WorldWideScience

Sample records for renovation operation maintenance

  1. Operations and maintenance philosophy

    Energy Technology Data Exchange (ETDEWEB)

    DUNCAN, G.P.

    1999-10-28

    This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

  2. Existing Sustainable Renovation Concepts

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Vanhoutteghem, Lies; Gustavsson, Leif

    there is a great need for full-service packages including consulting, contract work, follow-up, financing and operation and maintenance. There are few Nordic examples of such service models for renovation of single-family houses which entered the market recently. The success of these concepts is yet...

  3. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  4. HVAC controls: Operation and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Gupton, G.W. Jr.

    1987-01-01

    The introductory chapters review HVAC system processes and equipment, control system types and equipment, and equipment-to-control interactions. The succeeding chapters cover specific control systems functions, including electrical interlock and motor starting, electrical and electronic control system diagrams, pneumatic control system diagrams, air supply to pneumatic control systems, and control system maintenance.

  5. Principles of machine operation and maintenance

    CERN Document Server

    Jeffrey, Dick

    2013-01-01

    This book explains how rotating machinery works, and the role of the maintenance engineer in ensuring its proper operation. Stress is laid on the need for the trainee engineer to develop skills in diagnosis and troubleshooting as well as practicalexpertise in maintenance procedures.

  6. Operation and maintenance cost-cutting

    Energy Technology Data Exchange (ETDEWEB)

    Hollingshead, T.W.

    1996-12-31

    This presentation by Timothy W. Hollingshead, Technical Services Manager, Pacific Gas and Electric, is about cutting costs in the Operation and Maintenance phase of geothermal energy production. The necessity of cost control, keeping workers well-trained and avoiding OSHA fines, taking advantages of new technologies, and establishing predictive maintenance programs are some of the issues discussed in this article.

  7. ATLAS Maintenance and Operation management system

    CERN Multimedia

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  8. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  9. Operation and maintenance of offshore wind farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.; Madsen, Erik Skov; Bilberg, Arne

    The offshore wind industry is booming and larger, more efficient wind-turbines have constantly been introduced into the market. However, research within the field of the operation and maintenance (O&M) of offshore wind farms is limited as the field is still immature. In this paper, two current...... maintenance models - RCM and TPM - are discussed in this context. Furthermore, through a case study, the paper looks into Modularization and SSLP, as these concepts can be utilized to optimize maintenance. This is a new approach for the offshore wind industry....

  10. Operation and maintenance of offshore wind farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.; Madsen, Erik Skov; Bilberg, Arne

    The offshore wind industry is booming and larger, more efficient wind-turbines have constantly been introduced into the market. However, research within the field of the operation and maintenance (O&M) of offshore wind farms is limited as the field is still immature. In this paper, two current...... maintenance models - RCM and TPM - are discussed in this context. Furthermore, through a case study, the paper looks into Modularization and SSLP, as these concepts can be utilized to optimize maintenance. This is a new approach for the offshore wind industry....

  11. EIPQR - a new tool for evaluation of maintenance and renovation need; EPIQR - et nyt vaerktoej til vurdering af vedligeholds- og renoveringsbehov

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-11-01

    The article presents a new method for evaluation of the need for maintenance and renovation. Potential measures for energy savings and improvement of indoor climate are also evaluated. The method includes also evaluation of possible measures for energy saving measures and for improvement of the indoor climate. The method is built up as a computer tool and used in diagnosis of buildings, performance analysis of results, and used to prepare alternative scenarios with prices for different solution models and reporting. On basis of the results and an extensive price database the programme gives a description partly of the present condition and partly of the economic consequences of alternative scenarios for renovation, energy saving measures and measures for improvement of the indoor climate. (EHS)

  12. EHV network operation, maintenance, organization and training

    Energy Technology Data Exchange (ETDEWEB)

    Gravier, J.P. [Electricite de France (EDF), 75 - Paris (France)

    1994-12-31

    The service interruptions of electricity have an ever increasing social and industrial impact, it is thus fundamental to operate the network to its best level of performances. To face these changing conditions, Electricite de France has consequently adapted its strategy to improve its organization for maintenance and operation, clarify the operation procedures and give further training to the staff. This work presents the above mentioned issues. (author) 2 figs.

  13. Operation and maintenance in ST-MA

    CERN Document Server

    Nunes, R

    2003-01-01

    This paper will review the Operation & Maintenance (O&M) activities in the ST-MA group, giving an overview of the services provided by the Group as well as the contract activities. As an introduction, a conceptual framework for O&M is proposed in order to better situate the domains of Operation and Maintenance respectively. The ST-MA activities shall be looked at through the three main service axes and special emphasis will be given to the contractual implementation, supervision and follow-up methodology.

  14. 49 CFR 193.2707 - Operations and maintenance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Operations and maintenance. 193.2707 Section 193... and maintenance. (a) Each operator shall utilize for operation or maintenance of components only those... operation or maintenance function; and (3) Acceptable performance on a proficiency test relevant to...

  15. Davis PV plant operation and maintenance manual

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  16. Operating and maintenance experience in tritium environments

    Energy Technology Data Exchange (ETDEWEB)

    Tuer, G.L.

    1987-01-01

    This presentation is a summary of practical experience gained over more than twenty years from analyzing failures of process equipment operated in tritium and deuterium environments. Significant improvements have been achieved in design and procurement of new equipment, testing and selection of materials, and gradually more favorable maintenance experience. Preferred materials and inspection methods are described. 6 tabs.

  17. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  18. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Operation after maintenance, preventive maintenance, rebuilding, or alteration. 91.407 Section 91.407 Aeronautics and Space FEDERAL AVIATION... OPERATING AND FLIGHT RULES Maintenance, Preventive Maintenance, and Alterations § 91.407 Operation...

  19. Guidelines for safe process operations and maintenance

    CERN Document Server

    2010-01-01

    First-line managers have to maintain the integrity of facilities, control manufacturing processes, and handle unusual or emergency situations, as well as respond to the pressures of production demand. On a daily basis, they are closest to the operating personnel who may be injured by a process accident, and they are in the best position to spot problem conditions and to act to contain them. This book offers these managers ""how-to"" information on process safety management program execution in the operations and maintenance departments, recommending technical and administrative process safety

  20. 49 CFR 193.2713 - Training: operations and maintenance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Training: operations and maintenance. 193.2713... Training: operations and maintenance. (a) Each operator shall provide and implement a written plan of initial training to instruct— (1) All permanent maintenance, operating, and supervisory personnel—...

  1. 49 CFR 236.1039 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operations and Maintenance Manual. 236.1039... Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and..., modification, inspection, and testing of the PTC system and have them in one Operations and Maintenance...

  2. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  3. 49 CFR 236.919 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operations and Maintenance Manual. 236.919 Section... for Processor-Based Signal and Train Control Systems § 236.919 Operations and Maintenance Manual. (a... Maintenance Manual, readily available to persons required to perform such tasks and for inspection by FRA...

  4. Optimising agile development practices for the maintenance operation: nine heuristics

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Rose, Jeremy

    2014-01-01

    is therefore a trivial endeavour - the maintenance operation differs in some important respects from development work. Classical accounts of software maintenance emphasise more traditional software engineering processes, whereas recent research accounts of agile maintenance efforts uncritically focus......Agile methods are widely used and successful in many development situations and beginning to attract attention amongst the software maintenance community – both researchers and practitioners. However, it should not be assumed that implementing a well-known agile method for a maintenance department...

  5. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter;

    2015-01-01

    Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs...... and maintenance costs estimations for wave energy converter applications including real weather data and damage accumulation. Furthermore, uncertainties related with costs, structural damage accumulation, inspection accuracy and different maintenance strategies can be included. This article contains a case study...

  6. The Line Operations Safety Audit Program: Transitioning From Flight Operations to Maintenance and Ramp Operations

    Science.gov (United States)

    2011-09-01

    A Line Operations Safety Audit ( LOSA ) is a voluntary safety program that collects safety data during normal airline operations and was originally...maintenance and ramp operations. This report provides a review of the use of LOSA , discusses LOSA’s essential operating characteristics, lessons learned on...the flight deck, and describes the extension of LOSA to maintenance and ramp operations. The research team developed tools for airlines and

  7. HOTEL MAINTENANCE MANAGEMENT : Strategic practices in hotel operation

    OpenAIRE

    Aryee, Susan

    2011-01-01

    Purpose The purpose is to identify responsibility of owners and operators for maintenance of assets, fixtures and fittings, to identify maintenance management strategies adopted for the efficient operation of hotels and to find out difficulties faced by operators in implementing these strategies. Methodology Four interviews provided supplementary data for the main data collection phase involving administration of 64 questionnaires to hotel operators and maintenance managers. Findings The hote...

  8. TRUPACT-II Operating and Maintenance Instructions

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse Electric Corporation, Waste Isolation Division

    1999-12-31

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1

  9. A modified operational sequence methodology for zoo exhibit design and renovation: conceptualizing animals, staff, and visitors as interdependent coworkers.

    Science.gov (United States)

    Kelling, Nicholas J; Gaalema, Diann E; Kelling, Angela S

    2014-01-01

    Human factors analyses have been used to improve efficiency and safety in various work environments. Although generally limited to humans, the universality of these analyses allows for their formal application to a much broader domain. This paper outlines a model for the use of human factors to enhance zoo exhibits and optimize spaces for all user groups; zoo animals, zoo visitors, and zoo staff members. Zoo exhibits are multi-faceted and each user group has a distinct set of requirements that can clash or complement each other. Careful analysis and a reframing of the three groups as interdependent coworkers can enhance safety, efficiency, and experience for all user groups. This paper details a general creation and specific examples of the use of the modified human factors tools of function allocation, operational sequence diagram and needs assessment. These tools allow for adaptability and ease of understanding in the design or renovation of exhibits.

  10. 40 CFR 1033.815 - Maintenance, operation, and repair.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Maintenance, operation, and repair... Maintenance, operation, and repair. All persons who own, operate, or maintain locomotives are subject to this... components of the diagnostics system itself. For most repairs, this paragraph (b) requires that...

  11. 14 CFR 171.115 - Maintenance and operations requirements.

    Science.gov (United States)

    2010-01-01

    ... Facility (SDF) § 171.115 Maintenance and operations requirements. (a) The owner of the facility shall... procedures and the use of specialized test equipment. (b) The SDF must be designed and maintained so that the... within the facility that may adversely affect SDF operations. (2) Maintenance and operations...

  12. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  13. 24 CFR 1006.325 - Maintenance, management and efficient operation.

    Science.gov (United States)

    2010-04-01

    ... § 1006.325 Maintenance, management and efficient operation. (a) Written policies. The DHHL must develop... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maintenance, management and efficient operation. 1006.325 Section 1006.325 Housing and Urban Development Regulations Relating to...

  14. Applying principles of Design For Assembly to ITER maintenance operations

    NARCIS (Netherlands)

    Heemskerk, C.; Baar, M.de; Elzendoorn, B.; Koning, J.; Verhoeven, T.; Vreede, F.de

    2009-01-01

    In ITER, maintenance operations in the vessel and in the Hot Cell will be largely done by Remote Handling (RH). Remotely performed maintenance actions tend to be more time-costly than actions performed by direct human access. With a human operator in the control loop and adequate situational feedbac

  15. 24 CFR 882.516 - Maintenance, operation and inspections.

    Science.gov (United States)

    2010-04-01

    ... PERSONS WITH DISABILITIES PROGRAM) SECTION 8 MODERATE REHABILITATION PROGRAMS Special Procedures for Moderate Rehabilitation-Program Development and Operation § 882.516 Maintenance, operation and inspections... OF HOUSING AND URBAN DEVELOPMENT (SECTION 8 HOUSING ASSISTANCE PROGRAMS, SECTION 202 DIRECT...

  16. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  17. Final Environmental Assessment for Aircraft Maintenance Operations Center

    Science.gov (United States)

    2014-06-01

    Historic Preservation Act AIRFA American Indian Religious Freedom Act AMC Aircraft Maintenance Contractor AMOC Aircraft Maintenance Operations...this document. Table 1-1 Applicable Environmental Laws and Regulations Federal Statutes and Policies American Indian Religious Freedom Act (AIRFA...Larks (Eremophila alpestris), Common Grackle (Quiscula quiscala), American Crow (Corvus brachyrhynchos), Turkey Vulture (Cathartes aura), Black Vulture

  18. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...... and illustrated by an example, namely for planning of inspections and maintenance of wind turbine blades. A life-cycle approach is used where the total expected cost in the remaining lifetime is minimized. This maintenance plan is continuously updated during the lifetime using information from previous...... inspections and from condition monitoring with time intervals between inspections and maintenance / repair options as the decision parameters....

  19. EFAB Report: Green Infrastructure Operations and Maintenance Finance

    Science.gov (United States)

    In this report, EFAB defines green infrastructure, outlines the benefits of green infrastructure, introduces green infrastructure operations and maintenance costs, and identifies and evaluates diverse ways to fund/finance green infrastructure O&M costs.

  20. Constraints to private sector operation: maintenance of municipal infrastructure

    CSIR Research Space (South Africa)

    Wall, K

    2012-08-01

    Full Text Available This paper discusses the potential of the private sector to take medium- or longterm responsibility for the operation and/or maintenance of elements of infrastructure owned by municipalities....

  1. Innovative water service operation and maintenance: exploration of franchising partnerships

    CSIR Research Space (South Africa)

    Wall, K

    2008-10-01

    Full Text Available WRC and CSIR research has found that franchising partnerships could alleviate and address many challenges in the operation and maintenance of water services infrastructure. Franchising brings appropriate training to those on-site, and also offers...

  2. Franchising partnerships for roads engineering infrastructure operation and maintenance

    CSIR Research Space (South Africa)

    Wall, K

    2008-07-01

    Full Text Available This is a presentation delivered at the 27th SATC (Southern African Transport Conference) conference 2008, focusing on franchising principles and applying these principles to water services infrastructure, operation and maintenance...

  3. Functional Problems and Maintenance Operations of Hydraulic Turbines

    Directory of Open Access Journals (Sweden)

    Liliana Topliceanu

    2016-02-01

    Full Text Available The exploitation in good conditions of the hydroelectric power plant imposes a rigorous maintenance of equipment and operating facilities, primarily of the turbine. The efficiency of the turbine is strongly affected by any defects which could occur during the operation. The paper makes a synthesis of the most frequent failures which have occurred during the functioning of Kaplan turbines plant and the required maintenance plan that has to be adopted. The maintenance rules for the optimal working of these turbines are also emphasized.

  4. Risk-based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2009-01-01

    , wear and erosion are associated with significant uncertainty. Observations of the degree of damage can increase the reliability of predictions, especially in connection with condition-based maintenance. The approach can be used for gearboxes, generators, cracks, corrosion, etc. The paper also describes......For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based lifecycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue, corrosion...

  5. Radio Frequency Identification in Construction Operation and Maintenance

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld

    and maintenance. Research results from a contextual design process are presented and supplemented with practical experiences from implementing an RFID-supported operation and maintenance system. The greatest obstacles for successful implementation of RFID-based O&M systems have been found in structuring working...... and access control. Recently maintenance applications have been proposed to hold the trigger needed to launch RFID more widely in the construction sector. Therefore the purpose of the research presented in this paper is to identify the actual user needs for automatic identification in construction operation...... processes and information rather than in making the hardware work....

  6. Operation and maintenance results from ISFOC CPV plants

    Science.gov (United States)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  7. The Development and Deployment of a Maintenance Operations Safety Survey.

    Science.gov (United States)

    Langer, Marie; Braithwaite, Graham R

    2016-11-01

    Based on the line operations safety audit (LOSA), two studies were conducted to develop and deploy an equivalent tool for aircraft maintenance: the maintenance operations safety survey (MOSS). Safety in aircraft maintenance is currently measured reactively, based on the number of audit findings, reportable events, incidents, or accidents. Proactive safety tools designed for monitoring routine operations, such as flight data monitoring and LOSA, have been developed predominantly for flight operations. In Study 1, development of MOSS, 12 test peer-to-peer observations were collected to investigate the practicalities of this approach. In Study 2, deployment of MOSS, seven expert observers collected 56 peer-to-peer observations of line maintenance checks at four stations. Narrative data were coded and analyzed according to the threat and error management (TEM) framework. In Study 1, a line check was identified as a suitable unit of observation. Communication and third-party data management were the key factors in gaining maintainer trust. Study 2 identified that on average, maintainers experienced 7.8 threats (operational complexities) and committed 2.5 errors per observation. The majority of threats and errors were inconsequential. Links between specific threats and errors leading to 36 undesired states were established. This research demonstrates that observations of routine maintenance operations are feasible. TEM-based results highlight successful management strategies that maintainers employ on a day-to-day basis. MOSS is a novel approach for safety data collection and analysis. It helps practitioners understand the nature of maintenance errors, promote an informed culture, and support safety management systems in the maintenance domain. © 2016, Human Factors and Ergonomics Society.

  8. Use of the virtual reality in maintenance operation at EDF

    Energy Technology Data Exchange (ETDEWEB)

    Nouailhas, B.; Tonnoir, S.; Laureillard, P. [EDF R and D, 1 avenue du General de Gaulle, 92141 Clamart Cedex (France)

    2006-07-01

    Today, a high level of availability for generating facilities is essential for electricity producers. In this context, optimizing the maintenance operation tasks is a necessity for EDF. To achieve this objective, EDF R and D has created the 3D Maintenance Project. The main goal of this project is to provide an organization and work methods linked with a 3D tool to support the maintenance staff in their tasks of coordination and moving packages during outages. In this paper present the moving packages tool and its experimentation in a nuclear power plant. (authors)

  9. Maintenance Operations Degradation of Airfield Pavement Markings

    Science.gov (United States)

    2012-03-01

    grinding. High pressure water rubber removal consists of using jets of water up to 15,000 psi to cut through and lift rubber off of the runway...operations. The ETL allows for several different rubber removal methods to include: high pressure water , chemical detergent, high velocity abrasion , and...while a sweeper and water wash the solution off of the runway surface. High velocity abrasion uses the same principle as high pressure water , but

  10. Machine-Tractor Aggregates Operation Assurance by Mobile Maintenance Teams

    Science.gov (United States)

    Redreev, G. V.; Myalo, O. V.; Prokopov, S. P.; Solomkin, A. P.; Okunev, G. A.

    2017-07-01

    operability of machine-tractor aggregates (MTA) is ensured by purposeful activity of maintenance and repair performers. MTAs operation assurance can provide achievement of absolutely different goals. For further development of technical service formation concept concretization in the part of determining locations of maintenance and repair performers and their area of expertise is suggested, as well as of arising peculiarities of equipment. The theoretical task is reduced to the type of tasks of distribution of recourses or transportation tasks. Mobile maintenance teams of regional agricultural equipment manufacturers’ dealers have experience of technical service performance. The formed stream of requests from agricultural plants determines the direction of correcting of existing theoretical provisions, confirming necessity of further development of centralized method of technical service by efforts and means of manufacturers’ dealers.

  11. Design of casks: incorporating operational feedback from maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bimet, F.; Hartenstein, M. [COGEMA Logistics, Saint Quentin (France)

    2004-07-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible.

  12. Operations and Maintenance Manual, Atmospheric Contaminant Sensor, Revision B.

    Science.gov (United States)

    National Aeronautics and Space Administration, Washington, DC.

    The sensor is a mass spectrometer system which continuously monitors the atmospheric constituents of hydrogen, water vapor, nitrogen, oxygen, and carbon dioxide, and monitors the Freons on a demand sampling basis. The manual provides a system description, operational procedures, and maintenance and troubleshooting instructions. Circuit diagrams…

  13. SCOPE : an intelligent maintenance system for supporting crew operations

    NARCIS (Netherlands)

    Bos, A.; Breebaart, L.; Neerincx, M.A.; Wolff, M.

    2004-01-01

    This paper describes an intelligent maintenance system for Supporting Crew OPErations (SCOPE). SCOPE supports the astronauts onboard the ISS and helps them to maximize the availability of complex payload systems. SCOPE detects system failures, guides the isolation of the root causes of failure, and

  14. Ethernet Operation Administration and Maintenance ; Opportunities for the NREN community

    NARCIS (Netherlands)

    Prins, M.J.; Malhotra, R.

    2011-01-01

    Ethernet started its life as a Local Area Network technology and initially did not have Operations, Administration and Maintenance (OAM) features like IP Ping, IP Traceroute and SDH Loss of Frame. Monitoring and management was mainly done on the IP level. In the case of delivery of Ethernet connecti

  15. Guidance Manual: Asbestos Operations & Maintenance Work Practices. Second Edition.

    Science.gov (United States)

    National Inst. of Building Sciences, Washington, DC.

    This technical manual provides detailed guidance to building owners, asbestos program managers, and operations and maintenance (O&M) workers for managing asbestos-containing materials (ACM) in buildings. The manual addresses four different types of ACM found in buildings and three different levels of precaution which may be warranted by…

  16. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  17. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    The Integrated Renovation Process (IRP) is a user customized methodology based on judiciously selected constructivist and interactive multi-criteria decision making methods (Galiotto, Heiselberg, & Knudstrup, 2014 (expected)). When applied for home renovation, the Integrated Renovation Process...... for the quantitative analyses and the generation of the renovation scenarios so they get more time for the cost optimisation and the qualitative analysis of the homeowners’ needs, wishes and behaviours....

  18. New Trends in the Outsourcing of Maintenance/Operation Services

    CERN Document Server

    Wilhelmsson, M

    2001-01-01

    The contracting-experience of maintenance/operation work in our group can today be considered as rich with the first generation of contract implemented more than 15 years ago. The incumbent contract was started in 1997, so it is now into its 4th year. Certain improvements that have already been implemented has had a large impact on our contract culture e.g. performance indicators. The next re-tendering is now approaching and with this borne in mind, the author will discuss through various sections of this report the following main points: firstly, an overview of the trends today in this area; secondly, comparing these trends with implemented practices; and finally, what can be future development in the outsourcing of the maintenance/operation of the Cooling & Ventilation services.

  19. Longview District Operations and Maintenance Headquarters: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

  20. Longview District Operations and Maintenance Headquarters : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

  1. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    Science.gov (United States)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  2. Operation and maintenance techniques of cranes and Hoist in IMEF

    Energy Technology Data Exchange (ETDEWEB)

    Soong, Woong Sup; Oh, Yon Woo; Ahn, Sang Bock; Park, Dae Gue; Whang, Ryoung Wha

    1999-07-01

    Crane and hoist of 11 sets are installed int the Irradiated Material Examination Facility (IMEF). IMEF is divided into two parts such as hot cell area and service area. 30/5-ton overhead crane is installed in service area for transfer of irradiated material transportation cask and other several kinds of heavy equipment. This report describes maintenance techniques, repair procedure, daily and special checking list, which will ensure safety in routine operation and even in abnormality. (author). 8 refs.

  3. Identifying Human Factors Issues in Aircraft Maintenance Operations

    Science.gov (United States)

    Veinott, Elizabeth S.; Kanki, Barbara G.; Shafto, Michael G. (Technical Monitor)

    1995-01-01

    Maintenance operations incidents submitted to the Aviation Safety Reporting System (ASRS) between 1986-1992 were systematically analyzed in order to identify issues relevant to human factors and crew coordination. This exploratory analysis involved 95 ASRS reports which represented a wide range of maintenance incidents. The reports were coded and analyzed according to the type of error (e.g, wrong part, procedural error, non-procedural error), contributing factors (e.g., individual, within-team, cross-team, procedure, tools), result of the error (e.g., aircraft damage or not) as well as the operational impact (e.g., aircraft flown to destination, air return, delay at gate). The main findings indicate that procedural errors were most common (48.4%) and that individual and team actions contributed to the errors in more than 50% of the cases. As for operational results, most errors were either corrected after landing at the destination (51.6%) or required the flight crew to stop enroute (29.5%). Interactions among these variables are also discussed. This analysis is a first step toward developing a taxonomy of crew coordination problems in maintenance. By understanding what variables are important and how they are interrelated, we may develop intervention strategies that are better tailored to the human factor issues involved.

  4. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  5. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  6. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O. [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  7. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas

    and constructivist multiple criteria decision-making analysis method is selected for developing the work further. The method is introduced and applied to the renovation of a multi-residential historic building. Furthermore, a new scheme, the Integrated Renovation Process, is presented. Finally, the methodology....... In this thesis, examples of nearly zero energy single-family home renovations are presented. The most relevant existing decision support methods and tools applicable to sustainable renovation processes are reviewed and their applicability to high performance sustainable renovation is discussed. A qualitative...... performance sustainable renovations. The main purpose of the work has been to develop a holistic methodology so as to inspire and guide building owners and their renovation project teams to reach high levels of social, environmental and economic performances. The research approach integrates multiple...

  8. Object and operation supported maintenance for mining equipment

    Directory of Open Access Journals (Sweden)

    Walter Bartelmus

    2014-09-01

    Full Text Available The paper aroused in answer to discussion in Mining Magazine (MM September 2011 and July/August 2013. The paper shows that discussion given in the MM issue July/August 2013 does not fulfill expectations expressed in MM issue 2011. The presented paper is the review on maintenance that is based on condition monitoring as tool for detection of faults and failure prevention. Fault and failure are regarded as inevitable during the machine operation as the process of wear and the process of degradation. The question is, if one can influence the wear and degradation process, using condition monitoring. The paper will present technology (in reference to cited papers which demonstrates that the use of the proper method can influence the wear and machine degradation process, using proper condition monitoring techniques and knowing scenarios of wear and degradation process, the maintenance can be rationalized. The presented paper shows possible improvements which are needed to fulfill expectations expressed in MM September 2011 and they are not taken into consideration in MM July/August 3013. These improvements can be fulfilling on the bases of object and operation supported maintenance.

  9. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition......-based) maintenance strategies. This paper describes a risk-based life-cycle approach for optimal planning of OM and design of offshore wind turbines. Damage accumulation models used to describe deterioration mechanisms such as fatigue, corrosion, wear and erosion are associated with significant uncertainty...... turbines. Some of the OM strategies only need basic information on failure rates and costs. Other methods need much more detailed information about damage accumulation, stochastic models for uncertain parameters and processes, reliability of inspections, indicators and monitoring systems, weather...

  10. How the Station will operate. [operation, management, and maintenance in space

    Science.gov (United States)

    Cox, John T.

    1988-01-01

    Aspects of the upcoming operational phase of the Space Station (SS) are examined. What the crew members will do with their time in their specialized roles is addressed. SS maintenance and servicing and the interaction of the SS Control Center with Johnson Space Center is discussed. The planning of payload operations and strategic planning for the SS are examined.

  11. New Operation and Maintenance Contract for Electrical Network

    CERN Document Server

    Kowalik, G

    2001-01-01

    The Electrical Exploitation is one of the few remaining operation services at CERN which nearly entirely relies on the CERN staff. Last year CERN policy, in connection with the LHC project needs, have led to the formulation of the strategy of out-sourcing of the Electrical Exploitation activities, market survey and subsequent Invitation to Tender. The following paper presents the approach used in the preparation of the Invitation to Tender and in solving of the out-sourcing issues applied to the operation and maintenance of the CERN electrical network. In particular the problems of the results oriented contract, quality assurance and performance as well requirement of the constantly increasing productivity of the Contractors team are treated. The paper gives also the particularities of the application of the out-sourcing to the electrical operation service as will as techniques used for the estimation of the work load of the activities being outsourced.

  12. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  13. 18 CFR 367.5000 - Accounts 500-598, Electric operation and maintenance accounts.

    Science.gov (United States)

    2010-04-01

    ..., Electric operation and maintenance accounts. 367.5000 Section 367.5000 Conservation of Power and Water..., FEDERAL POWER ACT AND NATURAL GAS ACT Operation and Maintenance Expense Chart of Accounts § 367.5000 Accounts 500-598, Electric operation and maintenance accounts. Service companies must use accounts...

  14. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... Battery Stacks Operation and Maintenance Requirements § 63.7300 What are my operation and maintenance..., including air pollution control and monitoring equipment, in a manner consistent with good air pollution... operation and maintenance of new or existing by-product coke oven batteries. Each plan must address, at a...

  15. Remodeling, Renovation, & Conversion of Educational Facilities.

    Science.gov (United States)

    Association of Physical Plant Administrators of Universities and Colleges, Washington, DC.

    Based on a series of workshops, this collection of papers provides a framework for thought--emphasizing planning within time, flexibility, and maintenance constraints--as well as a practical guide for actual engineering of remodeling/renovation/conversion projects. Is remodeling always less expensive than new construction? Should high initial…

  16. Feasibility study for a transportation operations system cask maintenance facility

    Energy Technology Data Exchange (ETDEWEB)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  17. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    Science.gov (United States)

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  18. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    Science.gov (United States)

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  19. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  20. Inertial Fusion Power Plant Concept of Operations and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Anklam, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Knutson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dunne, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kasper, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sheehan, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lang, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Roberts, V. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mau, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  1. Inertial fusion power plant concept of operations and maintenance

    Science.gov (United States)

    Knutson, Brad; Dunne, Mike; Kasper, Jack; Sheehan, Timothy; Lang, Dwight; Anklam, Tom; Roberts, Valerie; Mau, Derek

    2015-02-01

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  2. Renovation work at Restaurant 1

    CERN Multimedia

    2006-01-01

    Due to the age of the present kitchen and freeflow installations in Restaurant 1, essential renovation work is due to be carried out. The work is scheduled to last from September 2006 to May 2007. Work on the self-service area of the restaurant will commence in November. Every effort will be made to minimise the inconvenience caused to users of the restaurant and we thank you in advance for your co-operation during this period.

  3. Renovation works at Restaurant 1

    CERN Multimedia

    2006-01-01

    Due to the age of the present kitchen and freeflow installations in Restaurant 1, essential renovations are due to be carried out. The planned period for this project is September 2006 to May 2007. Work on the self-service area of the restaurant will commence in November. Every effort will be made to minimise the inconvenience caused to users of the restaurant and we thank you in advance for your co-operation during this period.

  4. Renovation of social housing

    DEFF Research Database (Denmark)

    Jensen, Stina Rask; Hvejsel, Marie Frier; Kirkegaard, Poul Henning

    an understanding of the built environment as a spatial continuum that is in constant alteration. When we engage in the renovation of a building, we inevitably enter into a dialogue with this continuum. The motivation to alter an existing building may be decay and change in the use, or, as has been the case...... in the renovation of social housing. Methodologically, this hypothesis is investigated by re-reading the task of energy renovation through the lens of tectonic architectural theory. Specifically, Eduard Sekler’s etymological distinction between structure, construction, and tectonics is developed as a framework...... for addressing the spatial implications and potentials of technical initiatives in contemporary energy renovations within the continuum described by Scott. The framework is applied in two case studies of recent energy renovations of social housing dwellings. Finally, the paper discusses whether the technical...

  5. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency Release 3.0

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-08-01

    This Operations and Maintenance (O&M) Best Practices Guide was developed under the direction of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government’s implementation of sound, cost effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

  6. Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Dodson, Guy; Pero, Vincent (Shoshone-Paiute Tribes of the Duck Valley Reservation. Dept. of Habitat, Parks, Fish and Game.)

    2002-01-01

    Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation of boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.

  7. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  8. Energy and environmental assessment in connection with renovation; Energi- og miljoevurdering ved renovering

    Energy Technology Data Exchange (ETDEWEB)

    Holleris Petersen, E.

    2001-07-01

    the necessary building element to be used in renovation and this is the reason why environmental assessment in renovation in general can be expected to be more time consuming than new building. The performed energy and environmental assessments show that energy consumption for operation and its environmental impact is the most important, but also energy and environmental assessments of production and waste management can be important to consider when selecting between new and not commonly used energy or building solutions. (au)

  9. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    Energy Technology Data Exchange (ETDEWEB)

    Enbar, Nadav [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Weng, Dean [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.

  10. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    Energy Technology Data Exchange (ETDEWEB)

    Enbar, Nadav [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Weng, Dean [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.

  11. Dextre: Improving maintenance operations on the International Space Station

    Science.gov (United States)

    Coleshill, Elliott; Oshinowo, Layi; Rembala, Richard; Bina, Bardia; Rey, Daniel; Sindelar, Shelley

    2009-05-01

    The Special Purpose Dexterous Manipulator (SPDM), known as "Dextre", is currently slated to launch in February 2008 for deployment on the International Space Station (ISS) as the final component of Canada's Mobile Servicing System (MSS). Dextre's primary role on the Space Station is to perform repair and replacement (R&R) maintenance tasks on robotically compatible hardware such as Orbital Replaceable Units (ORUs), thereby eventually easing the burden on the ISS crew. This burden on the on-orbit crew translates practically into crew time being a limited resource on the ISS, and as such, finding ways to assist the crew in performing their tasks or offloading the crew completely when appropriate is a bonus to the ISS program. This is already accomplished very effectively by commanding as many non-critical robotics tasks as possible, such as powering up and free-space maneuvering of the Space Station Remote Manipulator System (SSRMS), known as "Canadarm2", from the Ground. Thus, beyond its primary role, and based on an increasing clarity regarding the challenges of external maintenance on the ISS, Dextre is being considered for use in a number of ways with the objective of improving ISS operations while reducing and optimizing the use of crew time through the use of ground control for various tasks, pre-positioning hardware, acting as a temporary storage platform to break an Extra Vehicular Activity (EVA) day into manageable timelines, and extending the physical reach and range of the Canadarm2. This paper discusses the planned activities and operations for Dextre an rationale for how these will help optimize the use of crew resources on the ISS.

  12. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

  13. Estimation of fuel cell operating time for predictive maintenance strategies

    Energy Technology Data Exchange (ETDEWEB)

    Onanena, R. [FC LAB, Techn' Hom, rue Thierry Mieg, 90010 Belfort Cedex (France); FEMTO-ST (UMR CNRS 6174), ENISYS department, University of Franche-Comte (France); INRETS - LTN, ' ' Le Descartes 2' ' , 2 rue de la butte verte, 93166 Noisy-le-Grand Cedex (France); Oukhellou, L. [INRETS - LTN, ' ' Le Descartes 2' ' , 2 rue de la butte verte, 93166 Noisy-le-Grand Cedex (France); CERTES Universite Paris 12, 61 avenue du Gal. de Gaulle, 94100 Creteil (France); Candusso, D. [FC LAB, Techn' Hom, rue Thierry Mieg, 90010 Belfort Cedex (France); INRETS - LTN, ' ' Le Descartes 2' ' , 2 rue de la butte verte, 93166 Noisy-le-Grand Cedex (France); Same, A.; Aknin, P. [INRETS - LTN, ' ' Le Descartes 2' ' , 2 rue de la butte verte, 93166 Noisy-le-Grand Cedex (France); Hissel, D. [FC LAB, Techn' Hom, rue Thierry Mieg, 90010 Belfort Cedex (France); FEMTO-ST (UMR CNRS 6174), ENISYS department, University of Franche-Comte (France)

    2010-08-15

    Durability is one of the limiting factors for spreading and commercialization of fuel cell technology. That is why research to extend fuel cell durability is being conducted world wide. A pattern-recognition approach aiming to estimate fuel cell operating time based on electrochemical impedance spectroscopy measurements is presented here. It is based on extracting the features from the impedance spectra. For that purpose, two approaches have been investigated. In the first one, particular points of the spectrum are empirically extracted as features. In the second approach, a parametric modeling is performed to extract features from both the real and the imaginary parts of the impedance spectrum. In particular, a latent regression model is used to automatically split the spectrum into several segments that are approximated by polynomials. The number of segments is adjusted taking into account the a priori knowledge about the physical behavior of the fuel cell components. Then, a linear regression model using different subsets of extracted features is employed for an estimate of the fuel cell operating time. The effectiveness of the proposed approach is evaluated on an experimental dataset. Allowing the estimation of the fuel cell operating time, and consequently its remaining duration life, these results could lead to interesting perspectives for predictive fuel cells maintenance policy. (author)

  14. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  15. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  16. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  17. Operation and maintenance cost data for residential photovoltaic modules/panels

    Science.gov (United States)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-01-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  18. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... operations base, and main maintenance base; change of address. (a) Each certificate holder must maintain...

  19. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    2015-01-01

    the project stakeholders to overcome most informational barriers to sustainable home renovation such as lack of knowledge, lack of interest, lack of support, and lack of social and emotional understanding. The homeowners were able to perceive the new and numerous qualities they were getting in their newly......The potential for primary energy savings is greatest in the building sector. A very relevant way to save energy is to increase the rates and depths of building renovations. In order to reach such goals, building owners need to be convinced to invest in high-performance sustainable renovation...

  20. 75 FR 78336 - Finding of No Significant Impact From the Expansion, Renovation, Operation and Maintenance of the...

    Science.gov (United States)

    2010-12-15

    ....-Mexico border. As a result of the North American Free Trade Agreement (NAFTA), the LPOE serves as the... international trade infrastructure between the U.S., Mexico and Canada. GSA has sought a Presidential permit... volume between the U.S. and Mexico brought about by NAFTA. Pedestrian crossings have tripled since 2002...

  1. Implementation Guideline for Maintenance Line Operations Safety Assessment (M-LOSA) and Ramp LOSA (R-LOSA) Programs

    Science.gov (United States)

    2012-08-01

    airlines and Maintenance Repair & Overhaul ( MROs ) communities. 53 Appendix A. Organizational Change Management – Stakeholder Strategy...Maintenance Line Operations Safety Audit MRO – Maintenance, Repair & Overhaul NOSS – Normal Operations Safety Survey QA – Quality Assurance RACI

  2. The Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    The Integrated Renovation Process (IRP) is a user customized methodology based on judiciously selected constructivist and interactive multi-criteria decision making methods (Galiotto, Heiselberg, & Knudstrup, 2014 (expected)). The IRP supports, informs and reassures building owners to decide...... they get more time for the cost optimization and the qualitative analysis of the users’ needs and behaviours. In order to reach a fossil free energy building stock within an acceptable time frame, it is primordial that researchers, politicians and the building industry work hand in hand. Indeed, in order...... to overcome the financial barriers to energy renovation and bring a new type of building experts in the building renovation sector, cost optimization tools for building renovation have been and can be developed but new legislation and politico-economic supports are still much needed. We present in this report...

  3. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal......For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...

  4. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  5. Operation and Maintenance Resources for Small Drinking Water Systems

    Science.gov (United States)

    These documents and tools provide information on identifying treatment technologies that remove multiple contaminants, schedules for maintenance tasks and checklists, and logs for easily recording findings.

  6. Industrial operations and maintenance energy measures: A review

    Energy Technology Data Exchange (ETDEWEB)

    Parker, S.A.; Gaustad, K.L.; Winiarski, D.W.

    1994-12-01

    Industry consumes a significant percentage of the total electric energy consumption both nationally and in the Pacific Northwest. However, industrial demand-side management (DSM) activities in this sector are underdeveloped and typically concentrate on new technologies and new equipment. An overlooked opportunity for electric resource development is through operations and maintenance (O and M) activities. The purpose of this project is to determine the industrial DSM potential that may be achieved through O and M practices both in the US and the Pacific Northwest. The overall goal of the project is to identify, quantify, confirm, and develop conservation resources that can be achieved from the industrial sector through O and M practices and energy measures. The results of the study identify a significant electric resource potential available through improved O and M activities in industry. Several O and M type energy-saving measures that increase efficiencies and reduce loads are identified and estimates of potential energy savings associated with each measure are presented. Systems identified with the most potential include compressed-air systems; motors and motor drives; lighting; heating, ventilating and air conditioning (HVAC); and control systems. The results of the research show that industrial electric energy consumption can be notably reduced by implementing key O and M type energy measures. Specifically, the results of industrial energy audits, case studies, and other published sources indicate that reductions in energy consumption from improved O and M activities can average between 8% and 12.5%.

  7. Distinctiveness of Initial Preform Properties in Renovation

    Directory of Open Access Journals (Sweden)

    V. M. Yaroslavtsev

    2015-01-01

    Full Text Available Technologies of renovation form a special group of resource-and energy saving technological processes as they are, by definition, already aimed either at increasing resource of the objects satisfying needs of the society life support and practical activities in different spheres, or at extension of their life cycle including a reuse of material from which they are made. Renovation is used where there is a material object, which does not meet requirements of standard or technical documentation.A characteristic feature of the renovation technologies is lack of procedure for a choice of the preform as in all cases an initial preform is the renovation object itself. Thus each object, acting as an initial preform, has the exclusively individual properties, including technological ones.Distinctiveness of renovation object properties is correlated, first of all, with the personified conditions of formation and (or change of condition of their properties in time at all stages of life cycle (production – transportation – warehousing – operation starting with a preform material when manufacturing under all types of loadings (technological and operational. As a result each object forms its "history" of loading and damages and, therefore, its information base which has to consider the phenomenon of “heredity of life cycle”. The term "heredity of life cycle" characterizes information support of object at any moment under review, including both information of technological inheritance, and data of operational heredity.As a result at every moment of time we have a product with a set of new, uncertain properties caused by the phenomena of heredity of life cycle. These properties are individual for each object to be renovated, which changed its status for the status of initial preform for different types of renovation technologies. This is one of the most important distinctions of renovation technology from the technology used to manufacture a new

  8. Operation and maintenance of Fermilab`s satellite refrigerator expansion engines

    Energy Technology Data Exchange (ETDEWEB)

    Soyars, W.M.

    1996-09-01

    Fermilab`s superconducting Tevatron accelerator is cooled to liquid helium temperatures by 24 satellite refrigerators, each of which uses for normal operations a reciprocating `wet` expansion engine. These expanders are basically Process System (formerly Koch) Model 1400 expanders installed in standalone cryostats designed by Fermilab. This paper will summarize recent experience with operations and maintenance of these expansion engines. Some of the statistics presented will include total engine hours, mean time between major and minor maintenance, and frequent causes of major maintenance.

  9. Operations Research Models for Scheduling Railway Infrastructure Maintenance

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella)

    2009-01-01

    textabstractIn the last decades, maintenance of technical systems has become increasingly impor- tant in many industries. Such systems are transport systems (rail, bus, airplane), civil engineering systems (roads, buildings, bridges), health care (hospitals), communication systems, manufacturing pla

  10. 14 CFR 171.273 - Maintenance and operations requirements.

    Science.gov (United States)

    2010-01-01

    ... beacon power, and modulation. (18) The following information concerning the ISMLS facility: (i) Facility... emission and frequencies of the ISMLS localizer, glide path, beacon markers, and associated compass... marker beacon radiation characteristics must be conducted in accordance with the maintenance...

  11. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  12. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Science.gov (United States)

    2010-07-01

    ...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.804 Aircraft water system operations and maintenance plan. (a) Each air carrier must develop and implement an aircraft water system operations and maintenance plan for each aircraft water system that it...

  13. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    Science.gov (United States)

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  14. Best Practices in Photovoltaic System Operations and Maintenance: 2nd Edition

    Energy Technology Data Exchange (ETDEWEB)

    Whaley, Cass [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-12-01

    This best practices guide encourages high-quality system deployment and operation that improves lifetime project performance and energy production while reducing, or at least optimizing, costs to deliver an operation and maintenance program.

  15. Umatilla Hatchery Satellite Facilities; Operations and Maintenance, Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, Gerald

    2003-05-01

    -one spring chinook mortalities were examined for culturable bacteria and enteric redmouth disease (Yersinia ruckeri) was detected in one fish. Cell culture assays for replicating viral agents on spawned fall chinook were negative. One hundred eighty-three spawned fall chinook females were sampled for BKD and all had ELISA readings between 0.00 and 0.099, indicating negative to low level positives. Two fall chinook mortalities were examined for BKD and both had OD{sub 405} readings of less than 0.099, indicating negative to very low levels of Rs antigen. Regularly scheduled maintenance of pumps, equipment, and facilities was performed in 2002. Critical maintenance and repair was also performed by Umatilla Passage Facility Operation and Maintenance crews.

  16. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Greg; Pugh, Ray; Melendez, Aldo P.; Hunt, W. D.

    2010-08-04

    This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

  17. Integrated Renovation Process

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    2016-01-01

    structured and holistic method of decision making toward nearly zero-energy building renovation. The methodology is evolutive, implementable on a large scale, and allows an optimal integration of nonexpert decision makers. In practice, such a scheme allowed most behavioral barriers to sustainable home...... renovation to be overcome. The homeowners were better integrated and their preferences and immaterial values were better taken into account. To keep the decision-making process economically viable and timely, the process as known today still needs to be improved, and new tools need to be developed...

  18. Operation and maintenance cost data for residential photovoltaic modules/panels

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Burt Hill Kosar Rittelmann Associates has conducted a study to identify and estimate costs associated with the operation and maintenance of residential photovoltaic modules and arrays. Six basic topics related to operation and maintenance to photovoltaic arrays were investigated - General (Normal) Maintenance, Cleaning, Panel Replacement, Gasket Repair/Replacement, Wiring Repair/Replacement, and Termination Repair/Replacement. The effects of the mounting types - Rack Mount, Stand-Off Mount, Direct Mount, and Integral Mount - and the installation/replacement type - Sequential, Partial Interruption, and Independent - have been identified and described. Recommendation on methods of reducing maintenance costs are made.

  19. Kinds of initial billets in renovation technologies

    Directory of Open Access Journals (Sweden)

    V. M. Yaroslavtsev

    2014-01-01

    Full Text Available Nowadays, technologists in charge of repair, restoration, modernization, and utilization of engineering and other tangible objects widely use the concepts "renovation" and "renovation technologies" pioneered at BMSTU. In forming a new field of science these concepts, in the proper sense of the word, are of composite, generalized character. They concern all the activities and technologies aimed at increasing an object resource or its lifecycle extension, including object material recycling.In the cutting-edge renovation technologies an object (part, assembly, machine, etc. damaged in the operating process is considered to be an initial billet. In renovation, one of the most widespread kinds of initial billets is a damaged part.Such a part can be used again, if, for example, it has saved its material properties in full measure while only contact surfaces or parts of these surfaces have become damaged, and at a point of renovation they can be restored for recycling. If a part has lost its initial properties in full bulk of material, it may be reusable in the assemblies and machines with less rigid requirements for material properties.Or in case of properties loss below the permissible level a damaged part-billet is utilized. Thus, the part-billet state at the point of renovation defines the kind of renovation technology and the main (basic technological method to effect on the damaged part, as well as a set and a sequence of technological methods in general manufacturing process of renovation.However renovation technologies are used not only at the repair and restoration stages after operation-service. So, at the manufacturing stage of a new product to provide the quality to raise a resource are applied the same technological methods as renovation technologies for the objects damaged at the stage of operation. Besides, it is known that at the manufacturing stage a part quality depends not only on the last operation, but also on the features of

  20. Renovation of the CERN Computer Centre

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The Computer Centre at CERN is seen after half of the equipment is the large ground floor room has been removed. A large-scale spring-cleaning operation took place before renovation work for the new CERN Grid system began. Fifteen kilometres of cables that were no longer needed were removed from the cavity floor for recycling.

  1. Risk-Based Operation and Maintenance Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    This paper describes how risk-based decision making can be used for maintenance planning of components exposed to degradation such as fatigue in offshore wind turbines. In fatigue models, large epistemic uncertainties are usually present. These can be reduced if monitoring results are used...

  2. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  3. Towards a Risk-based Decision Support for Offshore Wind Turbine Installation and Operation & Maintenance

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard; Vatne, Sigrid Ringdalen

    2016-01-01

    Costs of operation & maintenance, assembly, transport and installation of offshore wind turbines contribute significantly to the total cost of offshore wind farm. These operations are mostly carried out by specific ships that have to be hired for the operational phase and for duration of installa......Costs of operation & maintenance, assembly, transport and installation of offshore wind turbines contribute significantly to the total cost of offshore wind farm. These operations are mostly carried out by specific ships that have to be hired for the operational phase and for duration...

  4. Value centric approaches to the design, operations and maintenance of wind turbines

    Science.gov (United States)

    Khadabadi, Madhur Aravind

    Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal

  5. Wind turbine blade life-time assessment model for preventive planning of operation and maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2014-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...

  6. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...

  7. 40 CFR 300.435 - Remedial design/remedial action, operation and maintenance.

    Science.gov (United States)

    2010-07-01

    ...): (i) Source control maintenance measures; and (ii) Ground- or surface-water measures initiated for the primary purpose of providing a drinking-water supply, not for the purpose of restoring ground water. ..., operation and maintenance. 300.435 Section 300.435 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  8. Some insights in novel risk modeling of liquefied natural gas carrier maintenance operations

    Science.gov (United States)

    Nwaoha, T. C.; John, Andrew

    2016-06-01

    This study discusses the analysis of various modeling approaches and maintenance techniques applicable to the Liquefied Natural Gas (LNG) carrier operations in the maritime environment. Various novel modeling techniques are discussed; including genetic algorithms, fuzzy logic and evidential reasoning. We also identify the usefulness of these algorithms in the LNG carrier industry in the areas of risk assessment and maintenance modeling.

  9. 46 CFR 15.1107 - Maintenance of merchant mariners' records by owner or operator.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Maintenance of merchant mariners' records by owner or operator. 15.1107 Section 15.1107 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Vessels Subject to Requirements of STCW § 15.1107 Maintenance...

  10. Occupational exposure to asbestos during renovation of oil-shale fuelled power plants in Estonia.

    Science.gov (United States)

    Kangur, Maie

    2007-01-01

    Many thousands of tonnes of asbestos were used in buildings in the past, especially for thermal insulation of pipes and boilers in power plants. Occupational exposure to asbestos dust now mainly occurs during demolition, renovation and routine maintenance activities. The objective of this study was to evaluate occupational exposure to airborne asbestos during renovation of solid oil-shale fuelled power plants carried out in 2001-2003. Air monitoring inside and outside of the renovation area was performed. The concentration of airborne fibres in the working environment increased during renovation but the valid limit value (0.1 fibres/cm(3)) was not exceeded.

  11. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Liping; Hong, Tianzhen

    2013-01-01

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct

  12. Operation and maintenance manual for the common video end effector system (CVEE) system 6260

    Energy Technology Data Exchange (ETDEWEB)

    Pardini, A.F., Westinghouse Hanford

    1996-07-24

    This document defines the requirements for the operation,maintenance, and storage of the Common Video End Effector System (CVEE) used with the video end effectors as part of the Light Duty Utility Arm (LDUA) system.

  13. Mapping Operation and Maintenance Strategy for U.S. Offshore Wind Farms

    Energy Technology Data Exchange (ETDEWEB)

    Dewan, Ashish; Stehly, Tyler

    2017-06-22

    This presentation provides an overview of a collaborative effort between ECN and the National Renewable Energy Laboratory that focused on an operation and maintenance study of six offshore wind power plants in the United States.

  14. Elements of an Asbestos Operations and Maintenance (O&M) Program

    Science.gov (United States)

    Links to descriptions of Elements of an Operations and Maintenance (O&M) Program: Training, Occupant Notification, Monitoring ACM, Job-Site Controls for Work Involving ACM, Safe Work Practices, Recordkeeping, Worker Protection.

  15. Risk-Based Operation and Maintenance Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    This paper describes how risk-based decision making can be used for maintenance planning of components exposed to degradation such as fatigue in offshore wind turbines. In fatigue models, large epistemic uncertainties are usually present. These can be reduced if monitoring results are used to upd...... to update the models, and hereby a better basis for decision making is obtained. An application example shows how a Bayesian network model can be used as a tool for updating the model and assist in risk-based decision making....

  16. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    to oil and gas structures. In addition, condition monitoring systems are often available, and the information should be taken into account when making decisions. In this thesis, methods for risk-based maintenance planning using Bayesian methods are investigated, with the aim of making optimal decisions...... to achieve big savings, but the results of course largely depend on the input. With real decision problems, it can be difficult to formulate the model if the design assumptions are not fulfilled in real life. The potential of the method is large, but further development is necessary, especially concerning...

  17. A training simulator ensures the competence of operating and maintenance staff

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L. [ed.

    1997-11-01

    IVO Generation Services Ltd (IGS) has overall responsibility made on the basis of long-term contracts for the operation and maintenance of the customers` power plants. Partnership is the key concept, and customers are thus able to concentrate on their own specific business activities. Research and development projects are primarily aimed at cutting the customer`s power generation costs and at increasing the efficiency of operation and maintenance

  18. 49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... maintenance activities and for emergency response. For transmission lines, the manual must also include... control room management procedures required by § 192.631. (c) Abnormal operation. For transmission lines... gas distribution operators that are operating transmission lines in connection with their...

  19. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Science.gov (United States)

    2010-07-01

    ... protection. All owners and operators of steel UST systems with corrosion protection must comply with the... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Operation and maintenance of corrosion... is used to store regulated substances: (a) All corrosion protection systems must be operated...

  20. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and equipment shall be maintained in safe operating condition and machinery or equipment in unsafe...

  1. Environmental Management Model for Road Maintenance Operation Involving Community Participation

    Science.gov (United States)

    Triyono, A. R. H.; Setyawan, A.; Sobriyah; Setiono, P.

    2017-07-01

    Public expectations of Central Java, which is very high on demand fulfillment, especially road infrastructure as outlined in the number of complaints and community expectations tweeter, Short Mail Massage (SMS), e-mail and public reports from various media, Highways Department of Central Java province requires development model of environmental management in the implementation of a routine way by involving the community in order to fulfill the conditions of a representative, may serve road users safely and comfortably. This study used survey method with SEM analysis and SWOT with Latent Independent Variable (X), namely; Public Participation in the regulation, development, construction and supervision of road (PSM); Public behavior in the utilization of the road (PMJ) Provincial Road Service (PJP); Safety in the Provincial Road (KJP); Integrated Management System (SMT) and latent dependent variable (Y) routine maintenance of the provincial road that is integrated with the environmental management system and involve the participation of the community (MML). The result showed the implementation of routine maintenance of road conditions in Central Java province has yet to implement an environmental management by involving the community; Therefore developed environmental management model with the results of H1: Community Participation (PSM) has positive influence on the Model of Environmental Management (MML); H2: Behavior Society in Jalan Utilization (PMJ) positive effect on Model Environmental Management (MML); H3: Provincial Road Service (PJP) positive effect on Model Environmental Management (MML); H4: Safety in the Provincial Road (KJP) positive effect on Model Environmental Management (MML); H5: Integrated Management System (SMT) has positive influence on the Model of Environmental Management (MML). From the analysis obtained formulation model describing the relationship / influence of the independent variables PSM, PMJ, PJP, KJP, and SMT on the dependent variable

  2. Sustainable renovation concepts for single-family houses

    DEFF Research Database (Denmark)

    Vanhoutteghem, Lies; Tommerup, Henrik M.; Svendsen, Svend

    necessary for the renovation of the house including quotation for the work, financing and management of the contract work. An ideal full-service concept in five phases is proposed, going from initial evaluation of the house, to extensive analyses, proposal for package solutions, coordinated execution......, the financial possibilities of the homeowner etc. Calculation of packages of energy efficient renovation solutions targeted the three segments of houses show that primary energy use and heating bill can be reduced with up to about 75% or a factor 4 corresponding to the level of a new house or better. It seems...... and operation and finally management of the house after renovation....

  3. Operation and maintenance of thermal power stations best practices and health monitoring

    CERN Document Server

    Chanda, Pradip

    2016-01-01

    This book illustrates operation and maintenance practices/guidelines for economic generation and managing health of a thermal power generator beyond its regulatory life. The book provides knowledge for professionals managing power station operations, through its unique approach to chemical analysis of water, steam, oil etc. to identify malfunctioning/defects in equipment/systems much before the physical manifestation of the problem. The book also contains a detailed procedure for conducting performance evaluation tests on different equipment, and for analyzing test results for predicting maintenance requirements, which has lent a new dimension to power systems operation and maintenance practices. A number of real life case studies also enrich the book. This book will prove particularly useful to power systems operations professionals in the developing economies, and also to researchers and students involved in studying power systems operations and control. .

  4. Application of a Decision Support Tool in Three Renovation Projects

    Directory of Open Access Journals (Sweden)

    Linus Malmgren

    2015-09-01

    Full Text Available Building owners are encouraged to reduce energy use in order to both contribute to national energy-saving goals and reduce the costs of heating and operation. It is important to choose the most optimal renovation measures available so as to achieve cost-effective energy use while maintaining excellent indoor environments, without sacrificing architectural quality or negatively affecting the environment. Building owners and managers often have neither the time nor the expertise required to properly evaluate the available renovation options before making a final decision. Renovation measures are often calculated to repay investments in a short time, rather than taking into account life-cycle costs (LCC, despite the fact that a thoughtful, comprehensive renovation is often more cost-effective in the long run. This paper presents a systematic approach for evaluating different renovation alternatives based on a number of sustainability criteria. The methodology has been verified using three multi-family apartment buildings in Sweden. The benefit of using the proposed methodology is made clear through a comparison between the different renovation alternatives from a sustainability perspective, and will hopefully serve as encouragement to choose renovation measures which involve marginally increased investments but lead to significant environmental and social benefits in the long-term.

  5. Maintaining High-Performance Schools after Construction or Renovation

    Science.gov (United States)

    Luepke, Gary; Ronsivalli, Louis J., Jr.

    2009-01-01

    With taxpayers' considerable investment in schools, it is critical for school districts to preserve their community's assets with new construction or renovation and effective facility maintenance programs. "High-performance" school buildings are designed to link the physical environment to positive student achievement while providing such benefits…

  6. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES

    Energy Technology Data Exchange (ETDEWEB)

    Harris, S.; Gross, R.

    2014-04-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  7. AIRCRAFT MAINTENANCE ENABLED JOINT CONCEPT FOR ENTRY OPERATIONS

    Science.gov (United States)

    2017-04-06

    logistics has been a factor in the use of airpower since its first use back in 1916 when Brigadier General John J. Pershing used aircraft while...Notes 1 Maj Gen Charles Q. Brown Jr., “Untether Operations,” Air and Space Power Journal 29, no. 3 (June 2015): 18. 2 “Air Force Doctrine...2013/09/29/rapid-raptor-package/. 37 Brown Jr., “Untether Operations,” 22. 38 “Air Force Enlisted Classification Directory” (HQ AFPC/DP3ST, October

  8. The maintenance of key biodiversity attributes through ecosystem restoration operations

    Science.gov (United States)

    Robert W. Gray; Bruce A. Blackwell

    2008-01-01

    The requirement to manage for key biodiversity attributes in dry forest ecosystems is mandated in the Forest Practices Code Act of British Columbia. These attributes include snags, large old trees, and large organic debris. In the Squamish Forest District dry forest restoration activities center on the use of thinning operations followed by prescribed fire to restore...

  9. Borehole dilatometer installation, operation, and maintenance at sites in Hawaii

    Science.gov (United States)

    Myren, G.D.; Johnston, M.J.S.; Mueller, R.J.

    2006-01-01

    In response to concerns about the potential hazard of Mauna Loa volcano in Hawaii, the USGS began efforts in 1998 to add four high-resolution borehole sites. Located at these sites are; strainmeters, tiltmeters, seismometers, accelerometers and other instrumentation. These instruments are capable of providing continuous monitoring of the magma movement under Mauna Loa. Each site was planned to provide multi-parameter monitoring of volcanic activity. In June of 2000, a contract was let for the core drilling of three of these four sites. They are located at Hokukano (west side of Mauna Loa) above Captain Cook, Hawaii; at Mauna Loa Observatory (11,737 feet near the summit), and at Mauna Loa Strip Road (east side of Mauna Loa). Another site was chosen near Halema'uma u' and Kilauea's summit, in the Keller deep well. (See maps). The locations of these instruments are shown in Figure 1 with their latitude and longitude in Table 1. The purpose of this network is to monitor crustal deformation associated with volcanic intrusions and earthquakes on Mauna Loa and Kilauea volcanoes. This report describes the methods used to locate sites, install dilatometers, other instrumentation, and telemetry. We also provide a detailed description of the electronics used for signal amplification and telemetry, plus techniques used for instrument maintenance. Instrument sites were selected in regions of hard volcanic rock where the expected signals from magmatic activity were calculated to be a maximum and the probability of earthquakes with magnitude 4 or greater is large. At each location, an attempt was made to separate tectonic and volcanic signals from known noise sources for each instrument type.

  10. Potential energy savings in renovation projects of residential and service buildings; Energiansaeaestoemahdollisuudet rakennuskannan korjaustoiminnassa

    Energy Technology Data Exchange (ETDEWEB)

    Heljo, J.; Vihola, J.

    2012-11-01

    maintenance. Residential buildings, about 70 % of which are owned by private individuals, play a major role in renovation. The owners cannot be enticed or ordered to implement renovations that they do not find sensible or cannot afford. Especially in areas facing an uncertain future, the financial capacity for expensive renovation measures is low. In theory, it is possible to save considerably more energy than is considered feasible. The theoretical savings potential was estimated by making the entire residential and service building stock correspond to 2010 energy regulations for new construction in the calculation model. That resulted in about 40 % savings in the existing stock. That level is, however, realisable only in the case of individual buildings. Since some buildings and structural elements have already been renovated, and some will not be renovated for various reasons, a maximum of half of this theoretical savings potential in the entire building stock (about 20 %) will be realised by 2050. The limiting factors are technical, economical, functional and decision-making related. The key piece of input data for calculations was the number of renovation operations in connection with which energy-saving measures can be carried out. An average of about 2 % of structural elements are repaired annually. More windows are replaced than other elements. Annual energy savings depend on the rate of renovations and the energy efficiency of selected solutions. The feasible annual extra savings in heating energy from renovations varies from 0,2-0,7 % in the case of the existing residential and service building stock. In 2020 the cumulative annual savings would thus be 2-7 % and in 2050 8-28 % compared to 2010. The in-between values can be interpolated linearly. Based on the calculations of this study, the realisable savings potential in the current building stock would be about 20 % in 2050. That is assumed possible, but without intensified energy-saving measures, the savings could

  11. Space heating savings via continuous building renovation up to 2050. Network for energy renovation; Varmebesparelse ved loebende bygningsrenovering frem til 2050. Netvaerk for energirenovering

    Energy Technology Data Exchange (ETDEWEB)

    Wittchen, K.B.; Kragh, J.

    2013-03-15

    The report presents analysis of net heat savings related to ongoing building renovations until 2050 if building parts are insulated according to requirements of the Building Regulations 2010 at the time when the building parts anyhow must undergo regular renovation and maintenance or replacement. The analysis is compared with an assessment of the effect of a 100% implementation of the energy requirements of BR10 for renovation / replacement of building components. This comparison provides the ultimate energy saving using more insulation in connection with the planned renovation and replacement. The underlying calculation model is built using data from the Danish Building and Housing Register and statistical data from the Energy Labeling Scheme for building insulation standard and heated area of roof, exterior wall, floor / slab and windows / doors. The report was prepared for the Danish Energy Agency and is targeted at participants in the network for energy renovation, especially the construction industry and agencies, and policy makers. (LN)

  12. 30 CFR 77.404 - Machinery and equipment; operation and maintenance.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and equipment shall be maintained in...

  13. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  14. Operation and Maintenance of the Research Platform FLIP

    Science.gov (United States)

    2015-07-01

    operate safety in sup^urt uf uNk fcSedieh. \\ uiiJin^ ficts also cuveieJ the cust uf a ruutlnc dry docking of FLIP in 2013. Dry dockings occur at 3...support of ONR research. ONR funding has also covered the cost of an 18 June to 18 July 2013 routine dry docking , of FLIP. Dry dockings occur at a 3-year...18 July 2013, FLIP underwent a routine dry dockings in the navy floating dry dock USS ARCO ARDM 5 at the Naval Base Point Loma, San Diego. Routine

  15. Overheating assessment of energy renovations

    DEFF Research Database (Denmark)

    Psomas, Theofanis Ch.; Heiselberg, Per Kvols; Duer, Karsten

    2016-01-01

    In many post-occupancy studies of renovated houses elevated temperatures have been documented. This article presents in which situations overheating need to be addressed and which renovation measures are causing this need. The analysis contains representative houses from central and north Europe....

  16. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, Gerald D.

    1996-05-01

    The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

  17. The radioactive materials packaging handbook: Design, operations, and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Shappert, L.B.; Bowman, S.M. [Oak Ridge National Lab., TN (United States); Arnold, E.D. [Lockheed Martin Energy Systems, Oak Ridge, TN (United States)] [and others

    1998-08-01

    As part of its required activities in 1994, the US Department of Energy (DOE) made over 500,000 shipments. Of these shipments, approximately 4% were hazardous, and of these, slightly over 1% (over 6,400 shipments) were radioactive. Because of DOE`s cleanup activities, the total quantities and percentages of radioactive material (RAM) that must be moved from one site to another is expected to increase in the coming years, and these materials are likely to be different than those shipped in the past. Irradiated fuel will certainly be part of the mix as will RAM samples and waste. However, in many cases these materials will be of different shape and size and require a transport packaging having different shielding, thermal, and criticality avoidance characteristics than are currently available. This Handbook provides guidance on the design, testing, certification, and operation of packages for these materials.

  18. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...... & Maintenance of offshore wind turbines. Further, the paper considers models for uncertainty modelling and reliability assessment of structural components such as tower, blades, substructure and foundation as well as cast steel drivetrain components. The function of a wind turbine is highly dependent on many...... electrical and mechanical components as well as a control system also reliability aspects of these components are discussed in the paper. Illustrative examples are presented considering uncertainty modelling, reliability assessment and risk-based planning of Operation & Maintenance....

  19. Ship Operations, Maintenance, Repair and Upgrade for the R/V KILO MOANA

    Science.gov (United States)

    2017-07-20

    upgrade the research vessel Kilo Moana, a ship owned by the federal government, operated by University of Hawaii under charter agreement with the...Office of Naval Research . 15. SUBJECT TERMS Research vessel, operation , maintenance, repair. 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF a...University of Hawaii University of Hawaii operates Research Vessel (R/V) Kilo Moana (AGOR 26), a SWATH vessel owned by the federal government and

  20. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  1. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    Energy Technology Data Exchange (ETDEWEB)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options.

  2. The building stock from perspective of change - renovation roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Airaksinen, M., Email: miimu.airaksinen@vtt.fi

    2012-06-15

    By 2050, population, society and economic structures will have changed several times. The long and short-term goals and objectives concerning our built environment are mutually contradictory. Determining objectives or creating scenarios for the future built environment is fruitless. We should approach the development of the built environment from the perspective of change and improve the flexibility and adaptability of the built environment. For the users, a built environment meeting their basic needs is part of sustainable development. Identified short-range renovation needs include eliminating damp and mould problems, improving energy and eco-efficiency, removing obstacles to mobility and adapting buildings to accommodate the needs of the elderly. Vacated areas and buildings should be recycled and offered a new life supporting a sense of community and service production. Improved energy efficiency reduces greenhouse gas emissions. Instead of renovating individual buildings, renovation of the entire area is recommended. Sustainability in construction translates into favouring recycling and renewable materials and building-specific energy systems using renewable and/or low-emission resources. It is recommended that renovations to improve energy efficiency are scheduled to coincide with other maintenance/ renovations so as to reduce costs. In renovation construction, the role of service improvement is more important than products. Improved services help to identify a solution that fulfils several customer needs, meets financial limitations and can be implemented efficiently. Companies are advised to view renovation construction as an innovative market segment entitled to its own service portfolio. Truths about new building should be discarded and new services developed based on recent study results and new technologies. (orig.)

  3. Maintenance and operation of a hydroelectric unit of energy in a power system using virtual reality

    Energy Technology Data Exchange (ETDEWEB)

    de Sousa, Marcos Paulo Alves [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil); Emilio Goeldi Museum, Service Data Processing Department, Perimetral Avenue No. 1901, Belem, Para (Brazil); Filho, Manoel Ribeiro; Nunes, Marcus Vinicius Alves; Lopes, Andrey da Costa [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil)

    2010-07-15

    This paper presents a new approach to training for hydroelectric unit of energy (HUE) by using virtual reality Non-immersive techniques. The software offers two modules of training: maintenance and operation. The first module, maintenance, uses the learning approach based on practice and offers different training levels, divided into three modes: automatic, guided, and exploratory, in which these modes are accessed according to the acquired degree of knowledge by the trainee in relation to maintenance procedures. The second module, allows the trainee to visualize the operation of HUE during a certain event as the electromechanical dynamics of the turbine-generator assemblage in the virtual world by the visualization of several requisite conditions before the startup-shutdown procedure of HUE. (author)

  4. Impact of improved operation and maintenance on cohesive sediment transport in Gezira Scheme, Sudan

    NARCIS (Netherlands)

    Osman, I.S.E.

    2015-01-01

    Summary

    Efficient operation and maintenance of irrigation schemes are needed for improving the hydraulic performance of the canals, enhancing the crop yields and insuring sustainable production. There is a great need to enhance the researches and for a variety of tools such

  5. Impact of improved operation and maintenance on cohesive sediment transport in Gezira Scheme, Sudan

    NARCIS (Netherlands)

    Osman, I.S.E.

    2015-01-01

    Summary

    Efficient operation and maintenance of irrigation schemes are needed for improving the hydraulic performance of the canals, enhancing the crop yields and insuring sustainable production. There is a great need to enhance the researches and for a variety of tools such

  6. Neural Pathway of Renovative and Innovative Products Appreciation

    Science.gov (United States)

    Huang, Furong; Chiu, Chiyue; Luo, Jing

    2016-12-01

    According to the level of change an invention makes on existing things and how it overrides people’s mental schemas on established categories, new inventions can be classified into two groups: incremental inventions (i.e., renovations), which make minor improvements on existing designs, and radical inventions (i.e., innovations), which make major developments that enable people to do things they have never been able to do before. Although innovation and renovation are two fundamentally different types of creation that feature new changes ranging from those in product development to those in large scale social changes, and people tend to report higher subjective preferences for incremental inventions compared to radical inventions, the cognitive brain mechanisms underlying the mental representation of these two types of inventions remains unknown. Through the use of innovative and renovative designs as materials, we found that relative to non-creative designs, creative (renovative &innovative) designs enhanced memory or association-related activation in the right parahippocampus. In particular, innovations evoked more activation in the conceptual pathway for representing objects than did renovations, whereas renovations evoked more activation in the motor pathway than innovations. These results suggest that operating experiences may provide advantages for understanding and appreciating creative designs.

  7. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  8. IT系统运维管理研究%Operation and Maintenance Management of IT Systems

    Institute of Scientific and Technical Information of China (English)

    必龙; 赵晶浩; 张璇; 赵满

    2013-01-01

    Based on all aspects of the ITIL service support management processes, this paper has analyzed IT operation and maintenance service management, and proposed a operation and maintenance management framework from project development to eventually run on the basis of the original process. The framework includes the development maintenan-ce and operation maintenance, the development phase record the project development tasks and solutions and control the progress of the development through the document management, project dynamic management, progress monitoring and knowledge management. In the maintenance stage, according to incident management, problem management, confi-guration management and knowledge management processes to monitor the operational status of the system, resolve the failure quickly and in a timely during the runtime of IT system. IT systems feedback information to the operation and maintenance department through the Help-Desk, and it is convenient for operation and maintenance department to manage IT systems uniformly.%  基于ITIL服务支持管理流程的各个方面,对IT运维服务管理进行了探析,并在原有流程的基础上提出了从项目开发到最终运行全阶段的运维管理框架。该框架包括开发维护和运行维护两部分,开发阶段通过文档管理、项目动态、进度监控和知识管理将项目开发时的任务和解决方案进行记录,并控制开发进度;维护阶段按照事件管理、问题管理、配置管理和知识管理这样的流程监控系统的运行状况,快速及时地解决系统运行时的故障。 IT系统通过服务台将自身的运维信息反馈到运维部门,方便了运维部门进行统一管理。

  9. OBSOLESCENCE ANALYSIS OF MAINTENANCE AND OPERATION OF PUBLIC TRANSPORT SYSTEMS. CASE STUDY: TRAMWAY OF ORADEA

    Directory of Open Access Journals (Sweden)

    CSUZI I.

    2015-12-01

    Full Text Available Maintenance of transport infrastructure and vehicles is important cost element of the budget of local transport companies, cost reduction is optimized by adapting appropriate strategies. Obsolescence can directly and indirectly influence the operation and maintenance of public transport systems. Challenged by the technical wear and lack of spare parts, it is impossible to cover increased needs with amenities to the given level. The reliability and availability of transport systems will be adapted at minimal cost and maximum safety criteria. Case study: the tram system in Oradea.

  10. On risk-based operation and maintenance of offshore wind turbine components

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study...... of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect...

  11. Risk-Based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    Operation and maintenance (O&M) are large contributors to the cost of energy for offshore wind turbines. Optimal planning of O&M should include use of inspections and monitoring results to make decisions that minimize the expected costs through the lifetime of the structures. For offshore...... structures it is especially important because of the dependence on weather windows for inspections and repairs to be possible. A model has been developed to estimate the expected costs to corrective and condition based maintenance for a wind turbine with a single component. The deterioration of the component...... is simulated, and the expected costs are found for different strategies. An application example shows that condition based maintenance has the potential of reducing the costs, and a risk based approach can be used to find the optimal strategy for O&M. Further the influence of failure rate and damage parameters...

  12. A Computer-aided Application for Modeling and Monitoring Operational and Maintenance Information in Mining Trucks

    Science.gov (United States)

    Nikulin, Christopher; Ulloa, Andres; Carmona, Carlos; Creixell, Werner

    2016-09-01

    The combination of maintenance planning and key performance indicators are relevant to create a more holistic scenario of the mining activities. On the one hand, reliability and maintainability are system characteristics suitable for planning maintenance strategies. On the other hand, key performance indicators are suitable to analyze cost and resource consumption information about mining equipment. Nevertheless in practice, both approaches are modeled separately and frequently by different team-works of a mining company. With this in mind, a computer-aided application was conceived to drive with better efficacy the operational and maintenance strategy in a complex process where the equipment is in continuous movement such as the transportation process in an open-mine pit.

  13. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    Directory of Open Access Journals (Sweden)

    Mihai Florian

    2015-09-01

    Full Text Available Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair and replacement activities as well as large revenue losses, mainly in the case of offshore wind farms. The recent development and evolution of condition monitoring techniques, as well as the fact that an increasing number of installed turbines are equipped with online monitoring systems, offers a large amount of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law approach. The model is used within a risk-based maintenance decision framework to optimize maintenance planning for the blades lifetime.

  14. Heat pumps: planning, optimisation, operation and maintenance; Waermepumpen. Planung - Optimierung - Betrieb - Wartung

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, P. [Kunz-Beratungen, Dietlikon (Switzerland); Afjei, T. [Fachhochschule Nordwestschweiz, Institut fuer Energie am Bau, Muttenz (Switzerland); Betschart, W.; Prochaska, V. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland); Hubacher, P. [Hubacher Engineering, Engelburg (Switzerland); Loehrer, R. [Scheco AG, Winterthur (Switzerland); Mueller, A. [Mueller und Pletscher AG, Winterthur (Switzerland)

    2008-01-15

    This handbook issued by the Swiss Federal Office of Energy (SFOE) in co-operation with a trade publication takes a look at the planning, optimisation, operation and maintenance of heat pumps. First of all, the basics of heat pump technology, heat pump components and refrigerants are discussed. Then, heat sources and heat distribution are looked at, followed by chapters on the integration of heat pumps into heating systems and noise protection topics. The definition of projects, commissioning and operation of heat pump systems are then discussed. Examples of installations round off the handbook.

  15. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    Science.gov (United States)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  16. The Development and Application of a Value-Driven Aircraft Maintenance Operations Performance Assessment Model combined with Real Options Analysis

    NARCIS (Netherlands)

    Goossens, H.G.; Beelaerts van Blokland, W.W.A.; Curran, R.

    2011-01-01

    This research paper presents the results from the development of an Aircraft Maintenance Operations Performance Assessment Model (AMOPAM). The AMOPAM is able to assess the differences in performance in between two different states or scenarios of aircraft maintenance operations and is able to captur

  17. 40 CFR 63.2163 - If I monitor fermenter exhaust, what are my monitoring installation, operation, and maintenance...

    Science.gov (United States)

    2010-07-01

    ... Hazardous Air Pollutants: Manufacturing of Nutritional Yeast Testing and Initial Compliance Requirements... are my monitoring installation, operation, and maintenance requirements? 63.2163 Section 63.2163... maintenance requirements? (a) Each CEMS must be installed, operated, and maintained according to the...

  18. The Development and Application of a Value-Driven Aircraft Maintenance Operations Performance Assessment Model combined with Real Options Analysis

    NARCIS (Netherlands)

    Goossens, H.G.; Beelaerts van Blokland, W.W.A.; Curran, R.

    2011-01-01

    This research paper presents the results from the development of an Aircraft Maintenance Operations Performance Assessment Model (AMOPAM). The AMOPAM is able to assess the differences in performance in between two different states or scenarios of aircraft maintenance operations and is able to

  19. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Science.gov (United States)

    2010-04-01

    ... maintenance assessment rate for the irrigation facility servicing my farm unit? 171.500 Section 171.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND... annual operation and maintenance assessment rate for the irrigation facility servicing my farm unit?...

  20. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  1. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  2. Organizational Culture Influence On Total Productive Maintenance (TPM and Operational Performance Using RASCH Model Analysis

    Directory of Open Access Journals (Sweden)

    Mohd Norhasni Mohd Asaad

    2014-02-01

    Full Text Available Abstract. Market globalization, competitive product and services, high economic crises are the most critical factors that influence the success of the manufacturing companies in global market. Therefore it is critical to the manufacturing companies to be efficient in production and lean tool may used to achieve that.  The most frequently used is the Total Preventive Maintenance (TPM, even though there are many studies have been conducted in relation to the TPM but there is limited research in investigating the effects of the TPM on operational performance. However, the result of the studies was not consistent, where TPM practice may have positive and negative impact on operational performance. Among the reason is the culture of the organization that influenced the implementation of TPM and operational performance. Due to that this study attempts to investigate the influence of organizational culture on the TPM implementation and operational performance.  Rasch model is used in this study due to its ability in interpreting and analyzing the ability of respondents in performing the difficult items. The online questionnaires were distributed to 63 randomly selected automotive companies located at Northern Region of Malaysia.  Results of the study revealed that the organizational culture has influenced on the successful implementation of TPM and operational performance. Therefore by the implementation of TPM in outstanding organizational culture can improve operational performance.   Keyword: Total Preventive Maintenance (TPM, Lean manufacturing, Operational performance, Organizational culture, Rasch modeldoi:10.12695/ajtm.2013.6.2.2How to cite this article:Mohd Asaad, M.N and Yusoff, R.Z. (2013. Organizational Culture Influence On Total Productive Maintenance (TPM and Operational Performance Using RASCH Model Analysis . The Asian Journal of Technology Management 6 (2: 72-81. Print ISSN: 1978-6956; Online ISSN: 2089-791X.  doi:10.12695/ajtm

  3. Teaching Laboratory Renovation

    Energy Technology Data Exchange (ETDEWEB)

    Al-Zuhairi, Ali Jassim; Al-Dahhan, Wedad; Hussein, Falah; Rodda, Kabrena E.; Yousif, Emad

    2016-12-21

    Scientists at universities across Iraq are actively working to report actual incidents and accidents occurring in their laboratories, as well as structural improvements made to improve safety and security, to raise awareness and encourage openness, leading to widespread adoption of robust Chemical Safety and Security (CSS) practices. The improvement of students’ understanding of concepts in science and its applications, practical scientific skills and understanding of how science and scientists work in laboratory experiences have been considered key aspects of education in science for over 100 years. Facility requirements for the necessary level of safety and security combined with specific requirements relevant to the course to be conducted dictate the structural design of a particular laboratory, and the design process must address both. This manuscript is the second in a series of five case studies describing laboratory incidents, accidents, and laboratory improvements. We summarize the process used to guide a major renovation of the chemistry instructional laboratory facilities at Al-Nahrain University and discuss lessons learned from the project.

  4. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    Energy Technology Data Exchange (ETDEWEB)

    DALE, R.N.

    2000-05-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

  5. Hot cell renovation in the spent fuel conditioning process facility at the Korea Atomic Energy Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Seung Nam; Lee, Jong Kwang; Park, Byung Suk; Cho, Il Je; Kim, Ki Ho [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    The advanced spent fuel conditioning process facility (ACPF) of the irradiated materials examination facility (IMEF) at the Korea Atomic Energy Research Institute (KAERI) has been renovated to implement a lab scale electrolytic reduction process for pyroprocessing. The interior and exterior structures of the ACPF hot cell have been modified under the current renovation project for the experimentation of the electrolytic reduction process using spent nuclear fuel. The most important aspect of this renovation was the installation of the argon compartment within the hot cell. For the design and system implementation of the argon compartment system, a full-scale mock-up test and a three-dimensional (3D) simulation test were conducted in advance. The remodeling and repairing of the process cell (M8a), the maintenance cell (M8b), the isolation room, and their utilities were also planned through this simulation to accommodate the designed argon compartment system. Based on the considered refurbishment workflow, previous equipment in the M8 cell, including vessels and pipes, were removed and disposed of successfully after a zoning smear survey and decontamination, and new equipment with advanced functions and specifications were installed in the hot cell. Finally, the operating area and isolation room were also refurbished to meet the requirements of the improved hot cell facility.

  6. Towards maintenance-free SOVs (solenoid operated valves). [For nuclear power plant use

    Energy Technology Data Exchange (ETDEWEB)

    Rustagi, R. (Valcor Engineering Corp., Springfield, NJ (USA))

    1991-05-01

    Because most solenoid operated valves (SOVs) are being used in vital safety related systems in nuclear power plants, they must be shown to perform satisfactorily over 40 years of normal service plus one year into post-LOCA. Current practice in SOV design and manufacture, as described here, aims to minimize the need for maintenance and to make it simpler when it is necessary. (author).

  7. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.; French, R.E.; Isidoro, R.J.; Kaestner, P.C.; Perkins, W.G.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  8. Analysis of operation and maintenance strategies for floating offshore wind farms

    OpenAIRE

    Brons-Illing, Christopher

    2015-01-01

    This report describes the computations that have been made to simulate the O&M cost for a generic floating offshore wind farm. The aim of this paper is to investigate if the floating foundation technology offers new approaches for the way offshore wind power plants are operated and maintained. The possibility to return the semisubmersible wind turbine to shore, allows that maintenance activities could be carried out near to shore (for example in a dry dock) with fewer restrictions...

  9. User Charge Revenues for Wastewater Treatment Plants--Insufficient to Cover Operation and Maintenance.

    Science.gov (United States)

    1981-12-02

    AD-All 588 SEMERAL ACCOUNTINq OFFICE WASHINGTON DC COMUNITY AN--ETC F/S 13/2 USER CHARGE REVENUES FOR WASTEWATER TREATMENT PLANTS--INSUFFICI--ETC(U...COMPTROLLER GENERAL 0 Report To The Congress OF THE UNITED STATES User Charge Revenues For Wastewater = Treatment Piants-Insutficient To Cover Operation And...Maintenance Half of the 36 municipal wastewater treatment plants GAO reviewed in 10 States were not raising sufficient funds from their user charge iP

  10. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  11. Development of a method for holistic energy renovation

    DEFF Research Database (Denmark)

    Morelli, Martin

    Development of a method for holistic energy renovation During the last decade, the European Union has worked intensively to improve the energy efficiency in the building sector, aiming at liberation from the use of fossil fuels. The focus has shifted from new energy efficient buildings towards...... building with a new building. Secondly, the design of energy saving measures was assessed whether to re-design, formulate a maintenance plan or assess the durability....

  12. Extensive renovation the pathology of heritage building

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2015-01-01

    The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures.......The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures....

  13. Extensive renovation the pathology of heritage buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2015-01-01

    The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures.......The pathology of heritage buildings is often related to renovation initiatives typically initiated by implementing energy savings measures....

  14. Framing resident acceptance of sustainable renovation

    NARCIS (Netherlands)

    Boess, S.U.

    2015-01-01

    This paper presents the initial theoretical framework adopted for a study into resident acceptance of sustainable renovation. Seven expert interviews and two retrospective case studies revealed that the relationship between social housing residents and the renovation process requires careful attenti

  15. On risk-based operation and maintenance of offshore wind turbine components

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study...... of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect...... inspections. Finally the influence of different important parameters, e.g. failure rate, reliability of inspections, inspection interval, and decision rule for repairs, is evaluated....

  16. Augmented Reality to Support On-Field Post-Impact Maintenance Operations on Thin Structures

    Directory of Open Access Journals (Sweden)

    Luca De Marchi

    2013-01-01

    monitored and a signal processing algorithm (the Warped Frequency Transform able to compensate for dispersion the acquired waveforms. The compensated waveforms yield to a robust estimation of Lamb waves difference in distance of propagation (DDOP, used to feed hyperbolic algorithms for impact location determination, and allow an estimation of the uncertainty of the impact positioning as well as of the impact energy. The outputs of the impact methodology are passed to a visualization technology that yielding their representation in Augmented Reality (AR is meant to support the inspector during the on-field inspection/diagnosis as well as the maintenance operations. The inspector, in fact, can see interactively in real time the impact data directly on the surface of the structure. To validate the proposed approach, tests on an aluminum plate are presented. Results confirm the feasibility of the method and its exploitability in maintenance practice.

  17. The Renovation and Future Capabilities of the Thacher Observatory

    Science.gov (United States)

    O'Neill, Katie; Osuna, Natalie; Edwards, Nick; Klink, Douglas; Swift, Jonathan; Vyhnal, Chris; Meyer, Kurt

    2016-01-01

    The Thacher School is in the process of renovating the campus observatory with a new meter class telescope and full automation capabilities for the purpose of scientific research and education. New equipment on site has provided a preliminary site characterization including seeing and V-band sky brightness measurements. These data, along with commissioning data from the MINERVA project (which uses comparable hardware) are used to estimate the capabilities of the observatory once renovation is complete. Our V-band limiting magnitude is expected to be better than 21.3 for a one minute integration time, and we estimate that milli-magnitude precision photometry will be possible for a V=14.5 point source over approximately 5 min timescales. The quick response, autonomous operation, and multi-band photometric capabilities of the renovated observatory will make it a powerful follow-up science facility for exoplanets, eclipsing binaries, near-Earth objects, stellar variability, and supernovae.

  18. Method for planning extensive energy renovation of detached single-family houses

    DEFF Research Database (Denmark)

    Grøn Bjørneboe, Matilde

    . This will take time, so both areas must be considered already now, but it will be beneficial to work on reducing the consumption before the sustainable energy supply is fully developed, so that we can avoid expensive over-production. Some 30% of the total energy consumption in Denmark takes place in households...... that the use of this approach produced a better renovation with a larger energy saving. The initial evaluation helped the house owners identify a maintenance backlog, and the use of an independent advisor helped ensure quality throughout the process. Renovations are too often carried out for just one purpose......: maintenance, to update functions or to reduce energy consumption. But a lot can be gained by combining these efforts, which can reduce expenses for planning and execution and avoid doing things twice. Research for this thesis demonstrated this approach by carrying out a renovation based on maintenance...

  19. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Science.gov (United States)

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. (a) Organized and... 26 Internal Revenue 7 2010-04-01 2010-04-01 true Organized and operated to provide for the acquisition, construction, management, maintenance and care of association property. 1.528-2 Section...

  20. Energy renovation of the apartment building Langkaerparken, Tilst, AArhus; Denmark; Energioptimering af etageboligblok Langkaerparken, Tilst, AArhus

    Energy Technology Data Exchange (ETDEWEB)

    Heiselberg, P.

    2010-06-15

    The project's aim was to develop a method and examples of design of energy extensive renovations (low energy class 1) to stimulate energy conservation and increased use of renewable energy in existing buildings. The present report deals with energy renovation of an apartment housing estate. The focus has been to choose simple solutions that do not require large technical knowledge by the residents or operational staff. The project shows that it currently is not profitable to renovate for energy low energy class 2, 1 or 0. With a lifespan of 30 years, however, renovation to low energy class 2 will be viable. Should it be viable for the residents to energy renovate more, financial support is needed. (ln)

  1. Sustainable Home Renovation for Canadians

    NARCIS (Netherlands)

    McKellar, G.

    2011-01-01

    This "designers' manual" is made during the TIDO-course AR0531 Smart & Bioclimatic Design. There is a staggering amount of existing buildings in Canada which were not built to e efficient, sustainable homes. This manual gives openings for renovating your home efficiently by providing practical info

  2. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality

  3. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  4. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  5. Risk-based Operation and Maintenance Approach for Wave Energy Converters Taking Weather Forecast Uncertainties into Account

    DEFF Research Database (Denmark)

    Ambühl, Simon; Kramer, Morten Mejlhede; Sørensen, John Dalsgaard

    2016-01-01

    Inspection and maintenance costs are significant contributors to the cost of energy for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs. Furthermore, helicopter and boat can be used to transport equipment and personnel...... to the device for operation and maintenance actions. This article focusses on a risk-based inspection and maintenance planning approach involving minimization of the overall repair costs including costs due to lost electricity production. The study includes real weather data and damage accumulation as well...... as uncertainties related with imperfect weather forecasts, costs, structural damage accumulation, inspection accuracy and the applied maintenance strategies. This article contains a case study where the risk-based maintenance strategy is applied for the Wavestar device....

  6. INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS

    Energy Technology Data Exchange (ETDEWEB)

    JOLLEY, WENDELL L

    2008-02-05

    On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

  7. Precursor Report of Data Needs and Recommended Practices for PV Plant Availability Operations and Maintenance Reporting.

    Energy Technology Data Exchange (ETDEWEB)

    Hill, Roger R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Integration; Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Photovoltaic and Distributed Systems Integration; Balfour, John R. [High Performance PV, Phoenix, AZ (United States)

    2015-01-01

    Characterizing the factors that affect reliability of a photovoltaic (PV) power plant is an important aspect of optimal asset management. This document describes the many factors that affect operation and maintenance (O&M) of a PV plant, identifies the data necessary to quantify those factors, and describes how data might be used by O&M service providers and others in the PV industry. This document lays out data needs from perspectives of reliability, availability, and key performance indicators and is intended to be a precursor for standardizing terminology and data reporting, which will improve data sharing, analysis, and ultimately PV plant performance.

  8. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  9. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    Energy Technology Data Exchange (ETDEWEB)

    Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  10. Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy

    Energy Technology Data Exchange (ETDEWEB)

    Maples, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hand, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); van de Pietermen, R. [Energy Research Center of the Netherlands (Netherlands); Obdam, T. [Energy Research Center of the Netherlands (Netherlands)

    2013-07-01

    Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

  11. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers

    Energy Technology Data Exchange (ETDEWEB)

    MORTIMER, C.S.

    1999-08-25

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. This procedure sets forth system operations which include type and frequency of required maintenance as well as system failure response procedures. The system consists of a sanitary sewage holding tank, two alarms and appurtenances necessary to provide a functional system. The maximum daily design flow is 696 liters. The holding tank is located as shown on the site plan.

  12. Development of ergonomics audits for bagging, haul truck and maintenance and repair operations in mining.

    Science.gov (United States)

    Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G

    2017-06-18

    The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.

  13. Launch Complex 39A, SWMU 008, Operations, Maintenance, and Monitoring Report, Kennedy Space Center, FL

    Science.gov (United States)

    Wilson, Deborah M.

    2016-01-01

    This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from Year 1 operation of the air sparging (AS) groundwater interim measure (IM) for High-Concentration Plumes (HCPs) and Low-Concentration Plumes (LCPs) within the perimeter fence line at Launch Complex 39A (LC39A) located at Kennedy Space Center (KSC), Florida. The objective of the LC39A groundwater IM is to actively decrease concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC) in groundwater in the HCP and LCP within the pad perimeter fence line via AS to levels less than Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTLs). The objective was developed because LC39A is currently being leased to Space Exploration Technologies (SpaceX), and the original IM for monitored natural attenuation (MNA) over an extended period of time was not suitable for future planned site use.

  14. M3A system (2000–2005 – operation and maintenance

    Directory of Open Access Journals (Sweden)

    G. Petihakis

    2006-05-01

    Full Text Available During the Pilot Phase of the Mediterranean Forecasting System (MFSPP (1998–2001 a prototype observing system (Mediterranean Moored Multi-sensor Array – M3A was designed, developed and operated in the Cretan Sea for continuous oceanographic measurements in real time. The main problems encountered were associated with biofouling, underwater and aerial communication and with the design of the surface buoy. In the second phase of the MFS project named Mediterranean Forecasting System Towards Environmental Predictions (MFSTEP (2001–2005, the aim was to solve those problems and to consolidate the M3A. During the approximately five years of operation there were 13 scheduled and 15 emergency visits with a total duration of 65 days. The acquired experience through the maintenance program proved that the continuous observation of a so important system with a relative low cost is feasible.

  15. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  16. Remote operation systems and development cooperation, future couple in alternative energy sources; Telegestion y cooperacion al desarrollo, binomio de futuro en energias renovables

    Energy Technology Data Exchange (ETDEWEB)

    Borge Diez, D.

    2008-07-01

    Despite of the rising in the fuel and its by-products, alternative energy sources have not vet developed specially in small plants for local generation. Thermal solar energy and biomass could provide most of the thermal energy required in the residential and commercial buildings and provide new solutions such as solar cooling, but people usually distrust because of its difficulties to be operated by no expert staff. In this situation remote operation systems are necessary to increase the number of installations and increase the sales. In the same way these kinds of systems could increase the technology exports to development countries where alternative energy sources can provide energy generation solutions that would improve the quality of life. (Author) 6 refs.

  17. Renovation work at Building 280

    CERN Multimedia

    EN Department

    2010-01-01

    Processing units and containers will be temporarily installed in front of Building 280 between 17 and 21 February 2010 while renovation work is carried out on electrical equipment. During this period, the Route FERMI, i.e. the area between Buildings 280 and 530, will be closed to traffic. You are requested to comply with the road signs in place. Thank you for your understanding. For further information, please call 160481. EN-EL Group

  18. Upcoming renovations in Building 63

    CERN Multimedia

    2014-01-01

    La Poste will close its doors in Building 63 on Friday, 28 November. It moves to Building 510 and where it will open on 1 December (see picture).   UNIQA will close its HelpDesk in Building 63 on Wednesday, 26 November and will re-open the next day in Building 510. La Poste and UNIQA are expected to return to their renovated office space between April and May 2015.

  19. A guidebook for the operation and maintenance of HANARO seismic monitoring analysis system

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, Jeong Soo; Yoon, Doo Byung; Kim, Hyung Kyoo

    2003-09-01

    Systems and structures related to HANARO safety are classified as seismic category I. Since 1995, the seismic monitoring system has been utilized for monitoring an earthquake at the HANARO site. The existing seismic monitoring system consists of field sensors and monitoring panel. The analog-type monitoring system with magnetic tape recorder is out-of-date model. In addition, the disadvantage of the existing system is that it does not include signal-analyzing equipment. Therefore, we have improved the analog seismic monitoring system into a new digital Seismic Monitoring Analysis System(SMAS) that can offer precise and detail information of the earthquake signals. This newly developed SMAS is operating at the HANARO instrument room to acquire and analyze the signal of an earthquake. This document is a guidebook for the operation and maintenance of the SMAS. The first chapter gives an outline of the SMAS. The second chapter describes functional capability and specification of the hardware. Chapters 3 and 4 describe starting procedure of the SMAS and how to operate the seismic monitoring program, respectively. Chapter 5 illustrates the seismic analysis algorithm used in the SMAS. The way of operating the seismic analysis program is described in chapter 6. Chapter 7 illustrates the calibration procedure for data acquisition module. Chapter 8 describes the symptoms of common malfunctions and its countermeasure suited to the occasions.

  20. On Stakeholders and the Decision Making Process Concerning Sustainable Renovation and Refurbishment in Sweden, Denmark and Cyprus

    DEFF Research Database (Denmark)

    Gohardani, Navid; Björk, Folke; Jensen, Per Anker;

    2013-01-01

    . In particular, the attitude of stakeholders in Sweden, Denmark and Cyprus to sustainable building renovation/refurbishment is studied through three separate case studies. Within the framework of this study, it is identified that building physics and durability are the most important drivers for energy...... renovation. In Sweden, Denmark and Cyprus, these factors are contributed by maintenance, deterioration and moisture, respectively. The results of the questionnaires and semi-structured interviews presented herein provide an insight into the renovation process in the aforementioned countries and reveal...

  1. Using RFID Tagging in a Mining Industry Maintenance, Repair, and Operating (MRO) Supply Warehouse: A Case Study

    Science.gov (United States)

    Smith, George D.

    2008-01-01

    The use of Radio Frequency Identification (RFID) technology has been shown to be successful by reducing operating costs in the retail and manufacturing industries, but has never been considered in the literature for a mining industry maintenance, repair, and operating (MRO) supply chain. This field study was conducted to determine whether or not…

  2. Using RFID Tagging in a Mining Industry Maintenance, Repair, and Operating (MRO) Supply Warehouse: A Case Study

    Science.gov (United States)

    Smith, George D.

    2008-01-01

    The use of Radio Frequency Identification (RFID) technology has been shown to be successful by reducing operating costs in the retail and manufacturing industries, but has never been considered in the literature for a mining industry maintenance, repair, and operating (MRO) supply chain. This field study was conducted to determine whether or not…

  3. Backup power working group best practices handbook for maintenance and operation of engine generators, Volume 1. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R.; Padgett, A.B.; Burrows, K.P.; Fairchild, P.N.; Lam, T.; Janes, J.

    1997-06-01

    This handbook is divided into the four chapters. Chapter one covers the design, procurement, storage, handling and testing of diesel fuel oil to be used in DOE backup power supplies. Chapter two discusses the selection of automatic transfer switches to be used in DOE backup power supplies. Chapter three is about low voltage open frame air circuit breaker operation, testing, and maintenance for DOE backup power supplies. And chapter four covers installation, design, and maintenance of engine cooling water and jacket water systems.

  4. Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

    Science.gov (United States)

    Murphy, Alex

    2016-01-01

    This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples

  5. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and riskbased approach is presented where a life-cycle approach......Reliability analysis and probabilistic models for wind turbines are considered with special focus on structural components and application for reliability-based calibration of partial safety factors. The main design load cases to be considered in design of wind turbine components are presented...... including the effects of the control system and possible faults due to failure of electrical / mechanical components. Considerations are presented on the target reliability level for wind turbine structural components. Application is shown for reliability-based calibrations of partial safety factors...

  6. New Best-Practices Guide for Photovoltaic System Operations and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-24

    Fact sheet summarizing technical report TP-7A40-67553. As solar photovoltaic (PV) systems have continued their transition from niche applications into large, mature markets in the United States, their potential as financial investments has risen accordingly. Mainstream investors, however, need to feel confident about the risk and return of solar photovoltaic (PV) systems before committing funds. A major influence on risk and return for PV is operations and maintenance (O&M) - but O&M practices and costs vary widely across the United States, making these variables difficult for investors to predict. To address this barrier to continued PV investment, the PV O&M Working Group has developed a new best-practices guide for PV O&M.

  7. Operational safety and post-maintenance gas leak detection in GE frame 9001FA gas turbines

    Energy Technology Data Exchange (ETDEWEB)

    Farthing, D.A.; Marley, L.; Lees, J.A. [PowerGen plc, Connah' s Quay Power Station, Deeside (United Kingdom)

    1999-12-01

    The increased use of natural-gas-fuelled combined cycle gas turbine and combined heat and power plants in recent years has been accompanied by the practice of constructing acoustic enclosures around the gas turbines for environmental reasons. This can increase the risk of an explosion if, for any reason, there is a build-up of flammable gas within the enclosure, since there can be a range of possible ignition sources. The UK Health and Safety Executive consider gas leaks within such enclosures to be foreseeable, especially following maintenance. The paper presents a review of operational safety and a leak detection method for the inspection and design of flanged joints within the acoustic enclosures around GE 9001FA gas turbines, providing a practical step towards minimising the risk of explosion due to fuel leakage. (Author)

  8. Assessment of Operational Maintenance in Public Hospitals Buildings in the Gaza Strip

    Directory of Open Access Journals (Sweden)

    Adnan Enshassi

    2015-01-01

    Full Text Available The issue of public hospitals buildings’ maintenance in Palestine is regarded as a challenging issue. The lack of attention to maintenance management in hospitals has led to deterioration of buildings and reduced the health care services. The aim of this paper is to assess the current practice of maintenance process and management in public hospitals buildings in the Gaza Strip. A questionnaire survey that distributed to 13 public hospitals, which are administered by the Ministry of Health (MoH in the Gaza Strip, was used to collect the primary data for this study. The results of this study present an overview of the current situation of the maintenance process in public hospitals buildings in the Gaza Strip. The findings indicated that while the corrective maintenance is implemented in all the 13 public hospitals, preventive maintenance is employed along with corrective maintenance, only in three hospitals. In addition, the findings indicated variances in responding to maintenance requests, while 50% of the maintenance departments took few hours to respond to maintenance requests, the rest took a few days to respond, this can be explained due to lack of spare parts and qualified staff. The study showed also that there is a shortage in training the hospital facility’s users on how to report maintenance problems. The results of this study indicated that most hospitals in the Gaza Strip have no maintenance plan for medical equipment; they do not have quality control system for repair and preventive maintenance. It is recommended to employ experience maintenance staff in order to prepare adequate maintenance plan and detailed check list, which is required for preventive maintenance. The MoH should organize specialized training courses in maintenance management for their staff in order to improve their effectiveness and efficiency. Hospitals in Gaza should make sure that all spare parts available in their storages for immediate action when

  9. Air Force Armament Laboratory (AFATL) battery power supply (BPS) operations and maintenance

    Science.gov (United States)

    Delaney, J. R.; Lippert, J. R.; Herald, W. L.

    1991-01-01

    The successful operation of the AFATL BPS system is discussed in terms of its proven reliable performance record, flexibility to adapt to different test configurations, and relatively inexpensive operating maintenance costs per test. The BPS consists of 13,728 batteries, interconnecting buswork, and a power conditioning inductor. The system is subdivided into six modules, each divided into six gangs with its own gang switch, each gang containing 24 battery strings. Each module has its own main bus pair, with the negative bus common and the positive bus switched. The operational and performance history of the AFATL BPS has proven that this battery system is effective as a prime power supply for hypervelocity launcher research. Turn-around time between tests has generally been less than that required for the test article. The power capabilities of the BPS can easily be expanded to the design point of a 200 MJ energy store. This can be done by adding more modules of batteries and reconfiguring the inductor with its existing three auxiliary turns in series.

  10. On the Analysis of a Wave Energy Farm with Focus on Maintenance Operations

    Directory of Open Access Journals (Sweden)

    Giovanni Rinaldi

    2016-08-01

    Full Text Available Wave energy has a promising technical potential that could contribute to the future energy mix. However, costs related to the deployment of wave energy converters (WECs are still high compared to other technologies. In order to reduce these costs, two principle options are available, a reduction in cost and an increase in productivity. This paper presents a reliability-based computational tool to identify typical decision problems and to shed light on the complexity of optimising a wave power farm. The proposed tool is used to investigate productivity and availability of a wave energy farm during 10 years of operational life. A number of optimization possibilities to improve productivity, namely vessel choice, maintenance regime, failure rate and component redundancy, are then explored in order to assess their effectiveness. The paper quantifies the yield increase and provides a practical approach to evaluate the effectiveness of strategic and operational decision options. Results, in terms of the variations in productivity and availability of the farm, are analysed and discussed. Conclusions highlight the importance of reliability-centred simulations that consider the specific decision parameters throughout the operational life to find suitable solutions that increase the productivity and reduce the running cost for offshore farms.

  11. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  12. The maintenance rule and operational experience; La regla de manenimiento y la experiencia operativa

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, J.; Garcia, A. B.; Esteban, M. J.; Munoz, M. J.; Cabello, J. M.

    2010-07-01

    The goal of the program of the Maintenance Rule is optimize maintenance ensuring appropriate behavior, both in terms of reliability and availability, structures, systems and components (SSCs) within the scope defined against a pre-established performance criteria.

  13. A standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy

    Directory of Open Access Journals (Sweden)

    Kaska Serge C

    2010-12-01

    Full Text Available Abstract Background Intra-operative fluoroscopy for orthopaedic procedures frequently involves imaging in the horizontal plane, which requires the lower portion of the C-arm (x-ray tube to be rotated from an unsterile zone (beneath the table into the sterile field. To protect the integrity of the sterile field the C-arm must be draped repeatedly throughout the surgical case. The current, un-standardized, practice employs draping procedures which violate the Association of peri-Operative Registered Nurses (AORN Standards and Recommended Practices, waste time and material, and pose an increased risk for surgical site infection. Presentation of the hypothesis Use of a novel sterile C-arm drape (C-armor that maintains the integrity of the sterile field, will improve operating room efficiency and reduce surgical site infection risk factors. This reduction in risk factors may potentially reduce surgical site infections in orthopaedic surgical cases requiring repeated horizontal x-ray imaging. Testing the Hypothesis Savings in time and material and the reduction in surgical site infection risk factors afforded by using C-armor are intuitive to those skilled in the practice of orthopaedic surgery. Testing for a reduction in the number of microorganisms introduced to the surgical site by improved C-arm draping would be challenging due to the multiple confounding factors during a surgical operation. Determination of an absolute reduction in surgical site infections may be possible, but will require accounting for many confounding variables and a large study sample in order to achieve statistical significance. Implications of the Hypothesis Improved intraoperative workflow, healthcare savings and a reduction in surgical site infection risk factors will be achieved by utilizing a standardized and safe method of sterile field maintenance during intra-operative horizontal plane fluoroscopy.

  14. Intelligent Systems and Advanced User Interfaces for Design, Operation, and Maintenance of Command Management Systems

    Science.gov (United States)

    Mitchell, Christine M.

    1998-01-01

    Historically Command Management Systems (CMS) have been large, expensive, spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as a to develop a more generic or a set of core components for CMS systems. Current MOC (mission operations center) hardware and software include Unix workstations, the C/C++ and Java programming languages, and X and Java window interfaces representations. This configuration provides the power and flexibility to support sophisticated systems and intelligent user interfaces that exploit state-of-the-art technologies in human-machine systems engineering, decision making, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of the issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, design and analysis tools from a human-machine systems engineering point of view (e.g., operator and designer models) and human-computer interaction tools, (e.g., graphics, visualization, and animation), may provide significant savings in the design, operation, and maintenance of a spacecraft-specific CMS as well as continuity for CMS design and development across spacecraft with varying needs. The savings in this case is in software reuse at all stages of the software engineering process.

  15. A Tool to Evaluate Different Renovation Alternatives with Regard to Sustainability

    Directory of Open Access Journals (Sweden)

    Kristina Mjörnell

    2014-07-01

    Full Text Available In Sweden and in other countries, building owners are encouraged to help reduce energy consumption, both in order to contribute to national energy saving goals and, in terms of their own interests, to reduce the costs of heating and operation of the building. However, it is important to pursue the most optimal strategy available so as to achieve cost-effective energy usage while simultaneously maintaining excellent indoor environments, without sacrificing the architectural quality or negatively affecting the environment. Building managers often do not have the time or expertise required to make a proper evaluation of the available options before making a final decision. Renovation measures are often considered in the light of repaying investments in a short time rather than taking into account life cycle costs, despite the fact that a thoughtful, comprehensive renovation is often more cost-effective in the long run. This article presents a systematic approach for evaluating different renovation alternatives based on sustainability criteria. A methodology has been developed to evaluate different renovation alternatives from environmental, economic, and social perspectives. The benefit of using the proposed methodology is that building managers who face a major renovation work are provided with a clear comparison between the different renovation options, viewed from a sustainability perspective, this may facilitate, in the long run, a culture in which renovation measures which involve marginally increased costs, but are seen to lead to significant environmental and social benefits, will be considered and carried out.

  16. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Science.gov (United States)

    2010-10-01

    ... periodic maintenance. (iv) A diagram of lubrication points with the recommended lubricants. (v) A list of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair... instructions or as set out in the shipboard planned maintenance program. (2) Launching appliances must...

  17. The renovation of the Main Building is approaching completion

    CERN Document Server

    Anaïs Schaeffer

    2011-01-01

    The renovation work under way in the CERN Main Building should be completed by June. From the floors to the ceilings, everything has been done to give this historic building a new lease of life.     Taken in the early 60s, this picture illustrates how light maintenance was a challenge for the auditorium in CERN’s main building.   Nobody who has recently had to shimmy between the cables, ladders and toolboxes deposited around the main hall of Building 500 to get to the post office, the bank or Restaurant 1 can be oblivious to the fact that the ground floor of the Main Building has been getting a face-lift. The renovation work, which started with the first-floor concourse in June 2010, should be finished over the next couple of months. The first-floor renovations, now almost complete, set the tone for the rest of the project. The floor and ceiling, both fitted with special acoustic materials for efficient noise damping, have been completely refurbished and the Building ...

  18. Integrated project delivery methods for energy renovation of social housing

    Directory of Open Access Journals (Sweden)

    Tadeo Baldiri Salcedo Rahola

    2015-11-01

    construction projects with a high commitment to sustainability in general and for energy performance in particular. The literature review also reveals that the key factor in the process efficiency of all project delivery methods is collaboration between the actors involved in the project.Partnering methods can have a substantial positive influence on process performance. The study of the legal limitations imposed by the currently applicable public procurement Directive 2004/18/EC shows that even though a limited amount of tender options are available, is it possible to tender projects that apply integrated project delivery methods using the competitive dialogue procedure. Moreover, the recently approved but not yet enacted public procurement Directive 2014/24/ EU facilitates even further the use of competitive dialogue tenders for social housing energy renovations.Project delivery methods in European social housing energy renovationsThis study is based on five case studies, 36 questionnaires and 14 expert interviews, and identified four main project delivery methods for the energy renovation of social housing, namely:Step-by-Step (SBSDesign-Bid-Build (DBBDesign-Build (DBDesign-Build-Maintain (DBM.SBS can be considered a major renovation when the replacement of a series of building components eventually produces the same final result as a renovation project. In order to optimise the service lives of building components, an SHO might choose to split a major renovation project into a series of minor renovations. Cost-efficiency is achieved by procuring a large number of replacements only when a particular component has reached the end of its service life. This project delivery method will not usually include a design phase because these interventions usually involve replacing building products and systems. DBB, DB and DBM take place all at once and involve design companies, construction companies and maintenance companies. The difference between the three methods is the time

  19. Optimising power plant operation - high availability at low maintenance costs; Optimierung des Kraftwerksbetriebs - hohe Verfuegbarkeit trotz geringer Instandhaltungskosten

    Energy Technology Data Exchange (ETDEWEB)

    Kienreich, A.; Maagh, P.; Gilow, C.; Suerig, C.; Vahlenkamp, T. [McKinsey and Co., Inc., Duesseldorf (Germany)

    2008-01-15

    Most power plant operators responded to the liberalisation of the European energy markets by lowering their costs. The measures they took to this end such as lengthening maintenance intervals, cutting down on operating staff and progressively outsourcing maintenance services have indeed had an impact, albeit not as intended. In the meantime some power plants are showing first signs of impaired availability and reliability, both of which criteria had begun to play a more prominent role again in recent years. Today's challenge on power supply companies therefore is to optimise the costs and availability of their plants simultaneously. The ''McKinsey Power Gauge'', a Europe-wide benchmarking system provides assistance in identifying successful operating and maintenance strategies.

  20. Aspinall Courthouse: GSA's Historic Preservation and Net-Zero Renovation Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Chang, R.; Hayter, S.; Hotchkiss, E.; Pless, S.; Sielcken, J.; Smith-Larney, C.

    2014-10-01

    The federal government is mandated with improving efficiency of buildings, incorporating renewable energy, and achieving net-zero energy operations where possible. These challenges led GSA to consider aligning historic preservation renovations with net-zero energy goals. The Wayne N. Aspinall Federal Building and U.S. Courthouse (Aspinall Courthouse), in Grand Junction, Colorado, is an example of a renovation project that aimed to accomplish both historic preservation and net-zero energy goals.

  1. Operations, Maintenance, and Replacement 10-Year Plan 1990-1999 : Environmental Strategy. Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-09-01

    In operating and maintaining its regional power transmission system, Bonneville Power Administration (BPA) must address environmental concerns. Pollution sources and pathways for pollution migration, including potential contamination from hazardous or toxic materials, are present. BPA must develop and follow precautionary measures, respond to emergencies, minimize wastes, redress past problems, alert and train employees to problems and safety needs, constantly evaluate this effort and update the program for improvements and changes in regulations and technology. Part of BPA's mission is to conduct its operation, maintenance, and replacement programs in an environmentally sound manner. BPA recognizes its responsibility to be good stewards of the environment. BPA will meet its environmental obligations as set forth in environmental laws and regulations. BPA intends to make consistent and measurable progress toward meeting these responsibilities. The target for the 10-Year Plan is to achieve environmental compliance and meet the following goals: (1) protect human health and the environment; (2) avoid or limit liability (3) set up an effective internal management structure to maintain compliance; and (4) achieve cost-effective compliance. 6 figs.

  2. M3A system (2000–2005 – operation and maintenance

    Directory of Open Access Journals (Sweden)

    G. Petihakis

    2007-01-01

    Full Text Available During the pilot phase of the Mediterranean Forecasting System (MFSPP (2000 2003, a prototype observing system (Mediterranean Moored Multi-sensor Array – M3A was designed, developed and operated in the Cretan Sea for continuous oceanographic measurements in real time. The main problems encountered were associated with biofouling, underwater and aerial communication and with the design of the surface buoy. In the second phase of the MFS project named Mediterranean Forecasting System Towards Environmental Predictions (MFSTEP (2003–2005, the aim was to solve those problems and to consolidate the M3A. For the minimisation of biofouling a pilot field study was performed and the techniques of bromine solution and copper shielding were evaluated. Additionally, the oligotrophy of the Aegean Sea dictated the need to ignore factory calibrations and to perform site-specific laboratory calibrations of the sensors. This procedure was proved necessary and produced calibration coefficients that gave results comparable to the measurements obtained with the laboratory analysis method. During the approximately five years of operation, there were 13 scheduled and 15 emergency visits, with a total duration of 65 days. The acquired experience through the maintenance program proved that the continuous observation of such a very important system with a relative low cost is feasible.

  3. Survey of operation and maintenance-related materials needs in geothermal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Allan, M.L.

    1998-06-01

    A survey was conducted to determine operation and maintenance (O and M)-related materials needs in geothermal power plants and to identify future research and development to address these needs. A total of 44 questionnaires was mailed to geothermal plant operators and industry consultants. The response rate was 54%. The participants were asked to describe type and frequency of materials problems, strategies currently used to mitigate such problems, barriers to using new or alternative materials and technologies, sources of information and give their views on research and development priorities. A wide range of opinions was obtained, reflecting each individual respondent`s perspective and the site-specific nature of some problems. However, the consensus is that corrosion and scaling remain major issues and that components requiring performance improvements include pipelines, well casing, turbines, heat exchangers, condensers, valves and cooling towers. It is recommended that appropriate research and development continue to be directed at reducing O and M costs associated with materials failure or inadequate service. There should be a balance between optimizing existing materials through better design and understanding of behavior in geothermal environments and development of new materials. Life extension of existing equipment, service life prediction, education of plant personnel in materials and methods for mitigating corrosion, and improvements in inhibitors and biocides would also be beneficial.

  4. SURVEY OF OPERATION AND MAINTENANCE-RELATED MATERIALS NEEDS IN GEOTHERMAL POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    ALLAN,M.L.

    1998-06-01

    A survey was conducted to determine operation and maintenance (O and M)-related materials needs in geothermal power plants and to identify future research and development to address these needs. A total of 44 questionnaires was mailed to geothermal plant operators and industry consultants. The response rate was 54%. The participants were asked to describe type and frequency of materials problems, strategies currently used to mitigate such problems, barriers to using new or alternative materials and technologies, sources of information and give their views research and development priorities. A. wide range of opinions was obtained, reflecting each individual respondent's perspective and the site-specific nature of some problems. However, the consensus is that corrosion and scaling remain major issues and that components requiring performance improvements include pipelines, well casing, turbines, heat exchangers, condensers, valves and cooling towers. It is recommended that appropriate research and development continue to be directed at reducing O and M costs associated with materials failure or inadequate service. There should be a balance between optimizing existing materials through better design and understanding of behavior in geothermal environments and development of new materials. Life extension of existing equipment, service life prediction, education of plant personnel in materials and methods for mitigating corrosion, and improvements in inhibitors and biocides would also be beneficial.

  5. Natural gas distribution operation and maintenance dissemination project Kaunas City, Lithuania. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The main objective of this project has been to disseminate the results and experiences achieved during the former projects in Kaunas to other Lithuanian gas companies and the gas sector in general. Also new subjects selected in co-operation with Kaunas Gas Company, the Lithuanian Energy Institute and the Lithuanian Gas Training Centre, where improvements were required, have been implemented. The components of the project were the following: (1) A training course in cathodic protection. One course concerning measuring and registration and one course concerning design and implementation. (2) A pilot project to develop methods for measuring cathodic protection on coherent steel pipe network. (3) Analysis of gas losses related to types of gas meters and calibration of meters. (4) A training course and technology transfer concerning relations between gas companies and consumers. (5) Dissemination of the experience of 1998 from the preparation of an operation and maintenance manual for Kaunas Gas Company. Dissemination of the ideas to other Lithuanian gas companies. (EHS)

  6. Survey of operation and maintenance-related materials needs in geothermal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Allan, M.L.

    1998-06-01

    A survey was conducted to determine operation and maintenance (O and M)-related materials needs in geothermal power plants and to identify future research and development to address these needs. A total of 44 questionnaires was mailed to geothermal plant operators and industry consultants. The response rate was 54%. The participants were asked to describe type and frequency of materials problems, strategies currently used to mitigate such problems, barriers to using new or alternative materials and technologies, sources of information and give their views on research and development priorities. A wide range of opinions was obtained, reflecting each individual respondent`s perspective and the site-specific nature of some problems. However, the consensus is that corrosion and scaling remain major issues and that components requiring performance improvements include pipelines, well casing, turbines, heat exchangers, condensers, valves and cooling towers. It is recommended that appropriate research and development continue to be directed at reducing O and M costs associated with materials failure or inadequate service. There should be a balance between optimizing existing materials through better design and understanding of behavior in geothermal environments and development of new materials. Life extension of existing equipment, service life prediction, education of plant personnel in materials and methods for mitigating corrosion, and improvements in inhibitors and biocides would also be beneficial.

  7. SURVEY OF OPERATION AND MAINTENANCE-RELATED MATERIALS NEEDS IN GEOTHERMAL POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    ALLAN,M.L.

    1998-06-01

    A survey was conducted to determine operation and maintenance (O and M)-related materials needs in geothermal power plants and to identify future research and development to address these needs. A total of 44 questionnaires was mailed to geothermal plant operators and industry consultants. The response rate was 54%. The participants were asked to describe type and frequency of materials problems, strategies currently used to mitigate such problems, barriers to using new or alternative materials and technologies, sources of information and give their views research and development priorities. A. wide range of opinions was obtained, reflecting each individual respondent's perspective and the site-specific nature of some problems. However, the consensus is that corrosion and scaling remain major issues and that components requiring performance improvements include pipelines, well casing, turbines, heat exchangers, condensers, valves and cooling towers. It is recommended that appropriate research and development continue to be directed at reducing O and M costs associated with materials failure or inadequate service. There should be a balance between optimizing existing materials through better design and understanding of behavior in geothermal environments and development of new materials. Life extension of existing equipment, service life prediction, education of plant personnel in materials and methods for mitigating corrosion, and improvements in inhibitors and biocides would also be beneficial.

  8. Ageing of reinforced concrete pipes subjected to seawater in nuclear plants: optimization of maintenance operations; Vieillissement de tuyaux en beton arme soumis a l'eau de mer: optimisation des operations de maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Auge, L.; Capra, B.; Lasne, M. [OXAND S.A., 77 - Avon (France); Benefice, P.; Comby, R. [Electricite de France (EDF/DPN/GMAP), 93 - Saint-Denis (France)

    2007-07-01

    Seaside nuclear power plants have to face the ageing of nuclear reactor cooling piping systems. In order to minimize the duration of the production unit shutdown, maintenance operations have to be planned well in advance. In a context where owners of infrastructures tend to extend the life span of their goods while having to keep the safety level maximum, it is more and more important to develop high level expertise and know-how in management of infrastructures life cycle. A patented monitoring technique based on optic fiber sensors, has been designed. This preventive maintenance enables the owner to determine criteria for network replacement based on degradation impacts. A methodology to evaluate and optimize operation budgets, depending on predictions of future functional deterioration and available maintenance solutions, has been developed and applied. (authors)

  9. Maintenance and resupply in the unpressurized environment - Design and operational concepts for the Space Station Freedom logistics carriers

    Science.gov (United States)

    Creps, Gary M.; Ernst, Steven A.; Crawford, Robert D.

    1991-01-01

    A significant percentage of the maintenance tasks for Space Station Freedom are anticipated to be conducted in the unpressurized environment. The maintenance concept for this environment essentially involves the removal and replacement of relatively large orbital replacement units (ORUs). Major constraints will be the on-orbit availability of both crew time and spare ORUs. The challenge presented to the program will be the performance of unpressurized cargo resupply that provides maximum cargo-carrying capability (mass and volume) and flexibility (type and quantity), while minimizing the impact to maintenance task times. The design of the logistics carriers is a critical component for successful resupply and maintenance operations, and to the success of Space Station Freedom.

  10. Promotion of Sustainable Renovation in Europe

    DEFF Research Database (Denmark)

    Fokaides, Paris A.; Kanarachos, Andreas; Kanarachos, Georgette

    2013-01-01

    pressing the energy renovation of buildings. Both the obstacles and the contribution of national regulations will be discussed, towards promotion of sustainable renovation in Europe today. This study is also expected to report on research initiatives currently being undertaken in Europe on the energy...

  11. Collaboration Opportunities in Advanced Housing Renovation

    NARCIS (Netherlands)

    Mlecnik, E.; Kondratenko, I.; Cré, J.; Vrijders, J.; Degraeve, P.; Van der Have, J.A.; Haavik, T.; Aabrekk, S.A.; Gron, M.; Hansen, S.; Svendsen, S.; Stenlund, O.; Paiho, S.

    2012-01-01

    In theory, there is huge potential for reducing the energy consumed by existing single-family houses by thoroughly renovating them. For the successful market development of highly energy-efficient integrated renovations, supply chain collaboration is very important, while at the same time customer d

  12. Energy renovation services for single-family houses. Generalization and challenges of the one-stop-shop service model; Pientalojen energiaremonttipalvelut. Kokonaispalvelumallin yleistyminen ja sen haasteet

    Energy Technology Data Exchange (ETDEWEB)

    Paiho, S.; Kuusisto, J.; Stenlund, O.; Ala-Juusela, M.

    2012-08-15

    There are about 1.1 million single-family houses in Finland. 75% of these houses were built before year 1990. Majority of the houses remain at the energy- and eco-efficiency level of their construction time. If all of these houses were renovated to meet the state-of-the- art energy-efficiency requirements, the savings in nationwide consumption of heating energy would be 11.8 TWh. There are lots of typical single-family houses in the Finnish housing stock from the construction period. Renovation concepts with typical solutions can be developed for these typical houses. However, it must always be ensured that the selected concept suits the particular house. Comprehensive, full-service or one-stop-shop service models can be developed based on the renovation concepts. These may also include other services such as a building condition survey or a study, energy certificate, equipment and system installations, financial services, operation and maintenance services, and energy-monitoring and consumption analysis. It is natural to connect the one-stop-shop service model into the renovation process. The process includes stages for marketing, preliminary building inspection and energy audit, a detailed building inspection and energy analysis, a proposal for an integrated solution, the actual repair work, and quality assurance and continuous commissioning. Different stages involve different actors and service providers. There are several options for which type of organization or agent takes the main responsibility for the one-stop-shop service. Depending on the responsible organization, the content provider's business model and priorities differ. The one-stop-shop services business has been a narrow part of actors' whole business, so far. Some actors have already stopped providing the services, either due to the lack of demand or unprofitableness of the services. In an ideal model, the value promise and the main features of the model are the same, but the service

  13. BUILDING SUSTAINABLE ARCHITECTURAL DESIGN: A RENOVATION PROJECT

    Directory of Open Access Journals (Sweden)

    Hakan ÜNALAN,

    2011-12-01

    Full Text Available Today, the conservation of energy and respect for the natural environment appears to be the most important phenomena in all areas. In this regard, "sustainability" concept emerged and the architectural platform "Sustainable Architecture" is composed of a research subject to the new and permanent. Architecture underlying the "design" as including also the new concept of "sustainable architectural design" has revealed that field. Sustainable architecture "building in-house", "building envelope" and "physical environment" as shown in three different areas of development. Each consisting of three fields that directly affect andconcern. Sustainable architectural design within the scope of this study, "Building Envelope" developments will be discussed. In this context, building envelope, "the new building design" and "existingstructures" as appeared in two different ways. Existing structures, building envelope, sustainable architectural design in the literature in terms of "renovation" is considered within the scope. In terms of energy efficiency and performance (as Energy Performance of Buildings [BEP] with the energy policies of the various measures are being taken to reduce the energy consumption of the new building design. Not been received, but no measures in existing buildings (apartment buildings until 2012, except for heat insulation Remodeling obligation, energy consumption has remained constant. Therefore, the energy consumption of buildings on a sectoral basis is changing in the range 36-25% share of the portion of (Anonim 2011, but can not be reduced. In addition, operating costs of existing buildings and to reduce reliance on energy-environment systems (except for collectors used is noteworthy. In this study the appropriate design of sustainable architecture, renewable energy systems can be integrated into the shell structure will be investigated. In this context, a renovation project of the Department of Architecture at Anadolu

  14. ENERGY EFFICIENT RENOVATION OF SOCIAL HOUSING

    DEFF Research Database (Denmark)

    Blyt, Henrik; Christiansen, Michael; Bech-Nielsen, Grith

    2013-01-01

    . Secondly we present follow up methods for developing an overall future energy efficient renovation housing sector strategy. All in all, our project contributes to the building sector by testing new methods and suggesting methods for meeting challenges concerning energy efficient renovation. It also......This paper presents a case study which investigates a strategic and methodological approach to future proofed renovations of social housing in an environmental, economically and socially sustainable way. In years to come the social housing sector must undergo major renovation. The housing sector...... and socially sustainable objective, which seeks towards energy efficient renovation as an overall, systemic and interdisciplinary collaboration, the construction industry needs to focus on developing, testing, evaluating and implementing tools and methods to optimize and improve processes in a value...

  15. Restaurant No. 1 fully renovated

    CERN Multimedia

    2007-01-01

    The Restaurant No. 1 team. After several months of patience and goodwill on the part of our clients, we are delighted to announce that the major renovation work which began in September 2006 has now been completed. From 21 May 2007 we look forward to welcoming you to a completely renovated restaurant area designed with you in mind. The restaurant team wishes to thank all its clients for their patience and loyalty. Particular attention has been paid in the new design to creating a spacious serving area and providing a wider choice of dishes. The new restaurant area has been designed as an open-plan space to enable you to view all the dishes before making your selection and to move around freely from one food access point to another. It comprises user-friendly areas that fully comply with hygiene standards. From now on you will be able to pick and choose to your heart's content. We invite you to try out wok cooking or some other speciality. Or select a pizza or a plate of pasta with a choice of two sauces fr...

  16. 重整装置余热锅炉节能改造%Renovation of Waste Heat Boiler to Save Energy for Reforming Unit

    Institute of Scientific and Technical Information of China (English)

    于强

    2012-01-01

    为了回收重整加热炉系统烟气余热,多生产中压蒸汽,同时提高设备的运行的可靠性,消除安全隐患,对余热炉的烟筒、风机、炉管、保温材料等进行了改造和维修,改造后中压蒸汽产量有了较大幅度提高,同时增加了设备运行可靠性和运转周期,减少了安全隐患和维修费用。%To recover flue gas waste heat emitted from the reforming heaters, generate more medium-pressure steam and improve the reliability of equipment in its operation while eliminating potential safety hazard, renovation and maintenance were performed on such facilities as waste heat boiler stacks, blowers, furnace tubes and insulation materials. The renovation has not only raised the output of medium-pressure steam but improved the reliability and operational cycle of the equipment as well, reducing hence the potential safety hazard and maintenance cost.

  17. A Training Manual in Conducting a Workshop in the Design, Construction, Operation, Maintenance and Repair of Hydrams.

    Science.gov (United States)

    Peace Corps, Washington, DC. Office of Programming and Training Coordination.

    This manual presents a comprehensive training design, suggested procedures, and materials for conducting a workshop in the design, construction, operation, maintenance, and repair of hydrams, and in the planning and implementation of hydram projects. Hydrams (hydraulic rams, hydraulic ram pumps, automatic hydraulic ram pumps, rams) are devices…

  18. Legionellosis prevention in building water and HVAC systems a practical guide for design, operation and maintenance to minimize the risk

    CERN Document Server

    Joppolo, Cesare Maria; Pitera, Luca Alberto; Angermann, Jean Pierre; Izard, Mark

    2013-01-01

    This Guidebook is a practical guide for design, operation and maintenance to minimize the risk of legionellosis in building water and HVAC systmes. It is devided into several themes such as: Air conditioning of the air (by water – humidification), Production of hot water for washing (fundamentally but not only hot water for washing) and Evaporative cooling tower.

  19. Managing Asbestos in Place: A Building Owner's Guide to Operations and Maintenance Programs for Asbestos-Containing Materials.

    Science.gov (United States)

    Environmental Protection Agency, Washington, DC.

    Instructions for building owners on the selection and application of appropriate asbestos control and abatement actions are presented in this guidebook. Chapter 1 offers background information on the asbestos problem. Chapter 2 describes the purpose and scope of an operations and maintenance (O&M) program. The third chapter discusses planning…

  20. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true If I monitor brew ethanol, what are my... monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? (a... considered by us to be generally optimum. Use the brew-to-exhaust correlation equation established under §...

  1. Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.

    Energy Technology Data Exchange (ETDEWEB)

    Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

    2006-03-01

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

  2. Virus contamination from operation and maintenance events in small drinking water distribution systems.

    Science.gov (United States)

    Lambertini, Elisabetta; Spencer, Susan K; Kieke, Burney A; Loge, Frank J; Borchardt, Mark A

    2011-12-01

    We tested the association of common events in drinking water distribution systems with contamination of household tap water with human enteric viruses. Viruses were enumerated by qPCR in the tap water of 14 municipal systems that use non-disinfected groundwater. Ultraviolet disinfection was installed at all active wellheads to reduce virus contributions from groundwater to the distribution systems. As no residual disinfectant was added to the water, any increase in virus levels measured downstream at household taps would be indicative of distribution system intrusions. Utility operators reported events through written questionnaires. Virus outcome measures were related to distribution system events using binomial and gamma regression. Virus concentrations were elevated in the wells, reduced or eliminated by ultraviolet disinfection, and elevated again in distribution systems, showing that viruses were, indeed, directly entering the systems. Pipe installation was significantly associated with higher virus levels, whereas hydrant flushing was significantly associated with lower virus levels. Weak positive associations were observed for water tower maintenance, valve exercising, and cutting open a water main. Coliform bacteria detections from routine monitoring were not associated with viruses. Understanding when distribution systems are most vulnerable to virus contamination, and taking precautionary measures, will ensure delivery of safe drinking water.

  3. A regulator`s perspective on NRC`s participation in the operations & maintenance committees

    Energy Technology Data Exchange (ETDEWEB)

    Wessman, R.H.

    1996-12-01

    As a regulator fairly new to the American Society of Mechanical Engineers (ASME) Operations and Maintenance (O&M) Committee process, the author does not have a personal historical perspective as do many of the longer-term, and highly respected, members of the O&M Committee. However, as Branch Chief of the Mechanical Engineering Branch, Division of Engineering, in the Office of Nuclear Reactor Regulation at the NRC for just over two years, he has responsibility for the regulatory agency`s review of licensee actions involving the products that come from the efforts of the O&M Committee, as well as responsibility for portions of the activities of interest to other ASME Code groups such as Section III, Section XI, and Qualification of Mechanical Equipment. As a result, the author has learned a great deal about the code process in a short time. Here he gives his perspectives on the process and provides a few thoughts on the direction for the future.

  4. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  5. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  6. Plutonium uranium extraction (PUREX) end state basis for interim operation (BIO) for surveillance and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    DODD, E.N.

    1999-05-12

    This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following completion of the deactivation project. The deactivation project has removed or stabilized the hazardous materials within the facility structure and equipment to reduce the hazards posed by the facility during the surveillance and maintenance (S and M) period, and to reduce the costs associated with the S and M. This document serves as the authorization basis for the PUREX facility, excluding the storage tunnels, railroad cut, and associated tracks, for the deactivated end state condition during the S and M period. The storage tunnels, and associated systems and areas, are addressed in WHC-SD-HS-SAR-001, Rev. 1, PUREX Final Safety Analysis Report. During S and M, the mission of the facility is to maintain the conditions and equipment in a manner that ensures the safety of the workers, environment, and the public. The S and M phase will continue until the final decontamination and decommissioning (D and D) project and activities are begun. Based on the methodology of DOE-STD-1027-92, Hazards Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, the final facility hazards category is identified as hazards category This considers the remaining material inventories, form and distribution of the material, and the energies present to initiate events of concern. Given the current facility configuration, conditions, and authorized S and M activities, there are no operational events identified resulting in significant hazard to any of the target receptor groups (e.g., workers, public, environment). The only accident scenarios identified with consequences to the onsite co-located workers were based on external natural phenomena, specifically an earthquake. The dose consequences of these events are within the current risk evaluation guidelines and are consistent with the expectations for a hazards category 2

  7. Improving work load and comfort of operators on modified hydraulic excavators in rail road maintenance

    NARCIS (Netherlands)

    Grinten, M.P. van der; Houtman, I.I.D.

    2000-01-01

    In small-scale projects of mechanized maintenance of rail roads special equipped hydraulic excavators (HE) are used in several maintenance tasks. One task concerns the exchange of the old crossbars and ballast under the rails by new materials (MCE-task). This task requires high precision of the HE-o

  8. Study of the operation and maintenance costs of the Wavepower Limited Lancaster Flexible Bag system

    Energy Technology Data Exchange (ETDEWEB)

    Corrie, N.J.B.

    1981-11-01

    A maintenance strategy to support the credibility of the Lancaster Flexible Bag wave energy concept, covering scheduled maintenance (servicing and overhaul) and unscheduled maintenance (repair) has been developed and costed. Costs are presented on an annual basis for a turbo-alternator overhaul life of five years (for helicopter and hovercraft maintenance crew transit options) and for a turbo-alternator overhaul life of ten years (hovercraft transit option only). For the case where a turbo-alternator overhaul life of ten years is specified, annual scheduled maintenance costs, including replacements, are Pound 16.15M (0.092 p/kW-h installed); repair and contingency costs are Pound 8.64M (0.050 p/kW-h installed).

  9. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program; Satellite Facilities Operation and Maintenance, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2006-01-01

    prompting an early release. The total mortality for the acclimation period was 49 (0.05 %). The total number of fish released from the acclimation facility during the late period was 105,369. Maintenance and repair activities were conducted at the acclimation facilities in 2005. Facility maintenance work consisted of snow removal, installation of drainage lines, removal of gravel from intake area, installation of new gate at the CCAF, and complete overhaul of 2 travel trailers. The Catherine Creek Adult Capture Facility (CCACF) was put into operation on 11 February 2005. The first adult summer steelhead was captured on 4 March. A total of 190 adult summer steelhead were trapped and released from 4 March to 16 May 2005. Peak arrival at the trap was the week of 8 April. The first adult spring Chinook salmon was captured at CCACF on 6 May 2005. A total of 226 spring Chinook salmon were trapped from 6 May to 8 July 2005. There were 56 adults and 4 jacks unmarked and 136 adult and 30 jack marked spring Chinook salmon trapped. Peak arrival at the trap was the week of 10 June for the unmarked and marked fish. None of the captive broodstock returns were collected for broodstock. Broodstock was collected systematically over the entire return from 31 May to 6 July 2005. Ten of the 34 broodstock collected and transported from CCACF to LGH were unmarked fish trapped. About 18% of the naturally produced adult males and females trapped were taken to LGH for broodstock. One jack was collected for every 5 adult males that were taken to LGH. A total of 30 age 4 and 5 and 4 age 3 fish were transported to LGH for broodstock. The hatchery component of the broodstock was 66.7%. Five weekly spawning surveys were conducted below the weir on Catherine Creek beginning 30 June 2005. During these surveys no live or dead fish were observed. The trap was removed from Catherine Creek on 3 August 2005. Temperatures at the CCACF ranged from -0.1 C on 14 February to 23.7 C on 21 July. The hourly

  10. Maintenance problems associated with the operation of the F402 /Pegasus/ engine in the AV-8A /Harrier/ aircraft

    Science.gov (United States)

    Stanley, C. W.; Hood, W. E.

    1981-01-01

    The U.S. Marine Corp (USMC) has been operating the only V/STOL attack aircraft in the western world since 1971. Some of the maintenance problems experienced are related to the unique V/STOL design criteria of the Pegasus engine. However, the major part of the required maintenance effort is found to involve the more conventional engine problems. A description of the aircraft engine is provided and the problems resulting from V/STOL design demands are examined. Attention is given to the fuel system control, the engine air bleed, foreign object damage to the hp compressor, and the engine exhaust system.

  11. Operations and maintenance performance in oil and gas production assets. Theoretical architecture and capital value theory in perspective

    Energy Technology Data Exchange (ETDEWEB)

    Liyanage, Jayantha P.

    2003-07-01

    In response to growing demands from the Norwegian oil and gas industry, a joint industry project on the development and implementation of operations and maintenance performance indicators for the petroleum industry was initiated by the Center for Asset and Maintenance Management of Stavanger University College, Norway, in 1999. The project consortium composed of BP, Shell, Philips, Statoil, NorskHydro, Norwegian Petroleum Directorate, PricewaterhouseCoopers, Andersen Consulting, DNV, Industrial and Financial Systems (IFS), ADB Systems AS, DNV, RC Consultants and Tieto Enator. While the project was managed effectively to serve the expectations of member organizations, its boundaries were predefined by various conditions within organizational environments leaving a substantial space unexplored. Hence, the width and the breadth of operations and maintenance performance captured by the project were largely limited. This called for an independent research study to explore the phenomenon with a more broader or holistic perspective. Notably thus, while the project was devoted to a down-to-earth component of the exercise, i.e. to develop performance indicators, the exploratory research study was launched alongside to bring a theoretical or a philosophical insight. The study was conducted during 2000-2002 with collaboration of 14 organizations within the Norwegian continental shelf. The population included oil and gas producers regulatory and verification bodies and third parties. The study identified the bulk of problems that the entire problem domain constitute of within operations and maintenance performance. They were classified into some theoretical forms, and the study concentrated on, what I term, technical alienation, i.e. lack of descriptive performance models to guide meaningful assessment and management of operations and maintenance performance. The choice to shed some light in this endeavor was based on the relevance to SDV project, emerging managerial interest

  12. The Earthscope Plate Boundary Observatory Alaska Region an Overview of Network Operation, Maintenance and Improvement

    Science.gov (United States)

    Enders, M.; Boyce, E. S.; Bierma, R.; Walker, K.; Feaux, K.

    2011-12-01

    UNAVCO has now completed its third year of operation of the 138 continuous GPS stations, 12 tiltmeters and 31 communications relays that comprise the Alaska Region of the Earthscope Plate Boundary Observatory. Working in Alaska has been challenging due to the extreme environmental conditions encountered and logistics difficulties. Despite these challenges we have been able to complete each summer field season with network operation at 95% or better. Throughout the last three years we have analyzed both our successes and failures to improve the quality of our network and better serve the scientific community. Additionally, we continue to evaluate and deploy new technologies to improve station reliability and add to the data set available from our stations. 2011 was a busy year for the Alaska engineering team and some highlights from last year's maintenance season include the following. This spring we completed testing and deployment of the first Inmarsat BGAN satellite terminal for data telemetry at AC60 Shemya Island. Shemya Island is at the far western end of the Aleutian Islands and is one of the most remote and difficult to access stations in the PBO AK network. Until the installation of the BGAN, this station was offline with no data telemetry for almost one year. Since the installation of the BGAN in early April 2011 dataflow has been uninterrupted. This year we also completed the first deployments of Stardot NetCamSC webcams in the PBO Network. Currently, these are installed and operational at six GPS stations in Alaska, with plans to install several more next season in Alaska. Images from these cameras can be found at the station homepages linked to from the UNAVCO website. In addition to the hard work put in by PBO engineers this year, it is important that we recognize the contributions of our partners. In particular the Alaska Volcano Observatory, the Alaska Earthquake Information Center and others who have provided us with valuable engineering assistance

  13. 电动机的运行维护方法探讨%Discussion on motor operation maintenance method

    Institute of Scientific and Technical Information of China (English)

    马逢伯; 赵万龙; 徐齐

    2015-01-01

    The routine operation maintenance of electric system is the precondition for ensuring enterprise safety and stability,and the scientific maintenance and management is the fundamental guarantee for eliminating occurrence of electric equipment accident. Based on years of actual operation experience,this paper discussed maintenance operation procedure and operation inspection method of electric motor,and provided technical measures for electric operating personnel to use for reference.%电器系统的日常运行维护是保证企业安全平稳生产的前提条件,科学的维护和管理是杜绝电器设备事故发生的根本保证。文中结合多年的生产实际操作经验,探讨了电动机的维护作业程序与运行检查方法,为现场电器操作人员提供可以借鉴的技术措施。

  14. Renovation of historic, protected buildings in Geneva

    Energy Technology Data Exchange (ETDEWEB)

    Weber, W.; Haefeli, P.

    2009-07-01

    This report for the Swiss Federal Office of Energy (SFOE) reports on work done within the IEA Solar Heating and Cooling Program's Task 37. The objective of SHC Task 37 is to develop a solid knowledge base on how to renovate housings to a very high energy standard and how to develop strategies that support the market penetration of such renovation methods. The report deals with four listed buildings of historical value in Geneva, Switzerland, and examines various aspects of the renovation. These aspects include a discussion of the techniques applied, including internal and external insulation. Simulation methods used and results obtained are discussed. The improvements made are evaluated.

  15. Energy renovation solutions - catalogue; Energirenoveringstiltag - katalog

    Energy Technology Data Exchange (ETDEWEB)

    Tommerup, H.

    2010-07-15

    The project's aim has been to develop methods and examples of extensive energy renovations to stimulate energy conservation and increased use of renewable energy in existing buildings. The current report represents an extensive technology catalogue of typical energy renovation measures in connection with the renovation of existing buildings. For every action the main aspects are explained concerning such issues as technology, use, barriers, indoor climate, energy conservation and prices. The report is mainly targeted at construction industry, but also many other stakeholders can benefit from the report. (ln)

  16. How to Successfully Renovate a Controls System? - Lessons Learned from the Renovation of the CERN Injectors’ Controls Software

    CERN Document Server

    Kruk, G; Kulikova, O; Lezhebokov, V; Pace, M; Pera Mira, P; Roux, E; Wozniak, J Pawel

    2014-01-01

    Renovation of the control system of the CERN LHC injectors was initiated in 2007 in the scope of the Injector Controls Architecture (InCA) project. One of its main objectives was to homogenize the controls software across CERN accelerators and reuse as much as possible the existing modern sub-systems, such as the settings management used for the LHC. The project team created a platform that would permit coexistence and intercommunication between old and new components via a dedicated gateway, allowing a progressive replacement of the former. Dealing with a heterogeneous environment, with many diverse and interconnected modules, implemented using different technologies and programming languages, the team had to introduce all the modifications in the smoothest possible way, without causing machine downtime. After a brief description of the system architecture, the paper discusses the technical and non-technical sides of the renovation process such as validation and deployment methodology, operational applicatio...

  17. Goode Gym Energy Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Andrena [Bennett College, Greensboro, NC (United States)

    2014-12-11

    The Ida H. Goode Gymnasium was constructed in 1964 to serve as a focal point for academics, student recreation, and health and wellness activities. This 38,000 SF building contains a gymnasium with a stage, swimming pool, eight classrooms, a weight room, six offices and auxiliary spaces for the athletic programs. The gym is located on a 4-acre greenfield, which is slated for improvement and enhancement to future athletics program at Bennett College. The available funding for this project was used to weatherize the envelope of the gymnasium, installation of a new energy-efficient mechanical system, and a retrofit of the existing lighting systems in the building’s interior. The envelope weatherization was completed without disturbing the building’s historic preservation eligibility. The existing heating system was replaced with a new high efficiency condensing system. The new heating system also includes a new Building Automation System which provides additional monitoring. Proper usage of this system will provide additional energy savings. Most of the existing interior lighting fixtures and bulbs were replaced with new LED and high efficiency T-8 bulbs and fixtures. Occupancy sensors were installed in applicable areas. The Ida Goode Gymnasium should experience high electricity and natural gas savings as well as operational/maintenance efficiency increases. The aesthetics of the building was maintained and the overall safety was improved.

  18. Goode Gym Energy Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Andrena [Bennett College, Greensboro, NC (United States)

    2014-12-11

    The Ida H. Goode Gymnasium was constructed in 1964 to serve as a focal point for academics, student recreation, and health and wellness activities. This 38,000 SF building contains a gymnasium with a stage, swimming pool, eight classrooms, a weight room, six offices and auxiliary spaces for the athletic programs. The gym is located on a 4-acre greenfield, which is slated for improvement and enhancement to future athletics program at Bennett College. The available funding for this project was used to weatherize the envelope of the gymnasium, installation of a new energy-efficient mechanical system, and a retrofit of the existing lighting systems in the building’s interior. The envelope weatherization was completed without disturbing the building’s historic preservation eligibility. The existing heating system was replaced with a new high efficiency condensing system. The new heating system also includes a new Building Automation System which provides additional monitoring. Proper usage of this system will provide additional energy savings. Most of the existing interior lighting fixtures and bulbs were replaced with new LED and high efficiency T-8 bulbs and fixtures. Occupancy sensors were installed in applicable areas. The Ida Goode Gymnasium should experience high electricity and natural gas savings as well as operational/maintenance efficiency increases. The aesthetics of the building was maintained and the overall safety was improved.

  19. Effects of a motivating operation manipulation on the maintenance of mands.

    Science.gov (United States)

    O'Reilly, Mark; Aguilar, Jeannie; Fragale, Christina; Lang, Russell; Edrisinha, Chaturi; Sigafoos, Jeff; Lancioni, Giulio; Didden, Robert

    2012-01-01

    We assessed the maintenance of newly acquired mands under presession reinforcer access (reinforcer efficacy abolished) and no presession reinforcer access (reinforcer efficacy established) conditions with 3 children with autism spectrum disorder. Results suggested that the no presession access condition established the value of the reinforcer and evoked responding relative to the presession access condition. Results are discussed in the context of implications for assessing maintenance of previously acquired skills.

  20. Roadside infrastructure for safer European roads: D08 European best practice for roadside design: guidelines for maintenance and operations of roadside infrastructure. Project RISER, European Community

    NARCIS (Netherlands)

    Andersson, J.; Lanner, G.; Wink, W.; Halleman, B.; Naing, C.L.; Thomson, R.; Fagerlind, H.; Dupre, G.; Bisson, O.; Carcia, J.M.; Lopez, F.; Papi, J.; Martinez, A.V.; Amengual, A.; Valtonen, J.; Kelkka, M.; Goose, U.; Klootwijk, C.W.; Hoogvelt, B.; Horst, A.R.A. van der; Ridder, S. de; Hoschopf, H.; Hill, J.

    2006-01-01

    Maintenance and operations of road safety equipment and infrastructure ensure that all safety related elements of the road system are operating as they were designed, tested, and approved. Maintenance of road equipment should not only be considered as the repair of broken or damaged equipment, but a

  1. Analysis of the operation and maintenance of substation equipment operation and maintenance integration management and control%分析变电设备运检的运维及检修一体化管控

    Institute of Scientific and Technical Information of China (English)

    谢磊

    2016-01-01

    在当今形式下,我国的经济和科技水平在不断发展.因此,我国的城市化和工业化进程也得到极大推动.企业的用电量也在日益增加,本文主要就变电设备运检的运维及检修一体化管控展开研究和分析.%In today's form, China's economic and technological level in the continuous development of. Therefore,the process of urbanization and industrialization of our country has been greatly promoted. Enterprise's electricity consumption is also increasing,this paper mainly on the substation equipment operation and maintenance of the operation and maintenance of integrated management and control of research and analysis.

  2. Collaboration opportunities in advanced housing renovation

    DEFF Research Database (Denmark)

    Mlecnik, Erwin; Kondratenko, Irena; Cré, Johan

    2012-01-01

    identified key supply-side needs through interviews and questionnaires, and analysed important elements for the development of a web-based portal that can connect supply and demand. The project further developed ideas and methods for collaboration and business model generation between different players...... demand for integrated renovations has to be stimulated. A research and networking methodology was developed within the framework of the One Stop Shop project to identify and develop collaboration opportunities for advanced housing renovation in Belgium, Denmark, Finland and Norway. The research...... on the renovation market. These different research results contributed to defining new business opportunities related to process innovation to unburden the homeowner and to achieve less fragmented renovation processes...

  3. On the Testing of Renovations Inside Historical Opera Houses

    Science.gov (United States)

    Fausti, P.; Prodi, N.

    2002-11-01

    Due to the large number of historical opera houses in Italy, many theatres have been renovated in the past, but still more will undergo major restoration in the near future. Unfortunately in this context, the quality and protection of acoustics is rarely considered as an issue of its own. As a consequence, the renovations are hardly ever accompanied by proper scientific and technical support. In this paper, the acoustical impact of works inside the Teatro Municipale "R.Valli" in Reggio Emilia, including the restoration of the main hall and the construction of a new acoustic shell, will be dealt with. Surveys were held in the theatre before renovation and were repeated with identical procedure and instruments after its completion. By means of a comparative analysis of the architectural project and of acoustical data, the impact of major changes in the theatre can be predicted. It is shown that this approach can help in drafting an operational scheme for safeguarding the acoustics of historical opera houses.

  4. Health outcomes and green renovation of affordable housing.

    Science.gov (United States)

    Breysse, Jill; Jacobs, David E; Weber, William; Dixon, Sherry; Kawecki, Carol; Aceti, Susan; Lopez, Jorge

    2011-01-01

    This study sought to determine whether renovating low-income housing using "green" and healthy principles improved resident health and building performance. We investigated resident health and building performance outcomes at baseline and one year after the rehabilitation of low-income housing using Enterprise Green Communities green specifications, which improve ventilation; reduce moisture, mold, pests, and radon; and use sustainable building products and other healthy housing features. We assessed participant health via questionnaire, provided Healthy Homes training to all participants, and measured ventilation, carbon dioxide, and radon. Adults reported statistically significant improvements in overall health, asthma, and non-asthma respiratory problems. Adults also reported that their children's overall health improved, with significant improvements in non-asthma respiratory problems. Post-renovation building performance testing indicated that the building envelope was tightened and local exhaust fans performed well. New mechanical ventilation was installed (compared with no ventilation previously), with fresh air being supplied at 70% of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers standard. Radon was < 2 picocuries per liter of air following mitigation, and the annual average indoor carbon dioxide level was 982 parts per million. Energy use was reduced by 45% over the one-year post-renovation period. We found significant health improvements following low-income housing renovation that complied with green standards. All green building standards should include health requirements. Collaboration of housing, public health, and environmental health professionals through integrated design holds promise for improved health, quality of life, building operation, and energy conservation.

  5. Renovate Right: Prevent Lead Poisoning in Children

    Centers for Disease Control (CDC) Podcasts

    2008-10-02

    In this podcast, Dr. Maria Doa, Director of the Environmental Protection Agency's (EPA) National Program Chemicals Division, discusses EPA's new rule for renovations, repairs, and painting activities. The new rule includes information on lead-safe work practices when conducting renovations, repairs, and painting in pre-1978 homes and schools to prevent the spread of lead dust.  Created: 10/2/2008 by National Center for Environmental Health (NCEH).   Date Released: 10/2/2008.

  6. Unveiling the Process of Sustainable Renovation

    Directory of Open Access Journals (Sweden)

    Pär Meiling

    2012-06-01

    Full Text Available Renovation processes are complex and there is a risk of underestimating architectural, cultural, and social values in favor of exterior and interior upgrading, energy efficiency and financing. A synthesized, systematic process is needed for making decisions about renovation measures. The aim of this paper is to survey decision-making procedures aimed for sustainable renovation. We inventory existing tools and methodologies based on (a a literature review and (b results from a workshop with participants from the Swedish buildings sector, academia, and other stakeholders. Our results show that there are many tools available but few seem to have reached acceptance in renovation. None of the more established methods and tools addresses a complexity that balances material and immaterial values and they are often too specific. There is a need for simplified tools, especially for evaluating more intangible, experienced values. Instead of one comprehensive tool preferably a methodology for renovation should be developed with references to different tools. In the building sector, renovation should be considered a service-minded process rather than a merely technical one as often is the case in new construction. There is a need to clarify the process and the meaning of the terms, and that need is even more urgent when it comes to the values that are more difficult to define.

  7. Operation, Maintenance and Evaluation of the Bonifer and Minthorn Springs Juvenile Release and Adult Collection Facilities, 1988 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lofy, Peter T.

    1989-12-01

    The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife are cooperating in a joint effort to increase steelhead and re-establish salmon runs in the Umatilla River Basin. As part of this program, Bonifer and Minthorn Acclimation Facilities are operated for holding adult steelhead and acclimation and release of juvenile steelhead and salmon. This report details the projects and maintenance done during 1988.

  8. Using Genetic Algorithm For Winter Maintenance Operations: Multi Depot K-Chinese Postman Problem

    Directory of Open Access Journals (Sweden)

    İbrahim Zeki Akyurt

    2015-02-01

    Full Text Available In this study, the assignment and routing problem of one of Istanbul’s winter maintenance activities, salt pouring, was scrutinized. The starting point of the study considers the high cost of winter maintenance work, a shrinking assigned budget, high numbers of vehicles and streets to service that the increase in difficulty to solve the problem due to their high numbers. In this respect, the problem was modeled as multi depot k-Chinese postman problem, a type of arc routing problem. This mathematical model was solved by genetic algorithm. For comparison, the current solution, Clarke and Wright Algorithm and Sweep Algorithm were used.

  9. An Analysis of Aviation Maintenance Operations and Supporting Costs, and Cost Capturing Systems

    Science.gov (United States)

    2012-12-04

    duties as the assistant maintenance officer (AMO). LT Palomino was born in Bogota , Colombia, S.A., and grew up in Venezuela. After immigrating to...any new trends or tease out information that had not been discovered yet. Data from DECKPLATE, a system that NAVAIR maintains in Patuxent River

  10. 46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Science.gov (United States)

    2010-10-01

    ... diagram of lubrication points with the recommended lubricants; (v) A list of replaceable parts; (vi) A... program that includes the items listed in that paragraph. (3) If lifeboats, rescue boats or rigid... instructions, or as set out in the shipboard planned maintenance program. (2) Launching appliances must...

  11. Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2009-01-01

    in connection with condition-based maintenance. The approach can be used for gearboxes, generators, fatigue cracks, corrosion, etc. This paper also describes how probabilistic indicators can be used to quantify indirect information about the damage state for critical components, e.g. gearboxes....

  12. Effects of a Motivating Operation Manipulation on the Maintenance of Mands

    Science.gov (United States)

    O'Reilly, Mark; Aguilar, Jeannie; Fragale, Christina; Lang, Russell; Edrisinha, Chaturi; Sigafoos, Jeff; Lancioni, Giulio; Didden, Robert

    2012-01-01

    We assessed the maintenance of newly acquired mands under presession reinforcer access (reinforcer efficacy abolished) and no presession reinforcer access (reinforcer efficacy established) conditions with 3 children with autism spectrum disorder. Results suggested that the no presession access condition established the value of the reinforcer and…

  13. Value Analysis of Engine Maintenance Scheduling relative to Fuel Burn and Minimal Operating Costs

    NARCIS (Netherlands)

    Curran, R.; Van der Zwan, F.M.; Ouwehand, A.; Ghijs, S.S.A.

    2010-01-01

    The paper presents the results from a study in collaboration with an airline that looked at modeling the relationship of maintenance and fuel burn costs relative to minimizing the life cycle cost relative to schedule. The work has verified that the bucket theory presented in the paper is a correct a

  14. Working Memory Updating Latency Reflects the Cost of Switching between Maintenance and Updating Modes of Operation

    Science.gov (United States)

    Kessler, Yoav; Oberauer, Klaus

    2014-01-01

    Updating and maintenance of information are 2 conflicting demands on working memory (WM). We examined the time required to update WM (updating latency) as a function of the sequence of updated and not-updated items within a list. Participants held a list of items in WM and updated a variable subset of them in each trial. Four experiments that vary…

  15. Basic principles of knowledge management and its application to the industrial company in tactical operations of maintenance and operational exploitation: A qualitative study

    Directory of Open Access Journals (Sweden)

    Francisco Javier Cárcel Carrasco

    2013-01-01

    Full Text Available Purpose: Although knowledge and its management is, and has been, studied in depth, particularly since the 90’s decade of the past century, especially for the strategic management, innovation, trade, or business administration, there are still many questions on how it articulates or transfers and the barriers to its management, especially when we talk about internal tactical activities that affect staff that we could call "offices", such as maintenance and industrial assembly or exploitation and conduction of the facilities. Because of the peculiarities normally seen in this kind of activity in the industrial companies, the knowledge of these people is strongly based on their experience (strong tacit component, difficult to measure and articulate, and on many occasions, however, this rupture of information-knowledge, can represent a high cost for the company (often assumed to be something inevitable due to the increase in production and service downtime, loss of efficiency, or tuning time of new staff to these areas.Design/methodology/approach: After a description of the State of the art and the basic principles of knowledge management, a qualitative study in an industrial company has been carried out, within the areas of operation and maintenance, in order to know the barriers and facilitators that such involved personnel finds in order to achieve an adequate transmission and use of that knowledge.Findings and Originality/value: Learn about barriers, facilitators and impact that offers the knowledge management in the areas of industrial maintenance, especially among professionals in offices which operate with a high degree of tacit knowledge and with a heavy dependence on the company on these professionals.Research limitations/implications: Those characteristics of a qualitative study in a particular area and within a geographical area, although it can be extrapolated to other types of companies and regional areas.Practical implications: Learn

  16. VALIDATION OF SPRING OPERATED PRESSURE RELIEF VALVE TIME TO FAILURE AND THE IMPORTANCE OF STATISTICALLY SUPPORTED MAINTENANCE INTERVALS

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R; Stephen Harris, S

    2009-02-18

    The Savannah River Site operates a Relief Valve Repair Shop certified by the National Board of Pressure Vessel Inspectors to NB-23, The National Board Inspection Code. Local maintenance forces perform inspection, testing, and repair of approximately 1200 spring-operated relief valves (SORV) each year as the valves are cycled in from the field. The Site now has over 7000 certified test records in the Computerized Maintenance Management System (CMMS); a summary of that data is presented in this paper. In previous papers, several statistical techniques were used to investigate failure on demand and failure rates including a quantal response method for predicting the failure probability as a function of time in service. The non-conservative failure mode for SORV is commonly termed 'stuck shut'; industry defined as the valve opening at greater than or equal to 1.5 times the cold set pressure. Actual time to failure is typically not known, only that failure occurred some time since the last proof test (censored data). This paper attempts to validate the assumptions underlying the statistical lifetime prediction results using Monte Carlo simulation. It employs an aging model for lift pressure as a function of set pressure, valve manufacturer, and a time-related aging effect. This paper attempts to answer two questions: (1) what is the predicted failure rate over the chosen maintenance/ inspection interval; and do we understand aging sufficient enough to estimate risk when basing proof test intervals on proof test results?

  17. The Impact of Maintenance Free Operating Period Approach to Acquisition Approaches, System Sustainment, and Costs

    Science.gov (United States)

    2013-01-07

    OTA ru1d Dm’ing IOT and Updates based on actual energy consmnption. beyond Analysis of Fielded Program throughout tl1e maintenance, Sustaining Support...maintain strategic materiel readiness for 13,900 aircraft, 800 strategic missiles, 350,000 ground combat and tactical vehicles , 283 ships, and myriad...Menu driven login using HTTPS with Secure Socket Layer (SSL) encryption. • Used because system was deployed as autonomous , with no ship’s force

  18. Preventive maintenance is an enabler for operation excellence in support processes

    OpenAIRE

    Andersson, Roy; Manfredsson, Peter; Svensson, Victor

    2014-01-01

    TPM in a Lean office environment can create values both in a business and an employee dimension. In the employee dimension TPM reduces the risk of missing/forgetting areas of responsibility and creates more involvement. In the business dimension objectives such as cost, quality and supporting the reduction of waste improved. Preventive maintenance meetings can be included and performed once a month in the ordinary departmental “stand-up meetings”. Methods like 5S, which need to be updated on ...

  19. Analysis of Transmission Line Operation, Maintenance Techniques and Basic Ideas%简析输电线路运行、检修技术和基本思路

    Institute of Scientific and Technical Information of China (English)

    郑炳煌

    2014-01-01

    Driven by the rapid economic development, the state implemented a grid renovation project, transmission line maintenance work on a higher requirement. Inadequate maintenance of transmission lines combined with traditional modes exists for transmission lines running maintenance techniques were analyzed and discussed.%在经济快速发展的带动下,国家实施了电网改造工程,对输电线路的检修工作提出了更高的要求。结合传统输电线路检修模式中存在的不足,对输电线路运行检修技术进行了分析和探讨。

  20. Operator's Manual, Boiler Room Operations and Maintenance. Supplement A, Air Pollution Training Institute Self-Instructional Course SI-466.

    Science.gov (United States)

    Environmental Protection Agency, Research Triangle Park, NC. Air Pollution Training Inst.

    This Operator's Manual is a supplement to a self-instructional course prepared for the United States Environmental Protection Agency. This publication is the Boiler Room Handbook for operating and maintaining the boiler and the boiler room. As the student completes this handbook, he is putting together a manual for running his own boiler. The…

  1. Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011

    Energy Technology Data Exchange (ETDEWEB)

    Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

    2012-01-01

    DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

  2. Energy Efficient Renovation of Social Housing

    DEFF Research Database (Denmark)

    Bech-Nielsen, Grith; Christiansen, Michael

    2013-01-01

    In years to come the social housing sector (SH) must undergo renovation. The SH is out of step with modern requirements when it comes to plan arrangements, energy frame calcu-lation, flexible building services and social challenges. A way to solve such challenges in an environmentally, economically...... and socially beneficial way is energy renovation, which is overall, systemic and carried out as interdisciplinary collaborations. The project meets these challenges with two findings: First we present methods on how to carry out value generating interdisciplinary collabora-tion between the SH parties......, such as residents, housing administration, politicians, advi-sors, producers and contractors. Secondly we present follow up methods for developing an overall future energy renova-tion SH strategy. Our project contributes to the building sector by suggesting new methods for meeting challenges concerning energy...

  3. Analysis of promising sustainable renovation concepts

    DEFF Research Database (Denmark)

    Vanhoutteghem, Lies; Tommerup, Henrik M.; Svendsen, Svend

    the investment and running cost and savings during a defined relevant reference period, e.g. 30 years. Another method that could be used to illustrate the economic implications is “annual economic balance”, i.e. savings minus repayments on a mortgage credit loan, which may be relevant for homeowners who want...... method for proposals on package solutions for sustainable renovation was described. The method consists of four steps, going from investigation of the house to proposal for sustainable renovation, detailed planning and commissioning after renovation. It could be used by teams of consultants...... of 135 to 200 kWh/m2. Electric heating (and oil heating) of single-family houses is very common in the Nordic countries, except for Denmark where oil/gas boiler and district heating is mostly used. Natural ventilation is widespread in Denmark and there is tradition for mechanical ventilation in Norway...

  4. DST, decision support tool to facilitate energy-efficient renovation of buildings

    Energy Technology Data Exchange (ETDEWEB)

    Kondratenko, I.; Koene, F.G.H.; Kaan, H.F. [ECN Energy in the Built Environment, Petten (Netherlands)

    2008-04-15

    The aim of the DEMOHOUSE project is to develop minimum standards and recommendations for energy-efficient and sustainable renovation of social housing estates. Within this, the Decision Support Tool is one of the final results and uses knowledge gathered throughout the DEMOHOUSE project. In many European countries, social housing is owned by housing associations, municipalities or housing co-operations. To facilitate the decision makers in these organisations a simple instrument which helps to select relevant information for making decisions is developed within the DEMOHOUSE project. There are several phases in the process of renovation of dwellings. Main decisions in relation to ambitions of the renovation in energy-efficiency, sustainability, economic feasibility and occupants participation take place in the first so called initiative phase. It is this phase that the DST is focusing on to guide the decision makers, hosing managers and home owners associations alike, through decision making process towards achieving energy-efficient and sustainable renovation of dwellings. As any building renovation is a complex process with many stages, the tool also contains practical information and offers guidance and links to further more in-depth information of relevance to other stakeholders for example: architects, energy experts, building contractors, and building users.

  5. Interaction between operation and maintenance in the Itaipu Hydroelectric Power Plant, Brazil; Interacciones entre operacion y mantenimiento en la Central Hidroelectrica Itaipu

    Energy Technology Data Exchange (ETDEWEB)

    Vergara Baez, Carlos A. [Itaipu Binacional, Foz do Iguacu, PR (Brazil)]. E-mail: vergara@itaipu.gov.br

    1998-07-01

    This paper demonstrates the importance of the human resources good relationship, cooperation, understanding and training, for obtaining optimized results from the various interactions exiting among the operation and maintenance areas.

  6. Operation and Maintenance, 9-Foot Navigation Channel, Upper Mississippi River, Head of Navigation to Guttenberg, Iowa. Volume 2. Exhibits.

    Science.gov (United States)

    1974-08-01

    Falls 196 Impacts and Effects of Alternative Management Plans for 223 Operation and Maintenance of Nine-Foot Navigation Channel Pool 1 xii TABLE OF...DNUMBTPULEONRCR IPE TINICTE HWDRULI DUST PANY QREDGE HDSTRICA TABLA SUMMRY O THE"SLN LOATON VOLUMEC ANERQEC VOL DREDDEE ST00 PAUL OFNRAT DREDGIN INPON...C 4.C tt0 na a-at W"a- 4. t0 o I It E On N a co .tltt.C 084t-C .0 00 88 o. E~s. 3 ttt. ttttt tC~~ t 9 R T. PAULtttt DISRIC S XII 2 FODVLMS RBTR TEM N

  7. Live-Grid Operation and Maintenance of the 35 kV/121 MVA Superconducting Cable System

    Institute of Scientific and Technical Information of China (English)

    Huan-Huan Li; An-Lin Ren; Ying Xin; Hui Hong; Zhi-Li Chen; Lin-Na Shi

    2008-01-01

    A 33.5 m, 35 kV/121 MVA, three-phase, warm dielectric HTS power cable system was successfully installed and activated in China Southern Power Grid at the Puji substation in Kunming on April 19th of 2004, supplying electricity to four industrial customers (including two metallurgical refineries) and a residential population of about 100000. In this paper, we give an update on the operation and maintenance status of the system and comments on reliability issues. We conclude that the superconducting cable system is currently quite robust and feasible for particular utility applications, and it will be improved by advancement in cryogenic equipment and system technology.

  8. Energy Efficient Renovation of Social Housing

    DEFF Research Database (Denmark)

    Bech-Nielsen, Grith; Christiansen, Michael

    2013-01-01

    In years to come the social housing sector (SH) must undergo renovation. The SH is out of step with modern requirements when it comes to plan arrangements, energy frame calcu-lation, flexible building services and social challenges. A way to solve such challenges in an environmentally, economically......), (2) workshops and (3) seminars for qualifying (4) the definition of a common framework for (5) the development and (6) acceptance of the actual energy renovation strategy, which will then be transformed into action plans in the form of (7) ”common screening” of housing and housing areas as a basis...

  9. Utilizing field medical equipment to support fixed facilities during major renovation projects.

    Science.gov (United States)

    Call, C A; Maloney, J P

    1993-05-01

    When a fixed facility plans for renovation, the ultimate goal is to provide continuous, cost-effective medical operations. One alternative is to utilize field medical equipment. The Deployable Medical Systems (DEPMEDS), even though designed for battlefield medicine, has been successfully used for six fixed facility renovation projects. As a direct result of various studies, several improvements have been implemented and recommended for the DEPMEDS equipment when used to support fixed facilities. These projects have provided a rich learning experience and have significantly improved the readiness posture of the AMEDD.

  10. 基于LCC的运维检修资源预测方法研究%Study on LCC-based operation and maintenance resource prediction method

    Institute of Scientific and Technical Information of China (English)

    董芝春; 谢幸生; 林韶文; 吴毅江; 林悦德

    2016-01-01

    基于资产全生命周期理念,对变电设备的运维检修环节分解分析,根据设备运行的一般规律与运维检修的规程规定及实际工作,分别对差异化运维、预试定检、消缺、故障处理的活动需求建立相适应的预测方法,科学评估设备全生命周期运维检修活动需求,并结合运维检修劳动定额,构建运维检修资源预测模型.该模型的应用,科学评估了未来运维检修环节的资源需求,包括人员、机械、材料、金额等,实现运维检修资源配置的提前规划,优化资源配置,提升整体运维检修管理水平,保障电网安全可靠运行.%The operation and maintenance link of the substation equipments is decomposed and analyzed based on the theory of life cycle cost (LCC). According to the general rules of the equipments operation,and rules and regulations of operation and maintenance,and the practical work,the appropriate prediction methods are respectively established for the operation demands of differentiation operation and maintenance,periodic inspection and maintenance,fault elimination and fault handing to scientifi-cally estimate the operation demands of the equipments LCC operation and maintenance. The operation and maintenance re-source prediction model was established by combining the operation and maintenance production quota. The model can access the resource requirements including person,machine,materials and amount of the future operation and maintenance link,realize the plan ahead of the operation and maintenance resource allocation,optimize the resource allocation,promote the overall opera-tion and maintenance management level,and guarantee the safe and reliable running of the power grid.

  11. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position...

  12. A disaggregate model for quantifying the safety effects of winter road maintenance activities at an operational level.

    Science.gov (United States)

    Usman, Taimur; Fu, Liping; Miranda-Moreno, Luis F

    2012-09-01

    This research presents a disaggregated modeling approach for investigating the link between winter road collision occurrence, weather, road surface conditions, traffic exposure, temporal trends and site-specific effects. This approach is unique as it allows for quantification of the safety effects of different winter road maintenance activities at an operational level. Different collision frequency models are calibrated using hourly data collected from 31 different highway routes across Ontario, Canada. It is found that factors such as visibility, precipitation intensity, air temperature, wind speed, exposure, month of the winter season, and storm hour have statistically significant effects on winter road safety. Most importantly, road surface conditions are identified as one of the major contributing factors, representing the first contribution showing the empirical relationship between safety and road surface conditions at such a disaggregate level. The applicability of the modeling framework is demonstrated using several examples, such as quantification of the benefits of alternative maintenance operations and evaluation of the effects of different service standards using safety as a performance measure.

  13. Renovating Older Schools: Reusing Older Schools Workshop.

    Science.gov (United States)

    Mississippi State Univ., Mississippi State. Educational Design Inst.

    A slide presentation examines the decisionmaking process behind whether a community should renovate their older school facilities or abandon them for new facilities. Three factors to be considered in this decision are addressed and involve the school's location, the history of the school, and the relationship of the school to the community and the…

  14. Developing an integrated offer for sustainable renovations

    NARCIS (Netherlands)

    Cré, J.; Mlecnik, E.; Kondratenko, I.; Degraeve, P.; Van der Have, J.A.; Vrijders, J.; Van Dessel, J.; Haavik, T.; Aabrekk, S.; Paiho, S.; Stenlund, O.; Svendsen, S.; Vanhoutteghem, L.; Hansen, S.

    2012-01-01

    Within an ERANET-ERACOBUILD project, this study investigates the opportunities and barriers to establish a “one stop shop” with an integrated supply side, to counteract the fragmented offer in sustainable renovation of single-family houses and to increase the level of knowledge, skills and innovatio

  15. Renovating a Fusee Ceramique Barrel Vault

    NARCIS (Netherlands)

    Kamerling, M.W.

    2015-01-01

    This paper describes a proposal to renovate a Fusee Ceramique Barrel Vault with steel diagonals In 1956 two workshops, varying in height and span, were built in Wormerveer, The Netherlands. Both workshops were roofed with a concrete barrel vault with a thickness of 110 mm. The cylindrical vaults w

  16. 29 CFR 1918.96 - Maintenance and repair work in the vicinity of longshoring operations.

    Science.gov (United States)

    2010-07-01

    ... employees shall be guarded. (2) The power supply to machines shall be turned off, locked out, and tagged out... welding or cutting. (d) Abrasive blasting and spray painting. Longshoring operations shall not be...

  17. 40 CFR 63.7831 - What are the installation, operation, and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... operating limits in § 63.7790(b)(2) for pressure drop and scrubber water flow rate, you must install... a manner consistent with the guidance document, “Fabric Filter Bag Leak Detection Guidance,”...

  18. 40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ..., the pollutant concentration or parametric signal analyzer, and the data collection and reduction... must install, calibrate, and operate a flow indicator at the inlet or outlet of the control device to...

  19. DSOM - Decision Support for Operations and Maintenance - Application to a USMC Base Centralized Energy System.

    Energy Technology Data Exchange (ETDEWEB)

    Meador, Richard J.; Hatley, Darrel D.

    2004-06-01

    PNNL DSOM technology coordinates efficient steam plant operation with EMCS and SCADA systems, providing generation support and automated load shedding to meet peak demand limits saving over $1M in two years.

  20. Composite Environmental Statement for Operations and Maintenance of Four Projects in the Mermentau Basin, Louisiana.

    Science.gov (United States)

    1981-10-01

    as the arba and nassa. Various groups such as amphipods, nemerteans, ostracods, and mantis shrimp are also represented. Since the channel is dredged...Operation of the two water control structures has resulted in reduced habitat for shrimp , crabs, and other arine organisms, resulting in adverse impacts to...Structure has been operated since 1976 to permit ingress of juvenile shrimp and crabs when it was determined by the New Orleans District Office

  1. Applications of the renewable energies; Aplicaciones de las energias renovables

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Rocha, Luis Martin [Comision Nacional para el Ahorro de Energia, Mexico, D.F. (Mexico)

    2001-07-01

    The solar energy manifests itself in different forms and its application has been fundamental for the humankind development. These forms are known as renewable energies, since they are energy forms that are renewed or remade with time or that are so abundant on Earth, that they will last for hundreds or thousands of years, either we use them or not. The main advantage of the utilization of the renewable energies in comparison with hydrocarbons is the one of having smaller impact on the environment, which brings about the conservation of nonrenewable resources, and to postpone its exhaustion. They allow the distributed generation, diminishing the power losses in the transmission and distribution systems, which increases the overall efficiency. In addition they can be the drive for regional development and generation of employment, because when having applications in remote zones and being a field still not completely developed in Mexico, the possibility exists of enabling professionals and technicians. From the point of view of the power sector, the renewable energies extend the supply and availability of energy, making more flexible and independent the operation and reliability of the national power system. [Spanish] La energia solar se manifiesta de diversas formas y su aplicacion ha sido fundamental para el desarrollo de la humanidad. A estas formas se les conoce como energias renovables, ya que son formas de energia que se van renovando o rehaciendo con el tiempo o que son tan abundantes en la tierra, que perduraran por cientos o miles de anos, las usemos o no. La principal ventaja del aprovechamiento de las energias renovables en comparacion con los hidrocarburos es la de tener menor impacto al medio ambiente, lo que trae consigo la conservacion de recursos no renovables, y posponer su termino. Permiten la generacion distribuida, disminuyendo las perdidas energeticas en los sistemas de transmision y distribucion, lo que incrementa la eficiencia general. Ademas

  2. Operation And Maintenance In Facilities Management Practices: A Gap Analysis In Malaysia

    Directory of Open Access Journals (Sweden)

    Zawawi Zuraihana Ahmad

    2016-01-01

    Full Text Available Facilities management in Malaysia has started as early as 1990s during the development of mega projects such as Putrajaya in 1999 [8, 9]. During this period, Malaysia was introduced to an integrated property management and maintenance services known as facilities management. However, its implementation according to the standard practice is still being disputed. The purpose of facilities management standard practices is to provide the facility management profession with a leading reference on facilities management activities and standards. Therefore, the determination of how far the gap in FM current practice is essential to help our FM industry. Thus, the aim of this study is to establish the gap between the current practices and the standard practices and also how far the gap should be satisfied. A set of questionnaire was designed upon literature and previous research done to gather the required information. The study is subjected to FM organizations in private sectors and only the personnel at management level are assessed. There were certified that most of the practices that assessed by means of gap analysis had an acceptable result which the gap between the current practices and the standard practices are not too far.

  3. Industrial operations and maintenance demand-side management resource development: Literature and data review

    Energy Technology Data Exchange (ETDEWEB)

    Parker, S.A.; Gaustad, K.L.; Szydlowski, R.F.; Winiarski, D.W.

    1994-01-01

    Industry in the Pacific Northwest consumes a significant percentage of the total regional electric load; however, industrial demand-side management resource development activities in this sector are underdeveloped. One such opportunity for electricity resource development is through maintenance (O&M) activities. Despite the importance of industry in the Pacific Northwest, little information has been available on the DSM resource potential, particularly through O&M activities. To obtain this information, the Bonneville Power Administration commissioned Pacific Northwest Laboratory to study the DSM resource potential that may be achieved through O&M practices in Pacific Northwest industries. The information from this report will be used to identify one or more specific O&M activities or industries having significant opportunity for reducing electricity consumption for further evaluation in future tasks to this project. The overall goal of this project is to determine, confirm, and develop the conservation resources that can be achieved from O&M practices in Pacific Northwest industries. This project is developmental in nature because its scope involves a sizable task whose path and direction is difficult to define in advance. The primary focus of this report is to summarize the major findings of the literature and datareview. Detailed analysis and use of all data gathered in the review are beyond the scope this study. However, the reported findings in this analysis provide an extensive framework for identifying and estimating the electric resource potential available in the industrial manufacturing sector.

  4. 输电线路的运行与维护管理%Operation and maintenance management of transmission lines

    Institute of Scientific and Technical Information of China (English)

    徐英杰; 万强; 吴红石

    2016-01-01

    输电线路在运行过程中,有很多潜在的因素会对其安全性和稳定性造成巨大的威胁,在进行详细分析归类之后,应该采取具有针对性的措施,并由专门的监督和管理部门督促执行,这样,才能保证输电线路的安全稳定运行。输电线路的运行与维护管理对维护经济发展,提高居民生活水平等都有着十分重要的意义,因此,只有更好的执行输电线路的状态检测和状态检修工作,才能为输电线路的安全稳定提供保障。%During the operation of transmission line, there are many potential factors that can cause great threats to their security and stability, after carrying out a detailed analysis and classification, targeted measures should be implemented by management department, so as to ensure safe and stable operation of the transmission line. Operation and maintenance of transmission lines has a very important significance for maintaining economic growth and improving people's living standards. Therefore, only better execution of the detection and maintenance can provide protection for the security and stability of transmission line.

  5. Abrasive wear based predictive maintenance for systems operating in sandy conditions

    NARCIS (Netherlands)

    Woldman, M.; Tinga, T.; Heide, E. van der; Masen, M.A.

    2015-01-01

    Machines operating in sandy environments are damaged by the abrasive action of sand particles that enter the machine and become entrapped between components and contacting surfaces. In the case of the military services the combination of a sandy environment and the wide range of tasks to be fulfille

  6. Role of Educational Strategies for Human Resources in Green Infrastructure Operation and Maintenance

    Science.gov (United States)

    Ebrahimi, G.; Thurm, B.; Öberg, G.

    2014-12-01

    Rainwater harvesting and water reuse are receiving increasing attention as they hold the potential to effectively improve water conservation efforts. While many technical solutions have been developed, alternative water systems in built environments face significant challenges in the implementation and operational phases. The aim of this study is to examine obstacles to the implementation of alternative water systems in practice and identify criteria of feasible and sustainable solutions that allow bypassing of the identified obstacles. Interviews were conducted with planners, system designers and operators to find out which factors that central actors believe influence successful implementation of such systems. The results were analyzed in light of the literature. The actual performance of the water harvesting and reuse systems in four recently built green buildings in the Province of British Columbia, Canada was analyzed in light of the predicted outcome, according to the criteria identified in the interviews. It was found that the major obstacle to success is that the practical challenges involved in the implementation of alternative systems are underestimated. This, for example, leads to that education strategies for operational staff are not developed, and the staff is left floundering. This study highlights the importance of recognizing the need for strategic and directed educational programs for the human resources who are involved in operating and maintaining rainwater harvesting and water reuse systems.

  7. Construction, Maintenance, and Operation of a Glacial Runway, McMurdo Station, Antarctica

    Science.gov (United States)

    1998-03-01

    the glacial ice which would even- tually lead to the Pegasus runway. We regret that, because of his untimely death, he did not have the opportunity... lineal meter of Additionally, operators can remain in visual con- actual cutting edge (50 hp per lineal ft) to propel. tact with each other in case of a

  8. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ..., oxidation, and galvanic corrosion. (c) For each pressure CPMS that is used to monitor the pressure drop... where it is easily recognized by plant operating personnel. (6) For positive pressure fabric filter... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the...

  9. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Science.gov (United States)

    2010-07-01

    ... pushing emissions, you must install, operate, and maintain CPMS to measure and record the pressure drop... the pressure drop across each multicyclone during each push according to the requirements in... a manner consistent with the guidance document, “Fabric Filter Bag Leak Detection Guidance”...

  10. NORSOK within the offshore operation and maintenance sector; NORSOK innen offshore drift og vedlikeholdssektoren

    Energy Technology Data Exchange (ETDEWEB)

    Gram, Torleif

    1998-07-01

    The NORSOK initiative was taken in 1993 to improve the competitive position of the Norwegian Shelf. To mobilize as much engagement and support as possible for this work, top leaders from the oil companies, the industry and various authorities were gathered to form a development and operation forum for the petroleum sector that recommended the proposals made by the working groups. These leaders were supposed to provide for implementation in their own organizations. The NORSOK work is being continued jointly by OLF (Oljeindustriens Landsforening) and TBL (Teknologibedriftenes Landsforening). A liaison committee was appointed and it decided that the experience from NORSOK so far should be examined, with an emphasis on working processes between the oil companies and the industry. The committee decided to give preference to development rather than operation (Capex before Opex). The entire NORSOK has been very focused on Capex and the large cost overruns. The operation environment has been put into the shade. A sub committee under the liaison committee has been established that will rectify the situation. An important issue to be addressed by the sub committee will be the transfer of experience from the operation phase to the new projects. The composition and mandate of the subcommittee are described in detail.

  11. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must... evaluation procedure in § 63.7187(i) to demonstrate compliance, you must use the information from the...

  12. Operation and Maintenance of Wastewater Collection Systems: A Field Study Training Program.

    Science.gov (United States)

    California State Univ., Sacramento. Dept. of Civil Engineering.

    This manual was prepared by experienced wastewater collection system workers to provide a home study course to develop new qualified workers and expand the abilities of existing workers. The objective of this manual is to provide the knowledge and skills necessary for certification. Participants learn to effectively operate and maintain wastewater…

  13. An under-operation diagnostic apparatus for motor-operated valve. Technical trends on motor-operated valve conservation for nuclear power stations and condition based maintenance using the new diagnostic apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Itou, Haruo [Japan Atomic Power Co., Tokyo (Japan)

    2002-08-01

    A new motor-operated valve diagnostic analysis system (MOVDAS) can be, in short time, simply and with high precision, carried out diagnosis on deterioration and accident of motor-operated valves with many numbers used for separated and feeding valves important for safety of a nuclear reactor, not only at cease but also under operation of a power plant, and is technology capable of upgrading reliability on a motor-operated valve for a condition based maintenance tool and reducing conservation cost. MOVDAS is composed of a built-in torque sensor directly measurable transit torque behaviors with high precision by upgrading a torque sensing technology using strain gauges and a diagnostic apparatus to analyze their signals, which can be used even under operation of the valves. And, this technology can be adapted for under-operation integrity recognition of the valve recommended by NRC in U.S.A. and for operation and maintenance indication, JEAG-4803 in Japan. Here were introduced its contents and also a motor-operated valve remote diagnostic system recently developed in parallel. (G.K.)

  14. Efficient power plant operation due to communication standards. Application for inspection, service and maintenance; Effizienterer Kraftwerksbetrieb dank offener Kommunikationsstandards. Nutzen fuer Inspektion, Wartung und Instandhaltung

    Energy Technology Data Exchange (ETDEWEB)

    Brandt, Gerhard [ABB AG, Mannheim (Germany). Geschaeftsbereich Stromerzeugung

    2011-07-01

    Advanced device engineering and actual open communication standards in power plants offer comprehensive information, more than traditional engineering can present. By intelligent utilization of so gained different informations power plant process control systems can generate for the operator added value during operation, in special inspection, service and maintenance. (orig./GL)

  15. Lumen and Chromaticity Maintenance of LED PAR38 Lamps Operated in Steady-State Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Royer, Michael P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    The lumen depreciation and color shift of 38 different lamps (32 LED, 2 CFL, 1 ceramic metal halide [CMH], 3 halogen) were monitored in a specially developed automated long-term test apparatus (ALTA2) for nearly 14,000 hours. Five samples of each lamp model were tested, with measurements recorded on a weekly basis. The lamps were operated continuously at a target ambient temperature between 44°C and 45°C.

  16. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bluff, Stanley

    2000-12-01

    No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

  17. Operation and maintenance manual for the high resolution stereoscopic video camera system (HRSVS) system 6230

    Energy Technology Data Exchange (ETDEWEB)

    Pardini, A.F., Westinghouse Hanford

    1996-07-16

    The High Resolution Stereoscopic Video Cameral System (HRSVS),system 6230, is a stereoscopic camera system that will be used as an end effector on the LDUA to perform surveillance and inspection activities within Hanford waste tanks. It is attached to the LDUA by means of a Tool Interface Plate (TIP), which provides a feed through for all electrical and pneumatic utilities needed by the end effector to operate.

  18. The NUITM-KEMRI P3 Laboratory in Kenya: Establishment, Features, Operation and Maintenance.

    Science.gov (United States)

    Inoue, Shingo; Wandera, Ernest; Miringu, Gabriel; Bundi, Martin; Narita, Chika; Ashur, Salame; Kwallah, Allan; Galata, Amina; Abubakar, Mwajuma; Suka, Sora; Mohamed, Shah; Karama, Mohamed; Horio, Masahiro; Shimada, Masaaki; Ichinose, Yoshio

    2013-03-01

    A biocontainment facility is a core component in any research setting due to the services it renders towards comprehensive biosafety observance. The NUITM-KEMRI P3 facility was set up in 2007 and has been actively in use since 2010 by researchers from this and other institutions. A number of hazardous agents have been handled in the laboratory among them MDR-TB and yellow fever viruses. The laboratory has the general physical and operational features of a P3 laboratory in addition to a number of unique features, among them the water-air filtration system, the eco-mode operation feature and automation of the pressure system that make the facility more efficient. It is equipped with biosafety and emergency response equipments alongside common laboratory equipments, maintained regularly using daily, monthly and yearly routines. Security and safety is strictly observed within the facility, enhanced by restricted entry, strict documentation and use of safety symbols. Training is also engrained within the operation of the laboratory and is undertaken and evaluated annually. Though the laboratory is in the process of obtaining accreditation, it is fully certified courtesy of the manufactures' and constructed within specified standards.

  19. Fatigue evaluation in maintenance and assembly operations by digital human simulation

    CERN Document Server

    Ma, Liang; Bennis, Fouad; Zhang, Wei; Hu, Bo; Guillaume, François; 10.1007/s10055-010-0156-8

    2010-01-01

    Virtual human techniques have been used a lot in industrial design in order to consider human factors and ergonomics as early as possible. The physical status (the physical capacity of virtual human) has been mostly treated as invariable in the current available human simulation tools, while indeed the physical capacity varies along time in an operation and the change of the physical capacity depends on the history of the work as well. Virtual Human Status is proposed in this paper in order to assess the difficulty of manual handling operations, especially from the physical perspective. The decrease of the physical capacity before and after an operation is used as an index to indicate the work difficulty. The reduction of physical strength is simulated in a theoretical approach on the basis of a fatigue model in which fatigue resistances of different muscle groups were regressed from 24 existing maximum endurance time (MET) models. A framework based on digital human modeling technique is established to realiz...

  20. Modeling and Optimization for Dynamic Maintenance Strategy of Maintenance Repair and Operation System%MRO系统动态维修策略的建模与优化

    Institute of Scientific and Technical Information of China (English)

    石慧; 王玉华; 曾建潮

    2012-01-01

    在MRO系统中,随着对精益维修要求的日益提高,提出一种计算设备维护维修的最小平均费用率的模型.此模型是利用接收到的监控信息确定设备退化模型,设定退化模型动态预防性维修阈值,根据维修成本最小的原则动态选择最佳的预防性维护阈值和最佳的预防性维护时间.并计算各种不同参数下符合伽玛分布的退化模型的最小平均费用率,结论证明该模型的正确性和有效性.%In the MRO system, as the requirements of the lean maintenance is improved increasingly, a model of calculating the optimal preventive maintenance average cost rate is put forward. This model is used to determine the deterioration model using received monitoring equipment information, set the deterioration model preventive maintenance threshold value as time function, dynamically choose the best preventive maintenance threshold value and time according to the principle of minimal maintenance cost cycle. The least average cost rate of various parameters with gamma distribution under the deterioration model of optimal maintenance cycle is calculated. The conclusion shows that this model is correct and effective.

  1. Premium cost optimization of operational and maintenance of green building in Indonesia using life cycle assessment method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Budiman, Rachmat; Riswanto

    2017-06-01

    Building has a big impact on the environmental developments. There are three general motives in building, namely the economy, society, and environment. Total completed building construction in Indonesia increased by 116% during 2009 to 2011. It made the energy consumption increased by 11% within the last three years. In fact, 70% of energy consumption is used for electricity needs on commercial buildings which leads to an increase of greenhouse gas emissions by 25%. Green Building cycle costs is known as highly building upfront cost in Indonesia. The purpose of optimization in this research improves building performance with some of green concept alternatives. Research methodology is mixed method of qualitative and quantitative approaches through questionnaire surveys and case study. Assessing the successful of optimization functions in the existing green building is based on the operational and maintenance phase with the Life Cycle Assessment Method. Choosing optimization results were based on the largest efficiency of building life cycle and the most effective cost to refund.

  2. Prevalence and its risk factors for low back pain among operation and maintenance personnel in wind farms.

    Science.gov (United States)

    Jia, Ning; Li, Tao; Hu, Shuangqiu; Zhu, Xinhe; Sun, Kang; Yi, Long; Zhang, Qiong; Luo, Guilian; Li, Yuzhen; Zhang, Xueyan; Gu, Yongen; Wang, Zhongxu

    2016-07-26

    With the increasingly severe energy shortage and climate change problems, developing wind power has become a key energy development strategy and an inevitable choice to protect the ecological environment worldwide. The purpose of this study was to investigate the prevalence of low back pain (LBP) and analyze its risk factors among operation and maintenance personnel in wind farms (OMPWF). A cross-sectional survey of 151 OMPWF was performed, and a comprehensive questionnaire, which was modified and combined from Nordic Musculoskeletal Questionnaires (NMQ), Washington State Ergonomics Tool (WSET) and Syndrome Checklist-90(SCL-90) was used to assess the prevalence and risk factors of LBP among OMPWF. The prevalence of LBP was 88.74 % (134/151) among OMPWF. The multivariable model highlighted four related factors: backrest, somatization, squatting and lifting objects weighing more than 10 lb more than twice per minute. The prevalence of LBP among OMPWF appears to be high and highlights a major occupational health concern.

  3. Experience in operation and maintenance of systems of electrical generation by micro turbine: Transierra S.A.

    Energy Technology Data Exchange (ETDEWEB)

    Herrera, Franz Miranda [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    This work tries to share the experience of throughout six years, turned into experience of operation and maintenance of micro turbines for generation electrical; same those are used in the stations of measurement of Transierra S.A. In the initial stage it would describe to the ways and characteristic operative qualities for each one of the Micro Turbines in each scene that differs throughout the four stations that the GASYRG composes, taking like game the analysis of the thermal efficiency. Next a particular description of happened events would be realized in the six translated years in faults of general and particular way, centering the attention to the analysis of the resources provided by the controllers of the equipment through registry of events. Analyses that finally would be translated in solutions to short and medium term obtaining operative continuity and provision of electrical energy indispensable for the systems of measurement and control of the stations. Finally a description of all the particular solutions and modifications that went giving problems of design which they were not contemplated by the manufacturer emanated of the necessity and shaped with the aid of the same knowledge of the equipment. (author)

  4. An analysis of the impacts of economic incentive programs on commercial nuclear power plant operations and maintenance costs

    Energy Technology Data Exchange (ETDEWEB)

    Kavanaugh, D.C.; Monroe, W.H. [Pacific Northwest Lab., Richland, WA (United States); Wood, R.S. [Nuclear Regulatory Commission, Washington, DC (United States)

    1996-02-01

    Operations and Maintenance (O and M) expenditures by nuclear power plant owner/operators possess a very logical and vital link in considerations relating to plant safety and reliability. Since the determinants of O and M outlays are considerable and varied, the potential linkages to plant safety, both directly and indirectly, can likewise be substantial. One significant issue before the US Nuclear Regulatory Commission is the impact, if any, on O and M spending from state programs that attempt to improve plant operating performance, and how and to what extent these programs may affect plant safety and pose public health risks. The purpose of this study is to examine the role and degree of impacts from state promulgated economic incentive programs (EIPs) on plant O and M spending. A multivariate regression framework is specified, and the model is estimated on industry data over a five-year period, 1986--1990. Explanatory variables for the O and M spending model include plant characteristics, regulatory effects, financial strength factors, replacement power costs, and the performance incentive programs. EIPs are found to have statistically significant effects on plant O and M outlays, albeit small in relation to other factors. Moreover, the results indicate that the relatively financially weaker firms are more sensitive in their O and M spending to the presence of such programs. Formulations for linking spending behavior and EIPs with plant safety performance remains for future analysis.

  5. The impact of heat exchanger fouling on the optimum operation and maintenance of the Stirling engine

    Energy Technology Data Exchange (ETDEWEB)

    Kuosa, M.; Kaikko, J.; Koskelainen, L. [Lappeenranta University of Technology, Department of Energy and Environmental Technology, P.O. Box 20, FI-53851 Lappeenranta (Finland)

    2007-07-15

    This paper focuses on the effect of heat exchanger fouling on the performance of the Stirling engine in combined heat and power (CHP) application. Fouling results from using biomass fuels and affects the heat exchanger that transfers heat into the engine. This heat exchanger is referred to as the heater. The heat exchanger that recovers heat from the flue gases is also affected by fouling. To determine the performance of the Stirling engine, a commercial Stirling analysis tool is applied together with models that have been developed for the heat transfer in the heater, regenerator and cooler of the engine. The Stirling engine model uses constant temperatures for the heat addition and rejection, with the theory of displacement engine as a basis. The fouling in the heat exchanger is taken into account by using a fouling factor that corresponds with the degradation in the total heat transfer coefficient. The Stirling engine model together with the model for heat exchanger fouling makes it possible to estimate the effect of fouling on the performance of the Stirling engine. A cost model is developed for the engine to translate changes in performance into economy in CHP operation. In the studied application, the Stirling engine is operated by the heat demand. Together with the selected control method, performance and cost models compose a tool for the simulation and optimization of the system. The use of the models to determine the optimal cleaning interval of the heat exchanger surfaces is considered. (author)

  6. 输电线路运维作业方法研究%Optimizing Method Study of Transmission Line Operation and Maintenance

    Institute of Scientific and Technical Information of China (English)

    吴正佳; 祝小琴; 罗月胜; 林攀

    2012-01-01

    针对目前电力企业输电线路运维作业中存在的线路护线人员单薄、效率低、成本高的问题,比较了采用传统运维方式和重点区域划分法运维方式对输电线路运维的优越性,最后提出了一种新的运维方式,即采用重点区域划分结合1+1运维模式,组织群众护线的运维优化方法,达到减少运维作业时间,提高运维作业效率,降低运维成本的目的.并以某输电公司的线路实际运维模式为例,验证了此方法的合理有效性,并指出该方法对提高输电线路运维效率的重要意义.%According to the present problems of protecting line personnel tenuity, low efficiency, high cost existing in transmission line operation and maintenance in China's electric power enterprises, the traditional operation and maintenance model and key region division operation and maintenance model are compared. And then, a new method of 1 +1 operation mode based on key region division is proposed; so that maintenance time is reduced; the lines operation efficiency is improved; the maintenance cost is lowered. Taking a certain practical line operation of some area for example, the rationality and effectiveness of this model have been verified, so as to make significance on improving the line operation and maintenance efficiency.

  7. 运维管理系统在电力通信中的应用%Application of operation and maintenance management system in electric power communication

    Institute of Scientific and Technical Information of China (English)

    徐茹

    2012-01-01

    针对电力通信运维工作管理中存在的问题,对宁夏电力通信运维管理智能化的技术和功能实现进行了深入研究,开发建设了宁夏电力通信运维管理系统,以满足电力通信网发展对通信运维管理智能化、信息化的要求。应用结果表明:该系统作为提高通信网运维管理水平的重要工具,能够确保通信运维工作有序、高效开展,切实提升电力通信网运维工作的管理水平。%Aiming at the problems existing in operation and maintenance management works of elec- tric power communication, deeply studies the technology and function of intelligent realization for Ningxia electric power communication operation and maintenance management, developes and con- structs the Ningxia Electric Communication Operation and Maintenance Management System, to satis- fy the intellectualization and information demand of the electric power communication network devel- opment for operation and maintenance management. The application result shows that as the important tool of improving operation and maintenance management, the system can ensure communication oper- ation and maintenace works orderly development, practically improve operation and maintenance man- agement level of electric power communication network.

  8. Rebuilding instead of renovation?; Neubauen statt Sanieren?

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Seiler, B.; Kaufmann, Y. [Econcept AG, Zuerich (Switzerland); Binz, A.; Moosmann, A. [Fachhochschule beider Basel, Muttenz (Switzerland)

    2002-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of a study that examined the question of building renewal in Switzerland - should one rebuild or renovate? The report first examines the age-profile of Swiss buildings, defines renewal strategies and ideas, looks at renewal cycles and, in the light of future renewal demands, describes scenarios for replacement with new buildings instead of carrying out total renovations. The housing owners and their methods of management for multiple-apartment housing are described and the various factors involved in making decisions on how to renovate are discussed from the technical, legal and fiscal points of view. The report goes on to examine the ecological and energy aspects of renewal, presenting figures on energy consumption and material flows. Building renewal is also discussed from the social and regional planning points of view. The report is concluded with a discussion on rebuilding or renewal that takes current renewal deficits, costs and social aspects into account and makes recommendations for further action. An appendix presents renewal case studies.

  9. Discuss IT Operation and Maintenance Management of the Application and Practice%浅谈IT运维管理的应用与实践

    Institute of Scientific and Technical Information of China (English)

    王庆霞

    2012-01-01

    IT operation and maintenance management is nowadays IT bound of the hottest topics, With the deepening of IT construction and perfect, the enterprise in the IT environment also with different manufacturer's products and services in the quantity and the species increased, and become more and more complex, this paper mainly discusses the operation and maintenance of IT management understanding and operation and maintenance situation.%IT运维管理是时下IT界最热门的话题之一,随着IT建设的不断深入和完善,企业的IT环境也随着不同厂商的产品和服务在数量和种类上的增加,而变得越来越复杂。本文主要阐述了对IT运维管理的理解及运维情况。

  10. 浅析变压器油的运行与维护%Analysis of Operation and Maintenance of Transformer Oil

    Institute of Scientific and Technical Information of China (English)

    杨丽琼

    2012-01-01

    To maintain long-term normal operation of the transformer, it is necessary to carry out maintenance on the transformer and the maintenance and operation of the transformer oil is an important one. This paper carried out a detailed introduction on the operation and maintenance of transformer oil.%要保持变压器能够长期的正常运行,就必须对变压器进行必要的维护,而对变压器油的运行与维护是其中重要的一项.本文就对变压器油的运行与维护进行了详细的介绍.

  11. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of

  12. Keynote speech - Manned Space Flights: Lessons Learned from Space Craft Operation and Maintenance

    CERN Document Server

    CERN. Geneva

    2013-01-01

    Following graduation in 1973 from the Ecole de l'Air (the French Air Force Academy), Michel Tognini served in the French Air Force as an operational fighter pilot, flight leader in 1976, flight commander in 1979, test pilot then chief test pilot from 1983 to 1985. In 1985, France opened a recruitment program to expand its astronaut corps, and Michel Tognini was one of seven candidates selected by CNES. In July 1986, he was one of four candidates to undergo medical examinations in Moscow. In August 1986, he was assigned as a back-up crew member for the Soyuz TM-7 mission. Although he remained a French Air Force officer, he was placed on detachment to CNES for his space flight activities from September 1986 onwards. In 1991 he went to Star City, Russia, to start prime crew training for the third Soviet-French ANTARES mission. During his stay in Russia, he linked up with Mir (ANTARES mission) and spent 14 days (July 27–Aug. 10, 1992; Soyuz TM-14 and TM-14)carrying out a program of joint Soviet-French experimen...

  13. Hazards Forecasting and Weights Determination during Operation and Maintenance of Petrol Fuel Station

    Directory of Open Access Journals (Sweden)

    M.M. Ahmed

    2013-06-01

    Full Text Available Petrol Fuel Stations (PFS is the most commonly available hazardous facility within urban and rural areas. Hazardous materials such as petrol, diesel, Compressed Natural Gas (CNG and kerosene oil normally sell and stores at PFS. PFS can be considered as small refinery within the city. A 3.5 year study conducted and 3216 non-compliances were recorded from PFS located in various cities of Pakistan. The operating company was ISO 14001 and OHSAS 18001 certified. The recorded non-compliances during study period were categorized into 8 potential factors. These were Housekeeping (HK, Transportation Hazard (TH, Slips, Trips and Falls (STF, Carelessness (C, Fire Risks (FR, Electrical Fault (EF, Miscellaneous Cases (MC and Medical Treatment Cases (MTC. Analytical Hierarchy Process (AHP was used and categorized 8 factors were prioritized. The same data was further classified based upon to cause fatality, accident, incident and near miss cases. A total numbers of 14, 426, 975 and 1804, fatality, accident, incident and near miss cases were recorded. With application of Exponential Smoothing method the fatalities, accident, incident and near miss cases for the years 2011, 2012 and 2013 were forecasted. The results of AHP and forecasted hazards will be presented and discussed in this study. It is hope that the both approaches will assist health and safety professionals for future hazards predictions and hazards weights determinations. Health and safety practitioners can take remedial and preventative measures by using past data with utilization of proposed techniques.

  14. Renovation of the hotel complex

    OpenAIRE

    DRHA, Aleš

    2012-01-01

    The theme of this work is reconstruction the hotel complex. The theoretical part informs readers about tourism, marketing and how to build a business plan. Analytical part shows the issue of tourism in the region and technical condition of the hotel. In the synthetic part is suggested business plan to hotel reconstruction, marketing mix for tourism and financial plan, that shows operating costs and revenues. The investment could be paid off by the 13th year since the start of the hotel service.

  15. Research on operation and maintenance technology of intelligent power grid two times%智能电网二次设备运维技术的研究

    Institute of Scientific and Technical Information of China (English)

    刘伟

    2016-01-01

    通过对智能电网二次设备运维技术发展目标的分析,阐述了智能电网的二次设备的智能化运维原则,从而促进电力行业快速发展.%Through the analysis of the development goals of the two equipment operation and maintenance technology of smart grid,this paper expounds the principles of intelligent operation and maintenance of the two intelligent power grid,thus promoting the rapid development of the power industry.

  16. Capacity optimization of battery-generator hybrid power system: Toward minimizing maintenance cost in expeditionary basecamp/operational energy applications

    Science.gov (United States)

    Onwuanumkpe, Jude C.

    Low and transient load condition are known to have deleterious impact on the efficiency and health of diesel generators (DGs). Extensive operation under such loads reduces fuel consumption and energy conversion efficiency, and contribute to diesel engine degradation, damage, or catastrophic failure. Non-ideal loads are prevalent in expeditionary base camps that support contingency operations in austere environments or remote locations where grid electricity is either non-existent or inaccessible. The impact of such loads on DGs exacerbates already overburdened basecamp energy logistics requirements. There is a need, therefore, to eliminate or prevent the occurrence of non-ideal loads. Although advances in diesel engine technologies have improved their performance, DGs remain vulnerable to the consequences of non-ideal loads and inherent inefficiencies of combustion. The mechanisms through which DGs respond to and mitigate non-ideal loads are also mechanically stressful and energy-intensive. Thus, this research investigated the idea of using batteries to prevent DGs from encountering non-ideal loads, as a way to reduce basecamp energy logistics requirements. Using a simple semi-empirical approach, the study modeled and simulated a battery-DG hybrid system under various load conditions. The simulation allowed for synthesis of design space in which specified battery and generator capacity can achieve optimal savings in fuel consumption and maintenance cost. Results show that a right-sized battery-diesel generator system allows for more than 50% cost savings relative to a standalone generator.

  17. Design of a MGy radiation tolerant resolver-to-digital convertor IC for remotely operated maintenance in harsh environments

    Energy Technology Data Exchange (ETDEWEB)

    Leroux, Paul, E-mail: paul.leroux@kuleuven.be [KU Leuven, Dept. of Electrical Engineering (ESAT), AdvISe, Kleinhoefstraat 4, 2440 Geel (Belgium); Van Koeckhoven, Wesley; Verbeeck, Jens [KU Leuven, Dept. of Electrical Engineering (ESAT), AdvISe, Kleinhoefstraat 4, 2440 Geel (Belgium); Van Uffelen, Marco; Esqué, Salvador; Ranz, Roberto; Damiani, Carlo [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France)

    2014-10-15

    During future ITER maintenance operations, sensors and their embarked electronics will be exposed to a hostile and radioactive environment. This paper presents the design of a MGy radiation tolerant 16 bit resolver-to-digital converter (RDC) in 130 nm CMOS technology. The RDC features a Type II digital tracking loop, able to track resolvers with speeds up to 300 rps, and excitation frequencies up to 4 kHz. The RDC uses two integrated ΔΣ-analog-to-digital converters (ADCs) to digitize the resolver outputs. The 16 bit, 10 kHz ADCs utilize a correlated double sampling technique to remove radiation induced offset and 1/f-noise. The front-end features a static angular resolution of 16 bits (4.2 arcsec{sub rms}) and a resolution of 10 bits (6 arcmin{sub rms}) at a rotor speed of 100 rps. The circuit has a simulated radiation tolerance exceeding 1 MGy. It has the ability to operate under temperatures up to 125 °C, and to allow multiplexing with signals from other conventional sensors for compact, robust read-out architectures.

  18. Department of the Navy Justification of Estimates for Fiscal Year 1987 Submitted to Congress February 1986. Operation & Maintenance, Navy. Book 2. Budget Activity 7: Central Supply and Maintenance.

    Science.gov (United States)

    1986-02-01

    1,969 -288 *.*.. TOT,SHP LNCHD WPN RWK/MNT 7 T IMT ,0 In T7 = 700911 • .-. .... Activity Group: Ship Launched Weapons Rework and Maintenance (cont’d...34 Provides funds for the inspection, testing, repair, and alteration of Swimmer Delivery Vehicles (SDV) and Dry Deck Shelters (DDS), Underwater Breathing...projections. Support is provided for the Swimmer Area Navigation System (100), and handheld sonar (350). One additional Dry Deck Shelter will be

  19. 网络运维中现场作业任务调度的研究%A Research on Field Job Scheduling in Network Operation and Maintenance

    Institute of Scientific and Technical Information of China (English)

    许青林; 徐峰; 肖红; 刘沧生; 熊梦琪; 王志

    2016-01-01

    Due to the scheduling inefficiency in a large number of job requests for the network operation and maintenance of field operations and the jobs being unable to change adjustment issue, an on-site job scheduling algorithm based on improved genetic algorithm for network operation and maintenance is estab-lished. The algorithm is based on job-indirect encoding resources, combined with network operation and maintenance of on-site job resource scheduling features, by setting the upper limit of the number of jobs for each maintenance personnel to avoid excessive burden on maintenance staff, thus helping to improve the quality of service and resource utilization. The simulation results show that the use of genetic algo-rithms is effective in solving the network operation and maintenance resource scheduling.%针对网络运维现场作业调度中大量作业任务请求时效率低下、作业任务有所改变时无法自行调整等问题,提出基于改进遗传算法的网络运维中现场作业调度算法。该算法基于作业任务-资源的间接编码方式,结合网络运维中现场作业资源调度的特点,通过对每个维护人员设置作业任务数量的上限,避免某个维护人员负担任务数量过多,有利于提高服务质量以及资源的利用率。经过仿真实验,结果表明使用遗传算法可有效解决网络运维中资源调度问题。

  20. 76 FR 27044 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Science.gov (United States)

    2011-05-10

    ... on standard disks in Microsoft Word or ASCII file format. Instructions: Direct your comments to... transporting of waste. Final visual inspection and post renovation cleaning verification using...

  1. 75 FR 6383 - Lead-Based Paint Renovation, Repair and Painting, and Pre-Renovation Education Activities in...

    Science.gov (United States)

    2010-02-09

    ... accepted on standard disks in Microsoft Word or ASCII file format. D. How Should I Handle CBI Information... visual inspection and post renovation cleaning verification using prescribed protocol....

  2. [A preliminary evaluation of mental status and an investigation of occupational health knowledge demand in operating and maintenance personnel in wind power plants].

    Science.gov (United States)

    Hu, S Q; Zhang, Q; Zhu, X H; Sun, K; Chen, S Z; Liu, A G; Luo, G L; Huang, W

    2016-10-20

    Objective: To investigate the mental status, level of occupational health knowledge, health behaviors, and occupational health knowledge demand in operating and maintenance personnel in wind power plants, and to provide a basis for formulating protective measures of occupational health for operating and maintenance personnel in wind power plants. Methods: A cluster sampling was performed in regionally representative wind power plants in the wind power industry from May 2014 to June 2015, and the Symptom Checklist-90 (SCL-90) and a self-made evaluation questionnaire were used to investigate the general status, mental health, and occupational health knowledge demand in 160 operating and maintenance workers. Results: Of all respondents, 26.9% had mental health issues. The awareness rate of infectious disease knowledge and preventive measures was 11.9%. Of all workers, 96.5% wanted to know the occupational hazard factors in the workplace, and 96.3% wanted to get the knowledge of the prevention of related diseases. Conclusion: Mental health issues in operating and maintenance personnel in wind power plants cannot be neglected and there is a high demand for occupational health services and related knowledge. Comprehensive intervention measures for health promotion in the workplace should be adopted to improve working environment, enhance individual mental health education, increase the level of occupational health management, and protect the health of workers.

  3. Tractor-Maintenance: Operation & Daily Care [and] Servicing Air Cleaner & Lubrication. Student Materials. V. A. III. [V-C-1 through V-C-4].

    Science.gov (United States)

    Texas A and M Univ., College Station. Vocational Instructional Services.

    Designed for use by students in vocational agricultural classes, this manual deals with tractor maintenance. Operation and daily care are the topics of the first section. Safety is also covered. In the final part of the manual, servicing the air cleaner and lubricating the engine are discussed. Both sections conclude with a quiz. (PLB)

  4. 40 CFR Appendix B to Subpart E of... - Federal Guidelines-User Charges for Operation and Maintenance of Publicly Owned Treatment Works

    Science.gov (United States)

    2010-07-01

    ... all users per unit of time. Bc = O&M cost for treatment of a unit of biochemical oxygen demand (BOD... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Federal Guidelines-User Charges for... Subpart E of Part 35—Federal Guidelines—User Charges for Operation and Maintenance of Publicly...

  5. TEC MAX System. Operation and Maintenance Manual for the TEC Model 4005 MAX (Miniature Apparatus for X-Ray Diffraction System)

    Science.gov (United States)

    2005-03-31

    Model 4005) TEC has found that residual stress measurements can be made through thin layers of paint on steel surfaces (but not lead-based paints ...indicator lamp Operation and Maintenance Manual 5-11 TEC MAX System (Model 4005) 4005-OM-01 Revision 0, March 31, 2005 XRay Tube Status @ 0 20 40 60

  6. School Operations and Maintenance: Best Practices For Controlling Energy Costs. A Guidebook for K-12 School System Business Officers and Facilities Managers

    Science.gov (United States)

    US Department of Energy, 2004

    2004-01-01

    Operations and maintenance (O&M) offers not only strategies for maintaining facilities, but also opportunities for reducing energy costs and increasing energy efficiency at existing schools, regardless of age. This Guidebook provides detailed and practical guidance on how K-12 school districts can plan and implement enhancements to their current…

  7. ITIL在电信运维中的应用研究%Application research on ITIL in telecom operation and maintenance

    Institute of Scientific and Technical Information of China (English)

    陈炼

    2011-01-01

    This paper analyzed the application of ITIL theory in the operation and maintenance of telecom operators from three aspects, which were the current situation, the basic theory and application of ITIL. The paper also introduced the actual ITIL practice. It was suggested that telecom operators should focus on customer's needs, improve its operation and maintenance with continuous application of ITIL, and therefore improve their service quality.%从电信运营商的运维现状、ITIL基本理论、ITIL应用思路3个方面对引入ITIL理论在电信运维管理工作中的应用进行分析,结合实际,介绍ITIL的具体实践.建议电信运营企业应以客户为中心,不断应用ITIL完善自身运维管理,提高服务质量.

  8. Operation and Maintenance of Overhead Transmission Line%架空输电线路的运行维护

    Institute of Scientific and Technical Information of China (English)

    王刚

    2014-01-01

    架空输电线路是将不同地区的发电厂、变电站、负荷点连接起来,起输送或交换电能作用的线路。由于架空线路暴露在大气环境中,易受到雷电袭击、雨淋、湿雾以及自然和工业污秽等造成停电事故。因此,加强架空输电线路的运行维护具有重要的意义。%Overhead transmission line is connecting the power plant, transformer substation, load point in different regions, designed for conveyance or exchange of electric energy. Bec- ause the overhead line is exposed to the atmosphere, it is often caused blackouts due to lightning, rain, wet fog and natural and industrial polution. Therefore, it is of important significa- nce to strengthen the maintenance operation of overhead tran- smission lines.

  9. Proposal for the award of an industrial services contract for the operation and maintenance of liquid helium cryogenic plants

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for the operation and maintenance of liquid helium cryogenic plants. Following a market survey carried out among 54 firms in twelve Member States, a call for tenders (IT-2719/LHC) was sent on 18 August 2000 to two firms and four consortia, two consisting of two firms and two consisting of three firms, in five Member States. By the closing date, CERN had received tenders from one firm and three consortia, in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AIR LIQUIDE (FR) - LINDE KRYOTECHNIK (CH) - SERCO (DE), the lowest bidder, for an initial period of four years from 17 July 2001 for a total amount of 19 804 400 Swiss francs, not subject to revision until 16 July 2005. The contract will include options for two one-year extensions beyond the initial four-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudi...

  10. DOE Backup Power Working Group Best Practices Handbook for Maintenance and Operation of Engine Generators, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R.E.

    1998-10-30

    The lubricating oil system provides a means to introduce a lubricant in the form of a film to reduce friction and wear between surfaces that bear against each other as they move.1 The oil film which is established also cools the parts by carrying generated heat away from hot surfaces, cleans and carries dirt or metal wear particles to the filter media, and helps seal the piston to the cylinder during combustion. Most systems are pressure lubricated and distribute oil under pressure to bearings, gears, and power assemblies. Lubricating oil usually reaches main, connecting rod, and camshaft bearings through drilled passages in the cylinder block and crankshaft or through piping and common manifolds.Many parts rely on oil for cooling, so if the lube oil system fails to perform its function the engine will overheat. Metal to metal surfaces not separated by a thin film of oil rapidly build up frictional heat. As the metals reach their melting point, they tend to weld together in spots or streaks. Lube oil system failures can cause significant damage to an engine in a short period of time. Proper maintenance and operation of the lubricating oil system is essential if your engine is to accomplish its mission.

  11. Roof renovation of buildings 128 and 129

    CERN Multimedia

    2015-01-01

    The roof renovation of buildings 128 and 129 is scheduled to take place from 17 August to 15 October 2015.   During this period, access to the "raw material" workshop will be limited and controlled due to asbestos removal. Collecting your orders directly from the building will be difficult, or even impossible, and urgent requests will be difficult to carry out. We therefore ask you to create your requests via EDH, so that delivery may be carried out as soon as possible. Thank you for your understanding. GS Department

  12. Evaluation of Multi Residential House Renovation Efficiency

    Directory of Open Access Journals (Sweden)

    Daiva Rapcevičienė

    2011-03-01

    Full Text Available Analyzed multi residential house renovation investment projects efficiency evaluation methods: economic-social, and environmental, as well as key financial valuation methods: simple pay-back period, the energy cost savings, the net present value, internal rate of return. Building walls condition regenerative rate which is used to evaluate investments in energy-saving measures is also discussed. According to reconstruction investments of multi residential house, three government financing programs of multi residential house are evaluated and selected the most effective program by comparing financial valuation methods taking and without taking into account building walls condition regenerative rate. Article in Lithuanian

  13. Renovation of the CERN outdoor lighting

    CERN Multimedia

    GS Department

    2010-01-01

    Due to the renovation of the CERN outdoor lighting, traffic will be limited to one way along “Route Gregory” from the E entrance (France) up to “Route Fermi” just before the water tower between 12th and 23rd July 2010. Disruption can also be expected in the car parks “Les Erables” and “Les Tilleuls” close to building 30 and also the car park in front of building 377, between 19th and 30th July 2010. Thanks for your understanding. SEM Group

  14. LHC Magnet Test Benches Controls Renovation

    CERN Document Server

    Andreassen, O O; Page, S; Raimondo, A; Rijllart, A; Zorin, E

    2011-01-01

    The LHC magnet test benches controls were designed in 1996. They were based on VME data acquisition systems, Siemens PLCs control and interlocks systems. After a review of renovation of superconducting laboratories at CERN in 2009, it was decided to replace the VME systems with a PXI based systems and the obsolete Sun/Solaris workstations with Linux PC’s. This paper covers the requirements for the new system and shares the experience of the upgrade of the magnet test benches to these new platforms.

  15. Integrating of renewable energy in operation system: the Special Regime Control Centre (CECRE); Integracion de la energia renovable en la operacion del sistema: El Centro de Control de regimen especial (CECRE)

    Energy Technology Data Exchange (ETDEWEB)

    Division, M.

    2007-07-01

    The implementation of Red Electrica de Espana Special Regime Control Centre (CECRE) has demonstrated the Spanish System Operators commitment of integrating the maximum possible wind power generation into the electrical system compatible with secure operation. With this leadership initiative,for the first time in the world, a System Operator Control Centre (CECRE) has succeeded in sending power control instructions to wind power generators over the country through Generation Control Centres (CGC) to which these generators must be connected complying with the Spanish Rules. (Author)

  16. Dynamic pricing research of information system operation and maintenance services%信息系统运维服务的动态定价研究

    Institute of Scientific and Technical Information of China (English)

    徐颖; 葛世伦; 王念新

    2014-01-01

    信息系统运维服务的外包合同定价是现今运维服务业讨论的热点问题之一。文中以信息系统运维服务中的例行操作运维服务为对象,从信息系统运维服务供应商的角度出发,研究利润最大化情况下的信息系统运维服务的最优价格。首先,从信息系统运维服务供应商的角度,全面分析了信息系统运维服务的类型和特点,以及影响定价方法选择的因素,将企业分成4种类型;然后,利用两阶段动态定价模型和固定价格的定价方法,得到两阶段信息系统运维服务供应商利润最大化下的最优价格和4种类型的企业客户购买信息系统运维服务行为的临界点;最后,分析了企业的购买周期和信息系统复杂度对信息系统运维服务的价格和利润的影响。%The outsourcing contract pricing of information systems operation and maintenance services is one of the hot issues discussed in today′s operation and maintenance services area.Taking as the research subject rou-tine operation and maintenance services of information systems operation and maintenance,we study the informa-tion system operation and maintenance services best price in the case of profit maximization from the perspective of information system operation and maintenance services provider.First of all, from the information system ma-intenance services providers′point of view, we analyze the types and characteristics of information system mainte-nance services, and the factors that affecting the selection of pricing methods,enterprises being divided into four types.Secondly, we use two-stage dynamic pricing model and the pricing of fixed-price, getting the two stages in-formation system operation services suppliers′optimum price when profit is maximized and the behavior critical point of four types of enterprise customer purchasing information system operation and maintenance service.Last-ly, we analyze the impact of the

  17. Existing sustainable renovation concepts for single-family houses

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Vanhoutteghem, Lies; Svendsen, Svend

    2010-01-01

    with individual solutions, traditional warehouses ”do-it-yourself-shops” and some actors marketing single products. To speed up the implementation of sustainable renovation of single-family houses there is a great need for full-service packages. Existing technical renovation concepts, typically focusing......In the Nordic Innovation Centre Project, SuccessFamilies, the main objective is to change the business environment in order to speed up the implementation of sustainable renovation of single-family houses – proposing new service concepts that will combine both the technical solutions, financing...... services as well as other promoting issues to overcome the behavioural, organizational, legal and social barriers that exist in sustainable renovation. A starting point for such a change has been to get an overview of the existing sustainable renovation concepts, i.e. full-service concepts and technical...

  18. Energy Renovation of a Typical Danish Single-family House

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Svendsen, Svend

    2007-01-01

    the effect of the new requirements for renovation is that existing buildings should be brought up to the energy performance level of new buildings in connection with larger renovations and other substantial changes in the buildings. To demonstrate how it could be done, a thorough energy efficient renovation...... of a typical Danish single-family house from the 1960/70’s with need of renovation has been initiated and the preliminary results are presented in this paper. It is worth noting that about 500,000 of a total of 1.1 million Danish detached single-family houses were erected in that time period. Specifically......, the purpose of the project was to demonstrate that energy efficient renovation of a typical single-family house would lead to large reductions in energy consumption in a cost efficient manner, and at the same time improve living conditions. The focus has also been on achieving a commonly acceptable design...

  19. How to motivate homeowners to invest in sustainable renovation?

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    2014-01-01

    . In order to increase our chances of success, it is crucial to support and convince building owners to invest in sustainable renovation. In the case of homes, owners are willing to renovate for many other motives than impact on the environment, energy performance and cost savings. It seems therefore...... important to integrate, aside the societal needs, the individual values which might motivate these decision-makers to undertake such a sustainable renovation. A critical review of decision-aid methods and tools, which are susceptible to be integrated in a process of home renovation, is presented......In order to meet the energy use and greenhouse gas emission reduction goals, buildings are required to be built and renovated respecting stricter requirements. While increasingly more new buildings are constructed in a sustainable manner, most of the challenges are still to be overcome...

  20. 电力信息系统运维管理自动化解决方案%Electric Power Information System Operation and Maintenance Management Automation Solutions

    Institute of Scientific and Technical Information of China (English)

    温超

    2012-01-01

    As the implement of SG186 project of SGCC, the problems of electric power information system operation and maintenance management confusion, maintenance project lot and so on emerge. To solve the existing problems, it is necessary to electric power information system operation and maintenance related independent equipment and system integration as an organic information system maintenance automation platform,and simplify operation,enhance work efficiency.%随着国家电网公司SG186工程的实施,电力信息系统运维管理多头、运维项目多、运维人力成本呈倍数增长等问题随之出现。为更好的解决现存问题,有必要将电力信息系统中运维相关的独立设备和系统集成为一个有机的信息系统运维自动化平台,简化运维工作、提升工作效率。

  1. Security Strategy for Intelligent Substation Operation and Maintenance%智能变电站运行、检修安全策略研究

    Institute of Scientific and Technical Information of China (English)

    李宾皑; 曾平:

    2012-01-01

    分析了智能变电站的技术特点,结合现场运行实践和经验,讨论了智能变电站给传统运行、检修工作带来的影响和变化,并提出了变电站安全策略分析。%The technical characteristics of intelligent substation are analyzed. Then based on the field operation prac- tice and experience, the influences on conventional substation operation and maintenance exerted by intelligent sub- station are discussed, and substation security strategy analysis is suggested. Key words: intelligent substation ; substation operation; substation maintenance

  2. High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, L.E.; McGuire, D.R.

    1984-05-01

    This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly total than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.

  3. A Study to Compare the Cost of Operation and Maintenance in Green Building Index (GBI and Non-Green Building Index (Non-GBI Rated Building in Malaysia

    Directory of Open Access Journals (Sweden)

    Ping Lee Zheng

    2016-01-01

    Full Text Available Urges for sustainable development had pushed the government and professional bodies to respond and react by implementing regulations where possible to direct development in that manner. However, the outcome in most financial conferences and dialogues on sustainable buildings flagged on high construction and maintenance cost. Thus, this study is conducted to collect and analyze actual building operation and maintenance cost between GBI and Non-GBI rated buildings in Malaysia which are more than 2 years fully operated buildings. There are two categories of selected buildings which are residential and non-residential type of building. Each category of the building consists of similar building’s characteristic such as geographic location, mode of operation, building heights, total numbers of floors and units. The scope of building’s maintenance for this study is mainly on wear and tear of the wall painting, electrical light fittings, ceiling panels, roofing system and mechanical services like water pump system are recorded for their replacement frequency of service and the cost involved within a consistent period of 12 months operation at cost percentage saving of 78.9% and 40.4% for residential and non-residential buildings respectively compare against Non-GBI rated buildings. Electricity consumption for GBI rated buildings are lower than Non-GBI rated buildings which recorded at the cost variance of 23.8% and 6.3% and water consumption at 35.9% and 44.0% for the above mentioned two main categories of selected case study buildings. Results from this study conclude major savings on residential buildings category in term of maintenance cost and electricity consumption for GBI rated buildings. Whereby, non-residential category of buildings, GBI rated building had been proven to obtain significant savings in terms of maintenance cost and water consumption.

  4. Demand-based maintenance and operators support based on process models; Behovsstyrt underhaall och operatoersstoed baserat paa process modeller

    Energy Technology Data Exchange (ETDEWEB)

    Dahlquist, Erik; Widarsson, Bjoern; Tomas-Aparicio, Elena

    2012-02-15

    There is a strong demand for systems that can give early warnings on upcoming problems in process performance or sensor measurements. In this project we have developed and implemented such a system on-line. The goal with the system is to give warnings about both faults needing urgent actions, as well giving advice on roughly when service may be needed for specific functions. The use of process simulation models on-line can offer a significant tool for operators and process engineers to analyse the performance of the process and make the most correct and fastest decision when problems arise. In this project physical simulation models are used in combination with decision support tools. By using a physical model it is possible to compare the measured data to the data obtained from the simulation and give these deviations as input to a decision support tool with Bayesian Networks (BN) that will result in information about the probability for wrong measurement in the instruments, process problems and maintenance needs. The application has been implemented in a CFB boiler at Maelarenergi AB. After tuning the model the system has been used online during September - October 2010 and May - October 2011, showing that the system is working on-line with respect to running the simulation model but with batch runs with respect to the BN. Examples have been made for several variables where trends of the deviation between simulation results and measured data have been used as input to a BN, where the probability for different faults has been calculated. Combustion up in the separator/cyclones has been detected several times, problems with fuel feed on both sides of the boiler as well. A moisture sensor not functioning as it should and suspected malfunctioning temperature meters as well. Deeper investigations of the true cause of problems have been used as input to tune the BN

  5. Department of the Navy Justification of Estimates for Fiscal Year 1985 Submitted to Congress February 1984. Operation & Maintenance, Navy. Book 2. Budget Activity 7. Central Supply and Maintenance.

    Science.gov (United States)

    1984-02-01

    and technical deficiencies for the PHMs, a new class of high-speed missile-carrying hydrofoils . 2. Inputs/Outputs A. Surf. Cmbt...following schedule shows the funding plan by type of operation: Air Water Noise Solid Waste Pesticides Ecology Baseline Surveys ADp Support

  6. 特高压线路运行维护的问题分析%Problem Analysis of Uhv Line Operation Maintenance

    Institute of Scientific and Technical Information of China (English)

    任明凯

    2015-01-01

    对特高压输电线路运行维护特点进行分析,同时在此基础上对国内现阶段特高压线路的运行维护有关技术研究现状进行深入研究,制定相应的运行维护方案,有效提升国内电力系统特高压输电线路运行的可靠性与安全性,推动电力企业的进一步发展。%The paper analyzes the characteristics of uhv transmission line operation maintenance,at the same time,based on it,it deeply studies the operation of domestic uhv line current maintenance of the current related technology,and formu-lates corresponding operation maintenance plan,which effectively promotes the domestic power system the reliability and se-curity of the uhv transmission line operation and the further development of electric power enterprises.

  7. Development of a multicriteria tool for optimizing the renovation of buildings

    Energy Technology Data Exchange (ETDEWEB)

    Chantrelle, Fanny Pernodet [Scientific and Technical Centre for Building, Marne la Vallee (France); Lyon University, ENTPE, DGCB LASH, Vaulx en Velin (France); Lahmidi, Hicham; Keilholz, Werner [Scientific and Technical Centre for Building, Marne la Vallee (France); Mankibi, Mohamed El; Michel, Pierre [Lyon University, ENTPE, DGCB LASH, Vaulx en Velin (France)

    2011-04-15

    The renovation of a building involves not just the fulfilment of functional requirements, but also considerations such as energy consumption, investment costs, environmental impact and wellbeing. As things stand, new design methods and tools are needed, and the aim of the research presented in this article was to develop a multicriteria tool, MultiOpt, for the optimization of renovation operations, with an emphasis on building envelopes, heating and cooling loads and control strategies. MultiOpt is based on existing assessment software and methods: it uses a genetic algorithm (NSGA-II) coupled to TRNSYS, and economic and environmental databases. This article illustrates its utilization in the renovation of a school in the southern French city of Nice which was representative of France's building stock. The study started with the monocriterion optimization of energy consumption, cost, thermal comfort, and life-cycle environmental impact. It then moved onto multicriteria optimizations. The monocriterion analyses focussed on the building's characteristics and performance; the multicriteria analyses were concerned with the interactions between the different objectives, and with identifying their convergences and divergences. The results demonstrated that MultiOpt can be used to compare different combinations of options and constraints, thus constituting a basis for operational decision-making. (author)

  8. Repair, maintenance and improvement work in Finland; Korjausrakentaminen 2000-2010

    Energy Technology Data Exchange (ETDEWEB)

    Vainio, T.; Jaakkonen, L.; Nippala, E.; Lehtinen, E.; Isaksson, K. [VTT Building and Transport, Espoo (Finland)

    2002-07-01

    Repair, maintenance and improvement work in Finland - is basic research into how seriously the maintenance of the built environment is taken in Finland presently. The aim of the research has been to establish the value of today's renovation activity, its breakdown by building types, used renovation measures, and the reasons for renovations and the implementers. At the beginning of 2000, the combined floor area of the Finnish building stock was about 490 million square metres. Fifty-five percent of the total was housing stock: single-family houses, row houses, apartment blocks and free-time residential buildings. Households also owned 12 percent of the total building stock in the form of outbuildings and agricultural buildings. The remaining 33 percent consisted of industrial (15 %), commercial (12 %) and public buildings (8 %). In 2000, about euro 5,500 million was spent on renovating the building stock. The value of renovation has increased at a rate of 3-4 percent annually over the last ten years. Renovation's share of total building construction has been around 40 percent in recent years. The pace of renovation is going to decline slightly over the next ten years; annual growth will amount to 2.5-3.5 percent. Renovation on site, domestic production of building products used on site, and the many services related to the renovation process provided a total of 90,000 person-years of employment in 2000. Renovation decisions are often made by people who are not construction professionals whether a household in the case of a housing project or a property owner with regard to a non-residential project. Property managers have yet to realize the importance of preventive maintenance and repair. The tools (condition assessments and the maintenance manual) developed to assist building owners in long-term property management must be put to use. Renovation is a highly significant sector of construction and part of the national economy. It is important to allocate

  9. 可修部件运营维护模型分析%Analysis on operating maintenance model of repairable devices

    Institute of Scientific and Technical Information of China (English)

    苏宏升

    2011-01-01

    为改善多部件系统运营的管理水平和经济效益,基于可修部件检查率的动态控制策略,提出一种主动维护方案.基于独立性原理,分别建立了多部件系统在主动维护、被动维护和冗余备用维护管理下的数学模型,分析了可修部件在主动维护、被动维护和冗余管理模型下的可靠性及平均无故障工作时间(MTTF),以及部件在稳态运行时的期望维修费用和需求量.计算结果表明:基于主动维护的管理模型投资回收期最短,被动维护次之,冗余维护最差.在多部件系统运行维护管理中,基于检查率动态控制策略的主动维护方案是行之有效的手段.%In order to improve the management levels and economic benefits of multi-component system operation, a novel proactive maintenance scheme is proposed based on the dynamic control strategy of the check rate of the repairable components. Based on the dependability principle, the mathematical models are established under the conditions of the proactive maintenance, the passive maintenance, and the redundant maintenance, respectively. And then the reliability and mean time to failure (MTTF) are discussed under three kinds of models for repairable components, as well as the expected maintenance cost and quantity demanded. The computation results show that the investment recovery period is the shortest applying the proactive maintenance scheme, and the one of the passive maintenance scheme is the inferior, and the one of the redundant maintenance scheme is the worst. The research shows that the proactive maintenance scheme using the dynamic control strategy for the check rate is an effective management measure in the multi-component system.

  10. Acoustic Properties of a Renovated Building

    Directory of Open Access Journals (Sweden)

    Tomas Januševičius

    2011-02-01

    Full Text Available The article explores the effects of partitions, ceilings and facades on noise insulation in the renovated different buildings. The conducted experiments were aimed at analyzing partitions of 120 mm brick mounted gypsum panels while other walls were 520 mm thick and plastered on both sides. Under natural conditions, sound insulation factors of facades were measured and compared according to comfort classes. The obtained results revealed that thick brick walls of 520 mm insulated the sound of 58 decibels (dB (class B. In contrast, 120 mm brick masonry partition reduced sound only to 48 dB which is class E and agrees with the lowest class of sound insulation. We also calculated the sound insulation factor applying three formulas considering the mass law of sound insulation and comparing it with other previous studies. The paper examines and discusses the findings of the performed calculations and measurements.Article in Lithuanian

  11. Tips for cleanroom construction and renovation.

    Science.gov (United States)

    Mixon, William; Huffman, Lanny

    2009-01-01

    The installation or renovation of a cleanroom is an increasing priority among compounders who, to offer sterile preparations, must comply with the most recent version of United States Pharmacopeia revised General Chapter 797 guidelines. To upgrade their pharmacy facilites, many compounders have worked successfully with a large-scale mechanical engineering firm or a specialized construction company dedicated to cleanroom installation. However, a qualified local mechanical contractor with design capability is a valuable and often overlooked resource for the construction of customized stae-of-the-art cleanrooms. In this report, we describe the installation of such a facility in a busy pharmacy and suggest ways in which compounding pharmacists can identify competent local contractors and control the cost of construction and upgrades. The addition of a cleanroom has enabled The Compounding Pharmacy in Hickory, North Carolina, to achieve accreditation from the Pharmacy Compounding Accreditation Board.

  12. Acoustical components of the Orpheum Theatre renovation

    Science.gov (United States)

    Conant, David A.

    2002-05-01

    The before and after acoustically-important listening conditions and measurements are described for a $14.2 million restoration and renovation of this 1,400-seat grand 1929 Movie Palace-at one time the tallest building in Phoenix. Great care was taken to restore all the acoustically good parts of the original design and to subtly modify the acoustically-troublesome parts (including severely focusing dome and sidewalls) so they looked the same but performed properly. A beautiful playhouse was achieved in 1997 with fine, fixed acoustics and conventional audio reinforcement, a surrounding Italian village, plenty of gilt, moving clouds and sunsets overhead. Today, the venue successfully hosts shows from performance art to ballet to jazz. It was not intended (acoustically) to serve classical music but does so on occasion.

  13. Operating and maintenance technic analysis of air condition heat exchanger%飞机空调热交换器运行及维修工艺分析

    Institute of Scientific and Technical Information of China (English)

    闫慧; 章力; 王仲奇

    2016-01-01

    结合飞机空调热交换器的结构组成,介绍了空调热交换器的运行机理,从运行故障分析与维修工艺流程两方面,阐述了飞机空调热交换器的维修方法,有利于确保飞机空调系统的正常运行.%Combining with the structure composition of airplane air conditioning heat exchanger,this paper introduced the operation mechanism of air conditioning heat exchanger,from the running fault analysis and maintenance process two aspects,elaborated the maintenance method of air-plane air conditioning heat exchanger,helpful to ensure the normal operation of airplane air conditioning system.

  14. Treatment of liquid wastes generated by maintenance operations applied to motor vehicles; Tratamiento de residuos liquidos generados en las operaciones de mantenimiento de vehiculos a motor

    Energy Technology Data Exchange (ETDEWEB)

    Lloret i Bosca, G.; Boch Mossi, F.; Oyonarte Andres, S.; Colomer Signes, S.; Soro Casanova, J. R.

    2007-07-01

    The Life European project Urban-Bat presents an innovating approach to liquid wastes generated by maintenance operations applied to bus fleets by defining, through implementation of Best Available Technologies (Bat), a waste management model based on reduction of environmental impact and on life span increase of raw materials. This will take place at the very point of generation thus minimizing the need for an external waste management. (Author) 5 refs.

  15. Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

    2007-05-25

    This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

  16. Direct use of low temperature geothermal water by Aquafarms International, Inc. for freshwater aquaculture (prawns and associated species). An operations and maintenance manual

    Energy Technology Data Exchange (ETDEWEB)

    Broughton, R.; Price, M.; Price, V.; Grajcer, D.

    1984-04-01

    In connection with an ongoing commercial aquaculture project in the Coachella Valley, California; a twelve month prawn growout demonstration project was conducted. This project began in August, 1979 and involved the use of low temperature (85/sup 0/F) geothermal waters to raise freshwater prawns, Macrobrachium rosenbergii (deMan), in earthen ponds. The following publication is an operations and maintenance guide which may by useful for those interested in conducting similar enterprises.

  17. 基于ITIL税务信息化运维体系的探索%The Expolration of the Tax Information Operation and Maintenance System based on ITIL

    Institute of Scientific and Technical Information of China (English)

    余君亮

    2012-01-01

    Construction with the tax system information depth, the provincial tax departments are being implemented at the provincial level dataset run mode. Data at the provincial level to focus on the operation and maintenance of information technology also put forward higher requirements to establish a complete information technology operation and maintenance system has become increasingly important. In this paper, the actual situation of the tax information, analysis, development status and operation and maintenance work generally faced with the challenge of the tax system information on how to build a number of research and exploration based on ITIL tax information of the operation and maintenance system.%随着税务系统信息化建设的不断深入开展,各省税务部门都在陆续实施省级数据集中的运行模式。由于数据省级集中处理,对信息化运维工作也提出了更高的要求,建立完备的信息化运维体系,已经变得越来越重要。本文结合税收信息化工作的实际情况,通过对税务系统信息化发展现状及运维工作普遍面临的挑战进行分析,就如何构建基于ITIL的税务信息化运维体系进行了一些研究和探索。

  18. Logistic optimization of maintenance management of pipeline network using operational research resources; Otimizacao logistica do gerenciamento de manutencoes na malha de gasodutos em operacao utilizando os recursos de pesquisa operacional

    Energy Technology Data Exchange (ETDEWEB)

    Madeira, Italo M. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Andrade, Gustavo C. de [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    A Gas pipeline system is operated typically loaded every time and requires a continuous maintenance plan to prevent or correct faults that can compromise the shipping and the delivery of the product. In this meaning, this paper describes how to provide more integration between the elements from the pipeline management logistics to do the scheduling tasks of maintenance using operational research resources. This tool intends to discover with an optimal result, the best days for each maintenance intervention in pipeline doing an economically distributed maintenance plan. (author)

  19. 输电线路施工技术及运行管理维护探讨%Transmission Line Construction and Operation Management and Maintenance Techniques Discussed

    Institute of Scientific and Technical Information of China (English)

    黄财源

    2014-01-01

    The construction technology and operational management as a power grid construction and operation is an important part, its quality is directly related to the safe operation of the entire power grid could. Construction of the transmission line maintenance and operation management techniques are discussed, in order to promote the level of power grid construction and operation.%施工技术和运行管理作为电网建设、运营中的重要环节,其质量的好坏直接关系到整个电网能否安全运行。对输电线路施工技术和运行管理维护进行探讨,以促进电网建设和运营水平。

  20. Operation and maintenance experiences of DLN combustors for heavy duty gas turbines GE MS9001E (type DLN1) and FIAT 701D (type k point)

    Energy Technology Data Exchange (ETDEWEB)

    Arrighi, L.; Tirone, G.; Napoli, V.; Errico, R.; Ippolito, V.

    1998-07-01

    In ENEL at the moment (first half 1998) three 701D FIAT and six MS9001E GE/Nuovo Pignone gas turbines are in operation with DLN combustors; additional four 701D with DLN are in erection stage. The paper contains the operation and maintenance experience after some service years. The result of the combustion inspection of one 701D unit after four years of peak load operation and of two 701D units after two years of base load operation are included; the DLN combustors are ``K-point'' type. The paper contains also the results of the combustion inspection of two MS9001E units after three years of base load operation; the DLN combustors are type ``1''. Encountered problems and adopted repair actions are also included.

  1. Discussion on BIM operation and maintenance management technology%关于 BIM 运维管理技术的探讨

    Institute of Scientific and Technical Information of China (English)

    王小翔

    2016-01-01

    施工现场的运维管理缺少了一套能够贯穿设计、变更、施工模拟以及后期管控等一系列工作为一体的系统,而BIM运维管控技术很好地解决了这个问题。 BIM运维管理技术集成三维建筑模型、时间信息技术、结合算量、现场进度跟踪、云技术。本文对BIM的特点和BIM运维管控技术的价值进行分析,对其不足和发展空间进行探讨。%Maintenance and management of the construction site need a system that can combine a series of work such as the design , change, construction simulation , and the latter control as an entirety , and BIM operation and management control technology well solves the problem .BIM operation and maintenance management technology integrated three -dimensional building model , time information tech-nology, combined the amount of the field , the scene progress tracking , cloud technology .This paper analyzes the characteristics of BIM and the value of BIM operation and maintenance management and control technology , and discusses the problems and development of the technology .

  2. Maintenance and Condition-Based Maintenance

    Institute of Scientific and Technical Information of China (English)

    DING Jin-hua; WANG Xue-Jun; ZHOU Rong; LIN Min; Olsson Erland

    2005-01-01

    The evolution of maintenance management is briefly introduced in this paper, from corrective maintenance to preventive maintenance. First, a range of condition monitoring and fault diagnosis techniques developed in different industries are surveyed; Second, many methods of condition monitoring are presented; Third, mathematical methods used in condition monitoring are given; Then the merits and shortcomings are discussed.Efficient maintenance policies are of fundamental importance in system engineering because of their fallbacks into the safety and economics of plant operation. Applying condition-based maintenance to a system can reduce the cost and extend the availability of facilities. With the advent of personal computers as fast and cost effective machines for data acquisition and processing of multiple signals some shortcomings mentioned in condition monitoring could be solved or reduced to some extent. These PCs can be a solution as a condition monitoring based maintenance system.

  3. Research on maintenance and safe operation in CPI%化工生产装置检修作业与安全操作研究

    Institute of Scientific and Technical Information of China (English)

    孙秀峰

    2015-01-01

    分析了化工生产装备检修作业前后的应注意事项和具体操作的行为规范,从而确保了化工装置检修作业能够安全操作,对于检修后装置的安全稳定运行也非常重要.%This paper describes the matters needed to be attention before and after an overhaul in CPI along with rules of actual operation to ensure that safe maintenance and safe and stable operation of the plant afterwards.

  4. Discussion on the operational maintenance of DC ice- melting device%直流融冰装置的运行维护探讨

    Institute of Scientific and Technical Information of China (English)

    申国华

    2012-01-01

    结合500kV铜仁变电站固定式直流融冰装置的运行及融冰情况,简要介绍了直流融冰装置在日常运行维护和实际融冰工作中出现的一些情况进行探讨。%Combined with the operation and ice -mehing of fixed DC ice -mehing device for 500kV Tongren Substation, some status of DC ice - melting device during in the daily operational maintenance and the actual ice - melting work are discussed.

  5. Administracion regional de los recursos naturales renovables: corporaciones autonomas regionales

    National Research Council Canada - National Science Library

    Lacouture Danies, Hugues Manuel

    2006-01-01

    En Colombia, los Recursos Naturales Renovables son propiedad de la Nacion, y su administracion corresponde en el nivel regional a las Autoridades Ambientales mediante acciones y procedimientos que van...

  6. Summer residence hall renovations focus on student comfort, environmental sustainability

    OpenAIRE

    DeLauder, Rachel

    2009-01-01

    With the majority of students home for the summer, Virginia Tech Housing Services has undertaken a variety of improvements and renovations in its residence halls aimed at increasing comfort and safety for students, while decreasing overall environmental impact.

  7. Success and fail factors in sustainable real estate renovation projects

    NARCIS (Netherlands)

    Volker, L.

    2011-01-01

    Sustainability remains an important issue for the construction industry. Yet, sustainable real estate developments are still considered as highly ambitious projects. To find out how and why sustainable renovation projects actually became sustainable we systematically evaluated 21 leading Dutch real

  8. Business model development for customer-oriented housing renovation

    NARCIS (Netherlands)

    Mlecnik, E.; Kondratenko, I.; Haavik, T.

    2012-01-01

    Processes for ambitious energyefficient housing renovation are at present often too fragmented between many SMEs and clients have difficulties handling all information. This brings communication, planning, coordination and execution problems. It is also difficult for customers to find single respons

  9. Maintaining Indoor Environmental Quality (IEQ) during Construction and Renovation

    Science.gov (United States)

    ... renovation activities. Sources include drywall, plaster, concrete, soil, wood, masonry, flooring, roofing, and ductwork. Non toxic dusts are irritants and can exacerbate lung conditions such as asthma and chronic obstructive lung ...

  10. SOME PROBLEMS OF ENERGY SAVING IN THE COURSE OF RENOVATION OF BUILDINGS

    Directory of Open Access Journals (Sweden)

    Samarin Oleg Dmitrievich

    2012-10-01

    Full Text Available The implementation of energy saving actions in the course of renovation of residential houses is considered by the author in the article. The need to change the mode of operation of heat supply systems and the employment of steam-gas co-generation power plants as a source of heat is demonstrated. Therefore, the problem of power saving in the course of renovation of residential houses comprises several constituents, and its resolution involves the implementation of a number of interrelated organizational and process-related actions. This is the only way to avoid conflicts and to reduce power consumption and losses at each stage of power generation and transmission absent of any deterioration of the internal microclimate in renovated premises. The implementation of the aforementioned actions will make it possible to convert to the automatic energy consumption reduction mode through the implementation of engineering solutions and without any immediate involvement of legal entities. This methodology may arouse the interest of both producers and consumers of thermal and electric energy.

  11. Interactive planning of renovation works for residential buildings ИНТЕРАКТИВНОЕ ПЛАНИРОВАНИЕ РЕМОНТНЫХ РАБОТ ДЛЯ ЖИЛЫХ ЗДАНИЙ

    Directory of Open Access Journals (Sweden)

    Volkov Andrey Anatol’evich

    2013-04-01

    Full Text Available The paper deals with a new approach to renovation planning. The approach is based on the two models: one devaluation model and one renovation model.The proposed devaluation model is used to simulate the deterioration process taking place in a single component, a group of components or the whole building. The devaluation behavior is expressed through the employment of normalized values and the calendar time. Each component of the building has its own significance, so the normalized value of the whole building can be presented as a sum of normalized values of its components. The renovation model depends on the devaluation model as well as conditions and parameters applied by the user. For example, the user can attribute a certain value to a certain component and identify the level of renovation (the restored value.Thus, the two models consolidate into an integrated model. The input information is composed of the data about the physical state of the building, materials and mode of maintenance and operation. The output information represents renovation periodicity and renovation costs needed to maintain the building at the pre-set level.Приведено описание нового подхода для планирования ремонтных работ в интерактивном режиме. Данный подход включает моделирование процесса физического износа здания с целью формирования ремонтной модели для одного здания и комплекса зданий.

  12. Analysis and Comparison of Overheating Indices in Energy Renovated Houses

    DEFF Research Database (Denmark)

    Psomas, Theofanis Ch.; Heiselberg, Per Kvols; Duer, Karsten

    2015-01-01

    The scientific literature offers a number of methods for assessing the likelihood of overheating in buildings. The paper calculates eight well-documented indices for four representative family houses, from moderate and temperate climates, under different renovation processes (66 variants), with t......The scientific literature offers a number of methods for assessing the likelihood of overheating in buildings. The paper calculates eight well-documented indices for four representative family houses, from moderate and temperate climates, under different renovation processes (66 variants...

  13. AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned

    Science.gov (United States)

    2010-05-19

    Siting and Renovation Lessons Learned 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Daniel F . Schwartz (AFRL/RZSP) 5d. PROJECT... Daniel F . Schwartz a. REPORT Unclassified b. ABSTRACT Unclassified c. THIS PAGE Unclassified SAR 35 19b. TELEPHONE NUMBER (include...1 AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned Daniel F . Schwartz Air Force Research Laboratory

  14. Evaluation and optimization of secondary water supply system renovation

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Due to pollution in second water supply system (SWSS), nine renovation alternative plans were proposed and comprehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appropriate plan for engineering projects. In addition, a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study, the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system, an optimal scheme was obtained, the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the comprehensive analysis. The analysis revealed that the optimal scheme, compared with two other randomly calculated ones, increased the percentage of service population by 19.6% and 13.6% respectively, which significantly improved social and economical benefits.

  15. Network maintenance

    CERN Multimedia

    GS Department

    2009-01-01

    A site-wide network maintenance operation has been scheduled for Saturday 28 February. Most of the network devices of the general purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites throughout the day. This upgrade will not affect the Computer Centre itself, Building 613, the Technical Network and the LHC experiments, dedicated networks at the pits. For further details of this intervention, please contact Netops by phone 74927 or e-mail mailto:Netops@cern.ch. IT/CS Group

  16. Installation and operation maintenance of petrochemical pipelines%石油化工管道的安装与运行维护技术研究

    Institute of Scientific and Technical Information of China (English)

    徐国喜

    2015-01-01

    本文从石油管道阀门安装、石油管道的焊接、石油管道的管段安装与制作方面浅谈了石油化工管道安装技术,并从石油管道的防腐、管道的保养和巡视、管道的检测与泄露监测等方面,探讨了石油化工管道的运行维护技术.%The installation technologies of petrochemical pipelines are discussed in this paper in term of valve installation,pipeline welding,section installation and manufacturing. The operation and maintenance technologies are described in view of anticorrosion, maintenance and patrolling,detection and leakage monitoring on pipelines.

  17. 对矿用离心式水泵的操作和维护分析%Analysis of Operation and Maintenance of Mining Centrifugal Pumps

    Institute of Scientific and Technical Information of China (English)

    景忠玉

    2016-01-01

    在矿井建设和生产过程中,离心式水泵承担着排水的重要任务,正确使用以及维护离心式水泵对于矿井的安全生产起着决定性作用。主要分析了离心式水泵的工作原理和工作部件,提出了一系列操作和维护的有效措施。%In the process of mine construction and production ,centrifugal water pumps play an important role in drainage ,the correct use and maintenance of centrifugal water pumps are the decisive factor .This article mainly analyzed the working principle and working parts of centrifugal pumps ,then put forward a series of effective measures for the operation and maintenance of centrifugal pumps .

  18. 基于ITIL的医院信息系统运维管理实践%Practice of Operation and Maintenance Management of HIS Based on ITIL

    Institute of Scientific and Technical Information of China (English)

    田宗梅; 周毅; 张鹏

    2013-01-01

    目的 构建医院信息系统(HIS)安全运行环境,保障医疗工作有序进行.方法 我院计算机中心,依据ITIL(IT基础架构库)的服务管理标准和规范,根据医院的实际情况,按照PDCA循环(戴明环)的质量管理方法,对HIS运维管理流程进行持续改进.结果 提高了运维效率,防止了重大信息系统安全事件的发生.结论 在HIS运维中使用良好的管理方法,能够提高工作效率和医院整体信息系统应用水平,有效保障医疗工作有序进行.%Objective To construct the secure operation environment for HIS (Hospital Information System) so as to guarantee that the medical work can be done in good order. Methods In accordance with the practical situation of the hospital and quality management methods of PDCA(Plan, Do, Check, Action), continuous improvement of operation and maintenance management procedures in HIS are made in the computer center of Beijing Shijitan Hospital based on ITIL(Information Technology Infrastructure Library) service management standards. Results The efficiency of operation and maintenance management is improved, which prevents serious security incidents from occurring to the HIS. Conclusion With application of proper management methods in operation and maintenance management of HIS, work efficiency and utilization of HIS get highly enhanced so as to ensure the medical work is done in good order.

  19. Aircraft Ground Operation, Servicing, Fluid Lines and Fittings, Mechanics Privileges and Limitations, and Maintenance Publications, Forms and Records (Course Outline), Aviation Mechanics 1 (Power and Frame): 9073.02.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The course outline consists of five instructional blocks of several units each: (1) Aircraft Ground Operation and Servicing; (2) Fluid Lines and Fittings; (3) Mechanics Requirements, Privileges and Limitations; (4) Maintenance Publications; and, (5) Maintenance forms and Records. It is a basic course of knowledge and skills necessary to any…

  20. 三级克劳斯工艺的应用及改造%Use of 3-Stage Claus Process and Renovation Situation

    Institute of Scientific and Technical Information of China (English)

    吴义琴

    2015-01-01

    The sulfur recovery process flow and operation conditions of the unit of conventional 3-stage Claus process are introduced,and the renovation before and after trial production,and revamp situation during first time heavy maintenance are described.The operation for more than 2 years suggests that the sulfur recovery unit can satisfy the demand of continuous production,and theφ(H2 S +SO2 )in exhaust emission can generally meet the design requirement of ≤0.6%.%介绍了普通三级克劳斯硫黄回收工艺流程及装置运行情况,阐述了试生产前期改造、试生产后的改造以及第1次大修时的改造情况。通过2年多的运行,该硫回收装置可满足连续生产的要求,排出的尾气中φ(H2 S +SO2)基本能够达到≤0.6%的设计要求。

  1. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  2. A Model to Estimate the Operating and Maintenance (O&M) Costs of the Mine Resistant Ambush Protected (MRAP) Vehicles

    Science.gov (United States)

    2010-12-01

    September 28, 2010 from http://www.globalsecurity.org/military/systems/ground/mrap-var.htm Heizer , J., & Render, B. (2008). Operations Management ...Visibility & Management of Operation & Support Cost xv EXECUTIVE SUMMARY The role of High Mobility Multi-purpose Wheeled Vehicles (HMMWVs) in the United... Operating and Support Management Information System (OSMIS) and the Marine Corps’ Visibility and Management of Operating and Support Costs (VAMOSC

  3. The Role of Logistics in Practical Levelized Cost of Energy Reduction Implementation and Government Sponsored Cost Reduction Studies: Day and Night in Offshore Wind Operations and Maintenance Logistics

    DEFF Research Database (Denmark)

    Poulsen, Thomas; Hasager, Charlotte Bay; Jensen, Christian Munk

    2017-01-01

    This paper reveals that logistics make up at least 17% of annual operational expenditure costs for offshore wind farms. Annual operational expenditure is found to vary by a factor of 9.5, making its share of levelized cost of energy for offshore wind range from 13% to 57%. These are key findings...... contrast to the shore-based office personnel who develop studies directing cost reduction efforts. This paper details the company motivation to join industry-wide cost reduction initiatives. A business case for offshore wind operations and maintenance logistics yielding 1% savings in levelized cost...... of a 20-month research project targeting cost reduction initiatives for offshore wind systems. The findings reveal that cost-out measures are difficult to implement due to cultural differences. Implementation efforts are rendered by personnel located offshore in a harsh sea environment which is in stark...

  4. Transmission Line Construction Technology and Operational Management Maintenance Technology%输电线路施工技术和运行管理维护技术

    Institute of Scientific and Technical Information of China (English)

    王俊葳

    2015-01-01

    Transmission line construction project is an important part of power engineering, construction, and operation and maintenance of technical quality is directly related to the quality of the transmission line project, therefore, of great significance both for the security and stability of grid operation. Transmission Line Project construction techniques were analyzed and discussed the operational management and maintenance of the transmission line technology for the relevant officers.%输电线路施工工程是电力工程的重要组成部分,施工技术和运行维护质量直接关系到整个输电线路工程的质量,因此,二者对电网运行的安全和稳定具有十分重要的意义。对输电线路工程施工技术进行了分析,并探讨了输电线路运行管理维护技术,以供有关人员参考。

  5. Addendum No. 29 to the Memorandum of Understanding for Collaboration in the Construction, the Maintenance and Operation of the ALICE Detector Participation of National Institute of Science Education and Research, Bhubaneswar, India

    CERN Document Server

    Bertolucci, S

    2013-01-01

    Addendum No. 29 to the Memorandum of Understanding for Collaboration in the Construction, the Maintenance and Operation of the ALICE Detector Participation of National Institute of Science Education and Research, Bhubaneswar, India

  6. Operation and maintenance of 4106E melting index meter%德国ZWICK/ROELL4106E熔融指数仪的使用与维护

    Institute of Scientific and Technical Information of China (English)

    孙斌

    2011-01-01

    本文对德国ZWICK/ROELL公司生产的4106E熔融指数仪的测试要求进行了简单介绍,并针对该仪器在使用与维修中出现的技术问题进行了分析和探讨,提出了相应的解决措施.%The test requirement of 4106E melting index meter (ZWICK/REll company, Germany) is described briefly. The technical problems in the operation and maintenance of the instrument are analyzed emphati cally, and tbe methods for their solution are presented.

  7. Operation and maintenance engineering support of the Angra Unit 1 in Brasil; Presentacion de servicios de operacion y mantenimiento en la unidad 1 de la Central Nuclear de Angra (Brasil)

    Energy Technology Data Exchange (ETDEWEB)

    Castanos, E.

    2001-07-01

    Iberinco has developed during the last four years a major task in regards to the Operation and Maintenance of the Angra unit 1 plant in Brasil, by means of being awarded in the 1996 international licitation for the following activities. Operation and Maintenance engineering support - Material Procurement - Refuelling services In this article the most relevant activities performed during this period are shown as well as the organisation in charge to carry them out. (Author)

  8. Converter Compressor Building, SWMU 089, Hot Spot Areas 1, 2, and 5 Operations, Maintenance, and Monitoring Report, Kennedy Space Center, Florida

    Science.gov (United States)

    Wilson, Deborah M.

    2015-01-01

    This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from operation of the air sparging (AS) interim measure (IM) for Hot Spot (HS) Areas 1, 2, and 5 at the Converter Compressor Building (CCB) located at Kennedy Space Center (KSC), Florida. The objective of the IM at CCB HS Areas 1, 2, and 5 is to decrease concentrations of volatile organic compounds (VOCs) in groundwater in the treatment zones via AS to levels that will enable a transition to a monitored natural attenuation (MNA) phase. This OMMR presents system operations and maintenance (O&M) information and performance monitoring results since full-scale O&M began in June 2014 (2 months after initial system startup in April 2014), including quarterly performance monitoring events in July and October 2014 and January and May 2015. Based on the results to date, the AS system is operating as designed and is meeting the performance criteria and IM objective. The performance monitoring network is adequately constructed for assessment of IM performance at CCB HS Areas 1, 2, and 5. At the March 2014 KSC Remediation Team (KSCRT) Meeting, team consensus was reached for the design prepared for expansion of the system to treat the HS 4 area, and at the November 2014 KSCRT Meeting, team consensus was reached that HS 3 was adequately delineated horizontally and vertically and for selection of AS for the remedial approach for HS 3. At the July 2015 KSCRT meeting, team consensus was reached to continue IM operations in all zones until HSs 3 and 4 is operational, once HS 3 and 4 zones are operational discontinue operations in HS 1, 2, and 5 zones where concentrations are less than GCTLs to observe whether rebounding conditions occur. Team consensus was also reached to continue quarterly performance monitoring to determine whether operational zones achieve GCTLs and to continue annual IGWM of CCB-MW0012, CCBMW0013, and CCB-MW0056, located south of the treatment area. The

  9. Energy renovation practices in Danish homes. The influence of energy labels on home renovation practices

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, Toke Haunstrup; Gram-Hanssen, Kirsten [Danish Building Research Institute, Aalborg University, Dr. Neergaards Vej 15, DK-2970 Hoersholm (Denmark); Adjei, Afi [Building Research Establishment Ltd. BRE, Bucknalls Lane, Garston, WD25 9XX Watford (United Kingdom); De Best-Waldhober, Marjolein [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands)

    2012-02-15

    Heating of dwellings represents a major policy challenge for the transition to a low carbon society. In Denmark, heating of dwellings represents about 25% of the total Danish final energy consumption and about 13% of the total CO2 emission. The majority of this is related to heating of older dwellings, and as the rate of replacement is low, the main potential for energy saving is to improve the energy efficiency of the existing dwelling stock through energy renovation. This paper provides an analysis of Danish experiences with energy labels (also known as the Energy Performance Certificate, EPC), which indicate the energy efficiency of buildings and include recommendations for improvements. The aim of the EPC is to motivate homeowners to do energy improvements. In Denmark, energy audit schemes date back to the early 1980s and energy rating of houses (energy labelling) was introduced in 1997. The long history of energy audit schemes and energy labelling makes Denmark an interesting case for the study of the experiences with and impact of this kind of policy measure. With the EU Energy Performance of Buildings Directive (EPBD) from 2002, an energy labelling scheme similar to the Danish scheme introduced in 1997 is now in use in all EU member states. The focus of this paper is on the homeowners' experience and use of the EPC and the key research questions are: How do the homeowners understand and use the EPC? Does the EPC have an influence on home energy renovation practices? The analysis is based on results from a survey of Danish homeowners who have purchased a home with an EPC within recent years. The Danish survey is part of the European project IDEAL EPBD, which was funded by the European Commission under the Intelligent Energy Europe programme and run from 2008 to 2011. The results indicate a rather limited influence of the EPC on Danish homeowners' home energy renovation practices. Also, the results show that even though most homeowners find the label

  10. Diffusion dynamics of energy-efficient renovations causalities and policy recommendations

    CERN Document Server

    Müller, Matthias Otto

    2013-01-01

    Focusing on ways that energy-efficient building renovation can be accelerated, this book reviews current literature, offers policy recommendations and proposed regulations and sketches a business model supporting the diffusion of energy-efficient renovations.

  11. Monitoring and evaluation of Blyth Offshore Wind Farm. Projected operation and maintenance costs of UK offshore wind farms based on the experience at Blyth

    Energy Technology Data Exchange (ETDEWEB)

    Greig, E.

    2004-07-01

    This is the fifth of seven reports in this series on specific aspects of the monitoring and evaluation of the Blyth offshore wind farm project. The report assesses the operation and maintenance (O and M) costs for the wind farm in its first full year of operation, and extrapolates these costs to give indicative costs for larger projects. It identifies both planned regular costs and unplanned site maintenance costs; some costs can be attributed to 'troubleshooting' during installation and would not be expected in future years. The Blyth wind farm, the first in the UK, consists of two 2 MW wind turbines installed approximately 1 km from the coast in water about 6 m deep at low tide. The site is exposed to the full impact of the North Sea weather, breaking waves and a significant tidal range (about 5 m). Location, boat availability, weather and insurance are identified as the key factors affecting O and M costs for future offshore wind farms in the UK.

  12. Industrial Round-Wood Damage and Operational Efficiency Losses Associated with the Maintenance of a Single-Grip Harvester Head Model: A Case Study in Russia

    Directory of Open Access Journals (Sweden)

    Vladimir Syunev

    2012-09-01

    Full Text Available A field-based study was performed to broaden our knowledge of operational efficiency losses associated with the neglect of the proper maintenance of the delimbing and feeding mechanisms of a harvester. The post-harvest assessments of industrial round-wood (IRW processing damage, fuel consumption and productivity were examined in clearcutting operations. Observations were made of seven combinations of wear levels of feed rollers (A—heavy, B—medium, C and C’—without wear and sharpening states of delimbing knives (1—incorrect, 2—correct, depending on the degree of feed roller wear and matching of angles of knife blades to the technical requirements. The processing defects of IRW were broken down into unprocessed branches, bark stripping, and damage caused by feed roller spikes. The results were then compared with the effective quality requirements, and the IRW losses in terms of the reject rates (RR were determined in the context of the technical condition. The most frequent damage was by unprocessed branches. The harvester with correctly sharpened knives produced the minimum RR (4% of pine, 6% of spruce and 6% birch logs. The quality of IRW harvested under B1 and C1 resulted in 6%, 6% and 8%. A1 turned out to be the lowest (12%, 10% and 8%. Improvement in the maintenance of delimbing knives can reduce the RR of IRW by 5%. Timely restoration of worn-out rollers can increase productivity by 2% and reduce fuel consumption by 5%.

  13. Examining maintenance responsibilities.

    Science.gov (United States)

    Lam, K C

    2001-06-01

    This paper has examined the important responsibilities of the two organisations involved in the provision of maintenance service for the vital building services in many of our highly serviced buildings. The issues raised could be put to beneficial use in both clients and maintenance providers. All in all, the clients should work closely with their maintenance providers. Engineering services in buildings will not perform satisfactorily and efficiently if both parties do not work together and understand the maintenance tasks based on a business partnering mode. Put forward is the view that the management of the activities involved in the operation and maintenance process is a "shared commitment/involvement" between the client and the maintenance provider. It is obvious that many factors can influence the continued effectiveness of a quality maintenance scheme set up by client and provider. Some of these factors are: Change in key personnel Updates in technology Amendments to engineering practice Implementation of legislative requirements Changes in operation by client or provider Change of use of building Passage of time These factors must be fully reviewed by both parties from time to time, and necessary actions taken. A cooperative team working relationship and improved communication should be fostered by the client and his provider for the best management of services maintenance. This arrangement will contribute to better building services systems with continuous improvement; improved value for clients and higher return for the maintenance provider.

  14. Bethune-Cookman University STEM Research Lab. DOE Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Herbert W. [Bethune-Cookman University, Daytona Beach, FL (United States)

    2012-03-31

    DOE funding was used to renovate 4,500 square feet of aging laboratories and classrooms that support science, engineering, and mathematics disciplines (specifically environmental science, and computer engineering). The expansion of the labs was needed to support robotics and environmental science research, and to better accommodate a wide variety of teaching situations. The renovated space includes a robotics laboratory, two multi-use labs, safe spaces for the storage of instrumentation, modern ventilation equipment, and other “smart” learning venues. The renovated areas feature technologies that are environmentally friendly with reduced energy costs. A campus showcase, the laboratories are a reflection of the University’s commitment to the environment and research as a tool for teaching. As anticipated, the labs facilitate the exploration of emerging technologies that are compatible with local and regional economic plans.

  15. Prerequisites for Successful Strategic Partnerships for Sustainable Building Renovation

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Johansen, Jakob Berg; Thuesen, Christian

    The purpose of this paper is to identify the prerequisites for establishing successful strategic partnerships in relation to renovating buildings sustainably. Establishing strategic partnerships is in the paper seen as a potential way to make building renovation more sustainable in Denmark...... particularly in terms of reducing energy consumption and use of resources and increase productivity. However, until now we have only had a limited number of such partnerships implemented and the few examples that do exist, mostly concern the construction of new buildings. The paper is based on an investigation...... industry and analyses of two exemplary cases the paper suggests prerequisites for establishing successful strategic partnerships for sustainable building renovation. The results show that strategic partnerships are collaborations set up between two or more organizations that remain independent...

  16. Energy renovation of an old single-family house

    DEFF Research Database (Denmark)

    Overgaard, L.L.; Tommerup, Henrik M.; Svendsen, Svend

    2005-01-01

    cost of DKK 157,000. The project has shown that the energy renovation has reduced the gross energy consumption with around 50% from 53,400 to 28,100 kWh per year. This corresponds to a reduction of around 2,500 litre of fuel oil per year or 16,000 DKK per year (assuming a conservative energy price......After having identified a large potential for profitable energy renovation of the existing building stock, a demonstration project was carried out in practice. This paper deals with the methods and results from the demonstration project concerning a 161 m² poorly insulated single-family house built...... in 1927 in DK. Since the project has been carried out and the documentation thus established in only six months from September 2004 to January 2005, an extrapolation method for the measurement results has been used. Both before and after the energy renovation, detailed monitoring of the indoor environment...

  17. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.;

    2010-01-01

    The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  18. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Duarte, J. Caldeira; Garbatov, Y.; Zio, E.

    2010-01-01

    The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  19. 推进运维管理模式培养运维复合人才%Operation and Maintenance Management Model to Promote the Operation and Maintenance of Complex Human Culture

    Institute of Scientific and Technical Information of China (English)

    闫晓锋; 贾洋

    2014-01-01

    Combined with the current actual situation of operational work area, this paper analyzes the main problems in operations staff, and puts forward a new learning method, in order to improve their job skills.%结合运维工区当前的实际情况,分析运维人员在工作过程中主要存在的问题,并提出了新的学习方法,以提高运维人员适应新工作的能力。

  20. CALiPER Retail Lamps Study RRL3.2 Lumen and Chromaticity Maintenance of LED A lamps Operated in Steady-State Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Royer, Michael P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McCullough, Jeffrey J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tucker, Joseph C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    The lumen depreciation and color shift of 17 different A lamps (15 LED, 1 CFL, 1 halogen) was monitored in the automated long-term test apparatus (ALTA) for more than 7,500 hours. Ten samples of each lamp model were tested, with measurements recorded on a weekly basis. The lamps were operated continuously at an ambient temperature of 45°C (-1°C). Importantly, the steady-state test conditions were not optimized for inducing catastrophic failure for any of the lamp technologies—to which thermal cycling is a strong contributor— and are not typical of normal use patterns—which usually include off periods where the lamp cools down. Further, the test conditions differ from those used in standardized long-term test methods (i.e., IES LM-80, IES LM-84), so the results should not be directly compared. On the other hand, the test conditions are similar to those used by ENERGY STAR (when elevated temperature testing is called for). Likewise, the conditions and assumptions used by manufacturers to generated lifetime claims may vary; the CALiPER long-term data is informative, but cannot necessarily be used to discredit manufacturer claims. The test method used for this investigation should be interpreted as one more focused on the long-term effects of elevated temperature operation, at an ambient temperature that is not uncommon in luminaires. On average, the lumen maintenance of the LED lamps monitored in the ALTA was better than benchmark lamps, but there was considerable variation from lamp model to lamp model. While three lamp models had average lumen maintenance above 99% at the end of the study period, two products had average lumen maintenance below 65%, constituting a parametric failure. These two products, along with a third, also exhibited substantial color shift, another form of parametric failure. While none of the LED lamps exhibited catastrophic failure—and all of the benchmarks did—the early degradation of performance is concerning, especially with a

  1. 南京军区“医云工程”运维管理模式%Operation Maintenance Management Mode of Medical Cloud Project of Nanjing Military Region

    Institute of Scientific and Technical Information of China (English)

    薛以锋; 韩雄; 唐华; 马锡坤; 陈一君; 林亚忠

    2013-01-01

    Objective:To study the necessity and importance of operation maintenance management mode of Medical Cloud Project, and put forward the new pattern for operation maintenance management of digital hospital under the cloud computing conditions. Method: Business structure change and challenge after introduction of cloud computing by Medical Cloud Project are analyzed and implemented. Operation maintenance management requirements under the cloud computing conditions are studied. Solutions are provided. Results:According to the operation maintenance management requirements of cloud computing, the organization structure of operation maintenance management, various operation maintenance positions and responsibilities of cloud platform, operation maintenance boundary between them are defined. Combined with the corresponding operation maintenance rules and regulations and management process, it is restricted so as to realize an efficient and standard cloud platform operation maintenance management system. Conclusion:During the advancement of Medical Cloud Project, effect of cloud computing shall be given full play to, and operation maintenance management model of cloud computing shall be established.%  目的:探讨“医云工程”运维管理的必要性和重要性,提出云计算条件下的数字化医院运维管理新模式。方法:剖析实施“医云工程”引入云计算后的业务构架改变和挑战,研究云计算条件下的运维管理需求,提出解决办法。结果:按云计算的运维管理要求,理顺运维管理组织架构,落实云平台的各个运维岗位及职责,明确彼此间的运维边界,并结合相应的运维规章制度和管理流程加以约束,从而实现高效规范的云平台运维管理体系。结论:在推进“医云工程”的过程中,要充分发挥云计算效力,必须建立云计算的运维管理模式。

  2. Pond systems for the purification and disposal of domestic wastewater from small communities: use, design, operation and maintenance

    CSIR Research Space (South Africa)

    Drews, RJLC

    1983-01-01

    Full Text Available Pond systems are ideally suited for small communities, and for schools, hospitals and other institutions since they are simple and economical to construct, operate and maintain. Numerous pons systems have been designed and commissioned in South...

  3. Preventive maintenance and life time assessment with respect to cyclic operation; Foerebyggande underhaall och livslaengdsbedoemning med avseende paa cyklisk drift

    Energy Technology Data Exchange (ETDEWEB)

    Storesund, Jan

    2011-03-15

    Procedures that may be used for the life time assessments and growth laws for failure mechanisms with respect to cyclic operation has been compiled. Experience and analyzes of the effects of cyclical operation of steam drums, steam boxes, steam accumulators and valves has been compiled. For the strain-induced corrosion cracking in steam drums a correlation between the voltage level and the crack growth rate has been developed.

  4. Energy Renovation of Danish Single-Family Houses

    DEFF Research Database (Denmark)

    Mortensen, Andrea

    The PhD project is based on requirements from the European Union to reduce the energy consumption and on current renovation needs of and a huge energy saving potential in the Danish single-family houses from the 1960’s and 1970’s. The project focuses on the barriers for energy renovations...... of these houses and on defining motivation factors for the homeowners. The barriers are many and variating in influence and studies show that both professionals and homeowners are affected. The barriers range from lack of interest and knowledge to uncertainties about among others economy and technical solutions...

  5. How to motivate homeowners to invest in sustainable renovation?

    DEFF Research Database (Denmark)

    Galiotto, Nicolas; Heiselberg, Per; Knudstrup, Mary-Ann

    2014-01-01

    in the renovation sector. Numerous attempts for breaking barriers to sustainable renovation have been made and the impact on the environment including global energy use in buildings is the criterion which has been the main focus in the systems and tools of the last decade, yet without a major accomplishment...... in this paper. Methods have been primarily classified on the basis on whether or not they allow incorporating truthfully decision-makers’ individual values while still improving the process effectiveness. Reviewed tools have been classified as building analysis, optimization and decision making tools...

  6. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  7. Space planning: a renovation saga involving library users.

    Science.gov (United States)

    Norton, Hannah F; Butson, Linda C; Tennant, Michele R; Botero, Cecilia E

    2013-01-01

    From 2010 to 2012, librarians at the University of Florida Health Science Center Library (HSCL) used an online survey and focus groups to gather user input on preferences for an ideal library space. User input guided the HSCL's renovation plans and put a clear focus on enhancing technology, improving infrastructure, enabling group collaboration, and creating comfortable spaces. Additional communication with users during renovation was vital in ensuring continued usability of nonconstruction spaces and shared understanding of the construction timeline. While specific user suggestions are particular to the HSCL, overall themes and methods for eliciting input will be useful to other libraries undergoing space planning.

  8. CERN-PS Main Power Converter Renovation How to Provide and Control the Large Flow of Energy for a Rapid Cyclic Machine?

    CERN Document Server

    Bordry, Frederick; Völker, F V

    2005-01-01

    The PS accelerator (Proton-Synchrotron) at CERN, which is part of the LHC injector chain, is composed of one hundred magnets connected in series. During a typical acceleration cycle (taking 2.4 seconds), the active power at the magnet terminals varies from plus to minus 40 MW. As this large active power variation was not acceptable to the electrical network, a motor-generator set (M-G) was inserted between the grid and the load. The M-G set (of 1968) acts as a fly-wheel with a stored kinetic energy of 233 MJ and the magnets are fed via two 12-pulse thyristor rectifiers. A renovation or replacement of the installation is planned in the near future as part of the consolidation of the LHC injectors to avoid any major breakdown, to improve overall availability and to reduce operation and maintenance costs. This paper presents a first comparison of technical solutions available to build such a power system and the strategy that will be applied for the up-grade of the system.

  9. Experiences of homeowners regarding nearly zero-energy renovations and consequences for business models

    NARCIS (Netherlands)

    Mlecnik, E.; Straub, A.

    2015-01-01

    Pathways should be explored so that supply-side actors can present integrated renovations to homeowners in such a way that customers are confident with “nearly zero-energy” renovation. Understanding the real wishes of homeowners regarding integrated renovation can help to develop appropriate

  10. 77 FR 74472 - Application to Export Electric Energy; Energia Renovable S.C., LLC

    Science.gov (United States)

    2012-12-14

    ... Application to Export Electric Energy; Energia Renovable S.C., LLC AGENCY: Office of Electricity Delivery and... Renovable) has applied for authority to transmit electric energy from the United States to Mexico pursuant... application from Energia Renovable for authority to transmit electric energy from the United States to...

  11. Carbon balance of renovated grasslands: input- or output-driven?

    Science.gov (United States)

    Choncubhair, Órlaith Ní; Osborne, Bruce; Lanigan, Gary

    2015-04-01

    Temperate grasslands constitute over 30% of the Earth's naturally-occurring biomes and make an important contribution towards the partial mitigation of anthropogenic greenhouse gas emissions by terrestrial ecosystems. In permanent temperate grasslands, biomass production and sward quality can deteriorate over time and periodic renovation activities, involving soil tillage and reseeding, are commonly carried out to halt this decline. Long-term cultivation of agricultural land has been associated with soil aggregate degradation and reduced soil carbon storage. However, the impact of these single tillage disturbances on C cycling in grasslands is less clear. This study evaluated gaseous and dissolved organic carbon (DOC) losses following a single tillage event by subjecting grassland lysimeters with contrasting soil drainage characteristics to simulated conventional inversion or minimum tillage. Field-scale CO2 emissions after conventional tillage were also quantified and empirically modelled over short- and medium-term timeframes to delineate the ecosystem response to environmental variables. Soil moisture was the limiting determinant of ecosystem carbon release following conventional tillage. Freshly-tilled soils were associated with reduced water retention and increased sensitivity to soil moisture, which was particularly pronounced following rewetting events. Significantly elevated but ephemeral CO2 effluxes were detected in the hours following inversion ploughing, however tillage disturbance did not generate significantly enhanced C emission rates in the medium term. Equally, DOC losses were not significantly amplified by conventional tillage compared with conservative minimum tillage and were predominantly controlled by soil drainage across tillage regimes. Our results suggest that a net ecosystem source of 120 to 210 g C m-2 over an approximately two-month period was most likely a consequence of reduced productivity and C input rather than enhanced soil CO2

  12. Assessment of Safety Management System Implementation in an Approved Maintenance Organization: A Case Study of Nigeria Operators

    Directory of Open Access Journals (Sweden)

    Kole Osaretin Uhuegho

    2013-10-01

    Full Text Available In this study survey data was used to assess employees’ perceptions of Safety Management System (SMS implementation in an Approved Maintenance Organization (AMO in the aviation industry. AMOs in Nigeria were used as a case study. Results show that over 80% of the population used for this study accord to the existence of plans to implement SMS. However, results indicated a lack of safety management education, training and motivation, which are key concepts that influence all the safety management implementation process. Furthermore, results reveal the lack of skills to analyze risk associated with identified hazard. Internal audit and safety investigation are the main means of safety performance monitoring within the AMO. Hypothetical test was conducted using Chi-square statistic. The results show that there is no significant relationship between the appointment of key personnel and management commitment within an AMO safety management system. Overall, the findings suggest that AMO need to do more to improve the implementation and understanding of SMS within the AMO.

  13. 18 CFR 367.81 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Maintenance. 367.81... Expense Instructions § 367.81 Maintenance. (a) The cost of maintenance chargeable to the various operating... maintenance work. A list of work operations applicable generally to service company property is included...

  14. 46 CFR 185.702 - Maintenance.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Maintenance. 185.702 Section 185.702 Shipping COAST...) OPERATIONS Operational Readiness, Maintenance, and Inspection of Lifesaving Equipment § 185.702 Maintenance. (a) The manufacturer's instructions for onboard maintenance of survival craft, rescue boats,...

  15. IEA SHC Task 37: advanced housing renovation - Final report; IEA SHC Task 37: advanced housing renovation - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Hastings, R.

    2010-01-15

    This final report for the Swiss Federal Office of Energy (SFOE) reports on work done within the framework of the International Energy Agency's Solar Heating and Cooling program. The project addressed the energy consumption of residential buildings and their renovation. The report discusses the goals set for the project and reports on five projects that were initiated. These include the refurbishment of apartment buildings to meet the 'Passive House' standard, air-tightness, potential for the use of solar energy, solar facades and the renovation of historic listed buildings. Conclusions resulting from these projects are presented and discussed.

  16. Analysis of technical management key points based on power operation and maintenance%基于电力运行检修的技术管理要点分析

    Institute of Scientific and Technical Information of China (English)

    董正杰

    2016-01-01

    电力运行检修是电力运行管理维护中的一项重要工作,对保障电力系统正常稳定运行具有重要影响.本文主要探讨了电力运行检修管理中存在的主要问题,以及电力运行检修的技术管理要点,旨在提高电力运行检修质量与技术管理水平.%The power operation and maintenance is an important work in the maintenance of power operation management,which has an important influence on the normal and stable operation of power system.This paper mainly discusses the main problems in the operation and maintenance management of electricity,and the technical management of the operation and maintenance of electric power,aiming at improving the quality of power operation and maintenance and technical management level.

  17. Operation and maintenance service provision in uncertain times – the case of the FLSmidth Group during the Arab Spring

    DEFF Research Database (Denmark)

    Kreye, Melanie

    2016-01-01

    This case was written by Melanie E. Kreye. It was compiled based on primary data collection by the author such as interviews and observations and published secondary data by the case companies. The case was made possible through the generous co-operation of the FLSmidth Group. It is intended to b...

  18. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Baldock, Nick [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Sevilla, Fernando [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Redfern, Robin [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Storey, Alexis [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Kempenaar, Anton [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Elkinton, Chris [Garrad Hassan America, Inc., San Diego, CA (United States)

    2014-12-19

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 is to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model

  19. Maintenance of anaesthesia with sevoflurane and oxygen in mechanically-ventilated horses subjected to exploratory laparotomy treated with intra- and post operative anaesthetic adjuncts.

    Science.gov (United States)

    Carroll, G L; Hooper, R N; Rains, C B; Martinez, E A; Matthews, N S; Hartsfield, S M; Beleau, M H

    1998-09-01

    Eight healthy horses premedicated with xylazine and induced with ketamine were used to evaluate sevoflurane in oxygen for maintenance of anaesthesia during elective exploratory laparotomy. After orotracheal intubation, horses were hoisted, placed in dorsal recumbency on a padded surgery table, and received sevoflurane in oxygen for maintenance of anaesthesia. The horses were allowed to breathe spontaneously until instrumented; then, they were mechanically ventilated to maintain the PaCO2 between 35 and 45 mmHg. Systolic (SAP), diastolic (DAP), and mean (MAP) arterial blood pressures, heart rate (HR), ECG, respiratory rate, an estimation of the saturation of haemoglobin with oxygen in peripheral arterial blood (S(p)O2), nasal temperature, end-tidal CO2(ET(CO2)), end-tidal sevoflurane (ET(SEVO)), and vaporiser concentration were recorded every 5 min post induction; arterial blood samples were obtained soon after induction, at 30 min after induction, and every hour thereafter until surgery was completed. Recovery data including times from the sevoflurane vaporiser being turned off to first movement, to sternal recumbency, and to standing, number of attempts to stand, and recovery score (between 1 = safe, smooth and 6 = stormy, major injury to horse) were collected. Analysis of variance was performed using physiological data collected over 195 min of anaesthesia, the longest time period during which all 8 horses were instrumented. Time effects (P<0.05) for HR, SAP, DAP, MAP, and nasal temperature were identified. Heart rate peaked at 45 min and declined over the course of the procedure. Arterial blood pressure generally decreased over time. Body temperature decreased over time. From 15 to 195 min mean ET(SEVO)concentration ranged from 2.0 to 3.3%, while mean vaporiser settings ranged from 3.7 to 5.5%. Three horses received intra-operative ketamine; all horses received dobutamine infusions; and 2 horses received intra-operative calcium-dextrose. Total anaesthesia time

  20. Tenants’ experiences and satisfaction with renovated and energy retrofitted social housing

    DEFF Research Database (Denmark)

    Knudsen, Henrik Nellemose; Jensen, Ole Michael

    studied and verified. The objective of the present project was to evaluate tenants’ experiences and satisfaction with renovated and energy retrofitted social housing. A questionnaire was developed that included questions about perceived indoor climate, possible co-benefits, the renovation process, various...... construction-related measures as well as questions on changed habits after the renovation. The questionnaire was distributed in two large settlements of social housing erected in the 1960s, one representing a case of comprehensive renovation and another representing a case of more moderate renovation...

  1. Post Occupancy Evaluation of 23 Newly Renovated Apartments in Copenhagen

    DEFF Research Database (Denmark)

    Iqbal, Ahsan; Afshari, Alireza; Bergsøe, Niels Christian

    2016-01-01

    The present article is based on a yearlong post occupancy evaluation of indoor air quality of recently renovated 23 apartments in Copenhagen. The apartments are equipped with novel mechanical ventilation systems. The apartments can be categorised in four, according to the design of ventilation...

  2. Supply-side collaboration for energy-efficient renovations

    NARCIS (Netherlands)

    Straub, A.; Mlecnik, E.

    2015-01-01

    The supply side for nearly zero energy building (nZEB) renovation of owner-occupied single-family houses in Europe is suffering from a severe image problem of lack of knowledge and trust, inefficient construction processes, insufficient quality assurance and communication difficulties with home-owne

  3. Supply-side collaboration for energy-efficient renovations

    NARCIS (Netherlands)

    Straub, A.; Mlecnik, E.

    2015-01-01

    The supply side for nearly zero energy building (nZEB) renovation of owner-occupied single-family houses in Europe is suffering from a severe image problem of lack of knowledge and trust, inefficient construction processes, insufficient quality assurance and communication difficulties with home-owne

  4. RESISTANCE OF COATED ELECTRODES SUITABLE FOR RENOVATION OF TILLAGE TOOLS

    OpenAIRE

    2013-01-01

    This article deals with the abrasive wear resistance of additional materials. The resistance of individual materials was figured out by determining a proportional wear resistance on a grinding fabric. Results of the experiment confirmed an increase in welds abrasive wear resistance. Chosen coated electrodes are suitable for the renovation of tillage tools of agricultural machines.

  5. Resource Book for Furniture Renovation, Refinishing and Reupholstering.

    Science.gov (United States)

    Barton, Diane; Robinson, Jay

    This resource book for furniture renovation (refinishing and reupholstering) is one of four resource books developed for use in Code 30 or adult vocational programs in the home furnishings service area. Representative, illustrative, and informative materials contained in the resource book are Furniture Woods, Cuts and Matching Veneers, Wood…

  6. Renovation techniques for fatigue cracked orthotropic steel bridge decks

    NARCIS (Netherlands)

    de Jong, F.B.P.

    2007-01-01

    This dissertation presents the research into renovation techniques for orthotropic steel bridge decks. These techniques are needed to solve fatigue problems in the decks of these bridges, as several fatigue cracks have been detected in the deck structure of these bridges the last decade. A well-know

  7. Renovation of the outside lighting - Bldg. 112 zone

    CERN Multimedia

    GS Department

    2010-01-01

    Due to the renovation of the outside lighting, the traffic will be disrupted along “Route Feynman”. From the water tower (Bldg. 227) to Restaurant Nr. 2 (Bldg. 504) between 18 and 30 August. We recommend great caution. Thank you for your understanding. SEM Group

  8. Energy Renovation of a Typical Danish Single-family House

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Svendsen, Svend

    2007-01-01

    In 2006, new tighter energy performance requirements were introduced in Denmark for both new buildings and renovation, including a new classification system for low energy buildings. These demands are based on the directive on Energy Performance of Buildings, the EPBD (2002/91/EC). In general...

  9. Renovating Early Childhood Education Pedagogy: A Case Study in Vietnam

    Science.gov (United States)

    Thao, Dang Phuong; Boyd, Wendy Anne

    2014-01-01

    Since 2003, the Vietnamese government has prioritised curriculum reform efforts and commitment to improving the quality of the national curriculum. The Vietnamese early childhood education renovation has encountered considerable changes and challenges, particularly in the area of pedagogical approaches. Many early childhood teachers continue to…

  10. Post Occupancy Evaluation of 23 Newly Renovated Apartments in Copenhagen

    DEFF Research Database (Denmark)

    Iqbal, Ahsan; Afshari, Alireza

    2016-01-01

    The present article is based on the post occupancy occupants’ perception of indoor air quality of recently renovated 23 residential apartments in Copenhagen. The apartments are equipped with novel mechanical ventilation systems. The apartments can be categorised in four, according to the design o...

  11. ROLLING STOCK RENOVATION AS THE PRIORITY OF ULKRZALIZNYTSYA'S INVESTMENTS

    Directory of Open Access Journals (Sweden)

    N. A. Ghayduk

    2010-06-01

    Full Text Available This article is devoted to the basic sources of investments aimed at the renovation of stock of passenger coaches. Thus the rolling stock that is to be bought must meet the plans of strategic development of «Ukrzaliznytsia» (Ukrainian Railways, their financial possibilities and outlooks of the further market behavior of consumers (passengers.

  12. Supply-side collaboration for energy-efficient renovations

    NARCIS (Netherlands)

    Straub, A.; Mlecnik, E.

    2015-01-01

    The supply side for nearly zero energy building (nZEB) renovation of owner-occupied single-family houses in Europe is suffering from a severe image problem of lack of knowledge and trust, inefficient construction processes, insufficient quality assurance and communication difficulties with

  13. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  14. Business Process Reengineering in the Inventory Management to Improve Aircraft Maintenance Operations in the Indonesian Air Force

    Science.gov (United States)

    2006-06-01

    from the warehouse. JIT was used by the Ford Motor Company in the early 1920s before being adopted and publicized by the Toyota Motor Company ...industries in many countries, such as Kawasaki Motor Corp., Chrysler, Hyundai , General Electric, Hewlett- Master Production Schedule MRP System...for the helicopter immediately needed for a certain mission also can be purchased from the local aircraft company which operates the same helicopter

  15. Value based building renovation - A tool for decision-making and evaluation

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Maslesa, Esmir

    2015-01-01

    is to present a tool - RENO-EVALUE, which can be used as decision support for sustainable renovation projects, and for evaluation, during and after building renovations. The tool is a result from the European Eracobuild project ACES - "A concept for promotion of sustainable retrofitting and renovation in early...... interests and values of the main stakeholders involved in building renovation. It is meant as a basis for dialogue among building professionals and building users and supports formulation of objectives for renovation projects. RENO-EVALUE can also be used for comparing alternative project proposals......Research on the barriers for building renovation in Denmark has revealed that an important obstacle is a lack of simple and holistic tools that can assist stakeholders in prioritisation and decision-making during the early stages of building renovation projects. The purpose of this article...

  16. The Role of Logistics in Practical Levelized Cost of Energy Reduction Implementation and Government Sponsored Cost Reduction Studies: Day and Night in Offshore Wind Operations and Maintenance Logistics

    Directory of Open Access Journals (Sweden)

    Thomas Poulsen

    2017-04-01

    Full Text Available This paper reveals that logistics make up at least 17% of annual operational expenditure costs for offshore wind farms. Annual operational expenditure is found to vary by a factor of 9.5, making its share of levelized cost of energy for offshore wind range from 13% to 57%. These are key findings of a 20-month research project targeting cost reduction initiatives for offshore wind systems. The findings reveal that cost-out measures are difficult to implement due to cultural differences. Implementation efforts are rendered by personnel located offshore in a harsh sea environment which is in stark contrast to the shore-based office personnel who develop studies directing cost reduction efforts. This paper details the company motivation to join industry-wide cost reduction initiatives. A business case for offshore wind operations and maintenance logistics yielding 1% savings in levelized cost of energy is included on how to expand working hours from daytime to also work at night.

  17. The Role of Mitochondria in the Activation/Maintenance of SOCE: Store-Operated Ca(2+) Entry and Mitochondria.

    Science.gov (United States)

    Spät, András; Szanda, Gergö

    2017-01-01

    Mitochondria extensively modify virtually all cellular Ca(2+) transport processes, and store-operated Ca(2+) entry (SOCE) is no exception to this rule. The interaction between SOCE and mitochondria is complex and reciprocal, substantially altering and, ultimately, fine-tuning both capacitative Ca(2+) influx and mitochondrial function. Mitochondria, owing to their considerable Ca(2+) accumulation ability, extensively buffer the cytosolic Ca(2+) in their vicinity. In turn, the accumulated ion is released back into the neighboring cytosol during net Ca(2+) efflux. Since store depletion itself and the successive SOCE are both Ca(2+)-regulated phenomena, mitochondrial Ca(2+) handling may have wide-ranging effects on capacitative Ca(2+) influx at any given time. In addition, mitochondria may also produce or consume soluble factors known to affect store-operated channels. On the other hand, Ca(2+) entering the cell during SOCE is sensed by mitochondria, and the ensuing mitochondrial Ca(2+) uptake boosts mitochondrial energy metabolism and, if Ca(2+) overload occurs, may even lead to apoptosis or cell death. In several cell types, mitochondria seem to be sterically excluded from the confined space that forms between the plasma membrane (PM) and endoplasmic reticulum (ER) during SOCE. This implies that high-Ca(2+) microdomains comparable to those observed between the ER and mitochondria do not form here. In the following chapter, the above aspects of the many-sided SOCE-mitochondrion interplay will be discussed in greater detail.

  18. Quantification of risk considering external events on the change of allowed outage time and the preventive maintenance during power operation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, D. J.; Kim, K. Y.; Yang, J. E

    2001-03-01

    In this study, for the major safety systems of Ulchin Units 3/4, we quantify the risk on the change of AOT and the PM during power operation to identify the effects on the results of external events PSA when nuclear power plant changes such as allowed outage time are requested. The systems for which the risks on the change of allowed outage time are quantified are High Pressure Safety Injection System (HPSIS), Containment Spray System (CSS), and Emergency Diesel Generator (EDG). The systems for which the risks on the PM during power operation are Low Pressure Safety Injection System (LPSIS), CSS, EDG, Essential Service Water System (ESWS). Following conclusions can be obtained through this study: 1)The increase of core damage frequency ({delta}CDF) on the change of AOT and the conditional core damage probability (CCDP) on the on-line PM of each system are differently quantified according to the cases of considering only internal events or only external events. . 2)It is expected that the quantification of risk including internal and external events is advantageous for the licensee of NPP if the regulatory acceptance criteria for the technical specification changes are relatively set up. However, it is expected to be disadvantageous for the licensee if the acceptance criteria are absolutely set up. 3)It is expected that the conduction on the quantification of only a fire event is sufficient when the quantification of external events PSA model is required for the plant changes of Korea Standard NPPs. 4)It is expected that the quantification of the increase of core damage frequency and the incremental conditional core damage probability on technical specification changes are not needed if the quantification results of those considering only internal events are below regulatory acceptance criteria and the external events PSA results are not greatly affected by the system availability. However, it is expected that the quantification of risk considering external events

  19. Carbon footprint of construction, operation and maintenance of waterways and traffic; Merenkulun ja liikenteen hiilijalanjaelki. Osa 1: Merenkulun hiilijalanjaelki, Osa 2: Tie-, rata- ja meriliikenteen hiilijalanjaeljet

    Energy Technology Data Exchange (ETDEWEB)

    Illman, J.; Kumpulainen, A.; Pesola, A.; Vanhanen, J.

    2012-07-01

    In 2010, the Finnish Transport Agency launched a project to study the carbon footprint of the construction, use and maintenance of Finland's transport network infrastructure. This report presents the results of the second phase, where the carbon footprint was calculated for the coastal ports and fairways used for merchant shipping (part 1 of this report). In addition, the carbon footprint of traffic operating on the road and rail networks and on the coastal fairways was calculated (part 2 of this report). The carbon footprints of four Finnish coastal merchant shipping ports and the fairways leading into them were calculated during a 100-year period. Based on these four cases and statistics the rest of the coastal ports were categorised into four groups: passenger ports, unitized cargo ports, bulk ports and liquid bulk ports. Based on this categorisation the carbon footprint for the infrastructure of coastal merchant shipping was estimated. A carbon footprint tool was developed to enable the modelling of the impacts of different port and fairway planning parameters on the life-cycle emissions. The main source of emissions in the selected cases was the energy used during the use phase: the fuel used by the machinery or the electricity consumed during the operation of the port. In the construction of the examined ports and fairways, the materials used, their transportation and installation do not have a significant impact on the life-cycle emissions. The carbon footprint of Finland's coastal merchant shipping ports and fairways (35 ports and 3 230 km of fairways) during the 100-year period was estimated at 150 000 tCO{sub 2}/a. The emissions of ports vary between 1 900-15 000 tCO{sub 2}/a. The largest sources of emissions do not always originate from the use phase as in the selected cases. The emissions of construction and maintenance can be larger than of the use phase in ports that occupy a large area of land in relation to the amount of traffic flowing

  20. On the Operation State and Maintenance Management of the Current Overhead Transmission Line%试论目前架空输电线路状态运行与维护管理

    Institute of Scientific and Technical Information of China (English)

    许金明

    2014-01-01

    This paper analyzes the operation state and maintenance management status of the current overhead transmission line and describes the improvement countermeasures to improve the overall efficiency of the operation state and maintenance management of the overhead transmission line.%文章分析目前架空输电线路状态运行与维护管理基本现状,介绍了架空输电线路状态运行与维护管理完善对策,以期提高该架空输电线路状态运行与维护管理整体效率。

  1. Study on the opportunity and Countermeasure of operation and maintenance service industry after the development of wind power scale%风电规模发展后运维服务业的机会与对策研究

    Institute of Scientific and Technical Information of China (English)

    王华

    2016-01-01

    In this paper,the development of wind power after the operation and maintenance of service industry opportunities and Countermeasures of specific research,I hope this research can promote the development of China's operation and maintenance services.%本文就风电规模发展后运维服务业的机会与对策进行了具体研究,希望这一研究能够推动我国运维服务业的相关发展.

  2. PV-BUK: Operating and maintenance costs of photovoltaic installations; PV-BUK - Betriebs- und Unterhaltskosten von PV-Anlagen - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Stettler, S.; Toggweiler, P. [Enecolo AG, Moenchaltorf (Switzerland); Ruoss, D.; Schudel, P. [Envision, Lucerne (Switzerland); Kottmann, A.; Steinle, F. [BE Netz AG, Lucerne (Switzerland)

    2008-03-15

    This final report elaborated for the Swiss Federal Office of Energy (SFOE) takes a look at the results of a project carried out to determine the costs for facility management, to estimate future cost development and to propose activities for the further reduction of the operation and maintenance costs of photovoltaic systems. Information on the cost situation was collected by literature study, as well as in interviews and surveys with photovoltaic (PV) experts and the owners of PV installations. The discussion of the results at a workshop with about 20 Swiss PV experts is noted. The results are presented and discussed. These show that operating costs per kWh decrease with the size of the PV system. Figures are quoted. The major part of the costs are quoted as being those for spare parts, especially for the inverter. The authors are of the opinion that, in future, costs for facility management will further decrease, as they are partly linked to capital and insurance costs. Potential for optimisation is said to exist in several areas of facility management such as, for example, in system monitoring and fast reaction in the case of malfunctions.

  3. Optimizing the operation of the Qingshitan Reservoir in the Lijiang River for multiple human interests and quasi-natural flow maintenance

    Institute of Scientific and Technical Information of China (English)

    Qiuwen Chen; Duan Chen; Ruiguang Han; Ruonan Li; Jinfeng Ma; Koen Blanckaert

    2012-01-01

    For reservoir operation,maintaining a quasi-natural flow regime can benefit river ecosystems,but may sacrifice human interests.This study took the Qingshitan Reservoir in the Lijiang River as a case,and developed an optimization model to explore a trade-off solution between social-economic interests and nature flow maintenance on a monthly base.The objective function considered irrigation,cruise navigation and water supply aspects.An index of flow alteration degree was proposed to measure the difference between the regulated discharge and the natural flow.The index was then used as an additional constraint in the model besides the conventional constraints on reservoir safety.During model solving,different criteria were applied to the index,representing various degrees of alteration of the natural flow regime in the river.Through the model,a relationship between social-economic interests and flow alteration degree was established.Finally,a trade-off solution of the reservoir operation was defined that led to a favorable social-economic benefit at an acceptable alteration of the natural flow.

  4. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  5. Software Maintenance.

    Science.gov (United States)

    Cannon, Glenn; Jobe, Holly

    Proper cleaning and storage of audiovisual aids is outlined in this brief guide. Materials and equipment needed for first line maintenance are listed, as well as maintenance procedures for records, audio and video tape, film, filmstrips, slides, realia, models, prints, graphics, maps, and overhead transparencies. A 15-item quiz on software…

  6. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    , acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4

  7. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    , acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine

  8. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine

  9. Renovation work on the Geneva motorway bypass

    CERN Multimedia

    2006-01-01

    The motorway maintenance work currently in progress includes repair work on the Vernier bridge. Temporary traffic restrictions will be in place during summer 2006. From 12 June 2006, for a period of 11 weeks Traffic arriving from the route de Vernier (in the direction of the city centre) will not be able to turn left onto the Vernier bridge to join the motorway but will be deviated via the route de Pré-Bois. From 3 July 2006, for a period of 8 weeks Traffic arriving from the Vernier motorway tunnel (in the direction of Lausanne) and exiting onto the route de Vernier will not be able to turn left. Vehicles will be deviated via the road that runs parallel to the motorway, then via the route de Meyrin and the route de Pré-Bois. Users are invited to follow the road signs in place. For further information: Tel. 163 or www.autoroute-aeroport.ch State of Geneva Department of Construction and Information Technology Civil Engineering Department

  10. Renovation work on the Geneva motorway bypass

    CERN Document Server

    2006-01-01

    The motorway maintenance work currently in progress includes repair work on the Vernier bridge. Temporary traffic restrictions will be in place during summer 2006. From 12 June 2006, for a period of 11 weeks Traffic arriving from the route de Vernier (in the direction of the city centre) will not be able to turn left onto the Vernier bridge to join the motorway but will be deviated via the route de Pré-Bois. From 3 July 2006, for a period of 8 weeks Traffic arriving from the Vernier motorway tunnel (in the direction of Lausanne) and exiting onto the route de Vernier will not be able to turn left. Vehicles will be deviated via the road that runs parallel to the motorway, then via the route de Meyrin and the route de Pré-Bois. Users are invited to follow the road signs in place. For further information: Tel. 163 or www.autoroute-aeroport.ch State of GenevaDepartment of Construction and Information Technology Civil Engineering Department

  11. Sustainable renovation concepts for single-family houses

    DEFF Research Database (Denmark)

    Vanhoutteghem, Lies; Tommerup, Henrik M.; Svendsen, Svend

    countries are to have competitive power compared to new houses on the future housing market. If the market is able to explain this to the homeowners there is an open market with undreamt-of possibilities. Good technical solutions exist but need to be combined based on the full range of (standard) solutions......, energy efficient renovation will probably still be attractive for the average homeowner. One-stop-shops in the form of full-service providers of energy efficient renovation of singlefamily house are missing in the Nordic countries. This service is vital to open up the market. A one-stop-shop could...... an economy in balance in the sense that the annual payment on a cheap loan, e.g. mortgage refinancing, to finance the investment is not fully offset by the expected annual energy savings. Since, the cost of energy measures today may not correspond to the increased market value of the house, it is important...

  12. PCB i bygninger - afhjælpning, renovering og nedrivning

    DEFF Research Database (Denmark)

    Andersen, Helle Vibeke

    SBi-anvisning 268 beskriver, hvordan PCB-forurening af indeluften afhjælpes, og hvordan PCB håndteres, når man renoverer eller nedriver bygninger med PCB. Uanset om der er tale om afhjælpning, renovering eller nedrivning, kan arbejdet generere PCB-holdigt affald. Anvisningen forklarer derfor......, hvordan affaldet skal håndteres, og hvordan man beskytter mennesker og miljø under arbejdet. Anvisningen er baseret på byggebranchens erfaringer og den aktuelle forskningsbaserede viden om PCB i bygninger. SBi-anvisning 268 afløser den snart fire år gamle SBi-anvisning 242 om renovering af bygninger med...... PCB, som ikke behandlede spørgsmålet om affaldshåndtering....

  13. Defining Sustainability in Relation to the Renovation of Modern Housing

    DEFF Research Database (Denmark)

    Peters, Terri

    2011-01-01

    Summary This paper focuses on comparing practice-based and academic definitions and metrics of “sustainability” as they relate to the transformation of Modern housing in Denmark. Keywords:Sustainability, Renovation, Architecture, Denmark, Modern housing 1. Introduction to the Study Buildings...... and measure sustainability in Denmark. 3. Method and Approach This study aims to create results that can be useful to both academic research in this area and architects in practice. Architects can benefit from knowing what is currently being designed and built, what strategies were used and when in the design...... for example) and post occupancy data to see if designs are performing as predicted. Further study could also involve comparison of emerging, smaller assessment systems to see how they serve sustainability and renovation....

  14. Renovation and Expansion of the Caspary Research Building. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Grassia, V. L.

    2004-02-07

    Critical to the Hospital's rebuilding efforts have been its public partners at the federal, state, and local government levels who have made a major financial commitment to renovating the Hospital's research infrastructure. To date, the Hospital for Special Surgery (HSS) has been awarded a total of nearly $8.5 million to create and equip new, state-of-the-art laboratories for scientific investigations. The modernization of the Hospital's research facilities was jump-started in 1998 with a $950,000 seed grant from the National Institutes of Health (NIH) to renovate laboratories for immunology research in the Caspary Research Building. Coupled with a matching $5.5 million commitment from HSS, this infusion of NIH funding laid the groundwork for an overhaul of all of the Hospital's research space.

  15. Selective Maintenance Model Considering Time Uncertainty

    OpenAIRE

    Le Chen; Zhengping Shu; Yuan Li; Xuezhi Lv

    2012-01-01

    This study proposes a selective maintenance model for weapon system during mission interval. First, it gives relevant definitions and operational process of material support system. Then, it introduces current research on selective maintenance modeling. Finally, it establishes numerical model for selecting corrective and preventive maintenance tasks, considering time uncertainty brought by unpredictability of maintenance procedure, indetermination of downtime for spares and difference of skil...

  16. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    , acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant

  17. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    , acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4

  18. Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

    2009-03-31

    , acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine

  19. Overheating risk barriers to energy renovations of single family houses

    DEFF Research Database (Denmark)

    Psomas, Theofanis Ch.; Heiselberg, Per Kvols; Duer, Karsten

    2016-01-01

    Highlights •Energy renovations of houses in moderate climates increase overheating risk. •Critical measures are the floor insulation and the improvement of the airtightness. •Decrease of the g value of windows diminishes the intensity and the period of it. •Static method of assessment shows highe...... risk compare to the dynamic method. •Ranking capabilities of overheating indices and average temperatures are analogous....

  20. Renovation and Involution-Paradox of Chinese Literature in Modernity

    Institute of Scientific and Technical Information of China (English)

    XU Yi-bin

    2013-01-01

    With a special matter, Chinese literature has differences with traditional theories from western countries in essence, so that Chinese literature demonstrates its renovation and involution. The main reason is its trends of modernity. The transformation from oversea exchange is very important. This paper mainly explains the specific content of paradox of Chinese literature in mo-dernity, and explores the reasons for differences between China and western countries.