  1. Outlook: The Next Twenty Years

    Energy Technology Data Exchange (ETDEWEB)

    Murayama, Hitoshi

    2003-12-07

    I present an outlook for the next twenty years in particle physics. I start with the big questions in our field, broken down into four categories: horizontal, vertical, heaven, and hell. Then I discuss how we attack the bigquestions in each category during the next twenty years. I argue for a synergy between many different approaches taken in our field.

  2. The next twenty years - IAEA's role

    International Nuclear Information System (INIS)

    Tape, G.F.

    1977-01-01

    The twentieth anniversary of an institution is an appropriate time to look back and to ask what has been achieved. It is also an appropriate time to look ahead and to ask what should be the mission for the future. How can the strengths of the International Atomic Energy Agency (IAEA) be best utilized, what new opportunities should be seized upon, and what challenges should the IAEA be prepared to meet in the next twenty years? Forward planning is a very necessary activity in today's world. There are so many demands on national or institutional resources that careful analysis of options is necessary to establish priorities and ultimately to provide for implementation. But such planning must be done carefully with full appreciation for the validity and sensitivity of the input assumptions and data. Furthermore, today's plan, while setting goals and directions, cannot be so inflexible that it cannot be responsive to ever-changing political, economic and technical constraints or opportunities. Thus in looking ahead, the plan must contain provisions for flexibility to provide for further modifications in the light of ever-changing knowledge, attitudes, and world conditions. The experience of the past five years in the energy field, and especially in nuclear energy, underscores this need. In looking ahead for the next twenty years, we are attempting to describe the International Atomic Energy Agency and its role through the twentieth century. In doing so, we are automatically laying the base for the Agency's work going into the twenty-first century. In short, we are trying to visualize a programme that can serve the coming generation and, in doing so, creating a base from which the needs of the succeeding generation can be met. This is a large order and the crystal ball is less than clear. (author)

  3. Environmental consequences of the Chernobyl accident and their remediation: Twenty years of experience

    International Nuclear Information System (INIS)

    Anspaugh, L.R.

    2005-01-01

    health effects attributable to radiation exposure arising from the accident as well as to provide advice on environmental remediation and special health care programmes, and to suggest areas where further research is required. The Forum was created as a contribution to the United Nations' ten years strategy for Chernobyl, launched in 2002 with the publication of Human Consequences of the Chernobyl Nuclear Accident - A Strategy for Recovery. In 2003-2004, two groups of experts from twelve countries, including Belarus, Russia and Ukraine, and from relevant international organizations have assessed the accident's environmental and health consequences. In early 2005, the group Environment, Coordinated by the IAEA, and the group Health, coordinated by the WHO, have presented their reports for Forum consideration. Both reports were considered and approved by the Forum at its meeting on 18-20 April 2005. This meeting also decided, inter alia, 'to consider he approved reports - as a common position of the Forum members, i.e., of the eight United Nations organizations and the three more affected countries, regarding environmental and health consequences of the Chernobyl accident, as well as recommended future actions, i.e., as a consensus within the United Nations system. Tis report presents the findings and recommendations of the Chernobyl Forum concerning Environmental effects of the Chernobyl accident. The Forum's report considering health effects is in process of publication under WHO responsibility. The environmental group of experts was chaired by Dr. Lynn Anspaugh from the University of Utah, USA; the scientific secretary of this group and of the whole Chernobyl Forum activity was Dr. Mikhail Balonov of the Division of Radiation, Transport and Waste Safety, IAEA. In all cases the scientists from the UN organisations, the international community, and the three more affected countries have been able to reach consensus in the preparation of their respective documents. After

  4. Proceedings: Twenty years of energy policy: Looking toward the twenty-first century

    International Nuclear Information System (INIS)

    1992-01-01

    In 1973, immediately following the Arab Oil Embargo, the Energy Resources Center, University of Illinois at Chicago initiated an innovative annual public service program called the Illinois Energy Conference. The objective was to provide a public forum each year to address an energy or environmental issue critical to the state, region and nation. Twenty years have passed since that inaugural program, and during that period we have covered a broad spectrum of issues including energy conservation nuclear power, Illinois coal, energy policy options, natural gas, alternative fuels, new energy technologies, utility deregulation and the National Energy Strategy

  5. Proceedings: Twenty years of energy policy: Looking toward the twenty-first century

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1973, immediately following the Arab Oil Embargo, the Energy Resources Center, University of Illinois at Chicago initiated an innovative annual public service program called the Illinois Energy Conference. The objective was to provide a public forum each year to address an energy or environmental issue critical to the state, region and nation. Twenty years have passed since that inaugural program, and during that period we have covered a broad spectrum of issues including energy conservation nuclear power, Illinois coal, energy policy options, natural gas, alternative fuels, new energy technologies, utility deregulation and the National Energy Strategy.

  6. Radiation curing - twenty five years on

    International Nuclear Information System (INIS)

    Garnett, J.L.

    1995-01-01

    Progress in UV/EB curing during the past twenty five years is briefly reviewed. During this time developments in unique polymer chemistry, novel equipment design and the introduction of relevant educational programmes has enabled radiation curing to become an established technology with specific strengths in certain industries. Possible reasons for the emergence of the technology in these niche markets are discussed. Despite the worldwide recession, radiation curing is shown to be expanding at 5% per annum with the prospect of higher growth with improving economic conditions. (Author)

  7. Safety regulation - twenty years after Chernobyl accident

    International Nuclear Information System (INIS)

    Aleksashin, P.P.; Bukrinskij, A.M.; Gordon, B.G.

    2006-01-01

    Main stages of development, successes, achievements and shortcomings of activity of supervision body after the Chernobyl NPP accident are analysed. The estimation of the realized variations of the functions of the state supervision department is carried out. Results of the twenty year period of improvement of the supervision body are summed up. The measures for increasing the efficiency of the supervision body operation are outlined [ru

  8. Deformation quantization: Twenty years after

    International Nuclear Information System (INIS)

    Sternheimer, Daniel

    1998-01-01

    We first review the historical developments, both in physics and in mathematics, that preceded (and in some sense provided the background of) deformation quantization. Then we describe the birth of the latter theory and its evolution in the past twenty years, insisting on the main conceptual developments and keeping here as much as possible on the physical side. For the physical part the accent is put on its relations to, and relevance for, 'conventional' physics. For the mathematical part we concentrate on the questions of existence and equivalence, including most recent developments for general Poisson manifolds; we touch also noncommutative geometry and index theorems, and relations with group theory, including quantum groups. An extensive (though very incomplete) bibliography is appended and includes background mathematical literature

  9. Twenty years of diffraction at the Tevatron

    International Nuclear Information System (INIS)

    Goulianos, K.; Rockefeller U.

    2005-01-01

    Results on diffractive particle interactions from the Fermilab Tevatron (bar p)p collider are placed in perspective through a QCD inspired phenomenological approach, which exploits scaling and factorization properties observed in data. The results discussed are those obtained by the CDF Collaboration from a comprehensive set of single, double, and multigap soft and hard diffraction processes studied during the twenty year period since 1985, when the CDF diffractive program was proposed and the first Blois Workshop was held

  10. Twenty-five years of simulator training

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    The first training simulator for nuclear power plant personnel in Germany was commissioned twenty-five years ago. The strategy of training by simulators was developed and pursued consistently and continuously in order to ensure sound training of nuclear power plant personnel. The present thirteen simulators cover a broad range of plants. A systematic training concept also helps to ensure a high level of competence and permanent qualification of plant personnel. The anniversary was marked by a festive event at which Erich K. Steiner read a paper on 'The Importance of Simulator Training', and Professor Dr. Adolf Birkhofer spoke about 'Nuclear Technology Education and Training'. (orig.)

  11. Twenty Years of French "Didactique" Viewed from the United States

    Science.gov (United States)

    Kilpatrick, Jeremy

    2003-01-01

    One cannot begin considering the topic of this colloquium without asking, why twenty years? Why not two hundred? Two hundred years ago, Silvestre Franois Lacroix was about to be named chief officer of the Commission Executive de L'Instruction Publique. Out of that experience, together with his long career in instruction, especially as professor of…

  12. Integrated cognitive remediation and standard rehabilitation therapy in patients of schizophrenia: persistence after 5years.

    Science.gov (United States)

    Buonocore, Mariachiara; Spangaro, Marco; Bechi, Margherita; Baraldi, Maria Alice; Cocchi, Federica; Guglielmino, Carmelo; Bianchi, Laura; Mastromatteo, Antonella; Bosia, Marta; Cavallaro, Roberto

    2018-02-01

    Cognitive remediation, often used in combination with standard rehabilitation programs, represents the best available tool to treat cognitive impairments in patients with schizophrenia. However, there are still open questions about durability of effects and generalization of cognitive improvements to functional outcome. This study aims to investigate the persistence of both cognitive and functional effects of combined cognitive remediation plus standard rehabilitation interventions, 5years after completion of the intervention, also comparing different durations of the standard rehabilitation. Sixty patients diagnosed with schizophrenia and previously treated with a 6months intervention, consisting of standard rehabilitation plus 3-months of cognitive remediation, either followed by another year of standard rehabilitation or routine psychiatric treatment, were reassessed with neuropsychological and functional measures 5years after the intervention. Results show that cognitive abilities remained stable after 5years in both groups, while functional performance significantly decreased in patients treated with the 6months intervention only. Data thus suggest that cognitive effects persist even after 5years, while a longer standard rehabilitation following the cognitive remediation program may be needed to achieve a stable functional gain. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. Twenty Years of Basic Vocational Education Provision in Spain: Changes and Trends

    Science.gov (United States)

    Marhuenda-Fluixá, Fernando; Salvà, Francesca; Saurin, Almudena A. Navas; López, Miriam Abiétar

    2015-01-01

    Our contribution attempts to review basic vocational education programmes in Spain over the past 25 years. We intend to compare the evolution of these programmes in terms of conception and conditions of delivery in order to find out how different they are as skill-formation and remedial systems, as well as analysing how different political views…

  14. Time to Loosen the Apron Strings: Cohort-based Evaluation of a Learner-driven Remediation Model at One Medical School.

    Science.gov (United States)

    Bierer, S Beth; Dannefer, Elaine F; Tetzlaff, John E

    2015-09-01

    Remediation in the era of competency-based assessment demands a model that empowers students to improve performance. To examine a remediation model where students, rather than faculty, develop remedial plans to improve performance. Private medical school, 177 medical students. A promotion committee uses student-generated portfolios and faculty referrals to identify struggling students, and has them develop formal remediation plans with personal reflections, improvement strategies, and performance evidence. Students submit reports to document progress until formally released from remediation by the promotion committee. Participants included 177 students from six classes (2009-2014). Twenty-six were placed in remediation, with more referrals occurring during Years 1 or 2 (n = 20, 76 %). Unprofessional behavior represented the most common reason for referral in Years 3-5. Remedial students did not differ from classmates (n = 151) on baseline characteristics (Age, Gender, US citizenship, MCAT) or willingness to recommend their medical school to future students (p < 0.05). Two remedial students did not graduate and three did not pass USLME licensure exams on first attempt. Most remedial students (92 %) generated appropriate plans to address performance deficits. Students can successfully design remedial interventions. This learner-driven remediation model promotes greater autonomy and reinforces self-regulated learning.

  15. Twenty five years of fundamental theory

    International Nuclear Information System (INIS)

    Bell, J.S.

    1980-01-01

    In reviewing the last twenty five years in fundamental physics theory it is stated that there has been no revolution in this field. In the absence of gravitation, Lorentz invariance remains a requirement on fundamental laws. Einstein's theory of gravitation inspires increasing conviction on the astronomical scale. Quantum theory remains the framework for all serious effort in microphysics, and quantum electrodynamics remains the model of a fully articulated microphysical theory, completely successful in its domain. However,a number of ideas have appeared, of great theoretical interest and some phenomenological success, which may well contribute to the next decisive step. Recent work on the following topics is mentioned; gravitational radiation, singularites, black body radiation from black holes, gauge and hidden symmetry in quantum electrodynamics, the renormalization of electromagnetic and weak interaction theory, non-Abelian gauge theories, magnetic monopoles as the most striking example of solitons, and supersymmetry. (UK)

  16. Twenty years of society of medical informatics of b&h and the journal acta informatica medica.

    Science.gov (United States)

    Masic, Izet

    2012-03-01

    In 2012, Health/Medical informatics profession celebrates five jubilees in Bosnia and Herzegovina: a) Thirty five years from the introduction of the first automatic manipulation of data; b) Twenty five years from establishing Society for Medical Informatics BiH; c) Twenty years from establishing scientific and professional journal of the Society for Medical Informatics of Bosnia and Herzegovina "Acta Informatica Medica"; d) Twenty years from establishing first Cathdra for Medical Informatics on biomedical faculties in Bosnia and Herzegovina and e) Ten years from the introduction of "Distance learning" in medical curriculum. All of the five mentioned activities in the area of Medical informatics had special importance and gave appropriate contribution in the development of Health/Medical informatics in Bosnia And Herzegovina.

  17. Investigating the Twenty Year Lag in the Vocational Rehabilitation Process.

    Science.gov (United States)

    Lowitt, Julian

    In the rehabilitation workshop there is insufficient attention to job development oriented to the current and future needs of industry. Many types of work which were done in vocational workshops in contract from industrial firms are now done by automation. Semiskilled labor is thus in diminished demand. There is a twenty year lag in the industrial…

  18. Medicinal plants used as home remedies: a family survey by first year medical students.

    Science.gov (United States)

    Sewani-Rusike, Constance R; Mammen, Marykutty

    2014-01-01

    There is a hierarchical organisation of knowledge in the use of medicinal plants in communities. Medicinal use knowledge starts in the home and is passed on to family members. Next in the hierarchy are neighbours, village elders and finally, traditional healers being the most knowledgeable. For primary health care this hierarchy is actively followed in seeking remedies for ailments. This study was a survey of medicinal plant knowledge from family members of 1(st) year medical students registered at Walter Sisulu University. A total of 206 first year medical students participated in this study in 2010 and 2011. Results revealed 47 species used as home remedies, 32% of which are food plants. Leaves and roots were reported as most commonly used. The top five ailments managed at home were gastrointestinal problems (25 plants), wounds (19 plants), respiratory tract problems (19 plants), infections, including sexually transmitted diseases (19 plants) and pain including headaches (19 plants). Chronic diseases such as hypertension, diabetes, cancer and reproductive ailments also formed a large group of diseases self-managed at home (29 plants). Family members hold knowledge of medicinal plant use. From this study, first year medical students were made aware of the relationship between common ailments and associated home remedies. This study forms a basis for further study of medicinal plants to validate their use as medicinal remedies.

  19. Twenty five years of clusters -- from Bochum to Strasbourg

    International Nuclear Information System (INIS)

    Betts, R.R.; Chicago Univ., IL

    1994-01-01

    Developments in the area of clustering aspects of nuclear structure and reactions over the past twenty-five years are reviewed. The viewpoint is that the nucleus is an assembly of clusters. The question is whether clusters actually exist in the nucleus. Although there is abundant evidence for this in light nuclei, the situation for more complex clusters in heavier nuclei is much worse. Differential cross sections for scattering of alpha particles and heavy ions are shown

  20. After Twenty-Five Years: A Twenty-Five Year Follow-up Study of Middlesex County Vocational and Technical High School Graduates of the Class of June 1953.

    Science.gov (United States)

    Rogers, William; Zanzalari, J. Henry

    A twenty-five-year follow-up study was conducted to determine the occupational, educational, marital and armed forces experiences of the graduating class of 1953 from the Middlesex County Vocational and Technical high schools located in New Brunswick, Perth, Amboy, and Woodbridge, New Jersey. Data, in the form of questionnaire responses, were…

  1. Environmental consequences of the Chernobyl accident and their remediation: Twenty years of experience. Report of the Chernobyl Forum Expert Group 'Environment'

    International Nuclear Information System (INIS)

    2008-01-01

    countries were also affected as a result of the atmospheric transfer of radioactive material. These countries also encountered problems in the radiation protection of their populations, but to a lesser extent than the three most affected countries. Although the accident occurred nearly two decades ago, controversy still surrounds the real impact of the disaster. Therefore the IAEA, in cooperation with the Food and Agriculture Organization of the United Nations (FAO), the United Nations Development Programme (UNDP), the United Nations Environment Programme (UNEP), the United Nations Office for the Coordination of Humanitarian Affairs (OCHA), the United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR), the World Health Organization (WHO) and the World Bank, as well as the competent authorities of Belarus, the Russian Federation and Ukraine, established the Chernobyl Forum in 2003. The mission of the Forum was - through a series of managerial and expert meetings - to generate 'authoritative consensual statements' on the environmental consequences and health effects attributable to radiation exposure arising from the accident, as well as to provide advice on environmental remediation and special health care programmes, and to suggest areas in which further research is required. The Forum was created as a contribution to the United Nations' ten year strategy for Chernobyl, launched in 2002 with the publication of Human Consequences of the Chernobyl Nuclear Accident - A Strategy for Recovery. Over a two year period, two groups of experts from 12 countries, including Belarus, the Russian Federation and Ukraine, and from relevant international organizations, assessed the accident's environmental and health consequences. In early 2005 the Expert Group 'Environment', coordinated by the IAEA, and the Expert Group 'Health', coordinated by the WHO, presented their reports for the consideration of the Chernobyl Forum. Both reports were considered and approved by

  2. Twenty years of analysis of light elements at the LARN

    International Nuclear Information System (INIS)

    Demortier, G.

    1992-01-01

    We review the applications of ion beam analysis of light elements performed in the LARN during the last twenty years. The works mainly concern: helium bubbles in aluminum foils, Li in aluminum alloys, carbon in high purity MgO crystals and in olivines, nitrogen bubbles in glass and implanted nitrogen in iron and aluminum, oxygen in YBaCuO superconductors, fluorine in tooth enamel and implanted fluorine in metals. (orig.)

  3. Summary report of Hanford Site well remediation and decommissioning activities for fiscal year 1994

    International Nuclear Information System (INIS)

    Reynolds, K.D.

    1994-01-01

    Remediation and decommissioning of Hanford Site wells has become an integral part of Hanford Site Environmental Restoration (ER) and Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring programs. A well remediation and decommissioning program was funded and implemented in fiscal year (FY) 1993 under the RCRA and Operational Monitoring (ROM) Program. Funding for this work increased in FY 1994. In FY 1994 well decommissioning activities conducted for the ROM program were centered around the 200 West Area; activities for the ER program were centered in the Fitzner/Eberhart Arid Land Ecology (ALE) (Reserve) unit and the Wahluke Slope (North Slope) area. A total of 116 wells and test borings were decommissioned between the two programs during FY 1994. Additionally, five wells were identified as in need of remediation and were successfully brought into compliance with regulatory requirements. As Hanford Site restoration and remediation efforts increase in scope, the well decommissioning program will remain dynamic. The program will aggressively seek to fulfill the needs of the various environmental cleanup and groundwater/vadose monitoring programs. Wells that do not meet regulatory requirements for preservation will continually be identified and remediated or decommissioned accordingly

  4. Over Twenty Years Of Experience In ITU TRIGA MARK-II Reactor

    International Nuclear Information System (INIS)

    Yavuz, Hasbi

    2008-01-01

    I.T.U. TRIGA MARK-II Training and Research Reactor, rated at 250 kW steady-state and 1200 MW pulsing power is the only research and training reactor owned and operated by a university in Turkey. Reactor has been operating since March 11, 1979; therefore the reactor has been operating successfully for more than twenty years. Over the twenty years of operation: - The tangential beam tube was equipped with a neutron radiography facility, which consists of a divergent collimator and exposure room; - A computerized data acquisition system was designed and installed such that all parameters of the reactor, which are observed from the console, could be monitored both in normal and pulse operations; - An electrical power calibration system was built for the thermal power calibration of the reactor; - Publications related with I.T.U. TRIGA MARK-II Training and Research Reactor are listed in Appendix; - Two majors undesired shutdown occurred; - The I.T.U. TRIGA MARK-II Training and Research Reactor is still in operation at the moment. (authors)

  5. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    Energy Technology Data Exchange (ETDEWEB)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  6. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    International Nuclear Information System (INIS)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal

  7. Twenty years of JHEP

    International Nuclear Information System (INIS)

    Amati, Daniele; Bonora, Loriano

    2017-01-01

    On July 1st of twenty years ago we launched the first issue of JHEP. It was a real challenge to try the adventure of a scientific journal thought and managed by scientists, independent of private or institutional publishers. The idea was that physicists who were performing the work, writing the papers, and refereeing those of their peers, could also edit them in an electronic format. Thus, at a limited cost which could be handled by academic or scientific institutions, giving open access to the published information, and avoiding the heavy burden at that time placed on our libraries. In order to avoid the failure that - as we well remember was predicted to us by publishing companies and institutions, we needed the active support of the scientific community. A support in collaborating to the scrutiny of papers and scientific policies but, mainly, in sending to us their good papers. We contacted in that sense several of our most active and renowned colleagues, restricting of course to our high energy physics field. We received many enthusiastic responses as can be specifically seen from the papers that appear in the first issues of the journal, as well as the respected names listed in the advisory and in the editorial boards featuring in the opening page of the first issue of JHEP attached to this letter. We were optimists, but perhaps not as much as to foresee the success of the journal, which, in his first 20 years, turned out to be one of the most (if not the most) prestigious one in our field. Success for which --- as first project chairman and executive editor - we must essentially thank the scientific community who supported JHEP by considering it ''their journal'', as was our intention from the start. In this occasion we would like to recall the important contribution of Marco Fabbrichesi who designed the software on which the journal is based, and the technical personnel who implemented it and made it work. It is our pleasure to mention

  8. Twenty Years of Australian Educational Computing: A Call for Modern Traditionalism

    Science.gov (United States)

    McDougall, Anne

    2005-01-01

    This article reflects on twenty or more years of development and research in educational computing. It argues that the emphasis on exploiting the technology in the service of contemporary ideas about learning held by many of the early workers has been lost to a focus on the technology itself and its capabilities. In schools this has led to an…

  9. Trends in CPAP adherence over twenty years of data collection: a flattened curve.

    Science.gov (United States)

    Rotenberg, Brian W; Murariu, Dorian; Pang, Kenny P

    2016-08-19

    Obstructive sleep apnea (OSA) is a common disorder, and continuous airway positive pressure (CPAP) is considered to be the gold standard of therapy. CPAP however is known to have problems with adherence, with many patients eventually abandoning the device. The purpose of this paper is to assess secular trends in CPAP adherence over the long term to see if there have been meaningful improvements in adherence in light of the multiple interventions proposed to do so. A comprehensive systematic literature review was conducted using the Medline-Ovid, Embase, and Pubmed databases, searching for data regarding CPAP adherence over a twenty year timeframe (1994-2015). Data was assessed for quality and then extracted. The main outcome measure was reported CPAP non-adherence. Secondary outcomes included changes in CPAP non-adherence when comparing short versus long-term, and changes in terms of behavioral counseling. Eighty-two papers met study inclusion/exclusion criteria. The overall CPAP non-adherence rate based on a 7-h/night sleep time that was reported in studies conducted over the twenty year time frame was 34.1 %. There was no significant improvement over the time frame. Behavioral intervention improved adherence rates by ~1 h per night on average. The rate of CPAP adherence remains persistently low over twenty years worth of reported data. No clinically significant improvement in CPAP adherence was seen even in recent years despite efforts toward behavioral intervention and patient coaching. This low rate of adherence is problematic, and calls into question the concept of CPAP as gold-standard of therapy for OSA.

  10. Environmental consequences of the Chernobyl accident and their remediation: Twenty years of experience. Report of the Chernobyl Forum Expert Group 'Environment'

    International Nuclear Information System (INIS)

    2006-01-01

    Chernobyl Forum in 2003. The mission of the Forum was - through a series of managerial and expert meetings - to generate 'authoritative consensual statements' on the environmental consequences and health effects attributable to radiation exposure arising from the accident, as well as to provide advice on environmental remediation and special health care programmes, and to suggest areas in which further research is required. The Forum was created as a contribution to the United Nations' ten year strategy for Chernobyl, launched in 2002 with the publication of Human Consequences of the Chernobyl Nuclear Accident - A Strategy for Recovery. Over a two year period, two groups of experts from 12 countries, including Belarus, the Russian Federation and Ukraine, and from relevant international organizations, assessed the accident's environmental and health consequences. In early 2005 the Expert Group 'Environment', coordinated by the IAEA, and the Expert Group 'Health', coordinated by the WHO, presented their reports for the consideration of the Chernobyl Forum. Both reports were considered and approved by the Forum at its meeting on 18-20 April 2005. This meeting also decided, inter alia, 'to consider the approved reports... as a common position of the Forum members, i.e., of the eight United Nations organizations and the three most affected countries, regarding the environmental and health consequences of the Chernobyl accident, as well as recommended future actions, i.e., as a consensus within the United Nations system.' This report presents the findings and recommendations of the Chernobyl Forum concerning the environmental effects of the Chernobyl accident. The Forum's report considering the health effects of the Chernobyl accident is being published by the WHO

  11. Remediating Remediation: From Basic Writing to Writing across the Curriculum

    Science.gov (United States)

    Faulkner, Melissa

    2013-01-01

    This article challenges faculty members and administrators to rethink current definitions of remediation. First year college students are increasingly placed into basic writing courses due to a perceived inability to use English grammar correctly, but it must be acknowledged that all students will encounter the need for remediation as they attempt…

  12. Twenty years of energy policy: What should we have learned?

    International Nuclear Information System (INIS)

    Greene, D.L.

    1994-07-01

    This report examines the past twenty years of energy market events and energy policies to determine what may be useful for the future. The author focuses on two important lessons that should have been learned but which the author feels have been seriously misunderstood. The first is that oil price shocks were a very big and very real problem for oil importing countries, a problem the has not gone away. The second is that automobile fuel economy regulation has worked and worked effectively to reduce oil consumption and the externalities associated with it, and can still work effectively in the future

  13. Twenty years of energy policy: What should we have learned?

    Energy Technology Data Exchange (ETDEWEB)

    Greene, D.L. [Oak Ridge National Lab., TN (United States). Center for Transportation Analysis

    1994-07-01

    This report examines the past twenty years of energy market events and energy policies to determine what may be useful for the future. The author focuses on two important lessons that should have been learned but which the author feels have been seriously misunderstood. The first is that oil price shocks were a very big and very real problem for oil importing countries, a problem the has not gone away. The second is that automobile fuel economy regulation has worked and worked effectively to reduce oil consumption and the externalities associated with it, and can still work effectively in the future.

  14. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1984-12-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project FY 1984 major accomplishments are summarized. Twenty-five percent of the processing site remedial actions at Canonsburg, PA, were completed. Remedial action on 118 vicinity properties at four designated locations were initiated and survey and inclusion activities on a total of 420 vicinity properties were completed. The Environmental Impact Statement (EIS) for Salt Lake City, UT, and the Environmental Assessment (EA) for Shiprock, NM were published, and the preliminary draft EIS for Durango, CO, was prepared. Remedial Action Plans (RAPs) for Salt Lake City, UT, and Shiprock, NM were completed, and draft RAPs for Gunnison, CO, and Riverton, WY were prepared. Cooperative agreements with Oregon, Wyoming, and South Dakota were executed, and the Utah cooperative agreement was modified to assign the construction management responsibility to the state. An Interagency Agreement with TVA for disposal of the Edgemont vicinity property material was executed

  15. Twenty-five years of post-Bretton Woods experience: some lessons

    Directory of Open Access Journals (Sweden)

    H. ASKARI

    1999-03-01

    Full Text Available In 1971 many academic economists were predicting that the Bretton Woods system of fixed parities would collapse. Some, most notably Milton Friedman, became excited about the possibility of a floating system because the benefits of international capital mobility can only be achieved through the flexibility in the exchange rate. These economists argued that a floating exchange rate system can ensure positive results more than the fixed parities system. Twenty-five years later, however, there is still no consensus on the matter. The author reviews the post-Bretton Woods experience to highlight some policies and approaches that might be helpful for the future.

  16. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Appendix A

    International Nuclear Information System (INIS)

    1995-09-01

    This document is a compilation of data relating to the Tank Waste Remediation System Multi-Year Program. Topics discussed include: management systems; waste volume, transfer and evaporation management; transition of 200 East and West areas; ferricyanide, volatile organic vapor, and flammable gas management; waste characterization; retrieval from SSTs and DSTs; heat management; interim storage; low-level and high-level radioactive waste management; and tank farm closure

  17. Twenty Years of Basic Vocational Education Provision in Spain: Changes and Trends

    Directory of Open Access Journals (Sweden)

    Fernando Marhuenda

    2015-08-01

    Full Text Available Our contribution attempts to review basic vocational education programmes in Spain over the past 25 years. We intend to compare the evolution of these programmes in terms of conception and conditions of delivery in order to find out how different they are as skill-formation and remedial systems, as well as analysing how different political views have an impact upon such provision. We will focus on the current programmes in two regions in Spain where tourism is the main economic strength and source of employment. The authors have been working on several research projects investigating these issues since the late 1990s and we are currently working on two of them.

  18. TWENTY-ONE-YEAR EXTENSION PROJECT PERFORMANCE "LET'S BREASTFEEDING, MOMMY?"

    Directory of Open Access Journals (Sweden)

    Marizete Argolo Teixeira

    2017-05-01

    Full Text Available Research aiming to describe the actions that were developed by the Extension Project "Let's breastfeed, Mom?" During the 21 years of its performance in Jequié / Bahia and identify the difficulties, facilities and progress of the project. This is a descriptive, quantitative-qualitative study. The data were collected in the archived project documents, analyzed through descriptive statistics and content analysis. The results showed that 8,923 registered postpartum women with educational activities and 1,313 domiciliary visits were carried out, as the main actions carried out by the project. The difficulties were: lack of consumer / permanent materials and human resources; As facilities: responsibility and commitment of the members of the project, as well as the support of the transportation service of the institution. The advances were the elaboration of the research project, with insertion of research fellows, creation of the webpage and the logo. It is necessary to reflect on the difficulties and propose measures to remedy them and thus continue to contribute to the promotion, protection and support of breastfeeding in the Municipality, contributing to the reduction of infant morbidity and mortality

  19. A survey of ethnoveterinary botanical remedies in Ogun State and ...

    African Journals Online (AJOL)

    Twenty four villages were visited during a cross sectional survey of ethno veterinary botanical remedies used for the management of animal diseases in four local government areas randomly selected cutting across the four geopolitical zones in Ogun State. A total of 323 households were purposively selected and ...

  20. Twenty years of operation of Ljubljana's TRIGA Mark II reactor

    International Nuclear Information System (INIS)

    Dimic, V.

    1986-01-01

    Twenty years have now passed since the start of the TRIGA Mark II reactor in Ljubljana. The reactor was critical on May 31, 1966. The total energy produced until the end of May 1986 was 14.048 MWh or 585 MWd. For the first 14 years (until 1981) the yearly energy produced was about 600 MWh, since 1981 the yearly energy produced was 1000 MWh when a routine radioactive isotopes production started for medical use as well as other industrial applications, such as doping and irradiation with fast neutrons of silicon monocrystals, production of level indicators (irradiated cobalt wire), production of radioactive iridium for gamma-radiography, leak detection in pipes by sodium, etc. Besides these, applied research around the reactor is being conducted in the following main fields, where- many unique methods have been developed or have found their way into the local industry or hospitals: neutron radiography, neutron induced auto-radiography using solid state nuclear track detectors, nondestructive methods for assessment of nuclear burn-up, neutron dosimetry, calculation of core burn-up for the optimal in-core fuel management strategy. The solvent extraction method was developed for the everyday production of 99m Tc, which is the most widely used radionuclide in diagnostic nuclear medicine. The methods were developed for the production of the following isotopes: 18 F, 85m Kr, 24 Na, 82 Br, 64 Zn, 125 I. Neutron activation analysis represents one of the major usages for the TRIGA reactor. Basic research is being conducted in the following main fields: solid state physics (elastic and inelastic scattering of the neutrons), neutron dosimetry, neutron radiography, reactor physics and neutron activation analysis. The reactor is used very extensively as a main instrument in the Reactor Training Centre in Ljubljana where manpower training for our nuclear power plant and other organisations has been performed. Although the reactor was designed very carefully in order to be used for

  1. Remediation: Higher Education's Bridge to Nowhere

    Science.gov (United States)

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  2. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    International Nuclear Information System (INIS)

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work

  3. Twenty years of environmental opposition in the electric sector

    International Nuclear Information System (INIS)

    Molocchi, Andrea

    1997-01-01

    This article aims to provide a framework for analysing social opposition In Italy against the construction and management of electric power plants (nuclear and thermoelectric) and big electricity power lines in the past twenty years. First The author provide a history of social environmental opposition in the electric sector. This is followed by a typology of reason for opposition in terms of risk perception, which has been applied to about forty cases of social opposition against electric plants. This study an original experimental methodology which could also yield useful results when applied to other complex social phenomena. In the third phase of the study the author analyse the various roles of the social and institutional actors involved in the opposition, and the obstacles to future consensus building. The most interesting result of the study is the not only social but political nature opposition. This factor necessitates integration of the traditional individual risk perception approach with an approach which analyses political and social action of NGO's

  4. Achievements in the past twenty years and perspective outlook of crop space breeding in China

    International Nuclear Information System (INIS)

    Liu Luxiang; Guo Huijun; Zhao Linshu; Gu Jiayu; Zhao Shirong

    2007-01-01

    Space breeding is a novel effective approach to crop mutational improvement, which was firstly founded by the chinese scientists in 1987. A national collaborative research network has been established and significant achievements have been made during the past twenty years. More than forty new mutant varieties derived from space mutagenesis in rice, wheat, cotton, sweet pepper, tomato, sesame and alfalfa have been developed, officially released and put into production. A series of useful rare mutant germplasms which might make a great breakthrough in crop grain yield and/or quality improvement have been obtained. Technique innovations in space breeding and ground simulation of space environmental factors have been made good progresses. Intellective property right protection and industrialization of space mutation techniques and mutant varieties, exploration of the mechanism of space mutation induction have also been stably advanced. In this paper, the main achievements of crop space breeding in the past twenty years had been reviewed. The perspective development strategies of space breeding were also discussed. (authors)

  5. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information

  6. The covered distance for twenty five years of the Manche waste storage 1969 - 1994

    International Nuclear Information System (INIS)

    Gourden, J.M.

    2001-01-01

    The twenty five years of the Manche plant,are narrated with the difficulties of the beginning, the problems coming from leaks or runoff that have led to improvement in the knowledge of radioactive waste behaviour and the solutions that have been brought. It is from the building of the plant until the radioactive waste management that is related in this book. (N.C.)

  7. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  8. Twenty years' application of agricultural countermeasures following the Chernobyl accident: lessons learned

    International Nuclear Information System (INIS)

    Fesenko, S V; Alexakhin, R M; Balonov, M I; Bogdevich, I M; Howard, B J; Kashparov, V A; Sanzharova, N I; Panov, A V; Voigt, G; Zhuchenka, Yu M

    2006-01-01

    The accident at the Chernobyl NPP (nuclear power plant) was the most serious ever to have occurred in the history of nuclear energy. The consumption of contaminated foodstuffs in affected areas was a significant source of irradiation for the population. A wide range of different countermeasures have been used to reduce exposure of people and to mitigate the consequences of the Chernobyl accident for agriculture in affected regions in Belarus, Russia and Ukraine. This paper for the first time summarises key data on countermeasure application over twenty years for all three countries and describes key lessons learnt from this experience. (review)

  9. Twenty years of „post-communism”: the radiography of a political failure

    Directory of Open Access Journals (Sweden)

    Aurora Martin

    2011-11-01

    Full Text Available This empirical view on the current „state” of Romania has as main objective to emphasize that the contemporary economic crisis actually revealed some other escalated crises in the very heart of the Romanian society. The vicious circle determined by three crises – one political, another social-institutional and last, but not least, a cultural one, continuously weakened the state for the last twenty years. Romania will overcome the economic crisis but the key for walking out of the above-mentioned circle would be the real transformation of its core systems – political, institutional and educational.

  10. Twenty years on: Poverty and hardship in urban Fiji

    Directory of Open Access Journals (Sweden)

    Jenny Bryant-Tokalau

    2012-09-01

    Full Text Available Through ‘official statistics’, academic and donor interpretations as well as the eyes of Suva residents, this paper presents an overview and case study of twenty years of growing poverty and hardship in the contemporary Pacific. Focusing on the past two decades, the paper notes how much, and yet so little, has changed for those attempting to make a living in the rapidly developing towns and cities. Changing interpretations of poverty and hardship are presented, moving from the ‘no such thing’ view, to simplification, and finally to an understanding that Pacific island countries, especially Fiji, are no longer an ‘extension’ of Australia and New Zealand, but independent nations actively trying to find solutions to their issues of economic, social and political hardship whilst facing challenges to traditional institutions and networks. Fiji is in some respects a very particular case as almost half of the population has limited access to secure land, but the very nature of that vulnerability to hardship and poverty holds useful lessons for wider analysis.

  11. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    International Nuclear Information System (INIS)

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state's 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs

  12. Uranium Mill Tailings Remedial Action fiscal year 1992 roadmap

    International Nuclear Information System (INIS)

    1993-02-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is funded and managed as two separate projects: Surface remediation (UMTRA-S) and Groundwater compliance (UMTRA-G). Surface remediation is a Major System Acquisition and has been completed at 10 sites, 7 sites are under construction, and 7 sites are in the planning stage. The planning stages of the UMTRA-G Project, a major project, began in April 1991. A programmatic environmental impact statement (PEIS) has been started. Site characterization work and baseline risk assessment will begin FY 1993. Thus, the UMTRA-S Project is a mature and ongoing program with the roles of various organizations well defined, while the UMTRA-G Project is still being formulated and the interfaces between the DOE, states and tribes, and the EPA are being established. The Office of Environmental Restoration and Waste Management (EM) directed that all projects under its authority develop roadmaps for their activities. The UMTRA Project Roadmap was developed by the UMTRA Project Office with input from the TAC, RAC, the GJPO, and assistance from SAIC. A single roadmap has been prepared for both the UMTRA-S and UMTRA-G Projects. This was deemed appropriate due to the close relationship between the projects and to the fact that the same Government and contractor personnel are preparing the roadmaps. Roadmap development is a planning process that focuses on issue identification, root-cause analysis, and issues resolution. The methodology is divided into three phases: assessment, analysis, and issues resolution

  13. Comparison of doses, before and after remedial action

    International Nuclear Information System (INIS)

    Wallo, A. III

    1988-01-01

    The Division of Facility and Site Decommissioning Projects at DOE-Headquarters is evaluating potential doses from vicinity properties before and after remedial action at several sites using the RESRAD computer code. A preliminary review was completed for nineteen Colonie vicinity properties. This review indicated potential doses before remedial action at these sites ranged from about 43 to 2 mrem/year and after remediation between 5 and 0 mrem/year. These estimates indicate the conservatism in the DOE-derived soil decontamination remedial action. Following remedial action, the potential doses are on the order of those being considered to be below regulatory concern by EPA and NRC. The estimates made for these sites are still conservative due to the method used to determine the source term. More realistic assessments of source terms are anticipate dot significantly affect the after-remedial-action doses, possibly lowering them all to below 1 mrem/year. This evaluation is being refined with more realistic estimates of the source term, for all of the Colonie vicinity properties. Once the Colonie vicinity properties are completed, at least three other sites will be evaluated. It is hoped that this information will provide added confidence in the remedial action guidelines and more general acceptance of the guidelines by the EPA and others

  14. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  15. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  16. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    International Nuclear Information System (INIS)

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized

  17. Twenty years of RERTR in Russia: Past, present and future

    International Nuclear Information System (INIS)

    Arkhangelsky, N.

    2000-01-01

    The Russian RERTR Program started approximately 20 years ago. The USSR always supported principles and goals of the policy of nonproliferation and at the end of 70's the Soviet Government decided to create such national program. Twenty years is the sufficient time to estimate preliminary results of the realization of the program and its prospects on the future. After the first successes of the program, when the enrichment of uranium in fuel elements for foreign supplies was reduced from 80 % to 36 %, the realization of the program was suspended in connection with financial difficulties. But in the beginning of the 90's the Program has received a new pulse connected to the inclusion of Russian scientists and engineers in the international Program. Now basic directions in development of new kinds of fuel are development of works on fuel on a basis dioxide of uranium and development of fuel on a basis of U-Mo alloy. In the future to basic goals of the program the problem of the management of the spent nuclear fuel should be added. The management of HEU at the final stage of a fuel cycle becomes an important objective of the program, since the basic amount of HEU is concentrated in storage of SNF. (author)

  18. Remedial chemo-radiotherapy for mediastinum and pleuro-pulmonary metastases of an anal canal cancer; Chimio-radiotherapie de rattrapage pour metastases mediastinales et pleuropulmonaires d'un cancer du canal anal

    Energy Technology Data Exchange (ETDEWEB)

    Moreau, M.V.; Tournier-Rangeard, L.; Peiffert, D. [Centre Alexis-Vautrin, Service de Radiotherapie, 54 - Nancy (France)

    2006-11-15

    A fifty seven years woman received ten years ago, a radiotherapy with iodine for a Basedow hyperthyroidism. In 2001 she was damaged bu an epidermoid carcinoma of the anal canal. Radiotherapy, then chemotherapy, then brachytherapy. During three years noting special to declare. In 2004, respiratory insufficiency leads her to consult. A PET scanography shows an inter-aortic-pulmonary hyper-metabolism. Cortico-therapy and radiotherapy by X rays are delivered. In front of the positive response a new chemoradiotherapy and three cycles of chemotherapy are made. After twenty five months the patient is in complete remission of her metastases after this remedial treatment. This observation illustrates the radiosensitivity of the anal canal cancers of including metastases situation, the interest of the PET scanography and utility of a remedial treatment with curative goal. (N.C.)

  19. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    International Nuclear Information System (INIS)

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized

  20. To fail is human: remediating remediation in medical education.

    Science.gov (United States)

    Kalet, Adina; Chou, Calvin L; Ellaway, Rachel H

    2017-12-01

    Remediating failing medical learners has traditionally been a craft activity responding to individual learner and remediator circumstances. Although there have been moves towards more systematic approaches to remediation (at least at the institutional level), these changes have tended to focus on due process and defensibility rather than on educational principles. As remediation practice evolves, there is a growing need for common theoretical and systems-based perspectives to guide this work. This paper steps back from the practicalities of remediation practice to take a critical systems perspective on remediation in contemporary medical education. In doing so, the authors acknowledge the complex interactions between institutional, professional, and societal forces that are both facilitators of and barriers to effective remediation practices. The authors propose a model that situates remediation within the contexts of society as a whole, the medical profession, and medical education institutions. They also outline a number of recommendations to constructively align remediation principles and practices, support a continuum of remediation practices, destigmatize remediation, and develop institutional communities of practice in remediation. Medical educators must embrace a responsible and accountable systems-level approach to remediation if they are to meet their obligations to provide a safe and effective physician workforce.

  1. The deep, hot biosphere: Twenty-five years of retrospection.

    Science.gov (United States)

    Colman, Daniel R; Poudel, Saroj; Stamps, Blake W; Boyd, Eric S; Spear, John R

    2017-07-03

    Twenty-five years ago this month, Thomas Gold published a seminal manuscript suggesting the presence of a "deep, hot biosphere" in the Earth's crust. Since this publication, a considerable amount of attention has been given to the study of deep biospheres, their role in geochemical cycles, and their potential to inform on the origin of life and its potential outside of Earth. Overwhelming evidence now supports the presence of a deep biosphere ubiquitously distributed on Earth in both terrestrial and marine settings. Furthermore, it has become apparent that much of this life is dependent on lithogenically sourced high-energy compounds to sustain productivity. A vast diversity of uncultivated microorganisms has been detected in subsurface environments, and we show that H 2 , CH 4 , and CO feature prominently in many of their predicted metabolisms. Despite 25 years of intense study, key questions remain on life in the deep subsurface, including whether it is endemic and the extent of its involvement in the anaerobic formation and degradation of hydrocarbons. Emergent data from cultivation and next-generation sequencing approaches continue to provide promising new hints to answer these questions. As Gold suggested, and as has become increasingly evident, to better understand the subsurface is critical to further understanding the Earth, life, the evolution of life, and the potential for life elsewhere. To this end, we suggest the need to develop a robust network of interdisciplinary scientists and accessible field sites for long-term monitoring of the Earth's subsurface in the form of a deep subsurface microbiome initiative.

  2. Twenty Years of Research on RNS for DSP: Lessons Learned and Future Perspectives

    DEFF Research Database (Denmark)

    Albicocco, Pietro; Cardarilli, Gian Carlo; Nannarelli, Alberto

    2014-01-01

    In this paper, we discuss a number of issues emerged from our twenty-year long experience in applying the Residue Number System (RNS) to DSP systems. In early days, RNS was mainly used to reach the maximum performance in speed. Today, RNS is also used to obtain powerefficient (tradeoffs speed......-power) and reliable systems (redundant RNS). Advances in microelectronics and CAD tools play an important role in favoring one technology over another, and a winning choice of the past may become at disadvantage today. In this paper, we address a number of factors influencing the choice of RNS as the winning solution...

  3. Twenty years' application of agricultural countermeasures following the Chernobyl accident: lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Fesenko, S V [International Atomic Energy Agency, 1400 Vienna (Austria); Alexakhin, R M [Russian Institute of Agricultural Radiology and Agroecology, 249020 Obninsk (Russian Federation); Balonov, M I [International Atomic Energy Agency, 1400 Vienna (Austria); Bogdevich, I M [Research Institute for Soil Science and Agrochemistry, Minsk (Belarus); Howard, B J [Centre for Ecology and Hydrology, Lancaster Environment Centre, Library Avenue, Bailrigg, Lancaster LAI 4AP (United Kingdom); Kashparov, V A [Ukrainian Institute of Agricultural Radiology (UIAR), Mashinostroiteley Street 7, Chabany, Kiev Region 08162 (Ukraine); Sanzharova, N I [Russian Institute of Agricultural Radiology and Agroecology, 249020 Obninsk (Russian Federation); Panov, A V [Russian Institute of Agricultural Radiology and Agroecology, 249020 Obninsk (Russian Federation); Voigt, G [International Atomic Energy Agency, 1400 Vienna (Austria); Zhuchenka, Yu M [Research Institute of Radiology, 246000 Gomel (Belarus)

    2006-12-15

    The accident at the Chernobyl NPP (nuclear power plant) was the most serious ever to have occurred in the history of nuclear energy. The consumption of contaminated foodstuffs in affected areas was a significant source of irradiation for the population. A wide range of different countermeasures have been used to reduce exposure of people and to mitigate the consequences of the Chernobyl accident for agriculture in affected regions in Belarus, Russia and Ukraine. This paper for the first time summarises key data on countermeasure application over twenty years for all three countries and describes key lessons learnt from this experience. (review)

  4. Site remediation techniques in India: a review

    International Nuclear Information System (INIS)

    Anomitra Banerjee; Miller Jothi

    2013-01-01

    India is one of the developing countries operating site remediation techniques for the entire nuclear fuel cycle waste for the last three decades. In this paper we intend to provide an overview of remediation methods currently utilized at various hazardous waste sites in India, their advantages and disadvantages. Over the years the site remediation techniques have been well characterized and different processes for treatment, conditioning and disposal are being practiced. Remediation Methods categorized as biological, chemical or physical are summarized for contaminated soils and environmental waters. This paper covers the site remediation techniques implemented for treatment and conditioning of wastelands arising from the operation of nuclear power plant, research reactors and fuel reprocessing units. (authors)

  5. Sustainability: A new imperative in contaminated land remediation

    International Nuclear Information System (INIS)

    Hou, Deyi; Al-Tabbaa, Abir

    2014-01-01

    Highlights: • Reviewed the emerging green and sustainable remediation movement in the US and Europe. • Identified three sources of pressures for emphasizing sustainability in the remediation field. • Presented a holistic view of sustainability considerations in remediation. • Developed an integrated framework for sustainability assessment and decision making. - Abstract: Land is not only a critical component of the earth's life support system, but also a precious resource and an important factor of production in economic systems. However, historical industrial operations have resulted in large areas of contaminated land that are only slowly being remediated. In recent years, sustainability has drawn increasing attention in the environmental remediation field. In Europe, there has been a movement towards sustainable land management; and in the US, there is an urge for green remediation. Based on a questionnaire survey and a review of existing theories and empirical evidence, this paper suggests the expanding emphasis on sustainable remediation is driven by three general factors: (1) increased recognition of secondary environmental impacts (e.g., life-cycle greenhouse gas emissions, air pollution, energy consumption, and waste production) from remediation operations, (2) stakeholders’ demand for economically sustainable brownfield remediation and “green” practices, and (3) institutional pressures (e.g., social norm and public policy) that promote sustainable practices (e.g., renewable energy, green building, and waste recycling). This paper further argues that the rise of the “sustainable remediation” concept represents a critical intervention point from where the remediation field will be reshaped and new norms and standards will be established for practitioners to follow in future years. This paper presents a holistic view of sustainability considerations in remediation, and an integrated framework for sustainability assessment and decision making

  6. Remediation plans in family medicine residency

    Science.gov (United States)

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  7. Effect of Remediation Parameters on in-Air Ambient Dose Equivalent Rates When Remediating Open Sites with Radiocesium-contaminated Soil.

    Science.gov (United States)

    Malins, Alex; Kurikami, Hiroshi; Kitamura, Akihiro; Machida, Masahiko

    2016-10-01

    Calculations are reported for ambient dose equivalent rates [H˙*(10)] at 1 m height above the ground surface before and after remediating radiocesium-contaminated soil at wide and open sites. The results establish how the change in H˙*(10) upon remediation depends on the initial depth distribution of radiocesium within the ground, on the size of the remediated area, and on the mass per unit area of remediated soil. The remediation strategies considered were topsoil removal (with and without recovering with a clean soil layer), interchanging a topsoil layer with a subsoil layer, and in situ mixing of the topsoil. The results show the ratio of the radiocesium components of H˙*(10) post-remediation relative to their initial values (residual dose factors). It is possible to use the residual dose factors to gauge absolute changes in H˙*(10) upon remediation. The dependency of the residual dose factors on the number of years elapsed after fallout deposition is analyzed when remediation parameters remain fixed and radiocesium undergoes typical downward migration within the soil column.

  8. Remedial Action Program annual conference: Proceedings

    International Nuclear Information System (INIS)

    1990-01-01

    Within the DOE's Office of Environmental Restoration ampersand Waste Management, the Office of Environmental Restoration manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. The programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings Remedial Action Program, and the West Valley Demonstration Project. These programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive or hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Uranium Mill Tailings Remedial Action Project, DOE-AL, and was held in Albuquerque, NM. This volume of proceedings is the record of that conference. The proceedings consist of abstracts, summaries, or actual text for each presentation made and any visual aids used by the speakers

  9. Twenty-Five Year Site Plan FY2013 - FY2037

    Energy Technology Data Exchange (ETDEWEB)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual

  10. Twenty years of experience with central softening in The Netherlands : Water quality – Environmental benefits – Costs

    NARCIS (Netherlands)

    Hofman, J.A.M.H.; Kramer, O.J.I.; van der Hoek, J.P.; Nederlof, M; Groenendijk, M

    2006-01-01

    Central softening has been utilized by the Dutch water utilities since the late 1970s. It was introduced in the water treatment process as a method to supply water with an optimum water composition to prevent lead and copper release and to prevent excessive scaling. Twenty years of experience show

  11. Elevated dioxin levels in chloracne cases twenty years after the Seveso, Italy accident

    Energy Technology Data Exchange (ETDEWEB)

    Baccarelli, A.; Pesatori, A.C.; Consonni, D.; Bonzini, M.; Giacomini, S.M.; Bertazzi, P.A. [EPOCA Research Center, Univ. of Milan (Italy); Mocarelli, P. [Dept. of Lab. Medicine, Univ. of Milan-Bicocca, Desio (Italy); Patterson, D.G. Jr. [Centers for Disease Control and Prevention, Atlanta, GA (United States); Caporaso, N.E.; Landi, M.T. [Div. of Cancer Epidemiology and Genetics, National Cancer Inst., NIH, DHHS, Bethesda, MD (United States)

    2004-09-15

    In July 1976, an industrial accident contaminated a residential area surrounding Seveso, Italy, with high levels of 2,3,7,8-Tetrachlorodibenzo-p-dioxin (TCDD). The exposure was acute, relatively pure, and affected more than 45,000 men, women, and children. By February 1978, 193 chloracne cases, mostly children, had been identified in the exposed population. Twenty years after, we conducted a case-control study on subjects diagnosed with chloracne and control subjects, who had not developed chloracne after the accident, to evaluate their TCDD plasma levels, as well as the exposure-response relationship and possible determinants of susceptibility to TCDD effects in this population.

  12. Chernobyl 30 years on. Key remediation and safety projects are 'on track'

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, David [NucNet, Brussels (Belgium)

    2016-06-15

    Thirty years after the accident at Chernobyl, key remediation and safety projects are on track and construction of the vital Euro 1.5 bn (US Dollars 1.6 bn) New Safe Confinement (NSC) is almost finished with commissioning scheduled for November 2017, the company in charge of construction and the European Bank for Reconstruction and Development (EBRD) told NucNet. The NSC is the most high profile and expensive element of the US Dollars 2.15 bn Shelter Implementation Plan (SIP), a framework developed to overcome the consequences of the accident.

  13. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  14. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  15. Natural remediation of an unremediated soil twelve years after a mine accident: trace element mobility and plant composition.

    Science.gov (United States)

    Burgos, Pilar; Madejón, Paula; Madejón, Engracia; Girón, Ignacio; Cabrera, Francisco; Murillo, José Manuel

    2013-01-15

    The long-term influence of a mine spill in soil was studied 12 years after the Aznalcóllar accident. Soils where the pyritic sludge was not removed, a fenced plot established for research purposes (2000 m(2)) and soils where the process of remediation was accomplished successfully were sampled and studied in detail. Soils were characterized at different depths, down to 100 cm depth, determining chemical parameters and total concentrations of major and trace elements. Moreover plants colonizing remediated (RE) and non remediated (NRE) soils were also analysed attending their potential risk for herbivores. Strong acidification was observed in the NRE soil except in surface (0-10 cm). The progressive colonization of natural vegetation, more than 90% of the fenced plot covered by plants, could facilitate this increased pH values in the top soil (pH 6). In the NRE soil, the successive oxidation and hydrolysis of sulphide in the deposited sludge on the surface after the accident resulted in a re-dissolution of the most mobile element (Cd, Cu and Zn) and a penetration to deeper layers. Trace element concentrations in plants growing in the NRE soil showed normal contents for higher plants and tolerable for livestock. Nitrogen and mineral nutrients were of the same order in both soils, and also normal for high plants and adequate for animal nutrition. Despite of the natural remediation of the NRE soil, results demonstrate that the remediation tasks carried out in all the area, the Guadiamar Green Corridor at present, were necessary to avoid the leaching of the most mobile elements and minimize the risk of contamination of groundwater sources, many of them close to the Doñana National Park. Copyright © 2012 Elsevier Ltd. All rights reserved.

  16. Permanence and diffusion of borax-copper hydroxide remedial preservative applied to unseasoned pine posts : 10 year update

    Science.gov (United States)

    Douglas Crawford; Stan Lebow; Mike West; Bill Abbott

    2005-01-01

    In 1993, unseasoned pine posts were treated with groundline remedial treatment containing 3.1% copper hydroxide and 40% sodium tetraborate decahydrate (borax). The soundness of the posts was periodically evaluated using a push test. After 3.5, 6.5, and 10 years, sections were taken from two posts to determine retention of borax and copper hydroxide below ground to 36...

  17. Remediation of spatial processing disorder (SPD).

    Science.gov (United States)

    Graydon, Kelley; Van Dun, Bram; Tomlin, Dani; Dowell, Richard; Rance, Gary

    2018-05-01

    To determine the efficacy of deficit-specific remediation for spatial processing disorder, quantify effects of remediation on functional listening, and determine if remediation is maintained. Participants had SPD, diagnosed using the Listening in Spatialised Noise-Sentences test. The LiSN and Learn software was provided as auditory training. Post-training, repeat LiSN-S testing was conducted. Questionnaires pre- and post-training acted as subjective measures of remediation. A late-outcome assessment established long-term effects of remediation. Sixteen children aged between 6;3 [years; months] and 10;0 completed between 20 and 146 training games. Post-training LiSN-S improved in measures containing spatial cues (p ≤ 0.001) by 2.0 SDs (3.6 dB) for DV90, 1.8 SDs for SV90 (3.2 dB), 1.4 SDs for spatial advantage (2.9 dB) and 1.6 SDs for total advantage (3.3 dB). Improvement was also found in the DV0 condition (1.4 dB or 0.5 SDs). Post-training changes were not significant in the talker advantage measure (1.0 dB or 0.4 SDs) or the SV0 condition (0.3 dB or 0.1 SDs). The late-outcome assessment demonstrated improvement was maintained. Subjective improvement post-remediation was observed using the parent questionnaire. Children with SPD had improved ability to utilise spatial cues following deficit-specific remediation, with the parent questionnaire sensitive to remediation. Effects of the remediation also appear to be sustained.

  18. Mercury pollution control in industrial area in Rosignano Marittimo (Italy) during last twenty years (1971-1991)

    International Nuclear Information System (INIS)

    Bertani, R.

    1995-01-01

    Author takes into account some papers dealing with mercury environmental pollution, appeared in different scientific journals over the last twenty years, in the aim of defining a homogeneous frame for the comprehension of the environmental situation development. Data relating to air, marine water, sediments, animal and vegetal organisms, show a consistent decreasing of mercury emissions with the passing of time. Nevertheless, author fearfully points out the environmental fate of the mercury which has been heavily released from the plant in the past years and to whom he wishes to turn attention for the assessment of an adequate control procedure

  19. Normal Health-Related Quality of Life and Ability to Work Twenty-nine Years After in Situ Arthrodesis for High-Grade Isthmic Spondylolisthesis.

    Science.gov (United States)

    Joelson, Anders; Hedlund, Rune; Frennered, Karin

    2014-06-18

    The purpose of this mixed prospective and retrospective case series was to evaluate the long-term health-related quality of life and physical disability after in situ arthrodesis for high-grade isthmic spondylolisthesis. Thirty-five of forty consecutive patients who had in situ spinal arthrodesis for high-grade isthmic spondylolisthesis at a mean age of fifteen years (range, nine to twenty-five years) completed validated questionnaires (Short Form-36 [SF-36], EuroQol-5 Dimensions [EQ-5D], Zung depression scale, Oswestry disability index [ODI], Million score, and back and leg pain visual analog scale [VAS]) and underwent physical examination twenty-nine years (range, twenty-three to thirty-five years) after surgery. The mean age at the time of follow-up was forty-three years (range, thirty-seven to fifty-one years). In the absence of a formal control group, the scores on the SF-36 and EQ-5D were compared with Swedish normative data. The proportion of patients at work was compared with an age-matched control group derived from official statistics of Sweden. The Million score at the long-term follow-up was compared with the corresponding results at the mid-term follow-up of the same patients at a mean age of twenty-two years. The scores on the SF-36 and EQ-5D were similar to the scores of the general Swedish population. The mean Zung depression scale score was 30 (range, 20 to 52), the mean ODI score was 10 (range, 0 to 34), the mean back pain VAS score was 13 (range, 0 to 72), and the mean leg pain VAS score was 9 (range, 0 to 60). The Million score averaged 28 (range, 0 to 109) and was slightly worsened compared with the score of 19 (range, 0 to 94) at the mid-term follow-up (p = 0.034). The proportion of patients at work was the same as that for the age-matched general Swedish population. Our study shows good outcomes in health-related quality of life, disability, pain, and ability to work at up to twenty-nine years after in situ lumbar spine arthrodesis for high

  20. CENTRAL PLATEAU REMEDIATION

    International Nuclear Information System (INIS)

    ROMINE, L.D.

    2006-01-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress

  1. Final remediation of the provisional storage near Zavratec

    International Nuclear Information System (INIS)

    Zeleznik, N.; Mele, I.

    2000-01-01

    In the Western part of Slovenia near the village of Zavratec radioactive waste from the decontamination of the Oncological Institute has been stored in an old abandoned military barracks for many decades. The ARAO Agency had been assigned to remediate this provisional storage. In 1996 the first phase of the remediation was concluded, in which the measurements, inventorying and repacking of radioactive waste were carried out. At the end of this phase the waste was restored. After three years of suspension, the remedial work continued in autumn 1999 with the separation of radioactive from non-radioactive waste and transportation of all radioactive waste to the Slovenian central storage for small producers near Ljubljana. At the beginning of the year 2000 the old storage near Zavratec was completely decontaminated to be released for unrestricted use. The preparation for and the implementation of remedial actions are presented in the paper. (author)

  2. Remedial action of radium contaminated residential properties

    International Nuclear Information System (INIS)

    White, D.; Eng, J.

    1986-01-01

    Since November 1983, the New Jersey Department of Environmental Protection (NJDEP) and the US Environmental Protection Agency (USEPA) have been in the process of identifying properties in Montclair, Glen Ridge and West Orange, New Jersey, which were built over radium contaminated soil landfilled areas. Elevated indoor radon concentrations prompted the Centers for Disease Control (CDC) to issue a health advisory which included permanent remediation of radon progeny levels in excess of 0.02 Working Levels within two years of discovery. In order to expedite remedial action, NJDEP undertook a ten million dollar cleanup program. Remedial Action at the 12 residential properties encountered some unanticipated problems despite the efforts of numerous government agencies and their contractors to characterize the contamination as much as possible prior to remediation. Some of the unanticipated issues include contamination from other radionuclides, underestimation of removal volumes, and controversy over the transportation and disposal of the radium contaminated soil at a commercial facility in Nevada. This paper will review the approach taken by NJDEP to the remedial action for radium contaminated soil, discuss some of the issues encountered during the remedial action, and provide post remedial action data

  3. Building On Builder: The Persistent Icarus Syndrome at Twenty Years

    Science.gov (United States)

    2013-06-01

    mission of the United States Air Force is to "fly, fight, and win…in air, space and cyberspace"--as an intergral member of the Joint team that...Scenarios: A Military Futurist Explores War in the Twenty-First Century (New York: Bantam Books Trade Paperbacksl, 2009), 17. 33 Carl H. Builder

  4. CND twenty years on

    International Nuclear Information System (INIS)

    Taylor, R.; Pritchard, C.

    1980-01-01

    A study is presented of people who were supporters or leaders in the Campaign for Nuclear Disarmament (CND) in the 1950s and 1960s. Information is given from questionnaires completed by 403 respondents, about their social and political development during the past 20 years. (author)

  5. New IAEA guidelines on environmental remediation

    Energy Technology Data Exchange (ETDEWEB)

    Fesenko, Sergey [International Atomic Energy Agency, A2444, Seibersdorf (Austria); Howard, Brenda [Centre for Ecology and Hydrology, Lancaster Environment Centre, LA1 4AP, Lancaster (United Kingdom); Kashparov, Valery [Ukrainian Institute of Agricultural Radiology, 08162, 7, Mashinobudivnykiv str., Chabany, Kyivo-Svyatoshin region, Kyiv (Ukraine); Sanzharova, Natalie [Russian Institute of Agricultural Radiology and Agroecology, Russian Federation, 249032, Obninsk (Russian Federation); Vidal, Miquel [Analytical Chemistry Department-Universitat de Barcelona, Barcelona, 08028 Barcelona (Spain)

    2014-07-01

    In response to the needs of its Member States, the International Atomic Energy Agency (IAEA) has published many documents covering different aspects of remediation of contaminated environments. These documents range from safety fundamentals and safety requirements to technical documents describing remedial technologies. Almost all the documents on environmental remediation are related to uranium mining areas and decommissioning of nuclear facilities. IAEA radiation safety standards on remediation of contaminated environments are largely based on these two types of remediation. The exception is a document related to accidents, namely the IAEA TRS No. 363 'Guidelines for Agricultural Countermeasures Following an Accidental Release of Radionuclides'. Since the publication of TRS 363, there has been a considerable increase in relevant information. In response, the IAEA initiated the development of a new document, which incorporated new knowledge obtained during last 20 years, lessons learned and subsequent changes in the regulatory framework. The new document covers all aspects related to the environmental remediation from site characterisation to a description of individual remedial actions and decision making frameworks, covering urban, agricultural, forest and freshwater environments. Decisions taken to commence remediation need to be based on an accurate assessment of the amount and extent of contamination in relevant environmental compartments and how they vary with time. Major aspects of site characterisation intended for remediation are described together with recommendations on effective sampling programmes and data compilation for decision making. Approaches for evaluation of remedial actions are given in the document alongside the factors and processes which affect their implementation for different environments. Lessons learned following severe radiation accidents indicate that remediation should be considered with respect to many different

  6. Twenty years of renewable energy law; 20 Jahre Recht der Erneuerbaren Energien

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Thorsten (ed.)

    2012-07-01

    The present volume was compiled as part of a project funded by the German Federal Ministry for Environment, Nature Conservation and Reactor Safety, one event under which was the seventh Wuerzburg conference on environmental energy law with the title ''Twenty Years of Renewable Energy Law'' which took place on 13/14 October 2010. It comprises 36 contributions which, from different scientific perspectives, take stock of the significance of renewable energies for climate protection and the energy supply, examine the developments of the past 20 years and draw conclusions for the future use of renewable energy. The authors are scientists from the areas of climate research, economics, political science, engineering, environmental psychology and jurisprudence who have dedicated their work to issues that directly or indirectly relate to the expansion of renewable energies. Together they have created an overall picture of renewable energies with its many different aspects and related topics, a picture that necessarily cannot be complete but which nevertheless provides many rich insights. The great majority of articles were written around the turn of the year to 2011, just after the granting of lifetime extension for German nuclear power plants. They thus only take sparse account of the diverse and for some part far-reaching changes in German energy policy that came about after the reactor disaster in Fukushima.

  7. A new methodology for cost-effectiveness studies of domestic radon remediation programmes: Quality-adjusted life-years gained within Primary Care Trusts in Central England

    International Nuclear Information System (INIS)

    Coskeran, Thomas; Denman, Antony; Phillips, Paul; Gillmore, Gavin; Tornberg, Roger

    2006-01-01

    Radon is a naturally occurring radioactive gas, high levels of which are associated with geological formations such as those found in Northamptonshire and North Oxfordshire in the UK. The UK's National Radiological Protection Board have designated both districts as radon Affected Areas. Radiation levels due to radon, therefore, exceed 200 Bq m -3 , the UK's domestic Action Level, in over one percent of domestic properties. Because of radon's radioactivity, exposure to the gas can potentially cause lung cancer, and has been linked to some 2000 deaths a year in the UK. Consequently, when radiation levels exceed the Action Level, remediation against radon's effects is recommended to householders. This study examines the cost-effectiveness of remediation measures in Northamptonshire and North Oxfordshire by estimating cost per quality-adjusted life-year gained in four Primary Care Trusts, organisations that play a key public health policy role in the UK's National Health Service. The study is the first to apply this approach to estimating the cost-effectiveness of radon remediation programmes. Central estimates of cost per quality-adjusted life-year in the four Primary Care Trusts range from Pounds 6143 to Pounds 10 323. These values, when assessed against generally accepted criteria, suggest the remediation programmes in the trusts were cost-effective. Policy suggestions based on the estimates, and designed to improve cost-effectiveness further, are proposed for the four Primary Care Trusts and the UK's National Health Service

  8. Serum concentrations and profiles of polychlorinated biphenyls in Taiwan Yu-cheng victims twenty years after the incident

    Energy Technology Data Exchange (ETDEWEB)

    Lung, S.-C. Candice [Research Center for Environmental Changes, Academia Sinica, Nankang, Taipei, Taiwan 115 (China); Guo, Y.-L.L. [Department of Environmental and Occupational Health, College of Medicine, National Cheng Kung University, 138 Sheng-Li Rd., Tainan, Taiwan 70428 (China); Chang, H.-Y.[Department of Environmental and Occupational Health, College of Medicine, National Cheng Kung University, 138 Sheng-Li Rd., Tainan, Taiwan 70428 (China)]. E-mail: h7154@mail.ncku.edu.tw

    2005-07-15

    In 1979, about 2000 people in central Taiwan were intoxicated via rice oil consumption that was contaminated with polychlorinated biphenyls (PCBs). This 'Yu-cheng' incident was one of the two known major human PCB intoxication episodes. Twenty years after the intoxication, serum samples of 435 Yu-cheng victims, 414 adults and 21 children, were collected. Sixteen PCB congeners were analyzed with a gas chromatograph-electron capture detector. We found the median concentration of total PCBs in the adult serum was 1500 ng/g lipid, still substantially higher than that of the general population in Taiwan (3.7-fold) and most seafood consumers in the world. Most of analyzed PCB congeners in children were below or around the detection limits. Congener no. 138, however, had the highest concentrations, approximately accounting for 55% and 29% in the child and adult groups, respectively. Given that PCBs are persistent organic pollutants and endocrine disruptors, the concentrations and congener-specific profiles regarding the Yu-cheng victims provide valuable information for the investigation of such chemicals in humans. - Total serum PCBs in the Yu-cheng adult victims twenty years after the incident were still higher than that of the general population in Taiwan.

  9. Evaluating a 5-year metal contamination remediation and the biomonitoring potential of a freshwater gastropod along the Xiangjiang River, China.

    Science.gov (United States)

    Li, Deliang; Pi, Jie; Zhang, Ting; Tan, Xiang; Fraser, Dylan J

    2018-05-16

    Effective remediation of heavy metal pollution in aquatic systems is desired in many regions, but it requires integrative assessments of sediments, water, and biota that can serve as robust biomonitors. We assessed the effects of a 5-year metal contamination remediation along the Xiangjiang River, China, by comparing concentrations of trace metals in water and surface sediments between 2010-2011 and 2016. We also explored the trace metal biomonitoring potential of a freshwater gastropod (Bellamya aeruginosa). Metal concentrations in water (means and ranges) dropped over time to within permissible limits of drinking water guidelines set by China, USEPA, and WHO in 2016. Although sediment means and ranges of Cd, Pb, Zn, and Mn also diminished with remediation, those for Cr and Cu slightly increased, and all six metals retained concentrations higher than standards set by China. All metals in sediments could also be associated with anthropogenic inputs using a hierarchical clustering analysis, and they generate high potential ecological risks based on several indices, especially for Cd and As. The bio-sediment accumulation factors of all measured trace metals in gastropod soft tissues and shells were lower than 1.0, except for Ca. Trace metal contents in gastropods were positively correlated with those in water and surface sediments for As (soft tissues) and Cr (shells). Collectively, our results do not yet highlight strong beneficial effects of 5-year remediation and clearly illustrate the heavy metal pollution remaining in Xiangjiang River sediment. Additional physical, chemical, and biological measurements should be implemented to improve sediment quality. We further conclude that gastropod soft tissues and shells can be suitable biomonitors of spatial differences in some heavy metals found within river sediments (e.g., As, Cr).

  10. What is the Prevalence and Success of Remediation of Emergency Medicine Residents?

    OpenAIRE

    Silverberg, Mark; Weizberg, Moshe; Murano, Tiffany; Smith, Jessica L.; Burkhardt, John C.; Santen, Sally A.

    2015-01-01

    Introduction: The primary objective of this study was to determine the prevalence of remediation, competency domains for remediation, the length, and success rates of remediation in emergency medicine (EM). Methods: We developed the survey in SurveymonkeyTM with attention to content and response process validity. EM program directors responded how many residents had been placed on remediation in the last three years. Details regarding the remediation were collected inclu...

  11. Remedial Action Programs annual meeting: Proceedings

    International Nuclear Information System (INIS)

    1988-01-01

    Within the DOE's Office of Nuclear Energy, the Office of Remedial Action and Waste Technology manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. These programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings remedial Action Program and the West Valley Demonstration Project. The programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Surplus Facilities Management Program and was held near DOE Headquarters, in Gaithersburg, Maryland. This volume of proceedings provides the record for the meeting. The proceedings consist of abstracts for each presentation made at the meeting, and the visual aids (if any) used by the speakers. The material is organized in the following pages according to the five different sessions at the meeting: Session 1: Environmental Compliance--Policy; Session 2: Environmental Compliance--Practice; Session 3: Reports from working groups; Session 4: DandD Technology; and Session 5: Remedial Action Technology. The agenda for the meeting and the list of meeting registrants are provided in Appendix A and B, respectively. Individual papers are processed separately for the data base

  12. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    International Nuclear Information System (INIS)

    1997-01-01

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project

  13. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1996-01-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project

  14. One hundred and twenty-five years of the Annals of Botany. Part 2: the years 1937 to 2012

    Science.gov (United States)

    Jackson, Michael B.

    2016-01-01

    Background Annals of Botany is a peer-reviewed plant biology journal. It was started in 1887, making it the oldest continuously published plant science title. A previous article [Jackson MB. 2015. One hundred and twenty-five years of the Annals of Botany. Part 1: the first 50 years (1887–1936). Annals of Botany 115: 1–18] summarized events leading to its founding, highlighted the individuals involved and examined the Journal’s achievements and management practices over the first 50 years to 1937. This second article covers the next 75 years. Sources of information The account draws principally on the Journal’s own records, minute books, financial accounts, original letters and notes held by the Annals of Botany Company, the Journal’s owners and managers. Content In 1937, its 51st year, the Journal was re-launched as Annals of Botany New Series and its volume numbers were reset to No. I. The present article evaluates the evolution of the New Series up to 2012, Annals of Botany’s 125th anniversary year. The period includes a 2-year run-up to World War II, six war years and their immediate aftermath, and then on through increasingly competitive times. The ebb and flow of the Journal’s fortunes are set against a roll-call of the often highly distinguished scientists who managed and edited the Journal. The article also examines an internal crisis in the 1980s that radically altered the Journal’s organization in ways that were, ultimately, to its benefit. The narrative is set against changes to economic conditions in Great Britain over the period, to the evolving nature and geographical distribution of much experimental plant science and to the digital revolution that, from the late 20th century, transformed the workings of Annals of Botany and of scientific publishing more generally. PMID:27974325

  15. Twenty Years After the 1988 Yellowstone Fires: Lessons About Disturbance and Ecosystems

    Science.gov (United States)

    Romme, W.H.; Boyce, M.S.; Gresswell, R.; Merrill, E.H.; Minshall, G.W.; Whitlock, C.; Turner, M.G.

    2011-01-01

    The 1988 Yellowstone fires were among the first in what has proven to be an upsurge in large severe fires in the western USA during the past 20 years. At the time of the fires, little was known about the impacts of such a large severe disturbance because scientists had had few previous opportunities to study such an event. Ecologists predicted short- and long-term effects of the 1988 fires on vegetation, biogeochemistry, primary productivity, wildlife, and aquatic ecosystems based on scientific understanding of the time. Twenty-plus years of subsequent study allow these early predictions to be evaluated. Most of the original predictions were at least partially supported, but some predictions were refuted, others nuanced, and a few postfire phenomena were entirely unexpected. Post-1988 Yellowstone studies catalyzed advances in ecology focused on the importance of spatial and temporal heterogeneity, contingent influences, and multiple interacting drivers. Post-1988 research in Yellowstone also has changed public perceptions of fire as an ecological process and attitudes towards fire management. Looking ahead to projected climate change and more frequent large fires, the well-documented ecological responses to the 1988 Yellowstone fires provide a foundation for detecting and evaluating potential changes in fire regimes of temperate mountainous regions. ?? 2011 Springer Science+Business Media, LLC.

  16. Program management strategies for following EPA guidance for remedial design/remedial action at DOE sites

    International Nuclear Information System (INIS)

    Hopper, J.P.; Chew, J.R.; Kowalski, T.E.

    1991-01-01

    At the US Department of Energy (DOE) facilities, environmental restoration is being conducted in accordance with Federal Facilities Compliance Agreements (or Interagency Agreements). These agreements establish a cooperative working relationship and often define roles, responsibilities and authorities for conduct and oversight of the Remedial Action Programs. The US Environmental Protection Agency (EPA) has guidelines on how to initiate and perform remedial actions for sites they are remediating under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Re-Authorization Act (SARA). This paper addresses some of the difference and commonalities between the DOE project management procedures and EPA guidance documents. This report covers only the RD/RA phase of environmental restoration. On the surface, there are many apparent differences between the DOE and EPA project management processes. Upon closer review, however, many of the differences are the result of applying different terminology to the same phase of a project. By looking for the similarities in the two processes rather than hunting for differences, many communication problems are avoided. Understanding both processes also aids in figuring out when, how and to what extent EPA should participate in the RD/RA phase for DOE lead cleanup activities. The DOE Remedial Design and Remedial Action process is discussed in a stepwise manner and compared to the EPA process. Each element of the process is defined. Activities common to both the EPA and DOE are correlated. The annual DOE budget cycle for remediation projects and the four-year cycle for appropriation of remediation funds are discussed, and the constraints of this process examined. DOE orders as well as other requirements for RD/RA activities are summarized and correlated to EPA regulations where this is possible

  17. Twenty-five years of the common market in coal, 1953--1978. [genesis and growth

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    Twenty-five years have passed since the European Coal and Steel commmunity was established. An attempt is made to show what economic integration is, what problems have arisen, and how the community has tried to overcome them. Three phases can be distinguished during the period under review--a first phase of growth in the coal industry between 1953 and 1957; a second phase marked by a plentiful supply of cheap hydrocarbons and a rapid reduction in coal output despite exceptional growth, linked with a parallel increase in overall energy requirements; and a third phase from 1973, marked by sharp price increases by the oil producing countries with repercussions on the world market in coal.

  18. Reactions to combat stress in Israeli veterans twenty years after the 1982 Lebanon war.

    Science.gov (United States)

    Solomon, Zahava; Shklar, Rami; Singer, Yaffa; Mikulincer, Mario

    2006-12-01

    During the war or shortly thereafter, the most common manifestation of combat induced psychopathology is combat stress reaction (CSR). The long-term consequences of CSR have so far received little scientific attention. The aim of this study was to examine whether CSR is a marker for long-term PTSD and other psychiatric comorbidities. Two groups of veterans from the 1982 Lebanon war were assessed 20 years after the war: one comprised 286 CSR casualties and the other comprised 218 matched non-CSR soldiers. Participants were assessed for PTSD, psychiatric symptomatology, social functioning, physical health, and postwar life events. Twenty years after the war, veterans with antecedent CSR reported more PTSD, psychiatric symptomatology and distress, social dysfunction, and health problems than did non-CSR veterans. We conclude that CSR should be seen as a marker for long-term psychiatric distress and impairment. In addition, the implications of combat-related trauma are broad and varied, and go beyond the narrow scope of PTSD.

  19. Twenty-five years of transient counting experience in French PWR units

    Energy Technology Data Exchange (ETDEWEB)

    Barthelet, B. [Electricite de France (EDF DPN), 93 - Saint-Denis (France); Savoldelli, D.; Fritz, R. [Electricite de France (EDF DPN), 93 - Noisy le Grand (France)

    2001-07-01

    For nearly twenty five years, EDF has been checking that the actual operating transients are neither more severe nor more numerous than the design basis transients. This activity of transient cycle counting and bookkeeping has enabled EDF to own a database of more than 800 reactor.years for the PWR units. The current method of transient cycle counting is presented. In the paper, we will point out the main results of transient cycle counting and lessons learned. In general, the frequencies of transients are lower than the design frequencies. In few cases, they are higher, such as the transient frequencies of the RCS lines connected to auxiliary systems often due to operating procedures or particular periodic testing. Few periodic tests were not taken into account in the design basis transient file ; they have been detected thanks to the transient cycle counting. In the last 1980's, we achieved the first updating of the design basis transient file for the PWR 900 MWe series. In the early 1990's, we updated the design basis transient file of the PWR 1300 MWe series. In fact, since design and start-up, the operating conditions have been modified (fuel cycle with stretch-out, modification of the hot leg and cold leg temperatures for the PWR 1300 MWe,...). This was the cause of many unclassified transients. In the new design basis transient file, we have created new transients and increased the frequencies of some of them. This has enabled to consider the updated design basis transient file more representative of actual operating transients. For some years, we have increasingly associated the operators with the transient cycle counting concern. We noticed progress (decreased frequencies of most transients). (authors)

  20. Twenty-five years of transient counting experience in French PWR units

    International Nuclear Information System (INIS)

    Barthelet, B.; Savoldelli, D.; Fritz, R.

    2001-01-01

    For nearly twenty five years, EDF has been checking that the actual operating transients are neither more severe nor more numerous than the design basis transients. This activity of transient cycle counting and bookkeeping has enabled EDF to own a database of more than 800 reactor.years for the PWR units. The current method of transient cycle counting is presented. In the paper, we will point out the main results of transient cycle counting and lessons learned. In general, the frequencies of transients are lower than the design frequencies. In few cases, they are higher, such as the transient frequencies of the RCS lines connected to auxiliary systems often due to operating procedures or particular periodic testing. Few periodic tests were not taken into account in the design basis transient file ; they have been detected thanks to the transient cycle counting. In the last 1980's, we achieved the first updating of the design basis transient file for the PWR 900 MWe series. In the early 1990's, we updated the design basis transient file of the PWR 1300 MWe series. In fact, since design and start-up, the operating conditions have been modified (fuel cycle with stretch-out, modification of the hot leg and cold leg temperatures for the PWR 1300 MWe,...). This was the cause of many unclassified transients. In the new design basis transient file, we have created new transients and increased the frequencies of some of them. This has enabled to consider the updated design basis transient file more representative of actual operating transients. For some years, we have increasingly associated the operators with the transient cycle counting concern. We noticed progress (decreased frequencies of most transients). (authors)

  1. A remedial alternative prioritization method

    International Nuclear Information System (INIS)

    Richter, S.A.; Travis, C.C.

    1987-01-01

    This study develops and tests a technique for evaluating and prioritizing alternative remedial actions for hazardous waste sites. The method is based on criteria involving risk, benefit and cost, and identifies the most cost-effective solution to a given remedial problem. Four sites on the Department of Energy's Oak Ridge National Laboratory (ORNL) property in Oak Ridge, Tennessee, were used in a case study to develop and test the method. Results of the case study indicate that even if the cap providing in situ containment must be replaced every 10 years, it is a superior alternative to total excavation of the waste sites

  2. Bioassay responses and effects on benthos after pilot remediations in the delta of the rivers Rhine and Meuse

    International Nuclear Information System (INIS)

    Besten, Pieter J. den; Brink, Paul J. van den

    2005-01-01

    Chemical and biological monitoring was carried out for 5 years following pilot remediations at two locations in the Rhine-Meuse delta. The remediations consisted of partial excavation of the contaminated sediments, followed by applying a clean layer of sandy material on top. After the remediation, a new silty sediment top layer was formed exhibiting a lower toxicity in five sediment/sediment pore water bioassays. Compared to the unremediated sites, lower metal and PAH concentrations were found at the remediated sites, but in one location at the same time elevated HCH, PCB and HCB levels were recorded. One year after the remediation, the differences became smaller, although effects-based classification showed that the remediated site showed a higher quality up to the last year. In both remediated sites a rapid recolonization of nematodes, oligochaetes and chironomids was observed, while the recolonization by bivalves was slower. A few years after the remediation the differences decrease. - Capping contaminated sediments can be an effective remediation measure in two large river deltas

  3. Bioassay responses and effects on benthos after pilot remediations in the delta of the rivers Rhine and Meuse

    Energy Technology Data Exchange (ETDEWEB)

    Besten, Pieter J. den [Institute for Inland Water Management and Waste Water Treatment (RIZA), Ministry of Transport, Public Works and Water Management, PO Box 17, 8200 AA Lelystad (Netherlands)]. E-mail: p.dbesten@riza.rws.minvenw.nl; Brink, Paul J. van den [Alterra Green World Research, Wageningen University and Research Centre, PO Box 47, 6700 AA Wageningen (Netherlands)

    2005-07-15

    Chemical and biological monitoring was carried out for 5 years following pilot remediations at two locations in the Rhine-Meuse delta. The remediations consisted of partial excavation of the contaminated sediments, followed by applying a clean layer of sandy material on top. After the remediation, a new silty sediment top layer was formed exhibiting a lower toxicity in five sediment/sediment pore water bioassays. Compared to the unremediated sites, lower metal and PAH concentrations were found at the remediated sites, but in one location at the same time elevated HCH, PCB and HCB levels were recorded. One year after the remediation, the differences became smaller, although effects-based classification showed that the remediated site showed a higher quality up to the last year. In both remediated sites a rapid recolonization of nematodes, oligochaetes and chironomids was observed, while the recolonization by bivalves was slower. A few years after the remediation the differences decrease. - Capping contaminated sediments can be an effective remediation measure in two large river deltas.

  4. Understanding Contamination; Twenty Years of Simulating Radiological Contamination

    Energy Technology Data Exchange (ETDEWEB)

    Emily Snyder; John Drake; Ryan James

    2012-02-01

    A wide variety of simulated contamination methods have been developed by researchers to reproducibly test radiological decontamination methods. Some twenty years ago a method of non-radioactive contamination simulation was proposed at the Idaho National Laboratory (INL) that mimicked the character of radioactive cesium and zirconium contamination on stainless steel. It involved baking the contamination into the surface of the stainless steel in order to 'fix' it into a tenacious, tightly bound oxide layer. This type of contamination was particularly applicable to nuclear processing facilities (and nuclear reactors) where oxide growth and exchange of radioactive materials within the oxide layer became the predominant model for material/contaminant interaction. Additional simulation methods and their empirically derived basis (from a nuclear fuel reprocessing facility) are discussed. In the last ten years the INL, working with the Defense Advanced Research Projects Agency (DARPA) and the National Homeland Security Research Center (NHSRC), has continued to develop contamination simulation methodologies. The most notable of these newer methodologies was developed to compare the efficacy of different decontamination technologies against radiological dispersal device (RDD, 'dirty bomb') type of contamination. There are many different scenarios for how RDD contamination may be spread, but the most commonly used one at the INL involves the dispersal of an aqueous solution containing radioactive Cs-137. This method was chosen during the DARPA projects and has continued through the NHSRC series of decontamination trials and also gives a tenacious 'fixed' contamination. Much has been learned about the interaction of cesium contamination with building materials, particularly concrete, throughout these tests. The effects of porosity, cation-exchange capacity of the material and the amount of dirt and debris on the surface are very important factors

  5. Hanford sitewide grounwater remediation - supporting technical information

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1996-05-01

    The Hanford Sitewide Groundwater Remediation Strategy was issued in 1995 to establish overall goals for groundwater remediation on the Hanford Site. This strategy is being refined to provide more detailed justification for remediation of specific plumes and to provide a decision process for long-range planning of remediation activities. Supporting this work is a comprehensive modeling study to predict movement of the major site plumes over the next 200 years to help plan the remediation efforts. The information resulting from these studies will be documented in a revision to the Strategy and the Hanford Site Groundwater Protection Management Plan. To support the modeling work and other studies being performed to refine the strategy, this supporting technical information report has been produced to compile all of the relevant technical information collected to date on the Hanford Site groundwater contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, and description of the contaminant plumes. The primary information in the report relates to conceptualization of the source terms and available history of groundwater transport, description of the contaminant plumes, rate of movement based on the conceptual model and monitoring data, risk assessment, treatability study information, and current approach for plume remediation

  6. "Europe" as an Alibi: An Overview of Twenty Years of Policy, Curricula and Textbooks in the Republic of Cyprus--and Their Review

    Science.gov (United States)

    Philippou, Stavroula

    2012-01-01

    This article compares discourses on "Europe" in Greek-Cypriot policy, curricula and textbooks over approximately the last twenty years, from the early 1990s, when Cyprus applied for European Union (EU) membership, until 2011-12, the school year during which the recently revised curricula were gradually introduced to schools for…

  7. Radon remediation in irish schools

    International Nuclear Information System (INIS)

    Synnott, H.

    2006-01-01

    Full text: Commencing in 1998, the Radiological Protection Institute of Ireland carried out radon measurements in 3826 schools in the Republic of I reland on behalf of the Irish Department of Education and Science (D.E.S.). This represents approximately 97% of all schools in the country. Approximately 25% (984) schools had radon concentrations above the Irish national schools Reference Level for radon of 200 Bq/m 3 and required remedial work. The number of individual rooms with radon concentrations above 200 Bq/m 3 was 3020. Remedial work in schools commenced in early 2000. In general schools with maximum radon concentrations in the range 200 -400 Bq/m 3 in one or more rooms were remediated through the installation of passive systems such as an increase in permanent background ventilation mainly wall vents and trickle vents in windows. Schools with maximum radon concentrations greater than 400 Bq/m 3 were usually remediated through the provision of active systems mainly fan assisted sub -slab de pressurization or where this was not possible fan assisted under floor ventilation. The cost of the remedial programme was funded by central Government. Active systems were installed by specialized remedial contractors working to the specifications of a radon remedial expert appointed by the D.E.S. to design remedial systems for affected schools. Schools requiring increased ventilation were granted aided 190 pounds per affected room and had to organize the work themselves. In most schools radon remediation was successful in reducing existing radon concentrations to below the Reference Level. Average radon concentration reduction factors for sub-slab de pressurization systems and fan assisted fan assisted under floor ventilation ranged from 5 to 40 with greater reduction rates found at higher original radon concentrations. Increasing ventilation in locations with moderately elevated radon concentrations (200 - 400 Bq/m 3 ) while not as effective as active systems produced on

  8. One hundred and twenty-five years of the Annals of Botany. Part 2: the years 1937 to 2012.

    Science.gov (United States)

    Jackson, Michael B

    2016-12-01

    Annals of Botany is a peer-reviewed plant biology journal. It was started in 1887, making it the oldest continuously published plant science title. A previous article [Jackson MB. 2015. One hundred and twenty-five years of the Annals of Botany Part 1: the first 50 years (1887-1936). Annals of Botany 115: : 1-18] summarized events leading to its founding, highlighted the individuals involved and examined the Journal's achievements and management practices over the first 50 years to 1937. This second article covers the next 75 years. The account draws principally on the Journal's own records, minute books, financial accounts, original letters and notes held by the Annals of Botany Company, the Journal's owners and managers. In 1937, its 51st year, the Journal was re-launched as Annals of Botany New Series and its volume numbers were reset to No. I. The present article evaluates the evolution of the New Series up to 2012, Annals of Botany's 125th anniversary year. The period includes a 2-year run-up to World War II, six war years and their immediate aftermath, and then on through increasingly competitive times. The ebb and flow of the Journal's fortunes are set against a roll-call of the often highly distinguished scientists who managed and edited the Journal. The article also examines an internal crisis in the 1980s that radically altered the Journal's organization in ways that were, ultimately, to its benefit. The narrative is set against changes to economic conditions in Great Britain over the period, to the evolving nature and geographical distribution of much experimental plant science and to the digital revolution that, from the late 20th century, transformed the workings of Annals of Botany and of scientific publishing more generally. © The Author 2016. Published by Oxford University Press on behalf of the Annals of Botany Company. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  9. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  10. Rat models of acute inflammation: a randomized controlled study on the effects of homeopathic remedies

    Directory of Open Access Journals (Sweden)

    Menniti-Ippolito Francesca

    2007-01-01

    Full Text Available Abstract Background One of the cardinal principles of homeopathy is the "law of similarities", according to which patients can be treated by administering substances which, when tested in healthy subjects, cause symptoms that are similar to those presented by the patients themselves. Over the last few years, there has been an increase in the number of pre-clinical (in vitro and animal studies aimed at evaluating the pharmacological activity or efficacy of some homeopathic remedies under potentially reproducible conditions. However, in addition to some contradictory results, these studies have also highlighted a series of methodological difficulties. The present study was designed to explore the possibility to test in a controlled way the effects of homeopathic remedies on two known experimental models of acute inflammation in the rat. To this aim, the study considered six different remedies indicated by homeopathic practice for this type of symptom in two experimental edema models (carrageenan- and autologous blood-induced edema, using two treatment administration routes (sub-plantar injection and oral administration. Methods In a first phase, the different remedies were tested in the four experimental conditions, following a single-blind (measurement procedure. In a second phase, some of the remedies (in the same and in different dilutions were tested by oral administration in the carrageenan-induced edema, under double-blind (treatment administration and measurement and fully randomized conditions. Seven-hundred-twenty male Sprague Dawley rats weighing 170–180 g were used. Six homeopathic remedies (Arnica montana D4, Apis mellifica D4, D30, Atropa belladonna D4, Hamamelis virginiana D4, Lachesis D6, D30, Phosphorus D6, D30, saline and indomethacin were tested. Edema was measured using a water-based plethysmometer, before and at different times after edema induction. Data were analyzed by ANOVA and Student t test. Results In the first phase

  11. "The First Twenty Years," by Bernard J. Siegel. Annual Review of Anthropology, 22 (1993, pp. 1-34, Annual Reviews, Inc, Palo Alto

    Directory of Open Access Journals (Sweden)

    James A. Delle

    1995-05-01

    Full Text Available After twenty years as editor of the Annual Review ofAnthropology (ARA, Professor Siegel took on a daunting task with this article. In his words, he set out to "ponder the developments in the several subfields of anthropol­ogy over this period of time, as reflected in the topics selected for review in this enterprise" (p. 8. To this end Siegel, a cultural anthropologist, mined the collective knowledge contained within twenty years of the ARA. In his presentation, he considers the intellectual developments within each of the five subdisciplines separately (he includes applied anthropology, concluding with some brief remarks on the importance of maintaining a four or five field approach to anthropology. For our purposes here, I will limit my comments to his section on archaeology.

  12. Twenty years research of chronic gamma-ray irradiation on seed crops

    International Nuclear Information System (INIS)

    Yamashita, Atsushi

    1983-01-01

    Twenty years of the works on the chronic gamma-ray irradiation of seed crops are summarized. Radiosensitivity and the mutation rate per unit exposure varies not only with the genetic factor but also depend on whether treatment is given to seeds or growing plants. The relation between the radiosensitivity of seeds and growing plants also varies with plant species. In Hordeum, Avena and Nicotiana, the highest mutation rate obtained by the chronic irradiation of growing plants is similar to that in seed irradiation, but in Oryza and Setalia, chronic irradiation was two to three times more effective for attaining a higher mutation rate. The mutation spectrum also varies with the mutagen, the factors modifying the effects of mutagen, and the dose of mutagen. The suitability of a particular mutagenic treatment to a species should be taken into consideration in the evaluation of mutagenic treatment. For instance, NaN 3 is highly mutagenic to barley, but less mutagenic to rice. The gene ea7 controlling the maturing earliness of barley seems to be mutable in chronic irradiation, and the mutants obtained by chronic irradiation are healthy. The author emphasized that the chronic irradiation at the gamma-field is a useful mutagenic treatment, even though some negative results have been reported in European countries. (Kaihara, S.)

  13. Herbal remedies: issues in licensing and economic evaluation.

    Science.gov (United States)

    Ashcroft, D M; Po, A L

    1999-10-01

    In recent years, the use of alternative therapies has become widespread. In particular, there has been a resurgence in the public's demand for herbal remedies, despite a lack of high-quality evidence to support the use of many of them. Given the increasing pressures to control healthcare spending in most countries, it is not surprising that attention is being focused on the cost effectiveness of herbal remedies. We address the question of whether there is sufficient information to enable the assessment of the cost effectiveness of herbal remedies. In so doing, we discuss the current state of play with several of the more high-profile alternative herbal remedies [Chinese medicinal herbs for atopic eczema, evening primrose oil, ginkgo biloba, hypericum (St John's wort)] and some which have made the transition from being alternative to being orthodox remedies. We use historical context to discuss, on the one hand, the increasing commodification of herbal remedies and on the other, the trend towards greater regulatory control and licensing of alternative herbal remedies. We argue that unless great care is exercised, these changes are not necessarily in the best interests of patients. In order to identify cost-effective care, we need reliable information about the costs as well as the efficacy and safety of the treatments being assessed. For most alternative therapies, such data are not available. We believe that studies to gather such data are long overdue. Whilst we argue strongly in favour of control of some herbal remedies, we urge caution with the trend towards licensing of all herbal remedies. We argue that the licensing of those herbal remedies with equivocal benefits and few risks, as evidenced by a long history of safe use, increases barriers to entry and increases societal healthcare costs.

  14. In Situ Remediation Integrated Program: Technology summary

    International Nuclear Information System (INIS)

    1994-02-01

    The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed

  15. In Situ Remediation Integrated Program: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed.

  16. Remediation of problematic residents--A national survey.

    Science.gov (United States)

    Bhatti, Nasir I; Ahmed, Aadil; Stewart, Michael G; Miller, Robert H; Choi, Sukgi S

    2016-04-01

    Despite careful selection processes, residency programs face the challenge of training residents who fall below minimal performance standards. Poor performance of a resident can endanger both patient safety and the reputation of the residency program. It is important, therefore, for a program to identify such residents and implement strategies for their successful remediation. The purpose of our study was to gather information on evaluation and remediation strategies employed by different otolaryngology programs. Cross-sectional survey. We conducted a national survey, sending a questionnaire to the program directors of 106 otolaryngology residency programs. We collected information on demographics of the program, identification of problematic residents, and remediation strategies. The response rate was 74.5%, with a 2% cumulative incidence of problematic residents in otolaryngology programs during the past 10 years. The most frequently reported deficiencies of problematic residents were unprofessional behavior with colleagues/staff (38%), insufficient medical knowledge (37%), and poor clinical judgment (34%). Personal or professional stress was the most frequently identified underlying problem (70.5%). Remediation efforts included general counseling (78%), frequent feedback sessions (73%), assignment of a mentor (58%), and extra didactics (47%). These remediation efforts failed to produce improvement in 23% of the identified residents, ultimately leading to their dismissal. The apparent deficiencies, underlying causes, and remediation strategies vary among otolaryngology residency programs. Based on the results of this survey, we offer recommendations for the early identification of problematic residents and a standardized remediation plan. NA. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  17. Twenty-year survivors of kidney transplantation.

    LENUS (Irish Health Repository)

    Traynor, C

    2012-12-01

    There have been few studies of patients with renal allografts functioning for more than 20 years. We sought to identify clinical factors associated with ultra long-term (>20 year) renal allograft survival and to describe the clinical features of these patients. We performed a retrospective analysis of the Irish Renal Transplant Database and included 1174 transplants in 1002 patients. There were 255 (21.74%) patients with graft function for 20 years or more. Multivariate analysis identified recipient age (HR 1.01, CI 1.01-1.02), gender (male HR 1.25, CI 1.08-1.45), acute rejection (HR 1.26, CI 1.09-1.45) and transplant type (living related donor vs. deceased donor) (HR 0.52, CI 0.40-0.66) as significantly associated with long-term graft loss. Median serum creatinine was 115 μmol\\/L. The 5-year graft survival in 20-year survivors was 74.7%. The mean age at death was 62.7 years (±10.6). The most common causes of death were cardiovascular disease and malignancy. The two major causes of graft loss were death (with function) and interstitial fibrosis\\/tubular atrophy. Comorbidities included skin cancer (36.1%), coronary heart disease (17.3%) and other malignancies (14.5%). This study identifies factors associated with long-term allograft survival and a high rate of morbidity and early mortality in long-term transplant recipients.

  18. Objective Assessment of General Surgery Residents Followed by Remediation.

    Science.gov (United States)

    Gas, Becca L; Buckarma, EeeLN H; Mohan, Monali; Pandian, T K; Farley, David R

    Surgical training programs often lack objective assessment strategies. Complicated scheduling characteristics frequently make it difficult for surgical residents to undergo formal assessment; actually having the time and opportunity to remediate poor performance is an even greater problem. We developed a novel methodology of assessment for residents and created an efficient remediation system using a combination of simulation, online learning, and self-assessment options. Postgraduate year (PGY) 2 to 5 general surgery (GS) residents were tested in a 5 station, objective structured clinical examination style event called the Surgical X-Games. Stations were 15 minutes in length and tested both surgical knowledge and technical skills. Stations were scored on a scale of 1 to 5 (1 = Fail, 2 = Mediocre, 3 = Pass, 4 = Good, and 5 = Stellar). Station scores ≤ 2 were considered subpar and required remediation to a score ≥ 4. Five remediation sessions allowed residents the opportunity to practice the stations with staff surgeons. Videos of each skill or test of knowledge with clear instructions on how to perform at a stellar level were offered. Trainees also had the opportunity to checkout take-home task trainers to practice specific skills. Residents requiring remediation were then tested again in-person or sent in self-made videos of their performance. Academic medical center. PGY2, 3, 4, and 5 GS residents at Mayo Clinic in Rochester, MN. A total of, 35 residents participated in the Surgical X-Games in the spring of 2015. Among all, 31 (89%) had scores that were deemed subpar on at least 1 station. Overall, 18 (58%) residents attempted remediation. All 18 (100%) achieved a score ≥ 4 on the respective stations during a makeup attempt. Overall X-Games scores and those of PGY2s, 3s, and 4s were higher after remediation (p remediation. Despite difficulties with training logistics and busy resident schedules, it is feasible to objectively assess most GS trainees and

  19. Twenty Years after Philippine Trade Liberalization and Industrialization: What Has Happened and Where Do We Go from Here

    OpenAIRE

    Aldaba, Rafaelita M.

    2013-01-01

    The paper aims to review our trade liberalization policy and its contribution to the country`s industrial growth and performance. After more than twenty years of liberalization, the overall performance of the manufacturing industry has been weak, growth has been slow, and contribution to value added and employment has been limited. Total factor productivity growth declined from 1996 to 2006. The industrial structure has remained "hollow" or "missing" in the middle and medium enterprises have ...

  20. Book review: Twenty-Five Years on the Cutting Edge of Obsidian Studies: Selected Readings from the IAOS Bulletin

    Directory of Open Access Journals (Sweden)

    Sean Dolan

    2017-03-01

    Full Text Available Edited by Carolyn D. Dillian (Coastal Carolina University, Twenty-Five Years on the Cutting Edge of Obsidian Studies: Selected Readings from the IAOS Bulletin consists of 19 previously published articles from the International Association for Obsidian Studies (IAOS Bulletin. Dillian selected these articles because they provide a range of methodological and theoretical approaches concerning archaeological obsidian studies from around the world like Eretria, California, and the Near East, for example.

  1. Hypopigmented mycosis fungoides in a twenty-year-old Saudi woman with fair skin

    Directory of Open Access Journals (Sweden)

    Al-Ratrout J

    2006-01-01

    Full Text Available The hypopigmented variant of mycosis fungoides (MF is charactrized by the presence of hypopigmented patches as the sole manifestation of the disease. This variant is usually observed in the dark skin of African or Asian individuals particularly children, but nevertheless is an uncommonly reported presentation of the disease. The incidence of hypopigmented MF in Caucasian patients and others of fair skin color is rare. We describe hypopigmented lesions arising in a twenty-year-old Saudi woman with type IV skin color. The diagnosis of mycosis fungoides stage IA was made based on the clinico-radiological and histological features. The patient responded well to PUVA therapy and is currently clear of lesions. MF should be considered in the differential diagnosis of hypopigmented macular lesions in patients of any skin color and age. Multiple skin biopsies must be performed on different occasions so as not to miss the diagnosis; and long term follow up is recommended since recurrence is common and occasional cases behave aggressively.

  2. Applications of Ecological Engineering Remedies for Uranium Processing Sites, USA

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, William [Navarro Research and Engineering

    2016-05-23

    The U.S. Department of Energy (USDOE) is responsible for remediation of environmental contamination and long-term stewardship of sites associated with the legacy of nuclear weapons production during the Cold War in the United States. Protection of human health and the environment will be required for hundreds or even thousands of years at many legacy sites. USDOE continually evaluates and applies advances in science and technology to improve the effectiveness and sustainability of surface and groundwater remedies (USDOE 2011). This paper is a synopsis of ecological engineering applications that USDOE is evaluating to assess the effectiveness of remedies at former uranium processing sites in the southwestern United States. Ecological engineering remedies are predicated on the concept that natural ecological processes at legacy sites, once understood, can be beneficially enhanced or manipulated. Advances in tools for characterizing key processes and for monitoring remedy performance are demonstrating potential. We present test cases for four ecological engineering remedies that may be candidates for international applications.

  3. 2014 Ohio Remediation Report

    Science.gov (United States)

    Ohio Board of Regents, 2014

    2014-01-01

    In fulfillment of Ohio Revised Code 3333.041 (A) (1) the Chancellor has published a listing by school district of the number of the 2013 high school graduates who attended a state institution of higher education in academic year 2013-2014 and the percentage of each district's graduates required by the institution to enroll in a remedial course in…

  4. Which Russia, twenty years later?

    Directory of Open Access Journals (Sweden)

    Carmen Claudín

    2011-12-01

    Full Text Available Russia is proud of its position among the emerging powers, of the strength provided by its ample energetic resources and its nuclear potential with which it can influence the world and always be taken into account. Nevertheless, the perception within the country is that stagnation has become Russia’s dominant characteristic at present. The objective of this article is to explore how this situation came about, analysing the evolution of domestic processes in Russia during both of its most defining periods: Yeltsin and Putin’s leadership, since the ephemeral presidency of Medvedev proved to be basically a continuation of the latter. During the eight years of Boris Yeltsin’s tenure, the state of crisis, latent or open, developed into the way that political processes are carried out in Russia. With Putin’s arrival, however, stability and State control are imposed, against the backdrop of economic growth, and they become values in themselves, far from the democratic discourse of the first years.

  5. A ''dog gone'' restoration project: Remediation of an AEC research facility

    International Nuclear Information System (INIS)

    Huff, P.E.; Brooks, B.T.

    1994-01-01

    This facility was established in 1958 by the Atomic Energy Commission. Research at the facility originally focused on the health effects from chronic exposures to radionuclides, primarily strontium 90 ( 90 Sr) and radium 226 ( 226 Ra), using beagles to simulate radiation effects on humans. In 1988 the Department of Energy (DOE) decided to close out the research program, shut down the facility and turn it over to the tenant after remediation. This paper examines the remediation activities relative to Animal Hospitals 1 and 2 (AH-1 and AH-2), the cobalt 60 ( 60 Co) source and the Specimen Storage Room. Remediation of this facility took place over one year period beginning in August 1992. Portions of the facility not requiring remediation are now a part of an ongoing research facility. While excluded from areas where remediation took place, facility personnel and others were in close proximity to the remediation, sometimes separated only by a common building wall. This close proximity required remediation techniques that stressed contamination control

  6. Electrodialytic soil remediation

    DEFF Research Database (Denmark)

    Karlsmose, Bodil; Ottosen, Lisbeth M.; Hansen, Lene

    1999-01-01

    The paper gives an overview of how heavy metals can be found in the soil and the theory of electrodialytic remediation. Basically electrodialytic remediation works by passing electric current through the soil, and the heavy metals in ionic form will carry some of the current. Ion-exchange membranes...... prevents the protons and the hydroxides ions from the electrode processes to enter the soil. The heavy metals are collected in a concentration compartment, which is separated from the soil by ion-exchange membranes. Examples from remediation experiments are shown, and it is demonstrated that it is possible...... to remediate soil polluted with heavy metals be this method. When adding desorbing agents or complexing agents, chosing the right current density, electrolyte and membranes, the proces can be optimised for a given remediation situation. Also electroosmosis is influencing the system, and if extra water...

  7. Fast-food consumption among 17-year-olds in the Birth to Twenty ...

    African Journals Online (AJOL)

    Objectives: Assessment of fast-food consumption in urban black adolescents. Design: The current research was a descriptive cross-sectional study. Setting: Subjects attending the Birth to Twenty (Bt20) research facility at the Chris Hani Baragwanath Hospital in Soweto, Johannesburg between September 2007 and May ...

  8. The efficacy and durability of radon remedial measures

    International Nuclear Information System (INIS)

    Cliff, K.D.; Naismith, S.P.; Scivyer, C.; Stephen, R.

    1994-01-01

    In the UK, over 16,000 homes, from an estimated 100,000, with annual average radon concentrations exceeding the UK Action Level of 200 Bq.m -3 have been discovered. Some 600 householders who have taken action have sought confirmatory measurements from NRPB. Results for 345 such homes are discussed. A number of remedied homes are being remeasured annually to determine the durability of the remedies: results for the first year follow-up measurements are given. In a separate exercise, homes having the highest radon levels known in the UK have been enrolled in a research programme of the Building Research Establishment. The results for 53 homes in which BRE surveyed, designed and supervised remedial work are presented. (author)

  9. Cognitive Deficits in Schizophrenia: Understanding the Biological Correlates and Remediation Strategies

    Science.gov (United States)

    Tripathi, Adarsh; Shukla, Rashmi

    2018-01-01

    Cognitive deficits are one of the core symptoms of schizophrenia that evolve during the course of schizophrenia, after being originated even before the onset of illness. Existing pharmacological and biological treatment modalities fall short to meet the needs to improve the cognitive symptoms; hence, various cognitive remediation strategies have been adopted to address these deficits. Research evidences suggest that cognitive remediation measures improve the functioning, limit disability bettering the quality of life. The functional outcomes of cognitive remediation in schizophrenia are resultant of neurobiological changes in specific brain areas. Recent years witnessed significant innovations in cognitive remediation strategies in schizophrenia. This comprehensive review highlights the biological correlates of cognitive deficits in schizophrenia and the remedial measures with evidence base. PMID:29397662

  10. DEVELOPMENT OF THE INFORMATION COMPETENCE OF THE ACADEMIC COMMUNITY: TWENTY YEARS AFTER

    Directory of Open Access Journals (Sweden)

    Glosiene, Audrone

    2006-12-01

    Full Text Available Twenty years ago, reading culture, library skills’ development used to be one of the core directions in research and teaching policy of the Department of Library Science at Vilnius University. Lateron, the topic was marginalized and today we return to the field that meanwhile has developed huge knowledge and experience base worldwide. A stimulus for the return was participation in BIBLIONOVA project. The aim of the article is to present a holistic approach towards information competency development in a modern academic institution. Prescriptive approach based on information literacy standards proved to be limited and not always effective in the academic environment.Information competency development is problem-specific, domain-specific, and disciplinespecific. It is interrelated with critical thinking, analytical skills as well as creativity and computerliteracy skills. Holistically, information competency development is an integral part of university’s life-long learning strategy. Critical success factors for information competency development areopen and problem-based learning and cooperative, inclusive strategies of the whole university. Academic libraries continue to play a major role in the process but the connections with faculty and administration in the process are of major importance.

  11. Overview: Microbial amendment of remediated soils for effective recycling

    Directory of Open Access Journals (Sweden)

    Kim Soo-Bin

    2017-01-01

    Full Text Available In recent years, various methods are being considered with appropriate amendments, not with conventional reclamation to recycle deteriorated soils after remediation as agricultural addition, backfilling and construction materials etc. Among these amendments, microbial amendments with effective microorganism(EMs are known to improve soil qualities such as fertility, strength and toxicity to be recycled into possible utilizations. This study indicates the possibility of recycling the remediated soils by using these EMs most efficiently. Soil samples will be collected from contaminated sites with either heavy metals or petroleum and will be remediated by bench-scale soil washing and thermal desorption. And then the remediated soils will be treated with easily obtainable inocula, substrates (culture media near our life and they are compared with commercial EM products in terms of the cost and efficiency. Also, after treating with a number of mixing ratios, soil properties of (1 fresh, (2 contaminated, (3 remediated (4 amended soils will be evaluated based on soil quality indicators depending on demands and the optimal mixing ratios which are effective than commercial EM products will be determined. The ratio derived from pre-tests could be applied on the remediated soils with pilot-scale in order to assess suitability for recycling and characterize correlation between soil properties and microbial amendments regarding contaminants and remediation, and furthermore for modelling. In conclusion, application of the established models on recycling remediated soils may help to dispose the remediated soils in future, including environmental and ecological values as well as economical values.

  12. Twenty years after the embargo

    International Nuclear Information System (INIS)

    Geller, H.; DeCicco, J.; Laitner, S.; Dyson, C.

    1994-01-01

    This paper reviews the direct and indirect oil import costs and examines actions that can be taken to reduce future imports. We find that the USA could greatly reduce its oil imports during the next 20 years by increasing energy efficiency and accelerating the introduction of fuels derived from renewable energy sources, particularly in the transport sector. (author)

  13. Twenty years of the national program of surveillance radiation of the atmosphere and terrestrial environment; Veinte anos del programa nacional de vigilancia radiologica de la atmosfera y medio terrestre

    Energy Technology Data Exchange (ETDEWEB)

    Rey del Castillo, C.; Luque Heredia, S.; Marugan Tovar, I.; Salas Collantes, R.; Serling Carmona, A.; Lorente Lorente, P.; Ramos Salvador, L.

    2013-07-01

    This paper presents a global basis the information provided by the program in twenty years of operation, describing the main changes introduced and analyzing how they have influenced the results. The use of program data to inform and in response to questions from individuals or incidents is reviewed. And finally the prospects and major milestones expected to address in the next twenty years are described. (Author)

  14. Twenty Years of National Minority Protection in the Republic of Croatia

    Directory of Open Access Journals (Sweden)

    Siniša Tatalović

    2011-12-01

    Full Text Available The paper contains a review of policies towards national minorities in the Republic of Croatia in the past twenty years, with reference to the perspective of minority rights implementation. The topic has been analysed in relation to two independent variables – the influence of external factors, i.e. the international community, and internal political processes that have had influence on the realisation of national minority rights. Today, as a country and society on the eve of accession to the European Union, along with a legislatively developed and institutionally branched model of the implementation of national minority rights, we can not claim to have established permanent protection of their rights. The degree of national minority integration in society is the only true indicator of policy success in relation to national minorities. The goal of this policy ought to be complete integration of national minorities into public, cultural, economic and political life, but accompanied by the preservation of their cultural and national identity. The Croatian model has been set up in such a way, but the manner in which it functions will depend on the political will to implement it, the willingness of national minority members to be active subjects of social and political life, as well as on civil society and Croatian society as a whole.

  15. Higher Alu methylation levels in catch-up growth in twenty-year-old offsprings.

    Directory of Open Access Journals (Sweden)

    Kittipan Rerkasem

    Full Text Available Alu elements and long interspersed element-1 (LINE-1 or L1 are two major human intersperse repetitive sequences. Lower Alu methylation, but not LINE-1, has been observed in blood cells of people in old age, and in menopausal women having lower bone mass and osteoporosis. Nevertheless, Alu methylation levels also vary among young individuals. Here, we explored phenotypes at birth that are associated with Alu methylation levels in young people. In 2010, 249 twenty-years-old volunteers whose mothers had participated in a study association between birth weight (BW and nutrition during pregnancy in 1990, were invited to take part in our present study. In this study, the LINE-1 and Alu methylation levels and patterns were measured in peripheral mononuclear cells and correlated with various nutritional parameters during intrauterine and postnatal period of offspring. This included the amount of maternal intake during pregnancy, the mother's weight gain during pregnancy, birth weight, birth length, and the rate of weight gain in the first year of life. Catch-up growth (CUG was defined when weight during the first year was >0.67 of the standard score, according to WHO data. No association with LINE-1 methylation was identified. The mean level of Alu methylation in the CUG group was significantly higher than those non-CUG (39.61% and 33.66 % respectively, P < 0.0001. The positive correlation between the history of CUG in the first year and higher Alu methylation indicates the role of Alu methylation, not only in aging cells, but also in the human growth process. Moreover, here is the first study that demonstrated the association between a phenotype during the newborn period and intersperse repetitive sequences methylation during young adulthood.

  16. About Chernobyl - Twenty Years Later

    International Nuclear Information System (INIS)

    Tubiana, M.

    2006-01-01

    The author discusses the reactor accident of Chernobyl, the information on its consequences so contradictory in the former USSR countries, the status of the effects observed, the forecasting concerning the onset of cancers in the coming years among the populations that were exposed to radiations, the public opinion facing the pessimists. He concludes on the lessons which can be drawn from Chernobyl. (A.L.B.)

  17. Topical Day on Site Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Vandenhove, H [ed.

    1996-09-18

    Ongoing activities at the Belgian Nuclear Research Centre relating to site remediation and restoration are summarized. Special attention has been paid to the different phases of remediation including characterization, impact assessment, evaluation of remediation actions, and execution of remediation actions.

  18. Strategy paper. Remedial design/remedial action 100 Area. Revision 2

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1995-10-01

    This strategy paper identifies and defines the approach for remedial design and remedial action (RD/RA) for source waste sites in the 100 Area of the Hanford Site, located in southeastern Washington State. This paper provides the basis for the US Department of Energy (DOE) to assess and approve the Environmental Restoration Contractor's (ERC) approach to RD/RA. Additionally, DOE is requesting review/agreement from the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) on the strategy presented in this document in order to expedite remedial activities

  19. Data base management activities for the Remedial Action Program at ORNL, calendar year 1987

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; McCord, R.A.; Faulkner, M.A.; Newman, K.A.; Owen, P.T.

    1988-05-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in FY 1985 to apply corrective measures at areas contaminated with radioactive and/or hazardous chemical wastes. To achieve this goal, numerous and varied studies are being conducted to characterize the waste disposal sites. Environmental data collected in support of other programs at ORNL are also of use to RAP. These studies are generating a voluminous amount of data on a scale unprecedented for ORNL. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. 10 refs., 25 figs., 16 tabs

  20. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    International Nuclear Information System (INIS)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, and eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs

  1. Industries processing naturally occurring radioactive materials: twenty years of emission data in the Netherlands

    International Nuclear Information System (INIS)

    Tanzi, C.P.

    2008-01-01

    This paper provides a review of the dose assessment of discharges to air of two industries processing NORM (Naturally Occurring Radioactive Materials) in the Netherlands. An industrial plant producing elemental phosphorus (thermal process, unique within Europe) reports since 1987 its emission data to the Dutch Ministry of the Environment (VROM: Ministry of Housing, Spatial Planning and the Environment). This plant accounts for the highest release of Po-210 to air in the Netherlands, with a yearly average of approximately 500 GBq. Other significant NORM discharges to air arise from an industrial plant with blast-furnaces for steel production. Yearly discharges fall under permit, and are reported, since 1993. RIVM, the National Institute for Public Health and the Environment, is tasked by the Ministry to assess the dose to the general public arising from these discharges to air. Air transport modelling is used to determine both air concentration (for inhalation exposure) and deposition rate of the radionuclides. A (conservative) committed ingestion dose is determined by modelling the uptake of radionuclides from contaminated farmland, and assuming a food basket to be fairly representative for the population of the Netherlands. Discharges to water in the Netherlands have decreased in the past twenty years, due both to the closure of two phosphoric acid plants a decade ago and the improved treatment of waste fluids by other NORM industries. The collective dose assessed from discharges to air since 1987 is presented here. (author)

  2. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  3. Application of boreal forest toxicity data in the decision-making process for contaminated soil clean-up remediation at oil and gas fields in Western Canada

    International Nuclear Information System (INIS)

    Scroggins, R.; Princz, J.; Moody, M.; Olsgard-Dumanski, M.; Haderlein, L.; Moore, B.

    2010-01-01

    This presentation reported on a multi-year research project in which a broad range of boreal forest test methods for assessing petroleum hydrocarbon (PHC) toxicity in contaminated soil were used to show that clean-up decisions can be made on a field-wide basis through focused biological testing of typical drill sump and flare pit locations within an oil and gas field. Remediation at most sites will likely be limited to the Alberta soil eco-contact guidelines for PHC F2 and F3 fractions. Since Tier 1 eco-contact guidelines are derived using toxicity data from fresh crude and using agricultural plant species, it was more logical to follow a Tier 2 eco-contact pathway approach because most contamination was related to drilling sumps and flare pits containing highly weathered PHCs and species native to the boreal eco-zone of Canada. The site-specific remedial objective (SSRO) option within the Tier 2 guideline was used because of the large number of sites requiring remediation, and the similarity of sites within pre-determined Risk Assessment Zones. For representative contaminated soils, a SSRO was derived from the twenty-fifth percentile of the estimated species sensitivity distribution of all acceptable boreal plant, earthworm, springtail and mite test endpoints. The purpose of the project was to reduce soil volumes sent to landfill during site remediation by showing that residual impacts from weathered PHC in soil do not have damaging effects on boreal forest receptors following remediation. Data was included to show the value of this approach and the variability between sites and their effect on regionalizing a Tier 2 eco-contact guideline.

  4. Application of boreal forest toxicity data in the decision-making process for contaminated soil clean-up remediation at oil and gas fields in Western Canada

    Energy Technology Data Exchange (ETDEWEB)

    Scroggins, R.; Princz, J. [Environment Canada, Ottawa, ON (Canada); Moody, M. [Saskatchewan Research Council, Regina, SK (Canada); Olsgard-Dumanski, M.; Haderlein, L. [WorleyParsons Canada, Calgary, AB (Canada); Moore, B. [Devon Canada Corp., Calgary, AB (Canada)

    2010-07-01

    This presentation reported on a multi-year research project in which a broad range of boreal forest test methods for assessing petroleum hydrocarbon (PHC) toxicity in contaminated soil were used to show that clean-up decisions can be made on a field-wide basis through focused biological testing of typical drill sump and flare pit locations within an oil and gas field. Remediation at most sites will likely be limited to the Alberta soil eco-contact guidelines for PHC F2 and F3 fractions. Since Tier 1 eco-contact guidelines are derived using toxicity data from fresh crude and using agricultural plant species, it was more logical to follow a Tier 2 eco-contact pathway approach because most contamination was related to drilling sumps and flare pits containing highly weathered PHCs and species native to the boreal eco-zone of Canada. The site-specific remedial objective (SSRO) option within the Tier 2 guideline was used because of the large number of sites requiring remediation, and the similarity of sites within pre-determined Risk Assessment Zones. For representative contaminated soils, a SSRO was derived from the twenty-fifth percentile of the estimated species sensitivity distribution of all acceptable boreal plant, earthworm, springtail and mite test endpoints. The purpose of the project was to reduce soil volumes sent to landfill during site remediation by showing that residual impacts from weathered PHC in soil do not have damaging effects on boreal forest receptors following remediation. Data was included to show the value of this approach and the variability between sites and their effect on regionalizing a Tier 2 eco-contact guideline.

  5. Remediation techniques for heavy metal-contaminated soils: Principles and applicability.

    Science.gov (United States)

    Liu, Lianwen; Li, Wei; Song, Weiping; Guo, Mingxin

    2018-08-15

    Globally there are over 20millionha of land contaminated by the heavy metal(loid)s As, Cd, Cr, Hg, Pb, Co, Cu, Ni, Zn, and Se, with the present soil concentrations higher than the geo-baseline or regulatory levels. In-situ and ex-situ remediation techniques have been developed to rectify the heavy metal-contaminated sites, including surface capping, encapsulation, landfilling, soil flushing, soil washing, electrokinetic extraction, stabilization, solidification, vitrification, phytoremediation, and bioremediation. These remediation techniques employ containment, extraction/removal, and immobilization mechanisms to reduce the contamination effects through physical, chemical, biological, electrical, and thermal remedy processes. These techniques demonstrate specific advantages, disadvantages, and applicability. In general, in-situ soil remediation is more cost-effective than ex-situ treatment, and contaminant removal/extraction is more favorable than immobilization and containment. Among the available soil remediation techniques, electrokinetic extraction, chemical stabilization, and phytoremediation are at the development stage, while the others have been practiced at full, field scales. Comprehensive assessment indicates that chemical stabilization serves as a temporary soil remediation technique, phytoremediation needs improvement in efficiency, surface capping and landfilling are applicable to small, serious-contamination sites, while solidification and vitrification are the last remediation option. The cost and duration of soil remediation are technique-dependent and site-specific, up to $500ton -1 soil (or $1500m -3 soil or $100m -2 land) and 15years. Treatability studies are crucial to selecting feasible techniques for a soil remediation project, with considerations of the type and degree of contamination, remediation goals, site characteristics, cost effectiveness, implementation time, and public acceptability. Copyright © 2018 Elsevier B.V. All rights

  6. Selection of monitoring times to assess remediation performance

    Energy Technology Data Exchange (ETDEWEB)

    Kueper, B.H.; Mundle, K. [Queen' s Univ., Kingston, ON (Canada). Dept. of Civil Engineering, Geoengineering Centre

    2007-07-01

    Several factors determine the time needed for a plume to respond to non-aqueous phase liquid (NAPL) source zone remediation. Most spills of NAPLs (fuels, chlorinated solvents, PCB oils, creosote and coal tar) require mass removal in order to implement remediation technologies such as chemical oxidation, thermal treatments, alcohol flushing, surfactant flushing and hydraulic displacement. While much attention has been given to the development of these remediation technologies, little attention has been given to the response of the plume downstream of the treatment zone and selection of an appropriate monitoring time scale to adequately evaluate the impacts of remediation. For that reason, this study focused on the prevalence of diffusive sinks, the mobility of the contaminant and the hydraulic conductivity of subsurface materials. Typically, plumes in subsurface environments dominated by diffusive sinks or low permeability materials need long periods of time to detach after source removal. This paper presented generic plume response model simulations that illustrated concentration rebound following the use of in-situ chemical oxidation in fractured clay containing trichloroethylene. It was determined that approximately 2 years are needed to reach peak rebound concentration after cessation remedial action. It was concluded that downgradient monitoring well concentrations may be greatly reduced during remedial action due to the fact that oxidant occupies the fracture and because oxidant diffuses into the clay matrix, creating a short period of contaminant reduction in the area of flowing groundwater. 9 refs., 2 tabs., 7 figs.

  7. Selection of monitoring times to assess remediation performance

    International Nuclear Information System (INIS)

    Kueper, B.H.; Mundle, K.

    2007-01-01

    Several factors determine the time needed for a plume to respond to non-aqueous phase liquid (NAPL) source zone remediation. Most spills of NAPLs (fuels, chlorinated solvents, PCB oils, creosote and coal tar) require mass removal in order to implement remediation technologies such as chemical oxidation, thermal treatments, alcohol flushing, surfactant flushing and hydraulic displacement. While much attention has been given to the development of these remediation technologies, little attention has been given to the response of the plume downstream of the treatment zone and selection of an appropriate monitoring time scale to adequately evaluate the impacts of remediation. For that reason, this study focused on the prevalence of diffusive sinks, the mobility of the contaminant and the hydraulic conductivity of subsurface materials. Typically, plumes in subsurface environments dominated by diffusive sinks or low permeability materials need long periods of time to detach after source removal. This paper presented generic plume response model simulations that illustrated concentration rebound following the use of in-situ chemical oxidation in fractured clay containing trichloroethylene. It was determined that approximately 2 years are needed to reach peak rebound concentration after cessation remedial action. It was concluded that downgradient monitoring well concentrations may be greatly reduced during remedial action due to the fact that oxidant occupies the fracture and because oxidant diffuses into the clay matrix, creating a short period of contaminant reduction in the area of flowing groundwater. 9 refs., 2 tabs., 7 figs

  8. Trade-offs between worker risk and public risk during remediation at DOE sites

    International Nuclear Information System (INIS)

    Beam, B.N.; Morris, J.; Blaylock, B.; Travis, C.

    1995-01-01

    Within the next 30 years, the US Department of Energy (DOE) Environmental Restoration Program will be responsible for remediating thousands of waste sites across the DOE complex. A major concern during remediation will be the protection of thousands of workers engaged in the remediation. In addition to well know safety hazards associated with conventional construction operations, remedial workers at DOE will encounter radiation and chemical exposures from radioactive, hazardous, and mixed waste. Although historically represented as minimal due to a paucity of data related to worker exposures during remediation, potential worker health risk is an important factor that must be taken into account in the selection of remedial strategies, and the potential risk reduction offered by a remedial strategy must be weighed against the potential worker risk incurred during its implementation. Analysis has shown a trend that the worker risk incurred outweighs,the benefits of risk reduction to the public

  9. Establishing the R&D Agenda for Twenty-First Century Learning

    Science.gov (United States)

    Kay, Ken; Honey, Margaret

    2006-01-01

    Much ink has flowed over the past few years describing the need to incorporate twenty-first century skills into K-12 education. Preparing students to succeed as citizens, thinkers, and workers--the bedrock of any educational system--in this environment means arming them with more than a list of facts and important dates. Infusing twenty-first…

  10. The observational approach for site remediation at federal facilities

    International Nuclear Information System (INIS)

    Myers, R.S.; Gianti, S.J.

    1989-11-01

    The observational approach, developed by geotechnical engineers to cope with the uncertainty associated with subsurface construction such as tunnels and dams, can be applied to hazardous waste site remediation. During the last year, the observational approach has gained increasing attention as a means of addressing the uncertainties involved in site remediation. In order to evaluate the potential advantages and constraints of applying the observational approach to site restoration at federal facilities, a panel of scientists and engineers from Pacific Northwest Laboratory and CH2M Hill was convened. Their review evaluated potential technical and institutional advantages and constraints that may affect the use of the observational approach for site remediation. This paper summarizes the panel's comments and conclusions about the application of the observational approach to site remediation at federal facilities. Key issues identified by the panel include management of uncertainty, cost and schedule, regulations and guidance, public involvement, and implementation. 5 refs

  11. Cortical Signatures of Dyslexia and Remediation: An Intrinsic Functional Connectivity Approach

    Science.gov (United States)

    Koyama, Maki S.; Di Martino, Adriana; Kelly, Clare; Jutagir, Devika R.; Sunshine, Jessica; Schwartz, Susan J.; Castellanos, Francisco X.; Milham, Michael P.

    2013-01-01

    This observational, cross-sectional study investigates cortical signatures of developmental dyslexia, particularly from the perspective of behavioral remediation. We employed resting-state fMRI, and compared intrinsic functional connectivity (iFC) patterns of known reading regions (seeds) among three dyslexia groups characterized by (a) no remediation (current reading and spelling deficits), (b) partial remediation (only reading deficit remediated), and (c) full remediation (both reading and spelling deficits remediated), and a group of age- and IQ-matched typically developing children (TDC) (total N = 44, age range = 7–15 years). We observed significant group differences in iFC of two seeds located in the left posterior reading network – left intraparietal sulcus (L.IPS) and left fusiform gyrus (L.FFG). Specifically, iFC between L.IPS and left middle frontal gyrus was significantly weaker in all dyslexia groups, irrespective of remediation status/literacy competence, suggesting that persistent dysfunction in the fronto-parietal attention network characterizes dyslexia. Additionally, relative to both TDC and the no remediation group, the remediation groups exhibited stronger iFC between L.FFG and right middle occipital gyrus (R.MOG). The full remediation group also exhibited stronger negative iFC between the same L.FFG seed and right medial prefrontal cortex (R.MPFC), a core region of the default network These results suggest that behavioral remediation may be associated with compensatory changes anchored in L.FFG, which reflect atypically stronger coupling between posterior visual regions (L.FFG-R.MOG) and greater functional segregation between task-positive and task-negative regions (L.FFG-R.MPFC). These findings were bolstered by significant relationships between the strength of the identified functional connections and literacy scores. We conclude that examining iFC can reveal cortical signatures of dyslexia with particular promise for monitoring

  12. Is Sustainable Remediation Now a Self-Sustaining Process? an International Progress Report

    Science.gov (United States)

    Smith, J. W. N.

    2014-12-01

    Sustainable remediation - the consideration of environmental, social and economic factors associated with soil and groundwater risk-management options, to help select the best overall solution - has been a rapidly evolving topic in recent years. The first published reference[1] to 'sustainable remediation' was in the title of a 1999 conference paper by Kearney et al., (1999), but activity really accelerated in the middle-late 2000's, with establishment of a number of collaborative sustainable remediation groups and fora, and increased publication rates in the peer reviewed literature (Fig 1). Figure 1. Journal paper publications with search term 'sustainable remediation' (SCOPUS survey, 17 July 2014) This presentation will review the international progress of sustainable remediation concept development and application in regulatory and corporate decision-making processes. It will look back at what has already been achieved, provide an update on the latest initiatives and developments, and look forward to what the future of sustainable remediation might look like. Specifically it will describe: Sustainable remediation frameworks: synergies and international collaboration; Latest guidance and tools developed by the various sustainable remediation organisations (SuRFs), including the SuRF-UK Best Management Practices and Tier 1 Briefcase; Best practice standard development by ASTM and ISO; Regulatory acceptance of sustainable remediation, including incorporation into legislation, and the NICOLE - Common Forum Joint statement on 'risk-informed and sustainable remediation' in Europe; Examples of corporate adoption of sustainable remediation principles. The presentation will conclude with a look forward to a vision of sustainable remediation in 2020.

  13. Functional remediation components: A conceptual method of evaluating the effects of remediation on risks to ecological receptors.

    Science.gov (United States)

    Burger, Joanna; Gochfeld, Michael; Bunn, Amoret; Downs, Janelle; Jeitner, Christian; Pittfield, Taryn; Salisbury, Jennifer

    2016-01-01

    Governmental agencies, regulators, health professionals, tribal leaders, and the public are faced with understanding and evaluating the effects of cleanup activities on species, populations, and ecosystems. While engineers and managers understand the processes involved in different remediation types such as capping, pump and treat, and natural attenuation, there is often a disconnect between (1) how ecologists view the influence of different types of remediation, (2) how the public perceives them, and (3) how engineers understand them. The overall goal of the present investigation was to define the components of remediation types (= functional remediation). Objectives were to (1) define and describe functional components of remediation, regardless of the remediation type, (2) provide examples of each functional remediation component, and (3) explore potential effects of functional remediation components in the post-cleanup phase that may involve continued monitoring and assessment. Functional remediation components include types, numbers, and intensity of people, trucks, heavy equipment, pipes, and drill holes, among others. Several components may be involved in each remediation type, and each results in ecological effects, ranging from trampling of plants, to spreading invasive species, to disturbing rare species, and to creating fragmented habitats. In some cases remediation may exert a greater effect on ecological receptors than leaving the limited contamination in place. A goal of this conceptualization is to break down functional components of remediation such that managers, regulators, and the public might assess the effects of timing, extent, and duration of different remediation options on ecological systems.

  14. ANALYSIS OF REMEDIATION PROCESS OF THE GROUDWATER COTAMINATION IN AN ILLEGAL DUMPING SITE

    Science.gov (United States)

    Nishida, Norikazu; Furuichi, Toru; Ishii, Kazuei

    Among on-site remediation technologies applied to illegal dumping sites, a technology to remedy contaminated groundwater without removal of the dumped waste is expected to provide a great opportunity to fulfill a societal need due to its economic advantage compared to removal of all waste. However heterogeneously-distributed waste makes the remedial process difficult. In this study, an in situflushing technology was applied to an illegal dumping site in Kuwana city, Mie, in order to remedy groundwater contaminated with several volatile organic compounds (VOCs) within five years. The key to successfully achieve the target was to conduct a series of advanced remediation processes; introducing a new indicator by which multiple VOCs can be estimated integratelly, monitoring the progress of remediation with a contour map of VOC concentration as well as the weighted averages of the concentration derived from the indicator, pinpointing residual contaminants area, reexamining the plan, and taking additional steps that promote further remediation.

  15. Electrokinetic remediation of copper mine tailings

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Rojo, Adrián; Ottosen, Lisbeth M.

    2007-01-01

    Important process parameters to optimize in electrokinetic soil remediation are those influencing remediation time and power consumption since these directly affect the cost of a remediation action. This work shows how the electrokinetic remediation (EKR) process could be improved by implementing...... bipolar electrodes in the porous material. The bipolar electrodes in EKR meant two improvements: (1) a shorter migration pathway for the contaminant, and (2) an increased electrical conductivity in the remediation system. All together the remediation proceeded faster with lower electrical resistance than...... in similar experiments but without the bipolar electrodes. The new electrokinetic remediation design was tested on copper mine tailings with different applied electric fields, remediation times and pre-treatment. The results showed that the copper removal was increased from 8% (applying 20V for 8 days...

  16. Remediation planning and risk assessment support through data fusion technology

    International Nuclear Information System (INIS)

    1996-01-01

    Coleman Research's Data Fusion Modeling (DFM) services gives one the ability to use large geophysical and hydrological data sets, which include direct and indirect measurements, to obtain a unified mathematical model of the geology and hydrology at one's site. Coleman Research (CRC) has adapted highly stable and efficient statistical inversion techniques, developed over the past 20 years, to provide a 3D site model with quantified uncertainty based on state-of-the-art modeling codes. This site model supports risk assessment and remediation planning with enhanced numerical accuracy for tradeoff studies of alternate remediation strategies. Further, DFM supports real time model updates during remediation and site investigation

  17. Twenty years after the Chernobyl accident

    International Nuclear Information System (INIS)

    2006-01-01

    Full text: The April 1986 accident at the Chernobyl nuclear power plant remains a painful memory in the lives of the hundreds of thousands of people who were most affected by the accident. In addition to the emergency rescue workers who died, thousands of children contracted thyroid cancer, and thousands of other individuals will eventually die of other cancers caused by the release of radiation. Vast areas of cropland, forests, rivers and urban centres were contaminated by environmental fallout. Hundreds of thousands of people were evacuated from these affected areas - forced to leave behind their homes, possessions, and livelihoods - and resettled elsewhere, in a traumatic outcome that has had long-lasting psychological and social impacts. The commemoration of the Chernobyl tragedy is taking place in many forums this month - in Minsk, in Kiev and in other locations. At the IAEA, it might be said that we have been responding to the accident and its consequences for twenty years, in a number of ways: first, through a variety of programmes designed to help mitigate the environmental and health consequences of the accident; second, by analyzing the lessons of what went wrong to allow such an accident to occur at all; and third, by working to prevent any such accident from occurring in the future. Building a strong and effective global nuclear safety regime is a central objective of our work. This requires effective international cooperation. The explosions that destroyed the Unit 4 reactor core, and discharged its contents in a cloud of radionuclides, made painfully clear that the safety risks associated with nuclear and radiological activities extend beyond national borders. International cooperation on nuclear safety matters - sharing information, setting clear safety standards, assisting with safety upgrades, and reviewing operational performance - has therefore become a hallmark of IAEA activity, particularly at a time when we are witnessing an expansion of

  18. ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2009

    Energy Technology Data Exchange (ETDEWEB)

    FORSYTHE, HOWARD S

    2010-04-14

    This Annual Report presents the data and evaluates the progress of the three-component remedy implemented for remediation of groundwater contamination at Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory Site. Overall, each component is achieving progress toward the goal of total plume remediation. In situ bioremediation operations in the hot spot continue to operate as planned. Progress toward the remedy objectives is being made, as evidenced by continued reduction in the amount of accessible residual source and decreases in downgradient contaminant flux, with the exception of TAN-28. The injection strategy is maintaining effective anaerobic reductive dechlorination conditions, as evidenced by complete degradation of trichloroethene and ethene production in the biologically active wells. In the medial zone, the New Pump and Treat Facility operated in standby mode. Trichloroethene concentrations in the medial zone wells are significantly lower than the historically defined concentration range of 1,000 to 20,000 μg/L. The trichloroethene concentrations in TAN-33, TAN-36, and TAN-44 continue to be below 200 μg/L. Monitoring in the distal zone wells outside and downgradient of the plume boundary demonstrate that some plume expansion has occurred, but less than the amount allowed in the Record of Decision Amendment. Additional data need to be collected for wells in the monitored natural attenuation part of the plume to confirm that the monitored natural attenuation part of the remedy is proceeding as predicted in the modeling.

  19. Soil Contamination and Remediation Strategies. Current research and future challenge

    Science.gov (United States)

    Petruzzelli, G.

    2012-04-01

    Soil contamination: the heritage of industrial development Contamination is only a part of a whole set of soil degradation processes, but it is one of paramount importance since soil pollution greatly influences the quality of water, food and human health. Soil contamination has been identified as an important issue for action in the European strategy for soil protection, it has been estimated that 3.5 million of sites are potentially contaminated in Europe. Contaminated soils have been essentially discovered in industrial sites landfills and energy production plants, but accumulation of heavy metals and organic compounds can be found also in agricultural land . Remediation strategies. from incineration to bioremediation The assessment of soil contamination is followed by remedial action. The remediation of contaminated soils started using consolidates technologies (incineration inertization etc.) previously employed in waste treatment,. This has contributed to consider a contaminated soil as an hazardous waste. This rough approximation was unfortunately transferred in many legislations and on this basis soil knowledge have been used only marginally in the clean up procedures. For many years soil quality has been identified by a value of concentration of a contaminant and excavation and landfill disposal of soil has been largely used. In the last years the knowledge of remediation technology has rapidly grown, at present many treatment processes appear to be really feasible at field scale, and soil remediation is now based on risk assessment procedures. Innovative technologies, largely dependent on soil properties, such as in situ chemical oxidation, electroremediation, bioventing, soil vapor extraction etc. have been successfully applied. Hazardous organic compounds are commonly treated by biological technologies, biorememdiation and phytoremediation, being the last partially applied also for metals. Technologies selection is no longer exclusively based on

  20. Twenty years of student sexual behavior: subcultural adaptations to a changing health environment.

    Science.gov (United States)

    Netting, Nancy S; Burnett, Matthew L

    2004-01-01

    This twenty-year study analyzes changes in sexual behavior among students at Okanagan University College in British Columbia, Canada. Surveys conducted in 1980, 1990, and 2000 reveal a steady increase in safer sexual practices. Most students now question potential partners about their past, use condoms with a new sexual partner, and maintain fairly long-term monogamous relationships. Three sexual subcultures continue to coexist in fairly stable proportions: celibacy (about 30%), monogamy (about 60%), and free experimentation (about 10%). Each subculture has created its own response to the danger of HIV/AIDS: celibates exaggerate the danger they face, monogamists rely on love and fidelity for protection, and free experimenters have increased their use of condoms. While romantic feelings lead many monogamous couples to abandon condoms without objective HIV/AIDS knowledge, free experimenters still face the highest risk. Although they now use condoms more than half the time, their lifestyle, which involves multiple partners, risky sexual acts, and frequent drug and/or alcohol use, clearly remains dangerous. The persistence of distinct subcultures has implications for health education programs, which would be most effective if based on key values held by specific target groups.

  1. Health of Europeans twenty years after the fall of Berlin wall.

    Science.gov (United States)

    Ginter, E; Simko, V

    2010-01-01

    The failure of central planning in the totalitarian systems of the USSR and its satellites adversely affected not only the economy and social relations but also the population health. While in the countries with established democracy (DEM) the general health and the life expectancy (LE) steadily improved, in countries declaring socialism (SOC) the LE was stagnant and in the USSR even decreased. Dramatic changes in Russia after the demise of Soviet Union resulted in an extraordinary destabilization of LE that reached a minimum in 1994. Remarkably, even twenty years after the breakdown of the Iron Curtain there persists a gap in the general health between the DEM and the SOC regions of Europe. Within the territory of the former Soviet influence there are additional differences in LE: Central Europe is much better off than Russia and its neighbours. Main cause of relatively high mortality in the post totalitarian Europe is the cardiovascular disease (CVD). Among females about 80% difference in LE between DEM and SOC countries is related to premature CVD mortality. In SOC males compared to DEM, about 50% of the higher mortality is caused by CVD, 20% is related to external factors (trauma, suicide) and 10% is oncologic disorders. The main suggested cause of such excess mortality, besides a low socioeconomic level and limited funding for health care, is an improper life style: alcoholism, smoking and inadequate intake of protective nutrients. Alcoholism, especially binge drinking is a prominent factor in Russia, Belarus, Ukraine and in the Baltic Republics (Fig. 6, Tab. 4, Ref. 20).

  2. EM-54 Technology Development In Situ Remediation Integrated Program

    International Nuclear Information System (INIS)

    1993-08-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) as an element of Environmental Restoration and Waste Management (EM) in November 1989. EM manages remediation of all DOE sites as well as wastes from current operations. The goal of the EM program is to minimize risks to human health, safety and the environment, and to bring all DOE sites into compliance with Federal, state, and local regulations by 2019. EM-50 is charged with developing new technologies that are safer, more effective and less expensive than current methods. The In Situ Remediation Integrated Program (the subject of this report) is part of EM-541, the Environmental Restoration Research and Development Division of EM-54. The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: Significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces; in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP tends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years

  3. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  4. The second twenty-five years.

    Science.gov (United States)

    Kippley, J F

    1993-01-01

    Between 1964 and 1968, the liberal Catholic press had prepared the laity for the change expected to occur after the release of Pope Paul VI's encyclical "Humanae Vitae," but almost no one read it when it was released in July 1968. The media gave the impression that no one agreed with the Pope. The Archbishop of Baltimore denounced his dissenting priests. The media publicized the discord, resulting in his fellow bishops not supporting him or the Pope. Sound theology was limited then. Today many Catholic leaders and scholars openly defend the encyclical, e.g., since 1978, Pope John Paul II has supported the doctrine of marital noncontraception. Pope Pius XII called for every woman to breast feed. The 1969 publication of the Breastfeeding and Natural Child Spacing was the catalyst for 10 years of research which confirmed breast feeding's contraceptive effect. Family planning specialists and demographers agreed in the Bellagio Consensus in 1988 that mothers who practiced exclusive breast feeding and were amenorrheic need not use a contraceptive for the first 6 months postpartum. Recent research shows that this rule depends on the population, e.g., women in Bangladesh meeting the criteria do not need to use contraceptives for 1 year. Few natural family planning groups existed in 1968 (e.g., 1 diocese), but today there are natural family planning teachers in 49 US states and in 13 countries. Some Catholics are calling for couples wanting to marry to take a course in natural family planning. The media widely publicized the new unnatural family planning methods, especially the pill. Recently a baby magazine allocated natural family planning 2/3rd of a page. A reporter for the "Washington Post" plans to interview a Catholic leader about natural family planning, completely on his/her own initiative.

  5. Cost-effectiveness analysis of radon remediation in schools

    International Nuclear Information System (INIS)

    Kennedy, C.A.; Gray, A.M.

    2000-01-01

    Indoor radon is an important source of radiation dosage in the general population and has been recognised as a world-wide environmental and public health challenge. Governments in many Western and Eastern European and North American countries are undertaking active radon-risk reduction policies, including the remediation of existing residential and work place building stocks (1). These endeavours include a priority of remediating school buildings. Epidemiological and technical radon research has produced information which has enabled attention to be turned to specific effectiveness and optimisation questions regarding radon identification and remediation programmes in buildings, including schools. Decision making about policy implementation has been an integral part of these programmes and questions have been raised about the economic implications of the regulations and optimisation strategies for workplace action level policy (2,3). (the action level applied to schools is 400 Bq m -3 ). No previous study has estimated the cost-effectiveness of a radon remediation programme for schools using the methodological framework now considered appropriate in the economic evaluation of health interventions. It is imperative that this should be done, in order that the resources required to obtain health gain from radon remediation in schools can be systematically compared with equivalent data for other health interventions and radon remediation programmes. In this study a cost-effectiveness analysis of radon remediation in schools was undertaken, using the best available national data and information from Northamptonshire on the costs and effectiveness of radon identification and remediation in schools, and the costs and health impact of lung cancer cases. A model based on data from Northamptonshire is presented (where 6.3% of residential stock is over 200 Bq m -3 ). The resultant cost-effectiveness ratio was pound 7,550 per life year gained in pound 1997. Results from the

  6. Twenty lectures on thermodynamics

    CERN Document Server

    Buchdahl, H A

    2013-01-01

    Twenty Lectures on Thermodynamics is a course of lectures, parts of which the author has given various times over the last few years. The book gives the readers a bird's eye view of phenomenological and statistical thermodynamics. The book covers many areas in thermodynamics such as states and transition; adiabatic isolation; irreversibility; the first, second, third and Zeroth laws of thermodynamics; entropy and entropy law; the idea of the application of thermodynamics; pseudo-states; the quantum-static al canonical and grand canonical ensembles; and semi-classical gaseous systems. The text

  7. Innovative technology for expedited site remediation of extensive surface and subsurface contamination

    International Nuclear Information System (INIS)

    Audibert, J.M.E.; Lew, L.R.

    1994-01-01

    Large scale surface and subsurface contamination resulted from numerous releases of feed stock, process streams, waste streams, and final product at a major chemical plant. Soil and groundwater was contaminated by numerous compounds including lead, tetraethyl lead, ethylene dibromide, ethylene dichloride, and toluene. The state administrative order dictated that the site be investigated fully, that remedial alternative be evaluated, and that the site be remediated within a year period. Because of the acute toxicity and extreme volatility of tetraethyl lead and other organic compounds present at the site and the short time frame ordered by the regulators, innovative approaches were needed to carry out the remediation while protecting plant workers, remediation workers, and the public

  8. Cavitational Hydrothermal Oxidation: A New Remediation Process - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Suslick, K. S.

    2001-07-05

    During the past year, we have continued to make substantial scientific progress on our understanding of cavitation phenomena in aqueous media and applications of cavitation to remediation processes. Our efforts have focused on three separate areas: sonoluminescence as a probe of conditions created during cavitational collapse in aqueous media, the use of cavitation for remediation of contaminated water, and an addition of the use of ultrasound in the synthesis of novel heterogeneous catalysts for hydrodehalogenation of halocarbons under mild conditions.

  9. Managerial response to stockouts: the effect of remedies on consumer behavior

    Directory of Open Access Journals (Sweden)

    Ester Quirino Dias Sampaio

    2016-03-01

    Full Text Available Abstract Stockouts remain a significant problem for retail firms. Estimates of stockout rates in the past fifty years consistently averaged approximately 8 percent. The consequences of stockouts transcend the retail store to include its supporting supply chain. In addition to the effect on the behavior of consumers, stockouts can impact the firm’s replenishment policy, the level and location of inventories and the cost of emergency shipments required to replenish out-of-stock items. Although there is a substantive literature in logistics that measures the frequency of and the consumer response to stockouts, investigation of the effect of remedies on consumer response is sparse. To address this problem, the effectiveness of five remedies as tools to manage retail stockouts was investigated: apology, raincheck, home delivery, trade-up and discount. A remedy is an incentive to induce consumers to not leave a store in response to a stockout. In addition the influence of consumer characteristics (i.e., brand loyalty and shopping situations (i.e., urgency of purchase on the effect of each remedy on consumer behavior was examined. The results suggest that the remedies are usually effective. The most effective remedy is home delivery. The least effective remedy is a simple apology, which may actually increase the percentage of consumers leaving the store. The results also indicate that the urgency of the purchase and store loyalty have the most impact on remedy effectiveness. These results suggest that there are significant opportunities to use remedies as tools to manage the effect of stockouts on retail stores and their supporting supply chains.

  10. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  11. Muiris O’Sullivan’s “New Storytelling”: The Art of Twenty Years A-Growing

    Directory of Open Access Journals (Sweden)

    Thomas F. Shea

    2018-03-01

    Full Text Available Since its publication in 1933, Muiris O’Sullivan’s Fiche Blian ag Fás (Twenty Years A-Growing has been limited and distorted by critics who view the memoir through a lens shaped by prior assessments of Tomás Ó Criomhthain’s earlier Blasket autobiography, An tOileánach (The Islandman. Muiris Mac Conghail voices the standard perspective when he states, “It was the publication of Tomás Ó Criomhthain’s An tOileánach, in 1929, which both acted as an incentive and provided an exemplar to Muiris” (150. O’Crohan’s autobiography certainly inspired O’Sullivan; however, Muiris’s more literary sensibility set him on his own inscriptive journey during which he creates a new type of narrative, one which creatively interweaves oral traditions with the contours of the novel. As we investigate what Pádraig Ó Fiannachta terms the author’s nua scéalaíocht, or “new storytelling” techniques, we can more fully appreciate O’Sullivan’s subtle dexterities as both traditional storyteller and novelistic craftsman.

  12. Math Course for Liberal Arts Majors: A Pilot with Embedded Remediation

    Directory of Open Access Journals (Sweden)

    Eileen Perez

    2018-01-01

    Full Text Available This study was designed to determine if embedded remediation is significant in accelerating the pathway to completion of a college-level math course for students needing remediation. The project studied the impact on student success in a quantitative literacy course at a Massachusetts four-year state university with remedial material embedded. The course satisfies the university�s general education math requirement for students with liberal arts majors who are not required to complete college algebra or calculus-based courses. The paper begins with a presentation of the issues with remedial mathematics and its impact on students� graduation and persistence. Next, the paper covers the design and implementation of the pilot program. In addition, the placement criteria and the pilot nature of the program are discussed, including attempts at the random assignment of students to regular or embedded-remediation course groups. A discussion of the findings follows including that students succeeded in the course with embedded remediation at 87% compared to 72% for those in the traditional version of the course though the differences are not statistically significant at the sample size. The paper concludes with lessons learned and next steps at this university for further study.

  13. Some Similarities and Differences Between Compositions Written by Remedial and Non-Remedial College Freshmen.

    Science.gov (United States)

    House, Elizabeth B.; House, William J.

    The essays composed by 84 remedial and 77 nonremedial college freshmen were analyzed for some features proposed by Mina Shaughnessy as being characteristic of basic writers. The students were enrolled in either a beginning remedial class (098), a class at the next level of remediation (099), or a regular English class (101). The essays were…

  14. Twenty-five years of life lessons

    NARCIS (Netherlands)

    Smit, Annemieke; Dorren, Luuk; Noord, Van Hans; Veraart, Josja; Cusell, Casper; Sterk, Henk Pieter

    2017-01-01

    For 25 years, Physical Geography students of the University of Amsterdam have experienced a 6-week field training in the cuesta landscape in Luxembourg around Diekirch. They studied the geology of the Gutland and surrounding areas, such as Ardennes and Eiffel. They mapped geomorphological patterns,

  15. Object reasoning for waste remediation

    International Nuclear Information System (INIS)

    Pennock, K.A.; Bohn, S.J.; Franklin, A.L.

    1991-08-01

    A large number of contaminated waste sites across the United States await size remediation efforts. These sites can be physically complex, composed of multiple, possibly interacting, contaminants distributed throughout one or more media. The Remedial Action Assessment System (RAAS) is being designed and developed to support decisions concerning the selection of remediation alternatives. The goal of this system is to broaden the consideration of remediation alternatives, while reducing the time and cost of making these considerations. The Remedial Action Assessment System is a hybrid system, designed and constructed using object-oriented, knowledge- based systems, and structured programming techniques. RAAS uses a combination of quantitative and qualitative reasoning to consider and suggest remediation alternatives. The reasoning process that drives this application is centered around an object-oriented organization of remediation technology information. This paper describes the information structure and organization used to support this reasoning process. In addition, the paper describes the level of detail of the technology related information used in RAAS, discusses required assumptions and procedural implications of these assumptions, and provides rationale for structuring RAAS in this manner. 3 refs., 3 figs

  16. Adapting Advances in Remediation Science to Long-Term Surveillance

    International Nuclear Information System (INIS)

    Peterson, D.M.

    2006-01-01

    Several facets of groundwater remediation stand to gain from the advances made during recent years in disciplines that contribute to remediation science. Engineered remedies designed to aggressively remove subsurface contamination should benefit from this progress, and more passive cleanup methods and the long-term monitoring of such passive approaches may benefit equally well if not more. The U.S. Department of Energy Office of Legacy Management (LM) has adopted a strategic plan that is designed to take advantage of technological improvements in the monitoring and assessment of both active and passive groundwater remedies. Flexible adaptation of new technologies, as they become available, to long-term surveillance at LM sites is expected to reduce site stewardship costs while ensuring the future protection of human health and the environment. Some of the technologies are expected to come from government initiatives that focus on the needs of subsurface monitoring. Additional progress in monitoring science will likely result from continual improvements in our understanding of contaminant fate-and-transport processes in groundwater and the vadose zone. (authors)

  17. Adapting Advances in Remediation Science to Long-Term Surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Dave [S.M. Stoller Corporation

    2006-03-01

    Several facets of groundwater remediation stand to gain from the advances made during recent years in disciplines that contribute to remediation science. Engineered remedies designed to aggressively remove subsurface contamination should benefit from this progress, and more passive cleanup methods and the long-term monitoring of such passive approaches may benefit equally well if not more. The U.S. Department of Energy Office of Legacy Management (LM) has adopted a strategic plan that is designed to take advantage of technological improvements in the monitoring and assessment of both active and passive groundwater remedies. Flexible adaptation of new technologies, as they become available, to long-term surveillance at LM sites is expected to reduce site stewardship costs while ensuring the future protection of human health and the environment. Some of the technologies are expected to come from government initiatives that focus on the needs of subsurface monitoring. Additional progress in monitoring science will likely result from continual improvements in our understanding of contaminant fate-and-transport processes in the groundwater and the vadose zone.

  18. Air-Based Remediation Workshop - Section 8 Air-Based Remediation Technology Selection Logic

    Science.gov (United States)

    Pursuant to the EPA-AIT Implementing Arrangement 7 for Technical Environmental Collaboration, Activity 11 "Remediation of Contaminated Sites," the USEPA Office of International Affairs Organized a Forced Air Remediation Workshop in Taipei to deliver expert training to the Environ...

  19. B. F. Skinner’s legacy twenty years after (1990-2010: Behavior analysis in Ibero-America

    Directory of Open Access Journals (Sweden)

    Wilson M. López López

    2010-01-01

    Full Text Available Twenty years after his death (August 18th 1990,B. F. Skinner leaves five major living legacies: 1radical behaviorism; 2 the experimental analysis ofbehavior; 3 applied behavior analysis; 4 the Skinnerbox; 5 the Horcones community (Mexico.Behavior analysis is recognized for its internationalactive presence. Its growth provides a set of opportunitiesfor knowledge and technology transferenceand reminds us the importance of working for thedevelopment of educational and research programsand the arrangement of contingencies which enableits advance. In Ibero-America, behavior analysis, asa Skinnerian legacy, has been an important traditionwithin psychology. In this article we will presenta current synthesis of the central Ibero-Americancontributions to Behavior analysis. The panoramaof Behavior analysis in Ibero-America will beanalyzed according to the following dimensions:1 the most relevant figures; 2 the academic communityrelated to the Behavior Analytic tradition;and 3 the most important research lines. Finally,some of the most general characteristics of Ibero-American Behavior analysis are included.

  20. 200-UP-1 groundwater remedial design/remedial action work plan. Revision 1

    International Nuclear Information System (INIS)

    1997-07-01

    This 200-UP-1 remedial design report presents the objective and rationale developed for the design and implementation of the selected interim remedial measure for the 200-UP-1 Operable Unit, located in the 200 West Area of the Hanford Site

  1. Genealogy Remediated

    DEFF Research Database (Denmark)

    Marselis, Randi

    2007-01-01

    Genealogical websites are becoming an increasingly popular genre on the Web. This chapter will examine how remediation is used creatively in the construction of family history. While remediation of different kinds of old memory materials is essential in genealogy, digital technology opens new...... possibilities. Genealogists use their private websites to negotiate family identity and hereby create a sense of belonging in an increasingly complex society. Digital technologies enhance the possibilities of coorporation between genealogists. Therefore, the websites are also used to present archival...

  2. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties (VP),'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A)

  3. Review: Devan Pillay, Gilbert M. Khadiagala, Prishani Naidoo and Roger Southall (eds, New South African Review 4: A Fragile Democracy – Twenty Years On (2014

    Directory of Open Access Journals (Sweden)

    Ian Taylor

    2015-01-01

    Full Text Available Review of the edited volume:Devan Pillay, Gilbert M. Khadiagala, Prishani Naidoo and Roger Southall (eds, New South African Review 4: A Fragile Democracy – Twenty Years On, Johannesburg: Wits University Press, 2014, ISBN 9781868147632, 380 pp.

  4. Nigerian herbal remedies and heavy metals:violation of standard recommended guidelines

    Institute of Scientific and Technical Information of China (English)

    Igweze Zelinjo Nkeiruka; Orisakwe Orish Ebere; Obianime Atuboyedia W

    2012-01-01

    Objective: The growing popularity of herbal remedies approved by the National Agency for Food and Drug Administration and Control (NAFDAC), in Nigeria necessitates a critical re-evaluation of the risks associated with their use. Arsenic, cadmium, chromium, cobalt, lead and nickel contents of were analysed to ascertain their compliance with the recommended limits of the World Health Organization, European Union and United States Environmental Protection Agency. Methods:Twenty four different Nigerian herbal remedies (NHR) in two types of pharmaceutical dosage forms - liquid and capsules, were sampled using basket market protocol in the Niger Delta, Nigeria, in December, 2010. The NHR were ashed before digestion using conc aqua regia HCL:HNO3 (3:1) and arsenic, cadmium, chromium, cobalt, lead and nickel were assayed with Atomic Absorbtion Spectrophotometer, AAS 205A. Arsenic, cadmium, chromium, cobalt, lead and nickel contents of were compared with the recommended limits of the World Health Organization (WHO), European Union (EU) and United States Environmental Protection Agency(USEPA). Results: The highest concentrations of the heavy metals were found in the solid dosage forms whereas the lowest concentrations were found in the liquid preparations. Our study shows the percentage violation of the WHO and EU limits for the six metals were arsenic (0%); cadmium (58:3%);chromium (4.16%); cobalt (0%); lead (54.1%) and nickel (54.1%). Conclusions: This study highlights the need for pharmaco-vigillance especially with respect to metalo-toxicity of Nigerian herbal remedies and need for in-depth risk assessment to understand the extent of the problem.

  5. Mold: Cleanup and Remediation

    Science.gov (United States)

    ... National Center for Environmental Health (NCEH) Cleanup and Remediation Recommend on Facebook Tweet Share Compartir On This ... CDC and EPA on mold cleanup, removal and remediation. Cleanup information for you and your family Homeowner’s ...

  6. Fast-track remediation case study: Southern California refined fuel distributor

    International Nuclear Information System (INIS)

    Bubier, T.W.; Felix, P.R.

    1993-01-01

    Successful environmental remediation projects have three requirements in common: (1) an adequate data base that defines the extent and severity of the problem; (2) a detailed understanding of the actual performance of the remediation technologies being considered; and (3) good communication with the regulatory agencies to assure them that the health and safety of the community and workers will not be jeopardized. In a fast-track remediation project, these requirements are key issues in the critical path. The case study involves soil and groundwater remediation of a 16-acre bulk fuel storage and distribution facility. The facility was in operation for approximately 75 years and contained 20 large aboveground tanks with a total capacity in excess of 20 million gallons. Activities at the facility included receipt, storage, and distribution of refined fuel products, such as kerosene, gasoline, diesel, and bunker fuel. A harbor-widening project was undertaken to increase the level of safety for larger ships when passing through the port. Because of the critical need for harbor-widening, the environmental cleanup needed to be completed as quickly as possible. The following steps were taken during the fast-track remediation case study to meet the above-listed requirements: (1) New Data Quality Objectives (DQOs) were identified for the project; (2) Potentially applicable remedial technologies were evaluated and tested; and (3) An agency task force was developed to enhance communication with the regulatory agencies. This paper discusses these steps and presents examples of how each step was implemented during the remediation case study

  7. Remediation of old environmental liabilities in the Nuclear Research Institute Rez plc

    International Nuclear Information System (INIS)

    Svoboda, Karel; Podlaha, Josef

    2011-01-01

    The Nuclear Research Institute Rez plc (NRI) after 55 years of activities in the nuclear field produced some environmental liabilities that shall be remedied. There are three areas of remediation: (1) decommissioning of old obsolete facilities (e.g. decay tanks, RAW treatment technology, special sewage system), (2) processing of RAW from operation and dismantling of nuclear facilities, and (3) elimination of spent fuel from research nuclear reactors operated by the NRI. The goal is to remedy the environmental liabilities and eliminate the potential negative impact on the environment. Remediation of the environmental liabilities started in 2003 and will be finished in 2014. The character of the environmental liabilities is very specific and requires special remediation procedures. Special technologies are being developed with assistance of external subcontractors. The NRI has gained many experiences in the field of RAW management and decommissioning of nuclear facilities and will use its facilities, experienced staff and all relevant data needed for the successful realization of the remediation. The most significant items of environmental liabilities are described in the paper together with information about the history, the current state, the progress, and the future activities in the field of remediation of environmental liabilities in the NRI. (author)

  8. Integrated program management for major nuclear decommissioning and environmental remediation projects - 59068

    International Nuclear Information System (INIS)

    Lehew, John

    2012-01-01

    Document available in abstract form only. Full text of publication follows: CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy's (DOE) contractor responsible for the safe, environmental cleanup of the Hanford Sites Central Plateau, sections of the Columbia River Corridor and the Hanford Reach National Monument. The 586-square-mile Hanford Site is located along the Columbia River in southeastern Washington, U.S.A. A plutonium production complex, housing the largest volume of radioactive and contaminated waste in the nation, with nine nuclear reactors and associated processing facilities, Hanford played a pivotal role in the nation's defense for more than 40 years, beginning in the 1940's with the Manhattan Project. Today, under the direction of the DOE, Hanford is engaged in one of the world's largest environmental cleanup project. The Plateau Remediation Contract is a 10-year project paving the way for closure of the Hanford Site. The site through its location, climate, geology and proximity to the Columbia River in combination with the results of past nuclear operations presents a highly complex environmental remediation challenge. The complexity is not only due to the technical issues associated with decommissioning nuclear facilities, remediating soil contamination sites, dispositioning legacy waste and fuel materials and integrating these with the deep vadose zone and groundwater remediation

  9. Tank waste remediation system baseline tank waste inventory estimates for fiscal year 1995

    International Nuclear Information System (INIS)

    Shelton, L.W.

    1996-01-01

    A set of tank-by-tank waste inventories is derived from historical waste models, flowsheet records, and analytical data to support the Tank Waste Remediation System flowsheet and retrieval sequence studies. Enabling assumptions and methodologies used to develop the inventories are discussed. These provisional inventories conform to previously established baseline inventories and are meant to serve as an interim basis until standardized inventory estimates are made available

  10. Long term performance of different radon remedial methods in Sweden

    CERN Document Server

    Clavensjoe, B

    2002-01-01

    The object of this project was to investigate the long time effectiveness of different radon remedial methods. The ten years project started 1991. From start the investigation comprised of 105 dwellings (91 single-family houses and 14 flats in multi-family buildings). In all of the dwellings remedial measures were carried out in the eighties. Before and immediately after the reduction the local measured the radon concentrations. New measurements of the radon concentrations have been made every third year; in 1991, 1994, 1997 and in 2000. Twelve different radon remedial methods and method combinations were used. The radon sources were building materials as well as sub-soils. In all of the dwellings the radon concentrations were measured by nuclear track films during 3 months (January-March) measurements and in half of them the air change rates by passive tracer gas methods. The results of the 2000 and the 1991 (within brackets) studies showed that the radon concentration was up to 200 Bq/m sup 3 in 54 (54) sin...

  11. Strategy paper. Remedial design/remedial action 100 Area. Revision 1

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1995-07-01

    The purpose of this planning document is to identify and define the approach for remedial design and remedial action (RD/RA) in the 100 Area of the Hanford Site, located in southeastern Washington State. Additionally, this document will support the Hanford Site Environmental Restoration Contract (ERC) team, the US Department of Energy (DOE), and regulatory agencies in identifying and agreeing upon the complete process for expedited cleanup of the 100 Area

  12. Early twenty-first-century droughts during the warmest climate

    Directory of Open Access Journals (Sweden)

    Felix Kogan

    2016-01-01

    Full Text Available The first 13 years of the twenty-first century have begun with a series of widespread, long and intensive droughts around the world. Extreme and severe-to-extreme intensity droughts covered 2%–6% and 7%–16% of the world land, respectively, affecting environment, economies and humans. These droughts reduced agricultural production, leading to food shortages, human health deterioration, poverty, regional disturbances, population migration and death. This feature article is a travelogue of the twenty-first-century global and regional droughts during the warmest years of the past 100 years. These droughts were identified and monitored with the National Oceanic and Atmospheric Administration operational space technology, called vegetation health (VH, which has the longest period of observation and provides good data quality. The VH method was used for assessment of vegetation condition or health, including drought early detection and monitoring. The VH method is based on operational satellites data estimating both land surface greenness (NDVI and thermal conditions. The twenty-first-century droughts in the USA, Russia, Australia and Horn of Africa were intensive, long, covered large areas and caused huge losses in agricultural production, which affected food security and led to food riots in some countries. This research also investigates drought dynamics presenting no definite conclusion about drought intensification or/and expansion during the time of the warmest globe.

  13. Electrodialytic Remediation of Copper Mine Tailings

    DEFF Research Database (Denmark)

    Hansen, H.K.; Rojo, A.; Ottosen, L.M.

    2012-01-01

    This work compares and evaluates sixteen electrodialytic laboratory remediation experiments on copper mine tailings. Different parameters were analysed, such as remediation time, addition of desorbing agents, and the use of pulsed electrical fields.......This work compares and evaluates sixteen electrodialytic laboratory remediation experiments on copper mine tailings. Different parameters were analysed, such as remediation time, addition of desorbing agents, and the use of pulsed electrical fields....

  14. MGP site remediation: Working toward presumptive remedies

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1996-01-01

    Manufactured Gas Plants (MGPs) were prevalent in the United States during the 19th and first half of the 20th centuries. MGPs produced large quantities of waste by-products, which varied depending on the process used to manufacture the gas, but most commonly were tars and polynuclear aromatic hydrocarbons. There are an estimated 3,000 to 5,000 abandoned MGP sites across the United States. Because these sites are not concentrated in one geographic location and at least three different manufacturing processes were used, the waste characteristics are very heterogeneous. The question of site remediation becomes how to implement a cost-effective remediation with the variety of cleanup technologies available for these sites. Because of the significant expenditure required for characterization and cleanup of MGP sites, owners and regulatory agencies are beginning to look at standardizing cleanup technologies for these sites. This paper discusses applicable cleanup technologies and the attitude of state regulatory agencies towards the use of presumptive remedies, which can reduce the amount of characterization and detailed analysis necessary for any particular site. Additionally, this paper outlines the process of screening and evaluating candidate technologies, and the progress being made to match the technology to the site

  15. Site remediation: The naked truth

    International Nuclear Information System (INIS)

    Calloway, J.M.

    1991-01-01

    The objective of any company faced with an environmental site remediation project is to perform the cleanup effectively at the lowest possible cost. Today, there are a variety of techniques being applied in the remediation of sites involving soils and sludges. The most popular include: stabilization, incineration, bioremediation and off-site treatment. Dewatering may also play an integral role in a number of these approaches. Selecting the most cost-effective technique for remediation of soils and sludges can be a formidable undertaking, namely because it is often difficult to quantify certain expenses in advance of the project. In addition to providing general cost guidelines for various aspects of soil and sludge remediation, this paper will show how some significant cost factors can be affected by conditions related to specific remediation projects and the cleanup technology being applied

  16. Remediation using trace element humate surfactant

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Catherine Lynn; Taylor, Steven Cheney; Bruhn, Debra Fox

    2016-08-30

    A method of remediation at a remediation site having one or more undesirable conditions in which one or more soil characteristics, preferably soil pH and/or elemental concentrations, are measured at a remediation site. A trace element humate surfactant composition is prepared comprising a humate solution, element solution and at least one surfactant. The prepared trace element humate surfactant composition is then dispensed onto the remediation site whereby the trace element humate surfactant composition will reduce the amount of undesirable compounds by promoting growth of native species activity. By promoting native species activity, remediation occurs quickly and environmental impact is minimal.

  17. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  18. Cavitational Hydrothermal Oxidation: A New Remediation Process - Final Report; FINAL

    International Nuclear Information System (INIS)

    Suslick, K. S.

    2001-01-01

    During the past year, we have continued to make substantial scientific progress on our understanding of cavitation phenomena in aqueous media and applications of cavitation to remediation processes. Our efforts have focused on three separate areas: sonoluminescence as a probe of conditions created during cavitational collapse in aqueous media, the use of cavitation for remediation of contaminated water, and an addition of the use of ultrasound in the synthesis of novel heterogeneous catalysts for hydrodehalogenation of halocarbons under mild conditions

  19. Working together: financing the remediation and redevelopment of contaminated properties

    International Nuclear Information System (INIS)

    Ward, E.H.

    1999-01-01

    Local governments and lenders need to work together to encourage and facilitate remediation, redevelopment and full utilization of 'brownfield' sites. Over the past few years in the United States, there has been a trend to develop risk-based clean-up standards and voluntary clean-up programmes that encourage reuse of such sites. Newly available liability protection offered by local governments and private insurers has encouraged this trend. Methods of financing the remediation and redevelopment of contaminated properties are considered in this article. (author)

  20. Thermal soil remediation

    International Nuclear Information System (INIS)

    Nelson, D.

    1999-01-01

    The environmental properties and business aspects of thermal soil remediation are described. Thermal soil remediation is considered as being the best option in cleaning contaminated soil for reuse. The thermal desorption process can remove hydrocarbons such as gasoline, kerosene and crude oil, from contaminated soil. Nelson Environmental Remediation (NER) Ltd. uses a mobile thermal desorption unit (TDU) with high temperature capabilities. NER has successfully applied the technology to target heavy end hydrocarbon removal from Alberta's gumbo clay in all seasons. The TDU consist of a feed system, a counter flow rotary drum kiln, a baghouse particulate removal system, and a secondary combustion chamber known as an afterburner. The technology has proven to be cost effective and more efficient than bioremediation and landfarming

  1. Bioassay responses and effects on benthos after pilot remediations in the delta of the rivers Rhine and Meuse

    NARCIS (Netherlands)

    Besten, den P.J.; Brink, van den P.J.

    2005-01-01

    Chemical and biological monitoring was carried out for 5 years following pilot remediations at two locations in the Rhine-Meuse delta. The remediations consisted of partial excavation of the contaminated sediments, followed by applying a clean layer of sandy material on top. After the remediation, a

  2. Twenty-year trends in the prevalence of Down syndrome and other trisomies in Europe

    DEFF Research Database (Denmark)

    Loane, Maria; Morris, Joan K; Addor, Marie-Claude

    2013-01-01

    This study examines trends and geographical differences in total and live birth prevalence of trisomies 21, 18 and 13 with regard to increasing maternal age and prenatal diagnosis in Europe. Twenty-one population-based EUROCAT registries covering 6.1 million births between 1990 and 2009 participa...

  3. Progress report on the Grand Junction uranium mill tailings remedial action program

    International Nuclear Information System (INIS)

    1979-02-01

    The report provides a history of the program, an analysis of the current status of the program, problems encountered and measures being taken to solve them, and a forecast of future effort required. From the start of remedial efforts in 1973 through September 30, 1978, remedial action has been done on 325 individual structures, including 289 private residences, 14 schools, and 22 commercial business/church locations. As recently as one year ago, the total number of structures requiring remedial action was estimated to be about 600. However, continuing measurements of radon daughter concentrations in structures which previously showed only slightly elevated gamma radiation have resulted in identificaion of additional structures exceeding the Surgeon General's guidelines for radon daughters. Because radon daughter concentrations in structures are highly variable depending on the season of the year and the level of activity, annual averages are used for determining eligibility under the guidelines. Based on this recent experience the estimate of the total number of structures which will eventually qualify for remedial action has been increased from 600 to 800, and the estimated total program cost has been increased from $12,670,000 to $16,960,000. It must be emphasized that these estimates are based only on experience ratios of past measurements and are highly uncertain. It is not expected that further funding, if necessary, will be required before fiscal year 1982

  4. Health effects following long-term exposure to thorium dusts: a twenty-year follow-up study in China

    International Nuclear Information System (INIS)

    Chen, X.A.; Cheng, Y.E.; Xiao, H.; Chen, L.; Yang, Y.J.; Dong, Z.H.; Zheng, R.; Feng, G.; Deng, Y.H.; Feng, Z.L.; Han, X.M.

    2004-01-01

    A twenty-year follow-up study was carried out at Baiyun Obo Rare-earth Iron Mine in China, This mine has been mined since 1958. Its ore contains 0.04% of ThO 2 and 10% of SiO 2 . The purpose of this study is to investigate possible health effects in dust-exposed miners following long-term exposure to thorium-containing dusts and thoron progeny. By using the negative high voltage exhaled thoron progeny measurement system to estimate the miner's thorium lung burden. The highest thorium lung burden among 1 158 measurements of 638 miners was 11.11 Bq. The incidence of stage 0 + pneumoconiosis was increased among dust-exposed miners. An epidemiological study showed that the lung cancer mortality of the dust-exposed miners was significantly (p 2 and SiO 2 ) and thoron progeny. This is the first evidence in humans of the carcinogenicity after long-term inhalation of thorium-containing dusts and thoron progeny. The total person-years of observation for the dust-exposed miners and the controls were 62 712 and 34 672 respectively. (author)

  5. IAEA Remediation Mission Issues Final Report

    International Nuclear Information System (INIS)

    2011-01-01

    organized an International Fact Finding Expert Mission of the Fukushima Daiichi Nuclear Power Plant Accident Following the Great East Japan Earthquake and Tsunami, which took place between 24 May and 2 June 2011. (See Fact- Finding Mission Updates, 22 May - 1 June 2011). The environmental remediation mission of 7 - 15 October was a follow-up to the fact-finding mission held earlier in the year and an essential component of the IAEA's Nuclear Safety Action Plan, approved by the IAEA Board of Governors on 13 September and endorsed by all 151 Member States at the recent IAEA General Conference in September 2011. The Action Plan defines a programme of work to strengthen the global nuclear safety framework. (IAEA)

  6. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  7. Acetylcholinesterase inhibitory activity of Thai traditional nootropic remedy and its herbal ingredients.

    Science.gov (United States)

    Tappayuthpijarn, Pimolvan; Itharat, Arunporn; Makchuchit, Sunita

    2011-12-01

    The incidence of Alzheimer disease (AD) is increasing every year in accordance with the increasing of elderly population and could pose significant health problems in the future. The use of medicinal plants as an alternative prevention or even for a possible treatment of the AD is, therefore, becoming an interesting research issue. Acetylcholinesterase (AChE) inhibitors are well-known drugs commonly used in the treatment of AD. The aim of the present study was to screen for AChE inhibitory activity of the Thai traditional nootropic recipe and its herbal ingredients. The results showed that ethanolic extracts of four out of twenty-five herbs i.e. Stephania pierrei Diels. Kaempfera parviflora Wall. ex Baker, Stephania venosa (Blume) Spreng, Piper nigrum L at 0.1 mg/mL showed % AChE inhibition of 89, 64, 59, 50; the IC50 were 6, 21, 29, 30 microg/mL respectively. The other herbs as well as combination of the whole recipe had no synergistic inhibitory effect on AChE activity. However some plants revealed antioxidant activity. More research should have be performed on this local wisdom remedy to verify the uses in scientific term.

  8. Assessing sustainable remediation frameworks using sustainability principles.

    Science.gov (United States)

    Ridsdale, D Reanne; Noble, Bram F

    2016-12-15

    The remediation industry has grown exponentially in recent decades. International organizations of practitioners and remediation experts have developed several frameworks for integrating sustainability into remediation projects; however, there has been limited attention to how sustainability is approached and operationalized in sustainable remediation frameworks and practices - or whether sustainability plays any meaningful role at all in sustainable remediation. This paper examines how sustainability is represented in remediation frameworks and the guidance provided for practical application. Seven broad sustainability principles and review criteria are proposed and applied to a sample of six international remediation frameworks. Not all review criteria were equally satisfied and none of the frameworks fully met all criteria; however, the best performing frameworks were those identified as sustainability remediation frameworks. Intra-generational equity was addressed by all frameworks. Integrating social, economic and biophysical components beyond triple-bottom-line indicators was explicitly addressed only by the sustainable remediation frameworks. No frameworks provided principle- or rule-based guidance for dealing with trade-offs in sustainability decisions. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. Risk-based remediation: Approach and application

    International Nuclear Information System (INIS)

    Frishmuth, R.A.; Benson, L.A.

    1995-01-01

    The principle objective of remedial actions is to protect human health and the environment. Risk assessments are the only defensible tools available to demonstrate to the regulatory community and public that this objective can be achieved. Understanding the actual risks posed by site-related contamination is crucial to designing cost-effective remedial strategies. All to often remedial actions are overdesigned, resulting in little to no increase in risk reduction while increasing project cost. Risk-based remedial actions have recently been embraced by federal and state regulators, industry, government, the scientific community, and the public as a mechanism to implement rapid and cost-effective remedial actions. Emphasizing risk reduction, rather than adherence to ambiguous and generic standards, ensures that only remedial actions required to protect human health and the environment at a particular site are implemented. Two sites are presented as case studies on how risk-based approaches are being used to remediate two petroleum hydrocarbon contaminated sites. The sites are located at two US Air Force Bases, Wurtsmith Air Force Base (AFB) in Oscoda, Michigan and Malmstrom AFB in Great Falls, Montana

  10. Cost considerations in remediation and disposal

    International Nuclear Information System (INIS)

    Dance, J.T.; Huddleston, R.D.

    1999-01-01

    Opportunities for assessing the costs associated with the reclamation and remediation of sites contaminated by oilfield wastes are discussed. The savings can be maximized by paying close attention to five different aspects of the overall site remediation and disposal process. These are: (1) highly focused site assessment, (2) cost control of treatment and disposal options, (3) value added cost benefits, (4) opportunities to control outside influences during the remedial process, and (5) opportunities for managing long-term liabilities and residual risk remaining after the remedial program is completed. It is claimed that addressing these aspects of the process will ultimately lower the overall cost of site remediation and waste disposal

  11. Assessment of international remedial technologies for application to Superfund sites

    International Nuclear Information System (INIS)

    Sanning, D.E.

    1990-01-01

    This paper presents some of the logical arguments for conducting research on remedial technologies for contaminated land and groundwater at an international level. It gives information on many of the international organizations that are involved in environmental programs, but it especially gives emphasis to the NATO-CCMS pilot study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater. The purpose of the study is to field demonstrate and evaluate new/innovative technologies for remedial action at uncontrolled hazardous waste sites. This study is a logical international extension of the US EPA SITE program. It offers the opportunity to obtain a multiple data base on various remedial action unit processes without any single country having to commit a disproportionate amount of its internal resources to any specific activity. Each participating country provides the necessary resources for those demonstrations which they are contributing to the study. Sites are selected by a majority vote of all participating countries (no country is permitted to vote for its own sites). The study is a 5 year program with participants from Canada, Denmark, Federal Republic of Germany, France, Greece, Italy, Japan, the Netherlands, Norway, Spain, and the US. The need for cost-effective remedial action technologies for hazardous waste sites is a problem of all industrialized countries. The need to build a knowledge base of emerging remedial technologies was the impetus behind the USEPA's lead role and commitment to this pilot study

  12. CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY

    Energy Technology Data Exchange (ETDEWEB)

    BERGMAN, T. B.; STEFANSKI, L. D.; SEELEY, P. N.; ZINSLI, L. C.; CUSACK, L. J.

    2012-09-19

    THE CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY WAS CONDUCTED TO DEVELOP AN OPTIMAL SEQUENCE OF REMEDIATION ACTIVITIES IMPLEMENTING THE CERCLA DECISION ON THE CENTRAL PLATEAU. THE STUDY DEFINES A SEQUENCE OF ACTIVITIES THAT RESULT IN AN EFFECTIVE USE OF RESOURCES FROM A STRATEGIC PERSPECTIVE WHEN CONSIDERING EQUIPMENT PROCUREMENT AND STAGING, WORKFORCE MOBILIZATION/DEMOBILIZATION, WORKFORCE LEVELING, WORKFORCE SKILL-MIX, AND OTHER REMEDIATION/DISPOSITION PROJECT EXECUTION PARAMETERS.

  13. [Cognitive remediation and nursing care].

    Science.gov (United States)

    Schenin-King, Palmyre; Thomas, Fanny; Braha-Zeitoun, Sonia; Bouaziz, Noomane; Januel, Dominique

    2016-01-01

    Therapies based on cognitive remediation integrate psychiatric care. Cognitive remediation helps to ease cognitive disorders and enable patients to improve their day-to-day lives. It is essential to complete nurses' training in this field. This article presents the example of a patient with schizophrenia who followed the Cognitive Remediation Therapy programme, enabling him to access mainstream employment. Copyright © 2016 Elsevier Masson SAS. All rights reserved.

  14. World-first PRB remediation system

    International Nuclear Information System (INIS)

    Mundle, Keely

    2013-01-01

    degrading directly to ethane, ethenes and acetylene, thereby avoiding the production of other compounds which can be more toxic than the initial chemical. The installation of a ZVI PRB was identified as the prime candidate technology for the remediation of groundwater at the waste control site. The recommendation was based on site conditions such as geology, hydrogeology and accessibility. After further investigation it was identified that nitrate concentrations in the groundwater could result in passivation of the ZVI, which would have compromised the performance of the ZVI barrier. Research has found that nitrate can passivate ZVI and inhibit remedial performance by causing a thin layer of iron oxides to coat the iron. Based on laboratory experiments undertaken by Golder Associates in 2009 and earlier overseas studies, it was concluded that an upgradient PRB containing a mixture of sawdust and sand could efficiently remove the nitrates prior to the ZVI PRB. The upgradient PRB would be installed parallel to the ZVI PRB, which would largely eliminate the problem of nitrate passivation of the barrier. Subsequently, Golder designed and installed the first dual passive barrier system in Australia at the waste control site which, due to its sequential nature, also made it the only one of its kind in the world. The PRBs are 76m long by 10m deep. The system was installed in May 2010 and quarterly groundwater monitoring of the system has been undertaken over the past two years. Results have indicated that the sawdust PRB has been effective in removing more than 99% of the nitrates in groundwater and the ZVI PRB is reducing the concentration of TCE by 99%. Overall, the reduction in the mass of chlorinated ethenes by the remedial system in its second year of operation has averaged 79%, a major improvement on the first year average of 52%. The benefit of designing and installing this type of barrier is it requires no ongoing operation of pumps or any other equipment that might be

  15. Plant-based remediation processes

    Energy Technology Data Exchange (ETDEWEB)

    Gupta, Dharmendra Kumar (ed.) [Belgian Nuclear Research Centre (SCK.CEN), Mol (Belgium). Radiological Impact and Performance Assessment Division

    2013-11-01

    A valuable source of information for scientists in the field of environmental pollution and remediation. Describes the latest biotechnological methods for the treatment of contaminated soils. Includes case studies and protocols. Phytoremediation is an emerging technology that employs higher plants for the clean-up of contaminated environments. Basic and applied research have unequivocally demonstrated that selected plant species possess the genetic potential to accumulate, degrade, metabolize and immobilize a wide range of contaminants. The main focus of this volume is on the recent advances of technologies using green plants for remediation of various metals and metalloids. Topics include biomonitoring of heavy metal pollution, amendments of higher uptake of toxic metals, transport of heavy metals in plants, and toxicity mechanisms. Further chapters discuss agro-technological methods for minimizing pollution while improving soil quality, transgenic approaches to heavy metal remediation and present protocols for metal remediation via in vitro root cultures.

  16. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  17. Green Remediation Best Management Practices: Implementing In Situ Thermal Technologies

    Science.gov (United States)

    Over recent years, the use of in situ thermal technologies such as electrical resistance heating, thermal conductive heating, and steam enhanced extraction to remediate contaminated sites has notably increased.

  18. Digital earth applications in the twenty-first century

    NARCIS (Netherlands)

    de By, R.A.; Georgiadou, P.Y.

    2014-01-01

    In these early years of the twenty-first century, we must look at how the truly cross-cutting information technology supports other innovations, and how it will fundamentally change the information positions of government, private sector and the scientific domain as well as the citizen. In those

  19. Uranium Mill Tailings Remedial Action Program. Annual status report

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-01

    The purpose, scope, history, requirements, and management organization of the UMTRA Program are summarized in the Introduction. The remainder of the report describes progress made during the past year (F 1980) and discusses future plants and activities. Early emphasis has been on the four highest-priority sites because of their proximity to population centers. These sites are: (1) Canonsburg, Pennsylvania; (2) Salt Lake City, Utah; (3) Durango, Colorado; and (4) Shiprock, New Mexico (Navajo Reservation). To date, twenty-five vicinity properties near the Canonsburg site and two such properties near the Salt Lake City site have been designated for remedial action. A research effort was undertaken at a major vicinity property, the Mountain States Supply Company in Salt Lake City, to study the effects of heating-and-ventilating-system modification on indoor radon-daughter concentrations. A cooperative agreement was executed between DOE and the Commonwealth of Pennsylvania. A similar agreement with the State of Utah is expected to be executed in early FY 1981. Further, it is expected that additional cooperative agreements will be negotiated during FY 1981 with the States of Colorado and Wyoming and the Navajo Nation. It is expected that the processing site at Canonsburg, PA (the Canonsburg Industrial Park) will be acquired during FY 1981. Draft Environmental Impact Statements for the four highest-priority sites will be completed during FY 1981.

  20. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1980-12-01

    The purpose, scope, history, requirements, and management organization of the UMTRA Program are summarized in the Introduction. The remainder of the report describes progress made during the past year (F 1980) and discusses future plants and activities. Early emphasis has been on the four highest-priority sites because of their proximity to population centers. These sites are: (1) Canonsburg, Pennsylvania; (2) Salt Lake City, Utah; (3) Durango, Colorado; and (4) Shiprock, New Mexico (Navajo Reservation). To date, twenty-five vicinity properties near the Canonsburg site and two such properties near the Salt Lake City site have been designated for remedial action. A research effort was undertaken at a major vicinity property, the Mountain States Supply Company in Salt Lake City, to study the effects of heating-and-ventilating-system modification on indoor radon-daughter concentrations. A cooperative agreement was executed between DOE and the Commonwealth of Pennsylvania. A similar agreement with the State of Utah is expected to be executed in early FY 1981. Further, it is expected that additional cooperative agreements will be negotiated during FY 1981 with the States of Colorado and Wyoming and the Navajo Nation. It is expected that the processing site at Canonsburg, PA (the Canonsburg Industrial Park) will be acquired during FY 1981. Draft Environmental Impact Statements for the four highest-priority sites will be completed during FY 1981

  1. Acid rock drainage passive remediation using alkaline clay: Hydro-geochemical study and impacts of vegetation and sand on remediation.

    Science.gov (United States)

    Plaza, Fernando; Wen, Yipei; Liang, Xu

    2018-10-01

    Acid rock drainage (ARD) is one of the most adverse environmental problems of the mine industry, especially in regions with an abundance of coal refuse (CR) deposits (e.g. the Northern Appalachian Coalfield in the USA) where surface and ground waters are affected by this pollution due to the acidity and high content of sulfates and heavy metals. This study explores the effectiveness of the ARD passive remediation method using alkaline clay (AC) through a series of static and long-term kinetic laboratory experiments (over three years) complemented with field measurements and geochemical modeling. Two important issues associated with this passive and auto-sustainable ARD remediation method were investigated: 1) the hydrogeochemical study of the mixture in terms of the percentages of AC and CR, and, 2) impacts of vegetation cover and a saturated sand barrier on the remediation. Both the field measurements and the samples used for the experiments came from a local coal waste site. Through the analysis of the field measurements and the outcome of the laboratory experiments and the geochemical modeling, alkaline clay proved to be an effective remediation material for ARD, in terms of achieving a neutral pH in the leachate and immobilization of sulfate and metals such as Fe, Mn, Cu, Zn, Ni, Pb, Cd, Co. Moreover, it has been demonstrated that the use of vegetation and a saturated sand barrier are beneficial. Vegetation acted as a phytoaccumulation/phytoextraction agent, causing an additional immobilization of metals. The saturated sand barrier blocked downward the oxygen and water diffusion, reducing pyrite oxidation rates. The proposed remediation approach ensures that the acidity consumption will likely occur before all the alkalinity is exhausted. Copyright © 2018 Elsevier B.V. All rights reserved.

  2. Twenty-five years of modeling multiphase flow and heat transfer

    International Nuclear Information System (INIS)

    Lyczkowski, R.W.

    1999-01-01

    This presentation will cover some of the highlights of multiphase modeling in collaboration with Professor Dimitri Gidaspow (DG) over the last roughly twenty-five years. It all started in 1972 in Idaho Falls with Charles Solbrig, who planned and initiated a project for the former USAEC to develop a computer code to replace RELAP4 to analyze the loss of coolant accident (LOCA). DG spent his sabbatical on the project in 1973. One highlight was the discovery of complex characteristics, the implications of which are still pondered by some. Fluidization research began in 1978 when the author collaboratively developed a step-by-step building-block approach to understanding the hydrodynamics of fluidized beds, an approach closely coupled to validation experiments. A grant from the USDOE to study solids circulation around a jet in a fluidized bed was awarded to DG in 1978. Following that, grants from GRI, NSF, and a contract from Westinghouse Electric Corp. allowed the early work to continue. Progress was slow since computer costs were high. Subsequent continuing support from the USDOE, NSF, EPRI, and industry has allowed research to continue, as has his collaboration. A highlight of this collaboration was the development of the monolayer energy dissipation (MED) erosion model. Multiphase flow and fluidization theory took quantum leaps with the publication of DG's Multiphase Flow and Fluidization: Continuum and Kinetic Theory Descriptions (MFF), Academic Press, San Diego (1994), for which there is essentially no competition. Only the late Professor S.L. Soo's Particulates and Continuum: Multiphase Fluid Dynamics, Hemisphere Publishing Corp., New York (1989), a textbook version of the classic monograph Multiphase Fluid Dynamics, Science Press, Beijing, China (1990), comes close. In MFF, the kinetic theory of granular flow has evolved as a potentially viable adjunct to the continuum multiphase theory, of which fluidization is one important manifestation. It must be

  3. DOE'S remedial action assurance program

    International Nuclear Information System (INIS)

    Welty, C.G. Jr.; Needels, T.S.; Denham, D.H.

    1984-10-01

    The formulation and initial implementation of DOE's Assurance Program for Remedial Action are described. It was initiated in FY 84 and is expected to be further implemented in FY 85 as the activities of DOE's Remedial Action programs continue to expand. Further APRA implementation will include additional document reviews, site inspections, and program office appraisals with emphasis on Uranium Mill Tailings Remedial Action Program and Surplus Facilities Management Program

  4. Demonstration of risk-based decision analysis in remedial alternative selection and design

    International Nuclear Information System (INIS)

    Evans, E.K.; Duffield, G.M.; Massmann, J.W.; Freeze, R.A.; Stephenson, D.E.

    1993-01-01

    This study demonstrates the use of risk-based decision analysis (Massmann and Freeze 1987a, 1987b) in the selection and design of an engineering alternative for groundwater remediation at a waste site at the Savannah River Site, a US Department of Energy facility in South Carolina. The investigation focuses on the remediation and closure of the H-Area Seepage Basins, an inactive disposal site that formerly received effluent water from a nearby production facility. A previous study by Duffield et al. (1992), which used risk-based decision analysis to screen a number of ground-water remediation alternatives under consideration for this site, indicated that the most attractive remedial option is ground-water extraction by wells coupled with surface water discharge of treated effluent. The aim of the present study is to demonstrate the iterative use of risk-based decision analysis throughout the design of a particular remedial alternative. In this study, we consider the interaction between two episodes of aquifer testing over a 6-year period and the refinement of a remedial extraction well system design. Using a three-dimensional ground-water flow model, this study employs (1) geostatistics and Monte Carlo techniques to simulate hydraulic conductivity as a stochastic process and (2) Bayesian updating and conditional simulation to investigate multiple phases of aquifer testing. In our evaluation of a remedial alternative, we compute probabilistic costs associated with the failure of an alternative to completely capture a simulated contaminant plume. The results of this study demonstrate the utility of risk-based decision analysis as a tool for improving the design of a remedial alternative through the course of phased data collection at a remedial site

  5. Twenty years of operation of the Radioisotope Department of the 3rd Medical Clinic, Faculty of General Medicine, Charles University in Prague

    International Nuclear Information System (INIS)

    Kapitola, J.

    1983-01-01

    Twenty years ago a radioisotope department was established in the old building of the 3rd Medical Clinic in Prague 2. The department is suitably placed and meets present requirements. It was set up as part of the 3rd Medical Clinic and of the Laboratory for endocrinology and Metabolism which gave it its main orientation and scope. Its present scope is much broader. In the twenty years since it was established 115,800 examinations were carried out, some 40 examination methods were introduced, 103 publications published, members of the department were co-authors of another 113 publications, they completed 11 research projects. The production of the department represents a substantial part of laboratory material especially in the diagnosis of endocrinopathy and metabolic disorders at the Clinic and is a significant part of the material of a number of research projects. The department has significantly contributed to the development of nuclear medicine in the Czechoslovak Socialist Republic in thyroid diagnosis, by the first introduction of radioimmunoassay methods, by the introduction of certain other special examination and laboratory methods and is currently taking part in the fulfilment of tasks given by the zoning of nuclear medicine in health care in Czechoslovakia in general and in Prague in particular. (author)

  6. 46 CFR 298.41 - Remedies after default.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Remedies after default. 298.41 Section 298.41 Shipping... Defaults and Remedies, Reporting Requirements, Applicability of Regulations § 298.41 Remedies after default... governing remedies after a default, which relate to our rights and duties, the rights and duties of the...

  7. Risk characterization and remedial management of TPH-affected soils

    International Nuclear Information System (INIS)

    Smith, J.; Von Burg, R.; Preslo, L.; Lakin, M.

    1994-01-01

    A risk-based remedial program for petroleum hydrocarbon affected soils has been implemented at a large land parcel in California. The site is the former location of a manufacturing facility that had been in operation since the 1940s. As a result of various activities related to parts manufacturing, several large areas of soil were found to contain various petroleum products. The primary sources of petroleum hydrocarbons included cutting oils, lubricating oils, fuels, and hydraulic oils associated with the site operations. Concentrations of total petroleum hydrocarbons (TPH) as high as 100,000 mg/kg were identified in soil. These high concentrations of TPH were identified at depths up to 60 feet below ground surface (bgs), with the vadose zone extending to depths of more than 150 feet bgs. Within California, traditional cleanup levels for TPH-affected soils typically range from 100 to 1,000 mg/kg. Because of the client's desire to sell the property for rapid development, the remedial alternative of excavation and off-haul was deemed too time consuming and costly. The estimated costs associated with this remediation which potentially involved soil removal to 100--120 feet exceeded $20 million and could take up to one year to complete. To meet the schedule requirements for site remediations as well as significantly reduce the overall project cost, the authors undertook a risk-based approach to assess if remediation of the TPH-affected soils was required

  8. Experimental and Numerical Investigations of Soil Desiccation for Vadose Zone Remediation: Report for Fiscal Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ward, Andy L.; Oostrom, Mart; Bacon, Diana H.

    2008-02-04

    Apart from source excavation, the options available for the remediation of vadose zone metal and radionuclide contaminants beyond the practical excavation depth (0 to 15 m) are quite limited. Of the available technologies, very few are applicable to the deep vadose zone with the top-ranked candidate being soil desiccation. An expert panel review of the work on infiltration control and supplemental technologies identified a number of knowledge gaps that would need to be overcome before soil desiccation could be deployed. The report documents some of the research conducted in the last year to fill these knowledge gaps. This work included 1) performing intermediate-scale laboratory flow cell experiments to demonstrate the desiccation process, 2) implementing a scalable version of Subsurface Transport Over Multiple Phases–Water-Air-Energy (STOMP-WAE), and 3) performing numerical experiments to identify the factors controlling the performance of a desiccation system.

  9. The role of innovative remediation technologies

    International Nuclear Information System (INIS)

    Doesburg, J.M.

    1992-05-01

    There are currently over 1200 sites on the US Superfund's National Priorities List (NPL) of hazardous waste sites, and there are over 30, 000 sites listed by the Comprehensive Environmental Responsibility, Compensation and Liability Information System (CERCLIS). The traditional approach to remediating sites in the US has been to remove the material and place it in a secure landfill, or in the case of groundwater, pump and treat the effluent. These technologies have proven to be very expensive and don't really fix the problem. The waste is just moved from one place to another. In recent years, however, alternative and innovative technologies have been increasingly used in the US to replace the traditional approaches. This paper will focus on just such innovative remediation technologies in the US, looking at the regulatory drivers, the emerging technologies, some of the problems in deploying technologies, and a case study

  10. Commercial NAA — Is It a Success? Evaluation of a Twenty Year Experiment

    International Nuclear Information System (INIS)

    Parry, S.

    2013-01-01

    The commercial service at Imperial College was maintained for twenty years by juggling staff, equipment and irradiation facilities, building when required and downsizing when necessary. At no point was the service entirely self-sufficient since staff had more than one role and participated in teaching and research as well as the analytical service. The balance was of benefit everyone concerned, including students who have studied with us and gained experience of working within a well maintained and quality assured laboratory. The benefits of collaborating with industry cannot be overestimated, with the secondary effects for research and teaching identified previously. A key change took place in the early 2000s, which can be seen in Figure 5 by the fall in income from 2002. The author’s academic department became a separate cost centre to the Reactor Centre, and irradiations were charged at a more realistic price. Once the true costs were built in, including space, overheads and irradiation charges, it was not possible to maintain a viable business plan without reducing staff to a non-viable number. As a result, in 2003 the analytical service was handed to the Reactor Centre, in which the business could remain viable because the irradiation charge became income not expenditure. Without the continued interactions that academic research generated, the NAA service has diminished with very few customers in the past few years. Staff are occupied with internal work for the reactor such as routine monitoring using gamma spectrometry. In summary the introduction and operation of a commercial service is to be recommended, particularly in those situations where it can complement other parts of the organisation such other analytical or academic activities. It is not practical to fund reactor operations entirely on commercial activities, but it can result in a number of spin-offs that can increase other income streams such as teaching and research projects. Over the past 28

  11. 32 CFR 310.47 - Civil remedies.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  12. Environmental remediation for the upstream of Yotsugi Mill Tailings Pond, Ningyo-toge Uranium Mine

    International Nuclear Information System (INIS)

    Saito, Hiroshi; Torikai, Kazuyoshi; Fukushima, Shigeru; Sakao, Ryota; Taki, Tomihiro; Sato, Yasushi; Sakamoto, Atsushi

    2016-03-01

    Ningyo-toge Environmental Engineering Center has been conducting environmental remediation of the Ningyo-toge Uranium Mine, after decades of mine-related activities including uranium exploration, mining and test milling were terminated. The main purposes of the remediation are to take measures to ensure safety and radiation protection from the exposure pathways to humans in future, and to prevent the occurrence of mining pollution. As part of the remediation, upstream part of the Yotsugi Mill Tailings Pond, the highest prioritized facility among all of the mine-related facilities, has been remediated to fiscal year 2012. In the remediation, multi-layered capping has been constructed using natural material on ground surface, after specifications and whole remediation procedure being examined in terms of long-term stability, radiation protection, economics, and other aspects. Monitoring has been carried out to confirm the effectiveness of the capping, in terms of settlement, underground temperature, dose-rate and radon exhalation rate. Monitoring of drainage volume of penetrated rainwater is planned to begin in future. Accumulated data will be examined and its result will be used for remediation of downstream part of the Pond. (author)

  13. LCA of Soil and Groundwater Remediation

    DEFF Research Database (Denmark)

    Søndergaard, Gitte Lemming; Owsianiak, Mikolaj

    2018-01-01

    Today, there is increasing interest in applying LCA to support decision-makers in contaminated site management. In this chapter, we introduce remediation technologies and associated environmental impacts, present an overview of literature findings on LCA applied to remediation technologies...... and present methodological issues to consider when conducting LCAs within the area. Within the field of contaminated site remediation , a terminology distinguishing three types of environmental impacts: primary, secondary and tertiary, is often applied. Primary impacts are the site-related impacts due...... and efficiency of remediation, which are important for assessment or primary impacts; (ii) robust assessment of primary impacts using site-specific fate and exposure models; (iii) weighting of primary and secondary (or tertiary) impacts to evaluate trade-offs between life cycle impacts from remediation...

  14. Policy and Strategies for Environmental Remediation

    International Nuclear Information System (INIS)

    2015-01-01

    In the environmental remediation of a given site, concerned and interested parties have diverse and often conflicting interests with regard to remediation goals, the time frames involved, reuse of the site, the efforts necessary and cost allocation. An environmental remediation policy is essential for establishing the core values on which remediation is to be based. It incorporates a set of principles to ensure the safe and efficient management of remediation situations. Policy is mainly established by the national government and may become codified in the national legislative system. An environmental remediation strategy sets out the means for satisfying the principles and requirements of the national policy. It is normally established by the relevant remediation implementer or by the government in the case of legacy sites. Thus, the national policy may be elaborated in several different strategies. To ensure the safe, technically optimal and cost effective management of remediation situations, countries are advised to formulate an appropriate policy and strategies. Situations involving remediation include remediation of legacy sites (sites where past activities were not stringently regulated or adequately supervised), remediation after emergencies (nuclear and radiological) and remediation after planned ongoing operation and decommissioning. The environmental policy involves the principles of justification, optimization of protection, protection of future generations and the environment, efficiency in the use of resources, and transparent interaction with stakeholders. A typical policy will also take into account the national legal framework and institutional structure and applicable international conventions while providing for the allocation of responsibilities and resources, in addition to safety and security objectives and public information and participation in the decision making process. The strategy reflects and elaborates the goals and requirements set

  15. Evaluation of select trade-offs between ground-water remediation and waste minimization for petroleum refining industry

    International Nuclear Information System (INIS)

    Andrews, C.D.; McTernan, W.F.; Willett, K.K.

    1996-01-01

    An investigation comparing environmental remediation alternatives and attendant costs for a hypothetical refinery site located in the Arkansas River alluvium was completed. Transport from the land's surface to and through the ground water of three spill sizes was simulated, representing a base case and two possible levels of waste minimization. Remediation costs were calculated for five alternative remediation options, for three possible regulatory levels and alternative site locations, for four levels of technology improvement, and for eight different years. It is appropriate from environmental and economic perspectives to initiate significant efforts and expenditures that are necessary to minimize the amount and type of waste produced and disposed during refinery operations; or conversely, given expected improvements in technology, is it better to wait until remediation technologies improve, allowing greater environmental compliance at lower costs? The present work used deterministic models to track a light nonaqueous phase liquid (LNAPL) spill through the unsaturated zone to the top of the water table. Benzene leaching from LNAPL to the ground water was further routed through the alluvial aquifer. Contaminant plumes were simulated over 50 yr of transport and remediation costs assigned for each of the five treatment options for each of these years. The results of these efforts show that active remediation is most cost effective after a set point or geochemical quasi-equilibrium is reached, where long-term improvements in technology greatly tilt the recommended option toward remediation. Finally, the impacts associated with increasingly rigorous regulatory levels present potentially significant penalties for the remediation option, but their likelihood of occurrence is difficult to define

  16. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies

  17. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  18. The soil remediation fund for petrol stations in Belgium

    International Nuclear Information System (INIS)

    Naeyer, F. de; Van Dyck, E.; Janssens, J.P.; Duliere, A.; Fondaire, D.; Bodart, O.

    2005-01-01

    In the Flemish, Brussels-Capital and Walloon Region, petrol stations are subjected to strict operating standards, to avoid soil contamination as much as possible in the future. Besides these operating requirements, regional authorities also issued regulations regarding the remediation of contaminated soils. For many petrol stations operators, land owners and users, these rules and regulations are a heavy financial burden. As a result, the soil contamination threaten to become a public charge, due to a lack of adequate remediation by the stakeholders. After years of negotiating between the petroleum industry and the government the negotiations finally resulted in a cooperation agreement between the Federal Government, the Flemish, Walloon and Brussels-Capital Regions regarding the execution and financing of the remediation of contaminated soil at petrol stations. The cooperation agreement, signed in Brussels on 13 December 2002 and approved by all Regions and the Federal Government, makes it possible to provide a structured approach for the remediation of the soil contamination at petrol stations in Belgium. In the cooperation agreement the establishment of an Inter-regional Soil Remediation Committee is provided to guarantee the fund's independence and to observe the fund's operation. The official start is given through the accreditation of BOFAS by the Inter-regional Soil Remediation Committee. To calculate the amount that would be necessary for the remediation of the soil contamination at petrol stations and the contribution to the fund, an economical research has been carried out. This research indicated that the total cost for the remediation of the soil contamination at petrol stations in Belgium is situated between 400 and 450 million EUR. BOFAS has calculated that 5.000 petrol stations can comply with the conditions mentioned in the cooperation agreement. Operators, Owners or Actual users can submit an application if they comply with the legally established

  19. The soil remediation fund for petrol stations in Belgium

    Energy Technology Data Exchange (ETDEWEB)

    Naeyer, F. de; Van Dyck, E. [OVAM, Mechelen (Belgium); Janssens, J.P.; Duliere, A. [BIM, Brussel (Belgium); Fondaire, D. [DGRNE, Liege (Belgium); Bodart, O. [Governement Wallon, Namur (Belgium)

    2005-07-01

    In the Flemish, Brussels-Capital and Walloon Region, petrol stations are subjected to strict operating standards, to avoid soil contamination as much as possible in the future. Besides these operating requirements, regional authorities also issued regulations regarding the remediation of contaminated soils. For many petrol stations operators, land owners and users, these rules and regulations are a heavy financial burden. As a result, the soil contamination threaten to become a public charge, due to a lack of adequate remediation by the stakeholders. After years of negotiating between the petroleum industry and the government the negotiations finally resulted in a cooperation agreement between the Federal Government, the Flemish, Walloon and Brussels-Capital Regions regarding the execution and financing of the remediation of contaminated soil at petrol stations. The cooperation agreement, signed in Brussels on 13 December 2002 and approved by all Regions and the Federal Government, makes it possible to provide a structured approach for the remediation of the soil contamination at petrol stations in Belgium. In the cooperation agreement the establishment of an Inter-regional Soil Remediation Committee is provided to guarantee the fund's independence and to observe the fund's operation. The official start is given through the accreditation of BOFAS by the Inter-regional Soil Remediation Committee. To calculate the amount that would be necessary for the remediation of the soil contamination at petrol stations and the contribution to the fund, an economical research has been carried out. This research indicated that the total cost for the remediation of the soil contamination at petrol stations in Belgium is situated between 400 and 450 million EUR. BOFAS has calculated that 5.000 petrol stations can comply with the conditions mentioned in the cooperation agreement. Operators, Owners or Actual users can submit an application if they comply with the legally

  20. Lessons Learned from Environmental Remediation Programmes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-03-15

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  1. Lessons Learned from Environmental Remediation Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  2. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  3. Approaches for assessing sustainable remediation

    DEFF Research Database (Denmark)

    Søndergaard, Gitte Lemming; Binning, Philip John; Bjerg, Poul Løgstrup

    Sustainable remediation seeks to reduce direct contaminant point source impacts on the environment, while minimizing the indirect cost of remediation to the environment, society and economy. This paper presents an overview of available approaches for assessing the sustainability of alternative...... remediation strategies for a contaminated site. Most approaches use multi-criteria assessment methods (MCA) to structure a decision support process. Different combinations of environmental, social and economic criteria are employed, and are assessed either in qualitative or quantitative forms with various...... tools such as life cycle assessment and cost benefit analysis. Stakeholder involvement, which is a key component of sustainable remediation, is conducted in various ways. Some approaches involve stakeholders directly in the evaluation or weighting of criteria, whereas other approaches only indirectly...

  4. On site remediation of a fuel spill and soil reuse in Antarctica.

    Science.gov (United States)

    McWatters, R S; Wilkins, D; Spedding, T; Hince, G; Raymond, B; Lagerewskij, G; Terry, D; Wise, L; Snape, I

    2016-11-15

    The first large-scale remediation of fuel contamination in Antarctica treated 10000L of diesel dispersed in 1700t of soil, and demonstrated the efficacy of on-site bioremediation. The project progressed through initial site assessment and natural attenuation, passive groundwater management, then active remediation and the managed reuse of soil. Monitoring natural attenuation for the first 12years showed contaminant levels in surface soil remained elevated, averaging 5000mg/kg. By contrast, in five years of active remediation (excavation and biopile treatment) contaminant levels decreased by a factor of four. Chemical indicators showed hydrocarbon loss was apportioned to both biodegradation and evaporative processes. Hydrocarbon degradation rates were assessed against biopile soil temperatures, showing a phase of rapid degradation (first 100days above soil temperature threshold of 0°C) followed by slower degradation (beyond 100days above threshold). The biopiles operated successfully within constraints typical of harsh climates and remote sites, including limitations on resources, no external energy inputs and short field seasons. Non-native microorganisms (e.g. inoculations) and other organic materials (e.g. bulking agents) are prohibited in Antarctica making this cold region more challenging for remediation than the Arctic. Biopile operations included an initial fertiliser application, biannual mechanical turning of the soil and minimal leachate recirculation. The biopiles are a practical approach to remediate large quantities of contaminated soil in the Antarctic and already 370t have been reused in a building foundation. The findings presented demonstrate that bioremediation is a viable strategy for Antarctica and other cold regions. Operators can potentially use the modelled relationship between days above 0°C (threshold temperature) and the change in degradation rates to estimate how long it would take to remediate other sites using the biopile technology

  5. Herbal remedies and supplements for weight loss

    Science.gov (United States)

    Weight loss - herbal remedies and supplements; Obesity - herbal remedies; Overweight - herbal remedies ... health care provider. Nearly all over-the-counter supplements with claims of weight-loss properties contain some ...

  6. Flood menace in Kaduna Metropolis: impacts, remedial and ...

    African Journals Online (AJOL)

    This study assesses how Kaduna Metropolis have been affected by flood menace incidences as it takes a look at the devastating impacts, remedial and management strategies at curbing flooding in Kaduna Metropolis which has almost become a yearly occurrence. Data for this study were obtained from questionnaires, ...

  7. New Mexico English Remediation Taskforce Report

    Science.gov (United States)

    New Mexico Higher Education Department, 2016

    2016-01-01

    In March, 2016, the state of New Mexico established a Remediation Task Force to examine remediation reform efforts across the state's higher education institutions. On March 11, the Task Force met for the "New Mexico Corequisite Remediation at Scale Policy Institute" in order to learn about the results of the latest national reform…

  8. Communication activities during remediation project of Zavratec

    International Nuclear Information System (INIS)

    Kukovica, T.; Mele, I.

    1996-01-01

    The remediation project of temporary storage of radioactive waste near village Zavratec is under way. The Agency for Radwaste Management was assigned to perform this project by the Slovenian government. Radioactive waste was stored on site of Zavratec in 1961. That year an accident has occurred at Oncological institute in Ljubljana in which several rooms and some equipment have been contaminated by the content of radium applicator. Radioactive waste from decontamination was transported and stored in an old Italian military barrack near village Zavratec. The storage became known to public in eighties by the TV report. Since that time it is frequently the subject of public polemics and discussions. This year the first part of remediation project, i.e. the activity measurements and sorting of radioactive waste is taking place. It is planned to conclude the project next year. For successful realization of the project the PR activities, specially the communication with the local community, are of great importance. Special plan of these activities has been prepared by the Agency for Radwaste Management in early stage of the project. Initial activities have already been successfully realized. In this paper the communication plan is presented and most important elements of this plan are briefly described. (author)

  9. Remedial measures against high levels of radioactive cesium in Swedish lake fish

    International Nuclear Information System (INIS)

    Andersson, T.; Nilsson, Aa.; Haakanson, L.; Kvarnaes, H.

    1991-01-01

    The Swedish Radiation Protection Institute (SSI) has provided funds for the testing of methods to reduce the concentration of radioactive cesium in fish. The main purpose of this report is to present to remedies tested and to give an account of the effect they had on the concentration of Cs-137 in fish. In addition, analyses are made of the lake-specific factors contributing to the Cs-uptake in fish in the tested lakes. The time interval between the remedies adopted and the latest fish analyses (about 2 years on average) is not sufficient to statistically establish the small effects of the remedies. A longer time series of data is required for this

  10. Remediation Approach for the Integrated Facility Disposition Project at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kirk, P.G.; Stephens, Jr.J.M.

    2009-01-01

    The Integrated Facility Disposition Project (IFDP) is a multi-billion-dollar remediation effort being conducted by the U.S. Department of Energy (DOE) Office of Environmental Management in Oak Ridge, Tennessee. The scope of the IFDP encompasses remedial actions related to activities conducted over the past 65 years at the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12). Environmental media and facilities became contaminated as a result of operations, leaks, spills, and past waste disposal practices. ORNL's mission includes energy, environmental, nuclear security, computational, and materials research and development. Remediation activities will be implemented at ORNL as part of IFDP scope to meet remedial action objectives established in existing and future decision documents. Remedial actions are necessary (1) to comply with environmental regulations to reduce human health and environmental risk and (2) to release strategic real estate needed for modernization initiatives at ORNL. The scope of remedial actions includes characterization, waste management, transportation and disposal, stream restoration, and final remediation of contaminated soils, sediments, and groundwater. Activities include removal of at or below-grade substructures such as slabs, underground utilities, underground piping, tanks, basins, pits, ducts, equipment housings, manholes, and concrete-poured structures associated with equipment housings and basement walls/floors/columns. Many interim remedial actions involving groundwater and surface water that have not been completed are included in the IFDP remedial action scope. The challenges presented by the remediation of Bethel Valley at ORNL are formidable. The proposed approach to remediation endeavors to use the best available technologies and technical approaches from EPA and other federal agencies and lessons learned from previous cleanup efforts. The objective is to minimize cost, maximize remedial

  11. Groundwater re-injection at Fernald: Its role in accelerating the aquifer remedy

    International Nuclear Information System (INIS)

    Broberg, Kenneth A.; Janke, Robert

    2000-01-01

    A successful field-scale demonstration of the use of groundwater re-injection at the Fernald Environmental Management Project (FEMP) was recently completed, bringing the U.S. Department of Energy one step closer to achieving an accelerated site remediation. The demonstration marks the end of a several-year effort to evaluate (a) whether re-injection could be conducted efficiently at Fernald and (b) whether the approved aquifer remedy at Fernald would benefit from incorporating re-injection

  12. Proceedings of the remediation technologies symposium 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This conference provided a forum to discuss the remediation of contaminated sites. It was attended by all industry sectors that have an interest in learning about technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation and industrial pollutant treatments. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies. The diversified sessions at this conference were entitled: regulatory update; Montreal Centre of Excellence in Brownfields Rehabilitation; soil and groundwater remediation through the Program of Energy Research and Development at Environment Canada; technology from the Netherlands; bioremediation; hydrocarbons; in-situ remediation; phytoremediation; salt management; unique locations; and, miscellaneous issues. Some areas and case studies covered in the presentations included: biological and non-biological treatments; thermal desorption; encapsulation; natural attenuation; multi-phase extraction; electrochemical remediation; and membrane technology. The conference featured 63 presentations, of which 23 have been catalogued separately for inclusion in this database. tabs., figs.

  13. Proceedings of the remediation technologies symposium 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This conference provided a forum to discuss the remediation of contaminated sites. It was attended by all industry sectors that have an interest in learning about technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation and industrial pollutant treatments. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies. The diversified sessions at this conference were entitled: regulatory update; Montreal Centre of Excellence in Brownfields Rehabilitation; soil and groundwater remediation through the Program of Energy Research and Development at Environment Canada; technology from the Netherlands; bioremediation; hydrocarbons; in-situ remediation; phytoremediation; salt management; unique locations; and, miscellaneous issues. Some areas and case studies covered in the presentations included: biological and non-biological treatments; thermal desorption; encapsulation; natural attenuation; multi-phase extraction; electrochemical remediation; and membrane technology. The conference featured 63 presentations, of which 23 have been catalogued separately for inclusion in this database. tabs., figs

  14. EBR-II: twenty years of operating experience

    International Nuclear Information System (INIS)

    Lentz, G.L.; Buschman, H.W.; Smith, R.N.

    1985-01-01

    Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab

  15. Twenty years of meta-analyses in orthopaedic surgery: has quality kept up with quantity?

    Science.gov (United States)

    Dijkman, Bernadette G; Abouali, Jihad A K; Kooistra, Bauke W; Conter, Henry J; Poolman, Rudolf W; Kulkarni, Abhaya V; Tornetta, Paul; Bhandari, Mohit

    2010-01-01

    As the number of studies in the literature is increasing, orthopaedic surgeons highly depend on meta-analyses as their primary source of scientific evidence. The objectives of this review were to assess the scientific quality and number of published meta-analyses on orthopaedics-related topics over time. We conducted, in duplicate and independently, a systematic review of published meta-analyses in orthopaedics in the years 2005 and 2008 and compared them with a previous systematic review of meta-analyses from 1969 to 1999. A search of electronic databases (MEDLINE, EMBASE, and the Cochrane Database of Systematic Reviews) was performed to identify meta-analyses published in 2005 and 2008. We searched bibliographies and contacted content experts to identify additional relevant studies. Two investigators independently assessed the quality of the studies, using the Oxman and Guyatt index, and abstracted relevant data. We included forty-five and forty-four meta-analyses from 2005 and 2008, respectively. While the number of meta-analyses increased fivefold from 1999 to 2008, the mean quality score did not change significantly over time (p = 0.067). In the later years, a significantly lower proportion of meta-analyses had methodological flaws (56% in 2005 and 68% in 2008) compared with meta-analyses published prior to 2000 (88%) (p = 0.006). In 2005 and 2008, respectively, 18% and 30% of the meta-analyses had major to extensive flaws in their methodology. Studies from 2008 with positive conclusions used and described appropriate criteria for the validity assessment less often than did those with negative results. The use of random-effects and fixed-effects models as pooling methods became more popular toward 2008. Although the methodological quality of orthopaedic meta-analyses has increased in the past twenty years, a substantial proportion continues to show major to extensive flaws. As the number of published meta-analyses is increasing, a routine checklist for

  16. Integrated remediation of soil and groundwater

    International Nuclear Information System (INIS)

    Dykes, R.S.; Howles, A.C.

    1992-01-01

    Remediation of sites contaminated with petroleum hydrocarbons and other organic chemicals frequently focuses on a single phase of the chemical in question. This paper describes an integrated approach to remediation involving selection of complimentary technologies designed to create a remedial system which achieves cleanup goals in affected media in the shortest possible time consistent with overall environmental protection

  17. Effectiveness of remediation of metal-contaminated mangrove sediments (Sydney estuary, Australia).

    Science.gov (United States)

    Birch, Gavin; Nath, Bibhash; Chaudhuri, Punarbasu

    2015-04-01

    Industrial activities and urbanization have had a major consequence for estuarine ecosystem health and water quality globally. Likewise, Sydney estuary has been significantly impacted by widespread, poor industrial practices in the past, and remediation of legacy contaminants have been undertaken in limited parts of this waterway. The objective of the present investigation was to determine the effectiveness of remediation of a former Pb-contaminated industrial site in Homebush Bay on Sydney estuary (Australia) through sampling of inter-tidal sediments and mangrove (Avicennia marina) tissue (fine nutritive roots, pneumatophores, and leaves). Results indicate that since remediation 6 years previously, Pb and other metals (Cu, Ni and Zn) in surficial sediment have increased to concentrations that approach pre-remediation levels and that they were considerably higher than pre-settlement levels (3-30 times), as well as at the reference site. Most metals were compartmentalized in fine nutritive roots with bio-concentration factors greater than unity, while tissues of pneumatophores and leaves contained low metal concentrations. Lead concentrations in fine nutritive root, pneumatophore, and leaf tissue of mangroves from the remediated site were similar to trees in un-remediated sites of the estuary and were substantially higher than plants at the reference site. The situation for Zn in fine nutritive root tissue was similar. The source of the metals was either surface/subsurface water from the catchment or more likely remobilized contaminated sediment from un-remediated parts of Homebush Bay. Results of this study demonstrate the problems facing management in attempting to reduce contamination in small parts of a large impacted area to concentrations below local base level.

  18. French uranium mining sites remediation

    International Nuclear Information System (INIS)

    Roche, M.

    2002-01-01

    Following a presentation of the COGEMA's general policy for the remediation of uranium mining sites and the regulatory requirements, the current phases of site remediation operations are described. Specific operations for underground mines, open pits, milling facilities and confining the milled residues to meet long term public health concerns are detailed and discussed in relation to the communication strategies to show and explain the actions of COGEMA. A brief review of the current remediation situation at the various French facilities is finally presented. (author)

  19. Tritium tracer movement as an analogy for pump and treat remediation

    International Nuclear Information System (INIS)

    1994-12-01

    There has been debate over effectiveness of groundwater pump and treat remediation. The goal of the following discussion is to present evidence from a tracer test that illustrates the difficulty in removing contaminants from fractured shale that is typical of portions of the DOE-Oak Ridge Reservation (ORR). This report provides a brief prelude to more detailed analysis that is in progress. Attempts to remediate groundwater contamination with pump and treat technology have been hampered by difficulties in removing contaminants in slow flow zones. There is interest in using this remediation method on the ORR because it is an existing technology. However, this setting provides a rather extreme contrast between fast flow zones (fractures) and slow flow zones (the matrix surrounding the fractures). Over the past few years, the authors have begun to develop an understanding of how contaminants move in fractures and how contaminant exchange between the fracture and matrix occurs. In particular, they have evidence from a long term tritium tracer test that has direct bearing on potential success or failure of pump and treat remediation in fractured rocks

  20. Ten Years, Twenty Issues, and Two Hundred Papers of Numeracy: Toward International Reach and Transdisciplinary Utility

    Directory of Open Access Journals (Sweden)

    H.L. Vacher

    2017-07-01

    Full Text Available This issue completes the first ten years of Numeracy. The purpose of this introductory editorial is to review what has happened to the journal in those ten years. In the twenty issues, Numeracy’s output has been 201 papers counting the one or two editorials per issue. More than 50% of the papers are full, peer-reviewed articles, including 13 papers in two theme collections. The others are peer-reviewed notes and perspectives, editor-reviewed book reviews (15% of the total, and a column by contributing co-editor, Dorothy Wallace. The current issue marks an upswing in the number of notes, and our first discussion/reply. The number of papers per year has been increasing (e.g., 66% more in the last three years than in the first three years. The download rate has increased from about 5,000 in the first two years to 5,000 in about 40 days now. The editorial goes on to document two main outcomes. First, the journal is gaining an international reach: more than half the downloads occur outside the United States now, and the number of contributions from outside the United States has increased from 4 in the first five years to 15 in the second five years. Second, the across-the-curriculum nature of quantitative literacy is coming to the fore. The transdisciplinarity of QL is strikingly evident in this issue, which is discussed in some detail, especially how it conforms to the mission of the Association of American Colleges and Universities. The editorial ends with some results from a small ad hoc study of Google Scholar Citation Profiles. The question was, of the profiles that used “numeracy” or “quantitative literacy” as keywords, what other keywords did those profiles use, and what were the source countries? The results show that (1 QL is very much an American term, (2 there is, metaphorically, a vast and interesting numeracy ecosystem out there for Numeracy to engage and serve, and (3 as we become more global, the transdisciplinary relevance

  1. Application of a World Wide Web technology to environmental remediation

    International Nuclear Information System (INIS)

    Johnson, R.; Durham, L. A.

    2000-01-01

    As part of the Formerly Utilized Site Remedial Action Program (FUSRAP), the United States Army Corps of Engineers (USACE), Buffalo District, is responsible for overseeing the remediation of several sites within its jurisdiction. FUSRAP sites are largely privately held facilities that were contaminated by activities associated with the nuclear weapons program in the 1940s, 50s, and 60s. The presence of soils and structures contaminated with low levels of radionuclides is a common problem at these sites. Typically, contaminated materials must be disposed of off-site at considerable expense (up to several hundred dollars per cubic yard of waste material). FUSRAP is on an aggressive schedule, with most sites scheduled for close-out in the next couple of years. Among the multitude of tasks involved in a typical remediation project is the need to inform and coordinate with active stakeholder communities, including local, state, and federal regulators

  2. A novel phytoremediation technology shown to remediate petroleum hydrocarbons from soils in situ

    Energy Technology Data Exchange (ETDEWEB)

    Huang, X.D.; Yu, X.M.; Gerhardt, K.; Glick, B.; Greenberg, B [Waterloo Environmental Biotechnology Inc., Hamilton, ON (Canada); Waterloo Univ., ON (Canada). Dept. of Biology

    2009-04-01

    This article described a newly developed, advanced microbe-enhanced phytoremediation system that can be used to remediate lands polluted by hydrocarbons, salts and metals. The technology uses 3 complementary processes to achieve effective remediation of strongly bound persistent organic pollutants (POPs) from soil. The remediation process involves physical soil treatment, photochemical photooxidation, microbial remediation and growth of plants treated with plant growth promoting rhizobacteria (PGPR). The PGPR-enhanced phytoremediation system (PEPS) alleviates plant stress and increases biodegradation activities, thereby accelerating plant growth in the presence of POPs or poor soils. The PEPS has been used successfully to remove petroleum hydrocarbons (PHCs) from impacted soils in situ at several sites across Canada. Studies have shown that the PHCs are degraded in the rhizosphere. This article also presented a summary of the work conducted at 3 sites in Alberta. It took only 2 years to remediate the 3 sites to levels required for site closure under Alberta Tier 1 guidelines. It was concluded that PEPS is equally effective for total PHC and Fraction 3 CCME hydrocarbons. 1 tab., 3 figs.

  3. The benefits from environmental remediation

    International Nuclear Information System (INIS)

    Falck, W.E.

    2002-01-01

    Environmental remediation projects inevitably take place against a backdrop of overall social goals and values. These goals can include, for example, full employment, preservation of the cultural, economic and archaeological resources, traditional patterns of land use, spiritual values, quality of life factors, biological diversity, environmental and socio-economic sustainability, protection of public health. Different countries will have different priorities, linked to the overall set of societal goals and the availability of resources, including funding, man-power and skills. These issues are embedded within both a national and local socio-cultural context, and will shape the way in which the remediation process is structured in any one country. The context will shape both the overall objectives of a remediation activity within the framework of competing societal goals, as well as generate constraints on the decision making process. Hence, the overall benefit of a remediation project is determined by its overall efficiency and effectiveness within the given legal, institutional, and governance framework, under the prevailing socio-economic boundary conditions, and balancing technology performance and risk reduction with fixed or limited budgetary resources, and is not simply the result of the technical remediation operation itself. (author)

  4. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA)

  5. Annual status report on the Uranium Mill Tailings Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  6. Remediation of the Lermontov mining site in Russia

    International Nuclear Information System (INIS)

    Krotkov, V.V.

    2001-01-01

    For 40 years, uranium mines were operated in the direct vicinity of the spas of Mineralnyje Wody, Pjatigorsk, Kislowodsk, Jessentuki and Zheleznowodsk by the Almaz company. Now that the mines have been abandoned, the spa region is surrounded by contaminated land. Remedial measures are projected in accordance with radiation protection standards [de

  7. Radiation safety during remediation of the SevRAO facilities: 10 years of regulatory experience.

    Science.gov (United States)

    Sneve, M K; Shandala, N; Kiselev, S; Simakov, A; Titov, A; Seregin, V; Kryuchkov, V; Shcheblanov, V; Bogdanova, L; Grachev, M; Smith, G M

    2015-09-01

    In compliance with the fundamentals of the government's policy in the field of nuclear and radiation safety approved by the President of the Russian Federation, Russia has developed a national program for decommissioning of its nuclear legacy. Under this program, the State Atomic Energy Corporation 'Rosatom' is carrying out remediation of a Site for Temporary Storage of spent nuclear fuel (SNF) and radioactive waste (RW) at Andreeva Bay located in Northwest Russia. The short term plan includes implementation of the most critical stage of remediation, which involves the recovery of SNF from what have historically been poorly maintained storage facilities. SNF and RW are stored in non-standard conditions in tanks designed in some cases for other purposes. It is planned to transport recovered SNF to PA 'Mayak' in the southern Urals. This article analyses the current state of the radiation safety supervision of workers and the public in terms of the regulatory preparedness to implement effective supervision of radiation safety during radiation-hazardous operations. It presents the results of long-term radiation monitoring, which serve as informative indicators of the effectiveness of the site remediation and describes the evolving radiation situation. The state of radiation protection and health care service support for emergency preparedness is characterized by the need to further study the issues of the regulator-operator interactions to prevent and mitigate consequences of a radiological accident at the facility. Having in mind the continuing intensification of practical management activities related to SNF and RW in the whole of northwest Russia, it is reasonable to coordinate the activities of the supervision bodies within a strategic master plan. Arrangements for this master plan are discussed, including a proposed programme of actions to enhance the regulatory supervision in order to support accelerated mitigation of threats related to the nuclear legacy in the

  8. Natural Remediation at Savannah River Site

    International Nuclear Information System (INIS)

    Lewis, C. M.; Van Pelt, R.

    2002-01-01

    Natural remediation is a general term that includes any technology or strategy that takes advantage of natural processes to remediate a contaminated media to a condition that is protective of human health and the environment. Natural remediation techniques are often passive and minimally disruptive to the environment. They are generally implemented in conjunction with traditional remedial solutions for source control (i.e., capping, stabilization, removal, soil vapor extraction, etc.). Natural remediation techniques being employed at Savannah River Site (SRS) include enhanced bio-remediation, monitored natural attenuation, and phytoremediation. Enhanced bio-remediation involves making nutrients available and conditions favorable for microbial growth. With proper precautions and feeding, the naturally existing microbes flourish and consume the contaminants. Case studies of enhanced bio-remediation include surface soils contaminated with PCBs and pesticides, and Volatile Organic Compound (VOC) contamination in both the vadose zone and groundwater. Monitored natural attenuation (MNA) has been selected as the preferred alternative for groundwater clean up at several SRS waste units. Successful implementation of MNA has been based on demonstration that sources have been controlled, groundwater modeling that indicates that plumes will not expand or reach surface water discharge points at levels that exceed regulatory limits, and continued monitoring. Phytoremediation is being successfully utilized at several SRS waste units. Phytoremediation involves using plants and vegetation to uptake, break down, or manage contaminants in groundwater or soils. Case studies at SRS include managing groundwater plumes of tritium and VOCs with pine trees that are native to the area. Significant decreases in tritium discharge to a site stream have been realized in one phytoremediation project. Studies of other vegetation types, methods of application, and other target contaminants are

  9. International experience in tailings pond remediation

    Energy Technology Data Exchange (ETDEWEB)

    MacG. Robertson, A. [Robertson GeoConsultants Ltd., Vancouver (Canada)

    2001-07-01

    Tailings pond remediation is required primarily on mine closure. While mining is an ancient industry, requirement for mine facility remediation is a comparatively new development. Requirement for remediation has come about partly as a result of mans awareness of the environmental impacts of mining and his desire to minimize this, partly, as a result of the ever-increasing scale and production rates of tailings generation and the resulting increased environmental impacts and safety risks. The paper starts with a review of the evolution of mans intolerance of environmental impacts from tailings production and the assignment of liability to remediate such impacts. Many of the tailings ponds currently undergoing remediation were designed and constructed using methods and technology that would be considered inappropriate for new impoundments being designed and developed today. The paper reviews the history of tailings impoundment design and construction practice and the resulting inherent deficiencies that must be remediated. Current practices and future trends in tailings pond remediation are reviewed. The evolution of regulatory requirements is not only in terms of technical and safety criteria, but also in terms of financial and political risk. Perhaps the most substantive driver of risk management is today the requirement for corporate governance at mining company board level and oversight of new project development in the underdeveloped countries by the large financial institutions responsible for funding projects. Embarrassment in the public eye and punishment in the stock markets for poor environmental and safety performance is driving the need for efficient and effective risk management of potential impacts and the remediation to avoid these. A basis for practical risk management is described. (orig.)

  10. International experience in tailings pond remediation

    International Nuclear Information System (INIS)

    Robertson, A.MacG.

    2001-01-01

    Tailings pond remediation is required primarily on mine closure. While mining is an ancient industry, requirement for mine facility remediation is a comparatively new development. Requirement for remediation has come about partly as a result of mans awareness of the environmental impacts of mining and his desire to minimize this, partly, as a result of the ever-increasing scale and production rates of tailings generation and the resulting increased environmental impacts and safety risks. The paper starts with a review of the evolution of mans intolerance of environmental impacts from tailings production and the assignment of liability to remediate such impacts. Many of the tailings ponds currently undergoing remediation were designed and constructed using methods and technology that would be considered inappropriate for new impoundments being designed and developed today. The paper reviews the history of tailings impoundment design and construction practice and the resulting inherent deficiencies that must be remediated. Current practices and future trends in tailings pond remediation are reviewed. The evolution of regulatory requirements is not only in terms of technical and safety criteria, but also in terms of financial and political risk. Perhaps the most substantive driver of risk management is today the requirement for corporate governance at mining company board level and oversight of new project development in the underdeveloped countries by the large financial institutions responsible for funding projects. Embarrassment in the public eye and punishment in the stock markets for poor environmental and safety performance is driving the need for efficient and effective risk management of potential impacts and the remediation to avoid these. A basis for practical risk management is described. (orig.)

  11. Twenty-Five Years of Gene Therapy for ADA-SCID: From Bubble Babies to an Approved Drug.

    Science.gov (United States)

    Ferrua, Francesca; Aiuti, Alessandro

    2017-11-01

    Twenty-five years have passed since first attempts of gene therapy (GT) in children affected by severe combined immunodeficiency (SCID) due to adenosine deaminase (ADA) defect, also known by the general public as bubble babies. ADA-SCID is fatal early in life if untreated. Unconditioned hematopoietic stem cell (HSC) transplant from matched sibling donor represents a curative treatment but is available for few patients. Enzyme replacement therapy can be life-saving, but its chronic use has many drawbacks. This review summarizes the history of ADA-SCID GT over the last 25 years, starting from first pioneering studies in the early 1990s using gamma-retroviral vectors, based on multiple infusions of genetically corrected autologous peripheral blood lymphocytes. HSC represented the ideal target for gene correction to guarantee production of engineered multi-lineage progeny, but it required a decade to achieve therapeutic benefit with this approach. Introduction of low-intensity conditioning represented a crucial step in achieving stable gene-corrected HSC engraftment and therapeutic levels of ADA-expressing cells. Recent clinical trials demonstrated that gamma-retroviral GT for ADA-SCID has a favorable safety profile and is effective in restoring normal purine metabolism and immune functions in patients >13 years after treatment. No abnormal clonal proliferation or leukemia development have been observed in >40 patients treated experimentally in five different centers worldwide. In 2016, the medicinal product Strimvelis™ received marketing approval in Europe for patients affected by ADA-SCID without a suitable human leukocyte antigen-matched related donor. Positive safety and efficacy results have been obtained in GT clinical trials using lentiviral vectors encoding ADA. The results obtained in last 25 years in ADA-SCID GT development fundamentally contributed to improve patients' prognosis, together with earlier diagnosis thanks to newborn screening. These advances

  12. Comparison of the environmental impacts of two remediation technologies used at hydrocarbon contaminated sites

    International Nuclear Information System (INIS)

    Viikala, R.; Kuusola, J.

    2000-01-01

    Investigation and remediation of contaminated sites has rapidly increased in Finland during the last decade. Public organisations as well as private companies are investigating and remediating their properties, e.g. redevelopment or business transactions. Also numerous active and closed gasoline stations have been investigated and remediated during the last few years. Usually the contaminated sites are remediated to limit values regardless of the risk caused by contamination. The limit values currently used in Finland for hydrocarbon remediation at residential or ground water areas are 300 mg/kg of total hydrocarbons and 100 mg/kg of volatile hydrocarbons (boiling point < appr. 200 deg C). Additionally, compounds such as aromatic hydrocarbons have specific limit values. Remediation of hydrocarbon contaminated sites is most often carried out by excavating the contaminated soil and taking it to a landfill by lorries. As distances from the sites to landfills are generally rather long, from tens of kilometres to few hundred kilometres, it is evident that this type of remediation has environmental impacts. Another popular technology used at sites contaminated by volatile hydrocarbons is soil vapour extraction (SVE). SVE is a technique of inducing air flow through unsaturated soils by vapour extraction wells or pipes to remove organic contaminants with an off-gas treatment system. The purpose of this study was to evaluate some of the environmental impacts caused by remediation of hydrocarbon contaminated soil. Energy consumption and air emissions related remedial activities of the two methods were examined in this study. Remediation of the sites used in this study were carried out by Golder Associates Oy in different parts of Finland in different seasons. Evaluation was made by using life cycle assessment based approach

  13. Groundwater remediation at the Hanford site

    International Nuclear Information System (INIS)

    Fries, W.

    1993-01-01

    Ion exchange resin and adsorption technology has been used successfully to treat diversified types of toxic waste water for many years. Even though the Hanford Site presents many unique problems, the author believes these technologies can remediate the groundwater at this site. However, treatment of the sludge in tanks generally is beyond the pale of these technologies except for the possibility of experimental studies being performed at the University of Idaho (Troescher)

  14. Career patterns : A twenty-year panel study

    NARCIS (Netherlands)

    Biemann, Torsten; Zacher, Hannes; Feldman, Daniel C.

    2012-01-01

    Using 20 years of employment and job mobility data from a representative German sample (N=1259), we employ optimal matching analysis (OMA) to identify six career patterns which deviate from the traditional career path of long-term, full-time employment in one organization. Then, in further analyses,

  15. Twenty years of chemistry associated with the needs and utilization of nuclear reactors at the 'Boris Kidric' Institute of nuclear sciences, Vinca, Yugoslavia

    International Nuclear Information System (INIS)

    1969-01-01

    This publication covers nine review papers on the following topics related to the needs and utilization of nuclear reactors in the Boris Kidric Institute of nuclear sciences during previous twenty years: radiochemistry, hot atom chemistry, isotope production, spent nuclear fuel reprocessing, chemistry of transuranium elements; liquid radioactive waste processing, purification of reactor coolant water by inorganic ion exchangers, research related to deuterium concentration processes, and chemical dosimetry at the RA reactor [sr

  16. Twenty years of radiation sterilization in Croatia

    Science.gov (United States)

    Ražem, Dus̆an

    2004-09-01

    The development of radiation processing in Croatia is described from its inception 20 years ago up to the present time. Annual throughputs of treated materials are given by the categories of materials and pertaining volumes. The pasteurization of hard gelatine capsules occured during the early stages, while sterilization of disposable medical supplies has been dominant in the later stages. Irradiation of foods and of cosmetics and toiletries has been a minor fraction of the total throughput. Since the recovery of everyday life and economy of the country after the war, the total throughput has increased steadily to reach 13,000 m 3 kGy in 2002, 90% of which are medical supplies. Estimates of the present maximum capacity of 30,000 m 3 kGy and of future needs indicate that the present rate of growth could be sustained for the next several years only, unless a major upgrading is undertaken. An estimate of potential future needs is made.

  17. Twenty years of radiation sterilization in Croatia

    International Nuclear Information System (INIS)

    Razem, Dusan

    2004-01-01

    The development of radiation processing in Croatia is described from its inception 20 years ago up to the present time. Annual throughputs of treated materials are given by the categories of materials and pertaining volumes. The pasteurization of hard gelatine capsules occured during the early stages, while sterilization of disposable medical supplies has been dominant in the later stages. Irradiation of foods and of cosmetics and toiletries has been a minor fraction of the total throughput. Since the recovery of everyday life and economy of the country after the war, the total throughput has increased steadily to reach 13,000 m 3 kGy in 2002, 90% of which are medical supplies. Estimates of the present maximum capacity of 30,000 m 3 kGy and of future needs indicate that the present rate of growth could be sustained for the next several years only, unless a major upgrading is undertaken. An estimate of potential future needs is made

  18. Twenty years of radiation sterilization in Croatia

    Energy Technology Data Exchange (ETDEWEB)

    Razem, Dusan E-mail: razem@irb.hr

    2004-10-01

    The development of radiation processing in Croatia is described from its inception 20 years ago up to the present time. Annual throughputs of treated materials are given by the categories of materials and pertaining volumes. The pasteurization of hard gelatine capsules occured during the early stages, while sterilization of disposable medical supplies has been dominant in the later stages. Irradiation of foods and of cosmetics and toiletries has been a minor fraction of the total throughput. Since the recovery of everyday life and economy of the country after the war, the total throughput has increased steadily to reach 13,000 m{sup 3} kGy in 2002, 90% of which are medical supplies. Estimates of the present maximum capacity of 30,000 m{sup 3} kGy and of future needs indicate that the present rate of growth could be sustained for the next several years only, unless a major upgrading is undertaken. An estimate of potential future needs is made.

  19. Remediation of sites with dispersed radioactive contamination

    International Nuclear Information System (INIS)

    2004-01-01

    To respond to the needs of Member States, the IAEA launched an environmental remediation project to deal with the problems of radioactive contamination worldwide. The IAEA environmental remediation project includes an IAEA Coordinated Research Project, as well as the participation of IAEA experts in concrete remediation projects when requested by individual Member States. The IAEA has prepared several documents dedicated to particular technical or conceptual areas, including documents on the characterization of contaminated sites, technical and non-technical factors relevant to the selection of a preferred remediation strategy and technique, overview of applicable techniques for environmental remediation,, options for the cleanup of contaminated groundwater and planning and management issues. In addition, a number of other IAEA publications dealing with related aspects have been compiled under different IAEA projects; these include TECDOCs on the remediation of uranium mill tailings, the decontamination of buildings and roads and the characterization of decommissioned sites. Detailed procedures for the planning and implementation of remedial measures have been developed over the past decade or so. A critical element is the characterization of the contamination and of the various environmental compartments in which it is found, in order to be able to evaluate the applicability of remediation techniques. The chemical or mineralogical form of the contaminant will critically influence the efficiency of the remediation technique chosen. Careful delineation of the contamination will ensure that only those areas or volumes of material that are actually contaminated are treated. This, in turn, reduces the amount of any secondary waste generated. The application of a remediation technique requires holistic studies examining the technical feasibility of the proposed measures, including analyses of their impact. Consequently, input from various scientific and engineering

  20. Remediation of an oily leachate pond in Estonia.

    Science.gov (United States)

    Kriipsalu, Mait; Marques, Marcia; Hogland, William

    2005-12-01

    Until recent years, waste oil and oil-contaminated waters commonly ended up in landfills. At some dump sites, ponds of oily liquids and leachate were formed. To remediate such ponds, an interdisciplinary approach is now required, keeping costs at an affordable level, particularly in countries with changing economies. From 1974 to 1993, liquid oily wastes taken to the Laguja landfill, in Estonia, were disposed of in a pond with a surface area of 9800 m2. It was estimated that the pond contained 4500-6000 m3 of oily water and 3500 m3 of oil-containing bottom sediments. This study aimed at developing an environmentally sound and cost-effective method for remediation of the oily liquids, leachate and contaminated underlying sediment material, to meet the existing legal demands. It was concluded that treatment of contaminated water is well established and the procedures carried out to meet the regulatory demands achieved satisfactory results. However, regarding treatment of sediments it was concluded that legal and technological aspects, as well as monitoring procedures are not fully established and are usually underestimated. Laboratory investigations can provide valuable information in decision-making, and contribute to effective full-scale remediation planning.

  1. Critical review of decision support tools for sustainability assessment of site remediation options.

    Science.gov (United States)

    Huysegoms, Lies; Cappuyns, Valérie

    2017-07-01

    In Europe alone, there are more than 2,5 million potentially contaminated sites of which 14% are expected to require remediation. Contaminated soil and groundwater can cause damage to human health as well as to valuable ecosystems. Globally more attention has been paid to this problem of soil contamination in the past decades. For example, more than 58 000 sites have been remediated in Europe between 2006 and 2011. Together with this increase in remediation projects there has been a surge in the development of new remediation technologies and decision support tools to be able to match every site and its specific characteristics to the best possible remediation alternative. In the past years the development of decision support tools (DST) has evolved in a more sustainable direction. Several DSTs added the claim not only to denote effective or technologically and economically feasible remediation alternatives but also to point out the more or most sustainable remediation alternatives. These trends in the evaluation of site remediation options left users with a confusing clew of possibly applicable tools to assist them in decision making for contaminated site remediation. This review provides a structured overview on the extent decision support tools for contaminated site remediation, that claim to assist in choosing the most sustainable remediation alternative, actually include the different elements of sustainability proposed in our assessment framework. The review contains an in-depth analysis of thirteen tools specifically developed to assess the sustainability of site remediation alternatives. This analysis is based on six criteria derived from the definition of sustainable development of the Brundtland report. The six criteria were concretized by using the three pillars of sustainability, applied to site remediation according to the SuRF-UK framework, two criteria derived from Life Cycle Assessment and Cost-Benefit Analysis, and an 'User friendly' criterion

  2. Data base management activities for the Remedial Action Program at ORNL: Calendar year 1988

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Hook, L.A.; Gentry, M.J.; McCord, R.A.; Faulkner, M.A.; Bledsoe, J.L.; Newman, K.A.; Owen, P.T.; Rosen, A.E.

    1989-04-01

    The ORNL Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations mandating corrective actions at contaminated sites. To achieve this goal, numerous and varied studies are being conducted to characterize the type and extent of contamination. Environmental data collected in support of other programs at ORNL are also of use to RAP. Collectively, these studies are generating a voluminous amount of data. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current DIMS and its role in supporting RAP during 1988 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on a description of the contents of the Numeric Data Base. The types of numeric data currently available are summarized in the tables and figures. More detailed information on the contents of the RAP Numeric Data Base has been assembled in a menu-driven format on IBM PC diskettes, which are available upon request. 6 refs

  3. Proceedings of the remediation technologies symposium 2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This conference provided an opportunity for industry, practitioners, researchers and regulators to discuss technical issues in environmental remediation research and the latest innovations in soil and groundwater remediation. Cost effective in-situ and ex-situ soil reclamation strategies were presented along with groundwater and surface water remediation strategies in 13 sessions entitled: hydrocarbon contamination; salt management; liability management; chemical oxidation; light non-aqueous phase liquids (LNAPL); Montreal Center of Excellence in Brownfields Rehabilitation; Alberta government updates; phytoremediation; natural attenuation; Lake Wabamun; ex-situ remediation; in-situ remediation; and, miscellaneous issues. Technological solutions for erosion control and water clarification were highlighted. The conference featured 52 presentations, of which 17 have been catalogued separately for inclusion in this database. tabs., figs.

  4. Groundwater remediation in the Straz leaching operation

    International Nuclear Information System (INIS)

    Novak, J.

    2001-01-01

    The locality affected by consequences of the chemical mining of the uranium during underground leaching 'in situ' is found in the area of the Czech Republic in the northeastern part of the Ceska Lipa district. In the contribution the complex groundwater remediation project is discussed. First, the risks of the current state are expressed. Then the alternatives of remediation of the both Cenomanian and Turonian aquifers are presented. Evaluation of the remediation alternatives with the view to the time-consumption, economy, ecology and the elimination of unacceptable risks for the population and environment is done. Finally, the present progress of remediation and the conception of remediation of chemical mining on deposit of Straz pod Ralskem are presented. (orig.)

  5. ICDF Complex Remedial Action Report

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  6. Electrodialytic soil remediation

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Ottosen, Lisbeth M.; Hansen, Lene

    1997-01-01

    It is not possible for all heavy metal polluted soils to remediate it by an applied electric field alone. A desorbing agent must in different cases be added to the soil in order to make the process possible or to make it cost effective......It is not possible for all heavy metal polluted soils to remediate it by an applied electric field alone. A desorbing agent must in different cases be added to the soil in order to make the process possible or to make it cost effective...

  7. Groundwater remediation from the past to the future: A bibliometric analysis.

    Science.gov (United States)

    Zhang, Shu; Mao, Guozhu; Crittenden, John; Liu, Xi; Du, Huibin

    2017-08-01

    Groundwater is an important component of terrestrial ecosystems and plays a role in geochemical cycling. Groundwater is also used for agricultural irrigation and for the domestic supply of drinking water in most nations. However, groundwater contamination has led to many research efforts on groundwater remediation technologies and strategies. This study evaluated a total of 5486 groundwater remediation-related publications from 1995 to 2015 using bibliometric technology and social network analysis, to provide a quantitative analysis and a global view on the current research trend and future research directions. Our results underline a strong research interest and an urgent need to remediate groundwater pollution due to the increasing number of both groundwater contamination and remediation publications. In the past two decades, the United States (U.S.) published 41.1% of the papers and it was the core country of the international collaboration network, cooperating with the other 19 most productive countries. Besides the active international collaboration, the funding agencies also played positive roles to foster the science and technology publications. With respect to the analysis of the distribution of funding agencies, the National Science Foundation of China sponsored most of the groundwater remediation research. We also identified the most productive journals, Environmental Science and Technology and Journal of Contaminant Hydrology, which published 334 and 259 scientific articles (including research articles and reviews) over the past 20 years, respectively. In addition to journal publications, a patent analysis was performed to show the impact of intellectual property protection on journal publications. Three major remediation technologies, including chemical oxidation, biodegradation and adsorption, have received increasing interest in both journal publication and patent development. Our results provide a valuable reference and global overview to identify

  8. Career Patterns: A Twenty-Year Panel Study

    Science.gov (United States)

    Biemann, Torsten; Zacher, Hannes; Feldman, Daniel C.

    2012-01-01

    Using 20years of employment and job mobility data from a representative German sample (N = 1259), we employ optimal matching analysis (OMA) to identify six career patterns which deviate from the traditional career path of long-term, full-time employment in one organization. Then, in further analyses, we examine which socio-demographic predictors…

  9. A Tale of Ambivalence: Salman Rushdie's "Two Years, Eight Months and Twenty-Eight Nights"

    Directory of Open Access Journals (Sweden)

    Tarik Ziyad Gulcu

    2017-09-01

    Full Text Available Salman Rushdie’s memoirs, essays and novels contribute to the appreciation of the contradictions in his outlook on life. His experiences in his family enable Rushdie to make efforts for objective and tolerant judgement of British lifestyle and culture. However, his isolation from the society in Britain despite his struggle for adaptation to British cultural values cause contradictions in his cultural identity. While Rushdie expresses his allegiance to India and its culture in The Ground Beneath Her Feet (1999, he reflects his alienation from his homeland in this novel as well. Similarly, in his Imaginary Homelands (1981-1991 whereas Rushdie questions the injustice and inequality caused by imperialism in The New Empire within Britain (1982, he justifies the colonialist discourse in Kipling (1990. He elaborates on the contradictions in his outlook on life in terms of his cultural ambivalence in his fictions such as Midnight’s Children (1981 and Shame (1983. However, in his latest novel, Two Years, Eight Months and Twenty-Eight Nights (2015, Rushdie reflects his cultural identity conflict in terms of rationalism-mysticism dichotomy. With the use of allegory as well as the lack of linearity in time and space, Rushdie justifies his cultural ambivalence in relation to the dynamism of contemporary world. Thus, Rushdie’s latest novel invites reading for its representation of the oppositions in his approach to life.

  10. DOE's Assurance Program for Remedial Action (APRA)

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Welty, C.G. Jr.; Needels, T.S.

    1985-01-01

    The US Department of Energy's (DOE) Office of Operational Safety (OOS) is presently developing and implementing the Assurance Program for Remedial Action (APRA) to overview DOE's Remedial Action programs. APRA's objective is to ensure the adequacy of environmental, safety and health (ES and H) protection practices within the four DOE Remedial Action programs: Grand Junction Remedial Action Program (GJRAP), Uranium Mill Tailings Remedial Action Program (UMTRAP), Formerly Utilized Sites Remedial Action Program (FUSRAP), and Surplus Facilities Management Program (SFMP). APRA encompasses all ES and H practices of DOE and its contractors/subcontractors within the four Remedial Action programs. Specific activities of APRA include document reviews, selected site visits, and program office appraisals. Technical support and assistance to OOS is being provided by APRA contractors in the evaluation of radiological standards and criteria, quality assurance measures, radiation measurements, and risk assessment practices. This paper provides an overview of these activities and discusses program to date, including the roles of OOS and the respective contractors. The contractors involved in providing technical support and assistance to OOS are Aerospace Corporation, Oak Ridge Associated Universities, and Pacific Northwest Laboratory

  11. DOE's Assurance Program for Remedial Action (APRA)

    International Nuclear Information System (INIS)

    Denham, D.H.; Stenner, R.D.; Welty, C.G. Jr.; Needels, T.S.

    1984-10-01

    The US Department of Energy's (DOE) Office of Operational Safety (OOS) is presently developing and implementing the Assurance Program for Remedial Action (APRA) to overview DOE's Remedial Action programs. APRA's objective is to ensure the adequacy of environmental, safety and health (ES and H) protection practices within the four DOE Remedial Action programs: Grand Junction Remedial Action Program (GJRAP), Uranium Mill Tailings Remedial Action Program (UMTRAP), Formerly Utilized Sites Remedial Action Program (FUSRAP), and Surplus Facilities Management Program (SFMP). APRA encompasses all ES and H practices of DOE and its contractors/subcontractors within the four Remedial Action programs. Specific activities of APRA include document reviews, selected site visits, and program office appraisals. Technical support and assistance to OOS is being provided by APRA contractors in the evaluation of radiological standards and criteria, quality assurance measures, radiation measurements, and risk assessment practices. This paper provides an overview of these activities and discusses progress to date, including the roles of OOS and the respective contractors. The contractors involved in providing technical support and assistance to OOS are Aerospace Corporation, Oak Ridge Associated Universities, and Pacific Northwest Laboratory

  12. Electrodialytic Remediation of Different Cu-Polluted Soils

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Hansen, Henrik K.; Hansen, Lene

    1999-01-01

    Based on characterization of a polluted soil a proper desorbing agent to be added to the soil before the remediation can be found. The desorbing agent can improve the remediation according to both energy consumption and duration of the action......Based on characterization of a polluted soil a proper desorbing agent to be added to the soil before the remediation can be found. The desorbing agent can improve the remediation according to both energy consumption and duration of the action...

  13. Comprehensive Assessment of Struggling Learners Referred to a Graduate Medical Education Remediation Program.

    Science.gov (United States)

    Warburton, Karen M; Goren, Eric; Dine, C Jessica

    2017-12-01

    Implementation of the Next Accreditation System has provided a standardized framework for identifying learners not meeting milestones, but there is as yet no corresponding framework for remediation. We developed a comprehensive assessment process that allows correct diagnosis of a struggling learner's deficit(s) to promote successful remediation. At the University of Pennsylvania, resident learners within the Department of Medicine who are not meeting milestones are referred to the Early Intervention Remediation Committee (EIRC). The EIRC, composed of 14 faculty members with expertise in remediation, uses a standardized process to assess learners' deficits. These faculty members categorize primary deficits as follows: medical knowledge, clinical reasoning, organization and efficiency, professionalism, and communication skills. The standardized process of assessment includes an analysis of the learner's file, direct communication with evaluators, an interview focused on learner perception of the problem, screening for underlying medical or psychosocial issues, and a review of systems for deficits in the 6 core competencies. Participants were surveyed after participating in this process. Over a 2-year period, the EIRC assessed and developed remediation plans for 4% of learners (14 of a total 342). Following remediation and reassessment, the identified problems were satisfactorily resolved in all cases with no disciplinary action. While the process was time intensive, an average of 45 hours per learner, the majority of faculty and residents rated it as positive and beneficial. This structured assessment process identifies targeted areas for remediation and adds to the tools available to Clinical Competency Committees.

  14. Electrodialytic remediation of solid waste

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Ottosen, Lisbeth M.; Karlsmose, Bodil

    1996-01-01

    Electrodialytic remediation of heavy metal polluted solid waste is a method that combines the technique of electrodialysis with the electromigration of ions in the solid waste. Results of laboratory scale remediation experiments of soil are presented and considerations are given on how to secure...

  15. Why the American public supports twenty-first century learning.

    Science.gov (United States)

    Sacconaghi, Michele

    2006-01-01

    Aware that constituent support is essential to any educational endeavor, the AOL Time Warner Foundation (now the Time Warner Foundation), in conjunction with two respected national research firms, measured Americans' attitudes toward the implementation of twenty-first century skills. The foundation's national research survey was intended to explore public perceptions of the need for changes in the educational system, in school and after school, with respect to the teaching of twenty-first century skills. The author summarizes the findings of the survey, which were released by the foundation in June 2003. One thousand adults were surveyed by telephone, including African Americans, Latinos, teachers, and business executives. In general, the survey found that Americans believe today's students need a "basics-plus" education, meaning communication, technology, and critical thinking skills in addition to the traditional basics of reading, writing, and math. In fact, 92 percent of respondents stated that students today need different skills from those of ten to twenty years ago. Also, after-school programs were found to be an appropriate vehicle to teach these skills. Furthermore, the survey explored how well the public perceives schools to be preparing youth for the workforce and postsecondary education, which twenty-first century skills are seen as being taught effectively, and the level of need for after-school and summer programs. The survey results provide conclusive evidence of national support for basics-plus education. Thus, a clear opportunity exists to build momentum for a new model of education for the twenty-first century.

  16. Remediation strategies for rural territories contaminated by the Chernobyl accident

    International Nuclear Information System (INIS)

    Jacob, P.; Fesenko, S.; Firsakova, S.K.; Likhtarev, I.A.; Schotola, C.; Alexakhin, R.M.; Zhuchenko, Y.M.; Kovgan, L.; Sanzharova, N.I.; Ageyets, V.

    2001-01-01

    The objective of the present paper is to derive remediation strategies for rural settlements contaminated by the Chernobyl accident in which annual doses to a critical group still exceed 1 mSv. Extensive radioecological data have been collected for 70 contaminated settlements. A dose model based on these data resulted in estimates that are on average close to and a bit less than the official dose estimates ('catalogue doses') published by the responsible Ministries of Belarus, Russia and Ukraine. For eight remedial actions that can be applied on a large scale, effectiveness and costs have been assessed in light of their dependence on soil type, contamination level and on the degree of previous application of remedial actions. Remediation strategies were derived for each of the 70 settlements by choosing remedial actions with lowest costs per averted dose and with highest degree of acceptability among the farmers and local authorities until annual doses are assessed to fall below 1 mSv. The results were generalised to 11 contamination/internal-dose categories. The total numbers of rural inhabitants and privately owned cows in the three countries distributed over the categories were determined and predicted until the year 2015. Based on these data, costs and averted doses were derived for the whole affected population. The main results are (i) about 2000 Sv can be averted at relatively low costs, (ii) the emphasis on reducing external exposures should be increased, (iii) radical improvement of hay-land and meadows and application of Prussian blue to cows should be performed on a large scale if annual doses of 1 mSv are an aim to be achieved, (iv) additional remedial actions of importance are fertilising of potato fields, distribution of food monitors and restriction of mushroom consumption, and (v) for inhabitants of some settlements (in total about 8600) annual doses cannot be reduced below 1 mSv by the remedial actions considered

  17. Remediating a design tool

    DEFF Research Database (Denmark)

    Jensen, Mads Møller; Rädle, Roman; Klokmose, Clemens N.

    2018-01-01

    digital sticky notes setup. The paper contributes with a nuanced understanding of what happens when remediating a physical design tool into digital space, by emphasizing focus shifts and breakdowns caused by the technology, but also benefits and promises inherent in the digital media. Despite users......' preference for creating physical notes, handling digital notes on boards was easier and the potential of proper documentation make the digital setup a possible alternative. While the analogy in our remediation supported a transfer of learned handling, the users' experiences across technological setups impact......Sticky notes are ubiquitous in design processes because of their tangibility and ease of use. Yet, they have well-known limitations in professional design processes, as documentation and distribution are cumbersome at best. This paper compares the use of sticky notes in ideation with a remediated...

  18. Alternative Remedies

    Science.gov (United States)

    ... Home › Aging & Health A to Z › Alternative Remedies Font ... medical treatment prescribed by their healthcare provider. Using this type of alternative therapy along with traditional treatments is ...

  19. Case study of an approved corrective action integrating active remediation with intrinsic remediation

    International Nuclear Information System (INIS)

    Teets, D.B.; Guest, P.R.; Blicker, B.R.

    1996-01-01

    Parsons Engineering Science, Inc., performed UST removals and/or site assessments at UST system locations at a former US Air Force Base (AFB) in Denver, Colorado. Four UST systems, incorporating 17 USTs, were located within the petroleum, oils, and lubricants bulk storage yard (POL Yard) of the former AFB. During the tank removals and subsequent site investigations, petroleum hydrocarbon contamination was found in soils at each site. Significant releases from two of the UST systems resulted in a dissolved benzene, toluene, ethylbenzene, and xylenes (BTEX) plume in the groundwater, and smear-zone contamination of soils beneath the majority of the POL Yard. Because of the close proximity of the UST systems, and the presence of the groundwater plume beneath the POL Yard, a corrective action plan (CAP) was prepared that encompassed all four UST systems. An innovative, risk-based CAP integrated active remediation of petroleum-contaminated soils with intrinsic remediation of groundwater. A natural attenuation evaluation for the dissolved BTEX was performed to demonstrate that natural attenuation processes are providing adequate remediation of groundwater and to predict the fate of the groundwater plume. BTEX concentrations versus distance were regressed to obtain attenuation rates, which were then used to calculate BTEX degradation rates using a one-dimensional, steady-state analytical solution. Additionally, electron acceptor concentrations in groundwater were compared to BTEX concentrations to provide evidence that natural attenuation of BTEX compounds was occurring. The natural attenuation evaluation was used in the CAP to support the intrinsic remediation with long-term monitoring alternative for groundwater, thereby avoiding the installation of an expensive groundwater remediation system

  20. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  1. RCRA corrective action ampersand CERCLA remedial action reference guide

    International Nuclear Information System (INIS)

    1994-07-01

    This reference guide provides a side-by-side comparison of RCRA corrective action and CERCLA Remedial Action, focusing on the statutory and regulatory requirements under each program, criterial and other factors that govern a site's progress, and the ways in which authorities or requirements under each program overlap and/or differ. Topics include the following: Intent of regulation; administration; types of sites and/or facilities; definition of site and/or facility; constituents of concern; exclusions; provisions for short-term remedies; triggers for initial site investigation; short term response actions; site investigations; remedial investigations; remedial alternatives; clean up criterial; final remedy; implementing remedy; on-site waste management; completion of remedial process

  2. Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action

    International Nuclear Information System (INIS)

    1994-09-01

    The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section

  3. Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

  4. IAEA Remediation Mission to Japan Concludes

    International Nuclear Information System (INIS)

    2011-01-01

    classifying removed materials that do not warrant special radiation protection measures as ''radioactive waste''; - Japan is advised to consider explaining to the public the importance of focusing on radiation doses that may actually be received by people rather than on data indicating contamination levels; and - Japan is encouraged to continue its remediation efforts. In doing so, Japan is encouraged to take into account the advice provided by the Mission. The IAEA stands ready to support Japan as it considers new and appropriate criteria for such activities. The authorities and local residents in Japan fully assisted the IAEA international team in its endeavor to conclude its mission successfully. ''The team also appreciates the openness with which our discussions were conducted and the high level of cooperation and access we were granted by Japan,'' says Mr. Lentijo. ''This was an invaluable opportunity for us to learn from this important decontamination initiative. We would like to continue our support to Japan in this very challenging task. We look forward to sharing our findings with the international community.'' The final report of the mission will be presented to the Government of Japan in the next month. Background. The accident at the Fukushima Dai-ichi Nuclear Power Plant has led to elevated levels of radiation over large areas. The Government of Japan has been formulating a strategy and plans to implement countermeasures to remediate these areas. The IAEA organized an International Fact Finding Expert Mission of the Fukushima Dai-ichi Nuclear Power Plant Accident Following The Great East Japan Earthquake and Tsunami, which took place between 24 May and 2 June 2011. The mission concluded today is a follow-up to the fact-finding mission held earlier in the year and an essential component of the IAEA's Nuclear Safety Action Plan, approved by the IAEA Board of Governors on 13 September and endorsed by all 151 Member States at the recent IAEA General Conference in

  5. 40 CFR 761.61 - PCB remediation waste.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false PCB remediation waste. 761.61 Section... PROHIBITIONS Storage and Disposal § 761.61 PCB remediation waste. This section provides cleanup and disposal options for PCB remediation waste. Any person cleaning up and disposing of PCBs managed under this section...

  6. Increased Prevalence of Dental Fluorosis after Twenty Years

    DEFF Research Database (Denmark)

    Richards, Alan; Larsen, Mogens Joost; Maare, L.

    2006-01-01

    tooth types in children born and reared in an area with drinking water with (regularly monitored, naturally-occurring) fluoride concentrations of 1 ppm and compare with data recorded for a similar group of children examined in the same way and residing in the same area 20 years ago. Methods: Dental...... children, of similar ages, examined in the same area in 1984. Results: The prevalence and severity of fluorosis varied between tooth types so that the later in childhood the teeth are mineralized the higher the prevalence of dental fluorosis. When the data were compared to those collected 20 years...... in the (later formed) premolars and second molars. Conclusions: A significant increase in fluorosis prevalence has occurred over the last 20 years due to increased fluoride exposure of pre-school children. These findings may be explained by increased use of fluoride toothpaste by this age group from...

  7. Integrating GIS and GPS in environmental remediation oversight

    International Nuclear Information System (INIS)

    Kaletsky, K.; Earle, J.R.; Schneider, T.A.

    1996-01-01

    This paper presents findings on Ohio EPA Office of Federal Facilities Oversight's (OFFO) use of GIS and GPS for environmental remediation oversight at the U.S. Department of Energy's (DOE) Fernald Site. The Fernald site is a former uranium metal production facility within DOE's nuclear weapons complex. Significant uranium contamination of soil and groundwater is being remediated under state and federal regulations. OFFO uses GIS/GPS to enhance environmental monitoring and remediation oversight. These technologies are utilized within OFFO's environmental monitoring program for sample location and parameter selection, data interpretation and presentation. GPS is used to integrate sample data into OFFO's GIS and for permanently linking precise and accurate geographic data to samples and waste units. It is important to identify contamination geographically as all visual references (e.g., buildings, infrastructure) will be removed during remediation. Availability of the GIS allows OFFO to perform independent analysis and review of DOE contractor generated data, models, maps, and designs. This ability helps alleviate concerns associated with open-quotes black boxclose quotes models and data interpretation. OFFO's independent analysis has increased regulatory confidence and the efficiency of design reviews. GIS/GPS technology allows OFFO to record and present complex data in a visual format aiding in stakeholder education and awareness. Presented are OFFO's achievements within the aforementioned activities and some reasons learned in implementing the GIS/GPS program. OFFO's two years of GIS/GPS development have resulted in numerous lessons learned and ideas for increasing effectiveness through the use of GIS/GPS

  8. Using biochar for remediation of soils contaminated with heavy metals and organic pollutants.

    Science.gov (United States)

    Zhang, Xiaokai; Wang, Hailong; He, Lizhi; Lu, Kouping; Sarmah, Ajit; Li, Jianwu; Bolan, Nanthi S; Pei, Jianchuan; Huang, Huagang

    2013-12-01

    Soil contamination with heavy metals and organic pollutants has increasingly become a serious global environmental issue in recent years. Considerable efforts have been made to remediate contaminated soils. Biochar has a large surface area, and high capacity to adsorb heavy metals and organic pollutants. Biochar can potentially be used to reduce the bioavailability and leachability of heavy metals and organic pollutants in soils through adsorption and other physicochemical reactions. Biochar is typically an alkaline material which can increase soil pH and contribute to stabilization of heavy metals. Application of biochar for remediation of contaminated soils may provide a new solution to the soil pollution problem. This paper provides an overview on the impact of biochar on the environmental fate and mobility of heavy metals and organic pollutants in contaminated soils and its implication for remediation of contaminated soils. Further research directions are identified to ensure a safe and sustainable use of biochar as a soil amendment for remediation of contaminated soils.

  9. Annual status report on the inactive uranium mill tailings sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Assessments of inactive uranium mill tailings sites in the United States led to the designation of 25 processing sites for remedial action under the provisions of Section 102(a) Public Law 95-604. The Department of Energy assessed the potential health effects to the public from the residual radioactive materials on or near the 25 sites; and, with the advice of the Environmental Protection Agency, the Secretary established priorities for performing remedial action. In designating the 25 sites and establishing the priorities for performing remedial action, the Department of Energy consulted with the Environmental Protection Agency, Nuclear Regulatory Commission, Department of the Interior, governors of the affected States, Navajo Nation, and appropriate property owners. Public participation in this process was encouraged. During Fiscal Year 1980, Department of Energy will be conducting surveys to verify the radiological characterization at the designated processing sites; developing cooperative agreements with the affected States; and initiating the appropriate National Environmental Policy Act documentation prior to conducting specific remedial actions.

  10. Remediation of contaminated soils by biotechnology with nanomaterials: bio-behavior, applications, and perspectives.

    Science.gov (United States)

    Gong, Xiaomin; Huang, Danlian; Liu, Yunguo; Peng, Zhiwei; Zeng, Guangming; Xu, Piao; Cheng, Min; Wang, Rongzhong; Wan, Jia

    2018-05-01

    Soil contamination caused by heavy metals and organic pollutants has drawn world-wide concern. Biotechnology has been applied for many years to the decontamination of soils polluted with organic and inorganic contaminants, and novel nanomaterials (NMs) has attracted much concern due to their high capacity for the removal/stabilization/degradation of pollutants. Recently, developing advanced biotechnology with NMs for the remediation of contaminated soils has become a hot research topic. Some researchers found that bioremediation efficiency of contaminated soils was enhanced by the addition of NMs, while others demonstrated that the toxicity of NMs to the organism negatively influenced the repair capacity of polluted soils. This paper reviews the application of biotechnology and NMs in soil remediation, and further provides a critical view of the effects of NMs on the phytoremediation and micro-remediation of contaminated soils. This review also discusses the future research needs for the combined application of biotechnology and NMs in soil remediation.

  11. Electrodialytic remediation of suspended mine tailings

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Rojo, Adrian; Pino, Denisse

    2008-01-01

    This work shows the laboratory results of nine electrodialytic remediation experiments on copper mine tailings. A newly designed remediation cell, where the solids were kept in suspension by airflow, was tested. The results show that electric current could remove copper from suspended tailings...... efficiency from 1% to 80% compared to experiments with no stirring but with the same operational conditions. This showed the crucial importance of having the solids in suspension and not settled during the remediation....

  12. DEMONSTRATION OF ELECTROCHEMICAL REMEDIATION TECHNOLOGIES-INDUCED COMPLEXATION

    Energy Technology Data Exchange (ETDEWEB)

    Barry L. Burks

    2002-12-01

    The Project Team is submitting this Topical Report on the results of its bench-scale demonstration of ElectroChemical Remediation Technologies (ECRTs) and in particular the Induced Complexation (ECRTs-IC) process for remediation of mercury contaminated soils at DOE Complex sites. ECRTs is an innovative, in-situ, geophysically based soil remediation technology with over 50 successful commercial site applications involving remediation of over two million metric tons of contaminated soils. ECRTs-IC has been successfully used to remediate 220 cu m of mercury-contaminated sediments in the Union Canal, Scotland. In that operation, ECRTs-IC reduced sediment total mercury levels from an average of 243 mg/kg to 6 mg/kg in 26 days of operation. The clean up objective was to achieve an average total mercury level in the sediment of 20 mg/kg.

  13. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  14. Program overview: Remedial actions at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Bates, L.D.; Trabalka, J.R.

    1988-01-01

    Research on and development of civilian and defense uses of nuclear materials and technologies have occurred at Oak Ridge National Laboratory (ORNL) since its creation as part of the World War II Manhattan Project in 1943. A diverse legacy of contaminated inactive facilities, research areas, and waste management areas exists; many are candidates for remedial action. Most attention is focused on waste management sites which contain the bulk of ORNL's environmental contamination. A wide variety of liquid and solid wastes, primarily radioactive wastes or mixed wastes in which radioactivity was the principal hazardous constituent, have been disposed of on-site in the past 45 years. One potential approach to remedial problems at ORNL is to design primarily for control and decay in situ (during an institutional control period of 100 years or more) of intermediate-lived wastes such as 3 H, 90 Sr, and 137 Cs. Passive measures designed to provide greater long-term confinement (for example, in situ vitrification) could be exercised at sites contaminated with TRU wastes or high concentrations of hazardous constitutes. This approach would (a) provide a period sufficiently long for evaluation of the effectiveness of environmental processes and passive remedial measures in controlling the migration of long-lived materials, (b) allow additional time needed for development of new technologies for more permanent site stabilization, and (c) reduce the need for immediate implementation of the more-expensive exhumation and disposal option

  15. Remediation in Practicing Physicians: Current and Alternative Conceptualizations.

    Science.gov (United States)

    Bourgeois-Law, Gisèle; Teunissen, Pim W; Regehr, Glenn

    2018-04-24

    Suboptimal performance in practicing physicians is a decades-old problem. The lack of a universally accepted definition of remediation, the paucity of research on best remediation practices, and the ongoing controversy regarding the institutional responsibility for enacting and overseeing this activity suggests that the remediation of physicians is not merely a difficult problem to solve, but a problem that the community does not grapple with meaningfully. Undoubtedly, logistical and political considerations contribute to this state of affairs; however, other underlying conceptual issues may also play a role in the medical profession's difficulties in engaging with the challenges around remediation.Through a review of the medical education and other literatures, the authors examined current conceptualizations of both remediation itself and the individual being remediated, as well as how the culture of medicine influences these conceptions. The authors explored how conceptualizations of remediation and the surrounding culture might affect not only the medical community's ability to support, but also its willingness to engage with physicians in need of remediation.Viewing remediation as a means of supporting practice change-rather than as a means of redressing gaps in knowledge and skill-might be a useful alternative conceptualization, providing a good place to start exploring new avenues of research. However, moving forward will require more than simply a reconceptualizion of remediation; it will also necessitate a change in how the community views its struggling members and a change in the medical culture that currently positions professional autonomy as the foundational premise for individual practice improvement.

  16. Tank waste remediation system (TWRS) privatization contractor samples waste envelope D material 241-C-106

    Energy Technology Data Exchange (ETDEWEB)

    Esch, R.A.

    1997-04-14

    This report represents the Final Analytical Report on Tank Waste Remediation System (TWRS) Privatization Contractor Samples for Waste Envelope D. All work was conducted in accordance with ''Addendum 1 of the Letter of Instruction (LOI) for TWRS Privatization Contractor Samples Addressing Waste Envelope D Materials - Revision 0, Revision 1, and Revision 2.'' (Jones 1996, Wiemers 1996a, Wiemers 1996b) Tank 241-C-1 06 (C-106) was selected by TWRS Privatization for the Part 1A Envelope D high-level waste demonstration. Twenty bottles of Tank C-106 material were collected by Westinghouse Hanford Company using a grab sampling technique and transferred to the 325 building for processing by the Pacific Northwest National Laboratory (PNNL). At the 325 building, the contents of the twenty bottles were combined into a single Initial Composite Material. This composite was subsampled for the laboratory-scale screening test and characterization testing, and the remainder was transferred to the 324 building for bench-scale preparation of the Privatization Contractor samples.

  17. The remediation of heavy metals contaminated sediment.

    Science.gov (United States)

    Peng, Jian-Feng; Song, Yong-Hui; Yuan, Peng; Cui, Xiao-Yu; Qiu, Guang-Lei

    2009-01-30

    Heavy metal contamination has become a worldwide problem through disturbing the normal functions of rivers and lakes. Sediment, as the largest storage and resources of heavy metal, plays a rather important role in metal transformations. This paper provides a review on the geochemical forms, affecting factors and remediation technologies of heavy metal in sediment. The in situ remediation of sediment aims at increasing the stabilization of some metals such as the mobile and the exchangeable fractions; whereas, the ex situ remediation mainly aims at removing those potentially mobile metals, such as the Mn-oxides and the organic matter (OM) fraction. The pH and OM can directly change metals distribution in sediment; however oxidation-reduction potential (ORP), mainly through changing the pH values, indirectly alters metals distribution. Mainly ascribed to their simple operation mode, low costs and fast remediation effects, in situ remediation technologies, especially being fit for slight pollution sediment, are applied widely. However, for avoiding metal secondary pollution from sediment release, ex situ remediation should be the hot point in future research.

  18. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords

  19. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  20. Remediation of PAH-contaminated soil using Achromobacter sp

    International Nuclear Information System (INIS)

    Cutright, T.J.; Lee, S.

    1994-01-01

    Several technologies have the potential to effectively remediate soil contaminated with polycyclic aromatic hydrocarbons (PAHs): solvent extraction, coal-oil agloflotation, supercritical extraction, and bioremediation. Due to the cost effectiveness and in-situ treatment capabilities of bioremediation, studies were conducted to determine the efficiency of Achromobacter sp. to remediate an industrial contaminated soil sample. Specifically, the use of three different mineral salt solutions in conjunction with the Achromobacter sp. was investigated. The molecular identification of the contaminants and their respective levels after remediation were determined using a Hewlett-Packard 1050 HPLC. Preliminary results show a 92% remediation for the use of two of the mineral salt solutions after 20 days' treatment. After 8 weeks, the remediation efficiency reached 99%. Bioremediation was also critically compared to the other potential remediation technologies

  1. Key Principles of Superfund Remedy Selection

    Science.gov (United States)

    Guidance on the primary considerations of remedy selection which are universally applicable at Superfund sites. Key guidance here include: Rules of Thumb for Superfund Remedy Selection and Role of the Baseline Risk Assessment.

  2. Office of Technology Development integrated program for development of in situ remediation technologies

    International Nuclear Information System (INIS)

    Peterson, M.

    1992-08-01

    The Department of Energy's Office of Technology Development has instituted an integrated program focused on development of in situ remediation technologies. The development of in situ remediation technologies will focus on five problem groups: buried waste, contaminated soils, contaminated groundwater, containerized wastes and underground detonation sites. The contaminants that will be included in the development program are volatile and non volatile organics, radionuclides, inorganics and highly explosive materials as well as mixtures of these contaminants. The In Situ Remediation Integrated Program (ISR IP) has defined the fiscal year 1993 research and development technology areas for focusing activities, and they are described in this paper. These R ampersand D topical areas include: nonbiological in situ treatment, in situ bioremediation, electrokinetics, and in situ containment

  3. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    International Nuclear Information System (INIS)

    Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.

    2013-01-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  4. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    Energy Technology Data Exchange (ETDEWEB)

    Beres, Christopher M.; Fort, E. Joseph [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States); Boyle, James D. [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)

    2013-07-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  5. Technology Education: Twenty-five years of progress

    OpenAIRE

    Miranda, Michael A. De; Miyakawa, Hidetoshi

    2005-01-01

    The past 25 years has brought significant changes in the field of technology education. Contributing to these changes has been the evolution of a curriculum from the early days of industrial arts that addressed human productive practice to an emerging contemporary technological curriculum shaped by the exponential growth of technology and its impact on the extension of human capabilities, society, and the environment. The recent literature that focuses on the exponential growth of technology ...

  6. Visual impairment from uveitis in a reference hospital of Southeast Brazil: a retrospective review over a twenty years period.

    Science.gov (United States)

    Silva, Luci Meire Pereira da; Muccioli, Cristina; Oliveira, Filipe de; Arantes, Tiago Eugênio; Gonzaga, Lucas Renó; Nakanami, Célia Regina

    2013-01-01

    To identify the frequency and causes of uveitis leading to visual impairment in patients referred to the Low Vision Service - Department of Ophthalmology - UNIFESP, over a twenty years period. In a retrospective study, medical records of 5,461 patients were reviewed. Data from the first clinical evaluation at the Low Vision Service were collected, patient's age, gender and cause of visual impairment were analyzed. Patients with uveitis had their chart reviewed for anatomical classification and clinical diagnosis. The mean age of the patients referred to the Low Vision Service was 42.86 years and the mean age of patients with uveitis diagnosis was 25.51 years. Retinal disorders were the most common cause of visual impairment (N=2,835 patients; 51.9%) followed by uveitis (862 patients, 15.7%). Uveitis was posterior in 792 patients (91.9% of uveitis) and toxoplasmosis was the most common diagnosis (765 patients, 88.7%). In our study, uveitis represents the second cause of visual impairment in patients referred for visual rehabilitation and toxoplasmic retinochoroiditis was the most common clinical diagnosis. It affects a young working age population with a relevant social and economic impact, but the early diagnosis and treatment can improve the quality of life of these patients.

  7. Wearable Cameras Are Useful Tools to Investigate and Remediate Autobiographical Memory Impairment: A Systematic PRISMA Review.

    Science.gov (United States)

    Allé, Mélissa C; Manning, Liliann; Potheegadoo, Jevita; Coutelle, Romain; Danion, Jean-Marie; Berna, Fabrice

    2017-03-01

    Autobiographical memory, central in human cognition and every day functioning, enables past experienced events to be remembered. A variety of disorders affecting autobiographical memory are characterized by the difficulty of retrieving specific detailed memories of past personal events. Owing to the impact of autobiographical memory impairment on patients' daily life, it is necessary to better understand these deficits and develop relevant methods to improve autobiographical memory. The primary objective of the present systematic PRISMA review was to give an overview of the first empirical evidence of the potential of wearable cameras in autobiographical memory investigation in remediating autobiographical memory impairments. The peer-reviewed literature published since 2004 on the usefulness of wearable cameras in research protocols was explored in 3 databases (PUBMED, PsycINFO, and Google Scholar). Twenty-eight published studies that used a protocol involving wearable camera, either to explore wearable camera functioning and impact on daily life, or to investigate autobiographical memory processing or remediate autobiographical memory impairment, were included. This review analyzed the potential of wearable cameras for 1) investigating autobiographical memory processes in healthy volunteers without memory impairment and in clinical populations, and 2) remediating autobiographical memory in patients with various kinds of memory disorder. Mechanisms to account for the efficacy of wearable cameras are also discussed. The review concludes by discussing certain limitations inherent to using cameras, and new research perspectives. Finally, ethical issues raised by this new technology are considered.

  8. Predictors of change in life skills in schizophrenia after cognitive remediation.

    Science.gov (United States)

    Kurtz, Matthew M; Seltzer, James C; Fujimoto, Marco; Shagan, Dana S; Wexler, Bruce E

    2009-02-01

    Few studies have investigated predictors of response to cognitive remediation interventions in patients with schizophrenia. Predictor studies to date have selected treatment outcome measures that were either part of the remediation intervention itself or closely linked to the intervention with few studies investigating factors that predict generalization to measures of everyday life-skills as an index of treatment-related improvement. In the current study we investigated the relationship between four measures of neurocognitive function, crystallized verbal ability, auditory sustained attention and working memory, verbal learning and memory, and problem-solving, two measures of symptoms, total positive and negative symptoms, and the process variables of treatment intensity and duration, to change on a performance-based measure of everyday life-skills after a year of computer-assisted cognitive remediation offered as part of intensive outpatient rehabilitation treatment. Thirty-six patients with schizophrenia or schizoaffective disorder were studied. Results of a linear regression model revealed that auditory attention and working memory predicted a significant amount of the variance in change in performance-based measures of everyday life skills after cognitive remediation, even when variance for all other neurocognitive variables in the model was controlled. Stepwise regression revealed that auditory attention and working memory predicted change in everyday life-skills across the trial even when baseline life-skill scores, symptoms and treatment process variables were controlled. These findings emphasize the importance of sustained auditory attention and working memory for benefiting from extended programs of cognitive remediation.

  9. Cardiac myxoma: diagnostic approach, surgical treatment and follow-up. A twenty years experience.

    Science.gov (United States)

    Jelic, J; Milicić, D; Alfirević, I; Anić, D; Baudoin, Z; Bulat, C; Corić, V; Dadić, D; Husar, J; Ivanćan, V; Korda, Z; Letica, D; Predrijevac, M; Ugljen, R; Vućemilo, I

    1996-12-01

    At the University Department of Cardiovascular Surgery in Zagreb, Croatia, we treated 81 patients with primary intracardiac myxoma, in a period from January 1975 to December 1994. There were 55 female and 26 male pts, in age from 1 month to 80 years, mean 46+/-15 years. Clinical manifestations varied from no symptoms and very poor or no clinical signs to various manifestations of chronic or acute congestive heart failure, syncope and arrhythmias with or without systemic findings such as high erythrocyte sedimentation rate, anaemia, leucocytosis, elevated gamma globulin, thrombocytopenia or low grade fever, as well as cerebrovascular accidents due to tumour embolization. Cardiac symptoms were predominant in 54 pts (66.6%) and cerebrovascular in 20 pts (24.7%). Seven pts (8.6%) were symptomless and discovered accidentally, mostly regarding on an unexplained heart murmur. In almost all the patients preoperative diagnosis of intracardiac myxoma was sufficiently established by echocardiography. The tumour was located in the left atrium in 62 pts (76.5%) and in the right atrium in 19 pts (23.5%). Delay from the onset of symptoms to the diagnosis was 6 months in average (range 10 days to 25 months). The average waiting for the operation was 9 days (range from 1 to 60 days). The echocardiographic diagnosis was confirmed during intraoperative examination followed by histological analysis. All pts underwent excision of myxoma using cardiopulmonary bypass with core and topical hypothermia and cold crystaloid cardioplegia. According to the additional preoperative and intraoperative findings, in 6 pts sinchronous mitral valve reconstruction, in 3 pts artificial mitral valve implantation and in 2 pts atrial wall reconstruction was performed. There was no perioperative mortality. After the operation, we could not evaluate all the patients long enough, mostly because of some paramedical circumstancies, such as war, migrations, etc. Twenty two pts undevent evaluation for at least 5

  10. Remediation of former uranium mining and milling facilities in Germany - the WISMUT experience

    International Nuclear Information System (INIS)

    Gatzweiler, R.

    2000-01-01

    The former German Democratic Republic (East Germany) provided most of the natural uranium for the nuclear programmes of the former Soviet Union. Uranium mining and milling activities caused extensive devastation and resulted in large amounts of waste with serious impacts on the environment and unacceptable risks to human health. Production ceased in 1990-91 in the course of the reunification of Germany. At the same time a very large environmental remediation programme was initiated by the German Federal Government. WISMUT GmbH, the successor company of the former Soviet-German enterprise SDAG WISMUT, was designated to carry out this DM 13 billion programme. The programme is currently in its ninth year and will likely continue up to 2015. The initial assessment of the remediation and the cost estimates were based on closure plans for the mining and milling facilities, an extensive environmental database and basic concepts for site specific remediation in accordance with legal requirements and directives. The decision making process for individual remediation objects is based on risk analyses and the evaluation of remediation options. The methodologies used depend on the size and complexity of the individual object. For simple cases, an environmental assessment study is used. Remediation options for larger and more complex objects such as tailings facilities are evaluated by multi-attribute analysis with emphasis on sensitivity investigations. The general public is not formally involved in the decision making process but is informed on conceptual remediation plans for the individual sites. These plans are regularly updated. For several of the remediated facilities, future use cannot be unrestricted and therefore, some form of institutional control is needed. To date, criteria for close-out have not been clearly defined for all sites. Similarly, criteria concerning transfer of ownership and responsibilities for long term surveillance and maintenance have yet to be

  11. What's the point? The contribution of a sustainability view in contaminated site remediation.

    Science.gov (United States)

    Anderson, Robert; Norrman, Jenny; Back, Pär-Erik; Söderqvist, Tore; Rosén, Lars

    2018-07-15

    Decision support tools (DST) are often used in remediation projects to aid in the complex decision on how best to remediate a contaminated site. In recent years, the sustainable remediation concept has brought increased attention to the often-overlooked contradictory effects of site remediation, with a number of sustainability assessment tools now available. The aim of the present study is twofold: (1) to demonstrate how and when different assessment views affect the decision support outcome on remediation alternatives in a DST, and (2) to demonstrate the contribution of a full sustainability assessment. The SCORE tool was used in the analysis; it is based on a holistic multi-criteria decision analysis (MCDA) approach, assessing sustainability in three dimensions: environmental, social, and economic. Four assessment scenarios, compared to a full sustainability assessment, were considered to reflect different possible assessment views; considering public and private problem owner perspectives, as well as green and traditional assessment scopes. Four real case study sites in Sweden were analyzed. The results show that the decision support outcome from a full sustainability assessment most often differs to that of other assessment views, and results in remediation alternatives which balance trade-offs in most of the scenarios. In relation to the public perspective and traditional scope, which is seen to lead to the most extensive and expensive remediation alternatives, the trade-off is related to less contaminant removal in favour of reduced negative secondary effects such as emissions and waste disposal. Compared to the private perspective, associated with the lowest cost alternatives, the trade-off is higher costs, but more positive environmental and social effects. Generally, both the green and traditional assessment scopes miss out on relevant social and local environmental secondary effects which may ultimately be very important for the actual decision in a

  12. Biological technologies for the remediation of co-contaminated soil.

    Science.gov (United States)

    Ye, Shujing; Zeng, Guangming; Wu, Haipeng; Zhang, Chang; Dai, Juan; Liang, Jie; Yu, Jiangfang; Ren, Xiaoya; Yi, Huan; Cheng, Min; Zhang, Chen

    2017-12-01

    Compound contamination in soil, caused by unreasonable waste disposal, has attracted increasing attention on a global scale, particularly since multiple heavy metals and/or organic pollutants are entering natural ecosystem through human activities, causing an enormous threat. The remediation of co-contaminated soil is more complicated and difficult than that of single contamination, due to the disparate remediation pathways utilized for different types of pollutants. Several modern remediation technologies have been developed for the treatment of co-contaminated soil. Biological remediation technologies, as the eco-friendly methods, have received widespread concern due to soil improvement besides remediation. This review summarizes the application of biological technologies, which contains microbial technologies (function microbial remediation and composting or compost addition), biochar, phytoremediation technologies, genetic engineering technologies and biochemical technologies, for the remediation of co-contaminated soil with heavy metals and organic pollutants. Mechanisms of these technologies and their remediation efficiencies are also reviewed. Based on this study, this review also identifies the future research required in this field.

  13. Environmental Remediation to Address Childhood Lead Poisoning Epidemic due to Artisanal Gold Mining in Zamfara, Nigeria.

    Science.gov (United States)

    Tirima, Simba; Bartrem, Casey; von Lindern, Ian; von Braun, Margrit; Lind, Douglas; Anka, Shehu Mohammed; Abdullahi, Aishat

    2016-09-01

    From 2010 through 2013, integrated health and environmental responses addressed an unprecedented epidemic lead poisoning in Zamfara State, northern Nigeria. Artisanal gold mining caused widespread contamination resulting in the deaths of > 400 children. Socioeconomic, logistic, and security challenges required remediation and medical protocols within the context of local resources, labor practices, and cultural traditions. Our aim was to implement emergency environmental remediation to abate exposures to 17,000 lead poisoned villagers, to facilitate chelation treatment of children ≤ 5 years old, and to establish local technical capacity and lead health advocacy programs to prevent future disasters. U.S. hazardous waste removal protocols were modified to accommodate local agricultural practices. Remediation was conducted over 4 years in three phases, progressing from an emergency response by international personnel to comprehensive cleanup funded and accomplished by the Nigerian government. More than 27,000 m3 of contaminated soils and mining waste were removed from 820 residences and ore processing areas in eight villages, largely by hand labor, and disposed in constructed landfills. Excavated areas were capped with clean soils (≤ 25 mg/kg lead), decreasing soil lead concentrations by 89%, and 2,349 children received chelation treatment. Pre-chelation geometric mean blood lead levels for children ≤ 5 years old decreased from 149 μg/dL to 15 μg/dL over the 4-year remedial program. The unprecedented outbreak and response demonstrate that, given sufficient political will and modest investment, the world's most challenging environmental health crises can be addressed by adapting proven response protocols to the capabilities of host countries. Tirima S, Bartrem C, von Lindern I, von Braun M, Lind D, Anka SM, Abdullahi A. 2016. Environmental remediation to address childhood lead poisoning epidemic due to artisanal gold mining in Zamfara, Nigeria. Environ Health

  14. Radon remedial actions in schools of Friuli Venezia Giulia region (NE Italy)

    International Nuclear Information System (INIS)

    Giovani, C.; Cappelletto, C.; Garavaglia, M.; Pividore, S.; Villalta, R.

    2004-01-01

    In the last four years the Regional Agency of Environmental Protection (ARPA) of Friuli Venezia Giulia carried out a survey to determine the radon concentration in the schools of the area. During the survey all the 1320 schools and kindergartens of the region were investigated with more than 5000 measurements. In about 2% of cases, radon concentrations exceeded the reference levels of Italian law and remedial actions were performed. In collaboration with the Building Engineering Department of Udine University, ARPA FVG edited a manual concerning indications and proposals for building protection against radon. The environmental physics section of ARPA FVG, was heavily involved in the remedial action, both in the design of the action and in the investigation of effectiveness. In more than 20 schools the owners following ARPA indications solved the problem of high radon concentrations. In this paper the authors report the main type of applied remedial actions grouped taking into account the different remedial methodology. In Friuli Venezia Giulia region the main radon source is represented by soil. The contribution of building materials to high radon concentrations is negligible. The most common remedial actions consisted in natural or artificial depressurization of the soil or the crawlspace with respect to indoor building. Sometimes air was pumped into the building or air exchange number was increased. The authors show in detail the design of the performed investigations: these involved different measurement sets with passive electrets and active instruments for continuous data collection. Measurements usually last 3 contiguous weeks and are followed by long period measurements with solid track detectors. Optimization of remedial action performance was investigated when remedial action consisted in active air extraction from the soil under the buildings and fan time regulation was possible. Very often simple and cheap actions allowed a reduction of 90% in radon

  15. Guidelines for Remediation Strategies to Reduce the Radiological Consequences of Environmental Contamination

    Energy Technology Data Exchange (ETDEWEB)

    Fesenko, S; Howard, B J [eds.

    2012-11-15

    There are many areas around the world contaminated with radioactive substances which may require remediation. The source of contamination with radionuclides varies; the most important sources include nuclear testing, radiation accidents and inadequate waste disposal practices. Contamination at such sites may present a risk to humans and the environment. Therefore, issues related to remediation of such sites are potentially of concern for both the general public and a wide variety of stakeholders. In response to the needs of its Member States, the IAEA has published many books covering different aspects of remediation of contaminated environments. These books range from safety fundamentals and safety requirements to technical publications describing remedial technologies. Almost all of the publications on environmental remediation are related to uranium mining areas and decommissioning of nuclear facilities. IAEA radiation safety standards on remediation of contaminated environments are largely based on these two types of remediation. The exception is a publication that was a joint undertaking by the IAEA and the Food and Agriculture Organization of the United Nations (FAO) related to accidents entitled Guidelines for Agricultural Countermeasures Following an Accidental Release of Radionuclides, Technical Reports Series No. 363 (1994) (TRS 363). This publication has constituted a major source of information over many years for staff of authorities providing environmental remediation planning after accidents. TRS 363 focused mainly on agricultural management options following an accidental release of radionuclides; remedial actions for other environments and other practices were not considered. Since the publication of TRS 363, there has been a considerable increase in relevant information. Given the importance of Chernobyl and other accidents, there have been a considerable number of IAEA activities devoted to the remediation of radiation accidents since 1994. Many

  16. Guidelines for Remediation Strategies to Reduce the Radiological Consequences of Environmental Contamination

    International Nuclear Information System (INIS)

    Fesenko, S.; Howard, B.J.

    2012-01-01

    There are many areas around the world contaminated with radioactive substances which may require remediation. The source of contamination with radionuclides varies; the most important sources include nuclear testing, radiation accidents and inadequate waste disposal practices. Contamination at such sites may present a risk to humans and the environment. Therefore, issues related to remediation of such sites are potentially of concern for both the general public and a wide variety of stakeholders. In response to the needs of its Member States, the IAEA has published many books covering different aspects of remediation of contaminated environments. These books range from safety fundamentals and safety requirements to technical publications describing remedial technologies. Almost all of the publications on environmental remediation are related to uranium mining areas and decommissioning of nuclear facilities. IAEA radiation safety standards on remediation of contaminated environments are largely based on these two types of remediation. The exception is a publication that was a joint undertaking by the IAEA and the Food and Agriculture Organization of the United Nations (FAO) related to accidents entitled Guidelines for Agricultural Countermeasures Following an Accidental Release of Radionuclides, Technical Reports Series No. 363 (1994) (TRS 363). This publication has constituted a major source of information over many years for staff of authorities providing environmental remediation planning after accidents. TRS 363 focused mainly on agricultural management options following an accidental release of radionuclides; remedial actions for other environments and other practices were not considered. Since the publication of TRS 363, there has been a considerable increase in relevant information. Given the importance of Chernobyl and other accidents, there have been a considerable number of IAEA activities devoted to the remediation of radiation accidents since 1994. Many

  17. Innovative technologies for the remediation of transuranic- contaminated landfills

    International Nuclear Information System (INIS)

    Kostelnik, K.M.

    1995-01-01

    The US Department of Energy (DOE) has initiated a comprehensive research,development, demonstration, testing and evaluation program to provide innovative technology systems to achieve its environmental management responsibilities. The Office of Technology Development (OTD) is responsible for this research in support of the Offices of Environmental Restoration and Waste Management efforts. In fiscal year (FY) 1992 the OTD established the Buried Waste Integrated Demonstration (BWID). The BWID mission was to support the development of emerging technologies for their application to the remediation of DOE buried waste site. During FY95, the BWID program was transitioned into a larger program which will focus its attention to DOE Landfills and Contaminated Soils. There search and activities formerly referred to as the BWID will now be associated with the Transuranic-contaminated Arid Landfill Stabilization Program.(TALS). The TALS Program supports these buried waste remediation efforts by seeking out the best talent to solve the technology challenges as identified in baseline remediation strategies. Experts from throughout the DOE complex, universities, private sector, and the international community are being included in this program to solve these challenges and ensure implementation and commercialization of innovative technologies

  18. Microbial strategy for potential lead remediation: a review study.

    Science.gov (United States)

    Pan, Xiaohong; Chen, Zhi; Li, Lan; Rao, Wenhua; Xu, Zhangyan; Guan, Xiong

    2017-02-01

    The extensive exploitation and usage of lead compounds result in severe lead(II) pollution in water and soil environments, even in agricultural land, threatening the health of animals and humans via food chains. The recovery and remediation of lead(II) from water and soil environments have been intensively concerned in recent years. Compared with the traditional physic-chemistry treatment, microbial remediation strategy is a promising alternative to remediate lead(II)-contaminated environments due to its cost-effective and environmentally-friendly properties. Various microorganisms are capable of removing or immobilizing lead(II) from water and soil environments through bioaccumulation, precipitation or accelerated transformation of lead(II) into a very stable mineral, resulting in significant effects on lead(II) mobility and bioavailability. In the present review, we investigated a wide diversity of lead(II) bioremediation induced by different microbes and its multi-mechanisms. Moreover, we also discussed the progress and limitations, summarized the common rules of lead(II)-microbe interaction, and evaluated the environmental significance of microbes in lead biogeochemistry process. In addition, we further deliberated the feasibility and potential application of microbes in developing cost-effective, eco-friendly bioremediation or long-term management strategy for lead(II) contaminated repositories.

  19. Technologies for remediating radioactively contaminated land

    International Nuclear Information System (INIS)

    Pearl, M.

    2000-01-01

    This paper gives an overview of technologies that can be used for the remediation of radioactively contaminated ground. There are a wide variety of techniques available -most have established track records for contaminated ground, though in general many are only just being adapted to use for radioactively contaminated ground. 1) Remediation techniques for radioactively contaminated ground involve either removal of the contamination and transfer to a controlled/contained facility such as the national LLW repository at Drigg, or 2) immobilization, solidification and stabilization of the contamination where the physical nature of the soil is changed, or an 'agent' is added to the soil, to reduce the migration of the contaminants, or 3) isolation and containment of the contaminated ground to reduce contaminant migration and control potential detrimental effects to human health. Where contamination has to be removed, ex situ and in situ techniques are available which minimize the waste requiring disposal to an LLW repository. These techniques include: 1) detector-based segregation 2) soil washing by particle separations 3) oil washing with chemical leaching agents 4) electro remediation 5) phyto remediation. Although many technologies are potentially applicable, their application to the remediation of a specific contaminated site is dependent on a number of factors and related to detailed site characterization studies, results from development trials and BPEO (best practicable environmental option) studies. Those factors considered of particular importance are: 1) the clean-up target 2) technical feasibility relative to the particular site, soil and contaminant characteristics, and time frame 3) site infrastructure arrangements and needs, the working life of the site and the duration of institutional care 4) long-term monitoring arrangements for slow remedial techniques or for immobilization and containment techniques 5) validation of the remediation 6) health and

  20. Twenty years of the Chernobyl accident: Results and problems in eliminating its consequences in Russia 1986-2006. Russian national report

    International Nuclear Information System (INIS)

    Gerasimova, N.V.; Marchenko, T.A.; Shoigu, S.K.; Bolshov, L.A.

    2006-01-01

    Twenty years after the Chernobyl accident, above 1.5 million people in 14 subjects of the Russian Federation continue to live in the area of radioactive contamination. More than 180,000 of the Russians were affected by radiation, when participating in elimination of the accident and its consequences. Since the first days of the accident, the public health service faced a task to develop and implement the measures on minimization of medical effects of the accident and public provision with medical assistance, including the employees of the nuclear power plant and the participants in mitigation of the accident. The health of the liquidators and the public living in the contaminated areas is the most socially significant issue being solved in the process of elimination of the Chernobyl consequences. Radiological effects have been the focus of attention for the overall 20-year period. The radiation protection system was based on performance of the two conditions, namely: absolute prevention of acute (deterministic) effects and reduction in the risk of remote (stochastic) effects to acceptable (justified) levels. As early as in 1986, a decision was made to create the unified system of medical observation for the individuals affected by radiation as a result of the Chernobyl accident. The Russian State Medical and Dosimetry Register (RSMDR) was established on the basis of the Medical Radiological Research Center of the Russian Academy of Medical Sciences. The two most suffered public groups were defined as a result of research activity of the Register. These are the children (at the moment of the accident) living in the highly contaminated areas and the liquidators who have obtained the exposure dose above 150 mGy. According to the Register's data, 122 cases (54%) out of 226 thyroid cancers revealed during the years 1991-2003 among the children (at the moment of the Chernobyl catastrophe) from the Bryansk region can be considered as radiation-stipulated. Hygienic

  1. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  2. SURF: Taking Sustainable Remediation from Concept to Standard Operating Procedure (Invited)

    Science.gov (United States)

    Smith, L. M.; Wice, R. B.; Torrens, J.

    2013-12-01

    Over the last decade, many sectors of industrialized society have been rethinking behavior and re-engineering practices to reduce consumption of energy and natural resources. During this time, green and sustainable remediation (GSR) has evolved from conceptual discussions to standard operating procedure for many environmental remediation practitioners. Government agencies and private sector entities have incorporated GSR metrics into their performance criteria and contracting documents. One of the early think tanks for the development of GSR was the Sustainable Remediation Forum (SURF). SURF brings together representatives of government, industry, consultancy, and academia to parse the means and ends of incorporating societal and economic considerations into environmental cleanup projects. Faced with decades-old treatment programs with high energy outputs and no endpoints in sight, a small group of individuals published the institutional knowledge gathered in two years of ad hoc meetings into a 2009 White Paper on sustainable remediation drivers, practices, objectives, and case studies. Since then, SURF has expanded on those introductory topics, publishing its Framework for Integrating Sustainability into Remediation Projects, Guidance for Performing Footprint Analyses and Life-Cycle Assessments for the Remediation Industry, a compendium of metrics, and a call to improve the integration of land remediation and reuse. SURF's research and members have also been instrumental in the development of additional guidance through ASTM International and the Interstate Technology and Regulatory Council. SURF's current efforts focus on water reuse, the international perspective on GSR (continuing the conversations that were the basis of SURF's December 2012 meeting at the National Academy of Sciences in Washington, DC), and ways to capture and evaluate the societal benefits of site remediation. SURF also promotes and supports student chapters at universities across the US

  3. Technology selection for remediation of lead and hydrocarbon contaminated soil

    International Nuclear Information System (INIS)

    Richardson, K.E.; Sparks, G.M.

    1993-01-01

    This paper presents a methodology for selection of a technology for remediation of 70,000 tons of lead and hydrocarbon impacted soil resulting from an excavation at the Mobil Torrance Refinery. This methodology resulted from over two years of extensive research and technology evaluation. Twelve technologies and combination of technologies were evaluated, which often included bench scale testing, to determine the most cost effective and technically feasible remediation option. The results of the studies for each technology are discussed and presented in tabular form. The technologies investigated include: fixation/stabilization, soil washing, solvent washing, heap leach extraction, froth flotation, bioremediation, thermal desorption, electrokinetic extraction, asphalt incorporation, vitrification, off-site treatment, and off-site disposal. The associated costs and technical feasibility of each of the remediation options evaluated are presented. Laboratory analyses of the excavated soil indicate hydrocarbons range from non-detect to 11,000 ppm with an average of 2,600 ppm, soluble lead (CA test-not TCLP) range from 1.4 ppm to 100 ppm with an average of 29 ppm, and low levels of organic lead are present. Average grain size of the soil ranges from number-sign 200 to number-sign 120 mesh, and permeability averages 10--4 cm/sec. Significant odors, likely caused by hydrogen sulfide and thiophenes, were detected when the soil was excavated and control of odors during the remediation phase is a critical concern

  4. Electrodialytic remediation of heavy metal polluted soil

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Jensen, Pernille Erland; Kirkelund, Gunvor Marie

    2012-01-01

    Electrodialytic soil remediation is a method for removal of heavy metals. Good results have previously been obtained with both treatment of a stationary, water saturated soil matrix and with remediation of a stirred suspension of soil in water. The two different setups have different uses....... The first as in-situ or on-site treatment when there is no requirement for fast remediation, as the removal rate of the heavy metals are dependent on the distance between the electrodes (everything else equal) and in such application the electrode spacing must have a certain distance (often meters......). In the stirred setup it is possible to shorten the transport route to few mm and to have a faster and continuous process. The present paper for the first time reports a direct comparison of the two options. The remediation of the stirred suspension showed faster than remediation of the water saturated soil even...

  5. Remediation of spent block in Uvanas deposit

    International Nuclear Information System (INIS)

    Nurgaziev, M.A.; Iskakov, M.M.

    2012-01-01

    In 2007 by 'Kazatomprom' and 'Mining company' board decision, the branch of 'Mining company', 'Steppe ore management body' is reorganized in structure subdivision, the basic activity of which is organization and carrying out remediation works on spent blocks of PSV uranium deposit. In 2002 works are completed on OVOS for operating deposits Uvanas, Kanjugan, Northern Karamurun and Eastern Minkuduk. The results of present work were reported in IAEA conference. The working project 'Remediation of spent blocks of PSV uranium deposit PV-17 polygon of Steppe ore management body' approved in 2005 was developed for carrying out the remediation works. Works funding were carried out from liquidation fund of the current deposit established in accordance with the Republic of Kazakhstan law 'About interior and interior use'. Deposits remediation is the part of deposit operation life cycle which obliges to operate deposits with minimum expenditures for remediation.

  6. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    International Nuclear Information System (INIS)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    2013-01-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  7. Rural areas affected by the Chernobyl accident: Radiation exposure and remediation strategies

    Energy Technology Data Exchange (ETDEWEB)

    Jacob, P., E-mail: Jacob@helmholtz-muenchen.de [Helmholtz Zentrum Muenchen, Institute of Radiation Protection, 85764 Neuherberg (Germany); Fesenko, S. [International Atomic Energy Agency, Vienna (Austria); Bogdevitch, I. [Scientific Research State Enterprise ' Institute for Soil Science and Agrochemistry' , Minsk (Belarus); Kashparov, V. [Ukrainian Institute of Agricultural Radiology, Chabany (Ukraine); Sanzharova, N. [Russian Institute of Agricultural Radiology and Radioecology, Obninsk (Russian Federation); Grebenshikova, N. [Institute of Radiology, Gomel (Belarus); Isamov, N. [Russian Institute of Agricultural Radiology and Radioecology, Obninsk (Russian Federation); Lazarev, N. [Ukrainian Institute of Agricultural Radiology, Chabany (Ukraine); Panov, A. [Russian Institute of Agricultural Radiology and Radioecology, Obninsk (Russian Federation); Ulanovsky, A. [Helmholtz Zentrum Muenchen, Institute of Radiation Protection, 85764 Neuherberg (Germany); Zhuchenko, Y. [Institute of Radiology, Gomel (Belarus); Zhurba, M. [Ukrainian Institute of Agricultural Radiology, Chabany (Ukraine)

    2009-12-15

    Main objectives of the present work were to develop an internationally agreed methodology for deriving optimized remediation strategies in rural areas that are still affected by the Chernobyl accident, and to give an overview of the radiological situation in the three affected countries, Belarus, Russia and Ukraine. Study settlements were defined by having in 2004 less than 10,000 inhabitants and official dose estimates exceeding 1 mSv. Data on population, current farming practices, contamination of soils and foodstuffs, and remedial actions previously applied were collected for each of such 541 study settlements. Calculations of the annual effective dose from internal radiation were validated with extensive data sets on whole body counter measurements. According to our calculations for 2004, in 290 of the study settlements the effective dose exceeded 1 mSv, and the collective dose in these settlements amounted to about 66 person-Sv. Six remedial actions were considered: radical improvement of grassland, application of ferrocyn to cows, feeding pigs with uncontaminated fodder before slaughter, application of mineral fertilizers for potato fields, information campaign on contaminated forest produce, and replacement of contaminated soil in populated areas by uncontaminated soil. Side effects of the remedial actions were quantified by a 'degree of acceptability'. Results are presented for two remediation strategies, namely, Strategy 1, in which the degree of acceptability was given a priority, and Remediation Strategy 2, in which remedial actions were chosen according to lowest costs per averted dose only. Results are highly country-specific varying from preference for soil replacement in populated areas in Belarus to preference for application of ferrocyn to cows in Ukraine. Remedial actions in 2010 can avert a large collective dose of about 150 person-Sv (including averted doses, which would be received in the following years). Nevertheless, the number of

  8. Physicochemical and biological quality of soil in hexavalent chromium-contaminated soils as affected by chemical and microbial remediation.

    Science.gov (United States)

    Liao, Yingping; Min, Xiaobo; Yang, Zhihui; Chai, Liyuan; Zhang, Shujuan; Wang, Yangyang

    2014-01-01

    Chemical and microbial methods are the main remediation technologies for chromium-contaminated soil. These technologies have progressed rapidly in recent years; however, there is still a lack of methods for evaluating the chemical and biological quality of soil after different remediation technologies have been applied. In this paper, microbial remediation with indigenous bacteria and chemical remediation with ferrous sulphate were used for the remediation of soils contaminated with Cr(VI) at two levels (80 and 1,276 mg kg(-1)) through a column leaching experiment. After microbial remediation with indigenous bacteria, the average concentration of water-soluble Cr(VI) in the soils was reduced to less than 5.0 mg kg(-1). Soil quality was evaluated based on 11 soil properties and the fuzzy comprehensive assessment method, including fuzzy mathematics and correlative analysis. The chemical fertility quality index was improved by one grade using microbial remediation with indigenous bacteria, and the biological fertility quality index increased by at least a factor of 6. Chemical remediation with ferrous sulphate, however, resulted in lower levels of available phosphorus, dehydrogenase, catalase and polyphenol oxidase. The result showed that microbial remediation with indigenous bacteria was more effective for remedying Cr(VI)-contaminated soils with high pH value than chemical remediation with ferrous sulphate. In addition, the fuzzy comprehensive evaluation method was proven to be a useful tool for monitoring the quality change in chromium-contaminated soils.

  9. Permeable reactive barrier - innovative technology for ground-water remediation

    International Nuclear Information System (INIS)

    Vidic, D.R.

    2002-01-01

    Significant advances in the application of permeable reactive barriers (PRBs) for ground-water remediation have been witnessed in the last 5 years. From only a few full-scale systems and pilot-scale demonstrations, there are currently at least 38 full-scale PRBs using zero-valent iron (ZVI) as a reactive material. Of those, 26 are continuous reactive walls, 9 are funnel-and- gate systems and 3 are in situ reactive vessels. Most of the PRB systems have used granular iron media and have been applied to address the control of contamination caused by chlorinated volatile organic compounds or heavy metals. Many regulatory agencies have expressed interest in PRB systems and are becoming more comfortable in issuing permits. The main advantage of PRB systems is that the installation costs are comparable with those of other ground-water remediation technologies, while the O and M costs are significantly lower and are mostly due to monitoring requirements, which are required for all remediation approaches. In addition, the land use can resume after the installation of the PRB systems, since there are few visible signs of the installation above grounds except for the monitoring wells. It is difficult to make any definite conclusions about the long-term performance of PRB systems because there is no more than 5 years of the record of performance that can be used for such analysis. The two main challenges still facing this technology are: (1) evaluating the longevity (geochemistry) of a PRB; and (2) ensuring/verifying hydraulic performance. A number of public/private partnerships have been established in recent years that are working together to resolve some of these problems. This organized approach by combining the efforts of several government agencies and private companies will likely result in better understanding and, hopefully, better acceptance of this technology in the future. (author)

  10. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  11. Limited applicability of cost-effectiveness and cost-benefit analyses for the optimization of radon remedial measures

    International Nuclear Information System (INIS)

    Jiránek, Martin; Rovenská, Kateřina

    2010-01-01

    Ways of using different decision-aiding techniques for optimizing and evaluating radon remedial measures have been studied on a large set of data obtained from the remediation of 32 houses that had an original indoor radon concentration level above 1,000 Bq/m 3 (around 0.2 % of all dwellings in the Czech Republic have a radon concentration higher than 1,000 Bq/ m 3 ). Detailed information about radon concentrations before and after remediation, type and extent of remedial measures and installation and operation costs were used as the input parameters for a comparison of costs and for determining the efficiencies, for a cost-benefit analysis and a cost-effectiveness analysis, in order to find out whether these criteria and techniques provide sufficient and relevant information for the improvement and optimization of remediation. The study has delivered quite new results. It is confirmed that the installation costs of remedial measures do not depend on the original level of indoor radon concentration, but on the technical state of the building. In addition, the study reveals that the efficiency of remediation does not depend on the installation costs. Each of the studied remedial measures will on an average save 0.3 lives and gain 4.3 years of life. On one hand, the general decision-aiding techniques - cost-benefit analysis and cost-effectiveness analysis - lead to the conclusion that the remedial measures reducing the indoor radon concentration from values above 1,000 Bq/m 3 to values below the action level of 400 Bq/m 3 are always acceptable and reasonable. On the other hand, these analytical techniques can neither help the designer to choose the proper remedial measure nor provide information resulting in improved remediation. (author)

  12. Isar-2 nuclear power station twenty-five years

    International Nuclear Information System (INIS)

    Fischer, Erwin; Luginger, Markus

    2013-01-01

    The Isar-2 nuclear power station (KKI 2) began commercial power operation on April 9, 1988. In these past 25 years the plant generated a total of approx. 285 billion kWh of electricity. The annual electricity production of KKI 2 of approx. 12 billion kWh corresponds to a share of approx. 15 % in the cumulated Bavarian electricity production. This amount of electricity, theoretically, could supply some 3 million three person households, or meet two thirds of the electricity requirement of the Bavarian industry, for one year. In its 25 years of power operation the Isar-2 nuclear power plant has recorded the highest annual gross electricity production of all nuclear power plants in the world nine times so far. A plant performance as impressive as this necessitates a plant availability far above the average. This, in turn, is based on short revision times and faultfree plant operation. However, high plant safety and availability must not be taken for granted, but are the result of responsible, safety-minded plant operation combined with continuous plant optimization and permanent execution of comprehensive checks, inspections, and maintenance measures. Besides plant technology also organization and administration were permanently advanced and adapted to changing requirements so as to safeguard reliable, safe, and non-polluting plant operation.

  13. Linking deposit morphology and clogging in subsurface remediation: Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Mays, David C. [University of Colorado Denver

    2013-12-11

    Groundwater is a crucial resource for water supply, especially in arid and semiarid areas of the United States west of the 100th meridian. Accordingly, remediation of contaminated groundwater is an important application of science and technology, particularly for the U.S. Department of Energy (DOE), which oversees a number of groundwater remediation sites from Cold War era mining. Groundwater remediation is complex, because it depends on identifying, locating, and treating contaminants in the subsurface, where remediation reactions depend on interacting geological, hydrological, geochemical, and microbiological factors. Within this context, permeability is a fundamental concept, because it controls the rates and pathways of groundwater flow. Colloid science is intimately related to permeability, because when colloids are present (particles with equivalent diameters between 1 nanometer and 10 micrometers), changes in hydrological or geochemical conditions can trigger a detrimental reduction in permeability called clogging. Accordingly, clogging is a major concern in groundwater remediation. Several lines of evidence suggest that clogging by colloids depends on (1) colloid deposition, and (2) deposit morphology, that is, the structure of colloid deposits, which can be quantified as a fractal dimension. This report describes research, performed under a 2-year, exploratory grant from the DOE’s Subsurface Biogeochemical Research (SBR) program. This research employed a novel laboratory technique to simultaneously measure flow, colloid deposition, deposit morphology, and permeability in a flow cell, and also collected field samples from wells at the DOE’s Old Rifle remediation site. Field results indicate that suspended solids at the Old Rifle site have fractal structures. Laboratory results indicate that clogging is associated with colloid deposits with smaller fractal dimensions, in accordance with previous studies on initially clean granular media. Preliminary

  14. Monitoring water quality in Sydney Harbour using blue mussels during remediation of the Sydney Tar Ponds, Nova Scotia, Canada.

    Science.gov (United States)

    Walker, Tony R; MacAskill, Devin

    2014-03-01

    Using mussels as monitoring tools we measured water quality in Sydney Harbour during a large scale, multi-year remediation project of the Sydney Tar Ponds (STPs); one of Canada's most contaminated sites. Chemical contaminants were measured in blue mussels (Mytilus edulis) in Sydney Harbour, which were used as monitoring tools to assess the spatio-temporal distribution of polycyclic aromatic hydrocarbons (PAHs); polychlorinated biphenyls (PCBs); metals (As, Cd, Cu, Hg, Pb, Zn) and lipid content during baseline and 3 years of remediation. The overall spatio-temporal distribution of chemicals in mussels was also compared to contaminants in other marine indicators (e.g., sediment, water and crab tissue). Measured metal concentrations in mussels showed some minor temporal variability (4 years), but these did not appear to be directly related to remediation activities, with the highest concentrations of As, Hg and Zn measured at reference stations. Most measured contaminants showed stable or potentially decreasing concentrations during the study, except Pb and Zn. Individual PAH compounds were mostly undetected during baseline and remediation, except for fluoranthene and pyrene. Concentrations of fluoranthene in mussels and deep water samples were moderately related. Generally, PCBs were undetected (remediation at some near-field stations. Contaminants measured during this study were at much lower concentrations than previously reported in other studies of mussels in Sydney Harbour and eastern Canada. This is likely due to the ongoing natural recovery of Sydney Harbour and to a lesser extent because of the environmental mitigation protection measures implemented during remediation activities at the STPs. The lack of detection of most individual PAHs and PCBs, plus relatively low bio-accumulation of metals observed during baseline and remediation attest to the effectiveness of using mussels as monitoring tools for environmental quality.

  15. Lead immobilization in thermally remediated soils and igneous rocks

    International Nuclear Information System (INIS)

    Hickmott, D.D.; Carey, J.W.; Stimac, J.; Larocque, A.; Abell, R.; Gauerke, E.; Eppler, A.

    1997-01-01

    This is the final report for a three-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The principal goal of this project was to investigate the speciation of lead in the environment at LANL and to determine the feasibility of using thermal remediation methods to immobilize lead in the environment. Lead occurs as pyromorphite [Pb(PO 4 ) 3 (Cl, OH)], cerussite (PbCO 3 ) and galena (PbS) in vapor-phase-altered Bandelier Tuff samples. LANL soils primarily contain cerussite and PbO. Thermal remediation experiments at high temperatures (up to 400 C) suggest that thermal immobilization of highly-reactive Pb compounds in the environment may be feasible, but that this technique is not optimal for more refractory lead phases such as cerussite and PbO

  16. Validity aspects in Chernobyl at twenty years of the accident

    International Nuclear Information System (INIS)

    Arredondo, C.

    2006-01-01

    inventory of rare gases of the core. The consequences of the accident have been studied during the twenty lapsed years since it happened. In this work the more recent discoveries on the effects in the health, the environment and economic that have been reported, as well as the current advances regarding the solution of the problems with the sarcophagus are commented. Other aspects little mentioned that consequences of the accident can be considered are discussed also, like they are the increment in the nuclear safety in the reactors in operation in the entire world and the termination of the cold war with the consequent dismantlement of a great one numbers of nuclear weapons. Finally it is remembered that the lessons learned in Chernobyl should never be forgotten. (Author)

  17. The Aftermath of Remedial Math: Investigating the Low Rate of Certificate Completion among Remedial Math Students

    Science.gov (United States)

    Bahr, Peter Riley

    2013-01-01

    Nationally, a majority of community college students require remedial assistance with mathematics, but comparatively few students who begin the remedial math sequence ultimately complete it and achieve college-level math competency. The academic outcomes of students who begin the sequence but do not complete it are disproportionately unfavorable:…

  18. Waste minimization applications at a remediation site

    International Nuclear Information System (INIS)

    Allmon, L.A.

    1995-01-01

    The Fernald Environmental Management Project (FEMP) owned by the Department of Energy was used for the processing of uranium. In 1989 Fernald suspended production of uranium metals and was placed on the National Priorities List (NPL). The site's mission has changed from one of production to environmental restoration. Many groups necessary for producing a product were deemed irrelevant for remediation work, including Waste Minimization. Waste Minimization does not readily appear to be applicable to remediation work. Environmental remediation is designed to correct adverse impacts to the environment from past operations and generates significant amounts of waste requiring management. The premise of pollution prevention is to avoid waste generation, thus remediation is in direct conflict with this premise. Although greater amounts of waste will be generated during environmental remediation, treatment capacities are not always available and disposal is becoming more difficult and costly. This creates the need for pollution prevention and waste minimization. Applying waste minimization principles at a remediation site is an enormous challenge. If the remediation site is also radiologically contaminated it is even a bigger challenge. Innovative techniques and ideas must be utilized to achieve reductions in the amount of waste that must be managed or dispositioned. At Fernald the waste minimization paradigm was shifted from focusing efforts on source reduction to focusing efforts on recycle/reuse by inverting the EPA waste management hierarchy. A fundamental difference at remediation sites is that source reduction has limited applicability to legacy wastes but can be applied successfully on secondary waste generation. The bulk of measurable waste reduction will be achieved by the recycle/reuse of primary wastes and by segregation and decontamination of secondary wastestreams. Each effort must be measured in terms of being economically and ecologically beneficial

  19. Passive remediation strategies for petroleum contaminated sites

    International Nuclear Information System (INIS)

    Everett, L.G.; Cullen, S.J.; Eccles, L.A.

    1991-01-01

    The US EPA is becoming increasingly aware of costs and the limited success of existing remediation strategies. Research teams within the US EPA believe that if passive remediation can be successfully demonstrated, it is a candidate for best available technology. Passive remediation, however, must be demonstrated through the use of monitoring techniques, which demonstrate: contaminants are not moving in the dissolved, adsorbed or free product phase; and contamination is biodegrading in-place. This paper presents a concise monitoring and analysis strategy for passive remediation. Specifically, the paper presents the accuracy, precision and operating range of neutron moderation techniques as a low cost, real-time screening tool to measure the migration of the dissolved phase in soil moisture, the stabilized adsorbed phase and free product movement. In addition, the paper identifies the capillary pressure range through which the dissolved phase will move and identifies techniques for satisfying the risk analysis that movement is not taking place. The rationale for passive remediation taking place is confirmed through a discussion of gas ratios associated with bacterial assimilation of hydrocarbons. Gas ratios which are relatively constant above ground are highly inverted in the subsurface at contamination sites. The use of frequent screening of a vertical geologic profile using least cost techniques and the infrequent analysis of soil gas ratios provides the required data upon which the public will accept passive remediation as best available technology at a particular site. The paper points out that neutron moderation is a high candidate vadose zone monitoring device and identifies alternative techniques using resistivity and dielectric constants, which are in the developmental stage. The economic implications for passive remediation are enormous relative to the excavation and remediation strategies which are currently in use

  20. The programme for remediation of contaminated mine sites: Its regulation and follow-up in Portugal

    International Nuclear Information System (INIS)

    Santiago Baptista, A.

    2005-01-01

    The policy of the Portuguese Government of assuming responsibility for remediating contaminated abandoned mine sites originated in an initiative taken between 1995 and 2001 by the General Directorate for the Environment and the Geological and Mining Institute. It has the aim of assessing and solving the prevailing environmental problems in some of the most contaminated abandoned mine sites in Portugal. On 6 July 2001, through Decree Law No. 198-A/2001, the Government defined the institutional and financial provisions to be adopted for implementing the environmental remediation programme. EXMIN-Industry and Mining Environmental Services S.A., a state owned company, was awarded an exclusive renewable contract on September 5 of the same year for a period of 10 years to implement this programme. Financing of the contract was guaranteed through EU funds under the FEDER programme, up to a maximum of Euro 52 million, to be spent before the end of the year 2006. In the beginning of 2002 a steering committee was nominated and took up its responsibilities, having been delegated a wide range of powers. At the same time the Ministers for Economic and Environmental Affairs delegated wide ranging powers to a technical evaluation subcommittee. The strategic definition of the targets of the old mine site remediation programme, which remains under the direct responsibility of the relevant ministers, highlights the importance of public health and safety and the social and economic development of the regions concerned. The information already gathered indicates that in total around 170 old mine sites require remediation. The time limit of 2006 for the availability of EU funds needs to be taken into consideration for the development of the remediation strategy. The specific situation of the old radioactive ore mines is described, as well as the status of the programme. (author)

  1. Status and outlook for the WISMUT Remediation Project in the States of Thuringia and Saxony, Germany

    International Nuclear Information System (INIS)

    Hagen, M.; Gatzweiler, R.; Jakubick, A.T.

    2002-01-01

    The ongoing WISMUT Remediation Program deals with the legacy of more than 40 years of largescale uranium mining and processing in the densely populated areas of Eastern Thuringia and Saxony (Germany). The mining and processing operations (total uranium production more than 220,000 tonnes) comprise an area of approx. 37 km 2 . WISMUT started with a complex site investigation program to determine the degree of contamination of affected areas and an extended environmental monitoring system of the pathways was established. The overall approach follows the general rule of guiding, planning and implementation of the site specific rehabilitation projects to ensure an optimal balance between rehabilitation costs and environmental benefits while complying with the applicable laws and requirements of the permitting agencies. The WISMUT approach to remediation can be viewed as an adaptable process tailored to specific circumstances and site specific situations taking public interests into account. Remediation solutions will be demonstrated by various site specific examples. The WISMUT decommissioning and rehabilitation project is now in its eleventh year and by middle of the year 2000 approximately half of the cleanup has been finished. A well thought out approach to water treatment and timely adjustment to changing conditions will help save water treatment costs. Consideration of the post rehabilitation use and surveillance requirements are an integral part of the optimisation of the remedial measures. (author)

  2. Developing a disposal and remediation plan

    International Nuclear Information System (INIS)

    Messier, T.S.

    1999-01-01

    The environmental release of wastes generated by the upstream oil and gas industry in Alberta can result in polluted soil and groundwater at several facilities across the province. Responsibility for decommissioning upstream oil and gas facilities falls under the jurisdiction of the Alberta Energy and Utilities Board (EUB) and Alberta Environmental Protection (AEP). This paper outlines a protocol that can serve as a framework for the development of a plan to dispose of oilfield waste and to remediate related contaminated soils. The components involved in developing a disposal and remediation plan for oilfield wastes are: (1) identifying the potential source of pollution and oilfield waste generation, (2) characterizing oilfield wastes, (3) determining the nature and extent of soil and groundwater pollution, (4) preparing a remedial action plan, (5) assessing the viability of various remediation options, and (6) preparing health and safety plan. 12 refs., 2 tabs., 2 figs

  3. REAL TIME DATA FOR REMEDIATION ACTIVITIES (11505)

    International Nuclear Information System (INIS)

    Brock, C.T.

    2011-01-01

    Health physicists from the CH2M HILL Plateau Remediation Company collaborated with Berkeley Nucleonics Corporation to modify the SAM 940 isotope identifier instrument to be used for nuclear waste remediation. These modifications coupled with existing capabilities of the SAM 940 have proven to be invaluable during remediation activities, reducing disposal costs by allowing swift remediation of targeted areas that have been identified as having isotopes of concern (IOC), and eliminating multiple visits to sites by declaring an excavation site clear of IOCs before demobilizing from the site. These advantages are enabled by accumulating spectral data for specific isotopes that is nearly 100 percent free of false positives, which are filtered out in 'real time.'

  4. Early detection of factual knowledge deficiency and remediation in otolaryngology residency education.

    Science.gov (United States)

    Platt, Michael P; Davis, Elizabeth M; Grundfast, Kenneth; Grillone, Gregory

    2014-08-01

    Within otolaryngology residency training, the annual Otolaryngology Training Examination (OTE) is the primary method used to assess, quantify, and compare the factual knowledge acquired by each resident. The objective of this study was to develop a more frequent method for tracking of factual knowledge to prevent educational delay. Retrospective analysis of educational scores. For each didactic lecture within a single otolaryngology residency training program, multiple choice questions were provided before and after each lecture. Questions were based on lecture objectives that were derived from the American Board of Otolaryngology curriculum. Scores were tracked over the course of 1 academic year and compared to the scores of residents on the OTE administered in that year to determine correlation with a validated measure of factual knowledge. The effect of remedial measures on improvement in OTE scores was determined. Over the course of 1 academic year, there were 328 questions presented to 12 residents before and after 32 lectures in the didactic program. Ten residents completed an average of 244 questions. Overall OTE scores demonstrated a significant and very strong correlation to lecture question scores (Pearson r = 0.86, P = .002). Remedial measures for residents during the previous 5 years who had inadequate OTE scores were successful in improving scores (P = .002). A structured didactic program that uses review questions to assess knowledge can be used to track acquisition of factual knowledge. Early identification of residents with deficiencies facilitates the development of individualized learning plans that result in successful remediation. © 2014 The American Laryngological, Rhinological and Otological Society, Inc.

  5. Foreword Special Issue on Electrokinetic remediation

    NARCIS (Netherlands)

    Loch, J.P.G.; Lima, A.T.

    2012-01-01

    Since the first symposium on Electro-remediation (EREM) in 1997 at the École des Mines d’Albi, in Albi, France, much international attention, interest and progress have been generated in the science and technology of electro-remediation of contaminated soils, sediments and construction

  6. Remediation of the Maxey Flats Site

    International Nuclear Information System (INIS)

    1990-01-01

    This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets

  7. Cost-efficient remediation of an upstream oilfield battery site

    Energy Technology Data Exchange (ETDEWEB)

    Siebert, L.D. [Imperial Oil Resources Canada, Calgary, AB (Canada); Bedard, G.; Pouliot, M.; Soucy, F.; Faucher, C.; Corbin, R. [Biogenie Inc., Quebec City, PQ (Canada)

    2003-07-01

    The soil at an oilfield battery site, located 18 kilometres (km) northwest of Devon, Alberta has been contaminated with crude oil and salt, following years of operation. Surrounding the site is flat farmland intended for future agricultural production. A remedial program aimed at complying with Tier I criteria of the Alberta Soil and Water Quality Guidelines for Hydrocarbons at Upstream Oil and Gas Facilities (ASWQG) of Alberta Environment, was developed and implemented. Characterization of the site was carried out in 1997 to delineate a salt plume, followed by a second sampling campaign in 1999, which all together revealed three impacted areas. A supplementary characterization was performed in 2001 by Biogenie in an effort to better determine the nature and level of petroleum contamination and more accurately evaluate the volume of contaminated soil. A three-dimensional Visualization software integrating a Kriging geostatistical model was used for this purpose. The results indicated that an estimated 8,800 cubic metres of contaminated soil would need to be excavated and treated. The next phase involved an evaluation of the various remedial options, which was accomplished using a biotreatability study. The remediation program selected involved the excavation of the contaminated soil and segregation of source material, the ex-situ Biopile treatment of the source material to meet Class II landfill criteria, and the ex-situ Biopile treatment of the contaminated soil followed by its use as backfill on site. The biotreatability study proved to be a strategic tool in the remediation effort. 1 tab., 2 figs.

  8. Methods for the analysis and remediation of contaminated sites

    International Nuclear Information System (INIS)

    Mariani, M.; Bemporad, E.; Berardi, S.; Marino, A.; Paglietti, F.

    2008-01-01

    In Italy, in recent years, the number of contaminated sites has multiplied disproportionately. In essence, contamination is caused by accidental spills or intentional discharge of pollutants into the soils or waters from industrial activities, or non-controlled deposits of urban and/or industrial waste, mostly part toxic and harmful. Contaminated sites clearly pose risks to human health and the environment; hence the need to remediate these sites. The remediation of soil and water and the restoration of degraded areas are complex operations requiring specific technical and scientific know-how, including knowledge of the methodologies and tools required to tackle problems arising during the different phases of the remediation process. These include, in particular: - health and environmental risk assessment procedures for the quantification of risks to human health (general population and workers) and the environment from a contaminated site; - remote sensing and the Geographical Information Systems (GIS), which are a fundamentally important IT support for each phase of planning and management of remediation interventions; - criteria for the management of sites contaminated by asbestos, a highly carcinogenic and therefore hazardous substance that was widely used in the past due to its particular mechanical and thermal characteristics; - analysis of the issues relating to waste management in contaminated sites; - relationship between safety procedures for workers and the general population. Identification of the best available techniques for an efficient, integrated management of contaminated sites, which will also take into account the health protection of workers and of the general population living near such sites

  9. Remediation of a Former Uranium Mining and Milling Area and Its Knowledge Management: An Overview

    International Nuclear Information System (INIS)

    Kreyßig, E.; Hiller, A.; Schmidt, P.

    2016-01-01

    Full text: For 25 years now, the federally-owned Wismut GmbH has been remediating the legacies left behind by former uranium ore mining and processing operations in Eastern Germany. In that area, the former Soviet-German stock company SDAG WISMUT had produced a total of 216’000 tonnes of uranium during a period of more than forty years. It had evolved into the world’s fourth largest uranium producer at that time. The large number of sites (7) and individual objects (> 400) and the long period, needed for the following complex remediation process, forced the establishment of a comprehensive data, information and knowledge management system. The present paper describes the WISMUT KM system and its implementation in current activities. A technical data base named AL.VIS/W serves as platform for the storage, search and exchange of data and information. It also provides information required to fulfil post-remedial long-term tasks including institutional control. Case studies are given to illustrate the efficiency of the tools developed by Wismut GmbH and its partners. In detail, the environmental data base and its operational features are described. Further, the experience in developing and implementing the object-related remediation documentations is presented. (author

  10. Twenty Practices of an Entrepreneurial University

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs; Wilderom, Celeste P.M.; Cameron, Shona P.B.

    2006-01-01

    studies twenty organisational practices against which a University's entrepreneurship can be measured. These twenty practices or factors in effect formed the basis for an entrepreneurship audit. During a series of interviews, the extent to which the universities are seen as entrepreneurial...

  11. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown

  12. Remediating MGP brownfields

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1997-01-01

    Before natural gas pipelines became widespread in this country, gas fuel was produced locally in more than 5,000 manufactured gas plants (MGPs). The toxic wastes from these processes often were disposed onsite and have since seeped into the surrounding soil and groundwater. Although the MGPs--commonly called gas plants, gas-works or town gas plants--have closed and most have been demolished, they have left a legacy of environmental contamination. At many MGP sites, underground storage tanks were constructed of wood or brick, with process piping and equipment which frequently leaked. Waste materials often were disposed onsite. Releases of coal tars, oils and condensates produced within the plants contributed to a wide range of contamination from polycyclic aromatic hydrocarbons, phenols, benzene and cyanide. Remediation of selected MGP sites has been sporadic. Unless the site has been identified as a Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) Superfund site, the regulatory initiative to remediate often remains with the state in which the MGP is located. A number of factors are working to change that picture and to create a renewed interest in MGP site remediation. The recent Brownfield Initiative by the US Environmental Protection Agency (EPA) is such an example

  13. The proceduralisation of data protection remedies under EU data protection law : Towards a more effective and data subject-oriented remedial system?

    NARCIS (Netherlands)

    Galetta, Antonella; de Hert, Paul

    2015-01-01

    The proceduralisation of data protection remedies under EU data protection law: towards a more effective and data subject-oriented remedial system?
The right to remedy breaches of data protection is laid down in both Directive 95/46/EC (Art. 22) and the Council of Europe Data Protection Convention

  14. Development of a waste minimization plan for a Department of Energy remedial action program: Ideas for minimizing waste in remediation scenarios

    International Nuclear Information System (INIS)

    Hubbard, Linda M.; Galen, Glen R.

    1992-01-01

    Waste minimization has become an important consideration in the management of hazardous waste because of regulatory as well as cost considerations. Waste minimization techniques are often process specific or industry specific and generally are not applicable to site remediation activities. This paper will examine ways in which waste can be minimized in a remediation setting such as the U.S. Department of Energy's Formerly Utilized Sites Remedial Action Program, where the bulk of the waste produced results from remediating existing contamination, not from generating new waste. (author)

  15. Some Observations on Cultural Opposites in Contemporary China: Kunming and Beijing Twenty Years Later

    Directory of Open Access Journals (Sweden)

    Vesna Vučinić-Nešković

    2016-02-01

    Full Text Available This paper considers the cultural opposites observed in various segments of Chinese culture during the author's three stays in China over a period of twenty years. The first and second stay, in 1986 and 1989 respectively, coincided with the initial period of the implementation of modernization reforms in China, when their results were just beginning to be felt. The third stay was in 2009, towards the end of the third decade of reform implementation, at the time of an already developed marketoriented communism. The paper's main thesis is that most of the phenomena observed in present-day urban China can be assigned to opposite categories, namely Chinese-Western and traditional- contemporary. Cultural opposites have been observed in the sphere of tourism and the behavior of both Chinese and foreign visitors, in the use of Chinese and English in notices and signs in public places, and in the promotion of traditional and modern architecture. In addition, they have been noted in the presentation of arts and crafts and industrial products, in the manner of consumption of hot drinks, and in the combining of Chinese and foreign cuisine. They are also evident in a Beijing Opera performance adapted both to the modern Chinese and to foreigners, and in the traditional Chinese exercises and western dances performed in public parks. In conclusion, the paper suggests that the process of establishing connections between China and the West is being carried on in a moderate and controlled way. In the globalization process cultural opposites coexist and merge, imparting new features to Chinese culture.

  16. Risk evaluation of remedial alternatives for the Hanford Site

    International Nuclear Information System (INIS)

    Clark, S.W.; Lane, N.K.; Swenson, L.

    1994-01-01

    Risk assessment is one of the many tools used to evaluate and select remedial alternatives and evaluate the risk associated with selected remedial alternatives during and after implementation. The risk evaluation of remedial alternatives (RERA) is performed to ensure selected alternatives are protective of human health and the environment. Final remedy selection is promulgated in a record of decision (ROD) and risks of the selected alternatives are documented. Included in the ROD documentation are the risk-related analyses for long-term effectiveness, short-term effectiveness, and overall protection of human health and the environment including how a remedy will eliminate, reduce or control risks and whether exposure will be reduced to acceptable levels. A major goal of RERA in the process leading to a ROD is to provide decision-makers with specific risk information that may be needed to choose among alternatives. For the Hanford Site, there are many considerations that must be addressed from a risk perspective. These include the large size of the Hanford Site, the presence of both chemical and radionuclide contamination, one likelihood of many analogues sites, public and worker health and safety, and stakeholder concern with ecological impacts from site contamination and remedial actions. A RERA methodology has been promulgated to (1) identify the points in the process leading to a ROD where risk assessment input is either required or desirable and (2) provide guidance on how to evaluate risks associated with remedial alternatives under consideration. The methodology and evaluations parallel EPA guidance requiring consideration of short-term impacts and the overall protectiveness of remedial actions for evaluating potential human health and ecological risks during selection of remedial alternatives, implementation of remedial measures, and following completion of remedial action

  17. Papers of the remediation technologies symposium 2005. CD-ROM ed.

    International Nuclear Information System (INIS)

    2005-01-01

    This conference was attended by over 500 delegates and provided an opportunity for industry, practitioners, researchers and regulators to discuss technical issues in environmental remediation research and recent innovations in soil and groundwater remediation. Sessions included presentations on in-situ, groundwater and surface water remediation. Issues concerning phytoremediation, natural attenuation, extraction and commercial redevelopment were examined. The aim of the conference was also to provide a forum for innovators in remediation to present new work. Topics included hydrocarbon and salt contamination; engineered soil cover for management of salt impacted sites; remediation and revegetation of tar sands composite tailings containing naphthenic acids; sorption of oil sands naphthenic acid mixtures; denitrification as a natural attenuation mechanism; sampling methodologies; variability assessments; stabilization treatment technologies; remediation of coal wastes; bioreactor landfills; well blowouts in Alberta; soil remediation in coarse gravelly soils; diesel-contaminated aquifers; gasoline spill remediation; soil vapour extraction systems; technological solutions for erosion control and water clarification; and cost-effective in-situ remediation strategies. Fifty-two technical presentations were given, of which 27 have been catalogued separately for inclusion in this database

  18. Papers of the remediation technologies symposium 2005. CD-ROM ed.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This conference was attended by over 500 delegates and provided an opportunity for industry, practitioners, researchers and regulators to discuss technical issues in environmental remediation research and recent innovations in soil and groundwater remediation. Sessions included presentations on in-situ, groundwater and surface water remediation. Issues concerning phytoremediation, natural attenuation, extraction and commercial redevelopment were examined. The aim of the conference was also to provide a forum for innovators in remediation to present new work. Topics included hydrocarbon and salt contamination; engineered soil cover for management of salt impacted sites; remediation and revegetation of tar sands composite tailings containing naphthenic acids; sorption of oil sands naphthenic acid mixtures; denitrification as a natural attenuation mechanism; sampling methodologies; variability assessments; stabilization treatment technologies; remediation of coal wastes; bioreactor landfills; well blowouts in Alberta; soil remediation in coarse gravelly soils; diesel-contaminated aquifers; gasoline spill remediation; soil vapour extraction systems; technological solutions for erosion control and water clarification; and cost-effective in-situ remediation strategies. Fifty-two technical presentations were given, of which 27 have been catalogued separately for inclusion in this database. tabs., figs.

  19. Source zone remediation by zero valent iron technologies

    DEFF Research Database (Denmark)

    Fjordbøge, Annika Sidelmann

    at a fifth of these contaminated sites. These source zones pose a serious threat to soil and groundwater quality. Remediation of the heterogeneous source zones is challenging due to irregular downwards migration patterns in the subsurface, low aqueous solubility and matrix diffusion. To protect the soil...... and groundwater resources from long-term deterioration, the development of in situ technologies suitable for remediation of DNAPL is warranted. Currently, an array of aggressive in situ remediation technologies remediation exists. These technologies may be suitable under various site specific conditions; however......, most of them are limited by subsurface heterogeneities and/or the risk of inadvertent DNAPL displacement during field application. This thesis presents the results of an investigation of the potential for remediation of chlorinated solvent source zones by emerging zero valent iron (ZVI) based...

  20. Waste management and environmental compliance aspects of a major remedial action program

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.

    1991-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) is one of four major programs undertaken by the US Department of Energy (DOE) to remediate various sites where radiological contamination remained from programs conducted during the nation's early years of research and development in atomic energy. The remedial actions at the 33 sites that are currently in FUSRAP could generate an estimated total volume of about 1.6 million cubic meters of radioactive waste. Waste disposal is currently estimated to represent about one-third of the total estimated $2.1 billion cost for the entire program over its total duration. Waste management aspects within the program are diverse. The sites range in size from small areas used only for storage operations to large-scale decommissioned industrial facilities where uranium processing and other operations were carried out in the past. Currently, four sites are on the National Priorities List for remediation. Remedial actions at FUSRAP sites have to satisfy the requirements of both the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation and Liability Act, as amended. In addition, a number of federal, state, and local laws as well as Executive Orders and DOE Orders may be applicable or relevant to each site. Several key issues currently face the program, including the mixed waste issue, both from the environmental compliance (with Resource Conservation and Recovery Act) and the disposal technology perspectives. 7 refs., 1 tab

  1. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR

  2. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

  3. The impact of the healthcare system in Barbados (provision of health insurance and the benefit service scheme) on the use of herbal remedies by Christian churchgoers.

    Science.gov (United States)

    Cohall, D H; Scantlebury-Manning, T; Cadogan-McLean, C; Lallement, A; Willis-O'Connor, S

    2012-06-01

    To determine the impact of health insurance and the government's Benefit Service Scheme, a system that provides free drugs to treat mostly chronic illnesses to persons aged 16 to 65 years, on the use of herbal remedies by Christian churchgoers in Barbados. The eleven parishes of Barbados were sampled over a six-week period using a survey instrument developed and tested over a four-week period prior to administration. Persons were asked to participate and after written informed consent, they were interviewed by the research team. The data were analysed by the use of IBM SPSS version 19. The data were all nominal, so descriptive statistics including counts, the frequencies, odds ratios and percentages were calculated. More than half of the participants (59.2%) were female, a little less than a third (29.9%) were male, and one tenth of the participants (10.9%) did not indicate their gender The majority of the participants were between the ages of 41 and 70 years, with the age range of 51-60 years comprising 26.1% of the sample interviewed. Almost all of the participants were born in Barbados (92.5%). Approximately 33% of the respondents indicated that they used herbal remedies to treat various ailments including chronic conditions. The odds ratio of persons using herbal remedies and having health insurance to persons not using herbal remedies and having health insurance is 1.01 (95% CI 0.621, 1.632). There was an increase in the numbers of respondents using herbal remedies as age increased. This trend continued until the age group 71-80 years which showed a reduction in the use of herbal remedies, 32.6% of respondents compared with 38.3% of respondents in the 61-70-year category. The data demonstrated that only a third of the study population is using herbal remedies for ailments. Health insurance was not an indicator neither did it influence the use of herbal remedies by respondents. The use of herbal remedies may not be associated with affluence. The reduction in

  4. Lead contamination of paint remediation workers' vehicles.

    Science.gov (United States)

    Boraiko, Carol; Wright, Eva M; Ralston, Faye

    2013-03-01

    Exposure to lead has been shown to be harmful to adults; it is a teratogen, it can damage the peripheral nervous system, and it adversely affects the reproductive system. Professional lead-based paint remediation workers are at risk of exposure to lead dust. The authors' study was conducted to determine if these remediation workers transfer lead from their work site to their vehicles and then potentially expose their families. It was hypothesized that remediation workers transported the lead from the remediation work site to the floorboards of their vehicles due to not following required protective equipment use. The laboratory's level of quantitation for lead on the wipe samples, 10 microg/ft2, was used to indicate lead contamination. This level was exceeded in 50% of the floorboards sampled. These results confirm that many vehicle floorboards used by remediation workers are contaminated with lead dust, potentially resulting in transfer of lead dust. The ultimate detrimental outcome could be the transfer of lead particles to other family members, causing the poisoning of a child or other at-risk person.

  5. Assessment of a biological in situ remediation

    International Nuclear Information System (INIS)

    Wuerdemann, H.; Lund, N.C.; Gudehus, G.

    1995-01-01

    A field experiment using a bioventing technique has been conducted at the center of contamination at a former gasworks site for 3 years. The emphasis of this investigation is to determine the efficiency of in situ remediation. Due to an extremely heterogeneous distribution of contamination it was impossible to satisfactorily quantify the reduction of hydrocarbons. However, a comparison of highly contaminated soil samples shows a qualitative alteration. The analyses of pollutant composition reveal a significant decrease of low condensed PAHs up to anthracene. The relative increase of high condensed PAHs in the contaminant composition indicates a PAH degradation of 54%. Soil respiration is used to assess the course of remediation. Continuous monitoring of O 2 and CO 2 in the used air leads to an amount of about 2,400 kg of decomposed organics. Large-scale elution tests show a reduction of the sum parameters for the organic pollution of the flushing water of 80%. The PAHs have dropped about 97%. The Microtox test indicates a detoxification of 98%

  6. At-risk high school seniors: Science remediation for Georgia's High School Graduation Test

    Science.gov (United States)

    Carroll, Carolyn M.

    State departments of education have created a system of accountability for the academic achievement of students under the mandate of the No Child Left Behind Act of 2001. The Georgia Department of Education established the Georgia High School Graduation Test (GHSGT) as their method of evaluating the academic achievement of high school students. The GHSGT consist of five sections and students must pass all five sections before students they are eligible to receive a diploma. The purpose of the study was to examine the effects of teacher-lead and computer based remediation for a group of high school seniors who have been unsuccessful in passing the science portion of the GHSGT. The objectives of this study include (a) Identify the most effective method of remediation for at-risk students on the science section of the GHSGT, and (b) evaluate the methods of remediation for at-risk students on the science section of GHSGT available to high school students. The participants of this study were at-risk seniors enrolled in one high school during the 2007-2008 school year. The findings of this research study indicated that at-risk students who participated in both types of remediation, teacher-led and computer-based, scored significantly higher than the computer-based remediation group alone. There was no significant relationship between the test scores and the number of times the students were tested.

  7. Gunnar uranium mine environmental remediation - Northern Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    Muldoon, Joe; Yankovich, Tamara; Schramm, Laurier L. [Saskatchewan Research Council, Saskatoon, SK (Canada)

    2013-07-01

    The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22. largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which

  8. Technologies to remediate hazardous waste sites

    International Nuclear Information System (INIS)

    Falco, J.W.

    1990-03-01

    Technologies to remediate hazardous wastes must be matched with the properties of the hazardous materials to be treated, the environment in which the wastes are imbedded, and the desired extent of remediation. Many promising technologies are being developed, including biological treatment, immobilization techniques, and in situ methods. Many of these new technologies are being applied to remediate sites. The management and disposal of hazardous wastes is changing because of federal and state legislation as well as public concern. Future waste management systems will emphasize the substitution of alternatives for the use of hazardous materials and process waste recycling. Onsite treatment will also become more frequently adopted. 5 refs., 7 figs

  9. Economics of biofiltration for remediation projects

    International Nuclear Information System (INIS)

    Yudelson, J.M.; Tinari, P.D.

    1995-01-01

    Biofilters with granular activated carbon (GAC) filter backup units offer substantial savings compared to conventional GAC filters and catalytic/thermal oxidation (Catox) units in controlling emissions of volatile organic compounds (VOCs) from petroleum remediation projects. Provided that the biofilter supplier is willing to satisfy the client's and consultant's risk-management concerns, biofilters offer anew method for reducing the cost of remediation projects, with savings of up to $10,000 (24%) per facility in 24-month projects and up to $16,000 (32%) per facility in 36-month projects for simple gas station remediation projects. Savings will be greater for longer projects and projects with higher average contaminant loadings

  10. Abstracts of Remediation Case Studies, Volume 9

    Science.gov (United States)

    This report, published by the Federal Remediation Technologies Roundtable (FRTR), is a collection of recently published abstracts summarizing 13 cost and performance case studies on the use of remediation technologies at contaminated sites.

  11. 10 CFR 1008.15 - Civil remedies.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Civil remedies. 1008.15 Section 1008.15 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) RECORDS MAINTAINED ON INDIVIDUALS (PRIVACY ACT) Requests for Access or Amendment § 1008.15 Civil remedies. Subsection (g) of the Act provides that an individual may bring suit...

  12. 200 Areas soil remediation strategy -- Environmental Restoration Program

    International Nuclear Information System (INIS)

    1996-09-01

    The remediation and waste management activities in the 200 Areas of the Hanford Site (located in Richland, Washington) currently range from remediating groundwater, remediating source units (contaminated soils), decontaminating and decommissioning of buildings and structures, maintaining facilities, managing transuranic, low-level and mixed waste, and operating tank farms that store high-level waste. This strategy focuses on the assessment and remediation of soil that resulted from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs, burial grounds) in the 200 Areas and addresses only those waste sites assigned to the Environmental Restoration Program

  13. Twenty-Year Survey of Scientific Literacy and Attitudes Toward Science: Students’ Acceptance of Astrology and Pseudoscience

    Science.gov (United States)

    Sugarman, Hannah R.; Impey, C.; Buxner, S.; Antonellis, J.

    2010-01-01

    Our survey used to collect data during a twenty-year long investigation into the science literacy of undergraduates (see Impey et al., this meeting), contains several questions addressing how students conceptualize astrology, and other pseudoscientific ideas. This poster presents findings from the quantitative analysis of some of these question responses from almost 10,000 undergraduate students enrolled in introductory astronomy courses from 1989 to 2009. The results from our data reveal that a large majority of students (78%) and half of science majors (52%) consider astrology either "very” or "sort of” scientific. Students performed comparatively better on all other pseudoscientific questions, demonstrating that belief in astrology is pervasive and deeply entrenched. We compare our results to those obtained by the NSF Science Indicators series, and suggest possible reasons for the high susceptibility to belief in astrology. These findings call into question whether our education system is adequately preparing students to be scientifically literate adults. You can help! Stop by our poster and fill out a new survey that will give us important parallel information to help us continue to analyze our valuable data set. We acknowledge the NSF for funding under Award No. 0715517, a CCLI Phase III Grant for the Collaboration of Astronomy Teaching Scholars (CATS) Program.

  14. An Expert support model for ex situ soil remediation

    NARCIS (Netherlands)

    Okx, J.P.; Frankhuizen, E.M.; Wit, de J.C.; Pijls, C.G.J.M.; Stein, A.

    2000-01-01

    This paper presents an expert support model recombining knowledge and experience obtained during ex situ soil remediation. To solve soil remediation problems, an inter-disciplinary approach is required. Responsibilities during the soil remediation process, however, are increasingly decentralised,

  15. Integration of biotechnology in remediation and pollution prevention activities

    International Nuclear Information System (INIS)

    Strong-Gunderson, J.M.

    1996-01-01

    The North American Free Trade Agreement/North American Agreement on Environmental Cooperation provides a mechanism for an international collaboration between the US, Canada, and Mexico to jointly develop, modify, or refine technologies that remediate or protect the environment. These countries have a vested interest in this type of collaboration because contaminants do not respect the boundaries of a manufacturing site, region, city, state, or country. The Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) consists of a diverse group of individuals who address a variety of environmental issues. ESD is involved in basic and applied research on the fate, transport, and remediation of contaminants; environmental assessment; environmental engineering; and demonstrations of advanced remediation technologies. The remediation and protection of the environment includes water, air, and soils for organic, inorganic, and radioactive contaminants. In addition to remediating contaminated sites, research also focuses on life-cycle analyses of industrial processes and the production of green technologies. The author focuses this discussion on subsurface remediation and pollution prevention; however, the research activities encompass water, soil and air and many of the technologies are applicable to all environments. The discussion focuses on the integration of biotechnology with remediation activities and subsequently linking these biological processes to other remediation technologies

  16. Role of biochar on composting of organic wastes and remediation of contaminated soils-a review.

    Science.gov (United States)

    Wu, Shaohua; He, Huijun; Inthapanya, Xayanto; Yang, Chunping; Lu, Li; Zeng, Guangming; Han, Zhenfeng

    2017-07-01

    Biochar is produced by pyrolysis of biomass residues under limited oxygen conditions. In recent years, biochar as an amendment has received increasing attention on composting and soil remediation, due to its unique properties such as chemical recalcitrance, high porosity and sorption capacity, and large surface area. This paper provides an overview on the impact of biochar on the chemical characteristics (greenhouse gas emissions, nitrogen loss, decomposition and humification of organic matter) and microbial community structure during composting of organic wastes. This review also discusses the use of biochar for remediation of soils contaminated with organic pollutants and heavy metals as well as related mechanisms. Besides its aging, the effects of biochar on the environment fate and efficacy of pesticides deserve special attention. Moreover, the combined application of biochar and compost affects synergistically on soil remediation and plant growth. Future research needs are identified to ensure a wide application of biochar in composting and soil remediation. Graphical abstract ᅟ.

  17. Life Cycle Sustainability Assessment of Sediment Remediation at the London Olympic Park

    Science.gov (United States)

    Hou, D.; Al-Tabbaa, A.

    2013-12-01

    In recent years, there is an emerging 'green and sustainable remediation' (GSR) movement. It is drawing increasing attention from both the government and the industry, because this GSR movement is promising in accelerating process in addressing the contaminated land issue, by overcoming regulatory barriers, encouraging technological innovation, and balancing life cycle environmental stewardship with economic vitality and social well-being. Life cycle assessment (LCA) has been increasingly used by both researchers and industrial practitioners in an initiative to make environmental remediation greener and more sustainable. Life cycle sustainability assessment (LCSA), aiming at expanding the traditional LCA model in both breadth and depth (e.g. to incorporate both environmental and social-economic sustainability), is an important research direction in the existing LCA research field. The present study intends to develop a LCSA method based on a hybrid LCA model and economic input-output (EIO) data. The LCSA method is applied to a contaminated sediment remediation project conducted at the London Olympic Park site.

  18. International cyclotron conferences: twenty-five years of progress

    International Nuclear Information System (INIS)

    Martin, J.A.

    1984-01-01

    This brief introduction reviews a few of the highlights of the nine previous meetings to perhaps convey an appreciation of the time-scale of the significant achievements of past years and to leave the thought that the future is as filled with promise as was the past

  19. 28 CFR 54.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-07-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Remedial and affirmative action and self... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  20. 22 CFR 229.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-04-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Remedial and affirmative action and self... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  1. 10 CFR 1042.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-01-01

    .... (c) Self-evaluation. Each recipient education institution shall, within one year of February 20, 2001... 10 Energy 4 2010-01-01 2010-01-01 false Remedial and affirmative action and self-evaluation. 1042... OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 1042...

  2. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    International Nuclear Information System (INIS)

    1993-01-01

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information

  3. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-12-31

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  4. 40 CFR 85.1803 - Remedial Plan.

    Science.gov (United States)

    2010-07-01

    ... POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1803 Remedial Plan. (a) When any manufacturer is... the total parts requirement of each person who is to perform the repair under the remedial plan to be...: (i) The recall campaign number; and (ii) A code designating the campaign facility at which the repair...

  5. Engineering and environmental remediation scenarios due to leakage from the Gulf War oil spill using 3-D numerical contaminant modellings

    Science.gov (United States)

    Yihdego, Yohannes; Al-Weshah, Radwan A.

    2017-11-01

    The transport groundwater modelling has been undertaken to assess potential remediation scenarios and provide an optimal remediation options for consideration. The purpose of the study was to allow 50 years of predictive remediation simulation time. The results depict the likely total petroleum hydrocarbon migration pattern in the area under the worst-case scenario. The remediation scenario simulations indicate that do nothing approach will likely not achieve the target water quality within 50 years. Similarly, complete source removal approach will also likely not achieve the target water quality within 50 years. Partial source removal could be expected to remove a significant portion of the contaminant mass, but would increase the rate of contaminant recharge in the short to medium term. The pump-treat-reinject simulation indicates that the option appears feasible and could achieve a reduction in the area of the 0.01 mg/L TPH contour area for both Raudhatain and Umm Al-Aish by 35 and 30%, respectively, within 50 years. The rate of improvement and the completion date would depend on a range of factors such as bore field arrangements, pumping rates, reinjection water quality and additional volumes being introduced and require further optimisation and field pilot trials.

  6. Superfund Green Remediation

    Science.gov (United States)

    Green remediation is the practice of considering all environmental effects of site cleanup and incorporating options – like the use of renewable energy resources – to maximize the environmental benefits of cleanups.

  7. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  8. Paleolithic nutrition: twenty-five years later.

    Science.gov (United States)

    Konner, Melvin; Eaton, S Boyd

    2010-12-01

    A quarter century has passed since the first publication of the evolutionary discordance hypothesis, according to which departures from the nutrition and activity patterns of our hunter-gatherer ancestors have contributed greatly and in specifically definable ways to the endemic chronic diseases of modern civilization. Refinements of the model have changed it in some respects, but anthropological evidence continues to indicate that ancestral human diets prevalent during our evolution were characterized by much lower levels of refined carbohydrates and sodium, much higher levels of fiber and protein, and comparable levels of fat (primarily unsaturated fat) and cholesterol. Physical activity levels were also much higher than current levels, resulting in higher energy throughput. We said at the outset that such evidence could only suggest testable hypotheses and that recommendations must ultimately rest on more conventional epidemiological, clinical, and laboratory studies. Such studies have multiplied and have supported many aspects of our model, to the extent that in some respects, official recommendations today have targets closer to those prevalent among hunter-gatherers than did comparable recommendations 25 years ago. Furthermore, doubts have been raised about the necessity for very low levels of protein, fat, and cholesterol intake common in official recommendations. Most impressively, randomized controlled trials have begun to confirm the value of hunter-gatherer diets in some high-risk groups, even as compared with routinely recommended diets. Much more research needs to be done, but the past quarter century has proven the interest and heuristic value, if not yet the ultimate validity, of the model.

  9. Twenty-first century vaccines

    Science.gov (United States)

    Rappuoli, Rino

    2011-01-01

    In the twentieth century, vaccination has been possibly the greatest revolution in health. Together with hygiene and antibiotics, vaccination led to the elimination of many childhood infectious diseases and contributed to the increase in disability-free life expectancy that in Western societies rose from 50 to 78–85 years (Crimmins, E. M. & Finch, C. E. 2006 Proc. Natl Acad. Sci. USA 103, 498–503; Kirkwood, T. B. 2008 Nat. Med 10, 1177–1185). In the twenty-first century, vaccination will be expected to eliminate the remaining childhood infectious diseases, such as meningococcal meningitis, respiratory syncytial virus, group A streptococcus, and will address the health challenges of this century such as those associated with ageing, antibiotic resistance, emerging infectious diseases and poverty. However, for this to happen, we need to increase the public trust in vaccination so that vaccines can be perceived as the best insurance against most diseases across all ages. PMID:21893537

  10. Twenty years of Triga Mark I reactor use

    International Nuclear Information System (INIS)

    Stasiulevicius, R.; Maretti Junior, F.

    1981-01-01

    This work is a report on the 20 years of activities of the Triga Mark I, research reactor located in Belo Horizonte, Brazil. It contains also a list of publications, details of operation and improvements introduced in the reactor as well as some perspectives for its future. (A.C.A.S.)

  11. Can Item Keyword Feedback Help Remediate Knowledge Gaps?

    Science.gov (United States)

    Feinberg, Richard A; Clauser, Amanda L

    2016-10-01

    In graduate medical education, assessment results can effectively guide professional development when both assessment and feedback support a formative model. When individuals cannot directly access the test questions and responses, a way of using assessment results formatively is to provide item keyword feedback. The purpose of the following study was to investigate whether exposure to item keyword feedback aids in learner remediation. Participants included 319 trainees who completed a medical subspecialty in-training examination (ITE) in 2012 as first-year fellows, and then 1 year later in 2013 as second-year fellows. Performance on 2013 ITE items in which keywords were, or were not, exposed as part of the 2012 ITE score feedback was compared across groups based on the amount of time studying (preparation). For the same items common to both 2012 and 2013 ITEs, response patterns were analyzed to investigate changes in answer selection. Test takers who indicated greater amounts of preparation on the 2013 ITE did not perform better on the items in which keywords were exposed compared to those who were not exposed. The response pattern analysis substantiated overall growth in performance from the 2012 ITE. For items with incorrect responses on both attempts, examinees selected the same option 58% of the time. Results from the current study were unsuccessful in supporting the use of item keywords in aiding remediation. Unfortunately, the results did provide evidence of examinees retaining misinformation.

  12. A dialogue-centric approach to environmental-remediation decision-making - 59115

    International Nuclear Information System (INIS)

    Boucher, Laurel; Clark, James F.

    2012-01-01

    This paper outlines a multi-step approach to streamline and enhance the decision-making process that guides environmental remediation. The inability of the responsible party and the various stakeholders to reach agreement on the remediation plan can delay the remediation, result in financial penalties, and lead to the development of an adversarial stance that inhibits the ability of the parties to work together in a creative and constructive manner. The approach presented by the authors is designed to expand dialogue in a way that moves it beyond technical or fiscal matters by addressing what the authors describe as the 'hidden barriers' to productive dialogue. These 'hidden barriers' include: self-interests, the perception as to how people are being treated, a lack of clarity or poor management of responsibilities and accountabilities, unclear or convoluted communication protocols, and an underlying tone of conflict and cynicism. A key element of the multi-step approach outlined in this paper is the process of uncovering these 'hidden barriers' and addressing them in a way that turns discourse into collaboration. The paper describes a model the authors have used to streamline and enhance the process of creating sustainable agreements both for the U.S. Department of Energy's Office of Environmental Management as well as the U.S. Department of Defense for a variety of environmental remediation projects. The results of this approach include the acceleration of an environmental clean-up from a projected 19 years to 11 years, the development of innovative technical strategies, the reduction of a major backlog of environmental proposals requiring review and comment, and the distinction accorded one group of being recognized as a model of effective partnering. The approach described has widespread implications not only because its use can be expanded to include a multitude of decision-making applications but also because of the impact it creates by expanding both the

  13. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  14. Environmental Modelling of Remediation of Urban Contaminated Areas. Report of the Urban Remediation Working Group of EMRAS Theme 2

    International Nuclear Information System (INIS)

    2012-01-01

    The Urban Remediation Working Group of the International Atomic Energy Agency's EMRAS (Environmental Modelling for RAdiation Safety) programme was concerned with remediation assessment for urban areas contaminated with dispersed radionuclides. Types of events that could result in dispersal or deposition of radionuclides in an urban situation include both intentional and unintentional events, and releases could range from major events involving a nuclear facility to small events such as a transportation accident. The primary objective of the Urban Remediation Working Group was (1) to test and improve the prediction of dose rates and cumulative doses to humans for urban areas contaminated with dispersed radionuclides, including prediction of changes in radionuclide concentrations or dose rates as a function of location and time; (2) to identify the most important pathways for human exposure; and (3) to predict the reduction in radionuclide concentrations, dose rates, or doses expected to result from various countermeasures or remediation efforts. Specific objectives of the Working Group have included (1) the identification of realistic scenarios for a wide variety of situations, (2) comparison and testing of approaches and models for assessing the significance of a given contamination event and for guiding decisions about countermeasures or remediation measures implemented to reduce doses to humans or to clean up the contaminated area, and (3) improving the understanding of processes and situations that affect the spread of contamination to aid in the development of appropriate models and parameter values for use in assessment of these situations. The major activities of the Working Group have included three areas. The first of these was a review of the available modelling approaches and computer models for use in assessing urban contamination and potential countermeasures or remediation activities. The second area of work was a modelling exercise based on data

  15. Hanford Site Tank Waste Remediation System

    International Nuclear Information System (INIS)

    1993-05-01

    The US Department of Energy's (DOE) Hanford Site in southeastern Washington State has the most diverse and largest amount of highly radioactive waste of any site in the US. High-level radioactive waste has been stored in large underground tanks since 1944. A Tank Waste Remediation System Program has been established within the DOE to safely manage and immobilize these wastes in anticipation of permanent disposal in a geologic repository. The Hanford Site Tank Waste Remediation System Waste Management 1993 Symposium Papers and Viewgraphs covered the following topics: Hanford Site Tank Waste Remediation System Overview; Tank Waste Retrieval Issues and Options for their Resolution; Tank Waste Pretreatment - Issues, Alternatives and Strategies for Resolution; Low-Level Waste Disposal - Grout Issue and Alternative Waste Form Technology; A Strategy for Resolving High-Priority Hanford Site Radioactive Waste Storage Tank Safety Issues; Tank Waste Chemistry - A New Understanding of Waste Aging; Recent Results from Characterization of Ferrocyanide Wastes at the Hanford Site; Resolving the Safety Issue for Radioactive Waste Tanks with High Organic Content; Technology to Support Hanford Site Tank Waste Remediation System Objectives

  16. Twenty years of immunocontraceptive research: lessons learned.

    Science.gov (United States)

    Miller, Lowell A; Fagerstone, Kathleen A; Eckery, Douglas C

    2013-12-01

    The National Wildlife Research Center (NWRC) began immunocontraception vaccine research by testing porcine zona pellucida (PZP) on white-tailed deer (Odocoileus virginianus). Early PZP research demonstrated that PZP induced infertility; however, increased length of the rut was observed in PZP-treated deer. An alternative vaccine using a keyhole limpet hemocyanin-gonadotropin-releasing hormone (KLH-GnRH) conjugate formulated with modified Freund's adjuvant was developed at NWRC. Suppression of GnRH has reduced reproduction in both sexes but is most effective in females. This vaccine was effective in preventing contraception in female deer for several years after a prime and boost. Due to adverse side effects of Freund's adjuvant, NWRC developed a new adjuvant called AdjuVac, a mineral oil/surfactant adjuvant with the addition of Mycobacterium avium as an immunostimulant. The price of KLH prompted a search for a more economical hemocyanin carrier protein for the GnRH peptide. Blue protein, derived from the mollusk Concholepas concholepas, proved to be a successful option. Formulation improvements resulted in a vaccine that can be effective as a single injection for multiple years, now called GonaCon. GonaCon is registered with the Environmental Protection Agency (EPA) for use in white-tailed deer in urban/suburban areas and for wild horses (Equus caballus) and burros (Equus asinus). Future GonaCon applications may include reducing reproduction to manage populations of other wildlife species, such as prairie dogs (Cynomys ludovicianus) in urban areas and suppressing reproduction to reduce the spread of venereal diseases such as brucellosis. Research is being conducted to develop a GnRH vaccine used in combination with the rabies vaccine to control population growth in free-roaming dogs, with the secondary effect of managing the spread of rabies. The EPA would regulate all these uses. Research is also ongoing on a GnRH vaccine to delay the onset of adrenocortical

  17. Process for determining the remediation category of hazardous substance sites

    International Nuclear Information System (INIS)

    Sieben, A.K.

    1994-01-01

    An evaluation process has been developed that aids in selecting the appropriate remediation category of hazardous substance sites. Three general remediation categories have been established: No further Action: Potential Early Action: and Defer for RI/FS or Transition/Decontamination and Decommissioning. This evaluation method is a preliminary screening process only and will not identify the most appropriate remediation alternative for each site. The remedy selection process can proceed only after a remediation category is determined for each site. All sites are evaluated at a preliminary screening level to determine the general remediation category. After the first screen, a secondary evaluation is performed on both the PEA sites and the DEFER sites. For PEAs, this secondary evaluation will incorporate additional specific factors, such as a screening level risk assessment. For the DEFER sites feasibility factors will be used to distinguish between the sites which should undergo a normal RI/FS and the sites which will be recommended to be remediated in association with D ampersand D of buildings. Ultimately, all of the sites will be placed into one of four remediation categories

  18. Rail transportation of Fernald remediation waste

    International Nuclear Information System (INIS)

    Fellman, R.T.; Lojek, D.A.; Motl, G.P.; Weddendorf, W.K.

    1995-01-01

    Remediation of the Department of Energy (DOE) Fernald site located north of Cincinnati will generate large quantities of low-level radwaste. This volume includes approximately 1,050,000 tons of material to be removed from eight waste pits comprising Operable Unit 1 (OU-1). The remedial alternative selected includes waste material excavation, drying and transportation by rail to a burial site in the arid west for disposal. Rail transportation was selected not only because rail transportation is safer than truck transportation, but also because of the sheer magnitude of the project and the availability of bulk rail car unloading facilities at a representative disposal site. Based upon current waste quantity estimates as presented in the Feasibility Study for OUI, a fully-loaded 47-car unit train would depart the Fernald site weekly for five years. This paper illustrates the steps taken to obtain agency and public acceptance of the Record of Decision for the remedy which hinged on rail transportation. A preliminary, but detailed, rail transportation plan was prepared for the project to support a series of CERCLA public meetings conducted in late 1994. Some of the major issues addressed in the plan included the following: (1) Scope of project leading to selection of rail transportation; (2) Waste classification; (3) Rail Company overview; (4) Train configuration and rail car selection; (5) Routing; (6) Safety; (7) Prior Notification Requirements (8) Emergency Response. A series of three public meetings identified a number of issues of prime concern to Fernald stakeholders. Following resolution of these issues during the public comment period, a Record of Decision (ROD) approving implementation of the rail transportation strategy was approved pending incorporation of EPA and State of Ohio comments on December 22, 1994

  19. Remediation of Soil at Nuclear Sites

    International Nuclear Information System (INIS)

    Holmes, R.; Boardman, C.; Robbins, R; Fox, Robert Vincent; Mincher, Bruce Jay

    2000-01-01

    As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste

  20. Changes in Reef Fish Abundances Associated with the Introduction of Indo-Pacific Lionfish to the Florida Keys National Marine Sanctuary: a Twenty Year Time Series.

    Science.gov (United States)

    Hepner, M.; Muller-Karger, F. E.; Gittings, S.; Stallings, C.

    2016-02-01

    The Marine Biodiversity Observation Network (MBON) is a partnership between academic, private, and government researchers seeking to understand how marine biodiversity changes over long periods of time. In this context, a study of the multi-agency Reef Visual Census (RVC) data, collected over twenty years in the Florida Keys National Marine Sanctuary (FKNMS), was analyzed to measure possible changes in reef fish abundances as a result of possible predation by lionfish predation or due to related trophic cascading. Lionfish were first sighted in the FKNMS in January 2009, with abundances and frequency of occurrence increasing three to six fold throughout the sanctuary by 2011. Their high consumption rates of smaller fish, coupled with their rapidly increasing densities may be having a significant effect on coral reef fish communities. The study compares the natural variability in reef fish abundances from 1994-2009 in the FKNMS, 15 years prior to the first lionfish detected in the sanctuary, to changes in reef fish abundances 5 years after the invasion. The MBON project also aims to develop environmental DNA (eDNA) technology for conducting biodiversity assessments. eDNA is an emerging technique that seeks to quantify biodiversity in an area by obtaining genetic material directly from environmental samples (soil, sediment, water, etc.) without any obvious signs of biological source material. All marine organisms shed DNA into their surrounding habitat, leaving a "fingerprint." Similar to forensic science, the DNA can be collected from seawater and analyzed to determine what species were recently present. The MBON team is evaluating whether eDNA can be used to adequately monitor reef fish biodiversity in coral reef ecosystems. We will compare species detected in our samples to the taxonomic composition of reef fish communities at the sample site as recorded over the past twenty years in the Reef Visual Census data.

  1. Provincial labour market study : mould remediation industry

    International Nuclear Information System (INIS)

    2003-06-01

    Indoor exposure to mold can be problematic to human health, and some molds are considered to be toxigenic. The emergent mold remediation industry in Ontario is fragmented, with various different standards, training and certification processes. This report investigated the labour market for mold remediation workers, with particular reference to training needs and priorities. Research was derived from a literature review in order to analyze the economic, legal, technical and social context of the mold remediation industry. Data on the organized work force were obtained from records of the International Union of Painters and Allied Trades, the Labour Force Historical Review 2002, and various publications. Population data from the Ontario government and Statistics Canada were also used. Surveys of workers and employers were conducted with questionnaires. Results of the surveys indicated that mold remediation projects currently constitute a minority share of most companies' business. However, the importance of mold remediation projects is expected to increase, and industry self-regulation is the most likely scenario for the development of standards and related training programs. It was suggested that the creation of an industry body representing key stakeholder constituencies or the legitimization of an existing industry organization will reduce fragmentation and facilitate research, standard setting and certification, as well as improve marketing and education. If the demand for mold remediation services increases as anticipated, the industry will face the challenge of remaining competitive in the province's projected labour market due to shortages in personnel. There was a strong consensus between employers and workers in the mold remediation industry regarding the need for skills upgrading and compulsory certification. It was concluded that leadership is needed in the development and delivery of training programs, standard setting, recruitment and retention and

  2. 6 CFR 17.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-01-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of March 6, 2003... 6 Domestic Security 1 2010-01-01 2010-01-01 false Remedial and affirmative action and self... NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  3. 43 CFR 41.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-10-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Remedial and affirmative action and self... NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  4. 14 CFR 1253.110 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-01-01

    .... 264. (c) Self-evaluation. Each recipient education institution shall, within one year of September 29... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Remedial and affirmative action and self... NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE...

  5. 34 CFR 106.3 - Remedial and affirmative action and self-evaluation.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Remedial and affirmative action and self-evaluation. 106.3 Section 106.3 Education Regulations of the Offices of the Department of Education OFFICE FOR.... (c) Self-evaluation. Each recipient education institution shall, within one year of the effective...

  6. Hazardous waste treatment and environmental remediation research

    International Nuclear Information System (INIS)

    1989-01-01

    Los Alamos National Laboratory (LANL) is currently evaluating hazardous waste treatment and environmental remediation technologies in existence and under development to determine applicability to remediation needs of the DOE facilities under the Albuquerque Operations Office and to determine areas of research need. To assist LANL is this effort, Science Applications International Corporation (SAIC) conducted an assessment of technologies and monitoring methods that have been demonstrated or are under development. The focus of this assessment is to: (1) identify existing technologies for hazardous waste treatment and environmental remediation of old waste sites; (2) identify technologies under development and the status of the technology; (3) assess new technologies that need development to provide adequate hazardous waste treatment and remedial action technologies for DOD and DOE sites; and (4) identify hazardous waste and remediation problems for environmental research and development. There are currently numerous research and development activities underway nationwide relating to environmental contaminants and the remediation of waste sites. To perform this effort, SAIC evaluated current technologies and monitoring methods development programs in EPA, DOD, and DOE, as these are the primary agencies through which developmental methods are being demonstrated. This report presents this evaluation and provides recommendations as to pertinent research needs or activities to address waste site contamination problems. The review and assessment have been conducted at a programmatic level; site-specific and contaminant-specific evaluations are being performed by LANL staff as a separate, related activity

  7. 77 FR 12293 - PCBs Bulk Product v. Remediation Waste

    Science.gov (United States)

    2012-02-29

    .... Remediation Waste AGENCY: Environmental Protection Agency (EPA). ACTION: Request for Public Comment. SUMMARY... biphenyl (PCB) disposal regulations regarding PCB bulk product and PCB remediation waste. The proposed... regarding PCB bulk product and PCB remediation waste under regulations promulgated at 40 CFR part 761. The...

  8. Completion of the South Alligator Valley remediation, Northern Territory, Australia - -16198

    International Nuclear Information System (INIS)

    Waggitt, Peter; Fawcett, Mike

    2009-01-01

    13 uranium mines operated in the South Alligator Valley of Australia's Northern Territory between 1953 and 1963. At the end of operations the mines, and associated infrastructure, were simply abandoned. As this activity preceded environmental legislation by about 15 years there was neither any obligation, nor attempt, at remediation. In the 1980's it was decided that the whole area should become an extension of the adjacent World Heritage, Kakadu National Park. As a result the Commonwealth Government made an inventory of the abandoned mines and associated facilities in 1986. This established the size and scope of the liability and formed the framework for a possible future remediation project. The initial program for the reduction of physical and radiological hazards at each of the identified sites was formulated in 1989 and the works took place from 1990 to 1992. But even at this time, as throughout much of the valley's history, little attention was being paid to the long term aspirations of traditional land owners. The traditional Aboriginal owners, the Gunlom Land Trust, were granted freehold Native Title to the area in 1996. They immediately leased the land back to the Commonwealth Government so it would remain a part of Kakadu National Park, but under joint management. One condition of the lease required that all evidence of former mining activity be remediated by 2015. The consultation, and subsequent planning processes, for a final remediation program began in 1997. A plan was agreed in 2003 and, after funding was granted in 2005, works implementation commenced in 2007. An earlier paper described the planning and consultation stages, experience involving the cleaning up of remnant uranium mill tailings and other mining residues; and the successful implementation of the initial remediation works. This paper deals with the final planning and design processes to complete the remediation programme, which is due to occur in 2009. The issues of final containment

  9. 14 CFR 1212.800 - Civil remedies.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Civil remedies. 1212.800 Section 1212.800... Comply With Requirements of This Part § 1212.800 Civil remedies. Failure to comply with the requirements of the Privacy Act and this part could subject NASA to civil suit under the provisions of 5 U.S.C...

  10. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    International Nuclear Information System (INIS)

    Hunt, A.; Jones, G.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete

  11. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    Energy Technology Data Exchange (ETDEWEB)

    Post, Thomas C. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); Strom, Dean [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States); Beulow, Laura [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)

    2013-07-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  12. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  13. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  14. Steam Injection For Soil And Aquifer Remediation

    Science.gov (United States)

    The purpose of this Issue Paper is to provide to those involved in assessing remediation technologies for specific sites basic technical information on the use of steam injection for the remediation of soils and aquifers that are contaminated by...

  15. TPACK Updated to Measure Pre-Service Teachers' Twenty-First Century Skills

    Science.gov (United States)

    Valtonen, Teemu; Sointu, Erkko; Kukkonen, Jari; Kontkanen, Sini; Lambert, Matthew C.; Mäkitalo-Siegl, Kati

    2017-01-01

    Twenty-first century skills have attracted significant attention in recent years. Students of today and the future are expected to have the skills necessary for collaborating, problem solving, creative and innovative thinking, and the ability to take advantage of information and communication technology (ICT) applications. Teachers must be…

  16. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  17. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  18. Cryogenic air separation: the last twenty years

    International Nuclear Information System (INIS)

    Grenier, M.; Petit, P.

    1986-01-01

    In the last 20 years cryogenic air separation plant sizes have increased from 150 tons per day to 2800 tons per day. Progressively reversing heat exchangers have replaced regenerators. However, with this arrangement, the quantity of pure product output is limited to about 50% of the air input. With the appearance on the market of molecular sieve, another arrangement was developed, which allows one to produce a combined pure product flow equivalent to 85% of the air input. Recently, there has been a strong tendency for the reversing exchangers to be superseded by this arrangement. Due to the ever increasing cost of energy, optimization studies are today pushed much further than they used to be; as a consequence there have been major changes in the size of equipment, improvements in the machinery, and simultaneous developments in instrumentation

  19. Speech Remediation of Long-Term Stuttering

    Directory of Open Access Journals (Sweden)

    Betty L. McMicken

    2012-09-01

    Full Text Available This research article describes the remediation of moderate stuttering in an adult client who experienced speech dysfluency for more than 40 years. Treatment took place at an urban residential rehabilitation mission where the client was court sentenced for a history of felonies and current narcotic sales and use. In conjunction with the operant conditioning instruction of the rehabilitation mission, the Ryan Fluency Program was implemented along with the initial use of pause time in response to the complex needs of the client. The article provides an overview of the assessment (Fluency Interviews, Criterion Tests and treatment program. At present, 2.5 years post-initiation of treatment, the client has reported and been observed to have achieved smooth, forward-flowing, natural sounding speech throughout his work environment, family interaction, and daily life.

  20. Rate of Contamination Removal of Two Phyto-remediation Sites at the DOE Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Lewis, A.C.; Baird, D.R.

    2006-01-01

    This paper describes applications of phyto-remediation at the Portsmouth Gaseous Diffusion Plant (PORTS), a Department of Energy (DOE) Facility that enriched uranium from the early 1950's until 2000. Phyto-remediation has been implemented to assist in the removal of TCE (trichloroethylene) in the groundwater at two locations at the PORTS facility: the X-740 area and the X-749/X-120 area. Phyto-remediation technology is based on the ability of certain plants species (in this case hybrid poplar trees) and their associated rhizo-spheric microorganisms to remove, degrade, or contain chemical contaminants located in the soil, sediment, surface water, groundwater, and possibly even the atmosphere. Phyto-remediation technology is a promising clean-up solution for a wide variety of pollutants and sites. Mature trees, such as the hybrid poplar, can consume up to 3,000 gallons of groundwater per acre per day. Organic compounds are captured in the trees' root systems. These organic compounds are degraded by ultraviolet light as they are transpired along with the water vapor through the leaves of the trees. The phyto-remediation system at the X-740 area encompasses 766 one-year old hybrid poplar trees (Populus nigra x nigra, Populus nigra x maximowiczii, and Populus deltoides x nigra) that were planted 10 feet apart in rows 10 feet to 20 feet apart, over an area of 2.6 acres. The system was installed to manage the VOC contaminant plume. At the X749/X-120 area, a phyto-remediation system of 2,640 hybrid poplar trees (Populus nigra x maximowiczii) was planted in seven areas/zones to manage the VOC contaminant plume. The objectives of these systems are to remove contamination from the groundwater and to prevent further migration of contaminants. The goal of these remediation procedures is to achieve completely mature and functional phyto-remediation systems within two years of the initial planting of the hybrid poplar trees at each planting location. There is a direct

  1. Use of LCA as decision support for the selection of remedial strategies for remediation of contaminated soil and groundwater

    DEFF Research Database (Denmark)

    Lemming, Gitte; Hauschild, Michael Zwicky; Bjerg, Poul Løgstrup

    2009-01-01

    , there is a trade-off between obtaining local beneficial effects from the remediation and generating environmental impacts on the regional and global scale due to the remedial actions. Therefore there is a need for including the impact of soil contaminants that will potentially leach to the groundwater, e......Groundwater is the dominant source of drinking water in Denmark and the general policy is to maintain the groundwater as a clean source of drinking water. The risk of groundwater contamination is therefore often the prime reason for remediating a contaminated site. Chlorinated solvents are among...... the contaminants most frequently found to be threatening the groundwater quality in Denmark and worldwide. Life cycle assessment has recently been applied as part of decision support for contaminated site management and subsurface remediation techniques. Impacts in the groundwater compartment have only gained...

  2. Capital in the Twenty-First Century

    DEFF Research Database (Denmark)

    Hansen, Per H.

    2014-01-01

    Review essay on: Capital in the Twenty-First Century. By Thomas Piketty . Translated by Arthur Goldhammer . Cambridge, Mass.: The Belknap Press of Harvard University Press, 2014. viii + 685 pp......Review essay on: Capital in the Twenty-First Century. By Thomas Piketty . Translated by Arthur Goldhammer . Cambridge, Mass.: The Belknap Press of Harvard University Press, 2014. viii + 685 pp...

  3. The effect of Soil Temperature on Electrodialytic Remediation

    DEFF Research Database (Denmark)

    Kristensen, Iben Vernegren

    1999-01-01

    The electrodialytic remediation of copper, zinc and lead contaminated kaolin was studied at three different temperatures (0-39 degrees centrigrate). It is shown that an increase in temperature increases the rate of remediation for all three metals. Copper and zinc shows similar rate constants......, while for lead, the rate constant obtained are significantly smaller. The increased remediation rate is presumed to be due mainly to the lowering of the viscosity....

  4. Groundwater Remediation in a Floodplain Aquifer at Shiprock, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Dave [Navarro Research and Engineering; Miller, David [Navarro Research and Engineering; Kautsky, Mark [U. S. Department of Energy, Office of Legacy Management; Dander, David [Navarro Research and Engineering; Nofchissey, Joni [Navajo Nation Division of Natural Resources

    2016-03-06

    A uranium- and vanadium-ore-processing mill operated from 1954 to 1968 within the Navajo Nation near Shiprock, New Mexico. By September 1986, all tailings and structures on the former mill property were encapsulated in a disposal cell built on top of two existing tailings piles on the Shiprock site (the site) [1]. Local groundwater was contaminated by multiple inorganic constituents as a result of the milling operations. The U.S. Department of Energy (DOE) took over management of the site in 1978 as part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The DOE Office of Legacy Management currently manages ongoing activities at the former mill facility, including groundwater remediation. Remediation activities are designed primarily to reduce the concentrations and total plume mass of the mill-related contaminants sulfate, uranium, and nitrate. In addition to contaminating groundwater in alluvial and bedrock sediments directly below the mill site, ore processing led to contamination of a nearby floodplain bordering the San Juan River. Groundwater in a shallow alluvial aquifer beneath the floodplain is strongly influenced by the morphology of the river channel as well as changing flows in the river, which provides drainage for regional runoff from the San Juan Mountains of Colorado. As part of a recent study of the floodplain hydrology, a revised conceptual model was developed for the alluvial aquifer along with an updated status of contaminant plumes that have been impacted by more than 10 years of groundwater pumping for site remediation purposes. Several findings from the recent study will be discussed here.

  5. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

  6. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ''may affect'' the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA)

  7. Environmental consequences of the Chernobyl accident and their remediation: Twenty years of experience. Report of the UN Chernobyl Forum Expert Group 'Environment' (EGE). Working material

    International Nuclear Information System (INIS)

    2005-08-01

    The purpose of this report is to provide an up-to-date evaluation of the environmental effects of the 26 April 1986 accident at the Chernobyl Nuclear Power Plant. Even though it is now nearly 20 years after the accident and substantial monies have been spent on such evaluations, there are still many conflicting reports and rumours. This joint report has been developed with the full cooperation of the United Nations (UN) family of relevant organisations and with political representatives from the three more affected countries: Ukraine, Belarus, and the Russian Federation. In addition, recognised scientific experts from the three countries and additional international experts provided the basis for the preparation of reports for review by the actual members of the Chernobyl Forum. The - Chernobyl Forum - is a high-level political forum whose suggestion for existence was initiated by the International Atomic Energy Agency (IAEA) in cooperation with the Food and Agriculture Organisation (FAO), the United Nations Office for Coordination of Humanitarian Affairs (OCHA), the United Nations Development Programme (UNDP), the United Nations Environment Programme (UNEP), the United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR), the World Health Organisation (WHO), and the World Bank, as well as the competent authorities of Belarus, the Russian Federation, and Ukraine. The organisational meeting of the Chernobyl Forum was held on 3-5 February 2003, at which time the decision was reached to establish the Forum as an ongoing entity of the above named organisations. Thus, the organisational meeting of the Forum decided to establish the Chernobyl Forum as a series of managerial, expert and public meetings in order to generate authoritative consensual statements on the health effects attributable to radiation exposure arising from the accident and the environmental consequences induced by the released radioactive materials, to provide advice on

  8. Environmental consequences of the Chernobyl accident and their remediation: Twenty years of experience. Report of the UN Chernobyl Forum Expert Group 'Environment' (EGE). Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-08-01

    The purpose of this report is to provide an up-to-date evaluation of the environmental effects of the 26 April 1986 accident at the Chernobyl Nuclear Power Plant. Even though it is now nearly 20 years after the accident and substantial monies have been spent on such evaluations, there are still many conflicting reports and rumours. This joint report has been developed with the full cooperation of the United Nations (UN) family of relevant organisations and with political representatives from the three more affected countries: Ukraine, Belarus, and the Russian Federation. In addition, recognised scientific experts from the three countries and additional international experts provided the basis for the preparation of reports for review by the actual members of the Chernobyl Forum. The - Chernobyl Forum - is a high-level political forum whose suggestion for existence was initiated by the International Atomic Energy Agency (IAEA) in cooperation with the Food and Agriculture Organisation (FAO), the United Nations Office for Coordination of Humanitarian Affairs (OCHA), the United Nations Development Programme (UNDP), the United Nations Environment Programme (UNEP), the United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR), the World Health Organisation (WHO), and the World Bank, as well as the competent authorities of Belarus, the Russian Federation, and Ukraine. The organisational meeting of the Chernobyl Forum was held on 3-5 February 2003, at which time the decision was reached to establish the Forum as an ongoing entity of the above named organisations. Thus, the organisational meeting of the Forum decided to establish the Chernobyl Forum as a series of managerial, expert and public meetings in order to generate authoritative consensual statements on the health effects attributable to radiation exposure arising from the accident and the environmental consequences induced by the released radioactive materials, to provide advice on

  9. Natural bioventing remediation from tidal wave action at a field site

    International Nuclear Information System (INIS)

    Kampbell, D.H.; Kittel, J.A.

    1996-01-01

    A remediation research study has been implemented at a jet fuel spill site on an island airport. A buried pipeline fracture several years ago resulted in a fuel spill exceeding 160,000 gallons. The site hydrogeology is a fragmented coral matrix with fresh water overlying more dense salt water. Water table fluctuations of about two feet occur once every twelve hours from tidal action. The research approach being pursued is to recover free-phase floating petroleum liquid using vacuum-mediated subsurface skimming wells. The vacuum will create an active vadose zone aeration to enhance aerobic biodegradation processes and vaporization of fuel. Once the floating fuel is removed, a natural bioventing action caused by tidal oscillations will complete remediation of the spill site

  10. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  11. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  12. About Chernobyl - Twenty Years Later; Propos sur Tchernobyl

    Energy Technology Data Exchange (ETDEWEB)

    Tubiana, M

    2006-07-01

    The author discusses the reactor accident of Chernobyl, the information on its consequences so contradictory in the former USSR countries, the status of the effects observed, the forecasting concerning the onset of cancers in the coming years among the populations that were exposed to radiations, the public opinion facing the pessimists. He concludes on the lessons which can be drawn from Chernobyl. (A.L.B.)

  13. [Optimization of electrode configuration in soil electrokinetic remediation].

    Science.gov (United States)

    Liu, Fang; Fu, Rong-Bing; Xu, Zhen

    2015-02-01

    Electric field distributions of several different electrode configurations in non-uniform electric field were simulated using MATLAB software, and the electrokinetic remediation device was constructed according to the best electrode configuration. The changes of soil pH and heavy metal residues in different parts of the device during the electrokinetic remediation were also studied. The results showed that, in terms of the effectiveness of the electric field strength, the square (1-D-1) and hexagonal (2-D-3) were the optimal electrode configurations for one-dimensional and two-dimensional respectively and the changes of soil pH, the removal of heavy metals and the distribution of electric field were closely related to one another. An acidic migration band, which could prevent premature precipitation of heavy metals to a certain extent and promote electrokinetic removal of heavy metals, was formed gradually along with the remediation in the whole hexagon device when the cathodic pH was controlled during the remediation of the four cationic metallic ions, Cd2+, Ni2+, Pb2+ and Cu2+. After 480-hour remediation, the total removals of Cd, Ni, Pb and Cu were 86.6%, 86.2%, 67.7% and 73.0%, respectively. Remediation duration and replacement frequency of the electrodes could be adjusted according to the repair target.

  14. IAEA Expert Remediation Mission to Japan Issues Preliminary Report

    International Nuclear Information System (INIS)

    2013-01-01

    food safety measures has protected consumers and improved consumer confidence in farm produce. A comprehensive programme to monitor fresh water sources such as rivers, lakes and ponds is ongoing, including extensive food monitoring of both wild and cultivated freshwater fish. The Mission encouraged the Japanese government to strengthen its efforts to explain to the public that an additional individual radiation dose of 1 millisievert per year (mSv/y), which it has announced as a long-term goal, cannot be achieved in a short time by decontamination work alone. In remediation situations, with appropriate consideration of the prevailing circumstances, any level of individual radiation dose in the range of 1 to 20 mSv/y is acceptable and in line with international standards and the recommendations of the relevant international organisations such as the IAEA, International Commission on Radiological Protection (ICRP), United Nations Scientific Committee on the Effect of Atomic Radiation (UNSCEAR) and World Health Organisation (WHO). The Mission encouraged the relevant institutions in Japan to assess the role that the Nuclear Regulation Authority (NRA) could play in the independent review of the remediation activities, particularly those required for the long term. The Mission also encouraged the relevant organisations to conduct safety assessments of the facilities and activities for the long-term management of contaminated materials, and to allow for their independent review. The Mission Team acknowledged that the Japanese authorities have implemented a practical option for remediating the region's extensive forest areas, taking a limited approach by removing material under the trees in a 20-meter buffer strip adjacent to residences, farmland and public spaces. It recommended concentrating efforts on areas that bring the greatest benefit in reducing doses to the public, while avoiding damage to the ecological functioning of the forest where possible. The 16-person team

  15. Electrodialytic remediation of soil polluted with heavy metals

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Ottosen, Lisbeth M.; Hansen, Lene

    1999-01-01

    In this paper, the importance of some parameters for the efficiency of electrodialytic soil remediation are evaluated. The parameters investigated are pH, the limiting current density and the adding of desorbing agents to the soil. Three parameters are found to be of greatest importance. Results...... show that the electrodialytic soil remediation can be optimized by understanding and adjusting of these parameters. For scaling up of the remediation method these parameters are of crucial importance....

  16. Remediation of uranium in-situ leaching area at Straz Pod Ralskem, Czech Republic

    Energy Technology Data Exchange (ETDEWEB)

    Vokal, Vojtech; Muzak, Jiri; Ekert, Vladimir [DIAMO, s. e., TUU, Pod Vinici 84, Straz pod Ralskem, 471 27 (Czech Republic)

    2013-07-01

    A large-scale development in exploration and production of uranium ores in the Czech Republic was done in the 2nd half of the 20. century. Many uranium deposits were discovered in the territory of the Czech Republic. One of the most considerable deposits in the Czech Republic is the site Hamr na Jezere - Straz pod Ralskem where both mining methods - the underground mining and the acidic in-situ leaching - were used. The extensive production of uranium led to widespread environmental impacts and contamination of ground waters. Over the period of 'chemical' leaching of uranium (ca. 32 years), a total of more than 4 million tons of sulphuric acid and other chemicals have been injected into the ground. Most of the products (approx. 99.5 %) of the acids reactions with the rocks are located in the Cenomanian aquifer. The contamination of Cenomanian aquifer covers the area larger then 27 km{sup 2}. The influenced volume of groundwater is more than 380 million m{sup 3}. The total amount of dissolved SO{sub 4}{sup 2-} is about 3.6 million tons. After 1990 a large-scale environmental program was established and the Czech government decided to liquidate the ISL Mine and start the remediation in 1996. The remediation consists of contaminated groundwater pumping, removing of the contaminants and discharging or reinjection of treated water. Nowadays four main remedial technological installations with sufficient capacity for reaching of the target values of remedial parameters in 2037 are used - the 'Station for Acid Solutions Liquidation No. One', the 'Mother liquor reprocessing' station, the 'Neutralization and Decontamination Station NDS 6' and the 'Neutralization and Decontamination Station NDS 10'. It is expected that the amount of withdrawn contaminants will vary from 80 000 to 120 000 tons per year. Total costs of all remediation activities are expected to be in excess of 2 billion EUR. (authors)

  17. Integrated approach to planning the remediation of sites undergoing decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Responding to the needs of Member States, the IAEA has launched an environmental remediation guidance initiative dealing with the issues of radioactive contamination world wide. Its aim is to collate and disseminate information concerning the key issues affecting environmental remediation of contaminated sites. This IAEA initiative includes the development of documents that report on remediation technologies available, best practices, and information and guidance concerning (a) Strategy development for environmental remediation; (b) Characterization and remediation of contaminated sites and contaminated groundwater; (c) Management of waste and residues from mining and milling of uranium and thorium; (d) Decommissioning of buildings; (e) A database for contaminated sites. The subject of this present report concerns the integration of decommissioning and remediation activities at sites undergoing decommissioning and this fits within the first category of guidance documentation (strategy development). This document addresses key strategic planning issues. It is intended to provide practical advice and complement other reports that focus on decommissioning and remediation at nuclear facilities. The document is designed to encourage site remediation activities that take advantage of synergies with decommissioning in order to reduce the duplication of effort by various parties and minimize adverse impacts on human health, the environment, and costs through the transfer of experience and knowledge. To achieve this objective, the document is designed to help Member States gain perspective by summarizing available information about synergies between decommissioning and remediation, strategic planning and project management and planning tools and techniques to support decision making and remediation. Case studies are also presented as to give concrete examples of the theoretical elements elaborated in the documents. This publication investigates the potential synergies

  18. Cognitive Remediation in Schizophrenia: Current Status and Future Perspectives

    Science.gov (United States)

    Deste, Giacomo; De Peri, Luca

    2013-01-01

    Objectives. This study is aimed to review the current scientific literature on cognitive remediation in schizophrenia. In particular, the main structured protocols of cognitive remediation developed for schizophrenia are presented and the main results reported in recent meta-analyses are summarized. Possible benefits of cognitive remediation in the early course of schizophrenia and in subjects at risk for psychosis are also discussed. Methods. Electronic search of the relevant studies which appeared in the PubMed database until April 2013 has been performed and all the meta-analyses and review articles on cognitive remediation in schizophrenia have been also taken into account. Results. Numerous intervention programs have been designed, applied, and evaluated, with the objective of improving cognition and social functioning in schizophrenia. Several quantitative reviews have established that cognitive remediation is effective in reducing cognitive deficits and in improving functional outcome of the disorder. Furthermore, the studies available support the usefulness of cognitive remediation when applied in the early course of schizophrenia and even in subjects at risk of the disease. Conclusions. Cognitive remediation is a promising approach to improve real-world functioning in schizophrenia and should be considered a key strategy for early intervention in the psychoses. PMID:24455253

  19. 40 CFR 761.269 - Sampling liquid PCB remediation waste.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Sampling liquid PCB remediation waste..., AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste in Accordance with § 761.61(a)(2) § 761.269 Sampling liquid PCB remediation waste. (a) If the liquid is single phase...

  20. Present status of the Zavratec remediation project

    International Nuclear Information System (INIS)

    Zeleznik, N.; Stepisnik, M.; Mele, I.

    1997-01-01

    In 1992 the responsibility for the remediation of the temporary storage of radioactive waste near Zavratec was assigned to the Agency for Radwaste Management. The project was divided into two phases. First, in a study, different options for remediation were considered. In the second phase, performed in 1996, the measurements, inventorying and repacking of radioactive waste were carried out. Simultaneously with these activities a programme for covering public relations was prepared. One of the results of the public relation campaign is also a 15-minute video film, which was prepared from documentary material recorded during remedial activities, and will be presented here. (author)

  1. Electrochemical remediation of copper contaminated clay soils

    Energy Technology Data Exchange (ETDEWEB)

    Korolev, V.A.; Babakina, O.A.; Mitojan, R.A. [Moscow State Univ. (Russian Federation)

    2001-07-01

    The study objective focused on electrochemical remediation copper polluted soils in the presence of adjuvant substances and conditions that are more effective for the treatment. Some of these substances were studied in different researches. Moreover, authors obtained a result of extraction copper rate higher than 90%. In this connection the following problems were set: - Influence organic and inorganic substances on copper mobility in soil under the DC current. - Moisture effect on copper migration in clay. - Electrochemical remediation soils different mineralogical composition. - A washing conditions contribution to electrochemical remediation of soil from copper. - Accuracy rating experimental dates. (orig.)

  2. Remediation in Canadian medical residency programs: Established and emerging best practices.

    Science.gov (United States)

    Shearer, Cindy; Bosma, Mark; Bergin, Fiona; Sargeant, Joan; Warren, Andrew

    2018-02-23

    Policies to guide remediation in postgraduate medical education exist in all Canadian medical schools. This study examines concordance between these policies and processes, and published "best practices" in remediation. We conducted a literature review to identify best practices in the area of remediation. We then reviewed remediation policies from all 13 English medical schools in Canada other than our own and conducted interviews with key informants from each institution. Each policy and interview transcript pair was then reviewed for evidence of pre-defined "best practices." Team members also noted additional potential policy or process enablers of successful remediation. Most policies and processes aligned with some but not all published best practices. For instance, all participating schools tailored remediation strategies to individual resident needs, and a majority encouraged faculty-student relationships during remediation. Conversely, few required the teaching of goal-setting, strategic planning, self-monitoring, and self-awareness. In addition, we identified avoidance of automatic training extension and the use of an educational review board to support the remediation process as enablers for success. Remediation policies and practices in Canada align well with published best practices in this area. Based on key informant opinions, flexibility to avoid training extension and use of an educational review board may also support optimal remediation outcomes.

  3. Microbial Remediation of Metals in Soils

    Science.gov (United States)

    Hietala, K. A.; Roane, T. M.

    Of metal-contaminated systems, metal-contaminated soils present the greatest challenge to remediation efforts because of the structural, physical, chemical, and biological heterogeneities encountered in soils. One of the confounding issues surrounding metal remediation is that metals can be readily re-mobilized, requiring constant monitoring of metal toxicity in sites where metals are not removed. Excessive metal content in soils can impact air, surface water, and groundwater quality. However, our understanding of how metals affect organisms, from bacteria to plants and animals, and our ability to negate the toxicity of metals are in their infancies. The ubiquity of metal contamination in developing and industrialized areas of the world make remediation of soils via removal, containment, and/or detoxification of metals a primary concern. Recent examples of the health and environmental consequences of metal contamination include arsenic in drinking water (Wang and Wai 2004), mercury levels in fish (Jewett and Duffy 2007), and metal uptake by agricultural crops (Howe et al. 2005). The goal of this chapter is to summarize the traditional approaches and recent developments using microorganisms and microbial products to address metal toxicity and remediation.

  4. Adaptive remediation using portable treatment units

    International Nuclear Information System (INIS)

    Bahowick, S.; Folsom, E.; Pico, T.

    1996-01-01

    Lawrence Livermore National Laboratory (LLNL) is using adaptive remediation to optimize their environmental restoration strategy. Adaptive remediation uses hydrostratigraphic analysis to gain a better understanding of the subsurface characteristics, hydraulic tests to optimize contaminant transport models, and Portable Treatment Units (PTUs) as an alternative to fixed facilities. Hydrostratigraphic analysis is an optimization tool that improves the ability to identify and target contaminant migration pathways, identify the relationship between plumes and source areas, and better define hydraulic capture areas. Hydraulic tests, performed with PTUs, provide valuable data about subsurface characteristics. As clean up progresses, PTUs can be moved to the appropriate extraction wells to optimize contaminant mass removal. PTUs can also be placed to support innovative treatment technologies such as steam injection and microbial filters. Construction of PTUs will reduce by one-half the capital costs of building the rest of the fixed treatment system planned in the Record of Decision. Regulatory agencies are receptive to the use of the PTUs because the same treatment technology is being used and the PTUs will be able to clean up the plume cheaper and faster. Using adaptive remediation, LLNL is more effectively implementing remediation plans, improving cleanup time, and reducing project costs

  5. Phytoextraction of arsenic-contaminated soil with Pteris vittata in Henan Province, China: comprehensive evaluation of remediation efficiency correcting for atmospheric depositions.

    Science.gov (United States)

    Lei, Mei; Wan, Xiaoming; Guo, Guanghui; Yang, Junxing; Chen, Tongbin

    2018-01-01

    Research on the appropriate method for evaluating phytoremediation efficiency is limited. A 2-year field experiment was conducted to investigate phytoremediation efficiency using the hyperaccumulator Pteris vittata on an arsenic (As)-contaminated site. The remediation efficiency was evaluated through the removal rate of As in soils and extraction rate of heavy metals in plants. After 2 years of remediation, the concentration of total As in soils decreased from 16.27 mg kg -1 in 2012 to 14.58 mg kg -1 in 2014. The total remediation efficiency of As was 10.39% in terms of the removal rate of heavy metals calculated for soils, whereas the remediation efficiency calculated from As uptake by P. vittata was 16.09%. Such a discrepancy aroused further consideration on the potential input of As. A large amount of As was brought in by atmospheric emissions, which possibly biased the calculation of remediation efficiency. In fact, considering also the atmospheric depositions of As, the corrected removal rate of As from soil was 16.57%. Therefore, the results of this work suggest that (i) when evaluating the phytoextraction efficiency, the whole input and output cycle of the element of interest in the targeted ecosystem must be considered, and (ii) P. vittata has the potential to be used to remediate As-contaminated soils in Henan Province, China.

  6. Commercial mitigation techniques used in remediating a 2200 pCi/L public building

    International Nuclear Information System (INIS)

    Davidson, J.G.

    1990-01-01

    This paper reports on commercial mitigation techniques used in remediating a 2200 pCi/L public building. In March of 1989 EPA and Pa. DER officials were amazed to discover a school in Pennsylvania with levels in its library of 2200 pCi/L. The library was a 30 year old, three story slab-on-grade structure more like a commercial building than a typical school structure. It had three separate and complex HVAC systems. Initial diagnostics indicated radon levels under the slab at over 80,000 pCi/L. Further investigations revealed major entry routes and a HVAC system terribly out of balance. Remediation consisted of installing a complex sub-slab depressurization system with an exterior commercial fan unit, major entry route sealing, and working closely with a mechanical contractor to bring the HVAC systems back into balance. Initial post remediation testing showed a 99% drop in radon levels. Refinements to the system are still in progress

  7. Calculating the Costs of Remedial Placement Testing. CCRC Analytics

    Science.gov (United States)

    Rodríguez, Olga; Bowden, Brooks; Belfield, Clive; Scott-Clayton, Judith

    2015-01-01

    Of the more than one million new students who enter community colleges each fall, nearly 70 percent are assigned to remedial coursework. The cost of providing this coursework is high, yet evidence about the effectiveness of remediation is not compelling. In addition, many students are misclassified in the remedial assessment process. In order for…

  8. Mercury contaminated sediment sites—An evaluation of remedial options

    Energy Technology Data Exchange (ETDEWEB)

    Randall, Paul M., E-mail: randall.paul@epa.gov [U.S. Environmental Protection Agency, Office of Research and Development, National Risk Management Research Laboratory, 26 West Martin Luther King Drive, Cincinnati, OH 45268 (United States); Chattopadhyay, Sandip, E-mail: Sandip.Chattopadhyay@tetratech.com [Tetra Tech, Inc., 250 West Court Street, Suite 200W, Cincinnati, OH 45202 (United States)

    2013-08-15

    Mercury (Hg) is a naturally-occurring element that is ubiquitous in the aquatic environment. Though efforts have been made in recent years to decrease Hg emissions, historically-emitted Hg can be retained in the sediments of aquatic bodies where they may be slowly converted to methylmercury (MeHg). Consequently, Hg in historically-contaminated sediments can result in high levels of significant exposure for aquatic species, wildlife and human populations consuming fish. Even if source control of contaminated wastewater is achievable, it may take a very long time, perhaps decades, for Hg-contaminated aquatic systems to reach relatively safe Hg levels in both water and surface sediment naturally. It may take even longer if Hg is present at higher concentration levels in deep sediment. Hg contaminated sediment results from previous releases or ongoing contributions from sources that are difficult to identify. Due to human activities or physical, chemical, or biological processes (e.g. hydrodynamic flows, bioturbation, molecular diffusion, and chemical transformation), the buried Hg can be remobilized into the overlying water. Hg speciation in the water column and sediments critically affect the reactivity (i.e. conversion of inorganic Hg(II) to MeHg), transport, and its exposure to living organisms. Also, geochemical conditions affect the activity of methylating bacteria and its availability for methylation. This review paper discusses remedial considerations (e.g. key chemical factors in fate and transport of Hg, source characterization and control, environmental management procedures, remediation options, modeling tools) and includes practical case studies for cleaning up Hg-contaminated sediment sites. -- Highlights: ► Managing mercury-contaminated sediment sites are challenging to remediate. ► Remediation technologies are making a difference in managing these sites. ► Partitioning plays a dominant role in the distribution of mercury species. ► Mathematical

  9. Twenty years later: The war did (not begin at Maksimir an anthropological analysis of the media narratives about a never ended football game

    Directory of Open Access Journals (Sweden)

    Đorđević Ivan

    2012-01-01

    Full Text Available The aim of this work is an analysis of the media narratives about the never ended football match between Dynamo Zagreb and Red Star Belgrade on May 13 1990. The article focuses on the media coverage twenty years after the incident in the context of the game's acquired mythic status, symbolically marking the beginning of the war in former Yugoslavia. The object of the analysis are Serbian and Croatian media with the aim of revealing the strategies of representing this event in the period of the normalization of the relations in the region. [Projekat Ministarstva nauke Republike Srbije, br. 177026: Cultural Heritage and Identity

  10. Strategic Considerations for the Sustainable Remediation of Nuclear Installations

    International Nuclear Information System (INIS)

    Miller, Susan; Wilson, Ian; Decung, Fabien; Ollivier Dehaye, Catherine; Pellenz, Gilles; Palut-Laurent, Odile; Nitzsche, Olaf; Rehs, Bernd; Altavilla, Massimo; Osimani, Celso; Florya, Sergey; Revilla, Jose-Luis; Efraimsson, Henrik; Baines, Kim; Clark, Anna; Cruickshank, Julian; Mitchell, Nick; Mobbs, Shelly; Orr, Peter; Abu-Eid, Rateb Boby; Durham, Lisa; Morse, John; Walker, Stuart; Weber, Inge; ); Monken-Fernandes, Horst; )

    2016-01-01

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable sites, or parts of sites, to be reused. Although such activities are relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic drawbacks and benefits. Site remediation should thus be sustainable and result in an overall net benefit. This report draws on recent experience of NEA member countries in nuclear site remediation during decommissioning in order to identify strategic considerations for the sustainable remediation of subsurface contamination - predominantly contaminated soil and groundwater - to describe good practice, and to make recommendations for further research and development. It provides insights for the decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so as to ensure the sustainable remediation of nuclear sites, now and in the future. (authors)

  11. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  12. Virtual Remediation Versus Methylphenidate to Improve Distractibility in Children With ADHD: A Controlled Randomized Clinical Trial Study.

    Science.gov (United States)

    Bioulac, Stéphanie; Micoulaud-Franchi, Jean-Arthur; Maire, Jenna; Bouvard, Manuel P; Rizzo, Albert A; Sagaspe, Patricia; Philip, Pierre

    2018-03-01

    Virtual environments have been used to assess children with ADHD but have never been tested as therapeutic tools. We tested a new virtual classroom cognitive remediation program to improve symptoms in children with ADHD. In this randomized clinical trial, 51 children with ADHD (7-11 years) were assigned to a virtual cognitive remediation group, a methylphenidate group, or a psychotherapy group. All children were evaluated before and after therapy with an ADHD Rating Scale, a Continuous Performance Test (CPT), and a virtual classroom task. After therapy by virtual remediation, children exhibited significantly higher numbers of correct hits on the virtual classroom and CPT. These improvements were equivalent to those observed with methylphenidate treatment. Our study demonstrates for the first time that a cognitive remediation program delivered in a virtual classroom reduces distractibility in children with ADHD and could replace methylphenidate treatment in specific cases.

  13. Remedial principles and meaningful engagement in education ...

    African Journals Online (AJOL)

    This article evaluates the meaningful engagement doctrine in the education rights jurisprudence of the Constitutional Court in the light of a set of normative principles developed by Susan Sturm for evaluating participatory public law remedies. It commences by identifying four principles for evaluating participatory remedies ...

  14. Considering bioavailability in the remediation of heavy metal contaminated sites

    Directory of Open Access Journals (Sweden)

    Leita L.

    2013-04-01

    Full Text Available Many years of research have demonstrated that instead of the total concentration of metals in soil, bioavailability is the key to understand the environmental risk derived by metals, since adverse effects are related only to the biologically available forms of these elements. The knowledge of bioavailability can decrease the uncertainties in evaluating exposure in human and ecological risk assessment. At the same time, the efficiency of remediation treatments could be greatly influenced by availability of the contaminants. Consideration of the bioavailability processes at contaminated sites could be useful in site-specific risk assessment: the fraction of mobile metals, instead of total content should be provided as estimates of metal exposure. Moreover, knowledge of the chemical forms of heavy metals in soils is a critical component in the evaluation of applicability of different remediation technologies such as phytoremdiation or soil washing.

  15. Characterization and remediation of highly radioactive contaminated soil at Hanford

    International Nuclear Information System (INIS)

    Buckmaster, M.A.; Erickson, J.K.

    1993-09-01

    The Hanford Site, Richland, Washington, contains over 1,500 identified waste sites and numerous groundwater plumes that will be characterized and remediated over the next 30 years. As a result of the Hanford Federal Facility Agreement and Consent Order, the US Department of Energy (DOE) has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI/FS is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves highly radioactive and chemically contaminated soils. The initial phase of site characterization was designed to assess the nature and extent of contamination associated with the source waste sites within the 200-BP-1 operable unit. Characterization activities consisted of drilling and sampling, chemical and physical analysis of samples, and development of a conceptual vadose zone model. These data were then used. to develop remedial alternatives during the FS evaluation. The preferred alternative resulting from the RI/FS process for the 200-BP-1 operable unit is to construct a surface isolation barrier. The multi-layered earthen barrier will be designed to prevent migration of contaminants resulting from water infiltration, biointrusion, and wind and water erosion

  16. Remediation trials of crude oil contaminated soil using different ...

    African Journals Online (AJOL)

    A 3 month remediation trial of the use of detergent and sawdust in different combination forms in the restoration of a crude oil contaminated tropical soil was investigated. 8 remediation treatments labeled A – H in addition to the control (I) were used in 10 kg soil artificially polluted with 300 ml crude oil each. Remediation ...

  17. Strategic considerations for the sustainable remediation of nuclear installations.

    Science.gov (United States)

    Mobbs, S; Orr, P; Weber, I

    2017-08-05

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable the sites or parts of the sites to be reused. Although this is relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic detriments and benefits that should be taken into account. Recent experience of OECD Nuclear Energy Agency (NEA) member countries in the remediation of contaminated land, predominantly contaminated soil and groundwater, on nuclear sites during decommissioning has been assessed by an NEA task group. The experience was used to identify strategic considerations for nuclear site remediation, to consider the application of sustainability principles to nuclear site remediation, to describe good practice, and to make recommendations for further research and development. The key aspects that were identified were that 1) site remediation should be sustainable by resulting in an overall net benefit; and 2) an adaptive approach is essential in order to take into account the inherent uncertainty associated with the decommissioning and site remediation timescales. A report describing the findings was published by OECD/NEA in 2016. The conclusions provide insights to decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so that they can achieve sustainable remediation of nuclear sites, now and in the future. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. The summer institute in clinical dental research methods: still going and growing after twenty years.

    Science.gov (United States)

    Derouen, Timothy A; Wiesenbach, Carol

    2012-11-01

    The first Summer Institute in Clinical Dental Research Methods, a faculty development program at the University of Washington, was offered in the summer of 1992 for sixteen participants. The primary objective of the program was to give clinical faculty members in dentistry an introduction to and an understanding of the fundamental principles and methods used in good clinical research. In the twentieth offering of the institute in 2011, there were thirty-five participants, and over the twenty institutes, there has been a cumulative total of 463 participants who have come from thirty U.S. states as well as forty-three countries outside the United States. The curriculum has expanded from the initial offering of biostatistics, clinical epidemiology, behavioral research methods, and ethics in clinical research to now include clinical trials, grantsmanship, data analysis, an elective in molecular biology, and a team project that provides participants with hands-on experience in research proposal development as members of an interdisciplinary team. Enrollment has doubled since the first year, yet exit evaluations of the program content have remained consistently high (rated as very good to excellent). One of the indicators of program quality is that at least 50 percent of recent participants indicated that they attended because the program was recommended by colleagues who had attended. There seems to be an ever-increasing pool of dental faculty members who are eager to learn more about clinical research methodology through the institute despite the intensive demands of full-time participation in a six-week program.

  19. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U

  20. Radioactive Tank Waste Remediation Focus Area. Technology summary

    International Nuclear Information System (INIS)

    1995-06-01

    In February 1991, DOE's Office of Technology Development created the Underground Storage Tank Integrated Demonstration (UST-ID), to develop technologies for tank remediation. Tank remediation across the DOE Complex has been driven by Federal Facility Compliance Agreements with individual sites. In 1994, the DOE Office of Environmental Management created the High Level Waste Tank Remediation Focus Area (TFA; of which UST-ID is now a part) to better integrate and coordinate tank waste remediation technology development efforts. The mission of both organizations is the same: to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat, concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to both the public and regulators. The TFA has focused on four DOE locations: the Hanford Site in Richland, Washington, the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho, the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site (SRS) in Aiken, South Carolina

  1. [Twenty-five years of screening eugenics in Spain].

    Science.gov (United States)

    Mérida Donoso, Salvador

    2012-01-01

    Over the past 25 years, the incidence of newborns with congenital defects in Spain has fallen by 56.7% primarily due to the practice of "fetal risk" abortion, after prenatal diagnosis. In some cases, such as people with Down syndrome, the strategy involves the removal of 80-90% of those affected in pregnancy. After presenting the techniques used today and statistical data, we will make a reflection about the ethical justification for prenatal diagnosis programs and practice of "eugenic" abortion.

  2. Technologies for remediation of radioactively contaminated sites

    International Nuclear Information System (INIS)

    1999-06-01

    This report presents particulars on environmental restoration technologies (control and treatment) which can be applied to land based, radioactively contaminated sites. The media considered include soils, groundwater, surface water, sediments, air, and terrestrial and aquatic vegetation. The technologies addressed in this report can be categorized as follows: self-attenuation (natural restoration); in-situ treatment; removal of contamination; ex-situ treatment; and transportation and final disposal. The report provides also background information about and a general approach to remediation of radioactively contaminated sites as well as some guidance for the selection of a preferred remediation technology. Examples of remediation experience in Australia and Canada are given it annexes

  3. Technologies for remediation of radioactively contaminated sites

    Energy Technology Data Exchange (ETDEWEB)

    1999-06-01

    This report presents particulars on environmental restoration technologies (control and treatment) which can be applied to land based, radioactively contaminated sites. The media considered include soils, groundwater, surface water, sediments, air, and terrestrial and aquatic vegetation. The technologies addressed in this report can be categorized as follows: self-attenuation (natural restoration); in-situ treatment; removal of contamination; ex-situ treatment; and transportation and final disposal. The report provides also background information about and a general approach to remediation of radioactively contaminated sites as well as some guidance for the selection of a preferred remediation technology. Examples of remediation experience in Australia and Canada are given it annexes Refs, figs, tabs

  4. Drama, dissensus, remediation and a fluttering butterfly

    DEFF Research Database (Denmark)

    Kusk, Hanne

    2017-01-01

    Why is it important to pay attention to democracy and polyphony when working with remediation in a multimodal drama project in introductory schooling? This question is elucidated and investigated in this article on the basis of a drama project case study conducted at Hundborg Friskole. The study...... is analysed on the basis of the concepts of remediation (Bolter and Grusin 1999; Christoffersen 2009), dissensus (Biesta 2013; Rancière 2013), dialogue and polyphony (Dysthe, Bernhardt and Esbjørn 2012). The examples in the investigation show how dialogue, polyphony and dissensus influence the art......-based process of remediation, and how this impacts children’s democratic education....

  5. Electrochemical Remediation of Dredged Material for Beneficial Use

    DEFF Research Database (Denmark)

    Pedersen, Anne Juul; Gardner, Kevin H.

    2003-01-01

    Two different methods, electrodialytic and electroosmotic remediation, were used to demonstrate the potential of electrochemical methods for remediation of contaminated harbor sediments. In two three-week-long laboratory experiments using electrodialysis and electroosmosis, respectively...

  6. The association of students requiring remediation in the internal medicine clerkship with poor performance during internship.

    Science.gov (United States)

    Hemann, Brian A; Durning, Steven J; Kelly, William F; Dong, Ting; Pangaro, Louis N; Hemmer, Paul A

    2015-04-01

    To determine whether the Uniformed Services University (USU) system of workplace performance assessment for students in the internal medicine clerkship at the USU continues to be a sensitive predictor of subsequent poor performance during internship, when compared with assessments in other USU third year clerkships. Utilizing Program Director survey results from 2007 through 2011 and U.S. Medical Licensing Examination (USMLE) Step 3 examination results as the outcomes of interest, we compared performance during internship for students who had less than passing performance in the internal medicine clerkship and required remediation, against students whose performance in the internal medicine clerkship was successful. We further analyzed internship ratings for students who received less than passing grades during the same time period on other third year clerkships such as general surgery, pediatrics, obstetrics and gynecology, family medicine, and psychiatry to evaluate whether poor performance on other individual clerkships were associated with future poor performance at the internship level. Results for this recent cohort of graduates were compared with previously published findings. The overall survey response rate for this 5 year cohort was 81% (689/853). Students who received a less than passing grade in the internal medicine clerkship and required further remediation were 4.5 times more likely to be given poor ratings in the domain of medical expertise and 18.7 times more likely to demonstrate poor professionalism during internship. Further, students requiring internal medicine remediation were 8.5 times more likely to fail USMLE Step 3. No other individual clerkship showed any statistically significant associations with performance at the intern level. On the other hand, 40% of students who successfully remediated and did graduate were not identified during internship as having poor performance. Unsuccessful clinical performance which requires remediation in

  7. Best Practices for Fuel System Contamination Detection and Remediation

    Science.gov (United States)

    2016-01-15

    The University of Dayton Research Institute Best Practices for Fuel System Contamination Detection and Remediation Final Report Marlin D... Remediation Executive Summary: Fuel contamination is a broad term commonly applied to anything that causes a fuel test to fail quality assurance...Statement A: Approved for public release: distribution unlimited. 1 Best Practices for Fuel System Contamination Detection and Remediation Contents

  8. 48 CFR 22.1504 - Violations and remedies.

    Science.gov (United States)

    2010-10-01

    ... to cooperate as required in accordance with the clause at 52.222-19, Child Labor Cooperation with Authorities and Remedies, with an investigation of the use of forced or indentured child labor by an Inspector... contractor knew of the violation. (b) Remedies. (1) The contracting officer may terminate the contract. (2...

  9. Laboratory Experiment on Electrokinetic Remediation of Soil

    Science.gov (United States)

    Elsayed-Ali, Alya H.; Abdel-Fattah, Tarek; Elsayed-Ali, Hani E.

    2011-01-01

    Electrokinetic remediation is a method of decontaminating soil containing heavy metals and polar organic contaminants by passing a direct current through the soil. An undergraduate chemistry laboratory is described to demonstrate electrokinetic remediation of soil contaminated with copper. A 30 cm electrokinetic cell with an applied voltage of 30…

  10. Principle of progressive (gradual use of contractual remedies

    Directory of Open Access Journals (Sweden)

    Bazil OGLINDĂ

    2014-12-01

    Full Text Available In this study, we intend to answer to the question whether, in the modern contract law, in general, and in Romanian contract law, in particular, the creditor may resort almost discretionary to remedies (contractual sanctions such as termination, rescission without being opposed that he should have resorted to other more appropriate remedies. In order to answer to this question, we find it extremely useful to define the term of contractual remedy and to analyse the correlation of this principle with other principles of modern contract law. Also, last but not least, we intend to define the principle of progressive (gradual use of the contractual remedies and to detail the vocation (legal nature of this principle in the modern contract law, having as starting point the provisions of the new Romanian Civil Code.

  11. Remediation General Permit (RGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the National Pollutant Discharge Elimination System (NPDES) General Permit for Remediation Activity Discharges – the Remediation General Permit in MA (MAG910000) and NH (NHG910000).

  12. Phyto-remediation of contaminated soils

    International Nuclear Information System (INIS)

    Chagvardieff, P.

    2014-01-01

    Some plants can be selected for their capacity to extract radionuclides from the soil, on the contrary other plants can be chosen for being able to produce food grade products in a contaminated environment. Modern genetic methods can be used to enhance these abilities and turn some plants into an efficient means in the managing of contaminated areas. The DEMETERRES project that gathers different research organisations like CEA, IRSN and INRA and industrial partners like AREVA and VEOLIA aims at developing innovative bio-technologies like phyto-extraction and environment friendly physico-chemical technologies for the remediation of contaminated soils. This project was launched in 2013 on a 5-year scheme and is expected to lead to industrial applications. (A.C.)

  13. Steam and electroheating remediation of tight soils

    Energy Technology Data Exchange (ETDEWEB)

    Balshaw-Biddle, K.; Oubre, C.L.; Ward, C.H. [eds.; Dablow, J.F. III; Pearce, J.A.; Johnson, P.C.

    2000-07-01

    In the past few decades the need for soil remediation has become urgent, even more necessary--innovative, cost effective methods. Steam and Electroheating Remediation of Tight Soils presents the results of a field study testing the cleanup of semi-volatile fuels from tight soils using combination of hydraulic fracturing and soil heating technologies.

  14. Strategic planning for remediation projects

    International Nuclear Information System (INIS)

    Tapp, J.W.

    1995-01-01

    Remediation projects may range from a single leaking storage tank to an entire plant complex or producing oil and gas field. Strategic planning comes into play when the contamination of soil and groundwater is extensive. If adjacent landowners have been impacted or the community at large is concerned about the quality of drinking water, then strategic planning is even more important. (1) To manage highly complex interrelated issues--for example, the efforts expended on community relations can alter public opinion, which can impact regulatory agency decisions that affect cleanup standards, which can...and so on. (2) To ensure that all potential liabilities are managed--for example, preparation for the defense of future lawsuits is essential during site investigation and remediation. (3) To communicate with senior management--when the remediation team provides a strategic plan that includes both technical and business issues, senior management has the opportunity to become more involved and make sound policy decisions. The following discusses the elements of a strategic plan, who should participate in it, and the issues that should be considered

  15. Uranium mill tailings remedial action technology

    International Nuclear Information System (INIS)

    Hartley, J.N.; Gee, G.W.

    1984-01-01

    The uranium milling process involves the hydrometallurgical extraction of uranium from ores and the resultant generation of large quantities of waste referred to as tailings. Uranium mill tailings have been identified as requiring remediation because they contain residual radioactive material that is not removed in the milling process. Potential radiation exposure can result from direct contact with the tailings, from radon gas emitted by the tailings, and from radioactive contamination of groundwater. As a result, the technology developed under the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) and the US Nuclear Regulatory Commission (NRC) Uranium Recovery Program have focused on radon control, groundwater contamination and the long-term protection of the containment system. This paper briefly summarizes the UMTRAP and NRC remedial action technology development. 33 references, 9 figures, 5 tables

  16. Almost remediation of saltwater spills at E and P sites

    International Nuclear Information System (INIS)

    Carty, D.J.

    1995-01-01

    At exploration and production (E and P) sites crude spills restricted to topsoil are often self-remediating, but salt spills rarely are. Most soils naturally biodegrade crude. Without appropriate human intervention, brine spills can result in decades of barren land and seriously degrade surface water and aquifers. Servicing the E and P industry are remediation practitioners with a limited array of often expensive remediation concepts and materials which they hope will work, and sometimes do. Unfortunately, many remediation practitioners are unfamiliar with, or disregard, the natural physical, chemical, and biotic complexity of the soil and aquatic media. All too often this results in exacerbating injury to an already damaged ecosystem. Likewise, important cultural factors such as public relations, environmental regulations, property rights, and water rights are also overlooked until after implementation of an ill-advised or illegal remediation design has been initiated. A major issue is determining what constitutes ''successful'' remediation of a brine spill. Environmental managers have long sought one or two universally applicable fast and cheap amendment/treatment protocols for all their diverse multi-state salt affected spill scenarios. This presentation describes aspects of common spill-affected ecosystems which must be considered to achieve ''successful'' remediation

  17. Predicting the phytoextraction duration to remediate heavy metal contaminated soils

    NARCIS (Netherlands)

    Koopmans, G.F.; Römkens, P.F.A.M.; Song, J.; Temminghoff, E.J.M.; Japenga, J.

    2007-01-01

    The applicability of phytoextraction to remediate soils contaminated with heavy metals (HMs) depends on, amongst others, the duration before remediation is completed. The impact of changes in the HM content in soil occurring during remediation on plant uptake has to be considered in order to obtain

  18. 75 FR 55340 - Recovery Fact Sheet 9580.100, Mold Remediation

    Science.gov (United States)

    2010-09-10

    ...] Recovery Fact Sheet 9580.100, Mold Remediation AGENCY: Federal Emergency Management Agency, DHS. ACTION... accepting comments on Recovery Fact Sheet RP9580.100, Mold Remediation. DATES: Comments must be received by... 20472-3100. II. Background The Recovery Fact Sheet RP9580.100, Mold Remediation, identifies the expenses...

  19. New technologies in decommissioning and remediation

    International Nuclear Information System (INIS)

    Fournier, Vincent

    2016-01-01

    New and emerging technologies are making decommissioning and remediation more cost effective, faster and safer. From planning to execution and control, the use of new technologies is on the rise. Before starting decommissioning or environmental remediation, experts need to plan each step of the process, and to do that, they first need a clear idea of the characteristics of the structure and the level of radiation that they can expect to encounter

  20. Spectral induced polarization for monitoring electrokinetic remediation processes

    Science.gov (United States)

    Masi, Matteo; Losito, Gabriella

    2015-12-01

    Electrokinetic remediation is an emerging technology for extracting heavy metals from contaminated soils and sediments. This method uses a direct or alternating electric field to induce the transport of contaminants toward the electrodes. The electric field also produces pH variations, sorption/desorption and precipitation/dissolution of species in the porous medium during remediation. Since heavy metal mobility is pH-dependent, the accurate control of pH inside the material is required in order to enhance the removal efficiency. The common approach for monitoring the remediation process both in laboratory and in the field is the chemical analysis of samples collected from discrete locations. The purpose of this study is the evaluation of Spectral Induced Polarization as an alternative method for monitoring geochemical changes in the contaminated mass during remediation. The advantage of this technique applied to field-scale is to offer higher resolution mapping of the remediation site and lower cost compared to the conventional sampling procedure. We carried out laboratory-scale electrokinetic remediation experiments on fine-grained marine sediments contaminated by heavy metal and we made Spectral Induced Polarization measurements before and after each treatment. Measurements were done in the frequency range 10- 3-103 Hz. By the deconvolution of the spectra using the Debye Decomposition method we obtained the mean relaxation time and total chargeability. The main finding of this work is that a linear relationship exists between the local total chargeability and pH, with good agreement. The observed behaviour of chargeability is interpreted as a direct consequence of the alteration of the zeta potential of the sediment particles due to pH changes. Such relationship has a significant value for the interpretation of induced polarization data, allowing the use of this technique for monitoring electrokinetic remediation at field-scale.