  1. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  2. A Perspective on Equipment Design for Fusion Remote Handling

    International Nuclear Information System (INIS)

    Mills, S.; Haist, B.; Hamilton, D.

    2006-01-01

    For 8 years, JET remote operations have become more capable and confident. Many tasks have been successfully completed, even those never intended to be remote maintenance activities. The general approach to the provision of remote handling equipment at JET has been the preferred use of commercially-off-the-shelf equipment. In the areas of electrical, electronic, software and control this approach has been generally achievable. However, in the area of mechanical equipment it has been more difficult. In particular the RH tooling has been almost entirely bespoke as its requirements are highly sensitive to the design of the JET component being handled and there are many design variations. Hence, JET has required the design and manufacture of over 700 types of bespoke RH equipment. This paper will discuss the experience of introducing and developing remote handling mechanical equipment for JET. The paper will cover the relationship between the remote handling equipment and the JET component design and the potential for improving the design function. A major lesson from the introduction of remote handling to JET has been demonstration of the very close interdependency of the design of JET components with design of remote handling tooling. The JET remote handling manual was originally introduced as the vehicle to ensure remote handling compatibility by the introduction of standards. Experience has shown that in general the remote handling manual approach has been insufficient. Future fusion machines will be much more complex than JET and will demand even greater remote handling compatibility. This paper will discuss possible methods for improving this process. Equipment operating in a high radiation environment must be dependable It may spend part of its time in areas that would be extremely difficult to recover from in the case of failure. The equipment may also have a high duty cycle to minimise shutdown times and probably cannot be manually inspected on a frequent

  3. Remote operational trials with the ITER FDR divertor handling equipment

    International Nuclear Information System (INIS)

    Irving, M.; Baldi, L.; Benamati, G.; Galbiati, L.; Giacomelli, S.; Lorenzelli, L.; Micciche, G.; Muro, L.; Polverari, A.; Palmer, J.; Martin, E.

    2003-01-01

    The ITER divertor test platform (DTP) located at ENEA's Research Centre in Brasimone, Italy is a full-scale mock-up of a 72 deg. arc of the ITER 1998 vessel divertor region--the result of a major initiative over the period 1996-2000. Since the implementation of this facility, the design of the ITER vessel--and therefore much of the remote maintenance equipment--has changed substantially. However, the nature and principles of the remote handling equipment are still very similar, and hence many valuable lessons can yet be learned from the existing equipment for the future. In particular, true remote handling tests of the major maintenance subsystems were seen as an important step in determining their suitability for ITER. This paper describes and documents a series of three, discrete, remote-handling trials carried out using most of the major DTP subsystems, and presents an overview of the conclusions and suggestions for future development of ITER cassette remote handling equipment

  4. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  5. Remote handling equipment for SNS

    International Nuclear Information System (INIS)

    Poulten, B.H.

    1983-01-01

    This report gives information on the areas of the SNS, facility which become highly radioactive preventing hands-on maintenance. Levels of activity are sufficiently high in the Target Station Area of the SNS, especially under fault conditions, to warrant reactor technology to be used in the design of the water, drainage and ventilation systems. These problems, together with the type of remote handling equipment required in the SNS, are discussed

  6. Design of remote handling equipment for the ITER NBI

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1999-08-01

    The ITER machine has three Neutral Beam Injectors (NBIs) placed tangential to the plasma at a minimum radius of 6.25 m. During operation, neutrons produced by the D-T reactions will irradiate the NBI structure and it will become radioactive. Radiation levels will be such that all subsequent maintenance of the NBIs must be carried out remotely. The presence of tritium and possibly radioactive dust requires that precautions be taken during maintenance to prevent the escape of these contaminants beyond the prescribed boundaries. The scope of this task is both the development of remote maintenance procedures and the design of the remote handling equipment to handle the NBIs. This report describes the design of remote handling tools for the ion source and its filaments, transfer cask, maintenance time, manufacturing schedule and cost estimation. (author)

  7. ITER L 7 duct remote handling equipment design report

    International Nuclear Information System (INIS)

    Millard, J.

    1996-09-01

    The operation, design and interfaces of the 'Duct Vehicle' and it's associated remote handling equipment are briefly described in this document. This equipment is being designed by Spar Aerospace Ltd. for the Divertor Test Platform as part of ITER Research and Development Project L-7. Canadian Fusion Fuels Technology Project funds this work as part of the Canadian Contribution to ITER. This document describes the equipment design status at the September 1996 design review. 23 figs

  8. Remotely-operated equipment for inspection, measurement and handling

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2008-01-01

    As part of the application of ALARA radiation dose reduction principles at CERN, inspection, measurement and handling interventions in controlled areas are being studied in detail. A number of activities which could be carried out as remote operations have already been identified and equipment is being developed. Example applications include visual inspection to check for ice formation on LHC components or water leaks, measurement of radiation levels before allowing personnel access, measurement of collimator or magnet alignment, visual inspection or measurements before fire service access in the event of fire, gas leak or oxygen deficiency. For these applications, a modular monorail train, TIM, has been developed with inspection and measurement wagons. In addition TIM provides traction, power and data communication for lifting and handling units such as the remote collimator exchange module and vision for other remotely operated units such as the TAN detector exchange mini-cranes. This paper describes the eq...

  9. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  10. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  11. Development of a zonal applicability tool for remote handling equipment in DEMO

    Energy Technology Data Exchange (ETDEWEB)

    Madzharov, Vladimir, E-mail: vladimir.madzharov@kit.edu [Karlsruhe Institute of Technology, Institute for Material Handling and Logistics, Karlsruhe (Germany); Mittwollen, Martin [Karlsruhe Institute of Technology, Institute for Material Handling and Logistics, Karlsruhe (Germany); Leichtle, Dieter [Fusion for Energy F4E, Barcelona (Spain); Hermon, Gary [Culham Center for Fusion Energy, Culham Science Centre, OX14 3DB Abingdon (United Kingdom)

    2015-10-15

    Highlights: • Radiation-hardness assessment of remote handling (RH) components used in DEMO. • A radiation assessment tool for supporting remote handling engineers. • Connecting data from the radiation field analysis to the radiation hardness data. • Output is the expected lifetime of the selected RH component used for maintenance. - Abstract: A radiation-induced damage caused by the ionizing radiation can induce a malfunctioning of the remote handling equipment (RHE) used during maintenance in fusion power plants, other nuclear power stations and high-energy accelerators facilities like e.g. IFMIF. Therefore to achieve a sufficient length of operational time inside future fusion power plants, a suitable radiation tolerant RHE for maintenance operations in radiation environments is inevitably required. To assess the influence of the radiation on remote handling equipment (RHE), an investigation about radiation hardness assessment of typically used RHE components, has been performed. Additionally, information about the absorbed total dose that every component can withstand before failure was collected. Furthermore, the development of a zonal applicability tool for supporting RHE designers has been started using Excel VBA. The tool connects the data from the radiation field analysis (3-D radiation map) to the radiation hardness data of the planned RHE for DEMO remote maintenance. The intelligent combination of the available information for the radiation behaviour and radiation level at certain time and certain location may help with the taking of decisions about the application of RHE in radiation environment. The user inputs the following parameters: the specific device used in the RHE, the planned location and the maintenance period. The output is the expected lifetime of the selected RHE component at the given location and maintenance period. Planned action times have to be also considered. After having all the parameters it can be decided, if specific RHE

  12. Demonstration of remotely operated TRU waste size reduction and material handling equipment

    International Nuclear Information System (INIS)

    Looper, M.G.; Charlesworth, D.L.

    1988-01-01

    The Savannah River Laboratory (SRL) is developing remote size reduction and material handling equipment to prepare 238 Pu contaminated waste for permanent disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The waste is generated at the Savannah River Plant (SRP) from normal operation and decommissioning activity and is retrievably stored onsite. A Transuranic Waste Facility for preparing, size-reducing, and packaging this waste for disposal is scheduled for completion in 1995. A cold test facility for demonstrating the size reduction and material handling equipment was built, and testing began in January 1987. 9 figs., 1 tab

  13. Remote handling facility and equipment used for space truss assembly

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1987-01-01

    The ACCESS truss remote handling experiments were performed at Oak Ridge National Laboratory's (ORNL's) Remote Operation and Maintenance Demonstration (ROMD) facility. The ROMD facility has been developed by the US Department of Energy's (DOE's) Consolidated Fuel Reprocessing Program to develop and demonstrate remote maintenance techniques for advanced nuclear fuel reprocessing equipment and other programs of national interest. The facility is a large-volume, high-bay area that encloses a complete, technologically advanced remote maintenance system that first began operation in FY 1982. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the DOE, the Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan, and the US Navy in addition to the National Aeronautics and Space Administration. ACCESS truss remote assembly was performed in the ROMD facility using the Central Research Laboratory's (CRL) model M-2 servomanipulator. The model M-2 is a dual-arm, bilateral force-reflecting, master/slave servomanipulator which was jointly developed by CRL and ORNL and represents the state of the art in teleoperated manipulators commercially available in the United States today. The model M-2 servomanipulator incorporates a distributed, microprocessor-based digital control system and was the first successful implementation of an entirely digitally controlled servomanipulator. The system has been in operation since FY 1983. 3 refs., 2 figs

  14. A Perspective on Remote Handling Operations and Human Machine Interface for Remote Handling in Fusion

    International Nuclear Information System (INIS)

    Haist, B.; Hamilton, D.; Sanders, St.

    2006-01-01

    A large-scale fusion device presents many challenges to the remote handling operations team. This paper is based on unique operational experience at JET and gives a perspective on remote handling task development, logistics and resource management, as well as command, control and human-machine interface systems. Remote operations require an accurate perception of a dynamic environment, ideally providing the operators with the same unrestricted knowledge of the task scene as would be available if they were actually at the remote work location. Traditional camera based systems suffer from a limited number of viewpoints and also degrade quickly when exposed to high radiation. Virtual Reality and Augmented Reality software offer great assistance. The remote handling system required to maintain a tokamak requires a large number of different and complex pieces of equipment coordinating to perform a large array of tasks. The demands on the operator's skill in performing the tasks can escalate to a point where the efficiency and safety of operations are compromised. An operations guidance system designed to facilitate the planning, development, validation and execution of remote handling procedures is essential. Automatic planning of motion trajectories of remote handling equipment and the remote transfer of heavy loads will be routine and need to be reliable. This paper discusses the solutions developed at JET in these areas and also the trends in management and presentation of operational data as well as command, control and HMI technology development offering the potential to greatly assist remote handling in future fusion machines. (author)

  15. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  16. Remote handling demonstration of ITER blanket module replacement

    International Nuclear Information System (INIS)

    Kakudate, S.; Nakahira, M.; Oka, K.; Taguchi, K.; Obara, K.; Tada, E.; Shibanuma, K.; Tesini, A.; Haange, R.; Maisonnier, D.

    2001-01-01

    In ITER, the in-vessel components such as blanket are to be maintained or replaced remotely since they will be activated by 14 MeV neutrons, and a complete exchange of shielding blanket with breeding blanket is foreseen after the Basic Performance Phase. The blanket is segmented into about seven hundred modules to facilitate remote maintainability and allow individual module replacement. For this, the remote handing equipment for blanket maintenance is required to handle a module with a dead weight of about 4 tonne within a positioning accuracy of a few mm under intense gamma radiation. According to the ITER R and D program, a rail-mounted vehicle manipulator system was developed and the basic feasibility of this system was verified through prototype testing. Following this, development of full-scale remote handling equipment has been conducted as one of the ITER Seven R and D Projects aiming at a remote handling demonstration of the ITER blanket. As a result, the Blanket Test Platform (BTP) composed of the full-scale remote handling equipment has been completed and the first integrated performance test in March 1998 has shown that the fabricate remote handling equipment satisfies the main requirements of ITER blanket maintenance. (author)

  17. Study on compact design of remote handling equipment for ITER blanket maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi

    2006-03-01

    In the ITER, the neutrons created by D-T reactions activate structural materials, and thereby, the circumstance in the vacuum vessel is under intense gamma radiation field. Thus, the in-vessel components such as blanket are handled and replaced by remote handling equipment. The objective of this report is to study the compactness of the remote handling equipment (a vehicle/manipulator) for the ITER blanket maintenance. In order to avoid the interferences between the blanket and the equipment during blanket replacement in the restricted vacuum vessel, a compact design of the equipment is required. Therefore, the compact design is performed, including kinematic analyses aiming at the reduction of the sizes of the vehicle equipped with a manipulator handling the blanket and the rail for the vehicle traveling in the vacuum vessel. Major results are as follows: 1. The compact vehicle/manipulator is designed concentration on the reduction of the rail size and simplification of the guide roller mechanism as well as the reduction of the gear diameter for vehicle rotation around the rail. Height of the rail is reduced from 500 mm to 400 mm by a parameter survey for weight, stiffness and stress of the rail. The roller mechanism is divided into two simple functional mechanisms composed of rollers and a pad, that is, the rollers support relatively light loads during rail deployment and vehicle traveling while a pad supports heavy loads during blanket replacement. Regarding the rotation mechanism, the double helical gear is adopted, because it has higher contact ratio than the normal spur gear and consequently can transfer higher force. The smaller double helical gear, 996 mm in diameter, can achieve 26% higher output torque, 123.5 kN·m, than that of the original spur gear of 1,460 mm in diameter, 98 kN·m. As a result, the manipulator becomes about 30% lighter, 8 tons, than the original weight, 11.2 tons. 2. Based on the compact design of the vehicle/manipulator, the

  18. Overhead remote handling systems for the process facility modifications project

    International Nuclear Information System (INIS)

    Wiesener, R.W.; Grover, D.L.

    1987-01-01

    Each of the cells in the process facility modifications (PFM) project complex is provided with a variety of general purpose remote handling equipment including bridge cranes, monorail hoist, bridge-mounted electromechanical manipulator (EMM) and an overhead robot used for high efficiency particulate air (HEPA) filter changeout. This equipment supplements master-slave manipulators (MSMs) located throughout the complex to provide an overall remote handling system capability. The overhead handling equipment is used for fuel and waste material handling operations throughout the process cells. The system also provides the capability for remote replacement of all in-cell process equipment which may fail or be replaced for upgrading during the lifetime of the facility

  19. Trends in remote handling device development

    International Nuclear Information System (INIS)

    Raimondi, T.

    1991-01-01

    A brief review is given of studies on layouts and methods for handling some major components requiring remote maintenance in future fusion reactors: Neutral sources and beam lines, the blanket, divertor plates, armour tiles and vacuum pumps. Comparison is made to problems encountered in JET, methods and equipment used and development work done there. Areas requiring development and research are outlined. These include topics which are the subject of papers presented here, such as dynamic studies and control of transporters, improvements to the man-machine interface and hot cell equipment. A variety of other topics where effort is needed are also mentioned: Environmental tolerance of components and equipment, TV viewing and compensation of viewing difficulties with aids such as computer graphics and image processing, safety assessment, computer aids for remote manipulation, remote cutting and welding techniques, routine in-vessel inspection methods and selection of connectors and flanges for remote handling. (orig.)

  20. Getting to grips with remote handling and robotics

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, D [Ontario Hydro, Toronto (Canada)

    1984-12-01

    A report on the Canadian Nuclear Society Conference on robotics and remote handling in the nuclear industry, September 1984. Remote handling in reactor operations, particularly in the Candu reactors is discussed, and the costs and benefits of use of remote handling equipment are considered. Steam generator inspection and repair is an area in which practical application of robotic technology has made a major advance.

  1. Remote handling systems for the Pride application

    International Nuclear Information System (INIS)

    Kim, K.; Lee, J.; Lee, H.; Kim, S.; Kim, H.

    2010-10-01

    In this paper is described the development of remote handling systems for use in the pyro processing technology development. Remote handling systems mainly include a BDSM (Bridge transported Dual arm Servo-Manipulator) and a simulator, all of which will be applied to the Pride (Pyro process integrated inactive demonstration facility) that is under construction at KAERI. BDMS that will traverse the length of the ceiling is designed to have two pairs of master-slave manipulators of which each pair of master-slave manipulators has a kinematic similarity and a force reflection. A simulator is also designed to provide an efficient means for simulating and verifying the conceptual design, developments, arrangements, and rehearsal of the pyro processing equipment and relevant devices from the viewpoint of remote operation and maintenance. In our research is presented activities and progress made in developing remote handling systems to be used for the remote operation and maintenance of the pyro processing equipment and relevant devices in the Pride. (Author)

  2. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  3. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  4. Development of nuclear fuel cycle remote handling technology

    International Nuclear Information System (INIS)

    Kim, K. H.; Park, B. S.; Kim, S. H.

    2012-04-01

    This report presents the development of remote handling systems and remote equipment for use in the pyprocessing verification at the PRIDE (PyRoprocess Integrated inactive Demonstration facility). There are four areas conducted in this work. In first area, the prototypes of an engineering-scale high-throughput decladding voloxidizer which is capable of separating spent fuel rod-cuts into hulls and powder and collecting them separately, and an automatic equipment which is capable of collecting residual powder remaining on separated hulls were developed. In second area, a servo-manipulator system was developed to operate and maintain pyroprocess equipment located at the argon cell of the PRIDE in a remote manner. A servo-manipulator with dual arm that is mounted on the lower part of a bridge transporter will be installed on the ceiling of the in-cell and can travel the length of the ceiling. In third area, a digital mock-up and a remote handling evaluation mock-up were constructed to evaluate the pyroprocess equipments from the in-cell arrangements, remote operability and maintainability viewpoint before they are installed in the PRIDE. In last area, a base technology for remote automation of integrated pyroprocess was developed. The developed decladding voloxidizer and automatic equipment will be utilized in the development of a head-end process for pyroprocessing. In addition, the developed servo-manipulator will be used for remote operation and maintenance of the pyroprocess equipments in the PRIDE. The constructed digital mock-up and remote handling evaluation mock-up will be also used to verify and improve the pyroprocess equipments for the PRIDE application. Moreover, these remote technologies described above can be directly used in the PRIDE and applied for the KAPF (Korea Advanced Pyroprocess Facility) development

  5. Development of remote handling techniques for the HLLW solidification plant

    International Nuclear Information System (INIS)

    Tosha, Yoshitsugu; Iwata, Toshio; Inada, Eiichi; Nagaki, Hiroshi; Yamamoto, Masao

    1982-01-01

    To develop the techniques for the remote maintenance of the equipment in a HLLW (high-level liquid waste) solidification plant, the mock-up test facility (MTF) has been designed and constructed. Before its construction, the specific mock-up equipment was manufactured and tested. The results of the test and the outline of the MTF are described. As the mock-up equipment, a denitrater-concentrator, a ceramic melter and a canister handling equipment were selected. Remote operation was performed according to the maintenance program, and the evaluation of the component was conducted on the easiness of operation, performance, and the suitability to remote handling equipment. As a result of the test, four important elements were identified; they were guides, lifting fixtures, remote handling bolts, and remote pipe connectors. Many improvements of these elements were achieved, and reflected in the design of the MTF. The MTF is a steel-framed and slate-covered building (25 mL x 20 mW x 27 mH) with five storys of test bases. It contains the following four main systems: pretreatment and off-gas treatment system, glass melting system, canister handling system and secondary waste liquid recovery system. Further development of the remote maintenance techniques is expected through the test in the MTF. (Aoki, K.)

  6. The JET experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: Tool-weight compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Test of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5 mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250 m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17 m high with a 10 m horizontal arm, is being manufactured. It will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. Image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum. (orig.)

  7. The Jet experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: tool-weight compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Tests of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17m high with a 10m horizontal arm, is being manufactured. It will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. Image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum

  8. The JET experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: tool-weigth compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Tests of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5 mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250 m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17 m high with a 10 m horizontal arm, is being manufactured. it will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum. (author). 14 refs.; 12 figs

  9. ITER L 6 equatorial maintenance duct remote handling study

    International Nuclear Information System (INIS)

    Millard, J.

    1996-09-01

    The status and conclusions of a preliminary study of equatorial maintenance duct remote handling is reported. Due to issues with the original duct design a significant portion of the study had to be refocused on equatorial duct layout studies. The study gives an overview of some of the options for design of these ducts and the impact of the design on the equipment to work in the duct. To develop a remote handling concept for creating access through the ducts the following design tasks should be performed: define the operations sequences for equatorial maintenance duct opening and closing; review the remote handling requirements for equatorial maintenance duct opening and closing; design concept for door and pipe handling equipment and to propose preliminary procedures for material handling outsides the duct. 35 figs

  10. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  11. Beginnings of remote handling at the RAL Spallation Neutron Source

    International Nuclear Information System (INIS)

    Liska, D.J.; Hirst, J.

    1985-01-01

    Expenditure of funds and resources for remote maintenance systems traditionally are delayed until late in an accelerator's development. However, simple remote-surveillance equipment can be included early in facility planning to set the stage for future remote-handling needs and to identify appropriate personnel. Some basic equipment developed in the UK at the Spallation Neutron Source (SNS) that serves this function and that has been used to monitor beam loss during commissioning is described. A photograph of this equipment, positioned over the extractor septum magnet, is shown. This method can serve as a pattern approach to the problem of initiating remote-handling activities in other facilities

  12. Measurement and control system for the ITER remote handling mock-up test

    International Nuclear Information System (INIS)

    Oka, K.; Kakudate, S.; Takiguchi, Y.; Ako, K.; Taguchi, K.; Tada, E.; Ozaki, F.; Shibanuma, K.

    1998-01-01

    The mock-up test platforms composed of full-scale remote handling (RH) equipment were developed for demonstrating remote replacement of the ITER blanket and divertor. In parallel, the measurement and control system for operating these RH equipment were constructed on the basis of open architecture with object oriented feature, aiming at realization of fully-remoted automatic operation required for ITER. This paper describes the design concept of the measurement and control system for the remote handling equipment of ITER, and outlines the measured performances of the fabricated measurement system for the remote handling mock-up tests, which includes Data Acquisition System (DAS), Visual Monitoring System (VMS) and Virtual Reality System (VRS). (authors)

  13. Remote handling for an ISIS target change

    International Nuclear Information System (INIS)

    Broome, T.A.; Holding, M.

    1989-01-01

    During 1987 two ISIS targets were changed. This document describes the main features of the remote handling aspects of the work. All the work has to be carried out using remote handling techniques. The radiation level measured on the surface of the reflector when the second target had been removed was about 800 mGy/h demonstrating that hands on operations on any part of the target reflector moderator assembly is not practical. The target changes were the first large scale operations in the Target Station Remote Handling Cell and a great deal was learned about both equipment and working practices. Some general principles emerged which are applicable to other active handling tasks on facilities like ISIS and these are discussed below. 8 figs

  14. Man-machine cooperation in remote handling for fusion plants

    International Nuclear Information System (INIS)

    Leinemann, K.

    1984-01-01

    Man-machine cooperation in remote handling for fusion plants comprises cooperation for design of equipment and planning of procedures using a CAD system, and cooperation during operation of the equipment with computer aided telemanipulation systems (CAT). This concept is presently being implemented for support of slave positioning, camera tracking, and camera alignment in the KfK manipulator test facility. The pilot implementation will be used to test various man-machine interface layouts, and to establish a set of basic buildings blocks for future implementations of advanced remote handling control systems. (author)

  15. Conceptual design report for a remotely operated cask handling system. Revision 1

    International Nuclear Information System (INIS)

    Yount, J.A.; Berger, J.D.

    1984-09-01

    Recent advances in remote handling utilizing commercial robotics are conceptually applied to lowering operator cumulative radiation exposure and increasing throughput during cask handling operations in nuclear shipping and receiving facilities. Revision 1 incorporates functional criteria for facility equipment, equipment technical outline specifications, and interface control drawings to assist Architect Engineers in the application of remote handling to waste shipping and receiving facilities. The document has also been updated to show some of the equipment used in proof-of-principle testing during fiscal year 1984. 10 references, 50 figures, 1 table

  16. ITER - TVPS remote handling critical design issues

    International Nuclear Information System (INIS)

    1990-09-01

    This report describes critical design issues concerning remote maintenance of the ITER Torus Vacuum Pumping System (TVPS). The key issues under investigation are the regeneration/isolation valve seal and seal mechanism replacement; impact of inert gas operation; impact of remote handling (RH) on the building configuration and RH equipment requirements. Seal exchange concepts are developed and their impact on the valve design identified. Concerns regarding the design and operation of RH equipment in an inert gas atmosphere are also explored. The report compares preliminary RH equipment options, pumping equipment maintenance frequency and their impact on the building design, and makes recommendations where a conflict exists between pumping equipment and the building layout. (51 figs., 11 refs.)

  17. Computer imaging of EBR-II handling equipment

    International Nuclear Information System (INIS)

    Hansen, L.H.; Peters, G.G.

    1994-10-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. The system described in this paper uses actual signals to move a three-dimensional graphics model in real-time in response to movements of equipment in the plant. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. This paper will present details on how the 3D model was created and how real-time dynamic behavior was added to each of the moving components

  18. Application of advanced remote systems technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been advancing the technology of remote handling and remote maintenance for in-cell systems planned for future nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor is directly applicable to the proposed in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The application of teleoperated, force-reflecting servomanipulators with television viewing could be a major step forward in waste handling facility design. Primary emphasis in the current program is the operation of a prototype remote handling and maintenance system, the advanced servomanipulator (ASM), which specifically addresses the requirements of fuel reprocessing and waste handling with emphasis on force reflection, remote maintainability, reliability, radiation tolerance, and corrosion resistance. Concurrent with the evolution of dexterous manipulators, concepts have also been developed that provide guidance for standardization of the design of the remotely operated and maintained equipment, the interface between the maintenance tools and the equipment, and the interface between the in-cell components and the facility

  19. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  20. Remote handling needs of the Princeton Plasma Physics Laboratory

    International Nuclear Information System (INIS)

    Smiltnieks, V.

    1982-07-01

    This report is the result of a Task Force study commissioned by the Canadian Fusion Fuels Technology Project (CFFTP) to investigate the remote handling requirements at the Princeton Plasma Physics Laboratory (PPPL) and identify specific areas where CFFTP could offer a contractual or collaborative participation, drawing on the Canadian industrial expertise in remote handling technology. The Task Force reviewed four areas related to remote handling requirements; the TFTR facility as a whole, the service equipment required for remote maintenance, the more complex in-vessel components, and the tritium systems. Remote maintenance requirements both inside the vacuum vessel and around the periphery of the machine were identified as the principal areas where Canadian resources could effectively provide an input, initially in requirement definition, concept evaluation and feasibility design, and subsequently in detailed design and manufacture. Support requirements were identified in such areas as the mock-up facility and a variety of planning studies relating to reliability, availability, and staff training. Specific tasks are described which provide an important data base to the facility's remote handling requirements. Canadian involvement in the areas is suggested where expertise exists and support for the remote handling work is warranted. Reliability, maintenance operations, inspection strategy and decommissioning are suggested for study. Several specific components are singled out as needing development

  1. Potential applications of advanced remote handling and maintenance technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future US nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two Federal Waste Management System major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment

  2. Potential applications of advanced remote handling and maintenance technology to future waste handling facilities

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future U.S. nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two Federal Waste Management System major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment

  3. Computer imaging of EBR-II fuel handling equipment

    International Nuclear Information System (INIS)

    Peters, G.G.; Hansen, L.H.

    1995-01-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. The system described in this paper uses actual signals to drive a three-dimensional computer-generated model in real-time in response to movements of equipment in the plant This paper will present details on how the 3D model of the intank equipment was created and how real-time dynamic behavior was added to each of the moving components

  4. Remote handling in reprocessing plants

    International Nuclear Information System (INIS)

    Streiff, G.

    1984-01-01

    Remote control will be the rule for maintenance in hot cells of future spent fuel reprocessing plants because of the radioactivity level. New handling equipments will be developed and intervention principles defined. Existing materials, recommendations for use and new manipulators are found in the PMDS' documentation. It is also a help in the choice and use of intervention means and a guide for the user [fr

  5. Robotics and remote handling in the nuclear industry

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    This book presents the papers given at a conference on the use of remote handling equipment in nuclear facilities. Topics considered at the conference included dose reduction, artificial intelligence in nuclear plant maintenance, robotic welding, uncertainty covariances, reactor operation and inspection, reactor maintenance and repair, uranium mining, fuel fabrication, reactor component manufacture, irradiated fuel and radioactive waste management, and radioisotope handling.

  6. SP-100 reactor disassembly remote handling test program

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Maiden, G.E.; Vader, D.P.

    1991-01-01

    This paper is presented as an overview of the remote handling equipment validation testing, which will be conducted before installation and use in the ground engineering test facility. This equipment will be used to defuel the SP-100 reactor core after removing it from the Test Assembly following nuclear testing. A series of full scale mock-up operational tests will be conducted at a Hanford Site facility to verify equipment design, operation, and capabilities

  7. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  8. Progress in the design of the ITER Neutral Beam cell Remote Handling System

    Energy Technology Data Exchange (ETDEWEB)

    Shuff, R., E-mail: robin.shuff@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Van Uffelen, M.; Damiani, C. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Tesini, A.; Choi, C.-H. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France); Meek, R. [Oxford Technologies Limited, 7 Nuffield Way, Abingdon OX14 1RL (United Kingdom)

    2014-10-15

    The ITER Neutral Beam cell will include a suite of Remote Handling equipment for maintenance tasks. This paper summarises the current status and recent developments in the design of the ITER Neutral Beam Remote Handling System. Its concept design was successfully completed in July 2012 by CCFE in the frame of a grant agreement with F4E, in collaboration with the ITER Organisation, including major systems like monorail crane, Beam Line Transporter, beam source equipment, upper port and neutron shield equipment and associated tooling. Research and development activities are now underway on the monorail crane radiation hardened on-board control system and first of a kind remote pipe and lip seal maintenance tooling for the beam line vessel, reported in this paper.

  9. Progress in the design of the ITER Neutral Beam cell Remote Handling System

    International Nuclear Information System (INIS)

    Shuff, R.; Van Uffelen, M.; Damiani, C.; Tesini, A.; Choi, C.-H.; Meek, R.

    2014-01-01

    The ITER Neutral Beam cell will include a suite of Remote Handling equipment for maintenance tasks. This paper summarises the current status and recent developments in the design of the ITER Neutral Beam Remote Handling System. Its concept design was successfully completed in July 2012 by CCFE in the frame of a grant agreement with F4E, in collaboration with the ITER Organisation, including major systems like monorail crane, Beam Line Transporter, beam source equipment, upper port and neutron shield equipment and associated tooling. Research and development activities are now underway on the monorail crane radiation hardened on-board control system and first of a kind remote pipe and lip seal maintenance tooling for the beam line vessel, reported in this paper

  10. Potential application of nuclear remote-handling technology to underwater inspection and maintenance

    International Nuclear Information System (INIS)

    Eccleston, M.J.

    1990-01-01

    Examples are given of remote handling equipment developed within the nuclear industry and employing telemanipulative or telerobotic principles. In telerobotics the nuclear industry has been following a trend towards increased levels of autonomy, delegating operator control to a computer, for example, in resolved rate manipulator tip control, teach-and-repeat control and collision avoidance. Illustrations are presented of remote-handling techniques from the nuclear industry which may be carried over into undersea remote inspection, maintenance and repair systems. (author)

  11. Remote handling equipment for laboratory research of fuel reprocessing in Nuclear Research Institute at Rez

    International Nuclear Information System (INIS)

    Fidler, J.; Novy, P.; Kyrs, M.

    1985-04-01

    Laboratory installations were developed for two nuclear fuel reprocessing methods, viz., the solvent extraction process and the fluoride volatility process. The apparatus for solvent extraction reprocessing consists of a pneumatically driven rod-chopper, a dissolver, mixer-settler extractors, an automatic fire extinguishing device and other components and it was tested using irradiated uranium. The technological line for the fluoride volatility process consists of a fluorimater, condensers, sorption columns with NaF pellets and a distillation column for the separation of volatile fluorides from UF 6 . The line has not yet been tested using irradiated fuel. Some features of the remote handling equipment of both installations are briefly described. (author)

  12. Development of nuclear fuel microsphere handling techniques and equipment

    International Nuclear Information System (INIS)

    Mack, J.E.; Suchomel, R.R.; Angelini, P.

    1979-01-01

    Considerable progress has been made in the development of microsphere handling techniques and equipment for nuclear applications. Work at Oak Ridge National Laboratory with microspherical fuel forms dates back to the early sixties with the development of the sol-gel process. Since that time a number of equipment items and systems specifically related to microsphere handling and characterization have been identified and developed for eventual application in a remote recycle facility. These include positive and negative pressure transfer systems, samplers, weighers, a blender-dispenser, and automated devices for particle size distribution and crushing strength analysis. The current status of these and other components and systems is discussed

  13. Remote handling recognition and display device

    International Nuclear Information System (INIS)

    Kimura, Motohiko.

    1979-01-01

    Purpose: To surely recognize the movements of remote handling equipments in a reactor by the use of a device in a simple structure. Constitution: A light emission surface and a light reception surface are provided, for example, putting therebetween a hook of a nob of a control rod as a remote control equipment. Depending on the position of the hook, there are two possible cases where the light can not arrive the light reception surface inhibited by the hook and where the light can be received not inhibited by the hook. By visually monitoring the presence or absence of the light reception from the outside of the reactor, the movement of the nob for the control rod can be recognized. Optical fibers connect the optical source with the light emission surface, and the light reception surface with the display surface. (Ikeda, J.)

  14. Preoperational checkout of the remote-handled transuranic waste handling at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1987-09-01

    This plan describes the preoperational checkout for handling Remote-Handled Transuranic (RH-TRU) Wastes from their receipt at the Waste Isolation Pilot Plant (WIPP) to their emplacement underground. This plan identifies the handling operations to be performed, personnel groups responsible for executing these operations, and required equipment items. In addition, this plan describes the quality assurance that will be exercised throughout the checkout, and finally, it establishes criteria by which to measure the success of the checkout. 7 refs., 5 figs

  15. Development of nuclear fuel cycle remote handling technology

    International Nuclear Information System (INIS)

    Kim, K. H.; Park, B. S.; Kim, S. H.

    2010-04-01

    This report presents the development of remote handling systems and remote equipment for use in the pyprocessing verification at the PRIDE (PyRoprocess Integrated inactive Demonstration facility). There are three areas conducted in this work. In first area, developed were the prototypes of an engineering-scale high-throughput decladding voloxidizer which is capable of separating spent fuel rod-cuts into hulls and powder and collecting them separately and an automatic equipment which is capable of collecting residual powder remaining on separated hulls. In second area, a servo-manipulator prototype was developed to operate and maintain pyroprocess equipment located at the argon cell of the PRIDE in a remote manner. A servo-manipulator with dual arm that is mounted on the lower part of a bridge transporter will be installed on the ceiling of the in-cell and can travel the length of the ceiling. In last area, a simulator was developed to simulate and evaluate the design developments of the pyroprocess equipment from the in-cell arrangements, remote operability and maintainability viewpoint in a virtual process environment in advance before they are constructed. The developed decladding voloxidizer and automatic equipment will be utilized in the development of a head-end process for pyroprocessing. In addition, the developed servo-manipulator will be installed in the PRIDE and used for remote operation and maintenance of the pyroprocess equipment. The developed simulator will be also used to verify and improve the design of the pyroprocess equipment for the PRIDE application. Moreover, these remote technologies described above can be directly used in the PRIDE and applied for the ESPF (Engineering Scale Pyroprocess Facility) and KAPF (Korea Advanced Pyroprocess Facility) development

  16. Design guides for radioactive-material-handling facilities and equipment

    International Nuclear Information System (INIS)

    Doman, D.R.; Barker, R.E.

    1980-01-01

    Fourteen key areas relating to facilities and equipment for handling radioactive materials involved in examination, reprocessing, fusion fuel handling and remote maintenance have been defined and writing groups established to prepare design guides for each areas. The guides will give guidance applicable to design, construction, operation, maintenance and safety, together with examples and checklists. Each guide will be reviewed by an independent review group. The guides are expected to be compiled and published as a single document

  17. Advanced robotic remote handling system for reactor dismantlement

    International Nuclear Information System (INIS)

    Shinohara, Yoshikuni; Usui, Hozumi; Fujii, Yoshio

    1991-01-01

    An advanced robotic remote handling system equipped with a multi-functional amphibious manipulator has been developed and used to dismantle a portion of radioactive reactor internals of an experimental boiling water reactor in the program of reactor decommissioning technology development carried out by the Japan Atomic Energy Research Institute. (author)

  18. Remote handling at LAMPF

    International Nuclear Information System (INIS)

    Grisham, D.L.; Lambert, J.E.

    1983-01-01

    Experimental area A at the Clinton P. Anderson Meson Physics Facility (LAMPF) encompasses a large area. Presently there are four experimental target cells along the main proton beam line that have become highly radioactive, thus dictating that all maintenance be performed remotely. The Monitor remote handling system was developed to perform in situ maintenance at any location within area A. Due to the complexity of experimental systems and confined space, conventional remote handling methods based upon hot cell and/or hot bay concepts are not workable. Contrary to conventional remote handling which require special tooling for each specifically planned operation, the Monitor concept is aimed at providing a totally flexible system capable of remotely performing general mechanical and electrical maintenance operations using standard tools. The Monitor system is described

  19. The use of virtual reality for preparation and implementation of JET remote handling operations

    International Nuclear Information System (INIS)

    Sanders, S.; Rolfe, A.C.

    2003-01-01

    The use of real time 3-D computer graphic models for preparation and support of remote handling operations on JET has been in use since the mid 1980s. A complete review has been undertaken of the functional requirements and benefits of VR for remote handling and a subsequent market survey of the present state-of-the-art of VR systems has resulted in the implementation of a new system for JET. The VR system is used in two discrete modes: in on-line mode the remote handling equipment Electro-mechanical hardware is connected to the VR system and provides input for the VR system to update a real time 3-D display of the equipment inside the torus. This mode supplements the video camera system and assists with camera control and warnings of impending or potential collisions. In Off-line mode the operator manipulates the VR system model with no connections to the remote handling equipment. This mode is used during preparation of RH operational strategies, checking of operational feasibility and operations procedures. Various VR systems were evaluated against a detailed technical specification that covered visualisation function and performance, user interface design and base model input/creation capabilities. The cheapest of those systems that satisfied the technical requirements was selected

  20. Eye-in-Hand Manipulation for Remote Handling: Experimental Setup

    Science.gov (United States)

    Niu, Longchuan; Suominen, Olli; Aref, Mohammad M.; Mattila, Jouni; Ruiz, Emilio; Esque, Salvador

    2018-03-01

    A prototype for eye-in-hand manipulation in the context of remote handling in the International Thermonuclear Experimental Reactor (ITER)1 is presented in this paper. The setup consists of an industrial robot manipulator with a modified open control architecture and equipped with a pair of stereoscopic cameras, a force/torque sensor, and pneumatic tools. It is controlled through a haptic device in a mock-up environment. The industrial robot controller has been replaced by a single industrial PC running Xenomai that has a real-time connection to both the robot controller and another Linux PC running as the controller for the haptic device. The new remote handling control environment enables further development of advanced control schemes for autonomous and semi-autonomous manipulation tasks. This setup benefits from a stereovision system for accurate tracking of the target objects with irregular shapes. The overall environmental setup successfully demonstrates the required robustness and precision that remote handling tasks need.

  1. Development of spent fuel remote handling technology

    International Nuclear Information System (INIS)

    Yoon, J. S.; Hong, H. D.; Kim, S. H.

    2004-02-01

    In this research, the remote handling technology is developed for the advanced spent fuel conditioning process which gives a possible solution to deal with the rapidly increasing spent fuels. In detail, a fuel rod slitting device is developed for the decladding of the spent fuel. A series of experiments has been performed to find out the optimal condition of the spent fuel voloxidation which converts the UO 2 pellet into U 3 O 8 powder. The design requirements of the ACP equipment for hot test is established by analysing the modular requirement, radiation hardening and thermal protection of the process equipment, etc. The prototype of the servo manipulator is developed. The manipulator has an excellent performance in terms of the payload to weight ratio that is 30 % higher than that of existing manipulators. To provide reliability and safety of the ACP, the 3 dimensional graphic simulator is developed. Using the simulator the remote handling operation is simulated and as a result, the optimal layout of ACP is obtained. The supervisory control system is designed to control and monitor the several different unit processes. Also the failure monitoring system is developed to detect the possible accidents of the reduction reactor

  2. Canadian capabilities in fusion fuels technology and remote handling

    International Nuclear Information System (INIS)

    1987-10-01

    This report describes Canadian expertise in fusion fuels technology and remote handling. The Canadian Fusion Fuels Technology Project (CFFTP) was established and is funded by the Canadian government, the province of Ontario and Ontario Hydro to focus on the technology necessary to produce and manage the tritium and deuterium fuels to be used in fusion power reactors. Its activities are divided amongst three responsibility areas, namely, the development of blanket, first wall, reactor exhaust and fuel processing systems, the development of safe and reliable operating procedures for fusion facilities, and, finally, the application of these developments to specific projects such as tritium laboratories. CFFTP also hopes to utilize and adapt Canadian developments in an international sense, by, for instance, offering training courses to the international tritium community. Tritium management expertise is widely available in Canada because tritium is a byproduct of the routine operation of CANDU reactors. Expertise in remote handling is another byproduct of research and development of of CANDU facilities. In addition to describing the remote handling technology developed in Canada, this report contains a brief description of the Canadian tritium laboratories, storage beds and extraction plants as well as a discussion of tritium monitors and equipment developed in support of the CANDU reactor and fusion programs. Appendix A lists Canadian manufacturers of tritium equipment and Appendix B describes some of the projects performed by CFFTP for offshore clients

  3. Applying remote handling attributes to the ITER neutral beam cell monorail crane

    Energy Technology Data Exchange (ETDEWEB)

    Crofts, O., E-mail: Oliver.Crofts@CCFE.ac.uk [CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Allan, P.; Raimbach, J. [CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Tesini, A.; Choi, C.-H. [ITER Organisation, CS90 046, 13067 St. Paul les Durance Cedex (France); Damiani, C.; Van Uffelen, M. [Fusion for Energy, C/Josep Pla 2, Torres Diagonal Litoral-B3, E-08019 Barcelona (Spain)

    2013-10-15

    The maintenance requirements for the equipment in the ITER neutral beam cell require components to be lifted and transported within the cell by remote means. To meet this requirement, the provision of an overhead crane with remote handling capabilities has been initiated. The layout of the cell has driven the design to consist of a monorail crane that travels on a branched monorail track attached to the cell ceiling. This paper describes the principle design constraints and how the remote handling attributes were applied to the concept design of the monorail crane, concentrating on areas where novel design solutions have been required and on the remote recovery requirements and solutions.

  4. Applying remote handling attributes to the ITER neutral beam cell monorail crane

    International Nuclear Information System (INIS)

    Crofts, O.; Allan, P.; Raimbach, J.; Tesini, A.; Choi, C.-H.; Damiani, C.; Van Uffelen, M.

    2013-01-01

    The maintenance requirements for the equipment in the ITER neutral beam cell require components to be lifted and transported within the cell by remote means. To meet this requirement, the provision of an overhead crane with remote handling capabilities has been initiated. The layout of the cell has driven the design to consist of a monorail crane that travels on a branched monorail track attached to the cell ceiling. This paper describes the principle design constraints and how the remote handling attributes were applied to the concept design of the monorail crane, concentrating on areas where novel design solutions have been required and on the remote recovery requirements and solutions

  5. Remote handling equipment design for the HEDL fuel supply program

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1984-09-01

    A process line is currently being developed for fabrication of high exposure mixed uranium-plutonium core assemblies. This paper describes the design philosophy, process flow, equipment, and the handling and radiation shielding techniques used for inspection of Fast Flux Test Facility (FFTF) fuel pins and assembly of Driver Fuel Assemblies (DFAs) 6 figures

  6. Design of special purpose equipment - remote control dozer

    International Nuclear Information System (INIS)

    Aprameyan, K.

    1990-01-01

    Operation environment in handling hot slag, radio active material, clearing/dismantling buildings and loose rocky zones pose hazards with the operation of heavy duty vehicles. Under such hazardous environment conditions, elimination of operator becomes the prime criteria. Remote control of heavy vehicles is resorted to operate the equipment in various working conditions. Radio control systems coupled with penumatic/hydraulic actuators and proportional control logics aim total control of the equipment from a distance using hand pendants. Bharat Earth Moovers Limited has successfully developed remote control system for dozers of 200hp and 300hp. (author). 3 figs

  7. Irradiation tests of critical components for remote handling in gamma radiation environment

    International Nuclear Information System (INIS)

    Obara, Henjiro; Kakudate, Satoshi; Oka, Kiyoshi

    1994-08-01

    Since the fusion power core of a D-T fusion reactor will be highly activated once it starts operation, personnel access will be prohibited so that assembly and maintenance of the components in the reactor core will have to be totally conducted by remote handling technology. Fusion experimental reactors such as ITER require unprecedented remote handling equipments which are tolerable under gamma radiation of more than 10 6 R/h. For this purpose, the Japan Atomic Energy Research Institute (JAERI) has been developing radiation hard components for remote handling purpose and a number of key components have been tested over 10 9 rad at a radiation dose rate of around 10 6 R/h, using Gamma Ray Radiation Test Facility in JAERI-Takasaki Establishment. This report summarizes the irradiation test results and the latest status of AC servo motor, potentiometer, optical elements, lubricant, sensors and cables, which are key elements of the remote handling system. (author)

  8. Guidelines for Remote Handling Maintenance of ITER Neutral Beam Components

    International Nuclear Information System (INIS)

    Cordier, J.-J.; Hemsworth, R.; Bayetti, P.

    2006-01-01

    Remote handling maintenance of ITER components is one of the main challenges of the ITER project. This type of maintenance shall be operational for the nuclear phase of exploitation of ITER, and be considered at a very early stage since it significantly impacts on the components design, interfaces management and integration business. A large part of the R/H equipment will be procured by the EU partner, in particular the whole Neutral Beam Remote Handling (RH) equipment package. A great deal of work has already been done in this field during the EDA phase of ITER project, but improvements and alternative option that are now proposed by ITER lead to added RH and maintenance engineering studies. The Neutral Beam Heating -and- Current Drive system 1 is being revisited by the ITER project. The vertical maintenance scheme that is presently considered by ITER, may significantly impact on the reference design of the Neutral Beam (NB) system and associated components and lead to new design of the NB box itself. In addition, revision of both NB cell radiation level zoning and remote handling classification of the beam line injector will also significantly impact on components design and maintenance. Based on the experience gained on the vertical maintenance scheme, developed in detail for the ITER Neutral Beam Test Facility 2 to be built in Europe in a near future, guidelines for the revision of the design and preliminary feasibility study of the remote handling vertical maintenance scheme of beam line components are described in the paper. A maintenance option for the SINGAP3 accelerator is also presented. (author)

  9. Conceptual design report for a remotely operated cask handling system

    International Nuclear Information System (INIS)

    Yount, J.A.; Berger, J.D.

    Recent advances in remote handling utilizing commercial robotics are conceptually applied to the problem of lowering operator cumulative dose and increasing throughput during cask handling operations in proposed nuclear waste container shipping and receiving facilities. The functional criteria for each subsystem are defined, and candidate systems are described. The report also contains a generic description of a waste receiving facility, to show possible deployment configurations for the equipment

  10. Concept design of DEMO divertor cassette remote handling: Simply supported beam approach

    Energy Technology Data Exchange (ETDEWEB)

    Mozzillo, Rocco [CREATE, University of Naples Federico II, DII, P.le Tecchio 80, 80125, Naples (Italy); Di Gironimo, Giuseppei, E-mail: peppe.digironimo@gmail.com [CREATE, University of Naples Federico II, DII, P.le Tecchio 80, 80125, Naples (Italy); Mäkinen, Harri [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland); Miccichè, Gioacchino [ENEA – CR Brasimone, I-40032 Camugnano, BO (Italy); Määttä, Timo [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland)

    2017-03-15

    Highlights: • The present work focused on a new approach to the design of DEMO Divertor Cassette Remote Handling Equipment. • The work provides an alternative approach to the design based on the concept of a simply supported beam. • The approach proposed focuses a Divertor Cassette mover that performs the maintenance of the three cassettes at each port. • First rough dimensioning of the main components has been provided and demonstrating the feasibility of the design solutions. • The main idea of the work consisted on a design capable to use knowledge already adopted in industrial contexts. - Abstract: The present work focused on the development of a new approach to the concept design of DEMO Divertor Cassette (DC) Remote Handling Equipment (RHE). The approach is based on three main assumptions: the DC remote handling activities and the equipment shall be simplified as much as possible; technologies well known and consolidated in the industrial context can be adopted also in the nuclear fusion field; the design of the RHE should be based on a simply supported beam approach instead of cantilever approach. In detail, during the maintenance activities the barycentre of the DC is centred with respect to DC supports. This solution could simplify the design of RHE with a consequent reduction of the design and development costs. Moreover also the DC remote handling tasks shall be simplified in order to better manage the DC maintenance processes. For this reason the DC assembly and disassembly process has been simplified dividing the main sequences in basic movements. For each movement a dedicated tool has been conceived.

  11. ITER - torus vacuum pumping system remote handling issues

    International Nuclear Information System (INIS)

    Stringer, J.

    1992-11-01

    This report describes further design issues concerning remote maintenance of torus vacuum pumping systems options for ITER. The key issues under investigation in this report are flask support systems for valve seal exchange operations for the compound cryopump scheme and remote maintenance of a proposed multiple turbomolecular pump (TMP) system, an alternative ITER torus exhaust pumping option. Previous studies have shown that the overhead support methods for seal exchange flask equipment could malfunction due to valve/flask misalignment. A floor-mounted support system is described in this report. This scheme provides a more rigid support system for seal exchange operations. An alternative torus pumping system, based on the use of multiple TMPs, is studied from a remote maintenance standpoint. In this concept, centre distance spacing for pump/valve assemblies is too restrictive for remote maintenance. Recommendations are made for adequate spacing of these assemblies based on commercially-available 0.8 m and 1.0 m diameter valves. Fewer pumps will fit in this arrangement, which implies a need for larger TMPs. Pumps of this size are not commercially available. Other concerns regarding the servicing and storage of remote handling equipment in cells are also identified. (9 figs.)

  12. Development of remote handling technology for nuclear fuel cycle facilities in Japan

    International Nuclear Information System (INIS)

    Maekawa, Hiromichi; Sakai, Akira; Miura, Noriaki; Kozaka, Tetsuo; Hamada, Takashi

    2015-01-01

    Remote handling technology has been systematically developed for nuclear fuel cycle facilities in Japan since 1970s, primarily in parallel with the development of reprocessing and HLLW (High Level Liquid Waste) vitrification process. In case of reprocessing and vitrification process to handle highly radioactive and hazardous materials, the most of components are installed in the radiation shielded hot cells and operators are not allowed to enter the work area in the cells for operation and maintenance. Therefore, a completely remote handling system is adopted for the cells to reduce radiation doses of operators and increase the availability of the facility. The hot cells are generally designed considering the scale of components (laboratory, demonstration, or full-scale), the function of the systems (chemical process, material handling, dismantling, decontamination, or chemical analysis), and the environmental conditions (radiation dose rate, airborne concentration, surface contamination, or fume/mist/dust). Throughout our domestic development work for remote handling technology, the concept of the large scale integrated cell has been adopted rather than a number of small scale separated cells, for the reasons to reduce the total installation space and the number of remote handling equipment required for the each cell as much as possible. In our domestic remote maintenance design, several new concepts have been developed, tested, and demonstrated in the Tokai Virtrification Facility (TVF) and the Rokkasho HLLW Vitrification and Storage Facility (K-facility). Layout in the hot cells, the performance of remote handling equipment, and the structure of the in-cell components are important factors for remote maintenance design. In case of TVF (hot tests started in 1995), piping and vessels are prefabricated in the rack modules and installed in two lines on both sides of the cell. These modules are designed to be remotely replaced in the whole rack. Two overhead cranes

  13. Proposed master-slave and automated remote handling system for high-temperature gas-cooled reactor fuel refabrication

    International Nuclear Information System (INIS)

    Grundmann, J.G.

    1974-01-01

    The Oak Ridge National Laboratory's Thorium-Uranium Recycle Facility (TURF) will be used to develop High-Temperature Gas-Cooled Reactor (HTGR) fuel recycle technology which can be applied to future HTGR commercial fuel recycling plants. To achieve recycle capabilities it is necessary to develop an effective material handling system to remotely transport equipment and materials and to perform maintenance tasks within a hot cell facility. The TURF facility includes hot cells which contain remote material handling equipment. To extend the capabilities of this equipment, the development of a master-slave manipulator and a 3D-TV system is necessary. Additional work entails the development of computer controls to provide: automatic execution of tasks, automatic traverse of material handling equipment, automatic 3D-TV camera sighting, and computer monitoring of in-cell equipment positions to prevent accidental collisions. A prototype system which will be used in the development of the above capabilities is presented. (U.S.)

  14. Remote-handled transuranic system assessment appendices. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives.

  15. Remote-handled transuranic system assessment appendices. Volume 2

    International Nuclear Information System (INIS)

    1995-11-01

    Volume 2 of this report contains six appendices to the report: Inventory and generation of remote-handled transuranic waste; Remote-handled transuranic waste site storage; Characterization of remote-handled transuranic waste; RH-TRU waste treatment alternatives system analysis; Packaging and transportation study; and Remote-handled transuranic waste disposal alternatives

  16. Design for high productivity remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Sykes, N., E-mail: nick.sykes@ccfe.ac.uk [Culham Centre For Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Collins, S.; Loving, A.B.; Ricardo, V. [Culham Centre For Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Villedieu, E. [Association Euratom-CEA Cadarache, DSM/IRFM, Saint Paul Les Durance (France)

    2011-10-15

    As the central part of a programme of enhancements in support of ITER, the Joint European Torus (JET) is being equipped with an all-metal wall. This enhancement programme requires the removal and installation of 6927 tile carriers and tiles, as well as the removal and installation of embedded diagnostics and antennas. The scale of this operation and the necessity to maximise operational availability of the facility added a requirement for high productivity in the remote activities to the existing exigencies of precision, reliability, cleanliness and operational security. This high productivity requirement has been incorporated into the design of the components and associated installation tooling, the design of the installation equipment, the development of installation procedures including the use of a mock-up for optimisation and training. Consideration of the remote handling installation process is vital during the design of the in vessel components. A number of features to meet the need of the high productivity while maintaining the function requirements have been incorporated into the metal wall components and associated tooling including kinematic design with guidance appropriate for remote operation. The component and tools are designed to guide the attachment of the installation tool, the installation path, and the interlocking with adjacent components without contact between the fragile castellated beryllium of the adjacent tiles. Other incorporated ergonomic features are discussed. At JET, the remote maintenance is conducted using end effectors, normally bi-lateral force feed back manipulator, mounted on driven, articulated booms. Prior to the current shutdown one long boom was used to conduct the installation and collect and deliver components to the 'short' boom which was linked to the tile carrier transfer facility. This led to loss of efficiency during these movements. The adoption of a new remote handling philosophy using 'point of

  17. Design for high productivity remote handling

    International Nuclear Information System (INIS)

    Sykes, N.; Collins, S.; Loving, A.B.; Ricardo, V.; Villedieu, E.

    2011-01-01

    As the central part of a programme of enhancements in support of ITER, the Joint European Torus (JET) is being equipped with an all-metal wall. This enhancement programme requires the removal and installation of 6927 tile carriers and tiles, as well as the removal and installation of embedded diagnostics and antennas. The scale of this operation and the necessity to maximise operational availability of the facility added a requirement for high productivity in the remote activities to the existing exigencies of precision, reliability, cleanliness and operational security. This high productivity requirement has been incorporated into the design of the components and associated installation tooling, the design of the installation equipment, the development of installation procedures including the use of a mock-up for optimisation and training. Consideration of the remote handling installation process is vital during the design of the in vessel components. A number of features to meet the need of the high productivity while maintaining the function requirements have been incorporated into the metal wall components and associated tooling including kinematic design with guidance appropriate for remote operation. The component and tools are designed to guide the attachment of the installation tool, the installation path, and the interlocking with adjacent components without contact between the fragile castellated beryllium of the adjacent tiles. Other incorporated ergonomic features are discussed. At JET, the remote maintenance is conducted using end effectors, normally bi-lateral force feed back manipulator, mounted on driven, articulated booms. Prior to the current shutdown one long boom was used to conduct the installation and collect and deliver components to the 'short' boom which was linked to the tile carrier transfer facility. This led to loss of efficiency during these movements. The adoption of a new remote handling philosophy using 'point of installation

  18. Virtual reality applications in remote handling development for tokamaks in India

    International Nuclear Information System (INIS)

    Dutta, Pramit; Rastogi, Naveen; Gotewal, Krishan Kumar

    2017-01-01

    Highlights: • Evaluation of Virtual Reality (VR) in design and operation phases of Remote Handling (RH) equipment for tokamak. • VR based centralized facility, to cater RH development and operation, is setup at Institute for Plasma Research, India. • The VR facility system architecture and components are discussed. • Introduction to various VR applications developed for design and development of tokamak RH equipment. - Abstract: A tokamak is a plasma confinement device that can be used to achieve magnetically confined nuclear fusion within a reactor. Owing to the harsh environment, Remote Handling (RH) systems are used for inspection and maintenance of the tokamak in-vessel components. As the number of in-vessel components requiring RH maintenance is large, physical prototyping of all strategies becomes a major challenge. The operation of RH systems poses further challenge as all equipment have to be controlled remotely within very strict accuracy limits with minimum reliance on the available camera feedback. In both design and operation phases of RH equipment, application of Virtual Reality (VR) becomes imperative. The scope of this paper is to introduce some applications of VR in the design and operation cycle of RH, which are not available commercially. The paper discusses the requirement of VR as a tool for RH equipment design and operation. The details of a comprehensive VR facility that has been established to support the RH development for Indian tokamaks are also presented. Further, various cases studies are provided to highlight the utilization of this VR facility within phases of RH development and operation.

  19. Virtual reality applications in remote handling development for tokamaks in India

    Energy Technology Data Exchange (ETDEWEB)

    Dutta, Pramit, E-mail: pramitd@ipr.res.in; Rastogi, Naveen; Gotewal, Krishan Kumar

    2017-05-15

    Highlights: • Evaluation of Virtual Reality (VR) in design and operation phases of Remote Handling (RH) equipment for tokamak. • VR based centralized facility, to cater RH development and operation, is setup at Institute for Plasma Research, India. • The VR facility system architecture and components are discussed. • Introduction to various VR applications developed for design and development of tokamak RH equipment. - Abstract: A tokamak is a plasma confinement device that can be used to achieve magnetically confined nuclear fusion within a reactor. Owing to the harsh environment, Remote Handling (RH) systems are used for inspection and maintenance of the tokamak in-vessel components. As the number of in-vessel components requiring RH maintenance is large, physical prototyping of all strategies becomes a major challenge. The operation of RH systems poses further challenge as all equipment have to be controlled remotely within very strict accuracy limits with minimum reliance on the available camera feedback. In both design and operation phases of RH equipment, application of Virtual Reality (VR) becomes imperative. The scope of this paper is to introduce some applications of VR in the design and operation cycle of RH, which are not available commercially. The paper discusses the requirement of VR as a tool for RH equipment design and operation. The details of a comprehensive VR facility that has been established to support the RH development for Indian tokamaks are also presented. Further, various cases studies are provided to highlight the utilization of this VR facility within phases of RH development and operation.

  20. Handling of multiassembly sealed baskets between reactor storage and a remote handling facility

    International Nuclear Information System (INIS)

    Massey, J.V.; Kessler, J.H.; McSherry, A.J.

    1989-06-01

    The storage of multiple fuel assemblies in sealed (welded) dry storage baskets is gaining increasing use to augment at-reactor fuel storage capacity. Since this increasing use will place a significant number of such baskets on reactor sites, some initial downstream planning for their future handling scenarios for retrieving multi-assembly sealed baskets (MSBs) from onsite storage and transferring and shipping the fuel (and/or the baskets) to a federally operated remote handling facility (RHF). Numerous options or at-reactor and away-from-reactor handling were investigated. Materials handling flowsheets were developed along with conceptual designs for the equipment and tools required to handle and open the MSBs. The handling options were evaluated and compared to a reference case, fuel handling sequence (i.e., fuel assemblies are taken from the fuel pool, shipped to a receiving and handling facility and placed into interim storage). The main parameters analyzed are throughout, radiation dose burden and cost. In addition to evaluating the handling of MSBs, this work also evaluated handling consolidated fuel canisters (CFCs). In summary, the handling of MSBs and CFCs in the store, ship and bury fuel cycle was found to be feasible and, under some conditions, to offer significant benefits in terms of throughput, cost and safety. 14 refs., 20 figs., 24 tabs

  1. Design and operation of a remotely operated plutonium waste size reduction and material handling process

    International Nuclear Information System (INIS)

    Stewart, J.A. III; Charlesworth, D.L.

    1986-01-01

    Noncombustible 238 Pu and 239 Pu waste is generated as a result of normal operation and decommissioning activity at the Savannah River Plant, and is being retrievably stored there. As part of the long-term plant to process the stored waste and current waste for permanent disposal, a remote size reduction and material handling process is being cold-tested at Savannah River Laboratory. The process consists of a large, low-speed shredder and material handling system, a remote worktable, a bagless transfer system, and a robotically controlled manipulator. Initial testing of the shredder and material handling system and a cycle test of the bagless transfer system has been completed. Fabrication and acceptance testing of the Telerobat, a robotically controlled manipulator has been completed. Testing is scheduled to begin in 3/86. Design features maximizing the ability to remotely maintain the equipment were incorporated. Complete cold-testing of the equipment is scheduled to be completed in 1987

  2. Operating experience with remote handling equipment in a typical hot facility

    International Nuclear Information System (INIS)

    Ravishankar, A.; Balasubramanian, G.R.

    1990-01-01

    Large number of articulated arm manipulators and special purpose remote tools have been used either alone or in combination in a recent campaign of treatment of irradiated J rods of CIRUS for separation of 233 U. These equipments were used for operations such as remote maintenance of centrifuge, centrifugal extractor, direct sampling, assistance for sample conveying operations etc. Paper discusses problems encountered in using articulated arm manipulators of type MAll,AMl and how they were overcome. Problems encountered in use of model-8 manipulator for chopper maintenence in a mockup facility are also highlighted. (author). 4 figs., 1 tab

  3. ITER - torus vacuum pumping system remote handling issues

    International Nuclear Information System (INIS)

    Stringer, J.

    1992-11-01

    This report describes design issues concerning remote maintenance of the ITER torus vacuum pumping system. Key issues under investigation in this report are bearings for inert gas operation, transporter integration options, cryopump access, gate valve maintenance frequency, tritium effects on materials, turbomolecular pump design, and remote maintenance. Alternative bearing materials are explored for inert gas operation. Encapsulated motors and rotary feedthroughs offer an alternative option where space requirements are restrictive. A number of transporter options are studied. The preferred scheme depends on the shielded reconfigured ducts to prevent streaming and activation of RH (remote handling) equipment. A radiation mapping of the cell is required to evaluate this concept. Valve seal and bellow life are critical issues and need to be evaluated, as they have a direct bearing on the provision of adequate RH equipment to meet scheduled and unscheduled maintenance outages. The limited space on the inboard side of the cryopumps for RH equipment access requires a reconfigured duct and manifold. A modified shielded duct arrangement is proposed, which would provide more access space, reduced activation of components, and the potential for improved valve seal life. Work at Mound Laboratories has shown the adverse effects of tritium on some bearing lubricants. Silicone-based lubricants should be avoided. (11 refs., 2 tabs., 31 figs.)

  4. Interim design status and operational report for remote handling fixtures: primary and secondary burners

    International Nuclear Information System (INIS)

    Burgoyne, R.M.

    1976-12-01

    The HTGR reprocessing flowsheet consists of two basic process elements: (1) spent fuel crushing and burning and (2) solvent extraction. Fundamental to these elements is the design and development of specialized process equipment and support facilities. A major consideration of this design and development program is equipment maintenance: specifically, the design and demonstration of selected remote maintenance capabilities and the integration of these into process equipment design. This report documents the current status of the development of remote handling and maintenance fixtures for the primary and secondary burners

  5. Radiation-tolerant cable management systems for remote handling applications in the nuclear industry

    International Nuclear Information System (INIS)

    Cullen, S.; Thom, M.

    1993-01-01

    Experience has shown that one of the most vulnerable areas within remote handling equipment is the umbilical cable and termination system. Repairs of a damaged system can be very long due to poorly designed termination techniques. Over the past five years W.L. Gore has gained considerable experience in the design and manufacture of cable systems, utilising unique radiation tolerant materials and manufacturing processes. The cable systems manufactured at the W.L. Gore, Dunfermline, Scotland facility have proven to give excellent performance in the most demanding of remote handling applications. (author)

  6. Remote handling assessment of attachment concepts for DEMO blanket segments

    Energy Technology Data Exchange (ETDEWEB)

    Iglesias, Daniel, E-mail: daniel.iglesias@ccfe.ac.uk [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Bastow, Roger; Cooper, Dave; Crowe, Robert; Middleton-Gear, Dave [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Sibois, Romain [VTT, Technical Research Centre of Finland, Industrial Systems, ROViR, Tampere (Finland); Carloni, Dario [Institute of Neutron Physics and Reactor Technology, Karlsruhe Institute of Technology (KIT) (Germany); Vizvary, Zsolt; Crofts, Oliver [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Harman, Jon [EFDA Close Support Unit Garching, Boltzmannstaße 2, D-85748 Garching bei München (Germany); Loving, Antony [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom)

    2015-10-15

    Highlights: • Challenges are identified for the remote handling of blanket segments’ attachments. • Two attachment design approaches are assessed for remote handling (RH) feasibility. • An alternative is proposed, which potentially simplifies and speeds-up RH operations. • Up to three different assemblies are proposed for the remote handling of the attachments. • Proposed integrated design of upper port is compatible with the attachment systems. - Abstract: The replacement strategy of the massive Multi-Module Blanket Segments (MMS) is a key driver in the design of several DEMO systems. These include the blankets themselves, the vacuum vessel (VV) and its ports and the Remote Maintenance System (RMS). Common challenges to any blanket attachment system have been identified, such as the need for applying a preload to the MMS manifold, the effects of the decay heat and several uncertainties related to permanent deformations when removing the blanket segments after service. The WP12 kinematics of the MMS in-vessel transportation was adapted to the requirements of each of the supports during 2013 and 2014 design activities. The RM equipment envisaged for handling attachments and earth connections may be composed of up to three different assemblies. An In-Vessel Mover at the divertor level handles the lower support and earth bonding, and could stabilize the MMS during transportation. A Shield Plug crane with a 6 DoF manipulator operates the upper attachment and earth straps. And a Vertical Maintenance Crane is responsible for the in-vessel MMS transportation and can handle the removable upper support pins. A final proposal is presented which can potentially reduce the number of required systems, at the same time that speeds-up the RMS global operations.

  7. Development of a Remote Handling System in an Integrated Pyroprocessing Facility

    Directory of Open Access Journals (Sweden)

    Hyo Jik Lee

    2013-10-01

    Full Text Available Over the course of a decade-long research programme, the Korea Atomic Energy Research Institute (KAERI has developed several remote handling systems for use in pyroprocessing research facilities. These systems are now used successfully for the operation and maintenance of processing equipment. The most recent remote handling system is the bridge-transported dual arm servo-manipulator system (BDSM, which is used for remote operation at the world's largest pyroprocess integrated inactive demonstration facility (PRIDE. Accurate and reliable servo-control is the basic requirement for the BDSM to accomplish any given tasks successfully in a hotcell environment. To achieve this end, the hardware and software of a digital signal processor-based remote control system were fully custom-developed and implemented to control the BDSM. To reduce the residual vibration of the BDSM, several input profiles, including input shaping, were carefully chosen and evaluated. Furthermore, a time delay controller was employed to achieve good tracking performance and systematic gain tuning. The experimental results demonstrate that the applied control algorithms are more effective than conventional approaches. The BDSM successfully completed its performance tests at a mock-up and was installed at PRIDE for real-world operation. The remote handling system at KAERI is expected to advance the actualization of pyroprocessing.

  8. Radioactivity, shielding, radiation damage, and remote handling

    International Nuclear Information System (INIS)

    Wilson, M.T.

    1975-01-01

    Proton beams of a few hundred million electron volts of energy are capable of inducing hundreds of curies of activity per microampere of beam intensity into the materials they intercept. This adds a new dimension to the parameters that must be considered when designing and operating a high-intensity accelerator facility. Large investments must be made in shielding. The shielding itself may become activated and require special considerations as to its composition, location, and method of handling. Equipment must be designed to withstand large radiation dosages. Items such as vacuum seals, water tubing, and electrical insulation must be fabricated from radiation-resistant materials. Methods of maintaining and replacing equipment are required that limit the radiation dosages to workers.The high-intensity facilities of LAMPF, SIN, and TRIUMF and the high-energy facility of FERMILAB have each evolved a philosophy of radiation handling that matches their particular machine and physical plant layouts. Special tooling, commercial manipulator systems, remote viewing, and other techniques of the hot cell and fission reactor realms are finding application within accelerator facilities. (U.S.)

  9. Development of spent fuel remote handling technology

    Energy Technology Data Exchange (ETDEWEB)

    Park, B. S.; Yoon, J. S.; Hong, H. D. (and others)

    2007-02-15

    In this research, the remote handling technology was developed for the ACP application. The ACP gives a possible solution to reduce the rapidly cumulative amount of spent fuels generated from the nuclear power plants in Korea. The remote technologies developed in this work are a slitting device, a voloxidizer, a modified telescopic servo manipulator and a digital mock-up. A slitting device was developed to declad the spent fuel rod-cuts and collect the spent fuel UO{sub 2} pellets. A voloxidizer was developed to convert the spent fuel UO{sub 2} pellets obtained from the slitting process in to U{sub 3}O{sub 8} powder. Experiments were performed to test the capabilities and remote operation of the developed slitting device and voloxidizer by using simulated rod-cuts and fuel in the ACP hot cell. A telescopic servo manipulator was redesigned and manufactured improving the structure of the prototype. This servo manipulator was installed in the ACP hot cell, and the target module for maintenance of the process equipment was selected. The optimal procedures for remote operation were made through the maintenance tests by using the servo manipulator. The ACP digital mockup in a virtual environment was established to secure a reliability and safety of remote operation and maintenance. The simulation for the remote operation and maintenance was implemented and the operability was analyzed. A digital mockup about the preliminary conceptual design of an enginnering-scale ACP was established, and an analysis about a scale of facility and remote handling was accomplished. The real-time diagnostic technique was developed to detect the possible fault accidents of the slitting device. An assessment of radiation effect for various sensors was also conducted in the radiation environment.

  10. Welding method by remote handling

    International Nuclear Information System (INIS)

    Hashinokuchi, Minoru.

    1994-01-01

    Water is charged into a pit (or a water reservoir) and an article to be welded is placed on a support in the pit by remote handling. A steel plate is disposed so as to cover the article to be welded by remote handling. The welding device is positioned to the portion to be welded and fixed in a state where the article to be welded is shielded from radiation by water and the steel plate. Water in the pit is drained till the portion to be welded is exposed to the atmosphere. Then, welding is conducted. After completion of the welding, water is charged again to the pit and the welding device and fixing jigs are decomposed in a state where the article to be welded is shielded again from radiation by water and the steel plate. Subsequently, the steel plate is removed by remote handling. Then, the article to be welded is returned from the pit to a temporary placing pool by remote handling. This can reduce operator's exposure. Further, since the amount of the shielding materials can be minimized, the amount of radioactive wastes can be decreased. (I.N.)

  11. Conceptual design of a test facility for the remote handling operations of the ITER Test Blanker Modules

    International Nuclear Information System (INIS)

    Marqueta, A.; Garcia, I.; Gomez, A.; Garcia, L.; Sedano, E.; Fernandez, I.

    2012-01-01

    Conceptual Design of a test facility for the remote handling operations of the ITER Test Blanket Modules. Conditions inside a fusion reactor are incompatible with conventional manual maintenance tasks. the same applies for ancillary equipment. As a consequence, it will become necessary to turn to remote visualization and remote handling techniques, which will have in consideration the extreme conditions, both physical and operating, of ITER. Main goal of the project has been the realization of the conceptual design for the test facility for the Test Blanket Modules of ITER and their associated systems, related to the Remote Handling operations regarding the Port Cell area. Besides the definition of the operations and the specification of the main components and ancillary systems of the TBM graphical simulation have been used for the design, verification and validation of the remote handling operations. (Author)

  12. Design and operation of equipment used to develop remote coating capability for HTGR fuel particles

    International Nuclear Information System (INIS)

    Suchomel, R.R.; Stinton, D.P.; Preston, M.K.; Heck, J.L.; Bolfing, B.J.; Lackey, W.J.

    1978-12-01

    Refabrication of HTGR fuels is a manufacturing process that consists of preparation of fuel kernels, application of multiple layers of pyrolytic carbon and silicon carbide, preparation of fuel rods, and assembly of fuel rods into fuel elements. All the equipment for refabrication of 233 U-containing fuel must be designed for completely remote operation and maintenance in hot-cell facilities. Equipment to remotely coated HTGR fuel particles has been designed and operated. Although not all of the equipment development needed for a fully remote coating system has been completed, significant progress has been made. The most important component of the coating furnace is the gas distributor, which must be simple, reliable, and easily maintainable. Techniques for loading and unloading the coater and handling microspheres have been developed. An engineering-scale system, currently in operation, is being used to verify the workability of these concepts. Coating crucible handling components are used to remove the crucible from the furnace, remove coated particles, and exchange the crucible, if necessary. After the batch of particles has been unloaded, it is transferred, weighed, and sampled. The components used in these processes have been tested to ensure that no particle breakage or holdup occurs. Tests of the particle handling system have been very encouraging because no major problems have been encountered. Instrumentation that controls the equipment performed very smoothly and reliably and can be operated remotely

  13. Remote technology related to the handling, storage and disposal of spent fuel. Proceedings of a technical committee meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    Reduced radiation exposure, greater reliability and cost savings are all potential benefits of the application of remote technologies to the handling of spent nuclear fuel. Remote equipment and technologies are used to some extent in all facilities handling fuel and high-level wastes whether they are for interim storage, processing/repacking, reprocessing or disposal. In view of the use and benefits of remote technologies, as well as recent technical and economic developments in the area, the IAEA organized the Technical Committee Meeting (TCM) on Remote Technology Related to the Handling, Storage and/or Disposal of Spent Fuel. Twenty-one papers were presented at the TCM, divided into five general areas: 1. Choice of technologies; 2. Use of remote technologies in fuel handling; 3. Use of remote technologies for fuel inspection and characterization; 4. Remote maintenance of facilities; and 5. Current and future developments. Refs, figs and tabs.

  14. Remote removal of contaminated equipment from a radiochemical engineering cell

    International Nuclear Information System (INIS)

    Scharnhorst, N.L.; Bryan, G.H.; Bjorklund, W.J.

    1984-01-01

    Large-scale vitrification equipment in a radioactive cell was dismantled and packed for burial through the use of viewing windows with manipulators, two overhead cranes, and unique tools for disassembling, grabbing, and handling the equipment components. An air-driven reciprocating hacksaw, remotely placed and operated, was used to cut large structural members inaccessible by the manipulators. Remotely operated circular saws and a plasma torch were used to cut calciners, furnaces, storage vessels, piping, pumps, and structural members into pieces that were placed safely into shielded burial boxes. This engineering effort was accomplished without any exposure problems in approximately 17 months, which required almost 10 equivalent worker-years. 8 figures, 1 table

  15. Localization of cask and plug remote handling system in ITER using multiple video cameras

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, João, E-mail: jftferreira@ipfn.ist.utl.pt [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Vale, Alberto [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ribeiro, Isabel [Laboratório de Robótica e Sistemas em Engenharia e Ciência - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2013-10-15

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building.

  16. Localization of cask and plug remote handling system in ITER using multiple video cameras

    International Nuclear Information System (INIS)

    Ferreira, João; Vale, Alberto; Ribeiro, Isabel

    2013-01-01

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building

  17. Techniques for remote maintenance of in-cell material-handling system in the HFEF/N main cell

    International Nuclear Information System (INIS)

    Tobias, D.A.; Frickey, C.A.

    1975-01-01

    Operations in the main cell of HFEF/N have required development of remote handling equipment and unique techniques for maintaining the in-cell material-handling system. Specially designed equipment is used to remove a disabled crane or electromechanical manipulator bridge from its support rails and place it on floor stands for repair or maintenance. Support areas for the main cell, such as the spray chamber and hot repair area, provide essential decontamination, repair, and staging areas for the in-cell material-handling-system equipment and tools. A combined engineering and technical effort in upgrading existing master-slave manipulators has definitely reduced the requirements for their maintenance. The cell is primarily for postirradiation examination of LMFBR materials and fuel elements

  18. Full scale tests on remote handled FFTF fuel assembly waste handling and packaging

    International Nuclear Information System (INIS)

    Allen, C.R.; Cash, R.J.; Dawson, S.A.; Strode, J.N.

    1986-01-01

    Handling and packaging of remote handled, high activity solid waste fuel assembly hardware components from spent FFTF reactor fuel assemblies have been evaluated using full scale components. The demonstration was performed using FFTF fuel assembly components and simulated components which were handled remotely using electromechanical manipulators, shielding walls, master slave manipulators, specially designed grapples, and remote TV viewing. The testing and evaluation included handling, packaging for current and conceptual shipping containers, and the effects of volume reduction on packing efficiency and shielding requirements. Effects of waste segregation into transuranic (TRU) and non-transuranic fractions also are discussed

  19. Development of monitoring-control methods for heavy remote handling operations in an irradiated environment

    Energy Technology Data Exchange (ETDEWEB)

    Argouac' h, J R [Alsthom-Atlantique, ACB Nantes (France)

    1984-11-01

    Heavy remote handling equipment units have benefited from the progress made in robotics, but with certain specific constraints linked to the environment in which they are required to operate. Notably, these constraints impose the exclusive use of electrical techniques.

  20. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  1. PREPD O and VE remote handling system

    International Nuclear Information System (INIS)

    Theil, T.N.

    1985-01-01

    The Process Experimental Pilot Plant (PREPP) at the Idaho National Engineering Laboratory is designed for volume reduction and packaging of transuranic (TRU) waste. The PREPP opening and verification enclosure (O and VE) remote handling system, within that facility, is designed to provide examination of the contents of various TRU waste storage containers. This remote handling system will provide the means of performing a hazardous operation that is currently performed manually. The TeleRobot to be used in this system is a concept that will incorporate and develop man in the loop operation (manual mode), standardized automatic sequencing of end effector tools, increased payload and reach over currently available computer-controlled robots, and remote handling of a hazardous waste operation. The system is designed within limited space constraints and an operation that was originally planned, and is currently being manually performed at other plants. The PREPP O and VE remote handling system design incorporates advancing technology to improve the working environment in the nuclear field

  2. Remote handling technology for nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Sakai, Akira; Maekawa, Hiromichi; Ohmura, Yutaka

    1997-01-01

    Design and R and D on nuclear fuel cycle facilities has intended development of remote handling and maintenance technology since 1977. IHI has completed the design and construction of several facilities with remote handling systems for Power Reactor and Nuclear Fuel Development Corporation (PNC), Japan Atomic Energy Research Institute (JAERI), and Japan Nuclear Fuel Ltd. (JNFL). Based on the above experiences, IHI is now undertaking integration of specific technology and remote handling technology for application to new fields such as fusion reactor facilities, decommissioning of nuclear reactors, accelerator testing facilities, and robot simulator-aided remote operation systems in the future. (author)

  3. TMI-2 [Three Mile Island Nuclear Power Station] fuel canister and core sample handling equipment used in INEL hot cells

    International Nuclear Information System (INIS)

    McConnell, J.W. Jr.; Shurtliff, W.T.; Lynch, R.J.; Croft, K.M.; Whitmill, L.J.; Allen, S.M.

    1987-01-01

    This paper describes the specialized remote handling equipment developed and used at the Idaho National Engineering Laboratory (INEL) to handle samples obtained from the core of the damaged Unit 2 reactor at Three Mile Island Nuclear Power Station (TM-2). Samples of the core were removed, placed in TMI-2 fuel canisters, and transported to the INEL. Those samples will be examined as part of the analysis of the TMI-2 accident. The equipment described herein was designed for removing sample materials from the fuel canisters, assisting with initial examination, and processing samples in preparation for detailed examinations. The more complex equipment used microprocessor remote controls with electric motor drives providing the required force and motion capabilities. The remaining components were unpowered and manipulator assisted

  4. Applying HAZOP analysis in assessing remote handling compatibility of ITER port plugs

    International Nuclear Information System (INIS)

    Duisings, L.P.M.; Til, S. van; Magielsen, A.J.; Ronden, D.M.S.; Elzendoorn, B.S.Q.; Heemskerk, C.J.M.

    2013-01-01

    Highlights: ► We applied HAZOP analysis to assess the criticality of remote handling maintenance activities on port plugs in the ITER Hot Cell facility. ► We identified several weak points in the general upper port plug maintenance concept. ► We made clear recommendations on redesign in port plug design, operational sequence and Hot Cell equipment. ► The use of a HAZOP approach for the ECH UL port can also be applied to ITER port plugs in general. -- Abstract: This paper describes the application of a Hazard and Operability Analysis (HAZOP) methodology in assessing the criticality of remote handling maintenance activities on port plugs in the ITER Hot Cell facility. As part of the ECHUL consortium, the remote handling team at the DIFFER Institute is developing maintenance tools and procedures for critical components of the ECH Upper launcher (UL). Based on NRG's experience with nuclear risk analysis and Hot Cell procedures, early versions of these tool concepts and maintenance procedures were subjected to a HAZOP analysis. The analysis identified several weak points in the general upper port plug maintenance concept and led to clear recommendations on redesigns in port plug design, the operational sequence and ITER Hot Cell equipment. The paper describes the HAZOP methodology and illustrates its application with specific procedures: the Steering Mirror Assembly (SMA) replacement and the exchange of the Mid Shield Optics (MSO) in the ECH UPL. A selection of recommended changes to the launcher design associated with the accessibility, maintainability and manageability of replaceable components are presented

  5. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2007-01-01

    ITER is a joint international research and development project that aims to demonstrate the scientific and technological feasibility of fusion power. As soon as the plasma operation begins using tritium, the replacement of the vacuum vessel internal components will need to be done with remote handling techniques. To accomplish these operations ITER has equipped itself with a Remote Maintenance System; this includes the Remote Handling equipment set and the Hot Cell facility. Both need to work in a cooperative way, with the aim of minimizing the machine shutdown periods and to maximize the machine availability. The ITER Remote Handling equipment set is required to be available, robust, reliable and retrievable. The machine components, to be remotely handle-able, are required to be designed simply so as to ease their maintenance. The baseline ITER Remote Handling equipment is described. The ITER Hot Cell Facility is required to provide a controlled and shielded area for the execution of repair operations (carried out using dedicated remote handling equipment) on those activated components which need to be returned to service, inside the vacuum vessel. The Hot Cell provides also the equipment and space for the processing and temporary storage of the operational and decommissioning radwaste. A conceptual ITER Hot Cell Facility is described. (orig.)

  6. Progress in standardization for ITER Remote Handling control system

    International Nuclear Information System (INIS)

    Hamilton, David Thomas; Tesini, Alessandro; Ranz, Roberto; Kozaka, Hiroshi

    2014-01-01

    Graphical abstract: - Highlights: • Standard parts specified for ITER Remote Handling (RH) control system. • Standard approach for VR modeling of structural deformations in real-time. • RH Core System produced as standard platform for RH controller applications. • Synthetic Viewing investigated and demonstrated. • Structured language defined for RH operation procedures and motion sequences. - Abstract: An integrated control system architecture has been defined for the ITER Remote Handling (RH) equipment systems, and work has been continuing to develop and validate standards for this architecture. Evaluations of standard parts and a standard control room work-cell have contributed to an update of the RH Control System Design Handbook, while R and D activities have been carried out to validate concepts for standard solutions to ITER RH problems: the use of a standard master arm with different slave arms, the achievement of high accuracy tracking of RH operations within virtual reality, and condition monitoring of RH equipment systems. The standardization efforts have been consolidated through the development of a freely distributable software platform to support the adoption of the ITER RH standards. The RH Core System installs on top of the CODAC Core System and provides the basic platform for the development of ITER RH equipment controller applications. The standardization work has continued in the areas of RH viewing, network communication protocols, and a structured language for programming ITER RH operations. Prototyping has been done on high-level control system applications, and R and D has been carried out in the area of synthetic viewing for ITER RH. These developments will be reflected in a new version of the RH Core System to be produced during 2013

  7. Progress in standardization for ITER Remote Handling control system

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, David Thomas, E-mail: david.hamilton@iter.org [ITER Organization, Route de Vinon, 13115 St. Paul-lez-Durance (France); Tesini, Alessandro [ITER Organization, Route de Vinon, 13115 St. Paul-lez-Durance (France); Ranz, Roberto [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Kozaka, Hiroshi [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan)

    2014-10-15

    Graphical abstract: - Highlights: • Standard parts specified for ITER Remote Handling (RH) control system. • Standard approach for VR modeling of structural deformations in real-time. • RH Core System produced as standard platform for RH controller applications. • Synthetic Viewing investigated and demonstrated. • Structured language defined for RH operation procedures and motion sequences. - Abstract: An integrated control system architecture has been defined for the ITER Remote Handling (RH) equipment systems, and work has been continuing to develop and validate standards for this architecture. Evaluations of standard parts and a standard control room work-cell have contributed to an update of the RH Control System Design Handbook, while R and D activities have been carried out to validate concepts for standard solutions to ITER RH problems: the use of a standard master arm with different slave arms, the achievement of high accuracy tracking of RH operations within virtual reality, and condition monitoring of RH equipment systems. The standardization efforts have been consolidated through the development of a freely distributable software platform to support the adoption of the ITER RH standards. The RH Core System installs on top of the CODAC Core System and provides the basic platform for the development of ITER RH equipment controller applications. The standardization work has continued in the areas of RH viewing, network communication protocols, and a structured language for programming ITER RH operations. Prototyping has been done on high-level control system applications, and R and D has been carried out in the area of synthetic viewing for ITER RH. These developments will be reflected in a new version of the RH Core System to be produced during 2013.

  8. Highly active vitrification plant remote handling operational experience and improvements

    International Nuclear Information System (INIS)

    Milgate, I.

    1996-01-01

    All the main process plant and equipment at the Sellafield Waste Vitrification Plant (WVP) is enclosed in heavily shielded concrete walled cells. There is a large quantity of relatively complex plant and equipment which must be remotely operated, maintained or replaced in-cell in a severe environment. The WVP has five in-cell polar cranes which are of modular construction to aid replacement of failed components. Each can be withdrawn into a shielded cell extension for decontamination and hands-on maintenance. The cells have a total of 80 through wall tube positions to receive Master Slave Manipulators (MSMs). The MSMs are used where possible for ''pick and place'' purposes but are often called upon to position substantial pieces of mechanical equipment and thus are subject to heavy loading and high failure rates. An inward flow of air is maintained in the active cells. The discharged air passes through a filter cell where remote damper operation filter changing and maintenance is carried out by means of a PAR3000 manipulator. A Nuclear Engineered Advanced Teleoperated Robot (Neater) swabs the vitrified product container to ensure cleanliness before storage. There is a significant arising of solid radioactive waste from replaced in-cell items which undergoes sorting and size reduction in a breakdown cell equipped with a large reciprocating saw and a hydraulic shear. Improvements to the remote handling facilities made in the light of operational experience are described. (UK)

  9. Remote handling machines

    International Nuclear Information System (INIS)

    Sato, Shinri

    1985-01-01

    In nuclear power facilities, the management of radioactive wastes is made with its technology plus the automatic techniques. Under the radiation field, the maintenance or aid of such systems is important. To cope with this situation, MF-2 system, MF-3 system and a manipulator system as remote handling machines are described. MF-2 system consists of an MF-2 carrier truck, a control unit and a command trailer. It is capable of handling heavy-weight objects. The system is not by hydraulic but by electrical means. MF-3 system consists of a four-crawler truck and a manipulator. The truck is versatile in its posture by means of the four independent crawlers. The manipulator system is bilateral in operation, so that the delicate handling is made possible. (Mori, K.)

  10. Development of standard components for remote handling

    International Nuclear Information System (INIS)

    Taguchi, Kou; Kakudate, Satoshi; Nakahira, Masataka; Ito, Akira

    1998-01-01

    The core of Fusion Experimental Reactor consists of various components such as superconducting magnets and forced-cooled in-vessel components, which are remotely maintained due to intense of gamma radiation. Mechanical connectors such as cooling pipe connections, insulation joints and electrical connectors are commonly used for maintenance of these components and have to be standardized in terms of remote handling. This paper describes these mechanical connectors developed as the standard component compatible with remote handling and tolerable for radiation. (author)

  11. Development of standard components for remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Taguchi, Kou; Kakudate, Satoshi; Nakahira, Masataka; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The core of Fusion Experimental Reactor consists of various components such as superconducting magnets and forced-cooled in-vessel components, which are remotely maintained due to intense of gamma radiation. Mechanical connectors such as cooling pipe connections, insulation joints and electrical connectors are commonly used for maintenance of these components and have to be standardized in terms of remote handling. This paper describes these mechanical connectors developed as the standard component compatible with remote handling and tolerable for radiation. (author)

  12. Remote handling and automation in back end of fuel cycle

    International Nuclear Information System (INIS)

    Nair, K.N.S.

    2010-01-01

    Full text: Indian nuclear programme is readying for a quantum leap and it is essential that technology is available for building advanced fuel recycle plants in the back end and for sustained operation of such plants. Remote technology and automation plays a big role to achieve this goal. With the introduction of advanced fuel cycles in indigenous programme and scenario of international cooperation it is essential to be ready with indigenous technology for meeting all challenges. Work has been progressing to develop locally support technology for remote handling and automation with good success. Essential RH tools such as master slave manipulators, power manipulators and hot cell viewing systems have been developed and commercial production has been established. Customised RH requirements for back end plants have been met and the designs have proven to be worthy for hot operations over the years. In the last few years stress has been on development of equipment and technology to meet the increasing demands of higher throughput plants. Substantial progress has been achieved in the head end and reconversion laboratory systems of reprocessing plants. Similarly successful efforts have also been made for establishing Thoria processing cells and also the RH in the reconversion operations. Custom designed equipment has been developed for decommissioning of ceramic melter, used glove boxes etc. Efforts are on hand to develop automated RH equipment for material handling in underground repositories. This paper aims at bringing out the theme based on some of our own experiences and some reports from plants in operation abroad. (author)

  13. REMOTE MATERIAL HANDLING IN THE YUCCA MOUNTAIN WASTE PACKAGE CLOSURE CELL AND SUPPORT AREA GLOVEBOX

    International Nuclear Information System (INIS)

    K.M. Croft; S.M. Allen; M.W. Borland

    2005-01-01

    The Yucca Mountain Waste Package Closure System (WPCS) cells provide for shielding of highly radioactive materials contained in unsealed waste packages. The purpose of the cells is to provide safe environments for package handling and sealing operations. Once sealed, the packages are placed in the Yucca Mountain Repository. Closure of a typical waste package involves a number of remote operations. Those involved typically include the placement of matched lids onto the waste package. The lids are then individually sealed to the waste package by welding. Currently, the waste package includes three lids. One lid is placed before movement of the waste package to the closure cell; the final two are placed inside the closure cell, where they are welded to the waste package. These and other important operations require considerable remote material handling within the cell environment. This paper discusses the remote material handling equipment, designs, functions, operations, and maintenance, relative to waste package closure

  14. High-definition television evaluation for remote handling task performance

    International Nuclear Information System (INIS)

    Fujita, Y.; Omori, E.; Hayashi, S.; Draper, J.V.; Herndon, J.N.

    1986-01-01

    In a plant that employs remote handling techniques for equipment maintenance, operators perform maintenance tasks primarily by using the information from television systems. The efficiency of the television system has a significant impact on remote maintenance task performance. High-definition television (HDTV) transmits a video image with more than twice the number of horizontal scan lines as standard-resolution television (1125 for HDTV to 525 for standard-resolution NTSC television). The added scan lines dramatically improve the resolution of images on the HDTV monitors. This paper describes experiments designed to evaluate the impact of HDTV on the performance of typical remote tasks. The experiments described in this paper compared the performance of four operators using HDTV with their performance while using other television systems. The experiments included four television systems: (a) high-definition color television, (b) high-definition monochromatic television, (c) standard-resolution monochromatic television, and (d) standard-resolution stereoscopic monochromatic television

  15. Regulatory process for material handling equipment

    International Nuclear Information System (INIS)

    Rajendran, S.; Agarwal, Kailash

    2017-01-01

    Atomic Energy (Factories) Rules (AEFR) 1996, Rule 35 states, 'Thorough inspection and load testing of a Crane shall be done by a Competent Person at least once every 12 months'. To adhere to this rule, BARC Safety Council constituted 'Material Handling Equipment Committee (MHEC)' under the aegis of Conventional Fire and Safety Review Committee (CFSRC) to carry out periodical inspection and certification of Material Handling Equipment (MHE), tools and tackles used in BARC Facilities at Trombay, Tarapur and Kalpakkam

  16. Handling and disposal of SP-100 ground test nuclear fuel and equipment

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Hodgson, R.D.

    1990-05-01

    The post SP-100 reactor testing period will focus on defueling the reactor, packaging the various radioactive waste forms, and shipping this material to the appropriate locations. Remote-handling techniques will be developed to defuel the reactor. Packaging the spent fuel and activated reactor components is a challenge in itself. This paper presents an overview of the strategy, methods, and equipment that will be used during the closeout phase of nuclear testing

  17. Handling and disposal of SP-100 ground test nuclear fuel and equipment

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Hodgson, R.D.

    1991-01-01

    The post SP-100 reactor testing period will focus on defueling the reactor, packaging the various radiactive waste forms, and shipping this material to the appropriate locations. Remote-handling techniques will be developed to defuel the reactor. Packaging the spent fuel and activated reactor components is a challenge in itself. This paper presents an overview of the strategy, methods, and equipment that will be used during the closeout phase of nuclear testing

  18. Conceptual design of CFETR divertor remote handling compatible structure

    International Nuclear Information System (INIS)

    Dai, Huaichu; Yao, Damao; Cao, Lei; Zhou, Zibo; Li, Lei

    2016-01-01

    Highlights: • Conceptual design for the CFETR divertor have been proposed, especially the divertor remote handling compatible structure. • The degrees of freedom of the divertor are analyzed in order to validate the design the divertor supports structure. • Besides the ITER-like scheme, a new scheme for the divertor remote handling compatible supports is proposed, that is the rack and pinion mechanism. • The installation/removel process is verified through simulation in Delmia in order to check design quality for remote handling requirements. - Abstract: Divertor is one of key components of tokamak fusion reactor. The CFETR is China Fusion Engineering Test Reactor. Its divertor will expose to tritium environment and neutron radiation. Materials of the divertor will be radioactived, and cannot be handled by personnel directly. To develop structure which compatible with robots handle for installation, maintenance and removing is required. This paper introduces a conceptual design of CFETR divertor module which compatible with remote handling end-effectors. The divertor module is confined by inner and outer support. The inner support is only confined divertor module radial, toroidal and vertical moving freedom degrees, but not confined rotating freedom degrees. The outer support is the structure that can confine rotating freedom degrees and should also be compatible with remote handling end-effectors.

  19. Conceptual design of CFETR divertor remote handling compatible structure

    Energy Technology Data Exchange (ETDEWEB)

    Dai, Huaichu, E-mail: yaodm@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); University of Science and Technology of China, Hefei (China); Yao, Damao; Cao, Lei; Zhou, Zibo; Li, Lei [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China)

    2016-11-15

    Highlights: • Conceptual design for the CFETR divertor have been proposed, especially the divertor remote handling compatible structure. • The degrees of freedom of the divertor are analyzed in order to validate the design the divertor supports structure. • Besides the ITER-like scheme, a new scheme for the divertor remote handling compatible supports is proposed, that is the rack and pinion mechanism. • The installation/removel process is verified through simulation in Delmia in order to check design quality for remote handling requirements. - Abstract: Divertor is one of key components of tokamak fusion reactor. The CFETR is China Fusion Engineering Test Reactor. Its divertor will expose to tritium environment and neutron radiation. Materials of the divertor will be radioactived, and cannot be handled by personnel directly. To develop structure which compatible with robots handle for installation, maintenance and removing is required. This paper introduces a conceptual design of CFETR divertor module which compatible with remote handling end-effectors. The divertor module is confined by inner and outer support. The inner support is only confined divertor module radial, toroidal and vertical moving freedom degrees, but not confined rotating freedom degrees. The outer support is the structure that can confine rotating freedom degrees and should also be compatible with remote handling end-effectors.

  20. Progress in the design, R and D and procurement preparation of the ITER Divertor Remote Handling System

    Energy Technology Data Exchange (ETDEWEB)

    Esqué, Salvador, E-mail: Salvador.Esque@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Hille, Carine van; Ranz, Roberto; Damiani, Carlo [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Palmer, Jim; Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France)

    2014-10-15

    Highlights: •The ITER Divertor Remote Handling System (DRHS) reference design is presented. •Different R and D activities that have contributed to the development and validation of the current reference design are reported. •The DRHS turns to be a unique system in terms of complexity due to size of the to-be-handled components, the novelty of the remote operations and the operational conditions. -- Abstract: The ITER Divertor Remote Handling System (DRHS) consists of a number of dedicated remote handling equipment and tooling that will provide the means to perform the exchange of the divertor system in a full-remote way. In order to achieve this objective the DRHS will need to perform a number of novel and complex remote operations in a contaminated and space-constrained environment, in rather poor lightening conditions. Fusion for Energy has recently launched the tendering phase for the in-kind procurement of the DRHS. The procurement is based on a set of system requirements and functional specifications supported by a reference design which are presented and discussed in this paper along with the main outcomes of the different R and D activities that have contributed to the development and validation of the current reference design.

  1. Advanced remote handling developments for high radiation applications

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Feldman, M.J.; Kuban, D.P.; Martin, H.L.; Rowe, J.C.; Hamel, W.R.

    1985-01-01

    The Remote Control Engineering Task of the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, and installation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  2. Mock-up test on key components of ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Matsumoto, Yasuhiro; Taguchi, Koh; Kozaka, Hiroshi; Shibanuma, Kiyoshi; Tesini, Alessandro

    2009-01-01

    The maintenance operation of the ITER in-vessel component, such as a blanket and divertor, must be executed by the remote equipment because of the high gamma-ray environment. During the Engineering Design Activity (EDA), the Japan Atomic Energy Agency (then called as Japan Atomic Energy Research Institute) had been fabricated the prototype of the vehicle manipulator system for the blanket remote handling and confirmed feasibility of this system including automatic positioning of the blanket and rail deployment procedure of the articulated rail. The ITER agreement, which entered into force in the last year, formally decided that Japan will procure the blanket remote handling system and the JAEA, as the Japanese Domestic Agency, is continuing several R and Ds so that the system can be procured smoothly. The residual key issues after the EDA are rail connection and cable handling. The mock-ups of the rail connection mechanism and the cable handling system were fabricated from the last year and installed at the JAEA Naka Site in this March. The former was composed of the rail connecting mechanism, two rail segments and their handling systems. The latter one utilized a slip ring, which implemented 80 lines for power and 208 lines for signal, because there is an electrical contact between the rotating spool and the fixed base. The basic function of these systems was confirmed through the mock-up test. The rail connection mechanism, for example, could accept misalignment of 1.5-2 mm at least. The future test plan is also mentioned in the paper.

  3. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  4. Remotely controlled inspection and handling systems for decommissioning tasks in nuclear facilities

    International Nuclear Information System (INIS)

    Schreck, G.; Bach, W.; Haferkamp, H.

    1993-01-01

    The Institut fur Werkstoffkunde at the University of Hanover has recently developed three remotely controlled systems for different underwater inspection and dismantling tasks. ODIN I is a tool guiding device, particularly being designed for the dismantling of the steam dryer housing of the KRB A power plant at Gundremmingen, Germany. After being approved by the licencing organization TUEV Bayern, hot operation started in November 1992. The seven axes remotely controlled handling system ZEUS, consisting of a three translatory axes guiding machine and a tool handling device with four rotatory axes, has been developed for the demonstration of underwater plasma arc cutting of spherical metallic components with great wall thicknesses. A specially designed twin sensor system and a modular torch, exchanged by means of a remote controlled tool changing device, will be used for different complex cutting tasks. FAUST, an autonomous, freediving underwater vehicle, was designed for complex inspection, maintenance and dismantling tasks. It is equipped with two video cameras, an ultrasonic and a radiologic sensor and a small plasma torch. A gripper and a subsidiary vehicle for inspection may be attached. (author)

  5. The application of advanced remote systems technology to future waste handling facilities: Waste Systems Data and Development Program

    International Nuclear Information System (INIS)

    Kring, C.T.; Herndon, J.N.; Meacham, S.A.

    1987-01-01

    The Consolidated Fuel Reprocessing Program (CFRP) at the Oak Ridge National Laboratory (ORNL) has been advancing the technology in remote handling and remote maintenance of in-cell systems planned for future US nuclear fuel reprocessing plants. Much of the experience and technology developed over the past decade in this endeavor are directly applicable to the in-cell systems being considered for the facilities of the Federal Waste Management System (FWMS). The ORNL developments are based on the application of teleoperated force-reflecting servomanipulators controlled by an operator completely removed from the hazardous environment. These developments address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in a waste handling facility. Employing technological advancements in dexterous manipulators, as well as basic design guidelines that have been developed for remotely maintained equipment and processes, can increase operation and maintenance system capabilities, thereby allowing the attainment of two FWMS major objectives: decreasing plant personnel radiation exposure and increasing plant availability by decreasing the mean-time-to-repair in-cell maintenance and process equipment. 5 refs., 7 figs

  6. New System For Tokamak T-10 Experimental Data Acquisition, Data Handling And Remote Access

    International Nuclear Information System (INIS)

    Sokolov, M. M.; Igonkina, G. B.; Koutcherenko, I. Yu.; Nurov, D. N.

    2008-01-01

    For carrying out the experiments on nuclear fusion devices in the Institute of Nuclear Fusion, Moscow, a system for experimental data acquisition, data handling and remote access (further 'DAS-T10') was developed and has been used in the Institute since the year 2000. The DAS-T10 maintains the whole cycle of experimental data handling: from configuration of data measuring equipment and acquisition of raw data from the fusion device (the Device), to presentation of math-processed data and support of the experiment data archive. The DAS-T10 provides facilities for the researchers to access the data both at early stages of an experiment and well afterwards, locally from within the experiment network and remotely over the Internet.The DAS-T10 is undergoing a modernization since the year 2007. The new version of the DAS-T10 will accommodate to modern data measuring equipment and will implement improved architectural solutions. The innovations will allow the DAS-T10 to produce and handle larger amounts of experimental data, thus providing the opportunities to intensify and extend the fusion researches. The new features of the DAS-T10 along with the existing design principles are reviewed in this paper

  7. Flexible path optimization for the Cask and Plug Remote Handling System in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Vale, Alberto, E-mail: avale@ipfn.ist.utl.pt [Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Fonte, Daniel; Valente, Filipe; Ferreira, João [Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ribeiro, Isabel [Laboratório de Robótica e Sistemas em Engenharia e Ciência, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Gonzalez, Carmen [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain)

    2013-10-15

    Highlights: ► Complementary approach for path optimization named free roaming that takes full advantage of the rhombic like kinematics of the Cask and Plug Remote Handling System (CPRHS). ► Possibility to find trajectories not possible in the past using the line guidance developed in a previous work, in particular when moving the Cask Transfer System (CTS) beneath the pallet or in rescue missions. ► Methodology that maximizes the common parts of different trajectories in the same level of ITER buildings. -- Abstract: The Cask and Plug Remote Handling System (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell Building and the Tokamak Building in ITER along pre-defined optimized trajectories. A first approach for CPRHS path optimization was previously proposed using line guidance as the navigation methodology to be adopted. This approach might not lead to feasible paths in new situations not considered during the previous work, as rescue operations. This paper addresses this problem by presenting a complementary approach for path optimization inspired in rigid body dynamics that takes full advantage of the rhombic like kinematics of the CPRHS. It also presents a methodology that maximizes the common parts of different trajectories in the same level of ITER buildings. The results gathered from 500 optimized trajectories are summarized. Conclusions and open issues are presented and discussed.

  8. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Science.gov (United States)

    2010-10-01

    ... equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT... Special Items 908.7112 Materials handling equipment replacement standards. Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405...

  9. Remote technologies for handling spent fuel

    International Nuclear Information System (INIS)

    Ramakumar, M.S.

    1999-01-01

    The nuclear programme in India involves building and operating power and research reactors, production and use of isotopes, fabrication of reactor fuel, reprocessing of irradiated fuel, recovery of plutonium and uranium-233, fabrication of fuel containing plutonium-239, uranium-233, post-irradiation examination of fuel and hardware and handling solid and liquid radioactive wastes. Fuel that could be termed 'spent' in thermal reactors is a source for second generation fuel (plutonium and uranium-233). Therefore, it is only logical to extend remote techniques beyond handling fuel from thermal reactors to fuel from fast reactors, post-irradiation examination etc. Fabrication of fuel containing plutonium and uranium-233 poses challenges in view of restriction on human exposure to radiation. Hence, automation will serve as a step towards remotisation. Automated systems, both rigid and flexible (using robots) need to be developed and implemented. Accounting of fissile material handled by robots in local area networks with appropriate access codes will be possible. While dealing with all these activities, it is essential to pay attention to maintenance and repair of the facilities. Remote techniques are essential here. There are a number of commonalities in these requirements and so development of modularized subsystems, and integration of different configurations should receive attention. On a long-term basis, activities like decontamination, decommissioning of facilities and handling of waste generated have to be addressed. While robotized remote systems have to be designed for existing facilities, future designs of facilities should take into account total operation with robotic remote systems. (author)

  10. Remote Inspection, Measurement and Handling for LHC

    CERN Document Server

    Kershaw, K; Coin, A; Delsaux, F; Feniet, T; Grenard, J L; Valbuena, R

    2007-01-01

    Personnel access to the LHC tunnel will be restricted to varying extents during the life of the machine due to radiation, cryogenic and pressure hazards. The ability to carry out visual inspection, measurement and handling activities remotely during periods when the LHC tunnel is potentially hazardous offers advantages in terms of safety, accelerator down time, and costs. The first applications identified were remote measurement of radiation levels at the start of shut-down, remote geometrical survey measurements in the collimation regions, and remote visual inspection during pressure testing and initial machine cool-down. In addition, for remote handling operations, it will be necessary to be able to transmit several real-time video images from the tunnel to the control room. The paper describes the design, development and use of a remotely controlled vehicle to demonstrate the feasibility of meeting the above requirements in the LHC tunnel. Design choices are explained along with operating experience to-dat...

  11. Experience of safety and performance improvement for fuel handling equipment

    International Nuclear Information System (INIS)

    Gyoon Chang, Sang; Hee Lee, Dae

    2014-01-01

    The purpose of this study is to provide experience of safety and performance improvement of fuel handling equipment for nuclear power plants in Korea. The fuel handling equipment, which is used as an important part of critical processes during the refueling outage, has been improved to enhance safety and to optimize fuel handling procedures. Results of data measured during the fuel reloading are incorporated into design changes. The safety and performance improvement for fuel handling equipment could be achieved by simply modifying the components and improving the interlock system. The experience provided in this study can be useful lessons for further improvement of the fuel handling equipment. (authors)

  12. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1998-01-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  13. Remote maintenance development for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Shibanuma, Kiyoshi

    1998-04-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  14. Project Execution Plan for the Remote Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Danny Anderson

    2014-07-01

    As part of ongoing cleanup activities at the Idaho National Laboratory (INL), closure of the Radioactive Waste Management Complex (RWMC) is proceeding under the Comprehensive Environmental Response, Compensation, and Liability Act (42 USC 9601 et seq. 1980). INL-generated radioactive waste has been disposed of at RWMC since 1952. The Subsurface Disposal Area (SDA) at RWMC accepted the bulk of INL’s contact and remote-handled low-level waste (LLW) for disposal. Disposal of contact-handled LLW and remote-handled LLW ion-exchange resins from the Advanced Test Reactor in the open pit of the SDA ceased September 30, 2008. Disposal of remote-handled LLW in concrete disposal vaults at RWMC will continue until the facility is full or until it must be closed in preparation for final remediation of the SDA (approximately at the end of fiscal year FY 2017). The continuing nuclear mission of INL, associated ongoing and planned operations, and Naval spent fuel activities at the Naval Reactors Facility (NRF) require continued capability to appropriately dispose of contact and remote handled LLW. A programmatic analysis of disposal alternatives for contact and remote-handled LLW generated at INL was conducted by the INL contractor in Fiscal Year 2006; subsequent evaluations were completed in Fiscal Year 2007. The result of these analyses was a recommendation to the Department of Energy (DOE) that all contact-handled LLW generated after September 30, 2008, be disposed offsite, and that DOE proceed with a capital project to establish replacement remote-handled LLW disposal capability. An analysis of the alternatives for providing replacement remote-handled LLW disposal capability has been performed to support Critical Decision-1. The highest ranked alternative to provide this required capability has been determined to be the development of a new onsite remote-handled LLW disposal facility to replace the existing remote-handled LLW disposal vaults at the SDA. Several offsite DOE

  15. Hoisting appliances and fuel handling equipment at nuclear facilities

    International Nuclear Information System (INIS)

    1987-01-01

    The guide is followed by the Finnish Centre for Radiation and Nuclear Safety (STUK) in regulating hoisting and handling equipment Class 3 at nuclear facilities. The guide is applied e.g. to the following equipment: reactor building overhead cranes, hoisting appliances at nuclear fuel storages, fuel handling machines, other hoisting appliances, which because of nuclear safety aspects are classified in Safety Class 3, and load-bearing devices connected with the above equipment, such as replaceable hoisting tools and auxiliary lifting devices. The regulating of hoisting and handling equipment comprises the following stages: handling of preliminary and final safety analysis reports, inspection of the construction plan, supervision of fabrication and construction inspection, and supervision of initial start-up and commissioning inspection

  16. Demonstration of a remotely operated TRU waste size-reduction and material handling process

    International Nuclear Information System (INIS)

    Stewart, J.A. III; Schuler, T.F.; Ward, C.R.

    1986-01-01

    Noncombustible Pu-238 and Pu-239 waste is generated as a result of normal operation and decommissioning activity at the Savannah River Plant and is being retrievably stored at the site. As part of the long-term plan to process the stored waste and current waste for permanent disposal, a remote size-reduction and material handling process is being tested at Savannah River Laboratory to provide design support for the plant TRU Waste Facility scheduled to be completed in 1993. The process consists of a large, low-speed shredder and material handling system, a remote worktable, a bagless transfer system, and a robotically controlled manipulator, or Telerobot. Initial testing of the shredder and material handling system and a cycle test of the bagless transfer system were completed. Initial Telerobot run-in and system evaluation was completed. User software was evaluated and modified to support complete menu-driven operation. Telerobot prototype size-reduction tooling was designed and successfully tested. Complete nonradioactive testing of the equipment is scheduled to be completed in 1987

  17. Stud bolt handling equipment for reactor vessel

    International Nuclear Information System (INIS)

    Bunyan, T.W.

    1989-01-01

    Reactor vessel stud bolt handling equipment includes means for transferring a stud bolt to a carrier from a parking station, or vice versa. Preferably a number of stud bolts are handled simultaneously. The transfer means may include cross arms rotatable about extendable columns, and the equipment is mounted on a mobile base for movement into and out of position. Each carrier comprises a tubular socket and an expandable sleeve to grip a stud bolt. (author)

  18. Optimized hardware design for the divertor remote handling control system

    Energy Technology Data Exchange (ETDEWEB)

    Saarinen, Hannu [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland)], E-mail: hannu.saarinen@tut.fi; Tiitinen, Juha; Aha, Liisa; Muhammad, Ali; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Jaervenpaeae, Jorma [VTT Systems Engineering, Tekniikankatu 1, 33720 Tampere (Finland); Irving, Mike; Damiani, Carlo; Semeraro, Luigi [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain)

    2009-06-15

    A key ITER maintenance activity is the exchange of the divertor cassettes. One of the major focuses of the EU Remote Handling (RH) programme has been the study and development of the remote handling equipment necessary for divertor exchange. The current major step in this programme involves the construction of a full scale physical test facility, namely DTP2 (Divertor Test Platform 2), in which to demonstrate and refine the RH equipment designs for ITER using prototypes. The major objective of the DTP2 project is the proof of concept studies of various RH devices, but is also important to define principles for standardizing control hardware and methods around the ITER maintenance equipment. This paper focuses on describing the control system hardware design optimization that is taking place at DTP2. Here there will be two RH movers, namely the Cassette Multifuctional Mover (CMM), Cassette Toroidal Mover (CTM) and assisting water hydraulic force feedback manipulators (WHMAN) located aboard each Mover. The idea here is to use common Real Time Operating Systems (RTOS), measurement and control IO-cards etc. for all maintenance devices and to standardize sensors and control components as much as possible. In this paper, new optimized DTP2 control system hardware design and some initial experimentation with the new DTP2 RH control system platform are presented. The proposed new approach is able to fulfil the functional requirements for both Mover and Manipulator control systems. Since the new control system hardware design has reduced architecture there are a number of benefits compared to the old approach. The simplified hardware solution enables the use of a single software development environment and a single communication protocol. This will result in easier maintainability of the software and hardware, less dependence on trained personnel, easier training of operators and hence reduced the development costs of ITER RH.

  19. Remote-Handled Low-Level Waste Disposal Project Code of Record

    Energy Technology Data Exchange (ETDEWEB)

    S.L. Austad, P.E.; L.E. Guillen, P.E.; C. W. McKnight, P.E.; D. S. Ferguson, P.E.

    2012-06-01

    The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by the Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.

  20. Remote-Handled Low-Level Waste Disposal Project Code of Record

    Energy Technology Data Exchange (ETDEWEB)

    S.L. Austad, P.E.; L.E. Guillen, P.E.; C. W. McKnight, P.E.; D. S. Ferguson, P.E.

    2014-06-01

    The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by the Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.

  1. Remote-Handled Low-Level Waste Disposal Project Code of Record

    Energy Technology Data Exchange (ETDEWEB)

    Austad, S. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Guillen, L. E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); McKnight, C. W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ferguson, D. S. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by the Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.

  2. Observations on human-technology interaction aspects in remote handling for fusion

    International Nuclear Information System (INIS)

    Salminen, Karoliina

    2009-01-01

    Remote handling can been seen as cooperation between human and machine. One of the characteristics of remote handling is that there is always a human involved in the technique: there is always a human guiding and supervising the movements and deciding the actions of the machine. Unlike many other fields of remote handling for fusion, the human-technology interaction side has not been studied carefully recently. The state-of-the-art research about different kinds of remote handling systems shows that there is a lot of information available in this subject, but there is a clear need for studies where the special needs of ITER are taken into account. During the PREFIT programme, the human-interaction aspects of remote handling have been studied, and the goal has been to find solutions compatible with ITER. Some of the aspects that make ITER a unique system are its new technology combining state-of-the-art knowledge from several different fields, and its very international working environment. When discussing the human aspects, the fact of the multinational cooperation cannot be neglected. Since the majority of the information found in the literature review is not about remote handling, references need to be taken from other industries, like aviation. This article consists of ITER remote handling relevant findings in state-of-the-art research and information and knowledge gained during the PREFIT programme, especially during the training periods at JET in Culham and at CEA in Fontenay-aux-Roses. It also discusses the importance of human-technology interaction field in remote handling, especially in ITER.

  3. Remote handling of JET in-torus components. A practical experience

    International Nuclear Information System (INIS)

    Mills, S.; Brade, R.; Edwards, P.

    2000-01-01

    This paper summarises the experiences gained from the extensive handling of JET components inside the torus. The problems involved with handling components not designed to be remotely handled and the methods used to overcome them are described and discussed with specific examples from recent JET remote operations. The method employed for remotely producing structural TIG welds is explained. The problems of dextrous manipulation in an inverted attitude are discussed and the methods of amelioration are described

  4. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  5. Bionic design methodology for wear reduction of bulk solids handling equipment

    NARCIS (Netherlands)

    Chen, G.; Schott, D.L.; Lodewijks, G.

    2016-01-01

    Large-scale handling of particulate solids can cause severe wear on bulk solids handling equipment surfaces. Wear reduces equipment life span and increases maintenance cost. Examples of traditional methods to reduce wear of bulk solids handling equipment include optimizing transport operations

  6. Hoisting appliances and fuel handling equipment at nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-31

    The guide is followed by the Finnish Centre for Radiation and Nuclear Safety (STUK) in regulating hoisting and handling equipment Class 3 at nuclear facilities. The guide is applied e.g. to the following equipment: reactor building overhead cranes, hoisting appliances at nuclear fuel storages, fuel handling machines, other hoisting appliances, which because of nuclear safety aspects are classified in Safety Class 3, and load-bearing devices connected with the above equipment, such as replaceable hoisting tools and auxiliary lifting devices. The regulating of hoisting and handling equipment comprises the following stages: handling of preliminary and final safety analysis reports, inspection of the construction plan, supervision of fabrication and construction inspection, and supervision of initial start-up and commissioning inspection. 36 refs. Translation. The original text is published under the same guide number. The guide is valid from 5 January 1987 and will be in force until further notice.

  7. Remote-automated inspection and maintenance of nuclear power plant equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Masayoshi; Nakano, Yoshiyuki

    1984-12-01

    Employing remote-control inspection and maintenance equipment in nuclear power plants increases the plant availability by decreasing the annual shutdown time (outage), as well as radiation exposure and man-power. This paper presents an outline of the latest designs for an automatic refueling machine, a control rod drive handling machine, a fuel preparation machine, and a main steam line plug, which were supplied to the Fukushima Dai-Ni No. 2 Plant of the Tokyo Electric Power Co., Inc. (Fukushima 2-2). Also, the up-to-date developments of other new automatic machines, such as a CRD disassembly and cleaning system, spent fuel channel box volume reduction equipment, and robotics for nuclear plant use are presented.

  8. Development of equipments for remote dismantling of joule heated ceramic melter

    International Nuclear Information System (INIS)

    Badgujar, Kiran T.; Usarkar, Sachin G.; Kumar, Binu; Nair, K.N.S.

    2011-01-01

    Joule Heated Ceramic Melter (JHCM) technology has been adopted for industrial scale vitrification of high level liquid waste (HLLW) at Tarapur and Kalpakkam. The melter installed at Advanced Vitrification System (AVS), Tarapur has immobilized 175 m 3 of HLLW in 113 canisters containing 11533Kg of Vitrified Waste Product (VWP). The melter has been in operation for 3 years before shutdown. It is intended to demonstrate the complete procedure of dismantling of Joule Melter in 1:1 scale prior to going in for actual dismantling in the hot cell. The Melter consists of an assembly of Inconel/SS pipes and plates, fuse cast refractories, thermal insulations of various types inside a SS casing and possibly some glass which is left over in the melter. Dismantling of melter involves remote cutting of the outer casing, pipe connections, electrical connections and removal, sizing and packing of internals in a sequential manner to minimise generation of secondary waste. The challenge involves development of remotely operated multi-degrees of freedom fixtures, modification and performance testing of standard industrial cutting and breaking tools and adapting them for remote operations. The work also involves development of equipments for collection of waste generated during the dismantling operation and packaging thus in special packages. Remotely actuated fixtures have been developed for remote top plate and side electrodes cutting. Remotely operated grab has been developed for handling of loose material and grippers have been developed for handling of refractory blocks. Industrial vacuum suction device has been modified into split units to enable for reducing the spread of powder material, while dismantling in progress. The performance test of developed fixtures, equipments, cutting and breaking tools have been carried on 1:1 scale melter model. Various parameters like cutting speed, cutting tool performance, generation of waste volume has been measured and analysed for

  9. Remote handling design for moderator-reflector maintenance in JSNS

    International Nuclear Information System (INIS)

    Teshigawara, Makoto; Aizawa, Hideyuki; Harada, Masahide; Kinoshita, Hidetaka; Meigo, Shinichiro; Maekawa, Fujio; Kaminaga, Masanori; Kato, Takashi; Ikeda, Yujiro

    2005-05-01

    This report introduces the present design status of remote-handling devices for activated and used components such as moderator and reflector in a spallation neutron source of the Material and Life Science Facility (MLF) at J-PARC (Japan Proton Accelerator Research Complex). The design concept and maintenance scenario are also mentioned. A key maintenance scenario adopts that the used components should be taken out from the MLF to the other storage facility after the volume reduction of them. Almost full remote handling is available to the maintenance work except for the connection/disconnection pipes of the cooling water. Remote handling for the cooling water system is under designing and it will be prepared before being significant radiation dose by accumulation of beryllium ( 7 Be) in future. Total six remote handling devices are used for moderator-reflector maintenance. They are also available to the proton beam window and muon target maintenance. Maintenance scenario is separated into two works. One is to replace used components to new ones during beam-stop and the other is dispose used components during beam operation. Required period of replacement work is estimated to be ∼15 days, on the other hand, the disposal work is ∼26 days after dry up work (∼30 days), respectively. Study of the maintenance scenario and the remote handling design brings about the reasonable procedures and period of the maintenance work. (author)

  10. Safety requirements and feedback of commonly used material handling equipment

    International Nuclear Information System (INIS)

    Pathak, M.K.

    2009-01-01

    Different types of cranes, hoists, chain pulley blocks are the most commonly used material handling equipment in industry along with attachments like chains, wire rope slings, d-shackles, etc. These equipment are used at work for transferring loads from one place to another and attachments are used for anchoring, fixing or supporting the load. Selection of the correct equipment, identification of the equipment planning of material handling operation, examination/testing of the equipment, education and training of the persons engaged in operation of the material handling equipment can reduce the risks to safety of people in workplace. Different safety systems like boom angle indicator, overload tripping device, limit switches, etc. should be available in the cranes for their safe use. Safety requirement for safe operation of material handling equipment with emphasis on different cranes and attachments particularly wire rope slings and chain slings have been brought out in this paper. An attempt has also been made to bring out common nature of deficiencies observed during regulatory inspection carried out by AERB. (author)

  11. Preliminary Safety Design Report for Remote Handled Low-Level Waste Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Solack; Carol Mason

    2012-03-01

    A new onsite, remote-handled low-level waste disposal facility has been identified as the highest ranked alternative for providing continued, uninterrupted remote-handled low-level waste disposal for remote-handled low-level waste from the Idaho National Laboratory and for nuclear fuel processing activities at the Naval Reactors Facility. Historically, this type of waste has been disposed of at the Radioactive Waste Management Complex. Disposal of remote-handled low-level waste in concrete disposal vaults at the Radioactive Waste Management Complex will continue until the facility is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). This preliminary safety design report supports the design of a proposed onsite remote-handled low-level waste disposal facility by providing an initial nuclear facility hazard categorization, by discussing site characteristics that impact accident analysis, by providing the facility and process information necessary to support the hazard analysis, by identifying and evaluating potential hazards for processes associated with onsite handling and disposal of remote-handled low-level waste, and by discussing the need for safety features that will become part of the facility design.

  12. Remote handling in ZEPHYR

    International Nuclear Information System (INIS)

    Andelfinger, C.; Lackner, E.; Ulrich, M.; Weber, G.; Schilling, H.B.

    1982-04-01

    A conceptual design of the ZEPHYR building is described. The listed radiation data show that remote handling devices will be necessary in most areas of the building. For difficult repair and maintenance works it is intended to transfer complete units from the experimental hall to a hot cell which provides better working conditions. The necessary crane systems and other transport means are summarized as well as suitable commercially available manipulators and observation devices. The conept of automatic devices for cutting and welding and other operations inside the vacuum vessel and the belonging position control system is sketched. Guidelines for the design of passive components are set up in order to facilitate remote operation. (orig.)

  13. Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-04-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  14. Remote-Handled Low Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2010-10-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  15. Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-03-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  16. Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2010-06-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  17. Remote Handling Devices for Disposition of Enriched Uranium Reactor Fuel Using Melt-Dilute Process

    International Nuclear Information System (INIS)

    Heckendorn, F.M.

    2001-01-01

    Remote handling equipment is required to achieve the processing of highly radioactive, post reactor, fuel for the melt-dilute process, which will convert high enrichment uranium fuel elements into lower enrichment forms for subsequent disposal. The melt-dilute process combines highly radioactive enriched uranium fuel elements with deleted uranium and aluminum for inductive melting and inductive stirring steps that produce a stable aluminum/uranium ingot of low enrichment

  18. Waste Handling Equipment Development Test and Evaluation Study

    International Nuclear Information System (INIS)

    R.L. Tome

    1998-01-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M and O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T and EP), Reference 5.1, was used as a basis for this study. The MGR T and EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T and EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T and EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  19. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  20. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  1. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  2. Evaluation of a New Remote Handling Design for High Throughput Annular Centrifugal Contactors

    International Nuclear Information System (INIS)

    Meikrantz, David H.; Garn, Troy G.; Law, Jack D.; Macaluso, Lawrence L.

    2009-01-01

    individual stages while retaining the benefits of commercially reliable ACC equipment for remote applications in the nuclear industry. Minor modifications and suggestions for improved manual remote servicing by the remote handling specialists were provided but successful removal and replacement was demonstrated in the first prototype.

  3. Simulating and visualizing deflections of a remote handling mechanism

    International Nuclear Information System (INIS)

    Saarinen, Hannu; Hämäläinen, Vesa; Karjalainen, Jaakko; Määttä, Timo; Siuko, Mikko; Esqué, Salvador; Hamilton, David

    2013-01-01

    Highlights: ► An infinitesimal transformation represents elastic deflections. ► Equivalent spring factor is used to combine several deformations. ► Initial VR model accuracy improved from 80 to 5 mm. ► The deflection model is capable of adapting to changes in load at the end-effector. ► The algorithms and approach described are generic and can be adopted for other mechanisms. -- Abstract: Continuing ITER divertor second cassette (SC) remote handling (RH) test campaign has been carried out at divertor test platform (DTP2) in Finland. One of the goals has been to develop and implement efficient algorithms and software tools for simulating and visualizing for the operator the non-instrumented deflections of the RH mechanisms under loading conditions. Based on assumptions of the classical beam theory, the presented solution suggests utilization of an infinitesimal transformation to represent elastic deflections in a mechanical structure. Both structural analysis and measurements of the real structure are utilised during the process. The solution suggests one possible implementation strategy of a software component called structural simulator (SS), which is a software component of the remote handling control system (RHCS) architectural model specified by ITER organisation. Utilisation of the proposed SS necessitates modification of the initial virtual reality (VR) model of RH equipment to a format, which can visually represent the structural deflections. In practise this means adding virtual joints into the model. This will improve the accuracy of the VR visualization and will ensure that the virtual representation of the RH equipment closely aligns with the actual RH equipment. Cassette multifunctional mover (CMM) and second cassette end effector (SCEE) carrying SC were selected to be the initial target system for developing the approach. Demonstrations proved that the approach used can give high levels of accuracy even in complex structures such as the CMM

  4. Simulating and visualizing deflections of a remote handling mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Saarinen, Hannu, E-mail: hannu.saarinen@vtt.fi [VTT, Technical Research Centre of Finland, Tekniikankatu 1, 33720 Tampere (Finland); Hämäläinen, Vesa; Karjalainen, Jaakko; Määttä, Timo; Siuko, Mikko [VTT, Technical Research Centre of Finland, Tekniikankatu 1, 33720 Tampere (Finland); Esqué, Salvador [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► An infinitesimal transformation represents elastic deflections. ► Equivalent spring factor is used to combine several deformations. ► Initial VR model accuracy improved from 80 to 5 mm. ► The deflection model is capable of adapting to changes in load at the end-effector. ► The algorithms and approach described are generic and can be adopted for other mechanisms. -- Abstract: Continuing ITER divertor second cassette (SC) remote handling (RH) test campaign has been carried out at divertor test platform (DTP2) in Finland. One of the goals has been to develop and implement efficient algorithms and software tools for simulating and visualizing for the operator the non-instrumented deflections of the RH mechanisms under loading conditions. Based on assumptions of the classical beam theory, the presented solution suggests utilization of an infinitesimal transformation to represent elastic deflections in a mechanical structure. Both structural analysis and measurements of the real structure are utilised during the process. The solution suggests one possible implementation strategy of a software component called structural simulator (SS), which is a software component of the remote handling control system (RHCS) architectural model specified by ITER organisation. Utilisation of the proposed SS necessitates modification of the initial virtual reality (VR) model of RH equipment to a format, which can visually represent the structural deflections. In practise this means adding virtual joints into the model. This will improve the accuracy of the VR visualization and will ensure that the virtual representation of the RH equipment closely aligns with the actual RH equipment. Cassette multifunctional mover (CMM) and second cassette end effector (SCEE) carrying SC were selected to be the initial target system for developing the approach. Demonstrations proved that the approach used can give high levels of accuracy even in complex structures such as the CMM

  5. Development of remote handling tools for glove box

    International Nuclear Information System (INIS)

    Tomita, Yutaka; Nemoto, Takeshi; Denuma, Akio; Todokoro, Akio

    1996-01-01

    For a part of advanced nuclear fuel recycling technology development, we will separate and recover Americium from the MOX fuel scrap by solvent extraction. When we carry this examination, reduction of exposure from Americium-241 is one of important problems. To solve this problem fundamentally, we studied many joints type of the remote handling tools for glove box and produced a trial production machine. Also, we carried out basic function examinations of it. As a result, we got the prospect of development of the remote handling tools which could treat Americium in glove box. (author)

  6. Testing of FFTF fuel handling equipment

    International Nuclear Information System (INIS)

    Coleman, D.W.; Grazzini, E.D.; Hill, L.F.

    1977-07-01

    The Fast Flux Test Facility has several manual/computer controlled fuel handling machines which are exposed to severe environments during plant operation but still must operate reliably when called upon for reactor refueling. The test programs for two such machines--the Closed Loop Ex-Vessel Machine and the In-Vessel Handling Machine--are described. The discussion centers on those areas where design corrections or equipment repairs substantiated the benefits of a test program prior to plant operation

  7. Failure Mode and Effect Analysis for remote handling transfer systems of ITER

    International Nuclear Information System (INIS)

    Pinna, T.; Caporali, R.; Tesini, A.

    2008-01-01

    A Failure Mode and Effect Analysis (FMEA) at component level was done to study safety-relevant implications arising from possible failures in performing remote handling (RH) operations at ITER facility . Autonomous air cushion transporter, pallet, sealed casks and tractor movers needed for port plug mounting/dismantling operation were analysed. For each sub-system, the breakdown of significant components was outlined and, for each component, possible failure modes have been investigated pointing out possible causes, possible actions to prevent the causes, consequences and actions to prevent or mitigate consequences. Off-normal events which may result in hazardous consequences to the public and the environment have been defined as Postulated Initiating Events (PIEs). Two safety-relevant PIEs have been defined by assessing elementary failures related to the analysed system. Each PIE has been discussed in order to qualitatively identify accident sequences arising from each of them. As an output of this FMEA study, possible incidental scenarios, where the intervention of rescue RH equipments is required to overcome critical situations determined by fault of RH components, were defined as well. Being rescue scenarios of main concern for ITER remote handling activities, such families could be helpful in defining the design requirements of port handling systems in general and on RH transfer system in particular. Furthermore, they could be useful in defining casks and vehicles to be used for rescue activities

  8. Experience in testing and inspection and maintenance of material handling equipments

    International Nuclear Information System (INIS)

    Sharma, M.L.

    2009-01-01

    All the Industries, Power Projects/Stations, Organizations engaged in the field of process of manufacturing, power generation, transportation, design, layout, manufacturing, and supply have to utilize material handling equipment, machinery tools tackles, lifting gears for performing their tasks/activities. The major role of the material handling equipments play an important role and a component of 40% of the total activities of the system/process to achieve targeted output with the reliability and quality is performed by material handling equipment and machineries. The material handling equipment shall have to be chosen/selected to suit the process requirement at times to be specifically designed inspected and tested to meet the specific requirement. These equipment/machineries/lifting gears have to undergo for the periodical inspection and testing to qualify for further use in a specified period. All those equipment and machinery to be used for material handling if not found satisfactory during inspection and testing or otherwise also shall be dismantled/stripped to the extent of inspection requirement of the components/sub components and maintenance repair shall have to be done to make them worthy for reuse after testing and inspection duly witnessed by competent authority

  9. NET remote workstation

    International Nuclear Information System (INIS)

    Leinemann, K.

    1990-10-01

    The goal of this NET study was to define the functionality of a remote handling workstation and its hardware and software architecture. The remote handling workstation has to fulfill two basic functions: (1) to provide the man-machine interface (MMI), that means the interface to the control system of the maintenance equipment and to the working environment (telepresence) and (2) to provide high level (task level) supporting functions (software tools) during the maintenance work and in the preparation phase. Concerning the man-machine interface, an important module of the remote handling workstation besides the standard components of man-machine interfacing is a module for graphical scene presentation supplementing viewing by TV. The technique of integrated viewing is well known from JET BOOM and TARM control using the GBsim and KISMET software. For integration of equipment dependent MMI functions the remote handling workstation provides a special software module interface. Task level support of the operator is based on (1) spatial (geometric/kinematic) models, (2) remote handling procedure models, and (3) functional models of the equipment. These models and the related simulation modules are used for planning, programming, execution monitoring, and training. The workstation provides an intelligent handbook guiding the operator through planned procedures illustrated by animated graphical sequences. For unplanned situations decision aids are available. A central point of the architectural design was to guarantee a high flexibility with respect to hardware and software. Therefore the remote handling workstation is designed as an open system based on widely accepted standards allowing the stepwise integration of the various modules starting with the basic MMI and the spatial simulation as standard components. (orig./HP) [de

  10. Development of simulator for remote handling system of ITER blanket

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakanhira, Masataka; Matsumoto, Yasuhiro; Shibanuma, K.

    2007-01-01

    The maintenance activity in the ITER has to be performed remotely because 14 MeV neutron caused by fusion reaction induces activation of structural material and emission of gamma ray. In general, it is one of the most critical issues to avoid collision between the remote maintenance system and in-vessel components. Therefore, the visual information in the vacuum vessel is required strongly to understand arrangement of these devices and components. However, there is a limitation of arrangement of viewing cameras in the vessel because of high intensity of gamma ray. It is expected that enough numbers of cameras and lights are not available because of arrangement restriction. Furthermore, visibility of the interested area such as the contacting part is frequently disturbed by the devices and components, thus it is difficult to recognize relative position between the devices and components only by visual information even if enough cameras and lights are equipped. From these reasons, the simulator to recognize the positions of each devices and components is indispensable for remote handling systems in fusion reactors. The authors have been developed a simulator for the remote maintenance system of the ITER blanket using a general 3D robot simulation software ''ENVISION''. The simulator is connected to the control system of the manipulator which was developed as a part of the blanket maintenance system in the EDA and can reconstruct the positions of the manipulator and the blanket module using the position data of the motors through the LAN. In addition, it can provide virtual visual information, such as the connecting operation behind the blanket module with making the module transparent on the screen. It can be used also for checking the maintenance sequence before the actual operation. The developed simulator will be modified further adding other necessary functions and finally completed as a prototype of the actual simulator for the blanket remote handling system

  11. Overview of remote handling technologies developed for inspection and maintenance of spent fuel management facilities in France

    Energy Technology Data Exchange (ETDEWEB)

    Desbats, Philippe [CEA - Direction de la Recherche Technologique / LIST, BP 6 - 92265, Fontenay-aux-Roses cedex (France); Piolain, Gerard [COGEMA-HAG/DMCO, AREVA NC SA, 2, rue Paul Dautier, BP 4, 78 141 Velizy Cedex (France)

    2006-07-01

    In the facilities of the end of the nuclear fuel cycle, like spent fuel storage pools, reprocessing plants, Plutonium-based fuel manufacturing plants or waste temporary storage units, materials handling must be carried out remotely, taking into account the nuclear radiating environment. In addition to the automation requirement, robotics equipment in the nuclear industry must be substituted to human operators in order to respect the ALARA principle. More over, remote handling technologies aim to improve the working conditions, as well as the quality of the work achieved by the operators. Ten years ago, COGEMA (AREVA Group) and CEA (French Atomic Energy Agency) started an ambitious R and D program in robotics and remote handling technologies applied to COGEMA spent fuel management facilities in France, with the aim to cover the requirements of the different plant life cycle steps. The paper gives an overview of the important developments that have been carried out by CEA and then transferred to the COGEMA industrial group. The range includes the next generation of servo-manipulators, long range inspection tools and carriers, nuclear versions of industrial robots, radiation hardened electronic systems, interactive environment modeling tools, as well as force-feedback master-slave generic control software for tele-operation systems. Some applications of this development are presented in the paper: - rad-hard electronic modules for robotic equipment which are used by COGEMA in high radiating environment; - long reach articulated carrier for inspection of spent full management blind cells; - new electrical force feedback master/slave system to improve the tele-operation of standard tele-manipulators; - generic control software for tele-manipulators. The results of the robotic program carried out by COGEMA and CEA have been very valuable for the introduction of new technologies inside nuclear industry. Innovative products and sub-systems can be integrated now in a large

  12. Calibration and compensation of deflections and compliances in remote handling equipment configurations

    International Nuclear Information System (INIS)

    Kivelae, Tuomo; Saarinen, H.; Mattila, J.; Haemaelaeinen, V.; Siuko, M.; Semeraro, L.

    2011-01-01

    This paper presents a generic method of calibrating and compensating remote handling system configurations subject to manufacturing and assembly tolerances, deflections and compliances. A method consists of kinematic part and non-kinematic part. A kinematic calibration algorithm is presented for finding the values of kinematic model errors by measuring the end-effector Cartesian position. This is a conventional way to calibrate industrial robots. However, in this case the kinematic calibration is not able to compensate flaws fully due to large deflections and compliances caused by a massive Cassette payload (approx. 9 ton). Positioning error at the furthest point of the cassette before any compensation was 80 mm. Therefore, extra compensation must be introduced in addition to a kinematic calibration. A kinematic calibration together with an extra compensation is a demanding task to carry out. The resulting complex compensation function has to be such that it can be implemented in real-time Cassette Multifunctional Mover (CMM) control system software.

  13. Report of the remote-handled transuranic waste mock retrieval demonstration

    International Nuclear Information System (INIS)

    1987-05-01

    This report documents the results of the mock, onsite retrieval demonstration that was conducted on May 19 and 20, 1987, for representatives of the New Mexico Environmental Evaluation Group (EEG). Demonstration of the retrievability of remote-handled transuranic (RH TRU) waste is part of a milestone included in the Agreement for Consultation and Cooperation between the state of New Mexico and the United States Department of Energy. Retrieval equipment design documents and a retrievability demonstration plan for RH TRU waste were previously transmitted to the EEG. This report documents the results of the demonstration by evaluating the demonstration against the acceptance criteria that were established in the Demonstration Plan. 1 fig., 2 tabs

  14. Review on Fuel Loading Process and Performance for Advanced Fuel Handling Equipment

    International Nuclear Information System (INIS)

    Chang, Sang-Gyoon; Lee, Dae-Hee; Kim, Young-Baik; Lee, Deuck-Soo

    2007-01-01

    The fuel loading process and the performance of the advanced fuel handling equipment for OPR 1000 (Optimized Power Plant) are analyzed and evaluated. The fuel handling equipment, which acts critical processes in the refueling outage, has been improved to reduce fuel handling time. The analysis of the fuel loading process can be a useful tool to improve the performance of the fuel handling equipment effectively. Some recommendations for further improvement are provided based on this study

  15. Remote systems and automation in radioactive waste package handling

    International Nuclear Information System (INIS)

    Gneiting, B.C.; Hayward, M.L.

    1987-01-01

    A proof-of-principle test was conducted at the Hanford Engineering Development Laboratory (HEDL) to demonstrate the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. This development testing showed feasibility of performing critical cask receipt, preparation, and unloading operations from a single control station using remote controls and indirect viewing. Using robotics and remote automation in a cask handling system can result in lower personnel exposure levels and cask turnaround times while maintaining operational flexibility. An automated cask handling system presents a flexible state-of-the-art, cost effective alternative solution to hands-on methods that have been used in the past

  16. Application of remote handling compatibility on ITER plant

    International Nuclear Information System (INIS)

    Sanders, S.; Rolfe, A.; Mills, S.F.; Tesini, A.

    2011-01-01

    The ITER plant will require fully remote maintenance during its operational life. For this to be effective, safe and efficient the plant will have to be developed in accordance with remote handling (RH) compatibility requirements. A system for ensuring RH compatibility on plant designed for Tokamaks was successfully developed and applied, inter alia, by the authors when working at the JET project. The experience gained in assuring RH compatibility of plant at JET is now being applied to RH relevant ITER plant. The methodologies required to ensure RH compatibility of plant include the standardization of common plant items, standardization of RH features, availability of common guidance on RH best practice and a protocol for design and interface review and approval. The protocol in use at ITER is covered by the ITER Remote Maintenance Management System (IRMMS) defines the processes and utilization of management controls including Plant Definition Forms (PDF), Task Definition Forms (TDFs) and RH Compatibility Assessment Forms (RHCA) and the ITER RH Code of Practice. This paper will describe specific examples where the authors have applied the methodology proven at JET to ensure remote handling compatibility on ITER plant. Examples studied are: ·ELM coils (to be installed in-vessel behind the Blanket Modules) - handling both in-vessel, in Casks and at the Hot Cell as well as fully remote installation and connection (mechanical and electrical) in-vessel. ·Neutral beam systems (in-vessel and in the NB Cell) - beam sources, cesium oven, beam line components (accessed in the NB Cell) and Duct Liner (remotely replaced from in-vessel). ·Divertor (in-vessel) - cooling pipe work and remotely operated electrical connector. The RH compatibility process can significantly affect plant design. This paper should therefore be of interest to all parties who develop ITER plant designs.

  17. Ex-vessel remote maintenance for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist in removing and repairing such components as diagnostic modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the plasma chamber includes a bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid-radiation-waste-handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design were addressed in fiscal year (FY) 1987, including conceptual designs of manipulator systems, the start of a remote equipment research and development (RandD) program, and definition of the hot cell, decon, and equipment repair facility requirements. R and D work included preliminary demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development (ROMD) Facility. 1 ref., 6 figs

  18. Development of radiation-hard electric connector with ball bearing for in-vessel remote maintenance equipment of ITER

    International Nuclear Information System (INIS)

    Ito, Akira; Obara, Kenjiro; Tada, Eisuke; Morita, Yousuke; Yagi, Toshiaki; Iida, Kazuhisa; Sato, Masaru.

    1997-12-01

    Development of radiation-hard electric connector with ball bearing for in-vessel remote maintenance equipment of ITER (International Thermonuclear Experimental Reactor) has been conducted. Since the in-vessel remote maintenance equipment is operated under the condition of 10 6 R/h gamma ray dose rate, the electric connector has to be radiation hard for an accumulation dose of 10 10 R. In addition, the simple attachment/removal mechanism is essential for remote operation. For this, the alumina (Al203) ceramics and a ball bearing were adopted to electric insulator and plug (male) of connector, respectively. The handling tests on attachment/removal of the connector were conducted by using master slave manipulator and general purpose robot with handling tool, and as a result, the validity of the attachment/removal mechanism was verified. In the gamma ray irradiation tests, which are under way, no degradation in break down voltage (1000V 1min.) up to 10 10 R was confirmed. However insulation resistance and contact resistance between contact pin and contact socket were deteriorated in proportion to the accumulation dose. Increase of contact resistance is considered due to an erosion of contact pin. (author)

  19. Automation and remote handling activities in BARC: an overview

    International Nuclear Information System (INIS)

    Badodkar, D.N.

    2016-01-01

    Division of Remote Handling and Robotics, BARC has been working on design and development of various application specific remote handling and automation systems for nuclear front-end and back-end fuel cycle technologies. Division is also engaged in preservice and in-service inspection of coolant channels for Pressurized Heavy Water Reactors in India. Design and development of Reactor Control Mechanisms for Nuclear Research and Power Reactors (PHWRs and Compact LWRs) is another important activity carried out in this division. Robotic systems for Indoor and Outdoor surveillance in and around nuclear installations have also been developed. A line scan camera based system has been developed for measuring individual PHWR fuel pellet lengths as well as stack length. An industrial robot is used for autonomous exchange of pellets to achieve desired stack length. The system can be extended for active fuel pellets also. An automation system has been conceptualized for remote handling and transfer of spent fuel bundles from storage pool directly to the chopper unit of reprocessing plant. In case of Advanced Heavy Water Reactor which uses mixed oxides of (Th-Pu) and (Th-"2"3"3U ) as fuel, automation system for front-end fuel cycle has been designed, which includes Powder processing and pressing; Pellet handling and inspection; Pin handling and inspection; and Cluster assembly and dis-assembly in shielded facilities. System demonstration through fullscale mock-up facility is nearing completion. Above talk is presented on behalf of all the officers and staff of DRHR. The talk is mainly focused on development of an automated fuel fabrication facility for mixed oxides of (Th- Pu)/(Th-"2"3"3U ) fuel pins. An overview of divisional ongoing activities in the field of remote handling and automation are also covered. (author)

  20. Remote systems and automation in radioactive waste package handling

    International Nuclear Information System (INIS)

    Gneiting, B.C.; Hayward, M.L.

    1987-01-01

    A proof-of-principle test was conducted at the Hanford Engineering Development Laboratory (HEDL) to demonstrate the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. This development testing showed feasibility of performing critical cask receipt, preparation, and unloading operations from a single control station using remote controls and indirect viewing. Using robotics and remote automation in a cask handling system can result in lower personnel exposure levels and cask turnaround times while maintaining operational flexibility. An automated cask handling system presents a flexible state-of-the-art, cost effective alternative solution to hands-on methods that have been used in the past. 7 refs., 13 figs

  1. Studies and research concerning BNFP: cask handling equipment standardization

    International Nuclear Information System (INIS)

    McCreery, P.N.

    1980-10-01

    This report covers the activities of one of the sub-tasks within the Spent LWR Fuel Transportation Receiving, Handling, and Storage program. The sub-task is identified as Cask Handling Equipment Standardization. The objective of the sub-task specifies: investigate and identify opportunities for standardization of cask interface equipment. This study will examine the potential benefits of standardized yokes, decontamination barriers and special tools, and, to the extent feasible, standardized methods and software for handling the variety of casks presently available in the US fleet. The result of the investigations is a compilation of reports that are related by their common goal of reducing cask turnaround time

  2. Renewal of handling and storage equipment in wholesale company

    Directory of Open Access Journals (Sweden)

    Tânia Brasileiro Azevedo Teixeira

    2015-06-01

    Full Text Available This paper presents a use of methodology for renewing handling and storage equipment in a wholesale company. It is based on equipment maintenance, downtime and possession costs. With the analysis performed,, it was possible to make some suggestions for an optimal economic point for pallets replacement. The methodology is based on mathematical and economic principles in order to provide the organization with an increase in productivity and costs reduction for handling and storage equipment. As a result of the use of methodology, the conclusion that it was possible to consider that this point is obtained when the total annual cost is equal to the average total cost was reached. Therefore, the equilibrium point is achieved when the equipment usage time is six years.

  3. Conceptual design of divertor cassette handling by remote handling system for JT-60SA

    International Nuclear Information System (INIS)

    Hayashi, Takao; Sakurai, Shinji; Masaki, Kei; Tamai, Hiroshi; Yoshida, Kiyoshi; Matsukawa, Makoto

    2007-01-01

    The JT-60SA aims to contribute and supplement ITER toward DEMO reactor based on tokamak concept. One of the features of JT-60SA is its high power long pulse heating, causing the large annual neutron fluence. Because the expected dose rate at the vacuum vessel (VV) may exceed 1 mSv/hr after 10 years operation and three month cooling, the human access inside the VV is prohibited. Therefore a remote handling (RH) system is necessary for the maintenance and repair of in-vessel components. This paper described the RH system of JT-60SA, especially the expansion of the RH rail and exchange of the divertor modules. The RH rail is divided into nine and three-point mounting. The nine sections can cover 225 degrees in toroidal direction. A divertor module, which is 10 degrees wide in toroidal direction and weighs 500kg itself due to the limitations of port width and handling weight, can be exchanged by heavy weight manipulator (HWM). The HWM brings the divertor module to the front of the other RH port, which is used for supporting the rail and/or carrying in and out equipments. Then another RH device receives and brings out the module by a pallet installed from outside the VV. (author)

  4. Conceptual design of divertor cassette handling by remote handling system of JT-60SA

    International Nuclear Information System (INIS)

    Hayashi, Takao; Sakurai, Shinji; Masaki, Kei; Tamai, Hiroshi; Yoshida, Kiyoshi; Matsukawa, Makoto

    2008-01-01

    The JT-60SA aims to contribute and supplement ITER toward demonstration fusion reactor based on tokamak concept. One of the features of JT-60SA is its high power long pulse heating, causing the large annual neutron fluence. Because the expected dose rate at the vacuum vessel (VV) may exceed 1 mSv/hr after 10 years operation and three month cooling, the human access inside the VV is restricted. Therefore a remote handling (RH) system is necessary for the maintenance and repair of in-vessel components. This paper described the RH system of JT-60SA, especially the expansion of the RH rail and exchange of the divertor cassettes. The RH rail is divided into nine and three-point mounting. The nine sections can cover 225 degrees in toroidal direction. A divertor cassette, which is 10 degrees wide in toroidal direction and weighs 500 kg itself due to the limitations of port width and handling weight, can be exchanged by heavy weight manipulator (HWM). The HWM brings the divertor cassette to the front of the other RH port, which is used for supporting the rail and/or carrying in and out equipments. Then another RH device receives and brings out the cassette by a pallet installed from outside the VV. (author)

  5. Guidelines for remote handling maintenance of ITER neutral beam line components: Proposal of an alternate supporting system

    International Nuclear Information System (INIS)

    Cordier, J.J.; Bayetti, P.; Hemsworth, R.; David, O.; Friconneau, J.P.

    2007-01-01

    Remote handling (R/H) maintenance of ITER components is one of the main challenges of the ITER project. This type of maintenance shall be operational for the assembly and nuclear phase of exploitation of ITER. It must be considered at a very early stage since it significantly impacts on the components design, interfaces management, assembly, maintenance and integration aspects. A large part of the R/H equipment will be procured by the EU Participating Team, including the whole Neutral Beam R/H Equipment. The Neutral Beam Heating and Current Drive system (NB and CD) design is being revisited by the ITER project. A vertical maintenance scheme is presently considered which may significantly impact on the reference design and associated components and lead to a new design of the NB and CD vacuum tank. In addition, NB line components remote handling solutions are being studied. The neutral beam test facility ITER to be built in Europe in the near future is also based on the vertical NB maintenance scheme of beam line components. New design guidelines compliant for both the ITER NB and CD system and the NB test facility proposed by the CEA association are described in the paper

  6. Industrial applications for remote operation in a processing plant

    International Nuclear Information System (INIS)

    Hermier, J.; Le Guennec, R.

    1984-01-01

    In the first part of this article, J. Hermier covers the use of remote handling equipment in the UP2-400 plant at La Hague near Cherbourg, in which for the most part master/slave mechanism remote handling units are used with a number of these employed in daily processing operations. As regards this subject, it is useful to remember that, at the time of the designing of this plant (UP2-400), this was the only equipment available on the market with remote-controlled remote handling equipment. In the second part, before speaking about the development of remote operation equipment in the plants now under construction and attempting to project what might be the remote operation role in future plants, R. Le Guennec reviews the problems faced by engineering in designing industrial-sized processing plants and, consequently, the motivations of engineering when faced with a choice between several possible solutions [fr

  7. Concept for a vertical maintenance remote handling system for multi module blanket segments in DEMO

    International Nuclear Information System (INIS)

    Coleman, M.; Sykes, N.; Cooper, D.; Iglesias, D.; Bastow, R.; Loving, A.; Harman, J.

    2014-01-01

    Highlights: •A conceptual architectural model for a vertical maintenance DEMO is presented. •Novel concepts for a set of DEMO remote handling equipment are put forward. •Remote maintenance of a multi module segment blanket is found to be feasible. •The criticality of space in the vertical port is highlighted. -- Abstract: The anticipated high neutron flux, and the consequent damage to plasma-facing components in DEMO, results in the need to regularly replace the tritium breeding and radiation shielding blanket. The current European multi module segment (MMS) blanket concept favours a less invasive small port entry maintenance system over large sector transport concepts, because of the reduced impact on other tokamak systems – particularly the magnetic coils. This paper presents a novel conceptual remote maintenance strategy for a Vertical Maintenance Scheme DEMO, incorporating substantiated designs for an in-vessel mover, to detach and attach the blanket segments, and cask-housed vertical maintenance devices to open and close access ports, cut and join service connections, and extract blanket segments from the vessel. In addition, a conceptual architectural model for DEMO was generated to capture functional and spatial interfaces between the remote maintenance equipment and other systems. Areas of further study are identified in order to comprehensively establish the feasibility of the proposed maintenance system

  8. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  9. Mission Need Statement for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Harvego, Lisa

    2009-01-01

    The Idaho National Laboratory proposes to establish replacement remote-handled low-level waste disposal capability to meet Nuclear Energy and Naval Reactors mission-critical, remote-handled low-level waste disposal needs beyond planned cessation of existing disposal capability at the end of Fiscal Year 2015. Remote-handled low-level waste is generated from nuclear programs conducted at the Idaho National Laboratory, including spent nuclear fuel handling and operations at the Naval Reactors Facility and operations at the Advanced Test Reactor. Remote-handled low-level waste also will be generated by new programs and from segregation and treatment (as necessary) of remote-handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex. Replacement disposal capability must be in place by Fiscal Year 2016 to support uninterrupted Idaho operations. This mission need statement provides the basis for the laboratory's recommendation to the Department of Energy to proceed with establishing the replacement remote-handled low-level waste disposal capability, project assumptions and constraints, and preliminary cost and schedule information for developing the proposed capability. Without continued remote-handled low-level waste disposal capability, Department of Energy missions at the Idaho National Laboratory would be jeopardized, including operations at the Naval Reactors Facility that are critical to effective execution of the Naval Nuclear Propulsion Program and national security. Remote-handled low-level waste disposal capability is also critical to the Department of Energy's ability to meet obligations with the State of Idaho

  10. The remote handling compatibility analysis of the ITER generic upper port plug structure

    Energy Technology Data Exchange (ETDEWEB)

    Ronden, D.M.S., E-mail: d.m.s.ronden@differ.nl [FOM Institute DIFFER, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Dammann, A. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France); Elzendoorn, B. [FOM Institute DIFFER, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Giacomin, T. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France); Heemskerk, C. [Heemskerk Innovative Technology, Merelhof 2, 2172 HZ Sassenheim (Netherlands); Loesser, D. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543-0451 (United States); Maquet, P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France); Oosterhout, J. van [FOM Institute DIFFER, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Pak, S.; Pitcher, C.S.; Portales, M.; Proust, M.; Udintsev, V.S.; Walsh, M.J. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul-lez-Durance (France)

    2014-10-15

    Highlights: • We describe the remote handling compatibility of the ITER generic upper port plug. • Concepts are presented of specific design solutions to improve RH compatibility. • Simulation in VR of the GUPP DSM replacement indicates possible collisions. • Specific tooling concepts are proposed for GUPP handling equipment for the hot cell. - Abstract: The ITER diagnostics generic upper port plug (GUPP) is developed as a standardized design for all diagnostic upper port plugs, in which a variety of payloads can be mounted. Here, the remote handling compatibility analysis (RHCA) of the GUPP design is presented that was performed for the GUPP final design review. The analysis focuses mainly on the insertion and extraction procedure of the diagnostic shield module (DSM), a removable cassette that contains the diagnostic in-vessel components. It is foreseen that the DSM is a replaceable component – the procedure of which is to be performed inside the ITER hot cell facility (HCF), where the GUPP can be oriented in a vertical position. The DSM removal procedure in the HCF consists of removing locking pins, an M30 sized shoulder bolt and two electrical straps through the use of a dexterous manipulator, after which the DSM is lifted out of the GUPP by an overhead crane. For optimum access to its internals, the DSM is mounted in a handling device. The insertion of a new or refurbished DSM follows the reverse procedure. The RHCA shows that the GUPP design requires a moderate amount of changes to become fully compatible with RH maintenance requirements.

  11. The remote handling compatibility analysis of the ITER generic upper port plug structure

    International Nuclear Information System (INIS)

    Ronden, D.M.S.; Dammann, A.; Elzendoorn, B.; Giacomin, T.; Heemskerk, C.; Loesser, D.; Maquet, P.; Oosterhout, J. van; Pak, S.; Pitcher, C.S.; Portales, M.; Proust, M.; Udintsev, V.S.; Walsh, M.J.

    2014-01-01

    Highlights: • We describe the remote handling compatibility of the ITER generic upper port plug. • Concepts are presented of specific design solutions to improve RH compatibility. • Simulation in VR of the GUPP DSM replacement indicates possible collisions. • Specific tooling concepts are proposed for GUPP handling equipment for the hot cell. - Abstract: The ITER diagnostics generic upper port plug (GUPP) is developed as a standardized design for all diagnostic upper port plugs, in which a variety of payloads can be mounted. Here, the remote handling compatibility analysis (RHCA) of the GUPP design is presented that was performed for the GUPP final design review. The analysis focuses mainly on the insertion and extraction procedure of the diagnostic shield module (DSM), a removable cassette that contains the diagnostic in-vessel components. It is foreseen that the DSM is a replaceable component – the procedure of which is to be performed inside the ITER hot cell facility (HCF), where the GUPP can be oriented in a vertical position. The DSM removal procedure in the HCF consists of removing locking pins, an M30 sized shoulder bolt and two electrical straps through the use of a dexterous manipulator, after which the DSM is lifted out of the GUPP by an overhead crane. For optimum access to its internals, the DSM is mounted in a handling device. The insertion of a new or refurbished DSM follows the reverse procedure. The RHCA shows that the GUPP design requires a moderate amount of changes to become fully compatible with RH maintenance requirements

  12. Failure of a yoke body pin of a remote handling device

    International Nuclear Information System (INIS)

    Kasiviswanathan, K.V.; Muralidharan, N.G.; Raj, B.

    1984-01-01

    This note analyses the cause of failure observed in a yoke body pin of a remote handling device (Master Slave Manipulator) used for handling highly radioactive materials, remotely in shielded enclosures. The yoke body constitutes an important part of the manipulator wrist assembly and was made out of AISI 420 grade steel as a single piece investment casting. (orig./IHOE) [de

  13. Applying HAZOP analysis in assessing remote handling compatibility of ITER port plugs

    NARCIS (Netherlands)

    Duisings, L. P. M.; van Til, S.; Magielsen, A. J.; Ronden, D. M. S.; Elzendoorn, B. S. Q.; Heemskerk, C. J. M.

    2013-01-01

    This paper describes the application of a Hazard and Operability Analysis (HAZOP) methodology in assessing the criticality of remote handling maintenance activities on port plugs in the ITER Hot Cell facility. As part of the ECHUL consortium, the remote handling team at the DIFFER Institute is

  14. Protecting worker health and safety using remote handling systems

    International Nuclear Information System (INIS)

    Dennison, D.K.; Merrill, R.D.; Reed, R.K.

    1995-03-01

    Lawrence Livermore National Laboratory (LLNL) is currently developing and installing two large-scale, remotely controlled systems for use in improving worker health and safety by minimizing exposure to hazardous and radioactive materials. The first system is a full-scale liquid feed system for use in delivering chemical reagents to LLNL's existing aqueous low-level radioactive and mixed waste treatment facility (Tank Farm). The Tank Farm facility is used to remove radioactive and toxic materials in aqueous wastes prior to discharge to the City of Livermore Water Reclamation Plant (LWRP), in accordance with established discharge limits. Installation of this new reagent feed system improves operational safety and process efficiency by eliminating the need to manually handle reagents used in the treatment processes. This was done by installing a system that can inject precisely metered amounts of various reagents into the treatment tanks and can be controlled either remotely or locally via a programmable logic controller (PLC). The second system uses a robotic manipulator to remotely handle, characterize, process, sort, and repackage hazardous wastes containing tritium. This system uses an IBM-developed gantry robot mounted within a special glove box enclosure designed to isolate tritiated wastes from system operators and minimize the potential for release of tritium to the atmosphere. Tritiated waste handling is performed remotely, using the robot in a teleoperational mode for one-of-a-kind functions and in an autonomous mode for repetitive operations. The system is compatible with an existing portable gas cleanup unit designed to capture any gas-phase tritium inadvertently released into the glove box during waste handling

  15. The development of remote repairing system, decontamination and in-cell remote inspection equipment

    International Nuclear Information System (INIS)

    Ishibashi, Yuzo; Toyoda, Osamu; Haginoya, Isao; Yamamoto, Ryuichi; Tanaka, Yasumasa

    1993-01-01

    PNC has been developing remote repair and inspection technologies for in-cell components in reprocessing Plants. In this report, several remote technologies such as remote dismantling and removal, decontamination, remote pipe maintenance and remote in-cell inspection equipment are described. (author)

  16. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  17. Mission Need Statement for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego

    2009-06-01

    The Idaho National Laboratory proposes to establish replacement remote-handled low-level waste disposal capability to meet Nuclear Energy and Naval Reactors mission-critical, remote-handled low-level waste disposal needs beyond planned cessation of existing disposal capability at the end of Fiscal Year 2015. Remote-handled low-level waste is generated from nuclear programs conducted at the Idaho National Laboratory, including spent nuclear fuel handling and operations at the Naval Reactors Facility and operations at the Advanced Test Reactor. Remote-handled low-level waste also will be generated by new programs and from segregation and treatment (as necessary) of remote-handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex. Replacement disposal capability must be in place by Fiscal Year 2016 to support uninterrupted Idaho operations. This mission need statement provides the basis for the laboratory’s recommendation to the Department of Energy to proceed with establishing the replacement remote-handled low-level waste disposal capability, project assumptions and constraints, and preliminary cost and schedule information for developing the proposed capability. Without continued remote-handled low-level waste disposal capability, Department of Energy missions at the Idaho National Laboratory would be jeopardized, including operations at the Naval Reactors Facility that are critical to effective execution of the Naval Nuclear Propulsion Program and national security. Remote-handled low-level waste disposal capability is also critical to the Department of Energy’s ability to meet obligations with the State of Idaho.

  18. SNS Target Test Facility for remote handling design and verification

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Graves, V.B.; Schrock, S.L.

    1998-01-01

    The Target Test Facility will be a full-scale prototype of the Spallation Neutron Source Target Station. It will be used to demonstrate remote handling operations on various components of the mercury flow loop and for thermal/hydraulic testing. This paper describes the remote handling aspects of the Target Test Facility. Since the facility will contain approximately 1 cubic meter of mercury for the thermal/hydraulic tests, an enclosure will also be constructed that matches the actual Target Test Cell

  19. Improvements in remote equipment torquing and fastening

    International Nuclear Information System (INIS)

    Garin, J.

    1978-01-01

    Remote torquing and fastening is a requirement of generic interest for application in an environment not readily accessible to man. The developments over the last 30 years in torque-controlled equipment above 200 nm (150 ft/lb) have not been emphasized. The development of specialized subassemblies to torque and fasten equipment in a remotely controlled environment is an integral part of the Advanced Fuel Recycle Program at Oak Ridge National Laboratory. Commercially available subassemblies have been adapted into a system that would provide remote torquing and fastening in the range of 200 to 750 nm (150 to 550 ft/lb). 9 figures

  20. Examples of remote handling of irradiated fuel assemblies in Germany

    International Nuclear Information System (INIS)

    Peehs, M.; Knecht, K.

    1999-01-01

    Examples for the remote handling of irradiated fuel in Germany are presented in the following areas: - fuel assembling pool service activities; - early encapsulation of spent fuel in the pool of a nuclear power plant (NPP) at the end of the wet storage period. All development in remote fuel assembly handling envisages minimization of the radioactive dose applied to the operating staff. In the service area a further key objective for applying advanced methods is to perform the work faster and at a higher quality standard. The early encapsulation is a new technology to provide the final packaging of spent fuel already in the pool of a NPP to ensure reliable handling for all further back end processes. (author)

  1. Hot Laboratories and Remote Handling

    International Nuclear Information System (INIS)

    2007-01-01

    The Opening talk of the workshop 'Hot Laboratories and Remote Handling' was given by Marin Ciocanescu with the communication 'Overview of R and D Program in Romanian Institute for Nuclear Research'. The works of the meeting were structured into three sections addressing the following items: Session 1. Hot cell facilities: Infrastructure, Refurbishment, Decommissioning; Session 2. Waste, transport, safety and remote handling issues; Session 3. Post-Irradiation examination techniques. In the frame of Section 1 the communication 'Overview of hot cell facilities in South Africa' by Wouter Klopper, Willie van Greunen et al, was presented. In the framework of the second session there were given the following four communications: 'The irradiated elements cell at PHENIX' by Laurent Breton et al., 'Development of remote equipment for DUPIC fuel fabrication at KAERI', by Jung Won Lee et al., 'Aspects of working with manipulators and small samples in an αβγ-box, by Robert Zubler et al., and 'The GIOCONDA experience of the Joint Research Centre Ispra: analysis of the experimental assemblies finalized to their safe recovery and dismantling', by Roberto Covini. Finally, in the framework of the third section the following five communications were presented: 'PIE of a CANDU fuel element irradiated for a load following test in the INR TRIGA reactor' by Marcel Parvan et al., 'Adaptation of the pole figure measurement to the irradiated items from zirconium alloys' by Yury Goncharenko et al., 'Fuel rod profilometry with a laser scan micrometer' by Daniel Kuster et al., 'Raman spectroscopy, a new facility at LECI laboratory to investigate neutron damage in irradiated materials' by Lionel Gosmain et al., and 'Analysis of complex nuclear materials with the PSI shielded analytical instruments' by Didier Gavillet. In addition, eleven more presentations were given as posters. Their titles were: 'Presentation of CETAMA activities (CEA analytic group)' by Alain Hanssens et al. 'Analysis of

  2. Remote handling concept for the neutral beam system

    International Nuclear Information System (INIS)

    Choi, Chang-Hwan; Palmer, Jim; Conesa, Carles; Friconneau, Jean-Pierre; Martins, Jean-Pierre; Subramanian, Rajendran; Jeannoutot, Thomas; Graceffa, Joseph; Schunke, Beatrix; Uffelen, MarcoVan; Damiani, Carlo; Tesini, Alessandro

    2011-01-01

    The NB ITER Remote Maintenance System (NB IRMS) provides the means for the remote maintenance within the NB Cell by removal and replacement of the plant equipment. The NB IRMS will be installed and removed with the assistance of human workers during the preparation, and post-operation phase. During the maintenance operation after opening the Passive Magnetic Shield (PMS) and vessels, the maintenance activity and recovery from failure should be conducted remotely. This paper describes the concept design of the NB IRMS operating inside the NB cell for maintenance of the plant equipment such as NB components, and Upper Port Plugs (UPP). The main tasks of the IRMS, the description of the sub-systems and their specification, and deployment/operation principles are presented. The transportation concept of the NB IRMS to the hot cell facility for storage and maintenance is presented, which is to avoid unnecessary exposure on the equipment inside the NB cell during the machine operation.

  3. Combined application of Product Lifecycle and Software Configuration Management systems for ITER remote handling

    International Nuclear Information System (INIS)

    Muhammad, Ali; Esque, Salvador; Aha, Liisa; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti; Jaervenpaeae, Jorma; Irving, Mike; Damiani, Carlo; Semeraro, Luigi

    2009-01-01

    The advantages of Product Lifecycle Management (PLM) systems are widely understood among the industry and hence a PLM system is already in use by International Thermonuclear Experimental Reactor (ITER) Organization (IO). However, with the increasing involvement of software in the development, the role of Software Configuration Management (SCM) systems have become equally important. The SCM systems can be useful to meet the higher demands on Safety Engineering (SE), Quality Assurance (QA), Validation and Verification (V and V) and Requirements Management (RM) of the developed software tools. In an experimental environment, such as ITER, the new remote handling requirements emerge frequently. This means the development of new tools or the modification of existing tools and the development of new remote handling procedures or the modification of existing remote handling procedures. PLM and SCM systems together can be of great advantage in the development and maintenance of such remote handling system. In this paper, we discuss how PLM and SCM systems can be integrated together and play their role during the development and maintenance of ITER remote handling system. We discuss the possibility to investigate such setup at DTP2 (Divertor Test Platform 2), which is the full scale mock-up facility to verify the ITER divertor remote handling and maintenance concepts.

  4. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  5. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  6. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  7. Remote handling installation of diagnostics in the JET Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Allan, P., E-mail: Peter.Allan@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Loving, A.B. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Omran, H. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom); Collins, S.; Thomas, J. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Parsloe, A.; Merrigan, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); British Nuclear Services, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Hassall, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom)

    2011-10-15

    The requirement for an upgrade of the diagnostics for the JET ITER Like Wall (ILW) while maintaining personnel exposure to contamination as low as reasonably practicable or ALARP, has necessitated the development of a bespoke set of diagnostic components. These components, by virtue of their design and location, require a versatile yet comprehensive suite of remote handling tools to undertake their in-vessel installation. The installation of the various diagnostic components is covered in multiple tasks. Each task requires careful assessment and design of tools that can successfully interface with the components and comply with the handling and installation requirements. With remote maintenance a requirement, the looms/conduits were designed to be modular with connections which are electrically connected when the module is fitted or conversely disconnected when removed. The shape of each complex and often bulky component is verified during the design phase, to ensure that it can be delivered and installed to its specified location in the torus. This is done by matching the kinematic capabilities of the remote handling system and the path of the component through the torus by using a state of the art virtual reality system.

  8. Remote handling of the blanket segments: testing of 1/3 scale mock-ups at the Robertino facility

    International Nuclear Information System (INIS)

    Maisonnier, D.; Amelotti, F.; Chiasera, A.; Gaggini, P.; Damiani, C.; Degli Esposti, L.; Gatti, G.; Castillo, E.; Caravati, D.; Farfalletti-Casali, F.; Gritzmann, P.; Ruiz, E.

    1995-01-01

    The remote replacement of blanket segments inside the vacuum vessel of a fusion reactor is probably the most complex task from the maintenance standpoint. Its success will rely on the definition of appropriate handling concepts and equipment, but also on a ''maintenance friendly'' reactor layout and blanket design. The key difficulty is the lack of rigidity of the segments which results in considerable deformations since they cannot be gripped above their centre of gravity. These deformations may be up to five times greater than the assembly clearance and one order of magnitude larger than the required positioning accuracy. Experimental activities have been undertaken to select appropriate handling devices and procedures, to assess the design of the components handled, and to review specific technical issues such as kinematics and dynamics performance, trajectory planning and control and sensors requirement for the handling devices. Work was performed in the Robertino facility where two handling concepts have been tested at a 1/3 scale. (orig.)

  9. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Queral, V., E-mail: vicentemanuel.queral@ciemat.es [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Urbon, J. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Garcia, A.; Cuarental, I.; Mota, F. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Micciche, G. [CR ENEA Brasimone, I-40035 Camugnano (BO) (Italy); Ibarra, A. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Rapisarda, D. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Casal, N. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain)

    2011-10-15

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  10. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    International Nuclear Information System (INIS)

    Queral, V.; Urbon, J.; Garcia, A.; Cuarental, I.; Mota, F.; Micciche, G.; Ibarra, A.; Rapisarda, D.; Casal, N.

    2011-01-01

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  11. Remote-automation of nuclear power plant equipment inspection and maintenance

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi; Kawamura, Hironobu; Nakano, Yoshiyuki; Izumi, Shigeru.

    1984-01-01

    The remotely operated automation of the checkup and maintenance of nuclear power generation facilities has largely contributed to the rise of capacity ratio of plants due to the shortening of regular inspection period and to the reduction of radiation exposure dose during working, the labor saving in working and so on. In this paper, the new technologies adopted in an automatic fuel exchanger, a remotely operated automatic CRD exchanger, a new type channel handling machine, pressure-withstanding main steam line plugs and so on for No.2 plant in the Fukushima No.2 Nuclear Power Station, Tokyo Electric Power Co., Inc., are reported. Besides, the state of development of new remotely operated automatic machines for nuclear power use, such as CRD disassembling and cleaning device, volume reduction equipment for spent fuel channel boxes and control rods, multi-functional robots for use under high radiation and so on is described. Also the trend of development of latest robot technology which will be put in practical use in near future is outlined, such as a running manipulator for checkup and inspection, a variable form crawler vehicle and a five-leg movable manipulator. (Kako, I.)

  12. Recent advances in remote handling at LAMPF

    International Nuclear Information System (INIS)

    Lambert, J.E.; Grisham, D.L.

    1985-01-01

    The Clinton P. Anderson Meson Physics Facility (LAMPF) has operated at beam currents above 200 microamperes since 1976. As a result, the main experimental beam line (Line A) has become increasingly radioactive over the years. Since 1976 the radiation levels have steadily increased from 100 mR/hr to levels that exceed 10,000 R/hr in the components near the pion production targets. During this time the LAMPF remote handling system, Monitor, has continued to operate successfully in the ever-increasing radiation levels, as well as with more complex remote-handling situations. This paper briefly describes the evolution of Monitor and specifically describes the complete rebuild of the A-6 target area, which is designated as the beam stop, but also includes isotope production capabilities and a primitive neutron irradiation facility. The new facility includes not only the beam stop and isotope production, but also facilities for proton irradiation and a ten-fold expansion in neutron irradiation facilities

  13. Siting Study for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; Joan Connolly; Lance Peterson; Brennon Orr; Bob Starr

    2010-10-01

    The U.S. Department of Energy has identified a mission need for continued disposal capacity for remote-handled low-level waste (LLW) generated at the Idaho National Laboratory (INL). An alternatives analysis that was conducted to evaluate strategies to achieve this mission need identified two broad options for disposal of INL generated remote-handled LLW: (1) offsite disposal and (2) onsite disposal. The purpose of this study is to identify candidate sites or locations within INL boundaries for the alternative of an onsite remote handled LLW disposal facility and recommend the highest-ranked locations for consideration in the National Environmental Policy Act process. The study implements an evaluation based on consideration of five key elements: (1) regulations, (2) key assumptions, (3) conceptual design, (4) facility performance, and (5) previous INL siting study criteria, and uses a five-step process to identify, screen, evaluate, score, and rank 34 separate sites located across INL. The result of the evaluation is identification of two recommended alternative locations for siting an onsite remote-handled LLW disposal facility. The two alternative locations that best meet the evaluation criteria are (1) near the Advanced Test Reactor Complex and (2) west of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act Disposal Facility.

  14. Virtual analysis of the remote operation of the ACP

    International Nuclear Information System (INIS)

    Yoon, Ji Sup; Kim, Sung Hyun; Song, Tai Gil; Lim, Kwang Mook

    2005-01-01

    The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance method needs to be provided. To provide such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in a computer, not in a real environment. In this way the graphic simulator and substantially reduce the design cost of the remote operation process and the equipment. Also it can provide new operation concept that is more reliable, easier to implement, and easier to understand

  15. Torus sector handling system

    International Nuclear Information System (INIS)

    Grisham, D.L.

    1981-01-01

    A remote handling system is proposed for moving a torus sector of the accelerator from under the cryostat to a point where it can be handled by a crane and for the reverse process for a new sector. Equipment recommendations are presented, as well as possible alignment schemes. Some general comments about future remote-handling methods and the present capabilities of existing systems will also be included. The specific task to be addressed is the removal and replacement of a 425 to 450 ton torus sector. This requires a horizontal movement of approx. 10 m from a normal operating position to a point where its further transport can be accomplished by more conventional means (crane or floor transporter). The same horizontal movement is required for reinstallation, but a positional tolerance of 2 cm is required to allow reasonable fit-up for the vacuum seal from the radial frames to the torus sector. Since the sectors are not only heavy but rather tall and narrow, the transport system must provide a safe, stable, and repeatable method fo sector movement. This limited study indicates that the LAMPF-based method of transporting torus sectors offers a proven method of moving heavy items. In addition, the present state of the art in remote equipment is adequate for FED maintenance

  16. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology to carry out maintenance operations on auxiliary machine components. These operations consist of removing and repairing components such as diagnostics and radio frequency (rf) heating modules using remotely operated maintenance equipment. The major equipment that is being developed to accomplish maintenance external to the plasma chamber includes the bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid rad-waste handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design have been addressed in fiscal year (FY) 1987. These included conceptual designs of manipulator systems, the start of a remote equipment research and development (R and D) program, and definition of the hot cell, decon, and equipment repair facility requirements. The manipulator work included investigating transporters and viewing/lighting subsystems. In each case, existing commercial units are being assessed initially, along with viable alternative approaches. R and D work also included demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development Facility

  17. Advantage of redundancy in the controllability of remote handling manipulator

    International Nuclear Information System (INIS)

    Muhammad, Ali; Mattila, Jouni; Vilenius, Matti; Siuko, Mikko; Semeraro, Luigi

    2011-01-01

    To carry out a variety of remote handling operations inside the ITER divertor a Water Hydraulic MANipulator (WHMAN) and its control system have been designed and developed at Tampere University of Technology. The manipulator is installed on top of Cassette Multifunctional Mover (CMM) to assist during the cassette removal and installation operations. While CMM is designed to carry heavy components such as cassettes through the service ducts relying on positioning accuracy and repeatability, WHMAN is designed to execute a mix of remote handling operations using position trajectories and master-slave telemanipulation. WHMAN is composed of eight joints: six rotational and two translational. Since a manipulator requires only six joints to acquire the desired position and orientation in operational-space, the two additional joints of WHMAN provide the redundant degrees of mobility. This paper presents how this redundancy of WHMAN can be an advantage to optimize the execution of remote handling tasks. The paper also discusses an effective way to practically exploit the redundancy. The results show that the additional degrees of freedom can be utilized to improve the dynamic behavior of the manipulator.

  18. Experience of remote under water handling operations at Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Agarwal, S.K.

    1990-01-01

    Each Refuelling outage of Tarapur Atomic Power Station Reactors involves a great deal of remote underwater handling operations using special remote handling tools, working deep down in the reactor vessel under about sixty feet of water and in the narrow confines of highly radioactive core. The remote underwater handling operations include incore and out of core sipping operations, fuel reloading or shuffling, uncoupling of control rod drives, replacement and shuffling of control blades, replacement of local power range monitors, spent fuel shipment in casks, retrieval of fallen or displaced fuel top guide spacers, orifices and their installation, underwater CCTV inspection of reactor internals, core verification, channelling and dechannelling of fuel bundles, inspection of fuel bundles and channels, unbolting and removal of old racks, installation of high density racks, removal and reinstallation of fuel support plugs and guide tubes, underwater cutting of irradiated hardware material and their disposal, fuel reconstitution, removal and reinstallation of system dryer separator etc.. The paper describes in brief the salient experience of remote underwater handling operations at TAPS especially the unusual problems faced and solved, by using special tools, employing specific techniques and by repeated efforts, patience, ingenuity and skills. (author). 10 figs

  19. Robotics and remote handling concepts for disposal of high-level nuclear waste

    International Nuclear Information System (INIS)

    McAffee, Douglas; Raczka, Norman; Schwartztrauber, Keith

    1997-01-01

    This paper summarizes preliminary remote handling and robotic concepts being developed as part of the US Department of Energy's (DOE) Yucca Mountain Project. The DOE is currently evaluating the Yucca Mountain Nevada site for suitability as a possible underground geologic repository for the disposal of high level nuclear waste. The current advanced conceptual design calls for the disposal of more than 12,000 high level nuclear waste packages within a 225 km underground network of tunnels and emplacement drifts. Many of the waste packages may weigh as much as 66 tonnes and measure 1.8 m in diameter and 5.6 m long. The waste packages will emit significant levels of radiation and heat. Therefore, remote handling is a cornerstone of the repository design and operating concepts. This paper discusses potential applications areas for robotics and remote handling technologies within the subsurface repository. It also summarizes the findings of a preliminary technology survey which reviewed available robotic and remote handling technologies developed within the nuclear, mining, rail and industrial robotics and automation industries, and at national laboratories, universities, and related research institutions and government agencies

  20. Remote Handling behind port plug in ITER

    International Nuclear Information System (INIS)

    Bede, O.; Neuberger, H.

    2006-01-01

    Different Test Blanket Modules (TBM) will be used in succession in the same equatorial ports of ITER. The remote handling operations for connection/disconnection of an interface between the port plug of the EU-HCPB-TBM and the port cell equipment are investigated with the goal to reach a quick and simple TBM exchange procedure. This paper describes the operations and systems which are required for connection of the TBM to its supply lines at this interface. The interface is located inside the free space of the port plug flange between the port plug shield and the bioshield of the port cell behind. The approach of the operation place is only available through a narrow gate in the bioshield opened temporarily during maintenance periods. This gate limits the dimensions of the whole system and its tools. The current design of the EU-HCPB-TBM foresees up to 9 supply lines which have to be connected inside the free space of one half of the port plug flange. The connection operations require positioning and adjustment of the tools for each pipe separately. Despite the strict circumstances it is still possible to find such an industrial jointed-arm robot with sufficient payload, which can penetrate into the working area. A mechanical system is necessary to move the robot from its storing place in the hot cell to the port plug on 6 m distance. Each operation requires different end-of-arm tools. The most special one is a pipe positioner tool, which can position and pull the pipe ends to each other and align the tool before welding and hold them in proper position during the welding process. Weld seams can be made by orbital welding tool. The pipe positioner tool has to provide place for welding tool. Using of inbore tool is impossible because pipes have no open ends where the tool could leave it. Orbital tool must be modified to meet requirements of remote handling because it is designed for human handling. The coolant is helium, so for eliminating the leak of helium it is

  1. Robot vision system R and D for ITER blanket remote-handling system

    International Nuclear Information System (INIS)

    Maruyama, Takahito; Aburadani, Atsushi; Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Tesini, Alessandro

    2014-01-01

    For regular maintenance of the International Thermonuclear Experimental Reactor (ITER), a system called the ITER blanket remote-handling system is necessary to remotely handle the blanket modules because of the high levels of gamma radiation. Modules will be handled by robotic power manipulators and they must have a non-contact-sensing system for installing and grasping to avoid contact with other modules. A robot vision system that uses cameras was adopted for this non-contact-sensing system. Experiments for grasping modules were carried out in a dark room to simulate the environment inside the vacuum vessel and the robot vision system's measurement errors were studied. As a result, the accuracy of the manipulator's movements was within 2.01 mm and 0.31°, which satisfies the system requirements. Therefore, it was concluded that this robot vision system is suitable for the non-contact-sensing system of the ITER blanket remote-handling system

  2. Robot vision system R and D for ITER blanket remote-handling system

    Energy Technology Data Exchange (ETDEWEB)

    Maruyama, Takahito, E-mail: maruyama.takahito@jaea.go.jp [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan); Aburadani, Atsushi; Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka [Japan Atomic Energy Agency, Fusion Research and Development Directorate, Naka, Ibaraki-ken 311-0193 (Japan); Tesini, Alessandro [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul Lez Durance (France)

    2014-10-15

    For regular maintenance of the International Thermonuclear Experimental Reactor (ITER), a system called the ITER blanket remote-handling system is necessary to remotely handle the blanket modules because of the high levels of gamma radiation. Modules will be handled by robotic power manipulators and they must have a non-contact-sensing system for installing and grasping to avoid contact with other modules. A robot vision system that uses cameras was adopted for this non-contact-sensing system. Experiments for grasping modules were carried out in a dark room to simulate the environment inside the vacuum vessel and the robot vision system's measurement errors were studied. As a result, the accuracy of the manipulator's movements was within 2.01 mm and 0.31°, which satisfies the system requirements. Therefore, it was concluded that this robot vision system is suitable for the non-contact-sensing system of the ITER blanket remote-handling system.

  3. Progress in control equipment for fuel-handling machinery

    International Nuclear Information System (INIS)

    Nutting, B.A.

    1986-01-01

    The paper outlines the development of the equipment used to control the fuel-handling machinery associated with nuclear reactors, from the early electromechanical equipment, through solid-state switching logic to programmable controllers and microprocessors. The control techniques have developed along with the technology, and modern systems offer versatility, reliability and ease of design, operation and maintenance. Future trends and developments are discussed together with possible limiting factors. (author)

  4. Remote handling procedures in JET

    International Nuclear Information System (INIS)

    Raimondi, T.; Huguet, M.

    1976-01-01

    Remote maintenance will be needed in the second phase of operation due to the structural activation produced by deuterium-tritium discharges. Priority will be given to tasks which require frequent intervention, but efforts will be made also to tackle larger operations such as replacement of an octant. Owing to the variety and unpredictability of the operations which may be required, general purpose telemanipulator and TV systems will be used, mounted on versatile articulated supports capable of reaching the various parts of the machine. An experimental programme is planned to test the envisaged equipment and develop procedures for carrying out the various tasks as they are more clearly identified. Design of peripheral equipment for easy accessibility, choice of simple connection methods, development of auxiliary tools, as well as careful programming of the operations, will be essential for successful remote maintenance. The effort put into these areas will, however, also result in considerable time saving during the assembly and maintenance in non-active conditions. Preliminary feasibility tests of some difficult operations have already been done with a force-reflecting servo-manipulator and two TV sets for front and side viewing. Leak identification and precision welding for vacuum tightness were demonstrated

  5. Means for attaching remote handling tongs

    International Nuclear Information System (INIS)

    Kearney, A.S.

    1982-01-01

    A remote handling tong has a replaceable slave head assembly provided with a spring biased latch which engages a recess in a barrel member of the tong. The latch bolt extends transverse to the barrel member, and has studs which project at each end beyond the body of the slave head assembly so as to engage respective linear cam surfaces at a station for parking the slave head assembly. (author)

  6. Performance Evaluation and Suggestion of Upgraded Fuel Handling Equipment for Operating OPR1000

    International Nuclear Information System (INIS)

    Chang, Sang Gyoon; Hwang, Jeung Ki; Choi, Taek Sang; Na, Eun Seok; Lee, Myung Lyul; Baek, Seung Jin; Kim, Man Su; Kunik, Jack

    2011-01-01

    The purpose of this study is to evaluate the performance of upgraded FHE (Fuel Handling Equipment) for operating OPR 1000 (Optimized Power Reactor) by using data measured during the fuel reloading, and make some suggestions on enhancing the performance of the FHE. The fuel handling equipment, which serves critical processes in the refueling outage, has been upgraded to increase and improve the operational availability of the plant. The evaluation and suggestion of this study can be a beneficial tool related to the performance of the fuel handling equipment

  7. Evaluation of the revised electrolytic reduction reactor from a remote operability aspect

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyo Jik; Yoon, K. H.; Kim, K. H. (and others)

    2008-01-15

    This report presents an evaluation of the remote operability of the revised electrolytic reduction (ER) reactor installed in the ACP at KAERI. All operations have to be implemented in a fully remote manner since the ACPF is a hotcell for handling highly radioactive materials such as spent nuclear fuels. In particular, the ER process is a key process of the Advanced spent fuel Conditioning Process (ACP) and it needs a lot of other auxiliary equipment to perform it. Also, since the ER equipment is too big and complicated, and contrarily the ACPF is not big enough, and one common rail is allotted for a bridge transported servo manipulator, an in-cell crane and a gate crane, a remote handling of the ER reactor is accompanied by a difficulty for a remote operation. For an easy understanding, short overview of the ER process, the remote handling equipment, the structural configuration of the ACPF and the detail drawings of the ER equipment are presented. Through 4 month-remote operational tests, detailed operational procedures are presented along with pictures. The remote handling equipment and tools required in each operation are addressed in detail. Also, the procedure to implement each remote operation, and a task difficulty are evaluated from a remote operability aspect. All the remote tasks are distinguished according to whether a remote operation can be performed or not. Finally, partial improvement or an idea to solve the suggested problems is presented. This report will assist in modifying or scaling up the ER reactor.

  8. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, Bernhard

    2008-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper

  9. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, B.

    2007-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development - Remote handling task logistics and resource management - Command, control and human-machine interface system - Viewing and camera systems - Virtual Reality and Augmented Reality software - Automatic path planning and collision avoidance - Remote transfer of heavy loads - Maintainability of RH Equipment - Reliability, redundant systems and safety - Rationalisation and modularity in both hardware and software - Recovery from failure modes - Condition monitoring and fault detection/prediction - Ability to deal with unforeseen problems Oxford Technologies Ltd has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET Remote Handling experience and the ITER Hot Cell design and layout are given throughout this paper. (orig.)

  10. Setting up and managing a remote maintenance operation for fusion

    Energy Technology Data Exchange (ETDEWEB)

    Haist, Bernhard [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon OX14 1RJ (United Kingdom)], E-mail: Bernhard.Haist@oxfordtechnologies.co.uk

    2008-12-15

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper.

  11. TPX in-vessel remote maintenance tooling

    International Nuclear Information System (INIS)

    Rennich, M.J.; Silke, G.W.

    1995-01-01

    The Tokamak Physics Experiment (TPX) has used the lessons learned from successful remote maintenance and remote handling facilities to develop both a concept and philosophy for incorporation of remote design from the earliest phases of the project. Initiation of mockup testing during the conceptual design phase leads to significant improvements in the basic maintenance equipment configuration. In addition, remote handling features and capabilities have been incorporated into the design of the plasma-facing components (PFCs) as part of the total PFC design effort

  12. Automatic refueling platform and CRD remote handling device for BWR plant

    International Nuclear Information System (INIS)

    Kato, Hiroaki; Takagi, Kaoru

    1978-01-01

    In BWR plants, machines for replacing fuel assemblies and control rod drives are usually operated directly by personnel. An automatic refueling platform and a CRD remote handling device aiming at radiation exposure reduction and handling perfectness are described, which are already used in BWR plants. Automation of the former is achieved in transporting fuel assemblies between a reactor pressure vessel and a fuel storage pool, shuffling fuel assemblies in a reactor core and moving fuel assemblies in a fuel storage pool. In the latter, replacement of CRDs is nearly all performed remotely. (Mori, K.)

  13. Survey of technology for decommissioning of nuclear fuel cycle facilities. 8. Remote handling and cutting techniques

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, Ryuichiro; Ishijima, Noboru [Japan Nuclear Cycle Development Inst., Oarai, Ibaraki (Japan). Oarai Engineering Center

    1999-03-01

    In nuclear fuel cycle facility decommissioning and refurbishment, the remote handling techniques such as dismantling, waste handling and decontamination are needed to reduce personnel radiation exposure. The survey research for the status of R and D activities on remote handling tools suitable for nuclear facilities in the world and domestic existing commercial cutting tools applicable to decommissioning of the facilities was conducted. In addition, the drive mechanism, sensing element and control system applicable to the remote handling devices were also surveyed. This report presents brief surveyed summaries. (H. Itami)

  14. Development of remote handling system based on 3-D shape recognition technique

    International Nuclear Information System (INIS)

    Tomizuka, Chiaki; Takeuchi, Yutaka

    2006-01-01

    In a nuclear facility, the maintenance and repair activities must be done remotely in a radioactive environment. Fuji Electric Systems Co., Ltd. has developed a remote handling system based on 3-D recognition technique. The system recognizes the pose and position of the target to manipulate, and visualizes the scene with the target in 3-D, enabling an operator to handle it easily. This paper introduces the concept and the key features of this system. (author)

  15. Analysis of ITER upper port plug remote handling maintenance scenarios

    International Nuclear Information System (INIS)

    Koning, J.F.; Baar, M.R. de; Elzendoorn, B.S.Q.; Heemskerk, C.J.M.; Ronden, D.M.S.; Schuth, W.J.

    2012-01-01

    Highlights: ► Remote Handling Study Centre: providing RH compatibility analysis. ► Simulation: virtual reality including kinematics and realtime physics simulator. ► Applied on analysis of RH compatibility of Upper Launcher component replacement. ► Resulting in lowered maintenance procedure time and lessons learned. - Abstract: The ITER tokamak has a modular design, with port plugs, blanket modules and divertor cassettes. This set-up allows for maintenance of diagnostics, heating systems and first wall elements. The maintenance can be done in situ, or in the Hot Cell. Safe and effective remote handling (RH) will be ensured by the RH requirements and standards. Compliance is verified through remote handling compatibility assessments at the ITER Design Review milestones. The Remote Handling Study Centre at FOM Institute DIFFER is created to study ITER RH maintenance processes at different levels of complexity, from relatively simple situational awareness checks using snap-shots in the CAD system, time studies using virtual reality (VR) animations, to extensive operational sequence validation with multiple operators in real-time. The multi-operator facility mimics an RH work-cell as presently foreseen in the ITER RH control room. Novel VR technology is used to create a realistic setting in which a team of RH operators can interact with virtual ITER environments. A physics engine is used to emulate real-time contact interaction as to provide realistic haptic feed-back. Complex interactions between the RH operators and the control room system software are tested. RH task performance is quantified and operational resource usage estimated. The article provides a description and lessons learned from a recent study on replacement of the Steering Mirror Assembly on the ECRH (Electron Cyclotron Resonance Heating) Upper Launcher port plug.

  16. Analysis of ITER upper port plug remote handling maintenance scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Koning, J.F., E-mail: j.f.koning@heemskerk-innovative.nl [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Baar, M.R. de; Elzendoorn, B.S.Q. [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Ronden, D.M.S.; Schuth, W.J. [FOM Institute DIFFER - Dutch Institute for Fundamental Energy Research, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands)

    2012-08-15

    Highlights: Black-Right-Pointing-Pointer Remote Handling Study Centre: providing RH compatibility analysis. Black-Right-Pointing-Pointer Simulation: virtual reality including kinematics and realtime physics simulator. Black-Right-Pointing-Pointer Applied on analysis of RH compatibility of Upper Launcher component replacement. Black-Right-Pointing-Pointer Resulting in lowered maintenance procedure time and lessons learned. - Abstract: The ITER tokamak has a modular design, with port plugs, blanket modules and divertor cassettes. This set-up allows for maintenance of diagnostics, heating systems and first wall elements. The maintenance can be done in situ, or in the Hot Cell. Safe and effective remote handling (RH) will be ensured by the RH requirements and standards. Compliance is verified through remote handling compatibility assessments at the ITER Design Review milestones. The Remote Handling Study Centre at FOM Institute DIFFER is created to study ITER RH maintenance processes at different levels of complexity, from relatively simple situational awareness checks using snap-shots in the CAD system, time studies using virtual reality (VR) animations, to extensive operational sequence validation with multiple operators in real-time. The multi-operator facility mimics an RH work-cell as presently foreseen in the ITER RH control room. Novel VR technology is used to create a realistic setting in which a team of RH operators can interact with virtual ITER environments. A physics engine is used to emulate real-time contact interaction as to provide realistic haptic feed-back. Complex interactions between the RH operators and the control room system software are tested. RH task performance is quantified and operational resource usage estimated. The article provides a description and lessons learned from a recent study on replacement of the Steering Mirror Assembly on the ECRH (Electron Cyclotron Resonance Heating) Upper Launcher port plug.

  17. Evaluating ITER remote handling middleware concepts

    International Nuclear Information System (INIS)

    Koning, J.F.; Heemskerk, C.J.M.; Schoen, P.; Smedinga, D.; Boode, A.H.; Hamilton, D.T.

    2013-01-01

    Highlights: ► Remote Handling Study Centre: middleware system setup and modules built. ► Aligning to ITER RH Control System Layout: prototype of database, VR and simulator. ► OpenSplice DDS, ZeroC ICE messaging and object oriented middlewares reviewed. ► Windows network latency found problematic for semi-realtime control over the network. -- Abstract: Remote maintenance activities in ITER will be performed by a unique set of hardware systems, supported by an extensive software kit. A layer of middleware will manage and control a complex set of interconnections between teams of operators, hardware devices in various operating theatres, and databases managing tool and task logistics. The middleware is driven by constraints on amounts and timing of data like real-time control loops, camera images, and database access. The Remote Handling Study Centre (RHSC), located at FOM institute DIFFER, has a 4-operator work cell in an ITER relevant RH Control Room setup which connects to a virtual hot cell back-end. The centre is developing and testing flexible integration of the Control Room components, resulting in proof-of-concept tests of this middleware layer. SW components studied include generic human-machine interface software, a prototype of a RH operations management system, and a distributed virtual reality system supporting multi-screen, multi-actor, and multiple independent views. Real-time rigid body dynamics and contact interaction simulation software supports simulation of structural deformation, “augmented reality” operations and operator training. The paper presents generic requirements and conceptual design of middleware components and Operations Management System in the context of a RH Control Room work cell. The simulation software is analyzed for real-time performance and it is argued that it is critical for middleware to have complete control over the physical network to be able to guarantee bandwidth and latency to the components

  18. Evaluating ITER remote handling middleware concepts

    Energy Technology Data Exchange (ETDEWEB)

    Koning, J.F., E-mail: j.f.koning@differ.nl [FOM Institute DIFFER, Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster and ITER-NL, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M.; Schoen, P.; Smedinga, D. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Boode, A.H. [University of Applied Sciences InHolland, Alkmaar (Netherlands); Hamilton, D.T. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► Remote Handling Study Centre: middleware system setup and modules built. ► Aligning to ITER RH Control System Layout: prototype of database, VR and simulator. ► OpenSplice DDS, ZeroC ICE messaging and object oriented middlewares reviewed. ► Windows network latency found problematic for semi-realtime control over the network. -- Abstract: Remote maintenance activities in ITER will be performed by a unique set of hardware systems, supported by an extensive software kit. A layer of middleware will manage and control a complex set of interconnections between teams of operators, hardware devices in various operating theatres, and databases managing tool and task logistics. The middleware is driven by constraints on amounts and timing of data like real-time control loops, camera images, and database access. The Remote Handling Study Centre (RHSC), located at FOM institute DIFFER, has a 4-operator work cell in an ITER relevant RH Control Room setup which connects to a virtual hot cell back-end. The centre is developing and testing flexible integration of the Control Room components, resulting in proof-of-concept tests of this middleware layer. SW components studied include generic human-machine interface software, a prototype of a RH operations management system, and a distributed virtual reality system supporting multi-screen, multi-actor, and multiple independent views. Real-time rigid body dynamics and contact interaction simulation software supports simulation of structural deformation, “augmented reality” operations and operator training. The paper presents generic requirements and conceptual design of middleware components and Operations Management System in the context of a RH Control Room work cell. The simulation software is analyzed for real-time performance and it is argued that it is critical for middleware to have complete control over the physical network to be able to guarantee bandwidth and latency to the components.

  19. 77 FR 23117 - Rigging Equipment for Material Handling Construction Standard; Correction and Technical Amendment

    Science.gov (United States)

    2012-04-18

    ... Equipment for Material Handling Construction Standard; Correction and Technical Amendment AGENCY... AND HEALTH REGULATIONS FOR CONSTRUCTION Subpart H--Materials Handling, Storage, Use, and Disposal 0 1... amendment. SUMMARY: OSHA is correcting its sling standard for construction titled ``Rigging Equipment for...

  20. Factors affecting remote handling productivity during installation of the ITER-like wall at JET

    International Nuclear Information System (INIS)

    Collins, S.; Matthews, G.; Thomas, J.; Hermon, G.

    2013-01-01

    Highlights: ► The paper describes the challenges to achieve the installation of the ILW beryllium sliced wall. ► Examines the factual difference between estimated remote handling in-vessel durations and those achieved, with a view to quantifying the typical disparity between the two. ► The paper will elaborate and highlight the contributing factors. This offers an opportunity to provide provenance for availability estimates of devices such as ITER and DEMO. ► The paper will identify and describe the factors influencing the ratio between estimated versus the actual durations for remote handling operations. -- Abstract: Remote handling operations at JET have encountered many challenges to achieve the installation of the ILW beryllium sliced wall during the Enhanced Performance stage 2 (EP2) shutdown of JET. This was a demanding and challenging activity which was based on the experience gained from a period of over 15 years (20,000 h operations) of JET In-Vessel remote handling operations. This paper describes the difference between estimated remote handling in-vessel durations and those actually achieved with a view to quantifying the typical disparity between them. There are many factors that affect productivity of the remote handling operations and it is important to accommodate these either in the design of the component or within the production of the operational procedures with a view to minimise all impact on the final task duration. Some factors that affect the efficiency are outside the control of the design and operational procedures. These are unforeseen anomalies that were encountered during the removal, naked wall survey and installation of the components. Recoveries from these anomalies are extremely challenging and need to be addressed efficiently in order to minimise the impact on the shutdown duration and prevent optimised panned activities from becoming inefficient by fragmentation

  1. Remote handling experiments with the MASCOT IV servomanipulator at JET and prospects of enhancements

    International Nuclear Information System (INIS)

    Hamilton, D.; Colombi, S.; Galbiati, L.; Haist, B.; Mills, S.; Raimondi, T.

    1995-01-01

    Ongoing remote handling trials are being performed at JET, using the MASCOT IV servomanipulator, in order to establish the feasibility of proposed remote handling tasks. This promotes the development of appropriate tools and methods, the determination of time scales, and suggests modifications to be incorporated into the final design of the related JET components. (orig.)

  2. The use of virtual reality and intelligent database systems for procedure planning, visualisation, and real-time component tracking in remote handling operations

    International Nuclear Information System (INIS)

    Robbins, Edward; Sanders, Stephen; Williams, Adrian; Allan, Peter

    2009-01-01

    The organisation of remote handling (RH) operations in fusion environments is increasingly critical as the number of tasks, components and tooling that RH operations teams must deal with inexorably rises. During the recent JET EP1 RH shutdown the existing virtual reality (VR) and procedural database systems proved essential for visualisation and tracking of operations, particularly due to the increasing complexity of remote tasks. A new task planning system for RH operations is in development, and is expected to be ready for use during the next major shutdown, planned for 2009. The system will make use of information available from the remote operations procedures, the RH equipment human-machine interfaces, the on-line RH equipment control systems and also the virtual reality (VR) system to establish a complete database for the location of plant items and RH equipment as RH operations progress. It is intended that the system be used during both preparation and implementation of shutdowns. In the preparations phase the system can be used to validate procedures and overall logistics by allowing an operator to increment through each operation step and to use the VR system to visualise the location and status of all components, manipulators and RH tools. During task development the RH operations engineers can plan and visualise movement of components and tooling to examine handling concepts and establish storage requirements. In the implementation of operations the daily work schedules information will be integrated with the RH operations procedures tracking records to enable the VR system to provide a visual representation of the status of remote operations in real time. Monitoring of the usage history of items will allow estimates of radiation dosage and contaminant exposure to be made. This paper describes the overall aims, structure and use of the system, discusses its application to JET and also considers potential future developments.

  3. Remote maintenance concepts for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Davis, F.C.; Hager, E.R.

    1988-01-01

    Because deuterium-tritium fuel will be used in the Compact Ignition Tokamak (CIT), remote handling technology is needed to carry out some maintenance operations on the machine. In keeping with the compact, low-cost nature of CIT, remote maintenance is provided only for systems with the highest probability of failure. Remote operations include removing, repairing (if feasible), and replacing such components as thermal protection tiles on the first wall, radio-frequency (rf) heating modules, and diagnostic modules. For maintenance inside the vacuum vessel, major pieces of equipment under development include an articulated boom manipulator with servomanipulators, an inspection manipulator, and special tooling. For maintenance outside the cryostat, remote equipment includes a bridge-mounted manipulator system, equipment for decontamination and hot cell activities, and for handling and packaging solid radioactive waste. The conceptual design phase of the CIT project is nearing completion; research and development activities in support of the project include demonstrations of remote maintenance operations on full-size partial mock-ups. 9 figs

  4. Remotely operated top loading filter housing

    International Nuclear Information System (INIS)

    Ross, M.J.; Carter, J.A.

    1989-01-01

    A high-efficiency particulate air (HEPA) filter system was developed for the Fuel Processing Facility at the Idaho Chemical Processing Plant. The system utilizes commercially available HEPA filters and allows in-cell filters to be maintained using operator-controlled remote handling equipment. The remote handling tasks include transport of filters before and after replacement, removal and replacement of the filter from the housing, and filter containment

  5. Man/machine interface for a nuclear cask remote handling control station: system design requirements

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.; Draper, J.V.

    1984-01-01

    Design requirements are presented for a control station of a proposed semi-automated facility for remote handling of nuclear waste casks. Functional and operational man/machine interface: controls, displays, software format, station architecture, and work environment. In addition, some input is given to the design of remote sensing systems in the cask handling areas. 18 references, 9 figures, 12 tables

  6. Test of remote control cutting equipment by Nd:YAG laser

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Akio [Fuji Electric Corp. Research and Development Ltd., Yokosuka, Kanagawa (Japan); Hosoda, Hiroshi

    1997-11-01

    Technology of remote controlled cutting and reduction of generative secondary products have been required to the cutting system for decommissioning nuclear equipments. At a point of view that laser cutting technology by use of a Nd:YAG laser is effective, we have developed the laser cutting machine and carried out cutting tests for several stainless steel plates. This report is described the result of experiment by test equipment, about element technology of remote controlled cutting nuclear equipments. (author)

  7. Test of remote control cutting equipment by Nd:YAG laser

    International Nuclear Information System (INIS)

    Shimizu, Akio; Hosoda, Hiroshi.

    1997-01-01

    Technology of remote controlled cutting and reduction of generative secondary products have been required to the cutting system for decommissioning nuclear equipments. At a point of view that laser cutting technology by use of a Nd:YAG laser is effective, we have developed the laser cutting machine and carried out cutting tests for several stainless steel plates. This report is described the result of experiment by test equipment, about element technology of remote controlled cutting nuclear equipments. (author)

  8. The remote handling systems for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Isabel, E-mail: mir@isr.ist.utl.pt [Institute for Systems and Robotics/Instituto Superior Tecnico, Lisboa (Portugal); Damiani, Carlo [Fusion for Energy, Barcelona (Spain); Tesini, Alessandro [ITER Organization, Cadarache (France); Kakudate, Satoshi [ITER Tokamak Device Group, Japan Atomic Energy Agency, Ibaraki (Japan); Siuko, Mikko [VTT Systems Engineering, Tampere (Finland); Neri, Carlo [Associazione EURATOM ENEA, Frascati (Italy)

    2011-10-15

    The ITER remote handling (RH) maintenance system is a key component in ITER operation both for scheduled maintenance and for unexpected situations. It is a complex collection and integration of numerous systems, each one at its turn being the integration of diverse technologies into a coherent, space constrained, nuclearised design. This paper presents an integrated view and recent results related to the Blanket RH System, the Divertor RH System, the Transfer Cask System (TCS), the In-Vessel Viewing System, the Neutral Beam Cell RH System, the Hot Cell RH and the Multi-Purpose Deployment System.

  9. Benchmarking the Remote-Handled Waste Facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Mendiratta, O.P.; Ploetz, D.K.

    2000-01-01

    ABSTRACT Facility decontamination activities at the West Valley Demonstration Project (WVDP), the site of a former commercial nuclear spent fuel reprocessing facility near Buffalo, New York, have resulted in the removal of radioactive waste. Due to high dose and/or high contamination levels of this waste, it needs to be handled remotely for processing and repackaging into transport/disposal-ready containers. An initial conceptual design for a Remote-Handled Waste Facility (RHWF), completed in June 1998, was estimated to cost $55 million and take 11 years to process the waste. Benchmarking the RHWF with other facilities around the world, completed in November 1998, identified unique facility design features and innovative waste processing methods. Incorporation of the benchmarking effort has led to a smaller yet fully functional, $31 million facility. To distinguish it from the June 1998 version, the revised design is called the Rescoped Remote-Handled Waste Facility (RRHWF) in this topical report. The conceptual design for the RRHWF was completed in June 1999. A design-build contract was approved by the Department of Energy in September 1999

  10. Benchmarking the Remote-Handled Waste Facility at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    O. P. Mendiratta; D. K. Ploetz

    2000-02-29

    ABSTRACT Facility decontamination activities at the West Valley Demonstration Project (WVDP), the site of a former commercial nuclear spent fuel reprocessing facility near Buffalo, New York, have resulted in the removal of radioactive waste. Due to high dose and/or high contamination levels of this waste, it needs to be handled remotely for processing and repackaging into transport/disposal-ready containers. An initial conceptual design for a Remote-Handled Waste Facility (RHWF), completed in June 1998, was estimated to cost $55 million and take 11 years to process the waste. Benchmarking the RHWF with other facilities around the world, completed in November 1998, identified unique facility design features and innovative waste pro-cessing methods. Incorporation of the benchmarking effort has led to a smaller yet fully functional, $31 million facility. To distinguish it from the June 1998 version, the revised design is called the Rescoped Remote-Handled Waste Facility (RRHWF) in this topical report. The conceptual design for the RRHWF was completed in June 1999. A design-build contract was approved by the Department of Energy in September 1999.

  11. Development of spent fuel remote handling technology

    International Nuclear Information System (INIS)

    Yoon, Ji Sup; Park, B. S.; Park, Y. S.; Oh, S. C.; Kim, S. H.; Cho, M. W.; Hong, D. H.

    1997-12-01

    Since the nation's policy on spent fuel management is not finalized, the technical items commonly required for safe management and recycling of spent fuel - remote technologies of transportation, inspection, maintenance, and disassembly of spent fuel - are selected and pursued. In this regards, the following R and D activities are carried out : collision free transportation of spent fuel assembly, mechanical disassembly of spent nuclear fuel and graphical simulation of fuel handling / disassembly process. (author). 36 refs., 16 tabs., 77 figs

  12. Simulation-based design process for the verification of ITER remote handling systems

    International Nuclear Information System (INIS)

    Sibois, Romain; Määttä, Timo; Siuko, Mikko; Mattila, Jouni

    2014-01-01

    Highlights: •Verification and validation process for ITER remote handling system. •Simulation-based design process for early verification of ITER RH systems. •Design process centralized around simulation lifecycle management system. •Verification and validation roadmap for digital modelling phase. -- Abstract: The work behind this paper takes place in the EFDA's European Goal Oriented Training programme on Remote Handling (RH) “GOT-RH”. The programme aims to train engineers for activities supporting the ITER project and the long-term fusion programme. One of the projects of this programme focuses on the verification and validation (V and V) of ITER RH system requirements using digital mock-ups (DMU). The purpose of this project is to study and develop efficient approach of using DMUs in the V and V process of ITER RH system design utilizing a System Engineering (SE) framework. Complex engineering systems such as ITER facilities lead to substantial rise of cost while manufacturing the full-scale prototype. In the V and V process for ITER RH equipment, physical tests are a requirement to ensure the compliance of the system according to the required operation. Therefore it is essential to virtually verify the developed system before starting the prototype manufacturing phase. This paper gives an overview of the current trends in using digital mock-up within product design processes. It suggests a simulation-based process design centralized around a simulation lifecycle management system. The purpose of this paper is to describe possible improvements in the formalization of the ITER RH design process and V and V processes, in order to increase their cost efficiency and reliability

  13. Remote Operation and Maintenance Demonstration Facility at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1986-01-01

    The Remote Operation and Maintenance Demonstration (ROMD) Facility at the Oak Ridge National Laboratory has been developed by the Consolidated Fuel Reprocessing Program to demonstrate remote handling concepts on advanced nuclear fuel reprocessing equipment and for other programs of national interest. The ROMD facility is a large-volume high-bay area that encloses a complete, technologically advanced remote maintenance system and full-scale development reprocessing equipment. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the US Department of Energy (DOE), the Power Reactor and Nuclear Fuels Development Corporation of Japan, the US Navy, and the National Aeronautics and Space Administration. Extensive tests of manipulative systems and remote maintainability of process equipment have been performed. This paper describes the ROMD facility and key remote maintenance equipment and presents a summary of major experimental activities. 7 refs., 6 figs

  14. Management of remote-handled defense transuranic wastes

    International Nuclear Information System (INIS)

    Ebra, M.A.; Pierce, G.D.; Carson, P.H.

    1988-01-01

    Transuranic (TRU) wastes generated by defense-related activities are scheduled for emplacement at the Waste Isolation Pilot Plant (WIPP) in New Mexico beginning in October 1988. After five years of operation as a research and development facility, the WIPP may be designated as a permanent repository for these wastes, if it has been demonstrated that this deep, geologically stable formation is a safe disposal option. Defense TRU wastes are currently stored at various Department of Energy (DOE) sites across the nation. Approximately 2% by volume of currently stored TRU wastes are defined, on the basis of dose rates, as remote-handled (RH). RH wastes continue to be generated at various locations operated by DOE contractors. They require special handling and processing prior to and during emplacement in the WIPP. This paper describes the strategy for managing defense RH TRU wastes

  15. Development of spent fuel remote handling technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Ji Sup; Park, B S; Park, Y S; Oh, S C; Kim, S H; Cho, M W; Hong, D H

    1997-12-01

    Since the nation`s policy on spent fuel management is not finalized, the technical items commonly required for safe management and recycling of spent fuel - remote technologies of transportation, inspection, maintenance, and disassembly of spent fuel - are selected and pursued. In this regards, the following R and D activities are carried out : collision free transportation of spent fuel assembly, mechanical disassembly of spent nuclear fuel and graphical simulation of fuel handling / disassembly process. (author). 36 refs., 16 tabs., 77 figs

  16. Conceptual Design Report for Remote-Handled Low-Level Waste Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; David Duncan; Joan Connolly; Margaret Hinman; Charles Marcinkiewicz; Gary Mecham

    2010-10-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  17. The ITER EC H&CD Upper Launcher: Analysis of vertical Remote Handling applied to the BSM maintenance

    NARCIS (Netherlands)

    Grossetti, G.; Aiello, G.; Heemskerk, C.; Elzendoorn, B.; Geßner, R.; Koning, J.; Meier, A.; Ronden, D.; Späh, P.; Scherer, T.; Schreck, S.; Strauß, D.; Vaccaro, A.

    2013-01-01

    This paper deals with Remote Handling activities foreseen on the Blanket Shield Module, the plasma facing component of the ITER Electron Cyclotron Heating and Current Drive Upper Launcher. The maintenance configuration considered here is the Vertical Remote Handling, meaning gravity acting along the

  18. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  19. A fiber optic link for the remote handling in nuclear environment

    International Nuclear Information System (INIS)

    Breuze, G.; Carnet, B.; Friant, A.; Blanc, F.; Lordet, J.; Boisde, G.

    1988-01-01

    At CEA a R/D program is running to improve performances of servomanipulators used in nuclear fuel reprocessing plants. Present work gives the main environmental parameters (gamma rays exposition, temperature) and shows the basis of the digital link designed to remote-handle such a manipulator. Up to 10 5 Gy behavior of optical fibers and electronic components was studied. Two different optical cables were built, one for the long link (100 m), the second to set in an especially designed winding unwinding wheel. Six way permanent or remote-handle connectors were developed to connect optical interfaces and a leaktight penetration. Measured budget of the link taking into account efficient photoblesching of the pure silica core fiber and influence of gamma rays on the slave interface is presented [fr

  20. Remote handling in nuclear fusion research

    International Nuclear Information System (INIS)

    Removille, J.

    1989-01-01

    When the Joint European Torus (JET) commences operation in 1992, the neutron flux will increase by 2 or 3 orders of magnitude activating the components of the machine to such an extent as to prohibit the access of personnel into the machine hall to carry out maintenance tasks. This paper lists operations which will have to be carried out remotely either because they are essential to the routine running of the machine or in emergencies. Remotely operated equipment which has been developed to perform these tasks is described. It is based on a system of conveyors which carry manipulators and tools to their point of operation. The principal conveyors are: a telescopic articulated mast carried on a bridge over the machine enabling tasks around and above the torus to be performed; conveyors running on rails which can reach otherwise inaccessible regions beneath the machine; an articulated arm which can position a manipulator within the torus; and a radio controlled support vehicle running on caterpillar tracks carrying a camera and tools for connecting cables to other conveyors. The main features of the control room from which the conveyors, manipulators, tools and cameras are remotely operated is also described. (UK)

  1. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  2. Remote-handling demonstration tests for the Fusion Materials Irradiation Test (FMIT) Facility

    International Nuclear Information System (INIS)

    Shen, E.J.; Hussey, M.W.; Kelly, V.P.; Yount, J.A.

    1982-01-01

    The mission of the Fusion Materials Irradiation Test (FMIT) Facility is to create a fusion-like environment for fusion materials development. Crucial to the success of FMIT is the development and testing of remote handling systems required to handle materials specimens and maintenance of the facility. The use of full scale mock-ups for demonstration tests provides the means for proving these systems

  3. Three-dimensional television system for remote handling

    International Nuclear Information System (INIS)

    Dumbreck, A.A.; Abel, E.

    1988-01-01

    The paper refers to work previously described on the development of 3-D Television Systems. 3-D TV had been developed with a view to proving whether it was a useful remote handling tool which would be easy to use and comfortable to view. The paper summarizes the work of evaluation trials at UK facilities and reviews the developments which have subsequently taken place. 3-D TV systems have been found to give improved performance in terms of speed and accuracy of operations and to reduce the number of camera views required. (author)

  4. Safety handling manual for high dose rate remote afterloading system

    International Nuclear Information System (INIS)

    1999-01-01

    This manual is mainly for safety handling of 192 Ir-RALS (remote afterloading system) of high dose rate and followings were presented: Procedure and document format for the RALS therapy and for handling of its radiation source with the purpose of prevention of human errors and unexpected accidents, Procedure for preventing errors occurring in the treatment schedule and operation, and Procedure and format necessary for newly introducing the system into a facility. Consistency was intended in the description with the quality assurance guideline for therapy with small sealed radiation sources made by JASTRO (Japan Society for Therapeutic Radiology and Oncology). Use of the old type 60 Co-RALS was pointed out to be a serious problem remained and its safety handling procedure was also presented. (K.H.)

  5. Monitor: a short-cut approach to remote-handling at LAMPF

    International Nuclear Information System (INIS)

    Horne, R.A.; Ekberg, E.L.

    1975-01-01

    The monitor, constructed from relatively cheap commercial components, is a straightforward, totally remotely operated handling system intended to work on components in the LAMPF external beam line or elsewhere. It can be towed or lifted into position, then hard-wire controlled from a distance by using television. (auth)

  6. Remote automated material handling of radioactive waste containers

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-09-01

    To enhance personnel safety, improve productivity, and reduce costs, the design team incorporated a remote, automated stacker/retriever, automatic inspection, and automated guidance vehicle for material handling at the Enhanced Radioactive and Mixed Waste Storage Facility - Phase V (Phase V Storage Facility) on the Hanford Site in south-central Washington State. The Phase V Storage Facility, scheduled to begin operation in mid-1997, is the first low-cost facility of its kind to use this technology for handling drums. Since 1970, the Hanford Site's suspect transuranic (TRU) wastes and, more recently, mixed wastes (both low-level and TRU) have been accumulating in storage awaiting treatment and disposal. Currently, the Hanford Site is only capable of onsite disposal of radioactive low-level waste (LLW). Nonradioactive hazardous wastes must be shipped off site for treatment. The Waste Receiving and Processing (WRAP) facilities will provide the primary treatment capability for solid-waste storage at the Hanford Site. The Phase V Storage Facility, which accommodates 27,000 drum equivalents of contact-handled waste, will provide the following critical functions for the efficient operation of the WRAP facilities: (1) Shipping/Receiving; (2) Head Space Gas Sampling; (3) Inventory Control; (4) Storage; (5) Automated/Manual Material Handling

  7. Track-mounted remote handling system for the Tokamak Fusion Engineering Test

    International Nuclear Information System (INIS)

    Kelly, V.P.; Berger, J.D.; Daubert, R.L.; Yount, J.A.

    1982-01-01

    Concepts for remote handling machines (IVM) designed to transverse the interior of toroidal vessels with guidance and support from track systems have been developed for the proposed Tokamak Fusion Engineering Test (TFET). TFET has been proposed as an upgrade for the Tokamak Fusion Test Reactor (TFTR), currently nearing completion. The track-mounted IVMs were conceived to perform in-vessel remote maintenance for TFET, including removal and replacement of pump limiter blades and protective tiles as well as other maintenance-related tasks such as vessel wall inspection leak testing and interior cleanup. The conceptual IVMs consist of three manipulator arms mounted on a common frame member: a single power manipulator arm with high load carrying capacity and two lower-capacity servomanipulator arms. Descriptions of the IVM concepts, in-vessel track systems, and ex-vessel handling systems are presented

  8. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  9. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; David Duncan; Joan Connolly; Margaret Hinman; Charles Marcinkiewicz; Gary Mecham

    2011-03-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  10. Remote maintenance design activities and research and development accomplishments for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1988-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (rf) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance activities internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For activities external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radiation-waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. 5 figs

  11. Remote maintenance design activities and research and development accomplishments for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology in order to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (RF) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance operations internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For operations external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radioactive waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. (orig.)

  12. Classification and handling of non-conformance item of nuclear class equipment during manufacture phase

    International Nuclear Information System (INIS)

    Wang Ruiping

    2001-01-01

    Based on inspection experiences in years on nuclear class equipment manufacturing, the author discusses the classification and handling of non-conformance items occurred during equipment manufacturing, and certain technical considerations are presented

  13. 78 FR 70326 - Rigging Equipment for Material Handling; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2013-11-25

    ...] Rigging Equipment for Material Handling; Extension of the Office of Management and Budget's (OMB) Approval... on Rigging Equipment for Material Handling (29 CFR 1926.251). These paragraphs require affixing... automated or other technological information collection and transmission techniques. III. Proposed Actions...

  14. Conceptual design of the handling and storage system for spent target vessel

    Energy Technology Data Exchange (ETDEWEB)

    Adachi, Junichi; Sasaki, Shinobu; Kaminaga, Masanori; Hino, Ryutaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-03-01

    A conceptual design of a handling and storage system for spent target vessels has been carried out, in order to establish spent target technology for the neutron scattering facility. The spent target vessels must be treated remotely with high reliability and safety, since they are highly activated and contain the poisonous mercury. The system is composed of a target exchange trolley to exchange the target vessel, remote handling equipment such as manipulators, airtight casks for the spent target vessel, storage pits and so on. This report presents the results of conceptual design study on a basic plan, a handling procedure, main devices and their arrangement of a handling and storage system for the spent target vessels. (author)

  15. Structural acceptance criteria Remote Handling Building Tritium Extraction Facility

    Energy Technology Data Exchange (ETDEWEB)

    Mertz, G.

    1999-12-16

    This structural acceptance criteria contains the requirements for the structural analysis and design of the Remote Handling Building (RHB) in the Tritium Extraction Facility (TEF). The purpose of this acceptance criteria is to identify the specific criteria and methods that will ensure a structurally robust building that will safely perform its intended function and comply with the applicable Department of Energy (DOE) structural requirements.

  16. Structural acceptance criteria Remote Handling Building Tritium Extraction Facility

    International Nuclear Information System (INIS)

    Mertz, G.

    1999-01-01

    This structural acceptance criteria contains the requirements for the structural analysis and design of the Remote Handling Building (RHB) in the Tritium Extraction Facility (TEF). The purpose of this acceptance criteria is to identify the specific criteria and methods that will ensure a structurally robust building that will safely perform its intended function and comply with the applicable Department of Energy (DOE) structural requirements

  17. Harvesting and handling agricultural residues for energy

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, B.M.; Summer, H.R.

    1986-05-01

    Significant progress in understanding the needs for design of agricultural residue collection and handling systems has been made but additional research is required. Recommendations are made for research to (a) integrate residue collection and handling systems into general agricultural practices through the development of multi-use equipment and total harvest systems; (b) improve methods for routine evaluation of agricultural residue resources, possibly through remote sensing and image processing; (c) analyze biomass properties to obtain detailed data relevant to engineering design and analysis; (d) evaluate long-term environmental, social, and agronomic impacts of residue collection; (e) develop improved equipment with higher capacities to reduce residue collection and handling costs, with emphasis on optimal design of complete systems including collection, transportation, processing, storage, and utilization; and (f) produce standard forms of biomass fuels or products to enhance material handling and expand biomass markets through improved reliability and automatic control of biomass conversion and other utilization systems. 118 references.

  18. Remote-Handled Transuranic Content Codes

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions

    2006-12-01

    The Remote-Handled Transuranic (RH-TRU) Content Codes (RH-TRUCON) document describes the inventory of RH-TRU waste within the transportation parameters specified by the Remote-Handled Transuranic Waste Authorized Methods for Payload Control (RH-TRAMPAC).1 The RH-TRAMPAC defines the allowable payload for the RH-TRU 72-B. This document is a catalog of RH-TRU 72-B authorized contents by site. A content code is defined by the following components: • A two-letter site abbreviation that designates the physical location of the generated/stored waste (e.g., ID for Idaho National Laboratory [INL]). The site-specific letter designations for each of the sites are provided in Table 1. • A three-digit code that designates the physical and chemical form of the waste (e.g., content code 317 denotes TRU Metal Waste). For RH-TRU waste to be transported in the RH-TRU 72-B, the first number of this three-digit code is “3.” The second and third numbers of the three-digit code describe the physical and chemical form of the waste. Table 2 provides a brief description of each generic code. Content codes are further defined as subcodes by an alpha trailer after the three-digit code to allow segregation of wastes that differ in one or more parameter(s). For example, the alpha trailers of the subcodes ID 322A and ID 322B may be used to differentiate between waste packaging configurations. As detailed in the RH-TRAMPAC, compliance with flammable gas limits may be demonstrated through the evaluation of compliance with either a decay heat limit or flammable gas generation rate (FGGR) limit per container specified in approved content codes. As applicable, if a container meets the watt*year criteria specified by the RH-TRAMPAC, the decay heat limits based on the dose-dependent G value may be used as specified in an approved content code. If a site implements the administrative controls outlined in the RH-TRAMPAC and Appendix 2.4 of the RH-TRU Payload Appendices, the decay heat or FGGR

  19. Remote waste handling and feed preparation for Mixed Waste Management

    International Nuclear Information System (INIS)

    Couture, S.A.; Merrill, R.D.; Densley, P.J.

    1995-05-01

    The Mixed Waste Management Facility (MWMF) at the Lawrence Livermore National Laboratory (LLNL) will serve as a national testbed to demonstrate mature mixed waste handling and treatment technologies in a complete front-end to back-end --facility (1). Remote operations, modular processing units and telerobotics for initial waste characterization, sorting and feed preparation have been demonstrated at the bench scale and have been selected for demonstration in MWMF. The goal of the Feed Preparation design team was to design and deploy a robust system that meets the initial waste preparation flexibility and productivity needs while providing a smooth upgrade path to incorporate technology advances as they occur. The selection of telerobotics for remote handling in MWMF was made based on a number of factors -- personnel protection, waste generation, maturity, cost, flexibility and extendibility. Modular processing units were selected to enable processing flexibility and facilitate reconfiguration as new treatment processes or waste streams are brought on line for demonstration. Modularity will be achieved through standard interfaces for mechanical attachment as well as process utilities, feeds and effluents. This will facilitate reconfiguration of contaminated systems without drilling, cutting or welding of contaminated materials and with a minimum of operator contact. Modular interfaces also provide a standard connection and disconnection method that can be engineered to allow convenient remote operation

  20. Integrated digital control and man-machine interface for complex remote handling systems

    International Nuclear Information System (INIS)

    Rowe, J.C.; Spille, R.F.; Zimmermann, S.D.

    1986-12-01

    The Advanced Integrated Maintenance System (AIMS) is part of a continuing effort within the Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory to develop and extend the capabilities of remote manipulation and maintenance technology. The AIMS is a totally integrated approach to remote handling in hazardous environments. State-of-the-art computer systems connected through a high-speed communication network provide a real-time distributed control system that supports the flexibility and expandability needed for large integrated maintenance applications. A Man-Machine Interface provides high-level human interaction through a powerful color graphics menu-controlled operator console. An auxiliary control system handles the real-time processing needs for a variety of support hardware. A pair of dedicated fiber-optic-linked master/slave computer system control the Advanced Servomanipulator master/slave arms using powerful distributed digital processing methods. The FORTH language was used as a real-time operating and development environment for the entire system, and all of these components are integrated into a control room concept that represents the latest advancements in the development of remote maintenance facilities for hazardous environments

  1. On the control performance of motors driven by long cables for remote handling at ITER

    International Nuclear Information System (INIS)

    Sol, Enrique del; Meek, Richard; Ruiz Morales, Emilio; Vitelli, Ricardo; Esqué, Salvador

    2016-01-01

    Highlights: • We show the dangerous effects of reflections on the actuator’s system. • We prove how to solve the reflections issue with a commercial LC filter. • We study the filter influence for short cables on two control modes. • We show the filter performance under a real remote handling operation. • We study the excellent performance of the filter for different cable lengths. - Abstract: Pulse Width Modulation (PWM) is nowadays the most used method for controlling a servo-motor. When combining PWM with motors and long cables, such as the ones that will be found at ITER, the standing waves originated are potentially very harmful for both actuator’s life span and control performance. Several methods have been investigated to cope with this issue, such as the use of chokes, filters, snubbers or active modification of the PWM signal. Of all possible locations where an electrical servo-motor could be used at ITER, the most critical scenario arises when mounting a low power motor, with a low gear ratio, in a dexterous manipulator for bilateral teleoperation. In those circumstances cable lengths of more than 150 m are expected between manipulator and control cubicle. In this paper, the effects of long cables in the system safety are analysed on a custom made test bench. The most common solutions to cope with this issue are analysed and a commercial LC filter is selected for further experimentation. An extensive set of experiments are carried out in order to validate the proposed solution for being used on remote handling equipment at ITER.

  2. On the control performance of motors driven by long cables for remote handling at ITER

    Energy Technology Data Exchange (ETDEWEB)

    Sol, Enrique del, E-mail: enrique.delsol@oxfordtechnologies.co.uk [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon OX141RL (United Kingdom); Meek, Richard [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon OX141RL (United Kingdom); Ruiz Morales, Emilio; Vitelli, Ricardo; Esqué, Salvador [Fusion for Energy, Josep Pla, 2, Barcelona 08019 (Spain)

    2016-06-15

    Highlights: • We show the dangerous effects of reflections on the actuator’s system. • We prove how to solve the reflections issue with a commercial LC filter. • We study the filter influence for short cables on two control modes. • We show the filter performance under a real remote handling operation. • We study the excellent performance of the filter for different cable lengths. - Abstract: Pulse Width Modulation (PWM) is nowadays the most used method for controlling a servo-motor. When combining PWM with motors and long cables, such as the ones that will be found at ITER, the standing waves originated are potentially very harmful for both actuator’s life span and control performance. Several methods have been investigated to cope with this issue, such as the use of chokes, filters, snubbers or active modification of the PWM signal. Of all possible locations where an electrical servo-motor could be used at ITER, the most critical scenario arises when mounting a low power motor, with a low gear ratio, in a dexterous manipulator for bilateral teleoperation. In those circumstances cable lengths of more than 150 m are expected between manipulator and control cubicle. In this paper, the effects of long cables in the system safety are analysed on a custom made test bench. The most common solutions to cope with this issue are analysed and a commercial LC filter is selected for further experimentation. An extensive set of experiments are carried out in order to validate the proposed solution for being used on remote handling equipment at ITER.

  3. Fuel handling machine and auxiliary systems for a fuel handling cell

    International Nuclear Information System (INIS)

    Suikki, M.

    2013-10-01

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  4. Fuel handling machine and auxiliary systems for a fuel handling cell

    Energy Technology Data Exchange (ETDEWEB)

    Suikki, M. [Optimik Oy, Turku (Finland)

    2013-10-15

    This working report is an update for as well as a supplement to an earlier fuel handling machine design (Kukkola and Roennqvist 2006). A focus in the earlier design proposal was primarily on the selection of a mechanical structure and operating principle for the fuel handling machine. This report introduces not only a fuel handling machine design but also auxiliary fuel handling cell equipment and its operation. An objective of the design work was to verify the operating principles of and space allocations for fuel handling cell equipment. The fuel handling machine is a remote controlled apparatus capable of handling intensely radiating fuel assemblies in the fuel handling cell of an encapsulation plant. The fuel handling cell is air tight space radiation-shielded with massive concrete walls. The fuel handling machine is based on a bridge crane capable of traveling in the handling cell along wall tracks. The bridge crane has its carriage provided with a carousel type turntable having mounted thereon both fixed and telescopic masts. The fixed mast has a gripper movable on linear guides for the transfer of fuel assemblies. The telescopic mast has a manipulator arm capable of maneuvering equipment present in the fuel handling cell, as well as conducting necessary maintenance and cleaning operations or rectifying possible fault conditions. The auxiliary fuel handling cell systems consist of several subsystems. The subsystems include a service manipulator, a tool carrier for manipulators, a material hatch, assisting winches, a vacuum cleaner, as well as a hose reel. With the exception of the vacuum cleaner, the devices included in the fuel handling cell's auxiliary system are only used when the actual encapsulation process is not ongoing. The malfunctions of mechanisms or actuators responsible for the motion actions of a fuel handling machine preclude in a worst case scenario the bringing of the fuel handling cell and related systems to a condition appropriate for

  5. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology for ex-vessel maintenance operations on auxiliary machine components. These operations consist of repairing and replacing components such as diagnostic, radio-frequency (rf) heating, and fueling systems using remotely operated maintenance equipment in the test cell. In addition, ex-vessel maintenance design also includes developing hot cell facilities for equipment decontamination, repair, and solid radioactive waste handling. The test cell maintenance philosophy is markedly influenced by the neutron/gamma shield surrounding the machine that allows personal access into the test cell one day after shutdown. Hence, maintenance operations can be performed hands-on in the test cell with the shield intact and must be remotely performed when the shield is disassembled for machine access. The constricted access to the auxiliary components of the machine affect the design requirements for the maintenance equipment and impose major spatial constraints. Several major areas of the maintenance system design are being addressed in fiscal year 1987. These include conceptual design of the manipulator system, preliminary remote equipment research and development, and definition of the hot cell, decontamination, and equipment repair facility requirements. The manipulator work includes investigating transporters and viewing/lighting subsystems. 2 figs

  6. Haptic shared control improves hot cell remote handling despite controller inaccuracies

    NARCIS (Netherlands)

    van Oosterhout, J.; Abbink, D. A.; Koning, J. F.; Boessenkool, H.; Wildenbeest, J. G. W.; Heemskerk, C. J. M.

    2013-01-01

    A promising solution to improve task performance in ITER hot cell remote handling is the use of haptic shared control. Haptic shared control can assist the human operator along a safe and optimal path with continuous guiding forces from an intelligent autonomous controller. Previous research tested

  7. Design principles for target stations and methods of remote handling at PSI

    International Nuclear Information System (INIS)

    Steiner, E.W.

    1992-01-01

    Two design concepts for target stations used at Paul Scherrer Institute (PSI) are shown. The method of the remote handling of activated elements is described and some conclusions with respect to a radioactive beam facility are given

  8. Solution for remote handling in accelerator installations

    International Nuclear Information System (INIS)

    Burgerjon, J.J.; Ekberg, E.L.; Grisham, D.L.; Horne, R.A.; Meyer, R.E.; Flatau, C.R.; Wilson, K.B.

    1977-01-01

    A description is given of a remote-handling system designed for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF), versatile enough to be used in a variety of situations found around particle accelerators. The system consists of a bilateral (force-reflecting) servomanipulator installed on an articulated hydraulic boom. The boom also carries the necessary tools and observation devices. The whole slave unit can be moved by crane or truck to the area of operation. A control cable connects the slave unit with the control station, located at a safe distance in a trailer. Various stages of development as well as some operating experience are discussed

  9. Handling equipment Selection in open pit mines by using an integrated model based on group decision making

    Directory of Open Access Journals (Sweden)

    Abdolreza Yazdani-Chamzini

    2012-10-01

    Full Text Available Process of handling equipment selection is one of the most important and basic parts in the project planning, particularly mining projects due to holding a high charge of the total project's cost. Different criteria impact on the handling equipment selection, while these criteria often are in conflicting with each other. Therefore, the process of handling equipment selection is a complex and multi criteria decision making problem. There are a variety of methods for selecting the most appropriate equipment among a set of alternatives. Likewise, according to the sophisticated structure of the problem, imprecise data, less of information, and inherent uncertainty, the usage of the fuzzy sets can be useful. In this study a new integrated model based on fuzzy analytic hierarchy process (FAHP and fuzzy technique for order preference by similarity to ideal solution (FTOPSIS is proposed, which uses group decision making to reduce individual errors. In order to calculate the weights of the evaluation criteria, FAHP is utilized in the process of handling equipment selection, and then these weights are inserted to the FTOPSIS computations to select the most appropriate handling system among a pool of alternatives. The results of this study demonstrate the potential application and effectiveness of the proposed model, which can be applied to different types of sophisticated problems in real problems.

  10. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  11. Evolving the JET virtual reality system for delivering the JET EP2 shutdown remote handling tasks

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Adrian, E-mail: adrian.williams@oxfordtechnologies.co.uk [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon, OX14 1RJ (United Kingdom); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Sanders, Stephen [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon, OX14 1RJ (United Kingdom); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Weder, Gerard [Tree-C Technology BV, Buys Ballotstraat 8, 6716 BL Ede (Netherlands); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Bastow, Roger; Allan, Peter; Hazel, Stuart [CCFE, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); JET-EFDA, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom)

    2011-10-15

    The quality, functionality and performance of the virtual reality (VR) system used at JET for preparation and implementation of remote handling (RH) operations has been progressively enhanced since its first use in the original JET remote handling shutdown in 1998. As preparation began for the JET EP2 (Enhanced Performance 2) shutdown it was recognised that the VR system being used was unable to cope with the increased functionality and the large number of 3D models needed to fully represent the JET in-vessel components and tooling planned for EP2. A bespoke VR software application was developed in collaboration with the OEM, which allowed enhancements to be made to the VR system to meet the requirements of JET remote handling in preparation for EP2. Performance improvements required to meet the challenges of EP2 could not be obtained from the development of the new VR software alone. New methodologies were also required to prepare source, CATIA models for use in the VR using a collection of 3D software packages. In collaboration with the JET drawing office, techniques were developed within CATIA using polygon reduction tools to reduce model size, while retaining surface detail at required user limits. This paper will discuss how these developments have played an essential part in facilitating EP2 remote handling task development and examine their impact during the EP2 shutdown.

  12. Evolving the JET virtual reality system for delivering the JET EP2 shutdown remote handling tasks

    International Nuclear Information System (INIS)

    Williams, Adrian; Sanders, Stephen; Weder, Gerard; Bastow, Roger; Allan, Peter; Hazel, Stuart

    2011-01-01

    The quality, functionality and performance of the virtual reality (VR) system used at JET for preparation and implementation of remote handling (RH) operations has been progressively enhanced since its first use in the original JET remote handling shutdown in 1998. As preparation began for the JET EP2 (Enhanced Performance 2) shutdown it was recognised that the VR system being used was unable to cope with the increased functionality and the large number of 3D models needed to fully represent the JET in-vessel components and tooling planned for EP2. A bespoke VR software application was developed in collaboration with the OEM, which allowed enhancements to be made to the VR system to meet the requirements of JET remote handling in preparation for EP2. Performance improvements required to meet the challenges of EP2 could not be obtained from the development of the new VR software alone. New methodologies were also required to prepare source, CATIA models for use in the VR using a collection of 3D software packages. In collaboration with the JET drawing office, techniques were developed within CATIA using polygon reduction tools to reduce model size, while retaining surface detail at required user limits. This paper will discuss how these developments have played an essential part in facilitating EP2 remote handling task development and examine their impact during the EP2 shutdown.

  13. Fuel Handling Equipment Maintenance for Critical Path Time Savings

    Energy Technology Data Exchange (ETDEWEB)

    Saville, M.; Williams, A.

    2015-07-01

    By sharing lessons learned and operating experience gained by AREVA Stearns RogerTM Services from more than 45 years of servicing, maintaining, and upgrading Fuel Handling Equipment (FHE) and as the original equipment manufacturer to 56% of domestic U.S. FHE (PWR and BWR) as well as 19 units overseas, this paper presents trends and market forces that have led to the neglect of FHE, the risks of not adequately maintaining FHE, and the financial benefits of proactively maintaining FHE. The benefit to audiences is to come to a better understanding of how critical path delays can be avoided and thus reduce nuclear power plant operating costs. Note that statistics and monetary values given herein are based on recent typical experiences of AREVA Stearns RogerTM Services. Examples discussed are based on actual lessons learned. For the purposes of this paper, upgrades are considered a part of equipment maintenance unless specifically discussed separately. (Author)

  14. Influence of visual feedback on human task performance in ITER remote handling

    NARCIS (Netherlands)

    Schropp, Gwendolijn Y R; Heemskerk, Cock J M; Kappers, Astrid M L; Bergmann Tiest, Wouter M; Elzendoorn, Ben S Q; Bult, David

    In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures.

  15. Analysis of operational possibilities and conditions of remote handling systems in nuclear facilities

    International Nuclear Information System (INIS)

    Hourfar, D.

    1989-01-01

    Accepting the development of the occupational radiation exposure in nuclear facilities, it will be showing possibilities of cost effective reduction of the dose rate through the application of robots and manipulators for the maintenance of nuclear power plants, fuel reprocessing plants, decommissioning and dismantling of the mentioned plants. Based on the experiences about industrial robot applications by manufacturing and manipulator applications by the handling of radioactive materials as well as analysis of the handling procedures and estimation of the dose intensity, it will be defining task-orientated requirements for the conceptual design of the remote handling systems. Furthermore the manifold applications of stationary and mobil arranged handling systems in temporary or permanent operation are described. (orig.) [de

  16. Proceedings of the international topical meeting on remote systems and robotics in hostile environments

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This book contains the proceedings of the International Topical Meeting on Remote Systems and Robotics in Hostile Environments. It is organized under the following sessions: Worldwide Applications Overview; Operating Mobile Systems; Sensors and Control Systems; Space Applications; Reactor Operations and Surveillance; Remote Equipment for Hazardous Operations; Future Mobile System; Mining and Construction Operations; Special Applications; Hot Cell Applications; Processing; Reactor Operations and Maintenance; Decontamination and Waste Handling; Remote Handling Development and Demonstration

  17. The ITER EC H and CD Upper Launcher: Analysis of vertical Remote Handling applied to the BSM maintenance

    International Nuclear Information System (INIS)

    Grossetti, Giovanni; Aiello, Gaetano; Heemskerk, Cock; Elzendoorn, Ben; Geßner, Robby; Koning, Jarich; Meier, Andreas; Ronden, Dennis; Späh, Peter; Scherer, Theo; Schreck, Sabine; Strauß, Dirk; Vaccaro, Alessandro

    2013-01-01

    This paper deals with Remote Handling activities foreseen on the Blanket Shield Module, the plasma facing component of the ITER Electron Cyclotron Heating and Current Drive Upper Launcher. The maintenance configuration considered here is the Vertical Remote Handling, meaning gravity acting along the launcher radial axis. The plant, where the maintenance under consideration is occurring, is the Hot Cell Facility Work Cell. The study here reported has been carried out within the presently ongoing EFDA Goal Oriented Training program on Remote Handling (GOT-RH), which aims to support ITER activities. This document and its contents have to be considered as part of a more vast RAMI analysis to be developed within the GOT-RH, which aims to maximize the Electron Cyclotron Heating and Current Drive system availability. The Baseline CAD model of the Electron Cyclotron Heating and Current Drive Upper Launcher is currently in its preliminary design phase and does not provide enough details for developing a fully detailed maintenance strategy. Therefore, through a System Engineering approach, a set of assumptions was conceived on the launcher structure, as a basis for development of a Remote Handling strategy. Moreover, to compare different design solutions related to the possibility of integrating a quasi-optical component into the Blanket Shield Module, a Trade-Off was made, and its contents are shown here. The outcome of this System Engineering approach has been formalized into Task Definition Forms whose contents are reported here. The Remote Handling strategy presented in this work will be tested in the near future both through Virtual Reality simulations and through prototype experiments

  18. The ITER EC H and CD Upper Launcher: Analysis of vertical Remote Handling applied to the BSM maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Grossetti, Giovanni, E-mail: giovanni.grossetti@kit.edu [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Aiello, Gaetano [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Heemskerk, Cock [Heemskerk Innovative Technology, Merelhof 2, 2172 HZ Sassenheim (Netherlands); Elzendoorn, Ben [FOM Institute DIFFER, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Geßner, Robby [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Koning, Jarich [Heemskerk Innovative Technology, Merelhof 2, 2172 HZ Sassenheim (Netherlands); Meier, Andreas [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Ronden, Dennis [FOM Institute DIFFER, P.O. Box 1207, 3430 BE Nieuwegein (Netherlands); Späh, Peter; Scherer, Theo; Schreck, Sabine; Strauß, Dirk; Vaccaro, Alessandro [Karlsruhe Institute of Technology, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany)

    2013-10-15

    This paper deals with Remote Handling activities foreseen on the Blanket Shield Module, the plasma facing component of the ITER Electron Cyclotron Heating and Current Drive Upper Launcher. The maintenance configuration considered here is the Vertical Remote Handling, meaning gravity acting along the launcher radial axis. The plant, where the maintenance under consideration is occurring, is the Hot Cell Facility Work Cell. The study here reported has been carried out within the presently ongoing EFDA Goal Oriented Training program on Remote Handling (GOT-RH), which aims to support ITER activities. This document and its contents have to be considered as part of a more vast RAMI analysis to be developed within the GOT-RH, which aims to maximize the Electron Cyclotron Heating and Current Drive system availability. The Baseline CAD model of the Electron Cyclotron Heating and Current Drive Upper Launcher is currently in its preliminary design phase and does not provide enough details for developing a fully detailed maintenance strategy. Therefore, through a System Engineering approach, a set of assumptions was conceived on the launcher structure, as a basis for development of a Remote Handling strategy. Moreover, to compare different design solutions related to the possibility of integrating a quasi-optical component into the Blanket Shield Module, a Trade-Off was made, and its contents are shown here. The outcome of this System Engineering approach has been formalized into Task Definition Forms whose contents are reported here. The Remote Handling strategy presented in this work will be tested in the near future both through Virtual Reality simulations and through prototype experiments.

  19. A MGy radiation-hardened sensor instrumentation link for nuclear reactor monitoring and remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Verbeeck, Jens; Cao, Ying [KU Leuven - KUL, Div. LRD-MAGyICS, Kasteelpark Arenberg 10, 3001 Heverlee (Belgium); Van Uffelen, Marco; Mont Casellas, Laura; Damiani, Carlo; Morales, Emilio Ruiz; Santana, Roberto Ranz [Fusion for Energy - F4E, c/Josep,n deg. 2, Torres Diagonal Litoral, Ed. B3, 08019 Barcelona (Spain); Meek, Richard; Haist, Bernhard [Oxford Technologies Ltd. OTL, 7 Nuffield Way, Abingdon OX14 1RL (United Kingdom); De Cock, Wouter; Vermeeren, Ludo [SCK-CEN, Boeretang 200, 2400 Mol (Belgium); Steyaert, Michiel [KU Leuven, ESAT-MICAS, KasteelparkArenberg 10, 3001 Heverlee (Belgium); Leroux, Paul [KU Leuven, ESAT-MICAS, KasteelparkArenberg 10, 3001 Heverlee (Belgium)

    2015-07-01

    Decommissioning, dismantling and remote handling applications in nuclear facilities all require robotic solutions that are able to survive in radiation environments. Recently raised safety, radiation hardness and cost efficiency demands from both the nuclear regulatory and the society impose severe challenges in traditional methods. For example, in case of the dismantling of the Fukushima sites, solutions that survive accumulated doses higher than 1 MGy are mandatory. To allow remote operation of these tools in nuclear environments, electronics were used to be shielded with several centimeters of lead or even completely banned in these solutions. However, shielding electronics always leads to bulky and heavy solutions, which reduces the flexibility of robotic tools. It also requires longer repair time and produces extra waste further in a dismantling or decommissioning cycle. In addition, often in current reactor designs, due to size restrictions and the need to inspect very tight areas there are limitations to the use of shielding. A MGy radiation-hardened sensor instrumentation link developed by MAGyICS provides a solution to build a flexible, easy removable and small I and C module with MGy radiation tolerance without any shielding. Hereby it removes all these pains to implement electronics in robotic tools. The demonstrated solution in this poster is developed for ITER Remote Handling equipments operating in high radiation environments (>1 MGy) in and around the Tokamak. In order to obtain adequately accurate instrumentation and control information, as well as to ease the umbilical management, there is a need of front-end electronics that will have to be located close to those actuators and sensors on the remote handling tool. In particular, for diverter remote handling, it is estimated that these components will face gamma radiation up to 300 Gy/h (in-vessel) and a total dose of 1 MGy. The radiation-hardened sensor instrumentation link presented here, consists

  20. High level radioactive waste vitrification process equipment component testing

    International Nuclear Information System (INIS)

    Siemens, D.H.; Heath, W.O.; Larson, D.E.; Craig, S.N.; Berger, D.N.; Goles, R.W.

    1985-04-01

    Remote operability and maintainability of vitrification equipment were assessed under shielded-cell conditions. The equipment tested will be applied to immobilize high-level and transuranic liquid waste slurries that resulted from plutonium production for defense weapons. Equipment tested included: a turntable for handling waste canisters under the melter; a removable discharge cone in the melter overflow section; a thermocouple jumper that extends into a shielded cell; remote instrument and electrical connectors; remote, mechanical, and heat transfer aspects of the melter glass overflow section; a reamer to clean out plugged nozzles in the melter top; a closed circuit camera to view the melter interior; and a device to retrieve samples of the glass product. A test was also conducted to evaluate liquid metals for use in a liquid metal sealing system

  1. The design of in-cell crane handling systems for nuclear plants

    International Nuclear Information System (INIS)

    Hansford, S.M.; Scott, R.

    1992-01-01

    The reprocessing and waste management facilities at (BNFL's) British Nuclear Fuels Limited's Sellafield site make extensive use of crane handling systems. These range from conventional mechanical handling operations as used generally in industry to high integrity applications through to remote robotic handling operations in radiation environments. This paper describes the design methodologies developed for the design of crane systems for remote handling operations - in-cell crane systems. In most applications the in-cell crane systems are an integral part of the plant process equipment and reliable and safe operations are a key design parameter. Outlined are the techniques developed to achieve high levels of crane system availability for operations in hazardous radiation environments. These techniques are now well established and proven through many years of successful plant operation. A recent application of in-cell crane handling systems design for process duty application is described. The benefits of a systematic design approach and a functionally-based engineering organization are also highlighted. (author)

  2. Remote-handled transuranic waste study

    International Nuclear Information System (INIS)

    1995-10-01

    The Waste Isolation Pilot Plant (WIPP) was developed by the US Department of Energy (DOE) as a research and development facility to demonstrate the safe disposal of transuranic (TRU) radioactive wastes generated from the Nation's defense activities. The WIPP disposal inventory will include up to 250,000 cubic feet of TRU wastes classified as remote handled (RH). The remaining inventory will include contact-handled (CH) TRU wastes, which characteristically have less specific activity (radioactivity per unit volume) than the RH-TRU wastes. The WIPP Land Withdrawal Act (LWA), Public Law 102-579, requires a study of the effect of RH-TRU waste on long-term performance. This RH-TRU Waste Study has been conducted to satisfy the requirements defined by the LWA and is considered by the DOE to be a prudent exercise in the compliance certification process of the WIPP repository. The objectives of this study include: conducting an evaluation of the impacts of RH-TRU wastes on the performance assessment (PA) of the repository to determine the effects of Rh-TRU waste as a part of the total WIPP disposal inventory; and conducting a comparison of CH-TRU and RH-TRU wastes to assess the differences and similarities for such issues as gas generation, flammability and explosiveness, solubility, and brine and geochemical interactions. This study was conducted using the data, models, computer codes, and information generated in support of long-term compliance programs, including the WIPP PA. The study is limited in scope to post-closure repository performance and includes an analysis of the issues associated with RH-TRU wastes subsequent to emplacement of these wastes at WIPP in consideration of the current baseline design. 41 refs

  3. EBR-II fuel handling console digital upgrade

    International Nuclear Information System (INIS)

    Peters, G.G.; Wiege, D.D.; Christensen, L.J.

    1995-01-01

    The main fuel handling console and control system at the Experimental Breeder Reactor II (EBR-II) are being upgraded to a computerized system using high-end workstations for the operator interface and a programmable logic controller (PLC) for the control system. Two-dimensional (2D) and three-dimensional (3D) computer graphics will be provided for the operator which will show the relative position of under-sodium fuel handling equipment. This equipment is operated remotely with no means of directly viewing the transfer. This paper describes various aspects of the modification including reasons for the upgrade, capabilities the new system provides over the old control system, philosophies and rationale behind the new design, testing and simulation work, diagnostic features, and the advanced graphics techniques used to display information to the operator

  4. Remote maintenance demonstration tests at a pilot plant for high level waste vitrification

    International Nuclear Information System (INIS)

    Selig, M.

    1984-01-01

    The remote maintenance and replacement technique designed for a radioactive vitrification plant have been developed and tested in a full scale handling mockup and in an inactive pilot plants by the Central Engineering Department of the Karlsruhe Nuclear Research Center. As a result of the development work and the tests it has been proved that the remote maintenance technique and remote handling equipment can be used without any technical problems and are suited for application in a radioactive waste vitrification plant

  5. Hot Laboratories and Remote Handling

    International Nuclear Information System (INIS)

    Bart, G.; Blanc, J.Y.; Duwe, R.

    2003-01-01

    The European Working Group on ' Hot Laboratories and Remote Handling' is firmly established as the major contact forum for the nuclear R and D facilities at the European scale. The yearly plenary meetings intend to: - Exchange experience on analytical methods, their implementation in hot cells, the methodologies used and their application in nuclear research; - Share experience on common infrastructure exploitation matters such as remote handling techniques, safety features, QA-certification, waste handling; - Promote normalization and co-operation, e.g., by looking at mutual complementarities; - Prospect present and future demands from the nuclear industry and to draw strategic conclusions regarding further needs. The 41. plenary meeting was held in CEA Saclay from September 22 to 24, 2003 in the premises and with the technical support of the INSTN (National Institute for Nuclear Science and Technology). The Nuclear Energy Division of CEA sponsored it. The Saclay meeting was divided in three topical oral sessions covering: - Post irradiation examination: new analysis methods and methodologies, small specimen technology, programmes and results; - Hot laboratory infrastructure: decommissioning, refurbishment, waste, safety, nuclear transports; - Prospective research on materials for future applications: innovative fuels (Generation IV, HTR, transmutation, ADS), spallation source materials, and candidate materials for fusion reactor. A poster session was opened to transport companies and laboratory suppliers. The meeting addressed in three sessions the following items: Session 1 - Post Irradiation Examinations. Out of 12 papers (including 1 poster) 7 dealt with surface and solid state micro analysis, another one with an equally complex wet chemical instrumental analytical technique, while the other four papers (including the poster) presented new concepts for digital x-ray image analysis; Session 2 - Hot laboratory infrastructure (including waste theme) which was

  6. 29 CFR 1926.1000 - Rollover protective structures (ROPS) for material handling equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Rollover protective structures (ROPS) for material handling equipment. 1926.1000 Section 1926.1000 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY... CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1000 Rollover protective structures...

  7. 49 CFR 232.609 - Handling of defective equipment with ECP brake systems.

    Science.gov (United States)

    2010-10-01

    ... (ECP) Braking Systems § 232.609 Handling of defective equipment with ECP brake systems. (a) Ninety-five... systems. 232.609 Section 232.609 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRAKE SYSTEM SAFETY STANDARDS FOR FREIGHT...

  8. System for remote routine monitoring of power equipment at TPP and NPP

    International Nuclear Information System (INIS)

    Kantsedalov, V.G.; Samojlenko, V.P.; Doroshenko, V.A.

    1988-01-01

    A system for remote routine monitoring of TPP and NPP pipeline metals is described. The principal functional unit of the system is the unit of remote routine methods and techniques for studying and monitoring the metal and properties. The system is equipped with 5 types of routine monitoring equipment: robots, remote aggregated complexes, periodical diagnostic monitors, other means of metal diagnostics (endoscopes, introscopes). All current information enters the unit for estimating and forecasting the service life of power unit, where it is compared with the standard indices of reliability, duravility and efficiency. The system considered permits to reduce significantly or minimize the scope of works on metal monitoring during overhauls, increase intermonitoring and interrepairing compaigns to 8 years

  9. Development of a remotely maintainable radio-frequency module for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Snider, J.D.

    1988-01-01

    The Compact Ignition Tokamak (CIT) will require reliable remote handling (RH) systems to overcome failures in diagnostic and operational equipment. Oak Ridge National laboratory (ORNL) is responsible for the ex-vessel remote maintenance systems for the CIT. Part of this effort is performing remote maintenance demonstrations on replicas of various CIT equipment. To ensure successful RH, the machine must be designed with proven remote maintenance features. In the demonstrations, critical remote maintenance features are tested before actual CIT equipment designs are finalized. Designs and procedures required to remotely remove and install a radio-frequency (rf) module from a modplane port on the tokamak were recently demonstrated at ORNL. This testing identified both successful design features for remote maintenance of the rf module and areas that require further development. 1 ref., 11 figs

  10. Development of remote welding equipment and techniques for the TFTR vacuum vessel

    International Nuclear Information System (INIS)

    Masson, L.S.; Watts, K.D.; Larson, R.A.; Aldrich, W.C.

    1980-01-01

    In the event that the TFTR vacuum vessel is damaged or one of the toroidal field coils fails after the system has become substantially activated, it is necessary to remotely remove and replace the damaged section of the vessel using remote handling procedures. This paper describes a welding system developed through the final design stage to perform the remote welding necessary during the replacement operation. Information is presented describing the vessel configuration, the replacement sequence, the welding system requirements, welder configuration, supporting systems, the weld development program and future development requirements

  11. Development of equipment for fabricating DUPIC fuel powder

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H.

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs

  12. Development of equipment for fabricating DUPIC fuel powder

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs.

  13. Nuclear robotics and remote handling at Harwell Laboratory

    International Nuclear Information System (INIS)

    Abel, E.; Brown, M.H.; Fischer, P.J.; Garlick, D.R.; Hanna, T.T.; Siva, K.V.

    1988-01-01

    After reviewing robotics technology and its possible application in nuclear remote handling systems of the future, six main research topics were identified where particular effort should be made. The Harwell Nuclear Robotics Programme is currently establishing sets of demonstration hardware which will allow generic research to be carried out on telerobotics, systems integration, the man machine interface, communications, servo systems and radiation tolerance. The objectives of the demonstrators are to allow validation of the techniques required for successful active facility applications such as decommissioning, decontamination, refurbishment, maintenance and repair, and to act as training aids to encourage plant designers and operators to adopt developments in new technology. (author)

  14. Standard guide for hot cell specialized support equipment and tools

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 Intent: 1.1.1 This guide presents practices and guidelines for the design and implementation of equipment and tools to assist assembly, disassembly, alignment, fastening, maintenance, or general handling of equipment in a hot cell. Operating in a remote hot cell environment significantly increases the difficulty and time required to perform a task compared to completing a similar task directly by hand. Successful specialized support equipment and tools minimize the required effort, reduce risks, and increase operating efficiencies. 1.2 Applicability: 1.2.1 This guide may apply to the design of specialized support equipment and tools anywhere it is remotely operated, maintained, and viewed through shielding windows or by other remote viewing systems. 1.2.2 Consideration should be given to the need for specialized support equipment and tools early in the design process. 1.2.3 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conv...

  15. Evaluation of Design Models of Process Equipment for Use in PRIDE: Remote Operability and Maintainability

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Kim, Sung Hyun; Yu, Seung Nam; Lee, Jong Kwang; Park, Byung Suk; Han, Jong Hui; Cho, Il Je; Lee, Han Soo

    2012-01-01

    Process equipment for pyroprocessing are being developed at KAERI (Korea Atomic Energy Research Institute). Those equipment should be operated and maintained in a fully remote manner in the argon gas filled cell of PRIDE (PyRoprocess Integrated inactive DEmonstration facility) at KAERI because direct human access to the in-cell is not possible during an operation due to the high toxicity of the argon gas. To make such process equipment remotely operable and maintainable, their design developments have been tested and evaluated in a simulator before they are constructed. A simulator as a means of evaluating the remote operability and maintainability of the design models of process equipment for pyroprocessing is described, and results of the design models tested and evaluated in a simulator are presented

  16. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  17. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  18. Development of remote equipment for a DUPIC fuel fabrication at KAERI

    International Nuclear Information System (INIS)

    Lee, Jungwon; Kim, Kiho; Park, Geunil; Yang, Myungseung; Song, Keechan

    2007-01-01

    The DUPIC (Direct Use of spent PWR fuel In CANDU reactors) technology is to directly refabricate CANDU fuel from spent PWR fuel without any separation of the fissile materials and fission products. Thus, the DUPIC fuel material always remains in a highly radioactive state, which requires a remote fuel fabrication in a hot-cell. About 25 pieces of remote equipment including auxiliary systems such as a hot-cell shield plug were developed and installed in a hot cell. In order to supply a high electric current to a sintering furnace in-cell from an outside cell, a shield plug was developed. It consists of three components - a steel shield plug with an embedded spiral cooling line, stepped copper bus bars, and a shielding lead block. Experiments to evaluate the performance of the sintering furnace with the developed shield plug were carried out. It was concluded that, from the experimental results, the newly developed hot-cell shield plug satisfied all the requirements for a remote operation on a sintering furnace. DUPIC fuel pellets and elements were successfully fabricated with the developed remote equipment. (authors)

  19. Minimizing the carbon footprint of material handling equipment: Comparison of electric and LPG forklifts

    Energy Technology Data Exchange (ETDEWEB)

    Facchini, F.; Mummolo, G.; Mossa, G.; Digiesi, S.; Boenzi, F.; Verriello, R.

    2016-07-01

    Purpose: The aim of this study is to identify the best Material Handling Equipment (MHE) to minimize the carbon footprint of inbound logistic activities, based on the type of the warehouse (layout, facilities and order-picking strategy) as well as the weight of the loads to be handled. Design/methodology/approach: A model to select the best environmental MHE for inbound logistic activities has been developed. Environmental performance of the MHE has been evaluated in terms of carbon Footprint (CF). The model is tested with a tool adopting a VBA macro as well as a simulation software allowing the evaluation of energy and time required by the forklift in each phase of the material handling cycle: picking, sorting and storing of the items. Findings: Nowadays, it is not possible to identify ‘a priori’ a particular engine equipped forklift performing better than others under an environmental perspective. Consistently, the application of the developed model allows to identify the best MHE tailored to each case analyzed. Originality/value: This work gives a contribution to the disagreement between environmental performances of forklifts equipped with different engines. The developed model can be considered a valid support for decision makers to identify the best MHE minimizing the carbon footprint of inbound logistic activities.

  20. Minimizing the carbon footprint of material handling equipment: Comparison of electric and LPG forklifts

    International Nuclear Information System (INIS)

    Facchini, F.; Mummolo, G.; Mossa, G.; Digiesi, S.; Boenzi, F.; Verriello, R.

    2016-01-01

    Purpose: The aim of this study is to identify the best Material Handling Equipment (MHE) to minimize the carbon footprint of inbound logistic activities, based on the type of the warehouse (layout, facilities and order-picking strategy) as well as the weight of the loads to be handled. Design/methodology/approach: A model to select the best environmental MHE for inbound logistic activities has been developed. Environmental performance of the MHE has been evaluated in terms of carbon Footprint (CF). The model is tested with a tool adopting a VBA macro as well as a simulation software allowing the evaluation of energy and time required by the forklift in each phase of the material handling cycle: picking, sorting and storing of the items. Findings: Nowadays, it is not possible to identify ‘a priori’ a particular engine equipped forklift performing better than others under an environmental perspective. Consistently, the application of the developed model allows to identify the best MHE tailored to each case analyzed. Originality/value: This work gives a contribution to the disagreement between environmental performances of forklifts equipped with different engines. The developed model can be considered a valid support for decision makers to identify the best MHE minimizing the carbon footprint of inbound logistic activities.

  1. Minimizing the carbon footprint of material handling equipment: Comparison of electric and LPG forklifts

    Directory of Open Access Journals (Sweden)

    Francesco Facchini

    2016-12-01

    Full Text Available Purpose: The aim of this study is to identify the best Material Handling Equipment (MHE to minimize the carbon footprint of inbound logistic activities, based on the type of the warehouse (layout, facilities and order-picking strategy as well as the weight of the loads to be handled. Design/methodology/approach: A model to select the best environmental MHE for inbound logistic activities has been developed. Environmental performance of the MHE has been evaluated in terms of carbon Footprint (CF. The model is tested with a tool adopting a VBA macro as well as a simulation software allowing the evaluation of energy and time required by the forklift in each phase of the material handling cycle: picking, sorting and storing of the items. Findings: Nowadays, it is not possible to identify ‘a priori’ a particular engine equipped forklift performing better than others under an environmental perspective. Consistently, the application of the developed model allows to identify the best MHE tailored to each case analyzed.   Originality/value: This work gives a contribution to the disagreement between environmental performances of forklifts equipped with different engines. The developed model can be considered a valid support for decision makers to identify the best MHE minimizing the carbon footprint of inbound logistic activities.

  2. Concept design of divertor remote handling system for the FAST machine

    Energy Technology Data Exchange (ETDEWEB)

    Di Gironimo, G., E-mail: giuseppe.digironimo@unina.it [Association Euratom/ENEA/CREATE, Università di Napoli Federico II, 80125 Napoli (Italy); Labate, C.; Renno, F. [Association Euratom/ENEA/CREATE, Università di Napoli Federico II, 80125 Napoli (Italy); Brolatti, G.; Crescenzi, F.; Crisanti, F. [CR ENEA Frascati, Via E. Fermi 27, Frascati (RM) (Italy); Lanzotti, A. [Association Euratom/ENEA/CREATE, Università di Napoli Federico II, 80125 Napoli (Italy); Lucca, F. [LT Calcoli SaS, Piazza Prinetti 26/B, 23807 Merate (Italy); Siuko, M. [VTT Systems Engineering, Tekniikankatu 1, 33720 Tampere (Finland)

    2013-10-15

    The paper presents a concept design of a remote handling (RH) system oriented to maintenance operations on the divertor second cassette in FAST, a satellite of ITER tokamak. Starting from ITER configuration, a suitably scaled system, composed by a cassette multifunctional mover (CMM) connected to a second cassette end-effector (SCEE), can represent a very efficient solution for FAST machine. The presence of a further system able to open the divertor port, used for RH aims, and remove the first cassette, already aligned with the radial direction of the port, is presumed. Although an ITER-like system maintains essentially shape and proportions of its reference configuration, an appropriate arrangement with FAST environment is needed, taking into account new requirements due to different dimensions, weights and geometries. The use of virtual prototyping and the possibility to involve a great number of persons, not only mechanical designers but also physicist, plasma experts and personnel assigned to remote handling operations, made them to share the multiphysics design experience, according to a concurrent engineering approach. Nevertheless, according to the main objective of any satellite tokamak, such an approach benefits the study of enhancements to ITER RH system and the exploration of alternative solutions.

  3. Design considerations, tooling, and equipment for remote in-service inspection of radioactive piping and pressure-vessel systems

    International Nuclear Information System (INIS)

    Swannack, D.L.; Schmoker, D.S.

    1983-01-01

    This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor-system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  4. Powder handling for automated fuel processing

    International Nuclear Information System (INIS)

    Frederickson, J.R.; Eschenbaum, R.C.; Goldmann, L.H.

    1989-01-01

    Installation of the Secure Automated Fabrication (SAF) line has been completed. It is located in the Fuel Cycle Plant (FCP) at the Department of Energy's (DOE) Hanford site near Richland, Washington. The SAF line was designed to fabricate advanced reactor fuel pellets and assemble fuel pins by automated, remote operation. This paper describes powder handling equipment and techniques utilized for automated powder processing and powder conditioning systems in this line. 9 figs

  5. Design and construction of γ-rays irradiation facility for remote-handling parts and components of fusion reactor

    International Nuclear Information System (INIS)

    Yagi, Toshiaki; Morita, Yousuke; Seguchi, Tadao

    1995-03-01

    For the evaluation of radiation resistance of remote-handling system for International Thermonuclear Experimental Reactor(ITER), 'high dose-rate and high temperature (upper 350degC) γ-rays irradiation facility' was designed and constructed. In this facility, the parts and components of remote-handling system such as sensing devices, motors, optical glasses, wires and cables, etc., are tested by irradiation with 2x10 6 Roentgen/h Co-60 γ-rays at a temperature up to 350degC under various atmospheres (dry nitrogen gas, argon gas, dry air and vacuum). (author)

  6. User's manual for remote-handled transuranic waste container welding and inspection fixture

    International Nuclear Information System (INIS)

    Hauptmann, J.P.

    1985-09-01

    Rockwell Hanford Operations (Rockwell) has designed built, and tested a prototype remotely operated welding and inspection fixture to be used in making the closure weld on the remote-handled transuranic (RH-TRU) waste container. The RH-TRU waste container has an average TRU concentration in excess of 100 nCi/gm, and a surface radiation dose rate in excess of 200 mrem/h, but not exceeding 100 rem/h. The RH-TRU waste container is to be used by defense waste generator sites in the United States for final packaging of RH-TRU wastes and is compatible with the requirements of the Waste Isolation Pilot Plant (WIPP) and the WIPP handling system. Standard and stacked RH-TRU container designs are available. The standard container is 26 in. in dia. by 121 in. high; the stacked containers are 26 in. in dia. by 61.25 in. high. After loading, two stacked containers are fitted and welded together to form the identical measurements of the standard 121-in. container. The prototype RH-TRU waste container welding and inspection fixture was intended for test and evaluation only, and not for installation in an operating facility. The final RH-TRU waste container welding and inspection fixture drawings (see appendix) incorporate several changes made following operational testing of the original fixture. These modifications are identified in this manual. However, not all modifications have been functionally tested. The purpose of this manual is to aid waste generator sites in designing a remotely operated welding and inspection fixture that will conform to their own requirements. Modifications to the Rockwell design must be evaluated for structural and WIPP handling requirements. This manual also provides design philosophy, component vendor information, and cost estimates

  7. Influence of visual feedback on human task performance in ITER remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Schropp, Gwendolijn Y.R., E-mail: g.schropp@heemskerk-innovative.nl [Utrecht University, Utrecht (Netherlands); Heemskerk Innovative Technology, Noordwijk (Netherlands); Heemskerk, Cock J.M. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Kappers, Astrid M.L.; Tiest, Wouter M. Bergmann [Helmholtz Institute-Utrecht University, Utrecht (Netherlands); Elzendoorn, Ben S.Q. [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM/FOM, Partner in the Trilateral Euregio Clusterand ITER-NL, PO box 1207, 3430 BE Nieuwegein (Netherlands); Bult, David [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM/FOM, Partner in the Trilateral Euregio Clusterand ITER-NL, PO box 1207, 3430 BE Nieuwegein (Netherlands)

    2012-08-15

    Highlights: Black-Right-Pointing-Pointer The performance of human operators in an ITER-like test facility for remote handling. Black-Right-Pointing-Pointer Different sources of visual feedback influence how fast one can complete a maintenance task. Black-Right-Pointing-Pointer Insights learned could be used in design of operator work environment or training procedures. - Abstract: In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures. Additional verification and validation is based on simulation and hardware tests in 1:1 scale mockups. The Master Slave manipulator system (MS2) Benchmark Product was designed to implement a reference set of maintenance tasks representative for ITER remote handling. Experiments were performed with two versions of the Benchmark Product. In both experiments, the quality of visual feedback varied by exchanging direct view with indirect view (using video cameras) in order to measure and analyze its impact on human task performance. The first experiment showed that both experienced and novice RH operators perform a simple task significantly better with direct visual feedback than with camera feedback. A more complex task showed a large variation in results and could not be completed by many novice operators. Experienced operators commented on both the mechanical design and visual feedback. In a second experiment, a more elaborate task was tested on an improved Benchmark product. Again, the task was performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance.

  8. Influence of visual feedback on human task performance in ITER remote handling

    International Nuclear Information System (INIS)

    Schropp, Gwendolijn Y.R.; Heemskerk, Cock J.M.; Kappers, Astrid M.L.; Tiest, Wouter M. Bergmann; Elzendoorn, Ben S.Q.; Bult, David

    2012-01-01

    Highlights: ► The performance of human operators in an ITER-like test facility for remote handling. ► Different sources of visual feedback influence how fast one can complete a maintenance task. ► Insights learned could be used in design of operator work environment or training procedures. - Abstract: In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures. Additional verification and validation is based on simulation and hardware tests in 1:1 scale mockups. The Master Slave manipulator system (MS2) Benchmark Product was designed to implement a reference set of maintenance tasks representative for ITER remote handling. Experiments were performed with two versions of the Benchmark Product. In both experiments, the quality of visual feedback varied by exchanging direct view with indirect view (using video cameras) in order to measure and analyze its impact on human task performance. The first experiment showed that both experienced and novice RH operators perform a simple task significantly better with direct visual feedback than with camera feedback. A more complex task showed a large variation in results and could not be completed by many novice operators. Experienced operators commented on both the mechanical design and visual feedback. In a second experiment, a more elaborate task was tested on an improved Benchmark product. Again, the task was performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance.

  9. The remote exchange of the JET divertor

    International Nuclear Information System (INIS)

    Pick, M.

    1999-01-01

    In 1997 a series of experiments were performed in the JET machine using deuterium-tritium (D-T) mixtures and resulting in discharges with record breaking fusion power and fusion energy. The experiments demonstrated a key technology required for fusion, namely the on-line operation of a tritium fuel re-processing plant. These experiments left the inside of the JET vessel inaccessible to manned access for approximately one year. During this time, the complete Mark IIA divertor, a major system within the torus, was successfully removed and replaced with a new divertor design, the Mark II Gas Box divertor, using only remote handling techniques. This was the first application of the JET remote handling system and a demonstration of a further key ITER technology. The paper explains the methodology and operational approach taken to achieve the results using the remote handling system developed at JET. It describes the remote handling equipment including the force-reflecting servo-manipulator, the specialised tools designed, the facilities needed, and the trials, planning and training carried out to ensure the safe, reliable and rapid completion of the remote handling tasks. The planned tasks are outlined including the execution of the novel procedure for a remote, sub-millimetre precision, dimensional survey of the divertor support structure using digital photogrammetry. Furthermore the paper shows how the adaptability of the system was used to successfully undertake a large number of unplanned tasks including the removal of damaged tiles, a damaged diagnostic system and the vacuum cleaning of diagnostic windows. (author)

  10. Remote handling equipment for the decommissioning of the Windscale Advanced Gas Cooled Reactor

    International Nuclear Information System (INIS)

    Barker, A.; Birss, I.R.; Fish, G.

    1984-01-01

    A decision to decommission the Windscale Advanced Gas Cooled Reactor was taken shortly after reactor shutdown in 1981. The fuel has now been discharged and the decommissioning programme will last about 10-12 years. The paper describes the programme and objectives and deals with methods of handling and disposing of the radioactive waste material. The main new facility required is a Waste Packaging Building adjacent to the existing reactor in which the waste boxes will be filled, active waste encapsulated in concrete and the boxes cleaned, swabbed and monitored to comply with IAEA transport regulations. The handling machine concept and features are described. The assaying and packaging of the waste material, the control of box movement and the process of concrete encapsulation is described. The paper concludes with a description of the development programme to support the Project. The tasks include a study of cutting techniques, production and control of dust and smoke, viewing and lighting methods, filtration, decontamination and fixing of contamination

  11. Experience of the remote dismantling of the Windscale advanced gas-cooled reactor and Windscale pile chimneys

    International Nuclear Information System (INIS)

    Wright, E.M.

    1993-01-01

    This paper gives brief descriptions of some of the remote dismantling work and equipment used on two large decommissioning projects: the BNFL Windscale Pile Chimneys Project (remote handling machine, waste packaging machine, remotely controlled excavator, remotely controlled demolition machine) and the AEA Windscale Advanced Gas-cooled Reactor Project (remote dismantling machine, operational waste, bulk removal techniques, semi-remote cutting operations)

  12. Hot laboratory in Saclay. Equipment and radio-metallurgy technique of the hot lab in Saclay. Description of hot cell for handling of plutonium salts. Installation of an hot cell

    International Nuclear Information System (INIS)

    Bazire, R.; Blin, J.; Cherel, G.; Duvaux, Y.; Cherel, G.; Mustelier, J.P.; Bussy, P.; Gondal, G.; Bloch, J.; Faugeras, P.; Raggenbass, A.; Raggenbass, P.; Fufresne, J.

    1959-01-01

    Describes the conception and installation of the hot laboratory in Saclay (CEA, France). The construction ended in 1958. The main aim of this laboratory is to examine fuel rods of EL2 and EL3 as well as nuclear fuel studies. It is placed in between both reactors. In a first part, the functioning and specifications of the hot lab are given. The different hot cells are described with details of the ventilation and filtration system as well as the waste material and effluents disposal. The different safety measures are explained: description of the radiation protection, decontamination room and personnel monitoring. The remote handling equipment is composed of cutting and welding machine controlled with manipulators. Periscopes are used for sight control of the operation. In a second part, it describes the equipment of the hot lab. The unit for an accurate measurement of the density of irradiated uranium is equipped with an high precision balance and a thermostat. The equipment used for the working of irradiated uranium is described and the time length of each operation is given. There is also an installation for metallographic studies which is equipped with a manipulation bench for polishing and cleaning surfaces and a metallographic microscope. X-ray examination of uranium pellets will also be made and results will be compared with those of metallography. The last part describes the hot cells used for the manipulation of plutonium salts. The plutonium comes from the reprocessing plant and arrived as a nitric solution. Thus these cells are used to study the preparation of plutonium fluorides from nitric solution. The successive operations needed are explained: filtration, decontamination and extraction with TBP, purification on ion exchangers and finally formation of the plutonium fluorides. Particular attention has been given to the description of the specifications of the different gloveboxes and remote handling equipment used in the different reaction steps and

  13. Gamma-ray spectrometry combined with acceptable knowledge (GSAK). A technique for characterization of certain remote-handled transuranic (RH-TRU) wastes. Part 2. Testing and results

    International Nuclear Information System (INIS)

    Hartwell, J.K.; McIlwain, M.E.

    2005-01-01

    Gamma-ray spectrometry combined with acceptable knowledge (GSAK) is a technique for the characterization of certain remote-handled transuranic (RH-TRU) wastes. GSAK uses gamma-ray spectrometry to quantify a portion of the fission product inventory of RH-TRU wastes. These fission product results are then coupled with calculated inventories derived from acceptable process knowledge to characterize the radionuclide content of the assayed wastes. GSAK has been evaluated and tested through several test exercises. These tests and their results are described; while the former paper in this issue presents the methodology, equipment and techniques. (author)

  14. Augmented virtualised reality-Applications and benefits in remote handling for fusion

    International Nuclear Information System (INIS)

    King, Ryan; Hamilton, David

    2009-01-01

    Over the last 10 years VR has been used at JET in an increasingly important role. It now finds use in various aspects of task preparation including planning, mock-up, training and task overview. It also plays an important role in actual operations where it is used to gain a more complete view of the work area. The JET VR implementation does not have on-line monitoring of the remote environment and the robot modelling has accuracy limitations, so this system cannot be used as the primary means of viewing. Work is currently underway with the aim of allowing such as system to run at ITER with full remote environment monitoring with high enough precision and accuracy so as to allow its use as the primary viewing method. This paper looks at how this augmented virtualised reality solution would be applied and considers some of the additional benefits AVR could have in remote handling for fusion.

  15. Remote waste handling at the Hot Fuel Examination Facility

    International Nuclear Information System (INIS)

    Vaughn, M.E.

    1982-01-01

    Radioactive solid wastes, some of which are combustible, are generated during disassembly and examination of irradiated fast-reactor fuel and material experiments at the Hot Fuel Examination Facility (HFEF). These wastes are remotely segregated and packaged in doubly contained, high-integrity, clean, retrievable waste packages for shipment to the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). This paper describes the equipment and techniques used to perform these operations

  16. Remote material handling in the Plutonium Immobilization Project. Revision 1

    International Nuclear Information System (INIS)

    Brault, J.R.

    2000-01-01

    With the downsizing of the US and Russian nuclear stockpiles, large quantities of weapons-usable plutonium in the US are being declared excess and will be disposed of by the Department of Energy Fissile Materials Disposition Program. To implement this program, DOE has selected the Savannah River Site (SRS) for the construction and operation of three new facilities: pit disassembly and conversion; mixed oxide fuel fabrication; and plutonium immobilization. The Plutonium Immobilization Project (PIP) will immobilize a portion of the excess plutonium in a hybrid ceramic and glass form containing high level waste for eventual disposal in a geologic repository. The PIP is divided into three distinct operating areas: Plutonium Conversion, First Stage Immobilization, and Second Stage Immobilization. Processing technology for the PIP is being developed jointly by the Lawrence Livermore National Laboratory and Westinghouse Savannah River Company. This paper will discuss development of the automated unpacking and sorting operations in the conversion area, and the automated puck and tray handling operations in the first stage immobilization area. Due to the high radiation levels and toxicity of the materials to be disposed of, the PIP will utilize automated equipment in a contained (glovebox) facility. Most operations involving plutonium-bearing materials will be performed remotely, separating personnel from the radiation source. Source term materials will be removed from the operations during maintenance. Maintenance will then be performed hands on within the containment using glove ports

  17. Remote connector development study

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1995-05-01

    Plutonium-uranium extraction (PUREX) connectors, the most common connectors used at the Hanford site, offer a certain level of flexibility in pipe routing, process system configuration, and remote equipment/instrument replacement. However, these desirable features have inherent shortcomings like leakage, high pressure drop through the right angle bends, and a limited range of available pipe diameters that can be connect by them. Costs for construction, maintenance, and operation of PUREX connectors seem to be very high. The PUREX connector designs include a 90 degree bend in each connector. This increases the pressure drop and erosion effects. Thus, each jumper requires at least two 90 degree bends. PUREX connectors have not been practically used beyond 100 (4 in.) inner diameter. This study represents the results of a survey on the use of remote pipe-connection systems in US and foreign plants. This study also describes the interdependence between connectors, remote handling equipment, and the necessary skills of the operators

  18. Handling trolley for Argonne M8, Pye Mo 1815, Pye Heavy Duty, etc. remote manipulators

    International Nuclear Information System (INIS)

    Roussel, E.; Labiche, M.; Chevallier, E.

    1962-01-01

    The removal and installation of remote manipulators and periscopes in hot cells are delicate operations requiring a specific handling trolley. This note describes the technical specifications of such a trolley having the following advantages: occupies a minimal space when not in use, easy and efficient fastening and monitoring, smooth moving of the remote manipulators during removal or installation, trolley stability and immobility during operation, requires only two operators

  19. Development of a telerobotic system for handling contaminated process equipment

    International Nuclear Information System (INIS)

    Fisher, J.J.; Ward, C.R.; Schuler, T.F.

    1987-01-01

    E. I. du Pont de Nemours and Company is evaluating a unique eight-degree-of-freedom Telerobot manipulator to perform size-reduction and material handling operations on contaminated process equipment at the Savannah River Plant (SRP). The Telerobot will be installed in the proposed Transuranic (TRU) Waste Processing Facility, which is scheduled to be operational by 1990. A full-scale prototype Telerobot, manufactured by GCA Corporation, St. Paul, MN is being tested with other process equipment in the Components Test Facility at the Savannah River Laboratory (SRL). All telerobotic operations required in the TRU Waste Facility such as crate unpacking, equipment dismantling, material size-reduction, and selected maintenance operations are being tested. This paper discusses the major mechanical and control features of the Telerobot system. Several system enhancements were added by SRL, including a new quick-hand-change coupling and expanded software control functions. The new software enables a system operator to perform both teleoperated and automatic tasks through several operating modes. These enhancements, as well as future mechanical, control system, and software features, are reviewed

  20. Treatment of plutonium-contaminated solid waste: a review of handling systems

    International Nuclear Information System (INIS)

    Meredith, B.E.; Hardy, A.R.

    1985-02-01

    Handling techniques are reviewed to identify those suitable for adaptation for use in transporting large items of redundant plutonium contaminated plant and equipment to a remotely operated size reduction facility, moving them into the facility, presenting them to size reduction equipment and loading the processed waste into drums. It is concluded that an integrated system based on a combination of slatted conveyors, roller tables, air transporters and manipulators, merits further consideration. An appropriate experimental programme is outlined. (author)

  1. Remote handling features of the Fusion Materials Irradiation Test (FMIT) facility

    International Nuclear Information System (INIS)

    Klos, D.B.; Wierman, R.W.; Kelly, V.P.; Yount, J.A.

    1980-01-01

    Initial design of the experimental system provided two modes of access to the test cells. The horizontal mode was the predominant one. However, as the design progressed unacceptable risks were identified that increased personnel exposure to radiation and decreased testing availability of the facility. Consequently, vertical-only access was adopted. Remote handling features of both design concepts are described including the technical basis for the transition from the first to the second concept

  2. A passive-active neutron device for assaying remote-handled transuranic waste

    International Nuclear Information System (INIS)

    Estep, R.J.; Coop, K.L.; Deane, T.M.; Lujan, J.E.

    1990-01-01

    A combined passive-active neutron assay device was constructed for assaying remote-handled transuranic waste. A study of matrix and source position effects in active assays showed that a knowledge of the source position alone is not sufficient to correct for position-related errors in highly moderating or absorbing matrices. An alternate function for the active assay of solid fuel pellets was derived, although the efficacy of this approach remains to be established

  3. DISPOSAL CONTAINER HANDLING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    E. F. Loros

    2000-06-30

    . This includes the primary hot cell bounded by the receiving area and WP transport exit air locks; and isolation doors at ATS, CTS, and Waste Package Remediation. The hot cell includes areas for welding, various staging, tilting, and WP transporter loading. There are associated operating galleries and equipment maintenance areas outside the hot cell. These areas operate concurrently to accommodate the DC/WP throughput rates and support system maintenance. The new DC preparation area is located in an unshielded structure. The handling equipment includes DC/WP bridge cranes, tilting stations, and horizontal transfer carts. The welding area includes DC/WP welders and staging stations. Welding operations are supported by remotely operated equipment including a bridge crane and hoists, welder jib cranes, welding turntables, and manipulators. WP transfer includes a transfer/decontamination and transporter load area. The transfer operations are supported by a remotely operated horizontal lifting system, decontamination system, decontamination and inspection manipulator, and a WP horizontal transfer cart. All handling operations are supported by a suite of fixtures including collars, yokes, lift beams, and lid attachments. Remote equipment is designed to facilitate decontamination and maintenance. Interchangeable components are provided where appropriate. Set-aside areas are included, as required, for fixtures and tooling to support off-normal and recovery operations. Semi-automatic, manual, and backup control methods support normal, maintenance, and recovery operations. The system interfaces with the ATS and CTS to provide empty and receive loaded DCs. The Waste Emplacement/Retrieval System interfaces are for loading/unloading WPs on/from the transporter. The system also interfaces with the Waste Package Remediation System for DC/WP repair. The system is housed, shielded, supported, and has ventilation boundaries by the Waste Handling Building (WHB). The system is ventilated

  4. Conceptual design for remote handling methods using the HIP process in the Calcine Immobilization Program

    International Nuclear Information System (INIS)

    Berry, S.M.; Cox, C.G.; Hoover, M.A.

    1994-03-01

    This report recommends the remote conceptual design philosophy for calcine immobilization using the hot isostatic press (HIP) process. Areas of remote handling operations discussed in this report include: (1) introducing the process can into the front end of the HIP process, (2) filling and compacting the calcine/frit mixture into the process can, (3) evacuating and sealing the process can, (4) non-destructive testing of the seal on the process can, (5) decontamination of the process can, (6) HIP furnace loading and unloading the process can for the HIPing operation, (7) loading an overpack canister with processed HIP cans, (8) sealing the canister, with associated non-destructive examination (NDE) and decontamination, and (9) handling canisters for interim storage at the Idaho Chemical Processing Plant (ICPP) located on the Idaho National Engineering Laboratory (INEL) site

  5. The remote handling of canisters containing nuclear waste in glass at the Savannah River Plant

    International Nuclear Information System (INIS)

    Callan, J.E.

    1986-01-01

    The Defense Waste Processing Facility (DWPF) is a complete production area being constructed at the Savannah River Plant for the immobilization of nuclear waste in glass. The remote handling of canisters filled with nuclear waste in glass is an essential part of the process of the DWPF at the Savannah River Plant. The canisters are filled with nuclear waste containing up to 235,000 curies of radioactivity. Handling and movement of these canisters must be accomplished remotely since they radiate up to 5000 R/h. Within the Vitrification Building during filling, cleaning, and sealing, canisters are moved using standard cranes and trolleys and a specially designed grapple. During transportation to the Glass Waste Storage Building, a one-of-a-kind, specially designed Shielded Canister Transporter (SCT) is used. 8 figs

  6. Multiuser remote access to distributed heterogeneous system of programmable logic based laboratory equipment for remote digital circuits design labs

    Directory of Open Access Journals (Sweden)

    Mikhail N. Yokhin

    2017-12-01

    Full Text Available The paper contains an analysis of perspective structures of software and hardware equipment of universal digital design laboratories with the purpose of enabling laboratory classes of digital circuit design to be taken remotely. Implementation characteristics and usage experience of some of those structures applied to labs on several hardware related courses of « Computer science and computer engineering» program in NRNU MEPhI are presented. The paper also considers different aspects of usage of remote access enabled laboratory which should be taken into account to substantiate laboratory configuration from technical and economical standpoints. To increase equipment usage efficiency an approach to group several distinct projects to place them on a single FPGA chip is proposed. The paper shows advisability and gives an example of parametrizable virtual stand for remote debugging of FPGA projects.

  7. The operational challenge of remote maintenance

    International Nuclear Information System (INIS)

    Forsythe, L.

    2015-01-01

    consideration when undertaking remote maintenance. This paper focuses on the technical methods employed for remote maintenance, describing the requirements of being able to maintain components and equipment in challenging environments using remote handling applications. Developing tasks for remote handling techniques right from the concept design stage, in order to reduce time and cost later in development and operation, especially when they have become irradiated and cannot be manually handled. (author)

  8. Laser welding and ablation cutting process for hydraulic connections by remote handling in the ITER diagnostic port plug

    International Nuclear Information System (INIS)

    Pak, S.; Kim, Y.; Park, K.Y.; Lee, K.D.; Cheon, M.S.; Lee, H.G.

    2010-01-01

    To assess hydraulic connections between subcomponents of the International Thermonuclear Experimental Reactor (ITER) diagnostic port plug, we investigated the laser welding and ablation cutting process, which can be applied to remote handling maintenance. In this study, laser ablation cutting, which vaporizes a small amount of solid material directly into gas by focusing a laser beam of high-density energy, is adopted in order to overcome the limitation of the normal laser cutting technology that the head should be placed as close to the work piece as possible to blow out melt metal at a distance. Complete cutting of a work piece is obtained by repetitive multi-passes of the laser beam. The welding and cutting process were tested on the sample work pieces and finally on a prototype of a hydraulic connection module for remote handling. The results showed that this process can be a promising candidate for hydraulic connections by remote handling. Furthermore the design of the hydraulic connection module has been updated to resolve some technical difficulties that were found during the test.

  9. Laser welding and ablation cutting process for hydraulic connections by remote handling in the ITER diagnostic port plug

    Energy Technology Data Exchange (ETDEWEB)

    Pak, S. [National Fusion Research Institute, 52 Eoeun-dong, Yuseong-gu, Daejeon (Korea, Republic of)], E-mail: paksunil@nfri.re.kr; Kim, Y.; Park, K.Y.; Lee, K.D. [Institute for Advanced Engineering, 633-2, Goan-ri, Baegam-myeon, Cheoin-gu, Yongin-si, Gyeonggi-do (Korea, Republic of); Cheon, M.S.; Lee, H.G. [National Fusion Research Institute, 52 Eoeun-dong, Yuseong-gu, Daejeon (Korea, Republic of)

    2010-04-15

    To assess hydraulic connections between subcomponents of the International Thermonuclear Experimental Reactor (ITER) diagnostic port plug, we investigated the laser welding and ablation cutting process, which can be applied to remote handling maintenance. In this study, laser ablation cutting, which vaporizes a small amount of solid material directly into gas by focusing a laser beam of high-density energy, is adopted in order to overcome the limitation of the normal laser cutting technology that the head should be placed as close to the work piece as possible to blow out melt metal at a distance. Complete cutting of a work piece is obtained by repetitive multi-passes of the laser beam. The welding and cutting process were tested on the sample work pieces and finally on a prototype of a hydraulic connection module for remote handling. The results showed that this process can be a promising candidate for hydraulic connections by remote handling. Furthermore the design of the hydraulic connection module has been updated to resolve some technical difficulties that were found during the test.

  10. Availability analysis of the ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Maruyama, Takahito; Noguchi, Yuto; Takeda, Nobukazu; Kakudate, Satoshi

    2015-01-01

    The ITER blanket remote handling system (BRHS) is required to replace 440 blanket first wall panels in a two-year maintenance period. To investigate this capability, an availability analysis of the system was carried out. Following the analysis procedure defined by the ITER organization, the availability analysis consists of a functional analysis and a reliability block diagram analysis. In addition, three measures to improve availability were implemented: procurement of spare parts, in-vessel replacement of cameras, and simultaneous replacement of umbilical cables. The availability analysis confirmed those measures improve the availability and capability of the BRHS to replace 440 blanket first wall panels in two years. (author)

  11. 76 FR 33277 - Proposed Approval of the Central Characterization Project's Remote-Handled Transuranic Waste...

    Science.gov (United States)

    2011-06-08

    ... disposal of TRU radioactive waste. As defined by the WIPP Land Withdrawal Act (LWA) of 1992 (Pub. L. 102... certification of the WIPP's compliance with disposal regulations for TRU radioactive waste [63 Federal Register... radioactive remote-handled (RH) transuranic (TRU) waste characterization program implemented by the Central...

  12. ORNL shielded facilities capable of remote handling of highly radioactive beta--gamma emitting materials

    International Nuclear Information System (INIS)

    Whitson, W.R.

    1977-09-01

    A survey of ORNL facilities having adequate shielding and containment for the remote handling of experimental quantities of highly radioactive beta-gamma emitting materials is summarized. Portions of the detailed descriptions of these facilities previously published in ORNL/TM-1268 are still valid and are repeated

  13. Development of remote automatic equipment for BWR power plants

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi

    1984-01-01

    The development of remote control, automatic equipment for nuclear power stations has been promoted to raise the rate of operation of plants by shortening regular inspection period, to improve the safety and reliability of inspection and maintenance works by mechanization, to reduce the radiation exposure dose of workers and to reduce the manpower required for works. The taking-off of control rod drives from reactors and fixing again have been mechanized, but the disassembling, cleaning, inspection and assembling of control rod drives are manually carried out. Therefore, Hitachi Ltd. has exerted effort to develop the automatic equipment for this purpose. The target of development, investigation, the construction and function of the equipment, the performance and the effect of adopting it are reported. The equipment for the volume reduction of spent fuel channel boxes and spent control rods is developed since these are major high level radioactive solid wastes, and their apparent volume is large. Also the target of development, investigated things, the construction and function of the equipment, the performance and the effect of adopting it are reported. (Kako, I.)

  14. Design considerations, tooling and equipment for remote in-service inspection of radioactive piping and pressure vessel systems

    International Nuclear Information System (INIS)

    Schmoker, D.S.; Swannack, D.L.

    1983-01-01

    In-Service Inspection programs are performed to monitor and verify the integrity of a nuclear power plant's primary pressure boundaries. Early detection of abnormal structural or material degradation could preclude serious damage to plant systems. This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  15. Development of HWVP melter/turntable components for canyon-remote maintenance and replacement

    International Nuclear Information System (INIS)

    Siemens, D.H.; Beary, M.M.; Berger, D.N.; Heath, W.O.; Larson, D.E.

    1985-03-01

    Remote operability and maintainability of vitrification equipment were assessed under shielded-cell conditions. The equipment tested will be applied to immobilize high-level and transuranic liquid waste slurries that resulted from plutonium production for defense weapons. Equipment tested included: (1) a turntable for handling waste canisters under the melter; (2) a removable discharge cone in the melter overflow section; (3) a thermocouple jumper that extends into a shielded cell; (4) remote instrument and electrical connectors; (5) remote, mechanical, and heat transfer aspects of the melter glass overflow section; (6) a reamer to clean out plugged nozzles in the melter top; (7) a closed circuit camera to view the melter interior; and (8) a device to retrieve samples of the glass product. 14 figs

  16. Remote technology in the spent fuel route in the UK

    International Nuclear Information System (INIS)

    Webster, A.W.

    1999-01-01

    Remote technologies employed in front end (commercial) reprocessing operations of metallic and oxide fuel at Sellafield in the UK are described. An overview of the transportation, fuel receiving and preparation facilities are given together with the remote technology developments employed to improve operations. It is concluded that the facilities and remote technology used within them are mature and based upon simple and robust principles. Remote operations and maintenance in these facilities is often easier than in many facilities downstream of the dissolution stage. Fuel design considerations for shearing and handling are described and it is concluded that advanced and higher burnup fuel can be accommodated by existing reprocessing and interim storage routes with current remote technologies. Two different storage systems are available from UK companies which use existing spent fuel handling technology/equipment. The pace of remote technology development is currently being set by the demands of other nuclear process areas such as decommissioning and plant clean out; these will spin-off into front end processes. (author)

  17. Synthetic viewing: Comprehensive work representation making remote work more transparent to the operator

    International Nuclear Information System (INIS)

    Leinemann, K.; Katz, F.; Knueppel, H.

    1994-01-01

    To support the operator remote handling a number of well-developed techniques is available like transmission of forces, movements, and dexterous skills in general using masterslave manipulators equipped with special tools. In addition several types of transporters are available to position manipulators and tools. But there is a serious bottle-neck in viewing: the number of cameras is restricted and the cameras may in most cases not be positioned as to provide sufficient information. In order to improve this situation an integration of closed-loop TV and artificial viewing by sensor controlled computer graphics has been introduced successfully by KfK at JET. This integrated viewing subsystem combines not only those two techniques by providing the two views but also enhances the conventional camera control by a computer graphics model-based control. Practical experience has shown that the concept of viewing needs to be extended. Just seeing where things are is insufficient for the operators to perform their remote handling task properly. More information is required about the status of all equipment pieces involved and about the status of the entire handling task. Viewing for remote handling applications needs to include the display of such status information in a suitable form

  18. Remote Handled Transuranic Sludge Retrieval Transfer And Storage System At Hanford

    International Nuclear Information System (INIS)

    Raymond, Rick E.; Frederickson, James R.; Criddle, James; Hamilton, Dennis; Johnson, Mike W.

    2012-01-01

    This paper describes the systems developed for processing and interim storage of the sludge managed as remote-handled transuranic (RH-TRU). An experienced, integrated CH2M HILL/AFS team was formed to design and build systems to retrieve, interim store, and treat for disposal the K West Basin sludge, namely the Sludge Treatment Project (STP). A system has been designed and is being constructed for retrieval and interim storage, namely the Engineered Container Retrieval, Transfer and Storage System (ECRTS)

  19. Remote Handled Transuranic Sludge Retrieval Transfer And Storage System At Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Raymond, Rick E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Frederickson, James R. [AREVA, Avignon (France); Criddle, James [AREVA, Avignon (France); Hamilton, Dennis [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Johnson, Mike W. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-10-18

    This paper describes the systems developed for processing and interim storage of the sludge managed as remote-handled transuranic (RH-TRU). An experienced, integrated CH2M HILL/AFS team was formed to design and build systems to retrieve, interim store, and treat for disposal the K West Basin sludge, namely the Sludge Treatment Project (STP). A system has been designed and is being constructed for retrieval and interim storage, namely the Engineered Container Retrieval, Transfer and Storage System (ECRTS).

  20. Remotely controlled large container disposal methodology

    International Nuclear Information System (INIS)

    Amir, S.J.

    1994-09-01

    Remotely Handled Large Containers (RHLC), also called drag-off boxes, have been used at the Hanford Site since the 1940s to dispose of large pieces of radioactively contaminated equipment. These containers are typically large steel-reinforced concrete boxes, which weigh as much as 40 tons. Because large quantities of high-dose waste can produce radiation levels as high as 200 mrem/hour at 200 ft, the containers are remotely handled (either lifted off the railcar by crane or dragged off with a cable). Many of the existing containers do not meet existing structural and safety design criteria and some of the transportation requirements. The drag-off method of pulling the box off the railcar using a cable and a tractor is also not considered a safe operation, especially in view of past mishaps

  1. Remote handling and robotic inspections of Palo Verde reactor vessel internals

    International Nuclear Information System (INIS)

    Ryder, W.

    1998-01-01

    Remote visual examinations and handling evolutions in high radiation field environments have required the use of radiation tolerant video systems. These systems involve significant expense and potentially require large envelope deployment structures. Recent events at Palo Verde including Upper Guide Structure damage and Reactor Vessel In-Service Inspections have provided opportunities for research, design and utilization of alternative approaches. Most significant of these, utilization of CCD modules with high magnification capabilities, have produced higher quality viewing, reduced maintenance expenditures, and rapid deployment intervals. (orig.) [de

  2. Implementation of remote equipment at TMI-2 [Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Giefer, D.; Jeffries, A.B.

    1988-01-01

    Each of the remote vehicles in use, or planned for use, at Three Mile Island Unit 2 (TMI-2) during the period from 1984 to the present had certain distinct common features. These were proven to be desirable for remote application in the TMI-2 environment. Proper implementation requires consideration of the following: control systems, rigging systems, power supplies, operator/support interface, maintenance concerns, viewing systems, contamination control, and communications. Design and component fabrication of these features allowed deployment of each of the remote devices. This paper discusses these systems and their impact for the use of remote mobile equipment at TMI-2. In most cases, the means of implementation dictated the design features of the devices

  3. Design for a Remote Monitoring Equipment of Krypton-85

    Institute of Scientific and Technical Information of China (English)

    LUXue-sheng; LIUGuo-rong; YEFeng; JINHui-min; TANGPei-jia

    2003-01-01

    A prototype equipment for monitoring Krypton-85 in situ is designed and set up. A series of relevant software is also developed for remote control, data acquirement and data analysis. Weight of the system is about 300 kg, which is composed of NaI(T1) detector, digi DART, Marillin measurement container and lead shield. The whole system is placed on a homemade go-cart.

  4. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  5. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  6. SRV-automatic handling device

    International Nuclear Information System (INIS)

    Yamada, Koji

    1987-01-01

    Automatic handling device for the steam relief valves (SRV's) is developed in order to achieve a decrease in exposure of workers, increase in availability factor, improvement in reliability, improvement in safety of operation, and labor saving. A survey is made during a periodical inspection to examine the actual SVR handling operation. An SRV automatic handling device consists of four components: conveyor, armed conveyor, lifting machine, and control/monitoring system. The conveyor is so designed that the existing I-rail installed in the containment vessel can be used without any modification. This is employed for conveying an SRV along the rail. The armed conveyor, designed for a box rail, is used for an SRV installed away from the rail. By using the lifting machine, an SRV installed away from the I-rail is brought to a spot just below the rail so that the SRV can be transferred by the conveyor. The control/monitoring system consists of a control computer, operation panel, TV monitor and annunciator. The SRV handling device is operated by remote control from a control room. A trial equipment is constructed and performance/function testing is carried out using actual SRV's. As a result, is it shown that the SRV handling device requires only two operators to serve satisfactorily. The required time for removal and replacement of one SRV is about 10 minutes. (Nogami, K.)

  7. Hands on versus remote techniques in waste management and decommissioning

    International Nuclear Information System (INIS)

    Asquith, J.D.

    1994-01-01

    The nuclear industry has many requirements for planned and uplanned physical interactions with radioactive materials or their environment. In each case a choice must be made as to whether the interaction should be made directly by the operator using a 'hands on' technique, wearing any necessary protective clothing, or by entirely remote techniques. In facilities where remote handling equipment has already been provided and planned for, remote techniques are usually the obvious choice. However in radioactive waste management and decommissioning there are many cases where unexpected requirements emerge, often for relatively short term activities, where the choice is more complex. This paper takes a look at the various factors which should be considered in order to make these decisions, an overview of the types of remote equipment available in the UK and some examples of the benefits which have resulted when remote techniques have been adopted in Britain

  8. Fusion reactor handling operations with cable-driven parallel robots

    Energy Technology Data Exchange (ETDEWEB)

    Izard, Jean-Baptiste, E-mail: jeanbaptiste.izard@tecnalia.com; Michelin, Micael; Baradat, Cédric

    2015-10-15

    Highlights: • CDPR allow 6DOF positioning of loads using cable as links without payload swag. • Conceptual design of a CDPR for carrying and positioning tokamak sectors is given. • A CDPR for threading stellarator coils (6D trajectory following) is provided. • Both designs are capable of fullfilling the required precision without tooling. - Abstract: Cable-driven parallel robots (CDPR) are in their concept cranes with inclined cables which allow control of all the degrees of freedom of its payload, and therefore stability of all the degrees of freedom, including rotations. The workspace of a CDPR is only limited by the length of the cables, and the payload capacity related to the mass of the whole robot is very important. Besides, the control being based on kinematic models, the behavior of a CDPR is really that of a robot capable of automated trajectories or remote handling. The present paper gives a presentation of two use case studies based on some of the assembly phases and remote handling actions as designed for the recent fusion machines. Based on the use cases already in place in fusion reactor baselines, the opportunity of using CDPR for assembly of structural elements and coils is discussed. Finally, prospects for remote handling equipment from the reactor in hot cells are envisioned based on current CDPR research.

  9. Synthetic viewing: comprehensive work representation, making remote work clearer to the operator

    International Nuclear Information System (INIS)

    Leinemann, K.; Katz, F.; Knueppel, H.; Olbrich, W.; Maisonnier, D.

    1995-01-01

    Maintenance work in fusion plants such as the ITER plant will be carried out fully remotely, without any direct view on to the work scene. The basic sources of information about the state of the work are video monitors. In a first development step, this viewing channel was enhanced by three-dimensional computer graphics controlled by signals of motion sensors (such as joint angle sensors) of the real maintenance devices. However, experience has shown that more information is required about the status of all pieces of equipment involved and about the status of the entire handling task, if the work is to be done properly. Viewing for remote handling applications needs to include the display of such status information in a suitable form. Of special importance in this sense is the representation of the work procedures on the computer display, enabling the operator to grasp at a glance the actual state of the work and the details about the subtask to be executed next. The tool providing this ''synthetic'' viewing but also task-suited to planning, training and controlling support for the operator is the remote handling workstation. The prototype of a remote handling workstation was successfully used in the first complete Karlsruhe experiment for in-torus handling. (orig.)

  10. Remote-Handled Transuranic Waste Content Codes (RH-Trucon)

    International Nuclear Information System (INIS)

    2006-01-01

    The Remote-Handled Transuranic (RH-TRU) Content Codes (RH-TRUCON) document describes the inventory of RH-TRU waste within the transportation parameters specified by the Remote-Handled Transuranic Waste Authorized Methods for Payload Control (RH-TRAMPAC). The RH-TRAMPAC defines the allowable payload for the RH-TRU 72-B. This document is a catalog of RH-TRU 72-B authorized contents by site. A content code is defined by the following components: (1) A two-letter site abbreviation that designates the physical location of the generated/stored waste (e.g., ID for Idaho National Laboratory [INL]). The site-specific letter designations for each of the sites are provided in Table 1. (2) A three-digit code that designates the physical and chemical form of the waste (e.g., content code 317 denotes TRU Metal Waste). For RH-TRU waste to be transported in the RH-TRU 72-B, the first number of this three-digit code is ''3''. The second and third numbers of the three-digit code describe the physical and chemical form of the waste. Table 2 provides a brief description of each generic code. Content codes are further defined as subcodes by an alpha trailer after the three-digit code to allow segregation of wastes that differ in one or more parameter(s). For example, the alpha trailers of the subcodes ID 322A and ID 322B may be used to differentiate between waste packaging configurations. As detailed in the RH-TRAMPAC, compliance with flammable gas limits may be demonstrated through the evaluation of compliance with either a decay heat limit or flammable gas generation rate (FGGR) limit per container specified in approved content codes. As applicable, if a container meets the watt*year criteria specified by the RH-TRAMPAC, the decay heat limits based on the dose-dependent G value may be used as specified in an approved content code. If a site implements the administrative controls outlined in the RH-TRAMPAC and Appendix 2.4 of the RH-TRU Payload Appendices, the decay heat or FGGR

  11. Automated handling for SAF batch furnace and chemistry analysis operations

    International Nuclear Information System (INIS)

    Bowen, W.W.; Sherrell, D.L.; Wiemers, M.J.

    1981-01-01

    The Secure Automated Fabrication Program is developing a remotely operated breeder reactor fuel pin fabrication line. The equipment will be installed in the Fuels and Materials Examination Facility being constructed at Hanford, Washington. Production is scheduled to start in mid-1986. The application of small pneumatically operated industrial robots for loading and unloading product into and out of batch furnaces and for distribution and handling of chemistry samples is described

  12. High gamma-rays irradiation tests of critical components for ITER (International Thermonuclear Experimental Reactor) in-vessel remote handling system

    International Nuclear Information System (INIS)

    Obara, Kenjiro; Kakudate, Satoshi; Oka, Kiyoshi

    1999-02-01

    In ITER, the in-vessel remote handling is inevitably required to assemble and maintain the activated in-vessel components due to deuterium and tritium operation. Since the in-vessel remote handling system has to be operated under the intense of gamma ray irradiation, the components of the remote handling system are required to have radiation hardness so as to allow maintenance operation for a sufficient length of time under the ITER in-vessel environments. For this, the Japan, European and Russian Home Teams have extensively conducted gamma ray irradiation tests and quality improvements including optimization of material composition through ITER R and D program in order to develop radiation hard components which satisfy the doses from 10 MGy to 100 MGy at a dose rate of 1 x 10 6 R/h (ITER R and D Task: T252). This report describes the latest status of radiation hard component development which has been conducted by the Japan Home Team in the ITER R and D program. The number of remote handling components tested is about seventy and these are categorized into robotics (Subtask 1), viewing system (Subtask 2) and common components (Subtask 3). The irradiation tests, including commercial base products for screening, modified products and newly developed products to improve the radiation hardness, were carried out using the gamma ray irradiation cells in Takasaki Establishment, JAERI. As a result, the development of the radiation hard components which can be tolerable for high temperature and gamma radiation has been well progressed, and many components, such as AC servo motor with ceramics insulated wire, optical periscope and CCD camera, have been newly developed. (author)

  13. Progress on the interface between UPP and CPRHS (Cask and Plug Remote Handling System) tractor/gripping tool for ITER

    International Nuclear Information System (INIS)

    Rosa, Elena V.; Rios, Luis; Queral, Vicente

    2013-01-01

    Highlights: ► UPP interface requirements in the plug RH extraction/insertion for ITER. ► Analyze of maximum misalignment between port duct and port cell. ► Friction study between plug skids and VV port/ramp rails during the plug transfer. ► Definition of the tolerance in the plug skids to avoid the plug jamming. ► Concepts of gripping tools based on one gripping point and avoiding force feedback. -- Abstract: EFDA finances a training programme called Goal Oriented Training Programme for Remote Handling (GOT RH), whose goal is to train engineers in Remote Handling for ITER. As part of this training programme, the conceptual design of the mechanical interface between Upper Port Plug (UPP) and Cask and Plug Remote Handling System (CPRHS) as well as the conceptual design of the needed tools for UPP Remote Handling is carried out. The paper presents the conceptual design of the UPP/Gripping Tool Interface. This includes the conceptual design of the gripping tool for introducing/removing the UPP in/from the ITER port and the mechanical features on both sides of the UPP/Gripping Tool Interface (e.g. alignment features, mechanical connectors, fasteners). In order to develop the design of the interface between UPP and CPRHS it is necessary to first identify the functional requirements of the Transfer Cask System (TCS) and the CPRHS, such as required degrees of freedom (DoF), required performances of system, geometrical constraints, loading conditions, alignment requirements, RAMI requirements. These requirements are the input data for the design of the interface between UPP and gripping tool and some of them are also described in the paper

  14. High gamma-rays irradiation tests of critical components for ITER (International Thermonuclear Experimental Reactor) in-vessel remote handling system

    Energy Technology Data Exchange (ETDEWEB)

    Obara, Kenjiro; Kakudate, Satoshi; Oka, Kiyoshi [Department of Fusion Engineering Research, Naka Fusion Research Establishment, Japan Atomic Energy Research Institute, Naka, Ibaraki (Japan)] [and others

    1999-02-01

    In ITER, the in-vessel remote handling is inevitably required to assemble and maintain the activated in-vessel components due to deuterium and tritium operation. Since the in-vessel remote handling system has to be operated under the intense of gamma ray irradiation, the components of the remote handling system are required to have radiation hardness so as to allow maintenance operation for a sufficient length of time under the ITER in-vessel environments. For this, the Japan, European and Russian Home Teams have extensively conducted gamma ray irradiation tests and quality improvements including optimization of material composition through ITER R and D program in order to develop radiation hard components which satisfy the doses from 10 MGy to 100 MGy at a dose rate of 1 x 10{sup 6} R/h (ITER R and D Task: T252). This report describes the latest status of radiation hard component development which has been conducted by the Japan Home Team in the ITER R and D program. The number of remote handling components tested is about seventy and these are categorized into robotics (Subtask 1), viewing system (Subtask 2) and common components (Subtask 3). The irradiation tests, including commercial base products for screening, modified products and newly developed products to improve the radiation hardness, were carried out using the gamma ray irradiation cells in Takasaki Establishment, JAERI. As a result, the development of the radiation hard components which can be tolerable for high temperature and gamma radiation has been well progressed, and many components, such as AC servo motor with ceramics insulated wire, optical periscope and CCD camera, have been newly developed. (author)

  15. Integration of transport and handling equipment at CERN criteria to satisfy operational needs and safety aspects

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2004-01-01

    Within the last 4 years TS-IC-HM (former ST-HM group) integrated about 150 transport and handling supplies including 29 cranes, 20 fork lift trucks, 60 tunnel vehicles. Most of these are standardised supplies, but very often special functionality has been implemented and the complexity of the equipment has been increased. With the Rocla cryo-dipol transporters even prototype equipment was integrated that had been specially designed for CERN. This paper discusses the differences regarding the actions that have to be performed when the different kind of equipment have to be integrated.

  16. Installation of remote-handling typed EBSD-OIM analyzer for heavy irradiated reactor materials

    International Nuclear Information System (INIS)

    Kato, Yoshiaki; Takada, Fumiki; Ohmi, Masao; Nakagawa, Tetsuya; Miwa, Yukio

    2008-06-01

    The remote-handling typed EBSD-OIM analyzer for heavy irradiated reactor materials was installed in the JMTR hot laboratory at the first time in the world. The analyzer is used to study on IASCC (irradiation assisted stress corrosion cracking) or IGSCC (inter granular stress corrosion cracking) in reactor materials. This report describes the measurement procedure, the measured results and the operating experiences on the analyzer in the JMTR hot laboratory. (author)

  17. The development and evaluation of a stereoscopic television system for remote handling

    International Nuclear Information System (INIS)

    Dumbreck, A.A.; Murphy, S.P.; Smith, C.W.

    1990-01-01

    This paper describes the development and evaluation of a stereoscopic television system at Harwell Laboratory. The theory of stereo image geometry is outlined, and criteria for the matching of stereoscopic pictures are given. A stereoscopic television system designed for remote handling tasks has been produced, it provides two selectable angles of view and variable convergence, the display is viewed via polarizing spectacles. Evaluations have indicated improved performance with no problems of operator fatigue over a wide range of applications. (author)

  18. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  19. The Design and Implementation of the Remote Centralized-Monitoring System of Well-Control Equipment Based on RFID Technique

    Directory of Open Access Journals (Sweden)

    Luo Bin

    2017-01-01

    Full Text Available At present, in domestic for the management of well control equipment continue to the traditional way of nameplates identifies and paper-based registration, there are many issues like the separation of data information of device, easy lose, difficult query, confused management and many other problems, which will make the problem device into the well field, and then resulting in well control runaway drilling accident. To solve the above problems, this paper put forward to the integrated remote centralized-monitoring management mode of the well-control equipment. Taking the advantages of IOT technology, adopting the RFID technology, and combining with the remote transmission, this paper designs the remote centralized-monitoring system of well-control equipment based on RFID, which realizes the intelligent management of well-control equipment and meets the actual demand of the well-control equipment safe use and timely scheduling, and it has the ability of field application.

  20. Selected solutions and design features from the design of remotely handled filters and the technology of remote filter handling. Previous operating experience with these components in the PASSAT facility

    International Nuclear Information System (INIS)

    Jannakos, K.; Lange, W.; Potgeter, G.; Furrer, J.; Wilhelm, J.G.

    1981-01-01

    In a prototype filter offgas cleaning system for reprocessing plants (PASSAT) built at the Karlsruhe Nuclear Research Center a fullscale filter cell with remotely handled filters for aerosol and iodine removal and the corresponding remote handling systems for exchange, bagging out, packaging and disposal of spent filter elements has been installed and run in trial operation since July 1978. The filters and the replacement techniques have been tested for the past two years or so and so far have always worked satisfactory over the test period involving some 150 replacement events. Neither wear nor corrosion phenomena were found in the filter housings and the replacement systems. The seals and clamping devices were selected so that during operation the prescribed leak rates of -3 Torr l/s were always maintained on the filter lid, the seat of the filter element and the cell lock. The total clamping loads for the filter element and the filter lid amount to approx. 20 kN. The force necessary to separate the filter element from the filter housing is approx. 3.5 kN. No ruptures of seals or gaskets were to be detected. The design of the filters and of the handling systems has been found satisfactorily in the cold test operation so far and can be recommended for use in nuclear facilities. In all experiments conducted until now PASSAT has worked without any failure. All operating data required in the specifications were met in the test period. The maximum pressure loss in the system with loaded filter elements amounts to some 3000 mm of water. After operation with iodine and NO/sub x/, plant components exposed to 100% relative humidity and condensate showed corrosion

  1. Ex-vessel remote maintenance development plans for the Burning Plasma Experiment

    International Nuclear Information System (INIS)

    Burgess, T.W.; Davis, F.C.

    1991-01-01

    Remote maintenance (RM) is fundamental to the basic design requirements of the Burning Plasma Experiment (BPX), and an extensive RM development and demonstration program is planned to meet these requirements. The program first draws from the experience base that exists in the fission community and Europe's Joint European Torus (JET) Project. Successful solutions are applied where possible and, in many cases, improved in order to achieve the performance demanded by a multiyear program that must be capable of efficiently executing RM procedures. Early, concurrent efforts in the design and fabrication of prototype remote handling (RH) equipment, remote tooling, and maintainable machine components will precede an extensive use of mock-up equipment in order to test, develop, and demonstrate the technology. 7 refs,. 5 figs

  2. Progress in the conceptual design of the ITER cask and plug remote handling system

    Energy Technology Data Exchange (ETDEWEB)

    Locke, Darren, E-mail: darren.locke@f4e.europa.eu [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); González Gutiérrez, Carmen; Damiani, Carlo [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Friconneau, Jean-Pierre; Martins, Jean-Pierre [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2014-10-15

    Highlights: • The CPRHS is a complex system with a significant number of complicated interfaces. • Significant effort is being made to ensure that the system requirements are clearly defined. • This solution relates to planned operations and also anticipation of rescue operations. • With the CPRHS performing a safety function process control is being put in place. • All these factors will have a significant impact on the success of the CPRHS. - Abstract: One function of the ITER remote maintenance system is the transportation of in-vessel components and remote handling systems to and from the vacuum vessel and docking stations in the Hot Cell via dedicated galleries and lift. The cask and plug remote handling system (CPRHS) has been adopted as the solution to provide this nuclear confinement and transportation. This paper discusses the development of the conceptual design to-date and presents the processes being implemented to effectively control the subsequent CPRHS development. The CPRHS is a complex suite of systems with a significant number of interfaces with other ITER systems. Significant effort is being made to ensure that the system requirements are comprehensively defined and carefully managed and a feasible solution is developed – including planned and rescue operations. With the CPRHS performing a critical confinement function appropriate processes are being put in place to control the system development of the CPRHS. The expectation is that the combination of these factors will have a significant impact on the successful implementation of the CPRHS.

  3. Progress in the conceptual design of the ITER cask and plug remote handling system

    International Nuclear Information System (INIS)

    Locke, Darren; González Gutiérrez, Carmen; Damiani, Carlo; Friconneau, Jean-Pierre; Martins, Jean-Pierre

    2014-01-01

    Highlights: • The CPRHS is a complex system with a significant number of complicated interfaces. • Significant effort is being made to ensure that the system requirements are clearly defined. • This solution relates to planned operations and also anticipation of rescue operations. • With the CPRHS performing a safety function process control is being put in place. • All these factors will have a significant impact on the success of the CPRHS. - Abstract: One function of the ITER remote maintenance system is the transportation of in-vessel components and remote handling systems to and from the vacuum vessel and docking stations in the Hot Cell via dedicated galleries and lift. The cask and plug remote handling system (CPRHS) has been adopted as the solution to provide this nuclear confinement and transportation. This paper discusses the development of the conceptual design to-date and presents the processes being implemented to effectively control the subsequent CPRHS development. The CPRHS is a complex suite of systems with a significant number of interfaces with other ITER systems. Significant effort is being made to ensure that the system requirements are comprehensively defined and carefully managed and a feasible solution is developed – including planned and rescue operations. With the CPRHS performing a critical confinement function appropriate processes are being put in place to control the system development of the CPRHS. The expectation is that the combination of these factors will have a significant impact on the successful implementation of the CPRHS

  4. Versatile cable handling mechanisms for remote operator control

    Energy Technology Data Exchange (ETDEWEB)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D. [Portech Ltd., Portsmouth (United Kingdom)

    1996-12-31

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author).

  5. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author)

  6. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other, between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (UK)

  7. Integration of remote refurbishment performed on ITER components

    Energy Technology Data Exchange (ETDEWEB)

    Dammann, A., E-mail: alexis.dammann@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Antola, L. [AMEC, 31 Parc du Golf, CS 90519, 13596 Aix en Provence (France); Beaudoin, V. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Dremel, C. [Westinghouse, Electrique France/Astare, 122 Avenue de Hambourg, 13008 Marseille (France); Evrard, D. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Lemée, A. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Levesy, B.; Pitcher, C.S. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2015-10-15

    Highlights: • System engineering approach to consolidate requirements to modify the layout of the Hot Cell. • Illustration of the loop between requirement and design. • Verification process. - Abstract: Internal components of the ITER Tokamak are replaced and transferred to the Hot Cell by remote handling equipment. These components include port plugs, cryopumps, divertor cassettes, blanket modules, etc. They are brought to the refurbishment area of the ITER Hot Cell Building for cleaning and maintenance, using remote handling techniques. The ITER refurbishment area will be unique in the world, when considering combination of size, quantity of complex component to refurbish in presence of radiation, activated dust and tritium. The refurbishment process to integrate covers a number of workstations to perform specific remote operations fully covered by a mast on crane system. This paper describes the integration of the Refurbishment Area, explaining the functions, the methodology followed, some illustrations of trade-off and safety improvements.

  8. Remote handling requirements and considerations for D-T fusion reactors

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1984-01-01

    This paper presents an overview of the maintenance considerations for next-generation fusion reactors. It draws upon the work done at the Fusion Engineering Design Center over the past several years in the conceptual development of tokamaks and tandem mirrors. It specifically addresses the maintenance philosophy adopted for these devices, the configuration development using a modular design approach, scheduled and unscheduled maintenance operations, assembly and disassembly scenarios for component replacements, maintenance equipment requirements, and the operating availability of these devices. In addition, recent work on the development of a totally remote tokamak configuration is presented

  9. Remote handling requirements and considerations for D-T fusion reactors

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1984-01-01

    This paper an overview of the maintenance considerations of next-generation fusion reactors. It draws upon the work done at the Fusion Engineering Design Center over the past several years in the conceptual development of tokamaks and tandem mirrors. It specifically addresses the maintenance philosophy adopted for these devices, the configuration development using a modular design approach, scheduled and unscheduled maintenance operations, assembly and disassembly scenarios for component replacements, maintenance equipment requirements, and the operating availability of these devices. In addition, recent work on the development of a totally remote tokamak configuration is presented

  10. Preventive maintenance basis: Volume 21 -- HVAC, air handling equipment. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 21 of the report provides a program of PM tasks suitable for application to HVAC-Air Handling Equipment. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  11. Equipment experience in a radioactive LFCM [liquid-fed ceramic melter] vitrification facility

    International Nuclear Information System (INIS)

    Holton, L.K. Jr.; Dierks, R.D.; Sevigny, G.J.; Goles, R.W.; Surma, J.E.; Thomas, N.M.

    1986-11-01

    Since October 1984, the Pacific Northwest Laboratory (PNL) has operated a pilot-scale radioactive liquid-fed ceramic melter (RLFCM) vitrification process in shielded manipulator hot cells. This vitrification facility is being operated for the Department of Energy (DOE) to remotely test vitrification equipment components in a radioactive environment and to develop design and operation data that can be applied to production-scale projects. This paper summarizes equipment and process experience obtained from the operations of equipment systems for waste feeding, waste vitrification, canister filling, canister handling, and vitrification off-gas treatment

  12. Remotely replaceable fuel and feed nozzles for the NWCF calciner vessel

    International Nuclear Information System (INIS)

    Fletcher, R.D.; Carter, J.A.; May, K.W.

    1978-01-01

    The development and testing of remotely replaceable fuel and feed nozzles for calcination of liquid radioactive wastes in the calciner vessel of the New Waste Calcining Facility (NWCF) being built at the Idaho National Engineering Laboratory are described. A complete fuel nozzle assembly was fabricated and tested at the Remote Maintenance Development Facility to evolve design refinements, identify required support equipment, and develop handling techniques. The design also provided for remote replacement of the nozzle support carriage and adjacent feed and fuel pipe loops using two pairs of master-slave manipulators

  13. Improvement of remote control system of automatic ultrasonic equipment for inspection of reactor pressure vessel

    International Nuclear Information System (INIS)

    Cheong, Yong Moo; Jung, H. K.; Joo, Y. S.; Koo, K. M.; Hyung, H.; Sim, C. M.; Gong, U. S.; Kim, S. H.; Lee, J. P.; Rhoo, H. C.; Kim, M. S.; Ryoo, S. K.; Choi, C. H.; Oh, K. I.

    1999-12-01

    One of the important issues related to the nuclear safety is in-service inspection of reactor pressure vessel (RPV). A remote controlled automatic ultrasonic method is applied to the inspection. At present the automatic ultrasonic inspection system owned by KAERI is interrupted due to degradation of parts. In order to resume field inspection new remote control system for the equipment was designed and installed to the existing equipment. New ultrasonic sensors and their modules for RPV inspection were designed and fabricated in accordance with the new requirements of the inspection codes. Ultrasonic sensors were verified for the use in the RPV inspection. (author)

  14. Development of a Remote Handling Robot for the Maintenance of an ITER-Like D-Shaped Vessel

    Directory of Open Access Journals (Sweden)

    Peihua Chen

    2014-01-01

    Full Text Available Robotic operation is one of the major challenges in the remote maintenance of ITER vacuum vessel (VV and future fusion reactors as inner operations of Tokamak have to be done by robots due to the internal adverse conditions. This paper introduces a novel remote handling robot (RHR for the maintenance of ITER-like D-shaped vessel. The modular designed RHR, which is an important part of the remote handling system for ITER, consists of three parts: an omnidirectional transfer vehicle (OTV, a planar articulated arm (PAA, and an articulated teleoperated manipulator (ATM. The task of RHR is to carry processing tools, such as the viewing system, leakage detector, and electric screwdriver, to inspect and maintain the components installed inside the D-shaped vessel. The kinematics of the OTV, as well as the kinematic analyses of the PAA and ATM, is studied in this paper. Because of its special length and heavy payload, the dynamics of the PAA is also investigated through a dynamic simulation system based on robot technology middleware (RTM. The results of the path planning, workspace simulations, and dynamic simulation indicate that the RHR has good mobility together with satisfying kinematic and dynamic performances and can well accomplish its maintenance tasks in the ITER-like D-shaped vessel.

  15. Safety Analysis of 'Older/Aged' Handling and Transportation Equipment for Heavy Loads, Radioactive Waste and Materials in Accordance with German Nuclear Standards KTA 3902, 3903 and 3905

    International Nuclear Information System (INIS)

    Macias, P.; Prucker, E.; Stang, W.

    2006-01-01

    The purpose of this paper is to present a general safety analysis of important handling and transportation processes and their related equipment ('load chains' consisting of cranes, load-bearing equipment and load-attaching points). This project was arranged by the responsible Bavarian ministry for environment, health and consumer protection (StMUGV) in agreement with the power plant operators of all Bavarian nuclear power plants to work out potential safety improvements. The range of the equipment (e.g. reactor building, crane, refuelling machine, load-bearing equipment and load-attaching points) covers the handling and transportation of fuel elements (e. g. with fuel flasks), heavy loads (e.g. reactor pressure vessel closure head, shielding slabs) and radioactive materials and waste (e.g. waste flasks, control elements, fuel channels, structure elements). The handling equipment was subjected to a general safety analysis taking into account the ageing of the equipment and the progress of standards. Compliance with the current valid requirements of the state of science and technology as required by German Atomic Act and particularly of the nuclear safety KTA-standards (3902, 3903 and 3905) was examined. The higher protection aims 'safe handling and transportation of heavy loads and safe handling of radioactive materials and waste' of the whole analysis are to avoid a criticality accident, the release of radioactivity and inadmissible effects on important technical equipment and buildings. The scope of the analysis was to check whether these protection aims were fulfilled for all important technical handling and transportation processes. In particularly the design and manufacturing of the components and the regulations of the handling itself were examined. (authors)

  16. Interactive virtual mock-ups for Remote Handling compatibility assessment of heavy components

    Energy Technology Data Exchange (ETDEWEB)

    Oosterhout, J. van, E-mail: j.vanoosterhout@differ.nl [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M.; Koning, J.F. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk 6 (Netherlands); Ronden, D.M.S.; Baar, M. de [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands)

    2014-10-15

    Highlights: •Specific ITER components require RHCA on hardware mock-ups. •Hardware mock-ups are expensive and have a long lead time. •Interactive Virtual Reality mock-ups are readily available and easily adapted. •This paper analysis and proposes improvements to simulator capabilities. -- Abstract: ITER standards Tesini (2009) require hardware mock-ups to validate the Remote Handling (RH) compatibility of RH class 1- and critical class 2-components. Full-scale mock-ups of large ITER components are expensive, have a long lead time and lose their relevance in case of design changes. Interactive Virtual Reality simulations with real time rigid body dynamics and contact interaction allow for RH Compatibility Assessment during the design iterations. This paper explores the use of interactive virtual mock-ups to analyze the RH compatibility of heavy component handling and maintenance. It infers generic maintenance operations from the analysis and proposes improvements to the simulator capabilities.

  17. Interactive virtual mock-ups for Remote Handling compatibility assessment of heavy components

    International Nuclear Information System (INIS)

    Oosterhout, J. van; Heemskerk, C.J.M.; Koning, J.F.; Ronden, D.M.S.; Baar, M. de

    2014-01-01

    Highlights: •Specific ITER components require RHCA on hardware mock-ups. •Hardware mock-ups are expensive and have a long lead time. •Interactive Virtual Reality mock-ups are readily available and easily adapted. •This paper analysis and proposes improvements to simulator capabilities. -- Abstract: ITER standards Tesini (2009) require hardware mock-ups to validate the Remote Handling (RH) compatibility of RH class 1- and critical class 2-components. Full-scale mock-ups of large ITER components are expensive, have a long lead time and lose their relevance in case of design changes. Interactive Virtual Reality simulations with real time rigid body dynamics and contact interaction allow for RH Compatibility Assessment during the design iterations. This paper explores the use of interactive virtual mock-ups to analyze the RH compatibility of heavy component handling and maintenance. It infers generic maintenance operations from the analysis and proposes improvements to the simulator capabilities

  18. State and outlooks of remote handling and automation techniques use for industrial radioactive operations

    International Nuclear Information System (INIS)

    Guilloteau, R.; Le Guennec, R.; Dumond, S.

    1981-01-01

    Handling in reactors mainly concerns charging and discharging operations and inspection. Specific means are being developed for each operation, with an increasing degree of automation. This serves to reduce exposure of personnel. However, the development of these means conflicts in certain cases with the original plant design, which did not provide for remote maintenance. With regard to fuel reprocessing, handling at the processing level is becoming increasingly automated. The difficulties lie principally in maintenance and waste conditioning operations. These involve less specialized means than is the case with reactors and can only be automated to a limited extent, save in exceptional cases. The greatest progress will be achieved by laying down stringent maintenance principles and taking them into consideration at the design stage

  19. Improvement of remote control system of automatic ultrasonic equipment for inspection of reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Cheong, Yong Moo; Jung, H. K.; Joo, Y. S.; Koo, K. M.; Hyung, H.; Sim, C. M.; Gong, U. S.; Kim, S. H.; Lee, J. P.; Rhoo, H. C.; Kim, M. S.; Ryoo, S. K.; Choi, C. H.; Oh, K. I

    1999-12-01

    One of the important issues related to the nuclear safety is in-service inspection of reactor pressure vessel (RPV). A remote controlled automatic ultrasonic method is applied to the inspection. At present the automatic ultrasonic inspection system owned by KAERI is interrupted due to degradation of parts. In order to resume field inspection new remote control system for the equipment was designed and installed to the existing equipment. New ultrasonic sensors and their modules for RPV inspection were designed and fabricated in accordance with the new requirements of the inspection codes. Ultrasonic sensors were verified for the use in the RPV inspection. (autho0008.

  20. Potential uses of remote handling and robotic techniques in the back end of the fuel cycle

    International Nuclear Information System (INIS)

    Reynolds, N.P.; Tabe, T.; Fenton, N.; Baumgartner, P.

    1984-01-01

    Atomic Energy of Canada Limited (AECL) is actively conducting research on used fuel immobilization, used fuel reprocessing, and nuclear fuel waste immobilization and disposal. This paper attempts to identify potential uses of robotics and remote handling techniques in these areas, where their adoption could lead to significant processing, economic and safety advantages

  1. Experience with procuring, deploying and maintaining hardware at remote co-location centre

    International Nuclear Information System (INIS)

    Bärring, O; Bonfillou, E; Clement, B; Santos, M Coelho Dos; Dore, V; Gentit, A; Grossir, A; Salter, W; Valsan, L; Xafi, A

    2014-01-01

    In May 2012 CERN signed a contract with the Wigner Data Centre in Budapest for an extension to CERN's central computing facility beyond its current boundaries set by electrical power and cooling available for computing. The centre is operated as a remote co-location site providing rack-space, electrical power and cooling for server, storage and networking equipment acquired by CERN. The contract includes a 'remote-hands' services for physical handling of hardware (rack mounting, cabling, pushing power buttons, ...) and maintenance repairs (swapping disks, memory modules, ...). However, only CERN personnel have network and console access to the equipment for system administration. This report gives an insight to adaptations of hardware architecture, procurement and delivery procedures undertaken enabling remote physical handling of the hardware. We will also describe tools and procedures developed for automating the registration, burn-in testing, acceptance and maintenance of the equipment as well as an independent but important change to the IT assets management (ITAM) developed in parallel as part of the CERN IT Agile Infrastructure project. Finally, we will report on experience from the first large delivery of 400 servers and 80 SAS JBOD expansion units (24 drive bays) to Wigner in March 2013. Changes were made to the abstract file on 13/06/2014 to correct errors, the pdf file was unchanged.

  2. 46 CFR 32.50-35 - Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels-TB/ALL.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...

  3. A method for enabling real-time structural deformation in remote handling control system by utilizing offline simulation results and 3D model morphing

    International Nuclear Information System (INIS)

    Kiviranta, Sauli; Saarinen, Hannu; Maekinen, Harri; Krassi, Boris

    2011-01-01

    A full scale physical test facility, DTP2 (Divertor Test Platform 2) has been established in Finland for demonstrating and refining the Remote Handling (RH) equipment designs for ITER. The first prototype RH equipment at DTP2 is the Cassette Multifunctional Mover (CMM) equipped with Second Cassette End Effector (SCEE) delivered to DTP2 in October 2008. The purpose is to prove that CMM/SCEE prototype can be used successfully for the 2nd cassette RH operations. At the end of F4E grant 'DTP2 test facility operation and upgrade preparation', the RH operations of the 2nd cassette were successfully demonstrated to the representatives of Fusion For Energy (F4E). Due to its design, the CMM/SCEE robot has relatively large mechanical flexibilities when the robot carries the nine-ton-weighting 2nd Cassette on the 3.6-m long lever. This leads into a poor absolute accuracy and into the situation where the 3D model, which is used in the control system, does not reflect the actual deformed state of the CMM/SCEE robot. To improve the accuracy, the new method has been developed in order to handle the flexibilities within the control system's virtual environment. The effect of the load on the CMM/SCEE has been measured and minimized in the load compensation model, which is implemented in the control system software. The proposed method accounts for the structural deformations of the robot in the control system through the 3D model morphing by utilizing the finite element method (FEM) analysis for morph targets. This resulted in a considerable improvement of the CMM/SCEE absolute accuracy and the adequacy of the 3D model, which is crucially important in the RH applications, where the visual information of the controlled device in the surrounding environment is limited.

  4. Safeguards equipment of the future: Integrated monitoring systems and remote monitoring

    International Nuclear Information System (INIS)

    Sonnier, C.S.; Johnson, C.S.

    1994-01-01

    From the beginning, equipment to support IAEA Safeguards could be characterized as that which is used to measure nuclear material, Destructive Assay (DA) and Non Destructive Assay (NDA), and that which is used to provide continuity of knowledge between inspection intervals, Containment ampersand Surveillance (C/S). C/S equipment has often been thought of as Cameras and Seals, with a limited number of monitors being employed as they became available. In recent years, technology has advanced at an extremely rapid rate, and continues to do so. The traditional film cameras are being replaced by video equipment, and fiber optic and electronic seals have come into rather widespread use. Perhaps the most interesting aspect of this evolution, and that which indicates the wave of the future without much question, is the integration of video surveillance and electronic seals with a variety of monitors. This is demonstrated by safeguards systems which are installed in several nuclear facilities in France, Germany, Japan, the UK, the USA, and elsewhere. The terminology of Integrated Monitoring Systems (IMS) has emerged, with the employment of network technology capable of interconnecting all desired elements in a very flexible manner. Also, the technology for transmission of a wide variety of information to off-site locations, termed Remote Monitoring, is in widespread industrial use, requiring very little adaptation for safeguards use. This paper examines the future of the Integrated Monitoring Systems and Remote Monitoring in International Safeguards, including technical and other related factors

  5. 30 CFR 250.108 - What requirements must I follow for cranes and other material-handling equipment?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What requirements must I follow for cranes and... Performance Standards § 250.108 What requirements must I follow for cranes and other material-handling equipment? (a) All cranes installed on fixed platforms must be operated in accordance with American...

  6. Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations

    International Nuclear Information System (INIS)

    Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation's first and world's largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage

  7. Development of a virtual reality simulator for the ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi; Tesini, Alessandro

    2008-01-01

    The authors developed a simulator for the remote maintenance system of the ITER blanket using a general 3D robotic simulation software, ENVISION. The simulator is connected to the control system of the manipulator, which was developed as part of the blanket maintenance system during the Engineering Design Activity (EDA), and can reconstruct the positions of the manipulator and blanket module using position data transmitted from motors through a LAN. In addition, it can provide virtual visual information (e.g., about the interface structures behind the blanket module) by making the module transparent on the screen. It can also be used for confirming a maintenance sequence before the actual operation. The simulator will be modified further, with addition of other necessary functions, and will finally serve as a prototype of the actual simulator for the blanket remote handling system, which will be procured as part of an in-kind contribution

  8. Specialization and Flexibility in Port Cargo Handling

    Directory of Open Access Journals (Sweden)

    Hakkı KİŞİ

    2016-11-01

    Full Text Available Cargo handling appears to be the fundamental function of ports. In this context, the question of type of equipment and capacity rate need to be tackled with respect to cargo handling principles. The purpose of this study is to discuss the types of equipment to be used in ports, relating the matter to costs and capacity. The question is studied with a basic economic theoretical approach. Various conditions like port location, size, resources, cargo traffic, ships, etc. are given parameters to dictate the type and specification of the cargo handling equipment. Besides, a simple approach in the context of cost capacity relation can be useful in deciding whether to use specialized or flexible equipment. Port equipment is sometimes expected to be flexible to handle various types of cargo as many as possible and sometimes to be specialized to handle one specific type of cargo. The cases that might be suitable for those alternatives are discussed from an economic point of view in this article. Consequently, effectiveness and efficiency criteria play important roles in determining the handling equipment in ports.

  9. Current US strategy and technologies for spent fuel handling

    International Nuclear Information System (INIS)

    Bennett, P.C.; Stringer, J.B.

    1999-01-01

    The United States Department of Energy has recently completed a topical safety analysis report outlining the design and operation of a Centralized Interim Storage Facility for spent commercial nuclear fuel. During the course of the design, dose assessments indicated the need for remote operation of many of the cask handling operations. Use of robotic equipment was identified as a desirable handling solution that is capable of automating many of the operations to maintain throughput, and sufficiently flexible to handle five or more different storage cask designs in varying numbers on a given day. This paper discusses the facility and the dose assessment leading to this choice, and reviews factors to be considered when choosing robotics or automation. Further, a new computer simulation tool to quantify dose to humans working in radiological environments, the Radiological Environment Modeling System (REMS), is introduced. REMS has been developed to produce a more accurate estimate of dose to radiation workers in new activities with radiological hazards. (author)

  10. Comparison of Customer Preference for Bulk Material Handling Equipment through Fuzzy-AHP Approach

    Science.gov (United States)

    Sen, Kingshuk; Ghosh, Surojit; Sarkar, Bijan

    2017-06-01

    In the present study, customer's perception has played one of the important roles for selection of the exact equipment out of available alternatives. The present study is dealt with the method of optimization of selection criteria of a material handling equipment, based on the technical specifications considered to be available at the user end. In this work, the needs of customers have been identified and prioritized, that lead to the selection of number of criteria, which have direct effect upon the performance of the equipment. To check the consistency of selection criteria, first of all an AHP based methodology is adopted with the identified criteria and available product categories, based upon which, the judgments of the users are defined to derive the priority scales. Such judgments expressed the relative strength or intensity of the impact of the elements of the hierarchy. Subsequently, all the alternatives have ranked for each identified criteria with subsequent constitution of weighted matrices. The same has been compared with the normalized values of approximate selling prices of the equipments to determine individual cost-benefit ratio. Based on the cost-benefit ratio, the equipment is ranked. With same conditions, the study is obtained again with a Fuzzy AHP concept, where a fuzzy linguistic approach has reduced the amount of uncertainty in decision making, caused by conventional AHP due to lack of deterministic approach. The priority vectors of category and criteria are determined separately and multiplied to obtain composite score. Subsequently, the average of fuzzy weights was determined and the preferences of equipment are ranked.

  11. Order of 2 May 1977 on a proficiency certificate for handling industrial radioscopy and radiography equipment

    International Nuclear Information System (INIS)

    1977-01-01

    This Order lays down that any person handling industrial radioscopy or radiography equipment must obtain a proficiency certificate delivered by a regional jury made up of the regional director for labour and manpower or his representative, a physician competent for industrial medicine and specialized in radiation protection and an expert in industrial radiology. (NEA) [fr

  12. Remote maintenance techniques in the furnace cell of a high level waste vitrification plant

    International Nuclear Information System (INIS)

    Selig, M.

    1983-01-01

    Remote controlled maintenance and changing techniques for the furnace of a vitrification plant for radioactive waste was developed and tested on a 1:1 model. The model was fitted out with imitation main components, remote control equipment, lead-ins and the complete tubing so that the trials could be carried out in a manner replicating as closely as possible the situation found under operating conditions. The development of remote-handled tube cable connectors, tube cable jumpers and plugs and sockets was an important aspect of the developmental programme. (orig.) [de

  13. Remotely replaceable fuel and feed nozzles for the new waste calcining facility calciner vessel

    International Nuclear Information System (INIS)

    Fletcher, R.D.; Carter, J.A.; May, K.W.

    1978-01-01

    The development and testing of remotely replaceable fuel and feed nozzles for calcination of liquid radioactive wastes in the calciner vessel of the New Waste Calcining Facility being built at the Idaho National Engineering Laboratory is described. A complete fuel nozzle assembly was fabricated and tested at the Remote Maintenance Development Facility to evolve design refinements, identify required support equipment, and develop handling techniques. The design also provided for remote replacement of the nozzle support carriage and adjacent feed and fuel pipe loops using two pairs of master-slave manipulators

  14. Proposal for the award of a contract for the maintenance of industrial transport and handling equipment

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the maintenance of industrial transport and handling equipment. Following a market survey carried out among 145 firms in sixteen Member States, a call for tenders (IT-3049/ST) was sent on 8 May 2002 to two firms and four consortia, one consortium consisting of three firms and three consortia consisting of two firms, in three Member States. By the closing date, CERN had received six tenders from six consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC (FR), SPIE-TRINDEL (FR), ELECTRON (NL) and FENWICK-LINDE (FR), the lowest bidder after alignment, for the maintenance of industrial transport and handling equipment for a total amount of 2 973 280 euros (4 346 900 Swiss francs), covering an initial period of three years starting on 1 October 2002, subject to revision for inflation from 1 October 2005. The contract will include an option for two further one-year extensions beyond t...

  15. Immersive vision assisted remote teleoperation using head mounted displays

    International Nuclear Information System (INIS)

    Vakkapatla, Veerendrababu; Singh, Ashutosh Pratap; Rakesh, V.; Rajagopalan, C.; Murugan, S.; Sai Baba, M.

    2016-01-01

    Handling and inspection of irradiated material is inevitable in nuclear industry. Hot cells are shielded radiation containment chambers equipped with master slave manipulators that facilitates remote handling. The existing methods using viewing windows and cameras for viewing the contents of hot cell to manipulate the radioactive elements have problems such as optical distortion, limited distance teleoperation, limited field of view that lead to inefficient operation. This paper presents a method of achieving immersive teleoperation to operate the master slave manipulator in hot cells by exploiting the advanced tracking and display capabilities of head mounted display devices. (author)

  16. Implementation of a Mobile Accessible Remote Lab

    Directory of Open Access Journals (Sweden)

    Danilo Garbi Zutin

    2008-07-01

    Full Text Available The purpose of the proposed research is to designand implement a LabVIEW-based remote lab client to runon a TCP/IP enabled PDA (Personal Digital Assistantdevice, thus teaching using this wireless m-learning systemwill not be limited by time and location. In addition,resources and equipments can be integrated and shared tothe extent that critically events can be monitored andhandled in time. An environment will be created to trainstudents to handle factory automation, data acquisition,data management, and manufacturing processes usingmobile devices. Furthermore, the integration and sharing oflab equipments via the Internet is a kind of teachingenvironment which promotes learning interests andefficiency using mobile devices.

  17. Concentration of remote-handled, transuranic, sodium nitrate-based sludge using agitated thin-film evaporators

    International Nuclear Information System (INIS)

    Walker, J.F. Jr.; Youngblood, E.L.; Berry, J.B.; Pen, Ben-Li

    1991-01-01

    The Waste Handling and Packaging Plant (WHPP) is being designed at Oak Ridge National Laboratory (ORNL) to prepared transuranic waste for final disposal. Once operational, this facility will process, package, and certify remote-handled transuranic waste for ultimate shipment and disposal at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. One of the wastes that will be handled at WHIPP is the transuranic sludge currently stored at ORNL in eight 50,000-gal underground tanks. The use of an Agitated Thin-Film Evaporator (ATFE) for concentration of this waste is being investigated. Tests have shown that the ATFE can be used to produce a thick slurry, a powder, or a fused salt. A computer model developed at the Savannah River Plant (SRP) to simulate the operation of ATFE's on their waste is being modified for use on the ORNL transuranic sludge. This paper summarizes the results of the test with the ATFEs to date, discusses the changes in the SRP model necessary to use this model with the ORNL waste, and compares the results of the model with the actual data taken from the operation of ATFEs at vendors' test facilities. 8 refs., 1 fig., 3 tabs

  18. Joint Working Group-39, Manufacturing Technology Subworking Group-F, remote handling and automation

    Energy Technology Data Exchange (ETDEWEB)

    Merrill, R.D.

    1995-02-01

    The terms of reference were reviewed and continue to encompass the scope of activities of the SUBWOG. No revisions to the terms of reference were proposed. The list of site contacts who should receive copies of SUBWOG correspondence and meeting minutes was reviewed and updated. Documents exchanged related to the meeting include: Minutes of the sixth SUBOG 39F meeting; transactions of the fifth topical meeting on robotics and remote handling; data on manipulators was forwarded to LLNL from the robotics group at AEA Harwell; and the specifications of the duct remediation robot from the Rocky Flats Plant.

  19. Remote handling of the blanket segments: Testing of 1/3 scale mock-ups on the ROBERTINO facility

    International Nuclear Information System (INIS)

    Maisonnier, D.; Amelotti, F.; Chiasera, A.

    1994-01-01

    The remotized replacement of the blanket segments inside the Vacuum Vessel of a fusion reactor is one of the critical tasks for reactor components design, operational procedures, and safety. This open-quotes hostile environmentclose quotes task must be accomplished by a specific Blanket Handling Device, with a grasping device acting as open-quotes end-effectorclose quotes, because of intervention complexity, of components dimensions and weights, and of consequences of possible accidents during the blanket segments handling operations. Therefore, specific support experimental studies in this field appear to be necessary in order to: select appropriate blanket handling devices and procedures; assess the design of all components involved in the handling operations; perform checks in all field related to the robotized handling control (kinematics and dynamics of the grasping device trajectory planning and motion control, sensing and intelligence of the blanket handling devices, etc.); improve reliability and safety for the replacement sequences; give a realistic estimation of the time duration of the replacement duration. During the test phase, handling operations were carried out on the blanket mock-ups by means of different gripping devices. The operations were driven in the control room by means of the Motion command computer and the real time sensing data display allowed operations' control. The results were analyzed by charting the sensors' data

  20. On current US strategy and technologies for spent fuel handling

    International Nuclear Information System (INIS)

    Bennett, P.C.

    1997-01-01

    The US Department of Energy has recently completed a topical safety analysis report outlining the design and operation of a Centralized Interim Storage Facility for spent commercial nuclear fuel. During the course of the design, dose assessments indicated the need for remote operation of many of the cask handling operations. Use of robotic equipment was identified as a desirable handling solution that is capable of automating many of the operations to maintain throughput, and sufficiently flexible to handle five or more different storage cask designs in varying numbers on a given day. This paper discusses the facility and the dose assessment leading to this choice, and reviews factors to be considered when choosing robotics or automation. Further, a new computer simulation tool to quantify dose to humans working in radiological environments, the Radiological Environment Modeling System (REMS), is introduced. REMS has been developed to produce a more accurate estimate of dose to radiation workers in new activities with radiological hazards

  1. Mockup testing of remote systems for zirconium fuel dissolution process at the Idaho Chemical Processing Plant

    International Nuclear Information System (INIS)

    Paige, D.M.

    1979-01-01

    A facility is being constructed at the Idaho National Engineering Laboratory for storage and dissolution of spent zirconium reactor fuels. The dissolution is carried out in chemical type equipment contained in a large shielded cell. The design provides for remote operations and maintenance as required. Equipment predicted to fail within 5 years is designed for remote maintenance. Each system was fabricated for mockup testing using readily available materials. The mockups were tested, redesigned, and retested until satisfactory remote designs were achieved. Records were made of all the work. All design changes were then incorporated into the ongoing detailed design for the actual equipment. Several of these systems are discussed and they include valve replacement, pump replacement, waste solids handling, mechanism operations and others. The mockup program has saved time and money by eliminating many future problems. In addition, the mockup program will continue through construction, cold startup, and hot operations

  2. Assessment of remote maintenance technologies and their potential application in the Federal Waste Management System [FWMS

    International Nuclear Information System (INIS)

    Kring, C.T.; Meacham, S.A.; Peishel, F.L.

    1988-10-01

    The 40 plus years of remote operating experience in nuclear facilities are summarized, with emphasis on the evolution and capabilities of the remote systems. Current commercially available systems and major development activities are described. The advanced servomanipulator is described, which represents new remote technology that has been developed for the Department of Energy-Nuclear Energy and that can significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. Also based upon past ORNL experience with remote facilities for reprocessing fuel, the guidelines and concepts that are utilized in the design, fabrication, and remote operation of mechanical process equipment and facilities are outlined. The currently available remote handling systems that can be applied, in various combinations, to large-volume in-cell operations are described, and requirements for waste storage facilities are reviewed. A basic trade-off analysis of these remote systems considering waste plant requirements is given. Justification is given for selecting the overhead crane/servomanipulator-based maintenance concept as the option most desirable for future waste processing plant in-cell maintenance. The Robotics/Remote Handling workshop that was implemented by the Office of Storage and Transportation System during the period that this assessment was being performed, helped focus the remaining time allocated to this effort on the future implementation of an overall program plan using a total systems approach. The concluding recommendation of this assessment is that this Robotics/Remote Handling program plan be developed and implemented as soon as possible. 43 refs., 17 figs., 9 tabs

  3. Assessment of remote maintenance technologies and their potential application in the Federal Waste Management System (FWMS)

    Energy Technology Data Exchange (ETDEWEB)

    Kring, C.T.; Meacham, S.A.; Peishel, F.L.

    1988-10-01

    The 40 plus years of remote operating experience in nuclear facilities are summarized, with emphasis on the evolution and capabilities of the remote systems. Current commercially available systems and major development activities are described. The advanced servomanipulator is described, which represents new remote technology that has been developed for the Department of Energy-Nuclear Energy and that can significantly improve remote operations by extending the range of admissible remote tasks and increasing remote work efficiency. Also based upon past ORNL experience with remote facilities for reprocessing fuel, the guidelines and concepts that are utilized in the design, fabrication, and remote operation of mechanical process equipment and facilities are outlined. The currently available remote handling systems that can be applied, in various combinations, to large-volume in-cell operations are described, and requirements for waste storage facilities are reviewed. A basic trade-off analysis of these remote systems considering waste plant requirements is given. Justification is given for selecting the overhead crane/servomanipulator-based maintenance concept as the option most desirable for future waste processing plant in-cell maintenance. The Robotics/Remote Handling workshop that was implemented by the Office of Storage and Transportation System during the period that this assessment was being performed, helped focus the remaining time allocated to this effort on the future implementation of an overall program plan using a total systems approach. The concluding recommendation of this assessment is that this Robotics/Remote Handling program plan be developed and implemented as soon as possible. 43 refs., 17 figs., 9 tabs.

  4. Aspects of remote maintenance in an FRG reprocessing plant from the manufacturer's viewpoint

    International Nuclear Information System (INIS)

    Zeitzchel, G.; Tennie, M.; Saal, G.

    1986-01-01

    In April 1986 a consortium led by Kraftwerk Union AG was commissioned by the German society for nuclear fuel reprocessing (DWK) to build the first West German commercial reprocessing plant for spent fuel assemblies. The main result of the planning efforts regarding remote maintenance operations inside the main process building was the introduction of FEMO technology (FEMO is an acronym based on German for remote handling modular technique). According to this technology the two cells in which the actual reprocessing (which is based on the PUREX technique) takes place are provided with frames to accommodate the process components (tanks, pumps, agitators, etc.), each frame together with the components which it supports forming one module. The two cells are inaccessible and windowless. For handling operations each cell is equipped with an overhead crane and a crane-like manipulator carrier system (MTS) with power manipulator. Viewing of the operations from outside the cells is made possible by television (TV) cameras installed at the crane, the MTS, and the manipulator. This paper addresses some examples of problems that still need to be solved in connection with FEMO handling. In particular, the need for close cooperation between the equipment operator, the component designer, the process engineer, the planning engineer, and the licensing authorities will be demonstrated

  5. Development and use of a remote waste handling system for disposal of greater confinement wastes

    International Nuclear Information System (INIS)

    Williams, R.E.

    1985-01-01

    This paper discusses the design and development of a remotely controlled waste handling system (RWHS) for use in radioactive waste disposal operations. A RWHS was developed at the US Department of Energy's (DOE) Nevada Test Site for use in the Greater Confinement Disposal Test (GCDT). The RWHS consists of a remote control console and the following remotely operated features: a crane, a grapple/manipulator module which is suspended by the crane hoist hook, and closed-circuit television cameras. The RWHS was used to safely place high-specific-activity radioactive waste in greater confinement disposal. Between December 15, 1983, and February 23, 1984, five encapsulated sources were open-air transferred from shielded shipping casks and placed 30 m down a 3-m-dia augered shaft using the RWHS. These sources contained approximately 460 kCi of 90 Sr, 21 kCi of 137 Cs, and 390 Ci of 60 Co. Each source was transferred safely and efficiently and operational personnel did not receive any recordable doses. 3 references, 5 figures

  6. Remote sampling of process fluids in radiochemical plants

    International Nuclear Information System (INIS)

    Sengar, P.B.; Bhattacharya, R.; Ozarde, P. D.; Rana, D.S.

    1990-01-01

    Sampling of process fluids, continuous or periodic, is an essential requirement in any chemical process plant, so as to keep a control on process variables. In a radiochemical plant the task of taking and conveying the samples is a very tricky affair. This is due to the fact that neither the vessels/equipment containing radioactive effluents can be approached for manual sampling nor sampled fluids can be handled directly. The problems become more accute with higher levels of radioactivity. As such, inovative systems have to be devised to obtain and handle the raioactive samples employing remote operations. The remote sampling system developed in this Division has some of the unique features such as taking only requisite amount of samples in microlitre range, practically maintenance free design, avoidence of excess radioactive fluids coming out of process systems, etc. The paper describes in detail the design of remote sampling system and compares the same with existing systems. The design efforts are towards simplicity in operation, obtaining homogenised representative samples and highly economical on man-rem expenditure. The performance of a prototype system has also been evaluated. (author). 3 refs

  7. Study of ITER equatorial port plug handling system and vacuum sealing interface

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Jean-Pierre [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France)], E-mail: jean-pierre.martins@cea.fr; Doceul, Louis; Marol, Sebastien; Delchie, Elise [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France); Cordier, Jean-Jacques; Levesy, Bruno; Tesini, Alessandro [ITER International Organization, F-13108 Saint-Paul-lez-Durance cedex (France); Ciattaglia, Emanuela [EFDA CSU - Garching, Boltzmannstr. 2, D-85748 Garching (Germany); Tivey, Richard [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Gillier, Rene; Abbes, Christophe [GARLOCK - Sealing Technologies - 90, rue de la roche du Geai, F-42029 St-Etienne cedex 1 (France)

    2009-06-15

    In the field of the ITER port plug engineering and integration task, CEA has contributed to define proposals concerning the port plugs vacuum sealing interface with the vessel flange and the equatorial plug handling. The 2001 baseline vacuum flange sealing consisted of TIG welding of a 316L strip plate on to U shapes. This arrangement presented some issues like welding access, implementation of tools, lip consumption, complex local leak test, continuous leak checking. Therefore, an alternate sealing solution based on the use of metallic gaskets is proposed. The different technical aspects are discussed to explain how this design can simplify the maintenance and deal with safety and vacuum requirements. The design of the mechanical attachment and vacuum sealing of the plug has constantly evolved, but the associated remote handling equipment was not systematically reviewed. An update of the cask and maintenance procedure was studied in order to design it in accordance with the last generic plug flange design. This includes a concept of a gripping system that uses the plug flange bolting area and, to help the remote handling process, a cantilever assisting system is suggested to increase the reliability of the transfer operation between vacuum vessel and cask.

  8. Innovative design for FAST divertor compatible with remote handling, electromagnetic and mechanical analyses

    Energy Technology Data Exchange (ETDEWEB)

    Di Gironimo, Giuseppe, E-mail: giuseppe.digironimo@unina.it [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Cacace, Maurizio [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Crescenzi, Fabio [ENEA, Unità Tecnica Fusione, ENEA C. R. Frascati, via E. Fermi 45, 00044 Frascati, Roma (Italy); Labate, Carmelenzo [CREATE, University of Naples Parthenope, Via Acton 38, 80133 Napoli (Italy); Lanzotti, Antonio [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Lucca, Flavio [LT Calcoli srl, Piazza Prinetti 26/B, 23807 Merate, LC (Italy); Marzullo, Domenico; Mozzillo, Rocco [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Pagani, Irene [LT Calcoli srl, Piazza Prinetti 26/B, 23807 Merate, LC (Italy); Ramogida, Giuseppe; Roccella, Selanna [ENEA, Unità Tecnica Fusione, ENEA C. R. Frascati, via E. Fermi 45, 00044 Frascati, Roma (Italy); Viganò, Fabio [LT Calcoli srl, Piazza Prinetti 26/B, 23807 Merate, LC (Italy)

    2015-10-15

    Highlights: • The conceptual design of FAST divertor has been carried out through a continuous process of requirements refinement and design optimization (V-model approach), in order to achieve a design suited to the needs, RH compatible and ITER-like. • Thermal, structural and electromagnetic analyses have been performed, resulting in requirements refinement. • FAST divertor is now characterized by more realistic, reliable and functional features, satisfying thermo-mechanical capabilities and the remote handling (RH) compatibility. - Abstract: Divertor is a crucial component in Tokamaks, aiming to exhaust the heat power and particles fluxes coming from the plasma during discharges. This paper focuses on the optimization process of FAST divertor, aimed at achieving required thermo-mechanical capabilities and the remote handling (RH) compatibility. Divertor RH system final layout has been chosen between different concept solutions proposed and analyzed within the principles of Theory of Inventive Problem Solving (TRIZ). The design was aided by kinematic simulations performed using Digital Mock-Up capabilities of Catia software. Considerable electromagnetic (EM) analysis efforts and top-down CAD approach enabled the design of a final and consistent concept, starting from a very first dimensioning for EM loads. In the final version here presented, the divertor cassette supports a set of tungsten (W) actively cooled tiles which compose the inner and outer vertical targets, facing the plasma and exhausting the main part of heat flux. W-tiles are assembled together considering a minimum gap tolerance (0.1–0.5 mm) to be mandatorily respected. Cooling channels have been re-dimensioned to optimize the geometry and the layout of coolant volume inside the cassette has been modified as well to enhance the general efficiency.

  9. Application of wireless LAN technology to remote monitoring for inspection equipment

    International Nuclear Information System (INIS)

    Ishiyama, Koichi; Kimura, Takashi; Miura, Yasushi; Yamaguchi, Katsuhiro; Kabuki, Toshihide

    2011-01-01

    To support inspections under an Integrated Safeguards regime into Tokai Reprocessing Plant (TRP), the IAEA suggested making use of Remote Monitoring (RM) capabilities to the inspection equipment (surveillance camera and NDA systems) installed in the spent fuel storage area at TRP. Since TRP had no pre-prepared cabling infrastructure for data transmission in the spent fuel storage area, the option of wireless LAN was chosen over the telephone line due to its lower installation costs. Feasibility studies and tests were performed by TRP on communication and particularly on long-term continuous communication using wireless LAN equipment composed of APs (AP: Access Point) and the external antennas for introducing wireless LAN technology to RM. As a result it was recognized that wireless LAN has enough ability to communicate for long periods of time and consequently the IAEA installed the AP and the external antenna to each inspection equipment and the wireless LAN technology was applied for RM. In this paper, the summary of each test and the results are reported. (author)

  10. Hot laboratory in Saclay. Equipment and radio-metallurgy technique of the hot lab in Saclay. Description of hot cell for handling of plutonium salts. Installation of an hot cell; Laboratoire a tres haute activite de Saclay. Equipement et techniques radiometallurgiques du laboratoire a haute activite de Saclay. Description de cellules pour manipulation de sels de plutonium. Amenagement d'une cellule du laboratoire de haute activite

    Energy Technology Data Exchange (ETDEWEB)

    Bazire, R; Blin, J; Cherel, G; Duvaux, Y; Cherel, G; Mustelier, J P; Bussy, P; Gondal, G; Bloch, J; Faugeras, P; Raggenbass, A; Raggenbass, P; Fufresne, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1959-07-01

    Describes the conception and installation of the hot laboratory in Saclay (CEA, France). The construction ended in 1958. The main aim of this laboratory is to examine fuel rods of EL2 and EL3 as well as nuclear fuel studies. It is placed in between both reactors. In a first part, the functioning and specifications of the hot lab are given. The different hot cells are described with details of the ventilation and filtration system as well as the waste material and effluents disposal. The different safety measures are explained: description of the radiation protection, decontamination room and personnel monitoring. The remote handling equipment is composed of cutting and welding machine controlled with manipulators. Periscopes are used for sight control of the operation. In a second part, it describes the equipment of the hot lab. The unit for an accurate measurement of the density of irradiated uranium is equipped with an high precision balance and a thermostat. The equipment used for the working of irradiated uranium is described and the time length of each operation is given. There is also an installation for metallographic studies which is equipped with a manipulation bench for polishing and cleaning surfaces and a metallographic microscope. X-ray examination of uranium pellets will also be made and results will be compared with those of metallography. The last part describes the hot cells used for the manipulation of plutonium salts. The plutonium comes from the reprocessing plant and arrived as a nitric solution. Thus these cells are used to study the preparation of plutonium fluorides from nitric solution. The successive operations needed are explained: filtration, decontamination and extraction with TBP, purification on ion exchangers and finally formation of the plutonium fluorides. Particular attention has been given to the description of the specifications of the different gloveboxes and remote handling equipment used in the different reaction steps and

  11. Hot laboratory in Saclay. Equipment and radio-metallurgy technique of the hot lab in Saclay. Description of hot cell for handling of plutonium salts. Installation of an hot cell; Laboratoire a tres haute activite de Saclay. Equipement et techniques radiometallurgiques du laboratoire a haute activite de Saclay. Description de cellules pour manipulation de sels de plutonium. Amenagement d'une cellule du laboratoire de haute activite

    Energy Technology Data Exchange (ETDEWEB)

    Bazire, R.; Blin, J.; Cherel, G.; Duvaux, Y.; Cherel, G.; Mustelier, J.P.; Bussy, P.; Gondal, G.; Bloch, J.; Faugeras, P.; Raggenbass, A.; Raggenbass, P.; Fufresne, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1959-07-01

    Describes the conception and installation of the hot laboratory in Saclay (CEA, France). The construction ended in 1958. The main aim of this laboratory is to examine fuel rods of EL2 and EL3 as well as nuclear fuel studies. It is placed in between both reactors. In a first part, the functioning and specifications of the hot lab are given. The different hot cells are described with details of the ventilation and filtration system as well as the waste material and effluents disposal. The different safety measures are explained: description of the radiation protection, decontamination room and personnel monitoring. The remote handling equipment is composed of cutting and welding machine controlled with manipulators. Periscopes are used for sight control of the operation. In a second part, it describes the equipment of the hot lab. The unit for an accurate measurement of the density of irradiated uranium is equipped with an high precision balance and a thermostat. The equipment used for the working of irradiated uranium is described and the time length of each operation is given. There is also an installation for metallographic studies which is equipped with a manipulation bench for polishing and cleaning surfaces and a metallographic microscope. X-ray examination of uranium pellets will also be made and results will be compared with those of metallography. The last part describes the hot cells used for the manipulation of plutonium salts. The plutonium comes from the reprocessing plant and arrived as a nitric solution. Thus these cells are used to study the preparation of plutonium fluorides from nitric solution. The successive operations needed are explained: filtration, decontamination and extraction with TBP, purification on ion exchangers and finally formation of the plutonium fluorides. Particular attention has been given to the description of the specifications of the different gloveboxes and remote handling equipment used in the different reaction steps and

  12. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  13. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  14. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    CERN Document Server

    Rossel, R E; Richter, D; Wendt, K D A; Rothe, S; Marsh, B A

    2013-01-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The syst...

  15. Development of radiation hard components for ITER blanket remote handling system

    Energy Technology Data Exchange (ETDEWEB)

    Saito, Makiko, E-mail: saito.makiko@jaea.go.jp; Anzai, Katsunori; Maruyama, Takahito; Noguchi, Yuto; Ueno, Kenichi; Takeda, Nobukazu; Kakudate, Satoshi

    2016-11-01

    Highlights: • Clarify the components that will degrade by gamma ray irradiation. • Perform the irradiation tests to BRHS components. • Optimize the materials to increase the radiation hardness. - Abstract: The ITER blanket remote handling system (BRHS) will be operated in a high radiation environment (250 Gy/h max.) and must stably handle the blanket modules, which weigh 4.5 t and are more than 1.5 m in length, with a high degree of position and posture accuracy. The reliability of the system can be improved by reviewing the failure events of the system caused by high radiation. A failure mode and effects analysis (FMEA) identified failure modes and determined that lubricants, O-rings, and electric insulation cables were the dominant components affecting radiation hardness. Accordingly, we tried to optimize the lubricants and cables of the AC servo motors by using polyphenyl ether (PPE)-based grease and polyether ether ketone (PEEK), respectively. Materials containing radiation protective agents were also selected for the cable sheaths and O-rings to improve radiation hardness. Gamma ray irradiation tests were performed on these components and as a result, a radiation hardness of 8 MGy was achieved for the AC servo motors. On the other hand, to develop the radiation hardness and BRHS compatibility furthermore, the improvement of materials of cable and O ring were performed.

  16. Remote sampling and analysis of highly radioactive samples in shielded boxes

    International Nuclear Information System (INIS)

    Kirpikov, D.A.; Miroshnichenko, I.V.; Pykhteev, O.Yu.

    2010-01-01

    The sampling procedure used for highly radioactive coolant water is associated with high risk of personnel irradiation and uncontrolled radioactive contamination. Remote sample manipulation with provision for proper radiation shielding is intended for safety enhancement of the sampling procedure. The sampling lines are located in an isolated compartment, a shielded box. Various equipment which enables remote or automatic sample manipulation is used for this purpose. The main issues of development of the shielded box equipment intended for a wider ranger of remote chemical analyses and manipulation techniques for highly radioactive water samples are considered in the paper. There were three principal directions of work: Transfer of chemical analysis performed in the laboratory inside the shielded box; Prevalence of computer-aided and remote techniques of highly radioactive sample manipulation inside the shielded box; and, Increase in control over sampling and determination of thermal-hydraulic parameters of the coolant water in the sampling lines. The developed equipment and solutions enable remote chemical analysis in the restricted volume of the shielded box by using ion-chromatographic, amperometrical, fluorimetric, flow injection, phototurbidimetric, conductometric and potentiometric methods. Extent of control performed in the shielded box is determined taking into account the requirements of the regulatory documents as well as feasibility and cost of the technical adaptation of various methods to the shielded box conditions. The work resulted in highly precise determination of more than 15 indexes of the coolant water quality performed in on-line mode in the shielded box. It averages to 80% of the total extent of control performed at the prototype reactor plants. The novel solutions for highly radioactive sample handling are implemented in the shielded box (for example, packaging, sample transportation to the laboratory, volume measurement). The shielded box is

  17. Evaluation of the Total Cost of Ownership of Fuel Cell-Powered Material Handling Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Ramsden, T.

    2013-04-01

    This report discusses an analysis of the total cost of ownership of fuel cell-powered and traditional battery-powered material handling equipment (MHE, or more typically 'forklifts'). A number of fuel cell MHE deployments have received funding support from the federal government. Using data from these government co-funded deployments, DOE's National Renewable Energy Laboratory (NREL) has been evaluating the performance of fuel cells in material handling applications. NREL has assessed the total cost of ownership of fuel cell MHE and compared it to the cost of ownership of traditional battery-powered MHE. As part of its cost of ownership assessment, NREL looked at a range of costs associated with MHE operation, including the capital costs of battery and fuel cell systems, the cost of supporting infrastructure, maintenance costs, warehouse space costs, and labor costs. Considering all these costs, NREL found that fuel cell MHE can have a lower overall cost of ownership than comparable battery-powered MHE.

  18. Defense Remote Handled Transuranic Waste Cost/Schedule Optimization Study

    International Nuclear Information System (INIS)

    Pierce, G.D.; Wolaver, R.W.; Carson, P.H.

    1986-11-01

    The purpose of this study is to provide the DOE information with which it can establish the most efficient program for the long management and disposal, in the Waste Isolation Pilot Plant (WIPP), of remote handled (RH) transuranic (TRU) waste. To fulfill this purpose, a comprehensive review of waste characteristics, existing and projected waste inventories, processing and transportation options, and WIPP requirements was made. Cost differences between waste management alternatives were analyzed and compared to an established baseline. The result of this study is an information package that DOE can use as the basis for policy decisions. As part of this study, a comprehensive list of alternatives for each element of the baseline was developed and reviewed with the sites. The principle conclusions of the study follow. A single processing facility for RH TRU waste is both necessary and sufficient. The RH TRU processing facility should be located at Oak Ridge National Laboratory (ORNL). Shielding of RH TRU to contact handled levels is not an economic alternative in general, but is an acceptable alternative for specific waste streams. Compaction is only cost effective at the ORNL processing facility, with a possible exception at Hanford for small compaction of paint cans of newly generated glovebox waste. It is more cost effective to ship certified waste to WIPP in 55-gal drums than in canisters, assuming a suitable drum cask becomes available. Some waste forms cannot be packaged in drums, a canister/shielded cask capability is also required. To achieve the desired disposal rate, the ORNL processing facility must be operational by 1996. Implementing the conclusions of this study can save approximately $110 million, compared to the baseline, in facility, transportation, and interim storage costs through the year 2013. 10 figs., 28 tabs

  19. The ITER Remote Maintenance Management System

    International Nuclear Information System (INIS)

    Tesini, Alessandro; Rolfe, A.C.

    2009-01-01

    A major challenge for the ITER project is to develop and implement a Remote Maintenance System, which can deliver high Tokamak availability within the constraints of the overall ITER programme objectives. Much of the maintenance of ITER will be performed using remote handling methods and some with combined manual and remote activities working together. The organization and management of the ITER remote handling facilities will be of a scale unlike any other remote handling application in the world. The ITER remote handling design and procurement activities will require co-ordination and management across many different sites throughout the world. It will be a major challenge for the ITER project to ensure a consistent quality and technical approach in all of the contributing parties. To address this issue the IO remote handling team are implementing the ITER Maintenance Management Plan (IMMP) comprising an overarching document defining the policies and methodologies (ITER Remote Maintenance Management System or IMMS) and an associated ITER remote handling code of practise (IRHCOP). The IMMS will be in document form available as a pdf file or similar. The IRHCOP will be implemented as a web based application and will provide access to the central resource of the entire code of practise from any location in the world. The IRHCOP data library will be centrally controlled in order that users can be assured of the data relevance and authenticity. This paper will describe the overall approach being taken to deal with this challenge and go on to detail the structure and content of both the IMMS and the IRHCOP.

  20. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    Science.gov (United States)

    Rossel, R. E.; Fedosseev, V. N.; Marsh, B. A.; Richter, D.; Rothe, S.; Wendt, K. D. A.

    2013-12-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  1. Process and equipment development for hot isostatic pressing treatability study

    Energy Technology Data Exchange (ETDEWEB)

    Bateman, Ken; Wahlquist, Dennis; Malewitz, Tim

    2015-03-01

    Battelle Energy Alliance (BEA), LLC, has developed processes and equipment for a pilot-scale hot isostatic pressing (HIP) treatability study to stabilize and volume reduce radioactive calcine stored at Idaho National Laboratory (INL). In 2009, the U. S. Department of Energy signed a Record of Decision with the state of Idaho selecting HIP technology as the method to treat 5,800 yd^3 (4,400 m^3) of granular zirconia and alumina calcine produced between 1953 and 1992 as a waste byproduct of spent nuclear fuel reprocessing. Since the 1990s, a variety of radioactive and hazardous waste forms have been remotely treated using HIP within INL hot cells. To execute the remote process at INL, waste is loaded into a stainless-steel or aluminum can, which is evacuated, sealed, and placed into a HIP furnace. The HIP simultaneously heats and pressurizes the waste, reducing its volume and increasing its durability. Two 1 gal cans of calcine waste currently stored in a shielded cask were identified as candidate materials for a treatability study involving the HIP process. Equipment and materials for cask-handling and calcine transfer into INL hot cells, as well as remotely operated equipment for waste can opening, particle sizing, material blending, and HIP can loading have been designed and successfully tested. These results demonstrate BEA’s readiness for treatment of INL calcine.

  2. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  3. Remote maintenance considerations for swimming pool tokamak reactor

    International Nuclear Information System (INIS)

    Niikura, S.; Yamada, M.; Kasai, M.

    1983-01-01

    Swimming Pool Tokamak Reactor (SPTR) is one of the candidate devices which are expected to demonstrate physical and engineering feasibility for fusion power reactors. In SPTR, water shield is adopted instead of solid shield structures. Among the advantages of SPTR are, from viewpoint of remote maintenance, small handling weight and high space availability between TF coils and a vacuum vessel. On the other hand, high dose rate during reactor repair and adverse effects on remote maintenance equipment by the shielding water might be the disadvantage of SPTR, where it is assumed that the shielding water is drained during reactor repair. Since the design of SPTR is still at the preliminary stage, for remote maintenance, much effort has been directed to clarification of design conditions such as environment and handling weight. As for the remote maintenance system concepts, studies have been focussed on those for a vacuum vessel and its internal structure (blanket, divertor and protection walls) expected to be repaired more frequently. The vacuum vessel assembly is divided into 21 sectors and number of TF coils is 14. A pair of TF coils are connected with each other by antitorque beams on the whole side surface. Vacuum vessel cassettes and associated blanket, divertor and protection walls are replaced through seven windows between TF coils pairs. Therefore each vacuum vessel cassette is required moving mechanisms in toroidal and radial directions. Options for slide mechanisms are wheels, balls, rollers and water bearings. Options for driving the cassette are self-driving by hydraulic motors and external driving by rack-pinion, wires or specific vehicles. As a result of studies, the moving mechanism with wheels and hydraulic motors has been selected for the reference design, and the system with water bearings and rack-pinion as an alternative. Furthermore typical concepts have been obtained for remote maintenance equipment such as wall-mounted manipulators, tools for

  4. Remote tooling applications at the FFTF/IEM cell

    International Nuclear Information System (INIS)

    Webb, R.H.

    1990-01-01

    At the fast flux test facility, a US Government-owned 400-MW(thermal) sodium-cooled fast reactor, the interim examination and maintenance (IEM) cell is used for the remote disassembly of irradiated fuel and material experiments and remote maintenance operations. The IEM cell has been a challenging area both for maintenance and operation of remote equipment. Innovative tooling has been required to provide the reliability, strength and dexterity for performing myriad bolting, cutting, gripping, and other such functions. Over the years, a set of basic components that can be modified and adapted to several applications has been developed. These include torque multipliers, torque limiters, right-angle drives, and many common hand tools with fittings designed to be handled by master-slave manipulators (MSM) or electromechanical manipulator (EMM) hands. An example of such a system is the closed loop ex-vessel machine (CLEM) grapple change tool, which is designed for both hands-on use in a glove box and remote use in the IEM cell

  5. User Interface Technology to Reduce Mental Transformations for Tangible Remote Dismantling Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Hyun, Dongjun; Kim, Ikjune; Lee, Jonghwan; Kim, Geun-Ho; Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jeikwon; Choi, Jong-Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    High-level radiation of the major components restricts access by human workers, and makes an accident or outage during the dismantling process more difficult to deal with. Since unexpected situations causes waste of budget and an aggravation of safety, the preliminary verification of the dismantling processes and equipment by the tangible remote dismantling simulator is very important. The design optimization of the dismantling processes and equipment is one of the most important objectives of the tangible remote dismantling simulator, as well. This paper proposes a user interface technology to reduce mental transformations for the tangible remote dismantling simulator. At the dismantling process simulation using the tangible remote dismantling simulator, the most difficult work is the remote operation handling the high degrees-of-freedom (DOF) manipulator due to complex mental transformations. The proposed user interface technology reduces mental transformations with constraints using the point projection and direction projection. The test result of the cutting process over the closure head of the RPV demonstrates that the proposed mental transformation reduction technology is operated successfully in the tangible remote dismantling simulator, and lets the operator be easy to control the high DOF manipulator even in the most difficult operation by reducing DOFs to be controlled manually.

  6. User Interface Technology to Reduce Mental Transformations for Tangible Remote Dismantling Simulator

    International Nuclear Information System (INIS)

    Hyun, Dongjun; Kim, Ikjune; Lee, Jonghwan; Kim, Geun-Ho; Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jeikwon; Choi, Jong-Won

    2015-01-01

    High-level radiation of the major components restricts access by human workers, and makes an accident or outage during the dismantling process more difficult to deal with. Since unexpected situations causes waste of budget and an aggravation of safety, the preliminary verification of the dismantling processes and equipment by the tangible remote dismantling simulator is very important. The design optimization of the dismantling processes and equipment is one of the most important objectives of the tangible remote dismantling simulator, as well. This paper proposes a user interface technology to reduce mental transformations for the tangible remote dismantling simulator. At the dismantling process simulation using the tangible remote dismantling simulator, the most difficult work is the remote operation handling the high degrees-of-freedom (DOF) manipulator due to complex mental transformations. The proposed user interface technology reduces mental transformations with constraints using the point projection and direction projection. The test result of the cutting process over the closure head of the RPV demonstrates that the proposed mental transformation reduction technology is operated successfully in the tangible remote dismantling simulator, and lets the operator be easy to control the high DOF manipulator even in the most difficult operation by reducing DOFs to be controlled manually

  7. 9 CFR 381.201 - Means of conveyance and equipment used in handling poultry products offered for entry to be...

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Imported Poultry Products § 381.201... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Means of conveyance and equipment used in handling poultry products offered for entry to be maintained in sanitary condition. 381.201...

  8. Practical remote monitoring using COTS equipment

    International Nuclear Information System (INIS)

    Kadner, S.; White, R.M.; Pepper, S.

    1999-01-01

    It has been clear for some time that the gap between the international nonproliferation verification agenda and the available financial means can only be bridged by adoption of remote monitoring technologies in specific safeguards applications. Past technology development efforts have focused largely on sensor networking and dedicated communications services to link the inspector to the Safeguards instruments using the traditional verification paradigm. Today we have several Commercial Off The Shelf (COTS) sensor networking alternatives that are viable for Safeguards and it has been found that no single communication service can be uniformly deployed in all verification scenarios. While sensor networking is an important element of remote monitoring technology, it does not by itself provide a viable remote monitoring capability. This paper discusses several lessons have been learned from the IAEA's remote monitoring installation in Pelindaba, South Africa and how those lessons have been extended to near-term installations in Japan and Canada. Key among those lessons is that the traditional verification paradigm cannot, and should not, be carried forward into the remote monitoring regime and that the primary technology component of the successful remote monitoring installation is the Server, which processes, filters, categorizes, and otherwise acts on the sensor inputs to dramatically reduce the volume and increase the information -density of data that is transferred remotely using indigenous communication infrastructures. (author)

  9. Conceptual design of the handling and storage system of the spent target vessel for neutron scattering facility 2

    International Nuclear Information System (INIS)

    Adachi, Junichi; Kaminaga, Masanori; Sasaki, Shinobu; Haga, Katsuhiro; Aso, Tomokazu; Kinoshita, Hidetaka; Hino, Ryutaro

    2002-01-01

    In designing the neutron scattering facility, a spent target vessel should be replaced with remote handling devices in order to protect radioactive exposure, since it would be highly activated through the high energy neutron irradiation caused by the spallation reaction between mercury of the target material and the MW-class proton beam. In the storage of the spent target vessel, it is necessary to consider decay heat of the target vessel and mercury contamination caused by vaporization of the residual mercury in the vessel. A conceptual design has been carried out to establish basic concept and to clarify its specification of main equipments on handling and storage systems for the spent target vessel. This report presents the basic concept and a system plot plan based on latest design works of remote handling devices such as a spent target vessel storage cask and a target vessel exchange trolley, which aim at reasonability and simplification. In addition, storage systems for the spent moderator vessel, the spent proton beam window and the spent reflector vessel are also investigated based on the plot plan. (author)

  10. Presentation of accessibility equipment for primary pipings, IHX, pumps and appertaining manipulator tests

    International Nuclear Information System (INIS)

    Hahn, G.; Hoeft, E.

    1980-01-01

    Accessibility and inservice procedure of SNR-300 components are described. Due to the high radiation level in the primary system it was necessary to develop special equipment to permit access to the testing components. The pertinent examination methods for surveying welding seams are acoustic (ultrasonic) and optical procedures (TV cameras, surface crack tests). This can be done by remote-controlled manipulators and special devices, which can transport the inspection system by rails to the testing position. Presently, relatively limited experience exists for such remote-controlled handling in nuclear power plants. Thus model experiments were carried out on a model pipe section at INTERATOM. The performed test shows that the concept planned to perform inservice by using remote-controlled manipulators can be realized successfully. (author)

  11. Startup of the remote laboratory-scale waste-treatment facility

    International Nuclear Information System (INIS)

    Knox, C.A.; Siemens, D.H.; Berger, D.N.

    1981-01-01

    The Remote Laboratory-Scale Waste-Treatment Facility was designed as a system to solidify small volumes of radioactive liquid wastes. The objectives in operating this facility are to evaluate solidification processes, determine the effluents generated, test methods for decontaminating the effluents, and provide radioactive solidified waste products for evaluation. The facility consists of a feed-preparation module, a waste-solidification module and an effluent-treatment module. The system was designed for remote installation and operation. Several special features for remotely handling radioactive materials were incorporated into the design. The equipment was initially assembled outside of a radiochemical cell to size and fabricate the connecting jumpers between the modules and to complete some preliminary design-verification tests. The equipment was then disassembled and installed in the radiochemical cell. When installation was completed the entire system was checked out with water and then with a nonradioactive simulated waste solution. The purpose of these operations was to start up the facility, find and solve operational problems, verify operating procedures and train personnel. The major problems experienced during these nonradioactive runs were plugging of the spray calciner nozzle and feed tank pumping failures. When these problems were solved, radioactive operations were started. This report describes the installation of this facility, its special remote design feature and the startup operations

  12. MIC damage in a water coolant header for remote process equipment

    International Nuclear Information System (INIS)

    Jenkins, C.F.

    1996-01-01

    Stainless steel water piping, used to supply coolant for remote chemical separations equipment, developed several leaks during low flow conditions, the result of an extended interruption of operations. All the leaks occurred at welds in the bottom of the pipe, which was blanketed with silt deposits from unfiltered well water used for cooling. Ultrasonic, radiographic, and metallographic examinations of the leak sites revealed worm-hole pitting adjacent to the welds. Seepage at the penetrations was strongly acidic and corroded the external pipe surfaces. Analyses of the water and deposits suggested microbiologically influenced corrosion and fouling

  13. The ITER EC H and CD upper launcher: Analysis of remote handling compatibility

    International Nuclear Information System (INIS)

    Ronden, D.M.S.; Baar, M. de; Chavan, R.; Elzendoorn, B.S.Q.; Goodman, T.; Heemskerk, C.J.M.; Henderson, M.A.; Koning, J.F.; Saibene, G.; Spaeh, P.; Strauss, D.

    2011-01-01

    Research highlights: → RH class 1 requires a full RH compatible design and a detailed maintenance plan that needs to be demonstrated through hardware mockup testing. → RH class 2 requires a full RH compatible design and a detailed and verified maintenance plan. → RH class 3 requires a RH compatible design and a basic maintenance plan. - Abstract: The present design of the ECH (Electron Cyclotron Heating) upper port launcher has been evaluated in light of the ITER remote handling (RH) requirements. Changes to the launcher design associated with the accessibility, maintainability and manageability of replaceable components are presented. Captive bolts were placed along the flange of the Blanket Shielding Module (BSM). A hinge mechanism was integrated to simplify the (dis-)mounting of the BSM and a frame with incorporated cooling and actuation lines was suggested for simplified mounting and replacement of the steerable mirrors. Rotating the upper port plug upside-down improves maintenance access and component handling. Tools are proposed for manipulation of the port plug and its sub-components. The RH compatibility analysis can improve a design. Early consideration of RH requirements and implementation of necessary features is therefore vital.

  14. Preliminary concept design of the divertor remote handling system for DEMO power plant

    Energy Technology Data Exchange (ETDEWEB)

    Carfora, D., E-mail: dario.carfora@gmail.com [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland); Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); ENEA/CREATE/University of Naples Federico II, 80125 Naples (Italy); Di Gironimo, G. [ENEA/CREATE/University of Naples Federico II, 80125 Naples (Italy); Järvenpää, J. [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland); Huhtala, K. [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Määttä, T.; Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1300, FI-33101 Tampere (Finland)

    2014-11-15

    Highlights: • Concept design of the RH system for the DEMO fusion power plant. • Divertor Mover: Hydraulic telescopic boom concept design. An alternative solution to ITER rack and pinion divertor mover (CMM). • Divertor cassettes end effector studies. • Transportation cask conceptual studies and logistic. - Abstract: This paper is based on the remote maintenance system project (WPRM) for the demonstration fusion power reactor (DEMO). Following ITER, DEMO aims to confirm the capability of generating several hundred of MW of net electricity by 2050. The main objective of these activities is to develop an efficient and reliable remote handling (RH) system for replacing the divertor cassettes. This paper presents the preliminary results of the concept design of the divertor RH system. The proposed divertor mover is a hydraulic telescopic boom driven from the transportation cask through the maintenance tunnel of the reactor. The boom is divided in three sections of 4 m each, and it is driving an end-effector in order to perform the scheduled operations of maintenance inside the vacuum vessel. Two alternative design of the end effector to grip and manipulate the divertor cassette are also presented in this work. Both the concepts are hydraulically actuated, basing on the ITER previous studies. The divertor cassette end-effector consists of a lifting arm linked to the divertor mover, a tilting plate, a cantilever arm and a hook-plate. The main objective of this paper is to illustrate the feasibility of DEMO divertor remote maintenance operations.

  15. Analysis of remote operating systems for space-based servicing operations. Volume 2: Study results

    Science.gov (United States)

    1985-01-01

    The developments in automation and robotics have increased the importance of applications for space based servicing using remotely operated systems. A study on three basic remote operating systems (teleoperation, telepresence and robotics) was performed in two phases. In phase one, requirements development, which consisted of one three-month task, a group of ten missions were selected. These included the servicing of user equipment on the station and the servicing of the station itself. In phase two, concepts development, which consisted of three tasks, overall system concepts were developed for the selected missions. These concepts, which include worksite servicing equipment, a carrier system, and payload handling equipment, were evaluated relative to the configurations of the overall worksite. It is found that the robotic/teleoperator concepts are appropriate for relatively simple structured tasks, while the telepresence/teleoperator concepts are applicable for missions that are complex, unstructured tasks.

  16. Remote viewing optical instruments for nuclear installations [Paper No.: J8

    International Nuclear Information System (INIS)

    Das, N.C.; Koppikar, R.S.; Modi, R.K.; Radke, M.G.

    1993-01-01

    Inspection of highly radioactive components and materials in the hot cell and the reactor core requires several remote viewing and remote handling equipment, considering the safety of the operator. With this objective two wall periscopes for the hot cells of the Waste Immobilisation Project (WIP) at Tarapur , a remote viewing macrograph for the hot cell facility at Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam and a core viewing periscope for the fast breeder test reactor (FBTR), Kalpakkam has also been developed. Construction principle and the experimental performance of these instruments are discussed. The overall visual magnifications of the WIP and the FBTR periscopes are 2x and the same for the IGCAR macrograph is 20x. (author). 3 figs

  17. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  18. Use of remote video auditing to validate Ebola level II personal protective equipment competency.

    Science.gov (United States)

    Allar, Peter J; Frank-Cooper, Madalyn

    2015-06-01

    Faced with an Ebola-related mandate to regularly train frontline hospital staff with the donning and doffing of personal protective equipment, a community hospital's emergency department implemented remote video auditing (RVA) to assist in the training and remediation of its nursing staff. RVA was found to be useful in assessing performance and facilitating remediation. Copyright 2015, SLACK Incorporated.

  19. Technology Development And Deployment Of Systems For The Retrieval And Processing Of Remote-Handled Sludge From Hanford K-West Fuel Storage Basin

    International Nuclear Information System (INIS)

    Raymond, R.E.

    2011-01-01

    In 2011, significant progress was made in developing and deploying technologies to remove, transport, and interim store remote-handled sludge from the 105-K West Fuel Storage Basin on the Hanford Site in south-central Washington State. The sludge in the 105-K West Basin is an accumulation of degraded spent nuclear fuel and other debris that collected during long-term underwater storage of the spent fuel. In 2010, an innovative, remotely operated retrieval system was used to successfully retrieve over 99.7% of the radioactive sludge from 10 submerged temporary storage containers in the K West Basin. In 2011, a full-scale prototype facility was completed for use in technology development, design qualification testing, and operator training on systems used to retrieve, transport, and store highly radioactive K Basin sludge. In this facility, three separate systems for characterizing, retrieving, pretreating, and processing remote-handled sludge were developed. Two of these systems were successfully deployed in 2011. One of these systems was used to pretreat knockout pot sludge as part of the 105-K West Basin cleanup. Knockout pot sludge contains pieces of degraded uranium fuel ranging in size from 600 μm to 6350 μm mixed with pieces of inert material, such as aluminum wire and graphite, in the same size range. The 2011 pretreatment campaign successfully removed most of the inert material from the sludge stream and significantly reduced the remaining volume of knockout pot product material. Removing the inert material significantly minimized the waste stream and reduced costs by reducing the number of transportation and storage containers. Removing the inert material also improved worker safety by reducing the number of remote-handled shipments. Also in 2011, technology development and final design were completed on the system to remove knockout pot material from the basin and transport the material to an onsite facility for interim storage. This system is scheduled

  20. A multi-component patient-handling intervention improves attitudes and behaviors for safe patient handling and reduces aggression experienced by nursing staff

    DEFF Research Database (Denmark)

    Risør, Bettina Wulff; Casper, Sven Dalgas; Andersen, Lars L.

    2017-01-01

    This study evaluated an intervention for patient-handling equipment aimed to improve nursing staffs' use of patient handling equipment and improve their general health, reduce musculoskeletal problems, aggressive episodes, days of absence and work-related accidents. As a controlled before......-after study, questionnaire data were collected at baseline and 12-month follow-up among nursing staff at intervention and control wards at two hospitals. At 12-month follow-up, the intervention group had more positive attitudes towards patient-handling equipment and increased use of specific patient......-handling equipment. In addition, a lower proportion of nursing staff in the intervention group had experienced physically aggressive episodes. No significant change was observed in general health status, musculoskeletal problems, days of absence or work-related accidents. The intervention resulted in more positive...

  1. A new virtual-reality training module for laparoscopic surgical skills and equipment handling: can multitasking be trained? A randomized controlled trial

    NARCIS (Netherlands)

    Bongers, P.J.; van Hove, P.D.; Stassen, L.P.S.; Schreuder, HWR; Dankelman, J.

    Objective During laparoscopic surgery distractions often occur and multitasking between surgery and other tasks, such as technical equipment handling, is a necessary competence. In psychological research, reduction of adverse effects of distraction is demonstrated when specifically multitasking is

  2. Remote technology applications in spent fuel management

    International Nuclear Information System (INIS)

    2005-03-01

    Spent fuel management has become a prospective area for application of remote technology in recent years with a steadily growing inventory of spent fuel arising from nuclear power production. A remark that could be made from the review of technical information collected from the IAEA meetings was that remote technology in spent fuel management has matured well through the past decades of industrial experiences. Various remote technologies have been developed and applied in the past for facility operation and maintenance work in spent fuel examination, storage, transportation, reprocessing and radioactive waste treatment, among others, with significant accomplishments in dose reduction to workers, enhancement of reliability, etc. While some developmental activities are continuing for more advanced applications, industrial practices have made use of simple and robust designs for most of the remote systems technology applications to spent fuel management. In the current state of affairs, equipment and services in remote technology are available in the market for applications to most of the projects in spent fuel management. It can be concluded that the issue of critical importance in remote systems engineering is to make an optimal selection of technology and equipment that would best satisfy the as low as reasonably achievable (ALARA) requirements in terms of relevant criteria like dose reduction, reliability, costs, etc. In fact, good selection methodology is the key to efficient implementation of remote systems applications in the modern globalized market. This TECDOC gives a review of the current status of remote technology applications for spent fuel management, based on country reports from some Member States presented at the consultancy meetings, of which updated reports are attached in the annex. The scope of the review covers the series of spent fuel handling operations involved in spent fuel management, from discharge from reactor to reprocessing or

  3. Remote handling techniques in decommissioning - A report of the NEA Co-operative Programme on Decommissioning (CPD) project

    International Nuclear Information System (INIS)

    Borchardt, Ralf; Denissen, Luc; Desbats, Philippe; Jeanjacques, Michel; Nokhamzon, Jean-Guy; Valentin, Pierre; Slater, Steve; Valencia, Luis; Wittenauer, Stephan; Yamauchi, Toyoaki; Burton, Bob

    2011-01-01

    The NEA Co-operative Programme for the Exchange of Scientific and Technical Information Concerning Nuclear Installation Decommissioning Projects (CPD) is a joint undertaking of a limited number of organisations actively executing on planning the decommissioning of nuclear facilities. The objective of the CPD is to acquire information from operational experience in decommissioning nuclear installations that is useful for future projects. Although part of the information exchanged within CPD is confidential in nature and is restricted to programme participants, experience of general interest gained under the programme's auspices is released for broader use. Such information is brought to the attention of all NEA members through regular reports to the NEA Radioactive Waste Management Committee (RWMC), as well as through published studies. This report describes generic results obtained by a CPD Task Group analysing the needs for remote technologies. The existing technologies able to meet these needs, the lessons learned and showing where improvements or further developments should be made in this domain. During the D and D process, the handling of highly radioactive materials, the deployment of tools and sensors and the dismantling of components built from many different materials can be a long, labor-intensive process that has the potential for high exposure rates, heat stress and injury to personnel. Mobile robotics systems provide solutions to these hazards. Such remote handling systems are required to perform tasks within budget and on schedule while justifying the expense by a saving in cumulative doses received by project personnel. To reach this goal, the following are additional factors that need to be evaluated when preparing a project: - System and peripherals must be operator-friendly. Ideally, the system must be designed to allow personnel currently available for the D and D project to become trained as operators within a reasonable time frame. - The

  4. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    Energy Technology Data Exchange (ETDEWEB)

    Rossel, R.E., E-mail: ralf.erik.rossel@cern.ch [CERN, Geneva (Switzerland); Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany); Hochschule RheinMain, Fachbereich Design Informatik Medien, Wiesbaden (Germany); Fedosseev, V.N.; Marsh, B.A. [CERN, Geneva (Switzerland); Richter, D. [Hochschule RheinMain, Fachbereich Design Informatik Medien, Wiesbaden (Germany); Rothe, S. [CERN, Geneva (Switzerland); Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany); Wendt, K.D.A. [Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany)

    2013-12-15

    Highlights: • The requirements for continuous and automated RILIS operation are outlined. • Laser wavelength, power, beam position and pulse timing are continuously monitored. • A network-extended LabVIEW-based equipment operation framework was developed. • The system serves as a foundation for collaborative laser spectroscopy data acquisition. • Example applications have been successfully tested with ISOLDE experiment setups. -- Abstract: With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  5. Bathymetry mapping using a GPS-sonar equipped remote control boat: Application in waste stabilisation ponds

    Science.gov (United States)

    Coggins, Liah; Ghadouani, Anas; Ghisalberti, Marco

    2014-05-01

    Traditionally, bathymetry mapping of ponds, lakes and rivers have used techniques which are low in spatial resolution, sometimes subjective in terms of precision and accuracy, labour intensive, and that require a high level of safety precautions. In waste stabilisation ponds (WSP) in particular, sludge heights, and thus sludge volume, are commonly measured using a sludge judge (a clear plastic pipe with length markings). A remote control boat fitted with a GPS-equipped sonar unit can improve the resolution of depth measurements, and reduce safety and labour requirements. Sonar devices equipped with GPS technology, also known as fish finders, are readily available and widely used by people in boating. Through the use of GPS technology in conjunction with sonar, the location and depth can be recorded electronically onto a memory card. However, despite its high applicability to the field, this technology has so far been underutilised. In the case of WSP, the sonar can measure the water depth to the top of the sludge layer, which can then be used to develop contour maps of sludge distribution and to determine sludge volume. The coupling of sonar technology with a remotely operative vehicle has several advantages of traditional measurement techniques, particularly in removing human subjectivity of readings, and the sonar being able to collect more data points in a shorter period of time, and continuously, with a much higher spatial resolution. The GPS-sonar equipped remote control boat has been tested on in excess of 50 WSP within Western Australia, and has shown a very strong correlation (R2 = 0.98) between spot readings taken with the sonar compared to a sludge judge. This has shown that the remote control boat with GPS-sonar device is capable of providing sludge bathymetry with greatly increased spatial resolution, while greatly reducing profiling time. Remotely operated vehicles, such as the one built in this study, are useful for not only determining sludge

  6. Remote-Handled Transuranic Content Codes

    International Nuclear Information System (INIS)

    2001-01-01

    The Remote-Handled Transuranic (RH-TRU) Content Codes (RH-TRUCON) document represents the development of a uniform content code system for RH-TRU waste to be transported in the 72-Bcask. It will be used to convert existing waste form numbers, content codes, and site-specific identification codes into a system that is uniform across the U.S. Department of Energy (DOE) sites.The existing waste codes at the sites can be grouped under uniform content codes without any lossof waste characterization information. The RH-TRUCON document provides an all-encompassing description for each content code and compiles this information for all DOE sites. Compliance with waste generation, processing, and certification procedures at the sites (outlined in this document foreach content code) ensures that prohibited waste forms are not present in the waste. The content code gives an overall description of the RH-TRU waste material in terms of processes and packaging, as well as the generation location. This helps to provide cradle-to-grave traceability of the waste material so that the various actions required to assess its qualification as payload for the 72-B cask can be performed. The content codes also impose restrictions and requirements on the manner in which a payload can be assembled. The RH-TRU Waste Authorized Methods for Payload Control (RH-TRAMPAC), Appendix 1.3.7 of the 72-B Cask Safety Analysis Report (SAR), describes the current governing procedures applicable for the qualification of waste as payload for the 72-B cask. The logic for this classification is presented in the 72-B Cask SAR. Together, these documents (RH-TRUCON, RH-TRAMPAC, and relevant sections of the 72-B Cask SAR) present the foundation and justification for classifying RH-TRU waste into content codes. Only content codes described in thisdocument can be considered for transport in the 72-B cask. Revisions to this document will be madeas additional waste qualifies for transport. Each content code uniquely

  7. Ergonomics and patient handling.

    Science.gov (United States)

    McCoskey, Kelsey L

    2007-11-01

    This study aimed to describe patient-handling demands in inpatient units during a 24-hour period at a military health care facility. A 1-day total population survey described the diverse nature and impact of patient-handling tasks relative to a variety of nursing care units, patient characteristics, and transfer equipment. Productivity baselines were established based on patient dependency, physical exertion, type of transfer, and time spent performing the transfer. Descriptions of the physiological effect of transfers on staff based on patient, transfer, and staff characteristics were developed. Nursing staff response to surveys demonstrated how patient-handling demands are impacted by the staff's physical exertion and level of patient dependency. The findings of this study describe the types of transfers occurring in these inpatient units and the physical exertion and time requirements for these transfers. This description may guide selection of the most appropriate and cost-effective patient-handling equipment required for specific units and patients.

  8. Enhancement of the use of digital mock-ups in the verification and validation process for ITER remote handling systems

    Energy Technology Data Exchange (ETDEWEB)

    Sibois, R., E-mail: romain.sibois@vtt.fi [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland); Salminen, K.; Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland); Mattila, J. [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Määttä, T. [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland)

    2013-10-15

    Highlights: • Verification and validation process for ITER remote handling system. • Verification and validation framework for complex engineering systems. • Verification and validation roadmap for digital modelling phase. • Importance of the product life-cycle management in the verification and validation framework. -- Abstract: The paper is part of the EFDA's programme of European Goal Oriented Training programme on remote handling (RH) “GOT-RH”. The programme aims to train engineers for activities supporting the ITER project and the long-term fusion programme. This paper is written based on the results of a project “verification and validation (V and V) of ITER RH system using digital mock-ups (DMUs)”. The purpose of this project is to study efficient approach of using DMU for the V and V of the ITER RH system design utilizing a system engineering (SE) framework. This paper reviews the definitions of DMU and virtual prototype and overviews the current trends of using virtual prototyping in the industry during the early design phase. Based on the survey of best industrial practices, this paper proposes ways to improve the V and V process for ITER RH system utilizing DMUs.

  9. Comparative analysis of numerical models of pipe handling equipment used in offshore drilling applications

    Energy Technology Data Exchange (ETDEWEB)

    Pawlus, Witold, E-mail: witold.p.pawlus@ieee.org; Ebbesen, Morten K.; Hansen, Michael R.; Choux, Martin; Hovland, Geir [Department of Engineering Sciences, University of Agder, PO Box 509, N-4898 Grimstad (Norway)

    2016-06-08

    Design of offshore drilling equipment is a task that involves not only analysis of strict machine specifications and safety requirements but also consideration of changeable weather conditions and harsh environment. These challenges call for a multidisciplinary approach and make the design process complex. Various modeling software products are currently available to aid design engineers in their effort to test and redesign equipment before it is manufactured. However, given the number of available modeling tools and methods, the choice of the proper modeling methodology becomes not obvious and – in some cases – troublesome. Therefore, we present a comparative analysis of two popular approaches used in modeling and simulation of mechanical systems: multibody and analytical modeling. A gripper arm of the offshore vertical pipe handling machine is selected as a case study for which both models are created. In contrast to some other works, the current paper shows verification of both systems by benchmarking their simulation results against each other. Such criteria as modeling effort and results accuracy are evaluated to assess which modeling strategy is the most suitable given its eventual application.

  10. Risk and cost tradeoffs for remote retrieval of buried waste

    International Nuclear Information System (INIS)

    Hyde, R.A.; Grienbenow, B.E.; Nickelson, D.F.

    1994-01-01

    The Buried Waste Integrated Demonstration is supporting the development, demonstration, testing, and evaluation of a suite of technologies that, when integrated with commercially available technologies, form a comprehensive system for the remediation of radioactive and hazardous buried waste. As a part of the program's technology development, remote retrieval equipment is being developed and tested for the remediation of buried waste. During remedial planning, several factors are considered when choosing remote versus manual retrieval systems. Time that workers are exposed to radioactivity, chemicals, air particulate, and industrial hazards is one consideration. The generation of secondary waste is also a consideration because it amounts to more waste to treat and some wastes may require special handling or treatment. Cost is also a big factor in determining whether remote or manual operations will be used. Other considerations include implementability, effectiveness, and the number of required personnel. This paper investigates each of these areas to show the risk and cost benefits and limitations for remote versus manual retrieval of buried waste

  11. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    International Nuclear Information System (INIS)

    Kinney, Kathryn A.

    2009-01-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ( 252 Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for 252 Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for 252 Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and

  12. Remote maintenance in TOR fast reactor fuel reprocessing facility

    International Nuclear Information System (INIS)

    Eymery, R.; Constant, M.; Malterre, G.

    1986-11-01

    The TOR facility which is undergoing commissioning tests has a capacity of 5 T. HM/year which is enough for reprocessing all the Phenix fuel, with an excess capacity which is to be used for other fast reactors fuels. It is the result of enlargement and renovation of the old Marcoule pilot facility. A good load factor is expected through the use of equipment with increased reliability and easy maintenance. TOR will also be used to test new equipment developed for the large breeder fuel reprocessing plant presently in the design stage. The latter objective is specifically important for the parts of the plant involving mechanical equipment which are located in a new building: TOR 1. High reliability and flexibility will be obtained in this building thanks to the attention given to the integrated remote handling system [fr

  13. Critical element development of standard pipe connector for remote handling

    International Nuclear Information System (INIS)

    Taguchi, Kou; Kakudate, Satoshi; Kanamori, Naokazu; Oka, Kiyoshi; Nakahira, Masataka; Obara, Kenjiro; Tada, Eisuke; Shibanuma, Kiyoshi; Seki, Masahiro

    1994-08-01

    In fusion experimental reactors such as ITER, the in-vessel components such as blanket and divertor are actively cooled and a large number of cooling pipes are located around the core of reactor, where personnel access is prohibited. Mechanical pipe connectors are highly required as standard components for easy and reliable connection/disconnection of cooling pipe by remote handling. For this purpose, a clamping chain type connector has been developed with special mechanisms such as plate springs and guide structures so as to enable concentric and axial movement of clamping chain for easy mounting and dismounting. The basic performance test of a prototypical connector for a 80-A pipe shows sufficient leak tightness and proof pressure capability as well as simple connection/disconnection operation. In addition to the clamp chain type connector, design efforts have been made to develop a quick coupling type connector and a preliminary model of air-actuated quick connector has been fabricated for further investigations. This paper gives the design concept of mechanical pipe connectors such as clamping chain type and quick coupler type, and the basic performance tests results of clamping chain type connector. (author)

  14. Interoperability of remote handling control system software modules at Divertor Test Platform 2 using middleware

    International Nuclear Information System (INIS)

    Tuominen, Janne; Rasi, Teemu; Mattila, Jouni; Siuko, Mikko; Esque, Salvador; Hamilton, David

    2013-01-01

    Highlights: ► The prototype DTP2 remote handling control system is a heterogeneous collection of subsystems, each realizing a functional area of responsibility. ► Middleware provides well-known, reusable solutions to problems, such as heterogeneity, interoperability, security and dependability. ► A middleware solution was selected and integrated with the DTP2 RH control system. The middleware was successfully used to integrate all relevant subsystems and functionality was demonstrated. -- Abstract: This paper focuses on the inter-subsystem communication channels in a prototype distributed remote handling control system at Divertor Test Platform 2 (DTP2). The subsystems are responsible for specific tasks and, over the years, their development has been carried out using various platforms and programming languages. The communication channels between subsystems have different priorities, e.g. very high messaging rate and deterministic timing or high reliability in terms of individual messages. Generally, a control system's communication infrastructure should provide interoperability, scalability, performance and maintainability. An attractive approach to accomplish this is to use a standardized and proven middleware implementation. The selection of a middleware can have a major cost impact in future integration efforts. In this paper we present development done at DTP2 using the Object Management Group's (OMG) standard specification for Data Distribution Service (DDS) for ensuring communications interoperability. DDS has gained a stable foothold especially in the military field. It lacks a centralized broker, thereby avoiding a single-point-of-failure. It also includes an extensive set of Quality of Service (QoS) policies. The standard defines a platform- and programming language independent model and an interoperability wire protocol that enables DDS vendor interoperability, allowing software developers to avoid vendor lock-in situations

  15. MIC damage in a water coolant header for remote process equipment

    International Nuclear Information System (INIS)

    Jenkins, C.F.

    1994-01-01

    Stainless steel water piping used to supply coolant for remote chemical separations equipment developed leaks during low flow conditions resulting from an extended interruption of operations. All the leaks occurred at welds in the bottom zone of the pipe, which was blanketed with silt deposits from the unfiltered well water used for cooling. Ultrasonic, radiographic, and metallographic examinations of leak sites revealed worm hole pitting adjacent to the welds. Seepage at the penetrations was strongly acidic and resulted in corrosion on the external pipe surfaces beneath brown crusty deposits which had developed. Analyses of the water and deposits suggest a strong propensity toward microbiologically influenced corrosion (MIC) and fouling

  16. Nuclear fuel handling apparatus

    International Nuclear Information System (INIS)

    Andrea, C.; Dupen, C.F.G.; Noyes, R.C.

    1977-01-01

    A fuel handling machine for a liquid metal cooled nuclear reactor in which a retractable handling tube and gripper are lowered into the reactor to withdraw a spent fuel assembly into the handling tube. The handling tube containing the fuel assembly immersed in liquid sodium is then withdrawn completely from the reactor into the outer barrel of the handling machine. The machine is then used to transport the spent fuel assembly directly to a remotely located decay tank. The fuel handling machine includes a decay heat removal system which continuously removes heat from the interior of the handling tube and which is capable of operating at its full cooling capacity at all times. The handling tube is supported in the machine from an articulated joint which enables it to readily align itself with the correct position in the core. An emergency sodium supply is carried directly by the machine to provide make up in the event of a loss of sodium from the handling tube during transport to the decay tank. 5 claims, 32 drawing figures

  17. Remote operations in a Fusion Engineering Research Facility (FERF)

    International Nuclear Information System (INIS)

    Doggett, J.N.

    1975-01-01

    The proposed Fusion Engineering Research Facility (FERF) has been designed for the test and evaluation of materials that will be exposed to the hostile radiation environment created by fusion reactors. Because the FERF itself must create a very hostile radiation environment, extensive remote handling procedures will be required as part of its routine operations as well as for both scheduled and unscheduled maintenance. This report analyzes the remote-handling implications of a vertical- rather than horizontal-orientation of the FERF magnet, describes the specific remote-handling facilities of the proposed FERF installation and compares the FERF remote-handling system with several other existing and proposed facilities. (U.S.)

  18. Interim design status and operational report for semiremote handling fixtures: size reduction system

    International Nuclear Information System (INIS)

    Ballard, A.S.

    1977-02-01

    Crushing of HTGR fuel elements is accomplished by a three-stage crushing system consisting of two overhead eccentric jaw crushers, a double-roll crusher, and an oversize reduction system to ensure complete reduction to the desired size. The crushing system is mounted in a special framework which enables gravity flow, eliminates material transport, and minimizes material holdup. The system has been designated UNIFRAME because of the integrated nature of the equipment. This report addresses the demonstration of semiremote maintenance of the crusher in a nonradioactive environment. Although the crusher maintenance system has some remote handling capability inherent in its design, the scope of this initial program is limited to the handling of selected components and allows for manual assistance in certain circumstances. This mode of operation is designated semiremote maintenance and is intended as an effort to gather experience

  19. B cell remote-handled waste shipment cask alternatives study

    International Nuclear Information System (INIS)

    RIDDELLE, J.G.

    1999-01-01

    The decommissioning of the 324 Facility B Cell includes the onsite transport of grouted remote-handled radioactive waste from the 324 Facility to the 200 Areas for disposal. The grouted waste has been transported in the leased ATG Nuclear Services 3-82B Radioactive Waste Shipping Cask (3-82B cask). Because the 3-82B cask is a U.S. Nuclear Regulatory Commission (NRC)-certified Type B shipping cask, the lease cost is high, and the cask operations in the onsite environment may not be optimal. An alternatives study has been performed to develop cost and schedule information on alternative waste transportation systems to assist in determining which system should be used in the future. Five alternatives were identified for evaluation. These included continued lease of the 3-82B cask, fabrication of a new 3-82B cask, development and fabrication of an onsite cask, modification of the existing U.S. Department of Energy-owned cask (OH-142), and the lease of a different commercially available cask. Each alternative was compared to acceptance criteria for use in the B Cell as an initial screening. Only continued leasing of the 3-82B cask, fabrication of a new 3-82B cask, and the development and fabrication of an onsite cask were found to meet all of the B Cell acceptance criteria

  20. Remote maintenance of Compact Ignition Tokamak ex-vessel systems

    International Nuclear Information System (INIS)

    DePew, R.E.; Macdonald, D.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel in the Compact Ignition Tokamak (CIT) will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion device's auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. Throughout the CIT remote maintenance (RM) studies conducted to date, computer modeling has been used extensively to investigate manipulator access in these complex, tightly packed, and cluttered surroundings. A recent refinement of computer modeling involves the use of an intelligent engineering work station for realtime interactive display of task simulations. This paper discusses the use of three-dimensional (3-D) kinematic computer models of the CIT machines that are proving to be powerful tools in our efforts to evaluate RM requirements. This presentation includes a video-taped simulation of remote replacement of a plasma viewing assembly. The simulation illustrates some of the constraints associated with typical RM activities and the ways in which computer modeling enhances the design process. 1 ref., 3 figs

  1. Interoperability of remote handling control system software modules at Divertor Test Platform 2 using middleware

    Energy Technology Data Exchange (ETDEWEB)

    Tuominen, Janne, E-mail: janne.m.tuominen@tut.fi [Tampere University of Technology, Department of Intelligent Hydraulics and Automation, Tampere (Finland); Rasi, Teemu; Mattila, Jouni [Tampere University of Technology, Department of Intelligent Hydraulics and Automation, Tampere (Finland); Siuko, Mikko [VTT, Technical Research Centre of Finland, Tampere (Finland); Esque, Salvador [F4E, Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla2, 08019, Barcelona (Spain); Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► The prototype DTP2 remote handling control system is a heterogeneous collection of subsystems, each realizing a functional area of responsibility. ► Middleware provides well-known, reusable solutions to problems, such as heterogeneity, interoperability, security and dependability. ► A middleware solution was selected and integrated with the DTP2 RH control system. The middleware was successfully used to integrate all relevant subsystems and functionality was demonstrated. -- Abstract: This paper focuses on the inter-subsystem communication channels in a prototype distributed remote handling control system at Divertor Test Platform 2 (DTP2). The subsystems are responsible for specific tasks and, over the years, their development has been carried out using various platforms and programming languages. The communication channels between subsystems have different priorities, e.g. very high messaging rate and deterministic timing or high reliability in terms of individual messages. Generally, a control system's communication infrastructure should provide interoperability, scalability, performance and maintainability. An attractive approach to accomplish this is to use a standardized and proven middleware implementation. The selection of a middleware can have a major cost impact in future integration efforts. In this paper we present development done at DTP2 using the Object Management Group's (OMG) standard specification for Data Distribution Service (DDS) for ensuring communications interoperability. DDS has gained a stable foothold especially in the military field. It lacks a centralized broker, thereby avoiding a single-point-of-failure. It also includes an extensive set of Quality of Service (QoS) policies. The standard defines a platform- and programming language independent model and an interoperability wire protocol that enables DDS vendor interoperability, allowing software developers to avoid vendor lock-in situations.

  2. Remote, under-sodium fuel handling experience at EBR-II

    International Nuclear Information System (INIS)

    King, R.W.; Planchon, H.P.

    1995-01-01

    The EBR-II is a pool-type design; the reactor fuel handling components and entire primary-sodium coolant system are submerged in the primary tank, which is 26 feet in diameter, 26 feet high, and contains 86,000 gallons of sodium. Since the reactor is submerged in sodium, fuel handling operations must be performed blind, making exact positioning and precision control of the fuel handling system components essential. EBR-II operated for 30 years, and the fuel handling system has performed approximately 25,000 fuel transfer operations in that time. Due to termination of the IFR program, EBR-II was shut down on September 30, 1994. In preparation for decommissioning, all fuel in the reactor will be transferred out of EBR-II to interim storage. This intensive fuel handling campaign will last approximately two years, and the number of transfers will be equivalent to the fuel handling done over about nine years of normal reactor operation. With this demand on the system, system reliability will be extremely important. Because of this increased demand, and considering that the system has been operating for about 32 years, system upgrades to increase reliability and efficiency are proceeding. Upgrades to the system to install new digital, solid state controls, and to take advantage of new visualization technology, are underway. Future reactor designs using liquid metal coolant will be able to incorporate imaging technology now being investigated, such as ultraviolet laser imaging and ultrasonic imaging

  3. Remote controlled stud bolt handling device for reactor pressure vessel

    International Nuclear Information System (INIS)

    Shindo, Takenori; Shigehiro, Katsuya; Ito, Morio; Okada, Kenji

    1988-01-01

    In nuclear power stations, at the time of regular inspection, the works of opening and fixing the upper covers of reactor pressure vessels are carried out for inspecting the inside of reactor pressure vessels and exchanging fuel rods. These upper covers are fastened with many stud bolts, therefore, the works of opening and fixing require a large amount of labor, and are done under the restricted condition of wearing protective clothings and masks. Babcock Hitachi K.K. has completed the development of a remotely controlled automatic bolt tightenig device for this purpose, therefore, its outline is reported. The conventional method of these works and the problems in it are described. The design of the new device aimed at the parallel execution of cleaning screw threads, loosening and tightening nuts, and taking off and putting on nuts and washers, thus contributing to the shortening of regular inspection period, the reduction of the radiation exposure of workers, and the decrease of the number of workers. The function, reliability and endurance of the new device were confirmed by the verifying test using a device made for trial. The device is composed of a stand, a rail and four stations each with a cleaning unit, a stud tensioner and a nut handling unit. (K.I.)

  4. Evaluating ITER remote handling middleware concepts

    NARCIS (Netherlands)

    Koning, J. F.; Heemskerk, C. J. M.; Schoen, P.; Smedinga, D.; Boode, A. H.; Hamilton, D. T.

    2013-01-01

    Remote maintenance activities in ITER will be performed by a unique set of hardware systems, supported by an extensive software kit. A layer of middleware will manage and control a complex set of interconnections between teams of operators, hardware devices in various operating theatres, and

  5. Conceptual design of Blanket Remote Handling System for CFETR

    Energy Technology Data Exchange (ETDEWEB)

    Wei, Jianghua, E-mail: weijh@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Song, Yuntao, E-mail: songyt@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); University of Science and Technology of China, Hefei (China); Pei, Kun; Zhao, Wenlong; Zhang, Yu; Cheng, Yong [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China)

    2015-11-15

    Highlights: • The concept for the blanket maintenance is carried out, including three sub-systems. • The basic maintenance procedure for blanket between VV and hot cell is carried out. • The primary kinematics study is used to verify the feasibility of BRHS. • Virtual reality is adopted as another approach to verify the concept design. - Abstract: The China Fusion Engineering Testing Reactor (CFETR), which is a new superconducting tokamak device being designed by China, has a mission to achieve a high duty time (0.3–0.5). To accomplish this great mission, the big modular blanket option has been adopted to achieve the high efficiency of the blanket maintenance. Considering this mission and the large and heavy blanket module, a novel conceptual blanket maintenance system for CFETR has been carried out by us over the past year. This paper presents the conceptual design of the Blanket Remote Handling System (BRHS), which mainly comprises the In-Vessel-Maintenance-System (IVMS), Lifting System and Blanket-Tool-Manipulator System (BTMS). The BRHS implements the extraction and replacement between in-vessel (the blanket module operation configuration location) and ex-vessel (inside of the vertical maintenance cask) by the collaboration of these three sub systems. What is more, this paper represents the blanket maintenance procedure between the docking station (between hot cell building and tokamak building) and inside the vacuum vessel, in tokamak building. Virtual reality technology is also used to verify and optimize our concept design.

  6. Conceptual design of Blanket Remote Handling System for CFETR

    International Nuclear Information System (INIS)

    Wei, Jianghua; Song, Yuntao; Pei, Kun; Zhao, Wenlong; Zhang, Yu; Cheng, Yong

    2015-01-01

    Highlights: • The concept for the blanket maintenance is carried out, including three sub-systems. • The basic maintenance procedure for blanket between VV and hot cell is carried out. • The primary kinematics study is used to verify the feasibility of BRHS. • Virtual reality is adopted as another approach to verify the concept design. - Abstract: The China Fusion Engineering Testing Reactor (CFETR), which is a new superconducting tokamak device being designed by China, has a mission to achieve a high duty time (0.3–0.5). To accomplish this great mission, the big modular blanket option has been adopted to achieve the high efficiency of the blanket maintenance. Considering this mission and the large and heavy blanket module, a novel conceptual blanket maintenance system for CFETR has been carried out by us over the past year. This paper presents the conceptual design of the Blanket Remote Handling System (BRHS), which mainly comprises the In-Vessel-Maintenance-System (IVMS), Lifting System and Blanket-Tool-Manipulator System (BTMS). The BRHS implements the extraction and replacement between in-vessel (the blanket module operation configuration location) and ex-vessel (inside of the vertical maintenance cask) by the collaboration of these three sub systems. What is more, this paper represents the blanket maintenance procedure between the docking station (between hot cell building and tokamak building) and inside the vacuum vessel, in tokamak building. Virtual reality technology is also used to verify and optimize our concept design.

  7. Development of a remote handling system for replacement of armor tiles in the Fusion Experimental Reactor

    International Nuclear Information System (INIS)

    Adachi, J.; Kakudate, S.; Oka, K.; Seki, M.

    1995-01-01

    The armor tiles of the Fusion Experimental Reactor (FER) planned by JAERI are categorized as scheduled maintenance components, since they are damaged by severe heat and particle loads from the plasma during operation. A remote handling system is thus required to replace a large number of tiles rapidly in the highly activated reactor. However, the simple teaching-playback method cannot be adapted to this system because of deflection of the tiles caused by thermal deformation and so on. We have developed a control system using visual feedback control to adapt to this deflection and an end-effector for a single arm. We confirm their performance in tests. (orig.)

  8. Design, fabrication, and mockup testing in the remote maintenance development facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility at the Idaho National Engineering Laboratory was installed and used extensively for full-scale development, mockup, and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques, and remote capabilities were proven workable prior to construction. A description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF is presented

  9. Safe handling of tritium

    International Nuclear Information System (INIS)

    1991-01-01

    The main objective of this publication is to provide practical guidance and recommendations on operational radiation protection aspects related to the safe handling of tritium in laboratories, industrial-scale nuclear facilities such as heavy-water reactors, tritium removal plants and fission fuel reprocessing plants, and facilities for manufacturing commercial tritium-containing devices and radiochemicals. The requirements of nuclear fusion reactors are not addressed specifically, since there is as yet no tritium handling experience with them. However, much of the material covered is expected to be relevant to them as well. Annex III briefly addresses problems in the comparatively small-scale use of tritium at universities, medical research centres and similar establishments. However, the main subject of this publication is the handling of larger quantities of tritium. Operational aspects include designing for tritium safety, safe handling practice, the selection of tritium-compatible materials and equipment, exposure assessment, monitoring, contamination control and the design and use of personal protective equipment. This publication does not address the technologies involved in tritium control and cleanup of effluents, tritium removal, or immobilization and disposal of tritium wastes, nor does it address the environmental behaviour of tritium. Refs, figs and tabs

  10. Overview of progress on the European DEMO remote maintenance strategy

    Energy Technology Data Exchange (ETDEWEB)

    Crofts, Oliver, E-mail: oliver.crofts@ccfe.ac.uk [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Loving, Antony; Iglesias, Daniel [RACE/UKAEA, Culham Science Centre, Abingdon OX14 3DB, Oxon (United Kingdom); Coleman, Matti [EUROfusion Consortium, PPP& T Department, Boltzmannstraße 2, 85748 Garching (Germany); Siuko, Mikko [VTT Technical Research Centre of Finland, PO Box 1000, FI-02044 VTT, Espoo (Finland); Mittwollen, Martin [KIT Institut für Fördertechnik und Logistiksysteme, Gotthard-Franz-Straße 8, Geb.50.38, 76131 Karlsruhe (Germany); Queral, Vicente [CIEMAT Laboratorio Nacional de Fusión, Edif. 66, Avenida Complutense 40, 28040 Madrid (Spain); Vale, Alberto [IST, Instituto Superior Técnico, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Villedieu, Eric [CEA, IRFM, 13108 St Paul lez Durance (France)

    2016-11-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  11. Overview of progress on the European DEMO remote maintenance strategy

    International Nuclear Information System (INIS)

    Crofts, Oliver; Loving, Antony; Iglesias, Daniel; Coleman, Matti; Siuko, Mikko; Mittwollen, Martin; Queral, Vicente; Vale, Alberto; Villedieu, Eric

    2016-01-01

    Highlights: • The remote maintenance strategy is applicable to the range of tokamak and component options currently under consideration in Europe • The remote maintenance development work is concentrating on the application and limits of the immature technologies that pose the greatest risk to the feasibility of the maintenance strategy • Position control during the handling of the in-vessel components is one of the areas of high risk and a system is being developed and will be tested prior to concept design to demonstrate the feasibility and capability of a system capable of real time incorporation of changing kinematic data provided by a structural simulator running in parallel • In-vessel recovery and rescue and the pipe joining technology form two more of the high risk areas where developments are being concentrated - Abstract: The EU-DEMO remote maintenance strategy must be relevant for a range of in-vessel component design options. The remote maintenance project must provide an understanding of the limits of the strategy and technologies so as to inform the developing plant design of the maintenance constraints. A comprehensive set of maintenance requirements has been produced, in conjunction with the plant designers, against which design options can be assessed. The proposed maintenance solutions are based around a strategy that deploys casks above each of the vertical ports to exchange the blanket segments and at each of the divertor ports to exchange the divertor cassettes. The casks deploy remote handling equipment to open and close the vacuum vessel, remove and re-install pipework, and replace the in-vessel components. A technical design risk assessment has shown that the largest risks are common to all of the proposed solutions and that they are associated with two key issues, first; the ability to handle the large blanket and divertor components to the required positional accuracy with limited viewing and position feedback, and second; to

  12. Risk and cost tradeoffs for remote retrieval of buried waste

    Energy Technology Data Exchange (ETDEWEB)

    Hyde, R.A.; Grienbenow, B.E.; Nickelson, D.F.

    1994-12-31

    The Buried Waste Integrated Demonstration is supporting the development, demonstration, testing, and evaluation of a suite of technologies that, when integrated with commercially available technologies, form a comprehensive system for the remediation of radioactive and hazardous buried waste. As a part of the program`s technology development, remote retrieval equipment is being developed and tested for the remediation of buried waste. During remedial planning, several factors are considered when choosing remote versus manual retrieval systems. Time that workers are exposed to radioactivity, chemicals, air particulate, and industrial hazards is one consideration. The generation of secondary waste is also a consideration because it amounts to more waste to treat and some wastes may require special handling or treatment. Cost is also a big factor in determining whether remote or manual operations will be used. Other considerations include implementability, effectiveness, and the number of required personnel. This paper investigates each of these areas to show the risk and cost benefits and limitations for remote versus manual retrieval of buried waste.

  13. 40 CFR 82.36 - Approved refrigerant handling equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment. 82.36 Section 82.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Servicing of Motor Vehicle Air Conditioners § 82.36...-12, Extraction and Recycle Equipment for Mobile Automotive Air-Conditioning Systems, and Standard of...

  14. Apparatus and process for handling dangerous fluent material

    International Nuclear Information System (INIS)

    Stock, A.J.; Christofer, D.E.; Brinza, J.E.

    1976-01-01

    Systems, apparatus and methods are disclosed for disposing of radioactive waste materials by placing them into a container such as a steel drum, together with cement or other solidifying agent and water or other suitable liquid in amounts sufficient to provide eventually a solidified mixture of predetermined amounts of cement or other solidifying agent and radioactive material, closing the drum, agitating the mixture in the drum for mixing the contents, and then storing the drum for at least a period of time sufficient to permit partial decay of radioactive materials or to await available time for shipment. Also disclosed are remotely controlled apparatus for handling both empty and filled drums, for placing the drums in and removing drums from enclosed drumming equipment where they have been filled and agitated, for accurately placing the drums containing radioactive material in storage, and for removing the drums from storage and loading them on a vehicle for transportation. All of these operations are done by remote control with a high degree of safety to the operators and maintenance personnel from radiation and freedom of the ambient from radiation pollution

  15. Remote replacement of TF [toroidal field] and PF [poloidal field] coils for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.; Watkin, D.C.; Hollis, M.J.; DePew, R.E.; Kuban, D.P.

    1990-01-01

    The use of deuterium-tritium fuel in the Compact Ignition Tokamak will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion devices auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. In-vessel remote maintenance included replacement of divertor and first wall hardware, faraday shields, and for an in-vessel inspection system. Provision for remote replacement of a vacuum vessel sector, toroidal field coil or poloidal field ring coil was not included in the project baseline. As a result of recent coil failures experienced at a number of facilities, the CIT project decided to reconsider the question of remote recovery from a coil failure and, in January of 1990, initiated a coil replacement study. This study focused on the technical requirements and impact on fusion machine design associated with remote recovery from any coil failure

  16. Haptic shared control improves hot cell remote handling despite controller inaccuracies

    International Nuclear Information System (INIS)

    Oosterhout, J. van; Abbink, D.A.; Koning, J.F.; Boessenkool, H.; Wildenbeest, J.G.W.; Heemskerk, C.J.M.

    2013-01-01

    Highlights: Haptic shared control is generally based upon perfect environment information. A realistic implementation holds model errors with respect to the environment. Operators were aided with inaccurate guiding forces during a peg-in-hole task. The results showed that small guiding inaccuracies still aid the operator. -- Abstract: A promising solution to improve task performance in ITER hot cell remote handling is the use of haptic shared control. Haptic shared control can assist the human operator along a safe and optimal path with continuous guiding forces from an intelligent autonomous controller. Previous research tested such controllers with accurate knowledge of the environment (giving flawless guiding forces), while in a practical implementation guidance forces will sometimes be flawed due to inaccurate models or sensor information. This research investigated the effect of zero and small (7.5 mm) errors on task performance compared to normal (unguided) operation. In a human factors experiment subjects performed a three dimensional virtual reality peg-in-hole type task (30 mm diameter; 0.1 mm clearance), with and without potentially flawed haptic shared control. The results showed that the presence of guiding forces, despite of small guiding errors, still improved task performance with respect to unguided operations

  17. Haptic shared control improves hot cell remote handling despite controller inaccuracies

    Energy Technology Data Exchange (ETDEWEB)

    Oosterhout, J. van, E-mail: J.vanOosterhout@differ.nl [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Abbink, D.A. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Koning, J.F. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Boessenkool, H. [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Wildenbeest, J.G.W. [Delft University of Technology, Faculty of 3mE, BioMechanical Engineering Department, Mekelweg 2, 2628 CD Delft (Netherlands); Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands); Heemskerk, C.J.M. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk (Netherlands)

    2013-10-15

    Highlights: Haptic shared control is generally based upon perfect environment information. A realistic implementation holds model errors with respect to the environment. Operators were aided with inaccurate guiding forces during a peg-in-hole task. The results showed that small guiding inaccuracies still aid the operator. -- Abstract: A promising solution to improve task performance in ITER hot cell remote handling is the use of haptic shared control. Haptic shared control can assist the human operator along a safe and optimal path with continuous guiding forces from an intelligent autonomous controller. Previous research tested such controllers with accurate knowledge of the environment (giving flawless guiding forces), while in a practical implementation guidance forces will sometimes be flawed due to inaccurate models or sensor information. This research investigated the effect of zero and small (7.5 mm) errors on task performance compared to normal (unguided) operation. In a human factors experiment subjects performed a three dimensional virtual reality peg-in-hole type task (30 mm diameter; 0.1 mm clearance), with and without potentially flawed haptic shared control. The results showed that the presence of guiding forces, despite of small guiding errors, still improved task performance with respect to unguided operations.

  18. Remote controlled transport device

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Ito, Akira; Tada, Eisuke; Sato, Masaki

    1998-01-01

    The present invention provides a device for transporting equipments for maintenance and parts between a maintenance port and a facility for maintenance by remote control in a radioactive material handling facility such as a nuclear power plant. Namely, a power supply bus bar is disposed along a transferring path in order to supply power to a transporting means, and is divided into every region having a predetermined length. Each of the power supply bus bar regions is controlled for the power supply by a control device. Accordingly, the transporting means can be moved and driven successively being independent on every power supply bus bar region. Accordingly, a plurality of transporting means can be operated independently in a transferring path without laying around power cables and control signal cables. (I.S.)

  19. Design, fabrication, and mockup testing in the Remote Maintenance Development Facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility (RMDF) at the Idaho National Engineering Laboratory (INEL) was installed and used extensively for full-scale development, mockup and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques and remote capabilities were proven workable prior to construction. Presented in this paper is a description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF

  20. Remote handling and accelerators

    International Nuclear Information System (INIS)

    Wilson, M.T.

    1983-01-01

    The high-current levels of contemporary and proposed accelerator facilities induce radiation levels into components, requiring consideration be given to maintenance techniques that reduce personnel exposure. Typical components involved include beamstops, targets, collimators, windows, and instrumentation that intercepts the direct beam. Also included are beam extraction, injection, splitting, and kicking regions, as well as purposeful spill areas where beam tails are trimmed and neutral particles are deposited. Scattered beam and secondary particles activate components all along a beamline such as vacuum pipes, magnets, and shielding. Maintenance techniques vary from hands-on to TV-viewed operation using state-of-the-art servomanipulators. Bottom- or side-entry casks are used with thimble-type target and diagnostic assemblies. Long-handled tools are operated from behind shadow shields. Swinging shield doors, unstacking block, and horizontally rolling shield roofs are all used to provide access. Common to all techniques is the need to make operations simple and to provide a means of seeing and reaching the area