procedural safety and long-term follow-up.

    Science.gov (United States)

    Loirat, Aurélie; Fénéon, Damien; Behaghel, Albin; Behar, Nathalie; Le Helloco, Alain; Mabo, Philippe; Daubert, Jean-Claude; Leclercq, Christophe; Martins, Raphaël P

    2015-01-01

    The rate of pacemaker implantation is rising. Given that the life expectancy of the population is projected to increase, a large number of elderly patients are likely to be implanted in the future. As pacemaker batteries can last for 8-10years, an increasing number of pacemaker recipients will require replacement of their devices when they become nonagenarians. To analyse the short- and long-term outcomes after device replacement in nonagenarians. Patients aged≥90years referred to a tertiary centre for pacemaker replacement from January 2004 to July 2014 were included retrospectively. Clinical follow-up data were obtained from clinical visits or telephone interviews with patients or their families. The primary clinical endpoint was total mortality. Secondary endpoints included early and delayed procedure-related complications and predictive risk factors for total mortality. Sixty-two patients were included (mean age 93.3±2.9years at time of pacemaker replacement). Mean procedure duration was 35.7±17.2minutes. Mean hospital stay was 2.2±1.1days. One patient died from a perioperative complication. Thirty-seven patients (59.7%) died during a median follow-up of 22.1months (interquartile range, 11.8-39.8months). Survival rates were 84.2% (95% confidence interval [CI] 71.8-91.5%) at 1year, 66.9% (95% CI 51.8-78.2%) at 2years and 22.7% (95% CI 10.6-37.7%) at 5years. Atrial fibrillation (hazard ratio 2.47, 95% CI 1.1-5.6) and non-physiological pacing (i.e. VVI pacing in patients in sinus rhythm) (hazard ratio 2.20, 95% CI 1.0-4.9) were predictors of mortality. Pacemaker replacement in nonagenarians is a safe and straightforward procedure. These data suggest that procedures can be performed securely in this old and frail population, with patients living for a median of 30months afterwards. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  10. Simulation of Post-Thyroidectomy Treatment Alternatives for Triiodothyronine or Thyroxine Replacement in Pediatric Thyroid Cancer Patients

    Science.gov (United States)

    Ben-Shachar, Rotem; Huang, Stephen A.; DiStefano, Joseph J.

    2012-01-01

    Background As in adults, thyroidectomy in pediatric patients with differentiated thyroid cancer is often followed by 131I remnant ablation. A standard protocol is to give normalizing oral thyroxine (T4) or triiodothyronine (T3) after surgery and then withdraw it for 2 to 6 weeks. Thyroid remnants or metastases are treated most effectively when serum thyrotropin (TSH) is high, but prolonged withdrawals should be avoided to minimize hypothyroid morbidity. Methods A published feedback control system model of adult human thyroid hormone regulation was modified for children using pediatric T4 kinetic data. The child model was developed from data for patients ranging from 3 to 9 years old. We simulated a range of T4 and T3 replacement protocols for children, exploring alternative regimens for minimizing the withdrawal period, while maintaining normal or suppressed TSH during replacement. The results are presented with the intent of providing a quantitative basis to guide further studies of pediatric treatment options. Replacement was simulated for up to 3 weeks post-thyroidectomy, followed by various withdrawal periods. T4 vs. T3 replacement, remnant size, dose size, and dose frequency were tested for effects on the time for TSH to reach 25 mU/L (withdrawal period). Results For both T3 and T4 replacement, higher doses were associated with longer withdrawal periods. T3 replacement yielded shorter withdrawal periods than T4 replacement (up to 3.5 days versus 7–10 days). Higher than normal serum T3 concentrations were required to normalize or suppress TSH during T3 monotherapy, but not T4 monotherapy. Larger remnant sizes resulted in longer withdrawal periods if T4 replacement was used, but had little effect for T3 replacement. Conclusions T3 replacement yielded withdrawal periods about half those for T4 replacement. Higher than normal hormone levels under T3 monotherapy can be partially alleviated by more frequent, smaller doses (e.g., twice a day). LT4 may be the

  11. Candidates to replace R-12 as a radiator gas in Cherenkov detectors

    Science.gov (United States)

    Harvey, Allan H.; Paulechka, Eugene; Egan, Patrick F.

    2018-06-01

    Dichlorodifluoromethane (R-12) has been widely used as a radiator gas in pressure threshold Cherenkov detectors for high-energy particle physics. However, that compound is becoming unavailable due to the Montreal Protocol. To find a replacement with suitably high refractive index, we use a combination of theory and experiment to examine the polarizability and refractivity of several non-ozone-depleting compounds. Our measurements show that the fourth-generation refrigerants R-1234yf (2,3,3,3-tetrafluoropropene) and R-1234ze(E) (trans-1,3,3,3-tetrafluoropropene) have sufficient refractivity to replace R-12 in this application. If the slight flammability of these compounds is a problem, two nonflammable alternatives are R-218 (octafluoropropane), which has a high Global Warming Potential, and R-13I1 (trifluoroiodomethane), which has low Ozone Depletion Potential and Global Warming Potential but may not be sufficiently inert.

  12. Joint replacement in Zambia: A review of Hip & Knee Replacement ...

    African Journals Online (AJOL)

    Methods: Data captured by the different variables entered into the Joint Register covering the pre-op, intra-op and post-op period of all total hip and knee replacement surgery done at the ZIOH from 1998 to 2010 was entered into a spreadsheet after verification with individual patient medical records. This was then imported ...

  13. Nuclear design and technical development required for ISER plant

    International Nuclear Information System (INIS)

    Yokoyama, Takashi; Yamano, Naoki.

    1987-01-01

    The report outlines some results of a study carried out by the ISER (intrinsically safe and economical reactor) Investigation Group. In particular, nuclear design concepts are examined in relation to the fuel cycle. Discussion is also made on technical development efforts to be made for realizing an ISER. Calculation of some basic nuclear design parameters is performed and results are used to examine the reactor core and fuel for ISER. As a result, it is indicated that a high-burnup type reactor core should be used on a 4.5-batch replacement, 15 EFPM (effective full power month) scheme to optimize an ISER. For technical development, consideration is made on various tests to be performed with an experimental reactor, called ISER-E, as well as other tests to provide basic data required for demonstrating the inherent safety of ISER. The study also deals with the possibility of the application of currently available light water reactor techniques to experiments with a critical assembly, non-nuclear test loop, and the experimental reactor ISER-E. It is revealed that many of the required experiments can be carried out by using test facilities and light water reactor techniques which are currently, or will be readily, available. It is stressed that international cooperation is necessary to accomplish these tests. (Nogami, K.)

  14. Renal replacement therapy in healthy adult horses.

    Science.gov (United States)

    Wong, D M; Witty, D; Alcott, C J; Sponseller, B A; Wang, C; Hepworth, K

    2013-01-01

    Renal replacement therapy (RRT) has been implemented extensively in people to facilitate recovery from acute renal failure (ARF). RRT has not been explored in horses, but might provide a further treatment option in horses with ARF. To investigate efficacy and safety of RRT in horses. Five healthy adult horses. A prospective study was performed on horses restrained in stocks and intravenously connected to a commercial RRT machine to allow continuous venovenous hemodiafiltration to be performed for 6 hours. The RRT machine was set at the following flow rates: blood flow rate 250 mL/min; dialysate rate 3,000 mL/h; prefilter replacement pump 3,000 mL/h; and postfilter replacement pump rate 2,000 mL/h. Balanced electrolyte solution was used as dialysate and replacement fluid. Heart rate, respiratory rate, body temperature, direct arterial blood pressure, urine output, and various clinicopathologic parameters were measured over the study period. Renal replacement therapy was successfully performed in horses, resulting in a mean creatinine clearance of 0.127 mL/kg/min (68.9 mL/min) and urea reduction ratio of 24%. No adverse effects were detected although a significant decrease in rectal temperature was observed (P ≤ .007). A significant increase in serum phosphorus (P ≤ .001) and decrease in BUN (P replacement therapy can safely and effectively be used in adult horses. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  15. Novel Synthetic Medea selfish genetic elements drive population replacement in Drosophila, and a theoretical exploration of Medea-dependent population suppression

    Science.gov (United States)

    Akbari, Omar S.; Chen, Chun-Hong; Marshall, John M.; Huang, Haixia; Antoshechkin, Igor; Hay, Bruce A.

    2013-01-01

    Insects act as vectors for diseases of plants, animals and humans. Replacement of wild insect populations with genetically modified individuals unable to transmit disease provides a potentially self-perpetuating method of disease prevention. Population replacement requires a gene drive mechanism in order to spread linked genes mediating disease refractoriness through wild populations. We previously reported the creation of synthetic Medea selfish genetic elements able to drive population replacement in Drosophila. These elements use microRNA-mediated silencing of myd88, a maternally expressed gene required for embryonic dorso-ventral pattern formation, coupled with early zygotic expression of a rescuing transgene, to bring about gene drive. Medea elements that work through additional mechanisms are needed in order to be able to carry out cycles of population replacement and/or remove existing transgenes from the population, using second-generation elements that spread while driving first-generation elements out of the population. Here we report the synthesis and population genetic behavior of two new synthetic Medea elements that drive population replacement through manipulation of signaling pathways involved in cellular blastoderm formation or Notch signaling, demonstrating that in Drosophila Medea elements can be generated through manipulation of diverse signaling pathways. We also describe the mRNA and small RNA changes in ovaries and early embryos associated from Medea-bearing females. Finally, we use modeling to illustrate how Medea elements carrying genes that result in diapause-dependent female lethality could be used to bring about population suppression. PMID:23654248

  16. Avascular necrosis of bone complicating corticosteroid replacement therapy.

    OpenAIRE

    Williams, P L; Corbett, M

    1983-01-01

    Two patients who developed widespread severe avascular necrosis of bone while on steroid replacement therapy are described. One, a diabetic, underwent yttrium-90 pituitary ablation for retinopathy and developed avascular necrosis within 18 months of starting prednisolone. The other, who had Addison's disease, developed avascular necrosis within 14 months of starting cortisol replacement therapy. Both cases came to bilateral total hip replacement.

  17. THE AGGREGATE IMPLICATIONS OF MACHINE REPLACEMENT: THEORY AND EVIDENCE

    OpenAIRE

    John Haltiwanger; Russell Cooper

    1992-01-01

    The authors study an economy in which producers incur resource costs to replace depreciated machines. The process of costly replacement and depreciation creates endogenous fluctuations in productivity, employment, and output of a single producer. The authors explore the spillover effects of machine replacement on other sectors of the economy and provide conditions for synchronized machine replacement by multiple independent producers. The implications of their model are generally consistent w...

  18. Aortic valve replacement in a patient with severe nickel allergy.

    Science.gov (United States)

    Lusini, Mario; Barbato, Raffaele; Spadaccio, Cristiano; Chello, Massimo

    2011-11-01

    Nickel allergy can raise clinical problems in patients undergoing cardiac surgery who require sternal closure with stainless steel wire. We describe the case of a 51-year-old woman with severe nickel allergy who underwent aortic valve replacement with a nickel-free ON-X prosthesis and sternal closure by Fiberwire # 2 suture without complications. Considering its biocompatibility and its mechanical characteristics including optimal strength and knot resistance, this suture might be a viable alternative in patients in which the use of stainless steel wire is contraindicated. © 2011 Wiley Periodicals, Inc.

  19. Licensing aspects of the NPP Temelin IandC replacement project

    International Nuclear Information System (INIS)

    Karpeta, C.

    1997-01-01

    The objections raised against the original design of the instrumentation and control system of the Temelin nuclear power plant are summarized. The nuclear regulatory environment of the Czech Republic is described; the activities of the State Office for Nuclear Safety (SONS) are highlighted. The requirements underlying the licensing of the Temelin IandC replacement project are discussed in some detail. The licensing process adopted by SONS is to a certain degree computer-aided. A database has been developed by SONS; the three-layer structure of the database is described. (A.K.)

  20. Gene replacement in Penicillium roqueforti.

    Science.gov (United States)

    Goarin, Anne; Silar, Philippe; Malagnac, Fabienne

    2015-05-01

    Most cheese-making filamentous fungi lack suitable molecular tools to improve their biotechnology potential. Penicillium roqueforti, a species of high industrial importance, would benefit from functional data yielded by molecular genetic approaches. This work provides the first example of gene replacement by homologous recombination in P. roqueforti, demonstrating that knockout experiments can be performed in this fungus. To do so, we improved the existing transformation method to integrate transgenes into P. roqueforti genome. In the meantime, we cloned the PrNiaD gene, which encodes a NADPH-dependent nitrate reductase that reduces nitrate to nitrite. Then, we performed a deletion of the PrNiaD gene from P. roqueforti strain AGO. The ΔPrNiaD mutant strain is more resistant to chlorate-containing medium than the wild-type strain, but did not grow on nitrate-containing medium. Because genomic data are now available, we believe that generating selective deletions of candidate genes will be a key step to open the way for a comprehensive exploration of gene function in P. roqueforti.