WorldWideScience

Sample records for rental equipment program

  1. Measuring Implicit Rental Rates for Farm Capital

    OpenAIRE

    Hrubovcak, James

    1986-01-01

    Developing implicit rental rates for capital inputs is an Important step in understanding the Impact of tax law changes on agricultural investments This article develops a methodology for estimating implicit rental rates and presents annual estimates of rental rates for seven categories of farm equipment and structures from 1955 to 1979 This article also compares these rental rates With those estimated under a no-tax alternative The author developed a method for estimating marginal Federal In...

  2. The Effectiveness Of Rental Housing Finance For Low-Income Households In Sombo Rental Flats Surabaya

    Directory of Open Access Journals (Sweden)

    Annisa Nur Ramadhani

    2017-07-01

    Full Text Available Fullfilment for the needs of housing is a priority that cannot be suspended especially in urban areas of developing country whose population continues to increase because of the rapid urbanization. Indonesia as the developing country still has a fairly high backlog approximately at 7.6 millions unit house in 2014 most of them are low income people. The Government has several plan in striving for the scarcity of housing. One of them is the development of rental flats which have goals for the social housing fulfillment for low income people and increase their housing affordability by lowering the rental rates. The intention is to assist the low income people save their money to buy their own homes. But in facts there are several constraints related to this rental flats finance such as late payment by the residents uncontroled right transfer and the tariff adjusted to the ability of the inhabitants can not cover the cost of the physical building management and maintanance. This study aims to evaluate Sombo rental flat finance for for low income people in which the data are collected through in depth interview observation and documentation. The results of several qualitatively descriptive analysis show that the effectiveness of rental flat financing in the aspect of the purpose and goal to facilitating low income community needs of housing is quiet accomplished. Beside that the organization is also well structured and have the efficient human resources. But Sombo rental flats effectivenes is relatively low in the aspect of profit ability rental financing program and in the enforcement of rules and regulation. The main problem is in the arrears of residents rental payment and the deficiency for maintanance cost so it has to depend on the city government subsidies. The rental finance constraint are caused by several factors which are historic factors residents factors and the vision and commitment of the city government to facilitate housing for low

  3. 24 CFR 982.622 - Manufactured home space rental: Rent to owner.

    Science.gov (United States)

    2010-04-01

    ..., DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SECTION 8 TENANT BASED ASSISTANCE: HOUSING CHOICE VOUCHER PROGRAM Special Housing Types Manufactured Home Space Rental § 982.622 Manufactured home space rental: Rent to owner. (a) What is included. (1) Rent to owner for rental of a manufactured home space includes payment...

  4. 24 CFR 401.421 - Rental Assistance Assessment Plan.

    Science.gov (United States)

    2010-04-01

    ... PROGRAM (MARK-TO-MARKET) Restructuring Plan § 401.421 Rental Assistance Assessment Plan. (a) Plan required..., comparable, and affordable housing in the local market; (2) The types of tenants residing in the project (such as elderly families, disabled families, large families, and cooperative homeowners); (3) The local...

  5. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  6. 25 CFR 226.9 - Rental and drilling obligations.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Rental and drilling obligations. 226.9 Section 226.9... RESERVATION LANDS FOR OIL AND GAS MINING Leasing Procedure, Rental and Royalty § 226.9 Rental and drilling... in the lease terms, or 12 months from the date the Superintendent consents to drilling on any...

  7. 30 CFR 281.27 - Annual rental.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Annual rental. 281.27 Section 281.27 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF MINERALS OTHER THAN OIL, GAS, AND SULPHUR IN THE OUTER CONTINENTAL SHELF Financial Considerations § 281.27 Annual rental...

  8. 49 CFR 23.55 - How do recipients count ACDBE participation toward goals for items other than car rentals?

    Science.gov (United States)

    2010-10-01

    ... goals for items other than car rentals? 23.55 Section 23.55 Transportation Office of the Secretary of... than car rentals? (a) You count only ACDBE participation that results from a commercially useful..., advertising, building cleaning and maintenance, computer programming, or managerial. (f) Count 100 percent of...

  9. 48 CFR 445.407 - Non-Government use of plant equipment.

    Science.gov (United States)

    2010-10-01

    ... plant equipment. 445.407 Section 445.407 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Contractor Use and Rental of Government Property 445.407 Non-Government use of plant equipment. Requests for non-Government use of plant equipment as...

  10. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  11. Competition between social and private rental housing

    NARCIS (Netherlands)

    Lennartz, C.

    2013-01-01

    In the context of shifting regulatory approaches and changing provision structures in many Western rental housing systems, the notion of competition between social and private rental housing has received increasing attention from practitioners and academic researchers. This thesis explores and

  12. 24 CFR 92.252 - Qualification as affordable housing: Rental housing.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Qualification as affordable housing: Rental housing. 92.252 Section 92.252 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM Project Requirements § 92.252...

  13. Energy-Efficiency Retrofits in Small-Scale Multifamily Rental Housing: A Business Model

    Science.gov (United States)

    DeChambeau, Brian

    The goal of this thesis to develop a real estate investment model that creates a financial incentive for property owners to perform energy efficiency retrofits in small multifamily rental housing in southern New England. The medium for this argument is a business plan that is backed by a review of the literature and input from industry experts. In addition to industry expertise, the research covers four main areas: the context of green building, efficient building technologies, precedent programs, and the Providence, RI real estate market for the business plan. The thesis concludes that the model proposed can improve the profitability of real estate investment in small multifamily rental properties, though the extent to which this is possible depends partially on utility-run incentive programs and the capital available to invest in retrofit measures.

  14. 48 CFR 31.205-36 - Rental costs.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Rental costs. 31.205-36... CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.205-36 Rental costs. (a) This subsection is applicable to the cost of renting or leasing real or...

  15. Designing a New Car Rental Service Using Location-Based Services

    OpenAIRE

    Dessie, Solomon

    2015-01-01

    This thesis concentrates on improving the car rental services offered by the case company by introducing location-based services. For many years, the company has conducted a rental business in a similar manner with other car rental companies, and now it is introducing a new service system based on online interaction and location-based services. The outcome of the study is a blueprint for the case company regarding the design of a car rental service using location-based services. This stud...

  16. 26 CFR 1.467-5 - Section 467 rental agreements with variable interest.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 6 2010-04-01 2010-04-01 false Section 467 rental agreements with variable... rental agreements with variable interest. (a) Variable interest on deferred or prepaid rent—(1) In... 467 rental agreements providing variable interest. For purposes of this section, a rental agreement...

  17. 26 CFR 1.469-9 - Rules for certain rental real estate activities.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 6 2010-04-01 2010-04-01 false Rules for certain rental real estate activities... certain rental real estate activities. (a) Scope and purpose. This section provides guidance to taxpayers... rental real estate, including any interest in rental real estate that gives rise to deductions under...

  18. The Demand for Rental Homes in Denmark

    DEFF Research Database (Denmark)

    Skak, Morten

    2007-01-01

    For a number of years, homeownership rates have been increasing along with increasing GDP per capita in most European countries, but not in Denmark after 2000. Why have increased real incomes kept the demand for rental housing up in Denmark? The present paper takes a closer look at the Danish dev...... traits found on the Danish housing market and the technique employed for prediction are of interest to housing researchers in other countries.......For a number of years, homeownership rates have been increasing along with increasing GDP per capita in most European countries, but not in Denmark after 2000. Why have increased real incomes kept the demand for rental housing up in Denmark? The present paper takes a closer look at the Danish...... development, and gives some indications of the future demand for rental housing in Denmark. The results indicate a future stagnant rental demand kept up by an increasing share of persons of old age and young persons undergoing education, and thus a rising homeownership rate. It is believed that the structural...

  19. THE ALLOCATIVE EFFICIENCY OF LAND RENTAL MARKETS IN TRANSITION AGRICULTURE

    OpenAIRE

    Vranken, Liesbet; Mathijs, Erik

    2001-01-01

    This paper examines the functioning of the Hungarian land rental market. The allocative inefficiency of the land rental market is determined by calculating the marginal value productivity of land and using rental prices. Regional differences in allocative inefficiency are then correlated with demographic and socio-economic variables and with labor market-related factors.

  20. Adaptation Model for Corporate Car Sharing in the Car Rental Industry

    OpenAIRE

    Matthes, Martin

    2016-01-01

    The focus of this thesis was on developing an adaption model for implementing a corporate car sharing service within the existing infrastructure of a car rental company. The investigated case companies were a leading Finnish car rental franchisee and an international car sharing subsidiary, largely owned by the car rental franchisor, which offers corporate car sharing solutions in major European countries. Adapting this new service in Finland will help the car rental franchisee to assert its ...

  1. Rental Housing Finance Survey

    Data.gov (United States)

    Department of Housing and Urban Development — The purpose of the RHFS is to provide current and continuous measure of the financial health and property characteristics of single-family and multifamily rental...

  2. 30 CFR 218.101 - Royalty and rental remittance (naval petroleum reserves).

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Royalty and rental remittance (naval petroleum... INCENTIVES Oil and Gas, Onshore § 218.101 Royalty and rental remittance (naval petroleum reserves). Remittance covering payments of royalty or rental on naval petroleum reserves must be accomplished by...

  3. A System for Recommending Rental Properties

    Directory of Open Access Journals (Sweden)

    Bernard Shibwabo Kasamani

    2017-07-01

    Full Text Available This paper presents an implementation of recommender technology to online search of rental properties. In particular, the paper uses the preference-based search approach combined with a technique called example-critiquing. Rather than perform a query against the database, this approach prompts the user to express some preferences on rental properties, uses them to construct a preference model for the user, and finally generates a list of properties that best match that preferences. The system is developed as Web application using the Ruby on Rails framework

  4. Business Plan: Video Game Rental Store

    OpenAIRE

    Kemppi, Tuomas

    2013-01-01

    The purpose of this report is to create a business plan for a video game rental store. It includes research on similar companies in other countries, and it determines if the concept would work in Finland. In addition to this, the report also includes research on what steps need to be taken in order to start and run a video game rental business in Finland. The report also goes over the current trends in the video game industry, and takes a look at where the industry is heading. Based...

  5. 49 CFR 1242.42 - Administration, repair and maintenance, machinery repair, equipment damaged, dismantling retired...

    Science.gov (United States)

    2010-10-01

    ... repair, equipment damaged, dismantling retired property, fringe benefits, other casualties and insurance, lease rentals, joint facility rents, other rents, depreciation, joint facility, repairs billed to others... maintenance, machinery repair, equipment damaged, dismantling retired property, fringe benefits, other...

  6. Financing R & D with Knowledge Stock Rentals

    OpenAIRE

    John M. Hartwick

    1993-01-01

    We set out an endogenous growth model along the lines of Romer(1990) and investigate the implications of financing new knowledge production (R&D) with rental income accruing to the knowledge stock used in goods production. The knowledge stock is a non-public input in goods production. The balance growth rate under optimal growth can be greater or less than that under the invest knowledge stock rentals regime depends on the parameters of the production function and not on the parameters of pre...

  7. 34 CFR 607.10 - What activities may and may not be carried out under a grant?

    Science.gov (United States)

    2010-07-01

    ... experience that is part of an approved academic program at off-campus locations; (6) Developing or improving... administrative authority and responsibility; (8) Purchase, rental, or lease of scientific or laboratory equipment... academic instruction capabilities, including purchase or rental of telecommunications technology equipment...

  8. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  9. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  10. 18 CFR 367.4180 - Account 418, Non-operating rental income.

    Science.gov (United States)

    2010-04-01

    ... GAS ACT Income Statement Chart of Accounts Service Company Operating Income § 367.4180 Account 418, Non-operating rental income. (a) The expenses shall include all elements of costs incurred in the...-operating rental income. 367.4180 Section 367.4180 Conservation of Power and Water Resources FEDERAL ENERGY...

  11. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  12. A rental car strategy for commercialization of hydrogen in Florida

    Energy Technology Data Exchange (ETDEWEB)

    Lines, Lee [Department of Environmental Studies, Rollins College, 1000 Holt Avenue, Box 2753, Winter Park, FL 32789-4499 (United States); Kuby, Michael; Clancy, James [School of Geographical Sciences, Arizona State University, Tempe, AZ 85287-5302 (United States); Schultz, Ronald; Xie, Zhixiao [Department of Geosciences, Florida Atlantic University, 777 Glades Road, Boca Raton, FL 33431 (United States)

    2008-10-15

    This article proposes a hydrogen rental-car strategy for transitioning from fleets to consumers in Orlando, Florida. Orlando is the No. 1 tourist destination in the United States, but most car renters visit only a few destinations. A hydrogen rental-car fleet serving this cluster of destinations could provide visitors with a positive first exposure to hydrogen vehicles with minimal commitment, creating hydrogen advocates and potential early adopters in their home regions. The rental-car business combines the logistical advantages of a fleet operation with outreach to many consumers. A hydrogen-powered rental-car fleet at the Orlando International Airport could provide guaranteed demand, supporting an initial rollout of refueling stations. We surveyed 435 rental-car customers in Orlando to understand the idea from the consumer point of view. We analyzed the bundles of destinations visited by the respondents and found that only three stations - an existing station at the Orlando International Airport plus new stations near the theme parks and in downtown Orlando - could serve 64% of renters. Half of all respondents indicated a willingness to pay more to rent a hydrogen car, and this subset of customers ranked the ability to use a pollution-free car as the most important factor in their decision. We then identify the major barriers to a hydrogen rental-car business model from the corporate point of view and propose a number of potential solutions. The most significant barrier appears to be the fleet purchase costs, which we think can be offset by the benefits of free media coverage and contained by beginning with converted internal-combustion vehicles and converting eventually to fuel-cell vehicles. We also outline possible synergies with NASA, Disney, refueling stations, manufacturers and state government. (author)

  13. 48 CFR 1845.407 - Non-Government use of plant equipment. (NASA supplements paragraph (a)).

    Science.gov (United States)

    2010-10-01

    ... Use and Rental of Government Property 1845.407 Non-Government use of plant equipment. (NASA supplements paragraph (a)). For NASA, the coverage in FAR 45.407, applies to all equipment, not just plant... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Non-Government use of plant...

  14. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  15. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  16. Cost analysis for heavy equipment in earthfill work - An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

    Science.gov (United States)

    Arifin, Muhammad Faizal Ardhiansyah

    2017-03-01

    Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.

  17. 26 CFR 514.5 - Patent and copyright royalties and film rentals.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 19 2010-04-01 2010-04-01 false Patent and copyright royalties and film rentals...) REGULATIONS UNDER TAX CONVENTIONS FRANCE Withholding of Tax § 514.5 Patent and copyright royalties and film rentals. (a) Exemption from tax. Royalties for the right to use copyrights, patents, designs, secret...

  18. 15 CFR 9.3 - Appliances and equipment included in program.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Appliances and equipment included in... VOLUNTARY LABELING PROGRAM FOR HOUSEHOLD APPLIANCES AND EQUIPMENT TO EFFECT ENERGY CONSERVATION § 9.3 Appliances and equipment included in program. The appliances and equipment included in this program are room...

  19. A compliance testing program for diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Hutchinson, D.E.; Cobb, B.J.; Jacob, C.S.

    1999-01-01

    Compliance testing is nominally that part of a quality assurance program dealing with those aspects of X-ray equipment performance that are subject to radiation control legislation. Quality assurance programs for medical X-ray equipment should be an integral part of the quality culture in health care. However while major hospitals and individual medical centers may implement such programs with some diligence, much X-ray equipment can remain unappraised unless there is a comprehensive regulatory inspection program or some form of compulsion on the equipment owner to implement a testing program. Since the late 1950s all X-ray equipment in the State of Western Australia has been inspected by authorized officers acting on behalf of the Radiological Council, the regulatory authority responsible for administration of the State's Radiation Safety Act. However, economic constraints, coupled with increasing X-ray equipment numbers and a geographically large State have significantly affected the inspection rate. Data available from inspections demonstrate that regular compliance and performance checks are essential in order to ensure proper performance and to minimize unnecessary patient and operator dose. To ensure that diagnostic X-ray equipment complies with accepted standards and performance criteria, the regulatory authority introduced a compulsory compliance testing program for all medical, dental and chiropractic diagnostic X-ray equipment effective from 1 January 1997

  20. Pembuatan Sistem Informasi Rental Mobil dengan Menggunakan Java dan Mysql

    Directory of Open Access Journals (Sweden)

    Annisa Rahmawati

    2015-08-01

    Full Text Available Pangsa pasar yang semakin berkembang di berbagai bidang usaha khususnya pada jasa, membuat sistem pembukuan penjualan yang belum menggunakan komputer menjadi tidak efektif. Salah satu contoh bidang usaha tersebut adalah usaha rental mobil. Proses pengolahan data transaksi perusahaan tersebut semakin tidak akurat dan lambat seiring dengan meningkatnya transaksi yang dilakukan. Atas dasar tersebut digunakan Sistem Informasi Rental Mobil yang berbasis komputer sehingga lebih cepat dan akurat. Sistem Informasi tersebut dibuat dengan menggunakan bahasa pemrograman Java dan menggunakan database MySQL yang tertanam langsung pada aplikasi. Proses pembuatan dan pengembangan Sistem Informasi Rental Mobil ini menggunakan metode SDLC (Software Development Life Cycle model air terjun. Hasil dari perancangan aplikasi ini adalah suatu aplikasi desktop yang dapat memudahkan pengguna dalam pencarian mobil yang sedang tersedia, penagihan pembayaran dan pengembalian mobil jika batas waktu pengembalian sudah tiba.

  1. Rental Values in UK Shopping Malls

    NARCIS (Netherlands)

    Yuo, Tony Shun-Te; Lizieri, Colin; McCann, Phillip; Crosby, Neil

    This paper employs a unique dataset to analyse the retail rental levels of 1108 retail tenants in 148 UK regional shopping malls. The dataset integrates information regarding the characteristics of the shopping centre, the individual retailer, the brand, the individual unit occupied, the tenancy

  2. Tenure security, social relations and contract choice: Endogenous matching in the Chinese land rental market

    Science.gov (United States)

    Ma, Xianlei; Zhou, Yuepeng; Shi, Xiaoping

    2017-04-01

    In China, land rental transactions have increased considerably since the 1990s, but there exists a high degree of segmentation and informal features. The rental transactions between partners with close social relations and the use of informal contracts remain a common phenomenon in many regions, which strongly reduce the potential of the land rental market to enhance productivity and equity. The current literature postulates that the insecurity of land property rights may restrict land transactions between members of same social relations. Studies conducted in China show that the land rentals between partners with closer social relations prefer informal contracts because these contracts are self-enforced based on trust and reputation. However, little literature has jointly examined the effect of land tenure security and social relations on joint decisions of partner and contract choice in the Chinese land rental market. Based on household data collected in Jiangxi and Liaoning provinces in 2015, this paper aims to examine the relationship between land tenure security perceptions, social relation and land rental contract choices in China. We differentiate between formal and informal contracts of land rental activities because they have different enforcement mechanisms and thus different risk-sharing strategy. With regards to social relations, we differ among relatives, villagers living in the same village and strangers according to social distance. In order to reduce estimation bias without accounting for endogenous matching between landlords and tenants, we investigate the joint partner and contract choices in the land rental market using a nested logit framework. The paper contributes to the literature on the effect of tenure security and social relations on land rental contracts by (i) taking into account endogenous matching between landlords and tenants, and estimating the joint decisions of partner and contract choice, and (ii) examining the effect of perceived

  3. 17 CFR 210.12-24 - Real estate owned and rental income. 1

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Real estate owned and rental... § 210.12-24 Real estate owned and rental income. 1 Part 1—Real estate owned at end of period Column A... In a separate schedule classify by states in which the real estate owned is located the total amounts...

  4. 77 FR 49004 - Notice of Proposed Information Collection for Public Comment; Rental Assistance Demonstration...

    Science.gov (United States)

    2012-08-15

    ... rental assistance contracts; and Rent Supplement (Rent Supp), Rental Assistance Payment (RAP) and Mod Rehab properties upon contract expiration or termination, to convert Tenant Protection Vouchers (TPVs) to Project Based Vouchers (PBVs). Participation in the initiative will be voluntary; the attached...

  5. 77 FR 14410 - Notice of Proposed Information Collection for Public Comment: Rental Assistance Demonstration...

    Science.gov (United States)

    2012-03-09

    ... rental assistance contracts; and Rent Supplement, Rental Assistance Payment and Mod Rehab properties upon contract expiration or termination, to convert tenant protection vouchers (TPVs) to project- based vouchers... Assistance Payment (RAP), and Mod Rehab properties, upon contract expiration or termination, to convert...

  6. Student Housing a Resilient Housing Rental Market: Case of Federal Polytechnic Neighbourhood Bauchi, Nigeria

    Directory of Open Access Journals (Sweden)

    Zubairu Abubakar Ghani

    2018-03-01

    Full Text Available In the last three decades globally higher institutions (HIs have been experiencing an unprecedented upsurge in student population and student enrolment in His generally outstrip the HIs student housing. In many countries of the world like Nigeria, HIs are obviously incapacitated in accommodating the growing student population which compelled numerous students to overflow into their HIs’ neighbourhood seeking for alternative housing accommodation in the private housing rental market. Indeed the scenario of HIs student's housing shortfalls and increasing students housing demand evolved the interest of many people in a student housing rental market. This is because it has been uncovered that business in student housing rental is lucrative and guaranteeing business that ensured profit for a long term. This paper, therefore, explores the nature and landscape of student housing rental in Nigeria where the business is immature then drawn the conclusion.

  7. Environmental qualification program of electric equipment for Angra 1

    Energy Technology Data Exchange (ETDEWEB)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C., E-mail: grazi@eletronuclear.gov.br, E-mail: justino@eletronuclear.gov.br, E-mail: candeia@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2017-11-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  8. Environmental qualification program of electric equipment for Angra 1

    International Nuclear Information System (INIS)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C.

    2017-01-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  9. Human performance for the success of equipment reliability programs

    International Nuclear Information System (INIS)

    Woodcock, J.

    2007-01-01

    Human performance is a critical element of programs directed at equipment reliability. Reliable equipment performance requires broad support from all levels of plant management and throughout all plant departments. Experience at both nuclear power plants and fuel manufacturing plants shows that human performance must be addressed during all phases of program implementation from the beginning through the establishment of a living, on-going process. At the beginning, certain organizational and management actions during the initiation of the program set the stage for successful adoption by station personnel, leading to more rapid benefits. For the long term, equipment reliability is a living process needed throughout the lifetime of a station, a program which must be motivated and measured. Sustained acceptance and participation by the plant personnel is a requirement, and culture is a key ingredient. This paper will provide an overview of key human performance issues to be considered, using the application of the INPO AP-913 Equipment Reliability Guideline as a basis and gives some best practices for training, communicating and implementing programs. The very last part includes ways to tell if the program is effective

  10. 30 CFR 218.151 - Rental fees.

    Science.gov (United States)

    2010-07-01

    ... MONIES AND PROVISION FOR GEOTHERMAL CREDITS AND INCENTIVES Oil, Gas and Sulfur, Offshore § 218.151 Rental... this section. Discovery means one or more wells on the lease that meet the requirements in 250, subpart... (c) of this section. For— Issued as a result of a sale held— The lessee must pay rental— (1) An oil...

  11. Aplikasi Sewa Mobil Berbasis Web pada PT Indomobil Car Rental

    Directory of Open Access Journals (Sweden)

    Tri Pujadi

    2011-06-01

    Full Text Available Indomobil Car Rental (IndoRent is a rental firm providing service to customer by provides vehicle and qualified drivers. Firm has extensive network by utilizes all network from Indomobil Group. Besides it also have care service network that exists at several big cities in Indonesia. Common service problems for customer is limitation of the number of drivers to service customer, particularly at the busy days where it is difficult for customers to do reservation and get information to rent a car. Company website does not provide rent price and car amount information. This application design is developed from a financial application system therefore making it easy for users to conduct activity or transactions and service that progressively increases. Method for modelling by use of Rational Rose, meanwhile design web application utilizes Macromedia Dreamweaver, and Macromedia Flash MX and Swishmax for its animation.This application utilizes PHP and MySQL. The website of Indomobil Rental Car is expected to be more dynamic and can pull more visitors its, so increases firm performance. 

  12. Land Reform and Farm Land Rental Market Operation in the Northern Uplands of Vietnam

    Directory of Open Access Journals (Sweden)

    Nguyen Trung THANH

    2009-01-01

    Full Text Available This paper examines the factors affecting the participation of farmhouseholds in farm land rental markets with particular focus on the impact ofthe land reform. The operational outcomes of such market participation are alsoanalysed. The study used a panel dataset of farm households surveyed beforeand after the land reform with Random Effect Tobit model. The analysisshowed that the land reform have contributed to increased land rentalparticipation. The operation of the market has both efficiency and equityoutcomes. Therefore, constraints to functioning of land rental market aredifficult to justify. In other words, farm land rental should be promoted to bringsuch desirable outcomes.

  13. 24 CFR 1000.103 - How may IHBG funds be used for tenant-based or project-based rental assistance?

    Science.gov (United States)

    2010-04-01

    ... Housing Activities § 1000.103 How may IHBG funds be used for tenant-based or project-based rental assistance? (a) IHBG funds may be used for project-based or tenant-based rental assistance. (b) IHBG funds may be used for project-based or tenant-based rental assistance that is provided in a manner...

  14. An Iterative Algorithm for the Management of an Electric Car-Rental Service

    Directory of Open Access Journals (Sweden)

    J. Alberto Conejero

    2014-01-01

    Full Text Available The management of a car-rental service becomes more complex as long as one-way bookings between different depots are accepted. These bookings can increase the operational costs due to the necessity of moving vehicles from one depot to another by the company staff in order to attend previously accepted bookings. We present an iterative model based on flows on networks for the acceptance of bookings by a car-rental service that permits one-way reservations. Our model lets us also recover the movement of the fleet of vehicles between the depots over the time. In addition, it also permits including restrictions on the amount of cars managed at every single depot. These results can be of interest for an electric car-rental service that operates at different depots within a city or region.

  15. 24 CFR 891.810 - Project rental assistance.

    Science.gov (United States)

    2010-04-01

    ... Partnerships and Mixed-Finance Development for Supportive Housing for the Elderly or Persons with Disabilities..., subject to the provisions of 24 CFR 891.445. The sponsor of a mixed-finance development must obtain the necessary funds from a source other than project rental assistance funds for operating costs related to non...

  16. Analysis of market signals in a competitive electricity market using components of network rental

    International Nuclear Information System (INIS)

    Amarasinghe, L.Y.C.; Annakkage, U.D.

    2009-01-01

    In the competitive electricity market, Locational Marginal Prices (LMPs) are important pricing signals for the participants as the effects of transmission losses and binding constraints are embedded in LMPs. While these LMPs provide valuable information at each location, they do not provide a detailed description in terms of contributing terms. The LMP components, on the other hand, show the explicit decomposition of LMP into contributing components, and thus, can be considered as better market signals. However, the effects of transmission losses cannot be explicitly seen from the LMP components. In this paper, the components of network rental is proposed to be used as a method in analyzing market signals, by decomposing the network rental into contributing components among the consumers. Since, the network rental is the surplus paid by all the consumers, components of network rental show how each consumer has actually overpaid due to losses and each binding constraint separately. A case study is also presented to demonstrate the potential of this proposed method in market signal analysis. (author)

  17. How do land rental markets affect household income? Evidence from rural Jiangsu, P.R. China

    NARCIS (Netherlands)

    Zhang, Lan; Feng, Shuyi; Heerink, Nico; Qu, Futian; Kuyvenhoven, Arie

    2018-01-01

    The development of land rental markets in developing countries attracts much attention, but little is known about its impact on household income. This study empirically examines the effects of land rental decisions of farm households on their income and income components, i.e. farm, off-farm and

  18. DoD and DOS Need Better Procedures to Monitor and Expend DoD Funds for the Afghan National Police Training Program

    Science.gov (United States)

    2011-07-07

    charged the Government for unreasonable roundtrip airline tickets, a one day rental car and parking fees of $104 even though other transportation...purchases was based on high dollar values, and the items included equipment, parts, cell phones, catered meals, fuel, and rental vehicles listed on 10

  19. Boosting program integrity and effectiveness of the cognitive behavioral program EQUIP for incarcerated youth in The Netherlands

    NARCIS (Netherlands)

    Helmond, P.; Overbeek, G.; Brugman, D.

    2014-01-01

    This study examined whether a "program integrity booster" could improve the low to moderate program integrity and effectiveness of the EQUIP program for incarcerated youth as practiced in The Netherlands. Program integrity was assessed in EQUIP groups before and after the booster. Youth residing in

  20. Box Energy: rental of energy-storage systems and alternative fuel technologies for vehicles; Box-energy. Rental of energy. Storage systems and alternative-fuel. Technologies for vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bautz, R.

    2004-07-01

    This report for the Swiss Federal Office of Energy (SFOE) presents the results of study on the rental of energy-storage systems and alternative fuel technologies for vehicles. Experience gained in the area of battery-rental is discussed. The aims of the 'Box Energy' project are described, as is its market environment. The 'Box Energy' concept is described and possible customers and partners listed. Logistics aspects are discussed. The organisation of 'Box Energy' is described and the concept's chances and weaknesses are discussed. The launching of a pilot project in Switzerland is discussed. Recommendations on further work to be done are made.

  1. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  2. Farmland Rental and Productivity of Wheat and Maize: An Empirical Study in Gansu, China

    Directory of Open Access Journals (Sweden)

    Ying Liu

    2017-09-01

    Full Text Available The rapid growth of farmland rental markets in China raises questions about the association of farmland rental and agricultural productivity. Although this issue has been extensively studied, the majority of studies have focused on yields and technical efficiency, with input use and cost efficiency receiving little attention. This study aimed to determine the statistical association of wheat and maize farmers’ farmland rental behaviors (renting land, not renting land and renting out land and input use, and the consequent association of farmers’ farmland rental behaviors and cost efficiency. For this purpose, the linear regression model and stochastic frontier model were employed, based on a survey data of 419 wheat and maize farmers in 25 villages in five counties of Gansu Province, China. The study found that farmland rental enhanced productivity and sustainability of agriculture through transferring farmland from households with less productivity to those with high productivity, and it was also helpful to reducing the consumption of fertilizers and chemicals in agricultural production. The results suggest that replacing labor with machines is an important way to reduce production costs, and households specializing in agricultural production use more rational amounts of fertilizers and chemicals than those with low productivity. Thus, the machinery purchase policy in China should continue to give great benefit to farmers. In addition, the machinery purchase subsidization policy has achieved satisfactory results in China, and it could be a good reference for other developing countries. However, some efficiency loss was found in households that rented out their land, and policy makers need to pay some attention to these households.

  3. Application of quality assurance program to safety related aging equipment or components

    International Nuclear Information System (INIS)

    Papaiya, N.C.

    1990-01-01

    This paper addresses how quality assurance programs and their criteria are applied to safety related and aging equipment or components used in commercial nuclear plant applications. The QA Programs referred to are 10CFR50 Appendix B and EPRI NP-5652. The QA programs as applicable are applied to equipment/component aging qualification, preventive maintenance, surveillance testing and procurement engineering. The intent of this paper is not the technical issues, methods and research of aging. The paper addresses QA program's application to age-related equipment or components in safety related applications. Quality Assurance Program 10CFR50 Appendix B applies to all safety related aging components or equipment related to the qualification program and associated preventive maintenance and surveillance testing programs. Quality Assurance involvement with procurement engineering for age-related commercial grade items supports EPRI NP-5652 and assures that the dedicated OGI is equal to the item purchased as a basic component to 10CFR50 Appendix B requirements

  4. 77 FR 44654 - Rental Assistance Demonstration (RAD) Application Form

    Science.gov (United States)

    2012-07-30

    ... sustainability of properties and enable owners to leverage private financing to address immediate and long-term... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5603-N-52] Rental Assistance... Public Housing and Moderate Rehabilitation (Mod Rehab) properties to convert to long-term Section 8...

  5. Office Rental Performance in the Commercial Property Market in ...

    African Journals Online (AJOL)

    and policies towards sustained tax benefits of office property rental growth in the city. Keywords: Abuja ... estate returns. They found significant differences between correlation coefficient of returns among the areas. This suggests that there are real estate market differences between ..... Singapore, Hong Kong, Taipei, Kuala.

  6. Energy efficiency in U.S. residential rental housing: Adoption rates and impact on rent

    International Nuclear Information System (INIS)

    Im, Jongho; Seo, Youngme; Cetin, Kristen S.; Singh, Jasmeet

    2017-01-01

    Highlights: •Rental units listings collected and analyzed for 10 U.S. cities. •Energy efficient features included in 5.3–21.6% of rental units in each city. •The most common efficient features are lighting and appliance upgrades. •Propensity score matching and conditional mean comparison methods used. •Generally, energy efficient features increases the units’ rent, overall from 6% to 14%. -- Abstract: For 118 million residential housing units in the U.S., there is currently a gap between the potential energy savings that can be achieved through the use of existing energy efficiency technologies, and the actual level of energy savings realized, particularly for the 37% of housing units that are considered residential rental properties. Additional quantifiable benefits are needed beyond energy savings to help further motivate residential property owners to invest in energy efficiency upgrades. This research focuses on assessing the adoption of energy efficient upgrades in U.S. residential housing and the impact on rental prices. Ten U.S. cities are chosen for analysis; these cities vary in size across multiple climate zones, and represent a diverse set of housing market conditions. Data was collected for over 159,000 rental property listings, their characteristics, and their energy efficiency measures listed in rental housing postings across each city. Following an extensive data quality control process, over thirty different types energy efficient features were identified. The level of adoption was determined for each city, ranging from 5.3% to 21.6%. Efficient lighting and appliances were among the most common, with many features doubling as energy efficient and other desirable aesthetic or comfort improvements. Then using propensity score matching and conditional mean comparison methods, the relative impact on rent charged in each city was calculated, which ranged from a 6% to 14.1% increase in rent for properties with energy efficient features

  7. Towards smoke-free rental cars: an evaluation of voluntary smoking restrictions in California.

    Science.gov (United States)

    Matt, Georg E; Fortmann, Addie L; Quintana, Penelope J E; Zakarian, Joy M; Romero, Romina A; Chatfield, Dale A; Hoh, Eunha; Hovell, Melbourne F

    2013-05-01

    Some car rental companies in California and other states in the USA have established non-smoking policies for their vehicles. This study examined the effectiveness of these policies in maintaining smoke-free rental cars. A stratified random sample of 250 cars (non-smoker, smoker and unknown designation) was examined in San Diego County, California, USA. Dust, surfaces and the air of each vehicle cabin were sampled and analysed for residual tobacco smoke pollutants (also known as thirdhand smoke (THS)), and each car was inspected for visual and olfactory signs of tobacco use. Customer service representatives were informally interviewed about smoking policies. A majority of putative non-smoker cars had nicotine in dust, on surfaces, in air and other signs of tobacco use. Independent of a car's smoking status, older and higher mileage cars had higher levels of THS pollution in dust and on surfaces (pcars, non-smoker cars had lower levels of nicotine on surfaces (pcars was associated with lower levels of THS pollutants in dust and air (pcars compared with smoker cars. However, policies failed in providing smoke-free rental cars; THS levels were not as low as those found in private cars of non-smokers with in-car smoking bans. Major obstacles include inconsistent communication with customers and the lack of routine monitoring and enforcement strategies. Strengthening policies and their implementation would allow car rental companies to reduce costs, better serve their customers and make a constructive contribution to tobacco control efforts.

  8. 20 CFR 404.1082 - Rentals from real estate; material participation.

    Science.gov (United States)

    2010-04-01

    ... a real estate dealer if you are engaged in the business of selling real estate to customers for... convenience and are other than those usually provided in connection with the rental of rooms or other space...

  9. 1 Office Rental Determinants in WUSE Commercial District of Abuja ...

    African Journals Online (AJOL)

    2015-05-07

    May 7, 2015 ... property market in the study area as they account for between 74% ... participants such as investors and developers often use rental value as an .... research direction and information requirements of current European property.

  10. 7 CFR 15b.41 - Multi-family rental housing.

    Science.gov (United States)

    2010-01-01

    ... accessbile and (2) consideration of approval to commit project reserve account funds for minor modifications... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Other Aid, Benefits, or Services § 15b.41 Multi-family... multi-family rental housing projects constructed after the effective date of this part shall construct...

  11. 44 CFR 361.8 - Ineligible expenditures.

    Science.gov (United States)

    2010-10-01

    ... OF HOMELAND SECURITY PREPAREDNESS NATIONAL EARTHQUAKE HAZARDS REDUCTION ASSISTANCE TO STATE AND LOCAL GOVERNMENTS Earthquake Hazards Reduction Assistance Program § 361.8 Ineligible expenditures. (a) Expenditures... for the purchase or rental of any equipment such as radio/telephone communications equipment, warning...

  12. RENTAL INCOME AND CAP RATES: A COMPARISON OF THE LISBON AND PORTO HOUSING MARKETS

    Directory of Open Access Journals (Sweden)

    António C. MOREIRA

    2016-12-01

    Full Text Available The goal of this article is to analyse the relationship between rental income and capitalisation rates when real estate value is assessed in parishes of the Lisbon and Porto municipalities. Based on housing market values in euros per square metre during the 2006-2009 period, the income approach was used to compare the two main types of apartments (i.e. B2, or two-bedroom, and B1, or one-bedroom in Lisbon and Porto. We used the capital asset pricing model to calculate the risk measure. The cluster analysis was used to group the Lisbon and Porto parishes according to their rental income and capitalisation rates. Regressions were used to model both geographical markets. Clear differences were found between Porto and Lisbon, the results being more robust for the Porto municipality in regard to B2 apartments. Moreover, rental income is inversely proportional to capitalisation rates for B1 apartments for Porto parishes, which means that there is an initial overinvestment.

  13. The effect of urban trees on the rental price of single-family homes in Portland, Oregon

    Science.gov (United States)

    Geoffrey H. Donovan; David T. Butry

    2011-01-01

    Few studies have estimated the effect of environmental amenities on the rental price of houses. We address this gap in the literature by quantifying the effect of urban trees on the rental price of single-family homes in Portland, Oregon, USA. We found that an additional tree on a house's lot increased monthly rent by $5.62, and a tree in the public right of way...

  14. Office Rental Determinants in WUSE Commercial District of Abuja ...

    African Journals Online (AJOL)

    This paper examines the determinants of office rents in Wuse commercial district of Abuja, Nigeria. Primary and secondary data were utilized for the study. Primary data obtained for the study include office rental levels and office space data in the study area for the period between 2001 and 2012. Secondary data obtained ...

  15. Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Riggin, Stacey H.; Hansen, H. Jerome

    1992-10-01

    The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat

  16. The Design of Local-Authority Rental Housing for the Elderly That Improves Their Quality of Life

    Directory of Open Access Journals (Sweden)

    Yukiko Kuboshima

    2018-05-01

    Full Text Available As the population ages, the demand for suitable rental housing will increase. Suitable housing means housing that can accommodate those impairments that typically correspond with ageing. This paper explores the quality of life (QoL requirements of those elderly with high-care needs who live in rental housing. Using a qualitative case study approach, it examines the living experiences of six elderly people who need assistance and are living in local-authority rental housing in New Zealand. The themes of QoL were identified from the literature and related to the larger themes of; 1. Activities and independence, 2. Sense of control, 3. Privacy, 4. Relationships, 5. Quality of care, and 6. Comfort. The survey consisted of a detailed documentation of the physical environment, followed by interviews with and full-day observations of the residents and their caregivers. The study finds that the design of housing that improves their QoL requires solutions to accommodate the various conflicting needs for their QoL that include those derived from the diversity in the user’s preferences and impairments. In the design of rental housing, there is greater need for additional or reorganized space to accommodate caregivers and visitors, maintain residents’ independence, privacy, and other aspects important for their QoL.

  17. Urban Floods and Residential Rental Values Nexus in Kumasi, Ghana

    African Journals Online (AJOL)

    The study adopted multiple research approaches in selecting zones with both flood ... highlight the increasing evidence of negativity on houses and their values in terms of ... The potential for floods to wipeout housing wealth accumulated over ... In addition, locations do influence residential rental values through tangible or.

  18. 26 CFR 1.107-1 - Rental value of parsonages.

    Science.gov (United States)

    2010-04-01

    ... allowance paid to him as part of his compensation to the extent such allowance is used by him to rent or... minister as an employee of the United States (other than as a chaplain in the Armed Forces, whose service... minister to rent or otherwise provide a home if such amount is designated as rental allowance pursuant to...

  19. Effect of Environmental Quality on Property Rental Values in Peri ...

    African Journals Online (AJOL)

    The study examined the effect of environmental quality on rental values of residential accommodation at the peripheral neighbourhoods of Minna, Nigeria. Cluster sampling method was employed in the selection of sampled areas and, six neighbourhoods were randomly selected. Sample size of 600 was drawn out of the ...

  20. Impact of HVOTLs on Residential Property Rental Values in High ...

    African Journals Online (AJOL)

    The study encouraged the use of buried armour cables instead of overhead power-lines in future and the strict enforcement of ROWs within Lagos metropolis where power-lines already exist, in a bid to abate the effect of power line on property investments. Keywords: HVOTLs, Power-line, Residential, Property, Rental ...

  1. Present situation and necessity of computer programmed X-ray equipment

    International Nuclear Information System (INIS)

    Shiraishi, Junji; Hatagawa, Masakatsu

    1989-01-01

    In order to take radiographic photos, it is necessary to know a great deal of information. For example, mA, kV, exposure time, screen, grid, phototimer, etc. In this study, we examined 4 widely-used types computer-programmed X-ray equipment. These computer-assisted processes are designed to look at the data and make programmed individual decisions. The purpose is to reduce the differences in radiographic quality and the risk of retaking caused by the differences in experience among technicians. We concluded that none of them has ideal functions but each can be used as a source supply information, if a little remodeling is done, and we confirm that computer-programmed X-ray equipment is, and will continue to go be, necessary. (author)

  2. Exploring the spatial variation in quality-adjusted rental prices and identifying hot spots in Berlin’s residential property market

    DEFF Research Database (Denmark)

    Meulen, Philipp an de; Mitze, Timo Friedel

    2014-01-01

    In this work, we use residual values obtained from an estimated hedonic pricing model to assess the role of district-level neighbourhood effects for the spatial variation in quality-adjusted rental prices in Berlin between 2008 and 2013. By doing so, we also aim at identifying hot and cold spots ...... analysis (ESDA) toolbox, we finally pinpoint particular hot spots of the city’s residential property market associated with a significant spatial clustering of similar rental price values around individual observations....... proximity to the city centre compared to similar properties in Berlin’s periphery once we control for the properties’ physical characteristics. The observed temporal evolution of the rental price distribution between 2008 and 2013 thereby hints at an ongoing gentrification process in Germany’s capital...... associated with the current housing market boom. This visual impression is also confirmed by the application of quantile regressions for a correlation analysis between quality-adjusted rental price values and Berlin district-level characteristics obtained from the last census in 2011. Among other factors, we...

  3. Equipment line-up developed for structuring programmed digital systems important to safety

    International Nuclear Information System (INIS)

    Remus, L.; Colling, J.M.; Buisson, J.

    1986-01-01

    The use of the programmed digital techniques in systems important to safety led to developing equipment line-ups which allow to procedure, through using a restricted number of sub-assemblies, a variety of facilities capable of performing diversified functions. Upon remembering the requirements that such equipment are required to meet (quality assurance both at the design and production stages, qualification, testing opportunities, etc.) the equipments produced by MERLIN GERIN are described in this paper. Such equipments include a whole set of printed circuit boards, plug-in units with self-engaging connectors and the related cabinets to accomodate them. The following systems are made up of such equipments: Digital integrated protection system; Rod control and monitoring system; Reactor power distribution monitoring equipment. This equipment line-up has been gradually complemented and is still further expanding both as a result of the component further development or for the purpose of meeting new requirements or applications (new digital neutron instrumentation, local area networks). Experience gained thus far provides us with the capability of working out in a short time programmed systems for further applications in the nuclear power field

  4. 26 CFR 509.110 - Patent and copyright royalties and film rentals.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 19 2010-04-01 2010-04-01 false Patent and copyright royalties and film rentals... (CONTINUED) REGULATIONS UNDER TAX CONVENTIONS SWITZERLAND General Income Tax § 509.110 Patent and copyright... copyrights, artistic and scientific works, patents, designs, plans, secret processes and formulae, trademarks...

  5. The impact of 'studentification' on the rental housing market

    OpenAIRE

    Mira G. Baron; Sigal Kaplan

    2011-01-01

    Recent 'studentification' processes raise issues regarding the positive and negative impacts of student influx on the urban environment. The positive impacts discussed in the literature include urban core revitalization, employment generation and economic growth. The negative externalities comprise the formation of temporary sub-communities, competition with low-income groups in the rental housing market, and an increase in traffic volume. The current study adds to the literature by focusing ...

  6. Transfer of single farm payment entitlements to farm successors: impact on structural change and rental prices in Switzerland

    Directory of Open Access Journals (Sweden)

    Gabriele Mack

    2013-09-01

    Full Text Available This paper analyses the impact of tradable and non-tradable single farm payment (SFP entitlements for farm successors on structural change and the lease market. Using the example of Swiss agriculture, the effects on rental-price trends and farm-exit rates are investigated. An ex-ante normative impact analysis is performed with the agent-based agricultural-sector model SWISSland, which simulates structural change processes and income trends in Swiss agriculture over a period of up to 15 years. A land market implemented at municipality level simulates the plot-by-plot leasing of land to surrounding neighbouring agents that is common in Switzerland. Allocation of plots to tenants as well as lease pricing is modelled taking into account the farm-specific land rents. The results show that personalised SFP entitlements which could not be transferred to a farm successor not only cause an intensification of structural change, but would also thus lead to a substantial reduction in rental prices. SFP entitlements which were successfully transferred to farm successors have only a slight impact on structural change and the rental prices of arable land. Only for grassland in the mountain region does a stronger shift result in a significant reduction in rental prices.

  7. 45 CFR 1174.25 - Program income.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Program income. 1174.25 Section 1174.25 Public....25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or...

  8. 20 CFR 437.25 - Program income.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Program income. 437.25 Section 437.25....25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or...

  9. 45 CFR 1183.25 - Program income.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Program income. 1183.25 Section 1183.25 Public....25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or...

  10. 10 CFR 600.225 - Program income.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program income. 600.225 Section 600.225 Energy DEPARTMENT....225 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or...

  11. 23 CFR 1200.24 - Program income.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Program income. 1200.24 Section 1200.24 Highways... Implementation and Management of the Highway Safety Program § 1200.24 Program income. (a) Inclusions. Program income includes income from fees for services performed, from the use or rental of real or personal...

  12. 7 CFR 277.10 - Program income.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Program income. 277.10 Section 277.10 Agriculture... § 277.10 Program income. (a) Program income is gross income resulting from activities financed with program funds. Such earnings exclude interest income but include income from service fees, usage or rental...

  13. 26 CFR 513.4 - Patent and copyright royalties and film rentals.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 19 2010-04-01 2010-04-01 false Patent and copyright royalties and film rentals. 513.4 Section 513.4 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) REGULATIONS UNDER TAX CONVENTIONS IRELAND Withholding of Tax § 513.4 Patent and copyright royalties and film...

  14. US DOE Radiological Assistance Program: personnel, equipment and resources

    International Nuclear Information System (INIS)

    Hull, A.P.; Kuehner, A.V.; Phillips, L.F.

    1982-01-01

    The Radiological Assistance Program (RAP) of the US Department of Energy (DOE) is intended to provide emergency advice and assistance in the event of radiological incidents. Each of DOE's eight Regional Coordinating Offices in the US provide a 24-hour reporting and response capability. Specifically, the Brookhaven Area Office (BHO) is responsible for DOE's Region I, which includes the 11 northeastern states of the US. Although an inventory of dedicated equipment is assigned to BHO-RAP, it draws upon the resources of Brookhaven National Laboratory (BNL) for trained personnel in health physics and for other specialized personnel in both the day to day operation of the program and in the on-the-scene response to an incident. The organization of the BHO-RAP program and its response procedures are described in detail. An inventory and brief description of the contents of a variety of emergency equipment kits and of additional state-of-the-art instruments is included. The BHO-RAP guidelines and requirements for field operations are also indicated, as are other DOE resources upon which it can draw

  15. Commercial equipment loads: End-Use Load and Consumer Assessment Program (ELCAP)

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, R.G.; Williamson, M.A.; Richman, E.E.; Miller, N.E.

    1990-07-01

    The Office of Energy Resources of the Bonneville Power Administration is generally responsible for the agency's power and conservation resource planning. As associated responsibility which supports a variety of office functions is the analysis of historical trends in and determinants of energy consumption. The Office of Energy Resources' End-Use Research Section operates a comprehensive data collection program to provide pertinent information to support demand-side planning, load forecasting, and demand-side program development and delivery. Part of this on-going program is known as the End-Use Load and Consumer Assessment Program (ELCAP), an effort designed to collect electricity usage data through direct monitoring of end-use loads in buildings. This program is conducted for Bonneville by the Pacific Northwest Laboratory. This report provides detailed information on electricity consumption of miscellaneous equipment from the commercial portion of ELCAP. Miscellaneous equipment includes all commercial end-uses except heating, ventilating, air conditioning, and central lighting systems. Some examples of end-uses covered in this report are office equipment, computers, task lighting, refrigeration, and food preparation. Electricity consumption estimates, in kilowatt-hours per square food per year, are provided for each end-use by building type. The following types of buildings are covered: office, retail, restaurant, grocery, warehouse, school, university, and hotel/motel. 6 refs., 35 figs., 12 tabs.

  16. Evaluation of Boulder, CO, SmartRegs Ordinance and Better Buildings Program

    Energy Technology Data Exchange (ETDEWEB)

    Arena, L.; Vijayakumar, G.

    2012-04-01

    Under the SmartRegs ordinance in the city of Boulder, Colorado, all rental properties in the city must achieve an energy efficiency level comparable to a HERS Index of approximately 120 points or lower by the year 2019. The City of Boulder received a $12 million grant from the DOE's Better Buildings initiative to create and incentivize their EnergySmart Program. In this report, the Consortium for Advanced Residential Buildings (CARB) describes its work with the program, including energy audits of rental properties, developing training programs for insulators and inspectors, and conducting interviews with property owners.

  17. Evaluation of Boulder, CO,SmartRegs Ordinance and Better Buildings Program

    Energy Technology Data Exchange (ETDEWEB)

    Arena, L. [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States); Vijayakumar, G. [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2012-04-01

    Under the SmartRegs ordinance in the city of Boulder, Colorado, all rental properties in the city must achieve an energy efficiency level comparable to a HERS Index of approximately 120 points or lower by the year 2019. The City of Boulder received a $12 million grant from the DOE’s Better Buildings initiative to create and incentivize their EnergySmart Program. In this report, the Consortium for Advanced Residential Buildings (CARB) describes its work with the program, including energy audits of rental properties, developing training programs for insulators and inspectors, and conducting interviews with property owners.

  18. Apollo experience report: Development flight instrumentation. [telemetry equipment for space flight test program

    Science.gov (United States)

    Farmer, N. B.

    1974-01-01

    Development flight instrumentation was delivered for 25 Apollo vehicles as Government-furnished equipment. The problems and philosophies of an activity that was concerned with supplying telemetry equipment to a space-flight test program are discussed. Equipment delivery dates, system-design details, and flight-performance information for each mission also are included.

  19. 7 CFR 1486.403 - What expenditures may CCC reimburse under the program?

    Science.gov (United States)

    2010-01-01

    ... budget, excluding indirect costs. Market development cooperators, state regional trade groups, for-profit..., dinner, and refreshments when part of an approved overseas trade activity; miscellaneous courtesies such.... Equipment rentals must be returned by the Recipient to the supplier in accordance with the lease agreements...

  20. 28 CFR 66.25 - Program income.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Program income. 66.25 Section 66.25... Administration § 66.25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real...

  1. 21 CFR 1403.25 - Program income.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Program income. 1403.25 Section 1403.25 Food and....25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use of rental of real or...

  2. 14 CFR 1273.25 - Program income.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program income. 1273.25 Section 1273.25... Administration § 1273.25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real...

  3. 45 CFR 602.25 - Program income.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Program income. 602.25 Section 602.25 Public... Requirements § 602.25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real...

  4. 24 CFR 511.76 - Program income.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Program income. 511.76 Section 511... Program income. (a) General. Grantees and State recipients are neither encouraged to earn nor discouraged from earning program income in using rental rehabilitation grant amounts under this part. (b...

  5. A procurement decision model for a video rental store — A case study

    African Journals Online (AJOL)

    eral; hence the video rental store owner (the decision maker) is required to procure new ... process by presenting a point of departure from which procurement decisions may be made. .... M = number of titles available for purchase,. Qi.

  6. 34 CFR 365.16 - What requirements apply to refunds and rebates?

    Science.gov (United States)

    2010-07-01

    ... goods, products, equipment, rental property, real property, or services. (b) Premiums, bonuses, gifts, and any other payments related to the purchase of goods, products, equipment, rental property, real...

  7. 45 CFR 92.25 - Program income.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Program income. 92.25 Section 92.25 Public Welfare... Administration § 92.25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real...

  8. 15 CFR 24.25 - Program income.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Program income. 24.25 Section 24.25... Administration § 24.25 Program income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real...

  9. Carbon rentals and silvicultural subsidies for private forests as climate policy instruments

    International Nuclear Information System (INIS)

    Uusivuori, J.; Laturi, J.

    2007-01-01

    The impacts of potential climate policy instruments on the carbon production of privately owned and operated forests were investigated. A forest model with an endogenous growth description and age-class structure was used to describe both the output supply and input demand decisions of a private non-industrial landowner with optimized consumption flow, harvest timing, and an intertemporal allocation of forest investments. Two scenarios were examined, notably (1) a scenario in which the landowner was granted periodic carbon rental payments; and (2) a scenario in which the government subsidized the costs of silvicultural investments. The intended and unintended effects of the policies were examined. Models were used to demonstrate that the effectiveness of the instruments was significantly influenced by the age-class structure of forests when future carbon benefits were discounted. It was concluded that carbon rental payments were a more effective policy for older age-class structured forests. Silvicultural subsidies were more beneficial for forests with younger age-class structures. 21 refs., 6 figs

  10. Promoting high efficiency residential HVAC equipment: Lessons learned from leading utility programs

    Energy Technology Data Exchange (ETDEWEB)

    Neme, C.; Peters, J.; Rouleau, D.

    1998-07-01

    The Consortium for Energy Efficiency recently sponsored a study of leading electric utility efforts to promote high efficiency residential HVAC equipment. Given growing concerns from some utilities about the level of expenditures associated with rebate programs, special emphasis was placed on assessing the success of financing and other non-rebate options for promoting efficiency. Emphasis was also placed on review of efforts--rebate or otherwise--to push the market to very high levels of efficiency (i.e., SEER 13). This paper presents the results of the study. It includes discussion of key lessons from the utility programs analyzed. It also examines program participation rates and other potential indicators of market impacts. One notable conclusion is that several utility programs have pushed market shares for SEER 12 equipment to about 50% (the national average is less than 20%). At least one utility program has achieved a 50% market share for SEER 13 equipment (the national average is less than 3%). In general, financing does not appear to have as broad an appeal as consumer rebates. However, one unique utility program which combines the other of customer financing with modest incentives to contractors--in the form of frequent seller points that can be redeemed for advertising, technician training, travel and other merchandise--offers some promise that high participation rates can be achieved without customer rebates.

  11. 49 CFR 18.25 - Program income.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Program income. 18.25 Section 18.25 Transportation... income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or personal property...

  12. 22 CFR 135.25 - Program income.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Program income. 135.25 Section 135.25 Foreign... income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or personal property...

  13. 45 CFR 1157.25 - Program income.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Program income. 1157.25 Section 1157.25 Public... income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or personal property...

  14. Private rental housing in the Czech Republic: Growth and…?

    Czech Academy of Sciences Publication Activity Database

    Lux, Martin; Sunega, Petr

    2010-01-01

    Roč. 46, č. 3 (2010), s. 349-373 ISSN 0038-0288 R&D Projects: GA ČR GA403/09/1915 Institutional research plan: CEZ:AV0Z70280505 Keywords : housing system * private rental housing * transition economies Subject RIV: AO - Sociology, Demography Impact factor: 0.389, year: 2010 http://sreview.soc.cas.cz/uploads/ba80d7abadad0ceb12b28890619601c58eaf9a03_LuxSunegasoccas2010-3.pdf

  15. 34 CFR 80.25 - Program income.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Program income. 80.25 Section 80.25 Education Office of... income. (a) General. Grantees are encouraged to earn income to defray program costs. Program income includes income from fees for services performed, from the use or rental of real or personal property...

  16. Analysis of Financing Model of Public Rental Construction%公租房建设融资模式研究

    Institute of Scientific and Technical Information of China (English)

    吕明革

    2014-01-01

    The construction of public rental needs much money and usually takes a long time , thus it can not only rely on limited financial investment , so financing becomes a bottleneck restricting the construction of public rental .At present, bank loans and project financing are two main financing models of the public rental , while PPP, REITs and other ways are rarely used .This paper introduces the traditional financing methods , focusing on the PPP and REITs . The paper summarizes the pros and cons of nine financing models and concludes that bank loans , project financing , BT, BOT, PPP, TOT, bonds, public rental REITs and ABS can pave the way for opening up social capital into the field of investment and construction of public rental channel .It is suggested that China raise housing finance though multiple channels , and seek to comply with China's specific situation of public rental financing model .%公租房建设资金需求量大、占用时间长,依靠有限的财政投入难以满足,因此,公租房融资成为制约公租房建设的瓶颈。目前,公租房融资主要使用银行贷款、项目融资等方式,而其他市场化融资方式使用较少。为拓宽公租房融资渠道,应积极引入并大力发展REITs、PPP等模式。其中,REITs模式的市场化程度较高,专业性更强,要求有完善的法律体系作保障;而PPP模式强调在政府引导下引入私人资本,以分担风险和成本。总体来说,REITs、PPP都将是中国公租房融资有益尝试。

  17. Are your employees protected from blood-borne pathogens? OSHA standards charge textile rental companies with responsibility for worker safety.

    Science.gov (United States)

    Weller, S C

    1991-11-01

    Congress is putting pressure on OSHA to finalize its Universal Precaution standards by December. When the standards go into effect, textile rental companies that serve medical, dental, and outpatient care facilities--including private physician and dentist offices--must take steps to protect employees from blood-borne pathogens. Soiled linens, towels, gowns, and other items from any customer in risk categories link a textile rental facility and/or commercial laundry with the OSHA regulations. Read and heed this information.

  18. 76 FR 22409 - Notice of Submission of Proposed Information Collection to OMB 2012 Rental Housing Finance Survey...

    Science.gov (United States)

    2011-04-21

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. Estimates derived from the RHFS sample will help public and private stakeholders better understand the financing, operating costs, and property characteristics of the multifamily rental housing stock in the United States. Many of the questions are similar to those found on the 1995 Property Owners and Managers Survey and the rental housing portion of the 2001 Residential Finance Survey.

  19. Migration and Land Rental as Risk Response in Rural China

    OpenAIRE

    Ward, Patrick S.; Shively, Gerald E.

    2011-01-01

    Households in developing countries take various actions to smooth income or consumption as a means of managing or responding to risk. One of the principal means of smoothing income is through the diversification of income sources, including non-farm employment and rural-urban migration. An important consumption smoothing strategy involves the accumulation and depletion of assets. We examine migration and land rental market participation as responses to risk in rural China. Using a longitudina...

  20. Expansion of the acceptance program: nitrous oxide scavenging equipment and nitrous oxide trace gas monitoring equipment

    Energy Technology Data Exchange (ETDEWEB)

    1977-10-01

    The Acceptance Program for dental materials and devices and the general guidelines for submission of products have been reported in the Journal (88:615 March 1974). At its April 1977 meeting, the Council included equipment for scavenging and monitoring trace nitrous oxide gas in its Acceptance Program. The Council has established the effective date for classification of products under these two sets of guidelines as one year from the date of publication of this announcement. After that date, classification of a product will be required before promotion or exhibition in Association media.

  1. Differentiation of car rental services in the Croatian market

    Directory of Open Access Journals (Sweden)

    Karolina Karlo Marijanović

    2010-06-01

    Full Text Available A number of service companies focus on service differentiation nowadays. The companies that manage to deliver superior service are winners and may serve as an example of how the growth of services has changed business. The first part of the paper presents an analysis of the Croatian car rental services market. The theoretical part of the paper provides an insight into the characteristics of services in general, followed by an overview of the characteristics and features of the companies operating in the local market. The second part of the paper deals with the work of Porter and his three generic strategies, and with his differentiation strategy in particular. Subsequently, all possibilities of differentiation strategies that are appropriate to the car rental services are analyzed. Beside global recession, the Croatian market is currently also struggling with huge competition and companies cannot generate profit without continuous differentiation of all elements of service. In the third chapter the following hypothesis is set: By a continuous differentiation of all elements of the services marketing mix small businesses can compete with large international companies. Acceptance or rejection of the hypothesis is shown by the research conducted among users of the specific service. Its results fully confirm the set hypothesis. The fact that, despite global recession, the majority of respondents believes the survival of small- and medium-sized companies which continuously differentiate their business activities to be unquestionable is indeed encouraging.

  2. 49 CFR 23.49 - What is the base for a recipient's goal for car rentals?

    Science.gov (United States)

    2010-10-01

    ... DISADVANTAGED BUSINESS ENTERPRISE IN AIRPORT CONCESSIONS Goals, Good Faith Efforts, and Counting § 23.49 What is the base for a recipient's goal for car rentals? Except in the case where you use the alternative goal...

  3. From Harassment to Helping with Antisocial Youth: The EQUIP Program.

    Science.gov (United States)

    Gibbs, John C.; Potter, Granville Bud; Goldstein, Arnold P.; Brendtro, Larry K.

    1996-01-01

    Describes a new psychoeducational treatment model for antisocial youth. Discusses the principles and methods for cultivating a positive caring culture in the schools and how the program equips youth for effective peer helping by integrating positive peer culture with training in moral development, anger management, social skills, and correcting…

  4. FAKTOR YANG BERHUBUNGAN DENGAN KELUHAN COMPUTER VISION SYNDROME (CVS PADA PEKERJA RENTAL KOMPUTER DI WILAYAH UNNES

    Directory of Open Access Journals (Sweden)

    Melati Aisyah Permana

    2015-07-01

    Full Text Available Computer as a tool that is widely used human beings, it also raises occupational diseases as well as the use of machine in industry. Vision problems caused bye the use of computers, the American Optometric Association (AOA called Computer Vision Syndrome (CVS as a compound eye problems related to employment experienced by a person at close range as or related to computer use. The purpose of this study was to analyze the relationship between the working length, the distance eye with the monitor, lighting intensity, work attitude, and identifity the incidence of complaints of CVS workers experienced computer rentals. This study used Cross Sectional approach. Number of population and sample of 36 peoples working computer rental in the area Unnes campus. The instruments used in the form of quetionnatires, meter, and Lux meter. Chi square test result : (1the working length (p=0,005; (2 the distance eye with the monitor (p=0,012; (3 lighting intensity (p=0,001; (4 work attitude (p=0,014 with complaints of CVS in workers computer rental at the campus Unnes. Suggestion for worker is to check their eyes regulary to the doctor if the complaints of CVS in order to minimize the occurrence of more severe diseases. While other researchers needed for further studies with different variables to better determine other factors associated with symptoms of Computer Vision Syndrome (CVS.

  5. Evaluation of asset replacement strategies considering economic cycles: lessons from the machinery rental business

    NARCIS (Netherlands)

    Grössler, A.; Bivona, E.; Fuzhuang, L.; Größler, A.

    2015-01-01

    In businesses with heavy capital investments, the effective management of assets is crucial, in particular in the fleet rental business where assets are the major source of revenues. One important question in this regard concerns the replacement of used assets and the purchase of new assets. Thus,

  6. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  7. Property Restitution and Private Rental Housing in Transition: The Case of the Czech Republic

    Czech Academy of Sciences Publication Activity Database

    Lux, Martin; Mikeszová, Martina

    2012-01-01

    Roč. 27, č. 1 (2012), s. 77-96 ISSN 0267-3037 R&D Projects: GA ČR GA403/09/1915 Institutional research plan: CEZ:AV0Z70280505 Keywords : transition * property restitution * private rental housing Subject RIV: AO - Sociology, Demography Impact factor: 0.951, year: 2012

  8. A tale of three cities: Insight into the impacts of holiday rentals in ...

    African Journals Online (AJOL)

    In Paris, the rented accommodation spend by tourists is estimated to be as much as €217 140 000. Côte d'Azur in rented properties generates an average accommodation expenditure of €105 840 000, and in Haute-Savoie generated a direct accommodation spend of €29 148 000. Keywords: vacation rentals, Paris, Côte ...

  9. The IHS diagnostic X-ray equipment radiation protection program

    International Nuclear Information System (INIS)

    Knapp, A.; Byrns, G.; Suleiman, O.

    1994-01-01

    The Indian Health Service (IHS) operates or contracts with Tribal groups to operate 50 hospitals and approximately 165 primary ambulatory care centers. These facilities contain approximately 275 medical and 800 dental diagnostic x-ray machines. IHS environmental health personnel in collaboration with the Food and Drug Administration's (FDA) Center for Devices and Radiological Health (CDRH) developed a diagnostic x-ray protection program including standard survey procedures and menu-driven calculations software. Important features of the program include the evaluation of equipment performance collection of average patient entrance skin exposure (ESE) measurements for selected procedures, and quality assurance. The ESE data, collected using the National Evaluation of X-ray Trends (NEXT) protocol, will be presented. The IHS Diagnostic X-ray Radiation Protection Program is dynamic and is adapting to changes in technology and workload

  10. Ethnic and gender discrimination in the private rental housing market in Finland: A field experiment.

    Directory of Open Access Journals (Sweden)

    Annamaria Öblom

    Full Text Available Ethnic and gender discrimination in a variety of markets has been documented in several populations. We conducted an online field experiment to examine ethnic and gender discrimination in the private rental housing market in Finland. We sent 1459 inquiries regarding 800 apartments. We compared responses to standardized apartment inquiries including fictive Arabic-sounding, Finnish-sounding or Swedish-sounding female or male names. We found evidence of discrimination against Arabic-sounding names and male names. Inquiries including Arabic-sounding male names had the lowest probability of receiving a response, receiving a response to about 16% of the inquiries made, while Finnish-sounding female names received a response to 42% of the inquires. We did not find any evidence of the landlord's gender being associated with the discrimination pattern. The findings suggest that both ethnic and gender discrimination occur in the private rental housing market in Finland.

  11. Ethnic and gender discrimination in the private rental housing market in Finland: A field experiment.

    Science.gov (United States)

    Öblom, Annamaria; Antfolk, Jan

    2017-01-01

    Ethnic and gender discrimination in a variety of markets has been documented in several populations. We conducted an online field experiment to examine ethnic and gender discrimination in the private rental housing market in Finland. We sent 1459 inquiries regarding 800 apartments. We compared responses to standardized apartment inquiries including fictive Arabic-sounding, Finnish-sounding or Swedish-sounding female or male names. We found evidence of discrimination against Arabic-sounding names and male names. Inquiries including Arabic-sounding male names had the lowest probability of receiving a response, receiving a response to about 16% of the inquiries made, while Finnish-sounding female names received a response to 42% of the inquires. We did not find any evidence of the landlord's gender being associated with the discrimination pattern. The findings suggest that both ethnic and gender discrimination occur in the private rental housing market in Finland.

  12. Recovery Act: Training Program Development for Commercial Building Equipment Technicians

    Energy Technology Data Exchange (ETDEWEB)

    Leah Glameyer

    2012-07-12

    The overall goal of this project has been to develop curricula, certification requirements, and accreditation standards for training on energy efficient practices and technologies for commercial building technicians. These training products will advance industry expertise towards net-zero energy commercial building goals and will result in a substantial reduction in energy use. The ultimate objective is to develop a workforce that can bring existing commercial buildings up to their energy performance potential and ensure that new commercial buildings do not fall below their expected optimal level of performance. Commercial building equipment technicians participating in this training program will learn how to best operate commercial buildings to ensure they reach their expected energy performance level. The training is a combination of classroom, online and on-site lessons. The Texas Engineering Extension Service (TEEX) developed curricula using subject matter and adult learning experts to ensure the training meets certification requirements and accreditation standards for training these technicians. The training targets a specific climate zone to meets the needs, specialized expertise, and perspectives of the commercial building equipment technicians in that zone. The combination of efficient operations and advanced design will improve the internal built environment of a commercial building by increasing comfort and safety, while reducing energy use and environmental impact. Properly trained technicians will ensure equipment operates at design specifications. A second impact is a more highly trained workforce that is better equipped to obtain employment. Organizations that contributed to the development of the training program include TEEX and the Texas Engineering Experiment Station (TEES) (both members of The Texas A&M University System). TEES is also a member of the Building Commissioning Association. This report includes a description of the project

  13. 47 CFR 76.901 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... service area of such station, regardless of how such signal is ultimately received by the cable system) any public, educational, and governmental programming required by the franchise to be carried on the... over a cable system, regardless of service tier, including installation or rental of equipment used for...

  14. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  15. 24 CFR 511.75 - Disbursement of rental rehabilitation grant amounts: Cash and Management Information System.

    Science.gov (United States)

    2010-04-01

    ... rehabilitation grant amounts: Cash and Management Information System. 511.75 Section 511.75 Housing and Urban... rehabilitation grant amounts: Cash and Management Information System. (a) General. Rental Rehabilitation grants.... Any drawdown is conditioned upon the submission of satisfactory information by the grantee or State...

  16. The impact of Energy Performance Certificates on the rental and capital values of commercial property assets

    Energy Technology Data Exchange (ETDEWEB)

    Fuerst, Franz, E-mail: ff274@cam.ac.uk [Department of Land Economy, University of Cambridge, 19 Silver Street, Cambridge, CB3 9EP (United Kingdom); McAllister, Patrick [Real Estate and Planning, Henley Business School, University of Reading, RG6 5UD (United Kingdom)

    2011-10-15

    This paper focuses on the effect of energy performance ratings on appraised capital values, rental values and equivalent yields of UK commercial property assets. The study is based on a cross-section of 708 commercial property assets. Incorporating a range of potential confounding factors such as unexpired lease term, vacancy rate and tenant credit risk, we use hedonic regression procedures to estimate the effect of EPC rating on rental and capital values. The study finds no evidence of a significant relationship between environmental and/or energy performance and rental and capital values. A small subset of 24 BREEAM-rated assets is also tested for significant price effects but a statistically significant effect is only confirmed for equivalent yields. Similarly, there was no evidence that the EPC rating had any effect on Market Rent or Market Value with only minor effects of EPC ratings on equivalent yields. The preliminary conclusion is that energy labelling is not yet having the effects on Market Values and Market Rents that would be expected if high EPC ratings were associated with substantial cost savings that are fully reflected in capital values and/or were readily available and taken into account by prospective tenants and buyers. - Highlights: > Finds no significant effect of EPC ratings on commercial real estate values. > Expected relationships with other price determinants, e.g. age, location confirmed. > Analysis provides some support for effect of EPC and BREEAM rating on yields.

  17. The impact of Energy Performance Certificates on the rental and capital values of commercial property assets

    International Nuclear Information System (INIS)

    Fuerst, Franz; McAllister, Patrick

    2011-01-01

    This paper focuses on the effect of energy performance ratings on appraised capital values, rental values and equivalent yields of UK commercial property assets. The study is based on a cross-section of 708 commercial property assets. Incorporating a range of potential confounding factors such as unexpired lease term, vacancy rate and tenant credit risk, we use hedonic regression procedures to estimate the effect of EPC rating on rental and capital values. The study finds no evidence of a significant relationship between environmental and/or energy performance and rental and capital values. A small subset of 24 BREEAM-rated assets is also tested for significant price effects but a statistically significant effect is only confirmed for equivalent yields. Similarly, there was no evidence that the EPC rating had any effect on Market Rent or Market Value with only minor effects of EPC ratings on equivalent yields. The preliminary conclusion is that energy labelling is not yet having the effects on Market Values and Market Rents that would be expected if high EPC ratings were associated with substantial cost savings that are fully reflected in capital values and/or were readily available and taken into account by prospective tenants and buyers. - Highlights: → Finds no significant effect of EPC ratings on commercial real estate values. → Expected relationships with other price determinants, e.g. age, location confirmed. → Analysis provides some support for effect of EPC and BREEAM rating on yields.

  18. Sensor equipment of the German earth scientific airplane program

    Science.gov (United States)

    Seige, P.

    1975-01-01

    The German airplane program for earth scientific research supports the work of a vast staff of earth scientists from universities and federal agencies. Due to their fields of interest, which are in oceanography, hydrology, geology, ecology, and forestry, five test areas were selected which are spread all over Germany. The sensor package, which was designed in accordance with the requirements of this group of scientists, will be installed in a DO 28 D2 type airplane. The sensor equipment consists of a series of 70-mm cameras having different film/filter combinations, a photogrammetric camera, an infrared radiometer, an 11-channel multispectral line scanner, a LANDSAT-compatible radiometer, and a complex avionic system. Along with the airplane, a truck will be equipped with a set of radiometers and other sensor devices for extensive ground-truth measurement; this also includes a cherry picker.

  19. Program plan for environmental qualification of mechanical and dynamic (including seismic) qualification of mechanical and electrical equipment program (EDQP)

    International Nuclear Information System (INIS)

    Weidenhamer, G.H.

    1986-06-01

    The equipment qualification program described in this plan is intended to provide the technical basis for resolving uncertainties in existing equipment qualification standards. In addition, research results are contributing to the resolution of safety issues GI-23, GI-87, USI-A44, titled, ''Reactor Coolant Pump Seal Failure,'' ''Failure of HPCI Steam Line Without Isolation,'' and ''Station Blackout,'' respectively. Also, research effort is being directed at providing information on the behavior of containment isolation valves under severe accident environments. Although the results of the latter research will not contribute to resolving uncertainties in qualification standards, it has proven cost effective to obtain this information under this program

  20. Measuring the Effect of Housing Quality Interventions: The Case of the New Zealand "Rental Warrant of Fitness".

    Science.gov (United States)

    Telfar-Barnard, Lucy; Bennett, Julie; Howden-Chapman, Philippa; Jacobs, David E; Ormandy, David; Cutler-Welsh, Matthew; Preval, Nicholas; Baker, Michael G; Keall, Michael

    2017-11-07

    In New Zealand, as in many other countries, housing in the private-rental sector is in worse condition than in the owner-occupier housing sector. New Zealand residential buildings have no inspection regime after original construction signoff. Laws and regulations mandating standards for existing residential housing are outdated and spread over a range of instruments. Policies to improve standards in existing housing have been notoriously difficult to implement. In this methods paper, we describe the development and implementation of a rental Warrant of Fitness (WoF) intended to address these problems. Dwellings must pass each of 29 criteria for habitability, insulation, heating, ventilation, safety, amenities, and basic structural soundness to reach the WoF minimum standard. The WoF's development was based on two decades of research on the impact of housing quality on health and wellbeing, and strongly influenced by the UK Housing Health and Safety Rating System and US federal government housing standards. Criteria were field-tested across a range of dwelling types and sizes, cities, and climate zones. The implementation stage of our WoF research consists of a non-random controlled quasi-experimental study in which we work with two city-level local government councils to implement the rental WoF, recruiting adjoining council areas as controls, and measuring changes in health, economic, and social outcomes.

  1. Analisa Strategi E-Marketing dan Implementasinya pada Rental Company

    Directory of Open Access Journals (Sweden)

    Meyliana Meyliana

    2011-05-01

    Full Text Available Customers are the main key for persistence of a company. The company could arrange old customers and attract new customers, as marketing event. Marketing is one component in customer relationship management. Marketing today has become a trend in doing promotion, increase new customers to expand target market, and maintain old customer loyalty to increase the company sales’ point volume. Supported by appropriate information technology, marketing event could be changed as events that give benefit to the company. Marketing event with information technology, e-marketing, is done to increase company image. After being analysed, this e-marketing strategy will be implemented to rental company. 

  2. Analysis of Refrigeration Equipment in School Nutrition Programs in the USDA/FNS Southwest Region

    Science.gov (United States)

    Webb, Virginia Susan

    2012-01-01

    Equipment to store foods at proper temperatures is critical to serving safe and nutritious meals in schools yet little is known about the amount or the adequacy of refrigerated storage in school nutrition programs. The purposes of this study were to identify the types and capacity of refrigeration equipment used in schools, determine the perceived…

  3. 77 FR 64822 - Notice of Submission of Proposed Information Collection to OMB; Rental Assistance Demonstration...

    Science.gov (United States)

    2012-10-23

    ... contracts; and Rent Supplement (Rent Supp), Rental Assistance Payment (RAP), and Mod Rehab properties, upon contract expiration or termination, to convert tenant protection vouchers (TPVs) to project-based vouchers... rights and duties of the applicant and HUD, with respect to the converted project and any payments under...

  4. Measuring the Effect of Housing Quality Interventions: The Case of the New Zealand “Rental Warrant of Fitness”

    Science.gov (United States)

    Telfar-Barnard, Lucy; Bennett, Julie; Howden-Chapman, Philippa; Jacobs, David E.; Ormandy, David; Cutler-Welsh, Matthew; Preval, Nicholas; Baker, Michael G.; Keall, Michael

    2017-01-01

    In New Zealand, as in many other countries, housing in the private-rental sector is in worse condition than in the owner-occupier housing sector. New Zealand residential buildings have no inspection regime after original construction signoff. Laws and regulations mandating standards for existing residential housing are outdated and spread over a range of instruments. Policies to improve standards in existing housing have been notoriously difficult to implement. In this methods paper, we describe the development and implementation of a rental Warrant of Fitness (WoF) intended to address these problems. Dwellings must pass each of 29 criteria for habitability, insulation, heating, ventilation, safety, amenities, and basic structural soundness to reach the WoF minimum standard. The WoF’s development was based on two decades of research on the impact of housing quality on health and wellbeing, and strongly influenced by the UK Housing Health and Safety Rating System and US federal government housing standards. Criteria were field-tested across a range of dwelling types and sizes, cities, and climate zones. The implementation stage of our WoF research consists of a non-random controlled quasi-experimental study in which we work with two city-level local government councils to implement the rental WoF, recruiting adjoining council areas as controls, and measuring changes in health, economic, and social outcomes. PMID:29112147

  5. Measuring the Effect of Housing Quality Interventions: The Case of the New Zealand “Rental Warrant of Fitness”

    Directory of Open Access Journals (Sweden)

    Lucy Telfar-Barnard

    2017-11-01

    Full Text Available In New Zealand, as in many other countries, housing in the private-rental sector is in worse condition than in the owner-occupier housing sector. New Zealand residential buildings have no inspection regime after original construction signoff. Laws and regulations mandating standards for existing residential housing are outdated and spread over a range of instruments. Policies to improve standards in existing housing have been notoriously difficult to implement. In this methods paper, we describe the development and implementation of a rental Warrant of Fitness (WoF intended to address these problems. Dwellings must pass each of 29 criteria for habitability, insulation, heating, ventilation, safety, amenities, and basic structural soundness to reach the WoF minimum standard. The WoF’s development was based on two decades of research on the impact of housing quality on health and wellbeing, and strongly influenced by the UK Housing Health and Safety Rating System and US federal government housing standards. Criteria were field-tested across a range of dwelling types and sizes, cities, and climate zones. The implementation stage of our WoF research consists of a non-random controlled quasi-experimental study in which we work with two city-level local government councils to implement the rental WoF, recruiting adjoining council areas as controls, and measuring changes in health, economic, and social outcomes.

  6. 78 FR 31451 - Pet Ownership for the Elderly or Persons With Disabilities in Multifamily Rental Housing...

    Science.gov (United States)

    2013-05-24

    ... Pet Ownership for the Elderly or Persons With Disabilities in Multifamily Rental Housing; Accumulation of Deposits for Costs Attributable to Pets AGENCY: Office of the Secretary, HUD. ACTION: Proposed... disabilities allow for the residents of such housing to own common household pets, subject to the residents...

  7. The Spillover Effect of a Flood on Pets and Their People: Implications for Rental Housing.

    Science.gov (United States)

    Graham, Taryn M; Rock, Melanie J

    2018-06-04

    When disasters strike, companion animals (pets) matter. Emergency planning for them is a key aspect of disaster preparedness, especially considering that people may delay evacuation out of concern for their pets. Temporary boarding options for pets are important; however, caregivers (owners) must ultimately return to permanent housing. Surprisingly little attention has been paid to housing recovery in the disaster literature on pet ownership, and no studies have examined the potential for increased vulnerability among tenants with pets. This study analyzed online rental listings in a city that was severely flooded in 2013. In the following year, demand for pet-friendly rental housing outweighed supply. Landlords frequently stipulated restrictions on the allowable sizes, species, or breeds of pets. Dogs were often banned outright. To keep their pets, prospective tenants needed to exercise flexibility in location and pay higher surcharges. The implications of housing insecurity for tenants with pets have broad relevance, not just in disaster circumstances. Giving up a companion animal to secure housing can negatively impact resilience, whereas living in unsafe environments to avoid pet relinquishment may increase vulnerability.

  8. A Global Review of Incentive Programs to Accelerate Energy-Efficient Appliances and Equipment

    Energy Technology Data Exchange (ETDEWEB)

    de la Rue du Can, Stephane; Phadke, Amol; Leventis, Greg; Gopal, Anand

    2013-08-01

    Incentive programs are an essential policy tool to move the market toward energy-efficient products. They offer a favorable complement to mandatory standards and labeling policies by accelerating the market penetration of energy-efficient products above equipment standard requirements and by preparing the market for increased future mandatory requirements. They sway purchase decisions and in some cases production decisions and retail stocking decisions toward energy-efficient products. Incentive programs are structured according to their regulatory environment, the way they are financed, by how the incentive is targeted, and by who administers them. This report categorizes the main elements of incentive programs, using case studies from the Major Economies Forum to illustrate their characteristics. To inform future policy and program design, it seeks to recognize design advantages and disadvantages through a qualitative overview of the variety of programs in use around the globe. Examples range from rebate programs administered by utilities under an Energy-Efficiency Resource Standards (EERS) regulatory framework (California, USA) to the distribution of Eco-Points that reward customers for buying efficient appliances under a government recovery program (Japan). We found that evaluations have demonstrated that financial incentives programs have greater impact when they target highly efficient technologies that have a small market share. We also found that the benefits and drawbacks of different program design aspects depend on the market barriers addressed, the target equipment, and the local market context and that no program design surpasses the others. The key to successful program design and implementation is a thorough understanding of the market and effective identification of the most important local factors hindering the penetration of energy-efficient technologies.

  9. Rental fees for using the non-residential funds of the municipal fisc and factors of its growth

    Directory of Open Access Journals (Sweden)

    Raul’ R. Yarullin

    2015-12-01

    Full Text Available Objective to develop the theoretical bases of forming the rent fees for nonresidential funds which constitute the fisc of Ufa municipality and to identify the opportunities of revenues increase from its use. Methods abstractlogical dialectical comparative systematic and structural economic analysis and synthesis. Results the content is disclosed of the rental fees of nonresidential funds constituting the municipal fisc as a cash payment of compensatory and equivalent character for the use of the municipality fisc the necessity is grounded of increasing the budget effectiveness of the municipal nonresidential facilities rent which consists in the proper use of rental fees for maintenance investments in the renovation and construction of nonresidential facilities the availability of funds for their financing and the lack of growth in rents above the economically viable threshold the factors are analyzed which determine the budget revenues from rent affecting the fiscal efficiency of nonresidential facilities rent in Ufa city a number of problematic issues were identified of systemic character reduction of the number of rent contracts reduction of the rented space an excessive amount of the reduced rent arrears of tenants on rents insufficient quality of the information management system ways are propose to improve the budget efficiency and profitability of the nonresidential rent consisting in the transition of nonresidential buildings and premises which are in economic conducting or in operational administration or are unused unregistered into the rent regime with the establishment of feasible rental fees expanding the number of premises the rental fee for the use of which is determined by bidding reduction of benefits to commercial organizations for the rent payment providing full and timely transfer of the arrears from tenants to the budget acceleration of the formation of the automated system for mass valuation of real estate allowing to

  10. The Effect of Biogas Production on Farmland Rental Prices: Empirical Evidences from Northern Italy

    Directory of Open Access Journals (Sweden)

    Eugenio Demartini

    2016-11-01

    Full Text Available In the last decade, increased environmental awareness has prompted the adoption of incentives for exploiting renewable energy sources. Among these, biogas production has received a certain attention in developed countries. Nonetheless, the subsidies provided have posed the problem of an activity (the production of bioenergy that engages in direct competition with food and feed production for limited resources, like agricultural land. Even if this competition may be softened by allocating marginal land and/or using dedicated non-agricultural crops, empirical evidence shows that biogas plants have been developed in highly-productive agricultural areas, using increasing amounts of maize silage as feedstock. Thus, studies aimed at measuring the effect of biogas production on agricultural activities are needed in order to avoid this socially undesirable outcome. The paper presents an econometric estimation of the impact of biogas plants on farmland rental values of a Northern Italian rural area. Results show that biogas has a non-linear effect on rental prices, suggesting that incentive schemes specifically accounting for plants’ dimensions and technologies would improve the social sustainability of the bioenergy sector and its coexistence with agricultural activity.

  11. Kennedy Space Center: Constellation Program Electrical Ground Support Equipment Research and Development

    Science.gov (United States)

    McCoy, Keegan

    2010-01-01

    The Kennedy Space Center (KSC) is NASA's spaceport, launching rockets into space and leading important human spaceflight research. This spring semester, I worked at KSC on Constellation Program electrical ground support equipment through NASA's Undergraduate Student Research Program (USRP). This report includes a discussion of NASA, KSC, and my individual research project. An analysis of Penn State's preparation of me for an internship and my overall impressions of the Penn State and NASA internship experience conclude the report.

  12. 75 FR 17942 - Notice of Proposed Information Collection for Public Comment on the Quality Control for Rental...

    Science.gov (United States)

    2010-04-08

    ... Information Collection for Public Comment on the Quality Control for Rental Assistance Subsidy Determinations... respondent burden (e.g., permitting electronic submission of responses). Title of Proposal: Quality Control... covered by the Public Housing and Section 8 housing subsidies. The Quality Control process involves...

  13. Cost-analysis of an oral health outreach program for preschool children in a low socioeconomic multicultural area in Sweden

    DEFF Research Database (Denmark)

    Wennhall, Inger; Norlund, Anders; Matsson, Lars

    2010-01-01

    to a comprehensive oral health outreach project for preschool children conducted in a low-socioeconomic multi-cultural urban area. The outcome was compared with historical controls from the same area with conventional dental care. The cost per minute for the various dental professions was added to the cost......The aim was to calculate the total and the net costs per child included in a 3-year caries preventive program for preschool children and to make estimates of expected lowest and highest costs in a sensitivity analysis. The direct costs for prevention and dental care were applied retrospectively...... of materials, rental facilities and equipment based on accounting data. The cost for fillings was extracted from a specified per diem list. Overhead costs were assumed to correspond to 50% of salaries and all costs were calculated as net present value per participating child in the program and expressed...

  14. MGR COMPLIANCE PROGRAM GUIDANCE PACKAGE FOR RADIATION PROTECTION EQUIPMENT, INSTRUMENTATION, AND FACILITIES

    International Nuclear Information System (INIS)

    2000-01-01

    This Compliance Program Guidance Package identifies the regulatory guidance and industry codes and standards addressing radiation protection equipment, instrumentation, and support facilities considered to be appropriate for radiation protection at the Monitored Geologic Repository (MGR). Included are considerations relevant to radiation monitoring instruments, calibration, contamination control and decontamination, respiratory protection equipment, and general radiation protection facilities. The scope of this Guidance Package does not include design guidance relevant to criticality monitoring, area radiation monitoring, effluent monitoring, and airborne radioactivity monitoring systems since they are considered to be the topics of specific design and construction requirements (i.e., ''fixed'' or ''built-in'' systems). This Guidance Package does not address radiation protection design issues; it addresses the selection and calibration of radiation monitoring instrumentation to the extent that the guidance is relevant to the operational radiation protection program. Radon and radon progeny monitoring instrumentation is not included in the Guidance Package since such naturally occurring radioactive materials do not fall within the NRC's jurisdiction at the MGR

  15. Plant experience with temporary reverse osmosis makeup water systems

    International Nuclear Information System (INIS)

    Polidoroff, C.

    1986-01-01

    Pacific Gas and Electric (PG and E) Company's Diablo Canyon Power Plant (DCPP), which is located on California's central coast, has access to three sources of raw water: creek water, well water, and seawater. Creek and well water are DCPP's primary sources of raw water; however, because their supply is limited, these sources are supplemented with seawater. The purpose of this paper is to discuss the temporary, rental, reverse osmosis systems used by PG and E to process DCPP's raw water into water suitable for plant makeup. This paper addresses the following issues: the selection of reverse osmosis over alternative water processing technologies; the decision to use vendor-operated temporary, rental, reverse osmosis equipment versus permanent PG and E-owned and -operated equipment; the performance of DCPP's rental reverse osmosis systems; and, the lessons learned from DCPP's reverse osmosis system rental experience that might be useful to other plants considering renting similar equipment

  16. Pill counts and pill rental: unintended entrepreneurial opportunities.

    Science.gov (United States)

    Viscomi, Christopher M; Covington, Melissa; Christenson, Catherine

    2013-07-01

    Prescription opioid diversion and abuse are becoming increasingly prevalent in many regions of the world, particularly the United States. One method advocated to assess compliance with opioid prescriptions is occasional "pill counts." Shortly before a scheduled appointment, a patient is notified that they must bring in the unused portion of their opioid prescription. It has been assumed that if a patient has the correct number and strength of pills that should be present for that point in a prescription interval that they are unlikely to be selling or abusing their opioids. Two cases are presented where patients describe short term rental of opioids from illicit opioid dealers in order to circumvent pill counts. Pill renting appears to be an established method of circumventing pill counts. Pill counts do not assure non-diversion of opioids and provide additional cash flow to illicit opioid dealers.

  17. 76 FR 38198 - Notice of Submission of Proposed Information Collection to OMB Housing Counseling Program...

    Science.gov (United States)

    2011-06-29

    ... Proposed Information Collection to OMB Housing Counseling Program- Application for Approval as a Housing... private nonprofit agencies that provide housing counseling services directly or through their affiliates or branches regarding home buying, homeownership and rental housing programs submit an application...

  18. 78 FR 40158 - Supportive Housing for the Elderly Senior Preservation Rental Assistance Contracts: 60-Day Notice...

    Science.gov (United States)

    2013-07-03

    ... project that have been audited by an Independent Public Accountant in the form required by HUD. All four...: Notice of request for public comment. SUMMARY: In accordance with the Paperwork Reduction Act of 1995, HUD is issuing for public comment four documents for use in the Senior Preservation Rental Assistance...

  19. THE PROGRAM-TARGET PLANNING AND MANAGEMENT OF DEVELOPMENT OF MEASURING EQUIPMENT PARK

    Directory of Open Access Journals (Sweden)

    Marichev Pavel Aleksandrovich

    2018-02-01

    Full Text Available Subject: study of the Park of Measuring Equipment (PME that includes hundreds of thousands of standard samples, measuring instruments, control and measuring devices and other measuring mechanisms with different areas of application, levels of reliability, service life, levels of technical perfection and levels of technical condition. Research objectives: 1. Development of a complex of mathematical models to simulate the processes of development of PME, control indicators of PME performance as a whole, purposefully control the stages of life cycle of measuring equipment samples. 2. Development of the method which, with a sufficient degree of validity and objectivity, would solve the tasks of management of procurement and repairs both in preparation of proposals for preliminary long-term plan documents (LTPD and to ensure control over the implementation of adopted plans. Thus, the method being developed should be fairly simple to use, easily adjustable for solving problems of different dimensions, suitable for solving the optimal control problem for PME as a whole, for a part of PME, and also suitable for solving a generalized problem for certain “aggregated objects” such as the Metrology Centers. Materials and methods: the methods of mathematical simulation, methods of comparative analysis, simplex method for solving linear programming problem, methods of program-target planning were used. Results: an approach to the solution of problems of program-target planning based on solving a series of linear programming problems has been developed. The results have been presented of using the approach both for formulation of proposals into the preliminary LTPD and also for introducing revisions (amendments to annual plans, which are implemented in the framework of the state defense order. Conclusions: the described method and algorithms constitute an effective tool for solving practical problems of target-oriented management of PME performance

  20. Searching for Housing as a Battered Woman: Does Discrimination Affect Reported Availability of a Rental Unit?

    Science.gov (United States)

    Barata, Paula C.; Stewart, Donna E.

    2010-01-01

    Individual battered women have reported experiencing housing discrimination, but the extent of this problem has not been examined. This research used two experiments and a survey to determine if landlord discrimination could keep women from accessing rental units. In Study 1, a confederate asked 181 landlords about the availability of a rental…

  1. Return of IEEE Std 627 and its Value to Equipment Qualification Programs

    International Nuclear Information System (INIS)

    Horvath, D.A.

    2012-01-01

    IEEE Std 627 ''Design Qualification of Safety Systems Equipment Used in Nuclear Power Generating Stations'' was issued to more generically establish qualification requirements in the form of a high level umbrella document. Efforts on this standard began in late 1975 at the request of the IEEE Nuclear Standards Management Board. In 1977 a joint ASME/IEEE agreement established responsibility for qualification and quality assurance standards preparation. ASME accepted responsibility for Quality Assurance and IEEE for qualification. In accordance with that agreement, IEEE completed the generic qualification standard in 1980. This document provided high level approaches, criteria, guidance, and principles for qualification of both electrical and mechanical equipment that at that time appeared in no other industry standard. IEEE Std 627-1980 was later reaffirmed in 1996. In 1986, ASME's Board on Nuclear Codes and Standards directed its Committee on Qualification of Mechanical Equipment (QME) to develop a standard for qualifying mechanical equipment. This task was completed in several parts during the time frame from 1992 to 1994. Partly in response to this activity, IEEE Std 627 was withdrawn in 2002. Later although withdrawn, it was found that IEEE Std 627 was continuing to be used and referenced by many entities both in the US and other countries including in ASME's QME-1-2002 ''Qualification of Active Mechanical Equipment Used in Nuclear Power Plants'', US NRC's NUREG-0800 Standard Review Plan Section 3.11, at least one reactor vendor's Design Certification Document (DCD), several international licensing documents, and elsewhere. As a result, in 2007, the IEEE Standards Board authorized Working Group 2.10 of Subcommittee 2 (Qualification) of the Power and Energy Society's Nuclear Power Engineering Committee to resurrect and update IEEE Std 627-1980 (Reaff 1996). The result was the culmination IEEE Std 627 in 2010. This paper will report on the eight improvements made

  2. Land rental market, off-farm employment and agricultural production in Southeast China: A plot-level case study

    NARCIS (Netherlands)

    Feng, S.; Heerink, N.; Ruben, R.; Qu, F.

    2010-01-01

    This paper performs a plot-level analysis of the impact of land rental market participation and off-farm employment on land investment, input use, and rice yields for 215 plots cultivated by 52 households in three villages in Northeast Jiangxi Province. Our findings show that households that rent

  3. Demonstration of Advanced Geophysics and Classification Methods on Munitions Response Sites: Closed Castner Range Fort Bliss, TX

    Science.gov (United States)

    2016-04-01

    Basin has had a history of continuous, closed basin deposition, with Kansas playa complexes possibly united with Lake Cabeza de Vaca and/or Lake Lucero...Preparation Set up onsite project area Vegetation trimming Install blind seed items Labor Equipment rental Supplies Travel $74,499 TEMTADS Data...2,200 cued shots including re-collect, background, and IVS measurements) Project Geophysicist Equipment rental Supplies Travel $120,140 TEMTADS Data

  4. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem

    Science.gov (United States)

    Vahdani, Behnam; Jolai, Fariborz; Tavakkoli-Moghaddam, Reza; Meysam Mousavi, S.

    2012-07-01

    Maintenance outsourcing can be regarded as a strategic weapon to increase productivity and customer satisfaction in many companies, and this critical activity can be performed in a more efficient and effective way. This article presents two novel fuzzy possibilistic bi-objective zero-one programming (FPBOZOP) models for outsourcing of the equipment maintenance. In these models, cost parameters, including outsourcing cost, risk cost, time operations for performing the equipment maintenance and reliability level, as well as other influential parameters are considered through the outsourcing process. Moreover, the presented models can measure the capability of the company in doing different activities, unlike previous studies, in order to see the possibility of maintenance in-house, and can lead to make a best decision on the basis of the models' results. Both models are developed under uncertainty, which bring top managers the possibility of assigning more than one equipment or project to the supplier so that the profit is maximized, and the cost is minimized by considering bi-objectives concurrently. Then, a new fuzzy mathematical programming based possibilistic approach is introduced as a solution methodology from the recent literature to solve the proposed bi-objective zero-one programming (BOZOP) models and to reach a preferred compromise solution. Furthermore, a real-case study is utilized to demonstrate and to validate the effectiveness of the presented models. The computational results revealed that the models can be implemented in variety of problems in the domain of the equipment maintenance outsourcing and project outsourcing either from theory or application perspectives.

  5. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  6. Personal Protective Equipment

    National Research Council Canada - National Science Library

    1998-01-01

    ... of personal protective equipment A safety program for new employees is a necessary part of any orientation program An on-going safety program should be used to motivate employees to continue to use...

  7. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  8. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  9. 49 CFR 23.47 - What is the base for a recipient's goal for concessions other than car rentals?

    Science.gov (United States)

    2010-10-01

    ... Transportation PARTICIPATION OF DISADVANTAGED BUSINESS ENTERPRISE IN AIRPORT CONCESSIONS Goals, Good Faith... rental operations. (c) The dollar amount of a management contract or subcontract with a non-ACDBE and the gross receipts of business activities to which a management or subcontract with a non-ACDBE pertains are...

  10. Intelligent Processing Equipment Research and Development Programs of the Department of Commerce

    Science.gov (United States)

    Simpson, J. A.

    1992-01-01

    The intelligence processing equipment (IPE) research and development (R&D) programs of the Department of Commerce are carried out within the National Institute of Standards and Technology (NIST). This institute has had work in support of industrial productivity as part of its mission since its founding in 1901. With the advent of factory automation these efforts have increasingly turned to R&D in IPE. The Manufacturing Engineering Laboratory (MEL) of NIST devotes a major fraction of its efforts to this end while other elements within the organization, notably the Material Science and Engineering Laboratory, have smaller but significant programs. An inventory of all such programs at NIST and a representative selection of projects that at least demonstrate the scope of the efforts are presented.

  11. Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 3. Recommendations for improvement of equipment qualification methodology and criteria. Volume 3

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-08-01

    The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 3 presents recommendations for improvement of equipment qualification methodology and procedural clarification/modification. The fifth category identifies issues where adequate information does not exist to allow a recommendation to be made

  12. Mississippi Curriculum Framework for Diesel Equipment Technology (CIP: 47.0605--Diesel Engine Mechanic & Repairer). Postsecondary Programs.

    Science.gov (United States)

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which is intended for use by community and junior colleges throughout Mississippi, contains curriculum frameworks for the course sequences in the diesel equipment technology programs cluster. Presented in the introductory section are a description of the program and suggested course sequence. Section I lists baseline competencies,…

  13. ANALYSIS OF PROCESS OF PROCUREMENT OF TRANSPORTATION EQUIPMENT OF A SMALL COMPANY

    Directory of Open Access Journals (Sweden)

    Cleverson Faber de Assis

    2018-03-01

    Full Text Available The case study presented here is to analyze the costs of purchase, hire or simple hiring of freight to carry out the transport of a manufacturer of insulated panels in the Greater São Paulo. The survey showed, as main objective, the comparison and evaluation of maintenance costs of the vehicle fleet in the case of own equipment the equipment rental value if the option is outsourcing the fleet. Justified the study, because transport is an extremely important activity within the company's logistics operation in question. The transport operation must be operated with the greatest possible efficiency, since it has a direct impact on product costs. The method used was the absorption costing, identifying all costs per vehicle. This method is based on the allocation of direct costs to the object according to their consumption. The methodology ranked as the purpose was exploratory and descriptive. As for the means they were used bibliographical research, document and case study. The approach to the problem was quantitative. With the presented results was simulated an investment plan, showing the advantages and disadvantages of each scenario presented above.

  14. The Integration of GPS Navigator Device with Vehicles Tracking System for Rental Cars Firms

    OpenAIRE

    Omarah O. Alharaki; Fahad S. Alaieri; Akram M. Zeki

    2010-01-01

    The aim of this research is to integrate the GPS tracking system (tracking device and web-based application) with GPS navigator for rental cars, allowing the company to use various applications to monitor and manage the cars. This is enable the firms and customers to communicate with each other via the GPS navigator. The system should be developed by applying new features in GPS tracking application devices in vehicles. This paper also proposes new features that can be applied to the GPS Navi...

  15. 78 FR 54197 - Energy Efficiency Program for Commercial and Industrial Equipment: Energy Conservation Standards...

    Science.gov (United States)

    2013-09-03

    .... EERE-2013-BT-STD-0030] RIN 1904-AD01 Energy Efficiency Program for Commercial and Industrial Equipment: Energy Conservation Standards for Commercial Packaged Boilers AGENCY: Office of Energy Efficiency and..., Office of Energy Efficiency and Renewable Energy, Building Technologies Office, EE-2J, 1000 Independence...

  16. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  17. 78 FR 79423 - Energy Efficiency Program for Industrial Equipment: Petition of CSA Group for Classification as a...

    Science.gov (United States)

    2013-12-30

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy [Docket No. EERE-2013-BT-DET-0053] Energy Efficiency Program for Industrial Equipment: Petition of CSA Group for Classification as a Nationally Recognized Certification Program for Small Electric Motors AGENCY: Office of Energy Efficiency and...

  18. Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 4. Use of fragility in seismic design of nuclear plant equipment. Volume 4

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-08-01

    The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which have covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 4 presents study of the use of fragility concepts in the design of nuclear plant equipment and compares the results of state-of-the-art proof testing with fragility testing

  19. 45 CFR 95.707 - Equipment management and disposition.

    Science.gov (United States)

    2010-10-01

    ... participation in the costs of replacement equipment shall be limited to the additional outlay. (4) If the... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment management and disposition. 95.707... PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.707 Equipment management and disposition...

  20. Summary of work completed under the Environmental and Dynamic Equipment Qualification research program (EDQP)

    International Nuclear Information System (INIS)

    Steele, R. Jr.; Bramwell, D.L.; Watkins, J.C.; DeWall, K.G.

    1994-02-01

    This report documents the results of the main projects undertaken under the Environmental and Dynamic Equipment Qualification Research Program (EDQP) sponsored by the U.S. Nuclear Regulatory Commission (NRC) under FIN A6322. Lasting from fiscal year 1983 to 1987, the program dealt with environmental and dynamic (including seismic) equipment qualification issues for mechanical and electromechanical components and systems used in nuclear power plants. The research results have since been used by both the NRC and industry. The program included seven major research projects that addressed the following issues: (a) containment purge and vent valves performing under design basis loss of coolant accident loads, (b) containment piping penetrations and isolation valves performing under seismic loadings and design basis and severe accident containment wall displacements, (c) shaft seals for primary coolant pumps performing under station blackout conditions, (d) electrical cabinet internals responding to in-structure generated motion (rattling), and (e) in situ piping and valves responding to seismic loadings. Another project investigating whether certain containment isolation valves will close under design basis conditions was also started under this program. This report includes eight main section, each of which provides a brief description of one of the projects, a summary of the findings, and an overview of the application of the results. A bibliography lists the journal articles, papers, and reports that document the research

  1. 76 FR 38352 - Notice of Funding Availability: Rural Development Voucher Program

    Science.gov (United States)

    2011-06-30

    ... available to low income tenants of Rural Development-financed multifamily properties where the Section 515... Development's Section 515 Rural Rental Housing Program (515 property) who may be subject to economic hardship through prepayment of the Rural Development mortgage. When the owner of a 515 property pays off the loan...

  2. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  3. Quality Control Program for radiodiagnostic equipment on the Department of Antioquia, Colombia

    International Nuclear Information System (INIS)

    Beltran, Camilo; Viloria, Carolina; Puerta, Anselmo; Morales, Javier; Martinez, Piedad

    2008-01-01

    The Health Sectional Direction of Antioquia DSSA and the National University of Colombia campus Medellin have been formalizing inter-administrative agreements to realize Quality Control Studies on the institutions of medical radiodiagnostics of the department. In the first phase of the project on 2006, quality control studies were completed on 40 conventional and 31 mammography equipment, in the second phase by the end of 2006, 21 fluoroscopy, interventionism and C arms equipment were also studied; the third phase, finished by the end of 2007, counted with 50 conventional equipment. The tests proposed on the ARCAL XLIX IAEA protocol, tests on the installations, on the generator, on the image systems and the patient dosimetry were performed. From the evaluations on the installations, reports with relevant recommendations to be considerate and implemented to perform a better use of own resources on each institution were elaborated. On this paper, current results, impact on the participating institutions and the benefits from the applications that these kinds of practices bring to the institutions are presented. Finally, the necessity to advance towards clear politics in order to impulse the implementation of quality assurance programs in radiodiagnostic institutions, looking to improve the quality of diagnostic images with patient benefits, higher trust on technical conditions of equipment for a better and adequate diagnose, as well as to advance on processes seeking the optimization of radiological protection on the patient and the personnel occupationally exposed, is presented. (author)

  4. 78 FR 11996 - Energy Efficiency Program for Commercial and Industrial Equipment: Commercial and Industrial Pumps

    Science.gov (United States)

    2013-02-21

    .... EERE-2011-BT-STD-0031] RIN 1904-AC54 Energy Efficiency Program for Commercial and Industrial Equipment: Commercial and Industrial Pumps AGENCY: Office of Energy Efficiency and Renewable Energy, Department of... CONTACT: Mr. Charles Llenza, U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy...

  5. 76 FR 59715 - Notice of Submission of Proposed Information Collection to OMB Energy Innovation Fund-Multifamily...

    Science.gov (United States)

    2011-09-27

    ... programs; payment standards for the Rental Voucher program; and any other programs whose regulations... computers to select statistically random samples of telephone numbers to locate certain types of rental...

  6. 76 FR 35905 - Notice of Proposed Information Collection for Public Comment: Section 8 Fair Market Rent Surveys

    Science.gov (United States)

    2011-06-20

    ... programs; payment standards for the Rental Voucher program; and any other programs whose regulations... computers to select statistically random samples of telephone numbers to locate certain types of rental...

  7. The history and development of NASA survival equipment.

    Science.gov (United States)

    Radnofsky, M. I.

    1972-01-01

    A research and development program on survival equipment was begun in early 1960 with the Mercury Program. The Mercury survival kit is discussed together with Gemini survival equipment, and Apollo I survival equipment. A study program is conducted to assess potential survival problems that may be associated with future space flights landing in polar waters. Survival kit requirements for applications on the Skylab program are also considered. Other investigations are concerned with the design of a global survival kit in connection with Space Shuttle missions.

  8. Constellation Program Electrical Ground Support Equipment Research and Development

    Science.gov (United States)

    McCoy, Keegan S.

    2010-01-01

    At the Kennedy Space Center, I engaged in the research and development of electrical ground support equipment for NASA's Constellation Program. Timing characteristics playa crucial role in ground support communications. Latency and jitter are two problems that must be understood so that communications are timely and consistent within the Kennedy Ground Control System (KGCS). I conducted latency and jitter tests using Alien-Bradley programmable logic controllers (PLCs) so that these two intrinsic network properties can be reduced. Time stamping and clock synchronization also play significant roles in launch processing and operations. Using RSLogix 5000 project files and Wireshark network protocol analyzing software, I verified master/slave PLC Ethernet module clock synchronization, master/slave IEEE 1588 communications, and time stamping capabilities. All of the timing and synchronization test results are useful in assessing the current KGCS operational level and determining improvements for the future.

  9. Creating Three New Bike Tours in Santiago de Chile Case Study: Huaso Tours & Bike Rental

    OpenAIRE

    Heino, Jenni

    2015-01-01

    The purpose of this Bachelor´s thesis was to create new bike tour services for the thesis case company Huaso Tours & Bike Rental, based in Santiago de Chile. The idea for the thesis was perceived from a free time activity of mountain biking in Santiago de Chile´s popular tourist attraction San Cristobal hill. This park draws thousands of bikers monthly to enjoy the green areas of the city, however, there is no mountain bike service offered to visit this hill. By conducting a small pre-researc...

  10. 77 FR 38375 - Advisory Circular (AC) 150/5345-53D, Airport Lighting Equipment Certification Program; Proposed...

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Advisory Circular (AC) 150/5345-53D... Advisory Circular (AC) 150/5345-53D, Airport Lighting Equipment Certification Program, is being circulated... on a separate document and not embedded in the draft AC. Additionally, please provide justification...

  11. 45 CFR 95.705 - Equipment costs-Federal financial participation.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment costs-Federal financial participation... INSURANCE PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.705 Equipment costs—Federal financial participation. (a) General rule. In computing claims for Federal financial participation...

  12. Exposure parameters in fluoroscopy equipment. Quality control

    International Nuclear Information System (INIS)

    Alonso, M.; Castaneda, M.J.; Matorras, P.; Diaz-Caneja, N.; Gutierrez, I.

    1992-01-01

    Within the quality control program in Diagnostic Radiology currently being undertaken at the 'Marques de Valdecilla' University Hospital, the corresponding specification and procedure prototypes for the control of conventional radioscopy equipment have been elaborated and applied. This paper presents the values proposed in the specifications and those obtained for the following radioscopy equipment parameters: reference kerma, and its reproducibility, kerma linearity, maximum kerma at the skin, and total filtration. The results obtained indicate that the equipment studied could comply with specified requirements if a Maintenance Program were to be implemented in coordination with the Quality Control Program. (author)

  13. 40 CFR 1054.626 - What special provisions apply to equipment imported under the Transition Program for Equipment...

    Science.gov (United States)

    2010-07-01

    ... EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT Special Compliance Provisions § 1054... provisions of this section and send us an annual report, as follows: (1) Notify the Designated Compliance... and manufacturing equipment. Companies that import equipment into the United States without meeting...

  14. Qualification of electrical equipment. A United States nuclear system supplier perspective

    International Nuclear Information System (INIS)

    Jordan, W.G.

    1978-01-01

    At Westinghouse Pressurized Water Reactor Systems Division (PWR-SD) qualification. of safety related electrical equipment can be segregated into three distinct generations: (1) the initial seismic and environmental qualification programs for electrical equipment (1969-1972); (2) the supplemental sismic and environmental qualification programs (1975-1977); and (3) the seismic and environmental qualification programs to meet IEEE-323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations''(1975). The latter two programs (in a licensing framework), as they are most current, with emphasis on electrical equipment (e.g. transmitters, rack mounted equipment) as opposed to electro-mechanical equipment (valve operators, pump motors) are reviewed. (author)

  15. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  16. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  17. 75 FR 17943 - Notice of Proposed Information Collection for Public Comment: Section 8 Random Digit Dialing Fair...

    Science.gov (United States)

    2010-04-08

    ... Management and Property Disposition programs; payment standards for the Rental Voucher program; and any other... select statistically random samples of telephone numbers to locate certain types of rental housing units...

  18. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  19. An overview of equipment survivability studies at Sandia National Laboratories (SNL)

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Craft, Ch.M.; McCulloch, W.H.; Sebrell, W.A.

    1983-01-01

    The USNRC sponsors a number of programs at Sandia National Laboratories (SNL) specifically addressing safety-related equipment survivability. The major thrust of these programs has been the physical testing of equipment. Test results illustrate the importance of a dedicated equipment design effort giving particular attention to the safety implications of the equipment operation. Several equipment survivability tests here have revealed equipment design and test-related deficiencies

  20. US8,994,532 "Data Center Equipment Location and Monitoring System"

    DEFF Research Database (Denmark)

    2014-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database. The software application program...

  1. 76 FR 56781 - Privacy Act of 1974; Notice of a Computer Matching Program Between the Department of Housing and...

    Science.gov (United States)

    2011-09-14

    ... require additional verification to identify inappropriate or inaccurate rental assistance, and may provide... Affordable Housing Act, the Native American Housing Assistance and Self-Determination Act of 1996, and the... matching activities. The computer matching program will also provide for the verification of social...

  2. 24 CFR 1000.142 - What is the “useful life” during which low-income rental housing and low-income homebuyer housing...

    Science.gov (United States)

    2010-04-01

    ... Activities § 1000.142 What is the “useful life” during which low-income rental housing and low-income... recipient shall describe in its IHP its determination of the useful life of each assisted housing unit in... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What is the âuseful lifeâ during...

  3. The role of a certified calibration laboratory in a station's measuring and test equipment calibration, repair, and documentation program

    International Nuclear Information System (INIS)

    Ebenstreit, K.; MacIntosh, N.

    1995-01-01

    This paper outlines the role of a Certified Calibration Laboratory in- ensuring that the requirements of Measuring and Test Equipment calibration, identification, and traceability are met and documented. The Nuclear environment is one which is subject to influences from numerous 'quality agents'. One of the fields which comes under the scrutiny of the quality agents is that of equipment calibration and repair (both field components and M and TE). There is a responsibility to produce a superior product for the Ontario Consumer. The maintenance and calibration of Station Systems and their components have a direct impact on this output. The Measuring and Test Equipment element in each of these needs can be addressed by having a defined group of Maintenance Staff to execute a Measuring and Test Equipment Program which meets specific parameters. (author)

  4. Interventional suite and equipment management: cradle to grave

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, Keith J. [Harvard Medical School, Radiology Physics and Engineering, Children' s Hospital Boston, Boston, MA (United States)

    2006-09-15

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  5. Interventional suite and equipment management: cradle to grave

    International Nuclear Information System (INIS)

    Strauss, Keith J.

    2006-01-01

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  6. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  7. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  8. Medicare and Medicaid fraud and abuse regulations.

    Science.gov (United States)

    Liang, F Z; Black, B L

    1991-11-01

    Specific business arrangements that are protected under legislation and regulations governing parties doing business with Medicare or Medicaid are discussed. Regulations implementing the Medicare and Medicaid Patient Protection Act of 1987 specify practices and activities that are not subject to criminal penalties under the antikickback provisions of the Social Security Act or to exclusion from Medicare or state health-care programs. As of July 29, 1991, all organized health-care settings that receive payments from either Medicare or state health-care programs must comply with these regulations. The final rule sets forth "safe harbors"--exceptions to prohibitions against (1) kickbacks, bribes, rebates, and other illegal activities involving remunerations for patient referrals and (2) inducements to purchase or lease goods paid for by Medicare or state health-care programs. The safe harbors comprise 11 broad categories--investment interests, space rental, equipment rental, personal services and management contracts, purchase of a medical practice, referral services, warranties, discounts, employees, group purchasing organizations, and waiver of deductibles and coinsurance. Implications for pharmacy are discussed. These regulations will affect the purchase of pharmaceuticals by institutional pharmacies. Each institution should review its current practices to determine whether they are within the safe harbors.

  9. 7 CFR 3015.168 - Disposal of equipment.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.168 Disposal of equipment. When original or replacement equipment is no longer to be used in projects or programs currently or... 7 Agriculture 15 2010-01-01 2010-01-01 false Disposal of equipment. 3015.168 Section 3015.168...

  10. Users manual. Pursuit program of use licenses of radioactive material or generator equipment of ionizing radiations

    International Nuclear Information System (INIS)

    Becerril M, V.M.; Villarreal, J.E.

    1992-05-01

    The objective of the program 'Databases for the pursuit of licenses of use of radioactive material', it consists on the application of a computer system carried out in dbase IV that it allows the control of the all the information related with those licenses for use, possession and storage of radioactive material or generator equipment of ionizing radiations. (Author)

  11. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  12. 24 CFR 103.10 - What can I do if I believe someone is discriminating against me in the sale, rental, finance, or...

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false What can I do if I believe someone is discriminating against me in the sale, rental, finance, or advertisement of housing? 103.10 Section 103.10 Housing and Urban Development Regulations Relating to Housing and Urban Development OFFICE OF ASSISTANT SECRETARY FOR EQUAL OPPORTUNITY,...

  13. Laboratory services series: an electrical outlet and corded equipment inspection program

    International Nuclear Information System (INIS)

    Davis, E.A.

    1976-04-01

    A research and development laboratory has thousands of electrical outlets providing power to laboratories, offices, shops, and service areas. These outlets provide power for a wide variety of portable equipment and tools that are equipped with cord and plug. Electric safety requires a periodic check of outlet grounding capability and continuing inspection and repair of corded equipment. Personnel, equipment, reports, procedures, and schedule requirements are reported

  14. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  15. Systematic Model for Validating Equipment Uses in Selected Marketing and Distribution Education Programs. Final Report, February 1, 1980-June 30, 1981.

    Science.gov (United States)

    Gildan, Kate; Buckner, Leroy

    Research was conducted to provide a model for selecting equipment for marketing and distributive education programs that was required for the development of the skills or competencies needed to perform in marketing and distribution occupation. A research of the literature identified both competency statements for three program areas--Fashion…

  16. Health Complaints Associated with Poor Rental Housing Conditions in Arkansas: The Only State without a Landlord's Implied Warranty of Habitability.

    Science.gov (United States)

    Bachelder, Ashley E; Stewart, M Kate; Felix, Holly C; Sealy, Neil

    2016-01-01

    Arkansas is the only U.S. state that does not have a landlord's implied warranty of habitability, meaning tenants have a requirement for maintaining their rental properties at certain habitability standards, but landlords are not legally required to contribute to those minimum health and safety standards. This project assessed the possibility that this lack of landlord responsibility affects tenants' perceived health. Using surveys and interviews, we collected self-reported data on the prevalence and description of problems faced by renters who needed household repairs from their landlords. Of almost 1,000 renters, one-third of them had experienced a problem with their landlord making needed repairs; and one-quarter of those had a health issue they attributed to their housing conditions. Common issues included problems with plumbing, heating, or cooling systems, and pest or rodent control. Reported health problems included elevated stress levels, breathing problems, headaches, high blood pressure, and bites or infections. Hispanic respondents and those with less than a high school education were both significantly more likely to report problems with their landlords not making repairs as requested. These data suggest that the lack of landlord requirements may negatively impact the condition of rental properties and, therefore, may negatively impact the health of Arkansas renters.

  17. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

    2004-05-27

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small

  18. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  19. 76 FR 55084 - Announcement of Funding Awards for the Section 202 Supportive Housing for the Elderly Program...

    Science.gov (United States)

    2011-09-06

    ... Pembroke Pines, FL Miami Jewish Home & Hospital Capital Advance: $10,634,700 Three-year Rental Subsidy...: 42 Illinois Chicago, IL Cath Charities Hsg Devl Corp Capital Advance: $6,617,100 Three-year Rental... Charities of Louisville Capital Advance: $2,763,200 Three-year Rental Subsidy: $249,600 Number of Units: 24...

  20. An overview of equipment survivability studies at Sandia National Labs. (SNL): Chapter 3

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Craft, C.M.; McCulloch, W.H.; Sebrell, W.A.

    1983-01-01

    The USNRC sponsors a number of programs at Sandia National Laboratories (SNL) specifically addressing safety-related equipment survivability. The major thrust of these programs has been the physical testing of equipment. Test results illustrate the importance of a dedicated equipment design effort giving particular attention to the safety implications of the equipment operation. Several equipment survivability tests here have revealed equipment design and test-related deficiencies

  1. The Bosnian Train and Equip Program: A Lesson in Interagency Integration of Hard and Soft Power

    Science.gov (United States)

    2014-03-01

    even before Bos- nia officially declared independence. Most of the weaponry and commanders from the former Yugoslav People’s Army in Bosnia, which was...ability, and disposition.” 505 It covers characteristics that research indicates affect team performance including attitudinal, de- mographic, and...The Train and Equip Program reduced foreign influence in the Federation, which helped remove impediments to reconciliation and integration in Bos- nia

  2. Advantages of a program of quality control in the nuclear medicine equipment

    International Nuclear Information System (INIS)

    Trujillo Z, F.E.; Argumosa, E.; Herrera R, M.R.

    2007-01-01

    In Nuclear Medicine more 90% of the entirety of the carried out procedures its are with diagnostic ends where it is acquired one or several images. This makes indispensable to have an appropriate operation of the dedicated equipment to produce images and also of those non former images, as the activity caliper, to assure an appropriate quality diagnoses not from the images and the correct dose administration to the patient. In this work the main calibrations that should be carried out and an example of the program of quality control of a gamma camera mark Siemens and model E.CAM are presented. Considerations that should take as for the radiological protection are exposed. Comments on the parameters that correct the required calibrations and the images taken place by an operation or inadequate calibrations are included. In conclusion, the necessity of a program that it contains as minimum the quality control of the gamma cameras and of the activity caliper, having as main advantages a good image quality diagnoses and to minimize the dose imparted the patient are exposed. (Author)

  3. Developing ''SMART'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; SpencerR, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of: (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased finding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the ''Smart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations''. This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABB CENP), Sandia National Laboratories, Duke Engineering and Services (DE and S), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of smart equipment and predictive maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the Smart Equipment program will: (1) Identify and prioritize nuclear plant equipment that would most likely benefit from adding smart features; (2) Develop a methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i.e. smart equipment); (3) Develop a methodology to provide plant operators with real-time information through smart equipment Man-Machine Interfaces (MMI) to support their decision making; (4) Demonstrate the methodology on a targeted component and/or system; (5) Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed subtask

  4. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  5. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  6. Project management in nuclear equipment manufacture

    International Nuclear Information System (INIS)

    Liu Jiancheng

    2005-01-01

    The completion of the management organization shall be firstly considered in project management for a nuclear power plant. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press usr bearing equipment, and the vice general manager takes responsibility for the quality, technology and schedule related with the manufacture of the equipment, and organizes the organization department for the audit. The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel. The manufacture schedule shall be prepared to ensure the implementation feasibility, process continuity and flexibility. The schedule shall be followed and monitored for the whole process, to check and feedback the implementation. (authors)

  7. Health Complaints Associated with Poor Rental Housing Conditions in Arkansas: The Only State without a Landlord’s Implied Warranty of Habitability

    Science.gov (United States)

    Bachelder, Ashley E.; Stewart, M. Kate; Felix, Holly C.; Sealy, Neil

    2016-01-01

    Arkansas is the only U.S. state that does not have a landlord’s implied warranty of habitability, meaning tenants have a requirement for maintaining their rental properties at certain habitability standards, but landlords are not legally required to contribute to those minimum health and safety standards. This project assessed the possibility that this lack of landlord responsibility affects tenants’ perceived health. Using surveys and interviews, we collected self-reported data on the prevalence and description of problems faced by renters who needed household repairs from their landlords. Of almost 1,000 renters, one-third of them had experienced a problem with their landlord making needed repairs; and one-quarter of those had a health issue they attributed to their housing conditions. Common issues included problems with plumbing, heating, or cooling systems, and pest or rodent control. Reported health problems included elevated stress levels, breathing problems, headaches, high blood pressure, and bites or infections. Hispanic respondents and those with less than a high school education were both significantly more likely to report problems with their landlords not making repairs as requested. These data suggest that the lack of landlord requirements may negatively impact the condition of rental properties and, therefore, may negatively impact the health of Arkansas renters. PMID:27933288

  8. Health Complaints Associated with Poor Rental Housing Conditions in Arkansas: The Only State Without a Landlord’s Implied Warranty of Habitability

    Directory of Open Access Journals (Sweden)

    Ashley Bachelder

    2016-11-01

    Full Text Available Arkansas is the only U.S. state that does not have a landlord’s implied warranty of habitability, meaning tenants have a requirement for maintaining their rental properties at certain habitability standards, but landlords are not legally required to contribute to those minimum health and safety standards. This project assessed the possibility that this lack of landlord responsibility affects tenants’ perceived health. Using surveys and interviews, we collected self-reported data on the prevalence and description of problems faced by renters who needed household repairs from their landlords. Of almost 1000 renters, one third of them had experienced a problem with their landlord making needed repairs; and one-quarter of those had a health issue they attributed to their housing conditions. Common issues included problems with plumbing, heating or cooling systems, and pest or rodent control. Reported health problems included elevated stress levels, breathing problems, headaches, high blood pressure and bites or infections. Hispanic respondents and those with less than a high school education were both significantly more likely to report problems with their landlords not making repairs as requested. The data suggest that the lack of landlord requirements may negatively impact the condition of rental properties, and therefore may negatively impact the health of Arkansas renters.

  9. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  10. Refurbishment programs

    International Nuclear Information System (INIS)

    Irish, C.S.

    2004-01-01

    As nuclear plants age, equipment becomes obsolete, outdated or just simply unreliable. This puts a lot of emphasis on replacement of the subject equipment. This can be an expensive proposition for safety related equipment due to design changes, requalification charges and the cost of the new equipment, specifically when the original component is obsolete. The presentation will explain how comprehensive refurbishment programs on many different types of equipment can alleviate this situation. The refurbishment program is a systematic refurbishment of equipment to an as new condition by replacing all of the age sensitive components within the equipment. This is carried out on all of the same type of equipment in a scheduled program. For example the plant may to decide to refurbish all of their Lambda LME-24 power supplies, or all of their Bailey modules, or all of their Agastat DSC Series relays. Independent of the item the process is the same. Refurbish each piece of equipment to an as new condition by replacing all of the age sensitive equipment. The equipment is then returned to the client as safety related, existing qualification maintained and with a new service life/warranty. This is not a simple repair. It is a planned refurbishment to an as new condition of certain equipment types throughout the plant and then carried out from equipment piece to equipment piece. The refurbishment program may even include introducing new spares into the plant. This is normally performed by upgrading (dedicating for safety related use and refurbishing to an 'as new' condition) surplus equipment and using these equipment pieces in the rotation of the plant equipment to refurbish the entire population of a selected piece of equipment at the plant. This process can be performed on many equipment types including power supplies, circuit boards, modules, relays, motors, breakers, and many more. The refurbishment program greatly increases the reliability of the equipment without the

  11. Primary care characteristics and their association with health screening in a low-socioeconomic status public rental-flat population in Singapore- a mixed methods study.

    Science.gov (United States)

    Wee, Liang En; Cher, Wen Qi; Sin, David; Li, Zong Chen; Koh, Gerald Choon-Huat

    2016-02-06

    In Singapore, subsidized primary care is provided by centralized polyclinics; since 2000, policies have allowed lower-income Singaporeans to utilize subsidies at private general-practitioner (GP) clinics. We sought to determine whether proximity to primary care, subsidised primary care, or having regular primary care associated with health screening participation in a low socioeconomic-status public rental-flat community in Singapore. From 2009-2014, residents in five public rental-flat enclaves (N = 936) and neighboring owner-occupied precincts (N = 1060) were assessed for participation in cardiovascular and cancer screening. We then evaluated whether proximity to primary care, subsidised primary care, or having regular primary care associated with improved adherence to health screening. We also investigated attitudes to health screening using qualitative methodology. In the rental flat population, for cardiovascular screening, regular primary care was independently associated with regular diabetes screening (adjusted odds ratio, aOR = 1.59, CI = 1.12-2.26, p = 0.009) and hyperlipidemia screening (aOR = 1.82, CI = 1.10-3.04, p = 0.023). In the owner-occupied flats, regular primary care was independently associated with regular hypertension screening (aOR = 9.34 (1.82-47.85, p = 0.007), while subsidized primary care was associated with regular diabetes screening (aOR = 2.94, CI = 1.04-8.31, p = 0.042). For cancer screening, in the rental flat population, proximity to primary care was associated with less participation in regular colorectal cancer screening (aOR = 0.42, CI = 0.17-0.99, p = 0.049) and breast cancer screening (aOR = 0.29, CI = 0.10-0.84, p = 0.023). In the owner-occupied flat population, for gynecological cancer screening, usage of subsidized primary care and proximity to primary care was associated with higher rates of breast cancer and cervical cancer screening; however

  12. Developing ''smar'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; Spencer, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of : (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased funding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the S mart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations . This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABBCENP), Sandia National Laboratories, Duke Engineering and Services (DEandS), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of ''smart'' equipment and predicitve maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the ''smart'' quipment program will: 1. Identify the prioritize nulcear plant equipment that would most likely benefit from adding smart features, 2. Developa methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i. e. ''smart'' equipment), 3. Developa methodology to provide plant operators with real-time information through ''smart'' equipment Man-Machine Interfaces (MMI) to support their decision making, 4. Demonstrate the methodology on a targeted component and/or system, 5. Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed

  13. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  14. Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2013-02-01

    The purpose of this report is to describe programs and tools for assessment of accomplished and documented qualification with respect to ageing of electrical equipment and for development of complimentary ageing management programs. In addition to description of complete programs for management of ageing, tools for validation of the status with regard to ageing of installed ('old') equipment and, where needed, for complementation of their qualification are also included. The report is restricted to safety related equipment containing ageing sensitive parts, mainly organic materials. To this category belong cables and cable joints and a number of equipment containing oils, seals (o-rings), etc. For equipment located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. The main part of this report deals with the qualification of such equipment. Some safety related equipment outside the containment can be located in areas where they are subjected to high temperature and other excessive environmental stresses during normal operation and in areas affected by an accident. Therefore, some material is given also on qualification of equipment located outside containment with better possibilities for frequent inspection and supervision. Part 1 of the report is an executive summary with a general review of the methodologies and their application. The more detailed description of the programs and underlying material, useful data, etc. is given in Part 2

  15. Evaluation of the Nuclear Medicine facilities in Minas Gerais state: quality control program of equipment

    International Nuclear Information System (INIS)

    Kubo, Tadeu Takao Almodovar; Biancardi, Rodrigo; Rocha, Adriana Marcia Guimaraes; Ferreira, Denia Romao; Silva, Franciele Aquiles Anjos; Assuncao, Jonathan Buenos Aires; Alves, Ederson Henrique; Almeida, Ana Flavia Batista; Alves, Nathalia Fernandes; Xavier, Faber Henrique Zacarias; Gontijo, Rodrigo Modesto Gadelha; Mamede, Marcelo; Universidade Federal de Minas Gerais

    2017-01-01

    With the reformulation of the CNEN-NN-3.05 standard in December 2013, Brazil's Nuclear Medicine (NMS) services have to perform a greater number of quality controls for SPECT and PET equipment. However, little is known about the reality of the quality control programs of these services regarding the application of the new standard. Thus, in this context, the objective of the present study was to evaluate the quality control program of MNSs in the state of Minas Gerais. All NMSs in the state of Minas Gerais were invited to participate in the project. Of these, 34.48% (20 facilities) agreed to participate in the project, 50.00% (29 facilities) did not respond to the invitation and 15.52%(9 facilities) declined their participation. Thus, as of November 2015, 20 SPECT and 2 PET/CT equipment were evaluated for the performance of the quality control tests recommended by the new CNEN standard. The phantoms required for the evaluation came from the Laboratory of Dosimetry and Quality Control of UFMG. Even with the deadlines set by CNEN for the implementation of the quality control program in the NMSs, more than 50% of the evaluated services did not implement the quality controls, and the absence of specific phantoms is the main reason for the failure. Among the problems found in the installations, the most critical were: collimators with no conditions of use in the clinical routine, linearity problems of the evaluated image and values of image uniformity superior to the limits of acceptance. Problems in the uniformity and linearity of the image found directly impacted the performance of other tests, such as spatial resolution, SPECT performance, among others. In a general way, the NMSs in the state of Minas Gerais evaluated with the present study are in clinical feasible conditions. (author)

  16. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  17. Application of Asset-backed Securitization to Finance in Public Rental Housing Project%资产支撑证券化在公共租赁住房项目融资中的应用

    Institute of Scientific and Technical Information of China (English)

    王海硕; 陈建明

    2014-01-01

    At present,the construction of indemnificatory apartments in China is facing enormous financial pressure. To address the public rental housing project financing difficulties,this paper has carried on thorough discussion on the application of asset-backed securitization financing model. The paper introduces the concepts and features of asset-backed securitization model and analysis of the feasibility and operation mechanism of public rental housing projects financing in securitization. Combined with the public rental housing project in Jiangning District,the realization of asset-backed securitization is discussed. Studies have shown that asset-backed securitization can effectively solve the funding gap of public rental housing and put forward new ideas for financing problems of indemnificatory apartments.%目前,我国保障性住房建设面临巨大的融资压力。为了解决公共租赁住房项目的融资困境,对资产支撑证券化融资模式的应用进行了深入探讨。详细介绍了资产支撑证券化模式的含义与特征,分析了公共租赁住房项目证券化融资的可行性和运作机制,并结合南京市江宁区公租房项目的具体情况,构想了资产支撑证券化的实现途径。研究表明,资产支撑证券化能够有效解决公共租赁住房项目的资金缺口,为我国保障房建设融资提出了新思路。

  18. 32 CFR 644.45 - Rental value.

    Science.gov (United States)

    2010-07-01

    ... low value. A brief summary of the essential facts will be sufficient to support leases by the...) Equipment and accessories: Refrigeration Cooking facilities Kitchen cabinets Closet space Built-in...

  19. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  20. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  1. ENERGY STAR Certified Imaging Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 2.0 ENERGY STAR Program Requirements for Imaging Equipment that are effective as of...

  2. Evaluation of an integrated housing and recovery model for people with severe and persistent mental illnesses: the Doorway program.

    Science.gov (United States)

    Dunt, David R; Benoy, Andrew W; Phillipou, Andrea; Collister, Laura L; Crowther, Elizabeth M; Freidin, Julian; Castle, David J

    2017-10-01

    Objective The Doorway program is a 3-year pilot integrated housing and recovery support program aimed at people with a severe and persistent mental illness who are 'at risk' or actually homeless. Participants source and choose properties through the open rental market, with appropriate rental subsidy and brokerage support. This arrangement is highly innovative, differing from widely favoured arrangements internationally involving congregate and scattered-site housing owned or managed by the support program. The aim of the present study was to determine the effects of the Doorway program on participants' health, housing, service utilisation and costs. Methods A pre-post study design was used with outcome measures consisting of a number of question inventories and their costs (where relevant). The principal inventories were the Behaviour and Symptom Identification Scale 32 (BASIS-32), a consumer-oriented, self-report measure of behavioural symptoms and distress, the Health of the Nation Outcome Scale (HoNOS), an interviewer-administered measurement tool designed to assess general health and social functioning of mentally ill people and the Outcomes Star (Homelessness) system which measures various aspects of the homelessness experience. Baseline measurements were performed routinely by staff at entry to the program and then at 6-monthly intervals across the evaluation period. Results For 55 of 59 participants, total mean BASIS-32 scores (including as well three of five subscale scores) improved significantly and with moderate effect size. Four of the 10 domain scores on the Outcome Star (Homelessness) inventory also improved significantly, with effect sizes ranging from small-medium (three domains) to large (one domain). Mean usage of bed-based mental health clinical services and general hospital admissions both significantly decreased (with overall net savings of A$3096 per participant per annum). Overall cost savings (including housing) to government ranged from A

  3. Equipment inspection function; A funcao inspecao de equipamentos

    Energy Technology Data Exchange (ETDEWEB)

    Bressan, Edemir [PETROBRAS (Brazil). Refinaria Alberto Pasqualini

    1994-04-01

    Development of the safety engineering and equipment inspection policy in petroleum industry, with emphasis to the refineries equipment, are discussed. Presentation of the accidents percentages in petroleum plants under international researches, with details of involved equipment, kind of accident, plant and causes are reported. The start and actual stage of the safety inspection program in the PETROBRAS are also presented 5 refs., 3 figs.

  4. 76 FR 30898 - Disadvantaged Business Enterprise: Program Improvements for Airport Concessions

    Science.gov (United States)

    2011-05-27

    ... originally set all race-neutral goals to start setting race-conscious concession-specific goals if it appeared that the race-neutral approach was not working. Section 26.53: As applied to ACDBEs, this amended...). Frequency: 1,071 non-car rental concessions; 449 car rental concessions, for a total of 1520, or an average...

  5. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  6. 40 CFR 82.36 - Approved refrigerant handling equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment. 82.36 Section 82.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Servicing of Motor Vehicle Air Conditioners § 82.36...-12, Extraction and Recycle Equipment for Mobile Automotive Air-Conditioning Systems, and Standard of...

  7. Financial Feasibility of Public Bike Rental Systems in Spain

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez-Diaz, A.G.; Sastre, J.; Lopez-Sanchez, A.D.; Cuello, M.; Molina, J.

    2016-07-01

    In recent years, many public bike rental systems have proliferated in Spain. Unfortunately, many have had to close because of their poor financial feasibility. The aim of this paper is twofold. On the one hand, a benchmarking of the main public bicycle systems in Spain is conducted, analysing the growth in the last decades, with special emphasis on successful systems and on the recently failed. In addition, the financial feasibility of some successful systems in Spain is analysed: Seville, Valencia and Barcelona. Thus, major factors directly related to the viability of such systems are discussed. A proper and correct knowledge of these factors is essential when making decisions in mobility policies. The main factors on which the management company may decide are: pricing policy (annual and weekly rate), advertising rates, and system dimensions (number of docking stations, anchors and bicycles). There are other external factors not directly controlled by the company (subscribers, occupancy rate of advertising space and system maintenance cost) but which are crucial to their feasibility. To achieve the aforementioned objectives, mobility studies in Seville (1400 surveys) and Barcelona (1000 surveys) were conducted in order to achieve more accurate parameter values (time cycling, distances, used rate, frequencies, etc.). Despite the similarities between the systems in Valencia and Seville, they have shown very different profitability. The high profitability in Valencia and Barcelona is highlighted in contrast to the case of the Seville system. (Author)

  8. NRC sponsored rotating equipment vibration research: a program description and progress report

    International Nuclear Information System (INIS)

    Nitzel, M.E.

    1986-01-01

    The Idaho National Engineering Laboratory (INEL) is currently involved in a research project sponsored by the United States Nuclear Regulatory Commission (NRC) regarding operational vibration in rotating equipment. The object of this program is to assess the nature of vibrational failures and the effect that improved qualification standards may have in reducing the incidence of failure. In order to limit the scope of the initial effort, safety injection (SI) pumps were chosen as the component group for concentrated study. The task has been oriented to addressing the issues of whether certain SI pumps experience more failures than others, examining the dynamic environments in operation, examining the adequacy of current qualification standards, and examining what performance parameters could be used more efficiently to predict degradation or failure. Results of a literature search performed to survey SI pump failures indicate that failures are due to a diversity of causes, many of which may not be influenced by qualification criteria. Cooperative efforts have been undertaken with a limited number of nuclear utilities to describe the variety of possible operating environments and to analyze available data. The results of this analysis as they apply to the research issues are presented and possibilities for the future direction of the program are discussed

  9. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  10. Characterization of changes in commercial building structure, equipment, and occupants: End-Use Load and Consumer Assessment Program

    Energy Technology Data Exchange (ETDEWEB)

    Lucas, R.G.; Taylor, Z.T.; Miller, N.E.; Pratt, R.G.

    1990-12-01

    Changes in commercial building structure, equipment, and occupants result in changes in building energy use. The frequency and magnitude of those changes have substantial implications for conservation programs and resource planning. For example, changes may shorten the useful lifetime of a conservation measure as well as impact the savings from that measure. This report summarizes the frequency of changes in a commercial building sample that was end-use metered under the End-Use Load and Consumer Assessment Program (ELCAP). The sample includes offices, dry good retails, groceries, restaurants, warehouses, schools, and hotels. Two years of metered data, site visit records, and audit data were examined for evidence of building changes. The observed changes were then classified into 12 categories, which included business type, equipment, remodel, vacancy, and operating schedule. The analysis characterized changes in terms of frequency of types of change; relationship to building vintage and floor area; and variation by building type. The analysis also examined the energy impacts of various changes. The analysis determined that the rate of change in commercial buildings is high--50% of the buildings experienced one type of change during the 2 years for which monitoring data were examined. Equipment changes were found to be most frequent in offices and retail stores. Larger, older office buildings tend to experience a wider variety of changes more frequently than the smaller, newer buildings. Key findings and observations are presented in Section 2. Section 3 provides the underlying motivation and objectives. In Section 4, the methodology used is documented, including the commercial building sample and the data sources used. Included are the definitions of change events and the overall approach taken. Results are analyzed in Section 5, with additional technical details in Appendixes. 2 refs., 46 figs., 22 tabs. (JF)

  11. The anti-CO2 tax upsets the automotive fleets management. Car makers must adapt themselves. Deluxe cars spared. Small and medium size companies tempted by the long duration rental. At Biogen, medical visitors chose their vehicle

    International Nuclear Information System (INIS)

    Larmor, P.

    2006-01-01

    Since the beginning of the year 2006, the pollution level is now taken into consideration in the calculation of the society vehicles tax. This measure completely upsets the management and allocation rules of provided cars. Therefore, the government foresees to relax its position. Car makers will have to propose new versions of their models with pollution levels in agreement with the tax categories imposed by the new regulation. Small and medium size companies are now tempted by long duration car rental contracts. Therefore, car rental companies foresee interesting opportunities with this fiscality stiffening. This press-kit analyzes the situation from the different points of view: fleet managers, car makers, users, company managers, car hirers. (J.S.)

  12. Cost-analysis of an oral health outreach program for preschool children in a low socioeconomic multicultural area in Sweden.

    Science.gov (United States)

    Wennhall, Inger; Norlund, Anders; Matsson, Lars; Twetman, Svante

    2010-01-01

    The aim was to calculate the total and the net costs per child included in a 3-year caries preventive program for preschool children and to make estimates of expected lowest and highest costs in a sensitivity analysis. The direct costs for prevention and dental care were applied retrospectively to a comprehensive oral health outreach project for preschool children conducted in a low-socioeconomic multi-cultural urban area. The outcome was compared with historical controls from the same area with conventional dental care. The cost per minute for the various dental professions was added to the cost of materials, rental facilities and equipment based on accounting data. The cost for fillings was extracted from a specified per diem list. Overhead costs were assumed to correspond to 50% of salaries and all costs were calculated as net present value per participating child in the program and expressed in Euro. The results revealed an estimated total cost of 310 Euro per included child (net present value) in the 3-year program. Half of the costs were attributed to the first year of the program and the costs of manpower constituted 45% of the total costs. When the total cost was reduced with the cost of conventional care and the revenue of avoided fillings, the net cost was estimated to 30 Euro. A sensitivity analysis displayed that a net gain could be possible with a maximal outcome of the program. In conclusion, the estimated net costs were displayed and available to those considering implementation of a similar population-based preventive program in areas where preschool children are at high caries risk.

  13. Simulation Environment Synchronizing Real Equipment for Manufacturing Cell

    Science.gov (United States)

    Inukai, Toshihiro; Hibino, Hironori; Fukuda, Yoshiro

    Recently, manufacturing industries face various problems such as shorter product life cycle, more diversified customer needs. In this situation, it is very important to reduce lead-time of manufacturing system constructions. At the manufacturing system implementation stage, it is important to make and evaluate facility control programs for a manufacturing cell, such as ladder programs for programmable logical controllers (PLCs) rapidly. However, before the manufacturing systems are implemented, methods to evaluate the facility control programs for the equipment while mixing and synchronizing real equipment and virtual factory models on the computers have not been developed. This difficulty is caused by the complexity of the manufacturing system composed of a great variety of equipment, and stopped precise and rapid support of a manufacturing engineering process. In this paper, a manufacturing engineering environment (MEE) to support manufacturing engineering processes using simulation technologies is proposed. MEE consists of a manufacturing cell simulation environment (MCSE) and a distributed simulation environment (DSE). MCSE, which consists of a manufacturing cell simulator and a soft-wiring system, is emphatically proposed in detail. MCSE realizes making and evaluating facility control programs by using virtual factory models on computers before manufacturing systems are implemented.

  14. Reactor vital equipment determination techniques

    International Nuclear Information System (INIS)

    Bott, T.F.; Thomas, W.S.

    1983-01-01

    The Reactor Vital Equipment Determination Techniques program at the Los Alamos National Laboratory is discussed. The purpose of the program is to provide the Nuclear Regulatory Commission (NRC) with technical support in identifying vital areas at nuclear power plants using a fault-tree technique. A reexamination of some system modeling assumptions is being performed for the Vital Area Analysis Program. A short description of the vital area analysis and supporting research on modeling assumptions is presented. Perceptions of program modifications based on the research are outlined, and the status of high-priority research topics is discussed

  15. Guide to good practices for equipment and piping labeling

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Equipment and Piping Labeling, Chapter XVIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing labeling programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Equipment and Piping Labeling is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated labeling program to promote safe and efficient operations.

  16. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  17. Incidents of chemical reactions in cell equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  18. Alternative Fuel and Advanced Technology Commercial Lawn Equipment

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-10-10

    The U.S. Department of Energy's Clean Cities program produced this guide to help inform the commercial mowing industry about product options and potential benefits. This guide provides information about equipment powered by propane, ethanol, compressed natural gas, biodiesel, and electricity, as well as advanced engine technology. In addition to providing an overview for organizations considering alternative fuel lawn equipment, this guide may also be helpful for organizations that want to consider using additional alternative fueled equipment.

  19. 40 CFR 160.63 - Maintenance and calibration of equipment.

    Science.gov (United States)

    2010-07-01

    ...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Equipment § 160.63 Maintenance and calibration of..., maintenance, testing, calibration, and/ or standardization of equipment, and shall specify, when appropriate... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Maintenance and calibration of...

  20. A programming system for a modular, flexible multicomputer system for the automatic control of automated test equipment

    International Nuclear Information System (INIS)

    Schmidt, J.

    1984-11-01

    The hardware used is operationally directed, consisting of largely self-functioning, micro-computing modules, combined together over a parallel systembus. For communication purposes between the modules and to synchronize their activities a multi microcomputing operating system is being developed which corresponds to the specific demands of computerized process-control (handling of real-word events under real-time conditions and operation of several parallel-running subprocesses). In order to program the user-specific test cycles a programming language has to be made available which can be coordinated with the operational range of specific test equipment in terms of commands and syntax and which can also easily be learned by operators having no specialised knowledge of data processing. With this objective in mind, a structural system is developed in this work, by the aid of which application-oriented programming languages can be implemented. The adaption of the programming system to a wide spectrum of applications in automatic testing is facilitated by its modular structure. The efficiency of the system is demonstrated by means of an industrial pilot-scale implementation. (orig./HP) [de

  1. ENERGY STAR Certified Small Network Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Small Networking Equipment that are effective as...

  2. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  3. Quick scan energy conservation investments in the social rental sector; Quick scan investeren in energiebesparing sociale huursector

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-15

    Through a brief examination it is inventoried to what extent Dutch government policy affects the number of projects and investment with regard to energy conservation in the social rental sector. June 2013, a brief questionnaire was sent by email to contacts of the Energy Team of the Dutch 'Woonbond' (association of (potential) tenants) to gain insight into the present situation. This report presents the results [Dutch] Via een kort onderzoek is geinventariseerd in hoeverre het kabinetsbeleid invloed heeft op het aantal projecten en investeringen in energiebesparing in de sociale huursector. In juni is via een korte vragenlijst per email onder contacten van het Energieteam van de Nederlandse Woonbond bij woningcorporaties gepeild wat de situatie is. In deze rapportage worden de resultaten weergegeven.

  4. Equipment qualification testing methodology research at Sandia Laboratories

    International Nuclear Information System (INIS)

    Jeppesen, D.

    1983-01-01

    The Equipment Qualification Research Testing (EQRT) program is an evolutionary outgrowth of the Qualification Testing Evaluation (QTE) program at Sandia. The primary emphasis of the program has been qualification methodology research. The EQRT program offers to the industry a research-oriented perspective on qualification-related component performance, as well as refinements to component testing standards which are based upon actual component testing research

  5. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  6. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  7. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  8. Comparison of extracorporeal shock wave lithotripsy running models between outsourcing cooperation and rental cooperation conducted in Taiwan.

    Science.gov (United States)

    Liu, Chih-Kuang; Ko, Ming-Chung; Chen, Shiou-Sheng; Lee, Wen-Kai; Shia, Ben-Chang; Chiang, Han-Sun

    2015-02-01

    We conducted a retrospective study to compare the cost and effectiveness between two different running models for extracorporeal shock wave lithotripsy (SWL), including the outsourcing cooperation model (OC) and the rental cooperation model (RC). Between January 1999 and December 2005, we implemented OC for the SWL, and from January 2006 to October 2011, RC was utilized. With OC, the cooperative company provided a machine and shared a variable payment with the hospital, according to treatment sessions. With RC, the cooperative company provided a machine and received a fixed rent from the hospital. We calculated the cost of each treatment session, and evaluated the break-even point to estimate the lowest number of treatment sessions to make the balance between revenue and cost every month. Effectiveness parameters, including the stone-free rate, the retreatment rate, the rate of additional procedures and complications, were evaluated. Compared with OC there were significantly less treatment sessions for RC every month (42.6±7.8 vs. 36.8±6.5, p=0.01). The cost of each treatment session was significantly higher for OC than for RC (751.6±20.0 USD vs. 684.7±16.7 USD, p=0.01). The break-even point for the hospital was 27.5 treatment sessions/month for OC, when the hospital obtained 40% of the payment, and it could be reduced if the hospital got a greater percentage. The break-even point for the hospital was 27.3 treatment sessions/month for RC. No significant differences were noticed for the stone-free rate, the retreatment rate, the rate of additional procedures and complications. Our study revealed that RC had a lower cost for every treatment session, and fewer treatment sessions of SWL/month than OC. The study might provide a managerial implication for healthcare organization managers, when they face a situation of high price equipment investment. Copyright © 2012. Published by Elsevier B.V.

  9. Radiation protection calculations for diagnostic medical equipment

    International Nuclear Information System (INIS)

    Klueter, R.

    1992-01-01

    The standards DIN 6812 and DIN 6844 define the radiation protection requirements to be met by biomedical radiography equipment or systems for nuclear medicine. The paper explains the use of a specific computer program for radiation protection calculations. The program offers menu-controlled calculation, with free choice of the relevant nuclides. (DG) [de

  10. A Failing Grade for WEEE Take-Back Programs for Information Technology Equipment

    Science.gov (United States)

    Nakajima, Nina; Vanderburg, Willem H.

    2005-01-01

    Product take-back (also called extended producer responsibility) has become a trend for dealing with the garbage resulting from categories of problematic products. Waste electrical and electronic equipment (WEEE) is one such category with computer equipment being of particular significance. This article provides a description of the European…

  11. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  12. Program outline of seismic fragility capacity tests on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Lijima, T.; Abe, H.; Fujita, T.

    2004-01-01

    A seismic probabilistic safety assessment (PSA) is an available method to evaluate residual risk of nuclear plant that is designed with definitive seismic design condition. Seismic fragility capacity data are necessary for seismic PSA, but we don't have sufficient data of active components of nuclear plants in Japan. This paper describes a plan of seismic fragility capacity tests on nuclear power plant equipment. The purpose of those tests is to obtain seismic fragility capacity of important equipment from a safety design point of view. And the equipment for the fragility capacity tests were selected considering effect on core damage frequency (CDF) that was evaluated by our preliminary seismic PSA. Consequently horizontal shaft pump, electric cabinets, Control Rod Drive system (CRD system) of BWR and PWR plant and vertical shaft pump were selected. The seismic fragility capacity tests are conducted from phase-1 to phase-3, and horizontal shaft pump and electric cabinets are tested on phase-1. The fragility capacity test consists of two types of tests. One is actual equipment test and another is element test. On actual equipment test, a real size model is tested with high-level seismic motion, and critical acceleration and failure mode are investigated. Regarding fragility test phase-1, we selected typical type horizontal shaft pump and electric cabinets for the actual equipment test. Those were Reactor Building Closed Cooling Water (RCW) Pump and eight kinds of electric cabinets such as relay cabinet, motor control center. On the test phase-1, maximum input acceleration for the actual equipment test is intended to be 6-G-force. Since the shaking table of TADOTSU facility did not have capability for high acceleration, we made vibration amplifying system. In this system, amplifying device is mounted on original shaking table and it moves in synchronization with original table. The element test is conducted with many samples and critical acceleration, median and

  13. Alternative Fuel and Advanced Technology Commercial Lawn Equipment (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-10-01

    The U.S. Department of Energy's Clean Cities program produced this guide to help inform the commercial mowing industry about product options and potential benefits. This guide provides information about equipment powered by propane, ethanol, compressed natural gas, biodiesel, and electricity, as well as advanced engine technology. In addition to providing an overview for organizations considering alternative fuel lawn equipment, this guide may also be helpful for organizations that want to consider using additional alternative fueled equipment.

  14. Chemical decontamination solutions: Effects on PWR equipment

    International Nuclear Information System (INIS)

    Pezze, C.M.; Colvin, E.R.; Aspden, R.G.

    1992-01-01

    A critical objective for the nuclear industry is the reduction of personnel exposure to radiation. Reductions have been achieved through industry's radiation management programs including training and radiation awareness concepts. Increased plant maintenance and higher radiation fields at many sites continue to raise concerns. To alleviate the radiation exposure problem, the sources of radiation which contribute to personnel exposure must be removed from the plant. A feasible was of significantly reducing these sources from a Pressurized Water Reactor (PWR) is to chemically decontaminate the entire reactor coolant system (RCS). A program was conducted to determine the technical acceptability of using certain dilute chemical solvent processes for full RCS chemical decontamination. The two processes evaluated were CAN-DEREM and LOMI. The purpose of the program was to define and complete a systematic evaluation of the major issues that need to be addressed for the successful decontamination of the entire RCS and affected portions of the auxiliary systems of a four-loop PWR system. A test program was designed to evaluate the corrosion effects of the two decontamination processes under expected plant conditions. Materials and sample configurations dictated by generic PWR components were evaluated. The testing also included many standard corrosion coupons. The test data were then used to assess the impact of chemical decontamination on the physical condition and operability of the components, equipment and mechanical systems that make up the RCS. An overview of the test program, sample configurations, data and engineering evaluations is presented. The data demonstrate that through detailed engineering evaluations of corrosion data and equipment function, the impact of full RCS chemical decontamination on plant equipment is established

  15. BWR Services maintenance training program

    International Nuclear Information System (INIS)

    Cox, J.H.; Chittenden, W.F.

    1979-01-01

    BWR Services has implemented a five-phase program to increase plant availability and capacity factor in operating BWR's. One phase of this program is establishing a maintenance training program on NSSS equipment; the scope encompasses maintenance on both mechanical equipment and electrical control and instrumentation equipment. The program utilizes actual product line equipment for practical Hands-on training. A total of 23 formal courses will be in place by the end of 1979. The General Electric Company is making a multimillion dollar investment in facilities to support this training. These facilities are described

  16. ENERGY STAR Certified Electric Vehicle Supply Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are...

  17. Development of a sludge lancing equipment and FOSAR technology

    International Nuclear Information System (INIS)

    Jeong, W. T.; Choi, Y. S.; Son, S. Y.; Hong, S. Y.

    2003-01-01

    A program for developing steam generator lancing equipment was started in 1999 on the request of the Chemistry Division of KHNP of Kori NPP No.1. Based on the program, KALANS r -I lancing system was developed firstly in Korea. Lancing equipments for Ulchin NPP No.2(KSNP) and Youngkwang NPP No.1 have been being developed since 2001. A project for developing FOSAR(Foreign Object Search and Retrieval) equipment has been being developed since 2001. The FOSAR equipment is going to automate the search and retrieval operation which has been manual, thus minimizes radiation exposure and improves the performance of inspection work. Besides, a research to evaluate the feasibility of an ultrasonic cleaning method is also under consideration. A project to develop an Upper Bundle Hydraulic Cleaning (UBHC) system was started on May 2003. In this paper, a steam generator lancing system for Kori NPP No.1 is presented. A research activities for developing FOSAR(Foreign Object Search and Retrieval) system, UBHC(Upper Bundle Hydraulic Cleaning) system, and ultrasonic cleaning system are also presented briefly

  18. 40 CFR 1054.625 - What requirements apply under the Transition Program for Equipment Manufacturers?

    Science.gov (United States)

    2010-07-01

    ... manufacturers to produce equipment with Class II engines that are subject to less stringent exhaust emission... equipment with Class II engines exempted under this section. You may use the exemptions in this section only... by determining your U.S.-directed production volume of equipment with Class II engines from January 1...

  19. Assessment of the causes of failures of roto-dynamic equipment in Cirus

    International Nuclear Information System (INIS)

    Rao, K.N.; Singh, S.; Ganeshan, P.

    1994-01-01

    As a part of Cirus reactor life extension program study, a service life evaluation of critical roto-dynamic equipment in Cirus such as primary coolant pumps, and their concrete foundation structures, pressurised water loop pumps, main air compressors and supply and exhaust fans, was performed. An assessment of the causes of failures of roto-dynamic equipment in Cirus was done. Based on assessment of the degradation mitigating features and comparison to similar roto-dynamic equipment and their concrete foundation structures, it was concluded that life extension of these roto-dynamic equipment and their structures is feasible. To support this conclusion a program involving: a) non-destructive testing, b) surveillance and monitoring and, c) preventive maintenance is recommended. (author). 4 refs

  20. Port Hope and area property value protection program: creating stability in the marketplace

    International Nuclear Information System (INIS)

    Gerestein, B.; Flynn, B.

    2006-01-01

    The Property Value Protection (PVP) Program, administered by the Low-Level Radioactive Waste Management Office (LLRWMO), functions as an integral part of the Port Hope Area Initiative, a $260M, 10-year project to clean up and safely manage low- level radioactive waste for the long-term in the Port Hope area. The PVP Program was established in March 2001 to compensate owners of residential, commercial or industrial properties in designated parts of the municipalities of Port Hope and Clarington. Compensation is awarded to owners if they realize financial loss on the sale or rental of their property or mortgage renewal difficulties as a result of the Initiative. Key features of the PVP Program include a claim process, an appeal process and the appointment of independent Compensation Officers to hear appeals. (author)

  1. Preliminary evaluation of operational parameters in fixed x-ray diagnostics equipment

    International Nuclear Information System (INIS)

    Bacelar, Alexandre; Oliveira, Sandro Soletti de; Streck, Elaine E.; Furtado, Alvaro Porto Alegre; Pinto, Ana Lucia Acosta

    1998-01-01

    In this work they were appraised 22 fixed X-ray diagnostic equipment belonging to three great medical institutions in Porto Alegre - RS, Brazil, with the purpose of demonstrating the importance of the implementation of a Quality Warranty program, advised by a health physicist, in the performance of these equipment. For so some data of alignment and collimation of the beam, peak tube voltage, tube current, transportable charge and exposition time were collected. The results of the tests showed that in only one of the institutions all the equipment remained in operationally acceptable conditions, with relative percent errors below 10%, concerning to the analyzed parameters. This study also showed that the performance of the equipment of the three analyzed institutions is a direct reflex of the maintenance of a Quality Warranty Program, advised by a qualified professional. (author)

  2. Using GIS to enhance programs serving emancipated youth leaving foster care.

    Science.gov (United States)

    Batsche, Catherine J; Reader, Steven

    2012-02-01

    This article describes a GIS prototype designed to assist with the identification and evaluation of housing that is affordable, safe, and effective in supporting the educational goals and parental status of youth transitioning from foster care following emancipation. Spatial analysis was used to identify rental properties based on three inclusion criteria (affordability, proximity to public transportation, and proximity to grocery stores), three exclusion criteria (areas of high crime, prostitution, and sexual predator residence), and three suitability criteria (proximity to health care, mental health care, and youth serving organizations). The results were applied to four different scenarios to test the utility of the model. Of the 145 affordable rental properties, 27 met the criteria for safe and effective housing. Of these, 19 were located near bus routes with direct service to post-secondary education or vocational training programs. Only 6 were considered appropriate to meet the needs of youth who had children of their own. These outcomes highlight the complexities faced by youth when they attempt to find affordable and suitable housing following emancipation. The LEASE prototype demonstrates that spatial analysis can be a useful tool to assist with planning services for youth making the transition to independent living. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  4. Preserving EQ as per CSA N290.13: EQ of equipment for CANDU NPP

    International Nuclear Information System (INIS)

    Bordeleau, H.

    2006-01-01

    EQ is basically a Quality Assurance process that ensures that required safety related equipment will performed their safety functions during accident generating harsh environmental condition. As any good Quality Assurance Program, EQ activities have to be imbedded in the normal tasks of the people at the plant in such a way that it is not an extra concern but part of the things to be assessed and done on a regular basis so that the EQ Status of the equipment will not be compromised. The experience shows us that even with brand new plants there are discrepancies between equipment designed to be installed and that installed (wrong model or wrong instrument). Improper installation was also found. To eliminate these mistakes it is recommended to have a thorough initial inspection during construction or commissioning and later at regular intervals during operation. To avoid new mistakes during maintenance, crews have to be properly qualified and trained on completed procedure with appropriate work report that will required to be scrutinized for possible common cause failure and OPEX report. Procurement and handling of equipment and spare parts require a thorough revision of procurement and storage practices to guarantee proper storage, availability and identification of equipment for EQ replacement. A shelf life program for degradable material shall be implemented. Condition monitoring program could be use to extend life of equipment or as a qualification methods, caution should be use to look very precisely to the critical parameters that need to be monitored and to carefully tailor the monitoring program. EQ program should also consider barriers, they are not EQ equipment; it is usually made out of non-ageing material like metal or concrete. But there could be sealing material used in conjunction with the barriers and these may need special care. The impact of EQ parameters changes related to services conditions, new technical data or condition monitoring has to be

  5. Protocol for disposition of tank farm equipment lists and tank farm drawings for year 2000 compliance

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been initiated to assess, renovate, document and certify tank farm field equipment for year 2000 compliance. The program is necessary to assure no adverse effects occur in tank farm operations as a result of equipment malfunction due to what is widely known as the ''millennium bug''. This document elaborates the protocols for reviewing field equipment lists and tank farm drawings for the purpose of identifying and resolving year 2000 compliance problems in tank farm equipment

  6. Power levels in office equipment: Measurements of new monitors and personal computers

    International Nuclear Information System (INIS)

    Roberson, Judy A.; Brown, Richard E.; Nordman, Bruce; Webber, Carrie A.; Homan, Gregory H.; Mahajan, Akshay; McWhinney, Marla; Koomey, Jonathan G.

    2002-01-01

    Electronic office equipment has proliferated rapidly over the last twenty years and is projected to continue growing in the future. Efforts to reduce the growth in office equipment energy use have focused on power management to reduce power consumption of electronic devices when not being used for their primary purpose. The EPA ENERGY STAR[registered trademark] program has been instrumental in gaining widespread support for power management in office equipment, and accurate information about the energy used by office equipment in all power levels is important to improving program design and evaluation. This paper presents the results of a field study conducted during 2001 to measure the power levels of new monitors and personal computers. We measured off, on, and low-power levels in about 60 units manufactured since July 2000. The paper summarizes power data collected, explores differences within the sample (e.g., between CRT and LCD monitors), and discusses some issues that arise in m etering office equipment. We also present conclusions to help improve the success of future power management programs.Our findings include a trend among monitor manufacturers to provide a single very low low-power level, and the need to standardize methods for measuring monitor on power, to more accurately estimate the annual energy consumption of office equipment, as well as actual and potential energy savings from power management

  7. Decommissioning of Division of Military Application equipment at Hanford. Summary report

    International Nuclear Information System (INIS)

    Raile, M.N.

    1977-06-01

    This report describes the successful decommissioning of plutonium-contaminated equipment used for weapon component fabrication and inspection at the Hanford Plant. Special materials, techniques, and equipment were employed during the course of the decommissioning program. Most significant was the development and design of large, double-wall fiberglassed plywood boxes for long-term (20-years, minimum) retrievable storage of the contaminated equipment in underground transuranic waste trenches

  8. Economic Analysis for Setting Appropriate Repair Cycles on the Fixed Materials and Facilities in the Public Rental Housing

    Directory of Open Access Journals (Sweden)

    Sung-Min Choi

    2016-01-01

    Full Text Available Currently, repair and maintenance cycles that follow the completion of construction facilities lead to the necessitation of subsequent data on the analysis of study and plan for maintenance. As such, an index of evaluation was drafted and a plan of maintenance cycle was computed using the investigation data derived from surveying target housing units in permanent rental environmental conditions, with a minimum age of 20 years, and their maintenance history. Optimal maintenance and replacement methods were proposed based on this data. Economic analysis was conducted through the Risk-Weighted Life Cycle Cost (RWLCC method in order to determine the cost analysis of maintenance life cycle methods used for repair. Current maintenance cycle methods that have been used for 20 years were also compared with alternative maintenance cycles.

  9. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  10. 77 FR 43535 - Grantee Codes for Certified Radiofrequency Equipment

    Science.gov (United States)

    2012-07-25

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 2 [FCC 12-60] Grantee Codes for Certified Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY: This document... authorization program for radiofrequency (RF) devices under part 2 of its rules. This program is one of the...

  11. Data-Driven Scenario Generation for Enhanced Realism of Equipment Training Simulators

    NARCIS (Netherlands)

    Vahdatikhaki, Faridaddin; Hammad, Amin; olde Scholtenhuis, Léon Luc; Miller, Seirgei Rosario; Makarov, Denis

    2017-01-01

    Improving the training of heavy equipment operators can make a significant contribution to improving the safety of construction sites. In recent years, Virtual Reality (VR)-based simulators have gained increased popularity for the use in equipment training programs. While VR training simulators for

  12. Testing of FFTF fuel handling equipment

    International Nuclear Information System (INIS)

    Coleman, D.W.; Grazzini, E.D.; Hill, L.F.

    1977-07-01

    The Fast Flux Test Facility has several manual/computer controlled fuel handling machines which are exposed to severe environments during plant operation but still must operate reliably when called upon for reactor refueling. The test programs for two such machines--the Closed Loop Ex-Vessel Machine and the In-Vessel Handling Machine--are described. The discussion centers on those areas where design corrections or equipment repairs substantiated the benefits of a test program prior to plant operation

  13. Characteristics and application study of AP1000 NPPs equipment reliability classification method

    International Nuclear Information System (INIS)

    Guan Gao

    2013-01-01

    AP1000 nuclear power plant applies an integrated approach to establish equipment reliability classification, which includes probabilistic risk assessment technique, maintenance rule administrative, power production reliability classification and functional equipment group bounding method, and eventually classify equipment reliability into 4 levels. This classification process and result are very different from classical RCM and streamlined RCM. It studied the characteristic of AP1000 equipment reliability classification approach, considered that equipment reliability classification should effectively support maintenance strategy development and work process control, recommended to use a combined RCM method to establish the future equipment reliability program of AP1000 nuclear power plants. (authors)

  14. Make or Buy: A Systematic Approach to Department of Defense Sourcing Decisions

    Science.gov (United States)

    2013-07-30

    law (31 U.S.C. 1104(b)). OMB Circular A-11 lays out five broad object classes:  10 – Personal compensation and benefits  20 – Contractual services ...Rental payments to others (land/structures) Overhead Information Technology 2331 Telephone Services and Equipment 23.3 Communications ...Equipment Overhead Information Technology 252G Audiovisual Production and Services . 25.2 Other Services Overhead Information Technology 252H

  15. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  16. Development and Manufacture of the Nuclear Laboratory Equipment

    International Nuclear Information System (INIS)

    Youm, Ki Un; Kim, J. K.; Kim, K. S.; Lee, I. B.; Youm, J. H.; Park, I. W.

    2008-12-01

    This report on development and manufacture of the nuclear laboratory equipment contains the work scope and contents performed for supporting the researches and the developments projects efficiently. And also, the records for the principal production design, the manufacture contents, the working drawings and the CNC program are described in it. Most of works are to support the successful and convenient performance of the R and D projects by development and manufacturing the requested laboratory equipment

  17. Development and Manufacture of the Nuclear Laboratory Equipment

    International Nuclear Information System (INIS)

    Youm, Ki Un; Moon, J. S.; Lee, I. B.; Youn, J. H.

    2010-12-01

    This report on development and manufacture of the nuclear laboratory equipment contains the work scope and contents performed for supporting the researches and the developments projects efficiently. And also, the records for the principal production design, the manufacture contents, the working drawings and the CNC program are described in it. Most of works are to support the successful and convenient performance of the R and D projects by development and manufacturing the requested laboratory equipment

  18. Development and Manufacture of the Nuclear laboratory equipment

    International Nuclear Information System (INIS)

    Youm, Ki Un; Lee, I. B.; Youm, J. H.

    2009-12-01

    This report on development and manufacture of the nuclear laboratory equipment contains the work scope and contents performed for supporting the researches and the developments projects efficiently. And also, the records for the principal production design, the manufacture contents, the working drawings and the CNC program are described in it. Most of works are to support the successful and convenient performance of the R and D projects by development and manufacturing the requested laboratory equipment

  19. Evaluation of Storage for Transportation Equipment, Unfueled Convertors, and Fueled Convertors at the INL for the Radioisotope Power Systems Program

    Energy Technology Data Exchange (ETDEWEB)

    S. G. Johnson; K. L. Lively

    2010-05-01

    This report contains an evaluation of the storage conditions required for several key components and/or systems of the Radioisotope Power Systems (RPS) Program at the Idaho National Laboratory (INL). These components/systems (transportation equipment, i.e., type ‘B’ shipping casks and the radioisotope thermo-electric generator transportation systems (RTGTS), the unfueled convertors, i.e., multi-hundred watt (MHW) and general purpose heat source (GPHS) RTGs, and fueled convertors of several types) are currently stored in several facilities at the Materials and Fuels Complex (MFC) site. For various reasons related to competing missions, inherent growth of the RPS mission at the INL and enhanced efficiency, it is necessary to evaluate their current storage situation and recommend the approach that should be pursued going forward for storage of these vital RPS components and systems. The reasons that drive this evaluation include, but are not limited to the following: 1) conflict with other missions at the INL of higher priority, 2) increasing demands from the INL RPS Program that exceed the physical capacity of the current storage areas and 3) the ability to enhance our current capability to care for our equipment, decrease maintenance costs and increase the readiness posture of the systems.

  20. Pilot program of quality control in mammography and conventional equipment in the Antioquia Department

    International Nuclear Information System (INIS)

    Martinez, P.; Puerta, J.A.; Morales, J.; Beltran, C.C.

    2006-01-01

    The Sectional Health Division of Antioquia and the National University of Colombia- Medellin Headquarters formalized an agreement for the realization of the quality control of thirty mammographs and twenty-five conventional X-ray equipment located in the one metropolitan area of Medellin, and ten municipalities of the nine regions in that the antioquen county is divided. The National University of Colombia- Headquarters Medellin possesses a program for the formation in quality control and radiological protection at master level in physics for that which endowed a radiodiagnostic laboratory for these purposes. In the Antioquia department only exists an institution, the San Vicente of Paul University Hospital that possesses a quality control program in radiodiagnostic; this hospital given its great volume of studies in radiodiagnostic has a medical physicist and of that instrumental necessary to maintain the program. The quality control programs have not been implemented in the rest of health institutions, public or private, big or small, until the moment. The project then allowed to carry out an initial evaluation of the pertinent parameters of the quality control of the facilities like its are those that refer to the state of the x-ray generator, the disposition of the installation, the dark room, the film processor and negatoscopies room; these its were carried out with base in the protocol produced in the ARCAL XLIX project in which participated six Latin American countries. The dose average in mammography, following the proposed course in the ARCAL LXXV, where its participate eleven Latin American countries was also evaluated. This study pilot serves like reference of the current state of the regional radiodiagnostic services, with base in this sampling that is representative. The obtained data gave the necessary information so that the Sectional Division of Health of Antioquia can generate tending actions to the implementation of quality guarantee programs and

  1. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  2. Outdoor Power Equipment Technician: Apprenticeship Course Outline. Apprenticeship and Industry Training. 5111.1

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2011

    2011-01-01

    The graduate of the Outdoor Power Equipment Technician apprenticeship program is a certified journeyperson who will be able to: (1) supervise, train and coach apprentices; (2) service, maintain, repair and rebuild outdoor power equipment and outdoor power equipment accessories; (3) communicate clearly with customers, staff, suppliers, as required;…

  3. Impact of pre-conditioning on the qualification of safety-related equipment

    International Nuclear Information System (INIS)

    Isgro, J.R.

    1982-01-01

    This paper shares some recent experiences on the effects of preconditioning on the qualification of safety-related equipment not located in a harsh environment. Environmental and seismic qualification testing programs were conducted following the guidelines of IEEE 323-1974, IEEE 344-1975 and appropriate IEEE daughter standards, where available. The examples that follow will illustrate the degree of pre-conditioning of safety-related equipment qualified to the requirements of IEEE-323-1974, and its effect on the outcome of the qualification program

  4. Small Portable Analyzer Diagnostic Equipment (SPADE) Program -- Diagnostic Software Validation

    Science.gov (United States)

    1984-07-01

    Electronic Equipment Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference Electromagnetic...ONLY. ORIENTATION OF DEFECT LOOKING HHO QIlILL: t -ed’-o· Significant efforts were expended to simulate spalling failures associated with naturally

  5. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  6. Reliability and maintainability data acquisition in equipment development tests

    International Nuclear Information System (INIS)

    Haire, M.J.; Gift, E.H.

    1983-10-01

    The need for collection of reliability, maintainability, and availability data adds a new dimension to the data acquisition requirements of equipment development tests. This report describes the reliability and maintainability data that are considered necessary to ensure that sufficient and high quality data exist for a comprehensive, quantitative evaluation of equipment and system availability. These necessary data are presented as a set of data collection forms. Three data acquisition forms are discussed: an inventory and technical data form, which is filed by the design engineer when the design is finished or the equipment is received; an event report form, which is completed by the senior test operator at each shutdown; and a maintainability report, which is a collaborative effort between senior operators and lead engineers and is completed on restart. In addition, elements of a reliability, maintainability evaluation program are described. Emphasis is placed on the role of data, its storage, and use in such a program

  7. 77 FR 76972 - Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment...

    Science.gov (United States)

    2012-12-31

    ... motors and pumps and certain other industrial equipment to conserve the energy resources of the nation... the efficiency of electric motors, pumps and certain other industrial equipment to conserve the energy... electric motors as covered equipment. A compressor may have some or all of the following components: piston...

  8. Risk aversion and willingness to pay for energy efficient systems in rental apartments

    Energy Technology Data Exchange (ETDEWEB)

    Farsi, Mehdi [Centre for Energy Policy and Economics, ETH Zurich, Zuerichbergstr. 18, Zurich 8032 (Switzerland)

    2010-06-15

    This paper uses a random utility model to estimate consumers' valuation of energy efficient insulation and ventilation systems in rental apartments. Given consumers' limited experience in residential buildings and the perceived uncertainty about their comfort benefits and resulting energy savings, these relatively new technologies might be undervalued by risk-averse consumers. Using the concept of certainty-equivalence, this paper proposes a model to assess the consumers' risk-aversion for adopting energy-efficient systems. These systems are treated as risky assets while conventional commodities are assumed to be risk-free. The curvature of the utility function is interpreted as a measure of aversion to perceived risks as opposed to explicit risks measured by observed variances. The proposed formulation is applicable in stated preference data with qualitative variables. The model is applied to data from a choice experiment conducted among 264 apartment tenants in Switzerland. The estimated curvatures reject the risk-neutrality hypothesis. The range of the estimated risk premiums suggests that risk considerations remain a central issue in dealing with energy efficiency in residential buildings. The analysis also indicates that assuming same risk attitudes toward new and conventional systems could bias the estimates of the willingness to pay, especially when the system is comprised of several components. (author)

  9. Risk aversion and willingness to pay for energy efficient systems in rental apartments

    International Nuclear Information System (INIS)

    Farsi, Mehdi

    2010-01-01

    This paper uses a random utility model to estimate consumers' valuation of energy efficient insulation and ventilation systems in rental apartments. Given consumers' limited experience in residential buildings and the perceived uncertainty about their comfort benefits and resulting energy savings, these relatively new technologies might be undervalued by risk-averse consumers. Using the concept of certainty-equivalence, this paper proposes a model to assess the consumers' risk-aversion for adopting energy-efficient systems. These systems are treated as risky assets while conventional commodities are assumed to be risk-free. The curvature of the utility function is interpreted as a measure of aversion to perceived risks as opposed to explicit risks measured by observed variances. The proposed formulation is applicable in stated preference data with qualitative variables. The model is applied to data from a choice experiment conducted among 264 apartment tenants in Switzerland. The estimated curvatures reject the risk-neutrality hypothesis. The range of the estimated risk premiums suggests that risk considerations remain a central issue in dealing with energy efficiency in residential buildings. The analysis also indicates that assuming same risk attitudes toward new and conventional systems could bias the estimates of the willingness to pay, especially when the system is comprised of several components.

  10. Comparison between two models of elbow rehabilitation equipment

    Directory of Open Access Journals (Sweden)

    Vetrice Georgiana

    2017-01-01

    Full Text Available International studies have revealed that using continuous passive motion (CPM equipment as part of a rehabilitation program improves the recovery period and also diminishes the rehabilitation costs by about 50%. This explains the need for conceiving elbow joint rehabilitation equipment to help persons suffering from posttraumatic disabilities. In order to create the best model to meet the patients’ requirements this paper presents two constructive solutions of such equipment and a comparison between their designs. Both achieve the desired movements of the elbow joint: flexion-extension and pronation-supination and are actuated by pneumatic muscles, due to the multiple advantages of pneumatic actuation: low cost, compliance and favorable response to commands.

  11. Calibration of laboratory equipment and its intermediate verification

    International Nuclear Information System (INIS)

    Remedi, Jorge O.

    2011-01-01

    When a laboratory wants to prove that he has technical competence to carry out tests or calibrations must demonstrate that it has complied with certain requirements that establish , among others, the mandatory : calibrate or verify equipment before putting it into service in order to ensure that it meets to the specifications of laboratory equipment to keep records evidencing the checks that equipment complies with the specification ; perform intermediate checks for maintain confidence in the calibration status of the equipment , ensure that the operation is checked and calibration status of equipment when the equipment goes outside the direct control of the laboratory , before be returned to service, establish a program and procedure for the calibration of equipment; show how determined the calibration periods of their equipment as well as evidence that intermediate checks are suitable for the calibration periods. However, some confusion is observed as to the meaning of the terms 'calibration' and 'verification' of a computer. This paper analyzes applicable documentation and suggests that the differences are generated in part by translations and by characterization concepts upon its usage, that is, if it is legal metrology or assessment conformity. Therefore, this study aims to characterize both concepts , fundamentals to zoom distinguish , outline appropriate strategies for calibration and verification activities to ensure the compliance with regulatory requirements [es

  12. 40 CFR 82.162 - Certification by owners of recovery and recycling equipment.

    Science.gov (United States)

    2010-07-01

    ... and recycling equipment. 82.162 Section 82.162 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling and Emissions Reduction § 82.162 Certification by owners of recovery and recycling equipment. (a) No later than August 12...

  13. 14 CFR 91.503 - Flying equipment and operating information.

    Science.gov (United States)

    2010-01-01

    ... Turbine-Powered Multiengine Airplanes and Fractional Ownership Program Aircraft § 91.503 Flying equipment...) Emergency operation of fuel, hydraulic, electrical, and mechanical systems. (2) Emergency operation of...

  14. Management of radiodiagnostic equipment: Implementation of self-maintenance project of the conventional x-ray equipment of Hospital Universitario Clementino Fraga Filho - HUCFF-UFRJ

    International Nuclear Information System (INIS)

    Couto, N.F. do; Azevedo, A.C.P.; Koch, H.A.

    2001-01-01

    The project aims the implantation of a management program, for the maintenance of the conventional X-ray equipment at HUCFF. It has been implemented through the training of the electronic technicians who work at the Hospital. Essential courses were organized such as: Basics of Radioprotection, Radiographs Techniques, and Maintenance of equipment of X-Rays. Equipment: a library with the schemes of the equipment is being assembled in collaboration with UNICAMP. In order to manage the process, a software was created using the tools of the total quality for control of the maintenance. Preliminary tests: the equipment and their working conditions were evaluated, as well as the level of the employees' satisfaction with their use. The creation of a new routine for maintenance seeks to assist the demands of the new legislation in Brazil 5, and also reduce the costs to improve the quality of the images in the Radiodiagnostic Service. (author)

  15. Improvements in remote equipment torquing and fastening

    International Nuclear Information System (INIS)

    Garin, J.

    1978-01-01

    Remote torquing and fastening is a requirement of generic interest for application in an environment not readily accessible to man. The developments over the last 30 years in torque-controlled equipment above 200 nm (150 ft/lb) have not been emphasized. The development of specialized subassemblies to torque and fasten equipment in a remotely controlled environment is an integral part of the Advanced Fuel Recycle Program at Oak Ridge National Laboratory. Commercially available subassemblies have been adapted into a system that would provide remote torquing and fastening in the range of 200 to 750 nm (150 to 550 ft/lb). 9 figures

  16. 78 FR 53423 - Section 538 Guaranteed Rural Rental Housing Program for Fiscal Year 2013

    Science.gov (United States)

    2013-08-29

    ... 3560.406) of existing direct Section 515 and Section 514/516 Farm Labor Housing (FLH) (transfer costs... is taken to extend the eligible properties to include Rural Development financed Farm Labor Housing...) program. Equity payment, as stipulated in 7 CFR 3560.406, in the transfer of existing direct Section 515...

  17. FY 2000 Research and development of technology for medical and welfare equipment. Report on the comprehensive survey on welfare equipment; 2000 nendo iryo fukushi kiki gijutsu kenkyu kaihatsu chosa hokokusho. Fukushi kiki sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The survey is conducted on the advanced basic and application technologies for medical and welfare equipment, e.g., biotechnology and drug delivery systems, to promote development of these technologies. For development of the gene-aided diagnostic system equipment for clinical purposes, surveys are conducted on current medical equipment and related technologies, and the results are summarized and pigeonholed for each equipment type. Also summarized are the small- to medium-sized enterprises which are considered to have techniques needed for development of sensors for heart disease treatment systems. For usability of welfare-related equipment products, investigations are made viewed from the designs oriented to human adaptability, human adaptable designs in the aging societies, and welfare-related problems in the aging societies and usability. The latest information on leading organizations and researchers is collected, for continuation and development of the usability programs for welfare-related equipment products, and also for inviting the current related technologies and researchers on life supporting for the aged in Japan to the programs. (NEDO)

  18. Remote handling equipment design for the HEDL fuel supply program

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1984-09-01

    A process line is currently being developed for fabrication of high exposure mixed uranium-plutonium core assemblies. This paper describes the design philosophy, process flow, equipment, and the handling and radiation shielding techniques used for inspection of Fast Flux Test Facility (FFTF) fuel pins and assembly of Driver Fuel Assemblies (DFAs) 6 figures

  19. Heavy Equipment Technician: Apprenticeship Course Outline. Apprenticeship and Industry Training. 1912

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2012

    2012-01-01

    The graduate of the Heavy Equipment Technician apprenticeship program is a certified journeyperson who will be able to: (1) diagnose repair, and maintain by skills and knowledge gained through training and experience any of the working parts of diesel engines as well as the various components of mobile industrial equipment; (2) use, competently,…

  20. Dispensing Equipment Testing with Mid-Level Ethanol/Gasoline Test Fluid: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Boyce, K.; Chapin, J. T.

    2010-11-01

    The National Renewable Energy Laboratory's (NREL) Nonpetroleum-Based Fuel Task addresses the hurdles to commercialization of biomass-derived fuels and fuel blends. One such hurdle is the unknown compatibility of new fuels with current infrastructure, such as the equipment used at service stations to dispense fuel into automobiles. The U.S. Department of Energy's (DOE) Vehicle Technology Program and the Biomass Program have engaged in a joint project to evaluate the potential for blending ethanol into gasoline at levels higher than nominal 10 volume percent. This project was established to help DOE and NREL better understand any potentially adverse impacts caused by a lack of knowledge about the compatibility of the dispensing equipment with ethanol blends higher than what the equipment was designed to dispense. This report provides data about the impact of introducing a gasoline with a higher volumetric ethanol content into service station dispensing equipment from a safety and a performance perspective.

  1. Restoration to serviceability of Bruce 'A' heat transfer equipment

    International Nuclear Information System (INIS)

    Gammage, D.; Machowski, C.; McGillivray, R.; Durance, D.; Kazimer, D.; Werner, K.

    2009-01-01

    Bruce Units 1 to 4 were shut down during the 1990s by the former Ontario Hydro, due in part to a long list of system and equipment deficiencies and concerns, including steam generator tube degradation as a consequence of the then-existing steam generator secondary side water chemistry conditions. Upon its creation in 2001, and following a program of condition assessment, Bruce Power was able to determine that Units 3 and 4 could return to service; but that Units 1 and 2 would require refurbishment. That Refurbishment Program, which is currently well advanced, included the re-assessment of the condition of equipment throughout the plant including the heat transfer equipment; and determination item-by-item as to what inspection, cleaning, repair, or even replacement would be required to put the equipment into a condition where it could be expected to operate reliably for the additional 30 years expected from the plant. Clearly the objective is to suitably restore the equipment to serviceability without doing more refurbishment work than is warranted - without replacing equipment except where absolutely necessary. The first task in such a program is determination of its scope - i.e. a listing of all heat exchangers. That list included everything from the steam generators (which required replacement, now completed), to much smaller heat exchangers in the heavy water upgrader systems (which were found to be in very good overall condition). There is also a very large number of other so-called 'balance-of-plant' heat exchangers; these include the maintenance coolers, moderator heat exchangers, shutdown coolers and a whole raft of smaller coolers - many of which are cooled directly by lake water with its potential for bio-fouling and 'BIC' (Biologically Induced Corrosion). This paper focuses primarily on the engineering assessment, inspection, repair and general refurbishment of the balance-of-plant heat exchangers. As will be discussed in the paper, the assessment of the

  2. Existe trabalho em equipe no Programa Saúde da Família? Is there teamwork in the Family Health Program?

    Directory of Open Access Journals (Sweden)

    Maria do Carmo Gomes Kell

    2010-06-01

    Full Text Available O objetivo do estudo foi conhecer como se desenvolve o trabalho em equipe no Programa Saúde da Família. Utilizou-se metodologia qualitativa. Foi realizado no Município de Santo Antonio do Descoberto (GO, com quatro equipes básicas completas há mais de seis meses. Foram feitos grupos focais, em duas etapas, a primeira com elementos de cada equipe individualmente e, posteriormente, com integrantes das quatro equipes. Para a análise, empregou-se a técnica de discurso do sujeito coletivo. Evidenciou-se que os sujeitos representam o trabalho em equipe como a união dos integrantes na busca de um objetivo comum, o processo de trabalho ocorre de forma parcelar, pois as funções se realizam de forma isolada ou compartilhada, mas não interativa ou integrada. A ausência de articulação das ações dificulta que as equipes encontrem espaços para a elaboração de projeto assistencial local que atenda as necessidades mais amplas da população.The objective of the study was to know how team work in the Family Health Program is developed. A qualitative methodology was used. The study was performed in the city of Santo Antonio do Descoberto, in the Brazilian state of Goiás, with four complete basic teams more than six months ago. Focal groups had been formed, in two stages: the first with elements of each team individually, and later, with integrants of the four teams. For the analysis it was used the Discourse of the Collective Subject technique. It was evidenced that the subjects represent the team work as the union of the integrant ones in the search of a common objective. The work process occurs in a fragmented way, once the functions are carried in either an isolated or shared form, but not interactive or integrated. The absence of articulation of the actions becomes difficult that the teams find spaces for the elaboration of a local assistance project that meet the most ample needs of the population.

  3. 34 CFR 76.661 - Equipment and supplies.

    Science.gov (United States)

    2010-07-01

    ... by the State and Its Subgrantees? Participation of Students Enrolled in Private Schools § 76.661... continuing administrative control of all equipment and supplies that the subgrantee acquires with program... in a private school for the period of time needed for the project. (c) The subgrantee shall insure...

  4. Laser alignment of rotating equipment at PNL

    International Nuclear Information System (INIS)

    Berndt, R.H.

    1994-05-01

    Lateral vibration in direct-drive equipment is usually caused by misalignment. Over the years, because of the need to improve on techniques and ways of working more efficiently, various types of alignment methods have evolved. In the beginning, craftsmen used a straight-edge scale across the coupling with a feeler gauge measuring the misalignment error. This is still preferred today for aligning small couplings. The industry has since decided that alignment of large direct-drive equipment needed a more accurate type of instrumentation. Rim and face is another of the first alignment methods and is used on all sizes of equipment. A disadvantage of the rim and face method is that in most cases the coupling has to be disassembled. This can cause alignment problems when the coupling is reassembled. Also, the rim and face method is not fast enough to work satisfactorily on alignment of thermally hot equipment. Another concern is that the coupling has to be manufactured accurately for correct rim and face readings. Reverse dial alignment is an improvement over the rim and face method, and depending on the operator's experience, this method can be very accurate. A good training program along with field experience will bring the operator to a proper level of proficiency for a successful program. A hand-held computer with reverse dial calculations in memory is a must for job efficiency. An advantage over the rim and face method is that the coupling is not disassembled and remains locked together. Reverse dial instrumentation measures from both shaft center lines, rather than the coupling surface so the machining of the coupling during manufacture is not a major concern

  5. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  6. 78 FR 25627 - Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards for...

    Science.gov (United States)

    2013-05-02

    ... average life of the product in the type (or class) compared to any increase in the price of, or in the... well as the market penetration of such equipment. b. Three-Phase Equipment With an Input Capacity Less... standards. This is done by applying a markup multiplier to the manufacturer's [[Page 25632

  7. Performance evaluation of the quarter-scale Russian retrieval equipment for the removal of hazardous waste

    International Nuclear Information System (INIS)

    Enderlin, C.W.; Mullen, O.D.; Terrones, G.

    1997-09-01

    This report describes the test program for evaluating the Russian Retrieval Equipment fabricated by the Integrated Mining Chemical Company (IMCC) and delivered to the US by Radiochem Services Company (RCSC), both of Russia. The testing and fabrication of this equipment were sponsored by the US Department of Energy (DOE). The tests described in this report were conducted at the Pacific Northwest National Laboratory (PNNL) at the DOE Hanford Site by the Retrieval Process Development and Enhancement (RPD and E) team of the Tank Focus Area program (TFA). Tests were carried out jointly by Russian and US personnel for the purpose of evaluating the Russian Retrieval Equipment for potential deployment within the DOE complex. Section 1.0 of this report presents the objectives and a brief background for the test program. The Russian Equipment is described in Section 2.0. Section 3.0 describes the approach taken for testing the equipment. The results of the tests and an analysis of the data are described in Section 4.0. The results and observations obtained from the tests are discussed in Section 5.0. Recommendations and conclusions are presented in Section 6.0

  8. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  9. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  10. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  11. Instrumentation qualification. Seismic qualification of C-E instrumentation equipment. Part One

    International Nuclear Information System (INIS)

    1977-05-01

    A summary of the C-E seismic qualification program utilized to demonstrate the seismic design adequacy of the instrumentation and control equipment used in C-E supplied Nuclear Steam Supply Systems (NSSS) is presented. The report is divided into two parts. Part One includes the equipment seismic requirements and a description of the qualification methods. Part Two lists the specific equipment by nuclear station in which it is used and the equipment test results are summarized in a standard data sheet format to facilitate review. The seismic requirements are based on individual contract commitments with C-E customers and the NRC Standard Review Plan, Section 3.10 ''Seismic Qualification of Category I Instrumentation and Electrical Equipment.'' Equipment is qualified for use in a seismic environment where damage potential to the equipment is less than or equal to that simulated seismic environment to which it has been qualified. The anticipated Safe Shutdown Earthquake (SSE) environment at the inservice location of equipment should be confirmed by each applicant as not exceeding that to which it is qualified

  12. 28 CFR 90.17 - Matching requirements.

    Science.gov (United States)

    2010-07-01

    ... building in the same locality. The basis for determining the value of personal services, materials..., work space, or the monetary value of time contributed by professional and technical personnel and other... project. The value placed on loaned or donated equipment may not exceed its fair rental value. The value...

  13. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  14. Development of ion/proton beam equipment for industrial uses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Byung Ho; Lee, J. H.; Cho, Y. S.; Joo, P. K.; Kang, S. S.; Song, W. S.; Kim, H. J.; Chang, G. H.; Bang, S. W

    1999-12-01

    KAERI has possessed design and fabrication technologies of various ion sources including Duoplasmatron and DuoPiGatron developed by R and D projects of the long-term nuclear technology development program. In order to industrialize ion beam equipments utilizing these ion sources, a technology transfer project for a technology transfer project for a domestic firm has been performed. Under this project, engineers of the firm have been trained through classroom lectures of ion beam principles and OJT, an ion/proton beam equipment (DEMO equipment) has been designed, assembled and commissioned jointly with the engineers. Quality of the ion sources has been quantified, and technologies for ion beam equipment construction, functional test and application research have been developed. The DEMO equipment, which consists of an ion source, power supplies, vacuum, cooling and target systems, has been fabricated and tested to secure stability and reliability for industrial uses. Various characteristic tests including high voltage insulation, beam extraction, beam current measuring, etc. have been performed. This DEMO can be utilized for ion sources development as well as ion beam process development for various industrial products. Engineers of the firm have been trained for the industrialization of ion beam equipment and joined in beam application technology development to create industrial needs of beam equipment. (author)

  15. Deep Space Network equipment performance, reliability, and operations management information system

    Science.gov (United States)

    Cooper, T.; Lin, J.; Chatillon, M.

    2002-01-01

    The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

  16. Programa Saúde da Família: a experiência de equipe multiprofissional Family Health Program: the experience of a multiprofessional team

    Directory of Open Access Journals (Sweden)

    Elaine Machado de Oliveira

    2006-08-01

    Full Text Available OBJETIVO: O Programa Saúde da Família propõe uma nova dinâmica para estruturação dos serviços de saúde, assim como para a relação com a comunidade e para diversos níveis de assistência. O objetivo do estudo foi analisar o significado da experiência do trabalho em equipe para os profissionais do Programa Saúde da Família. MÉTODOS: O estudo foi realizado no município de Conchas, Estado de São Paulo no ano de 2004. A abordagem utilizada foi qualitativa, na vertente da fenomenologia, buscando a essência da realidade vivenciada por oito profissionais de duas equipes do Programa Saúde da Família. RESULTADOS: Os temas revelaram que o trabalho em equipe se caracteriza por dedicação durante as atividades diárias. É necessário haver interação entre todos os membros para ações integrais, embora haja diferenças de ideologias e condutas entre os profissionais. O contato próximo com as famílias permitiu melhor intervenção nos problemas e o trabalho integrado é fundamental para atuação eficaz e de qualidade. CONCLUSÕES: O fenômeno desvelado engendra nova perspectiva de atuação para os profissionais e possibilita a compreensão do trabalho em equipe multiprofissional.OBJECTIVE: The Family Health Program proposes a new dynamics for the structuring of health service, as well as for its relationship with the community in its different levels of care. The aim of the present study was to analyze the significance of teamwork for professionals working in the Family Health Program. METHODS: The study was carried out in the city of Conchas, Southeastern Brazil, in 2004. We used a qualitative approach based on phenomenology as an attempt to reveal the essence of the reality experienced by eight professionals from two Family Health Program teams. RESULTS: Themes revealed that teamwork is characterized by dedication to daily activities. Interaction among all members is required for integral action, although there are differences in

  17. Criteria for approving equipment for continued operation

    International Nuclear Information System (INIS)

    Narayanan, T.V.

    1993-01-01

    In May 1988, the Pressure Vessel Research Committee (PVRC) of the Welding Research Council (WRC) initiated four projects in support of ASME's efforts to develop Codes and Standards for life prediction and life extension of nuclear and fossil power plant components. These projects are: (1) Criteria for Approving Equipment for Continued Operation (2) Guidelines and Procedures for Evaluating Piping for Continued Operation (3) Nondestructive Evaluation of Material Degradation (4) Operation and Maintenance History and Life Cycle Management. The PVRC awarded a contract to Foster Wheeler Development Corporation to undertake the first of these projects. The specific objective was to develop a program plan that will lead to development of ''Criteria for Approving Equipment for Continued Operation.'' The program is divided into the following four tasks: Task 1: Literature Search; Task 2: Telephone Interview and Consultation; Task 3: Program Plan Development; Task 4: Preparation of a Summary Report. This report is in fulfillment of the above project. As part of this study, the author reviewed about 145 reports, papers and books relating to various aspects of life extension. Various experts were also consulted who are involved in EPRI, NRC, ASME, PVRC, MPC, and utility studies as well as other research projects. The conclusions and recommendations for Code-related activities are summarized

  18. A BENCHMARK PROGRAM FOR EVALUATION OF METHODS FOR COMPUTING SEISMIC RESPONSE OF COUPLED BUILDING-PIPING/EQUIPMENT WITH NON-CLASSICAL DAMPING

    International Nuclear Information System (INIS)

    Xu, J.; Degrassi, G.; Chokshi, N.

    2001-01-01

    Under the auspices of the US Nuclear Regulatory Commission (NRC), Brookhaven National Laboratory (BNL) developed a comprehensive program to evaluate state-of-the-art methods and computer programs for seismic analysis of typical coupled nuclear power plant (NPP) systems with nonclassical damping. In this program, four benchmark models of coupled building-piping/equipment systems with different damping characteristics were analyzed for a suite of earthquakes by program participants applying their uniquely developed methods and computer programs. This paper presents the results of their analyses, and their comparison to the benchmark solutions generated by BNL using time domain direct integration methods. The participant's analysis results established using complex modal time history methods showed good comparison with the BNL solutions, while the analyses produced with either complex-mode response spectrum methods or classical normal-mode response spectrum method, in general, produced more conservative results, when averaged over a suite of earthquakes. However, when coupling due to damping is significant, complex-mode response spectrum methods performed better than the classical normal-mode response spectrum method. Furthermore, as part of the program objectives, a parametric assessment is also presented in this paper, aimed at evaluation of the applicability of various analysis methods to problems with different dynamic characteristics unique to coupled NPP systems. It is believed that the findings and insights learned from this program will be useful in developing new acceptance criteria and providing guidance for future regulatory activities involving licensing applications of these alternate methods to coupled systems

  19. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  20. TDRSS multimode transponder program. Phase 2: Equipment development

    Science.gov (United States)

    Cnossen, R. S.

    1974-01-01

    This report contains a complete description of the TDRS Multimode Transponder and its associated ground support equipment. The transponder will demonstrate candidate modulation techniques to provide the required information for the design of an eventual VHF/UHF transponder suitable for installation in a user satellite, capable of operating as part of a Tracking and Data Relay Satellite (TDRS) systems. Use of geosynchronous TDRS which can serve both low data rate users at VHF and high data rate users at other frequencies has been considered. The effects of radio frequency interference from the earth and of multipath propagation due to reflections from the earth are expected to pose problems for the TDRS system at VHF. Investigations have suggested several modulation techniques that offer promise to overcome these problems.

  1. Equipment designs for the spent LWR fuel dry storage demonstration

    International Nuclear Information System (INIS)

    Steffen, R.J.; Kurasch, D.H.; Hardin, R.T.; Schmitten, P.F.

    1980-01-01

    In conjunction with the Spent Fuel Handling and Packaging Program (SFHPP) equipment has been designed, fabricated and successfully utilized to demonstrate the packaging and interim dry storage of spent LWR fuel. Surface and near surface storage configurations containing PWR fuel assemblies are currently on test and generating baseline data. Specific areas of hardware design focused upon include storage cell components and the support related equipment associated with encapsulation, leak testing, lag storage, and emplacement operations

  2. Preventive maintenance basis: Volume 21 -- HVAC, air handling equipment. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 21 of the report provides a program of PM tasks suitable for application to HVAC-Air Handling Equipment. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  3. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  4. Technology transfer equipment qualification methodology for shelf life determination

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1995-01-01

    Discussions with a number of Nuclear Utilities revealed that equipment qualified for 10 to 40 years in the harsh environment of the plant was being assigned shelf lives of only 5 to 10 years in the benign environment of the warehouse, and then the materials were being trashed. One safety-related equipment supplier was assigning a 10-year qualified life, from date of shipment, with no recognition of the difference in the aging rate in the plant vs. that in the warehouse. Many suppliers assign shelf lives based on product warranty considerations rather than actual product degradation. An EPRI program was initiated to evaluate the methods used to assign shelf lives and to adapt the Arrhenius methodology, used in equipment qualification, to assign technically justifiable shelf lives. Temperature is the main factor controlling shelf life; however, atmospheric pressure, humidity, ultraviolet light, ozone and other atmospheric contaminants were also considered. A list of 70 representative materials was addressed in the program. All of these were found to have shelf lives of 14 years to greater than 60 years, except for 19 items. For 18 of these items, there was no data available except for the manufacturer's recommendation

  5. Policy analysis of the budget used in training program for reducing lower back pain among heavy equipment operators in the construction industry: System dynamics approach

    Science.gov (United States)

    Vitharana, V. H. P.; Chinda, T.

    2018-04-01

    Lower back pain (LBP), prevalence is high among the heavy equipment operators leading to high compensation cost in the construction industry. It is found that proper training program assists in reducing chances of having LBP. This study, therefore aims to examine different safety related budget available to support LBP related training program for different age group workers, utilizing system dynamics modeling approach. The simulation results show that at least 2.5% of the total budget must be allocated in the safety and health budget to reduce the chances of having LBP cases.

  6. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT

    International Nuclear Information System (INIS)

    Pepper, S.; Farnitano, M.; Carelli, J.; Hazeltine, J.; Bailey, D.

    2001-01-01

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process

  7. Engineering electrodynamics electric machine, transformer, and power equipment design

    CERN Document Server

    Turowski, Janusz

    2013-01-01

    Due to a huge concentration of electromagnetic fields and eddy currents, large power equipment and systems are prone to crushing forces, overheating, and overloading. Luckily, power failures due to disturbances like these can be predicted and/or prevented.Based on the success of internationally acclaimed computer programs, such as the authors' own RNM-3D, Engineering Electrodynamics: Electric Machine, Transformer, and Power Equipment Design explains how to implement industry-proven modeling and design techniques to solve complex electromagnetic phenomena. Considering recent progress in magneti

  8. Rest-lifetime evaluation of equipment and facilities of NPP Kozloduy 3 and 4 and development of an ageing management program

    International Nuclear Information System (INIS)

    Erve, M.; Schmidt, J.; Kastner, B.; Gledatchev, I.; Sabinov, S.; Stoev, M.; Korneev, V.; Strombach, Y.

    2001-01-01

    The task indicated in the title is part of a comprehensive upgrading program for Units 3 and 4 of the Kozloduy plant executed in a Consortium between Framatome ANP (a Framatome and Siemens company) and the Russian company Atomstroyexport. It comprises an evaluation of the residual service life of components/systems/plants subject to acceptance by international experts, identifying the need for further investigations/calculations in certain cases, and finding solutions for improvements that achieve a consensus of safety and economy. The initial results are: Walkdowns revealed no clear knock-out point for the plants, however there are preliminary hints for necessary further improvements. Investigations of templates taken from the RPV of Unit 1 were started: the results are still preliminary, but can be considered very positive; their transfer to the RPV of Unit 3 would mean that the latest safety analyses of the Unit 3 RPV are conservative. The general work program was successfully applied on the batteries as a pattern for the electrical equipment: parameters for the computer database and proposals for an effective aging management program were addressed. (author)

  9. Intelligent Processing Equipment Developments Within the Navy's Manufacturing Technology Centers of Excellence

    Science.gov (United States)

    Nanzetta, Philip

    1992-01-01

    The U.S. Navy has had an active Manufacturing Technology (MANTECH) Program aimed at developing advanced production processes and equipment since the late-1960's. During the past decade, however, the resources of the MANTECH program were concentrated in Centers of Excellence. Today, the Navy sponsors four manufacturing technology Centers of Excellence: the Automated Manufacturing Research Facility (AMRF); the Electronics Manufacturing Productivity Facility (EMPF); the National Center for Excellence in Metalworking Technology (NCEMT); and the Center of Excellence for Composites Manufacturing Technology (CECMT). This paper briefly describes each of the centers and summarizes typical Intelligent Equipment Processing (IEP) projects that were undertaken.

  10. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  11. Laboratory services series: a lubrication program

    Energy Technology Data Exchange (ETDEWEB)

    Bowen, H.B.; Miller, T.L.

    1976-05-01

    The diversity of equipment and operating conditions at a major national research and development laboratory requires a systematic, effective lubrication program. The various phases of this program and the techniques employed in formulating and administering this program are discussed under the following topics: Equipment Identification, Lubrication Requirements, Assortment of Lubricants, Personnel, and Scheduling.

  12. Laboratory services series: a lubrication program

    International Nuclear Information System (INIS)

    Bowen, H.B.; Miller, T.L.

    1976-05-01

    The diversity of equipment and operating conditions at a major national research and development laboratory requires a systematic, effective lubrication program. The various phases of this program and the techniques employed in formulating and administering this program are discussed under the following topics: Equipment Identification, Lubrication Requirements, Assortment of Lubricants, Personnel, and Scheduling

  13. Electrical equipment performance under severe accident conditions (BWR/Mark 1 plant analysis): Summary report

    International Nuclear Information System (INIS)

    Bennett, P.R.; Kolaczkowski, A.M.; Medford, G.T.

    1986-09-01

    The purpose of the Performance Evaluation of Electrical Equipment during Severe Accident States Program is to determine the performance of electrical equipment, important to safety, under severe accident conditions. In FY85, a method was devised to identify important electrical equipment and the severe accident environments in which the equipment was likely to fail. This method was used to evaluate the equipment and severe accident environments for Browns Ferry Unit 1, a BWR/Mark I. Following this work, a test plan was written in FY86 to experimentally determine the performance of one selected component to two severe accident environments

  14. Pooled inventory management: a unique cost-sharing program

    International Nuclear Information System (INIS)

    Bromenschenkel, K.E.

    1984-01-01

    A totally fresh approach to stocking an inventory of costly, long-lead-time nuclear plant equipment became a reality in January, 1981, after three years of effort to form the program. The program, known as Pooled Inventory Management (PIM), is now procuring the first equipment to be stocked in its inventory. This report describes the formation of PIM, how the program works, PIM accomplishments, equipment included in PIM stockpiles, and economics, implementation, and future plans of the program

  15. Space station wardroom habitability and equipment study

    Science.gov (United States)

    Nixon, David; Miller, Christopher; Fauquet, Regis

    1989-01-01

    Experimental designs in life-size mock-up form for the wardroom facility for the Space Station Habitability Module are explored and developed. In Phase 1, three preliminary concepts for the wardroom configuration are fabricated and evaluated. In Phase 2, the results of Phase 1 are combined with a specific range of program design requirements to provide the design criteria for the fabrication of an innovative medium-fidelity mock-up of a wardrobe configuration. The study also focuses on the design and preliminary prototyping of selected equipment items including crew exercise compartments, a meal/meeting table and a portable workstation. Design criteria and requirements are discussed and documented. Preliminary and final mock-ups and equipment prototypes are described and illustrated.

  16. Test and Analysis of Metallurgical Converter Equipment

    Directory of Open Access Journals (Sweden)

    Shan Pang

    2013-05-01

    Full Text Available Oxygen top-blow converter is the main equipment in steel making, and its work reliability decides the security and economy of steel production. Therefore, how to design and test analysis of convertor has been an important subject of industry research. Geometric modelling and structure analysis of converter tilting device by using Pro/E program .The design Principle, basic design structure were analyzed in detail. The computer simulation software of metallurgical converter equipment and how to use it were introduced .It developed by VC++ software. The position of barycentre and moment curve in No.3 and No.4 are calculated. The converter acceleration down dip can be resolved by comparing the moment curve and center curve.

  17. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  18. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  19. Future Years Defense Program (FYDP) Structure

    Science.gov (United States)

    2004-04-01

    computer miniframe . Intelligence Telecommunications Page E-330 of 1748DoD 7045.7-H, March, 2004 03 Command, Control, Comm, Intel, & SpaceProgram...communications programs, i.e., STARCOM, NAVCOM, and AIRCOM. Costs of equipment - computer miniframes , peripheral devices, communications processors...the general service communications programs, i.e., STARCOM, NAVCOM, and AIRCOM. Costs of equipment - computer miniframes , peripheral devices

  20. A Modified Model to Estimate Building Rental Multipiers Accounting for Advalorem Operating Expenses

    Directory of Open Access Journals (Sweden)

    Smolyak S.A.

    2016-09-01

    Full Text Available To develop ideas on building element valuation contained in the first article on the subject published in REMV, we propose an elaboration of the approach accounting for ad valorem expenses incidental to property management, such as land taxes, income/capital gains tax, and insurance premium costs; all such costs, being of an ad valorem nature in the first instance, cause circularity in the logic of the model, which, however, is not intractable under the proposed approach. The resulting formulas for carrying out practical estimation of building rental multipliers and, in consequence, of building values, turn out to be somewhat modified, and we demonstrate the sensitivity of the developed approach to the impact of these ad valorem factors. On the other hand, it is demonstrated that (accounting for building depreciation charges, which should seemingly be included among the considered ad valorem factors, cancel out and do not have any impact on the resulting estimates. However, treating the depreciation of buildings in quantifiable economic terms as a reduction in derivable operating benefits over time (instead of mere physical indications, such as age, we also demonstrate that the approach has implications for estimating the economic service lives of buildings and can be practical when used in conjunction with the market-related approach to valuation – from which the requisite model inputs can be extracted as shown in the final part of the paper.

  1. Study and development of equipment supervision technique system and its management software for nuclear electricity production

    International Nuclear Information System (INIS)

    Zhang Liying; Zou Pingguo; Zhu Chenghu; Lu Haoliang; Wu Jie

    2008-01-01

    The equipment supervision technique system, which standardized the behavior of supervision organizations in planning and implementing of equipment supervision, is built up based on equipment supervision technique documents, such as Quality Supervision Classifications, Special Supervision Plans and Supervision Guides. Furthermore, based on the research, the equipment supervision management information system is developed by Object Oriented Programming, which consists of supervision information, supervision technique, supervision implementation, quality statistics and analysis module. (authors)

  2. Demonstration of Advanced Geophysics and Classification Methods on Munitions Response Sites - East Fork Valley Range Complex, Former Camp Hale

    Science.gov (United States)

    2016-04-01

    47 8.2 COST BENEFIT ................................................................................................... 47 9.0...Campground (west of the ESTCP study area). The MRA is accessible to the public and used for recreation, including hiking and snowmobiling. The Colorado...reduction in number of anomalies requiring intrusive investigation (primarily labor, per diem, and equipment rental). 8.2 COST BENEFIT The primary

  3. Contributions to the research programs in nuclear and industrial electronics, domestic production of instrumentation, safety and control systems and equipment for nuclear reactors and auxiliary installations

    International Nuclear Information System (INIS)

    Talpariu, C; Talpariu, J.; Matei, C.

    2001-01-01

    Domestic production of component system and equipment for the control and safety of nuclear facilities was one of the priority objective of the Nuclear Research Institute Pitesti. The problems addressed were particularly related to design and production of analog and digital equipment for measurements, triggering and display of the values of process parameters as well as to regulating complex functions of this equipment. Associated to this effort were the research works concerning: - reliability and in-service life-time of the electronic components and equipment in the safety and control systems for nuclear processes; - radiation endurance of industrial electronic components; utilization of whirling currents in calandria tube testing; - expert systems and applications in nuclear reactor control and safety; design and testing methods of process real time software packages for safety in control critical systems for nuclear domain. There are presented characteristics of the following equipment: 1. amplifier for ionization chambers with triggering comparator circuits for the CANDU 600 reactor shut down system; 2. amplifier for ionization chambers without triggering comparator circuits for power regulating system; 3. safety and regulating computerized system for C9 and C5 cans; 4. acquisition system for dosimetric data in nuclear facilities; 5. program able digital comparator for the reactor shut down system; 6. stationary gamma areal monitors for CANDU 600 reactors and other nuclear facilities

  4. Consenso e diferenças em equipes do Programa Saúde da Família Agreements and disagreements in the Family Health Care Program team

    Directory of Open Access Journals (Sweden)

    José Ivo dos Santos Pedrosa

    2001-06-01

    Full Text Available OBJETIVO: Identificar temáticas que promovam consenso e divergências entre médicos, enfermeiros e agentes que compõem a equipe do Programa Saúde da Família. MÉTODOS: Estudo qualitativo que utiliza grupos focais como técnica de pesquisa com agentes masculinos e femininos, médicos e enfermeiras da equipe do Programa Saúde da Família, em Teresina, PI. Foram realizadas sessões com os grupos, conduzidas por monitor e participação de observador, utilizando roteiro com as questões: inserção no programa; processo de capacitação; princípios do programa; relações com a formação e com o modelo assistencial predominante; relações entre membros da equipe e comunidade; serviços demandados e disponíveis; situação trabalhista e condições de trabalho; e fatores positivos e negativos. RESULTADOS: Temáticas gerais como trabalho na comunidade, cuidados preventivos e trabalho em equipe geraram consenso entre as três categorias de profissionais. Temas que reforçaram a divisão entre categorias foram salário, organização do processo de trabalho, relações com a comunidade, responsabilidades da equipe e estratégias de atendimento à demanda. Temas que promoveram o aparecimento de subgrupos em cada categoria foram: condições de trabalho, salário, relações com a comunidade e responsabilidades da equipe. CONCLUSÕES: Temas que evidenciaram diferenças em maior grau reforçaram as características corporativas de cada categoria, enquanto temas que promoveram o aparecimento de subgrupos foram discutidos a partir de referências externas, implicando a necessidade de definir especificidades do processo de trabalho no programa. As estratégias para atendimento às demandas da comunidade representaram temáticas emergenciais ao grupo de agentes, pois a eles coube a solução imediata para os problemas na relação comunidade e serviço.OBJECTIVE: To identify issues that promote agreement and disagreement among doctors, nurses, and

  5. SAT's infrared equipment using second-generation detectors

    Science.gov (United States)

    Siriex, Michel B.

    1995-09-01

    In 1982 SAT proposed for the first time a second generation detector in the design of FLIRs for the TRIGAT program, since then different types of IR equipment have been developed on the basis of this technology: (1) An infra-red seeker for the MICA missile. (2) Three types of IRST: VAMPIR MB for naval applications, SIRENE for the Army and OSF for the Rafale aircraft. (3) Three thermal imagers: Condor 1 for the mast mounted sight equipping the long range anti tank system, Tiger installed on the sight of the medium range antitank system, and Condor 2 for the pilot sight of the TRIGAT French-German helicopter. Infra-red detectors are MCT IR-CCD focal plane arrays developed by SOFRADIR with the objective of the best standardization possible in spite of different configurations and specifications for each program. In this paper, we intend to present the main features of this technology for these programs and the advantages obtained by comparison with the first generation in terms of performance. Industrialization of these products is starting now, and a specific effort has been made to standardize the components, especially the driving and read out electronics. A set of ASICs has been developed to make compact detection modules including a detector in his dewar, a cooling machine, and a proximity electronic.

  6. 78 FR 63410 - Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment...

    Science.gov (United States)

    2013-10-24

    ... test procedures for direct heating equipment and pool heaters established under the Energy Policy and... U.S.C. 6293(e)(2)) The current energy conservation standards for direct heating equipment and pool... DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket Number EERE-2013-BT-TP-0004] RIN 1904-AC94 Energy...

  7. Challenges of equipment qualification using today's standards with emphasis on a class 1E motor program

    International Nuclear Information System (INIS)

    Deaton, K.

    1995-01-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed

  8. INCREASING OF ECOLOGICAL EFFICIENCY OF WORN EQUIPMENT BY PARTIAL UPDATES. ANALYTICAL AND CONTROL ASPECT

    Directory of Open Access Journals (Sweden)

    S. Voinova

    2017-12-01

    Full Text Available The current state of worn industrial equipment and the resulting low performance indicators of its functioning, in particular, low environmental friendliness, are considered. It is shown that the normalization of the complex situation that has developed in production is an acute problem, the solution of which should begin with the implementation of a program for the partial renewal of worn equipment. It is pointed out that there is a high potential for improving the technological, including ecological, efficiency of functioning of the upgraded equipment. It is pointed out that the partial renewal is highly efficient, because of the small specific investments in it. The significant influence of the quality of control of the setting and implementation of the renewal program on its effectiveness was noted. It is shown that the process of renewal of worn-out equipment, ultimately, has an environmental focus, increases the environmental friendliness of the updated technical facility.

  9. 34 CFR 682.401 - Basic program agreement.

    Science.gov (United States)

    2010-07-01

    ..., but not limited to, housing, utilities, food, medical costs, dependent care costs, work-related... hospitality suites, tickets to shows or sporting events, meals, alcoholic beverages, and any lodging, rental... training to students and their families in budgeting and financial management, including debt management...

  10. Upgrade programs. Status and prospective

    International Nuclear Information System (INIS)

    Loyer, F.

    1998-01-01

    Arguments for launching a renovation program for GANIL system, taking into account aging and wear, are analyzed. A statistics of failures related to vacuum systems, power supplies, electronics, cooling systems, beam dumps and other equipment is given. The renovation program is targeted to: replacement of obsolete components, introduction of advanced systems of failure diagnosis, augmentation of performances of the new regulating and control system and improvement in the performance characteristics of certain fundamental equipment. The first results and to date status of the program development is reported. Mentioned are the works related to control of HF cavities and the associated amplifiers, electronics, the system of cavity synchronization, power supply, RMN, system commutation grid, pumping equipment, etc. Also, improvements concerning the machine data acquisition and online processing are referred to as well as program cost estimations

  11. Landlord Program multi-year program plan fiscal year 1995 WBS 7.5

    International Nuclear Information System (INIS)

    Young, C.L.

    1994-01-01

    The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items

  12. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  13. Monitoring equipment environment during nuclear plant operation at Salem and Hope Creek generating stations

    International Nuclear Information System (INIS)

    Blum, A.; Smith, R.J.

    1991-01-01

    Monitoring of environmental parameters has become a significant issue for operating nuclear power plants. While the long-term benefits of plant life extension programs are being pursued with comprehensive environmental monitoring programs, the potential effect of local hot spots at various plant locations needs to be evaluated for its effect on equipment degradation and shortening of equipment qualified life. A significant benefit can be experienced from temperature monitoring when a margin exists between the design versus actual operating temperature. This margin can be translated into longer equipment qualified life and significant reduction in maintenance activities. At PSE and G, the immediate need for monitoring environmental parameters is being accomplished via the use of a Logic Beach Bitlogger. The Bitlogger is a portable data loggings system consisting of a system base, input modules and a communication software package. Thermocouples are installed on selected electrical equipment and cables are run from the thermocouples to the input module of the Bitlogger. Temperature readings are taken at selected intervals, stored in memory, and downloaded periodically to a PC software program, i.e., Lotus. The data is formatted into tabular or graphical documents. Because of their versatility, Bitloggers are being used differently at the authors Nuclear facility. At the Salem Station (2 Units-4 loop Westinghouse PWR), a battery powered, fully portable, calibrated Bitlogger is located in an accessible area inside Containment where it monitors the temperature of various electrical equipment within the Pressurizer Enclosure. It is planned that close monitoring of the local hot spot temperatures in this area will allow them to adjust and reconcile the environmental qualification of the equipment

  14. Lighting the Gym: A Guide to Illuminating Non-Traditional Spaces.

    Science.gov (United States)

    Womack, Jennifer; Nelson, Steve

    2000-01-01

    Covers all the steps needed to light an open, non-traditional performance space--everything from where to locate lights, support towers, and power sources, to cable and dimmer requirements. Covers safety issues, equipment costs, what students should and should not be allowed to do, and how to deal with electricians and rental companies. (SC)

  15. Unresolved Safety Issue A-46 - seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Anderson, N.

    1985-01-01

    Seismic Qualification of Equipment in Operating Plants was designated as an Unresolved Safety Issue (USI) in December, 1980. The USI A-46 program was developed in early 1981 to investigate the adequacy of mechanical and electrical equipment in operating plants to withstand a safe shutdown earthquake. The approach taken was to develop viable, cost effective alternatives to current seismic qualification licensing requirements which could be applied to operating nuclear power plants. The tasks investigated include: (1) identification of seismic sensitive systems and equipment; (2) assessment of adequacy of existing seismic qualification methods; (3) development and assessment of in-situ test procedures to assist in qualification of equipment; (4) seismic qualification of equipment using seismic experience data; and (5) development of methods to generate generic floor response spectra. Progress to date and plans for completion of resolution are reported

  16. The role of lubricant analysis in maximizing lubricant and equipment life

    International Nuclear Information System (INIS)

    Janis, J.

    1995-01-01

    Lubricant analysis has always played an important yet somewhat invisible role in equipment health monitoring. At its most primitive, simple observations and field testing alert equipment operators to changing conditions. At its most advanced, data from performance and analytical tests are used to develop or select optimum lubricants for service, stretch drain intervals, predict remaining equipment life and identify potential equipment or system problems at an incipient stage. Coupled with thermography and vibration analysis, lubricant analysis can become a major component of a comprehensive predictive maintenance (PM) program. Ontario Hydro finds itself at a turning point regarding the use and monitoring of lubricants. Increasing emphasis on equipment reliability and plant life extension, coupled with major, recent changes in lubricant composition in response to environmental, energy and safety concerns, forces an upgrading of many aspects of lubricant monitoring so that it may establish itself as a key part of modern PM practices. This paper discusses some of these aspects. (author)

  17. Recommendations for managing equipment aging in nuclear power plants

    International Nuclear Information System (INIS)

    Gunther, W.E.; Subudhi, M.; Aggarwal, S.K.

    1992-01-01

    Research conducted under the auspices of the US NRC's Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures

  18. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Wiehagen, J. [Partnership for Home Innovation, Upper Marlboro, MD (United States); Del Bianco, M. [Partnership for Home Innovation, Upper Marlboro, MD (United States); Mallay, D. [Partnership for Home Innovation, Upper Marlboro, MD (United States)

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.

  19. THE CORRELATION BETWEEN STUDENTS’ LEARNING STYLES AND PARENTS’ ATTENTION WITH MEASURING EQUIPMENT ACHIEVEMENT OF THE TENTH GRADE STUDENTS OF AUTOMOTIVE ENGINEERING EXPERTISE PROGRAM OF STATE VOCATIONAL HIGH SCHOOL PIRI SLEMAN IN THE ACADEMIC YEAR 2013/2014

    Directory of Open Access Journals (Sweden)

    Moh. Sulhan Haidi

    2014-12-01

    Full Text Available This research is aimed at finding out (1 the correlation  between students’ learning styles and measuring equipment achievement of the tenth grade students of Automotive Engineering Expertise Program of State Vocational High School Piri Sleman in the academic year 2013/2014; (2 the correlation between parents’ attention with measuring equipment achievement of the tenth grade students of Automotive Engineering Expertise Program of State Vocational High School Piri Sleman in the academic year 2013/2014; (3 the correlation between students’ learning styles and parents’ attention with measuring equipment achievement of the tenth grade students of Automotive Engineering Expertise Program of State Vocational High School Piri Sleman in the Academic Year 2013/2014. The kind of this research is correlation study and categorized as ex post facto. The population of the research was 105 students while the sample was 82 students counted from Isaac and Michael formula. The technique of sampling used in this research was simple random sampling. The technique of the data collection was questionnaire and documentation. Item validity was computed from product moment correlation. Item reliability was calculated by using alpha formula. The technique of data analysis used in this study was partial correlation and doubled correlation analyses. Precondition testing analysis (normality, linearity, and multi co linearity testing, Based on the data analysis, the results were as follows: (1 there is a positive and significant correlation between students’ learning styles (X1 and measuring equipment achievement (Y; (2 there is a positive and significant correlation between parents’ attention (X2 with measuring equipment achievement (Y; (3 there is a positive and significant correlation between students’ learning styles (X1 and parents’ attention (X2 with measuring equipment achievement (Y.

  20. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  1. Evaluation of China's local enforcement of energy efficiency standards and labeling programs for appliances and equipment

    International Nuclear Information System (INIS)

    Khanna, Nina Zheng; Zhou, Nan; Fridley, David; Fino-Chen, Cecilia

    2013-01-01

    Aims: This paper aims to evaluate local enforcement of China's mandatory appliance and equipment energy efficiency standards and labeling programs, two increasingly important policies for meeting national energy and carbon reduction targets. The expected energy savings of efficiency standards and labels can be fully realized only with strong enforcement to ensure compliance for all products sold. This paper provides comprehensive retrospective evaluation of the methodologies, results, progress and remaining challenges in pilot enforcement projects initiated in the absence of consistent national check-testing focused on energy efficiency. Scope: This paper's scope is focused on 2006–2009 pilot local check-tests conducted to verify appliance and equipment compliance with China's mandatory energy label and efficiency standards. Conclusions: This paper finds both improvement and some backsliding in compliance rates over time. Compared to earlier efforts, 2009 check-tests covered a wider regional and product scope but demonstrated greater variation in compliance rates. Labeling display and energy efficiency compliance was generally high across regions and most products, but lower compliance rates were observed in less economically developed regions and for lighting and industrial products. Based on these findings, areas for improvement in local awareness, product sampling methodology, check-testing tools and procedures are identified. - Highlights: • China's mandatory standards and labeling crucial to national energy saving goals. • China's 2006–2009 pilot efficiency check-testing for standards and labeling evaluated. • Wider geographic and product scope in 2009, but greater variation in compliance. • Generally high compliance, but lower rates for less economically developed region. • Local check-test capacity improving but methodological challenges remain

  2. Achievement report for fiscal 1999 on New Sunshine Program. Frontier research and development of basic superconductive AC power generation equipment; 1999 nendo koryu chodendo denryoku kiki kiban sendo kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As part of the New Sunshine Program of the Agency of Industrial Science and Technology, a 2-year survey and research is conducted beginning in 1998 on the effect of the introduction of superconductive power equipment for the facilitation of the progress of research and development of basic power equipment which utilizes AC (alternating current) superconductivity. Frontier research and development has been started of basic AC superconductive power equipment for clarifying the tasks to solve in the development effort and for preparing an efficient research and development plan. This fiscal year's endeavor covers the survey of the effect of the introduction of superconductive power equipment in addition to the preparation of a basic plan for the research and development of basic AC superconductive power equipment for fiscal 2000 and afterward, continued survey of research and development trends in and outside Japan for the review of the result achieved in the preceding fiscal year, development of AC equipment element technologies utilizing conduit type semiconductors as a basic study for the embodiment of AC superconductive equipment, and a study for elucidating the mechanism of resistance generated in a superconductive current limiter. Furthermore, papers on the superconduction technology released so far are investigated, and technology development trends and efficient research techniques are put together into a technological information database. (NEDO)

  3. Achievement report for fiscal 1999 on New Sunshine Program. Frontier research and development of basic superconductive AC power generation equipment; 1999 nendo koryu chodendo denryoku kiki kiban sendo kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As part of the New Sunshine Program of the Agency of Industrial Science and Technology, a 2-year survey and research is conducted beginning in 1998 on the effect of the introduction of superconductive power equipment for the facilitation of the progress of research and development of basic power equipment which utilizes AC (alternating current) superconductivity. Frontier research and development has been started of basic AC superconductive power equipment for clarifying the tasks to solve in the development effort and for preparing an efficient research and development plan. This fiscal year's endeavor covers the survey of the effect of the introduction of superconductive power equipment in addition to the preparation of a basic plan for the research and development of basic AC superconductive power equipment for fiscal 2000 and afterward, continued survey of research and development trends in and outside Japan for the review of the result achieved in the preceding fiscal year, development of AC equipment element technologies utilizing conduit type semiconductors as a basic study for the embodiment of AC superconductive equipment, and a study for elucidating the mechanism of resistance generated in a superconductive current limiter. Furthermore, papers on the superconduction technology released so far are investigated, and technology development trends and efficient research techniques are put together into a technological information database. (NEDO)

  4. Aplicação da programação dinâmica na substituição de equipamentos Application of dynamic programming in equipment substitution

    Directory of Open Access Journals (Sweden)

    Gláucio Marcelino Marques

    2005-10-01

    Full Text Available Este trabalho teve como objetivo desenvolver um modelo de programação dinâmica, para determinar o momento ótimo de substituição de equipamentos, incorporando-se as receitas geradas pelo uso e descarte da máquina. Tal modelo deverá procurar maximizar os lucros através de uma relação de recorrência referente às receitas e aos custos ao longo dos anos. Desse modo, comparou-se o modelo proposto com um tradicional de substituição, que inclui apenas custos, utilizado por Filgueiras (1997. O modelo proposto foi satisfatório, de acordo com o objetivo do trabalho, pois com o seu desenvolvimento foi possível oferecer decisões ótimas de substituir ou reter o equipamento. Tal modelo se apresentou mais flexível, podendo ser utilizado em situações em que o equipamento gera receitas diretas (como no caso de aluguel ou receitas de fretes ou não. Quando não se utilizam receitas, os resultados são idênticos aos do modelo tradicional. Constatou-se, também, que o modelo proposto é mais suscetível a aumentos no valor de aquisição do equipamento, enquanto o modelo sem receita é mais sensível a variações na taxa de juros. Observou-se que a aplicação da Programação Dinâmica oferece ao planejador uma gama de alternativas bem maior para auxiliar a tomada de decisão.The objective of this work was to develop a dynamic programming model to determine the optimal time to replace equipment, including the incomes generated by the use and removal of the machine, aiming at the maximization of profits through a recurrence relation related to the incomes and costs along the years. Thus, the proposed model was compared to the traditional replacement model using the dynamic programming that does not include the income generated by the equipment, used by Filgueiras (1997. The model proposed was satisfactory according to the objective of the work, as its development made it possible to offer optimal decisions to replace or maintain the equipment

  5. Evaluation of the revised training program for senior control room staff: science fundamentals and equipment principles

    International Nuclear Information System (INIS)

    Jervis, R.E.; Evans, G.J.

    1996-10-01

    Canadian nuclear utilities have formed an Inter-Utility Working Group to revise their program for training nuclear generating station senior control room staff, namely Control Room Operators and Shift Supervisors, in Science Fundamentals and Equipment Principles. This report documents the findings of an external review of this revision process, addressing, amongst other topics, the process of revision undertaken by the Working Group, their outline of topics to be included, and, the pertinence and comprehensiveness of the detailed training objectives identified for two of the courses. The approach to revising the program being followed by the Working Group appears to be reasonable insomuch that some training needs have been identified and used to construct detailed sets of training objectives. However, as assessed by the consultants without full documentation being available, some important steps appear to have been missed. Specifically, much of the basis of the revision process has not been documented, neither has the approach selected for the revision process, nor has any justification for not performing a CANDU specific job and task analysis been offered. Furthermore, the Working Group has not yet proposed any criteria for evaluation of the program or provided any test items. As a result, the consultants have had to develop criteria for evaluation of the overall program and of individual courses. These criteria were applied in a more detailed review of the training objectives for two particular courses: Plant Chemistry, and Nuclear Physics and Reactor Theory. Many of the training objectives for these courses were found to be too qualitative or ones that require trainees to memorize blocks of information rather than develop in them an ability to arrive at conclusions about scientific phenomena using principles and reasoning. This assessment indicates that the training objectives are designed to achieve too low a level of cognition, inconsistent with developing an

  6. The organization of professional predictions on the development of automation for stope equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kanygin, U.M.; Markashov, V.E.; Pashchevskii, U.G.

    1980-01-01

    The problems of organizing and conducting experimental predictions on the development of automation for stope equipment are examined. Professional evaluations are developed, and the order for processing the results is given, together with a calculation program for use with the ES-1020 computer. Several results from predictive studies of the development of automation for use with stope equipment are given.

  7. Research in application of mobile diesel equipment in underground mines (III)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    It is third project year on `Application of mobile diesel equipment in underground mines` for providing appropriate measures to improve underground working environment contaminated by the diesel exhaust pollutants. This report consists of 4 articles. 1) The development and site investigation of fume diluter, 2) Development of simulation programs for three dimensional movement of fluid, 3) Study of the local ventilation technology in the working face using diesel equipment, 4) Disaster and hazard prevention research. (author). 22 refs., 19 tabs., 83 figs.

  8. 78 FR 17349 - Section 538 Guaranteed Rural Rental Housing Program 2013 Industry Forums-Open Teleconference and...

    Science.gov (United States)

    2013-03-21

    ... or via web link. However, if it appears that existing capabilities may prevent the Agency from... program changes on Section 538 financing. USDA prohibits discrimination against its customers, employees..., gender identity, religion, reprisal and where applicable, political beliefs, marital status, familial or...

  9. Summer Faculty Research Program (SFRP) (1992). Volume 1. Program Management Report.

    Science.gov (United States)

    1992-12-01

    for expenses (i.e., for their to/from trip, privately owned automobile mileage at ($0.25) per mile). A rental-car’s cost is not an authorized...Professor SPECIALTY: Psychology Dept of Social Sciences LABORATORY: AL/ HRM Winston-Salem State University Winston-Salem, NC 27110 Robert J. Turnbull DEGREE...Psychology Dept of Psychology LABORATORY: AL/ HRM Columbus, OH 43210-1222 Ronald L. O(l{svor DEGREE: "S Ohio State University SPECIALTY: Electrical

  10. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  11. 40 CFR 1068.435 - May I sell engines/equipment from a family with a suspended certificate of conformity?

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS Selective Enforcement Auditing § 1068.435 May I sell engines/equipment from a family with a... of equipment you produce and show it complies with emission standards that apply. (b) We...

  12. Challenges of equipment qualification using today`s standards with emphasis on a class 1E motor program

    Energy Technology Data Exchange (ETDEWEB)

    Deaton, K.

    1995-02-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed.

  13. Studies and research concerning BNFP: cask handling equipment standardization

    International Nuclear Information System (INIS)

    McCreery, P.N.

    1980-10-01

    This report covers the activities of one of the sub-tasks within the Spent LWR Fuel Transportation Receiving, Handling, and Storage program. The sub-task is identified as Cask Handling Equipment Standardization. The objective of the sub-task specifies: investigate and identify opportunities for standardization of cask interface equipment. This study will examine the potential benefits of standardized yokes, decontamination barriers and special tools, and, to the extent feasible, standardized methods and software for handling the variety of casks presently available in the US fleet. The result of the investigations is a compilation of reports that are related by their common goal of reducing cask turnaround time

  14. Structure Analysis of the Graphic Simulator for the PRIDE Equipment

    International Nuclear Information System (INIS)

    Kim, Chang Hoi; Kim, Seong Hyun; Park, Byung Suk; Lee, Jong Kwang; Lee, Hyo Jik; Kim, Ki Ho

    2010-12-01

    Simulation technology based on the computer graphics is able to minimize the trial and error and reduce the development cost and period dramatically at the design stage of the pyroprocessing facility construction and the equipment development. For this purpose, the 3D graphic simulation program named HotCell has been developed. HotCell has continuously updated for the functional addition and the bug fix, and now it reaches version third. The Digital mockup of PRIDE is furnished with the MSM(matster-slave manipulator), BDSM(bridge transported dual arm servo manipulator) and Crane in order to remote handling the processing equipment. HotCell program can be interface with the 3D mouse, the haptic device and the joystick for the realistic operation of above device. The posture of MSM can be recorded with the simple keyboard operation in order to reproduce the behavior of the MSM

  15. Effects of Vacation Rental Websites on the Concentration of Tourists-Potential Environmental Impacts. An Application to the Balearic Islands in Spain.

    Science.gov (United States)

    Martín, José María Martín; Martín, José Antonio Rodriguez; Mejía, Karla Aída Zermeño; Fernández, José Antonio Salinas

    2018-02-15

    The concentration of tourists at certain times of the year can damage sensitive environments. The use of peer-to-peer vacation rental websites has increased greatly during the last decade. This system could either reduce seasonality in touristic destinations where the tourist activity takes place throughout the year at a lower price or on the contrary, it could increase the number of visitors at certain times of the year even more. This paper intends to analyze the effect that these platforms have on tourism seasonality in order to calculate if they help reduce or increase the pressure on the destinations. To do so, the Gini Index has been applied to one of the main touristic spots in Europe, the Balearic Islands in Spain. The conclusion is that this type of accommodation has aggravated the problem, generating a greater concentration of tourists and a higher pressure on the resources of the islands.

  16. IEEE standard for design qualification of safety systems equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This standard is written to serve as a general standard for qualification of all types of safety systems equipment, mechanical and instrumentation as well as electrical. It also establishes principles and procedures to be followed in preparing specific safety systems equipment standards. Guidance for qualifying specific safety systems equipment may be found in various specific equipment qualification standards that are now available or are being prepared. It is required that safety systems equipment in nuclear power generating stations meet or exceed its performance requirements throughout its installed life. This is accomplished by a disciplined program of design qualification and quality assurance of design, production, installation, maintenance and surveillance. This standard is for the design qualification section of the program only. Design qualification is intended to demonstrate the capability of the equipment design to perform its safety function(s) over the expected range of normal, abnormal, design basis event, post design basis event, and in-service test conditions. Inherent to design qualification is the requirement for demonstration, within limitations afforded by established technical state-of-the-art, that in-service aging throughout the qualified life established for the equipment will not degrade safety systems equipment from its original design condition to the point where it cannot perform its required safety function(s), upon demand. The above requirement reflects the primary role of design qualification to provide reasonable assurance that design- and age-related common failure modes will not occur during performance of safety function(s) under postulated service conditions

  17. 77 FR 16203 - Section 538 Guaranteed Rural Rental Housing Program 2012 Industry Forums-Open Teleconference and...

    Science.gov (United States)

    2012-03-20

    .... However, if it appears that existing capabilities may prevent the Agency from accommodating all requests... Section 515 developments. The impact of Low Income Housing Tax Credits program changes on Section 538..., genetic information, political beliefs, reprisal, or because all or part of an individual's income is...

  18. Regulation EM-GT-8. Guidance for quality control of mammography equipment

    International Nuclear Information System (INIS)

    2015-01-01

    Objective: To provide practical guidance of technical procedures for carrying out quality control in mammography equipment. Scope: This guide applies to mammography equipment. A number of methods which require the appointed instrumentation described, some of which can be implemented in radiology services own country given the low complexity of themselves and others that require specific equipment and can be performed by specialized groups external to these units. The guide does not constitute a mandatory, however, the parameters evaluated according to the tests described therein and their tolerances form the basis of regulations that establish the CCEEM about these teams. Overview: The success of mammographic studies depends on obtaining high-quality images combined with a low rate of patient dose. To ensure this objective the establishment of quality assurance programs on all aspects involving these services is necessary. This guide provides a number of quality control procedures aimed at x-ray equipment, which must be performed at least on an annual basis or when some maintenance occurs at x-ray equipment.

  19. Nevada Test Site closure program

    International Nuclear Information System (INIS)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use

  20. 77 FR 10291 - Energy Conservation Program: Test Procedure for Commercial Refrigeration Equipment

    Science.gov (United States)

    2012-02-21

    ... Volume and Total Shelf Area of Household Refrigerators and Household Wine Chillers''; and sections 5.1..., some equipment is designed for storing goods such as wine, candy, and flowers at temperatures that are..., No. 19 at p. 145), and offered that night curtains could provide benefits for doored cases. (Zero...

  1. 76 FR 8712 - Section 538 Guaranteed Rural Rental Housing Program 2011 Industry Forums-Open Teleconference and...

    Science.gov (United States)

    2011-02-15

    ... existing capabilities may prevent the Agency from accommodating all requests for one form of participation... developments. The impact of Low Income Housing Tax Credits program changes on Section 538 financings. USDA... information, political beliefs, reprisal, or because all or part of an individual's income is derived from any...

  2. Constancy check of beam quality in conventional diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Costa, Alessandro M.; Badin, Romulo S.; Leite, Marina S.; Caldas, Linda V.E.

    2008-01-01

    A tandem ionization chamber was developed for quality control programs of X-ray equipment used in conventional radiography and mammography. A methodology for the use of the tandem chamber in the constancy check of diagnostic X-ray beam qualities was established. The application at a medical X-ray imaging facility of this established methodology is presented. The use of the tandem chamber in the constancy check of diagnostic X-ray beam qualities is a useful method to control the performance of the X-ray equipment

  3. Design of equipment management information system for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Chengyuan

    1996-01-01

    The author describes the ideas and practical method for need analysis, system function dividing, code design, program design and network disposition of equipment purchase management system of nuclear power plant during building, from the view of engineering investment control, schedule control and quality control

  4. Environmental impact of the programs of substitution of room type air conditioning equipment; Impacto ambiental de los programas de sustitucion de equipos de aire tipo cuarto

    Energy Technology Data Exchange (ETDEWEB)

    Alarcon Aleman, Jose Mauricio [OLADE, Quito (Ecuador)

    2002-09-01

    The present article approaches in a general way the relation that exists between the environment and the saving of electrical energy, especially in the Programs of Demand Side Management (DSM). In particular form the potential environmental impacts are described, derived of the use and the discard of the room type air conditioning equipment, goes deep into the characteristics of their cooling fluids, as well as in the relation that these keep with the protocols of Montreal and Kyoto. Finally, this article comments the incidence which have, the manufacturers as the institutions that implement DSM programs, on the environmental part of the programs of substitution of room type air conditioning equipment. In addition it is briefly described, the pilot program developed by Fideicomiso para el Ahorro de Energia Electrica (FIDE) as a successful case. [Spanish] En forma general, el presente articulo aborda la relacion que existe entre el medio ambiente y el ahorro de energia electrica, especialmente en los Programas de Administracion por el Lado de la Demanda (ALD). En forma particular se describen los impactos ambientales potenciales, derivados del uso y desecho de los equipos de aire acondicionado tipo cuarto, se ahonda en las caracteristicas de sus refrigerantes, asi como en la relacion que estos guardan con los protocolos de Montreal y Kioto. Finalmente, se comenta la incidencia que tienen, tanto los fabricantes como las instituciones que implementan programas de ALD, sobre la parte ambiental de los programas de sustitucion de equipos de aire acondicionado tipo cuarto. Ademas se describe brevemente, el programa piloto desarrollado por el Fideicomiso para el Ahorro de Energia Electrica (FIDE) como un caso exitoso.

  5. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  6. Zirconium-made equipment for the new La Hague reprocessing plants

    International Nuclear Information System (INIS)

    Decours, J.; Demay, R.; Bernard, C.; Mouroux, J.P.; Simonnet, J.

    1991-01-01

    The use of zirconium was developed to solve some problems of severe corrosion in boiling nitric medium, and to guarantee the service life of the equipment concerned. The paper presents the experience gained since the early 1970s, when the first units made of zirconium were used in French reprocessing plants. For the new La Hague UP3 and UP2 800 plants, it was decided to extend the use of zirconium to make large-scale equipment and, to do so, a major R and D program was implemented, of which the main results are presented

  7. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  8. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  9. Infrared thermography program at Darlington NGD

    International Nuclear Information System (INIS)

    Speer, B.

    1997-01-01

    Infrared thermography is a proven predictive maintenance tool for improving equipment reliability and reducing maintenance costs. It has been identified as one of the maintenance technologies that could contribute to the reduction of OHN forced incapability factor. At Darlington NGD a program has been established by combining OHN and Nuclear Maintenance Applications Center (NMAC) operating experience. This presentation outlines the development and implementation of this program. The main points are: roles and responsibilities, equipment selection, software requirements, manpower level, inspection equipment, training and a cost/benefit review. (author)

  10. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  11. 78 FR 64295 - Energy Conservation Program: Test Procedure for Commercial Refrigeration Equipment

    Science.gov (United States)

    2013-10-28

    ... they are consumer products or commercial and industrial equipment. Under 42 U.S.C. 6314(c)(1), no later... requirements a consumer would expect. DOE requests comment on the proposed definition for chef base or griddle... projection is normal to the plane of the door, and the way customers typically view products through the door...

  12. Safety management of software-based equipment

    CERN Document Server

    Boulanger, Jean-Louis

    2013-01-01

    A review of the principles of the safety of software-based equipment, this book begins by presenting the definition principles of safety objectives. It then moves on to show how it is possible to define a safety architecture (including redundancy, diversification, error-detection techniques) on the basis of safety objectives and how to identify objectives related to software programs. From software objectives, the authors present the different safety techniques (fault detection, redundancy and quality control). "Certifiable system" aspects are taken into account throughout the book. C

  13. Implementation of a quality control program of the equipment of the nuclear medicine services in Chile

    International Nuclear Information System (INIS)

    Astudillo, R.; Diaz, G.; Ferreira, A.; Garcia, M.; Hermosilla, A.; Pacheco, F.; Vasquez, M.; Coca, M.

    2014-08-01

    Now days in Chile there are more of 43 Nuclear Medicine centers; most of them have gamma cameras in order to study physiological process in diagnostic and treatment of patients pathologies. This requires having the equipment in optimal operating condition and it is ensured with quality control programs that are based on a series of tests relating to protocols, such as TECDOC-602 y AAPM No.6. Planar test often applied in gamma cameras including: spatial resolution, spatial linearity, sensitivity and uniformity. SPECT tests consider: tomography uniformity, rotation center tomography resolution and total performance. The tests in dose calibrator are: background measurement, accuracy, precision, linearity and reproducibility. The tests above require the use of radioactive sources and specific simulators patterns or phantom based on international standards such as The National Electrical Manufacturers Association (Nema), International Atomic Energy Agency (IAEA) and The American Association of Medical Physics (AAPM). In this work we carried out several tests of quality control in a Nuclear Medicine Center of Temuco and we propose to implement the applied methodology in others similar Chilean centers. (author)

  14. Społeczne budownictwo czynszowe jako usługa w ogólnym interesie gospodarczym

    OpenAIRE

    Bujny, Jędrzej; Maśliński, Mikołaj

    2016-01-01

    Social rental housing is one of the possible instruments which are applied to ensure the satisfaction of housing needs. However, public funds which are transferred to entities that operate within this area should be usually classified as State aid. The analysis presented in this paper concerns the following question: is it possible to consider the operation of a social rental housing program as services of general economic interest. This question seems to be a topical issue because of a new le...

  15. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  16. Farm Recording Kelompok Tani Timbul Karya Kecamatan Paliyan Kabupaten Gunungkidul

    Directory of Open Access Journals (Sweden)

    Agus Dwi Nugroho

    2017-03-01

    Full Text Available Farmers group of “Timbul Karya” has variousassets being rent yet systematically recorded. This community service activity aims to help the farmer group for: (1 preparing the rental activities form filling of assets withitsraining and (2 analyzing the feasibility of soybean farming of the farmer group. Methods used in this community service are training and mentoring. Mentoring is done on making asset management form and analyzingthe farming feasibility, while the training is done with administrative management subject. The administration form consists of on farming activities, save and loan of paddy grain, rental of farm equipment, and rental of partyequipment. The training activity to give a performance description of the group empowerment. The results of the analysis of soybean farming provide R/C value of 2.81 which means that the farming were profitable. Farming analysis also shows that the increasing of soybean production can be solved by enlarge the planted area and the use of urea fertilizer. In addition, given advice to review the increase in revenues, government should giving high soybean prices shifting as well as providing assistance for the production facilities to reduce the productioncost.

  17. Connecticut State University System Initiative for Nanotechnology-Related Equipment, Faculty Development and Curriculum Development

    Energy Technology Data Exchange (ETDEWEB)

    Broadbridge, Christine C. [Southern Connecticut State University

    2013-03-28

    DOE grant used for partial fulfillment of necessary laboratory equipment for course enrichment and new graduate programs in nanotechnology at the four institutions of the Connecticut State University System (CSUS). Equipment in this initial phase included variable pressure scanning electron microscope with energy dispersive x-ray spectroscopy elemental analysis capability [at Southern Connecticut State University]; power x-ray diffractometer [at Central Connecticut State University]; a spectrophotometer and spectrofluorimeter [at Eastern Connecticut State University; and a Raman Spectrometer [at Western Connecticut State University]. DOE's funding was allocated for purchase and installation of this scientific equipment and instrumentation. Subsequently, DOE funding was allocated to fund the curriculum, faculty development and travel necessary to continue development and implementation of the System's Graduate Certificate in Nanotechnology (GCNT) program and the ConnSCU Nanotechnology Center (ConnSCU-NC) at Southern Connecticut State University. All of the established outcomes have been successfully achieved. The courses and structure of the GCNT program have been determined and the program will be completely implemented in the fall of 2013. The instrumentation has been purchased, installed and has been utilized at each campus for the implementation of the nanotechnology courses, CSUS GCNT and the ConnSCU-NC. Additional outcomes for this grant include curriculum development for non-majors as well as faculty and student research.

  18. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  19. Effects of Vacation Rental Websites on the Concentration of Tourists—Potential Environmental Impacts. An Application to the Balearic Islands in Spain

    Science.gov (United States)

    Rodriguez Martín, José Antonio; Zermeño Mejía, Karla Aída; Salinas Fernández, José Antonio

    2018-01-01

    The concentration of tourists at certain times of the year can damage sensitive environments. The use of peer-to-peer vacation rental websites has increased greatly during the last decade. This system could either reduce seasonality in touristic destinations where the tourist activity takes place throughout the year at a lower price or on the contrary, it could increase the number of visitors at certain times of the year even more. This paper intends to analyze the effect that these platforms have on tourism seasonality in order to calculate if they help reduce or increase the pressure on the destinations. To do so, the Gini Index has been applied to one of the main touristic spots in Europe, the Balearic Islands in Spain. The conclusion is that this type of accommodation has aggravated the problem, generating a greater concentration of tourists and a higher pressure on the resources of the islands. PMID:29462863

  20. Medicare Program; End-Stage Renal Disease Prospective Payment System, Coverage and Payment for Renal Dialysis Services Furnished to Individuals With Acute Kidney Injury, End-Stage Renal Disease Quality Incentive Program, Durable Medical Equipment, Prosthetics, Orthotics and Supplies Competitive Bidding Program Bid Surety Bonds, State Licensure and Appeals Process for Breach of Contract Actions, Durable Medical Equipment, Prosthetics, Orthotics and Supplies Competitive Bidding Program and Fee Schedule Adjustments, Access to Care Issues for Durable Medical Equipment; and the Comprehensive End-Stage Renal Disease Care Model. Final rule.

    Science.gov (United States)

    2016-11-04

    This rule updates and makes revisions to the End-Stage Renal Disease (ESRD) Prospective Payment System (PPS) for calendar year 2017. It also finalizes policies for coverage and payment for renal dialysis services furnished by an ESRD facility to individuals with acute kidney injury. This rule also sets forth requirements for the ESRD Quality Incentive Program, including the inclusion of new quality measures beginning with payment year (PY) 2020 and provides updates to programmatic policies for the PY 2018 and PY 2019 ESRD QIP. This rule also implements statutory requirements for bid surety bonds and state licensure for the Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) Competitive Bidding Program (CBP). This rule also expands suppliers' appeal rights in the event of a breach of contract action taken by CMS, by revising the appeals regulation to extend the appeals process to all types of actions taken by CMS for a supplier's breach of contract, rather than limit an appeal for the termination of a competitive bidding contract. The rule also finalizes changes to the methodologies for adjusting fee schedule amounts for DMEPOS using information from CBPs and for submitting bids and establishing single payment amounts under the CBPs for certain groupings of similar items with different features to address price inversions. Final changes also are made to the method for establishing bid limits for items under the DMEPOS CBPs. In addition, this rule summarizes comments on the impacts of coordinating Medicare and Medicaid Durable Medical Equipment for dually eligible beneficiaries. Finally, this rule also summarizes comments received in response to a request for information related to the Comprehensive ESRD Care Model and future payment models affecting renal care.

  1. 41 CFR 101-25.109-1 - Identification of idle equipment.

    Science.gov (United States)

    2010-07-01

    ... comprised of senior program management, property management, and scientific personnel who are familiar with... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Identification of idle equipment. 101-25.109-1 Section 101-25.109-1 Public Contracts and Property Management Federal Property...

  2. A generalized development model for testing GPS user equipment

    Science.gov (United States)

    Hemesath, N.

    1978-01-01

    The generalized development model (GDM) program, which was intended to establish how well GPS user equipment can perform under a combination of jamming and dynamics, is described. The systems design and the characteristics of the GDM are discussed. The performance aspects of the GDM are listed and the application of the GDM to civil aviation is examined.

  3. The Petroleum Handling Equipment Research and Development Program of the Department of the Army

    National Research Council Canada - National Science Library

    1956-01-01

    .... The various Technical Services have made very significant progress in the development of improved equipment and techniques for storing, transporting, dispensing and testing fuels and lubricants...

  4. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2001-01-01

    Full text: The activity of ZdAJ in 2000 was focused on realisation of the Government-Ordered Project - 6/15 MeV Accelerator. The realisation was accomplished in two stages: - stage I should result in deriving principal operational parameters of the accelerator - stage 2 will result in full implementation of the control system providing optimum control of the equipment and automatic maintaining of its parameters. Within the frames of the first stage, a klystron modulator panel was finished and the design documentation of the mechanical supporting structure, the arm, accelerating structure, collimator and control panel were advanced. Manufacturing of the above sub-units in the workshop has started. In the frames of the Specific Project of the State Committee for Scientific Research, the improvement of Neptun lOPC accelerator was undertaken. The read-out of the monitor dose with atmospheric pressure and ambient temperature compensation has been introduced. New filters for equalising the photon and electron beam and new wedge filters have been designed. Changes in programming have been introduced, which improve the patient's safety by eliminating possible personnel errors and increase the accuracy of radiation fields read-out. In 2000 ZdAJ progressed in development of the Quality System conforming EN-ISO 9001 Standard by including the provisions of EN 46001 Standard. The Standard EN 46001: ''Quality Systems - Medical Equipment''. Detailed requirements related to application of EN ISO 9001 is an European Quality Standard extending the provisions of EN ISO 9001 Standard over the manufacturers of medical equipment. (author)

  5. Mid-market transformation programs: programs to promote best practices in system specification and installation

    International Nuclear Information System (INIS)

    Rosenberg, Mitchell

    2003-01-01

    This paper summarizes the experience of programs designed to promote the adoption of best practices in equipment specification and installation among distributors and installation contractors in the residential central air conditioning and industrial compressed air equipment markets. For each of those markets, the paper identifies the current understanding of best practices, characterizes energy savings available from their adoption, assesses the nature of barriers to their adoption, and describes the operations and accomplishments of programs designed to address those barriers

  6. Using PHM to measure equipment usable life on the Air Force's next generation reusable space booster

    Science.gov (United States)

    Blasdel, A.

    The U.S. Air Force procures many launch vehicles and launch vehicle services to place their satellites at their desired location in space. The equipment on-board these satellite and launch vehicle often suffer from premature failures that result in the total loss of the satellite or a shortened mission life sometimes requiring the purchase of a replacement satellite and launch vehicle. The Air Force uses its EELV to launch its high priority satellites. Due to a rise in the cost of purchasing a launch using the Air Force's EELV from 72M in 1997 to as high as 475M per launch today, the Air Force is working to replace the EELV with a reusable space booster (RSB). The RSB will be similar in design and operations to the recently cancelled NASA reusable space booster known as the Space Shuttle. If the Air Force uses the same process that procures the EELV and other launch vehicles and satellites, the RSB will also suffer from premature equipment failures thus putting the payloads at a similar high risk of mission failure. The RSB is expected to lower each launch cost by 50% compared to the EELV. The development of the RSB offers the Air Force an opportunity to use a new reliability paradigm that includes a prognostic and health management program and a condition-based maintenance program. These both require using intelligent, decision making self-prognostic equipment The prognostic and health management program and its condition-based maintenance program allows increases in RSB equipment usable life, lower logistics and maintenance costs, while increasing safety and mission assurance. The PHM removes many decisions from personnel that, in the past resulted in catastrophic failures and loss of life. Adding intelligent, decision-making self-prognostic equipment to the RSB will further decrease launch costs while decreasing risk and increasing safety and mission assurance.

  7. Seismic and environmental qualification of class IE equipment manufactured in Spain

    International Nuclear Information System (INIS)

    Gerini, P.; Lumbreras, A.; Naredo, F.

    1978-01-01

    Nuclear power plant instrumentation and control design is affected by several factors such as various plant operating conditions, transient response capability, safety requirements and changes in IEEE standards. Recent upgraded IEEE standards that call for Qualification of all Safety related I anc C equipment, namely IEEE 323 (Qualifying Class IE Electric Equipment for nuclear power generating stations) and its daughter Standard IEEE 344 (Recommended Practices for Seismic Qualification of Class IE Equipment for nuclear power generating stations) have been endorsed by the United States Nuclear Regulatory Commission through the issuance of corresponding Regulatory Guides. The author describes the Qualification requirements applicable to the Class IE I and C Components made in Spain for the different vintages of plants, and the programs implemented or plans established by Westinghouse to fulfill those requirements. (author)

  8. Dimensioning of the rolling railway equipment; Dimensionnement du materiel roulant ferroviaire

    Energy Technology Data Exchange (ETDEWEB)

    Chapas, P.; Petit, J.M. [ALSTOM Transport, 93 - Saint Ouen (France)

    2005-01-01

    This article analyzes the specificities of the rolling railway equipment in terms of exploitation. The suitable solutions must satisfy different constraints (load, trip, time, cost..). These theoretical aspects are illustrated with a practical example of dimensioning of a locomotive. Finally, a brief overview of the most recent existing equipments worldwide is given: 1 - traction program and different types of exploitation: load drawn, trip-type, timing, different kinds of exploitation; 2 - dimensioning criteria and motive architecture: constraints, number and distribution of driving axles, power and strain-speed characteristic, efficiency and losses, autonomy, auxiliary equipments; 3 - braking dimensioning: strains involved and braking types, electrical braking, electro-pneumatic braking; 4 - adaptation to the type of exploitation: locomotive for long-distance trips, high-speed trains, inter-urban trains, subway and tramway; 5 - conclusion. (J.S.)

  9. Industrial Technology Modernization Program. Project 44. Modernize Facility Equipment and Processes. Volume 2. Revision 2. Phase 2

    Science.gov (United States)

    1988-05-01

    not be implemented. A change in foreign exchange rates (which increase the equipment cost) and a reduction in marketing forecast resulted in an...project will not be implemented due to unfavorable changes in foreign exchange rates (which increase the equipment costs) and a reduction in market

  10. A model surveillance program based on regulatory experience

    International Nuclear Information System (INIS)

    Conte, R.J.

    1980-01-01

    A model surveillance program is presented based on regulatory experience. The program consists of three phases: Program Delineation, Data Acquistion and Data Analysis. Each phase is described in terms of key quality assurance elements and some current philosophies is the United States Licensing Program. Other topics include the application of these ideas to test equipment used in the surveillance progam and audits of the established program. Program Delineation discusses the establishment of administrative controls for organization and the description of responsibilities using the 'Program Coordinator' concept, with assistance from Data Acquisition and Analysis Teams. Ideas regarding frequency of surveillance testing are also presented. The Data Acquisition Phase discusses various methods for acquiring data including operator observations, test procedures, operator logs, and computer output, for trending equipment performance. The Data Analysis Phase discusses the process for drawing conclusions regarding component/equipment service life, proper application, and generic problems through the use of trend analysis and failure rate data. (orig.)

  11. 76 FR 35023 - Agency Information Collection Activities: Proposed Collection; Comments Requested; Extension of a...

    Science.gov (United States)

    2011-06-15

    ...; Consultants involved with offender population; Medical and mental health services; Vehicle rental/purchase for transport of offenders; Prison Industries; Pre-release/reentry programs; Technology involving offender...

  12. The TMI-2 remote technology program

    International Nuclear Information System (INIS)

    Bengel, P.R.

    1986-01-01

    Since the accident at Three Mile Island Unit 2 (TMI-2), an aggressive approach has been pursued in developing the tools needed for the recovery of the plant. The plant's owner has embarked on a systematic program to develop remote equipment. The program developed conceptual and then physical equipment. The remote reconnaissance vehicles (RRVs) and the remote working vehicle (RWV) span the requirements of the recovery program from the ability to perform radiological and video surveys to heavy-duty decontamination and demolition work. 4 figs

  13. Management system of simple rental flats study based on technical aspect and health in Medan city

    Science.gov (United States)

    Novrial; Indra Cahaya, S.

    2018-03-01

    Medan city is a metropolis city in Sumatera that has slums area. Simple rental flats have been built to overcome the problem. However the preliminary survey result showed that the physical and non-physical environment management of simple rent flats is very bad. This study conducted in 3 simple rent flats. It has observed the simple rent flats environment and has interviewed occupants and related agencies. Results of conducted research showed the occupant’s characteristics based on the largest percentage are Javanese; last education is senior high with self-employed work with average income Rp 1,000,000 – Rp 2,500,000. Waste retribution submitted to their cleanliness except for Amplas simple rent flats, their waste management system does not manage properly and the garbage littered. The number of family members of Wisma Labuhan and Amplas simple rent flats exceeds the regulation number of occupants, so it is crowded and noisy. Physical conditions of Amplas simple rent flats are bad, septic tank is full and are not vacuumed. Clean water sources derived from wells and artesian wll are vulnerable to be contaminated by pollutants such as leachate and bad quality water. It is necessary to improve the physical, basic sanitation, and guidance for the simple rent flats occupants to the management system of Simple Rent Flats.

  14. Evolution of design concepts for remotely maintainable equipment racks

    International Nuclear Information System (INIS)

    Peishel, F.L.; Mouring, R.W.; Schrock, S.L.

    1986-01-01

    Equipment racks have been used to support process equipment in radioactive facilities for many years. Improvements in the design of these racks have evolved relatively slowly primarily as a result of limitations in the capabilities of maintenance equipment; that is, tasks could only be approached from above using bridge cranes with viewing primarily through periscopes. In recent years, however, technological advances have been made by the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) in bridge-mounted servomanipulators with onboard auxiliary hoists and television viewing systems. These advances permit full cell coverage by the manipulator arms which, in turn, allow maintenance tasks to be approached horizontally as well as from above. Maintainable equipment items can be stacked vertically on a rack because total overhead access is less important and maintenance tasks that would not have been attempted in the past can now be performed. These advances permit greater flexibility in the design and cell layout of the racks and lead to concepts that could significantly increase the availability of a facility. The evolution of rack design and a description of the alternative concepts based on present maintenance systems capabilities are presented in this paper. 13 refs., 11 figs

  15. 78 FR 56625 - Housing Counseling Program: New Certification Requirements

    Science.gov (United States)

    2013-09-13

    ... of, and responses to, rental and mortgage delinquency and avoidance of eviction and mortgage default... (including potential economic, environmental, public health, and safety effects, distributive impacts, and.../vol14num3/Cityscape_Nov2012_impact_lim_sellers.pdf , at page 219.) Specific Request for Comment: HUD...

  16. 7 CFR 1150.184 - Patents, copyrights, inventions and publications.

    Science.gov (United States)

    2010-01-01

    ... MARKETING SERVICE (Marketing Agreements and Orders; Milk), DEPARTMENT OF AGRICULTURE DAIRY PROMOTION PROGRAM... the rental, sale, leasing, franchising, or other uses of such patents, copyrights, inventions, or...

  17. 7 CFR 3565.505 - Liability.

    Science.gov (United States)

    2010-01-01

    ... GUARANTEED RURAL RENTAL HOUSING PROGRAM Agency Guaranteed Loans That Back Ginnie Mae Guaranteed Securities... limited to, negligence, fraud, abuse, misrepresentation or misuse of funds, property condition, or...

  18. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  19. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  20. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  1. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  2. Benefits Of Vibration Analysis For Development Of Equipment In HLW Tanks - 12341

    International Nuclear Information System (INIS)

    Stefanko, D.; Herbert, J.

    2012-01-01

    collected during pre-installation tests and screened for: Critical speeds or resonance, Imbalance of rotating parts, Shaft misalignment, Fluid whirl or lubrication break down, Bearing damages, and Other component abnormalities. Examples of previous changes in operating parameters and fabrication tolerances and extension of equipment life resulting from the SRS vibration analysis program include: (1) Limiting operational speeds for some pumps to extend service life without design or part changes; (2) Modifying manufacturing methods (tightening tolerances) for impellers on slurry mixing pumps based on vibration data that indicated hydraulic imbalance; (3) Identifying rolling element mounting defects and replacing those components in pump seals before installation; and (4) Identifying the need for bearing design modification for SRS long-shaft mixing pump designs to eliminate fluid whirl and critical speeds which significantly increased the equipment service life. In addition, vibration analyses and related analyses have been used during new equipment scale-up tests to identify the need for design improvements for full-scale operation / deployment of the equipment in the full size tanks. For example, vibration analyses were recently included in the rotary micro-filtration scale-up test program at SRNL.

  3. BENEFITS OF VIBRATION ANALYSIS FOR DEVELOPMENT OF EQUIPMENT IN HLW TANKS - 12341

    Energy Technology Data Exchange (ETDEWEB)

    Stefanko, D.; Herbert, J.

    2012-01-10

    collected during pre-installation tests and screened for: Critical speeds or resonance, Imbalance of rotating parts, Shaft misalignment, Fluid whirl or lubrication break down, Bearing damages, and Other component abnormalities. Examples of previous changes in operating parameters and fabrication tolerances and extension of equipment life resulting from the SRS vibration analysis program include: (1) Limiting operational speeds for some pumps to extend service life without design or part changes; (2) Modifying manufacturing methods (tightening tolerances) for impellers on slurry mixing pumps based on vibration data that indicated hydraulic imbalance; (3) Identifying rolling element mounting defects and replacing those components in pump seals before installation; and (4) Identifying the need for bearing design modification for SRS long-shaft mixing pump designs to eliminate fluid whirl and critical speeds which significantly increased the equipment service life. In addition, vibration analyses and related analyses have been used during new equipment scale-up tests to identify the need for design improvements for full-scale operation / deployment of the equipment in the full size tanks. For example, vibration analyses were recently included in the rotary micro-filtration scale-up test program at SRNL.

  4. Personal protective equipment use among students with special health care needs reporting injuries in school-sponsored vocational, career, and technical education programs in New Jersey.

    Science.gov (United States)

    Rubenstein, Eric; Shendell, Derek; Eggert, Brain C; Marcella, Stephen W

    2014-01-01

    Students with special health care needs (SHCNs) and individualized education plans (IEPs) may be injured more often in vocational, career, and technical education (CTE) programs. No research to date considers personal protective equipment (PPE) use among students with SHCNs in school-based programs reporting injuries to agencies. Data from 1999 to 2011 on PPE use among injured students in CTE programs in public schools and private secondary schools for the disabled were analyzed; students with SHCNs were distinguished by IEP status within New Jersey Safe Schools surveilance data. Among students with IEPs using PPE, 36% of injuries occurred to body parts PPE was meant to protect. Likely injury types were cuts-lacerations and burns for students with IEPs using PPE and cuts-lacerations and sprains for students with IEPs not using PPE. Females with IEPs using PPE were injured less often than males across ages. Results suggested students with SHCNs with IEPs need further job-related training with increased emphasis on properly selecting and fitting PPE.

  5. 40 CFR Appendix B1 to Subpart F of... - Performance of Refrigerant Recovery, Recycling and/or Reclaim Equipment

    Science.gov (United States)

    2010-07-01

    ... Refrigeration Institute Standard 740-1993. Refrigerant Recovery/Recycling Equipment Section 1. Purpose 1..., Recycling and/or Reclaim Equipment B1 Appendix B1 to Subpart F of Part 82 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling...

  6. Report on equipment availability for the ten-year period, 1966--1975

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This is an annual report of availability and outage statistics for electric power generating facilities operating in the United States. A list of utility organizations voluntarily participating in the EEI Equipment Availability Program in 1975 is located in Appendix F. All summary reports in this publication are for the 10-year period 1966-1975. Each reporting utility company has received reports on individual units for which data were submitted. Also, selected major equipment manufacturers receive copies of computer reports showing an analysis of the data for their equipment. Revised reporting instructions to incorporate Safety and Environmental Requirement Cause Codes were issued effective January 1, 1976. In addition, provisions were made for identifying major equipment manufactured outisde of the United States or under foreign license. Recognizing that an Annual Report contains only a limited amount of general outage data in selected categories, the Task Force has agreed to perform special analyses of the data bank if the cost of computer services is met by the requestor and if the required analysis conforms to some designated policy guidelines.

  7. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    International Nuclear Information System (INIS)

    Husler, R.O.; Weir, T.J.

    1991-01-01

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I ampersand C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified to include process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility

  8. Italy-Japan international project-based learning for developing human resources using design of welfare equipment as a subject.

    Science.gov (United States)

    Hanafusa, A; Komeda, T; Ito, K; Zobel, P Beomonte

    2015-08-01

    Project-based learning (PBL) is effective for developing human resources of young students. The design of welfare equipment, such as wheelchairs and gait assistive devices, is taken as the subject in this study because these devices must be fit to their environment, users, and method of use; students must consider the circumstances of each country concerned. The program commenced in 2012 at L'Aquila, Italy, and the Shibaura Institute of Technology, Japan and has been continuing for three years. Students were divided into four groups and discussions were held on how to adapt the equipment to the user and environment. After discussion, they designed and simulated a model of the equipment using CAD. Finally, they presented their designs to each other. Through the program, students had fruitful discussions, exchanged ideas from different cultures, and learned from each other. Furthermore, friendships among the students were nurtured. It is believed that the objective of the program was satisfactorily accomplished.

  9. Recent developments in methodology for dynamic qualification of nuclear plant equipment

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-01-01

    Dynamic qualification of nuclear plant electrical and mechanical equipment is performed basically under guidelines given in IEEE Standards 323 and 344, and a variety of NRC regulatory guides. Over the last fifteen years qualification methodology prescribed by these documents has changed significantly as interpretations, equipment capability, and imagination of the qualification engineers have progressed. This progress has been sparked by concurrent NRC and industry sponsored research programs that have identified anomalies and developed new methodologies for resolving them. Revisions of the standards have only resulted after a lengthy debate of all such new information and subsequent judgment of its validity. The purpose of this paper is to review a variety of procedural improvements and developments in qualification methodology that are under current consideration as revisions to the standards. Many of the improvements and developments have resulted from recent research programs. All are very likely to appear in one type of standard or another in the near future

  10. 24 CFR 203.42 - Rental properties.

    Science.gov (United States)

    2010-04-01

    ... DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES SINGLE... rented or offered for rent for transient or hotel purposes, as defined in § 203.16, so long as the...

  11. The Tanzania experience: clinical laboratory testing harmonization and equipment standardization at different levels of a tiered health laboratory system.

    Science.gov (United States)

    Massambu, Charles; Mwangi, Christina

    2009-06-01

    The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.

  12. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  13. US-Japan Cooperative Program on neutron scattering

    International Nuclear Information System (INIS)

    Wilkinson, M.K.; Blume, M.; Stevens, D.K.; Iizumi, M.; Yamada, Y.

    1987-01-01

    The US-Japan Cooperative Program on Neutron Scattering was implemented through arrangements by the United States Department of Energy with the Science and Technology Agency (STA) and the Ministry of Science, Education, and Culture (Monbusho) of Japan. It involves research collaboration in neutron scattering by Japanese scientists with scientists at Oak Ridge National Laboratory (ORNL) and Brookhaven National Laboratory (BNL) and the construction of new neutron scattering equipment at both laboratories with funds provided by the Japanese government. The United States provides neutrons in exchange for the new equipment, and other costs of the program are equally shared by the two countries. The assignments of Japanese scientists to ORNL and BNL vary in length, but they correspond to about two person years annually at each laboratory. An equal number of US scientists also participate in the research program. The main research collaboration is centered around the new equipment provided by the Japanese, but other facilities are utilized when they are needed. The new equipment includes a new type of wide-angle diffractometer and equipment for maintaining extreme sample environments at ORNL and a sophisticated polarized-beam triple-axis spectrometer at BNL. 13 refs., 3 figs

  14. Process equipment data organisation in CERN PS controls

    International Nuclear Information System (INIS)

    Casalegno, L.; Cuperus, J.; Sicard, C.H.

    1990-01-01

    The CERN PS control system has a widely distributed architecture, mainly for fast response in a real-time environment. The organisation of the data for equipment access must be compatible with this architecture and give efficient program access to the data. Moreover, it must also offer managerial features such as data integrity, easy backup and restoration, adaptibility to changes in data structure, initialisation, data-entry facilities and automatic documentation. This paper shows how one can take advantage of a commercial data-base management system with its associated tools, adding to it some object-oriented programming concepts to meet the objectives of a manageable distributed data organisation having good run-time performance features and using a reasonable manpower investment. (orig.)

  15. SLOPE STABILITY EVALUATION AND EQUIPMENT SETBACK DISTANCES FOR BURIAL GROUND EXCAVATIONS

    Energy Technology Data Exchange (ETDEWEB)

    MCSHANE DS

    2010-03-25

    After 1970 Transuranic (TRU) and suspect TRU waste was buried in the ground with the intention that at some later date the waste would be retrieved and processed into a configuration for long term storage. To retrieve this waste the soil must be removed (excavated). Sloping the bank of the excavation is the method used to keep the excavation from collapsing and to provide protection for workers retrieving the waste. The purpose of this paper is to document the minimum distance (setback) that equipment must stay from the edge of the excavation to maintain a stable slope. This evaluation examines the equipment setback distance by dividing the equipment into two categories, (1) equipment used for excavation and (2) equipment used for retrieval. The section on excavation equipment will also discuss techniques used for excavation including the process of benching. Calculations 122633-C-004, 'Slope Stability Analysis' (Attachment A), and 300013-C-001, 'Crane Stability Analysis' (Attachment B), have been prepared to support this evaluation. As shown in the calculations the soil has the following properties: Unit weight 110 pounds per cubic foot; and Friction Angle (natural angle of repose) 38{sup o} or 1.28 horizontal to 1 vertical. Setback distances are measured from the top edge of the slope to the wheels/tracks of the vehicles and heavy equipment being utilized. The computer program utilized in the calculation uses the center of the wheel or track load for the analysis and this difference is accounted for in this evaluation.

  16. Slope Stability Evaluation And Equipment Setback Distances For Burial Ground Excavations

    International Nuclear Information System (INIS)

    Mcshane, D.S.

    2010-01-01

    After 1970 Transuranic (TRU) and suspect TRU waste was buried in the ground with the intention that at some later date the waste would be retrieved and processed into a configuration for long term storage. To retrieve this waste the soil must be removed (excavated). Sloping the bank of the excavation is the method used to keep the excavation from collapsing and to provide protection for workers retrieving the waste. The purpose of this paper is to document the minimum distance (setback) that equipment must stay from the edge of the excavation to maintain a stable slope. This evaluation examines the equipment setback distance by dividing the equipment into two categories, (1) equipment used for excavation and (2) equipment used for retrieval. The section on excavation equipment will also discuss techniques used for excavation including the process of benching. Calculations 122633-C-004, 'Slope Stability Analysis' (Attachment A), and 300013-C-001, 'Crane Stability Analysis' (Attachment B), have been prepared to support this evaluation. As shown in the calculations the soil has the following properties: Unit weight 110 pounds per cubic foot; and Friction Angle (natural angle of repose) 38 o or 1.28 horizontal to 1 vertical. Setback distances are measured from the top edge of the slope to the wheels/tracks of the vehicles and heavy equipment being utilized. The computer program utilized in the calculation uses the center of the wheel or track load for the analysis and this difference is accounted for in this evaluation.

  17. Programming for controlling of pulse radiolysis setup. Program RADIO96

    International Nuclear Information System (INIS)

    Mirkowski, J.; Grodkowski, J.

    1998-01-01

    Program RADIO96 was written in Pascal using DELPHI 1.0 (Borland) programming platform. It can operate on IBM PC compatible computers in WINDOWS 3x or WINDOWS'95 environment. The program is dedicated to the pulse radiolysis setup based on the linear electron accelerator LAE 13/9 of the Department of Radiation Chemistry and Technology of the INCT. This work was based on apparatus and results described before and also on programming manuals of used equipment and technical data of programming platform. (author)

  18. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  19. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  20. Mapping of the radiation field of a mammography equipment using molybdenum and rhodium filters

    International Nuclear Information System (INIS)

    Barreira, Jacqueline S.; Campos, Daniela; Vivolo, Vitor

    2014-01-01

    The use of X rays for diagnostic radiology is very common and important to Medicine, including mammographic diagnosis focusing decreasing of the doses applied to the patients and preserving high quality of the diagnostic image. A quality control program of the irradiation systems it is very necessary. The Instruments Calibration Laboratory (LCI) of IPEN perform calibration in dosemeters used in radiation dosimetry (in diagnostic radiology) for many years. The objective of that paper is determining the point of greatest intensity of the beam issued by the mammography equipment. Exposures were made with filters Rhodium and Molybdenum. That mapping is important before applied a routine quality control program of the mammography equipment and the calibration of instruments in the diagnosis. (author)

  1. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  2. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  3. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  4. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  5. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  6. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  7. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  8. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  9. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  10. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  11. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  12. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  13. Optimal selection of major equipment in dual purpose plants

    International Nuclear Information System (INIS)

    Gabbrielli, E.

    1981-01-01

    Simulation of different operational conditions with the aid of a computer program is one of the best ways of assisting decision-makers in the selection of the most economic mix of equipment for a dual purpose plant. Using this approach this paper deals with the economic comparison of plants consisting of MSF desalinators and combustion gas or back pressure steam turbines coupled to low capacity electric power generators. The comparison is performed on the basis of the data made available by the OPTDIS computer program and the results are given in terms of yearly cost of production as the sum of capital, manpower, maintenance, fuel and chemical costs. (orig.)

  14. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  15. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  16. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  17. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  18. The effect of smoke from plastics on digital communications equipment

    International Nuclear Information System (INIS)

    Tanaka, T.J.; Chapin, J.T.

    1998-01-01

    Smoke from plastics can cause immediate problems in electrical equipment in the form of shorting and increased leakage currents, as well as long-term corrosion (metal loss). The short-term problems can be especially serious for critical control instrumentation such as that found in nuclear reactors or telecommunications systems. The US Nuclear Regulatory Commission and Sandia National Laboratories are sponsoring a program to determine the modes and probabilities of digital equipment failure during exposure to smoke and up to 24 hours after the exposure. Early tests on computer systems have shown that the most common immediate problems are temporary and are likely to be caused by increased leakage currents. High-voltage circuits are especially vulnerable since the charged particles in smoke are drawn to those surfaces. To study failure probabilities, smoke exposure tests with real-time measurements will be carried out to determine how the electrical properties of the environment are affected by smoke concentration and content. Digital communication cable will be included in the tests because temporary shorts that cannot be detected through dc measurements may cause interruptions in communications between computers. The reaction of the equipment to changed electrical properties of the environment will be modeled. Equipment that can be used for testing and modeling is being solicited

  19. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  20. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  1. Equipment to weld fuel rods of mixed oxides

    International Nuclear Information System (INIS)

    Aparicio, G.; Orlando, O.S.; Olano, V.R.; Toubes, B.; Munoz, C.A.

    1987-01-01

    Two welding outfits system T1G were designed and constructed to weld fuel rods with mixed oxides pellets (uranium and plutonium). One of them is connected to a glove box where the loading of sheaths takes place. The sheaths are driven to the welder through a removable plug pusher in the welding chamber. This equipment was designed to perform welding tests changing the parameters (gas composition and pressure, welding current, electrode position, etc.). The components of the welder, such as plug holder, chamber closure and peripheral accessories, were designed and constructed taking into account the working pressures in the machine, which is placed in a controlled area and connected to a glove box, where special safety conditions are necessary. The equipment to weld fuel bars is complemented by another machine, located in cold area, of the type presently used in the fuel elements factory. This equipment has been designed to perform some welding operations in sheaths and mixed oxide rods of the type Atucha I and II. Both machines have a programmed power supply of wide range and a vacuum, and pressurizing system that allows the change of parameters. Both systems have special features of handling and operation. (Author)

  2. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  3. IEEE Std 323-1983: IEEE standard for qualifying Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic requirements for qualifying Class 1E equipment with interfaces that are to be used in nuclear power generating stations. The requirements presented include the principles, procedures, and methods of qualification. These qualification requirements, when met, will confirm the adequacy of the equipment design under normal, abnormal, design basis event, post design basis event, and in-service test conditions for the performance of safety function(s). The purpose of this standard is to identify requirements for the qualification of Class 1E equipment, including those interfaces whose failure could adversely affect the performance of Class 1E equipment and systems. The methods described shall be used for qualifying equipment, extending qualification, and updating qualification if the equipment is modified. Other issued IEEE standards which present qualification methods for specific equipment or components, or both, and those that deal with parts of the qualification program, may be used to supplement this standard, as applicable

  4. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  5. Shuttle orbiter Ku-band radar/communications system design evaluation. Deliverable test equipment evaluation

    Science.gov (United States)

    Maronde, R. G.

    1980-07-01

    The Ku-band test equipment, known as the Deliverable System Test equipment (DSTE), is reviewed and evaluated. The DSTE is semiautomated and computer programs were generated for 14 communication mode tests and 17 radar mode tests. The 31 test modules provide a good cross section of tests with which to exercise the Ku-band system; however, it is very limited when being used to verify Ku-band system performance. More detailed test descriptions are needed, and a major area of concern is the DSTE sell-off procedure which is inadequate.

  6. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  7. Inspector training for VIFM equipment - An integrated approach

    International Nuclear Information System (INIS)

    Truong, Q.S. Bob; Keeffe, R.; Ellacott, T.; Desson, K.; Herber, N.

    2001-01-01

    Full text: The VXI Integrated Fuel Monitor (VIFM) was developed by the Canadian Safeguards Support Program (CSSP) as a generic radiation monitor for safeguards applications. The VIFM equipment features a modular design, where a single cabinet can house several instruments such as bundle counters, core discharge monitors, Yes/No monitors, and other devices. VIFM can also be used in a stand-alone, transportable mode, with a detector connected to a single VIFM module linked to a laptop computer. VIFM equipment is currently in use at CANDU nuclear generating stations in several countries. Because each facility may have a different combination of detectors, the training program has been designed to reflect the modular nature of VIFM. Introductory material is generic and applies to any facility. More advanced material is carefully compartmentalized to allow IAEA Inspectors to concentrate their efforts in areas that concern them. Advanced material is available in a just-in-time reference format that simplifies rapid access to detailed information. A number of training resources have been developed, including multimedia and video material on CD-ROMs. This material has been designed to operate on a laptop computer, allowing inspectors to review and refresh their knowledge at any time - for example, during inspection trips. Although each of these resources is useful in its own right, the CSSP is developing an integrated approach to inspector training that combines all of these elements in a new way calculated to produce better training results than in the past. This new training approach features a two-day workshop preceded by a period of CD-ROM-based self-paced study. After the workshop, participants are able to make use of printed and CD-ROM-based reference materials for just-in-time 'refreshers'. Each step in this integrated approach to training will be described in the presentation. Briefly, the steps are as follows. A multimedia computer-based training package is made

  8. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  9. Current state of commercial radiation detection equipment for homeland security applications

    International Nuclear Information System (INIS)

    Klann, R.T.; Shergur, J.; Mattesich, G.

    2009-01-01

    With the creation of the U.S. Department of Homeland Security (DHS) came the increased concern that terrorist groups would attempt to manufacture and use an improvised nuclear device or radiological dispersal device. As such, a primary mission of DHS is to protect the public against the use of these devices and to assist state and local responders in finding, locating, and identifying these types of devices and materials used to manufacture these devices. This assistance from DHS to state and local responders comes in the form of grant money to procure radiation detection equipment. In addition to this grant program, DHS has supported the development of American National Standards Institute standards for radiation detection equipment and has conducted testing of commercially available instruments. This paper identifies the types and kinds of commercially available equipment that can be used to detect and identify radiological material - for use in traditional search applications as well as primary and secondary screening of personnel, vehicles, and cargo containers. In doing so, key considerations for the conduct of operations are described as well as critical features of the instruments for specific applications. The current state of commercial instruments is described for different categories of detection equipment including personal radiation detectors, radioisotope identifiers, man-portable detection equipment, and radiation portal monitors. In addition, emerging technologies are also discussed, such as spectroscopic detectors and advanced spectroscopic portal monitors

  10. Objective masurement of image quality in fluoroscopic x-ray equipment FluoroQuality

    CERN Document Server

    Tapiovaara, M

    2003-01-01

    The report describes FluoroQuality, a computer program that is developed in STUK and used for measuring the image quality in medical fluoroscopic equipment. The method is based on the statistical decision theory (SDT) and the main measurement result is given in terms of the accumulation rate of the signal-to-noise ratio squared (SNR sup 2 sub r sub a sub t sub e). In addition to this quantity several other quantities are measured. These quantities include the SNR of single image frames, the spatio-temporal noise power spectrum and the temporal lag. The measurement method can be used, for example, for specifying the image quality in fluoroscopic images, for optimising the image quality and dose rate in fluoroscopy and for quality control of fluoroscopic equipment. The theory behind the measurement method is reviewed and the measurement of the various quantities is explained. An example of using the method for optimising a specified fluoroscopic procedure is given. The User's Manual of the program is included a...

  11. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  12. A Study on Performance and Safety Tests of Electrosurgical Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2016-09-01

    Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  13. Regulation E 67-13. Opinion of acceptance for the clinical use of medical equipment using radiation

    International Nuclear Information System (INIS)

    2015-01-01

    The objective of this regulation is to establish the regulatory requirements for the granting of the 'Act of Acceptance for the clinical use of radiation Medical Equipment employing' complementing the provisions of the 'Regulations for the Evaluation and State Control of Medical Equipment' and aims help to improve the legal basis of the Regulatory technical Medical Equipment Program. The provisions of this regulation is aimed at any institution of the National Health System, hereinafter applicant required an Opinion of Acceptance for the clinical use of a medical team that uses radiation to authorization of use in humans.

  14. Implications of NUREG-1150 for equipment qualification

    International Nuclear Information System (INIS)

    Siu, R.P.; Sarram, M.

    1988-01-01

    Current USNRC regulations in 10CFR50 requires that structures, systems and components important to safety in a nuclear power plant are to be designed to accommodate the effects of harsh environments associated with potential accidents. Detailed regulatory requirements are as discussed in Regulatory Guide 1.89. Some of these regulatory requirements have been based upon rather outdated understanding of the phenomenology of severe accidents -- e.g., the radiation source terms for equipment qualification can be traced to TID-14844 which was originally published in 1962. Furthermore, the definition of important-to-safety in these regulatory requirements is rather broad, usually resulting in a long Q-list of equipment to be qualified for the design-basis Large LOCA. In the past few years, extensive research/analysis on severe accidents have been conducted -- from the IREP/NREP activities, the IDCOR programs, to the NUREG-1150 efforts. This paper reports that as a result of all these PRA-related activities, a much-improved understanding of the phenomenology and environmental conditions associated with severe accidents has been gained

  15. Testing of wet scrap recovery equipment for mixed oxide scrap reprocessing

    International Nuclear Information System (INIS)

    Demiter, J.A.; Klem, M.J.; Owen, T.J.

    1984-08-01

    The Wet Scrap Recovery (WSR) program was initiated at the Hanford Engineering Development Laboratory (HEDL) by Westinghouse Hanford Company in Richland, Washington to demonstrate fuel fabrication scrap recovery and reconversion to fuel grade oxide powder using the continuous coprecipitation-calcination (COPRECAL) conversion process. Advancements in process control equipment and instrumentation were also developed and demonstrated

  16. Agricultural Equipment Technician: Apprenticeship Course Outline. Apprenticeship and Industry Training. 3212

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2012

    2012-01-01

    The graduate of the Agricultural Equipment Technician apprenticeship program is a certified journeyperson who will be able to: (1) repair, diagnose and maintain by skill and knowledge gained through training and experience any of the working parts of diesel engines as well as the various components of mobile farm machinery; (2) use, competently,…

  17. ER-E4 regulation. Transitional arrangement to implement the rules for evaluating and state control of medical equipment

    International Nuclear Information System (INIS)

    2015-01-01

    Establish a regulatory document where the validity and status of the documents contained in the Regulatory Legal Base Technical Program of medical equipment is exposed, given the scope thereof to comply with the provisions of the Regulation. This regulation is aimed at all subjects (manufacturers or producers, suppliers or distributors, importers, users, medical equipment, as well as health institutions SNS) involved in activities related to the evaluation and control of the State Medical equipment and make use of complementary technical legal documents.

  18. Components of a comprehensive capital equipment planning program.

    Science.gov (United States)

    Gresch, Alan

    2010-01-01

    As you may have already figured out, there is crossover and gaps between all of these capital equipment components. CE often will, and proactively should, make recommendations based on the CE, clinical, and financial components but rarely has direct knowledge of the strategic element. The clinical, finance, and administrative folks likely have visibility to most of these, but may lack full awareness of at least one component. The key is to engage key stakeholders from all these critical areas and develop a process to pull all this information together in one nice, neat package. Defining the person or persons responsible for taking the lead on this in your organization will depend greatly on the organization's type and size. For a single, standalone community hospital, it will likely be the facility administrator. For an integrated delivery network (IDN), a corporate entity, led by supply chain, finance, or both, may take the lead. Your organization may also employ consultative services or software to help facilitate this function. Regardless of who takes the lead, a weighting or scoring system that assigns certain values in all the outlined component categories, is clearly defined, and is easy to understand for all the contributors will need to be developed. If you are unaware or unclear of what the process is, find out and figure out how you can be a vital contributor to the process. This is one more way you can demonstrate the value you and your department bring to your organization.

  19. The Ural Electrochemical Integrated Plant Process for Managing Equipment Intended for Nuclear Material Protection, Control and Accounting System Upgrades

    International Nuclear Information System (INIS)

    Yuldashev, Rashid; Nosov, Andrei; Carroll, Michael F.; Garrett, Albert G.; Dabbs, Richard D.; Ku, Esther M.

    2008-01-01

    Since 1996, the Ural Electrochemical Integrated Plant (UEIP) located in the town of Novouralsk, Russia, (previously known as Sverdlovsk-44) and the United States Department of Energy (U.S. DOE) have been cooperating under the Nuclear Material Protection, Control and Accounting (MPC and A) Program. Because UEIP is involved in the processing of highly enriched uranium (HEU) into low enriched uranium (LEU), and there are highly enriched nuclear materials on its territory, the main goal of the MPC and A cooperation is to upgrade those systems that ensure secure storage, processing and transportation of nuclear materials at the plant. UEIP has completed key upgrades (equipment procurement and installation) aimed at improving MPC and A systems through significant investments made by both the U.S. DOE and UEIP. These joint cooperative efforts resulted in bringing MPC and A systems into compliance with current regulations, which led to nuclear material (NM) theft risk reduction and prevention from other unlawful actions with respect to them. Upon the U.S. MPC and A project team's suggestion, UEIP has developed an equipment inventory control process to track all the property provided through the MPC and A Program. The UEIP process and system for managing equipment provides many benefits including: greater ease and efficiency in determining the quantities, location, maintenance and repair schedule for equipment; greater assurance that MPC and A equipment is in continued satisfactory operation; and improved control in the development of a site sustainability program. While emphasizing UEIP's equipment inventory control processes, this paper will present process requirements and a methodology that may have practical and helpful applications at other sites.

  20. Quality control procedures for equipment: The EORTC radiotherapy group experience

    International Nuclear Information System (INIS)

    Garavaglia, G.; Mijnheer, B.

    1997-01-01

    The QA program of the Radiotherapy Co-operative Group of the EORTC (European Organisation for Research and Treatment of Cancer) has included quality control procedures for equipment from its starting date in 1982. During on-site visits carded out by a team of radiotherapists and physicists the following equipment checks and measurements were performed: mechanical and beam alignment checks of simulator and therapy units; measurements of the dose homogeneity for X-ray and electron beams; intercomparison of ionization chambers; measurements of the depth dose distribution at several depths; absorbed dose determination in specific points in water for several combinations of field sizes and accessories, for photon and electron beams. In addition calculations of treatment time and monitor units were carried out for reference cases and the relevant beam data from all machines in use were collected. In order to provide a follow-up of the on-site visits, a mailed TLD program was then established in 1986. The program has been very successful, the centers are eager to participate since it constitutes an independent check of the measurements performed by the local physicists. It also allows to detect dosimetric problems in centers not yet included in the site visit program. To date, all participating centers have been monitored by mailed TLD, several more than once. This has led to the decision of stopping the site visits unless large deviations cannot be resolved by a second TLD mailing. The Radiation Physics Department of the Goeteborg, University Hospital has been the main partner in this QA effort. Since 1993 the mailed TLD program continues in co-operation with the Institut Gustave Roussy in Villejuif. Besides water phantom measurements on the beam axis, the IGR, in collaboration with the Radiation Physics Center in Houston, is planning a procedure to check off-axis doses by means of a TLD-loaded multi-purpose phantom. (author)