  1. Installation of a Wastewater SCADA Monitoring System at Fort Bragg, NC

    National Research Council Canada - National Science Library

    Mullaney, Joe

    2004-01-01

    .... The Wastewater SCADA Monitoring System was installed to monitor 26 remote sites. A detailed radio study of the area verified the feasibility of using radio equipment to transfer data from these sites...

  2. Pipelines, utilities plan over 150 scada systems

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that North American pipelines and utilities will spend more than $170 million on new or upgraded supervisory control and data acquisition (scada) systems during the 30-month period that commenced Sept. 1. Another $12.5 million will be spent on peripherals and consulting. Among the 699 various projects to be implemented during the period, companies will install 151 scada systems, add 154 remote-terminal units (RTUs) to existing scada units, and install 196 communications systems. Scada systems are computerized hardware and software systems that perform a set of monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  3. Computer-Based Monitoring and Remote Controlling for Oil Well Pumps Using Scada

    Directory of Open Access Journals (Sweden)

    Rudi Tjiptadi

    2011-12-01

    Full Text Available The research aims to change manually the monitoring and controlling of oil well pumps into a computer-based system using SCADA (Supervisory and Data Acquisition system. To design the protection system which consists of controller unit and display system, RTU (Remote Terminal Unit and MTU (Master Terminal Unit are used. The research results in a controller unit which is able to communicate to personal computer using RS-232 C and an alarm system to protect oil pump motors by detecting sensors installed at the pumps. 

  4. Automated turn pike using PLC and SCADA

    Science.gov (United States)

    Silpa Sreedhar, P.; Aiswarya, P.; Kathirvelan, J.

    2017-11-01

    We propose a smart turnpike based on Programmable Logic Controller (PLC) and Supervisory Control and Data Acquisition Systems (SCADA) in this paper. In this work, the basic idea is to measure the weight of the vehicles and classify them according to its weight to the respective lanes. It is difficult for the turnpike people to monitor the whole process all the time. So, this PLC based diversion system can be implemented in turnpikes to reduce the difficulties. This method will work based on weight sensors (piezo-resistive) whose output will be fed to a PLC, which will control the vehicle diversion. Using SCADA software, the whole process can be monitored from a remote area. The algorithm developed in this successfully installed in real time system.

  5. SCADA Architecture for Natural Gas plant

    Directory of Open Access Journals (Sweden)

    Turc Traian

    2009-12-01

    Full Text Available The paper describes the Natural Gas Plant SCADA architecture. The main purpose of SCADA system is remote monitoring and controlling of any industrial plant. The SCADA hardware architecture is based on multi-dropping system allowing connecting a large number of different fiels devices. The SCADA Server gathers data from gas plant and stores data to a MtSQL database. The SCADA server is connected to other SCADA client application offers a intuitive and user-friendly HMI. The main benefit of using SCADA is real time displaying of gas plant state. The main contriobution of the authors consists in designing SCADA architecture based on multi-dropping system and Human Machine Interface.

  6. Power system SCADA and smart grids

    CERN Document Server

    Thomas, Mini S

    2015-01-01

    Power System SCADA and Smart Grids brings together in one concise volume the fundamentals and possible application functions of power system supervisory control and data acquisition (SCADA). The text begins by providing an overview of SCADA systems, evolution, and use in power systems and the data acquisition process. It then describes the components of SCADA systems, from the legacy remote terminal units (RTUs) to the latest intelligent electronic devices (IEDs), data concentrators, and master stations, as well as:Examines the building and practical implementation of different SCADA systemsOf

  7. Design and development of an IoT-based web application for an intelligent remote SCADA system

    Science.gov (United States)

    Kao, Kuang-Chi; Chieng, Wei-Hua; Jeng, Shyr-Long

    2018-03-01

    This paper presents a design of an intelligent remote electrical power supervisory control and data acquisition (SCADA) system based on the Internet of Things (IoT), with Internet Information Services (IIS) for setting up web servers, an ASP.NET model-view- controller (MVC) for establishing a remote electrical power monitoring and control system by using responsive web design (RWD), and a Microsoft SQL Server as the database. With the web browser connected to the Internet, the sensing data is sent to the client by using the TCP/IP protocol, which supports mobile devices with different screen sizes. The users can provide instructions immediately without being present to check the conditions, which considerably reduces labor and time costs. The developed system incorporates a remote measuring function by using a wireless sensor network and utilizes a visual interface to make the human-machine interface (HMI) more instinctive. Moreover, it contains an analog input/output and a basic digital input/output that can be applied to a motor driver and an inverter for integration with a remote SCADA system based on IoT, and thus achieve efficient power management.

  8. Behavioral Profiling of Scada Network Traffic Using Machine Learning Algorithms

    Science.gov (United States)

    2014-03-27

    Acquisition ( SCADA ) System Overview SCADA systems control and monitor processes for water distribution, oil and natural gas pipelines , electrical...the desire for remote control and monitoring of industrial processes. The ability to identify SCADA devices on a mixed traffic network with zero...optimal attribute subset, while maintaining the desired TPR of .99 for SCADA network traffic. The attributes and ML algorithms chosen for

  9. Towards a Cyber Defense Framework for SCADA Systems Based on Power Consumption Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Jimenez, Jarilyn M [ORNL; Chen, Qian [Savannah State University; Nichols, Jeff A. {Cyber Sciences} [ORNL; Calhoun, Chelsea [Savannah State University; Sykes, Summer [Savannah State University

    2017-01-01

    Supervisory control and data acquisition (SCADA) is an industrial automation system that remotely monitor, and control critical infrastructures. SCADA systems are major targets for espionage and sabotage attackers. According to the 2015 Dell security annual threat report, the number of cyber-attacks against SCADA systems has doubled in the past year. Cyber-attacks (i.e., buffer overflow, rootkits and code injection) could cause serious financial losses and physical infrastructure damages. Moreover, some specific cyber-attacks against SCADA systems could become a threat to human life. Current commercial off-the-shelf security solutions are insufficient in protecting SCADA systems against sophisticated cyber-attacks. In 2014 a report by Mandiant stated that only 69% of organizations learned about their breaches from third entities, meaning that these companies lack of their own detection system. Furthermore, these breaches are not detected in real-time or fast enough to prevent further damages. The average time between compromise and detection (for those intrusions that were detected) was 205 days. To address this challenge, we propose an Intrusion Detection System (IDS) that detects SCADA-specific cyber-attacks by analyzing the power consumption of a SCADA device. Specifically, to validate the proposed approach, we chose to monitor in real-time the power usage of a a Programmable Logic Controller (PLC). To this end, we configured the hardware of the tetsbed by installing the required sensors to monitor and collect its power consumption. After that two SCADA-specific cyber-attacks were simulated and TracerDAQ Pro was used to collect the power consumption of the PLC under normal and anomalous scenarios. Results showed that is possible to distinguish between the regular power usage of the PLC and when the PLC was under specific cyber-attacks.

  10. Key management issue in SCADA networks: A review

    Directory of Open Access Journals (Sweden)

    Abdalhossein Rezai

    2017-02-01

    Full Text Available Supervisory Control And Data Acquisition (SCADA networks have a vital role in Critical Infrastructures (CIs such as public transports, power generation systems, gas, water and oil industries, so that there are concerns on security issues in these networks. The utilized Remote Terminal Units (RTUs and Intelligence Electronic Devices (IEDs in these networks have resource limitations, which make security applications a challenging issue. Efficient key management schemes are required besides lightweight ciphers for securing the SCADA communications. Many key management schemes have been developed to address the tradeoff between SCADA constrain and security, but which scheme is the most effective is still debatable. This paper presents a review of the existing key management schemes in SCADA networks, which provides directions for further researches in this field.

  11. What SCADA systems can offer to optimize field operations

    International Nuclear Information System (INIS)

    McLean, D.J.

    1997-01-01

    A new technology developed by Kenomic Controls Ltd. of Calgary was designed to solve some of the problems associated with producing gas wells with high gas to liquids ratios. The rationale and the system architecture of the SCADA (Supervisory Control and Data Acquisition) system were described. The most common application of SCADA is the Electronic Flow Measurement (EFM) installation using a solar or thermo-electric generator as a power source for the local electronics. Benefits that the SCADA system can provide to producing fields such as increased revenue, decreased operating costs, decreased fixed capital and working capital requirements, the planning and implementation strategies for SCADA were outlined. A case history of a gas well production optimization system in the Pierceland area of northwest Saskatchewan was provided as an illustrative example. 9 figs

  12. The benefits of SCADA integrated pipeline leak detection

    Energy Technology Data Exchange (ETDEWEB)

    Pichler, Ruprecht M.J. [Pichler Engineering GmbH, Munich (Germany)

    2003-07-01

    Software based leak detection and locating for pipelines based upon evaluation of hydraulic parameters is a widely used approach to online pipeline integrity monitoring. Typically, these software packages are installed in a stand-alone configuration with a narrow bandwidth interface to the pipeline SCADA system. However, the performance characteristics of the SCADA system and interface do have a substantial impact on the performance of the leak detection system. By a tight integration of leak detection software into the SCADA system, a source of false alarms typically experienced with leak detection systems can be eliminated, the overall performance of the leak detection system can be improved, and the project costs can be reduced. (author)

  13. Development of a generic wind farm SCADA system

    Energy Technology Data Exchange (ETDEWEB)

    Smith, G.

    2001-07-01

    The aim of the project is to develop a 'Generic Wind Farm Supervisory Control and Data Acquisition (SCADA) System' for the wind energy industry. A SCADA is a computer-based system that allows local and remote control of basic wind turbine functions and collects data from the wind farm that can be used to analyse and report on the operational performance. As wind farm size, complexity and remoteness of location increase an industry standard SCADA is vitally important to allow effective operation, monitoring, control and reporting. Turbine manufacturers offer a number of existing systems but these do not always fully meet the needs of wind farm operators and owners. Operators and owners who are involved with more than one turbine supplier end up with a number of incompatible systems. This causes operational difficulties and makes it hard to compared performance data from different turbines. This project aims to address these issues and develop a system that will communicate with all turbine types and calculate and store performance data in a consistent way. (Author)

  14. Pipeline, utilities to spend $127 million on scada systems

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Spending for new or upgraded supervisory control and data acquisition (scada) systems and for additional remote-terminal units (RTUs) by North American pipelines and utilities will exceed $165 million through February 1996. New and updated scada systems will total 122 at a cost of more than $127 million; 143 RTU add-on projects will cost more than $38 million. Pipelines and combined utilities/pipelines will spend $89.5 million for 58 scada-system projects and $30.2 million for RTU add-on projects. Scada systems are computerized hardware and software systems that perform monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production-plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  15. Security and SCADA protocols

    International Nuclear Information System (INIS)

    Igure, V. M.; Williams, R. D.

    2006-01-01

    Supervisory control and data acquisition (SCADA) networks have replaced discrete wiring for many industrial processes, and the efficiency of the network alternative suggests a trend toward more SCADA networks in the future. This paper broadly considers SCADA to include distributed control systems (DCS) and digital control systems. These networks offer many advantages, but they also introduce potential vulnerabilities that can be exploited by adversaries. Inter-connectivity exposes SCADA networks to many of the same threats that face the public internet and many of the established defenses therefore show promise if adapted to the SCADA differences. This paper provides an overview of security issues in SCADA networks and ongoing efforts to improve the security of these networks. Initially, a few samples from the range of threats to SCADA network security are offered. Next, attention is focused on security assessment of SCADA communication protocols. Three challenges must be addressed to strengthen SCADA networks. Access control mechanisms need to be introduced or strengthened, improvements are needed inside of the network to enhance security and network monitoring, and SCADA security management improvements and policies are needed. This paper discusses each of these challenges. This paper uses the Profibus protocol as an example to illustrate some of the vulnerabilities that arise within SCADA networks. The example Profibus security assessment establishes a network model and an attacker model before proceeding to a list of example attacks. (authors)

  16. SCADA System of Physicochemical Variables in a Mixture Separator

    Directory of Open Access Journals (Sweden)

    Claudia Marcela Bustamante Álvarez

    2015-01-01

    Full Text Available This paper presents the results of a research project developed by professors from Universidad de los Llanos and Colciencias Young Researcher, whose aim is to implement the necessary instrumentation to monitor and control with a SCADA system of physicochemical variables for a mixture separation process in oily water, thereby seeking to minimize environmental damage in water sources. The project was divided into three methodological stages: the establishment of interest variables, the design and implementation of the SCADA system, and the testing for results validation. This system has sensors to capture and transfer data to a PLC (S71200 for each of the system variables such as temperature, level, flow and pH. It also has HMI interface for interacting with the system. The SCADA system greatly facilitates process monitoring and establishes the possibility of remote action, just by providing the programmable logic controller (PLC to an Ethernet network.

  17. Design and Application of SCADA Based Control System for filling process (Inter facing and Monitoring)

    International Nuclear Information System (INIS)

    Aung Naing Myint; Maung Maung Latt; Win Khaing Moe; Theingi

    2008-06-01

    In a small SCADA system, using industrial standard components and simulating real world applications, designs and constructs for thesis to interface between automation devices and software. It programs PIC microcontroller that need the information to write the sequence of process that flowchart like the PIC ladder-logic programs that control the equipment in system, software integrators to be required the information for the configuration screens and hardware installers which need the information to install and connect the equipment. It uses the initiating processor's multiplexer to verify that data or signals are being transmitted out of the parallel port and includes auto-coupler to divide different voltages between circuits and computer. Existing SCADA system are divisible into two groups - cheap and inflexible control, and another one is expensive but flexible control. This thesis attempted by means of using other network for SCADA communications and simple for control, both of which maintain flexibility while reducing cost

  18. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication

    Directory of Open Access Journals (Sweden)

    Miro Antonijević

    2018-03-01

    Full Text Available Most electrical substations are remotely monitored and controlled by using Supervisory Control and Data Acquisition (SCADA applications. Current SCADA systems have been significantly enhanced by utilizing standardized communication protocols and the most prominent is the IEC 61850 international standard. These enhancements enable improvements in different domains of SCADA systems such as communication engineering, data management and visualization of automation process data in SCADA applications. Process data visualization is usually achieved through Human Machine Interface (HMI screens in substation control centres. However, this visualization method sometimes makes supervision, control and maintenance procedures executed by engineers slow and error-prone because it separates equipment from its automation data. Augmented reality (AR and mixed reality (MR visualization techniques have matured enough to provide new possibilities of displaying relevant data wherever needed. This paper presents a novel methodology for visualizing process related SCADA data to enhance and facilitate human-centric activities in substations such as regular equipment maintenance. The proposed solution utilizes AR visualization techniques together with standards-based communication protocols used in substations. The developed proof-of-concept AR application that enables displaying SCADA data on the corresponding substation equipment with the help of AR markers demonstrates originality and benefits of the proposed visualization method. Additionally, the application enables displaying widgets and 3D models of substation equipment to make the visualization more user-friendly and intuitive. The visualized SCADA data needs to be refreshed considering soft real-time data delivery restrictions. Therefore, the proposed solution is thoroughly tested to demonstrate the applicability of proposed methodology in real substations.

  19. Low-Cost SCADA System Using Arduino and Reliance SCADA for a Stand-Alone Photovoltaic System

    Directory of Open Access Journals (Sweden)

    Ibrahim Allafi

    2018-01-01

    Full Text Available SCADA (supervisory control and data acquisition systems are currently employed in many applications, such as home automation, greenhouse automation, and hybrid power systems. Commercial SCADA systems are costly to set up and maintain; therefore those are not used for small renewable energy systems. This paper demonstrates applying Reliance SCADA and Arduino Uno on a small photovoltaic (PV power system to monitor the PV current, voltage, and battery, as well as efficiency. The designed system uses low-cost sensors, an Arduino Uno microcontroller, and free Reliance SCADA software. The Arduino Uno microcontroller collects data from sensors and communicates with a computer through a USB cable. Uno has been programmed to transmit data to Reliance SCADA on PC. In addition, Modbus library has been uploaded on Arduino to allow communication between the Arduino and our SCADA system by using MODBUS RTU protocol. The results of the experiments demonstrate that SCADA works in real time and can be effectively used in monitoring a solar energy system.

  20. Community energy storage and distribution SCADA improvements

    International Nuclear Information System (INIS)

    Riggins, M.

    2010-01-01

    The mission of American Electric Power (AEP) is to sustain the real time balance of energy supply and demand. Approximately 2.5 percent of energy generated in the United States (USA) is stored as pumped hydro, compressed air, or in batteries and other devices. This power point presentation discussed the use of SCADA for improving community energy storage (CES) and distribution systems. CES is a distributed fleet of small energy units connected to the transformers in order to serve houses or small commercial loads. CES is operated as a fleet offering multi-megawatt (MW) multi-hour storage. The benefits of CES include backup power, flicker mitigation, and renewable integration. Benefits to the electricity grid include power factor correct, ancillary services, and load leveling at the substation level. SCADA is being used to determine when emergency load reductions are required or when emergency inspections on fans, oil pumps or other devices are needed. An outline of AEP's monitoring system installation plan was also included. tabs., figs.

  1. EMS applications integration in a SCADA; Integracion de aplicaciones EMS en un SCADA

    Energy Technology Data Exchange (ETDEWEB)

    Roses, Rodolfo; Colome, D.G.; Orduna, E.; Vega, C. de la; Camisay, G. [Universidad Nacional de San Juan (Argentina). Inst. de Energia Electrica]. E-mail: roses@iee.unsj.edu.ar

    2001-07-01

    This paper presents the methodology to integrate EMS (Energy Management System) functions in a SCADA system (System Control and Data Acquisition). The implementation methodology of the EMS applications has included the design and database implementation, EMS-SCADA communication, results presentation, logics definition of execution and processing ways. The applications portability characteristics allow integration with different SCADA system with some adaptations on the data communication interface. Thus, a open system has been obtained and implemented successfully in the control center of an Argentine 132 kV network.

  2. Assessing and Augmenting SCADA Cyber Security-A Survey of Techniques

    OpenAIRE

    Patel, S; Nazir, S; Patel, D

    2017-01-01

    SCADA systems monitor and control critical infrastructures of national importance such as power generation and distribution, water supply, transportation networks, and manufacturing facilities. The pervasiveness, miniaturisations and declining costs of internet connectivity have transformed these systems from strictly isolated to highly interconnected networks. The connectivity provides immense benefits such as reliability, scalability and remote connectivity, but at the same time exposes an ...

  3. Vulnerability assessment of critical infrastructure : activity 2 progress report : information of SCADA systems and other security monitoring systems used in oil and gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gu, G.P. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Materials Technology Laboratory

    2007-12-15

    Many pipelines are located in remote regions and subjected to harsh environmental conditions. Damage to pipelines can have significant economic and environmental impacts. This paper discussed the use of supervisory control and data acquisition (SCADA) systems to monitor and control oil and gas pipeline infrastructure. SCADA systems are a real time, distributed computerized system with an intelligent capability for condition identification and fault diagnosis. SCADA systems can be used to capture thousands of miles of pipeline system process data and distribute it to pipeline operators, whose work stations are networked with the SCADA central host computer. SCADA architectures include monolithic, distributed, and networked systems that can be distributed across wide area networks (WANs). SCADA security strategies must be implemented to ensure corporate network security. Case studies of SCADA systems currently used by oil and gas operators in Alberta were also presented. 15 refs., 1 fig.

  4. Remote installation of risers on underground nuclear waste storage tanks

    International Nuclear Information System (INIS)

    Jackson, J.P.; Gessner, R.F.

    1988-03-01

    The West Valley Demonstration Project was established to solidify 2120 m 3 (560,000) gallons of high-level nuclear waste generated during six years of commercial nuclear fuel reprocessing. This liquid will be processed to remove radioactive elements which, with the remaining sludge, will be combined with glass formers and be converted into borosilicate glass. Risers were installed on the high-level tank for installation of pumps which will be used to remove the liquid and sludge. The extensive use of remote technology was required to install the risers and to minimize operator exposure to high levels of radiation and contamination. The riser installation required remotely: drilling through two feet of concrete shielding; installing pump access pipes which are welded to the tank top; and cutting holes in tanks located 3658 mm (12) feet below ground. These operations were successfully completed 13 times without exposing personnel to high-level radiation or contamination. Specially designed remote equipment was developed for each step of this operation. Extensive operator training in the use of this equipment was performed on a tank with low radiation prior to work on the high-level tank. This paper discusses the application of remote technology that assured a quality job was safely accomplished. 3 refs., 18 figs., 2 tabs

  5. Disain Sistem SCADA jarak Jauh Menggunakan Layanan VPN 3G Untuk Penggerak Pompa pada Sistem Pengolahan Air

    Directory of Open Access Journals (Sweden)

    Asep Insani

    2013-03-01

    Full Text Available Dalam pengolahan air gambut menjadi air bersih yang menggunakan metode AOP dan RO ini, pengaturan tekanan pompa merupakan sesuatu yang sangat vital pada saat dilakukan suplay air yang akan diolah ke sistem. Sistem pengolahan air yang menggunakan pompa tersebut harus selalu dipastikan beroperasi dengan normal disesuaikan dengan peruntukannya. Manajemen terbaru sistem pengolahan air memerlukan teknologi yang terbaru pada peralatan remote control system, dan yang paling fundamental untuk hal ini adalah penggunaan layanan public untuk akusisi dan pengawasan dari data yang diambil dari peralatan kontrol. Untuk mewujudkan remote control untuk pompa dengan tekanan tertentu dengan PLC, didisain dengan kombinasi antara internet, arsitektur dan implementasi dari sistem SCADA, yang menggabungkan jaringan komputer, PLC, WinCC, dan teknologi VPN. Dalam melakukan disain, perlu diperhatikan poin-poin penting baik dari sisi server maupun sisi controller. Disain sistem SCADA remote dapat mengefisienkan waktu bagi operator dan pemantauan lebih lanjut untuk suplay air.

  6. Wind Turbine Fault Detection based on Artificial Neural Network Analysis of SCADA Data

    DEFF Research Database (Denmark)

    Herp, Jürgen; S. Nadimi, Esmaeil

    2015-01-01

    Slowly developing faults in wind turbine can, when not detected and fixed on time, cause severe damage and downtime. We are proposing a fault detection method based on Artificial Neural Networks (ANN) and the recordings from Supervisory Control and Data Acquisition (SCADA) systems installed in wind...

  7. Remote handling installation of diagnostics in the JET Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Allan, P., E-mail: Peter.Allan@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Loving, A.B. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Omran, H. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom); Collins, S.; Thomas, J. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Parsloe, A.; Merrigan, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); British Nuclear Services, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Hassall, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom)

    2011-10-15

    The requirement for an upgrade of the diagnostics for the JET ITER Like Wall (ILW) while maintaining personnel exposure to contamination as low as reasonably practicable or ALARP, has necessitated the development of a bespoke set of diagnostic components. These components, by virtue of their design and location, require a versatile yet comprehensive suite of remote handling tools to undertake their in-vessel installation. The installation of the various diagnostic components is covered in multiple tasks. Each task requires careful assessment and design of tools that can successfully interface with the components and comply with the handling and installation requirements. With remote maintenance a requirement, the looms/conduits were designed to be modular with connections which are electrically connected when the module is fitted or conversely disconnected when removed. The shape of each complex and often bulky component is verified during the design phase, to ensure that it can be delivered and installed to its specified location in the torus. This is done by matching the kinematic capabilities of the remote handling system and the path of the component through the torus by using a state of the art virtual reality system.

  8. Flow whitelisting in SCADA networks

    NARCIS (Netherlands)

    Barbosa, Rafael Ramos Regis; Sadre, Ramin; Pras, Aiko

    2013-01-01

    Supervisory control and data acquisition (SCADA) networks are commonly deployed in large industrial facilities. Modern SCADA networks are becoming more vulnerable to cyber attacks due to the common use of standard communications protocols and increased interconnections with corporate networks and

  9. Willowglen Systems Inc. : 8 case studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The various supervisory control and data acquisition (SCADA) systems designed by Willowglen Systems Inc. were described. The company provides custom SCADA technology products, automation systems, and technical services for various applications. Their remote terminal units (RTUs) were designed to have a very low power consumption rate, and can be operated from any power source. The company has also designed integrated metering and communications solutions for remote locations. The following 8 case studies of Willowglen System solutions were highlighted: (1) a SCADA system designed for the Northwest Territories Power Corporation, (2) a system of RTUs installed at the Shell Canada Ltd. Caroline Gas Complex, (3) a SCADA system designed to monitor a natural gas pipeline, (4) a SCADA system designed to monitor a transmission pipeline and distribution system in Singapore, (5) RTUs designed to monitor gas dehydration units in Bahrain, (6) a SCADA system designed for a refined petroleum products pipeline, (7) a SCADA system installed at an electric power utility in New Brunswick, and (8) a tank gauging system designed for a large oil refinery in Alberta. 7 figs.

  10. Flow whitelisting in SCADA networks

    NARCIS (Netherlands)

    Barbosa, Rafael Ramos Regis; Pras, Aiko; Sadre, Ramin

    Supervisory Control And Data Acquisition (SCADA) networks are commonly deployed to aid the operation of large industrial facilities. Modern SCADA networks are becoming more vulnerable to network attacks, due to the now common use of standard communication protocols and increased interconnection to

  11. Flow Whitelisting in SCADA Networks

    NARCIS (Netherlands)

    Barbosa, R.R.R.; Pras, Aiko; Sadre, R.

    2013-01-01

    Supervisory Control And Data Acquisition (SCADA) networks are commonly deployed to aid the operation of large industrial facilities. Modern SCADA networks are becoming more vulnerable to network attacks, due to the now common use of standard communication protocols and increased interconnection to

  12. Design Private Cloud of Oil and Gas SCADA System

    Directory of Open Access Journals (Sweden)

    Liu Miao

    2014-05-01

    Full Text Available SCADA (Supervisory Control and Data Acquisition system is computer control system based on supervisory. SCADA system is very important to oil and gas pipeline engineering. Cloud computing is fundamentally altering the expectations for how and when computing, storage and networking resources should be allocated, managed and consumed. In order to increase resource utilization, reliability and availability of oil and gas pipeline SCADA system, the SCADA system based on cloud computing is proposed in the paper. This paper introduces the system framework of SCADA system based on cloud computing and the realization details about the private cloud platform of SCADA system.

  13. Analysis of Bright Harvest Remote Analysis for Residential Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Nangle, John [National Renewable Energy Lab. (NREL), Golden, CO (United States); Simon, Joseph [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-06-17

    Bright Harvest provides remote shading analysis and design products for residential PV system installers. The National Renewable Energy Laboratory (NREL) through the NREL Commercialization Assistance Program, completed comparative assessments between on-site measurements and remotely calculated values to validate the accuracy of Bright Harvest’s remote shading and power generation.

  14. An Evaluation of Machine Learning Methods to Detect Malicious SCADA Communications

    Energy Technology Data Exchange (ETDEWEB)

    Beaver, Justin M [ORNL; Borges, Raymond Charles [ORNL; Buckner, Mark A [ORNL

    2013-01-01

    Critical infrastructure Supervisory Control and Data Acquisition (SCADA) systems were designed to operate on closed, proprietary networks where a malicious insider posed the greatest threat potential. The centralization of control and the movement towards open systems and standards has improved the efficiency of industrial control, but has also exposed legacy SCADA systems to security threats that they were not designed to mitigate. This work explores the viability of machine learning methods in detecting the new threat scenarios of command and data injection. Similar to network intrusion detection systems in the cyber security domain, the command and control communications in a critical infrastructure setting are monitored, and vetted against examples of benign and malicious command traffic, in order to identify potential attack events. Multiple learning methods are evaluated using a dataset of Remote Terminal Unit communications, which included both normal operations and instances of command and data injection attack scenarios.

  15. Access Control Management for SCADA Systems

    Science.gov (United States)

    Hong, Seng-Phil; Ahn, Gail-Joon; Xu, Wenjuan

    The information technology revolution has transformed all aspects of our society including critical infrastructures and led a significant shift from their old and disparate business models based on proprietary and legacy environments to more open and consolidated ones. Supervisory Control and Data Acquisition (SCADA) systems have been widely used not only for industrial processes but also for some experimental facilities. Due to the nature of open environments, managing SCADA systems should meet various security requirements since system administrators need to deal with a large number of entities and functions involved in critical infrastructures. In this paper, we identify necessary access control requirements in SCADA systems and articulate access control policies for the simulated SCADA systems. We also attempt to analyze and realize those requirements and policies in the context of role-based access control that is suitable for simplifying administrative tasks in large scale enterprises.

  16. SCADA system vulnerabilities to cyber attack

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, W. T. [Cyber Security Consulting (Canada)

    2004-10-01

    The susceptibility to terrorist attacks of computer-based supervisory control (SCADA) systems that are used to monitor and control water distribution systems, oil and gas pipelines and the electrical grid, is discussed. The discussion includes ways in which SCADA systems may be attacked and remedial actions that may be taken to reduce or eliminate the possibility of such attacks. Attacks may take the form of causing the system to generate false data to divert attention from impending system disasters, or commandeer the system to seriously disable it, or cause damage to the process or equipment being controlled by sending improper control commands. SCADA systems are also vulnerable to internal threats, either from an accidental action that results in damage, or an intentional action, as for example by a disgruntled employee, or ex-employee, usually by way of reprogramming an RTU or PLC by accessing the polling/communications circuit. Recent SCADA systems are much more susceptible to concerted cyber attacks because of the adoption of IT technologies and standards into the design of such systems. (Older systems are more likely to be unique designs, hence less susceptible to attack). As far as protection of SCADA systems is concerned, there are no technologies that would prevent a technologically sophisticated terrorist or disgruntled employee from doing major damage to the system, however, the IT world has developed a range of technologies for the protection of IT assets, and many of these same technologies can also be used to safeguard modern SCADA systems.

  17. Design and Implementation of SCADA Based Induction Motor Control

    OpenAIRE

    Pampashree; Dr. Md.Fakhruddin Ansari

    2014-01-01

    The introduction of Supervisory Control and Data Acquisition (SCADA) system has been discussed in details. Network components, functionality, generation and features of SCADA has been discussed in details in this paper. Application and uses of SCADA system in different fields of engineering have also been mentioned. Also the working of the software components and development in SCADA has been explained with merits and demerits of the software. Programmable Logic Controller ...

  18. Design Private Cloud of Oil and Gas SCADA System

    OpenAIRE

    Liu Miao; Mancang Yuan; Guodong Li

    2014-01-01

    SCADA (Supervisory Control and Data Acquisition) system is computer control system based on supervisory. SCADA system is very important to oil and gas pipeline engineering. Cloud computing is fundamentally altering the expectations for how and when computing, storage and networking resources should be allocated, managed and consumed. In order to increase resource utilization, reliability and availability of oil and gas pipeline SCADA system, the SCADA system based on cloud computing is propos...

  19. Rancang Bangun Sistem Scada (Supervisory Control And Data Acquisition pada Instalasi Pengolahan Air Sungai Cihideung Institut Pertanian Bogor

    Directory of Open Access Journals (Sweden)

    Agus Eko Handoko

    2017-08-01

    Full Text Available Abstract SCADA is a combination of telemetry and data acquisition. SCADA proceeding by means of accumulating some information and return back to center controlling, it is also implementing every analysis and necessary control through PID control system as a control parameter to SCADA input data system in this research. In designing PID control system it is needed the arrangement of P, I and D parameter in order to acquire output signal system to particular input system which has adjusted to necessity. The research was implemented on Water Treatment Plant in Bogor Agricultural University at Cihideung's area region. The NTU score as a starting operational data is necessary as a bench mark in PAC dose application which is obtained from the samples of morning and afternoon raw water and dose proportion is 75% for 14kgs PAC mixed with 200 Litre water within 30 NTU as the maximal treatment. 75% dose application can be imposed for 7 hours PAC usage. The result of research indicated that the variety of percentages value in PAC dose application delivered the advantage in operating of clean water processing installation particularly for PAC needed. Design Of SCADA System SCADA indicated the outcome of unit data acquirement on certain period to determine the PAC necessity in operating Water Treatment Plant.

  20. Using cyber vulnerability testing techniques to expose undocumented security vulnerabilities in DCS and SCADA equipment

    International Nuclear Information System (INIS)

    Pollet, J.

    2006-01-01

    This session starts by providing an overview of typical DCS (Distributed Control Systems) and SCADA (Supervisory Control and Data Acquisition) architectures, and exposes cyber security vulnerabilities that vendors never admit, but are found through a comprehensive cyber testing process. A complete assessment process involves testing all of the layers and components of a SCADA or DCS environment, from the perimeter firewall all the way down to the end devices controlling the process, including what to look for when conducting a vulnerability assessment of real-time control systems. The following systems are discussed: 1. Perimeter (isolation from corporate IT or other non-critical networks) 2. Remote Access (third Party access into SCADA or DCS networks) 3. Network Architecture (switch, router, firewalls, access controls, network design) 4. Network Traffic Analysis (what is running on the network) 5. Host Operating Systems Hardening 6. Applications (how they communicate with other applications and end devices) 7. End Device Testing (PLCs, RTUs, DCS Controllers, Smart Transmitters) a. System Discovery b. Functional Discovery c. Attack Methodology i. DoS Tests (at what point does the device fail) ii. Malformed Packet Tests (packets that can cause equipment failure) iii. Session Hijacking (do anything that the operator can do) iv. Packet Injection (code and inject your own SCADA commands) v. Protocol Exploitation (Protocol Reverse Engineering / Fuzzing) This paper will provide information compiled from over five years of conducting cyber security testing on control systems hardware, software, and systems. (authors)

  1. Using cyber vulnerability testing techniques to expose undocumented security vulnerabilities in DCS and SCADA equipment

    Energy Technology Data Exchange (ETDEWEB)

    Pollet, J. [PlantData Technologies, Inc., 1201 Louisiana Street, Houston, TX 77002 (United States)

    2006-07-01

    This session starts by providing an overview of typical DCS (Distributed Control Systems) and SCADA (Supervisory Control and Data Acquisition) architectures, and exposes cyber security vulnerabilities that vendors never admit, but are found through a comprehensive cyber testing process. A complete assessment process involves testing all of the layers and components of a SCADA or DCS environment, from the perimeter firewall all the way down to the end devices controlling the process, including what to look for when conducting a vulnerability assessment of real-time control systems. The following systems are discussed: 1. Perimeter (isolation from corporate IT or other non-critical networks) 2. Remote Access (third Party access into SCADA or DCS networks) 3. Network Architecture (switch, router, firewalls, access controls, network design) 4. Network Traffic Analysis (what is running on the network) 5. Host Operating Systems Hardening 6. Applications (how they communicate with other applications and end devices) 7. End Device Testing (PLCs, RTUs, DCS Controllers, Smart Transmitters) a. System Discovery b. Functional Discovery c. Attack Methodology i. DoS Tests (at what point does the device fail) ii. Malformed Packet Tests (packets that can cause equipment failure) iii. Session Hijacking (do anything that the operator can do) iv. Packet Injection (code and inject your own SCADA commands) v. Protocol Exploitation (Protocol Reverse Engineering / Fuzzing) This paper will provide information compiled from over five years of conducting cyber security testing on control systems hardware, software, and systems. (authors)

  2. What's under the hood? Improving SCADA security with process awareness

    NARCIS (Netherlands)

    Chromik, Justyna Joanna; Remke, Anne Katharina Ingrid; Haverkort, Boudewijn R.H.M.

    2016-01-01

    SCADA networks are an essential part of monitoring and controlling physical infrastructures, such as the power grid. Recent news item show that tampering with the data exchanged in a SCADA network occurs and has severe consequences. A possible way of improving the security of SCADA networks is to

  3. SCADA for microtron and beam transport line radio therapy machine subsystem

    International Nuclear Information System (INIS)

    Deshpande, Praveen; Palod, Shradha; Bhujle, Ashok

    2003-01-01

    Centre for Advanced Technology is developing a Radio Therapy Machine (RTM) to be used for cancer treatment. The radiotherapy machine has a Microtron consisting of a RF system, main and auxiliary magnets. It has a Beam transport line (BTL) consisting of fourteen magnets. This paper describes a PC based supervisory control and data acquisition system (SCADA) developed for controlling mainly the power supplies for the above sub systems from a remote location. It offers a graphic user interface (GUI) at the control room PC for RTM operation in engineering mode

  4. Perancangan Sistem Pemantauan Pengendali Suhu pada Stirred Tank Heater menggunakan Supervisory Control and Data Acquisition (SCADA

    Directory of Open Access Journals (Sweden)

    Ike Bayusari

    2013-04-01

    Full Text Available This paper discusses design of a suhue control monitoring system in stirred tank heater system that has an important function in industrial processes. Monitoring of suhue control system in stirred tank heater is designed using Supervisory Control and Data Acquisition (SCADA that control function of industrial processes. While the actuator to be controlled is the position of burner openings, so that the heat can be adjusted to meet a predetermined set-point. The suhue controller that is also used as a Remote Terminal Unit (RTU is Programmable Logic Controller (PLC. The testing result showed on SCADA system was quite good, where the average percentage of deviation for testing of set-point data was 0.76687%, and the percentage of deviation for testing of suhue data was 0.082%.

  5. An Efficient Approach of Load Shifting by Using SCADA

    Directory of Open Access Journals (Sweden)

    Usman Sohail

    2016-08-01

    Full Text Available The consumption of electric power has increased significantly in the past few years, and its demand is still increasing every day. In this regard, its proper distribution is a significant challenge. This paper includes a method not only to improve the existing power distribution by using SCADA but also to reduce the human errors from the system by making the system automated. As a prototype for this paper, a geographical area was divided in to three regions named as A-Islamabad, B-Rawalpindi and C-Attock. These three regions were used as the Remote Terminal Units RTU’s and were further divided into four sectors based on different types of consumers. One main control unit was set to handle the whole power system which was referred to as the MTU (master terminal unit. MTU was designed in such a way that not only it was capable to show RTU’s readings on Graphical user interface-GUI but also to control them. By establishing such a design, distribution of electric power based on priority was achieved among these regions and thus the load requirements were managed by means of priorities among them. The entire load management task was supervised by an individual who was authorized to control the MTU’s GUI. SCADA system enabled the MTU to regulate the electric power in regions and their sectors. All the RTU’s were connected with the MTU by means of a wireless network based on an Internet Service Provider (ISP. If the system works accordingly, the MTU would be able to access the RTU’s from any part of the world. SCADA provides a platform to manage the overall system with the minimal manpower; hence, the human errors were reduced.

  6. Whitelists Based Multiple Filtering Techniques in SCADA Sensor Networks

    Directory of Open Access Journals (Sweden)

    DongHo Kang

    2014-01-01

    Full Text Available Internet of Things (IoT consists of several tiny devices connected together to form a collaborative computing environment. Recently IoT technologies begin to merge with supervisory control and data acquisition (SCADA sensor networks to more efficiently gather and analyze real-time data from sensors in industrial environments. But SCADA sensor networks are becoming more and more vulnerable to cyber-attacks due to increased connectivity. To safely adopt IoT technologies in the SCADA environments, it is important to improve the security of SCADA sensor networks. In this paper we propose a multiple filtering technique based on whitelists to detect illegitimate packets. Our proposed system detects the traffic of network and application protocol attacks with a set of whitelists collected from normal traffic.

  7. Enlace de reconectadores a un sistema SCADA mediante una red de comunicaciones

    Directory of Open Access Journals (Sweden)

    Juan Ortega Castro

    2016-12-01

    Abstract The following paper details the link methodology from a communications network for the SCADA system at Azogues Power Company (EEA, starting from the need to implement electric reconnectors in the short and medium term; using automatic reconnectors OSM for their versatility and endurance when used outdoors, IEC 870 DNP3 communications protocols and ModBus for SCADA systems and remote terminal units. This way there is an improvement in the quality of the power supply service that is distributed in Azogues and its parishes. For this task, an implementation design of a communications network was done, in order to link the new reconnectors that were acquired by the company; setting a priority of the infrastructure and resources that it already had, achieving the placement of eight of these devices that were distributed in different areas of the city, using optic fiber in some cases and radio links in other situations when the network infrastructure didn’t allow the physical access to the facility; everything backed up with the correspondent technical and financial studies

  8. SCADA system for islanded DC microgrids

    DEFF Research Database (Denmark)

    Xiao, Zhao xia; Zhijun, Guo; Guerrero, Josep M.

    2017-01-01

    intelligent modules and different communication techniques. The developed SCADA system can monitor real-time parameters such as voltages, currents, or powers, and can store the important parameters into the database. Users can get historical data realistically and effectively through SQL access. When some...... the action of the slaves. This way, it implements the combination of required monitoring and control functions. The SCADA system includes an energy management system (EMS), monitoring of state of charge (SOC) of the battery management system (BMS), and black start operation. The system is in operation...... values in the system exceed or fall below the predetermine limits, the SCADA system can pop up the alarm screen, give an alert and send a text message or call an specified person via an SMS module. The host not only can monitor the operation status of the system, but also give orders to control...

  9. Handbook of SCADA/control systems security

    CERN Document Server

    Radvanovsky, Robert

    2013-01-01

    The availability and security of many services we rely upon-including water treatment, electricity, healthcare, transportation, and financial transactions-are routinely put at risk by cyber threats. The Handbook of SCADA/Control Systems Security is a fundamental outline of security concepts, methodologies, and relevant information pertaining to the supervisory control and data acquisition (SCADA) systems and technology that quietly operate in the background of critical utility and industrial facilities worldwide. Divided into five sections, the book examines topics comprising functions within

  10. Is the CERN recommended SCADA useable for the ST division?

    CERN Document Server

    Sollander, P; Epting, U

    2001-01-01

    Supervisory Control and Data Acquisition (SCADA) systems are widely used at CERN and in industrial control environments. In order to limit the costs of purchase, maintenance and support, a recommendation for one SCADA system is in preparation by the SCADA working group. This SCADA system should be used for all CERN in-house developed applications as they exist today e.g. in the Technical Control Room (TCR). This presentation will show the actual environment for the control and monitoring of the technical infrastructure at CERN and the needs for the future LHC infrastructure monitoring. The presentation will cover the control activities of all ST groups represented in the ST Control System WG. A possible solution for the integration of the technical infrastructure data into a SCADA system and a solution for the data exchange with the accelerators and the experiments will be presented. This includes a short term planning for the evaluation period as well as the long-term strategy on how to implement the chosen ...

  11. Remote Supervision and Control of Air Conditioning Systems in Different Modes

    Science.gov (United States)

    Rafeeq, Mohammed; Afzal, Asif; Rajendra, Sree

    2018-01-01

    In the era of automation, most of the application of engineering and science are interrelated with system for optimal operation. To get the efficient result of an operation and desired response, interconnected systems should be controlled by directing, regulating and commanding. Here, air conditioning (AC) system is considered for experimentation, to supervise and control its functioning in both, automated and manual mode. This paper reports the work intended to design and develop an automated and manual AC system working in remote and local mode, to increase the level of comfort, easy operation, reducing human intervention and faults occurring in the system. The Programmable Logical Controller (PLC) and Supervisory Control and Data Acquisition (SCADA) system were used for remote supervision and monitoring of AC systems using series ninety protocol and remote terminal unit modbus protocol as communication module to operate in remote mode. PLC was used as remote terminal for continuous supervision and control of AC system. SCADA software was used as a tool for designing user friendly graphical user interface. The proposed SCADA AC system successfully monitors and controls in accordance within the parameter limits like temperature, pressure, humidity and voltage. With all the features, this designed system is capable of efficient handling of the resources like the compressor, humidifier etc., with all the levels of safety and durability. This system also maintains the temperature and controls the humidity of the remote location and also looks after the health of the compressor.

  12. Modernization Of Electrical Installation By Using Wireless Remote Control

    Directory of Open Access Journals (Sweden)

    Mawlood M Al – Hamad

    2013-05-01

    Full Text Available Great benefits can be achieved by using wireless remote control in electrical wiring systems of buildings.     Probably the main advantage of this application is the drastic saving in wiring installations, which in turn will give higher reliability, safety and economy.     The idea of this application can be summarized in the following explanation. '' Instead off connecting each point of electrical system to individual switch by wires, a remote receiver can be situated in a place near to the point. The transmitter is used to operate the point remotely. The mains are connected to the receiver which will connect or disconnect the load as required. Many points can be connected to one receiver and can be operated by one or more transmitter.

  13. A Log Mining Approach for Process Monitoring in SCADA

    NARCIS (Netherlands)

    Hadziosmanovic, D.; Bolzoni, D.; Hartel, Pieter H.

    2012-01-01

    SCADA (Supervisory Control and Data Acquisition) systems are used for controlling and monitoring industrial processes. We propose a methodology to systematically identify potential process-related threats in SCADA. Process-related threats take place when an attacker gains user access rights and

  14. A Log Mining Approach for Process Monitoring in SCADA

    NARCIS (Netherlands)

    Hadziosmanovic, D.; Bolzoni, D.; Hartel, Pieter H.

    2010-01-01

    SCADA (Supervisory Control and Data Acquisition) systems are used for controlling and monitoring industrial processes. We propose a methodology to systematically identify potential process-related threats in SCADA. Process-related threats take place when an attacker gains user access rights and

  15. Susceptibility of SCADA systems and the energy sector

    Science.gov (United States)

    Goike, Lindsay

    The research in this paper focused on analyzing SCADA systems in the energy sector for susceptibility to cyber attacks, in furtherance of providing suggestions to mitigate current and future cyber attacks. The research will be addressing the questions: how are SCADA systems susceptible to cyber attacks, and what are the suggested ways to mitigate both current and future cyber attacks. The five main categories of security vulnerabilities facing current SCADA systems were found to be: connectivity to the Internet, failure to plan, interdependency of sectors, numerous different types of threats, and outdated software. Some of the recommendations mentioned to mitigate current and future risks were: virtual private networks, risk assessments, increased physical security, updating of software, and firewalls.

  16. SCADA AND SECURITY DISPATCHES ACCORDING TO PRESENT LEGISLATION IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Cristian Silviu BANACU

    2014-11-01

    Full Text Available SCADA is an old term, older than twenty years, used for defining systems that acquires data from industrial networks and / or critical infrastructure networks and process them for operational and security purposes. Its importance is growing simultaneously with the development of technology’s interference in our lives (social life, economical life, etc.. Although they are not defined as SCADA systems, Security dispatches (and their structure have a lot of similarities with the general architecture of SCADA systems. Taking into consideration the security dispatches, as they are accepted by the actual Romanian law, we will draw a parallel between them and SCADA architecture, identifying the similarities and the differences between them, and also the points where some changes could be made.

  17. What's under the hood? Improving SCADA security with process awareness

    OpenAIRE

    Chromik, Justyna Joanna; Remke, Anne Katharina Ingrid; Haverkort, Boudewijn R.H.M.

    2016-01-01

    SCADA networks are an essential part of monitoring and controlling physical infrastructures, such as the power grid. Recent news item show that tampering with the data exchanged in a SCADA network occurs and has severe consequences. A possible way of improving the security of SCADA networks is to use intrusion detection systems. By monitoring and analysing the traffic, it is possible to detect whether information has a legitimate source or was tampered with. However, in many cases the knowled...

  18. Design and implementation of HMI and SCADA applied to a didactic emulation of a packing process

    Directory of Open Access Journals (Sweden)

    Manuel Alejandro Bohórquez-Dallos

    2013-07-01

    The supervision and control of the signals are performed with the CANopen protocol. The developed system allows the user to interact directly with the emulation of the process, triggering elements of it in the computer remotely and locally using the touch screen. The SCADA and HMI are embedded in a CoDeSys® function that the user can use as a learning tool for automating the process emulation.

  19. Development of Supervisory Control and Data Acquisition (SCADA) Electrical Supply in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Zainudin Jaafar; Mohd Ashhar Khalid; Mohd Hanafiah Chik

    2015-01-01

    Nuclear Power supplies in Malaysia supplied from the power utility company Tenaga Nasional Berhad through several substations before reaching the building and equipment. The power supply is received and passed down through the 11000 V high voltage switch gears to 415 V 3-phase or 1-phase 240 V. The equipment used in this process is dangerous and monitoring hardware operating remotely (remote) is the best as only guard machinery may engage in business operations. Similarly, the supply of electrical parameters should be monitored to ensure safe and continuous supply of and according to the appropriate voltage for record and analysis when needed. This paper discusses the monitoring and data acquisition is performed using the system 'Supervisory Control And Data Acquisition (SCADA) was developed. (author)

  20. Resilient Control and Intrusion Detection for SCADA Systems

    Science.gov (United States)

    2014-05-01

    Lowe. The myths and facts behind cyber security risks for industrial control systems . VDE Congress, 2004. [45] I. S. C37.1-1994. Ieee standard...Resilient Control and Intrusion Detection for SCADA Systems Bonnie Xia Zhu Electrical Engineering and Computer Sciences University of California at...3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE Resilient Control and Intrusion Detection for SCADA Systems 5a. CONTRACT

  1. Application of Functional Analysis on a SCADA System of a Thermal Power Plant

    Directory of Open Access Journals (Sweden)

    LAKHOUA, M. N.

    2009-06-01

    Full Text Available The aim of this paper is to present firstly the functionality of a supervisory system for complex processes, and secondly to present the concepts of SCADA (supervisory control and data acquisition systems. A functional analysis technique SADT (Structured Analysis and Design Technique has been applied on an example of a SCADA system of a thermal power plant. This technique allows a functional description of a SCADA system. The paper briefly discusses the functions of a SCADA system and some advantages of the application of functional analysis for the design of a human centered supervisory system. Then the basic principles of the SADT technique applied on the SCADA system are presented. Finally, the different results obtained from the SADT technique are discussed.

  2. Review of Supervisory Control and Data Acquisition (SCADA) Systems

    Energy Technology Data Exchange (ETDEWEB)

    Reva Nickelson; Briam Johnson; Ken Barnes

    2004-01-01

    A review using open source information was performed to obtain data related to Supervisory Control and Data Acquisition (SCADA) systems used to supervise and control domestic electric power generation, transmission, and distribution. This report provides the technical details for the types of systems used, system disposal, cyber and physical security measures, network connections, and a gap analysis of SCADA security holes.

  3. Analysis of a SCADA System Anomaly Detection Model Based on Information Entropy

    Science.gov (United States)

    2014-03-27

    Gerard, 2005:3) The NTSB report lists alarm management as one of the top five areas for improvement in pipeline SCADA systems (Gerard, 2005:1...Zhang, Qin, Wang, and Liang for leak detection in a SCADA -run pipeline system. A concept derived from information theory improved leak detection...System for West Products Pipeline . Journal of Loss Prevention in the Process Industries, 22(6), 981-989. Zhu, B., & Sastry, S. (2010). SCADA

  4. Production Facility SCADA Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Dale, Gregory E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Holloway, Michael Andrew [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baily, Scott A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Woloshun, Keith Albert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wheat, Robert Mitchell Jr. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    The following report covers FY 14 activities to develop supervisory control and data acquisition (SCADA) system for the Northstar Moly99 production facility. The goal of this effort is to provide Northstar with a baseline system design.

  5. Solution for remote handling in accelerator installations

    International Nuclear Information System (INIS)

    Burgerjon, J.J.; Ekberg, E.L.; Grisham, D.L.; Horne, R.A.; Meyer, R.E.; Flatau, C.R.; Wilson, K.B.

    1977-01-01

    A description is given of a remote-handling system designed for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF), versatile enough to be used in a variety of situations found around particle accelerators. The system consists of a bilateral (force-reflecting) servomanipulator installed on an articulated hydraulic boom. The boom also carries the necessary tools and observation devices. The whole slave unit can be moved by crane or truck to the area of operation. A control cable connects the slave unit with the control station, located at a safe distance in a trailer. Various stages of development as well as some operating experience are discussed

  6. Comparison between commercial and open-source SCADA packages-A case study

    International Nuclear Information System (INIS)

    Barana, O.; Barbato, P.; Breda, M.; Capobianco, R.; Luchetta, A.; Molon, F.; Moressa, M.; Simionato, P.; Taliercio, C.; Zampiva, E.

    2010-01-01

    SPIDER (Source for the Production of Ions of Deuterium Extracted from Rf plasma) is a new experimental device under development at Consorzio RFX aimed at providing a full-scale ion source prototype for MITICA (Megavolt ITer Injector and Concept Advance), the experiment devoted at supplying a full-scale prototype of the ITER Heating Neutral Beam Injector (HNB). Both experimental devices will be hosted in a new facility known as PRIMA (Padova Research on Injectors Megavolt Accelerated). The correct operation of SPIDER and MITICA will be guaranteed by process automation and plant monitoring that will be implemented using suitable controllers (cycle time greater than 10 ms) in conjunction with appropriate SCADA (Supervisory Control And Data Acquisition) software. This paper presents the tests performed at Consorzio RFX to evaluate commercial and open-source SCADA packages and prepare a technical base for the selection of the SCADA system for SPIDER. Two commercial solutions and two open-source solutions (EPICS and TANGO) were investigated. The typical test-bed was represented by a SCADA system exchanging data with a PLC (Programmable Logic Controller). The case study consisted of: (a) the development of a minimal panel provided with fields for setting parameters and of a trend window; (b) the set-up of two kinds of communication, a direct connection between the SCADA and the PLC and an indirect one by means of an OPC (Object Linking and Embedding for Process Control) server. The communication performance was evaluated measuring the network traffic with a fixed number of data variables exchanged and different polling cycle times. The conclusions show that the final choice of a SCADA package for SPIDER will be between one commercial SCADA and EPICS. This choice will not depend uniquely on the results of the tests, but will be also dictated by the early schedule of the SPIDER operations.

  7. Upgradation in SCADA and PLC of existing LN_2 control system for SST-1

    International Nuclear Information System (INIS)

    Panchal, Pradip; Mahesuria, Gaurang; Panchal, Rohit; Patel, Rakesh; Sonara, Dashrath; Pitroda, Dipen; Nimavat, Hiren; Tanna, Vipul; Pradhan, Subrata

    2016-01-01

    Highlights: • The control system of LN_2 Management System of SST-1 is designed on PLC and SCADA. • The implementation and results of up-gradation in PLC and SCADA are reported. • The up-gradation in PLC and SCADA has improved the reliability & availability of SST-1 LN_2 system. - Abstract: Helium Refrigerator/Liquefier system of Steady State Superconducting Tokamak (SST-1) incorporates Liquid Nitrogen (LN_2) pre-cooling system. LN_2 is used for 80 K thermal shields of SST-1, current feeder system and integrated flow distribution and control system. The LN_2 management system is distributed system and requires automatic control. Initially LN_2 control system had Citect based Supervisory Control and Data Acquisition (SCADA) and Koyo make Programmable Logic Controller (PLC). With the passage of time and due to unavailability of their hardware, it is being obsoleted. So, the requirements of new PLC and SCADA systems have been envisaged to make uninterruptable operation of SST-1 cryogenic system. Therefore, Wonderware SCADA and Schneider Electric make PLC is programmed to replace Citect SCADA and Koyo PLC. New control features have been added in upgraded control system for better management of LN_2 system. This upgradation of SCADA and PLC is completed, tested successfully and in operation. Operational performance highlights of the new upgraded system are presented in this paper.

  8. Cybersecurity for industrial control systems SCADA, DCS, PLC, HMI, and SIS

    CERN Document Server

    Macaulay, Tyson

    2011-01-01

    SCADA - Supervisory Control and Data Acquisition - Systems don't necessarily mesh well with standard IT security, although combined the two can create deepened levels of protection. This book demonstrates how to develop a SCADA cyber security program and how to work with internal and external IT resources in order to implement it. The technical level of this text ensures that it does not provide a detailed 'cookbook' that can be used to attack SCADA systems, but the text still provides sufficient technical detail to address areas of concern.

  9. A SCADA System for Energy Management in Intelligent Buildings

    OpenAIRE

    Figueiredo, Joao; Sá da Costa, Jose

    2012-01-01

    This paper develops an energy management platform for intelligent buildings using a SCADA system (Supervisory Control And Data Acquisition). This SCADA system integrates different types of information coming from the several technologies present in modern buildings (control of ventilation, temperature, illumination, etc.). The developed control strategy implements an hierarchical cascade controller where inner loops are performed by local PLCs (Programmable Logic Controller), and the outer...

  10. Scada Systems – Control, Supervision and Data Acquisition for the Power Plants Settled on a Stream (Part 2

    Directory of Open Access Journals (Sweden)

    Cosmin Ursoniu

    2015-09-01

    Full Text Available Scada (supervisory control and data acquisition is a complex system that supervises and controls an industrial process and performs several functions. A human machine interface will also be presented and how the process in a power plant is controlled and supervised through it by the operator. The main screen will be described (which is a global view of the hydro unit and what the operator can see and what he can press to control the power plants process also a few more screens will be presented for auxiliary installations and it will be described what the operator can see and what he can do to control the installation.

  11. Scada Systems – Control, Supervision and Data Acquisition for the Power Plants Settled on a Stream (Part 1

    Directory of Open Access Journals (Sweden)

    Cosmin Ursoniu

    2015-09-01

    Full Text Available Scada (supervisory control and data acquisition is a complex system that supervises and control an industrial process and performs several functions. A human machine interface will also be presented and how the process in a power plant is controlled and supervised through it by the operator. The main screen will be described (which is a global view of the hydro unit and what the operator can see and what he can press to control the power plants process also a few more screens will be presented for auxiliary installations and it will be described what the operator can see and what he can do to control the installation.

  12. Factors affecting remote handling productivity during installation of the ITER-like wall at JET

    International Nuclear Information System (INIS)

    Collins, S.; Matthews, G.; Thomas, J.; Hermon, G.

    2013-01-01

    Highlights: ► The paper describes the challenges to achieve the installation of the ILW beryllium sliced wall. ► Examines the factual difference between estimated remote handling in-vessel durations and those achieved, with a view to quantifying the typical disparity between the two. ► The paper will elaborate and highlight the contributing factors. This offers an opportunity to provide provenance for availability estimates of devices such as ITER and DEMO. ► The paper will identify and describe the factors influencing the ratio between estimated versus the actual durations for remote handling operations. -- Abstract: Remote handling operations at JET have encountered many challenges to achieve the installation of the ILW beryllium sliced wall during the Enhanced Performance stage 2 (EP2) shutdown of JET. This was a demanding and challenging activity which was based on the experience gained from a period of over 15 years (20,000 h operations) of JET In-Vessel remote handling operations. This paper describes the difference between estimated remote handling in-vessel durations and those actually achieved with a view to quantifying the typical disparity between them. There are many factors that affect productivity of the remote handling operations and it is important to accommodate these either in the design of the component or within the production of the operational procedures with a view to minimise all impact on the final task duration. Some factors that affect the efficiency are outside the control of the design and operational procedures. These are unforeseen anomalies that were encountered during the removal, naked wall survey and installation of the components. Recoveries from these anomalies are extremely challenging and need to be addressed efficiently in order to minimise the impact on the shutdown duration and prevent optimised panned activities from becoming inefficient by fragmentation

  13. Cyber Security in Industrial Control Systems and SCADA Applications: Modbus TCP Protocol Example

    Directory of Open Access Journals (Sweden)

    Erdal IRMAK

    2017-12-01

    Full Text Available Electrical energy generation, transmission and distribution systems are evaluated in terms of national security dimension and defined as critical infrastructures. Monitoring and controlling of these systems is provided by Industrial Control Systems (ICS or Supervisory Control and Data Acquisition (SCADA systems. According to the latest advances in communication and internet technology, ICS/SCADA systems have started to become integrated with these systems. As a result of this situation, current or existing vulnerabilities in information and communication technology affect to SCADA systems directly. Therefore, this paper focuses on the cyber security of ICS/SCADA systems. It has been proved that the lack of authentication detected in Modbus TCP protocol, one of the most used in ICS/SCADA systems, can be exploited. In order to solve this security issue, a software is developed using the Python programming language for blocking or mitigating the cyber attacks. The proposed solution is subjected to several tests and results show that the attacks can be prevented successfully. Thus, it is considered that the proposed work will contribute to the security of ICS/SCADA systems and the industrial protocols using for communicating these systems.

  14. Intrusion Detection in SCADA Networks

    NARCIS (Netherlands)

    Barbosa, R.R.R.; Pras, Aiko; Stiller, Burckhard; De Turck, Filip

    Supervisory Control and Data Acquisition (SCADA) sys- tems are a critical part of large industrial facilities, such as water dis- tribution infrastructures. With the goal of reducing costs and increas- ing efficiency, these systems are becoming increasingly interconnected. However, this has also

  15. Modeling of quasi-static thrust load of wind turbines based on 1 s SCADA data

    Directory of Open Access Journals (Sweden)

    N. Noppe

    2018-03-01

    Full Text Available A reliable load history is crucial for a fatigue assessment of wind turbines. However, installing strain sensors on every wind turbine is not economically feasible. In this paper, a technique is proposed to reconstruct the thrust load history of a wind turbine based on high-frequency Supervisory Control and Data Acquisition (SCADA data. Strain measurements recorded during a short period of time are used to train a neural network. The selection of appropriate input parameters is performed based on Pearson correlation and mutual information. Once the training is done, the model can be used to predict the thrust load based on SCADA data only. The technique is validated on two different datasets, one consisting of simulation data (using the software FAST v8, created by Jonkman and Jonkman, 2016 obtained in a controllable environment and one consisting of measurements taken at an offshore wind turbine. In general, the relative error between simulated or measured and predicted thrust load barely exceeds 15 % during normal operation.

  16. Flow whitelisting in SCADA networks

    DEFF Research Database (Denmark)

    Barbosa, Rafael Ramos Regis; Sadre, Ramin; Pras, Aiko

    2013-01-01

    and the Internet. This paper describes an approach for improving the security of SCADA networks using flow whitelisting. A flow whitelist describes legitimate traffic based on four properties of network packets: client address, server address, server-side port and transport protocol. The proposed approach...

  17. Evaluation of Anomaly Detection Techniques for SCADA Communication Resilience

    OpenAIRE

    Shirazi, Syed Noor Ul Hassan; Gouglidis, Antonios; Syeda, Kanza Noor; Simpson, Steven; Mauthe, Andreas Ulrich; Stephanakis, Ioannis M.; Hutchison, David

    2016-01-01

    Attacks on critical infrastructures’ Supervisory Control and Data Acquisition (SCADA) systems are beginning to increase. They are often initiated by highly skilled attackers, who are capable of deploying sophisticated attacks to exfiltrate data or even to cause physical damage. In this paper, we rehearse the rationale for protecting against cyber attacks and evaluate a set of Anomaly Detection (AD) techniques in detecting attacks by analysing traffic captured in a SCADA network. For this purp...

  18. Upgradation in SCADA and PLC of existing LN{sub 2} control system for SST-1

    Energy Technology Data Exchange (ETDEWEB)

    Panchal, Pradip, E-mail: pradip@ipr.res.in; Mahesuria, Gaurang; Panchal, Rohit; Patel, Rakesh; Sonara, Dashrath; Pitroda, Dipen; Nimavat, Hiren; Tanna, Vipul; Pradhan, Subrata

    2016-11-15

    Highlights: • The control system of LN{sub 2} Management System of SST-1 is designed on PLC and SCADA. • The implementation and results of up-gradation in PLC and SCADA are reported. • The up-gradation in PLC and SCADA has improved the reliability & availability of SST-1 LN{sub 2} system. - Abstract: Helium Refrigerator/Liquefier system of Steady State Superconducting Tokamak (SST-1) incorporates Liquid Nitrogen (LN{sub 2}) pre-cooling system. LN{sub 2} is used for 80 K thermal shields of SST-1, current feeder system and integrated flow distribution and control system. The LN{sub 2} management system is distributed system and requires automatic control. Initially LN{sub 2} control system had Citect based Supervisory Control and Data Acquisition (SCADA) and Koyo make Programmable Logic Controller (PLC). With the passage of time and due to unavailability of their hardware, it is being obsoleted. So, the requirements of new PLC and SCADA systems have been envisaged to make uninterruptable operation of SST-1 cryogenic system. Therefore, Wonderware SCADA and Schneider Electric make PLC is programmed to replace Citect SCADA and Koyo PLC. New control features have been added in upgraded control system for better management of LN{sub 2} system. This upgradation of SCADA and PLC is completed, tested successfully and in operation. Operational performance highlights of the new upgraded system are presented in this paper.

  19. Attacks and intrusion detection in wireless sensor networks of industrial SCADA systems

    Science.gov (United States)

    Kamaev, V. A.; Finogeev, A. G.; Finogeev, A. A.; Parygin, D. S.

    2017-01-01

    The effectiveness of automated process control systems (APCS) and supervisory control and data acquisition systems (SCADA) information security depends on the applied protection technologies of transport environment data transmission components. This article investigates the problems of detecting attacks in wireless sensor networks (WSN) of SCADA systems. As a result of analytical studies, the authors developed the detailed classification of external attacks and intrusion detection in sensor networks and brought a detailed description of attacking impacts on components of SCADA systems in accordance with the selected directions of attacks.

  20. Research and Application of a SCADA System for a Microgrid

    Directory of Open Access Journals (Sweden)

    Shuangshuang Li

    2017-03-01

    Full Text Available An effective Supervisory Control and Data Acquisition (SCADA system can improve the reliability, safety and economic benefits of a microgrid operation. In this research, the lower central controller and upper WEB (World Wide Web monitoring system are connected by the SCADA system, which is the hub of a microgrid intelligent monitoring platform. This system contains a set of specific functions programmed by Java as a middleware and can provide communication and control functions between the central controller and the upper monitoring system. For the sake of security and stability of the microgrid, the SCADA system realizes business processing on real-time data acquisition and storage, load balancing and resource recovery, concurrent security processing, and control instruction parsing and transmission. All those functions were tested and verified in actual operation.

  1. Design of virtual SCADA simulation system for pressurized water reactor

    International Nuclear Information System (INIS)

    Wijaksono, Umar; Abdullah, Ade Gafar; Hakim, Dadang Lukman

    2016-01-01

    The Virtual SCADA system is a software-based Human-Machine Interface that can visualize the process of a plant. This paper described the results of the virtual SCADA system design that aims to recognize the principle of the Nuclear Power Plant type Pressurized Water Reactor. This simulation uses technical data of the Nuclear Power Plant Unit Olkiluoto 3 in Finland. This device was developed using Wonderware Intouch, which is equipped with manual books for each component, animation links, alarm systems, real time and historical trending, and security system. The results showed that in general this device can demonstrate clearly the principles of energy flow and energy conversion processes in Pressurized Water Reactors. This virtual SCADA simulation system can be used as instructional media to recognize the principle of Pressurized Water Reactor

  2. Design of virtual SCADA simulation system for pressurized water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Wijaksono, Umar, E-mail: umar.wijaksono@student.upi.edu; Abdullah, Ade Gafar; Hakim, Dadang Lukman [Electrical Power System Research Group, Department of Electrical Engineering Education, Jl. Dr. Setiabudi No. 207 Bandung, Indonesia 40154 (Indonesia)

    2016-02-08

    The Virtual SCADA system is a software-based Human-Machine Interface that can visualize the process of a plant. This paper described the results of the virtual SCADA system design that aims to recognize the principle of the Nuclear Power Plant type Pressurized Water Reactor. This simulation uses technical data of the Nuclear Power Plant Unit Olkiluoto 3 in Finland. This device was developed using Wonderware Intouch, which is equipped with manual books for each component, animation links, alarm systems, real time and historical trending, and security system. The results showed that in general this device can demonstrate clearly the principles of energy flow and energy conversion processes in Pressurized Water Reactors. This virtual SCADA simulation system can be used as instructional media to recognize the principle of Pressurized Water Reactor.

  3. Analysis of Anholt offshore wind farm SCADA measurements

    DEFF Research Database (Denmark)

    Hansen, Kurt Schaldemose; Volker, Patrick; Pena Diaz, Alfredo

    SCADA measurements from the Danish Anholt offshore wind farm (ANH) for a period of 2½ years have been qualified. ANH covers 12 km × 22 km and is located between Djursland and the island Anholt in Kattegat, Denmark. This qualification encompasses identification of curtailment and idling periods......, start/stop events and a power curve control for each wind turbine in the wind farm. Data also include wind speed measurements from a nearby WindCube lidar and simulations from the WRF model for the same period as the SCADA. An equivalent wind speed (wsi) is derived from the combined power and pitch...

  4. MultiController: the PLC-SCADA object for advanced regulation

    CERN Document Server

    Ortola, J

    2007-01-01

    Nowadays, industrial solutions with PLCs (Programmable Logic Controllers) have basic control loop features. The SCADA (Supervisory Control And Data Acquisition) system is a key point of the process control system due to an efficient HMI (Human Machine Interfaces) that provides an open method of tuning and leading possibilities. As a consequence, advanced control algorithms have to be developed and implemented for those PLC-SCADA solutions in order to provide perspectives in solving complex and critical regulation problems. The MultiController is an object integrated for a large scale project at CERN (the European Organization for Nuclear Research) named LHC-GCS (Large Hadron Collider - Gas Control System). It is developed for a Framework called CERN-UNICOS based on PLC-SCADA facilities. The MultiController object offers various advanced control loop strategies. It gives to the user advanced control algorithms like PID, Smith Predictor, PFC, GPC and RST. It is implemented as a monolithic entity (in PLC and SCA...

  5. Creating a European SCADA Security Testbed

    NARCIS (Netherlands)

    Christiansson, H.; Luiijf, H.A.M.

    2008-01-01

    Supervisory control and data acquisition (SCADA) systems are commonly used to monitor and control critical infrastructure assets. However, over the past two decades, they have evolved from closed, proprietary systems to open networks comprising commodity platforms running common operating systems

  6. SISTEMA SCADA PARA EL PROCESO DE PASTEURIZACION DE JUGOS

    Directory of Open Access Journals (Sweden)

    Juan de Dios Contreras Cáceres

    2014-06-01

    Full Text Available La finalidad de este artículo es dar a conocer el proyecto desarrollado para diseñar e implementar un sistema SCADA (Supervisory Control And Data Adquisition aplicado al proceso de pasteurización de jugos. Se siguieron las etapas de diseño, partiendo de la elaboración del esquemático Layout, la programación del PLC, los drivers de comunicación y el diseño del software SCADA para una planta de jugos.

  7. CDP - Adaptive Supervisory Control and Data Acquisition (SCADA) Technology for Infrastructure Protection

    Energy Technology Data Exchange (ETDEWEB)

    Marco Carvalho; Richard Ford

    2012-05-14

    Supervisory Control and Data Acquisition (SCADA) Systems are a type of Industrial Control System characterized by the centralized (or hierarchical) monitoring and control of geographically dispersed assets. SCADA systems combine acquisition and network components to provide data gathering, transmission, and visualization for centralized monitoring and control. However these integrated capabilities, especially when built over legacy systems and protocols, generally result in vulnerabilities that can be exploited by attackers, with potentially disastrous consequences. Our research project proposal was to investigate new approaches for secure and survivable SCADA systems. In particular, we were interested in the resilience and adaptability of large-scale mission-critical monitoring and control infrastructures. Our research proposal was divided in two main tasks. The first task was centered on the design and investigation of algorithms for survivable SCADA systems and a prototype framework demonstration. The second task was centered on the characterization and demonstration of the proposed approach in illustrative scenarios (simulated or emulated).

  8. New Security Development and Trends to Secure the SCADA Sensors Automated Transmission during Critical Sessions

    Directory of Open Access Journals (Sweden)

    Aamir Shahzad

    2015-10-01

    Full Text Available Modern technology enhancements have been used worldwide to fulfill the requirements of the industrial sector, especially in supervisory control and data acquisition (SCADA systems as a part of industrial control systems (ICS. SCADA systems have gained popularity in industrial automations due to technology enhancements and connectivity with modern computer networks and/or protocols. The procurement of new technologies has made SCADA systems important and helpful to processing in oil lines, water treatment plants, and electricity generation and control stations. On the other hand, these systems have vulnerabilities like other traditional computer networks (or systems, especially when interconnected with open platforms. Many international organizations and researchers have proposed and deployed solutions for SCADA security enhancement, but most of these have been based on node-to-node security, without emphasizing critical sessions that are linked directly with industrial processing and automation. This study concerns SCADA security measures related to critical processing with specified sessions of automated polling, analyzing cryptography mechanisms and deploying the appropriate explicit inclusive security solution in a distributed network protocol version 3 (DNP3 stack, as part of a SCADA system. The bytes flow through the DNP3 stack with security computational bytes within specified critical intervals defined for polling. We took critical processing knowledge into account when designing a SCADA/DNP3 testbed and deploying a cryptography solution that did not affect communications.

  9. A virtual computing infrastructure for TS-CV SCADA systems

    CERN Document Server

    Poulsen, S

    2008-01-01

    In modern data centres, it is an emerging trend to operate and manage computers as software components or logical resources and not as physical machines. This technique is known as â€ワvirtualisation” and the new computers are referred to as â€ワvirtual machines” (VMs). Multiple VMs can be consolidated on a single hardware platform and managed in ways that are not possible with physical machines. However, this is not yet widely practiced for control system deployment. In TS-CV, a collection of VMs or a â€ワvirtual infrastructure” is installed since 2005 for SCADA systems, PLC program development, and alarm transmission. This makes it possible to consolidate distributed, heterogeneous operating systems and applications on a limited number of standardised high-performance servers in the Central Control Room (CCR). More generally, virtualisation assists in offering continuous computing services for controls and maintaining performance and assuring quality. Implementing our systems in a vi...

  10. Smart Device Profiling for Smart SCADA

    NARCIS (Netherlands)

    Hadziosmanovic, D.; Bolzoni, D.; Hartel, Pieter H.

    2011-01-01

    SCADA (Supervisory Control and Data Acquisition) systems are computer systems used for monitoring and controlling industrial processes such as power plants and power grid systems, water, gas and oil distribution systems, production systems for food, cars and other products. We propose a new approach

  11. Smart Device Profiling for Smart SCADA

    NARCIS (Netherlands)

    Hadziosmanovic, D.; Bolzoni, D.; Hartel, Pieter H.

    SCADA (Supervisory Control and Data Acquisition) systems are computer systems used for monitoring and controlling industrial processes such as power plants and power grid systems, water, gas and oil distribution systems, production systems for food, cars and other products. We propose a new approach

  12. SCADA based radioactive sample bottle delivery system for fuel reprocessing project

    International Nuclear Information System (INIS)

    Kaushik, Subrat; Munj, Niket; Chauhan, R.K.; Kumar, Pramod; Mishra, A.C.

    2011-01-01

    Radioactive samples of process streams need to be analyzed in centralized control lab for measuring concentration of heavy elements as well as activity at various stages of re-processing plants. The sample is taken from biologically shielded process cells remotely through sampling blisters in sample bottles. These are then transferred to control lab located about 50 meters using vacuum transfer system. The bottle movement is tracked from origin to destination in rich HMI SCADA system using Infra-red non contact type proximity sensors located along sampling line and these sensors are connected to PLC in a fail-safe mode. The sample bottle travels at a speed of 10 m/s under vacuum motive force and the detection time is of the order of 1 mS. The contact time Flow meters have been used to know the air flow in sampling line

  13. An Integrated Dynamic Weighing System Based on SCADA

    Directory of Open Access Journals (Sweden)

    Piotr Bazydło

    2015-01-01

    Full Text Available A prototyped dynamic weighing system has been presented which integrates together three advanced software environments: MATLAB, LabVIEW and iFIX SCADA. They were used for advanced signal processing, data acquisition, as well as visualization and process control. Dynamic weighing is a constantly developing field of metrology. Because of the highly complicated structure of any electronic weighing module, it is vulnerable to many sources of environmental disturbances. For this reason, there is a lot of research concerned with weighing signal processing, mechanical matters and functionality of the system. In the paper, some issues connected with dynamic weighing have been presented, and the necessity of implementing signal processing methods has been discussed. Implementation of this feature is impossible in the majority of SCADA systems. The integration of the three environments mentioned above is an attempt to create an industrial system with capabilities to deal with major dynamic weighing problems. It is innovative because it connects the industrial SCADA, laboratory/industrial product LabVIEW and MATLAB. In addition, the algorithms responsible for process control and data exchange are presented. The paper includes a description of the capabilities, performance tests, as well as benefits and drawbacks, of the system. The outcome of the research is a prototyped system and evaluation of its usefulness. (original abstract

  14. Communication Test for ‘MatrikonOPC Server for SCADA DNP 3’ with RTDS

    DEFF Research Database (Denmark)

    Wu, Qiuwei; Cha, Seung-Tae; Saleem, Arshad

    2010-01-01

    The purpose of the communication test for ‘MatrikonOPC server for SCADA DNP 3’ with RTDS is to verify the data exchange between the ‘MatrikonOPC server for SCADA DNP 3’ and the RTDS using the DNP 3 protocol.The communication test is part of the work for the ‘Wind in Øresund’ project. The objective...... of the ‘Wind in Øresund’ project is to build a demonstration and education system of power system operation and control with a RTDS and a SCADA system....

  15. A First Look into SCADA Network Traffic

    NARCIS (Netherlands)

    Barbosa, R.R.R.; Sadre, R.; Pras, Aiko

    Supervisory Control and Data Acquisition (SCADA) networks are commonly deployed to aid the operation of critical infrastructures, such as water distribution facilities. These networks provide automated processes that ensure the correct functioning of these infrastructures, in a operation much

  16. A review of cyber security risk assessment methods for SCADA systems

    OpenAIRE

    Cherdantseva, Yulia; Burnap, Peter; Blyth, Andrew; Eden, Peter; Jones, Kevin; Soulsby, Hugh; Stoddart, Kristan

    2016-01-01

    This paper reviews the state of the art in cyber security risk assessment of Supervisory Control and Data Acquisition (SCADA) systems. We select and in-detail examine twenty-four risk assessment methods developed for or applied in the context of a SCADA system. We describe the essence of the methods and then analyse them in terms of aim; application domain; the stages of risk management addressed; key risk management concepts covered; impact measurement; sources of probabilistic data; evaluat...

  17. Bake-Out Mobile Controls for Large Vacuum Systems

    CERN Document Server

    Blanchard, S; Gomes, P; Pereira, H; Kopylov, L; Merker, S; Mikheev, M

    2014-01-01

    Large vacuum systems at CERN (Large Hadron Collider - LHC, Low Energy Ion Rings - LEIR...) require bake-out to achieve ultra-high vacuum specifications. The bake-out cycle is used to decrease the outgassing rate of the vacuum vessel and to activate the Non-Evaporable Getter (NEG) thin film. Bake-out control is a Proportional-Integral-Derivative (PID) regulation with complex recipes, interlocks and troubleshooting management and remote control. It is based on mobile Programmable Logic Controller (PLC) cabinets, fieldbus network and Supervisory Control and Data Acquisition (SCADA) application. The CERN vacuum installations include more than 7 km of baked vessels; using mobile cabinets reduces considerably the cost of the control system. The cabinets are installed close to the vacuum vessels during the time of the bake-out cycle. Mobile cabinets can be used in any of the CERN vacuum facilities. Remote control is provided through a fieldbus network and a SCADA application

  18. An engineering study and concept design of the Supervisory Control and Data Acquisition (SCADA) for conventional systems

    International Nuclear Information System (INIS)

    Norman, L.S.

    1993-05-01

    The study objective was to evaluate several conventional equipment SCADA system architectural concepts and to recommend an approach for development. Each of the concepts given consideration had to satisfy the Superconducting Super Collider (SSC) conventional equipment SCADA application requirements and the evaluation process determined which approach represented the best technical and most cost effective solution to the system requirements. Based on the results of the concept evaluation process, a personal computer based approach was recommended for the SSC conventional equipment SCADA application. Block diagrams and budgetary cost estimate for this approach were developed with specific recommendations with respect to the conventional equipment SCADA system architecture and development process

  19. Proposta de arquitetura orientada a recursos para SCADA na Web

    OpenAIRE

    Polônia, Pablo Valério

    2011-01-01

    Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico, Programa de Pós-Graduação em Engenharia de Automação e Sistemas, Florianópolis, 2011 Esta dissertação descreve uma proposta de arquitetura de software para aplicações típicas de Sistemas de Supervisão e Aquisição de Dados (SCADA), utilizando a World Wide Web como plataforma. O objetivo é mostrar como os requisitos característicos de aplicações SCADA podem ser incorporados em uma arquitetura condizente com ...

  20. Cyber security risk assessment for SCADA and DCS networks.

    Science.gov (United States)

    Ralston, P A S; Graham, J H; Hieb, J L

    2007-10-01

    The growing dependence of critical infrastructures and industrial automation on interconnected physical and cyber-based control systems has resulted in a growing and previously unforeseen cyber security threat to supervisory control and data acquisition (SCADA) and distributed control systems (DCSs). It is critical that engineers and managers understand these issues and know how to locate the information they need. This paper provides a broad overview of cyber security and risk assessment for SCADA and DCS, introduces the main industry organizations and government groups working in this area, and gives a comprehensive review of the literature to date. Major concepts related to the risk assessment methods are introduced with references cited for more detail. Included are risk assessment methods such as HHM, IIM, and RFRM which have been applied successfully to SCADA systems with many interdependencies and have highlighted the need for quantifiable metrics. Presented in broad terms is probability risk analysis (PRA) which includes methods such as FTA, ETA, and FEMA. The paper concludes with a general discussion of two recent methods (one based on compromise graphs and one on augmented vulnerability trees) that quantitatively determine the probability of an attack, the impact of the attack, and the reduction in risk associated with a particular countermeasure.

  1. Remote operation for pipelines; Operacao remota para gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Teixeira, Paulo Lyra Borgerth [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes pipeline GASBOL which are remotely monitored, operated and controlled from a central control station in Rio de Janeiro, Brazil. This is a result of TBG's experience in design, construction and operation of compressor stations and city gates that are built for unattended operation. Only a small maintenance crew is necessary for routine tasks. In this connection, a complete set of resources has been implemented in order to ensure the required reliability level. This includes monitoring instruments, redundant systems and protections, together with automatic control system for each of the relevant components. Equipment status signals, process variables as well as alarm and trip signals are exchanged via a SCADA system with the Control and Supervision Center, CSC, in Rio de Janeiro. In addition, the CSC is capable of performing all relevant control actions such as start / stop compressor units and station auxiliaries, also remotely setting the station pressure and flow control points. The paper describes also the architecture and configuration of the supervisory and control functions which are performed by means of a SCADA system, along with the pipeline telecommunications system. (author)

  2. Developments on the SCADA of CERN Accelerators Vacuum

    CERN Document Server

    Antoniotti, F; Boccioli, M; Gomes, P; Pereira, H; Kopylov, L; Mikheev, M; Merker, S

    2014-01-01

    During the first 3 years of LHC operation, the priority for the SCADA (Supervisory Control And Data Acquisition) of vacuum controls was to attend to user requests, and to improve its ergonomics and efficiency: access & presentation of information simplified and normalized; coherent functionalities & menus across all accelerators; automatic scripts instead of fastidious manual actions; enhanced tools for data analysis and for maintenance interventions. Several decades of cumulative developments, based on heterogeneous technologies and architectures, have been asking for a homogenization effort. The first LHC Long Shutdown (LS1) provides the opportunity to further standardize the vacuum controls systems [1], around Siemens-S7 PLCs (Programmable Logic Controllers) and PVSS SCADA. Meanwhile, exchanges with other Groups at CERN and outside Institutes have been promoted: to follow the global update policy for software libraries; to discuss philosophies and development details; and to accomplish common pro...

  3. SCADA based radioactive sample bottle delivery system for fuel reprocessing project

    International Nuclear Information System (INIS)

    Kaushik, Subrat; Munj, Niket; Chauhan, R.K.; Jayaram, M.N.; Haneef, K.K.M.

    2014-01-01

    Radioactive samples of process streams need to be analyzed in centralized control lab for measuring concentration of heavy elements as well as activity at various stages of re-processing plants. The sample is taken from biologically shielded process cells remotely through sampling blisters in sample bottles. These are then transferred to control lab located about 50 meters using vacuum transfer system. The bottle movement is tracked from origin to destination in rich HMI SCADA system using Infra-red non contact type proximity sensors located along sampling line and these sensors are connected to PLC in a fail-safe mode. The sample bottle travels at a speed of 10 m/s under vacuum motive force and the detection time is of the order of 1 mS. The flow meters have been used to know the air flow in sampling line. The system has been designed, developed, tested and commissioned and in use for four years. (author)

  4. Integration of Evora-InovGrid Smartmeters in a Consumer’s SCADA System

    OpenAIRE

    Pereira, Rita; Figueiredo, Joao; Martins, Joao; Quadrado, Jose; Melicio, Rui; Mendes, Victor

    2015-01-01

    This paper develops an energy management system with smart meters integration for electricity consumers in a smart grid context. The integration of a distributor owned smart meter from the main Portuguese electricity distributor – EDP - is developed. The smart meter is connected to a common PC, that runs the Matlab Software and communicates to the SCADA system (Supervisory Control And Data Acquisition) using the OPC Protocol. The SCADA system supervises an industrial network of Programmable L...

  5. Difficulties in Modeling SCADA Traffic: A Comparative Analysis

    NARCIS (Netherlands)

    Barbosa, R.R.R.; Sadre, R.; Pras, Aiko

    Modern critical infrastructures, such as water distribution and power generation, are large facilities that are distributed over large geographical areas. Supervisory Control and Data Acquisition (SCADA) networks are deployed to guarantee the correct operation and safety of these infrastructures. In

  6. Industrial Control Systems/SCADA systems risk assessment in the energy sector

    Science.gov (United States)

    Falodun, Babatunde

    The energy sector is one of the most critical components of our national infrastructure. It not only provides the electrical power and petroleum required to run day-to-day operations and mechanisms in society, it's also an important element that directly impacts the economy with regard to growth and stability. Industrial Control Systems (ICS) /Supervisory Control and Data Acquisition Systems (SCADA) are computerized mechanisms, they are both software and hardware that are used to control real time processes and operations in power plants and oil production facilities. A significant attack on these control systems that leads to widespread disruption of energy could result in catastrophic consequences for any major city and even the nation. This research paper explores cyber threats and vulnerabilities faced by ICS/SCADA systems in the energy sector and also highlights possible outcomes of a successful breach. Furthermore, the research underscores mitigation strategies that could be used to prevent and respond to an attack. Keywords: Cybersecurity, SCADA, Cyber Attacks, Threats, Vulnerabilities, Risk Assessment, Dr. Albert Orbinati.

  7. Evaluating resilience of DNP3-controlled SCADA systems against event buffer flooding

    Energy Technology Data Exchange (ETDEWEB)

    Yan, Guanhua [Los Alamos National Laboratory; Nicol, David M [UNIV OF IL; Jin, Dong [UNIV OF IL

    2010-12-16

    The DNP3 protocol is widely used in SCADA systems (particularly electrical power) as a means of communicating observed sensor state information back to a control center. Typical architectures using DNP3 have a two level hierarchy, where a specialized data aggregator device receives observed state from devices within a local region, and the control center collects the aggregated state from the data aggregator. The DNP3 communication between control center and data aggregator is asynchronous with the DNP3 communication between data aggregator and relays; this leads to the possibility of completely filling a data aggregator's buffer of pending events, when a relay is compromised or spoofed and sends overly many (false) events to the data aggregator. This paper investigates how a real-world SCADA device responds to event buffer flooding. A Discrete-Time Markov Chain (DTMC) model is developed for understanding this. The DTMC model is validated by a Moebius simulation model and data collected on real SCADA testbed.

  8. Enhancing the Safety, Security and Resilience of ICT and Scada Systems Using Action Research

    Science.gov (United States)

    Johnsen, Stig; Skramstad, Torbjorn; Hagen, Janne

    This paper discusses the results of a questionnaire-based survey used to assess the safety, security and resilience of information and communications technology (ICT) and supervisory control and data acquisition (SCADA) systems used in the Norwegian oil and gas industry. The survey identifies several challenges, including the involvement of professionals with different backgrounds and expertise, lack of common risk perceptions, inadequate testing and integration of ICT and SCADA systems, poor information sharing related to undesirable incidents and lack of resilience in the design of technical systems. Action research is proposed as a process for addressing these challenges in a systematic manner and helping enhance the safety, security and resilience of ICT and SCADA systems used in oil and gas operations.

  9. Installation of remote-handling typed EBSD-OIM analyzer for heavy irradiated reactor materials

    International Nuclear Information System (INIS)

    Kato, Yoshiaki; Takada, Fumiki; Ohmi, Masao; Nakagawa, Tetsuya; Miwa, Yukio

    2008-06-01

    The remote-handling typed EBSD-OIM analyzer for heavy irradiated reactor materials was installed in the JMTR hot laboratory at the first time in the world. The analyzer is used to study on IASCC (irradiation assisted stress corrosion cracking) or IGSCC (inter granular stress corrosion cracking) in reactor materials. This report describes the measurement procedure, the measured results and the operating experiences on the analyzer in the JMTR hot laboratory. (author)

  10. SCADA Sistemi ile Bir İşletmenin Dış Saha Otomasyonu

    OpenAIRE

    Kılıç, Murat; Özdemir, Şule

    2010-01-01

    Bu çalışmada, PLC (Programmable Logic Controller: Programlanabilir Mantık Denetleyici) ve SCADA (Supervising Control and Data Acquisition: Veri Tabanlı Kontrol ve Gözetleme) sistemleriyle bir MDF (Medium Density Fiberboard) presi dış saha besleme hattının otomasyonu gerçekleştirilmiştir. Tüm sistem SCADA sayesinde bilgisayar ekranından izlenebilmekte ve kontrol edilebilmektedir. MDF presi dış saha besleme hattı tam otomasyon ile çalışmaktadır. Otomasyon sisteminde PLC yazılımı olarak Siemens ...

  11. Towards Periodicity Based Anomaly Detection in SCADA Networks

    NARCIS (Netherlands)

    Barbosa, R.R.R.; Sadre, R.; Pras, Aiko

    Supervisory Control and Data Acquisition (SCADA) networks are commonly deployed to aid the operation of large industrial facilities. The polling mechanism used to retrieve data from field devices causes the data transmission to be highly periodic. In this paper, we propose an approach that exploits

  12. SCADA systems in the industrial automation

    Directory of Open Access Journals (Sweden)

    Esteban Pérez-López

    2015-12-01

    Este tipo de software constituye un avance de gran impacto en la automatización industrial, ya que permite ilustrar gráficamente los procesos productivos en pantalla y crear alarmas y advertencias en tiempo real, para el manejo confiado y pleno del proceso que se desea controlar. Se presentan los ejemplos de dos industrias que han aplicado SCADA con el fin de mejorar sus procesos, obteniendo muy buenos resultados.

  13. PLC SCADA systém pro řízení větrného tunelu

    OpenAIRE

    Trenčan, Tomáš

    2017-01-01

    Předložená bakalářská práce se věnuje programovatelnému automatu (PLC) firmy WAGO a SCADA systémům. Skládá se ze dvou části, z teoretické části a z praktické části. V teoretické části jsou na zakladě poznatků z odborné literatury vymezeny pojmy ohledně SCADA systémů, PLC od firmy WAGO a vývojového prostředí e!COCKPIT firmy WAGO a rešerše volně dostupných SCADA systémů podporujících Modbus TCP. Na základě této rešerše byl vybrán SCADA systém pro vizualizaci dvou demonstračníc úloh v praktické ...

  14. Wind turbine condition monitoring based on SCADA data using normal behavior models

    DEFF Research Database (Denmark)

    Schlechtingen, Meik; Santos, Ilmar; Achiche, Sofiane

    2013-01-01

    This paper proposes a system for wind turbine condition monitoring using Adaptive Neuro-Fuzzy Interference Systems (ANFIS). For this purpose: (1) ANFIS normal behavior models for common Supervisory Control And Data Acquisition (SCADA) data are developed in order to detect abnormal behavior...... the applicability of ANFIS models for monitoring wind turbine SCADA signals. The computational time needed for model training is compared to Neural Network (NN) models showing the strength of ANFIS in training speed. (2) For automation of fault diagnosis Fuzzy Interference Systems (FIS) are used to analyze...

  15. Anomaly Detection in SCADA Systems - A Network Based Approach

    NARCIS (Netherlands)

    Barbosa, R.R.R.

    2014-01-01

    Supervisory Control and Data Acquisition (SCADA) networks are commonly deployed to aid the operation of large industrial facilities, such as water treatment facilities. Historically, these networks were composed by special-purpose embedded devices communicating through proprietary protocols.

  16. Anomaly detection in SCADA systems: a network based approach

    NARCIS (Netherlands)

    Barbosa, R.R.R.

    2014-01-01

    Supervisory Control and Data Acquisition (SCADA) networks are commonly deployed to aid the operation of large industrial facilities, such as water treatment facilities. Historically, these networks were composed by special-purpose embedded devices communicating through proprietary protocols.

  17. Summer Student Work Project Report: SCADA Bridge Tool Development Automatically Capturing Data from SCADA to the Maintenance System

    CERN Document Server

    Alhambra-Moron, Alfonso

    2015-01-01

    The main purpose of this report is to summarize the work project I have been doing at CERN during the last 3 months as a Summer Student. My name is Alfonso Alhambra Morón and the 8th of June 2015 I joined the EN-HE-LM team as a summer student supervised by Damien Lafarge in order to collaborate in the automation of the transfer of meter readings from SCADA1 to Infor EAM2, the computerized maintenance management system at CERN. The main objective of my project was to enable the automatic updates of meters in Infor EAM fetching data from SCADA so as to automatize a process which was done manually before and consumed resources in terms of having to consult the meter physically, import this information to Infor EAM by hand and detecting and correcting the errors that can occur when doing all of this manually. This problem is shared by several other teams at CERN apart from the Lift Maintenance team and for this reason the main target I had when developing my solution was flexibility and scalability so as to make...

  18. Remote system for monitoring and control of controlled area of nuclear installation

    Energy Technology Data Exchange (ETDEWEB)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto [Departamento de Ciencias da Administracao e Tecnologia. Centro Universitario de Araraquara (UNIARA) Araraquara, SP (Brazil); Farias, Marcos Sant' anna de; Santos, Isaac J.A. Luquetti dos, E-mail: luquetti@ien.gov.br [Instituto Engenharia Nuclear (IEN/CNEN-RJ), Rio Janeiro, RJ (Brazil). Divisao de Instrumentacao e Confiabilidade Humana

    2011-07-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  19. Remote system for monitoring and control of controlled area of nuclear installation

    International Nuclear Information System (INIS)

    Assuncao, Daniel Gomes de; Minhoni, Danilo Carlos Rossetto; Farias, Marcos Sant'anna de; Santos, Isaac J.A. Luquetti dos

    2011-01-01

    The maintenance activities in controlled areas of nuclear facilities require adequate planning and control so that these activities do not cause to the worker an undue exposure to radioactivity. For maximum safety of workers from these places, there are standards that determine the maximum radiation dose that a worker can receive. From this context, the objective of this research is to develop a remote system that shows remotely the maintenance tasks being carried out in this work environment; monitors information provided by radiation monitoring devices installed at workplace; tracks the time to carry out scheduled maintenance, reporting alarm if this time is exceeded or not. The system has video camera, radiation monitoring device, interface card to transmit data via ethernet and graphical user interface, developed using the LABVIEW application. The principal objective is to improve the safety and to preserve the worker's health. (author)

  20. Remote monitoring of solar and wind power installation via GSN and Internet; Sistema de telegestion de instalaciones solares y eolicas a traves de GSN e Internet

    Energy Technology Data Exchange (ETDEWEB)

    Caballero, P. M. L.; Valmaseda, J. C. T.; Uruena, H. J. C.; Bujedo, L. A. N.

    2004-07-01

    Remote monitoring of solar and wind power installations is important for installers since some local rules oblige them to keep a maintenance plan, and the installations are normally sparse. It is also important for end users because they demand more information about the system and management capacity each time. In this paper we present CARTIF's development for the company ENERPAL to fulfil these needs. It is formed by two subsystems: one for data acquisition and control of the installations via GSM, and the other, a server software that allows the user to access her installation remotely through the Internet in order to manage it. (Author)

  1. A Parameter Selection Method for Wind Turbine Health Management through SCADA Data

    Directory of Open Access Journals (Sweden)

    Mian Du

    2017-02-01

    Full Text Available Wind turbine anomaly or failure detection using machine learning techniques through supervisory control and data acquisition (SCADA system is drawing wide attention from academic and industry While parameter selection is important for modelling a wind turbine’s condition, only a few papers have been published focusing on this issue and in those papers interconnections among sub-components in a wind turbine are used to address this problem. However, merely the interconnections for decision making sometimes is too general to provide a parameter list considering the differences of each SCADA dataset. In this paper, a method is proposed to provide more detailed suggestions on parameter selection based on mutual information. First, the copula is proven to be capable of simplifying the estimation of mutual information. Then an empirical copulabased mutual information estimation method (ECMI is introduced for application. After that, a real SCADA dataset is adopted to test the method, and the results show the effectiveness of the ECMI in providing parameter selection suggestions when physical knowledge is not accurate enough.

  2. Anomaly-based intrusion detection for SCADA systems

    International Nuclear Information System (INIS)

    Yang, D.; Usynin, A.; Hines, J. W.

    2006-01-01

    Most critical infrastructure such as chemical processing plants, electrical generation and distribution networks, and gas distribution is monitored and controlled by Supervisory Control and Data Acquisition Systems (SCADA. These systems have been the focus of increased security and there are concerns that they could be the target of international terrorists. With the constantly growing number of internet related computer attacks, there is evidence that our critical infrastructure may also be vulnerable. Researchers estimate that malicious online actions may cause $75 billion at 2007. One of the interesting countermeasures for enhancing information system security is called intrusion detection. This paper will briefly discuss the history of research in intrusion detection techniques and introduce the two basic detection approaches: signature detection and anomaly detection. Finally, it presents the application of techniques developed for monitoring critical process systems, such as nuclear power plants, to anomaly intrusion detection. The method uses an auto-associative kernel regression (AAKR) model coupled with the statistical probability ratio test (SPRT) and applied to a simulated SCADA system. The results show that these methods can be generally used to detect a variety of common attacks. (authors)

  3. Supervisory Control and Data Acquisition (SCADA) Systems and Cyber-Security: Best Practices to Secure Critical Infrastructure

    Science.gov (United States)

    Morsey, Christopher

    2017-01-01

    In the critical infrastructure world, many critical infrastructure sectors use a Supervisory Control and Data Acquisition (SCADA) system. The sectors that use SCADA systems are the electric power, nuclear power and water. These systems are used to control, monitor and extract data from the systems that give us all the ability to light our homes…

  4. MANAGEMENT OF GAS-AIR ENERGY INSTALLATION OF INDUSTRIAL ENTERPRISE

    Directory of Open Access Journals (Sweden)

    V. Y. Lobov

    2018-02-01

    Full Text Available Purpose. The goal of the work is to substantiate the issue of effective use of kinetic energy of gas-air flows used by the technological installation for generating electric power, which will allow developing a new control algorithm and creating new software for controlling the gas-air power plant. To test the adequacy of the developed control algorithms and software, to develop a laboratory gas-air power plant. Methodology. To investigate the distribution of air-gas mass in process plants used industrial plant simulation method performed in software SolidWorks Flow Simulation. The method of simulation allowed to develop a new control algorithm and create new software taking into account the basic technical requirements for the management of the gas-air power plant. To test the efficiency of the developed algorithms and control software for the gas-air power plant, a physical modeling method was used on a developed laboratory installation connected via a USB interface with a computer and has a virtual model of the SCADA system presented in the LabVIEW environment. Findings. Based on the modeling of gas-air flows on the developed mathematical model, the optimal ratios of pipeline sizes are rationally determined, the gas-air mixture costs necessary for the most efficient operation of the gas-air power plant, that is, in the working zone of the gas-air path, the generator screw contacts the most significant flows, providing the maximum effect rotation. The obtained results of research of gas-air flows of technological installations of an industrial enterprise in the software environment of SolidWorks Flow Simulation and on their basis the basic technical requirements for the management of a gas-air power plant are developed. An optimal control algorithm has been developed that enabled it to be introduced into the control scheme of a gas-air power plant with a microprocessor or a specialized microcontroller. Originality. New possibilities for

  5. Design of SCADA water resource management control center by a bi-objective redundancy allocation problem and particle swarm optimization

    International Nuclear Information System (INIS)

    Dolatshahi-Zand, Ali; Khalili-Damghani, Kaveh

    2015-01-01

    SCADA is an essential system to control critical facilities in big cities. SCADA is utilized in several sectors such as water resource management, power plants, electricity distribution centers, traffic control centers, and gas deputy. The failure of SCADA results in crisis. Hence, the design of SCADA system in order to serve a high reliability considering limited budget and other constraints is essential. In this paper, a bi-objective redundancy allocation problem (RAP) is proposed to design Tehran's SCADA water resource management control center. Reliability maximization and cost minimization are concurrently considered. Since the proposed RAP is a non-linear multi-objective mathematical programming so the exact methods cannot efficiently handle it. A multi-objective particle swarm optimization (MOPSO) algorithm is designed to solve it. Several features such as dynamic parameter tuning, efficient constraint handling and Pareto gridding are inserted in proposed MOPSO. The results of proposed MOPSO are compared with an efficient ε-constraint method. Several non-dominated designs of SCADA system are generated using both methods. Comparison metrics based on accuracy and diversity of Pareto front are calculated for both methods. The proposed MOPSO algorithm reports better performance. Finally, in order to choose the practical design, the TOPSIS algorithm is used to prune the Pareto front. - Highlights: • Multi-objective redundancy allocation problem (MORAP) is proposed to design SCADA system. • Multi-objective particle swarm optimization (MOPSO) is proposed to solve MORAP. • Efficient epsilon-constraint method is adapted to solve MORAP. • Non-dominated solutions are generated on Pareto front of MORAP by both methods. • Several multi-objective metrics are calculated to compare the performance of methods

  6. Monitoring and Assessment of Military Installation Land Condition under Training Disturbance Using Remote Sensing

    Science.gov (United States)

    Rijal, Santosh

    Various military training activities are conducted in more than 11.3 million hectares of land (> 5,500 training sites) in the United States (U.S.). These training activities directly and indirectly degrade the land. Land degradation can impede continuous military training. In order to sustain long term training missions and Army combat readiness, the environmental conditions of the military installations need to be carefully monitored and assessed. Furthermore, the National Environmental Policy Act of 1969 (NEPA) and the U.S. Army Regulation 200-2 require the DoD to minimize the environmental impacts of training and document the environmental consequences of their actions. To achieve these objectives, the Department of Army initiated an Integrated Training Area Management (ITAM) program to manage training lands through assessing their environmental requirements and establishing policies and procedures to achieve optimum, sustainable use of training lands. One of the programs under ITAM, Range and Training Land Assessment (RTLA) was established to collect field-based data for monitoring installation's environmental condition. Due to high cost and inefficiencies involved in the collection of field data, the RTLA program was stopped in several military installations. Therefore, there has been a strong need to develop an efficient and low cost remote sensing based methodology for assessing and monitoring land conditions of military installations. It is also important to make a long-term assessment of installation land condition for understanding cumulative impacts of continuous military training activities. Additionally, it is unclear that compared to non-military land condition, to what extent military training activities have led to the degradation of land condition for military installations. The first paper of this dissertation developed a soil erosion relevant and image derived cover factor (ICF) based on linear spectral mixture (LSM) analysis to assess and

  7. MicroSCADA project documentation database

    OpenAIRE

    Kolam, Karolina

    2014-01-01

    Detta ingenjörsarbete var beställt av ABB Power Systems, Network Management. Syftet med detta ingenjörsarbete var att skapa en databas för dokumentering av information om MicroSCADA projekt. Ett lämpligt verktyg för att skapa rapporter och skriva ny data till databasen skulle också ingå. Före detta ingenjörsarbete sparades all information som skilda textdokument. Med en databas kunde man samla all information på ett ställe för att arkiveras under en längre tid. Det förenklad...

  8. A Review of Communications Protocol for Intelligent Remote Terminal Unit Development

    Directory of Open Access Journals (Sweden)

    Mohd Ruddin Ab. Ghani

    2013-11-01

    Full Text Available This paper reviewed all the possible interfacing communication protocols for remote terminal unit (RTU. Supervisory Control and Data Acquisition (SCADA system is a central station that can communicate with other network using the protocol. Fundamentally, the architectures of all networks are based on the seven layers of open system interconnection (OSI and International Standard Organization (ISO. The objective of designing the protocols is to check the status of all the input and output field devices and send the report according to that status. The corresponding protocol and communication parameters between the connecting devices will be included in designing a complex SCADA system. The available protocols to develop the communication of RTU are Modbus/ASCII, distributed network protocol (DNP3, controller area network (CAN, International Electro-technical Commission (IEC 60870, transmission control protocol/internet protocol (TCP/IP.

  9. Evaluating Information Assurance Control Effectiveness on an Air Force Supervisory Control and Data Acquisition (SCADA) System

    Science.gov (United States)

    2011-03-01

    Byres, E. J., Lowe, J. (2004). The Myths and facts behind cyber security risks for industrial control systems . Berlin, Germany: VDE 2004 Congress...ACQUISITION (SCADA) SYSTEM THESIS Jason R. Nielsen, Major, USAF AFIT/GCO/ENG/11-10 DEPARTMENT OF THE AIR FORCE AIR UNIVERSITY AIR FORCE...DATA ACQUISITION (SCADA) SYSTEM THESIS Presented to the Faculty Department of Electrical and Computer Engineering Graduate School of

  10. Idaho National Laboratory Supervisory Control and Data Acquisition Intrusion Detection System (SCADA IDS)

    Energy Technology Data Exchange (ETDEWEB)

    Jared Verba; Michael Milvich

    2008-05-01

    Current Intrusion Detection System (IDS) technology is not suited to be widely deployed inside a Supervisory, Control and Data Acquisition (SCADA) environment. Anomaly- and signature-based IDS technologies have developed methods to cover information technology-based networks activity and protocols effectively. However, these IDS technologies do not include the fine protocol granularity required to ensure network security inside an environment with weak protocols lacking authentication and encryption. By implementing a more specific and more intelligent packet inspection mechanism, tailored traffic flow analysis, and unique packet tampering detection, IDS technology developed specifically for SCADA environments can be deployed with confidence in detecting malicious activity.

  11. Practical automation for mature producing areas

    International Nuclear Information System (INIS)

    Luppens, J.C.

    1995-01-01

    Successful installation and operation of supervisory control and data acquisition (SCADA) systems on two US gulf coast platforms, prompted the installation of the first SCADA, or automation, system in Oklahoma in 1989. The initial installation consisted of four remote terminal units (RTU's) at four beam-pumped leases and a PC-based control system communicating by means of a 900-MHz data repeated. This first installation was a building block for additional wells to be automated, and then additional systems, consisting of RTU's, a PC, and a data repeated, were installed. By the end of 1992 there were 98 RTU's operating on five separation systems and additional RTU's are being installed on a regular basis. This paper outlines the logical development of automation systems on properties in Oklahoma operated by Phillips Petroleum Co. Those factors critical to the success of the effort are (1) designing data-gathering and control capability in conjunction with the field operations staff to meet and not exceed their needs; (2) selection of a computer operating system and automation software package; (3) selection of computer, RTU, and end-device hardware; and (4) continuous involvement of the field operations staff in the installation, operation, and maintenance of the systems. Additionally, specific tangible and intangible results are discussed

  12. Process Control/SCADA system vendor security awareness and security posture.

    NARCIS (Netherlands)

    Luiijf, H.A.M.; Lüders, S.

    2009-01-01

    A starting point for the adequate security of process control/SCADA systems is the security awareness and security posture by the manufacturers, vendors, system integrators, and service organisations. The results of a short set of questions indicate that major security improvements are required in

  13. Unavailability of critical SCADA communication links interconnecting a power grid and a Telco network

    International Nuclear Information System (INIS)

    Bobbio, A.; Bonanni, G.; Ciancamerla, E.; Clemente, R.; Iacomini, A.; Minichino, M.; Scarlatti, A.; Terruggia, R.; Zendri, E.

    2010-01-01

    The availability of power supply to power grid customers depends upon the availability of services of supervision, control and data acquisition (SCADA) system, which constitutes the nervous system of a power grid. In turn, SCADA services depend on the availability of the interconnected networks supporting such services. We propose a service oriented stochastic modelling methodology to investigate the availability of large interconnected networks, based on the hierarchical application of different modelling formalisms to different parts of the networks. Interconnected networks are decomposed according to the specific services delivered until the failure and repair mechanisms of the decomposed elementary blocks can be identified. We represent each network by a convenient stochastic modelling formalism, able to capture the main technological issues and to cope with realistic assumptions about failure and recovery mechanisms. This procedure confines the application of the more intensive computational techniques to those subsystems that actually require it. The paper concentrates on an actual failure scenario, occurred in Rome in January 2004 that involved the outage of critical SCADA communication links, interconnecting a power grid and a Telco network.

  14. Unavailability of critical SCADA communication links interconnecting a power grid and a Telco network

    Energy Technology Data Exchange (ETDEWEB)

    Bobbio, A. [Dipartimento di Informatica, Universita del Piemonte Orientale, Viale Michel 11, 15121 Alessandria (Italy); Bonanni, G.; Ciancamerla, E. [ENEA - CRE Casaccia, Via Anguillarese 301, 00060 Roma (Italy); Clemente, R. [Telecom Italia Mobile, Via Isonzo112, 10141 Torino (Italy); Iacomini, A. [ACEA, Pl. Ostiense 2, 00154 Roma (Italy); Minichino, M., E-mail: minichino@casaccia.enea.i [ENEA - CRE Casaccia, Via Anguillarese 301, 00060 Roma (Italy); Scarlatti, A. [ACEA, Pl. Ostiense 2, 00154 Roma (Italy); Terruggia, R. [Dipartimento di Informatica, Universita del Piemonte Orientale, Viale Michel 11, 15121 Alessandria (Italy); Zendri, E. [ACEA, Pl. Ostiense 2, 00154 Roma (Italy)

    2010-12-15

    The availability of power supply to power grid customers depends upon the availability of services of supervision, control and data acquisition (SCADA) system, which constitutes the nervous system of a power grid. In turn, SCADA services depend on the availability of the interconnected networks supporting such services. We propose a service oriented stochastic modelling methodology to investigate the availability of large interconnected networks, based on the hierarchical application of different modelling formalisms to different parts of the networks. Interconnected networks are decomposed according to the specific services delivered until the failure and repair mechanisms of the decomposed elementary blocks can be identified. We represent each network by a convenient stochastic modelling formalism, able to capture the main technological issues and to cope with realistic assumptions about failure and recovery mechanisms. This procedure confines the application of the more intensive computational techniques to those subsystems that actually require it. The paper concentrates on an actual failure scenario, occurred in Rome in January 2004 that involved the outage of critical SCADA communication links, interconnecting a power grid and a Telco network.

  15. Automatic diagnosis method for scada operability

    OpenAIRE

    Syrotkina, O. I.

    2015-01-01

    Пропонується до розгляду методика автоматичної діагностики працездатності SCADA системи в режимі реального часу за зміною інформаційно-діагностичних ознак контрольованих параметрів у процесі проходження потоків даних за структурними одиницями і рівнями ієрархії SCADA. В рамках методики були сформульовані необхідні і достатні критерії виявлення відмови в системі, необхідні і достатні критерії розмежування незалежних і вторинних відмов на підставі логіки функціонування SCADA з ур...

  16. MEDUSA: Mining Events to Detect Undesirable uSer Actions in SCADA

    NARCIS (Netherlands)

    Hadziosmanovic, D.; Bolzoni, D.; Hartel, Pieter H.; Jha, Somesh; Sommer, Robin; Kreibich, Christian

    2010-01-01

    Standard approaches for detecting malicious behaviors, e.g. monitoring network traffic, cannot address process-related threats in SCADA(Supervisory Control And Data Acquisition) systems. These threats take place when an attacker gains user access rights and performs actions which look legitimate,

  17. A new cyber security risk evaluation method for oil and gas SCADA based on factor state space

    International Nuclear Information System (INIS)

    Yang, Li; Cao, Xiedong; Li, Jie

    2016-01-01

    Based on comprehensive analysis of the structure and the potential safety problem of oil and gas SCADA(Supervisor control and data acquisition) network, aiming at the shortcomings of traditional evaluation methods, combining factor state space and fuzzy comprehensive evaluation method, a new network security risk evaluation method of oil and gas SCADA is proposed. First of all, formal description of factor state space and its complete mathematical definition were presented; secondly, factor fuzzy evaluation steps were discussed; then, using analytic hierarchy method, evaluation index system for oil and gas SCADA system was established, the index weights of all factors were determined by two-two comparisons; structure design of three layers in reasoning machine was completed. Experiments and tests show that the proposed method is accurate, reliable and practical. Research results provide the template and the new method for the other industries.

  18. Assessing and improving SCADA security in the Dutch drinking water sector

    NARCIS (Netherlands)

    Luiijf, H.A.M.; Ali, M.; Zielstra, A.

    2011-01-01

    International studies have shown that information security for process control systems, in particular SCADA, is weak. Many of the critical infrastructure (CI) services critically depend on process control systems. Therefore, any vulnerability in the protection of process control systems in CI may

  19. Assessing and Improving SCADA Security in the Dutch Drinking Water Sector

    NARCIS (Netherlands)

    Luiijf, H.A.M.; Ali, M.; Zielstra, A.

    2009-01-01

    International studies have shown that information security for process control systems, in particular SCADA, is weak. As many critical infrastructure (CI) services depend on process control systems, any vulnerability in the protection of process control systems in CI may result in serious

  20. Perancangan SCADA Software dengan Wonderware InTouch Recipe Manager dan SQL Access Manager pada Simulator Proses Pencampuran Bahan

    OpenAIRE

    Wicaksono, Handy; Lim, Resmana; Sutanto, William

    2008-01-01

    In Bahasa Indonesia: Banyak industri yang sudah menggunakan sistem automasi dengan menggunakan PLC (Programmable Logic Controller) dan SCADA (Supervisory Control And Data Acquisition). Salah satu software untuk membuat program SCADA adalah Wonderware InTouch. Untuk mengelola data dalam bentuk recipe dan database, Wonderware InTouch mempunyai program-program tambahan yaitu Recipe Manager dan SQL Access Manager. Pada penelitian ini, akan digunakan proses pembuatan kertas sebagai contoh kas...

  1. Design and Implementation of IoT Cloud Moveable SCADA Supported by GSM for Industrial Applications

    Directory of Open Access Journals (Sweden)

    Mahmoud Shaker Nasr

    2017-05-01

    Full Text Available The world at the beginning of a new era of innovation and development with the rise of the industrial Internet or Internet of Things, IoT. It takes the space through the convergence of the global industrial system with the power of advanced computing, analytics, and low cost sensor devices and innovation of communication allowed by the Internet. One of the most important developments is IoT SCADA systems, which are considered as infrastructure of society because of their potential enormous in several industrial applications. This paper presents the design of a new generation of SCADA, named moveable SCADA , based on IoT cloud, and supported by GSM for more flexibility and reliability. The system is applied to industrial application that consists of three-control processes which are temperature, liquid level and motor processes. The three control processes data acquisition and controllers are implemented using embedded microcontroller system while a gateway is used to transfer the data proceed in field supervisor at first as well as main supervisor and monitoring engineer through IoT cloud. The system supported by GSM unit to support the system in case of internet failure. Also a camera is added to the system in order to monitor any location, any location (determined by any of the authorities in the field where the camera is mounted. The proposed SCADA is implemented practically and tested for many cases; the presented obtained results demonstrate that the system operation is very fair and meet the required targets.

  2. Designing SCADA application software a practical approach

    CERN Document Server

    McCrady, Stuart G

    2013-01-01

    Automation systems, often referred to as SCADA systems, involve programming at several levels; these systems include computer type field controllers that monitor and control plant equipment such as conveyor systems, pumps, and user workstations that allow the user to monitor and control the equipment through color graphic displays. All of the components of these systems are integrated through a network, such as Ethernet for fast communications. This book provides a practical guide to developing the application software for all aspects of the automation system, from the field controll

  3. PV-Diesel Hybrid SCADA Experiment Network Design

    Science.gov (United States)

    Kalu, Alex; Durand, S.; Emrich, Carol; Ventre, G.; Wilson, W.; Acosta, R.

    1999-01-01

    The essential features of an experimental network for renewable power system satellite based supervisory, control and data acquisition (SCADA) are communication links, controllers, diagnostic equipment and a hybrid power system. Required components for implementing the network consist of two satellite ground stations, to satellite modems, two 486 PCs, two telephone receivers, two telephone modems, two analog telephone lines, one digital telephone line, a hybrid-power system equipped with controller and a satellite spacecraft. In the technology verification experiment (TVE) conducted by Savannah State University and Florida Solar Energy Center, the renewable energy hybrid system is the Apex-1000 Mini-Hybrid which is equipped with NGC3188 for user interface and remote control and the NGC2010 for monitoring and basic control tasks. This power system is connected to a satellite modem via a smart interface, RS232. Commands are sent to the power system control unit through a control PC designed as PC1. PC1 is thus connected to a satellite model through RS232. A second PC, designated PC2, the diagnostic PC is connected to both satellite modems via separate analog telephone lines for checking modems'health. PC2 is also connected to PC1 via a telephone line. Due to the unavailability of a second ground station for the ACTS, one ground station is used to serve both the sending and receiving functions in this experiment. Signal is sent from the control PC to the Hybrid system at a frequency f(sub 1), different from f(sub 2), the signal from the hybrid system to the control PC. f(sub l) and f(sub 2) are sufficiently separated to avoid interference.

  4. Effectiveness of SCADA Systems in Control of Green Sands Properties

    Directory of Open Access Journals (Sweden)

    Ignaszak Z.

    2016-03-01

    Full Text Available The paper undertakes an important topic of evaluation of effectiveness of SCADA (Supervisory Control and Data Acquisition systems, used for monitoring and control of selected processing parameters of classic green sands used in foundry. Main focus was put on process studies of properties of so-called 1st generation molding sands in the respect of their preparation process. Possible methods of control of this processing are presented, with consideration of application of fresh raw materials, return sand (regenerate and water. The studies conducted in one of European foundries were aimed at pointing out how much application of new, automated plant of sand processing incorporating the SCADA systems allows stabilizing results of measurement of selected sand parameters after its mixing. The studies concerned two comparative periods of time, before an implementation of the automated devices for green sands processing (ASMS - Automatic Sand Measurement System and MCM – Main Control Module and after the implementation. Results of measurement of selected sand properties after implementation of the ASMS were also evaluated and compared with testing studies conducted periodically in laboratory.

  5. Software design practice using two SCADA software packages

    DEFF Research Database (Denmark)

    Basse, K.P.; Christensen, Georg Kronborg; Frederiksen, P. K.

    1996-01-01

    Typical software development for manufacturing control is done either by specialists with consideral real-time programming experience or done by the adaptation of standard software packages for manufacturing control. After investigation and test of two commercial software packages: "InTouch" and ......Touch" and "Fix", it is argued, that a more efficient software solution can be achieved by utilising an integrated specification for SCADA and PLC-programming. Experiences gained from process control is planned investigated for descrete parts manufacturing....

  6. Economic and environmental assessment of rooftops regarding suitability for photovoltaic systems installation based on remote sensing data

    International Nuclear Information System (INIS)

    Lukač, Niko; Seme, Sebastijan; Dežan, Katarina; Žalik, Borut; Štumberger, Gorazd

    2016-01-01

    Within the last few years, the increase of the world's energy consumption has substantially impacted the environment. Solar energy initiative is more than ever involved to tackle this issue, especially when deploying PV (photovoltaic) systems over large-scale residential areas. However, not all surfaces in these areas are economically suitable, while some surfaces have low CO_2 mitigation. With the availability of high-resolution remote sensing data, the estimation of suitable rooftops for PV systems installation can be performed automatically by estimating the PV potential. This paper presents a novel method for estimating NPV (net present value) of the potential PV systems installed on rooftops by using LiDAR (Light Detection And Ranging) data and PV systems' nonlinear efficiency characteristics. More importantly, the environmental impact is estimated for each rooftop through EPBT (energy payback time) and GGER (greenhouse gas emission rate), based on the life-cycle of a specific PV system. This is combined with NPV in order to find rooftops that are both economically and environmentally viable candidates for PV systems deployment. Results demonstrate a case study LiDAR data for predicting each building's economical and environmental impact, as well as providing an overall view of resulting cumulative CO_2 mitigation over large residential area. - Highlights: • The method relies on PV potential estimation over LiDAR remote sensing data. • Novel economic assessment of PV systems using remote sensing data is proposed. • Environmental analysis of PV systems based on EPBT and GGER is performed. • Estimation of CO_2 mitigation over LiDAR data by considering national energy network.

  7. Experience of FlexCtrl SCADA usage for accelerator automation

    International Nuclear Information System (INIS)

    Nikiforov, A.S.; Alejnikov, V.V.; Sychev, K.P.; Borina, I.V.; Rukavishnikov, A.A.

    2012-01-01

    Software of particle accelerator control system is described in this paper. Software is based on licensed software (FlexCtrl SCADA, Photon Application Builder, Cogent DataHub) and additionally developed class library. This software is integrated programming environment and according to its functionality serves as visual programming. Properties number of IDE components as well as components number can be increased due to the fact that IDE is characterized by its openness

  8. Improved production operating efficiencies through automation: Wascana Energy`s SCADA system implementation in southeast Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, R; Foord, T; Bartle, A

    1996-12-31

    Supervisory control and data acquisition (SCADA) systems covering Wascana Energy`s whole southeast Saskatchewan operating area were implemented in 1994-95. The benefits of this automation were described. Operations practices were reviewed and a brief description of the system was provided. Main features of the system described included data storage/retrieval, data display, alarm group organization, alarm call out monitoring, dynagraph display, and the Microsoft SQL server computer. Automation was found to significantly change the operator`s traditional role and altered operation practices in general. SCADA systems were found to improve operating efficiencies and production performance significantly, when properly implemented and utilized. 6 refs., 3 figs.

  9. The Research and Improvement of SDT Algorithm for Historical Data in SCADA

    Directory of Open Access Journals (Sweden)

    Xu Xu-Dong

    2017-01-01

    Full Text Available With the rapid development of Internet of things and big data technology, the amount of data collected by SCADA(Supervisory Control And Data Acquisitionsystem is growing exponentially, which the traditional SDT algorithm can not meet the requirements of SCADA system for historical data compression. In this paper, ASDT(Advanced SDT algorithm based on SDT algorithm is proposed and implemented in the Java language, which is based on the deep research of the data compression method, especially the Swing Door Trending. ASDT algorithm through the sine curve fitting data to achieve data compression, compared with the performance of the traditional SDT algorithm, which it can achieve better compression results. The experimental results show that compared with the traditional SDT algorithm, the ASDT algorithm can improve the compression ratio in the case of no significant increase in the compression error, and the compression radio is increased by nearly 50%.

  10. SCADA system with predictive controller applied to irrigation canals

    OpenAIRE

    Figueiredo, João; Botto, Miguel; Rijo, Manuel

    2013-01-01

    This paper applies a model predictive controller (MPC) to an automatic water canal with sensors and actuators controlled by a network (programmable logic controller), and supervised by a SCADA system (supervisory control and a data acquisition). This canal is composed by a set of distributed sub-systems that control the water level in each canal pool, constrained by discharge gates (control variables) and water off-takes (disturbances). All local controllers are available through an industria...

  11. Automatically Identifying and Predicting Unplanned Wind Turbine Stoppages Using SCADA and Alarms System Data: Case Study and Results

    Science.gov (United States)

    Leahy, Kevin; Gallagher, Colm; Bruton, Ken; O'Donovan, Peter; O'Sullivan, Dominic T. J.

    2017-11-01

    Using 10-minute wind turbine SCADA data for fault prediction offers an attractive way of gaining additional prognostic capabilities without needing to invest in extra hardware. To use these data-driven methods effectively, the historical SCADA data must be labelled with the periods when the turbine was in faulty operation as well the sub-system the fault was attributed to. Manually identifying faults using maintenance logs can be effective, but is also highly time consuming and tedious due to the disparate nature of these logs across manufacturers, operators and even individual maintenance events. Turbine alarm systems can help to identify these periods, but the sheer volume of alarms and false positives generated makes analysing them on an individual basis ineffective. In this work, we present a new method for automatically identifying historical stoppages on the turbine using SCADA and alarms data. Each stoppage is associated with either a fault in one of the turbine’s sub-systems, a routine maintenance activity, a grid-related event or a number of other categories. This is then checked against maintenance logs for accuracy and the labelled data fed into a classifier for predicting when these stoppages will occur. Results show that the automated labelling process correctly identifies each type of stoppage, and can be effectively used for SCADA-based prediction of turbine faults.

  12. Condition monitoring with wind turbine SCADA data using Neuro-Fuzzy normal behavior models

    DEFF Research Database (Denmark)

    Schlechtingen, Meik; Santos, Ilmar

    2012-01-01

    System (ANFIS) models are employed to learn the normal behavior in a training phase, where the component condition can be considered healthy. In the application phase the trained models are applied to predict the target signals, e.g. temperatures, pressures, currents, power output, etc. The behavior......This paper presents the latest research results of a project that focuses on normal behavior models for condition monitoring of wind turbines and their components, via ordinary Supervisory Control And Data Acquisition (SCADA) data. In this machine learning approach Adaptive Neuro-Fuzzy Interference...... of the prediction error is used as an indicator for normal and abnormal behavior, with respect to the learned behavior. The advantage of this approach is that the prediction error is widely decoupled from the typical fluctuations of the SCADA data caused by the different turbine operational modes. To classify...

  13. An Approach to Vulnerability Assessment for Navy Supervisory Control and Data Acquisition (SCADA) Systems

    National Research Council Canada - National Science Library

    Hart, Dennis

    2004-01-01

    .... SCADA systems are relied upon in a large number of the sectors that make up the critical infrastructure, and their importance was reinforced during the massive power outage that occurred in August 2003...

  14. SCADA System for the Modeling and Optimization of Oil Collecting Pipeline Network: A Case Study of Hassi Messaoud Oilfield

    OpenAIRE

    M. Aouadj; F. Naceri; M. Touileb; D. Sellami; M. Boukhatem

    2015-01-01

    This study aims are data acquisition, control and online modeling of an oil collection pipeline network using a SCADA «Supervisory Control and Data Acquisition» system, allowing the optimization of this network in real time by creating more exact models of onsite facilities. Indeed, fast development of computing systems makes obsolete usage of old systems for which maintenance became more and more expensive and their performances don’t comply any more with modern company operations. SCADA sys...

  15. Remote system of data acquisition and equipment maintenance with communication door Series; Sistema remoto de aquisicao de dados e manutencao de equipamentos com portas de comunicacao Serie

    Energy Technology Data Exchange (ETDEWEB)

    Marques, Ailton; Cabrera, Fernando [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The present work has for objective to present the Remote System of Data Acquisition and Equipment Maintenance with Communication door Series - GASYRG. The solution is based on a converter of protocol (Serial -Ethernet) and a panel that the function of commutator (switch) managed by control system assumes (SCADA). (author)

  16. THE ORGANIZATION OF OPERATIONAL CONTROL AND MANAGEMENT OF ROLL FORMING USING SCADA- SYSTEMS

    Directory of Open Access Journals (Sweden)

    S. A. Teslenko

    2012-01-01

    Full Text Available It is shown that the use Scada-systems for the organization of various systems of automated processes is the most promising method of automation, that gives wide opportunities of control, analysis and management of compiex dynamic, real-time systems.

  17. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  18. Study on Parameters Modeling of Wind Turbines Using SCADA Data

    Directory of Open Access Journals (Sweden)

    Yonglong YAN

    2014-08-01

    Full Text Available Taking the advantage of the current massive monitoring data from Supervisory Control and Data Acquisition (SCADA system of wind farm, it is of important significance for anomaly detection, early warning and fault diagnosis to build the data model of state parameters of wind turbines (WTs. The operational conditions and the relationships between the state parameters of wind turbines are complex. It is difficult to establish the model of state parameter accurately, and the modeling method of state parameters of wind turbines considering parameter selection is proposed. Firstly, by analyzing the characteristic of SCADA data, a reasonable range of data and monitoring parameters are chosen. Secondly, neural network algorithm is adapted, and the selection method of input parameters in the model is presented. Generator bearing temperature and cooling air temperature are regarded as target parameters, and the two models are built and input parameters of the models are selected, respectively. Finally, the parameter selection method in this paper and the method using genetic algorithm-partial least square (GA-PLS are analyzed comparatively, and the results show that the proposed methods are correct and effective. Furthermore, the modeling of two parameters illustrate that the method in this paper can applied to other state parameters of wind turbines.

  19. An Architectural Framework for Describing Supervisory Control and Data Acquisition (SCADA) Systems

    Science.gov (United States)

    2004-09-01

    The significant difference between FMS, DP and PA is at the physical layer, which allows all three versions of Profibus to be employed in one SCADA...instrumentation devices, DP devices where speed is important, and PA devices where safety and reliability is required. At the data link layer, Profibus ...12 e. Profibus

  20. Predicting Faults in Wind Turbines Using SCADA Data

    DEFF Research Database (Denmark)

    Borchersen, Anders Bech; Larsen, Jesper Abildgaard; Stoustrup, Jakob

    2013-01-01

    The cost of operation and maintenance of wind turbines is a significant part of the overall cost of wind turbines. To reduce this cost a method for enabling early fault detection is proposed and tested in this paper. The method is taking advantage of the fact that wind turbines in wind farms...... and tested on historical Supervisory Control And Data Acquisition (SCADA) data from nine operational turbines over a testing period of nine months. The performance of the fault detection is found to be acceptable based on the testing period. During the testing period several gear related services were...

  1. JACoW Integration of the vacuum SCADA with CERN's Enterprise Asset Management system

    CERN Document Server

    Rocha, Andre; Fraga, Jorge; Gkioka, Georgia; Gomes, Paulo; Gonzalez, Luis; Krastev, Tsvetelin; Riddone, Germana; Widegren, David

    2018-01-01

    With over 128Km of vacuum chambers, reaching pressures as low as in interstellar space, CERN is home to the largest vacuum system in the world. Its underlying architecture comprises approximately 15 000 pieces of control equipment, supervised and controlled by 7 Supervisory Control And Data Acquisition (SCADA) servers, and over 300 Programmable Logic Controllers (PLCs). Their configuration files are automatically generated from a set of ORACLE databases (vacDB) using a Java application (vacDB-Editor). The maintenance management of such an amount of equipment requires the usage of an Enterprise Asset Management system (EAM), where the life cycle of every equipment is tracked from reception through decommissioning. The equipment displayed in the vacuum SCADA is automatically integrated in its user interfaces (UIs) based on data available on vacDB. On the other hand, the equipment available in Infor-EAM for maintenance management activities (creation of work-orders, stock management, location tracking) resides i...

  2. Multiple Flow Loop SCADA System Implemented on the Production Prototype Loop

    Energy Technology Data Exchange (ETDEWEB)

    Baily, Scott A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dalmas, Dale Allen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wheat, Robert Mitchell [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Woloshun, Keith Albert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dale, Gregory E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-16

    The following report covers FY 15 activities to develop supervisory control and data acquisition (SCADA) system for the Northstar Moly99 production prototype gas flow loop. The goal of this effort is to expand the existing system to include a second flow loop with a larger production-sized blower. Besides testing the larger blower, this system will demonstrate the scalability of our solution to multiple flow loops.

  3. Water Wells Monitoring Using SCADA System for Water Supply Network, Case Study: Water Treatment Plant Urseni, Timis County, Romania

    Science.gov (United States)

    Adrian-Lucian, Cococeanu; Ioana-Alina, Cretan; Ivona, Cojocinescu Mihaela; Teodor Eugen, Man; Narcis, Pelea George

    2017-10-01

    The water supply system in Timisoara Municipality is insured with about 25-30 % of the water demand from wells. The underground water headed to the water treatment plant in order to ensure equal distribution and pressure to consumers. The treatment plants used are Urseni and Ronaţ, near Timisoara, in Timis County. In Timisoara groundwater represents an alternative source for water supply and complementary to the surface water source. The present paper presents a case study with proposal and solutions for rehabilitation /equipment /modernization/ automation of water drilling in order to ensure that the entire system can be monitored and controlled remotely through SCADA (Supervisory control and data acquisition) system. The data collected from the field are designed for online efficiency monitoring regarding the energy consumption and water flow intake, performance indicators such as specific energy consumption KW/m3 and also in order to create a hydraulically system of the operating area to track the behavior of aquifers in time regarding the quality and quantity aspects.

  4. MULTILINGUAL RECODING METHOD DESIGNED FOR SCADA-SYSTEM’S SOFTWARE UPGRADE

    Directory of Open Access Journals (Sweden)

    S. Velykodniy

    2017-06-01

    Full Text Available The article discusses a new approach to upgrade the software for SCADA-systems. A distinctive feature of this method is the ability to support more than ten most popular programming languages. By applying this method it’s possible to automate the process of recoding software components and, by doing so, it saves time programmers have to spend to rewrite the code and reduce the likelihood of structural errors inherited from the previous system.

  5. CÁLCULO Y DISEÑO DE UN SISTEMA DE CONTROL MEDIANTE LA IMPLEMENTACION DE UN SOFTWARE SCADA EN EL CURSO DE PROYECTO INTEGRADOR II

    Directory of Open Access Journals (Sweden)

    Karla Puerto-López

    2014-12-01

    Full Text Available El objetivo de este documento es ilustrar cada una de etapas que intervienen en el diseño de un sistema SCADA (Supervisory Control And Data Adquisition partiendo de la elaboración de layout estructural mecánico, potencia eléctrica orientado a procesos industriales El objetivo de este trabajo es analizar y especificar los requerimientos para software SCADA (Supervisory Control And Data Adquisition orientados a todo tipo de empresas del sector industrial. Se presentan los análisis efectuados a software SCADA comerciales relevando los usuarios existentes en el mercado. Además se presenta un análisis basado en un desarrollo propio realizado con un lenguaje de propósito general.

  6. Remote operated valves - the Bolivian approach

    Energy Technology Data Exchange (ETDEWEB)

    Cuellar, O.; Arce, G.; Blanco, E.; Collazos, A.; Chavarria, E. [Transredes S.A., Transporte de Hidrocarburos, La Paz (Bolivia)

    2005-07-01

    For pipeline operators, the Remote Operated Valves (ROV) are tools to isolate pipe segments and contain any potential spill and they are also useful tools to provide data on operating conditions. Projects and articles about the locations and site layouts were developed to install Remote Operated Valves and the criteria for their use; each location has its own environmental, social and logistical particulars. This article describes the approach used to install ROV in Bolivia and the final design installed discussions and lessons learned about the: criteria to define the location, layout equipment installed and shelter and particulars of the location. (author)

  7. Remote inspection system for components installed inside a primary containment vessel of a boiling water reactor

    International Nuclear Information System (INIS)

    Shimizu, Katsutoshi; Kawai, Katsumi; Ito, Takahiko; Hashimoto, Yuji; Tomizawa, Fumio.

    1983-01-01

    A remote operation type monitoring system was developed to always enable the watching of the condition of the main equipment installed in the containment vessels of BWRs. It comprises four inspection vehicles suspended by a monorail and pulled with trolley chain, coaxial cables for signal transmission and power supply, and control system. On the inspection vehicles, a television camera, a thermometer, a microphone and a radiation dose rate meter are installed. The performance of the system was confirmed at 60 deg C for several months. Thereafter, the field test was carried out in the Tokai No. 2 Power Station, Japan Atomic Power Co., from December, 1980, to September, 1981. By the continuous monitoring and grasp of operational condition, the preventive maintenance and the improvement of the rate of operation can be expected. Also it is desirable in view of the reduction of radiation exposure of operators. The mechanization of and the labor saving in inspection and maintenance works is necessary because skilled workers will be short. The design and the composition of the system and its tests are reported. (Kako, I.)

  8. Design for high productivity remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Sykes, N., E-mail: nick.sykes@ccfe.ac.uk [Culham Centre For Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Collins, S.; Loving, A.B.; Ricardo, V. [Culham Centre For Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Villedieu, E. [Association Euratom-CEA Cadarache, DSM/IRFM, Saint Paul Les Durance (France)

    2011-10-15

    As the central part of a programme of enhancements in support of ITER, the Joint European Torus (JET) is being equipped with an all-metal wall. This enhancement programme requires the removal and installation of 6927 tile carriers and tiles, as well as the removal and installation of embedded diagnostics and antennas. The scale of this operation and the necessity to maximise operational availability of the facility added a requirement for high productivity in the remote activities to the existing exigencies of precision, reliability, cleanliness and operational security. This high productivity requirement has been incorporated into the design of the components and associated installation tooling, the design of the installation equipment, the development of installation procedures including the use of a mock-up for optimisation and training. Consideration of the remote handling installation process is vital during the design of the in vessel components. A number of features to meet the need of the high productivity while maintaining the function requirements have been incorporated into the metal wall components and associated tooling including kinematic design with guidance appropriate for remote operation. The component and tools are designed to guide the attachment of the installation tool, the installation path, and the interlocking with adjacent components without contact between the fragile castellated beryllium of the adjacent tiles. Other incorporated ergonomic features are discussed. At JET, the remote maintenance is conducted using end effectors, normally bi-lateral force feed back manipulator, mounted on driven, articulated booms. Prior to the current shutdown one long boom was used to conduct the installation and collect and deliver components to the 'short' boom which was linked to the tile carrier transfer facility. This led to loss of efficiency during these movements. The adoption of a new remote handling philosophy using 'point of

  9. Design for high productivity remote handling

    International Nuclear Information System (INIS)

    Sykes, N.; Collins, S.; Loving, A.B.; Ricardo, V.; Villedieu, E.

    2011-01-01

    As the central part of a programme of enhancements in support of ITER, the Joint European Torus (JET) is being equipped with an all-metal wall. This enhancement programme requires the removal and installation of 6927 tile carriers and tiles, as well as the removal and installation of embedded diagnostics and antennas. The scale of this operation and the necessity to maximise operational availability of the facility added a requirement for high productivity in the remote activities to the existing exigencies of precision, reliability, cleanliness and operational security. This high productivity requirement has been incorporated into the design of the components and associated installation tooling, the design of the installation equipment, the development of installation procedures including the use of a mock-up for optimisation and training. Consideration of the remote handling installation process is vital during the design of the in vessel components. A number of features to meet the need of the high productivity while maintaining the function requirements have been incorporated into the metal wall components and associated tooling including kinematic design with guidance appropriate for remote operation. The component and tools are designed to guide the attachment of the installation tool, the installation path, and the interlocking with adjacent components without contact between the fragile castellated beryllium of the adjacent tiles. Other incorporated ergonomic features are discussed. At JET, the remote maintenance is conducted using end effectors, normally bi-lateral force feed back manipulator, mounted on driven, articulated booms. Prior to the current shutdown one long boom was used to conduct the installation and collect and deliver components to the 'short' boom which was linked to the tile carrier transfer facility. This led to loss of efficiency during these movements. The adoption of a new remote handling philosophy using 'point of installation

  10. Reduce operational cost and extend the life of pipeline infrastructure by automating remote cathodic protection systems

    Energy Technology Data Exchange (ETDEWEB)

    Rosado, Elroy [Freewave Technologies, Inc., Boulder, CO (United States). Latin America

    2009-07-01

    Energy and Pipeline Companies wrestle to control operating costs largely affected by new government regulations, ageing buried metal assets, rising steel prices, expanding pipeline operations, new interference points, HCA encroachment, restrictive land use policies, heightened network security, and an ageing soon-to-retire work force. With operating costs on the rise, seemingly out of control, many CP and Operations Professionals look to past best practices in cost containment through automation. Many companies achieve solid business results through deployment of telemetry and SCADA automation of remote assets and now hope to expand this success to further optimize operations by automating remote cathodic protection systems. This presentation will provide examples of how new remote cathodic protection systems are helping energy and pipeline companies address the growing issue of the aging pipeline infrastructure and reduce their costs while optimizing their operations. (author)

  11. A Survey of Research in Supervisory Control and Data Acquisition (SCADA)

    Science.gov (United States)

    2014-09-01

    RISC ) platforms running some version of UNIX.4 Around the turn of the millennium work began on applying Web technologies to SCADA systems.5–8 Lately...the 2 trend has been to move from the UNIX/ RISC system to commodity hardware and Microsoft solutions although there is some Linux,1 to move from...Control Center MTU Master Terminal Unit OS operating system PKI Public Key Infrastructure PLC Programmable Logic Controller RISC Reduced Instruction

  12. Installation for analytic chemistry under irradiation

    International Nuclear Information System (INIS)

    Fradin, J.; Azoeuf, P.; Guillon, A.

    1966-01-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [fr

  13. Installation for analytic chemistry under irradiation; Installation de chimie analytique sous rayonnement

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Azoeuf, P; Guillon, A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-07-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [French] L'installation a ete realisee pour effectuer des manipulations et des analyses chimiques sur des produits radioactifs. Elle est totalement telecommandee et se presente sous une forme lineaire de 15 metres de longueur et comporte trois zones: - une zone active d'appareillage, - une zone arriere d'intervention, - une zone avant independante des deux premieres et totalement protegee, ou s'operent les telecommandes de l'appareillage. L'ensemble a ete concu de facon a ce que chaque appareillage correspondant a une technique d'analyse soit implante dans une enceinte etanche. Les enceintes etanches sont reliees entre elles par un convoyeur. Apres trois annees de fonctionnement nous faisons le bilan et les critiques de l'installation. (auteurs)

  14. Practical remote monitoring using COTS equipment

    International Nuclear Information System (INIS)

    Kadner, S.; White, R.M.; Pepper, S.

    1999-01-01

    It has been clear for some time that the gap between the international nonproliferation verification agenda and the available financial means can only be bridged by adoption of remote monitoring technologies in specific safeguards applications. Past technology development efforts have focused largely on sensor networking and dedicated communications services to link the inspector to the Safeguards instruments using the traditional verification paradigm. Today we have several Commercial Off The Shelf (COTS) sensor networking alternatives that are viable for Safeguards and it has been found that no single communication service can be uniformly deployed in all verification scenarios. While sensor networking is an important element of remote monitoring technology, it does not by itself provide a viable remote monitoring capability. This paper discusses several lessons have been learned from the IAEA's remote monitoring installation in Pelindaba, South Africa and how those lessons have been extended to near-term installations in Japan and Canada. Key among those lessons is that the traditional verification paradigm cannot, and should not, be carried forward into the remote monitoring regime and that the primary technology component of the successful remote monitoring installation is the Server, which processes, filters, categorizes, and otherwise acts on the sensor inputs to dramatically reduce the volume and increase the information -density of data that is transferred remotely using indigenous communication infrastructures. (author)

  15. Underground ventilation remote monitoring and control system

    International Nuclear Information System (INIS)

    Strever, M.T.; Wallace, K.G. Jr.; McDaniel, K.H.

    1995-01-01

    This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe underground disposal of U.S. defense generated transuranic nuclear waste. To improve the operability of the ventilation system, an underground remote monitoring and control system was designed and installed. The system consists of 15 air velocity sensors and 8 differential pressure sensors strategically located throughout the underground facility providing real-time data regarding the status of the ventilation system. In addition, a control system was installed on the main underground air regulators. The regulator control system gives indication of the regulator position and can be controlled either locally or remotely. The sensor output is displayed locally and at a central surface location through the site-wide Central Monitoring System (CMS). The CMS operator can review all sensor data and can remotely operate the main underground regulators. Furthermore, the Virtual Address Extension (VAX) network allows the ventilation engineer to retrieve real-time ventilation data on his personal computer located in his workstation. This paper describes the types of sensors selected, the installation of the instrumentation, and the initial operation of the remote monitoring system

  16. Why SCADA security is NOT like Computer Centre Security

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    Today, the industralized world lives in symbiosis with control systems (aka SCADA systems): it depends on power distribution, oil production, public transport, automatic production lines. While the convenience is at hand, still too many control systems are designed without any security in mind, lack basic security protections, and are not even robust enough to withstand basic attacks. The Stuxnet worm attacking Siemens PLCs in 2010 was another close call. Attackers currently enjoy hacking control systems, and aim to switch lights off. This presentation shall recap the current situation and discuss the differences (or not) between computer center cyber-security and control system cyber-security.

  17. Installations for radiation therapy with remote controlled afterloading technique. Ferngesteuerte Applikationsanlagen zur Therapie mit umschlossenen radioaktiven Stoffen

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Installations for radiation therapy with remote controlled afterloading technique; radiation protection rules for fabrication and construction; amendment 1 to draft standard (DIN) 6853. Compared to the draft standard of Semptember 1980, the following modifications are planned as amendment 1: a. Paragraph no. 1: In the title, the word ''scope'' is changed into ''field of application''. The words ''by moving the radiation source electromecanically'' are deleted. b. Paragraph no. 2'' Standards also applicable'' and the list of ''Additional standards'' are summarized under the heading ''Standards and supporting documents'' (without any paragraph number). c. Paragraph no. 3 ''Terms'' is completed by additional terms and their definitions.

  18. Remote maintenance development, July 1975--July 1976

    International Nuclear Information System (INIS)

    Fletcher, R.D.

    1977-04-01

    The results of the second year's efforts on remote handling development and studies for remote maintenance of failure-prone areas of the New Waste Calcining Facility (NWCF) are presented. Test arrangements and results for specific viewing situations and component remote installation and removal in the Remote Maintenance Development Facility (RMDF) and component material evaluations are discussed

  19. Propuesta de gestión de riesgos para Scada en sistemas eléctricos

    Directory of Open Access Journals (Sweden)

    María J. Bernal Zuluaga

    2012-12-01

    Full Text Available En la actualidad los ataques cibernéticos son uno de los principales aspectos a considerar por parte de los entes gubernamentales y por las empresas prestadoras de servicios públicos, dado que dichas entidades son el blanco preferido para desestabilizar el normal desempeño de las actividades de un sector determinado. En particular, la prestación del servicio eléctrico es fundamental para la operación de la mayor parte de las actividades diarias a nivel comercial, industrial y social de nuestro país. Los centros de control eléctricos cuentan con el Sistema SCADA para tener información en tiempo real que facilite la supervisión, control y toma de decisiones necesarias para garantizar la seguridad y calidad en la prestación del servicio eléctrico. Este artículo trata de la gestión de riesgos del sistema SCADA y la definición de un plan de tratamiento en el cual se exponen las medidas de control que deben ser implementadas para la mitigación de los riesgos a los cuales está expuesto dicho sistema.

  20. Data Mining Learning Models and Algorithms on a Scada System Data Repository

    Directory of Open Access Journals (Sweden)

    Mircea Rîşteiu

    2010-06-01

    Full Text Available This paper presents three data mining techniques applied
    on a SCADA system data repository: Naijve Bayes, k-Nearest Neighbor and Decision Trees. A conclusion that k-Nearest Neighbor is a suitable method to classify the large amount of data considered is made finally according to the mining result and its reasonable explanation. The experiments are built on the training data set and evaluated using the new test set with machine learning tool WEKA.

  1. Construction of a remote radiotherapy planning system

    International Nuclear Information System (INIS)

    Ogawa, Yoshihiro; Nemoto, Kenji; Takahashi, Chiaki; Takai, Yoshihiro; Yamada, Shogo; Seiji, Hiromasa; Sasaki, Kazuya

    2005-01-01

    We constructed a remote radiotherapy planning system, and we examined the usefulness of and faults in our system in this study. Two identical radiotherapy planning systems, one installed at our institution and the other installed at an affiliated hospital, were used for radiotherapy planning. The two systems were connected by a wide area network (WAN), using a leased line. Beam data for the linear accelerator at the affiliated hospital were installed in the two systems. During the period from December 2001 to December 2002, 43 remote radiotherapy plans were made using this system. Data were transmitted using a file transfer protocol (FTP) software program. The 43 radiotherapy plans examined in this study consisted of 13 ordinary radiotherapy plans, 28 radiotherapy plans sent to provide assistance for medical residents, and 2 radiotherapy plans for emergency cases. There were ten minor planning changes made in radiotherapy plans sent to provide assistance for medical residents. Our remote radiotherapy planning system based on WAN using a leased line is useful for remote radiotherapy, with advantages for both radiation oncologists and medical residents. (author)

  2. Supervisory Control and Data Acquisition (SCADA) Security Awareness In a Resource Constrained Learning Environment

    Science.gov (United States)

    2014-06-16

    SCADA systems are connected in some manner to the Global Information Grid ( GIG ), the requirement to educate future computer scientists, software...improves retention and understanding of the learning outcomes [6]. Due to the impact these vulnerabilities can have on the economy , military, and...implications such as what impact a persistent blackout would have on local and national economies . Once a firm understanding of the strategic impacts

  3. Combating Memory Corruption Attacks On Scada Devices

    Science.gov (United States)

    Bellettini, Carlo; Rrushi, Julian

    Memory corruption attacks on SCADA devices can cause significant disruptions to control systems and the industrial processes they operate. However, despite the presence of numerous memory corruption vulnerabilities, few, if any, techniques have been proposed for addressing the vulnerabilities or for combating memory corruption attacks. This paper describes a technique for defending against memory corruption attacks by enforcing logical boundaries between potentially hostile data and safe data in protected processes. The technique encrypts all input data using random keys; the encrypted data is stored in main memory and is decrypted according to the principle of least privilege just before it is processed by the CPU. The defensive technique affects the precision with which attackers can corrupt control data and pure data, protecting against code injection and arc injection attacks, and alleviating problems posed by the incomparability of mitigation techniques. An experimental evaluation involving the popular Modbus protocol demonstrates the feasibility and efficiency of the defensive technique.

  4. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  5. Remote participation for LHD experiments

    International Nuclear Information System (INIS)

    Emoto, M.; Yamamoto, T.; Komada, S.; Nagayama, Y.

    2006-01-01

    To accomplish a large-scale experiment, such as large helical device (LHD) experiment, effective cooperation among institutes is necessary. In order to establish such cooperation, the NIFS provides the following remote participation facilities for the LHD experiments. (1) Remote access: The user can use a virtual private network (VPN) to connect to the LAN. This is the most flexible technique to participate in the experiments. The users who are not familiar with the experiments can log into the remote server running MetaFrame and Linux. In these computers, the required software is already installed. Therefore, the user need not be concerned with installing software. (2) Remote data reference: A mirror server exists to provide physical data to remote users. Moreover, the users can retrieve summarized data via a web server, which provides summarized information of each discharge experiment and graphs of the principal physical data. These graphs are useful for finding the required data quickly. (3) Remote communication and monitoring: For effective remote cooperation, communication between researchers is very important. For this purpose, a video conferencing system and a video streaming service are available. In addition to these facilities, the NIFS introduced Super SINET in 2002. This is an optical-fiber-based network. The backbone speed of this network is 10 Gbps, and the speed is 1 Gbps for direct connections

  6. Remote participation for LHD experiments

    Energy Technology Data Exchange (ETDEWEB)

    Emoto, M. [National Institute for Fusion Science, National Institutes of Natural Sciences, 322-6 Oroshi, Toki 509-5292 (Japan)]. E-mail: emoto.masahiko@LHD.nifs.ac.jp; Yamamoto, T. [National Institute for Fusion Science, National Institutes of Natural Sciences, 322-6 Oroshi, Toki 509-5292 (Japan); Komada, S. [National Institute for Fusion Science, National Institutes of Natural Sciences, 322-6 Oroshi, Toki 509-5292 (Japan); Nagayama, Y. [National Institute for Fusion Science, National Institutes of Natural Sciences, 322-6 Oroshi, Toki 509-5292 (Japan)

    2006-07-15

    To accomplish a large-scale experiment, such as large helical device (LHD) experiment, effective cooperation among institutes is necessary. In order to establish such cooperation, the NIFS provides the following remote participation facilities for the LHD experiments. (1) Remote access: The user can use a virtual private network (VPN) to connect to the LAN. This is the most flexible technique to participate in the experiments. The users who are not familiar with the experiments can log into the remote server running MetaFrame and Linux. In these computers, the required software is already installed. Therefore, the user need not be concerned with installing software. (2) Remote data reference: A mirror server exists to provide physical data to remote users. Moreover, the users can retrieve summarized data via a web server, which provides summarized information of each discharge experiment and graphs of the principal physical data. These graphs are useful for finding the required data quickly. (3) Remote communication and monitoring: For effective remote cooperation, communication between researchers is very important. For this purpose, a video conferencing system and a video streaming service are available. In addition to these facilities, the NIFS introduced Super SINET in 2002. This is an optical-fiber-based network. The backbone speed of this network is 10 Gbps, and the speed is 1 Gbps for direct connections.

  7. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  8. LESSONS LEARNED FROM CYBER SECURITY ASSESSMENTS OF SCADA AND ENERGY MANAGEMENT SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Ray Fink

    2006-10-01

    The results from ten cyber security vulnerability assessments of process control, SCADA and energy management systems, or components of those systems were reviewed to identify common problem areas. The common vulnerabilities ranged from conventional IT security issues to specific weaknesses in control system protocols. In each vulnerability category, relative measures were assigned to the severity of the vulnerability and ease with which an attacker could exploit the vulnerability. Suggested mitigations are identified in each category. Recommended mitigations having the highest impact on reducing vulnerability are listed for asset owners and system vendors.

  9. Wind turbine condition monitoring based on SCADA data using normal behavior models

    DEFF Research Database (Denmark)

    Schlechtingen, Meik; Santos, Ilmar

    2014-01-01

    system (ANFIS) models in this context and the application of a proposed procedure to a wide range of different SCADA signals. The applicability of the set up ANFIS models for anomaly detection was proven by the achieved performance of the models. In combination with the fuzzy interference system (FIS......) a hydraulic oil leakage; (2) cooling system filter obstructions; (3) converter fan malfunctions; (4) anemometer offsets and (5) turbine controller malfunctions. Moreover, the graphical user interface (GUI) developed to access, analyze and visualize the data and results is presented....

  10. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  11. Determining the Return of Energy Efficiency Investments in Domestic and Deployed Military Installations

    National Research Council Canada - National Science Library

    Gammache, Nathan J

    2007-01-01

    ...: the use of Energy Savings Performance Contracts to fund energy efficiency improvements at domestic military installations, and the use of waste to energy generators at remote, deployed military installations...

  12. Production optimization of remotely operated gas wells

    Energy Technology Data Exchange (ETDEWEB)

    Juell, Aleksander

    2012-07-01

    From the introduction: The Remote Operations in Oklahoma Intended for Education (ROOKIE) project is a remote field laboratory constructed as a part of this research project. ROOKIE was initiated to provide data in research on production optimization of low productivity gas wells. In addition to this, ROOKIE is used as a teaching tool. Much of the remote operations technology used in the ROOKIE project has been used by the industry for several decades. The first use of remote data acquisition in Oklahoma was in 1989, as described by Luppens [7]. Even though this, for the most part, is old technology, the ROOKIE project is the first remote operations project set up with research and teaching as the main focus. This chapter will discuss the process of establishing the remote field laboratory and the data storage facilities. Results from the project will also be discussed. All testing, instrumentation installation, and modifications to the wells discussed in this chapter was performed by the author. The communication system between the well and NTNU, and the storage database was installed and configured by the author.(Author)

  13. Diseño e implantación de un sistema SCADA para una planta de producción y envasado de líquidos

    OpenAIRE

    Redondo Sol, Manuel

    2008-01-01

    Este proyecto consiste en la implantación de un sistema SCADA en una planta piloto de fabricación y envasado de líquidos. En este documento se muestra toda la información que ha sido necesaria para realizar el sistema de automatización en los tres niveles propios de un SCADA: nivel de campo, nivel de control y nivel de supervisión. El trabajo de campo ha sido, típicamente de revisión, puesto que el Departament de Telecomunicació i d'Enginyeria de Sistemes ya poseía la planta totalmente equipa...

  14. Development Of Remote Hanford Connector Gasket Replacement Tooling For DWPF

    International Nuclear Information System (INIS)

    Krementz, D.; Coughlin, Jeffrey

    2009-01-01

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and

  15. Steam generation process control and automation; Automacao e controle no processo de geracao de vapor

    Energy Technology Data Exchange (ETDEWEB)

    Souza Junior, Jose Cleodon de; Silva, Walmy Andre C.M. da [PETROBRAS S.A., Natal, RN (Brazil)

    2004-07-01

    This paper describes the implementation of the Supervisory Control and Data Acquisition System (SCADA) in the steam generation process for injection in heavy oil fields of the Alto do Rodrigues Production Asset, developed by PETROBRAS/E and P/UN-RNCE. This Asset is located in the northeastern region of Brazil, in Rio Grande do Norte State. It addresses to the steam generators for injection in oil wells and the upgrade project that installed remote terminal units and a new panel controlled by PLC, changed all the pneumatic transmitters by electronic and incorporated the steam quality and oxygen control, providing the remote supervision of the process. It also discusses the improvements obtained in the steam generation after the changes in the conception of the control and safety systems. (author)

  16. Startup of the remote laboratory-scale waste-treatment facility

    International Nuclear Information System (INIS)

    Knox, C.A.; Siemens, D.H.; Berger, D.N.

    1981-01-01

    The Remote Laboratory-Scale Waste-Treatment Facility was designed as a system to solidify small volumes of radioactive liquid wastes. The objectives in operating this facility are to evaluate solidification processes, determine the effluents generated, test methods for decontaminating the effluents, and provide radioactive solidified waste products for evaluation. The facility consists of a feed-preparation module, a waste-solidification module and an effluent-treatment module. The system was designed for remote installation and operation. Several special features for remotely handling radioactive materials were incorporated into the design. The equipment was initially assembled outside of a radiochemical cell to size and fabricate the connecting jumpers between the modules and to complete some preliminary design-verification tests. The equipment was then disassembled and installed in the radiochemical cell. When installation was completed the entire system was checked out with water and then with a nonradioactive simulated waste solution. The purpose of these operations was to start up the facility, find and solve operational problems, verify operating procedures and train personnel. The major problems experienced during these nonradioactive runs were plugging of the spray calciner nozzle and feed tank pumping failures. When these problems were solved, radioactive operations were started. This report describes the installation of this facility, its special remote design feature and the startup operations

  17. International remote monitoring project Argentina Nuclear Power Station Spent Fuel Transfer Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, S.; Lucero, R.; Glidewell, D.

    1997-01-01

    The Autoridad Regulataria Nuclear (ARN) and the United States Department of Energy (DOE) are cooperating on the development of a Remote Monitoring System for nuclear nonproliferation efforts. A Remote Monitoring System for spent fuel transfer will be installed at the Argentina Nuclear Power Station in Embalse, Argentina. The system has been designed by Sandia National Laboratories (SNL), with Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) providing gamma and neutron sensors. This project will test and evaluate the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguards efficiency. This paper provides a description of the monitoring system and its functions. The Remote Monitoring System consists of gamma and neutron radiation sensors, RF systems, and video systems integrated into a coherent functioning whole. All sensor data communicate over an Echelon LonWorks Network to a single data logger. The Neumann DCM 14 video module is integrated into the Remote Monitoring System. All sensor and image data are stored on a Data Acquisition System (DAS) and archived and reviewed on a Data and Image Review Station (DIRS). Conventional phone lines are used as the telecommunications link to transmit on-site collected data and images to remote locations. The data and images are authenticated before transmission. Data review stations will be installed at ARN in Buenos Aires, Argentina, ABACC in Rio De Janeiro, IAEA Headquarters in Vienna, and Sandia National Laboratories in Albuquerque, New Mexico. 2 refs., 2 figs

  18. Analyzing wind turbine directional behavior: SCADA data mining techniques for efficiency and power assessment

    International Nuclear Information System (INIS)

    Castellani, Francesco; Astolfi, Davide; Sdringola, Paolo; Proietti, Stefania; Terzi, Ludovico

    2017-01-01

    Highlights: • The directional behavior of four turbines of an onshore wind farm is investigated. • The positions of the nacelles are discretized to highlight clusterization effects. • The recurrent alignment patterns of the cluster are individuated and analyzed. • The patterns are studied by the point of view of efficiency and power output. • Significative performance deviations arise among the most frequent configurations. - Abstract: SCADA control systems are the keystone for reliable performance optimization of wind farms. Processing into knowledge the amount of information they spread is a challenging task, involving engineering, physics, statistics and computer science skills. This work deals with SCADA data analysis methods for assessing the importance of how wind turbines align in patterns to the wind direction. In particular it deals with the most common collective phenomenon causing clusters of turbines behaving as a whole, rather than as a collection of individuality: wake effects. The approach is based on the discretization of nacelle position measurements and subsequent post-processing through simple statistical methods. A cluster, severely affected by wakes, from an onshore wind farm, is selected as test case. The dominant alignment patterns of the cluster are identified and analyzed by the point of view of power output and efficiency. It is shown that non-trivial alignments with respect to the wind direction arise and important performance deviations occur among the most frequent configurations.

  19. Improving Security for SCADA Sensor Networks with Reputation Systems and Self-Organizing Maps

    Directory of Open Access Journals (Sweden)

    Javier Blesa

    2009-11-01

    Full Text Available The reliable operation of modern infrastructures depends on computerized systems and Supervisory Control and Data Acquisition (SCADA systems, which are also based on the data obtained from sensor networks. The inherent limitations of the sensor devices make them extremely vulnerable to cyberwarfare/cyberterrorism attacks. In this paper, we propose a reputation system enhanced with distributed agents, based on unsupervised learning algorithms (self-organizing maps, in order to achieve fault tolerance and enhanced resistance to previously unknown attacks. This approach has been extensively simulated and compared with previous proposals.

  20. Remote viewing optical instruments for nuclear installations [Paper No.: J8

    International Nuclear Information System (INIS)

    Das, N.C.; Koppikar, R.S.; Modi, R.K.; Radke, M.G.

    1993-01-01

    Inspection of highly radioactive components and materials in the hot cell and the reactor core requires several remote viewing and remote handling equipment, considering the safety of the operator. With this objective two wall periscopes for the hot cells of the Waste Immobilisation Project (WIP) at Tarapur , a remote viewing macrograph for the hot cell facility at Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam and a core viewing periscope for the fast breeder test reactor (FBTR), Kalpakkam has also been developed. Construction principle and the experimental performance of these instruments are discussed. The overall visual magnifications of the WIP and the FBTR periscopes are 2x and the same for the IGCAR macrograph is 20x. (author). 3 figs

  1. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  2. Desarrollo de un sistema SCADA para el abastecimineto de agua en la estación de bombeo Yuyucocha de la empresa municipal de agua potable y alcantarillado de Ibarra

    OpenAIRE

    Murillo Moreno, Darío Hernán

    2018-01-01

    The present technical project was developed in the Municipal Drinking Water and Sewerage Company of Ibarra with the purpose of developing a SCADA system for the water supply system in the Yuyucocha pumping station, using fiber optic for the connection between three wells and the control room. The SCADA system of the Yuyucocha pumping station allows the continuous monitoring and control of the equipment that is used for the administration of drinking water in the city of Ibarra. Furthermore, t...

  3. Information security in SCADA systems in nuclear power plants

    International Nuclear Information System (INIS)

    Satyamurty, S.A.V.

    2013-01-01

    Few decades back most of the I and C systems are Hardwired based. With the developments in digital electronics, micro processors and micro controllers, the I and C systems are becoming more and more Computer based. Though it brought convenience to the designer, comfort to the operator in the form of better GUI, it also brought many challenges in the form of information security. The talk covers the typical I and C design using SCADA systems, the challenges, typical problems faced and the need for information security. The talk illustrates various security measures to be implemented in the design, development and testing stages. These security measures have to be taken both in the development environment and deployment environment. Verification and validation of computer based system is very important. Configuration change management is very essential for smooth running of the plant. The talk illustrates the various measures need to be taken. (author)

  4. Toroid field coil shear key installation study, DOE task No. 22

    International Nuclear Information System (INIS)

    Jones, C.E.; Meier, R.W.; Yuen, J.L.

    1995-01-01

    Concepts for fitting and installation of the scissor keys, triangular keys, and truss keys in the ITER Toroidal Field (TF) Coil Assembly were developed and evaluated. In addition, the process of remote removal and replacement of a failed TF coil was considered. Two concepts were addressed: central solenoid installed last (Naka Option 1) and central solenoid installed first (Naka Option 2). In addition, a third concept was developed which utilized the favorable features of both concepts. A time line for installation was estimated for the Naka Option 1 concept

  5. Long Term Remote Monitoring of TCE Contaminated Groundwater at Savannah River Site

    International Nuclear Information System (INIS)

    Duran, C.; Gudavalli, R.; Lagos, L.; Tansel, B.; Varona, J.; Allen, M.

    2004-01-01

    The purpose of this study was to develop a mobile self powered remote monitoring system enhanced for field deployment at Savannah River Site (SRS). The system used a localized power source with solar recharging and has wireless data collection, analysis, transmission, and data management capabilities. The prototype was equipped with a Hydrolab's DataSonde 4a multi-sensor array package managed by a Supervisory Control and Data Acquisition (SCADA) system, with an adequate pumping capacity of water samples for sampling and analysis of Trichloroethylene (TCE) in contaminated groundwater wells at SRS. This paper focuses on a study and technology development efforts conducted at the Hemispheric Center for Environmental Technology (HCET) at Florida International University (FIU) to automate the sampling of contaminated wells with a multi-sensor array package developed using COTS (Commercial Off The shelf) parts. Bladder pumps will pump water from different wells to the sensors array, water quality TCE indicator parameters are measured (i.e. pH, redox, ORP, DO, NO3 -, Cl-). In order to increase user access and data management, the system was designed to be accessible over the Internet. Remote users can take sample readings and collect data remotely over a web. Results obtained at Florida International University in-house testing and at a field deployment at the Savannah River Site indicate that this long term monitoring technique can be a feasible solution for the sampling of TCE indicator parameters at remote contaminated sites

  6. From a UNIX to a PC Based SCADA System

    CERN Document Server

    Momal, F

    1999-01-01

    In order to facilitate the development of supervisory applications involved in slow process control (such as cryogenic control), the LHC/IAS Group (Equipment Controls Group) opted, a few years ago, for an industrial SCADA package which runs on UNIXÒ platforms. However, to reduce costs and following market trends, it has been decided to move over to a PC-based package. Several processes relating to the testing of the prototypes of the LHC magnets are already controlled in this way. However, it was still necessary to provide all the services previously available to the users, for example, data archiving in central databases, real-time access through the Web, automatic GSM calls, etc. This paper presents the advantages and drawbacks of a PC-based package versus a Unix-based system. It also lists the criteria used in the market survey to arrive at the final selection, as well as, the overall architecture, highlighting the developments needed to integrate the package into the global computing environment.

  7. Advanced remote handling developments for high radiation applications

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Feldman, M.J.; Kuban, D.P.; Martin, H.L.; Rowe, J.C.; Hamel, W.R.

    1985-01-01

    The Remote Control Engineering Task of the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, and installation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  8. Remote input/output station

    CERN Multimedia

    1972-01-01

    A general view of the remote input/output station installed in building 112 (ISR) and used for submitting jobs to the CDC 6500 and 6600. The card reader on the left and the line printer on the right are operated by programmers on a self-service basis.

  9. Actualización del sistema SCADA y de control para los reactores MQ5 y MQ6 de la planta de Pinturas Condor, Sherwin Williams Ecuador

    Directory of Open Access Journals (Sweden)

    Jonathan Reinoso

    2013-12-01

    Full Text Available El presente documento describe la actualización del sistema SCADA para los reactores MQ5 y MQ6 de la planta de Pinturas Condor mediante el software Intouch y la actualización del sistema de control del reactor MQ5 implementado en un controlador lógico programable (PLC de marca SCHNEIDER, además de la arquitectura de control realizada en el proyecto. El sistema SCADA y de control de los reactores permiten la visualización y control de los datos y variables más relevantes durante las diferentes fases de producción de resinas en los reactores MQ5 y MQ6.

  10. Freeware for GIS and Remote Sensing

    OpenAIRE

    Lena Halounová

    2007-01-01

    Education in remote sensing and GIS is based on software utilization. The software needs to be installed in computer rooms with a certain number of licenses. The commercial software equipment is therefore financially demanding and not only for universities, but especially for students. Internet research brings a long list of free software of various capabilities. The paper shows a present state of GIS, image processing and remote sensing free software.

  11. Freeware for GIS and Remote Sensing

    Directory of Open Access Journals (Sweden)

    Lena Halounová

    2007-12-01

    Full Text Available Education in remote sensing and GIS is based on software utilization. The software needs to be installed in computer rooms with a certain number of licenses. The commercial software equipment is therefore financially demanding and not only for universities, but especially for students. Internet research brings a long list of free software of various capabilities. The paper shows a present state of GIS, image processing and remote sensing free software.

  12. Closed-circuit television and remote crane control for vitrification facilities

    International Nuclear Information System (INIS)

    Bennett, P.R.; Morrison, J.E.

    1986-01-01

    The Defense Waste Processing Facility is currently under construction at the Savannah River Plant. Within the main process cell (MPC), a 117-ton capacity bridge crane is to be installed to facilitate remote handling and processing operations. E. I. du Pont de Nemours and Company defined and PRC designed and built an operational prototype closed-circuit television (CCTV) and remote control system. Phase I of the program developed the CCTV system to prove the feasibility of a remote viewing system. The phase II program added full crane functional remote control and installed it on an existing hot canyon crane. This prototype system established the criteria for the development of the MPC crane and future crane systems. Parameters were: (a) failsafe assurance, (b) high liability, (c) ease of maintenance for dressed-out personnel, (d) rapid malfunction diagnosis, (e) ergonomics, (f) known picture orientation, and (g) audio system to monitor operational sounds. The complete system has undergone a total demonstration of its operational capabilities using simulator circuits for crane functions and is now being integrated with the crane for a full operational demonstration. The system will then be mothballed pending installation by construction personnel ready for cold startup of the plant in 1988

  13. Test suite for the archiver of a SCADA system

    CERN Document Server

    Voitier, Axel

    2009-01-01

    Topic: The group responsible for providing the main control system applications for all machines at CERN has to validate that every piece of the control systems used will be reliable and fully functional when the LHC and its experiments will do collisions of particles. CERN use PVSS from ETM/Siemens for the SCADA part of its control systems. This software has a component dedicated to archive into a centralised Oracle database values and commands of tenth of thousands hardware devices. This component, named RDB, has to be tested and validated in terms of functionality and performance. The need is high for that because archiving is a critical part of the control systems. In case of an incident on one of the machine, it will be unacceptable to not benefit of archiving the machine context at this moment just because of a bug in RDB. Bugs have to be spotted and reported to ETM. Results: The proposed solution is an extensible automatic tester able to evaluate currently around 160 cases of potential bugs. Since the ...

  14. Development of remote handling technology for nuclear fuel cycle facilities in Japan

    International Nuclear Information System (INIS)

    Maekawa, Hiromichi; Sakai, Akira; Miura, Noriaki; Kozaka, Tetsuo; Hamada, Takashi

    2015-01-01

    Remote handling technology has been systematically developed for nuclear fuel cycle facilities in Japan since 1970s, primarily in parallel with the development of reprocessing and HLLW (High Level Liquid Waste) vitrification process. In case of reprocessing and vitrification process to handle highly radioactive and hazardous materials, the most of components are installed in the radiation shielded hot cells and operators are not allowed to enter the work area in the cells for operation and maintenance. Therefore, a completely remote handling system is adopted for the cells to reduce radiation doses of operators and increase the availability of the facility. The hot cells are generally designed considering the scale of components (laboratory, demonstration, or full-scale), the function of the systems (chemical process, material handling, dismantling, decontamination, or chemical analysis), and the environmental conditions (radiation dose rate, airborne concentration, surface contamination, or fume/mist/dust). Throughout our domestic development work for remote handling technology, the concept of the large scale integrated cell has been adopted rather than a number of small scale separated cells, for the reasons to reduce the total installation space and the number of remote handling equipment required for the each cell as much as possible. In our domestic remote maintenance design, several new concepts have been developed, tested, and demonstrated in the Tokai Virtrification Facility (TVF) and the Rokkasho HLLW Vitrification and Storage Facility (K-facility). Layout in the hot cells, the performance of remote handling equipment, and the structure of the in-cell components are important factors for remote maintenance design. In case of TVF (hot tests started in 1995), piping and vessels are prefabricated in the rack modules and installed in two lines on both sides of the cell. These modules are designed to be remotely replaced in the whole rack. Two overhead cranes

  15. Guidelines for safety related telecommunications systems on normally unattended fixed offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    Guidance is given on the design of telecommunications systems required for safety purposes on normally unattended offshore installations associated with oil and gas production on the United Kingdom continental shelf. The guidelines are mainly concerned with ensuring that: while the installation is unattended, its operation can be remotely monitored and controlled effectively to prevent the escalation of any abnormal situation; the installation can be safely approached when it is necessary to transfer personnel on board; persons on board, for example for inspection or maintenance activities, are safe. (UK)

  16. Papers of the PTAC wireless, telecommunications and e-business forum : using wireless, SCADA, and well data life cycle management technology to boost productivity and reduce costs in the upstream oil and gas industry

    International Nuclear Information System (INIS)

    2004-01-01

    The main focus of this forum was the use of wireless, telecommunications and e-business as a means of improving efficiency and productivity in the upstream oil and gas industry. The use of new communications technologies in asset monitoring and business performance was discussed, as well as industrial automation and wireless connectivity in conjunction with Supervisory Control and Data Acquisition (SCADA) systems. New technologies in the areas of maintenance and decision support and synergy integration were introduced. New health, safety and environmental performance tools were presented. Issues concerning secure communications and document exchange expenses were also introduced, as well as different methods of closing data gaps between joint interest partners. Specific tools and software concerning compliance management with web-based and remote field data capture technology were discussed, as well as the collection and display of well-site data using newly developed BlueGauge technology. Eleven papers were presented in this forum, of which three were catalogued separately for inclusion in this database. tabs., figs

  17. Papers of the PTAC wireless, telecommunications and e-business forum : using wireless, SCADA, and well data life cycle management technology to boost productivity and reduce costs in the upstream oil and gas industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The main focus of this forum was the use of wireless, telecommunications and e-business as a means of improving efficiency and productivity in the upstream oil and gas industry. The use of new communications technologies in asset monitoring and business performance was discussed, as well as industrial automation and wireless connectivity in conjunction with Supervisory Control and Data Acquisition (SCADA) systems. New technologies in the areas of maintenance and decision support and synergy integration were introduced. New health, safety and environmental performance tools were presented. Issues concerning secure communications and document exchange expenses were also introduced, as well as different methods of closing data gaps between joint interest partners. Specific tools and software concerning compliance management with web-based and remote field data capture technology were discussed, as well as the collection and display of well-site data using newly developed BlueGauge technology. Eleven papers were presented in this forum, of which three were catalogued separately for inclusion in this database. tabs., figs.

  18. Design, fabrication, and mockup testing in the remote maintenance development facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility at the Idaho National Engineering Laboratory was installed and used extensively for full-scale development, mockup, and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques, and remote capabilities were proven workable prior to construction. A description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF is presented

  19. Development of nuclear fuel cycle remote handling technology

    International Nuclear Information System (INIS)

    Kim, K. H.; Park, B. S.; Kim, S. H.

    2012-04-01

    This report presents the development of remote handling systems and remote equipment for use in the pyprocessing verification at the PRIDE (PyRoprocess Integrated inactive Demonstration facility). There are four areas conducted in this work. In first area, the prototypes of an engineering-scale high-throughput decladding voloxidizer which is capable of separating spent fuel rod-cuts into hulls and powder and collecting them separately, and an automatic equipment which is capable of collecting residual powder remaining on separated hulls were developed. In second area, a servo-manipulator system was developed to operate and maintain pyroprocess equipment located at the argon cell of the PRIDE in a remote manner. A servo-manipulator with dual arm that is mounted on the lower part of a bridge transporter will be installed on the ceiling of the in-cell and can travel the length of the ceiling. In third area, a digital mock-up and a remote handling evaluation mock-up were constructed to evaluate the pyroprocess equipments from the in-cell arrangements, remote operability and maintainability viewpoint before they are installed in the PRIDE. In last area, a base technology for remote automation of integrated pyroprocess was developed. The developed decladding voloxidizer and automatic equipment will be utilized in the development of a head-end process for pyroprocessing. In addition, the developed servo-manipulator will be used for remote operation and maintenance of the pyroprocess equipments in the PRIDE. The constructed digital mock-up and remote handling evaluation mock-up will be also used to verify and improve the pyroprocess equipments for the PRIDE application. Moreover, these remote technologies described above can be directly used in the PRIDE and applied for the KAPF (Korea Advanced Pyroprocess Facility) development

  20. Detection of oil spills near offshore installations using synthetic aperture radar (SAR)

    International Nuclear Information System (INIS)

    Espedal, H.A.; Johannessen, O.M.

    2000-01-01

    Remote sensing using synthetic aperture radar (SAR) is attracting increasing interest for the detection of oil spills from offshore oil installations. Three systems are already operating and three more are planned. SAR can provide high spatial resolution and is not affected by the time of day or cloud conditions. Examples of images obtained from UK and Norwegian offshore installations are shown and their interpretation are explained. SAR image analysis is used by a satellite-based oil spill monitoring service covering the Norwegian sector of the North Sea and part of the North Sea, the Norwegian Sea and the Baltic Sea. An algorithm has been developed at the Nansen Environmental and Remote Sensing Centre (NERSC) in Norway to help distinguish between oil spills, natural films, current shear zones and rain cells

  1. Conceptual design of CFETR divertor remote handling compatible structure

    International Nuclear Information System (INIS)

    Dai, Huaichu; Yao, Damao; Cao, Lei; Zhou, Zibo; Li, Lei

    2016-01-01

    Highlights: • Conceptual design for the CFETR divertor have been proposed, especially the divertor remote handling compatible structure. • The degrees of freedom of the divertor are analyzed in order to validate the design the divertor supports structure. • Besides the ITER-like scheme, a new scheme for the divertor remote handling compatible supports is proposed, that is the rack and pinion mechanism. • The installation/removel process is verified through simulation in Delmia in order to check design quality for remote handling requirements. - Abstract: Divertor is one of key components of tokamak fusion reactor. The CFETR is China Fusion Engineering Test Reactor. Its divertor will expose to tritium environment and neutron radiation. Materials of the divertor will be radioactived, and cannot be handled by personnel directly. To develop structure which compatible with robots handle for installation, maintenance and removing is required. This paper introduces a conceptual design of CFETR divertor module which compatible with remote handling end-effectors. The divertor module is confined by inner and outer support. The inner support is only confined divertor module radial, toroidal and vertical moving freedom degrees, but not confined rotating freedom degrees. The outer support is the structure that can confine rotating freedom degrees and should also be compatible with remote handling end-effectors.

  2. Conceptual design of CFETR divertor remote handling compatible structure

    Energy Technology Data Exchange (ETDEWEB)

    Dai, Huaichu, E-mail: yaodm@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); University of Science and Technology of China, Hefei (China); Yao, Damao; Cao, Lei; Zhou, Zibo; Li, Lei [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China)

    2016-11-15

    Highlights: • Conceptual design for the CFETR divertor have been proposed, especially the divertor remote handling compatible structure. • The degrees of freedom of the divertor are analyzed in order to validate the design the divertor supports structure. • Besides the ITER-like scheme, a new scheme for the divertor remote handling compatible supports is proposed, that is the rack and pinion mechanism. • The installation/removel process is verified through simulation in Delmia in order to check design quality for remote handling requirements. - Abstract: Divertor is one of key components of tokamak fusion reactor. The CFETR is China Fusion Engineering Test Reactor. Its divertor will expose to tritium environment and neutron radiation. Materials of the divertor will be radioactived, and cannot be handled by personnel directly. To develop structure which compatible with robots handle for installation, maintenance and removing is required. This paper introduces a conceptual design of CFETR divertor module which compatible with remote handling end-effectors. The divertor module is confined by inner and outer support. The inner support is only confined divertor module radial, toroidal and vertical moving freedom degrees, but not confined rotating freedom degrees. The outer support is the structure that can confine rotating freedom degrees and should also be compatible with remote handling end-effectors.

  3. Handling trolley for Argonne M8, Pye Mo 1815, Pye Heavy Duty, etc. remote manipulators

    International Nuclear Information System (INIS)

    Roussel, E.; Labiche, M.; Chevallier, E.

    1962-01-01

    The removal and installation of remote manipulators and periscopes in hot cells are delicate operations requiring a specific handling trolley. This note describes the technical specifications of such a trolley having the following advantages: occupies a minimal space when not in use, easy and efficient fastening and monitoring, smooth moving of the remote manipulators during removal or installation, trolley stability and immobility during operation, requires only two operators

  4. Design, fabrication, and mockup testing in the Remote Maintenance Development Facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility (RMDF) at the Idaho National Engineering Laboratory (INEL) was installed and used extensively for full-scale development, mockup and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques and remote capabilities were proven workable prior to construction. Presented in this paper is a description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF

  5. Pre-installation empirical testing of room shielding for high dose rate remote afterloaders

    International Nuclear Information System (INIS)

    Klein, E.E.; Grigsby, P.W.; Williamson, J.F.; Meigooni, A.S.

    1993-01-01

    PURPOSE: Many facilities are acquiring high dose rate remote afterloading units. It is economical that these units be placed in existing shielded teletherapy rooms. Scatter-radiation barriers marginally protect uncontrolled areas from a high dose rate source especially in a room that houses a non-dynamic Cobalt-60 unit. In addition the exact thickness and material composition of the barriers are unknown and therefore, a calculation technique may give misleading results. Also, it would be impossible to evaluate an entire wall barrier by taking isolated core samples in order to assist in the calculations. A quick and inexpensive measurement of dose equivalent using a rented high activity 192Ir source evaluates the barriers and locates shielding deficiencies. METHODS AND MATERIALS: We performed transmission calculations for primary and scattered radiation based on National Council on Radiation Protection and Measurements Reports 49 and 51, respectively. We then rented a high activity 21.7 Ci (8.03 x 10(11) Bq) Ir-192 source to assess our existing teletherapy room shielding for adequacy and voids. This source was placed at the proposed location for clinical high dose rate treatment and measurements were performed. RESULTS: No deficiencies were found in controlled areas surrounding the room, but large differences were found between the calculated and measured values. Our survey located a region in the uncontrolled area above the room requiring augmented shielding which was not predicted by the calculations. A canopy shield was designed to potentially augment the shielding in the ceiling direction. CONCLUSION: Pre-installation testing by measurement is an invaluable method for locating shielding deficiencies and avoiding unnecessary enhancement of shielding particularly when there is lack of information of the inherent shielding

  6. Variable acuity remote viewing system flight demonstration

    Science.gov (United States)

    Fisher, R. W.

    1983-01-01

    The Variable Acuity Remote Viewing System (VARVS), originally developed under contract to the Navy (ONR) as a laboratory brassboard, was modified for flight demonstration. The VARVS system was originally conceived as a technique which could circumvent the acuity/field of view/bandwidth tradeoffs that exists in remote viewing to provide a nearly eye limited display in both field of view (160 deg) and resolution (2 min arc) while utilizing conventional TV sensing, transmission, and display equipment. The modifications for flight demonstration consisted of modifying the sensor so it could be installed and flow in a Piper PA20 aircraft, equipped for remote control and modifying the display equipment so it could be integrated with the NASA Research RPB (RPRV) remote control cockpit.

  7. Nuclear installations: decommissioning and dismantling

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This document is a compilation of seven talks given during the 1995 EUROFORUM conference about decommissioning and dismantling of Nuclear installations in the European Community. The first two papers give a detailed description of the legal, financial and regulatory framework of decommissioning and dismantling of nuclear facilities in the European Union and a review of the currently available decommissioning techniques for inventory, disassembly, decontamination, remote operations and management of wastes. Other papers describe some legal and technical aspects of reactor and plants dismantling in UK, Germany, Spain and France. (J.S.)

  8. Challenges and solutions of implementing and supporting wind diesel applications in remote (AK) locations

    Energy Technology Data Exchange (ETDEWEB)

    Pingree, B. [Northern Power Systems, Barre, VT (United States)

    2010-07-01

    This PowerPoint presentation discussed the methods used by Northern Power Systems to install and support wind-diesel applications in remote locations in Alaska. Over 90 wind turbines have been installed in the state over the last 5 years. Drivers behind the increase in wind turbine installations include the recent energy crisis as well as the introduction of several financial incentives for renewable energy. The correct equipment is needed to overcome the technical challenges associated with wind-diesel systems in remote cold temperature areas. Multiple projects are synchronized within regions, and remote energy management software is used. Centralized power production is promoted where possible, and technicians are trained locally. The wind-diesel market has become successful in Alaska as a result of leadership, a streamline grant and permitting process, and a program that supports First Nations empowerment. Photographs of various Northern Power Systems projects in Alaska were included. tabs., figs.

  9. Separate individual control systems come together at EP2

    International Nuclear Information System (INIS)

    Podmore, A.

    1991-01-01

    At BNFL's EP2 radioactive waste encapsulation plant in the UK, eight area supervisory control and data acquisition systems (SCADAs) and one central SCADA are being installed to provide computer-controlled processing of waste drums. The individual systems are all autonomous, minimizing the effect they have on other areas of the process. At the same time, they are part of an integrated system which provides effective communication between the various areas. (author)

  10. Seeing is believing -- SpyJack system investigates field problems

    International Nuclear Information System (INIS)

    O'Meara, D.

    1998-01-01

    The SpyJack Remote Monitoring System, a stand-alone, single-site remote well monitoring system that works off its own embedded controller is described. The supervisory control and data acquisition (SCADA) unit, developed by CORE Technologies Inc., has an integrated voice/alarm system, monitoring sensors installed at remote well sites continuously 24 hours a day with a digital camera, with 300 degrees of visual confirmation capability. It can also be used as a surveillance tool against terrorism as has been shown in the case of some recent debilitating attacks on remote wells in Alberta. SpyJack monitors flow rates and pressures, pumpjack stroke rates, sucker rod temperature, load cell and engine shut-off relay, as well as ambient temperature, tank levels, and motion detection. At the office, SpyJack Well Management Interface uses nine drop-down screens to take users through the remote monitoring and control of each site. The screens include production sensors, line sensors, dyno chart, environmental/safety sensors and sensor information and set up. Currently under development is the unsolicited dial-out capability. When implemented the system will send out information at pre-determined times, such as every four hours, or at specific times during the day. Compressing images to enable speedier downloading is also being planned

  11. Technology of remote monitoring for nuclear activity monitoring

    International Nuclear Information System (INIS)

    Kwack, Ehn Ho; Kim, Jong Soo; Yoon, Wan Ki; Park, Sung Sik; Na, Won Woo; An, Jin Soo; Cha, Hong Ryul; Kim, Jung Soo

    2000-05-01

    In a view of safeguards monitoring at nuclear facilities, the monitoring is changing to remote method so that this report is described to remote monitoring(RM) applying on commercial NPP in Korea. To enhance IAEA safeguards efficiency and effectiveness, IAEA is taking into account of remote monitoring system(RMS) and testing as a field trial. IRMP(International Remote Monitoring Project) in participating many nations for development of RMS is proceeding their project such as technical exchange and research etc. In case of our country are carrying out the research relevant RM since acceptance RMS at 7th ROK-IAEA safeguards implementation review meeting. With a view to enhancement the RMS, installation location and element technology of the RM equipment are evaluated in a view of safeguards in Korea LWRs, and proposed a procedure for national inspection application through remote data evaluation from Younggwang-3 NPP. These results are large valuable to use of national inspection at time point extending installation to all Korea PWR NPP. In case of CANDU, neutron, gamma measurement and basic concept of network using optical fiber scintillating detector as remote verification method for dry storage canister are described. Also RM basic design of spent fuel transfer campaign is described that unattended RM without inspector instead of performing in participating together with IAEA and national inspector. The transfer campaign means the spent fuel storage pond to dry storage canister for about two months every year. Therefore, positively participation of IAEA strength safeguards project will be increased transparency for our nuclear activity as well as contributed to national relevant industry

  12. Technology of remote monitoring for nuclear activity monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Kwack, Ehn Ho; Kim, Jong Soo; Yoon, Wan Ki; Park, Sung Sik; Na, Won Woo; An, Jin Soo; Cha, Hong Ryul; Kim, Jung Soo

    2000-05-01

    In a view of safeguards monitoring at nuclear facilities, the monitoring is changing to remote method so that this report is described to remote monitoring(RM) applying on commercial NPP in Korea. To enhance IAEA safeguards efficiency and effectiveness, IAEA is taking into account of remote monitoring system(RMS) and testing as a field trial. IRMP(International Remote Monitoring Project) in participating many nations for development of RMS is proceeding their project such as technical exchange and research etc. In case of our country are carrying out the research relevant RM since acceptance RMS at 7th ROK-IAEA safeguards implementation review meeting. With a view to enhancement the RMS, installation location and element technology of the RM equipment are evaluated in a view of safeguards in Korea LWRs, and proposed a procedure for national inspection application through remote data evaluation from Younggwang-3 NPP. These results are large valuable to use of national inspection at time point extending installation to all Korea PWR NPP. In case of CANDU, neutron, gamma measurement and basic concept of network using optical fiber scintillating detector as remote verification method for dry storage canister are described. Also RM basic design of spent fuel transfer campaign is described that unattended RM without inspector instead of performing in participating together with IAEA and national inspector. The transfer campaign means the spent fuel storage pond to dry storage canister for about two months every year. Therefore, positively participation of IAEA strength safeguards project will be increased transparency for our nuclear activity as well as contributed to national relevant industry.

  13. The inherent weaknesses in industrial control systems devices; hacking and defending SCADA systems

    Science.gov (United States)

    Bianco, Louis J.

    The North American Electric Reliability Corporation (NERC) is about to enforce their NERC Critical Infrastructure Protection (CIP) Version Five and Six requirements on July 1st 2016. The NERC CIP requirements are a set of cyber security standards designed to protect cyber assets essential the reliable operation of the electric grid. The new Version Five and Six requirements are a major revision to the Version Three (currently enforced) requirements. The new requirements also bring substations into scope alongside Energy Control Centers. When the Version Five requirements were originally drafted they were vague, causing in depth discussions throughout the industry. The ramifications of these requirements has made owners look at their systems in depth, questioning how much money it will take to meet these requirements. Some owners saw backing down from routable networks to non-routable as a means to save money as they would be held to less requirements within the standards. Some owners saw removing routable connections as a proper security move. The purpose of this research was to uncover the inherent weaknesses in Industrial Control Systems (ICS) devices; to show how ICS devices can be hacked and figure out potential protections for these Critical Infrastructure devices. In addition, this research also aimed to validate the decision to move from External Routable connectivity to Non-Routable connectivity, as a security measure and not as a means of savings. The results reveal in order to ultimately protect Industrial Control Systems they must be removed from the Internet and all bi-directional external routable connections must be removed. Furthermore; non-routable serial connections should be utilized, and these non-routable serial connections should be encrypted on different layers of the OSI model. The research concluded that most weaknesses in SCADA systems are due to the inherent weaknesses in ICS devices and because of these weaknesses, human intervention is

  14. OPG Western Waste Management Facility

    Energy Technology Data Exchange (ETDEWEB)

    Julian, J. [Ontario Power Generation, Western Waste Management Facility, Tiverton, ON (Canada)

    2011-07-01

    The Ontario Power Generation (OPG) Western Waste Management Facility (WWMF) uses a computer based Supervisory Control and Data Acquisition (SCADA) system to monitor its facility, and control essential equipment. In 2007 the WWMF Low and Intermediate Level Waste (L&ILW) technical support section conducted a review of outstanding corrective maintenance work. Technical support divided all work on a system by system basis. One system under review was the Waste Volume Reduction Building (WVRB) control room SCADA system. Technical support worked with control maintenance staff to assess all outstanding work orders on the SCADA system. The assessment identified several deficiencies in the SCADA system. Technical support developed a corrective action plan for the SCADA system deficiencies, and in February of 2008 developed an engineering change package to correct the observed deficiencies. OPG Nuclear Waste Engineering approved the change package and the WVRB Control Room Upgrades construction project started in January of 2009. The WVRB control room upgrades construction work was completed in February of 2009. This paper provides the following information regarding the WWMF SCADA system and the 2009 WVRB Control Room Upgrades Project: A high-level explanation of SCADA system technology, and the various SCADA system components installed in the WVRB; A description of the state of the WVRB SCADA system during the work order assessment, identifying all deficiencies; A description of the new design package; A description of the construction project; and, A list of lessons learned during construction and commissioning, and a path forward for future upgrades. (author)

  15. OPG Western Waste Management Facility

    International Nuclear Information System (INIS)

    Julian, J.

    2011-01-01

    The Ontario Power Generation (OPG) Western Waste Management Facility (WWMF) uses a computer based Supervisory Control and Data Acquisition (SCADA) system to monitor its facility, and control essential equipment. In 2007 the WWMF Low and Intermediate Level Waste (L&ILW) technical support section conducted a review of outstanding corrective maintenance work. Technical support divided all work on a system by system basis. One system under review was the Waste Volume Reduction Building (WVRB) control room SCADA system. Technical support worked with control maintenance staff to assess all outstanding work orders on the SCADA system. The assessment identified several deficiencies in the SCADA system. Technical support developed a corrective action plan for the SCADA system deficiencies, and in February of 2008 developed an engineering change package to correct the observed deficiencies. OPG Nuclear Waste Engineering approved the change package and the WVRB Control Room Upgrades construction project started in January of 2009. The WVRB control room upgrades construction work was completed in February of 2009. This paper provides the following information regarding the WWMF SCADA system and the 2009 WVRB Control Room Upgrades Project: A high-level explanation of SCADA system technology, and the various SCADA system components installed in the WVRB; A description of the state of the WVRB SCADA system during the work order assessment, identifying all deficiencies; A description of the new design package; A description of the construction project; and, A list of lessons learned during construction and commissioning, and a path forward for future upgrades. (author)

  16. Protecting worker health and safety using remote handling systems

    International Nuclear Information System (INIS)

    Dennison, D.K.; Merrill, R.D.; Reed, R.K.

    1995-03-01

    Lawrence Livermore National Laboratory (LLNL) is currently developing and installing two large-scale, remotely controlled systems for use in improving worker health and safety by minimizing exposure to hazardous and radioactive materials. The first system is a full-scale liquid feed system for use in delivering chemical reagents to LLNL's existing aqueous low-level radioactive and mixed waste treatment facility (Tank Farm). The Tank Farm facility is used to remove radioactive and toxic materials in aqueous wastes prior to discharge to the City of Livermore Water Reclamation Plant (LWRP), in accordance with established discharge limits. Installation of this new reagent feed system improves operational safety and process efficiency by eliminating the need to manually handle reagents used in the treatment processes. This was done by installing a system that can inject precisely metered amounts of various reagents into the treatment tanks and can be controlled either remotely or locally via a programmable logic controller (PLC). The second system uses a robotic manipulator to remotely handle, characterize, process, sort, and repackage hazardous wastes containing tritium. This system uses an IBM-developed gantry robot mounted within a special glove box enclosure designed to isolate tritiated wastes from system operators and minimize the potential for release of tritium to the atmosphere. Tritiated waste handling is performed remotely, using the robot in a teleoperational mode for one-of-a-kind functions and in an autonomous mode for repetitive operations. The system is compatible with an existing portable gas cleanup unit designed to capture any gas-phase tritium inadvertently released into the glove box during waste handling

  17. Remote operations in a Fusion Engineering Research Facility (FERF)

    International Nuclear Information System (INIS)

    Doggett, J.N.

    1975-01-01

    The proposed Fusion Engineering Research Facility (FERF) has been designed for the test and evaluation of materials that will be exposed to the hostile radiation environment created by fusion reactors. Because the FERF itself must create a very hostile radiation environment, extensive remote handling procedures will be required as part of its routine operations as well as for both scheduled and unscheduled maintenance. This report analyzes the remote-handling implications of a vertical- rather than horizontal-orientation of the FERF magnet, describes the specific remote-handling facilities of the proposed FERF installation and compares the FERF remote-handling system with several other existing and proposed facilities. (U.S.)

  18. A Mobile Remote Lab System to Monitor in Situ Thermal Solar Installations

    Directory of Open Access Journals (Sweden)

    Gastón Saez de Arregui

    2013-01-01

    Full Text Available In this paper we describe the design and development of interconnected devices which allow monitoring in situ the performance of solar boilers. This mobile remote lab system comprises two huge blocks of hardware: a mobile station located by the boiler, which is monitored and controlled in a remote way, and a fixed station, located in the Laboratory of Energy for the Sustained Development of the Universidad Nacional de Rosario. The communication between the fixed and mobile devices is controlled by microcontrollers included in both stations and programmed in C language. The project is being developed through three parallel lines of work: 1 Design and development of fixed and mobile hardware; 2 Development of firmware and software necessary to register and communicate data; 3 Design and development of learning activities. This mobile remote lab will be useful to test the behavior of solar boilers in the place and environmental conditions where they are placed so as to evaluate their performance and efficiency anywhere. This is also in order to contribute for the implementation of norms for the certification of solar boilers. On the other hand, the data and results obtained from the development will be used as supplies for the design of learning activities

  19. A remote control room at DIII-D

    International Nuclear Information System (INIS)

    Abla, G.; Schissel, D.P.; Penaflor, B.G.; Wallace, G.

    2008-01-01

    This paper describes a remote control room built at DIII-D to support remote participation activities of DIII-D research staff. In order to create a persistent, efficient, and reliable remote participation environment for DIII-D scientists, a remote control room has been built in a 640-ft 2 dedicated area. The purpose of this room is to experiment and define a remote control room framework that can facilitate the remote participation needs of current and future fusion experiments such as ITER. A variety of hardware equipment has been installed and several remote participation and collaboration technologies have been deployed. Objectivity and practical consideration has been the key while designing the room and deploying the technologies. Although, the DIII-D remote control room is still a work in progress and new software tools are being implemented, it has been already useful for a number of international remote participation activities. For example, it has been used for remote support of the EAST Tokamak in China during the start up operation and proven effective for other collaborative experiment activities. The description of the remote control room design is given along with technologies deployed for remote collaboration needs. We will also discuss our recent experiences involving the DIII-D remote control room as well as future plans for improvements

  20. Satellite Remote Sensing in Offshore Wind Energy

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Badger, Merete; Astrup, Poul

    2013-01-01

    Satellite remote sensing of ocean surface winds are presented with focus on wind energy applications. The history on operational and research-based satellite ocean wind mapping is briefly described for passive microwave, scatterometer and synthetic aperture radar (SAR). Currently 6 GW installed...

  1. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  2. Application of remote handling compatibility on ITER plant

    International Nuclear Information System (INIS)

    Sanders, S.; Rolfe, A.; Mills, S.F.; Tesini, A.

    2011-01-01

    The ITER plant will require fully remote maintenance during its operational life. For this to be effective, safe and efficient the plant will have to be developed in accordance with remote handling (RH) compatibility requirements. A system for ensuring RH compatibility on plant designed for Tokamaks was successfully developed and applied, inter alia, by the authors when working at the JET project. The experience gained in assuring RH compatibility of plant at JET is now being applied to RH relevant ITER plant. The methodologies required to ensure RH compatibility of plant include the standardization of common plant items, standardization of RH features, availability of common guidance on RH best practice and a protocol for design and interface review and approval. The protocol in use at ITER is covered by the ITER Remote Maintenance Management System (IRMMS) defines the processes and utilization of management controls including Plant Definition Forms (PDF), Task Definition Forms (TDFs) and RH Compatibility Assessment Forms (RHCA) and the ITER RH Code of Practice. This paper will describe specific examples where the authors have applied the methodology proven at JET to ensure remote handling compatibility on ITER plant. Examples studied are: ·ELM coils (to be installed in-vessel behind the Blanket Modules) - handling both in-vessel, in Casks and at the Hot Cell as well as fully remote installation and connection (mechanical and electrical) in-vessel. ·Neutral beam systems (in-vessel and in the NB Cell) - beam sources, cesium oven, beam line components (accessed in the NB Cell) and Duct Liner (remotely replaced from in-vessel). ·Divertor (in-vessel) - cooling pipe work and remotely operated electrical connector. The RH compatibility process can significantly affect plant design. This paper should therefore be of interest to all parties who develop ITER plant designs.

  3. Modeling DNP3 Traffic Characteristics of Field Devices in SCADA Systems of the Smart Grid

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Huan [Lehigh Univ., Bethlehem, PA (United States); Cheng, Liang [Lehigh Univ., Bethlehem, PA (United States); Chuah, Mooi Choo [Lehigh Univ., Bethlehem, PA (United States)

    2017-03-08

    In the generation, transmission, and distribution sectors of the smart grid, intelligence of field devices is realized by programmable logic controllers (PLCs). Many smart-grid subsystems are essentially cyber-physical energy systems (CPES): For instance, the power system process (i.e., the physical part) within a substation is monitored and controlled by a SCADA network with hosts running miscellaneous applications (i.e., the cyber part). To study the interactions between the cyber and physical components of a CPES, several co-simulation platforms have been proposed. However, the network simulators/emulators of these platforms do not include a detailed traffic model that takes into account the impacts of the execution model of PLCs on traffic characteristics. As a result, network traces generated by co-simulation only reveal the impacts of the physical process on the contents of the traffic generated by SCADA hosts, whereas the distinction between PLCs and computing nodes (e.g., a hardened computer running a process visualization application) has been overlooked. To generate realistic network traces using co-simulation for the design and evaluation of applications relying on accurate traffic profiles, it is necessary to establish a traffic model for PLCs. In this work, we propose a parameterized model for PLCs that can be incorporated into existing co-simulation platforms. We focus on the DNP3 subsystem of slave PLCs, which automates the processing of packets from the DNP3 master. To validate our approach, we extract model parameters from both the configuration and network traces of real PLCs. Simulated network traces are generated and compared against those from PLCs. Our evaluation shows that our proposed model captures the essential traffic characteristics of DNP3 slave PLCs, which can be used to extend existing co-simulation platforms and gain further insights into the behaviors of CPES.

  4. Decontamination and remote dismantling tests in the Itrec reprocessing plant

    International Nuclear Information System (INIS)

    Candelieri, T.; Gerardi, A.; Soffietto, G.

    1993-01-01

    The scope of this research is to evaluate the advantages of the rack removal system in the dismantling of reprocessing installations. The objective of this work is to verify experimentally the possibility of the decontamination of any particular module and the capability of the remote dismantling of components installed in the mobile rack. In particular, the main objective is to develop remotely operated equipment for the dismantling of centrifugal contactors. The decontamination of the equipment which represents the most important preliminary phase of the decommissioning operation, allowed to obtain low-level radioactivity. A supporting programme has been performed in order to collect sufficient data for the project and design of the remote dismantling machine. On the basis of technological cold test results, the project of the dismantling machine's construction has been optimized. Positive results obtained during the hot dismantling operations on the Rack 6 bis attested the effectiveness of the rack removal system as an original design which facilitates decommissioning of reprocessing plants. 2 tabs., 18 figs

  5. Replacement of five main block valves without interruption of normal operation in a remote NGL station placed at 13400 FT AMSL, challenge and strategies

    Energy Technology Data Exchange (ETDEWEB)

    Quinto, Yamil; Morales, Raul; Elorreaga, Gerson [Compania Operadora del Gas del Amazonas, Lima (Peru)

    2012-07-01

    The present paper is aimed to share experience of the replacement of five block valves carried on in a pressure reduction station remotely operated and located in a remote area in The Andes of Peru at 13400 ft AMSL. To accomplish the job, it was necessary the construction of a temporary bypass made of carbon steel pipeline with its own regulating, instrumentation and automation facilities, hence capable of reduce the NGL pressure, controlled and remotely operated by a SCADA system. The temporary bypass connection and disconnection to put on service was carried out using Hot Tap and Line Stop equipment. The replacement of the five block valves was met without interruption of the hydrocarbons flow, and resetting the pressure reduction station to steady operating conditions. Besides the operating works these activities involve safety considerations for personal working in high altitudes. The outputs were the successful replacements of the block valves, and most important was that the NGL continuous flow was met, so both the production and processing plants were supplied with the daily transportation rates in standard conditions, and in accordance with the requirements of the plant operation. (author)

  6. Development of nuclear fuel cycle remote handling technology

    International Nuclear Information System (INIS)

    Kim, K. H.; Park, B. S.; Kim, S. H.

    2010-04-01

    This report presents the development of remote handling systems and remote equipment for use in the pyprocessing verification at the PRIDE (PyRoprocess Integrated inactive Demonstration facility). There are three areas conducted in this work. In first area, developed were the prototypes of an engineering-scale high-throughput decladding voloxidizer which is capable of separating spent fuel rod-cuts into hulls and powder and collecting them separately and an automatic equipment which is capable of collecting residual powder remaining on separated hulls. In second area, a servo-manipulator prototype was developed to operate and maintain pyroprocess equipment located at the argon cell of the PRIDE in a remote manner. A servo-manipulator with dual arm that is mounted on the lower part of a bridge transporter will be installed on the ceiling of the in-cell and can travel the length of the ceiling. In last area, a simulator was developed to simulate and evaluate the design developments of the pyroprocess equipment from the in-cell arrangements, remote operability and maintainability viewpoint in a virtual process environment in advance before they are constructed. The developed decladding voloxidizer and automatic equipment will be utilized in the development of a head-end process for pyroprocessing. In addition, the developed servo-manipulator will be installed in the PRIDE and used for remote operation and maintenance of the pyroprocess equipment. The developed simulator will be also used to verify and improve the design of the pyroprocess equipment for the PRIDE application. Moreover, these remote technologies described above can be directly used in the PRIDE and applied for the ESPF (Engineering Scale Pyroprocess Facility) and KAPF (Korea Advanced Pyroprocess Facility) development

  7. Very Portable Remote Automatic Weather Stations

    Science.gov (United States)

    John R. Warren

    1987-01-01

    Remote Automatic Weather Stations (RAWS) were introduced to Forest Service and Bureau of Land Management field units in 1978 following development, test, and evaluation activities conducted jointly by the two agencies. The original configuration was designed for semi-permanent installation. Subsequently, a need for a more portable RAWS was expressed, and one was...

  8. Preparing and Managing the Remote Experiment in Education

    Directory of Open Access Journals (Sweden)

    Tomáš Kozík

    2013-02-01

    Full Text Available Remote laboratories have become a real fact in recent years not only at technical universities, but also at lower educational levels. The use of such technology in education is not associated only with the advantages. The attention of pedagogical research is necessary to focus also to some specific problems, pitfalls and risks that occur as a side effect. The development and operation of remote laboratories requires certain resources. Some experiments are able to run fully automatically, others require constant human interference on the spot. What has been overlooked the developers and users of remote experiments was the question how to manage the long-term operation, reliability and innovation of the remote real experiments installed at remote laboratories. In remote experiments, students, consciously or unconsciously, are trying the limit parameters of the experiment. Although such behaviour is important in terms of education, safety of the facilities must be taken into account.

  9. Criteria for remote shutdown for light water reactors

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    This Standard provides design criteria which require that: (1) specific controls and monitoring equipment shall be provided for achieving and maintaining the plant in a safe shutdown condition; (2) these controls be installed at a location (or locations) that is physically remote from the control room and cable spreading areas; (3) simultaneous control from both locations shall be prevented by administrative controls or devices for transfer of control from the control room to the remote location(s); and (4) the remote controls be used as defense-in-depth measure in addition to the control room shutdown controls and as a minimum shall provide for one complete channel of shutdown equipment

  10. LHC-GCS a model-driven approach for automatic PLC and SCADA code generation

    CERN Document Server

    Thomas, Geraldine; Barillère, Renaud; Cabaret, Sebastien; Kulman, Nikolay; Pons, Xavier; Rochez, Jacques

    2005-01-01

    The LHC experiments’ Gas Control System (LHC GCS) project [1] aims to provide the four LHC experiments (ALICE, ATLAS, CMS and LHCb) with control for their 23 gas systems. To ease the production and maintenance of 23 control systems, a model-driven approach has been adopted to generate automatically the code for the Programmable Logic Controllers (PLCs) and for the Supervision Control And Data Acquisition (SCADA) systems. The first milestones of the project have been achieved. The LHC GCS framework [4] and the generation tools have been produced. A first control application has actually been generated and is in production, and a second is in preparation. This paper describes the principle and the architecture of the model-driven solution. It will in particular detail how the model-driven solution fits with the LHC GCS framework and with the UNICOS [5] data-driven tools.

  11. Tolerancing requirements for remote handling at the Hanford vitrification project

    International Nuclear Information System (INIS)

    Keenan, R.M.; Bullis, R.E.; Van Katwijk, C.

    1993-01-01

    The Hanford Waste Vitrification Plant is being designed by Fluor Daniel, Inc. with WasteChem Corporation as Fluor Daniel's major subcontractor specializing in vitrification and remote system technologies. United Engineers and Constructors/Catalytic (UE ampersand C) will construct the plant. Westinghouse Hanford Company (WHC) is the Project Integration manager, manager and as the plant operator provides technical direction to the Architect/Engineer team (A/E) and constructor on behalf of the Department of Energy - Richland Field Office. The A/E has developed, in cooperation with UE ampersand C, WHC and DOE, a new and innovative approach to installations of the many remote nozzles and electrical connectors that must be installed to demanding tolerances. This paper summarizes the key elements of the HWVP approach

  12. Development of remote disassembly technology for liquid-metal reactor (LMR) fuel

    International Nuclear Information System (INIS)

    Bradley, E.C.; Evans, J.H.; Metz, C.F. III; Weil, B.S.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program (CFRP) is to develop equipment and demonstrate technology to reprocess fast breeder reactor fuel. Experimental work on fuel disassembly cutting methods began in the 1970s. High-power laser cutting was selected as the preferred cutting method for fuel disassembly. Remotely operated development equipment was designed, fabricated, installed, and tested at Oak Ridge National Laboratory (ORNL). Development testing included remote automatic operation, remote maintenance testing, and laser cutting process development. This paper summarizes the development work performed at ORNL on remote fuel disassembly. 2 refs., 1 fig

  13. Remote control systems for water distribution networks. Effective operation, quality service and customer satisfaction; Il telecontrollo delle reti idriche. Efficienza gestionale, qualita' del servizio e soddisfazione del cliente

    Energy Technology Data Exchange (ETDEWEB)

    Cascetta, F. [Naples Univ. Federico 2., Naples (Italy). Geographic information Systems and Agriculture

    2000-10-01

    The needs of the present Italian marketplace of public utilities drive towards new and more adequate management standards. The main aims of a water Company are very similar to those of any industrial enterprise, i.e. to increase its productivity and to reduce the relative production costs. This modern and rigorous approach of the management of a public utility implies a careful process control. Network facilities (such as water, gas or energy supply) require a flexible and powerful application of the information technology, such as Supervisory Control and Data Acquisition systems (SCADA), as well as Geographical Information Systems (GIS). This paper illustrates a survey on the main benefits introduced by a remote supervisory and control system in water industry. [Italian] In questo lavoro vengono presentate le notevoli potenzialita' degli attuali sistemi di telecontrollo e di supervisione (SCADA) di reti geograficamente distribuite, soprattutto se questi vengono integrati con le tecnologie informatiche territoriali (S.I.T. o GIS). Vengono inoltre definiti e illustrati gli indicatori di prestazione, cosi' utili per una moderna e flessibile gestione del ciclo idrico integrato. Infine, viene delineato un approccio quantitativo per la valutazione dell'efficienza, efficacia ed economicita' della gestione del servizio idrico di pubblica utilita'.

  14. Remote Infrared Audible Signage (RIAS) Pilot Program : evaluation report

    Science.gov (United States)

    2009-09-01

    This report presents evaluation findings on the Remote Infrared Audible Signage (RIAS) Pilot Program in the Puget Sound Region of Washington. The installation, demonstration and evaluation of RIAS were required by a provision in the Safe, Accountable...

  15. A web-based remote radiation treatment planning system using the remote desktop function of a computer operating system: a preliminary report.

    Science.gov (United States)

    Suzuki, Keishiro; Hirasawa, Yukinori; Yaegashi, Yuji; Miyamoto, Hideki; Shirato, Hiroki

    2009-01-01

    We developed a web-based, remote radiation treatment planning system which allowed staff at an affiliated hospital to obtain support from a fully staffed central institution. Network security was based on a firewall and a virtual private network (VPN). Client computers were installed at a cancer centre, at a university hospital and at a staff home. We remotely operated the treatment planning computer using the Remote Desktop function built in to the Windows operating system. Except for the initial setup of the VPN router, no special knowledge was needed to operate the remote radiation treatment planning system. There was a time lag that seemed to depend on the volume of data traffic on the Internet, but it did not affect smooth operation. The initial cost and running cost of the system were reasonable.

  16. Système de Construction Automatisé d'Archives d'Installation

    CERN Document Server

    Vessière, Damien

    In order to optimize people's time in charge of asset computer management, I created Python software able to automate the creation of install archives on various LHCb’s computer in use. To conduct this realization, I had access to different servers and virtual machines at CERN and on my own workstation. The handling of these machines was performed by the "libvirt" library in python and has many modules like "pyGTK" for the graphical user interface. With my software it is now possible to run commands on remote systems to create installer and finally bring them back on the workstation.

  17. Advantage of redundancy in the controllability of remote handling manipulator

    International Nuclear Information System (INIS)

    Muhammad, Ali; Mattila, Jouni; Vilenius, Matti; Siuko, Mikko; Semeraro, Luigi

    2011-01-01

    To carry out a variety of remote handling operations inside the ITER divertor a Water Hydraulic MANipulator (WHMAN) and its control system have been designed and developed at Tampere University of Technology. The manipulator is installed on top of Cassette Multifunctional Mover (CMM) to assist during the cassette removal and installation operations. While CMM is designed to carry heavy components such as cassettes through the service ducts relying on positioning accuracy and repeatability, WHMAN is designed to execute a mix of remote handling operations using position trajectories and master-slave telemanipulation. WHMAN is composed of eight joints: six rotational and two translational. Since a manipulator requires only six joints to acquire the desired position and orientation in operational-space, the two additional joints of WHMAN provide the redundant degrees of mobility. This paper presents how this redundancy of WHMAN can be an advantage to optimize the execution of remote handling tasks. The paper also discusses an effective way to practically exploit the redundancy. The results show that the additional degrees of freedom can be utilized to improve the dynamic behavior of the manipulator.

  18. Remote monitoring technical review for light water reactors (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Park, Seung Sik; Yoon, Wan Ki; Na, Won Woo; Kwack, Eun Ho [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-10-01

    The IAEA has been conducting a field trial of a Remote Monitoring System (RMS) at the spent fuel storage, Younggwang 3 nuclear power plant. The system installation plan was initiated after the agreement in the 7th ROK-IAEA safeguards Implementation Review Meeting that was held in Soul, 1998. It describes that IAEA and Korea proceed RM tasks Implementation of RMS at LWRs in the ROK for field trials. The project of RMS is conducting through 3 stages with timing. RMS has been installed for the Phase I of field trial, one of two stages at Younggwang Unit 3 in October 1998. The RMS consists of video systems and a seal at the spent fuel pond area. This report provides a description of the monitoring system and its functions focusing on several technical points of the installation and its 6 month operation at Younggwang Unit 3. Subjects are selected and analyzed in the three chapters, IAEA safeguards policy on Remote Monitoring, the technology, and field test experiences. 8 refs., 12 figs., 12 tabs. (Author)

  19. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  20. Data analysis for remote monitoring of safeguarded facilities

    International Nuclear Information System (INIS)

    DeLand, S.M.

    1997-01-01

    The International Remote Monitoring Project (IRMP) sponsored by the US DOE allows DOE and its international partners to gain experience with the remote collection, transmission, and interpretation of safeguards-relevant data. This paper focuses on the interpretation of the data from these remote monitoring systems. Users of these systems need to be able to ascertain that the remote monitoring system is functioning as expected and that the events generated by the sensors are consistent with declared activity. The initial set of analytical tools being provided for IRMP installations this year include a suite of automatically generated views of user-selected data. The baseline set of tools, with illustrative examples, will be discussed. Plans for near-term enhancements will also be discussed. Finally, the applicability of more advanced analytical techniques such as expert systems will be discussed

  1. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  2. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  3. Online remote radiological monitoring during operation of Advance Vitrification System (AVS), Tarapur

    International Nuclear Information System (INIS)

    Deokar, U.V.; Kulkarni, V.V.; Mathew, P.; Khot, A.R.; Singh, K.K.; Kamlesh; Deshpande, M.D.; Kulkarni, Y.

    2010-01-01

    Advanced Vitrification System (AVS) is commissioned for vitrification of high level waste (HLW) by using Joule heated ceramic melter first time in India. The HLW is generated in fuel reprocessing plant. For radiological surveillance of plant, Health Physics Unit (HPU) had installed 37 Area Gamma Monitors (AGM), 7 Continuous Air Monitors (CAM) and all types of personal contamination monitors. Exposure control is a major concern in operating plant. Therefore in addition to installed monitors, we have developed online remote radiation monitoring system to minimize exposures to the surveyor and operator. This also helped in volume reduction of secondary waste. The reliability and accuracy of the online monitoring system is confirmed by calibrating the system by comparing TLD and DRD readings and by theoretical analysis. In addition some modifications were carried in HP instruments to make them user friendly. This paper summarizes different kinds of remote radiological monitoring systems installed for online monitoring of Melter off Gas (MOG) filter, Hood filter, three exhaust filter banks, annulus air sampling and over pack monitoring in AVS. Our online remote monitoring system has helped the plant management to plan in advance for replacement of these filters, which resulted in considerable saving of collective dose. (author)

  4. A remote joint system for large vacuum ducts

    International Nuclear Information System (INIS)

    Hagmann, D.B.; Coughlan, J.B.

    1983-01-01

    A large remote vacuum duct joining system has been developed for fusion machines that uses several two-jaw screwdriven clamps. The preferred location for clamp installation is inside the vacuum duct where access space is available for the actuating device. It also decreases space needed for handling operations exterior to the duct. The clamp system is unique in that it is low cost, applies force directly over the seal, permits leak testing to the seal annulus, is highly reliable, can be remotely replaced, and is usable on a variety of other applications

  5. Localization of cask and plug remote handling system in ITER using multiple video cameras

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, João, E-mail: jftferreira@ipfn.ist.utl.pt [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Vale, Alberto [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ribeiro, Isabel [Laboratório de Robótica e Sistemas em Engenharia e Ciência - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2013-10-15

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building.

  6. Localization of cask and plug remote handling system in ITER using multiple video cameras

    International Nuclear Information System (INIS)

    Ferreira, João; Vale, Alberto; Ribeiro, Isabel

    2013-01-01

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building

  7. Remote application of an oscillatory system for density measurements

    International Nuclear Information System (INIS)

    Fortsch, E.M.; Wade, M.A.

    1974-01-01

    An Anton-Paar densimeter was modified for remote use and installed in the Remote Analytical Facility of the Idaho Chemical Processing Plant. This instrument determines density by measuring the deviation in resonant frequency of a hollow-glass mechanical oscillator when filled with sample material. The volume of the oscillator is constant and any change in its frequency is due to the sample. The change in frequency is a measure of the mass of the sample. Since there is no need to measure either volume or mass, the remote manipulations are simplified. This unit replaced existing falling-drop equipment with a reduction in cost and improvement of precision. The remote unit is used routinely 24 h a day with a precision of better than +- 5 x 10 -4 g/ml

  8. Remote monitoring in international safeguards

    International Nuclear Information System (INIS)

    Dupree, S.A.; Sonnier, C.S.; Johnson, C.S.

    1996-01-01

    In recent years, technology that permits the integration of monitoring sensors and instruments into a coherent network has become available. Such integrated monitoring systems provide a means for the automatic collection and assessment of sensor signals and instrument readings and for processing such signals and readings in near real time. To gain experience with the new monitoring system technology, the US Department of energy, through bilateral agreements with its international partners, has initiated a project to emplace demonstration systems in various nuclear facilities and conduct field trials of the technology. This effort is the International Remote Monitoring Project. Under this project, remote monitoring systems are being deployed around the world in an incremental manner. Each deployment is different and each offers lessons for improving the performance and flexibility of the technology. Few problems were encountered with the operation of the installations to date, and much has been learned about the operation and use of the new technology. In the future, the authors believe systems for safeguards applications should be capable of being monitored remotely, emphasize the use of sensors, and utilize selective triggering for recording of images. Remote monitoring across national borders can occur only in the context of a cooperative, nonadversarial implementation regime. However, significant technical and policy work remains to be done before widespread safeguards implementation of remote monitoring should be considered. This paper shows that an abundance of technology supports the implementation of integrated and remote monitoring systems. Current field trials of remote monitoring systems are providing practical data and operational experience to aid in the design of tomorrow's systems

  9. Experience of remote under water handling operations at Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Agarwal, S.K.

    1990-01-01

    Each Refuelling outage of Tarapur Atomic Power Station Reactors involves a great deal of remote underwater handling operations using special remote handling tools, working deep down in the reactor vessel under about sixty feet of water and in the narrow confines of highly radioactive core. The remote underwater handling operations include incore and out of core sipping operations, fuel reloading or shuffling, uncoupling of control rod drives, replacement and shuffling of control blades, replacement of local power range monitors, spent fuel shipment in casks, retrieval of fallen or displaced fuel top guide spacers, orifices and their installation, underwater CCTV inspection of reactor internals, core verification, channelling and dechannelling of fuel bundles, inspection of fuel bundles and channels, unbolting and removal of old racks, installation of high density racks, removal and reinstallation of fuel support plugs and guide tubes, underwater cutting of irradiated hardware material and their disposal, fuel reconstitution, removal and reinstallation of system dryer separator etc.. The paper describes in brief the salient experience of remote underwater handling operations at TAPS especially the unusual problems faced and solved, by using special tools, employing specific techniques and by repeated efforts, patience, ingenuity and skills. (author). 10 figs

  10. Neutron degradation of UV enhanced optical fibers for fusion installation plasma diagnostics

    International Nuclear Information System (INIS)

    Sporea, D.; Vata, I.; Dudu, D.; Danis, Ana

    2004-01-01

    The remote diagnostics of plasmas in fusion installations requires adequate connection links to transfer the measured signals in media subjected to high electromagnetic disturbances. We evaluated the neutron irradiation induced optical absorption in several commercially available optical fibers, as they were assessed for their possible use in fusion installations. Optical fiber samples were subjected to subsequent irradiation with fluences from 6 x 10 11 to 6 x 10 13 n/cm 2 . Significant radiation induced absorption was observed in the 220-260 nm spectral band, mainly for small core diameter optical fibers (200/220 μm), independent of the cladding material used

  11. Provisional acceptance of installations and online data submission of PV and Hybrid kits in remote areas of Latin-America under the EC's EURO-SOLAR Programme

    Energy Technology Data Exchange (ETDEWEB)

    Cendagorta, M.; Rodriguez, J.; Lopez-Manzanares, L.; Linares, A. [Instituto Tecnologico y de Energias Renovables, S.A. (ITER), Granadilla de Abona (Spain)

    2010-07-01

    The EURO-SOLAR Programme is providing 600 isolated and rural communities in the 8 lesser developed countries in Latin America, with an electricity production facility based on both PV or Hybrid (PV and Wind) RE technologies. These installations are meant to provide this energy for community uses, rather than home and private usage, with these uses (computing, telecommunications, lighting, water purification, etc.) aimed to increase the degree of development within the communities. Two different companies were awarded the installation of these systems, after an international tender procedure, where ITER played a technical advisor role for the EC's DG EuropeAid. In the present phase of the project, where the systems are being installed, ITER has designed a provisional acceptance procedure (PA), in which both remote and in-situ verifications are carried out. This procedure has been developed in conjunction with a web application in order to ensure both transparency and traceability either of all actions and all actors involved in the process (Companies, ITER, Technical Assistance, EC, Communities). This application is also meant to act as a central repository where all the technical and administrative information of each one of the 600 systems could be found. This paper describes in detail this procedure, how it has been designed and what are the outcomes of all the processes aimed to guarantee the technical quality and the sustainability of the systems. (orig.)

  12. IAEA perspective on remote monitoring development and implementation

    International Nuclear Information System (INIS)

    Aparo, Massimo

    2006-01-01

    The IAEA has made rapid progress in exploiting remote monitoring in 84 systems and 302 cameras, which are spread over 15 states and Taiwan. The increased use, since 2003, of remote monitoring of VACOSS electronic seals is a new feature. Successful use of remote monitoring to spot potential breakdowns through state-of-health diagnostics on 14 occasions is also an important motivation for further implementation. This paper gave detailed descriptions of installed systems for data acquisition and transmission, particularly the SDIS (up to six cameras) and DMOS (up to 16 cameras). IAEA policy for data security and data sharing raise important issues that are relevant to cooperation in transparency that might be based on sharing of data from safeguards systems. Implementation of new remote monitoring systems may utilize satellite links, as under testing now in cooperation between the IAEA and the European Space Agency (ESA). (author)

  13. Remote Control of TJ-II Diagnostics

    International Nuclear Information System (INIS)

    Lopez Sanchez, A.; Vega, J.; Montoro, A.; Encabo, J.

    2001-01-01

    The present paper is about the design and development of ten remote control diagnostic systems used in the study of plasma fusion in the TJ-II device installed at CIEMAT. This development goes from the definition of sensors and devices necessary in carrying out these remote controls, to its assembly, wiring, development of electronic circuits inserted between sensors and PLC, development of programs for these PLC, connections and administration of the real time automation network, and later development of the necessary programs via the appropriate software tools for web access through a navigator to a specific web page, allowing visual and real time access over the auxiliary systems that make up all the diagnostics. (Author)

  14. Development of a remotely maintainable radio-frequency module for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Snider, J.D.

    1988-01-01

    The Compact Ignition Tokamak (CIT) will require reliable remote handling (RH) systems to overcome failures in diagnostic and operational equipment. Oak Ridge National laboratory (ORNL) is responsible for the ex-vessel remote maintenance systems for the CIT. Part of this effort is performing remote maintenance demonstrations on replicas of various CIT equipment. To ensure successful RH, the machine must be designed with proven remote maintenance features. In the demonstrations, critical remote maintenance features are tested before actual CIT equipment designs are finalized. Designs and procedures required to remotely remove and install a radio-frequency (rf) module from a modplane port on the tokamak were recently demonstrated at ORNL. This testing identified both successful design features for remote maintenance of the rf module and areas that require further development. 1 ref., 11 figs

  15. PNC/DOE Remote Monitoring Project at Japan's Joyo Facility

    International Nuclear Information System (INIS)

    Ross, M.; Hashimoto, Yu; Sonnier, C.; Dupree, S.; Ystesund, K.; Hale, W.

    1996-01-01

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan and the US Department of Energy (DOE) are cooperating on the development of a remote monitoring system for nuclear nonproliferation efforts. This cooperation is part of a broader safeguards agreement between PNC and DOE. A remote monitoring system is being installed in a spent fuel storage area at PNC's experimental reactor facility Joyo in Oarai. The system has been designed by Sandia National Laboratories (SNL) and is closely related to those used in other SNL remote monitoring projects. The Joyo project will particularly study the unique aspects of remote monitoring in contribution to nuclear nonproliferation. The project will also test and evaluate the fundamental design and implementation of the remote monitoring system in its application to regional and international safeguards efficiency. This paper will present a short history of the cooperation, the details of the monitoring system and a general schedule of activities

  16. Application of network technology to Remote Monitoring System

    International Nuclear Information System (INIS)

    Johnson, C.S.; Sorokowski, D.L.; Veevers, K.

    1994-01-01

    The Australian Safeguards Office (ASO) and the US Department of Energy (DOE) have sponsored work under a bilateral agreement to implement a Remote Monitoring System (RMS) at an Australian nuclear site operated by the Australian Nuclear Science and Technology Organization (ANSTO). The RMS, designed by Sandia National Laboratories (SNL), was installed in February 1994 at the Dry Spent Fuel Storage Facility (DSFSF) located at Lucas Heights, Australia. The RMS was designed to test a number of different concepts that would be useful for unattended remote monitoring activities. The DSFSF located in Building 27 is a very suitable test site for a RMS. The RMS uses a network of low cost nodes to collect data from a number of different sensors and security devices. Different sensors and detection devices have been installed to study how they can be used to complement each other for C/S applications. The data collected from the network will allow a comparison of how the various types of sensors perform under the same set of conditions. A video system using digital compression collects digital images and stores them on a hard drive and a digital optical disk. Data and images from the storage area are remotely monitored via telephone from Canberra, Australia and Albuquerque, NM, USA. These remote monitoring stations operated by ASO and SNL respectively, can retrieve data and images from the RMS computer at the DSFSF. The data and images are encrypted before transmission. The Remote Monitoring System field tests have been operational for six months with good test results. Sensors have performed well and the digital images have excellent resolution. The hardware and software have performed reliably without any major difficulties. This paper summarizes the highlights of the prototype system and the ongoing field tests

  17. Adaptation of high pressure water jets with abrasives for nuclear installations dismantling

    International Nuclear Information System (INIS)

    Rouviere, R.; Pinault, M.; Gasc, B.; Guiadeur, R.; Pilot, M.

    1989-01-01

    This report presents the work realized for adjust the cutting technology with high pressure water jet with abrasives for nuclear installation dismantling. It has necessited the conception and the adjustement of a remote tool and the realization of cutting tests with waste produce analysis. This technic can be ameliorated with better viewing systems and better fog suction systems

  18. Technical Characteristics of the Process Information System - Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Mandic, D.; Smolej, M.

    1998-01-01

    process Information System (PIS) of Nuclear Power Plant Krsko (NEK) is newly installed distributed and redundant process computer system which was built in NEK (Phase I: 1991-1995) to integrate the following main functions: - Signal Data Acquisition from the technological processes and environment - Implementation of the basic SCADA functions on the real time process signals data base - Execution of complex plant specific application programs - Advanced MMI (Man Machine Interface) features for users in MCR - Process data transfer to other than Main Control Room (MCR) locations - Process data archiving and capability to retrieve same data for future analysis PIS NEK architecture consists of three hierarchically interconnected hardware platforms: - PIS Level 1, DAS (Data Acquisition System) Level - PIS Level2, Level for MMI, application programs and process data archiving - PIS Level 3, Level for distribution of process data to remote users of PIS data. (author)

  19. Possibilities and prospects of investigation of irradiated structural and fuel materials using scanning electron microscope PHILLIPS XL 30 ESEM-TMP installed in the hot cell

    International Nuclear Information System (INIS)

    Golovanov, V. N.; Novoselov, A.E.; Kuzmin, S.V.; Yakovlev, V. V.

    2005-01-01

    Scanning electron microscope Philips XL 30 ESEM - TMP with X-ray microanalysis system INCA has been installed at SSC RF RIAR. The microscope is placed in the hot cell. Monitoring and control system is installed in the operator's room. Irradiated specimens are supplied to the hot cell through the transport terminal and installed into the microscope by manipulators. Direct contact of the personnel with radioactive materials is impossible. In addition it is developed the system of remote placement of the irradiated specimens into the specimen chamber of microscope. The system includes a stage with three seats, holders for different types of specimens and equipment for their remote loading in the holders. (Author)

  20. Remotely Accessed Vehicle Traffic Management System

    Science.gov (United States)

    Al-Alawi, Raida

    2010-06-01

    The ever increasing number of vehicles in most metropolitan cities around the world and the limitation in altering the transportation infrastructure, led to serious traffic congestion and an increase in the travelling time. In this work we exploit the emergence of novel technologies such as the internet, to design an intelligent Traffic Management System (TMS) that can remotely monitor and control a network of traffic light controllers located at different sites. The system is based on utilizing Embedded Web Servers (EWS) technology to design a web-based TMS. The EWS located at each intersection uses IP technology for communicating remotely with a Central Traffic Management Unit (CTMU) located at the traffic department authority. Friendly GUI software installed at the CTMU will be able to monitor the sequence of operation of the traffic lights and the presence of traffic at each intersection as well as remotely controlling the operation of the signals. The system has been validated by constructing a prototype that resembles the real application.

  1. JEarth | Analytical Remote Sensing Imagery Application for Researchers and Practitioners

    Science.gov (United States)

    Prashad, L.; Christensen, P. R.; Anwar, S.; Dickenshied, S.; Engle, E.; Noss, D.

    2009-12-01

    The ASU 100 Cities Project and the ASU Mars Space Flight Facility (MSFF) present JEarth, a set of analytical Geographic Information System (GIS) tools for viewing and processing Earth-based remote sensing imagery and vectors, including high-resolution and hyperspectral imagery such as TIMS and MASTER. JEarth is useful for a wide range of researchers and practitioners who need to access, view, and analyze remote sensing imagery. JEarth stems from existing MSFF applications: the Java application JMars (Java Mission-planning and Analysis for Remote Sensing) for viewing and analyzing remote sensing imagery and THMPROC, a web-based, interactive tool for processing imagery to create band combinations, stretches, and other imagery products. JEarth users can run the application on their desktops by installing Java-based open source software on Windows, Mac, or Linux operating systems.

  2. The JOYO remote monitoring system

    International Nuclear Information System (INIS)

    Damico, Joseph P.; Hashimoto, Yu

    2000-01-01

    The evolution of the personal computer, operating systems and applications software and the Internet has brought drastic change and many benefits worldwide. Remote monitoring systems benefit from computer network and other modern software technologies. The availability of fast, inexpensive and secure communications enables new solutions for monitoring system applications. The JOYO Remote Monitoring System (RMS) utilizes computer network communications and modular software design to provide a distributed integrated solution for monitoring multiple storage locations. This paper describes the remote monitoring system installed at the JOYO Fast Reactor. The system combines sensors, software, and computer network technologies to create a powerful data collection, storage and dissemination capability. The RMS provides a flexible, scalable solution for a variety of applications. The RMS integrates a variety of state of the art technologies from several sources and serves as a test bed for cutting edge technologies that can be shared with outside users. This paper describes the system components and their operation and discusses system benefits. Current activities and future plants for the JOYO RMS will be discussed. (author)

  3. Quantifying the Impact of Unavailability in Cyber-Physical Environments

    Energy Technology Data Exchange (ETDEWEB)

    Aissa, Anis Ben [Université de Tunis El Manar, Tunisia; Abercrombie, Robert K [ORNL; Sheldon, Federick T. [University of Memphis; Mili, Ali [New Jersey Insitute of Technology

    2014-01-01

    The Supervisory Control and Data Acquisition (SCADA) system discussed in this work manages a distributed control network for the Tunisian Electric & Gas Utility. The network is dispersed over a large geographic area that monitors and controls the flow of electricity/gas from both remote and centralized locations. The availability of the SCADA system in this context is critical to ensuring the uninterrupted delivery of energy, including safety, security, continuity of operations and revenue. Such SCADA systems are the backbone of national critical cyber-physical infrastructures. Herein, we propose adapting the Mean Failure Cost (MFC) metric for quantifying the cost of unavailability. This new metric combines the classic availability formulation with MFC. The resulting metric, so-called Econometric Availability (EA), offers a computational basis to evaluate a system in terms of the gain/loss ($/hour of operation) that affects each stakeholder due to unavailability.

  4. Tolerancing requirements for remote handling at the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Van Katwijk, C.; Keenan, R.M.; Bullis, R.E.

    1993-01-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed by Fluor Daniel, Inc. with Waste Chem Corporation as Fluor Daniel, Inc.'s major subcontractor specializing in vitrification and remote system technologies. United Engineers and Constructors (UE ampersand C)/Catalytic (UCAT) will construct the plant. Westinghouse Hanford Company is the Project Integration manager and Business manager, and as the plant operator it provides technical direction to the Architect/ Engineer team (A/E) and constructor on behalf of the US Department of Energy - Richland Field Office. The A/E has developed, in cooperation with UE ampersand C, Westinghouse Hanford Company, and the US Department of Energy, a new and innovative approach to installations of the many remote nozzles and electrical connectors that must be installed to demanding tolerances. This paper summarizes the key elements of the HWVP approach

  5. Remote replacement of materials open-test assembly specimens at the FFTF/IEM cell

    International Nuclear Information System (INIS)

    Gibbons, P.W.; Ramsey, E.B.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell is used for the remote disassembly of irradiated fuel and materials experiments. The materials open-test assembly (MOTA) is brought to the IEM cell for materials test specimen removal. The specimens are shipped to the materials laboratory for sorting and installation in new specimen holders and then returned within 10 days to the IEM cell where they are installed in a new MOTA vehicle for further irradiation. Reconstituting a MOTA is a challenging remote operation involving dozens of steps and two separate facilities. Handling and disassembling sodium-wetted components pose interesting handling, cleaning, and disposal challenges. The success of this system is evidenced by its timely completion in the critical path of FFTF outage schedules

  6. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  7. PENINGKATAN KEAMANAN SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA PADA SMART GRID SEBAGAI INFRASTRUKTUR KRITIS

    Directory of Open Access Journals (Sweden)

    Ahmad Budi Setiawan

    2016-10-01

    Full Text Available SCADA (Supervisory Control and Data Acquisition systems as the control unit of the smart grid has been used in almost various industries around the world in terms of automation systems. Smart grid technology combines the energy infrastructure and telecommunications and Internet networks. The system provides the operational ease and efficiency in the industry. However, the system has a lot of vulnerabilities in information security aspects that can have a major impact for the industry and even the economy. This study tried to design in building a smart grid cyber security, it includes the strategies that must be done and the information security system architecture to be built. The study was conducted qualitative in-depth interviews, focus group discussions and direct observation. Results of this research is the design strategy recommendations ddalam development of smart grid cyber security. Recommendation results of this study also intended as a suggestion-making framework for smart grid cyber security as a reference implementation of the smart grid in Indonesia.

  8. Macro and Micro Remote Viewing of Objects in Sealed Gloveboxes

    International Nuclear Information System (INIS)

    Heckendorn, F.M.

    2004-01-01

    The Savannah River Site uses sophisticated glovebox facilities to process and analyze material that is radiologically contaminated or that must be protected from contamination by atmospheric gases. The analysis can be visual, non destructive measurement, or destructive measurement, and allows for the gathering of information that would otherwise not be obtainable. Macro and Micro systems that cover a range of 2X to 400X magnifications with a robust system compatible with the harsh glovebox environment were installed. Remote video inspection systems were developed and deployed in Savannah River Site glovebox facilities that provide high quality or mega-pixel quality remote views, for remote inspections. The specialized video systems that are the subject of this report exhibited specialized field application of remote video/viewing techniques by expanding remote viewing to high and very high quality viewing in gloveboxes. This technological enhancement will allow the gathering of precision information that is otherwise not available

  9. Remote RemoteRemoteRemote sensing potential for sensing ...

    African Journals Online (AJOL)

    Remote RemoteRemoteRemote sensing potential for sensing potential for sensing potential for sensing potential for sensing potential for sensing potential for sensing potential for sensing potential for sensing potential for sensing potential for sensing p. A Ngie, F Ahmed, K Abutaleb ...

  10. A generic remote method invocation for intensive data processing

    International Nuclear Information System (INIS)

    Neto, A.; Alves, D.; Fernandes, H.; Ferreira, J.S.; Varandas, C.A.F.

    2006-01-01

    Based on the Extensible Markup Language (XML) and the Remote Method Invocation (RMI) standards, a client/server remote data analysis application has been developed for intensive data processing. This GRID oriented philosophy allows a powerful tool to maintain updated code and centralized computational resources. Another major feature is the ability to share proprietary algorithms in remote computers without the need of local code and libraries installation and maintenance. The 16 CPU Orionte cluster in operation at Centro de Fusao Nuclear (CFN) is currently used to provide remote data analysis. The codes running in languages such as Octave, C, Fortran or IDL are called through a script remote invocation and data is released to the client as soon as available. The remote calculations parameters are described in an XML file containing the configuration for the server runtime environment. Since the execution is made by calling a script any program can be launched to perform the analysis, the only requirement is the implementation of the protocol described in XML. Some plasma properties of the CFN tokamak (ISTTOK) that require heavy computational resources are already obtained using this approach, allowing ready inter-shot analysis and parameterization decisions

  11. A generic remote method invocation for intensive data processing

    Energy Technology Data Exchange (ETDEWEB)

    Neto, A. [Associacao Euratom/IST, Centro de Fusao Nuclear, Av. Rovisco Pais, P-1049-001 Lisbon (Portugal)]. E-mail: andre.neto@cfn.ist.utl.pt; Alves, D. [Associacao Euratom/IST, Centro de Fusao Nuclear, Av. Rovisco Pais, P-1049-001 Lisbon (Portugal); Fernandes, H. [Associacao Euratom/IST, Centro de Fusao Nuclear, Av. Rovisco Pais, P-1049-001 Lisbon (Portugal); Ferreira, J.S. [Associacao Euratom/IST, Centro de Fusao Nuclear, Av. Rovisco Pais, P-1049-001 Lisbon (Portugal); Varandas, C.A.F. [Associacao Euratom/IST, Centro de Fusao Nuclear, Av. Rovisco Pais, P-1049-001 Lisbon (Portugal)

    2006-07-15

    Based on the Extensible Markup Language (XML) and the Remote Method Invocation (RMI) standards, a client/server remote data analysis application has been developed for intensive data processing. This GRID oriented philosophy allows a powerful tool to maintain updated code and centralized computational resources. Another major feature is the ability to share proprietary algorithms in remote computers without the need of local code and libraries installation and maintenance. The 16 CPU Orionte cluster in operation at Centro de Fusao Nuclear (CFN) is currently used to provide remote data analysis. The codes running in languages such as Octave, C, Fortran or IDL are called through a script remote invocation and data is released to the client as soon as available. The remote calculations parameters are described in an XML file containing the configuration for the server runtime environment. Since the execution is made by calling a script any program can be launched to perform the analysis, the only requirement is the implementation of the protocol described in XML. Some plasma properties of the CFN tokamak (ISTTOK) that require heavy computational resources are already obtained using this approach, allowing ready inter-shot analysis and parameterization decisions.

  12. Water quality management in shrimp aquaculture ponds using remote water quality logging system

    Digital Repository Service at National Institute of Oceanography (India)

    Sreepada, R.A.; Kulkarni, S.; Suryavanshi, U.; Ingole, B.S.; Drensgstig, A.; Braaten, B.

    Currently an institutional co-operation project funded by NORAD is evaluating different environmental management strategies for sustainable aquaculture in India. A brief description of a remote water quality logging system installed in shrimp ponds...

  13. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-01-01

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors

  14. Completely contained and remotely operated digital density meter

    International Nuclear Information System (INIS)

    Goergen, C.R.

    1979-10-01

    A completely contained and remotely operated density determination system having unique features was designed, fabricated, and installed at the Savannah River Plant. The system, based on a Mettler calculating digital density meter, provides more precise and accurate results than the falling drop technique for measuring densities. The system is fast, simple, easy to operate, and has demonstrated both reliability and durability

  15. A Semi-Automatic, Remote-Controlled Video Observation System for Transient Luminous Events

    DEFF Research Database (Denmark)

    Allin, Thomas Højgaard; Neubert, Torsten; Laursen, Steen

    2003-01-01

    In support for global ELF/VLF observations, HF measurements in France, and conjugate photometry/VLF observations in South Africa, we developed and operated a semi-automatic, remotely controlled video system for the observation of middle-atmospheric transient luminous events (TLEs). Installed...

  16. VALIDACIÓN DEL PROCEDIMIENTO DE AJUSTE DE LA CARACTERÍSTICA ENERGÉTICA DE LOS BLOQUES

    Directory of Open Access Journals (Sweden)

    Juan Luis Rodríguez Olivera

    2011-02-01

    Full Text Available En el trabajo se valida el procedimiento vigente de actualización de la característica energética (curvasconsumo-entrega de los bloques, evidenciándose la no correspondencia de los modelos obtenidos con elcomportamiento real. Se proponen tres vías posibles de obtención de la información para un nuevométodo de actualización a partir de la instrumentación existente que incluye el empleo de la informaciónde los sistemas SCADA instalados.  This paper deals with the validation of the now in use, updating procedure of fuel rate curves (energycharacteristic of units, it shows no correspondence with the actual (situation behavior. Three possibleways to obtain the information to update models are proposed based on the monitoring installed equipmentdata which include the use of information of installed SCADA systems.

  17. Wired World-Wide Web Interactive Remote Event Display

    Energy Technology Data Exchange (ETDEWEB)

    De Groot, Nicolo

    2003-05-07

    WIRED (World-Wide Web Interactive Remote Event Display) is a framework, written in the Java{trademark} language, for building High Energy Physics event displays. An event display based on the WIRED framework enables users of a HEP collaboration to visualize and analyze events remotely using ordinary WWW browsers, on any type of machine. In addition, event displays using WIRED may provide the general public with access to the research of high energy physics. The recent introduction of the object-oriented Java{trademark} language enables the transfer of machine independent code across the Internet, to be safely executed by a Java enhanced WWW browser. We have employed this technology to create a remote event display in WWW. The combined Java-WWW technology hence assures a world wide availability of such an event display, an always up-to-date program and a platform independent implementation, which is easy to use and to install.

  18. Spatial Analysis of Political Capital Citation Using Remote Sensing ...

    African Journals Online (AJOL)

    Spatial Analysis of Political Capital Citation Using Remote Sensing and GIS; A Case Study of Lokoja. ... The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader). If you would like more information about how to print, save, ...

  19. Remote Agriculture Automation using Wireless Link and IoT Gateway Infrastructure

    DEFF Research Database (Denmark)

    Nakutis, Z.; Deksnys, V.; Jaurusevicius, I.

    2015-01-01

    processing and control algorithms that produce control stimulus are executed in the gateway. This approach features the advantage of convenient possibilities to change control rules from Cloud services (installing or configuring process controller) without updating firmware of remote sensors...... benefit from the proposed architecture are identified....

  20. Accurate Modeling of The Siemens S7 SCADA Protocol For Intrusion Detection And Digital Forensic

    Directory of Open Access Journals (Sweden)

    Amit Kleinmann

    2014-09-01

    Full Text Available The Siemens S7 protocol is commonly used in SCADA systems for communications between a Human Machine Interface (HMI and the Programmable Logic Controllers (PLCs. This paper presents a model-based Intrusion Detection Systems (IDS designed for S7 networks. The approach is based on the key observation that S7 traffic to and from a specific PLC is highly periodic; as a result, each HMI-PLC channel can be modeled using its own unique Deterministic Finite Automaton (DFA. The resulting DFA-based IDS is very sensitive and is able to flag anomalies such as a message appearing out of its position in the normal sequence or a message referring to a single unexpected bit. The intrusion detection approach was evaluated on traffic from two production systems. Despite its high sensitivity, the system had a very low false positive rate - over 99.82% of the traffic was identified as normal.

  1. Development of a Remote Monitoring System Using Meteor Burst Technology

    International Nuclear Information System (INIS)

    Ewanic, M.A.; Dunstan, M.T.; Reichhardt, D.K.

    2006-01-01

    Monitoring the cleanup and closure of contaminated sites requires extensive data acquisition, processing, and storage. At remote sites, the task of monitoring often becomes problematical due to the lack of site infrastructure (i.e., electrical power lines, telephone lines, etc.). MSE Technology Applications, Inc. (MSE) has designed an economical and efficient remote monitoring system that will handle large amounts of data; process the data, if necessary; and transmit this data over long distances. Design criteria MSE considered during the development of the remote monitoring system included: the ability to handle multiple, remote sampling points with independent sampling frequencies; robust (i.e., less susceptible to moisture, heat, and cold extremes); independent of infrastructure; user friendly; economical; and easy to expand system capabilities. MSE installed and tested a prototype system at the Mike Mansfield Advanced Technology Center (MMATC), Butte, Montana, in June 2005. The system MSE designed and installed consisted of a 'master' control station and two remote 'slave' stations. Data acquired at the two slave stations were transmitted to the master control station, which then transmits a complete data package to a ground station using meteor burst technology. The meteor burst technology has no need for hardwired land-lines or man-made satellites. Instead, it uses ionized particles in the Earth's atmosphere to propagate a radio signal. One major advantage of the system is that it can be configured to accept data from virtually any type of device, so long as the signal from the device can be read and recorded by a standard data-logger. In fact, MSE has designed and built an electrical resistivity monitoring system that will be powered and controlled by the meteor burst system components. As sites move through the process of remediation and eventual closure, monitoring provides data vital to the successful long term management of the site. The remote

  2. Development of Web-Based Remote Desktop to Provide Adaptive User Interfaces in Cloud Platform

    OpenAIRE

    Shuen-Tai Wang; Hsi-Ya Chang

    2014-01-01

    Cloud virtualization technologies are becoming more and more prevalent, cloud users usually encounter the problem of how to access to the virtualized remote desktops easily over the web without requiring the installation of special clients. To resolve this issue, we took advantage of the HTML5 technology and developed web-based remote desktop. It permits users to access the terminal which running in our cloud platform from anywhere. We implemented a sketch of web interfac...

  3. Controlling the Filling and Capping Operation of a Bottling Plant using PLC and SCADA

    Directory of Open Access Journals (Sweden)

    Kunal Chakraborty

    2015-03-01

    Full Text Available This paper presents basic stages of operation of a bottling plant, i.e. the filling and capping process. The main aim of our paper is to control the filling and capping section of a bottling plant simultaneously. At first a set of empty bottle is run by using a conveyer towards filling section, after the operation, the filled bottles are sent towards the capping section. After successful capping operation, the sealed bottles terminate towards exit and a new set of empty bottle arrive, in this way the process continues. This paper includes the method using which, a bunch of bottles can be filled and capped at one instant of time. This method has made the operation more flexible and time saving. The filling and capping operations are controlled using Programmable Logic Controllers (PLC, as the PLC’s are very much user-efficient, cost-effective and easy to control. By using PLC automation the whole process is kept under control. SCADA (Supervisory Control and Data Acquisition is used to monitor the process by means of a display system.

  4. Wind turbine wake measurement in complex terrain

    DEFF Research Database (Denmark)

    Hansen, Kurt Schaldemose; Larsen, Gunner Chr.; Menke, Robert

    2016-01-01

    SCADA data from a wind farm and high frequency time series measurements obtained with remote scanning systems have been analysed with focus on identification of wind turbine wake properties in complex terrain. The analysis indicates that within the flow regime characterized by medium to large dow...

  5. Installation technology of reactor internals on shroud replacement work

    International Nuclear Information System (INIS)

    Miyano, Hiroshi

    1999-01-01

    Since the replacement of large welded reactor internals much as a core shroud did not have a precedent in the world, quite a few technologies had to be developed. Especially for the installation of new core shroud, jet pumps, core plate and top guide, the accurate weld and fit-up techniques for large structures was required to secure their integrity. The vessel shielding system was utilized to reduce general area dose rate such that all replacement work. For jet pump installation, automatic remote welding machines were used for high radiation area. As for the core shroud, shroud support weld prep machining tool with high accuracy, jacking system to support fit-up, new weld machine for small work space and low heat input weld joint were developed. Shroud replacement work in Fukushima Dai-ichi NPS Unit 3 (1F-3) with application of these development techniques, was successfully accomplished. The technology is applied for 1F-2 replacement work also. (author)

  6. Remote handling concept for the neutral beam system

    International Nuclear Information System (INIS)

    Choi, Chang-Hwan; Palmer, Jim; Conesa, Carles; Friconneau, Jean-Pierre; Martins, Jean-Pierre; Subramanian, Rajendran; Jeannoutot, Thomas; Graceffa, Joseph; Schunke, Beatrix; Uffelen, MarcoVan; Damiani, Carlo; Tesini, Alessandro

    2011-01-01

    The NB ITER Remote Maintenance System (NB IRMS) provides the means for the remote maintenance within the NB Cell by removal and replacement of the plant equipment. The NB IRMS will be installed and removed with the assistance of human workers during the preparation, and post-operation phase. During the maintenance operation after opening the Passive Magnetic Shield (PMS) and vessels, the maintenance activity and recovery from failure should be conducted remotely. This paper describes the concept design of the NB IRMS operating inside the NB cell for maintenance of the plant equipment such as NB components, and Upper Port Plugs (UPP). The main tasks of the IRMS, the description of the sub-systems and their specification, and deployment/operation principles are presented. The transportation concept of the NB IRMS to the hot cell facility for storage and maintenance is presented, which is to avoid unnecessary exposure on the equipment inside the NB cell during the machine operation.

  7. Proactive monitoring of a wind turbine array with lidar measurements, SCADA data and a data-driven RANS solver

    Science.gov (United States)

    Iungo, G.; Said, E. A.; Santhanagopalan, V.; Zhan, L.

    2016-12-01

    Power production of a wind farm and durability of wind turbines are strongly dependent on non-linear wake interactions occurring within a turbine array. Wake dynamics are highly affected by the specific site conditions, such as topography and local atmospheric conditions. Furthermore, contingencies through the life of a wind farm, such as turbine ageing and off-design operations, make prediction of wake interactions and power performance a great challenge in wind energy. In this work, operations of an onshore wind turbine array were monitored through lidar measurements, SCADA and met-tower data. The atmospheric wind field investing the wind farm was estimated by using synergistically the available data through five different methods, which are characterized by different confidence levels. By combining SCADA data and the lidar measurements, it was possible to estimate power losses connected with wake interactions. For this specific array, power losses were estimated to be 4% and 2% of the total power production for stable and convective atmospheric regimes, respectively. The entire dataset was then leveraged for the calibration of a data-driven RANS (DDRANS) solver for prediction of wind turbine wakes and power production. The DDRANS is based on a parabolic formulation of the Navier-Stokes equations with axisymmetry and boundary layer approximations, which allow achieving very low computational costs. Accuracy in prediction of wind turbine wakes and power production is achieved through an optimal tuning of the turbulence closure model. The latter is based on a mixing length model, which was developed based on previous wind turbine wake studies carried out through large eddy simulations and wind tunnel experiments. Several operative conditions of the wind farm under examination were reproduced through DDRANS for different stability regimes, wind directions and wind velocity. The results show that DDRANS is capable of achieving a good level of accuracy in prediction

  8. U.S. SUPPORT PROGRAM CONTRIBUTIONS TO REMOTE MONITORING

    International Nuclear Information System (INIS)

    PEPPER, S.E.

    2000-01-01

    Since 1993, the IAEA has made great progress in the implementation of remote monitoring. Equipment has been developed and tested, and installed systems are being used for safeguards purposes. The cost of equipment, the complexity of communication technology, and maintenance of the equipment are challenges that still face the IAEA. Resolution of these challenges will require significant effort. The USSP is committed to assisting the IAEA to overcome these challenges

  9. Experience with Remote Job Execution

    International Nuclear Information System (INIS)

    Lynch, Vickie E.; Cobb, John W; Green, Mark L.; Kohl, James Arthur; Miller, Stephen D.; Ren, Shelly; Smith, Bradford C.; Vazhkudai, Sudharshan S.

    2008-01-01

    The Neutron Science Portal at Oak Ridge National Laboratory submits jobs to the TeraGrid for remote job execution. The TeraGrid is a network of high performance computers supported by the US National Science Foundation. There are eleven partner facilities with over a petaflop of peak computing performance and sixty petabytes of long-term storage. Globus is installed on a local machine and used for job submission. The graphical user interface is produced by java coding that reads an XML file. After submission, the status of the job is displayed in a Job Information Service window which queries globus for the status. The output folder produced in the scratch directory of the TeraGrid machine is returned to the portal with globus-url-copy command that uses the gridftp servers on the TeraGrid machines. This folder is copied from the stage-in directory of the community account to the user's results directory where the output can be plotted using the portal's visualization services. The primary problem with remote job execution is diagnosing execution problems. We have daily tests of submitting multiple remote jobs from the portal. When these jobs fail on a computer, it is difficult to diagnose the problem from the globus output. Successes and problems will be presented

  10. Remote diagnosis as used for mechanized parking systems

    Science.gov (United States)

    Humberg, Heinz; Maeder, Hans Friedrich; Will, Frank

    1992-10-01

    The new possibilities offered by worldwide data transmission networks, which are being used for the remote diagnosis of mechanized parking systems are discussed. This has led to a reduction in service costs for systems installed in Asia and elsewhere. The principles of the mechanized multistorey car park and their control concept are described. The parking facilities are fully geared up for remote diagnosis, the key functions of which are: data collection, data storage, data transmission, and data evaluation. The reports transmitted from the parking facility are analyzed using an evaluation system. The objectives are to detect impending component failures and to quickly identify the causes of irregularities which have occurred. The evaluation system can be easily adapted for other applications.

  11. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Science.gov (United States)

    2010-10-01

    ... (SCADA) system, other leak detection system, or an alternative method of control. (iii) Remote valve... outs, leakage, or other activities or conditions affecting the safety operation of the pipeline. (ii... requirements of § 192.707(d) except in agricultural areas, large water crossings or swamp, steep terrain, or...

  12. IEC 61850 based refurbishment strategies for protection and automation systems

    Energy Technology Data Exchange (ETDEWEB)

    Tholomier, D. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada); Hossenlopp, L. [Areva T and D Automation Inc., Paris (France); Apostolov, A. [Omicron Electronics, Houston, TX (United States)

    2008-07-01

    Electric utilities are currently facing the challenge of refurbishing aging transmission networks and power system infrastructure at a time of severe economic, environmental and competitive constraints. This paper addressed the issue of an appropriate approach to retrofit the hardware and software of substation secondary systems, and how IEC standards could be used to set up a long term strategy. The first part of the paper considered an asset management strategy for refurbishing substation secondary systems, while the second part of the paper addressed the strategies for refurbishing existing power plants. The final section of the paper analyzed refurbishment strategies designed to protect power distribution systems. The impact of IEC 61850 and how legacy devices can be integrated in substation automation systems were discussed. It was concluded that new SCADA systems are needed to handle new technology. Additional features like remote control, remote settings, remote disturbance records analysis and remote maintenance are also needed to properly operate the power system. The value of preventive maintenance using remote monitoring systems to determine the status of all the digital electronic devices installed in substation was also discussed. IEC 61850 offers several opportunities to improve grid operation and control. It supports interoperability between protective relays and control devices from different manufacturers in the substation, which is required in order to achieve substation level interlocking, protection and control functions and improve the efficiency of microprocessor based relays applications. This technology has now passed the initial stage of implementation and several projects are underway worldwide. 13 figs.

  13. PV systems for remote villages: Service-learning and communal sharing

    Energy Technology Data Exchange (ETDEWEB)

    Duffy, J.; Soper, P.; Prasitpianchai, S.; Villanueva, D.; Alegria, L.; Rux, A.

    1999-07-01

    The remote village of Malvas in the Andes seems typical of many in Peru. The 500 descendants of the Quechua once ruled by the Inca have no electricity, no running water, one telephone, and mud adobe houses. At a 10,000-foot altitude, residents survive with subsistence farming. A group designed and installed a photovoltaic system to provide a vaccine refrigerator, lights, and a transceiver radio system in the town medical clinic last August. They installed light systems in four other town medical clinics in January. This project involves service-learning: combining service with academic subject matter, in this case solar engineering. Key elements of the project also include: letting people define their needs, sustainable infrastructure development, community sharing of installation and virtual ownership (to go along with almost everything else that is shared in common).

  14. How wireless remote technology reduces cost, boosts productivity and improves safety in upstream oil and gas operations

    Energy Technology Data Exchange (ETDEWEB)

    Wommack, K. [Viatran, Edmonton, AB (Canada)

    2009-09-15

    This article demonstrated how wireless communications can help oil and gas producers obtain the most current information on the status of their operations to help optimize operations and protect workers and equipment. Wireless communication can provide benefits at nearly every phase of upstream production. When combined with pressure, temperature, flow, level and other sensing devices, wireless communications provide an effective and economical way to deliver data on well or pipeline operations to site managers; optimize well-production, minimize workovers and prevent blowdowns at the wellhead; track oil and water production; measure differential pressure, line pressure and line temperature; and monitor the motorized choke and control valve position. Wireless technology offers significant savings through improved maintenance efficiency. With wireless systems in remote locations, there are seldom problems in the transmission path. Wireless technology makes it much easier and affordable to manage well operations from a safe distance. By eliminating the need for wires in a fracing operation, wireless can help fracing companies maintain a safe operating distance from their target wells, and move operations from well to well with ease. A wireless communication system for transmitting process data from field sensors to a field processing device consists of radio transmitters, a communications gateway and a user interface. The communications hub receives encrypted messages from the remote devices and transmits them to a flow computer, SCADA system, or Distributed Control System. Data is then transmitted to a central office. 1 fig.

  15. The effect of stability on the coastal gradients at the Anholt wind farm

    DEFF Research Database (Denmark)

    Volker, Patrick; Hasager, Charlotte Bay; Badger, Merete

    We use Synthetic Aperture Radar (SAR) and SCADA measurements and mesoscale model simulations from the Weather Research and Forecast (WRF) model[3] to analyse the flow conditions at the Danish offshore wind farm at Anholt. The first Danish oshore wind farms have been installed in the North Sea of ...

  16. SP-100 reactor disassembly remote handling test program

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Maiden, G.E.; Vader, D.P.

    1991-01-01

    This paper is presented as an overview of the remote handling equipment validation testing, which will be conducted before installation and use in the ground engineering test facility. This equipment will be used to defuel the SP-100 reactor core after removing it from the Test Assembly following nuclear testing. A series of full scale mock-up operational tests will be conducted at a Hanford Site facility to verify equipment design, operation, and capabilities

  17. Remote community electrification program - small wind integration in BC's offgrid communities

    Energy Technology Data Exchange (ETDEWEB)

    Lafaille, Julien [BC Hydro (Canada)

    2011-07-01

    The paper presents the Remote Community Electrification (RCE) program and wind integration in BC's off grid communities. The program offers electric utility service to eligible remote communities in BC. Most of them are offered off-grid services although it is cheaper to connect a community to a grid. BC hydro serves some communities that are not connected to the main grid. Local diesel or small hydro-generating stations are used to serve remote communities. The renewable energy program target is to reach 50% of remote communities. The reason that wind is a small part of the renewables is that hydro and biomass are abundant in BC. Some other barriers include high installation costs, durability concerns, and lack of in-house technical expertise. Some small Wind initiatives that have been taken were relatively few and fairly small. It can be concluded that due to a poor wind resource and the relatively low cost of diesel, there is limited potential for wind in BC remote communities.

  18. 49 CFR 192.3 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... with the responsibility for remotely monitoring and controlling a pipeline facility. Controller means a... via a SCADA system from a control room, and who has operational authority and accountability for the... to navigation means, for the purposes of this part, a pipeline where the top of the pipe is less than...

  19. Development of spent fuel remote handling technology

    Energy Technology Data Exchange (ETDEWEB)

    Park, B. S.; Yoon, J. S.; Hong, H. D. (and others)

    2007-02-15

    In this research, the remote handling technology was developed for the ACP application. The ACP gives a possible solution to reduce the rapidly cumulative amount of spent fuels generated from the nuclear power plants in Korea. The remote technologies developed in this work are a slitting device, a voloxidizer, a modified telescopic servo manipulator and a digital mock-up. A slitting device was developed to declad the spent fuel rod-cuts and collect the spent fuel UO{sub 2} pellets. A voloxidizer was developed to convert the spent fuel UO{sub 2} pellets obtained from the slitting process in to U{sub 3}O{sub 8} powder. Experiments were performed to test the capabilities and remote operation of the developed slitting device and voloxidizer by using simulated rod-cuts and fuel in the ACP hot cell. A telescopic servo manipulator was redesigned and manufactured improving the structure of the prototype. This servo manipulator was installed in the ACP hot cell, and the target module for maintenance of the process equipment was selected. The optimal procedures for remote operation were made through the maintenance tests by using the servo manipulator. The ACP digital mockup in a virtual environment was established to secure a reliability and safety of remote operation and maintenance. The simulation for the remote operation and maintenance was implemented and the operability was analyzed. A digital mockup about the preliminary conceptual design of an enginnering-scale ACP was established, and an analysis about a scale of facility and remote handling was accomplished. The real-time diagnostic technique was developed to detect the possible fault accidents of the slitting device. An assessment of radiation effect for various sensors was also conducted in the radiation environment.

  20. Comparison of Remote Labs in Different Technologies

    Directory of Open Access Journals (Sweden)

    Christian Mergl

    2006-11-01

    Full Text Available Recently several possibilities arose to conduct electronic measurement experiments via remote control. Now a comparison of the latest different technologies should bring some answers to interested people, so that they can choose the best technology for them under their criteria. Criteria in this case are, the up-to-dateness of the technology, the development-time, the system-independency of the client in terms of the operating system and internet browser as well as other necessary installations on the client.

  1. Development of remote electrochemical decontamination for hot cell applications

    International Nuclear Information System (INIS)

    Turner, A.D.; Pottinger, J.S.; Lain, M.J.; Dawson, R.K.; Neville, M.D.; Junkison, A.R.

    1988-01-01

    The paper concerns the development and evaluation of remote electrochemical decontamination systems for metal surfaces, in connection with the decommissioning of nuclear installations. Two types of technique based on the electrochemical dissolution of thin surface layers of the substrate were investigated: immersion of small items in tanks for electroetching and in situ electropolishing. A description is given of the work programme, the progress of work and the results obtained. (U.K.)

  2. Design and installation of a laboratory-scale system for radioactive waste treatment

    International Nuclear Information System (INIS)

    Berger, D.N.; Knox, C.A.; Siemens, D.H.

    1980-05-01

    Described are the mechanical design features and remote installation of a laboratory-scale radiochemical immobilization system which is to provide a means at Pacific Northwest Laboratory of studying effluents generated during solidification of high-level liquid radioactive waste. Detailed are the hot cell, instrumentation, two 4-in. and 12-in. service racks, the immobilization system modules - waste feed, spray calciner unit, and effluent - and a gamma emission monitor system for viewing calcine powder buildup in the spray calciner/in-can melter

  3. Development of new process network for gas chromatograph and analyzers connected with SCADA system and Digital Control Computers at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Deneanu, Cornel; Popa Nemoiu, Dragos; Nica, Dana; Bucur, Cosmin

    2007-01-01

    The continuous monitoring of gas mixture concentrations (deuterium/ hydrogen/oxygen/nitrogen) accumulated in 'Moderator Cover Gas', 'Liquid Control Zone' and 'Heat Transport D 2 O Storage Tank Cover Gas', as well as the continuous monitoring of Heavy Water into Light Water concentration in 'Boilers Steam', 'Boilers Blown Down', 'Moderator heat exchangers', and 'Recirculated Water System', sensing any leaks of Cernavoda NPP U1 led to requirement of developing a new process network for gas chromatograph and analyzers connected to the SCADA system and Digital Control Computers of Cernavoda NPP Unit 1. In 2005 it was designed and implemented the process network for gas chromatograph which connected the gas chromatograph equipment to the SCADA system and Digital Control Computers of the Cernavoda NPP Unit 1. Later this process network for gas chromatograph has been extended to connect the AE13 and AE14 Fourier Transform Infrared (FTIR) analyzers with either. The Gas Chromatograph equipment measures with best accuracy the mixture gases (deuterium/ hydrogen/oxygen/nitrogen) concentration. The Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers measure the Heavy Water into Light Water concentration in Boilers Steam, Boilers BlownDown, Moderator heat exchangers, and Recirculated Water System, monitoring and signaling any leaks. The Gas Chromatograph equipment and Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers use the new OPC (Object Link Embedded for Process Control) technologies available in ABB's VistaNet network for interoperability with automation equipment. This new process network has interconnected the ABB chromatograph and Fourier Transform Infrared analyzers with plant Digital Control Computers using new technology. The result was an increased reliability and capability for inspection and improved system safety

  4. Evaluation of the revised electrolytic reduction reactor from a remote operability aspect

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyo Jik; Yoon, K. H.; Kim, K. H. (and others)

    2008-01-15

    This report presents an evaluation of the remote operability of the revised electrolytic reduction (ER) reactor installed in the ACP at KAERI. All operations have to be implemented in a fully remote manner since the ACPF is a hotcell for handling highly radioactive materials such as spent nuclear fuels. In particular, the ER process is a key process of the Advanced spent fuel Conditioning Process (ACP) and it needs a lot of other auxiliary equipment to perform it. Also, since the ER equipment is too big and complicated, and contrarily the ACPF is not big enough, and one common rail is allotted for a bridge transported servo manipulator, an in-cell crane and a gate crane, a remote handling of the ER reactor is accompanied by a difficulty for a remote operation. For an easy understanding, short overview of the ER process, the remote handling equipment, the structural configuration of the ACPF and the detail drawings of the ER equipment are presented. Through 4 month-remote operational tests, detailed operational procedures are presented along with pictures. The remote handling equipment and tools required in each operation are addressed in detail. Also, the procedure to implement each remote operation, and a task difficulty are evaluated from a remote operability aspect. All the remote tasks are distinguished according to whether a remote operation can be performed or not. Finally, partial improvement or an idea to solve the suggested problems is presented. This report will assist in modifying or scaling up the ER reactor.

  5. A Mixed WLS Power System State Estimation Method Integrating a Wide-Area Measurement System and SCADA Technology

    Directory of Open Access Journals (Sweden)

    Tao Jin

    2018-02-01

    Full Text Available To address the issue that the phasor measurement units (PMUs of wide area measurement system (WAMS are not sufficient for static state estimation in most existing power systems, this paper proposes a mixed power system weighted least squares (WLS state estimation method integrating a wide-area measurement system and supervisory control and data acquisition (SCADA technology. The hybrid calculation model is established by incorporating phasor measurements (including the node voltage phasors and branch current phasors and the results of the traditional state estimator in a post-processing estimator. The performance assessment is discussed through setting up mathematical models of the distribution network. Based on PMU placement optimization and bias analysis, the effectiveness of the proposed method was proved to be accurate and reliable by simulations of different cases. Furthermore, emulating calculation shows this method greatly improves the accuracy and stability of the state estimation solution, compared with the traditional WLS state estimation.

  6. Power-over-ethernet for remote measurement and control

    International Nuclear Information System (INIS)

    Behera, Rajendra Prasad; Murali, N.

    2011-01-01

    Power-Over-Ethernet (PoE) technology (IEEE standard 802.3af) allows Remote Measurement and Control in harsh environment where human access is difficult in various nuclear research fields. The terminal measurement and control unit receives power for its operation and communicates data over the same LAN cable, without needing to provide power supplies from different source. Almost all data acquisition systems require both data connectivity and a power supply. In a familiar example, telephones are powered from the telephone exchange through the same twisted pair that carries the voice. Now we can do the same thing with Ethernet devices by combining power and data. Only one set of wires is required to bring to the end measurement and control unit which will simplify installation and save space. Remote unit can be easily moved, to wherever a LAN cable can be laid with minimal disruption to the workplace. It is safer as no mains supply is required. Uninterrupted power supply can be guaranteed to the terminal unit during mains power failure. The terminal unit can be shut down and reset remotely without needing for a reset button and power switch. Simple Network Management Protocol (SNMP) can be used to monitor and control the remote unit. PoE will enable to deploy many more embedded systems in nuclear and other industry like Voice over Internet Protocol (VoIP), Security Camera, Tele-information System, Remote Access Control System, Intruder Detection System, and Tele-Medicine System, etc. (author)

  7. Remotely controlled reagent feed system for mixed waste treatment Tank Farm

    International Nuclear Information System (INIS)

    Dennison, D.K.; Bowers, J.S.; Reed, R.K.

    1995-02-01

    LLNL has developed and installed a large-scale. remotely controlled, reagent feed system for use at its existing aqueous low-level radioactive and mixed waste treatment facility (Tank Farm). LLNL's Tank Farm is used to treat aqueous low-level and mixed wastes prior to vacuum filtration and to remove the hazardous and radioactive components before it is discharged to the City of Livermore Water Reclamation Plant (LWRP) via the sanitary sewer in accordance with established limits. This reagent feed system was installed to improve operational safety and process efficiency by eliminating the need for manual handling of various reagents used in the aqueous waste treatment processes. This was done by installing a delivery system that is controlled either remotely or locally via a programmable logic controller (PLC). The system consists of a pumping station, four sets of piping to each of six 6,800-L (1,800-gal) treatment tanks, air-actuated discharge valves at each tank, a pH/temperature probe at each tank, and the PLC-based control and monitoring system. During operation, the reagents are slowly added to the tanks in a preprogrammed and controlled manner while the pH, temperature, and liquid level are continuously monitored by the PLC. This paper presents the purpose of this reagent feed system, provides background related to LLNL's low-level/mixed waste treatment processes, describes the major system components, outlines system operation, and discusses current status and plans

  8. Monitoring Nuclear Facilities Using Satellite Imagery and Associated Remote Sensing Techniques

    International Nuclear Information System (INIS)

    Lafitte, Marc; Robin, Jean‑Philippe

    2015-01-01

    The mission of the European Union Satellite Centre (SatCen) is “to support the decision making and actions of the European Union in the field of the CFSP and in particular the CSDP, including European Union crisis management missions and operations, by providing, at the request of the Council or the European Union High Representative, products and services resulting from the exploitation of relevant space assets and collateral data, including satellite and aerial imagery, and related services”. The SatCen Non‑Proliferation Team, part of the SatCen Operations Division, is responsible for the analysis of installations that are involved, or could be involved, in the preparation or acquisition of capabilities intended to divert the production of nuclear material for military purposes and, in particular, regarding the spread of Weapons of Mass destruction and their means of delivery. For the last four decades, satellite imagery and associated remote sensing and geospatial techniques have increasingly expanded their capabilities. The unprecedented Very High Resolution (VHR) data currently available, the improved spectral capabilities, the increasing number of sensors and ever increasing computing capacity, has opened up a wide range of new perspectives for remote sensing applications. Concurrently, the availability of open source information (OSINF), has increased exponentially through the medium of the internet. This range of new capabilities for sensors and associated remote sensing techniques have strengthened the SatCen analysis capabilities for the monitoring of suspected proliferation installations for the detection of undeclared nuclear facilities, processes and activities. The combination of these remote sensing techniques, imagery analysis, open source investigation and their integration into Geographic Information Systems (GIS), undoubtedly improve the efficiency and comprehensive analysis capability provided by the SatCen to the EU stake‑holders. The

  9. Remote experiment participation on Tore-Supra

    International Nuclear Information System (INIS)

    Theis, J.-M.; Larsen, J.-M.

    2004-01-01

    The DRFC has traditionally had a very large external collaboration involvement. In particular, 15% of the DRFC work is directed towards the JET programme. As a consequence substantial telecommunications facilities have been installed [F.E.D. 60/3 (2002) 449; F.E.D. 60/3 (2002) 459]. A specific station for remote communication has been set up in the Tore-Supra control room, closely coupled to a collaborating team at INRS Que., Canada. This paper describes our pilot experience with the Canadian participation, which gives details of the communication and data sharing tools used to fully work on Tore-Supra

  10. Development of remote equipment for a DUPIC fuel fabrication at KAERI

    International Nuclear Information System (INIS)

    Lee, Jungwon; Kim, Kiho; Park, Geunil; Yang, Myungseung; Song, Keechan

    2007-01-01

    The DUPIC (Direct Use of spent PWR fuel In CANDU reactors) technology is to directly refabricate CANDU fuel from spent PWR fuel without any separation of the fissile materials and fission products. Thus, the DUPIC fuel material always remains in a highly radioactive state, which requires a remote fuel fabrication in a hot-cell. About 25 pieces of remote equipment including auxiliary systems such as a hot-cell shield plug were developed and installed in a hot cell. In order to supply a high electric current to a sintering furnace in-cell from an outside cell, a shield plug was developed. It consists of three components - a steel shield plug with an embedded spiral cooling line, stepped copper bus bars, and a shielding lead block. Experiments to evaluate the performance of the sintering furnace with the developed shield plug were carried out. It was concluded that, from the experimental results, the newly developed hot-cell shield plug satisfied all the requirements for a remote operation on a sintering furnace. DUPIC fuel pellets and elements were successfully fabricated with the developed remote equipment. (authors)

  11. Construction of a smart medication dispenser with high degree of scalability and remote manageability.

    Science.gov (United States)

    Pak, JuGeon; Park, KeeHyun

    2012-01-01

    We propose a smart medication dispenser having a high degree of scalability and remote manageability. We construct the dispenser to have extensible hardware architecture for achieving scalability, and we install an agent program in it for achieving remote manageability. The dispenser operates as follows: when the real-time clock reaches the predetermined medication time and the user presses the dispense button at that time, the predetermined medication is dispensed from the medication dispensing tray (MDT). In the proposed dispenser, the medication for each patient is stored in an MDT. One smart medication dispenser contains mainly one MDT; however, the dispenser can be extended to include more MDTs in order to support multiple users using one dispenser. For remote management, the proposed dispenser transmits the medication status and the system configurations to the monitoring server. In the case of a specific event such as a shortage of medication, memory overload, software error, or non-adherence, the event is transmitted immediately. All these operations are performed automatically without the intervention of patients, through the agent program installed in the dispenser. Results of implementation and verification show that the proposed dispenser operates normally and performs the management operations from the medication monitoring server suitably.

  12. Construction of a Smart Medication Dispenser with High Degree of Scalability and Remote Manageability

    Directory of Open Access Journals (Sweden)

    JuGeon Pak

    2012-01-01

    Full Text Available We propose a smart medication dispenser having a high degree of scalability and remote manageability. We construct the dispenser to have extensible hardware architecture for achieving scalability, and we install an agent program in it for achieving remote manageability. The dispenser operates as follows: when the real-time clock reaches the predetermined medication time and the user presses the dispense button at that time, the predetermined medication is dispensed from the medication dispensing tray (MDT. In the proposed dispenser, the medication for each patient is stored in an MDT. One smart medication dispenser contains mainly one MDT; however, the dispenser can be extended to include more MDTs in order to support multiple users using one dispenser. For remote management, the proposed dispenser transmits the medication status and the system configurations to the monitoring server. In the case of a specific event such as a shortage of medication, memory overload, software error, or non-adherence, the event is transmitted immediately. All these operations are performed automatically without the intervention of patients, through the agent program installed in the dispenser. Results of implementation and verification show that the proposed dispenser operates normally and performs the management operations from the medication monitoring server suitably.

  13. Supervision system for safety valves and operative metering station of the Yacuiba-Rio Grande Gas Pipeline; Sistema de supervisao para valvulas de seguranca e estacoes de medicao operativas do gasoducto Yacuiba-Rio Grande

    Energy Technology Data Exchange (ETDEWEB)

    Cabrera, Fernando; Marques, Ailton [Transierra S.A., La Paz (Bolivia)

    2005-07-01

    One of the most critical points for the opportune intervention that compromises the operations of TRANSIERRA S.A., is the integrity of the facilities, the adjacent communities and the environment are the Shut Down Valves (SDV) of the GASYRG Gas pipeline. The GASYRG (Yacuiba Rio Grande Gas pipeline) with an extension of 432 Km and a Pipeline diameter of 32 inches presents 2 Receipt Stations, 1 Delivery Point and 11 Line Valves. The pipeline operation is made by satellite and SCADA applications; it is supervised and controlled on-line at the points of delivery and receipt; monitoring of the SDV's was left aside; because of this it was necessary to develop a Remote Supervision System. This system combines remote devices with the Control Philosophy of Report By-Exception, Low Orbit Satellite System, Internet application and Intranet. The mentioned information is sent in e-mail format to a Satellite Teleport located in London, England. The process information is sent via Internet to TRANSIERRA's SCADA Servers for its interpretation and display in the HMI of the GASYRG supervisory system. (author)

  14. Installation and routing of critical embedments at the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Van Katwijk, C.; Keenan, R.M.; Watts, C.

    1993-01-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed by Fluor Daniel. Waste Chem Corporation is providing specialized expertise as Fluor Daniel's major subcontractor for vitrification and remote systems technologies. Westinghouse Hanford Company (Westinghouse Hanford) is the Project Integration manager and Business manager, and as the plant operator it provides technical direction to the Architect/Engineer team and constructor on behalf of the US Department of Energy, Richland Field Office. The Hot Cell portion of HWVP Vitrification Building contains very congested piping systems in the walls that penetrate in to the cells to nozzles for remote piping jumper assemblies. These nozzles require very tight tolerances to ensure a leak-tight fit to the jumpers. An approach has been developed that minimizes the time and expense of installing these nozzles in the wall to tight construction tolerances. This approach is called the Ganged Embed Plate (GEP) design

  15. Secure Data Transfer Guidance for Industrial Control and SCADA Systems

    Energy Technology Data Exchange (ETDEWEB)

    Mahan, Robert E.; Fluckiger, Jerry D.; Clements, Samuel L.; Tews, Cody W.; Burnette, John R.; Goranson, Craig A.; Kirkham, Harold

    2011-09-01

    This document was developed to provide guidance for the implementation of secure data transfer in a complex computational infrastructure representative of the electric power and oil and natural gas enterprises and the control systems they implement. For the past 20 years the cyber security community has focused on preventative measures intended to keep systems secure by providing a hard outer shell that is difficult to penetrate. Over time, the hard exterior, soft interior focus changed to focus on defense-in-depth adding multiple layers of protection, introducing intrusion detection systems, more effective incident response and cleanup, and many other security measures. Despite much larger expenditures and more layers of defense, successful attacks have only increased in number and severity. Consequently, it is time to re-focus the conventional approach to cyber security. While it is still important to implement measures to keep intruders out, a new protection paradigm is warranted that is aimed at discovering attempted or real compromises as early as possible. Put simply, organizations should take as fact that they have been, are now, or will be compromised. These compromises may be intended to steal information for financial gain as in the theft of intellectual property or credentials that lead to the theft of financial resources, or to lie silent until instructed to cause physical or electronic damage and/or denial of services. This change in outlook has been recently confirmed by the National Security Agency [19]. The discovery of attempted and actual compromises requires an increased focus on monitoring events by manual and/or automated log monitoring, detecting unauthorized changes to a system's hardware and/or software, detecting intrusions, and/or discovering the exfiltration of sensitive information and/or attempts to send inappropriate commands to ICS/SCADA (Industrial Control System/Supervisory Control And Data Acquisition) systems.

  16. Assessing the efficiency of automatically controlled valves (ACV) for pipeline sectioning

    Energy Technology Data Exchange (ETDEWEB)

    Veiga, Leandro S. da; Silva, Marcos J.M. da; Leite, Joao Paulo de B.; Santos, Renata N.R. dos; Jardim, Rodrigo B.O.; Quinto, Thiago C. do [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    In order to mitigate the effects caused by the rupture of a gas pipeline and following ASME B 31.8 recommendations, block valves are installed in these structures. However, many transportation companies also install devices capable of infer the occurrence of an accident in a gas pipeline. The most common devices are the ones that actuate when pressure in gas pipeline reaches a low value early established (PSL) and those which close valves due to high rate of pressure drop (line-break). Line-break has the function of identifying as fast as possible the occurrence of a rupture in a gas pipeline by high rate of pressure drop in that line. Although PSL presents a later actuation when compared to the line break, it represents redundancy to the line-break system, since it is able to isolate the segment where the accident happened even if other devices or the operator had not done it before. The growing of gas pipelines transport capacity has been generated transients capable of causing an erroneous shut down of the shut down valves (SDV). The aim of this paper, therefore, is to present how the operational limits of SDV can be overcome with remote operation using SCADA System. (author)

  17. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  18. The Argentine remote monitoring and surveillance system

    International Nuclear Information System (INIS)

    Bonino, A.; Roca, J.L.; Perez, A.; Pizarro, L.; Krimer, M.; Teira, R.; Higa, Z.; Saettone, S.; Monzon, J.; Moroni, D.

    1996-01-01

    The Scientific and Technical Support Department of the Argentine National Board of Nuclear Regulation (ENREN) has developed a Remote Monitoring and Surveillance System (RMSS) that provides a media to verify state of variables related to the monitoring and surveillance activities of nuclear facilities, mainly safeguard applications. RMSS includes a variety of on site installed sensors, an authenticated radiofrequency communication link, a receiver processing unit, an active vision set and a user friendly personal computer interface to collect, view and store pertinent histories of events. A real time data base allows consulting, maintenance, updating and checking activities. RMSS could be integrated into a LAN or WAN via modem for use in a remote operation scheme. In this paper a description of the RMSS is provided. Also, an overview of the RMSS operation at one facility under safeguards belonging to the National Commission of Atomic Energy (CNEA) is presented. Results and conclusions of the system associated with this facility are given. (author). 37 figs

  19. The Argentine remote monitoring and surveillance system

    Energy Technology Data Exchange (ETDEWEB)

    Bonino, A; Roca, J L; Perez, A; Pizarro, L; Krimer, M; Teira, R; Higa, Z; Saettone, S; Monzon, J; Moroni, D [Ente Nacional Regulador Nuclear, Buenos Aires (Argentina). Dept. Apoyo Cientifico y Tecnico

    1997-12-31

    The Scientific and Technical Support Department of the Argentine National Board of Nuclear Regulation (ENREN) has developed a Remote Monitoring and Surveillance System (RMSS) that provides a media to verify state of variables related to the monitoring and surveillance activities of nuclear facilities, mainly safeguard applications. RMSS includes a variety of on site installed sensors, an authenticated radiofrequency communication link, a receiver processing unit, an active vision set and a user friendly personal computer interface to collect, view and store pertinent histories of events. A real time data base allows consulting, maintenance, updating and checking activities. RMSS could be integrated into a LAN or WAN via modem for use in a remote operation scheme. In this paper a description of the RMSS is provided. Also, an overview of the RMSS operation at one facility under safeguards belonging to the National Commission of Atomic Energy (CNEA) is presented. Results and conclusions of the system associated with this facility are given. (author). 37 figs.

  20. Computer-based supervisory control and data acquisition system for the radioactive waste evaporator

    International Nuclear Information System (INIS)

    Pope, N.G.; Schreiber, S.B.; Yarbro, S.L.; Gomez, B.G.; Nekimken, H.L.; Sanchez, D.E.; Bibeau, R.A.; Macdonald, J.M.

    1994-12-01

    The evaporator process at TA-55 reduces the amount of transuranic liquid radioactive waste by separating radioactive salts from relatively low-level radioactive nitric acid solution. A computer-based supervisory control and data acquisition (SCADA) system has been installed on the process that allows the operators to easily interface with process equipment. Individual single-loop controllers in the SCADA system allow more precise process operation with less human intervention. With this system, process data can be archieved in computer files for later analysis. Data are distributed throughout the TA-55 site through a local area network so that real-time process conditions can be monitored at multiple locations. The entire system has been built using commercially available hardware and software components

  1. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  2. Development of a Remote Handling System in an Integrated Pyroprocessing Facility

    Directory of Open Access Journals (Sweden)

    Hyo Jik Lee

    2013-10-01

    Full Text Available Over the course of a decade-long research programme, the Korea Atomic Energy Research Institute (KAERI has developed several remote handling systems for use in pyroprocessing research facilities. These systems are now used successfully for the operation and maintenance of processing equipment. The most recent remote handling system is the bridge-transported dual arm servo-manipulator system (BDSM, which is used for remote operation at the world's largest pyroprocess integrated inactive demonstration facility (PRIDE. Accurate and reliable servo-control is the basic requirement for the BDSM to accomplish any given tasks successfully in a hotcell environment. To achieve this end, the hardware and software of a digital signal processor-based remote control system were fully custom-developed and implemented to control the BDSM. To reduce the residual vibration of the BDSM, several input profiles, including input shaping, were carefully chosen and evaluated. Furthermore, a time delay controller was employed to achieve good tracking performance and systematic gain tuning. The experimental results demonstrate that the applied control algorithms are more effective than conventional approaches. The BDSM successfully completed its performance tests at a mock-up and was installed at PRIDE for real-world operation. The remote handling system at KAERI is expected to advance the actualization of pyroprocessing.

  3. Remote control systems for space heating. Product overview 2010 and recommendations - Final report; Fernsteuerungen fuer Raumheizungen. Produktuebersicht 2010 und Empfehlungen - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Geilinger, E.; Bush, E. [Bush Energie GmbH, Felsberg (Switzerland); Venzin, T. [Hochschule fuer Technik und Wirtschaft (HTW) Chur, Chur (Switzerland); Nipkow, J. [Arena, Zuerich (Switzerland)

    2010-09-15

    Saving space heating energy by remote control: A remote-controlled space heating system allows a person to lower the room temperature in homes that go unoccupied for periods of time to the lowest temperature that's safe to keep the pipes from freezing while they're away. Comfort is guaranteed because the desired room temperature or mode can be activated in time before the guests arrive, via text message, phone or the internet. As most people simply leave unoccupied homes heated, the remote-controlled system saves up to 70% of heating energy when used actively. Market overview and product features: This report presents remote control devices that are currently available on the market. Their advantages and disadvantages are discussed as well as their technical features and function. Most of them are universal remote controls that have various uses, including temperature control. The report also discusses requirements that not all the examined products meet. Some lack an emergency power supply, the possibility for manual control or the ability to check the current temperature of the home from a remote location. Better planning for remote control: The critical issue proved not to be the remote control device itself, but the heating systems. Unfortunately, they often don't provide an option to be extended by remote control. We therefore call on the manufacturers to equip all new heating systems with options for remote control. It would also be helpful and desirable to provide information on the internet or in the technical documentation on how to connect a remote control device and which products are suitable - both for existing and new heating systems. If the system cannot be retrofitted, it should be described whether and how a central remote control with room thermostat can be installed. Improving communication: In this study, remote control and heating suppliers were interviewed as well as planners, installers and users of remote-controlled heating. Their responses

  4. Diseño e implementación de un sistema SCADA en un biorreactor para la incubación de plaguicidas en la empresa palmar del rio, NEGCORPBIS S.A.

    OpenAIRE

    Barragán Delgado, Santiago Xavier; Torres Andrade, José Luis

    2016-01-01

    This project is a SCADA system whose aim is the control and monitoring from a master station that allows viewing through a man - machine interface (HMI) created using the LabVIEW software, the status of the variables of temperature, level, oxygen and pH by using sensors placed in the bioreactor. The HMI interface is made in LabVIEW software includes the same symbols and mimic diagrams tank bioreactor, alarm generation, database and historical generation. The proposed methodo...

  5. Safety installation for preventing pollution by pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Wittgenstein, G F

    1972-10-25

    A safety installation for preventing pollution by pipelines, particularly those used for transporting liquid hydrocarbons, is described. It is applicable to any pipeline, but particularly to underground or submarine pipelines, whether made of steel, plastics, or any other material. The 4 essential objects of the invention are to insure reliable prevention of pollution of the environment due to leakage of a hydrocarbon through cracks in the pipe; to evacuate the leakage flow without delay to a vessel; to signal almost instantaneously the existence of a leak; and to effect remote control of operations by which the dynamic pressure in the pipe is cancelled. Each equipped section consists of a fluid-type jacket of plastic material which surrounds the pipe, which at its ends is sealed off. It is these seals which delimit the sections. (7 claims)

  6. Using Remote Sensing Data for Integrating different Renewable Energy Sources at Coastal Site in South Italy

    DEFF Research Database (Denmark)

    Calaudi, Rosamaria; Feudo, Teresa Lo; Calidonna, Claudia Roberta

    2016-01-01

    Italian coastal sites have the advantage of favorable climatic conditions to use mixed renewable energy sources, such as solar and wind. Harbors are safe places to install wind turbines where wind conditions are almost offshore. Space-borne remote sensing can provide information to determine solar...

  7. Active remote observing system for the 1-m telescope at Tonantzintla Observatory

    Science.gov (United States)

    Bernal, Abel; Martínez, Luis A.; Hernández, Héctor; Garfias, Fernando; Ángeles, Fernando

    2006-06-01

    We have designed and installed a new active remote observing system for the 1-m, f/15 telescope at the Tonantzintla Observatory. This remote system is operated in real-time through the Internet, allowing an observer to control the building, the telescope (pointing, guiding and focusing) and the CCD image acquisition at the main and finder telescopes from the Instituto de Astronomia headquarters in Mexico City (150 KM away). The whole system was modeled within the Unified Modeling Language (UML) and the design has proved to be versatile enough for a variety of astronomical instruments. We describe the system architecture and how different subsystems (telescope control, main telescope and finder image acquisition, weather station, videoconference, etc.) that are based on different operative system platforms (Linux, Windows, uIP) have been integrated. We present the first results of an IPv6 over IPv4 tunnel. Recent remote direct imaging and spectroscopic observations have been used to test the astronomical site. We conclude that this remote system is an excellent tool for supporting research and graduated observational astronomy programs.

  8. Remote-welding technique for assembling in-pile IASCC capsule in hot cell

    International Nuclear Information System (INIS)

    Kawamata, Kazuo; Ishii, Toshimitsu; Kanazawa, Yoshiharu; Iwamatsu, Shigemi; Ohmi, Masao; Shimizu, Michio; Matsui, Yoshinori; Saito, Jun-ichi; Ugachi, Hirokazu; Kaji, Yoshiyuki; Tsukada, Takashi

    2006-01-01

    In order to investigate behavior of the irradiation assisted stress corrosion cracking (IASCC) caused by the simultaneous effects of neutron irradiation and high temperature water environment in such a light water reactor (LWR), it is necessary to perform crack growth tests in an in-pile IASCC capsule irradiated in the Japan Materials Testing Reactor (JMTR). The development of the remote-welding technique is essential for remotely assembling the in-pile IASCC capsule installing the pre-irradiated CT specimens. This report describes a new remote-welding machine developed for assembling the in-pile IASCC capsule. The remote-welding technique that the capsule tube is rotated light under the fixed torch was applied to the machine for the welding of thick and large-diameter tubes. The assembly work of four in-pile IASCC capsules having pre-irradiated CT specimens in the hot cell was succeeded for performing the crack growth test under the neutron irradiation in JMTR. The irradiation test of two capsules has been already finished in JMTR without problems. (author)

  9. Assessment of radioisotope heaters for remote terrestrial applications

    International Nuclear Information System (INIS)

    Uherka, K.L.

    1987-05-01

    This paper examines the feasibility of using radioisotope byproducts for special heating applications at remote sites in Alaska and other cold regions. The investigation included assessment of candidate radioisotope materials for heater applications, identification of the most promising cold region applications, evaluation of key technical issues and implementation constraints, and development of conceptual heater designs for candidate applications. Strontium-90 (Sr-90) was selected as the most viable fuel for radioisotopic heaters used in terrestrial applications. Opportunities for the application of radioisotopic heaters were determined through site visits to representative Alaska installations. Candidate heater applications included water storage tanks, sludge digesters, sewage lagoons, water piping systems, well-head pumping stations, emergency shelters, and fuel storage tank deicers. Radioisotopic heaters for water storage tank freeze-up protection and for enhancement of biological waste treatment processes at remote sites were selected as the most promising applications

  10. On-line internal corrosion monitoring and data management for remote pipelines: a technology update

    Energy Technology Data Exchange (ETDEWEB)

    Wold, Kjell; Stoen, Roar; Jenssen, Hallgeir [Roxar Flow Measurement AS, Stavanger (Norway); Carvalho, Anna Maria [Roxar do Brasil Ltda., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Internal corrosion monitoring of remote pipelines can be costly and demanding on resources. Online and non-intrusive monitoring directly on the pipe wall can improve the quality of measurements, make installation more convenient and allow more efficient communication of data. The purpose of this paper is to describe a non-intrusive technology, and show examples on field installations of the system. Furthermore, the non-intrusive technology data can be stored, interpreted and combined with conventional (intrusive) system information, in order to get a full picture of internal corrosion profile, corrosion rate and trends regarding the pipeline being monitored. (author)

  11. Test-bed for the remote health monitoring system for bridge structures using FBG sensors

    Science.gov (United States)

    Lee, Chin-Hyung; Park, Ki-Tae; Joo, Bong-Chul; Hwang, Yoon-Koog

    2009-05-01

    This paper reports on test-bed for the long-term health monitoring system for bridge structures employing fiber Bragg grating (FBG) sensors, which is remotely accessible via the web, to provide real-time quantitative information on a bridge's response to live loading and environmental changes, and fast prediction of the structure's integrity. The sensors are attached on several locations of the structure and connected to a data acquisition system permanently installed onsite. The system can be accessed through remote communication using an optical cable network, through which the evaluation of the bridge behavior under live loading can be allowed at place far away from the field. Live structural data are transmitted continuously to the server computer at the central office. The server computer is connected securely to the internet, where data can be retrieved, processed and stored for the remote web-based health monitoring. Test-bed revealed that the remote health monitoring technology will enable practical, cost-effective, and reliable condition assessment and maintenance of bridge structures.

  12. The European contribution to the ITER Remote Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Damiani, C., E-mail: carlo.damiani@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Annino, C.; Balagué, S.; Bates, P.; Ceccanti, F.; Di Mascio, T.; Dubus, G.; Esqué, S.; Gonzalez, C.; Lewczanin, M.; Locke, D.; Mont, L.; Olajos, K.; Ranz, R.; Shuff, R.; Puiu, A.; Van Hille, C.; Van Uffelen, M. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Choi, C.H.; Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); and others

    2014-10-15

    Highlights: •The article introduces the needs for remote maintenance in ITER. •It also discusses some of the issues related to the cultural transition from tokamaks as plasma physics to nuclear reactors. •It highlights the related cultural change and the implications on plant topology and maintenance. •Then, it presents those remote handling systems that will be procured by Europe. •The article emphasises the need of a major involvement of industries from now on. -- Abstract: For a first-of-a-kind nuclear fusion reactor like ITER, remote maintainability of neutron-activated components is one of the key aspects of plant design and operations, and a fundamental ingredient for the demonstration of long-term viability of fusion as energy source. The European Domestic Agency (EU DA, i.e. Fusion for Energy, F4E) is providing important support to the ITER Organisation (IO) in specifying the functional requirements of the Remote Handling (RH) Procurement Packages (i.e. the subsystems allocated to EU DA belonging to the overall ITER Remote Maintenance Systems IRMS), and in performing design and R and D activities – with the support of national laboratories and industries – in order to define a sound concept for these packages. Furthermore, domestic industries are being involved in the subsequent detailed design, validation, manufacturing and installation activities, in order to actually fulfil our procurement-in-kind obligations. After an introduction to ITER Remote Maintenance, this paper will present status and next stages for the RH systems allocated to EU DA, and will also illustrate complementary aspects related to cross cutting technologies like radiation tolerant components and RH control systems. Finally, the way all these efforts are coordinated will be presented together with the overall implementation scenario and key milestones.

  13. A remote-operating laser

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    A laser has been developed into an efficient tool for remote cutting of metal parts, that will be used for dismantling nuclear installations. The YAG-type laser was chosen because it allows the transfer of power through optical fibers instead of mirrors. The feasibility of the cutting of pipes (diameter: 40 mm,thickness: 3 mm) and 40 mm thick steel slates has been proven at a distance of 1 meter by using a continuous 4 kW-laser. 2 lasers have been coupled to allow the contact cutting of 60 mm thick slates (speed: 40 mm/mn) by using an equivalent power of 6 kW. A 100 mm thick slate has been cut by an equivalent power of 7 kW with a speed of 3 mm/mn. (A.C.)

  14. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  15. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L; Machado Filho, Remo Z [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros, Junior, Adory J [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  16. DESI-Detection of early-season invasives (software-installation manual and user's guide version 1.0)

    Science.gov (United States)

    Kokaly, Raymond F.

    2011-01-01

    This report describes a software system for detecting early-season invasive plant species, such as cheatgrass. The report includes instructions for installing the software and serves as a user's guide in processing Landsat satellite remote sensing data to map the distributions of cheatgrass and other early-season invasive plants. The software was developed for application to the semi-arid regions of southern Utah; however, the detection parameters can be altered by the user for application to other areas.

  17. System and Method for Providing Web-Based Remote Application Service

    OpenAIRE

    Shuen-Tai Wang; Yu-Ching Lin; Hsi-Ya Chang

    2017-01-01

    With the development of virtualization technologies, a new type of service named cloud computing service is produced. Cloud users usually encounter the problem of how to use the virtualized platform easily over the web without requiring the plug-in or installation of special software. The object of this paper is to develop a system and a method enabling process interfacing within an automation scenario for accessing remote application by using the web browser. To meet this challenge, we have ...

  18. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  19. The need for speed: Latest communications technologies instantaneously send information from oilfield to operator's head office

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2005-03-01

    The role played by satellite phones, cellular phones, telefax machines, electronic mail, desktop and laptop computers, remote computer networks, high-speed satellite links for Voice-over IP, SCADA (supervisory control and data acquisition) systems, and the Internet in the oil and natural gas industry are discussed. Examples of each technology, and the best technology to use in given situations, are reviewed. photos.

  20. Measurement of chimney dimensions and development of special tools for installation of in-chimney bracket in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong Garp; Ryu, J. S.; Lee, J. H.; Lee, Y. S; Lee, B. H.

    2000-06-01

    The in-chimney bracket is a structure which supports the guide tubes of irradiation facilities at the irradiation sites of CT, IR1, IR2, OR4 and/or OR5 in HANARO core to reduce the flow-induced vibration and the dynamic response to seismic load. It horizontally supports the middle part of lthe irradiation facilities for CT/IR sites in addition to the robot arms which had already been installed at the reactor pool liner to support the top of the facilities, and supports the top of the guide tubes for OR sites. For these purposes, the in-chimney bracket was installed in the chimney using four siphoning holes located at 70 cm below the chimney top. It is necessary to measure the dimensions of chimney before the design of in-chimney bracket because there must be manufacturing tolerances and the deformation of the chimney due to the load of the system pipes. To implement this, various special tools had been developed to measure the as-built dimensions of the chimney at the elevation of the siphoning holes, and measured the chimney dimensions and the eccentricity of the chimney center from the reactor core center. Also, a special tool was developed for the installation of the in-chimney bracket by remote operating at the pool top 10 meters apart from the chimney. The installation procedures were established through the enough installation rehearsal using the installation tool and the dummhy chimney which was fabricated to the same dimensions of the real chimney, and the installation interference problems were resolved through the preliminaly installation to the reactor chimney. Finally, the in-chimey bracket was successfully installed at the reactor chimney and is well being used for the irradiation test since the installation on May 16, 2000

  1. Improvement of remote control system of automatic ultrasonic equipment for inspection of reactor pressure vessel

    International Nuclear Information System (INIS)

    Cheong, Yong Moo; Jung, H. K.; Joo, Y. S.; Koo, K. M.; Hyung, H.; Sim, C. M.; Gong, U. S.; Kim, S. H.; Lee, J. P.; Rhoo, H. C.; Kim, M. S.; Ryoo, S. K.; Choi, C. H.; Oh, K. I.

    1999-12-01

    One of the important issues related to the nuclear safety is in-service inspection of reactor pressure vessel (RPV). A remote controlled automatic ultrasonic method is applied to the inspection. At present the automatic ultrasonic inspection system owned by KAERI is interrupted due to degradation of parts. In order to resume field inspection new remote control system for the equipment was designed and installed to the existing equipment. New ultrasonic sensors and their modules for RPV inspection were designed and fabricated in accordance with the new requirements of the inspection codes. Ultrasonic sensors were verified for the use in the RPV inspection. (author)

  2. Distributed solar photovoltaic array location and extent dataset for remote sensing object identification

    Science.gov (United States)

    Bradbury, Kyle; Saboo, Raghav; L. Johnson, Timothy; Malof, Jordan M.; Devarajan, Arjun; Zhang, Wuming; M. Collins, Leslie; G. Newell, Richard

    2016-12-01

    Earth-observing remote sensing data, including aerial photography and satellite imagery, offer a snapshot of the world from which we can learn about the state of natural resources and the built environment. The components of energy systems that are visible from above can be automatically assessed with these remote sensing data when processed with machine learning methods. Here, we focus on the information gap in distributed solar photovoltaic (PV) arrays, of which there is limited public data on solar PV deployments at small geographic scales. We created a dataset of solar PV arrays to initiate and develop the process of automatically identifying solar PV locations using remote sensing imagery. This dataset contains the geospatial coordinates and border vertices for over 19,000 solar panels across 601 high-resolution images from four cities in California. Dataset applications include training object detection and other machine learning algorithms that use remote sensing imagery, developing specific algorithms for predictive detection of distributed PV systems, estimating installed PV capacity, and analysis of the socioeconomic correlates of PV deployment.

  3. Low-level waste cement solidification design, installation, and start-up

    International Nuclear Information System (INIS)

    Jezek, G.R.

    1988-08-01

    This report describes the design, installation, and start-up activities of the Cement Solidification System (CSS) at the West Valley Demonstration Project (WVDP), West Valley, New York. The CSS, designed to operate within an existing process cell, automatically and remotely solidifies low-level nuclear waste by mixing it with Portland Type I cement. The qualified waste form mixture is placed into square, 270-litre (71-gallon) metal drums. The drums have an integral polyethylene liner to protect the carbon-steel material from potential corrosion. The CSS produces drums at a continuous operation rate of four drums per hour. All system processing data is monitored by a computerized Data Acquisition System (DAS). 6 figs

  4. Installation of spectrally selective imaging system in RF negative ion source

    International Nuclear Information System (INIS)

    Ikeda, K.; Kisaki, M.; Nagaoka, K.; Nakano, H.; Osakabe, M.; Tsumori, K.; Kaneko, O.; Takeiri, Y.; Wünderlich, D.; Fantz, U.; Heinemann, B.; Geng, S.

    2016-01-01

    A spectrally selective imaging system has been installed in the RF negative ion source in the International Thermonuclear Experimental Reactor-relevant negative ion beam test facility ELISE (Extraction from a Large Ion Source Experiment) to investigate distribution of hydrogen Balmer-α emission (H α ) close to the production surface of hydrogen negative ion. We selected a GigE vision camera coupled with an optical band-path filter, which can be controlled remotely using high speed network connection. A distribution of H α emission near the bias plate has been clearly observed. The same time trend on H α intensities measured by the imaging diagnostic and the optical emission spectroscopy is confirmed

  5. Robot vision system R and D for ITER blanket remote-handling system

    International Nuclear Information System (INIS)

    Maruyama, Takahito; Aburadani, Atsushi; Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Tesini, Alessandro

    2014-01-01

    For regular maintenance of the International Thermonuclear Experimental Reactor (ITER), a system called the ITER blanket remote-handling system is necessary to remotely handle the blanket modules because of the high levels of gamma radiation. Modules will be handled by robotic power manipulators and they must have a non-contact-sensing system for installing and grasping to avoid contact with other modules. A robot vision system that uses cameras was adopted for this non-contact-sensing system. Experiments for grasping modules were carried out in a dark room to simulate the environment inside the vacuum vessel and the robot vision system's measurement errors were studied. As a result, the accuracy of the manipulator's movements was within 2.01 mm and 0.31°, which satisfies the system requirements. Therefore, it was concluded that this robot vision system is suitable for the non-contact-sensing system of the ITER blanket remote-handling system

  6. Robot vision system R and D for ITER blanket remote-handling system

    Energy Technology Data Exchange (ETDEWEB)

    Maruyama, Takahito, E-mail: maruyama.takahito@jaea.go.jp [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan); Aburadani, Atsushi; Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan); Tesini, Alessandro [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul Lez Durance (France)

    2014-10-15

    For regular maintenance of the International Thermonuclear Experimental Reactor (ITER), a system called the ITER blanket remote-handling system is necessary to remotely handle the blanket modules because of the high levels of gamma radiation. Modules will be handled by robotic power manipulators and they must have a non-contact-sensing system for installing and grasping to avoid contact with other modules. A robot vision system that uses cameras was adopted for this non-contact-sensing system. Experiments for grasping modules were carried out in a dark room to simulate the environment inside the vacuum vessel and the robot vision system's measurement errors were studied. As a result, the accuracy of the manipulator's movements was within 2.01 mm and 0.31°, which satisfies the system requirements. Therefore, it was concluded that this robot vision system is suitable for the non-contact-sensing system of the ITER blanket remote-handling system.

  7. Remote monitoring technologies and applications. JAEA-SNL technical cooperation experience in RM for nuclear transparency

    International Nuclear Information System (INIS)

    Matter, John

    2006-01-01

    In ten years of remote monitoring cooperation, Sandia National Laboratories (SNL) and the JAEA (formerly JNC) have developed technology and demonstrated it at the Joyo Experimental Reactor. The program goals were to develop technology to support international safeguards, help evaluate and standardize the technologies for safeguards uses, and demonstrate them for potential regional cooperation. This paper described three generations of remote monitoring systems at the Joyo Fresh Storage and at one of the Joyo Spent Fuel Ponds. Communications and control methods within the facility and between the facility and the remote viewer have changed rapidly. The current configuration is similar to an international safeguards installation, but provides a foundation for transparency cooperation between the JAEA and SNL. Plans to expand this cooperation to other partners are noted. (author)

  8. Utilizing a vast and complex wireless communication network in a sustainable biosystem for the production of fiber for use in bioenergy, paper and solid wood production

    Energy Technology Data Exchange (ETDEWEB)

    Mohamed, N. [GreenWood Resources Boardman Tree Farm, Boardman, OR (United States)

    2010-07-01

    This paper reported on a tree farm in eastern Oregon that using a sophisticated communication system to irrigate and chemigate the trees. The GreenWood Resources Boardman Tree Farm (GWR BTF) covers about 100 km{sup 2}. A wireless network of 134 radio modems supports the irrigation and chemigation on 1,930 hectares of very high-value agriculture crops, including organic crops. This large network comprises 2 totally independent licensed wireless networks using a combination of Standard and High-Power industrial strength radio modems. One of the most advanced and sophisticated Irrigation Supervisory Control and Data Acquisition (I-SCADA) systems in the world uses this dual wireless network to operate the worlds largest contiguous drip irrigated farm and also the largest Tree Farm in US. This I-SCADA system has more than 2,800 sensors that remotely monitor a massive irrigation system of 19 individual pump stations with 100 pumps, 46 center pivots, 369 individual blocks of fields, 850 kilometers of buried pipe and 31,000 kilometres of drip line. The reliability of the I-SCADA system and wireless network has enabled BTF to sustain its position as a world leader in large scale drip irrigation efficiency.

  9. Remote control systems for space heating. Product overview 2010 and recommendations - Final report; Fernsteuerungen fuer Raumheizungen. Produktuebersicht 2010 und Empfehlungen - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Geilinger, E.; Bush, E. [Bush Energie GmbH, Felsberg (Switzerland); Venzin, T. [Hochschule fuer Technik und Wirtschaft (HTW) Chur, Chur (Switzerland); Nipkow, J. [Arena, Zuerich (Switzerland)

    2010-09-15

    Saving space heating energy by remote control: A remote-controlled space heating system allows a person to lower the room temperature in homes that go unoccupied for periods of time to the lowest temperature that's safe to keep the pipes from freezing while they're away. Comfort is guaranteed because the desired room temperature or mode can be activated in time before the guests arrive, via text message, phone or the internet. As most people simply leave unoccupied homes heated, the remote-controlled system saves up to 70% of heating energy when used actively. Market overview and product features: This report presents remote control devices that are currently available on the market. Their advantages and disadvantages are discussed as well as their technical features and function. Most of them are universal remote controls that have various uses, including temperature control. The report also discusses requirements that not all the examined products meet. Some lack an emergency power supply, the possibility for manual control or the ability to check the current temperature of the home from a remote location. Better planning for remote control: The critical issue proved not to be the remote control device itself, but the heating systems. Unfortunately, they often don't provide an option to be extended by remote control. We therefore call on the manufacturers to equip all new heating systems with options for remote control. It would also be helpful and desirable to provide information on the internet or in the technical documentation on how to connect a remote control device and which products are suitable - both for existing and new heating systems. If the system cannot be retrofitted, it should be described whether and how a central remote control with room thermostat can be installed. Improving communication: In this study, remote control and heating suppliers were interviewed as well as planners, installers and users of remote-controlled heating

  10. Radiation safety system (RSS) backbones: Design, engineering, fabrication and installation

    International Nuclear Information System (INIS)

    Wilmarth, J.E.; Sturrock, J.C.; Gallegos, F.R.

    1998-01-01

    The Radiation Safety System (RSS) Backbones are part of an electrical/electronic/mechanical system insuring safe access and exclusion of personnel to areas at the Los Alamos Neutron Science Center (LANSCE) accelerator. The RSS Backbones control the safety fusible beam plugs which terminate transmission of accelerated ion beams in response to predefined conditions. Any beam or access fault of the backbone inputs will cause insertion of the beam plugs in the low energy beam transport. The Backbones serve the function of tying the beam plugs to the access control systems, beam spill monitoring systems and current-level limiting systems. In some ways the Backbones may be thought of as a spinal column with beam plugs at the head and nerve centers along the spinal column. The two Linac Backbone segments and experimental area segments form a continuous cable plant over 3,500 feet from beam plugs to the tip on the longest tail. The Backbones were installed in compliance with current safety standards, such as installation of the two segments in separate conduits or tray. Monitoring for ground-faults and input wiring verification was an added enhancement to the system. The system has the capability to be tested remotely

  11. Solar Energy Prospecting in Remote Alaska: An Economic Analysis of Solar Photovoltaics in the Last Frontier State

    Energy Technology Data Exchange (ETDEWEB)

    Schwabe, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-02-11

    This report provides a high-level examination of the potential economics of solar energy in rural Alaska across a geographically diverse sample of remote Alaska Native villages throughout the state. It analyzes at a high level what combination of diesel fuel prices, solar resource quality, and photovoltaic (PV) system costs could lead to an economically competitive moderate-scale PV installation at a remote village. The goal of this analysis is to provide a baseline economic assessment to highlight the possible economic opportunities for solar PV in rural Alaska for both the public and private sectors.

  12. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  13. The JET experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: Tool-weight compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Test of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5 mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250 m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17 m high with a 10 m horizontal arm, is being manufactured. It will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. Image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum. (orig.)

  14. The Jet experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: tool-weight compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Tests of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17m high with a 10m horizontal arm, is being manufactured. It will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. Image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum

  15. The JET experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: tool-weigth compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Tests of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5 mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250 m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17 m high with a 10 m horizontal arm, is being manufactured. it will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum. (author). 14 refs.; 12 figs

  16. The Impact of Water Quality on the Use of Solar Water Heaters in Remote Islands of Taiwan

    Directory of Open Access Journals (Sweden)

    Kai-Chun Fan

    2016-11-01

    Full Text Available The use of solar water heaters (SWHs in Taiwan’s remote islands has been subjected to scaling and, in particular, corrosion problems due to sources of water. In this study, four different water quality indices including the Langelier Saturation Index (LSI, the Ryznar Stability Index (RSI, the Puckorius Scaling Index (PSI, and the Larson-Skold Corrosive Index (LSCI were employed to assess the scaling and corrosion tendencies in SWHs caused by tap water and ground water in the Penghu, Kinmen, and Lienchiang counties, each of which is constituted of several remote islands. In general, the LSI, the RSI, and the PSI results show a slight scaling tendency in Penghu, but a corrosion tendency in Kinmen and Lienchiang. Nevertheless, all LSCI results show a serious steel corrosion tendency in these three counties. In addition, the chloride ion (Cl− concentrations are higher than 45 mg/L in either tap water (except for the Lieyu township in Kinmen or ground water. This fact resulted in serious corrosion problems, as found in the currently installed SWHs, which were mainly made from 304 stainless steel. The metals with higher corrosion resistance to chloride ions are required in the manufacture of SWHs to be installed on these three remote-island counties.

  17. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  18. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  19. Application of wireless LAN technology to remote monitoring for inspection equipment

    International Nuclear Information System (INIS)

    Ishiyama, Koichi; Kimura, Takashi; Miura, Yasushi; Yamaguchi, Katsuhiro; Kabuki, Toshihide

    2011-01-01

    To support inspections under an Integrated Safeguards regime into Tokai Reprocessing Plant (TRP), the IAEA suggested making use of Remote Monitoring (RM) capabilities to the inspection equipment (surveillance camera and NDA systems) installed in the spent fuel storage area at TRP. Since TRP had no pre-prepared cabling infrastructure for data transmission in the spent fuel storage area, the option of wireless LAN was chosen over the telephone line due to its lower installation costs. Feasibility studies and tests were performed by TRP on communication and particularly on long-term continuous communication using wireless LAN equipment composed of APs (AP: Access Point) and the external antennas for introducing wireless LAN technology to RM. As a result it was recognized that wireless LAN has enough ability to communicate for long periods of time and consequently the IAEA installed the AP and the external antenna to each inspection equipment and the wireless LAN technology was applied for RM. In this paper, the summary of each test and the results are reported. (author)

  20. Wind generation systems for remote communities: market assessment and guidelines for wind turbines selection

    International Nuclear Information System (INIS)

    Brothers, C.

    1993-06-01

    Wind technology and its market potential in remote communities of the Canadian North were discussed. These communities, unserviced by the main utility electricity grid, generate their own electricity using high quality, expensive diesel fuel to power diesel driven generators. The logistics of delivering fuel to these remote communities is an expensive operation. Wind resource in many of these communities is substantial and wind energy is seen as a prime candidate for supplying electricity to many potential sites in the Arctic and also areas in Quebec and Newfoundland. However, the severe service (i.e., cold climate, remote locations with limited facilities) requires special considerations to ensure that equipment installed performs reliably. This report described some demonstration projects in northern Canada over the last ten years, where an understanding of the special needs of wind turbines in remote areas has been developed. A guide which assessed the suitability of wind turbines for Arctic applications was included to assist organisations in preparing requirements to be used in acquiring wind turbines for use in cold regions. Refs., tabs., figs

  1. Improvement of remote control system of automatic ultrasonic equipment for inspection of reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Cheong, Yong Moo; Jung, H. K.; Joo, Y. S.; Koo, K. M.; Hyung, H.; Sim, C. M.; Gong, U. S.; Kim, S. H.; Lee, J. P.; Rhoo, H. C.; Kim, M. S.; Ryoo, S. K.; Choi, C. H.; Oh, K. I

    1999-12-01

    One of the important issues related to the nuclear safety is in-service inspection of reactor pressure vessel (RPV). A remote controlled automatic ultrasonic method is applied to the inspection. At present the automatic ultrasonic inspection system owned by KAERI is interrupted due to degradation of parts. In order to resume field inspection new remote control system for the equipment was designed and installed to the existing equipment. New ultrasonic sensors and their modules for RPV inspection were designed and fabricated in accordance with the new requirements of the inspection codes. Ultrasonic sensors were verified for the use in the RPV inspection. (autho0008.

  2. Secure Automated Fabrication: an overview of remote breeder fuel fabrication

    International Nuclear Information System (INIS)

    Nyman, D.H.; Graham, R.A.

    1983-10-01

    The Secure Automated Fabrication (SAF) line is an automated, remotely controlled breeder fuel pin fabrication process which is to be installed in the Fuels and Materials Examination Facility (FMEF). The FMEF is presently under construction at Hanford and is scheduled for completion in 1984. The SAF line is scheduled for startup in 1987 and will produce mixed uranium-plutonium fuel pins for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). The fabrication line and support systems are described

  3. Remote handling equipment for laboratory research of fuel reprocessing in Nuclear Research Institute at Rez

    International Nuclear Information System (INIS)

    Fidler, J.; Novy, P.; Kyrs, M.

    1985-04-01

    Laboratory installations were developed for two nuclear fuel reprocessing methods, viz., the solvent extraction process and the fluoride volatility process. The apparatus for solvent extraction reprocessing consists of a pneumatically driven rod-chopper, a dissolver, mixer-settler extractors, an automatic fire extinguishing device and other components and it was tested using irradiated uranium. The technological line for the fluoride volatility process consists of a fluorimater, condensers, sorption columns with NaF pellets and a distillation column for the separation of volatile fluorides from UF 6 . The line has not yet been tested using irradiated fuel. Some features of the remote handling equipment of both installations are briefly described. (author)

  4. Fundamentals for remote condition monitoring of offshore wind turbines

    DEFF Research Database (Denmark)

    McGugan, Malcolm; Larsen, Gunner Chr.; Sørensen, Bent F.

    In the future, large wind turbines will be placed offshore in considerable numbers. Since access will be difficult and costly, it is preferable to use monitoring systems to reduce the reliance on manual inspection. The motivation for the effort reported here is to create the fundamental basis...... of the wind turbine blades that can integrate with existing SCADA tools to improve management of large offshore wind farms, and optimise the manual inspection/maintenance effort. Various sensor types, which have previously been identified as technically (and economically) capable of detecting the early...

  5. Remote manipulator experience in target train maintenance at Fermilab

    International Nuclear Information System (INIS)

    Butala, S.W.

    1984-01-01

    When Fermilab was designed in the late 1960's and early 1970's, it was anticipated that Neutrino target train servicing could be costly in terms of personnel radiation exposure. This was based in part on the expectation that target intensities of at least 1E13 protons/pulse would be required to produce several neutrino interactions in a large bubble chamber detector. This was indeed later proven to be the case and historically the Neutrino beamline has been targeted with about one half of the protons available from the Main Ring. It was believed that much of the occupational radiation dose from the Neutrino Area could be spared by utilization of a remote manipulator system, which was eventually installed. It is the purpose of this report to examine the use of the Fermilab remote manipulator system and evaluate its cost effectiveness and success as an ALARA (As Low As Reasonably Achievable) tool. 16 references, 11 figures

  6. Development of a mobile robot for remote radiation measurement

    International Nuclear Information System (INIS)

    Sarkar, Ushnish; Saini, Surendra Singh; Swaroop, Tumapala Teja; Sreejith, P.; Kumar, Ravinder; Ray, Debasish Datta

    2016-01-01

    Remote measurement of radiation using mobile robots is recommended in nuclear installations. For this purpose various robots have been developed that carry a radiation sensor. However since the robot has to go very near to the source of radiation, the life of the robot's components is compromised due to high level of absorbed dose. It was earlier managed to increase the life expectancy of remote radiation measurement robots by allowing the sensor to be placed on an extendable telescopic assembly; analogous to a health physicist taking measurements using a Teletector. The first prototype developed had stair climbing capabilities but it was found to be over dimensioned for various potential applications. A significant use of such robots is in taking measurements at nuclear reprocessing facilities having narrow cluttered pathways. This required development of a new version of the robot capable of negotiating the narrow pathways of such facilities. This paper describes the different aspects of the development of the mobile robot system with flexible radiation sensing capabilities

  7. Remote controlled tool systems for nuclear sites have subsea applications

    International Nuclear Information System (INIS)

    Bath, B.; Yemington, C.; Kuhta, B.

    1995-10-01

    Remotely operated underwater tool systems designed to operate in Nuclear Fuel Storage Basins can be applied to deep water, subsea oilfield applications. Spent nuclear fuel rods re stored underwater in large indoor swimming pool-like facilities where the water cover shields the workers from the radiation. This paper describes three specialized tooling systems that were designed and built by Sonsub for work at the Department of Energy's Hanford site. The Door Seal Tool removed an existing seal system, cleaned a 20 ft. tall, carbon steel, underwater hatch and installed a new stainless steel gasket surface with underwater epoxy. The Concrete Sampling Tool was built to take core samples from the vertical, concrete walls of the basins. The tool has three hydraulic drills with proprietary hollow core drill bits to cut and retrieve the concrete samples. The Rack Saw remotely attached itself to a structure, cut a variety of steel shapes and pipes, and retained the cut pieces for retrieval. All of these systems are remotely operated with onboard video cameras and debris collection systems. The methods and equipment proven in this application are available to refurbish sealing surfaces and to drill or sample concrete in offshore oil field applications

  8. A Robust WLS Power System State Estimation Method Integrating a Wide-Area Measurement System and SCADA Technology

    Directory of Open Access Journals (Sweden)

    Tao Jin

    2015-04-01

    Full Text Available With the development of modern society, the scale of the power system is rapidly increased accordingly, and the framework and mode of running of power systems are trending towards more complexity. It is nowadays much more important for the dispatchers to know exactly the state parameters of the power network through state estimation. This paper proposes a robust power system WLS state estimation method integrating a wide-area measurement system (WAMS and SCADA technology, incorporating phasor measurements and the results of the traditional state estimator in a post-processing estimator, which greatly reduces the scale of the non-linear estimation problem as well as the number of iterations and the processing time per iteration. This paper firstly analyzes the wide-area state estimation model in detail, then according to the issue that least squares does not account for bad data and outliers, the paper proposes a robust weighted least squares (WLS method that combines a robust estimation principle with least squares by equivalent weight. The performance assessment is discussed through setting up mathematical models of the distribution network. The effectiveness of the proposed method was proved to be accurate and reliable by simulations and experiments.

  9. Remote Control of TJ-II Diagnostics; Control Remoto de Diagnosticos del Dispositivo TJ-II

    Energy Technology Data Exchange (ETDEWEB)

    Lopez Sanchez, A.; Vega, J.; Montoro, A.; Encabo, J.

    2001-07-01

    The present paper is about the design and development of ten remote control diagnostic systems used in the study of plasma fusion in the TJ-II device installed at CIEMAT. This development goes from the definition of sensors and devices necessary in carrying out these remote controls, to its assembly, wiring, development of electronic circuits inserted between sensors and PLC, development of programs for these PLC, connections and administration of the real time automation network, and later development of the necessary programs via the appropriate software tools for web access through a navigator to a specific web page, allowing visual and real time access over the auxiliary systems that make up all the diagnostics. (Author)

  10. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  11. Economical wind powered bioventing systems successfully applied at remote locations

    International Nuclear Information System (INIS)

    Graves, D.; Wilson, B.; Walker, K.

    1996-01-01

    Wind-powered bioventing systems were designed to operate at remote locations in the absence of electrical power. Laboratory measurements of soil respiration under bioventing conditions indicated the biodegradation of up to 25 mg of weathered diesel per kg of site soil per day. Further testing demonstrated the potential for harnessing wind-power to stimulate air movement through vadose zone soil. Several wind-powered bioventing systems were installed near Nome, Alaska. In situ respiration tests, soil gas composition measurements and measurable pressure changes in the soil indicated that the systems were capable of aerating the soil. Diesel range oil measurements indicated contaminant reductions up to 90% after only two treatments seasons. The results demonstrate the effectiveness of wind-powered biovents. The low cost, low maintenance, and simplicity of the biovents make them a very attractive treatment option for windy, remote sites with unsaturated soil impacted by biodegradable contaminants

  12. Remotely-Controlled Shear for Dismantling Highly Radioactive Tools In Rokkasho Vitrification Facility - 12204

    Energy Technology Data Exchange (ETDEWEB)

    Mitsui, Takashi; Sawa, Shusuke; Sadaki, Akira; Awano, Toshihiko [IHI Corporation, 1 Shin-Nakahara-cho, Isogo-ku, Yokohama, Kanagawa (Japan); Cole, Matt [S.A. Technology Inc, 3985 S. Lincoln Ave., Ste. 100, Loveland CO 80537 (United States); Miura, Yasuhiko; Ino, Tooru [Japan Nuclear Fuel Limited, 4-108, Aza Okitsuke, Oaza Obuchi, Rokkasho-Mura, Kamikita-gun, Aomori (Japan)

    2012-07-01

    A high-level liquid waste vitrification facility in the Japanese Rokkasho Reprocessing Plant (RRP) is right in the middle of hot commissioning tests toward starting operation in fall of 2012. In these tests, various tools were applied to address issues occurring in the vitrification cell. Because of these tools' unplanned placement in the cell it has been necessary to dismantle and dispose of them promptly. One of the tools requiring removal is a rod used in the glass melter to improve glass pouring. It is composed of a long rod made of Inconel 601 or 625 and has been highly contaminated. In order to dismantle these tools and to remotely put them in a designated waste basket, a custom electric shear machine was developed. It was installed in a dismantling area of the vitrification cell by remote cranes and manipulators and has been successfully operated. It can be remotely dismantled and placed in a waste basket for interim storage. This is a very good example of a successful deployment of a specialty remote tool in a hot cell environment. This paper also highlights how commissioning and operations are done in the Japanese Rokkasho Reprocessing Plant. (authors)

  13. Application and performance of remote bioventing systems powered by wind

    International Nuclear Information System (INIS)

    Graves, D.; Hague, K.; Wilson, B.; Dillon, T. Jr.; Klein, J.; McLaughlin, J.; Olson, G.

    1995-01-01

    Wind-powered bioventing systems were designed to operate at remote locations in the absence of electrical power. Laboratory measurements of soil respiration under bioventing conditions indicated the biodegradation of up to 25 mg of weathered diesel per kg of site soil per day. Further testing demonstrated the potential for harnessing wind-power to stimulate air movement through vadose zone soil. A 12-in. attic turbine in a 10-mph wind was found to generate 0.025 in. of water vacuum with an airflow of approximately 2.5 ft 3 per min. Two wind-powered bioventing systems were installed near Nome, Alaska. In situ respiration tests and soil gas composition measurements indicated that the systems were capable of aerating the soil. Measurements of diesel-range organics (DRO) taken during installation and at the end of the treatment season show concentration reductions of 29 and 87% at the two sites

  14. The remote system explorer modern developer tools for the system I

    CERN Document Server

    Yantzi, Don

    2008-01-01

    Focusing exclusively on the Remote System Explorer (RSE) within the popular WebSphere Development Studio Client (WDSC), this comprehensive study contains both technical and practical tutorials. Allowing developers to use modern techniques within several programs, this survey covers topics such as getting started, terminology, installation, managing i5/OS objects and members, editing, compiling, and debugging. Each chapter features key views, actions, keyboard shortcuts, and troubleshooting tips. Illustrated with countless examples and detailed screen shots, this reference makes the RSE accessi

  15. A practical experience of using special remote handling tools on JET

    International Nuclear Information System (INIS)

    Mills, S.F.; Schreibmaier, J.; Tesini, A.; Wykes, M.

    1987-01-01

    Over 50 cutting and 200 UHV welding operations were made during the installation of new water cooled belt limiters and ICRF Antennae into the JET Vacuum Vessel. This work was performed by the hands-on use of 45 special tools which have been specifically designed for use with the Mascot servomanipulator in preparation for the JET D-T phase when all maintenance will be performed remotely. This paper reports on the techniques used and the performance of the tools. (author)

  16. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  17. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  18. Dialing long distance : communications to northern operations like the MGP require sophisticated satellite networks for voice, data

    Energy Technology Data Exchange (ETDEWEB)

    Cook, D.

    2006-04-15

    Telecommunications will play a major role in the construction of the Mackenzie Gas Project due to the remoteness of its location and the volume of communication data required to support the number of people involved and the amount of construction activity. While suppliers for communications tools have not yet been identified, initial telecommunications plans call for the installation of communication equipment at all camps, major facility sites and construction locations. Equipment will be housed in self-contained, climate-controlled buildings called telecommunication service modules (TSMs), which will be connected to each other as well as to existing public communications networks. The infrastructure will support telephone and fax systems; Internet and electronic mail services; multiple channel very high frequency radios; air-to-ground communication at airstrips and helipads; ship-to-shore at barge landings; closed circuit television; satellite community antenna television; CBC radio broadcast; public address systems; security systems; and supervisory control and data acquisition (SCADA) systems. An Internet Protocol (IP) network with a voice telephone system will be implemented along with a geostationary orbit satellite network. Satellite servers and real-time data services will be used. Car kits that allow call and battery-operated self-contained telemetry devices designed to communicate via a satellite system have been commissioned for the project that are capable of providing cost-efficient and reliable asset tracking and fleet management in remote regions and assisting in deployment requirements. It was concluded that many of today's mega-projects are the driving factors behind new telecommunications solutions in remote areas. 1 fig.

  19. Mechanism of remote controlled after-loading radiotherapy unit

    International Nuclear Information System (INIS)

    Morimoto, Masaki

    1980-01-01

    Employing a small amount of Radium-226 or Cesium-137 source was to be used hitherto for the treatment of carcinoma of the uterine cervix in used After-loading techniques. It involved, however, radiation risk to the staff and patient. The long treatment time are also a pain (strain) on the patient. In recent years, we have developed a remote control after-loading unit, which was named as RALSTRON, which was complete eliminated the disadvantage of conventional radium therapy. This unit also has disadvantage, however, that the design for the remote after-loader for intracavitary applicators present considerable difficulties, because many sources of different active lengths and loading patterns are required. A solution to this problem was carried out by using small point source, placed in Tandem applicator, of high activity and moving them back slowly during the treatment. Recently, this unit was installed many hospitals about 80 units in Japan, and are used. In this paper are given about a mechanism and safety deviced of this unit. (author)

  20. A Remote Monitoring System for Greenhouse Based on the Internet of Things

    Directory of Open Access Journals (Sweden)

    Xu Zhenfeng

    2016-01-01

    Full Text Available The Internet of Things (IOT is considered as a great opportunity for the development in the information field nowadays, and has been applied widely in many fields. The IOT can be applied to monitor and control the microclimate factors of greenhouse remotely. In this paper, a wireless monitoring network is designed in the perception layer of the IOT. The nodes are developed based on the Mica2 hardware and the TinyOS software. The LPL (low power listening technology is adopted to reduce the energy consumption of the relay node which is powered by a solar panel. The ACK (Acknowledgement mechanism is used in the software to improve the quality of wireless communications. A remote monitoring terminal is developed by using Java technology. The monitoring terminal is easy to operate with good interactivity. The system has been installed in a glass greenhouse. The actual operation results show that the system is stable and reliable, which lays a good foundation for the development of remote control strategies in future.

  1. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  2. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  3. Electromechanical three-axis development for remote handling in the Hot Experimental Facility

    International Nuclear Information System (INIS)

    Garin, J.; Bolfing, B.J.; Satterlee, P.E.; Babcock, S.M.

    1981-01-01

    A three-axis closed-loop position control system has been designed and installed on an overhead bridge, carriage, tube hoist for automotive positioning of manipulation at a remotely maintained work site. The system provides accurate (within 3 min) and repeatable three-axis positioning of the manipulator. The position control system has been interfaced to a supervisory minicomputer system that provides teach-playback capability of manipulator positioning and color graphic display of the three-axis system position

  4. Application of remote monitoring technology in landslides in the Luoshan mining area

    Energy Technology Data Exchange (ETDEWEB)

    Man-chao He; Zhi-gang Tao; Bin Zhang [China University of Mining & Technology, Beijing (China). Research Center of Geotechnical Engineering

    2009-09-15

    With the scale extending of mining, the landslide disaster in the earth's surface will become more and more serious, and these landslide disasters are being threatened to the sustainable safe mining of the underground mine and the open-pit mine. Based on the theory that sliding force is greater than the shear resistance (resisting force) at the potential slip surface is the necessary and sufficient condition to occur the landslide as the sliding criterion, the principle and method for sliding force remote monitoring is presented, and the functional relationship between the human mechanical quantity and the natural sliding force is derived, hereby, the natural sliding force can be calculated according to the human mechanical quantity. Based on above principle and method, a new system of landslide remote monitoring is designed and 53 systems are installed on the landslide body in the Luoshan mining area, which make up the landslide remote monitoring network. According to the results of field test around 8 months, monitoring curves between sliding force and time are obtained, which can describe and forecast the develop trend of landslide. According to above analysis, the results show that this system has some following advantages: (1) real-time monitoring; (2) remote intelligent transmission; (3) landslides early warning. 11 refs., 8 figs., 1 tab.

  5. Preliminary installment of total picture archiving and communication systems

    International Nuclear Information System (INIS)

    Takenaka, E.; Takanashi, S.; Suda, Y.; Furui, S.; Yoshida, H.; Hosaka, Y.; Fukui, T.

    1990-01-01

    This paper studied the image quality of various medical digital images and to install a small but total image management and communication system to file images. The system consists of a filing system with a laser scanning digitizer (2,000 x 2,000 x 8 bits), an optical disk (3.8 GB), two HD CRTs, and a 1.6 GB magnetic disk. This system can file on-line the images from a second filing system with FCR (on-line) and a Konica direct imaging system during treatment and follow-up, a CCD TV simulator system for a remote after-loading system, a dose map on CT and MR images through a self-made treatment planning system on the PC level, a CCD TV (RGB) system for local lesions, and portal images, through the imaging plate, for brachytherapy

  6. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  7. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  8. Assembly, installation and commissioning of the new halo current sensors system for JET

    International Nuclear Information System (INIS)

    Peruzzo, S.; Fullard, K.; Grando, L.; Huntley, S.; Lam, N.; Pomaro, N.; Riccardo, V.; Sonato, P.

    2007-01-01

    This paper presents the status of the halo current sensors (HCS) diagnostic enhancement project for JET. The HCS system includes four sets of probes located in four octants equally spaced along the toroidal coordinate, with a total of 24 Rogowski coils and 5 toroidal field pick-up coils. These sensors are meant to provide a measurement of the current flowing through each single tile of the upper dump plate and an estimate of the total poloidal halo current flowing through the first wall structures. The HCS system was installed in the JET vacuum vessel in March 2005 during the 2004/2005 shutdown and the acquisition of signals started during the restart phase of the machine in autumn 2005. This paper firstly summarises the critical aspects encountered during the final phase of the procurement of the system and the in-vessel installation, which was accomplished using the remote handling system. The paper then focuses on the analysis and interpretation of the data collected during the functional commissioning of the new system, carried out during the restart phase of the machine preceding the experimental campaigns

  9. The dismantling of nuclear installations in the Grenoble CEA centre - Press book 2013

    International Nuclear Information System (INIS)

    Laveissiere, Stephane; Coronini, Vincent

    2013-01-01

    After having outlined the importance of the project for the Grenoble CEA centre, this document presents the objectives, issues and challenges of dismantling activities performed on various nuclear installations located in the CEA centre of Grenoble. Objectives are presented in terms of agenda, predicted production of radioactive wastes, budget, personnel and steering committee. The various nuclear installations are presented: experimental reactors (Melusine, Siloe, Siloette), LAMA (laboratory of analysis of active materials), STED (station for the treatment of effluents and wastes). The safety and protection of workers is addressed in terms of protection and monitoring measures, and of exposure to radiations. The next part deals with the monitoring of the environment (actors, history of control of the centre's releases, control points, releases, atmosphere monitoring, and hydrological monitoring). A second part presents the global strategy of the CEA for its activities of sanitation and nuclear dismantling: present operations, dismantling activities in Fontenay-aux-Roses and in Marcoule, economic organization, contribution of advanced technology in radiological measurement and control, simulation and modelling, decontamination techniques, cutting operations, and remotely controlled operations

  10. Analytical chemistry equipment for radioactive products; Installation de chimie analytique pour produits radioactifs

    Energy Technology Data Exchange (ETDEWEB)

    Douis, M; Guillon, A; Laurent, H; Sauvagnac, R [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1959-07-01

    The report deals with a shielded enclosure, hermetic, for analytical examination and handling of radioactive products. Remote handling for the following is provided: pipette absorption - weighing - centrifuging - desiccation - volumetric - pH measurement - potentiometric - colorimetric - polarographic. The above list is not restrictive: the enclosure is designed for the rapid installation of other equipment. Powerfully ventilated and screened to 400 m-curies long life fission product levels by 5 cm of lead, the enclosure is fully safe to the stated level. (author) [French] La presente communication decrit une enceinte etanche et blindee permettant un travail et un controle analytique sur des produits radioactifs. Les techniques suivantes sont adaptees pour une manipulation a distance: pipettage, pesees, centrifugation, dessiccation, volumetrie, mesure de pH, potentiometrie, colorimetrie, polarographie. Cette liste n'est pas limitative. La conception de l'installation permet la mise en place rapide d'autres appareils. Protegee par 5 cm de plomb et fortement ventilee, elle donne toute securite de manipulation jusqu'a un niveau d'activite 400 mcuries en produits de fission a vie longue. (auteur)

  11. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  12. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  13. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  14. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  15. A New Cellular Architecture for Information Retrieval from Sensor Networks through Embedded Service and Security Protocols

    Directory of Open Access Journals (Sweden)

    Aamir Shahzad

    2016-06-01

    Full Text Available Substantial changes have occurred in the Information Technology (IT sectors and with these changes, the demand for remote access to field sensor information has increased. This allows visualization, monitoring, and control through various electronic devices, such as laptops, tablets, i-Pads, PCs, and cellular phones. The smart phone is considered as a more reliable, faster and efficient device to access and monitor industrial systems and their corresponding information interfaces anywhere and anytime. This study describes the deployment of a protocol whereby industrial system information can be securely accessed by cellular phones via a Supervisory Control And Data Acquisition (SCADA server. To achieve the study goals, proprietary protocol interconnectivity with non-proprietary protocols and the usage of interconnectivity services are considered in detail. They support the visualization of the SCADA system information, and the related operations through smart phones. The intelligent sensors are configured and designated to process real information via cellular phones by employing information exchange services between the proprietary protocol and non-proprietary protocols. SCADA cellular access raises the issue of security flaws. For these challenges, a cryptography-based security method is considered and deployed, and it could be considered as a part of a proprietary protocol. Subsequently, transmission flows from the smart phones through a cellular network.

  16. A New Cellular Architecture for Information Retrieval from Sensor Networks through Embedded Service and Security Protocols.

    Science.gov (United States)

    Shahzad, Aamir; Landry, René; Lee, Malrey; Xiong, Naixue; Lee, Jongho; Lee, Changhoon

    2016-06-14

    Substantial changes have occurred in the Information Technology (IT) sectors and with these changes, the demand for remote access to field sensor information has increased. This allows visualization, monitoring, and control through various electronic devices, such as laptops, tablets, i-Pads, PCs, and cellular phones. The smart phone is considered as a more reliable, faster and efficient device to access and monitor industrial systems and their corresponding information interfaces anywhere and anytime. This study describes the deployment of a protocol whereby industrial system information can be securely accessed by cellular phones via a Supervisory Control And Data Acquisition (SCADA) server. To achieve the study goals, proprietary protocol interconnectivity with non-proprietary protocols and the usage of interconnectivity services are considered in detail. They support the visualization of the SCADA system information, and the related operations through smart phones. The intelligent sensors are configured and designated to process real information via cellular phones by employing information exchange services between the proprietary protocol and non-proprietary protocols. SCADA cellular access raises the issue of security flaws. For these challenges, a cryptography-based security method is considered and deployed, and it could be considered as a part of a proprietary protocol. Subsequently, transmission flows from the smart phones through a cellular network.

  17. A New Cellular Architecture for Information Retrieval from Sensor Networks through Embedded Service and Security Protocols

    Science.gov (United States)

    Shahzad, Aamir; Landry, René; Lee, Malrey; Xiong, Naixue; Lee, Jongho; Lee, Changhoon

    2016-01-01

    Substantial changes have occurred in the Information Technology (IT) sectors and with these changes, the demand for remote access to field sensor information has increased. This allows visualization, monitoring, and control through various electronic devices, such as laptops, tablets, i-Pads, PCs, and cellular phones. The smart phone is considered as a more reliable, faster and efficient device to access and monitor industrial systems and their corresponding information interfaces anywhere and anytime. This study describes the deployment of a protocol whereby industrial system information can be securely accessed by cellular phones via a Supervisory Control And Data Acquisition (SCADA) server. To achieve the study goals, proprietary protocol interconnectivity with non-proprietary protocols and the usage of interconnectivity services are considered in detail. They support the visualization of the SCADA system information, and the related operations through smart phones. The intelligent sensors are configured and designated to process real information via cellular phones by employing information exchange services between the proprietary protocol and non-proprietary protocols. SCADA cellular access raises the issue of security flaws. For these challenges, a cryptography-based security method is considered and deployed, and it could be considered as a part of a proprietary protocol. Subsequently, transmission flows from the smart phones through a cellular network. PMID:27314351

  18. Advanced functions using VBA for the Yacuiba Rio Grande (GASYRG) gas pipeline; Funcoes avancadas usando VBA no gasoduto Yacuiba Rio Grande

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2005-07-01

    The Yacuiba - Rio Grande Gas Pipeline is remote operated from the Supervision and Control Center (CSC) located in the offices of Transierra S.A. in Santa Cruz de la Sierra, Bolivia. This operation is made by means of a SCADA system based on satellite communication, it starts off at Yacuiba and finishes in Rio Grande, where it deliveries the export gas to Brazil. An Advanced Functions application was developed at the Transierra's CSC, This application runs under Intellution's iFix (HMI of the SCADA) in a Windows platform. It gathers transportation data in real time and by means of a mathematical process and a steady state simulation it makes the following on line calculations: Line Pack, Leak Detection, Transport Efficiency, Pressure Estimate in intermediate points and gas real velocity in the pipeline. The application was developed using Visual BASIC for Applications (VBA) (included in Intellution's iFix) and by means of an interphase to a historical server (iHistorian, Intellution) it is possible to store the obtained results, this integration also allows for the creation of graphs and trends with a great flexibility and to activate alarm points. With a practically null investment, this application replaces high cost specialized packages that are accessories to simulation or SCADA applications. (author)

  19. Remote online process measurements by a fiber optic diode array spectrometer

    International Nuclear Information System (INIS)

    Van Hare, D.R.; Prather, W.S.; O'Rourke, P.E.

    1986-01-01

    The development of remote online monitors for radioactive process streams is an active research area at the Savannah River Laboratory (SRL). A remote offline spectrophotometric measurement system has been developed and used at the Savannah River Plant (SRP) for the past year to determine the plutonium concentration of process solution samples. The system consists of a commercial diode array spectrophotometer modified with fiber optic cables that allow the instrument to be located remotely from the measurement cell. Recently, a fiber optic multiplexer has been developed for this instrument, which allows online monitoring of five locations sequentially. The multiplexer uses a motorized micrometer to drive one of five sets of optical fibers into the optical path of the instrument. A sixth optical fiber is used as an external reference and eliminates the need to flush out process lines to re-reference the spectrophotometer. The fiber optic multiplexer has been installed in a process prototype facility to monitor uranium loading and breakthrough of ion exchange columns. The design of the fiber optic multiplexer is discussed and data from the prototype facility are presented to demonstrate the capabilities of the measurement system

  20. Deployment and Maintenance of Wave Energy Converters at the Lysekil Research Site: A Comparative Study on the Use of Divers and Remotely-Operated Vehicles

    Directory of Open Access Journals (Sweden)

    Flore Rémouit

    2018-04-01

    Full Text Available Ocean renewable technologies have been rapidly developing over the past years. However, current high installation, operation, maintenance, and decommissioning costs are hindering these offshore technologies to reach a commercialization stage. In this paper we focus on the use of divers and remotely-operated vehicles during the installation and monitoring phase of wave energy converters. Methods and results are based on the wave energy converter system developed by Uppsala University, and our experience in offshore deployments obtained during the past eleven years. The complexity of underwater operations, carried out by either divers or remotely-operated vehicles, is emphasized. Three methods for the deployment of wave energy converters are economically and technically analyzed and compared: one using divers alone, a fully-automated approach using remotely-operated vehicles, and an intermediate approach, involving both divers and underwater vehicles. The monitoring of wave energy converters by robots is also studied, both in terms of costs and technical challenges. The results show that choosing an autonomous deployment method is more advantageous than a diver-assisted method in terms of operational time, but that numerous factors prevent the wide application of robotized operations. Technical solutions are presented to enable the use of remotely-operated vehicles instead of divers in ocean renewable technology operations. Economically, it is more efficient to use divers than autonomous vehicles for the deployment of six or fewer wave energy converters. From seven devices, remotely-operated vehicles become advantageous.

  1. Data acquisition and control system in a heavy water detritiation installation

    International Nuclear Information System (INIS)

    Stefan, Iuliana; Balteanu, Ovidiu; Retevoi, Carmen; Stefan, Liviu

    2002-01-01

    The experimental installation for extracting tritium and deuterium from the tritiated heavy water used as moderator in CANDU type nuclear reactors is described. The separated tritium of high purity can be used in the fusion reactors of the future or in various laboratory researches. The fluids implied in operating this installation require special safety measures to be taken to protect both the operational personnel and the environment. Accordingly, in the technologic room no personnel is allowed and hence parameter monitoring, analyses and the testing must be done by remote control equipment. The computers for monitoring, warning and testing, as well as the sensors are housed in the data acquisition room, separated from the control room. The values generated by the process variables are converted in electrical or pneumatic signals and subsequently transmitted to the subsystems of monitoring, control and protection. Data acquisition in the control room is ensured by a computer provided with a FieldPoint interface. So, the connection between I/O modules from the data acquisition room and the computer ensures a 115.2 kb/s speed. Measured values of the parameters are recorded and displayed in the control room. Here these are compared with preset limits of the process parameters and in case of abnormal behavior, an alarm is triggered both optically and acoustically. At the same time, the program which controls the inputs and the outputs makes decisions and issues corrective or preventive commands for the technological process or installation protection, respectively. A diagram illustrating the monitoring, using a LabView platform is presented

  2. Integrating a work-flow engine within a commercial SCADA to build end users applications in a scientific environment

    International Nuclear Information System (INIS)

    Ounsy, M.; Pierre-Joseph Zephir, S.; Saintin, K.; Abeille, G.; Ley, E. de

    2012-01-01

    To build integrated high-level applications, SOLEIL is using an original component-oriented approach based on GlobalSCREEN, an industrial Java SCADA. The aim of this integrated development environment is to give SOLEIL's scientific and technical staff a way to develop GUI (Graphical User Interface) applications for external users of beamlines. These GUI applications must address the two following needs: monitoring and supervision of a control system and development and execution of automated processes (as beamline alignment, data collection and on-line data analysis). The first need is now completely answered through a rich set of Java graphical components based on the COMETE library and providing a high level of service for data logging, scanning and so on. To reach the same quality of service for process automation, a big effort has been made for more seamless integration of PASSERELLE, a work-flow engine with dedicated user-friendly interfaces for end users, packaged as JavaBeans in GlobalSCREEN components library. Starting with brief descriptions of software architecture of the PASSERELLE and GlobalSCREEN environments, we will then present the overall system integration design as well as the current status of deployment on SOLEIL beamlines. (authors)

  3. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  4. UNARM (UNattended And Remote Monitoring) overview

    International Nuclear Information System (INIS)

    Sprinkle, J.K. Jr.; Hsue, S.-T.; Klosterbuer, S.F.; Bosler, G.E.; Browne, M.; Menlove, H.O.; Alvar, K.; Halbig, J.K.; Parker, R.F.; Pelowitz, D.G.; Buck, S.E.; Abhold, M.; Reass, P.

    2001-01-01

    Unattended monitoring systems developed at Los Alamos National Laboratory have been installed in facilities for International Atomic Energy Agency (IAEA) use for the last 20 years. These systems allow for more efficient use of inspection resources and more rigorous coverage of IAEA facilities. As of today, the primary sensor types are radiation, video, and binary switches such as seals, but provision to accommodate additional sensor types is an important concept in UNARM. Interfaces to vendor hardware are defined, and being developed as needed. A component of the UNARM approach is the association of time stamps with every piece of data. Additionally, any sensor can trigger any other sensors to record data. For example, radiation signals can be used to trigger camera systems, thereby providing a reliable way to screen out superfluous images. Alternatively, a door switch can trigger the sensors inside a room, indicating whether the activities inside involve nuclear material. A second generation of unattended and remote monitoring (UNARM) systems has been developed at Los Alamos National Laboratory for use in nuclear fuel cycle facilities. Systems have been installed for International Atomic Energy Agency (IAEA) use and evaluation in Japan and Kazakhstan. Excerpts of experience in these locations will be presented. An important sensor type is radiation, which senses an attribute unique to the radioactive material being safeguarded. Several radiation sensor types have been installed successfully to date, they vary from sub-one percent nondestructive assay instruments to go/no-go threshold detectors. The reliability of the radiation sensors is typically less than one failure per sensor per year, sometimes less than 1 failure per sensor per 100 years

  5. A contemporary method for monitoring indoor radon and environmental conditions at a remote test site

    International Nuclear Information System (INIS)

    Renken, K.J.; Coursin, S.

    1996-01-01

    A state-of-the-art method for automatically monitoring indoor radon and environmental conditions at a remote test site is described. A Wisconsin home that exhibited elevated radon levels has been installed with automated PC-data acquisition system (PC-DAS) that includes: a laptop PC, a data acquisition cardcage, a commercial data acquisition software program plus sensors to measure radon gas concentrations, differential pressures, indoor air quality and meteorological conditions. The isolated PC-DAS is connected to a PC in a university laboratory via a modem and a communications software package. Experimental data is monitored and saved by the remote PC in real time and then automatically downloaded to the lab computer at selected intervals. An example of the formatted field results is presented and analysed. This documentation of the set-up, the off-the-shelf computer hardware and software, and the procedures should assist investigations requiring flexible remote long-term radon and environmental monitoring. (Author)

  6. KAMEDIN: a telemedicine system for computer supported cooperative work and remote image analysis in radiology.

    Science.gov (United States)

    Handels, H; Busch, C; Encarnação, J; Hahn, C; Kühn, V; Miehe, J; Pöppl, S I; Rinast, E; Rossmanith, C; Seibert, F; Will, A

    1997-03-01

    The software system KAMEDIN (Kooperatives Arbeiten und MEdizinische Diagnostik auf Innovativen Netzen) is a multimedia telemedicine system for exchange, cooperative diagnostics, and remote analysis of digital medical image data. It provides components for visualisation, processing, and synchronised audio-visual discussion of medical images. Techniques of computer supported cooperative work (CSCW) synchronise user interactions during a teleconference. Visibility of both local and remote cursor on the conference workstations facilitates telepointing and reinforces the conference partner's telepresence. Audio communication during teleconferences is supported by an integrated audio component. Furthermore, brain tissue segmentation with artificial neural networks can be performed on an external supercomputer as a remote image analysis procedure. KAMEDIN is designed as a low cost CSCW tool for ISDN based telecommunication. However it can be used on any TCP/IP supporting network. In a field test, KAMEDIN was installed in 15 clinics and medical departments to validate the systems' usability. The telemedicine system KAMEDIN has been developed, tested, and evaluated within a research project sponsored by German Telekom.

  7. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  8. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  9. Protocol converter for serial communication between digital rectifier controllers and a power plant SCADA system

    Directory of Open Access Journals (Sweden)

    Vukić Vladimir Đ.

    2016-01-01

    Full Text Available The paper describes the protocol converter INT-485-MBRTU, developed for serial communication between the thyristor rectifier (based on the proprietary protocol "INT-CPD-05", according to standard RS-485 and the SCADA system (based on protocol "Modbus RTU", of the same standard in the thermal power plant "Nikola Tesla B1". Elementary data on industrial communication protocols and communication gateways were provided. The basic technical characteristics of the "Omron" programmable logic controller CJ series were described, as well as the developed device INT-485-MBRTU. Protocol converters with two versions of communication software were tested, differing only in one control word, intended for a forced successive change of communication sequences, in opposite to automatic sequence relieve. The device iNT-485-MBRTU, with the program for forced successive change of communication sequences, demonstrated the reliability of data transfer of 100 %, in a sample of approximately 480 messages. For nearly the same sample, the same protocol converter, with a version of the program without any type of message identifiers, transferred less than 60 % of the foreseen data. During multiple sixty-hour tests, the reliability of data transfer of at least 99.9979% was recorded, in 100% of the analysed cases, and for a sample of nearly 96,000 pairs of the send and receive messages. We analysed the results and estimated the additional possibilities for application of the INT-485-MBRTU protocol converter.

  10. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  11. Remote fabrication of nuclear fuel: a secure automated fabrication overview

    International Nuclear Information System (INIS)

    Nyman, D.H.; Benson, E.M.; Yatabe, J.M.; Nagamoto, T.T.

    1981-01-01

    An automated line for the fabrication of breeder reactor fuel pins is being developed. The line will be installed in the Fuels and Materials Examination Facility (FMEF) presently under construction at the Hanford site near Richland, Washington. The application of automation and remote operations to fuel processing technology is needed to meet program requirements of reduced personnel exposure, enhanced safeguards, improved product quality, and increased productivity. Commercially available robots are being integrated into operations such as handling of radioactive material within a process operation. These and other automated equipment and chemistry analyses systems under development are described

  12. Innovations for production optimization in the petroleum industry: conference reports

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    This Insight conference was held to review the methods by which the petroleum industry could optimize production. Presentations from nine guest speakers were included. The issues addressed included the use of computer software for integrated data systems such as SCADA and GIS, the use of remote sensing and real-time systems to monitor well production and reserves capability more effectively, and innovations to minimize finding and development costs and their effect on financial markets. figs

  13. Remote access to mathematical software

    International Nuclear Information System (INIS)

    Dolan, E.; Hovland, P.; More, J.; Norris, B.; Smith, B.

    2001-01-01

    The network-oriented application services paradigm is becoming increasingly common for scientific computing. The popularity of this approach can be attributed to the numerous advantages to both user and developer provided by network-enabled mathematical software. The burden of installing and maintaining complex systems is lifted from the user, while enabling developers to provide frequent updates without disrupting service. Access to software with similar functionality can be unified under the same interface. Remote servers can utilize potentially more powerful computing resources than may be available locally. We discuss some of the application services developed by the Mathematics and Computer Science Division at Argonne National Laboratory, including the Network Enabled Optimization System (NEOS) Server and the Automatic Differentiation of C (ADIC) Server, as well as preliminary work on Web access to the Portable Extensible Toolkit for Scientific Computing (PETSc). We also provide a brief survey of related work

  14. The remote security station (RSS)

    International Nuclear Information System (INIS)

    Pletta, J.B.

    1991-01-01

    This paper reports that, as an outgrowth of research into physical security systems, Sandia is investigating robotic technologies for improving physical security performance and flexibility. Robotic systems have the potential to allow more effective utilization of security personnel, especially in scenarios where they might be exposed to harm. They also can supplement fixed site installations where sensors have failed or where transient assets are present. The Remote Security Station (RSS) program for the defense Nuclear Agency is developing a proof-of-principle robotic system which will be used to evaluate the role, and associated cost, of robotic technologies in exterior physical security systems. The RSS consists of three primary elements: a fixed but quickly moveable tripod with intrusion detection sensors and assessment camera; a mobile robotic platform with a functionally identical security module; and a control console which allows an operator to perform security functions and teleoperate the mobile platform

  15. A Self-Calibrating Remote Control Chemical Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Jessica Croft

    2007-06-01

    The Susie Mine, part of the Upper Tenmile Mining Area, is located in Rimini, MT about 15 miles southwest of Helena, MT. The Upper Tenmile Creek Mining Area is an EPA Superfund site with 70 abandoned hard rock mines and several residential yards prioritized for clean up. Water from the Susie mine flows into Tenmile Creek from which the city of Helena draws part of its water supply. MSE Technology Applications in Butte, Montana was contracted by the EPA to build a treatment system for the Susie mine effluent and demonstrate a system capable of treating mine waste water in remote locations. The Idaho National Lab was contracted to design, build and demonstrate a low maintenance self-calibrating monitoring system that would monitor multiple sample points, allow remote two-way communications with the control software and allow access to the collected data through a web site. The Automated Chemical Analysis Monitoring (ACAM) system was installed in December 2006. This thesis documents the overall design of the hardware, control software and website, the data collected while MSE-TA’s system was operational, the data collected after MSE-TA’s system was shut down and suggested improvements to the existing system.

  16. Remote Sensing

    CERN Document Server

    Khorram, Siamak; Koch, Frank H; van der Wiele, Cynthia F

    2012-01-01

    Remote Sensing provides information on how remote sensing relates to the natural resources inventory, management, and monitoring, as well as environmental concerns. It explains the role of this new technology in current global challenges. "Remote Sensing" will discuss remotely sensed data application payloads and platforms, along with the methodologies involving image processing techniques as applied to remotely sensed data. This title provides information on image classification techniques and image registration, data integration, and data fusion techniques. How this technology applies to natural resources and environmental concerns will also be discussed.

  17. Efficient development of web applications for remote participation using Ruby on Rails

    International Nuclear Information System (INIS)

    Emoto, M.; Yoshida, M.; Iwata, C.; Inagaki, S.; Nagayama, Y.

    2010-01-01

    Large-scale experiments such as ITER require international collaboration, and remote participation plays an important role in carrying out such experiments. Web-based applications are useful tools for scientists participating in experiments remotely using personal computers. Since the participants typically download web-based applications to their computer each time they access the web servers, they do not need to install extra software in order to use these applications. In addition, the application developers do not need to distribute the latest program files each time they are modified, thus reducing maintenance costs for remote participation systems. For these reasons, we have been developing web-based applications for the LHD experiments at NIFS. In a previous study, we showed the benefits of using Ruby on Rails (RoR) to develop web-based applications for analysis code. We thought this approach would also be useful for developing applications for remote participation. Therefore, we have developed several web-based applications using RoR for participating in the LHD experiments. These applications include a data viewer and a scheduler of experiments. The main reason to adopt RoR for this purpose is its efficiency for developing web-based applications. For example, to develop a data viewer, we used an existing program running on an X-Windows System. Using RoR, we could minimize the modifications of the existing programs to add web interfaces. In this paper, we will report a web-based application developed using RoR for the LHD experiment. We will also discuss the benefits of using RoR in developing remote participation tools.

  18. Vulnerability analysis on a VPN for a remote monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Soo; Kim, Jong Soo; Park, Il Jin; Min, Kyung Sik; Choi, Young Myung [KAERI, Taejon (Korea, Republic of)

    2004-08-01

    14 Pressurized Water Reactors(PWR) in Korea use a Remote Monitoring System(RMS), which have been in Korea Since 1998. A memorandum of understanding on remote monitoring, based on enhanced cooperation on PWRs, was signed at the 10th safeguards review meeting in October 2001 between the International Atomic Energy Agency(IAEA) and Ministry Of Science and Technology(MOST). Thereafter, all PWR power plants applied for remote monitoring systems. However, the existing method is high cost (involving expensive telephone costs). So, it was eventually applied to an internet system for remote monitoring. According to the internet-based Virtual Private Network(VPN) applied to remote monitoring, the Korea Atomic Energy Research Institute(KAERI) came to an agreement with the IAEA, using a Member State Support Program(MSSP). Phase I is a lab test. Phase II is to apply it to a target power plant. Phase III is to apply it to all the power plants. This paper reports on the penetration testing of phase I. Phase I involved both domestic testing and international testing. The target of the testing consisted of a Surveillance Digital Integrated system(SDIS) server, IAEA server and TCNC(Technology Center for Nuclear Control) server. In each system, Virtual Private Network(VPN) system hardware was installed. The penetration of the three systems and the three VPNs was tested. The domestic test involved two hacking scenarios: hacking from the outside and hacking from the inside. The international test involved one scenario from the outside. The results of tests demonstrated that the VPN hardware provided a good defense against hacking. We verified that there was no invasion of the system (SDIS server and VPN; TCNC server and VPN; and IAEA server and VPN) via penetration testing.

  19. Vulnerability analysis on a VPN for a remote monitoring system

    International Nuclear Information System (INIS)

    Kim, Jung Soo; Kim, Jong Soo; Park, Il Jin; Min, Kyung Sik; Choi, Young Myung

    2004-01-01

    14 Pressurized Water Reactors(PWR) in Korea use a Remote Monitoring System(RMS), which have been in Korea Since 1998. A memorandum of understanding on remote monitoring, based on enhanced cooperation on PWRs, was signed at the 10th safeguards review meeting in October 2001 between the International Atomic Energy Agency(IAEA) and Ministry Of Science and Technology(MOST). Thereafter, all PWR power plants applied for remote monitoring systems. However, the existing method is high cost (involving expensive telephone costs). So, it was eventually applied to an internet system for remote monitoring. According to the internet-based Virtual Private Network(VPN) applied to remote monitoring, the Korea Atomic Energy Research Institute(KAERI) came to an agreement with the IAEA, using a Member State Support Program(MSSP). Phase I is a lab test. Phase II is to apply it to a target power plant. Phase III is to apply it to all the power plants. This paper reports on the penetration testing of phase I. Phase I involved both domestic testing and international testing. The target of the testing consisted of a Surveillance Digital Integrated system(SDIS) server, IAEA server and TCNC(Technology Center for Nuclear Control) server. In each system, Virtual Private Network(VPN) system hardware was installed. The penetration of the three systems and the three VPNs was tested. The domestic test involved two hacking scenarios: hacking from the outside and hacking from the inside. The international test involved one scenario from the outside. The results of tests demonstrated that the VPN hardware provided a good defense against hacking. We verified that there was no invasion of the system (SDIS server and VPN; TCNC server and VPN; and IAEA server and VPN) via penetration testing

  20. Investigating Near Space Interaction Regions: Developing a Remote Observatory

    Science.gov (United States)

    Gallant, M.; Mierkiewicz, E. J.; Oliversen, R. J.; Jaehnig, K.; Percival, J.; Harlander, J.; Englert, C. R.; Kallio, R.; Roesler, F. L.; Nossal, S. M.; Gardner, D.; Rosborough, S.

    2016-12-01

    The Investigating Near Space Interaction Regions (INSpIRe) effort will (1) establish an adaptable research station capable of contributing to terrestrial and planetary aeronomy; (2) integrate two state-of-the-art second generation Fabry-Perot (FP) and Spatial Heteorodyne Spectrometers (SHS) into a remotely operable configuration; (3) deploy this instrumentation to a clear-air site, establishing a stable, well-calibrated observatory; (4) embark on a series of observations designed to contribute to three major areas of geocoronal research: geocoronal physics, structure/coupling, and variability. This poster describes the development of the INSpIRe remote observatory. Based at Embry-Riddle Aeronautical University (ERAU), initiative INSpIRe provides a platform to encourage the next generation of researchers to apply knowledge gained in the classroom to real-world science and engineering. Students at ERAU contribute to the INSpIRe effort's hardware and software needs. Mechanical/optical systems are in design to bring light to any of four instruments. Control software is in development to allow remote users to control everything from dome and optical system operations to calibration and data collection. In April 2016, we also installed and tested our first science instrument in the INSpIRe trailer, the Redline DASH Demonstration Instrument (REDDI). REDDI uses Doppler Asymmetric Spatial Heterodyne (DASH) spectroscopy, and its deployment as part of INSpIRe is a collaborative research effort between the Naval Research Lab, St Cloud State University, and ERAU. Similar to a stepped Michelson device, REDDI measures oxygen (630.0 nm) winds from the thermosphere. REDDI is currently mounted in a temporary location under INSpIRe's main siderostat until its entrance optical system can be modified. First light tests produced good signal-to-noise fringes in ten minute integrations, indicating that we will soon be able to measure thermospheric winds from our Daytona Beach testing site

  1. Cost estimation of a standalone photovoltaic power system in remote areas of Sarawak, Malaysia

    International Nuclear Information System (INIS)

    Jakhrani, A.Q.; Othman, A.K.; Rigit, A.R.H.; Samo, S.R.

    2012-01-01

    This paper aims to estimate the anticipated costs incurred from a standalone solar photovoltaic power system for the supply of electricity to the rural community in Sarawak, Malaysia. The life cycle cost analysis with net present value technique was employed for the evaluation of cost system. It was found that purchasing of solar photovoltaic components and the system installation cost will contribute 63% of the total investment and future anticipated costs will add to the remaining. Recurring cost will make 25% and components replacements 75% of future anticipated costs. It was discovered that the power generated from the solar photovoltaic system would be 38 times more expensive than electricity produced from the conventional sources. However, its installation in remote areas could be favourable where the grid-connected power supply is not accessible. (author)

  2. Cost-benefit analysis of remote hybrid wind-diesel power stations: Case study Aegean Sea islands

    International Nuclear Information System (INIS)

    Kaldellis, J.K.; Kavadias, K.A.

    2007-01-01

    More than one third of world population has no direct access to interconnected electrical networks. Hence, the electrification solution usually considered is based on expensive, though often unreliable, stand-alone systems, mainly small diesel-electric generators. Hybrid wind-diesel power systems are among the most interesting and environmental friendly technological alternatives for the electrification of remote consumers, presenting also increased reliability. More precisely, a hybrid wind-diesel installation, based on an appropriate combination of a small diesel-electric generator and a micro-wind converter, offsets the significant capital cost of the wind turbine and the high operational cost of the diesel-electric generator. In this context, the present study concentrates on a detailed energy production cost analysis in order to estimate the optimum configuration of a wind-diesel-battery stand-alone system used to guarantee the energy autonomy of a typical remote consumer. Accordingly, the influence of the governing parameters-such as wind potential, capital cost, oil price, battery price and first installation cost-on the corresponding electricity production cost is investigated using the developed model. Taking into account the results obtained, hybrid wind-diesel systems may be the most cost-effective electrification solution for numerous isolated consumers located in suitable (average wind speed higher than 6.0 m/s) wind potential regions

  3. Hacking of water and electric utilities; Waterzuiveringen zijn gemakkelijk te hacken

    Energy Technology Data Exchange (ETDEWEB)

    Van de Kelft, D. [Waterschapsbedrijf Limburg, Roermond (Netherlands)

    2004-03-01

    Attention is paid to the fact that control systems (Supervisory Control and Data Acquisition Systems or SCADA) of electric power plants and water purification installations are easy targets for hackers and computer viruses. [Dutch] De besturingssystemen van energiecentrales en waterzuiveringsinstallaties worden steeds vaker gekoppeld aan internet of andere netwerken in het bedrijf. Dat maakt de systemen een gemakkelijk doelwit voor hackers en virussen. Er wordt gepleit voor een integrale aanpak van de beveiliging.

  4. Novel apparatus and methods for performing remotely controlled particle-solid interaction experiments at CERN

    Science.gov (United States)

    Krause, H. F.; Deveney, E. F.; Jones, N. L.; Vane, C. R.; Datz, S.; Knudsen, H.; Grafström, P.; Schuch, R.

    1997-04-01

    Recent atomic physics studies involving ultrarelativistic Pb ions required solid target positioners, scintillators, and a sophisticated data acquisition and control system placed in a remote location at the CERN Super Proton Synchrotron near Geneva, Switzerland. The apparatus, installed in a high-radiation zone underground, had to (i) function for months, (ii) automatically respond to failures such as power outages and particle-induced computer upsets, and (iii) communicate with the outside world via a telephone line. The heart of the apparatus developed was an Apple Macintosh-based CAMAC system that answered the telephone and interpreted and executed remote control commands that (i) sensed and set targets, (ii) controlled voltages and discriminator levels for scintillators, (iii) modified data acquisition hardware logic, (iv) reported control information, and (v) automatically synchronized data acquisition to the CERN spill cycle via a modem signal and transmitted experimental data to a remote computer. No problems were experienced using intercontinental telephone connections at 1200 baud. Our successful "virtual laboratory" approach that uses off-the-shelf electronics is generally adaptable to more conventional bench-type experiments.

  5. Fuel Saving on Diesel Genset using PV/Battery Spike Cutting in Remote Area Microgrid

    Directory of Open Access Journals (Sweden)

    Dwi Atmaja Tinton

    2018-01-01

    Full Text Available Diesel Generator set was found to be a favorite power generator in a remote area. In this area, diesel genset usually consumes a significant amount of diesel fuel with higher fuel price than an urban area. Diesel Generator capacity conventionally prepared twice bigger or more than the existing load to prevent any load spike from designated equipment. This work implements an Energy Management System to cut the spike with the support from battery storage unit and photovoltaic module. Once the Energy Management System cut the load spike using battery/photovoltaics, Diesel Generator loads no longer need to be irrelevantly bigger than the existing load. The current experiment in the remote island at Raja Ampat archipelago indicates that the using of 80 kVA Diesel Generator can be reduced to 42 kVA Diesel Generator. This Diesel Generator replacement induces fuel consumption up to 50 %. With this designed work, a smart microgrid with PV-Battery-Diesel can be installed in a designated remote area with lower fuel consumption.

  6. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  7. RISA: Remote Interface for Science Analysis

    Science.gov (United States)

    Gabriel, C.; Ibarra, A.; de La Calle, I.; Salgado, J.; Osuna, P.; Tapiador, D.

    2008-08-01

    The Scientific Analysis System (SAS) is the package for interactive and pipeline data reduction of all XMM-Newton data. Freely distributed by ESA to run under many different operating systems, the SAS has been used by almost every one of the 1600 refereed scientific publications obtained so far from the mission. We are developing RISA, the Remote Interface for Science Analysis, which makes it possible to run SAS through fully configurable web service workflows, enabling observers to access and analyse data making use of all of the existing SAS functionalities, without any installation/download of software/data. The workflows run primarily but not exclusively on the ESAC Grid, which offers scalable processing resources, directly connected to the XMM-Newton Science Archive. A first project internal version of RISA was issued in May 2007, a public release is expected already within this year.

  8. Programmable logic controller optical fibre sensor interface module

    Science.gov (United States)

    Allwood, Gary; Wild, Graham; Hinckley, Steven

    2011-12-01

    Most automated industrial processes use Distributed Control Systems (DCSs) or Programmable Logic Controllers (PLCs) for automated control. PLCs tend to be more common as they have much of the functionality of DCSs, although they are generally cheaper to install and maintain. PLCs in conjunction with a human machine interface form the basis of Supervisory Control And Data Acquisition (SCADA) systems, combined with communication infrastructure and Remote Terminal Units (RTUs). RTU's basically convert different sensor measurands in to digital data that is sent back to the PLC or supervisory system. Optical fibre sensors are becoming more common in industrial processes because of their many advantageous properties. Being small, lightweight, highly sensitive, and immune to electromagnetic interference, means they are an ideal solution for a variety of diverse sensing applications. Here, we have developed a PLC Optical Fibre Sensor Interface Module (OFSIM), in which an optical fibre is connected directly to the OFSIM located next to the PLC. The embedded fibre Bragg grating sensors, are highly sensitive and can detect a number of different measurands such as temperature, pressure and strain without the need for a power supply.

  9. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  10. Reactor units for power supply of remote and inaccessible regions: Selection issue

    Directory of Open Access Journals (Sweden)

    Melnikov N.N.

    2015-06-01

    Full Text Available The paper briefly presents the problem aspects on power supply for the remote and inaccessible regions of Russia. Reactor units of different type and installed electric capacity have been considered in relation to the issue of power supply during mineral deposit development in the Chukotka autonomous region, Yakutia and Irkutsk region. Some preliminary assessment of the possible options for use of small nuclear power plants in various sectors of energy consumption have been carried out based on the analysis of different scenarios for economic development of the regions considered

  11. Crane system with remote actuation mechanism for use in argon compartment in ACPF hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Kwang, E-mail: leejk@kaeri.re.kr; Park, Byung-Suk; Yu, Seung-Nam; Kim, Kiho; Cho, Il-je

    2016-10-15

    Highlights: • Novel crane system with a remote actuation mechanism for feasible maintenance under limited space conditions is proposed. • Linear drive systems are implemented for accurate positioning. • Modular design concepts for easy maintenance are introduced. • The motion controller and the off-the-shelf camera controller are integrated to provide more efficient operation. - Abstract: The Advanced spent fuel Conditioning Process Facility (ACPF) at the Korea Atomic Energy Research Institute (KAERI) has recently been successfully renovated. One of the highlights of this renovation project was the installation of a small argon compartment within the atmospheric hot cell of the facility. Even though a crane system was considered necessary for the remote handling of the processing equipment inside the argon compartment, no suitable commercial cranes were available. This was because a limited amount of space had been reserved for the installation of the crane. Moreover, a master-slave manipulator (MSM), the only available means of maintenance of the crane, was unable to reach it in the limited workspace. To address the difficulties in the design of this crane, in this study, a remote actuation mechanism is devised where the mechanical and electrical parts of the crane system are separated, positioned far away from each other, and connected through power transmission shafts. This approach has two main advantages. First, the electrical parts can be placed inside the workspace of the MSM, hence allowing for remote maintenance. Second, the space occupied by the electrical parts and their cables, which are separate from the crane in the proposed design, can be considered and exploited in designing the mechanical parts of the crane. This enables the construction of a short, special crane in order to maximize the workspace. Furthermore, the mechanical parts for the MSM located outside the workspace are designed to possess a high safety margin to ensure durability

  12. Robotics for Long-Term Monitoring

    International Nuclear Information System (INIS)

    Shahin, Sarkis; Duran, Celso

    2002-01-01

    While long-term monitoring and stewardship means many things to many people, DOE has defined it as The physical controls, institutions, information, and other mechanisms needed to ensure protection of people and the environment at sites where DOE has completed or plans to complete cleanup (e.g., landfill closures, remedial actions, and facility stabilization). Across the United States, there are thousands of contaminated sites with multiple contaminants released from multiple sources where contaminants have transported and commingled. The U.S. government and U.S. industry are responsible for most of the contamination and are landowners of many of these contaminated properties. These sites must be surveyed periodically for various criteria including structural deterioration, water intrusion, integrity of storage containers, atmospheric conditions, and hazardous substance release. The surveys, however, are intrusive, time-consuming, and expensive and expose survey personnel to radioactive contamination. In long-term monitoring, there's a need for an automated system that will gather and report data from sensors without costly human labor. In most cases, a SCADA (Supervisory Control and Data Acquisition) unit is used to collect and report data from a remote location. A SCADA unit consists of an embedded computer with data acquisition capabilities. The unit can be configured with various sensors placed in different areas of the site to be monitored. A system of this type is static, i.e., the sensors, once placed, cannot be moved to other locations within the site. For those applications where the number of sampling locations would require too many sensors, or where exact location of future problems is unknown, a mobile sensing platform is an ideal solution. In many facilities that undergo regular inspections, the number of video cameras and air monitors required to eliminate the need for human inspections is very large and far too costly. HCET's remote harsh

  13. Inexpensive remote video surveillance system with microcomputer and solar cells

    International Nuclear Information System (INIS)

    Guevara Betancourt, Edder

    2013-01-01

    A low-cost prototype is developed with a RPI plate for remote video surveillance. Additionally, the theoretical basis to provide energy independence have developed through solar cells and a battery bank. Some existing commercial monitoring systems are studied and analyzed, components such as: cameras, communication devices (WiFi and 3G), free software packages for video surveillance, control mechanisms and theory remote photovoltaic systems. A number of steps are developed to implement the module and install, configure and test each of the elements of hardware and software that make up the module, exploring the feasibility of providing intelligence to the system using the software chosen. Events that have been generated by motion detection have been simple, intuitive way to view, archive and extract. The implementation of the module by a microcomputer video surveillance and motion detection software (Zoneminder) has been an option for a lot of potential; as the platform for monitoring and recording data has provided all the tools to make a robust and secure surveillance. (author) [es

  14. JACoW Virtual control commissioning for a large critical ventilation system: The CMS cavern use case

    CERN Document Server

    Booth, William; Bradu, Benjamin; Sourisseau, Samuel

    2018-01-01

    The current cavern ventilation control system of the CMS experiment at CERN is based on components which are already obsolete: the SCADA system, or close to the end of life: the PLCs. The control system is going to be upgraded during the LHC Long Shutdown 2 (2019-2020) and will be based on the CERN industrial control standard: UNICOS employing WinCC OA as SCADA and Schneider PLCs. Due to the critical nature of the CMS ventilation installation and the short allowed downtime, the approach was to design an environment based on the virtual commissioning of the new control. This solution uses a first principles model of the ventilation system to simulate the real process. The model was developed with the modelling and simulation software EcosimPro. In addition, the current control application of the cavern ventilation will also be re-engineered as it is not completely satisfactory in some transients where many sequences are performed manually and some pressure fluctuations observed could potentially cause issues t...

  15. Radiation exposure control by estimation of multiplication factors for online remote radiation monitoring systems at Vitrification Plant

    International Nuclear Information System (INIS)

    Deokar, Umesh V.; Kukarni, V.V.; Khot, A.R.; Mathew, P.; Kamlesh; Purohit, R.G.; Sarkar, P.K.

    2011-01-01

    Vitrification Plant is commissioned for vitrification of high-level liquid waste generated in Nuclear Fuel Cycle operations by using Joule Heated Ceramic Melter first time in India. Exposure control is a major concern in operating plant. Therefore, in addition to installed monitors, we have developed online remote radiation monitoring system to minimize number of entries in amber areas and to reduce the exposure to the surveyor and operator. This also helped in volume reduction of secondary waste. The reliability and accuracy of the online monitoring system is confirmed with actual measurements and by theoretical shielding calculations. The multiplication factors were estimated for remote online monitoring of Melter off Gas (MOG) filter, Hood filter, three exhaust filter banks, and overpack monitoring. This paper summarizes how the online remote monitoring system had helped in saving of 128.52 Person-mSv collective dose (14.28% of budgeted dose) and also there was 2.6 m 3 reduction in generation of Cat-I waste. (author)

  16. Design and installation of a multimode microscopy system

    Science.gov (United States)

    Helm, Johannes P.; Haug, Finn-Mogens S.; Storm, Johan F.; Ottersen, Ole-Petter

    2001-04-01

    We describe design and installation of a multi-mode microscopy core facility in an environment of varied research activity in life-sciences. The experimentators can select any combination of a) microscopes (upright, upright fixed-stage, inverted), b) microscopy modes (widefield, DIC, IRDIC, widefield epifluorescence, transmission LSM, reflection and fluorescence CLSM, MPLSM), c) imaging techniques (direct observation, video observation, photography, quantitative camera-recording, flying spot scanning), d) auxiliary systems (equipment for live specimen imaging, electrophysiology, time-coordinated laser-scanning and electrophysiology, patch-clamp). The equipment is installed on one large vibration-isolating optical table (3m X 1.5m X 0.3m). Electronics, auxiliary equipment, and a fiber-coupled, remotely controlled Ar+-Kr+ laser are mounted in a rack system fixed to the ceiling. The design of the shelves allows the head of the CSLM to be moved to any of the microscopes without increasing critical cable lengths. At the same time easy access to all the units is preserved. The beam of a Titanium-Sapphire laser, controlled by means of an EOM and a prism GVD, is coupled directly to the microscopes. Three mirrors mounted on a single precision translation table are integrated into the beam steering system so that the beam can easily be redirected to any of the microscopes. All the available instruments can be operated by the educated and trained user. The system is popular among researchers in neuroanatomy, embryology, cell biology, molecular biology - including the study of protein interactions, e.g. by means of FRET, and electrophysiology. Its colocalization with an EM facility promises to provide considerable synergy effects.

  17. Automation and remote handling activities in BARC: an overview

    International Nuclear Information System (INIS)

    Badodkar, D.N.

    2016-01-01

    Division of Remote Handling and Robotics, BARC has been working on design and development of various application specific remote handling and automation systems for nuclear front-end and back-end fuel cycle technologies. Division is also engaged in preservice and in-service inspection of coolant channels for Pressurized Heavy Water Reactors in India. Design and development of Reactor Control Mechanisms for Nuclear Research and Power Reactors (PHWRs and Compact LWRs) is another important activity carried out in this division. Robotic systems for Indoor and Outdoor surveillance in and around nuclear installations have also been developed. A line scan camera based system has been developed for measuring individual PHWR fuel pellet lengths as well as stack length. An industrial robot is used for autonomous exchange of pellets to achieve desired stack length. The system can be extended for active fuel pellets also. An automation system has been conceptualized for remote handling and transfer of spent fuel bundles from storage pool directly to the chopper unit of reprocessing plant. In case of Advanced Heavy Water Reactor which uses mixed oxides of (Th-Pu) and (Th-"2"3"3U ) as fuel, automation system for front-end fuel cycle has been designed, which includes Powder processing and pressing; Pellet handling and inspection; Pin handling and inspection; and Cluster assembly and dis-assembly in shielded facilities. System demonstration through fullscale mock-up facility is nearing completion. Above talk is presented on behalf of all the officers and staff of DRHR. The talk is mainly focused on development of an automated fuel fabrication facility for mixed oxides of (Th- Pu)/(Th-"2"3"3U ) fuel pins. An overview of divisional ongoing activities in the field of remote handling and automation are also covered. (author)

  18. Development and application of remote video monitoring system for combine harvester based on embedded Linux

    Science.gov (United States)

    Chen, Jin; Wang, Yifan; Wang, Xuelei; Wang, Yuehong; Hu, Rui

    2017-01-01

    Combine harvester usually works in sparsely populated areas with harsh environment. In order to achieve the remote real-time video monitoring of the working state of combine harvester. A remote video monitoring system based on ARM11 and embedded Linux is developed. The system uses USB camera for capturing working state video data of the main parts of combine harvester, including the granary, threshing drum, cab and cut table. Using JPEG image compression standard to compress video data then transferring monitoring screen to remote monitoring center over the network for long-range monitoring and management. At the beginning of this paper it describes the necessity of the design of the system. Then it introduces realization methods of hardware and software briefly. And then it describes detailedly the configuration and compilation of embedded Linux operating system and the compiling and transplanting of video server program are elaborated. At the end of the paper, we carried out equipment installation and commissioning on combine harvester and then tested the system and showed the test results. In the experiment testing, the remote video monitoring system for combine harvester can achieve 30fps with the resolution of 800x600, and the response delay in the public network is about 40ms.

  19. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  20. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  1. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  2. Development of equipments for remote dismantling of joule heated ceramic melter

    International Nuclear Information System (INIS)

    Badgujar, Kiran T.; Usarkar, Sachin G.; Kumar, Binu; Nair, K.N.S.

    2011-01-01

    Joule Heated Ceramic Melter (JHCM) technology has been adopted for industrial scale vitrification of high level liquid waste (HLLW) at Tarapur and Kalpakkam. The melter installed at Advanced Vitrification System (AVS), Tarapur has immobilized 175 m 3 of HLLW in 113 canisters containing 11533Kg of Vitrified Waste Product (VWP). The melter has been in operation for 3 years before shutdown. It is intended to demonstrate the complete procedure of dismantling of Joule Melter in 1:1 scale prior to going in for actual dismantling in the hot cell. The Melter consists of an assembly of Inconel/SS pipes and plates, fuse cast refractories, thermal insulations of various types inside a SS casing and possibly some glass which is left over in the melter. Dismantling of melter involves remote cutting of the outer casing, pipe connections, electrical connections and removal, sizing and packing of internals in a sequential manner to minimise generation of secondary waste. The challenge involves development of remotely operated multi-degrees of freedom fixtures, modification and performance testing of standard industrial cutting and breaking tools and adapting them for remote operations. The work also involves development of equipments for collection of waste generated during the dismantling operation and packaging thus in special packages. Remotely actuated fixtures have been developed for remote top plate and side electrodes cutting. Remotely operated grab has been developed for handling of loose material and grippers have been developed for handling of refractory blocks. Industrial vacuum suction device has been modified into split units to enable for reducing the spread of powder material, while dismantling in progress. The performance test of developed fixtures, equipments, cutting and breaking tools have been carried on 1:1 scale melter model. Various parameters like cutting speed, cutting tool performance, generation of waste volume has been measured and analysed for

  3. Radiation exposure control by estimation of multiplication factors for online remote radiation monitoring systems at vitrification plant

    International Nuclear Information System (INIS)

    Deokar, U.V.; Kulkarni, V.V.; Khot, A.R.; Mathew, P.; Kamlesh; Purohit, R.G.; Sarkar, P.K.

    2012-01-01

    Vitrification Plant is commissioned for vitrification of high level liquid waste (HLW) generated in nuclear fuel cycle operations by using Joule Heated Ceramic Melter first time in India. Exposure control is a major concern in operating plant. Therefore in addition to installed monitors, we have developed online remote radiation monitoring system to minimize number of entries in amber areas and to reduce the exposure to the surveyor and operator. This also helped in volume reduction of secondary waste. The reliability and accuracy of the online monitoring system is confirmed with actual measurements and by theoretical shielding calculations. The multiplication factors were estimated for remote on line monitoring of Melter Off Gas (MOG) filter, Hood filter, three exhaust filter banks, and over-pack monitoring. This paper summarizes - how the online remote monitoring system helped in saving of 128.52 person-mSv collective dose (14.28% of budgeted dose). The system also helped in the reduction of 2.6 m 3 of Cat-I waste. Our online remote monitoring system has helped the plant management to plan in advance for replacement of these filters, which resulted in considerable saving in collective dose and secondary waste

  4. Thermal infrared spectra of surface rocks. Comparison of in the laboratory, in situ, and remote sensing data; Chihyo ganseki no netsusekigaiiki bunko tokusei. Chijo sokutei data to remote sensing data no hikaku

    Energy Technology Data Exchange (ETDEWEB)

    Ninomiya, Y; Matsunaga, T [Geological Survey of Japan, Tsukuba (Japan)

    1996-10-01

    An ASTER (advanced spaceborne thermal emission and reflection radiometer) is one of the image sensors. It is to be installed in an earth survey polar orbit platform satellite, EOS-AM1, which is to be launched in 1998, and it is going to start its operation. Data observed by the thermal infrared remote sensing of ASTER include the spectral emissivity, and the spectral emission reflectivity which is expressed by the function of temperature. It is required to overcome technical problems how to extract the spectral emissivity from the observed data. The spectral emissivity extracted from the remote sensing data by the MMD method, measured for samples collected in Cuprite area, Nevada, and/or measured at sampled points were compared to each other and discussed. The hemisphere spectral reflectivity, which is indirect spectral emissivity, agreed well with the direct spectral emissivity. Data suggesting the establishment of Kirchhoff`s law were obtained even for the weathered samples. The spectral emissivity derived from the remote sensing data by the MMD method was in harmony with the spectral characteristics measured strictly on the ground. 14 refs., 3 figs.

  5. Remotely operated organic liquid waste incinerator for the fuels and materials examination facility

    International Nuclear Information System (INIS)

    Sales, W.L.; Barker, R.E.; Hershey, R.B.

    1980-01-01

    The search for a practical method for the disposal of small quantities of oraganic liquid waste, a waste product of metallographic sample preparation at the Fuels and Materials Examination Facility has led to the design of an incinerator/off-gas system to burn organic liquid wastes and selected organic solids. The incinerator is to be installed in a shielded inert-atmosphere cell, and will be remotely operated and maintained. The off-gas system is a wet-scrubber and filter system designed to release particulate-free off-gas to the FMEF Building Exhaust System

  6. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  7. Oilpatch Infobahn: SCADANet keeps gas marketers up to speed

    Energy Technology Data Exchange (ETDEWEB)

    Leschart, M.

    2002-08-01

    A new SCADAnet product that keeps tabs on the performance of natural gas wells in real time is described. The system consists of two subgroups. In one subgroup the system acts as a SCADA host for groups of wells, via the field connection, that communicate directly to the SCADAnet server through a dedicated remote terminal. In the second subgroup an augmented PC at the plant concentrates data from a number of SCADA hosts and plant-distributed control systems. One of the system's key selling points is the ability to provide real-time data to marketers, who up-to-now had to rely on old (up to a month) figures when estimating the amount of sales gas a producing company has available. The software not only allows incorporation of field data directly into its production accounting system, but also has an alarm feature notifying the operator or marketer of a production problem at a specific well via e-mail, pager or voice mail. Since the developers of the system had remote plant sites in mind when developing the system, SCADAnet contains few display-stalling, high resolution graphic images. It is designed for 19.2 bytes/sec modem in mind, so that even with a relatively slow Internet connection producers can access real-time production data and analyze the information with the software's trending features.

  8. Oilpatch Infobahn: SCADANet keeps gas marketers up to speed

    International Nuclear Information System (INIS)

    Leschart, M.

    2002-01-01

    A new SCADAnet product that keeps tabs on the performance of natural gas wells in real time is described. The system consists of two subgroups. In one subgroup the system acts as a SCADA host for groups of wells, via the field connection, that communicate directly to the SCADAnet server through a dedicated remote terminal. In the second subgroup an augmented PC at the plant concentrates data from a number of SCADA hosts and plant-distributed control systems. One of the system's key selling points is the ability to provide real-time data to marketers, who up-to-now had to rely on old (up to a month) figures when estimating the amount of sales gas a producing company has available. The software not only allows incorporation of field data directly into its production accounting system, but also has an alarm feature notifying the operator or marketer of a production problem at a specific well via e-mail, pager or voice mail. Since the developers of the system had remote plant sites in mind when developing the system, SCADAnet contains few display-stalling, high resolution graphic images. It is designed for 19.2 bytes/sec modem in mind, so that even with a relatively slow Internet connection producers can access real-time production data and analyze the information with the software's trending features

  9. Installing the earth station of Ka-band satellite frequency in Malaysia: conceptual framework for site decision

    Science.gov (United States)

    Mahmud, M. R.; Reba, M. N. M.; Jaw, S. W.; Arsyad, A.; Ibrahim, M. A. M.

    2017-05-01

    This paper developed a conceptual framework in determining the suitable location in installing the earth station for Ka-band satellite communication in Malaysia. This current evolution of high throughput satellites experienced major challenge due to Malaysian climate. Because Ka-band frequency is highly attenuated by the rainfall; it is an enormous challenge to define the most appropriate site for the static communication. Site diversity, a measure to anticipate this conflict by choosing less attenuated region and geographically change the transmission strategy on season basis require accurate spatio-temporal information on the geographical, environmental and hydro-climatology at local scale. Prior to that request, this study developed a conceptual framework to cater the needs. By using the digital spatial data, acquired from site measurement and remote sensing, the proposed framework applied a multiple criteria analysis to perform the tasks of site selection. With the advancement of high resolution remotely sensed data, site determination can be conducted as in Malaysia; accommodating a new, fast, and effective satellite communication. The output of this study is one of the pioneer contributions to create a high tech-society.

  10. Remote Research

    CERN Document Server

    Tulathimutte, Tony

    2011-01-01

    Remote studies allow you to recruit subjects quickly, cheaply, and immediately, and give you the opportunity to observe users as they behave naturally in their own environment. In Remote Research, Nate Bolt and Tony Tulathimutte teach you how to design and conduct remote research studies, top to bottom, with little more than a phone and a laptop.

  11. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  12. Implementation of a Digital Mock-up for Remote Hot cell Operations

    International Nuclear Information System (INIS)

    Park, Hee Seong; Park, Byung Suk; Kim, Sung Hyun; Kim, Ki Ho; Kim, Ho Dong

    2010-01-01

    A remote manipulation environment that a human operator has to observe is the inner side of a hotcell through a lead grass window which has many obstacles due to many existing 'blind-spots' where are several cameras installed. The lack of visual information when operating in a cluttered environment makes manoeuvering a manipulator very difficult and when this situation is exacerbated by strict time limits for a task completion, then a manipulator and environmental collisions and resultant damage can occur. To cope with these problems, there has been efforts to develop a virtual simulator to validate control programs visually and to establish maintainability-engineering tools that automate generation assembly/disassembly procedures by using Computer Aided Design(CAD) visualization systems with human figure models to virtual reality systems where engineers can interact with the system using virtual input devices. This article introduces a system that can simulate a deployment analysis on a digital mock-up effectively and proposes a scheme to enable an operator to improve a remote manipulation by using a haptic device

  13. Remote telerobotic replacement for master-slave manipulator

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Iverson, D.C.; LaValle, D.R.

    1997-01-01

    A remotely replaceable telerobotic manipulator (TRM) has been developed and deployed at the Defense Waste Processing Facility (DWPF) in support of its radioactive operation. The TRM replaces a Master-Slave Manipulator (MSM). The TRM is in use for both routine and recovery operations for the radioactive waste vitrification melter, the primary production device within the DWPF. The arm was designed for deployment and operation using an existing MSM penetration. This replacement of an existing MSM with a high power robotic device demonstrates the capability to perform similar replacement in other operating facilities. The MSM's were originally deployed in the DWPF to perform routine light capacity tasks. During the testing phase of the DWPF, prior to its radioactive startup in 5/96, the need to remove glass deposits that can form at the melter discharge during filling of glass containment canisters was identified. The combination of high radiation and contamination in the DWPF melter cell during radioactive operation eliminated personnel entry as a recovery option. Therefore remote cleaning methods had to be devised. The MSM's had neither the reach nor the strength required for this task. It became apparent that a robust manipulator arm would be required for recovery from these potential melter discharge pluggage events. The existing wall penetrations, used for the MSM's, could not be altered for seismic and radiological reasons. The new manipulator was required to be of considerable reach, due to existing physical layout, and strength, due to the glass removal requirement. Additionally, the device would have to compatible with high radiation and remote crane installation. The physical size of the manipulator and the weight of components must be consistent with the existing facilities. It was recognized early-on that a manipulator of sufficient strength to recover from a pluggage event would require robotic functions to constrain undesirable motions

  14. Multibeam Mapping of Remote Fjords in Southeast-Greenland

    Science.gov (United States)

    Weinrebe, W.; Kjaer, K. H.; Kjeldsen, K. K.; Bjork, A. A.

    2015-12-01

    The fjords of Southeast-Greenland are among the most remote areas of the Northern Hemisphere. Access to this area is hampered by a broad belt of sea ice floating along the East-Greenland coast from North to South. Consequently, the majority of those fjords have never been surveyed in detail until now. During an expedition by the Center of GeoGenetics of the University of Copenhagen in summer of 2014 we were able to map the Skjoldungen Fjord system with multibeam bathymetry. The topsail schooner ACTIV, built 1951 as a cargo ship to supply remote settlements in Greenland was chosen for the expedition. Though a vintage vessel, the ACTIV was well suited to cross the belt of sea ice and to cruise the ice covered fjords. A portable ELAC-Seabeam 1050 multibeam system was temporarily installed on the vessel. The two transducer of the system were mounted at the lower end of a 6 m long pole attached outboard at port side to the hull of the vessel. Though the installation was quite demanding without any winches or cranes, the construction was sufficiently stable and easy to manage throughout the entire cruise. Nearly the entire fjord system, leaving only a small gap of 5 km at the innermost part and small stripes close to the shorelines could be surveyed during the cruise. For the first time, a comprehensive map of Skjoldungen Fjord is now available. The map displays water depths from close to zero up to 800 m, the deepest part along a stretch of about 10 km in the Southwest. The bathymetry of the northern fjord is remarkably different from the southern fjord: the southern fjord features an outer deep part showing water depths between 500 m and 800 m and a shallow inner part with depths less than 300 m and a prominent sill in between. The northern fjord shows a more gradual increase of water depths from 200 m in the inner part to 600 m at the entrance.

  15. Remote Sensing of Surficial Process Responses to Extreme Meteorological Events

    Science.gov (United States)

    Brakenridge, G. Robert

    1997-01-01

    Changes in the frequency and magnitude of extreme meteorological events are associated with changing environmental means. Such events are important in human affairs, and can also be investigated by orbital remote sensing. During the course of this project, we applied ERS-1, ERS-2, Radarsat, and an airborne sensor (AIRSAR-TOPSAR) to measure flood extents, flood water surface profiles, and flood depths. We established a World Wide Web site (the Dartmouth Flood Observatory) for publishing remote sensing-based maps of contemporary floods worldwide; this is also an online "active archive" that presently constitutes the only global compilation of extreme flood events. We prepared an article for EOS concerning SAR imaging of the Mississippi Valley flood; an article for the International Journal of Remote Sensing on measurement of a river flood wave using ERS-2, began work on an article (since completed and published) on the Flood Observatory for a Geoscience Information Society Proceedings volume, and presented lectures at several Geol. Soc. of America Natl. Meetings, an Assoc. of Amer. Geographers Natl. Meeting, and a Binghamton Geomorphology Symposium (all on SAR remote sensing of the Mississippi Valley flood). We expanded in-house modeling capabilities by installing the latest version of the Army Corps of Engineers RMA two-dimensional hydraulics software and BYU Engineering Graphics Lab's Surface Water Modeling System (finite elements based pre- and post-processors for RMA work) and also added watershed modeling software. We are presently comparing the results of the 2-d flow models with SAR image data. The grant also supported several important upgrades of pc-based remote sensing infrastructure at Dartmouth. During work on this grant, we collaborated with several workers at the U.S. Army Corps of Engineers, Remote Sensing/GIS laboratory (for flood inundation mapping and modeling; particularly of the Illinois River using the AIRSAR/TOPSAR/ERS-2 combined data), with Dr

  16. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  17. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  18. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  19. Overview of progress on the European DEMO remote maintenance strategy

    Energy Technology Data Exchange (ETDEWEB)

    Crofts, Oliver, E-mail: oliver.crofts@ccfe.ac.uk [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Loving, Antony; Iglesias, Daniel [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Coleman, Matti [EUROfusion Consortium, PPP& T Department, Boltzmannstraße 2, 85748 Garching (Germany); Siuko, Mikko [VTT Technical Research Centre of Finland, PO Box 1000, FI-02044 VTT, Espoo (Finland); Mittwollen, Martin [KIT Institut für Fördertechnik und Logistiksysteme, Gotthard-Franz-Straße 8, Geb.50.38, 76131 Karlsruhe (Germany); Queral, Vicente [CIEMAT Laboratorio Nacional de Fusión, Edif. 66, Avenida Complutense 40, 28040 Madrid (Spain); Vale, Alberto [IST, Instituto Superior Técnico, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Villedieu, Eric [CEA, IRFM, 13108 St Paul lez Durance (France)

    2016-11-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  20. Overview of progress on the European DEMO remote maintenance strategy

    International Nuclear Information System (INIS)

    Crofts, Oliver; Loving, Antony; Iglesias, Daniel; Coleman, Matti; Siuko, Mikko; Mittwollen, Martin; Queral, Vicente; Vale, Alberto; Villedieu, Eric

    2016-01-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  1. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  2. The development of remote repairing system, decontamination and in-cell remote inspection equipment

    International Nuclear Information System (INIS)

    Ishibashi, Yuzo; Toyoda, Osamu; Haginoya, Isao; Yamamoto, Ryuichi; Tanaka, Yasumasa

    1993-01-01

    PNC has been developing remote repair and inspection technologies for in-cell components in reprocessing Plants. In this report, several remote technologies such as remote dismantling and removal, decontamination, remote pipe maintenance and remote in-cell inspection equipment are described. (author)

  3. Alternative power supply systems for remote industrial customers

    Science.gov (United States)

    Kharlamova, N. V.; Khalyasmaa, A. I.; Eroshenko, S. A.

    2017-06-01

    The paper addresses the problem of alternative power supply of remote industrial clusters with renewable electric energy generation. As a result of different technologies comparison, consideration is given to wind energy application. The authors present a methodology of mean expected wind generation output calculation, based on Weibull distribution, which provides an effective express-tool for preliminary assessment of required installed generation capacity. The case study is based on real data including database of meteorological information, relief characteristics, power system topology etc. Wind generation feasibility estimation for a specific territory is followed by power flow calculations using Monte Carlo methodology. Finally, the paper provides a set of recommendations to ensure safe and reliable power supply for the final customers and, subsequently, to provide sustainable development of the regions, located far from megalopolises and industrial centres.

  4. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  5. Design of auxiliary shield for remote controlled metallographic microscope

    International Nuclear Information System (INIS)

    Matsui, Hiroki; Okamoto, Hisato

    2014-06-01

    The remote controlled optical microscope installed in the lead cell at the Reactor Fuel Examination Facility (RFEF) in Japan Atomic Energy Agency (JAEA) has been upgraded to a higher performance unit to study the effect of the microstructural evolution in clad material on the high burn-up fuel behavior under the accident condition. The optical pass of the new microscope requires a new through hole in the shielding lead wall of the cell. To meet safety regulations, auxiliary lead shieldings were designed to cover the lost shielding function of the cell wall. Particle and Heavy Ion Transport Code System (PHITS) was used to calculate and determine the shape and setting positions of the shielding unit. Seismic assessments of the unit were also performed. (author)

  6. Guidelines for the development of applicative software for supervising and remote electric power substations; Diretrizes de desenvolvimento de softwares aplicativos para as estacoes supervisoras e remotas

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Guilherme Moutinho; Soares, Wellington Zakhia; Morais, Arnoldo Magela [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    The increasing application of remote control supervision systems composed of regional operation centers (COR) and remote terminal units (UTR) creates the adequate conditions for the development and implementation of operational engineering functions in electric power substations (SE). In order to provide the necessary elements for such qualitative improvement, this work presents guidelines for the development of applicative soft-wares for the local control and supervision to be installed in CORs and UTRS, based in CEMIG`s, the electric power company of Minas Gerais State - Southeast Brazil, experience 4 refs.

  7. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  8. Virtual network computing: cross-platform remote display and collaboration software.

    Science.gov (United States)

    Konerding, D E

    1999-04-01

    VNC (Virtual Network Computing) is a computer program written to address the problem of cross-platform remote desktop/application display. VNC uses a client/server model in which an image of the desktop of the server is transmitted to the client and displayed. The client collects mouse and keyboard input from the user and transmits them back to the server. The VNC client and server can run on Windows 95/98/NT, MacOS, and Unix (including Linux) operating systems. VNC is multi-user on Unix machines (any number of servers can be run are unrelated to the primary display of the computer), while it is effectively single-user on Macintosh and Windows machines (only one server can be run, displaying the contents of the primary display of the server). The VNC servers can be configured to allow more than one client to connect at one time, effectively allowing collaboration through the shared desktop. I describe the function of VNC, provide details of installation, describe how it achieves its goal, and evaluate the use of VNC for molecular modelling. VNC is an extremely useful tool for collaboration, instruction, software development, and debugging of graphical programs with remote users.

  9. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  10. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  11. New receiving line for the remote-steering antenna of the 140 GHz CTS diagnostics in the FTU Tokamak

    Science.gov (United States)

    D'Arcangelo, O.; Bin, W.; Bruschi, A.; Cappelli, M.; Fanale, F.; Gittini, G.; Pallotta, F.; Rocchi, G.; Tudisco, O.; Garavaglia, S.; Granucci, G.; Moro, A.; Tuccillo, A. A.

    2018-01-01

    A new receiving antenna for collecting signals of the Collective Thomson Scattering (CTS) diagnostics in FTU Tokamak has been recently installed. The squared corrugated section and the precisely defined length make it possible to receive from different directions by remotely steering the receiving mirrors. This type of Remote-Steering (RS) antennas, being studied on FTU for the DEMO Electron Cyclotron Heating (ECH) system launch, is already installed on the W7- X stellarator and will be tested in the next campaign. The transmission of the signal from the antenna in the tokamak hall to the CTS diagnostics hall will be mainly realized by means of oversized circular corrugated waveguides carrying the hybrid HE11 (quasi-gaussian) waveguide mode, with inclusion of a special smooth-waveguide section and a short run of reduced-size square-corrugated waveguide through the tokamak bio-shield. The coupling between different waveguide types is made with ellipsoidal focusing mirrors, using quasi-optical matching formulas between the gaussian-shaped beams in input and output to the waveguides. In this work, after a complete study of feasibility of the overall line, a design for the receiving line will be proposed, in order to realize an executive layout to be used as a guideline for the commissioning phase.

  12. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  13. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  14. Remote residential photovoltaic systems in British Columbia: A study

    Energy Technology Data Exchange (ETDEWEB)

    Mathews, R B

    1989-01-01

    A survey of existing residential photovoltaic power systems in remote areas in British Columbia was conducted to collect data on system performance. The 80 respondents had systems with arrays ranging from 5 to 875 watts, costing from $200 to $14,000. An overwhelming majority of users expressed overall satisfaction with the contribution of photovoltaic technology to their life style. Specific advantages of photovoltaic systems over alternative energy sources included cost-effectiveness, low maintenance, lack of noise and pollution, and ease of operation. Problems with the systems included low winter power, unsatisfactory load matching, and improper operation of associated battery storage systems. It was noted that load profile estimation and system sizing calculations are difficult because control over user behavior with respect to the power system is nearly non-existent when compared to industrial installations. Low-level ampere-hour monitoring of 10 representative sites was carried out and results are presented, giving the power contributions of the photovoltaic system along with any backup system that may be present. Remote residential photovoltaic systems should continue to gain acceptance and more widespread use, especially as module costs drop and more efficient loads (especially appliances such as refrigerators) become practical. 10 figs., 2 tabs.

  15. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  16. Remote detection system

    International Nuclear Information System (INIS)

    Nixon, K.V.; France, S.W.; Garcia, C.; Hastings, R.D.

    1981-05-01

    A newly designed remote detection system has been developed at Los Alamos that allows the collection of high-resolution gamma-ray spectra and neutron data from a remote location. The system consists of the remote unit and a command unit. The remote unit collects data in a potentially hostile environment while the operator controls the unit by either radio or wire link from a safe position. Both units are battery powered and are housed in metal carrying cases

  17. Analysis of the economics of photovoltaic-diesel-battery energy systems for remote applications

    Science.gov (United States)

    Brainard, W. A.

    1983-01-01

    Computer simulations were conducted to analyze the performance and operating cost of a photovoltaic energy source combined with a diesel generator system and battery storage. The simulations were based on the load demand profiles used for the design of an all photovoltaic energy system installed in the remote Papago Indian Village of Schuchuli, Arizona. Twenty year simulations were run using solar insolation data from Phoenix SOLMET tapes. Total energy produced, energy consumed, operation and maintenance costs were calculated. The life cycle and levelized energy costs were determined for a variety of system configurations (i.e., varying amounts of photovoltaic array and battery storage).

  18. Cost-Optimal Pathways to 75% Fuel Reduction in Remote Alaskan Villages: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Simpkins, Travis; Cutler, Dylan; Hirsch, Brian; Olis, Dan; Anderson, Kate

    2015-10-28

    There are thousands of isolated, diesel-powered microgrids that deliver energy to remote communities around the world at very high energy costs. The Remote Communities Renewable Energy program aims to help these communities reduce their fuel consumption and lower their energy costs through the use of high penetration renewable energy. As part of this program, the REopt modeling platform for energy system integration and optimization was used to analyze cost-optimal pathways toward achieving a combined 75% reduction in diesel fuel and fuel oil consumption in a select Alaskan village. In addition to the existing diesel generator and fuel oil heating technologies, the model was able to select from among wind, battery storage, and dispatchable electric heaters to meet the electrical and thermal loads. The model results indicate that while 75% fuel reduction appears to be technically feasible it may not be economically viable at this time. When the fuel reduction target was relaxed, the results indicate that by installing high-penetration renewable energy, the community could lower their energy costs by 21% while still reducing their fuel consumption by 54%.

  19. Development of a remote controlled fatigue testing apparatus at elevated temperature in controlled environment

    International Nuclear Information System (INIS)

    Ohmi, Masao; Mimura, Hideaki; Ishii, Toshimitsu

    1996-02-01

    The fatigue characteristics of reactor structural materials at high temperature are necessary to be evaluated for ensuring the safety of the High Temperature engineering Test Reactor (HTTR). Especially, the high temperature test data on safety research such as low cycle fatigue property and crack propagation property for reactor pressure vessel material are important for the development of the HTTR. Responding to these needs, a remote controlled type fatigue testing machine has been developed and installed in a hot cell of JMTR Hot Laboratory to get the fatigue data of irradiated materials. The machine was developed modifying a commercially available electro-hydraulic servo type fatigue testing machine to withstand radiation and be remotely operated, and mainly consists of a testing machine frame, environment chamber, extensometer, actuator and vacuum exhaust system. It has been confirmed that the machine has good performance to obtain low cycle fatigue data through many demonstration tests on unirradiated and irradiated specimens. (author)

  20. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...