  1. The operational challenge of remote maintenance

    International Nuclear Information System (INIS)

    Forsythe, L.

    2015-01-01

    Full text of publication follows. With the declining supply of fossil fuels that are used in power stations today, and the ongoing concern over climate change, nuclear fusion is one of the most promising options for generating large amounts of carbon-free energy in the future. Fuel supplies for fusion will be available for millions of years, with 1 kg of fusion fuel providing the same amount of energy as 10 thousand tonnes of fossil fuel. Unlike conventional fission reactors, the radioactive waste produced from fusion is short-lived, and will be safe to dispose of conventionally within 100 years. Although fusion has the huge advantage of being a carbon free energy source, there are complexities when it comes to maintaining the machine. Due to the nature of the fusion reaction, the components within the area of the reactor vacuum vessel become radioactive, which requires maintenance and modifications to be conducted remotely to protect human operators. Remote maintenance is the use of manipulators to carry out tasks in challenging or hostile environments, which would otherwise cause harm to humans. Remote handling slave manipulators do the work of a human by mimicking the movements from a master robotic manipulator that is controlled by a human operator. This means that remote handling can be used in many other areas other too, such as space; fission power plants; sub-sea; and nuclear material handling or in adverse environments such as: low or high temperature; chemically contaminated; combustible and low oxygen environments. Remote maintenance requires specialist engineers to take into consideration many aspects normally taken for granted when carrying out a task manually. Constraints such as the space around us; viewing and lighting; the human body's dexterity and flexibility; the weight and centre of gravity of tools and components, and how we securely grip and handle them; and access to fixings and fastenings. All these are factors that require careful

  2. Remote operation and maintenance demonstration facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D.; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock up various hot cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups

  3. Remote Operation and Maintenance Demonstration Facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock-up various hot-cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and the other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups. 6 figures

  4. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  5. Remote operation and maintenance support services for nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Hiroki; Higuma, Koji; Shimizu, Shunichi; Sakuma, Masatake; Sonoda, Yukio; Kanemoto, Shigeru

    2004-01-01

    Toshiba Corporation constructed e-Toshiba Operating Plant Service (e-TOPS TM ) system and began remote operation and maintenance support service for nuclear power plants. The service put into practice remote operation and maintenance by harmony of information technologies such as internet and mobile, and nuclear power measurement/diagnostic technologies and security techniques. Outline of e-TOPS TM , remote-control service, -inspection system, -diagnostic service and technologies support service are explained. Construction, objects and application effects of e-TOPS TM , remote diagnostic system using image treatment techniques, construction of device record card control system are illustrated. (S.Y.)

  6. Comparison of all-remote and personnel access maintenance operations for INTOR

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, M.Y.; Stasko, R.R.

    1985-01-01

    The INTOR reference design was developed to permit limited maintenance operations external to the reactor in a ''hands-on'' mode; all internal operations would be remotely accomplished. The design embodies those requirements for shielding, tritium containment and cleanup, and confinement of contaminated particulate matter to permit personnel access. The cost reflects these requirements, at least first order. The impact of personnel access on the reactor design and its costs are cause to reexamine the maintenance approach on which much of the present configuration is based. The purpose of this study is to compare the benefits and costs associated with personnel access maintenance procedures to those associated with all-remote maintenance procedures and to identify modifications to the baseline design that could enhance maintenance operations

  7. Remote maintenance development

    International Nuclear Information System (INIS)

    Zook, C.R.

    1979-01-01

    The concept of remote maintenance as it pertains to nuclear fuel fabrication facilities is quite unique. The future may require completely remote facilities where maintenance will be performed by hybrid manipulators/robots. These units will be capable of being preprogrammed for automatic operation or manually operated with the operator becoming a part of the closed loop control system. These robots will mesh television, computer control, and direct force feedback manual control in a usable new concept of robotics

  8. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  9. Remote Operation and Maintenance Demonstration Facility at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1986-01-01

    The Remote Operation and Maintenance Demonstration (ROMD) Facility at the Oak Ridge National Laboratory has been developed by the Consolidated Fuel Reprocessing Program to demonstrate remote handling concepts on advanced nuclear fuel reprocessing equipment and for other programs of national interest. The ROMD facility is a large-volume high-bay area that encloses a complete, technologically advanced remote maintenance system and full-scale development reprocessing equipment. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the US Department of Energy (DOE), the Power Reactor and Nuclear Fuels Development Corporation of Japan, the US Navy, and the National Aeronautics and Space Administration. Extensive tests of manipulative systems and remote maintainability of process equipment have been performed. This paper describes the ROMD facility and key remote maintenance equipment and presents a summary of major experimental activities. 7 refs., 6 figs

  10. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1998-01-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  11. Remote maintenance development for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Shibanuma, Kiyoshi

    1998-04-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  12. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, Bernhard

    2008-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper

  13. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, B.

    2007-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development - Remote handling task logistics and resource management - Command, control and human-machine interface system - Viewing and camera systems - Virtual Reality and Augmented Reality software - Automatic path planning and collision avoidance - Remote transfer of heavy loads - Maintainability of RH Equipment - Reliability, redundant systems and safety - Rationalisation and modularity in both hardware and software - Recovery from failure modes - Condition monitoring and fault detection/prediction - Ability to deal with unforeseen problems Oxford Technologies Ltd has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET Remote Handling experience and the ITER Hot Cell design and layout are given throughout this paper. (orig.)

  14. Setting up and managing a remote maintenance operation for fusion

    Energy Technology Data Exchange (ETDEWEB)

    Haist, Bernhard [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon OX14 1RJ (United Kingdom)], E-mail: Bernhard.Haist@oxfordtechnologies.co.uk

    2008-12-15

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper.

  15. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  16. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  17. Remote maintenance system for nuclear facilities

    International Nuclear Information System (INIS)

    Maeda, Masafumi

    1993-01-01

    In the facilities related to atomic energy, from the viewpoint of the reduction of radiation exposure of workers and the heightening of the rate of operation of the facilities, the development of remote maintenance system is regarded as important. Meidensha Electric Manufacturing Co., Ltd. developed the bilateral control type manipulator, BILARM-83, in 1979, and has developed high performance manipulator systems. As the design of the plant that realizes the remote operation maintenance of process machinery and equipment during plant operation, the remote maintenance system by canyon cell techniques, which was adopted in Savannah River plant, USA, and has been operated for nearly 50 years, has been known. The concept of the full remote maintenance system by large scale cell techniques was shown and has been developed by Power Reactor and Nuclear Fuel Development Corp. In order to realize the remote maintenance of such large scale cells, Meidensha is developing the both arm type bilateral servo manipulator, the single arm type power manipulator, the transport system for moving them, the power and signal system and so on. Those systems were adopted for the glass solidification facilities. (K.I.)

  18. Remote maintenance concepts for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Davis, F.C.; Hager, E.R.

    1988-01-01

    Because deuterium-tritium fuel will be used in the Compact Ignition Tokamak (CIT), remote handling technology is needed to carry out some maintenance operations on the machine. In keeping with the compact, low-cost nature of CIT, remote maintenance is provided only for systems with the highest probability of failure. Remote operations include removing, repairing (if feasible), and replacing such components as thermal protection tiles on the first wall, radio-frequency (rf) heating modules, and diagnostic modules. For maintenance inside the vacuum vessel, major pieces of equipment under development include an articulated boom manipulator with servomanipulators, an inspection manipulator, and special tooling. For maintenance outside the cryostat, remote equipment includes a bridge-mounted manipulator system, equipment for decontamination and hot cell activities, and for handling and packaging solid radioactive waste. The conceptual design phase of the CIT project is nearing completion; research and development activities in support of the project include demonstrations of remote maintenance operations on full-size partial mock-ups. 9 figs

  19. Remote maintenance for fusion experimental reactor

    International Nuclear Information System (INIS)

    Koizumi, Koichi; Takeda, Nobukazu

    2000-01-01

    Here was introduced on maintenance of reactor core portion operated by remote control among maintenance of the International Thermonuclear Experimental Reactor (ITER) begun on its design since 1988 under international cooperation of U.S.A., Europe, Russia and Japan. Every appliances constructing the reactor core portion is necessary to carry out all of their inspection and maintenance by using remote controlled apparatus because of their radiation due to neutron generated by DT combustion of plasma. For engineering design activity (EDA) in ITER, not only design and development of the remote control appliances but also design under consideration of remote maintenance for from structural design of maintained objective appliances to access method to appliances, transportation and preservation method of radiated matters, and out-reactor maintenance in a hot cell, is now under progress. Here were also reported on basic concept on maintenance and conservation of ITER, maintenance design of diverter and blanket with high maintenance frequency and present state on development of maintenance appliances. (G.K.)

  20. Ex-vessel remote maintenance for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist in removing and repairing such components as diagnostic modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the plasma chamber includes a bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid-radiation-waste-handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design were addressed in fiscal year (FY) 1987, including conceptual designs of manipulator systems, the start of a remote equipment research and development (RandD) program, and definition of the hot cell, decon, and equipment repair facility requirements. R and D work included preliminary demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development (ROMD) Facility. 1 ref., 6 figs

  1. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  2. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2007-01-01

    ITER is a joint international research and development project that aims to demonstrate the scientific and technological feasibility of fusion power. As soon as the plasma operation begins using tritium, the replacement of the vacuum vessel internal components will need to be done with remote handling techniques. To accomplish these operations ITER has equipped itself with a Remote Maintenance System; this includes the Remote Handling equipment set and the Hot Cell facility. Both need to work in a cooperative way, with the aim of minimizing the machine shutdown periods and to maximize the machine availability. The ITER Remote Handling equipment set is required to be available, robust, reliable and retrievable. The machine components, to be remotely handle-able, are required to be designed simply so as to ease their maintenance. The baseline ITER Remote Handling equipment is described. The ITER Hot Cell Facility is required to provide a controlled and shielded area for the execution of repair operations (carried out using dedicated remote handling equipment) on those activated components which need to be returned to service, inside the vacuum vessel. The Hot Cell provides also the equipment and space for the processing and temporary storage of the operational and decommissioning radwaste. A conceptual ITER Hot Cell Facility is described. (orig.)

  3. Remote Maintenance Design Guide for Compact Processing Units

    Energy Technology Data Exchange (ETDEWEB)

    Draper, J.V.

    2000-07-13

    Oak Ridge National Laboratory (ORNL) Robotics and Process Systems (RPSD) personnel have extensive experience working with remotely operated and maintained systems. These systems require expert knowledge in teleoperation, human factors, telerobotics, and other robotic devices so that remote equipment may be manipulated, operated, serviced, surveyed, and moved about in a hazardous environment. The RPSD staff has a wealth of experience in this area, including knowledge in the broad topics of human factors, modular electronics, modular mechanical systems, hardware design, and specialized tooling. Examples of projects that illustrate and highlight RPSD's unique experience in remote systems design and application include the following: (1) design of a remote shear and remote dissolver systems in support of U.S. Department of Energy (DOE) fuel recycling research and nuclear power missions; (2) building remotely operated mobile systems for metrology and characterizing hazardous facilities in support of remote operations within those facilities; (3) construction of modular robotic arms, including the Laboratory Telerobotic Manipulator, which was designed for the National Aeronautics and Space Administration (NASA) and the Advanced ServoManipulator, which was designed for the DOE; (4) design of remotely operated laboratories, including chemical analysis and biochemical processing laboratories; (5) construction of remote systems for environmental clean up and characterization, including underwater, buried waste, underground storage tank (UST) and decontamination and dismantlement (D&D) applications. Remote maintenance has played a significant role in fuel reprocessing because of combined chemical and radiological contamination. Furthermore, remote maintenance is expected to play a strong role in future waste remediation. The compact processing units (CPUs) being designed for use in underground waste storage tank remediation are examples of improvements in systems

  4. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  5. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology to carry out maintenance operations on auxiliary machine components. These operations consist of removing and repairing components such as diagnostics and radio frequency (rf) heating modules using remotely operated maintenance equipment. The major equipment that is being developed to accomplish maintenance external to the plasma chamber includes the bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid rad-waste handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design have been addressed in fiscal year (FY) 1987. These included conceptual designs of manipulator systems, the start of a remote equipment research and development (R and D) program, and definition of the hot cell, decon, and equipment repair facility requirements. The manipulator work included investigating transporters and viewing/lighting subsystems. In each case, existing commercial units are being assessed initially, along with viable alternative approaches. R and D work also included demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development Facility

  6. Remote assembly and maintenance of fusion reactors

    International Nuclear Information System (INIS)

    Becquet, M.C.; Farfaletti-Casali, F.

    1991-01-01

    This paper intend to present the state of the art in the field of remote assembly and maintenance, including system analysis design and operation for controlled fusion device such as JET, and the next NET and ITER reactors. The operational constraints of fusion reactors with respect to temperature, radiations dose rates and cumulated doses are considered with the resulting design requirements. Concepts like articulated boom, in-vessel vehicle and blanket handling device are presented. The close relations between computer simulations and experimental validation of those concepts are emphasized to ensure reliability of the operational behavior. Mockups and prototypes in reduced and full scale, as operating machines are described to illustrate the progress in remote operations for fusion reactors. The developments achieved at the Institute for System Engineering and Informatics of the Joint Research Center, in the field of remote blanket maintenance, reliability assessment of RH systems and remote cut and welding of lips joints are considered. (author)

  7. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology for ex-vessel maintenance operations on auxiliary machine components. These operations consist of repairing and replacing components such as diagnostic, radio-frequency (rf) heating, and fueling systems using remotely operated maintenance equipment in the test cell. In addition, ex-vessel maintenance design also includes developing hot cell facilities for equipment decontamination, repair, and solid radioactive waste handling. The test cell maintenance philosophy is markedly influenced by the neutron/gamma shield surrounding the machine that allows personal access into the test cell one day after shutdown. Hence, maintenance operations can be performed hands-on in the test cell with the shield intact and must be remotely performed when the shield is disassembled for machine access. The constricted access to the auxiliary components of the machine affect the design requirements for the maintenance equipment and impose major spatial constraints. Several major areas of the maintenance system design are being addressed in fiscal year 1987. These include conceptual design of the manipulator system, preliminary remote equipment research and development, and definition of the hot cell, decontamination, and equipment repair facility requirements. The manipulator work includes investigating transporters and viewing/lighting subsystems. 2 figs

  8. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  9. In-vessel remote maintenance of the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Tabor, M.A.; Hager, E.R.; Creedon, R.L.; Fisher, M.V.; Atkin, S.D.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is the first deuterium-tritium (D-T) fusion device that will study the physics of an ignited plasma. The ability of the tokamak vacuum vessel to be maintained remotely while under vacuum has not been fully demonstrated on previous machines, and this ability will be critical to the efficient and safe operation of ignition devices. Although manned entry into the CIT vacuum vessel will be possible during the nonactivated stages of operation, remotely automated equipment will be used to assist in initial assembly of the vessel as well as to maintain all in-vessel components once the D-T burn is achieved. Remote maintenance and operation will be routinely required for replacement of thermal protection tiles, inspection of components, leak detection, and repair welding activities. Conceptual design to support these remote maintenance activities has been integrated with the conceptual design of the in-vessel components to provide a complete and practical remote maintenance system for CIT. The primary remote assembly and maintenance operations on CIT will be accomplished through two dedicated 37- x 100-cm ports on the main toroidal vessel. Each port contains a single articulated boom manipulator (ABM), which is capable of accessing half of the torus. The proposed ABM consists of a movable carriage assembly, telescoping two-part mast, and articulated link sections. 1 ref

  10. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    Energy Technology Data Exchange (ETDEWEB)

    Utoh, Hiroyasu, E-mail: uto.hiroyasu@jaea.go.jp; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-10-15

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  11. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    International Nuclear Information System (INIS)

    Utoh, Hiroyasu; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-01-01

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  12. Pre-conceptual design assessment of DEMO remote maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Loving, A., E-mail: antony.loving@ccfe.ac.uk [EURATOM/Culham Center Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Crofts, O.; Sykes, N.; Iglesias, D.; Coleman, M.; Thomas, J. [EURATOM/Culham Center Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Harman, J. [EFDA Close Support Unit Garching, Boltzmannstaße 2, D-85748 Garching Bei München (Germany); Fischer, U. [Karlsruhe Institute of Technology, Institute for Neutron Physics and Reactor Technology, Hermann-von-Helmholtz-Platz 1, D-76344 Eggenstein-Leopoldshafen (Germany); Sanz, J. [Instituto de Fusión Nuclear/UPM, Madrid (Spain); Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1000, FI-02044 VTT (Finland); Mittwollen, M. [Karlsruhe Institute of Technology, Institut für Fördertechnik und Logistiksysteme, Gotthard-Franz-Straße 8, Geb.50.38, 76131 Karlsruhe (Germany)

    2014-10-15

    EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/2013, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally valuable in communicating the complexity and scale of the required operations. Through these simulations, estimates of the maintenance task durations have been possible demonstrating that a full replacement of the blankets within 6 months could be achieved. The design of the first wall, including the need to use sacrificial limiters must still be investigated. In support of the maintenance operations, a first indication of the requirements of an Active Maintenance Facility (AMF) has been elaborated.

  13. Virtual analysis of the remote operation of the ACP

    International Nuclear Information System (INIS)

    Yoon, Ji Sup; Kim, Sung Hyun; Song, Tai Gil; Lim, Kwang Mook

    2005-01-01

    The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance method needs to be provided. To provide such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in a computer, not in a real environment. In this way the graphic simulator and substantially reduce the design cost of the remote operation process and the equipment. Also it can provide new operation concept that is more reliable, easier to implement, and easier to understand

  14. New remote maintenance approach for TPX

    International Nuclear Information System (INIS)

    Davis, F.C.; Walker, M.S.; Brown, T.G.

    1993-01-01

    The Tokamak Physics Experiment (TPX), to be located at Princeton Plasma Physics Laboratory, will be a steady-state, high-performance fusion machine. It will use hydrogen fuel during its original operation, deuterium-deuterium (D-D) fuel for an extended intermediate period of time and then a limited number of runs using deuterium-tritium (D-T) fuel. The D-D operations wig generate neutron fluxes that will activate materials of the vacuum vessel. From that point on, the resulting ionizing radiation, which will continue to increase, particularly during D-T operation, will prevent personnel access into the vessel to perform either scheduled or unscheduled maintenance activities. All activities performed within the vacuum vessel must be accomplished using remote means. TPX has taken a new approach for remote maintenance of the components within the vacuum vessel. This document describes the system that is being developed

  15. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  16. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    Rennich, M.J.; Nelson, B.E.

    1994-01-01

    The Tokamak Physics Experiment machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional ''hands-on'' procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and PFC structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  17. A remote maintenance robot system for a pulsed nuclear reactor

    International Nuclear Information System (INIS)

    Thunborg, S.

    1987-01-01

    This paper presents a remote maintenance robot system for use in a hazardous environment. The system consists of turntable, robot and hoist subsystems which operate under the control of a supervisory computer to perform coordinated programmed maintenance operations on a pulsed nuclear reactor. The system is operational

  18. Robotics and remote maintenance concepts for fusion machines

    International Nuclear Information System (INIS)

    1989-02-01

    Descriptions of operation and maintenance of current tokamaks (TFTR, JET, JT-60) is discussed in the context of radioactivation resulting from thermonuclear reactions. Plans for future devices (NET, CIT, FGR) with respect to remote handling, maintenance, measurements, and robotics are discussed. Refs, figs and tabs

  19. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  20. Remote mixed oxide fabrication facility development. Volume 2. State-of-the-art review of remote maintenance system technology

    International Nuclear Information System (INIS)

    Horgos, R.M.; Masch, M.L.

    1979-06-01

    This report provides a state-of-the-art review of remote systems technology, which includes manipulators, process connectors, vision systems and specialized process systems. A proposed mixed oxide fuel fabrication facility was reviewed and evaluated for identification of major remote maintenance and repair tasks. The technological areas were evaluated on the basis of their suitability or applicability for remote maintenance and repair of a proposed fully remote operating mixed oxide fuel fabrication facility. A technological base exists from which the design criteria for a reliable, remote operating facility can be established. Commercially available systems and components, along with those remote technologies now in development, will require modifications to adapt them to specific plant designs and requirements

  1. Remote maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Herndon, J.N.

    1985-01-01

    Remote maintenance techniques applied in large-scale nuclear fuel reprocessing plants are reviewed with particular attention to the three major maintenance philosophy groupings: contact, remote crane canyon, and remote/contact. Examples are given, and the relative success of each type is discussed. Probable future directions for large-scale reprocessing plant maintenance are described along with advanced manipulation systems for application in the plants. The remote maintenance development program within the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is also described. 19 refs., 19 figs

  2. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  3. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  4. Remote maintenance design for Fusion Experimental Reactor (FER)

    International Nuclear Information System (INIS)

    Tachikawa, K.; Iida, H.; Nishio, S.; Tone, T.; Aota, T.; Iwamoto, T.; Niikura, S.; Nishizawa, H.

    1984-01-01

    Design of Fusion Experimental Reactor, FER, has been conducted by Japan Atomic Energy Research Institute (JAERI) since 1981. Two typical reactors can be classified in general from the viewpoints of remote maintenance among four design concepts of FER. In the case of the type 1 FER, the torus module consists of shield structure and blanket, and the connective joints between toruses provided at the outer region of the reactor. As for the type 2 FER, the shield structure is joined with the vacuum cryostat, and only the blanket module is allowed to move, but connection between toruses are located in the inner region of the reactor. Comparing type 1 with type 2 FER, this paper describes on the remote maintenance of FER including reactor configurations, work procedures, remote systems/equipments, repairing facility and future R and D problems. Reviewing design studies and investigation for the existing robotics technologies, R and D for FER remote maintenance technology should be performed under the reasonable long-term program. The main items of remote technology required to start urgently are multi-purpose manipulator system with performance of dextrousity, tele-viewing system which reduces operator fatigue and remote tests for commercially available components

  5. Remote handling design for moderator-reflector maintenance in JSNS

    International Nuclear Information System (INIS)

    Teshigawara, Makoto; Aizawa, Hideyuki; Harada, Masahide; Kinoshita, Hidetaka; Meigo, Shinichiro; Maekawa, Fujio; Kaminaga, Masanori; Kato, Takashi; Ikeda, Yujiro

    2005-05-01

    This report introduces the present design status of remote-handling devices for activated and used components such as moderator and reflector in a spallation neutron source of the Material and Life Science Facility (MLF) at J-PARC (Japan Proton Accelerator Research Complex). The design concept and maintenance scenario are also mentioned. A key maintenance scenario adopts that the used components should be taken out from the MLF to the other storage facility after the volume reduction of them. Almost full remote handling is available to the maintenance work except for the connection/disconnection pipes of the cooling water. Remote handling for the cooling water system is under designing and it will be prepared before being significant radiation dose by accumulation of beryllium ( 7 Be) in future. Total six remote handling devices are used for moderator-reflector maintenance. They are also available to the proton beam window and muon target maintenance. Maintenance scenario is separated into two works. One is to replace used components to new ones during beam-stop and the other is dispose used components during beam operation. Required period of replacement work is estimated to be ∼15 days, on the other hand, the disposal work is ∼26 days after dry up work (∼30 days), respectively. Study of the maintenance scenario and the remote handling design brings about the reasonable procedures and period of the maintenance work. (author)

  6. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  7. Remotex: a new concept for efficient remote operation and maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Feldman, M.J.; White, J.R.

    1980-01-01

    Remotex is a concept of remote operation and maintenance that utilizes advanced manipulator design to improve plant operating efficiency, reduce personnel exposure, and improve safeguards and diversion resistance. It is a concept developed over the past two years in the conceptual design of the Hot Experimental Facility (HEF), a mechanically intense pilot plant facility designed to demonstrate reprocessng technology for early US breeder demonstration reactors. The Remotex concept is directly applicable to all segments of nuclear and nonnuclear industries where work tasks or conditions exist that are hazardous to the health of man

  8. BPX commitment to total remote maintenance

    International Nuclear Information System (INIS)

    Davis, F.C.; Burgess, T.W.

    1991-01-01

    The Burning Plasma Experiment (BPX), to be located at Princeton Plasma Physics Laboratory, is the next major experimental machine in the US Fusion Program. It will be fueled with deuterium-tritium (D-T) that, when burned, will generate high-energy neutrons. This will activate the various materials used in construction of the machine, which will result in high levels of gamma radiation. Any subsequent maintenance activities on the machine or in the test cell area must be performed remotely. The initial criteria for BPX assumed that failure of toroidal field (TF) coil or poloidal field (PF) coil was an unlikely event. Therefore, no provisions were made for remote replacement. Expected failures were limited to the plasma-facing components and the external auxiliary equipment such as heating systems and diagnostics. Recent coil failures experienced at the Tokamak Fusion Test Reactor (TFTR), the Joint European Torus (JET), JT-60, and Tore Supra caused the BPX project staff to reconsider the need for remote replacement. A study was undertaken to investigate how the project would be affected if the capability to recover from a coil failure were required. Potential effects including configuration changes to the machine and facility, project cost, and project operation were considered. The study revealed that it is indeed feasible to design BPX for remote recovery from any coil failure. However, for this to be accomplished effectively, it is imperative to incorporate the necessary remote maintenance features of the components to be remotely replaced into the original design along with all of the other functional features. The remote maintenance capability cannot be retrofitted after the design is complete or the equipment is built. This paper discusses the impacts of the coil remote replacement study and the subsequent changes to the design. 4 figs., 1 tab

  9. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  10. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  11. ITER L 6 equatorial maintenance duct remote handling study

    International Nuclear Information System (INIS)

    Millard, J.

    1996-09-01

    The status and conclusions of a preliminary study of equatorial maintenance duct remote handling is reported. Due to issues with the original duct design a significant portion of the study had to be refocused on equatorial duct layout studies. The study gives an overview of some of the options for design of these ducts and the impact of the design on the equipment to work in the duct. To develop a remote handling concept for creating access through the ducts the following design tasks should be performed: define the operations sequences for equatorial maintenance duct opening and closing; review the remote handling requirements for equatorial maintenance duct opening and closing; design concept for door and pipe handling equipment and to propose preliminary procedures for material handling outsides the duct. 35 figs

  12. Large remote manipulator operating and maintenance experience at IEM cell

    International Nuclear Information System (INIS)

    Hicks, D.F.; McGuinness, P.W.

    1985-01-01

    The Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) has two large Electro-Mechanical Manipulators (EMM's). These manipulators are used for cell operations (processing of reactor core components) as well as general cell maintenance. From our eleven years of operation and maintenance experience with these large EMM's, we have learned many lessons concerning manipulator design. This paper describes the IEM Cell EMM design features and discusses operating and maintenance experience at the IEM Cell

  13. Remote maintenance of tandem mirror hybrid coils

    International Nuclear Information System (INIS)

    Dietz, L.P.

    1983-01-01

    Hybrid Coils (superconducting coils with normal conducting inserts) are being employed with increasing frequency on Tandem Mirror Devices to obtain high field strengths. The normal conducting copper inserts are short lived in comparison to their encircling superconductors. It becomes desirable, therefore, to devise design features and maintenance procedures to replace the inner normal conducting coils without simultaneously replacing the longer lived (and significantly more costly) superconducting coils. The high neutron wall loadings require that the task be accomplished by remote control. The approach is to permanently mount the coil assemblies on track mounted carriages which serve, during machine operation merely as structural supports, but during maintenance procedures as moveable transport devices. The carriages incorporate all necessary provisions to facilitate remote maintenance operations and to adjust and align the coil assemblies with respect to adjacent machine components. The vacuum vessel is severed on both sides of the hybrid coil by means of a remote cutting machine. The entire coil is transported horizontally, normal to the machine axis to a nearby repair station. Prepositioned carriage mounted repair equipment at the repair station withdraws the damaged normal coil as a single entity and inserts a preassembled spare unit. The repaired hybrid coil is reassembled to the reactor. A cost and risk effective procedure has been evolved to maintain one of the more critical components of a Tandem Mirror Machine

  14. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  15. ITER Remote Maintenance System (IRMS) lifecycle management

    Energy Technology Data Exchange (ETDEWEB)

    Tesini, Alessandro, E-mail: alessandro.tesini@iter.org [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Otto' , Bede [Oxford Technologies Ltd, 7, Nuffield Way, Abingdon, Oxon OX14 1RJ (United Kingdom); Blight, John [FAAST 31c Allee de la Granette, 13600 Ceyreste (France); Choi, Chang-Hwan; Friconneau, Jean-Pierre; Gotewal, Krishan Kumar; Hamilton, David [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Heckendorn, Frank [FD Technologies, PO Box 6686, Aiken, SC (United States); Martins, Jean-Pierre [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Marty, Thomas [Westinghouse, 122, avenue de Hambourg, 13008 Marseille (France); Nakahira, Masataka; Palmer, Jim; Subramanian, Rajendran [ITER Organization, CS 90 046, 13067 St. Paul Lez Durance Cedex (France)

    2011-10-15

    The availability of the ITER machine to perform its scientific program is strongly dependent on the performance of the different Remote Handling (RH) systems constituting the ITER Remote Maintenance System (IRMS). The lifecycle of the IRMS will largely exceed 40 years from initial concept design and proof testing through to machine decommissioning. Such a long lifecycle requires that a rigorous approach is put in place to guarantee the technical capabilities of the highly innovative IRMS, its efficiency and its availability. For this purpose, an IRMS System Engineering and IRMS lifecycle management approach has been adopted by ITER. The approach aims at ensuring the IRMS full operability and availability at an acceptable cost of ownership over the full ITER machine assembly and operations period. The IRMS lifecycle management method described in this paper covers such subjects as specific requirements for IRMS design reviews, monitoring during manufacture, factory and site acceptance testing, integrated commissioning, decontamination, maintenance and re-qualification strategies, requirements for Integrated Logistical Support during operations. The updating and implementation of the IRMS lifecycle strategy and this procedure will be managed and monitored by the Remote Handling Integrated Product Team (RH-IPT). Although developed for the IRMS, the basic principles and procedures of lifecycle management could be applied to other ITER plant systems whose reliability and availability will be essential for the continued operation of the ITER machine.

  16. ITER Remote Maintenance System (IRMS) lifecycle management

    International Nuclear Information System (INIS)

    Tesini, Alessandro; Otto', Bede; Blight, John; Choi, Chang-Hwan; Friconneau, Jean-Pierre; Gotewal, Krishan Kumar; Hamilton, David; Heckendorn, Frank; Martins, Jean-Pierre; Marty, Thomas; Nakahira, Masataka; Palmer, Jim; Subramanian, Rajendran

    2011-01-01

    The availability of the ITER machine to perform its scientific program is strongly dependent on the performance of the different Remote Handling (RH) systems constituting the ITER Remote Maintenance System (IRMS). The lifecycle of the IRMS will largely exceed 40 years from initial concept design and proof testing through to machine decommissioning. Such a long lifecycle requires that a rigorous approach is put in place to guarantee the technical capabilities of the highly innovative IRMS, its efficiency and its availability. For this purpose, an IRMS System Engineering and IRMS lifecycle management approach has been adopted by ITER. The approach aims at ensuring the IRMS full operability and availability at an acceptable cost of ownership over the full ITER machine assembly and operations period. The IRMS lifecycle management method described in this paper covers such subjects as specific requirements for IRMS design reviews, monitoring during manufacture, factory and site acceptance testing, integrated commissioning, decontamination, maintenance and re-qualification strategies, requirements for Integrated Logistical Support during operations. The updating and implementation of the IRMS lifecycle strategy and this procedure will be managed and monitored by the Remote Handling Integrated Product Team (RH-IPT). Although developed for the IRMS, the basic principles and procedures of lifecycle management could be applied to other ITER plant systems whose reliability and availability will be essential for the continued operation of the ITER machine.

  17. Analysis of ITER upper port plug remote handling maintenance scenarios

    International Nuclear Information System (INIS)

    Koning, J.F.; Baar, M.R. de; Elzendoorn, B.S.Q.; Heemskerk, C.J.M.; Ronden, D.M.S.; Schuth, W.J.

    2012-01-01

    Highlights: ► Remote Handling Study Centre: providing RH compatibility analysis. ► Simulation: virtual reality including kinematics and realtime physics simulator. ► Applied on analysis of RH compatibility of Upper Launcher component replacement. ► Resulting in lowered maintenance procedure time and lessons learned. - Abstract: The ITER tokamak has a modular design, with port plugs, blanket modules and divertor cassettes. This set-up allows for maintenance of diagnostics, heating systems and first wall elements. The maintenance can be done in situ, or in the Hot Cell. Safe and effective remote handling (RH) will be ensured by the RH requirements and standards. Compliance is verified through remote handling compatibility assessments at the ITER Design Review milestones. The Remote Handling Study Centre at FOM Institute DIFFER is created to study ITER RH maintenance processes at different levels of complexity, from relatively simple situational awareness checks using snap-shots in the CAD system, time studies using virtual reality (VR) animations, to extensive operational sequence validation with multiple operators in real-time. The multi-operator facility mimics an RH work-cell as presently foreseen in the ITER RH control room. Novel VR technology is used to create a realistic setting in which a team of RH operators can interact with virtual ITER environments. A physics engine is used to emulate real-time contact interaction as to provide realistic haptic feed-back. Complex interactions between the RH operators and the control room system software are tested. RH task performance is quantified and operational resource usage estimated. The article provides a description and lessons learned from a recent study on replacement of the Steering Mirror Assembly on the ECRH (Electron Cyclotron Resonance Heating) Upper Launcher port plug.

  18. Analysis of ITER upper port plug remote handling maintenance scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Koning, J.F., E-mail: j.f.koning@heemskerk-innovative.nl [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Baar, M.R. de; Elzendoorn, B.S.Q. [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Ronden, D.M.S.; Schuth, W.J. [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands)

    2012-08-15

    Highlights: Black-Right-Pointing-Pointer Remote Handling Study Centre: providing RH compatibility analysis. Black-Right-Pointing-Pointer Simulation: virtual reality including kinematics and realtime physics simulator. Black-Right-Pointing-Pointer Applied on analysis of RH compatibility of Upper Launcher component replacement. Black-Right-Pointing-Pointer Resulting in lowered maintenance procedure time and lessons learned. - Abstract: The ITER tokamak has a modular design, with port plugs, blanket modules and divertor cassettes. This set-up allows for maintenance of diagnostics, heating systems and first wall elements. The maintenance can be done in situ, or in the Hot Cell. Safe and effective remote handling (RH) will be ensured by the RH requirements and standards. Compliance is verified through remote handling compatibility assessments at the ITER Design Review milestones. The Remote Handling Study Centre at FOM Institute DIFFER is created to study ITER RH maintenance processes at different levels of complexity, from relatively simple situational awareness checks using snap-shots in the CAD system, time studies using virtual reality (VR) animations, to extensive operational sequence validation with multiple operators in real-time. The multi-operator facility mimics an RH work-cell as presently foreseen in the ITER RH control room. Novel VR technology is used to create a realistic setting in which a team of RH operators can interact with virtual ITER environments. A physics engine is used to emulate real-time contact interaction as to provide realistic haptic feed-back. Complex interactions between the RH operators and the control room system software are tested. RH task performance is quantified and operational resource usage estimated. The article provides a description and lessons learned from a recent study on replacement of the Steering Mirror Assembly on the ECRH (Electron Cyclotron Resonance Heating) Upper Launcher port plug.

  19. Remote maintenance design activities and research and development accomplishments for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology in order to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (RF) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance operations internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For operations external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radioactive waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. (orig.)

  20. Remote maintenance in the building of the reactor of power plants

    International Nuclear Information System (INIS)

    Bonin, R.

    1984-01-01

    Examples describing the different operations requiring remote control for reactor maintenance are given. These operations include: refueling machines (for closure stud, vessel flange cleaning, screwing plug for channel head, swimming pool decontamination) in-service inspection machines (MIS, spider for eddy current testing of steam generator, television) and routine or accidental maintenance (leak detection in water boxes, maintenance spider, opening or closing primary manways, decontamination manipulators and various automatic control devices) [fr

  1. Remote maintenance of Compact Ignition Tokamak ex-vessel systems

    International Nuclear Information System (INIS)

    DePew, R.E.; Macdonald, D.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel in the Compact Ignition Tokamak (CIT) will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion device's auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. Throughout the CIT remote maintenance (RM) studies conducted to date, computer modeling has been used extensively to investigate manipulator access in these complex, tightly packed, and cluttered surroundings. A recent refinement of computer modeling involves the use of an intelligent engineering work station for realtime interactive display of task simulations. This paper discusses the use of three-dimensional (3-D) kinematic computer models of the CIT machines that are proving to be powerful tools in our efforts to evaluate RM requirements. This presentation includes a video-taped simulation of remote replacement of a plasma viewing assembly. The simulation illustrates some of the constraints associated with typical RM activities and the ways in which computer modeling enhances the design process. 1 ref., 3 figs

  2. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  3. Development of remote maintenance technology for nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Kawahara, Akira; Saito, Masayuki; Kawamura, Hironobu; Yamade, Atsushi; Sugiyama, Sen; Sugiyama, Sakae.

    1986-01-01

    In the plants for reprocessing spent nuclear fuel containing fission products, due to the facts that the facilities are in high radiations fields, and the surfaces of equipments are contaminated with radioactive substances, the troubles of process equipments are directly connected to the remarkable drop of the rate of operation of the facilities. Therefore, the development of various remote maintenance techniques has been carried out so far, but this time, Hitachi Ltd. got a chance to take part in the repair of spent fuel dissolving tanks in the Tokai Reprocessing Plant of Power Reactor and Nuclear Fuel Development Corp. and the development of several kinds of remote checkup equipment related to the repair work. Especially in the repair of the dissolving tanks, a radiation-withstanding checkup and repair apparatus which has high remote operability taking the conditions of radioactive environment and the restriction of the repaired objects in consideration was required, and a dissolving tank repairing robot composed of six kinds has been developed. The key points of the development were the selective use of high radiation-withstanding parts and materials, small size structure and the realization of full remote operability. The full remote maintenance apparatus of this kind is unique in the world, and applicable to wide fields. (Kako, I.)

  4. TPX in-vessel remote maintenance tooling

    International Nuclear Information System (INIS)

    Rennich, M.J.; Silke, G.W.

    1995-01-01

    The Tokamak Physics Experiment (TPX) has used the lessons learned from successful remote maintenance and remote handling facilities to develop both a concept and philosophy for incorporation of remote design from the earliest phases of the project. Initiation of mockup testing during the conceptual design phase leads to significant improvements in the basic maintenance equipment configuration. In addition, remote handling features and capabilities have been incorporated into the design of the plasma-facing components (PFCs) as part of the total PFC design effort

  5. Remote maintenance development, July 1975--July 1976

    International Nuclear Information System (INIS)

    Fletcher, R.D.

    1977-04-01

    The results of the second year's efforts on remote handling development and studies for remote maintenance of failure-prone areas of the New Waste Calcining Facility (NWCF) are presented. Test arrangements and results for specific viewing situations and component remote installation and removal in the Remote Maintenance Development Facility (RMDF) and component material evaluations are discussed

  6. Fusion reactor remote maintenance study. Final report

    International Nuclear Information System (INIS)

    Sniderman, M.

    1979-04-01

    An analysis of a major maintenance operation, the remote replacement of a modular sector of a tokamak reactor, was performed in substantial detail. Specific assumptions were developed which included concepts from various existing designs so that the operation which was studied includes some design features generic to any fusion reactor design. Based on the work performed in this study, the principal conclusions are: (1) It appears feasible to design a tokamak fusion reactor plant with availability comparable to existing fossil and fission plants, but this will require diligence and comprehensive planning during the complete design phase. (2) Since the total fusion program is paced by the success of each device, maintenance considerations must be incorporated into each device during design, even if the device is an experimental unit. (3) Innovative approaches, such as automatic computer controlled operations, should be developed so that large step reductions in planned maintenance times can be achieved

  7. The European contribution to the ITER Remote Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Damiani, C., E-mail: carlo.damiani@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Annino, C.; Balagué, S.; Bates, P.; Ceccanti, F.; Di Mascio, T.; Dubus, G.; Esqué, S.; Gonzalez, C.; Lewczanin, M.; Locke, D.; Mont, L.; Olajos, K.; Ranz, R.; Shuff, R.; Puiu, A.; Van Hille, C.; Van Uffelen, M. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Choi, C.H.; Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); and others

    2014-10-15

    Highlights: •The article introduces the needs for remote maintenance in ITER. •It also discusses some of the issues related to the cultural transition from tokamaks as plasma physics to nuclear reactors. •It highlights the related cultural change and the implications on plant topology and maintenance. •Then, it presents those remote handling systems that will be procured by Europe. •The article emphasises the need of a major involvement of industries from now on. -- Abstract: For a first-of-a-kind nuclear fusion reactor like ITER, remote maintainability of neutron-activated components is one of the key aspects of plant design and operations, and a fundamental ingredient for the demonstration of long-term viability of fusion as energy source. The European Domestic Agency (EU DA, i.e. Fusion for Energy, F4E) is providing important support to the ITER Organisation (IO) in specifying the functional requirements of the Remote Handling (RH) Procurement Packages (i.e. the subsystems allocated to EU DA belonging to the overall ITER Remote Maintenance Systems IRMS), and in performing design and R and D activities – with the support of national laboratories and industries – in order to define a sound concept for these packages. Furthermore, domestic industries are being involved in the subsequent detailed design, validation, manufacturing and installation activities, in order to actually fulfil our procurement-in-kind obligations. After an introduction to ITER Remote Maintenance, this paper will present status and next stages for the RH systems allocated to EU DA, and will also illustrate complementary aspects related to cross cutting technologies like radiation tolerant components and RH control systems. Finally, the way all these efforts are coordinated will be presented together with the overall implementation scenario and key milestones.

  8. The ITER Remote Maintenance Management System

    International Nuclear Information System (INIS)

    Tesini, Alessandro; Rolfe, A.C.

    2009-01-01

    A major challenge for the ITER project is to develop and implement a Remote Maintenance System, which can deliver high Tokamak availability within the constraints of the overall ITER programme objectives. Much of the maintenance of ITER will be performed using remote handling methods and some with combined manual and remote activities working together. The organization and management of the ITER remote handling facilities will be of a scale unlike any other remote handling application in the world. The ITER remote handling design and procurement activities will require co-ordination and management across many different sites throughout the world. It will be a major challenge for the ITER project to ensure a consistent quality and technical approach in all of the contributing parties. To address this issue the IO remote handling team are implementing the ITER Maintenance Management Plan (IMMP) comprising an overarching document defining the policies and methodologies (ITER Remote Maintenance Management System or IMMS) and an associated ITER remote handling code of practise (IRHCOP). The IMMS will be in document form available as a pdf file or similar. The IRHCOP will be implemented as a web based application and will provide access to the central resource of the entire code of practise from any location in the world. The IRHCOP data library will be centrally controlled in order that users can be assured of the data relevance and authenticity. This paper will describe the overall approach being taken to deal with this challenge and go on to detail the structure and content of both the IMMS and the IRHCOP.

  9. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  10. Remote maintenance design activities and research and development accomplishments for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1988-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (rf) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance activities internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For activities external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radiation-waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. 5 figs

  11. Facility operations transparency and remote monitoring

    International Nuclear Information System (INIS)

    Beddingfield, David

    2006-01-01

    Remote monitoring technologies offer many opportunities, not only to strengthen IAEA safeguards, but also to improve national, industrial and local oversight of various nuclear operations. Remote monitoring benefits in greater timeliness, reduced inspector presence and improved state-of-health awareness are well-known attributes. However, there is also the capability to organize data into a comprehensive knowledge of the 'normal operating envelope' of a facility. In considering future applications of remote monitoring there is also a need to develop a better understanding of the potential cost-savings versus higher up-front costs and potential long-term maintenance or upgrade costs. (author)

  12. Remote systems and remote maintenance of a reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Funaya, T.

    1977-01-01

    The design concept and overall maintenance philosophy applied in the Power Reactor and Nuclear Fuel Development Corporation Reprocessing Plant at Tokai-mura, Japan, are briefly introduced. Details on remote systems and remote maintenance in mechanical processing areas are described

  13. Potential applications of advanced remote handling and maintenance technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future US nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two Federal Waste Management System major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment

  14. Potential applications of advanced remote handling and maintenance technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future U.S. nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two Federal Waste Management System major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment

  15. Guidelines for Remote Handling Maintenance of ITER Neutral Beam Components

    International Nuclear Information System (INIS)

    Cordier, J.-J.; Hemsworth, R.; Bayetti, P.

    2006-01-01

    Remote handling maintenance of ITER components is one of the main challenges of the ITER project. This type of maintenance shall be operational for the nuclear phase of exploitation of ITER, and be considered at a very early stage since it significantly impacts on the components design, interfaces management and integration business. A large part of the R/H equipment will be procured by the EU partner, in particular the whole Neutral Beam Remote Handling (RH) equipment package. A great deal of work has already been done in this field during the EDA phase of ITER project, but improvements and alternative option that are now proposed by ITER lead to added RH and maintenance engineering studies. The Neutral Beam Heating -and- Current Drive system 1 is being revisited by the ITER project. The vertical maintenance scheme that is presently considered by ITER, may significantly impact on the reference design of the Neutral Beam (NB) system and associated components and lead to new design of the NB box itself. In addition, revision of both NB cell radiation level zoning and remote handling classification of the beam line injector will also significantly impact on components design and maintenance. Based on the experience gained on the vertical maintenance scheme, developed in detail for the ITER Neutral Beam Test Facility 2 to be built in Europe in a near future, guidelines for the revision of the design and preliminary feasibility study of the remote handling vertical maintenance scheme of beam line components are described in the paper. A maintenance option for the SINGAP3 accelerator is also presented. (author)

  16. Remote maintenance system technology development for nuclear fuel cycle plants

    International Nuclear Information System (INIS)

    Kashihara, Hidechiyo

    1984-01-01

    The necessity of establishing the technology of remote maintenance, the kinds of maintenance techniques and the change, the image of a facility adopting remote maintenance canyon process, and the outline of the R and D plan to put remote maintenance canyon process in practical use are described. As the objects of development, there are twin arm type servo manipulator system, rack system, remote tube connectors, solution sampling system, inspection system for in-cell equipment, and large plugs for wall penetration. The outline of those are also reported. The development of new remote maintenance technology has been forwarded in the Tokai Works aiming at the application to a glass solidification pilot plant and a FBR fuel recycling test facility. The lowering of the rate of utilization of cells due to poor accessibility and the increase of radiation exposure of workers must be overcome to realize nuclear fuel cycle technology. The maintenance technology is classified into crane canyon method, direct maintenance cell method, remote maintenance cell method and remote maintenance canyon method, and those are described briefly. The development plan of remote maintenance technology is outlined. (Kako, I.)

  17. Remote maintenance considerations for swimming pool tokamak reactor

    International Nuclear Information System (INIS)

    Niikura, S.; Yamada, M.; Kasai, M.

    1983-01-01

    Swimming Pool Tokamak Reactor (SPTR) is one of the candidate devices which are expected to demonstrate physical and engineering feasibility for fusion power reactors. In SPTR, water shield is adopted instead of solid shield structures. Among the advantages of SPTR are, from viewpoint of remote maintenance, small handling weight and high space availability between TF coils and a vacuum vessel. On the other hand, high dose rate during reactor repair and adverse effects on remote maintenance equipment by the shielding water might be the disadvantage of SPTR, where it is assumed that the shielding water is drained during reactor repair. Since the design of SPTR is still at the preliminary stage, for remote maintenance, much effort has been directed to clarification of design conditions such as environment and handling weight. As for the remote maintenance system concepts, studies have been focussed on those for a vacuum vessel and its internal structure (blanket, divertor and protection walls) expected to be repaired more frequently. The vacuum vessel assembly is divided into 21 sectors and number of TF coils is 14. A pair of TF coils are connected with each other by antitorque beams on the whole side surface. Vacuum vessel cassettes and associated blanket, divertor and protection walls are replaced through seven windows between TF coils pairs. Therefore each vacuum vessel cassette is required moving mechanisms in toroidal and radial directions. Options for slide mechanisms are wheels, balls, rollers and water bearings. Options for driving the cassette are self-driving by hydraulic motors and external driving by rack-pinion, wires or specific vehicles. As a result of studies, the moving mechanism with wheels and hydraulic motors has been selected for the reference design, and the system with water bearings and rack-pinion as an alternative. Furthermore typical concepts have been obtained for remote maintenance equipment such as wall-mounted manipulators, tools for

  18. Analysis of remote operating systems for space-based servicing operations, volume 1

    Science.gov (United States)

    1985-01-01

    A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.

  19. Applying principles of Design For Assembly to ITER maintenance operations

    International Nuclear Information System (INIS)

    Heemskerk, Cock; de Baar, Marco; Elzendoorn, Ben; Koning, Jarich; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    In ITER, maintenance operations in the vessel and in the Hot Cell will be largely done by Remote Handling (RH). Remotely performed maintenance actions tend to be more time-costly than actions performed by direct human access. With a human operator in the control loop and adequate situational feedback, a two-armed master slave manipulator system can mimic direct access with dexterous manipulation, tactile feedback and vision. But even then, turnaround times are still very high. Adapting the design for simplified maintenance operations can yield significant time savings. One of the methods known to produce a simpler, more robust design, which is also better suited for handling with robots, is Design For Assembly (DFA). This paper discusses whether and how the principles of DFA can be applied to simplify maintenance operations for ITER. While DFA is normally used with series-production and ITER is a unique product, it is possible to apply the principles of DFA to ITER maintenance operations. Furthermore, DFA's principles can be applied at different abstraction levels. Combining principles of DFA with Virtual Reality leads to new insights and provides additional value.

  20. Simulation for Remote Operation for REX10 Nuclear Reactor

    International Nuclear Information System (INIS)

    Lee, Sim Won; Kim, Dong Su; Na, Man Gyun; Lee, Yoon Joon; Lee, Yeon Gun; Park, Goon Cherl

    2010-01-01

    The newly designed REX10 (Regional Energy Reactor, 10MWth) is an environmentally-friendly and stable small nuclear reactor for a small-scale reactor based Multi-purpose regional energy system. The REX10 has been developed to maintain system safety in order to be placed in densely populated region, island, etc. In addition, it is significantly hard to recruit many operation and maintenance personnel for small power reactors differently from usual commercial reactors because of its remote location and of economic reasons. In order to overcome these constraints, to decrease the operation cost by reducing operation and maintenance personnel, and to increase plant reliability through autonomous plant control, it is needed to design the control system of the small power reactors and to establish its unmanned remote operation system. In this study, the REX10 reactor core thermal power controller is designed by using a REX10 code analyzer. The remote control facility through man-machine interface (MMI) design and interface between programming languages was established and it was used to verify remote operation of REX10

  1. Remote Maintenance Monitoring System -

    Data.gov (United States)

    Department of Transportation — The Remote Maintenance and Monitoring System (RMMS) is a collection of subsystems that includes telecommunication components, hardware, and software, which serve to...

  2. Rigid hoist articulated grapple system development for enhanced remote maintenance

    International Nuclear Information System (INIS)

    Witham, C.; White, P.; Garin, J.

    1979-01-01

    Remote maintenance and repair within nuclear environments have become more demanding of remote manipulation equipment in the last few years. A deficiency exists in the array of tools available for dexterous operations of loads in the 180-kg range. The development of a manipulation system with enhanced operator controls is discussed. This system is a six-degree-of-freedom manipulator with bilateral servo control. It is to be attached to a mobile support boom in order to operate throughout the nuclear cell. The manipulator is intended to work in conjunction with light duty servomanipulators, overhead crane systems, and through-the-wall mechanical master slaves

  3. In-vessel maintenance remote manipulator system

    International Nuclear Information System (INIS)

    Jimenez, E.

    1978-01-01

    The radiation environment within the Tokamak Fusion Test Reactor (TFTR) vacuum vessel necessitates the development of a Remote Manipulator System (RMS) to perform required periodic inspection and maintenance tasks. The RMS must be able to perform dexterous operations and handle loads that exceed human capabilities. The limited size of the access ports on the TFTR vacuum vessel and the performance profile, defined by the various handling requirements, present unique design constraints. The design approach and formulation of a RMS configuration which satisfies TFTR requirements is presented herein

  4. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  5. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  6. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  7. Potential application of nuclear remote-handling technology to underwater inspection and maintenance

    International Nuclear Information System (INIS)

    Eccleston, M.J.

    1990-01-01

    Examples are given of remote handling equipment developed within the nuclear industry and employing telemanipulative or telerobotic principles. In telerobotics the nuclear industry has been following a trend towards increased levels of autonomy, delegating operator control to a computer, for example, in resolved rate manipulator tip control, teach-and-repeat control and collision avoidance. Illustrations are presented of remote-handling techniques from the nuclear industry which may be carried over into undersea remote inspection, maintenance and repair systems. (author)

  8. Remote maintenance challenges presented in the ITER engineering design

    International Nuclear Information System (INIS)

    Burgess, T.W.; Herndon, J.N.; Schrock, S.L.; Lousteau, D.C.

    1995-01-01

    Leading fusion energy research institutions are currently engaged in the Engineering Design Activity for the International Thermonuclear Experimental Reactor (ITER). A tokamak reactor design is evolving which emphasizes high system performance in a minimum overall reactor and building size. The resulting high component density dictates careful attention to ITER remote maintenance considerations in the development of the configuration. The complexity and scale of ITER remote maintenance tasks are well beyond the scope of today's experience and technology. This paper discusses the remote maintenance philosophy, describes the basic configuration as it relates to maintenance, and describes the basic procedures and equipment required. Key enabling technology research and development needs are also addressed

  9. Control room concept for remote maintenance in high radiation areas

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    This paper summarizes the design of a control room concept for an operator interface with remote maintenance equipment consisting of force-reflecting manipulators, tools, hoists, cranes, cameras, and lights. The design development involved two major activities. First, detailed requirements were defined for foreseeable functions that will be performed by the control room operators. Second, concepts were developed, tested, and refined to meet these requirements. 6 references, 3 figures

  10. Evaluation of remote maintenance schemes by plasma equilibrium analysis in Tokamak DEMO reactor

    International Nuclear Information System (INIS)

    Utoh, Hiroyasu; Tobita, Kenji; Asakura, Nobuyuki; Sakamoto, Yoshiteru

    2014-01-01

    Highlights: • The remote maintenance schemes in DEMO reactor were evaluated by the plasma equilibrium analysis. • Horizontal sector transport maintenance scheme requires the largest total PF coil current. • The difference of total PF coil current for MHD equilibrium in between the large segmented divertor maintenance and the segmentalized divertor maintenance was about 10%. - Abstract: The remote maintenance schemes in a DEMO reactor are categorized by insertion direction, blanket segmentation, and divertor maintenance scheme, and are quantitatively evaluated by analysing the plasma equilibrium. The positions of the poloidal field (PF) coil are limited by the size of the toroidal field (TF) coil and the maintenance port layout of each remote maintenance scheme. Because the PF coils are located near the larger TF coil and far from the plasma surface, the horizontal sector transport maintenance scheme requires the largest part of total PF coil current, 25% larger than that required for separated sector transport using vertical maintenance ports with segmented divertor maintenance (SDM). In the unsegmented divertor maintenance (UDM) scheme, the total magnetic stored energy in the PF coils at plasma equilibrium is about 30% larger than that stored in the SDM scheme, but the time required for removal and installation of all the divertor cassettes in the UDM scheme is roughly a third of that required in the SDM scheme because the number of divertor cassettes in the UDM scheme is a third of that in the SDM scheme. From the viewpoint of simple maintenance operations, the merit of the UDM scheme has more merit than the SDM scheme

  11. Development of radiation hardness components for ITER remote maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Obara, Kenjiro; Kakudate, Satoshi; Oka, Kiyoshi; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Yagi, Toshiaki; Morita, Yousuke

    1998-04-01

    In the ITER, in-vessel remote handling is required to assemble and maintain in-vessel components in DT operations. Since in-vessel remote handling systems must operate under intense gamma ray radiation exceeding 30 kGy/h, their components must have sufficiently high radiation hardness to allow maintenance long enough in ITER in-vessel environments. Thus, extensive radiation tests and quality improvement, including optimization of material compositions, have been conducted through the ITER R and D program to develop radiation hardness components that meet radiation doses from 10 to 100 MGy at 10 kGy/h. This paper presents the latest on radiation hardness component development conducted by the Japan Home Team as a contribution to the ITER. The remote handling components tested are categorized for use in robotic or viewing systems, or as common components. Radiation tests have been conducted on commercially available products for screening, on modified products, and on new products to improve the radiation hardness. (author)

  12. Development of radiation hardness components for ITER remote maintenance

    International Nuclear Information System (INIS)

    Obara, Kenjiro; Kakudate, Satoshi; Oka, Kiyoshi; Ito, Akira; Yagi, Toshiaki; Morita, Yousuke

    1998-01-01

    In the ITER, in-vessel remote handling is required to assemble and maintain in-vessel components in DT operations. Since in-vessel remote handling systems must operate under intense gamma ray radiation exceeding 30 kGy/h, their components must have sufficiently high radiation hardness to allow maintenance long enough in ITER in-vessel environments. Thus, extensive radiation tests and quality improvement, including optimization of material compositions, have been conducted through the ITER R and D program to develop radiation hardness components that meet radiation doses from 10 to 100 MGy at 10 kGy/h. This paper presents the latest on radiation hardness component development conducted by the Japan Home Team as a contribution to the ITER. The remote handling components tested are categorized for use in robotic or viewing systems, or as common components. Radiation tests have been conducted on commercially available products for screening, on modified products, and on new products to improve the radiation hardness. (author)

  13. Assessment of remote maintenance technologies and their potential application in the Federal Waste Management System [FWMS

    International Nuclear Information System (INIS)

    Kring, C.T.; Meacham, S.A.; Peishel, F.L.

    1988-10-01

    The 40 plus years of remote operating experience in nuclear facilities are summarized, with emphasis on the evolution and capabilities of the remote systems. Current commercially available systems and major development activities are described. The advanced servomanipulator is described, which represents new remote technology that has been developed for the Department of Energy-Nuclear Energy and that can significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. Also based upon past ORNL experience with remote facilities for reprocessing fuel, the guidelines and concepts that are utilized in the design, fabrication, and remote operation of mechanical process equipment and facilities are outlined. The currently available remote handling systems that can be applied, in various combinations, to large-volume in-cell operations are described, and requirements for waste storage facilities are reviewed. A basic trade-off analysis of these remote systems considering waste plant requirements is given. Justification is given for selecting the overhead crane/servomanipulator-based maintenance concept as the option most desirable for future waste processing plant in-cell maintenance. The Robotics/Remote Handling workshop that was implemented by the Office of Storage and Transportation System during the period that this assessment was being performed, helped focus the remaining time allocated to this effort on the future implementation of an overall program plan using a total systems approach. The concluding recommendation of this assessment is that this Robotics/Remote Handling program plan be developed and implemented as soon as possible. 43 refs., 17 figs., 9 tabs

  14. Assessment of remote maintenance technologies and their potential application in the Federal Waste Management System (FWMS)

    Energy Technology Data Exchange (ETDEWEB)

    Kring, C.T.; Meacham, S.A.; Peishel, F.L.

    1988-10-01

    The 40 plus years of remote operating experience in nuclear facilities are summarized, with emphasis on the evolution and capabilities of the remote systems. Current commercially available systems and major development activities are described. The advanced servomanipulator is described, which represents new remote technology that has been developed for the Department of Energy-Nuclear Energy and that can significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. Also based upon past ORNL experience with remote facilities for reprocessing fuel, the guidelines and concepts that are utilized in the design, fabrication, and remote operation of mechanical process equipment and facilities are outlined. The currently available remote handling systems that can be applied, in various combinations, to large-volume in-cell operations are described, and requirements for waste storage facilities are reviewed. A basic trade-off analysis of these remote systems considering waste plant requirements is given. Justification is given for selecting the overhead crane/servomanipulator-based maintenance concept as the option most desirable for future waste processing plant in-cell maintenance. The Robotics/Remote Handling workshop that was implemented by the Office of Storage and Transportation System during the period that this assessment was being performed, helped focus the remaining time allocated to this effort on the future implementation of an overall program plan using a total systems approach. The concluding recommendation of this assessment is that this Robotics/Remote Handling program plan be developed and implemented as soon as possible. 43 refs., 17 figs., 9 tabs.

  15. Remote tool development at the interim examination and maintenance (IEM) cell

    International Nuclear Information System (INIS)

    Kalk, J.J.

    1986-01-01

    In the interim examination and maintenance (IEM) cell at the Fast Flux Test Facility, radioactive fuel assemblies from the reactor are disassembled remotely for examination. The cell has an argon atmosphere and all of the equipment in the IEM cell must be either removed or worked on in place remotely for maintenance and repair. Equipment is mounted either on the cell walls or on other equipment with remote fasteners. These fasteners are required to be tightened to torque values ranging from 4 to 102 N m, and will be loosened and torqued several times during the lifetime of the cell. The purpose of this paper is to discuss the development philosophy for tools, specifically those relating to remote fasteners used in IEM cell work. The IEM cell fastener tightening system is now a series of wrenches and attachments instead of the one tool originally proposed. This set of tools allows use of relatively inexpensive commercially available equipment to tighten remote fasteners, while giving the cell operators the flexibility to use the tool they fell is best for the job. If the first choice is not available, use of an optional tool is possible with no loss of torque accuracy

  16. Control room concept for remote maintenance in high radiation areas

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    This paper summarizes the design of a control room concept for an operator interface with remote maintenance equipment consisting of force-reflecting manipulators, tools, hoists, cranes, cameras, and lights. The design development involved two major activities. First, detailed requirements were defined for foreseeable functions that will be performed by the control room operators. Second, concepts were developed, tested, and refined to meet these requirements. Each of these activities is summarized below. 6 references, 3 figures

  17. Operating experience with remote handling equipment in a typical hot facility

    International Nuclear Information System (INIS)

    Ravishankar, A.; Balasubramanian, G.R.

    1990-01-01

    Large number of articulated arm manipulators and special purpose remote tools have been used either alone or in combination in a recent campaign of treatment of irradiated J rods of CIRUS for separation of 233 U. These equipments were used for operations such as remote maintenance of centrifuge, centrifugal extractor, direct sampling, assistance for sample conveying operations etc. Paper discusses problems encountered in using articulated arm manipulators of type MAll,AMl and how they were overcome. Problems encountered in use of model-8 manipulator for chopper maintenence in a mockup facility are also highlighted. (author). 4 figs., 1 tab

  18. NET test blanket design and remote maintenance

    International Nuclear Information System (INIS)

    Holloway, C.; Hubert, P.

    1991-01-01

    The NET machine has three horizontal ports reserved for testing tritium breeding blanket designs during the physics phase and possibly five during the technology phase. The design of the ports and test blankets are modular to accept a range of blanket options, provide radiation shielding and allow routine replacement. Radiation levels during replacement or maintenance require that all operations must be carried out remotely. The paper describes the problems overcome in providing a port design which includes attachment to the vacuum vessel with double vacuum seals, an integrated cooled first wall and support guides for the test blanket module. The method selected to remotely replace the test module whilst controlling the spread of contamination is also adressed. The paper concludes that the provisions of a test blanket facility based on the NET machine design is feasible. (orig.)

  19. Deployment and Maintenance of Wave Energy Converters at the Lysekil Research Site: A Comparative Study on the Use of Divers and Remotely-Operated Vehicles

    Directory of Open Access Journals (Sweden)

    Flore Rémouit

    2018-04-01

    Full Text Available Ocean renewable technologies have been rapidly developing over the past years. However, current high installation, operation, maintenance, and decommissioning costs are hindering these offshore technologies to reach a commercialization stage. In this paper we focus on the use of divers and remotely-operated vehicles during the installation and monitoring phase of wave energy converters. Methods and results are based on the wave energy converter system developed by Uppsala University, and our experience in offshore deployments obtained during the past eleven years. The complexity of underwater operations, carried out by either divers or remotely-operated vehicles, is emphasized. Three methods for the deployment of wave energy converters are economically and technically analyzed and compared: one using divers alone, a fully-automated approach using remotely-operated vehicles, and an intermediate approach, involving both divers and underwater vehicles. The monitoring of wave energy converters by robots is also studied, both in terms of costs and technical challenges. The results show that choosing an autonomous deployment method is more advantageous than a diver-assisted method in terms of operational time, but that numerous factors prevent the wide application of robotized operations. Technical solutions are presented to enable the use of remotely-operated vehicles instead of divers in ocean renewable technology operations. Economically, it is more efficient to use divers than autonomous vehicles for the deployment of six or fewer wave energy converters. From seven devices, remotely-operated vehicles become advantageous.

  20. Design and operation of remote maintenance systems in JET

    International Nuclear Information System (INIS)

    Raimondi, T.

    1987-01-01

    The JET tokamak is a joint European project aimed at proving the viability of nuclear fusion as a source of energy. A remote handling system is being developed for this large experimental facility. Force feedback servomanipulators and TV cameras are positioned at work locations by large transporters. Positioning and tele-operation are computer-assisted. Special tools are being devised to facilitate difficult tasks

  1. Hand-eye coordinative remote maintenance in a tokamak vessel

    Energy Technology Data Exchange (ETDEWEB)

    Qiu, Qiang, E-mail: qiu6401@sjtu.edu.cn; Gu, Kai, E-mail: gukai0707@sjtu.edu.cn; Wang, Pengfei, E-mail: wpf790714@163.com; Bai, Weibang, E-mail: 654253204@qq.com; Cao, Qixin, E-mail: qxcao@sjtu.edu.cn

    2016-03-15

    Highlights: • If there is not rotation between the visual coordinate frame (O{sub e}X{sub e}Y{sub e}) and hand coordinate frame (O{sub h}X{sub h}Y{sub h}), a person can coordinate the movement between hand and eye easily. • We establish an alignment between the movement of the operator's hand and the visual scene of the end-effector as displayed on the monitor. • A potential function is set up in a simplified vacuum vessel model to provide a fast collision checking, and the alignment between repulsive force and Omega 7 feedback force is accomplished. • We carry out an experiment to evaluate its performance in a remote handling task. - Abstract: The reliability is vitally important for the remote maintenance in a tokamak vessel. In order to establish a more accurate and safer remote handling system, a hand-eye coordination method and an artificial potential function based collision avoidance method were proposed in this paper. At the end of this paper, these methods were implemented to a bolts tightening maintenance task, which was carried out in our 1/10 scale tokamak model. Experiment results have verified the value of the hand-eye coordination method and the collision avoidance method.

  2. Hand-eye coordinative remote maintenance in a tokamak vessel

    International Nuclear Information System (INIS)

    Qiu, Qiang; Gu, Kai; Wang, Pengfei; Bai, Weibang; Cao, Qixin

    2016-01-01

    Highlights: • If there is not rotation between the visual coordinate frame (O_eX_eY_e) and hand coordinate frame (O_hX_hY_h), a person can coordinate the movement between hand and eye easily. • We establish an alignment between the movement of the operator's hand and the visual scene of the end-effector as displayed on the monitor. • A potential function is set up in a simplified vacuum vessel model to provide a fast collision checking, and the alignment between repulsive force and Omega 7 feedback force is accomplished. • We carry out an experiment to evaluate its performance in a remote handling task. - Abstract: The reliability is vitally important for the remote maintenance in a tokamak vessel. In order to establish a more accurate and safer remote handling system, a hand-eye coordination method and an artificial potential function based collision avoidance method were proposed in this paper. At the end of this paper, these methods were implemented to a bolts tightening maintenance task, which was carried out in our 1/10 scale tokamak model. Experiment results have verified the value of the hand-eye coordination method and the collision avoidance method.

  3. Current status of research and development on remote maintenance for fusion components

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi

    2008-01-01

    There is a growing attention to remote maintenance of nuclear fusion reactors. Remote maintenance is planned in ITER tokamak to keep the health of in-vessel components like blankets and divertors. In this article, current status of the development in the remote maintenance equipments and methods, especially for ITER tokamak are reviewed. The newly developed vehicle type and boom type maintenance devices, manipulator, and transfer cask are illustrated. (J.P.N.)

  4. New design centrifugal contactor remotely controlled for solvent extraction operations for feed clarification

    International Nuclear Information System (INIS)

    Candelieri, T.; Gerardi, A.; Petrigliano, G.; Siepe, V.

    1987-01-01

    The project concept of the nuclear facilities has gone through an important evolution in the past years in relation to the need of: garantiing the remote maintenance reducing workers exposure when operating in high-risk areas; making easier final decommissioning operations of the plants. In this way the ITREC pilot plant (built in 1970s') for its modular characteristic based on Rack Removal System (R.R.S.) was the first example of this new concept of project. A further development, in the field of remote maintenance and decommissioning operations, we can obtain associating to the R.R.S. concept that of projecting the single components (only for the critical ones) remotely demountable in their higher radioactive parts to consent the maintenance-substitution and/or decommissioning operations without interfering with remaining parts of the plant which it is connected. All of this helps in the realization of the aim making better plant operations reducing drastically work time and therefore non-functioning period of the plants. These principles have been applicated in the realization of two important components in reprocessing plant: the centrifugal contactor for solvent extraction and feed clarification centrifuge

  5. Manipulator system for remote maintenance of fusion experimental reactor

    International Nuclear Information System (INIS)

    Shibanuma, Kiyoshi; Munakata, Tadashi; Murakami, Shin; Kondoh, Mitsunori.

    1991-01-01

    We have completed the conceptual design for a rail-mounted vehicle type remote maintenance system for the fusion experimental reactor (FER), which will be the first D-T burning reactor in Japan. We have fabricated a 1/5-scale model and confirmed the feasibility of the design. In this system, a rail is deployed into the vessel and supported at four horizontal ports. A vehicle then moves along the rail and handles in-vessel components with manipulators. The advantages of this concept are the high stiffness and high reliability of the rail, and the high mobility of the vehicle for efficient maintenance operations. In the FER, this concept is considered to be the first option for in-vessel maintenance. This paper describes the conceptual design of the system and the feasibility study using the 1/5-scale model. (author)

  6. Remote-automation of nuclear power plant equipment inspection and maintenance

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi; Kawamura, Hironobu; Nakano, Yoshiyuki; Izumi, Shigeru.

    1984-01-01

    The remotely operated automation of the checkup and maintenance of nuclear power generation facilities has largely contributed to the rise of capacity ratio of plants due to the shortening of regular inspection period and to the reduction of radiation exposure dose during working, the labor saving in working and so on. In this paper, the new technologies adopted in an automatic fuel exchanger, a remotely operated automatic CRD exchanger, a new type channel handling machine, pressure-withstanding main steam line plugs and so on for No.2 plant in the Fukushima No.2 Nuclear Power Station, Tokyo Electric Power Co., Inc., are reported. Besides, the state of development of new remotely operated automatic machines for nuclear power use, such as CRD disassembling and cleaning device, volume reduction equipment for spent fuel channel boxes and control rods, multi-functional robots for use under high radiation and so on is described. Also the trend of development of latest robot technology which will be put in practical use in near future is outlined, such as a running manipulator for checkup and inspection, a variable form crawler vehicle and a five-leg movable manipulator. (Kako, I.)

  7. Maintenance of remote reconnaissance vehicle

    International Nuclear Information System (INIS)

    Schein, D.C.

    1985-01-01

    A description is provided of the maintenance program developed for remote reconnaissance vehicles, such as RRV-1, in use at the Three Mile Island Unit 2. The described approach, which is simple, effective, and flexible, helped to make the effort successful. It will be applied to future projects

  8. Systematic approach to remote maintenance in the fuels and materials examination facility

    International Nuclear Information System (INIS)

    Frandsen, G.B.; Nash, C.R.; Divona, C.J.; May, R.F.

    1979-01-01

    The Fuels and Materials Examination Facility (FMEF) is systematically analyzed from a remote maintenance standpoint using functional analysis methods. From the analysis the remote maintainability of equipment is ascertained, required tooling lists are formed, and maintenance downtimes are established. These techniques identify deficiencies or inefficiencies in the early design stage where changes have a minimum impact on cost. Special tooling and fixture requirements are minimized by standardizing remote maintenance design features

  9. Remote operations in a Fusion Engineering Research Facility (FERF)

    International Nuclear Information System (INIS)

    Doggett, J.N.

    1975-01-01

    The proposed Fusion Engineering Research Facility (FERF) has been designed for the test and evaluation of materials that will be exposed to the hostile radiation environment created by fusion reactors. Because the FERF itself must create a very hostile radiation environment, extensive remote handling procedures will be required as part of its routine operations as well as for both scheduled and unscheduled maintenance. This report analyzes the remote-handling implications of a vertical- rather than horizontal-orientation of the FERF magnet, describes the specific remote-handling facilities of the proposed FERF installation and compares the FERF remote-handling system with several other existing and proposed facilities. (U.S.)

  10. Progress report on the development of remotely operated tools

    International Nuclear Information System (INIS)

    Smith, A.T.

    1984-08-01

    This report contains a number of individual trials reports based upon work conducted in aid of a programme of feasibility studies into the size reduction of radioactive contaminated solid waste. The work was directed towards the identification of acceptable remotely operated tools and the means of deploying them for dismantling operations in a radioactive environment. Reliability, ease of maintenance, change of tool bits and common power sources have been major considerations in the trials assessments. Alternative end effector drive systems have also been considered when defining suitable manipulative capabilities and attention has also been directed towards a remotely controlled tool changing capability. (author)

  11. Design, fabrication, and mockup testing in the remote maintenance development facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility at the Idaho National Engineering Laboratory was installed and used extensively for full-scale development, mockup, and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques, and remote capabilities were proven workable prior to construction. A description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF is presented

  12. Remote maintenance techniques in the furnace cell of a high level waste vitrification plant

    International Nuclear Information System (INIS)

    Selig, M.

    1983-01-01

    Remote controlled maintenance and changing techniques for the furnace of a vitrification plant for radioactive waste was developed and tested on a 1:1 model. The model was fitted out with imitation main components, remote control equipment, lead-ins and the complete tubing so that the trials could be carried out in a manner replicating as closely as possible the situation found under operating conditions. The development of remote-handled tube cable connectors, tube cable jumpers and plugs and sockets was an important aspect of the developmental programme. (orig.) [de

  13. Design, fabrication, and mockup testing in the Remote Maintenance Development Facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility (RMDF) at the Idaho National Engineering Laboratory (INEL) was installed and used extensively for full-scale development, mockup and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques and remote capabilities were proven workable prior to construction. Presented in this paper is a description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF

  14. History of Robotic and Remotely Operated Telescopes

    Science.gov (United States)

    Genet, Russell M.

    2011-03-01

    While automated instrument sequencers were employed on solar eclipse expeditions in the late 1800s, it wasn't until the 1960s that Art Code and associates at Wisconsin used a PDP minicomputer to automate an 8-inch photometric telescope. Although this pioneering project experienced frequent equipment failures and was shut down after a couple of years, it paved the way for the first space telescopes. Reliable microcomputers initiated the modern era of robotic telescopes. Louis Boyd and I applied single board microcomputers with 64K of RAM and floppy disk drives to telescope automation at the Fairborn Observatory, achieving reliable, fully robotic operation in 1983 that has continued uninterrupted for 28 years. In 1985 the Smithsonian Institution provided us with a suburb operating location on Mt. Hopkins in southern Arizona, while the National Science Foundation funded additional telescopes. Remote access to our multiple robotic telescopes at the Fairborn Observatory began in the late 1980s. The Fairborn Observatory, with its 14 fully robotic telescopes and staff of two (one full and one part time) illustrates the potential for low operating and maintenance costs. As the information capacity of the Internet has expanded, observational modes beyond simple differential photometry opened up, bringing us to the current era of real-time remote access to remote observatories and global observatory networks. Although initially confined to smaller telescopes, robotic operation and remote access are spreading to larger telescopes as telescopes from afar becomes the normal mode of operation.

  15. Overview of progress on the European DEMO remote maintenance strategy

    Energy Technology Data Exchange (ETDEWEB)

    Crofts, Oliver, E-mail: oliver.crofts@ccfe.ac.uk [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Loving, Antony; Iglesias, Daniel [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Coleman, Matti [EUROfusion Consortium, PPP& T Department, Boltzmannstraße 2, 85748 Garching (Germany); Siuko, Mikko [VTT Technical Research Centre of Finland, PO Box 1000, FI-02044 VTT, Espoo (Finland); Mittwollen, Martin [KIT Institut für Fördertechnik und Logistiksysteme, Gotthard-Franz-Straße 8, Geb.50.38, 76131 Karlsruhe (Germany); Queral, Vicente [CIEMAT Laboratorio Nacional de Fusión, Edif. 66, Avenida Complutense 40, 28040 Madrid (Spain); Vale, Alberto [IST, Instituto Superior Técnico, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Villedieu, Eric [CEA, IRFM, 13108 St Paul lez Durance (France)

    2016-11-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  16. Overview of progress on the European DEMO remote maintenance strategy

    International Nuclear Information System (INIS)

    Crofts, Oliver; Loving, Antony; Iglesias, Daniel; Coleman, Matti; Siuko, Mikko; Mittwollen, Martin; Queral, Vicente; Vale, Alberto; Villedieu, Eric

    2016-01-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  17. Telemanipulation - a special activity in remotely controlled operations

    International Nuclear Information System (INIS)

    Rose, K.W.; Andre, Y.

    1992-01-01

    Work to be done in areas hostile to humans needs special and careful preparation. If short-term entry is possible, groups of men can be trained to do the necessary work. If not, special devices have to be designed, built, and tested on mockups before the real work can be executed. Based on experience gained from maintenance in car production and test programs for a reprocessing facility, it was decided to train a special group of men to do remotely controlled work in hostile areas without endangering them and to use their personal experience as the basis for future work. This is the old-fashioned way of all professions. Some needs to be able to do that remotely controlled work with normally existing operational means and combinations of them like cranes, mechanical and electromechanical master slave manipulators (MMSMs and EMSMs), saws, files, hammer, tig-welding equipment, etc., in air as well as underwater. This paper discusses use of a remote operator manipulator (ROM), remote operator welder (ROW), a test of underwater work, and the repair of two activated jets pumps of a boiling water reactor BWR with a fueling machine, reactor crane, EMSM, and conventional tools

  18. Prevalence of operator fatigue in winter maintenance operations.

    Science.gov (United States)

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  19. Development of a Remote Handling Robot for the Maintenance of an ITER-Like D-Shaped Vessel

    Directory of Open Access Journals (Sweden)

    Peihua Chen

    2014-01-01

    Full Text Available Robotic operation is one of the major challenges in the remote maintenance of ITER vacuum vessel (VV and future fusion reactors as inner operations of Tokamak have to be done by robots due to the internal adverse conditions. This paper introduces a novel remote handling robot (RHR for the maintenance of ITER-like D-shaped vessel. The modular designed RHR, which is an important part of the remote handling system for ITER, consists of three parts: an omnidirectional transfer vehicle (OTV, a planar articulated arm (PAA, and an articulated teleoperated manipulator (ATM. The task of RHR is to carry processing tools, such as the viewing system, leakage detector, and electric screwdriver, to inspect and maintain the components installed inside the D-shaped vessel. The kinematics of the OTV, as well as the kinematic analyses of the PAA and ATM, is studied in this paper. Because of its special length and heavy payload, the dynamics of the PAA is also investigated through a dynamic simulation system based on robot technology middleware (RTM. The results of the path planning, workspace simulations, and dynamic simulation indicate that the RHR has good mobility together with satisfying kinematic and dynamic performances and can well accomplish its maintenance tasks in the ITER-like D-shaped vessel.

  20. INEL experience and capabilities in design, operation, and maintenance of nuclear systems

    International Nuclear Information System (INIS)

    Leatham, J.; Masson, L.S.

    1982-07-01

    This study provides an overview of the experience, hardware, and managerial expertise available at the INEL for design, fabrication, and operation of tools and facilities for remote maintenance. The survey demonstrates that the INEL's fission reactor experience is directly applicable to the design of remote handling hardware which must be developed for fusion reactors, and that the experience and facilities are available at INEL to begin that work

  1. Status Report of the Inter-Laboratory Task Force on Remote Operation

    International Nuclear Information System (INIS)

    Phinney, Nan

    2001-01-01

    The next generation of particle accelerators will be major projects which may require a new mode of international and inter-laboratory collaboration. They are likely to be too costly to be funded by a single nation and too large to be built by a single laboratory. The tremendous technical challenge of a new facility requires a critical mass of highly qualified and experienced physicists and engineers. These experts are presently distributed among the major accelerator centers around the world and it is believed important to maintain and develop this broad base of expertise. The successful accelerator technology development of recent decades depended on extensive exchange of people with complementary technical skills. Therefore, it is desirable and probably necessary that several accelerator laboratories will participate in any future project. A consequence of a multi-laboratory project is that the accelerator will be located a considerable distance from most of the contributing institutions which design, build and operate it. These considerations led the International Committee for Future Accelerators to initiate a study on the general and technical implications of such a collaboration. Two task forces were formed in February 2000 to conduct this study and they were asked to prepare a report on a time scale of one year. The task force on Remote Operation included members from most of the major accelerator laboratories around the world with expertise on accelerator operation, controls software, communication technologies, hardware design and maintenance. The task force members gathered information from the experts at their own institutions and from available experience in other fields, particularly astronomy. The task force on Remote Operations began by developing a model for an international multi-laboratory collaboration to construct and operate an accelerator facility. This model is described in section 3. While it is clear that there are numerous alternative

  2. The divertor remote maintenance project

    International Nuclear Information System (INIS)

    Maisonnier, D.; Martin, E.; Akou, K.

    2001-01-01

    Remote replacement of the ITER divertor will be required several times during the life of ITER. To facilitate its regular exchange, the divertor is assembled in the ITER vacuum vessel from 60 cassettes. Radial movers transport each cassette along radial rails through the handling ports and into the vessel where a toroidal mover lifts and transports the cassette around a pair of toroidal rails. Once at its final position the cassette is locked to the toroidal rails and is accurately aligned in both poloidal and toroidal directions. A further requirement on the divertor is to minimise the amount of activated waste to be sent to a repository. To this end the cassettes have been designed to allow the remote replacement, in a hot cell, of their plasma facing components. The paper describes the two facilities built at ENEA Brasimone, Italy, whose aim is to demonstrate the reliable remote maintenance of the divertor cassettes. (author)

  3. The divertor remote maintenance project

    International Nuclear Information System (INIS)

    Maisonnier, D.; Martin, E.; Akou, K.

    1999-01-01

    Remote replacement of the ITER divertor will be required several times during the life of ITER. To facilitate its regular exchange, the divertor is assembled in the ITER vacuum vessel from 60 cassettes. Radial movers transport each cassette along radial rails through the handling ports and into the vessel where a toroidal mover lifts and transports the cassette around a pair of toroidal rails. Once at its final position the cassette is locked to the toroidal rails and is accurately aligned in both poloidal and toroidal directions. A further requirement on the divertor is to minimise the amount of activated waste to be sent to a repository. To this end the cassettes have been designed to allow the remote replacement, in a hot cell, of their plasma facing components. The paper describes the two facilities built at ENEA Brasimone, Italy, whose aim is to demonstrate the reliable remote maintenance of the divertor cassettes. (author)

  4. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  5. Remote manipulation techniques in the maintenance and repair of nuclear power plants

    International Nuclear Information System (INIS)

    Rininsland, H.; Boehme, G.

    1986-01-01

    Remote manipulation means the application of multi-purpose devices featuring high mobility and universal applicability. The paper describes such a remote manipulation system (manipulation vehicle MF1 and MF2, master-slave manipulator, TFTR maintenance manipulator) which can be used flexibly in the NNP during maintenance and repair and in incident and accident situations. Connecting elements and tools can be redesigned for remote manipulation to meet the specific application environments. (DG) [de

  6. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  7. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    International Nuclear Information System (INIS)

    Phinney, Nan

    2001-01-01

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, trouble shooting and repair. Experience from existing accelerators confirms that most of these activities are already performed remotely. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems

  8. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    Energy Technology Data Exchange (ETDEWEB)

    Phinney, Nan

    2001-12-07

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, troubleshooting and repair. Experience from existing accelerators confirms that most of these activities are already performed 'remotely'. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems.

  9. Integration of remotely operated manipulator systems for the nuclear industry

    International Nuclear Information System (INIS)

    Blight, J.; Cornec, G.

    2003-01-01

    There is no getting away from remotely operated manipulator systems in significant part in dismantling operations, because of the actual radioactive emitting level of installations. However, some main contractors, who have been involved in dismantling projects in the past few years are reluctant to use remotely operated systems because: - equipment characteristics are not suitable for the environment and the work to be performed; - There are some design problems; - Main components do not withstand operation any longer, after some time; - There are deficiencies in the management of quality, for critical equipment problems that degrade the productivity and increase direct and indirect labour cost. As a summary therefore, equipment available on this dismantling market are reputedly unreliable and not 'industrial' (sturdy) enough. However, numerous operations in maintenance in primary loops of nuclear reactors, or in the Offshore sector, are carried out remotely, to the satisfaction of the operators and the investors. In the dismantling sector, a thorough analysis of the difficulties encountered indicates that their origin is mostly due to a lack of methodology - that needs to be addressed -, rather than a technical problem. In that context, CYBERNETIX proposes to be involved in phases upstream and downstream of the equipment supply's. Upstream: Participate in developing/validating the scenarios to be used to optimise the constraints of remote operations/equipment. Downstream: Participate actively in supporting the client on-site, ensuring that equipment are available and maintained by competent and motivated people, and thus, getting experience in order to improve the State-of-the-Art of robotic in that field. Then, the contracting authority and CYBERNETIX jointly define the limits and the content of the involvement of each party, and also define the most appropriate type of 'partnership' between the main contactor and the participating companies, and in order to

  10. Analysis of human-in-the-loop tele-operated maintenance inspection tasks using VR

    International Nuclear Information System (INIS)

    Boessenkool, H.; Abbink, D.A.; Heemskerk, C.J.M.; Steinbuch, M.; Baar, M.R. de; Wildenbeest, J.G.W.; Ronden, D.; Koning, J.F.

    2013-01-01

    Highlights: ► Execution of tele-operated inspection tasks for ITER maintenance was analyzed. ► Human factors experiments using Virtual Reality showed to be a valuable approach. ► A large variation in time performance and number of collisions was found. ► Results indicate significant room for improvement for teleoperated free space tasks. ► A promising solution is haptic shared control: assist operator with guiding forces. -- Abstract: One of the challenges in future fusion plants such as ITER is the remote maintenance of the plant. Foreseen human-in-the-loop tele-operation is characterized by limited visual and haptic feedback from the environment, which results in degraded task performance and increased operator workload. For improved tele-operated task performance it is required to get insight in the expected tasks and problems during maintenance at ITER. By means of an exploratory human factor experiment, this paper analyses problems and bottlenecks during the execution of foreseen tele-operated maintenance at ITER, identifying most promising areas of improvement. The focus of this paper is on free space (sub)tasks where contact with the environment needs to be avoided. A group of 5 subjects was asked to carry-out an ITER related free space task (visual inspection), using a six degree of freedom master device connected to a simulated hot cell environment. The results show large variation in time performance between subjects and an increasing number of collisions for more difficult tasks, indicating room for improvement for free space (sub)tasks. The results will be used in future research on the haptic guidance strategies in the ITER Remote Handling framework

  11. Analysis of human-in-the-loop tele-operated maintenance inspection tasks using VR

    Energy Technology Data Exchange (ETDEWEB)

    Boessenkool, H., E-mail: h.boessenkool@differ.nl [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Abbink, D.A. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Steinbuch, M. [Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Baar, M.R. de [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Eindhoven University of Technology, Department of Mechanical Engineering, Dynamics and Control Group, PO Box 513, 5600 MB Eindhoven (Netherlands); Wildenbeest, J.G.W. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Ronden, D. [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Koning, J.F. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands)

    2013-10-15

    Highlights: ► Execution of tele-operated inspection tasks for ITER maintenance was analyzed. ► Human factors experiments using Virtual Reality showed to be a valuable approach. ► A large variation in time performance and number of collisions was found. ► Results indicate significant room for improvement for teleoperated free space tasks. ► A promising solution is haptic shared control: assist operator with guiding forces. -- Abstract: One of the challenges in future fusion plants such as ITER is the remote maintenance of the plant. Foreseen human-in-the-loop tele-operation is characterized by limited visual and haptic feedback from the environment, which results in degraded task performance and increased operator workload. For improved tele-operated task performance it is required to get insight in the expected tasks and problems during maintenance at ITER. By means of an exploratory human factor experiment, this paper analyses problems and bottlenecks during the execution of foreseen tele-operated maintenance at ITER, identifying most promising areas of improvement. The focus of this paper is on free space (sub)tasks where contact with the environment needs to be avoided. A group of 5 subjects was asked to carry-out an ITER related free space task (visual inspection), using a six degree of freedom master device connected to a simulated hot cell environment. The results show large variation in time performance between subjects and an increasing number of collisions for more difficult tasks, indicating room for improvement for free space (sub)tasks. The results will be used in future research on the haptic guidance strategies in the ITER Remote Handling framework.

  12. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Tabor, M.A.

    1988-01-01

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  13. Highly active vitrification plant remote handling operational experience and improvements

    International Nuclear Information System (INIS)

    Milgate, I.

    1996-01-01

    All the main process plant and equipment at the Sellafield Waste Vitrification Plant (WVP) is enclosed in heavily shielded concrete walled cells. There is a large quantity of relatively complex plant and equipment which must be remotely operated, maintained or replaced in-cell in a severe environment. The WVP has five in-cell polar cranes which are of modular construction to aid replacement of failed components. Each can be withdrawn into a shielded cell extension for decontamination and hands-on maintenance. The cells have a total of 80 through wall tube positions to receive Master Slave Manipulators (MSMs). The MSMs are used where possible for ''pick and place'' purposes but are often called upon to position substantial pieces of mechanical equipment and thus are subject to heavy loading and high failure rates. An inward flow of air is maintained in the active cells. The discharged air passes through a filter cell where remote damper operation filter changing and maintenance is carried out by means of a PAR3000 manipulator. A Nuclear Engineered Advanced Teleoperated Robot (Neater) swabs the vitrified product container to ensure cleanliness before storage. There is a significant arising of solid radioactive waste from replaced in-cell items which undergoes sorting and size reduction in a breakdown cell equipped with a large reciprocating saw and a hydraulic shear. Improvements to the remote handling facilities made in the light of operational experience are described. (UK)

  14. An operator training simulator based on interactive virtual teleoperation: nuclear facilities maintenance applications

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Kim, Seung Ho

    1997-01-01

    Remote manipulation in nuclear hazardous environment is very often complex and difficult to operate and requires excessively careful preparation. Remote slave manipulators for unstructured work are manually controlled by a human operator. Small errors made by the operator via the master manipulator during operation can cause the slave to be surffered from excessive forces and result in considerable damages to the slave iteself and its environment. In this paper, we present a prototype of an operator training simulator for use in nuclear facilities maintenance applications, as part of the ongoing Nuclear Robotics Development Program at Korea Atomic Energy Research Institute (KAERI). The operator training simulator provides a means by which, in virtual task simulation, the operator can try out and train for expected remote tasks that the real slave manipulator will perform in advance. The operator interacts with both the virtual slave and task environment through the real master. Virtual interaction force feedback is provided to the operator. We also describe a man-in-the loop control scheme to realize bilateral force reflection in virtual teleoperation

  15. Synthetic viewing: comprehensive work representation, making remote work clearer to the operator

    International Nuclear Information System (INIS)

    Leinemann, K.; Katz, F.; Knueppel, H.; Olbrich, W.; Maisonnier, D.

    1995-01-01

    Maintenance work in fusion plants such as the ITER plant will be carried out fully remotely, without any direct view on to the work scene. The basic sources of information about the state of the work are video monitors. In a first development step, this viewing channel was enhanced by three-dimensional computer graphics controlled by signals of motion sensors (such as joint angle sensors) of the real maintenance devices. However, experience has shown that more information is required about the status of all pieces of equipment involved and about the status of the entire handling task, if the work is to be done properly. Viewing for remote handling applications needs to include the display of such status information in a suitable form. Of special importance in this sense is the representation of the work procedures on the computer display, enabling the operator to grasp at a glance the actual state of the work and the details about the subtask to be executed next. The tool providing this ''synthetic'' viewing but also task-suited to planning, training and controlling support for the operator is the remote handling workstation. The prototype of a remote handling workstation was successfully used in the first complete Karlsruhe experiment for in-torus handling. (orig.)

  16. Remote tool development for nuclear dismantling operations

    International Nuclear Information System (INIS)

    Craig, G.; Ferlay, J.C.; Ieracitano, F.

    2003-01-01

    Remote tool systems to undertake nuclear dismantling operations require careful design and development not only to perform their given duty but to perform it safely within the constraints imposed by harsh environmental conditions. Framatome ANP NUCLEAR SERVICES has for a long time developed and qualified equipment to undertake specific maintenance operations of nuclear reactors. The tool development methodology from this activity has since been adapted to resolve some very challenging reactor dismantling operations which are demonstrated in this paper. Each nuclear decommissioning project is a unique case, technical characterisation data is generally incomplete. The development of the dismantling methodology and associated equipment is by and large an iterative process combining design and simulation with feasibility and validation testing. The first stage of the development process involves feasibility testing of industrial tools and examining adaptations necessary to control and deploy the tool remotely with respect to the chosen methodology and environmental constraints. This results in a prototype tool and deployment system to validate the basic process. The second stage involves detailed design which integrates any remaining technical and environmental constraints. At the end of this stage, tools and deployment systems, operators and operating procedures are qualified on full scale mock ups. (authors)

  17. Remote maintenance of a combined regeneration-isolation valve for the ITER Torus vacuum pumping system

    International Nuclear Information System (INIS)

    Stringer, J.; Blevins, J.

    1992-01-01

    A large diameter valve suitable for high vacuum operation is under study for ITER Torus evacuation. The valves must comply with specifications for leak-tightness, radiation resistance, dust tolerance, overpressure, and thermal gradients. Remote maintenance of the seal and valve moving parts without disturbance to the rest of the valve system is a requirement. This paper describes tow methods of seal exchange by remote means. In the first method, a flask is proposed for the valve moving parts exchange in inert gas, when the machine is shut down. In the second method a novel concept is described for seal exchange while under vacuum, without having to bring the machine up to atmosphere. The advantages of this method are that scheduled remote handling (RH) operations and outages for seal replacement are not required. Also, the need for a flask is avoided

  18. Analysis of the ITER ECH Upper Port Launcher remote maintenance using virtual reality

    NARCIS (Netherlands)

    Elzendoorn, B.; Baar, M. de; Chavan, R.; Goodman, T.; Heemskerk, C.; Heidinger, R.; Kleefeldt, K.; Koning, J.; Sanders, S.; Späh, P.; Strauss, D.; Verhoeven, T.; Vreede, F. de

    2009-01-01

    All ITER sub-systems of remote handling (RH) classes 1 and 2 have to be remotely maintainable. The maintenance strategy for these components has to ensure system availability after failure or scheduled maintenance. This paper shows how virtual reality (VR) simulation [1] can be used as a tool to

  19. Extending Virtual Reality simulation of ITER maintenance operations with dynamic effects

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Baar, M.R. de; Boessenkool, H.; Graafland, B.; Haye, M.J.; Koning, J.F.; Vahedi, M.; Visser, M.

    2011-01-01

    Virtual Reality (VR) simulation can be used to study, improve and verify ITER maintenance operations during preparation. VR can also improve the situational awareness of human operators during actual Remote Handling (RH) operations. Until now, VR systems use geometric models of the environment and the objects being handled and kinematic models of the manipulation systems. The addition of dynamic effects into the VR simulation was investigated. Important dynamic effects are forces due to contact transitions and the bending of beams under heavy loads. A novel dynamics simulation module was developed and introduced as an add-on to the VR4Robots VR software. Tests were performed under simplified test conditions and in the context of realistic ITER maintenance tasks on a benchmark product and on the ECRH Upper Port Launcher Plug (UPL). The introduction of dynamic effects into VR simulations was found to add realism and provide new insights in procedure development. The quality of the haptic feedback depends strongly on the haptic device used to 'display' haptic feedback to the operator. Dynamic effect simulation can also form the basis for real-time guidance support to operators during the execution of maintenance tasks (augmented reality).

  20. Remote handling at LAMPF

    International Nuclear Information System (INIS)

    Grisham, D.L.; Lambert, J.E.

    1983-01-01

    Experimental area A at the Clinton P. Anderson Meson Physics Facility (LAMPF) encompasses a large area. Presently there are four experimental target cells along the main proton beam line that have become highly radioactive, thus dictating that all maintenance be performed remotely. The Monitor remote handling system was developed to perform in situ maintenance at any location within area A. Due to the complexity of experimental systems and confined space, conventional remote handling methods based upon hot cell and/or hot bay concepts are not workable. Contrary to conventional remote handling which require special tooling for each specifically planned operation, the Monitor concept is aimed at providing a totally flexible system capable of remotely performing general mechanical and electrical maintenance operations using standard tools. The Monitor system is described

  1. Automatic and manual operation modes of the TFTR maintenance manipulator

    International Nuclear Information System (INIS)

    Boehme, G.; Gumb, L.; Lotz, E.; Mueller, G.; Selig, M.

    1987-01-01

    The remote in-vessel operations scheduled to maintain the TFTR at Princeton, NJ, USA, comprise inspection, calibration, cleaning and protective tile replacement. The environmental conditions inside the torus vessel are ultra high vacuum, moderate γ-radiation and 150 0 C temperature of the vessel structure. The Princeton Plasma Physics Laboratory (PPPL) and KfK are jointly developing a maintenance manipulator (MM) which can perform these tasks. (orig./HP)

  2. Development of radiation-hard electric connector with ball bearing for in-vessel remote maintenance equipment of ITER

    International Nuclear Information System (INIS)

    Ito, Akira; Obara, Kenjiro; Tada, Eisuke; Morita, Yousuke; Yagi, Toshiaki; Iida, Kazuhisa; Sato, Masaru.

    1997-12-01

    Development of radiation-hard electric connector with ball bearing for in-vessel remote maintenance equipment of ITER (International Thermonuclear Experimental Reactor) has been conducted. Since the in-vessel remote maintenance equipment is operated under the condition of 10 6 R/h gamma ray dose rate, the electric connector has to be radiation hard for an accumulation dose of 10 10 R. In addition, the simple attachment/removal mechanism is essential for remote operation. For this, the alumina (Al203) ceramics and a ball bearing were adopted to electric insulator and plug (male) of connector, respectively. The handling tests on attachment/removal of the connector were conducted by using master slave manipulator and general purpose robot with handling tool, and as a result, the validity of the attachment/removal mechanism was verified. In the gamma ray irradiation tests, which are under way, no degradation in break down voltage (1000V 1min.) up to 10 10 R was confirmed. However insulation resistance and contact resistance between contact pin and contact socket were deteriorated in proportion to the accumulation dose. Increase of contact resistance is considered due to an erosion of contact pin. (author)

  3. Remote maintenance demonstration tests at a pilot plant for high level waste vitrification

    International Nuclear Information System (INIS)

    Selig, M.

    1984-01-01

    The remote maintenance and replacement technique designed for a radioactive vitrification plant have been developed and tested in a full scale handling mockup and in an inactive pilot plants by the Central Engineering Department of the Karlsruhe Nuclear Research Center. As a result of the development work and the tests it has been proved that the remote maintenance technique and remote handling equipment can be used without any technical problems and are suited for application in a radioactive waste vitrification plant

  4. Conceptual design of a test facility for the remote handling operations of the ITER Test Blanker Modules

    International Nuclear Information System (INIS)

    Marqueta, A.; Garcia, I.; Gomez, A.; Garcia, L.; Sedano, E.; Fernandez, I.

    2012-01-01

    Conceptual Design of a test facility for the remote handling operations of the ITER Test Blanket Modules. Conditions inside a fusion reactor are incompatible with conventional manual maintenance tasks. the same applies for ancillary equipment. As a consequence, it will become necessary to turn to remote visualization and remote handling techniques, which will have in consideration the extreme conditions, both physical and operating, of ITER. Main goal of the project has been the realization of the conceptual design for the test facility for the Test Blanket Modules of ITER and their associated systems, related to the Remote Handling operations regarding the Port Cell area. Besides the definition of the operations and the specification of the main components and ancillary systems of the TBM graphical simulation have been used for the design, verification and validation of the remote handling operations. (Author)

  5. Guidelines for remote handling maintenance of ITER neutral beam line components: Proposal of an alternate supporting system

    International Nuclear Information System (INIS)

    Cordier, J.J.; Bayetti, P.; Hemsworth, R.; David, O.; Friconneau, J.P.

    2007-01-01

    Remote handling (R/H) maintenance of ITER components is one of the main challenges of the ITER project. This type of maintenance shall be operational for the assembly and nuclear phase of exploitation of ITER. It must be considered at a very early stage since it significantly impacts on the components design, interfaces management, assembly, maintenance and integration aspects. A large part of the R/H equipment will be procured by the EU Participating Team, including the whole Neutral Beam R/H Equipment. The Neutral Beam Heating and Current Drive system (NB and CD) design is being revisited by the ITER project. A vertical maintenance scheme is presently considered which may significantly impact on the reference design and associated components and lead to a new design of the NB and CD vacuum tank. In addition, NB line components remote handling solutions are being studied. The neutral beam test facility ITER to be built in Europe in the near future is also based on the vertical NB maintenance scheme of beam line components. New design guidelines compliant for both the ITER NB and CD system and the NB test facility proposed by the CEA association are described in the paper

  6. State and outlooks of remote handling and automation techniques use for industrial radioactive operations

    International Nuclear Information System (INIS)

    Guilloteau, R.; Le Guennec, R.; Dumond, S.

    1981-01-01

    Handling in reactors mainly concerns charging and discharging operations and inspection. Specific means are being developed for each operation, with an increasing degree of automation. This serves to reduce exposure of personnel. However, the development of these means conflicts in certain cases with the original plant design, which did not provide for remote maintenance. With regard to fuel reprocessing, handling at the processing level is becoming increasingly automated. The difficulties lie principally in maintenance and waste conditioning operations. These involve less specialized means than is the case with reactors and can only be automated to a limited extent, save in exceptional cases. The greatest progress will be achieved by laying down stringent maintenance principles and taking them into consideration at the design stage

  7. Concept for a vertical maintenance remote handling system for multi module blanket segments in DEMO

    International Nuclear Information System (INIS)

    Coleman, M.; Sykes, N.; Cooper, D.; Iglesias, D.; Bastow, R.; Loving, A.; Harman, J.

    2014-01-01

    Highlights: •A conceptual architectural model for a vertical maintenance DEMO is presented. •Novel concepts for a set of DEMO remote handling equipment are put forward. •Remote maintenance of a multi module segment blanket is found to be feasible. •The criticality of space in the vertical port is highlighted. -- Abstract: The anticipated high neutron flux, and the consequent damage to plasma-facing components in DEMO, results in the need to regularly replace the tritium breeding and radiation shielding blanket. The current European multi module segment (MMS) blanket concept favours a less invasive small port entry maintenance system over large sector transport concepts, because of the reduced impact on other tokamak systems – particularly the magnetic coils. This paper presents a novel conceptual remote maintenance strategy for a Vertical Maintenance Scheme DEMO, incorporating substantiated designs for an in-vessel mover, to detach and attach the blanket segments, and cask-housed vertical maintenance devices to open and close access ports, cut and join service connections, and extract blanket segments from the vessel. In addition, a conceptual architectural model for DEMO was generated to capture functional and spatial interfaces between the remote maintenance equipment and other systems. Areas of further study are identified in order to comprehensively establish the feasibility of the proposed maintenance system

  8. Remote maintenance for fusion: Requirements vs technology gap

    International Nuclear Information System (INIS)

    Davis, F.C.; Kuban, D.P.

    1989-01-01

    Today's remote handling technology was developed in response to the remote maintenance (RM) requirements of the fission community's nuclear fuel recycle process. The needs of the fusion community present new challenges to the remote handling experts of the world. New difficulties are superimposed on the difficulties experienced in maintaining fission processes. Today's technology must be enhanced to respond to the RM needs of these future huge investments. This paper first discusses the current RM needs for fusion based on existing facilities and designs of future machines. It then exposes the gap between these requirements and existing RM technology and recommends ways to extend the state of the art to close this gap

  9. Pellet presses for remote fuel fabrication

    International Nuclear Information System (INIS)

    Densley, P.J.

    1978-01-01

    Two types of mechanical presses are being tested from the remote operation and remote maintenance aspects. Results will be used to recommend the type of press and design considerations required for operation in a remotely operated and maintained process line

  10. Remote-maintenance features of the Fusion Materials Irradiation Test (FMIT) facility lithium system

    International Nuclear Information System (INIS)

    Kelly, V.P.

    1981-01-01

    The FMIT Facitlity has been redesigned to allow remote maintenance of lithium system components such as the main lithium pump, heat exchanger, traps, and valves. Remote versus contact maintenance is required due to the limited effectiveness of methods planned for control of the radioisotope 7 Be which is formed in the lithium during the neutron generating process. The altered FMIT arrangement provides cubicles for isolation of the main pump and system dump valve to allow personnel access for completing welds on large diameter piping after replacing failed components. Maintenance on other components such as the main heat exchanger and traps will be done remotely. The resulting arrangement provides full capability to meet the required facility availability criteria with minimum impact on the facility and with minimum associated development costs

  11. Remote handling concept for the neutral beam system

    International Nuclear Information System (INIS)

    Choi, Chang-Hwan; Palmer, Jim; Conesa, Carles; Friconneau, Jean-Pierre; Martins, Jean-Pierre; Subramanian, Rajendran; Jeannoutot, Thomas; Graceffa, Joseph; Schunke, Beatrix; Uffelen, MarcoVan; Damiani, Carlo; Tesini, Alessandro

    2011-01-01

    The NB ITER Remote Maintenance System (NB IRMS) provides the means for the remote maintenance within the NB Cell by removal and replacement of the plant equipment. The NB IRMS will be installed and removed with the assistance of human workers during the preparation, and post-operation phase. During the maintenance operation after opening the Passive Magnetic Shield (PMS) and vessels, the maintenance activity and recovery from failure should be conducted remotely. This paper describes the concept design of the NB IRMS operating inside the NB cell for maintenance of the plant equipment such as NB components, and Upper Port Plugs (UPP). The main tasks of the IRMS, the description of the sub-systems and their specification, and deployment/operation principles are presented. The transportation concept of the NB IRMS to the hot cell facility for storage and maintenance is presented, which is to avoid unnecessary exposure on the equipment inside the NB cell during the machine operation.

  12. Remote operation for pipelines; Operacao remota para gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Teixeira, Paulo Lyra Borgerth [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes pipeline GASBOL which are remotely monitored, operated and controlled from a central control station in Rio de Janeiro, Brazil. This is a result of TBG's experience in design, construction and operation of compressor stations and city gates that are built for unattended operation. Only a small maintenance crew is necessary for routine tasks. In this connection, a complete set of resources has been implemented in order to ensure the required reliability level. This includes monitoring instruments, redundant systems and protections, together with automatic control system for each of the relevant components. Equipment status signals, process variables as well as alarm and trip signals are exchanged via a SCADA system with the Control and Supervision Center, CSC, in Rio de Janeiro. In addition, the CSC is capable of performing all relevant control actions such as start / stop compressor units and station auxiliaries, also remotely setting the station pressure and flow control points. The paper describes also the architecture and configuration of the supervisory and control functions which are performed by means of a SCADA system, along with the pipeline telecommunications system. (author)

  13. Tandem mirror next step: remote maintenance

    International Nuclear Information System (INIS)

    Doggett, J.N.; Damm, C.C.; Hanson, C.L.

    1980-01-01

    This study of the next proposed experiment in the Mirror Fusion Program, the Tandem Mirror Next Step (TMNS), has included serious consideration of the maintenance requirements of such a large source of high energy neutrons with its attendant throughput of tritium. Although maintenance will be costly in time and money, our conclusion is that with careful attention to a design for maintenance plan such a device can be reliably operated

  14. Tokamak Fusion Core Experiment (TFCX) special-purpose remote maintenance systems

    International Nuclear Information System (INIS)

    Masson, L.S.; Welland, H.J.

    1985-01-01

    A key element in the preconceptual design of the Tokamak Fusion Core Experiment (TFCX) was the development of design concepts for special-purpose remote maintenance systems. Included were systems for shield sector replacement, vacuum vessel sector and toroidal field coil replacement, limiter blade replacement, protective tile replacement, and general-purpose maintenance. This paper addresses these systems as they apply to the copper toroidal field (TF) coil version of the TFCX

  15. Underwater inspection and maintenance programs within nuclear and non-nuclear related operating systems

    International Nuclear Information System (INIS)

    Vallance, C.; Goulet, B.; Black, S.

    2008-01-01

    The increasing age of the nuclear and non-nuclear power generating facilities requires extended inspection, repair and maintenance (IRM) activities to prolong the operation of these facilities past their original design life. Commercial divers are often utilized to perform critical work at nuclear power plants, fuel reprocessing plants, waste storage facilities, and research institutions. These various tasks include inspection, welding, mechanical modifications and repairs, coating applications, and work associated with plant decommissioning. Programs may take place in areas such as the reactor vessel, equipment pool, spent fuel pool, and suppression chamber using manned intervention and remotely operated vehicles. Some of these tasks can also be conducted using remotely operated vehicles (ROV's). Although specialist robots are not uncommon to the nuclear industry, the use of free-swimming vehicle's and remote systems for the inspection of underwater assets has increased due to improvements of the supporting technologies and information requirements needed to extend the life of these facilities. This paper will provide an overview of the procedures and equipment necessary to perform unique work tasks using manned and unmanned techniques. (author)

  16. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  17. Aspects of remote maintenance in an FRG reprocessing plant from the manufacturer's viewpoint

    International Nuclear Information System (INIS)

    Zeitzchel, G.; Tennie, M.; Saal, G.

    1986-01-01

    In April 1986 a consortium led by Kraftwerk Union AG was commissioned by the German society for nuclear fuel reprocessing (DWK) to build the first West German commercial reprocessing plant for spent fuel assemblies. The main result of the planning efforts regarding remote maintenance operations inside the main process building was the introduction of FEMO technology (FEMO is an acronym based on German for remote handling modular technique). According to this technology the two cells in which the actual reprocessing (which is based on the PUREX technique) takes place are provided with frames to accommodate the process components (tanks, pumps, agitators, etc.), each frame together with the components which it supports forming one module. The two cells are inaccessible and windowless. For handling operations each cell is equipped with an overhead crane and a crane-like manipulator carrier system (MTS) with power manipulator. Viewing of the operations from outside the cells is made possible by television (TV) cameras installed at the crane, the MTS, and the manipulator. This paper addresses some examples of problems that still need to be solved in connection with FEMO handling. In particular, the need for close cooperation between the equipment operator, the component designer, the process engineer, the planning engineer, and the licensing authorities will be demonstrated

  18. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  19. Human factors in remote control engineering development activities

    International Nuclear Information System (INIS)

    Clarke, M.M.; Hamel, W.R.; Draper, J.V.

    1983-01-01

    Human factors engineering, which is an integral part of the advanced remote control development activities at the Oak Ridge National Laboratory, is described. First, work at the Remote Systems Development Facility (RSDF) has shown that operators can perform a wide variety of tasks, some of which were not specifically designed for remote systems, with a dextrous electronic force-reflecting servomanipulator and good television remote viewing capabilities. Second, the data collected during mock-up remote maintenance experiments at the RSDF have been analyzed to provide guidelines for the design of human interfaces with an integrated advanced remote maintenance system currently under development. Guidelines have been provided for task allocation between operators, remote viewing systems, and operator controls. 6 references, 5 figures, 2 tables

  20. Analysis of the ITER ECH Upper Port Launcher remote maintenance using virtual reality

    International Nuclear Information System (INIS)

    Elzendoorn, Ben; de Baar, Marco; Chavan, Rene; Goodman, Timothy; Heemskerk, Cock; Heidinger, Roland; Kleefeldt, Klaus; Koning, Jarich; Sanders, Stephen; Spaeh, Peter; Strauss, Dirk; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    All ITER sub-systems of remote handling (RH) classes 1 and 2 have to be remotely maintainable. The maintenance strategy for these components has to ensure system availability after failure or scheduled maintenance. This paper shows how virtual reality (VR) simulation can be used as a tool to analyze the maintenance process, to predict the mean time to repair and to ensure the RH compatibility of one ITER sub-system, the Upper Port Launcher (UPL) . Special emphasis is put on the development of RH procedures and the identification of tooling requirements. The possibility to simulate RH logistics and repair actions in an early stage of the design process allows for the identification of those maintenance actions that require dedicated tests in the Launcher Handling Test Facility at Karlsruhe. The VR analysis, together with dedicated mock-up tests will demonstrate the RH compatibility of the UPL plug, provide input to the design of the Port Plug maintenance area in the ITER Hot Cell, and support the development of RH maintenance tooling.

  1. Control software architecture and operating modes of the Model M-2 maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Satterlee, P.E. Jr.; Martin, H.L.; Herndon, J.N.

    1984-04-01

    The Model M-2 maintenance system is the first completely digitally controlled servomanipulator. The M-2 system allows dexterous operations to be performed remotely using bilateral force-reflecting master/slave techniques, and its integrated operator interface takes advantage of touch-screen-driven menus to allow selection of all possible operating modes. The control system hardware for this system has been described previously. This paper describes the architecture of the overall control system. The system's various modes of operation are identified, the software implementation of each is described, system diagnostic routines are described, and highlights of the computer-augmented operator interface are discussed. 3 references, 5 figures.

  2. Control software architecture and operating modes of the Model M-2 maintenance system

    International Nuclear Information System (INIS)

    Satterlee, P.E. Jr.; Martin, H.L.; Herndon, J.N.

    1984-04-01

    The Model M-2 maintenance system is the first completely digitally controlled servomanipulator. The M-2 system allows dexterous operations to be performed remotely using bilateral force-reflecting master/slave techniques, and its integrated operator interface takes advantage of touch-screen-driven menus to allow selection of all possible operating modes. The control system hardware for this system has been described previously. This paper describes the architecture of the overall control system. The system's various modes of operation are identified, the software implementation of each is described, system diagnostic routines are described, and highlights of the computer-augmented operator interface are discussed. 3 references, 5 figures

  3. Remote tool development at the Interim Examination and Maintenance (IEM) cell

    International Nuclear Information System (INIS)

    Kalk, J.J.

    1986-07-01

    Tightening fasteners remotely in a hot cell can be a very exasperating experience. In many places, viewing is difficult and work sometimes must be done using mirrors and/or cameras for viewing. If electromechanical manipulators are used, the operator has no ''feel'', which often can result in broken equipment. At the Interim Examination and Maintenance (IEM) Cell, where reactor components from the Fast Flux Test Facility (FFTF) are disassembled, several tools have been developed for tightening fasteners under these conditions. The philosophy used for this tool development is to use inexpensive commercially available tools with minimal modification for in-cell use. This philosophy was adopted after spending several years unsuccessfully trying to develop a special electric impact wrench

  4. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  5. Maintenance considerations of the Starfire Commercial Tokamak

    International Nuclear Information System (INIS)

    Trachael, C.A.; Zahn, H.S.; Field, R.E.; Stevens, H.C.

    1979-01-01

    An initial reactor design has been developed for the Starfire Tokamak reactor that incorporates maintenance features to permit reactor and plant operation with a 75% availability. All components of the reactor can be replaced utilizing highly automated remote maintenance techniques. Provisions for contact maintenance are included but would only be utilized on a contingency basis since it is believed that allowable dose rates will be decreased in future years. A modular design approach is used for the reactor and auxiliary subsystems to permit efficient use of remote maintenance. The modular approach minimizes the number of different maintenance operations required and can result in use of simple tasks such as push, pull, turn, etc., maneuvers for module removal. Fault isolation is provided for each replaceable module

  6. FFTF/IEM [Fast Flux Test Facility/Interim Examination and Maintenance] cell fuel pin weighing system: Remote maintenance design considerations

    International Nuclear Information System (INIS)

    Gibbons, P.W.

    1986-06-01

    A Fuel Pin Weighing Machine has been developed for use in the Fast Flux Test Facility (FFTF) Interim Examination and Maintenance (IEM) Cell to assist in identifying an individual breached fuel pin from its fuel assembly pin bundle. Optimum configuration for remote maintenance was a major consideration in the design of each element of the Pin Weighing System

  7. Blanket maintenance by remote means using the cassette blanket approach

    International Nuclear Information System (INIS)

    Werner, R.W.

    1978-01-01

    Induced radioactivity in the blanket and other parts of a fusion reactor close to the plasma zone will dictate remote assembly, disassembly, and maintenance procedures. Time will be of the essence in these procedures. They must be practicable and certain. This paper discusses the reduction of a complicated Tokamak reactor to a simpler assembly via the use of a vacuum building in which to house the reactor and the introduction in this new model of cassette blanket modules. The cassettes significantly simplify remote handling

  8. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  9. Techniques for remote maintenance of in-cell material-handling system in the HFEF/N main cell

    International Nuclear Information System (INIS)

    Tobias, D.A.; Frickey, C.A.

    1975-01-01

    Operations in the main cell of HFEF/N have required development of remote handling equipment and unique techniques for maintaining the in-cell material-handling system. Specially designed equipment is used to remove a disabled crane or electromechanical manipulator bridge from its support rails and place it on floor stands for repair or maintenance. Support areas for the main cell, such as the spray chamber and hot repair area, provide essential decontamination, repair, and staging areas for the in-cell material-handling-system equipment and tools. A combined engineering and technical effort in upgrading existing master-slave manipulators has definitely reduced the requirements for their maintenance. The cell is primarily for postirradiation examination of LMFBR materials and fuel elements

  10. Task analysis of human-in-the-loop tele-operated maintenance: What can be learned from JET?

    International Nuclear Information System (INIS)

    Boessenkool, H.; Thomas, J.; Heemskerk, C.J.M.; Baar, M.R. de; Steinbuch, M.; Abbink, D.A.

    2014-01-01

    Highlights: •Maintenance task execution at JET was analyzed to guide improvements for ITER. •A large variation in task duration was found for various operator experience levels. •Results indicate significant room for improvement for tele-operated performance. •Improvent of visual feedback and artificial guiding forces was considered promising. -- Abstract: Remote maintenance will determine the available uptime of future fusion plants such as ITER. Experience at predecessor JET showed that a human-in-the-loop tele-operated approach is crucial, although this approach entails drawbacks such as the unavoidable extensive operator training and relatively long execution times. These drawbacks are common knowledge, but little quantitative research is available to guide improvements (such as improved training methods, or active operator support systems). The aim of this paper is to identify the key areas for further improvement of tele-operated maintenance. This is achieved by a detailed task analysis based on recent maintenance at JET, using task logbooks and video data as well as interviews with experienced master–slave operators. The resulting task analysis shows the (sub)tasks that were most time-consuming and shows a large variance in time performance within operators, but also substantial differences between qualified operators with different levels of experience. The operator interviews indicate that intuitive (virtual) visual feedback and artificial (guiding) forces are promising directions for improvement. The results found in this study will be used for future research and development activities focusing on haptic guiding strategies, with the aim to further design and optimize RH maintenance systems for ITER and beyond

  11. Design of a multisystem remote maintenance control room

    International Nuclear Information System (INIS)

    Draper, J.V.; Handel, S.J.; Kring, C.T.; Kawatsuma, S.

    1988-01-01

    The Remote Systems Development Section of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory (ORNL) and Japan's Power Reactor and Nuclear Fuel Development Corporation (PNC) recently collaborated in the development of a control room concept for remote operations. This report describes design methods and the resulting control room concept. The design project included five stages. The first was compilation of a complete function list; functions are tasks performed by operators in the control room while operating equipment located in the remote area. The second step was organization of the function list into ''function groups;'' function groups are sets of functions that operate one piece of equipment. The third stage was determination of crew size and requirements for supervision. The fourth stage was development of conceptual designs of displays and controls. The fifth stage was development of plans for placement of crew stations within the control room. 5 figs., 1 tab

  12. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  13. Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops

    Directory of Open Access Journals (Sweden)

    Mehmet Talha Dulman

    2018-01-01

    Full Text Available Sensors are commonly employed to monitor products during their life cycles and to remotely and continuously track their usage patterns. Installing sensors into products can help generate useful data related to the conditions of products and their components, and this information can subsequently be used to inform EOL decision-making. As such, embedded sensors can enhance the performance of EOL product processing operations. The information collected by the sensors can also be used to estimate and predict product failures, thereby helping to improve maintenance operations. This paper describes a study in which system maintenance and EOL processes were combined and closed-loop supply chain systems were constructed to analyze the financial contribution that sensors can make to these procedures by using discrete event simulation to model and compare regular systems and sensor-embedded systems. The factors that had an impact on the performance measures, such as disassembly cost, maintenance cost, inspection cost, sales revenues, and profitability, were determined and a design of experiments study was carried out. The experiment results were compared, and pairwise t-tests were executed. The results reveal that sensor-embedded systems are significantly superior to regular systems in terms of the identified performance measures.

  14. Remote operational trials with the ITER FDR divertor handling equipment

    International Nuclear Information System (INIS)

    Irving, M.; Baldi, L.; Benamati, G.; Galbiati, L.; Giacomelli, S.; Lorenzelli, L.; Micciche, G.; Muro, L.; Polverari, A.; Palmer, J.; Martin, E.

    2003-01-01

    The ITER divertor test platform (DTP) located at ENEA's Research Centre in Brasimone, Italy is a full-scale mock-up of a 72 deg. arc of the ITER 1998 vessel divertor region--the result of a major initiative over the period 1996-2000. Since the implementation of this facility, the design of the ITER vessel--and therefore much of the remote maintenance equipment--has changed substantially. However, the nature and principles of the remote handling equipment are still very similar, and hence many valuable lessons can yet be learned from the existing equipment for the future. In particular, true remote handling tests of the major maintenance subsystems were seen as an important step in determining their suitability for ITER. This paper describes and documents a series of three, discrete, remote-handling trials carried out using most of the major DTP subsystems, and presents an overview of the conclusions and suggestions for future development of ITER cassette remote handling equipment

  15. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  16. Development of spent fuel remote handling technology

    Energy Technology Data Exchange (ETDEWEB)

    Park, B. S.; Yoon, J. S.; Hong, H. D. (and others)

    2007-02-15

    In this research, the remote handling technology was developed for the ACP application. The ACP gives a possible solution to reduce the rapidly cumulative amount of spent fuels generated from the nuclear power plants in Korea. The remote technologies developed in this work are a slitting device, a voloxidizer, a modified telescopic servo manipulator and a digital mock-up. A slitting device was developed to declad the spent fuel rod-cuts and collect the spent fuel UO{sub 2} pellets. A voloxidizer was developed to convert the spent fuel UO{sub 2} pellets obtained from the slitting process in to U{sub 3}O{sub 8} powder. Experiments were performed to test the capabilities and remote operation of the developed slitting device and voloxidizer by using simulated rod-cuts and fuel in the ACP hot cell. A telescopic servo manipulator was redesigned and manufactured improving the structure of the prototype. This servo manipulator was installed in the ACP hot cell, and the target module for maintenance of the process equipment was selected. The optimal procedures for remote operation were made through the maintenance tests by using the servo manipulator. The ACP digital mockup in a virtual environment was established to secure a reliability and safety of remote operation and maintenance. The simulation for the remote operation and maintenance was implemented and the operability was analyzed. A digital mockup about the preliminary conceptual design of an enginnering-scale ACP was established, and an analysis about a scale of facility and remote handling was accomplished. The real-time diagnostic technique was developed to detect the possible fault accidents of the slitting device. An assessment of radiation effect for various sensors was also conducted in the radiation environment.

  17. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  18. Operations and maintenance philosophy

    International Nuclear Information System (INIS)

    DUNCAN, G.P.

    1999-01-01

    This Operations and Maintenance (O and M) Philosophy document is intended to establish a future O and M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O and M lessons learned into on-going and future project upgrades

  19. Maintenance concept development for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.

    1988-01-01

    The Compact Ignition Tokamak (CIT), located at the Princeton Plasma Physics Laboratory, will be the next major experimental machine in the US Fusion Program. Its use of deuterium-tritium (D-T) fuel requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist of removing and repairing such components as diagnostic equipment modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the vacuum vessel includes both bridge-mounted and floor-mounted manipulator systems. Additionally, decontamination (decon) equipment, hot cell repair facilities, and equipment for handling and packaging solid radioactive waste (rad-waste) are being developed. Recent design activities have focused on establishing maintenance system interfaces with the facility design, developing manipulator system requirements, and using mock-ups to support the tokamak configuration design. 3 refs., 8 figs

  20. Void Fraction Instrument operation and maintenance manual

    International Nuclear Information System (INIS)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01

    This Operations and Maintenance Manual (O ampersand MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document

  1. Verifying elementary ITER maintenance actions with the MS2 benchmark product

    NARCIS (Netherlands)

    Heemskerk, C. J. M.; Elzendoorn, B. S. Q.; Magielsen, A. J.; Schropp, G. Y. R.

    2011-01-01

    A new facility has been taken in operation to investigate the influence of visual and haptic feedback on the performance of remotely executed ITER RH maintenance tasks. A reference set of representative ITER remote handling maintenance tasks was included the master slave manipulator system (MS2)

  2. ITER - torus vacuum pumping system remote handling issues

    International Nuclear Information System (INIS)

    Stringer, J.

    1992-11-01

    This report describes further design issues concerning remote maintenance of torus vacuum pumping systems options for ITER. The key issues under investigation in this report are flask support systems for valve seal exchange operations for the compound cryopump scheme and remote maintenance of a proposed multiple turbomolecular pump (TMP) system, an alternative ITER torus exhaust pumping option. Previous studies have shown that the overhead support methods for seal exchange flask equipment could malfunction due to valve/flask misalignment. A floor-mounted support system is described in this report. This scheme provides a more rigid support system for seal exchange operations. An alternative torus pumping system, based on the use of multiple TMPs, is studied from a remote maintenance standpoint. In this concept, centre distance spacing for pump/valve assemblies is too restrictive for remote maintenance. Recommendations are made for adequate spacing of these assemblies based on commercially-available 0.8 m and 1.0 m diameter valves. Fewer pumps will fit in this arrangement, which implies a need for larger TMPs. Pumps of this size are not commercially available. Other concerns regarding the servicing and storage of remote handling equipment in cells are also identified. (9 figs.)

  3. New achievements of the Divertor Test Platform programme for the ITER divertor remote maintenance R and D

    International Nuclear Information System (INIS)

    Damiani, C.; Baldi, L.; Galbiati, L.; Irving, M.; Lorenzelli, L.; Micciche, G.; Muro, L.; Nucci, S.; Varocchi, G.; Poggianti, A.; Fermani, G.; Maisonnier, D.; Palmer, J.; Martin, E.; Friconneau, J.P.; Gravez, P.; Takeda, N.

    2001-01-01

    The divertor assembly for the ITER fusion reactor consists of a number of rail mounted cassettes (54 now in ITER FEAT) located in the bottom region of the vacuum vessel. These cassettes shall be removed/installed remotely during the life of the reactor by means of specific devices. To demonstrate and optimise the feasibility of the in-vessel maintenance process the Divertor Test Platform (DTP) has been established at the ENEA Research Centre in Brasimone, Italy, as a major part of the large ITER R and D project L7. A first set of tests has been already carried out and reported during 1998, when the basic feasibility of the divertor replacement was demonstrated. In the present period (January 1999-July 2000), new activities, including both site tests and other 'external' R and D works, have been carried out in order to refine and improve the ITER divertor maintenance scenario. These include the study of abnormal maintenance operations and of possible handling equipment failure and its consequences; the procurement and testing of new sub-systems (e.g. a force reflection manipulator arm), and the development of remote handling techniques including a virtual reality system. Following a short description of the DTP, this paper reports on the new results and achievements, draws the relevant conclusions, and finally discusses future activities

  4. Development and performance tests of the bridge-transported servo manipulator system for remote maintenance jobs in a hot cell

    International Nuclear Information System (INIS)

    Jin, Jae Hyun; Park, Byung Suk; Ko, Byung Seung; Yoon, Ji Sup; Jung, Ki Jung

    2005-01-01

    In this paper, a prototype of the Bridge-Transported Servo Manipulator (BTSM) system introduced, which has been developed to do operation and maintenance jobs remotely in a hot cell. The system consists of a telescopic transporter, a slave arm, a master arm, and a control system. Several tests such as a positional tracking, a weight handling, reliability, and operability have been performed and test results are presented. Based on the test results, an upgraded system which will be used during demonstrations of the advanced spent fuel conditioning process (ACP) has been designed.

  5. Ex-vessel remote maintenance development plans for the Burning Plasma Experiment

    International Nuclear Information System (INIS)

    Burgess, T.W.; Davis, F.C.

    1991-01-01

    Remote maintenance (RM) is fundamental to the basic design requirements of the Burning Plasma Experiment (BPX), and an extensive RM development and demonstration program is planned to meet these requirements. The program first draws from the experience base that exists in the fission community and Europe's Joint European Torus (JET) Project. Successful solutions are applied where possible and, in many cases, improved in order to achieve the performance demanded by a multiyear program that must be capable of efficiently executing RM procedures. Early, concurrent efforts in the design and fabrication of prototype remote handling (RH) equipment, remote tooling, and maintainable machine components will precede an extensive use of mock-up equipment in order to test, develop, and demonstrate the technology. 7 refs,. 5 figs

  6. Maintenance features of the Compact Ignition Tokamak fusion reactor

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Hager, E.R.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is envisaged to be the next experimental machine in the US Fusion Program. Its use of deuterium/tritium fuel requires the implementation of remote handling technology for maintenance and disassembly operations. The reactor is surrounded by a close-proximity nuclear shield which is designed to permit personnel access within the test cell, one day after shutdown. With the shield in place, certain maintenance activities in the cell may be done hands-on. Maintenance on the reactor is accomplished remotely using a boom-mounted manipulator after disassembling the shield. Maintenance within the plasma chamber is accomplished with two articulated boom manipulators that are capable of operating in a vacuum environment. They are stored in a vacuum enclosure behind movable shield plugs

  7. Design and operation of equipment used to develop remote coating capability for HTGR fuel particles

    International Nuclear Information System (INIS)

    Suchomel, R.R.; Stinton, D.P.; Preston, M.K.; Heck, J.L.; Bolfing, B.J.; Lackey, W.J.

    1978-12-01

    Refabrication of HTGR fuels is a manufacturing process that consists of preparation of fuel kernels, application of multiple layers of pyrolytic carbon and silicon carbide, preparation of fuel rods, and assembly of fuel rods into fuel elements. All the equipment for refabrication of 233 U-containing fuel must be designed for completely remote operation and maintenance in hot-cell facilities. Equipment to remotely coated HTGR fuel particles has been designed and operated. Although not all of the equipment development needed for a fully remote coating system has been completed, significant progress has been made. The most important component of the coating furnace is the gas distributor, which must be simple, reliable, and easily maintainable. Techniques for loading and unloading the coater and handling microspheres have been developed. An engineering-scale system, currently in operation, is being used to verify the workability of these concepts. Coating crucible handling components are used to remove the crucible from the furnace, remove coated particles, and exchange the crucible, if necessary. After the batch of particles has been unloaded, it is transferred, weighed, and sampled. The components used in these processes have been tested to ensure that no particle breakage or holdup occurs. Tests of the particle handling system have been very encouraging because no major problems have been encountered. Instrumentation that controls the equipment performed very smoothly and reliably and can be operated remotely

  8. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  9. Inertial Fusion Power Plant Concept of Operations and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Anklam, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Knutson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dunne, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kasper, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sheehan, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lang, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Roberts, V. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mau, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  10. Remote fabrication of breeder reactor fuel

    International Nuclear Information System (INIS)

    Gerber, E.W.; Hoitink, N.C.; Graham, R.A.

    1984-06-01

    The Secure Automated Fabrication (SAF) Line, a remotely operable plutonium fuel fabrication facility, incorporates advanced automation techniques. Included in the plant are 24 robots used to perform complex operations, and to enhance equipment standardization and ease of maintenance. Automated equipment is controlled remotely from centrally located supervisory computer control consoles or alternatively from control consoles dedicated to individual systems

  11. Development of a remotely maintainable radio-frequency module for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Snider, J.D.

    1988-01-01

    The Compact Ignition Tokamak (CIT) will require reliable remote handling (RH) systems to overcome failures in diagnostic and operational equipment. Oak Ridge National laboratory (ORNL) is responsible for the ex-vessel remote maintenance systems for the CIT. Part of this effort is performing remote maintenance demonstrations on replicas of various CIT equipment. To ensure successful RH, the machine must be designed with proven remote maintenance features. In the demonstrations, critical remote maintenance features are tested before actual CIT equipment designs are finalized. Designs and procedures required to remotely remove and install a radio-frequency (rf) module from a modplane port on the tokamak were recently demonstrated at ORNL. This testing identified both successful design features for remote maintenance of the rf module and areas that require further development. 1 ref., 11 figs

  12. INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, Y.

    1984-01-01

    The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach

  13. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance,......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  14. Remote tooling applications at the FFTF/IEM cell

    International Nuclear Information System (INIS)

    Webb, R.H.

    1990-01-01

    At the fast flux test facility, a US Government-owned 400-MW(thermal) sodium-cooled fast reactor, the interim examination and maintenance (IEM) cell is used for the remote disassembly of irradiated fuel and material experiments and remote maintenance operations. The IEM cell has been a challenging area both for maintenance and operation of remote equipment. Innovative tooling has been required to provide the reliability, strength and dexterity for performing myriad bolting, cutting, gripping, and other such functions. Over the years, a set of basic components that can be modified and adapted to several applications has been developed. These include torque multipliers, torque limiters, right-angle drives, and many common hand tools with fittings designed to be handled by master-slave manipulators (MSM) or electromechanical manipulator (EMM) hands. An example of such a system is the closed loop ex-vessel machine (CLEM) grapple change tool, which is designed for both hands-on use in a glove box and remote use in the IEM cell

  15. Remote operations and interactions for systems of arbitrary-dimensional Hilbert space: State-operator approach

    International Nuclear Information System (INIS)

    Reznik, Benni; Groisman, Berry; Aharonov, Yakir

    2002-01-01

    We present a systematic simple method for constructing deterministic remote operations on single and multiple systems of arbitrary discrete dimensionality. These operations include remote rotations, remote interactions, and measurements. The resources needed for an operation on a two-level system are one ebit and a bidirectional communication of two cbits, and for an n-level system, a pair of entangled n-level particles and two classical 'nits'. In the latter case, there are n-1 possible distinct operations per n-level entangled pair. Similar results apply for generating interaction between a pair of remote systems, while for remote measurements only one-directional classical communication is needed. We further consider remote operations on N spatially distributed systems, and show that the number of possible distinct operations increases here exponentially, with the available number of entangled pairs that are initially distributed between the systems. Our results follow from the properties of a hybrid state-operator object (stator), which describes quantum correlations between states and operations

  16. Remote handling facility and equipment used for space truss assembly

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1987-01-01

    The ACCESS truss remote handling experiments were performed at Oak Ridge National Laboratory's (ORNL's) Remote Operation and Maintenance Demonstration (ROMD) facility. The ROMD facility has been developed by the US Department of Energy's (DOE's) Consolidated Fuel Reprocessing Program to develop and demonstrate remote maintenance techniques for advanced nuclear fuel reprocessing equipment and other programs of national interest. The facility is a large-volume, high-bay area that encloses a complete, technologically advanced remote maintenance system that first began operation in FY 1982. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the DOE, the Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan, and the US Navy in addition to the National Aeronautics and Space Administration. ACCESS truss remote assembly was performed in the ROMD facility using the Central Research Laboratory's (CRL) model M-2 servomanipulator. The model M-2 is a dual-arm, bilateral force-reflecting, master/slave servomanipulator which was jointly developed by CRL and ORNL and represents the state of the art in teleoperated manipulators commercially available in the United States today. The model M-2 servomanipulator incorporates a distributed, microprocessor-based digital control system and was the first successful implementation of an entirely digitally controlled servomanipulator. The system has been in operation since FY 1983. 3 refs., 2 figs

  17. Principles of machine operation and maintenance

    CERN Document Server

    Jeffrey, Dick

    2013-01-01

    This book explains how rotating machinery works, and the role of the maintenance engineer in ensuring its proper operation. Stress is laid on the need for the trainee engineer to develop skills in diagnosis and troubleshooting as well as practicalexpertise in maintenance procedures.

  18. Remote support services using condition monitoring and online sensor data for offshore oilfield

    OpenAIRE

    Du, Baoli

    2013-01-01

    Master's thesis in Offshore technology Based on advanced technology in condition monitoring and online sensor data, a new style of operation and maintenance management called remote operation and maintenance support services has been created to improve oil and gas E&P performance. This master thesis will look into how the remote support service is conducted including the concept, design, technology and management philosophies; the current implementation of remote support services in China,...

  19. Production optimization of remotely operated gas wells

    Energy Technology Data Exchange (ETDEWEB)

    Juell, Aleksander

    2012-07-01

    From the introduction: The Remote Operations in Oklahoma Intended for Education (ROOKIE) project is a remote field laboratory constructed as a part of this research project. ROOKIE was initiated to provide data in research on production optimization of low productivity gas wells. In addition to this, ROOKIE is used as a teaching tool. Much of the remote operations technology used in the ROOKIE project has been used by the industry for several decades. The first use of remote data acquisition in Oklahoma was in 1989, as described by Luppens [7]. Even though this, for the most part, is old technology, the ROOKIE project is the first remote operations project set up with research and teaching as the main focus. This chapter will discuss the process of establishing the remote field laboratory and the data storage facilities. Results from the project will also be discussed. All testing, instrumentation installation, and modifications to the wells discussed in this chapter was performed by the author. The communication system between the well and NTNU, and the storage database was installed and configured by the author.(Author)

  20. A Perspective on Remote Handling Operations and Human Machine Interface for Remote Handling in Fusion

    International Nuclear Information System (INIS)

    Haist, B.; Hamilton, D.; Sanders, St.

    2006-01-01

    A large-scale fusion device presents many challenges to the remote handling operations team. This paper is based on unique operational experience at JET and gives a perspective on remote handling task development, logistics and resource management, as well as command, control and human-machine interface systems. Remote operations require an accurate perception of a dynamic environment, ideally providing the operators with the same unrestricted knowledge of the task scene as would be available if they were actually at the remote work location. Traditional camera based systems suffer from a limited number of viewpoints and also degrade quickly when exposed to high radiation. Virtual Reality and Augmented Reality software offer great assistance. The remote handling system required to maintain a tokamak requires a large number of different and complex pieces of equipment coordinating to perform a large array of tasks. The demands on the operator's skill in performing the tasks can escalate to a point where the efficiency and safety of operations are compromised. An operations guidance system designed to facilitate the planning, development, validation and execution of remote handling procedures is essential. Automatic planning of motion trajectories of remote handling equipment and the remote transfer of heavy loads will be routine and need to be reliable. This paper discusses the solutions developed at JET in these areas and also the trends in management and presentation of operational data as well as command, control and HMI technology development offering the potential to greatly assist remote handling in future fusion machines. (author)

  1. Survey of Operators Knowledge of Operation and Maintenance of ...

    African Journals Online (AJOL)

    Result showed that the machine failures encountered during operations were as a result of poor management, inadequate maintenance practices, and lack of spare parts, obsoleteness, overloading, careless operations and poor storage of machine after use. Recommendations were therefore given to improve the operation ...

  2. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, T; Koga, A; Shirasu, I; Miida, T

    1983-06-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenance works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is difficult to replace with machines due to their diversified and complex nature.

  3. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    1983-08-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenence works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today are so difficult to replace with machines due to their deversified and complexed nature.

  4. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    1983-01-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenance works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is so defficult to replace with machines due to their diversified and complexed nature.

  5. Low power reactor for remote applications

    International Nuclear Information System (INIS)

    Meier, K.L.; Palmer, R.G.; Kirchner, W.L.

    1985-01-01

    A compact, low power reactor is being designed to provide electric power for remote, unattended applications. Because of the high fuel and maintenance costs for conventional power sources such as diesel generators, a reactor power supply appears especially attractive for remote and inaccessible locations. Operating at a thermal power level of 135 kWt, the power supply achieves a gross electrical output of 25 kWe from an organic Rankine cycle (ORC) engine. By intentional selection of design features stressing inherent safety, operation in an unattended mode is possible with minimal risk to the environment. Reliability is achieved through the use of components representing existing, proven technology. Low enrichment uranium particle fuel, in graphite core blocks, cooled by heat pipes coupled to an ORC converter insures long-term, virtually maintenance free, operation of this reactor for remote applications. 10 refs., 7 figs., 3 tabs

  6. Analysis of the options - rationale for servomanipulator maintenance in future reprocessing plants

    International Nuclear Information System (INIS)

    Herndon, J.N.; Hamel, W.R.

    1984-04-01

    The currently available maintenance systems which can be applied, in various combinations, to large-volume in-cell maintenance operations are: (1) contact, (2) overhead cranes, (3) power manipulators, (4) mechanical master/slave manipulators, and (5) servomanipulators. The requirements for reprocessing plant maintenance are reviewed, and the capabilities of remote maintenance systems are described. A basic trade-off analysis of these remote maintenance systems considering reprocessing plant requirements is given. Justification is given for selecting the overhead crane/servomanipulator-based maintenance concept as the option most desirable for future large reprocessing plant maintenance. 23 references, 6 tables

  7. Design of remote handling equipment for the ITER NBI

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1999-08-01

    The ITER machine has three Neutral Beam Injectors (NBIs) placed tangential to the plasma at a minimum radius of 6.25 m. During operation, neutrons produced by the D-T reactions will irradiate the NBI structure and it will become radioactive. Radiation levels will be such that all subsequent maintenance of the NBIs must be carried out remotely. The presence of tritium and possibly radioactive dust requires that precautions be taken during maintenance to prevent the escape of these contaminants beyond the prescribed boundaries. The scope of this task is both the development of remote maintenance procedures and the design of the remote handling equipment to handle the NBIs. This report describes the design of remote handling tools for the ion source and its filaments, transfer cask, maintenance time, manufacturing schedule and cost estimation. (author)

  8. Remote operated valves - the Bolivian approach

    Energy Technology Data Exchange (ETDEWEB)

    Cuellar, O.; Arce, G.; Blanco, E.; Collazos, A.; Chavarria, E. [Transredes S.A., Transporte de Hidrocarburos, La Paz (Bolivia)

    2005-07-01

    For pipeline operators, the Remote Operated Valves (ROV) are tools to isolate pipe segments and contain any potential spill and they are also useful tools to provide data on operating conditions. Projects and articles about the locations and site layouts were developed to install Remote Operated Valves and the criteria for their use; each location has its own environmental, social and logistical particulars. This article describes the approach used to install ROV in Bolivia and the final design installed discussions and lessons learned about the: criteria to define the location, layout equipment installed and shelter and particulars of the location. (author)

  9. Remote operation and automation of the maintenance works under the radiation field

    International Nuclear Information System (INIS)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro

    1983-01-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenence works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is so difficult to replace with machines due to their deversified and complexed nature. (author)

  10. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  11. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  12. REMOTE OPERATIONS IN A GLOBAL ACCELERATOR NETWORK

    International Nuclear Information System (INIS)

    PEGGS, S.; SATOGATA, T.; AGARWAL, D.; RICE, D.

    2003-01-01

    The INTRODUCTION to this paper summarizes the history of the Global Accelerator Network (GAN) concept and the recent workshops that discussed the relationship between GAN and Remote Operations. The REMOTE OPERATIONS SCENARIOS section brings out the organizational philosophy embodied in GAN-like and to non-GAN-like scenarios. The set of major TOPICS RAISED AT THE WORKSHOPS are only partially resolved. COLLABORATION TOOLS are described and discussed, followed by examples of REMOTE ACCELERATOR CONTROL PROJECTS around the world

  13. Remote operations in a global accelerator network

    International Nuclear Information System (INIS)

    Peggs, Steve; Satogata, Todd; Agarwal, Deborah; Rice, David

    2003-01-01

    The INTRODUCTION to this paper summarizes the history of the Global Accelerator Network (GAN) concept and the recent workshops that discussed the relationship between GAN and Remote Operations. The REMOTE OPERATIONS SCENARIOS section brings out the organizational philosophy embodied in GAN-like and to non-GAN-like scenarios. The set of major TOPICS RAISED AT THE WORKSHOPS are only partially resolved. COLLABORATION TOOLS are described and discussed, followed by examples of REMOTE ACCELERATOR CONTROL PROJECTS around the world

  14. REMOTE OPERATIONS IN A GLOBAL ACCELERATOR NETWORK.

    Energy Technology Data Exchange (ETDEWEB)

    PEGGS,S.; SATOGATA,T.; AGARWAL,D.; RICE,D.

    2003-05-12

    The INTRODUCTION to this paper summarizes the history of the Global Accelerator Network (GAN) concept and the recent workshops that discussed the relationship between GAN and Remote Operations. The REMOTE OPERATIONS SCENARIOS section brings out the organizational philosophy embodied in GAN-like and to non-GAN-like scenarios. The set of major TOPICS RAISED AT THE WORKSHOPS are only partially resolved. COLLABORATION TOOLS are described and discussed, followed by examples of REMOTE ACCELERATOR CONTROL PROJECTS around the world.

  15. ATLAS Maintenance and Operation management system

    CERN Document Server

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  16. Remote handling systems for the Pride application

    International Nuclear Information System (INIS)

    Kim, K.; Lee, J.; Lee, H.; Kim, S.; Kim, H.

    2010-10-01

    In this paper is described the development of remote handling systems for use in the pyro processing technology development. Remote handling systems mainly include a BDSM (Bridge transported Dual arm Servo-Manipulator) and a simulator, all of which will be applied to the Pride (Pyro process integrated inactive demonstration facility) that is under construction at KAERI. BDMS that will traverse the length of the ceiling is designed to have two pairs of master-slave manipulators of which each pair of master-slave manipulators has a kinematic similarity and a force reflection. A simulator is also designed to provide an efficient means for simulating and verifying the conceptual design, developments, arrangements, and rehearsal of the pyro processing equipment and relevant devices from the viewpoint of remote operation and maintenance. In our research is presented activities and progress made in developing remote handling systems to be used for the remote operation and maintenance of the pyro processing equipment and relevant devices in the Pride. (Author)

  17. Operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ackermann, G.

    1987-01-01

    This textbook gives a systematic introduction into the operational and maintenance activities in nuclear power plants with pressurized water reactors. Subjects: (1) Setup and operational behaviour of power reactors, (2) setup of nuclear power plants, (3) radiation protection and nuclear safety, (4) nuclear fuel, (5) constructional layout of nuclear power plants, (6) management, and (7) maintenance. 158 figs., 56 tabs

  18. Interim design status and operational report for remote handling fixtures: primary and secondary burners

    International Nuclear Information System (INIS)

    Burgoyne, R.M.

    1976-12-01

    The HTGR reprocessing flowsheet consists of two basic process elements: (1) spent fuel crushing and burning and (2) solvent extraction. Fundamental to these elements is the design and development of specialized process equipment and support facilities. A major consideration of this design and development program is equipment maintenance: specifically, the design and demonstration of selected remote maintenance capabilities and the integration of these into process equipment design. This report documents the current status of the development of remote handling and maintenance fixtures for the primary and secondary burners

  19. In-vessel maintenance concepts for tokamak fusion reactors

    International Nuclear Information System (INIS)

    Kelly, V.P.; Berger, J.D.; Yount, J.A.

    1983-01-01

    Concepts for rail-mounted and guided in-vessel handling machines (IVM) for remote maintenance inside tokamak fusion reactors are described. The IVM designs are based on concepts for tethered remotely operated vehicles and feature the use of multiple manipulator arms for remote handling and remote-controlled TV cameras for remote viewing. The concepts include IVMs for both single or dual rail systems located in the top or bottom of the reactor vessel

  20. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  1. Remote handling procedures in JET

    International Nuclear Information System (INIS)

    Raimondi, T.; Huguet, M.

    1976-01-01

    Remote maintenance will be needed in the second phase of operation due to the structural activation produced by deuterium-tritium discharges. Priority will be given to tasks which require frequent intervention, but efforts will be made also to tackle larger operations such as replacement of an octant. Owing to the variety and unpredictability of the operations which may be required, general purpose telemanipulator and TV systems will be used, mounted on versatile articulated supports capable of reaching the various parts of the machine. An experimental programme is planned to test the envisaged equipment and develop procedures for carrying out the various tasks as they are more clearly identified. Design of peripheral equipment for easy accessibility, choice of simple connection methods, development of auxiliary tools, as well as careful programming of the operations, will be essential for successful remote maintenance. The effort put into these areas will, however, also result in considerable time saving during the assembly and maintenance in non-active conditions. Preliminary feasibility tests of some difficult operations have already been done with a force-reflecting servo-manipulator and two TV sets for front and side viewing. Leak identification and precision welding for vacuum tightness were demonstrated

  2. Development of remote handling technology for nuclear fuel cycle facilities in Japan

    International Nuclear Information System (INIS)

    Maekawa, Hiromichi; Sakai, Akira; Miura, Noriaki; Kozaka, Tetsuo; Hamada, Takashi

    2015-01-01

    Remote handling technology has been systematically developed for nuclear fuel cycle facilities in Japan since 1970s, primarily in parallel with the development of reprocessing and HLLW (High Level Liquid Waste) vitrification process. In case of reprocessing and vitrification process to handle highly radioactive and hazardous materials, the most of components are installed in the radiation shielded hot cells and operators are not allowed to enter the work area in the cells for operation and maintenance. Therefore, a completely remote handling system is adopted for the cells to reduce radiation doses of operators and increase the availability of the facility. The hot cells are generally designed considering the scale of components (laboratory, demonstration, or full-scale), the function of the systems (chemical process, material handling, dismantling, decontamination, or chemical analysis), and the environmental conditions (radiation dose rate, airborne concentration, surface contamination, or fume/mist/dust). Throughout our domestic development work for remote handling technology, the concept of the large scale integrated cell has been adopted rather than a number of small scale separated cells, for the reasons to reduce the total installation space and the number of remote handling equipment required for the each cell as much as possible. In our domestic remote maintenance design, several new concepts have been developed, tested, and demonstrated in the Tokai Virtrification Facility (TVF) and the Rokkasho HLLW Vitrification and Storage Facility (K-facility). Layout in the hot cells, the performance of remote handling equipment, and the structure of the in-cell components are important factors for remote maintenance design. In case of TVF (hot tests started in 1995), piping and vessels are prefabricated in the rack modules and installed in two lines on both sides of the cell. These modules are designed to be remotely replaced in the whole rack. Two overhead cranes

  3. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    NARCIS (Netherlands)

    Heemskerk, C.J.M.; Eendebak, P.T.; Schropp, G.Y.R.; Hermes, H.V.; Elzendoorn, B.S.Q.; Magielsen, A.J.

    2013-01-01

    Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators

  4. Remote operation system for container

    International Nuclear Information System (INIS)

    Nakahara, Hirotaka; Hayata, Takashi; Kajiyama, Shigeru; Takahashi, Fuminobu

    1998-01-01

    The present invention provides a remote operation system for conducting operation with operation reaction for the inside of a container filled with water (liquid), such as of inner walls and inner structural materials of a BWR type reactor. Namely, a swimming robot comprises a swimming device swimming in the liquid and an attaching/detaching device for holding/releasing the handling robot. A control device remotely operate the swimming robot and the handling robot by way of a cable. A cable processing device takes up or dispenses the cable. In addition, when the swimming robot grasps the handling robot by the attaching/detaching device, the swimming robot transmits an operation instruction sent from the control device by way of the cable to the handling robot. After the attaching/detaching device of the swimming robot releases the handling robot, the handling robot operates based on the transmitted operation instruction. It is preferable that the handling robot has an adsorptive moving device for moving itself while being adsorbed on the wall surface of the container. (I.S.)

  5. A historical perspective of remote operations and robotics in nuclear facilities

    International Nuclear Information System (INIS)

    Herndon, J.N.

    1992-01-01

    The field of remote technology is continuing to evolve to support man's efforts to perform tasks in hostile environments. The technology which we recognize today as remote technology has evolved over the last 45 years to support human operations in hostile environments such as nuclear fission and fusion, space, underwater, hazardous chemical, and hazardous manufacturing. The four major categories of approach to remote technology have been (1) protective clothing and equipment for direct human entry, (2) extended reach tools using distance for safety, (3) telemanipulators with barriers for safety, and (4) teleoperators incorporating mobility with distance and/or barriers for safety. The government and commercial nuclear industry has driven the development of the majority of the actual teleoperator hardware available today. This hardware has been developed largely due to the unsatisfactory performance of the protective-clothing approach in many hostile applications. Manipulation systems which have been developed include crane/impact wrench systems, unilateral power manipulators, mechanical master/slaves, and servomanipulators. Viewing systems have included periscopes, shield windows, and television systems. Experience over the past 45 years indicates that maintenance system flexibility is essential to typical repair tasks because they are usually not repetitive, structured, or planned. Fully remote design (manipulation, task provisions, remote tooling, and facility synergy) is essential to work task efficiency. Work for space applications has been primarily research oriented with relatively few successful space applications, although the shuttle's remote manipulator system has been quite successful. In the last decade, underwater applications have moved forward significantly, with the offshore oil industry and military applications providing the primary impetus

  6. Space teleoperation research. American Nuclear Society Executive conference: Remote operations and robotics in the nuclear industry; remote maintenance in other hostile environments

    Science.gov (United States)

    Meintel, A. J., Jr.; Will, R. W.

    1985-01-01

    This presentation consists of four sections. The first section is a brief introduction to the NASA Space Program. The second portion summarized the results of a congressionally mandated study of automation and robotics for space station. The third portion presents a number of concepts for space teleoperator systems. The remainder of the presentation describes Langley Research Center's teleoperator/robotic research to support remote space operations.

  7. Development of radiation hard components for remote maintenance

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Obara, Kenjiro; Kakudate, Satoshi; Tominaga, Ryuichiro; Akada, Tamio; Morita, Hirosuke.

    1997-01-01

    In International Thermonuclear Experimental Reactor (ITER), in-vessel remote-handling is inevitably required to assemble and maintain activated in-vessel components due to D-T operation. The components of the in-vessel remote-handling system must have sufficient radiation hardness to allow for operation under an intense gamma-ray radiation of over 30 kGy/h for periods up to more than 1,000 hours. To this end, extensive irradiation tests and quality improvements including the optimization of material composition have been conducted through the ITER R and D program in order to develop radiation hard components which satisfy radiation doses from 10 MGy to 100 MGy at the dose rate of 10 kGy/h. This paper outlines the latest status of the radiation hard component development that has been conducted as the Japan Home Team's contribution to ITER. The remote-handling components tested are categorized into either robotics, viewing systems or common components. The irradiation tests include commercial base products for screening both modified and newly developed products to improve their radiation hardness. (author)

  8. The ITER EC H&CD Upper Launcher: Analysis of vertical Remote Handling applied to the BSM maintenance

    NARCIS (Netherlands)

    Grossetti, G.; Aiello, G.; Heemskerk, C.; Elzendoorn, B.; Geßner, R.; Koning, J.; Meier, A.; Ronden, D.; Späh, P.; Scherer, T.; Schreck, S.; Strauß, D.; Vaccaro, A.

    2013-01-01

    This paper deals with Remote Handling activities foreseen on the Blanket Shield Module, the plasma facing component of the ITER Electron Cyclotron Heating and Current Drive Upper Launcher. The maintenance configuration considered here is the Vertical Remote Handling, meaning gravity acting along the

  9. In-cell maintenance by manipulator arm with 3D workspace information recreated by laser rangefinder

    International Nuclear Information System (INIS)

    Kitamura, Akihiro; Nakai, Koji; Namekawa, Takashi; Watahiki, Masatoshi

    2011-01-01

    Highlights: → We developed a remote control system for maintenance of in-cell type fuel fabrication equipment. → The system display recreated three-dimensional information of the workspace from data obtained by laser rangefinder and conventional cameras. It has allowed us to operate a manipulator arm remotely with several control modes. → We implemented remote handling experiments using mock up equipment. Performance was compared for remote operation conducted using several different display and operation modes. → It was observed that integration of 3D information from the laser rangefinder reduced operation time and reinforced visual information during remote operation. - Abstract: We developed a remote control system for maintenance of in-cell type fuel fabrication equipment. The system display recreated three-dimensional information of the workspace from data obtained by laser rangefinder and conventional cameras. It has allowed us to operate a manipulator arm remotely with several control modes. In order to evaluate the effectiveness and usefulness of developed system, we implemented remote handling experiments using mock up equipment. Performance was compared for remote operation conducted using several different display and operation modes. We confirmed that the system is able to maintain in-cell fuel fabrication equipment in each display and operation mode. Times required to complete the remote operations were collected and compared in each mode. It was observed that integration of 3D information from the laser rangefinder reduced operation time and reinforced visual information during remote operation.

  10. 7 CFR 654.12 - Financing operations and maintenance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Financing operations and maintenance. 654.12 Section 654.12 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES... Financially-Assisted Projects § 654.12 Financing operations and maintenance. Sources of funds needed to...

  11. US remote monitoring operational experience

    International Nuclear Information System (INIS)

    Dupree, S.A.; Sonnier, C.S.

    1997-01-01

    Under international partnerships and bilateral agreements with the U.S. Department of Energy, Sandia National Laboratories, other national laboratories, and international partner organizations have emplaced remote monitoring systems in nuclear facilities and laboratories in various parts of the world for the purpose of conducting field trials of remote monitoring. The purpose of the present report is to review the results from these field trials and draw general conclusions regarding the trials. Many thousands of hours of sensor and system operation have been logged, and data have been retrieved from many locations. In virtually all cases the system components have functioned as intended and data have been successfully collected and transmitted for review. Comparisons between front-end-triggered video and time-lapse video have shown that the triggered record has captured all relevant monitored operations at the various nuclear facilities included in the field trials. We believe the utility and functional reliability of remote monitoring for international safeguards has been shown. However, it should be kept in mind that openness and transparency, including some form of short-notice inspections, are likely to be prerequisites to the safeguards implementation of remote monitoring in any State

  12. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  13. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  14. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ...-term maintenance. (3) Corrective action for all baghouses applied to pushing emissions. In the event a... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my operation and maintenance... Battery Stacks Operation and Maintenance Requirements § 63.7300 What are my operation and maintenance...

  15. Plutonium production in a remote automated cell

    International Nuclear Information System (INIS)

    Maddux, E.P.; Purcell, J.A.

    1987-01-01

    Production of 239 Pu metal has traditionally been carried out in glove box enclosures to protect operating personnel and the outside environment from the hazards of radiation. With the advent of more stringent federal regulations for protecting personnel, the environment, and security of special nuclear materials, it is proposed that plutonium be processed in a totally remote environment using automated work stations and robotic materials transfer and equipment maintenance. Investigators envision a facility where operations are carried out in two remotely operated cells. One cell will contain aqueous processing operations while the second will contain powder operations. Various processing steps will be carried out on modular frames of a standard configuration. The processing equipment on each frame will be completely automated and operated via computer. Nonaqueous materials will be transferred between frames by robots using closed-circuit television and computer control. Robots will be able to perform limited in-place maintenance of equipment on each frame for high-maintenance replaceable components. When major repair is required, the processing frame will be decoupled by the robot and moved to a decontamination and maintenance area by a conventional overhead bridge crane. The new design concept will provide for long-term goals, which include exposure reduction, near-real time accountability, safeguards, and waste reduction

  16. 40 CFR 63.1447 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... corrective action according to written procedures specified in your operation and maintenance plan to... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my operation and maintenance... Maintenance Requirements § 63.1447 What are my operation and maintenance requirements? (a) As required by § 63...

  17. Remote dismantlement tasks for the CP5 reactor: Implementation, operations, and lessons learned

    International Nuclear Information System (INIS)

    Noakes, M.W.

    1998-01-01

    This paper presents a developer's perspective on lessons learned from one example of the integration of new prototype technology into a traditional operations environment. The dual arm work module was developed by the Robotics Technology Development Program as a research and development activity to examine manipulator controller modes and deployment options. It was later reconfigured for the dismantlement of the Argonne National Laboratory Chicago Pile number-sign 5 reactor vessel as the crane-deployed dual arm work platform. Development staff worked along side operations staff during a significant part of the deployment to provide training, maintenance, and tooling support. Operations staff completed all actual remote dismantlement tasks. At the end of available development support funding, the Dual Arm Work Platform was turned over to the operations staff, who is still using it to complete their dismantlement tasks

  18. Retrieval operators of remote sensing applications

    International Nuclear Information System (INIS)

    Ahmad, T.; Shah, A.

    2014-01-01

    A set of operators of remote sensing applications have been proposed to fulfill most of the Functional Requirements (FR). These operators capture the functions of the applications, which can be considered as the services provided by the applications. In general, a good application meets maximum FR from user. In this paper, we have defined a remote sensing application by a set, having all images created at dissimilar time instances, and each image is categorized into set of different layers. (author)

  19. Transfer of technology in maintenance tools

    International Nuclear Information System (INIS)

    Delorme, H.; Cartry, J.P.

    1985-10-01

    For maximum reliability of maintenance operations, FRAMATOME has aimed to improve the accessibility of highly irradiated and contaminated reactor coolant system equipment by the active promotion of an automation and robotization strategy. A number of robot designs have been developed providing replacement of operators inside the steam generator channel head, smooth handling of heavy or cumbersome objects in this zone, easy marking of steam generator tubes and increased speed of repetitive channel head operations: maintenance spider, theta-theta prime robotic service arm, R-theta robotic service arm, remote manipulator arm. Two operations are described: channel head folding cover plate and, operation of the torquing machine for head cover plate

  20. Future-oriented maintenance strategy based on automated processes is finding its way into large astronomical facilities at remote observing sites

    Science.gov (United States)

    Silber, Armin; Gonzalez, Christian; Pino, Francisco; Escarate, Patricio; Gairing, Stefan

    2014-08-01

    With expanding sizes and increasing complexity of large astronomical observatories on remote observing sites, the call for an efficient and recourses saving maintenance concept becomes louder. The increasing number of subsystems on telescopes and instruments forces large observatories, like in industries, to rethink conventional maintenance strategies for reaching this demanding goal. The implementation of full-, or semi-automatic processes for standard service activities can help to keep the number of operating staff on an efficient level and to reduce significantly the consumption of valuable consumables or equipment. In this contribution we will demonstrate on the example of the 80 Cryogenic subsystems of the ALMA Front End instrument, how an implemented automatic service process increases the availability of spare parts and Line Replaceable Units. Furthermore how valuable staff recourses can be freed from continuous repetitive maintenance activities, to allow focusing more on system diagnostic tasks, troubleshooting and the interchanging of line replaceable units. The required service activities are decoupled from the day-to-day work, eliminating dependencies on workload peaks or logistic constrains. The automatic refurbishing processes running in parallel to the operational tasks with constant quality and without compromising the performance of the serviced system components. Consequentially that results in an efficiency increase, less down time and keeps the observing schedule on track. Automatic service processes in combination with proactive maintenance concepts are providing the necessary flexibility for the complex operational work structures of large observatories. The gained planning flexibility is allowing an optimization of operational procedures and sequences by considering the required cost efficiency.

  1. Multicriteria selection in concept design of a divertor remote maintenance port in the EU DEMO reactor using an AHP participative approach

    Energy Technology Data Exchange (ETDEWEB)

    Carfora, D. [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Gironimo, G. Di, E-mail: giuseppe.digironimo@unina.it [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Esposito, G. [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Huhtala, K. [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Määttä, T.; Mäkinen, H. [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland); Miccichè, G. [ENEA Brasimone, I:40032 Camugnano (Italy); Mozzillo, R. [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy)

    2016-11-15

    Highlights: • Concept Studies in Divertor Remote Handling. • Prioritization of concept alternatives. • Comparison and evaluation of product alternatives using AHP. - Abstract: The work behind this paper took place in the Eurofusion remote maintenance system project (WPRM) for the EU Demonstration Fusion Power Reactor (DEMO). Following ITER, the aim of DEMO is to demonstrate the capability of generating several hundreds of MW of net electricity by 2050. The main objective of this paper was the study of the most efficient design of the maintenance port for replacing the divertor cassettes in a Remote Handling (RH) point of view. In DEMO overall design, one important consideration is the availability and short down time operations. The inclination of the divertor port has a very important impact on all the RH tasks such as the design of the divertor mover, the divertor locking systems and the end effectors. The current reference scenario of the EU DEMO foresees a 45° inclined port for the remote maintenance (RM) of the divertor in the lower part of the reactor. Nevertheless, in the optic of the systems engineering (SE) approach, in early concept design phase, all possible configurations shall be taken into account. Even the solutions which seem not feasible at all need to be investigated, because they could lead to new and innovative engineering proposals. The different solutions were compared using an approach based on the Analytic Hierarchy Process (AHP). The technique is a multi-criteria decision making approach in which the factors that are important in making a decision are arranged in a hierarchic structure. The results of these studies show how the application of the AHP improved and focused the selection on the concept which is closer to the requirements arose from technical meetings with the experts of the RH field.

  2. Multicriteria selection in concept design of a divertor remote maintenance port in the EU DEMO reactor using an AHP participative approach

    International Nuclear Information System (INIS)

    Carfora, D.; Gironimo, G. Di; Esposito, G.; Huhtala, K.; Määttä, T.; Mäkinen, H.; Miccichè, G.; Mozzillo, R.

    2016-01-01

    Highlights: • Concept Studies in Divertor Remote Handling. • Prioritization of concept alternatives. • Comparison and evaluation of product alternatives using AHP. - Abstract: The work behind this paper took place in the Eurofusion remote maintenance system project (WPRM) for the EU Demonstration Fusion Power Reactor (DEMO). Following ITER, the aim of DEMO is to demonstrate the capability of generating several hundreds of MW of net electricity by 2050. The main objective of this paper was the study of the most efficient design of the maintenance port for replacing the divertor cassettes in a Remote Handling (RH) point of view. In DEMO overall design, one important consideration is the availability and short down time operations. The inclination of the divertor port has a very important impact on all the RH tasks such as the design of the divertor mover, the divertor locking systems and the end effectors. The current reference scenario of the EU DEMO foresees a 45° inclined port for the remote maintenance (RM) of the divertor in the lower part of the reactor. Nevertheless, in the optic of the systems engineering (SE) approach, in early concept design phase, all possible configurations shall be taken into account. Even the solutions which seem not feasible at all need to be investigated, because they could lead to new and innovative engineering proposals. The different solutions were compared using an approach based on the Analytic Hierarchy Process (AHP). The technique is a multi-criteria decision making approach in which the factors that are important in making a decision are arranged in a hierarchic structure. The results of these studies show how the application of the AHP improved and focused the selection on the concept which is closer to the requirements arose from technical meetings with the experts of the RH field.

  3. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  4. Functional Problems and Maintenance Operations of Hydraulic Turbines

    Directory of Open Access Journals (Sweden)

    Liliana Topliceanu

    2016-02-01

    Full Text Available The exploitation in good conditions of the hydroelectric power plant imposes a rigorous maintenance of equipment and operating facilities, primarily of the turbine. The efficiency of the turbine is strongly affected by any defects which could occur during the operation. The paper makes a synthesis of the most frequent failures which have occurred during the functioning of Kaplan turbines plant and the required maintenance plan that has to be adopted. The maintenance rules for the optimal working of these turbines are also emphasized.

  5. Working underwater: new Remotely Operated Vehicles (ROVs) tackle subsea economics

    Energy Technology Data Exchange (ETDEWEB)

    1958-01-01

    Modular construction is helping to cut remotely operated vehicle (ROV) costs, while work performance is improved by techniques for holding the vehicles onstation. The upper power house contains the propulsion units and electronics, with work modules slung beneath. The solution of a long standing problem of how to hold the maintenance unit steady against a jacket or similar tubular structure has led to two methods currently undergoing testing. The first employs suction and uses a hydraulic clamp; the second fits the ROV with massive mechanical grabs. The new technology saves diving time as well as costs. Other advances are self-propelled ROVs,the use of miniature low-light color TV cameras, and a free-swimming ROV for use where ice may be a problem. 5 figures.

  6. Remote supervision of GIS monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Pannunzio, J.; Juge, P.; Ficheux, A.; Rayon, J.L. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada)

    2007-07-01

    Operators of gas-insulated substations (GIS) are increasingly concerned with failure prevention, scheduled maintenance, personnel safety and shortage of maintenance crews. Until recently, the density levels of the insulating gas sulfur hexafluoride (SF6) was the only parameter controlled in gas-insulated substations. Modern digital type control and monitoring equipment have been widely used in the past decade. Remote indication of gas density and status of dynamic components was made possible and shown on local control panels. Modern GIS monitoring systems offer features such as SF6 monitoring, SF6 leakage trends, internal arc localization and detection. The required information is recorded in a local computer and displaced onto a local human machine interface (HMI) or a local industrial PC mounted next to the GIS. These monitoring systems are used as decision making tools to facilitate maintenance activities and optimize the management of assets. This paper presented the latest developments in digital monitoring systems in terms of modern digital architecture; management of information flows between monitoring systems and control systems; operation of remote supervision; configuration of high voltage substations and information sharing; and, types of links between GIS room and remote supervision. This paper also demonstrated what can be achieved by moving the central HMI of a GIS monitoring system to the decision-making centres. It was shown that integrated features that allow remote on-line or automated management have reached an acceptable level of reliability and comfort for operators. 5 figs.

  7. Development of a standard methodology for optimizing remote visual display for nuclear-maintenance tasks

    International Nuclear Information System (INIS)

    Clarke, M.M.; Garin, J.; Preston-Anderson, A.

    1981-01-01

    The aim of the present study is to develop a methodology for optimizing remote viewing systems for a fuel recycle facility (HEF) being designed at Oak Ridge National Laboratory (ORNL). An important feature of this design involves the Remotex concept: advanced servo-controlled master/slave manipulators, with remote television viewing, will totally replace direct human contact with the radioactive environment. Therefore, the design of optimal viewing conditions is a critical component of the overall man/machine system. A methodology has been developed for optimizing remote visual displays for nuclear maintenance tasks. The usefulness of this approach has been demonstrated by preliminary specification of optimal closed circuit TV systems for such tasks

  8. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  9. Development of a standard methodology for optimizing remote visual display for nuclear maintenance tasks

    Science.gov (United States)

    Clarke, M. M.; Garin, J.; Prestonanderson, A.

    A fuel recycle facility being designed at Oak Ridge National Laboratory involves the Remotex concept: advanced servo-controlled master/slave manipulators, with remote television viewing, will totally replace direct human contact with the radioactive environment. The design of optimal viewing conditions is a critical component of the overall man/machine system. A methodology was developed for optimizing remote visual displays for nuclear maintenance tasks. The usefulness of this approach was demonstrated by preliminary specification of optimal closed circuit TV systems for such tasks.

  10. Safety of nuclear operation and maintenance

    International Nuclear Information System (INIS)

    Mori, M.; Nitta, T.; Sakai, K.

    1994-01-01

    The Kansai Electric Power Co. Inc.(Kansai EPC) aims to pursue a high quality and highly reliable operation in nuclear power generation in order to ensure safety by reducing the risk of accidents and win the confidence from the society and the public. It is emphasised that in order to realize this aim manufacturers and contractors cooperate with each other in performing high quality maintenance through plant lifetime maintenance system. TQC (Total Quality Control) activity enhances the motivation for each individual to have a quality-oriented mind and cultivate the safety culture. Under the lifetime employment practice, Kansai EPC and maintenance contractors can conduct systematic education and training, and the Maintenance Training Center helps to make it effective. 6 figs

  11. Application of advanced remote systems technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been advancing the technology of remote handling and remote maintenance for in-cell systems planned for future nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor is directly applicable to the proposed in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The application of teleoperated, force-reflecting servomanipulators with television viewing could be a major step forward in waste handling facility design. Primary emphasis in the current program is the operation of a prototype remote handling and maintenance system, the advanced servomanipulator (ASM), which specifically addresses the requirements of fuel reprocessing and waste handling with emphasis on force reflection, remote maintainability, reliability, radiation tolerance, and corrosion resistance. Concurrent with the evolution of dexterous manipulators, concepts have also been developed that provide guidance for standardization of the design of the remotely operated and maintained equipment, the interface between the maintenance tools and the equipment, and the interface between the in-cell components and the facility

  12. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2009-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based lifecycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue, corrosion...

  13. Evaluating ITER remote handling middleware concepts

    NARCIS (Netherlands)

    Koning, J. F.; Heemskerk, C. J. M.; Schoen, P.; Smedinga, D.; Boode, A. H.; Hamilton, D. T.

    2013-01-01

    Remote maintenance activities in ITER will be performed by a unique set of hardware systems, supported by an extensive software kit. A layer of middleware will manage and control a complex set of interconnections between teams of operators, hardware devices in various operating theatres, and

  14. High-definition television evaluation for remote handling task performance

    International Nuclear Information System (INIS)

    Fujita, Y.; Omori, E.; Hayashi, S.; Draper, J.V.; Herndon, J.N.

    1986-01-01

    In a plant that employs remote handling techniques for equipment maintenance, operators perform maintenance tasks primarily by using the information from television systems. The efficiency of the television system has a significant impact on remote maintenance task performance. High-definition television (HDTV) transmits a video image with more than twice the number of horizontal scan lines as standard-resolution television (1125 for HDTV to 525 for standard-resolution NTSC television). The added scan lines dramatically improve the resolution of images on the HDTV monitors. This paper describes experiments designed to evaluate the impact of HDTV on the performance of typical remote tasks. The experiments described in this paper compared the performance of four operators using HDTV with their performance while using other television systems. The experiments included four television systems: (a) high-definition color television, (b) high-definition monochromatic television, (c) standard-resolution monochromatic television, and (d) standard-resolution stereoscopic monochromatic television

  15. ITER - TVPS remote handling critical design issues

    International Nuclear Information System (INIS)

    1990-09-01

    This report describes critical design issues concerning remote maintenance of the ITER Torus Vacuum Pumping System (TVPS). The key issues under investigation are the regeneration/isolation valve seal and seal mechanism replacement; impact of inert gas operation; impact of remote handling (RH) on the building configuration and RH equipment requirements. Seal exchange concepts are developed and their impact on the valve design identified. Concerns regarding the design and operation of RH equipment in an inert gas atmosphere are also explored. The report compares preliminary RH equipment options, pumping equipment maintenance frequency and their impact on the building design, and makes recommendations where a conflict exists between pumping equipment and the building layout. (51 figs., 11 refs.)

  16. Development of a zonal applicability tool for remote handling equipment in DEMO

    Energy Technology Data Exchange (ETDEWEB)

    Madzharov, Vladimir, E-mail: vladimir.madzharov@kit.edu [Karlsruhe Institute of Technology, Institute for Material Handling and Logistics, Karlsruhe (Germany); Mittwollen, Martin [Karlsruhe Institute of Technology, Institute for Material Handling and Logistics, Karlsruhe (Germany); Leichtle, Dieter [Fusion for Energy F4E, Barcelona (Spain); Hermon, Gary [Culham Center for Fusion Energy, Culham Science Centre, OX14 3DB Abingdon (United Kingdom)

    2015-10-15

    Highlights: • Radiation-hardness assessment of remote handling (RH) components used in DEMO. • A radiation assessment tool for supporting remote handling engineers. • Connecting data from the radiation field analysis to the radiation hardness data. • Output is the expected lifetime of the selected RH component used for maintenance. - Abstract: A radiation-induced damage caused by the ionizing radiation can induce a malfunctioning of the remote handling equipment (RHE) used during maintenance in fusion power plants, other nuclear power stations and high-energy accelerators facilities like e.g. IFMIF. Therefore to achieve a sufficient length of operational time inside future fusion power plants, a suitable radiation tolerant RHE for maintenance operations in radiation environments is inevitably required. To assess the influence of the radiation on remote handling equipment (RHE), an investigation about radiation hardness assessment of typically used RHE components, has been performed. Additionally, information about the absorbed total dose that every component can withstand before failure was collected. Furthermore, the development of a zonal applicability tool for supporting RHE designers has been started using Excel VBA. The tool connects the data from the radiation field analysis (3-D radiation map) to the radiation hardness data of the planned RHE for DEMO remote maintenance. The intelligent combination of the available information for the radiation behaviour and radiation level at certain time and certain location may help with the taking of decisions about the application of RHE in radiation environment. The user inputs the following parameters: the specific device used in the RHE, the planned location and the maintenance period. The output is the expected lifetime of the selected RHE component at the given location and maintenance period. Planned action times have to be also considered. After having all the parameters it can be decided, if specific RHE

  17. 40 CFR 63.9600 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... instructions for routine and long-term maintenance. (2) Corrective action procedures for bag leak detection... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What are my operation and maintenance... and Maintenance Requirements § 63.9600 What are my operation and maintenance requirements? (a) As...

  18. Communication links for fusion reactor maintenance operations

    International Nuclear Information System (INIS)

    Van Uffelen, M.

    2005-01-01

    Different architectures are envisaged for data transmission with fibre optic links in a radiation environment, as proposed in literature for both space and high energy physics applications. Their needs and constraints differ from those encountered for maintenance tasks in the future ITER environment, not only in terms of temperature and radiation levels, but also with respect to transmission speed requirements. Our approach attempts to limit the use of radiation-sensitive electronics for transmission of both digital and/or analogue data to the control room, using glass fibres as transport medium. We therefore assessed the radiation behaviour of a cost-effective fibre optic transmitter at 850 nm, consisting of a PWM (pulse width modulator), a radiation tolerant current driver (previously developed at SCK-CEN) and a VCSEL (Vertical-Cavity Surface Emitting Laser assembly, up to 10 MGy at 60 degrees Celsius. The PWM enables to transform an analogue sensor signal into a pseudo numerical signal, with a pulse width proportional to the incoming signal. The main objective of this task is to contribute to the major design of the maintenance equipment and strategy needed for the remote replacement of the divertor system in the future ITER fusion reactor, with particular attention to the implications of radiation hardening rules and recommendations. Next to the radiation assessment studies of remote handling tools, including actuators and sensors, we also develop radiation tolerant communication links with multiplexing capabilities

  19. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  20. Industrial applications for remote operation in a processing plant

    International Nuclear Information System (INIS)

    Hermier, J.; Le Guennec, R.

    1984-01-01

    In the first part of this article, J. Hermier covers the use of remote handling equipment in the UP2-400 plant at La Hague near Cherbourg, in which for the most part master/slave mechanism remote handling units are used with a number of these employed in daily processing operations. As regards this subject, it is useful to remember that, at the time of the designing of this plant (UP2-400), this was the only equipment available on the market with remote-controlled remote handling equipment. In the second part, before speaking about the development of remote operation equipment in the plants now under construction and attempting to project what might be the remote operation role in future plants, R. Le Guennec reviews the problems faced by engineering in designing industrial-sized processing plants and, consequently, the motivations of engineering when faced with a choice between several possible solutions [fr

  1. Multi-canister overpack operations and maintenance manual

    International Nuclear Information System (INIS)

    PIERCE, S.R.

    1999-01-01

    This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures

  2. Development of remote handling techniques for the HLLW solidification plant

    International Nuclear Information System (INIS)

    Tosha, Yoshitsugu; Iwata, Toshio; Inada, Eiichi; Nagaki, Hiroshi; Yamamoto, Masao

    1982-01-01

    To develop the techniques for the remote maintenance of the equipment in a HLLW (high-level liquid waste) solidification plant, the mock-up test facility (MTF) has been designed and constructed. Before its construction, the specific mock-up equipment was manufactured and tested. The results of the test and the outline of the MTF are described. As the mock-up equipment, a denitrater-concentrator, a ceramic melter and a canister handling equipment were selected. Remote operation was performed according to the maintenance program, and the evaluation of the component was conducted on the easiness of operation, performance, and the suitability to remote handling equipment. As a result of the test, four important elements were identified; they were guides, lifting fixtures, remote handling bolts, and remote pipe connectors. Many improvements of these elements were achieved, and reflected in the design of the MTF. The MTF is a steel-framed and slate-covered building (25 mL x 20 mW x 27 mH) with five storys of test bases. It contains the following four main systems: pretreatment and off-gas treatment system, glass melting system, canister handling system and secondary waste liquid recovery system. Further development of the remote maintenance techniques is expected through the test in the MTF. (Aoki, K.)

  3. 24 CFR 1006.325 - Maintenance, management and efficient operation.

    Science.gov (United States)

    2010-04-01

    ... § 1006.325 Maintenance, management and efficient operation. (a) Written policies. The DHHL must develop... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maintenance, management and efficient operation. 1006.325 Section 1006.325 Housing and Urban Development Regulations Relating to Housing...

  4. Reliability analysis of maintenance operations for railway tracks

    International Nuclear Information System (INIS)

    Rhayma, N.; Bressolette, Ph.; Breul, P.; Fogli, M.; Saussine, G.

    2013-01-01

    Railway engineering is confronted with problems due to degradation of the railway network that requires important and costly maintenance work. However, because of the lack of knowledge on the geometrical and mechanical parameters of the track, it is difficult to optimize the maintenance management. In this context, this paper presents a new methodology to analyze the behavior of railway tracks. It combines new diagnostic devices which permit to obtain an important amount of data and thus to make statistics on the geometric and mechanical parameters and a non-intrusive stochastic approach which can be coupled with any mechanical model. Numerical results show the possibilities of this methodology for reliability analysis of different maintenance operations. In the future this approach will give important informations to railway managers to optimize maintenance operations using a reliability analysis

  5. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  6. Design of casks: incorporating operational feedback from maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bimet, F.; Hartenstein, M. [COGEMA Logistics, Saint Quentin (France)

    2004-07-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible.

  7. Design of casks: incorporating operational feedback from maintenance

    International Nuclear Information System (INIS)

    Bimet, F.; Hartenstein, M.

    2004-01-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible

  8. Operation and maintenance cost data for residential photovoltaic modules/panels

    Science.gov (United States)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-01-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  9. A software environment to execute automatic operational sequences on the ITER-FEAT DTP facility

    International Nuclear Information System (INIS)

    Fermani, G.; Zarfino, M.

    2001-01-01

    The divertor test platform (DTP) maintenance operations are carried out by means of the remote handling equipments (RHE), each dedicated to perform a set of specialised remote actions. Each RHE is controlled by an RHE control system (RHE-CS) and can be locally operated by an RHE-operator using the local control panel (LOP). To perform the maintenance activity, the DTP-operator coordinates the remote operations of every RHEs, using the supervisory system (DTP S S). Because the remote maintenance activities demand for a high degree of parallelism, automation and cooperation between various RHEs, the development of a software environment (OSAExE) that had the indicated characteristics has been necessary. The OSAExE environment is applicable to any distributed and cooperating system that is modelled as a set of autonomous subsystems. Each maintenance remote sequence needs to be modelled as a modified Petri-net diagram and subsequently 'compiled', in order to be automatically executed on OSAExE environment. The OSAExE architecture allows both, to program 'event driven' automatic sequences, and to maintain unchanged all the existing DTP S S features

  10. Marginal costs for road maintenance and operation - a cost function approach

    OpenAIRE

    Haraldsson, Mattias

    2007-01-01

    Using observational data covering the whole Swedish national road network for the period 1998-2002, this paper estimates a set of maintenance and operation cost functions. It is found that costs for all operation and maintenance measures increase with traffic intensity, with two exceptions; total operation and winter operation measures are fixed cost activities. All other operation and maintenance measures have short run elasticities in the range 0.25-0.60. The impact of an additional vehicle...

  11. NET remote workstation

    International Nuclear Information System (INIS)

    Leinemann, K.

    1990-10-01

    The goal of this NET study was to define the functionality of a remote handling workstation and its hardware and software architecture. The remote handling workstation has to fulfill two basic functions: (1) to provide the man-machine interface (MMI), that means the interface to the control system of the maintenance equipment and to the working environment (telepresence) and (2) to provide high level (task level) supporting functions (software tools) during the maintenance work and in the preparation phase. Concerning the man-machine interface, an important module of the remote handling workstation besides the standard components of man-machine interfacing is a module for graphical scene presentation supplementing viewing by TV. The technique of integrated viewing is well known from JET BOOM and TARM control using the GBsim and KISMET software. For integration of equipment dependent MMI functions the remote handling workstation provides a special software module interface. Task level support of the operator is based on (1) spatial (geometric/kinematic) models, (2) remote handling procedure models, and (3) functional models of the equipment. These models and the related simulation modules are used for planning, programming, execution monitoring, and training. The workstation provides an intelligent handbook guiding the operator through planned procedures illustrated by animated graphical sequences. For unplanned situations decision aids are available. A central point of the architectural design was to guarantee a high flexibility with respect to hardware and software. Therefore the remote handling workstation is designed as an open system based on widely accepted standards allowing the stepwise integration of the various modules starting with the basic MMI and the spatial simulation as standard components. (orig./HP) [de

  12. Expert operator preferences in remote manipulator control systems

    International Nuclear Information System (INIS)

    Sundstrom, E.; Draper, J.V.; Fausz, A.; Woods, H.

    1995-06-01

    This report describes a survey of expert remote manipulator operators designed to identify features of control systems related to operator efficiency and comfort. It provides information for designing the control center for the Single-Shell Tank Waste Retrieval Manipulator System (TWRMS) Test Bed, described in a separate report. Research questions concerned preferred modes of control, optimum work sessions, sources of operator fatigue, importance of control system design features, and desired changes in control rooms. Participants comprised four expert remote manipulator operators at Oak Ridge National Laboratory, who individually have from 9 to 20 years of experience using teleoperators. The operators had all used rate and position control, and all preferred bilateral (force-reflecting) position control. They reported spending an average of 2.75 h in control of a teleoperator system during a typical shift. All were accustomed to working in a crew of two and alternating control and support roles in 2-h rotations in an 8-h shift. Operators reported that fatigue in using remote manipulator systems came mainly from watching TV monitors and making repetitive motions. Three of four experienced symptoms, including headaches and sore eyes, wrists, and back. Of 17 features of control rooms rated on importance, highest ratings went to comfort and support provided by the operator chair, location of controls, location of video monitors, video image clarity, types of controls, and control modes. When asked what they wanted to change, operators said work stations designed for comfort; simpler, lighter hand-controls; separate controls for each camera; better placement of remote camera; color monitors; and control room layouts that support crew interaction. Results of this small survey reinforced the importance of ergonomic factors in remote manipulation

  13. Developing and operating a remotely operated work system in hostile and emergency environments

    International Nuclear Information System (INIS)

    Thorne, P.M.

    1987-01-01

    The author presents an overview of the factors that a project manager considering the use of remote work systems must keep in mind during the planning and execution of operations in hostile environments. Interfacing of the remote work system to the task and understanding mission parameters is emphasized. The author's thesis is based on many years of technical operations and project management roles using remote work systems in the subsea oil industry, military and, most recently, space and nuclear applications

  14. Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations

    International Nuclear Information System (INIS)

    Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation's first and world's largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage

  15. Proceedings of the international topical meeting on remote systems and robotics in hostile environments

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This book contains the proceedings of the International Topical Meeting on Remote Systems and Robotics in Hostile Environments. It is organized under the following sessions: Worldwide Applications Overview; Operating Mobile Systems; Sensors and Control Systems; Space Applications; Reactor Operations and Surveillance; Remote Equipment for Hazardous Operations; Future Mobile System; Mining and Construction Operations; Special Applications; Hot Cell Applications; Processing; Reactor Operations and Maintenance; Decontamination and Waste Handling; Remote Handling Development and Demonstration

  16. Remotely operated top loading filter housing

    International Nuclear Information System (INIS)

    Ross, M.J.; Carter, J.A.

    1989-01-01

    A high-efficiency particulate air (HEPA) filter system was developed for the Fuel Processing Facility at the Idaho Chemical Processing Plant. The system utilizes commercially available HEPA filters and allows in-cell filters to be maintained using operator-controlled remote handling equipment. The remote handling tasks include transport of filters before and after replacement, removal and replacement of the filter from the housing, and filter containment

  17. 38th Annual Maintenance & Operations Cost Study for Colleges

    Science.gov (United States)

    Agron, Joe

    2009-01-01

    The nation's colleges are feeling the pinch of the economic downturn, and maintenance and operations (M&O) budgets especially are under pressure. This article presents data from the 38th annual Maintenance & Operations Cost Study for colleges that can help one in benchmarking expenditures at one's institution. Data provided only targets two-year…

  18. 38th Annual Maintenance & Operations Cost Study for Schools

    Science.gov (United States)

    Agron, Joe

    2009-01-01

    Despite the worst economic environment in generations, spending by K-12 institutions on maintenance and operations (M&O) held its own--defying historical trends that have shown M&O spending among the most affected in times of budget tightening. This article presents data from the 38th annual Maintenance & Operations Cost Study for…

  19. The ITER EC H and CD Upper Launcher: Analysis of vertical Remote Handling applied to the BSM maintenance

    International Nuclear Information System (INIS)

    Grossetti, Giovanni; Aiello, Gaetano; Heemskerk, Cock; Elzendoorn, Ben; Geßner, Robby; Koning, Jarich; Meier, Andreas; Ronden, Dennis; Späh, Peter; Scherer, Theo; Schreck, Sabine; Strauß, Dirk; Vaccaro, Alessandro

    2013-01-01

    This paper deals with Remote Handling activities foreseen on the Blanket Shield Module, the plasma facing component of the ITER Electron Cyclotron Heating and Current Drive Upper Launcher. The maintenance configuration considered here is the Vertical Remote Handling, meaning gravity acting along the launcher radial axis. The plant, where the maintenance under consideration is occurring, is the Hot Cell Facility Work Cell. The study here reported has been carried out within the presently ongoing EFDA Goal Oriented Training program on Remote Handling (GOT-RH), which aims to support ITER activities. This document and its contents have to be considered as part of a more vast RAMI analysis to be developed within the GOT-RH, which aims to maximize the Electron Cyclotron Heating and Current Drive system availability. The Baseline CAD model of the Electron Cyclotron Heating and Current Drive Upper Launcher is currently in its preliminary design phase and does not provide enough details for developing a fully detailed maintenance strategy. Therefore, through a System Engineering approach, a set of assumptions was conceived on the launcher structure, as a basis for development of a Remote Handling strategy. Moreover, to compare different design solutions related to the possibility of integrating a quasi-optical component into the Blanket Shield Module, a Trade-Off was made, and its contents are shown here. The outcome of this System Engineering approach has been formalized into Task Definition Forms whose contents are reported here. The Remote Handling strategy presented in this work will be tested in the near future both through Virtual Reality simulations and through prototype experiments

  20. The ITER EC H and CD Upper Launcher: Analysis of vertical Remote Handling applied to the BSM maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Grossetti, Giovanni, E-mail: giovanni.grossetti@kit.edu [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Aiello, Gaetano [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Heemskerk, Cock [Heemskerk Innovative Technology, Merelhof 2, 2172 HZ Sassenheim (Netherlands); Elzendoorn, Ben [FOM Institute DIFFER, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Geßner, Robby [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Koning, Jarich [Heemskerk Innovative Technology, Merelhof 2, 2172 HZ Sassenheim (Netherlands); Meier, Andreas [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Ronden, Dennis [FOM Institute DIFFER, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Späh, Peter; Scherer, Theo; Schreck, Sabine; Strauß, Dirk; Vaccaro, Alessandro [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany)

    2013-10-15

    This paper deals with Remote Handling activities foreseen on the Blanket Shield Module, the plasma facing component of the ITER Electron Cyclotron Heating and Current Drive Upper Launcher. The maintenance configuration considered here is the Vertical Remote Handling, meaning gravity acting along the launcher radial axis. The plant, where the maintenance under consideration is occurring, is the Hot Cell Facility Work Cell. The study here reported has been carried out within the presently ongoing EFDA Goal Oriented Training program on Remote Handling (GOT-RH), which aims to support ITER activities. This document and its contents have to be considered as part of a more vast RAMI analysis to be developed within the GOT-RH, which aims to maximize the Electron Cyclotron Heating and Current Drive system availability. The Baseline CAD model of the Electron Cyclotron Heating and Current Drive Upper Launcher is currently in its preliminary design phase and does not provide enough details for developing a fully detailed maintenance strategy. Therefore, through a System Engineering approach, a set of assumptions was conceived on the launcher structure, as a basis for development of a Remote Handling strategy. Moreover, to compare different design solutions related to the possibility of integrating a quasi-optical component into the Blanket Shield Module, a Trade-Off was made, and its contents are shown here. The outcome of this System Engineering approach has been formalized into Task Definition Forms whose contents are reported here. The Remote Handling strategy presented in this work will be tested in the near future both through Virtual Reality simulations and through prototype experiments.

  1. Verifying elementary ITER maintenance actions with the MS2 benchmark product

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Elzendoorn, B.S.Q.; Magielsen, A.J.; Schropp, G.Y.R.

    2011-01-01

    A new facility has been taken in operation to investigate the influence of visual and haptic feedback on the performance of remotely executed ITER RH maintenance tasks. A reference set of representative ITER remote handling maintenance tasks was included the master slave manipulator system (MS2) benchmark product. The benchmark product was used in task performance tests in a representative two-handed dexterous manipulation test bed at NRG. In the setup, the quality of visual feedback was varied by exchanging direct view with indirect view setups in which visual feedback is provided via video cameras. Interaction forces were measured via an integrated force sensor. The impact of feedback quality on the performance of maintenance tasks at the level of handling individual parts was measured and analysed. Remote execution of the maintenance actions took roughly 3-5 times more time than hands-on. Visual feedback was identified as the dominant factor, including aspects like (lack of) operator control over camera placement, pan, tilt and zoom, lack of 3D perception, image quality, and latency. Haptic feedback was found to be important, but only in specific contact transition and constrained motion tasks.

  2. Present status and problems of remote systems technology in nuclear industry

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    This reports the activities of Special Committee on Remote Systems Technology, Atomic Energy Society of Japan, during the period from Oct. 1984 to Sep. 1988. The Committee studied and reviewed the present status and problems of remote operation and maintenance in various fields of nuclear industry. Reported items are; reactor operation, reprocessing, nuclear fusion and decommissioning. It also reviews robotics and remote systems tehcnology applied to space and marine development.

  3. Present status and problems of remote systems technology in nuclear industry

    International Nuclear Information System (INIS)

    1989-01-01

    This reports the activities of Special Committee on Remote Systems Technology, Atomic Energy Society of Japan, during the period from Oct. 1984 to Sep. 1988. The Committee studied and reviewed the present status and problems of remote operation and maintenance in various fields of nuclear industry. Reported items are; reactor operation, reprocessing, nuclear fusion and decommissioning. It also reviews robotics and remote systems tehcnology applied to space and marine development. (author)

  4. Life Cycle Costs in Education: Operations & Maintenance Considered.

    Science.gov (United States)

    Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol

    2000-01-01

    Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)

  5. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  6. Nuclear reactor maintenance technology assessment. Final summary report, September 16, 1978-September 15, 1979

    International Nuclear Information System (INIS)

    Tesar, D.; Ohanian, M.J.; Dugan, E.T.

    1980-01-01

    Nuclear power plants have exhibited a downtime of one day in four during the past decade. For mature LWR plants, 40% of this downtime is due to forced (unexpected) outages. These outages increase the loss of revenues and increase occupational radiation exposure. In 1979, the cost of maintenance of 70 operating plants was $1 billion per year. A fully remote maintenance technology would save 70% of this cost. PWR steam generator maintenance under fully remote system technology could save $270 million a year. BWR valve maintenance with fully remote technology could save $54,000,000 a year. Benefits for 150 plants by the early 1990's would be substantially higher; the total yearly savings would amount to $1.8 billion. The PWR steam generator would save $550 million while the BWR valve problem would save $140 million. For nuclear power plant maintenance, the vendors initially took steps to redesign and improve the reliability of the reactor system. The second step was to develop special maintenance tooling. The development of a generalized robotic manipulator having greater precision, dexterity, reliability, obstacle avoidance capability and load capacity is now feasible using microelectronics and computers. In order to drive this more general slave, the master controller must also be generalized to create a man-machine interface as transparent as possible; software modules must be developed which filter jitter, change scales, automaticaly control vision systems, and adapt force feedback signals in order to enhance the speed and precision of operation of the total system. A full complement of component technologies such as sensors, actuators, end-effectors, and remote TV vision systems must also be developed. Several other energy systems represent operations where such remote systems technology may be valuable

  7. Evaluation of the revised electrolytic reduction reactor from a remote operability aspect

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyo Jik; Yoon, K. H.; Kim, K. H. (and others)

    2008-01-15

    This report presents an evaluation of the remote operability of the revised electrolytic reduction (ER) reactor installed in the ACP at KAERI. All operations have to be implemented in a fully remote manner since the ACPF is a hotcell for handling highly radioactive materials such as spent nuclear fuels. In particular, the ER process is a key process of the Advanced spent fuel Conditioning Process (ACP) and it needs a lot of other auxiliary equipment to perform it. Also, since the ER equipment is too big and complicated, and contrarily the ACPF is not big enough, and one common rail is allotted for a bridge transported servo manipulator, an in-cell crane and a gate crane, a remote handling of the ER reactor is accompanied by a difficulty for a remote operation. For an easy understanding, short overview of the ER process, the remote handling equipment, the structural configuration of the ACPF and the detail drawings of the ER equipment are presented. Through 4 month-remote operational tests, detailed operational procedures are presented along with pictures. The remote handling equipment and tools required in each operation are addressed in detail. Also, the procedure to implement each remote operation, and a task difficulty are evaluated from a remote operability aspect. All the remote tasks are distinguished according to whether a remote operation can be performed or not. Finally, partial improvement or an idea to solve the suggested problems is presented. This report will assist in modifying or scaling up the ER reactor.

  8. Operation and maintenance of offshore wind farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.; Madsen, Erik Skov; Bilberg, Arne

    The offshore wind industry is booming and larger, more efficient wind-turbines have constantly been introduced into the market. However, research within the field of the operation and maintenance (O&M) of offshore wind farms is limited as the field is still immature. In this paper, two current ma...... maintenance models - RCM and TPM - are discussed in this context. Furthermore, through a case study, the paper looks into Modularization and SSLP, as these concepts can be utilized to optimize maintenance. This is a new approach for the offshore wind industry....

  9. Maintenance, repair and operation (MRO) of shutdown facilities

    International Nuclear Information System (INIS)

    Kenny, S.

    2006-01-01

    What level of maintenance does one apply to a shutdown facility? Well it depends on who you ask. Operations staff sees facilities that have completed their useful life cycle as a cost drain while Decommissioning staff sees this as the start of a new life cycle. Based on the decommissioning plan for the particular facility the building could complete another full life cycle while under decommissioning whether it is in storage with surveillance mode or under active decommissioning. This paper will explore how you maintain a facility and systems for many years after its useful life until final decommissioning is completed. When a building is declared redundant, who looks after it until the final decommissioning end state is achieved? At the AECL, Chalk River Labs site the safe shutdown and turnover process is one key element that initiates the decommissioning process. The real trick is orchestrating maintenance, repair and operation plans for a facility that has been poorly invested in during its last years of useful life cycle. To add to that usually shutdowns are prolonged for many years beyond the expected turnover period. During this presentation I will cover what AECL is doing to ensure that the facilities are maintained in a proper state until final decommissioning can be completed. All facilities or systems travel through the same life cycle, design, construction, commissioning, operation, shutdown and demolition. As we all know, nuclear facilities add one more interesting twist to this life cycle called Decommissioning that lands between shutdown and demolition. As a facility nears the shutdown phase, operations staff loose interest in the facility and stop investing in upgrades, repairs and maintenance but continue to invest and focus on maximizing operations. Facility maintenance standards produced by the International Facility Maintenance Association (IFMA) based on a survey done every year state that 2.2% of the total operating costs for the site should be

  10. ITER - torus vacuum pumping system remote handling issues

    International Nuclear Information System (INIS)

    Stringer, J.

    1992-11-01

    This report describes design issues concerning remote maintenance of the ITER torus vacuum pumping system. Key issues under investigation in this report are bearings for inert gas operation, transporter integration options, cryopump access, gate valve maintenance frequency, tritium effects on materials, turbomolecular pump design, and remote maintenance. Alternative bearing materials are explored for inert gas operation. Encapsulated motors and rotary feedthroughs offer an alternative option where space requirements are restrictive. A number of transporter options are studied. The preferred scheme depends on the shielded reconfigured ducts to prevent streaming and activation of RH (remote handling) equipment. A radiation mapping of the cell is required to evaluate this concept. Valve seal and bellow life are critical issues and need to be evaluated, as they have a direct bearing on the provision of adequate RH equipment to meet scheduled and unscheduled maintenance outages. The limited space on the inboard side of the cryopumps for RH equipment access requires a reconfigured duct and manifold. A modified shielded duct arrangement is proposed, which would provide more access space, reduced activation of components, and the potential for improved valve seal life. Work at Mound Laboratories has shown the adverse effects of tritium on some bearing lubricants. Silicone-based lubricants should be avoided. (11 refs., 2 tabs., 31 figs.)

  11. Development of wide area environment accelerator operation and diagnostics method

    Science.gov (United States)

    Uchiyama, Akito; Furukawa, Kazuro

    2015-08-01

    Remote operation and diagnostic systems for particle accelerators have been developed for beam operation and maintenance in various situations. Even though fully remote experiments are not necessary, the remote diagnosis and maintenance of the accelerator is required. Considering remote-operation operator interfaces (OPIs), the use of standard protocols such as the hypertext transfer protocol (HTTP) is advantageous, because system-dependent protocols are unnecessary between the remote client and the on-site server. Here, we have developed a client system based on WebSocket, which is a new protocol provided by the Internet Engineering Task Force for Web-based systems, as a next-generation Web-based OPI using the Experimental Physics and Industrial Control System Channel Access protocol. As a result of this implementation, WebSocket-based client systems have become available for remote operation. Also, as regards practical application, the remote operation of an accelerator via a wide area network (WAN) faces a number of challenges, e.g., the accelerator has both experimental device and radiation generator characteristics. Any error in remote control system operation could result in an immediate breakdown. Therefore, we propose the implementation of an operator intervention system for remote accelerator diagnostics and support that can obviate any differences between the local control room and remote locations. Here, remote-operation Web-based OPIs, which resolve security issues, are developed.

  12. Development of wide area environment accelerator operation and diagnostics method

    Directory of Open Access Journals (Sweden)

    Akito Uchiyama

    2015-08-01

    Full Text Available Remote operation and diagnostic systems for particle accelerators have been developed for beam operation and maintenance in various situations. Even though fully remote experiments are not necessary, the remote diagnosis and maintenance of the accelerator is required. Considering remote-operation operator interfaces (OPIs, the use of standard protocols such as the hypertext transfer protocol (HTTP is advantageous, because system-dependent protocols are unnecessary between the remote client and the on-site server. Here, we have developed a client system based on WebSocket, which is a new protocol provided by the Internet Engineering Task Force for Web-based systems, as a next-generation Web-based OPI using the Experimental Physics and Industrial Control System Channel Access protocol. As a result of this implementation, WebSocket-based client systems have become available for remote operation. Also, as regards practical application, the remote operation of an accelerator via a wide area network (WAN faces a number of challenges, e.g., the accelerator has both experimental device and radiation generator characteristics. Any error in remote control system operation could result in an immediate breakdown. Therefore, we propose the implementation of an operator intervention system for remote accelerator diagnostics and support that can obviate any differences between the local control room and remote locations. Here, remote-operation Web-based OPIs, which resolve security issues, are developed.

  13. Analysis and validation center for ITER RH maintenance scenarios in a virtual environment

    International Nuclear Information System (INIS)

    Elzendoorn, B.S.Q.; Baar, M. de; Hamilton, D.; Heemskerk, C.J.M.; Koning, J.F.; Ronden, D.M.S.

    2012-01-01

    A facility for detailed simulation of maintenance processes in the ITER Hot Cell Facility (HCF) has been taken into operation. The facility mimics the Remote Handling (RH) work-cells as are presently foreseen. Novel virtual reality (VR) technology, extended with a physics engine is used to create a realistic setting in which a team of Remote Handling (RH) operators can interact with a virtual Hot Cell environment. The physics engine is used to emulate the Hot Cell behavior and to provide tactile feed-back of the (virtual) slave. Multi-operator maintenance scenarios can be developed and tested in virtual reality. Complex interactions between the RH operators and the HCF control system software will be tested. Task performance will be quantified and operational resource consumption will be estimated.

  14. Analysis and validation center for ITER RH maintenance scenarios in a virtual environment

    Energy Technology Data Exchange (ETDEWEB)

    Elzendoorn, B.S.Q., E-mail: B.S.Q.Elzendoorn@rijnhuizen.nl [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE, Nieuwegein (Netherlands); Baar, M. de [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE, Nieuwegein (Netherlands); Hamilton, D. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul-lez-Durance Cedex (France); Heemskerk, C.J.M. [Heemskerk Innovative Technology, Sassenheim (Netherlands); Koning, J.F.; Ronden, D.M.S. [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE, Nieuwegein (Netherlands)

    2012-03-15

    A facility for detailed simulation of maintenance processes in the ITER Hot Cell Facility (HCF) has been taken into operation. The facility mimics the Remote Handling (RH) work-cells as are presently foreseen. Novel virtual reality (VR) technology, extended with a physics engine is used to create a realistic setting in which a team of Remote Handling (RH) operators can interact with a virtual Hot Cell environment. The physics engine is used to emulate the Hot Cell behavior and to provide tactile feed-back of the (virtual) slave. Multi-operator maintenance scenarios can be developed and tested in virtual reality. Complex interactions between the RH operators and the HCF control system software will be tested. Task performance will be quantified and operational resource consumption will be estimated.

  15. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  16. Design for maintenance during operation

    International Nuclear Information System (INIS)

    Barton, P.H.; Lyerly, H.D.

    1976-01-01

    Design of a nuclear power plant for safe, reliable and efficient operation involves much more than theory, regulations, regulatory guides, procedures, inspectors, and even quality assurance. It also involves a full knowledge and understanding of the activities which must be carried out to operate and maintain the plant. It must be remembered that a nuclear power plant is different from fossil designs and the designer must constantly keep in mind that access by people to every component is required for maintenance

  17. Plutonium production in a remote cell

    International Nuclear Information System (INIS)

    Maddux, E.P.; Purcell, J.A.

    1987-01-01

    Production of 239 Pu metal has traditionally been carried out in glovebox enclosures for protection of operating personnel and the environment. With the advent of more stringent federal regulations for protecting personnel, the environment, and security of special nuclear materials, it is proposed that plutonium be processed in a totally remote environment using automated work stations and robotic materials transfer and equipment maintenance. At the Savannah River Plant, the existing plutonium production facility is a batch-type glovebox operation built in the 1950s. A viable alternative to restoration of the existing glovebox operation is to provide a facility that uses remote cell operation

  18. 7 CFR 1767.27 - Operation and maintenance expenses.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS Uniform System of... Waterways 544Maintenance of Electric Plant 545Maintenance of Miscellaneous Hydraulic Plant Other Power....1Load Dispatch-Reliability 561.2Load Dispatch-Monitor and Operate Transmission System 561.3Load Dispatch...

  19. 49 CFR 236.919 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.919 Operations and Maintenance Manual. (a... identify all software versions, revisions, and revision dates. Plans must be legible and correct. (c...

  20. 49 CFR 236.1039 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and... software versions, revisions, and revision dates. Plans must be legible and correct. (c) Hardware, software...

  1. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of peformance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays, etc.) and the human operator. In the Remote Control Engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  2. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of performance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays) and the human operator. In the remote control engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  3. Design of Mobile Operation and Maintenance System Based on Power GIS and GPS

    Directory of Open Access Journals (Sweden)

    Jing TAO

    2017-01-01

    Full Text Available In order to solve the low efficiency of operation and maintenance and the problems of management coordination caused by the coexistence of off-line operation and maintenance and multi system coexistence in current power telecommunication operation and maintenance, this paper proposes a mobile operation and maintenance system based on power GIS and GPS location technology. The system is based on the C/S architecture, and the mobile operation and maintenance terminal is connected with the operation and maintenance management terminal through wireless and wired network. In addition to meeting basic business requirements, the system integrates power GIS functions to visually demonstrate communication resources, personnel, and failures. The staff can use the wireless mobile terminal which integrated GPS module for to operate and maintain, and can locate accurately in real time.

  4. Remote handling requirements and considerations for D-T fusion reactors

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1984-01-01

    This paper presents an overview of the maintenance considerations for next-generation fusion reactors. It draws upon the work done at the Fusion Engineering Design Center over the past several years in the conceptual development of tokamaks and tandem mirrors. It specifically addresses the maintenance philosophy adopted for these devices, the configuration development using a modular design approach, scheduled and unscheduled maintenance operations, assembly and disassembly scenarios for component replacements, maintenance equipment requirements, and the operating availability of these devices. In addition, recent work on the development of a totally remote tokamak configuration is presented

  5. Remote handling requirements and considerations for D-T fusion reactors

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1984-01-01

    This paper an overview of the maintenance considerations of next-generation fusion reactors. It draws upon the work done at the Fusion Engineering Design Center over the past several years in the conceptual development of tokamaks and tandem mirrors. It specifically addresses the maintenance philosophy adopted for these devices, the configuration development using a modular design approach, scheduled and unscheduled maintenance operations, assembly and disassembly scenarios for component replacements, maintenance equipment requirements, and the operating availability of these devices. In addition, recent work on the development of a totally remote tokamak configuration is presented

  6. Requirements for tokamak remote operation: Application to JT-60SA

    International Nuclear Information System (INIS)

    Innocente, Paolo; Barbato, Paolo; Farthing, Jonathan; Giruzzi, Gerardo; Ide, Shunsuke; Imbeaux, Frédéric; Joffrin, Emmanuel; Kamada, Yutaka; Kühner, Georg; Naito, Osamu; Urano, Hajime; Yoshida, Maiko

    2015-01-01

    Highlights: • We analyzed the data management system (DMS) appropriate for international collaboration. • We define the principal requirements for all components of the DMS. • We evaluated application of DMS requirements to the JT-60SA experiment. • We evaluated the role network bandwidth and time delay between EU and Japan. - Abstract: Remote operation and data analysis are becoming key requirements of any fusion devices. In this framework a well-conceived data management system integrated with a suite of analysis and support tools are essential components for an efficient remote exploitation of any fusion device. The following components must be considered: data archiving data model architecture; remote data and computers access; pulse schedule, data analysis software and support tools; remote control room specifications and security issues. The definition of a device-generic data model plays also important role in improving the ability to share solution and reducing learning time. As for the remote control room, the implementation of an Operation Request Gateway has been identified as an answer to security issues meanwhile remotely proving all the required features to effectively operate a device. Previous requirements have been analyzed for the new JT-60SA tokamak device. Remote exploitation is paramount in the JT-60SA case which is expected to be jointly operated between Japan and Europe. Due to the geographical distance of the two parties an optimal remote operation and remote data-analysis is considered as a key requirement in the development of JT-60SA. It this case the effects of network speed and delay have been also evaluated and tests have confirmed that the performance can vary significantly depending on the technology used.

  7. Requirements for tokamak remote operation: Application to JT-60SA

    Energy Technology Data Exchange (ETDEWEB)

    Innocente, Paolo, E-mail: paolo.innocente@igi.cnr.it [Consorzio RFX, Corso Stati Uniti 4, 35127 Padova (Italy); Barbato, Paolo [Consorzio RFX, Corso Stati Uniti 4, 35127 Padova (Italy); Farthing, Jonathan [CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Giruzzi, Gerardo [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Ide, Shunsuke [Japan Atomic Energy Agency, Naka, Ibaraki-ken 311-0193 (Japan); Imbeaux, Frédéric; Joffrin, Emmanuel [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Kamada, Yutaka [Japan Atomic Energy Agency, Naka, Ibaraki-ken 311-0193 (Japan); Kühner, Georg [Max-Planck-Institute for Plasma Physics, EURATOM Association, Wendelsteinstr. 1, 17491 Greifswald (Germany); Naito, Osamu; Urano, Hajime; Yoshida, Maiko [Japan Atomic Energy Agency, Naka, Ibaraki-ken 311-0193 (Japan)

    2015-10-15

    Highlights: • We analyzed the data management system (DMS) appropriate for international collaboration. • We define the principal requirements for all components of the DMS. • We evaluated application of DMS requirements to the JT-60SA experiment. • We evaluated the role network bandwidth and time delay between EU and Japan. - Abstract: Remote operation and data analysis are becoming key requirements of any fusion devices. In this framework a well-conceived data management system integrated with a suite of analysis and support tools are essential components for an efficient remote exploitation of any fusion device. The following components must be considered: data archiving data model architecture; remote data and computers access; pulse schedule, data analysis software and support tools; remote control room specifications and security issues. The definition of a device-generic data model plays also important role in improving the ability to share solution and reducing learning time. As for the remote control room, the implementation of an Operation Request Gateway has been identified as an answer to security issues meanwhile remotely proving all the required features to effectively operate a device. Previous requirements have been analyzed for the new JT-60SA tokamak device. Remote exploitation is paramount in the JT-60SA case which is expected to be jointly operated between Japan and Europe. Due to the geographical distance of the two parties an optimal remote operation and remote data-analysis is considered as a key requirement in the development of JT-60SA. It this case the effects of network speed and delay have been also evaluated and tests have confirmed that the performance can vary significantly depending on the technology used.

  8. 14 CFR 171.273 - Maintenance and operations requirements.

    Science.gov (United States)

    2010-01-01

    ... authorized persons. (3) FCC licensing requirements for operations and maintenance personnel. (4) Posting of..., with a maximum corrective maintenance time of not greater than 1.5 hours. This measure applies to... than 1,500 hours. This measure applies to unscheduled outages, out-of-tolerance conditions, and...

  9. Modified Brokk Demolition Machine with Remote Operator Console. Innovative Technology Summary Report

    International Nuclear Information System (INIS)

    2001-01-01

    The Low-Cost D and D System modifies a commercially available BROKK demolition system for remote viewing and long tether remote operation that provides a portable facility camera pod and interfaces with the Compact Remote Operator Console (TMS Tech ID 2180) to extend the applicability of the BROKK system to projects that require removal of the operator from the work area due to exposure to radiological, chemical, or industrial hazards. The modified BROKK has been integrated with the Compact Remote Operator Console to provide a true remotely operated low-cost D and D system applicable to a wide range of small D and D demolition tasks across the DOE complex

  10. Sustainable construction in remote cold regions.

    Science.gov (United States)

    2015-12-01

    The goal of this project was to identify sustainable construction techniques appropriate for remote and cold regions, some of which apply to : operations and maintenance as well. The vast body of literature regarding green construction in warm region...

  11. Field experience with remote monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Desrosiers, A.E. [Bartlett Services, Inc., Plymouth, MA (United States)

    1995-03-01

    The Remote Monitoring System (RMS) is a combination of Merlin Gerin detection hardware, digital data communications hardware, and computer software from Bartlett Services, Inc. (BSI) that can improve the conduct of reactor plant operations in several areas. Using the RMS can reduce radiation exposures to radiation protection technicians (RPTs), reduce radiation exposures to plant maintenance and operations personnel, and reduce the time required to complete maintenance and inspections during outages. The number of temporary RPTs required during refueling outages can also be reduced. Data from use of the RMS at a two power plants are presented to illustrate these points.

  12. Integrated digital control and man-machine interface for complex remote handing systems

    International Nuclear Information System (INIS)

    Rowe, J.C.; Spille, R.F.; Zimmermann, S.D.

    1987-01-01

    The Advanced Integrated Maintenance System (AIMS) is part of a continuing effort within the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory to develop and extend the capabilities of remote manipulation and maintenance technology. The AIMS is a totally integrated approach to remote handling in hazardous environments. State-of-the-art computer systems connected through a high-speed distributed control system that supports the flexibility and expandability needed for large integrated maintenance applications. A man-Machine Interface provides high-level human interaction through a powerful color graphics menu-controlled operator console. An auxiliary control system handles the real-time processing needs for a variety of support hardware. A pair of dedicated fiber-optic-linked master/slave computer systems control the Advanced Servomanipulator master/slave arms using powerful distributed digital processing methods. The FORTH language was used as a real-time operating and development environment for the entire system, and all of these components are integrated into a control room concept that represents the latest advancements in the development of remote maintenance facilities for hazardous environments

  13. Integrated digital control and man-machine interface for complex remote handling systems

    International Nuclear Information System (INIS)

    Rowe, J.C.; Spille, R.F.; Zimmermann, S.D.

    1986-12-01

    The Advanced Integrated Maintenance System (AIMS) is part of a continuing effort within the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory to develop and extend the capabilities of remote manipulation and maintenance technology. The AIMS is a totally integrated approach to remote handling in hazardous environments. State-of-the-art computer systems connected through a high-speed communication network provide a real-time distributed control system that supports the flexibility and expandability needed for large integrated maintenance applications. A Man-Machine Interface provides high-level human interaction through a powerful color graphics menu-controlled operator console. An auxiliary control system handles the real-time processing needs for a variety of support hardware. A pair of dedicated fiber-optic-linked master/slave computer system control the Advanced Servomanipulator master/slave arms using powerful distributed digital processing methods. The FORTH language was used as a real-time operating and development environment for the entire system, and all of these components are integrated into a control room concept that represents the latest advancements in the development of remote maintenance facilities for hazardous environments

  14. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition...... statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning...... and are often the driving mechanisms for failures / faults that need maintenance. Observations of the degree of damage can increase the reliability of predictions and decrease the costs of OM if integrated in a risk-based framework theoretically based on pre-posterior Bayesian decision theory. The mathematical...

  15. Assistance tools for generic definition of ITER maintenance tasks and scenarios in advanced supervisory control systems

    International Nuclear Information System (INIS)

    Zieba, Stéphane; Russotto, François-Xavier; Da Silva Simoes, Max; Measson, Yvan

    2013-01-01

    Highlights: ► Improve supervisory control systems for ITER in-vessel and hot cell maintenance. ► Optimize remote handling operations effectiveness, reliability and safety. ► Provide a generic description of the maintenance tasks and scenarios. ► Development of context-based assistances for operators and supervisor. ► Improvement of operator's situation awareness. -- Abstract: This paper concerns the improvement of supervisory control systems in the context of remote handling for the maintenance tasks in ITER. This work aims at providing a single formalism and tools to define in a generic way the ITER maintenance tasks and scenarios for in-vessel and hot cell operations. A three-layered approach is proposed to model these tasks and scenarios. Physical actions are defined for the scene elements. From these physical actions, behaviours are defined to represent high-level functionalities. Finally, interaction modes define the way that behaviours are achieved in terms of human–machine interactions. Case study concerning the blanket maintenance procedure is discussed concerning the contributions of the descriptive model and the context-based assistances to the activities of supervisory control

  16. Risk mitigation strategies for operations and maintenance activities.

    Science.gov (United States)

    2012-04-01

    The objective of this research was to investigate the application of integrated risk modeling to operations and maintenance activities, specifically moving operations, such as pavement testing, pavement marking, painting, snow removal, shoulder work,...

  17. Remote maintenance of future fusion reactors - a challenge for rad-hard components and smart control strategies

    International Nuclear Information System (INIS)

    Decreton, M.; Geeter, J. De

    1996-01-01

    The future fusion reactor will need frequent maintenance turns, involving inspection, repair and parts replacement inside the vacuum vessel. These operations will require high payload manipulations in constrained space under very high gamma-radiation dose-rates and temperature. Present research is being undertaken to qualify the components of the handling machine under representative conditions, in the framework of the ITER international consortium. Simultaneously, challenging control strategies will be needed to achieve reliable tasking under very poor viewing conditions and elementary sensing help. The paper reviews the present state of the art on both issues and present results of the ongoing research themes among the partners of the ITER programme. In particular, SCK''centre-dot''CEN coordinates the ITER T252 task on Radiation Tolerance Assessment of Remote Handling Components. (UK)

  18. Analysis of operational possibilities and conditions of remote handling systems in nuclear facilities

    International Nuclear Information System (INIS)

    Hourfar, D.

    1989-01-01

    Accepting the development of the occupational radiation exposure in nuclear facilities, it will be showing possibilities of cost effective reduction of the dose rate through the application of robots and manipulators for the maintenance of nuclear power plants, fuel reprocessing plants, decommissioning and dismantling of the mentioned plants. Based on the experiences about industrial robot applications by manufacturing and manipulator applications by the handling of radioactive materials as well as analysis of the handling procedures and estimation of the dose intensity, it will be defining task-orientated requirements for the conceptual design of the remote handling systems. Furthermore the manifold applications of stationary and mobil arranged handling systems in temporary or permanent operation are described. (orig.) [de

  19. Remote handling needs of the Princeton Plasma Physics Laboratory

    International Nuclear Information System (INIS)

    Smiltnieks, V.

    1982-07-01

    This report is the result of a Task Force study commissioned by the Canadian Fusion Fuels Technology Project (CFFTP) to investigate the remote handling requirements at the Princeton Plasma Physics Laboratory (PPPL) and identify specific areas where CFFTP could offer a contractual or collaborative participation, drawing on the Canadian industrial expertise in remote handling technology. The Task Force reviewed four areas related to remote handling requirements; the TFTR facility as a whole, the service equipment required for remote maintenance, the more complex in-vessel components, and the tritium systems. Remote maintenance requirements both inside the vacuum vessel and around the periphery of the machine were identified as the principal areas where Canadian resources could effectively provide an input, initially in requirement definition, concept evaluation and feasibility design, and subsequently in detailed design and manufacture. Support requirements were identified in such areas as the mock-up facility and a variety of planning studies relating to reliability, availability, and staff training. Specific tasks are described which provide an important data base to the facility's remote handling requirements. Canadian involvement in the areas is suggested where expertise exists and support for the remote handling work is warranted. Reliability, maintenance operations, inspection strategy and decommissioning are suggested for study. Several specific components are singled out as needing development

  20. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1203 Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall arrange for full funding for operation and maintenance of contract schools by fiscal year 1981. ...

  1. Remote Operation of the Fermilab/NICADD Photoinjector

    International Nuclear Information System (INIS)

    Barov, Nikolai

    2002-01-01

    The recognition that a new major HEP facility must receive international support and that its execution would benefit from worldwide interaction from design through operation has given rise to the term Global Accelerator Network (GAN). A welcome consequence has been a more permissive attitude toward remote operation of existing facilities.For roughly thirty years, the computer has been the principal operator interface to the beam,and, through the development of the Internet, the operator can be literally anywhere. In this note, the authors describe their approach to enabling a sufficient degree of operation of the photoinjector from afar in order to carry out investigations in beam physics. The goal was to do so on a time scale of a few months and at minimal cost. At this writing, remote shifts are routinely scheduled involving DESY and LBL, limited in frequency only by the requests of the collaborators and by the need for time to interpret the data

  2. Value centric approaches to the design, operations and maintenance of wind turbines

    Science.gov (United States)

    Khadabadi, Madhur Aravind

    Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal

  3. Advanced Tele-operation

    International Nuclear Information System (INIS)

    Decreton, M.

    1998-01-01

    Maintenance, repair, and dismantling operations in nuclear facilities have to be performed remotely when high radiation doses exclude hands-on operation, but also to minimize contamination risks and occupational doses to the operators. Computer-aided and sensor-based tele-operation enhances safety, reliability, and performance by helping the operator in difficult tasks with poor remote environmental perception. The objectives of work in this domain are to increase the scientific knowledge of the studied phenomena, to improve the interpretation of data, to improve the piloting og experimental devices during irradiation, to reveal and to understand possible unexpected phenomena occurring during irradiation. This scientific report describes the achievements for 1997 in the area of radiation tolerance for of remote-sensing, optical fibres and optical fibre sensors

  4. Advancement of remote technology: past perspectives and future plans

    International Nuclear Information System (INIS)

    Feldman, M.J.; Hamel, W.R.

    1984-01-01

    In the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past five years. The new remote technology under development is expected to significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. The motivation and justification for the program are discussed by surveying the 40 years of remote operating experience which exists and considering the essential features of various old and new philosophies which have been, or are being, used in remote engineering. A future direction based upon the Remotex concept is explained, and recent progress in the development of an advanced servomanipulator-based maintenance concept is summarized to show that a new generation of remote systems capability is feasible through advanced technology. 20 references, 10 figures, 1 table

  5. Advancement of remote technology: past perspectives and future plans

    International Nuclear Information System (INIS)

    Feldman, M.J.; Hamel, W.R.

    1984-01-01

    In the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past five years. The new remote technology under development is expected to significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. The motivation and justification for the program are discussed by surveying the 40 years of remote operating experience which exists and considering the essential features of various old and new philosophies which have been, or are being, used in remote engineering. A future direction based upon the Remotex concept is explained, and recent progress in the development of an advanced servomanipulator-based maintenance concept is summarized to show that a new generation of remote systems capability is feasible through advanced technology. 20 references, 9 figures, 1 table

  6. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  7. Remote handling in ZEPHYR

    International Nuclear Information System (INIS)

    Andelfinger, C.; Lackner, E.; Ulrich, M.; Weber, G.; Schilling, H.B.

    1982-04-01

    A conceptual design of the ZEPHYR building is described. The listed radiation data show that remote handling devices will be necessary in most areas of the building. For difficult repair and maintenance works it is intended to transfer complete units from the experimental hall to a hot cell which provides better working conditions. The necessary crane systems and other transport means are summarized as well as suitable commercially available manipulators and observation devices. The conept of automatic devices for cutting and welding and other operations inside the vacuum vessel and the belonging position control system is sketched. Guidelines for the design of passive components are set up in order to facilitate remote operation. (orig.)

  8. Operation and maintenance in the cooling and ventilation group

    OpenAIRE

    Bangert, N

    2003-01-01

    A core team of CERN staff is running the daily operations of the cooling and ventilation equipment at CERN, thus assuring multiple interfaces such as constant contact with the users of existing installations, the project leaders for new installations and intern-divisional communication. As support of this team, re-tendered contracts with external companies for the maintenance and operational tasks have been put into place multiple years ago. Higherlevel maintenance continues to be entrusted t...

  9. Gas characterization system operation, maintenance, and calibration plan

    International Nuclear Information System (INIS)

    Tate, D.D.

    1996-01-01

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations

  10. EHV network operation, maintenance, organization and training

    Energy Technology Data Exchange (ETDEWEB)

    Gravier, J P [Electricite de France (EDF), 75 - Paris (France)

    1994-12-31

    The service interruptions of electricity have an ever increasing social and industrial impact, it is thus fundamental to operate the network to its best level of performances. To face these changing conditions, Electricite de France has consequently adapted its strategy to improve its organization for maintenance and operation, clarify the operation procedures and give further training to the staff. This work presents the above mentioned issues. (author) 2 figs.

  11. NASA work unit system file maintenance manual

    Science.gov (United States)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

  12. Robotics and remote handling in the nuclear industry

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    This book presents the papers given at a conference on the use of remote handling equipment in nuclear facilities. Topics considered at the conference included dose reduction, artificial intelligence in nuclear plant maintenance, robotic welding, uncertainty covariances, reactor operation and inspection, reactor maintenance and repair, uranium mining, fuel fabrication, reactor component manufacture, irradiated fuel and radioactive waste management, and radioisotope handling.

  13. Pyroprocess Deployment Analysis and Remote Accessibility Experiment using Digital Mockup and Simulation

    International Nuclear Information System (INIS)

    Kim, K. H.; Park, H. S.; Kim, S. H.; Choi, C. H.; Lee, H. J.; Park, B. S.; Yoon, G. S.; Kim, K. H.; Kim, H. D.

    2009-11-01

    Nuclear fuel cycle facility that treats with spent fuel must be designed and manufactured a Pyroprcess facility and process with considering a speciality as every process have to be processed remotely. To prevent an unexpected accident under a circumstance that must operate with a remote manipulator after done the Pyroprocess facility, an procedure related Pyroprocess operation and maintenance need to establish it in the early design stage. To develop the simulator that is mixed by 3D modelling and simulation, a system architecture was designed. A full-scale digital mockup with a real pyroprocess facility was designed and manufactured. An inverse kinematics algorithm of remote manipulator was created in order to simulate an accident and repair that could happen in pyroprocess operation and maintenance under a virtual digital mockup environment. Deployment analysis of process devices through a workspace analysis was carried out and Accessibility analysis by using haptic device was examined

  14. A remotely operated excavator [HAZ-TRAK

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    HAZ-TRAK is a remotely operated excavator and material handling system for nuclear waste site characterization, waste site remediation, and the decommissioning of nuclear facilities. HAZ-TRAK combines the power and mobility of a commercial excavator, with the dexterity and controllability of a force feedback manipulator system: when operating HAZ-TRAK as an excavator, the operator can feel buried objects. A master/slave control method enables the operator to intuitively control all the excavator arm functions with one hand. The main features of the excavator are described in this article. (author)

  15. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  16. Development of remote disassembly technology for liquid-metal reactor (LMR) fuel

    International Nuclear Information System (INIS)

    Bradley, E.C.; Evans, J.H.; Metz, C.F. III; Weil, B.S.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program (CFRP) is to develop equipment and demonstrate technology to reprocess fast breeder reactor fuel. Experimental work on fuel disassembly cutting methods began in the 1970s. High-power laser cutting was selected as the preferred cutting method for fuel disassembly. Remotely operated development equipment was designed, fabricated, installed, and tested at Oak Ridge National Laboratory (ORNL). Development testing included remote automatic operation, remote maintenance testing, and laser cutting process development. This paper summarizes the development work performed at ORNL on remote fuel disassembly. 2 refs., 1 fig

  17. How the Station will operate. [operation, management, and maintenance in space

    Science.gov (United States)

    Cox, John T.

    1988-01-01

    Aspects of the upcoming operational phase of the Space Station (SS) are examined. What the crew members will do with their time in their specialized roles is addressed. SS maintenance and servicing and the interaction of the SS Control Center with Johnson Space Center is discussed. The planning of payload operations and strategic planning for the SS are examined.

  18. Remote-automated inspection and maintenance of nuclear power plant equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Masayoshi; Nakano, Yoshiyuki

    1984-12-01

    Employing remote-control inspection and maintenance equipment in nuclear power plants increases the plant availability by decreasing the annual shutdown time (outage), as well as radiation exposure and man-power. This paper presents an outline of the latest designs for an automatic refueling machine, a control rod drive handling machine, a fuel preparation machine, and a main steam line plug, which were supplied to the Fukushima Dai-Ni No. 2 Plant of the Tokyo Electric Power Co., Inc. (Fukushima 2-2). Also, the up-to-date developments of other new automatic machines, such as a CRD disassembly and cleaning system, spent fuel channel box volume reduction equipment, and robotics for nuclear plant use are presented.

  19. Applying HAZOP analysis in assessing remote handling compatibility of ITER port plugs

    International Nuclear Information System (INIS)

    Duisings, L.P.M.; Til, S. van; Magielsen, A.J.; Ronden, D.M.S.; Elzendoorn, B.S.Q.; Heemskerk, C.J.M.

    2013-01-01

    Highlights: ► We applied HAZOP analysis to assess the criticality of remote handling maintenance activities on port plugs in the ITER Hot Cell facility. ► We identified several weak points in the general upper port plug maintenance concept. ► We made clear recommendations on redesign in port plug design, operational sequence and Hot Cell equipment. ► The use of a HAZOP approach for the ECH UL port can also be applied to ITER port plugs in general. -- Abstract: This paper describes the application of a Hazard and Operability Analysis (HAZOP) methodology in assessing the criticality of remote handling maintenance activities on port plugs in the ITER Hot Cell facility. As part of the ECHUL consortium, the remote handling team at the DIFFER Institute is developing maintenance tools and procedures for critical components of the ECH Upper launcher (UL). Based on NRG's experience with nuclear risk analysis and Hot Cell procedures, early versions of these tool concepts and maintenance procedures were subjected to a HAZOP analysis. The analysis identified several weak points in the general upper port plug maintenance concept and led to clear recommendations on redesigns in port plug design, the operational sequence and ITER Hot Cell equipment. The paper describes the HAZOP methodology and illustrates its application with specific procedures: the Steering Mirror Assembly (SMA) replacement and the exchange of the Mid Shield Optics (MSO) in the ECH UPL. A selection of recommended changes to the launcher design associated with the accessibility, maintainability and manageability of replaceable components are presented

  20. Computerization of operation and maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs

  1. Computerization of operation and maintenance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs.

  2. Development of advanced human-machine system for plant operation and maintenance

    International Nuclear Information System (INIS)

    Wu, Wei; Ohi, Tadashi; Yoshikawa, Hidekazu; Sawaragi, Tetsuo; Kitamura, Masaharu; Furuta, Kazuo; Gofuku, Akio; Ito, Koji

    2004-01-01

    With the worldwide deregulation of the power industry, and the aging of the nuclear power plants (NPPs), concerns are growing over the reliability and safety of the NPPs, because the regulation of man power may lower the current high level of reliability and safety. In this paper, a concept of overall integrated plant management mechanism is proposed, in order to meet the requirements of cutting costs of NPPs and the requirements of maintaining or increasing safety and reliability. The concept is called as satellite operation maintenance center (SOMC). SOMC integrates the operation and maintenance activities of several NPP units by utilizing advanced information technologies to support cooperation activities between workers allocated at SOMC and the field workers. As for the operation activities, a framework called as Advanced Operation System (AOS) is proposed in this paper. AOS consists of three support sub-systems: dynamic operation permission system(DyOPS), supervisor information presentation system using interface agent, and crew performance evaluation system. As for the maintenance activities, a framework called as Ubiquitous-Computing-based Maintenance support System (UCMS) is proposed next. Two case studies are described, in order to show the way of how UCMS support field workers to do maintenance tasks efficiently, safely, and infallibly as well. Finally, a prospect of SOMC is shown in order to explain the way of how the technology elements developed in this project could be integrated as a whole one system to support maintenance activities of NPPs in the future. (author)

  3. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  4. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  5. Advancement of remote systems technology: past perspectives and future plans

    International Nuclear Information System (INIS)

    Hamel, W.R.; Feldman, M.J.

    1984-04-01

    In the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past five years. The new remote technology under development is expected to significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. The motivation and justification for the program are discussed by surveying the 40 years of remote operating experience which exists and considering the essential features of various old and new philosophies which have been, or are being, used in remote engineering. A future direction based upon the Remotex concept is explained, and recent progress in the development of an advanced servomanipulator-based maintenance concept is summarized to show that a new generation of remote systems capability is feasible through advanced technology. 20 references, 10 figures, 1 table

  6. Advancement of remote systems technology: past perspectives and future plans

    International Nuclear Information System (INIS)

    Feldman, M.J.; Hamel, W.R.

    1984-01-01

    In the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past five years. The new remote technology under development is expected to significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. The motivation and justification for the program are discussed by surveying the 40 years of remote operating experience which exists and considering the essential features of various old and new philosophies which have been, or are being, used in remote engineering. A future direction based upon the Remotex concept is explained, and recent progress in the development of an advanced servomanipulator-based maintenance concept is summarized to show that a new generation of remote systems capability is feasible through advanced technology. 9 references, 5 figures

  7. Advancement of remote systems technology: past perspectives and future plans

    International Nuclear Information System (INIS)

    Feldman, M.J.; Hamel, W.R.

    1984-01-01

    In the Fuel Recycle Division, Consolidated Fuel Reprocessing Program, at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past five years. The new remote technology under development is expected to significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. The motivation and justification for the program are discussed by surveying the 40 years of remote operating experience which exists and considering the essential features of various old and new philosophies which have been, or are being, used in remote engineering. A future direction based upon the Teletec concept is explained, and recent progress in the development of an advanced servomanipulator-based maintenance concept is summarized to show that a new generation of remote systems capability is feasible through advanced technology. 20 references, 9 figures, 1 table

  8. Intelligent Operation and Maintenance of Micro-grid Technology and System Development

    Science.gov (United States)

    Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian

    2018-01-01

    In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.

  9. The advancement of remote systems technology: Past perspectives and future plans

    International Nuclear Information System (INIS)

    Feldman, M.J.; Hamel, W.R.

    1984-01-01

    In the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past five years. The new remote technology under development is expected to significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. The motivation and justification for the program are discussed by surveying the 40 years of remote operating experience which exists and considering the essential features of various old and new philosophies which have been, or are being, used in remote engineering. A future direction based upon the Remotex concept is explained, and recent progress in the development of an advanced servomanipulator-based maintenance concept is summarized to show that a new generation of remote systems capability is feasible through advanced technology

  10. The advancement of remote systems technology: Past perspectives and future plans

    International Nuclear Information System (INIS)

    Feldman, M.J.; Hamel, W.R.

    1984-01-01

    In the Fuel Recycle Division, Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past five years. The new remote technology under development is expected to significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. The motivation and justification for the program are discussed by surveying the 40 years of remote operating experience which exists and considering the essential features of various old and new philosophies which have been, or are being, used in remote engineering. A future direction based upon the Teletec concept is explained, and recent progress in the development of an advanced servomanipulator-based maintenance concept is summarized to show that a new generation of remote systems capability is feasible through advanced technology

  11. 49 CFR 193.2713 - Training: operations and maintenance.

    Science.gov (United States)

    2010-10-01

    ... first-aid; and (3) All operating and appropriate supervisory personnel— (i) To understand detailed... 49 Transportation 3 2010-10-01 2010-10-01 false Training: operations and maintenance. 193.2713... LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Personnel Qualifications and Training § 193.2713...

  12. Fast Flux Test Facility interim examination and maintenance cell - past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The first 10 yr of operation were mainly devoted to the disassembly and examination of core component test assemblies. While some maintenance was performed on reactor support equipment, such as the closed-loop ex-vessel machine (CLEM) sodium-wetted grapple, 90% of IEM cell availability has been devoted to core component tests. Some test assemblies originally considered for processing in the IEM cell have not been irradiated; others, not originally planned, have been designed, irradiated, and processed. While no major reactor equipment has required remote repair or maintenance, the IEM cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished and are described

  13. The application of advanced remote systems technology to future waste handling facilities: Waste Systems Data and Development Program

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future US nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two FWMS major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment. 5 refs., 7 figs

  14. Applying HAZOP analysis in assessing remote handling compatibility of ITER port plugs

    NARCIS (Netherlands)

    Duisings, L. P. M.; van Til, S.; Magielsen, A. J.; Ronden, D. M. S.; Elzendoorn, B. S. Q.; Heemskerk, C. J. M.

    2013-01-01

    This paper describes the application of a Hazard and Operability Analysis (HAZOP) methodology in assessing the criticality of remote handling maintenance activities on port plugs in the ITER Hot Cell facility. As part of the ECHUL consortium, the remote handling team at the DIFFER Institute is

  15. Operation and maintenance results from ISFOC CPV plants

    Science.gov (United States)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  16. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  17. Designing remote monitoring systems for long term maintenance and reliability

    International Nuclear Information System (INIS)

    Davis, G.E.; Johnson, G.L.; Schrader, F.D.; Stone, M.A.; Wilson, E.F.

    2001-01-01

    Full text: As part of the effort to modernize safeguards equipment, the IAEA is continuing to acquire and install equipment for upgrading obsolete surveillance systems with digital technology; and providing remote-monitoring capabilities where and when economically justified. Remote monitoring is expected to reduce inspection effort, particularly at storage facilities and reactor sites. Remote monitoring technology will not only involve surveillance, but will also include seals, sensors, and other unattended measurement equipment. LLNL's experience with the Argus Security System offers lessons for the design, deployment, and maintenance of remote monitoring systems. Argus is an integrated security system for protection of high-consequence U.S. Government assets, including nuclear materials. Argus provides secure transmission of sensor data, administrative data, and video information to support intrusion detection and access control functions. LLNL developed and deployed the Argus system on its own site in 1988. Since that time LLNL has installed, maintained, and upgraded Argus systems at several Department of Energy and Department of Defense sites in the US as well as at the original LLNL site. Argus has provided high levels of reliability and integrity, as well as reducing overall lifecycle cost through incremental improvements to hardware and software. This philosophy permits expansion of functional capability, hardware upgrade and software upgrade without system outages and with minimum outage of local functions. This presentation will describe Argus design strategies and lessons learned from the Argus program as they apply to the design, development, and maintenance of a remote monitoring network. Hardware failures, software failures, and communication outages are expected and must be addressed by astute selection of system architecture. A combination of redundancy, diversity, and effective functional allocation between field and system level components should

  18. Experience in operation and maintenance of PWRs

    International Nuclear Information System (INIS)

    Broecker, H.; Schomer, E.

    1987-01-01

    At present there are 10 PWRs in operation, most of them built on turnkey basis by KWU. The availability of West German PWRs amounted to 84.7% on average for the period from 1982-86. The good operating results are attributable to the following: 1. Sophiticated design and layout of the plant with good accessibility to the primary system even during operation. 2. Reliable performance of plant and components as result of extensive quality assurance. 3. Well-organized and highly qualified operating personnel. 4. Inservice inspection and preventive maintenance. 5. Good information feedback system. (Liu)

  19. Remote Education Using Web Conference System in a Company of Coin Parking Business

    Science.gov (United States)

    Yoshioka, Yoshio; Mito, Hiroyuki; Azuma, Kouji

    Maintenance jobs at coin parking places (CP) are very important for keeping trouble free operation. Such maintenance jobs include special inspection at the initiation of new CP and ordinal maintenance works. In order to level up the skill of maintenance people in the company, education of the basic knowlege of electricity, facility and maintenance skills are required. We made an original text for maintenance people, and practiced education by use of web conference system, because they are distributed in whole country, This paper describes a content of text on fundamental knowledge of electricity, facility of coin parking system and trouble experiences, and also a practice of remote education using web conference system. Problems of remote education which were found by practice and the future education plan of practical skill are also described.

  20. How wireless remote technology reduces cost, boosts productivity and improves safety in upstream oil and gas operations

    Energy Technology Data Exchange (ETDEWEB)

    Wommack, K. [Viatran, Edmonton, AB (Canada)

    2009-09-15

    This article demonstrated how wireless communications can help oil and gas producers obtain the most current information on the status of their operations to help optimize operations and protect workers and equipment. Wireless communication can provide benefits at nearly every phase of upstream production. When combined with pressure, temperature, flow, level and other sensing devices, wireless communications provide an effective and economical way to deliver data on well or pipeline operations to site managers; optimize well-production, minimize workovers and prevent blowdowns at the wellhead; track oil and water production; measure differential pressure, line pressure and line temperature; and monitor the motorized choke and control valve position. Wireless technology offers significant savings through improved maintenance efficiency. With wireless systems in remote locations, there are seldom problems in the transmission path. Wireless technology makes it much easier and affordable to manage well operations from a safe distance. By eliminating the need for wires in a fracing operation, wireless can help fracing companies maintain a safe operating distance from their target wells, and move operations from well to well with ease. A wireless communication system for transmitting process data from field sensors to a field processing device consists of radio transmitters, a communications gateway and a user interface. The communications hub receives encrypted messages from the remote devices and transmits them to a flow computer, SCADA system, or Distributed Control System. Data is then transmitted to a central office. 1 fig.

  1. Remote maintenance in TOR fast reactor fuel reprocessing facility

    International Nuclear Information System (INIS)

    Eymery, R.; Constant, M.; Malterre, G.

    1986-11-01

    The TOR facility which is undergoing commissioning tests has a capacity of 5 T. HM/year which is enough for reprocessing all the Phenix fuel, with an excess capacity which is to be used for other fast reactors fuels. It is the result of enlargement and renovation of the old Marcoule pilot facility. A good load factor is expected through the use of equipment with increased reliability and easy maintenance. TOR will also be used to test new equipment developed for the large breeder fuel reprocessing plant presently in the design stage. The latter objective is specifically important for the parts of the plant involving mechanical equipment which are located in a new building: TOR 1. High reliability and flexibility will be obtained in this building thanks to the attention given to the integrated remote handling system [fr

  2. Virtual reality technology in nuclear power plant operation and maintenance

    International Nuclear Information System (INIS)

    Chen Sen

    2005-01-01

    In this paper a generic virtual reality comprehensive system focusing on the operation and maintenance in Nuclear Power Plant (NPP) is proposed. Under this layout, some key topics and means of the system are discussed. As example 'Virtual Nuclear Island' comprehensive system and its typical applications in NPP are set up. In the end, it prospects the applications of virtual reality technology in NPP operation, training and maintenance. (author)

  3. Remote handling technology for nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Sakai, Akira; Maekawa, Hiromichi; Ohmura, Yutaka

    1997-01-01

    Design and R and D on nuclear fuel cycle facilities has intended development of remote handling and maintenance technology since 1977. IHI has completed the design and construction of several facilities with remote handling systems for Power Reactor and Nuclear Fuel Development Corporation (PNC), Japan Atomic Energy Research Institute (JAERI), and Japan Nuclear Fuel Ltd. (JNFL). Based on the above experiences, IHI is now undertaking integration of specific technology and remote handling technology for application to new fields such as fusion reactor facilities, decommissioning of nuclear reactors, accelerator testing facilities, and robot simulator-aided remote operation systems in the future. (author)

  4. Remote maintenance of in-vessel components in Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Loesser, G.D.; Heitzenroeder, P.; Kungl, D.; Dylla, H.F.; Cerdan, G.

    1990-01-01

    The Tokamak Fusion Test Reactor (TFTR) will generate a total of 3 x 10 21 neutrons during its planned D-T operational period. A maintenance manipulator has been designed and tested to minimize personnel radiation during in-vessel maintenance activities. Its functions include visual inspection, first-wall tile replacement, cleaning, diagnostics calibrations and leak detection. To meet these objectives, the TFTR maintenance manipulator is required to be operable in the TFTR high vacuum environment, typically -8 torr, ( -6 Pa). Geometrically, the manipulator must extend 180 0 in either direction around the torus to assure complete coverage of the vessel first-wall. The manipulator consists of a movable carriage, and movable articulated link sections which are driven by electrical actuators. The boom has vertical load capacity of 455 kg and lateral load capacity of 46 kg. The boom can either be fitted with a general inspection arm or dextrous slave arms. The general inspection arm is designed to hold the leak detector and an inspection camera; it is capable of rotation along two axes and has a linkage system which permits motion normal to the vacuum vessel wall. All systems except the dextrous slave arms are operable in a vacuum. (author)

  5. Remote operated vehicle with carbon dioxide blasting (ROVCO2)

    International Nuclear Information System (INIS)

    Resnick, A.M.

    1995-01-01

    The Remote Operated Vehicle with Carbon Dioxide Blasting (ROVCO 2 ), as shown in a front view, is a six-wheeled remote land vehicle used to decontaminate concrete floors. The remote vehicle has a high pressure Cryogenesis blasting subsystem, Oceaneering Technologies (OTECH) developed a CO 2 xY Orthogonal Translational End Effector (COYOTEE) subsystem, and a vacuum/filtration and containment subsystem. Figure 2 shows a block diagram with the various subsystems labeled

  6. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  7. Remote connector development study

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1995-05-01

    Plutonium-uranium extraction (PUREX) connectors, the most common connectors used at the Hanford site, offer a certain level of flexibility in pipe routing, process system configuration, and remote equipment/instrument replacement. However, these desirable features have inherent shortcomings like leakage, high pressure drop through the right angle bends, and a limited range of available pipe diameters that can be connect by them. Costs for construction, maintenance, and operation of PUREX connectors seem to be very high. The PUREX connector designs include a 90 degree bend in each connector. This increases the pressure drop and erosion effects. Thus, each jumper requires at least two 90 degree bends. PUREX connectors have not been practically used beyond 100 (4 in.) inner diameter. This study represents the results of a survey on the use of remote pipe-connection systems in US and foreign plants. This study also describes the interdependence between connectors, remote handling equipment, and the necessary skills of the operators

  8. Reduced bandwidth video for remote vehicle operations

    Energy Technology Data Exchange (ETDEWEB)

    Noell, T.E.; DePiero, F.W.

    1993-08-01

    Oak Ridge National Laboratory staff have developed a video compression system for low-bandwidth remote operations. The objective is to provide real-time video at data rates comparable to available tactical radio links, typically 16 to 64 thousand bits per second (kbps), while maintaining sufficient quality to achieve mission objectives. The system supports both continuous lossy transmission of black and white (gray scale) video for remote driving and progressive lossless transmission of black and white images for remote automatic target acquisition. The average data rate of the resulting bit stream is 64 kbps. This system has been demonstrated to provide video of sufficient quality to allow remote driving of a High-Mobility Multipurpose Wheeled Vehicle at speeds up to 15 mph (24.1 kph) on a moguled dirt track. The nominal driving configuration provides a frame rate of 4 Hz, a compression per frame of 125:1, and a resulting latency of {approximately}1s. This paper reviews the system approach and implementation, and further describes some of our experiences when using the system to support remote driving.

  9. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  10. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    International Nuclear Information System (INIS)

    Milana; Khan, M K; Munive, J E

    2014-01-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective

  11. Integrated approach to optimize operation and maintenance costs for operating nuclear power plants

    International Nuclear Information System (INIS)

    2006-06-01

    In the context of increasingly open electricity markets and the 'unbundling' of generating companies from former utility monopolies, an area of major concern is the economic performance of the existing fleet of nuclear power plants. Nuclear power, inevitably, must compete directly with other electricity generation sources. Coping with this competitive pressure is a challenge that the nuclear industry should meet if the nuclear option is to remain a viable one. This competitive environment has significant implications for nuclear plant operations, including, among others, the need for the more cost effective management of plant activities, and the greater use of analytical tools to balance the costs and benefits of proposed activities, in order to optimize operation and maintenance costs, and thus insure the economic competitiveness of existing nuclear power plants. In the framework of the activities on Nuclear Economic Performance Information System (NEPIS), the IAEA embarked in developing guidance on optimization of operation and maintenance costs for nuclear power plants. The report was prepared building on the fundamental that optimization of operation and maintenance costs of a nuclear power plant is a key component of a broader integrated business strategic planning process, having as overall result achievement of organization's business objectives. It provides advice on optimization of O and M costs in the framework of strategic business planning, with additional details on operational planning and controlling. This TECDOC was elaborated in 2004-2005 in the framework of the IAEA's programme on Nuclear Power Plant Operating Performance and Life Cycle Management, with the support of two consultants meetings and one technical meeting and based on contributions provided by participants. It can serve as a useful reference for the management and operation staff within utilities, nuclear power plant operators and regulators and other organizations involved in

  12. Identifying Human Factors Issues in Aircraft Maintenance Operations

    Science.gov (United States)

    Veinott, Elizabeth S.; Kanki, Barbara G.; Shafto, Michael G. (Technical Monitor)

    1995-01-01

    Maintenance operations incidents submitted to the Aviation Safety Reporting System (ASRS) between 1986-1992 were systematically analyzed in order to identify issues relevant to human factors and crew coordination. This exploratory analysis involved 95 ASRS reports which represented a wide range of maintenance incidents. The reports were coded and analyzed according to the type of error (e.g, wrong part, procedural error, non-procedural error), contributing factors (e.g., individual, within-team, cross-team, procedure, tools), result of the error (e.g., aircraft damage or not) as well as the operational impact (e.g., aircraft flown to destination, air return, delay at gate). The main findings indicate that procedural errors were most common (48.4%) and that individual and team actions contributed to the errors in more than 50% of the cases. As for operational results, most errors were either corrected after landing at the destination (51.6%) or required the flight crew to stop enroute (29.5%). Interactions among these variables are also discussed. This analysis is a first step toward developing a taxonomy of crew coordination problems in maintenance. By understanding what variables are important and how they are interrelated, we may develop intervention strategies that are better tailored to the human factor issues involved.

  13. Remote technology in the spent fuel route in the UK

    International Nuclear Information System (INIS)

    Webster, A.W.

    1999-01-01

    Remote technologies employed in front end (commercial) reprocessing operations of metallic and oxide fuel at Sellafield in the UK are described. An overview of the transportation, fuel receiving and preparation facilities are given together with the remote technology developments employed to improve operations. It is concluded that the facilities and remote technology used within them are mature and based upon simple and robust principles. Remote operations and maintenance in these facilities is often easier than in many facilities downstream of the dissolution stage. Fuel design considerations for shearing and handling are described and it is concluded that advanced and higher burnup fuel can be accommodated by existing reprocessing and interim storage routes with current remote technologies. Two different storage systems are available from UK companies which use existing spent fuel handling technology/equipment. The pace of remote technology development is currently being set by the demands of other nuclear process areas such as decommissioning and plant clean out; these will spin-off into front end processes. (author)

  14. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  15. Remote operation: a selective review of research into visual depth perception.

    Science.gov (United States)

    Reinhardt-Rutland, A H

    1996-07-01

    Some perceptual motor operations are performed remotely; examples include the handling of life-threatening materials and surgical procedures. A camera conveys the site of operation to a TV monitor, so depth perception relies mainly on pictorial information, perhaps with enhancement of the occlusion cue by motion. However, motion information such as motion parallax is not likely to be important. The effectiveness of pictorial information is diminished by monocular and binocular information conveying flatness of the screen and by difficulties in scaling: Only a degree of relative depth can be conveyed. Furthermore, pictorial information can mislead. Depth perception is probably adequate in remote operation, if target objects are well separated, with well-defined edges and familiar shapes. Stereoscopic viewing systems are being developed to introduce binocular information to remote operation. However, stereoscopic viewing is problematic because binocular disparity conflicts with convergence and monocular information. An alternative strategy to improve precision in remote operation may be to rely on individuals who lack binocular function: There is redundancy in depth information, and such individuals seem to compensate for the lack of binocular function.

  16. CP-5 reactor remote dismantlement activities: Lessons learned in the integration of new technology in an operations environment

    International Nuclear Information System (INIS)

    Noakes, M.W.

    1998-01-01

    This paper presents the developer's perspective on lessons learned from one example of the integration of new prototype technology into a traditional operations environment. The dual arm work module was developed by the Robotics Technology Development Program as a research and development activity to examine manipulator controller modes and deployment options. It was later reconfigured for the dismantlement of the Argonne National Laboratory Chicago Pile No. 5 reactor vessel as the crane-deployed dual arm work platform. Development staff worked along side operations staff during a significant part of the deployment to provide training, maintenance, and tooling support. Operations staff completed all actual remote dismantlement tasks. At the end of available development support funding, the Dual Arm Work Platform was turned over to the operations staff, who are still using it to complete their dismantlement tasks

  17. Measuring robustness of port plug maintenance schedules in fusion remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Schoen, P.W., E-mail: p.w.schoen@heemskerk-innovative.nl [Heemskerk Innovative Technology, Sassenheim (Netherlands); Thomas, J. [CCFE EURATOM/CCFE Fusion Association, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Boessenkool, H. [FOM Institute DIFFER, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology, Sassenheim (Netherlands)

    2015-12-15

    Unexpected events during maintenance operations of a fusion plant like JET or ITER may require rescheduling, suspending the execution of the current procedure to pick it up later. In this paper, we look at how the introduction of slack influences the port plug maintenance schedule robustness. We introduce a metrics to measure the robustness. Simulating disruptions we evaluate the effect on a schedule. Finally, we show how the robustness is affected when introducing different amounts of slack.

  18. Measuring robustness of port plug maintenance schedules in fusion remote handling

    International Nuclear Information System (INIS)

    Schoen, P.W.; Thomas, J.; Boessenkool, H.; Heemskerk, C.J.M.

    2015-01-01

    Unexpected events during maintenance operations of a fusion plant like JET or ITER may require rescheduling, suspending the execution of the current procedure to pick it up later. In this paper, we look at how the introduction of slack influences the port plug maintenance schedule robustness. We introduce a metrics to measure the robustness. Simulating disruptions we evaluate the effect on a schedule. Finally, we show how the robustness is affected when introducing different amounts of slack.

  19. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  20. Remote replacement of TF [toroidal field] and PF [poloidal field] coils for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.; Watkin, D.C.; Hollis, M.J.; DePew, R.E.; Kuban, D.P.

    1990-01-01

    The use of deuterium-tritium fuel in the Compact Ignition Tokamak will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion devices auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. In-vessel remote maintenance included replacement of divertor and first wall hardware, faraday shields, and for an in-vessel inspection system. Provision for remote replacement of a vacuum vessel sector, toroidal field coil or poloidal field ring coil was not included in the project baseline. As a result of recent coil failures experienced at a number of facilities, the CIT project decided to reconsider the question of remote recovery from a coil failure and, in January of 1990, initiated a coil replacement study. This study focused on the technical requirements and impact on fusion machine design associated with remote recovery from any coil failure

  1. Development of laser cutting/welding system for remote maintenance of ITER manifold

    Energy Technology Data Exchange (ETDEWEB)

    Yamaoka, Hiroto; Tsuchiya, Kazuyuki; Awano, Toshihiko [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan); Oka, Kiyoshi [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment

    2002-09-01

    A remote pipe cutting/welding system using a YAG laser was designed and fabricated for the maintenance of the main structural parts of ITER (International Thermonuclear Experimental Reactor), and a mock-up test carried out. The functions of this system are to cut 100A x Sch 40 pipes of SUS316L by internal access, to adjust the core gap between the as-cut pipe and new pipe, and to weld the pipes automatically. The core gap of the pipes could be decreased within the proper welding conditions by the mock-up test, and sound beads were obtained. (author)

  2. The impact of digitalization on Property Operations and Maintenance (O&M)

    OpenAIRE

    Garcia, Resty Gonzales

    2017-01-01

    The research topic of this master thesis is; “How can digitalization help increase productivity in property Operations and Maintenance (O&M)?” The research topic focuses on the challenges and opportunities in utilizing Computer Aided Facilities Management (CAFM) system regarding the operative function in Operations and Maintenance (O&M). The purpose of this research work is to analyze relevant literature and empirical data on how digitalization affects the O&M process and how the O&M ...

  3. Development of simulator for remote handling system of ITER blanket

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakanhira, Masataka; Matsumoto, Yasuhiro; Shibanuma, K.

    2007-01-01

    The maintenance activity in the ITER has to be performed remotely because 14 MeV neutron caused by fusion reaction induces activation of structural material and emission of gamma ray. In general, it is one of the most critical issues to avoid collision between the remote maintenance system and in-vessel components. Therefore, the visual information in the vacuum vessel is required strongly to understand arrangement of these devices and components. However, there is a limitation of arrangement of viewing cameras in the vessel because of high intensity of gamma ray. It is expected that enough numbers of cameras and lights are not available because of arrangement restriction. Furthermore, visibility of the interested area such as the contacting part is frequently disturbed by the devices and components, thus it is difficult to recognize relative position between the devices and components only by visual information even if enough cameras and lights are equipped. From these reasons, the simulator to recognize the positions of each devices and components is indispensable for remote handling systems in fusion reactors. The authors have been developed a simulator for the remote maintenance system of the ITER blanket using a general 3D robot simulation software ''ENVISION''. The simulator is connected to the control system of the manipulator which was developed as a part of the blanket maintenance system in the EDA and can reconstruct the positions of the manipulator and the blanket module using the position data of the motors through the LAN. In addition, it can provide virtual visual information, such as the connecting operation behind the blanket module with making the module transparent on the screen. It can be used also for checking the maintenance sequence before the actual operation. The developed simulator will be modified further adding other necessary functions and finally completed as a prototype of the actual simulator for the blanket remote handling system

  4. 78 FR 26383 - Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement...

    Science.gov (United States)

    2013-05-06

    ... Proposed Increase in Operation, Maintenance and Replacement Activities Associated With the Wasatch County... of potential impacts associated with a proposed change in Operation, Maintenance and Replacement..., Maintenance, and Replacement Proposed Action includes: stabilizing canal banks; lining, piping, or enclosing...

  5. Remotely-operated equipment for inspection, measurement and handling

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2008-01-01

    As part of the application of ALARA radiation dose reduction principles at CERN, inspection, measurement and handling interventions in controlled areas are being studied in detail. A number of activities which could be carried out as remote operations have already been identified and equipment is being developed. Example applications include visual inspection to check for ice formation on LHC components or water leaks, measurement of radiation levels before allowing personnel access, measurement of collimator or magnet alignment, visual inspection or measurements before fire service access in the event of fire, gas leak or oxygen deficiency. For these applications, a modular monorail train, TIM, has been developed with inspection and measurement wagons. In addition TIM provides traction, power and data communication for lifting and handling units such as the remote collimator exchange module and vision for other remotely operated units such as the TAN detector exchange mini-cranes. This paper describes the eq...

  6. The role of the restructured Mobile Remote Service Base System (MBS) in support of Space Station maintenance and servicing

    Science.gov (United States)

    Darlington, T.; Krukewich, K.

    1992-08-01

    The critical parameters resulting from the restructuring of Space Station Freedom which necessitated the redesign of the Mobile Remote Service Base System (MBS) are described. These include optimization of robotic attachment locations for access to the Space Station truss-mounted orbital replacement units, transport of logistics carriers to the maintenance sites, minimization of EVA overhead associated with maintenance, self-maintenance of other mobile servicing system (MSS) elements on the MBS, and balancing of station EVA and extravehicular robotics in a complementary fashion to minimize maintenance overhead in general. Consideration is given to the configuration of the resulting MBS, which provides the program with maximum flexibility to utilize the assets of the MSS and optimizes end-to-end maintenance with regard to the use of station resources such as crew time and power. Maintenance and servicing scenarios which are instrumental to the reconfigured MBS as well as the results of improved maintenance capability are presented.

  7. High-quality remote interactive imaging in the operating theatre

    Science.gov (United States)

    Grimstead, Ian J.; Avis, Nick J.; Evans, Peter L.; Bocca, Alan

    2009-02-01

    We present a high-quality display system that enables the remote access within an operating theatre of high-end medical imaging and surgical planning software. Currently, surgeons often use printouts from such software for reference during surgery; our system enables surgeons to access and review patient data in a sterile environment, viewing real-time renderings of MRI & CT data as required. Once calibrated, our system displays shades of grey in Operating Room lighting conditions (removing any gamma correction artefacts). Our system does not require any expensive display hardware, is unobtrusive to the remote workstation and works with any application without requiring additional software licenses. To extend the native 256 levels of grey supported by a standard LCD monitor, we have used the concept of "PseudoGrey" where slightly off-white shades of grey are used to extend the intensity range from 256 to 1,785 shades of grey. Remote access is facilitated by a customized version of UltraVNC, which corrects remote shades of grey for display in the Operating Room. The system is successfully deployed at Morriston Hospital, Swansea, UK, and is in daily use during Maxillofacial surgery. More formal user trials and quantitative assessments are being planned for the future.

  8. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  9. ELECTRIC MOTORS MAINTENANCE PLANNING FROM ITS OPERATING VARIABLES

    Directory of Open Access Journals (Sweden)

    Francisco RODRIGUES

    2017-07-01

    Full Text Available The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, conse-quently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algo-rithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface, including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition data, also including the communication protocols among different logical applications.

  10. Design of an overhead crane for the ITER NB cell remote handling maintenance operations

    Energy Technology Data Exchange (ETDEWEB)

    Taubmann, Gonzalo; Brochet, Laurent [IBERTEF A.I.E., Iberica de Tecnologia de Fusion, C/Magallanes 3, 28015 Madrid (Spain); Liniers, Macarena [Asociacion EURATOM-CIEMAT para la Fusion, Av. Complutense 22, 28040 Madrid (Spain)], E-mail: macarena.liniers@ciemat.es; Medrano, Mercedes; Sarasola, Xabier; Botija, Jose; Alonso, Javier [Asociacion EURATOM-CIEMAT para la Fusion, Av. Complutense 22, 28040 Madrid (Spain); Damiani, Carlo [FUSION FOR ENERGY, Josep Pla 2, Torres Diagonal Litoral Ed B3, 08019 Barcelona (Spain)

    2009-06-15

    In the neutral beam cell of ITER all the maintenance operations on the neutral beam components (BLC's) must be performed by an overhead crane of large payload capability (30-50 tonnes). A crane system is presented consisting of a monorail, a carriage, and a lifting mechanism. The monorail must give access to the BLC's in the beam line vessel, the front components connecting the NB vessel with the Tokamak, and a storage area at the north end of the NB cell. Rail switching points are required at the intersections between radial and toroidal branches. A translational switching mechanism is proposed. The crane carriage consists of two independent sub-carriages, each composed of four wheels. A set of four secondary wheels attached to the main carriage prevents the crane tilting due to the CoG misalignment of some loads. The elevation system proposed consists of an electromechanical crane of four independent drums and 50 tonnes payload. In parallel with the crane design, a logistics and space availability study has been carried out, leading to the detection of clearance or transport problems that could be taken into account in the final crane design.

  11. Design of an overhead crane for the ITER NB cell remote handling maintenance operations

    International Nuclear Information System (INIS)

    Taubmann, Gonzalo; Brochet, Laurent; Liniers, Macarena; Medrano, Mercedes; Sarasola, Xabier; Botija, Jose; Alonso, Javier; Damiani, Carlo

    2009-01-01

    In the neutral beam cell of ITER all the maintenance operations on the neutral beam components (BLC's) must be performed by an overhead crane of large payload capability (30-50 tonnes). A crane system is presented consisting of a monorail, a carriage, and a lifting mechanism. The monorail must give access to the BLC's in the beam line vessel, the front components connecting the NB vessel with the Tokamak, and a storage area at the north end of the NB cell. Rail switching points are required at the intersections between radial and toroidal branches. A translational switching mechanism is proposed. The crane carriage consists of two independent sub-carriages, each composed of four wheels. A set of four secondary wheels attached to the main carriage prevents the crane tilting due to the CoG misalignment of some loads. The elevation system proposed consists of an electromechanical crane of four independent drums and 50 tonnes payload. In parallel with the crane design, a logistics and space availability study has been carried out, leading to the detection of clearance or transport problems that could be taken into account in the final crane design.

  12. Influence of visual feedback on human task performance in ITER remote handling

    NARCIS (Netherlands)

    Schropp, Gwendolijn Y R; Heemskerk, Cock J M; Kappers, Astrid M L; Bergmann Tiest, Wouter M; Elzendoorn, Ben S Q; Bult, David

    In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures.

  13. Maintenance Issues in Long Term Operation of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Contri, P.; Bieth, M.; Rieg, C.

    2006-01-01

    Due to current social and economical framework, in last years many nuclear power plant owners started a program for the Long Term Operation (LTO)/PLEX (Plant Life Extension) of their older nuclear facilities. This process has many nuclear safety implications, other than strategic and political ones. The need for tailoring the available safety assessment tools to such applications has become urgent in recent years and triggered many research actions. The review of regular maintenance and ageing management programs are tools widely used in LTO/PLEX context in many Countries. However, most of these tools are rather general and in many cases they need reshaping in an LTO/PLEX framework before application, with focus to the safety implications of the LTO/PLEX. Many Countries and plants radically modified their maintenance rules towards a condition based approach as a precondition for the implementation of LTO/PLEX programs. In 2004 a network of European Organisations operating Nuclear Power Plants, SENUF, under the coordination of the JRC-IE, carried out an extensive questionnaire on maintenance practice in their facilities aiming at capturing the aspects of the maintenance programs where research is mostly needed. This paper uses some results of the questionnaire, which was not oriented to LTO/PLEX, to draw some conclusions on how the current maintenance programs could support a potential LTO/PLEX, among the other programs running at NPPs. In this sense, it is spin-off of the SENUF WG on maintenance. The paper aims at identifying the technical attributes of the maintenance programs more directly affecting the decision for a long-term safe operation of a nuclear facility, the issues related to their implementation and safety review. The paper includes an analysis of the questionnaire circulated among the SENUF participants and a discussion on the implications of optimised maintenance programs in existing plants. Some examples at WWER plants taken by sources other than

  14. Sensor-driven, fault-tolerant control of a maintenance robot

    International Nuclear Information System (INIS)

    Moy, M.M.; Davidson, W.M.

    1987-01-01

    A robot system has been designed to do routine maintenance tasks on the Sandia Pulsed Reactor (SPR). The use of this Remote Maintenance Robot (RMR) is expected to significantly reduce the occupational radiation exposure of the reactor operators. Reactor safety was a key issue in the design of the robot maintenance system. Using sensors to detect error conditions and intelligent control to recover from the errors, the RMR is capable of responding to error conditions without creating a hazard. This paper describes the design and implementation of a sensor-driven, fault-tolerant control for the RMR. Recovery from errors is not automatic; it does rely on operator assistance. However, a key feature of the error recovery procedure is that the operator is allowed to reenter the programmed operation after the error has been corrected. The recovery procedure guarantees that the moving components of the system will not collide with the reactor during recovery

  15. Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair

    International Nuclear Information System (INIS)

    1983-01-01

    This is the initial issue of the guidebook. Since a guidebook of this type must incorporate information concerning a wide range of subjects, much additional data will eventually be included. The guidebook will document, in summary and easily referenceable form, data, designs, design concepts, design guidelines and background information useful to the FWBS and to the Maintenance System designer. In providing guidelines for the AMR of the FWBS, the guidebook must, of necessity, include guidelines for all aspects of maintenance associated with the FWBS. These include most maintenance operations within the reactor room necessary to gain access, identify faults, and handle equipment related to FWBS maintenance. In addition, the guidelines include those required to define facility requirements for handling and repair of FWBS and related reactor components external to the reactor room. Particular emphasis is given to remote maintenance design and operations

  16. Remote operations and viewing using the monitor system

    International Nuclear Information System (INIS)

    Grisham, D.L.; Lambert, J.E.; Baldwin, T.S.; Ekberg, E.L.; Hernandez, T.R.; Raybun, J.L.

    1984-01-01

    Over the past two years, major rebuilding operations were conducted at the Clinton P. Anderson Meson Physics Facility (LAMPF). These operations involved replacement of complex experimental apparatus in high-radiation areas using servomanipulators and video viewing. All remote tasks were completed on or ahead of allotted schedules. This success is attributed to continuing improvement of manipulators, viewing systems, and operating techniques

  17. TRUPACT-II Operating and Maintenance Instructions

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse Electric Corporation, Waste Isolation Division

    1999-12-31

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1

  18. Design requirements, operation and maintenance of gas-cooled reactors

    International Nuclear Information System (INIS)

    1989-06-01

    At the invitation of the Government of the USA the Technical Committee Meeting on Design Requirements, Operation and Maintenance of Gas-Cooled Reactors, was held in San Diego on September 21-23, 1988, in tandem with the GCRA Conference. Both meetings attracted a large contingent of foreign participants. Approximately 100 delegates from 18 different countries participated in the Technical Committee meeting. The meeting was divided into three sessions: Gas-cooled reactor user requirement (8 papers); Gas-cooled reactor improvements to facilitate operation and maintenance (10 papers) and Safety, environmental impacts and waste disposal (5 papers). A separate abstract was prepared for each of these 23 papers. Refs, figs and tabs

  19. Longview District Operations and Maintenance Headquarters: Environmental assessment

    International Nuclear Information System (INIS)

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives

  20. The development of remote repairing system, decontamination and in-cell remote inspection equipment

    International Nuclear Information System (INIS)

    Ishibashi, Yuzo; Toyoda, Osamu; Haginoya, Isao; Yamamoto, Ryuichi; Tanaka, Yasumasa

    1993-01-01

    PNC has been developing remote repair and inspection technologies for in-cell components in reprocessing Plants. In this report, several remote technologies such as remote dismantling and removal, decontamination, remote pipe maintenance and remote in-cell inspection equipment are described. (author)

  1. 43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.

    Science.gov (United States)

    2010-10-01

    ... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Recovery of operation and maintenance (O&M) costs. 426.23 Section 426.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF...

  2. Optimising agile development practices for the maintenance operation: nine heuristics

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Rose, Jeremy

    2014-01-01

    Agile methods are widely used and successful in many development situations and beginning to attract attention amongst the software maintenance community – both researchers and practitioners. However, it should not be assumed that implementing a well-known agile method for a maintenance department...... is therefore a trivial endeavour - the maintenance operation differs in some important respects from development work. Classical accounts of software maintenance emphasise more traditional software engineering processes, whereas recent research accounts of agile maintenance efforts uncritically focus...... on benefits. In an action research project at Aveva in Denmark we assisted with the optimisation of SCRUM, tailoring the standard process to the immediate needs of the developers. We draw on both theoretical and empirical learning to formulate nine heuristics for maintenance practitioners wishing to go agile....

  3. Operation and maintenance of thermal power stations best practices and health monitoring

    CERN Document Server

    Chanda, Pradip

    2016-01-01

    This book illustrates operation and maintenance practices/guidelines for economic generation and managing health of a thermal power generator beyond its regulatory life. The book provides knowledge for professionals managing power station operations, through its unique approach to chemical analysis of water, steam, oil etc. to identify malfunctioning/defects in equipment/systems much before the physical manifestation of the problem. The book also contains a detailed procedure for conducting performance evaluation tests on different equipment, and for analyzing test results for predicting maintenance requirements, which has lent a new dimension to power systems operation and maintenance practices. A number of real life case studies also enrich the book. This book will prove particularly useful to power systems operations professionals in the developing economies, and also to researchers and students involved in studying power systems operations and control. .

  4. The construction of power grid operation index system considering the risk of maintenance

    Science.gov (United States)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  5. Development of a control system for a heavy object handling manipulator. Application to a remote maintenance system for ITER blanket module

    International Nuclear Information System (INIS)

    Yoshimi, Takashi; Tsuji, Kouichi; Miyagawa, Shinichi; Kubo, Tomomi; Kakudate, Satoshi; Tada, Eisuke

    2001-01-01

    This paper describes a control system for the heavy object handling manipulator. It has been developed for the blanket module remote maintenance system of ITER (International Thermonuclear Fusion Experimental Reactor). A rail-mounted vehicle-type manipulator is proposed for the precise handling of a blanket module which is about 4 tons in weight. Basically, this manipulator is controlled by teaching-playback technique. When grasping or releasing the module, the manipulator sags and the position of the end-effector changes about 50 [mm]. Applying only the usual teaching-playback control makes the smooth operation of setting/removing modules to/from the vacuum vessel wall difficult due to this position change. To solve this proper problem of heavy object handling manipulator, we have developed a system which uses motion patterns generated from two kinds of teaching points. These motion patterns for setting/removing heavy objects are generated by combining teaching points for positioning the manipulator with and without grasping the object. When these motion patterns are applied, the manipulator can transfer the object's weight smoothly at the setting/removing point. This developed system has been applied to the real-scale mock-up of the vehicle manipulator and through the actual module setting/removing experiments, we have verified its effectiveness and realized smooth maintenance operation. (author)

  6. The remote handling systems for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Isabel, E-mail: mir@isr.ist.utl.pt [Institute for Systems and Robotics/Instituto Superior Tecnico, Lisboa (Portugal); Damiani, Carlo [Fusion for Energy, Barcelona (Spain); Tesini, Alessandro [ITER Organization, Cadarache (France); Kakudate, Satoshi [ITER Tokamak Device Group, Japan Atomic Energy Agency, Ibaraki (Japan); Siuko, Mikko [VTT Systems Engineering, Tampere (Finland); Neri, Carlo [Associazione EURATOM ENEA, Frascati (Italy)

    2011-10-15

    The ITER remote handling (RH) maintenance system is a key component in ITER operation both for scheduled maintenance and for unexpected situations. It is a complex collection and integration of numerous systems, each one at its turn being the integration of diverse technologies into a coherent, space constrained, nuclearised design. This paper presents an integrated view and recent results related to the Blanket RH System, the Divertor RH System, the Transfer Cask System (TCS), the In-Vessel Viewing System, the Neutral Beam Cell RH System, the Hot Cell RH and the Multi-Purpose Deployment System.

  7. Remote controlled transport device

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Ito, Akira; Tada, Eisuke; Sato, Masaki

    1998-01-01

    The present invention provides a device for transporting equipments for maintenance and parts between a maintenance port and a facility for maintenance by remote control in a radioactive material handling facility such as a nuclear power plant. Namely, a power supply bus bar is disposed along a transferring path in order to supply power to a transporting means, and is divided into every region having a predetermined length. Each of the power supply bus bar regions is controlled for the power supply by a control device. Accordingly, the transporting means can be moved and driven successively being independent on every power supply bus bar region. Accordingly, a plurality of transporting means can be operated independently in a transferring path without laying around power cables and control signal cables. (I.S.)

  8. Object and operation supported maintenance for mining equipment

    Directory of Open Access Journals (Sweden)

    Walter Bartelmus

    2014-09-01

    Full Text Available The paper aroused in answer to discussion in Mining Magazine (MM September 2011 and July/August 2013. The paper shows that discussion given in the MM issue July/August 2013 does not fulfill expectations expressed in MM issue 2011. The presented paper is the review on maintenance that is based on condition monitoring as tool for detection of faults and failure prevention. Fault and failure are regarded as inevitable during the machine operation as the process of wear and the process of degradation. The question is, if one can influence the wear and degradation process, using condition monitoring. The paper will present technology (in reference to cited papers which demonstrates that the use of the proper method can influence the wear and machine degradation process, using proper condition monitoring techniques and knowing scenarios of wear and degradation process, the maintenance can be rationalized. The presented paper shows possible improvements which are needed to fulfill expectations expressed in MM September 2011 and they are not taken into consideration in MM July/August 3013. These improvements can be fulfilling on the bases of object and operation supported maintenance.

  9. A training simulator ensures the competence of operating and maintenance staff

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L. [ed.

    1997-11-01

    IVO Generation Services Ltd (IGS) has overall responsibility made on the basis of long-term contracts for the operation and maintenance of the customers` power plants. Partnership is the key concept, and customers are thus able to concentrate on their own specific business activities. Research and development projects are primarily aimed at cutting the customer`s power generation costs and at increasing the efficiency of operation and maintenance

  10. Human factors in operational maintenance on future naval vessels

    NARCIS (Netherlands)

    Post, W.M.; Schreurs, J.C.; Rakhorst-Oudendijk, M.L.W.; Badon Ghijben, N.A.; Diggelen, J. van

    2014-01-01

    The increasing complexity of operational maintenance on naval platforms and the need to sustain this also in battle conditions are in conflict with the requirement for crew reduction. This asks for a new approach. The Netherlands MoD knows how to develop technical solutions for operational

  11. Remote handling techniques in decommissioning - A report of the NEA Co-operative Programme on Decommissioning (CPD) project

    International Nuclear Information System (INIS)

    Borchardt, Ralf; Denissen, Luc; Desbats, Philippe; Jeanjacques, Michel; Nokhamzon, Jean-Guy; Valentin, Pierre; Slater, Steve; Valencia, Luis; Wittenauer, Stephan; Yamauchi, Toyoaki; Burton, Bob

    2011-01-01

    operating and control system should be user-friendly. Controls should be well laid out, with ergonomics suitable for numerous personnel with differing levels of experience, and normal operations should be logical and easy to execute. System parameters and alarm indicators must be accessible and easy to evaluate and respond to. - The equipment must be able to perform all tasks within its capabilities safely, effectively and efficiently with little downtime and no failures that would jeopardize personnel safety or place the system or task in a non-recoverable position. - The system must be flexible and easily adapted to changing conditions, tooling requirements and operational needs. - The system must truly be remotely operated. Adequate distance or shielding must be available to operators such that exposures to radiation, hazardous materials and conditions are minimized. - Preventive maintenance must be minimal with only moderate to long term frequencies (minimum 3 to 6 months) under normal or expected operating conditions. When the need arises, the maintenance should be simple and straightforward with a duration of less than one work shift. Replacement parts and common wear items should be available at a reasonable cost. - Reliability is of paramount importance. Downtime and system or component failures translate into additional costs, possible personnel exposure, and if unexpected, possible safety impact. - The systems, if possible, should be able to perform remote tasks nearly as rapidly as conventional practices would allow or have the ability to perform tasks that would otherwise be difficult, impossible or impractical to perform

  12. Man-rem exposure--a forcing function in remote maintenance of nuclear plants

    International Nuclear Information System (INIS)

    Erion, T.L.

    1979-01-01

    The purpose of this paper is to show the need for remote tooling systems in order to comply with the proposed NRC strategies relative to occupational radiation exposure (ORE) during maintenance outages. In addition to developing tooling to help or remove man from a radiation environment, present efforts to make that environment a less hostile one in the future are underway. A program to decontaminate the channelhead is underway. The obvious benefit of reducing the radiation source strength, and therefore man-rem exposure, has been indicated. Specialized tooling for local decontamination purposes, development of an advanced computer-controlled manipulator, and comprehensive personnel training programs can all reduce downtime and personnel exposures

  13. A web-based remote radiation treatment planning system using the remote desktop function of a computer operating system: a preliminary report.

    Science.gov (United States)

    Suzuki, Keishiro; Hirasawa, Yukinori; Yaegashi, Yuji; Miyamoto, Hideki; Shirato, Hiroki

    2009-01-01

    We developed a web-based, remote radiation treatment planning system which allowed staff at an affiliated hospital to obtain support from a fully staffed central institution. Network security was based on a firewall and a virtual private network (VPN). Client computers were installed at a cancer centre, at a university hospital and at a staff home. We remotely operated the treatment planning computer using the Remote Desktop function built in to the Windows operating system. Except for the initial setup of the VPN router, no special knowledge was needed to operate the remote radiation treatment planning system. There was a time lag that seemed to depend on the volume of data traffic on the Internet, but it did not affect smooth operation. The initial cost and running cost of the system were reasonable.

  14. Remote handling in nuclear fusion research

    International Nuclear Information System (INIS)

    Removille, J.

    1989-01-01

    When the Joint European Torus (JET) commences operation in 1992, the neutron flux will increase by 2 or 3 orders of magnitude activating the components of the machine to such an extent as to prohibit the access of personnel into the machine hall to carry out maintenance tasks. This paper lists operations which will have to be carried out remotely either because they are essential to the routine running of the machine or in emergencies. Remotely operated equipment which has been developed to perform these tasks is described. It is based on a system of conveyors which carry manipulators and tools to their point of operation. The principal conveyors are: a telescopic articulated mast carried on a bridge over the machine enabling tasks around and above the torus to be performed; conveyors running on rails which can reach otherwise inaccessible regions beneath the machine; an articulated arm which can position a manipulator within the torus; and a radio controlled support vehicle running on caterpillar tracks carrying a camera and tools for connecting cables to other conveyors. The main features of the control room from which the conveyors, manipulators, tools and cameras are remotely operated is also described. (UK)

  15. Maintenance and availability considerations for MFTF-B upgrade

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1983-01-01

    The upgrade of the Mirror Fusion Test Facility (MFTF-B) tandem mirror device incorporates the operation of advanced systems plus the requirement for remote maintenance. To determine if the operating availability goal of this device is achievable, an assessment of component lifetimes was made, along with estimates of device downtime. Key subsystem components were considered from the magnet, heating, impurity control, pumping, and test module systems. Component replacements were grouped into three categories, and a lifetime operating plan, including component replacements, was developed. It was determined that this device could achieve a 10% operating availability

  16. 47 CFR 78.51 - Remote control operation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Remote control operation. 78.51 Section 78.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... shall also be equipped with suitable devices for observing the overall characteristics of the...

  17. Mockup testing of remote systems for zirconium fuel dissolution process at the Idaho Chemical Processing Plant

    International Nuclear Information System (INIS)

    Paige, D.M.

    1979-01-01

    A facility is being constructed at the Idaho National Engineering Laboratory for storage and dissolution of spent zirconium reactor fuels. The dissolution is carried out in chemical type equipment contained in a large shielded cell. The design provides for remote operations and maintenance as required. Equipment predicted to fail within 5 years is designed for remote maintenance. Each system was fabricated for mockup testing using readily available materials. The mockups were tested, redesigned, and retested until satisfactory remote designs were achieved. Records were made of all the work. All design changes were then incorporated into the ongoing detailed design for the actual equipment. Several of these systems are discussed and they include valve replacement, pump replacement, waste solids handling, mechanism operations and others. The mockup program has saved time and money by eliminating many future problems. In addition, the mockup program will continue through construction, cold startup, and hot operations

  18. Operation and maintenance support expert systems for BWR nuclear power plants

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo; Hayakawa, Hiroyasu; Fukutomi, Shigeki

    1990-01-01

    Toshiba has been developing expert systems for operation and maintenance support in BWRs. These expert systems are designed to be integrated with conventional plant monitoring systems, and maintenance management systems to provide both comprehensive and powerful support capabilities. Some of these expert systems are already being used on a trial basis both within Toshiba and in electric power utility companies. This paper describes expert systems for the support of plant and equipment monitoring, maintenance scheduling, and maintenance work procedure planning. (author)

  19. Conceptual design studies of special-purpose equipment for Fusion Engineering Device torus-sector remote maintenance

    International Nuclear Information System (INIS)

    Masson, L.S.; Watts, K.D.; Aldrich, W.E.; McPherson, R.S.

    1982-01-01

    One of the major maintenance operations anticipated for fusion reactors of the Tokamak configuration is remote removal and replacement of torus sectors. This operation will be difficult due to the massive nature of the sector (375 tonnes), and also due to the precision with which it must be positioned within the fixed structure. The same problem, only to a lesser degree, applies to sub-components of the sector such as the limiter blades, shielding, test assemblies, etc. General and specific design requirements have been generated and trade studies conducted on reactor interfacing details as well as handling machine concepts. On the basis of the design requirements and trade studies, a perferred concept for the sector handling machine was developed. In addition, a similar machine was developed for handling the intermediate sized sector sub-components. While most operations will be performed by special purpose machines such as described above, there is a need for a versatile, relatively high capacity mobile system. A concept suitable for this mobile application was also developed as part of these studies. The general conclusion, to the extent these studies have been completed, was that special single-purpose machines will be required to perform the operations requiring high load capacity and handling precision. The machine concepts developed were felt to be within the state-of-the-art, and will make extensive use of commercially available components. The most serious problem was felt to be development of simple methods to obtain the required precision in positioning massive objects such as the torus sector

  20. Maintenance and operations cost model for DSN subsystems

    Science.gov (United States)

    Burt, R. W.; Lesh, J. R.

    1977-01-01

    A procedure is described which partitions the recurring costs of the Deep Space Network (DSN) over the individual DSN subsystems. The procedure results in a table showing the maintenance, operations, sustaining engineering and supportive costs for each subsystems.

  1. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    Science.gov (United States)

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  2. RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System

    Science.gov (United States)

    Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.

    2008-08-01

    RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.

  3. Planning for maintenance in radiochemical facilities [Paper No.: VB-2

    International Nuclear Information System (INIS)

    Balasubramanian, G.R.

    1981-01-01

    Reprocessing facilities in the earlier stages of development were planned mainly based on the concept of direct maintenance in view of the inherent advantage of man-machine interface and initial savings in the investment costs. With the mechanical processes finding a firm place in head-end operation and increase in down time necessary for elaborate decontamination efforts even for a minor modification has led to the review of the concept. For the same reason, the recent plants are based on the concept of harmonious blend of both direct and remote maintenance. The paper describes the planning needed from consideration of various aspects related to such concepts of maintenance during different phases of such type of facilities, highlighting some of the tools and special equipments to be developed for this purpose. A brief description of recent development in the field of remote maintenance is also given. Though the basic hot facility of reference is the one of reprocessing fast reactor fuels, the concepts and systems discussed are equally applicable to other radiochemical and radiometallurgical facilities also. (author)

  4. Service and Maintenance - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Soederberg, David; Weisbach, Henrik (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-11-15

    This report aims to provide information of, and experiences from, service and maintenance of Lillgrund Offshore Wind Farm. The report deals with operation and maintenance (O and M) during construction, commissioning and the first three months of operation. Focus has been to describe the organization and cooperation between Vattenfall and Siemens. Experiences have been collected by interviews with representatives from Siemens and Vattenfall. The O and M strategy defined by Lillgrund's service and maintenance contract are based on a gradual take over of O and M. Siemens will be responsible for maintenance of Lillgrund during the first five years. During this five-year period, Vattenfall will build up its own maintenance organization for Lillgrund. The first three years, Vattenfall's technicians are supposed to form 30 % of the total number of maintenance technicians. The fourth and fifth year, the corresponding amount should be 50 %. During daytime, Lillgrund is operated locally. During nights and weekends, it is operated remotely by Vattenfall's operating centre in Esbjerg. The major O and M experience from Lillgrund is the need for good administrative and technical information systems. These systems should be implemented as soon as possible because of the large amounts of documentation that are created during the commissioning phase. The technical information systems must be able to present historic data of measurements in order to see trends and analyse faults

  5. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  6. survey of operators kn and maintenance o in ebonyi st vey

    African Journals Online (AJOL)

    eobe

    o access the operators' knowledge of operation and maintenance of farm to access the operators' .... other factors hinder agricultural mechanization in Nigeria. Ebonyi State is an agrarian area, hence, the ... MATERIALS AND METHODS. 2.

  7. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Greg; Pugh, Ray; Melendez, Aldo P.; Hunt, W. D.

    2010-08-04

    This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

  8. Development of HWVP melter/turntable components for canyon-remote maintenance and replacement

    International Nuclear Information System (INIS)

    Siemens, D.H.; Beary, M.M.; Berger, D.N.; Heath, W.O.; Larson, D.E.

    1985-03-01

    Remote operability and maintainability of vitrification equipment were assessed under shielded-cell conditions. The equipment tested will be applied to immobilize high-level and transuranic liquid waste slurries that resulted from plutonium production for defense weapons. Equipment tested included: (1) a turntable for handling waste canisters under the melter; (2) a removable discharge cone in the melter overflow section; (3) a thermocouple jumper that extends into a shielded cell; (4) remote instrument and electrical connectors; (5) remote, mechanical, and heat transfer aspects of the melter glass overflow section; (6) a reamer to clean out plugged nozzles in the melter top; (7) a closed circuit camera to view the melter interior; and (8) a device to retrieve samples of the glass product. 14 figs

  9. Improved remote HEPA filtration development program

    International Nuclear Information System (INIS)

    Wilson, C.E. III.

    1987-03-01

    This paper presents a summary of the prototype development and hot cell mock-up testing program undertaken to adapt a commercial remote HEPA filter housing for use in the Process Facility Modification Project (PFMP). This program was initiated in response to the project design criteria and documentation that required the air from the hot cell environment to be exhausted through three stages of HEPA filtration. Due to the anticipated quantity of radioactive contamination captured by the first stage of filters, it was determined that the first stage would need to be located in a remotely operated and maintained shielded cell adjoining the primary hot cell areas. Commercially available remote filtration equipment was evaluated and candidate unit was identified, which could be developed into a suitable filter housing. A candidate unit was obtained from Flanders Filters, Inc. and a series of hot cell mock-up tests were identified in the 305 facility at the Hanford site. The results of these tests, and further interaction with the vendor, led to a prototype remote filter housing which satisfied most PFMP criteria and proved to be significantly superior to existing commercial units for remote operation/maintenance

  10. Design and implementation of wormlike creeping mobile robot for EAST remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Qiang, E-mail: zhangqiang@iim.ac.cn [Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Department of Automation, University of Science and Technology of China, Hefei, Anhui 230026 (China); Zhou, Ling [Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Wang, Zengfu, E-mail: zfwang@ustc.edu.cn [Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Department of Automation, University of Science and Technology of China, Hefei, Anhui 230026 (China)

    2017-05-15

    Highlights: • Wormlike creeping robot walking on the V-shaped circular slot in EAST fusion vessel. • Mobile platform to carry equipments or assist manipulators for maintenance tasks. • Chain structure design with n(n ≥ 2) creeping units each of which has three segments. • Creeping gait planning to construct a multi-axis coordinating control scheme. • Evaluation and verification of basic motion performance and mechanical properties. - Abstract: Maintenance for nuclear fusion vessel is crucial, yet it faces great difficulty due to the complex internal physical and geometric conditions. Since the limitation on inherent strength, load, size, etc, a manipulator robot can only complete very limited tasks. Robotic arm systems for remote operation such as JET and MPD can carry certain tools to complete a variety of operating tasks, but it is difficult to achieve the system which is very complex. Therefore, if the inherent idea of using a single robot to complete the specified functions can change, it is possible to make the problems simpler and easier to solve by adding auxiliary robots working together with the robotic arm systems to complete the assigned tasks. Under the above background, based on the deeply analyzing and refining the functional requirements of the vessel operation robot, proceeding from the perspective of ability to move and carry a certain operating device, this paper presents a wormlike creeping mobile robot walking on the V-shaped circular slot inside a nuclear fusion vessel such as EAST (Experimental Advanced Superconducting Tokamak). We have designed and implemented the principle prototype of the robot which has chain structure with n (n ≥2) creeping units. Each creeping unit is of three-part structure, which consists of fore segment, mid segment and back segment connected by bidirectional universal joint. The fore and back segments stretch the paws to contact the surface of V-shaped slot, while the mid segment realizes the overall

  11. Design and implementation of wormlike creeping mobile robot for EAST remote maintenance system

    International Nuclear Information System (INIS)

    Zhang, Qiang; Zhou, Ling; Wang, Zengfu

    2017-01-01

    Highlights: • Wormlike creeping robot walking on the V-shaped circular slot in EAST fusion vessel. • Mobile platform to carry equipments or assist manipulators for maintenance tasks. • Chain structure design with n(n ≥ 2) creeping units each of which has three segments. • Creeping gait planning to construct a multi-axis coordinating control scheme. • Evaluation and verification of basic motion performance and mechanical properties. - Abstract: Maintenance for nuclear fusion vessel is crucial, yet it faces great difficulty due to the complex internal physical and geometric conditions. Since the limitation on inherent strength, load, size, etc, a manipulator robot can only complete very limited tasks. Robotic arm systems for remote operation such as JET and MPD can carry certain tools to complete a variety of operating tasks, but it is difficult to achieve the system which is very complex. Therefore, if the inherent idea of using a single robot to complete the specified functions can change, it is possible to make the problems simpler and easier to solve by adding auxiliary robots working together with the robotic arm systems to complete the assigned tasks. Under the above background, based on the deeply analyzing and refining the functional requirements of the vessel operation robot, proceeding from the perspective of ability to move and carry a certain operating device, this paper presents a wormlike creeping mobile robot walking on the V-shaped circular slot inside a nuclear fusion vessel such as EAST (Experimental Advanced Superconducting Tokamak). We have designed and implemented the principle prototype of the robot which has chain structure with n (n ≥2) creeping units. Each creeping unit is of three-part structure, which consists of fore segment, mid segment and back segment connected by bidirectional universal joint. The fore and back segments stretch the paws to contact the surface of V-shaped slot, while the mid segment realizes the overall

  12. Design considerations, tooling, and equipment for remote in-service inspection of radioactive piping and pressure-vessel systems

    International Nuclear Information System (INIS)

    Swannack, D.L.; Schmoker, D.S.

    1983-01-01

    This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor-system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  13. The remote maintenance of mechanically attached first wall armour tiles in NET

    International Nuclear Information System (INIS)

    Reeve, T.; Shaw, R.; Suppan, A.; Haferkamp, B.

    1991-01-01

    Protection of a substantial proportion of the NET First Wall (FW) with low-Z armour is envisaged for at least the early operating period of the machine. This armour will take the form of carbon tiles directly attached to the FW. Complete coverage of the FW will require the installation of 20 000-40 000 tiles. The uncertainties existing in FW operating conditions make it difficult to predict the lifetime of the armour components. However, based on present experience, a number of component failures is to be expected in addition to the general wear by plasma erosion. Bearing in mind the hostile environment within the machine, the remote maintainability of these components is thus of fundamental importance and has strongly influenced their design. Mechanical attachment is considered to be the only viable approach for remotely maintainable armour tiles. A series of tools for mounting and demounting such tiles is currently under development at KfK, Karlsruhe. Handling trials are being carried out on a local FW mock-up to optimise the tile attachment designs for efficient remote handling, to provide input to the overall system design and to facilitate the progressive evolution of effective remote handling tools. Such, tools will subsequently be tested in conjunction with The NET Articulated Boom prototype articulated boom transporter to prove their fitness for purpose. The paper reports the current status of this work and outlines the design and principles of operation of the tools developed. The results and conclusions of the investigations to date, including any practical modifications considered necessary to either the original tile attachment arrangements or the preliminary tool designs, are presented. The philosophy behind the attachment and detachment procedures envisaged is also described. (orig.)

  14. Guidelines for safe process operations and maintenance

    CERN Document Server

    2010-01-01

    First-line managers have to maintain the integrity of facilities, control manufacturing processes, and handle unusual or emergency situations, as well as respond to the pressures of production demand. On a daily basis, they are closest to the operating personnel who may be injured by a process accident, and they are in the best position to spot problem conditions and to act to contain them. This book offers these managers ""how-to"" information on process safety management program execution in the operations and maintenance departments, recommending technical and administrative process safety

  15. Remote methods for decontamination and decommissioning operations

    International Nuclear Information System (INIS)

    DeVore, J.R.

    1986-01-01

    Three methods for the decontamination and decommissioning of nuclear facilities are described along with operational experience associated with each method. Each method described in some way reduces radiation exposure to the operating personnel involved. Electrochemical decontamination of process tanks is described using an in-situ method. Descriptions of two processes, electropolishing and cerium redox decontamination, are listed. A method of essentially smokeless cutting of process piping using a plasma-arc cutting torch is described. In one technique, piping is cut remotely from a distance using a specially modified torch holder. In another technique, cutting is done with master-slave manipulators inside a hot cell. Finally, a method for remote cutting and scarification of contaminated concrete is described. This system, which utilizes high-pressure water jets, is coupled to a cutting head or rotating scarification head. The system is suited for cutting contaminated concrete for removal or removing a thin layer in a controlled manner for decontamination. 4 refs., 6 figs

  16. Remote methods for decontamination and decommissioning operations

    International Nuclear Information System (INIS)

    DeVore, J.R.

    1986-01-01

    Three methods for the decontamination and decommissioning of nuclear facilities are described along with operational experience associated with each method. Each method described in some way reduces radiation exposure to the operating personnel involved. Electrochemical decontamination of process tanks is described using an in-situ method. Descriptions of two processes, electropolishing and cerium redox decontamination, are listed. A method of essentially smokeless cutting of process piping using a plasma-arc cutting torch is described. In one technique, piping is cut remotely from a distance using a specially modified torch holder. In another technique, cutting is done with master-slave manipulators inside a hot cell. Finally, a method for remote cutting and scarification of contaminated concrete is described. This system, which utilizes high-pressure water jets, is coupled to a cutting head or rotating scarification head. The system is suited for cutting contaminated concrete for removal or removing a thin layer in a controlled manner for decontamination

  17. Remote Decommissioning Experiences at Sellafield

    International Nuclear Information System (INIS)

    Brownridge, M.

    2006-01-01

    British Nuclear Group has demonstrated through delivery of significant decommissioning projects the ability to effectively deploy innovative remote decommissioning technologies and deliver cost effective solutions. This has been achieved through deployment and development of off-the-shelf technologies and design of bespoke equipment. For example, the worlds first fully remotely operated Brokk was successfully deployed to enable fully remote dismantling, packaging and export of waste during the decommissioning of a pilot reprocessing facility. British Nuclear Group has also successfully implemented remote decommissioning systems to enable the decommissioning of significant challenges, including dismantling of a Caesium Extraction Facility, Windscale Pile Chimney and retrieval of Plutonium Contaminated Material (PCM) from storage cells. The challenge for the future is to continue to innovate through utilization of the supply chain and deploy off-the-shelf technologies which have been demonstrated in other industry sectors, thus reducing implementation schedules, cost and maintenance. (authors)

  18. Remote systems requirements of the high-yield lithium injection fusion energy converter concept

    International Nuclear Information System (INIS)

    Walker, P.E.

    1978-01-01

    Remote systems will be required in the high-yield lithium injection fusion energy converter power plant proposed by Lawrence Livermore Laboratory. During inspection operations, viewing of the chamber interior and certain pumps, valve fittings, and welds must be done remotely. Ideas for remote maintenance of laser-beam blast baffles, optics, and target material traps are described. Radioisotope sources, their distributions, and exposure rates at various points in the reactor vicinity are presented

  19. UNC Nuclear Industries' human-factored approach to the operating or maintenance procedure

    International Nuclear Information System (INIS)

    Nelson, A.A.; Clark, J.E.

    1982-01-01

    The development of Human Factors Engineering (HFE) and UNC Nuclear Industries' (UNC) commitment to minimizing the potential for human error in the performance of operating or maintenance procedures have lead to a procedure upgrade program. Human-factored procedures were developed using information from many sources including, but not limited to, operators, a human factors specialist, engineers and supervisors. This has resulted in the Job Performance Aid (JPA). This paper presents UNC's approach to providing human-factored operating and maintenance procedures

  20. Lessons learned from the Maintenance Rule implementation at Northeast Utilities operating plants

    International Nuclear Information System (INIS)

    Hastings, K.B.; Khalil, Y.F.; Johnson, W.

    1996-01-01

    The Maintenance Rule as described in 10CFR50.65 requires holders of all operating nuclear power plants to monitor the performance of structures, systems, and components (SSCs) against licensee-established performance criteria. The Industry with the assistance of the Nuclear Energy Institute (NEI) developed a guideline, which includes all parts of the Maintenance Rule, to establish these performance criteria while incorporating safety and reliability of the operating plants. The NUMARC 93-01 Guideline introduced the term ''Risk Significant'' to categorize subsets of the SSCs which would require increased focus, from a Maintenance Rule perspective, in setting their performance criteria. Northeast Utilities Company (NU) operates five nuclear plants three at Millstone Station in Waterford, Connecticut; the Connecticut Yankee plant in Haddam Neck, Connecticut; and the Seabrook Station in Seabrook, New Hampshire. NU started the implementation process of the Maintenance Rule program at its five operating plants since early 1994, and have identified a population of risk significant SSCs at each plant. Recently, Northeast Utilities' Maintenance Rule Team re-examined the initial risk significant determinations to further refine these populations, and to establish consistencies among its operating units. As a result of the re-examination process, a number of inconsistencies and areas for improvement have been identified. The lessons learned provide valuable insights to consider in the future as one implements more risk based initiatives such as Graded QA and Risk-Based ISI and IST. This paper discusses the risk significance criteria, how Northeast Utilities utilized NUMARC 93-01 Guideline to determine the risk significant SSCs for its operating plants, and lessons learned. The results provided here do not include the Seabrook Station

  1. Operational programs in forest management and priority in the utilization of remote sensing

    Science.gov (United States)

    Douglass, R. W.

    1978-01-01

    A speech is given on operational remote sensing programs in forest management and the importance of remote sensing in forestry is emphasized. Forest service priorities in using remote sensing are outlined.

  2. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  3. Influence of visual feedback on human task performance in ITER remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Schropp, Gwendolijn Y.R., E-mail: g.schropp@heemskerk-innovative.nl [Utrecht University, Utrecht (Netherlands); Heemskerk Innovative Technology, Noordwijk (Netherlands); Heemskerk, Cock J.M. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Kappers, Astrid M.L.; Tiest, Wouter M. Bergmann [Helmholtz Institute-Utrecht University, Utrecht (Netherlands); Elzendoorn, Ben S.Q. [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM/FOM, Partner in the Trilateral Euregio Clusterand ITER-NL, PO box 1207, 3430 BE Nieuwegein (Netherlands); Bult, David [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM/FOM, Partner in the Trilateral Euregio Clusterand ITER-NL, PO box 1207, 3430 BE Nieuwegein (Netherlands)

    2012-08-15

    Highlights: Black-Right-Pointing-Pointer The performance of human operators in an ITER-like test facility for remote handling. Black-Right-Pointing-Pointer Different sources of visual feedback influence how fast one can complete a maintenance task. Black-Right-Pointing-Pointer Insights learned could be used in design of operator work environment or training procedures. - Abstract: In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures. Additional verification and validation is based on simulation and hardware tests in 1:1 scale mockups. The Master Slave manipulator system (MS2) Benchmark Product was designed to implement a reference set of maintenance tasks representative for ITER remote handling. Experiments were performed with two versions of the Benchmark Product. In both experiments, the quality of visual feedback varied by exchanging direct view with indirect view (using video cameras) in order to measure and analyze its impact on human task performance. The first experiment showed that both experienced and novice RH operators perform a simple task significantly better with direct visual feedback than with camera feedback. A more complex task showed a large variation in results and could not be completed by many novice operators. Experienced operators commented on both the mechanical design and visual feedback. In a second experiment, a more elaborate task was tested on an improved Benchmark product. Again, the task was performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance.

  4. Influence of visual feedback on human task performance in ITER remote handling

    International Nuclear Information System (INIS)

    Schropp, Gwendolijn Y.R.; Heemskerk, Cock J.M.; Kappers, Astrid M.L.; Tiest, Wouter M. Bergmann; Elzendoorn, Ben S.Q.; Bult, David

    2012-01-01

    Highlights: ► The performance of human operators in an ITER-like test facility for remote handling. ► Different sources of visual feedback influence how fast one can complete a maintenance task. ► Insights learned could be used in design of operator work environment or training procedures. - Abstract: In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures. Additional verification and validation is based on simulation and hardware tests in 1:1 scale mockups. The Master Slave manipulator system (MS2) Benchmark Product was designed to implement a reference set of maintenance tasks representative for ITER remote handling. Experiments were performed with two versions of the Benchmark Product. In both experiments, the quality of visual feedback varied by exchanging direct view with indirect view (using video cameras) in order to measure and analyze its impact on human task performance. The first experiment showed that both experienced and novice RH operators perform a simple task significantly better with direct visual feedback than with camera feedback. A more complex task showed a large variation in results and could not be completed by many novice operators. Experienced operators commented on both the mechanical design and visual feedback. In a second experiment, a more elaborate task was tested on an improved Benchmark product. Again, the task was performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance.

  5. Remote state preparation using positive operator-valued measures

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Siendong, E-mail: sdhuang@mail.ndhu.edu.tw [Department of Applied Mathematics, National Dong Hwa University, Hualien 974, Taiwan (China)

    2013-02-04

    We consider the process of remote state preparation using a pure state |ψ〉 with the maximal Schmidt number n. For any given state σ, pure or mixed, a construction of a positive operator-valued measure {M_j}{sub j=0}{sup n} is provided. The classical outcome j=0 indicates the failure of a remote preparation of σ. All other classical outcomes j>0 correspond to unitary transformations of the receiver system such that σ can be prepared. The total probability of successful remote preparation depends on the state σ. Our protocol is a variation of conclusive teleportation and the classical bits required for this protocol are given by log{sub 2}(n+1), which is nearly half that of conclusive teleportation.

  6. Enhanced design, operation and maintenance practices for a longer plant service life

    International Nuclear Information System (INIS)

    Raimondo, E.; Courcoux, A.

    2004-01-01

    Plant service life problems have been under detailed investigation in France and the experience acquired by our company over the past 25 years in the design, construction and maintenance of Pressurized Water Reactors has contributed to develop skills, equipment and capabilities available for efficient plant aging management and component service life extension. The service life of a nuclear power plant is deeply dependant of the provisions made during the design stage, directly linked to good operating conditions and adequate maintenance practices. This paper presents the importance of these three steps (design, operation and maintenance) for plant service life concern. (author)

  7. New Trends in the Outsourcing of Maintenance/Operation Services

    CERN Document Server

    Wilhelmsson, M

    2001-01-01

    The contracting-experience of maintenance/operation work in our group can today be considered as rich with the first generation of contract implemented more than 15 years ago. The incumbent contract was started in 1997, so it is now into its 4th year. Certain improvements that have already been implemented has had a large impact on our contract culture e.g. performance indicators. The next re-tendering is now approaching and with this borne in mind, the author will discuss through various sections of this report the following main points: firstly, an overview of the trends today in this area; secondly, comparing these trends with implemented practices; and finally, what can be future development in the outsourcing of the maintenance/operation of the Cooling & Ventilation services.

  8. Network communication for remote technology and NDT controls on current nuclear power plants

    International Nuclear Information System (INIS)

    Capitaine, A.

    2001-01-01

    Among the most important targets for ''UTILITIES'' are to increase nuclear power plant availability and reduce the workers dosimetry. A possible way to reach these targets is to reduce the duration of the refueling period and to limit the number of operators in the work areas It is necessary to use remote technology and to provide much equipment to support the main activities during refueling. Remote technology is a possible solution to remove operators from the maintenance area. The main activities concerned are the NDT inspection on the primary components and fuel handling system. Recent progress on remote technology made by the electronic industry and network communication has increased their capacities. It is easier now to use them, and more and more people are familiar with these technologies. Internet, manufacturing, supervision, and surgery use these technologies. Now it seems appropriate to examine these technologies for current maintenance in nuclear plants. Remote technologies and communication network can help to solve current difficulties in the maintenance field and dosimetry limits. For a long time, many people thought that the cost and the difficulty of applying new technologies would be not extremely expensive, but this is no longer the case. Now with the first feed back we can show that these technologies are a good answer for increased availability and reduction of dosimetry. (author)

  9. Network communication for remote technology and NDT controls on current nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Capitaine, A. [Electricite de France, 92 - Clamart (France). Service Etudes et Projets Thermiques et Nucleaires

    2001-07-01

    Among the most important targets for ''UTILITIES'' are to increase nuclear power plant availability and reduce the workers dosimetry. A possible way to reach these targets is to reduce the duration of the refueling period and to limit the number of operators in the work areas It is necessary to use remote technology and to provide much equipment to support the main activities during refueling. Remote technology is a possible solution to remove operators from the maintenance area. The main activities concerned are the NDT inspection on the primary components and fuel handling system. Recent progress on remote technology made by the electronic industry and network communication has increased their capacities. It is easier now to use them, and more and more people are familiar with these technologies. Internet, manufacturing, supervision, and surgery use these technologies. Now it seems appropriate to examine these technologies for current maintenance in nuclear plants. Remote technologies and communication network can help to solve current difficulties in the maintenance field and dosimetry limits. For a long time, many people thought that the cost and the difficulty of applying new technologies would be not extremely expensive, but this is no longer the case. Now with the first feed back we can show that these technologies are a good answer for increased availability and reduction of dosimetry. (author)

  10. NPP operation and maintenance with french-built NPPs

    International Nuclear Information System (INIS)

    Mira, J.J.

    1987-01-01

    In Frace, 80% of the electricity production will be nuclear in 1990. More than to-day, PWR units will be operated by ELECTRICITE DE FRANCE on a load-follow basis. Every effort is made to reduce planned and forced outages. Maintenance is shared between EDF and FRAMATOME, the latter being in charge of high technology operations. All these actions are eased by the standardization of units, within each power class, the resulting build-up of experience being available to all PWR operators in the world, more particularly to those of FRAMATOME-built units

  11. Constraints to private sector operation: maintenance of municipal infrastructure

    CSIR Research Space (South Africa)

    Wall, K

    2012-08-01

    Full Text Available This paper discusses the potential of the private sector to take medium- or longterm responsibility for the operation and/or maintenance of elements of infrastructure owned by municipalities....

  12. Completely contained and remotely operated digital density meter

    International Nuclear Information System (INIS)

    Goergen, C.R.

    1979-10-01

    A completely contained and remotely operated density determination system having unique features was designed, fabricated, and installed at the Savannah River Plant. The system, based on a Mettler calculating digital density meter, provides more precise and accurate results than the falling drop technique for measuring densities. The system is fast, simple, easy to operate, and has demonstrated both reliability and durability

  13. Advanced remote handling developments for high radiation applications

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Feldman, M.J.; Kuban, D.P.; Martin, H.L.; Rowe, J.C.; Hamel, W.R.

    1985-01-01

    The Remote Control Engineering Task of the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, and installation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  14. 43 CFR 404.55 - Who is responsible for the operation, maintenance, and replacement costs?

    Science.gov (United States)

    2010-10-01

    ... Miscellaneous § 404.55 Who is responsible for the operation, maintenance, and replacement costs? You will be responsible for 100 percent of the operation, maintenance, and replacement costs for any rural water facility... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who is responsible for the operation...

  15. Application of remote handling compatibility on ITER plant

    International Nuclear Information System (INIS)

    Sanders, S.; Rolfe, A.; Mills, S.F.; Tesini, A.

    2011-01-01

    The ITER plant will require fully remote maintenance during its operational life. For this to be effective, safe and efficient the plant will have to be developed in accordance with remote handling (RH) compatibility requirements. A system for ensuring RH compatibility on plant designed for Tokamaks was successfully developed and applied, inter alia, by the authors when working at the JET project. The experience gained in assuring RH compatibility of plant at JET is now being applied to RH relevant ITER plant. The methodologies required to ensure RH compatibility of plant include the standardization of common plant items, standardization of RH features, availability of common guidance on RH best practice and a protocol for design and interface review and approval. The protocol in use at ITER is covered by the ITER Remote Maintenance Management System (IRMMS) defines the processes and utilization of management controls including Plant Definition Forms (PDF), Task Definition Forms (TDFs) and RH Compatibility Assessment Forms (RHCA) and the ITER RH Code of Practice. This paper will describe specific examples where the authors have applied the methodology proven at JET to ensure remote handling compatibility on ITER plant. Examples studied are: ·ELM coils (to be installed in-vessel behind the Blanket Modules) - handling both in-vessel, in Casks and at the Hot Cell as well as fully remote installation and connection (mechanical and electrical) in-vessel. ·Neutral beam systems (in-vessel and in the NB Cell) - beam sources, cesium oven, beam line components (accessed in the NB Cell) and Duct Liner (remotely replaced from in-vessel). ·Divertor (in-vessel) - cooling pipe work and remotely operated electrical connector. The RH compatibility process can significantly affect plant design. This paper should therefore be of interest to all parties who develop ITER plant designs.

  16. Control-limit preventive maintenance policies for components subject to imperfect preventive maintenance and variable operational conditions

    International Nuclear Information System (INIS)

    You Mingyi; Li Hongguang; Meng Guang

    2011-01-01

    This paper develops two component-level control-limit preventive maintenance (PM) policies for systems subject to the joint effect of partial recovery PM acts (imperfect PM acts) and variable operational conditions, and investigates the properties of the proposed policies. The extended proportional hazards model (EPHM) is used to model the system failure likelihood influenced by both factors. Several numerical experiments are conducted for policy property analysis, using real lifetime and operational condition data and typical characterization of imperfect PM acts and maintenance durations. The experimental results demonstrate the necessity of considering both factors when they do exist, characterize the joint effect of the two factors on the performance of an optimized PM policy, and explore the influence of the loading sequence of time-varying operational conditions on the performance of an optimized PM policy. The proposed policies extend the applicability of PM optimization techniques.

  17. Maintenance Operations Degradation of Airfield Pavement Markings

    Science.gov (United States)

    2012-03-01

    DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED The views expressed in this article are those of the author and...DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED AFIT/GEM/ENV/12-M09 MAINTENANCE OPERATIONS DEGRADATION OF...placement, color, and style (Federal Aviation Adminstration (FAA), 2010). However, regulations and standards do not make good asset management plans

  18. Davis PV plant operation and maintenance manual

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  19. PORTFOLIO OF POTENTIAL STRATEGIES IN AERONAUTIC MAINTENANCE

    International Nuclear Information System (INIS)

    Rolet, S.

    2010-01-01

    EADS divisions aim more and more at developing services associated to their platforms. EADS divisions, like Airbus and Eurocopter, are investigating on services associated to their platforms in order to add them value. One possible service consists in structural maintenance operation assistance, especially for NDT operations performed by the customer. EADS Innovation Works envisages three different and complementary enhanced structural maintenance categories. Enhanced NDT improves standard NDT operation environment. This is made possible by the existence of 'smart' NDT tools that are computer based and therefore able to support other functions. These functions range from local smart data processing and display to remote expert assisted operation. Passive Sensor Network relies on sensors permanently installed on aircraft structure. Interrogation of sensors is performed on ground and off line (while structure is not loaded except by its own weight). It can be done at arbitrary times in order to determine structure health. The aim is to give easy access to some hidden ''hot spots,'' to reduce human factor in structure health assessment and optimize maintenance. Structural Health Monitoring goes a step beyond Passive Sensor Network, because interrogation units are on board the aircraft and may be connected to aircraft network. It allows to use on-line techniques such as adapted acoustic emission and to automatically raise an alarm when a defect appears in the structure. This paper presents these different ways of improving structural maintenance operations in service, with their respective advantages and limitations.

  20. Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair

    Energy Technology Data Exchange (ETDEWEB)

    1983-12-30

    This is the initial issue of the guidebook. Since a guidebook of this type must incorporate information concerning a wide range of subjects, much additional data will eventually be included. The guidebook will document, in summary and easily referenceable form, data, designs, design concepts, design guidelines and background information useful to the FWBS and to the Maintenance System designer. In providing guidelines for the AMR of the FWBS, the guidebook must, of necessity, include guidelines for all aspects of maintenance associated with the FWBS. These include most maintenance operations within the reactor room necessary to gain access, identify faults, and handle equipment related to FWBS maintenance. In addition, the guidelines include those required to define facility requirements for handling and repair of FWBS and related reactor components external to the reactor room. Particular emphasis is given to remote maintenance design and operations.

  1. SUMO: operation and maintenance management web tool for astronomical observatories

    Science.gov (United States)

    Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa

    2014-08-01

    SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.

  2. Association of remote dexterity and remote lifting for maintenance in fuel reprocessing industry

    International Nuclear Information System (INIS)

    Streiff, G.; Auchapt, P.; Vertut, J.

    1984-01-01

    The MA23M is an articulated bilateral servomanipulator with theoretically unlimited distance between master and slave stations. The last developments being carried on enable its good utilization in the large cells that will exist in the next reprocessing plants. Recent developments concerning computer aided operations like automatic TV tracking of the effector and manipulative assistance of MA23 and transporter enable realistic application in the large cells of the future reprocessing plants. In another hand manipulator containment, transfer and maintenance, in a glove box have been demonstrated. Concerning the in-cell process equipment to be maintained, extensive testing has shown that the association with a hoist is an excellent trade off in power and dexterity enabling solution of practically all expected or unexpected operations. According to the in-cell machinery and to the difficulty of the operation, one or two dextrous arms can be associated with one hoist. Dismantling of machines or dismantling of the whole facility will be possible by developing special tooling handled by the dextrous manipulator or, if too heavy, oriented by the manipulator but suspended to the hoist

  3. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  4. Environmental management system for transportation maintenance operations : [technical brief].

    Science.gov (United States)

    2014-04-01

    This report provides the framework for the environmental management system to analyze : greenhouse gas emissions from transportation maintenance operations. The system enables user : to compare different scenarios and make informed decisions to minim...

  5. Development of wireless vehicle remote control for fuel lid operation

    Science.gov (United States)

    Sulaiman, N.; Jadin, M. S.; Najib, M. S.; Mustafa, M.; Azmi, S. N. F.

    2018-04-01

    Nowadays, the evolution of the vehicle technology had made the vehicle especially car to be equipped with a remote control to control the operation of the locking and unlocking system of the car’s door and rear’s bonnet. However, for the fuel or petrol lid, it merely can be opened from inside the car’s cabin by handling the fuel level inside the car’s cabin to open the fuel lid. The petrol lid can be closed by pushing the lid by hand. Due to the high usage of using fuel lever to open the fuel lid when refilling the fuel, the car driver might encounter the malfunction of fuel lid (fail to open) when pushing or pulling the fuel lever. Thus, the main aim of the research is to enhance the operation of an existing car remote control where the car fuel lid can be controlled using two techniques; remote control-based and smartphone-based. The remote control is constructed using Arduino microcontroller, wireless sensors and XCTU software to set the transmitting and receiving parameters. Meanwhile, the smartphone can control the operation of the fuel lid by communicating with Arduino microcontroller which is attached to the fuel lid using Bluetooth sensor to open the petrol lid. In order to avoid the conflict of instruction between wireless systems with the existing mechanical-based system, the servo motor will be employed to release the fuel lid merely after receiving the instruction from Arduino microcontroller and smartphone. As a conclusion, the prototype of the multipurpose vehicle remote control is successfully invented, constructed and tested. The car fuel lid can be opened either using remote control or smartphone in a sequential manner. Therefore, the outcome of the project can be used to serve as an alternative solution to solve the car fuel lid problem even though the problem rarely occurred.

  6. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  7. A CNES remote operations center for the MSL ChemCam instrument

    Energy Technology Data Exchange (ETDEWEB)

    Wiens, Roger C [Los Alamos National Laboratory; Lafaille, Vivian [CNES; Lorgny, Eric [CNES; Baroukh, Julien [CNES; Gaboriaud, Alain [CNES; Saccoccio, Muriel [CNES; Perez, Rene [CNES; Gasnault, Olivier [CNRS/CESR; Maurice, Sylvestre [CNRS/CESR; Blaney, Diana [JPL

    2010-01-01

    For the first time, a CNES remote operations center in Toulouse will be involved in the tactical operations of a Martian rover in order to operate the ChemCam science instrument in the framework of the NASA MSL (Mars Science Laboratory) mission in 2012. CNES/CESR and LANL have developed and delivered to JPL the ChemCam (Chemistry Camera) instrument located on the top of mast and in the body of the rover. This instrument incorporates a Laser-Induced Breakdown Spectrometer (LIBS) and a Remote Micro-Imager (RMI) for determining elemental compositions of rock targets or soil samples at remote distances from the rover (2-7 m). An agreement has been achieved for operating ChemCam, alternatively, from Toulouse (FR) and Los Alamos (NM, USA), through the JPL ground data system in Pasadena (CA, USA) for a complete Martian year (2 years on Earth). After a brief overview of the MSL mission, this paper presents the instrument, the mission operational system and JPL organization requirements for the scientific investigators (PI and Co-Is). This paper emphasizes innovations applied on the ground segment components and on the operational approach to satisfy the requirements and constraints due to these shared and distributed operations over the world.

  8. 49 CFR 195.402 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operating conditions by monitoring pressure, temperature, flow or other appropriate operational data and...) Minimization of public exposure to injury and probability of accidental ignition by assisting with evacuation... SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.402 Procedural...

  9. Franchising partnerships for roads engineering infrastructure operation and maintenance

    CSIR Research Space (South Africa)

    Wall, K

    2008-07-01

    Full Text Available This is a presentation delivered at the 27th SATC (Southern African Transport Conference) conference 2008, focusing on franchising principles and applying these principles to water services infrastructure, operation and maintenance...

  10. Education and training of operators and maintenance staff at Hamaoka Nuclear Power Stations

    International Nuclear Information System (INIS)

    Makido, Hideki; Hayashi, Haruhisa

    1999-01-01

    At Hamaoka Nuclear Power Station, in order to ensure higher safety and reliability of plant operation, education and training is provided consistently, on a comprehensive basis, for all operating, maintenance and other technical staff, aimed at developing more capable human resources in the nuclear power division. To this end, Hamaoka Nuclear Power Station has the 'Nuclear Training Center' on its site. The training center provides the technical personnel including operators and maintenance personnel with practical training, utilizing simulators for operation training and the identical facilities with those at the real plant. Thus, it plays a central role in promoting comprehensive education and training concerning nuclear power generation. Our education system covers knowledge and skills necessary for the safe and stable operation of nuclear power plant, targeting new employees to managerial personnel. It is also organized systematically in accordance with experience and job level. We will report the present education and training of operators and maintenance personnel at Hamaoka Nuclear Training Center. (author)

  11. Advantages and limitations of remotely operated sea floor drill rigs

    Science.gov (United States)

    Freudenthal, T.; Smith, D. J.; Wefer, G.

    2009-04-01

    A variety of research targets in marine sciences including the investigation of gas hydrates, slope stability, alteration of oceanic crust, ore formation and palaeoclimate can be addressed by shallow drilling. However, drill ships are mostly used for deep drillings, both because the effort of building up a drill string from a drill ship to the deep sea floor is tremendous and control on drill bit pressure from a movable platform and a vibrating drill string is poor especially in the upper hundred meters. During the last decade a variety of remotely operated drill rigs have been developed, that are deployed on the sea bed and operated from standard research vessels. These developments include the BMS (Bentic Multicoring System, developed by Williamson and Associates, operated by the Japanese Mining Agency), the PROD (Portable Remotely Operated Drill, developed and operated by Benthic Geotech), the Rockdrill 2 (developed and operated by the British geological Survey) and the MeBo (German abbreviation for sea floor drill rig, developed and operated by Marum, University of Bremen). These drill rigs reach drilling depths between 15 and 100 m. For shallow drillings remotely operated drill rigs are a cost effective alternative to the services of drill ships and have the major advantage that the drilling operations are performed from a stable platform independent of any ship movements due to waves, wind or currents. Sea floor drill rigs can be deployed both in shallow waters and the deep sea. A careful site survey is required before deploying the sea floor drill rig. Slope gradient, small scale topography and soil strength are important factors when planning the deployment. The choice of drill bits and core catcher depend on the expected geology. The required drill tools are stored on one or two magazines on the drill rig. The MeBo is the only remotely operated drill rig world wide that can use wire line coring technique. This method is much faster than conventional

  12. Remote systems requirements of the High Yield Lithium Injection Fusion Energy (HYLIFE) converter concept

    International Nuclear Information System (INIS)

    Walker, P.E.

    1978-10-01

    Remote systems will be required in the High Yield Lithium Injection Fusion Energy Converter power plant proposed by Lawrence Livermore Laboratory. During inspection operations, viewing of the chamber interior and certain pumps, valve fittings and welds must be done remotely. Ideas for remote maintenance of laser beam blast baffles, optics, and target material traps are described. Radioisotope sources and their distributions, and exposure rates at various points in the reactor vicinity are presented

  13. A remote control system to offer information for nuclear power plant operation

    International Nuclear Information System (INIS)

    Ohga, Yukiharu; Yuchi, Hiroyuki; Arita, Setsuo

    1995-01-01

    A new man-machine system was proposed to simplify input operation so as to get needed plant information and to control information items and output devices for the operator crew, working in a control room. The system controls the shared information for the operator crew, on a large screen display, and private information for individual operators and maintenance personnel, on CRTs, based on the speech input and remote pointing input to the large screen display by a portable pointer, which emits laser beams. The system recognizes the indicating point of the pointer beam by processing the image on the large screen as obtained by an ITV camera. An infrared laser beam and a camera with a visible ray cut filter are used to remove distortion of the image caused by lens aberration, etc. and to provide rapid image processing. The operator performs the input operation while monitoring a cursor displayed by the system. The information items offered and their output devices are automatically determined according to the input operator. A prototype system was developed using three CRTs, one of which served as a substitute for the large screen display. Input to the system is performed using a speech input device and three kinds of pointers; each pointer is identified during image processing based on the number of laser beams emitted. The evaluation test confirmed that precise and smooth input by pointers as well as arbitrary combinations with speech input realized natural dialog without being aware of any waiting time. The appropriate information items were offered to output devices, CRTs and the speech output device, according to the pointers used, namely the input operators. The system can simplify input operation and effectively control the offered information items and output devices in a plant control room. (author)

  14. Remotely Operated Train for Inspection and Measurement in CERN's LHC Tunnel

    CERN Document Server

    Kershaw, K; Bestmann, P; Feniet, T; Forkel-Wirth, D; Grenard, J L; Rousset, N

    2010-01-01

    Personnel access to the LHC tunnel will be restricted to varying extents during the life of the machine due to radiation and cryogenic hazards. For this reason a remotely operated modular inspection train, (TIM) running on the LHC tunnel’s overhead monorail has been developed. In order to be compatible with the LHC personnel access system, a small section train that can pass through small openings at the top of sector doors has now been produced. The basic train can be used for remote visual inspection; additional modules give the capability of carrying out remote measurement of radiation levels, environmental conditions around the tunnel, and even remote measurement of the precise position of machine elements such as collimators. The paper outlines the design, development and operation of the equipment including preparation of the infrastructure. Key features of the trains are described along with future developments and intervention scenarios.

  15. Best Practices in Photovoltaic System Operations and Maintenance: 2nd Edition

    Energy Technology Data Exchange (ETDEWEB)

    Whaley, Cass [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-12-01

    This best practices guide encourages high-quality system deployment and operation that improves lifetime project performance and energy production while reducing, or at least optimizing, costs to deliver an operation and maintenance program.

  16. Design of a MGy radiation tolerant resolver-to-digital convertor IC for remotely operated maintenance in harsh environments

    Energy Technology Data Exchange (ETDEWEB)

    Leroux, Paul, E-mail: paul.leroux@kuleuven.be [KU Leuven, Dept. of Electrical Engineering (ESAT), AdvISe, Kleinhoefstraat 4, 2440 Geel (Belgium); Van Koeckhoven, Wesley; Verbeeck, Jens [KU Leuven, Dept. of Electrical Engineering (ESAT), AdvISe, Kleinhoefstraat 4, 2440 Geel (Belgium); Van Uffelen, Marco; Esqué, Salvador; Ranz, Roberto; Damiani, Carlo [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France)

    2014-10-15

    During future ITER maintenance operations, sensors and their embarked electronics will be exposed to a hostile and radioactive environment. This paper presents the design of a MGy radiation tolerant 16 bit resolver-to-digital converter (RDC) in 130 nm CMOS technology. The RDC features a Type II digital tracking loop, able to track resolvers with speeds up to 300 rps, and excitation frequencies up to 4 kHz. The RDC uses two integrated ΔΣ-analog-to-digital converters (ADCs) to digitize the resolver outputs. The 16 bit, 10 kHz ADCs utilize a correlated double sampling technique to remove radiation induced offset and 1/f-noise. The front-end features a static angular resolution of 16 bits (4.2 arcsec{sub rms}) and a resolution of 10 bits (6 arcmin{sub rms}) at a rotor speed of 100 rps. The circuit has a simulated radiation tolerance exceeding 1 MGy. It has the ability to operate under temperatures up to 125 °C, and to allow multiplexing with signals from other conventional sensors for compact, robust read-out architectures.

  17. Operation and maintenance manual of the accelerator installed in the facility of radiation standards

    International Nuclear Information System (INIS)

    Fujii, Katsutoshi; Kawasaki, Katsuya; Kowatari, Munehiko; Tanimura, Yoshihiko; Kajimoto, Yoichi; Shimizu, Shigeru

    2006-08-01

    4MV Van de Graff accelerator was installed in the Facility of Radiation Standards (FRS) in June 2000, and monoenergetic neutron calibration fields and high energy γ-ray calibration fields have been developed. The calibration fields are provided for R and D on dosimetry, and for the calibration and type-test of radiation protection instruments. This article describes the operational procedure, the maintenance work and the operation of the related apparatuses of the accelerator. This article focuses on the sufficient safety and radiation control for the operators, the maintenance performance of the accelerator, and on the prevention of the malfunction due to the mistakes of the operators. This article targets the unexperienced engineers in charge of operation and maintenance of the accelerator. (author)

  18. REMOTE OPERATION OF THE WEST COAST AND ALASKA TSUNAMI WARNING CENTER

    Directory of Open Access Journals (Sweden)

    Alec H. Medbery

    2002-01-01

    Full Text Available The remote control of real time derivation of earthquake location and magnitude and the issuance of tsunami and earthquake bulletins was done using off-the-shelf remote control software and hardware. Such remote operation of the West Coast/Alaska Tsunami Warning Center can decrease the time needed to respond to an earthquake by eliminating travel from the duty standers’ home to the tsunami warning center.

  19. Aging management and preventive maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    Bessho, Toichi; Sagawa, Wataru; Oyamada, Osamu; Uchida, Shunsuke

    1995-01-01

    It is expected that nuclear power generation will bear main electric power supply for long term. For this purpose, by applying proper preventive maintenance to the nuclear power plants in operation, the maintenance of high reliability and the rate of plant operation is extremely important. Especially it has been strongly demanded to execute efficiently the periodic inspection which is carried out every year to shorten its period and increase the rate of operation, and to maintain the reliability by the proper maintenance for the aged plants with long operation years. As to efficient and short periodic inspection, the preparation is advanced by the guidance of electric power companies aiming at realizing it in nearest fiscal year, and further, effort is exerted for the development of technology in long term to optimize periodic inspection. For securing the reliability of aged plants, it is important to do proper inspection and diagnosis and to take the countermeasures by repair and replacement, based on the grasp of secular change mechanism and the evaluation of life of machinery, equipment and materials. In particular, effort is exerted for the development of maintenance technology for reactor pressure vessels and in-core equipment which are hard to access. The confirmation of the function of remote operation equipment and the establishment of execution condition are carried out by uisng the full scale mock-up of BWR plant. The problems in maintenance service and the activities and results of reliability improvement are reported. (K.I.)

  20. 49 CFR 214.355 - Training and qualification in on-track safety for operators of roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...

  1. Ship Operations, Maintenance, Repair and Upgrade for the R/V KILO MOANA

    Science.gov (United States)

    2017-07-20

    From - To) 07/20/2017 Final Technical Report 03/19/2014 to 03/31/2017 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Ship Operations, Maintenance , Repair...NUMBER Office of Research Services 2440 Campus Road , Box 368 Honolulu, Hawai’i 96822-2234 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10...Office of Naval Research. 15. SUBJECT TERMS Research vessel, operation, maintenance , repair. 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF a

  2. Maintenance and disassembly considerations for the Technology Demonstration Facility

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1983-01-01

    The Technology Demonstration Facility (TDF) is a tandem-mirror design concept carried out under the direction of Lawrence Livermore National Laboratory. It was conceived as a near-term device with a mission of developing engineering technology in a D-T fusion environment. Overall maintenance and component disassembly were among the responsibilities of the Fusion Engineering Design Center (FEDC). A configuration evolved that was based on the operational requirements of the components, as well as the requirements for their replacements. Component lifetime estimates were used to estimate the frequency and the number of replacements. In addition, it was determined that the need for remote handling equipment followed within 1.5 years after initial start-up, emphasizing the direct relationship between developing maintenance scenarios/equipment and the device configuration. Many of the scheduled maintenance operations were investigated to first order, and preliminary handling equipment concepts were developed

  3. Experience of remote under water handling operations at Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Agarwal, S.K.

    1990-01-01

    Each Refuelling outage of Tarapur Atomic Power Station Reactors involves a great deal of remote underwater handling operations using special remote handling tools, working deep down in the reactor vessel under about sixty feet of water and in the narrow confines of highly radioactive core. The remote underwater handling operations include incore and out of core sipping operations, fuel reloading or shuffling, uncoupling of control rod drives, replacement and shuffling of control blades, replacement of local power range monitors, spent fuel shipment in casks, retrieval of fallen or displaced fuel top guide spacers, orifices and their installation, underwater CCTV inspection of reactor internals, core verification, channelling and dechannelling of fuel bundles, inspection of fuel bundles and channels, unbolting and removal of old racks, installation of high density racks, removal and reinstallation of fuel support plugs and guide tubes, underwater cutting of irradiated hardware material and their disposal, fuel reconstitution, removal and reinstallation of system dryer separator etc.. The paper describes in brief the salient experience of remote underwater handling operations at TAPS especially the unusual problems faced and solved, by using special tools, employing specific techniques and by repeated efforts, patience, ingenuity and skills. (author). 10 figs

  4. A new remote control room for tokamak operations

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, D.P., E-mail: schissel@fusion.gat.com [General Atomics, P.O. Box 85608, San Diego, CA (United States); Abla, G.; Flanagan, S.; Kim, E.N. [General Atomics, P.O. Box 85608, San Diego, CA (United States)

    2012-12-15

    This paper presents a summary of a new remote tokamak control room constructed near the offices of DIII-D's scientific staff. This integrated system combines hardware, software, data, and control of the room (R-232) into a unified package that has been designed and constructed in a generic fashion so that it can be used with any tokamak operating worldwide. The room is approximately 300 ft{sup 2} and can accommodate up to 12 seated participants. Mounted on the wall facing each scientist are five 52 Double-Prime LCD televisions and mounted to the wall on their right are six 24 Double-Prime LCD monitors. Each seat has associated with it a 24 Double-Prime monitor, network connection, and power and the scientist is either provided with a computer or they can use their own. The room has been used for operation of DIII-D, EAST, and KSTAR. Due to the long distances, data from EAST and KSTAR was brought back to local DIII-D computers in one large parallel network transfer and subsequently served to scientists in the remote control room to other US collaborators. This parallel data transfer allowed the data to be available to US participants between pulses making remote experimental participation highly effective.

  5. Assessment of reliability and maintenance of motor operated valves at Finnish NPPS

    International Nuclear Information System (INIS)

    Laakso, K.; Haenninen, S.; Simola, K.

    1994-01-01

    This paper summarizes two studies on motor operated valve (MOV) failure and maintenance experiences in Finnish nuclear power plants. In the first study, described in section 2 of this paper, the failure reports of MOVs at Finnish BWR units from a nine years' time period were analyzed in a systematic way. The dominant failure mechanisms were identified and time-dependencies in failure occurrence were studied. This study initiated an experience based reliability centered maintenance (RCM) analysis of motor operated valve drives, which is summarized in chapter 3 of this paper. The RCM analysis resulted in the identification and proposal of the most suitable and effective maintenance tasks for consideration. 9 refs, 3 figs, 1 tab

  6. Standard guide for mechanical drive systems for remote operation in hot cell facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 Intent: 1.1.1 The intent of this standard is to provide general guidelines for the design, selection, quality assurance, installation, operation, and maintenance of mechanical drive systems used in remote hot cell environments. The term mechanical drive systems used herein, encompasses all individual components used for imparting motion to equipment systems, subsystems, assemblies, and other components. It also includes complete positioning systems and individual units that provide motive power and any position indicators necessary to monitor the motion. 1.2 Applicability: 1.2.1 This standard is intended to be applicable to equipment used under one or more of the following conditions: 1.2.1.1 The materials handled or processed constitute a significant radiation hazard to man or to the environment. 1.2.1.2 The equipment will generally be used over a long-term life cycle (for example, in excess of two years), but equipment intended for use over a shorter life cycle is not excluded. 1.2.1.3 The ...

  7. Mobile robotics for CANDU maintenance

    International Nuclear Information System (INIS)

    Lipsett, M.G.; Rody, K.H.

    1996-01-01

    Although robotics researchers have been promising that robotics would soon be performing tasks in hazardous environments, the reality has yet to live up to the hype. The presently available crop of robots suitable for deployment in industrial situations are remotely operated, requiring skilled users. This talk describes cases where mobile robots have been used successfully in CANDU stations, discusses the difficulties in using mobile robots for reactor maintenance, and provides near-term goals for achievable improvements in performance and usefulness. (author) 5 refs., 2 ills

  8. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  9. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  10. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  11. Artificial Intelligent Platform as Decision Tool for Asset Management, Operations and Maintenance.

    Science.gov (United States)

    2018-01-04

    An Artificial Intelligence (AI) system has been developed and implemented for water, wastewater and reuse plants to improve management of sensors, short and long term maintenance plans, asset and investment management plans. It is based on an integrated approach to capture data from different computer systems and files. It adds a layer of intelligence to the data. It serves as a repository of key current and future operations and maintenance conditions that a plant needs have knowledge of. With this information, it is able to simulate the configuration of processes and assets for those conditions to improve or optimize operations, maintenance and asset management, using the IViewOps (Intelligent View of Operations) model. Based on the optimization through model runs, it is able to create output files that can feed data to other systems and inform the staff regarding optimal solutions to the conditions experienced or anticipated in the future.

  12. Virtual reality applications in remote handling development for tokamaks in India

    International Nuclear Information System (INIS)

    Dutta, Pramit; Rastogi, Naveen; Gotewal, Krishan Kumar

    2017-01-01

    Highlights: • Evaluation of Virtual Reality (VR) in design and operation phases of Remote Handling (RH) equipment for tokamak. • VR based centralized facility, to cater RH development and operation, is setup at Institute for Plasma Research, India. • The VR facility system architecture and components are discussed. • Introduction to various VR applications developed for design and development of tokamak RH equipment. - Abstract: A tokamak is a plasma confinement device that can be used to achieve magnetically confined nuclear fusion within a reactor. Owing to the harsh environment, Remote Handling (RH) systems are used for inspection and maintenance of the tokamak in-vessel components. As the number of in-vessel components requiring RH maintenance is large, physical prototyping of all strategies becomes a major challenge. The operation of RH systems poses further challenge as all equipment have to be controlled remotely within very strict accuracy limits with minimum reliance on the available camera feedback. In both design and operation phases of RH equipment, application of Virtual Reality (VR) becomes imperative. The scope of this paper is to introduce some applications of VR in the design and operation cycle of RH, which are not available commercially. The paper discusses the requirement of VR as a tool for RH equipment design and operation. The details of a comprehensive VR facility that has been established to support the RH development for Indian tokamaks are also presented. Further, various cases studies are provided to highlight the utilization of this VR facility within phases of RH development and operation.

  13. Virtual reality applications in remote handling development for tokamaks in India

    Energy Technology Data Exchange (ETDEWEB)

    Dutta, Pramit, E-mail: pramitd@ipr.res.in; Rastogi, Naveen; Gotewal, Krishan Kumar

    2017-05-15

    Highlights: • Evaluation of Virtual Reality (VR) in design and operation phases of Remote Handling (RH) equipment for tokamak. • VR based centralized facility, to cater RH development and operation, is setup at Institute for Plasma Research, India. • The VR facility system architecture and components are discussed. • Introduction to various VR applications developed for design and development of tokamak RH equipment. - Abstract: A tokamak is a plasma confinement device that can be used to achieve magnetically confined nuclear fusion within a reactor. Owing to the harsh environment, Remote Handling (RH) systems are used for inspection and maintenance of the tokamak in-vessel components. As the number of in-vessel components requiring RH maintenance is large, physical prototyping of all strategies becomes a major challenge. The operation of RH systems poses further challenge as all equipment have to be controlled remotely within very strict accuracy limits with minimum reliance on the available camera feedback. In both design and operation phases of RH equipment, application of Virtual Reality (VR) becomes imperative. The scope of this paper is to introduce some applications of VR in the design and operation cycle of RH, which are not available commercially. The paper discusses the requirement of VR as a tool for RH equipment design and operation. The details of a comprehensive VR facility that has been established to support the RH development for Indian tokamaks are also presented. Further, various cases studies are provided to highlight the utilization of this VR facility within phases of RH development and operation.

  14. Toward autonomous operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Kitamura, M.

    1994-01-01

    Issues toward realization of autonomous operation as well as maintenance of nuclear power plants are reviewed in this paper. First, the necessity and significance of the technical program aiming at the establishment of autonomous nuclear plant are discussed through reviewing the history and current status computerized operation of complex artifacts. Then, key technologies currently studied to meet the need within the framework of artificial intelligence (AI) and advanced robotics are described. Among such AI-technologies are distributed multi-agent system, operator thinking model, and advanced man-machine interface design. Advances in robot technology attained include active sensing technique and multi-unit autonomous maintenance robot systems. Techniques for simulation of human action have been pursued as basic issues for understanding mechanisms behind human behavior. In addition to the individual developments, methodological topics relevant to the autonomy of nuclear facilities are briefly addressed. The concepts called methodology diversity and dynamic functionality restoration (realization) are introduced and discussed as the underlining principles to be considered in the development of the autonomous nuclear power plants. (author)

  15. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  16. Operations and maintenance costs - Selected observations

    International Nuclear Information System (INIS)

    Kirk, M.W.

    1991-01-01

    The operations and maintenance (O and M) costs associated with nuclear power plants have been rising continuously over the past decade. The Nuclear Management and Resources Council (NUMARC) has undertaken an examination of this issue to determine what components of O and M costs are driven by regulatory activity. Observers from various perspectives within the nuclear industry have cited staffing, outages, training, and management structure among others as large contributors to O and M costs. NUMARC is currently analyzing utility cost data to isolate the regulatory components for further action

  17. Remote control of restricted sets of operations: Teleportation of angles

    International Nuclear Information System (INIS)

    Huelga, S.F.; Vaccaro, J.A.; Plenio, M.B.

    2002-01-01

    We study the remote implementation of a unitary transformation on the state of a qubit. We show the existence of nontrivial protocols (i.e., using less resources than bidirectional state teleportation) that allow the perfect remote implementation of certain continuous sets of quantum operations. We prove that, up to a local change of basis, only two subsets exist that can be implemented remotely with a nontrivial protocol: Arbitrary rotations around a fixed direction n-vector and a π rotation about an arbitrary direction lying in a plane orthogonal to n-vector. The former operations effectively constitute the teleportation of arbitrary angles. The overall classical information and distributed entanglement cost required for the remote implementation depends on whether it is known, a priori, in which of the two teleportable subsets the transformation belongs. If it is known, the optimal protocol consumes one e-bit of entanglement and one c-bit in each direction. If it is not known in which subset the transformation belongs, two e-bits of entanglement need to be consumed and the classical channel becomes asymmetric with two c-bits being conveyed from Alice to Bob but only one from Bob to Alice

  18. Preliminary concept design of the divertor remote handling system for DEMO power plant

    Energy Technology Data Exchange (ETDEWEB)

    Carfora, D., E-mail: dario.carfora@gmail.com [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland); Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); ENEA/CREATE/University of Naples Federico II, 80125 Naples (Italy); Di Gironimo, G. [ENEA/CREATE/University of Naples Federico II, 80125 Naples (Italy); Järvenpää, J. [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland); Huhtala, K. [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Määttä, T.; Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland)

    2014-11-15

    Highlights: • Concept design of the RH system for the DEMO fusion power plant. • Divertor Mover: Hydraulic telescopic boom concept design. An alternative solution to ITER rack and pinion divertor mover (CMM). • Divertor cassettes end effector studies. • Transportation cask conceptual studies and logistic. - Abstract: This paper is based on the remote maintenance system project (WPRM) for the demonstration fusion power reactor (DEMO). Following ITER, DEMO aims to confirm the capability of generating several hundred of MW of net electricity by 2050. The main objective of these activities is to develop an efficient and reliable remote handling (RH) system for replacing the divertor cassettes. This paper presents the preliminary results of the concept design of the divertor RH system. The proposed divertor mover is a hydraulic telescopic boom driven from the transportation cask through the maintenance tunnel of the reactor. The boom is divided in three sections of 4 m each, and it is driving an end-effector in order to perform the scheduled operations of maintenance inside the vacuum vessel. Two alternative design of the end effector to grip and manipulate the divertor cassette are also presented in this work. Both the concepts are hydraulically actuated, basing on the ITER previous studies. The divertor cassette end-effector consists of a lifting arm linked to the divertor mover, a tilting plate, a cantilever arm and a hook-plate. The main objective of this paper is to illustrate the feasibility of DEMO divertor remote maintenance operations.

  19. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    Science.gov (United States)

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  20. Artificial intelligence applications for operation and maintenance

    International Nuclear Information System (INIS)

    Itoh, M.; Tai, I.; Monta, K.; Sekimizu, K.

    1987-01-01

    A nuclear power plant as a typical man-machine system of the modern industry needs an efficient human window through which operators can observe every necessary detail of the plant for its safe and reliable operation. Much efforts have been devoted to the development of the computerized operator support systems (COSS). Recent development of artificial intelligence (AI) seems to offer new possibility to strengthen the performance of the COSS such as more powerful diagnosis and procedure synthesis and user friendly man-machine interfaces. From this point of view, a national project of Advanced Man-Machine System Development for Nuclear Power Plants has been carried out. Artificial intelligence application to nuclear power plant operation and maintenance is also selected as a major theme for the promotion of research and development on frontiers in the recently revised long term national program for development and utilization of nuclear energy in JAPAN