  1. Strategic planning for remediation projects

    International Nuclear Information System (INIS)

    Tapp, J.W.

    1995-01-01

    Remediation projects may range from a single leaking storage tank to an entire plant complex or producing oil and gas field. Strategic planning comes into play when the contamination of soil and groundwater is extensive. If adjacent landowners have been impacted or the community at large is concerned about the quality of drinking water, then strategic planning is even more important. (1) To manage highly complex interrelated issues--for example, the efforts expended on community relations can alter public opinion, which can impact regulatory agency decisions that affect cleanup standards, which can...and so on. (2) To ensure that all potential liabilities are managed--for example, preparation for the defense of future lawsuits is essential during site investigation and remediation. (3) To communicate with senior management--when the remediation team provides a strategic plan that includes both technical and business issues, senior management has the opportunity to become more involved and make sound policy decisions. The following discusses the elements of a strategic plan, who should participate in it, and the issues that should be considered

  2. Economics of biofiltration for remediation projects

    International Nuclear Information System (INIS)

    Yudelson, J.M.; Tinari, P.D.

    1995-01-01

    Biofilters with granular activated carbon (GAC) filter backup units offer substantial savings compared to conventional GAC filters and catalytic/thermal oxidation (Catox) units in controlling emissions of volatile organic compounds (VOCs) from petroleum remediation projects. Provided that the biofilter supplier is willing to satisfy the client's and consultant's risk-management concerns, biofilters offer anew method for reducing the cost of remediation projects, with savings of up to $10,000 (24%) per facility in 24-month projects and up to $16,000 (32%) per facility in 36-month projects for simple gas station remediation projects. Savings will be greater for longer projects and projects with higher average contaminant loadings

  3. Present status of the Zavratec remediation project

    International Nuclear Information System (INIS)

    Zeleznik, N.; Stepisnik, M.; Mele, I.

    1997-01-01

    In 1992 the responsibility for the remediation of the temporary storage of radioactive waste near Zavratec was assigned to the Agency for Radwaste Management. The project was divided into two phases. First, in a study, different options for remediation were considered. In the second phase, performed in 1996, the measurements, inventorying and repacking of radioactive waste were carried out. Simultaneously with these activities a programme for covering public relations was prepared. One of the results of the public relation campaign is also a 15-minute video film, which was prepared from documentary material recorded during remedial activities, and will be presented here. (author)

  4. Kerr Hollow Quarry Remediation Project

    International Nuclear Information System (INIS)

    Walker, K.L.

    1993-01-01

    The Kerr Hollow Quarry is a 3-acre flooded limestone quarry located near the Y-12 Facility on the Oak Ridge Reservation. The quarry was used in the 1940s as a source of construction material for the Department of Energy in Oak Ridge, Tennessee. Its use was discontinued in the early 1950s, and it was allowed to flood with water. The quarry presently has a maximum water depth of approximately 55 ft. During the period between the early 1950s until about 1988, the quarry was used for the treatment and disposal of a variety of materials including water-reactive, alkali metals, shock-sensitive chemicals, and compressed gas cylinders. For some of these materials, the treatment consisted of dropping the vessels containing the materials into the quarry from a high bluff located on one side of the quarry. The vessels were then punctured by gun shot, and the materials were allowed to react with the water and sink to the bottom of the quarry. Very few disposal records exist for the period from 1952 to 1962. The records after that time, from 1962 until 1988, indicate some 50 t of hazardous and nonhazardous materials were disposed of in the quarry. This report documents remediation efforts that have taken place at the quarry beginning in September 1990

  5. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  6. Communication activities during remediation project of Zavratec

    International Nuclear Information System (INIS)

    Kukovica, T.; Mele, I.

    1996-01-01

    The remediation project of temporary storage of radioactive waste near village Zavratec is under way. The Agency for Radwaste Management was assigned to perform this project by the Slovenian government. Radioactive waste was stored on site of Zavratec in 1961. That year an accident has occurred at Oncological institute in Ljubljana in which several rooms and some equipment have been contaminated by the content of radium applicator. Radioactive waste from decontamination was transported and stored in an old Italian military barrack near village Zavratec. The storage became known to public in eighties by the TV report. Since that time it is frequently the subject of public polemics and discussions. This year the first part of remediation project, i.e. the activity measurements and sorting of radioactive waste is taking place. It is planned to conclude the project next year. For successful realization of the project the PR activities, specially the communication with the local community, are of great importance. Special plan of these activities has been prepared by the Agency for Radwaste Management in early stage of the project. Initial activities have already been successfully realized. In this paper the communication plan is presented and most important elements of this plan are briefly described. (author)

  7. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  8. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  9. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  10. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  11. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  12. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    International Nuclear Information System (INIS)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    2013-01-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  13. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  14. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  15. Remedial action and waste disposal project: 100-DR-1 remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Calverley, C.

    1996-08-01

    This plan presents the method used to assess the readiness of the 100- DR-1 Remedial Action Project. Remediation of the 100-D sites (located on the Hanford Site) involves the excavation (treatment if applicable) and final disposal of contaminated soil and debris associated with the high-priority waste sites in the 100 Areas

  16. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  17. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    Science.gov (United States)

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  18. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  19. Remedial action and waste disposal project -- 100-DR-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    April, J.G.; Ard, J.A.; Corpuz, F.M.; DeMers, S.K.; Donahoe, R.L.; Frank, J.M.; Hobbs, B.J.; Roeck, F.V.

    1997-02-01

    This readiness assessment report presents the results of the project readiness assessment for the 100-DR-1 source sites remediation. The assessment was conducted at the conclusion of a series of project activities that began in August 1996. These activities included confirming the completion of project-specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, and mobilization and construction of site support systems

  20. Upper Limit for Regional Sea Level Projections

    Science.gov (United States)

    Jevrejeva, Svetlana; Jackson, Luke; Riva, Riccardo; Grinsted, Aslak; Moore, John

    2016-04-01

    With more than 150 million people living within 1 m of high tide future sea level rise is one of the most damaging aspects of warming climate. The latest Intergovernmental Panel on Climate Change report (AR5 IPCC) noted that a 0.5 m rise in mean sea level will result in a dramatic increase the frequency of high water extremes - by an order of magnitude, or more in some regions. Thus the flood threat to the rapidly growing urban populations and associated infrastructure in coastal areas are major concerns for society. Hence, impact assessment, risk management, adaptation strategy and long-term decision making in coastal areas depend on projections of mean sea level and crucially its low probability, high impact, upper range. With probabilistic approach we produce regional sea level projections taking into account large uncertainties associated with Greenland and Antarctica ice sheets contribution. We calculate the upper limit (as 95%) for regional sea level projections by 2100 with RCP8.5 scenario, suggesting that for the most coastlines upper limit will exceed the global upper limit of 1.8 m.

  1. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  2. Alcan Kitimat smelter modernization project remedial action scheme functional requirements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-09-09

    This paper identified remedial actions for reducing islanding and voltage collapse at the Alcan Kitimat smelter modernization project. The study was conducted after an earlier study indicated that the proposed project significantly increased electricity loads and stresses on Alcan's power system. Remedial actions included shedding the appropriate number of Kemano (KMO) generators; reducing Kitimat potline loads by de-saturating saturable reactors and lowering tap changers; and shedding potlines to preserve the Kitimat auxiliary load and facilitate power restoration. Power flow and transient stability studies were conducted to evaluate the impact of the remedial actions on the KMO generators and the transmission system. Results showed that fast load reduction improved power system response. Load reduction by changing the converter transformer tap reduced significant amounts of loads, but was too slow to be effective during fast voltage collapse. The study showed that although the remedial action scheme (RAS) reduced the impact of various contingencies on the Alcan system, performance was degraded due to the significant load increase. Fast load shedding capability was also reduced. It was concluded that further research is needed to develop and implement the RAS. 3 tabs., 7 figs.

  3. Remedial action and waste disposal project: 100-B/C remedial action readiness report

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-07-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the 100-B/C source sites remediation. The 100-B/C Area is located at the Hanford Site in Richland, Washington. The evaluation was conducted at the conclusion of a series of readiness activities that began in May 1996. These activities included confirming the completion of project specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, approval of subcontractor submittals, and mobilization and construction of site support systems

  4. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  5. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    Carson, J.W.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Remsen, W.E.; Tuttle, B.G.; Wilson, R.C.

    1997-09-01

    This report documents the readiness assessment for initial startup of the 300-FF-1 Remedial Action Task. A readiness assessment verifies and documents that field activities are ready to start (or restart) safely. The 300-FF-1 assessment was initiated in April 1997. Readiness assessment activities included confirming the completion of project-specific procedures and permits, training staff, obtaining support equipment, receipt and approval of subcontractor submittals, and mobilization and construction of site support systems. The scope of the 300-FF-1 Remedial Action Task includes excavation and disposal of contaminated soils at liquid waste disposal facilities and of waste in the 618-4 Burial Ground and the 300-FF-1 landfills. The scope also includes excavation of test pits and test trenches

  6. UMTRA -- The US Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Lightner, R.; Cormier, C.; Bierley, D.

    1995-01-01

    In the late 1970s, the United States (US) established the first comprehensive regulatory structure for the management, disposal, and long-term care of wastes produced from its domestic uranium processing industry. This regulatory framework was established through the passage of the Uranium Mill Tailings Radiation Control Act of 1978, often referred to as UMTRCA. This legislation created the Uranium Mill Tailings Remedial Action (UMTRA) Project and assigned the US Department of Energy (DOE) the lead in conducting the required remedial action at 24 designated inactive uranium ore processing sites. With the majority of these 22 sites complete, the DOE's UMTRA Project has established a distinguished reputation for safely and effectively remediating these low-level waste sites in a complex regulatory and socioeconomic environment. This paper describes the past accomplishments and current status of the UMTRA Project and discusses the DOE's plans for addressing ground water contamination associated with these sites and its commitment to continuing the long-term care and management of these disposal cells

  7. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  8. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  9. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  10. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  11. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    Energy Technology Data Exchange (ETDEWEB)

    Post, Thomas C. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); Strom, Dean [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States); Beulow, Laura [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)

    2013-07-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  12. Communication and Stakeholder Involvement in Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-05-15

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  13. Communication and Stakeholder Involvement in Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2014-01-01

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  14. Programmatic Environmental Report for remedial actions at UMTRA [Uranium Mill Tailings Remedial Action] Project vicinity properties

    International Nuclear Information System (INIS)

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs

  15. Green PCB Remediation from Sediment Systems (GPRSS) Project

    Science.gov (United States)

    Falker, John; Thompson, Karen; Zeitlin, Nancy; Quinn, Jacqueline; Parrish, Lewis M.

    2014-01-01

    An ongoing problem facing the global environment community including NASA centers is the removal and remediation of polychlorinated biphenyls (PCBs). PCBs were commonly used in a variety of materials including paints, caulking, and adhesives due to the advantageous physical and chemical properties that PCBs imparted to these various materials. Unfortunately, these properties have made the treatment of sites contaminated with these chemicals extremely difficult to deal with, due to their inherent chemical stability. The remediation of sediments contaminated with PCBs is especially difficult, primarily due to the risk of releasing the contaminant into the environment during the treatment process. Traditional treatment options involve the use of dredging and incineration of the contaminated soils/sediments, in which the chance of releasing the contaminants is greatly increased. The purpose of this project is to develop cleanup technology capable of remediating contaminated sediments in-situ, with minimum intrusion. This allows for the minimization of any potential contaminant release during the treatment process, providing a safer method for cleanup operations (as opposed to dredging/incineration) and still treating the basic problem of PCB contamination (as opposed to capping).

  16. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  17. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  18. Ad interim legal remedy in case of large projects

    International Nuclear Information System (INIS)

    Limberger, J.

    1985-01-01

    Action for ad interim judicial relief in response to large projects approved of by the authorities very frequently take several years until a decision is taken by the court. Experience has shown that this applies in particular to large projects such as the construction of nuclear power plants, large-size industrial plants, or airports. It has become regular practice by the authorities concerned to issue an order for immediate execution upon the plan approving decision and granting of licence for said projects, in accordance with section 80, sub-section (2), no.4 of the VwGO. The problems thus created with regard to interim legal remedy sought by the parties concerned are of great significance. The book in hand discusses the question as to whether the practice of the administrative authorities and the courts satisfies the requirements embodied in the law, to provide for efficient legal protection. (orig./HSCH) [de

  19. Overcoming Barriers in the Implementation of Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-06-15

    characterization techniques and strategies; assessment of remediation technologies; techniques and strategies for post-remediation compliance monitoring; special issues such as the remediation of sites with dispersed radioactive contamination or mixed contamination by hazardous and radioactive substances, as well as monitored natural attenuation; and long term management issues at sites with residual contamination. It was noted that, although the understanding of the need to address radiological liabilities had gained considerable momentum since the end of the Cold War, in many Member States actual remediation programmes have made little progress beyond the assessment and perhaps the planning phase. This publication analyses the various drivers for remediation projects, possible obstacles and potential solutions to overcome those obstacles. It is noted that care must be taken when establishing measures that are intended to foster increased protection, for example a very prescriptive regulatory framework, as such measures may turn out to be counterproductive. The main obstacle in most cases is a lack of funding. A number of creative ways to structure projects and to identify sources of funds are discussed in this book.

  20. Overcoming Barriers in the Implementation of Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2013-01-01

    characterization techniques and strategies; assessment of remediation technologies; techniques and strategies for post-remediation compliance monitoring; special issues such as the remediation of sites with dispersed radioactive contamination or mixed contamination by hazardous and radioactive substances, as well as monitored natural attenuation; and long term management issues at sites with residual contamination. It was noted that, although the understanding of the need to address radiological liabilities had gained considerable momentum since the end of the Cold War, in many Member States actual remediation programmes have made little progress beyond the assessment and perhaps the planning phase. This publication analyses the various drivers for remediation projects, possible obstacles and potential solutions to overcome those obstacles. It is noted that care must be taken when establishing measures that are intended to foster increased protection, for example a very prescriptive regulatory framework, as such measures may turn out to be counterproductive. The main obstacle in most cases is a lack of funding. A number of creative ways to structure projects and to identify sources of funds are discussed in this book.

  1. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  2. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA

  3. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  4. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  5. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  6. Uranium Mill Tailings Remedial Action Project Vicinity Property Program

    International Nuclear Information System (INIS)

    Little, L.E.; Potter, R.F.; Arpke, P.W.

    1988-01-01

    The Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Grand Junction Project Vicinity Property Program is a $165 million program for the removal and disposal of uranium mill tailings that were used in the construction of approximately 4,000 residences, commercial buildings, and institutional facilities in the City of Grand Junction and surrounding Mesa County, Colorado. This paper discusses the UMTRA Vicinity Property Program and the economic benefits of this program for the City of Grand Junction and Mesa County, Colorado. The Bureau of Reclamation Economic Assessment Model (BREAM) was used to estimate the increases in employment and increases in personal income in Mesa County that result from the Vicinity Property Program. The effects of program-related changes in income and taxable expenditures on local and state tax revenue are also presented

  7. Uniroyal Chemical`s remediation project meets or exceeds expectations

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1997-11-01

    Recent remedial actions taken by Uniroyal Chemical Ltd at their Elmira, Ontario, plant have been considered. The company has been manufacturing a wide range of organic chemicals at this plant for use in agriculture and in the plastics and rubber industries since 1942. Historically, wastes were disposed of on-site, which while common practice at the time, caused soil and water contamination by N-nitrosodimethylamine (NDMA), volatile organic compounds such as benzene, toluene, and chlorobenzene, aniline, mercaptobenzothiazole and basic compounds such as ammonia. The local hydrogeology is fairly complex and consists of several aquifers and aquitards of which the Upper Aquifer (UA) and the Municipal Aquifer (MA) have been the primary concern. They have supplied all or part of the drinking water for the Kitchener-Waterloo area and the town of Elmira. After an extensive feasibility study, the decision was made to install shallow extension wells, and a system to treat the groundwater to acceptable criteria to discharge the treated water to the river system. Development of the system, which besides ten extraction wells includes a tertiary treatment process for UV oxidation, was described. The system has been in operation since January 1997. It affords 95 to 98 per cent of containment efficiency, 99 per cent ammonia removal, and 99.97 per cent of NDMA removal. Effluent requirements have been consistently met for all 18 primary contaminants, and no groundwater is being discharged into the river system.

  8. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  9. Sustainable geoengineering projects for the remediation of mine site

    Science.gov (United States)

    Martínez-Sanchez, Maria Jose; Perez-Sirvent, Carmen; Garcia-Lorenzo, Maria Luz; Martinez-Lopez, Salvadora; Gonzalez, Eva; Perez-Espinosa, Victor; Molina-Ruiz, Jose; Belen Martinez, Lucia; Hernandez, Carmen; Bech, Jaime; Hernandez-Cordoba, Manuel

    2015-04-01

    A large number of soils are contaminated by heavy metals due to mining activities, generating adverse effects on human health and the environment. In response to these negative effects, a variety of technologies have been developed. In situ immobilization by means of soil amendment is a non-intrusive and cost effective alternative that transforms the highly mobile toxic heavy metals to physico-chemically stable forms. Limestone filler is a good selection for such a purpose, because of its characteristics. In addition, the use of this amendment could revalorize the residues, reducing the costs of the process. The objective of this work was to evaluate the effectiveness of an immobilization technique in sediments contaminated by heavy metals. Two experimental areas, approximately 1 Ha each one, were selected, and technosols were developed as follows: original sediments, sediments mixed with limestone filler in a 1:1 proportion, gravel to avoid capillary and natural soil to allow plant growth. After the remediation technique was applied, monitoring was done in 18 points collecting samples (sediment and water) during a 4 years period at two month intervals. The pH and electrical conductivity as well as the heavy metal (Zn, Pb, Cd, Cu and As) contents were measured. Microtox bioassay was also applied. Sediments before the remediation technique showed acidic pH, high EC values and high trace elements content. The results obtained after the immobilization showed that sediment samples had neutral pH (average value of 8.3) low electrical conductivity (1.32 dS m-1) and low trace elements concentration. It can be concluded that the use of limestone filler is an excellent option in sediments polluted because of the risk for human health or ecosystem disappears or is decreased in a large extent. In addition, the designed experience allows stabilizer proportion to be optimized and may suppose a big cost-saving in the project in areas affected by mining activities.

  10. The upper Rhine waste heat project

    International Nuclear Information System (INIS)

    Schikarski, W.

    1977-03-01

    The tasks and targets of the project are: 1) Determination of the parameters relevant for an assessment of consequences, e.g.: General influences on weather and climate, anthropogenic influences on weather and climate, effects, affected systems, boundary conditions, anthropogenic changes in boundary conditions. 2) Developing a method of evaluation. 3) Establishing a sensitivity model and carrying out analyses. 4) Determining interface parameters which relate this project to other projects. 5) Summary of the findings and preparation of the main study. The cooperating institutions are: UBA, GfK, KFA, Deutscher Wetterdienst, University Bonn (Inst. f. Meteorology), Bonnenberg + Drescher GmbH, ISI (FhG Karlsruhe). (orig./HP) [de

  11. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  12. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  13. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  14. Remediation activities at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Walsh, T.J.; Danner, R.

    1996-01-01

    The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began manufacturing uranium products in the early 1950's and continued processing uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to produce uranium metals for use at other DOE sites across the country. Since the facility manufactured uranium metals for over thirty years, various amounts of radiological contamination exists at the site. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were also generated at the site. In 1989. the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility's radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper discusses the proposed remediation activities at the five Operable Units (OUs) designated at the FEMP. In addition, the paper also examines the ongoing CERCLA response actions and RCRA closure activities at the facility

  15. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    International Nuclear Information System (INIS)

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  16. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  17. Remediation Approach for the Integrated Facility Disposition Project at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kirk, P.G.; Stephens, Jr.J.M.

    2009-01-01

    The Integrated Facility Disposition Project (IFDP) is a multi-billion-dollar remediation effort being conducted by the U.S. Department of Energy (DOE) Office of Environmental Management in Oak Ridge, Tennessee. The scope of the IFDP encompasses remedial actions related to activities conducted over the past 65 years at the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12). Environmental media and facilities became contaminated as a result of operations, leaks, spills, and past waste disposal practices. ORNL's mission includes energy, environmental, nuclear security, computational, and materials research and development. Remediation activities will be implemented at ORNL as part of IFDP scope to meet remedial action objectives established in existing and future decision documents. Remedial actions are necessary (1) to comply with environmental regulations to reduce human health and environmental risk and (2) to release strategic real estate needed for modernization initiatives at ORNL. The scope of remedial actions includes characterization, waste management, transportation and disposal, stream restoration, and final remediation of contaminated soils, sediments, and groundwater. Activities include removal of at or below-grade substructures such as slabs, underground utilities, underground piping, tanks, basins, pits, ducts, equipment housings, manholes, and concrete-poured structures associated with equipment housings and basement walls/floors/columns. Many interim remedial actions involving groundwater and surface water that have not been completed are included in the IFDP remedial action scope. The challenges presented by the remediation of Bethel Valley at ORNL are formidable. The proposed approach to remediation endeavors to use the best available technologies and technical approaches from EPA and other federal agencies and lessons learned from previous cleanup efforts. The objective is to minimize cost, maximize remedial

  18. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  19. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  20. ISS Internal Active Thermal Control System (IATCS) Coolant Remediation Project

    Science.gov (United States)

    Morrison, Russell H.; Holt, Mike

    2005-01-01

    The IATCS coolant has experienced a number of anomalies in the time since the US Lab was first activated on Flight 5A in February 2001. These have included: 1) a decrease in coolant pH, 2) increases in inorganic carbon, 3) a reduction in phosphate buffer concentration, 4) an increase in dissolved nickel and precipitation of nickel salts, and 5) increases in microbial concentration. These anomalies represent some risk to the system, have been implicated in some hardware failures and are suspect in others. The ISS program has conducted extensive investigations of the causes and effects of these anomalies and has developed a comprehensive program to remediate the coolant chemistry of the on-orbit system as well as provide a robust and compatible coolant solution for the hardware yet to be delivered. The remediation steps include changes in the coolant chemistry specification, development of a suite of new antimicrobial additives, and development of devices for the removal of nickel and phosphate ions from the coolant. This paper presents an overview of the anomalies, their known and suspected system effects, their causes, and the actions being taken to remediate the coolant.

  1. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    International Nuclear Information System (INIS)

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification

  2. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  3. Remediation of Gremikha Coastal maintenance base - status of the project

    International Nuclear Information System (INIS)

    Pillette-Cousin, L.; Stepennov, B.S.; Gorbatchev, A.

    2008-01-01

    The former coastal maintenance base in Gremikha is located in the Kola Peninsula, along the Barents Sea, about 300 km east from Murmansk. There is no road or railway to get there, therefore the only possible connection is either by sea or by helicopter. Remediation of the Gremikha coastal maintenance base (CMB) is now one of the main priorities for Rosatom (the Agency for Atomic Energy of the Russian Federation) because nuclear and radioactive waste are currently stored in conditions which do not meet the up-to-date safety and regulatory requirements and it might represent an environmental hazard and a risk of misappropriation of the nuclear material stored there. (authors)

  4. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  5. Tank SY-102 remediation project: Flowsheet and conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Yarbro, S.L.; Punjak, W.A.; Schreiber, S.B.; Dunn, S.L.; Jarvinen, G.D.; Marsh, S.F.; Pope, N.G.; Agnew, S.; Birnbaum, E.R.; Thomas, K.W.; Ortic, E.A.

    1994-01-01

    The US Department of Energy established the Tank Waste Remediation System (TWRS) to safely manage and dispose of radioactive waste stored in underground tanks on the Hanford Site. A major program in TWRS is pretreatment which was established to process the waste prior to disposal. Pretreatment is needed to resolve tank safety issues and to separate wastes into high-level and low-level fractions for subsequent immobilization and disposal. There is a fixed inventory of actinides and fission products in the tank which must be prepared for disposal. By segregating the actinides and fission products from the bulk of the waste, the tank`s contents can be effectively managed. Due to the high public visibility and environmental sensitivity of this problem, real progress and demonstrated efforts toward addressing it must begin as soon as possible. As a part of this program, personnel at the Los Alamos National Laboratory (LANL) have developed and demonstrated a flowsheet to remediate tank SY-102 which is located in the 200 West Area and contains high-level radioactive waste. This report documents the results of the flowsheet demonstrations performed with simulated, but radioactive, wastes using an existing glovebox line at the Los Alamos Plutonium Facility. The tank waste was characterized using both a tank history approach and an exhaustive evaluation of the available core sample analyses. This report also presents a conceptual design complete with a working material flow model, a major equipment list, and cost estimates.

  6. Tank SY-102 remediation project: Flowsheet and conceptual design report

    International Nuclear Information System (INIS)

    Yarbro, S.L.; Punjak, W.A.; Schreiber, S.B.; Dunn, S.L.; Jarvinen, G.D.; Marsh, S.F.; Pope, N.G.; Agnew, S.; Birnbaum, E.R.; Thomas, K.W.; Ortic, E.A.

    1994-01-01

    The US Department of Energy established the Tank Waste Remediation System (TWRS) to safely manage and dispose of radioactive waste stored in underground tanks on the Hanford Site. A major program in TWRS is pretreatment which was established to process the waste prior to disposal. Pretreatment is needed to resolve tank safety issues and to separate wastes into high-level and low-level fractions for subsequent immobilization and disposal. There is a fixed inventory of actinides and fission products in the tank which must be prepared for disposal. By segregating the actinides and fission products from the bulk of the waste, the tank's contents can be effectively managed. Due to the high public visibility and environmental sensitivity of this problem, real progress and demonstrated efforts toward addressing it must begin as soon as possible. As a part of this program, personnel at the Los Alamos National Laboratory (LANL) have developed and demonstrated a flowsheet to remediate tank SY-102 which is located in the 200 West Area and contains high-level radioactive waste. This report documents the results of the flowsheet demonstrations performed with simulated, but radioactive, wastes using an existing glovebox line at the Los Alamos Plutonium Facility. The tank waste was characterized using both a tank history approach and an exhaustive evaluation of the available core sample analyses. This report also presents a conceptual design complete with a working material flow model, a major equipment list, and cost estimates

  7. Public information experience in the uranium mill tailings remedial action (UMTRA) project

    International Nuclear Information System (INIS)

    Meyer, H.R.; Skinner, D.J.

    1986-01-01

    To enhance public perception of the UMTRA Project remedial actions at some 23 sites in the US, an information program has been designed to demonstrate the small risk associated with the work in each community. An unusual aspect of this information program has involved a specific effort to educate listeners concerning the Health Physics terminology being used. The information program has been successful in reducing the level of public anxiety associated with UMTRA remedial action at the first Project site, and is currently being applied at several new sites

  8. Integrated program management for major nuclear decommissioning and environmental remediation projects - 59068

    International Nuclear Information System (INIS)

    Lehew, John

    2012-01-01

    Document available in abstract form only. Full text of publication follows: CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy's (DOE) contractor responsible for the safe, environmental cleanup of the Hanford Sites Central Plateau, sections of the Columbia River Corridor and the Hanford Reach National Monument. The 586-square-mile Hanford Site is located along the Columbia River in southeastern Washington, U.S.A. A plutonium production complex, housing the largest volume of radioactive and contaminated waste in the nation, with nine nuclear reactors and associated processing facilities, Hanford played a pivotal role in the nation's defense for more than 40 years, beginning in the 1940's with the Manhattan Project. Today, under the direction of the DOE, Hanford is engaged in one of the world's largest environmental cleanup project. The Plateau Remediation Contract is a 10-year project paving the way for closure of the Hanford Site. The site through its location, climate, geology and proximity to the Columbia River in combination with the results of past nuclear operations presents a highly complex environmental remediation challenge. The complexity is not only due to the technical issues associated with decommissioning nuclear facilities, remediating soil contamination sites, dispositioning legacy waste and fuel materials and integrating these with the deep vadose zone and groundwater remediation

  9. Uranium mill tailings remedial action project real estate management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy's (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence

  10. Uranium mill tailings remedial action project real estate management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  11. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  12. Safety analysis and hazard classification for the 100-B/C Site Remediation Project, Phase 1. Revision 1

    International Nuclear Information System (INIS)

    Adam, W.J.; Lehrschall, R.R.; Oestreich, D.K.

    1996-07-01

    The purpose of this report is to document the preliminary hazard classification (PHC) for the initial group of sites to be remediated by the 100-B/C Site Remediation Project. The project is targeted at excavation of contaminated solid from seven waste sites, and the transportation and disposal of these wastes at the Environmental Restoration Disposal Facility. The PHC for these remediation activities is rated as radiological

  13. Decontamination Technologies, Task 3, Urban Remediation and Response Project

    International Nuclear Information System (INIS)

    Heiser, J.; Sullivan, T.

    2009-01-01

    In the aftermath of a Radiological Dispersal Device (RDD, also known as a dirty bomb) it will be necessary to remediate the site including building exteriors and interiors, equipment, pavement, vehicles, personal items etc. Remediation will remove or reduce radioactive contamination from the area using a combination of removing and disposing of many assets (including possible demolition of buildings), decontaminating and returning to service other assets, and fixing in place or leaving in place contamination that is deemed 'acceptable'. The later will require setting acceptable dose standards, which will require negotiation with all involved parties and a balance of risk and cost to benefit. To accomplish the first two, disposal or decontamination, a combination of technologies will be deployed that can be loosely classified as: Decontamination; Equipment removal and size reduction; and Demolition. This report will deal only with the decontamination technologies that will be used to return assets to service or to reduce waste disposal. It will not discuss demolition, size reduction or removal technologies or equipment (e.g., backhoe mounted rams, rock splitter, paving breakers and chipping hammers, etc.). As defined by the DOE (1994), decontamination is removal of radiological contamination from the surfaces of facilities and equipment. Expertise in this field comes primarily from the operation and decommissioning of DOE and commercial nuclear facilities as well as a small amount of ongoing research and development closely related to RDD decontamination. Information related to decontamination of fields, buildings, and public spaces resulting from the Goiania and Chernobyl incidents were also reviewed and provide some meaningful insight into decontamination at major urban areas. In order to proceed with decontamination, the item being processed needs to have an intrinsic value that exceeds the cost of the cleaning and justifies the exposure of any workers during the

  14. Decontamination Technologies, Task 3, Urban Remediation and Response Project

    Energy Technology Data Exchange (ETDEWEB)

    Heiser,J.; Sullivan, T.

    2009-06-30

    In the aftermath of a Radiological Dispersal Device (RDD, also known as a dirty bomb) it will be necessary to remediate the site including building exteriors and interiors, equipment, pavement, vehicles, personal items etc. Remediation will remove or reduce radioactive contamination from the area using a combination of removing and disposing of many assets (including possible demolition of buildings), decontaminating and returning to service other assets, and fixing in place or leaving in place contamination that is deemed 'acceptable'. The later will require setting acceptable dose standards, which will require negotiation with all involved parties and a balance of risk and cost to benefit. To accomplish the first two, disposal or decontamination, a combination of technologies will be deployed that can be loosely classified as: Decontamination; Equipment removal and size reduction; and Demolition. This report will deal only with the decontamination technologies that will be used to return assets to service or to reduce waste disposal. It will not discuss demolition, size reduction or removal technologies or equipment (e.g., backhoe mounted rams, rock splitter, paving breakers and chipping hammers, etc.). As defined by the DOE (1994), decontamination is removal of radiological contamination from the surfaces of facilities and equipment. Expertise in this field comes primarily from the operation and decommissioning of DOE and commercial nuclear facilities as well as a small amount of ongoing research and development closely related to RDD decontamination. Information related to decontamination of fields, buildings, and public spaces resulting from the Goiania and Chernobyl incidents were also reviewed and provide some meaningful insight into decontamination at major urban areas. In order to proceed with decontamination, the item being processed needs to have an intrinsic value that exceeds the cost of the cleaning and justifies the exposure of any workers

  15. Ferrier Groundwater Remediation Project: A proactive response to public concerns

    International Nuclear Information System (INIS)

    Boulton, B.D.

    1993-01-01

    The Ferrier gas plant in Alberta is owned by Pembina Resources and produces ca 10 m 3 /d of oil, 8,000 l/d of natural gas liquids, and sales gas. In late 1992, contamination from benzene, toluene, ethylbenzene, and xylene was detected in a residential water well south of the plant. A site investigation found that a drain line from the plant's dehydrator still column to the flare was leaking, and that a well in the process building had free condensate on the water. Within the first three weeks of the initial report of contamination, the source of contamination had been identified, soil gas surveys had been conducted, integrity of pipelines was tested, piezometers were installed, and the first of many public meetings was held to inform residents of progress in tackling the problem. An action plan was developed and alternative water supplies were installed for affected residents. Newsletters were mailed to local residents concerning progress on remediation and plans to control the source and to capture the contamination plume were shared with the community at all times. Recovery wells to capture the plume were drilled and the captured water was treated and returned to the aquifer. Control of the source (the free condensate floating on the water table) was tackled by installing a recovery trench with drain lines. Meetings with the local residents' committee will continue to maintain trust with the community

  16. Soil Remediation Demonstration Project: Biodegradation of Heavy Fuel Oils

    National Research Council Canada - National Science Library

    Reynolds, Charles

    1997-01-01

    .... Low-cost treatments applicable to small-scale spills are needed. The object of this CPAR project was to examine using cost-effective, on-site bioremediation techniques for heavy-oil-contaminated soil in cold regions...

  17. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  18. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  19. DECHEM: A remedial planning tool for metallic contaminants in soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The DECHEM (DEcontamination of CHEMicals) method was developed for the Uranium Mill Tailings Remedial Action (UMTRA) Project to guide characterization and remedial planning for metals contamination in soils. This is necessary because non-radiological hazardous constituents may be more mobile than radium-226 (Ra-226), and hence may migrate more deeply into subpile soils (beneath tailings that are to be relocated) or into adjacent contaminated soils at UMTRA Project sites. The result is that remedial action to the Ra-226 excavation limit, as specified in the US Environmental Protection Agency (EPA) standards, may not adequately remove hazardous non-radiological contamination. Unmitigated, these contaminants in soil may cause health risks because of their presence in resuspended particles, their uptake by crops or fodder their seepage into aquifers used for drinking water or other possible exposure pathways. The DECHEM method was developed in response to the need for advanced planning for the remediation of chemical contaminants at UMTRA Project sites, and includes the following elements: Establishment of acceptable exposure rates for humans to chemicals, based on EPA guidelines or other toxicological literature. Modeling of chemical migration through environmental pathways from a remediated UMTRA Project site to humans. Determination of allowable residual concentrations (i.e., cleanup guidelines) for chemicals in soils that results in doses to humans that are below established acceptable exposure rates. The initial development and application of the DECHEM method has focused upon hazardous metallic contaminants such as arsenic, lead, molybdenum, and selenium, which are known to occur in elevated concentrations at some UMTRA Project sites

  20. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1992-01-01

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document

  1. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL & REGULATORY COLLABORATION

    Energy Technology Data Exchange (ETDEWEB)

    JARAYSI, M.N.

    2007-01-08

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure.

  2. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  3. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL and REGULATORY COLLABORATION

    International Nuclear Information System (INIS)

    JARAYSI, M.N.

    2007-01-01

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure

  4. Tank waste remediation system characterization project quality policies

    International Nuclear Information System (INIS)

    Board, D.C.

    1997-01-01

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer's quality requirements known as the 'RULE', 10 CFR 830.120, Quality Assurance

  5. Approved CAMU equals faster, better, cheaper remediation at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Dupuis-Nouille, E.M.; Goidell, L.C.; Strimbu, M.J.; Nickel, K.A.

    1996-01-01

    A 1,050 acre Corrective Action Management Unit (CAMU) was approved for the Fernald Protection Agency Environmental Management Project (FEMP) by the US Environmental Protection Agency (USEPA) to manage environmental media remediation waste in the Operable Unit 5 Record of Decision, 1995. Debris is also proposed for management as remediation waste under the CAMU Rule in the Operable Unit 3 Remedial Investigation/Feasibility Study (RI/FS) Report, as of December 1995. Application of the CAMU Rule at the FEMP will allow consolidation of low-level mixed waste and hazardous waste that presents minimal threat from these two operable units in an on-property engineered disposal facility without triggering land disposal restrictions (LDRs). The waste acceptance criteria for the on property disposal facility are based on a combination of site-specific risk-based concentration standards, as opposed to non-site-specific requirements imposed by regulatory classifications

  6. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  7. Analysis of expert opinion on uranium mill tailings remedial action project (UMTRAP) alternatives: a decision-support-system pilot study

    International Nuclear Information System (INIS)

    Thode, E.F.

    1983-01-01

    The Uranium Mill Tailings Remedial Action Project requires a specific remedial action individually chosen for each site. A panel of professionals was asked to rate objectives for remedial action and to rank alternatives for meeting the objectives. Responses were statistically analyzed. The panel's preference was earth cover in place at the Salt Lake City, Utah, and Shiprock, New Mexico, sites. Asphalt cover was next at Salt Lake City. This decision support system is appropriate for use with other inactive and active tailings sites

  8. Status and outlook for the WISMUT Remediation Project in the States of Thuringia and Saxony, Germany

    International Nuclear Information System (INIS)

    Hagen, M.; Gatzweiler, R.; Jakubick, A.T.

    2002-01-01

    The ongoing WISMUT Remediation Program deals with the legacy of more than 40 years of largescale uranium mining and processing in the densely populated areas of Eastern Thuringia and Saxony (Germany). The mining and processing operations (total uranium production more than 220,000 tonnes) comprise an area of approx. 37 km 2 . WISMUT started with a complex site investigation program to determine the degree of contamination of affected areas and an extended environmental monitoring system of the pathways was established. The overall approach follows the general rule of guiding, planning and implementation of the site specific rehabilitation projects to ensure an optimal balance between rehabilitation costs and environmental benefits while complying with the applicable laws and requirements of the permitting agencies. The WISMUT approach to remediation can be viewed as an adaptable process tailored to specific circumstances and site specific situations taking public interests into account. Remediation solutions will be demonstrated by various site specific examples. The WISMUT decommissioning and rehabilitation project is now in its eleventh year and by middle of the year 2000 approximately half of the cleanup has been finished. A well thought out approach to water treatment and timely adjustment to changing conditions will help save water treatment costs. Consideration of the post rehabilitation use and surveillance requirements are an integral part of the optimisation of the remedial measures. (author)

  9. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  10. Modern Sorters for Soil Segregation on Large Scale Remediation Projects

    International Nuclear Information System (INIS)

    Shonka, J.J.; Kelley, J.E.; O'Brien, J.M.

    2008-01-01

    volume is 50 kilograms or less. Smaller sorting volumes can be obtained with lower throughput or by re-sorting the diverted material. This equipment can also handle large objects. The use of spectroscopy systems allows several regions of- interest to be set. Super-Sorters can bring waste processing charges down to less than $30/ metric ton on smaller jobs and can save hundreds of dollars per metric ton in disposal charges. The largest effect on the overall project cost occurs during planning and implementation. The overall goal is reduction of the length of the project, which dictates the most efficient soil processing. With all sorting systems the parameters that need to be accounted for are matrix type, soil feed rate, soil pre-processing, site conditions, and regulatory issues. The soil matrix and its ability to flow are extremely crucial to operations. It is also important to consider that as conditions change (i.e., moisture), the flowability of the soil matrix will change. Many soil parameters have to be considered: cohesive strength, internal and wall friction, permeability, and bulk density as a function of consolidating pressure. Clay bearing soils have very low permeability and high cohesive strength which makes them difficult to process, especially when wet. Soil feed speed is dependent on the equipment present and the ability to move the soil in the Super-Sorter processing area. When a Super-Sorter is running at 400 metric tons per hour it is difficult to feed the system. As an example, front-end loaders with large buckets would move approximately 5-10 metric tons of material, and 400 metric tons per hour would require 50-100 bucket-loads per hour to attain. Because the flowability of the soil matrix is important, poor material is often pre-processed before it is added to the feed hopper of the 'survey' conveyor. This pre-processing can consist of a 'grizzly' to remove large objects from the soil matrix, followed screening plant to prepare the soil so that it

  11. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  12. Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project will upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included

  13. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  14. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-01-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded

  15. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project

    International Nuclear Information System (INIS)

    1993-01-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date

  16. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  17. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs

  18. Consensus implementation of a groundwater remediation project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Hastings, K.R.; Carlson, D.S.

    1996-01-01

    Because of significant characterization uncertainties existing when the Record of Decision was signed and the unfavorable national reputation of groundwater pump and treat remediation projects, the Test Area North (TAN) groundwater ROD includes the evaluation of five emerging technologies that show potential for treating the organic contamination in situ or reducing the toxicity of contaminants above ground. Treatability studies will be conducted to ascertain whether any may be suitable for implementation at TAN to yield more timely or cost effective restoration of the aquifer. The implementation approach established for the TAN groundwater project is a consensus approach, maximizing a partnership relation with stakeholders in constant, iterative implementation decision making

  19. Case study of shallow soil mixing and soil vacuum extraction remediation project

    International Nuclear Information System (INIS)

    Carey, M.J.; Day, S.R.; Pinewski, R.; Schroder, D.

    1995-01-01

    Shallow Soil Mixing (SSM) and Soil Vacuum Extraction (SVE) are techniques which have been increasingly relied on for the insitu remediation of contaminated soils. The primary applications of SSM have been to mix cement, bentonite, or other reagents to modify properties and thereby remediate contaminated soils or sludges. Soil vacuum extraction has been used at numerous applications for insitu removal of contaminants from soils. At a recent project in southern Ohio, the two technologies were integrated and enhanced to extract volatile organic compounds (VOCs) from soils at a Department of Energy facility. Advantages of the integrated SSM/SVE technology over alternative technologies include a relatively rapid remediation compared to other in-situ techniques at a lower cost, less exposure of waste to the surface environment and elimination of off-site disposal. These advantages led to the selection of the use of both technologies on the project in Southern Ohio. The information presented in this paper is intended to provide Engineers and owners with the level of understanding necessary to apply soil mixing and vacuum extraction technology to a specific site. The most important steps in implementing the technology are site investigation, feasibility estimate, selection of performance criteria, selection of appropriate materials, bench scale testing and construction

  20. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  1. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant

  2. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) is responsible for performing remedial action to bring surface and ground water contaminant levels at 24 inactive uranium processing sites into compliance with the US Environmental Protection Agency (EPA) standards. DOE is accomplishing this through the Uranium Mill Tailings Remedial Action (UMTRA) Surface and Ground Water Projects. Remedial action will be conducted with the concurrence of the US Nuclear Regulatory Commission (NRC) and the full participation of affected states and Indian tribes. Uranium processing activities at most of 24 the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as uranium and nitrate. The purpose of the UMTRA Ground Water Project is to eliminate, or reduce to acceptable levels, the potential health and the environmental consequences of milling activities by meeting the EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance strategies. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently

  3. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    Energy Technology Data Exchange (ETDEWEB)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  4. Simulant composition for the Mixed Waste Management Facility (MWMF) groundwater remediation project

    International Nuclear Information System (INIS)

    Siler, J.L.

    1992-01-01

    A project has been initiated at the request of ER to study and remediate the groundwater contamination at the Mixed Waste Management Facility (MWMF). This water contains a wide variety of both inorganics (e.g., sodium) and organics (e.g., benzene, trichloroethylene). Most compounds are present in the ppB range, and certain components (e.g., trichloroethylene, silver) are present at concentrations that exceed the primary drinking water standards (PDWS). These compounds must be reduced to acceptable levels as per RCRA and CERCLA orders. This report gives a listing of the important constituents which are to be included in a simulant to model the MWMF aquifer. This simulant will be used to evaluate the feasibility of various state of the art separation/destruction processes for remediating the aquifer

  5. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    International Nuclear Information System (INIS)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal

  6. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  7. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    International Nuclear Information System (INIS)

    1997-01-01

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project

  8. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1996-01-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project

  9. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    International Nuclear Information System (INIS)

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized

  10. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  11. Report on game species of concern associated with the Gunnison Remedial Action Project, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1991-09-01

    This report provides background information and data used in the analysis of potential impacts to game species reported in the Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. That environmental assessment provides details regarding proposed remedial action at the Gunnison site along with a description of existing conditions and projected environmental impacts. A summary of the proposed action is provided. The uranium mill tailings and other contaminated materials at the Gunnison processing site would be transported to the Landfill disposal site via the Tenderfoot Mountain (TM) haul route. The remedial action would take place over a three-year period with two six-month winter shutdowns. The first year would consist of site preparation and haul road construction. The second year would consist of moving the tailings. Movement of the radon/infiltration barrier cover material and erosion protection material would take place during the third construction year. The material used to cover the pile is fine-grained material for the radon/infiltration barrier (Sixmile Lane borrow site) and rock for erosion protection from the Chance Gulch borrow site. The location of the borrow sites used to obtain these materials and the associated haul roads is shown

  12. Cost-benefit analysis of copper recovery in remediation projects: A case study from Sweden.

    Science.gov (United States)

    Volchko, Yevheniya; Norrman, Jenny; Rosén, Lars; Karlfeldt Fedje, Karin

    2017-12-15

    Contamination resulting from past industrial activity is a problem throughout the world and many sites are severely contaminated by metals. Advances in research in recent years have resulted in the development of technologies for recovering metal from metal-rich materials within the framework of remediation projects. Using cost-benefit analysis (CBA), and explicitly taking uncertainties into account, this paper evaluates the potential social profitability of copper recovery as part of four remediation alternatives at a Swedish site. One alternative involves delivery of copper-rich ash to a metal production company for refining. The other three alternatives involve metal leaching from materials and sale of the resulting metal sludge for its further processing at a metal production company using metallurgical methods. All the alternatives are evaluated relative to the conventional excavation and disposal method. Metal recovery from the ash, metal sludge sale, and disposal of the contaminated soil and the ash residue at the local landfill site, was found to be the best remediation alternative. However, given the present conditions, its economic potential is low relative to the conventional excavation and disposal method but higher than direct disposal of the copper-rich ash for refining. Volatile copper prices, the high cost of processing equipment, the highly uncertain cost of the metal leaching and washing process, coupled with the substantial project risks, contribute most to the uncertainties in the CBA results for the alternatives involving metal leaching prior to refining. However, investment in processing equipment within the framework of a long-term investment project, production of safe, reusable soil residue, and higher copper prices on the metal market, can make metal recovery technology socially profitable. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. Radiological survey activities: uranium mill tailings remedial action project procedures manual

    International Nuclear Information System (INIS)

    Little, C.A.; Berven, B.A.; Carter, T.E.

    1986-07-01

    The US Department of Energy (DOE) was assigned the responsibility for conducting remedial action at 24 sites, which are located in one eastern and nine western states. The DOE's responsibilities are being met through its Uranium Mill Tailings Remedial Action Project Office (UMTRA-PO) in Albuquerque, New Mexico. The purpose of this Procedures Manual is to provide a standardized set of procedures that document in an auditable manner the activities performed by the Radiological Survey Activities (RASA) group in the Dosimetry and Biophysical Transport Section (DABTS) of the Health and Safety Research Division (HASRD) at the Oak Ridge National Laboratory (ORNL), in its role as the Inclusion Survey Contractor (ISC). Members of the RASA group assigned to the UMTRA Project are headquartered in the ORNL/RASA office in Grand Junction, Colorado, and report to the ORNL/RASA Project Manager. The Procedures Manual ensures that the organizational, administrative, and technical activities of the RASA/UMTRA group conform properly to those of the ISC as described in the Vicinity Properties Management and Implementation Manual and the Summary Protocol. This manual also ensures that the techniques and procedures used by the RASA/UMTRA group and contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards

  14. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  15. Chernobyl 30 years on. Key remediation and safety projects are 'on track'

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, David [NucNet, Brussels (Belgium)

    2016-06-15

    Thirty years after the accident at Chernobyl, key remediation and safety projects are on track and construction of the vital Euro 1.5 bn (US Dollars 1.6 bn) New Safe Confinement (NSC) is almost finished with commissioning scheduled for November 2017, the company in charge of construction and the European Bank for Reconstruction and Development (EBRD) told NucNet. The NSC is the most high profile and expensive element of the US Dollars 2.15 bn Shelter Implementation Plan (SIP), a framework developed to overcome the consequences of the accident.

  16. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach to waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E) Vendor List

  17. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  18. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed {approx}5.5 years ahead of schedule and {approx}$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team.

  19. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    International Nuclear Information System (INIS)

    Lewis, BE

    2003-01-01

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and ∼420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed ∼5.5 years ahead of schedule and ∼$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team

  20. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    International Nuclear Information System (INIS)

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized

  1. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    International Nuclear Information System (INIS)

    Kostova, M.; Howard, D.; Elder, P.

    2013-01-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  2. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    Energy Technology Data Exchange (ETDEWEB)

    Kostova, M.; Howard, D.; Elder, P. [Directorate of Nuclear Cycle and Facilities Regulation, Canadian Nuclear Safety Commission, 280, Slater Street, Ottawa, Ontario K1P 5S9 (Canada)

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  3. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 2

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities. One of the first steps in the UMTRA Ground Water Project is the preparation of the Programmatic Environmental Impact Statement (PEIS). This report contains the comments and responses received on the draft PEIS

  4. Quarry geotechnical report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-11-01

    This report has been prepared for the United States Department of Energy's (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which is MK-Ferguson Company (MK-Ferguson) with Jacobs Engineering Group (JEG) as its designated subcontractor. The Weldon Spring site (WSS) comprises the Weldon Spring quarry area and the Weldon Spring chemical plant and raffinate pit areas. This report presents the results of geotechnical investigations conducted during 1989--1990 at the proposed Weldon Spring quarry staging and water treatment facilities in the quarry area. The facilities are intended for treatment of water removed from the quarry area. An access road and a decontamination pad will be necessary for handling and transportation of bulk waste. Results of previous geotechnical investigations performed by other geoscience and environmental engineering firms in the quarry area, were reviewed, summarized and incorporated into this report. Well logging, stratigraphy data, piezometer data, elevations, and soil characteristics are also included

  5. Determination of aerosol size distributions at uranium mill tailings remedial action project sites

    International Nuclear Information System (INIS)

    Newton, G.J.; Reif, R.H.; Hoover, M.D.

    1994-01-01

    The U.S. Department of Energy (DOE) has an ongoing program, the Uranium Mill Tailings Remedial Action (UMTRA) Project, to stabilize piles of uranium mill tailings in order to reduce the potential radiological hazards to the public. Protection of workers and the general public against airborne radioactivity during remedial action is a top priority at the UMTRA Project. The primary occupational radionuclides of concern are 230 Th, 226 Ra, 210 Pb, 210 Po, and the short-lived decay products of 222 Rn with 230 Th causing the majority of the committed effective dose equivalent (CEDE) from inhaling uranium mill tailings. Prior to this study, a default particle size of 1.0 μm activity median aerodynamic diameter (AMAD) was assumed for airborne radioactive tailings dust. Because of recent changes in DOE requirements, all DOE operations are now required to use the CEDE methodology, instead of the annual effective dose equivalent (AEDE) methodology, to evaluate internal radiation exposures. Under the transition from AEDE to CEDE, with a 1.0 μm AMAD particle size, lower bioassay action levels would be required for the UMTRA Project. This translates into an expanded internal dosimetry program where significantly more bioassay monitoring would be required at the UMTRA Project sites. However, for situations where the particle size distribution is known to differ significantly from 1.0 μm AMAD, the DOE allows for corrections to be made to both the estimated dose to workers and the derived air concentration (DAC) values. For particle sizes larger than 1.0 μm AMAD, the calculated CEDE from inhaling tailings would be relatively lower

  6. Critical management issues for the Uranium Mill Tailings Remedial Action (UMTRA) Project

    International Nuclear Information System (INIS)

    Themelis, J.G.; Krishnan, K.R.

    1985-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (PL95-604) authorized the Secretary of Energy to enter into cooperative agreements with certain states and Indian Tribes to clean up 24 inactive uranium mill tailing sites and associated vicinity properties. The Uranium Mill Tailings Remedial Action (UMTRA) Project includes the three Federal agencies (EPA, DOE, and NRC), eleven state, Indian Tribes, and at least four major contractors. The UMTRA Project extends over a period of ten years. The standards for the Project require a design life of 1000 years with a minimum performance period of 200 years. This paper discusses the critical management issues in dealing with the UMTRA Project and identifies the development of solutions for many of those issues. The highlights to date are promulgation of EPA standards, continued support from Congress and participating states and Indian Tribes, significant leadership shown at all levels, establishment of credibility with the public, and continued motivation of the team. The challenge for tomorrow is making certain NRC will license the sites and maintaining the high level of coordination exhibited to date to assure Project completion on schedule

  7. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  8. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  9. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  10. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    International Nuclear Information System (INIS)

    SPENCER, S.G.

    1999-01-01

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates

  11. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  12. 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE). Screening-Level Feasibility Assessment and Design Tool in Support of 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) ESTCP Project ER 201326

    Science.gov (United States)

    2017-10-01

    USER GUIDE 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) Screening-Level Feasibility Assessment and Design Tool in...Support of 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) ESTCP Project ER-201326 OCTOBER 2017 Rob Hinchee Integrated Science...Technology, Inc. 1509 Coastal Highway Panacea, FL 32346 8/8/2013 - 8/8/2018 10-2017 1,4-Dioxane Remediation by Extreme Soil Vapor Extraction (XSVE) Screening

  13. Evaluation of surface water treatment and discharge options for the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    Goyette, M.L.; MacDonell, M.M.

    1992-01-01

    The US Department of Energy (DOE), under its Environmental Restoration and Waste Management Program, is responsible for conducting response actions at the Weldon Spring site in St. Charles County, Missouri. The site consists of two noncontiguous areas: (1) the chemical plant area, which includes four raffinate pits and two small ponds, and (2) a 3.6-ha (9-acre) quarry located about 6.4 km (4 mi) southwest of the chemical plant area. Both of these areas became chemically and radioactively contaminated as a result of processing and disposal activities that took place from the 1940s through 1960s. The Weldon Spring site, located about 48 km (30 mi) west of St. Louis, is listed on the National Priorities List of the US Environmental Protection Agency. Nitroaromatic explosives were processed by the Army at the chemical plant area during the 1940s, and radioactive materials were processed by DOE's predecessor agency (the Atomic Energy Commission) during the 1950s and 1960s. Overall remediation of the Weldon Spring site is being addressed through the Weldon Spring Site Remedial Action Project, and it consists of several components. One component is the management of radioactively and chemically contaminated surface water impoundments at the chemical plant area -- i.e., the four raffinate pits, Frog Pond, and Ash Pond which was addressed under a separate action and documented in an engineering evaluation/cost analysis report. This report discusses the evaluation of surface water treatment at the Weldon Spring site

  14. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  15. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  16. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  17. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  18. Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1993-09-01

    Public concern regarding the potential human health and environmental effects from uranium mill tailings led Congress to pass the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Public Law 95-604) in 1978. In the UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings at 24 abandoned uranium mill processing sites needing remedial action. Uranium processing activities at most of the 24 mill processing sites resulted in the formation of contaminated ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of hazardous constituents such as uranium and nitrate. The purpose of the Ground Water Project is to protect human health and the environment by meeting EPA-proposed standards in areas where ground water has been contaminated with constituents from UMTRA Project sites. A major first step in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). This document analyzes potential impacts of the alternatives, including the proposed action. These alternatives are programmatic in that they are plans for conducting the UMTRA Ground Water Project. The alternatives do not address site-specific ground water compliance. This PEIS is a planning document that will provide a framework for conducting the Ground Water Project; assess the potential programmatic and environmental impacts of conducting the UMTRA Ground Water Project; provide a method for determining the site-specific ground water compliance strategies; and provide data and information that can be used to prepare site-specific environmental impacts analyses documents more efficiently

  19. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training

  20. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

  1. SAFETY IMPROVES DRAMATICALLY IN FLUOR HANFORD SOIL AND GROUNDWATER REMEDIATION PROJECT

    International Nuclear Information System (INIS)

    GERBER MS

    2007-01-01

    This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walkdowns, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site

  2. SAFETY IMPROVES DRAMATICALLY IN FLUOR HANFORD SOIL AND GROUNDWATER REMEDIATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    GERBER MS

    2007-12-05

    This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walkdowns, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site.

  3. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  4. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  5. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  6. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  7. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    International Nuclear Information System (INIS)

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state's 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs

  8. DOE responses to Ecology review comments for ''Sampling and analysis plans for the 100-D Ponds voluntary remediation project''

    International Nuclear Information System (INIS)

    1996-01-01

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''

  9. Investigation of the Use of "Cucumis Sativus" for Remediation of Chromium from Contaminated Environmental Matrices: An Interdisciplinary Instrumental Analysis Project

    Science.gov (United States)

    Butler, Lynsey R.; Edwards, Michael R.; Farmer, Russell; Greenly, Kathryn J.; Hensler, Sherri; Jenkins, Scott E.; Joyce, J. Michael; Mann, Jason A.; Prentice, Boone M.; Puckette, Andrew E.; Shuford, Christopher M.; Porter, Sarah E. G.; Rhoten, Melissa C.

    2009-01-01

    An interdisciplinary, semester-long project is presented in which students grow Cucumis sativus (cucumber) plants from seeds and study the ability of the plants to remediate a heavy metal from contaminated soil or water or both. Phytoremediation strategies for environmental cleanup are presented as possible alternatives to chemical based clean-up…

  10. Project chariot remediation - the use of DOE's observational approach for environmental restoration with elements of the new DOE safer approach

    International Nuclear Information System (INIS)

    Hopkins, A.; Stewart, C.; Cabble, K.

    1994-01-01

    The primary purpose of Project Chariot was to investigate the technical problems and assess the effect of the proposed harbor excavation using nuclear explosives in Alaska. However, no nuclear devices were brought to the Project Chariot site. Between 1959 and 1961 various environmental tests were conducted. During the course of these environmental studies, the U.S. Geological Survey (USGS) granted the use of up to 5 curies of radioactive material at the Chariot site in Cape Thompson, Alaska; however only 26 millicuries were ever actually used. The tests were conducted in 12 test plots which were later gathered together and were mixed with in situ-soils generating approximately 1,600 cubic feet of soil. This area was then covered with four feet of clean soil, creating a mound. In 1962, the site was abandoned. A researcher at the University of Alaska at Fairbanks obtained in formation regarding the tests conducted and the materials left at the Project Chariot site. In response to concerns raised through the publication of this information, it was decided by the Department of Energy (DOE) that total remediation of the mound be completed within the year. During the summer of 1993, IT Corporation carried out the assessment and remediation of the Project Chariot site using a streamlined approach to waste site decision making called the Observational Approach (OA), and added elements of the new DOE Streamlined Approach for Environmental Restoration (SAFER). This remediation and remediation approach is described

  11. 76 FR 46721 - Salmon-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project...

    Science.gov (United States)

    2011-08-03

    ...-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project Environmental Impact... improve the health of the ecosystem and reach the desired future condition. DATES: Comments concerning the... Ecosystem Restoration Project EIS, P.O. Box 180, 11 Casey Rd., North Fork, ID 83466. Comments may also be...

  12. A Comprehensive Probability Project for the Upper Division One-Semester Probability Course Using Yahtzee

    Science.gov (United States)

    Wilson, Jason; Lawman, Joshua; Murphy, Rachael; Nelson, Marissa

    2011-01-01

    This article describes a probability project used in an upper division, one-semester probability course with third-semester calculus and linear algebra prerequisites. The student learning outcome focused on developing the skills necessary for approaching project-sized math/stat application problems. These skills include appropriately defining…

  13. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  14. Quality assurance program plan for the Radiological Survey Activities Program - Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-01-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  15. Quality assurance program plan for the radiological survey activities program: Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-08-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  16. Management and Beneficial Reuse of Overburden Material - Linde Formerly Utilized Sites Remedial Action Program (FUSRAP) Remediation Project

    International Nuclear Information System (INIS)

    Boyle, J.D.; Schwippert, M.; Lorenz, W.D.

    2009-01-01

    This paper outlines three separate and distinct situations where the proper management of overburden material allows for the beneficial reuse of overburden material. Beneficial reuse of overburden material at the Linde Project was made possible by a simultaneous combination of physical conditions at the site in conjunction with collaborative planning and cooperation between U.S. Army Corps of Engineers - Buffalo District, New York State Department of Energy and Conservation, the Owner and Shaw Environmental and Infrastructure. Efforts by the project team focused on maintaining compliance with project plan requirements, communicating the plan to all parties, executing the plan safely and efficiently, and emphasizing fiscal responsibility to ensure maximum cost savings. (authors)

  17. Implicit Knowledge of General Upper Secondary School in a Bridge-building Project

    DEFF Research Database (Denmark)

    Rasmussen, Annette; Andreasen, Karen Egedal

    2016-01-01

    Bridge-building activities are practiced widely in the education systems of Europe. They are meant to bridge transitions between lower and upper secondary school and form a mandatory part of the youth guidance system in Denmark. By giving pupils the opportunity to experience the different...... educational context of upper secondary school, bridge-building activities are meant to facilitate their decision-making on educational paths, but also to attract more and new groups of pupils. However, the premises of the inherent differences of educational contexts and of pupils’ lacking knowledge of upper...... secondary education can be questioned. In this ethnographic case study of a bridge-building project in a rural area in Denmark, we analyse the implicit knowledge of the general upper secondary school, as it is practiced in a bridge-building project, and how it is experienced by the pupils on the background...

  18. Quality assurance plan for the molten salt reactor experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by Molten Salt Reactor Experiment (MSRE) Remediation Project personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description, Y/QD-15 Rev. 2 (Martin Marietta Energy Systems, Inc., 1995) and Environmental Management and Enrichment Facilities Work Smart Standards. This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRE Remediation Project. This QAP will be periodically reviewed, revised, and approved as necessary. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan

  19. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    International Nuclear Information System (INIS)

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work

  20. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan

  1. The Niagara Falls Storage Site Remedial Action Project. Status update and summary of special features

    International Nuclear Information System (INIS)

    Campbell, L.F.; Coxon, G.D.

    1986-01-01

    The U.S. Department of Energy (DOE) and its Project Management Contractor, Bechtel National, Inc., are conducting remedial action at the Niagara Falls Storage Site (NFSS) near Lewiston, New York to stabilize low-level radioactive wastes stored at the site and to decontaminate over two dozen contaminated vicinity properties. Over the past 4 years a 10-acre interim waste containment facility has been developed at the site to hold the approximately 250,000 yd/sup 3/ of contaminated soil and rubble from the cleanup operations. Several existing buildings were demolished or modified for burial inside the containment area. In addition, residues inside a 165-ft-high concrete tower were transferred to one of the buildings inside the containment area using hydraulic mining techniques. The residues were dewatered and covered with clay to minimize radom emanation; the tower was demolished and the rubble disposed of in the containment area. Environmental monitoring will continue throughout the interim storage period. In addition, the surface and subsurface condition of the containment structure will be monitored to ensure that undesirable trends are detected in time for corrective action to be taken. The DOE Record of Decision on the long-term disposition of the NFSS is expected to be made by the end of April, 1986

  2. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs

  3. 1992 North Dakota Economic Impact Study for the Uranium Mill Tailings Remedial Action Project, Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    1993-01-01

    The goal of the Uranium Mill Tailings Remedial Action (UMTRA) Project in North Dakota is to improve the environment and reduce the negative health effects associated with residual radioactive material (RRM) from the inactive processing sites at Belfield and Bowman, North Dakota. A secondary benefit of the UMTRA Project is economic gain. The 1992 North Dakota Economic Impact Study (NDEIS) analyzes the impact of the remedial actions at the inactive Belfield and Bowman processing sites and their associated vicinity properties. This analysis is based on the assumption that the state of North Dakota will provide 10 percent of the funding required for remediation. For every dollar the state of North Dakota invests in the Belfield and Bowman onsite portion of the UMTRA Project, it will realize $5.04 in gross labor income (i.e., gross labor income divided by the state's total funding requirement). For every dollar the state of North Dakota invests, it will realize a net return of $3.04 (i.e., net benefit divided by the state's total funding requirement). This reflects only labor expenditure and employment impact. ff state and local non-labor tax benefits were considered in the net economic benefit, North Dakota could receive significantly more than $3.04 for each dollar it invests. The UMTRA Project work at Belfield and Bowman will benefit the state of North Dakota. Benefits include a reduction in the negative health effects caused by low-level RRM, an improvement in the environment, and increased economic growth

  4. Prediction of blood lead levels in children before and after remediation of soil samples in the upper Meza Valley, Slovenia.

    Science.gov (United States)

    Jez, Erika; Lestan, Domen

    2015-10-15

    The Meza Valley, Slovenia, has been contaminated by Pb smelting, resulting in an epidemic of lead poisoning in childhood. The potential of remediation with EDTA soil washing to mitigate the risk from Pb poisoning was investigated by applying the Integrated Exposure Uptake Bio-kinetic (IEUBK) model. Soils from 79 locations were collected and the total and bio-accessible Pb concentrations were determined before and after extraction with 60 mmol kg(-1) EDTA. Extraction reduced the soil Pb concentration in towns of Mezica, Zerjav and Crna by 53, 67 and 62%, respectively, and the concentration of in vitro bio-accessible Pb in the simulated human gastric phase by 2.6-, 3.2- and 2.9-times, respectively. The predictions of the IEUBK model based on Pb contamination data were verified with data on blood Pb levels in children. The IEUBK model predicted that, after soil remediation, the number of locations at which the expected blood Pb level in children was higher than the stipulated 10 μg d L(-1) would decrease by 90, 38 and 91% in the towns of Mezica, Zerjav and Crna, respectively. The results confirmed the feasibility of soil washing with EDTA as an efficient remediation measure in Mezica and Crna and advice for soil capping/removal for the most polluted town of Zerjav. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Pilot projects for the remediation of Sillamaee uranium tailings in Estonia

    International Nuclear Information System (INIS)

    Kaasik, T.; Siinmaa, A.

    2001-01-01

    First Estonian uranium, produced in a pilot plant at Narva, was presented to Soviet military administration in 1945 and just a year later - 1946 - installation of an uranium production plant was started at Sillamaee, Estonia. Estonian local ore - alum shale - containing only 0,026% of uranium was used for uranium production for nearly five years, after the plant was launched in 1948. The uranium mine, having been activated from 1947 to 1952, was left in status of 'active conservation' for 17 years, until finally closed in 1969. Potential threats of this hidden legacy have never been revealed. After close-down of local uranium mine, more than 4 million tons of ore, imported mostly from Central and East European countries: Czechoslovakia, Hungary and Eastern Germany were processed at Sillamaee. These activities have left a large tailings impoundment with the total volume of ca. 8 million cubic meters in the immediate vicinity of the Baltic Sea. Today the plant is privatized, converted to civil purposes and provides together its power generating facilities ca. 1200 jobs in the socially sensitive area of North-East Estonia, while environmental hazards of the history, however, remain: - Continuous seepage of tailing waters into the sea contributes and would contribute over long term to the pollution of the Baltic Sea; - stability of the tailings dam seaside under present conditions can not be guaranteed thus risking a sudden release of partly liquid tailings due to potential dam failure; - uncovered surface of the tailings presents a health hazard due to dusting and radon release and hinders the revitalization of the area. The conceptual design of the Estonia's largest environmental remediation project, done by Wismut, is now complete and first implementation steps are underway. The project for mine area restoration is in initiation phase; it shall reveal the current and potential environmental hazards of the facility and create the concept for necessary rehabilitation

  6. A ''dog gone'' restoration project: Remediation of an AEC research facility

    International Nuclear Information System (INIS)

    Huff, P.E.; Brooks, B.T.

    1994-01-01

    This facility was established in 1958 by the Atomic Energy Commission. Research at the facility originally focused on the health effects from chronic exposures to radionuclides, primarily strontium 90 ( 90 Sr) and radium 226 ( 226 Ra), using beagles to simulate radiation effects on humans. In 1988 the Department of Energy (DOE) decided to close out the research program, shut down the facility and turn it over to the tenant after remediation. This paper examines the remediation activities relative to Animal Hospitals 1 and 2 (AH-1 and AH-2), the cobalt 60 ( 60 Co) source and the Specimen Storage Room. Remediation of this facility took place over one year period beginning in August 1992. Portions of the facility not requiring remediation are now a part of an ongoing research facility. While excluded from areas where remediation took place, facility personnel and others were in close proximity to the remediation, sometimes separated only by a common building wall. This close proximity required remediation techniques that stressed contamination control

  7. The DuPont, Monsanto, General Electric open-quotes Lasagnaclose quotes Remediation Project - joint R ampersand D and financing

    International Nuclear Information System (INIS)

    Palmer, P.A.

    1995-01-01

    The Lasagna project is the first of what we expect will be several large cooperative projects between industry consortia and government to develop improved remediation technologies. In 1992, Monsanto Company began contacting other major corporations to see if they were experiencing similar difficulties in applying cost-effective, or even workable technologies for industrial site remediation. Both General Electric and DuPont were early participants in the effort to develop a meeting with the EPA to discuss technical problems faced in cleanup, research needs, and ways to accelerate development of more cost-effective techniques. This paper provides some background on how this cooperative process came to reality, what the Lasagna process is and how the cooperative arrangements and financing are structured

  8. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information

  9. Overview of uranium mill tailings remedial action project of the United States of America 1995-1996

    International Nuclear Information System (INIS)

    Edge, R.

    1997-01-01

    From the early 1940's through the 1960's the United States federal government contracted for processed uranium ore for national defense research, weapons development and commercial nuclear energy. When these contracts were terminated, the mills ceased operation leaving large uranium tailings on the former mill sites. The purpose of the Uranium Remedial Action Project (UMTRA) is to minimize or eliminate potential health hazards resulting from exposure of the public to the tailings at these abandons sites. There are 24 inactive uranium mill tailings sites, in 10 states and an Indian reservation lands, included for clean up under the auspices of UMTRA. Presently the last 2 sites are under remediation. This paper addresses the progress of the project over the last two years. (author)

  10. Multiweek Cell Culture Project for Use in Upper-Level Biology Laboratories

    Science.gov (United States)

    Marion, Rebecca E.; Gardner, Grant E.; Parks, Lisa D.

    2012-01-01

    This article describes a laboratory protocol for a multiweek project piloted in a new upper-level biology laboratory (BIO 426) using cell culture techniques. Human embryonic kidney-293 cells were used, and several culture media and supplements were identified for students to design their own experiments. Treatments included amino acids, EGF,…

  11. New roles for mathematics in multi-disciplinary,upper secondary school projects

    DEFF Research Database (Denmark)

    Lindenskov, Lena; Andresen, Mette

    2009-01-01

    A new concept, compulsory multi-disciplinary courses, was introduced in upper secondary school curriculum as a central part of a recent reform. This paper reports from a case study of such a triple/four-disciplinary project in mathematics, physics, chemistry and ‘general study preparation...

  12. Project Strategy For The Remediation And Disposition Of Legacy Transuranic Waste At The Savannah River Site, South Carolina, USA

    International Nuclear Information System (INIS)

    Rodriguez, M.

    2010-01-01

    This paper discusses the Savannah River Site Accelerated Transuranic (TRU) Waste Project that was initiated in April of 2009 to accelerate the disposition of remaining legacy transuranic waste at the site. An overview of the project execution strategy that was implemented is discussed along with the lessons learned, challenges and improvements to date associated with waste characterization, facility modifications, startup planning, and remediation activities. The legacy waste was generated from approximately 1970 through 1990 and originated both on site as well as at multiple US Department of Energy sites. Approximately two thirds of the waste was previously dispositioned from 2006 to 2008, with the remaining one third being the more hazardous waste due to its activity (curie content) and the plutonium isotope Pu-238 quantities in the waste. The project strategy is a phased approach beginning with the lower activity waste in existing facilities while upgrades are made to support remediation of the higher activity waste. Five waste remediation process lines will be used to support the full remediation efforts which involve receipt of the legacy waste container, removal of prohibited items, venting of containers, and resizing of contents to fit into current approved waste shipping containers. Modifications have been minimized to the extent possible to meet the accelerated goals and involve limited upgrades to address life safety requirements, radiological containment needs, and handling equipment for the larger waste containers. Upgrades are also in progress for implementation of the TRUPACT III for the shipment of Standard Large Boxes to the Waste Isolation Pilot Plant, the US TRU waste repository. The use of this larger shipping container is necessary for approximately 20% of the waste by volume due to limited size reduction capability. To date, approximately 25% of the waste has been dispositioned, and several improvements have been made to the overall processing

  13. Identification of remediation needs and technology development focus areas for the Environmental Restoration (ER) Project at Sandia National Laboratories/New Mexico (SNL/NM)

    International Nuclear Information System (INIS)

    Tucker, M.D.

    1995-06-01

    The Environmental Restoration (ER) Project has been tasked with the characterization, assessment, remediation and long-term monitoring of contaminated waste sites at Sandia National Laboratories/New Mexico (SNL/NM). Many of these sites will require remediation which will involve the use of baseline technologies, innovative technologies that are currently under development, and new methods which will be developed in the near future. The Technology Applications Program (TAP) supports the ER Project and is responsible for development of new technologies for use at the contaminated waste sites, including technologies that will be used for remediation and restoration of these sites. The purpose of this report is to define the remediation needs of the ER Project and to identify those remediation needs for which the baseline technologies and the current development efforts are inadequate. The area between the remediation needs and the existing baseline/innovative technology base represents a technology gap which must be filled in order to remediate contaminated waste sites at SNL/NM economically and efficiently. In the first part of this report, the remediation needs of the ER Project are defined by both the ER Project task leaders and by TAP personnel. The next section outlines the baseline technologies, including EPA defined Best Demonstrated Available Technologies (BDATs), that are applicable at SNL/NM ER sites. This is followed by recommendations of innovative technologies that are currently being developed that may also be applicable at SNL/NM ER sites. Finally, the gap between the existing baseline/innovative technology base and the remediation needs is identified. This technology gap will help define the future direction of technology development for the ER Project

  14. Risk assessment guidance document for the UMTRA project groundwater remediation phase

    International Nuclear Information System (INIS)

    1992-05-01

    The purpose of the groundwater remedial activities at the Uranium Mill Tailings Remedial Action (UMTRA) sites is to reduce, control, or eliminate risks to human health and the environment. This is in accordance with Subpart B of 40 CFR 192. According to this regulation, the need for groundwater restoration is based upon US Environmental Protection Agency (EPA)-defined groundwater cleanup standards and must be consistent with the National Environmental Policy Act (NEPA) process. Risk assessments will be used in the UMTRA Groundwater Program to aid in the evaluation of sites. Risk assessments are conducted for four purposes: (1) Preliminary risk assessments are used to aid in prioritizing sites, scope data collection, end determine if a site presents immediate health risks. (2) Baseline risk assessments provide a comprehensive integration and interpretation of demographic, geographic, physical, chemical, and biological factors at a site to determine the extent of actual or potential harm. This information Is used to determine the need for remedial action. (3) Risk evaluation of remedial alternatives is performed to evaluate risks to humans or the environment associated with the various remedial strategies. (4) After remediation, an evaluation of residual risks is conducted. The information gathered for each of these risk evaluations is used to determine the need for subsequent evaluation. Several sites may be eliminated after a preliminary risk assessment if there is no current or future threat to humans or the environment. Likewise, much of the data from a baseline risk assessment can be used to support alternate concentration limits or supplemental standards demonstrations, or identify sensitive habitats or receptors that may be of concern in selecting a remedy

  15. Completion report for the Inactive Liquid Low-Level Waste Tank Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    This report documents the results of the Inactive Liquid Low-Level Waste Tank Remediation Project at Oak Ridge National Laboratory (ORNL). The work performed is compared with that proposed in the statement of work and the service contract specification for the maintenance action to remediate tanks 3013, 3004-B, T-30, and 3001-B. The Federal Facility Agreement (FFA) among the U.S. Environmental Protection Agency (EPA), the Tennessee Department of Environment and Conservation (TDEC), and the U.S. Department of Energy (DOE) requires that all tanks, which have been removed from service and are designated in the FFA as Category D, must be remediated in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. The Environmental Restoration Program's inactive tank removal program strategy and plans for remediating the inactive LLLW tanks were documented in a report issued in January 1995 (Inactive Tanks Remediation Program Strategy and Plans for Oak Ridge National Laboratory, Oak Ridge, Tennessee, ORNL/ER-297). The inactive (Category D) tanks were initially screened for remediation according to risk, remediation technology required, level of instrumentation available, interferences with other piping and equipment, location, and available sludge removal techniques and storage requirements. On the basis of this preliminary screening, the tanks were assigned to one of five batches (I through V) for consideration of remedial action alternatives, and these batches were tentatively scheduled for remedial actions. The eight links tentatively assigned to Batch I were divided into two groups (Series I and Series II)

  16. DIAS Project: The establishment of a European digital upper atmosphere server

    Science.gov (United States)

    Belehaki, A.; Cander, Lj.; Zolesi, B.; Bremer, J.; Juren, C.; Stanislawska, I.; Dialetis, D.; Hatzopoulos, M.

    2005-08-01

    The main objective of DIAS (European Digital Upper Atmosphere Server) project is to develop a pan-European digital data collection on the state of the upper atmosphere, based on real-time information and historical data collections provided by most operating ionospheric stations in Europe. A DIAS system will distribute information required by various groups of users for the specification of upper atmospheric conditions over Europe suitable for nowcasting and forecasting purposes. The successful operation of the DIAS system will lead to the development of new European added-value products and services, to the effective use of observational data in operational applications and consequently to the expansion of the relevant European market.

  17. A Lifecycle Knowledge Management Approach to Support Decommissioning and Environmental Remediation Projects

    International Nuclear Information System (INIS)

    Borrmann, F.; Booth, P.

    2016-01-01

    Full text: KM is a discipline that has a long tradition in nuclear. Nevertheless, the necessity for and the specifics of KM in decommissioning and environmental remediation have come into focus but quite recently. On one hand driven by major decommissioning programs like the NDA approach in UK or the phase-out decision in Germany, on the other hand as a request from decommissioning practitioners. In this paper we would like to emphasize the necessity to develop lifecycle wide KM approaches and specific tools for KM in decommissioning and environmental remediation. Additionally, KM approaches must be adapted to the phases of the facilities lifecycle. Especially decommissioning and environmental remediation require different KM systems to cope with a quickly changing environment. (author

  18. Changes in groundwater recharge under projected climate in the upper Colorado River basin

    Science.gov (United States)

    Tillman, Fred; Gangopadhyay, Subhrendu; Pruitt, Tom

    2016-01-01

    Understanding groundwater-budget components, particularly groundwater recharge, is important to sustainably manage both groundwater and surface water supplies in the Colorado River basin now and in the future. This study quantifies projected changes in upper Colorado River basin (UCRB) groundwater recharge from recent historical (1950–2015) through future (2016–2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 climate projections. Simulated future groundwater recharge in the UCRB is generally expected to be greater than the historical average in most decades. Increases in groundwater recharge in the UCRB are a consequence of projected increases in precipitation, offsetting reductions in recharge that would result from projected increased temperatures.

  19. Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Donald L.; Ramsey, Susan S.; Finn, Kevin P.; Chaloupka, Allan B. [Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States)

    2012-07-01

    Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious

  20. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  1. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    International Nuclear Information System (INIS)

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-01-01

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely

  2. The CAMU Rule: A tool for implementing a protective, cost-effective remedy at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Dupuis-Nouille, E.M.; Goidell, L.C.; Strimbu, M.J.

    1995-01-01

    The Fernald Environmental Management Project (FEMP) is a former uranium processing facility currently under remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act as amended (CERCLA). Contamination at the FEMP consists of low-level radioactivity, hazardous substances, hazardous wastes and/or mixed wastes. Regulations promulgated under the Resource Conservation and Recovery Act as amended (RCRA) are evaluated as applicable or relevant and appropriate requirements (ARARs) for remediation of the FEMP. Historically, joint CERCLA-RCRA guidance dictated that hazardous waste could not be treated, or moved out of the designated area of contiguous contamination (AOC), without triggering land disposal restrictions (LDRs) or minimum technology requirements (MTRs). To avoid invoking these stringent requirements, in situ capping was chosen as the lower cost remedy at many sites, although on-site disposal and/or treatment of hazardous wastes would have been more protective. The Corrective Action Management Units (CAMUs) and Temporary Units (TUs) Final Rule [58 FR 8658, Vol. 58, No. 29, hereinafter the open-quotes CAMU Ruleclose quotes], promulgated on February 16, 1993, provides facilities regulated under RCRA corrective action authority with greater flexibility to move, treat, and dispose of wastes on site without triggering LDRs or MTRs, thereby encouraging application of innovative technologies and more protective remedies. The waste acceptance criteria for the on-site disposal facility is based on site-specific considerations including the mobility of the contaminants through the underlying site geology and the protectiveness of the engineered liners. Application of the open-quotes CAMU Ruleclose quotes allows for disposition in the on-site facility based on these technical considerations rather than on regulatory classifications

  3. The ultrasonic ranging and data system for radiological surveys in the UMTRA [Uranium Mill Tailings Remedial Action] Project

    International Nuclear Information System (INIS)

    Little, C.A.; Berven, B.A.; Blair, M.S.; Dickerson, K.S.; Pickering, D.A.

    1988-01-01

    The Ultrasonic Ranging and Data System (USRADS) was developed to allow radiation exposure data and positional information to be collected, stored and analyzed in a more efficient manner than currently employed on the (Uranium Mill Tailings Remedial Action (UMTRA) project. USRADS is a portable unit which employs ultrasonics, radio frequency transmissions, and a personal computer. Operational experience indicates that the system results in increased information about the property with decreased data analysis and transcription effort and only slightly more field effort. 5 refs., 3 figs., 2 tabs

  4. Remedial investigation work plan for the Upper East Fork Poplar Creek characterization area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions. The need to complete RIs in a timely manner resulted in the establishment of the Upper East Fork Poplar Creek (UEFPC) Characterization Area (CA) and the Bear Creek CA. The CA approach considers the entire watershed and examines all appropriate media within it. The UEFPC CA, which includes the main Y-12 Plant area, is an operationally and hydrogeologically complex area that contains numerous contaminants and containment sources, as well as ongoing industrial and defense-related activities. The UEFPC CA also is the suspected point of origin for off-site groundwater and surface-water contamination. The UEFPC CA RI also will address a carbon-tetrachloride/chloroform-dominated groundwater plume that extends east of the DOE property line into Union Valley, which appears to be connected with springs in the valley. In addition, surface water in UEFPC to the Lower East Fork Poplar Creek CA boundary will be addressed. Through investigation of the entire watershed as one ''site,'' data gaps and contaminated areas will be identified and prioritized more efficiently than through separate investigations of many discrete units.

  5. Master plan for remediation of the Sillamaee tailings pond and technical design project

    International Nuclear Information System (INIS)

    Kaasik, T.

    2000-01-01

    Remediation of the Sillamaee radioactive tailings pond is a priority in the Estonian National Environmental Plan. The Sillamaee plant has processed metal ores by hydrometallurgical methods since 1946. Processing continued until 1990, but in the 1970s, production of rare earths and rare metals was introduced and continues today at a smaller scale. The tailings pond contains residues from these operations. The environmental problems associated with the tailings pond are the stability of the dam and the release of contaminants. In order to deal with these two issues effectively, a master plan was drawn up. The master plan covers the period from 1997 to 2008 and was compiled with the cooperation of the Silmet Group and the Sillamaee International Expert Reference Group (SIERG). The master plan sets up a systematic approach for the overall tailings pond remediation, including drying its interior, reshaping and covering the surface, minimizing water flow through the tailings, and ensuring long-term dam stability

  6. SF Box--a tool for evaluating the effects on soil functions in remediation projects.

    Science.gov (United States)

    Volchko, Yevheniya; Norrman, Jenny; Rosén, Lars; Norberg, Tommy

    2014-10-01

    Although remediation is usually aimed at reducing the risks posed by contaminants to human health and the environment, it is also desirable that the remediated soil within future green spaces is capable of providing relevant ecological functions, e.g., basis for primary production. Yet while addressing a contamination problem by reducing contaminant concentration and/or amounts in the soil, the remedial action itself can lead to soil structure disturbances, decline in organic matter and nutrient deficiencies, and in turn affect a soil's capacity to carry out its ecological soil functions. This article presents the Soil Function Box (SF Box) tool that is aimed to facilitate integration of information from suggested soil quality indicators (SQIs) into a management process in remediation using a scoring method. The scored SQIs are integrated into a soil quality index corresponding to 1 of 5 classes. SF Box is applied to 2 cases from Sweden (Kvillebäcken and Hexion), explicitly taking into consideration uncertainties in the results by means of Monte Carlo simulations. At both sites the generated soil quality indices corresponded to a medium soil performance (soil class 3) with a high certainty. The main soil constraints at both Kvillebäcken and Hexion were associated with biological activity in the soil, as soil organisms were unable to supply plant-available N. At the Kvillebäcken site the top layer had a content of coarse fragment (ø > 2 mm) higher than 35%, indicating plant rooting limitations. At the Hexion site, the soil had limited amount of organic matter, thus poor aggregate stability and nutrient cycling potential. In contrast, the soil at Kvillebäcken was rich in organic matter. The soils at both sites were capable of storing a sufficient amount of water for soil organisms between precipitation events. © 2014 SETAC.

  7. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    Energy Technology Data Exchange (ETDEWEB)

    Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  8. Kashechewan First Nation St. Andrews School oil remediation project: a case study

    International Nuclear Information System (INIS)

    Gable, S. W.

    1997-01-01

    Case study of the remediation of an oil seepage into a school building in a First Nations community, on the shores of the Albany River, in the James Bay region of northern Ontario, was discussed. The spill has created significant health hazards as manifested by nausea, vomiting and severe headaches among both students and teachers. Investigation determined that the O-ring fittings of the pipe joints, used during the installation of the oil pipeline linking the above-ground oil tank farm and the school building, were unsuitable for the intended use. They subsequently failed, allowing heating oil to leak from the pipes along the building and migrating into the gymnasium. A variety of remediation alternatives have been considered. The remedial actions taken include: in-situ containment using an impermeable membrane with passive venting and continuous air quality monitoring for the area below the recreation complex, excavation to create draining trenches, replacement of contaminated soil around the building and from the building to the river, and installation of a clay collar and oil/water separator in each drain line. The work was completed in January 1996. To date, all systems function satisfactorily

  9. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  10. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan

  11. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    International Nuclear Information System (INIS)

    1993-01-01

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information

  12. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-12-31

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  13. An overview of radiolysis studies for the molten salt reactor remediation project

    International Nuclear Information System (INIS)

    Icenhour, A.S.; Williams, D.F.; Trowbridge, L.D.; Toth, L.M.; Del Cul, G.D.

    2001-01-01

    A number of radiolysis experiments have been performed in support of the remediation of the Molten Salt Reactor Experiment (MSRE)at the Oak Ridge National Laboratory.Materials studied included simulated MSRE fuel salt,fluorinated charcoal, NH 4 F,2NaFUF 6 ,UO 2 F 2 uranium oxides with a known residual fluoride content,and uranium oxides with a known moisture content.The results from these studies were used as part of the basis for the interim or long-term storage of materials removed from the MSRE. (author)

  14. Upper ankle joint space detection on low contrast intraoperative fluoroscopic C-arm projections

    Science.gov (United States)

    Thomas, Sarina; Schnetzke, Marc; Brehler, Michael; Swartman, Benedict; Vetter, Sven; Franke, Jochen; Grützner, Paul A.; Meinzer, Hans-Peter; Nolden, Marco

    2017-03-01

    Intraoperative mobile C-arm fluoroscopy is widely used for interventional verification in trauma surgery, high flexibility combined with low cost being the main advantages of the method. However, the lack of global device-to- patient orientation is challenging, when comparing the acquired data to other intrapatient datasets. In upper ankle joint fracture reduction accompanied with an unstable syndesmosis, a comparison to the unfractured contralateral site is helpful for verification of the reduction result. To reduce dose and operation time, our approach aims at the comparison of single projections of the unfractured ankle with volumetric images of the reduced fracture. For precise assessment, a pre-alignment of both datasets is a crucial step. We propose a contour extraction pipeline to estimate the joint space location for a prealignment of fluoroscopic C-arm projections containing the upper ankle joint. A quadtree-based hierarchical variance comparison extracts potential feature points and a Hough transform is applied to identify bone shaft lines together with the tibiotalar joint space. By using this information we can define the coarse orientation of the projections independent from the ankle pose during acquisition in order to align those images to the volume of the fractured ankle. The proposed method was evaluated on thirteen cadaveric datasets consisting of 100 projections each with manually adjusted image planes by three trauma surgeons. The results show that the method can be used to detect the joint space orientation. The correlation between angle deviation and anatomical projection direction gives valuable input on the acquisition direction for future clinical experiments.

  15. ISS Internal Active Thermal Control System (IATCS) Coolant Remediation Project -2006 Update

    Science.gov (United States)

    Morrison, Russell H.; Holt, Mike

    2006-01-01

    The IATCS coolant has experienced a number of anomalies in the time since the US Lab was first activated on Flight 5A in February 2001. These have included: 1) a decrease in coolant pH, 2) increases in inorganic carbon, 3) a reduction in phosphate concentration, 4) an increase in dissolved nickel and precipitation of nickel salts, and 5) increases in microbial concentration. These anomalies represent some risk to the system, have been implicated in some hardware failures and are suspect in others. The ISS program has conducted extensive investigations of the causes and effects of these anomalies and has developed a comprehensive program to remediate the coolant chemistry of the on-orbit system as well as provide a robust and compatible coolant solution for the hardware yet to be delivered. This paper presents a status of the coolant stability over the past year as well as results from destructive analyses of hardware removed from the on-orbit system and the current approach to coolant remediation.

  16. Changes in Projected Spatial and Seasonal Groundwater Recharge in the Upper Colorado River Basin.

    Science.gov (United States)

    Tillman, Fred D; Gangopadhyay, Subhrendu; Pruitt, Tom

    2017-07-01

    The Colorado River is an important source of water in the western United States, supplying the needs of more than 38 million people in the United States and Mexico. Groundwater discharge to streams has been shown to be a critical component of streamflow in the Upper Colorado River Basin (UCRB), particularly during low-flow periods. Understanding impacts on groundwater in the basin from projected climate change will assist water managers in the region in planning for potential changes in the river and groundwater system. A previous study on changes in basin-wide groundwater recharge in the UCRB under projected climate change found substantial increases in temperature, moderate increases in precipitation, and mostly periods of stable or slight increases in simulated groundwater recharge through 2099. This study quantifies projected spatial and seasonal changes in groundwater recharge within the UCRB from recent historical (1950 to 2015) through future (2016 to 2099) time periods, using a distributed-parameter groundwater recharge model with downscaled climate data from 97 Coupled Model Intercomparison Project Phase 5 (CMIP5) climate projections. Simulation results indicate that projected increases in basin-wide recharge of up to 15% are not distributed uniformly within the basin or throughout the year. Northernmost subregions within the UCRB are projected an increase in groundwater recharge, while recharge in other mainly southern subregions will decline. Seasonal changes in recharge also are projected within the UCRB, with decreases of 50% or more in summer months and increases of 50% or more in winter months for all subregions, and increases of 10% or more in spring months for many subregions. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  17. Independent Verification Survey of the Clean Coral Storage Pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project

    International Nuclear Information System (INIS)

    Wilson-Nichols, M.J.; Egidi, P.V.; Roemer, E.K.; Schlosser, R.M.

    2000-01-01

    f I The Oak Ridge National Laboratory (ORNL) Environmental Technology Section conducted an independent verification (IV) survey of the clean storage pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project (JAPCSRP) from January 18-25, 1999. The goal of the JAPCSRP is to restore a 24-acre area that was contaminated with plutonium oxide particles during nuclear testing in the 1960s. The selected remedy was a soil sorting operation that combined radiological measurements and mining processes to identify and sequester plutonium-contaminated soil. The soil sorter operated from about 1990 to 1998. The remaining clean soil is stored on-site for planned beneficial use on Johnston Island. The clean storage pile currently consists of approximately 120,000 m3 of coral. ORNL conducted the survey according to a Sampling and Analysis Plan, which proposed to provide an IV of the clean pile by collecting a minimum number (99) of samples. The goal was to ascertain wi th 95% confidence whether 97% of the processed soil is less than or equal to the accepted guideline (500-Bq/kg or 13.5-pCi/g) total transuranic (TRU) activity

  18. Independent Technical Review of the C-400 Interim Remedial Project Phase I Results, Paducah, Kentucky

    International Nuclear Information System (INIS)

    Looney, B.; Rossabi, J.; Stewart, L.; Richards, W.

    2010-01-01

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior

  19. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    Energy Technology Data Exchange (ETDEWEB)

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in

  20. Teacher Learning within a Multinational Project in an Upper Secondary School

    Directory of Open Access Journals (Sweden)

    Liisa Ilomäki

    2017-01-01

    Full Text Available In this case study, we investigated teachers’ professional learning within a multinational project in an upper secondary school. The aim of the study was to investigate how the participating teachers adopted and applied the trialogical approach (TLA in their pedagogical practices and their challenges in doing that. The mixed method approach was used for data collection and analysis. About one-fourth of the teachers participated in the activities, ten females and three males. Three groups were identified, based on their activity in the project: pilot teachers, active adopters, and adopters. Altogether 79 students (38 males and 41 females answered a questionnaire concerning the pedagogical practices. The pedagogical revisions were well in line with TLA; the revised courses as well as new iterations and new ideas were indicators of the teachers’ creative implementation processes. However, some of the TLA ideas were more difficult to apply in an upper secondary school context; for example, the implementation of ideas involving cross-fertilization with other organizations and cultures was rare. In order to learn new pedagogical practices, teachers need organized time for collaborative planning, for reflecting, and for sharing.

  1. Habitat Evaluation Procedures (HEP) Report; Upper Trimble Project, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Upper Trimble property, an acquisition completed by the Kalispel Tribe of Indians in March 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Upper Trimble Project provides a total of 250.67 Habitat Units (HUs) for the species evaluated. Wet meadow provides 136.92 HUs for mallard, muskrat, and Canada goose. Mixed forest habitat provides 111.88 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Scrub-shrub vegetation provides 1.87 HUs for yellow warbler, and white-tailed deer. The objective of using HEP at the Upper Trimble Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  2. Remedial investigation report on Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2: Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report comprises appendices A--J which support the Y-12 Plant`s remedial action report involving Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch). The appendices cover the following: Sampling fish from McCoy Branch; well and piezometer logs; ecological effects of contaminants in McCoy Branch 1989-1990; heavy metal bioaccumulation data; microbes in polluted sediments; and baseline human health risk assessment data.

  3. Remedial investigation report on Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2: Appendixes

    International Nuclear Information System (INIS)

    1994-08-01

    This report comprises appendices A--J which support the Y-12 Plant's remedial action report involving Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch). The appendices cover the following: Sampling fish from McCoy Branch; well and piezometer logs; ecological effects of contaminants in McCoy Branch 1989-1990; heavy metal bioaccumulation data; microbes in polluted sediments; and baseline human health risk assessment data

  4. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities by meeting Environmental Protection Agency (EPA) ground water standards. One of the first steps in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). The EPA standards allow the use of different strategies for achieving compliance with the standards. This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. Each of the four alternatives evaluated in the PEIS is based on a different mix of strategies to meet EPA ground water standards. The PEIS is intended to serve as a programmatic planning document that provides an objective basis for determining site-specific ground water compliance strategies and data and information that can be used to prepare site-specific environmental impact analyses more efficiently. DOE will prepare appropriate further National Environmental Policy Act documentation before making site-specific decisions to implement the Ground Water Project. Affected States, Tribes, local government agencies, and members of the public have been involved in the process of preparing this PEIS; DOE encourages their continued participation in the site-specific decision making process

  5. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  6. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status to date January 1998

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments

  7. Permeable reactive barriers for the remediation of groundwater in a mining area: results for a pilot-scale project

    Science.gov (United States)

    Martinez-Sanchez, Maria Jose; Perez-Sirvent, Carmen; Garcia-Lorenzo, Maria Luz; Martinez-Lopez, Salvadora; Perez-Espinosa, Victor; Gonzalez-Ciudad, Eva; Belen Martinez-Martinez, Lucia; Hernandez, Carmen; Molina-Ruiz, Jose

    2017-04-01

    The Sierra Minera of Cartagena-La Union is located in the Region of Murcia, Southeast of Spain. This zone presents high levels of heavy metals due to natural, geogenic reasons. In addition, the prolonged mining activity, and subsequent abandonment of farms, has had consequences on the environment, including severe affectation of the groundwater in the area. To remediate this situation, the Permeable Reactive Barrier (PRB) technology was assayed, which required in addition to the hydro-geological study of the zone, a careful optimization study for the design and construction of PRBs. For such a purpose a pilot-scale project was developed, and this communication reports some of the most relevant findings obtained after a four-years monitorization period. The selected reactive material for the PRBs was limestone filler. The filler is a waste material produced in many factories in the zone. These residues have good adsorption properties, high alkalinity, low cost and high availability, which make them suitable for use in remediation. The PRB was constituted by a 50% limestone filler and 50% sand, a proportion optimized by means of independent batch experiments. A layer of gravel was placed at the top, and on it a layer of natural soil. The barrier was designed in the form of a continuous trench, because the level of the contaminated groundwater was not very deep. In this way, the barrier could be prepared with standard excavation equipment. Parallel to the barrier, 6 wells where arranged downstream for sample collection. The pH and conductivity of the samples was measured directly in situ, and the content of Zn, Cd, Cu, Fe, and Pb were analyzed in the laboratory. All the samples collected after the PRB was constructed had basic pH values between 7.5 and 8. The conductivity was between 5 and 11 mS / cm except for the well 4, which had a value of 3.70 mS / cm. The concentration values of trace elements were below the detection limit (atomic absorption measurement) in

  8. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    International Nuclear Information System (INIS)

    1995-01-01

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE's UMTRA Project is the world's largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation

  9. Completion of the uranium mill tailings remedial project and cleanup of the former mill site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    Rael, G.J.; Cox, S.W.; Artiglia, E.W.

    2000-01-01

    The United States Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Surface Project has successfully completed the cleanup of 22 former uranium mill sites, more than 5400 vicinity properties, and has constructed 18 entombment cells. The Project has recently received the United States Nuclear Regulatory Commission's approval and certification for the last two disposal sites, with these sites being placed under the general license for long term custodial care of residual radioactive material. The UMTRA site located at Grand Junction, Colorado is a good example of the technical, political, economic, and public relations challenges that were overcome in achieving success. The UMTRA Team discussed, negotiated, planned, and eventually acted on this uranium mill tailings problem and brought the project to a successful conclusion for the community. From the early 1940s through the 1970s, uranium ore was mined in significant quantities under United States federal contracts for the government's national defence programmes, i.e. the Manhattan Engineering District and Atomic Energy Commission programmes. The problem started as the need for uranium decreased in the late 1960s, resulting in mills shutting down, leaving behind large quantities of process waste tailings and contaminated mill buildings. The former Climax Uranium Company mill site in Grand Junction was one of the largest of these sites. (author)

  10. Assessment of risks due to climate change for the Upper Tamakoshi Hydropower Project in Nepal

    Directory of Open Access Journals (Sweden)

    Sangam Shrestha

    2016-01-01

    Full Text Available Climate change poses significant challenges to hydropower development and management in mountainous basins. This study examined the impact of climate change, and the associated risks, on the energy production of the Upper Tamakoshi Hydropower Project, which is located in the Tamakoshi basin of Nepal. The outputs of three GCMs—namely MIROC-ESM, MRI-CGCM3, and MPI-ESM-M—under the Representative Concentration Pathways (RCP scenarios were used for the projection of precipitation and temperature in the future. The minimum and maximum temperatures of the basin are projected to increase by 6.33 °C and 3.82 °C, respectively, by 2100. The projected precipitation varies from −8% to +24.8%, which is expected to alter the streamflow by −37.83% to +47% in the future. Based on the streamflow output, the risk for energy production was calculated with respect to the baseline energy production of 1963 GW h and 2281 GW h. Using the three GCMs, the risk associated with annual hydropower production under altered runoff was analyzed. The risk percentage in the future periods shows a mild risk varying from 0.69% to 6.63%. MPI-ESM-M GCM projects a higher percentage of risk for energy production during the same future periods, as compared to the baseline energy production of 1963 GW h. A mild to moderate risk, ranging from 2.73% to 13.24% can be expected when energy production in the future is compared to the baseline energy production of 2281 GW h.

  11. Groundwater remediation project at Stockem railway station following a pollution with MIAK (Methyl Isoamyl Ketone)

    Energy Technology Data Exchange (ETDEWEB)

    Daelemans, A.; Boden, A.; Schuyteneer, L.W. de; Achter, L.H. van [Soil Service of Belgium, Leuven-Heverlee (Belgium)

    2003-07-01

    On the 20{sup th} of January 2000, a derailment accident happened near the railway station of Stockem in the vicinity of the city of Arlon. An estimated 20.000 litres of MIAK (methyl isoamyl ketone or 5-methyl-2-hexanone) was spilled and lost into the soil. Immediately after the accident, the Soil Service of Belgium received a request from the Belgian National Railway Company to establish an emergency plan for the remediation of the spill, including the design and the follow-up of the clean up operations. The calamity happened to the West of the railway station at a height of 360 m above sea level and in the vicinity of the Semois river (200 m to the South). From a geological point of view, the Formation of Florenville is outcropping at the site. This formation is characterized by an alternation of sandy sediments and sandstone layers. Locally the rock layer are porous allowing vertical migration of the water. The formation is an important but vulnerable aquifer. Further to the South, water is extracted from the aquifer in large quantities for both public distribution and bottling purposes. The spilled product, 5-methyl-2-hexanone (MIAK), has a typical fruity odour and its density is slightly lower than water. The product is relative mobile and fairly easy degraded biologically in low concentrations. (orig.)

  12. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress ''that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab

  13. The upper end of climate model temperature projections is inconsistent with past warming

    International Nuclear Information System (INIS)

    Stott, Peter; Good, Peter; Jones, Gareth; Gillett, Nathan; Hawkins, Ed

    2013-01-01

    Climate models predict a large range of possible future temperatures for a particular scenario of future emissions of greenhouse gases and other anthropogenic forcings of climate. Given that further warming in coming decades could threaten increasing risks of climatic disruption, it is important to determine whether model projections are consistent with temperature changes already observed. This can be achieved by quantifying the extent to which increases in well mixed greenhouse gases and changes in other anthropogenic and natural forcings have already altered temperature patterns around the globe. Here, for the first time, we combine multiple climate models into a single synthesized estimate of future warming rates consistent with past temperature changes. We show that the observed evolution of near-surface temperatures appears to indicate lower ranges (5–95%) for warming (0.35–0.82 K and 0.45–0.93 K by the 2020s (2020–9) relative to 1986–2005 under the RCP4.5 and 8.5 scenarios respectively) than the equivalent ranges projected by the CMIP5 climate models (0.48–1.00 K and 0.51–1.16 K respectively). Our results indicate that for each RCP the upper end of the range of CMIP5 climate model projections is inconsistent with past warming. (letter)

  14. Tank waste remediation system privatization phase I infrastructure, project W-519, Quality Assurance implementation plan

    International Nuclear Information System (INIS)

    HUSTON, J.J.

    1999-01-01

    This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001

  15. Gunite and associated tanks remediation project recycling and waste minimization effort

    International Nuclear Information System (INIS)

    Van Hoesen, S.D.; Saunders, A.D.

    1998-05-01

    The Department of Energy's Environmental Management Program at Oak Ridge National Laboratory has initiated clean up of legacy waste resulting from the Manhattan Project. The gunite and associated tanks project has taken an active pollution prevention role by successfully recycling eight tons of scrap metal, reusing contaminated soil in the Area of Contamination, using existing water (supernate) to aid in sludge transfer, and by minimizing and reusing personal protective equipment (PPE) and on-site equipment as much as possible. Total cost savings for Fiscal Year 1997 activities from these efforts are estimated at $4.2 million dollars

  16. Process Knowledge Characterization of Radioactive Waste at the Classified Waste Landfill Remediation Project Sandia National Laboratories, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    DOTSON, PATRICK WELLS; GALLOWAY, ROBERT B.; JOHNSON JR, CARL EDWARD

    1999-01-01

    This paper discusses the development and application of process knowledge (PK) to the characterization of radioactive wastes generated during the excavation of buried materials at the Sandia National Laboratories/New Mexico (SNL/NM) Classified Waste Landfill (CWLF). The CWLF, located in SNL/NM Technical Area II, is a 1.5-acre site that received nuclear weapon components and related materials from about 1950 through 1987. These materials were used in the development and testing of nuclear weapon designs. The CWLF is being remediated by the SNL/NM Environmental Restoration (ER) Project pursuant to regulations of the New Mexico Environment Department. A goal of the CWLF project is to maximize the amount of excavated materials that can be demilitarized and recycled. However, some of these materials are radioactively contaminated and, if they cannot be decontaminated, are destined to require disposal as radioactive waste. Five major radioactive waste streams have been designated on the CWLF project, including: unclassified soft radioactive waste--consists of soft, compatible trash such as paper, plastic, and plywood; unclassified solid radioactive waste--includes scrap metal, other unclassified hardware items, and soil; unclassified mixed waste--contains the same materials as unclassified soft or solid radioactive waste, but also contains one or more Resource Conservation and Recovery Act (RCRA) constituents; classified radioactive waste--consists of classified artifacts, usually weapons components, that contain only radioactive contaminants; and classified mixed waste--comprises radioactive classified material that also contains RCRA constituents. These waste streams contain a variety of radionuclides that exist both as surface contamination and as sealed sources. To characterize these wastes, the CWLF project's waste management team is relying on data obtained from direct measurement of radionuclide activity content to the maximum extent possible and, in cases where

  17. An assessment of plant biointrusion at the Uranium Mill Tailings Remedial Action Project rock-covered disposal cells

    International Nuclear Information System (INIS)

    1990-10-01

    This study is one of a number of special studies that have been conducted regarding various aspects of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This special study was proposed following routine surveillance and maintenance surveys and observations reported in a special study of vegetative covers (DOE, 1988), in which plants were observed growing up through the rock erosion layer at recently completed disposal cells. Some of the plants observed were deep-rooted woody species, and questions concerning root intrusion into disposal cells and the need to control plant growth were raised. The special study discussed in this report was designed to address some of the ramifications of plant growth on disposal cells that have rock covers. The NRC has chosen rock covers over vegetative covers in the arid western United States because licenses cannot substantiate that the vegetative covers ''will be significantly greater than 30 percent and preferably 70 percent,'' which is the amount of ''vegetation required to reduce flow to a point of stability.'' The potential impacts of vegetation growing in rock covers are not addressed by the NRC (1990). The objectives, then, of this study were to determine the species of plants growing on two rock-covered disposal cells, study the rooting pattern of plants on these cells, and identify possible impacts of plant root penetration on these and other UMTRA Project rock-covered cells

  18. Remedial investigation sampling and analysis plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Prasad, S.; Martino, L.; Patton, T.

    1995-03-01

    J-Field encompasses about 460 acres at the southern end of the Gunpowder Neck Peninsula in the Edgewood Area of APG (Figure 2.1). Since World War II, the Edgewood Area of APG has been used to develop, manufacture, test, and destroy chemical agents and munitions. These materials were destroyed at J-Field by open burning and open detonation (OB/OD). For the purposes of this project, J-Field has been divided into eight geographic areas or facilities that are designated as areas of concern (AOCs): the Toxic Burning Pits (TBP), the White Phosphorus Burning Pits (WPP), the Riot Control Burning Pit (RCP), the Robins Point Demolition Ground (RPDG), the Robins Point Tower Site (RPTS), the South Beach Demolition Ground (SBDG), the South Beach Trench (SBT), and the Prototype Building (PB). The scope of this project is to conduct a remedial investigation/feasibility study (RI/FS) and ecological risk assessment to evaluate the impacts of past disposal activities at the J-Field site. Sampling for the RI will be carried out in three stages (I, II, and III) as detailed in the FSP. A phased approach will be used for the J-Field ecological risk assessment (ERA).

  19. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of the UMTRA Ground Water Project is to protect human health and the environment by meeting the proposed EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own unique set of potential impacts, could be used to implement all the alternatives except the no action alternative. Implementing a PEIS alternative means applying a ground water compliance strategy or strategies at a specific site. It is the use of a strategy or a combination of strategies that would result in site-specific impacts

  20. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  1. 6430.1A Compliance Matrix for 241-SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    ERHART, M.F.

    2001-01-01

    The purpose of this document is to record the design attributes of the RAPID Mitigation System which fulfill the pertinent requirements specified in DOE Order 6430.1A-General Design Criteria. Those pertinent Order requirements which are not met by the project at the time of the release of this document are recorded and noted as open items in Section 4.0-Conclusions

  2. Grand challenge problems in environmental modeling and remediation: Groundwater contaminant transport. Final project report 1998

    International Nuclear Information System (INIS)

    1998-04-01

    The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997

  3. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Directory of Open Access Journals (Sweden)

    Dimitri R. Dounas-Frazer

    2017-12-01

    Full Text Available We investigate students’ sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students’ interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  4. Student ownership of projects in an upper-division optics laboratory course: A multiple case study of successful experiences

    Science.gov (United States)

    Dounas-Frazer, Dimitri R.; Stanley, Jacob T.; Lewandowski, H. J.

    2017-12-01

    We investigate students' sense of ownership of multiweek final projects in an upper-division optics lab course. Using a multiple case study approach, we describe three student projects in detail. Within-case analyses focused on identifying key issues in each project, and constructing chronological descriptions of those events. Cross-case analysis focused on identifying emergent themes with respect to five dimensions of project ownership: student agency, instructor mentorship, peer collaboration, interest and value, and affective responses. Our within- and cross-case analyses yielded three major findings. First, coupling division of labor with collective brainstorming can help balance student agency, instructor mentorship, and peer collaboration. Second, students' interest in the project and perceptions of its value can increase over time; initial student interest in the project topic is not a necessary condition for student ownership of the project. Third, student ownership is characterized by a wide range of emotions that fluctuate as students alternate between extended periods of struggle and moments of success while working on their projects. These findings not only extend the literature on student ownership into a new educational domain—namely, upper-division physics labs—they also have concrete implications for the design of experimental physics projects in courses for which student ownership is a desired learning outcome. We describe the course and projects in sufficient detail that others can adapt our results to their particular contexts.

  5. Effects of the proposed EPA groundwater standards on the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Titus, F.B.

    1988-01-01

    Potential groundwater contamination beneath the 24 tailings piles that are to be stabilized under the UMTRA Project was intended in early project plans to be minimized by placing disposal piles over thick stratigraphic sequences of tight (minimally permeable) formations, and by designing covers that contained low permeability soil/clay infiltration barriers. The court-ordered revision of the UMTRA groundwater standards by EPA (proposed standards of September 1987) include very low Maximum Concentration Limits (MCLs), which are based mostly on Primary Drinking Water Standards. EPA also mandates that the designs should control radioactivity and hazardous constituents...for up to one thousand years, to the extends reasonably achievable, and, in any case, for at least two hundred years.... In order to accommodate this stipulation, transport modeling of water and contaminants in both the vadose and saturated zones beneath the piles is run until steady state conditions are reached. The early decision to locate stabilized piles over tight formations now exacerbates the problem of complying with the standards, since the contaminants percolate to groundwater that moves only slowly through strata having low permeabilities. Innovative solutions have been evaluated that are aimed at further minimizing long-term infiltration, geochemically fixing contaminants in place before they reach groundwater, or otherwise minimizing contaminant flux

  6. Environmental summary of the F- and H-area seepage basins groundwater remediation project, Savannah River site

    International Nuclear Information System (INIS)

    Friday, G.P.

    1997-01-01

    This report summarizes the results of nearly 70 investigations of the baseline environment, describes the remedial action, and identifies constituents of interest that pose potential risk to human health and the environment. It also proposes an approach for evaluating the effectiveness of the remedial action

  7. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  8. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17-21, 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team's findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ''US Department of Energy Voluntary Protection Program, Part 1: Program Elements'' to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA's VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status

  9. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are

  10. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    International Nuclear Information System (INIS)

    1996-01-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings ' ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings.' Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  11. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  12. Multiweek cell culture project for use in upper-level biology laboratories.

    Science.gov (United States)

    Marion, Rebecca E; Gardner, Grant E; Parks, Lisa D

    2012-06-01

    This article describes a laboratory protocol for a multiweek project piloted in a new upper-level biology laboratory (BIO 426) using cell culture techniques. Human embryonic kidney-293 cells were used, and several culture media and supplements were identified for students to design their own experiments. Treatments included amino acids, EGF, caffeine, epinephrine, heavy metals, and FBS. Students researched primary literature to determine their experimental variables, made their own solutions, and treated their cells over a period of 2 wk. Before this, a sterile technique laboratory was developed to teach students how to work with the cells and minimize contamination. Students designed their experiments, mixed their solutions, seeded their cells, and treated them with their control and experimental media. Students had the choice of manipulating a number of variables, including incubation times, exposure to treatment media, and temperature. At the end of the experiment, students observed the effects of their treatment, harvested and dyed their cells, counted relative cell numbers in control and treatment flasks, and determined the ratio of living to dead cells using a hemocytometer. At the conclusion of the experiment, students presented their findings in a poster presentation. This laboratory can be expanded or adapted to include additional cell lines and treatments. The ability to design and implement their own experiments has been shown to increase student engagement in the biology-related laboratory activities as well as develop the critical thinking skills needed for independent research.

  13. Cleanup protocols when encountering thorium-230 at U.S. DOE Uranium Mill Tailings Remedial Action (UMTRA) Project sites

    International Nuclear Information System (INIS)

    Miller, M.L.; Hylko, J.M.; Cornish, R.E.

    1995-01-01

    The passage of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, established the regulatory framework, under which the US EPA charged with developing standards for the cleanup and disposal of tailings at 24 designated inactive uranium processing sites located in 10 states. 40 CFR 192.12 requires that the concentration of Ra-226 in land averaged over any area of 100 square meters shall not exceed the background level by more than 5 pCi/g, averaged over the first 15 cm of soil below the surface, 15 pCi/g, averaged over 15-cm-thick layers of soils more than 15 cm below the surface. However, Th-230 is not specifically addressed by the EPA in 40 CFR 192.12, which naturally decays with a half-life of 77,000 years to form Ra-226. Consequently, the cleanup of the initial Ra-226 contamination according to the standards will not necessarily mitigate against the eventual ingrowth of residual Ra-226 with time, due to the radioactive decay of residual Th-230. Therefore, to direct the excavation of residual Th-230, four generic protocols are being used at Uranium Mill Tailings Remedial Action (UMTRA) Project sites, as follows: Determining the allowable remaining concentration of Th-230 in surface and subsurface soils; Encountering Th-230 contamination in the unsaturated subsurface soil; Encountering Th-230 contamination in the saturated zone; and Verification sampling. The four generic protocols, developed in conjunction with the supplemental standards provision, ensure protection of the general public by reducing exposures to levels that are As Low As Reasonably Achievable, while considering practical measures necessary to excavate Th-230 under conditions encountered at the UMTRA Project site

  14. Sampling and analysis plan for the 100-D Ponds voluntary remediation project

    International Nuclear Information System (INIS)

    1996-08-01

    This Sampling and Analysis Plan (SAP) describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds Resource Conservation and Recovery Act (RCRA) treatment, storage, and/or disposal (TSD) unit. This SAP includes the Field Sampling Plan (FSP) presented in Section 2.0, and the Quality Assurance Project Plan (QAPjP) described in Section 3.0. The FSP defines the sampling and analytical methodologies to be performed, and the QAPjP provides or includes information on the requirements for precision, accuracy, representativeness, comparability, and completeness of the analytical data. This sampling and analysis plan was developed using the Environmental Protection Agency's Seven-Step Data Quality Objectives (DQO) Guidance (EPA, 1994). The purpose of the DQO meetings was (1) to identify the contaminants of concern and their cleanup levels under the Washington State Model Toxics Control Act (MTCA, WAC-173-340) Method B, and (2) to determine the number and locations of samples necessary to verify that the 100-D Ponds meet the cleanup criteria. The data collected will be used to support RCRA closure of this TSD unit

  15. Final report on 3-D experiment project air-water upper plenum experiments

    International Nuclear Information System (INIS)

    Jacoby, J.K.; Mohr, C.M.

    1978-11-01

    The results are presented from upper plenum air-water reflood behavior testing performed as part of the program to investigate three-dimensional aspects of PWR LOCA research. Tests described were performed at near ambient temperature and pressure in a plexiglass vessel which included the important features of the upper core and upper plenum regions corresponding to a single fuel bundle in both Westinghouse Electric Corporation (Trojan) and Kraftwerk Union (KKU) PWR designs. The data included observed two-phase flow characteristics, particularly with regard to countercurrent flow, and cinematography of the characteristic upper plenum flow patterns

  16. The Positive Impacts Of American Reinvestment And Recovery Act (ARRA) Funding To The Waste Management Program On Hanford's Plateau Remediation Project

    International Nuclear Information System (INIS)

    Blackford, L.T.

    2010-01-01

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

  17. 75 FR 52360 - Upper Truckee River Restoration and Golf Course Reconfiguration Project, El Dorado County, CA

    Science.gov (United States)

    2010-08-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Upper Truckee River Restoration and Golf Course... and comment the draft EIR/EIS for the Upper Truckee River Restoration and Golf Course Reconfiguration... include continuing existing golf course use, removal of the entire Lake Tahoe Golf Course, or...

  18. Promoting the management of acute upper gastrointestinal bleeds among junior doctors: a quality improvement project.

    Science.gov (United States)

    Saunsbury, Emma; Allison, Emma; Colleypriest, Ben

    2015-01-01

    Though they are knowledgeable, foundation year one (FY1) doctors can lack skills and confidence in acute situations due to inexperience. This was witnessed when a new FY1 on call attended an acute upper gastrointestinal bleed (UGIB), a common emergency with a 10% in hospital mortality rate. We aimed to improve FY1s' ability to manage these critical patients through simulation based teaching, before and after the introduction of an algorithm summarising current guidelines. After assessing the FY1s' perceived level of confidence in managing UGIBs, they individually attended a simulation session which evaluated specific aspects of their assessment and management plans. Immediate debriefing and subsequent teaching sessions reinforced learning points, with an algorithm instituted as an aide mémoire to improve efficiency. A repeat simulation session assessed improvements in both subjective confidence and objective management targets. All FY1s expressed improved confidence in managing patients with UGIBs. There were improvements across the board in their assessment and management, notably: verbalisation of concern for hypotension increased to 100% (from 60%), two points of intravenous access requested in 100% of cases (from 53%), and a 76 second reduction in time to call for senior support. Collectively, these individual aspects led to improved patient care. Effective management of acute patients is best learnt through exposure, and simulation based teaching provides a safe but powerful modality to aid transition from textbook theory to ward situations. Algorithms can streamline care and hasten the stabilisation of patients. This project reinforces generic competencies that FY1s can translate to their management of not only UGIBs, but many acute presentations, providing a convincing argument for broader simulation use in FY1 teaching.

  19. 1992 Colorado Economic Impact Study for the US Department of Energy and Colorado Department of Health Uranium Mill Tailings Remedial Action (UMTRA) Project

    International Nuclear Information System (INIS)

    1991-01-01

    The findings of the 1992 Colorado Economic Impact Study (CEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Project are outlined below. All dollar amounts used in the study are in year-of-expenditure dollars. The total funding requirement for the State of Colorado for the UMTRA Project is estimated to be $66.8 million, or 10 percent of the remedial action costs for the UMTRA Project in Colorado. The UMTRA Project will generate $487.5 million in gross labor income in Colorado between 1983 and 1996. This includes $54.4 million in state and local tax revenues and $41.2 million in federal individual income tax revenues. The net economic benefit of the UMTRA Project to Colorado is $355.1 million. For every dollar the State of Colorado invests in the UMTRA Project, it will realize $5.32 in gross labor income. The employment impact to the Western Slope region is significant. The UMTRA Project will create a total employment impact of 13,749 fulltime equivalents (FTES) spread over. a period of 13 years in seven site areas. Nearly 100 percent of the labor will be drawn from the local communities. The State of Colorado's Western Slope is anticipated to be minimally impacted by the phaseout of the UMTRA Project. Unlike industries that shut down operations without warning, the UMTRA Project workers, local government, and businesses know the schedule for completion and can consider and prepare for the impact of UMTRA Project conclusion. Further, because the majority of the work force is local, there has not been a significant investment in each community's infrastructure. Any small increases in the infrastructure will not be abandoned at the end of the UMTRA Project due to a marked increase in migration out of the local community

  20. Technical safety requirements for the South Tank Farm remediation project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Platfoot, J.H.

    1999-01-01

    The South Tank Farm (STF) is a series of six, 170,000-gal underground, domed storage tanks that were placed into service in 1943. The tanks were constructed of a concrete mixture known as gunite. They were used as a portion of the Liquid LOW-LEVEL WASTE (LLW) System for the collection, neutralization, storage, and transfer of the aqueous portion of the radioactive and/or hazardous chemical wastes produced as part of normal facility operations at Oak Ridge National Laboratory (ORNL). Although the last of the tanks was taken out of service in 1986, they have been shown by structural analysis to continue to be structurally sound. An attempt was made in 1983 to empty the tanks; however, removal of all the sludge from the tanks was not possible with the equipment and schedule available. Since removal of the liquid waste in 1983, liquid continues to accumulate within the tanks. The in-leakage is believed to be the result of groundwater dripping into the tanks around penetrations in the domes. The tanks are currently being maintained under a Surveillance and Maintenance Program, which includes activities such as level monitoring, vegetation control, High Efficiency Particulate Air filter leakage requirement testing/replacement, sign erection/repair, pump-out of excess liquids, and instrument calibration/maintenance. A technique known as confined sluicing, which uses a high-pressure, low-volume water jet integrated with a jet pump, will be used to remove the sludge. The Technical Safety Requirements (TSRs) are those operational requirements that specify the operating limits and surveillance requirements, the basis thereof, safety boundaries, and the management of administrative controls necessary to ensure the safe operation of the STF remediation project. Effective implementation of TSRs will limit to acceptable levels the risks to the public and workers from uncontrolled releases of radioactive or other hazardous material

  1. Remedial investigation work plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-03-01

    More than 200 contaminated sites created by past waste management practices have been identified at the Y-12 Plant. Many of the sites have been grouped into operable units based on priority and on investigative and remediation requirements. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions

  2. An outline of a model-based expert system to identify optimal remedial strategies for restoring contaminated aquatic ecosystems: the project MOIRA

    International Nuclear Information System (INIS)

    Appelgren, A.; Bergstrom, U.; Brittain, J.; Monte, L.

    1996-10-01

    The present report describes the fundamental principles of the research programme MOIRA (a model based computerized system for management support to Identify optimal remedial strategies for Restoring radionuclide contaminated Aquatic ecosystems and drainage areas) financed by the EC (European Community) (Contract N F14P-CT96-0036). The interventions to restore radionuclides contaminated aquatic systems may result in detrimental ecological, social and economical effects. Decision makers must carefully evaluate these impacts. The main aim of the MOIRA project is the development of an expert system based on validated models predicting the evolution of the radioactive contamination of fresh water systems following countermeasure applications and their relevant ecological, social and economical impacts. The expert system will help decision makers, that are not necessarily gifted with experience in environmental modeling, to identify optimal remedial strategies for restoring contaminated fresh water systems

  3. An outline of a model-based expert system to identify optimal remedial strategies for restoring contaminated acquatic ecosystems: The project ``moira``

    Energy Technology Data Exchange (ETDEWEB)

    Appelgren, A.; Bergstrom, U. [Studsvik Eco and AB, Nykoping (Sweden); Brittain, J. [Oslo Univ. (Norway). LFI Zoological Museum; Gallego Diaz, E. [Madrid Universidad Politecnica (Spain). Dept. de Ingenieria Nuclear; Hakanson, L. [KEMA Nuclear, Arnhem (Niger); Monte, L. [ENEA, Centro Ricerche Casaccia, Rome (Italy). Dip. Ambiente

    1996-10-01

    The present report describes the fundamental principles of the research programme MOIRA (a model based computerized system for management support to Identify optimal remedial strategies for Restoring radionuclide contaminated Aquatic ecosystems and drainage areas) financed by the EC (European Community) (Contract N F14P-CT96-0036). The interventions to restore radionuclides contaminated aquatic systems may result in detrimental ecological, social and economical effects. Decision makers must carefully evaluate these impacts. The main aim of the MOIRA project is the development of an expert system based on validated models predicting the evolution of the radioactive contamination of fresh water systems following countermeasure applications and their relevant ecological, social and economical impacts. The expert system will help decision makers, that are not necessarily gifted with experience in environmental modeling, to identify optimal remedial strategies for restoring contaminated fresh water systems.

  4. Upper-Ocean Heat Balance Processes and the Walker Circulation in CMIP5 Model Projections

    Science.gov (United States)

    Robertson, F. R.; Roberts, J. B.; Funk, C.; Lyon, B.; Ricciardulli, L.

    2012-01-01

    Considerable uncertainty remains as to the importance of mechanisms governing decadal and longer variability of the Walker Circulation, its connection to the tropical climate system, and prospects for tropical climate change in the face of anthropogenic forcing. Most contemporary climate models suggest that in response to elevated CO2 and a warmer but more stratified atmosphere, the required upward mass flux in tropical convection will diminish along with the Walker component of the tropical mean circulation as well. Alternatively, there is also evidence to suggest that the shoaling and increased vertical stratification of the thermocline in the eastern Pacific will enable a muted SST increase there-- preserving or even enhancing some of the dynamical forcing for the Walker cell flow. Over the past decade there have been observational indications of an acceleration in near-surface easterlies, a strengthened Pacific zonal SST gradient, and globally-teleconnected dislocations in precipitation. But is this evidence in support of an ocean dynamical thermostat process posited to accompany anthropogenic forcing, or just residual decadal fluctuations associated with variations in warm and cold ENSO events and other stochastic forcing? From a modeling perspective we try to make headway on this question by examining zonal variations in surface energy fluxes and dynamics governing tropical upper ocean heat content evolution in the WCRP CMIP5 model projections. There is some diversity among model simulations; for example, the CCSM4 indicates net ocean warming over the IndoPacific region while the CSIRO model concentrates separate warming responses over the central Pacific and Indian Ocean regions. The models, as with observations, demonstrate strong local coupling between variations in column water vapor, downward surface longwave radiation and SST; but the spatial patterns of changes in the sign of this relationship differ among models and, for models as a whole, with

  5. Environmental compliance plan for the Lower East Fork Poplar Creek Remedial Action Project at Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    Remedial action for Lower East Fork Poplar Creek, as defined by the Record of Decision, requires that soil contaminated with >400 ppM mercury be excavated and disposed. Based on the remediation goal, soil will be excavated from areas located at the NOAA site and the Bruner site and disposed at the Industrial Landfill V at the Y-12 Plant. Objective is to minimize the risk to human health and the environment from contaminated soil in the lower EFPC floodplain pursuant to CERCLA and the Federal Facility Agreement (DOE 1992)

  6. Caresoil: A multidisciplinar Project to characterize, remediate, monitor and evaluate the risk of contaminated soils in Madrid (Spain)

    Science.gov (United States)

    Muñoz-Martín, Alfonso; Antón, Loreto; Granja, Jose Luis; Villarroya, Fermín; Montero, Esperanza; Rodríguez, Vanesa

    2016-04-01

    Soil contamination can come from diffuse sources (air deposition, agriculture, etc.) or local sources, these last being related to anthropogenic activities that are potentially soil contaminating activities. According to data from the EU, in Spain, and particularly for the Autonomous Community of Madrid, it can be considered that heavy metals, toxic organic compounds (including Non Aqueous Phases Liquids, NAPLs) and combinations of both are the main problem of point sources of soil contamination in our community. The five aspects that will be applied in Caresoil Program (S2013/MAE-2739) in the analysis and remediation of a local soil contamination are: 1) the location of the source of contamination and characterization of soil and aquifer concerned, 2) evaluation of the dispersion of the plume, 3) application of effective remediation techniques, 4) monitoring the evolution of the contaminated soil and 5) risk analysis throughout this process. These aspects involve advanced technologies (hydrogeology, geophysics, geochemistry,...) that require new developing of knowledge, being necessary the contribution of several researching groups specialized in the fields previously cited, as they are those integrating CARESOIL Program. Actually two cases concerning hydrocarbon spills, as representative examples of soil local contamination in Madrid area, are being studied. The first is being remediated and we are monitoring this process to evaluate its effectiveness. In the second location we are defining the extent of contamination in soil and aquifer to define the most effective remediation technique.

  7. NORM remediation project of Der Ezzor Petroleum Company (DEZPC) oil fields in Der Ezzor area, Syrian Arab Republic: Determination of NORM contaminated soil volumes

    International Nuclear Information System (INIS)

    Al-Masri, M. S.; Aba, A.; Hamwi, A.; Hassan, M.

    2002-04-01

    DEZP Company has used to collect product water, scale and sludge in artificial pits. Run-off channel had been created to allow water to run-off into the desert. A radioactive contamination by NORM in DEZP oil fields (JAFRA) has occurred and quite significant area of land has been affected. As a part of the remediation project the volume of contaminated soil with NORM according to the Syrian criteria for clean up and disposal has been determined. Surface and core soil samples were collected from the contaminated areas and analyzed for 226 Ra. The results have shown that contamination has reached a depth of more than one meter in the surface water pit. The estimated contaminated soil that needs disposal according to the Syrian criteria was calculated and found to be about 3161 m 3 . Most of the contaminated soil was found to be in the surface water pit. In addition, the contamination in the mud pit and the run-off channel was rather small and could be treated on site. However, the obtained results can be used for preparation of the remediation plan where size of the disposal pit and on site treatment is defined. The plan should be submitted to the Syrian Regulatory Office for review and approval to initiation of the remediation work (author)

  8. Metadata database and data analysis software for the ground-based upper atmospheric data developed by the IUGONET project

    Science.gov (United States)

    Hayashi, H.; Tanaka, Y.; Hori, T.; Koyama, Y.; Shinbori, A.; Abe, S.; Kagitani, M.; Kouno, T.; Yoshida, D.; Ueno, S.; Kaneda, N.; Yoneda, M.; Tadokoro, H.; Motoba, T.; Umemura, N.; Iugonet Project Team

    2011-12-01

    The Inter-university Upper atmosphere Global Observation NETwork (IUGONET) is a Japanese inter-university project by the National Institute of Polar Research (NIPR), Tohoku University, Nagoya University, Kyoto University, and Kyushu University to build a database of metadata for ground-based observations of the upper atmosphere. The IUGONET institutes/universities have been collecting various types of data by radars, magnetometers, photometers, radio telescopes, helioscopes, etc. at various locations all over the world and at various altitude layers from the Earth's surface to the Sun. The metadata database will be of great help to researchers in efficiently finding and obtaining these observational data spread over the institutes/universities. This should also facilitate synthetic analysis of multi-disciplinary data, which will lead to new types of research in the upper atmosphere. The project has also been developing a software to help researchers download, visualize, and analyze the data provided from the IUGONET institutes/universities. The metadata database system is built on the platform of DSpace, which is an open source software for digital repositories. The data analysis software is written in the IDL language with the TDAS (THEMIS Data Analysis Software suite) library. These products have been just released for beta-testing.

  9. Ecotoxicity testing and environmental risk assessment of iron nanomaterials for sub-surface remediation – Recommendations from the FP7 project NanoRem

    DEFF Research Database (Denmark)

    Hjorth, Rune; Coutris, Claire; Nguyen, Nhung

    2017-01-01

    engineered Fe nanomaterials, specifically, Nano-Goethite, Trap-Ox Fe-zeolites, Carbo-Iron® and FerMEG12, developed within the European FP7 project NanoRem for sub-surface remediation towards a test battery consisting of eight ecotoxicity tests on bacteria (V. fisheri, E. coli), algae (P. subcapitata...... milled nZVI (FerMEG12), showed no toxicity in the test battery when tested in concentrations up to 100 mg/L, which is the cutoff for hazard labeling in chemicals regulation in Europe. However it should be noted that Fe nanomaterials proved challenging to test adequately due to their turbidity...

  10. CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY

    Energy Technology Data Exchange (ETDEWEB)

    BERGMAN, T. B.; STEFANSKI, L. D.; SEELEY, P. N.; ZINSLI, L. C.; CUSACK, L. J.

    2012-09-19

    THE CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY WAS CONDUCTED TO DEVELOP AN OPTIMAL SEQUENCE OF REMEDIATION ACTIVITIES IMPLEMENTING THE CERCLA DECISION ON THE CENTRAL PLATEAU. THE STUDY DEFINES A SEQUENCE OF ACTIVITIES THAT RESULT IN AN EFFECTIVE USE OF RESOURCES FROM A STRATEGIC PERSPECTIVE WHEN CONSIDERING EQUIPMENT PROCUREMENT AND STAGING, WORKFORCE MOBILIZATION/DEMOBILIZATION, WORKFORCE LEVELING, WORKFORCE SKILL-MIX, AND OTHER REMEDIATION/DISPOSITION PROJECT EXECUTION PARAMETERS.

  11. Water governance within Kenya's Upper Ewaso Ng'iro Basin: Assessing the performance of water projects

    Science.gov (United States)

    McCord, P. F.; Evans, T. P.; Dell'Angelo, J.; Gower, D.; McBride, L.; Caylor, K. K.

    2013-12-01

    Climate change processes are projected to change the availability and seasonality of streamflow with dramatic implications for irrigated agricultural systems. Within mountain environments, this alteration in water availability may be quite pronounced over a relatively short distance as upstream users with first access to river water directly impact the availability of water to downstream users. Livelihood systems that directly depend on river water for both domestic consumption and practices such as irrigated agriculture are particularly vulnerable. The Mount Kenya region is an exemplary case of a semi-arid upstream-downstream system in which water availability rapidly decreases and directly impacts the livelihoods of river water users existing across this steep environmental gradient. To effectively manage river water within these water-scarce environs, water projects have been established along the major rivers of the Mount Kenya region. These water projects are responsible for managing water within discrete sub-catchments of the region. While water projects develop rules that encourage the responsible use of water and maintenance of the project itself, the efficiency of water allocation to the projects' members remains unclear. This research analyzes water projects from five sub-catchments on the northwest slopes of Mount Kenya. It utilizes data from household surveys and water project management surveys as well as stream gauge data and flow measurements within individual water projects to assess the governance structure and performance of water projects. The performance of water projects is measured through a variety of household level metrics including: farm-level water flow and volume over time, mean and variability in maize yield, per capita crop productivity, household-level satisfaction with water availability, number of days where water volume was insufficient for irrigation, and quantity harvested compared with expected quantity harvested. We present

  12. Feasibility study report for Operable Unit 4: Fernald Environmental Management Project, Fernald, Ohio: Remedial investigation and feasibility study: Volume 3: Final report

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices F--J

  13. Site remediation: The naked truth

    International Nuclear Information System (INIS)

    Calloway, J.M.

    1991-01-01

    The objective of any company faced with an environmental site remediation project is to perform the cleanup effectively at the lowest possible cost. Today, there are a variety of techniques being applied in the remediation of sites involving soils and sludges. The most popular include: stabilization, incineration, bioremediation and off-site treatment. Dewatering may also play an integral role in a number of these approaches. Selecting the most cost-effective technique for remediation of soils and sludges can be a formidable undertaking, namely because it is often difficult to quantify certain expenses in advance of the project. In addition to providing general cost guidelines for various aspects of soil and sludge remediation, this paper will show how some significant cost factors can be affected by conditions related to specific remediation projects and the cleanup technology being applied

  14. Projected risk of population declines for native fish species in the Upper Mississippi River

    Science.gov (United States)

    Crimmins, S.M.; Boma, P.; Thogmartin, W.E.

    2015-01-01

    Conservationists are in need of objective metrics for prioritizing the management of habitats. For individual species, the threat of extinction is often used to prioritize what species are in need of conservation action. Using long-term monitoring data, we applied a Bayesian diffusion approximation to estimate quasi-extinction risk for 54 native fish species within six commercial navigation reaches along a 1350-km gradient of the upper Mississippi River system. We found a strong negative linear relationship between quasi-extinction risk and distance upstream. For some species, quasi-extinction estimates ranged from nearly zero in some reaches to one in others, suggesting substantial variability in threats facing individual river reaches. We found no evidence that species traits affected quasi-extinction risk across the entire system. Our results indicate that fishes within the upper Mississippi River system face localized threats that vary across river impact gradients. This suggests that conservation actions should be focused on local habitat scales but should also consider the additive effects on downstream conditions. We also emphasize the need for identification of proximate mechanisms behind observed and predicted population declines, as conservation actions will require mitigation of such mechanisms. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.

  15. The environmental aspects of a tidal power project in the upper reaches of the Bay Fundy

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, D.C.; Longhurst, A.R.

    1979-02-01

    A recommendation for pre-investment design studies for a tidal power development in the Cumberland Basin region of the Bay of Fundy has been made by the Bay of Fundy Tidal Power Review Board and is backed by Canadian provincial and federal governments. A brief history of regional tidal power proposals is presented, and procedures for determining the environmental impacts of the project are outlined. Possible environmental consequences of tidal power development can be hypothesized, but the existing environmental data base is sparse. Investigations are presently being expanded by university and governmental scientists, and specific impact assessment studies will be commissioned if the project is authorized to proceed. (1 map, 11 references)

  16. Alternative Remedies

    Science.gov (United States)

    ... Home › Aging & Health A to Z › Alternative Remedies Font ... medical treatment prescribed by their healthcare provider. Using this type of alternative therapy along with traditional treatments is ...

  17. Environmental Regulation of Plant Gene Expression: An Rt-qPCR Laboratory Project for an Upper-Level Undergraduate Biochemistry or Molecular Biology Course

    Science.gov (United States)

    Eickelberg, Garrett J.; Fisher, Alison J.

    2013-01-01

    We present a novel laboratory project employing "real-time" RT-qPCR to measure the effect of environment on the expression of the "FLOWERING LOCUS C" gene, a key regulator of floral timing in "Arabidopsis thaliana" plants. The project requires four 3-hr laboratory sessions and is aimed at upper-level undergraduate…

  18. Characterizing changes in the excitability of corticospinal projections to proximal muscles of the upper limb.

    Science.gov (United States)

    Carson, Richard G; Nelson, Barry D; Buick, Alison R; Carroll, Timothy J; Kennedy, Niamh C; Cann, Rachel Mac

    2013-09-01

    There has been an explosion of interest in methods of exogenous brain stimulation that induce changes in the excitability of human cerebral cortex. The expectation is that these methods may promote recovery of function following brain injury. To assess their effects on motor output, it is typical to assess the state of corticospinal projections from primary motor cortex to muscles of the hand, via electromyographic responses to transcranial magnetic stimulation. If a range of stimulation intensities is employed, the recruitment curves (RCs) obtained can, at least for intrinsic hand muscles, be fitted by a sigmoid function. To establish whether sigmoid fits provide a reliable basis upon which to characterize the input-output properties of the corticospinal pathway for muscles proximal to the hand, and to assess as an alternative the area under the (recruitment) curve (AURC). A comparison of the reliability of these measures, using RCs obtained for muscles that are frequently the targets of rehabilitation. The AURC is an extremely reliable measure of the state of corticospinal projections to hand and forearm muscles, which has both face and concurrent validity. Construct validity is demonstrated by detection of widely distributed (across muscles) changes in corticospinal excitability induced by paired associative stimulation (PAS). The parameters derived from sigmoid fits are unlikely to provide an adequate means to assess the effectiveness of therapeutic regimes. The AURC can be employed to characterize corticospinal projections to a range of muscles, and gauge the efficacy of longitudinal interventions in clinical rehabilitation. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. Genealogy Remediated

    DEFF Research Database (Denmark)

    Marselis, Randi

    2007-01-01

    Genealogical websites are becoming an increasingly popular genre on the Web. This chapter will examine how remediation is used creatively in the construction of family history. While remediation of different kinds of old memory materials is essential in genealogy, digital technology opens new...... possibilities. Genealogists use their private websites to negotiate family identity and hereby create a sense of belonging in an increasingly complex society. Digital technologies enhance the possibilities of coorporation between genealogists. Therefore, the websites are also used to present archival...

  20. The electronic Space Weather upper atmosphere (eSWua project at INGV: advancements and state of the art

    Directory of Open Access Journals (Sweden)

    V. Romano

    2008-02-01

    Full Text Available The eSWua project is based on measurements performed by all the instruments installed by the upper atmosphere physics group of the Istituto Nazionale di Geofisica e Vulcanologia, Italy and on all the related studies. The aim is the realization of a hardware-software system to standardize historical and real-time observations for different instruments.

    An interactive Web site, supported by a well organized database, can be a powerful tool for the scientific and technological community in the field of telecommunications and space weather. The most common and useful database type for our purposes is the relational one, in which data are organized in tables for petabytes data archiving and the complete flexibility in data retrieving.

    The project started in June 2005 and will last till August 2007. In the first phase the major effort has been focused on the design of hardware and database architecture. The first two databases related to the DPS4 digisonde and GISTM measurements are complete concerning populating, tests and output procedures. Details on the structure and Web tools concerning these two databases are presented, as well as the general description of the project and technical features.

  1. The electronic Space Weather upper atmosphere (eSWua project at INGV: advancements and state of the art

    Directory of Open Access Journals (Sweden)

    V. Romano

    2008-02-01

    Full Text Available The eSWua project is based on measurements performed by all the instruments installed by the upper atmosphere physics group of the Istituto Nazionale di Geofisica e Vulcanologia, Italy and on all the related studies. The aim is the realization of a hardware-software system to standardize historical and real-time observations for different instruments. An interactive Web site, supported by a well organized database, can be a powerful tool for the scientific and technological community in the field of telecommunications and space weather. The most common and useful database type for our purposes is the relational one, in which data are organized in tables for petabytes data archiving and the complete flexibility in data retrieving. The project started in June 2005 and will last till August 2007. In the first phase the major effort has been focused on the design of hardware and database architecture. The first two databases related to the DPS4 digisonde and GISTM measurements are complete concerning populating, tests and output procedures. Details on the structure and Web tools concerning these two databases are presented, as well as the general description of the project and technical features.

  2. [Manufacture of upholstered furniture and work-related upper limb musculoskeletal disorders: an industrial sector prevention project].

    Science.gov (United States)

    Di Leone, G; Carino, M; Nicoletti, S; Trani, G; Ambrosi, L

    2008-01-01

    In cooperation with the IRCCS Fondazione Maugeri and the IRCCS Fondazione Ospedale Maggiore Policlinico - EPM-CEMOC, of Milan, the Local Health Unit in Bari, Italy carried out a research project, sponsored partly by the Italian Ministry of Health, on upper limb work-related musculoskeletal disorders (UL-WMSDs) in a specific manufacturing sector, the upholstered furniture industry. This "sofa district" is widely represented with approximately 14,000 workers and 500 factories over a wide geographic area of southern Italy. Advanced technology in the manufacturing process is combined with workers performing intensive arm-hand tasks. The aim of the study included: a) assessment of exposure to repetitive strain and movements of the upper limb in a representative sample of the factories using the OCRA method, b) analysis of the annual prevalence and incidence rates, c) definition of possible improvement via ergonomic solutions in the various factories. Via a network of occupational physicians a total of more than 6000 subjects were examined over a 5-year period. Case-definition was assessed through standardized procedures. A detailed description of the manufacturing process of the upholstered furniture industry and of the characteristics of the working population is provided Exposed groups at risk were:filling preparation workers, leather-cutting operators, sewing and upholstery-assembly workers. Data collected in private companies of different size in this extensive industrial "sofa area" emphasize the importance of prevention through adequate ergonomic solutions and the need to improve training programmes covering the whole area.

  3. Radiological Survey Results for Areas A1 North, A5A, A6, and B2 at the Molycorp Washington Remediation Project, Washington, Pennsylvania

    International Nuclear Information System (INIS)

    W.C. Adams

    2007-01-01

    Perform radiological surveys of the Molycorp Washington Remediation Project (MWRP) facility in Washington, Pennsylvania. The U.S. Nuclear Regulatory Commission (NRC) requested the Oak Ridge Institute for Science and Education (ORISE) to provide limited training pertaining to ORISE radiological soil scanning and sampling procedures to the Pennsylvania Department of Environmental Protection (PADEP) personnel. In addition, the NRC also requested that ORISE perform radiological surveys of the Molycorp Washington Remediation Project (MWRP) facility in Washington, Pennsylvania (Figure 1). ORISE has and will continue to interface with PADEP personnel in a joint effort to perform confirmatory radiological surveys, consisting of gamma scans and soil sampling, at the MWRP facility. PADEP personnel will continue to submit soil samples that they collect to ORISE for analyses. PADEP sample results, along with ORISE results, will be provided to the NRC and PADEP so that decisions regarding the radiological status of the surveyed areas can be determined. ORISE performed radiological surveys during the period of November 28 and 29, 2006. The survey unit (SU) available for ORISE radiological survey activities was Area A1 North. The MWRP final status survey (FSS) results for Area A1 North were reviewed prior to these survey activities. Prior to ORISE's survey activities, PADEP personnel had performed radiological surveys and collected soil samples from SU Areas A5A and A6. These samples were provided to ORISE for analyses while on site. After the ORISE radiological surveys, PADEP personnel collected soil samples from SU Areas A2 and B2 and these samples were shipped to ORISE for analyses in January 2007. Figure 2 depicts the MWRP Areas A through D; ORISE and PADEP personnel performed survey activities in portions of Areas A and B. For interlaboratory comparison analyses with MWRP's site contractor, Malcolm Pirnie (MP), ORISE requested soil samples from the Area A1 soil stockpiles

  4. Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

    Energy Technology Data Exchange (ETDEWEB)

    Albrecht, Linda [Alliant Corporation (United States); Wilkerson, Laura; Skinner, Ralph [US DOE-ORO EM (United States); Birchfield, Joseph W. III [Link Technologies (United States)

    2012-07-01

    The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs

  5. Examples of Department of Energy Successes for Remediation of Contaminated Groundwater: Permeable Reactive Barrier and Dynamic Underground Stripping ASTD Projects

    International Nuclear Information System (INIS)

    Purdy, C.; Gerdes, K.; Aljayoushi, J.; Kaback, D.; Ivory, T.

    2002-01-01

    Since 1998, the Department of Energy's (DOE) Office of Environmental Management has funded the Accelerated Site Technology Deployment (ASTD) Program to expedite deployment of alternative technologies that can save time and money for the environmental cleanup at DOE sites across the nation. The ASTD program has accelerated more than one hundred deployments of new technologies under 76 projects that focus on a broad spectrum of EM problems. More than 25 environmental restoration projects have been initiated to solve the following types of problems: characterization of the subsurface using chemical, radiological, geophysical, and statistical methods; treatment of groundwater contaminated with DNAPLs, metals, or radionuclides; and other projects such as landfill covers, purge water management systems, and treatment of explosives-contaminated soils. One of the major goals of the ASTD Program is to deploy a new technology or process at multiple DOE sites. ASTD projects are encouraged to identify subsequent deployments at other sites. Some of the projects that have successfully deployed technologies at multiple sites focusing on cleanup of contaminated groundwater include: Permeable Reactive Barriers (Monticello, Rocky Flats, and Kansas City), treating uranium and organics in groundwater; and Dynamic Underground Stripping (Portsmouth, and Savannah River), thermally treating DNAPL source zones. Each year more and more new technologies and approaches are being used at DOE sites due to the ASTD program. DOE sites are sharing their successes and communicating lessons learned so that the new technologies can replace the baseline or standard approaches at DOE sites, thus expediting cleanup and saving money

  6. Use of GIS at treatment of risk analysis of the project Remediation of uranium liabilities in Slovakia

    International Nuclear Information System (INIS)

    Grand, T.; Daniel, S.; Thorne, M.C.; Baker, A.C.

    2000-01-01

    The aim of this paper was to show of use of the geographic information system (GIS) at solving of the projects with evaluation of influence of mining on the environment. This work is consequent with the PHARE project on the territory of Slovakia in 1998-1999 in the region of Novoveska Huta. The main aim of the project was to evaluate of effectiveness of the re-cultivation measures in the space of former uranium deposits, localised in adjacent around of Novoveska Huta and their present influence on the environment. Constitution of the space oriented database in GIS enable identification of sources, receptors and migration ways as well as obtaining of introductory data for quantification of ecologically weight in the frame of EIA and MUAU methods.The possibilities of use of GIS at the quantification and evaluation of influence of mining on the environment was showed

  7. Surface-water-quality assessment of the upper Illinois River basin in Illinois, Indiana, and Wisconsin; project description

    Science.gov (United States)

    Mades, D.M.

    1987-01-01

    In 1986, the U.S. Geological Survey began a National Water-Quality Assessment program to (1) provide nationally consistent descriptions of the current status of water quality for a large, diverse, and geographically distributed part of the Nation's surface- and ground-water resources; (2) define, where possible, trends in water quality; and (3) identify and describe the relations of both status and trends in water quality to natural factors and the history of land use and land- and waste-management activities. The program is presently in a pilot phase that will test and modify, as necessary, concepts and approaches in preparation for possible full implementation of the program in the future. The upper Illinois River basin is one of four basins selected to test the concepts and approaches of the surface-water-quality element of the national program. The basin drains 10,949 square miles of Illinois, Indiana, and Wisconsin. Three principal tributaries are the Kankakee and Des Plaines Rivers that join to form the Illinois River and the Fox River. Land use is predominantly agricultural; about 75 percent of the basin is cultivated primarily for production of corn and soybeans. About 13 percent of the basin is urban area, most of which is located in the Chicago metropolitan area. The population of the basin is about 7 million. About 6 million people live in the Des Plaines River basin. Many water-quality issues in the upper Illinois River basin are related to sediment, nutrients, potentially toxic inorganic and organic constituents, and to water-management practices. Occurrence of sediment and the chemical constituents in the rivers and lakes within the basin has the potential to adversely affect the water's suitability for aquatic life, recreation, or, through the consumption of fish, human health. The upper Illinois River basin project consists of five major activities. The first activity--analysis of existing information and preparation of a report that describes

  8. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    International Nuclear Information System (INIS)

    1993-07-01

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan

  9. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    International Nuclear Information System (INIS)

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho

  10. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  11. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts

  12. Arsenic and Uranium Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Upper Bodfish in Lake Isabella, CA -Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the performance evaluation of an arsenic (As) and uranium (U) removal technology demonstrated at Upper Bodfish in Lake Isabella, CA. The objectives of the project are to evaluate: (1) the effecti...

  13. Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge

  14. Preliminary final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternative systems for conducting the ground water program. One of these systems is the proposed action. These alternatives do not address site-specific ground water compliance strategies, because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS presents multiple ground water compliance strategies, each with its own set of potential impacts, that could be used to implement all the alternatives presented in the PEIS except the no action alternative. The no action alternative must be considered by law. It consists of taking no action to meet EPA standards. Implementing all PEIS alternatives (except no action) means applying a ground water compliance strategy or a combination of strategies that would result in site-specific impacts

  15. Development of the chemical stabilization and solidification process for the treatment of radioactive raffinate sludges at the DOE Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    Cole, P.M.; Kakaria, V.; Enger, J.

    1996-01-01

    Chemical Solidification and Stabilization (CSS) is the mixing of chemical reagents with waste to solidify and chemically stabilize the contaminated material. The resulting product is resistant to leaching of certain contaminants. CSS treatment using Class C fly ash and Portland cement was chosen as the most feasible method for treatment of the chemically and radioactively contaminated sludge (raffinate) contained in raffinate pits on the Weldon Spring Site Remedial Action Project (WSSRAP) located outside of St. Louis, Missouri. Due to the uniqueness of the material, substantial bench-scale testing was performed on the raffinate to better understand its properties. Similarly, due to mixed results in the application of CSS treatment to radioactive materials, a pilot-scale testing facility was built to verify bench testing results and to establish and quantify design parameters for the full-scale CSS production facility. This paper discusses the development of the pilot-scale testing facility, the testing plan, and the results of the testing activities. Particular attention has been given to the applicability of the CSS treatment method and to the value of pilot-scale testing

  16. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  17. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  18. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    International Nuclear Information System (INIS)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy's (DOE's) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is ∼ 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends ∼1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of ∼1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top

  19. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is {approximately} 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends {approximately}1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of {approximately}1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top.

  20. Preliminary Study of the Effect of the Proposed Long Lake Valley Project Operation on the Transport of Larval Suckers in Upper Klamath Lake, Oregon

    Science.gov (United States)

    Wood, Tamara M.

    2009-01-01

    A hydrodynamic model of Upper Klamath and Agency Lakes, Oregon, was used to explore the effects of the operation of proposed offstream storage at Long Lake Valley on transport of larval suckers through the Upper Klamath and Agency Lakes system during May and June, when larval fish leave spawning sites in the Williamson River and springs along the eastern shoreline and become entrained in lake currents. A range in hydrologic conditions was considered, including historically high and low outflows and inflows, lake elevations, and the operation of pumps between Upper Klamath Lake and storage in Long Lake Valley. Two wind-forcing scenarios were considered: one dominated by moderate prevailing winds and another dominated by a strong reversal of winds from the prevailing direction. On the basis of 24 model simulations that used all combinations of hydrology and wind forcing, as well as With Project and No Action scenarios, it was determined that the biggest effect of project operations on larval transport was the result of alterations in project management of the elevation in Upper Klamath Lake and the outflow at the Link River and A Canal, rather than the result of pumping operations. This was because, during the spring time period of interest, the amount of water pumped between Upper Klamath Lake and Long Lake Valley was generally small. The dominant effect was that an increase in lake elevation would result in more larvae in the Williamson River delta and in Agency Lake, an effect that was enhanced under conditions of wind reversal. A decrease in lake elevation accompanied by an increase in the outflow at the Link River had the opposite effect on larval concentration and residence time.

  1. 3D Groundwater flow model at the Upper Rhine Graben scale to delineate preferential target areas for geothermal projects

    Science.gov (United States)

    Armandine Les Landes, Antoine; Guillon, Théophile; Peter-Borie, Mariane; Rachez, Xavier

    2017-04-01

    Any deep unconventional geothermal project remains risky because of the uncertainty regarding the presence of the geothermal resource at depth and the drilling costs increasing accordingly. That's why this resource must be located as precisely as possible to increase the chances of successful projects and their economic viability. To minimize the risk, as much information as possible should be gathered prior to any drilling. Usually, the position of the exploration wells of geothermal energy systems is chosen based on structural geology observations, geophysics measurements and geochemical analyses. Confronting these observations to results from additional disciplines should bring more objectivity in locating the region to explore and where to implant the geothermal system. The Upper Rhine Graben (URG) is a tectonically active rift system that corresponds to one branch of the European Cenozoic Rift System where the basin hosts a significant potential for geothermal energy. The large fault network inherited from a complex tectonic history and settled under the sedimentary deposits hosts fluid circulation patterns. Geothermal anomalies are strongly influenced by fluid circulations within permeable structures such as fault zones. In order to better predict the location of the geothermal resource, it is necessary to understand how it is influenced by heat transport mechanisms such as groundwater flow. The understanding of fluid circulation in hot fractured media at large scale can help in the identification of preferential zones at a finer scale where additional exploration can be carried out. Numerical simulations is a useful tool to deal with the issue of fluid circulations through large fault networks that enable the uplift of deep and hot fluids. Therefore, we build a numerical model to study groundwater flow at the URG scale (150 x 130km), which aims to delineate preferential zones. The numerical model is based on a hybrid method using a Discrete Fracture Network

  2. Department of Energy Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    Franco, P.J.

    1989-01-01

    This paper discusses the hazardous waste remedial actions program (HAZWRAP) which manages approximately 200 hazardous waste projects. These projects include preliminary assessments, site inspections, and remedial investigation/feasibility studies. The author describes the procedures HAZWRAP follows to ensure quality. The discussion covers the quality assurance aspects of project management, project planning, site characterization, document control and technical teamwork

  3. CENTRAL PLATEAU REMEDIATION

    International Nuclear Information System (INIS)

    ROMINE, L.D.

    2006-01-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress

  4. Uncrossed cortico-muscular projections in humans are abundant to facial muscles of the upper and lower face, but may differ between sexes.

    Science.gov (United States)

    Fischer, Urs; Hess, Christian W; Rösler, Kai M

    2005-01-01

    It is a popular concept in clinical neurology that muscles of the lower face receive predominantly crossed cortico-bulbar motor input, whereas muscles of the upper face receive additional ipsilateral, uncrossed input. To test this notion, we used focal transcranial magnetic brain stimulation to quantify crossed and uncrossed cortico-muscular projections to 6 different facial muscles (right and left Mm. frontalis, nasalis, and orbicularis oris) in 36 healthy right-handed volunteers (15 men, 21 women, mean age 25 years). Uncrossed input was present in 78% to 92% of the 6 examined muscles. The mean uncrossed: crossed response amplitude ratios were 0.74/0.65 in right/left frontalis, 0.73/0.59 in nasalis, and 0.54/0.71 in orbicularis oris; ANOVA p>0.05). Judged by the sizes of motor evoked potentials, the cortical representation of the 3 muscles was similar. The amount of uncrossed projections was different between men and women, since men had stronger left-to-left projections and women stronger right-to-right projections. We conclude that the amount of uncrossed pyramidal projections is not different for muscles of the upper from those of the lower face. The clinical observation that frontal muscles are often spared in central facial palsies must, therefore, be explained differently. Moreover, gender specific lateralization phenomena may not only be present for higher level behavioural functions, but may also affect simple systems on a lower level of motor hierarchy.

  5. Environmental regulation of plant gene expression: an RT-qPCR laboratory project for an upper-level undergraduate biochemistry or molecular biology course.

    Science.gov (United States)

    Eickelberg, Garrett J; Fisher, Alison J

    2013-01-01

    We present a novel laboratory project employing "real-time" RT-qPCR to measure the effect of environment on the expression of the FLOWERING LOCUS C gene, a key regulator of floral timing in Arabidopsis thaliana plants. The project requires four 3-hr laboratory sessions and is aimed at upper-level undergraduate students in biochemistry or molecular biology courses. The project provides students with hands-on experience with RT-qPCR, the current "gold standard" for gene expression analysis, including detailed data analysis using the common 2-ΔΔCT method. Moreover, it provides a convenient starting point for many inquiry-driven projects addressing diverse questions concerning ecological biochemistry, naturally occurring genetic variation, developmental biology, and the regulation of gene expression in nature. Copyright © 2013 Wiley Periodicals, Inc.

  6. The benefits from environmental remediation

    International Nuclear Information System (INIS)

    Falck, W.E.

    2002-01-01

    Environmental remediation projects inevitably take place against a backdrop of overall social goals and values. These goals can include, for example, full employment, preservation of the cultural, economic and archaeological resources, traditional patterns of land use, spiritual values, quality of life factors, biological diversity, environmental and socio-economic sustainability, protection of public health. Different countries will have different priorities, linked to the overall set of societal goals and the availability of resources, including funding, man-power and skills. These issues are embedded within both a national and local socio-cultural context, and will shape the way in which the remediation process is structured in any one country. The context will shape both the overall objectives of a remediation activity within the framework of competing societal goals, as well as generate constraints on the decision making process. Hence, the overall benefit of a remediation project is determined by its overall efficiency and effectiveness within the given legal, institutional, and governance framework, under the prevailing socio-economic boundary conditions, and balancing technology performance and risk reduction with fixed or limited budgetary resources, and is not simply the result of the technical remediation operation itself. (author)

  7. Land Conversion, Social Impacts, and Legal Remedies ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Land Conversion, Social Impacts, and Legal Remedies: Understanding the Role of Community Paralegals in Addressing Impacts of Land Use Change in Asia. This project addresses the ... Pays d' institution. United States. Site internet.

  8. Nanotechnology for Site Remediation: Fact Sheet

    Science.gov (United States)

    This fact sheet presents a snapshot of nanotechnology and its current uses in remediation. It presents information to help site project managers understand the potential applications of this group of technologies at their sites.

  9. Green Remediation Best Management Practices: Mining Sites

    Science.gov (United States)

    This fact sheet describes best management practices (BMPs) that can be used to reduce the environmental footprint of cleanup activities associated with common project components, cleanup phases, and implementation of remediation technologies.

  10. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan

  11. Drama, dissensus, remediation and a fluttering butterfly

    DEFF Research Database (Denmark)

    Kusk, Hanne

    2017-01-01

    Why is it important to pay attention to democracy and polyphony when working with remediation in a multimodal drama project in introductory schooling? This question is elucidated and investigated in this article on the basis of a drama project case study conducted at Hundborg Friskole. The study...... is analysed on the basis of the concepts of remediation (Bolter and Grusin 1999; Christoffersen 2009), dissensus (Biesta 2013; Rancière 2013), dialogue and polyphony (Dysthe, Bernhardt and Esbjørn 2012). The examples in the investigation show how dialogue, polyphony and dissensus influence the art......-based process of remediation, and how this impacts children’s democratic education....

  12. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  13. Biosol Project: development of a new technology for the treatment of soils contaminated with hydrocarbons. bio-remediation by means of the addition of a biomass material (part one)

    International Nuclear Information System (INIS)

    2005-01-01

    The general mission of the project is to contribute to the development of new technologies based on the bio-remediation of soils contaminated with hydrocarbons. It is pretended to develop a bio-remediation technology based on the use 'on site' of a biomass material with absorbent properties that allows to reduce time and costs of treatment of contaminated soils by hydrocarbons in comparison with other current technologies. The biomass must be biodegradable and to act as a bio-stimulator of the endogenous microbial population, which is the responsible of the degradation of the pollutants contained in the soil. Another objective to achieve is that the new technology has to be able to decontaminate soils over the maximum thresholds of concentration reached by similar technologies of bio-remediation (50.000 ppm), in order to obtain that the technique could be competitive in comparison with other techniques more conventional based on chemical or physical treatments, and more aggressive from an ecological point of view (for example: chemical oxidation, thermal desorption). The amount and quality of published scientific works also demonstrate that still there are many points to investigate until understanding perfectly how the microorganisms interact with the different phases and compounds that conforms the porous matrix of the soil. In this sense IAP emphasizes the necessity to have a previous study of characterization for any contaminated soil that it wants to be treated by means of technologies based on the bio-remediation. In a similar line, it emphasizes the studies about bio-remediation presented in the 8. Consoil (May of 2003). The works presented in this forum put in evidence the necessity of arrange pilot experiences of application that allow to advance in the development of new technologies applicable to similar scales to the real ones. Also the bio-remediation based on the bio-stimulation of the endogenous microbial populations by means of the addition of

  14. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies

  15. Assessing sustainable remediation frameworks using sustainability principles.

    Science.gov (United States)

    Ridsdale, D Reanne; Noble, Bram F

    2016-12-15

    The remediation industry has grown exponentially in recent decades. International organizations of practitioners and remediation experts have developed several frameworks for integrating sustainability into remediation projects; however, there has been limited attention to how sustainability is approached and operationalized in sustainable remediation frameworks and practices - or whether sustainability plays any meaningful role at all in sustainable remediation. This paper examines how sustainability is represented in remediation frameworks and the guidance provided for practical application. Seven broad sustainability principles and review criteria are proposed and applied to a sample of six international remediation frameworks. Not all review criteria were equally satisfied and none of the frameworks fully met all criteria; however, the best performing frameworks were those identified as sustainability remediation frameworks. Intra-generational equity was addressed by all frameworks. Integrating social, economic and biophysical components beyond triple-bottom-line indicators was explicitly addressed only by the sustainable remediation frameworks. No frameworks provided principle- or rule-based guidance for dealing with trade-offs in sustainability decisions. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  17. Formerly Utilized MED/AEC Sites Remedial Action Program. Project management plan for the decontamination of Jones Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, K.F.; Smith, W.H.; Wynveen, R.A.

    1984-01-01

    The Department of Energy (DOE) has in place a plan for the decontamination and decommissioning of contaminated sites that had been formerly utilized by the Manhattan Engineering District (MED) and/or the Atomic Energy Commission. This plan is referred to as the Formerly Utilized Sites Remedial Action Program (FUSRAP). Among these sites are Jones Laboratory, Ryerson Physical Laboratory and Eckhart Hall of The University of Chicago at Chicago, Illinois. This document represents the Project Management Plan for the decontamination of these facilities. 13 references, 3 figures, 1 table.

  18. Formerly Utilized MED/AEC Sites Remedial Action Program. Project management plan for the decontamination of Jones Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois

    International Nuclear Information System (INIS)

    Flynn, K.F.; Smith, W.H.; Wynveen, R.A.

    1984-01-01

    The Department of Energy (DOE) has in place a plan for the decontamination and decommissioning of contaminated sites that had been formerly utilized by the Manhattan Engineering District (MED) and/or the Atomic Energy Commission. This plan is referred to as the Formerly Utilized Sites Remedial Action Program (FUSRAP). Among these sites are Jones Laboratory, Ryerson Physical Laboratory and Eckhart Hall of The University of Chicago at Chicago, Illinois. This document represents the Project Management Plan for the decontamination of these facilities. 13 references, 3 figures, 1 table

  19. Groundwater remediation in the Straz leaching operation

    International Nuclear Information System (INIS)

    Novak, J.

    2001-01-01

    The locality affected by consequences of the chemical mining of the uranium during underground leaching 'in situ' is found in the area of the Czech Republic in the northeastern part of the Ceska Lipa district. In the contribution the complex groundwater remediation project is discussed. First, the risks of the current state are expressed. Then the alternatives of remediation of the both Cenomanian and Turonian aquifers are presented. Evaluation of the remediation alternatives with the view to the time-consumption, economy, ecology and the elimination of unacceptable risks for the population and environment is done. Finally, the present progress of remediation and the conception of remediation of chemical mining on deposit of Straz pod Ralskem are presented. (orig.)

  20. Remediation of spent block in Uvanas deposit

    International Nuclear Information System (INIS)

    Nurgaziev, M.A.; Iskakov, M.M.

    2012-01-01

    In 2007 by 'Kazatomprom' and 'Mining company' board decision, the branch of 'Mining company', 'Steppe ore management body' is reorganized in structure subdivision, the basic activity of which is organization and carrying out remediation works on spent blocks of PSV uranium deposit. In 2002 works are completed on OVOS for operating deposits Uvanas, Kanjugan, Northern Karamurun and Eastern Minkuduk. The results of present work were reported in IAEA conference. The working project 'Remediation of spent blocks of PSV uranium deposit PV-17 polygon of Steppe ore management body' approved in 2005 was developed for carrying out the remediation works. Works funding were carried out from liquidation fund of the current deposit established in accordance with the Republic of Kazakhstan law 'About interior and interior use'. Deposits remediation is the part of deposit operation life cycle which obliges to operate deposits with minimum expenditures for remediation.

  1. Mold: Cleanup and Remediation

    Science.gov (United States)

    ... National Center for Environmental Health (NCEH) Cleanup and Remediation Recommend on Facebook Tweet Share Compartir On This ... CDC and EPA on mold cleanup, removal and remediation. Cleanup information for you and your family Homeowner’s ...

  2. Lessons Learned from Environmental Remediation Programmes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-03-15

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  3. Lessons Learned from Environmental Remediation Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  4. Topical Day on Site Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Vandenhove, H [ed.

    1996-09-18

    Ongoing activities at the Belgian Nuclear Research Centre relating to site remediation and restoration are summarized. Special attention has been paid to the different phases of remediation including characterization, impact assessment, evaluation of remediation actions, and execution of remediation actions.

  5. Project Based Learning in Literature: The Teacher's New Role and the Development of Student's Social Skills in Upper Secondary Education

    Science.gov (United States)

    Styla, Despoina; Michalopoulou, Aikaterini

    2016-01-01

    The present research examines the project method, as it is met at the new curriculum of literature in the first Grade of Greek high schools and the effectiveness of it and of the teacher's role at the development of social skills, of students with low level. At first it is made an effort to measure that level at the beginning of the literature…

  6. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  7. The Arithmetic Project Course for Teachers - 8. Topic: Lower Brackets and Upper Brackets. Supplement: Arithmetic With Frames.

    Science.gov (United States)

    Education Development Center, Inc., Newton, MA.

    This is one of a series of 20 booklets designed for participants in an in-service course for teachers of elementary mathematics. The course, developed by the University of Illinois Arithmetic Project, is designed to be conducted by local school personnel. In addition to these booklets, a course package includes films showing mathematics being…

  8. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    International Nuclear Information System (INIS)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan

  9. Chaos and remedial investigations

    International Nuclear Information System (INIS)

    Galbraith, R.M.

    1991-01-01

    Current research into the nature of chaos indicates that even for systems that are well known and easily modeled, slight changes in the scale used to measure the input have unpredictable results in the model output. The conduct of a remedial investigation (RI) is dictated by well-established rules of investigation and management, yet small changes in project orientation, regulatory environment, or site conditions have unpredictable consequences to the project. The consequences can lead to either brilliant success or utter failure. The chaotic effect of a change in scale is most often illustrated by an exercise in measuring the length of the coast of Great Britain. If a straight ruler 10-kilometers long is used, the sum of the 10-kilometer increments gives the length of the coast. If the ruler is changed to five kilometers long and the exercise is repeated, the sum of the five-kilometer increments will not be the same as the sum of the 10-kilometer increments. Nor is there a way to predict what the length of the coast will be using any other scale. Several examples from the Fernald Project RI are used to illustrate open-quotes changes in scaleclose quotes in both technical and management situations. Given that there is no way to predict the outcome of scale changes in a RI, technical and project management must be alert to the fact that a scale has changed and the investigation is no longer on the path it was thought to be on. The key to success, therefore, is to develop specific units of measure for a number of activities, in addition to cost and schedule, and track them regularly. An example for tracking a portion of the field investigation is presented. The determination of effective units of measure is perhaps the most difficult aspect of any project. Changes in scale sometimes go unnoticed until suddenly the budget is expended and only a portion of the work is completed. Remedial investigations on large facilities provide new and complex challenges

  10. Automated sample analysis and remediation

    International Nuclear Information System (INIS)

    Hollen, R.; Settle, F.

    1995-01-01

    The Contaminant Analysis Automation Project is developing an automated chemical analysis system to address the current needs of the US Department of Energy (DOE). These needs focus on the remediation of large amounts of radioactive and chemically hazardous wastes stored, buried and still being processed at numerous DOE sites. This paper outlines the advantages of the system under development, and details the hardware and software design. A prototype system for characterizing polychlorinated biphenyls in soils is also described

  11. Sampling and analysis plan for volatile organic compounds in storm drain for the Upper East Fork Poplar Creek characterization area remedial investigation at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-03-01

    The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy and managed by Lockheed Martin Energy Systems, Inc. The Y-12 Plant is one of three major facilities on the ORR. The ORR contains both hazardous- and mixed-waste sites that are subject to regulations promulgated under the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986. Under RCRA guidelines and requirements from the Tennessee Department of Environment and Conservation, the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire ORR was placed on the National Priorities List of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions

  12. Remediation of sites with dispersed radioactive contamination

    International Nuclear Information System (INIS)

    2004-01-01

    To respond to the needs of Member States, the IAEA launched an environmental remediation project to deal with the problems of radioactive contamination worldwide. The IAEA environmental remediation project includes an IAEA Coordinated Research Project, as well as the participation of IAEA experts in concrete remediation projects when requested by individual Member States. The IAEA has prepared several documents dedicated to particular technical or conceptual areas, including documents on the characterization of contaminated sites, technical and non-technical factors relevant to the selection of a preferred remediation strategy and technique, overview of applicable techniques for environmental remediation,, options for the cleanup of contaminated groundwater and planning and management issues. In addition, a number of other IAEA publications dealing with related aspects have been compiled under different IAEA projects; these include TECDOCs on the remediation of uranium mill tailings, the decontamination of buildings and roads and the characterization of decommissioned sites. Detailed procedures for the planning and implementation of remedial measures have been developed over the past decade or so. A critical element is the characterization of the contamination and of the various environmental compartments in which it is found, in order to be able to evaluate the applicability of remediation techniques. The chemical or mineralogical form of the contaminant will critically influence the efficiency of the remediation technique chosen. Careful delineation of the contamination will ensure that only those areas or volumes of material that are actually contaminated are treated. This, in turn, reduces the amount of any secondary waste generated. The application of a remediation technique requires holistic studies examining the technical feasibility of the proposed measures, including analyses of their impact. Consequently, input from various scientific and engineering

  13. Genetic associations of 115 polymorphisms with cancers of the upper aerodigestive tract across 10 European countries: the ARCAGE project.

    LENUS (Irish Health Repository)

    Canova, Cristina

    2009-04-01

    Cancers of the upper aerodigestive tract (UADT) include malignant tumors of the oral cavity, pharynx, larynx, and esophagus and account for 6.4% of all new cancers in Europe. In the context of a multicenter case-control study conducted in 14 centers within 10 European countries and comprising 1,511 cases and 1,457 controls (ARCAGE study), 115 single nucleotide polymorphisms (SNP) from 62 a priori-selected genes were studied in relation to UADT cancer. We found 11 SNPs that were statistically associated with UADT cancers overall (5.75 expected). Considering the possibility of false-positive results, we focused on SNPs in CYP2A6, MDM2, tumor necrosis factor (TNF), and gene amplified in squamous cell carcinoma 1 (GASC1), for which low P values for trend (P trend<0.01) were observed in the main effects analyses of UADT cancer overall or by subsite. The rare variant of CYP2A6 -47A>C (rs28399433), a phase I metabolism gene, was associated with reduced UADT cancer risk (P trend=0.01). Three SNPs in the MDM2 gene, involved in cell cycle control, were associated with UADT cancer. MDM2 IVS5+1285A>G (rs3730536) showed a strong codominant effect (P trend=0.007). The rare variants of two SNPs in the TNF gene were associated with a decreased risk; for TNF IVS1+123G>A (rs1800610), the P trend was 0.007. Variants in two SNPs of GASC1 were found to be strongly associated with increased UADT cancer risk (for both, P trend=0.008). This study is the largest genetic epidemiologic study on UADT cancers in Europe. Our analysis points to potentially relevant genes in various pathways.

  14. The Origins of Air Parcels Uplifted in a Two Dimensional Gravity Wave in the Tropical Upper Troposphere During the NASA Stratosphere Troposphere Exchange Project (STEP)

    Science.gov (United States)

    Selkirk, Henry B.; Pfister, Leonhard; Chan, K. Roland; Kritz, Mark; Kelly, Ken

    1989-01-01

    During January and February 1987, as part of the Stratosphere-Troposphere Exchange Project, the NASA ER-2 made 11 flights from Darwin, Australia to investigate dehydration mechanisms in the vicinity of the tropical tropopause. After the monsoon onset in the second week of January, steady easterly flow of 15-25 ms (exp -1) was established in the upper troposphere and lower stratosphere over northern Australia and adjacent seas. Penetrating into this regime were elements of the monsoon convection such as overshooting convective turrets and extensive anvils including cyclone cloud shields. In cases of the latter, the resulting flow obstructions tended to produce mesoscale gravity waves. In several instances the ER- 2 meteorological and trace constituent measurements provide a detailed description of the structure of these gravity waves. Among these was STEP Flight 6, 22-23 January. It is of particular interest to STEP because of the close proximity of ice-laden and dehydrated air on the same isentropic surfaces. Convective events inject large amounts of ice into the upper troposphere and lower stratosphere which may not be completely removed by local precipitation processes. In the present instance, a gravity wave for removed from the source region appears to induce relativity rapid upward motion in the ice-laden air and subsequent dessication. Potential mechanisms for such a localized removal process are under investigation.

  15. Investigation of geology and hydrology of the upper and middle Verde River watershed of central Arizona: a project of the Arizona Rural Watershed Initiative

    Science.gov (United States)

    Woodhouse, Betsy; Flynn, Marilyn E.; Parker, John T.C.; Hoffmann, John P.

    2002-01-01

    The upper and middle Verde River watershed in west-central Arizona is an area rich in natural beauty and cultural history and is an increasingly popular destination for tourists, recreationists, and permanent residents seeking its temperate climate. The diverse terrain of the region includes broad desert valleys, upland plains, forested mountain ranges, narrow canyons, and riparian areas along perennial stream reaches. The area is predominantly in Yavapai County, which in 1999 was the fastest-growing rural county in the United States (Woods and Poole Economics, Inc., 1999); by 2050, the population is projected to more than double. Such growth will increase demands on water resources. The domestic, industrial, and recreational interests of the population will need to be balanced against protection of riparian, woodland, and other natural areas and their associated wildlife and aquatic habitats. Sound management decisions will be required that are based on an understanding of the interactions between local and regional aquifers, surface-water bodies, and recharge and discharge areas. This understanding must include the influence of climate, geology, topography, and cultural development on those components of the hydrologic system. In 1999, the U.S. Geological Survey (USGS), in cooperation with the Arizona Department of Water Resources (ADWR), initiated a regional investigation of the hydrogeology of the upper and middle Verde River watershed. The project is part of the Rural Watershed Initiative (RWI), a program established by the State of Arizona and managed by the ADWR that addresses water supply issues in rural areas while encouraging participation from stakeholder groups in affected communities. The USGS is performing similar RWI investigations on the Colorado Plateau to the north and in the Mogollon Highlands to the east of the Verde River study area (Parker and Flynn, 2000). The objectives of the RWI investigations are to develop: (1) a single database

  16. Remediation of contaminated areas in the aftermath of the accident at the Fukushima Daiichi Nuclear Power Station. Overview, analysis and lessons learned. Part 1. A report on the ''decontamination pilot project''

    International Nuclear Information System (INIS)

    Nakayama, Shinichi; Kawase, Keiichi; Iijima, Kazuki; Miyahara, Kaname; Hardie, Susan; McKinley, Ian; Klein, Liza; Yashio, Shoko

    2015-03-01

    In the wake of the Great Tohoku earthquake and tsunami, which resulted in significant damage to the Fukushima Daiichi nuclear power station, considerable radioactive discharge and deposition occurred. Populations were evacuated from the zones that received the most deposition and overarching 'Special Measures' laws established the Ministry of the Environment (MOE) as the department responsible for decontamination to remediate the environment. Major challenges to implementing full-scale environmental decontamination were the absence of real-world examples and also lack of experience in planning and implementing decontamination technology appropriate to the physical and social boundary conditions in both Japan and Fukushima. The Japan Atomic Energy Agency (JAEA) was thus charged with conducting a range of 'Decontamination Pilot Project' to examine the applicability of decontamination technologies, with a special focus on reducing dose rates and thus allowing evacuees to return to re-establish their normal lifestyles as quickly as possible, whilst simultaneously maintaining worker safety. The Decontamination Pilot Project was implemented at 16 sites in 11 municipalities within the evacuated zone, including locations that received the highest deposition. Despite tight boundary conditions in terms of timescale and resources, the Decontamination Pilot Project provides a good basis for developing recommendations on how to assure decontamination efficiency and worker safety whilst additionally constraining costs, subsequent waste management and environmental impacts. The Decontamination Pilot Project has thus played a key role in the drafting of guidelines and manuals that are currently being used as a source of reference by the national government, local municipalities and the contractors performing regional decontamination. Part 1 of this report summarises the Decontamination Pilot Project, providing the background required to put this work in context for an

  17. Synthesis of the PHYTENER project. Development of phyto-remediation on soils contaminated by metals for energy purposes: ecologic viability, social interest and economic assessment. Synthesis

    International Nuclear Information System (INIS)

    Bidar, Geraldine; Detriche, Sebastien; Douay, Francis; Fourrier, Herve; Louvel, Brice; Pelfrene, Aurelie; Pourrut, Bertrand; Nsanganwimana, Florien; Pruvot, Christelle; Waterlot, Christophe; Muchembled, Jerome; Comont, Eric; Statnik, Corinne; Demuynck, Sylvain; Grumiaux, Fabien; Lemiere, Sebastien; Lepretre, Alain; Pernin, Celine; Pauwels, Jean-Francois; Therssen, Eric; Deram, Annabelle; Hayet, Audrey; Billet, Sylvain; Firmin, Stephane; Fontaine, Joel; Labidi, Sonia; Lounes-Hadj Sahraoui, Anissa; Shirali, Pirouz; Tisserand, Benoit; Verdin, Anthony; Cazier, Fabrice; Dorothee, Dewaele; Genevray, Paul; Scheifler, Renaud; Proix, Nicolas; Retailleau, Julien; Richard, Antoine; Blarel, Jacques; Lefevre, Benoit; Billaut, Geoffrey; Cadiere, Frederique; Collet, Bastien; Faure, Olivier; Lamy, Isabelle

    2015-03-01

    This publication proposes a synthesis of results obtained within a multi-disciplinary research programme, Phytener, performed between 2009 and 2013. This programme notably considered the case of ancient mining sites and of the associated soil contaminations (by cadmium, lead or zinc), and the study of the use of phyto-technologies for a better management of highly contaminated agricultural spaces. These studies addressed management modes based on phyto-remediation (assisted or not) of cadmium, lead and zinc, with the implication of two biomass production sectors: wood (with the following species: Robinia pseudoacacia, Alnus glutinosa, Quercus ilex and Acer pseudoplatanus) and an herbaceous vegetation (Miscanthus x giganteus). The objective was then to assess the ecologic viability of the proposed management modes, to contribute to a sustainable redevelopment of agriculture, and to give back an economic interest to disqualified agricultural soils while meeting environmental, economic and social demands. Thus, the authors present the experimental approach and discuss the obtained results

  18. Remedial Measures for Erroneous Environmental Policies: Assessing Infrastructure Projects of Waste-to-Energy Incineration in Taiwan with a Case Study of the Taitung Incinerator

    Directory of Open Access Journals (Sweden)

    Lih-Ren Liu

    2016-12-01

    Full Text Available Taiwan, like many other countries, often incentivizes private investors to participate in the construction of infrastructures for environmental protection. The build-operate-transfer (BOT or build-operate-own (BOO model of financing public infrastructure was introduced to Taiwan in the 1990s. Among them, the construction of incinerators to treat the municipal solid waste using the BOT/BOO model was quite a success in the beginning. With the socio-technical change of lifestyle and waste generation, the amount of amount of trash dropped dramatically. The policy failed eventually, however, because the government over-estimated the trash quantity and refrained from inter-municipality cooperation to treat trash efficiently. This failure triggered a rash of intense debates and legal disputes. In the case of the Taitung incinerator, the 26th incinerator located in southeastern Taiwan, the arbitration resulted in the government making significant compensation payments to the private sector. The finished construction was consequently converted into a “mothballed and pensioned off” facility. This study applies in-depth interviews and literature review to discuss aspects contributing to the policy failure and proposes some possible remedial measures. Five aspects are summarized, namely, the administrative organization’s rigid attitude, the irrationality of the BOT/BOO contracts, the loss of the spirit of BOO partnerships, the heavy financial burden on local government, and the abandonment of inter-municipality cooperation. The remedial measures for the policy failure are presented in the form of thorough policy evaluation, room for contract adjustments under the BOT/BOO model, encouragement of cross-boundary cooperation, and revision of the legal framework for implementing decentralization.

  19. Risk-based remediation: Approach and application

    International Nuclear Information System (INIS)

    Frishmuth, R.A.; Benson, L.A.

    1995-01-01

    The principle objective of remedial actions is to protect human health and the environment. Risk assessments are the only defensible tools available to demonstrate to the regulatory community and public that this objective can be achieved. Understanding the actual risks posed by site-related contamination is crucial to designing cost-effective remedial strategies. All to often remedial actions are overdesigned, resulting in little to no increase in risk reduction while increasing project cost. Risk-based remedial actions have recently been embraced by federal and state regulators, industry, government, the scientific community, and the public as a mechanism to implement rapid and cost-effective remedial actions. Emphasizing risk reduction, rather than adherence to ambiguous and generic standards, ensures that only remedial actions required to protect human health and the environment at a particular site are implemented. Two sites are presented as case studies on how risk-based approaches are being used to remediate two petroleum hydrocarbon contaminated sites. The sites are located at two US Air Force Bases, Wurtsmith Air Force Base (AFB) in Oscoda, Michigan and Malmstrom AFB in Great Falls, Montana

  20. Watershed prioritization in the upper Han River basin for soil and water conservation in the South-to-North Water Transfer Project (middle route) of China.

    Science.gov (United States)

    Wu, Haibing

    2018-01-01

    Watershed prioritization with the objective of identifying critical areas to undertake soil and water conservation measures was conducted in the upper Han River basin, the water source area of approximately 95,000 km 2 for the middle route of China's South-to-North Water Transfer Project. Based on the estimated soil erosion intensity in uplands and clustering analysis of measured nutrient concentrations in rivers, the basin was grouped into very-high-, high-, moderate-, and low-priority regions for water and soil conservation, respectively. The results indicated that soil erosion was primarily controlled by topography, and nutrients in rivers were associated with land use and land cover in uplands. Also, there was large spatial disparity between soil erosion intensity in the uplands and nutrient concentrations in the rivers across the basin. Analysis was then performed to prioritize the basin by the integration of the soil erosion intensity and water quality on a GIS platform in order to identify critical areas for water and soil conservation in the basin. The identified high-priority regions which occupy 5.74% of the drainage areas need immediate attention for soil and water conservation treatments, of which 5.28% is critical for soil erosion prevention and 0.46% for water conservation. Understandings of the basin environment and pollutant loading with spatial explicit are critical to the soil and water resource conservation for the interbasin water transfer project.

  1. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  2. International experience in tailings pond remediation

    International Nuclear Information System (INIS)

    Robertson, A.MacG.

    2001-01-01

    Tailings pond remediation is required primarily on mine closure. While mining is an ancient industry, requirement for mine facility remediation is a comparatively new development. Requirement for remediation has come about partly as a result of mans awareness of the environmental impacts of mining and his desire to minimize this, partly, as a result of the ever-increasing scale and production rates of tailings generation and the resulting increased environmental impacts and safety risks. The paper starts with a review of the evolution of mans intolerance of environmental impacts from tailings production and the assignment of liability to remediate such impacts. Many of the tailings ponds currently undergoing remediation were designed and constructed using methods and technology that would be considered inappropriate for new impoundments being designed and developed today. The paper reviews the history of tailings impoundment design and construction practice and the resulting inherent deficiencies that must be remediated. Current practices and future trends in tailings pond remediation are reviewed. The evolution of regulatory requirements is not only in terms of technical and safety criteria, but also in terms of financial and political risk. Perhaps the most substantive driver of risk management is today the requirement for corporate governance at mining company board level and oversight of new project development in the underdeveloped countries by the large financial institutions responsible for funding projects. Embarrassment in the public eye and punishment in the stock markets for poor environmental and safety performance is driving the need for efficient and effective risk management of potential impacts and the remediation to avoid these. A basis for practical risk management is described. (orig.)

  3. International experience in tailings pond remediation

    Energy Technology Data Exchange (ETDEWEB)

    MacG. Robertson, A. [Robertson GeoConsultants Ltd., Vancouver (Canada)

    2001-07-01

    Tailings pond remediation is required primarily on mine closure. While mining is an ancient industry, requirement for mine facility remediation is a comparatively new development. Requirement for remediation has come about partly as a result of mans awareness of the environmental impacts of mining and his desire to minimize this, partly, as a result of the ever-increasing scale and production rates of tailings generation and the resulting increased environmental impacts and safety risks. The paper starts with a review of the evolution of mans intolerance of environmental impacts from tailings production and the assignment of liability to remediate such impacts. Many of the tailings ponds currently undergoing remediation were designed and constructed using methods and technology that would be considered inappropriate for new impoundments being designed and developed today. The paper reviews the history of tailings impoundment design and construction practice and the resulting inherent deficiencies that must be remediated. Current practices and future trends in tailings pond remediation are reviewed. The evolution of regulatory requirements is not only in terms of technical and safety criteria, but also in terms of financial and political risk. Perhaps the most substantive driver of risk management is today the requirement for corporate governance at mining company board level and oversight of new project development in the underdeveloped countries by the large financial institutions responsible for funding projects. Embarrassment in the public eye and punishment in the stock markets for poor environmental and safety performance is driving the need for efficient and effective risk management of potential impacts and the remediation to avoid these. A basis for practical risk management is described. (orig.)

  4. Prototype Tests for the Recovery and Conversion of UF6 Chemisorbed in NaF Traps for the Molten Salt Reactor Remediation Project

    International Nuclear Information System (INIS)

    Del Cul, G.D.; Icenhour, A.S.; Simmons, D.W.

    2000-01-01

    The remediation of the Molten Salt Reactor Experiment (MSRE) site includes the removal of about 37 kg of uranium. Of that inventory, about 23 kg have already been removed from the piping system and chemisorbed in 25 NaF traps. This material is being stored in Building 3019. The planned recovery of -11 kg of uranium from the fuel salt will generate another 15 to 19 NaF traps. The remaining 2 to 3 kg of uranium are present in activated charcoal beds, which are also scheduled to be removed from the reactor site. Since all of these materials (NaF traps and the uranium-laden charcoal) are not suitable for long-term storage, they will be converted to a chemical form (uranium oxide), which is suitable for long-term storage. This document describes the process that will be used to recover and convert the uranium in the NaF traps into a stable oxide for long-term storage. Included are a description of the process, equipment, test results, and lessons learned. The process was developed for remote operation in a hot cell. Lessons learned from the prototype testing were incorporated into the process design

  5. Prototype Tests for the Recovery and Conversion of UF6 Chemisorbed in NaF Traps for the Molten Salt Reactor Remediation Project

    Energy Technology Data Exchange (ETDEWEB)

    Del Cul, G.D.; Icenhour, A.S.; Simmons, D.W.

    2000-04-01

    The remediation of the Molten Salt Reactor Experiment (MSRE) site includes the removal of about 37 kg of uranium. Of that inventory, about 23 kg have already been removed from the piping system and chemisorbed in 25 NaF traps. This material is being stored in Building 3019. The planned recovery of -11 kg of uranium from the fuel salt will generate another 15 to 19 NaF traps. The remaining 2 to 3 kg of uranium are present in activated charcoal beds, which are also scheduled to be removed from the reactor site. Since all of these materials (NaF traps and the uranium-laden charcoal) are not suitable for long-term storage, they will be converted to a chemical form [uranium oxide], which is suitable for long-term storage. This document describes the process that will be used to recover and convert the uranium in the NaF traps into a stable oxide for long-term storage. Included are a description of the process, equipment, test results, and lessons learned. The process was developed for remote operation in a hot cell. Lessons learned from the prototype testing were incorporated into the process design.

  6. Prototype Tests for the Recovery and Conversion of UF6Chemisorbed in NaF Traps for the Molten Salt Reactor Remediation Project

    Energy Technology Data Exchange (ETDEWEB)

    Del Cul, G.D.

    2000-06-07

    The remediation of the Molten Salt Reactor Experiment (MSRE) site includes the removal of about 37 kg of uranium. Of that inventory, about 23 kg have already been removed from the piping system and chemisorbed in 25 NaF traps. This material is being stored in Building 3019. The planned recovery of {approx}11 kg of uranium from the fuel salt will generate another 15 to 19 NaF traps. The remaining 2 to 3 kg of uranium are present in activated charcoal beds, which are also scheduled to be removed from the reactor site. Since all of these materials (NaF traps and the uranium-laden charcoal) are not suitable for long-term storage, they will be converted to a chemical form [uranium oxide (U{sub 3}O{sub 8})], which is suitable for long-term storage. This document describes the process that will be used to recover and convert the uranium in the NaF traps into a stable oxide for long-term storage. Included are a description of the process, equipment, test results, and lessons learned. The process was developed for remote operation in a hot cell. Lessons learned from the prototype testing were incorporated into the process design.

  7. Provincial labour market study : mould remediation industry

    International Nuclear Information System (INIS)

    2003-06-01

    Indoor exposure to mold can be problematic to human health, and some molds are considered to be toxigenic. The emergent mold remediation industry in Ontario is fragmented, with various different standards, training and certification processes. This report investigated the labour market for mold remediation workers, with particular reference to training needs and priorities. Research was derived from a literature review in order to analyze the economic, legal, technical and social context of the mold remediation industry. Data on the organized work force were obtained from records of the International Union of Painters and Allied Trades, the Labour Force Historical Review 2002, and various publications. Population data from the Ontario government and Statistics Canada were also used. Surveys of workers and employers were conducted with questionnaires. Results of the surveys indicated that mold remediation projects currently constitute a minority share of most companies' business. However, the importance of mold remediation projects is expected to increase, and industry self-regulation is the most likely scenario for the development of standards and related training programs. It was suggested that the creation of an industry body representing key stakeholder constituencies or the legitimization of an existing industry organization will reduce fragmentation and facilitate research, standard setting and certification, as well as improve marketing and education. If the demand for mold remediation services increases as anticipated, the industry will face the challenge of remaining competitive in the province's projected labour market due to shortages in personnel. There was a strong consensus between employers and workers in the mold remediation industry regarding the need for skills upgrading and compulsory certification. It was concluded that leadership is needed in the development and delivery of training programs, standard setting, recruitment and retention and

  8. Aquifer Characteristics Data Report for the Weldon Spring Site chemical plant/raffinate pits and vicinity properties for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-11-01

    This report describes the procedures and methods used, and presents the results of physical testing performed, to characterize the hydraulic properties of the shallow Mississippian-Devonian aquifer beneath the Weldon Spring chemical plant, raffinate pits, and vicinity properties. The aquifer of concern is composed of saturated rocks of the Burlington-Keokuk Limestone which constitutes the upper portion of the Mississippian-Devonian aquifer. This aquifer is a heterogeneous anisotropic medium which can be described in terms of diffuse Darcian flow overlain by high porosity discrete flow zones and conduits. Average hydraulic conductivity for all wells tested is 9.6E-02 meters/day (3.1E-01 feet/day). High hydraulic conductivity values are representative of discrete flow in the fractured and weathered zones in the upper Burlington-Keokuk Limestone. They indicate heterogeneities within the Mississippian-Devonian aquifer. Aquifer heterogeneity in the horizontal plane is believed to be randomly distributed and is a function of fracture spacing, solution voids, and preglacial weathering phenomena. Relatively high hydraulic conductivities in deeper portions of the aquifer are though to be due to the presence of widely spaced fractures. 44 refs., 27 figs., 9 tabs

  9. Electrodialytic soil remediation

    DEFF Research Database (Denmark)

    Karlsmose, Bodil; Ottosen, Lisbeth M.; Hansen, Lene

    1999-01-01

    The paper gives an overview of how heavy metals can be found in the soil and the theory of electrodialytic remediation. Basically electrodialytic remediation works by passing electric current through the soil, and the heavy metals in ionic form will carry some of the current. Ion-exchange membranes...... prevents the protons and the hydroxides ions from the electrode processes to enter the soil. The heavy metals are collected in a concentration compartment, which is separated from the soil by ion-exchange membranes. Examples from remediation experiments are shown, and it is demonstrated that it is possible...... to remediate soil polluted with heavy metals be this method. When adding desorbing agents or complexing agents, chosing the right current density, electrolyte and membranes, the proces can be optimised for a given remediation situation. Also electroosmosis is influencing the system, and if extra water...

  10. Status report: Fernald site remediation

    International Nuclear Information System (INIS)

    Craig, J.R. Jr.; Saric, J.A.; Schneider, T.; Yates, M.K.

    1995-01-01

    The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process

  11. 3,000 Paper Cranes: Children's Literature for Remedial Readers.

    Science.gov (United States)

    Shumaker, Marjorie P.; Shumaker, Ronald C.

    1988-01-01

    Describes how the educational experience of sixth grade remedial readers was revitalized and enriched through a project that grew out of reading "Sadako and the Thousand Paper Cranes." Suggests using "real" books (literature) to liberate remedial students from skill drills and reading games. (NH)

  12. Assessing the wider environmental value of remediating land contamination

    NARCIS (Netherlands)

    Bardos, R.P.; Kearney, T.E.; Nathanail, C.P.; Weenk, A.; Martin, I.D.

    2000-01-01

    The aim of this paper is to consider qualitative and quantitative approaches for assessing the wider environmental value of remediating land contamination. In terms of the environmental element of sustainable development, a remediation project's overall environmental performance is the sum of the

  13. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  14. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  15. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  16. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation

  17. Benchmark Analyses of Sodium Natural Convection in the Upper Plenum of the Monju Reactor Vessel. Final Report of a Coordinated Research Project 2008-2012

    International Nuclear Information System (INIS)

    2014-11-01

    The IAEA supports Member States in the area of advanced fast reactor technology development by providing a major fulcrum for information exchange and collaborative research programmes. The IAEA’s activities in this field are mainly carried out within the framework of the Technical Working Group on Fast Reactors (TWG-FR), which assists in the implementation of corresponding IAEA support, and ensures that all technical activities are in line with expressed needs of Member States. Among this broad range, the IAEA proposes and establishes coordinated research projects (CRPs), aimed at improving Member State capability in fast reactor design and analysis. An important opportunity to perform collaborative research activities was provided by the system startup tests carried out by the Japan Atomic Energy Agency (JAEA) in the prototype loop type sodium cooled fast reactor Monju, in particular a turbine trip test performed in December 1995. As the JAEA opened the experimental dataset to international collaboration in 2008, the IAEA launched the CRP on Benchmark Analyses of Sodium Natural Convection in the Upper Plenum of the Monju Reactor Vessel. The CRP, together with eight institutes from seven States, has contributed to improving capabilities in sodium cooled fast reactors simulation through code verification and validation, with particular emphasis on thermal stratification and natural circulation phenomena

  18. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords

  19. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  20. Environmental Remediation Data Management Tools

    International Nuclear Information System (INIS)

    Wierowski, J. V.; Henry, L. G.; Dooley, D. A.

    2002-01-01

    Computer software tools for data management can improve site characterization, planning and execution of remediation projects. This paper discusses the use of two such products that have primarily been used within the nuclear power industry to enhance the capabilities of radiation protection department operations. Advances in digital imaging, web application development and programming technologies have made development of these tools possible. The Interactive Visual Tour System (IVTS) allows the user to easily create and maintain a comprehensive catalog containing digital pictures of the remediation site. Pictures can be cataloged in groups (termed ''tours'') that can be organized either chronologically or spatially. Spatial organization enables the user to ''walk around'' the site and view desired areas or components instantly. Each photo is linked to a map (floor plan, topographical map, elevation drawing, etc.) with graphics displaying the location on the map and any available tour/component links. Chronological organization enables the user to view the physical results of the remediation efforts over time. Local and remote management teams can view these pictures at any time and from any location. The Visual Survey Data System (VSDS) allows users to record survey and sample data directly on photos and/or maps of areas and/or components. As survey information is collected for each area, survey data trends can be reviewed for any repetitively measured location or component. All data is stored in a Quality Assurance (Q/A) records database with reference to its physical sampling point on the site as well as other information to support the final closeout report for the site. The ease of use of these web-based products has allowed nuclear power plant clients to plan outage work from their desktop and realize significant savings with respect to dose and cost. These same tools are invaluable for remediation and decommissioning planning of any scale and for recording

  1. Natural Remediation at Savannah River Site

    International Nuclear Information System (INIS)

    Lewis, C. M.; Van Pelt, R.

    2002-01-01

    Natural remediation is a general term that includes any technology or strategy that takes advantage of natural processes to remediate a contaminated media to a condition that is protective of human health and the environment. Natural remediation techniques are often passive and minimally disruptive to the environment. They are generally implemented in conjunction with traditional remedial solutions for source control (i.e., capping, stabilization, removal, soil vapor extraction, etc.). Natural remediation techniques being employed at Savannah River Site (SRS) include enhanced bio-remediation, monitored natural attenuation, and phytoremediation. Enhanced bio-remediation involves making nutrients available and conditions favorable for microbial growth. With proper precautions and feeding, the naturally existing microbes flourish and consume the contaminants. Case studies of enhanced bio-remediation include surface soils contaminated with PCBs and pesticides, and Volatile Organic Compound (VOC) contamination in both the vadose zone and groundwater. Monitored natural attenuation (MNA) has been selected as the preferred alternative for groundwater clean up at several SRS waste units. Successful implementation of MNA has been based on demonstration that sources have been controlled, groundwater modeling that indicates that plumes will not expand or reach surface water discharge points at levels that exceed regulatory limits, and continued monitoring. Phytoremediation is being successfully utilized at several SRS waste units. Phytoremediation involves using plants and vegetation to uptake, break down, or manage contaminants in groundwater or soils. Case studies at SRS include managing groundwater plumes of tritium and VOCs with pine trees that are native to the area. Significant decreases in tritium discharge to a site stream have been realized in one phytoremediation project. Studies of other vegetation types, methods of application, and other target contaminants are

  2. Waste minimization applications at a remediation site

    International Nuclear Information System (INIS)

    Allmon, L.A.

    1995-01-01

    The Fernald Environmental Management Project (FEMP) owned by the Department of Energy was used for the processing of uranium. In 1989 Fernald suspended production of uranium metals and was placed on the National Priorities List (NPL). The site's mission has changed from one of production to environmental restoration. Many groups necessary for producing a product were deemed irrelevant for remediation work, including Waste Minimization. Waste Minimization does not readily appear to be applicable to remediation work. Environmental remediation is designed to correct adverse impacts to the environment from past operations and generates significant amounts of waste requiring management. The premise of pollution prevention is to avoid waste generation, thus remediation is in direct conflict with this premise. Although greater amounts of waste will be generated during environmental remediation, treatment capacities are not always available and disposal is becoming more difficult and costly. This creates the need for pollution prevention and waste minimization. Applying waste minimization principles at a remediation site is an enormous challenge. If the remediation site is also radiologically contaminated it is even a bigger challenge. Innovative techniques and ideas must be utilized to achieve reductions in the amount of waste that must be managed or dispositioned. At Fernald the waste minimization paradigm was shifted from focusing efforts on source reduction to focusing efforts on recycle/reuse by inverting the EPA waste management hierarchy. A fundamental difference at remediation sites is that source reduction has limited applicability to legacy wastes but can be applied successfully on secondary waste generation. The bulk of measurable waste reduction will be achieved by the recycle/reuse of primary wastes and by segregation and decontamination of secondary wastestreams. Each effort must be measured in terms of being economically and ecologically beneficial

  3. Thermal remediation alters soil properties - a review.

    Science.gov (United States)

    O'Brien, Peter L; DeSutter, Thomas M; Casey, Francis X M; Khan, Eakalak; Wick, Abbey F

    2018-01-15

    Contaminated soils pose a risk to human and ecological health, and thermal remediation is an efficient and reliable way to reduce soil contaminant concentration in a range of situations. A primary benefit of thermal treatment is the speed at which remediation can occur, allowing the return of treated soils to a desired land use as quickly as possible. However, this treatment also alters many soil properties that affect the capacity of the soil to function. While extensive research addresses contaminant reduction, the range and magnitude of effects to soil properties have not been explored. Understanding the effects of thermal remediation on soil properties is vital to successful reclamation, as drastic effects may preclude certain post-treatment land uses. This review highlights thermal remediation studies that have quantified alterations to soil properties, and it supplements that information with laboratory heating studies to further elucidate the effects of thermal treatment of soil. Notably, both heating temperature and heating time affect i) soil organic matter; ii) soil texture and mineralogy; iii) soil pH; iv) plant available nutrients and heavy metals; v) soil biological communities; and iv) the ability of the soil to sustain vegetation. Broadly, increasing either temperature or time results in greater contaminant reduction efficiency, but it also causes more severe impacts to soil characteristics. Thus, project managers must balance the need for contaminant reduction with the deterioration of soil function for each specific remediation project. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  5. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  6. Empowering Primary School Pupils through Literacy Remediation ...

    African Journals Online (AJOL)

    Empowering Primary School Pupils through Literacy Remediation Project in Uyo ... and retraining in the hope that this will impact on the pupils' literacy development. ... process and often fail to engage the pupils in activities that promote literacy ... In other to empower such children for meaningful learning, reading needs to ...

  7. Final Hazard Categorization for the Remediation of the 116-C-3 Chemical Waste Tanks

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Blakley; W. D. Schofield

    2007-09-10

    This final hazard categorization (FHC) document examines the hazards, identifies appropriate controls to manage the hazards, and documents the commitments for the 116-C-3 Chemical Waste Tanks Remediation Project. The remediation activities analyzed in this FHC are based on recommended treatment and disposal alternatives described in the Engineering Evaluation for the Remediation to the 116-C-3 Chemical Waste Tanks (BHI 2005e).

  8. Program management strategies for following EPA guidance for remedial design/remedial action at DOE sites

    International Nuclear Information System (INIS)

    Hopper, J.P.; Chew, J.R.; Kowalski, T.E.

    1991-01-01

    At the US Department of Energy (DOE) facilities, environmental restoration is being conducted in accordance with Federal Facilities Compliance Agreements (or Interagency Agreements). These agreements establish a cooperative working relationship and often define roles, responsibilities and authorities for conduct and oversight of the Remedial Action Programs. The US Environmental Protection Agency (EPA) has guidelines on how to initiate and perform remedial actions for sites they are remediating under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Re-Authorization Act (SARA). This paper addresses some of the difference and commonalities between the DOE project management procedures and EPA guidance documents. This report covers only the RD/RA phase of environmental restoration. On the surface, there are many apparent differences between the DOE and EPA project management processes. Upon closer review, however, many of the differences are the result of applying different terminology to the same phase of a project. By looking for the similarities in the two processes rather than hunting for differences, many communication problems are avoided. Understanding both processes also aids in figuring out when, how and to what extent EPA should participate in the RD/RA phase for DOE lead cleanup activities. The DOE Remedial Design and Remedial Action process is discussed in a stepwise manner and compared to the EPA process. Each element of the process is defined. Activities common to both the EPA and DOE are correlated. The annual DOE budget cycle for remediation projects and the four-year cycle for appropriation of remediation funds are discussed, and the constraints of this process examined. DOE orders as well as other requirements for RD/RA activities are summarized and correlated to EPA regulations where this is possible

  9. Superfund Green Remediation

    Science.gov (United States)

    Green remediation is the practice of considering all environmental effects of site cleanup and incorporating options – like the use of renewable energy resources – to maximize the environmental benefits of cleanups.

  10. Tank waste remediation system retrieval and disposal mission infrastructure plan

    International Nuclear Information System (INIS)

    Root, R.W.

    1998-01-01

    This system plan presents the objectives, organization, and management and technical approaches for the Infrastructure Program. This Infrastructure Plan focuses on the Tank Waste Remediation System (TWRS) Project's Retrieval and Disposal Mission

  11. Green Remediation: Best Management Practices for Excavation and Surface Restoration

    Science.gov (United States)

    This fact sheet is one of a series describing best management practices (BMPs) for green remediation, which holistically addresses a cleanup project's energy requirements, air emissions, impacts on water, impacts on land and ecosystems, material consumpt..

  12. MGP site remediation: Working toward presumptive remedies

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1996-01-01

    Manufactured Gas Plants (MGPs) were prevalent in the United States during the 19th and first half of the 20th centuries. MGPs produced large quantities of waste by-products, which varied depending on the process used to manufacture the gas, but most commonly were tars and polynuclear aromatic hydrocarbons. There are an estimated 3,000 to 5,000 abandoned MGP sites across the United States. Because these sites are not concentrated in one geographic location and at least three different manufacturing processes were used, the waste characteristics are very heterogeneous. The question of site remediation becomes how to implement a cost-effective remediation with the variety of cleanup technologies available for these sites. Because of the significant expenditure required for characterization and cleanup of MGP sites, owners and regulatory agencies are beginning to look at standardizing cleanup technologies for these sites. This paper discusses applicable cleanup technologies and the attitude of state regulatory agencies towards the use of presumptive remedies, which can reduce the amount of characterization and detailed analysis necessary for any particular site. Additionally, this paper outlines the process of screening and evaluating candidate technologies, and the progress being made to match the technology to the site

  13. Remedial action planning for Trench 1

    International Nuclear Information System (INIS)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.; Castaneda, N.

    1998-01-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site

  14. Assessing Environmental Sustainability of Remediation Technologies in a Life Cycle Perspective is Not So Easy

    DEFF Research Database (Denmark)

    Owsianiak, Mikolaj; Lemming, Gitte; Hauschild, Michael Zwicky

    2013-01-01

    Integrating sustainability into remediation projects has attracted attention from remediation practitioners, and life cycle assessment (LCA) is becoming a popular tool to address the environmental dimension. The total number of studies has reached 31 since the first framework for LCA of site reme...... about the environmental sustainability of remediation technologies.......Integrating sustainability into remediation projects has attracted attention from remediation practitioners, and life cycle assessment (LCA) is becoming a popular tool to address the environmental dimension. The total number of studies has reached 31 since the first framework for LCA of site...

  15. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  16. Modern (1992–2011) and projected (2012–99) peak snowpack and May–July runoff for the Fort Peck Lake and Lake Sakakawea watersheds in the Upper Missouri River Basin

    Science.gov (United States)

    Stamm, John F.; Todey, Dennis; Mayes Bousted, Barbara; Rossi, Shawn; Norton, Parker A.; Carter, Janet M.

    2016-02-09

    Mountain snowpack is an important contributor to runoff in the Upper Missouri River Basin; for example, high amounts of winter and spring precipitation in the mountains and plains in 2010–11 were associated with the peak runoff of record in 2011 in the Upper Missouri River Basin. To project trends in peak mountain snowpack and runoff in the upcoming decades, multiple linear regression models of peak mountain snowpack and total May–July runoff were developed for the Fort Peck Lake (above Fort Peck Dam) and lower Lake Sakakawea watersheds (between Fort Peck and Garrison Dams) in the Upper Missouri River Basin. Input to regression models included seasonal estimates of precipitation, air temperature, and total reference evapotranspiration stratified by elevation. Calibration was based on records from 107 weather stations from 1991 to 2011. Regressed annual peak mountain snowpack was used as input to the transfer function of May–July runoff. Peak snowpack and May–July runoff were projected for 2012–99 on the basis of air temperature and precipitation from the Community Climate System Model (CCSM) output. Two estimates of projected peak snowpack and May–July runoff for 2012–99 were computed: one estimate was based on output from the CCSM, version 3.0 (CCSM3), and the second estimate was based on output from the CCSM, version 4.0 (CCSM4). The significance of projected trends was based on the Kendall’s tau nonparametric test.

  17. Work plan for support to Upper East Fork Poplar Creek east end VOC plumes well installation project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-03-01

    Under the Resource Conservation and Recovery Act of 1976 guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire Oak Ridge Reservation (ORR) was placed on the National Priorities List of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites in November 1989. Following CERCLA guidelines, sites within the ORR require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) or an engineering evaluation/cost analysis (EE/CA) of potential remedial actions. Data from monitoring wells at the east end of the Y-12 Plant have identified an area of groundwater contamination dominated by the volatile organic compound (VOC) carbon tetrachloride; other VOCs include chloroform, tetrachloroethene, and trichloroethene

  18. Work plan for support to Upper East Fork Poplar Creek east end VOC plumes well installation project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Under the Resource Conservation and Recovery Act of 1976 guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire Oak Ridge Reservation (ORR) was placed on the National Priorities List of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites in November 1989. Following CERCLA guidelines, sites within the ORR require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) or an engineering evaluation/cost analysis (EE/CA) of potential remedial actions. Data from monitoring wells at the east end of the Y-12 Plant have identified an area of groundwater contamination dominated by the volatile organic compound (VOC) carbon tetrachloride; other VOCs include chloroform, tetrachloroethene, and trichloroethene.

  19. Cost and performance of innovative remediation technologies

    International Nuclear Information System (INIS)

    Cummings, J.B.; Kingscott, J.W.; Fiedler, L.D.

    1995-01-01

    The selection and use of more cost-effective remedies requires better access to data on the performance and cost of technologies used in the field. To make data more widely available, the US Environmental Protection Agency is working jointly with member agencies of the Federal Remediation Technologies Round table to publish case studies of full-scale remediation and demonstration projects. EPA, DoD, and DOE have published case studies of cleanup projects primarily consisting of bioremediation, soil vapor extraction, and thermal desorption. Within the limits of this initial data set, the paper evaluates technology performance and cost. In the analysis of cost factors, the paper shows the use of a standardized Work Breakdown Structure (WBS). Use of the WBS will be important in future reporting of completed projects to facilitate cost comparison. The paper notes the limits to normalization and thus cross-site comparison which can be achieved using the WBS. The paper identifies conclusions from initial efforts to compile cost and performance data, highlights the importance of such efforts to the overall remediation effort, and discusses future cost and performance documentation efforts

  20. Remediation of Soil at Nuclear Sites

    International Nuclear Information System (INIS)

    Holmes, R.; Boardman, C.; Robbins, R; Fox, Robert Vincent; Mincher, Bruce Jay

    2000-01-01

    As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste

  1. Uranium mill tailings remedial action technology

    International Nuclear Information System (INIS)

    Hartley, J.N.; Gee, G.W.

    1984-01-01

    The uranium milling process involves the hydrometallurgical extraction of uranium from ores and the resultant generation of large quantities of waste referred to as tailings. Uranium mill tailings have been identified as requiring remediation because they contain residual radioactive material that is not removed in the milling process. Potential radiation exposure can result from direct contact with the tailings, from radon gas emitted by the tailings, and from radioactive contamination of groundwater. As a result, the technology developed under the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) and the US Nuclear Regulatory Commission (NRC) Uranium Recovery Program have focused on radon control, groundwater contamination and the long-term protection of the containment system. This paper briefly summarizes the UMTRAP and NRC remedial action technology development. 33 references, 9 figures, 5 tables

  2. Spring Chinook Salmon Interactions Indices and Residual/Precocial Monitoring in the Upper Yakima Basin; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Pearsons, Todd N.; James, Brenda B.; Johnson, Christopher L. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-05-01

    . 1997). Monitoring ecological interactions will be accomplished using interactions indices. Interactions indices will be used to index the availability of prey and competition for food and space. The tasks described below represent various subject areas of juvenile spring chinook salmon monitoring but are treated together because they can be accomplished using similar methods and are therefore more cost efficient than if treated separately. Three areas of investigation we pursued in this work were: (1) strong interactor monitoring (competition index and prey index), (2) carrying capacity monitoring (microhabitat monitoring); (3) residual and precocial salmon monitoring (abundance). This report is organized into three chapters to represent these three areas of investigation. Data were collected during the summer and fall, 2002 in index sections of the upper Yakima Basin (Figure 1). Hatchery reared spring chinook salmon were first released during the spring of 1999. The monitoring plan for the Yakima/Klickitat Fisheries Project calls for the continued monitoring of the variables covered in this report. All findings in this report should be considered preliminary and subject to further revision as more data and analytical results become available.

  3. Remedial Action Programs annual meeting: Proceedings

    International Nuclear Information System (INIS)

    1988-01-01

    Within the DOE's Office of Nuclear Energy, the Office of Remedial Action and Waste Technology manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. These programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings remedial Action Program and the West Valley Demonstration Project. The programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Surplus Facilities Management Program and was held near DOE Headquarters, in Gaithersburg, Maryland. This volume of proceedings provides the record for the meeting. The proceedings consist of abstracts for each presentation made at the meeting, and the visual aids (if any) used by the speakers. The material is organized in the following pages according to the five different sessions at the meeting: Session 1: Environmental Compliance--Policy; Session 2: Environmental Compliance--Practice; Session 3: Reports from working groups; Session 4: DandD Technology; and Session 5: Remedial Action Technology. The agenda for the meeting and the list of meeting registrants are provided in Appendix A and B, respectively. Individual papers are processed separately for the data base

  4. REMEDIATION TECHNOLOGY EVALUATION AT THE GILT EDGE MINE, SOUTH DAKOTA

    Science.gov (United States)

    This document reports the findings of the Mine Waste Technology Program's Activity III, Project 29,The Remediation Technology Evaluation Project at the Gilt Edge Mine, S.D. This project consisted of evaluating three emerging acidic waste rock stabilization technologies and compar...

  5. To fail is human: remediating remediation in medical education.

    Science.gov (United States)

    Kalet, Adina; Chou, Calvin L; Ellaway, Rachel H

    2017-12-01

    Remediating failing medical learners has traditionally been a craft activity responding to individual learner and remediator circumstances. Although there have been moves towards more systematic approaches to remediation (at least at the institutional level), these changes have tended to focus on due process and defensibility rather than on educational principles. As remediation practice evolves, there is a growing need for common theoretical and systems-based perspectives to guide this work. This paper steps back from the practicalities of remediation practice to take a critical systems perspective on remediation in contemporary medical education. In doing so, the authors acknowledge the complex interactions between institutional, professional, and societal forces that are both facilitators of and barriers to effective remediation practices. The authors propose a model that situates remediation within the contexts of society as a whole, the medical profession, and medical education institutions. They also outline a number of recommendations to constructively align remediation principles and practices, support a continuum of remediation practices, destigmatize remediation, and develop institutional communities of practice in remediation. Medical educators must embrace a responsible and accountable systems-level approach to remediation if they are to meet their obligations to provide a safe and effective physician workforce.

  6. Remediating a design tool

    DEFF Research Database (Denmark)

    Jensen, Mads Møller; Rädle, Roman; Klokmose, Clemens N.

    2018-01-01

    digital sticky notes setup. The paper contributes with a nuanced understanding of what happens when remediating a physical design tool into digital space, by emphasizing focus shifts and breakdowns caused by the technology, but also benefits and promises inherent in the digital media. Despite users......' preference for creating physical notes, handling digital notes on boards was easier and the potential of proper documentation make the digital setup a possible alternative. While the analogy in our remediation supported a transfer of learned handling, the users' experiences across technological setups impact......Sticky notes are ubiquitous in design processes because of their tangibility and ease of use. Yet, they have well-known limitations in professional design processes, as documentation and distribution are cumbersome at best. This paper compares the use of sticky notes in ideation with a remediated...

  7. Thermal soil remediation

    International Nuclear Information System (INIS)

    Nelson, D.

    1999-01-01

    The environmental properties and business aspects of thermal soil remediation are described. Thermal soil remediation is considered as being the best option in cleaning contaminated soil for reuse. The thermal desorption process can remove hydrocarbons such as gasoline, kerosene and crude oil, from contaminated soil. Nelson Environmental Remediation (NER) Ltd. uses a mobile thermal desorption unit (TDU) with high temperature capabilities. NER has successfully applied the technology to target heavy end hydrocarbon removal from Alberta's gumbo clay in all seasons. The TDU consist of a feed system, a counter flow rotary drum kiln, a baghouse particulate removal system, and a secondary combustion chamber known as an afterburner. The technology has proven to be cost effective and more efficient than bioremediation and landfarming

  8. Electrodialytic soil remediation

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Ottosen, Lisbeth M.; Hansen, Lene

    1997-01-01

    It is not possible for all heavy metal polluted soils to remediate it by an applied electric field alone. A desorbing agent must in different cases be added to the soil in order to make the process possible or to make it cost effective......It is not possible for all heavy metal polluted soils to remediate it by an applied electric field alone. A desorbing agent must in different cases be added to the soil in order to make the process possible or to make it cost effective...

  9. Remedial Action Program annual conference: Proceedings

    International Nuclear Information System (INIS)

    1990-01-01

    Within the DOE's Office of Environmental Restoration ampersand Waste Management, the Office of Environmental Restoration manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. The programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings Remedial Action Program, and the West Valley Demonstration Project. These programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive or hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Uranium Mill Tailings Remedial Action Project, DOE-AL, and was held in Albuquerque, NM. This volume of proceedings is the record of that conference. The proceedings consist of abstracts, summaries, or actual text for each presentation made and any visual aids used by the speakers

  10. Solar One demolition and remediation

    International Nuclear Information System (INIS)

    Wallace, G.L.

    1995-01-01

    Solar One was designed to demonstrate the feasibility of generating electrical energy from solar power using a central receiver concept. An array of heliostats focused sunlight onto a central receiver, which superheated water to produce steam. Although Solar One was successful, the oil-based Thermal Storage System (TSS), used to store heat energy for power generation at night, was not efficient. When the TSS was demolished for the installation of a more efficient molten salt system, a major effort was made to salvage or recycle all of its equipment and materials. During TSS demolition, approximately 7 tons of aluminum shielding and 205 tons of steel were salvaged as scrap metal; 200 tons of concrete was used for erosion protection along the Mohave River banks; 150,000 gallons of oil was recycled and 100 tons of equipment was salvaged for use at other facilities. During remediation, approximately 9,000 tons of oil contaminated sand, gravel and soil was recycled into approximately 10,000 tons of asphalt concrete and used to pave a nearby 5-acre parking lot at Barstow College. This not only reduced project remediation costs, but also met environmental requirements and provided a much needed community service. Of the estimated 11,864 tons of equipment and material from the TSS, less than 1% was disposed of at a landfill

  11. DEMONSTRATION OF ELECTROCHEMICAL REMEDIATION TECHNOLOGIES-INDUCED COMPLEXATION

    Energy Technology Data Exchange (ETDEWEB)

    Barry L. Burks

    2002-12-01

    The Project Team is submitting this Topical Report on the results of its bench-scale demonstration of ElectroChemical Remediation Technologies (ECRTs) and in particular the Induced Complexation (ECRTs-IC) process for remediation of mercury contaminated soils at DOE Complex sites. ECRTs is an innovative, in-situ, geophysically based soil remediation technology with over 50 successful commercial site applications involving remediation of over two million metric tons of contaminated soils. ECRTs-IC has been successfully used to remediate 220 cu m of mercury-contaminated sediments in the Union Canal, Scotland. In that operation, ECRTs-IC reduced sediment total mercury levels from an average of 243 mg/kg to 6 mg/kg in 26 days of operation. The clean up objective was to achieve an average total mercury level in the sediment of 20 mg/kg.

  12. Review of Removal, Containment and Treatment Technologies for Remediation of Contaminated Sediment in the Great Lakes

    Science.gov (United States)

    1990-12-01

    selected as a remedy for the St. Paul Waterway Remedial Action and Habitat Restoration Project because it created few adverse impacts and provided great...J. K., Weitkamp, D. E., and Weiner, K. S. 1989. "St. Paul Waterway Remedial Action and Habitat Restoration Project," Contaminated Marine Sedi- ments...Electrocoagulation Anaerobic biodegradation Granular media filtration Flocculation/coagulation BioTrol aqueous treatment Membrane microfiLtration system Freeze

  13. Development of a model for geomorphological assessment at U.S. DOE chemical/radioactive waste disposal facilities in the central and eastern United States; Weldon spring site remedial action project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    Rockaway, J.D.; Smith, R.J.

    1994-01-01

    Landform development and long-term geomorphic stability is the result of a complex interaction of a number of geomorphic processes. These processes may be highly variable in intensity and duration under different physiographic settings. This limitation has influenced the applicability of previous geomorphological stability assessments conducted in the arid or semi-arid western United States to site evaluations in more temperate and humid climates. The purpose of this study was to develop a model suitable for evaluating both long-term and short-term geomorphic processes which may impact landform stability and hence the stability of disposal facilities located in the central and eastern United States. The model developed for the geomorphological stability assessment at the Weldon Spring Site Remedial Action Project (WSSRAP) near St. Louis, Missouri, included an evaluation of existing landforms and consideration of the impact of both long-term and short-term geomorphic processes. These parameters were evaluated with respect to their impact and contribution to three assessment criteria considered most important with respect to the stability analysis; evaluation of landform age, evaluation of present geomorphic process activity and; determination of the impact of the completed facility on existing geomorphic processes. The geomorphological assessment at the Weldon Spring site indicated that the facility is located in an area of excellent geomorphic stability. The only geomorphic process determined to have a potential detrimental effect on long-term facility performance is an extension of the drainage network. A program of mitigating measures has been proposed to minimize the impact that future gully extension could have on the integrity of the facility

  14. Trade Remedies: A Primer

    National Research Council Canada - National Science Library

    Jones, Vivian C

    2006-01-01

    The United States and many of its trading partners use laws known as trade remedies to mitigate the adverse impact of various trade practices on domestic industries and workers. U.S. antidumping laws (19 U.S.C. 1673 et seq...

  15. Modularizing Remedial Mathematics

    Science.gov (United States)

    Wong, Aaron

    2013-01-01

    As remedial mathematics education has become an increasingly important topic of conversation in higher education. Mathematics departments have been put under increased pressure to change their programs to increase the student success rate. A number of models have been introduced over the last decade that represent a wide range of new ideas and…

  16. Trade Remedies: A Primer

    National Research Council Canada - National Science Library

    Jones, Vivian C

    2007-01-01

    The United States and many of its trading partners use laws known as trade remedies to mitigate the adverse impact of various trade practices on domestic industries and workers. U.S. antidumping (AD) laws (19 U.S.C. 1673 et seq...

  17. Trade Remedies: A Primer

    National Research Council Canada - National Science Library

    Jones, Vivian C

    2008-01-01

    The United States and many of its trading partners use laws known as trade remedies to mitigate the adverse impact of various trade practices on domestic industries and workers. U.S. antidumping (AD) laws (19 U.S.C. 1673 et seq...

  18. Catalysts for Environmental Remediation

    DEFF Research Database (Denmark)

    Abrams, B. L.; Vesborg, Peter Christian Kjærgaard

    2013-01-01

    The properties of catalysts used in environmental remediation are described here through specific examples in heterogeneous catalysis and photocatalysis. In the area of heterogeneous catalysis, selective catalytic reduction (SCR) of NOx was used as an example reaction with vanadia and tungsta...

  19. 2014 Ohio Remediation Report

    Science.gov (United States)

    Ohio Board of Regents, 2014

    2014-01-01

    In fulfillment of Ohio Revised Code 3333.041 (A) (1) the Chancellor has published a listing by school district of the number of the 2013 high school graduates who attended a state institution of higher education in academic year 2013-2014 and the percentage of each district's graduates required by the institution to enroll in a remedial course in…

  20. The Remediation of Nosferatu

    DEFF Research Database (Denmark)

    Ghellal, Sabiha; Morrison, Ann; Hassenzahl, Marc

    2014-01-01

    In this paper we present The Remediation of Nosferatu, a location based augmented reality horror adventure. Using the theory of fictional universe elements, we work with diverse material from Nosferatu’s horror genre and vampire themes as a case study. In this interdisciplinary research we...

  1. Innovative vitrification for soil remediation

    International Nuclear Information System (INIS)

    Jetta, N.W.; Patten, J.S.; Hart, J.G.

    1995-01-01

    The objective of this DOE demonstration program is to validate the performance and operation of the Vortec Cyclone Melting System (CMS trademark) for the processing of LLW contaminated soils found at DOE sites. This DOE vitrification demonstration project has successfully progressed through the first two phases. Phase 1 consisted of pilot scale testing with surrogate wastes and the conceptual design of a process plant operating at a generic DOE site. The objective of Phase 2, which is scheduled to be completed the end of FY 95, is to develop a definitive process plant design for the treatment of wastes at a specific DOE facility. During Phase 2, a site specific design was developed for the processing of LLW soils and muds containing TSCA organics and RCRA metal contaminants. Phase 3 will consist of a full scale demonstration at the DOE gaseous diffusion plant located in Paducah, KY. Several DOE sites were evaluated for potential application of the technology. Paducah was selected for the demonstration program because of their urgent waste remediation needs as well as their strong management and cost sharing financial support for the project. During Phase 2, the basic nitrification process design was modified to meet the specific needs of the new waste streams available at Paducah. The system design developed for Paducah has significantly enhanced the processing capabilities of the Vortec vitrification process. The overall system design now includes the capability to shred entire drums and drum packs containing mud, concrete, plastics and PCB's as well as bulk waste materials. This enhanced processing capability will substantially expand the total DOE waste remediation applications of the technology

  2. Simulating Real-World Exposures during Emergency Events: Studying Effects of Indoor and Outdoor Releases in the Urban Dispersion Project in Upper Manhattan, NY

    Science.gov (United States)

    A prospective personal exposure study, involving indoor and outdoor releases, was conducted in upper Midtown Manhattan in New York City as part of the Urban Dispersion Program (UDP) focusing on atmospheric dispersion of chemicals in complex urban settings. The UDP experiments inv...

  3. Forest ecosystem vulnerability assessment and synthesis for northern Wisconsin and western Upper Michigan: a report from the Northwoods Climate Change Response Framework project

    Science.gov (United States)

    Maria K. Janowiak; Louis R. Iverson; David J. Mladenoff; Emily Peters; Kirk R. Wythers; Weimin Xi; Leslie A. Brandt; Patricia R. Butler; Stephen D. Handler; P. Danielle Shannon; Chris Swanston; Linda R. Parker; Amy J. Amman; Brian Bogaczyk; Christine Handler; Ellen Lesch; Peter B. Reich; Stephen Matthews; Matthew Peters; Anantha Prasad; Sami Khanal; Feng Liu; Tara Bal; Dustin Bronson; Andrew Burton; Jim Ferris; Jon Fosgitt; Shawn Hagan; Erin Johnston; Evan Kane; Colleen Matula; Ryan O' Connor; Dale Higgins; Matt St. Pierre; Jad Daley; Mae Davenport; Marla R. Emery; David Fehringer; Christopher L. Hoving; Gary Johnson; David Neitzel; Michael Notaro; Adena Rissman; Chadwick Rittenhouse; Robert Ziel

    2014-01-01

    Forest ecosystems across the Northwoods will face direct and indirect impacts from a changing climate over the 21st century. This assessment evaluates the vulnerability of forest ecosystems in the Laurentian Mixed Forest Province of northern Wisconsin and western Upper Michigan under a range of future climates. Information on current forest conditions, observed climate...

  4. Installation of an innovative remedial technology

    International Nuclear Information System (INIS)

    Hines, B.

    1995-01-01

    The major goal of the Lasagna trademark project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE's sites

  5. Hydrocarbon impacts and remedial action at an active service station

    Energy Technology Data Exchange (ETDEWEB)

    Haidar, S.A. [Keystone Environmental, Burnaby, BC (Canada); Linke, J. [Chevron Canada Ltd., Vancouver, BC (Canada)

    2006-07-01

    This presentation discussed a project that examined the hydrocarbon impacts and remedial action at an active service station. The presentation identified the project partners, discussed the background on the project and project goals. Chevron Canada was the site involved in the study and Keystone Environmental was responsible for testing soil samples, developing the detailed conceptual site model, and for conducting indoor air quality monitoring. The presentation also provided illustrations of the site layout, investigated areas, and soil and groundwater plume. The evaluation and selection of remedial options were also discussed as well as other project planning activities such as assembling the project team, obtaining agreement with stakeholders, and coordinating with the municipality, utility companies, residents, and neighbours. Remediation efforts that were described and illustrated in the presentation included: underpinning and shoring; excavation; and, barrier wall installation. Last, post remediation activities were identified including the installation of post remediation confirmatory wells; reinstating structures; reinstating rear yards, fences, and garages; reconnecting utilities; performance monitoring of barrier wall; and, preparing closure reports for certificates of compliance on off-site properties. 6 figs.

  6. Environmental remediation 1991: ''Cleaning up the environment for the 21st Century''

    International Nuclear Information System (INIS)

    Wood, D.E.

    1991-01-01

    This report presents discussions given at a conference on environmental remediation, September 8--11, Pasco, Washington. Topics include: public confidence; education; in-situ remediation; Hanford tank operations; risk assessments; field experiences; standards; site characterization and monitoring; technology discussions; regulatory issues; compliance; and the UMTRA project. Individual projects are processed separately for the data bases

  7. Environmental remediation 1991: ``Cleaning up the environment for the 21st Century``. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Wood, D.E. [ed.] [Westinghouse Hanford Co., Richland, WA (United States)

    1991-12-31

    This report presents discussions given at a conference on environmental remediation, September 8--11, Pasco, Washington. Topics include: public confidence; education; in-situ remediation; Hanford tank operations; risk assessments; field experiences; standards; site characterization and monitoring; technology discussions; regulatory issues; compliance; and the UMTRA project. Individual projects are processed separately for the data bases.

  8. Remedial action programs annual meeting: Meeting notes

    International Nuclear Information System (INIS)

    1987-01-01

    The US Department of Energy Grand Junction Projects Office was pleased to host the 1987 Remedial Action programs Annual Meeting and herein presents notes from that meeting as prepared (on relatively short notice) by participants. These notes are a summary of the information derived from the workshops, case studies, and ad hoc committee reports rather than formal proceedings. The order of the materials in this report follows the actual sequence of presentations during the annual meeting

  9. Cultural services remediated in Second Life

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2008-01-01

    In 2007, the Danish Public Libraries conducted an experiment in establishing a library in the virtual world Second Life. The Info Island DK provided the framework for a number of online library services and cultural events. This study, based on interviews with most of the active participants...... in the project, discusses the experiences in remediating conventional library services into the new medium and in understanding and redefining the role of the librarian in an online virtual world....

  10. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  11. Compliance monitoring for remediated sites

    International Nuclear Information System (INIS)

    1999-10-01

    Throughout the world, many countries have experienced problems associated with pollution of the environment. Poorly managed practices in nuclear fuel cycle, medicine, industry, weapons production and testing, research and development activities, as well as accidents, and poor disposal practices have produced a large array of radioactively contaminated facilities and sites. Structures, biota, soils, rocks, and both surface and groundwaters have become contaminated with radionuclides and other associated contaminants, a condition that raises serious concern due to potential health effects to the exposed human populations and the environment. In response to the needs of its Member States in dealing with the problems of radioactive contamination in the environment, the IAEA has established an Environmental Restoration Project. The principal aspects of current IAEA efforts in this area include (1) gathering information and data, performing analyses, and publishing technical summaries, and other documents on key technical aspects of environmental restoration; (2) conducting a Co-ordinated Research Project on Environmental Restoration; and (3) providing direct technical assistance to Member States through technical co-operation programmes. The transfer of technologies to Member States in need of applicable methodologies and techniques for the remediation of contaminated sites is a principal objective of this project

  12. Preliminary remediation goals for ecological endpoints

    International Nuclear Information System (INIS)

    Efroymson, R.A.; Suter, G.W. II; Sample, B.E.; Jones, D.S.

    1996-07-01

    Preliminary remediation goals (PRGs) are useful for risk assessment and decision making at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites. PRGs are upper concentration limits for specific chemicals in specific environmental media that are anticipated to protect human health or the environment. They can be used for multiple remedial investigations at multiple facilities. In addition to media and chemicals of potential concern, the development of PRGs generally requires some knowledge or anticipation of future land use. In Preliminary Remediation Goals for Use at the U.S. Department of Energy Oak Ridge Operations Office (Energy Systems 1995), PRGs intended to protect human health were developed with guidance from Risk Assessment Guidance for Superfund: Volume I - Human Health Evaluation Manual, Part B (RAGS) (EPA 1991). However, no guidance was given for PRGs based on ecological risk. The numbers that appear in this volume have, for the most part, been extracted from toxicological benchmarks documents for Oak Ridge National Laboratory (ORNL) and have previously been developed by ORNL. The sources of the quantities, and many of the uncertainties associated with their derivation, are described in this technical memorandum

  13. Preliminary remediation goals for ecological endpoints

    International Nuclear Information System (INIS)

    Efroymson, R.A.; Suter, G.W. II.

    1995-09-01

    Preliminary remediation goals (PRGs) are useful for risk assessment and decision making at Comprehensive Environmental Response, compensation, and Liability Act (CERCLA) sites. PRGs are upper concentration limits for specific chemicals in specific environmental media that are anticipated to protect human health or the environment. They can be used for multiple remedial investigations at multiple facilities. In addition to media and chemicals of potential concern, the development of PRGs generally requires some knowledge or anticipation of future land use. In Preliminary Remediation Goals for Use at the US Department of Energy Oak Ridge Operations Office (Energy Systems 1995), PRGs intended to protect human health were developed with guidance from Risk Assessment Guidance for Superfund: Volume I-Human Health Evaluation Manual, Part B (RAGS) (EPA 1991). However, no guidance was given for PRGs based on ecological risk. The numbers that appear in this volume have, for the most part, been extracted from toxicological benchmarks documents for Oak Ridge National Laboratory (ORNL) and have previously been developed by ORNL. The sources of the quantities, and many of the uncertainties associated with their derivation, are described in this technical memorandum

  14. Adaptive remediation using portable treatment units

    International Nuclear Information System (INIS)

    Bahowick, S.; Folsom, E.; Pico, T.

    1996-01-01

    Lawrence Livermore National Laboratory (LLNL) is using adaptive remediation to optimize their environmental restoration strategy. Adaptive remediation uses hydrostratigraphic analysis to gain a better understanding of the subsurface characteristics, hydraulic tests to optimize contaminant transport models, and Portable Treatment Units (PTUs) as an alternative to fixed facilities. Hydrostratigraphic analysis is an optimization tool that improves the ability to identify and target contaminant migration pathways, identify the relationship between plumes and source areas, and better define hydraulic capture areas. Hydraulic tests, performed with PTUs, provide valuable data about subsurface characteristics. As clean up progresses, PTUs can be moved to the appropriate extraction wells to optimize contaminant mass removal. PTUs can also be placed to support innovative treatment technologies such as steam injection and microbial filters. Construction of PTUs will reduce by one-half the capital costs of building the rest of the fixed treatment system planned in the Record of Decision. Regulatory agencies are receptive to the use of the PTUs because the same treatment technology is being used and the PTUs will be able to clean up the plume cheaper and faster. Using adaptive remediation, LLNL is more effectively implementing remediation plans, improving cleanup time, and reducing project costs

  15. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  16. Remediation Technology Collaboration Development

    Science.gov (United States)

    Mahoney, John; Olsen, Wade

    2010-01-01

    This slide presentation reviews programs at NASA aimed at development at Remediation Technology development for removal of environmental pollutants from NASA sites. This is challenging because there are many sites with different environments, and various jurisdictions and regulations. There are also multiple contaminants. There must be different approaches based on location and type of contamination. There are other challenges: such as costs, increased need for resources and the amount of resources available, and a regulatory environment that is increasing.

  17. Remediating MGP brownfields

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1997-01-01

    Before natural gas pipelines became widespread in this country, gas fuel was produced locally in more than 5,000 manufactured gas plants (MGPs). The toxic wastes from these processes often were disposed onsite and have since seeped into the surrounding soil and groundwater. Although the MGPs--commonly called gas plants, gas-works or town gas plants--have closed and most have been demolished, they have left a legacy of environmental contamination. At many MGP sites, underground storage tanks were constructed of wood or brick, with process piping and equipment which frequently leaked. Waste materials often were disposed onsite. Releases of coal tars, oils and condensates produced within the plants contributed to a wide range of contamination from polycyclic aromatic hydrocarbons, phenols, benzene and cyanide. Remediation of selected MGP sites has been sporadic. Unless the site has been identified as a Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) Superfund site, the regulatory initiative to remediate often remains with the state in which the MGP is located. A number of factors are working to change that picture and to create a renewed interest in MGP site remediation. The recent Brownfield Initiative by the US Environmental Protection Agency (EPA) is such an example

  18. Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Case, Glenn [Atomic Energy of Canada Limited, 115 Toronto Road, Port Hope, Ontario, L1A 3S4 (Canada); Lawrence, Dave [Public Works and Government Services Canada, 115 Toronto Road, Port Hope, Ontario, L1A 3S4 (Canada)

    2013-07-01

    Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be

  19. Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Case, Glenn; Lawrence, Dave

    2013-01-01

    Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered

  20. Innovative vitrification for soil remediation

    Energy Technology Data Exchange (ETDEWEB)

    Jetta, N.W.; Patten, J.S.; Hnat, J.G. [Vortec Corp., Collegeville, PA (United States)

    1995-10-01

    The objective of this DOE demonstration program is to validate the performance and operation of the Vortec Cyclone Melting System (CMS{trademark}) for the processing of LLW contaminated soils found at DOE sites. This DOE vitrification demonstration project has successfully progressed through the first two phases. Phase I consisted of pilot scale testing with surrogate wastes and the conceptual design of a process plant operating at a generic DOE site. The objective of Phase 2, which is scheduled to be completed the end of FY 95, is to develop a definitive process plant design for the treatment of wastes at a specific DOE facility. During Phase 2, a site specific design was developed for the processing of LLW soils and muds containing TSCA organics and RCRA metal contaminants. Phase 3 will consist of a full scale demonstration at the DOE gaseous diffusion plant located in Paducah, KY. Several DOE sites were evaluated for potential application of the technology. Paducah was selected for the demonstration program because of their urgent waste remediation needs as well as their strong management and cost sharing financial support for the project.

  1. Comparison of doses, before and after remedial action

    International Nuclear Information System (INIS)

    Wallo, A. III

    1988-01-01

    The Division of Facility and Site Decommissioning Projects at DOE-Headquarters is evaluating potential doses from vicinity properties before and after remedial action at several sites using the RESRAD computer code. A preliminary review was completed for nineteen Colonie vicinity properties. This review indicated potential doses before remedial action at these sites ranged from about 43 to 2 mrem/year and after remediation between 5 and 0 mrem/year. These estimates indicate the conservatism in the DOE-derived soil decontamination remedial action. Following remedial action, the potential doses are on the order of those being considered to be below regulatory concern by EPA and NRC. The estimates made for these sites are still conservative due to the method used to determine the source term. More realistic assessments of source terms are anticipate dot significantly affect the after-remedial-action doses, possibly lowering them all to below 1 mrem/year. This evaluation is being refined with more realistic estimates of the source term, for all of the Colonie vicinity properties. Once the Colonie vicinity properties are completed, at least three other sites will be evaluated. It is hoped that this information will provide added confidence in the remedial action guidelines and more general acceptance of the guidelines by the EPA and others

  2. Methodology to remediate a mixed waste site

    Energy Technology Data Exchange (ETDEWEB)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ``lessons learned`` from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors.

  3. Methodology to remediate a mixed waste site

    International Nuclear Information System (INIS)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ''lessons learned'' from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors

  4. Uranium Mill Tailings Remedial Action fiscal year 1992 roadmap

    International Nuclear Information System (INIS)

    1993-02-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is funded and managed as two separate projects: Surface remediation (UMTRA-S) and Groundwater compliance (UMTRA-G). Surface remediation is a Major System Acquisition and has been completed at 10 sites, 7 sites are under construction, and 7 sites are in the planning stage. The planning stages of the UMTRA-G Project, a major project, began in April 1991. A programmatic environmental impact statement (PEIS) has been started. Site characterization work and baseline risk assessment will begin FY 1993. Thus, the UMTRA-S Project is a mature and ongoing program with the roles of various organizations well defined, while the UMTRA-G Project is still being formulated and the interfaces between the DOE, states and tribes, and the EPA are being established. The Office of Environmental Restoration and Waste Management (EM) directed that all projects under its authority develop roadmaps for their activities. The UMTRA Project Roadmap was developed by the UMTRA Project Office with input from the TAC, RAC, the GJPO, and assistance from SAIC. A single roadmap has been prepared for both the UMTRA-S and UMTRA-G Projects. This was deemed appropriate due to the close relationship between the projects and to the fact that the same Government and contractor personnel are preparing the roadmaps. Roadmap development is a planning process that focuses on issue identification, root-cause analysis, and issues resolution. The methodology is divided into three phases: assessment, analysis, and issues resolution

  5. The Rush to Remediate: Long Term Performance Favors Passive Systems at SRS

    International Nuclear Information System (INIS)

    Hoffman, D.; Cauthen, K.; Beul, R. R.

    2003-01-01

    The purpose of this paper is to describe the long-term performance of groundwater remediation systems at SRS and compare active versus passive systems. The presentation will focus on the limited effectiveness of active pump and treat systems and share the experience with more passive and natural systems such as soil vapor extraction, barometric pumping, bioremediation, and phytoremediation. Three remediation projects are presented. In each case the waste source is capped with clay or synthetic barriers; however, extensive groundwater contamination remains. The first project features the cleanup of the largest plume in the United States. The second project entails solvent and vinyl chloride remediation of groundwater beneath a hazardous waste landfill. The third project discusses tritium containment from a 160-acre radioactive waste disposal area. Special emphasis is placed on performance data from alternate technology cleanup. The goals are to share remediation data, successes and lessons learned, while making a case for passive systems use in groundwater remediation

  6. Reconstruction of pollution history of organic contaminants in the upper Gulf of Thailand by using sediment cores: first report from Tropical Asia Core (TACO) project.

    Science.gov (United States)

    Boonyatumanond, Ruchaya; Wattayakorn, Gullaya; Amano, Atsuko; Inouchi, Yoshio; Takada, Hideshige

    2007-05-01

    This paper reports the first reconstruction of a pollution history in tropical Asia from sediment cores. Four sediment core samples were collected from an offshore transect in the upper Gulf of Thailand and were analyzed for organic micropollutants. The cores were dated by measurement of (137)Cs and geochronometric molecular markers (linear alkylbenzenes, LABs; and tetrapropylene-type alkylbenzenes, TABs). Polychlorinated biphenyl (PCB) concentrations showed a subsurface maximum in layers corresponding to the 1970s, indicating the effectiveness of regulation of PCBs in Thailand. LAB concentrations increased over time, indicating the increase in input of sewage into the Gulf during the last 30 years. Hopanes, biomarkers of petroleum pollution, also increased over time, indicating that the inputs of automobile-derived hydrocarbons to the coastal zone has been increasing owing to the increased number of cars in Thailand since the 1950s. Polycyclic aromatic hydrocarbons (PAHs) increased in the layers corresponding to the 1950s and 1960s, probably because of the increased inputs of automobile-derived PAHs. PAH concentrations in the upper layers corresponding to the 1970s and later remained constant or increased. The absence of a subsurface maximum of PAHs contrasts with results observed in industrialized countries. This can be explained by the facts that the Thai economy did not depend on coal as an energy source in the 1960s and that economic growth has continued since the 1970s to the present. The deposition flux of PAHs and hopanes showed a dramatic offshore decrease, whereas that of LABs was uniform.

  7. Reconstruction of pollution history of organic contaminants in the upper Gulf of Thailand by using sediment cores: First report from Tropical Asia Core (TACO) project

    International Nuclear Information System (INIS)

    Boonyatumanond, Ruchaya; Wattayakorn, Gullaya; Amano, Atsuko; Inouchi, Yoshio; Takada, Hideshige

    2007-01-01

    This paper reports the first reconstruction of a pollution history in tropical Asia from sediment cores. Four sediment core samples were collected from an offshore transect in the upper Gulf of Thailand and were analyzed for organic micropollutants. The cores were dated by measurement of 137 Cs and geochronometric molecular markers (linear alkylbenzenes, LABs; and tetrapropylene-type alkylbenzenes, TABs). Polychlorinated biphenyl (PCB) concentrations showed a subsurface maximum in layers corresponding to the 1970s, indicating the effectiveness of regulation of PCBs in Thailand. LAB concentrations increased over time, indicating the increase in input of sewage into the Gulf during the last 30 years. Hopanes, biomarkers of petroleum pollution, also increased over time, indicating that the inputs of automobile-derived hydrocarbons to the coastal zone has been increasing owing to the increased number of cars in Thailand since the 1950s. Polycyclic aromatic hydrocarbons (PAHs) increased in the layers corresponding to the 1950s and 1960s, probably because of the increased inputs of automobile-derived PAHs. PAH concentrations in the upper layers corresponding to the 1970s and later remained constant or increased. The absence of a subsurface maximum of PAHs contrasts with results observed in industrialized countries. This can be explained by the facts that the Thai economy did not depend on coal as an energy source in the 1960s and that economic growth has continued since the 1970s to the present. The deposition flux of PAHs and hopanes showed a dramatic offshore decrease, whereas that of LABs was uniform

  8. DOE'S remedial action assurance program

    International Nuclear Information System (INIS)

    Welty, C.G. Jr.; Needels, T.S.; Denham, D.H.

    1984-10-01

    The formulation and initial implementation of DOE's Assurance Program for Remedial Action are described. It was initiated in FY 84 and is expected to be further implemented in FY 85 as the activities of DOE's Remedial Action programs continue to expand. Further APRA implementation will include additional document reviews, site inspections, and program office appraisals with emphasis on Uranium Mill Tailings Remedial Action Program and Surplus Facilities Management Program

  9. [Cognitive remediation and nursing care].

    Science.gov (United States)

    Schenin-King, Palmyre; Thomas, Fanny; Braha-Zeitoun, Sonia; Bouaziz, Noomane; Januel, Dominique

    2016-01-01

    Therapies based on cognitive remediation integrate psychiatric care. Cognitive remediation helps to ease cognitive disorders and enable patients to improve their day-to-day lives. It is essential to complete nurses' training in this field. This article presents the example of a patient with schizophrenia who followed the Cognitive Remediation Therapy programme, enabling him to access mainstream employment. Copyright © 2016 Elsevier Masson SAS. All rights reserved.

  10. In situ remediation of uranium contaminated groundwater

    International Nuclear Information System (INIS)

    Dwyer, B.P.; Marozas, D.C.

    1997-01-01

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field results are discussed with regard to other potential contaminated groundwater treatment applications

  11. Decommissioning and environmental remediation: An overview

    International Nuclear Information System (INIS)

    Chatzis, Irena

    2016-01-01

    The objective in both decommissioning and environmental remediation is to lower levels of residual radioactivity enough that the sites may be used for any purpose, without restriction. In some cases, however, this may not be practical and restrictions may be placed on future land use. Following decommissioning, for example, some sites may be reused for non-nuclear industrial activities, but not for habitation. Some former uranium mining sites may be released for reuse as nature reserves or for other leisure activities. Both decommissioning and environmental remediation are major industrial projects in which the safety of the workforce, the local public and the environment must be ensured from both radiological and conventional hazards. Hence, an appropriate legal and regulatory framework, as well as proper training for personnel both in implementation and in regulatory oversight are among the necessary preconditions to ensure safety.

  12. Decommissioning and environmental remediation: An overview

    International Nuclear Information System (INIS)

    Chatzis, Irena

    2016-01-01

    The objective in both decommissioning and environmental remediation is to lower levels of residual radioactivity enough that the sites may be used for any purpose, without restriction. In some cases, however, this may not be practical and restrictions may be placed on future land use. Following decommissioning, for example, some sites may be reused for non-nuclear industrial activities, but not for habitation. Some former uranium mining sites may be released for reuse as nature reserves or for other leisure activities. Both decommissioning and environmental remediation are major industrial projects in which the safety of the workforce, the local public and the environment must be ensured from both radiological and conventional hazards. Hence, an appropriate legal and regulatory framework, as well as proper training for personnel both in implementation and in regulatory oversight are among the necessary preconditions to ensure safety

  13. Integrated approach to planning the remediation of sites undergoing decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Responding to the needs of Member States, the IAEA has launched an environmental remediation guidance initiative dealing with the issues of radioactive contamination world wide. Its aim is to collate and disseminate information concerning the key issues affecting environmental remediation of contaminated sites. This IAEA initiative includes the development of documents that report on remediation technologies available, best practices, and information and guidance concerning (a) Strategy development for environmental remediation; (b) Characterization and remediation of contaminated sites and contaminated groundwater; (c) Management of waste and residues from mining and milling of uranium and thorium; (d) Decommissioning of buildings; (e) A database for contaminated sites. The subject of this present report concerns the integration of decommissioning and remediation activities at sites undergoing decommissioning and this fits within the first category of guidance documentation (strategy development). This document addresses key strategic planning issues. It is intended to provide practical advice and complement other reports that focus on decommissioning and remediation at nuclear facilities. The document is designed to encourage site remediation activities that take advantage of synergies with decommissioning in order to reduce the duplication of effort by various parties and minimize adverse impacts on human health, the environment, and costs through the transfer of experience and knowledge. To achieve this objective, the document is designed to help Member States gain perspective by summarizing available information about synergies between decommissioning and remediation, strategic planning and project management and planning tools and techniques to support decision making and remediation. Case studies are also presented as to give concrete examples of the theoretical elements elaborated in the documents. This publication investigates the potential synergies

  14. Yakima/Klickitat Fisheries Project: Short Project Overview of Spring Chinook Salmon Supplementation in the Upper Yakima Basin; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fast, David E.; Bosch, William J.

    2005-09-01

    The Yakima/Klickitat Fisheries Project (YKFP) is on schedule to ascertain whether new artificial production techniques can be used to increase harvest and natural production of spring Chinook salmon while maintaining the long-term genetic fitness of the fish population being supplemented and keeping adverse genetic and ecological interactions with non-target species or stocks within acceptable limits. The Cle Elum Supplementation and Research Facility (CESRF) collected its first spring chinook brood stock in 1997, released its first fish in 1999, and age-4 adults have been returning since 2001. In these initial years of CESRF operation, recruitment of hatchery origin fish has exceeded that of fish spawning in the natural environment, but early indications are that hatchery origin fish are not as successful at spawning in the natural environment as natural origin fish when competition is relatively high. When competition is reduced, hatchery fish produced similar numbers of progeny as their wild counterparts. Most demographic variables are similar between natural and hatchery origin fish, however hatchery origin fish were smaller-at-age than natural origin fish. Long-term fitness of the target population is being evaluated by a large-scale test of domestication. Slight changes in predation vulnerability and competitive dominance, caused by domestication, were documented. Distribution of spawners has increased as a result of acclimation site location and salmon homing fidelity. Semi-natural rearing and predator avoidance training have not resulted in significant increases in survival of hatchery fish. However, growth manipulations in the hatchery appear to be reducing the number of precocious males produced by the YKFP and consequently increasing the number of migrants. Genetic impacts to non-target populations appear to be low because of the low stray rates of YKFP fish. Ecological impacts to valued non-target taxa were within containment objectives or impacts that

  15. Optimal Conventional and Semi-Natural Treatments for the Upper Yakima Spring Chinook Salmon Supplementation Project, Treatment Definitions and Descriptions, and Biological Specifications for Facility Design, Final Report 1999

    International Nuclear Information System (INIS)

    Hager, Robert C.; Costello, Ronald J.

    1999-01-01

    This report describes the Yakima Fisheries Project facilities (Cle Elum Hatchery and acclimation satellites) which provide the mechanism to conduct state-of-the-art research for addressing questions about spring chinook supplementation strategies. The definition, descriptions, and specifications for the Yakima spring chinook supplementation program permit evaluation of alternative fish culture techniques that should yield improved methods and procedures to produce wild-like fish with higher survival that can be used to rebuild depleted spring chinook stocks of the Columbia River Basin. The definition and description of three experimental treatments, Optimal Conventional (OCT), Semi-Natural (SNT), Limited Semi-Natural (LSNT), and the biological specifications for facilities have been completed for the upper Yakima spring chinook salmon stock of the Yakima Fisheries Project. The task was performed by the Biological Specifications Work Group (BSWG) represented by Yakama Indian Nation, Washington Department of Fish and Wildlife, National Marine Fisheries Service, and Bonneville Power Administration. The control and experimental variables of the experimental treatments (OCT, SNT, and LSNT) are described in sufficient detail to assure that the fish culture facilities will be designed and operated as a production scale laboratory to produce and test supplemented upper Yakima spring chinook salmon. Product specifications of the treatment groups are proposed to serve as the generic templates for developing greater specificity for measurements of product attributes. These product specifications will be used to monitor and evaluate treatment effects, with respect to the biological response variables (post release survival, long-term fitness, reproductive success and ecological interactions)

  16. Optimal Conventional and Semi-Natural Treatments for the Upper Yakima Spring Chinook Salmon Supplementation Project; Treatment Definitions and Descriptions and Biological Specifications for Facility Design, 1995-1999 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hager, Robert C. (Hatchery Operations Consulting); Costello, Ronald J. (Mobrand Biometrics, Inc., Vashon Island, WA)

    1999-10-01

    This report describes the Yakima Fisheries Project facilities (Cle Elum Hatchery and acclimation satellites) which provide the mechanism to conduct state-of-the-art research for addressing questions about spring chinook supplementation strategies. The definition, descriptions, and specifications for the Yakima spring chinook supplementation program permit evaluation of alternative fish culture techniques that should yield improved methods and procedures to produce wild-like fish with higher survival that can be used to rebuild depleted spring chinook stocks of the Columbia River Basin. The definition and description of three experimental treatments, Optimal Conventional (OCT), Semi-Natural (SNT), Limited Semi-Natural (LSNT), and the biological specifications for facilities have been completed for the upper Yakima spring chinook salmon stock of the Yakima Fisheries Project. The task was performed by the Biological Specifications Work Group (BSWG) represented by Yakama Indian Nation, Washington Department of Fish and Wildlife, National Marine Fisheries Service, and Bonneville Power Administration. The control and experimental variables of the experimental treatments (OCT, SNT, and LSNT) are described in sufficient detail to assure that the fish culture facilities will be designed and operated as a production scale laboratory to produce and test supplemented upper Yakima spring chinook salmon. Product specifications of the treatment groups are proposed to serve as the generic templates for developing greater specificity for measurements of product attributes. These product specifications will be used to monitor and evaluate treatment effects, with respect to the biological response variables (post release survival, long-term fitness, reproductive success and ecological interactions).

  17. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1984-12-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project FY 1984 major accomplishments are summarized. Twenty-five percent of the processing site remedial actions at Canonsburg, PA, were completed. Remedial action on 118 vicinity properties at four designated locations were initiated and survey and inclusion activities on a total of 420 vicinity properties were completed. The Environmental Impact Statement (EIS) for Salt Lake City, UT, and the Environmental Assessment (EA) for Shiprock, NM were published, and the preliminary draft EIS for Durango, CO, was prepared. Remedial Action Plans (RAPs) for Salt Lake City, UT, and Shiprock, NM were completed, and draft RAPs for Gunnison, CO, and Riverton, WY were prepared. Cooperative agreements with Oregon, Wyoming, and South Dakota were executed, and the Utah cooperative agreement was modified to assign the construction management responsibility to the state. An Interagency Agreement with TVA for disposal of the Edgemont vicinity property material was executed

  18. USGS Activities at Lake Roosevelt and the Upper Columbia River

    Science.gov (United States)

    Barton, Cynthia; Turney, Gary L.

    2010-01-01

    Lake Roosevelt (Franklin D. Roosevelt Lake) is the impoundment of the upper Columbia River behind Grand Coulee Dam, and is the largest reservoir within the Bureau of Reclamation's Columbia Basin Project (CBP). The reservoir is located in northeastern Washington, and stretches 151 miles from Grand Coulee Dam north to the Canadian border. The 15-20 miles of the Columbia River downstream of the border are riverine and are under small backwater effects from the dam. Grand Coulee Dam is located on the mainstem of the Columbia River about 90 miles northwest of Spokane. Since the late 1980s, trace-element contamination has been known to be widely present in Lake Roosevelt. Trace elements of concern include arsenic, cadmium, copper, lead, mercury, and zinc. Contaminated sediment carried by the Columbia River is the primary source of the widespread occurrence of trace-element enrichment present in Lake Roosevelt. In 2001, the U.S. Environmental Protection Agency (EPA) initiated a preliminary assessment of environmental contamination of the Lake Roosevelt area (also referred to as Upper Columbia River, UCR site, or UCR/LR site) and has subsequently begun remedial investigations of the UCR site.

  19. Remediating Remediation: From Basic Writing to Writing across the Curriculum

    Science.gov (United States)

    Faulkner, Melissa

    2013-01-01

    This article challenges faculty members and administrators to rethink current definitions of remediation. First year college students are increasingly placed into basic writing courses due to a perceived inability to use English grammar correctly, but it must be acknowledged that all students will encounter the need for remediation as they attempt…

  20. THE TAOS PROJECT: UPPER BOUNDS ON THE POPULATION OF SMALL KUIPER BELT OBJECTS AND TESTS OF MODELS OF FORMATION AND EVOLUTION OF THE OUTER SOLAR SYSTEM

    International Nuclear Information System (INIS)

    Bianco, F. B.; Zhang, Z.-W.; King, S.-K.; Wang, J.-H.; Lee, T.; Lin, H.-C.; Lehner, M. J.; Mondal, S.; Giammarco, J.; Holman, M. J.; Alcock, C.; Coehlo, N. K.; Axelrod, T.; Byun, Y.-I.; Kim, D.-W.; Chen, W. P.; Cook, K. H.; Dave, R.; De Pater, I.; Lissauer, J. J.

    2010-01-01

    We have analyzed the first 3.75 years of data from the Taiwanese American Occultation Survey (TAOS). TAOS monitors bright stars to search for occultations by Kuiper Belt objects (KBOs). This data set comprises 5 x 10 5 star hours of multi-telescope photometric data taken at 4 or 5 Hz. No events consistent with KBO occultations were found in this data set. We compute the number of events expected for the Kuiper Belt formation and evolution models of Pan and Sari, Kenyon and Bromley, Benavidez and Campo Bagatin, and Fraser. A comparison with the upper limits we derive from our data constrains the parameter space of these models. This is the first detailed comparison of models of the KBO size distribution with data from an occultation survey. Our results suggest that the KBO population is composed of objects with low internal strength and that planetary migration played a role in the shaping of the size distribution.

  1. Soil and its selected properties on the example of an individual project for the grade 1 students of upper secondary school

    Science.gov (United States)

    Krzeczkowska, Małgorzata

    2014-05-01

    According to the requirements of the new core curriculum for Chemistry, students shall acquire knowledge through research and use the acquired chemical knowledge in their everyday life. However, in the recommended conditions and mode of implementation of the curriculum it is confirmed, that students' autonomous observation constitutes a basis for experiencing, inferences, analysis, and generalisations of phenomena [1]. It is obvious that teachers should create proper didactic situations, during which school students have a possibility to develop attitudes, skills and competences. More about competences we can find in the recommendations of the European Parliament and of the Council of 18 December 2006 on key competences for lifelong learning [2]. The detailed content of the core curriculum for the subject of chemistry at the fourth stage of education (basic level), we read: "4. Chemistry of soil. Student: 1) explains what the sorption properties of the soil are; plans and performs .... study of the sorption properties of the soil. " In the school year 2012/2013 chemistry teachers decided to offer students of a first-class to be involved in the project "Soil in the chemist's eye." It was considered that the method of the project is known from lower secondary school level and the teacher will have an opportunity to recognize students, who in the future, will choose the class with advanced chemistry program and determine the level of their skills, in particular the research skills. What we can offer to students does not necessarily take place in a well-equipped chemical laboratory. On the contrary, this process should be based on the well-known school subjects items, articles, objects and phenomena, which students meet in everyday life. The well-chosen methodologies and ways of showing the world will be, more understandable and skills will become a permanent part of the students, knowledge. Project characterization: a) The proposed project is problem-oriented, in

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  3. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  4. Remedial action technology - arid

    International Nuclear Information System (INIS)

    Hakonson, T.E.; DePoorter, G.L.; Nyhan, J.W.; Perkins, B.A.; Lane, L.J.

    1982-01-01

    A summary is presented of the low-level waste remedial action program at Los Alamos. The experimental design and progress is described for the experiments on second generation intrusion barriers, subsidence effects on SLB components, moisture cycling effects on chemical transport, and erosion control methodologies. The soil moisture data from the bio-intrusion and moisture cycling experiments both demonstrate the overwhelming importance of vegetation in minimizing infiltration of water through trench covers and backfill. Evaporation, as a water loss component in trench covers, is only effective in reducing soil moisture within 40 cm of the trench cover surface. Moisture infiltrating past the zone of evaporation in unvegetated or poorly vegetated trench covers is in storage and accumulates until drainage out of the soil profile occurs. Judicious selection of vegetation species for revegetating a low-level waste site may prevent infiltration of moisture into the trench and, when coupled with other design features (i.e. trench cover slope, tilling and seeding practice), may greatly reduce problems with erosion. Standard US Department of Agriculture erosion plots, when coupled with a state-of-the-art water balance and erosion model (CREAMS) promises to be highly useful in screening proposed remedial action cover designs for low-level waste sites. The erosion plot configuration allows for complete accounting of the water balance in a soil profile. This feature enables the user to optimize cover designs to minimize erosion and infiltration of water into the trench

  5. Lasagna trademark soil remediation

    International Nuclear Information System (INIS)

    1996-04-01

    Lasagna trademark is an integrated, in situ remediation technology being developed which remediates soils and soil pore water contaminated with soluble organic compounds. Lasagna trademark is especially suited to sites with low permeability soils where electroosmosis can move water faster and more uniformly than hydraulic methods, with very low power consumption. The process uses electrokinetics to move contaminants in soil pore water into treatment zones where the contaminants can be captured and decomposed. Initial focus is on trichloroethylene (TCE), a major contaminant at many DOE and industrial sites. Both vertical and horizontal configurations have been conceptualized, but fieldwork to date is more advanced for the vertical configuration. Major features of the technology are electrodes energized by direct current, which causes water and soluble contaminants to move into or through the treatment layers and also heats the soil; treatment zones containing reagents that decompose the soluble organic contaminants or adsorb contaminants for immobilization or subsequent removal and disposal; and a water management system that recycles the water that accumulates at the cathode (high pH) back to the anode (low pH) for acid-base neutralization. Alternatively, electrode polarity can be reversed periodically to reverse electroosmotic flow and neutralize pH

  6. Remediation of Site of Decommissioning Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Danilovich, A.S.; Ivanov, O.P.; Lemus, A.V.; Pavlenko, V.I.; Potapov, V.N.; Semenov, S.G.; Shisha, A.D.; Chesnokov, A.V. [National Research Center ' Kurchatov Institute' , 123182, Moscow (Russian Federation)

    2014-07-01

    In the world the most widespread method of soil decontamination consists of removing the contaminated upper layer and sending it for long-term controlled storage. However, implementation of this soil cleanup method for remediation of large contaminated areas would involve high material and financial expenditures, because it produces large amounts of radioactive waste demanding removal to special storage sites. Contaminated soil extraction and cleanup performed right on the spot of remediation activities represents a more advanced and economically acceptable method. Radiological separation of the radioactive soil allows reducing of amount of radwaste. Studies performed during the liquidation of the Chernobyl accident consequences revealed that a considerable fraction of radioactivity is accumulated in minute soil grains. So, the separation of contaminated soil by size fractions makes it possible to extract and concentrate the major share of radioactivity in the fine fraction. Based on these researches water gravity separation technology was proposed by Bochvar Institute. The method extracts the fine fraction from contaminated soil. Studies carried out by Bochvar Institute experts showed that, together with the fine fraction (amounting to 10-20% of the initial soil), this technology can remove up to 85-90% of contaminating radionuclides. The resulting 'dirty' soil fraction could be packaged into containers and removed as radwaste, and decontaminated fractions returned back to their extraction site. Use of radiological and water gravity separations consequently increases the productivity of decontamination facility. Efficiency of this technology applied for contaminated soil cleanup was confirmed in the course of remediation of the contaminated territories near decommissioning research reactor in the Kurchatov Institute. For soil cleaning purposes, a special facility implementing the technology of water gravity separation and radiometric monitoring of soil

  7. Surface water management at a mixed waste remediation site

    International Nuclear Information System (INIS)

    Schlotzhauer, D.S.; Warbritton, K.R.

    1991-01-01

    The Weldon Spring Remedial Action Project (WSSRAP) deals with chemical and radiological contaminants. MK-Ferguson Company is managing the project under contract with the US Department of Energy. Remedial activities include demolishing buildings, constructing material storage and staging areas, excavating and consolidating waste materials, and treating and disposing of the materials in a land disposal facility. Due to the excavation and construction required during remediation, a well-planned surface water management system is essential. Planning involves characterization of source areas and surface water transport mechanisms and identification of applicable regulations. System components include: erosion control sediment control, flow attenuation, and management of contaminated water. Combinations of these components may be utilized during actual construction and remediation to obtain optimum control. Monitoring is performed during implementation in order to assess the effectiveness of control measures. This management scheme provides for comprehensive management of surface water at this site by providing control and/or treatment to appropriate standards. Although some treatment methodologies for contaminated water are specific to site contaminants, this comprehensive program provides a management approach which is applicable to many remedial projects in order to minimize contaminant release and meet Clean Water Act requirements

  8. Pilot remediation of sediment from the Petroleum harbour in Amsterdam

    International Nuclear Information System (INIS)

    Hakstege, A.L.; Geldermalsen, L.A. van

    1998-01-01

    The Petroleum Harbour project is the third pilot remediation, which was carried out within the framework of POSW (the national development programme for treatment processes of polluted sediments). The main objectives of the pilot remediation are: to demonstrate the biological treatment of dredged materials on a practical scale; and to gain knowledge and experience for the future remediation of the total Petroleum harbour. A strict tender procedure was carefully executed in order to select the most effective and 'state of the art' biodegradation technology. The selected remediation chain was a combination of 'standard' soil treatment technology and newly developed biotechnology. Dredging, biotechnological treatment and the effects of the remediation on the environment were monitored in detail. The quality of the treated sand fraction complied with the Dutch standards for re-use and was actually applied in a project of Rijkswaterstaat. Biodegradation resulted in a substantial decrease of the oil and PAH's contents, but due to the lack of breakdown of a few high-molecular PAH's, the quality requirements of the contract were not achieved. It is concluded that the two main objectives of the project have been attained. Finally some recommendations for the future clean-up of the Petroleum harbour are given. (author)

  9. Herbal remedies and supplements for weight loss

    Science.gov (United States)

    Weight loss - herbal remedies and supplements; Obesity - herbal remedies; Overweight - herbal remedies ... health care provider. Nearly all over-the-counter supplements with claims of weight-loss properties contain some ...

  10. Electrodialytic remediation of solid waste

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Ottosen, Lisbeth M.; Karlsmose, Bodil

    1996-01-01

    Electrodialytic remediation of heavy metal polluted solid waste is a method that combines the technique of electrodialysis with the electromigration of ions in the solid waste. Results of laboratory scale remediation experiments of soil are presented and considerations are given on how to secure...

  11. Environmental Impact and Remediation of Uranium Tailings and Waste Rock Dumps at Mailuu-Suu in Kyrgyzstan

    International Nuclear Information System (INIS)

    Kunze, C.; Walter, U.; Wagner, F.; Schmidt, P.; Barnekow, U.; Gruber, A.

    2011-01-01

    This paper describes the environmental situation in the former uranium mining and milling region of Mailuu-Suu (Kyrgyzstan), the approach to environmental remediation of the waste facilities (tailings ponds and waste dumps) and the results achieved so far. It starts with an outline of the history of the environmental remediation project which has received international attention and is seen as a pilot project for further remediation activities of former uranium mining and milling sites in the region. Apart from technical aspects, the paper draws conclusions with respect to the administrative environment, institutional capacity building and the local availability of resources needed to successfully implement a complex remediation project. (author)

  12. Gunnar uranium mine environmental remediation - Northern Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    Muldoon, Joe; Yankovich, Tamara; Schramm, Laurier L. [Saskatchewan Research Council, Saskatoon, SK (Canada)

    2013-07-01

    The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22. largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which

  13. Floodplain Assessment for the Upper Cañon de Valle Watershed Enhancement Project in Technical Area 16 at Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hathcock, Charles Dean [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Keller, David Charles [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sartor, Karla A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-04

    This floodplain assessment was prepared in accordance with 10 Code of Federal Regulations (CFR) 1022 Compliance with Floodplain and Wetland Environmental Review Requirements, which was promulgated to implement the U.S. Department of Energy (DOE) requirements under Executive Order 11988 Floodplain Management and Executive Order 11990 Wetlands Protection. According to 10 CFR 1022, a 100-year floodplain is defined as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands.” In this action, DOE is proposing to control the run-on of storm water by slowing water velocity and managing sediments from the upper portions of the Cañon de Valle watershed on Los Alamos National Laboratory (LANL) property with a number of new watershed controls near and within the 100-year floodplain (hereafter floodplain). The proposed work will comply with requirements under the Settlement Agreement and Stipulated Final Compliance Order (Settlement Agreement) Number HWB-14-20.

  14. A comparison of pre- and post-remediation water quality, Mineral Creek, Colorado

    Science.gov (United States)

    Runkel, R.L.; Bencala, K.E.; Kimball, B.A.; Walton-Day, K.; Verplanck, P.L.

    2009-01-01

    Pre- and post-remediation data sets are used herein to assess the effectiveness of remedial measures implemented in the headwaters of the Mineral Creek watershed, where contamination from hard rock mining has led to elevated metal concentrations and acidic pH. Collection of pre- and post-remediation data sets generally followed the synoptic mass balance approach, in which numerous stream and inflow locations are sampled for the constituents of interest and estimates of streamflow are determined by tracer dilution. The comparison of pre- and post-remediation data sets is confounded by hydrologic effects and the effects of temporal variation. Hydrologic effects arise due to the relatively wet conditions that preceded the collection of pre-remediation data, and the relatively dry conditions associated with the post-remediation data set. This difference leads to a dilution effect in the upper part of the study reach, where pre-remediation concentrations were diluted by rainfall, and a source area effect in the lower part of the study reach, where a smaller portion of the watershed may have been contributing constituent mass during the drier post-remediation period. A second confounding factor, temporal variability, violates the steady-state assumption that underlies the synoptic mass balance approach, leading to false identification of constituent sources and sinks. Despite these complications, remedial actions completed in the Mineral Creek headwaters appear to have led to improvements in stream water quality, as post-remediation profiles of instream load are consistently lower than the pre-remediation profiles over the entire study reach for six of the eight constituents considered (aluminium, arsenic, cadmium, copper, iron, and zinc). Concentrations of aluminium, cadmium, copper, lead, and zinc remain above chronic aquatic-life standards, however, and additional remedial actions may be needed. Future implementations of the synoptic mass balance approach should be

  15. Cognitive Remediation in Schizophrenia

    Directory of Open Access Journals (Sweden)

    Joana Vieira

    2014-06-01

    Full Text Available Several reviews of the literature support the idea that cognitive deficits observed in a large percentage of patients with schizophrenia are responsible for the cognitive performance deficit and functional disability associated with the disease. The grow- ing importance of neurocognition in Psychiatry, especially with regard to planning strategies and rehabilitative therapies to improve the prognosis of patients contrib- utes to the interest of achieving this literature review on cognitive rehabilitation in schizophrenia. In this work, drawn from research in the areas of schizophrenia, cog- nition, cognitive rehabilitation and cognitive remediation (2000-2012 through PubMed and The Cochrane Collaboration, it is intended, to describe the types of psychological and behavioral therapies recommended in the treatment of cognitive disabilities in patients diagnosed with schizophrenia. This review will also highlight the clinical and scientific evidence of each of these therapies, as their effect on cognitive performance, symptoms and functionality in patients with schizophrenia.

  16. Chemical Remediation of Nickel(II) Waste: A Laboratory Experiment for General Chemistry Students

    Science.gov (United States)

    Corcoran, K. Blake; Rood, Brian E.; Trogden, Bridget G.

    2011-01-01

    This project involved developing a method to remediate large quantities of aqueous waste from a general chemistry laboratory experiment. Aqueous Ni(II) waste from a general chemistry laboratory experiment was converted into solid nickel hydroxide hydrate with a substantial decrease in waste volume. The remediation method was developed for a…

  17. Rail transportation of Fernald remediation waste

    International Nuclear Information System (INIS)

    Fellman, R.T.; Lojek, D.A.; Motl, G.P.; Weddendorf, W.K.

    1995-01-01

    Remediation of the Department of Energy (DOE) Fernald site located north of Cincinnati will generate large quantities of low-level radwaste. This volume includes approximately 1,050,000 tons of material to be removed from eight waste pits comprising Operable Unit 1 (OU-1). The remedial alternative selected includes waste material excavation, drying and transportation by rail to a burial site in the arid west for disposal. Rail transportation was selected not only because rail transportation is safer than truck transportation, but also because of the sheer magnitude of the project and the availability of bulk rail car unloading facilities at a representative disposal site. Based upon current waste quantity estimates as presented in the Feasibility Study for OUI, a fully-loaded 47-car unit train would depart the Fernald site weekly for five years. This paper illustrates the steps taken to obtain agency and public acceptance of the Record of Decision for the remedy which hinged on rail transportation. A preliminary, but detailed, rail transportation plan was prepared for the project to support a series of CERCLA public meetings conducted in late 1994. Some of the major issues addressed in the plan included the following: (1) Scope of project leading to selection of rail transportation; (2) Waste classification; (3) Rail Company overview; (4) Train configuration and rail car selection; (5) Routing; (6) Safety; (7) Prior Notification Requirements (8) Emergency Response. A series of three public meetings identified a number of issues of prime concern to Fernald stakeholders. Following resolution of these issues during the public comment period, a Record of Decision (ROD) approving implementation of the rail transportation strategy was approved pending incorporation of EPA and State of Ohio comments on December 22, 1994

  18. Simulation of saltwater movement in the Upper Floridan aquifer in the Savannah, Georgia-Hilton Head Island, South Carolina, area, predevelopment-2004, and projected movement for 2000 pumping conditions

    Science.gov (United States)

    Provost, Alden M.; Payne, Dorothy F.; Voss, Clifford I.

    2006-01-01

    A digital model was developed to simulate ground-water flow and solute transport for the Upper Floridan aquifer in the Savannah, Georgia-Hilton Head Island, South Carolina, area. The model was used to (1) simulate trends of saltwater intrusion from predevelopment to the present day (1885-2004), (2) project these trends from the present day into the future, and (3) evaluate the relative influence of different assumptions regarding initial and boundary conditions and physical properties. The model is based on a regional, single-density ground-water flow model of coastal Georgia and adjacent parts of South Carolina and Florida. Variable-density ground-water flow and solute transport were simulated using the U.S. Geological Survey finite-element, variable-density solute-transport simulator SUTRA, 1885-2004. The model comprises seven layers: the surficial aquifer system, the Brunswick aquifer system, the Upper Floridan aquifer, the Lower Floridan aquifer, and the intervening confining units. The model was calibrated to September 1998 water levels, for single-density freshwater conditions, then refined using variable density and chloride concentration to give a reasonable match to the trend in the chloride distribution in the Upper Floridan aquifer inferred from field measurements of specific conductance made during 2000, 2002, 2003, and 2004. The model was modified to simulate solute transport by allowing saltwater to enter the system through localized areas near the northern end of Hilton Head Island, at Pinckney Island, and near the Colleton River, and was calibrated to match chloride concentrations inferred from field measurements of specific conductance. This simulation is called the 'Base Case.'

  19. Inclusion of social indicators in decision support tools for the selection of sustainable site remediation options.

    Science.gov (United States)

    Cappuyns, Valérie

    2016-12-15

    Sustainable remediation requires a balanced decision-making process in which environmental, economic and social aspects of different remediation options are all considered together and the optimum remediation solution is selected. More attention has been paid to the evaluation of environmental and economic aspects, in particular to reduce the human and environmental risks and the remediation costs, to the exclusion of social aspects of remediation. This paper investigates how social aspects are currently considered in sustainability assessments of remediation projects. A selection of decision support tools (DSTs), used for the sustainability assessment of a remediation project, is analyzed to define how social aspects are considered in those tools. The social indicator categories of the Sustainable Remediation Forum - United Kingdom (SuRF-UK), are used as a basis for this evaluation. The consideration of social aspects in the investigated decision support tools is limited, but a clear increase is noticed in more recently developed tools. Among the five social indicator categories defined by SuRF-UK to facilitate a holistic consideration of social aspects of a remediation project only "Human health and safety" is systematically taken into account. "Neighbourhood and locality" is also often addressed, mostly emphasizing the potential disturbance caused by the remediation activities. However, the evaluation of 'Ethics and Equality', Communities and community involvement', and 'Uncertainty and evidence' is often neglected. Nevertheless, concrete examples can be found in some of the investigated tools. Specific legislation, standard procedures, and guidelines that have to be followed in a region or country are mainly been set up in the context of protecting human and ecosystem health, safety and prevention of nuisance. However, they sometimes already include some of the aspects addressed by the social indicators. In this perspective the use of DST to evaluate the

  20. The association between change in body mass index and upper aerodigestive tract cancers in the ARCAGE project: multicenter case-control study.

    LENUS (Irish Health Repository)

    Park, Sungshim Lani

    2011-03-15

    Previous studies reported an inverse relationship between body mass index (BMI) and upper aerodigestive tract (UADT) cancers. Examining change in BMI over time may clarify these previous observations. We used data from 2,048 cases and 2,173 hospital- and population-based controls from ten European countries (alcohol-related cancers and genetic susceptibility in Europe study) to investigate the relationship with BMI and adult change in BMI on UADT cancer risk. Odds ratios (ORs) and 95% confidence intervals (CIs) were estimated for associations between BMI at three time intervals and BMI change on UADT cancer development, adjusting for center, age, sex, education, fruit and vegetable intake, smoking and alcohol consumption. We found an inverse relationship between UADT cancers and BMI at time of interview and 2 years before interview. No association was found with BMI at 30 years of age. Regarding BMI change between age 30 and 2 years before interview, BMI decrease (BMI change <-5%) vs. BMI stability (-5% ≤ BMI change <5%) showed no overall association with UADT cancers (OR = 1.15; 95% CI = 0.89, 1.49). An increase in BMI (BMI change ≥+5%) was inversely associated with UADT cancers (OR = 0.74; 95% CI = 0.62, 0.89). BMI gain remained inversely associated across all subsites except for esophageal cancer. When stratified by smoking or by drinking, association with BMI gain was detected only in drinkers and smokers. In conclusion, BMI gain is inversely associated with UADT cancers. These findings may be influenced by smoking and\\/or drinking behaviors and\\/or the development of preclinical UADT cancers and should be corroborated in studies of a prospective nature.

  1. The atmospheric implications of radiation belt remediation

    Directory of Open Access Journals (Sweden)

    C. J. Rodger

    2006-08-01

    Full Text Available High altitude nuclear explosions (HANEs and geomagnetic storms can produce large scale injections of relativistic particles into the inner radiation belts. It is recognised that these large increases in >1 MeV trapped electron fluxes can shorten the operational lifetime of low Earth orbiting satellites, threatening a large, valuable population. Therefore, studies are being undertaken to bring about practical human control of the radiation belts, termed "Radiation Belt Remediation" (RBR. Here we consider the upper atmospheric consequences of an RBR system operating over either 1 or 10 days. The RBR-forced neutral chemistry changes, leading to NOx enhancements and Ox depletions, are significant during the timescale of the precipitation but are generally not long-lasting. The magnitudes, time-scales, and altitudes of these changes are no more significant than those observed during large solar proton events. In contrast, RBR-operation will lead to unusually intense HF blackouts for about the first half of the operation time, producing large scale disruptions to radio communication and navigation systems. While the neutral atmosphere changes are not particularly important, HF disruptions could be an important area for policy makers to consider, particularly for the remediation of natural injections.

  2. The atmospheric implications of radiation belt remediation

    Directory of Open Access Journals (Sweden)

    C. J. Rodger

    2006-08-01

    Full Text Available High altitude nuclear explosions (HANEs and geomagnetic storms can produce large scale injections of relativistic particles into the inner radiation belts. It is recognised that these large increases in >1 MeV trapped electron fluxes can shorten the operational lifetime of low Earth orbiting satellites, threatening a large, valuable population. Therefore, studies are being undertaken to bring about practical human control of the radiation belts, termed "Radiation Belt Remediation" (RBR. Here we consider the upper atmospheric consequences of an RBR system operating over either 1 or 10 days. The RBR-forced neutral chemistry changes, leading to NOx enhancements and Ox depletions, are significant during the timescale of the precipitation but are generally not long-lasting. The magnitudes, time-scales, and altitudes of these changes are no more significant than those observed during large solar proton events. In contrast, RBR-operation will lead to unusually intense HF blackouts for about the first half of the operation time, producing large scale disruptions to radio communication and navigation systems. While the neutral atmosphere changes are not particularly important, HF disruptions could be an important area for policy makers to consider, particularly for the remediation of natural injections.

  3. Object reasoning for waste remediation

    International Nuclear Information System (INIS)

    Pennock, K.A.; Bohn, S.J.; Franklin, A.L.

    1991-08-01

    A large number of contaminated waste sites across the United States await size remediation efforts. These sites can be physically complex, composed of multiple, possibly interacting, contaminants distributed throughout one or more media. The Remedial Action Assessment System (RAAS) is being designed and developed to support decisions concerning the selection of remediation alternatives. The goal of this system is to broaden the consideration of remediation alternatives, while reducing the time and cost of making these considerations. The Remedial Action Assessment System is a hybrid system, designed and constructed using object-oriented, knowledge- based systems, and structured programming techniques. RAAS uses a combination of quantitative and qualitative reasoning to consider and suggest remediation alternatives. The reasoning process that drives this application is centered around an object-oriented organization of remediation technology information. This paper describes the information structure and organization used to support this reasoning process. In addition, the paper describes the level of detail of the technology related information used in RAAS, discusses required assumptions and procedural implications of these assumptions, and provides rationale for structuring RAAS in this manner. 3 refs., 3 figs

  4. French uranium mining sites remediation

    International Nuclear Information System (INIS)

    Roche, M.

    2002-01-01

    Following a presentation of the COGEMA's general policy for the remediation of uranium mining sites and the regulatory requirements, the current phases of site remediation operations are described. Specific operations for underground mines, open pits, milling facilities and confining the milled residues to meet long term public health concerns are detailed and discussed in relation to the communication strategies to show and explain the actions of COGEMA. A brief review of the current remediation situation at the various French facilities is finally presented. (author)

  5. Remediation of the Lermontov mining site in Russia

    International Nuclear Information System (INIS)

    Krotkov, V.V.

    2001-01-01

    For 40 years, uranium mines were operated in the direct vicinity of the spas of Mineralnyje Wody, Pjatigorsk, Kislowodsk, Jessentuki and Zheleznowodsk by the Almaz company. Now that the mines have been abandoned, the spa region is surrounded by contaminated land. Remedial measures are projected in accordance with radiation protection standards [de

  6. Remediation of Legacy Arsenic Mining Areas in Yunnan Province, China

    Directory of Open Access Journals (Sweden)

    Ian H. von Lindern

    2011-01-01

    Conclusions. The success of the demonstration project was recognized and has provided direction and momentum for a wider effort by the Province to address mining pollution and water contamination challenges. It demonstrates the success of using known techniques for environmental remediation in the US, with local partners in China responding to their communities’ health and environmental problems.

  7. Remedial design and remedial action guidance for the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-10-01

    The US Department of Energy, Idaho Operations Office (DOE-ID), the US Environmental Protection Agency, Region X (EPA), and the Idaho Department of Health and Welfare (IDHW) have developed this guidance on the remedial design and remedial action (RD/RA) process. This guidance is applicable to activities conducted under the Idaho National Engineering Laboratory (INEL) Federal Facility Agreement and Consent Order (FFA/CO) and Action Plan. The INEL FFA/CO and Action Plan provides the framework for performing environmental restoration according to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The guidance is intended for use by the DOE-ID, the EPA, and the IDHW Waste Area Group (WAG) managers and others involved in the planning and implementation of CERCLA environmental restoration activities. The scope of the guidance includes the RD/RA strategy for INEL environmental restoration projects and the approach to development and review of RD/RA documentation. Chapter 2 discusses the general process, roles and responsibilities, and other elements that define the RD/RA strategy. Chapters 3 through 7 describe the RD/RA documents identified in the FFA/CO and Action Plan. Chapter 8 provides examples of how this guidance can be applied to restoration projects. Appendices are included that provide excerpts from the FFA/CO pertinent to RD/RA (Appendix A), a applicable US Department of Energy (DOE) orders (Appendix B), and an EPA Engineering ''Data Gaps in Remedial Design'' (Appendix C)

  8. ICDF Complex Remedial Action Report

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  9. Approaches for assessing sustainable remediation

    DEFF Research Database (Denmark)

    Søndergaard, Gitte Lemming; Binning, Philip John; Bjerg, Poul Løgstrup

    Sustainable remediation seeks to reduce direct contaminant point source impacts on the environment, while minimizing the indirect cost of remediation to the environment, society and economy. This paper presents an overview of available approaches for assessing the sustainability of alternative...... remediation strategies for a contaminated site. Most approaches use multi-criteria assessment methods (MCA) to structure a decision support process. Different combinations of environmental, social and economic criteria are employed, and are assessed either in qualitative or quantitative forms with various...... tools such as life cycle assessment and cost benefit analysis. Stakeholder involvement, which is a key component of sustainable remediation, is conducted in various ways. Some approaches involve stakeholders directly in the evaluation or weighting of criteria, whereas other approaches only indirectly...

  10. Plant-based remediation processes

    Energy Technology Data Exchange (ETDEWEB)

    Gupta, Dharmendra Kumar (ed.) [Belgian Nuclear Research Centre (SCK.CEN), Mol (Belgium). Radiological Impact and Performance Assessment Division

    2013-11-01

    A valuable source of information for scientists in the field of environmental pollution and remediation. Describes the latest biotechnological methods for the treatment of contaminated soils. Includes case studies and protocols. Phytoremediation is an emerging technology that employs higher plants for the clean-up of contaminated environments. Basic and applied research have unequivocally demonstrated that selected plant species possess the genetic potential to accumulate, degrade, metabolize and immobilize a wide range of contaminants. The main focus of this volume is on the recent advances of technologies using green plants for remediation of various metals and metalloids. Topics include biomonitoring of heavy metal pollution, amendments of higher uptake of toxic metals, transport of heavy metals in plants, and toxicity mechanisms. Further chapters discuss agro-technological methods for minimizing pollution while improving soil quality, transgenic approaches to heavy metal remediation and present protocols for metal remediation via in vitro root cultures.

  11. Model remediation of contaminated sites as illustrated by the example of the TNT-remediation project Stadtallendorf, Hessen, Germany. Part 1: Final report; Part 2: Documentation and balancing of the measures; Part 3: Documentation of citizens' participation and public relations activities in Stadtallendorf; Modellhafte Sanierung von Altlasten am Beispiel des TNT-Sanierungsprojektes Stadtallendorf/Hessen. T. 1: Abschlussbericht. T. 2: Dokumentation und Bilanzierung von Auswirkungen der Sanierung. T. 3: Dokumentation der Buergerbeteiligung und Oeffentlichkeitsarbeit in Stadtallendorf

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The project comprised the following stages: 1. Development of a technology for purification of soils contaminated with explosives. The process comprised soil washing, hot steam treatment, and thermal treatment of residues; 2. Projecting, construction and two years of operation of a soil purification plant with a rated throughput of 20 t/h and a total throughput of 130,000 t; 3. Remediation of two representative sites on DAG terrain (TNT production chain and filling stations); 4. Verification of the findings in an accompanying scientific programme. The site under investigation was formerly occupied by the Dynamit AG (DAG) Stadtallendorf, where TNT, contaminated waste water and acids were produced, and contamination levels were high in several areas. Today, the area is a residential area. In addition to the investigations described here, the waste water discharge system of the DAG was modernized. [German] Das FuE-Vorhaben Stadtallendorf wurde mit folgender Zielsetzung begonnen: (1) Entwicklung einer geeigneten und moeglichst umweltvertraeglichen Technik zur Reinigung von Boeden mit sprengstoffspezifischen Kontaminationen; hierzu wurde in Anlehnung an die Ausschreibung des Bundes ein kombiniertes Bodenbehandlungsverfahren vorgesehen, das aus folgenden Komponenten bestand: - Bodenwaesche, - Heissdampfbehandlung, - Thermische Reststoffbehandlung. (2) Planung, Bau und zweijaehriger Betrieb einer entsprechenden grosstechnischen Bodenreinigungsanlage (Nenndurchsatz von 20 t/Stunde; Gesamtdurchsatz 130.000 t). (3) Bodensanierung von zwei repraesentativen Arealen im DAG-Gelaende (TNT-Produktionskette und Fuellstellenbetrieb). (4) Absicherung der Ergebnisse in einem wissenschaftlichen Begleitprogramm. Gegenstand der Phase 2 des Vorhabens war der vollstaendige Prozess der Planung und Umsetzung der Sanierung eines (Teils eines) Planungsraumes des Ruestungsaltstandortes Dynamit AG (DAG) Stadtallendorf. Es handelte sich dabei um einen Bereich, der als Standort fuer TNT

  12. A responsible remediation strategy

    International Nuclear Information System (INIS)

    Knowles, C.R.

    1992-01-01

    This paper deals with an approach to cleaning up the residue of 150 years of intense urban and industrial development in the United States. The discussion focuses on several choices and strategies that business can adopt given the existing environmental laws and the socio-economic trends of the 1990's. The thesis of this paper is that the best business strategy for dealing with environmental liabilities is to act affirmatively and aggressively. An aggressive, pro-active approach to environmental remediation liabilities makes good business sense. It allows a company to learn the true size of the problem early. Early assessment and prioritization allows one to control the course and conduct of the cleanup. Early voluntary action is always viewed favorably by agencies. It gives one control over spending patterns which has value in and of itself. Voluntary cleanups are certainly faster and invariably more efficient. And they attain clearly acceptable standards. The volunteering company that takes the lead in a multi-party site finds that the courts are supportive in helping the volunteer collect from recalcitrant polluters. All of these pluses have a direct and positive impact on the bottom line and that means that the aggressive approach is the right thing to do for both stockholders and the communities where a business exists

  13. Opium the Best Remedy

    Directory of Open Access Journals (Sweden)

    Harold Merskey

    2004-01-01

    Full Text Available Sydenham was the leading English physician of the 17th century and probably to the present time. He was using a well tried remedy. It had been known by then for about 4000 years, frequently mentioned by Hippocrates, and recognized in use in medieval Europe where it probably came through Arabic traders and was well established in use in Paris by the 12th century (2. Professional concerns up to the time of Sydenham were not about addiction. As can be seen from his text, they were about whether the drug was available in adequate preparations, whether there was any difference between opium and other narcotics, particularly comparing the natural juice with "its artificial preparations" (1 (all of which he thought to be about equal in effect, whether it was stimulant or restorative and invigorating, and whether it was being properly used for all the conditions in which it could be helpful. Addiction, dependence and insanity are not mentioned, although the fact that it could occasionally promote excitement ("frenzy" was known.

  14. Remediation of uranium impacted sediments in a watercourse

    Energy Technology Data Exchange (ETDEWEB)

    Shephard, Eugene; Walter, Nelson; Downey, Heath [AMEC, Inc., Portland, Maine (United States); Collopy, Peter [AMEC, Inc., San Diego, California (United States); Conant, John [ABB, Inc., Windsor, Connecticut (United States)

    2013-07-01

    In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work located in Windsor, Connecticut, USA. Radiological contaminants consisted primarily of high enriched uranium (HEU). Other radionuclides encountered in relatively minor amounts in certain areas of the clean-up included Co-60, Cs- 137, Ra-226, Th-232 and low enriched uranium (LEU).Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. (authors)

  15. Tank waste remediation system retrieval and disposal mission waste feed delivery plan

    International Nuclear Information System (INIS)

    Potter, R.D.

    1998-01-01

    This document is a plan presenting the objectives, organization, and management and technical approaches for the Waste Feed Delivery (WFD) Program. This WFD Plan focuses on the Tank Waste Remediation System (TWRS) Project's Waste Retrieval and Disposal Mission

  16. Remediation of contaminated areas. An overview of international guidance

    DEFF Research Database (Denmark)

    Jensen, Per Hedemann

    1999-01-01

    techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps:-characterisation of relevant contaminated sites -identification and characterisation of relevant...... contaminated with radioactive materials as a result of the operation of these installations. The areasconsidered for remedial measures include contaminated land areas, rivers and sediments in rivers, lakes, and sea areas. Criteria for clean-up of contaminated land and criteria for protection of the public...

  17. Phyto-remediation of contaminated soils

    International Nuclear Information System (INIS)

    Chagvardieff, P.

    2014-01-01

    Some plants can be selected for their capacity to extract radionuclides from the soil, on the contrary other plants can be chosen for being able to produce food grade products in a contaminated environment. Modern genetic methods can be used to enhance these abilities and turn some plants into an efficient means in the managing of contaminated areas. The DEMETERRES project that gathers different research organisations like CEA, IRSN and INRA and industrial partners like AREVA and VEOLIA aims at developing innovative bio-technologies like phyto-extraction and environment friendly physico-chemical technologies for the remediation of contaminated soils. This project was launched in 2013 on a 5-year scheme and is expected to lead to industrial applications. (A.C.)

  18. Remediation of heavy-metal contaminated sediments by means of bioleaching. Study: project results - economic efficiency - market assessment. Final report; Reinigung schwermetallbelasteter Sedimente durch Bioleaching. Studie: Projektergebnisse - Wirtschaftlichkeit - Marktbewertung. Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Loeser, C; Zehnsdorf, A; Hoffmann, P; Seidel, H; Schmerold, R

    2002-07-01

    Sediments in running and stationary waters continue to pose environmental as well as cost problems. In Saxonian waters alone some 3.7 million m{sup 3} of sediments mostly contaminated with heavy metals from mining or industrial activities are in need of remediation. For lack of practicable remediation methods excavated sediments nowadays are landfilled. However, due to its persisting hazard potential this solution is ecologically unsatisfactory. Exposure of these sediments to oxygen leads to microbial oxidation and acidification processes and hence partial solubilisation of heavy metals. If allowed to proceed uncontrolled this natural bioleaching process poses an environmental hazard. However, if accelerated artificially through activation of autochtonous sulphur oxidising bacteria (e.g. thiobacilli) it can be used to remediate sediments. The goal is to provide a semi-natural sediment decontamination process based on natural biological solubilisation potentials After decontamination, sediments can be returned to the materials cycle as soil substrates. The present process was developed using heavily contaminated sediments from the Weisse Elster region south of Leipzig as example material. For economic reasons it was decided to use a fixed-bed leaching process based on percolation. It proved necessary to use a multistage process. The laboratory and technical-scale experiments were dedicated to developing and implementing measures for faster metal solubilisation. [German] Gewaessersedimente sind ein bisher ungeloestes Umwelt- und Kostenproblem. Allein aus den Gewaessern Sachsens muessen ca. 3,7 Millionen m{sup 3} Sedimente beraeumt werden, diese sind zum grossen Teil mit Schwermetallen aus bergbaulichen und industriellen Aktivitaeten belastet. Gegenwaertig werden die ausgebaggerten Sedimente deponiert, da praktikable Sanierungsverfahren fehlen. Die Deoponierung ist wegen des weiter bestehenden Gefaehrdungspotentials keine oekologisch befriedigende Loesung. Kommen die

  19. Uranium Mill Tailings Remedial Action 1993 Roadmap

    International Nuclear Information System (INIS)

    1993-01-01

    The 1993 Roadmap for the Uranium Mill Tailings Remedial Action (UMTRA) Project office is a tool to assess and resolve issues. The US Department of Energy (DOE) UMTRA Project Office uses the nine-step roadmapping process as a basis for Surface and Groundwater Project planning. This is the second year the Roadmap document has been used to identify key issues and assumptions, develop logic diagrams, and outline milestones. This document is a key element of the DOE planning process. A multi-interest group used the nine-step process to focus on issues, root cause analysis and resolutions. This core group updated and incorporated comments on the basic assumptions, then used these assumptions to identify issues. The list of assumptions was categorized into the following areas: institutional, regulatory compliance, project management, human resource requirements, and other site-specific assumptions. The group identified 10 issues in the analysis phase. All of the issues are ranked according to importance. The number one issue from the 1992 Roadmap, ''Lack of sufficient human resources,'' remained the number one issue in 1993. The issues and their ranking are as follows: Lack of sufficient human resources; increasing regulatory requirements; unresolved groundwater issues; extension of UMTRCA through September 30, 1998; lack of post-UMTRA and post-cell closure policies; unpredictable amounts and timing of Federal funding; lack of regulatory compliance agreements; problem with states providing their share of remedial action costs; different interests and priorities among participants; and technology development/transfer. The issues are outlined and analyzed in detail in Section 8.0, with a schedule for resolution of these issues in Section 9.0

  20. Remediation of the Gunnar uranium mine site, northern Saskatchewan

    International Nuclear Information System (INIS)

    Calvert, H.T.; Brown, J.L.

    2011-01-01

    The Gunnar uranium mine, located in northern Saskatchewan, operated from 1955 to 1963. When the mine was closed, the site was not remediated to the standards that are in place for today's uranium mines. Waste rock and mill tailings were left un-covered and water quality issues were not addressed. As a result, the current state of the site impacts the local environment. The company that operated the Gunnar Mine no longer exists. In 2006, the Government of Saskatchewan and the Government of Canada entered into an agreement to share the costs for remediating the site. An environment assessment of the project to remediate the site is currently underway. This paper provides an update of the issues and the progress being made. (author)

  1. Application of a World Wide Web technology to environmental remediation

    International Nuclear Information System (INIS)

    Johnson, R.; Durham, L. A.

    2000-01-01

    As part of the Formerly Utilized Site Remedial Action Program (FUSRAP), the United States Army Corps of Engineers (USACE), Buffalo District, is responsible for overseeing the remediation of several sites within its jurisdiction. FUSRAP sites are largely privately held facilities that were contaminated by activities associated with the nuclear weapons program in the 1940s, 50s, and 60s. The presence of soils and structures contaminated with low levels of radionuclides is a common problem at these sites. Typically, contaminated materials must be disposed of off-site at considerable expense (up to several hundred dollars per cubic yard of waste material). FUSRAP is on an aggressive schedule, with most sites scheduled for close-out in the next couple of years. Among the multitude of tasks involved in a typical remediation project is the need to inform and coordinate with active stakeholder communities, including local, state, and federal regulators

  2. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  3. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  4. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints

  5. Architecture and environmental restoration: Remediating uranium mill tailings from buildings

    International Nuclear Information System (INIS)

    Teply, J.D.

    1991-01-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) manages the Uranium Mill Tailings Remedial Action (UMTRA) Program in Grand Junction, Colorado. This program is a congressionally mandated clean up of by-product waste that resulted from the extraction of yellow cake from uranium ore. The by-product waste, a fine sand commonly called open-quotes mill tailingclose quotes is contaminated with low-level radioactivity. These mill tailings were available to the community for use as construction material from approximately 1952 to 1966; their use as bedding material for concrete slabs, utilities, backfill materials, concrete sand, and mortar created unique remediation problems that required innovative solutions. This paper describes how design personnel approach the remediation of structures, the evaluation of the buildings, and the factors that must be considered in completing the remediation design. This paper will not address the health risks of the tailings in an inhabited space, the remediation of exterior areas, or the process of determining where the tailings exist in the building

  6. Risk characterization and remedial management of TPH-affected soils

    International Nuclear Information System (INIS)

    Smith, J.; Von Burg, R.; Preslo, L.; Lakin, M.

    1994-01-01

    A risk-based remedial program for petroleum hydrocarbon affected soils has been implemented at a large land parcel in California. The site is the former location of a manufacturing facility that had been in operation since the 1940s. As a result of various activities related to parts manufacturing, several large areas of soil were found to contain various petroleum products. The primary sources of petroleum hydrocarbons included cutting oils, lubricating oils, fuels, and hydraulic oils associated with the site operations. Concentrations of total petroleum hydrocarbons (TPH) as high as 100,000 mg/kg were identified in soil. These high concentrations of TPH were identified at depths up to 60 feet below ground surface (bgs), with the vadose zone extending to depths of more than 150 feet bgs. Within California, traditional cleanup levels for TPH-affected soils typically range from 100 to 1,000 mg/kg. Because of the client's desire to sell the property for rapid development, the remedial alternative of excavation and off-haul was deemed too time consuming and costly. The estimated costs associated with this remediation which potentially involved soil removal to 100--120 feet exceeded $20 million and could take up to one year to complete. To meet the schedule requirements for site remediations as well as significantly reduce the overall project cost, the authors undertook a risk-based approach to assess if remediation of the TPH-affected soils was required

  7. Radon remediation in irish schools

    International Nuclear Information System (INIS)

    Synnott, H.

    2006-01-01

    Full text: Commencing in 1998, the Radiological Protection Institute of Ireland carried out radon measurements in 3826 schools in the Republic of I reland on behalf of the Irish Department of Education and Science (D.E.S.). This represents approximately 97% of all schools in the country. Approximately 25% (984) schools had radon concentrations above the Irish national schools Reference Level for radon of 200 Bq/m 3 and required remedial work. The number of individual rooms with radon concentrations above 200 Bq/m 3 was 3020. Remedial work in schools commenced in early 2000. In general schools with maximum radon concentrations in the range 200 -400 Bq/m 3 in one or more rooms were remediated through the installation of passive systems such as an increase in permanent background ventilation mainly wall vents and trickle vents in windows. Schools with maximum radon concentrations greater than 400 Bq/m 3 were usually remediated through the provision of active systems mainly fan assisted sub -slab de pressurization or where this was not possible fan assisted under floor ventilation. The cost of the remedial programme was funded by central Government. Active systems were installed by specialized remedial contractors working to the specifications of a radon remedial expert appointed by the D.E.S. to design remedial systems for affected schools. Schools requiring increased ventilation were granted aided 190 pounds per affected room and had to organize the work themselves. In most schools radon remediation was successful in reducing existing radon concentrations to below the Reference Level. Average radon concentration reduction factors for sub-slab de pressurization systems and fan assisted fan assisted under floor ventilation ranged from 5 to 40 with greater reduction rates found at higher original radon concentrations. Increasing ventilation in locations with moderately elevated radon concentrations (200 - 400 Bq/m 3 ) while not as effective as active systems produced on

  8. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  9. HANFORD GROUNDWATER REMEDIATION

    Energy Technology Data Exchange (ETDEWEB)

    CHARBONEAU, B; THOMPSON, M; WILDE, R.; FORD, B.; GERBER, M.S.

    2006-02-01

    geographically dispersed community is united in its desire to protect the Columbia River and have a voice in Hanford's future. This paper presents the challenges, and then discusses the progress and efforts underway to reduce the risk posed by contaminated groundwater at Hanford. While Hanford groundwater is not a source of drinking water on or off the Site, there are possible near-shore impacts where it flows into the Columbia River. Therefore, this remediation is critical to the overall efforts to clean up the Site, as well as protect a natural resource.

  10. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    International Nuclear Information System (INIS)

    Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.

    2013-01-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  11. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    Energy Technology Data Exchange (ETDEWEB)

    Beres, Christopher M.; Fort, E. Joseph [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States); Boyle, James D. [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)

    2013-07-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  12. Pre- and post-remediation characterization of acid-generating fluvial tailings material

    Science.gov (United States)

    Smith, Kathleen S.; Walton-Day, Katherine; Hoal, Karin O.; Driscoll, Rhonda L.; Pietersen, K.

    2012-01-01

    The upper Arkansas River south of Leadville, Colorado, USA, contains deposits of fluvial tailings from historical mining operations in the Leadville area. These deposits are potential non-point sources of acid and metal contamination to surface- and groundwater systems. We are investigating a site that recently underwent in situ remediation treatment with lime, fertilizer, and compost. Pre- and post-remediation fluvial tailings material was collected from a variety of depths to examine changes in mineralogy, acid generation, and extractable nutrients. Results indicate sufficient nutrient availability in the post-remediation near-surface material, but pyrite and acid generation persist below the depth of lime and fertilizer addition. Mineralogical characterization performed using semi-quantitative X-ray diffraction and quantitative SEM-based micro-mineralogy (Mineral Liberation Analysis, MLA) reveal formation of gypsum, jarosite, and complex coatings surrounding mineral grains in post-remediation samples.

  13. Usage and Attitudes Towards Natural Remedies and Homeopathy in General Pediatrics

    Directory of Open Access Journals (Sweden)

    André-Michael Beer MD, PhD

    2016-07-01

    Full Text Available In order to better understand the global approach and country differences in physicians’ usage, knowledge, and attitudes towards natural remedies and homeopathy in pediatric practice, an online survey involving 582 general pediatricians and general practitioners treating pediatric diseases was conducted in 6 countries. Overall, 17% of the pediatric prescriptions refer to phytotherapy and 15% refer to homeopathic preparations. Natural remedies and homeopathic preparations are more frequently used in upper respiratory tract infections, infant colic, sleep disturbances, and recurrent infections. In the majority of cases, they are used together with chemical drugs. Both treatment options are typically used if parents are concerned about side effects of conventional drugs or prefer natural remedies for themselves. Physicians express high interest in natural remedies and homeopathy; however, their knowledge is variable. Lack of proven efficacy, knowledge on mechanism of action, and information on indications are main factors that limit their usage.

  14. Usage and Attitudes Towards Natural Remedies and Homeopathy in General Pediatrics

    Science.gov (United States)

    Beer, André-Michael; Burlaka, Ievgeniia; Buskin, Stephen; Kamenov, Borislav; Pettenazzo, Andrea; Popova, Diana; Riveros Huckstadt, María Pilar; Sakalinskas, Virgilijus; Oberbaum, Menachem

    2016-01-01

    In order to better understand the global approach and country differences in physicians’ usage, knowledge, and attitudes towards natural remedies and homeopathy in pediatric practice, an online survey involving 582 general pediatricians and general practitioners treating pediatric diseases was conducted in 6 countries. Overall, 17% of the pediatric prescriptions refer to phytotherapy and 15% refer to homeopathic preparations. Natural remedies and homeopathic preparations are more frequently used in upper respiratory tract infections, infant colic, sleep disturbances, and recurrent infections. In the majority of cases, they are used together with chemical drugs. Both treatment options are typically used if parents are concerned about side effects of conventional drugs or prefer natural remedies for themselves. Physicians express high interest in natural remedies and homeopathy; however, their knowledge is variable. Lack of proven efficacy, knowledge on mechanism of action, and information on indications are main factors that limit their usage. PMID:27493983

  15. Composites for Exploration Upper Stage

    Science.gov (United States)

    Fikes, J. C.; Jackson, J. R.; Richardson, S. W.; Thomas, A. D.; Mann, T. O.; Miller, S. G.

    2016-01-01

    The Composites for Exploration Upper Stage (CEUS) was a 3-year, level III project within the Technology Demonstration Missions program of the NASA Space Technology Mission Directorate. Studies have shown that composites provide important programmatic enhancements, including reduced weight to increase capability and accelerated expansion of exploration and science mission objectives. The CEUS project was focused on technologies that best advanced innovation, infusion, and broad applications for the inclusion of composites on future large human-rated launch vehicles and spacecraft. The benefits included near- and far-term opportunities for infusion (NASA, industry/commercial, Department of Defense), demonstrated critical technologies and technically implementable evolvable innovations, and sustained Agency experience. The initial scope of the project was to advance technologies for large composite structures applicable to the Space Launch System (SLS) Exploration Upper Stage (EUS) by focusing on the affordability and technical performance of the EUS forward and aft skirts. The project was tasked to develop and demonstrate critical composite technologies with a focus on full-scale materials, design, manufacturing, and test using NASA in-house capabilities. This would have demonstrated a major advancement in confidence and matured the large-scale composite technology to a Technology Readiness Level 6. This project would, therefore, have bridged the gap for providing composite application to SLS upgrades, enabling future exploration missions.

  16. Y-12 Plant Remedial Action technology logic diagram. Volume I: Technology evaluation

    International Nuclear Information System (INIS)

    1994-09-01

    The Y-12 Plant Remedial Action Program addresses remediation of the contaminated groundwater, surface water and soil in the following areas located on the Oak Ridge Reservation: Chestnut Ridge, Bear Creek Valley, the Upper and Lower East Fork Popular Creek Watersheds, CAPCA 1, which includes several areas in which remediation has been completed, and CAPCA 2, which includes dense nonaqueous phase liquid wells and a storage facility. There are many facilities within these areas that are contaminated by uranium, mercury, organics, and other materials. This Technology Logic Diagram identifies possible remediation technologies that can be applied to the soil, water, and contaminants for characterization, treatment, and waste management technology options are supplemented by identification of possible robotics or automation technologies. These would facilitate the cleanup effort by improving safety, of remediation, improving the final remediation product, or decreasing the remediation cost. The Technology Logic Diagram was prepared by a diverse group of more than 35 scientists and engineers from across the Oak Ridge Reservation. Most are specialists in the areas of their contributions. 22 refs., 25 tabs

  17. A remedial alternative prioritization method

    International Nuclear Information System (INIS)

    Richter, S.A.; Travis, C.C.

    1987-01-01

    This study develops and tests a technique for evaluating and prioritizing alternative remedial actions for hazardous waste sites. The method is based on criteria involving risk, benefit and cost, and identifies the most cost-effective solution to a given remedial problem. Four sites on the Department of Energy's Oak Ridge National Laboratory (ORNL) property in Oak Ridge, Tennessee, were used in a case study to develop and test the method. Results of the case study indicate that even if the cap providing in situ containment must be replaced every 10 years, it is a superior alternative to total excavation of the waste sites

  18. Avian Conservation Areas as a Proxy for Contaminated Soil Remediation.

    Science.gov (United States)

    Lin, Wei-Chih; Lin, Yu-Pin; Anthony, Johnathen; Ding, Tsun-Su

    2015-07-17

    Remediation prioritization frequently falls short of systematically evaluating the underlying ecological value of different sites. This study presents a novel approach to delineating sites that are both contaminated by any of eight heavy metals and have high habitat value to high-priority species. The conservation priority of each planning site herein was based on the projected distributions of eight protected bird species, simulated using 900 outputs of species distribution models (SDMs) and the subsequent application of a systematic conservation tool. The distributions of heavy metal concentrations were generated using a geostatistical joint-simulation approach. The uncertainties in the heavy metal distributions were quantified in terms of variability among 1000 realization sets. Finally, a novel remediation decision-making approach was presented for delineating contaminated sites in need of remediation based on the spatial uncertainties of multiple realizations and the priorities of conservation areas. The results thus obtained demonstrate that up to 42% of areas of high conservation priority are also contaminated by one or more of the heavy metal contaminants of interest. Moreover, as the proportion of the land for proposed remediated increased, the projected area of the pollution-free habitat also increased. Overall uncertainty, in terms of the false positive contamination rate, also increased. These results indicate that the proposed decision-making approach successfully accounted for the intrinsic trade-offs among a high number of pollution-free habitats, low false positive rates and robustness of expected decision outcomes.

  19. Avian Conservation Areas as a Proxy for Contaminated Soil Remediation

    Directory of Open Access Journals (Sweden)

    Wei-Chih Lin

    2015-07-01

    Full Text Available Remediation prioritization frequently falls short of systematically evaluating the underlying ecological value of different sites. This study presents a novel approach to delineating sites that are both contaminated by any of eight heavy metals and have high habitat value to high-priority species. The conservation priority of each planning site herein was based on the projected distributions of eight protected bird species, simulated using 900 outputs of species distribution models (SDMs and the subsequent application of a systematic conservation tool. The distributions of heavy metal concentrations were generated using a geostatistical joint-simulation approach. The uncertainties in the heavy metal distributions were quantified in terms of variability among 1000 realization sets. Finally, a novel remediation decision-making approach was presented for delineating contaminated sites in need of remediation based on the spatial uncertainties of multiple realizations and the priorities of conservation areas. The results thus obtained demonstrate that up to 42% of areas of high conservation priority are also contaminated by one or more of the heavy metal contaminants of interest. Moreover, as the proportion of the land for proposed remediated increased, the projected area of the pollution-free habitat also increased. Overall uncertainty, in terms of the false positive contamination rate, also increased. These results indicate that the proposed decision-making approach successfully accounted for the intrinsic trade-offs among a high number of pollution-free habitats, low false positive rates and robustness of expected decision outcomes.

  20. Oak Ridge National Laboratory remedial investigation/feasibility study

    International Nuclear Information System (INIS)

    Glenn, R.D.; Hoffman, J.M.; Hyde, L.D.

    1988-01-01

    The Oak Ridge National Laboratory (ORNL) Remedial Investigation/ Feasibility Study (RI/FS) began in June 1987 to evaluate 13 contaminated waste area groupings (WAGs) to determine the feasibility and benefits of potential remedial action. The RI/FS and any future remedial action at ORNL will be of national significance and will likely lead to developments that will become models for environmental investigations and cleanups. Bechtel National, Inc. and a team of subcontractors will be working with Martin Marietta Energy systems to conduct intensive field investigations to obtain data required to evaluate the WAGs. The RI/F project continued in FY 1988 with project planning and preparation for field activities. Remedial Investigation (RI) Plans were prepared for 10 of the 13 WAGs. These plans were developed with sufficient information to ensure compliance with regulatory requirements, with intensive attention given to environmental, safety, and health protection; waste management; data management; and quality assurance. This paper reports on the progress made during FY 1988 and discusses activities planned for FY 1989

  1. Bioelectrical Perchlorate Remediation

    Science.gov (United States)

    Thrash, C.; Achenbach, L. A.; Coates, J. D.

    2007-12-01

    low-level perchlorate (100 μg.L-1) influent as well as mixed-waste influents more typically found in the environment containing both nitrate and perchlorate. Through extended periods of operation (>70 days), no loss in treatment efficiency was noted and no measurable growth in biomass was observed. Gas phase analysis indicated that low levels of H2 produced at the cathode surface through electrolysis can provide enough reducing equivalents to mediate this metabolism. The results of these studies demonstrate that perchlorate remediation can be facilitated through the use of a cathode as the primary electron donor, and that continuous treatment in such a system approaches current industry standards. This has important implications for the continuous treatment of this critical contaminant in industrial waste streams and drinking water. Such a process has the advantage of long-term, low-maintenance operation with ease of online monitoring and control while limiting the injection of additional chemicals into the water treatment process and outgrowth of the microbial populations. This would negate the need for the continual removal and disposal of biomass produced during treatment and also the downstream issues associated with corrosion and biofouling of distribution systems and the production of toxic disinfection byproducts.

  2. Remediation Technologies Eliminate Contaminants

    Science.gov (United States)

    2012-01-01

    groundwater tainted by chlorinated solvents once used to clean rocket engine components. The award-winning innovation (Spinoff 2010) is now NASA s most licensed technology to date. PCBs in paint presented a new challenge. Removing the launch stand for recycling proved a difficult operation; the toxic paint had to be fully stripped from the steel structure, a lengthy and costly process that required the stripped paint to be treated before disposal. Noting the lack of efficient, environmentally friendly options for dealing with PCBs, Quinn and her colleagues developed the Activated Metal Treatment System (AMTS). AMTS is a paste consisting of a solvent solution containing microscale particles of activated zero-valent metal. When applied to a painted surface, the paste extracts and degrades the PCBs into benign byproducts while leaving the paint on the structure. This provides a superior alternative to other methods for PCB remediation, such as stripping the paint or incinerating the structure, which prevents reuse and can release volatized PCBs into the air. Since its development, AMTS has proven to be a valuable solution for removing PCBs from paint, caulking, and various insulation and filler materials in older buildings, naval ships, and former munitions facilities where the presence of PCBs interferes with methods for removing trace explosive materials. Miles of potentially toxic caulking join sections of runways at airports. Any of these materials installed before 1979 potentially contain PCBs, Quinn says. "This is not just a NASA problem," she says. "It s a global problem."

  3. Stream remediation following a gasoline spill

    International Nuclear Information System (INIS)

    Owens, E.H.; Reiter, G.A.; Challenger, G.

    2000-01-01

    On June 10, 1999, a pipe ruptured on the Olympic Pipe Line causing the release, explosion and fire of up to one million litres of gasoline in Bellingham, Washington. It affected approximately 5 km of the Whatcom Creek ecosystem. Following the incident, several concurrent activities in the source area and downstream occurred. This paper discussed the remediation of the affected stream bed sections. During the period July 6 - August 16, an interagency project was implemented. It involved mechanical, manual, and hydraulic in-situ treatment techniques to remove the gasoline from the stream bed and the banks. In addition, a series of controlled, hydraulic flushes were conducted. The sluice or control gates at the head of the Whatcom Creek were opened each night, and bigger flushes took place before and after the treatments. Simultaneously, water and sediment were sampled and analysed. The data obtained provided information on the state of the initial stream water and stream sediment and on the effects that the remediation had had. The residual gasoline was successfully removed from the sediments and river banks in six weeks. No downstream movement of the released gasoline towards Bellingham was detected. 3 refs., 2 tabs., 11 figs

  4. Upper Gastrointestinal (GI) Series

    Science.gov (United States)

    ... standard barium upper GI series, which uses only barium a double-contrast upper GI series, which uses both air and ... evenly coat your upper GI tract with the barium. If you are having a double-contrast study, you will swallow gas-forming crystals that ...

  5. Information Literacy in the Upper Secondary School

    DEFF Research Database (Denmark)

    Holm, Claus; Schreiber, Trine; Tønnesen, Pia Hvid

    The discussion paper is a publication from the project Information Literacy in the Upper Secondary School. The project is a collaboration between the National Library of Education at the Danish School of Education, Aarhus University, and the Royal School of Library and Information Science....... The project is funded by Denmark's Electronic Research Library (DEFF). The discussion paper is published in connection with the conference Information Literacy in the Upper Secondary School on 22 April 2010. See video streaming from the conference etc. at www.dpu.dk/info....

  6. Setting a benchmark in remediation

    International Nuclear Information System (INIS)

    Ong, Jacqueline

    2014-01-01

    Full text: Thiess Services has achieved a first in the treatment of contaminated soil, in the process assisting Orica in successfully removing a toxic legacy. In 1980, when Orica Australia's predecessor ICI Australia constructed its car park waste encapsulation (CPWE) to seal off contaminated soil at Botany Industrial Park, 12km south of the Sydney CBD, treatment methods were not available. Fast-forward more than 30 years and Thiess Services has successfully undertaken treatment of the soil, earning it the 2013 CARE award. The contaminated soil contained hexachlorobutadiene (HCBD), low levels of hexachlorobenzene and hexachloroethane, all by-products of historical manufacturing of chlorinated solvents, including dry cleaning fluid, in the 1960s and 1970s. ICI Australia decided initially to store the contaminated material in drums and place it on a bed of boiler ash. However, drum corrosion led to contamination of the ash bed and underlying soil, so the company decided to encapsulate the material within a synthetic Hypalon liner, covering it with clean soil and capping it with bitumen in a 45,000 cubic metre cell. In 2005, Orica commissioned Thiess to assess a range of remediation methods and technologies to treat the material. Three options were recommended — directly heated thermal desorption, in situ thermal desorption and indirectly heated thermal desorption. “Together with Orica, we decided that directly heated thermal desorption was the appropriate technology to use,” Thiess project manager Joshua Van Der Heiden said. “Essentially, the soil is introduced into a rotary kiln and a flame directly heats up the soil above the contaminants' boiling point (up to a maximum of 450C) so that the contaminants are volatilised and the soil comes out clean. The gas separated from the soil is then heated to around 1000C in a thermal oxidiser, converting it into carbon dioxide and water. To prevent contaminants from reforming, the gas stream is rapidly cooled by a

  7. Department of Energy hazardous waste remedial actions program: Quality assurance program

    International Nuclear Information System (INIS)

    Horne, T.E.

    1988-01-01

    This paper describes the Quality Assurance Program developed for the Hazardous Waste Remedial Actions Program Support Contractor Office (HAZWRAP SCO). Key topics discussed include an overview of the HAZWRAP SCO mission and organization, the basic quality assurance program requirements and the requirements for the control of quality for the Department of Energy and Work for Others hazardous waste management programs, and the role of ensuring quality through the project team concept for the management of remedial response actions. The paper focuses on planning for quality assurance for this remedial waste management process from preliminary assessments of remedial sites to feasibility studies. Some observations concerning the control of quality during the implementation of remedial actions are presented. (2 refs.)

  8. Remediation of radioactively contaminated facilities and the site of Russian Research Center Kurchatov Institute

    International Nuclear Information System (INIS)

    Velikhov, E.P.; Ponomarev-Stepnoj, N.N.; Volkov, V.G.

    2007-01-01

    One discusses the efforts to rehabilitate the radiation hazard installations and to remediate the contaminated territory of the Kurchatov Institute RSC undertaken in 2006-2007 in terms of the Remediation Project. The old radwaste storage facilities constructed at the site when the Institute was involved in activities to elaborate both war and civil nuclear technologies were the basic objects of the rehabilitation efforts. Paper describes the structure of the storage facilities covering the volume and the characteristics of the stored radwaste. Paper discusses the storage facility site layout parameters taken into consideration in the course of the remediation efforts. Paper describes the procedures, the sequence of the remediation efforts and the peculiar features of the planning and engineering approaches. Paper dwells upon the results of the rehabilitation and the remediation efforts [ru

  9. The UMTRA PEIS: A strategy for groundwater remediation

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Weston, R.F.; Metzler, D.

    1993-01-01

    A programmatic environmental impact statement (PEIS) was initiated in 1992 for the uranium mill tailings remedial action (UMTRA) program. The PEIS kicked off the groundwater restoration phase of UMTRA, a project involving remediation of 24 sites in ten states and tribal lands contaminated with tailings from uranium mining and milling operations. The U.S. Department of Energy (DOE) agreed, in early 1992, that a PEIS was an appropriate strategy to comply with the National Environmental Policy Act (NEPA) for this second, groundwater phase of the project. This decision recognized that although a parallel effort was being undertaken in preparing a PEIS for DOE's Environmental Restoration/Waste Management (ER/WM) program, characteristics and the maturity of the UMTRA project made it more appropriate to prepare a separate PEIS. The ER/WM PEIS is intended to examine environmental restoration and waste management issues from a very broad perspective. For UMTRA, with surface remediation completed or well under way at 18 of the 24 sites, a more focused programmatic approach for groundwater restoration is more effective than including the UMTRA project within the ER/WM environmental impact statements. A separate document allows a more focused and detailed analysis necessary to efficiently tier site-specific environmental assessments for groundwater restoration at each of the 24 UMTRA former processing sites

  10. Abstracts of Remediation Case Studies, Volume 9

    Science.gov (United States)

    This report, published by the Federal Remediation Technologies Roundtable (FRTR), is a collection of recently published abstracts summarizing 13 cost and performance case studies on the use of remediation technologies at contaminated sites.

  11. Steam Injection For Soil And Aquifer Remediation

    Science.gov (United States)

    The purpose of this Issue Paper is to provide to those involved in assessing remediation technologies for specific sites basic technical information on the use of steam injection for the remediation of soils and aquifers that are contaminated by...

  12. Key Principles of Superfund Remedy Selection

    Science.gov (United States)

    Guidance on the primary considerations of remedy selection which are universally applicable at Superfund sites. Key guidance here include: Rules of Thumb for Superfund Remedy Selection and Role of the Baseline Risk Assessment.

  13. Electrokinetic remediation of copper mine tailings

    DEFF Research Database (Denmark)

    Hansen, Henrik K.; Rojo, Adrián; Ottosen, Lisbeth M.

    2007-01-01

    Important process parameters to optimize in electrokinetic soil remediation are those influencing remediation time and power consumption since these directly affect the cost of a remediation action. This work shows how the electrokinetic remediation (EKR) process could be improved by implementing...... bipolar electrodes in the porous material. The bipolar electrodes in EKR meant two improvements: (1) a shorter migration pathway for the contaminant, and (2) an increased electrical conductivity in the remediation system. All together the remediation proceeded faster with lower electrical resistance than...... in similar experiments but without the bipolar electrodes. The new electrokinetic remediation design was tested on copper mine tailings with different applied electric fields, remediation times and pre-treatment. The results showed that the copper removal was increased from 8% (applying 20V for 8 days...

  14. Electrodialytic Remediation of Copper Mine Tailings

    DEFF Research Database (Denmark)

    Hansen, H.K.; Rojo, A.; Ottosen, L.M.

    2012-01-01

    This work compares and evaluates sixteen electrodialytic laboratory remediation experiments on copper mine tailings. Different parameters were analysed, such as remediation time, addition of desorbing agents, and the use of pulsed electrical fields.......This work compares and evaluates sixteen electrodialytic laboratory remediation experiments on copper mine tailings. Different parameters were analysed, such as remediation time, addition of desorbing agents, and the use of pulsed electrical fields....

  15. Clinical evaluation of image quality and radiation dose reduction in upper abdominal computed tomography using model-based iterative reconstruction; comparison with filtered back projection and adaptive statistical iterative reconstruction

    International Nuclear Information System (INIS)

    Nakamoto, Atsushi; Kim, Tonsok; Hori, Masatoshi; Onishi, Hiromitsu; Tsuboyama, Takahiro; Sakane, Makoto; Tatsumi, Mitsuaki; Tomiyama, Noriyuki

    2015-01-01

    Highlights: • MBIR significantly improves objective image quality. • MBIR reduces the radiation dose by 87.5% without increasing objective image noise. • A half dose will be needed to maintain the subjective image quality. - Abstract: Purpose: To evaluate the image quality of upper abdominal CT images reconstructed with model-based iterative reconstruction (MBIR) in comparison with filtered back projection (FBP) and adaptive statistical iterative reconstruction (ASIR) on scans acquired with various radiation exposure dose protocols. Materials and methods: This prospective study was approved by our institutional review board, and informed consent was obtained from all 90 patients who underwent both control-dose (CD) and reduced-dose (RD) CT of the upper abdomen (unenhanced: n = 45, contrast-enhanced: n = 45). The RD scan protocol was randomly selected from three protocols; Protocol A: 12.5% dose, Protocol B: 25% dose, Protocol C: 50% dose. Objective image noise, signal-to-noise (SNR) ratio for the liver parenchyma, visual image score and lesion conspicuity were compared among CD images of FBP and RD images of FBP, ASIR and MBIR. Results: RD images of MBIR yielded significantly lower objective image noise and higher SNR compared with RD images of FBP and ASIR for all protocols (P < .01) and CD images of FBP for Protocol C (P < .05). Although the subjective image quality of RD images of MBIR was almost acceptable for Protocol C, it was inferior to that of CD images of FBP for Protocols A and B (P < .0083). The conspicuity of the small lesions in RD images of MBIR tended to be superior to that in RD images of FBP and ASIR and inferior to that in CD images for Protocols A and B, although the differences were not significant (P > .0083). Conclusion: Although 12.5%-dose MBIR images (mean size-specific dose estimates [SSDE] of 1.13 mGy) yielded objective image noise and SNR comparable to CD-FBP images, at least a 50% dose (mean SSDE of 4.63 mGy) would be needed to

  16. Clinical evaluation of image quality and radiation dose reduction in upper abdominal computed tomography using model-based iterative reconstruction; comparison with filtered back projection and adaptive statistical iterative reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Nakamoto, Atsushi, E-mail: a-nakamoto@radiol.med.osaka-u.ac.jp; Kim, Tonsok, E-mail: kim@radiol.med.osaka-u.ac.jp; Hori, Masatoshi, E-mail: mhori@radiol.med.osaka-u.ac.jp; Onishi, Hiromitsu, E-mail: h-onishi@radiol.med.osaka-u.ac.jp; Tsuboyama, Takahiro, E-mail: t-tsuboyama@radiol.med.osaka-u.ac.jp; Sakane, Makoto, E-mail: m-sakane@radiol.med.osaka-u.ac.jp; Tatsumi, Mitsuaki, E-mail: m-tatsumi@radiol.med.osaka-u.ac.jp; Tomiyama, Noriyuki, E-mail: tomiyama@radiol.med.osaka-u.ac.jp

    2015-09-15

    Highlights: • MBIR significantly improves objective image quality. • MBIR reduces the radiation dose by 87.5% without increasing objective image noise. • A half dose will be needed to maintain the subjective image quality. - Abstract: Purpose: To evaluate the image quality of upper abdominal CT images reconstructed with model-based iterative reconstruction (MBIR) in comparison with filtered back projection (FBP) and adaptive statistical iterative reconstruction (ASIR) on scans acquired with various radiation exposure dose protocols. Materials and methods: This prospective study was approved by our institutional review board, and informed consent was obtained from all 90 patients who underwent both control-dose (CD) and reduced-dose (RD) CT of the upper abdomen (unenhanced: n = 45, contrast-enhanced: n = 45). The RD scan protocol was randomly selected from three protocols; Protocol A: 12.5% dose, Protocol B: 25% dose, Protocol C: 50% dose. Objective image noise, signal-to-noise (SNR) ratio for the liver parenchyma, visual image score and lesion conspicuity were compared among CD images of FBP and RD images of FBP, ASIR and MBIR. Results: RD images of MBIR yielded significantly lower objective image noise and higher SNR compared with RD images of FBP and ASIR for all protocols (P < .01) and CD images of FBP for Protocol C (P < .05). Although the subjective image quality of RD images of MBIR was almost acceptable for Protocol C, it was inferior to that of CD images of FBP for Protocols A and B (P < .0083). The conspicuity of the small lesions in RD images of MBIR tended to be superior to that in RD images of FBP and ASIR and inferior to that in CD images for Protocols A and B, although the differences were not significant (P > .0083). Conclusion: Although 12.5%-dose MBIR images (mean size-specific dose estimates [SSDE] of 1.13 mGy) yielded objective image noise and SNR comparable to CD-FBP images, at least a 50% dose (mean SSDE of 4.63 mGy) would be needed to

  17. Green Chemistry and Environmental Remediation

    Science.gov (United States)

    Abstract: Nutrient remediation and recovery is a growing concern for two key reasons: (i) the prevention of harmful algal bloom proliferation, and (ii) the recycling of nutrients (e.g., phosphates) as they are non-renewable resources which are quickly being depleted. A wide range...

  18. Academic Intervention: Acceleration and Remediation

    Science.gov (United States)

    Franklin, Barbara Gail

    2016-01-01

    Eighth grade math students must pass a standards based test to be promoted to the next grade. Students who were at risk of failing the state's annual test faced impending retention. The purpose of this quasi-experimental study was to see if an intensive nine-week (55 min per day) remedial Math Connection (MC) class for 67 suburban, eighth grade…

  19. Remediation of the protein data bank archive

    Science.gov (United States)

    Henrick, Kim; Feng, Zukang; Bluhm, Wolfgang F.; Dimitropoulos, Dimitris; Doreleijers, Jurgen F.; Dutta, Shuchismita; Flippen-Anderson, Judith L.; Ionides, John; Kamada, Chisa; Krissinel, Eugene; Lawson, Catherine L.; Markley, John L.; Nakamura, Haruki; Newman, Richard; Shimizu, Yukiko; Swaminathan, Jawahar; Velankar, Sameer; Ory, Jeramia; Ulrich, Eldon L.; Vranken, Wim; Westbrook, John; Yamashita, Reiko; Yang, Huanwang; Young, Jasmine; Yousufuddin, Muhammed; Berman, Helen M.

    2008-01-01

    The Worldwide Protein Data Bank (wwPDB; wwpdb.org) is the international collaboration that manages the deposition, processing and distribution of the PDB archive. The online PDB archive at ftp://ftp.wwpdb.org is the repository for the coordinates and related information for more than 47 000 structures, including proteins, nucleic acids and large macromolecular complexes that have been determined using X-ray crystallography, NMR and electron microscopy techniques. The members of the wwPDB–RCSB PDB (USA), MSD-EBI (Europe), PDBj (Japan) and BMRB (USA)–have remediated this archive to address inconsistencies that have been introduced over the years. The scope and methods used in this project are presented. PMID:18073189

  20. Sustainable Remediation for Enhanced NAPL Recovery from Groundwater

    Science.gov (United States)

    Javaher, M.

    2012-12-01

    Sustainable remediation relates to the achievement of balance between environmental, social, and economic elements throughout the remedial lifecycle. A significant contributor to this balance is the use of green and sustainable technologies which minimize environmental impacts, while maximizing social and economic benefits of remedial implementation. To this end, a patented mobile vapor energy generation (VEG) technology has been developed targeting variable applications, including onsite soil remediation for unrestricted reuse and enhanced non-aqueous phase liquid (NAPL) recover at the water table. At the core of the mobile VEG technology is a compact, high efficiency vapor generator, which utilizes recycled water and propane within an entirely enclosed system to generate steam as high as 1100°F. Operating within a fully enclosed system and capturing all heat that is generated within this portable system, the VEG technology eliminates all emissions to the atmosphere and yields an undetected carbon footprint with resulting carbon dioxide concentrations that are below ambient levels. Introduction of the steam to the subsurface via existing wells results in a desired change in the NAPL viscosity and the interfacial tension at the soil, water, NAPL interface; in turn, this results in mobilization and capture of the otherwise trapped, weathered NAPL. Approved by the California Air Resources Control Board (and underlying Air Quality Management Districts) and applied in California's San Joaquin Valley, in-well heating of NAPLs trapped at the water table using the VEG technology has proven as effective as electrical resistivity heating (ERH) in changing the viscosity of and mobilizing NAPLs in groundwater in support of recovery, but has achieved these results while minimizing the remedial carbon footprint by 90%, reducing energy use by 99%, and reducing remedial costs by more than 95%. NAPL recovery using VEG has also allowed for completion of source removal historically