WorldWideScience

Sample records for reliable operation performance

  1. Operational human performance reliability assessment (OHPRA)

    International Nuclear Information System (INIS)

    Haas, P.M.; Swanson, P.J.; Connelly, E.M.

    1993-01-01

    Operational Human Performance Reliability Assessment (OHPRA) is an approach for assessing human performance that is being developed in response to demands from modern process industries for practical and effective tools to assess and improve human performance, and therefore overall system performance and safety. The single most distinguishing feature of the approach is that is defines human performance in open-quotes operationalclose quotes terms. OHPRA is focused not on generation of human error probabilities, but on practical analysis of human performance to aid management in (1) identifying open-quotes fixableclose quotes problems and (2) providing input on the importance and nature of potential improvements. Development of the model in progress uses a unique approach for eliciting expert strategies for assessing performance. A PC-based model incorporating this expertise is planned. A preliminary version of the approach has already been used successfully to identify practical human performance problems in reactor and chemical process plant operations

  2. Cryogenics system: strategy to achieve nominal performance and reliable operation

    International Nuclear Information System (INIS)

    Bremer, J.; Brodzinski, K.; Casas, J.; Claudet, S.; Delikaris, D.; Delruelle, N.; Ferlin, G.; Fluder, C.; Perin, A.; Perinic, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.

    2012-01-01

    During the LHC operation in 2010 and 2011, the cryogenic system has achieved an availability level fulfilling the overall requirement. To reach this level, the cryogenic system has profited like many other beam-dependent systems from the reduced beam parameters. Therefore, impacts of some failures occurred during the LHC operation were mitigated by using the over-capacity margin, the existing built-in redundancy in between adjacent sector cryogenic plants and the 'cannibalization' of spares on two idle cryogenic plants. These two first years of operation were also crucial to identify the weaknesses of the present cryogenic maintenance plan and new issues like SEUs. After the LS1, nominal beam parameters are expected and the mitigated measures will be less effective or not applicable at all. Consequently, a consolidation plan to improve the MTBF and the MTTR of the LHC cryogenic system is under definition. Concerning shutdown periods, the present cryogenic sectorization imposes some restrictions in the type of interventions (e.g. cryo-magnet removal) which can be done without affecting the operating conditions of the adjacent sector. This creates additional constrains and possible extra down-time in the schedule of the shutdowns including the hardware commissioning. This presentation focuses on the consolidation plan foreseen during the LS1 to improve the performance of the LHC cryogenic system in terms of availability and sectorization. (authors)

  3. Cryogenics system: strategy to achieve nominal performance and reliable operation

    CERN Document Server

    Bremer, J; Casas, J; Claudet, S; Delikaris, D; Delruelle, N; Ferlin, G; Fluder, C; Perin, A; Perinic, G; Pezzetti, M; Pirotte, O; Tavian, L; Wagner, U

    2012-01-01

    During the LHC operation in 2010 and 2011, the cryogenic system has achieved an availability level fulfilling the overall requirement. To reach this level, the cryogenic system has profited like many other beam-dependent systems from the reduced beam parameters. Therefore, impacts of some failures occurred during the LHC operation were mitigated by using the overcapacity margin, the existing built-in redundancy in between adjacent sector cryogenic plants and the "cannibalization" of spares on two idle cryogenic plants. These two first years of operation were also crucial to identify the weaknesses of the present cryogenic maintenance plan and new issues like SEUs. After the LS1, nominal beam parameters are expected and the mitigated measures will be less effective or not applicable at all. Consequently, a consolidation plan to improve the MTBF and the MTTR of the LHC cryogenic system is under definition. Concerning shutdown periods, the present cryogenic sectorization imposes some restrictions in the type of ...

  4. APPLICATION OF TRAVEL TIME RELIABILITY FOR PERFORMANCE ORIENTED OPERATIONAL PLANNING OF EXPRESSWAYS

    Science.gov (United States)

    Mehran, Babak; Nakamura, Hideki

    Evaluation of impacts of congestion improvement scheme s on travel time reliability is very significant for road authorities since travel time reliability repr esents operational performance of expressway segments. In this paper, a methodology is presented to estimate travel tim e reliability prior to implementation of congestion relief schemes based on travel time variation modeling as a function of demand, capacity, weather conditions and road accident s. For subject expressway segmen ts, traffic conditions are modeled over a whole year considering demand and capacity as random variables. Patterns of demand and capacity are generated for each five minute interval by appl ying Monte-Carlo simulation technique, and accidents are randomly generated based on a model that links acci dent rate to traffic conditions. A whole year analysis is performed by comparing de mand and available capacity for each scenario and queue length is estimated through shockwave analysis for each time in terval. Travel times are estimated from refined speed-flow relationships developed for intercity expressways and buffer time index is estimated consequently as a measure of travel time reliability. For validation, estimated reliability indices are compared with measured values from empirical data, and it is shown that the proposed method is suitable for operational evaluation and planning purposes.

  5. Operational safety reliability research

    International Nuclear Information System (INIS)

    Hall, R.E.; Boccio, J.L.

    1986-01-01

    Operating reactor events such as the TMI accident and the Salem automatic-trip failures raised the concern that during a plant's operating lifetime the reliability of systems could degrade from the design level that was considered in the licensing process. To address this concern, NRC is sponsoring the Operational Safety Reliability Research project. The objectives of this project are to identify the essential tasks of a reliability program and to evaluate the effectiveness and attributes of such a reliability program applicable to maintaining an acceptable level of safety during the operating lifetime at the plant

  6. Performance of nuclear power plants and analysis of some factors affecting their operational reliability and economy

    International Nuclear Information System (INIS)

    Kozak, M.; Havel, S.

    1989-09-01

    In Czechoslovakia, there are eight WWER 440 type reactors in operation at present. Since their introduction into operation, nuclear power plants in Czechoslovakia have exhibited high reliability. In the paper, total parameters of reliability with an analysis of causes affecting negatively their annual utilization are presented. Existence of a computerized information system for acquisition, recording and evaluation of reliability-significant data from operation and its feedback to designers and manufacturers of nuclear power plant equipment and components is a basic requirement of a systematic assurance of the needed level of nuclear power plant reliability. The information system is used simultaneously also for realistic evaluation of aging of equipment and systems. Analysis of the state of equipment is important mainly in the final stage of the NPP during consideration of further extension of its service life. Environmental effects of the Czechoslovak NPPs are very low (favourable). It follows from comparison of annual dose equivalents of the Czechoslovak NPPs operational personnel with the foreign NPPs that the values recorded in Czechoslovakia belong to the lowest ones. In conclusion, some ways of assurance of operational safety and reliability of the Czechoslovak nuclear power plants including the role of the State regulatory body are briefly discussed. (author). 3 tabs

  7. The Impact of Automation Reliability and Operator Fatigue on Performance and Reliance

    Science.gov (United States)

    2016-09-23

    Cummings et al., 2007). Automation designed to assist operators in overload situations may promote operator disengagement during periods of low...Calhoun et al., 2011). This testbed offers several tasks designed to emulate the cognitive demands that an operator managing multiple UAVs is likely...reliable (Cronbach’s α = 0.94) measure of affective and cognitive components of trust in automation. Items gauge confidence in an automation and

  8. Reliability analysis and operator modelling

    International Nuclear Information System (INIS)

    Hollnagel, Erik

    1996-01-01

    The paper considers the state of operator modelling in reliability analysis. Operator models are needed in reliability analysis because operators are needed in process control systems. HRA methods must therefore be able to account both for human performance variability and for the dynamics of the interaction. A selected set of first generation HRA approaches is briefly described in terms of the operator model they use, their classification principle, and the actual method they propose. In addition, two examples of second generation methods are also considered. It is concluded that first generation HRA methods generally have very simplistic operator models, either referring to the time-reliability relationship or to elementary information processing concepts. It is argued that second generation HRA methods must recognise that cognition is embedded in a context, and be able to account for that in the way human reliability is analysed and assessed

  9. Nuclear performance and reliability

    International Nuclear Information System (INIS)

    Rothwell, G.

    1993-01-01

    If fewer forced outages are a sign of improved safety, nuclear power plants have become safer and more productive. There has been a significant improvement in nuclear power plant performance, due largely to a decline in the forced outage rate and a dramatic drop in the average number of forced outages per fuel cycle. If fewer forced outages are a sign of improved safety, nuclear power plants have become safer and more productive over time. To encourage further increases in performance, regulatory incentive schemes should reward reactor operators for improved reliability and safety, as well as for improved performance

  10. The performance shaping factors influence analysis on the human reliability for NPP operation

    International Nuclear Information System (INIS)

    Farcasiu, M.; Nitoi, M.; Apostol, M.; Florescu, G.

    2008-01-01

    The Human Reliability Analysis (HRA) is an important step in Probabilistic Safety Assessment (PSA) studies and offers an advisability for concrete improvement of the man - machine - organization interfaces, reliability and safety. The goals of this analysis are to obtain sufficient details in order to understand and document all-important factors that affect human performance. The purpose of this paper is to estimate the human errors probabilities in view of the negative or positive effect of the human performance shaping factors (PSFs) for the mitigation of the initiating events which could occur in Nuclear Power Plant (NPP). Using THERP and SPAR-H methods, an analysis model of PSFs influence on the human reliability is performed. This model is applied to more important activities, that are necessary to mitigate 'one steam generator tube failure' event at Cernavoda NPP. The results are joint human error probabilities (JHEP) values estimated for the following situations: without regarding to PSFs influence; with PSFs in specific conditions; with PSFs which could have only positive influence and with PSFs which could have only negative influence. In addition, PSFs with negative influence were identified and using the DOE method, the necessary activities for changing negative influence were assigned. (authors)

  11. Operating performance and reliability of CANDU PHWR fuel channels in Canada

    International Nuclear Information System (INIS)

    Strachan, B.; Brown, D.R.

    1983-03-01

    CANDU nuclear plants use many small-diameter high-pressure fuel channels. Good operating performance from the CANDU fuel channels has made a major contribution to the world-leading operating record of the CANDU nuclear power plants. As of 1982 December 31, there were 7,480 fuel channels installed in 18 CANDU reactors over 500 MW(e) in size. Eight of these reactors have been declared in-service and have accumulated 24,000 fuel channel-years of operation. The only significant operating problems with fuel channels have been the occurrence of leaking cracks in 70 fuel channels and a larger amount of axial creep on the early reactors than was originally provided for in the design. Both of these problems have been corrected on all CANDU reactors built since the Bruce GS 'A' station and the newer reactors should exhibit even better performance

  12. Charging performance of automotive batteries-An underestimated factor influencing lifetime and reliable battery operation

    Science.gov (United States)

    Sauer, Dirk Uwe; Karden, Eckhard; Fricke, Birger; Blanke, Holger; Thele, Marc; Bohlen, Oliver; Schiffer, Julia; Gerschler, Jochen Bernhard; Kaiser, Rudi

    Dynamic charge acceptance and charge acceptance under constant voltage charging conditions are for two reasons essential for lead-acid battery operation: energy efficiency in applications with limited charging time (e.g. PV systems or regenerative braking in vehicles) and avoidance of accelerated ageing due to sulphation. Laboratory tests often use charge regimes which are beneficial for the battery life, but which differ significantly from the operating conditions in the field. Lead-acid batteries in applications with limited charging time and partial-state-of-charge operation are rarely fully charged due to their limited charge acceptance. Therefore, they suffer from sulphation and early capacity loss. However, when appropriate charging strategies are applied most of the lost capacity and thus performance for the user may be recovered. The paper presents several aspects of charging regimes and charge acceptance. Theoretical and experimental investigations show that temperature is the most critical parameter. Full charging within short times can be achieved only at elevated temperatures. A strong dependency of the charge acceptance during charging pulses on the pre-treatment of the battery can be observed, which is not yet fully understood. But these effects have a significant impact on the fuel efficiency of micro-hybrid electric vehicles.

  13. Deep Space Network equipment performance, reliability, and operations management information system

    Science.gov (United States)

    Cooper, T.; Lin, J.; Chatillon, M.

    2002-01-01

    The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

  14. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Hallam, J.W.; Spurgin, J.P.; Singh, A.

    1991-01-01

    The paper gives an overview of the OPERAS project. It discusses the background which led to the design of the PC-based data collection and analysis system connected to plant training simulators including those used for nuclear power plants. The usefulness of a system like OPERAS was perceived during an earlier EPRI project, the Operator Reliability Experiments project, by EPRI and PG and E. The data collection and analysis approaches used in OPERAS were developed during the ORE project. The paper not only discusses the design of OPERAS but discusses the functions performed and the current experiences with the two prototype systems. Also listed are potential uses of OPERAS by utility personnel in Operations, Training and PRA groups

  15. Operational safety performance indicator system - a management tool for the self assessment of safety and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Anil Kumar; Mandowara, S.L.; Mittal, S.

    2006-01-01

    Operational Safety Performance Indicator system is one of the self assessment tools for station management to monitor safety and reliability of nuclear power plants. It provides information to station management about the performance of various areas of the plants by means of different colours of relevant performance indicators. Such systems have been implemented at many nuclear power plants in the world and have been considered as strength during WANO Peer Review. IAEA had a Coordinated Research Programme (CRP) on this with several countries participating including India. In NPCIL this system has been implemented in KAPS about a year back and found very useful in identifying areas which needs to be given more attention. Based on the KAPS feedback Implementation of this system has been taken up in RAPS-3 and 4 and KGS-l and 2. (author)

  16. Validity and reliability of global operative assessment of laparoscopic skills (GOALS) in novice trainees performing a laparoscopic cholecystectomy.

    Science.gov (United States)

    Kramp, Kelvin H; van Det, Marc J; Hoff, Christiaan; Lamme, Bas; Veeger, Nic J G M; Pierie, Jean-Pierre E N

    2015-01-01

    Global Operative Assessment of Laparoscopic Skills (GOALS) assessment has been designed to evaluate skills in laparoscopic surgery. A longitudinal blinded study of randomized video fragments was conducted to estimate the validity and reliability of GOALS in novice trainees. In total, 10 trainees each performed 6 consecutive laparoscopic cholecystectomies. Sixty procedures were recorded on video. Video fragments of (1) opening of the peritoneum; (2) dissection of Calot's triangle and achievement of critical view of safety; and (3) dissection of the gallbladder from the liver bed were blinded, randomized, and rated by 2 consultant surgeons using GOALS. Also, a grade was given for overall competence. The correlation of GOALS with live observation Objective Structured Assessment of Technical Skills (OSATS) scores was calculated. Construct validity was estimated using the Friedman 2-way analysis of variance by ranks and the Wilcoxon signed-rank test. The interrater reliability was calculated using the absolute and consistency agreement 2-way random-effects model intraclass correlation coefficient. A high correlation was found between mean GOALS score (r = 0.879, p = 0.021) and mean OSATS score. The GOALS score increased significantly across the 6 procedures (p = 0.002). The trainees performed significantly better on their sixth when compared with their first cholecystectomy (p = 0.004). The consistency agreement interrater reliability was 0.37 for the mean GOALS score (p = 0.002) and 0.55 for overall competence (p < 0.001) of the 3 video fragments. The validity observed in this randomized blinded longitudinal study supports the existing evidence that GOALS is a valid tool for assessment of novice trainees. A relatively low reliability was found in this study. Copyright © 2014 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  17. Improvement of Steam Turbine Operational Performance and Reliability with using Modern Information Technologies

    Science.gov (United States)

    Brezgin, V. I.; Brodov, Yu M.; Kultishev, A. Yu

    2017-11-01

    The report presents improvement methods review in the fields of the steam turbine units design and operation based on modern information technologies application. In accordance with the life cycle methodology support, a conceptual model of the information support system during life cycle main stages (LC) of steam turbine unit is suggested. A classifying system, which ensures the creation of sustainable information links between the engineer team (manufacture’s plant) and customer organizations (power plants), is proposed. Within report, the principle of parameterization expansion beyond the geometric constructions at the design and improvement process of steam turbine unit equipment is proposed, studied and justified. The report presents the steam turbine unit equipment design methodology based on the brand new oil-cooler design system that have been developed and implemented by authors. This design system combines the construction subsystem, which is characterized by extensive usage of family tables and templates, and computation subsystem, which includes a methodology for the thermal-hydraulic zone-by-zone oil coolers design calculations. The report presents data about the developed software for operational monitoring, assessment of equipment parameters features as well as its implementation on five power plants.

  18. A reliability program approach to operational safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1985-01-01

    A Reliability Program (RP) model based on proven reliability techniques is being formulated for potential application in the nuclear power industry. Methods employed under NASA and military direction, commercial airline and related FAA programs were surveyed and a review of current nuclear risk-dominant issues conducted. The need for a reliability approach to address dependent system failures, operating and emergency procedures and human performance, and develop a plant-specific performance data base for safety decision making is demonstrated. Current research has concentrated on developing a Reliability Program approach for the operating phase of a nuclear plant's lifecycle. The approach incorporates performance monitoring and evaluation activities with dedicated tasks that integrate these activities with operation, surveillance, and maintenance of the plant. The detection, root-cause evaluation and before-the-fact correction of incipient or actual systems failures as a mechanism for maintaining plant safety is a major objective of the Reliability Program. (orig./HP)

  19. AREVA's toolbox for long-term best performance and reliable operation of nuclear steam generators

    International Nuclear Information System (INIS)

    Drexler, Andreas; Weiss, Steffen; Caris, Neil; Stiepani, Christoph

    2015-01-01

    Long-term integrity and high performance of major plant systems and components are of uppermost importance for the successful operation of any power plant. AREVA's experience gathered with water-steam cycle chemistry treatments in more than 40 years yields the conclusion: Accumulation of corrosion products in SGs may result in local overheating and enrichment of impurities up to critical levels. This can lead to several degradation phenomena of the structural materials of the SGs. Therefore, minimization of corrosion product generation and prevention of deposit accumulation is required. The objective of AREVA's asset management program is to support operators by minimizing corrosion damage and performance losses of water-steam cycle systems and components and thereby to maximize the availability and economic performance of the plant. Such asset management program is in principle a closed cycle process. It is based on control, corrective and preventive measures. The objective of control measure is deriving a widespread assessment of the corrosion status of the steam-water cycle which yields to weak points and identifying the best suited corrective and/or preventive measures. In the subsequent steps appropriate measures which improve the current status or counteract on identified issues are identified and applied. Corrective measures, likes mechanical and/or chemical cleaning are targeting the minimization of negative influence on plant performance caused by corrosion in the steam-water cycle. Complementary to corrective measures are preventive ones, like optimization of pH strategy and AREVA's FFA technology could by applied. They are focusing on the origin of corrosion product generation. AREVA is offering a toolbox for long-term best performance and reliable operation of NPPs. (author)

  20. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  1. Contribution of materials investigations and operating experience of reactor vessel internals to PWRs' safety, performance and reliability

    International Nuclear Information System (INIS)

    Lemaire, E.; Monteil, N.; Jardin, N.; Doll, M.

    2015-01-01

    The Reactor Pressure Vessel Internals (RVI) include all the components inside the pressure vessel, except the nuclear fuel, the rod cluster assemblies and the instrumentation. The RVI consist of bolted and welded structures that are divided into two sub-assemblies: the upper internals which are removed at every refueling outage and the lower internals which are systematically removed for inspection at every 10-year outage. The main functions of the RVI are to position the core, to support it, and to provide a coolant flow by channeling the fluid. Moreover, the lower internals contribute to a neutron protection of the reactor pressure vessel by absorbing most of the neutron flux from the core. Depending on their location and material composition, the RVI components can face different ageing phenomena, that are actual or potential (such as wear, fatigue, stress corrosion cracking, irradiation assisted stress corrosion cracking, hardening and loss of ductility due to neutron irradiation, irradiation creep and irradiation swelling). EDF has developed a strategy for managing ageing and demonstrating the capacity of the RVI to perform their design functions over 40 years of operation. This overall approach is periodically revisited to take into account the most recent knowledge obtained from the following main topics: Safety Analyses, Research-Development programs, In-Service Inspection (ISI) results, Maintenance programs and Metallurgical Examinations. Based on continuous improvements in those fields, the goal of this paper is to present the way that materials investigations and operating experience obtained on RVI are managed by EDF to improve RVI safety, performance and reliability. It is shown that a perspective of 60 years of operation of RVI components is supported by large Research-Development efforts combined with field experience. (authors)

  2. Operator reliability assessment system (OPERAS)

    International Nuclear Information System (INIS)

    Singh, A.; Spurgin, A.J.; Martin, T.; Welsch, J.; Hallam, J.W.

    1991-01-01

    OPERAS is a personal-computer (PC) based software to collect and process simulator data on control-room operators responses during requalification training scenarios. The data collection scheme is based upon approach developed earlier during the EPRI Operator Reliability Experiments project. The software allows automated data collection from simulator, thus minimizing simulator staff time and resources to collect, maintain and process data which can be useful in monitoring, assessing and enhancing the progress of crew reliability and effectiveness. The system is designed to provide the data and output information in the form of user-friendly charts, tables and figures for use by plant staff. OPERAS prototype software has been implemented at the Diablo Canyon (PWR) and Millstone (BWR) plants and is currently being used to collect operator response data. Data collected from similator include plant-state variables such as reactor pressure and temperature, malfunction, times at which annunciators are activated, operator actions and observations of crew behavior by training staff. The data and systematic analytical results provided by the OPERAS system can contribute to increase objectivity by the utility probabilistic risk analysis (PRA) and training staff in monitoring and assessing reliability of their crews

  3. Training benefits of research on operator reliability

    International Nuclear Information System (INIS)

    Worledge, D.H.

    1989-01-01

    The purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation which more realistically take credit for operator performance in preventing core damage. The three objectives in fulfilling this purpose are: to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators; to test the human cognitive reliability (HCR) correlation; and to develop a data collection analysis procedure. This paper discusses the background to this program, data collection and analysis, and the results of quantitative/qualitative insights stemming from initial work. Special attention is paid to how this program impacts upon simulator use and assessment of simulator fidelity. Attention is also paid to the use of data collection procedures to assist training departments in assessing the quality of their training programs

  4. Proof-of-Concept Demonstrations for Computation-Based Human Reliability Analysis. Modeling Operator Performance During Flooding Scenarios

    International Nuclear Information System (INIS)

    Joe, Jeffrey Clark; Boring, Ronald Laurids; Herberger, Sarah Elizabeth Marie; Mandelli, Diego; Smith, Curtis Lee

    2015-01-01

    The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program has the overall objective to help sustain the existing commercial nuclear power plants (NPPs). To accomplish this program objective, there are multiple LWRS 'pathways,' or research and development (R&D) focus areas. One LWRS focus area is called the Risk-Informed Safety Margin and Characterization (RISMC) pathway. Initial efforts under this pathway to combine probabilistic and plant multi-physics models to quantify safety margins and support business decisions also included HRA, but in a somewhat simplified manner. HRA experts at Idaho National Laboratory (INL) have been collaborating with other experts to develop a computational HRA approach, called the Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER), for inclusion into the RISMC framework. The basic premise of this research is to leverage applicable computational techniques, namely simulation and modeling, to develop and then, using RAVEN as a controller, seamlessly integrate virtual operator models (HUNTER) with 1) the dynamic computational MOOSE runtime environment that includes a full-scope plant model, and 2) the RISMC framework PRA models already in use. The HUNTER computational HRA approach is a hybrid approach that leverages past work from cognitive psychology, human performance modeling, and HRA, but it is also a significant departure from existing static and even dynamic HRA methods. This report is divided into five chapters that cover the development of an external flooding event test case and associated statistical modeling considerations.

  5. Proof-of-Concept Demonstrations for Computation-Based Human Reliability Analysis. Modeling Operator Performance During Flooding Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Joe, Jeffrey Clark [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald Laurids [Idaho National Lab. (INL), Idaho Falls, ID (United States); Herberger, Sarah Elizabeth Marie [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mandelli, Diego [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis Lee [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program has the overall objective to help sustain the existing commercial nuclear power plants (NPPs). To accomplish this program objective, there are multiple LWRS “pathways,” or research and development (R&D) focus areas. One LWRS focus area is called the Risk-Informed Safety Margin and Characterization (RISMC) pathway. Initial efforts under this pathway to combine probabilistic and plant multi-physics models to quantify safety margins and support business decisions also included HRA, but in a somewhat simplified manner. HRA experts at Idaho National Laboratory (INL) have been collaborating with other experts to develop a computational HRA approach, called the Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER), for inclusion into the RISMC framework. The basic premise of this research is to leverage applicable computational techniques, namely simulation and modeling, to develop and then, using RAVEN as a controller, seamlessly integrate virtual operator models (HUNTER) with 1) the dynamic computational MOOSE runtime environment that includes a full-scope plant model, and 2) the RISMC framework PRA models already in use. The HUNTER computational HRA approach is a hybrid approach that leverages past work from cognitive psychology, human performance modeling, and HRA, but it is also a significant departure from existing static and even dynamic HRA methods. This report is divided into five chapters that cover the development of an external flooding event test case and associated statistical modeling considerations.

  6. Validity, Reliability, and Performance Determinants of a New Job-Specific Anaerobic Work Capacity Test for the Norwegian Navy Special Operations Command.

    Science.gov (United States)

    Angeltveit, Andreas; Paulsen, Gøran; Solberg, Paul A; Raastad, Truls

    2016-02-01

    Operators in Special Operation Forces (SOF) have a particularly demanding profession where physical and psychological capacities can be challenged to the extremes. The diversity of physical capacities needed depend on the mission. Consequently, tests used to monitor SOF operators' physical fitness should cover a broad range of physical capacities. Whereas tests for strength and aerobic endurance are established, there is no test for specific anaerobic work capacity described in the literature. The purpose of this study was therefore to evaluate the reliability, validity, and to identify performance determinants of a new test developed for testing specific anaerobic work capacity in SOF operators. Nineteen active young students were included in the concurrent validity part of the study. The students performed the evacuation (EVAC) test 3 times and the results were compared for reliability and with performance in the Wingate cycle test, 300-m sprint, and a maximal accumulated oxygen deficit (MAOD) test. In part II of the study, 21 Norwegian Navy Special Operations Command operators conducted the EVAC test, anthropometric measurements, a dual x-ray absorptiometry scan, leg press, isokinetic knee extensions, maximal oxygen uptake test, and countermovement jump (CMJ) test. The EVAC test showed good reliability after 1 familiarization trial (intraclass correlation = 0.89; coefficient of variance = 3.7%). The EVAC test correlated well with the Wingate test (r = -0.68), 300-m sprint time (r = 0.51), and 300-m mean power (W) (r = -0.67). No significant correlation was found with the MAOD test. In part II of the study, height, body mass, lean body mass, isokinetic knee extension torque, maximal oxygen uptake, and maximal power in a CMJ was significantly correlated with performance in the EVAC test. The EVAC test is a reliable and valid test for anaerobic work capacity for SOF operators, and muscle mass, leg strength, and leg power seem to be the most important determinants

  7. Human reliability analysis of control room operators

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Isaac J.A.L.; Carvalho, Paulo Victor R.; Grecco, Claudio H.S. [Instituto de Engenharia Nuclear (IEN), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Human reliability is the probability that a person correctly performs some system required action in a required time period and performs no extraneous action that can degrade the system Human reliability analysis (HRA) is the analysis, prediction and evaluation of work-oriented human performance using some indices as human error likelihood and probability of task accomplishment. Significant progress has been made in the HRA field during the last years, mainly in nuclear area. Some first-generation HRA methods were developed, as THERP (Technique for human error rate prediction). Now, an array of called second-generation methods are emerging as alternatives, for instance ATHEANA (A Technique for human event analysis). The ergonomics approach has as tool the ergonomic work analysis. It focus on the study of operator's activities in physical and mental form, considering at the same time the observed characteristics of operator and the elements of the work environment as they are presented to and perceived by the operators. The aim of this paper is to propose a methodology to analyze the human reliability of the operators of industrial plant control room, using a framework that includes the approach used by ATHEANA, THERP and the work ergonomics analysis. (author)

  8. MHTGR thermal performance envelopes: Reliability by design

    International Nuclear Information System (INIS)

    Etzel, K.T.; Howard, W.W.; Zgliczynski, J.B.

    1992-05-01

    This document discusses thermal performance envelopes which are used to specify steady-state design requirements for the systems of the Modular High Temperature Gas-Cooled Reactor to maximize plant performance reliability with optimized design. The thermal performance envelopes are constructed around the expected operating point accounting for uncertainties in actual plant as-built parameters and plant operation. The components are then designed to perform successfully at all points within the envelope. As a result, plant reliability is maximized by accounting for component thermal performance variation in the design. The design is optimized by providing a means to determine required margins in a disciplined and visible fashion

  9. Delivering high performance BWR fuel reliably

    International Nuclear Information System (INIS)

    Schardt, J.F.

    1998-01-01

    Utilities are under intense pressure to reduce their production costs in order to compete in the increasingly deregulated marketplace. They need fuel, which can deliver high performance to meet demanding operating strategies. GE's latest BWR fuel design, GE14, provides that high performance capability. GE's product introduction process assures that this performance will be delivered reliably, with little risk to the utility. (author)

  10. Photovoltaic performance and reliability workshop

    Energy Technology Data Exchange (ETDEWEB)

    Mrig, L. [ed.

    1993-12-01

    This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

  11. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  12. Impact of staffing parameters on operational reliability

    International Nuclear Information System (INIS)

    Hahn, H.A.; Houghton, F.K.

    1993-01-01

    This paper reports on a project related to human resource management of the Department of Energy's (DOE's) High-Level Waste (HLW) Tank program. Safety and reliability of waste tank operations is impacted by several issues, including not only the design of the tanks themselves, but also how operations and operational personnel are managed. As demonstrated by management assessments performed by the Tiger Teams, DOE believes that the effective use of human resources impacts environment safety, and health concerns. For the of the current paper, human resource management activities are identified as ''Staffing'' and include the of developing the functional responsibilities and qualifications of technical and administrative personnel. This paper discusses the importance of staff plans and management in the overall view of safety and reliability. The work activities and procedures associated with the project, a review of the results of these activities, including a summary of the literature and a preliminary analysis of the data. We conclude that although identification of staffing issues and the development of staffing plans contributes to the overall reliability and safety of the HLW tanks, the relationship is not well understood and is in need of further development

  13. Impact of staffing parameters on operational reliability

    International Nuclear Information System (INIS)

    Hahn, H.A.; Houghton, F.K.

    1993-01-01

    This paper reports on a project related to human resource management of the Department of Energy (DOEs) High-Level Waste (HLW) Tank program. Safety and reliability of waste tank operations is impacted by several issues, including not only the design of the tanks themselves, but also how operations and operational personnel are managed. As demonstrated by management assessments performed by the Tiger Teams, DOE believes that the effective use of human resources impacts environment, safety, and health concerns. For the purposes of the current paper, human resource management activities are identified as 'Staffing' and include the process of developing the functional responsibilities and qualifications of technical and administrative personnel. This paper discusses the importance of staff plans and management in the overall view of safety and reliability, the work activities and procedures associated with the project, a review of the results of these activities, including a summary of the literature and a preliminary analysis of the data. We conclude that, although identification of staffing issues and the development of staffing plans contributes to the overall reliability and safety of the HLW tanks, the relationship is not well understood and is in need of further development

  14. ARCHITECTURE AND RELIABILITY OF OPERATING SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav V. Nazarov

    2018-03-01

    Full Text Available Progress in the production technology of microprocessors significantly increased reliability and performance of the computer systems hardware. It cannot be told about the corresponding characteristics of the software and its basis – the operating system (OS. Some achievements of program engineering are more modest in this field. Both directions of OS improvement (increasing of productivity and reliability are connected with the development of effective structures of these systems. OS functional complexity leads to the multiplicity of the structure, which is further enhanced by the specialization of the operating system depending on scope of computer system (complex scientific calculations, real time, information retrieval systems, systems of the automated and automatic control, etc. The functional complexity of the OS leads to the complexity of its architecture, which is further enhanced by the specialization of the operating system, depending on the computer system application area (complex scientific calculations, real-time, information retrieval systems, automated and automatic control systems, etc.. That fact led to variety of modern OS. It is possible to estimate reliability of different OS structures only as results of long-term field experiment or simulation modeling. However it is most often unacceptable because of time and funds expenses for carrying out such research. This survey attempts to evaluate the reliability of two main OS architectures: large multi-layered modular core and a multiserver (client-server system. Represented by continuous Markov chains which are explored in the stationary mode on the basis of transition from systems of the differential equations of Kolmogorov to system of the linear algebraic equations, models of these systems are developed.

  15. Can We Make Operating Systems Reliable and Secure?

    NARCIS (Netherlands)

    Tanenbaum, A.S.; Herder, J.N.; Bos, H.J.

    2006-01-01

    Microkernels--long discarded as unacceptable because of their lower performance compared with monolithic kernels--might be making a comeback in operating systems due to their potentially higher reliability, which many researchers now regard as more important than performance.

  16. Delivering high performance BWR fuel reliably

    Energy Technology Data Exchange (ETDEWEB)

    Schardt, J.F. [GE Nuclear Energy, Wilmington, NC (United States)

    1998-07-01

    Utilities are under intense pressure to reduce their production costs in order to compete in the increasingly deregulated marketplace. They need fuel, which can deliver high performance to meet demanding operating strategies. GE's latest BWR fuel design, GE14, provides that high performance capability. GE's product introduction process assures that this performance will be delivered reliably, with little risk to the utility. (author)

  17. Product reliability and the reliability of its emanating operational processes.

    NARCIS (Netherlands)

    Sonnemans, P.J.M.; Geudens, W.H.J.M.

    1999-01-01

    This paper addresses the problem of proper reliability management in business operations today, facing increasing demands on essential business drivers such as time to market, quality and financial profit. In this paper a general method is described of how to achieve product quality in a highly

  18. Method to improve reliability of a fuel cell system using low performance cell detection at low power operation

    Science.gov (United States)

    Choi, Tayoung; Ganapathy, Sriram; Jung, Jaehak; Savage, David R.; Lakshmanan, Balasubramanian; Vecasey, Pamela M.

    2013-04-16

    A system and method for detecting a low performing cell in a fuel cell stack using measured cell voltages. The method includes determining that the fuel cell stack is running, the stack coolant temperature is above a certain temperature and the stack current density is within a relatively low power range. The method further includes calculating the average cell voltage, and determining whether the difference between the average cell voltage and the minimum cell voltage is greater than a predetermined threshold. If the difference between the average cell voltage and the minimum cell voltage is greater than the predetermined threshold and the minimum cell voltage is less than another predetermined threshold, then the method increments a low performing cell timer. A ratio of the low performing cell timer and a system run timer is calculated to identify a low performing cell.

  19. Uniting Evidence-Based Evaluation with the ACGME Plastic Surgery Milestones: A Simple and Reliable Assessment of Resident Operative Performance.

    Science.gov (United States)

    Kobraei, Edward M; Bohnen, Jordan D; George, Brian C; Mullen, John T; Lillemoe, Keith D; Austen, William G; Liao, Eric C

    2016-08-01

    Milestones evaluations in plastic surgery reflect a shift toward competency-based training but have created a number of challenges. The authors have incorporated the smartphone application evaluation tool, System for Improving and Measuring Procedural Learning (SIMPL), that was recently developed by a multi-institutional research collaborative. In this pilot study, the authors hypothesize that SIMPL can improve resident evaluation and also collect granular performance data to simplify compliance with the plastic surgery Milestones. SIMPL was prospectively piloted with a plastic surgery resident and faculty surgeon at Massachusetts General Hospital in this institutional review board-approved study. The study period was a 2-month interval corresponding to the resident's rotation. The resident-faculty combination performed 20 cases together. All cases were evaluated with SIMPL. SIMPL evaluations uniformly took under 1 minute to submit. The average time to completed evaluation from surgery completion was 5 hours (technology will support a shared vocabulary between residents and faculty to enhance intraoperative education.

  20. The fair value of operational reliability

    International Nuclear Information System (INIS)

    Patino-Echeverri, Dalia; Morel, Benoit

    2005-01-01

    Information about the uncertainties that surround the operation of the power system can be used to enlighten the debate of how much reliability should be pursued and how resources should be allocated to pursue it. In this paper we present a method to determine the value of having flexible generators to react to load fluctuations. This value can be seen as the value of hedging against the uncertainty on the load due to the volatility of the demand and the possibility of congestion. Because having this flexibility can be related to a financial option, we will use an extension of options theory and in particular the risk-neutral valuation method, to find a risk neutral quantification of its value. We illustrate our point valuing the flexibility that leads to ''operational reliability'' in the PJM market. Our formula for that value is what we call ''the fair value'' of operational reliability. (Author)

  1. Overall Key Performance Indicator to Optimizing Operation of High-Pressure Homogenizers for a Reliable Quantification of Intracellular Components in Pichia pastoris.

    Science.gov (United States)

    Garcia-Ortega, Xavier; Reyes, Cecilia; Montesinos, José Luis; Valero, Francisco

    2015-01-01

    The most commonly used cell disruption procedures may present lack of reproducibility, which introduces significant errors in the quantification of intracellular components. In this work, an approach consisting in the definition of an overall key performance indicator (KPI) was implemented for a lab scale high-pressure homogenizer (HPH) in order to determine the disruption settings that allow the reliable quantification of a wide sort of intracellular components. This innovative KPI was based on the combination of three independent reporting indicators: decrease of absorbance, release of total protein, and release of alkaline phosphatase activity. The yeast Pichia pastoris growing on methanol was selected as model microorganism due to it presents an important widening of the cell wall needing more severe methods and operating conditions than Escherichia coli and Saccharomyces cerevisiae. From the outcome of the reporting indicators, the cell disruption efficiency achieved using HPH was about fourfold higher than other lab standard cell disruption methodologies, such bead milling cell permeabilization. This approach was also applied to a pilot plant scale HPH validating the methodology in a scale-up of the disruption process. This innovative non-complex approach developed to evaluate the efficacy of a disruption procedure or equipment can be easily applied to optimize the most common disruption processes, in order to reach not only reliable quantification but also recovery of intracellular components from cell factories of interest.

  2. Operator adaptation to changes in system reliability under adaptable automation.

    Science.gov (United States)

    Chavaillaz, Alain; Sauer, Juergen

    2017-09-01

    This experiment examined how operators coped with a change in system reliability between training and testing. Forty participants were trained for 3 h on a complex process control simulation modelling six levels of automation (LOA). In training, participants either experienced a high- (100%) or low-reliability system (50%). The impact of training experience on operator behaviour was examined during a 2.5 h testing session, in which participants either experienced a high- (100%) or low-reliability system (60%). The results showed that most operators did not often switch between LOA. Most chose an LOA that relieved them of most tasks but maintained their decision authority. Training experience did not have a strong impact on the outcome measures (e.g. performance, complacency). Low system reliability led to decreased performance and self-confidence. Furthermore, complacency was observed under high system reliability. Overall, the findings suggest benefits of adaptable automation because it accommodates different operator preferences for LOA. Practitioner Summary: The present research shows that operators can adapt to changes in system reliability between training and testing sessions. Furthermore, it provides evidence that each operator has his/her preferred automation level. Since this preference varies strongly between operators, adaptable automation seems to be suitable to accommodate these large differences.

  3. Reliability of operating WWER monitoring systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.A.; Goldrin, V.M.; Garagulya, A.V.

    1996-01-01

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs

  4. Reliability of operating WWER monitoring systems

    Energy Technology Data Exchange (ETDEWEB)

    Yastrebenetsky, M A; Goldrin, V M; Garagulya, A V [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety, Kharkov (Ukraine). Instrumentation and Control Systems Dept.

    1997-12-31

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs.

  5. Optimum reliable operation of water distribution networks by ...

    African Journals Online (AJOL)

    In recent decades much attention has been paid to optimal operation of water distribution networks (WDNs). In this regard, the system operation costs, including energy and disinfection chemicals, as well as system reliability should be simultaneously considered in system performance optimisation, to provide the minimum ...

  6. RFA-based 589-nm guide star lasers for ESO VLT: a paradigm shift in performance, operational simplicity, reliability, and maintenance

    Science.gov (United States)

    Friedenauer, Axel; Karpov, Vladimir; Wei, Daoping; Hager, Manfred; Ernstberger, Bernhard; Clements, Wallace R. L.; Kaenders, Wilhelm G.

    2012-07-01

    Large telescopes equipped with adaptive optics require 20-25W CW 589-nm sources with emission linewidths of ~5 MHz. These Guide Star (GS) lasers should also be highly reliable and simple to operate and maintain for many years at the top of a mountain facility. Under contract from ESO, industrial partners TOPTICA and MPBC are nearing completion of the development of GS lasers for the ESO VLT, with delivery of the first of four units scheduled for December 2012. We report on the design and performance of the fully-engineered Pre-Production Unit (PPU), including system reliability/availability analysis, the successfully-concluded qualification testing, long-term component and system level tests and long-term maintenance and support planning. The chosen approach is based on ESO's patented narrow-band Raman Fiber Amplifier (EFRA) technology. A master oscillator signal from a linearly-polarized TOPTICA 20-mW, 1178-nm CW diode laser, with stabilized emission frequency and controllable linewidth up to a few MHz, is amplified in an MPBC polarization-maintaining (PM) RFA pumped by a high-power 1120-nm PM fiber laser. With efficient stimulated Brillouin scattering suppression, an unprecedented 40W of narrow-band RFA output has been obtained. This is then mode-matched into a resonant-cavity doubler with a free-spectral-range matching the sodium D2a to D2b separation, allowing simultaneous generation of an additional frequency component (D2b line) to re-pump the sodium atom electronic population. With this technique, the return flux can be increased without having to resort to electro-optical modulators and without the risk of introducing optical wave front distortions. The demonstrated output powers with doubling efficiencies >80% at 589 nm easily exceed the 20W design goal and require less than 700 W of electrical power. In summary, the fiber-based guide star lasers provide excellent beam quality and are modular, turn-key, maintenance-free, reliable, efficient, and ruggedized

  7. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  8. The fair value of operational reliability

    Energy Technology Data Exchange (ETDEWEB)

    Patino-Echeverri, Dalia; Morel, Benoit

    2005-12-15

    Information about the uncertainties that surround the operation of the power system can be used to enlighten the debate of how much reliability should be pursued and how resources should be allocated to pursue it. In this paper we present a method to determine the value of having flexible generators to react to load fluctuations. This value can be seen as the value of hedging against the uncertainty on the load due to the volatility of the demand and the possibility of congestion. Because having this flexibility can be related to a financial option, we will use an extension of options theory and in particular the risk-neutral valuation method, to find a risk neutral quantification of its value. We illustrate our point valuing the flexibility that leads to ''operational reliability'' in the PJM market. Our formula for that value is what we call ''the fair value'' of operational reliability. (Author)

  9. Relativity evaluation of reliability on operation in nuclear power plant

    International Nuclear Information System (INIS)

    Inata, Takashi

    1987-01-01

    The report presents a quantitative method for evaluating the reliability of operations conducted in nuclear power plants. The quantitative reliability evaluation method is based on the 'detailed block diagram analysis (De-BDA)'. All units of a series of operations are separately displayed for each block and combined sequentially. Then, calculation is performed to evaluate the reliability. Basically, De-BDA calculation is made for pairs of operation labels, which are connected in parallel or in series at different subordination levels. The applicability of the De-BDA method is demonstrated by carrying out calculation for three model cases: operations in the event of malfunction of the control valve in the main water supply system for PWR, switching from an electrically-operated water supply pump to a turbin-operated water supply pump, and isolation and water removal operation for a low-pressure condensate pump. It is shown that the relative importance of each unit of a series of operations can be evaluated, making it possible to extract those units of greater importance, and that the priority among the factors which affect the reliability of operations can be determined. Results of the De-BDA calculation can serve to find important points to be considered in developing an operation manual, conducting education and training, and improving facilities. (Nogami, K.)

  10. System Reliability Analysis Considering Correlation of Performances

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Saekyeol; Lee, Tae Hee [Hanyang Univ., Seoul (Korea, Republic of); Lim, Woochul [Mando Corporation, Seongnam (Korea, Republic of)

    2017-04-15

    Reliability analysis of a mechanical system has been developed in order to consider the uncertainties in the product design that may occur from the tolerance of design variables, uncertainties of noise, environmental factors, and material properties. In most of the previous studies, the reliability was calculated independently for each performance of the system. However, the conventional methods cannot consider the correlation between the performances of the system that may lead to a difference between the reliability of the entire system and the reliability of the individual performance. In this paper, the joint probability density function (PDF) of the performances is modeled using a copula which takes into account the correlation between performances of the system. The system reliability is proposed as the integral of joint PDF of performances and is compared with the individual reliability of each performance by mathematical examples and two-bar truss example.

  11. System Reliability Analysis Considering Correlation of Performances

    International Nuclear Information System (INIS)

    Kim, Saekyeol; Lee, Tae Hee; Lim, Woochul

    2017-01-01

    Reliability analysis of a mechanical system has been developed in order to consider the uncertainties in the product design that may occur from the tolerance of design variables, uncertainties of noise, environmental factors, and material properties. In most of the previous studies, the reliability was calculated independently for each performance of the system. However, the conventional methods cannot consider the correlation between the performances of the system that may lead to a difference between the reliability of the entire system and the reliability of the individual performance. In this paper, the joint probability density function (PDF) of the performances is modeled using a copula which takes into account the correlation between performances of the system. The system reliability is proposed as the integral of joint PDF of performances and is compared with the individual reliability of each performance by mathematical examples and two-bar truss example.

  12. Simulator experiments on operator reliability and training effectiveness

    International Nuclear Information System (INIS)

    Singh, A. Spurgin, A.J.

    1990-01-01

    This paper discusses some aspects of the Operator Reliability Experiments project sponsored by Electric Power Research Institute. The paper deals with modifications to the HCR correlation which have resulted from the study of operators in responding to nuclear accident scenarios using emergency procedures. The interpretation of time response data and how insights in crew performance can lead to improvements in not only crew performance but also in training effectiveness are discussed

  13. Enhancing operability and reliability through configuration management

    International Nuclear Information System (INIS)

    Hancock, L.R.

    1993-01-01

    This paper describes the evolution of plant design control techniques from the early 1970's to today's operating environment that demands accurate, up-to-date design data. This evolution of design control is responsible for the increasingly troublesome scenario of design data being very difficult to locate and when found, its credibility is questioned. The design information could be suspect because there are discrepancies between two or more source documents or there is a difference between the design documents and the physical configuration of the plant. This paper discusses the impact these design control problems are having on plant operations and presents common sense solutions for improving configuration management techniques to ultimately enhance operability and reliability

  14. Database reliability engineering designing and operating resilient database systems

    CERN Document Server

    Campbell, Laine

    2018-01-01

    The infrastructure-as-code revolution in IT is also affecting database administration. With this practical book, developers, system administrators, and junior to mid-level DBAs will learn how the modern practice of site reliability engineering applies to the craft of database architecture and operations. Authors Laine Campbell and Charity Majors provide a framework for professionals looking to join the ranks of today’s database reliability engineers (DBRE). You’ll begin by exploring core operational concepts that DBREs need to master. Then you’ll examine a wide range of database persistence options, including how to implement key technologies to provide resilient, scalable, and performant data storage and retrieval. With a firm foundation in database reliability engineering, you’ll be ready to dive into the architecture and operations of any modern database. This book covers: Service-level requirements and risk management Building and evolving an architecture for operational visibility ...

  15. Prediction of software operational reliability using testing environment factors

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Seong, Poong Hyun

    1995-01-01

    A number of software reliability models have been developed to estimate and to predict software reliability. However, there are no established standard models to quantify software reliability. Most models estimate the quality of software in reliability figures such as remaining faults, failure rate, or mean time to next failure at the testing phase, and they consider them ultimate indicators of software reliability. Experience shows that there is a large gap between predicted reliability during development and reliability measured during operation, which means that predicted reliability, or so-called test reliability, is not operational reliability. Customers prefer operational reliability to test reliability. In this study, we propose a method that predicts operational reliability rather than test reliability by introducing the testing environment factor that quantifies the changes in environments

  16. Improving inspection reliability through operator selection and training

    International Nuclear Information System (INIS)

    McGrath, Bernard; Carter, Luke

    2013-01-01

    A number of years ago the UK's Health and Safety Executive sponsored a series of three PANI projects investigating the application of manual ultrasonics, which endeavoured to establish the necessary steps that ensure a reliable inspection is performed. The results of the three projects were each reported separately on completion and also presented at number of international conferences. This paper summarises the results of these projects from the point of view of operator performance. The correlation of operator ultrasonic performance with results of aptitude tests is presented along with observations on the impact of training and qualifications of the operators. The results lead to conclusions on how the selection and training of operators could be modified to improve reliability of inspections.

  17. Measurement-based reliability/performability models

    Science.gov (United States)

    Hsueh, Mei-Chen

    1987-01-01

    Measurement-based models based on real error-data collected on a multiprocessor system are described. Model development from the raw error-data to the estimation of cumulative reward is also described. A workload/reliability model is developed based on low-level error and resource usage data collected on an IBM 3081 system during its normal operation in order to evaluate the resource usage/error/recovery process in a large mainframe system. Thus, both normal and erroneous behavior of the system are modeled. The results provide an understanding of the different types of errors and recovery processes. The measured data show that the holding times in key operational and error states are not simple exponentials and that a semi-Markov process is necessary to model the system behavior. A sensitivity analysis is performed to investigate the significance of using a semi-Markov process, as opposed to a Markov process, to model the measured system.

  18. 76 FR 42534 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits; System...

    Science.gov (United States)

    2011-07-19

    ... Reliability Operating Limits; System Restoration Reliability Standards AGENCY: Federal Energy Regulatory... data necessary to analyze and monitor Interconnection Reliability Operating Limits (IROL) within its... Interconnection Reliability Operating Limits, Order No. 748, 134 FERC ] 61,213 (2011). \\2\\ The term ``Wide-Area...

  19. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  20. Mobility and reliability performance measurement.

    Science.gov (United States)

    2013-06-01

    This project grew out of the fact that mobility was identified early on as one of the key performance focus areas of NCDOTs : strategic transformation effort. The Transformation Management Team (TMT) established a TMT Mobility Workstream Team : in...

  1. Advanced solutions for operational reliability improvements

    Energy Technology Data Exchange (ETDEWEB)

    Holmberg, K [VTT Manufacturing Technology, Espoo (Finland)

    1998-12-31

    A great number of new technical tools are today developed for improved operational reliability of machines and industrial equipment. Examples of such techniques and tools recently developed at the Technical Research Centre of Finland (VTT) are: metallographic approach for steam-piping lifetime estimation, an expert system AURORA for corrosion prediction and material selection, an automatic image-processing-based on-line wear particle analysis system, microsensors for condition monitoring, a condition monitoring and expert system, CEPDIA, for the diagnosis of centrifugal pumps, a machine tool analysis and diagnostic expert system, non-leakage magnetic fluid seals with extended lifetime and diamond-like surface coatings on components with decreased friction and wear properties. A hyperbook-supported holistic approach to problem solving in maintenance and reliability engineering has been developed to help the user achieve a holistic understanding of the problem and its relationships, to navigate among the several technical tools and methods available, and to find those suitable for his application. (orig.)

  2. Advanced solutions for operational reliability improvements

    Energy Technology Data Exchange (ETDEWEB)

    Holmberg, K. [VTT Manufacturing Technology, Espoo (Finland)

    1997-12-31

    A great number of new technical tools are today developed for improved operational reliability of machines and industrial equipment. Examples of such techniques and tools recently developed at the Technical Research Centre of Finland (VTT) are: metallographic approach for steam-piping lifetime estimation, an expert system AURORA for corrosion prediction and material selection, an automatic image-processing-based on-line wear particle analysis system, microsensors for condition monitoring, a condition monitoring and expert system, CEPDIA, for the diagnosis of centrifugal pumps, a machine tool analysis and diagnostic expert system, non-leakage magnetic fluid seals with extended lifetime and diamond-like surface coatings on components with decreased friction and wear properties. A hyperbook-supported holistic approach to problem solving in maintenance and reliability engineering has been developed to help the user achieve a holistic understanding of the problem and its relationships, to navigate among the several technical tools and methods available, and to find those suitable for his application. (orig.)

  3. Reliability Considerations for the Operation of Large Accelerator User Facilities

    CERN Document Server

    Willeke, F.J.

    2016-01-01

    The lecture provides an overview of considerations relevant for achieving highly reliable operation of accelerator based user facilities. The article starts with an overview of statistical reliability formalism which is followed by high reliability design considerations with examples. The article closes with operational aspects of high reliability such as preventive maintenance and spares inventory.

  4. Internet Performance and Reliability Measurements

    International Nuclear Information System (INIS)

    Cottrell, Les

    2003-01-01

    Collaborative HEP research is dependent on good Internet connectivity. Although most local- and wide-area networks are carefully watched, there is little monitoring of connections that cross many networks. This paper describes work in progress at several sites to monitor Internet end-to-end performance between hundreds of HEP sites worldwide. At each collection site, ICMP ping packets are automatically sent periodically to sites of interest. The data is recorded and made available to analysis nodes, which collect the data from multiple collection sites and provide analysis and graphing. Future work includes improving the efficiency and accuracy of ping data collection

  5. Prediction of software operational reliability using testing environment factors

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Seong, Poong Hyun

    1995-01-01

    For many years, many researches have focused on the quantification of software reliability and there are many models developed to quantify software reliability. Most software reliability models estimate the reliability with the failure data collected during the test assuming that the test environments well represent the operation profile. The experiences show that the operational reliability is higher than the test reliability User's interest is on the operational reliability rather than on the test reliability, however. With the assumption that the difference in reliability results from the change of environment, testing environment factors comprising the aging factor and the coverage factor are defined in this study to predict the ultimate operational reliability with the failure data. It is by incorporating test environments applied beyond the operational profile into testing environment factors. The application results are close to the actual data

  6. A study of operational and testing reliability in software reliability analysis

    International Nuclear Information System (INIS)

    Yang, B.; Xie, M.

    2000-01-01

    Software reliability is an important aspect of any complex equipment today. Software reliability is usually estimated based on reliability models such as nonhomogeneous Poisson process (NHPP) models. Software systems are improving in testing phase, while it normally does not change in operational phase. Depending on whether the reliability is to be predicted for testing phase or operation phase, different measure should be used. In this paper, two different reliability concepts, namely, the operational reliability and the testing reliability, are clarified and studied in detail. These concepts have been mixed up or even misused in some existing literature. Using different reliability concept will lead to different reliability values obtained and it will further lead to different reliability-based decisions made. The difference of the estimated reliabilities is studied and the effect on the optimal release time is investigated

  7. MEASUREMENT: ACCOUNTING FOR RELIABILITY IN PERFORMANCE ESTIMATES.

    Science.gov (United States)

    Waterman, Brian; Sutter, Robert; Burroughs, Thomas; Dunagan, W Claiborne

    2014-01-01

    When evaluating physician performance measures, physician leaders are faced with the quandary of determining whether departures from expected physician performance measurements represent a true signal or random error. This uncertainty impedes the physician leader's ability and confidence to take appropriate performance improvement actions based on physician performance measurements. Incorporating reliability adjustment into physician performance measurement is a valuable way of reducing the impact of random error in the measurements, such as those caused by small sample sizes. Consequently, the physician executive has more confidence that the results represent true performance and is positioned to make better physician performance improvement decisions. Applying reliability adjustment to physician-level performance data is relatively new. As others have noted previously, it's important to keep in mind that reliability adjustment adds significant complexity to the production, interpretation and utilization of results. Furthermore, the methods explored in this case study only scratch the surface of the range of available Bayesian methods that can be used for reliability adjustment; further study is needed to test and compare these methods in practice and to examine important extensions for handling specialty-specific concerns (e.g., average case volumes, which have been shown to be important in cardiac surgery outcomes). Moreover, it's important to note that the provider group average as a basis for shrinkage is one of several possible choices that could be employed in practice and deserves further exploration in future research. With these caveats, our results demonstrate that incorporating reliability adjustment into physician performance measurements is feasible and can notably reduce the incidence of "real" signals relative to what one would expect to see using more traditional approaches. A physician leader who is interested in catalyzing performance improvement

  8. Thermal Performance and Reliability Analysis of Single-Phase PV Inverters with Reactive Power Injection Outside Feed-In Operating Hours

    DEFF Research Database (Denmark)

    Anurag, Anup; Yang, Yongheng; Blaabjerg, Frede

    2015-01-01

    Reactive power support by photovoltaic (PV) systems is of increasingly interest, when compared to the conventional reactive power compensation devices. PV inverters can exchange reactive power with the utility grid in a decentralized manner even outside feed-in operation, especially at nights when...... there is no solar irradiance. However, reactive power injection causes additional power losses in the switching components leading to a temperature rise in the devices. Thus, this paper analyses the impact of reactive power injection by PV inverters outside feed-in operation on the thermal performance...... of their power switching components. A thermal analysis based on the mission profile (i.e., solar irradiance and ambient temperature) has been incorporated, so as to determine the additional temperature rise in the components induced by the operation outside feed-in hours. An analytical lifetime model has been...

  9. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  10. Achieving High Reliability Operations Through Multi-Program Integration

    Energy Technology Data Exchange (ETDEWEB)

    Holly M. Ashley; Ronald K. Farris; Robert E. Richards

    2009-04-01

    Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INL’s primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

  11. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  12. Operational reliability management; Gestao da confiabilidade operacional

    Energy Technology Data Exchange (ETDEWEB)

    Bressan, Edemir [Refinaria Alberto Pasqualini (REFAP), Canoas, RS (Brazil). Setor de Tecnologia de Equipamentos

    2000-07-01

    It is described the PETROBRAS Alberto Pasqualini Refinery process plant reliability management, strategies, maintenance organizational structure, management processes, predictive and preventive maintenance, condition monitoring techniques, reliability metrics, pointing out a need for close work relationship between production, maintenance and project engineering functions with highly qualified and committed proper teams, in order to reach one of the highest mechanical availability among Latin America refineries. (author)

  13. ANALYSIS OF AVAILABILITY AND RELIABILITY IN RHIC OPERATIONS

    International Nuclear Information System (INIS)

    PILAT, F.; INGRASSIA, P.; MICHNOFF, R.

    2006-01-01

    RHIC has been successfully operated for 5 years as a collider for different species, ranging from heavy ions including gold and copper, to polarized protons. We present a critical analysis of reliability data for RHIC that not only identifies the principal factors limiting availability but also evaluates critical choices at design times and assess their impact on present machine performance. RHIC availability data are typical when compared to similar high-energy colliders. The critical analysis of operations data is the basis for studies and plans to improve RHIC machine availability beyond the 50-60% typical of high-energy colliders

  14. Prediction of safety critical software operational reliability from test reliability using testing environment factors

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Seong, Poong Hyun

    1999-01-01

    It has been a critical issue to predict the safety critical software reliability in nuclear engineering area. For many years, many researches have focused on the quantification of software reliability and there have been many models developed to quantify software reliability. Most software reliability models estimate the reliability with the failure data collected during the test assuming that the test environments well represent the operation profile. User's interest is however on the operational reliability rather than on the test reliability. The experiences show that the operational reliability is higher than the test reliability. With the assumption that the difference in reliability results from the change of environment, from testing to operation, testing environment factors comprising the aging factor and the coverage factor are developed in this paper and used to predict the ultimate operational reliability with the failure data in testing phase. It is by incorporating test environments applied beyond the operational profile into testing environment factors. The application results show that the proposed method can estimate the operational reliability accurately. (Author). 14 refs., 1 tab., 1 fig

  15. Reliability studies of high operating temperature MCT photoconductor detectors

    Science.gov (United States)

    Wang, Wei; Xu, Jintong; Zhang, Yan; Li, Xiangyang

    2010-10-01

    This paper concerns HgCdTe (MCT) infrared photoconductor detectors with high operating temperature. The near room temperature operation of detectors have advantages of light weight, less cost and convenient usage. Their performances are modest and they suffer from reliable problems. These detectors face with stability of the package, chip bonding area and passivation layers. It's important to evaluate and improve the reliability of such detectors. Defective detectors were studied with SEM(Scanning electron microscope) and microscopy. Statistically significant differences were observed between the influence of operating temperature and the influence of humidity. It was also found that humility has statistically significant influence upon the stability of the chip bonding and passivation layers, and the amount of humility isn't strongly correlated to the damage on the surface. Considering about the commonly found failures modes in detectors, special test structures were designed to improve the reliability of detectors. An accelerated life test was also implemented to estimate the lifetime of the high operating temperature MCT photoconductor detectors.

  16. Analytical modeling of nuclear power station operator reliability

    International Nuclear Information System (INIS)

    Sabri, Z.A.; Husseiny, A.A.

    1979-01-01

    The operator-plant interface is a critical component of power stations which requires the formulation of mathematical models to be applied in plant reliability analysis. The human model introduced here is based on cybernetic interactions and allows for use of available data from psychological experiments, hot and cold training and normal operation. The operator model is identified and integrated in the control and protection systems. The availability and reliability are given for different segments of the operator task and for specific periods of the operator life: namely, training, operation and vigilance or near retirement periods. The results can be easily and directly incorporated in system reliability analysis. (author)

  17. Use of PRA methodology for enhancing operational safety and reliability

    International Nuclear Information System (INIS)

    Chu, B.; Rumble, E.; Najafi, B.; Putney, B.; Young, J.

    1985-01-01

    This paper describes a broad scope, on-going R and D study, sponsored by the Electric Power Research Institute (EPRI) to utilize key features of the state-of-the-art plant information management and system analysis techniques to develop and demonstrate a practical engineering tool for assisting plant engineering and operational staff to perform their activities more effectively. The study is foreseen to consist of two major activities: to develop a user-friendly, integrated software system; and to demonstrate the applications of this software on-site. This integrated software, Reliability Analysis Program with In-Plant Data (RAPID), will consist of three types of interrelated elements: an Executive Controller which will provide engineering and operations staff users with interface and control of the other two software elements, a Data Base Manager which can acquire, store, select, and transfer data, and Applications Modules which will perform the specific reliability-oriented functions. A broad range of these functions has been envisaged. The immediate emphasis will be focused on four application modules: a Plant Status Module, a Technical Specification Optimization Module, a Reliability Assessment Module, and a Utility Module for acquiring plant data

  18. Reliability performance of standby equipment with periodic testing

    International Nuclear Information System (INIS)

    Sim, S.H.

    1985-11-01

    In this report, the reliability performance of standby equipment subjected to periodic testing is studied. analytical expressions have been derived for reliability measures, such as the man accumulated operating time to failure, the expected number of tests between two consecutive failures, the mean time to failure following an emergency start-up and the probability of failing to complete an emergency mission of a specified duration. These results are useful for the reliability assessment of standby equipment such as combustion turbine units of the emergency power supply system, and of the Class III power system at a nuclear generating station

  19. Prediction of software operational reliability using testing environment factor

    International Nuclear Information System (INIS)

    Jung, Hoan Sung

    1995-02-01

    Software reliability is especially important to customers these days. The need to quantify software reliability of safety-critical systems has been received very special attention and the reliability is rated as one of software's most important attributes. Since the software is an intellectual product of human activity and since it is logically complex, the failures are inevitable. No standard models have been established to prove the correctness and to estimate the reliability of software systems by analysis and/or testing. For many years, many researches have focused on the quantification of software reliability and there are many models developed to quantify software reliability. Most software reliability models estimate the reliability with the failure data collected during the test assuming that the test environments well represent the operation profile. User's interest is on the operational reliability rather than on the test reliability, however. The experiences show that the operational reliability is higher than the test reliability. With the assumption that the difference in reliability results from the change of environment, testing environment factor comprising the aging factor and the coverage factor are defined in this work to predict the ultimate operational reliability with the failure data. It is by incorporating test environments applied beyond the operational profile into testing environment factor Test reliability can also be estimated with this approach without any model change. The application results are close to the actual data. The approach used in this thesis is expected to be applicable to ultra high reliable software systems that are used in nuclear power plants, airplanes, and other safety-critical applications

  20. 76 FR 16240 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits

    Science.gov (United States)

    2011-03-23

    ... identified by the Commission. \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... reliability of the interconnection by ensuring that the bulk electric system is assessed during the operations... responsibility for SOLs. Further, Bulk-Power System reliability practices assign responsibilities for analyzing...

  1. QA support for TFTR reliability improvement program in preparation for DT operation

    International Nuclear Information System (INIS)

    Parsells, R.F.; Howard, H.P.

    1987-01-01

    As TFTR approaches experiments in the Q=1 regime, machine reliability becomes a major variable in achieving experimental objectives. This paper describes the methods used to quantify current reliability levels, levels required for D-T operations, proposed methods for reliability growth and improvement, and tracking of reliability performance in that growth. Included in this scope are data collection techniques and short comings, bounding current reliability on the upper end, and requirements for D-T operations. Problem characterization through Pareto diagrams provides insight into recurrent failure modes and the use of Duane plots for charting of reliability changes both cumulative and instantaneous, is explained and demonstrated

  2. SGHWR fuel performance, safety and reliability

    International Nuclear Information System (INIS)

    Pickman, D.O.; Inglis, G.H.

    1977-05-01

    The design principles involved in fuel pins and elements need to take account of the sometimes conflicting requirements of safety and reliability. The principal factors involved in this optimisation are discussed and it is shown from fuel irradiation experience in the Winfrith SGHWR that the necessary bias towards safety has not resulted in a reliability level lower than that shown by other successful water reactor designs. Reliability has important economic implications. By a detailed evaluation of SGHWR fuel defects it is shown that very few defects can be shown to be related to design, rating, or burn-up. This demonstrates that economic aspects have not over-ridden necessary criteria that most be met to achieve the desirable reliability level. It is possible that large scale experience on SGHWR fuel may eventually demonstrate that the balance is too much in favour of reliability and consideration may be given to whether design changes favouring economy could be achieved without compromising safety. The safety criteria applied to SGHWR fuel are designed to avoid any possibility of a temperature runaway in any credible accident situation. the philosophy and supporting experimental work programme are outlines and the fuel design features which particularly contribute to maximising safety margins are outlined. Reference is made to the new 60-pin fuel element to be used in the commercial SGHWRs and to its comparison in design and performance aspects with the 36-pin element that has been used to date in the Winfrith SGHWR. (author)

  3. System reliability, performance and trust in adaptable automation.

    Science.gov (United States)

    Chavaillaz, Alain; Wastell, David; Sauer, Jürgen

    2016-01-01

    The present study examined the effects of reduced system reliability on operator performance and automation management in an adaptable automation environment. 39 operators were randomly assigned to one of three experimental groups: low (60%), medium (80%), and high (100%) reliability of automation support. The support system provided five incremental levels of automation which operators could freely select according to their needs. After 3 h of training on a simulated process control task (AutoCAMS) in which the automation worked infallibly, operator performance and automation management were measured during a 2.5-h testing session. Trust and workload were also assessed through questionnaires. Results showed that although reduced system reliability resulted in lower levels of trust towards automation, there were no corresponding differences in the operators' reliance on automation. While operators showed overall a noteworthy ability to cope with automation failure, there were, however, decrements in diagnostic speed and prospective memory with lower reliability. Copyright © 2015. Published by Elsevier Ltd.

  4. Developing a system engineering program to improve performance and reliability

    International Nuclear Information System (INIS)

    Keuter, D.

    1985-01-01

    After several maintenance, operational, and equipment problems last year, Trojan set out on a mission to improve plant performance and reliability by strengthening its on-site engineering organization. This paper presents Trojan's plans in developing an on-site system engineering organization

  5. Product quality, service reliability and management of operations at ...

    African Journals Online (AJOL)

    High product quality, service reliability, and management of operations are key factors in business growth and sustainability. Analyzing “The Starbucks Experience” is a pedagogical approach to reinforcing the concepts of control and management of quality, service reliability, and efficient operations in action. The objective ...

  6. Operator reliability analysis during NPP small break LOCA

    International Nuclear Information System (INIS)

    Zhang Jiong; Chen Shenglin

    1990-01-01

    To assess the human factor characteristic of a NPP main control room (MCR) design, the MCR operator reliability during a small break LOCA is analyzed, and some approaches for improving the MCR operator reliability are proposed based on the analyzing results

  7. SGHWR fuel performance, safety and reliability

    International Nuclear Information System (INIS)

    Pickman, D.O.; Inglis, G.H.

    1977-01-01

    The design principles involved in fuel pins and elements need to take account of the sometimes conflicting requirements of performance, safety and reliability. The principal factors involved in this optimisation are discussed and it is shown from fuel irradiation experience in the Winfrith S.G.H.W.R. that the necessary bias toward safety has not resulted in a reliability level lower than that shown by other successful water reactor designs. Reliability has important economic implications and has to be paid for. By a detailed evaluation of S.G.H.W.R. fuel defects it is shown that very few defects can be shown to be related to design, rating or burn-up. This demonstrates that economic aspects have not over-ridden necessary criteria that must be met to achieve the desirable reliability level. It is possible that large-scale experience with S.G.H.W.R. fuel may eventually demonstrate that the balance is too much in favour of reliability and consideration may be given to whether design changes favouring economy could be achieved without compromising safety. The safety criteria applied to S.G.H.W.R. fuel are designed to avoid any possibility of a temperature runaway in any credible accident situation. The philosophy and supporting experimental work programme are outlined and the fuel design features which particularly contribute to maximising safety margins are outlined. Reference is made to new 60 pin fuel element to be used in the commercial S.G.H.W.R.'s and how it compares in design and performance aspects with the 36 pin element that has been used to date in the Winfrith S.G.H.W.R

  8. The Effect of Operations Control on Reliability

    NARCIS (Netherlands)

    Van Oort, N.; Van Nes, R.

    2010-01-01

    Zoetermeer in The Netherlands. During peak hours the frequency on some trajectories is about 24 vehicles an hour. Dealing with these high frequencies and offering travelers a high quality product, according to waiting times as well as the probability of getting a seat, the operator designed a three

  9. Thermal performance envelopes for MHTGRs - Reliability by design

    International Nuclear Information System (INIS)

    Etzel, K.T.; Howard, W.W.; Zgliczynski, J.

    1992-01-01

    Thermal performance envelopes are used to specify steady-state design requirements for the systems of the modular high-temperature gas-cooled reactor (MHTGR) to maximize plant performance reliability with optimized design. The thermal performance envelopes are constructed around the expected operating point to account for uncertainties in actual plant as-built parameters and plant operation. The components are then designed to perform successfully at all points within the envelope. As a result, plant reliability is maximized by accounting for component thermal performance variation in the design. The design is optimized by providing a means to determine required margins in a disciplined and visible fashion. This is accomplished by coordinating these requirements with the various system and component designers in the early stages of the design, applying the principles of total quality management. The design is challenged by the more complex requirements associated with a range of operating conditions, but in return, high probability of delivering reliable performance throughout the plant life is ensured

  10. Ergonomics design and operator training as contributors to human reliability

    International Nuclear Information System (INIS)

    Jackson, A.R.G.; Madden, V.J.; Umbers, I.G.; Williams, J.C.

    1987-01-01

    The safe operation of nuclear reactors depends not only on good physical safety engineering but on the human operators as well. The Central Electricity Generating Board's approach to human reliability includes the following aspects: ergonomics design (task analysis and the development of man-machine interfaces), analysis of human reliability, operational feedback, staff training and assessment, maintenance management, research programmes and management. This paper describes how these combine to achieve the highest practicable level of human reliability, not only for the Sizewell-B pressurized water reactor, but also for the Board's gas-cooled reactors. Examples are used to illustrate the topics considered. (UK)

  11. Status of an operating reliability program

    International Nuclear Information System (INIS)

    Johnson, R.A.

    1985-01-01

    This paper deals with productivity improvement programs (PIP) for nuclear generating plants. The PIP was implemented in 1979 as a joint effort between Commonwealth Edison's (CECo's) operating nuclear stations and the Station Nuclear Engineering Department. Goals were set to reduce nonproductivity by 10% over a 5 year period. This goal was accomplished December 31, 1983. Topics of discussion are program method, problem analysis and resolution, program results, program improvements, and proposed additions to the PIP. The program is providing CECo with greater electrical generating productivity

  12. Reliable file sharing in distributed operating system using web RTC

    Science.gov (United States)

    Dukiya, Rajesh

    2017-12-01

    Since, the evolution of distributed operating system, distributed file system is come out to be important part in operating system. P2P is a reliable way in Distributed Operating System for file sharing. It was introduced in 1999, later it became a high research interest topic. Peer to Peer network is a type of network, where peers share network workload and other load related tasks. A P2P network can be a period of time connection, where a bunch of computers connected by a USB (Universal Serial Bus) port to transfer or enable disk sharing i.e. file sharing. Currently P2P requires special network that should be designed in P2P way. Nowadays, there is a big influence of browsers in our life. In this project we are going to study of file sharing mechanism in distributed operating system in web browsers, where we will try to find performance bottlenecks which our research will going to be an improvement in file sharing by performance and scalability in distributed file systems. Additionally, we will discuss the scope of Web Torrent file sharing and free-riding in peer to peer networks.

  13. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  14. Performance and reliability of LWR fuel

    International Nuclear Information System (INIS)

    Bairiot, H.; Deramaix, P.; Vandenberg, C.

    1977-01-01

    The main requirements for fuel reloads are: good reliability, minimum fuel cycle costs and flexibility of operation. Fulfilling these goals requires a background of experience. The approach to the acquisition of this experience in the particular case of BN has included over the last 15 years a proper development and cross-checking of the design methods and criteria, a continuous updating of the drawings and specifications and the qualification of adequate fabrication plants. This approach can best be outlined on the basis of the gradual implementation of the modern features of the LWR fuel. The first fuel clad with stainless steel was loaded in the BR 3 (11 MWe) in 1969 and later on (since 1974) in the SENA plant (310 MWe). Similarly, Zircaloy 4 cladding was first introduced in a reactor reload in 1969 as autoclaved cladding and later on (in 1971) the autoclaving was suppressed for the further reloads. Zircaloy 2 was loaded in DODEWAARD (51.5 MWe) in 1970. The first demonstration assembly in a PWR was a Pu-island assembly loaded in the BR 3 in 1963. It was followed by an all-Pu assembly in the same reactor in 1965 and by the loading of Pu fuels in four prototype assemblies in GARIGLIANO (160 MWe) in 1968. A full reload incorporating Pu fuel has been experienced by the supply of fuel for GARIGLIANO (BOL: 1975) and for BR 3 (BOL: 1972 and 1976). While in the early sixties the brazed design was still being utilized, the first assembly incorporating grids with springs was introduced in BR 3 in 1963. The first Inconel grids were loaded in the same reactor in 1969 and the first Zircaloy grids in 1972 (the first Zr grid has been loaded in a BWR in 1973). The experience covered successively the shrouded design (BOL: 1963), the shroudless design (BOL: 1969), a BWR assembly (BOL: 1971), a typical RCC assembly first with large diameter fuel rods (1972) and later on with small diameter fuel rods (1974). The experience on the reactivity control covered successively diluted

  15. Operational reliability testing of FBR fuel in EBR-II

    International Nuclear Information System (INIS)

    Asaga, Takeo; Ukai, Shigeharu; Nomura, Shigeo; Shikakura, Sakae

    1991-01-01

    The operational reliability testing of FBR fuel has been conducting in EBR-II as a DOE/PNC collaboration program. This paper reviews the achieved summary of Phase-I test as well as outline of progressing Phase-II test. In Phase-I test, the reliability of FBR fuel pins including 'MONJU' fuel was demonstrated at the event of operational transient. Continued operation of the failed pins was also shown to be feasible without affecting the plant operation. The objectives of the Phase-II test is to extend the data base relating with the operational reliability for long life fuel, and to supply the highly quantitative evaluation. The valuable insight obtained in Phase-II test are considerably expected to be useful toward the achievement of commercial FBR. (author)

  16. The evaluation of operator reliability factors on power reactor

    International Nuclear Information System (INIS)

    Karlina, Itjeu; Supriatna, Piping; W, Suharyo; Santosa, Kussigit; Darlis; S, Bambang; Y, Sasongko

    1999-01-01

    The sophisticated technology system was not assured the reliability system itself because it has contained a part of human dependence affected successfully of reactor operation either how work smoothly and safe or failure ac cured and then accident appears promptly. The evaluation of operator reliability factor on ABWR power reactor has been carried out which consist of criterion skill and workload according to NUREG/CR-2254, NUREG/CR-4016 and NUREG-0835 the reactor operation reliability emphasize to the operator are synergic between skill and workload themselves. The employee's skill will affect to the type and level of their tasks. The operator's skill depend on education and experiences, position or responsibility of tasks, physical conditions (age uninvalid of physic/mental

  17. Operational reliability of the Point Lepreau GS standby generators

    Energy Technology Data Exchange (ETDEWEB)

    Loughead, D. A.; McGregor, A. T. [Safety and Compllance Group, New Brunswick Electric Power Commission, Point Lepreau Generating Station, P.O.Box 10 Lepreau, New Brunswick E0G 2H0 (Canada)

    1986-02-15

    Performance of the two Point Lepreau GS standby generators during the first three years of licensed station operation is reviewed. It is shown that the mandated reliability/availability requirements have been met. The nature of starting and running failures has been examined and the consequences, in terms of design and procedural changes, discussed. A brief review of standby generator outages is included to permit estimates of standby generator availability and total Class III standby power unavailability. A pair of simple equations is introduced as a means of estimating the probable economic penalty, both cumulative and incremental, associated with the running failure of one standby generator while the other is on a maintenance outage. (authors)

  18. Operational reliability of the Point Lepreau GS standby generators

    International Nuclear Information System (INIS)

    Loughead, D.A.; McGregor, A.T.

    1986-01-01

    Performance of the two Point Lepreau GS standby generators during the first three years of licensed station operation is reviewed. It is shown that the mandated reliability/availability requirements have been met. The nature of starting and running failures has been examined and the consequences, in terms of design and procedural changes, discussed. A brief review of standby generator outages is included to permit estimates of standby generator availability and total Class III standby power unavailability. A pair of simple equations is introduced as a means of estimating the probable economic penalty, both cumulative and incremental, associated with the running failure of one standby generator while the other is on a maintenance outage. (authors)

  19. Optimizing the design and operation of reactor emergency systems using reliability analysis techniques

    International Nuclear Information System (INIS)

    Snaith, E.R.

    1975-01-01

    Following a reactor trip various reactor emergency systems, e.g. essential power supplies, emergency core cooling and boiler feed water arrangements are required to operate with a high degree of reliability. These systems must therefore be critically assessed to confirm their capability of operation and determine their reliability of performance. The use of probability analysis techniques enables the potential operating reliability of the systems to be calculated and this can then be compared with the overall reliability requirements. However, a system reliability analysis does much more than calculate an overall reliability value for the system. It establishes the reliability of all parts of the system and thus identifies the most sensitive areas of unreliability. This indicates the areas where any required improvements should be made and enables the overall systems' designs and modes of operation to be optimized, to meet the system and hence the overall reactor safety criteria. This paper gives specific examples of sensitive areas of unreliability that were identified as a result of a reliability analysis that was carried out on a reactor emergency core cooling system. Details are given of modifications to design and operation that were implemented with a resulting improvement in reliability of various reactor sub-systems. The report concludes that an initial calculation of system reliability should represent only the beginning of continuing process of system assessment. Data on equipment and system performance, particularly in those areas shown to be sensitive in their effect on the overall nuclear power plant reliability, should be collected and processed to give reliability data. These data should then be applied in further probabilistic analyses and the results correlated with the original analysis. This will demonstrate whether the required and the originally predicted system reliability is likely to be achieved, in the light of the actual history to date of

  20. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  1. Influence of organizational factors on performance reliability

    International Nuclear Information System (INIS)

    Haber, S.B.; O'Brien, J.N.; Metlay, D.S.; Crouch, D.A.

    1991-12-01

    This is the first volume of a two-volume report. Volume 2 will be published at a later date. This report presents the results of a research project conducted by Brookhaven National Laboratory for the United States Nuclear Regulatory Commission, Office of Nuclear Regulatory Research. The purpose of the project was to develop a general methodology to be use in the assessment of the organizational factors which affect performance reliability (safety) in a nuclear power plant. The research described in this report includes the development of the Nuclear Organization and Management Analysis Concept (GNOMIC). This concept characterizes the organizational factors that impact safety performance in a nuclear power plant and identifies some methods for systematically measuring and analyzing the influence of these factors on safety performance. This report is divided into two parts; Part 1 presents an overview of the development of the methodology, while Part 2 provides more details and a technical analysis of the methodological development. Specifically, the results of two demonstration studies, the feasibility of the methodology, and a specific applications for which the methodology was developed are presented

  2. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1981-01-01

    This lecture presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis, outlines the main reasons for the reliable performance of Swiss nuclear power plants and explains the management function as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability. (orig./RW)

  3. The SACADA database for human reliability and human performance

    International Nuclear Information System (INIS)

    James Chang, Y.; Bley, Dennis; Criscione, Lawrence; Kirwan, Barry; Mosleh, Ali; Madary, Todd; Nowell, Rodney; Richards, Robert; Roth, Emilie M.; Sieben, Scott; Zoulis, Antonios

    2014-01-01

    Lack of appropriate and sufficient human performance data has been identified as a key factor affecting human reliability analysis (HRA) quality especially in the estimation of human error probability (HEP). The Scenario Authoring, Characterization, and Debriefing Application (SACADA) database was developed by the U.S. Nuclear Regulatory Commission (NRC) to address this data need. An agreement between NRC and the South Texas Project Nuclear Operating Company (STPNOC) was established to support the SACADA development with aims to make the SACADA tool suitable for implementation in the nuclear power plants' operator training program to collect operator performance information. The collected data would support the STPNOC's operator training program and be shared with the NRC for improving HRA quality. This paper discusses the SACADA data taxonomy, the theoretical foundation, the prospective data to be generated from the SACADA raw data to inform human reliability and human performance, and the considerations on the use of simulator data for HRA. Each SACADA data point consists of two information segments: context and performance results. Context is a characterization of the performance challenges to task success. The performance results are the results of performing the task. The data taxonomy uses a macrocognitive functions model for the framework. At a high level, information is classified according to the macrocognitive functions of detecting the plant abnormality, understanding the abnormality, deciding the response plan, executing the response plan, and team related aspects (i.e., communication, teamwork, and supervision). The data are expected to be useful for analyzing the relations between context, error modes and error causes in human performance

  4. Assessing the reliability of skilled performance

    International Nuclear Information System (INIS)

    Dougherty, E.M.; Collins, E.P.

    1996-01-01

    In some high-hazard military tasks, precision of motor skills is crucial to avoid a risk-sensitive drop or other mishap. Sparse data supports a basic level of reliability for this activity seemingly much lower than typical, individual action, slip-mode errors would yield. A typical occurrence failure rate seems to be of the order of 1 x 10 -5 per opportunity. A speculation is tendered that this represents a difference in kind; that the reliability of skills is a different taxon than previously called out in the typical scheme of human reliability

  5. On the plant operators performance during earthquake

    International Nuclear Information System (INIS)

    Kitada, Y.; Yoshimura, S.; Abe, M.; Niwa, H.; Yoneda, T.; Matsunaga, M.; Suzuki, T.

    1994-01-01

    There is little data on which to judge the performance of plant operators during and after strong earthquakes. In order to obtain such data to enhance the reliability on the plant operation, a Japanese utility and a power plant manufacturer carried out a vibration test using a shaking table. The purpose of the test was to investigate operator performance, i.e., the quickness and correctness in switch handling and panel meter read-out. The movement of chairs during earthquake as also of interest, because if the chairs moved significantly or turned over during a strong earthquake, some arresting mechanism would be required for the chair. Although there were differences between the simulated earthquake motions used and actual earthquakes mainly due to the specifications of the shaking table, the earthquake motions had almost no influence on the operators of their capability (performance) for operating the simulated console and the personal computers

  6. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...

  7. Operator reliability study for Probabilistic Safety Analysis of an operating research reactor

    International Nuclear Information System (INIS)

    Mohamed, F.; Hassan, A.; Yahaya, R.; Rahman, I.; Maskin, M.; Praktom, P.; Charlie, F.

    2015-01-01

    Highlights: • Human Reliability Analysis (HRA) for Level 1 Probabilistic Safety Analysis (PSA) is performed on research nuclear reactor. • Implemented qualitative HRA framework is addressed. • Human Failure Events of significant impact to the reactor safety are derived. - Abstract: A Level 1 Probabilistic Safety Analysis (PSA) for the TRIGA Mark II research reactor of Malaysian Nuclear Agency has been developed to evaluate the potential risk in its operation. In conjunction to this PSA development, Human Reliability Analysis (HRA) is performed in order to determine human contribution to the risk. The aim of this study is to qualitatively analyze human actions (HAs) involved in the operation of this reactor according to the qualitative part of the HRA framework for PSA which is namely the identification, qualitative screening and modeling of HAs. By performing this framework, Human Failure Events (HFEs) of significant impact to the reactor safety are systematically analyzed and incorporated into the PSA structure. A part of the findings in this study will become the input for the subsequent quantitative part of the HRA framework, i.e. the Human Error Probability (HEP) quantification

  8. SLAC modulator operation and reliability in the SLC Era

    International Nuclear Information System (INIS)

    Donaldson, A.R.; Ashton, J.R.

    1992-06-01

    A discussion of the operation and reliability of the 244 modulators in the SLAC linac with an emphasis on the past three years of operation. The linac modulators were designed and built in the 60's, upgraded for the SLAC Linear Collider (SLC) in the mid 80s, and despite their age are still reliable accelerator components. The 60s modulator operated at 65 MW peak and 83 kW average power. The upgrade resulted in 150 MW peak output at an average power of 87 kW, a modest increase since the repetition rate was dropped from 360 to 120 Hz. In the present accelerator configuration, the Linac operates as a source of electrons and positrons to a single pass coillider. The classic collider is a storage ring filled with oppositely charged, counter-rotating particles which are allowed to collide until an accelerator fault occurs and the stored beams are aborted. A reasonable storage ring can store and collide particles for as long as eight hours with a 10 or 20 minute filling time. A single pass collider, + on the other hand, can only produce e - and e + collisions at whatever rate the source operates. To be effective the SLC must operate at 120 Hz with a very high degree of reliability and on a continuous basis. Fortunately, the linac has a modest excess of modulator/klystron systems which allows some measure of redundancy and hence some freedom from the constraint that all 244 modulator/klystrons operate simultaneously. Nonetheless, high importance is placed on modulator MTBF and MTRR or, in the parlance of reliability experts and accelerator physicists, availability. This is especially true of the modulators associated with the fundamental requirements of a collider such as injection, compression and positron production

  9. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  10. High-Performance Operating Systems

    DEFF Research Database (Denmark)

    Sharp, Robin

    1999-01-01

    Notes prepared for the DTU course 49421 "High Performance Operating Systems". The notes deal with quantitative and qualitative techniques for use in the design and evaluation of operating systems in computer systems for which performance is an important parameter, such as real-time applications......, communication systems and multimedia systems....

  11. Reliability evaluation of oil pipelines operating in aggressive environment

    Science.gov (United States)

    Magomedov, R. M.; Paizulaev, M. M.; Gebel, E. S.

    2017-08-01

    In connection with modern increased requirements for ecology and safety, the development of diagnostic services complex is obligatory and necessary enabling to ensure the reliable operation of the gas transportation infrastructure. Estimation of oil pipelines technical condition should be carried out not only to establish the current values of the equipment technological parameters in operation, but also to predict the dynamics of changes in the physical and mechanical characteristics of the material, the appearance of defects, etc. to ensure reliable and safe operation. In the paper, existing Russian and foreign methods for evaluation of the oil pipelines reliability are considered, taking into account one of the main factors leading to the appearance of crevice in the pipeline material, i.e. change the shape of its cross-section, - corrosion. Without compromising the generality of the reasoning, the assumption of uniform corrosion wear for the initial rectangular cross section has been made. As a result a formula for calculation the probability of failure-free operation was formulated. The proposed mathematical model makes it possible to predict emergency situations, as well as to determine optimal operating conditions for oil pipelines.

  12. Approach to assurance of reliability of linear accelerator operation observations

    International Nuclear Information System (INIS)

    Bakov, S.M.; Borovikov, A.A.; Kavkun, S.L.

    1994-01-01

    The system approach to solving the task of assuring reliability of observations over the linear accelerator operation is proposed. The basic principles of this method consist in application of dependences between the facility parameters, decrease in the number of the system apparatus channels for data acquisition without replacement of failed channel by reserve one. The signal commutation unit, the introduction whereof into the data acquisition system essentially increases the reliability of the measurement system on the account of active reserve, is considered detail. 8 refs. 6 figs

  13. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  14. Analysis of performance reliability of electrical and electronic equipment of car-tractor

    Directory of Open Access Journals (Sweden)

    Kravchenko О.Р.

    2016-08-01

    Full Text Available The analysis of the operational reliability of electrical and electronic equipment of vehicles, trucks Mercedes-Benz Actros 1844 LS and Volvo FH 1242, conducting international cargo transportation is performed. It is established that the equipment is reliable, which meets modern requirements, but where there is a violation of the resolution. The reason for repair work is constructive and operational factors. Distribution of efficiency and overall performance of operational reliability is retrieved. Items with more bounce are found. Common factors of violation of efficiency cars, trucks in operation, are largely different stages in warranty runs are obtained.

  15. Reliability analysis of maintenance operations for railway tracks

    International Nuclear Information System (INIS)

    Rhayma, N.; Bressolette, Ph.; Breul, P.; Fogli, M.; Saussine, G.

    2013-01-01

    Railway engineering is confronted with problems due to degradation of the railway network that requires important and costly maintenance work. However, because of the lack of knowledge on the geometrical and mechanical parameters of the track, it is difficult to optimize the maintenance management. In this context, this paper presents a new methodology to analyze the behavior of railway tracks. It combines new diagnostic devices which permit to obtain an important amount of data and thus to make statistics on the geometric and mechanical parameters and a non-intrusive stochastic approach which can be coupled with any mechanical model. Numerical results show the possibilities of this methodology for reliability analysis of different maintenance operations. In the future this approach will give important informations to railway managers to optimize maintenance operations using a reliability analysis

  16. ADVANCED COMPRESSOR ENGINE CONTROLS TO ENHANCE OPERATION, RELIABILITY AND INTEGRITY

    Energy Technology Data Exchange (ETDEWEB)

    Gary D. Bourn; Jess W. Gingrich; Jack A. Smith

    2004-03-01

    This document is the final report for the ''Advanced Compressor Engine Controls to Enhance Operation, Reliability, and Integrity'' project. SwRI conducted this project for DOE in conjunction with Cooper Compression, under DOE contract number DE-FC26-03NT41859. This report addresses an investigation of engine controls for integral compressor engines and the development of control strategies that implement closed-loop NOX emissions feedback.

  17. The operating reliability of the reactor coolant pump

    International Nuclear Information System (INIS)

    Grancy, W.

    1996-01-01

    There is a strong tendency among operating companies and manufacturers of nuclear power stations to further increase safety and operating availability of the plant and of its components. This applies also and particularly to reactor coolant pumps for the primary circuit of nuclear power stations of the type PWR. For 3 decades, ANDRITZ has developed and built such pumps and has attached great importance to the design of the complete pump rotor and of its essential surrounding elements, such as bearing and shaft seal. Apart from questions connected with design functioning of the pump there is one question of top priority: the operating reliability of the reactor coolant pump. The pump rotor (together with the rotor of the drive motor) is the only component within the primary system that permanently rotates at high speed during operation of the reactor plant. Many questions concerning design and configuration of such components cannot be answered purely theoretically, or they can only be answered partly. Therefore comprehensive development work and testing was necessary to increase the operating reliability of the pump rotor itself and of its surrounding elements. This contribution describes the current status of development and, as a focal point, discusses shaft sealing solutions elaborated so far. In this connection also a sealing system will be presented which aims for the first time at using a two-stage mechanical seal in reactor coolant pumps

  18. Evaluation of reliability assurance approaches to operational nuclear safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1984-01-01

    This report discusses the results of research to evaluate existing and/or recommended safety/reliability assurance activities among nuclear and other high technology industries for potential nuclear industry implementation. Since the Three Mile Island (TMI) accident, there has been increased interest in the use of reliability programs (RP) to assure the performance of nuclear safety systems throughout the plant's lifetime. Recently, several Nuclear Regulatory Commission (NRC) task forces or safety issue review groups have recommended RPs for assuring the continuing safety of nuclear reactor plants. 18 references

  19. Composite system reliability evaluation by stochastic calculation of system operation

    Energy Technology Data Exchange (ETDEWEB)

    Haubrick, H -J; Hinz, H -J; Landeck, E [Dept. of Power Systems and Power Economics (Germany)

    1994-12-31

    This report describes a new developed probabilistic approach for steady-state composite system reliability evaluation and its exemplary application to a bulk power test system. The new computer program called PHOENIX takes into consideration transmission limitations, outages of lines and power stations and, as a central element, a highly sophisticated model to the dispatcher performing remedial actions after disturbances. The kernel of the new method is a procedure for optimal power flow calculation that has been specially adapted for the use in reliability evaluations under the above mentioned conditions. (author) 11 refs., 8 figs., 1 tab.

  20. Modeling Optimal Scheduling for Pumping System to Minimize Operation Cost and Enhance Operation Reliability

    Directory of Open Access Journals (Sweden)

    Yin Luo

    2012-01-01

    Full Text Available Traditional pump scheduling models neglect the operation reliability which directly relates with the unscheduled maintenance cost and the wear cost during the operation. Just for this, based on the assumption that the vibration directly relates with the operation reliability and the degree of wear, it could express the operation reliability as the normalization of the vibration level. The characteristic of the vibration with the operation point was studied, it could be concluded that idealized flow versus vibration plot should be a distinct bathtub shape. There is a narrow sweet spot (80 to 100 percent BEP to obtain low vibration levels in this shape, and the vibration also follows similar law with the square of the rotation speed without resonance phenomena. Then, the operation reliability could be modeled as the function of the capacity and rotation speed of the pump and add this function to the traditional model to form the new. And contrast with the tradition method, the result shown that the new model could fix the result produced by the traditional, make the pump operate in low vibration, then the operation reliability could increase and the maintenance cost could decrease.

  1. EDF/EPRI collaborative program on operator reliability experiments

    International Nuclear Information System (INIS)

    Villemeur, A.; Meslin, T.; Mosneron, F.; Worledge, D.H.; Joksimovich, V.; Spurgin, A.J.

    1988-01-01

    Electricite de France (EDF) and Electric Power Research Institute (EPRI) have been involved in human reliability studies over the last few years, in the context of improvements in human reliability assessment (HRA) methodologies, and have been following a systematic process since 1982 which consists of addressing the following five ingredients: - First, classify human interactions into a limited number of classes. - Second, introduce an acceptable framework to organize the application of HRA to PRA studies. - Third, select approach(es) to quantification. - Fourth, test promising models. - Fifth, establish an appropriate data base for tested model(s) with regard to specific applications. EPRI has just recently completed Phase I of the fourth topic. This primarily focused on testing the fundamental hypotheses behing the human cognitive reliability (HCR) correlation, using power plant simulators. EDF has been carrying out simulator studies since 1980, both for man-machine interface validation and HRA data collection. This background of experience provided a stepping stone for the EPRI project. On the other hand, before 1986, EDF had mainly been concentrating on getting qualitative insights from the tests and lacked experience in quantitative analysis and modeling, while EPRI had made advances in this latter area. Before the EPRI Operator Reliability Experiments (ORE) project was initiated, it was abundantly clear to EPRI and EDF that cooperation between the two could be useful and that both parties could gain from the cooperation

  2. Multivariate performance reliability prediction in real-time

    International Nuclear Information System (INIS)

    Lu, S.; Lu, H.; Kolarik, W.J.

    2001-01-01

    This paper presents a technique for predicting system performance reliability in real-time considering multiple failure modes. The technique includes on-line multivariate monitoring and forecasting of selected performance measures and conditional performance reliability estimates. The performance measures across time are treated as a multivariate time series. A state-space approach is used to model the multivariate time series. Recursive forecasting is performed by adopting Kalman filtering. The predicted mean vectors and covariance matrix of performance measures are used for the assessment of system survival/reliability with respect to the conditional performance reliability. The technique and modeling protocol discussed in this paper provide a means to forecast and evaluate the performance of an individual system in a dynamic environment in real-time. The paper also presents an example to demonstrate the technique

  3. Plant operator performance evaluation system

    International Nuclear Information System (INIS)

    Ujita, Hiroshi; Fukuda, Mitsuko; Kubota, Ryuji.

    1989-01-01

    A plant operator performance evaluation system to analyze plant operation records during accident training and to identify and classify operator errors has been developed for the purpose of supporting realization of a training and education system for plant operators. A knowledge engineering technique was applied to evaluation of operator behavior by both even-based and symptom-based procedures, in various situations including event transition due to multiple failures or operational errors. The system classifies the identified errors as to their single and double types based on Swain's error classification and the error levels reflecting Rasmussen's cognitive level, and it also evaluates the effect of errors on plant state and then classifies error influence, using 'knowledge for phenomena and operations', as represented by frames. It has additional functions for analysis of error statistics and knowledge acquisition support of 'knowledge for operations'. The system was applied to a training analysis for a scram event in a BWR plant, and its error analysis function was confirmed to be effective by operational experts. (author)

  4. Operating reliability of the shaft seal system of ANDRITZ RCP

    International Nuclear Information System (INIS)

    Grancy, Werner; Zehentner, Martin

    2002-01-01

    The next generation of nuclear power stations will have to fulfil new expectations in terms of safety, operating behaviour and costs. This applies also and especially to reactor coolant pumps for the primary circuit of pressurized water reactor type nuclear power plants (RCP). For 4 decades, ANDRITZ AG has developed and built RCPs and has attached great importance to the design of the complete pump rotor and of its essential surrounding elements, such as e. g. the shaft seal. Many questions concerning design and configuration of the shaft seal system cannot be answered purely theoretically, or they can only be answered partly. Therefore, comprehensive development work and testing was necessary to increase the operating reliability of the seal. Apart from all relevant questions connected with design and functioning of the pump there is one question of top priority: the operating reliability of the shaft seal system. Therefore it is intended to describe the current status of design and development of ANDRITZ RCP for future Korean NPPs, to present the most important design features and to give an introduction concerning experiences for a 3-stage-hydrodynamic seal as well as for a 2-stage-hydrodynamic seal

  5. Cognitive Performance in Operational Environments

    Science.gov (United States)

    Russo, Michael; McGhee, James; Friedler, Edna; Thomas, Maria

    2005-01-01

    Optimal cognition during complex and sustained operations is a critical component for success in current and future military operations. "Cognitive Performance, Judgment, and Decision-making" (CPJD) is a newly organized U.S. Army Medical Research and Materiel Command research program focused on sustaining operational effectiveness of Future Force Warriors by developing paradigms through which militarily-relevant, higher-order cognitive performance, judgment, and decision-making can be assessed and sustained in individuals, small teams, and leaders of network-centric fighting units. CPJD evaluates the impact of stressors intrinsic to military operational environments (e.g., sleep deprivation, workload, fatigue, temperature extremes, altitude, environmental/physiological disruption) on military performance, evaluates noninvasive automated methods for monitoring and predicting cognitive performance, and investigates pharmaceutical strategies (e.g., stimulant countermeasures, hypnotics) to mitigate performance decrements. This manuscript describes the CPJD program, discusses the metrics utilized to relate militarily applied research findings to academic research, and discusses how the simulated combat capabilities of a synthetic battle laboratory may facilitate future cognitive performance research.

  6. Performing a local barrier operation

    Science.gov (United States)

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value of the counter, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  7. Development of a Reliability Program approach to assuring operational nuclear safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1985-01-01

    A Reliability Program (RP) model based on proven reliability techniques used in other high technology industries is being formulated for potential application in the nuclear power industry. Research findings are discussed. The reliability methods employed under NASA and military direction, commercial airline and related FAA programs were surveyed with several reliability concepts (e.g., quantitative reliability goals, reliability centered maintenance) appearing to be directly transferable. Other tasks in the RP development effort involved the benchmarking and evaluation of the existing nuclear regulations and practices relevant to safety/reliability integration. A review of current risk-dominant issues was also conducted using results from existing probabilistic risk assessment studies. The ongoing RP development tasks have concentrated on defining a RP for the operating phase of a nuclear plant's lifecycle. The RP approach incorporates safety systems risk/reliability analysis and performance monitoring activities with dedicated tasks that integrate these activities with operating, surveillance, and maintenance of the plant. The detection, root-cause evaluation and before-the-fact correction of incipient or actual systems failures as a mechanism for maintaining plant safety is a major objective of the RP

  8. Performance reliability prediction for thermal aging based on kalman filtering

    International Nuclear Information System (INIS)

    Ren Shuhong; Wen Zhenhua; Xue Fei; Zhao Wensheng

    2015-01-01

    The performance reliability of the nuclear power plant main pipeline that failed due to thermal aging was studied by the performance degradation theory. Firstly, through the data obtained from the accelerated thermal aging experiments, the degradation process of the impact strength and fracture toughness of austenitic stainless steel material of the main pipeline was analyzed. The time-varying performance degradation model based on the state space method was built, and the performance trends were predicted by using Kalman filtering. Then, the multi-parameter and real-time performance reliability prediction model for the main pipeline thermal aging was developed by considering the correlation between the impact properties and fracture toughness, and by using the stochastic process theory. Thus, the thermal aging performance reliability and reliability life of the main pipeline with multi-parameter were obtained, which provides the scientific basis for the optimization management of the aging maintenance decision making for nuclear power plant main pipelines. (authors)

  9. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    Science.gov (United States)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  10. Applications of Human Performance Reliability Evaluation Concepts and Demonstration Guidelines

    Science.gov (United States)

    1977-03-15

    ship stops dead in the water and the AN/SQS-26 operator recommends a new heading (000°). At T + 14 minutes, the target ship begins a hard turn to...Various Simulated Conditions 82 9 Hunan Reliability for Each Simulated Operator (Baseline Run) 83 10 Human and Equipment Availabilit / under

  11. 76 FR 23171 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2011-04-26

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g...-Power System reliability may request an interpretation of a Reliability Standard.\\7\\ The ERO's standards... information in its reliability assessments. The Reliability Coordinator must monitor Bulk Electric System...

  12. MYRRHA cryogenic system study on performances and reliability requirements

    International Nuclear Information System (INIS)

    Junquera, T.; Chevalier, N.R.; Thermeau, J.P.; Medeiros Romao, L.; Vandeplassche, D.

    2015-01-01

    A precise evaluation of the cryogenic requirements for accelerator-driven system such as the MYRRHA project has been performed. In particular, operation temperature, thermal losses, and required cryogenic power have been evaluated. A preliminary architecture of the cryogenic system including all its major components, as well as the principles for the cryogenic fluids distribution has been proposed. A detailed study on the reliability aspects has also been initiated. This study is based on the reliability of large cryogenic systems used for accelerators like HERA, LHC or SNS Linac. The requirements to guarantee good cryogenic system availability can be summarised as follows: 1) Mean Time Between Maintenance (MTBM) should be > 8 000 hours; 2) Valves, heat exchangers and turbines are particularly sensitive elements to impurities (dust, oil, gases), improvements are necessary to keep a minimal level in these components; 3) Redundancy studies for all elements containing moving/vibrating parts (turbines, compressors, including their respective bearings and seal shafts) are necessary; 4) Periodic maintenance is mandatory: oil checks, control of screw compressors every 10.000-15.000 hours, vibration surveillance programme, etc; 5) Special control and maintenance of utilities equipment (supply of cooling water, compressed air and electrical supply) is necessary; 6) Periodic vacuum checks to identify leakage appearance such as insulation vacuum of transfer lines and distribution boxes are necessary; 7) Easily exchangeable cold compressors are required

  13. Operational safety performance of Slovak NPPs in 2005

    International Nuclear Information System (INIS)

    Tomek, J.

    2006-01-01

    In this presentation author presents operational safety performance of Slovak NPPs in 2005. Operation of Slovak NPPs in 2005 was safe and reliable, with: - high level of performance low risk; - minimal impact on the personnel, environment and public; - positive attitude to safety.

  14. Inducement of Design Parameters for Reliability Improvement of Servo Actuator for Hydraulic Valve Operation

    Energy Technology Data Exchange (ETDEWEB)

    Sung, Baek Ju; Kim, Do Sik [Korea Institute of Machinery and Materials, Daejeon (Korea, Republic of)

    2014-05-15

    The precision hydraulic valve is widely used in various industrial field like aircraft, automobile, and general machinery. Servo actuator is the most important device for driving the precise hydraulic valve. The reliable operation of servo actuator effects on the overall hydraulic system. The performance of servo actuator relies on frequency response and step response according to arbitrary input signal. In this paper, we performed the analysis for the components of servo actuator to satisfy the reliable operation and response characteristics through the reliability analysis, and also induced the design parameters to realize the reliable operation and fast response characteristics of servo actuator for hydraulic valve operation through the empirical knowledge of experts and electromagnetic theories. We suggested the design equations to determine the values of design parameters of servo actuator as like bobbin size, length of yoke and plunger and turn number of coil, and verified the achieved design values through FEM analysis and performance tests using some prototypes of servo actuators adapted in hydraulic valve.

  15. RHIC heavy ion operations performance

    CERN Document Server

    Satogata, T; Ferrone, R; Pilat, F

    2006-01-01

    The Relativistic Heavy Ion Collider (RHIC) completed its fifth year of operation in 2005, colliding copper ion beams with ps=200 GeV/u and 62.4 GeV/u[1]. Previous heavy ion runs have collided gold ions at ps=130 GeV/u, 200 GeV/u, and 62.4 GeV/u[2], and deuterons and gold ions at ps=200 GeV/u[3]. This paper discusses operational performance statistics of this facility, including Cu- Cu delivered luminosity, availability, calendar time spent in physics stores, and time between physics stores. We summarize the major factors affecting operations efficiency, and characterize machine activities between physics stores.

  16. Reliable predictions of waste performance in a geologic repository

    International Nuclear Information System (INIS)

    Pigford, T.H.; Chambre, P.L.

    1985-08-01

    Establishing reliable estimates of long-term performance of a waste repository requires emphasis upon valid theories to predict performance. Predicting rates that radionuclides are released from waste packages cannot rest upon empirical extrapolations of laboratory leach data. Reliable predictions can be based on simple bounding theoretical models, such as solubility-limited bulk-flow, if the assumed parameters are reliably known or defensibly conservative. Wherever possible, performance analysis should proceed beyond simple bounding calculations to obtain more realistic - and usually more favorable - estimates of expected performance. Desire for greater realism must be balanced against increasing uncertainties in prediction and loss of reliability. Theoretical predictions of release rate based on mass-transfer analysis are bounding and the theory can be verified. Postulated repository analogues to simulate laboratory leach experiments introduce arbitrary and fictitious repository parameters and are shown not to agree with well-established theory. 34 refs., 3 figs., 2 tabs

  17. Reliability analysis of operator's monitoring behavior in digital main control room of nuclear power plants and its application

    International Nuclear Information System (INIS)

    Zhang Li; Hu Hong; Li Pengcheng; Jiang Jianjun; Yi Cannan; Chen Qingqing

    2015-01-01

    In order to build a quantitative model to analyze operators' monitoring behavior reliability of digital main control room of nuclear power plants, based on the analysis of the design characteristics of digital main control room of a nuclear power plant and operator's monitoring behavior, and combining with operators' monitoring behavior process, monitoring behavior reliability was divided into three parts including information transfer reliability among screens, inside-screen information sampling reliability and information detection reliability. Quantitative calculation model of information transfer reliability among screens was established based on Senders's monitoring theory; the inside screen information sampling reliability model was established based on the allocation theory of attention resources; and considering the performance shaping factor causality, a fuzzy Bayesian method was presented to quantify information detection reliability and an example of application was given. The results show that the established model of monitoring behavior reliability gives an objective description for monitoring process, which can quantify the monitoring reliability and overcome the shortcomings of traditional methods. Therefore, it provides theoretical support for operator's monitoring behavior reliability analysis in digital main control room of nuclear power plants and improves the precision of human reliability analysis. (authors)

  18. ICAROUS - Integrated Configurable Algorithms for Reliable Operations Of Unmanned Systems

    Science.gov (United States)

    Consiglio, María; Muñoz, César; Hagen, George; Narkawicz, Anthony; Balachandran, Swee

    2016-01-01

    NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This paper describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and contingency control functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.

  19. Reliability evaluation of emergency AC power systems based on operating experience at U.S. nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Baranowsky, P. W. [U.S. Nuclear Regulatory Commission, Washington, DC (United States)

    1986-02-15

    The reliability of emergency AC power Systems has been under study at the U.S. Nuclear Regulatory Commission and by its contractors for several years. This paper provides the results of work recently performed to evaluate past U.S. nuclear power plant emergency AC power System reliability performance using system level data. Operating experience involving multiple diesel generator failures, unavailabilities, and simultaneous occurrences of failures and out of service diesel generators were used to evaluate reliability performance at individual nuclear power plants covering a 9 year period from 1976 through 1984. The number and nature of failures and distributions of reliability evaluation results are provided. The results show that plant specific performance varied considerably during the period with a large number achieving high reliability performance and a smaller number accounting for lower levels of reliability performance. (author)

  20. Nuclear electric propulsion operational reliability and crew safety study

    International Nuclear Information System (INIS)

    Karns, J.J.; Fragola, J.R.; Kahan, L.; Pelaccio, D.

    1993-01-01

    The central purpose of this analysis is to assess the ''achievability'' of a nuclear electric propulsion (NEP) system in a given mission. ''Achievability'' is a concept introduced to indicate the extent to which a system that meets or achieves its design goals might be implemented using the existing technology base. In the context of this analysis, the objective is to assess the achievability of an NEP system for a manned Mars mission as it pertains to operational reliability and crew safety goals. By varying design parameters, then examining the resulting system achievability, the design and mission risk drivers can be identified. Additionally, conceptual changes in design approach or mission strategy which are likely to improve overall achievability of the NEP system can be examined

  1. Atomistic mechanisms of ReRAM cell operation and reliability

    Science.gov (United States)

    Pandey, Sumeet C.

    2018-01-01

    We present results from first-principles-based modeling that captures functionally important physical phenomena critical to cell materials selection, operation, and reliability for resistance-switching memory technologies. An atomic-scale description of retention, the low- and high-resistance states (RS), and the sources of intrinsic cell-level variability in ReRAM is discussed. Through the results obtained from density functional theory, non-equilibrium Green’s function, molecular dynamics, and kinetic Monte Carlo simulations; the role of variable-charge vacancy defects and metal impurities in determining the RS, the LRS-stability, and electron-conduction in such RS is reported. Although, the statistical electrical characteristics of the oxygen-vacancy (Ox-ReRAM) and conductive-bridging RAM (M-ReRAM) are notably different, the underlying similar electrochemical phenomena describing retention and formation/dissolution of RS are being discussed.

  2. Nuclear Power Plant Operator Reliability Research Based on Fuzzy Math

    Directory of Open Access Journals (Sweden)

    Fang Xiang

    2011-01-01

    Full Text Available This paper makes use of the concept and theory of fuzzy number in fuzzy mathematics, to research for the response time of operator in accident of Chinese nuclear power plant. Through the quantitative analysis for the performance shape factors (PSFs which influence the response time of operators, the formula of the operator response time is obtained based on the possibilistic fuzzy linear regression model which is used for the first time in this kind of research. The research result shows that the correct research method can be achieved through the analysis of the information from a small sample. This method breaks through the traditional research method and can be used not only for the reference to the safe operation of nuclear power plant, but also in other areas.

  3. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  4. Establishing reliability of performance indicator of sepak takraw ...

    African Journals Online (AJOL)

    The aim of this study is to establish the necessary reliability in the notational analysis of sepak takraw. Two performance analysts were recruited to help in the collection of the data. The performances were analyzed based on the main performance indicators relevant to the demand of the game. Cronbach's alpha and ...

  5. Human Reliability Assessment and Human Performance Evaluation: Research and Analysis Activities at the U.S. NRC

    International Nuclear Information System (INIS)

    Ramey-Smith, A.M.

    1998-01-01

    The author indicates the themes of the six programs identified by the US NRC mission on human performance and human reliability activities. They aim at developing the technical basis to support human performance, at developing and updating a model of human performance and human reliability, at fostering national and international dialogue and cooperation efforts on human performance evaluation, at conducting operating events analysis and database development, and at providing support to human performance and human reliability inspection

  6. Performance and reliability of TPE-2 device with pulsed high power source

    International Nuclear Information System (INIS)

    Sato, Y.; Takeda, S.; Kiyama, S.

    1987-01-01

    The performance and the reliability of TPE-2 device with pulsed high power sources are described. To obtain the stable high beta plasma, the reproducibility and the reliability of the pulsed power sources must be maintained. A new power crowbar system with high efficiency and the switches with low jitter time are adopted to the bank system. A monitor system which always watches the operational states of the switches is developed too, and applied for the fast rising capacitor banks of TPE-2 device. The reliable operation for the bank has been realized, based on the data of switch monitor system

  7. The reliability of structural systems operating at high temperature: Replacing engineering judgement with operational experience

    International Nuclear Information System (INIS)

    Chevalier, M.J.; Smith, D.J.; Dean, D.W.

    2012-01-01

    Deterministic assessments are used to assess the integrity of structural systems operating at high temperature by providing a lower bound lifetime prediction, requiring considerable engineering judgement. However such a result may not satisfy the structural integrity assessment purpose if the results are overly conservative or conversely plant observations (such as failures) could undermine the assessment result if observed before the lower bound lifetime. This paper develops a reliability methodology for high temperature assessments and illustrates the impact and importance of managing the uncertainties within such an analysis. This is done by separating uncertainties into three classifications; aleatory uncertainty, quantifiable epistemic uncertainty and unquantifiable epistemic uncertainty. The result is a reliability model that can predict the behaviour of a structural system based upon plant observations, including failure and survival data. This can be used to reduce the over reliance upon engineering judgement which is prevalent in deterministic assessments. Highlights: ► Deterministic assessments are shown to be heavily reliant upon engineering judgment. ► Based upon the R5 procedure, a reliability model for a structural system is developed. ► Variables must be classified as either aleatory or epistemic to model their impact on reliability. ► Operation experience is then used to reduce reliance upon engineering judgment. ► This results in a model which can predict system behaviour and learn from operational experience.

  8. 18 CFR 292.308 - Standards for operating reliability.

    Science.gov (United States)

    2010-04-01

    ... reliability. 292.308 Section 292.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying... may establish reasonable standards to ensure system safety and reliability of interconnected...

  9. The development of a reliable amateur boxing performance analysis template.

    Science.gov (United States)

    Thomson, Edward; Lamb, Kevin; Nicholas, Ceri

    2013-01-01

    The aim of this study was to devise a valid performance analysis system for the assessment of the movement characteristics associated with competitive amateur boxing and assess its reliability using analysts of varying experience of the sport and performance analysis. Key performance indicators to characterise the demands of an amateur contest (offensive, defensive and feinting) were developed and notated using a computerised notational analysis system. Data were subjected to intra- and inter-observer reliability assessment using median sign tests and calculating the proportion of agreement within predetermined limits of error. For all performance indicators, intra-observer reliability revealed non-significant differences between observations (P > 0.05) and high agreement was established (80-100%) regardless of whether exact or the reference value of ±1 was applied. Inter-observer reliability was less impressive for both analysts (amateur boxer and experienced analyst), with the proportion of agreement ranging from 33-100%. Nonetheless, there was no systematic bias between observations for any indicator (P > 0.05), and the proportion of agreement within the reference range (±1) was 100%. A reliable performance analysis template has been developed for the assessment of amateur boxing performance and is available for use by researchers, coaches and athletes to classify and quantify the movement characteristics of amateur boxing.

  10. Investigation of the impact of main control room digitalization on operators cognitive reliability in nuclear power plants.

    Science.gov (United States)

    Zhou, Yong; Mu, Haiying; Jiang, Jianjun; Zhang, Li

    2012-01-01

    Currently, there is a trend in nuclear power plants (NPPs) toward introducing digital and computer technologies into main control rooms (MCRs). Safe generation of electric power in NPPs requires reliable performance of cognitive tasks such as fault detection, diagnosis, and response planning. The digitalization of MCRs has dramatically changed the whole operating environment, and the ways operators interact with the plant systems. If the design and implementation of the digital technology is incompatible with operators' cognitive characteristics, it may have negative effects on operators' cognitive reliability. Firstly, on the basis of three essential prerequisites for successful cognitive tasks, a causal model is constructed to reveal the typical human performance issues arising from digitalization. The cognitive mechanisms which they impact cognitive reliability are analyzed in detail. Then, Bayesian inference is used to quantify and prioritize the influences of these factors. It suggests that interface management and unbalanced workload distribution have more significant impacts on operators' cognitive reliability.

  11. Flash memories economic principles of performance, cost and reliability optimization

    CERN Document Server

    Richter, Detlev

    2014-01-01

    The subject of this book is to introduce a model-based quantitative performance indicator methodology applicable for performance, cost and reliability optimization of non-volatile memories. The complex example of flash memories is used to introduce and apply the methodology. It has been developed by the author based on an industrial 2-bit to 4-bit per cell flash development project. For the first time, design and cost aspects of 3D integration of flash memory are treated in this book. Cell, array, performance and reliability effects of flash memories are introduced and analyzed. Key performance parameters are derived to handle the flash complexity. A performance and array memory model is developed and a set of performance indicators characterizing architecture, cost and durability is defined.   Flash memories are selected to apply the Performance Indicator Methodology to quantify design and technology innovation. A graphical representation based on trend lines is introduced to support a requirement based pr...

  12. Performance and Reliability of Wind Turbines: A Review

    Directory of Open Access Journals (Sweden)

    Sebastian Pfaffel

    2017-11-01

    Full Text Available Performance (availability and yield and reliability of wind turbines can make the difference between success and failure of wind farm projects and these factors are vital to decrease the cost of energy. During the last years, several initiatives started to gather data on the performance and reliability of wind turbines on- and offshore and published findings in different journals and conferences. Even though the scopes of the different initiatives are similar, every initiative follows a different approach and results are therefore difficult to compare. The present paper faces this issue, collects results of different initiatives and harmonizes the results. A short description and assessment of every considered data source is provided. To enable this comparison, the existing reliability characteristics are mapped to a system structure according to the Reference Designation System for Power Plants (RDS-PP®. The review shows a wide variation in the performance and reliability metrics of the individual initiatives. Especially the comparison on onshore wind turbines reveals significant differences between the results. Only a few publications are available on offshore wind turbines and the results show an increasing performance and reliability of offshore wind turbines since the first offshore wind farms were erected and monitored.

  13. Material and design considerations of FBGA reliability performance

    International Nuclear Information System (INIS)

    Lee, Teck Kheng; Ng, T.C.; Chai, Y.M.

    2004-01-01

    FBGA package reliability is usually assessed through the conventional approaches of die attach and mold compound material optimization. However, with the rapid changes and fast-moving pace of electronic packaging and the introduction of new soldermask and core materials, substrate design has also become a critical factor in determining overall package reliability. The purpose of this paper is to understand the impact design and soldermask material of a rigid substrate on overall package reliability. Three different soldermask patterns with a matrix of different die attach, mold compound, and soldermask materials are assessed using the moisture sensitivity test (MST). Package reliability is also assessed through the use of temperature cycling (T/C) at conditions 'B' and 'C'. For material optimization, three different mold compounds and die attach materials are used. Material adhesion between different die attach materials and soldermask materials are obtained through die shear performed at various temperatures and preset moisture conditions. A study correlating the different packaging material properties and their relative adhesion strengths with overall package reliability in terms of both MST and T/C performance was performed. Soldermask design under the die pads was found to affect package reliability. For example, locating vias at the edge of the die is not desirable because the vias acts as initiation point for delamination and moisture-induced failure. Through die shear testing, soldermask B demonstrated higher adhesion properties compared to soldermask A across several packaging materials and enhanced the overall package reliability in terms of both MST and T/C performance. Both MST JEDEC level 1 and the T/C of 'B' and 'C' at 1000 cycles have been achieved through design and package material optimization

  14. Material and design considerations of FBGA reliability performance

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Teck Kheng; Ng, T.C.; Chai, Y.M

    2004-09-01

    FBGA package reliability is usually assessed through the conventional approaches of die attach and mold compound material optimization. However, with the rapid changes and fast-moving pace of electronic packaging and the introduction of new soldermask and core materials, substrate design has also become a critical factor in determining overall package reliability. The purpose of this paper is to understand the impact design and soldermask material of a rigid substrate on overall package reliability. Three different soldermask patterns with a matrix of different die attach, mold compound, and soldermask materials are assessed using the moisture sensitivity test (MST). Package reliability is also assessed through the use of temperature cycling (T/C) at conditions 'B' and 'C'. For material optimization, three different mold compounds and die attach materials are used. Material adhesion between different die attach materials and soldermask materials are obtained through die shear performed at various temperatures and preset moisture conditions. A study correlating the different packaging material properties and their relative adhesion strengths with overall package reliability in terms of both MST and T/C performance was performed. Soldermask design under the die pads was found to affect package reliability. For example, locating vias at the edge of the die is not desirable because the vias acts as initiation point for delamination and moisture-induced failure. Through die shear testing, soldermask B demonstrated higher adhesion properties compared to soldermask A across several packaging materials and enhanced the overall package reliability in terms of both MST and T/C performance. Both MST JEDEC level 1 and the T/C of 'B' and 'C' at 1000 cycles have been achieved through design and package material optimization.

  15. Operator performance in non-destructive testing: A study of operator performance in a performance test

    Energy Technology Data Exchange (ETDEWEB)

    Enkvist, J.; Edland, A.; Svenson, Ola [Stockholm Univ. (Sweden). Dept. of Psychology

    2000-05-15

    In the process industries there is a need of inspecting the integrity of critical components without disrupting the process. Such in-service inspections are typically performed with non-destructive testing (NDT). In NDT the task of the operator is to (based on diagnostic information) decide if the component can remain in service or not. The present study looks at the performance in NDT. The aim is to improve performance, in the long run, by exploring the operators' decision strategies and other underlying factors and to this way find out what makes some operators more successful than others. Sixteen operators performed manual ultrasonic inspections of four test pieces with the aim to detect (implanted) cracks. In addition to these performance demonstration tests (PDT), the operators performed independent ability tests and filled out questionnaires. The results show that operators who trust their gut feeling more than the procedure (when the two come to different results) and that at the same time have a positive attitude towards the procedure have a higher PDT performance. These results indicate the need for operators to be motivated and confident when performing NDT. It was also found that the operators who performed better rated more decision criteria higher in the detection phase than the operators who performed worse. For characterizing it was the other way around. Also, the operators who performed better used more time, both detecting and characterizing, than the operators who performed worse.

  16. Operator performance in non-destructive testing: A study of operator performance in a performance test

    International Nuclear Information System (INIS)

    Enkvist, J.; Edland, A.; Svenson, Ola

    2000-05-01

    In the process industries there is a need of inspecting the integrity of critical components without disrupting the process. Such in-service inspections are typically performed with non-destructive testing (NDT). In NDT the task of the operator is to (based on diagnostic information) decide if the component can remain in service or not. The present study looks at the performance in NDT. The aim is to improve performance, in the long run, by exploring the operators' decision strategies and other underlying factors and to this way find out what makes some operators more successful than others. Sixteen operators performed manual ultrasonic inspections of four test pieces with the aim to detect (implanted) cracks. In addition to these performance demonstration tests (PDT), the operators performed independent ability tests and filled out questionnaires. The results show that operators who trust their gut feeling more than the procedure (when the two come to different results) and that at the same time have a positive attitude towards the procedure have a higher PDT performance. These results indicate the need for operators to be motivated and confident when performing NDT. It was also found that the operators who performed better rated more decision criteria higher in the detection phase than the operators who performed worse. For characterizing it was the other way around. Also, the operators who performed better used more time, both detecting and characterizing, than the operators who performed worse

  17. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  18. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  19. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  20. 78 FR 73112 - Monitoring System Conditions-Transmission Operations Reliability Standards; Interconnection...

    Science.gov (United States)

    2013-12-05

    ...\\ \\8\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 72 FR 16416 (Apr. 4... operators and reliability coordinators to ``plan and operate the interconnected Bulk Electric System in a... mandated in the currently- effective standards, thereby improving reliability of the bulk power system...

  1. Team performance measures for abnormal plant operations

    International Nuclear Information System (INIS)

    Montgomery, J.C.; Seaver, D.A.; Holmes, C.W.; Gaddy, C.D.; Toquam, J.L.

    1990-01-01

    In order to work effectively, control room crews need to possess well-developed team skills. Extensive research supports the notion that improved quality and effectiveness are possible when a group works together, rather than as individuals. The Nuclear Regulatory Commission (NRC) has recognized the role of team performance in plant safety and has attempted to evaluate licensee performance as part of audits, inspections, and reviews. However, reliable and valid criteria for team performance have not yet been adequately developed. The purpose of the present research was to develop such reliable and valid measures of team skills. Seven dimensions of team skill performance were developed on the basis of input from NRC operator licensing examiners and from the results of previous research and experience in the area. These dimensions included two-way communications, resource management, inquiry, advocacy, conflict resolution/decision-making, stress management, and team spirit. Several different types of rating formats were developed for use with these dimensions, including a modified Behaviorally Anchored Rating Scale (BARS) format and a Behavioral Frequency format. Following pilot-testing and revision, observer and control room crew ratings of team performance were obtained using 14 control room crews responding to simulator scenarios at a BWR and a PWR reactor. It is concluded, overall, that the Behavioral Frequency ratings appeared quite promising as a measure of team skills but that additional statistical analyses and other follow-up research are needed to refine several of the team skills dimensions and to make the scales fully functional in an applied setting

  2. Developing safety performance functions incorporating reliability-based risk measures.

    Science.gov (United States)

    Ibrahim, Shewkar El-Bassiouni; Sayed, Tarek

    2011-11-01

    Current geometric design guides provide deterministic standards where the safety margin of the design output is generally unknown and there is little knowledge of the safety implications of deviating from these standards. Several studies have advocated probabilistic geometric design where reliability analysis can be used to account for the uncertainty in the design parameters and to provide a risk measure of the implication of deviation from design standards. However, there is currently no link between measures of design reliability and the quantification of safety using collision frequency. The analysis presented in this paper attempts to bridge this gap by incorporating a reliability-based quantitative risk measure such as the probability of non-compliance (P(nc)) in safety performance functions (SPFs). Establishing this link will allow admitting reliability-based design into traditional benefit-cost analysis and should lead to a wider application of the reliability technique in road design. The present application is concerned with the design of horizontal curves, where the limit state function is defined in terms of the available (supply) and stopping (demand) sight distances. A comprehensive collision and geometric design database of two-lane rural highways is used to investigate the effect of the probability of non-compliance on safety. The reliability analysis was carried out using the First Order Reliability Method (FORM). Two Negative Binomial (NB) SPFs were developed to compare models with and without the reliability-based risk measures. It was found that models incorporating the P(nc) provided a better fit to the data set than the traditional (without risk) NB SPFs for total, injury and fatality (I+F) and property damage only (PDO) collisions. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Validity and reliability of a dental operator posture assessment instrument (PAI).

    Science.gov (United States)

    Branson, Bonnie G; Williams, Karen B; Bray, Kimberly Krust; Mcllnay, Sandy L; Dickey, Diana

    2002-01-01

    Basic operating posture is considered an important occupational health issue for oral health care clinicians. It is generally agreed that the physical posture of the operator, while providing care, should be such that all muscles are in a relaxed, well-balanced, and neutral position. Postures outside of this neutral position are likely to cause musculoskeletal discomfort. To date, the range of the neutral operator position has not been well-defined; nor have any specific instruments been identified that can quantitatively or semi-quantitatively assess dental operator posture. This paper reports on the development of an instrument that can be used to semi-quantitatively evaluate postural components. During the first phase of the study, an expert panel defined the basic parameters for acceptable, compromised, and harmful operator postures and established face validity of a posture assessment instrument (PAI). During the second phase, the PAI was tested for reliability using generalizability theory. Four raters tested the instrument for reliability. Overall, total PAI scores were similar amongst three of the raters, with the fourth rater's scores being slightly greater than the other three. The main effect of the rater on individual postural components was moderate, indicating that rater variance contributed to 11.9% of total variance. The PAI measures posture as it occurs and will have numerous applications when evaluating operator performance in the dental and dental hygiene education setting. Also, the PAI will prove useful when examining the effects of operator posture and musculoskeletal disorders.

  4. Proceedings of the 1998 Photovoltaic Performance and Reliability Workshop

    International Nuclear Information System (INIS)

    Kroposki, B.

    1998-01-01

    This proceedings is the compilation of all papers presented at the 11th PV Performance and Reliability Workshop held at the Doubletree Hotel in Cocoa Beach, Florida, on November 3-5, 1998. The workshop was hosted by the Florida Solar Energy Center. This year's workshop included presentations from 29 speakers and had 110 attendees

  5. Human performance for the success of equipment reliability programs

    International Nuclear Information System (INIS)

    Woodcock, J.

    2007-01-01

    Human performance is a critical element of programs directed at equipment reliability. Reliable equipment performance requires broad support from all levels of plant management and throughout all plant departments. Experience at both nuclear power plants and fuel manufacturing plants shows that human performance must be addressed during all phases of program implementation from the beginning through the establishment of a living, on-going process. At the beginning, certain organizational and management actions during the initiation of the program set the stage for successful adoption by station personnel, leading to more rapid benefits. For the long term, equipment reliability is a living process needed throughout the lifetime of a station, a program which must be motivated and measured. Sustained acceptance and participation by the plant personnel is a requirement, and culture is a key ingredient. This paper will provide an overview of key human performance issues to be considered, using the application of the INPO AP-913 Equipment Reliability Guideline as a basis and gives some best practices for training, communicating and implementing programs. The very last part includes ways to tell if the program is effective

  6. Reliable and Valid Assessment of Clinical Bronchoscopy Performance

    DEFF Research Database (Denmark)

    Konge, Lars; Larsen, Klaus Richter; Clementsen, Paul

    2012-01-01

    : The interrater reliability was high, with Cronbach's a = 0.86. Assessment of 3 bronchoscopies by a single rater had a generalizability coefficient of 0.84. The correlation between experience and performance was good (Pearson correlation = 0.76). There were significant differences between the groups for all...

  7. Reliability and performance evaluation of stainless and mild steel ...

    African Journals Online (AJOL)

    Reliability and performance of stainless and mild steel products in methanolic and aqueous sodium chloride media have been investigated. Weight-loss and pre-exposure methods were used. There was a higher rate of weight-loss of mild steels and stainless steels in 1% HCl methanolic solution than in aqueous NaCl ...

  8. Use of a valve operation test and evaluation system to enhance valve reliability

    International Nuclear Information System (INIS)

    Lowry, D.A.

    1990-01-01

    Power plant owners have emphasized the need for assuring safe, reliable operation of valves. While most valves must simply open or close, the mechanisms involved can be quite complex. Motor operated valves (MOVs) must be properly adjusted to assure operability. Individual operator components determine the performance of the entire MOV. Failure in MOVs could cripple or shut down a unit. Thus, a complete valve program consisting of design reviews, operational testing, and preventive and predictive maintenance activities will enhance an owner's confidence level that his valves win operate as expected. Liberty's Valve Operation Test and Evaluation System (VOTES) accurately measures stein thrust without intruding on valve operation. Since mounting a strain gage to a valve stem is a desirable but impractical way of obtaining precise stem thrust, Liberty developed a method to obtain identical data by placing a strain gage sensor on the valve yoke. VOTES provides information which effectively eliminates costly, unscheduled downtime. This paper presents the results of infield VOTES testing. The system's proven ability to identify and characterize actuator and valve performance is demonstrated. Specific topics of discussion include the ability of VOTES to ease a utility's IE Bulletin 8543 concerns and conclusively diagnose MOV components. Data from static and differential pressure testing are presented. Technical, operational, and financial advantages resulting from VOTES technology are explored in detail

  9. Increase of operational reliability and durability of square sectoral working bodies of flexible screw conveyors

    Directory of Open Access Journals (Sweden)

    O.L. Lyashuk

    2017-12-01

    Full Text Available The construction of the device for guiding screw sectional working bodies of increased operational reliability and durability and the method of determination of the force of guiding the design parameters are given. Two main methods of manufacturing screw mechanisms of machines of various service purposes were investigated and it was established that twisted screws, in terms of their strength and performance, considerably exceed rolling stock. The design of the device for manufacturing screw working bodies of conveyors by means of cutting by periodic and continuous methods, as the most reliable in operation, is developed. The specifics of their work are due to various operations of technological processes, as well as physical and mechanical properties of goods, determine the nomenclature and design parameters of screw mechanisms (SM. In studying the processes of forming screw spirals, the basic precision characteristics of the methods of drilling and rolling are established. A comparative study of two main methods in terms of their operational and durable capabilities has been carried out. An important factor determining the reliability and durability of a screw is the difference in the thickness of the inner and outer edges.

  10. Nuclear computerized library for assessing reactor reliability (NUCLARR): Part 2, Guide to operations: User's guide

    International Nuclear Information System (INIS)

    Gilmore, W.E.; Gentillon, C.D.; Gertman, D.I.; Beers, G.H.; Galyean, W.J.; Gilbert, B.G.

    1988-06-01

    The Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR) is an automated data base management system for processing and storing human error probability and hardware component failure data. The NUCLARR system software resides on an IBM (or compatible) personal micro-computer. NUCLARR can be used by the end user to furnish data inputs for both human and hardware reliability analysis in support of a variety of risk assessment activities. The NUCLARR system is documented in a five-volume series of reports. Volume IV of this series is the User's Guide for operating the NUCLARR software and is presented in three parts. This volume, Part 2: Guide to Operations, contains the instructions and basic procedures for using the NUCLARR software. Part 2 provides guidance and information for getting started, performing the desired functions, and making the most efficient use of the system's features

  11. 75 FR 71613 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits

    Science.gov (United States)

    2010-11-24

    ... Interconnection to relieve overloads on the facilities modeled in the Interchange Distribution Calculator (IDC... for other SOLs. But the Functional Model assigns a much broader role to the reliability coordinator to...

  12. The human factor in operation and maintenance of complex high-reliability systems

    International Nuclear Information System (INIS)

    Ryan, T.G.

    1989-01-01

    Human factors issues in probabilistic risk assessment (PRAs) of complex high-reliability systems are addressed. These PRAs influence system operation and technical support programs such as maintainability, test, and surveillance. Using the U.S. commercial nuclear power industry as the setting, the paper addresses the manner in which PRAs currently treat human performance, the state of quantification methods and source data for analyzing human performance, and the role of human factors specialist in the analysis. The paper concludes with a presentation of TALENT, an emerging concept for fully integrating broad-based human factors expertise into the PRA process, is presented. 47 refs

  13. Improvement of the reliability graph with general gates to analyze the reliability of dynamic systems that have various operation modes

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Seung Ki [Div. of Research Reactor System Design, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); No, Young Gyu; Seong, Poong Hyun [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2016-04-15

    The safety of nuclear power plants is analyzed by a probabilistic risk assessment, and the fault tree analysis is the most widely used method for a risk assessment with the event tree analysis. One of the well-known disadvantages of the fault tree is that drawing a fault tree for a complex system is a very cumbersome task. Thus, several graphical modeling methods have been proposed for the convenient and intuitive modeling of complex systems. In this paper, the reliability graph with general gates (RGGG) method, one of the intuitive graphical modeling methods based on Bayesian networks, is improved for the reliability analyses of dynamic systems that have various operation modes with time. A reliability matrix is proposed and it is explained how to utilize the reliability matrix in the RGGG for various cases of operation mode changes. The proposed RGGG with a reliability matrix provides a convenient and intuitive modeling of various operation modes of complex systems, and can also be utilized with dynamic nodes that analyze the failure sequences of subcomponents. The combinatorial use of a reliability matrix with dynamic nodes is illustrated through an application to a shutdown cooling system in a nuclear power plant.

  14. Improvement of the reliability graph with general gates to analyze the reliability of dynamic systems that have various operation modes

    International Nuclear Information System (INIS)

    Shin, Seung Ki; No, Young Gyu; Seong, Poong Hyun

    2016-01-01

    The safety of nuclear power plants is analyzed by a probabilistic risk assessment, and the fault tree analysis is the most widely used method for a risk assessment with the event tree analysis. One of the well-known disadvantages of the fault tree is that drawing a fault tree for a complex system is a very cumbersome task. Thus, several graphical modeling methods have been proposed for the convenient and intuitive modeling of complex systems. In this paper, the reliability graph with general gates (RGGG) method, one of the intuitive graphical modeling methods based on Bayesian networks, is improved for the reliability analyses of dynamic systems that have various operation modes with time. A reliability matrix is proposed and it is explained how to utilize the reliability matrix in the RGGG for various cases of operation mode changes. The proposed RGGG with a reliability matrix provides a convenient and intuitive modeling of various operation modes of complex systems, and can also be utilized with dynamic nodes that analyze the failure sequences of subcomponents. The combinatorial use of a reliability matrix with dynamic nodes is illustrated through an application to a shutdown cooling system in a nuclear power plant

  15. Proceedings from Specialists Meeting on human performance in operational events

    International Nuclear Information System (INIS)

    1998-01-01

    This conference on human performance in operational events is composed of 34 papers, grouped in 11 sessions. After an invited contribution on the human factor in the nuclear industry, the sessions are: session 1 (Operational events: Human performance in operational events - how to improve it?, Human performance research strategies for human performance, The development of a model of control room operator cognition), session 2 (Operational response: A study of the recovery from 120 events, Empirical study of the influence of organizational and procedural characteristics on team performance in the emergency situation using plant simulators, Cognitive skills and nuclear power plant operational decision making), session 3 (PSA for Probabilistic Safety Analysis: A sensitivity study of human errors in optimizing surveillance test interval (STI) and allowed outage time (AOT) of standby safety system, Analysis of Parks nuclear power plant personnel activity during safety related event sequences, An EDF project to update the Probabilistic Human Reliability Assessment PHRA methodology), session 4 (modelling with ATHEANA: Atheana, a technique for human error analysis, an overview of its methodological basis, Common elements on operational events across technologies, Results of nuclear power plant application of new technique for human error analysis), session 5 (Regulatory practice: US.NRC Research and analysis activities concerning human reliability assessment and human performance evaluation, Introduction of simulator-based examinations and its effects on the nuclear industry, Regulatory monitoring of human performance in PWR operation in France), session 6 (Simulation: Human performance in Bavarian nuclear power plant as a preventive element, Human performance event database, Crew situation awareness, diagnoses and performance in simulated nuclear power plant process disturbances), session 7 (Operator aids: Development of a plant navigation system, Operation system

  16. Reliability and Validity of Qualitative and Operational Research Paradigm

    Directory of Open Access Journals (Sweden)

    Muhammad Bashir

    2008-01-01

    Full Text Available Both qualitative and quantitative paradigms try to find the same result; the truth. Qualitative studies are tools used in understanding and describing the world of human experience. Since we maintain our humanity throughout the research process, it is largely impossible to escape the subjective experience, even for the most experienced of researchers. Reliability and Validity are the issue that has been described in great deal by advocates of quantitative researchers. The validity and the norms of rigor that are applied to quantitative research are not entirely applicable to qualitative research. Validity in qualitative research means the extent to which the data is plausible, credible and trustworthy; and thus can be defended when challenged. Reliability and validity remain appropriate concepts for attaining rigor in qualitative research. Qualitative researchers have to salvage responsibility for reliability and validity by implementing verification strategies integral and self-correcting during the conduct of inquiry itself. This ensures the attainment of rigor using strategies inherent within each qualitative design, and moves the responsibility for incorporating and maintaining reliability and validity from external reviewers’ judgments to the investigators themselves. There have different opinions on validity with some suggesting that the concepts of validity is incompatible with qualitative research and should be abandoned while others argue efforts should be made to ensure validity so as to lend credibility to the results. This paper is an attempt to clarify the meaning and use of reliability and validity in the qualitative research paradigm.

  17. Reliability research to nuclear power plant operators based on several methods

    International Nuclear Information System (INIS)

    Fang Xiang; Li Fu; Zhao Bingquan

    2009-01-01

    The paper utilizes many kinds of international reliability research methods, and summarizes the review of reliability research of Chinese nuclear power plant operators in past over ten years based on the simulator platform of nuclear power plant. The paper shows the necessity and feasibility of the research to nuclear power plant operators from many angles including human cognition reliability, fuzzy mathematics model and psychological research model, etc. It will be good to the safe operation of nuclear power plant based on many kinds of research methods to the reliability research of nuclear power plant operators. (authors)

  18. Reliable and Fault-Tolerant Software-Defined Network Operations Scheme for Remote 3D Printing

    Science.gov (United States)

    Kim, Dongkyun; Gil, Joon-Min

    2015-03-01

    The recent wide expansion of applicable three-dimensional (3D) printing and software-defined networking (SDN) technologies has led to a great deal of attention being focused on efficient remote control of manufacturing processes. SDN is a renowned paradigm for network softwarization, which has helped facilitate remote manufacturing in association with high network performance, since SDN is designed to control network paths and traffic flows, guaranteeing improved quality of services by obtaining network requests from end-applications on demand through the separated SDN controller or control plane. However, current SDN approaches are generally focused on the controls and automation of the networks, which indicates that there is a lack of management plane development designed for a reliable and fault-tolerant SDN environment. Therefore, in addition to the inherent advantage of SDN, this paper proposes a new software-defined network operations center (SD-NOC) architecture to strengthen the reliability and fault-tolerance of SDN in terms of network operations and management in particular. The cooperation and orchestration between SDN and SD-NOC are also introduced for the SDN failover processes based on four principal SDN breakdown scenarios derived from the failures of the controller, SDN nodes, and connected links. The abovementioned SDN troubles significantly reduce the network reachability to remote devices (e.g., 3D printers, super high-definition cameras, etc.) and the reliability of relevant control processes. Our performance consideration and analysis results show that the proposed scheme can shrink operations and management overheads of SDN, which leads to the enhancement of responsiveness and reliability of SDN for remote 3D printing and control processes.

  19. Studies on the reliability of high-field intra-operative MRI in brain glioma resection

    Directory of Open Access Journals (Sweden)

    Zhi-jun SONG

    2011-07-01

    Full Text Available Objective To evaluate the reliability of high-field intra-operative magnetic resonance imaging(iMRI in detecting the residual tumors during glioma resection.Method One hundred and thirty-one cases of brain glioma(69 males and 62 females,aged from 7 to 79 years with mean of 39.6 years hospitalized from Nov.2009 to Aug.2010 were involved in present study.All the patients were evaluated using magnetic resonance imaging(MRI before the operation.The tumors were resected under conventional navigation microscope,and the high-field iMRI was used for all the patients when the operators considered the tumor was satisfactorily resected,while the residual tumor was difficult to detect under the microscope,but resected after being revealed by high-field iMRI.Histopathological examination was performed.The patients without residual tumors recieved high-field MRI scan at day 4 or 5 after operation to evaluate the accuracy of high-field iMRI during operation.Results High quality intra-operative images were obtained by using high-field iMRI.Twenty-eight cases were excluded because their residual tumors were not resected due to their location too close to functional area.Combined with the results of intra-operative histopathological examination and post-operative MRI at the early recovery stage,the sensitivity of high-field iMRI in residual tumor diagnosis was 98.0%(49/50,the specificity was 94.3%(50/53,and the accuracy was 96.1%(99/103.Conclusion High-quality intra-operative imaging could be acquired by high-field iMRI,which maybe used as a safe and reliable method in detecting the residual tumors during glioma resection.

  20. 76 FR 23470 - Version One Regional Reliability Standard for Transmission Operations

    Science.gov (United States)

    2011-04-27

    ...; Order No. 752] Version One Regional Reliability Standard for Transmission Operations AGENCY: Federal... Power Act, the Federal Energy Regulatory Commission approves regional Reliability Standard TOP-007-WECC... purpose of this regional Reliability Standard is to ensure that actual flows and associated scheduled...

  1. 75 FR 80391 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2010-12-22

    ... transmission (G&T) cooperative or similar organization to accept compliance responsibility on behalf of its... be found on the Commission's Web site; see, e.g., the ``Quick Reference Guide for Paper Submissions... Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g, Order No. 672...

  2. Reliability

    OpenAIRE

    Condon, David; Revelle, William

    2017-01-01

    Separating the signal in a test from the irrelevant noise is a challenge for all measurement. Low test reliability limits test validity, attenuates important relationships, and can lead to regression artifacts. Multiple approaches to the assessment and improvement of reliability are discussed. The advantages and disadvantages of several different approaches to reliability are considered. Practical advice on how to assess reliability using open source software is provided.

  3. Theory model and experiment research about the cognition reliability of nuclear power plant operators

    International Nuclear Information System (INIS)

    Fang Xiang; Zhao Bingquan

    2000-01-01

    In order to improve the reliability of NPP operation, the simulation research on the reliability of nuclear power plant operators is needed. Making use of simulator of nuclear power plant as research platform, and taking the present international reliability research model-human cognition reliability for reference, the part of the model is modified according to the actual status of Chinese nuclear power plant operators and the research model of Chinese nuclear power plant operators obtained based on two-parameter Weibull distribution. Experiments about the reliability of nuclear power plant operators are carried out using the two-parameter Weibull distribution research model. Compared with those in the world, the same results are achieved. The research would be beneficial to the operation safety of nuclear power plant

  4. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  5. Photovoltaic Reliability Performance Model v 2.0

    Energy Technology Data Exchange (ETDEWEB)

    2016-12-16

    PV-RPM is intended to address more “real world” situations by coupling a photovoltaic system performance model with a reliability model so that inverters, modules, combiner boxes, etc. can experience failures and be repaired (or left unrepaired). The model can also include other effects, such as module output degradation over time or disruptions such as electrical grid outages. In addition, PV-RPM is a dynamic probabilistic model that can be used to run many realizations (i.e., possible future outcomes) of a system’s performance using probability distributions to represent uncertain parameter inputs.

  6. Improving Reliability and Operational Availability of Military Systems

    National Research Council Canada - National Science Library

    Koehn, Phillip

    2004-01-01

    ...: overhaul and prognostics asset management strategies. It is shown that the prognostics approach leads to improved operational availability by anticipating failure and reducing administrative and logistics delays...

  7. NKA/KRU project on operator training, control room designing and human reliability. Summary report

    International Nuclear Information System (INIS)

    1981-06-01

    A Nordic integrated project on human reliability in the conditions of new advanced technology seeks to establish: - The actual repertoire of activities and tasks performed by the operating staff of a nuclear power plant and its dependence on the present and future levels of automation. - The knowledge required for these activities and appropriate means for training plant operators and for competence evaluation and retraining in coping with the rare events. - Models of human operator performance; how do operators read information and make decisions under normal and abnormal plant conditions and how does their performance depend upon control room design. - The typical limits of human capabilities and mechanisms of human errors as they are represented in existing records of incidents and accidents in industrial plants. - The use of process computers for improved design of data presentation and operator support systems, especially for disturbance analysis and diagnosis during infrequent plant disturbance. - Development of experimental techniques to validate research results and proposals for improved man/machine interfaces and other computer-based support systems. (EG)

  8. Operator performance and annunciation sounds

    International Nuclear Information System (INIS)

    Patterson, B.K.; Bradley, M.T.; Artiss, W.G.

    1997-01-01

    This paper discusses the audible component of annunciation found in typical operating power stations. The purpose of the audible alarm is stated and the psychological elements involved in the human processing of alarm sounds is explored. Psychological problems with audible annunciation are noted. Simple and more complex improvements to existing systems are described. A modern alarm system is suggested for retrofits or new plant designs. (author)

  9. Operator performance and annunciation sounds

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, B K; Bradley, M T; Artiss, W G [Human Factors Practical, Dipper Harbour, NB (Canada)

    1998-12-31

    This paper discusses the audible component of annunciation found in typical operating power stations. The purpose of the audible alarm is stated and the psychological elements involved in the human processing of alarm sounds is explored. Psychological problems with audible annunciation are noted. Simple and more complex improvements to existing systems are described. A modern alarm system is suggested for retrofits or new plant designs. (author) 3 refs.

  10. Post-event human decision errors: operator action tree/time reliability correlation

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R E; Fragola, J; Wreathall, J

    1982-11-01

    This report documents an interim framework for the quantification of the probability of errors of decision on the part of nuclear power plant operators after the initiation of an accident. The framework can easily be incorporated into an event tree/fault tree analysis. The method presented consists of a structure called the operator action tree and a time reliability correlation which assumes the time available for making a decision to be the dominating factor in situations requiring cognitive human response. This limited approach decreases the magnitude and complexity of the decision modeling task. Specifically, in the past, some human performance models have attempted prediction by trying to emulate sequences of human actions, or by identifying and modeling the information processing approach applicable to the task. The model developed here is directed at describing the statistical performance of a representative group of hypothetical individuals responding to generalized situations.

  11. Post-event human decision errors: operator action tree/time reliability correlation

    International Nuclear Information System (INIS)

    Hall, R.E.; Fragola, J.; Wreathall, J.

    1982-11-01

    This report documents an interim framework for the quantification of the probability of errors of decision on the part of nuclear power plant operators after the initiation of an accident. The framework can easily be incorporated into an event tree/fault tree analysis. The method presented consists of a structure called the operator action tree and a time reliability correlation which assumes the time available for making a decision to be the dominating factor in situations requiring cognitive human response. This limited approach decreases the magnitude and complexity of the decision modeling task. Specifically, in the past, some human performance models have attempted prediction by trying to emulate sequences of human actions, or by identifying and modeling the information processing approach applicable to the task. The model developed here is directed at describing the statistical performance of a representative group of hypothetical individuals responding to generalized situations

  12. Optimization of a PCRAM Chip for high-speed read and highly reliable reset operations

    Science.gov (United States)

    Li, Xiaoyun; Chen, Houpeng; Li, Xi; Wang, Qian; Fan, Xi; Hu, Jiajun; Lei, Yu; Zhang, Qi; Tian, Zhen; Song, Zhitang

    2016-10-01

    The widely used traditional Flash memory suffers from its performance limits such as its serious crosstalk problems, and increasing complexity of floating gate scaling. Phase change random access memory (PCRAM) becomes one of the most potential nonvolatile memories among the new memory techniques. In this paper, a 1M-bit PCRAM chip is designed based on the SMIC 40nm CMOS technology. Focusing on the read and write performance, two new circuits with high-speed read operation and highly reliable reset operation are proposed. The high-speed read circuit effectively reduces the reading time from 74ns to 40ns. The double-mode reset circuit improves the chip yield. This 1M-bit PCRAM chip has been simulated on cadence. After layout design is completed, the chip will be taped out for post-test.

  13. Operational safety system performance alternative to the WANO's indicator

    International Nuclear Information System (INIS)

    Lyra, Moacir

    2002-01-01

    One of the operational safety performance indicators recommended by the World Association of Nuclear Operators (WANO) and adopted by Electronuclear is the reliability of the safety systems. The parameter selected to represent this indicator is the average unavailability of the trains of the concerned system. This parameter would be universally representative of the reliability for comparison purpose only if all nuclear power plants were designed within the same redundancy criteria. Considering the diversity of design criteria of the power plants in operation and based on a probabilistic approach, this paper proposes new performance indicators which are comparable regardless the redundancy criteria of the system. A case example applied to a system of the Angra 2 nuclear power plant shows that, even though with the plant in the infancy phase, the performance of the system in the period is very good. (author)

  14. Impact of nuclear fuel performance and reliability in a deregulated electricity market

    International Nuclear Information System (INIS)

    Barnoski, M.; Kaiser, B.

    1997-01-01

    US nuclear plants are now placing a great deal of importance on fuel performance and reliability because of their direct effect on a plant's capacity factor, availability, operating flexibility, outage duration, and worker exposure. This is reflected by utilities making fuel reliability a principal vendor evaluation criterion and making fuel performance an important bonus/penalty provision. Defect-free fuel, combined with ever improving design features, makes it possible for plants to operate at higher outputs while reducing operating and maintenance costs. Higher electrical output at lower cost is essential for US nuclear plants to meet the expected competition in a deregulated market. Through continued investment in manufacturing improvements and a vigilant, systematic design process, ABB's nuclear fuel has contributed to helping its nuclear utility customers reduce their cost of doing business. (author) 1 fig., 1 tab

  15. Performance Indicators of Operating Reactors

    Data.gov (United States)

    Nuclear Regulatory Commission — A list of Performance Indicators (PI) that are reported to the NRC by licensees at the end of each quarter in accordance with Inspection Manual Chapters (IMC) 0608,...

  16. Research on Control Method Based on Real-Time Operational Reliability Evaluation for Space Manipulator

    Directory of Open Access Journals (Sweden)

    Yifan Wang

    2014-05-01

    Full Text Available A control method based on real-time operational reliability evaluation for space manipulator is presented for improving the success rate of a manipulator during the execution of a task. In this paper, a method for quantitative analysis of operational reliability is given when manipulator is executing a specified task; then a control model which could control the quantitative operational reliability is built. First, the control process is described by using a state space equation. Second, process parameters are estimated in real time using Bayesian method. Third, the expression of the system's real-time operational reliability is deduced based on the state space equation and process parameters which are estimated using Bayesian method. Finally, a control variable regulation strategy which considers the cost of control is given based on the Theory of Statistical Process Control. It is shown via simulations that this method effectively improves the operational reliability of space manipulator control system.

  17. Strategy for establishing integrated l and c reliability of operating nuclear power plants in korea

    International Nuclear Information System (INIS)

    Kang, H. T.; Chung, H. Y.; Lee, Y. H.

    2008-01-01

    Korea hydro and nuclear power co. (KHNP) are in progress of developing a integrated I and C reliability establishing strategy for managing l and C obsolescence and phasing in new technology that both meets the needs of the fleet and captures the benefits of applying proven solutions to multiple plants, with reduced incremental costs. In view of this, we are developing I and C component management which covers major failure mode, symptom of performance degradation, condition-based or time-based preventive management (PM), monitoring, and failure finding and correction based on equipment reliability (ER). Furthermore, for the l and C system replacement management, we are in progress of 3-year-long I and C systems upgrade fundamental designing in developing the long-term major l and C systems implementation plan to improve plant operations, eliminate operator challenges, reduce maintenance costs, and cope with the challenges of component obsolescence. For accomplishing I and C digital upgrade in near future, we chose demonstration plant, Younggwang (YGN) unit 3 and 4 which are Korean Standard Nuclear Power Plant (KSNP). In this paper, we established the long term reliability strategy of I and C system based on ER in component replacement and furthermore I and C systems digital upgrade in system replacement. (authors)

  18. Reliability analysis of meteorological data registered during nuclear power plant normal operation

    International Nuclear Information System (INIS)

    Amado, V.; Ulke, A.; Marino, B.; Thomas, L.

    2011-01-01

    The atmosphere is the environment in which gaseous radioactive discharges from nuclear power plants are transported. It is therefore essential to have reliable meteorological information to characterize the dispersion and feed evaluation models and radiological environmental impact during normal operation of the plant as well as accidental releases. In this way it is possible to determine the effects on the environment and in humans. The basic data needed to represent adequately the local weather include air temperature, wind speed and direction, rainfall, humidity and pressure. On the other hand, specific data consistent with the used model is required to determine the turbulence, for instance, radiation, cloud cover and vertical temperature gradient. It is important that the recorded data are representative of the local meteorology. This requires, first, properly placed instruments, that should be kept in operation and undergoing maintenance on a regular basis. Second, but equally substantial, a thorough analysis of its reliability must be performed prior to storage and/or data processing. In this paper we present the main criteria to consider choosing the location of a meteorological tower in the area of a nuclear power plant and propose a methodology for assessing the reliability of recorded data. The methodology was developed from the analysis of meteorological data registered in nuclear power plants in Argentina. (authors) [es

  19. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  20. Comprehensive Performance Nutrition for Special Operations Forces.

    Science.gov (United States)

    Daigle, Karen A; Logan, Christi M; Kotwal, Russ S

    2015-01-01

    Special Operations Forces (SOF) training, combat, and contingency operations are unique and demanding. Performance nutrition within the Department of Defense has emphasized that nutrition is relative to factors related to the desired outcome, which includes successful performance of mentally and physically demanding operations and missions of tactical and strategic importance, as well as nonoperational assignments. Discussed are operational, nonoperational, and patient categories that require different nutrition strategies to facilitate category-specific performance outcomes. Also presented are 10 major guidelines for a SOF comprehensive performance nutrition program, practical nutrition recommendations for Special Operators and medical providers, as well as resources for dietary supplement evaluation. Foundational health concepts, medical treatment, and task-specific performance factors should be considered when developing and systematically implementing a comprehensive SOF performance nutrition program. When tailored to organizational requirements, SOF unit- and culture-specific nutrition education and services can optimize individual Special Operator performance, overall unit readiness, and ultimately, mission success. 2015.

  1. Reliability and risk evaluation of a port oil pipeline transportation system in variable operation conditions

    International Nuclear Information System (INIS)

    Soszynska, Joanna

    2010-01-01

    The semi-Markov model of the system operation processes is proposed and its selected characteristics are determined. A system composed on multi-state components is considered and its reliability and risk characteristics are found. Next, the joint model of the system operation process and the system multi-state reliability is applied to the reliability and risk evaluation of the port oil pipeline transportation system. The pipeline system is described and its operation process unknown parameters are identified on the basis of real statistical data. The mean values of the pipeline system operation process unconditional sojourn times in particular operation states are found and applied to determining this process transient probabilities in these states. The piping different reliability structures in various its operation states are fixed and their conditional reliability functions on the basis of data coming from experts are approximately determined. Finally, after applying earlier estimated transient probabilities and system conditional reliability functions in particular operation states the unconditional reliability function, the mean values and standard deviations of the pipeline lifetimes in particular reliability states, risk function and the moment when the risk exceeds a critical value are found.

  2. Reliability and risk evaluation of a port oil pipeline transportation system in variable operation conditions

    Energy Technology Data Exchange (ETDEWEB)

    Soszynska, Joanna, E-mail: joannas@am.gdynia.p [Department of Mathematics, Gdynia Maritime University, ul. Morska 83, 81-225 Gdynia (Poland)

    2010-02-15

    The semi-Markov model of the system operation processes is proposed and its selected characteristics are determined. A system composed on multi-state components is considered and its reliability and risk characteristics are found. Next, the joint model of the system operation process and the system multi-state reliability is applied to the reliability and risk evaluation of the port oil pipeline transportation system. The pipeline system is described and its operation process unknown parameters are identified on the basis of real statistical data. The mean values of the pipeline system operation process unconditional sojourn times in particular operation states are found and applied to determining this process transient probabilities in these states. The piping different reliability structures in various its operation states are fixed and their conditional reliability functions on the basis of data coming from experts are approximately determined. Finally, after applying earlier estimated transient probabilities and system conditional reliability functions in particular operation states the unconditional reliability function, the mean values and standard deviations of the pipeline lifetimes in particular reliability states, risk function and the moment when the risk exceeds a critical value are found.

  3. Performers and performance : how to investigate the contribution of the operational network to operational performance

    NARCIS (Netherlands)

    Wijngaard, J.; Vries, J. de; Nauta, A.

    2006-01-01

    Purpose This paper seeks to explore the question of how to investigate the contribution of the operational network (comprising sales service, logistics, planning, production, etc.) to operational performance. In doing so, the paper aims to link concepts from organisational and social psychology to

  4. Performers and performance : How to investigate the contribution of the operational network to operational performance

    NARCIS (Netherlands)

    Wijngaard, J.; de Vries, J.; Nauta, Aukje

    2006-01-01

    Purpose - This paper seeks to explore the question of how to investigate the contribution of the operational network (comprising sales service, logistics, planning, production, etc.) to operational performance. In doing so, the paper aims to link concepts from organisational and social psychology to

  5. Modelling ship operational reliability over a mission under regular inspections

    NARCIS (Netherlands)

    Christer, A.H.; Lee, S.K.

    1997-01-01

    A ship is required to operate for a fixed mission period. Should a critical item of equipment fail at sea, the ship is subject to a costly event with potentially high risk to ship and crew. Given warning of a pending defect, the ship can try to return to port under its own power and thus attempt to

  6. Time-dependent reliability analysis of nuclear reactor operators using probabilistic network models

    International Nuclear Information System (INIS)

    Oka, Y.; Miyata, K.; Kodaira, H.; Murakami, S.; Kondo, S.; Togo, Y.

    1987-01-01

    Human factors are very important for the reliability of a nuclear power plant. Human behavior has essentially a time-dependent nature. The details of thinking and decision making processes are important for detailed analysis of human reliability. They have, however, not been well considered by the conventional methods of human reliability analysis. The present paper describes the models for the time-dependent and detailed human reliability analysis. Recovery by an operator is taken into account and two-operators models are also presented

  7. Evaluating Robot-Operator Job Performance

    National Research Council Canada - National Science Library

    Moses, Franklin L; Brooks, Peter S; Hofmann, M; Johnson, E; Laveson, J; Zaccaro, S

    2007-01-01

    .... Tests that do include performance of the human operator often rely on qualitative observations -- observer judgments and interviews about workload, situation awareness, cognitive issues, and so on...

  8. A Regulatory Perspective on the Performance and Reliability of Nuclear Passive Safety Systems

    International Nuclear Information System (INIS)

    Quan, Pham Trung; Lee, Sukho

    2016-01-01

    Passive safety systems have been proven to enhance the safety of NPPs. When an accident such as station blackout occurs, these systems can perform the following functions: the decay heat removal, passive safety injection, containment cooling, and the retention of radioactive materials. Following the IAEA definitions, using passive safety systems reduces reliance on active components to achieve proper actuation and not requiring operator intervention in accident conditions. That leads to the deviations in boundary conditions of the critical process or geometric parameters, which activate and operate the system to perform accident prevention and mitigation functions. The main difficulties in evaluation of functional failure of passive systems arise because of (a) lack of plant operational experience; (b) scarcity of adequate experimental data from integral test facilities or from separate effect tests in order to understand the performance characteristics of these passive systems, not only at normal operation but also during accidents and transients; (c) lack of accepted definitions of failure modes for these systems; and (d) difficulty in modeling certain physical behavior of these systems. Reliability assessment of the PSS is still one of the important issues. Several reliability methodologies such as REPAS, RMPS and ASPRA have been applied to the reliability assessments. However, some issues are remained unresolved due to lack of understanding of the treatment of dynamic failure characteristics of components of the PSS, the treatment of dynamic variation of independence process parameters such as ambient temperature and the functional failure criteria of the PSS. Dynamic reliability methodologies should be integrated in the PSS reliability analysis to have a true estimate of system failure probability. The methodology should estimate the physical variation of the parameters and the frequency of the accident sequences when the dynamic effects are considered

  9. The role of human reliability analysis for enhancing crew performance

    International Nuclear Information System (INIS)

    Hannaman, G.W.; Joksimovich, V.; Worledge, D.H.; Spurgin, A.J.

    1986-01-01

    This paper summarizes some aspects of EPRI-sponsored research undertaken in support of improving the PRA technology. In particular, the consideration of how human actions that impact accident sequences can be analyzed in a systematic way to supplement the type of ergonomic studies normally carried out in support of control room design. The HRA/PRA approach described not only identifies the operator information and interface needs, but also helps to identify issues and areas for additional research. The process includes a link to data collections. Preliminary collections of data and analytical benchmark support the idea that such analytical frameworks and models provide support for ranking the importance of various human reliability issues

  10. Reliability performance testing of totally encapsulating chemical protective suits

    International Nuclear Information System (INIS)

    Johnson, J.S.; Swearengen, P.M.

    1991-01-01

    The need to assure a high degree of reliability for totally encapsulating chemical protective (TECP) suits has been recognized by Lawrence Livermore National Laboratory's (LLNL) Hazards Control Department for some time. The following four tests were proposed as necessary to provide complete evaluation of TECP suit performance: 1. Quantitative leak test (ASTM draft), 2. Worst-case chemical exposure test (conceptual), 3. Pressure leak-rate test (complete, ASTM F1057-87), and 4. Chemical leak-rate test (ASTM draft). This paper reports on these tests which should be applied to measuring TECP suit performance in two stages: design qualification tests and field use tests. Test 1, 2, and 3 are used as design qualification tests, and tests 3 and 4 are used as field use tests

  11. Human reliability assessment on the basis of operating experience

    International Nuclear Information System (INIS)

    Straeter, O.

    1997-01-01

    For development of methodology, available models for qualitative assessment of human errors (e.g. by Swain, Hacker, Rasmussen) and a variety of known systematic approaches for quantitiative assessment of inadequate human action (e.g. THERP, ASEP, HCR, SLIM) were taken as a basis to establish a job specification, which in turn was used for developing a method for acquisition, characterisation and evaluation of errors. This method encompasses the two processes of event analysis and event evaluation: The first step comprises analysis of events by analysis of information describing the conditions and scenarios of relevance to the inadequate human action examined. In addition to the description of process sequences, information is taken into account on possible conditions that may bring about failure. As an assessment of human reliability requires manifold approaches for evaluation, a connectionistic procedure was developed for evaluation of the compilation of events based on a debate about various approaches from the domain of artificial intelligence (AI). This procedure yields both qualitative and quantitative information through a homogenous approach. (orig./GL) [de

  12. Verification and validation--The key to operating plant software reliability

    International Nuclear Information System (INIS)

    Daughtrey, H.T.; Daggett, P.W.; Schamp, C.A.

    1983-01-01

    This paper discusses the design and implementation of a verification and validation (V and V) plan for reviewing the microcomputer software developed for a Safety Parameter Display System (SPDS). Topics considered include a historical perspective on V and V, the function and significance of SPDS software, and testing. An SPDS provides information to nuclear power plant operators about the status of the plant under all operating conditions. It is determined that by implementing V and V activities throughout the development cycle, problems are less expensive to locate in the early phases of software development, problems are less expensive to fix in the early phases of software development, and a parallel V and V activity is more cost effective than a similar effort performed only at the end of software development. It is concluded that V and V is a proven tool for improving power plant software reliability

  13. Reliability evaluation of a port oil transportation system in variable operation conditions

    International Nuclear Information System (INIS)

    Soszynska, Joanna

    2006-01-01

    The semi-Markov model of the system operation processes is proposed and its selected parameters are determined. The series 'm out of k n ' multi-state system is considered and its reliability and risk characteristics are found. Next, the joint model of the system operation process and the system multi-state reliability and risk is constructed. Moreover, reliability and risk evaluation of the multi-state series 'm out of k n ' system in its operation process is applied to the port oil transportation system

  14. Reliability evaluation of a port oil transportation system in variable operation conditions

    Energy Technology Data Exchange (ETDEWEB)

    Soszynska, Joanna [Department of Mathematics, Gdynia Maritime University, ul. Morska 83, 81-225 Gdynia (Poland)]. E-mail: joannas@am.gdynia.pl

    2006-04-15

    The semi-Markov model of the system operation processes is proposed and its selected parameters are determined. The series 'm out of k {sub n}' multi-state system is considered and its reliability and risk characteristics are found. Next, the joint model of the system operation process and the system multi-state reliability and risk is constructed. Moreover, reliability and risk evaluation of the multi-state series 'm out of k {sub n}' system in its operation process is applied to the port oil transportation system.

  15. Effect of communication on the reliability of nuclear power plant control room operations - pre study

    International Nuclear Information System (INIS)

    Kettunen, Jari; Pyy, Pekka

    1999-01-01

    The objective of the study presented in this paper is to investigate communication practices and their impact on human reliability and plant safety in a nuclear power plant environment. The study aims at developing a general systems approach towards the issue. The ultimate goal of the study is to contribute to the development of probabilistic safety assessment methodologies in the area of communications and crew co-operation. This paper outlines the results of the pre-study. The study is based on the use and further development of different modelling techniques and the application of generic systems engineering as well as crew resource management (CRM) principles. The results so far include a concise literature review on communication and crew performance, a presentation of some potential theoretical concepts and approaches for studying communication in relation to organisational reliability, causal failure sequences and human failures mechanisms, and an introduction of a General Communications Model (GCM) that is presented as a promising approach for studying the reliability and adequacy of communication transactions. Finally, some observations and recommendation concerning next phases of the study are made (author) (ml)

  16. Brain performance enhancement for military operators

    NARCIS (Netherlands)

    Erp, J.B.F.; Reschke, S.; Grootjen, M.; Brouwer, A.-M.

    2009-01-01

    Performance of military operators depends on both physical and cognitive aspects. Enhancement of operator performance should therefore address both the body and the brain. This paper focuses on the latter. We provide an extended list of areas where neuroscientific knowledge may be important like

  17. An analysis of operational experience during low power and shutdown and a plan for addressing human reliability assessment issues

    International Nuclear Information System (INIS)

    Barriere, M.; Luckas, W.; Whitehead, D.; Ramey-Smith, A.

    1994-06-01

    Recent nuclear power plant events (e.g. Chernobyl, Diablo Canyon, and Vogtle) and US Nuclear Regulatory Commission (NRC) reports (e.g. NUREG-1449) have led to concerns regarding human reliability during low power and shutdown (LP ampersand S) conditions and limitations of human reliability analysis (HRA) methodologies in adequately representing the LP ampersand S environment. As a result of these concerns, the NRC initiated two parallel research projects to assess the influence of LP ampersand S conditions on human reliability through an analysis of operational experience at pressurized water reactors (PWRs) an boiling water reactors (BWRs). These research projects, performed by Brookhaven National Laboratory for PWRS, and Sandia National Laboratories for BWRs, identified unique aspects of human performance during LP ampersand S conditions and provided a program plan for research and development necessary to improve existing HRA methodologies. This report documents the results of the analysis of LP ampersand S operating experience and describes the improved HRA program plan

  18. Balancing low cost with reliable operation in the rotordynamic design of the ALS Liquid Hydrogen Fuel Turbopump

    Science.gov (United States)

    Greenhill, L. M.

    1990-01-01

    The Air Force/NASA Advanced Launch System (ALS) Liquid Hydrogen Fuel Turbopump (FTP) has primary design goals of low cost and high reliability, with performance and weight having less importance. This approach is atypical compared with other rocket engine turbopump design efforts, such as on the Space Shuttle Main Engine (SSME), which emphasized high performance and low weight. Similar to the SSME turbopumps, the ALS FTP operates supercritically, which implies that stability and bearing loads strongly influence the design. In addition, the use of low cost/high reliability features in the ALS FTP such as hydrostatic bearings, relaxed seal clearances, and unshrouded turbine blades also have a negative influence on rotordynamics. This paper discusses the analysis conducted to achieve a balance between low cost and acceptable rotordynamic behavior, to ensure that the ALS FTP will operate reliably without subsynchronous instabilities or excessive bearing loads.

  19. A new approach for reliability analysis with time-variant performance characteristics

    International Nuclear Information System (INIS)

    Wang, Zequn; Wang, Pingfeng

    2013-01-01

    Reliability represents safety level in industry practice and may variant due to time-variant operation condition and components deterioration throughout a product life-cycle. Thus, the capability to perform time-variant reliability analysis is of vital importance in practical engineering applications. This paper presents a new approach, referred to as nested extreme response surface (NERS), that can efficiently tackle time dependency issue in time-variant reliability analysis and enable to solve such problem by easily integrating with advanced time-independent tools. The key of the NERS approach is to build a nested response surface of time corresponding to the extreme value of the limit state function by employing Kriging model. To obtain the data for the Kriging model, the efficient global optimization technique is integrated with the NERS to extract the extreme time responses of the limit state function for any given system input. An adaptive response prediction and model maturation mechanism is developed based on mean square error (MSE) to concurrently improve the accuracy and computational efficiency of the proposed approach. With the nested response surface of time, the time-variant reliability analysis can be converted into the time-independent reliability analysis and existing advanced reliability analysis methods can be used. Three case studies are used to demonstrate the efficiency and accuracy of NERS approach

  20. Track 2- major components reliability and materials issues. Some performance indicators of PWR steam generators

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.; Riznic, J.

    2001-01-01

    The monitoring of operational performance is a crucial aspect of the management of equipment operation and maintenance in many industries, including nuclear and thermal power plants. Monitoring involves the collection and analysis of data on the operation. In these paper an analysis was made of steam generators in operation, i.e., their malfunctions during the plant life cycle with the aim of studying the characteristics of failure rate and repair rate. These values are necessary parameters if we are to determine the reliability and availability of the steam generator as a basis for the analysis of its effect on the safety and efficiency of the nuclear power plant. We analyzed IAEA available data for period from 1971 to 1998. Each steam generator was monitored individually during plants' lifetime. The data on steam generator failures were presented in uniform format, allowing the consistency in failure classification and data reporting. Operational presence of the analyzed steam generators is given for each calendar year and each lifetime year: the failure rate l and repair rate m with associated boundaries are calculated. The general trends in calendar years performance indicators (μ) of steam generators is investigated. The distributions of lifetime l and m are formed, as a complement to the analysis of calendar years performance indicators. With aspect of steam generators influence on reliability and availability of nuclear power plants, the empirical probability distribution for failure rates and repair rates are also constructed. (author)

  1. Utilizing clad piping to improve process plant piping integrity, reliability, and operations

    International Nuclear Information System (INIS)

    Chakravarti, B.

    1996-01-01

    During the past four years carbon steel piping clad with type 304L (UNS S30403) stainless steel has been used to solve the flow accelerated corrosion (FAC) problem in nuclear power plants with exceptional success. The product is designed to allow ''like for like'' replacement of damaged carbon steel components where the carbon steel remains the pressure boundary and type 304L (UNS S30403) stainless steel the corrosion allowance. More than 3000 feet of piping and 500 fittings in sizes from 6 to 36-in. NPS have been installed in the extraction steam and other lines of these power plants to improve reliability, eliminate inspection program, reduce O and M costs and provide operational benefits. This concept of utilizing clad piping in solving various corrosion problems in industrial and process plants by conservatively selecting a high alloy material as cladding can provide similar, significant benefits in controlling corrosion problems, minimizing maintenance cost, improving operation and reliability to control performance and risks in a highly cost effective manner. This paper will present various material combinations and applications that appear ideally suited for use of the clad piping components in process plants

  2. Study on Performance Shaping Factors (PSFs) Quantification Method in Human Reliability Analysis (HRA)

    International Nuclear Information System (INIS)

    Kim, Ar Ryum; Jang, Inseok Jang; Seong, Poong Hyun; Park, Jinkyun; Kim, Jong Hyun

    2015-01-01

    The purpose of HRA implementation is 1) to achieve the human factor engineering (HFE) design goal of providing operator interfaces that will minimize personnel errors and 2) to conduct an integrated activity to support probabilistic risk assessment (PRA). For these purposes, various HRA methods have been developed such as technique for human error rate prediction (THERP), simplified plant analysis risk human reliability assessment (SPAR-H), cognitive reliability and error analysis method (CREAM) and so on. In performing HRA, such conditions that influence human performances have been represented via several context factors called performance shaping factors (PSFs). PSFs are aspects of the human's individual characteristics, environment, organization, or task that specifically decrements or improves human performance, thus respectively increasing or decreasing the likelihood of human errors. Most HRA methods evaluate the weightings of PSFs by expert judgment and explicit guidance for evaluating the weighting is not provided. It has been widely known that the performance of the human operator is one of the critical factors to determine the safe operation of NPPs. HRA methods have been developed to identify the possibility and mechanism of human errors. In performing HRA methods, the effect of PSFs which may increase or decrease human error should be investigated. However, the effect of PSFs were estimated by expert judgment so far. Accordingly, in order to estimate the effect of PSFs objectively, the quantitative framework to estimate PSFs by using PSF profiles is introduced in this paper

  3. Status of Siemens steam generator design and measures to assure continuous long-term reliable operation

    International Nuclear Information System (INIS)

    Hoch, G.

    1999-01-01

    Operating pressurized water reactors with U-tube steam generators have encountered difficulties with either one or a combination of inadequate material selection, poor design or manufacturing and an insufficient water chemistry control which resulted in excessive tube degradation. In contrast to the above mentioned problems, steam generators from Siemens/KWU are proving by operating experience that all measures undertaken at the design stage as well as during the operating and maintenance phase were effective enough to counteract any tube corrosion phenomena or other steam generator related problem. An Integrated Service Concept has been developed, applied and wherever necessary improved in order to ensure reliable steam generator operation. The performance of the steam generators is updated continuously, evaluated and implemented in lifetime databases. The main indicator for steam generator integrity are the results of the eddy current testing of the steam generator tubes. Tubes with indications are rated with lifetime threshold values and if necessary plugged, based on individual assessment criteria.(author)

  4. Mission reliability of semi-Markov systems under generalized operational time requirements

    International Nuclear Information System (INIS)

    Wu, Xiaoyue; Hillston, Jane

    2015-01-01

    Mission reliability of a system depends on specific criteria for mission success. To evaluate the mission reliability of some mission systems that do not need to work normally for the whole mission time, two types of mission reliability for such systems are studied. The first type corresponds to the mission requirement that the system must remain operational continuously for a minimum time within the given mission time interval, while the second corresponds to the mission requirement that the total operational time of the system within the mission time window must be greater than a given value. Based on Markov renewal properties, matrix integral equations are derived for semi-Markov systems. Numerical algorithms and a simulation procedure are provided for both types of mission reliability. Two examples are used for illustration purposes. One is a one-unit repairable Markov system, and the other is a cold standby semi-Markov system consisting of two components. By the proposed approaches, the mission reliability of systems with time redundancy can be more precisely estimated to avoid possible unnecessary redundancy of system resources. - Highlights: • Two types of mission reliability under generalized requirements are defined. • Equations for both types of reliability are derived for semi-Markov systems. • Numerical methods are given for solving both types of reliability. • Simulation procedure is given for estimating both types of reliability. • Verification of the numerical methods is given by the results of simulation

  5. Human performance and reliability studies on nuclear power plant

    International Nuclear Information System (INIS)

    Miyaoka, S.

    1988-01-01

    The TMI accident in USA, the Chernobyl accident in USSR and other major accidents overseas have shown that it is necessary to investigate and research human factor problems related to operation, maintenance and others in order to increase the safety and reliability of nuclear power plants. Although a variety of countermeasures have been devised, the accidents and failures due to human factors still occur. So far, the problems related to human factors have not been fundamantally and systematically investigated. Also the data base related to this problem has not been developed. Therefore, the government and electric utility industry began the research on the prevention of the accidents caused by human errors. The basic research is carried out by the government, and the applied research is done by electric utility industry. The Central Research Institute of Electric Power Industry established the Human Factors Research Center on July 1, 1987. The research program in the Human Factors Research Center is divided into the basic research to clarity fundamental human characteristics, the systematic research to apply this information and the analytical research on human error experience. These research activities are reported. (Kako, I.)

  6. DEVELOPING OF INDIVIDUAL INSTRUMENT PERFORMANCE ANXIETY SCALE: VALIDITY - RELIABILITY STUDY

    Directory of Open Access Journals (Sweden)

    Esra DALKIRAN

    2014-07-01

    Full Text Available The purpose of this study is to develop a scale unique to our culture, concerning  individual instrument performance anxiety of the students  who are getting instrument training  in the Department of Music Education. In the study, the descriptive research model is used and qualitative research techniques are utilized. The study population consists of the students attending the 23 universities which has Music Education Department. The sample of the study consists of 438 girls and 312 boys, totally 750 students  who are studying in the Department of Music Education of randomly selected 10 universities. As a result of the explanatory and confirmatory factor analyses that were performed, a one-dimensional structure consisting of 14 items was obtained. Also, t-scores and  the coefficient scores of total item correlation concerning the distinguishing power of the items, the difference in the scores of the set of lower and upper 27% was calculated, and it was observed that the items are distinguishing as a result of both analyses. Of the scale, Cronbach's alpha coefficient of internal consistency was calculated as .94, and test-retest reliability coefficient was calculated as .93. As a result, a valid and reliable assessment and evaluation instrument that measures the exam performance anxiety of the students studying in the Department of Music Education, has been developed.Extended AbstractsIntroductionAnxiety is a universal phenomenon which people experience once or a few times during lives. It was accepted as concern for the future or as an unpleasant emotional experience regarding probable hitches of the events (Di Tomasso & Gosch, 2002.In general, the occasions on which negative feelings are experienced cause anxiety to arise (Baltaş and Baltaş, 2000. People also feel anxious in dangerous situations. Anxiety may lead a person to be creative, while it may have hindering characteristics. Anxiety is that an individual considers him

  7. Operating performance of the prototype heavy water reactor Fugen

    International Nuclear Information System (INIS)

    1984-01-01

    Since the full scale operation was started in March, 1979, the ATR Fugen power station has been verifying the performance and reliability of the machinery and equipment, uranium-plutonium mixed oxide fuel and so on, and obtaining the technical prospect for putting ATRs in practical use by accumulating operation and maintenance techniques, through about five years of operation. In this report, the operational results of the Fugen power station are described. Fugen is a heavy water-moderated, boiling light water-cooled, pressure tube type reactor with 165 MWe output. As of the end of March, 1984, the total generated electric power was about 4.3 billion kWh, and the operation time was about 27,000 hours. The mean capacity ratio reached 58.8%. During the operation period, troubles including plant shutdown occurred eight times, but generally the performance and reliability of the machinery and equipment have been good. 580 fuels including 284 MOX fuels have been charged, but fuel breaking did not occur at all. The consumption of heavy water and the leak of tritium did not cause problem. The management of the core and fuel, the management of maintenance, the quality control of cooling water and heavy water, radiation control and the management of wastes are reported. (Kako, I.)

  8. Indicators to monitor NPP operational safety performance

    International Nuclear Information System (INIS)

    Gomez-Cobo, Ana

    2002-01-01

    Since December 1995 the IAEA activities on safety performance indicators focused on the elaboration of a framework for the establishment of an operational safety performance indicator programme. The development of this framework began with the consideration of the concept of NPP operational safety performance and the identification of operational safety attributes. For each operational safety attribute, overall indicators, envisioned as providing an overall evaluation of relevant aspects of safety performance, were established. Associated with each overall indicator is a level of strategic indicators intended to provide a bridge from overall to specific indicators. Finally each strategic indicator was supported by a set of specific indicators, which represent quantifiable measures of performance. The programme development was enhanced by pilot plant studies, conducted over a 15 month period from January 1998 to March 1999. The result of all this work is compiled in the IAEA-TECDOC-1141, to be published shortly. This paper presents a summary of this IAEA TECDOC. It describes the operational safety performance indicator framework proposed and discusses the results of and lessons learned from the pilot studies. Despite the efforts described, it is clear that additional research is still necessary in areas such as plant-specific adaptation of proposed frameworks in order to suit individual data collection systems and plant characteristics, indicator selection, indicator definition, goal setting, action thresholds, analysis of trends, indicator display systems, analysis of overall safety performance (i.e., aggregation or combination of indicators), safety culture indicators, qualitative indicators, and use of additional indicators to address issues such as industrial safety attitude and performance, staff welfare, and environmental compliance. This is the rationale for a new IAEA Coordinated Research Project on 'Development and application of indicators to monitor NPP

  9. Reliability data bank in electronics: ITALTEL experience over 10 years of operation

    International Nuclear Information System (INIS)

    Turconi, G.

    1986-01-01

    The purpose of this paper is to show the Italtel Reliability Data Bank experience in electronics after ten years from data bank creation. Technological evolution on systems and equipment have originated a reliability data bank evolution in order to maintain and improve its performances. This paper will describe the concepts employed to design the today data bank features enabling it to be an important Company tool for reliability activities. (orig.)

  10. Early operating and reliability experience with the CEBAF DC magnet power supplies

    International Nuclear Information System (INIS)

    Merz, W.; Flood, R.; Martin, E.J.; O'Sullivan, M.

    1996-01-01

    The CEBAF accelerator is a five pass, recirculating, CW electron linear accelerator. There are a total of nine recirculation arcs connecting the two linacs. Three experimental halls are serviced by the accelerator through separate transport channels. The magnet powering system for CEBAF consists of approximately 2000 independent control channels. About 1850 of these channels are low current, trim magnet power supplies. There are 28 higher power supplies used to energize the major bending elements. Over one hundred, 20 amp, active shunts are used to vary current in selected magnets in the major dipole strings. The majority of the magnetic elements are concentrated in the arcs and transport channels. The correction dipoles, quadrupoles and sextupoles are each powered individually be a dedicated trim power supply channel. The arc and extraction channel dipoles are powered in series strings by the high powered supplies, known locally at CEBAF as 'box power supplies'. Arc loads consist of some 30--40 magnets in series. Transport channel, path length control doglegs and septa box power supplies have loads ranging from 1 to 10 magnets. Shunts are installed on virtually all loads where two or more magnets are in series. At this time, 95% of the power supplies are installed and commissioned. In the past twelve months, beginning in May 1994, approximately 1200 trim magnet power supplies have been checked out. During this same period approximately 22 box power supplies and 100 shunts have been made operational. Full operation of the equipment has only been under way since early 1995. While this operation is only just beginning, much has been learned based on the reliability performance seen so far. The remainder of this paper describes the systems mentioned, their reliability problems, the fixes implemented to date, and some plans for the future. 6 refs., 3 tabs

  11. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  12. Inter-operator and inter-device agreement and reliability of the SEM Scanner.

    Science.gov (United States)

    Clendenin, Marta; Jaradeh, Kindah; Shamirian, Anasheh; Rhodes, Shannon L

    2015-02-01

    The SEM Scanner is a medical device designed for use by healthcare providers as part of pressure ulcer prevention programs. The objective of this study was to evaluate the inter-rater and inter-device agreement and reliability of the SEM Scanner. Thirty-one (31) volunteers free of pressure ulcers or broken skin at the sternum, sacrum, and heels were assessed with the SEM Scanner. Each of three operators utilized each of three devices to collect readings from four anatomical sites (sternum, sacrum, left and right heels) on each subject for a total of 108 readings per subject collected over approximately 30 min. For each combination of operator-device-anatomical site, three SEM readings were collected. Inter-operator and inter-device agreement and reliability were estimated. Over the course of this study, more than 3000 SEM Scanner readings were collected. Agreement between operators was good with mean differences ranging from -0.01 to 0.11. Inter-operator and inter-device reliability exceeded 0.80 at all anatomical sites assessed. The results of this study demonstrate the high reliability and good agreement of the SEM Scanner across different operators and different devices. Given the limitations of current methods to prevent and detect pressure ulcers, the SEM Scanner shows promise as an objective, reliable tool for assessing the presence or absence of pressure-induced tissue damage such as pressure ulcers. Copyright © 2015 Bruin Biometrics, LLC. Published by Elsevier Ltd.. All rights reserved.

  13. Towards Reliable Evaluation of Anomaly-Based Intrusion Detection Performance

    Science.gov (United States)

    Viswanathan, Arun

    2012-01-01

    This report describes the results of research into the effects of environment-induced noise on the evaluation process for anomaly detectors in the cyber security domain. This research was conducted during a 10-week summer internship program from the 19th of August, 2012 to the 23rd of August, 2012 at the Jet Propulsion Laboratory in Pasadena, California. The research performed lies within the larger context of the Los Angeles Department of Water and Power (LADWP) Smart Grid cyber security project, a Department of Energy (DoE) funded effort involving the Jet Propulsion Laboratory, California Institute of Technology and the University of Southern California/ Information Sciences Institute. The results of the present effort constitute an important contribution towards building more rigorous evaluation paradigms for anomaly-based intrusion detectors in complex cyber physical systems such as the Smart Grid. Anomaly detection is a key strategy for cyber intrusion detection and operates by identifying deviations from profiles of nominal behavior and are thus conceptually appealing for detecting "novel" attacks. Evaluating the performance of such a detector requires assessing: (a) how well it captures the model of nominal behavior, and (b) how well it detects attacks (deviations from normality). Current evaluation methods produce results that give insufficient insight into the operation of a detector, inevitably resulting in a significantly poor characterization of a detectors performance. In this work, we first describe a preliminary taxonomy of key evaluation constructs that are necessary for establishing rigor in the evaluation regime of an anomaly detector. We then focus on clarifying the impact of the operational environment on the manifestation of attacks in monitored data. We show how dynamic and evolving environments can introduce high variability into the data stream perturbing detector performance. Prior research has focused on understanding the impact of this

  14. SRC: FenixOS - A Research Operating System Focused on High Scalability and Reliability

    DEFF Research Database (Denmark)

    Passas, Stavros; Karlsson, Sven

    2011-01-01

    Computer systems keep increasing in size. Systems scale in the number of processing units, memories and peripheral devices. This creates many and diverse architectural trade-offs that the existing operating systems are not able to address. We are designing and implementing, FenixOS, a new operating...... of the operating system....... system that aims to improve the state of the art in scalability and reliability. We achieve scalability through limiting data sharing when possible, and through extensive use of lock-free data structures. Reliability is addressed with a careful re-design of the programming interface and structure...

  15. Monitoring of operational reliability of safety-related I and C subsystems at the Dukovany NPP

    International Nuclear Information System (INIS)

    Fuchs, P.; Sagl, P.; Zlamal, P.

    2007-01-01

    First, the situation existing in the data base in 1999, i.e. before the monitoring and the operational reliability monitoring concept were introduced, is highlighted. The technique of data processing is described with focus on the assessment of the relevancy of the records, component failure rate monitoring, estimation of basic statistical parameters, evaluation of the feasibility of component failure (or failure latency) detection, assessment of the mean time to repair, FMEA of the basic components (relays end measuring chains) to establish spurious signals and dangerous failure ratio. The reliability assessment of the system functions is based on structural reliability calculations (common cause failures not included). The outcomes from the operational reliability monitoring are presented in the form of a representative set of data, graphic charts and results of system function reliability assessment. Prospects for upgrading the I and C operational reliability monitoring system to the benefit of NPP Dukovany operating economy (life cycle costs evaluation, spare parts planning, RCM application) are outlined. (author)

  16. The ATLAS Semiconductor Tracker: operations and performance

    CERN Document Server

    Pani, P; The ATLAS collaboration

    2013-01-01

    After more than 3 years of successful operation at 2 the LHC, we report on the operation and performance of the Semi-Conductor Tracker (SCT) functioning in a high luminosity, 4 high radiation environment. The SCT is part of the inner tracking system of the ATLAS 6 experiment at CERN and is constructed of 4088 silicon detector modules for a total of 6.3 million strips. We find 99.3% of the 8 SCT modules are operational, noise occupancy and hit efficiency exceed the design specifications; the alignment is very close to 10 the ideal to allow on-line track reconstruction and invariant mass determination. We will report on the operation and performance 12 of the detector including an overview of the issues encountered. The observables employed to monitor online and offline the 14 quality and the performance of the data acquired by the SCT will be described and discussed.

  17. Methodology for risk assessment and reliability applied for pipeline engineering design and industrial valves operation

    Energy Technology Data Exchange (ETDEWEB)

    Silveira, Dierci [Universidade Federal Fluminense (UFF), Volta Redonda, RJ (Brazil). Escola de Engenharia Industrial e Metalurgia. Lab. de Sistemas de Producao e Petroleo e Gas], e-mail: dsilveira@metal.eeimvr.uff.br; Batista, Fabiano [CICERO, Rio das Ostras, RJ (Brazil)

    2009-07-01

    Two kinds of situations may be distinguished for estimating the operating reliability when maneuvering industrial valves and the probability of undesired events in pipelines and industrial plants: situations in which the risk is identified in repetitive cycles of operations and situations in which there is a permanent hazard due to project configurations introduced by decisions during the engineering design definition stage. The estimation of reliability based on the influence of design options requires the choice of a numerical index, which may include a composite of human operating parameters based on biomechanics and ergonomics data. We first consider the design conditions under which the plant or pipeline operator reliability concepts can be applied when operating industrial valves, and then describe in details the ergonomics and biomechanics risks that would lend itself to engineering design database development and human reliability modeling and assessment. This engineering design database development and reliability modeling is based on a group of engineering design and biomechanics parameters likely to lead to over-exertion forces and working postures, which are themselves associated with the functioning of a particular plant or pipeline. This approach to construct based on ergonomics and biomechanics for a more common industrial valve positioning in the plant layout is proposed through the development of a methodology to assess physical efforts and operator reach, combining various elementary operations situations. These procedures can be combined with the genetic algorithm modeling and four elements of the man-machine systems: the individual, the task, the machinery and the environment. The proposed methodology should be viewed not as competing to traditional reliability and risk assessment bur rather as complementary, since it provides parameters related to physical efforts values for valves operation and workspace design and usability. (author)

  18. Application of objective clinical human reliability analysis (OCHRA) in assessment of technical performance in laparoscopic rectal cancer surgery.

    Science.gov (United States)

    Foster, J D; Miskovic, D; Allison, A S; Conti, J A; Ockrim, J; Cooper, E J; Hanna, G B; Francis, N K

    2016-06-01

    Laparoscopic rectal resection is technically challenging, with outcomes dependent upon technical performance. No robust objective assessment tool exists for laparoscopic rectal resection surgery. This study aimed to investigate the application of the objective clinical human reliability analysis (OCHRA) technique for assessing technical performance of laparoscopic rectal surgery and explore the validity and reliability of this technique. Laparoscopic rectal cancer resection operations were described in the format of a hierarchical task analysis. Potential technical errors were defined. The OCHRA technique was used to identify technical errors enacted in videos of twenty consecutive laparoscopic rectal cancer resection operations from a single site. The procedural task, spatial location, and circumstances of all identified errors were logged. Clinical validity was assessed through correlation with clinical outcomes; reliability was assessed by test-retest. A total of 335 execution errors identified, with a median 15 per operation. More errors were observed during pelvic tasks compared with abdominal tasks (p technical performance of laparoscopic rectal surgery.

  19. Steam generator thermal hydraulic design & functional architecture features and related operational and reliability issues requiring consideration

    International Nuclear Information System (INIS)

    Klarner, R.G.

    2012-01-01

    Proper thermal hydraulic design and functional architecture are critical to successful steam generator operation and long term reliability. The evolution of steam generators has been a gradual learning process that has benefited from continuous industry operational experience (OPEX). Inadequate thermal hydraulic design can lead to numerous degradation mechanisms such as excessive deposition, corrosion, flow and level instabilities, fluid-elastic instabilities and tube wear. The functional architecture determines the health of the tube bundle and the other internals during manufacturing, handling and operation. It also determines thermal performance as well as establishing global thermal-hydraulic characteristics such as water level shrink and swell response. This paper discusses the range of operational and reliability issues and relates them to the thermal hydraulic attributes and functional architecture of steam generators (many SG reliability issues are further discussed in other presentations at this conference). In pursuing such issues, the paper focuses on the four major features of the equipment, identifying in each case the goals and requirements such features must meet. Typical approaches and the means by which such requirements are addressed in current equipment are discussed. The four features are: 1. Tubing Material and Tube Bundle Heat Transfer Performance; a. Two materials are in current use – Alloy 690 TT and Alloy 800. Both are good materials with excellent performance records which serve their owners very well (the reliability attributes of Alloy 800 and 690 are discussed in other papers at this conference). Caution is advised in the supply of any material: – material quality is only assured by what is specified to material suppliers in procurement specifications – i.e. - all the knowledge and research in the world assures nothing if its findings are not reflected in procurement requirements. b. Heat transfer performance in addition to being

  20. Some human performance paradoxes of nuclear operations

    International Nuclear Information System (INIS)

    Otway, H.J.; Misenta, R.

    1980-01-01

    Roughly once a year, an abnormal situation with emergency potential may suddenly break the calm monotony of nuclear-power plant operation. The operating crew, perhaps under-stimulated by monitoring largely automatic processes, may then be expected to make correct inferences and decisions about complex phenomena. However, under stress, the operators may resort to using their 'best-learned responses', inappropriate to the real situation. Recent events at Three Mile Island prompted a variety of suggestions intended to improve operator performance, eg higher qualifications, more pay, or enhanced status. The authors stress the paradoxes of nuclear operation, conclude that some 'intuitively obvious' suggestions might have the opposite effect to that intended, and explore the possibility of introducing frequent, realistic emergency drills. Even this approach raises paradoxes - perhaps the role of the operator should be eliminated, or redefined to allow less human intervention in emergencies. (author)

  1. Reliability of high-voltage pulse capacitors operating in large energy storages

    International Nuclear Information System (INIS)

    Kuchinskij, G.S.; Fedorova, V.S.; Shilin, O.V.

    1982-01-01

    To improve the reliability of pulse capacitors operating in capacitive energy storages, processes, resulting in break-down of capacitor insulation were investigated. A statistic model of failures was constructed and reliability of real capacitors, functioning at operating electric intensity Usub(oper) equal 70 kV/mm and at elevated intensity 90 kV/mm was calculated. Results of testing the IK50-ZU4 capacitor are given. The form of the capacitor service life distribution function was specified. To provide and confirm the assigned capacitor reliability, it is necessary to speed up tests at a higher voltage (1.3-1.5) Usub(oper). To improve the capacitor reliability, it is advisable to conduct acceptance tests, which include hold at increased constant voltage (1.3-1.5) Usub(oper) during 1-3 min and the effect of pulses of increased voltage (1.2-1.3) Usub(oper) with the pulse shape corresponding to operating conditions

  2. Performing an allreduce operation using shared memory

    Science.gov (United States)

    Archer, Charles J [Rochester, MN; Dozsa, Gabor [Ardsley, NY; Ratterman, Joseph D [Rochester, MN; Smith, Brian E [Rochester, MN

    2012-04-17

    Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

  3. Impact of scaling on the performance and reliability degradation of metal-contacts in NEMS devices

    KAUST Repository

    Dadgour, Hamed F.

    2011-04-01

    Nano-electro-mechanical switches (NEMS) offer new possibilities for the design of ultra energy-efficient systems; however, thus far, all the fabricated NEMS devices require high supply voltages that limit their applicability for logic designs. Therefore, research is being conducted to lower the operating voltages by scaling down the physical dimensions of these devices. However, the impact of device scaling on the electrical and mechanical properties of metal contacts in NEMS devices has not been thoroughly investigated in the literature. Such a study is essential because metal contacts play a critical role in determining the overall performance and reliability of NEMS. Therefore, the comprehensive analytical study presented in this paper highlights the performance and reliability degradations of such metal contacts caused by scaling. The proposed modeling environment accurately takes into account the impact of roughness of contact surfaces, elastic/plastic deformation of contacting asperities, and various inter-molecular forces between mating surfaces (such as Van der Waals and capillary forces). The modeling results are validated and calibrated using available measurement data. This scaling analysis indicates that the key contact properties of gold contacts (resistance, stiction and wear-out) deteriorate "exponentially" with scaling. Simulation results demonstrate that reliable (stiction-free) operation of very small contact areas (≈ 6nm x 6nm) will be a daunting task due to the existence of strong surface forces. Hence, contact degradation is identified as a major problem to the scaling of NEMS transistors. © 2011 IEEE.

  4. Performance management for nuclear power plant operators

    International Nuclear Information System (INIS)

    Fan Pengfei

    2014-01-01

    Fuel was loaded to Unit 3 of the second power plant in May 2010. The Second Operation Division stepped in the operation stage from production preparation and commissioning and exploration of performance management was started. By means of performance evaluation, a closed loop of performance management was formed, staff enthusiasm improved, and potential capability inspired through evaluation, analysis and improvement. The performance evaluation covers attitude, skill, efficiency, performance, teamwork sense, cooperation, etc. Quantitative appraisal was carried out through 31 objective indicators of the working process and results. According to the evaluation results and personal interviews, indicators were modified. Through the performance evaluation, positive guidance is provided to the employees to promote the development of employees, departments and the enterprise. (authors)

  5. Study on the identification of main drivers affecting the performance of human operators during low power and shutdown operation

    International Nuclear Information System (INIS)

    Kim, Ar Ryum; Park, Jinkyun; Kim, Ji Tae; Kim, Jaewhan; Seong, Poong Hyun

    2016-01-01

    Highlights: • The performance of human operator during LPSD operation is significantly important. • Human performance is affected by drivers such as procedure, training, and etc. • Main drivers during LPSD operation at domestic NPPs were suggested. • It is expected that it will be used for estimating human reliability during LPSD operation. - Abstract: In the past, many researchers believed that a reactor during low power and shutdown operation was sufficiently safe. This belief has been changed by the number of accidents during such types of operation, which is significantly high. Also, it was pointed out that one of the main differences between low power and shutdown operation and full power operation is the significance of human action because there are huge amounts of human actions due to extensive maintenance and testing while automatic control and safety functions may be disabled and procedures are insufficient or incomplete. This paper suggests the main drivers in performing human reliability analysis. For this study, we reviewed eight reports relating to human performance during low power and shutdown operation and applied a root cause analysis method for 53 human or human-related events at domestic nuclear power plants to derive the main drivers that affect the occurrence of those events. As a result, several main drivers were derived, such as procedures, training, experience of personnel, and workload/stress. It is expected that these main drivers will be used to perform human reliability analysis for low power and shutdown operation.

  6. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  7. Operational safety system reliability. Progress report, November 15, 1975--May 14, 1976

    International Nuclear Information System (INIS)

    Hockenbury, R.W.; Yeater, M.L.

    1976-05-01

    The report describes the objectives and present status of a study concerning the operational reliability of nuclear power plants. The purpose of the study is to develop utilitarian models for use with the Liquid-Metal-Cooled Fast Breeder Reactor; initial testing of the formalism can be carried out with LWR operational data. Methods are being directed towards (1) day-to-day operation of the nuclear plant protection system and (2) to better understand the protection system sensor characteristics in order to anticipate off-normal conditions. The initial models now underway are based on moment-matching, confidence bounding, and convolution methods in the case of the protection system reliability, and for the sensor response function, a convolution of component reliability probability distributions and noise signatures

  8. ITER parametric analysis and operational performance

    International Nuclear Information System (INIS)

    Perkins, L.J.; Spears, W.R.; Galambos, J.D.

    1991-01-01

    One of the key components of the ITER Conceptual Design Activities (CDA) is the determination of optimum design, investigation of operation in various modes, recommendation of baseline performance specifications, studies of sensitivity of ITER design to uncertainties in physics, investigation of operational flexibility, assessment of alternative designs, and determination of implications for extrapolation to prospective DEMO reactors. These terms of reference are reported in this document. Refs, figs and tabs

  9. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Nagai, K; The ATLAS collaboration

    2012-01-01

    The Semi-Conductor Tracker (SCT) is one of the key precision tracking devices in the ATLAS experiment at CERN Large Hadron Collider (LHC). The SCT was constructed of 4088 modules for a total of 6.3 million silicon strips and was installed into the ATLAS experiment in 2007. The SCT has been fully operational since then, and achieves a good tracking performance from the startup of the LHC operation.

  10. Quantification of the reliability of personnel actions from the evaluation of actual German operational experience. Final report

    International Nuclear Information System (INIS)

    Preischl, W.; Fassmann, W.

    2013-07-01

    The results and their uncertainty bounds of PSA studies are considerably impacted by the assessment of human reliability. But the amount of available, generic data is not sufficient to evaluate all human actions considered in a modern PSA study adequately. Further the data are not sufficiently validated and rely as well as the proposed uncertainty bounds on expert judgement. This research project as well as the preceding project /GRS 10/ validated data recommended by the German PSA Guidelines and enlarged the amount of available data. The findings may contribute to an update of the German PSA Guidelines. In a first step of the project information about reportable events in German nuclear power plants with observed human errors (event reports, expert statements, technical documents, interviews and plant walk downs with subject matter experts from the plants) were analysed. The investigation resulted in 67 samples describing personal activities, performance conditions, the number of observed errors and the number of action performance. In a second step a new methodology was developed and applied in a pilot plant. The objective was to identify undoubtedly error free safety relevant actions, their performance conditions, and frequency as well as to prove and demonstrate that probabilistic data can be derived from that operational experience (OE). The application in the pilot plant resulted in 18 ''error free'' samples characterizing human reliability. All available samples were evaluated by use of the method of Bayes. That commonly accepted methodology was applied in order to derive probabilistic data based on samples taken from operational experience. A thorough analysis of the obtained results shows that both data sources (OE reportable events, OE with undoubtedly error free action performance) provide data with comparable quality and validity. At the end of the research project the following products are available. - Methods to select samples

  11. Understanding organic photovoltaic cells: Electrode, nanostructure, reliability, and performance

    Science.gov (United States)

    Kim, Myung-Su

    My Ph.D. research has focused on alternative renewable energy using organic semiconductors. During my study, first, I have established reliable characterization methods of organic photovoltaic devices. More specifically, less than 5% variation of power conversion efficiency of fabricated organic blend photovoltaic cells (OBPC) was achieved after optimization. The reproducibility of organic photovoltaic cell performance is one of the essential issues that must be clarified before beginning serious investigations of the application of creative and challenging ideas. Second, the relationships between fill factor (FF) and process variables have been demonstrated with series and shunt resistance, and this provided a chance to understand the electrical device behavior. In the blend layer, series resistance (Rs) and shunt resistance (Rsh) were varied by controlling the morphology of the blend layer, the regioregularity of the conjugated polymer, and the thickness of the blend layer. At the interface between the cathode including PEDOT:PSS and the blend layer, cathode conductivity was controlled by varying the structure of the cathode or adding an additive. Third, we thoroughly examined possible characterization mistakes in OPVC. One significant characterization mistake is observed when the crossbar electrode geometry of OPVC using PEDOT:PSS was fabricated and characterized with illumination which is larger than the actual device area. The hypothesis to explain this overestimation was excess photo-current generated from the cell region outside the overlapped electrode area, where PEDOT:PSS plays as anode and this was clearly supported with investigations. Finally, I incorporated a creative idea, which enhances the exciton dissociation efficiency by increasing the interface area between donor and acceptor to improve the power conversion efficiency of organic photovoltaic cells. To achieve this, nanoimprint lithography was applied for interface area increase. To clarify the

  12. Integrated Life Cycle Management: A Strategy for Plants to Extend Operating Lifetimes Safely with High Operational Reliability

    International Nuclear Information System (INIS)

    Esselman, Thomas; Bruck, Paul; Mengers, Charles

    2012-01-01

    Nuclear plant operators are studying the possibility of extending their existing generating facilities operating lifetime to 60 years and beyond. Many nuclear plants have been granted licenses to operate their facilities beyond the original 40 year term; however, in order to optimize the long term operating strategies, plant decision-makers need a consistent approach to support their options. This paper proposes a standard methodology to support effective decision-making for the long-term management of selected station assets. Methods detailed are intended to be used by nuclear plant site management, equipment reliability personnel, long term planners, capital asset planners, license renewal staff, and others that intend to look at operation between the current time and the end of operation. This methodology, named Integrated Life Cycle Management (ILCM), will provide a technical basis to assist decision makers regarding the timing of large capital investments required to get to the end of operation safely and with high plant reliability. ILCM seeks to identify end of life cycle failure probabilities for individual plant large capital assets and attendant costs associated with their refurbishment or replacement. It will provide a standard basis for evaluation of replacement and refurbishment options for these components. ILCM will also develop methods to integrate the individual assets over the entire plant thus assisting nuclear plant decision-makers in their facility long term operating strategies. (author)

  13. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Yamada, M; The ATLAS collaboration

    2011-01-01

    The SemiConductor Tracker (SCT), comprising of silicon micro-strip detectors is one of the key precision tracking devices in the ATLAS Inner Detector. ATLAS is one of the experiments at CERN LHC. The completed SCT is in very good shapes with 99.3% of the SCT’s 4088 modules (a total of 6.3 million strips) are operational. The noise occupancy and hit efficiency exceed the design specifications. In the talk the current status of the SCT will be reviewed. We will report on the operation of the detector, its performance and observed problems, with stress on the sensor and electronics performance.

  14. Good performance in Japan is proof of continuing safety and reliability improvement practice

    International Nuclear Information System (INIS)

    Sumi, Y.

    1987-01-01

    Nuclear power is a vital energy supply source for both security and economy for such countries as Japan whose sources of energy are dependent on imported materials. This is the very reason why Japan gives her national priority to the improvement of nuclear power safety and reliability. As of the end of 1986, total nuclear power capacity owned and operated by private utility companies in Japan amounted to 24521 MW with 32 units sharing -- 19% of the total generating capacity. Moreover, during 1986 these units scored a remarkably high capacity factor of 76.2% and shared almost 28% of the nationwide electric power production, thereby contributing to a considerable saving of imported sources of energy. This outstanding record has been achieved by the parties concerned who dedicated themselves to furthering nuclear plant safety and reliability improvement. In this connection, this paper summarizes those key factors contributing to the good nuclear power plant performance of the Kansai Electric Power Company

  15. Performance and Reliability of Bonded Interfaces for High-temperature Packaging: Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    DeVoto, Douglas J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-10-19

    As maximum device temperatures approach 200 °Celsius, continuous operation, sintered silver materials promise to maintain bonds at these high temperatures without excessive degradation rates. A detailed characterization of the thermal performance and reliability of sintered silver materials and processes has been initiated for the next year. Future steps in crack modeling include efforts to simulate crack propagation directly using the extended finite element method (X-FEM), a numerical technique that uses the partition of unity method for modeling discontinuities such as cracks in a system.

  16. Reliable and valid assessment of performance in thoracoscopy

    DEFF Research Database (Denmark)

    Konge, Lars; Lehnert, Per; Hansen, Henrik Jessen

    2012-01-01

    BACKGROUND: As we move toward competency-based education in medicine, we have lagged in developing competency-based evaluation methods. In the era of minimally invasive surgery, there is a need for a reliable and valid tool dedicated to measure competence in video-assisted thoracoscopic surgery....... The purpose of this study is to create such an assessment tool, and to explore its reliability and validity. METHODS: An expert group of physicians created an assessment tool consisting of 10 items rated on a five-point rating scale. The following factors were included: economy and confidence of movement...

  17. Stress, performance, and control room operations

    International Nuclear Information System (INIS)

    Fontaine, C.W.

    1990-01-01

    The notion of control room operator performance being detrimentally affected by stress has long been the focus of considerable conjecture. It is important to gain a better understanding of the validity of this concern for the development of effective severe-accident management approaches. This paper illustrates the undeniable negative impact of stress on a wide variety of tasks. A computer-controlled simulated work environment was designed in which both male and female operators were closely monitored during the course of the study for both stress level (using the excretion of the urine catecholamines epinephrine and norepinephrine as an index) and job performance. The experimental parameters employed by the study when coupled with the subsequent statistical analyses of the results allow one to make some rather striking comments with respect to how a given operator might respond to a situation that he or she perceives to be psychologically stressful (whether the stress be externally or internally generated). The findings of this study clearly indicated that stress does impact operator performance on tasks similar in nature to those conducted by control room operators and hence should be seriously considered in the development of severe-accident management strategies

  18. Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik; Gao, Wenzhong

    2015-10-27

    The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increased variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.

  19. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development

  20. Performing process migration with allreduce operations

    Science.gov (United States)

    Archer, Charles Jens; Peters, Amanda; Wallenfelt, Brian Paul

    2010-12-14

    Compute nodes perform allreduce operations that swap processes at nodes. A first allreduce operation generates a first result and uses a first process from a first compute node, a second process from a second compute node, and zeros from other compute nodes. The first compute node replaces the first process with the first result. A second allreduce operation generates a second result and uses the first result from the first compute node, the second process from the second compute node, and zeros from others. The second compute node replaces the second process with the second result, which is the first process. A third allreduce operation generates a third result and uses the first result from first compute node, the second result from the second compute node, and zeros from others. The first compute node replaces the first result with the third result, which is the second process.

  1. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Rosendahl, P L; The ATLAS collaboration

    2012-01-01

    The Semi-Conductor Tracker (SCT) is a silicon microstrip detector part of the ATLAS experiment at the CERN Large Hadron Collider (LHC). Together with the rest for the ATLAS Inner Detector (ID) it provides vital precision tracking information of charged particles. In this paper the performance and operational status of the SCT in the last two years of ATLAS data taking are reviewed.

  2. A practical model for sustainable operational performance

    International Nuclear Information System (INIS)

    Vlek, C.A.J.; Steg, E.M.; Feenstra, D.; Gerbens-Leenis, W.; Lindenberg, S.; Moll, H.; Schoot Uiterkamp, A.; Sijtsma, F.; Van Witteloostuijn, A.

    2002-01-01

    By means of a concrete model for sustainable operational performance enterprises can report uniformly on the sustainability of their contributions to the economy, welfare and the environment. The development and design of a three-dimensional monitoring system is presented and discussed [nl

  3. Toward feasible, valid, and reliable video-based assessments of technical surgical skills in the operating room

    DEFF Research Database (Denmark)

    Aggarwal, R.; Grantcharov, T.; Moorthy, K.

    2008-01-01

    .72). Conclusions: Video-based technical skills evaluation in the operating room is feasible, valid and reliable. Global rating scales hold promise for summative assessment, though further work is necessary to elucidate the value of procedural rating scales Udgivelsesdato: 2008/2......Objective: To determine the feasibility, validity, inter-rater, and intertest reliability of 4 previously published video-based rating scales, for technical skills assessment on a benchmark laparoscopic procedure. Summary Background Data: Assessment of technical skills is crucial...... to the demonstration and maintenance of competent healthcare practitioners. Traditional assessment methods are prone to subjectivity through a lack of proven validity and reliability. Methods: Nineteen surgeons (6 novice and 13 experienced) performed a median of 2 laparoscopic cholecystectomies each (range 1-5) on 53...

  4. Reliability of magnetic particle inspection performed through coatings: Final report

    International Nuclear Information System (INIS)

    1988-07-01

    The magnetic particle examination (MT) technique can reliably examine containment welds without removing their protective coatings. This study has investigated a variety of MT methods used in the oil and gas industry for their suitability for nuclear plant applications. 102 figs

  5. Reliability and performance experience with flat-plate photovoltaic modules

    Science.gov (United States)

    Ross, R. G., Jr.

    1982-01-01

    Statistical models developed to define the most likely sources of photovoltaic (PV) array failures and the optimum method of allowing for the defects in order to achieve a 20 yr lifetime with acceptable performance degradation are summarized. Significant parameters were the cost of energy, annual power output, initial cost, replacement cost, rate of module replacement, the discount rate, and the plant lifetime. Acceptable degradation allocations were calculated to be 0.0001 cell failures/yr, 0.005 module failures/yr, 0.05 power loss/yr, a 0.01 rate of power loss/yr, and a 25 yr module wear-out length. Circuit redundancy techniques were determined to offset cell failures using fault tolerant designs such as series/parallel and bypass diode arrangements. Screening processes have been devised to eliminate cells that will crack in operation, and multiple electrical contacts at each cell compensate for the cells which escape the screening test and then crack when installed. The 20 yr array lifetime is expected to be achieved in the near-term.

  6. New application of dynamic reliability assessment of the mid-loop operation

    International Nuclear Information System (INIS)

    Moosung, Jae; Goon Cherl Park; Chang Hyun Chung

    1995-01-01

    This paper presents a new approach for assessing the dynamic reliability in a complex system such as a nuclear power plant. The method is applied to a dynamic analysis of the potential accident sequences that may occur during mid-loop operation

  7. Power system reliability impacts of wind generation and operational reserve requirements

    Directory of Open Access Journals (Sweden)

    Esteban Gil

    2015-06-01

    Full Text Available Due to its variability, wind generation integration presents a significant challenge to power system operators in order to maintain adequate reliability levels while ensuring least cost operation. This paper explores the trade-off between the benefits associated to a higher wind penetration and the additional operational reserve requirements that they impose. Such exploration is valued in terms of its effect on power system reliability, measured as an amount of unserved energy. The paper also focuses on how changing the Value of Lost Load (VoLL can be used to attain different reliability targets, and how wind power penetration and the diversity of the wind energy resource will impact quality of supply (in terms of instances of unserved energy. The evaluation of different penetrations of wind power generation, different wind speed profiles, wind resource diversity, and different operational reserve requirements, is conducted on the Chilean Northern Interconnected System (SING using statistical modeling of wind speed time series and computer simulation through a 24-hour ahead unit commitment algorithm and a Monte Carlo simulation scheme. Results for the SING suggest that while wind generation can significantly reduce generation costs, it can also imply higher security costs to reach acceptable reliability levels.

  8. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and risk-based approach is presented where a life-cycle approach...

  9. Use of eye tracking equipment for human reliability analysis applied to complex system operations

    International Nuclear Information System (INIS)

    Pinheiro, Andre Ricardo Mendonça; Prado, Eugenio Anselmo Pessoa do; Martins, Marcelo Ramos

    2017-01-01

    This article will discuss the preliminary results of an evaluation methodology for the analysis and quantification of manual character errors (human), by monitoring cognitive parameters and skill levels in the operation of a complex control system based on parameters provided by a eye monitoring equipment (Eye Tracker). The research was conducted using a simulator (game) that plays concepts of operation of a nuclear reactor with a split sample for evaluation of aspects of learning, knowledge and standard operating within the context addressed. bridge operators were monitored using the EYE TRACKING, eliminating the presence of the analyst in the evaluation of the operation, allowing the analysis of the results by means of multivariate statistical techniques within the scope of system reliability. The experiments aim to observe state change situations such as stops and scheduled departures, incidents assumptions and common operating characteristics. Preliminary results of this research object indicate that technical and cognitive aspects can contribute to improving the reliability of the available techniques in human reliability, making them more realistic both in the context of quantitative approaches to regulatory and training purposes, as well as reduced incidence of human error. (author)

  10. Use of eye tracking equipment for human reliability analysis applied to complex system operations

    Energy Technology Data Exchange (ETDEWEB)

    Pinheiro, Andre Ricardo Mendonça; Prado, Eugenio Anselmo Pessoa do; Martins, Marcelo Ramos, E-mail: andrericardopinheiro@usp.br, E-mail: eugenio.prado@labrisco.usp.br, E-mail: mrmatins@usp.br [Universidade de Sao Paulo (LABRISCO/USP), Sao Paulo, SP (Brazil). Lab. de Análise, Avaliação e Gerenciamento de Risco

    2017-07-01

    This article will discuss the preliminary results of an evaluation methodology for the analysis and quantification of manual character errors (human), by monitoring cognitive parameters and skill levels in the operation of a complex control system based on parameters provided by a eye monitoring equipment (Eye Tracker). The research was conducted using a simulator (game) that plays concepts of operation of a nuclear reactor with a split sample for evaluation of aspects of learning, knowledge and standard operating within the context addressed. bridge operators were monitored using the EYE TRACKING, eliminating the presence of the analyst in the evaluation of the operation, allowing the analysis of the results by means of multivariate statistical techniques within the scope of system reliability. The experiments aim to observe state change situations such as stops and scheduled departures, incidents assumptions and common operating characteristics. Preliminary results of this research object indicate that technical and cognitive aspects can contribute to improving the reliability of the available techniques in human reliability, making them more realistic both in the context of quantitative approaches to regulatory and training purposes, as well as reduced incidence of human error. (author)

  11. The effect of specialization on operational performance

    DEFF Research Database (Denmark)

    Halkjær, Søren; Lueg, Rainer

    2017-01-01

    -methods approach that includes proprietary data from the management control system of the hospital, public documentation on the policy change, as well as interviews with key informants. These data suggest that operational deficiency is related to the fact that specialization was externally enforced through......Purpose - The purpose of this paper is to analyze how specialization in hospitals affects operational performance, measured by the length of stay and readmission rate. The authors assess a public policy change in the Danish healthcare sector from 2011 which required that some hospital services had...

  12. Reliable High Performance Processing System (RHPPS), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's exploration, science, and space operations systems are critically dependent on the hardware technologies used in their implementation. Specifically, the...

  13. Reliable High Performance Processing System (RHPPS), Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's exploration, science, and space operations systems are critically dependent on the hardware technologies used in their implementation. Specifically, the...

  14. Managing wind turbine reliability and maintenance via performance-based contract

    DEFF Research Database (Denmark)

    Jin, Tongdan; Ding, Yi; Guo, Huairui

    2012-01-01

    between system cost, reliability and spare parts stocking. This analytical insight into the system performance allows the turbine manufacturer to optimize design, production, and after-sales services. The study aims to create a theoretical basis to facilitate the transition of the maintenance paradigm......Performance-based contracting (PBC) is reshaping the acquisition, operation, and maintenance of capital equipment. Under the PBC scheme, we propose a holistic approach for lowering the cost of wind turbine ownership while meeting the availability requirement. Our effects are focused on integrated...... firms who design and market wind turbines, and also provide maintenance and repair service. PBC differs from conventional service contracts in that the wind farmers compensate the service provider for the system performance, not the spare parts and repair labor. We explore the analytical relationship...

  15. EFFECT OF LUBRICANT CONTAMINATION ON THE PERFORMANCE AND RELIABILITY OF HEAT PUMPS CHARGED WITH R-407C.

    Science.gov (United States)

    The report gives results of the development of new data that can be used to determine the effect of mineral oil contamination on the reliability of a heat pump system operating with a new hydrofluorocarbon mixture and polyol ester lubricant, to assess any performance degradation ...

  16. The cognitive environment simulation as a tool for modeling human performance and reliability

    International Nuclear Information System (INIS)

    Woods, D.D.; Pople, H. Jr.; Roth, E.M.

    1990-01-01

    The US Nuclear Regulatory Commission is sponsoring a research program to develop improved methods to model the cognitive behavior of nuclear power plant (NPP) personnel. Under this program, a tool for simulating how people form intentions to act in NPP emergency situations was developed using artificial intelligence (AI) techniques. This tool is called Cognitive Environment Simulation (CES). The Cognitive Reliability Assessment Technique (or CREATE) was also developed to specify how CBS can be used to enhance the measurement of the human contribution to risk in probabilistic risk assessment (PRA) studies. The next step in the research program was to evaluate the modeling tool and the method for using the tool for Human Reliability Analysis (HRA) in PRAs. Three evaluation activities were conducted. First, a panel of highly distinguished experts in cognitive modeling, AI, PRA and HRA provided a technical review of the simulation development work. Second, based on panel recommendations, CES was exercised on a family of steam generator tube rupture incidents where empirical data on operator performance already existed. Third, a workshop with HRA practitioners was held to analyze a worked example of the CREATE method to evaluate the role of CES/CREATE in HRA. The results of all three evaluations indicate that CES/CREATE represents a promising approach to modeling operator intention formation during emergency operations

  17. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    Science.gov (United States)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  18. Practical applications of age-dependent reliability models and analysis of operational data

    Energy Technology Data Exchange (ETDEWEB)

    Lannoy, A.; Nitoi, M.; Backstrom, O.; Burgazzi, L.; Couallier, V.; Nikulin, M.; Derode, A.; Rodionov, A.; Atwood, C.; Fradet, F.; Antonov, A.; Berezhnoy, A.; Choi, S.Y.; Starr, F.; Dawson, J.; Palmen, H.; Clerjaud, L

    2005-07-01

    The purpose of the workshop was to present the experience of practical application of time-dependent reliability models. The program of the workshop comprises the following sessions: -) aging management and aging PSA (Probabilistic Safety Assessment), -) modeling, -) operation experience, and -) accelerating aging tests. In order to introduce time aging effect of particular component to the PSA model, it has been proposed to use the constant unavailability values on the short period of time (one year for example) calculated on the basis of age-dependent reliability models. As for modeling, it appears that the problem of too detailed statistical models for application is the lack of data for required parameters. As for operating experience, several methods of operating experience analysis have been presented (algorithms for reliability data elaboration and statistical identification of aging trend). As for accelerated aging tests, it is demonstrated that a combination of operating experience analysis with the results of accelerated aging tests of naturally aged equipment could provide a good basis for continuous operation of instrumentation and control systems.

  19. Practical applications of age-dependent reliability models and analysis of operational data

    International Nuclear Information System (INIS)

    Lannoy, A.; Nitoi, M.; Backstrom, O.; Burgazzi, L.; Couallier, V.; Nikulin, M.; Derode, A.; Rodionov, A.; Atwood, C.; Fradet, F.; Antonov, A.; Berezhnoy, A.; Choi, S.Y.; Starr, F.; Dawson, J.; Palmen, H.; Clerjaud, L.

    2005-01-01

    The purpose of the workshop was to present the experience of practical application of time-dependent reliability models. The program of the workshop comprises the following sessions: -) aging management and aging PSA (Probabilistic Safety Assessment), -) modeling, -) operation experience, and -) accelerating aging tests. In order to introduce time aging effect of particular component to the PSA model, it has been proposed to use the constant unavailability values on the short period of time (one year for example) calculated on the basis of age-dependent reliability models. As for modeling, it appears that the problem of too detailed statistical models for application is the lack of data for required parameters. As for operating experience, several methods of operating experience analysis have been presented (algorithms for reliability data elaboration and statistical identification of aging trend). As for accelerated aging tests, it is demonstrated that a combination of operating experience analysis with the results of accelerated aging tests of naturally aged equipment could provide a good basis for continuous operation of instrumentation and control systems

  20. Reliability analysis and optimisation of subsea compression system facing operational covariate stresses

    International Nuclear Information System (INIS)

    Okaro, Ikenna Anthony; Tao, Longbin

    2016-01-01

    This paper proposes an enhanced Weibull-Corrosion Covariate model for reliability assessment of a system facing operational stresses. The newly developed model is applied to a Subsea Gas Compression System planned for offshore West Africa to predict its reliability index. System technical failure was modelled by developing a Weibull failure model incorporating a physically tested corrosion profile as stress in order to quantify the survival rate of the system under additional operational covariates including marine pH, temperature and pressure. Using Reliability Block Diagrams and enhanced Fusell-Vesely formulations, the whole system was systematically decomposed to sub-systems to analyse the criticality of each component and optimise them. Human reliability was addressed using an enhanced barrier weighting method. A rapid degradation curve is obtained on a subsea system relative to the base case subjected to a time-dependent corrosion stress factor. It reveals that subsea system components failed faster than their Mean time to failure specifications from Offshore Reliability Database as a result of cumulative marine stresses exertion. The case study demonstrated that the reliability of a subsea system can be systematically optimised by modelling the system under higher technical and organisational stresses, prioritising the critical sub-systems and making befitting provisions for redundancy and tolerances. - Highlights: • Novel Weibull Corrosion-Covariate model for reliability analysis of subsea assets. • Predict the accelerated degradation profile of a subsea gas compression. • An enhanced optimisation method based on Fusell-Vesely decomposition process. • New optimisation approach for smoothening of over- and under-designed components. • Demonstrated a significant improvement in producing more realistic failure rate.

  1. Water chemistry - one of the key technologies for safe and reliable nuclear power plant operation

    International Nuclear Information System (INIS)

    Uchida, S.; Otoha, K.; Ishigure, K.

    2006-01-01

    Full text: Full text: Water chemistry control is one of the key technologies to establish safe and reliable operation of nuclear power plants. Continuous and collaborative efforts of plant manufacturers and plant operator utilities have been focused on optimal water chemistry control, for which, a trio of requirements for water chemistry, a) better reliability of reactor structures and fuels, b) lower occupational exposure, and c) fewer radwaste sources, should be simultaneously satisfied. The research committee related to water chemistry of the Atomic Energy Society of Japan has played important roles to enhance improvement in water chemistry control, to share knowledge and experience with water chemistry among plant operators and manufacturers, to establish common technological bases for plant water chemistry and then to transfer them to the next generation related to water chemistry. Furthermore, the committee has tried to contribute to arranging R and D proposals for further improvement in water chemistry control through road map planning

  2. On modeling human reliability in space flights - Redundancy and recovery operations

    Science.gov (United States)

    Aarset, M.; Wright, J. F.

    The reliability of humans is of paramount importance to the safety of space flight systems. This paper describes why 'back-up' operators might not be the best solution, and in some cases, might even degrade system reliability. The problem associated with human redundancy calls for special treatment in reliability analyses. The concept of Standby Redundancy is adopted, and psychological and mathematical models are introduced to improve the way such problems can be estimated and handled. In the past, human reliability has practically been neglected in most reliability analyses, and, when included, the humans have been modeled as a component and treated numerically the way technical components are. This approach is not wrong in itself, but it may lead to systematic errors if too simple analogies from the technical domain are used in the modeling of human behavior. In this paper redundancy in a man-machine system will be addressed. It will be shown how simplification from the technical domain, when applied to human components of a system, may give non-conservative estimates of system reliability.

  3. Evaluating and improving nuclear power plant operating performance

    International Nuclear Information System (INIS)

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world's most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America

  4. Evaluating and improving nuclear power plant operating performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This report aims to provide the basis for improvements in the understanding of nuclear power plants operation and ideas for improving future productivity. The purpose of the project was to identify good practices of operating performance at a few of the world`s most productive plants. This report was prepared through a series of consultants meetings, a specialists meeting and an Advisory Group meeting with participation of experts from 23 Member States. The report is based on self-assessment of half a dozen plants that have been chosen as representatives of different reactor types in as many different countries, and the views and assessment of the participants on good practices influencing plant performance. Three main areas that influence nuclear power plant availability and reliability were identified in the discussions: (1) management practices, (2) personnel characteristics, and (3) working practices. These areas cover causes influencing plant performance under plant management control. In each area the report describes factors or good practices that positively influence plant availability. The case studies, presented in annexes, contain the plant self-assessment of areas that influence their availability and reliability. Six plants are represented in the case studies: (1) Dukovany (WWER, 1760 MW) in the Czech Republic; (2) Blayais (PWR, 3640 MW) in France; (3) Paks (WWER, 1840 MW) in Hungary; (4) Wolsong 1 (PHWR, 600 MW) in the Republic of Korea; (5) Trillo 1 (PWR, 1066 MW) in Spain; and (6) Limerick (BWR, 2220 MW) in the United States of America Figs, tabs

  5. Data collection on the unit control room simulator as a method of operator reliability analysis

    International Nuclear Information System (INIS)

    Holy, J.

    1998-01-01

    The report consists of the following chapters: (1) Probabilistic assessment of nuclear power plant operation safety and human factor reliability analysis; (2) Simulators and simulations as human reliability analysis tools; (3) DOE project for using the collection and analysis of data from the unit control room simulator in human factor reliability analysis at the Paks nuclear power plant; (4) General requirements for the organization of the simulator data collection project; (5) Full-scale simulator at the Nuclear Power Plants Research Institute in Trnava, Slovakia, used as a training means for operators of the Dukovany NPP; (6) Assessment of the feasibility of quantification of important human actions modelled within a PSA study by employing simulator data analysis; (7) Assessment of the feasibility of using the various exercise topics for the quantification of the PSA model; (8) Assessment of the feasibility of employing the simulator in the analysis of the individual factors affecting the operator's activity; and (9) Examples of application of statistical methods in the analysis of the human reliability factor. (P.A.)

  6. High Performance Computing Operations Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Cupps, Kimberly C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-19

    The High Performance Computing Operations Review (HPCOR) meeting—requested by the ASC and ASCR program headquarters at DOE—was held November 5 and 6, 2013, at the Marriott Hotel in San Francisco, CA. The purpose of the review was to discuss the processes and practices for HPC integration and its related software and facilities. Experiences and lessons learned from the most recent systems deployed were covered in order to benefit the deployment of new systems.

  7. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Barone, G; The ATLAS collaboration

    2013-01-01

    The Semi-Conductor Tracker (SCT) is a silicon strip detector and one of the key precision tracking devices of the Inner Detector of the ATLAS experiment at CERN LHC. The SCT is constructed of $4088$ silicon detector modules for a total of 6.3 million channels. Each module is designed, constructed and tested to operate as a stand-alone unit, mechanically, electrically, optically and thermally. The modules are mounted into two types of structures: one barrel ($4$ cylinders) and two end-cap systems (9 disks on each). The current results from the successful operation of the SCT Detector at the LHC and its status after three years of operation will be presented. The operation of the detector including an overview of the main issues encountered is reported. The main emphasis is be given to the tracking performance of the SCT and the data quality during the $>2$ years of data taking of proton-proton collision data at $7$ TeV (and short periods of heavy ion collisions). The SCT has been fully operational throughout a...

  8. Improving Stochastic Communication Network Performance: Reliability vs. Throughput

    Science.gov (United States)

    1991-12-01

    increased to one. 2) arc survivabil.. ities will be increased in increments of one tenths. and 3) the costs to increase- arc si’rvivabilities were equal and...This reliability value is leni used to maximize the associated expected flow. For Net work A. a bIdget of (8)() pro(duces a tradcoff point at (.58.37...Network B for a buidgel of 2000 which allows a nel \\\\ork relial)ilitv of one to be achieved and a bidget of 1200 which allows for ;, maximum 57

  9. Human Performance Modeling for Dynamic Human Reliability Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Boring, Ronald Laurids [Idaho National Laboratory; Joe, Jeffrey Clark [Idaho National Laboratory; Mandelli, Diego [Idaho National Laboratory

    2015-08-01

    Part of the U.S. Department of Energy’s (DOE’s) Light Water Reac- tor Sustainability (LWRS) Program, the Risk-Informed Safety Margin Charac- terization (RISMC) Pathway develops approaches to estimating and managing safety margins. RISMC simulations pair deterministic plant physics models with probabilistic risk models. As human interactions are an essential element of plant risk, it is necessary to integrate human actions into the RISMC risk framework. In this paper, we review simulation based and non simulation based human reliability analysis (HRA) methods. This paper summarizes the founda- tional information needed to develop a feasible approach to modeling human in- teractions in RISMC simulations.

  10. Operation and reliability of a pneumatic hydrogen pellet injection system on the Joint European Torus

    International Nuclear Information System (INIS)

    Combs, S.K.; Jernigan, T.C.; Baylor, L.R.; Milora, S.L.; Foust, C.R.; Kupschus, P.; Gadeberg, M.; Bailey, W.; Commission of the European Communities, Abingdon

    1989-01-01

    A pneumatic-based, hydrogen isotope pellet injector that was developed at the Oak Ridge National Laboratory for the plasma fueling application on the Joint European Torus (JET) was described at the last Symposium on Fusion Engineering (1987). The injector was installed on JET during 1987 and has since been used in plasma fueling experiments. The injector consists of three independent machine-gun-like mechanisms (nominal pellet sizes of 2.7, 4.0, and 6.0 mm in diameter), and it features repetitive operation (1-5 Hz) for quasi-steady-state conditions (>10 s). An extensive set of injector diagnostics permits evaluation of parameters for each pellet shot, including speed, mass, and integrity. Pellet speeds can be varied but typically range from 1.0 to 1.5 km/s. Over 5000 pellets have been fired with the equipment at JET, including about 2000 pellets shot for plasma fueling experiments. In recent experiments, the system performance has been outstanding, including excellent reproducibility in pellet speed and mass and a reliability of >98% in delivery of pellets to the plasma. 7 refs., 5 figs

  11. Effects of extended lay-off periods on performance and operator trust under adaptable automation.

    Science.gov (United States)

    Chavaillaz, Alain; Wastell, David; Sauer, Jürgen

    2016-03-01

    Little is known about the long-term effects of system reliability when operators do not use a system during an extended lay-off period. To examine threats to skill maintenance, 28 participants operated twice a simulation of a complex process control system for 2.5 h, with an 8-month retention interval between sessions. Operators were provided with an adaptable support system, which operated at one of the following reliability levels: 60%, 80% or 100%. Results showed that performance, workload, and trust remained stable at the second testing session, but operators lost self-confidence in their system management abilities. Finally, the effects of system reliability observed at the first testing session were largely found again at the second session. The findings overall suggest that adaptable automation may be a promising means to support operators in maintaining their performance at the second testing session. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  12. The experiences to improve plant performance and reliability of Ko-Ri nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Ho Weon [Korea Electric Power Corp. Ko-Ri nuclear power division, Ko-Ri (Korea, Republic of)

    1998-07-01

    This paper provides a discussion of the lessons learned from operational experience and the future plans to improve performance of the Ko-Ri plant. To operate nuclear power plants safely with good performance is the only way to mitigate the negative image of nuclear power generation to the public and to enhance the economical benefit compared to other electrical generation method. Therefore, in a continuous effort to overcome a negative challenge from outside, we have driven an aggressive 'OCTF' campaign as part of safety. As a result of our efforts, the following remarkable achievements have been accomplished. (1) 3 times of OCTF during recent three years (2) Selected twice as a top notch power plant on the list of NEI magazine in terms of plant capacity factor (3) No scram recorded in 1997 for all 4 units at Ko-Ri site. Ko-Ri is now undergoing the large scale plant betterment projects for retaking-off our operating performance to the level of new challenge target. Such improvement of critical components in the reactor coolant system and turbine system greatly contribute to increase the safety and reliability of the plant and to shortening of the planned outage period as well as to reduction of radiation exposure and radwaste. (Cho, G. S.). 5 tabs., 10 figs.

  13. The experiences to improve plant performance and reliability of Ko-Ri nuclear power plants

    International Nuclear Information System (INIS)

    Kang, Ho Weon

    1998-01-01

    This paper provides a discussion of the lessons learned from operational experience and the future plans to improve performance of the Ko-Ri plant. To operate nuclear power plants safely with good performance is the only way to mitigate the negative image of nuclear power generation to the public and to enhance the economical benefit compared to other electrical generation method. Therefore, in a continuous effort to overcome a negative challenge from outside, we have driven an aggressive 'OCTF' campaign as part of safety. As a result of our efforts, the following remarkable achievements have been accomplished. (1) 3 times of OCTF during recent three years (2) Selected twice as a top notch power plant on the list of NEI magazine in terms of plant capacity factor (3) No scram recorded in 1997 for all 4 units at Ko-Ri site. Ko-Ri is now undergoing the large scale plant betterment projects for retaking-off our operating performance to the level of new challenge target. Such improvement of critical components in the reactor coolant system and turbine system greatly contribute to increase the safety and reliability of the plant and to shortening of the planned outage period as well as to reduction of radiation exposure and radwaste. (Cho, G. S.). 5 tabs., 10 figs

  14. Operating experience and reliability improvements on the 5 kW CW klystron at Jefferson Lab

    International Nuclear Information System (INIS)

    Nelson, R.; Holben, S.

    1997-01-01

    With substantial operating hours on the RF system, considerable information on reliability of the 5 kW CW klystrons has been obtained. High early failure rates led to examination of the operating conditions and failure modes. Internal ceramic contamination caused premature failure of gun potting material and ultimate tube demise through arcing or ceramic fracture. A planned course of reporting and reconditioning of approximately 300 klystrons, plus careful attention to operating conditions and periodic analysis of operational data, has substantially reduced the failure rate. It is anticipated that implementation of planned supplemental monitoring systems for the klystrons will allow most catastrophic failures to be avoided. By predicting end of life, tubes can be changed out before they fail, thus minimizing unplanned downtime. Initial tests have also been conducted on this same klystron operated at higher voltages with resultant higher output power. The outcome of these tests will provide information to be considered for future upgrades to the accelerator

  15. Performance of Combustion Engineering fuel in operating PWRs

    International Nuclear Information System (INIS)

    Andrews, M.G.; Freeburn, H.R.; Wohlsen, W.D.

    1979-01-01

    Performance data on fuel assembly components from seven (7) operating reactors are presented, and discussed in detail where potential problems have occurred and been resolved. Fuel rod performance has continually improved over the last four (4) years with the gradual changeover to the current C-E fuel design. The reliability level is estimated at better than 99.99%, based on activity levels obtained through January 1979 at each plant. Control rod guide tubes have shown various degrees of wear caused by vibration of the control rods in their fully-withdrawn position. The retrofit of wear sleeves within the top portion of the affected guide tubes during routine refueling has permitted the use of these fuel assemblies with no significant loss in performance or safety margins

  16. Multi-Objective Distribution Network Operation Based on Distributed Generation Optimal Placement Using New Antlion Optimizer Considering Reliability

    Directory of Open Access Journals (Sweden)

    KHANBABAZADEH Javad

    2016-10-01

    Full Text Available Distribution network designers and operators are trying to deliver electrical energy with high reliability and quality to their subscribers. Due to high losses in the distribution systems, using distributed generation can improves reliability, reduces losses and improves voltage profile of distribution network. Therefore, the choice of the location of these resources and also determining the amount of their generated power to maximize the benefits of this type of resource is an important issue which is discussed from different points of view today. In this paper, a new multi-objective optimal location and sizing of distributed generation resources is performed to maximize its benefits on the 33 bus distribution test network considering reliability and using a new Antlion Optimizer (ALO. The benefits for DG are considered as system losses reduction, system reliability improvement and benefits from the sale electricity and voltage profile improvement. For each of the mentioned benefits, the ALO algorithm is used to optimize the location and sizing of distributed generation resources. In order to verify the proposed approach, the obtained results have been analyzed and compared with the results of particle swarm optimization (PSO algorithm. The results show that the ALO has shown better performance in optimization problem solution versus PSO.

  17. PERFORMANCE ASSESSMENT IN OPERATING DRY PORTS

    Directory of Open Access Journals (Sweden)

    Ciortescu Cezar-Gabriel

    2010-12-01

    Full Text Available In this paper, an approach for recognizing and defining correct and operable performance will be presented with the purpose of evaluating the effectiveness and efficiency of processes in dry ports (inland intermodal hubs. The challenge in evaluating the possible improvements of the underlying processes lies in the special nature and the complex structure of dry ports. It is important to consider that all the processes are highly interconnected and that changes in parameters in one process also have an impact on parameters in other processes. Furthermore, the performance of dry ports, seen as the backbone of the system, has a significant impact on the overall performance of the whole transportation network.

  18. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Barone, G; The ATLAS collaboration

    2013-01-01

    The Semi-Conductor Tracker (SCT) is a silicon strip detector and one of the key precision tracking devices in the Inner Detector of the ATLAS experiment at CERN LHC. The SCT is constructed of 4088 silicon detector modules for a total of 6.3 million strips. Each module is designed, constructed and tested to operate as a stand-alone unit, mechanically, electrically, optically and thermally. The modules are mounted into two types of structures: one barrel (4 cylinders) and two end-cap systems (9 disks on each end of the barrel). In the talk the current results from the successful operation of the SCT Detector at the LHC and its status after three years of operation will be presented. We will report on the operation of the detector including an overview of the issues we encountered and the observation of significant increases in leakage currents (as expected) from bulk damage due to non-ionising radiation. The main emphasis will be given to the tracking performance of the SCT and the data quality during the >2 ye...

  19. The ATLAS Semiconductor tracker: operations and performance

    CERN Document Server

    Pani, P; The ATLAS collaboration

    2013-01-01

    Tracker After more than 3 years of successful operation at the LHC, we report on the operation and performance of the Semi-Conductor Tracker (SCT) functioning in a high luminosity, high radiation environment. The SCT is part of the ATLAS experiment at CERN and is constructed of 4088 silicon detector modules for a total of 6.3 million strips. Each module is designed, constructed and tested to operate as a stand-alone unit, mechanically, electrically, optically and thermally. The modules are mounted into two types of structures: one barrel (4 cylinders) and two end-cap systems (9 disks on each end of the barrel). The SCT silicon micro-strip sensors are processed in the planar p-in-n technology. The signals are processed in the front-end ABCD3TA ASICs, which use a binary readout architecture. Data is transferred to the off-detector readout electronics via optical fibers. We find 99.3% of the SCT modules are operational, noise occupancy and hit efficiency exceed the design specifications; the alignment is very cl...

  20. Carbohydrate ingestion improves performance of a new reliable test of soccer performance.

    Science.gov (United States)

    Currell, Kevin; Conway, Steve; Jeukendrup, Asker E

    2009-02-01

    The aim of the study was to investigate the reliability of a new test of soccer performance and evaluate the effect of carbohydrate (CHO) on soccer performance. Eleven university footballers were recruited and underwent 3 trials in a randomized order. Two of the trials involved ingesting a placebo beverage, and the other, a 7.5% maltodextrin solution. The protocol comprised a series of ten 6-min exercise blocks on an outdoor Astroturf pitch, separated by the performance of 2 of the 4 soccer-specific tests, making the protocol 90 min in duration. The intensity of the exercise was designed to be similar to the typical activity pattern during soccer match play. Participants performed skill tests of dribbling, agility, heading, and shooting throughout the protocol. The coefficients of variation for dribbling, agility, heading, and shooting were 2.2%, 1.2%, 7.0%, and 2.8%, respectively. The mean combined placebo scores were 42.4 +/- 2.7 s, 43.1 +/- 3.7 s, 210 +/- 34 cm, and 212 +/- 17 points for agility, dribbling, heading, and kicking, respectively. CHO ingestion led to a combined agility time of 41.5 +/- 0.8 s, for dribbling 41.7 +/- 3.5 s, 213 +/- 11 cm for heading, and 220 +/- 5 points for kicking accuracy. There was a significant improvement in performance for dribbling, agility, and shooting (p soccer performance, and ingesting CHO leads to an improvement in soccer performance.

  1. How to keep your steam generator working with low costs for a long and reliable operating time

    International Nuclear Information System (INIS)

    Flammann, T.

    1998-01-01

    Strategic planning of steam generator (SG) maintenance and repair is a key issue for plant availability and reliability. In Germany, maintenance and eventual repair considerations are an integrated part of a multistep concept for reliable SG performance. This concept is addressed as early as in the design phase of a nuclear power plant. In contrast to the tube degradation problems that have been encountered worldwide, SGs of the Siemens/KWU design have proven by operating experience that they are very efficient in minimizing tube corrosion or any other SG related problems. A multilevel concept has been developed, applied and wherever necessary improved in order to ensure reliable operation. The main elements of this concept are thorough design engineering incl. proper material selection and stringent requirements and quality control for fabrication accompanied by tight control requirements of water chemistry environments. In order to counteract tube deficiencies a complete arsenal of maintenance, inspection- and repair-techniques have been developed and successfully applied. Performance of SG is continuously evaluated and fixed in lifetime databases. The main indicator for SG integrity still is the eddy-current testing of SG tubes. SG tubes which have shown indications at the eddy current tests are rated with lifetime threshold values and SGs affected by tube damages are inspected, and eventually, repaired, based on individual assessment criteria. (author)

  2. Study on evaluation index system of operational performance of municipal wastewater treatment plants in China

    Science.gov (United States)

    Xiaoxin, Zhang; Jin, Huang; Ling, Lin; Yan, Li

    2018-05-01

    According to the undeveloped evaluation method for the operational performance of the municipal wastewater treatment plants, this paper analyzes the policies related to sewage treatment industry based on the investigation of the municipal wastewater treatment plants. The applicable evaluation method for the operational performance was proposed from environmental protection performance, resources and energy consumption, technical and economic performance, production management and main equipment, providing a reliable basis for scientific evaluation of the operation as well as improving the operational performance of municipal wastewater treatment plant.

  3. Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.

    Energy Technology Data Exchange (ETDEWEB)

    Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

    2006-03-01

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

  4. Blinded evaluation of interrater reliability of an operative competency assessment tool for direct laryngoscopy and rigid bronchoscopy.

    Science.gov (United States)

    Ishman, Stacey L; Benke, James R; Johnson, Kaalan Erik; Zur, Karen B; Jacobs, Ian N; Thorne, Marc C; Brown, David J; Lin, Sandra Y; Bhatti, Nasir; Deutsch, Ellen S

    2012-10-01

    OBJECTIVES To confirm interrater reliability using blinded evaluation of a skills-assessment instrument to assess the surgical performance of resident and fellow trainees performing pediatric direct laryngoscopy and rigid bronchoscopy in simulated models. DESIGN Prospective, paired, blinded observational validation study. SUBJECTS Paired observers from multiple institutions simultaneously evaluated residents and fellows who were performing surgery in an animal laboratory or using high-fidelity manikins. The evaluators had no previous affiliation with the residents and fellows and did not know their year of training. INTERVENTIONS One- and 2-page versions of an objective structured assessment of technical skills (OSATS) assessment instrument composed of global and a task-specific surgical items were used to evaluate surgical performance. RESULTS Fifty-two evaluations were completed by 17 attending evaluators. The instrument agreement for the 2-page assessment was 71.4% when measured as a binary variable (ie, competent vs not competent) (κ = 0.38; P = .08). Evaluation as a continuous variable revealed a 42.9% percentage agreement (κ = 0.18; P = .14). The intraclass correlation was 0.53, considered substantial/good interrater reliability (69% reliable). For the 1-page instrument, agreement was 77.4% when measured as a binary variable (κ = 0.53, P = .0015). Agreement when evaluated as a continuous measure was 71.0% (κ = 0.54, P formative feedback on operational competency.

  5. Intra-operative reliability of ShapeMatch cutting guide placement in total knee arthroplasty.

    Science.gov (United States)

    Clark, Gavin; Leong, Anthony; McEwen, Peter; Steele, Robert; Tran, Ton; Trivett, Adrian

    2013-01-01

    Custom cutting guides based on pre-operative imaging have been introduced for total knee arthroplasty (TKA). The aim of this prospective cohort study was to assess the reliability of repeated placement of custom cutting guides by multiple surgeons in a group of patients undergoing TKA. Custom cutting guides (ShapeMatch®, Stryker Orthopaedics) were designed from pre-operative MRI scans. The treating surgeon placed each guide on the femur and tibia of each patient three times without pinning the block. The three-dimensional position and orientation of the guide was measured for each repetition using a computer navigation system. The surgeon was blinded to the navigation system display. Data from 24 patients and 6 surgeons were analyzed. Intraclass correlation coefficients for all measurement parameters were in the range 0.889-0.997 (excellent), and all comparisons were statistically significant (p reliable.

  6. Measurements of operator performance - an experimental setup

    International Nuclear Information System (INIS)

    Netland, K.

    1980-01-01

    The human has to be considered as an important element in a process control system, even if the degree of automation is extremely high. Other elements, e.g. computer, displays, etc., can to a large extent be described and quantified. The human (operator), is difficult to describe in a precise way, and it is just as difficult to predict his thinking and acting in a control room environment. Many factors influence his performance, such as: experience, motivation, level of knowledge, training, control environment, job organization, etc. These factors have to a certain degree to be described before guidelines for design of the man-process interfaces and the control room layout can be developed. For decades, the psychological science has obtained knowledge of the human mind and behaviour. This knowledge should have the potential of a positive input on our effort to describe the factors influencing the operator performance. Even if the human is complex, a better understanding of his thinking and acting, and a more precise description of the factors influencing his performance can be obtained. At OECD Halden Reactor Project an experimental set-up for such studies has been developed and implemented in the computer laboratory. The present set-up includes elements as a computer- and display-based control room, a simulator representing a nuclear power plant, training programme for the subjects, and methods for the experiments. Set-up modules allow reconfiguration of experiments. (orig./HP)

  7. Microgrid Design Analysis Using Technology Management Optimization and the Performance Reliability Model

    Energy Technology Data Exchange (ETDEWEB)

    Stamp, Jason E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Eddy, John P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jensen, Richard P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Munoz-Ramos, Karina [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    Microgrids are a focus of localized energy production that support resiliency, security, local con- trol, and increased access to renewable resources (among other potential benefits). The Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capa- bility Technology Demonstration (JCTD) program between the Department of Defense (DOD), Department of Energy (DOE), and Department of Homeland Security (DHS) resulted in the pre- liminary design and deployment of three microgrids at military installations. This paper is focused on the analysis process and supporting software used to determine optimal designs for energy surety microgrids (ESMs) in the SPIDERS project. There are two key pieces of software, an ex- isting software application developed by Sandia National Laboratories (SNL) called Technology Management Optimization (TMO) and a new simulation developed for SPIDERS called the per- formance reliability model (PRM). TMO is a decision support tool that performs multi-objective optimization over a mixed discrete/continuous search space for which the performance measures are unrestricted in form. The PRM is able to statistically quantify the performance and reliability of a microgrid operating in islanded mode (disconnected from any utility power source). Together, these two software applications were used as part of the ESM process to generate the preliminary designs presented by SNL-led DOE team to the DOD. Acknowledgements Sandia National Laboratories and the SPIDERS technical team would like to acknowledge the following for help in the project: * Mike Hightower, who has been the key driving force for Energy Surety Microgrids * Juan Torres and Abbas Akhil, who developed the concept of microgrids for military instal- lations * Merrill Smith, U.S. Department of Energy SPIDERS Program Manager * Ross Roley and Rich Trundy from U.S. Pacific Command * Bill Waugaman and Bill Beary from U.S. Northern Command * Tarek Abdallah, Melanie

  8. Improvement of the reliability and efficiency of the NPP operation by training high-skilled personnel

    International Nuclear Information System (INIS)

    Korolev, V.V.; Sereda, G.A.

    1981-01-01

    Nuclear power at the modern stage of development is characterized by utilization of large power commercial reactors high technical specifications and economic parameters of which can be provided only at high reliability of the equipment and high qualification of the personnel. Special educational institution - Institute of nuclear engineering is organized for education of the operation personnel of high qualification for modern NPPs. Discussed are some problems occurring in this connection [ru

  9. Operating reliability of valves in French pressurized water nuclear power plants

    International Nuclear Information System (INIS)

    Conte

    1986-10-01

    Taking into account the large numbers of valves (about 10000) of a PWR nuclear power plant, the importance of some valves in the safety functions and the cost resulting from their unavailability, the individual operability of these equipments has to be ensured at a high reliability level. This assurance can be obtained by means of an effort at all the stages which contribute to the quality of the product: design, qualification tests, fabrication, tests at the start-up stage, maintenance and tests during the power plant operation, experience feedback. This paper emphasizes more particularly on the tests carried out on loops of qualification [fr

  10. Reliability Calculations

    DEFF Research Database (Denmark)

    Petersen, Kurt Erling

    1986-01-01

    Risk and reliability analysis is increasingly being used in evaluations of plant safety and plant reliability. The analysis can be performed either during the design process or during the operation time, with the purpose to improve the safety or the reliability. Due to plant complexity and safety...... and availability requirements, sophisticated tools, which are flexible and efficient, are needed. Such tools have been developed in the last 20 years and they have to be continuously refined to meet the growing requirements. Two different areas of application were analysed. In structural reliability probabilistic...... approaches have been introduced in some cases for the calculation of the reliability of structures or components. A new computer program has been developed based upon numerical integration in several variables. In systems reliability Monte Carlo simulation programs are used especially in analysis of very...

  11. Improving Reliability of Service Operation Using FMEA Review and New Opportunity for Investigations

    Science.gov (United States)

    Sutrisno, Agung; Gunawan, Indra

    2016-01-01

    Despite its growing contribution to the global economy, investigation on the application status of service FMEA study to support realization of reliable service operation is very limited in literature. Motivated by such situation, the paper presented an initial survey on the status and research gaps in developing and applying FMEA in service sectors. Systematic preliminary survey using specific criteria are undertaken. Our study indicated that development and application of service FMEA are partially addressing the characteristics of service operations and it is still applied into the good deed and profit oriented operations. Opportunities for further investigation pertaining to advancement of its decision supporting tool for service risk appraisal, its modification to cope with sustainability related requirements and application of service FMEA in not for profit oriented operations are presented as new avenues for further investigation

  12. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Yamada, M; The ATLAS collaboration

    2011-01-01

    The SemiConductor Tracker (SCT), comprising of silicon micro-strip detectors is one of the key precision tracking devices in the ATLAS Inner Detector. ATLAS is one of the experiments at CERN LHC. The completed SCT is in very good shapes with 99.3% of the SCT’s 4088 modules (a total of 6.3 million strips) are operational. The noise occupancy and hit efficiency exceed the design specifications. In the talk the current status of the SCT will be reviewed. We will report on the operation of the detector, its performance and observed problems, with stress on the sensor and electronics performance. In December 2009 the ATLAS experiment at the CERN Large Hadron Collider (LHC) recorded the first proton-proton collisions at a centre-of-mass energy of 900 GeV and this was followed by the unprecedented energy of 7 TeV in March 2010. The Semi-Conductor Tracker (SCT) is the key precision tracking device in ATLAS, made from silicon micro-strip detectors processed in the planar p-in-n technology. The signals from the strip...

  13. Self-assessment of human performance errors in nuclear operations

    International Nuclear Information System (INIS)

    Chambliss, K.V.

    1996-01-01

    One of the most important approaches to improving nuclear safety is to have an effective self-assessment process in place, whose cornerstone is the identification and improvement of human performance errors. Experience has shown that significant events usually have had precursors of human performance errors. If these precursors are left uncorrected or not understood, the symptoms recur and result in unanticipated events of greater safety significance. The Institute of Nuclear Power Operations (INPO) has been championing the cause of promoting excellence in human performance in the nuclear industry. INPO's report, open-quotes Excellence in Human Performance,close quotes emphasizes the importance of several factors that play a role in human performance. They include individual, supervisory, and organizational behaviors; real-time feedback that results in specific behavior to produce safe and reliable performance; and proactive measures that remove obstacles from excellent human performance. Zack Pate, chief executive officer and president of INPO, in his report, open-quotes The Control Room,close quotes provides an excellent discussion of serious events in the nuclear industry since 1994 and compares them with the results from a recent study by the National Transportation Safety Board of airline accidents in the 12-yr period from 1978 to 1990 to draw some common themes that relate to human performance issues in the control room

  14. High efficiency motors - performance, economy and reliability, by optimisation

    Energy Technology Data Exchange (ETDEWEB)

    Caselotti, P.; Conchetto, A.; Tavner, P.J.

    2000-07-01

    The challenge of the efficiency initiatives in North America and the European Union is to improve performance without reducing power-weight by adding materials and increasing cost. This has been the subject of other papers, Haataja et al Ref2, where the key area has been identified as reducing loss. This paper suggests that addressing the fundamental problem of heat transfer in the TEFC machine, in addition to reducing loss will make it possible to improve performance and still provide competitive products. (orig.)

  15. World class performance: the outage/operating cycle continuum

    Energy Technology Data Exchange (ETDEWEB)

    Remphal, M. [Ontario Power Generation, Darlington, Ontario (Canada)

    2011-07-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  16. World class performance: the outage/operating cycle continuum

    International Nuclear Information System (INIS)

    Remphal, M.

    2011-01-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  17. Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey C. JOe; Ronald L. Boring

    2014-06-01

    Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

  18. Using operational data to estimate the reliable yields of water-supply wells

    Science.gov (United States)

    Misstear, Bruce D. R.; Beeson, Sarah

    The reliable yield of a water-supply well depends on many different factors, including the properties of the well and the aquifer; the capacities of the pumps, raw-water mains, and treatment works; the interference effects from other wells; and the constraints imposed by ion licences, water quality, and environmental issues. A relatively simple methodology for estimating reliable yields has been developed that takes into account all of these factors. The methodology is based mainly on an analysis of water-level and source-output data, where such data are available. Good operational data are especially important when dealing with wells in shallow, unconfined, fissure-flow aquifers, where actual well performance may vary considerably from that predicted using a more analytical approach. Key issues in the yield-assessment process are the identification of a deepest advisable pumping water level, and the collection of the appropriate well, aquifer, and operational data. Although developed for water-supply operators in the United Kingdom, this approach to estimating the reliable yields of water-supply wells using operational data should be applicable to a wide range of hydrogeological conditions elsewhere. Résumé La productivité d'un puits capté pour l'adduction d'eau potable dépend de différents facteurs, parmi lesquels les propriétés du puits et de l'aquifère, la puissance des pompes, le traitement des eaux brutes, les effets d'interférences avec d'autres puits et les contraintes imposées par les autorisations d'exploitation, par la qualité des eaux et par les conditions environnementales. Une méthodologie relativement simple d'estimation de la productivité qui prenne en compte tous ces facteurs a été mise au point. Cette méthodologie est basée surtout sur une analyse des données concernant le niveau piézométrique et le débit de prélèvement, quand ces données sont disponibles. De bonnes données opérationnelles sont particuli

  19. Operational reliability of the GPK and the 4PP-2 heading machines

    Energy Technology Data Exchange (ETDEWEB)

    Ivanov, N.A.; Demchenko, N.T.

    1985-09-01

    Reliability of the GPK and 4PP-2 heading machines used in 98 development workings in 40 coal mines is analyzed. Failure analysis was based on records of 199 heading machines after overhauls. The mean-time-between-failures of the GPK and the 4PP-2 was 270 min (93 t) and 155 min (35 t), availability coefficient was 0.83 and 0.77 respectively. Reliability of the GPK on the average was higher than that of the 4PP-2. The mean-time-to-overhaul of the GPK was 17.7 months (54,000 t), of the 4PP-2 - 18 months (59,000 t). Time between overhauls in the case of the GPK was 14 months (47,200 t), in the case of the 4PP-2 it was 14.5 months (38,300 t). During the 17.7 months between overhauls the GPK failed 580 times, the repair operations lasted 530 h. During the 18 month time to overhaul the 4PP-2 failed 1600 times, the repair operations lasted 1300 h. Reliability of major elements of the 2 heading machines is analyzed: cutters, materials handling equipment, electrical equipment, hydraulic systems, dust suppression systems, etc.

  20. FACTORS INFLUENCING HUMAN RELIABILITY OF HIGH TEMPERATURE GAS COOLED REACTOR OPERATION

    Directory of Open Access Journals (Sweden)

    Sigit Santoso

    2016-10-01

    ABSTRAK Peran dan tindakan operator pada reaktor berpendingin gas akan berbeda dengan peran operator pada operasi tipe reaktor lain. Analisis unjuk kerja operator dan faktor yang berpengaruh dapat dilakukan secara komprehensif melalui analisis keandalan manusia(HRA. Melalui HRA dampak dari kesalahan manusia pada sistem maupun cara untuk mengurangi dampak dan frekuensi kesalahan dapat diketahui. Makalah membahas faktor yang berpengaruh pada tindakan operator, yaitu pada kejadian kecelakaan pendingin reaktor gas bersuhu tinggi-HTGR. Analisis untuk kualifikasi faktor pembentuk kinerja(PSF dilakukan berdasarkan kurva keandalan fungsi waktu, dan metode keandalan manusia yang dikembangkan berdasar pada aspek kognitif yaitu Cognitive Reliability and Error Analysis Method (CREAM. Hasil analisis berdasar kurva keandalan fungsi waktu menunjukkan komponen waktu berkontribusi positif pada peningkatan keandalan operator (PSF<1 pada kondisi semua fitur keselamatan berfungsi sesuai rancangan. Sedangkan pada metoda analisis dengan pendekatan kognitif CREAM diketahui selain faktor ketersediaan waktu, faktor pelatihan dan rancangan HMI juga berkontribusi meningkatkan keandalan operator. Faktor pembentuk kinerja keseluruhan diketahui sebesar 0,25 dengan faktor kontribusi positif dominan atau berpengaruh pada penurunan kesalahan manusia adalah ketersediaan waktu (PSF=0,01, dan faktor kontribusi negatif dominan adalah prosedur dan siklus kerja (PSF=5. Nilai PSF tersebut sebagai faktor pengali dalam perhitungan probabilitas kesalahan manusia. Analisis faktor pembentuk kinerja perlu dikembangkan pada skenario kejadian lain untuk selanjutnya digunakan untuk perhitungan dan analisis keandalan manusia yang komprehensif dan perancangan sistem interaksi manusia mesin di ruang kendali. Kata kunci: PSF, HTGR, operator, ruang kendali, keandalan manusia

  1. Operating experience and performance at Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Mittal, Subhash; Gupta, J.P.

    1998-01-01

    Narora Atomic Power Station consists of two units of 220 MWe capacity each. These are Pressurized Heavy Water Reactors, fuelled by natural uranium, moderated and cooled by heavy water. The Station is owned by Nuclear Power Corporation of India Ltd., which is responsible for design, construction, commissioning, and operation of all nuclear power stations in the country. NAPS was the first opportunity to apply operating experiences in design, keeping in view the evolving safety and seismicity requirements, ease of maintenance, inservice inspection needs, improved construction ability and standardization. Both the units of NAPS are having improved safety standards of current international levels. All the equipment are indigenous with improved quality and reliability. The first unit of the station went critical in March 1989 and synchronized to the grid in July 1989. The second units followed with its criticality in October 1991 and synchronization in January 1992. Considering the initial stabilizing period, the performance of both units of NAPS has progressively improved over the years. The annual capacity factor for NAPS - 1 was 90.01% and for NAPS - 2 was 89.01% for the financial year 1997-1998. This paper presents an analysis of the performance during the last three years and measures taken to improve it. The stated enhanced performance could be achieved by improvement in human performance by training/re-training, scrupulous monitoring and review of equipment/systems, institution of adequate procedure and ensuring their adherence. (authors)

  2. The operational performance of the Yale ESTU

    Indian Academy of Sciences (India)

    nal and control system have greatly increased its capability and reliability. Today ... Flow schemes were simplified; an electric heater as well as safety ... installed, the original MP injector was retained except for a new pre-acceleration power.

  3. Reliability analysis of safety systems of nuclear power plant and utility experience with reliability safeguarding of systems during specified normal operation

    International Nuclear Information System (INIS)

    Balfanz, H.P.

    1989-01-01

    The paper gives an outline of the methods applied for reliability analysis of safety systems in nuclear power plant. The main tasks are to check the system design for detection of weak points, and to find possibilities of optimizing the strategies for inspection, inspection intervals, maintenance periods. Reliability safeguarding measures include the determination and verification of the broundary conditions of the analysis with regard to the reliability parameters and maintenance parameters used in the analysis, and the analysis of data feedback reflecting the plant response during operation. (orig.) [de

  4. A Chronological Reliability Model to Assess Operating Reserve Allocation to Wind Power Plants: Preprint

    International Nuclear Information System (INIS)

    Milligan, M. R.

    2001-01-01

    As the use of wind power plants increases worldwide, it is important to understand the effect these power sources have on the operations of the grid. This paper focuses on the operating reserve impact of wind power plants. Many probabilistic methods have been applied to power system analysis, and some of these are the basis of reliability analysis. This paper builds on a probabilistic technique to allocate the operating reserve burden among power plants in the grid. The method was originally posed by Strbac and Kirschen[1] and uses an allocation that prorates the reserve burden based on expected energy not delivered. Extending this method to include wind power plants allows the reserve burden to be allocated among different plants using the same method, yet incorporates information about the intermittent nature of wind power plants

  5. On-line determination of operating limits incorporating constraint costs and reliability assessment

    International Nuclear Information System (INIS)

    Meisingset, M.; Lovas, G. G.

    1997-01-01

    Problems regarding power system operation following deregulation were discussed. The problems arise as a result of the increased power flow pattern created by deregulation and competitive power markets, resulting in power in excess of N-1, (the capacity of transmission lines available), which in turn creates bottlenecks. In a situation like this, constraint costs and security costs (i.e. the cost of supply interruptions) are incurred as the direct result of the deterministic criteria used in reliability assessment. This paper describes an on-line probabilistic method to determine operating limits based on a trade-off between constraint costs and security costs. The probability of the contingencies depend on the existing weather conditions, which therefore has significant impact on the calculated operating limit. In consequence, the proposed method allows power flow to exceed the N-1 limit during normal weather. Under adverse weather conditions the N-1 criteria should be maintained. 15 refs., 13 figs

  6. The ATLAS Pixel Detector operation and performance

    CERN Document Server

    Andreazza, A; The ATLAS collaboration

    2010-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN. It consists of 1744 silicon sensors equipped with approximately $80 imes 10^6$~electronic channels, providing typically three measurement points with high resolution for particles emerging from the beam-interaction region. The complete Pixel Detector has been taking part in cosmic-ray data-taking since 2008. Since November 2009 it has been operated with LHC colliding beams at $sqrt{s}=900$~GeV, 2.36~TeV and 7 TeV. The detector operated with an active fraction of 97.2% at a threshold of 3500~$e$, showing a noise occupancy rate better than $10^{-9}$~hit/pixel/BC and a track association efficiency of 99%. The Lorentz angle for electrons in silicon is measured to be $ heta_mathrm{L}=12.11^circ pm 0.09^circ$ and its temperature dependence has been verified. The pulse height information from the time-over-threshold technique allows to improve the point resolution using charge sharing and to perform parti...

  7. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Chalupkova, I; The ATLAS collaboration

    2012-01-01

    The Semi-Conductor Tracker (SCT) is a silicon strip detector and one of the key precision tracking devices in the Inner Detector of the ATLAS experiment at CERN LHC. The SCT is constructed of 4088 silicon detector modules for a total of 6.3 million strips. Each module is designed, constructed and tested to operate as a stand-alone unit, mechanically, electrically, optically and thermally. The modules are mounted into two types of structures: one barrel (4 cylinders) and two end-cap systems (9 disks on each end of the barrel). The SCT silicon micro-strip sensors are processed in the planar p-in-n technology. The signals from the strips are processed in the front-end ASICS ABCD3TA, working in the binary readout mode. Data is transferred to the off-detector readout electronics via optical fibers. The completed SCT has been installed inside the ATLAS experimental cavern since 2007 and has been operational since then. Calibration data has been taken regularly and analyzed to determine the noise performance of the ...

  8. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    NAGAI, K; The ATLAS collaboration

    2012-01-01

    The Semi-Conductor Tracker (SCT) is a silicon strip detector and one of the key precision tracking devices in the Inner Detector of the ATLAS experiment at CERN LHC. The SCT is constructed of 4088 silicon detector modules for a total of 6.3 million strips. Each module is designed, constructed and tested to operate as a stand-alone unit, mechanically, electrically, optically and thermally. The modules are mounted into two types of structures: one barrel (4 cylinders) and two end-cap systems (9 disks on each end of the barrel). The SCT silicon micro-strip sensors are processed in the planar p-in-n technology. The signals from the strips are processed in the front-end ASICS ABCD3TA, working in the binary readout mode. Data is transferred to the off-detector readout electronics via optical fibres. The completed SCT has been installed inside the ATLAS experimental cavern since 2007 and has been operational since then. Calibration data has been taken regularly and analysed to determine the noise performance of the ...

  9. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Chalupkova, I; The ATLAS collaboration

    2012-01-01

    The Semi-Conductor Tracker (SCT) is a silicon strip detector and one of the key precision tracking devices in the Inner Detector (ID) of the ATLAS experiment at CERN LHC. The SCT is constructed of 4088 silicon detector modules with a total of 6.3 million strips. Each module is designed, constructed and tested to operate as a stand-alone unit, mechanically, electrically, optically and thermally. The modules are mounted into two types of structures: one barrel (4 cylinders) and two end-cap systems (9 disks on each side of the barrel). The SCT silicon microstrip sensors are processed in the planar p-in-n technology. The signals from the strips are processed in the front-end ASICs ABCD3TA, working in the binary readout mode. Data is transferred to the off-detector readout electronics via optical fibres. SCT has been installed inside the ATLAS experimental cavern since 2007 and has been operational ever since. Calibration data has been taken regularly and analysed to determine the noise performance of the system. ...

  10. A Valid and Reliable Tool to Assess Nursing Students` Clinical Performance

    OpenAIRE

    Mehrnoosh Pazargadi; Tahereh Ashktorab; Sharareh Khosravi; Hamid Alavi majd

    2013-01-01

    Background: The necessity of a valid and reliable assessment tool is one of the most repeated issues in nursing students` clinical evaluation. But it is believed that present tools are not mostly valid and can not assess students` performance properly.Objectives: This study was conducted to design a valid and reliable assessment tool for evaluating nursing students` performance in clinical education.Methods: In this methodological study considering nursing students` performance definition; th...

  11. Validity and reliability of tests determining performance-related components of wheelchair basketball

    NARCIS (Netherlands)

    de Groot, Sonja; Balvers, Inge J.M.; Kouwenhoven, Sanne M.; Janssen, Thomas W.J.

    The purpose of this study was to investigate the reliability and validity of wheelchair basketball field tests. Nineteen wheelchair basketball players performed 10 test items twice to determine the reliability. The validity of the tests was assessed by relating the scores to the players'

  12. Validity and reliability of tests determining performance-related components of wheelchair basketball

    NARCIS (Netherlands)

    De Groot, Sonja; Balvers, Inge J. M.; Kouwenhoven, Sanne M.; Janssen, Thomas W. J.

    2012-01-01

    The purpose of this study was to investigate the reliability and validity of wheelchair basketball field tests. Nineteen wheelchair basketball players performed 10 test items twice to determine the reliability. The validity of the tests was assessed by relating the scores to the players'

  13. Comparison of reading performance tests concerning difficulty of sentences and paragraphs and their reliability

    NARCIS (Netherlands)

    Brussee, T.; van Nispen, R.M.A.; Klerkx, E.M.F.J.; Knol, D.L.; van Rens, G.H.M.B.

    2015-01-01

    In research and practice, sentences or paragraphs of reading tests may be randomly chosen to assess reading performance. This means that in addition to test reliability, all sentences or paragraphs should be reliable and equally difficult to read. The sentences and paragraphs of five (un-)

  14. [Tolerance for frustration as a reliability factor in the work of the human operator].

    Science.gov (United States)

    Makarevich, O F

    1986-01-01

    Frustration tolerance is a personality trait that contributes to the reliable performance of an air traffic controller. This paper presents the results of a psychological examination of air traffic controllers using the Rosenzweig frustration test and emphasizes a correlation between the predominant behavior type in frustrating circumstances and professional success. The paper contains examples of realistic observations over air traffic controllers which confirm experimental data.

  15. The European reliability data system. An organized information exchange on the operation of European nuclear reactors

    International Nuclear Information System (INIS)

    Mancini, G.; Amesz, J.; Bastianini, P.; Capobianchi, S.

    1983-01-01

    The paper revises the aims and objectives of the European Reliability Data System (ERDS), a centralized system collecting and organizing, at European level, information related to the operation of LWRs. The ERDS project was started in 1977 and after a preliminary feasibility study that ended in 1979 is now proceeding towards the final design and implementation stages. ERDS exploits information collected in national data systems and information deriving from single reactor sources. The paper describes first the development of the four data banks constituting the system: Component Event Data Bank, CEDB; Abnormal Occurrences Reporting System, AORS; Operating Unit Status Report, OUSR; and Generic Reliability Parameter Data Bank, GRPDB. Several typical aspects concerning the project are then outlined from the need of homogeneization of data and therefore the need for setting up reference classifications, to the problem of data transcoding and input into the system. Furthermore, the need is stressed of involving much more deeply nuclear power plant operators into the process of data acquisition by providing them with a useful feedback from the data analysis. (author)

  16. Impact of power plant reliability on the choice of operating parameter values

    International Nuclear Information System (INIS)

    Kramer, R.A.

    1985-01-01

    In this thesis, the basic structure for the development of a methodology to evaluate the effect of operating parameters on plant availability and generating system economic dispatch optimization is described. Plant availability is determined by a fault free model. In this model historic, time dependent, component induced forced outage data is utilized as the basis for the calculation of projected plant forced outage rates. The influence of a particular fuel-cycle length at a specific generating station on the operational planning of a multi unit generating system is considered. The basis of the dispatch of units in this analysis is optimal economic operation, i.e., the minimization of the cost of reliability supplying electricity to the system's customers. As a result of the utilization of this technique, a simplified example that considers the choice between a 12- and 18-month fuel cycle length is evaluated in terms of its impact on plant availability, fuel cycle economics and overall optimal generating system economic dispatch. The reliability portion of this methodology is applied to a simplified representation of the recirculation system of a pressurized water reactor nuclear power plant to illustrate the analytic techniques

  17. Water chemistry technology. One of the key technologies for safe and reliable nuclear power plant operation

    International Nuclear Information System (INIS)

    Uchida, Shunsuke; Katsumura, Yosuke

    2013-01-01

    Water chemistry control is one of the key technologies to establish safe and reliable operation of nuclear power plants. Continuous and collaborative efforts of plant manufacturers and plant operator utilities have been focused on optimal water chemistry control, for which, a trio of requirements for water chemistry should be simultaneously satisfied: (1) better reliability of reactor structures and fuel rods; (2) lower occupational exposure and (3) fewer radwaste sources. Various groups in academia have carried out basic research to support the technical bases of water chemistry in plants. The Research Committee on Water Chemistry of the Atomic Energy Society of Japan (AESJ), which has now been reorganized as the Division of Water Chemistry (DWC) of AESJ, has played important roles to promote improvements in water chemistry control, to share knowledge about and experiences with water chemistry control among plant operators and manufacturers and to establish common technological bases for plant water chemistry and then to transfer them to the next generation of plant workers engaged in water chemistry. Furthermore, the DWC has tried and succeeded arranging R and D proposals for further improvement in water chemistry control through roadmap planning. In the paper, major achievements in plant technologies and in basic research studies of water chemistry in Japan are reviewed. The contributions of the DWC to the long-term safe management of the damaged reactors at the Fukushima Daiichi Nuclear Power Plant until their decommissioning are introduced. (author)

  18. New design of engineered safety features-component control system to improve performance and reliability

    International Nuclear Information System (INIS)

    Kim, S.T.; Jung, H.W.; Lee, S.J.; Cho, C.H.; Kim, D.H.; Kim, H.

    2006-01-01

    Full text: Full text: The Engineered Safety Features-Component Control System (ESF-CCS) controls the engineered safety features of a Nuclear Power Plant such as Solenoid Operated Valves (SOV), Motor Operated Valves (MOV), pumps, dampers, etc. to mitigate the effects of a Design Basis Accident (DBA) or an abnormal operation. ESF-CCS serves as an interface system between the Plant Protection System (PPS) and remote actuation devices. ESF-CCS is composed of fault tolerant Group Controllers GC, Loop Controllers (LC), ESF-CCS Test and Interface Processor (ETIP) and Cabinet Operator Module (COM) and Control Channel Gateway (CCG) etc. GCs in each division are designed to be fully independent triple configuration, which perform system level NSSS and BOP ESFAS logic (2-out-of-4 logic and l-out-of-2 logic, respectively) making it possible to test each GC individually during normal operation. In the existing configuration, the safety-related plant component control is part of the Plant Control System (PCS) non-safety system. For increased safety and reliability, this design change incorporates this part into the LCs, and is therefore designed according to the safety-critical system procedures. The test and diagnosis capabilities of ETIP and COM are reinforced. By means of an automatic periodic test for all main functions of the system, it is possible to quickly determine an abnormal status of the system, and to decrease the elapsed time for tests, thus effectively increasing availability. ESF-CCS consists of four independent divisions (A, B, C, and D) in the Advanced Power Reactor 1400 (APR1400). One prototype division is being manufactured and will be tested

  19. Human reliability analysis of performing tasks in plants based on fuzzy integral

    International Nuclear Information System (INIS)

    Washio, Takashi; Kitamura, Yutaka; Takahashi, Hideaki

    1991-01-01

    The effective improvement of the human working conditions in nuclear power plants might be a solution for the enhancement of the operation safety. The human reliability analysis (HRA) gives a methodological basis of the improvement based on the evaluation of human reliability under various working conditions. This study investigates some difficulties of the human reliability analysis using conventional linear models and recent fuzzy integral models, and provides some solutions to the difficulties. The following practical features of the provided methods are confirmed in comparison with the conventional methods: (1) Applicability to various types of tasks (2) Capability of evaluating complicated dependencies among working condition factors (3) A priori human reliability evaluation based on a systematic task analysis of human action processes (4) A conversion scheme to probability from indices representing human reliability. (author)

  20. The purpose and organisation of reliability and risk assessment studies for power plant in operation

    International Nuclear Information System (INIS)

    Ohlmeier, H.

    1989-01-01

    Upon recommendation of the Reaktorsicherheitskommission RSK, specific, probabilistic safety analyses have to be made within the next few years for every nuclear power plant in operation. The paper deals with the activities and tasks and the necessary organisational preparations to be made for carrying out the studies. A systematic determination of reliability parameters and establishment of suitable computer codes are one of the major tasks in the preparatory phase, and information for further quantification of safety reserves and more plant-specific emergency management plans will be major results of the studies. (orig.) [de

  1. Reliability of sub-seabed disposal operations for high level waste

    International Nuclear Information System (INIS)

    Sarshar, M.M.

    1985-09-01

    This report describes a study carried out into the reliability of two methods of disposal of heat generating radioactive waste: by drilled emplacement in holes drilled into the ocean sediments, and by the use of penetrators to drive the waste below the ocean floor. The study has concentrated on the risk of events leading to the release of radioactivity to the environment, and also on the hazard to personnel involved in the operation. A Failure Mode, Effects and Criticality Analysis and a Fault Tree Analysis have been used in the assessment, and the relative importance of each contributory factor estimated. (author)

  2. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    Energy Technology Data Exchange (ETDEWEB)

    Haeusermann, R [Kernkraftwerk Leibstadt AG, Leibstadt (Switzerland)

    1997-10-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs.

  3. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    International Nuclear Information System (INIS)

    Haeusermann, R.

    1997-01-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs

  4. Forward lunge as a functional performance test in ACL deficient subjects: test-retest reliability

    DEFF Research Database (Denmark)

    Alkjaer, Tine; Henriksen, Marius; Dyhre-Poulsen, Poul

    2009-01-01

    The forward lunge movement may be used as a functional performance test of anterior cruciate ligament (ACL) deficient and reconstructed subjects. The purposes were 1) to determine the test-retest reliability of a forward lunge in healthy subjects and 2) to determine the required numbers...... of repetitions necessary to yield satisfactory reliability. Nineteen healthy subjects performed four trials of a forward lunge on two different days. The movement time, impulses of the ground reaction forces (IFz, IFy), knee joint kinematics and dynamics during the forward lunge were calculated. The relative...... reliability was determined by calculation of Intraclass Correlation Coefficients (ICC). The IFz, IFy and the positive work of the knee extensors showed excellent reliability (ICC >0.75). All other variables demonstrated acceptable reliability (0.4>ICCreliability increased when more than...

  5. 14 CFR 136.13 - Helicopter performance plan and operations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...

  6. Human reliability and plant operating efficiency: Are 12-hour work schedules cause for concern?

    International Nuclear Information System (INIS)

    Baker, T.L.

    1992-01-01

    Since the introduction of 12-h shifts to the US nuclear power industry only 8 yr ago, compressed workweek schedules have proliferated among operations departments at a phenomenal rate. Many plants that continue to use 8-h shifts during normal operations routinely change to scheduled 12-h shifts during refueling or maintenance outages. The most critical issue in the use of extended work shifts is whether alertness, physical stamina, or mental performance are compromised to the point of reducing safety or efficiency of nuclear power plant operation. Laboratory and field research sponsored by the National Institute of Occupational Safety and Health suggests that alertness, measured by self-ratings, and mental performance, measured by computer-based performance tests, are impaired on 12-h shifts compared with 8-h shifts. In contrast to these findings, plant operating efficiency and operator performance have been rated as improved in two field studies conducted in operating nuclear power plants (Fast Flux Test Facility, Washington and Ontario Hydro, Canada). A recent Electric Power Research Institute review of nuclear industry experience with 12-h shifts also suggests an overwhelmingly positive rating of 12-h schedules from both control room operators and management

  7. Pump performance and reliability follow-up by the French Safety Authorities

    International Nuclear Information System (INIS)

    Clausner, J.P.; De La Ronciere, X.; Scott de Martinville, E.; Courbiere, P.

    1990-12-01

    This paper will present, through actual examples, the methodology of the performance and reliability safety-related pumps evaluation applied by the French Safety Authorities and the lessons drawn from this evaluation

  8. Impact of scaling on the performance and reliability degradation of metal-contacts in NEMS devices

    KAUST Repository

    Dadgour, Hamed F.; Hussain, Muhammad Mustafa; Cassell, Alan M.; Singh, Navab R.; Banerjee, Kaustav

    2011-01-01

    thoroughly investigated in the literature. Such a study is essential because metal contacts play a critical role in determining the overall performance and reliability of NEMS. Therefore, the comprehensive analytical study presented in this paper highlights

  9. Improved Yield, Performance and Reliability of High-Actuator-Count Deformable Mirrors, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The project team will conduct processing and design research aimed at improving yield, performance, and reliability of high-actuator-count micro-electro-mechanical...

  10. Improvement in operators training for better performance of RAPS

    International Nuclear Information System (INIS)

    Banerjee, D.K.

    1989-01-01

    Nuclear Power Corporation (India) will need substantial number of technical personnel in the next couple of years to operate the new power plants. With number of stations coming up within a short span of time, standardisation of training, improved quality trainer, better technical support will be required to ensure reliable operation. (author)

  11. Superior operation performance of ATMEA1

    International Nuclear Information System (INIS)

    Okabe, Yasuhiko; Kanagawa, Takashi; Lauret, Philippe; Castello, Gerard

    2009-01-01

    ATMEA, a Joint Venture Company of AREVA and Mitsubishi Heavy Industries (MHI) offers an innovative and reliable mid-sized Generation III + Pressurized Water Reactor (PWR) - ATMEA1 - based on its parent companies' experience and technology in order to meet the market's needs and requirements. (author)

  12. Assessment of reliability and maintenance of motor operated valves at Finnish NPPS

    International Nuclear Information System (INIS)

    Laakso, K.; Haenninen, S.; Simola, K.

    1994-01-01

    This paper summarizes two studies on motor operated valve (MOV) failure and maintenance experiences in Finnish nuclear power plants. In the first study, described in section 2 of this paper, the failure reports of MOVs at Finnish BWR units from a nine years' time period were analyzed in a systematic way. The dominant failure mechanisms were identified and time-dependencies in failure occurrence were studied. This study initiated an experience based reliability centered maintenance (RCM) analysis of motor operated valve drives, which is summarized in chapter 3 of this paper. The RCM analysis resulted in the identification and proposal of the most suitable and effective maintenance tasks for consideration. 9 refs, 3 figs, 1 tab

  13. A Fast Optimization Method for Reliability and Performance of Cloud Services Composition Application

    Directory of Open Access Journals (Sweden)

    Zhao Wu

    2013-01-01

    Full Text Available At present the cloud computing is one of the newest trends of distributed computation, which is propelling another important revolution of software industry. The cloud services composition is one of the key techniques in software development. The optimization for reliability and performance of cloud services composition application, which is a typical stochastic optimization problem, is confronted with severe challenges due to its randomness and long transaction, as well as the characteristics of the cloud computing resources such as openness and dynamic. The traditional reliability and performance optimization techniques, for example, Markov model and state space analysis and so forth, have some defects such as being too time consuming and easy to cause state space explosion and unsatisfied the assumptions of component execution independence. To overcome these defects, we propose a fast optimization method for reliability and performance of cloud services composition application based on universal generating function and genetic algorithm in this paper. At first, a reliability and performance model for cloud service composition application based on the multiple state system theory is presented. Then the reliability and performance definition based on universal generating function is proposed. Based on this, a fast reliability and performance optimization algorithm is presented. In the end, the illustrative examples are given.

  14. Increasing nuclear safety and operational reliability by upgrading the charging pump mechanical sealing system

    Energy Technology Data Exchange (ETDEWEB)

    Loenhout, Gerard van [Flowserve Corporation, Etten-Leur (Netherlands); Nilsson, Peter [Flowsys Technologies AB, Moelndal (Sweden); Jehander, Magnus [Ringhals AB, Vaeroebacka (Sweden)

    2016-07-01

    For the Ringhals-2 nuclear power plant, three installed centrifugal pumps were designated to have a combined High Head Safety Injection function, as well as a Chemical Volume Control System function. The pumps were originally installed with rubber bellow type mechanical seals, which over time had demonstrated an unreliable sealing performance by displaying high leakages. In 2002, the Ringhals Maintenance engineers initiated to identify a more reliable and robust shaft sealing solution. In 2007, the project was launched and the installation of the first, new mechanical sealing solution took place in the autumn of 2011. In October 2014, these mechanical seals were dismantled and inspected. The inspection confirmed the expected reliability of the new solution.

  15. Increasing nuclear safety and operational reliability by upgrading the charging pump mechanical sealing system

    Energy Technology Data Exchange (ETDEWEB)

    Loenhout, Gerard van [Flowserve Corporation, Etten-Leur (Netherlands); Nilsson, Peter [Flowsys Technologies AB, Moelndal (Sweden); Jehander, Magnus [Ringhals AB, Vaeroebacka (Sweden)

    2016-03-15

    For the Ringhals-2 nuclear power plant, three installed centrifugal pumps were designated to have a combined High Head Safety Injection function, as well as a Chemical Volume Control System function. The pumps were originally installed with rubber bellow type mechanical seals, which over time had demonstrated an unreliable sealing performance by displaying high leakages. In 2002, the Ringhals Maintenance engineers initiated to identify a more reliable and robust shaft sealing solution. In 2007, the project was launched and the installation of the first, new mechanical sealing solution took place in the autumn of 2011. In October 2014, these mechanical seals were dismantled and inspected. The inspection confirmed the expected reliability of the new solution.

  16. Increasing nuclear safety and operational reliability by upgrading the charging pump mechanical sealing system

    International Nuclear Information System (INIS)

    Loenhout, Gerard van; Nilsson, Peter; Jehander, Magnus

    2016-01-01

    For the Ringhals-2 nuclear power plant, three installed centrifugal pumps were designated to have a combined High Head Safety Injection function, as well as a Chemical Volume Control System function. The pumps were originally installed with rubber bellow type mechanical seals, which over time had demonstrated an unreliable sealing performance by displaying high leakages. In 2002, the Ringhals Maintenance engineers initiated to identify a more reliable and robust shaft sealing solution. In 2007, the project was launched and the installation of the first, new mechanical sealing solution took place in the autumn of 2011. In October 2014, these mechanical seals were dismantled and inspected. The inspection confirmed the expected reliability of the new solution.

  17. The importance of the reliability study for the safety operation of chemical plants. Application in heavy water plants

    International Nuclear Information System (INIS)

    Dumitrescu, Maria; Lazar, Roxana Elena; Preda, Irina Aida; Stefanescu, Ioan

    1999-01-01

    Heavy water production in Romania is based on H 2 O-H 2 S isotopic exchange process followed by vacuum isotopic distillation. The heavy water plant are complex chemical systems, characterized by an ensemble of static and dynamic equipment, AMC components, enclosures. Such equipment must have a high degree of reliability, a maximum safety in technological operation and a high availability index. Safety, reliable and economical operation heavy water plants need to maintain the systems and the components at adequate levels of reliability. The paper is a synthesis of the qualitative and quantitative assessment reliability studies for heavy water plants. The operation analysis on subsystems, each subsystems being a well-defined unit, is required by the plant complexity. For each component the reliability indicators were estimated by parametric and non-parametric methods based on the plant operation data. Also, the reliability qualitative and quantitative assessment was done using the fault tree technique. For the dual temperature isotopic exchange plants the results indicate an increase of the MTBF after the first years of operation, illustrating both the operation experience increasing and maintenance improvement. Also a high degree of availability was illustrated by the reliability studies of the vacuum distillation plant. The establishment of the reliability characteristics for heavy water plant represents an important step, a guide for highlighting the elements and process liable to failure being at the same time a planning modality to correlate the control times with the maintenance operations. This is the way to minimise maintenance, control and costs. The main purpose of the reliability study was the safety increase of the plant operation and the support for decision making. (authors)

  18. Reliability Analysis of Operation for Cableways by FTA (Fault Tree Analysis Method

    Directory of Open Access Journals (Sweden)

    Sergej Težak

    2010-05-01

    Full Text Available This paper examines the reliability of the operation of cableway systems in Slovenia, which has major impact on the quality of service in the mountain tourism, mainly in wintertime. Different types of cableway installations in Slovenia were captured in a sample and fault tree analysis (FTA was made on the basis of the obtained data. The paper presents the results of the analysis. With these results it is possible to determine the probability of faults of different types of cableways, which types of faults have the greatest impact on the termination of operation, which components of cableways fail most, what is the impact of age of cableways on the occurrence of the faults. Finally, an attempt was made to find if occurrence of faults on individual cableway installation has also impact on traffic on this cableway due to reduced quality of service. KEYWORDS: cableways, aerial ropeways, chairlifts, ski-tows, quality, faults, fault tree analysis, reliability, service quality, winter tourism, mountain tourist centre

  19. Correlation Relationship of Performance Shaping Factors (PSFs) for Human Reliability Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Bheka, M. Khumalo; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    At TMI-2, operators permitted thousands of gallons of water to escape from the reactor plant before realizing that the coolant pumps were behaving abnormally. The coolant pumps were then turned off, which in turn led to the destruction of the reactor itself as cooling was completely lost within the core. Human also plays a role in many aspects of complex systems e.g. in design and manufacture of hardware, interface between human and system and also in maintaining such systems as well as for coping with unusual events that place the NPP system at a risk. This is why human reliability analysis (HRA) - an aspect of risk assessments which systematically identifies and analyzes the causes and consequences of human decisions and actions - is important in nuclear power plant operations. It either upgrades or degrades human performance; therefore it has an impact on the possibility of error. These PSFs can be used in various HRA methods to estimate Human Error Probabilities (HEPs). There are many current HRA methods who propose sets of PSFs for normal operation mode of NPP. Some of these PSFs in the sets have some degree of dependency and overlap. Overlapping PSFs introduce error in HEP evaluations due to the fact that some elements are counted more than once in data; this skews the relationship amongst PSF and masks the way that the elements interact to affect performance. This study uses a causal model that represents dependencies and relationships amongst PSFs for HEP evaluation during normal NPP operational states. The model is built taking into consideration the dependencies among PSFs and thus eliminating overlap. The use of an interdependent model of PSFs is expected to produce more accurate HEPs compared to other current methods. PSF sets produced in this study can be further used as nodes (variables) and directed arcs (causal influence between nodes) in HEP evaluation methods such as Bayesian belief (BN) networks. This study was done to estimate the relationships

  20. Simulation-based Assessment to Reliably Identify Key Resident Performance Attributes.

    Science.gov (United States)

    Blum, Richard H; Muret-Wagstaff, Sharon L; Boulet, John R; Cooper, Jeffrey B; Petrusa, Emil R; Baker, Keith H; Davidyuk, Galina; Dearden, Jennifer L; Feinstein, David M; Jones, Stephanie B; Kimball, William R; Mitchell, John D; Nadelberg, Robert L; Wiser, Sarah H; Albrecht, Meredith A; Anastasi, Amanda K; Bose, Ruma R; Chang, Laura Y; Culley, Deborah J; Fisher, Lauren J; Grover, Meera; Klainer, Suzanne B; Kveraga, Rikante; Martel, Jeffrey P; McKenna, Shannon S; Minehart, Rebecca D; Mitchell, John D; Mountjoy, Jeremi R; Pawlowski, John B; Pilon, Robert N; Shook, Douglas C; Silver, David A; Warfield, Carol A; Zaleski, Katherine L

    2018-04-01

    Obtaining reliable and valid information on resident performance is critical to patient safety and training program improvement. The goals were to characterize important anesthesia resident performance gaps that are not typically evaluated, and to further validate scores from a multiscenario simulation-based assessment. Seven high-fidelity scenarios reflecting core anesthesiology skills were administered to 51 first-year residents (CA-1s) and 16 third-year residents (CA-3s) from three residency programs. Twenty trained attending anesthesiologists rated resident performances using a seven-point behaviorally anchored rating scale for five domains: (1) formulate a clear plan, (2) modify the plan under changing conditions, (3) communicate effectively, (4) identify performance improvement opportunities, and (5) recognize limits. A second rater assessed 10% of encounters. Scores and variances for each domain, each scenario, and the total were compared. Low domain ratings (1, 2) were examined in detail. Interrater agreement was 0.76; reliability of the seven-scenario assessment was r = 0.70. CA-3s had a significantly higher average total score (4.9 ± 1.1 vs. 4.6 ± 1.1, P = 0.01, effect size = 0.33). CA-3s significantly outscored CA-1s for five of seven scenarios and domains 1, 2, and 3. CA-1s had a significantly higher proportion of worrisome ratings than CA-3s (chi-square = 24.1, P < 0.01, effect size = 1.50). Ninety-eight percent of residents rated the simulations more educational than an average day in the operating room. Sensitivity of the assessment to CA-1 versus CA-3 performance differences for most scenarios and domains supports validity. No differences, by experience level, were detected for two domains associated with reflective practice. Smaller score variances for CA-3s likely reflect a training effect; however, worrisome performance scores for both CA-1s and CA-3s suggest room for improvement.

  1. Improving motor reliability in nuclear power plants: Volume 1, Performance evaluation and maintenance practices

    International Nuclear Information System (INIS)

    Subudhi, M.; Gunther, W.E.; Taylor, J.H.; Sugarman, A.C.; Sheets, M.W.

    1987-11-01

    This report constitutes the first of the three volumes under this NUREG. The report presents recommendations for developing a cost-effective program for performance evaluation and maintenance of electric motors in nuclear power plants. These recommendations are based on current industry practices, available techniques for monitoring degradation in motor components, manufacturer's recommendations, operating experience, and results from two laboratory tests on aged motors. Two laboratory test reports on a small and a large motor are presented in separate volumes of this NUREG. These provide the basis for the various functional indicators recommended for maintenance programs in this report. The overall preventive maintenance program is separated into two broad areas of activity aimed at mitigating the potential effects of equipment aging: Performance Evaluation and Equipment Maintenance. The latter involves actually maintaining the condition of the equipment while the former involves those activities undertaken to monitor degradation due to aging. These monitoring methods are further categorized into periodic testing, surveillance testing, continuous monitoring and inspections. This study focuses on the methods and procedures for performing the above activities to maintain the motors operationally ready in a nuclear facility. This includes an assessment of various functional indicators to determine their suitability for trending to monitor motor component condition. The intrusiveness of test methods and the present state-of-the-art for using the test equipment in a plant environment are discussed. In conclusion, implementation of the information provided in this report, will improve motor reliability in nuclear power plants. The study indicates the kinds of tests to conduct, how and when to conduct them, and to which motors the tests should be applied. 44 refs., 12 figs., 13 tabs

  2. Research about reactor operator's personality characteristics and performance

    International Nuclear Information System (INIS)

    Wei Li; He Xuhong; Zhao Bingquan

    2003-01-01

    To predict and evaluate the reactor operator's performance by personality characteristics is an important part of reactor operator safety assessment. Using related psychological theory combined with the Chinese operator's fact and considering the effect of environmental factors to personality analysis, paper does the research about the about the relationships between reactor operator's performance and personality characteristics, and offers the reference for operator's selection, using and performance in the future. (author)

  3. Improving Reliability of High Power Quasi-CW Laser Diode Arrays Operating in Long Pulse Mode

    Science.gov (United States)

    Amzajerdian, Farzin; Meadows, Byron L.; Barnes, Bruce W.; Lockard, George E.; Singh, Upendra N.; Kavaya, Michael J.; Baker, Nathaniel R.

    2006-01-01

    Operating high power laser diode arrays in long pulse regime of about 1 msec, which is required for pumping 2-micron thulium and holmium-based lasers, greatly limits their useful lifetime. This paper describes performance of laser diode arrays operating in long pulse mode and presents experimental data of the active region temperature and pulse-to-pulse thermal cycling that are the primary cause of their premature failure and rapid degradation. This paper will then offer a viable approach for determining the optimum design and operational parameters leading to the maximum attainable lifetime.

  4. Investigation of key parameters for the development of reliable ITER baseline operation scenarios using CORSICA

    Science.gov (United States)

    Kim, S. H.; Casper, T. A.; Snipes, J. A.

    2018-05-01

    ITER will demonstrate the feasibility of burning plasma operation by operating DT plasmas in the ELMy H-mode regime with a high ratio of fusion power gain Q ~ 10. 15 MA ITER baseline operation scenario has been studied using CORSICA, focusing on the entry to burn, flat-top burning plasma operation and exit from burn. The burning plasma operation for about 400 s of the current flat-top was achieved in H-mode within the various engineering constraints imposed by the poloidal field coil and power supply systems. The target fusion gain (Q ~ 10) was achievable in the 15 MA ITER baseline operation with a moderate amount of the total auxiliary heating power (~50 MW). It has been observed that the tungsten (W) concentration needs to be maintained low level (n w/n e up to the order of 1.0  ×  10-5) to avoid the radiative collapse and uncontrolled early termination of the discharge. The dynamic evolution of the density can modify the H-mode access unless the applied auxiliary heating power is significantly higher than the H-mode threshold power. Several qualitative sensitivity studies have been performed to provide guidance for further optimizing the plasma operation and performance. Increasing the density profile peaking factor was quite effective in increasing the alpha particle self-heating power and fusion power multiplication factor. Varying the combination of auxiliary heating power has shown that the fusion power multiplication factor can be reduced along with the increase in the total auxiliary heating power. As the 15 MA ITER baseline operation scenario requires full capacity of the coil and power supply systems, the operation window for H-mode access and shape modification was narrow. The updated ITER baseline operation scenarios developed in this work will become a basis for further optimization studies necessary along with the improvement in understanding the burning plasma physics.

  5. reliability reliability

    African Journals Online (AJOL)

    eobe

    Corresponding author, Tel: +234-703. RELIABILITY .... V , , given by the code of practice. However, checks must .... an optimization procedure over the failure domain F corresponding .... of Concrete Members based on Utility Theory,. Technical ...

  6. 24 CFR 902.43 - Management operations performance standards.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Management operations performance... URBAN DEVELOPMENT PUBLIC HOUSING ASSESSMENT SYSTEM PHAS Indicator #3: Management Operations § 902.43 Management operations performance standards. (a) Management operations sub-indicators. The following sub...

  7. TH-F-209-01: Pitfalls: Reliability and Performance of Diagnostic X-Ray Sources

    International Nuclear Information System (INIS)

    Behling, R.

    2016-01-01

    Purpose: Performance and reliability of medical X-ray tubes for imaging are crucial from an ethical, clinical and economic perspective. This lecture will deliver insight into the aspects to consider during the decision making process to invest in X-ray imaging equipment. Outdated metric still hampers realistic product comparison. It is time to change this and to comply with latest standards, which consider current technology. Failure modes and ways to avoid down-time of the equipment shall be discussed. In view of the increasing number of interventional procedures and the hazards associated with ionizing radiation, toxic contrast agents, and the combination thereof, the aspect of system reliability is of paramount importance. Methods: A comprehensive picture of trends for different modalities (CT, angiography, general radiology) has been drawn and led to the development of novel X-ray tube technology. Results: Recent X-ray tubes feature enhanced reliability and unprecedented performance. Relevant metrics for product comparison still have to be implemented in practice. Conclusion: The speed of scientific and industrial development of new diagnostic and therapeutic X-ray sources remains tremendous. Still, users suffer from gaps between desire and reality in day-to-day diagnostic routine. X-ray sources are still limiting cutting-edge medical procedures. Side-effects of wear and tear, limitations of the clinical work flow, costs, the characteristics of the X-ray spectrum and others topics need to be further addressed. New applications and modalities, like detection-based color-resolved X-ray and phase-contrast / dark-field imaging will impact the course of new developments of X-ray sources. Learning Objectives: Understand the basic requirements on medical diagnostic X-ray sources per modality Learn to select the optimal equipment employing state-of-the-art metric Know causes of failures, depending on the way X-ray sources are operated Understand methods to remediate

  8. TH-F-209-00: Pitfalls: Reliability and Performance of Diagnostic X-Ray Sources

    International Nuclear Information System (INIS)

    2016-01-01

    Purpose: Performance and reliability of medical X-ray tubes for imaging are crucial from an ethical, clinical and economic perspective. This lecture will deliver insight into the aspects to consider during the decision making process to invest in X-ray imaging equipment. Outdated metric still hampers realistic product comparison. It is time to change this and to comply with latest standards, which consider current technology. Failure modes and ways to avoid down-time of the equipment shall be discussed. In view of the increasing number of interventional procedures and the hazards associated with ionizing radiation, toxic contrast agents, and the combination thereof, the aspect of system reliability is of paramount importance. Methods: A comprehensive picture of trends for different modalities (CT, angiography, general radiology) has been drawn and led to the development of novel X-ray tube technology. Results: Recent X-ray tubes feature enhanced reliability and unprecedented performance. Relevant metrics for product comparison still have to be implemented in practice. Conclusion: The speed of scientific and industrial development of new diagnostic and therapeutic X-ray sources remains tremendous. Still, users suffer from gaps between desire and reality in day-to-day diagnostic routine. X-ray sources are still limiting cutting-edge medical procedures. Side-effects of wear and tear, limitations of the clinical work flow, costs, the characteristics of the X-ray spectrum and others topics need to be further addressed. New applications and modalities, like detection-based color-resolved X-ray and phase-contrast / dark-field imaging will impact the course of new developments of X-ray sources. Learning Objectives: Understand the basic requirements on medical diagnostic X-ray sources per modality Learn to select the optimal equipment employing state-of-the-art metric Know causes of failures, depending on the way X-ray sources are operated Understand methods to remediate

  9. TH-F-209-01: Pitfalls: Reliability and Performance of Diagnostic X-Ray Sources

    Energy Technology Data Exchange (ETDEWEB)

    Behling, R. [Philips Medical Systems DMC GmbH (United States)

    2016-06-15

    Purpose: Performance and reliability of medical X-ray tubes for imaging are crucial from an ethical, clinical and economic perspective. This lecture will deliver insight into the aspects to consider during the decision making process to invest in X-ray imaging equipment. Outdated metric still hampers realistic product comparison. It is time to change this and to comply with latest standards, which consider current technology. Failure modes and ways to avoid down-time of the equipment shall be discussed. In view of the increasing number of interventional procedures and the hazards associated with ionizing radiation, toxic contrast agents, and the combination thereof, the aspect of system reliability is of paramount importance. Methods: A comprehensive picture of trends for different modalities (CT, angiography, general radiology) has been drawn and led to the development of novel X-ray tube technology. Results: Recent X-ray tubes feature enhanced reliability and unprecedented performance. Relevant metrics for product comparison still have to be implemented in practice. Conclusion: The speed of scientific and industrial development of new diagnostic and therapeutic X-ray sources remains tremendous. Still, users suffer from gaps between desire and reality in day-to-day diagnostic routine. X-ray sources are still limiting cutting-edge medical procedures. Side-effects of wear and tear, limitations of the clinical work flow, costs, the characteristics of the X-ray spectrum and others topics need to be further addressed. New applications and modalities, like detection-based color-resolved X-ray and phase-contrast / dark-field imaging will impact the course of new developments of X-ray sources. Learning Objectives: Understand the basic requirements on medical diagnostic X-ray sources per modality Learn to select the optimal equipment employing state-of-the-art metric Know causes of failures, depending on the way X-ray sources are operated Understand methods to remediate

  10. TH-F-209-00: Pitfalls: Reliability and Performance of Diagnostic X-Ray Sources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-06-15

    Purpose: Performance and reliability of medical X-ray tubes for imaging are crucial from an ethical, clinical and economic perspective. This lecture will deliver insight into the aspects to consider during the decision making process to invest in X-ray imaging equipment. Outdated metric still hampers realistic product comparison. It is time to change this and to comply with latest standards, which consider current technology. Failure modes and ways to avoid down-time of the equipment shall be discussed. In view of the increasing number of interventional procedures and the hazards associated with ionizing radiation, toxic contrast agents, and the combination thereof, the aspect of system reliability is of paramount importance. Methods: A comprehensive picture of trends for different modalities (CT, angiography, general radiology) has been drawn and led to the development of novel X-ray tube technology. Results: Recent X-ray tubes feature enhanced reliability and unprecedented performance. Relevant metrics for product comparison still have to be implemented in practice. Conclusion: The speed of scientific and industrial development of new diagnostic and therapeutic X-ray sources remains tremendous. Still, users suffer from gaps between desire and reality in day-to-day diagnostic routine. X-ray sources are still limiting cutting-edge medical procedures. Side-effects of wear and tear, limitations of the clinical work flow, costs, the characteristics of the X-ray spectrum and others topics need to be further addressed. New applications and modalities, like detection-based color-resolved X-ray and phase-contrast / dark-field imaging will impact the course of new developments of X-ray sources. Learning Objectives: Understand the basic requirements on medical diagnostic X-ray sources per modality Learn to select the optimal equipment employing state-of-the-art metric Know causes of failures, depending on the way X-ray sources are operated Understand methods to remediate

  11. Improving the Transmission System Reliability for the 154kV Radial Network Operation

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Jin Boo; Yoo, Myeong Ho; Yoon, Young Beum; Kim, Tae Won [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Lee, Gi Won; Chung, Beom Jin; Jung, Jung Won; Park, Kyu Hyun; Lee, Myung Hee; Kim, Hyun Jong; Kim, Chae Hee [KEYIN CO., (Korea, Republic of)

    1996-12-31

    Analyzing that 154kV radial network current ed operated, we developed Automatic Power Reconfiguration System(APRS) which restore blackout area. It consists of special data acquisition system(DAU) and central monitoring system for reason of protecting currently operating power system. In addition, it communicates using optical communication network for high speed data transmission and accuracy. An Accuracy of operation and stability of the developed system is tested using Real Time Digital Simulator in 3-bus equivalent model system. In An Outage case, our developed system can restore a blackout area in three second. An ability of the restoration of a blackout was verified by simulations. For the field test, the developed system was set up at SINCHON S/S, SESOMUN S/S, SINDANG S/S and MAJANG S/S governed by Seoul Power Transmission Center. If the system reliability is proved for a one year test in real power system, application of the system will be extended to the other substations.

  12. Virtualization of Legacy Instrumentation Control Computers for Improved Reliability, Operational Life, and Management.

    Science.gov (United States)

    Katz, Jonathan E

    2017-01-01

    Laboratories tend to be amenable environments for long-term reliable operation of scientific measurement equipment. Indeed, it is not uncommon to find equipment 5, 10, or even 20+ years old still being routinely used in labs. Unfortunately, the Achilles heel for many of these devices is the control/data acquisition computer. Often these computers run older operating systems (e.g., Windows XP) and, while they might only use standard network, USB or serial ports, they require proprietary software to be installed. Even if the original installation disks can be found, it is a burdensome process to reinstall and is fraught with "gotchas" that can derail the process-lost license keys, incompatible hardware, forgotten configuration settings, etc. If you have running legacy instrumentation, the computer is the ticking time bomb waiting to put a halt to your operation.In this chapter, I describe how to virtualize your currently running control computer. This virtualized computer "image" is easy to maintain, easy to back up and easy to redeploy. I have used this multiple times in my own lab to greatly improve the robustness of my legacy devices.After completing the steps in this chapter, you will have your original control computer as well as a virtual instance of that computer with all the software installed ready to control your hardware should your original computer ever be decommissioned.

  13. Architectural design and reliability analysis of a fail-operational brake-by-wire system from ISO 26262 perspectives

    International Nuclear Information System (INIS)

    Sinha, Purnendu

    2011-01-01

    Next generation drive-by-wire automotive systems enabling autonomous driving will build on the fail-operational capabilities of electronics, control and software (ECS) architectural solutions. Developing such architectural designs that would meet dependability requirements and satisfy other system constraints is a challenging task and will possibly lead to a paradigm shift in automotive ECS architecture design and development activities. This aspect is becoming quite relevant while designing battery-driven electric vehicles with integrated in-wheel drive-train and chassis subsystems. In such highly integrated dependable systems, many of the primary features and functions are attributed to the highest safety critical ratings. Brake-by-wire is one such system that interfaces with active safety features built into an automobile, and which in turn is expected to provide fail-operational capabilities. In this paper, building up on the basic concepts of fail-silent and fail-operational systems design we propose a system-architecture for a brake-by-wire system with fail-operational capabilities. The design choices are supported with proper rationale and design trade-offs. Safety and reliability analysis of the proposed system architecture is performed as per the ISO 26262 standard for functional safety of electrical/electronic systems in road vehicles.

  14. Reliability modeling of degradation of products with multiple performance characteristics based on gamma processes

    International Nuclear Information System (INIS)

    Pan Zhengqiang; Balakrishnan, Narayanaswamy

    2011-01-01

    Many highly reliable products usually have complex structure, with their reliability being evaluated by two or more performance characteristics. In certain physical situations, the degradation of these performance characteristics would be always positive and strictly increasing. In such a case, the gamma process is usually considered as a degradation process due to its independent and non-negative increments properties. In this paper, we suppose that a product has two dependent performance characteristics and that their degradation can be modeled by gamma processes. For such a bivariate degradation involving two performance characteristics, we propose to use a bivariate Birnbaum-Saunders distribution and its marginal distributions to approximate the reliability function. Inferential method for the corresponding model parameters is then developed. Finally, for an illustration of the proposed model and method, a numerical example about fatigue cracks is discussed and some computational results are presented.

  15. Nuclear power plant safety and reliability improvements derived from operational experience analysis

    International Nuclear Information System (INIS)

    Zebroski, E.L.; Rosen, S.L.

    1983-01-01

    The frequency and distribution of significant events at operating nuclear power plants can be used as one of several indices to obtain a preliminary indication of unit and/or utility performance in the development and implementation of improvements aimed at reducing the probability or consequences of troublesome events. Initial data of this type are presented along with qualifications on the validity of such indicators. Planned further steps to improve this as a performance indicator are noted

  16. Effect of system workload on operating system reliability - A study on IBM 3081

    Science.gov (United States)

    Iyer, R. K.; Rossetti, D. J.

    1985-01-01

    This paper presents an analysis of operating system failures on an IBM 3081 running VM/SP. Three broad categories of software failures are found: error handling, program control or logic, and hardware related; it is found that more than 25 percent of software failures occur in the hardware/software interface. Measurements show that results on software reliability cannot be considered representative unless the system workload is taken into account. The overall CPU execution rate, although measured to be close to 100 percent most of the time, is not found to correlate strongly with the occurrence of failures. Possible reasons for the observed workload failure dependency, based on detailed investigations of the failure data, are discussed.

  17. Life management and operational experience feedback - tools to enhance safety and reliability of the NPP

    International Nuclear Information System (INIS)

    Mach, P.

    1997-01-01

    Preparation has started of the Temelin power plant centralized equipment database. Principles of reliability centered maintenance are studied, and use of these activities will be made in the Plant Ageing Management Programme. The aims of the Programme are as follows: selection of important components subject to ageing, data collection, determination of dominant stressors, development, selection and validation of ageing evaluation methods, setup of experience feedback, determination of responsibilities, methodologies and strategy, elaboration of programme procedures and documentation, and maintenance of programme flexibility. Pilot studies of component ageing are under way: for the reactor pressure vessel, steam generator, pressurizer, piping, ECCS and cables. The organizational structure of the Operational Experience Feedback system is described, as are the responsibility of staff and sources of information. (M.D.)

  18. Reliability and validity of match performance analysis in soccer : a multidimensional qualitative evaluation of opponent interaction

    OpenAIRE

    Tenga, Albin

    2010-01-01

    Avhandling (doktorgrad) – Norges idrettshøgskole, 2010. Match performance analysis is widely used as a method for studying technical, tactical and physical aspects of player and team performance in a soccer match. Therefore, ensuring the validity and reliability of the collected data is important for match performance analysis to meet its intents and purposes effectively. However, most studies on soccer match performance use unidimensional frequency data based on analyses done ...

  19. Embedded Sensors and Controls to Improve Component Performance and Reliability Conceptual Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Kisner, R.; Melin, A.; Burress, T.; Fugate, D.; Holcomb, D.; Wilgen, J.; Miller, J.; Wilson, D.; Silva, P.; Whitlow, L.; Peretz, F.

    2012-09-15

    The objective of this project is to demonstrate improved reliability and increased performance made possible by deeply embedding instrumentation and controls (I&C) in nuclear power plant (NPP) components and systems. The project is employing a highly instrumented canned rotor, magnetic bearing, fluoride salt pump as its I&C technology demonstration platform. I&C is intimately part of the basic millisecond-by-millisecond functioning of the system; treating I&C as an integral part of the system design is innovative and will allow significant improvement in capabilities and performance. As systems become more complex and greater performance is required, traditional I&C design techniques become inadequate and more advanced I&C needs to be applied. New I&C techniques enable optimal and reliable performance and tolerance of noise and uncertainties in the system rather than merely monitoring quasistable performance. Traditionally, I&C has been incorporated in NPP components after the design is nearly complete; adequate performance was obtained through over-design. By incorporating I&C at the beginning of the design phase, the control system can provide superior performance and reliability and enable designs that are otherwise impossible. This report describes the progress and status of the project and provides a conceptual design overview for the platform to demonstrate the performance and reliability improvements enabled by advanced embedded I&C.

  20. The Reliability of In-Training Assessment when Performance Improvement Is Taken into Account

    Science.gov (United States)

    van Lohuizen, Mirjam T.; Kuks, Jan B. M.; van Hell, Elisabeth A.; Raat, A. N.; Stewart, Roy E.; Cohen-Schotanus, Janke

    2010-01-01

    During in-training assessment students are frequently assessed over a longer period of time and therefore it can be expected that their performance will improve. We studied whether there really is a measurable performance improvement when students are assessed over an extended period of time and how this improvement affects the reliability of the…

  1. LONG-RUN OPERATING PERFORMANCE OF PREFERRED STOCK ISSUERS

    OpenAIRE

    Devrim Yaman

    2011-01-01

    In this paper, we study the long-run operating performance of preferred stock issuers. We use three different measures of operating performance; pre-tax cash flows, profit margin and return on assets. We study the performance of industrial firms, financial firms, and utilities separately, as well as the performance of the whole sample. Our results indicate that the operating performance of preferred stock issuers as a whole declines in the three-years before the issue. We find that profitabil...

  2. Human Error Probabilites (HEPs) for generic tasks and Performance Shaping Factors (PSFs) selected for railway operations

    DEFF Research Database (Denmark)

    Thommesen, Jacob; Andersen, Henning Boje

    This report describes an HRA (Human Reliability Assessment) of six generic tasks and four Perfor-mance Shaping Factors (PSFs) targeted at railway operations commissioned by Banedanmark. The selection and characterization of generic tasks and PSFs are elaborated by DTU Management in close...

  3. Performance and Reliability of Bonded Interfaces for High-Temperature Packaging. Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    DeVoto, Douglas [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-01

    Current generation automotive power electronics packages utilize silicon devices and lead-free solder alloys. To meet stringent technical targets for 2020 and beyond (for cost, power density, specific power, efficiency and reliability), wide-bandgap devices are being considered since they offer advantages such as operation at higher frequencies, voltages, and temperatures. Traditional power electronics packages must be redesigned to utilize the full potential of wide-bandgap devices, and the die- and substrate-attach layers are key areas where new material development and validation is required. Present solder alloys do not meet the performance requirements for these new package designs while also meeting cost and hazardous substance restrictions. Sintered silver (Ag) promises to meet the needs for die- and substrate-attach interfaces but synthesis optimization and reliability evaluation must be completed. Sintered Ag material was proposed as an alternative solution in power electronics packages almost 20 years back. However, synthesis pressure requirements up 40 MPa caused a higher complexity in the production process and more stringent flatness specifications for the substrates. Recently, several manufacturers have developed sintered Ag materials that require lower (3-5 MPa) or even no bonding pressures. Degradation mechanisms for these sintered Ag materials are not well known and need to be addressed. We are addressing these aspects to some extent in this project. We are developing generalized (i.e., independent of geometry) stress intensity factor versus cycles-to-failure relations for sintered Ag. Because sintered Ag is a relatively new material for automotive power electronics, the industry currently does not have a good understanding of recommended synthesis parameters or expected reliability under prescribed conditions. It is an important deliverable of this project to transfer findings to industry to eliminate barriers to using sintered Ag as a viable and

  4. Reliability and Validity of the Turkish Version of the Job Performance Scale Instrument.

    Science.gov (United States)

    Harmanci Seren, Arzu Kader; Tuna, Rujnan; Eskin Bacaksiz, Feride

    2018-02-01

    Objective measurement of the job performance of nursing staff using valid and reliable instruments is important in the evaluation of healthcare quality. A current, valid, and reliable instrument that specifically measures the performance of nurses is required for this purpose. The aim of this study was to determine the validity and reliability of the Turkish version of the Job Performance Instrument. This study used a methodological design and a sample of 240 nurses working at different units in four hospitals in Istanbul, Turkey. A descriptive data form, the Job Performance Scale, and the Employee Performance Scale were used to collect data. Data were analyzed using IBM SPSS Statistics Version 21.0 and LISREL Version 8.51. On the basis of the data analysis, the instrument was revised. Some items were deleted, and subscales were combined. The Turkish version of the Job Performance Instrument was determined to be valid and reliable to measure the performance of nurses. The instrument is suitable for evaluating current nursing roles.

  5. Evaluation of the diagnostic performance and operational ...

    African Journals Online (AJOL)

    The objectives of the study were (i) to assess the sensitivity and specificity of four on site rapid tests in comparison with Treponema pallidum haemagglutination assay (TPHA) as a gold standard and (ii) to evaluate the operational characteristics of those tests among health workers in a maternity unit. Methods: Four rapid ...

  6. High-Performance Operational and Instrumentation Amplifiers

    NARCIS (Netherlands)

    Shahi, B.

    2015-01-01

    This thesis describes techniques to reduce the offset error in precision instrumentation and operational amplifiers. The offset error which is considered a major error source associated with gain blocks, together with other errors are reviewed. Conventional and newer approaches to remove offset and

  7. Design of thermoelectric modules for both mechanical reliability and performance using FE simulation

    DEFF Research Database (Denmark)

    Sarhadi, Ali; Bjørk, Rasmus; Pryds, Nini

    for these two objectives. The current study deals with FE simulation of the TE modules to optimize their geometrical dimension in terms of mechanical reliability and performance. First, FE simulation of a TE module consisting of bismuth telluride alloys is carried out and the induced thermal stresses, output......, the geometrical dimensions of the TE elements for both mechanical reliability and performance are optimized to obtain a compromise design. The present work provides a basis for optimizing the TE modules in terms of their life time and performance.......Thermo-mechanical modeling of the TE modules provides an efficient tool for assessing the mechanical strength of the modules against the induced thermal stresses and subsequently optimizing them in terms of the mechanical reliability. However, the design of TE modules in terms of mechanical...

  8. Developing reliable safeguards seals for application verification and removal by State operators

    Energy Technology Data Exchange (ETDEWEB)

    Finch, Robert J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Smartt, Heidi A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Haddal, Risa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    Once a geological repository has begun operations, the encapsulation and disposal of spent fuel will be performed as a continuous, industrial-scale series of processes, during which time safeguards seals will be applied to transportation casks before shipment from an encapsulation plant, and then verified and removed following receipt at the repository. These operations will occur approximately daily during several decades of Sweden's repository operation; however, requiring safeguards inspectors to perform the application, verification, and removal of every seal would be an onerous burden on International Atomic Energy Agency's (IAEA's) resources. Current IAEA practice includes allowing operators to either apply seals or remove them, but not both, so the daily task of either applying or verifying and removing would still require continuous presence of IAEA inspectors at one site at least. Of special importance is the inability to re-verify cask or canisters from which seals have been removed and the canisters emplaced underground. Successfully designing seals that can be applied, verified and removed by an operator with IAEA approval could impact more than repository shipments, but other applications as well, potentially reducing inspector burdens for a wide range of such duties.

  9. A criterion of the performance of thermometric systems of high metrological reliability

    International Nuclear Information System (INIS)

    Sal'nikov, N.L.; Filimonov, E.V.

    1995-01-01

    Monitoring temperature regimes is an important part of ensuring the operational safety of a nuclear power plant. Therefore, high standards are imposed upon the reliability of the primary information on the heat field of the object obtained from different sensors, and it is urgent to develop methods of evaluating the metrological reliability of these sensors. THe main sources of thermometric information at nuclear power plants are contact temperature sensors, the most widely used of these being thermoelectric converters (TEC) and thermal resistance converters (TRC)

  10. REMOTES: reliable and modular telescope solution for seamless operation and monitoring of various observation facilities

    Science.gov (United States)

    Jakubec, M.; Skala, P.; Sedlacek, M.; Nekola, M.; Strobl, J.; Blazek, M.; Hudec, R.

    2012-09-01

    Astronomers often need to put several pieces of equipment together and have to deploy them at a particular location. This task could prove to be a really tough challenge, especially for distant observing facilities with intricate operating conditions, poor communication infrastructure and unreliable power source. To have this task even more complicated, they also expect secure and reliable operation in both attended and unattended mode, comfortable software with user-friendly interface and full supervision over the observation site at all times. During reconstruction of the D50 robotic telescope facility, we faced many of the issues mentioned above. To get rid of them, we based our solution on a flexible group of hardware modules controlling the equipment of the observation site, connected together by the Ethernet network and orchestrated by our management software. This approach is both affordable and powerful enough to fulfill all of the observation requirements at the same time. We quickly figured out that the outcome of this project could also be useful for other observation facilities, because they are probably facing the same issues we have solved during our project. In this contribution, we will point out the key features and benefits of the solution for observers. We will demonstrate how the solution works at our observing location. We will also discuss typical management and maintenance scenarios and how we have supported them in our solution. Finally, the overall architecture and technical aspects of the solution will be presented and particular design and technology decisions will be clarified.

  11. Human reliability analysis in support of a level 1 PRA for Surry during midloop operations

    International Nuclear Information System (INIS)

    Lin, J.C.; Bley, D.C.; Chu, T.-L.

    2004-01-01

    The objectives of this Level 1 probabilistic risk assessment (PRA) are to evaluate the important accident sequences initiated during midloop operations and to compare the qualitative and quantitative results with those for accidents initiated during power operations. The primary types of human actions analyzed in this study involve the dynamic operator actions and recovery actions that take place during the accident sequence following an initiating event. Two parts of the human actions were analyzed: failure to diagnose and failure to perform the action. The scope of the Level 1 PRA for Surry during midloop operations includes internal, fire, and flood initiating events. The major categories of dynamic operator actions taken during the accident sequence following an initiating event are: providing makeup to the reactor coolant system (RCS), restoring residual heat removal (RHR) cooling, establishing steam generator reflux cooling, establishing primary feed and spill, establishing gravity feed from refueling water storage tank (RWST), establishing high pressure recirculation, establishing recirculation spray, and cross-connecting RWSTs. All categories are not applicable to all initiating events and all plant operating states (POS). (author)

  12. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  13. Development of reliability database for safety-related I and C component based on operating experience of KSNP

    International Nuclear Information System (INIS)

    Jang, S. C.; Han, S. H.; Min, K. R.

    2001-01-01

    Reliability database for safety-related I and C components has been developed, based on domestic operating experience of total 8.63 years from four units-Yonggwang Units 3 and 4, and Ulchin Units 3 and 4. This plant-specific data of safety-related I and C components has compared with operating experience for CE-supplied plants in U.S.A. As a results, we found that on the whole the domestic reliability data was similar to CE-supplied plants in USA, through lots of failures occurred early in the commercial operation were included in our analyses without percolation

  14. Device Performance and Reliability Improvements of AlGaBN/GaN/Si MOSFET

    Science.gov (United States)

    2016-02-04

    AFRL-AFOSR-JP-TR-2016-0037 Device Performance and Reliablity Improvements of AlGaBN/GaN/Si MOSFET Robert Wallace UNIVERSITY OF TEXAS AT DALLAS Final...GaN/Si MOSFET 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA2386-14-1-4069 5c.  PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) Robert Wallace 5d.  PROJECT...AOARD Grant FA2386-14-1-4069 Device Performance and Reliability Improvements of AlGaN/GaN/Si MOSFET US 12 month extension (2014 – 2015) for current

  15. The ATLAS semiconductor tracker: operations and performance

    CERN Document Server

    D'Auria, S; The ATLAS collaboration

    2012-01-01

    The Semi-Conductor Tracker (SCT) is a silicon strip detector and one of the key precision tracking devices in the Inner Detector of the ATLAS experiment at CERN LHC. The SCT is constructed of 4088 silicon detector modules for a total of 6.3 million strips. Each module is designed, constructed and tested to operate as a stand-alone unit, mechanically, electrically, optically and thermally. The modules are mounted into two types of structures: one barrel (4 cylinders) and two end-cap systems (9 disks on each end of the barrel). The SCT silicon micro-strip sensors are processed in the planar {it p}-in-{it n} technology. The signals are processed in the front-end ASICS ABCD3TA, working in binary readout mode. Data is transferred to the off-detector readout electronics via optical fibres. We find 99.3% of the SCT modules are operational, noise occupancy and hit efficiency exceed the design specifications. In the talk the current results from the successful operation of the SCT Detector at the LHC and its status af...

  16. Operating performance of CANDU pressure tubes

    International Nuclear Information System (INIS)

    Cheadle, B.A.; Price, E.G.

    1989-04-01

    The performance of Zircaloy-2 and Zr-2.5 Nb pressure tubes in CANDU reactors is reviewed. The accelerated hydriding of Zircaloy-2 in reducing water chemistries can lower the toughness of this material and it is essential that defect-initiating phenomena, such as hydride blister formation from pressure tube to calandria tube contact, be prevented. Zr-2.5 Nb pressure tubes are performing well with low rates of hydrogen pick-up and good retention of material properties

  17. Investigation of DC-DC Boost Converter for Reliability of Operational Planning

    DEFF Research Database (Denmark)

    Khazraj, Hesam; Ashouri, Mani; Silva, Filipe Miguel Faria da

    2018-01-01

    of the interests related to reliability is the power semiconductor switches, which are the most vulnerable elements. The failure of one-power switches can reduce the system reliability. Interleaved technique for DC-DC converters is a redundant strategy to improve the reliability, but at the cost of increasing...

  18. Assessments and applications to enhance human reliability and reduce risk during less-than-full-power operations

    International Nuclear Information System (INIS)

    Hannaman, G.W.; Singh, A.

    1992-01-01

    Study of events, interviews with plant personnel, and applications of risk studies indicate that the risk of a potential accident during less-than-full-power (LTFP) operation is becoming a greater fraction of the risk as improvements are made to the full-power operations. Industry efforts have been increased to reduce risk and the cost of shutdown operations. These efforts consider the development and application of advanced tools to help utilities proactively identify issues and develop contingencies and interventions to enhance reliability and reduce risk of low-power operations at nuclear power plants. The role for human reliability assessments is to help improve utility outage planning to better achieve schedule and risk control objectives. Improvements are expected to include intervention tools to identify and reduce human error, definition of new instructional modules, and prioritization of risk reduction issues for operators. The Electric Power Research Institute is sponsoring a project to address the identification and quantification of factors that affect human reliability during LTFP operation of nuclear power plants. The results of this project are expected to promote the development of proactively applied interventions and contingencies for enhanced human reliability during shutdown operations

  19. Bag filters at biofuelled plants, reliability and economy of operation; Slangfilter vid bioeldade anlaeggningar, tillfoerlitlighet och driftsekonomi

    Energy Technology Data Exchange (ETDEWEB)

    Lindau, Leif [SYCON Energikonsult, Malmoe (Sweden)

    2002-04-01

    The background to this work is the increased requirements on dust emission control for smaller (2-50 MW) biofuel plants in Sweden, where established technology consisting of multi cyclones cannot meet the emission demands, and where the specific cost of the large scale established technology (electrostatic precipitators) quickly increases with decreased plant size. Operational experience of bag filters on Swedish biofuel plants down to a size of 2 MW has been collected. The operational experience is remarkably uniform and positive and availability is high. Bag life, being the most important operational cost factor, is between two and eleven years. Most frequent material used is aramide, but also PPS is employed and the experience of both materials is good. The cost relation between bag filter (including an upstream skimmer) and electrostatic precipitator has been studied based on supplier quotations. Bag filter always has the lowest first cost. At one year bag life, the total cost of a bag filter is less than that for an electrostatic precipitator for plants smaller than 15 MW, and at more than one year's bag life, the bag filter has the lowest total cost for plants up to 50 MW. For plants smaller than 5-10 MW, the difference in total cost is very high. With some simple means for quality assurance of new bags, premature failure rate can be reduced. Following up cleaning interval and/or emission during operation time, gives information about the development of bag condition and necessary bag change can be foreseen. Since bag filters are more prone to damage by fire than electrostatic precipitators, the process of damage due to entrained sparks has been analysed based on practical observations and a thermal calculation. This consideration shows that this damage mode can be eliminated by an upstream skimmer having moderate but reliable performance. The result is well in coherence with the practical operational experience found that with an adequate skimmer

  20. Materials performance in operating PWR steam generators

    International Nuclear Information System (INIS)

    Weeks, J.R.

    1975-01-01

    The Inconel-600 tubing in operating PWR steam generators has developed leaks due to intergranular stress corrosion cracking or a general wastage attack, originating from the secondary side of the tubing. Corrosion has been limited to those areas of the steam generators where limited coolant circulation and high heat flux have caused impurities to concentrate. Wastage or pitting attack has always been associated with local concentration of sodium hydrogen phosphates, whereas stress corrosion has been associated with local concentration of sodium or potassium hydroxides. The only instance of stress corrosion originating from the primary side occurred on cold-worked tubing when hydrogen was not added to getter oxygen, and LiOH was not added to raise the pH of the primary coolant. All PWR manufacturers are now recommending that the phosphate treatment of the secondary coolant be abandoned in favor of an all-volatile treatment. Experience in operating plants has shown, however, that removal of phosphate-rich sludge deposits is difficult, and that further wastage and/or intergranular stress corrosion may develop; the residual sodium phosphates gradually convert by reaction with corrosion product hydroxides to sodium hydroxide, which remains concentrated in the limited flow areas. Improvements in circulation patterns have been achieved by inserting flow baffles in some PWR steam generators. Inservice monitoring by eddy current techniques is useful for detecting corrosion-induced defects in the tubing, but irreproducibility in field examinations can lead to uncertainties interpreting the results. (U.S.)

  1. Performance Measurement in Helicopter Training and Operations.

    Science.gov (United States)

    Prophet, Wallace W.

    For almost 15 years, HumRRO Division No. 6 has conducted an active research program on techniques for measuring the flight performance of helicopter trainees and pilots. This program addressed both the elemental aspects of flying (i.e., maneuvers) and the mission- or goal-oriented aspects. A variety of approaches has been investigated, with the…

  2. Radon in water aeration system operational performance

    International Nuclear Information System (INIS)

    Lamarre, B.L.

    1990-01-01

    North East Environmental Products, Inc. is a manufacturer of residential scale aeration systems for removal of radon and volatile organic chemicals from private water supplies. This paper is a review of the operational history of residential scale point of entry (POE) radon aeration systems. Emphasis is placed on the difficulties and solutions encountered in actual installations caused by both mechanical difficulties and water quality parameters. A summary of radon reduction efficiency is presented for wells with radon concentrations from 21,000 to 2,600,000 pCi/L. A discussion of customer concerns and attitudes is presented along with other areas for further technical improvement. Training techniques for dealers and installers are also discussed. An update of the current status of the radon in water industry includes current sales volumes as compared to the potential market and an update on the radon in water MCL standard setting process from an industry perspective

  3. Reliability issues and solutions for coding social communication performance in classroom settings.

    Science.gov (United States)

    Olswang, Lesley B; Svensson, Liselotte; Coggins, Truman E; Beilinson, Jill S; Donaldson, Amy L

    2006-10-01

    To explore the utility of time-interval analysis for documenting the reliability of coding social communication performance of children in classroom settings. Of particular interest was finding a method for determining whether independent observers could reliably judge both occurrence and duration of ongoing behavioral dimensions for describing social communication performance. Four coders participated in this study. They observed and independently coded 6 social communication behavioral dimensions using handheld computers. The dimensions were mutually exclusive and accounted for all verbal and nonverbal productions during a specified time frame. The technology allowed for coding frequency and duration for each entered code. Data were collected from 20 different 2-min video segments of children in kindergarten through 3rd-grade classrooms. Data were analyzed for interobserver and intraobserver agreements using time-interval sorting and Cohen's kappa. Further, interval size and total observation length were manipulated to determine their influence on reliability. The data revealed interval sorting and kappa to be a suitable method for examining reliability of occurrence and duration of ongoing social communication behavioral dimensions. Nearly all comparisons yielded medium to large kappa values; interval size and length of observation minimally affected results. Implications The analysis procedure described in this research solves a challenge in reliability: comparing coding by independent observers of both occurrence and duration of behaviors. Results indicate the utility of a new coding taxonomy and technology for application in online observations of social communication in a classroom setting.

  4. PEP-II RF System Operation and Performance

    International Nuclear Information System (INIS)

    McIntosh, P.

    2005-01-01

    The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since July 1998 and have assisted in breaking all design luminosity records back in June 2001. Luminosity on PEP-II has steadily increased since then as a consequence of larger e+ and e- beam currents being accumulated. This has meant that the RF systems have inevitably been driven harder, not only to achieve these higher stored beam currents, but also to reliably keep the beams circulating whilst at the same time minimizing the number of aborts due to RF system faults. This paper details the current PEP-II RF system configurations for both rings, as well as future upgrade plans spanning the next 3-5 years. Limitations of the current RF system configurations are presented, highlighting improvement projects which will target specific areas within the RF systems to ensure that adequate operating overheads are maintained and reliable operation is assured. The Low Energy Ring (LER) and High Energy Ring (HER) RF systems have operated now on PEP-II since July 1998 and have assisted in breaking all design luminosity records back in June 2001. Luminosity on PEP-II has steadily increased since then as a consequence of larger e+ and e- beam currents being accumulated. This has meant that the RF systems have inevitably been driven harder, not only to achieve these higher stored beam currents, but also to reliably keep the beams circulating whilst at the same time minimizing the number of aborts due to RF system faults. This paper details the current PEP-II RF system configurations for both rings, as well as future upgrade plans spanning the next 3-5 years. Limitations of the current RF system configurations are presented, highlighting improvement projects which will target specific areas within the RF systems to ensure that adequate operating overheads are maintained and reliable operation is assured

  5. Advanced control rooms and crew performance issues: Implications for human reliability

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Hall, R.E.

    1991-01-01

    Recent trends in advanced control room (ACR) design are considered with respect to their impact on human performance. It is concluded that potentially negative influences exist, however, a variety of factors make it difficult to model, analyze, and quantify these effects for human reliability analyses (HRAs)

  6. Methodology for performing RF reliability experiments on a generic test structure

    NARCIS (Netherlands)

    Sasse, G.T.; de Vries, Rein J.; Schmitz, Jurriaan

    2007-01-01

    This paper discusses a new technique developed for generating well defined RF large voltage swing signals for on wafer experiments. This technique can be employed for performing a broad range of different RF reliability experiments on one generic test structure. The frequency dependence of a

  7. Influence of test reliability on the screening performance of frequency-doubling perimetry

    NARCIS (Netherlands)

    Heeg, GP; Jansonius, NM

    PURPOSE: To investigate the influence of test reliability on the screening performance of frequency,doubling perimetry (FDT). DESIGN: Cross-sectional study. METHODS: FDT sensitivity and specificity were calculated three times using three different strategies for handling unreliable (that is, > 0

  8. Reliability assessment of serviceability performance of braced retaining walls using a neural network approach

    Science.gov (United States)

    Goh, A. T. C.; Kulhawy, F. H.

    2005-05-01

    In urban environments, one major concern with deep excavations in soft clay is the potentially large ground deformations in and around the excavation. Excessive movements can damage adjacent buildings and utilities. There are many uncertainties associated with the calculation of the ultimate or serviceability performance of a braced excavation system. These include the variabilities of the loadings, geotechnical soil properties, and engineering and geometrical properties of the wall. A risk-based approach to serviceability performance failure is necessary to incorporate systematically the uncertainties associated with the various design parameters. This paper demonstrates the use of an integrated neural network-reliability method to assess the risk of serviceability failure through the calculation of the reliability index. By first performing a series of parametric studies using the finite element method and then approximating the non-linear limit state surface (the boundary separating the safe and failure domains) through a neural network model, the reliability index can be determined with the aid of a spreadsheet. Two illustrative examples are presented to show how the serviceability performance for braced excavation problems can be assessed using the reliability index.

  9. A method to evaluate performance reliability of individual subjects in laboratory research applied to work settings.

    Science.gov (United States)

    1978-10-01

    This report presents a method that may be used to evaluate the reliability of performance of individual subjects, particularly in applied laboratory research. The method is based on analysis of variance of a tasks-by-subjects data matrix, with all sc...

  10. The Effect of Instrument-Specific Rater Training on Interrater Reliability and Counseling Skills Performance Differentiation

    Science.gov (United States)

    Meacham, Paul Douglas, Jr.

    2013-01-01

    The purpose of this study was to explore the effect of instrument-specific rater training on interrater reliability (IRR) and counseling skills performance differentiation. Strong IRR is of primary concern to effective program evaluation (McCullough, Kuhn, Andrews, Valen, Hatch, & Osimo, 2003; Schanche, Nielsen, McCullough, Valen, &…

  11. THERMAL AND THERMO-MECHANICAL CHARACTERISTICS OF CRYOGENIC MICROCOOLER FOR OPTIMUM PERFORMANCE AND RELIABILITY

    Science.gov (United States)

    2017-10-19

    reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of...contracted fundamental research deemed exempt from public affairs security and policy review in accordance with SAF/AQR memorandum dated 10 Dec 08 and AFRL...subjected to cryogenic operating conditions was assessed by proposing a hierarchical physics -of-failure-based reliability assessment model. 15. SUBJECT

  12. Control room human engineering influences on operator performance

    International Nuclear Information System (INIS)

    Finlayson, F.C.

    1977-01-01

    Three general groups of factors influence operator performance in fulfilling their responsibilities in the control room: (1) control room and control system design, informational data displays (operator inputs) as well as control board design (for operator output); (2) operator characteristics, including those skills, mental, physical, and emotional qualities which are functions of operator selection, training, and motivation; (3) job performance guides, the prescribed operating procedures for normal and emergency operations. This paper presents some of the major results of an evaluation of the effect of human engineering on operator performance in the control room. Primary attention is given to discussion of control room and control system design influence on the operator. Brief observations on the influences of operator characteristics and job performance guides (operating procedures) on performance in the control room are also given. Under the objectives of the study, special emphasis was placed on the evaluation of the control room-operator relationships for severe emergency conditions in the power plant. Consequently, this presentation is restricted largely to material related to emergency conditions in the control room, though it is recognized that human engineering of control systems is of equal (or greater) importance for many other aspects of plant operation

  13. Performance Support Tools for Space Medical Operations

    Science.gov (United States)

    Byrne, Vicky E.; Schmidt, Josef; Barshi, Immanuel

    2009-01-01

    The early Constellation space missions are expected to have medical capabilities very similar to those currently on the Space Shuttle and International Space Station (ISS). For Crew Exploration Vehicle (CEV) missions to ISS, medical equipment will be located on ISS, and carried into CEV in the event of an emergency. Flight Surgeons (FS) on the ground in Mission Control will be expected to direct the Crew Medical Officer (CMO) during medical situations. If there is a loss of signal and the crew is unable to communicate with the ground, a CMO would be expected to carry out medical procedures without the aid of a FS. In these situations, performance support tools can be used to reduce errors and time to perform emergency medical tasks. Human factors personnel at Johnson Space Center have recently investigated medical performance support tools for CMOs on-orbit, and FSs on the ground. This area of research involved the feasibility of Just-in-time (JIT) training techniques and concepts for real-time medical procedures. In Phase 1, preliminary feasibility data was gathered for two types of prototype display technologies: a hand-held PDA, and a Head Mounted Display (HMD). The PDA and HMD were compared while performing a simulated medical procedure using ISS flight-like medical equipment. Based on the outcome of Phase 1, including data on user preferences, further testing was completed using the PDA only. Phase 2 explored a wrist-mounted PDA, and compared it to a paper cue card. For each phase, time to complete procedures, errors, and user satisfaction were captured. Information needed by the FS during ISS mission support, especially for an emergency situation (e.g. fire onboard ISS), may be located in many different places around the FS s console. A performance support tool prototype is being developed to address this issue by bringing all of the relevant information together in one place. The tool is designed to include procedures and other information needed by a FS

  14. Effect of Sensors on the Reliability and Control Performance of Power Circuits in the Web of Things (WoT

    Directory of Open Access Journals (Sweden)

    Sungwoo Bae

    2016-09-01

    Full Text Available In order to realize a true WoT environment, a reliable power circuit is required to ensure interconnections among a range of WoT devices. This paper presents research on sensors and their effects on the reliability and response characteristics of power circuits in WoT devices. The presented research can be used in various power circuit applications, such as energy harvesting interfaces, photovoltaic systems, and battery management systems for the WoT devices. As power circuits rely on the feedback from voltage/current sensors, the system performance is likely to be affected by the sensor failure rates, sensor dynamic characteristics, and their interface circuits. This study investigated how the operational availability of the power circuits is affected by the sensor failure rates by performing a quantitative reliability analysis. In the analysis process, this paper also includes the effects of various reconstruction and estimation techniques used in power processing circuits (e.g., energy harvesting circuits and photovoltaic systems. This paper also reports how the transient control performance of power circuits is affected by sensor interface circuits. With the frequency domain stability analysis and circuit simulation, it was verified that the interface circuit dynamics may affect the transient response characteristics of power circuits. The verification results in this paper showed that the reliability and control performance of the power circuits can be affected by the sensor types, fault tolerant approaches against sensor failures, and the response characteristics of the sensor interfaces. The analysis results were also verified by experiments using a power circuit prototype.

  15. ARIES nondestructive assay system operation and performance

    International Nuclear Information System (INIS)

    Cremers, Teresa L.; Hansen, Walter J.; Herrera, Gary D.; Nelson, David C.; Sampson, Thomas E.; Scheer, Nancy L.

    2000-01-01

    The ARIES (Advanced Recovery and Integrated Extraction System) Project is an integrated system at the Los Alamos Plutonium Facility for the dismantlement of nuclear weapons. The plutonium produced by the ARIES process was measured by an integrated nondestructive assay (NDA) system. The performance of the NDA systems was monitored by a measurement control program which is a part of a nuclear material control and accountability system. In this paper we will report the results of the measurements of the measurement control standards as well as an overview of the measurement of the ARIES process materials

  16. UAV Research at NASA Langley: Towards Safe, Reliable, and Autonomous Operations

    Science.gov (United States)

    Davila, Carlos G.

    2016-01-01

    Unmanned Aerial Vehicles (UAV) are fundamental components in several aspects of research at NASA Langley, such as flight dynamics, mission-driven airframe design, airspace integration demonstrations, atmospheric science projects, and more. In particular, NASA Langley Research Center (Langley) is using UAVs to develop and demonstrate innovative capabilities that meet the autonomy and robotics challenges that are anticipated in science, space exploration, and aeronautics. These capabilities will enable new NASA missions such as asteroid rendezvous and retrieval (ARRM), Mars exploration, in-situ resource utilization (ISRU), pollution measurements in historically inaccessible areas, and the integration of UAVs into our everyday lives all missions of increasing complexity, distance, pace, and/or accessibility. Building on decades of NASA experience and success in the design, fabrication, and integration of robust and reliable automated systems for space and aeronautics, Langley Autonomy Incubator seeks to bridge the gap between automation and autonomy by enabling safe autonomous operations via onboard sensing and perception systems in both data-rich and data-deprived environments. The Autonomy Incubator is focused on the challenge of mobility and manipulation in dynamic and unstructured environments by integrating technologies such as computer vision, visual odometry, real-time mapping, path planning, object detection and avoidance, object classification, adaptive control, sensor fusion, machine learning, and natural human-machine teaming. These technologies are implemented in an architectural framework developed in-house for easy integration and interoperability of cutting-edge hardware and software.

  17. Summary of the Optics, IR, Injection, Operations, Reliability and Instrumentation Working Group

    International Nuclear Information System (INIS)

    Wienands, U.

    2012-01-01

    The facilities reported on are all in a fairly mature state of operation, as evidenced by the very detailed studies and correction schemes that all groups are working on. First- and higher-order aberrations are diagnosed and planned to be corrected. Very detailed beam measurements are done to get a global picture of the beam dynamics. More than other facilities the high-luminosity colliders are struggling with experimental background issues, mitigation of which is a permanent challenge. The working group dealt with a very wide rage of practical issues which limit performance of the machines and compared their techniques of operations and their performance. We anticipate this to be a first attempt. In a future workshop in this series, we propose to attempt more fundamental comparisons of each machine, including design parameters. For example, DAPHNE and KEKB employ a finite crossing angle. The minimum value of β* y attainable at KEKB seems to relate to this scheme. Effectiveness of compensation solenoids and turn-by-turn BPMs etc. should be examined in more detail. In the near future, CESR-C and VEPP-2000 will start their operation. We expect to hear important new experiences from these machines; in particular VEPP-2000 will be the first machine to have adopted round beams. At SLAC and KEK, next generation B Factories are being considered. It will be worthwhile to discuss the design issues of these machines based on the experiences of the existing factory machines.

  18. Assessment of Equipment Capability to Perform Reliably under Severe Accident Conditions

    International Nuclear Information System (INIS)

    2017-07-01

    The experience from the last 40 years has shown that severe accidents can subject electrical and instrumentation and control (I&C) equipment to environmental conditions exceeding the equipment’s original design basis assumptions. Severe accident conditions can then cause rapid degradation or damage to various degrees up to complete failure of such equipment. This publication provides the technical basis to consider when assessing the capability of electrical and I&C equipment to perform reliably during a severe accident. It provides examples of calculation tools to determine the environmental parameters as well as examples and methods that Member States can apply to assess equipment reliability.

  19. Feasibility and Inter-Rater Reliability of Physical Performance Measures in Acutely Admitted Older Medical Patients

    DEFF Research Database (Denmark)

    Bodilsen, Ann Christine; Juul-Larsen, Helle Gybel; Petersen, Janne

    2015-01-01

    OBJECTIVE: Physical performance measures can be used to predict functional decline and increased dependency in older persons. However, few studies have assessed the feasibility or reliability of such measures in hospitalized older patients. Here we assessed the feasibility and inter-rater reliabi......OBJECTIVE: Physical performance measures can be used to predict functional decline and increased dependency in older persons. However, few studies have assessed the feasibility or reliability of such measures in hospitalized older patients. Here we assessed the feasibility and inter......-rater reliability of four simple measures of physical performance in acutely admitted older medical patients. DESIGN: During the first 24 hours of hospitalization, the following were assessed twice by different raters in 52 (≥ 65 years) patients admitted for acute medical illness: isometric hand grip strength, 4......, and 30-s chair stand were 8%, 7%, and 18%, and the SRD95% values were 22%, 17%, and 49%. CONCLUSION: In acutely admitted older medical patients, grip strength, gait speed, and the Cumulated Ambulation Score measurements were feasible and showed high inter-rater reliability when administered by different...

  20. Operator performance evaluation using multi criteria decision making methods

    Science.gov (United States)

    Rani, Ruzanita Mat; Ismail, Wan Rosmanira; Razali, Siti Fatihah

    2014-06-01

    Operator performance evaluation is a very important operation in labor-intensive manufacturing industry because the company's productivity depends on the performance of its operators. The aims of operator performance evaluation are to give feedback to operators on their performance, to increase company's productivity and to identify strengths and weaknesses of each operator. In this paper, six multi criteria decision making methods; Analytical Hierarchy Process (AHP), fuzzy AHP (FAHP), ELECTRE, PROMETHEE II, Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) and VlseKriterijumska Optimizacija I Kompromisno Resenje (VIKOR) are used to evaluate the operators' performance and to rank the operators. The performance evaluation is based on six main criteria; competency, experience and skill, teamwork and time punctuality, personal characteristics, capability and outcome. The study was conducted at one of the SME food manufacturing companies in Selangor. From the study, it is found that AHP and FAHP yielded the "outcome" criteria as the most important criteria. The results of operator performance evaluation showed that the same operator is ranked the first using all six methods.

  1. The impact of lean management implementation on organizational operational performance

    Directory of Open Access Journals (Sweden)

    Hira Hashmi

    2015-12-01

    Full Text Available Background: The research aims to develop the consensus between different operational improvement strategies, to address the relationship between the operational characteristics (lean and operational performance of the organization. Methods: Variables from which the extraction of the outcomes has been established include operational performance, daily schedule adherence, repeat production and flow oriented layout. The technique of data analysis is selected to be Correlation and multiple regressions. The aim for performing these tests is to highlight association of lean strategy with the operational performance. Results and conclusions: The positive association is being established amongst the operational performance and the daily schedule adherence, flow oriented layout and the repeat production. It is suggested to the supply chain management that they must entail their production team for having repetition in their work and become efficient in their production. They must be reached to their optimization level, where they have to extract less waste and have high level of the production.

  2. Reliability problems in the recirculated cooling water system at Cernavoda NPP and corrective maintenance operations adopted

    International Nuclear Information System (INIS)

    Bucur, Ionel; Metes, Mircea

    2002-01-01

    Between February 18 and March 5, 2002 the Unit 1 of Cernavoda NPP was shutdown in an un-planned outage necessary to repair a crack on the piping of the Recirculated Cooling Water System. The large pipe diameter and the requirement of maintaining the system in operation during the outage, imposed a special technology for fixing the leak (isolation of the line with ice plugs). The paper presents information about the performed repair work. After repair operations the failed duct was checked by non-destructive methods and the results were submitted and approved by regulation authorities. The repair was considered successfully completed and the Unit restarted on March 5, 2002 at 0.57 am when the electric generator was switched on in parallel to the national electric power system. (authors)

  3. Model case IRS-RWE for the determination of reliability data in practical operation

    Energy Technology Data Exchange (ETDEWEB)

    Hoemke, P; Krause, H

    1975-11-01

    Reliability und availability analyses are carried out to assess the safety of nuclear power plants. The paper deals in the first part with the requirement of accuracy for the input data of such analyses and in the second part with the prototype data collection of reliability data 'Model case IRS-RWE'. The objectives and the structure of the data collection are described. The present results show that the estimation of reliability data in power plants is possible and gives reasonable results.

  4. Evidence of Reliability and Validity for a Children’s Auditory Continuous Performance Test

    Directory of Open Access Journals (Sweden)

    Michael J. Lasee

    2013-11-01

    Full Text Available Continuous Performance Tests (CPTs are commonly utilized clinical measures of attention and response inhibition. While there have been many studies of CPTs that utilize a visual format, there is considerably less research employing auditory CPTs. The current study provides initial reliability and validity evidence for the Auditory Vigilance Screening Measure (AVSM, a newly developed CPT. Participants included 105 five- to nine-year-old children selected from two rural Midwestern school districts. Reliability data for the AVSM was collected through retesting of 42 participants. Validity was evaluated through correlation of AVSM scales with subscales from the ADHD Rating Scale–IV. Test–retest reliability coefficients ranged from .62 to .74 for AVSM subscales. A significant (r = .31 correlation was obtained between the AVSM Impulsivity Scale and teacher ratings of inattention. Limitations and implications for future study are discussed.

  5. Detection of Operator Performance Breakdown as an Automation Triggering Mechanism

    Science.gov (United States)

    Yoo, Hyo-Sang; Lee, Paul U.; Landry, Steven J.

    2015-01-01

    Performance breakdown (PB) has been anecdotally described as a state where the human operator "loses control of context" and "cannot maintain required task performance." Preventing such a decline in performance is critical to assure the safety and reliability of human-integrated systems, and therefore PB could be useful as a point at which automation can be applied to support human performance. However, PB has never been scientifically defined or empirically demonstrated. Moreover, there is no validated objective way of detecting such a state or the transition to that state. The purpose of this work is: 1) to empirically demonstrate a PB state, and 2) to develop an objective way of detecting such a state. This paper defines PB and proposes an objective method for its detection. A human-in-the-loop study was conducted: 1) to demonstrate PB by increasing workload until the subject reported being in a state of PB, and 2) to identify possible parameters of a detection method for objectively identifying the subjectively-reported PB point, and 3) to determine if the parameters are idiosyncratic to an individual/context or are more generally applicable. In the experiment, fifteen participants were asked to manage three concurrent tasks (one primary and two secondary) for 18 minutes. The difficulty of the primary task was manipulated over time to induce PB while the difficulty of the secondary tasks remained static. The participants' task performance data was collected. Three hypotheses were constructed: 1) increasing workload will induce subjectively-identified PB, 2) there exists criteria that identifies the threshold parameters that best matches the subjectively-identified PB point, and 3) the criteria for choosing the threshold parameters is consistent across individuals. The results show that increasing workload can induce subjectively-identified PB, although it might not be generalizable-only 12 out of 15 participants declared PB. The PB detection method based on

  6. A 2015 comparison of operational performance : Washington state ferries to ferry operators worldwide.

    Science.gov (United States)

    2015-03-01

    This report provides an update to the 2010 report A Comparison of Operational Performance: : Washington State Ferries to Ferry Operators Worldwide, observing changes in Washington State : Ferries, 23 other ferry systems, and the ferry industry ...

  7. Evaluation of new control rooms by operator performance analysis

    International Nuclear Information System (INIS)

    Mori, M; Tomizawa, T.; Tai, I.; Monta, K.; Yoshimura, S.; Hattori, Y.

    1987-01-01

    An advanced supervisory and control system called PODIA TM (Plant Operation by Displayed Information and Automation) was developed by Toshiba. Since this system utilizes computer driven CRTs as a main device for information transfer to operators, thorough system integration tests were performed at the factory and evaluations were made of operators' assessment from the initial experience of the system. The PODIA system is currently installed at two BWR power plants. Based on the experiences from the development of PODIA, a more advanced man-machine interface, Advanced-PODIA (A-PODIA), is developed. A-PODIA enhances the capabilities of PODIA in automation, diagnosis, operational guidance and information display. A-PODIA has been validated by carrying out systematic experiments with a full-scope simulator developed for the validation. The results of the experiments have been analyzed by the method of operator performance analysis and applied to further improvement of the A-PODIA system. As a feedback from actual operational experience, operator performance data in simulator training is an important source of information to evaluate human factors of a control room. To facilitate analysis of operator performance, a performance evaluation system has been developed by applying AI techniques. The knowledge contained in the performance evaluation system was elicited from operator training experts and represented as rules. The rules were implemented by employing an object-oriented paradigm to facilitate knowledge management. In conclusion, it is stated that the feedback from new control room operation can be obtained at an early stage by validation tests and also continuously by comprehensive evaluation (with the help of automated tools) of operator performance in simulator training. The results of operator performance analysis can be utilized for improvement of system design as well as operator training. (author)

  8. “Weather” transit is reliable? Using AVL data to explore tram performance in Melbourne, Australia

    Directory of Open Access Journals (Sweden)

    Mahmoud Mesbah

    2015-06-01

    Full Text Available This paper uses automatic vehicle location (AVL records to investigate the effect of weather conditions on the travel time reliability of on-road rail transit, through a case study of the Melbourne streetcar (tram network. The datasets available were an extensive historical AVL dataset as well as weather observations. The sample size used in the analysis included all trips made over a period of five years (2006–2010 inclusive, during the morning peak (7 am–9 am for fifteen randomly selected radial tram routes, all traveling to the Melbourne CBD. Ordinary least square (OLS regression analysis was conducted to create a linear model, with tram travel time being the dependent variable. An alternative formulation of the model is also compared. Travel time was regressed on various weather effects including precipitation, air temperature, sea level pressure and wind speed; as well as indicator variables for weekends, public holidays and route numbers to investigate a correlation between weather condition and the on-time performance of the trams. The results indicate that only precipitation and air temperature are significant in their effect on tram travel time. The model demonstrates that on average, an additional millimeter of precipitation during the peak period adversely affects the average travel time during that period by approximately 8 s, that is, rainfall tends to increase the travel time. The effect of air temperature is less intuitive, with the model indicating that trams adhere more closely to schedule when the temperature is different in absolute terms to the mean operating conditions (taken as 15 °C.

  9. Reliability calculations

    International Nuclear Information System (INIS)

    Petersen, K.E.

    1986-03-01

    Risk and reliability analysis is increasingly being used in evaluations of plant safety and plant reliability. The analysis can be performed either during the design process or during the operation time, with the purpose to improve the safety or the reliability. Due to plant complexity and safety and availability requirements, sophisticated tools, which are flexible and efficient, are needed. Such tools have been developed in the last 20 years and they have to be continuously refined to meet the growing requirements. Two different areas of application were analysed. In structural reliability probabilistic approaches have been introduced in some cases for the calculation of the reliability of structures or components. A new computer program has been developed based upon numerical integration in several variables. In systems reliability Monte Carlo simulation programs are used especially in analysis of very complex systems. In order to increase the applicability of the programs variance reduction techniques can be applied to speed up the calculation process. Variance reduction techniques have been studied and procedures for implementation of importance sampling are suggested. (author)

  10. Research of psychological characteristics and performance relativity of operators

    International Nuclear Information System (INIS)

    Fang Xiang; He Xuhong; Zhao Bingquan

    2008-01-01

    Based on the working tasks of an operator being taken into full consideration in this paper, on the one hand the table of measuring psychological characteristics is designed through the selection of special dimensions; on the other hand the table of performance appraisal is drafted through the choice of suitable standards of an operator. The paper analyzes the results of two aspects, sets relevant nuclear power plant operators as the research objective, and obtains the psychological characteristics and performance relativity of operators. The research can be as important and applied reference for the selection, evaluation and use of operators

  11. Nuclear power generating station operability assurance reliability, availability, and maintainability application for maintenance management

    International Nuclear Information System (INIS)

    Cleveland, J.W.; Regenie, T.R.; Wilson, R.J.

    1985-01-01

    Environmental qualification and equipment warrantee insurance stipulations should be supplemented with a reliable maintainability program structured to identify and control fast failing subcomponents within critical equipment. Anticipation of equipment subcomponent failures can control unnecessary plant off-line occurrences. Incorporation of reliability, availability, and maintainability considerations into plant maintenance policies on power generation and safety related items have positive cost benefit advantages

  12. Different Approaches for Ensuring Performance/Reliability of Plastic Encapsulated Microcircuits (PEMs) in Space Applications

    Science.gov (United States)

    Gerke, R. David; Sandor, Mike; Agarwal, Shri; Moor, Andrew F.; Cooper, Kim A.

    2000-01-01

    Engineers within the commercial and aerospace industries are using trade-off and risk analysis to aid in reducing spacecraft system cost while increasing performance and maintaining high reliability. In many cases, Commercial Off-The-Shelf (COTS) components, which include Plastic Encapsulated Microcircuits (PEMs), are candidate packaging technologies for spacecrafts due to their lower cost, lower weight and enhanced functionality. Establishing and implementing a parts program that effectively and reliably makes use of these potentially less reliable, but state-of-the-art devices, has become a significant portion of the job for the parts engineer. Assembling a reliable high performance electronic system, which includes COTS components, requires that the end user assume a risk. To minimize the risk involved, companies have developed methodologies by which they use accelerated stress testing to assess the product and reduce the risk involved to the total system. Currently, there are no industry standard procedures for accomplishing this risk mitigation. This paper will present the approaches for reducing the risk of using PEMs devices in space flight systems as developed by two independent Laboratories. The JPL procedure involves primarily a tailored screening with accelerated stress philosophy while the APL procedure is primarily, a lot qualification procedure. Both Laboratories successfully have reduced the risk of using the particular devices for their respective systems and mission requirements.

  13. The prone bridge test: Performance, validity, and reliability among older and younger adults.

    Science.gov (United States)

    Bohannon, Richard W; Steffl, Michal; Glenney, Susan S; Green, Michelle; Cashwell, Leah; Prajerova, Kveta; Bunn, Jennifer

    2018-04-01

    The prone bridge maneuver, or plank, has been viewed as a potential alternative to curl-ups for assessing trunk muscle performance. The purpose of this study was to assess prone bridge test performance, validity, and reliability among younger and older adults. Sixty younger (20-35 years old) and 60 older (60-79 years old) participants completed this study. Groups were evenly divided by sex. Participants completed surveys regarding physical activity and abdominal exercise participation. Height, weight, body mass index (BMI), and waist circumference were measured. On two occasions, 5-9 days apart, participants held a prone bridge until volitional exhaustion or until repeated technique failure. Validity was examined using data from the first session: convergent validity by calculating correlations between survey responses, anthropometrics, and prone bridge time, known groups validity by using an ANOVA comparing bridge times of younger and older adults and of men and women. Test-retest reliability was examined by using a paired t-test to compare prone bridge times for Session1 and Session 2. Furthermore, an intraclass correlation coefficient (ICC) was used to characterize relative reliability and minimal detectable change (MDC 95% ) was used to describe absolute reliability. The mean prone bridge time was 145.3 ± 71.5 s, and was positively correlated with physical activity participation (p ≤ 0.001) and negatively correlated with BMI and waist circumference (p ≤ 0.003). Younger participants had significantly longer plank times than older participants (p = 0.003). The ICC between testing sessions was 0.915. The prone bridge test is a valid and reliable measure for evaluating abdominal performance in both younger and older adults. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Improving Operational Risk Management Using Business Performance Management Technologies

    OpenAIRE

    Bram Pieket Weeserik; Marco Spruit

    2018-01-01

    Operational Risk Management (ORM) comprises the continuous management of risks resulting from: human actions, internal processes, systems, and external events. With increasing requirements, complexity and a growing volume of risks, information systems provide benefits for integrating risk management activities and optimizing performance. Business Performance Management (BPM) technologies are believed to provide a solution for effective Operational Risk Management by offering several combined ...

  15. Method of performing a layer operation in a communications network

    NARCIS (Netherlands)

    Bosch, H.G.P.; Mullender, Sape J.; Narlikar, G.J.

    2006-01-01

    In an embodiment of the present invention, a scheduling operation is performed at a lower layer based on upper layer information. In another embodiment of the present invention, an action is performed at an upper layer based on received lower layer information. Also, a scheduling operation may be

  16. RELIABILITY OF ANKLE-FOOT MORPHOLOGY, MOBILITY, STRENGTH, AND MOTOR PERFORMANCE MEASURES.

    Science.gov (United States)

    Fraser, John J; Koldenhoven, Rachel M; Saliba, Susan A; Hertel, Jay

    2017-12-01

    Assessment of foot posture, morphology, intersegmental mobility, strength and motor control of the ankle-foot complex are commonly used clinically, but measurement properties of many assessments are unclear. To determine test-retest and inter-rater reliability, standard error of measurement, and minimal detectable change of morphology, joint excursion and play, strength, and motor control of the ankle-foot complex. Reliability study. 24 healthy, recreationally-active young adults without history of ankle-foot injury were assessed by two clinicians on two occasions, three to ten days apart. Measurement properties were assessed for foot morphology (foot posture index, total and truncated length, width, arch height), joint excursion (weight-bearing dorsiflexion, rearfoot and hallux goniometry, forefoot inclinometry, 1 st metatarsal displacement) and joint play, strength (handheld dynamometry), and motor control rating during intrinsic foot muscle (IFM) exercises. Clinician order was randomized using a Latin Square. The clinicians performed independent examinations and did not confer on the findings for the duration of the study. Test-retest and inter-tester reliability and agreement was assessed using intraclass correlation coefficients (ICC 2,k ) and weighted kappa ( K w ). Test-retest reliability ICC were as follows: morphology: .80-1.00, joint excursion: .58-.97, joint play: -.67-.84, strength: .67-.92, IFM motor rating: K W -.01-.71. Inter-rater reliability ICC were as follows: morphology: .81-1.00, joint excursion: .32-.97, joint play: -1.06-1.00, strength: .53-.90, and IFM motor rating: K w .02-.56. Measures of ankle-foot posture, morphology, joint excursion, and strength demonstrated fair to excellent test-retest and inter-rater reliability. Test-retest reliability for rating of perceived difficulty and motor performance was good to excellent for short-foot, toe-spread-out, and hallux exercises and poor to fair for lesser toe extension. Joint play measures had

  17. Reliability of Modern Scores to Predict Long-Term Mortality After Isolated Aortic Valve Operations.

    Science.gov (United States)

    Barili, Fabio; Pacini, Davide; D'Ovidio, Mariangela; Ventura, Martina; Alamanni, Francesco; Di Bartolomeo, Roberto; Grossi, Claudio; Davoli, Marina; Fusco, Danilo; Perucci, Carlo; Parolari, Alessandro

    2016-02-01

    Contemporary scores for estimating perioperative death have been proposed to also predict also long-term death. The aim of the study was to evaluate the performance of the updated European System for Cardiac Operative Risk Evaluation II, The Society of Thoracic Surgeons Predicted Risk of Mortality score, and the Age, Creatinine, Left Ventricular Ejection Fraction score for predicting long-term mortality in a contemporary cohort of isolated aortic valve replacement (AVR). We also sought to develop for each score a simple algorithm based on predicted perioperative risk to predict long-term survival. Complete data on 1,444 patients who underwent isolated AVR in a 7-year period were retrieved from three prospective institutional databases and linked with the Italian Tax Register Information System. Data were evaluated with performance analyses and time-to-event semiparametric regression. Survival was 83.0% ± 1.1% at 5 years and 67.8 ± 1.9% at 8 years. Discrimination and calibration of all three scores both worsened for prediction of death at 1 year and 5 years. Nonetheless, a significant relationship was found between long-term survival and quartiles of scores (p System for Cardiac Operative Risk Evaluation II, 1.34 (95% CI, 1.28 to 1.40) for the Society of Thoracic Surgeons score, and 1.08 (95% CI, 1.06 to 1.10) for the Age, Creatinine, Left Ventricular Ejection Fraction score. The predicted risk generated by European System for Cardiac Operative Risk Evaluation II, The Society of Thoracic Surgeons score, and Age, Creatinine, Left Ventricular Ejection Fraction scores cannot also be considered a direct estimate of the long-term risk for death. Nonetheless, the three scores can be used to derive an estimate of long-term risk of death in patients who undergo isolated AVR with the use of a simple algorithm. Copyright © 2016 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  18. Coal quality influence on availability and reliability of two 620 MW lignite fired units after 100 000 operating hours

    International Nuclear Information System (INIS)

    Markovic, Dragomir

    1997-01-01

    General statistics data on operation of two 620 MW low calorific value coal fired units are foundation for analysis of influence of variable coal characteristics on availability and reliability. Changeable mineralogical structure, ash contents and heating value cause the following problems: increased abrasive wear and unstable firing. Almost 23 % of plant shutting down are caused by the mentioned reasons, which have multiplied in the last years. Analysis will show how it is possible to plan terms of overhaul of boilers with respect to quality of used coal and reliability of pipe system and maintenance of high level of availability and reliability in spite of periodical low heating value of coal. Described experiences are also important for planning, design, construction and operation of new power plants firing with same coal. (Author)

  19. Evaluation of the Influence of the Logistic Operations Reliability on the Total Costs of a Supply Chain

    Directory of Open Access Journals (Sweden)

    Lukinskiy Valery

    2016-12-01

    Full Text Available Nowadays in logistics integral processes between the material and related flows in supply chains are getting developed more and more. However, in spite of increasing volume of statistical data which reflect the integral processes, the influence evaluation issues of the logistic operations reliability indexes on the total logistics costs remain open and require the corresponding researches implementation.

  20. THE SIMULATION DIAGNOSTIC METHODS AND REGENERATION WAYS OF REINFORCED - CONCRETE CONSTRUCTIONS OF BRIDGES IN PROVIDING THEIR OPERATING RELIABILITY AND LONGEVITY

    Directory of Open Access Journals (Sweden)

    B. V. Savchinskiy

    2010-03-01

    Full Text Available On the basis of analysis of existing diagnostic methods and regeneration ways of reinforced-concrete constructions of bridges the recommendations on introduction of new modern technologies of renewal of reinforced-concrete constructions of bridges in providing their operating reliability and longevity are offered.

  1. THE SIMULATION DIAGNOSTIC METHODS AND REGENERATION WAYS OF REINFORCED - CONCRETE CONSTRUCTIONS OF BRIDGES IN PROVIDING THEIR OPERATING RELIABILITY AND LONGEVITY

    OpenAIRE

    B. V. Savchinskiy

    2010-01-01

    On the basis of analysis of existing diagnostic methods and regeneration ways of reinforced-concrete constructions of bridges the recommendations on introduction of new modern technologies of renewal of reinforced-concrete constructions of bridges in providing their operating reliability and longevity are offered.

  2. 76 FR 66328 - Callaway Golf Ball Operations, Inc., Including On-Site Leased Workers From Reliable Temp Services...

    Science.gov (United States)

    2011-10-26

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-80,110] Callaway Golf Ball... Golf Ball Operations, Inc., including on-site leased workers from Reliable Temp Services, Inc., and... production of golf balls. The notice was published in the Federal Register on July 8, 2011 (76 FR 40401). At...

  3. Introduction of composite reliability evaluation in power system operation planning; Introducao da confiabilidade composta no planejamento da operacao eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Schilling, M T; Gomes, P [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper gives an overview of an ongoing, detailed and first-hand investigation about the current reliability levels of the Brazilian power system, as seen from the electrical operation planning point-of-view. A set of practical results are presented and commented. (author) 41 refs., 4 figs., 4 tabs.

  4. The model case IRS-RWE for the determination of reliability data in practical operation

    International Nuclear Information System (INIS)

    Hoemke, P.; Krause, H.

    1975-11-01

    Reliability und availability analyses are carried out to assess the safety of nuclear power plants. This paper deals in the first part with the requirement of accuracy for the input data of such analyses and in the second part with the prototype data collection of reliability data 'Model case IRS-RWE'. The objectives and the structure of the data collection will be described. The present results show that the estimation of reliability data in power plants is possible and gives reasonable results. (orig.) [de

  5. The Performance of an Object-Oriented, Parallel Operating System

    Directory of Open Access Journals (Sweden)

    David R. Kohr, Jr.

    1994-01-01

    Full Text Available The nascent and rapidly evolving state of parallel systems often leaves parallel application developers at the mercy of inefficient, inflexible operating system software. Given the relatively primitive state of parallel systems software, maximizing the performance of parallel applications not only requires judicious tuning of the application software, but occasionally, the replacement of specific system software modules with others that can more readily respond to the imposed pattern of resource demands. To assess the feasibility of application and performance tuning via malleable system software and to understand the performance penalties for detailed operating system performance data capture, we describe a set of performance instrumentation techniques for parallel, object-oriented operating systems and a set of performance experiments with Choices, an experimental, object-oriented operating system designed for use with parallel sys- tems. These performance experiments show that (a the performance overhead for operating system data capture is modest, (b the penalty for malleable, object-oriented operating systems is negligible, but (c techniques are needed to strictly enforce adherence of implementation to design if operating system modules are to be replaced.

  6. Performance and reliability of the Y-Balance TestTM in high school athletes.

    Science.gov (United States)

    Smith, Laura J; Creps, James R; Bean, Ryan; Rodda, Becky; Alsalaheen, Bara

    2017-11-07

    Lower extremity injuries account for 32.9% of the overall injuries in high school athletes. Previous research has suggested that asymmetry greater than 4cm using the Y-Balance TestTM Lower Quarter (YBT-LQ) in the anterior direction is predictive of non- contact injuries in adults and collegiate athletes. The prevalence of asymmetries or abnormal YBT-LQ performance is not well documented for adolescents. The primary purposes of this study are: 1) to characterize the prevalence of YBT-LQ asymmetries and performance in a cross-sectional sample of adolescents, 2) to examine possible differences in performance on the YBT-LQ between male and female adolescents, and 3) to describe the test-retest reliability of the YBT-LQ in a subsample of adolescents. Observational cross-sectional study. High-school athletes completed the YBT-LQ as main outcome measure. 51 male, 59 female high-school athletes participated in this study. Asymmetries greater than 4cm in the posteromedial (PM) reach direction were most prevalent for male (54.9%) and female (50.8%) participants. Females presented with slightly higher composite scores. Good reliability (ICC = 0.89) was found for the anterior (ANT) direction, and moderate reliability with 0.76 for posterolateral (PL) and 0.63 for PM directions. The MDC95 for the ANT direction was 6% and 12% for both the PL and PM directions. The YBT-LQ performance can be beneficial in assessing recovery in an injured extremity compared to the other limb. However, due to the large MDC95, noted in the PM and PL directions, the differences between sequential testing cannot be attributed to true change in balance unless they exceed the MDC95. In this study, 79% of the athletes presented with at least one asymmetry in YBT-LQ reach distances. Moderate reliability in the PL and PM directions warrants reexamination of the definition of asymmetry in these directions.

  7. Reliability of performance velocity for jump squats under feedback and nonfeedback conditions.

    Science.gov (United States)

    Randell, Aaron D; Cronin, John B; Keogh, Justin Wl; Gill, Nicholas D; Pedersen, Murray C

    2011-12-01

    Randell, AD, Cronin, JB, Keogh, JWL, Gill, ND, and Pedersen, MC. Reliability of performance velocity for jump squats under feedback and nonfeedback conditions. J Strength Cond Res 25(12): 3514-3518, 2011-Advancements in the monitoring of kinematic and kinetic variables during resistance training have resulted in the ability to continuously monitor performance and provide feedback during training. If equipment and software can provide reliable instantaneous feedback related to the variable of interest during training, it is thought that this may result in goal-oriented movement tasks that increase the likelihood of transference to on-field performance or at the very least improve the mechanical variable of interest. The purpose of this study was to determine the reliability of performance velocity for jump squats under feedback and nonfeedback conditions over 3 consecutive training sessions. Twenty subjects were randomly allocated to a feedback or nonfeedback group, and each group performed a total of 3 "jump squat" training sessions with the velocity of each repetition measured using a linear position transducer. There was less change in mean velocities between sessions 1-2 and sessions 2-3 (0.07 and 0.02 vs. 0.13 and -0.04 m·s), less random variation (TE = 0.06 and 0.06 vs. 0.10 and 0.07 m·s) and greater consistency (intraclass correlation coefficient = 0.83 and 0.87 vs. 0.53 and 0.74) between sessions for the feedback condition as compared to the nonfeedback condition. It was concluded that there is approximately a 50-50 probability that the provision of feedback was beneficial to the performance in the squat jump over multiple sessions. It is suggested that this has the potential for increasing transference to on-field performance or at the very least improving the mechanical variable of interest.

  8. Reliability assessment of stress concentration performance state for a perforated composite plate under traction

    Directory of Open Access Journals (Sweden)

    Jabbouri A.

    2012-07-01

    Full Text Available Considering a perforated sandwich plate made from two elastic homogenous and isotropic layers, and having a square hole, reliability assessment of stress concentration limit state for which the stress should not exceed a given threshold is performed in this work. Assuming that the plate dimensions and the applied loading are deterministic, focus is done on the square hole centre position and edge length considered to be random variables. The means and the standard deviations of these variables are assumed to be known, but no information is so far available about their densities of probabilities. To assess reliability of the performance state, reliability analysis known methods are applied to a response surface representation of the stress concentration factor of the perforated plate which is obtained through quadratic polynomial regression of finite element results. A parametric study is performed regarding the influence of the distributions of probabilities chosen to model the hole dimensions uncertainties. It is shown that the probability of failure depends largely on the selected densities of probabilities.

  9. Some Aspects of Psychophysiological Support of Crew Member's Performance Reliability in Space Flight

    Science.gov (United States)

    Nechaev, A. P.; Myasnikov, V. I.; Stepanova, S. I.; Isaev, G. F.; Bronnikov, S. V.

    The history of cosmonautics demonstrates many instances in which only crewmembers' intervention allowed critical situations to be resolved, or catastrophes to be prevented. However, during "crew-spacecraft" system operation human is exposed by influence of numerous flight factors, and beforehand it is very difficult to predict their effects on his functional state and work capacity. So, the incidents are known when unfavorable alterations of crewmember's psychophysiological state (PPS) provoked errors in task performance. The objective of the present investigation was to substantiate the methodological approach directed to increase reliability of a crewmember performance (human error prevention) by means of management of his/her PPS. The specific aims of the investigation were: 1) to evaluate the statistical significance of the interrelation between crew errors (CE) and crewmember's PPS, and 2) to develop the way of PPS management. At present, there is no conventional method to assess combined effect of flight conditions (microgravity, confinement, psychosocial factors, etc.) on crewmembers' PPS. For this purpose experts of the Medical Support Group (psychoneurologists and psychologists) at the Moscow Mission Control Center analyze information received during radio and TV contacts with crew. Peculiarities of behavior, motor activity, sleep, speech, mood, emotional reactions, well-being and sensory sphere, trend of dominant interests and volitional acts, signs of deprivation phenomena are considered as separate indicators of crewmember's PPS. The set of qualitative symptoms reflecting PPS alterations and corresponding to them ratings (in arbitrary units) was empirically stated for each indicator. It is important to emphasize that symptoms characterizing more powerful PPS alterations have higher ratings. Quantitative value of PPS integral parameter is calculating by adding up the ratings of all separate indicators over a day, a week, or other temporal interval (in

  10. Evolution of Machine Reliability and Life and Economics of Operational Use

    Directory of Open Access Journals (Sweden)

    Młynarski Stanisław

    2016-12-01

    Full Text Available The article presents new assumptions for reliability and life of machines, resulting from the development of technology. The innovative approach to reliability and life design as well as warranty duration planning is presented on an example of vehicle reliability characteristics. A new algorithm is proposed for the replacement of repairable objects costs by the price of life and reliability of new unrepairable ones. For the planning of the life of innovative machines, an effective method of technical progress rate determination is proposed. In conclusion, necessary modifications of machine and vehicle use systems, resulting from technology evolution and technical progress, are indicated. Finally, recommendations and directions of indispensable research in engineering and management of technical means of production are formulated.

  11. Improvements in operational safety performance of the Magnox power stations

    Energy Technology Data Exchange (ETDEWEB)

    Marchese, C.J. [BNFL Magnox Generation, Berkeley (United Kingdom)

    2000-10-01

    In the 43 years since commencement of operation of Calder Hall, the first Magnox power station, there remain eight Magnox stations and 20 reactors still in operation, owned by BNFL Magnox Generation. This paper describes how the operational safety performance of these stations has significantly improved over the last ten years. This has been achieved against a background of commercial competition introduced by privatization and despite the fact that the Magnox base design belongs to the past. Finally, the company's future plans for continued improvements in operational safety performance are discussed. (author)

  12. Silicon Carbide (SiC) Device and Module Reliability, Performance of a Loop Heat Pipe Subjected to a Phase-Coupled Heat Input to an Acceleration Field

    Science.gov (United States)

    2016-05-01

    AFRL-RQ-WP-TR-2016-0108 SILICON CARBIDE (SiC) DEVICE AND MODULE RELIABILITY Performance of a Loop Heat Pipe Subjected to a Phase-Coupled...CARBIDE (SiC) DEVICE AND MODULE RELIABILITY Performance of a Loop Heat Pipe Subjected to a Phase-Coupled Heat Input to an Acceleration Field 5a...Shukla, K., “Thermo-fluid dynamics of Loop Heat Pipe Operation,” International Communications in Heat and Mass Transfer , Vol. 35, No. 8, 2008, pp

  13. Performance of intraclass correlation coefficient (ICC) as a reliability index under various distributions in scale reliability studies.

    Science.gov (United States)

    Mehta, Shraddha; Bastero-Caballero, Rowena F; Sun, Yijun; Zhu, Ray; Murphy, Diane K; Hardas, Bhushan; Koch, Gary

    2018-04-29

    Many published scale validation studies determine inter-rater reliability using the intra-class correlation coefficient (ICC). However, the use of this statistic must consider its advantages, limitations, and applicability. This paper evaluates how interaction of subject distribution, sample size, and levels of rater disagreement affects ICC and provides an approach for obtaining relevant ICC estimates under suboptimal conditions. Simulation results suggest that for a fixed number of subjects, ICC from the convex distribution is smaller than ICC for the uniform distribution, which in turn is smaller than ICC for the concave distribution. The variance component estimates also show that the dissimilarity of ICC among distributions is attributed to the study design (ie, distribution of subjects) component of subject variability and not the scale quality component of rater error variability. The dependency of ICC on the distribution of subjects makes it difficult to compare results across reliability studies. Hence, it is proposed that reliability studies should be designed using a uniform distribution of subjects because of the standardization it provides for representing objective disagreement. In the absence of uniform distribution, a sampling method is proposed to reduce the non-uniformity. In addition, as expected, high levels of disagreement result in low ICC, and when the type of distribution is fixed, any increase in the number of subjects beyond a moderately large specification such as n = 80 does not have a major impact on ICC. Copyright © 2018 John Wiley & Sons, Ltd.

  14. Highly-reliable operation of 638-nm broad stripe laser diode with high wall-plug efficiency for display applications

    Science.gov (United States)

    Yagi, Tetsuya; Shimada, Naoyuki; Nishida, Takehiro; Mitsuyama, Hiroshi; Miyashita, Motoharu

    2013-03-01

    Laser based displays, as pico to cinema laser projectors have gathered much attention because of wide gamut, low power consumption, and so on. Laser light sources for the displays are operated mainly in CW, and heat management is one of the big issues. Therefore, highly efficient operation is necessitated. Also the light sources for the displays are requested to be highly reliable. 638 nm broad stripe laser diode (LD) was newly developed for high efficiency and highly reliable operation. An AlGaInP/GaAs red LD suffers from low wall plug efficiency (WPE) due to electron overflow from an active layer to a p-cladding layer. Large optical confinement factor (Γ) design with AlInP cladding layers is adopted to improve the WPE. The design has a disadvantage for reliable operation because the large Γ causes high optical density and brings a catastrophic optical degradation (COD) at a front facet. To overcome the disadvantage, a window-mirror structure is also adopted in the LD. The LD shows WPE of 35% at 25°C, highest record in the world, and highly stable operation at 35°C, 550 mW up to 8,000 hours without any catastrophic optical degradation.

  15. The Effects of International Operations on the Relationship Between Manufacturing Improvement Programs and Operational Performance

    DEFF Research Database (Denmark)

    Matyusz, Zsolt; Demeter, Krisztina; Boer, Harry

    The link between manufacturing programs and operational performance, and the effects of company internal and external factors on that relationship, are well studied in the literature, both theoretically and empirically. However, previous studies rarely took into account how the scope of operations...... of the business unit affects the relationship between manufacturing programs and performances. We investigate the scope of operations from the manufacturing perspective (i.e. companies that manufacture in only one country have narrow scope of operations, while companies that manufacture in more than one country...... have broad scope of operations). We apply structural equation modelling (SEM) using PLS path modelling to investigate the effect of scope of operations on the relationship between manufacturing improvement programs and operational performance. Manufacturing improvement programs are programs like...

  16. Development of a valid and reliable test to assess trauma radiograph interpretation performance

    International Nuclear Information System (INIS)

    Neep, M.J.; Steffens, T.; Riley, V.; Eastgate, P.; McPhail, S.M.

    2017-01-01

    Objectives: The purpose of this investigation was to develop and examine the preliminary validity and reliability among radiographers of a test to assess trauma radiograph interpretation performance suitable for use among health professionals. Methods: Stage 1 examined 14,159 consecutive appendicular and axial examinations from a hospital emergency department over a 12 month period to quantify a typical anatomical region case-mix of trauma radiographs. A sample of radiographic cases representative of affected anatomical regions was then developed into the Image Interpretation Test (IIT). Stage 2 involved prospective investigations of the IIT's reliability (inter-rater, intra-rater, internal consistency) and validity (concurrent) among 41 radiographers. Results: The IIT included 60 cases. The median (interquartile range) clinical experience of participants was 5 (2–10) years. Case scores were internally consistent (Cronbach's alpha = 0.90). Favourable inter-rater reliability (kappa > 0.70 for 58/60 cases, Intra-class correlation coefficient (ICC) > 0.99 for total score) and intra-rater reliability (kappa > 0.90 for 60/60 cases, ICC > 0.99 for total score) was observed. There was a positive association between radiographers' confidence in image interpretation and IIT score (coefficient = 1.52, r-squared = 0.60, p < 0.001). Conclusions: The IIT developed during this investigation included a selection of radiographic cases consistent with anatomical regions represented in an adult trauma case-mix. This study has also provided foundational preliminary evidence to support the reliability and validity of the IIT among radiographers. The findings suggest that it is possible to assess image interpretation performance of adult trauma radiographs with this test. - Highlights: • Development of an Image Interpretation Test (IIT). • Cases consistent with anatomical regions represented in a typical adult trauma case-mix. • Development of a

  17. Reliability- and performance-based robust design optimization of MEMS structures considering technological uncertainties

    Science.gov (United States)

    Martowicz, Adam; Uhl, Tadeusz

    2012-10-01

    The paper discusses the applicability of a reliability- and performance-based multi-criteria robust design optimization technique for micro-electromechanical systems, considering their technological uncertainties. Nowadays, micro-devices are commonly applied systems, especially in the automotive industry, taking advantage of utilizing both the mechanical structure and electronic control circuit on one board. Their frequent use motivates the elaboration of virtual prototyping tools that can be applied in design optimization with the introduction of technological uncertainties and reliability. The authors present a procedure for the optimization of micro-devices, which is based on the theory of reliability-based robust design optimization. This takes into consideration the performance of a micro-device and its reliability assessed by means of uncertainty analysis. The procedure assumes that, for each checked design configuration, the assessment of uncertainty propagation is performed with the meta-modeling technique. The described procedure is illustrated with an example of the optimization carried out for a finite element model of a micro-mirror. The multi-physics approach allowed the introduction of several physical phenomena to correctly model the electrostatic actuation and the squeezing effect present between electrodes. The optimization was preceded by sensitivity analysis to establish the design and uncertain domains. The genetic algorithms fulfilled the defined optimization task effectively. The best discovered individuals are characterized by a minimized value of the multi-criteria objective function, simultaneously satisfying the constraint on material strength. The restriction of the maximum equivalent stresses was introduced with the conditionally formulated objective function with a penalty component. The yielded results were successfully verified with a global uniform search through the input design domain.

  18. What Drive the Damage to Post-Merger Operating Performance?

    Directory of Open Access Journals (Sweden)

    Soegiharto Soegiharto

    2010-05-01

    Full Text Available This study examines whether bidders’ post-merger operat-ing performance are affected by their CEO behavior, premiumspaid to the target firms, the period of mergers, the method ofpayment, the industry of merged firms, capital liquidity, andtheir pre-merger operating performance. Testing the U.S. suc-cessful merger and acquisition data for the period of 1990s, thisstudy finds that in-wave mergers, intra-industry mergers, thepayment of lower premiums, and better pre-merger operatingperformance drive the bidders to produce better post-mergeroperating performance. Three measures of CEO behavior—themain predictor scrutinezed in this study—are proposed andexamined, and the results demonstrate that the effects of thesemeasures on post-merger operating performance are mixed,suggesting that each of the behavioral measures designed in thisstudy may capture CEO behavior in different ways. Keywords: capital liquidity; CEO overconfidence; merger waves, method of pay-ment operating performance

  19. Correlation of cutting fluid performance in different machining operations

    DEFF Research Database (Denmark)

    De Chiffre, Leonardo; Belluco, Walter

    2001-01-01

    An analysis of cutting fluid performance in different metal cutting operations is presented, based on experimental investigations in which type of operation, performance criteria, work material, and fluid type are considered. Cutting fluid performance was evaluated in turning, drilling, reaming...... investigated. Results show that correlation of cutting fluid performance in different operations exists, within the same group of cutting fluids, in the case of stainless steel as workpiece material. Under the tested conditions, the average correlation coefficients between efficiency parameters with different...... operations on austenitic stainless steel lied in the range 0.87-0.97 for waterbased fluids and 0.79-0.89 for straight oils. A similar correlation could not be found for the other workpiece materials investigated in this work. A rationalisation of cutting fluid performance tests is suggested....

  20. A comparison of operational performance : Washington state ferries to ferry operators worldwide.

    Science.gov (United States)

    2010-06-01

    This project compares eight measures of performance related to transit service quality (e.g. trip reliability, on-time departures) and cost-efficiency (e.g. farebox recovery, subsidy per passenger) between Washington State Ferries (WSF) and 23 ferry ...

  1. Pursuit of excellence in F/H operator performance

    International Nuclear Information System (INIS)

    Keelan, B.; Curle, B.

    1996-01-01

    Performance of any fuel handling system is heavily dependent on the performance of the system operators. Sadly, this topic often receives little attention until incidents occur. Darlington has taken a proactive approach designed to reach and maintain excellent operator performance. Expectations and Standards are generated and published. A detailed, goal-oriented, auditable training program, which includes hands-on training modules, ensures operators reach the standards before qualifications are granted. Refresher courses maintain current skills. A depersonalized, computerized reporting system ensures training and standards are updated to match current situations. (author). 1 fig

  2. Pursuit of excellence in F/H operator performance

    Energy Technology Data Exchange (ETDEWEB)

    Keelan, B; Curle, B [Ontario Hydro, Bowmanville (Canada). Darlington Nuclear Generating Station

    1997-12-31

    Performance of any fuel handling system is heavily dependent on the performance of the system operators. Sadly, this topic often receives little attention until incidents occur. Darlington has taken a proactive approach designed to reach and maintain excellent operator performance. Expectations and Standards are generated and published. A detailed, goal-oriented, auditable training program, which includes hands-on training modules, ensures operators reach the standards before qualifications are granted. Refresher courses maintain current skills. A depersonalized, computerized reporting system ensures training and standards are updated to match current situations. (author). 1 fig.

  3. 75 FR 81157 - Version One Regional Reliability Standard for Transmission Operations

    Science.gov (United States)

    2010-12-27

    ... not exceed the path's system operating limits, when the transmission operator implements its real-time... return the actual power flow to within [system operating limits] such that at no time shall the power... return the transmission system to within [system operating limits] within a time certain, only a...

  4. Reliability and validity of the Performance Recorder 1 for measuring isometric knee flexor and extensor strength.

    Science.gov (United States)

    Neil, Sarah E; Myring, Alec; Peeters, Mon Jef; Pirie, Ian; Jacobs, Rachel; Hunt, Michael A; Garland, S Jayne; Campbell, Kristin L

    2013-11-01

    Muscular strength is a key parameter of rehabilitation programs and a strong predictor of functional capacity. Traditional methods to measure strength, such as manual muscle testing (MMT) and hand-held dynamometry (HHD), are limited by the strength and experience of the tester. The Performance Recorder 1 (PR1) is a strength assessment tool attached to resistance training equipment and may be a time- and cost-effective tool to measure strength in clinical practice that overcomes some limitations of MMT and HHD. However, reliability and validity of the PR1 have not been reported. Test-retest and inter-rater reliability was assessed using the PR1 in healthy adults (n  =  15) during isometric knee flexion and extension. Criterion-related validity was assessed through comparison of values obtained from the PR1 and Biodex® isokinetic dynamometer. Test-retest reliability was excellent for peak knee flexion (intra-class correlation coefficient [ICC] of 0.96, 95% CI: 0.85, 0.99) and knee extension (ICC  =  0.96, 95% CI: 0.87, 0.99). Inter-rater reliability was also excellent for peak knee flexion (ICC  =  0.95, 95% CI: 0.85, 0.99) and peak knee extension (ICC  =  0.97, 95% CI: 0.91, 0.99). Validity was moderate for peak knee flexion (ICC  =  0.75, 95% CI: 0.38, 0.92) but poor for peak knee extension (ICC  =  0.37, 95% CI: 0, 0.73). The PR1 provides a reliable measure of isometric knee flexor and extensor strength in healthy adults that could be used in the clinical setting, but absolute values may not be comparable to strength assessment by gold-standard measures.

  5. IEEE standard requirements for reliability analysis in the design and operation of safety systems for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The purpose of this standard is to provide uniform, minimum acceptable requirements for the performance of reliability analyses for safety-related systems found in nuclear-power generating stations, but not to define the need for an analysis. The need for reliability analysis has been identified in other standards which expand the requirements of regulations (e.g., IEEE Std 379-1972 (ANSI N41.2-1972), ''Guide for the Application of the Single-Failure Criterion to Nuclear Power Generating Station Protection System,'' which describes the application of the single-failure criterion). IEEE Std 352-1975, ''Guide for General Principles of Reliability Analysis of Nuclear Power Generating Station Protection Systems,'' provides guidance in the application and use of reliability techniques referred to in this standard

  6. Review of the human reliability analysis performed for Empire State Electric Energy Research Corporation

    International Nuclear Information System (INIS)

    Swart, D.; Banz, I.

    1985-01-01

    The Empire State Electric Energy Research Corporation (ESEERCO) commissioned Westinghouse to conduct a human reliability analysis to identify and quantify human error probabilities associated with operator actions for four specific events which may occur in light water reactors: loss of coolant accident, steam generator tube rupture, steam/feed line break, and stuck open pressurizer spray valve. Human Error Probabilities (HEPs) derived from Swain's Technique for Human Error Rate Prediction (THERP) were compared to data obtained from simulator exercises. A correlation was found between the HEPs derived from Swain and the results of the simulator data. The results of this study provide a unique insight into human factors analysis. The HEPs obtained from such probabilistic studies can be used to prioritize scenarios for operator training situations, and thus improve the correlation between simulator exercises and real control room experiences

  7. Supporting human performance in operations - principles for new nuclear build

    International Nuclear Information System (INIS)

    Lane, L.; Davey, E.

    2006-01-01

    Operational experience worldwide continues to demonstrate that human performance is a key factor in the ongoing safety, production, and protection of investment in operation of nuclear plants for electricity generation. Human performance in support of plant operational objectives can be influenced by a range of factors, for example: organizational culture and expectations; role assignments, training, and individual and team behaviours; and the support offered by the workplace environment, tools, and task design. This paper outlines a perspective on some of the principles that should be considered for application in the design of new nuclear build to facilitate support for human performance in plant operations. The principles identified focus on but are not limited to the tasks of shift staff, and are derived from the observations and experience of the authors who are experienced with control room operations in current plants. (author)

  8. Supporting human performance in operations - principles for new nuclear build

    Energy Technology Data Exchange (ETDEWEB)

    Lane, L. [Ontario Power Generation, Darlington Nuclear Div., Bowmanville, Ontario (Canada); Davey, E. [Crew Systems Solutions, Deep River, Ontario (Canada)

    2006-07-01

    Operational experience worldwide continues to demonstrate that human performance is a key factor in the ongoing safety, production, and protection of investment in operation of nuclear plants for electricity generation. Human performance in support of plant operational objectives can be influenced by a range of factors, for example: organizational culture and expectations; role assignments, training, and individual and team behaviours; and the support offered by the workplace environment, tools, and task design. This paper outlines a perspective on some of the principles that should be considered for application in the design of new nuclear build to facilitate support for human performance in plant operations. The principles identified focus on but are not limited to the tasks of shift staff, and are derived from the observations and experience of the authors who are experienced with control room operations in current plants. (author)

  9. Visual perspective in autobiographical memories: reliability, consistency, and relationship to objective memory performance.

    Science.gov (United States)

    Siedlecki, Karen L

    2015-01-01

    Visual perspective in autobiographical memories was examined in terms of reliability, consistency, and relationship to objective memory performance in a sample of 99 individuals. Autobiographical memories may be recalled from two visual perspectives--a field perspective in which individuals experience the memory through their own eyes, or an observer perspective in which individuals experience the memory from the viewpoint of an observer in which they can see themselves. Participants recalled nine word-cued memories that differed in emotional valence (positive, negative and neutral) and rated their memories on 18 scales. Results indicate that visual perspective was the most reliable memory characteristic overall and is consistently related to emotional intensity at the time of recall and amount of emotion experienced during the memory. Visual perspective is unrelated to memory for words, stories, abstract line drawings or faces.

  10. Thermal Performance and Reliability Characterization of Bonded Interface Materials (BIMs): Preprint

    Energy Technology Data Exchange (ETDEWEB)

    DeVoto, D.; Paret, P.; Mihalic, M.; Narumanchi, S.; Bar-Cohen, A.; Matin, K.

    2014-08-01

    Thermal interface materials are an important enabler for low thermal resistance and reliable electronics packaging for a wide array of applications. There is a trend towards bonded interface materials (BIMs) because of their potential for low thermal resistivity (< 1 mm2K/W). However, BIMs induce thermomechanical stresses in the package and can be prone to failures and integrity risks. Deteriorated interfaces can result in high thermal resistance in the package and degradation and/or failure of the electronics. DARPA's Thermal Management Technologies program has addressed this challenge, supporting the development of mechanically-compliant, low resistivity nano-thermal interface (NTI) materials. In this work, we describe the testing procedure and report the results of NREL's thermal performance and reliability characterization of an initial sample of four different NTI-BIMs.

  11. A comparative study of performance measurement standards of railway operator

    Directory of Open Access Journals (Sweden)

    Pongjirawut Siripong

    2017-01-01

    Full Text Available The European standard (EN 13816, is one of the widely accepted standards for measuring the quality of public passenger transport (PPT service. EN 13816 indicates 8 measurement criteria, 29 sub-criteria and 193 Key Performance Indicators (KPIs to be used to measure the performance of railway operators. Nowadays, there are other addition criteria beyond EN13816, developed by various organisations. This research firstly aims to explore the service performance measurement of railway operators used by actual railway operators at international level and in Thailand. After an intensive review of performance measurement standards, 9 standards are compiled and compared in terms of criteria, sub-criteria and KPIs using a cluster analysis methodology. The result found additional performance measurement aspects at 2 sub-criteria and 91 KPIs in addition to EN 13816. This research summarized and compared different performance measurement standards to measure service quality of metro rail line.

  12. Initial operation and performance of the PDX neutral-beam injection system

    International Nuclear Information System (INIS)

    Kugel, H.W.; Eubank, H.P.; Kozub, T.A.; Rossmassler, J.E.; Schilling, G.; van Halle, A.; Williams, M.D.

    1982-01-01

    In 1981, the joint ORNL/PPPL PDX neutral beam heating project succeeded in reliably injecting 7.2 MW of D 0 into the PDX plasma, at nearly perpendicular angles, and achieved ion temperatures up to 6.5 keV. The expeditious achievement of this result was due to the thorough conditioning and qualification of the PDX neutral beam ion sources at ORNL prior to delivery coupled with several field design changes and improvements in the injection system made at PPPL as a result of neutral beam operating experience with the PLT tokamak. It has been found that the operation of high power neutral beam injection systems in a tokamak-neutral beam environment requires procedures and performance different from those required for development operation on test stands. In this paper, we review the installatin of the PDX neutral beam injection system, and its operation and performance during the initial high power plasma heating experiments with the PDX tokamak

  13. MAPPS (Maintenance Personnel Performance Simulation): a computer simulation model for human reliability analysis

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.

    1985-01-01

    A computer model has been developed, sensitivity tested, and evaluated capable of generating reliable estimates of human performance measures in the nuclear power plant (NPP) maintenance context. The model, entitled MAPPS (Maintenance Personnel Performance Simulation), is of the simulation type and is task-oriented. It addresses a number of person-machine, person-environment, and person-person variables and is capable of providing the user with a rich spectrum of important performance measures including mean time for successful task performance by a maintenance team and maintenance team probability of task success. These two measures are particularly important for input to probabilistic risk assessment (PRA) studies which were the primary impetus for the development of MAPPS. The simulation nature of the model along with its generous input parameters and output variables allows its usefulness to extend beyond its input to PRA

  14. 44 ICT's, Service Delivery and Operational Performance in Nigerian ...

    African Journals Online (AJOL)

    User

    2011-07-21

    Jul 21, 2011 ... influencing performance in organizations. This paper ... banking industry based on the fact that the main function of banks can be viewed not ..... adoption of IT devices on banks operations using both structural analyses and.

  15. Facets of operational performance in an emergency room (ER)

    NARCIS (Netherlands)

    van der Vaart, Taco; Vastag, Gyula; Wijngaard, Jacob

    This paper, using detailed time measurements of patients complemented by interviews with hospital management and staff, examines three facets of an emergency room's (ER) operational performance: (1) effectiveness of the triage system in rationing patient treatment; (2) factors influencing ER's

  16. Energy and Exergy Performance of three FPSO Operational Modes

    DEFF Research Database (Denmark)

    Sánchez, Yamid Alberto Carranza; Junior, Silvio de Oliveira; da Silva, Julio Augusto Mendes

    2015-01-01

    by the FPSO operator. Energy and exergy criteria have been applied to evaluate and compare the performance of components and systems of the three operational modes of the FPSO. The processing and utilities plants have been modeled and simulated by using Aspen HYSYS®. Results indicate that higher oil content...

  17. Identification of human operator performance models utilizing time series analysis

    Science.gov (United States)

    Holden, F. M.; Shinners, S. M.

    1973-01-01

    The results of an effort performed by Sperry Systems Management Division for AMRL in applying time series analysis as a tool for modeling the human operator are presented. This technique is utilized for determining the variation of the human transfer function under various levels of stress. The human operator's model is determined based on actual input and output data from a tracking experiment.

  18. The BaBar detector: Upgrades, operation and performance

    Energy Technology Data Exchange (ETDEWEB)

    Aubert, B.; Barate, R.; Boutigny, D.; Couderc, F.; del Amo Sanchez, P.; Gaillard, J. -M.; Hicheur, A.; Karyotakis, Y.; Lees, J. P.; Poireau, V.; Prudent, X.; Robbe, P.; Tisserand, V.; Zghiche, A.; Grauges, E.; Garra Tico, J.; Lopez, L.; Martinelli, M.; Palano, A.; Pappagallo, M.; Pompili, A.; Chen, G. P.; Chen, J. C.; Qi, N. D.; Rong, G.; Wang, P.; Zhu, Y. S.; Eigen, G.; Stugu, B.; Sun, L.; Abrams, G. S.; Battaglia, M.; Borgland, A. W.; Breon, A. B.; Brown, D. N.; Button-Shafer, J.; Cahn, R. N.; Charles, E.; Clark, A. R.; Day, C. T.; Furman, M.; Gill, M. S.; Groysman, Y.; Jacobsen, R. G.; Kadel, R. W.; Kadyk, J. A.; Kerth, L. T.; Kolomensky, Yu. G.; Kral, J. F.; Kukartsev, G.; LeClerc, C.; Levi, M. E.; Lynch, G.; Merchant, A. M.; Mir, L. M.; Oddone, P. J.; Orimoto, T. J.; Osipenkov, I. L.; Pripstein, M.; Roe, N. A.; Romosan, A.; Ronan, M. T.; Shelkov, V. G.; Suzuki, A.; Tackmann, K.; Tanabe, T.; Wenzel, W. A.; Zisman, M.; Barrett, M.; Bright-Thomas, P. G.; Ford, K. E.; Harrison, T. J.; Hart, A. J.; Hawkes, C. M.; Knowles, D. J.; Morgan, S. E.; O' Neale, S. W.; Penny, R. C.; Smith, D.; Soni, N.; Watson, A. T.; Watson, N. K.; Goetzen, K.; Held, T.; Koch, H.; Kunze, M.; Lewandowski, B.; Pelizaeus, M.; Peters, K.; Schmuecker, H.; Schroeder, T.; Steinke, M.; Fella, A.; Antonioli, E.; Boyd, J. T.; Chevalier, N.; Cottingham, W. N.; Foster, B.; Mackay, C.; Walker, D.; Abe, K.; Asgeirsson, D. J.; Cuhadar-Donszelmann, T.; Fulsom, B. G.; Hearty, C.; Knecht, N. S.; Mattison, T. S.; McKenna, J. A.; Thiessen, D.; Khan, A.; Kyberd, P.; McKemey, A. K.; Randle-Conde, A.; Saleem, M.; Sherwood, D. J.; Teodorescu, L.; Blinov, V. E.; Bukin, A. D.; Buzykaev, A. R.; Druzhinin, V. P.; Golubev, V. B.; Korol, A. A.; Kravchenko, E. A.; Onuchin, A. P.; Serednyakov, S. I.; Skovpen, Yu. I.; Solodov, E. P.; Telnov, V. I.; Todyshev, K. Yu.; Yushkov, A. N.; Best, D. S.; Bondioli, M.; Bruinsma, M.; Chao, M.; Curry, S.; Eschrich, I.; Kirkby, D.; Lankford, A. J.; Mandelkern, M.; Martin, E. C.; McMahon, S.; Mommsen, R. K.; Stoker, D. P.; Abachi, S.; Buchanan, C.; Hartfiel, B. L.; Weinstein, A. J. R.; Atmacan, H.; Foulkes, S. D.; Gary, J. W.; Layter, J.; Liu, F.; Long, O.; Shen, B. C.; Vitug, G. M.; Wang, K.; Yasin, Z.; Zhang, L.; Hadavand, H. K.; Hill, E. J.; Paar, H. P.; Rahatlou, S.; Schwanke, U.; Sharma, V.; Berryhill, J. W.; Campagnari, C.; Cunha, A.; Dahmes, B.; Hong, T. M.; Kovalskyi, D.; Kuznetsova, N.; Levy, S. L.; Lu, A.; Mazur, M. A.; Richman, J. D.; Verkerke, W.; Beck, T. W.; Beringer, J.; Eisner, A. M.; Flacco, C. J.; Grillo, A. A.; Grothe, M.; Heusch, C. A.; Kroseberg, J.; Lockman, W. S.; Martinez, A. J.; Nesom, G.; Schalk, T.; Schmitz, R. E.; Schumm, B. A.; Seiden, A.; Spencer, E.; Spradlin, P.; Turri, M.; Walkowiak, W.; Wang, L.; Wilder, M.; Williams, D. C.; Wilson, M. G.; Winstrom, L. O.; Chen, E.; Cheng, C. H.; Doll, D. A.; Dorsten, M. P.; Dvoretskii, A.; Echenard, B.; Erwin, R. J.; Fang, F.; Flood, K.; Hitlin, D. G.; Metzler, S.; Narsky, I.; Oyang, J.; Piatenko, T.; Porter, F. C.; Ryd, A.; Samuel, A.; Yang, S.; Zhu, R. Y.; Andreassen, R.; Devmal, S.; Geld, T. L.; Jayatilleke, S.; Mancinelli, G.; Meadows, B. T.; Mishra, K.; Sokoloff, M. D.; Abe, T.; Antillon, E. A.; Barillari, T.; Becker, J.; Blanc, F.; Bloom, P. C.; Chen, S.; Clifton, Z. C.; Derrington, I. M.; Destree, J.; Dima, M. O.; Ford, W. T.; Gaz, A.; Gilman, J. D.; Hachtel, J.; Hirschauer, J. F.; Johnson, D. R.; Kreisel, A.; Nagel, M.; Nauenberg, U.; Olivas, A.; Rankin, P.; Roy, J.; Ruddick, W. O.; Smith, J. G.; Ulmer, K. A.; van Hoek, W. C.; Wagner, S. R.; West, C. G.; Zhang, J.; Ayad, R.; Blouw, J.; Chen, A.; Eckhart, E. A.; Harton, J. L.; Hu, T.; Toki, W. H.; Wilson, R. J.; Winklmeier, F.; Zeng, Q. L.; Altenburg, D.; Feltresi, E.; Hauke, A.; Jasper, H.; Karbach, M.; Merkel, J.; Petzold, A.; Spaan, B.; Wacker, K.; Brandt, T.; Brose, J.; Colberg, T.; Dahlinger, G.; Dickopp, M.; Eckstein, P.; Futterschneider, H.; Kaiser, S.; Kobel, M. J.; Krause, R.; Müller-Pfefferkorn, R.; Mader, W. F.; Maly, E.; Nogowski, R.; Otto, S.; Schubert, J.; Schubert, K. R.; Schwierz, R.; Sundermann, J. E.; Volk, A.; Wilden, L.; Bernard, D.; Brochard, F.; Cohen-Tanugi, J.; Dohou, F.; Ferrag, S.; Latour, E.; Mathieu, A.; Renard, C.; Schrenk, S.; T' Jampens, S.; Thiebaux, Ch.; Vasileiadis, G.; Verderi, M.; Anjomshoaa, A.; Bernet, R.; Clark, P. J.; Lavin, D. R.; Muheim, F.; Playfer, S.; Robertson, A. I.; Swain, J. E.; Watson, J. E.; Xie, Y.; Andreotti, D.; Andreotti, M.; Bettoni, D.; Bozzi, C.; Calabrese, R.; Carassiti, V.; Cecchi, A.; Cibinetto, G.; Cotta Ramusino, A.; Evangelisti, F.; Fioravanti, E.; Franchini, P.; Garzia, I.; Landi, L.; Luppi, E.; Malaguti, R.; Negrini, M.; Padoan, C.; Petrella, A.; Piemontese, L.; Santoro, V.; Sarti, A.; Anulli, F.; Baldini-Ferroli, R.; Calcaterra, A.; Finocchiaro, G.; Pacetti, S.; Patteri, P.; Peruzzi, I. M.; Piccolo, M.; Rama, M.; de Sangro, R.; Santoni, M.; Zallo, A.; Bagnasco, S.; Buzzo, A.; Capra, R.; Contri, R.; Crosetti, G.; Lo Vetere, M.; Macri, M. M.; Minutoli, S.; Monge, M. R.; Musico, P.; Passaggio, S.; Pastore, F. C.; Patrignani, C.; Pia, M. G.; Robutti, E.; Santroni, A.; Tosi, S.; Bhuyan, B.; Prasad, V.; Bailey, S.; Brandenburg, G.; Chaisanguanthum, K. S.; Lee, C. L.; Morii, M.; Won, E.; Wu, J.; Adametz, A.; Dubitzky, R. S.; Marks, J.; Schenk, S.; Uwer, U.; Klose, V.; Lacker, H. M.; Aspinwall, M. L.; Bhimji, W.; Bowerman, D. A.; Dauncey, P. D.; Egede, U.; Flack, R. L.; Gaillard, J. R.; Gunawardane, N. J. W.; Morton, G. W.; Nash, J. A.; Nikolich, M. B.; Panduro Vazquez, W.; Sanders, P.; Smith, D.; Taylor, G. P.; Tibbetts, M.; Behera, P. K.; Chai, X.; Charles, M. J.; Grenier, G. J.; Hamilton, R.; Lee, S. -J.; Mallik, U.; Meyer, N. T.; Chen, C.; Cochran, J.; Crawley, H. B.; Dong, L.; Eyges, V.; Fischer, P. -A.; Lamsa, J.; Meyer, W. T.; Prell, S.; Rosenberg, E. I.; Rubin, A. E.; Gao, Y. Y.; Gritsan, A. V.; Guo, Z. J.; Lae, C. K.; Schott, G.; Albert, J. N.; Arnaud, N.; Beigbeder, C.; Breton, D.; Davier, M.; Derkach, D.; Dû, S.; Firmino da Costa, J.; Grosdidier, G.; Höcker, A.; Laplace, S.; Le Diberder, F.; Lepeltier, V.; Lutz, A. M.; Malaescu, B.; Nief, J. Y.; Petersen, T. C.; Plaszczynski, S.; Pruvot, S.; Roudeau, P.; Schune, M. H.; Serrano, J.; Sordini, V.; Stocchi, A.; Tocut, V.; Trincaz-Duvoid, S.; Wang, L. L.; Wormser, G.; Bionta, R. M.; Brigljević, V.; Lange, D. J.; Simani, M. C.; Wright, D. M.; Bingham, I.; Burke, J. P.; Chavez, C. A.; Coleman, J. P.; Forster, I. J.; Fry, J. R.; Gabathuler, E.; Gamet, R.; George, M.; Hutchcroft, D. E.; Kay, M.; Parry, R. J.; Payne, D. J.; Schofield, K. C.; Sloane, R. J.; Touramanis, C.; Azzopardi, D. E.; Bellodi, G.; Bevan, A. J.; Clarke, C. K.; Cormack, C. M.; Di Lodovico, F.; Dixon, P.; George, K. A.; Menges, W.; Potter, R. J. L.; Sacco, R.; Shorthouse, H. W.; Sigamani, M.; Strother, P.; Vidal, P. B.; Brown, C. L.; Cowan, G.; Flaecher, H. U.; George, S.; Green, M. G.; Hopkins, D. A.; Jackson, P. S.; Kurup, A.; Marker, C. E.; McGrath, P.; McMahon, T. R.; Paramesvaran, S.; Salvatore, F.; Vaitsas, G.; Winter, M. A.; Wren, A. C.; Brown, D. N.; Davis, C. L.; Denig, A. G.; Fritsch, M.; Gradl, W.; Griessinger, K.; Hafner, A.; Prencipe, E.; Allison, J.; Alwyn, K. E.; Bailey, D. S.; Barlow, N. R.; Barlow, R. J.; Chia, Y. M.; Edgar, C. L.; Forti, A. C.; Fullwood, J.; Hart, P. A.; Hodgkinson, M. C.; Jackson, F.; Jackson, G.; Kelly, M. P.; Kolya, S. D.; Lafferty, G. D.; Lyon, A. J.; Naisbit, M. T.; Savvas, N.; Weatherall, J. H.; West, T. J.; Williams, J. C.; Yi, J. I.; Anderson, J.; Farbin, A.; Hulsbergen, W. D.; Jawahery, A.; Lillard, V.; Roberts, D. A.; Schieck, J. R.; Simi, G.; Tuggle, J. M.; Blaylock, G.; Dallapiccola, C.; Hertzbach, S. S.; Kofler, R.; Koptchev, V. B.; Li, X.; Moore, T. B.; Salvati, E.; Saremi, S.; Staengle, H.; Willocq, S. Y.; Cowan, R.; Dujmic, D.; Fisher, P. H.; Henderson, S. W.; Koeneke, K.; Lang, M. I.; Sciolla, G.; Spitznagel, M.; Taylor, F.; Yamamoto, R. K.; Yi, M.; Zhao, M.; Zheng, Y.; Klemetti, M.; Lindemann, D.; Mangeol, D. J. J.; Mclachlin, S. E.; Milek, M.; Patel, P. M.; Robertson, S. H.; Biassoni, P.; Cerizza, G.; Lazzaro, A.; Lombardo, V.; Neri, N.; Palombo, F.; Pellegrini, R.; Stracka, S.; Bauer, J. M.; Cremaldi, L.; Eschenburg, V.; Kroeger, R.; Reidy, J.; Sanders, D. A.; Summers, D. J.; Zhao, H. W.; Godang, R.; Brunet, S.; Cote, D.; Nguyen, X.; Simard, M.; Taras, P.; Viaud, B.; Nicholson, H.; Cavallo, N.; De Nardo, G.; Fabozzi, F.; Gatto, C.; Lista, L.; Monorchio, D.; Onorato, G.; Paolucci, P.; Piccolo, D.; Sciacca, C.; Baak, M. A.; Raven, G.; Snoek, H. L.; Jessop, C. P.; Knoepfel, K. J.; LoSecco, J. M.; Wang, W. F.; Allmendinger, T.; Benelli, G.; Brau, B.; Corwin, L. A.; Gan, K. K.; Honscheid, K.; Hufnagel, D.; Kagan, H.; Kass, R.; Morris, J. P.; Rahimi, A. M.; Regensburger, J. J.; Smith, D. S.; Ter-Antonyan, R.; Wong, Q. K.; Blount, N. L.; Brau, J.; Frey, R.; Igonkina, O.; Iwasaki, M.; Kolb, J. A.; Lu, M.; Potter, C. T.; Rahmat, R.; Sinev, N. B.; Strom, D.; Strube, J.; Torrence, E.; Borsato, E.; Castelli, G.; Colecchia, F.; Crescente, A.; Dal Corso, F.; Dorigo, A.; Fanin, C.; Furano, F.; Gagliardi, N.; Galeazzi, F.; Margoni, M.; Marzolla, M.; Michelon, G.; Morandin, M.; Posocco, M.; Rotondo, M.; Simonetto, F.; Solagna, P.; Stevanato, E.; Stroili, R.; Tiozzo, G.; Voci, C.; Akar, S.; Bailly, P.; Ben-Haim, E.; Bonneaud, G.; Briand, H.; Chauveau, J.; Hamon, O.; John, M. J. J.; Lebbolo, H.; Leruste, Ph.; Malclès, J.; Marchiori, G.; Martin, L.; Ocariz, J.; Perez, A.; Pivk, M.; Prendki, J.; Roos, L.; Sitt, S.; Stark, J.; Thérin, G.; Vallereau, A.; Biasini, M.; Covarelli, R.; Manoni, E.; Pennazzi, S.; Pioppi, M.; Angelini, C.; Batignani, G.; Bettarini, S.; Bosi, F.; Bucci, F.; Calderini, G.; Carpinelli, M.; Cenci, R.; Cervelli, A.; Forti, F.; Giorgi, M. A.; Lusiani, A.; Marchiori, G.; Morganti, M.; Morsani, F.; Paoloni, E.; Raffaelli, F.; Rizzo, G.; Sandrelli, F.; Triggiani, G.; Walsh, J. J.; Haire, M.; Judd, D.; Biesiada, J.; Danielson, N.; Elmer, P.; Fernholz, R. E.; Lau, Y. P.; Lu, C.; Miftakov, V.; Olsen, J.; Lopes Pegna, D.; Sands, W. R.; Smith, A. J. S.; Telnov, A. V.; Tumanov, A.; Varnes, E. W.; Baracchini, E.; Bellini, F.; Bulfon, C.; Buccheri, E.; Cavoto, G.; D' Orazio, A.; Di Marco, E.; Faccini, R.; Ferrarotto, F.; Ferroni, F.; Gaspero, M.; Jackson, P. D.; Lamanna, E.; Leonardi, E.; Li Gioi, L.; Lunadei, R.; Mazzoni, M. A.; Morganti, S.; Piredda, G.; Polci, F.; del Re, D.; Renga, F.; Safai Tehrani, F.; Serra, M.; Voena, C.; Bünger, C.; Christ, S.; Hartmann, T.; Leddig, T.; Schröder, H.; Wagner, G.; Waldi, R.; Adye, T.; Bly, M.; Brew, C.; Condurache, C.; De Groot, N.; Franek, B.; Geddes, N. I.; Gopal, G. P.; Olaiya, E. O.; Ricciardi, S.; Roethel, W.; Wilson, F. F.; Xella, S. M.; Aleksan, R.; Bourgeois, P.; Emery, S.; Escalier, M.; Esteve, L.; Gaidot, A.; Ganzhur, S. F.; Giraud, P. -F.; Georgette, Z.; Graziani, G.; Hamel de Monchenault, G.; Kozanecki, W.; Langer, M.; Legendre, M.; London, G. W.; Mayer, B.; Micout, P.; Serfass, B.; Vasseur, G.; Yèche, Ch.; Zito, M.; Allen, M. T.; Akre, R.; Aston, D.; Azemoon, T.; Bard, D. J.; Bartelt, J.; Bartoldus, R.; Bechtle, P.; Becla, J.; Benitez, J. F.; Berger, N.; Bertsche, K.; Boeheim, C. T.; Bouldin, K.; Boyarski, A. M.; Boyce, R. F.; Browne, M.; Buchmueller, O. L.; Burgess, W.; Cai, Y.; Cartaro, C.; Ceseracciu, A.; Claus, R.; Convery, M. R.; Coupal, D. P.; Craddock, W. W.; Crane, G.; Cristinziani, M.; DeBarger, S.; Decker, F. J.; Dingfelder, J. C.; Donald, M.; Dorfan, J.; Dubois-Felsmann, G. P.; Dunwoodie, W.; Ebert, M.; Ecklund, S.; Erickson, R.; Fan, S.; Field, R. C.; Fisher, A.; Fox, J.; Franco Sevilla, M.; Fulsom, B. G.; Gabareen, A. M.; Gaponenko, I.; Glanzman, T.; Gowdy, S. J.; Graham, M. T.; Grenier, P.; Hadig, T.; Halyo, V.; Haller, G.; Hamilton, J.; Hanushevsky, A.; Hasan, A.; Hast, C.; Hee, C.; Himel, T.; Hryn' ova, T.; Huffer, M. E.; Hung, T.; Innes, W. R.; Iverson, R.; Kaminski, J.; Kelsey, M. H.; Kim, H.; Kim, P.; Kharakh, D.; Kocian, M. L.; Krasnykh, A.; Krebs, J.; Kroeger, W.; Kulikov, A.; Kurita, N.; Langenegger, U.; Leith, D. W. G. S.; Lewis, P.; Li, S.; Libby, J.; Lindquist, B.; Luitz, S.; Lüth, V.; Lynch, H. L.; MacFarlane, D. B.; Marsiske, H.; McCulloch, M.; McDonald, J.; Melen, R.; Menke, S.; Metcalfe, S.; Messner, R.; Moss, L. J.; Mount, R.; Muller, D. R.; Neal, H.; Nelson, D.; Nelson, S.; Nordby, M.; Nosochkov, Y.; Novokhatski, A.; O' Grady, C. P.; O' Neill, F. G.; Ofte, I.; Ozcan, V. E.; Perazzo, A.; Perl, M.; Petrak, S.; Piemontese, M.; Pierson, S.; Pulliam, T.; Ratcliff, B. N.; Ratkovsky, S.; Reif, R.; Rivetta, C.; Rodriguez, R.; Roodman, A.; Salnikov, A. A.; Schietinger, T.; Schindler, R. H.; Schwarz, H.; Schwiening, J.; Seeman, J.; Smith, D.; Snyder, A.; Soha, A.; Stanek, M.; Stelzer, J.; Su, D.; Sullivan, M. K.; Suzuki, K.; Swain, S. K.; Tanaka, H. A.; Teytelman, D.; Thompson, J. M.; Tinslay, J. S.; Trunov, A.; Turner, J.; van Bakel, N.; van Winkle, D.; Va' vra, J.; Wagner, A. P.; Weaver, M.; Weinstein, A. J. R.; Weber, T.; West, C. A.; Wienands, U.; Wisniewski, W. J.; Wittgen, M.; Wittmer, W.; Wright, D. H.; Wulsin, H. W.; Yan, Y.; Yarritu, A. K.; Yi, K.; Yocky, G.; Young, C. C.; Ziegler, V.; Chen, X. R.; Liu, H.; Park, W.; Purohit, M. V.; Singh, H.; Weidemann, A. W.; White, R. M.; Wilson, J. R.; Yumiceva, F. X.; Sekula, S. J.; Bellis, M.; Burchat, P. R.; Edwards, A. J.; Majewski, S. A.; Meyer, T. I.; Miyashita, T. S.; Petersen, B. A.; Roat, C.; Ahmed, M.; Ahmed, S.; Alam, M. S.; Bula, R.; Ernst, J. A.; Jain, V.; Liu, J.; Pan, B.; Saeed, M. A.; Wappler, F. R.; Zain, S. B.; Gorodeisky, R.; Guttman, N.; Peimer, D.; Soffer, A.; De Silva, A.; Lund, P.; Krishnamurthy, M.; Ragghianti, G.; Spanier, S. M.; Wogsland, B. J.; Eckmann, R.; Ritchie, J. L.; Ruland, A. M.; Satpathy, A.; Schilling, C. J.; Schwitters, R. F.; Wray, B. C.; Drummond, B. W.; Izen, J. M.; Kitayama, I.; Lou, X. C.; Ye, S.; Bianchi, F.; Bona, M.; Gallo, F.; Gamba, D.; Pelliccioni, M.; Bomben, M.; Borean, C.; Bosisio, L.; Cossutti, F.; Della Ricca, G.; Dittongo, S.; Grancagnolo, S.; Lanceri, L.; Poropat, P.; Rashevskaya, I.; Vitale, L.; Vuagnin, G.; Manfredi, P. F.; Re, V.; Speziali, V.; Frank, E. D.; Gladney, L.; Guo, Q. H.; Panetta, J.; Azzolini, V.; Lopez-March, N.; Martinez-Vidal, F.; Milanes, D. A.; Oyanguren, A.; Agarwal, A.; Albert, J.; Banerjee, Sw.; Bernlochner, F. U.; Brown, C. M.; Choi, H. H. F.; Fortin, D.; Fransham, K. B.; Hamano, K.; Kowalewski, R.; Lewczuk, M. J.; Nugent, I. M.; Roney, J. M.; Sobie, R. J.; Back, J. J.; Gershon, T. J.; Harrison, P. F.; Ilic, J.; Latham, T. E.; Mohanty, G. B.; Puccio, E.; Band, H. R.; Chen, X.; Cheng, B.; Dasu, S.; Datta, M.; Eichenbaum, A. M.; Hollar, J. J.; Hu, H.; Johnson, J. R.; Kutter, P. E.; Li, H.; Liu, R.; Mellado, B.; Mihalyi, A.; Mohapatra, A. K.; Pan, Y.; Pierini, M.; Prepost, R.; Scott, I. J.; Tan, P.; Vuosalo, C. O.; von Wimmersperg-Toeller, J. H.; Wu, S. L.; Yu, Z.; Greene, M. G.; Kordich, T. M. B.

    2013-11-01

    The BaBar detector operated successfully at the PEP-II asymmetric e+e- collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking.

  19. Operational risk assessments by supply chain professionals : process and performance

    NARCIS (Netherlands)

    Tazelaar, F.; Snijders, C.C.P.

    2013-01-01

    We consider the "process-performance paradox" in the assessment of operational risks by professionals in the field of operations and supply chain management (OSCM). The paradox states that although professionals with more expertise tend to decide in different ways, they often do not make better

  20. Inter- and intra-operator reliability and repeatability of shear wave elastography in the liver: a study in healthy volunteers.

    Science.gov (United States)

    Hudson, John M; Milot, Laurent; Parry, Craig; Williams, Ross; Burns, Peter N

    2013-06-01

    This study assessed the reproducibility of shear wave elastography (SWE) in the liver of healthy volunteers. Intra- and inter-operator reliability and repeatability were quantified in three different liver segments in a sample of 15 subjects, scanned during four independent sessions (two scans on day 1, two scans 1 wk later) by two operators. A total of 1440 measurements were made. Reproducibility was assessed using the intra-class correlation coefficient (ICC) and a repeated measures analysis of variance. The shear wave speed was measured and used to estimate Young's modulus using the Supersonics Imagine Aixplorer. The median Young's modulus measured through the inter-costal space was 5.55 ± 0.74 kPa. The intra-operator reliability was better for same-day evaluations (ICC = 0.91) than the inter-operator reliability (ICC = 0.78). Intra-observer agreement decreased when scans were repeated on a different day. Inter-session repeatability was between 3.3% and 9.9% for intra-day repeated scans, compared with to 6.5%-12% for inter-day repeated scans. No significant difference was observed in subjects with a body mass index greater or less than 25 kg/m(2). Copyright © 2013 World Federation for Ultrasound in Medicine & Biology. Published by Elsevier Inc. All rights reserved.

  1. The reliability and validity of a soccer-specific nonmotorised treadmill simulation (intermittent soccer performance test).

    Science.gov (United States)

    Aldous, Jeffrey W F; Akubat, Ibrahim; Chrismas, Bryna C R; Watkins, Samuel L; Mauger, Alexis R; Midgley, Adrian W; Abt, Grant; Taylor, Lee

    2014-07-01

    This study investigated the reliability and validity of a novel nonmotorised treadmill (NMT)-based soccer simulation using a novel activity category called a "variable run" to quantify fatigue during high-speed running. Twelve male University soccer players completed 3 familiarization sessions and 1 peak speed assessment before completing the intermittent soccer performance test (iSPT) twice. The 2 iSPTs were separated by 6-10 days. The total distance, sprint distance, and high-speed running distance (HSD) were 8,968 ± 430 m, 980 ± 75 m and 2,122 ± 140 m, respectively. No significant difference (p > 0.05) was found between repeated trials of the iSPT for all physiological and performance variables. Reliability measures between iSPT1 and iSPT2 showed good agreement (coefficient of variation: 0.80). Furthermore, the variable run phase showed HSD significantly decreased (p ≤ 0.05) in the last 15 minutes (89 ± 6 m) compared with the first 15 minutes (85 ± 7 m), quantifying decrements in high-speed exercise compared with the previous literature. This study validates the iSPT as a NMT-based soccer simulation compared with the previous match-play data and is a reliable tool for assessing and monitoring physiological and performance variables in soccer players. The iSPT could be used in a number of ways including player rehabilitation, understanding the efficacy of nutritional interventions, and also the quantification of environmentally mediated decrements on soccer-specific performance.

  2. An integrated methodology for the dynamic performance and reliability evaluation of fault-tolerant systems

    International Nuclear Information System (INIS)

    Dominguez-Garcia, Alejandro D.; Kassakian, John G.; Schindall, Joel E.; Zinchuk, Jeffrey J.

    2008-01-01

    We propose an integrated methodology for the reliability and dynamic performance analysis of fault-tolerant systems. This methodology uses a behavioral model of the system dynamics, similar to the ones used by control engineers to design the control system, but also incorporates artifacts to model the failure behavior of each component. These artifacts include component failure modes (and associated failure rates) and how those failure modes affect the dynamic behavior of the component. The methodology bases the system evaluation on the analysis of the dynamics of the different configurations the system can reach after component failures occur. For each of the possible system configurations, a performance evaluation of its dynamic behavior is carried out to check whether its properties, e.g., accuracy, overshoot, or settling time, which are called performance metrics, meet system requirements. Markov chains are used to model the stochastic process associated with the different configurations that a system can adopt when failures occur. This methodology not only enables an integrated framework for evaluating dynamic performance and reliability of fault-tolerant systems, but also enables a method for guiding the system design process, and further optimization. To illustrate the methodology, we present a case-study of a lateral-directional flight control system for a fighter aircraft

  3. Individual styles of professional operator's performance for the needs of interplanetary mission.

    Science.gov (United States)

    Boritko, Yaroslav; Gushin, Vadim; Zavalko, Irina; Smoleevskiy, Alexandr; Dudukin, Alexandr

    Maintenance of the cosmonaut’s professional performance reliability is one of the priorities of long-term space flights safety. Cosmonaut’s performance during long-term space flight decreases due to combination of the microgravity effects and inevitable degradation of skills during prolonged breaks in training. Therefore, the objective of the elaboration of countermeasures against skill decrement is very relevant. During the experiment with prolonged isolation "Mars-500" in IMBP two virtual models of professional operator’s activities were used to investigate the influence of extended isolation, monotony and confinement on professional skills degradation. One is well-known “PILOT-1” (docking to the space station), another - "VIRTU" (manned operations of planet exploration). Individual resistance to the artificial sensory conflict was estimated using computerized version of “Mirror koordinograf” with GSR registration. Two different individual performance styles, referring to the different types of response to stress, have been identified. Individual performance style, called "conservative control", manifested in permanent control of parameters, conditions and results of the operator’s activity. Operators with this performance style demonstrate high reliability in performing tasks. The drawback of the style is intensive resource expenditure - both the operator (physiological "cost") and the technical system operated (fuel, time). This style is more efficient while executing tasks that require long work with high reliability required according to a detailed protocol, such as orbital flight. Individual style, called "exploratory ", manifested in the search of new ways of task fulfillment. This style is accompanied by partial, periodic lack of control of the conditions and result of operator’s activity due to flexible approach to the tasks perfect implementation. Operators spent less resource (fuel, time, lower physiological "cost") due to high self

  4. Applying lessons learned to enhance human performance and reduce human error for ISS operations

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, W.R.

    1998-09-01

    A major component of reliability, safety, and mission success for space missions is ensuring that the humans involved (flight crew, ground crew, mission control, etc.) perform their tasks and functions as required. This includes compliance with training and procedures during normal conditions, and successful compensation when malfunctions or unexpected conditions occur. A very significant issue that affects human performance in space flight is human error. Human errors can invalidate carefully designed equipment and procedures. If certain errors combine with equipment failures or design flaws, mission failure or loss of life can occur. The control of human error during operation of the International Space Station (ISS) will be critical to the overall success of the program. As experience from Mir operations has shown, human performance plays a vital role in the success or failure of long duration space missions. The Department of Energy`s Idaho National Engineering and Environmental Laboratory (INEEL) is developed a systematic approach to enhance human performance and reduce human errors for ISS operations. This approach is based on the systematic identification and evaluation of lessons learned from past space missions such as Mir to enhance the design and operation of ISS. This paper describes previous INEEL research on human error sponsored by NASA and how it can be applied to enhance human reliability for ISS.

  5. Investigations of Cutting Fluid Performance Using Different Machining Operations

    DEFF Research Database (Denmark)

    De Chiffre, Leonardo; Belluco, Walter

    2002-01-01

    An analysis of cutting fluid performance in dif-ferent metal cutting operations is presented based on performance criteria, work material and fluid type. Cutting fluid performance was evaluated in turning, drilling, reaming and tapping operations, with respect to tool life, cutting forces and prod...... will get the same performance ranking for different metalworking fluids no matter what machining test is used, when the fluids are of the same type. Results show that this is mostly true for the water-based fluids on austenitic stainless steel while ranking did change depending on the test with straight......-gated. In the case of austenitic stainless steel as the workpiece material, results using the different operations under different cutting conditions show that the performance of vegetable oil based prod-ucts is superior or equal to that of mineral oil based products. The hypothesis was investigated that one...

  6. A Quantitative Risk Analysis Framework for Evaluating and Monitoring Operational Reliability of Cloud Computing

    Science.gov (United States)

    Islam, Muhammad Faysal

    2013-01-01

    Cloud computing offers the advantage of on-demand, reliable and cost efficient computing solutions without the capital investment and management resources to build and maintain in-house data centers and network infrastructures. Scalability of cloud solutions enable consumers to upgrade or downsize their services as needed. In a cloud environment,…

  7. Emotional-volitional components of operator reliability. [sensorimotor function testing under stress

    Science.gov (United States)

    Mileryan, Y. A.

    1975-01-01

    Sensorimotor function testing in a tracking task under stressfull working conditions established a psychological characterization for a successful aviation pilot: Motivation significantly increased the reliability and effectiveness of their work. Their acitivities were aimed at suppressing weariness and the feeling of fear caused by the stress factors; they showed patience, endurance, persistence, and a capacity for lengthy volitional efforts.

  8. Towards an Operational Definition of Effective Co-Teaching: Instrument Development, Validity, and Reliability

    Science.gov (United States)

    La Monte, Michelle Evonne

    2012-01-01

    This study focused on developing a valid and reliable instrument that can not only identify successful co-teaching, but also the professional development needs of co-teachers and their administrators in public schools. Two general questions about the quality of co-teaching were addressed in this study: (a) How well did descriptors within each of…

  9. “Crossing over”: appropriate private sector principles, to operate more reliable public sector water services

    Directory of Open Access Journals (Sweden)

    Kevin Wall

    2008-04-01

    Full Text Available Private sector institutions utilise many different business methods, some of which can selectively be adapted for use by organisations outside the private sector, to the benefit of their service delivery responsibilities. But the best of the appropriate practices from the private sector have often “not crossed over”. The Water Research Commission (WRC of South Africa, working in collaboration with the Council for Scientific and Industrial Research (CSIR, finds that the concept of franchising, so successfully used by the private sector to deliver many goods and services, if applied to water services operation and maintenance, could alleviate and address many challenges in the management of water services. At the same time, franchising could provide an ideal stimulus to support the development of local enterprises, all within the municipal service delivery environment. Franchisee water service providers, dependent for their livelihood on the success of their business, would have a strong incentive to perform, and would also enjoy the benefit of the franchisor’s expert guidance and quality assurance. Some areas for potential franchising include meter management, billing, plumbing, pressure management, sewer maintenance, and wastewater treatment processes. The help from the franchisor would be of particular value to water services authorities at a distance from the major urban centres. Few of these authorities can afford to employ competent qualified staff, and often non-compliance with the laid down performance standards is a direct consequence of this lack. Significant improvements would soon be seen if the generally under-qualified and under-resourced water services staff could have this ongoing support, mentoring and quality control — or if the authority could enter into partnerships with small local enterprises or NGOs which would, through franchising, enjoy the necessary ongoing support, mentoring and quality control, and would have

  10. PERFORMANCE-RELIABILITY – THE MAIN SUBJECT OF THE BANKING ANALYSIS OF THE CREDITED SOCIETIES

    Directory of Open Access Journals (Sweden)

    AVRAM (BOITOŞ CAMELIA

    2013-12-01

    Full Text Available Since the crediting activity occupies the primary role in any banking institution, the necessity of study and its analysis is required by following some steps both at a microeconomic level and at a macroeconomic one. Going over the theme, which aims at the importance of a thorough study of the clients' reliability for highlighting the existing risks in the banking activity in general, and particularly in the crediting activity, becomes as more interesting as their approach at the level of the member states of the European Union tends towards a common theme. Starting from these premises, we have considered as being extremely important the selection of a research theme which aims at the risks in the crediting activity, emphasizing the analysis of the clients' reliability both in the decision of crediting in order to assume the risk of credit and in determining the financial and banking performances. Being given the complexity of the existing risks in the banking activity in general and particularly of the credit risk, the clients' reliability represents an extremely important field, of research and application, bearing in mind both the actual stage of developing the Romanian banking system and the attempts of its alignment to the requirements imposed by the European Union.

  11. Design for High Performance, Low Power, and Reliable 3D Integrated Circuits

    CERN Document Server

    Lim, Sung Kyu

    2013-01-01

    This book describes the design of through-silicon-via (TSV) based three-dimensional integrated circuits.  It includes details of numerous “manufacturing-ready” GDSII-level layouts of TSV-based 3D ICs, developed with tools covered in the book. Readers will benefit from the sign-off level analysis of timing, power, signal integrity, and thermo-mechanical reliability for 3D IC designs.  Coverage also includes various design-for-manufacturability (DFM), design-for-reliability (DFR), and design-for-testability (DFT) techniques that are considered critical to the 3D IC design process. Describes design issues and solutions for high performance and low power 3D ICs, such as the pros/cons of regular and irregular placement of TSVs, Steiner routing, buffer insertion, low power 3D clock routing, power delivery network design and clock design for pre-bond testability. Discusses topics in design-for-electrical-reliability for 3D ICs, such as TSV-to-TSV coupling, current crowding at the wire-to-TSV junction and the e...

  12. Developing of Individual Instrument Performance Anxiety Scale: ValidityReliability Study

    Directory of Open Access Journals (Sweden)

    Esra DALKIRAN

    2016-07-01

    Full Text Available In this study, it is intended to develop a scale unique to our culture, concerning individual instrument performance anxiety of the students who are getting instrument training in the Department of Music Education. In the study, the descriptive research model is used and qualitative research techniques are utilized. The study population consists of the students attending the 23 universities which has Music Education Department. The sample of the study consists of 438 girls and 312 boys, totally 750 students who are studying in the Department of Music Education of randomly selected 10 universities. As a result of the explanatory and confirmatory factor analyses that were performed, a onedimensional structure consisting of 14 items was obtained. Also, t-scores and the coefficient scores of total item correlation concerning the distinguishing power of the items, the difference in the scores of the set of lower and upper 27% was calculated, and it was observed that the items are distinguishing as a result of both analyses. Of the scale, Cronbach's alpha coefficient of internal consistency was calculated as .94, and test-retest reliability coefficient was calculated as .93. As a result, a valid and reliable assessment and evaluation instrument that measures the exam performance anxiety of the students studying in the Department of Music Education, has been developed.

  13. Reliability and efficiency upgrades of power systems operation by implementing intelligent electronic devices with synchrophasor measurement technology support

    Directory of Open Access Journals (Sweden)

    Mokeev Alexey

    2017-01-01

    Full Text Available This paper reviews issues of reliability and efficiency upgrades of power systems functions by means of a widespread implementation of intelligent electronic devices (IED in various purposes supporting synchrophasor measurement technology. Thus, such issues as IED’s operational analysis in the conditions of electromagnetic and electromechanical transient processes and synthesis of digital filters that improve static and dynamic responses of these devices play an important role in their development.

  14. Reliability and efficiency upgrades of power systems operation by implementing intelligent electronic devices with synchrophasor measurement technology support

    OpenAIRE

    Mokeev Alexey

    2017-01-01

    This paper reviews issues of reliability and efficiency upgrades of power systems functions by means of a widespread implementation of intelligent electronic devices (IED) in various purposes supporting synchrophasor measurement technology. Thus, such issues as IED’s operational analysis in the conditions of electromagnetic and electromechanical transient processes and synthesis of digital filters that improve static and dynamic responses of these devices play an important role in their devel...

  15. Performance and Reliability of Bonded Interfaces for High-Temperature Packaging (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Devoto, D.

    2014-11-01

    The thermal performance and reliability of sintered-silver is being evaluated for power electronics packaging applications. This will be experimentally accomplished by the synthesis of large-area bonded interfaces between metalized substrates that will be subsequently subjected to thermal cycles. A finite element model of crack initiation and propagation in these bonded interfaces will allow for the interpretation of degradation rates by a crack-velocity (V)-stress intensity factor (K) analysis. The experiment is outlined, and the modeling approach is discussed.

  16. PyOperators: Operators and solvers for high-performance computing

    Science.gov (United States)

    Chanial, P.; Barbey, N.

    2012-12-01

    PyOperators is a publicly available library that provides basic operators and solvers for small-to-very large inverse problems ({http://pchanial.github.com/pyoperators}). It forms the backbone of the package PySimulators, which implements specific operators to construct an instrument model and means to conveniently represent a map, a timeline or a time-dependent observation ({http://pchanial.github.com/pysimulators}). Both are part of the Tamasis (Tools for Advanced Map-making, Analysis and SImulations of Submillimeter surveys) toolbox, aiming at providing versatile, reliable, easy-to-use, and optimal map-making tools for Herschel and future generation of sub-mm instruments. The project is a collaboration between 4 institutes (ESO Garching, IAS Orsay, CEA Saclay, Univ. Leiden).

  17. Reliability and effect of sodium bicarbonate: buffering and 2000-m rowing performance.

    Science.gov (United States)

    Carr, Amelia J; Slater, Gary J; Gore, Christopher J; Dawson, Brian; Burke, Louise M

    2012-06-01

    The aim of this study was to determine the effect and reliability of acute and chronic sodium bicarbonate ingestion for 2000-m rowing ergometer performance (watts) and blood bicarbonate concentration [HCO3-]. In a crossover study, 7 well-trained rowers performed paired 2000-m rowing ergometer trials under 3 double-blinded conditions: (1) 0.3 grams per kilogram of body mass (g/kg BM) acute bicarbonate; (2) 0.5 g/kg BM daily chronic bicarbonate for 3 d; and (3) calcium carbonate placebo, in semi-counterbalanced order. For 2000-m performance and [HCO3-], we examined differences in effects between conditions via pairwise comparisons, with differences interpreted in relation to the likelihood of exceeding smallest worthwhile change thresholds for each variable. We also calculated the within-subject variation (percent typical error). There were only trivial differences in 2000-m performance between placebo (277 ± 60 W), acute bicarbonate (280 ± 65 W) and chronic bicarbonate (282 ± 65 W); however, [HCO3-] was substantially greater after acute bicarbonate, than with chronic loading and placebo. Typical error for 2000-m mean power was 2.1% (90% confidence interval 1.4 to 4.0%) for acute bicarbonate, 3.6% (2.5 to 7.0%) for chronic bicarbonate, and 1.6% (1.1 to 3.0%) for placebo. Postsupplementation [HCO3-] typical error was 7.3% (5.0 to 14.5%) for acute bicarbonate, 2.9% (2.0 to 5.7%) for chronic bicarbonate and 6.0% (1.4 to 11.9%) for placebo. Performance in 2000-m rowing ergometer trials may not substantially improve after acute or chronic bicarbonate loading. However, performances will be reliable with both acute and chronic bicarbonate loading protocols.

  18. Design-for-variety, postponement, and operational performance

    DEFF Research Database (Denmark)

    Boer, Henrike Engele Elisabeth

    2015-01-01

    Design for variety (DFV) practices such as product modularization, platform thinking and design for manufacturing/assembly have been suggested to yield considerable operational performance benefits. Some of these performance effects can be expected in all manufacturing settings, including the pos...

  19. C++ and operating systems performance - A case study

    Science.gov (United States)

    Russo, Vincent F.; Madany, Peter W.; Campbell, Roy H.

    1990-01-01

    Object-oriented design and programming has many software engineering advantages. Its application to large systems, however, has previously been constrained by performance concerns. The Choices operating system, which has over 75,000 lines of code, is object-oriented and programmed in C++. This paper is a case study of the performance of Choices.

  20. Proposed evaluation framework for assessing operator performance with multisensor displays

    Science.gov (United States)

    Foyle, David C.

    1992-01-01

    Despite aggressive work on the development of sensor fusion algorithms and techniques, no formal evaluation procedures have been proposed. Based on existing integration models in the literature, an evaluation framework is developed to assess an operator's ability to use multisensor, or sensor fusion, displays. The proposed evaluation framework for evaluating the operator's ability to use such systems is a normative approach: The operator's performance with the sensor fusion display can be compared to the models' predictions based on the operator's performance when viewing the original sensor displays prior to fusion. This allows for the determination as to when a sensor fusion system leads to: 1) poorer performance than one of the original sensor displays (clearly an undesirable system in which the fused sensor system causes some distortion or interference); 2) better performance than with either single sensor system alone, but at a sub-optimal (compared to the model predictions) level; 3) optimal performance (compared to model predictions); or, 4) super-optimal performance, which may occur if the operator were able to use some highly diagnostic 'emergent features' in the sensor fusion display, which were unavailable in the original sensor displays. An experiment demonstrating the usefulness of the proposed evaluation framework is discussed.