WorldWideScience

Sample records for reliable electric service

  1. Novel approach for evaluation of service reliability for electricity customers

    Institute of Scientific and Technical Information of China (English)

    JIANG; John; N

    2009-01-01

    Understanding reliability value for electricity customer is important to market-based reliability management. This paper proposes a novel approach to evaluate the reliability for electricity customers by using indifference curve between economic compensation for power interruption and service reliability of electricity. Indifference curve is formed by calculating different planning schemes of network expansion for different reliability requirements of customers, which reveals the information about economic values for different reliability levels for electricity customers, so that the reliability based on market supply demand mechanism can be established and economic signals can be provided for reliability management and enhancement.

  2. Estimated Value of Service Reliability for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, M.J.; Mercurio, Matthew; Schellenberg, Josh

    2009-06-01

    Information on the value of reliable electricity service can be used to assess the economic efficiency of investments in generation, transmission and distribution systems, to strategically target investments to customer segments that receive the most benefit from system improvements, and to numerically quantify the risk associated with different operating, planning and investment strategies. This paper summarizes research designed to provide estimates of the value of service reliability for electricity customers in the US. These estimates were obtained by analyzing the results from 28 customer value of service reliability studies conducted by 10 major US electric utilities over the 16 year period from 1989 to 2005. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods it was possible to integrate their results into a single meta-database describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the US for industrial, commercial, and residential customers. Estimated interruption costs for different types of customers and of different duration are provided. Finally, additional research and development designed to expand the usefulness of this powerful database and analysis are suggested.

  3. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Science.gov (United States)

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  4. Hawaii Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Silva Monroy, Cesar Augusto [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  5. Hawaii electric system reliability.

    Energy Technology Data Exchange (ETDEWEB)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  6. Load As A Reliability Resource in the Restructured Electricity Market

    Energy Technology Data Exchange (ETDEWEB)

    Kueck, J.D.

    2002-06-10

    Recent electricity price spikes are painful reminders of the value that meaningful demand-side responses could bring to the restructuring US electricity system. Review of the aggregate offers made by suppliers confirms that even a modest increase in demand elasticity could dramatically reduce these extremes in price volatility. There is a strong need for dramatically increased customer participation in these markets to enhance system reliability and reduce price volatility. Indeed, allowing customers to manage their loads in response to system conditions might be thought of as the ultimate reliability resource. Most would agree that meaningful demand-side responses to price are the hallmark of a well-functioning competitive market [1]. Yet, in today's markets for electricity, little or no such response is evident. The reason is simple: customers currently do not experience directly the time-varying costs of their consumption decisions. Consequently, they have no incentive to modify these decisions in ways that might enhance system reliability or improve the efficiency of the markets in which electricity is traded. Increased customer participation is a necessary step in the evolution toward more efficient markets for electricity and ancillary services. This scoping report provides a three-part assessment of the current status of efforts to enhance the ability of customer's load to participate in competitive markets with a specific focus on the role of customer loads in enhancing electricity system reliability. First, this report considers the definitions of electricity-reliability-enhancing ancillary services (Section 2) and a preliminary assessment of the ability of customer's loads to provide these services. Second, is a review a variety of programs in which load has been called on as a system reliability resource (Section 3). These experiences, drawn from both past and current utility and ISO programs, focus on programs triggered by system

  7. Cyber security for greater service reliability

    Energy Technology Data Exchange (ETDEWEB)

    Vickery, P. [N-Dimension Solutions Inc., Richmond Hill, ON (Canada)

    2008-05-15

    Service reliability in the electricity transmission and distribution (T and D) industry is being challenged by increased equipment failures, harsher climatic conditions, and computer hackers who aim to disrupt services by gaining access to transmission and distribution resources. This article discussed methods of ensuring the cyber-security of T and D operators. Weak points in the T and D industry include remote terminal units; intelligent electronic devices; distributed control systems; programmable logic controllers; and various intelligent field devices. An increasing number of interconnection points exist between an operator's service control system and external systems. The North American Electric Reliability Council (NERC) standards specify that cyber security strategies should ensure that all cyber assets are protected, and that access points must be monitored to detect intrusion attempts. The introduction of new advanced metering initiatives must also be considered. Comprehensive monitoring systems should be available to support compliance with cyber security standards. It was concluded that senior management should commit to a periodic cyber security re-assessment program in order to keep up-to-date.

  8. Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Michael [Nexant Inc., Burlington, MA (United States); Schellenberg, Josh [Nexant Inc., Burlington, MA (United States); Blundell, Marshall [Nexant Inc., Burlington, MA (United States)

    2015-01-01

    This report updates the 2009 meta-analysis that provides estimates of the value of service reliability for electricity customers in the United States (U.S.). The meta-dataset now includes 34 different datasets from surveys fielded by 10 different utility companies between 1989 and 2012. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods, it was possible to integrate their results into a single meta-dataset describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the U.S. for industrial, commercial, and residential customers. This report focuses on the backwards stepwise selection process that was used to develop the final revised model for all customer classes. Across customer classes, the revised customer interruption cost model has improved significantly because it incorporates more data and does not include the many extraneous variables that were in the original specification from the 2009 meta-analysis. The backwards stepwise selection process led to a more parsimonious model that only included key variables, while still achieving comparable out-of-sample predictive performance. In turn, users of interruption cost estimation tools such as the Interruption Cost Estimate (ICE) Calculator will have less customer characteristics information to provide and the associated inputs page will be far less cumbersome. The upcoming new version of the ICE Calculator is anticipated to be released in 2015.

  9. 78 FR 41339 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-07-10

    ...] Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards AGENCY: Federal... Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. FOR FURTHER INFORMATION CONTACT: Kevin Ryan (Legal Information...

  10. Electric markets and services of the system

    International Nuclear Information System (INIS)

    Carbajo, A.

    2007-01-01

    Electricity cannot be stored in significant quantities and requires generation and demand be balanced instantly in order to control the frequency. This means that the electric system must be equipped with specific devices in order to ensure this dynamic balance. Of the services required by the electric system, some are mandatory for the generators, while others are voluntary, these last ones being those supplied under market schemes. On the other hand, the commitment of the Spanish electric system to incorporate a significant volume of renewable energy, due to its intermittent properties, demands that these adjustment services use a greater volume of this energy in order to ensure the reliability of the system at all times. Finally, securing the Iberian electric market implies that there might be variations in these services - not only in the volume but also in their characteristics. (Author)

  11. Unbundling generation and transmission services for competitive electricity markets

    International Nuclear Information System (INIS)

    Hirst, E.; Kirby, B.

    1998-01-01

    Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) defined such services as those 'necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.' The nationwide cost of ancillary services is about $12 billion a year, roughly 10% of the cost of the energy commodity. More important than the cost, however, is the necessity of these services for bulk-power reliability and for the support of commercial transactions. FERC's landmark Order 888 included a pro forma tariff with provision for six key ancillary services. The Interconnected Operations Services Working Group identified another six services that it felt were essential to the operation of bulk-power systems. Several groups throughput the United States have created or are forming independent system operators, which will be responsible for reliability and commerce. To date, the electricity industry (including traditional vertically integrated utilities, distribution utilities, power markets and brokers, customers, and state and federal regulators) has paid insufficient attention to these services. Although the industry had made substantial progress in identifying and defining the key services, much remains to be doe to specify methods to measure the production, delivery, and consumption of these services; to identify the costs and cost-allocation factors for these services; and to develop market and operating rules for their provision and pricing. Developing metrics, determining costs, and setting pricing rules are important because most of these ancillary services are produced by the same pieces of equipment that

  12. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  13. Cross-Subsidies and Government Transfers: Impacts on Electricity Service Quality in Colombia

    Directory of Open Access Journals (Sweden)

    Fan Li

    2018-05-01

    Full Text Available An affordable and reliable supply of electricity service is essential to encourage sustainable social development in developing countries. Colombia uses cross-subsidies to prompt electricity usage for poor households. This raises the issue of whether charging lower prices to poor households, while boosting their consumption, induces utilities to lower the quality of service received by them. This paper uses unique databases and examines how underfunded cross-subsidies affect perceived electricity service quality across consumer groups. Results indicate that when facing financial deficits, utilities provide lower perceived service quality to subsidized consumers than to residents paying surcharges. The difference in perceived quality across consumer groups is reduced by an increase in the amount of (external government transfers. To prompt electricity consumption by the poor, the Colombian government should fund subsidies, strengthen quality regulation, and increase the transparency and reliability of government transfers.

  14. 76 FR 16263 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2011-03-23

    ...; Order No. 743-A] Revision to Electric Reliability Organization Definition of Bulk Electric System AGENCY... certain provisions of the Final Rule. Order No. 743 directed the Electric Reliability Organization (ERO) to revise the definition of the term ``bulk electric system'' through the ERO's Reliability Standards...

  15. 75 FR 72909 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2010-11-26

    ... Bulk-Power System. See Rules Concerning Certification of the Electric Reliability Organization; and... Bulk-Power System in North America because it protects the reliability of the bulk electric system and... Electric Reliability Organization Definition of Bulk Electric System; Final Rule #0;#0;Federal Register...

  16. Applying reliability analysis to design electric power systems for More-electric aircraft

    Science.gov (United States)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  17. The integrated North American electricity market : a bi-national model for securing a reliable supply of electricity

    International Nuclear Information System (INIS)

    Egan, T.

    2004-03-01

    The 50 million people who experienced the power blackout on August 14, 2003 in southern Ontario and the U.S. Midwest and Northeast understood how vital electricity is in our day-to-day lives, but they also saw the resiliency of the North American electricity system. More than 65 per cent of the power generation was restored to service within 12 hours and no damage was caused to the generation or transmission facilities. Although the interconnected North American electricity system is among the most reliable in the world, it is threatened by an aging infrastructure, lack of new generation and transmission to meet demand, and growing regulatory pressures. This report suggests that any measures that respond to the threat of ongoing reliability should be bi-national in scope due to the interconnected nature of the system. Currently, the market, regulatory and administrative systems are different in each country. The full engagement and cooperation of both Canada and the United States is important to ensure future cross-border trade and power reliability. The Canadian Electricity Association proposes the following 7 measures: (1) support an open debate on all the supply options available to meet growing power demands, (2) promote bi-national cooperation in the construction of new transmission capacity to ensure a reliable continental electricity system, (3) examine opportunities for bi-national cooperation for investment in advanced transmission technologies and transmission research and development, (4) promote new generation technology and demand-side measures to relieve existing transmission constraints and reduce the need for new transmission facilities, (5) endorse a self-governing international organization for developing and enforcing mandatory reliability standards for the electricity industry, (6) coordinate measures to promote critical infrastructure protection, and (7) harmonize U.S. and Canadian efforts to streamline or clarify regulation of electricity

  18. Alberta's electricity policy framework : competitive, reliable, sustainable

    International Nuclear Information System (INIS)

    2005-01-01

    This paper described public policies in Alberta that are implemented to create an electric power industry that is competitive, reliable and sustainable. The success of Alberta's competitive electric market framework can be attributed to new investment in the industry along with new players participating in the electricity market. The Alberta Department of Energy is committed to a competitive wholesale market model and to competitively-priced electricity. The Alberta Energy and Utilities Board supports the development of Alberta's vast resource base and facilitates power generation development and support through transmission development and an interconnected transmission system. A wholesale market Policy Task Force was established in 2005 to review the progress in Alberta's electric market design and its competitive retail market. This paper outlines a policy framework which addresses design of the regulated rate option post July 1, 2006; short-term adequacy; and long-term adequacy. Other inter-related market issues were also discussed, such as operating reserves market, transmission services, interties, demand response, balancing pool assets, credit, market power mitigation, and wind generation. It is expected that the recommendations in this paper will be implemented as quickly as possible following amendments to regulations or ISO rules. tabs., figs.

  19. The value of service reliability

    OpenAIRE

    Benezech , Vincent; Coulombel , Nicolas

    2013-01-01

    International audience; This paper studies the impact of service frequency and reliability on the choice of departure time and the travel cost of transit users. When the user has (α, β, γ) scheduling preferences, we show that the optimal head start decreases with service reliability, as expected. It does not necessarily decrease with service frequency, however. We derive the value of service headway (VoSH) and the value of service reliability (VoSR), which measure the marginal effect on the e...

  20. 18 CFR 39.3 - Electric Reliability Organization certification.

    Science.gov (United States)

    2010-04-01

    ... operators of the Bulk-Power System, and other interested parties for improvement of the Electric Reliability... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Reliability..., Reliability Standards that provide for an adequate level of reliability of the Bulk-Power System, and (2) Has...

  1. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  2. INCREASED RELIABILITY OF ELECTRIC BLASTING

    OpenAIRE

    Kashuba, Oleh Ivanovych; Skliarov, L I; Skliarov, A L

    2017-01-01

    The problems of improving reliability of an electric blasting method using electric detonators with nichrome filament bridges. It was revealed that in the calculation of the total resistance of the explosive network it is necessary to increase to 24% of the nominal value

  3. 76 FR 23171 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2011-04-26

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g...-Power System reliability may request an interpretation of a Reliability Standard.\\7\\ The ERO's standards... information in its reliability assessments. The Reliability Coordinator must monitor Bulk Electric System...

  4. 77 FR 39858 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2012-07-05

    ... bulk electric system reliability through steady state power flow, and contain a transient stability... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... definition of ``bulk electric system'' developed by the North American Electric Reliability Corporation (NERC...

  5. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Science.gov (United States)

    2010-04-01

    ... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.4 Funding of the Electric Reliability Organization. (a) Any... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  6. Basic Principles of Electrical Network Reliability Optimization in Liberalised Electricity Market

    Science.gov (United States)

    Oleinikova, I.; Krishans, Z.; Mutule, A.

    2008-01-01

    The authors propose to select long-term solutions to the reliability problems of electrical networks in the stage of development planning. The guide lines or basic principles of such optimization are: 1) its dynamical nature; 2) development sustainability; 3) integrated solution of the problems of network development and electricity supply reliability; 4) consideration of information uncertainty; 5) concurrent consideration of the network and generation development problems; 6) application of specialized information technologies; 7) definition of requirements for independent electricity producers. In the article, the major aspects of liberalized electricity market, its functions and tasks are reviewed, with emphasis placed on the optimization of electrical network development as a significant component of sustainable management of power systems.

  7. Reliability risks during the transition to competitive electricity markets

    International Nuclear Information System (INIS)

    Hughes, J.P.

    2005-01-01

    The Electricity Consumers Resource Council (ELCON) is a U.S. association representing industrial consumers of electricity, and is a long-standing advocate of competition in the electric power industry. However, because a reliable grid is necessary to support competitive wholesale markets, ELCON believes that the transmission system is an essential facility that must remain regulated. The initiatives discussed in this white paper represent significant steps that the National Electric Reliability Council (NERC) and the industry have taken to improve reliability in a competitive and restructured electric industry. Strategic manoeuvres of incumbent utilities to maintain market share were evaluated, as well as discrimination against potential competitors. It was suggested that, occasionally, indecisive federal policies have been taken advantage of by utilities. The unintended consequences of state restructuring policies that allow utilities to over-earn their revenue requirements were reviewed. NERC reliability standards will remain unenforceable until a new Electricity Reliability Organization has been certified. Flawed market designs and inadequate market power mitigation, as well as the financial distress of merchant generators, pose considerable risks. It was suggested that these risks could trigger transmission loading relief incidents, local outages or widespread outages. In the absence of mandatory reliability standards with penalties, and complementary market rules for mitigating generation and transmission market power, economic incentives will encourage other forms of opportunistic behavior that may be the root cause of other outages. Public concern regarding these risks to grid reliability may result in lost public support for competitive electricity markets. Proposed solutions include the certification of a new Electric Reliability Organization to establish and enforce mandatory reliability standards, and granting the Federal Energy Regulatory Commission

  8. 76 FR 66055 - North American Electric Reliability Corporation; Order Approving Interpretation of Reliability...

    Science.gov (United States)

    2011-10-25

    ...\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242... materially affected'' by Bulk-Power System reliability may request an interpretation of a Reliability... Electric Reliability Corporation; Order Approving Interpretation of Reliability Standard; Before...

  9. Distribution-level electricity reliability: Temporal trends using statistical analysis

    International Nuclear Information System (INIS)

    Eto, Joseph H.; LaCommare, Kristina H.; Larsen, Peter; Todd, Annika; Fisher, Emily

    2012-01-01

    This paper helps to address the lack of comprehensive, national-scale information on the reliability of the U.S. electric power system by assessing trends in U.S. electricity reliability based on the information reported by the electric utilities on power interruptions experienced by their customers. The research analyzes up to 10 years of electricity reliability information collected from 155 U.S. electric utilities, which together account for roughly 50% of total U.S. electricity sales. We find that reported annual average duration and annual average frequency of power interruptions have been increasing over time at a rate of approximately 2% annually. We find that, independent of this trend, installation or upgrade of an automated outage management system is correlated with an increase in the reported annual average duration of power interruptions. We also find that reliance on IEEE Standard 1366-2003 is correlated with higher reported reliability compared to reported reliability not using the IEEE standard. However, we caution that we cannot attribute reliance on the IEEE standard as having caused or led to higher reported reliability because we could not separate the effect of reliance on the IEEE standard from other utility-specific factors that may be correlated with reliance on the IEEE standard. - Highlights: ► We assess trends in electricity reliability based on the information reported by the electric utilities. ► We use rigorous statistical techniques to account for utility-specific differences. ► We find modest declines in reliability analyzing interruption duration and frequency experienced by utility customers. ► Installation or upgrade of an OMS is correlated to an increase in reported duration of power interruptions. ► We find reliance in IEEE Standard 1366 is correlated with higher reported reliability.

  10. Electrical system design and reliability at Ontario Hydro nuclear generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Royce, C. J. [Ontario Hydro, 700 University Avenue, Toronto, Ontario M5G 1X6 (Canada)

    1986-02-15

    This paper provides an overview of design practice and the predicted and actual reliability of electrical station service Systems at Ontario Nuclear Generating Stations. Operational experience and licensing changes have indicated the desirability of improving reliability in certain instances. For example, the requirement to start large emergency coolant injection pumps resulted in the turbine generator units in a multi-unit station being used as a back-up power supply. Results of reliability analyses are discussed. To mitigate the effects of common mode events Ontario Hydro adopted a 'two group' approach to the design of safety related Systems. This 'two group' approach is reviewed and a single fully environmentally qualified standby power supply is proposed for future use. (author)

  11. 78 FR 29209 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-05-17

    ... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... local distribution'' as set forth in the Federal Power Act (FPA). \\1\\ Revisions to Electric Reliability... Reliability Organization Definition of Bulk Electric System, Order No. 743, 133 FERC ] 61,150, at P 16 (2010...

  12. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  13. 75 FR 14097 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2010-03-24

    ... electrical failure of a 138 kV motor operated switch on a 138 kV-13 kV transformer located in the ReliabilityFirst region resulted in the tripping of two transformers, one due to the electrical failure and the... Commission 18 CFR Part 40 [Docket No. RM09-18-000; 130 FERC ] 61,204] Revision to Electric Reliability...

  14. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    Directory of Open Access Journals (Sweden)

    Mark Ndubuka NWOHU

    2007-09-01

    Full Text Available The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. This paper presents an economic framework that can be used to optimize electric power system reliability. Finally the cost models are investigated to take into account the economic analysis of system reliability, which can be periodically updated to improve overall reliability of electric power system.

  15. Research on the Reliability Testing of Electrical Automation Control Equipment

    OpenAIRE

    Yongjie Luo

    2014-01-01

    According to the author’s many years’ work experience, this paper first discusses the concepts of electrical automation control equipment reliability testing, and then analyzes the test method of electrical automation control equipment reliability testing, finally, on this basis, this article discusses how to determine the reliability test method of electrical automation control equipment. Results of this study will provide a useful reference for electrical automation control equipment reliab...

  16. NEDO report (April, 1995). Restructuring California's electric services industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Recognizing nationwide changes in the electric utilities industry, Congress enacted the Energy Policy Act of 1992 (EPAct). The purpose is to foster competition and a basis on market mechanisms as the preferred means to develop and deliver energy services. The California Public Utilities Commission (CPUC) hoped to better understand this change while emphasizing efforts to maintain safe, reliable, and reasonably priced electric service. According to the report in February, 1993, CPUC was considering reform of its regulatory program in view of technological change, competitive pressures and emerging market forces. Further, new electric service providers have entered the industry, intensifying competition and producing the opportunity and pressure for consumer choice. Consequently, CPUC are asking the industry to adopt strategic measures to deal with the regulation such as reduced costs and development of efficient innovative services. Hearings have been repeated for the revision of the law; however, the confusion will continue for the time being. Some kind of revision will be concluded within 1995; however, no deregulation will be implemented for the power industry probably until 1996. (NEDO)

  17. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

  18. 76 FR 66057 - North American Electric Reliability Corporation; Order Approving Regional Reliability Standard

    Science.gov (United States)

    2011-10-25

    ... Reliability Standard that is necessitated by a physical difference in the Bulk-Power System.\\7\\ \\7\\ Order No... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... electric system event analyses and thereby improve system reliability by promoting improved system design...

  19. Demand Response Application forReliability Enhancement in Electricity Market

    OpenAIRE

    Romera Pérez, Javier

    2015-01-01

    The term reliability is related with the adequacy and security during operation of theelectric power system, supplying the electricity demand over time and saving thepossible contingencies because every inhabitant needs to be supplied with electricity intheir day to day. Operating the system in this way entails spending money. The first partof the project is going to be an analysis of the reliability and the economic impact of it.During the last decade, electric utilities and companies had be...

  20. Supercomputing Centers and Electricity Service Providers

    DEFF Research Database (Denmark)

    Patki, Tapasya; Bates, Natalie; Ghatikar, Girish

    2016-01-01

    from a detailed, quantitative survey-based analysis and compare the perspectives of the European grid and SCs to the ones of the United States (US). We then show that contrary to the expectation, SCs in the US are more open toward cooperating and developing demand-management strategies with their ESPs......Supercomputing Centers (SCs) have high and variable power demands, which increase the challenges of the Electricity Service Providers (ESPs) with regards to efficient electricity distribution and reliable grid operation. High penetration of renewable energy generation further exacerbates...... this problem. In order to develop a symbiotic relationship between the SCs and their ESPs and to support effective power management at all levels, it is critical to understand and analyze how the existing relationships were formed and how these are expected to evolve. In this paper, we first present results...

  1. Consortium for Electric Reliability Technology Solutions Grid of the Future White Paper on Review of Recent Reliability Issues and Systems Events

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, John F.; Dagle, Jeffery E.

    1999-12-01

    This report is one of six reports developed under the U.S. Department of Energy (DOE) program in Power System Integration and Reliability (PSIR). The objective of this report is to review, analyze, and evaluate critical reliability issues demonstrated by recent disturbance events in the North America power system. Eleven major disturbances are examined, most occurring in this decade. The strategic challenge is that the pattern of technical need has persisted for a long period of time. For more than a decade, anticipation of market deregulation has been a major disincentive to new investments in system capacity. It has also inspired reduced maintenance of existing assets. A massive infusion of better technology is emerging as the final option to continue reliable electrical services. If an investment in better technology will not be made in a timely manner, then North America should plan its adjustments to a very different level of electrical service. It is apparent that technical operations staff among the utilities can be very effective at marshaling their forces in the immediate aftermath of a system emergency, and that serious disturbances often lead to improved mechanisms for coordinated operation. It is not at all apparent that such efforts can be sustained through voluntary reliability organizations in which utility personnel external to those organizations do most of the technical work. The eastern interconnection shows several situations in which much of the technical support has migrated from the utilities to the Independent System Operator (ISO), and the ISO staffs or shares staff with the regional reliability council. This process may be a natural and very positive consequence of utility restructuring. If so, the process should be expedited in regions where it is less advanced.

  2. NEDO report (April, 1995). Restructuring California's electric services industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Recognizing nationwide changes in the electric utilities industry, Congress enacted the Energy Policy Act of 1992 (EPAct). The purpose is to foster competition and a basis on market mechanisms as the preferred means to develop and deliver energy services. The California Public Utilities Commission (CPUC) hoped to better understand this change while emphasizing efforts to maintain safe, reliable, and reasonably priced electric service. According to the report in February, 1993, CPUC was considering reform of its regulatory program in view of technological change, competitive pressures and emerging market forces. Further, new electric service providers have entered the industry, intensifying competition and producing the opportunity and pressure for consumer choice. Consequently, CPUC are asking the industry to adopt strategic measures to deal with the regulation such as reduced costs and development of efficient innovative services. Hearings have been repeated for the revision of the law; however, the confusion will continue for the time being. Some kind of revision will be concluded within 1995; however, no deregulation will be implemented for the power industry probably until 1996. (NEDO)

  3. Electrical machines diagnosis

    CERN Document Server

    Trigeassou, Jean-Claude

    2013-01-01

    Monitoring and diagnosis of electrical machine faults is a scientific and economic issue which is motivated by objectives for reliability and serviceability in electrical drives.This book provides a survey of the techniques used to detect the faults occurring in electrical drives: electrical, thermal and mechanical faults of the electrical machine, faults of the static converter and faults of the energy storage unit.Diagnosis of faults occurring in electrical drives is an essential part of a global monitoring system used to improve reliability and serviceability. This diagnosis is perf

  4. ASCERTAINMENT OF ELECTRIC-SUPPLY SCHEMES RELIABILITY FOR THE ATOMIC POWER PLANT AUXILIARIES

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinskij

    2015-01-01

    Full Text Available The paper completes ascertainment of electrical-supply scheme reliability for the auxiliaries of a nuclear power plant. Thereat the author considers the system behavior during the block normal operation, carrying out current maintenance, and capital repairs in combination with initiating events. The initiating events for reactors include complete blackout, i.e. the loss of outside power supply (normal and reserve; emergency switching one of the working turbogenerators; momentary dumping the normal rating to the level of auxiliaries with seating the cutout valve of one turbo-generator. The combination of any initiating event with the repairing mode in case of one of the system elements failure should not lead to blackout occurrence of more than one system of the reliable power supply. This requirement rests content with the help of the reliable power supply system self-dependence (electrical and functional and the emergency power-supply operational autonomy (diesel generator and accumulator batteries.The reliability indicators of the power supply system for the nuclear power plant auxiliaries are the conditional probabilities of conjoined blackout of one, two, and three sections of the reliable power supply conditional upon an initiating event emerging and the blackout of one, two, and three reliable power-supply sections under the normal operational mode. Furthermore, they also are the blackout periodicity of one and conjointly two, three, and four sections of normal operation under the block normal operational mode. It is established that the blackout of one bus section of normal operation and one section of reliable power-supply system of the auxiliaries that does not lead to complete blackout of the plant auxiliaries may occur once in three years. The probability of simultaneous power failure of two or three normal-operation sections and of two reliable power-supply sections during the power plant service life is unlikely.

  5. Will British weather provide reliable electricity?

    International Nuclear Information System (INIS)

    Oswald, James; Raine, Mike; Ashraf-Ball, Hezlin

    2008-01-01

    There has been much academic debate on the ability of wind to provide a reliable electricity supply. The model presented here calculates the hourly power delivery of 25 GW of wind turbines distributed across Britain's grid, and assesses power delivery volatility and the implications for individual generators on the system. Met Office hourly wind speed data are used to determine power output and are calibrated using Ofgem's published wind output records. There are two main results. First, the model suggests that power swings of 70% within 12 h are to be expected in winter, and will require individual generators to go on or off line frequently, thereby reducing the utilisation and reliability of large centralised plants. These reductions will lead to increases in the cost of electricity and reductions in potential carbon savings. Secondly, it is shown that electricity demand in Britain can reach its annual peak with a simultaneous demise of wind power in Britain and neighbouring countries to very low levels. This significantly undermines the case for connecting the UK transmission grid to neighbouring grids. Recommendations are made for improving 'cost of wind' calculations. The authors are grateful for the sponsorship provided by The Renewable Energy Foundation

  6. Bulk electric system reliability evaluation incorporating wind power and demand side management

    Science.gov (United States)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed

  7. Reliability Assessment of Wind Farm Electrical System Based on a Probability Transfer Technique

    Directory of Open Access Journals (Sweden)

    Hejun Yang

    2018-03-01

    Full Text Available The electrical system of a wind farm has a significant influence on the wind farm reliability and electrical energy yield. The disconnect switch installed in an electrical system cannot only improve the operating flexibility, but also enhance the reliability for a wind farm. Therefore, this paper develops a probabilistic transfer technique for integrating the electrical topology structure, the isolation operation of disconnect switch, and stochastic failure of electrical equipment into the reliability assessment of wind farm electrical system. Firstly, as the traditional two-state reliability model of electrical equipment cannot consider the isolation operation, so the paper develops a three-state reliability model to replace the two-state model for incorporating the isolation operation. In addition, a proportion apportion technique is presented to evaluate the state probability. Secondly, this paper develops a probabilistic transfer technique based on the thoughts that through transfer the unreliability of electrical system to the energy transmission interruption of wind turbine generators (WTGs. Finally, some novel indices for describing the reliability of wind farm electrical system are designed, and the variance coefficient of the designed indices is used as a convergence criterion to determine the termination of the assessment process. The proposed technique is applied to the reliability assessment of a wind farm with the different topologies. The simulation results show that the proposed techniques are effective in practical applications.

  8. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  9. Choice experiment study on the willingness to pay to improve electricity services

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Sabah [Department of Economics, Claverton Down, University of Bath, Bath BA2 7AY (United Kingdom); Department of Economic Analysis and Institute of Public Economics, University of the Basque Country Avda. Lehendakari Aguirre 81, 48015 Bilbao (Spain); Mariel, Petr [Department of Applied Economics III (Econometrics and Statistics), University of the Basque Country Avda. Lehendakari Aguirre 83, E48015 Bilbao (Spain)

    2010-08-15

    Modern forms of energy are an important vehicle towards poverty alleviation in rural areas of developing countries. Most developing countries' households rely heavily on wood fuel which impacts on their health and socio-economic status. To ease such a dependency, other modern forms of energy, namely electricity, need to be provided. However, the quality of the electricity service, namely reliability, is an important factor in reducing this dependency. This paper discusses a choice experiment valuation study conducted among electrified rural households located in Kisumu, Kenya, in which the willingness to pay (WTP) to avoid power outages or blackouts was estimated. A mixed logit estimation was applied to identify the various socio-economic and demographic characteristics which determine preferences in reducing power outages among a household's users. In conclusion, several of the socio-economic and demographic characteristics outlined in this paper were identified and can assist service differentiation to accommodate the diverse households' preferences towards the improvement of the electricity service. (author)

  10. Choice experiment study on the willingness to pay to improve electricity services

    International Nuclear Information System (INIS)

    Abdullah, Sabah; Mariel, Petr

    2010-01-01

    Modern forms of energy are an important vehicle towards poverty alleviation in rural areas of developing countries. Most developing countries' households rely heavily on wood fuel which impacts on their health and socio-economic status. To ease such a dependency, other modern forms of energy, namely electricity, need to be provided. However, the quality of the electricity service, namely reliability, is an important factor in reducing this dependency. This paper discusses a choice experiment valuation study conducted among electrified rural households located in Kisumu, Kenya, in which the willingness to pay (WTP) to avoid power outages or blackouts was estimated. A mixed logit estimation was applied to identify the various socio-economic and demographic characteristics which determine preferences in reducing power outages among a household's users. In conclusion, several of the socio-economic and demographic characteristics outlined in this paper were identified and can assist service differentiation to accommodate the diverse households' preferences towards the improvement of the electricity service.

  11. Reliability constrained decision model for energy service provider incorporating demand response programs

    International Nuclear Information System (INIS)

    Mahboubi-Moghaddam, Esmaeil; Nayeripour, Majid; Aghaei, Jamshid

    2016-01-01

    Highlights: • The operation of Energy Service Providers (ESPs) in electricity markets is modeled. • Demand response as the cost-effective solution is used for energy service provider. • The market price uncertainty is modeled using the robust optimization technique. • The reliability of the distribution network is embedded into the framework. • The simulation results demonstrate the benefits of robust framework for ESPs. - Abstract: Demand response (DR) programs are becoming a critical concept for the efficiency of current electric power industries. Therefore, its various capabilities and barriers have to be investigated. In this paper, an effective decision model is presented for the strategic behavior of energy service providers (ESPs) to demonstrate how to participate in the day-ahead electricity market and how to allocate demand in the smart distribution network. Since market price affects DR and vice versa, a new two-step sequential framework is proposed, in which unit commitment problem (UC) is solved to forecast the expected locational marginal prices (LMPs), and successively DR program is applied to optimize the total cost of providing energy for the distribution network customers. This total cost includes the cost of purchased power from the market and distributed generation (DG) units, incentive cost paid to the customers, and compensation cost of power interruptions. To obtain compensation cost, the reliability evaluation of the distribution network is embedded into the framework using some innovative constraints. Furthermore, to consider the unexpected behaviors of the other market participants, the LMP prices are modeled as the uncertainty parameters using the robust optimization technique, which is more practical compared to the conventional stochastic approach. The simulation results demonstrate the significant benefits of the presented framework for the strategic performance of ESPs.

  12. Electricity supply. Older plants' impact on reliability and air quality

    International Nuclear Information System (INIS)

    England-Joseph, Judy A.; Adams, Charles M.; Wood, David G.; Feehan, Daniel J.; Veal, Howard F.; Skeen, John H. III; Koenigs, Melvin J.; Lichtenfeld, David I.; Seretakis, Pauline J.

    1990-09-01

    Life extension of fossil fuel plants is a relatively recent phenomenon; thus, utilities have little experience to demonstrate the longer-term operating reliability of plants with an extended service life. While utility industry officials and government and industry studies express optimism that these plants will continue to operate reliably, the officials and the studies also caution that it is too soon to determine how pursuing life extension will affect the reliability of the nation's electricity supply. According to DOE, the number of fossil fuel generating units' 30 years old or older is expected to increase from about 2,500 in 1989 to roughly 3,700 in 1998, increasing such plants' share of overall generating capacity from 13 percent in 1989 to 27 percent in 1998. EPA estimates that with existing air quality requirements, fossil fuel plant emissions will increase steadily during the coming decade. Proposed acid rain control legislation, which would affect many plants that may have their service life extended, would require utilities to significantly reduce emissions by the year 2000 but would allow utilities flexibility in deciding how and where to achieve the reductions. If such legislation is enacted, utilities generally are expected to find reducing emissions from existing plants more cost-effective than replacing them and to continue extending plants' service life. Officials of DOE and utility organizations expressed concern, however, that EPA could decide, as it did for one plant in 1988, that alterations made in extending the service life of plants exempted from the Clean Air Act would result in increased emissions and thus cause the altered plants to lose their exemption. According to the officials, the additional costs of achieving the Clean Air Act's standards could discourage some life extension projects. However, such decisions by EPA could also reduce the nation's total power plant emissions by eliminating an existing incentive to retain exempt

  13. Demonstration of Essential Reliability Services by a 300-MW Solar Photovoltaic Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Loutan, Clyde; Klauer, Peter; Chowdhury, Sirajul; Hall, Stephen; Morjaria, Mahesh; Chadliev, Vladimir; Milam, Nick; Milan, Christopher; Gevorgian, Vahan

    2017-03-24

    The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integration of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be

  14. 18 CFR 375.303 - Delegations to the Director of the Office of Electric Reliability.

    Science.gov (United States)

    2010-04-01

    ... Director of the Office of Electric Reliability. 375.303 Section 375.303 Conservation of Power and Water... Delegations § 375.303 Delegations to the Director of the Office of Electric Reliability. The Commission... Electric Reliability Organization or Regional Entity rules or procedures; (ii) Reject an application...

  15. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    OpenAIRE

    Chassin, David P.; Posse, Christian

    2004-01-01

    The reliability of electric transmission systems is examined using a scale-free model of network structure and failure propagation. The topologies of the North American eastern and western electric networks are analyzed to estimate their reliability based on the Barabasi-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using s...

  16. A COMPUTERIZED DIAGNOSTIC COMPLEX FOR RELIABILITY TESTING OF ELECTRIC MACHINES

    Directory of Open Access Journals (Sweden)

    O.О. Somka

    2015-06-01

    Full Text Available Purpose. To develop a diagnostic complex meeting the criteria and requirements for carrying out accelerated reliability test and realizing the basic modes of electric machines operation and performance of the posed problems necessary in the process of such test. Methodology. To determine and forecast the indices of electric machines reliability in accordance with the statistic data of repair plants we have conditionally divided them into structural parts that are most likely to fail. We have preliminarily assessed the state of each of these parts, which includes revelation of faults and deviations of technical and geometric parameters. We have determined the analyzed electric machine controlled parameters used for assessment of quantitative characteristics of reliability of these parts and electric machines on the whole. Results. As a result of the research, we have substantiated the structure of a computerized complex for electric machines reliability test. It allows us to change thermal and vibration actions without violation of the physics of the processes of aging and wearing of the basic structural parts and elements material. The above mentioned makes it possible to considerably reduce time spent on carrying out electric machines reliability tests and improve trustworthiness of the data obtained as a result of their performance. Originality. A special feature of determination of the controlled parameters consists in removal of vibration components in the idle mode and after disconnection of the analyzed electric machine from the power supply with the aim of singling out the vibration electromagnetic component, fixing the degree of sparking and bend of the shaft by means of phototechnique and local determination of structural parts temperature provided by corresponding location of thermal sensors. Practical value. We have offered a scheme of location of thermal and vibration sensors, which allows improvement of parameters measuring accuracy

  17. Reliability payments to generation capacity in electricity markets

    International Nuclear Information System (INIS)

    Olsina, Fernando; Pringles, Rolando; Larisson, Carlos; Garcés, Francisco

    2014-01-01

    Electric power is a critical input to modern economies. Generation adequacy and security of supply in power systems running under competition are currently topics of high concern for consumers, regulators and governments. In a market setting, generation investments and adequacy can only be achieved by an appropriate regulatory framework that sets efficient remuneration to power capacity. Theoretically, energy-only electricity markets are efficient and no additional mechanism is needed. Nonetheless, the energy-only market design suffers from serious drawbacks. Therefore, jointly with the evolution of electricity markets, many remunerating mechanisms for generation capacity have been proposed. Explicit capacity payment was the first remunerating approach implemented and perhaps still the most applied. However, this price-based regulation has been applied no without severe difficulties and criticism. In this paper, a new reliability payment mechanism is envisioned. Capacity of each generating unit is paid according to its effective contribution to overall system reliability. The proposed scheme has many attractive features and preserves the theoretical efficiency properties of energy-only markets. Fairness, incentive compatibility, market power mitigation and settlement rules are investigated in this work. The article also examines the requirements for system data and models in order to implement the proposed capacity mechanism. A numerical example on a real hydrothermal system serves for illustrating the practicability of the proposed approach and the resulting reliability payments to the generation units. - Highlights: • A new approach for remunerating supply reliability provided by generation units is proposed. • The contribution of each generating unit to lessen power shortfalls is determined by simulations. • Efficiency, fairness and incentive compatibility of the proposed reliability payment are assessed

  18. Influence of reliability of the relay protection to the whole reliability of electric power systems

    International Nuclear Information System (INIS)

    Stojanovski, Ljupcho I.

    2001-01-01

    The influence of the reliability of the elements of relay protection up today analyses of the reliability on electric power systems, very rare has been taken into consideration, in other words, in these analyses it is assumed that the reliability of the protection has value one. In this work an attempt is that through modelling of individual types of protection of the elements of high-voltage systems to make calculation to the influence of the reliability of the relay protection on the total reliability of the high-voltage systems.(Author)

  19. Service validity and service reliability of search, experience and credence services. A scenario study

    NARCIS (Netherlands)

    Galetzka, Mirjam; Verhoeven, J.W.M.; Pruyn, Adriaan T.H.

    2006-01-01

    The purpose of this research is to add to our understanding of the antecedents of customer satisfaction by examining the effects of service reliability (Is the service “correctly” produced?) and service validity (Is the “correct” service produced?) of search, experience and credence services.

  20. Demand participation in the restructured Electric Reliability Council of Texas market

    International Nuclear Information System (INIS)

    Zarnikau, Jay W.

    2010-01-01

    Does an electricity market which has been restructured to foster competition provide greater opportunities for demand response than a traditional regulated utility industry? The experiences of the restructured Electric Reliability Council of Texas (ERCOT) market over the past eight years provide some hope that it is possible to design a competitive market which will properly value and accommodate demand response. While the overall level of demand response in ERCOT is below the levels enjoyed prior to restructuring, there have nonetheless been some promising advances, including the integration of demand-side resources into competitive markets for ancillary services. ERCOT's experiences demonstrate that the degree of demand participation in a restructured market is highly sensitive to the market design. But even in a market which has been deregulated to a large degree, regulatory intervention and special demand-side programs may be needed in order to bolster demand response. (author)

  1. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  2. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Science.gov (United States)

    2010-01-01

    ... System (APS)—7, except Duquesne Light Company. 2. American Electric Power System (AEP)—entire AEP System... 10 Energy 4 2010-01-01 2010-01-01 false Electric regions-electric region groupings for reliability... of electric regions for use with regard to the Act. The regions are identified by FERC Power Supply...

  3. FUNDAMENTALS OF RELIABILITY OF ELECTRIC POWER SYSTEM AND EQUIPMENT

    OpenAIRE

    Engr. Anumaka; Michael Chukwukadibia

    2011-01-01

    Today, the electric power system consists of complex interconnected network which are prone to different problems that militates against the reliability of the power system. Inadequate reliability in the power system causes problems such as high failure rate of power system installations and consumer equipment, transient and intransient faults, symmetrical faults etc. This paper provides an extensive review of the powers system and equipment reliability and related failure patterns in equipment.

  4. Reliability Engineering for Service Oriented Architectures

    Science.gov (United States)

    2013-02-01

    Common Object Request Broker Architecture Ecosystem In software , an ecosystem is a set of applications and/or services that grad- ually build up over time...Enterprise Service Bus Foreign In an SOA context: Any SOA, service or software which the owners of the calling software do not have control of, either...SOA Service Oriented Architecture SRE Software Reliability Engineering System Mode Many systems exhibit different modes of operation. E.g. the cockpit

  5. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Science.gov (United States)

    2010-04-01

    ... RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric... Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water...

  6. Data reliability in home healthcare services

    NARCIS (Netherlands)

    Vavilis, S.; Zannone, N.; Petkovic, M.

    2013-01-01

    Home healthcare services are emerging as a new frontier in healthcare practices. Data reliability, however, is crucial for the acceptance of these new services. This work presents a semi-automated system to evaluate the quality of medical measurements taken by patients. The system relies on data

  7. Assessing Changes in the Reliability of the U.S. Electric Power System

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Stanford Univ., CA (United States). Dept. of Physics; LaCommare, Kristina H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sweeney, James L. [Stanford Univ., CA (United States)

    2015-08-01

    Over the past 15 years, the most well-publicized efforts to assess trends in U.S. electric power system reliability have focused only on a subset of all power interruption events (see, for example, Amin 2008 and Campbell 2012)—namely, only the very largest events, which trigger immediate emergency reporting to federal agencies and industry regulators. Anecdotally, these events are thought by many to represent no more than 10% of the power interruptions experienced annually by electricity consumers. Moreover, a review of these emergency reports has identified shortcomings in relying on these data as reliable sources for assessing trends, even with the reliability events they report (Fisher et al. 2012). Recent work has begun to address these limitations by examining trends in reliability data collected annually by electricity distribution companies (Eto et al. 2012). In principle, all power interruptions experienced by electricity customers, regardless of size, are recorded by the distribution utility. Moreover, distribution utilities have a long history of recording this information, often in response to mandates from state public utility commissions (Eto et al. 2006). Thus, studies that rely on reliability data collected by distribution utilities can, in principle, provide a more complete basis upon which to assess trends or changes in reliability over time.

  8. 75 FR 80391 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2010-12-22

    ... transmission (G&T) cooperative or similar organization to accept compliance responsibility on behalf of its... be found on the Commission's Web site; see, e.g., the ``Quick Reference Guide for Paper Submissions... Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g, Order No. 672...

  9. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    OpenAIRE

    Mark Ndubuka NWOHU

    2007-01-01

    The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. ...

  10. Improvement of standards on functional reliability of electric power systems

    International Nuclear Information System (INIS)

    Barinov, V.A.; Volkov, G.A.; Kalita, V.V.; Kogan, F.L.; Makarov, S.F.; Manevich, A.S.; Mogirev, V.V.; Sin'chugov, F.I.; Skopintsev, V.A.; Khvoshchinskaya, Z.G.

    1993-01-01

    Analysis of the most principal aspects of the existing standards and requirements on assuring safety and stability of electric power systems (EPS) and effective (reliable and economical) power supply of consumers is given. The reliability is determined as ability to accomplish the assigned functions. Basic recommendations on improving the standards regulating the safety and reliability of the NPP functioning are formulated

  11. Scoping study on trends in the economic value of electricity reliability to the U.S. economy

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan; Martin, Nathan; Mills, Evan; Webber, Carrie; Worrell, Ernst

    2001-06-01

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability in the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs.

  12. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  13. Product quality, service reliability and management of operations at ...

    African Journals Online (AJOL)

    High product quality, service reliability, and management of operations are key factors in business growth and sustainability. Analyzing “The Starbucks Experience” is a pedagogical approach to reinforcing the concepts of control and management of quality, service reliability, and efficient operations in action. The objective ...

  14. Managing relationships between electric power industry restructuring and grid reliability

    International Nuclear Information System (INIS)

    Thomas, R.J.

    2005-01-01

    The electricity system is a critical infrastructure, and its continued and reliable functioning is essential to the nation's economy and well-being. However, the inter-dependency of electricity networks is not completely understood. The economic impact of outages was discussed in this white paper. It was suggested that moving to a restructured environment has degraded the reliability of the bulk system. New institutional arrangements and approaches to information management are needed. It was suggested that reliability practices caused the 2003 blackout, and not technical failures. Uncertainties in the restructured market were discussed, as well as incentives to maintain system adequacy. Examples of deregulation in other countries were presented. Organizational complexities were reviewed, including the Federal Energy Regulatory Commission's (FERC) requirements and the new layers of complexity that have been added to the decision-making process in the light of restructuring. Planning and connectivity issues were reviewed. The need for design standards in power grid control centres was discussed. Difficulties in collecting data from different control centres were considered. Issues concerning the lack of investment in research and development were discussed, with particular reference to the urgent need for coordinated research programs. The looming manpower crisis in the electric power industry was also discussed. Recommendations included ensuring that the transmission system can support a market structure; building a national reliability centre; solving the manpower crisis; and testing market designs before deploying them. It was concluded that good engineering design principles, including experimental economic testing, should be required of any new electricity market design before authorizing its use. 31 refs., 1 tab., 6 figs

  15. R&D program benefits estimation: DOE Office of Electricity Delivery and Energy Reliability

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-12-04

    The overall mission of the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. In support of this mission, OE conducts a portfolio of research and development (R&D) activities to advance technologies to enhance electric power delivery. Multiple benefits are anticipated to result from the deployment of these technologies, including higher quality and more reliable power, energy savings, and lower cost electricity. In addition, OE engages State and local government decision-makers and the private sector to address issues related to the reliability and security of the grid, including responding to national emergencies that affect energy delivery. The OE R&D activities are comprised of four R&D lines: High Temperature Superconductivity (HTS), Visualization and Controls (V&C), Energy Storage and Power Electronics (ES&PE), and Distributed Systems Integration (DSI).

  16. Effect of Heat and Electricity Storage and Reliability on Microgrid Viability:A Study of Commercial Buildings in California and New York States

    Energy Technology Data Exchange (ETDEWEB)

    Stadler, Michael; Marnay, Chris; Siddiqui, Afzal; Lai, Judy; Coffey, Brian; Aki, Hirohisa

    2008-12-01

    In past work, Berkeley Lab has developed the Distributed Energy Resources Customer Adoption Model (DER-CAM). Given end-use energy details for a facility, a description of its economic environment and a menu of available equipment, DER-CAM finds the optimal investment portfolio and its operating schedule which together minimize the cost of meeting site service, e.g., cooling, heating, requirements. Past studies have considered combined heat and power (CHP) technologies. Methods and software have been developed to solve this problem, finding optimal solutions which take simultaneity into account. This project aims to extend on those prior capabilities in two key dimensions. In this research storage technologies have been added as well as power quality and reliability (PQR) features that provide the ability to value the additional indirect reliability benefit derived from Consortium for Electricity Reliability Technology Solutions (CERTS) Microgrid capability. This project is intended to determine how attractive on-site generation becomes to a medium-sized commercial site if economical storage (both electrical and thermal), CHP opportunities, and PQR benefits are provided in addition to avoiding electricity purchases. On-site electrical storage, generators, and the ability to seamlessly connect and disconnect from utility service would provide the facility with ride-through capability for minor grid disturbances. Three building types in both California and New York are assumed to have a share of their sensitive electrical load separable. Providing enhanced service to this load fraction has an unknown value to the facility, which is estimated analytically. In summary, this project began with 3 major goals: (1) to conduct detailed analysis to find the optimal equipment combination for microgrids at a few promising commercial building hosts in the two favorable markets of California and New York; (2) to extend the analysis capability of DER-CAM to include both heat and

  17. Reliability & availability of wind turbine electrical & electronic components

    NARCIS (Netherlands)

    Tavner, P.; Faulstich, S.; Hahn, B.; Bussel, van G.J.W.

    2010-01-01

    Recent analysis of European onshore wind turbine reliability data has shown that whilst wind turbine mechanical subassemblies tend to have relatively low failure rates but long downtimes, electrical and electronic subassemblies have relatively high failure rates and short downtimes. For onshore wind

  18. Challenges of ITER diagnostic electrical services

    Energy Technology Data Exchange (ETDEWEB)

    Encheva, A., E-mail: anna.encheva@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Omran, H. [Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RL (United Kingdom); Pérez-Lasala, M. [The European Joint Undertaking for ITER and the Development of Fusion Energy, c/Josep Pla, n° 2, Torres Diagonal Litoral, Edificio B3, 08019 Barcelona (Spain); Alekseev, A. [Efremov Institute, Metallostroy, Doroga na Metallostroy, 3 bld., Saint-Petersburg 196641 (Russian Federation); Arshad, S. [The European Joint Undertaking for ITER and the Development of Fusion Energy, c/Josep Pla, n° 2, Torres Diagonal Litoral, Edificio B3, 08019 Barcelona (Spain); Bede, O. [Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RL (United Kingdom); Bender, S. [Efremov Institute, Metallostroy, Doroga na Metallostroy, 3 bld., Saint-Petersburg 196641 (Russian Federation); Bertalot, L.; Direz, M.-F.; Drevon, J.-M.; Jakhar, S.; Kaschuk, Y.; Komarov, V.; Lebarbier, R. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Lucca, F. [L.T. Calcoli SaS, Piazza Prinetti 26/B, 23807 Merate (Italy); Macklin, B.; Maquet, P. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Marin, A. [L.T. Calcoli SaS, Piazza Prinetti 26/B, 23807 Merate (Italy); Martin, A. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Mills, S. [Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RL (United Kingdom); and others

    2013-10-15

    Highlights: • A brief description of all major components part of diagnostic electrical services has been given. • The integration challenges have been presented. • Design assumptions and requirements for the components have been described. • The design of the conduit/loom and the relevant analysis has been highlighted. -- Abstract: Diagnostic electrical services provide the electrical infrastructure to serve diagnostic components installed on the ITER tokamak. This infrastructure is composed of cables, connectors, cable tails, looms, conduits and feedthroughs. The diagnostic services offer as well a shelter for various instrumentations – vacuum vessel (VV), blanket and divertor. The diagnostic sensors are located on the inner and outer VV wall, on blanket shield modules, divertor cassettes and in port plugs. They require electrical cabling to extract the measurement and, in some cases, to supply electrical power to the sensors. These cables run from the sensors to feedthroughs on the VV and the port interspace or cryostat. The design and integration of all components that are part of diagnostic electrical services is an important engineering activity that is being challenged by the multiple requirements and constraints which have to be satisfied while at the same time delivering the required diagnostic performance. The positioning of the components must correlate not only with their functional specifications but also with the design of the major ITER components. This is a particular challenge because not all systems have reached the same level of design maturity. This paper outlines the engineering challenges of ITER diagnostics electrical services. The environmental conditions inside the VV will have an important impact. Leading risks to these components include poor electrical contact at connectors, the effects of exposure to nuclear irradiation, such as material transmutation, heating, and generation of spurious electrical signals etc., failure due to

  19. Scoping study on trends in the economic value of electricity reliability to the U.S. economy; TOPICAL

    International Nuclear Information System (INIS)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan; Martin, Nathan; Mills, Evan; Webber, Carrie; Worrell, Ernst

    2001-01-01

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability in the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs

  20. Reliability of solid-state lighting electrical drivers subjected to WHTOL accelerated aging

    Energy Technology Data Exchange (ETDEWEB)

    Lall, Pradeep; Sakalauku, Peter; Davis, Lynn

    2014-05-27

    An investigation of a solid-state lighting (SSL) luminaire with the focus on the electronic driver which has been exposed to a standard wet hot temperature operating life (WHTOL) of 85% RH and 85°C in order to assess reliability of prolonged exposer to a harsh environment has been conducted. SSL luminaires are beginning introduced as head lamps in some of today's luxury automobiles and may also be fulfilling a variety of important outdoor applications such as overhead street lamps, traffic signals and landscape lighting. SSL luminaires in these environments are almost certain to encounter excessive moisture from humidity and high temperatures for a persistent period of time. The lack of accelerated test methods for LEDs to assess long-term reliability prior to introduction into the marketplace, a need for SSL physics based PHM modeling indicators for assessment and prediction of LED life, as well as the U.S. Department of Energy's R&D roadmap to replace todays lighting with SSL luminaires makes it important to increase the understanding of the reliability of SSL devices, specifically, in harsh environment applications. In this work, a set of SSL electrical drivers were investigated to determine failure mechanisms that occur during prolonged harsh environment applications. Each driver consists of four aluminum electrolytic capacitors (AECs) of three different types and was considered the weakest component inside the SSL electrical driver. The reliability of the electrical driver was assessed by monitoring the change in capacitance and the change in equivalent series resistance for each AEC, as well as monitoring the luminous flux of the SSL luminaire or the output of the electrical driver. The luminous flux of a pristine SSL electrical driver was also monitored in order to detect minute changes in the electrical drivers output and to aid in the investigation of the SSL luminaires reliability. The failure mechanisms of the electrical drivers have been

  1. Perceived benefits of adopting Standard – Based pricing mechanism for mechanical and electrical services installations

    OpenAIRE

    Ganiyu Amuda Yusuf; Sarajul Fikri Mohamed

    2014-01-01

    Cost is an important measure of project success and clients will expect a reliable forecast at the early stage of construction projects to inform their business decision. This study was undertaken to investigate the current practices in managing cost of mechanical and electrical (M&E) services in buildings. The perceptions of practitioners on the benefits of adopting Standard – Based Pricing Mechanism for M&E services as used for building fabrics and finishes was ascertained. The meth...

  2. A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Weller, G.H.

    2001-07-15

    Utility load management programs--including direct load control and interruptible load programs--were employed by utilities in the past as system reliability resources. With electricity industry restructuring, the context for these programs has changed; the market that was once controlled by vertically integrated utilities has become competitive, raising the question: can existing load management programs be modified so that they can effectively participate in competitive energy markets? In the short run, modified and/or improved operation of load management programs may be the most effective form of demand-side response available to the electricity system today. However, in light of recent technological advances in metering, communication, and load control, utility load management programs must be carefully reviewed in order to determine appropriate investments to support this transition. This report investigates the feasibility of and options for modifying an existing utility load management system so that it might provide reliability services (i.e. ancillary services) in the competitive markets that have resulted from electricity industry restructuring. The report is a case study of Southern California Edison's (SCE) load management programs. SCE was chosen because it operates one of the largest load management programs in the country and it operates them within a competitive wholesale electricity market. The report describes a wide range of existing and soon-to-be-available communication, control, and metering technologies that could be used to facilitate the evolution of SCE's load management programs and systems to provision of reliability services. The fundamental finding of this report is that, with modifications, SCE's load management infrastructure could be transitioned to provide critical ancillary services in competitive electricity markets, employing currently or soon-to-be available load control technologies.

  3. Small nuclear power reactor emergency electric power supply system reliability comparative analysis

    International Nuclear Information System (INIS)

    Bonfietti, Gerson

    2003-01-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  4. Architecture-Based Reliability Analysis of Web Services

    Science.gov (United States)

    Rahmani, Cobra Mariam

    2012-01-01

    In a Service Oriented Architecture (SOA), the hierarchical complexity of Web Services (WS) and their interactions with the underlying Application Server (AS) create new challenges in providing a realistic estimate of WS performance and reliability. The current approaches often treat the entire WS environment as a black-box. Thus, the sensitivity…

  5. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  6. Reliability Prediction Approaches For Domestic Intelligent Electric Energy Meter Based on IEC62380

    Science.gov (United States)

    Li, Ning; Tong, Guanghua; Yang, Jincheng; Sun, Guodong; Han, Dongjun; Wang, Guixian

    2018-01-01

    The reliability of intelligent electric energy meter is a crucial issue considering its large calve application and safety of national intelligent grid. This paper developed a procedure of reliability prediction for domestic intelligent electric energy meter according to IEC62380, especially to identify the determination of model parameters combining domestic working conditions. A case study was provided to show the effectiveness and validation.

  7. Using VIIRS Day/Night Band to Measure Electricity Supply Reliability: Preliminary Results from Maharashtra, India

    Directory of Open Access Journals (Sweden)

    Michael L. Mann

    2016-08-01

    Full Text Available Unreliable electricity supplies are common in developing countries and impose large socio-economic costs, yet precise information on electricity reliability is typically unavailable. This paper presents preliminary results from a machine-learning approach for using satellite imagery of nighttime lights to develop estimates of electricity reliability for western India at a finer spatial scale. We use data from the Visible Infrared Imaging Radiometer Suite (VIIRS onboard the Suomi National Polar Partnership (SNPP satellite together with newly-available data from networked household voltage meters. Our results point to the possibilities of this approach as well as areas for refinement. With currently available training data, we find a limited ability to detect individual outages identified by household-level measurements of electricity voltage. This is likely due to the relatively small number of individual outages observed in our preliminary data. However, we find that the approach can estimate electricity reliability rates for individual locations fairly well, with the predicted versus actual regression yielding an R2 > 0.5. We also find that, despite the after midnight overpass time of the SNPP satellite, the reliability estimates derived are representative of daytime reliability.

  8. Rural electric energy services in China: Implementing the renewable energy challenge

    Energy Technology Data Exchange (ETDEWEB)

    Weingart, J.W.

    1996-12-31

    This paper discusses issues related to rural electrification in China, with emphasis on a pilot project in Mongolia to implement small scale renewable energy sources. These projects consist of photovoltaic systems, wind electric systems, photovoltaic/wind hybrid systems, and wind/gasoline generator sets. These systems are small enough to implement in rural environments, more cost effective than grid type systems, and have lower cost than standard generator sets alone because of the improved reliability. The author also discusses the use of such systems for village power sources. A number of factors are contributing to the increase in such systems. Individuals are able and willing to pay for such systems, lending institutions are willing to fund such small-scale projects, they provide reliable, high quality services which support social and economic development.

  9. An assessment of the reliability of the Ontario electricity system : 18-month outlook from April 2004 to September 2005

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents a resource assessment by the Independent Electricity Market Operator (IMO) for the 18-month period from April 2004 to September 2005. It is based on the IMO's forecast of electricity demand. The information was provided by power generators in Ontario. The outlook for the electricity system has improved due to the return to service of 3 nuclear units and the addition of more than 700 MW of generation. The return to service of the nuclear units has decreased Ontario's reliance on imports to help meet energy demand in the province. The shutdown of 1150 MW of coal-fired generation at Lakeview Thermal Generating Station in Mississauga emphasizes the importance of improving transmission and generation capacity in the Toronto area. This report also includes updated values for existing resource scenarios and planned resource scenarios. The reliability of Ontario's transmission system was also assessed along with the adequacy of the existing resource to meet the forecast demand. The existing installed generation resources include 5 nuclear stations generating 10,831 MW of electricity, 5 coal stations generating 7,564 MW of electricity, 22 oil and gas fired stations generating 4,364 MW of electricity, 61 hydroelectric stations generating 7,676 MW of electricity, and 2 other stations generating 66 MW of electricity. Although the existing resource scenario is better than in previous reports, imports will be required under extreme weather conditions to help meet electricity demand in Ontario during peak periods. 21 tabs., 10 figs

  10. RSAM: An enhanced architecture for achieving web services reliability in mobile cloud computing

    Directory of Open Access Journals (Sweden)

    Amr S. Abdelfattah

    2018-04-01

    Full Text Available The evolution of the mobile landscape is coupled with the ubiquitous nature of the internet with its intermittent wireless connectivity and the web services. Achieving the web service reliability results in low communication overhead and retrieving the appropriate response. The middleware approach (MA is highly tended to achieve the web service reliability. This paper proposes a Reliable Service Architecture using Middleware (RSAM that achieves the reliable web services consumption. The enhanced architecture focuses on ensuring and tracking the request execution under the communication limitations and service temporal unavailability. It considers the most measurement factors including: request size, response size, and consuming time. We conducted experiments to compare the enhanced architecture with the traditional one. In these experiments, we covered several cases to prove the achievement of reliability. Results also show that the request size was found to be constant, the response size is identical to the traditional architecture, and the increase in the consuming time was less than 5% of the transaction time with the different response sizes. Keywords: Reliable web service, Middleware architecture, Mobile cloud computing

  11. Health Service Quality Scale: Brazilian Portuguese translation, reliability and validity.

    Science.gov (United States)

    Rocha, Luiz Roberto Martins; Veiga, Daniela Francescato; e Oliveira, Paulo Rocha; Song, Elaine Horibe; Ferreira, Lydia Masako

    2013-01-17

    The Health Service Quality Scale is a multidimensional hierarchical scale that is based on interdisciplinary approach. This instrument was specifically created for measuring health service quality based on marketing and health care concepts. The aim of this study was to translate and culturally adapt the Health Service Quality Scale into Brazilian Portuguese and to assess the validity and reliability of the Brazilian Portuguese version of the instrument. We conducted a cross-sectional, observational study, with public health system patients in a Brazilian university hospital. Validity was assessed using Pearson's correlation coefficient to measure the strength of the association between the Brazilian Portuguese version of the instrument and the SERVQUAL scale. Internal consistency was evaluated using Cronbach's alpha coefficient; the intraclass (ICC) and Pearson's correlation coefficients were used for test-retest reliability. One hundred and sixteen consecutive postoperative patients completed the questionnaire. Pearson's correlation coefficient for validity was 0.20. Cronbach's alpha for the first and second administrations of the final version of the instrument were 0.982 and 0.986, respectively. For test-retest reliability, Pearson's correlation coefficient was 0.89 and ICC was 0.90. The culturally adapted, Brazilian Portuguese version of the Health Service Quality Scale is a valid and reliable instrument to measure health service quality.

  12. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    International Nuclear Information System (INIS)

    Touati, Said; Chennai, Salim; Souli, Aissa

    2015-01-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  13. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    Energy Technology Data Exchange (ETDEWEB)

    Touati, Said; Chennai, Salim; Souli, Aissa [Nuclear Research Centre of Birine, Ain Oussera, Djelfa Province (Algeria)

    2015-07-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  14. Reliability modeling of Clinch River breeder reactor electrical shutdown systems

    International Nuclear Information System (INIS)

    Schatz, R.A.; Duetsch, K.L.

    1974-01-01

    The initial simulation of the probabilistic properties of the Clinch River Breeder Reactor Plant (CRBRP) electrical shutdown systems is described. A model of the reliability (and availability) of the systems is presented utilizing Success State and continuous-time, discrete state Markov modeling techniques as significant elements of an overall reliability assessment process capable of demonstrating the achievement of program goals. This model is examined for its sensitivity to safe/unsafe failure rates, sybsystem redundant configurations, test and repair intervals, monitoring by reactor operators; and the control exercised over system reliability by design modifications and the selection of system operating characteristics. (U.S.)

  15. Electric Power Infrastructure Reliability And Security Research And Development Initiative. Final report

    International Nuclear Information System (INIS)

    Dale, S.; Meeker, R.; Steurer, M.; Li, H.; Pamidi, S.; Rodrigo, H.; Suryanarayanan, S.; Cartes, D.; Ordonez, J.; Domijan, A.; Liu, W.; Cox, D.; McLaren, P.; Hovsapian, R.; Edwards, D.; Simmons, S.; Wilde, N.; Woodruff, S.; Kopriva, D.; Hussaini, Y.; Mohammed, O.; Zheng, J.; Baldwin, T.L.

    2008-01-01

    This is the final scientific/technical report for the Electric Power Infrastructure Reliability and Security R and D Initiative sponsored by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, under award number DE-FG02-05CH11292. This report covers results from the FSU-led, multi-institution effort conducted over the period 8/15/05 to 10/14/2007. Building upon existing infrastructure for power systems research, modeling, and simulation, the Center for Advanced Power Systems (CAPS) at Florida State University (FSU) is developing world-class programs in electric power systems research and education to support future electric power system needs and challenges. With U.S. Department of Energy Support, FSU CAPS has engaged in a multi-faceted effort to conduct basic and applied research towards understanding, developing, and deploying technologies and approaches that can lead to improved reliability and security of the North American electric power generation and delivery infrastructure. This wide-reaching project, through a number of carefully selected thrusts cutting across several research disciplines, set out to address key terrestrial electric utility power system issues and challenges. The challenges and the thrusts to address them were arrived at through analysis of a number of national reports and recommendations combined with input from an experienced multi-disciplined team of power systems research staff and faculty at FSU CAPS. The resulting project effort can be grouped into four major areas: - Power Systems and New Technology Insertion - Controls, Protection, and Security - Simulation Development - High Temperature Superconductivity (HTS)

  16. Enhancing Experiment Central Service Reliability: from delivery to security and virtualization

    CERN Document Server

    Donno, Flavia; Buzykaev, Alexey; Saiz Santos, Maria Dolores

    2011-01-01

    The four LHC experiments rely on experiment specific services running on machines mainly located at CERN. Some of these services have been rated by the experiments as very critical: any loss or degradation of performance has a major impact on the experiment's production and analysis activities. It is therefore important to provide a reliable and robust operational environment. In this work we describe the strategy based on service deployment, security and virtualization adopted to enhance the reliability of ATLAS and CMS central services.

  17. Health service quality scale: Brazilian Portuguese translation, reliability and validity

    Science.gov (United States)

    2013-01-01

    Background The Health Service Quality Scale is a multidimensional hierarchical scale that is based on interdisciplinary approach. This instrument was specifically created for measuring health service quality based on marketing and health care concepts. The aim of this study was to translate and culturally adapt the Health Service Quality Scale into Brazilian Portuguese and to assess the validity and reliability of the Brazilian Portuguese version of the instrument. Methods We conducted a cross-sectional, observational study, with public health system patients in a Brazilian university hospital. Validity was assessed using Pearson’s correlation coefficient to measure the strength of the association between the Brazilian Portuguese version of the instrument and the SERVQUAL scale. Internal consistency was evaluated using Cronbach’s alpha coefficient; the intraclass (ICC) and Pearson’s correlation coefficients were used for test-retest reliability. Results One hundred and sixteen consecutive postoperative patients completed the questionnaire. Pearson’s correlation coefficient for validity was 0.20. Cronbach's alpha for the first and second administrations of the final version of the instrument were 0.982 and 0.986, respectively. For test-retest reliability, Pearson’s correlation coefficient was 0.89 and ICC was 0.90. Conclusions The culturally adapted, Brazilian Portuguese version of the Health Service Quality Scale is a valid and reliable instrument to measure health service quality. PMID:23327598

  18. Pre-Service and In-Service Physics Teachers' Ideas about Simple Electric Circuits

    Science.gov (United States)

    Kucukozer, Huseyin; Demirci, Neset

    2008-01-01

    The aim of the study is to determine pre-service and high school physics teachers' ideas about simple electric circuits. In this study, a test containing eight questions related to simple electric circuits was given to the pre-service physics teachers (32 subjects) that had graduated from Balikesir University, Necatibey Faculty of Education, the…

  19. The impact of scheduling on service reliability : Trip-time determination and holding points in long-headway services

    NARCIS (Netherlands)

    Van Oort, N.; Boterman, J.W.; Van Nes, R.

    2012-01-01

    This paper presents research on optimizing service reliability of longheadway services in urban public transport. Setting the driving time, and thus the departure time at stops, is an important decision when optimizing reliability in urban public transport. The choice of the percentile out of

  20. Netherlands Electricity Regulatory Service DTe. Internet site

    International Nuclear Information System (INIS)

    1999-01-01

    The implementation of the Dutch Electricity Law and the observance of compliance with the law is commissioned to the Netherlands Electricity Regulatory Service DTe. Their Internet site contains several full-text documents related to the tasks of DTe (mainly with respect to tariffs and transportation of electricity)

  1. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Emmanuel [Energetics, Inc., Columbia, MD (United States)

    2018-02-01

    Coal continues to play a critical role in powering the Nation’s electricity generation, especially for baseload power plants. With aging coal generation assets facing decreased performance due to the state of the equipment, and with challenges exacerbated by the current market pressures on the coal sector, there are opportunities to advance early-stage technologies that can retrofit or replace equipment components. These changes will eventually result in significant improvements in plant performance once further developed and deployed by industry. Research and development in areas such as materials, fluid dynamics, fuel properties and preparation characteristics, and a new generation of plant controls can lead to new components and systems that can help improve the efficiency and reliability of coal-fired power plants significantly, allowing these assets to continue to provide baseload power. Coal stockpiles at electricity generation plants are typically large enough to provide 30 to 60 days of power prior to resupply—significantly enhancing the stability and reliability of the U.S. electricity sector. Falling prices for non-dispatchable renewable energy and mounting environmental regulations, among other factors, have stimulated efforts to improve the efficiency of these coal-fired electric generating units (EGUs). In addition, increased reliance on natural gas and non-dispatchable energy sources has spurred efforts to further increase the reliability of coal EGUs. The Coal Powered EGU Efficiency and Reliability Dialogue brought together stakeholders from across the coal EGU industry to discuss methods for improvement. Participants at the event reviewed performance-enhancing innovations in coal EGUs, discussed the potential for data-driven management practices to increase efficiency and reliability, investigated the impacts of regulatory compliance on coal EGU performance, and discussed upcoming challenges for the coal industry. This report documents the key

  2. Reliability in individual monitoring service.

    Science.gov (United States)

    Mod Ali, N

    2011-03-01

    As a laboratory certified to ISO 9001:2008 and accredited to ISO/IEC 17025, the Secondary Standard Dosimetry Laboratory (SSDL)-Nuclear Malaysia has incorporated an overall comprehensive system for technical and quality management in promoting a reliable individual monitoring service (IMS). Faster identification and resolution of issues regarding dosemeter preparation and issuing of reports, personnel enhancement, improved customer satisfaction and overall efficiency of laboratory activities are all results of the implementation of an effective quality system. Review of these measures and responses to observed trends provide continuous improvement of the system. By having these mechanisms, reliability of the IMS can be assured in the promotion of safe behaviour at all levels of the workforce utilising ionising radiation facilities. Upgradation of in the reporting program through a web-based e-SSDL marks a major improvement in Nuclear Malaysia's IMS reliability on the whole. The system is a vital step in providing a user friendly and effective occupational exposure evaluation program in the country. It provides a higher level of confidence in the results generated for occupational dose monitoring of the IMS, thus, enhances the status of the radiation protection framework of the country.

  3. Perceived benefits of adopting Standard – Based pricing mechanism for mechanical and electrical services installations

    Directory of Open Access Journals (Sweden)

    Ganiyu Amuda Yusuf

    2014-06-01

    Full Text Available Cost is an important measure of project success and clients will expect a reliable forecast at the early stage of construction projects to inform their business decision. This study was undertaken to investigate the current practices in managing cost of mechanical and electrical (M&E services in buildings. The perceptions of practitioners on the benefits of adopting Standard – Based Pricing Mechanism for M&E services as used for building fabrics and finishes was ascertained. The methodology adopted for the study was semi – structure interview and questionnaire survey.  Inferential statistics technique was used to analyse the data collected. The results revealed that, M&E services tender documents are often based on lump sum contract. Practitioners are of the opinion that the adoption of Standard – Based Pricing Mechanism (SBPM could enhance the quality of M&E services price forecast; ensure active post contract cost monitoring and control; encourage collaborative working relationship; enhance efficient whole life cycle cost management; improve risk management and facilitate efficient tendering process. The study suggested the development of local Standard Method of Measurement for M&E services and proposed strategies to facilitate the adoption of SBPM as basis for forecasting contract price of mechanical and electrical services in buildings.

  4. Factors influencing the reliability of non-electric detonating circuit in underground uranium mines and preventive measures of misfiring

    International Nuclear Information System (INIS)

    Li Qin

    2010-01-01

    Characteristics of non-electric detonating circuit are introduced. The main factors influencing the reliability of non-electric detonating circuit are described. Taking an underground blasting of a uranium mine for example, the reliability of various kinds of detonating network system is calculated using the reliability theory and numerical analysis method. The reasons that cause the misfiring in non-electric detonating circuit system are analyzed, and preventive measures are put forward.(authors)

  5. Reliability Electrical Power System of Hospital as Cold Standby System

    Directory of Open Access Journals (Sweden)

    Grabski Franciszek

    2016-07-01

    Full Text Available The probabilistic model of a hospital electrical power system consisting of mains, an emergency power system and the automatic transfer switch with the generator starter are discussed in this paper. The reliability model is semi-Markov process describing two different units renewable cold standby system and switch. The embedded Semi-Markov processes concept is applied for description of the system evolution. Time to failure of the system is represented by a random variable denoting the first passage time of the process from the given state to the subset of states. The appropriate theorems of the Semi-Markov processes theory allow us to evaluate the reliability function and some reliability characteristics.

  6. Valuation of Electric Power System Services and Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael C. W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Homer, Juliet S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Balducci, Patrick J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weimar, Mark R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-08-01

    Accurate valuation of existing and new technologies and grid services has been recognized to be important to stimulate investment in grid modernization. Clear, transparent, and accepted methods for estimating the total value (i.e., total benefits minus cost) of grid technologies and services are necessary for decision makers to make informed decisions. This applies to home owners interested in distributed energy technologies, as well as to service providers offering new demand response services, and utility executives evaluating best investment strategies to meet their service obligation. However, current valuation methods lack consistency, methodological rigor, and often the capabilities to identify and quantify multiple benefits of grid assets or new and innovative services. Distributed grid assets often have multiple benefits that are difficult to quantify because of the locational context in which they operate. The value is temporally, operationally, and spatially specific. It varies widely by distribution systems, transmission network topology, and the composition of the generation mix. The Electric Power Research Institute (EPRI) recently established a benefit-cost framework that proposes a process for estimating multiple benefits of distributed energy resources (DERs) and the associated cost. This document proposes an extension of this endeavor that offers a generalizable framework for valuation that quantifies the broad set of values for a wide range of technologies (including energy efficiency options, distributed resources, transmission, and generation) as well as policy options that affect all aspects of the entire generation and delivery system of the electricity infrastructure. The extension includes a comprehensive valuation framework of monetizable and non-monetizable benefits of new technologies and services beyond the traditional reliability objectives. The benefits are characterized into the following categories: sustainability, affordability, and

  7. A Review on the Faults of Electric Machines Used in Electric Ships

    OpenAIRE

    Dionysios V. Spyropoulos; Epaminondas D. Mitronikas

    2013-01-01

    Electric propulsion systems are today widely applied in modern ships, including transport ships and warships. The ship of the future will be fully electric, and not only its propulsion system but also all the other services will depend on electric power. The robust and reliable operation of the ship’s power system is essential. In this work, a review on the mechanical and electrical faults of electric machines that are used in electric ships is presented.

  8. OPTIMIZATION OF THE RELIABILITY OF AGRICULTURAL CONSUMERS ELECTRICITY DISTRIBUTING AND SUPPLY SYSTEMS

    Directory of Open Access Journals (Sweden)

    Lupushor I.

    2007-12-01

    Full Text Available The problems of the optimization reliability in electrical networks of the different class of voltage have probabilistic nature, they discretely change and depend on the number of factors both definite and indefinite and have importance by selection of electric equipment, graph of development of electrical networks and voltage levels. The definition of the major factors, which have determining significance on their value and speed of their change allow to elaborate methods of their optimization and to elaborate effective methods of their growth limitation in electrical networks with the different class of voltage.

  9. Electricity distribution. Price control, reliability and customer services: response to OFFER

    International Nuclear Information System (INIS)

    1994-02-01

    This document presents the views of the National Consumer Council to a recent consultation paper from OFFER, the body responsible for regulation of the United Kingdom electric power industry. The financial performance of the Regional Electricity Companies (RECs) is reviewed by examining how it relates to the prices paid by domestic consumers. A critical analysis is presented of OFFER's notion of the revision of the existing price control mechanism for the distribution businesses within the RECs. Standards of performance, debt and consumer disconnection are also examined. (UK)

  10. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-06-13

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil - by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines are presented.

  11. Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements

    International Nuclear Information System (INIS)

    Zio, E.; Golea, L.R.

    2012-01-01

    The subject of this paper is the analysis of an electrical transmission system with the objective of identifying its most critical elements with respect to failures and attacks. The methodological approach undertaken is based on graph-theoretical (topological) network analysis. Four different perspectives of analysis are considered within the formalism of weighed networks, adding to the purely topological analysis of the system, the reliability and electrical characteristics of its components. In each phase of the analysis: i) a graph-theoretical representation is offered to highlight the structure of the most important system connections according to the particular characteristics examined (topological, reliability, electrical or electrical-reliability), ii) the classical degree index of a network node is extended to account for the different characteristics considered. The application of these concepts of analysis to an electrical transmission system of literature confirms the importance of different perspectives of analysis on such a critical infrastructure. - Highlights: ► We analyze a power system from topological, reliability and electrical perspectives. ► We rank critical components within a vulnerability assessment framework. ► We compute an extended degree to rank critical energy paths. ► We compare several analytical approaches and provide a table for choosing among them. ► We suggest network changes to increase the reliability of highly loaded energy paths.

  12. Assessing the Impact of Imperfect Diagnosis on Service Reliability

    DEFF Research Database (Denmark)

    Grønbæk, Lars Jesper; Schwefel, Hans-Peter; Kjærgaard, Jens Kristian

    2010-01-01

    , representative diagnosis performance metrics have been defined and their closed-form solutions obtained for the Markov model. These equations enable model parameterization from traces of implemented diagnosis components. The diagnosis model has been integrated in a reliability model assessing the impact...... of the diagnosis functions for the studied reliability problem. In a simulation study we finally analyze trade-off properties of diagnosis heuristics from literature, map them to the analytic Markov model, and investigate its suitability for service reliability optimization....

  13. Flexibility and reliability in long-term planning exercises dedicated to the electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Maizi, Nadia; Drouineau, Mathilde; Assoumou, Edi; Mazauric, Vincent

    2010-09-15

    Long-term planning models are useful to build plausible options for future energy systems and must consequently address the technological feasibility and associated cost of these options. This paper focuses on the electricity sector and on problems of flexibility and reliability in power systems in order to improve results provided by long-term planning exercises: flexibility needs are integrated as an additional criterion for new investment decisions and, reliability requirements are assessed through the level of electrical losses they induced and a related cost. These approaches are implemented in a long-term planning model and demonstrated through a study of the Reunion Island.

  14. Electric technology in the food service industry; Les technologies electriques dans les services alimentaires

    Energy Technology Data Exchange (ETDEWEB)

    Labonte, A. [Hydro-Quebec, Montreal, PQ (Canada)

    1997-04-01

    Many innovative technologies in the food service industry have been made through the use of electricity as a source of energy. Electricity made it possible to improve the productivity and profitability of the food industry. Some of these technologies include: (1) cooking by induction, which is based on the principle of magnetic fields, (2) combined convection ovens which accelerate thermal exchange, and (3) electric fryers. The advantages of each technology were described. The environmental advantage of using electricity as an energy source in the food service industry was also discussed.

  15. Drought and Heat Wave Impacts on Electricity Grid Reliability in Illinois

    Science.gov (United States)

    Stillwell, A. S.; Lubega, W. N.

    2016-12-01

    A large proportion of thermal power plants in the United States use cooling systems that discharge large volumes of heated water into rivers and cooling ponds. To minimize thermal pollution from these discharges, restrictions are placed on temperatures at the edge of defined mixing zones in the receiving waters. However, during extended hydrological droughts and heat waves, power plants are often granted thermal variances permitting them to exceed these temperature restrictions. These thermal variances are often deemed necessary for maintaining electricity reliability, particularly as heat waves cause increased electricity demand. Current practice, however, lacks tools for the development of grid-scale operational policies specifying generator output levels that ensure reliable electricity supply while minimizing thermal variances. Such policies must take into consideration characteristics of individual power plants, topology and characteristics of the electricity grid, and locations of power plants within the river basin. In this work, we develop a methodology for the development of these operational policies that captures necessary factors. We develop optimal rules for different hydrological and meteorological conditions, serving as rule curves for thermal power plants. The rules are conditioned on leading modes of the ambient hydrological and meteorological conditions at the different power plant locations, as the locations are geographically close and hydrologically connected. Heat dissipation in the rivers and cooling ponds is modeled using the equilibrium temperature concept. Optimal rules are determined through a Monte Carlo sampling optimization framework. The methodology is applied to a case study of eight power plants in Illinois that were granted thermal variances in the summer of 2012, with a representative electricity grid model used in place of the actual electricity grid.

  16. Reliability and service life of wood structures and buildings

    Directory of Open Access Journals (Sweden)

    Zdeňka Havířová

    2005-01-01

    Full Text Available Service life of constructions and buildings of wood is dependent on temperature and moisture conditions in layers of the building cladding where the wood framework is built in. Temperature/moisture conditions or the corresponding equilibrium moisture content (EMC of the construction show considerable effects on the functional reliability of the whole building from the viewpoint of mechanical resistance and stability (ER1, energy savings and thermal protection (ER6 and hygiene, health and environment protection (ER3. To ensure the reliability of constructions and buildings for the period of their supposed service life a more profound analysis of constructions is necessary from the aspect of a global thermal/technical evaluation.

  17. Nuclear Electric's central dose record service

    International Nuclear Information System (INIS)

    Goldfinch, E.P.; Mullarkey, D.T.; McWhan, A.W.; Risk, G.; Vaughan, L.

    1991-01-01

    This paper describes the conception, development and operation of the Nuclear Electric Central Dose Record Service, including the initial philosophy considered necessary for a database for a large multi-site organisation, the setting up of the data and current routine operation. Lessons learned are briefly described. CDRS holds 35,000 records in a high security environment. The database includes records of radiation doses received by contractor's employees working at Nuclear Electric sites as well as dose records and dose histories for classified and non classified Nuclear Electric employees. (Author)

  18. Electrical equipment service. 1997-1998; Service materiel electrique. 1997-1998

    Energy Technology Data Exchange (ETDEWEB)

    1997-12-31

    This brochure edited by the electrical equipment service from the direction of studies and researches (DER) of Electricite de France (EdF) presents some of their remarkable realizations in the domain of energy, their expertise activity in attendance on electricity producers, forwarders and distributors, their expertise activity in attendance on industrialists, and the know-how of their testing laboratories in attendance on designers and operators. (J.S.)

  19. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-08-03

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil -- by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines will be presented.

  20. Electric Service Areas, Electric Servic Area - given to us from GA power and Planters Electric - distributed by the EMA Director, Val Ashcraft, Published in 2008, 1:2400 (1in=200ft) scale, Effingham County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Electric Service Areas dataset current as of 2008. Electric Servic Area - given to us from GA power and Planters Electric - distributed by the EMA Director, Val...

  1. A Novel Analytic Technique for the Service Station Reliability in a Discrete-Time Repairable Queue

    Directory of Open Access Journals (Sweden)

    Renbin Liu

    2013-01-01

    Full Text Available This paper presents a decomposition technique for the service station reliability in a discrete-time repairable GeomX/G/1 queueing system, in which the server takes exhaustive service and multiple adaptive delayed vacation discipline. Using such a novel analytic technique, some important reliability indices and reliability relation equations of the service station are derived. Furthermore, the structures of the service station indices are also found. Finally, special cases and numerical examples validate the derived results and show that our analytic technique is applicable to reliability analysis of some complex discrete-time repairable bulk arrival queueing systems.

  2. Thermal Management and Reliability of Automotive Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant V [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bennion, Kevin S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cousineau, Justine E [National Renewable Energy Laboratory (NREL), Golden, CO (United States); DeVoto, Douglas J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Feng, Xuhui [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kekelia, Bidzina [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kozak, Joseph P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Major, Joshua [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Moreno, Gilberto [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Paret, Paul P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tomerlin, Jeff J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-09

    Low-cost, high-performance thermal management technologies are helping meet aggressive power density, specific power, cost, and reliability targets for power electronics and electric machines. The National Renewable Energy Laboratory is working closely with numerous industry and research partners to help influence development of components that meet aggressive performance and cost targets through development and characterization of cooling technologies, and thermal characterization and improvements of passive stack materials and interfaces. Thermomechanical reliability and lifetime estimation models are important enablers for industry in cost-and time-effective design.

  3. Reliability analysis of service water system under earthquake

    International Nuclear Information System (INIS)

    Yu Yu; Qian Xiaoming; Lu Xuefeng; Wang Shengfei; Niu Fenglei

    2013-01-01

    Service water system is one of the important safety systems in nuclear power plant, whose failure probability is always gained by system reliability analysis. The probability of equipment failure under the earthquake is the function of the peak acceleration of earthquake motion, while the occurrence of earthquake is of randomicity, thus the traditional fault tree method in current probability safety assessment is not powerful enough to deal with such case of conditional probability problem. An analysis frame was put forward for system reliability evaluation in seismic condition in this paper, in which Monte Carlo simulation was used to deal with conditional probability problem. Annual failure probability of service water system was calculated, and failure probability of 1.46X10 -4 per year was obtained. The analysis result is in accordance with the data which indicate equipment seismic resistance capability, and the rationality of the model is validated. (authors)

  4. A Fast Optimization Method for Reliability and Performance of Cloud Services Composition Application

    Directory of Open Access Journals (Sweden)

    Zhao Wu

    2013-01-01

    Full Text Available At present the cloud computing is one of the newest trends of distributed computation, which is propelling another important revolution of software industry. The cloud services composition is one of the key techniques in software development. The optimization for reliability and performance of cloud services composition application, which is a typical stochastic optimization problem, is confronted with severe challenges due to its randomness and long transaction, as well as the characteristics of the cloud computing resources such as openness and dynamic. The traditional reliability and performance optimization techniques, for example, Markov model and state space analysis and so forth, have some defects such as being too time consuming and easy to cause state space explosion and unsatisfied the assumptions of component execution independence. To overcome these defects, we propose a fast optimization method for reliability and performance of cloud services composition application based on universal generating function and genetic algorithm in this paper. At first, a reliability and performance model for cloud service composition application based on the multiple state system theory is presented. Then the reliability and performance definition based on universal generating function is proposed. Based on this, a fast reliability and performance optimization algorithm is presented. In the end, the illustrative examples are given.

  5. Electricity. Metering and services: a natural marriage; Electricite. Comptage et services: un mariage naturel

    Energy Technology Data Exchange (ETDEWEB)

    Laurent, M.

    2002-07-01

    The metering of electricity is no longer only a problem of automatic recording. With the deregulation of electricity markets, a strong potential of services with added value has been included in the metering activity. These services use the new communication means (Internet) to supply some convenient indicators to the clients: consumption data, energy performances and costs etc.. (J.S.)

  6. Analysis of performance reliability of electrical and electronic equipment of car-tractor

    Directory of Open Access Journals (Sweden)

    Kravchenko О.Р.

    2016-08-01

    Full Text Available The analysis of the operational reliability of electrical and electronic equipment of vehicles, trucks Mercedes-Benz Actros 1844 LS and Volvo FH 1242, conducting international cargo transportation is performed. It is established that the equipment is reliable, which meets modern requirements, but where there is a violation of the resolution. The reason for repair work is constructive and operational factors. Distribution of efficiency and overall performance of operational reliability is retrieved. Items with more bounce are found. Common factors of violation of efficiency cars, trucks in operation, are largely different stages in warranty runs are obtained.

  7. Reliability Assessment of Offshore Wind Turbines Considering Faults of Electrical / Mechanical Components

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Sørensen, John Dalsgaard

    2013-01-01

    For offshore wind turbines, the cost contribution to Cost of Energy from inspections and Operation & Maintenance can be substantial, and can be expected to increase when wind farms are placed at deeper water depths, further from the coast and in more harsh environments. Estimates of the reliability...... is considered and related to reliability estimation by taking into account faults e.g. due to failure of an electrical component or loss of grid....

  8. Reliability analysis of the service water system of Angra 1 reactor

    International Nuclear Information System (INIS)

    Tayt-Sohn, L.C.; Oliveira, L.F.S. de.

    1984-01-01

    A reliability analysis of the service water system is done aiming to use in the evaluation of the non reliability of the Component Cooling System (SRC) for great loss of cooling accidents in nuclear power plants. (E.G.) [pt

  9. Reliability analysis of the service water system of Angra 1 reactor

    International Nuclear Information System (INIS)

    Oliveira, L.F.S. de; Fleming, P.V.; Frutuoso e Melo, P.F.F.; Tayt-Sohn, L.C.

    1983-01-01

    A reliability analysis of the service water system is done aiming to use in the evaluation of the non reliability of the component cooling system (SRC) for great loss of cooling accidents in nuclear power plants. (E.G.) [pt

  10. Staff Report to the Secretary on Electricity Markets and Reliability

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-01

    Energy Secretary Rick Perry issued a memo in April of 2017 requesting a study and directing his staff to develop a report to include an assessment of the reliability and resilience of the electric grid and an overview of the evolution of electricity markets. Various factors have emerged over the past 15 years which have impacted power supply and demand in different ways. This study, prepared by experts throughout the Department, contains a comprehensive analysis of these factors and the corresponding data, and presents a series of recommendations meant to inform and guide policy makers, regulators, and the general public. Potential areas for further research are also presented.

  11. Take Advantage of Wasteful Batang Hari Irrigation For Electricity Services Improvement

    Directory of Open Access Journals (Sweden)

    Bambang Istijono

    2015-03-01

    Full Text Available This paper describes the Batang Hari Irrigation prospect to meet the electricity needs in its surrounding area in order to increase the electrical service for every level society. The use of Batang Hari irrigation is far from its capacity. Un-used water and infrastructures from Batang Hari irrigation can be used to generate hydro-electric. Based on  the results of this study, it can be concluded that the Batang Hari Irrigation can be used to generate electricity power up to  1.6 MW. This hydro power service can increase the level of electric service in West Sumatra Province more than 1%

  12. Stratum Electricity Markets: Toward Multi-temporal Distributed Risk Management for Sustainable Electricity Provision

    Science.gov (United States)

    Wu, Zhiyong (Richard)

    Motivated by the overall challenge of ensuring long-term sustainable electricity service, we view this challenge as a long-term decision making problem under uncertainties. We start by recognizing that, independent of the industry organization, the uncertainties are enormous and often exogenous to the energy service providers. They are multi-dimensional and are result of fundamental drivers, ranging from the supply side, through the demand side, to the regulatory and policy sides. The basic contribution of this thesis comes from the recognition that long-term investments for ensuring reliable and stable electricity service critically depend on how these uncertainties are perceived, valued and managed by the different stakeholders within the complex industry organization such as the electric power industry. We explain several reasons why price signals obtained from current short-term electricity markets alone are not sufficient enough for long-term sustainable provision. Some enhancements are presented in the thesis to improve the short-term electricity market price signals to reflect the true cost of operation. New market mechanisms and instruments are needed to facilitate the stakeholders to better deal with long-term risks. The problems of ensuring long-term stable reliable service in the sense of the traditional resource adequacy requirements are revisited in both the restructuring industry and regulated industry. We introduce a so-called Stratum Electricity Market (SEM) design as the basic market mechanism for solving the problem of long-term reliable electricity service through a series of interactive multi-lateral market exchange platforms for risks communication, management and evaluations over various time horizons and by the different groups of stakeholders. In other words, our proposed SEM is a basic IT-enabled framework for the decision making processes by various parties over different time. Because of the uniqueness of electricity as a commodity, the

  13. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  14. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1990-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  15. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1987-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  16. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1988-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  17. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Tanaskovic, M.

    1995-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  18. Increasing the reliability of electric energy supply to consumers in ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Barta, Ioan; Hanes, Marian . E-mail electrica@romag.ro

    2004-01-01

    Full text: This work aims at achieving an analysis of time evolution of the status of electrical installations, their performances and reliability, at describing the refurbishment measures adopted, at assessing the efficiency of these measures and also to suggest solutions for improving the reliability in the electric energy supply of ROMAG-PROD Heavy Water Plant. The analysis started from the original design, the manner the electrical installations were mounted, the technological level of this equipment and gives an evaluation of the deficiencies and the evolution of incidents occurred during the operation period. On the basis of the experience gathered one advances new items for equipment renewing and refurbishment of electric installations which together with the existing ones would ensure an electric energy supply more secure and efficient, leading directly to a more safe and efficient operation of the ROMAG-PROD Heavy Water Plant. In this work the incidents of electric energy nature which occurred are analyzed, the equipment which generated events identified and measures to solve these problems proposed

  19. 78 FR 7773 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Science.gov (United States)

    2013-02-04

    ... Board of Trustees Meetings, Board of Trustees Compliance Committee, Corporate Governance and Human Resources Committee, and Standards Oversight and Technology Committee Meetings. Hotel del Coronado, 1500... Association, Inc. v. Western Electric Coordinating Council and North American Electric Reliability Corporation...

  20. Reliable LED Lighting Technologies: Key Factors and Procurement Guidance

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Lynn; Arquit Niederberger, Anne

    2015-10-08

    Abstract— Lighting systems have the ability to transform the economic and educational infrastructure of disadvantaged communities, and eradicating “light poverty” has become one of the primary goals of the International Year of Light 2015. Solid-state lighting (SSL) technology, based on light-emitting diode (LED) light sources, has emerged as the next generation of lighting technology, with a current global market penetration of roughly 5%. This paper will report on recent research on understanding SSL lighting system reliability (failure modes, environmental stressors, electrical power quality); discuss the implications of SSL technology reliability for providing lighting services; and suggest practical approaches to ensure SSL reliability to benefit humanity. Among the key findings from this work is that LED sources can be extremely reliable, withstanding a broad range of environmental stresses without failure. Nonetheless, SSL lighting systems can have a negative impact on electrical power reliability, as well as on the affordability of lighting services, without attention to the quality of the accompanying power infrastructure. It is therefore critical to ensure that the performance of the power supply electronics used in lighting systems is matched to the quality of the power source, when evaluating energy efficient lighting choices.

  1. Distribution reliability in the reformed New Zealand electricity industry

    International Nuclear Information System (INIS)

    McGlinchy, B. J.

    1997-01-01

    The process of deregulating the electric power industry in New Zealand, which began in 1984, and is now a fully competitive system, was described. The industry is not only fully competitive, but enjoys the distinction of being subject only to very light-handed regulation. The regulation requires each company within the industry to publish an annual financial statement, the rate of profit and some performance indicators including reliability indices. Companies also report on faults in lines and cables, and on a voluntary basis they contribute to a 'by cause' survey, using indicators developed by the Canadian Electricity Association. It is expected that the indices that will be developed from this data will be used as benchmarks for performance. The data could also be used for probability analysis in system expansion programs. 6 refs., 7 figs

  2. Reliability of piping system components. Framework for estimating failure parameters from service data

    International Nuclear Information System (INIS)

    Nyman, R.; Hegedus, D.; Tomic, B.; Lydell, B.

    1997-12-01

    This report summarizes results and insights from the final phase of a R and D project on piping reliability sponsored by the Swedish Nuclear Power Inspectorate (SKI). The technical scope includes the development of an analysis framework for estimating piping reliability parameters from service data. The R and D has produced a large database on the operating experience with piping systems in commercial nuclear power plants worldwide. It covers the period 1970 to the present. The scope of the work emphasized pipe failures (i.e., flaws/cracks, leaks and ruptures) in light water reactors (LWRs). Pipe failures are rare events. A data reduction format was developed to ensure that homogenous data sets are prepared from scarce service data. This data reduction format distinguishes between reliability attributes and reliability influence factors. The quantitative results of the analysis of service data are in the form of conditional probabilities of pipe rupture given failures (flaws/cracks, leaks or ruptures) and frequencies of pipe failures. Finally, the R and D by SKI produced an analysis framework in support of practical applications of service data in PSA. This, multi-purpose framework, termed 'PFCA'-Pipe Failure Cause and Attribute- defines minimum requirements on piping reliability analysis. The application of service data should reflect the requirements of an application. Together with raw data summaries, this analysis framework enables the development of a prior and a posterior pipe rupture probability distribution. The framework supports LOCA frequency estimation, steam line break frequency estimation, as well as the development of strategies for optimized in-service inspection strategies

  3. Reliability of piping system components. Framework for estimating failure parameters from service data

    Energy Technology Data Exchange (ETDEWEB)

    Nyman, R [Swedish Nuclear Power Inspectorate, Stockholm (Sweden); Hegedus, D; Tomic, B [ENCONET Consulting GesmbH, Vienna (Austria); Lydell, B [RSA Technologies, Vista, CA (United States)

    1997-12-01

    This report summarizes results and insights from the final phase of a R and D project on piping reliability sponsored by the Swedish Nuclear Power Inspectorate (SKI). The technical scope includes the development of an analysis framework for estimating piping reliability parameters from service data. The R and D has produced a large database on the operating experience with piping systems in commercial nuclear power plants worldwide. It covers the period 1970 to the present. The scope of the work emphasized pipe failures (i.e., flaws/cracks, leaks and ruptures) in light water reactors (LWRs). Pipe failures are rare events. A data reduction format was developed to ensure that homogenous data sets are prepared from scarce service data. This data reduction format distinguishes between reliability attributes and reliability influence factors. The quantitative results of the analysis of service data are in the form of conditional probabilities of pipe rupture given failures (flaws/cracks, leaks or ruptures) and frequencies of pipe failures. Finally, the R and D by SKI produced an analysis framework in support of practical applications of service data in PSA. This, multi-purpose framework, termed `PFCA`-Pipe Failure Cause and Attribute- defines minimum requirements on piping reliability analysis. The application of service data should reflect the requirements of an application. Together with raw data summaries, this analysis framework enables the development of a prior and a posterior pipe rupture probability distribution. The framework supports LOCA frequency estimation, steam line break frequency estimation, as well as the development of strategies for optimized in-service inspection strategies. 63 refs, 30 tabs, 22 figs.

  4. power system reliability in supplying nuclear reactors

    International Nuclear Information System (INIS)

    Gad, M.M.M.

    2007-01-01

    this thesis presents a simple technique for deducing minimal cut set (MCS) from the defined minimal path set (MPS) of generic distribution system and this technique have been used to evaluate the basic reliability indices of Egypt's second research reactor (ETRR-2) electrical distribution network. the alternative system configurations are then studied to evaluate their impact on service reliability. the proposed MCS approach considers both sustained and temporary outage. the temporary outage constitutes an important parameter in characterizing the system reliability indices for critical load point in distribution system. it is also consider the power quality impact on the reliability indices

  5. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  6. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  7. Reliability theory for repair service organization simulation and increase of innovative attraction of industrial enterprises

    Science.gov (United States)

    Dolzhenkova, E. V.; Iurieva, L. V.

    2018-05-01

    The study presents the author's algorithm for the industrial enterprise repair service organization simulation based on the reliability theory, as well as the results of its application. The monitoring of the industrial enterprise repair service organization is proposed to perform on the basis of the enterprise's state indexes for the main resources (equipment, labour, finances, repair areas), which allows quantitative evaluation of the reliability level as a resulting summary rating of the said parameters and the ensuring of an appropriate level of the operation reliability of the serviced technical objects. Under the conditions of the tough competition, the following approach is advisable: the higher efficiency of production and a repair service itself, the higher the innovative attractiveness of an industrial enterprise. The results of the calculations show that in order to prevent inefficient losses of production and to reduce the repair costs, it is advisable to apply the reliability theory. The overall reliability rating calculated on the basis of the author's algorithm has low values. The processing of the statistical data forms the reliability characteristics for the different workshops and services of an industrial enterprise, which allows one to define the failure rates of the various units of equipment and to establish the reliability indexes necessary for the subsequent mathematical simulation. The proposed simulating algorithm contributes to an increase of the efficiency of the repair service organization and improvement of the innovative attraction of an industrial enterprise.

  8. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Karic, Z.

    2002-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. Activity plan for year 2002 is included [sr

  9. Value-Added Electricity Services: New Roles for Utilities and Third-Party Providers

    Energy Technology Data Exchange (ETDEWEB)

    Blansfield, J. [Inst. for Electric Innovations, Washington, DC (United States); Wood, L. [Inst. for Electric Innovations, Washington, DC (United States); Katofsky, R. [Advanced Energy Economy, Washington, DC (United States); Stafford, B. [Advanced Energy Economy, Washington, DC (United States); Waggoner, D. [Advanced Energy Economy, Washington, DC (United States); Schwartz, L. C. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-10-30

    New energy generation, storage, delivery, and end-use technologies support a broad range of value-added electricity services for retail electricity customers. Sophisticated energy management services, distributed generation coupled with storage, and electric vehicle charging are just a few examples of emerging offerings. Who should provide value-added services — utilities or third parties, or both, and under what conditions? What policy and regulatory changes may be needed to promote competition and innovation, to account for utility costs to enable these services, and to protect consumers? The report approaches the issues from three perspectives: utilities, third-party service providers, and consumers: -Jonathan Blansfield and Lisa Wood, Institute for Electric Innovation -Ryan Katofsky, Benjamin Stafford and Danny Waggoner, Advanced Energy Economy -National Association of State Utility Consumer Advocates

  10. Reliability measurement for mixed mode failures of 33/11 kilovolt electric power distribution stations.

    Directory of Open Access Journals (Sweden)

    Faris M Alwan

    Full Text Available The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.

  11. 77 FR 59745 - Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation...

    Science.gov (United States)

    2012-10-01

    ...; Order No. 766] Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation... rule. SUMMARY: The Commission is issuing this Final Rule to revise its delegations of authority to... delegation agreements, and ERO policies and procedures. DATES: This rule is effective October 1, 2012. FOR...

  12. Reliable CPS design for mitigating semiconductor and battery aging in electric vehicles

    NARCIS (Netherlands)

    Chang, W.; Proebstl, A.; Goswami, D.; Zamani, M.; Chakraborty, S.

    2015-01-01

    Reliability and performance of cyber-physical systems (CPS) in electric vehicles (EVs) are influenced by three design aspects: (i) controller design, (ii) battery usage, i.e., Battery rate capacity and aging effects, (iii) processor aging of the in-vehicle embedded platform. In this paper, we

  13. Reliable execution based on CPN and skyline optimization for Web service composition.

    Science.gov (United States)

    Chen, Liping; Ha, Weitao; Zhang, Guojun

    2013-01-01

    With development of SOA, the complex problem can be solved by combining available individual services and ordering them to best suit user's requirements. Web services composition is widely used in business environment. With the features of inherent autonomy and heterogeneity for component web services, it is difficult to predict the behavior of the overall composite service. Therefore, transactional properties and nonfunctional quality of service (QoS) properties are crucial for selecting the web services to take part in the composition. Transactional properties ensure reliability of composite Web service, and QoS properties can identify the best candidate web services from a set of functionally equivalent services. In this paper we define a Colored Petri Net (CPN) model which involves transactional properties of web services in the composition process. To ensure reliable and correct execution, unfolding processes of the CPN are followed. The execution of transactional composition Web service (TCWS) is formalized by CPN properties. To identify the best services of QoS properties from candidate service sets formed in the TCSW-CPN, we use skyline computation to retrieve dominant Web service. It can overcome that the reduction of individual scores to an overall similarity leads to significant information loss. We evaluate our approach experimentally using both real and synthetically generated datasets.

  14. A customer oriented systematic framework to extract business strategy in Indian electricity services

    Science.gov (United States)

    Satapathy, Suchismita; Mishra, Pravudatta

    2013-11-01

    Competition in the electric service industry is highlighting the importance of a number of issues affecting the nature and quality of customer service. The quality of service(s) provided to electricity customers may be enhanced by competition, if doing so offers service suppliers a competitive advantage. On the other hand, service quality offered to some consumers could decline if utilities focus their attention on those customers most likely to exercise choice, while reducing effort and investment to serve customers less likely to choose alternatives. Service quality is defined as the way in which the utility interacts with and responds to the needs of its customers. To achieve maximum consumer satisfaction in electricity service, This paper has designed a framework by QFD by measuring service quality of electricity utility sector in ANN and also find interrelationship between these design requirements by ISM.

  15. Service Offering at Electrical Equipment Manufacturers

    Directory of Open Access Journals (Sweden)

    Lucie Kaňovská

    2015-09-01

    Full Text Available Purpose of the article: The aim of the paper is to uncover ways of managing service offering provided by electrical equipment manufactures in the Czech Republic. The segment is extremely important for Czech industry nowadays, especially because of many companies being subcontractors for the car industry and mechanical engineering. The producers of electric equipment comply with the Czech industry classification CZ-NACE 27. Methodology/methods: The questionnaire in the form of the Likert scale was prepared to gather information about customer services. The respondents were usually directors or managers, e.g. employees with high competencies of knowing customer services in this particular market. The total of 22 companies were included in the survey. Research was focused on the following industries classifications belonging to CZ-NACE 27: CZ-NACE 27, CZ-NACE 271 and CZ-NACE 273. According to Czech Statistical Office the total number of companies belonging to these 3 segments is 136. It means 16,2% companies belonging to CZ-NACE 27 participated in our research. Basic statistical methods were used to analyse the complete database. Scientific aim: The paper deals with the problem of service offering provided by today’s manufacturers. Global understanding of services that manufacturers really develop, sell, deliver and manage is still limited. Findings: Managing service offering provided by today‘s manufacturers shows that 1 Manufacturers not offer only tangible products, but also wide range of services and even information and support. 2 New products are not designed only according to company technicians, but also according to their customers. Their products and services are developed, tested and improved according to their needs. 3 Services provide complex customer care from time product selection to its end. Conclusions: Manufacturers of tangible products need to enlarge their product offering to be able to satisfy customers. Therefore

  16. IMPROVING THE RELIABILITY OF THE POWER CIRCUIT OF THE ELECTRIC TRAINS ЕР2Т AND ЕПЛ2Т

    Directory of Open Access Journals (Sweden)

    N. H. Visin

    2010-02-01

    Full Text Available The transitional processes in shunt circuit of traction engines, which armatures and excitation windings are connected in non-conducting direction as to the flowing power current, are considered in this paper. The changes in the control circuits of braking switch and in the shunt power circuit of traction engines with additional mounting a resistor of 0.5 Ohm are proposed. All this modernization will allow increasing greatly the operation reliability of power circuit of ЭР2Т and ЕПЛ2Т electric locomotives during their service life.

  17. What do customers want from improved residential electricity services? Evidence from a choice experiment

    International Nuclear Information System (INIS)

    Huh, Sung-Yoon; Woo, JongRoul; Lim, Sesil; Lee, Yong-Gil; Kim, Chang Seob

    2015-01-01

    Improvements in customer satisfaction as well as product/service quality represent a common objective of all businesses, and electricity services are no exception. Using choice experiments and a mixed logit model, this study quantitatively analyzes customers' preferences and their marginal willingness to pay for improved residential electricity services. The study provides an ex ante evaluation of customers' acceptance of hypothetical electricity services. According to the results, customers consider the electricity bill and the electricity mix as the two most important attributes when choosing their electricity services. Customers are willing to pay 2.2% more in the average electricity bill (an additional monthly electricity bill of KRW 1,064; USD 0.96) for a significant increase in the share of renewable energy, which is far less than the actual cost of achieving this renewable target. Therefore, it is better to maintain the current electricity mix in principle, and the renewable share should be gradually expanded instead of making a sudden change in the electricity mix. In addition, customers are willing to pay KRW 6,793 (USD 6.15) more to reduce blackouts once in a year and KRW 64/year (USD 0.06/year) to reduce a minute of each blackout. -- Highlights: •Customers' preferences for improved residential electricity services are analyzed. •Empirical setting is a sample of residents in South Korea. •The electricity bills and electricity mix are important to customers. •Increase in electricity bill of different electricity mix is considered

  18. Electrical safety in health care area

    International Nuclear Information System (INIS)

    Amer, G.M.

    2011-01-01

    An electrical safety in health care area is necessary to protect patients and staff from potential electrical hazards.Functional, accurate and safe clinical equipment is an essential requirement in the provision of health services. Well-maintained equipment will give clinicians greater confidence in the reliability of its performance and contribute to a high standard of client care. Clinical equipment, like all health services, requires annual or periodic servicing of medical equipment. In addition to planned servicing and preventative maintenance, there may be the unexpected failure of medical (and other) equipment, necessitating repair. In general, clinical equipment that has an electrical power source and has direct contact with the client must be serviced as a first priority. In this presentation, a review of the main concepts related to the electrical safety in health area,theinternational standard, the distribution of electric power in hospital and protection against shockwill be introduced. Protection system in hospital will be presented in its two ways: inpower distribution in hospitaland inbiomedical equipment design,finally the optimum maintenance technology and safety tests in health care areawill presented also.

  19. Assessing the Energy Content of System Frequency and Electric Vehicle Charging Efficiency for Ancillary Service Provision

    DEFF Research Database (Denmark)

    Thingvad, Andreas; Ziras, Charalampos; Hu, Junjie

    2017-01-01

    The purpose of this paper is to quantify the effect of biased system frequency deviations and charger losses in order for an aggregation of electric vehicles (EVs) to provide reliable primary frequency control (PFC). A data set consisting of one year of frequency measurements of the Nordic....... Additionally, a method for calculating the expected energy loss caused by continuous charging and discharging is presented together with efficiency measurements of a commercial bidirectional EV charger. It is found that during a year, the energy balance of the service provider, relative to the grid, is within...

  20. Enhanced Reliability of Photovoltaic Systems with Energy Storage and Controls

    Energy Technology Data Exchange (ETDEWEB)

    Manz, D.; Schelenz, O.; Chandra, R.; Bose, S.; de Rooij, M.; Bebic, J.

    2008-02-01

    This report summarizes efforts to reconfigure loads during outages to allow individual customers the opportunity to enhance the reliability of their electric service through the management of their loads, photovoltaics, and energy storage devices.

  1. Study the Effect of Value-Added of Services Sector on Forecasting of Electricity Demand in Services Sector due to Price Reform

    Directory of Open Access Journals (Sweden)

    Sayed Mahdi Mostafavi

    2016-07-01

    Full Text Available Electrical energy is as one of the important effective factors on economic growth and development. In recent decades, numerous studies in different countries to estimate and forecast electricity demand in different parts of the economy have been made. In this paper, using the method ARDL, estimation and forecasting of electricity demand in the services sector of Iran are determined for the time period from 1983 to 2012. Estimated equations show that the added value of the services sector and a significant positive impact on the demand for electricity in this sector. The price elasticity for services sector is smaller than 1 due to low electricity prices and subsidized electricity. Hence, electricity prices have little impact on the demand for electricity. The results of the estimate represents a long-term relationship between the variables in the services sector. In this paper, based on amendments to the law on subsidies and estimated values, anticipated electricity demand until the end of the fifth development plan was carried out. The results indicate an increase in power consumption in the services sector.

  2. Energy- and value added services in the electric power market in Sweden

    International Nuclear Information System (INIS)

    Matsson, Peter

    2000-03-01

    This report tries to give a comprehensive picture of the offerings of energy- and value added services on the deregulated Swedish electric power market. A compilation of the service offerings from some 50 electric utilities is given. Market movements within deregulated sectors are treated with special emphasis on the electric power business

  3. Engineering and Design: Reliability Analysis of Navigation Lock and Dam Mechanical and Electrical Equipment

    National Research Council Canada - National Science Library

    Beranek, Dwight

    2001-01-01

    This engineer technical letter (ETL) provides guidance for assessing the reliability of mechanical and electrical systems of navigation locks and dams and for establishing an engineering basis for major rehabilitation investment decisions...

  4. Automated Energy Distribution and Reliability System Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Buche, D. L.; Perry, S.

    2007-10-01

    This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects.

  5. Improvement of AC motor reliability from technique standardization

    International Nuclear Information System (INIS)

    Muniz, P.R.; Faria, M.D.R.; Mendes, M.P.; Silva, J.N.; Dos Santos, J.D.

    2005-01-01

    The purpose of this paper is to explain the increase of reliability of motors serviced in the Electrical Maintenance Shop of Companhia Siderurgica de Tubarao by standardization of the technique based on Brazilian and International Standards, manufacturer's recommendations and the experience of the maintenance staff. (author)

  6. Covering of the electric power service

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    In this article it is sought to deepen more in the topic of the covering of the electric power service, especially in the related with the mechanisms that could facilitate their amplification. In the new market outline, in the one that the participation of the agents is encouraged in all the activities of the chain of services in which the state is not direct lender of the same one, it is confused the form like a covering will be achieved that is of agreement with the goals that intend in the national plan of development and in the sub sectorial plans. Although the rules of the market one comes consolidating, the process of linking of the private capital, especially in the distribution activity, it evidences the importance of to settle down and to define responsibilities and explicit mechanisms in the topic of expansion of the covering. A first interpretation of the ruled indicates the obligation of the state of extending the covering to 100% and of assuming the projects that don't undertake the matters. This would be the reading from the traditional mentality. However, the regulation of you public services of electricity don't demand a total covering, but rather it covers to the users that have the capacity to assume, with their own resources, the efficient costs of benefit. The service will also be lent to residential users that don't have payment capacity, when there are contribution resources or fiscal resources for subsidiary

  7. Final Report to the National Energy Technology Laboratory on FY09-FY13 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Vittal, Vijay [Arizona State Univ., Mesa, AZ (United States)

    2015-11-04

    The Consortium for Electric Reliability Technology Solutions (CERTS) was formed in 1999 in response to a call from U.S. Congress to restart a federal transmission reliability R&D program to address concerns about the reliability of the U.S. electric power grid. CERTS is a partnership between industry, universities, national laboratories, and government agencies. It researches, develops, and disseminates new methods, tools, and technologies to protect and enhance the reliability of the U.S. electric power system and the efficiency of competitive electricity markets. It is funded by the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE). This report provides an overview of PSERC and CERTS, of the overall objectives and scope of the research, a summary of the major research accomplishments, highlights of the work done under the various elements of the NETL cooperative agreement, and brief reports written by the PSERC researchers on their accomplishments, including research results, publications, and software tools.

  8. Balancing services in smart electricity grids enabled by market-driven software agents

    NARCIS (Netherlands)

    Warmer, C.J.; Kamphuis, I.G.; Hermans, R.M.; Frunt, J.; Jokic, A.; Bosch, van den P.P.J.

    2010-01-01

    An important prerequisite for reliable and stable operation of electrical power grids is that supply and demand of power are balanced at all times. In traditional, centrally-controlled electrical power networks, real-time balancing is usually implemented by adjusting large-scale generation to

  9. Conjoint Analysis for New Service Development on Electricity Distribution in Indonesia

    Science.gov (United States)

    Widaningrum, D. L.; Chynthia; Astuti, L. D.; Seran, M. A. B.

    2017-07-01

    Many cases of illegal use of electricity in Indonesia is still rampant, especially for activities where the power source is not available, such as in the location of street vendors. It is not only detrimental to the state, but also harm the perpetrators of theft of electricity and the surrounding communities. The purpose of this study is to create New Service Development (NSD) to provide a new electricity source for street vendors' activity based on their preferences. The methods applied in NSD is Conjoint Analysis, Cluster Analysis, Quality Function Deployment (QFD), Service Blueprint, Process Flow Diagrams and Quality Control Plan. The results of this study are the attributes and their importance in the new electricity’s service based on street vendors’ preferences as customers, customer segmentation, service design for new service, designing technical response, designing operational procedures, the quality control plan of any existing operational procedures.

  10. A reliability design method for a lithium-ion battery pack considering the thermal disequilibrium in electric vehicles

    Science.gov (United States)

    Xia, Quan; Wang, Zili; Ren, Yi; Sun, Bo; Yang, Dezhen; Feng, Qiang

    2018-05-01

    With the rapid development of lithium-ion battery technology in the electric vehicle (EV) industry, the lifetime of the battery cell increases substantially; however, the reliability of the battery pack is still inadequate. Because of the complexity of the battery pack, a reliability design method for a lithium-ion battery pack considering the thermal disequilibrium is proposed in this paper based on cell redundancy. Based on this method, a three-dimensional electric-thermal-flow-coupled model, a stochastic degradation model of cells under field dynamic conditions and a multi-state system reliability model of a battery pack are established. The relationships between the multi-physics coupling model, the degradation model and the system reliability model are first constructed to analyze the reliability of the battery pack and followed by analysis examples with different redundancy strategies. By comparing the reliability of battery packs of different redundant cell numbers and configurations, several conclusions for the redundancy strategy are obtained. More notably, the reliability does not monotonically increase with the number of redundant cells for the thermal disequilibrium effects. In this work, the reliability of a 6 × 5 parallel-series configuration is the optimal system structure. In addition, the effect of the cell arrangement and cooling conditions are investigated.

  11. Community liberalisation of the electric power market and public service obligations

    International Nuclear Information System (INIS)

    Cristoforetti, Brice

    2008-06-01

    After an overview of original economic and social objectives at the basis of the creation of the European common market, the author examines whether the Community liberalisation of the European domestic electricity market has been an opportunity to acknowledge public service obligations in the European law, and more particularly examines the existence or relevance of the notion of electric power public service. This discussion addresses a period extending from the beginning of the 1960's to the Lisbon Treaty prepared in 2007. The author analyses rules of the European law, and the modalities and consequences of their adoption in the French law, as he considers that the evolution of French administrative legal evolution is the most relevant framework for this study on public service and electric power market. Thus, he first shows that the sector liberalisation, through the conflict between competition and defence of the general interest, actually allowed the existence of public service obligations for State members to be consecrated by the Community law. However, through the study of the electric power public service, the author shows that ambitions which had been initially put forward, are hardly compatible with some modalities of opening to competition

  12. Reliability assessment of serviceability performance of braced retaining walls using a neural network approach

    Science.gov (United States)

    Goh, A. T. C.; Kulhawy, F. H.

    2005-05-01

    In urban environments, one major concern with deep excavations in soft clay is the potentially large ground deformations in and around the excavation. Excessive movements can damage adjacent buildings and utilities. There are many uncertainties associated with the calculation of the ultimate or serviceability performance of a braced excavation system. These include the variabilities of the loadings, geotechnical soil properties, and engineering and geometrical properties of the wall. A risk-based approach to serviceability performance failure is necessary to incorporate systematically the uncertainties associated with the various design parameters. This paper demonstrates the use of an integrated neural network-reliability method to assess the risk of serviceability failure through the calculation of the reliability index. By first performing a series of parametric studies using the finite element method and then approximating the non-linear limit state surface (the boundary separating the safe and failure domains) through a neural network model, the reliability index can be determined with the aid of a spreadsheet. Two illustrative examples are presented to show how the serviceability performance for braced excavation problems can be assessed using the reliability index.

  13. Frequency-Control Reserves and Voltage Support from Electric Vehicles

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2013-01-01

    The increasing penetration of variable wind power generation units and electricity consumption in power systems demands additional ancillary services for its reliable operation. The battery storages of electric vehicles are one of the substitute solutions for replacing conventional fossil......-fuelled generators to supply future grid support functions. The quick start and fast response characteristics of battery storages enable the electric vehicles to provide most of the power system auxiliary tasks. This chapter discusses key ancillary services that could be supplied by electric vehicles to maintain...... the system balance in power systems with high volumes of wind power generation. To analyse the applications and performance of electric vehicles in supplying active power balancing services, the case studies simulated in wind-power-dominated Danish power systems are also presented....

  14. Potential For Plug-In Electric Vehicles To Provide Grid Support Services

    Energy Technology Data Exchange (ETDEWEB)

    Dias, F. G.; Luo, Y.; Mohanpurkar, M.; Hovsapian, R.; Scoffield, D.

    2017-04-01

    Since the modern-day introduction of plug-in electric vehicles (PEVs), scientists have proposed leveraging PEV battery packs as distributed energy resources for the electric grid. PEV charging can be controlled not only to provide energy for transportation but also to provide grid services and to facilitate the integration of renewable energy generation. With renewable generation increasing at an unprecedented rate, most of which is non-dispatchable and intermittent, the concept of using PEVs as controllable loads is appealing to electric utilities. This additional functionality could also provide value to PEV owners and drive PEV adoption. It has been widely proposed that PEVs can provide valuable grid services, such as load shifting to provide voltage regulation. The objective this work is to address the degree to which PEVs can provide grid services and mutually benefit the electric utilities, PEV owners, and auto manufacturers.

  15. Evaluation of conventional electric power generating industry quality assurance and reliability practices

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.T.; Lauffenburger, H.A.

    1981-03-01

    The techniques and practices utilized in an allied industry (electric power generation) that might serve as a baseline for formulating Quality Assurance and Reliability (QA and R) procedures for photovoltaic solar energy systems were studied. The study results provide direct near-term input for establishing validation methods as part of the SERI performance criteria and test standards development task.

  16. The development of the Czech Republic electric industry - Reliable, safe and responsible source mix

    Energy Technology Data Exchange (ETDEWEB)

    Vrba, Miroslav; Jez, Jiri; Ptacek, Jiri

    2010-09-15

    The paper focuses on the development of the Czech Republic electric industry in close perspective and the prediction of its expected future in period up to 2030. The goal of the paper is to specify methods and procedures applied within periodic assessment of Czech electric power sector balance outlook for the State authorities. A necessity to respect economic recession and politicization of the issue of power sector development has invoked that these items are added to commonly used procedures. A key criterion is the reliable and safe electricity supply by adequate source mix for acceptable prices and environmental aspects.

  17. The value of electricity and reserve services in low carbon electricity systems

    International Nuclear Information System (INIS)

    Vijay, Avinash; Fouquet, Nicolas; Staffell, Iain; Hawkes, Adam

    2017-01-01

    Highlights: •A power dispatch model is used to simulate electricity and reserve prices. •Good agreement is observed between modelled and historic prices in 2015. •Higher renewables and CCS with lower fossil fuels leads to lower electricity prices. •Contrary to expectation, gone green scenario leads to lowest increase in reserve price. •Flexible aggregated demand response likely to offer significant economic benefits. -- Abstract: Decarbonising electricity systems is essential for mitigating climate change. Future systems will likely incorporate higher penetrations of intermittent renewable and inflexible nuclear power. This will significantly impact on system operations, particularly the requirements for flexibility in terms of reserves and the cost of such services. This paper estimates the interrelated changes in wholesale electricity and reserve prices using two novel methods. Firstly, it simulates the short run marginal cost of generation using a unit commitment model with post-processing to achieve realistic prices. It also introduces a new reserve price model, which mimics actual operation by first calculating the day ahead schedules and then letting deviations from schedule drive reserve prices. The UK is used as a case study to compare these models with traditional methods from the literature. The model gives good agreement with and historic prices in 2015. In a 2035 scenario, increased renewables penetration reduces mean electricity prices, and leads to price spikes due to expensive plants being brought online briefly to cope with net load variations. Contrary to views previously held in literature, a renewable intensive scenario does not lead to a higher reserve price than a fossil fuel intensive scenario. Demand response technology is shown to offer sizeable economic benefits when maintaining system balance. More broadly, this framework can be used to evaluate the economics of providing reserve services by aggregating decentralised energy

  18. Outsourcing services in electricity distribution network industry; Ostopalveluiden kaeyttoe verkkoliiketoiminnassa

    Energy Technology Data Exchange (ETDEWEB)

    Aminoff, A.; Lappetelaeinen, I. (VTT Technical Research Centre of Finland, Espoo (Finland)); Partanen, J.; Viljainen, S.; Tahvanainen, K. (Lappeenranta Univ. of Technology (Finland)); Jaerventausta, P.; Trygg, P. (Tampere Univ. of Technology (Finland))

    2009-02-15

    This report examines purchased services in the electricity distribution industry. The report is specially directed to readers working in the industry or otherwise interested in it. This report is a result of a research study that was done in 2008 by VTT, Lappeenranta University of Technology and Tampere University of Technology. The authors are thankful for funders and companies that made this research possible and provided lot of information and knowledge. We appreciate the participants in the steering group as well as the companies and people who answered to questionnaires, gave interviews and took part in GDSSinnovation session. In the business of electricity distribution the usage of purchased services has been increasing during the past years and network companies have focused more on their core business processes. There are a couple of peaks in the number of new purchasing decisions in the middle of the 90s and in the beginning of 2000. The most popular purchased services are network construction and maintenance services. On the other hand, many network planning related activities are still done in-house by the network companies, and are considered their core business. There are some industry specific factors that affect to the decision on whether or not to buy the service outside the company and how to cooperate with the suppliers. For instance, many network companies are owned by municipalities and many service providers are owned by the network companies. The former issue may sometimes bring local politics into the decision-making of the network companies. The latter issue, in turn, has an impact on the relationship between the customer and the supplier, and the infra-organizational issues may sometimes complicate the service purchasing process. Electricity network companies also have natural monopoly positions in their operating areas. To prevent the abuse of monopoly positions, the network companies are subjected to economic regulation. This affects

  19. THE ANALYSIS OF STRUCTURAL RELIABILITY OF THE MAIN ELECTRIC CONNECTION CIRCUITS OF NUCLEAR POWER PLANTS

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2017-01-01

    Full Text Available The reliability of the main circuit of electrical connections at a nuclear electric power plant that has two units with a capacity of 1,200 MW each has been determined. Reliability, economical, maneuverable properties of the atomic power plant under study are largely determined by its main circuit, so the choice of the circuit for the design and its status in the process of operation occur to be critical objectives. Main electrical connection circuits in nuclear electric power plants are selected on the basis of the schematic networks of the energy system and the land attached to the plant. The circuit of the connection of a nuclear power plant to the grid in the original normal operating modes at all stages of the construction of such a plant should provide the outcome of the full added capacity of a nuclear power plant and the preservation of its stability in the power system without the influence of the emergency system automatics when any outgoing transmission line is disabled. When selecting the main circuit the individual capacity of the installed units and their number are taken into account as well as the order of development of the plant and power supply system; the voltage on which the power of a plant is delivered; a shortcircuit current for switchgear high voltage and the need for their limitation by circuit means; the most power that can be lost when damage to any switch. A model of reliability of the main circuit of electrical connections is designed to detect all types of accidents that are possible at the coincidence of failures of elements with the repair and operational modes that differs in composition and damageability of the equipment, as well as under conditions of the development of accidents due to failure of operation of devices of relay protection and automation.

  20. Electric vehicle utilization for ancillary grid services

    Science.gov (United States)

    Aziz, Muhammad

    2018-02-01

    Electric vehicle has been developed through several decades as transportation mean, without paying sufficient attention of its utilization for other purposes. Recently, the utilization of electric vehicle to support the grid electricity has been proposed and studied intensively. This utilization covers several possible services including electricity storage, spinning reserve, frequency and voltage regulation, and emergency energy supply. This study focuses on theoretical and experimental analysis of utilization of electric vehicles and their used batteries to support a small-scale energy management system. Charging rate of electric vehicle under different ambient temperature (seasonal condition) is initially analyzed to measure the correlation of charging rate, charging time, and state-of-charge. It is confirmed that charging under warmer condition (such as in summer or warmer region) shows higher charging rate than one in colder condition, therefore, shorter charging time can be achieved. In addition, in the demonstration test, each five electric vehicles and used batteries from the same electric vehicles are employed and controlled to support the electricity of the office building. The performance of the system is evaluated throughout a year to measure the load leveling effect during peak-load time. The results show that the targeted peak-load can be shaved well under certain calculated peak-shaving threshold. The finding confirms that the utilization of electric vehicle for supporting the electricity of grid or certain energy management system is feasible and deployable in the future.

  1. Reliability Evaluation of Service-Oriented Architecture Systems Considering Fault-Tolerance Designs

    Directory of Open Access Journals (Sweden)

    Kuan-Li Peng

    2014-01-01

    strategies. Sensitivity analysis of SOA at both coarse and fine grain levels is also studied, which can be used to efficiently identify the critical parts within the system. Two SOA system scenarios based on real industrial practices are studied. Experimental results show that the proposed SOA model can be used to accurately depict the behavior of SOA systems. Additionally, a sensitivity analysis that quantizes the effects of system structure as well as fault tolerance on the overall reliability is also studied. On the whole, the proposed reliability modeling and analysis framework may help the SOA system service provider to evaluate the overall system reliability effectively and also make smarter improvement plans by focusing resources on enhancing reliability-sensitive parts within the system.

  2. A physical review on power system reliability factors

    International Nuclear Information System (INIS)

    Navid, Taghizadegan; Ahmad Reza, Zentabchi; Mohammad Ali, Tavakoli; Nader, Samsunchi; Mohammad Ali, Tavakoli

    2005-01-01

    Full text : Planning and design engineers and management must necessarily take into consideration the funds available, the requirements of regulatory agencies and other restrictions that may be imposed, as well as availability of equipment and supplies. A well-designed electrical power system strikes a reasonable between reliability and cost. A prime responsibility of power system operators is to operate their systems in such a way that will provide the maximum reliability of service possible with the facilities under their control

  3. Automated Energy Distribution and Reliability System (AEDR): Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Buche, D. L.

    2008-07-01

    This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects.

  4. Short- and long-run elasticities of electricity demand in the Korean service sector

    International Nuclear Information System (INIS)

    Lim, Kyoung-Min; Lim, Seul-Ye; Yoo, Seung-Hoon

    2014-01-01

    This paper attempts to examine the electricity demand function in the Korean service sector using the annual data covering the period 1970–2011. The short- and long-run elasticities of electricity demand with respect to price and income are empirically estimated using a co-integration and error-correction model. The short- and long-run price elasticities are estimated to be −0.421 and −1.002, respectively. The short- and long-run income elasticities are computed to be 0.855 and 1.090, respectively. Electricity demand in the service sector is inelastic to changes in both price and income in the short-run, but elastic in the long-run. Therefore, it appears that a pricing policy is more effective than the direct regulation of reducing electricity demand in the long-run in order to stabilize the electricity demand in the service sector. Moreover, it is necessary to encourage a more efficient use of electricity to cope with increasing demand for electricity following economic growth because the electricity demand in the service sector is income-elastic in the long-run. - Highlights: • We examine the electricity demand function in the Korean service sector. • We use the annual data covering the period 1970–2011. • The demand function is estimated using a co-integration and error-correction model. • The short- and long-run price elasticities are −0.421 and −1.002, respectively. • The short- and long-run income elasticities are 0.855 and 1.090, respectively

  5. Dynamic Self-Adaptive Reliability Control for Electric-Hydraulic Systems

    Directory of Open Access Journals (Sweden)

    Yi Wan

    2015-02-01

    Full Text Available The high-speed electric-hydraulic proportional control is a new development of the hydraulic control technique with high reliability, low cost, efficient energy, and easy maintenance; it is widely used in industrial manufacturing and production. However, there are still some unresolved challenges, the most notable being the requirements of high stability and real-time by the classical control algorithm due to its high nonlinear characteristics. We propose a dynamic self-adaptive mixed control method based on the least squares support vector machine (LSSVM and the genetic algorithm for high-speed electric-hydraulic proportional control systems in this paper; LSSVM is used to identify and adjust online a nonlinear electric-hydraulic proportional system, and the genetic algorithm is used to optimize the control law of the controlled system and dynamic self-adaptive internal model control and predictive control are implemented by using the mixed intelligent method. The internal model and the inverse control model are online adjusted together. At the same time, a time-dependent Hankel matrix is constructed based on sample data; thus finite dimensional solution can be optimized on finite dimensional space. The results of simulation experiments show that the dynamic characteristics are greatly improved by the mixed intelligent control strategy, and good tracking and high stability are met in condition of high frequency response.

  6. Information report on challenges and perspectives of the contribution for the electricity public service

    International Nuclear Information System (INIS)

    2010-01-01

    As the law defines the missions of the electricity public service in terms of development of electricity supply, development and exploitation of electricity transport and distribution public networks, this report recalls that these missions cannot be financed only by the commercial activity of the providers. Therefore, a contribution to the electricity public service (CSPE, contribution au service public de l'electricite) has been introduced. The authors present the CSPE regime by detailing what is compensated or not by this CSPE. Then, they outline the problems faced by the CSPE such as public service costs increasing at a higher rate than the CSPE product. They show that this situation is to the detriment of EDF, and is also due the obligation for EDF to buy electricity produced from renewable sources, and at a higher price than the electricity market price, notably in the case of photovoltaic-based electricity. In the last part, the authors make some propositions to correct these problems, either by reducing the cost of the electricity produced from renewable sources, or by increasing the CSPE

  7. Reliability analysis of structures under periodic proof tests in service

    Science.gov (United States)

    Yang, J.-N.

    1976-01-01

    A reliability analysis of structures subjected to random service loads and periodic proof tests treats gust loads and maneuver loads as random processes. Crack initiation, crack propagation, and strength degradation are treated as the fatigue process. The time to fatigue crack initiation and ultimate strength are random variables. Residual strength decreases during crack propagation, so that failure rate increases with time. When a structure fails under periodic proof testing, a new structure is built and proof-tested. The probability of structural failure in service is derived from treatment of all the random variables, strength degradations, service loads, proof tests, and the renewal of failed structures. Some numerical examples are worked out.

  8. Verification criteria on the reliability of personal dosimetric services from x and gamma radiations

    International Nuclear Information System (INIS)

    Borasi, G.; Benco, A.; Kaftal, S.

    1990-07-01

    The paper presents the methods used by Working Group ENEA-EDP (Experts in Personal Dosimetry) to control the reliability of the Dosimetric Services operating in Italy and asking for the above controls on voluntary basis. Testing and irradiation test methods are explained as well as the evaluation criteria. The paper includes suggestions and guide-lines to gain the status of 'Reliable Service'. Technical equipment and operating procedures needed to pass the test are also illustrated. (author)

  9. Harmonizing electricity markets with physics : real time performance monitoring using grid-3PTM

    International Nuclear Information System (INIS)

    Budhraja, V.S.

    2003-01-01

    The Electric Power Group, LLC provides management and strategic consulting services for the electric power industry, with special emphasis on industry restructuring, competitive electricity markets, grid operations and reliability, power technologies, venture investments and start-ups. The Consortium for Electric Reliability Technology Solutions involves national laboratories, universities, and industry partners in researching, developing, and commercializing electric reliability technology solutions to protect and enhance the reliability of the American electric power system under the emerging competitive electricity market structure. Physics differentiate electric markets from other markets: there is real-time balancing, no storage, interconnected network, and power flows governed by physics. Some issues affecting both grid reliability and market issues are difficult to separate, such as security and congestion management, voltage management, reserves, frequency volatility, and others. The author examined the following investment challenges facing the electricity market: grid solutions, market solutions, and technology solutions. The real time performance monitoring and prediction platform, grid-3P was described and applications discussed, such as ACE-frequency monitoring, performance monitoring for automatic generation control (AGC) and frequency response, voltage/VAR monitoring, stability monitoring using phasor technology, and market monitoring. figs

  10. Vehicle to Grid regulation services of electric delivery trucks: Economic and environmental benefit analysis

    International Nuclear Information System (INIS)

    Zhao, Yang; Noori, Mehdi; Tatari, Omer

    2016-01-01

    Highlights: • Potential net present revenues of electric truck based V2G regulation services are investigated. • GHG emission mitigation of V2G regulation services provided by electric trucks are quantified. • The total cost of ownership and the life-cycle GHG emissions of electric trucks are also analyzed. • V2G regulation services for electric trucks could yield considerable revenues and GHG emission savings. - Abstract: Concerns regarding the fuel costs and climate change impacts associated with petroleum combustion are among the main driving factors for the adoption of electric vehicles. Future commercial delivery truck fleets may include Battery Electric Vehicles (BEVs) and Extended Range Electric Vehicles (EREVs); in addition to savings on fuel and maintenance costs, the introduction of these grid accessible electric vehicles will also provide fleet owners with possible Vehicle to Grid (V2G) opportunities. This study investigates the potential net present revenues and greenhouse gas (GHG) emission mitigation of V2G regulation services provided by electric trucks in a typical fleet. The total cost of ownership and the life-cycle GHG emissions of electric trucks are also analyzed and compared to those of traditional diesel trucks. To account for uncertainties, possible ranges for key parameters are considered instead of only considering fixed single data values for each parameter. The results of this research indicate that providing V2G regulation services for electric trucks could yield considerable additional revenues ($20,000–50,000) and significant GHG emission savings (approximately 300 ton CO_2) compared to conventional diesel trucks.

  11. Automation of steam generator services at public service electric & gas

    Energy Technology Data Exchange (ETDEWEB)

    Cruickshank, H.; Wray, J.; Scull, D. [Public Service Electric & Gas, Hancock`s Bridge, NJ (United States)

    1995-03-01

    Public Service Electric & Gas takes an aggressive approach to pursuing new exposure reduction techniques. Evaluation of historic outage exposure shows that over the last eight refueling outages, primary steam generator work has averaged sixty-six (66) person-rem, or, approximately tewenty-five percent (25%) of the general outage exposure at Salem Station. This maintenance evolution represents the largest percentage of exposure for any single activity. Because of this, primary steam generator work represents an excellent opportunity for the development of significant exposure reduction techniques. A study of primary steam generator maintenance activities demonstrated that seventy-five percent (75%) of radiation exposure was due to work activities of the primary steam generator platform, and that development of automated methods for performing these activities was worth pursuing. Existing robotics systems were examined and it was found that a new approach would have to be developed. This resulted in a joint research and development project between Westinghouse and Public Service Electric & Gas to develop an automated system of accomplishing the Health Physics functions on the primary steam generator platform. R.O.M.M.R.S. (Remotely Operated Managed Maintenance Robotics System) was the result of this venture.

  12. STRUCTURAL FLUCTUATIONS, ELECTRICAL RESPONSE AND THE RELIABILITY OF NANOSTRUCTURES (FINAL REPORT)

    Energy Technology Data Exchange (ETDEWEB)

    Philip J. Rous; Ellen D. Williams; Michael S. Fuhrer

    2006-07-31

    The goal of the research supported by DOE-FG02-01ER45939 was to synthesize a number of experimental and theoretical approaches to understand the relationship between morphological fluctuations, the electrical response and the reliability (failure) of metallic nanostructures. The primary focus of our work was the study of metallic nanowires which we regard as prototypical of nanoscale interconnects. Our research plan has been to link together these materials properties and behaviors by understanding the phenomenon of, and the effects of electromigration at nanometer length scales. The thrust of our research has been founded on the concept that, for nanostructures where the surface-to-volume ratio is necessarily high, surface diffusion is the dominant mass transport mechanism that governs the fluctuations, electrical properties and failure modes of nanostructures. Our approach has been to develop experimental methods that permit the direct imaging of the electromagnetic distributions within nanostructures, their structural fluctuations and their electrical response. This experimental research is complemented by a parallel theoretical and computational program that describes the temporal evolution of nanostructures in response to current flow.

  13. 77 FR 31342 - Application To Export Electric Energy; Emera Energy Services Subsidiaries

    Science.gov (United States)

    2012-05-25

    ...] Application To Export Electric Energy; Emera Energy Services Subsidiaries AGENCY: Office of Electricity... EA-325, authorizing the Emera Subsidiaries to transmit electric energy from the United States to... date listed above. Comments on the Emera applications to export electric energy to Canada should be...

  14. Strategic bidding of generating units in competitive electricity market with considering their reliability

    International Nuclear Information System (INIS)

    Soleymani, S.; Ranjbar, A.M.; Shirani, A.R.

    2008-01-01

    In the restructured power systems, they are typically scheduled based on the offers and bids to buy and sell energy and ancillary services (AS) subject to operational and security constraints. Generally, no account is taken of unit reliability when scheduling it. Therefore generating units have no incentive to improve their reliability. This paper proposes a new method to obtain the equilibrium points for reliability and price bidding strategy of units when the unit reliability is considered in the scheduling problem. The proposed methodology employs the supply function equilibrium (SFE) for modeling a unit's bidding strategy. Units change their bidding strategies and improve their reliability until Nash equilibrium points are obtained. GAMS (general algebraic modeling system) language has been used to solve the market scheduling problem using DICOPT optimization software with mixed integer non-linear programming. (author)

  15. Development of services on the electricity market in the USA

    International Nuclear Information System (INIS)

    Augustsson, Kamilla

    1997-10-01

    American electric utilities are developing new services and creating strategic alliances in order to be competitive on a de-regulated market. Separate energy-service companies are created, which offer many services: energy brokers, energy auditing, out-sourcing of energy supply, control of energy bills and information- and communication-services. The report describes how the utilities prepare for the deregulation and what type of services are offered to commercial and industry customers 21 refs, 10 figs

  16. Resolution 29/003. It approve the Regulation of quality electricity distribution service with annexes

    International Nuclear Information System (INIS)

    2004-01-01

    This decree approve the Regulation of quality electricity distribution service. It establishes that the public electricity service should be provided with an appropriate level of quality for the users

  17. Reliability-based service life assessment of concrete structures in nuclear power plants: optimum inspection and repair

    International Nuclear Information System (INIS)

    Ellingwood, B.R.; Mori, Y.

    1995-01-01

    Research is being conducted to address aging management of safety-related reinforced concrete structures in nuclear power plants (NPPs). Documentation is being prepared to identify potential structural safety issues and to recommend criteria for use in evaluating reinforced concrete structures for continued service. Time-dependent reliability analysis provides the framework and quantitative tools for the condition assessment. The role of in-service inspection and repair in ensuring continued reliability in-service is examined. (author). 19 refs., 4 figs

  18. Transmission embedded cost allocation methodology with consideration of system reliability

    International Nuclear Information System (INIS)

    Hur, D.; Park, J.-K.; Yoo, C.-I.; Kim, B.H.

    2004-01-01

    In a vertically integrated utility industry, the cost of reliability, as a separate service, has not received much rigorous analysis. However, as a cornerstone of restructuring the industry, the transmission service pricing must change to be consistent with, and supportive of, competitive wholesale electricity markets. This paper focuses on the equitable allocation of transmission network embedded costs including the transmission reliability cost based on the contributions of each generator to branch flows under normal conditions as well as the line outage impact factor under a variety of load levels. A numerical example on a six-bus system is given to illustrate the applications of the proposed methodology. (author)

  19. Evaluation and improvement in nondestructive examination (NDE) reliability for in-service inspection of light water reactors

    International Nuclear Information System (INIS)

    Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.

    1988-01-01

    The evaluation and improvement of NDE Reliability for In-service Inspection (ISI) of Light Water Reactors (NDE Reliability) Program at Pacific Northwest Laboratory (PNL) was established to determine the reliability of current ISI techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this NRC program are to: determine the reliability of ultrasonic ISI performed on commercial light-water reactor (LWR) primary systems; determine the impact of NDE unreliability on system safety and determine the level of inspection reliability required to ensure a suitably low failure probability using probabilistic fracture mechanics analysis; evaluate the degree of reliability improvement that could be achieved using improved and advanced NDE technique; and recommend revisions to ASME Code, Section XI, and Regulatory Requirements, based on material properties, service conditions, and NDE uncertainties, that will ensure suitably low failure probabilities. The program consists of three basic tasks: a Piping task, a Pressure Vessel task, and an Evaluation and Improvement in NDE Reliability task. The major efforts were concentrated in the Piping task and the Evaluation and Improvement in NDE Reliability task

  20. Research on service strategy of electricity selling company under the reform of electricity market

    Science.gov (United States)

    Long, Zhuhan; Meng, Shiyu; Dou, Jinyue; Zeng, Ming; Sun, Chenjun

    2017-10-01

    The opening of the sale side of electricity market is an important goal of the new round of power system reform in China, and it is necessary to speed up the establishment and development of the electricity selling companies to achieve this goal. First of all, this paper defines the key problems, which are needed to be solved in the establishment of the sale side market, such as demand side response, optimization of users' power consumption mode, profit mode of electricity selling companies and fair competition in the market. On this basis, this paper analyzes the business of electricity selling company, from the aspects of the transition of business ideas, improving the energy efficiency level, providing integrated energy solutions and innovating business management mode; and then, the service strategies of electricity selling companies are put forward.

  1. How reliably can climate change and mitigation policy impacts on electric utilities be assessed?

    International Nuclear Information System (INIS)

    Dowlatabadi, H.; Kopp, R.J.; Palmer, K.; De Witt, D.

    1993-01-01

    Numerous mechanisms link climate change and electric utilities. Electricity generation releases radiatively active trace substances (RATS). Significant changes in atmospheric concentration of RATS can lead to a change in regional and global climate regimes. Mitigation action designed to prevent or limit climate change is possible through curbing emissions. Climate change and related mitigation actions impact on electric utilities. Foresight in electric utility planning requires reliable predictions of how the utilities may be affected in the decades ahead. In this paper the impacts of climate change and mitigation policies are noted, and our ability to assess these is reviewed. To this end a suite of models exploring supply and demand questions have been developed. The overall conclusion of the study is that the demand-side uncertainties dominate other unknowns and need to be better characterized and understood. (author)

  2. 48 CFR 52.241-1 - Electric Service Territory Compliance Representation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Electric Service Territory Compliance Representation. 52.241-1 Section 52.241-1 Federal Acquisition Regulations System FEDERAL... utility franchises or service territories established pursuant to State statute, State regulation, or...

  3. Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated {open_quotes}cost-of-service{close_quotes} pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices.

  4. The Challenge Posed by Geomagnetic Activity to Electric Power Reliability: Evidence From England and Wales

    Science.gov (United States)

    Forbes, Kevin F.; St. Cyr, O. C.

    2017-10-01

    This paper addresses whether geomagnetic activity challenged the reliability of the electric power system during part of the declining phase of solar cycle 23. Operations by National Grid in England and Wales are examined over the period of 11 March 2003 through 31 March 2005. This paper examines the relationship between measures of geomagnetic activity and a metric of challenged electric power reliability known as the net imbalance volume (NIV). Measured in megawatt hours, NIV represents the sum of all energy deployments initiated by the system operator to balance the electric power system. The relationship between geomagnetic activity and NIV is assessed using a multivariate econometric model. The model was estimated using half-hour settlement data over the period of 11 March 2003 through 31 December 2004. The results indicate that geomagnetic activity had a demonstrable effect on NIV over the sample period. Based on the parameter estimates, out-of-sample predictions of NIV were generated for each half hour over the period of 1 January to 31 March 2005. Consistent with the existence of a causal relationship between geomagnetic activity and the electricity market imbalance, the root-mean-square error of the out-of-sample predictions of NIV is smaller; that is, the predictions are more accurate, when the statistically significant estimated effects of geomagnetic activity are included as drivers in the predictions.

  5. Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market

    International Nuclear Information System (INIS)

    Hemmati, Reza; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin

    2013-01-01

    Highlights: • Generation expansion planning is presented in deregulated electricity market. • Wind farm uncertainty is modeled in the problem. • The profit of each GENCO is maximized and also the safe operation of system is satisfied. • Salve sector is managed as an optimization programming and solved by using PSO technique. • Master sector is considered in pool market and Cournot model is used to simulate it. - Abstract: This paper addresses reliability constrained generation expansion planning (GEP) in the presence of wind farm uncertainty in deregulated electricity market. The proposed GEP aims at maximizing the expected profit of all generation companies (GENCOs), while considering security and reliability constraints such as reserve margin and loss of load expectation (LOLE). Wind farm uncertainty is also considered in the planning and GENCOs denote their planning in the presence of wind farm uncertainty. The uncertainty is modeled by probability distribution function (PDF) and Monte-Carlo simulation (MCS) is used to insert uncertainty into the problem. The proposed GEP is a constrained, nonlinear, mixed-integer optimization programming and solved by using particle swarm optimization (PSO) method. In this paper, Electricity market structure is modeled as a pool market. Simulation results verify the effectiveness and validity of the proposed planning for maximizing GENCOs profit in the presence of wind farms uncertainties in electricity market

  6. 77 FR 41184 - Coordination Between Natural Gas and Electricity Markets; Notice of Technical Conferences

    Science.gov (United States)

    2012-07-12

    ... Operator Inc. (MISO), Southwest Power Pool, Inc. (SPP) and Electric Reliability Council of Texas (ERCOT). While we recognize we do not have Federal Power Act jurisdiction over the rates or terms of service in...-electric interdependence. The commenters raised a wide variety of issues regarding gas-electric...

  7. Nuclear electric propulsion operational reliability and crew safety study

    International Nuclear Information System (INIS)

    Karns, J.J.; Fragola, J.R.; Kahan, L.; Pelaccio, D.

    1993-01-01

    The central purpose of this analysis is to assess the ''achievability'' of a nuclear electric propulsion (NEP) system in a given mission. ''Achievability'' is a concept introduced to indicate the extent to which a system that meets or achieves its design goals might be implemented using the existing technology base. In the context of this analysis, the objective is to assess the achievability of an NEP system for a manned Mars mission as it pertains to operational reliability and crew safety goals. By varying design parameters, then examining the resulting system achievability, the design and mission risk drivers can be identified. Additionally, conceptual changes in design approach or mission strategy which are likely to improve overall achievability of the NEP system can be examined

  8. Electricity consumption and ICT in the French service sector

    Energy Technology Data Exchange (ETDEWEB)

    Collard, Fabrice [Toulouse Univ., (GREMAQ-CNRS, IDEI), Toulouse (France); Feve, Patrick [GREMAQ-Univ. de Toulouse 1, Toulouse, 31 (France); Portier, Franck [Toulouse Univ., (GREMAQ, LEERNA, IDEI, IUF, CEPR), Toulouse (France)

    2005-05-01

    The paper documents the evolution of electricity use and the development of information and communication (IC) technologies in the French service sector. To that purpose, we put together two data sets documenting electricity consumption and the diffusion of IC capital goods. Using a simple factor demand model, we estimate the structural parameters of the model using both the time series and the cross-sectional dimension of the data, and allow for a specific effect of IC capital goods on the efficiency of electricity in production. We obtain robust results showing that, once controlled for technical progress, prices, and heated areas, electricity intensity of production increases with computers and software, while it decreases with the diffusion of communication device. (Author)

  9. Impacts of Natural Disasters on Swedish Electric Power Policy: A Case Study

    Directory of Open Access Journals (Sweden)

    Niyazi Gündüz

    2017-02-01

    Full Text Available The future of climate and sustainable energy are interrelated. Speaking of one without mentioning the other is quite difficult. The increasing number of natural disasters pose a great threat to the electric power supply security in any part of the world. Sweden has been one of the countries that have suffered from unacceptably long blackouts. The tremendous outcomes of the power interruptions have made the field of the economic worth of electric power reliability a popular area of interest among researchers. Nature has been the number one enemy against the supply security of the electricity. This paper introduces a recent and thorough electric power reliability analysis of Sweden and focuses on the country’s struggle against climate change-related natural disasters via updating the country’s electric power policy to improve its service quality. The paper highlights the Gudrun storm of 2005 as a case study to demonstrate the severe impacts of extreme weather events on the energy systems. The economic damage of the storm on the electric power service calculated to be around 3 billion euros.

  10. Reliability of buildings in service limit state for maximum horizontal displacements

    Directory of Open Access Journals (Sweden)

    A. G. B. Corelhano

    Full Text Available Brazilian design code ABNT NBR6118:2003 - Design of Concrete Structures - Procedures - [1] proposes the use of simplified models for the consideration of non-linear material behavior in the evaluation of horizontal displacements in buildings. These models penalize stiffness of columns and beams, representing the effects of concrete cracking and avoiding costly physical non-linear analyses. The objectives of the present paper are to investigate the accuracy and uncertainty of these simplified models, as well as to evaluate the reliabilities of structures designed following ABNT NBR6118:2003[1&] in the service limit state for horizontal displacements. Model error statistics are obtained from 42 representative plane frames. The reliabilities of three typical (4, 8 and 12 floor buildings are evaluated, using the simplified models and a rigorous, physical and geometrical non-linear analysis. Results show that the 70/70 (column/beam stiffness reduction model is more accurate and less conservative than the 80/40 model. Results also show that ABNT NBR6118:2003 [1] design criteria for horizontal displacement limit states (masonry damage according to ACI 435.3R-68(1984 [10] are conservative, and result in reliability indexes which are larger than those recommended in EUROCODE [2] for irreversible service limit states.

  11. Reliability and service life of wood structures and buildings

    OpenAIRE

    Zdeňka Havířová; Pavel Kubů

    2005-01-01

    Service life of constructions and buildings of wood is dependent on temperature and moisture conditions in layers of the building cladding where the wood framework is built in. Temperature/moisture conditions or the corresponding equilibrium moisture content (EMC) of the construction show considerable effects on the functional reliability of the whole building from the viewpoint of mechanical resistance and stability (ER1), energy savings and thermal protection (ER6) and hygiene, health and e...

  12. Beliefs concerning the reliability of nuclear power plant in-service inspections

    International Nuclear Information System (INIS)

    Kettunen, J.

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials' beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees' own justification. (refs.)

  13. Beyond sustainable transport. Electric car features and services

    Energy Technology Data Exchange (ETDEWEB)

    Malinen, P.; Pirhonen, V.; Giesecke, R. [Aalto Univ. School of Science, Espoo (Finland). BIT Research Centre

    2011-07-01

    The overall aim of the Finnish SIMBe project (www.SIMBe.fi) is to significantly accelerate the introduction of sustainable electric mobility in Finland. SIMBe stands for Smart Infrastructures for Electric Mobility in Built Environments. The fundamental assumption of the project is that electric (e-) mobility is inherently more sustainable than mobility based on fossil fuels. However, as has been widely recognized in the e-mobility field, the currently used batteries are expensive, often more expensive than the rest of the particular electric vehicle (EV) that they propel. There are two opposite schools of thought how to address this problem, which can be summarized as follows: a) Leave the battery in peace, as it is precious. Use it only to propel the EV of which it is an integral part. Use it instead of fuel, and do not use it for any other applications. The EV's sole purpose is that of a transportation device. b) Make as much use of the battery as possible, as it is precious. Involve vehicle to grid (V2G) or vehicle to house charging. Additionally, invent new features, meanings and services for the battery driven EV, which go distinctively beyond transport. The SIMBe project decided to opt for school (b), based on the smart energy production and distribution scenario, in which electric and hybrid vehicles' batteries will deliver energy on demand to the grid. SIMBe aims to prepare key Finnish industrial players and consumers for the transition to this new energy-transportation paradigm. But how can we replace the conservative understanding of the 'transport only' school by a holistic view of what features, meanings and services are actually possible by using a large scale fleet of 'batteries on wheels'? The Nordic Climate Festival (at) Aalto provided the unique opportunity to tap into the knowledge and creativity of students within the Nordic countries. Being properly prepared and facilitated, a workshop may provide some insights and

  14. Beyond sustainable transport. Electric car features and services

    Energy Technology Data Exchange (ETDEWEB)

    Malinen, P; Pirhonen, V; Giesecke, R [Aalto Univ. School of Science, Espoo (Finland). BIT Research Centre

    2011-07-01

    The overall aim of the Finnish SIMBe project (www.SIMBe.fi) is to significantly accelerate the introduction of sustainable electric mobility in Finland. SIMBe stands for Smart Infrastructures for Electric Mobility in Built Environments. The fundamental assumption of the project is that electric (e-) mobility is inherently more sustainable than mobility based on fossil fuels. However, as has been widely recognized in the e-mobility field, the currently used batteries are expensive, often more expensive than the rest of the particular electric vehicle (EV) that they propel. There are two opposite schools of thought how to address this problem, which can be summarized as follows: a) Leave the battery in peace, as it is precious. Use it only to propel the EV of which it is an integral part. Use it instead of fuel, and do not use it for any other applications. The EV's sole purpose is that of a transportation device. b) Make as much use of the battery as possible, as it is precious. Involve vehicle to grid (V2G) or vehicle to house charging. Additionally, invent new features, meanings and services for the battery driven EV, which go distinctively beyond transport. The SIMBe project decided to opt for school (b), based on the smart energy production and distribution scenario, in which electric and hybrid vehicles' batteries will deliver energy on demand to the grid. SIMBe aims to prepare key Finnish industrial players and consumers for the transition to this new energy-transportation paradigm. But how can we replace the conservative understanding of the 'transport only' school by a holistic view of what features, meanings and services are actually possible by using a large scale fleet of 'batteries on wheels'? The Nordic Climate Festival (at) Aalto provided the unique opportunity to tap into the knowledge and creativity of students within the Nordic countries. Being properly prepared and facilitated, a workshop may provide some insights and ideas. In scope of the

  15. Developing a viable electric bus service: the Milton Keynes demonstration project

    OpenAIRE

    Miles, John; Potter, Stephen

    2014-01-01

    Buses can be a serious source of city centre air pollution. Electric buses deliver zero emissions but, because of the time required to recharge, more buses are needed for a given timetable than diesel counterparts, so making mainstream electric bus operations prohibitively expensive.\\ud \\ud Early 2014 saw the implementation in Milton Keynes of an electric bus service designed to overcome this problem. An entire bus route has been converted to electric operation with inductive charging at bus ...

  16. Modeling Message Queueing Services with Reliability Guarantee in Cloud Computing Environment Using Colored Petri Nets

    Directory of Open Access Journals (Sweden)

    Jing Li

    2015-01-01

    Full Text Available Motivated by the need for loosely coupled and asynchronous dissemination of information, message queues are widely used in large-scale application areas. With the advent of virtualization technology, cloud-based message queueing services (CMQSs with distributed computing and storage are widely adopted to improve availability, scalability, and reliability; however, a critical issue is its performance and the quality of service (QoS. While numerous approaches evaluating system performance are available, there is no modeling approach for estimating and analyzing the performance of CMQSs. In this paper, we employ both the analytical and simulation modeling to address the performance of CMQSs with reliability guarantee. We present a visibility-based modeling approach (VMA for simulation model using colored Petri nets (CPN. Our model incorporates the important features of message queueing services in the cloud such as replication, message consistency, resource virtualization, and especially the mechanism named visibility timeout which is adopted in the services to guarantee system reliability. Finally, we evaluate our model through different experiments under varied scenarios to obtain important performance metrics such as total message delivery time, waiting number, and components utilization. Our results reveal considerable insights into resource scheduling and system configuration for service providers to estimate and gain performance optimization.

  17. Reliable electricity. The effects of system integration and cooperative measures to make it work

    Energy Technology Data Exchange (ETDEWEB)

    Hagspiel, Simeon [Koeln Univ. (Germany). Energiewirtschaftliches Inst.; Koeln Univ. (Germany). Dept. of Economics

    2017-12-15

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  18. Reliable electricity. The effects of system integration and cooperative measures to make it work

    International Nuclear Information System (INIS)

    Hagspiel, Simeon; Koeln Univ.

    2017-01-01

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  19. Utility service quality - telecommincations, electricity, water

    Energy Technology Data Exchange (ETDEWEB)

    Holt, L. [Florida Univ., Gainesville, FL (United States). Public Utility Research Center

    2005-09-01

    This survey of quality-of-service issues raised by regulation identifies 12 steps for promoting efficient sector performance. First, regulators must identify objectives and prioritize them. Inter-agency coordination is often required to establish targets. Regulators must also determine a process for selecting measures and an appropriate method for evaluating them. Finally, performance incentives must be established and outcomes periodically reviewed. Telecommunications, electricity, and water all have multiple dimensions of quality that warrant careful attention. (Author)

  20. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Science.gov (United States)

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  1. Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Rick Meeker; L. Baldwin; Steinar Dale; Alexander Domijan; Davild Larbalestier; Hui Li; Peter McLaren; Sastry Pamidi; Horatio Rodrigo; Michael Steurer

    2010-03-31

    Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and

  2. Electricity prices in a competitive environment: Marginal cost pricing of generation services and financial status of electric utilities. A preliminary analysis through 2015

    International Nuclear Information System (INIS)

    1997-08-01

    The emergence of competitive markets for electricity generation services is changing the way that electricity is and will be priced in the United States. This report presents the results of an analysis that focuses on two questions: (1) How are prices for competitive generation services likely to differ from regulated prices if competitive prices are based on marginal costs rather than regulated open-quotes cost-of-serviceclose quotes pricing? (2) What impacts will the competitive pricing of generation services (based on marginal costs) have on electricity consumption patterns, production costs, and the financial integrity patterns, production costs, and the financial integrity of electricity suppliers? This study is not intended to be a cost-benefit analysis of wholesale or retail competition, nor does this report include an analysis of the macroeconomic impacts of competitive electricity prices

  3. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Science.gov (United States)

    2011-04-28

    ... have an operating plan and facilities for backup functionality to ensure Bulk-Power System reliability... entity's primary control center on the reliability of the Bulk-Power System. \\1\\ Mandatory Reliability... potential impact of a violation of the Requirement on the reliability of the Bulk-Power System. The...

  4. Impact of nuclear fuel performance and reliability in a deregulated electricity market

    International Nuclear Information System (INIS)

    Barnoski, M.; Kaiser, B.

    1997-01-01

    US nuclear plants are now placing a great deal of importance on fuel performance and reliability because of their direct effect on a plant's capacity factor, availability, operating flexibility, outage duration, and worker exposure. This is reflected by utilities making fuel reliability a principal vendor evaluation criterion and making fuel performance an important bonus/penalty provision. Defect-free fuel, combined with ever improving design features, makes it possible for plants to operate at higher outputs while reducing operating and maintenance costs. Higher electrical output at lower cost is essential for US nuclear plants to meet the expected competition in a deregulated market. Through continued investment in manufacturing improvements and a vigilant, systematic design process, ABB's nuclear fuel has contributed to helping its nuclear utility customers reduce their cost of doing business. (author) 1 fig., 1 tab

  5. Electric industry restructuring, ancillary services, and the potential impact on wind

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, B.; Hirst, E. [Oak Ridge National Lab., TN (United States); Parsons, B.; Porter, K. [National Renewable Energy Lab., Golden, CO (United States)] [and others

    1997-12-31

    The new competitive electric power environment raises increased challenges for wind power. The DOE and EPRI wind programs have dealt extensively with the traditional vertically integrated utility planning and operating environment in which the host utility owns the generation (or purchases the power) and provides dispatch and transmission services. Under this traditional environment, 1794 MW of wind power, principally in California, have been successfully integrated into the U.S. electric power system. Another 4200 MW are installed elsewhere in the world. As issues have arisen, such as intermittency and voltage regulation, they have been successfully addressed with accepted power system procedures and practices. For an intermittent, non-dispatchable resource such as wind, new regulatory rules affecting power transmission services, raise questions about which ancillary services wind plants will be able to sell, which they will be required to purchase, and what the economic impacts will be on individual wind projects. This paper begins to look at issues of concern to wind in a restructured electric industry. The paper first briefly looks at the range of unbundled services and comments on their unique significance to wind. To illustrate the concerns that arise with restructuring, the paper then takes a more detailed look at a single service: regulation. Finally, the paper takes a brief look at technologies and strategies that could improve the competitive position of wind.

  6. Quality of electric service in utility distribution networks under electromagnetic compatibility principles. [ENEL

    Energy Technology Data Exchange (ETDEWEB)

    Chizzolini, P.; Lagostena, L.; Mirra, C.; Sani, G. (ENEL, Rome Milan (Italy))

    1989-03-01

    The development of electromagnetic compatibility criteria, being worked out in international standardization activities, requires the establishment of the characteristics of public utility distribution networks as a reference ambient. This is necessary for gauging the immunity levels towards users and for defining the disturbance emission limits. Therefore, it is a new way to look at the quality of electric service. Consequently, it is necessary to check and specify, in an homogeneous manner, the phenomena that affect electric service. Use must be made of experimental tests and of the collection and elaboration of operation data. In addition to testing techniques, this paper describes the checking procedures for the quality of electric service as they are implemented in the information system developed by ENEL (Italian Electricity Board) for distribution activities. The first reference data obtained from the national and international fields about voltage shape and supply continuity are also indicated.

  7. Reliability Analysis of Differential Relay as Main Protection Transformer Using Fuzzy Logic Algorithm

    Science.gov (United States)

    Mulyadi, Y.; Sucita, T.; Sumarto; Alpani, M.

    2018-02-01

    Electricity supply demand is increasing every year. It makes PT. PLN (Persero) is required to provide optimal customer service and satisfaction. Optimal service depends on the performance of the equipment of the power system owned, especially the transformer. Power transformer is an electrical equipment that transforms electricity from high voltage to low voltage or vice versa. However, in the electrical power system, is inseparable from interference included in the transformer. But, the disturbance can be minimized by the protection system. The main protection transformer is differential relays. Differential relays working system using Kirchoff law where inflows equal outflows. If there are excessive currents that interfere then the relays will work. But, the relay can also experience decreased performance. Therefore, this final project aims to analyze the reliability of the differential relay on the transformer in three different substations. Referring to the standard applied by the transmission line protection officer, the differential relay shall have slope characteristics of 30% in the first slope and 80% in the second slope when using two slopes and 80% when using one slope with an instant time and the corresponding ratio. So, the results obtained on the Siemens differential release have a reliable slope characteristic with a value of 30 on the fuzzy logic system. In a while, ABB a differential relay is only 80% reliable because two experiments are not reliable. For the time, all the differential relays are instant with a value of 0.06 on the fuzzy logic system. For ratios, the differential relays ABB have a better value than others brand with a value of 151 on the fuzzy logic system.

  8. 2017 NREL Photovoltaic Reliability Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-08-15

    NREL's Photovoltaic (PV) Reliability Workshop (PVRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology -- both critical goals for moving PV technologies deeper into the electricity marketplace.

  9. Privatization of Electricity Service Delivery in Developing Nations: Issues and Challenges

    Directory of Open Access Journals (Sweden)

    Olamide Eniola Victor

    2015-09-01

    Full Text Available The provision of public utilities and infrastructures particularly electricity by the public sector (Government especially in the Developing Nations has been heavily criticized. This has been attributed to many reasons including poor electricity supply, poor distribution of service delivery of electricity due to the absence of spatial planning, insufficient government investment into the power industry, ineptitude operation on the part of the technicians, poor administration and managerial control. However, efforts to move away from government ownership, control or participation in this sector of economy towards free enterprise and increased inclusive private sector participation known as privatization, has been adopted as one of the solutions. This paper presents a critical review of privatization practices of alternative Service Delivery approach of selected Asian and African nations. The paper would elicit the common variants of privatization models adopted by these nations and the different implementation strategies which resulted in divergence in effectiveness and efficiency in the service delivery of electricity. The selected Asian countries are; Malaysia, India, and China, while the selected African nations are Nigeria, Cameroun and South Africa. The paper will draw from the literatures the various approaches, concepts adopted, practices, issues and challenges faced by these countries.

  10. North American Electric Reliability Council (NERC) Reliability Coordinators

    Data.gov (United States)

    Department of Homeland Security — ERC is an international regulatory authority that works to improve the reliability of the bulk power system in North America. NERC works with many different regional...

  11. Natural-gas-powered thermoelectricity as a reliability factor in the Brazilian electric sector

    International Nuclear Information System (INIS)

    Fernandes, E.; Oliveira, J.C.S. de; de Oliveira, P.R.; Alonso, P.S.R.

    2008-01-01

    The introduction of natural-gas-powered thermoelectricity into the Brazilian generation sector can be considered as a very complex energy, economic, regulatory and institutional revision. Brazil is a country with very specific characteristics in electricity generation, as approximately 80% of the generating capacity is based on hydroelectricity, showing strong dependency on rain and management of water reservoirs. A low rate of investment in the Brazilian Electricity Industry in the period of 1995-2000, associated with periods of low rainfall, led to a dramatic lowering of the water stocks in the reservoirs. With this scenario and the growing supply of natural gas, both from within Brazil and imported, natural gas thermal electric plants became a good option to diversify the electrical supply system. In spite of the Brazilian Government's efforts to install such plants, the country was faced with severe electricity rationing in 2001. The objective of this work is to show the need to continue with the implementation of natural gas thermal electricity projects, in a manner that allows flexibility and guarantees greater working reliability for the entire Brazilian electricity sector. Taking into account the world trend towards renewable energy, the perspectives of usage of biofuels in the Brazilian Energy Matrix and in electrical energy generation are also analyzed. The very issue of electrical power efficiency in Brazil and its challenges and strategic proposals from the standpoint of Government Programs and results provided so far are presented. The technological constraints in order to put on stream the thermal electric plants are also analyzed. The article concludes with a positive perspective of the usage of natural gas as to be the third pillar in the Brazilian Energy Matrix for the years to come

  12. Competing on service and branding in the renewable electricity sector

    International Nuclear Information System (INIS)

    Paladino, Angela; Pandit, Ameet P.

    2012-01-01

    Green marketing research has traditionally analysed the effect of attitudes and norms on purchase intentions and behaviours. While we are aware of research examining attitudes and behaviours towards green tangible products (e.g., ), there is no understanding regarding how these factors apply to intangible renewable power services. Similarly, branding and its effects are scant in a contemporary green marketing context. Of this research, most has evaluated the product and not service brands. Some have researched the extent of green branding and its effects on attitudes (e.g., ). Despite this, research evaluating the role of renewable electricity retailer brands and their characteristics is limited. This study works towards understanding this and seeks to bind the existing branding, services marketing and consumer behaviour literatures to understand the motivators behind renewable electricity purchase in Australia. With the introduction of contestable customers and the increase in importance of renewable energy around the world, it is imperative that renewable electricity retailers attract consumer interest and attain their consideration. Using focus group research and in-depth interviews from consumers in Australia, this paper analyses the strategic options available to the power provider to increase their appeal to the consumer. Theoretical and managerial implications are reviewed. - Highlights: ► We examine the motivations to adopt renewable electricity by Australian consumers. ► Renewable power suppliers should create a ‘living brand’ where employees are invested in the brand. ► Service interaction is a point of differentiation leading to increased competitive advantage. ► Building a sense of brand community helps build customer loyalty and the rise of green energy programs. ► Functional and emotional brand positioning appeals to consumers can be used to increase adoption.

  13. 18-month outlook : an assessment of the reliability of the Ontario Electricity System

    International Nuclear Information System (INIS)

    2005-01-01

    This paper provides an 18 month forecast of the Ontario electricity system, as well as an outline of activities and recent developments relating to the issue of reliability. An additional aim of the paper was to identify potentially adverse conditions that may require adjustment or coordination of maintenance plans for generation and transmission equipment. Requests for proposals (RFPs) for renewable generation within the specified time-frame were also discussed, as well as the return to service of Ontario Power Generation's Pickering Unit 1. Reduced reserve levels for the summer of 2005 were anticipated, and details of forecasted peak demand, generator maintenance, new generation and price-responsive demand adjustments and forced outage rates were presented. It was suggested that adequate market mechanisms were in place to manage reserve levels. Developments concerning the new Parkway Transformer station were reviewed. A resource outlook was provided. Available resources were expected to exceed planning requirements with the exception of 6 weeks in the summer of 2005. A projected capacity increase was also anticipated, due to the return of Pickering 1 and an additional 515 MW in the fall of 2005. Price-responsive demands were forecasted to exceed 650 MW due to increases in dispatchable load. It was suggested that in order to ensure power demand during peak periods, imports may be required under extreme weather conditions, combined with the possible deferral or cancellation of generation maintenance. Transmission impacts due to shutdowns were discussed. Voltage system requirements were reviewed, along with details of the installation of additional shunt capacitors and transformer controls. The electricity market was reviewed in the context of current overall economic conditions. Data forecasting normal peak demand was presented for the entire outlook period. 19 tabs., 10 figs

  14. A Survey on the Reliability of Power Electronics in Electro-Mobility Applications

    DEFF Research Database (Denmark)

    Gadalla, Brwene Salah Abdelkarim; Schaltz, Erik; Blaabjerg, Frede

    2015-01-01

    Reliability is an important issue in the field of power electronics since most of the electrical energy is today processed by power electronics. In most of the electro-mobility applications, e.g. electric and hybridelectric vehicles, power electronic are commonly used in very harsh environment...... and extending the service lifetime as well. Research within power electronics is of high interest as it has an important impact in the industry of the electro-mobility applications. According to the aforementioned explanations, this paper will provide an overview of the common factors (thermal cycles, power...... cycles, vibrations, voltage stress and current ripple stress) affecting the reliability of power electronics in electromobility applications. Also, the researchers perspective is summarized from 2001 to 2015....

  15. Role Of E-Government In Delivery Of Public Services In Tanzania Electric Supply Company In Ruvuma Region Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel Jackson Petro Gunda

    2015-06-01

    Full Text Available ABSTRACT E-government facilitates delivery of public services of relevant government information in electronic form to citizens in a timely manner and better service delivery to citizens. E-government is a kind of governmental administration which is based on Information Communication and Technology Services. Electronic government describes the use of technologies to facilitate the operation of government and disperse of government information and services. The scope of the work was limited to Tanzania Electric Supply Company Limited TANESCO in Ruvuma region. The population of thirty 31 were selected from a total population of 169 public servants use both purposive and stratified random sampling techniques applied. The major findings of study revealed that about 67.7 of response from respondents agree that ICT infrastructures specifically modern computer connected to internet reliable internet speed well organized organization website power availability in public operation contribute to efficient in delivery of services it also noted by respondents to faster decision making speeding up transaction processing and reduce cost. The study greatly recommends that capacity building to public servants on ICT install and strengthening ICT infrastructures to government organizational are inevitable to realise relevant role of e-government in delivery of public services.

  16. 77 FR 40413 - Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric...

    Science.gov (United States)

    2012-07-09

    ... Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies AGENCY: Federal... Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies, 135 FERC ] 61... Commission 18 CFR Parts 35, 37, and 101 Third-Party Provision of Ancillary Services; Accounting and Financial...

  17. 78 FR 26349 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Science.gov (United States)

    2013-05-06

    ... Standards Oversight and Technology Committee Meetings Sheraton Boston Hotel, 39 Dalton Street, Boston, MA, 02199. May 8 (7:00 a.m.-5:00 p.m.) and May 9 (8:00 a.m.-1:00 p.m.), 2013 Further information regarding... American Electric Reliability Corporation For further information, please contact Jonathan First, 202-502...

  18. Toward Real-time Multi-criteria Decision Making for Bus Service Reliability Optimisation

    DEFF Research Database (Denmark)

    Tran, Vu The; Eklund, Peter; Cook, Chris

    2015-01-01

    factors (such as traffic congestion and bad weather) in high frequency transit operations often cause irregular headway that can result in decreased service reliability. The approach proposed in this paper, which has the capability of handling the uncertainty of transit operations based on Multi...

  19. Costing and pricing electric power reserve services. Final report

    International Nuclear Information System (INIS)

    Kirsch, L.D.; Rajaraman, R.; Clark, C.

    1997-12-01

    In the competitive electric power markets of the imminent future, reserves will be the second largest generation service in terms of their revenues and profits. Because reserves will be more widely traded than at present, they will be provided by the cheapest available sources regardless of the ownership of those sources. Price will determine the willingness of generators and consumers to provide reserve services; and it may also determine the willingness of reserve users to purchase reserve services. This report presents a methodology by which generation firms and merchant firms can profitably cost and price the reserve services that they offer. The methodology is generally applicable to a wide range of market structures that such firms might face

  20. Analysis and Optimization of Sparse Random Linear Network Coding for Reliable Multicast Services

    DEFF Research Database (Denmark)

    Tassi, Andrea; Chatzigeorgiou, Ioannis; Roetter, Daniel Enrique Lucani

    2016-01-01

    Point-to-multipoint communications are expected to play a pivotal role in next-generation networks. This paper refers to a cellular system transmitting layered multicast services to a multicast group of users. Reliability of communications is ensured via different random linear network coding (RLNC......) techniques. We deal with a fundamental problem: the computational complexity of the RLNC decoder. The higher the number of decoding operations is, the more the user's computational overhead grows and, consequently, the faster the battery of mobile devices drains. By referring to several sparse RLNC...... techniques, and without any assumption on the implementation of the RLNC decoder in use, we provide an efficient way to characterize the performance of users targeted by ultra-reliable layered multicast services. The proposed modeling allows to efficiently derive the average number of coded packet...

  1. Improving Reliability of Service Operation Using FMEA Review and New Opportunity for Investigations

    Science.gov (United States)

    Sutrisno, Agung; Gunawan, Indra

    2016-01-01

    Despite its growing contribution to the global economy, investigation on the application status of service FMEA study to support realization of reliable service operation is very limited in literature. Motivated by such situation, the paper presented an initial survey on the status and research gaps in developing and applying FMEA in service sectors. Systematic preliminary survey using specific criteria are undertaken. Our study indicated that development and application of service FMEA are partially addressing the characteristics of service operations and it is still applied into the good deed and profit oriented operations. Opportunities for further investigation pertaining to advancement of its decision supporting tool for service risk appraisal, its modification to cope with sustainability related requirements and application of service FMEA in not for profit oriented operations are presented as new avenues for further investigation

  2. Statistical method for the control of the electric power service interruptions (second part); Metodo de control estadistico de las interrupciones del servicio electrico (2a. parte)

    Energy Technology Data Exchange (ETDEWEB)

    Issouribehere, Pedro E.; Barbero, Juan C. [Universidad Nacional de La Plata (UNLP), Buenos Aires (Argentina). Facultad de Ingenieria. Inst. de Investigaciones Tecnologicas para Redes y Equipos Electricos (IITREE-LAT)]. E-mail: iitree@.ing.unlp.edu.ar; Martinez, Jorge L.; Galinski, Alejandro [Ente Nacional Regulador de la Electricidad (ENRE), Buenos Aires (Argentina)

    2001-07-01

    This paper presents the register of interruptions in application points of the concession areas of three concessionaires. The reliability indexes are presented of the controlled sites: interruption ratio {lambda}, time of average reposition r and unavailability Q obtained with the field information recompiled during three years from June 2000. The paper also obtains by concessionaire, the ratios of brief interruptions occurrence which constitutes another indicator of the Electric Service Quality.

  3. An Investigation of Incorporating Dialogical Argumentation into Peer Instruction (PI for Pre-Service Teacher Learning of Current Electricity

    Directory of Open Access Journals (Sweden)

    Aina Jacob Kola

    2017-05-01

    Full Text Available The study is a quasi-experimental research employing the pretest-posttest design. 52 pre-service teachers from a college of education were sampled with 26 pre-service teachers in both the control group (CG and experimental group (EG. The instruments used to collect data were Physics Achievement Test (PAT, Peer Instruction Dialogical Argumentation Questionnaire (PIDAQ, and Adopted Physics ConcepTest (APC for teaching the experimental group. The instruments were validated by experts in science education and physics. The reliability of the PAT, based on a pilot test conducted, shows that the Cronbach’s alpha coefficient is 0.876. The data obtained were analyzed using t-test, Analysis of Covariance (ANCOVA, and descriptive statistics. Findings revealed that the incorporation of DA into PI has an impact on the students’ learning of current electricity. The study considered some implications of the findings on the teaching and learning of physics.

  4. Electrical energy market management in deregulated power system

    International Nuclear Information System (INIS)

    Abady, A. F.; Niknam, T.

    2003-01-01

    For many decades, vertically integrated electric utilities monopolized the way they control, sell and distribute electricity to customers in their service territories. In this monopoly, each utility managed three main components of the system: generation, transmission and distribution. Analogous to perceived competitions in airline, communication and natural gas industries which demonstrated that vertically integrated monopolies could not provide services as efficiently as competitive firms, the electric power industry plans to improve its efficiency by providing a more reliable energy at least cost to customers. A competition is guaranteed by establishing a restructured environment in which customers could choose to buy from different suppliers and change suppliers as they wish in order to pay market base rates. This paper is dealing with progressive approach of restructuring in power and introduce ISO, its functions and model of electrical energy markets

  5. METHODS OF IMPROVING THE RELIABILITY OF THE CONTROL SYSTEM TRACTION POWER SUPPLY OF ELECTRIC TRANSPORT BASED ON AN EXPERT INFORMATION

    Directory of Open Access Journals (Sweden)

    O. O. Matusevych

    2009-03-01

    Full Text Available The author proposed the numerous methods of solving the multi-criterion task – increasing of reliability of control system on the basis of expert information. The information, which allows choosing thoughtfully the method of reliability increasing for a control system of electric transport, is considered.

  6. A critical assessment of the Hong Kong Government's proposed post-2008 regulatory regime for local electricity utilities

    International Nuclear Information System (INIS)

    Woo, Chi-Keung; Horowitz, Ira; Tishler, Asher

    2006-01-01

    In December 2005, the Hong Kong Government issued a 'Consultation Paper on Future Development of the Electricity Markets in Hong Kong: Stage II Consultation,' proposing a post-2008 regulatory regime upon the expiration of the existing regulatory contract between the Hong Kong Government and each of the two local electricity utilities. We assess the proposal using the criteria of safe, reliable, and environmentally friendly service at the lowest rates that will allow the utilities reasonable returns on their investments. We caution that if fully adopted, the highly risky proposal may lead to less-reliable service without the compensating benefits to the environment

  7. Enhancing reactor availability factor by diagnostic monitoring and data acquisition of electrical equipments

    International Nuclear Information System (INIS)

    Singh, G.

    2006-01-01

    Electrical energy has made significant contribution to rapid growth of industrial activity in the country. Development and improvement of energy conversion devices or electrical apparatus have supported the growth. Reliability is probably the most important factor in electrical supply system, not only to give uninterrupted service but to provide an economic supply. Regular diagnostic testing of electrical equipments will make a significant contribution to the reliability of electrical supply. The purpose of diagnostic monitoring is to recognize the development of faults at an early stage, which consequently allows greater freedom to schedule the outages resulting in lower downtime and lower capitalized losses. The insulation constitutes the heart of any electrical/power equipment. The insulation in power equipment in normal condition undergoes certain changes in the physical, chemical, electrical and mechanical properties. The change with respect to time in the presence of an influencing factor, more often a stress (electrical) is referred to as ageing. The deterioration of insulating material plays an important role in the assessing the condition of electrical equipments. The systematic diagnostic tests are also part of the maintenance program to ensure the continued serviceability of electrical equipments, by replacing or repairing the components likely to fail, as revealed by the test. Diagnostic tests are carried out on various electrical equipments for detection of incipient fault, location and judging their severity. (author)

  8. Final Report to the National Energy Technology Laboratory on FY14- FY15 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Vittal, Vijay [Arizona State Univ., Tempe, AZ (United States); Lampis, Anna Rosa [Arizona State Univ., Tempe, AZ (United States)

    2018-01-16

    The Power System Engineering Research Center (PSERC) engages in technological, market, and policy research for an efficient, secure, resilient, adaptable, and economic U.S. electric power system. PSERC, as a founding partner of the Consortium for Electric Reliability Technology Solutions (CERTS), conducted a multi-year program of research for U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) to develop new methods, tools, and technologies to protect and enhance the reliability and efficiency of the U.S. electric power system as competitive electricity market structures evolve, and as the grid moves toward wide-scale use of decentralized generation (such as renewable energy sources) and demand-response programs. Phase I of OE’s funding for PSERC, under cooperative agreement DE-FC26-09NT43321, started in fiscal year (FY) 2009 and ended in FY2013. It was administered by DOE’s National Energy Technology Laboratory (NETL) through a cooperative agreement with Arizona State University (ASU). ASU provided sub-awards to the participating PSERC universities. This document is PSERC’s final report to NETL on the activities for OE, conducted through CERTS, from September 2015 through September 2017 utilizing FY 2014 to FY 2015 funding under cooperative agreement DE-OE0000670. PSERC is a thirteen-university consortium with over 30 industry members. Since 1996, PSERC has been engaged in research and education efforts with the mission of “empowering minds to engineer the future electric energy system.” Its work is focused on achieving: • An efficient, secure, resilient, adaptable, and economic electric power infrastructure serving society • A new generation of educated technical professionals in electric power • Knowledgeable decision-makers on critical energy policy issues • Sustained, quality university programs in electric power engineering. PSERC core research is funded by industry, with a budget supporting

  9. 78 FR 38311 - Reliability Technical Conference Agenda

    Science.gov (United States)

    2013-06-26

    ... issues related to the reliability of the Bulk-Power System. The agenda for this conference is attached... Reliability Technical Docket No. AD13-6-000 Conference. North American Electric Docket No. RC11-6-004 Reliability Corporation. North American Electric Docket No. RR13-2-000 Reliability Corporation. Not...

  10. 76 FR 16240 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits

    Science.gov (United States)

    2011-03-23

    ... identified by the Commission. \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... reliability of the interconnection by ensuring that the bulk electric system is assessed during the operations... responsibility for SOLs. Further, Bulk-Power System reliability practices assign responsibilities for analyzing...

  11. The North American electricity markets

    International Nuclear Information System (INIS)

    Harvie, I.

    1999-01-01

    The wide ranging changes that will drive the evolution of the North American electricity industry in the future are discussed. Deregulation and the advent of competition in both the United States and Canada are the principal forces that will change the shape of the electricity market, bringing new players and new forms of doing business into the marketplace. A review of the current state of the business shows that especially in the United States where deregulation began earlier than in Canada, independent generators already constitute a multi-billion dollar industry. Non-utility generation capacity is about seven per cent of total U.S. capacity and accounts for about 10 per cent of total U. S. electricity supply, including imports. Examples from other industries clearly show that restructuring and the breakup of vertically integrated industries could be accomplished much faster than anticipated, that a decrease in prices followed rapidly as products became more like commodities, and that decreasing prices fostered product differentiation and competition. Major legislation affecting the electric power industry in the U.S. and Canada (U.S. National Energy Policy Act 1992, Alberta Electric Utilities Act 1995, Ontario Energy Competition Act 1998) decreeing open access transmission, unbundling of generation, transmission and ancillary services, and promoting competition, and the impacts of these legislative actions are also reviewed. The most visible impact is the explosion that can be seen in power marketing and energy trading on a scale unimaginable only a few short years ago, where the total volume of trade may be worth multiples of the value of the underlying commodity. At the same time, there is concern about the reliability of the system, and thus making it imperative to find new ways to manage reliability. Various suggestions are made as to how increased reliability of supply could be achieved by better management, new standards and better enforcement of

  12. Fuel element services

    International Nuclear Information System (INIS)

    Marta, H.; Alvarez, P.; Jimenez, J.

    2006-01-01

    Refuelling outages comprise a number of maintenance tasks scheduled long in advance to assure a reliable operation throughout the next cycle and, in the long run, a safer and more efficient plant. Most of these tasks are routine service of mechanical and electrical system and likewise fuel an be considered a critical component as to handling, inspection, cleaning and repair. ENUSA-ENWESA AIE has been working in this area since 1995 growing from fuel repair to a more integrated service that includes new and spent fuel handling, inserts, failed fuel rod detection systems, ultrasonic fuel cleaning, fuel repair and a comprehensive array of inspection and tests related to the reliability of the mechanical components in the fuel assembly, all this, performed in compliance with quality, safety, health physics and any other nuclear standard. (Author)

  13. Electricity supply. The effects of competitive power purchases are not yet certain

    International Nuclear Information System (INIS)

    England-Joseph, Judy; Wood, David G.; Bausell, Charles W. Jr.; Farah, Philip G.; Alexander, Alice M.; Griffes, Peter H.; Jorritsma, James S.; Skud, Bruce; Dunbrack, Linda W.

    1990-08-01

    Most electricity in the United States is produced by utilities that own and operate facilities for the generation, transmission, and distribution of power. Utilities traditionally have operated as regulated monopolists, each within an established geographic area. In return, utilities have an obligation to provide reliable electricity to all consumers in their territory at a reasonable price. Many utility companies also participate in power pools, under which they may purchase electricity from one another to meet requirements. Utilities are allowed to earn a return on plants they own and operate, while the costs of purchased electricity are passed directly to consumers. To encourage the development of alternative energy resources, the Public Utility Regulatory Policies Act of 1978, as amended, (PURPA) required utilities to purchase power offered by qualifying facilities at a price not exceeding the utilities' avoided cost of generating it or purchasing it from another source. In part to help state regulators and utilities determine utilities' avoided costs and to help sort through a flood of bids, competitive bidding, which allows market forces to help determine prices, has emerged as a means of purchasing power from nonutility generators. Because several years are often required to construct generating sources, utilities have little operating experience with competitively purchased electricity. Thus, the effects of competitive power purchases on the long-term reliability of electric service - which is affected by the reliability of all sources and transmission and distribution facilities are not yet certain and difficult to assess. Among the three utilities reviewed, only at Central Maine Power have sources of competitively purchased power entered service, and they have operated reliably. However, each utility reviewed has accepted bids that were subsequently withdrawn, for financial or other reasons, prior to scheduled service dates. When selecting nonutility

  14. 75 FR 14342 - Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by...

    Science.gov (United States)

    2010-03-25

    ...; Order No. 697-D] Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary... affiliates.\\3\\ \\1\\ Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services...\\ Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public...

  15. Risk-based methods for reliability investments in electric power distribution systems

    Energy Technology Data Exchange (ETDEWEB)

    Alvehag, Karin

    2011-07-01

    Society relies more and more on a continuous supply of electricity. However, while under investments in reliability lead to an unacceptable number of power interruptions, over investments result in too high costs for society. To give incentives for a socio economically optimal level of reliability, quality regulations have been adopted in many European countries. These quality regulations imply new financial risks for the distribution system operator (DSO) since poor reliability can reduce the allowed revenue for the DSO and compensation may have to be paid to affected customers. This thesis develops a method for evaluating the incentives for reliability investments implied by different quality regulation designs. The method can be used to investigate whether socio economically beneficial projects are also beneficial for a profit-maximizing DSO subject to a particular quality regulation design. To investigate which reinvestment projects are preferable for society and a DSO, risk-based methods are developed. With these methods, the probability of power interruptions and the consequences of these can be simulated. The consequences of interruptions for the DSO will to a large extent depend on the quality regulation. The consequences for the customers, and hence also society, will depend on factors such as the interruption duration and time of occurrence. The proposed risk-based methods consider extreme outage events in the risk assessments by incorporating the impact of severe weather, estimating the full probability distribution of the total reliability cost, and formulating a risk-averse strategy. Results from case studies performed show that quality regulation design has a significant impact on reinvestment project profitability for a DSO. In order to adequately capture the financial risk that the DSO is exposed to, detailed riskbased methods, such as the ones developed in this thesis, are needed. Furthermore, when making investment decisions, a risk

  16. 2015 NREL Photovoltaic Module Reliability Workshops

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-14

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  17. 2016 NREL Photovoltaic Module Reliability Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-07

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology - both critical goals for moving PV technologies deeper into the electricity marketplace.

  18. Providing Reliability Services through Demand Response: A Prelimnary Evaluation of the Demand Response Capabilities of Alcoa Inc.

    Energy Technology Data Exchange (ETDEWEB)

    Starke, Michael R [ORNL; Kirby, Brendan J [ORNL; Kueck, John D [ORNL; Todd, Duane [Alcoa; Caulfield, Michael [Alcoa; Helms, Brian [Alcoa

    2009-02-01

    Demand response is the largest underutilized reliability resource in North America. Historic demand response programs have focused on reducing overall electricity consumption (increasing efficiency) and shaving peaks but have not typically been used for immediate reliability response. Many of these programs have been successful but demand response remains a limited resource. The Federal Energy Regulatory Commission (FERC) report, 'Assessment of Demand Response and Advanced Metering' (FERC 2006) found that only five percent of customers are on some form of demand response program. Collectively they represent an estimated 37,000 MW of response potential. These programs reduce overall energy consumption, lower green house gas emissions by allowing fossil fuel generators to operate at increased efficiency and reduce stress on the power system during periods of peak loading. As the country continues to restructure energy markets with sophisticated marginal cost models that attempt to minimize total energy costs, the ability of demand response to create meaningful shifts in the supply and demand equations is critical to creating a sustainable and balanced economic response to energy issues. Restructured energy market prices are set by the cost of the next incremental unit of energy, so that as additional generation is brought into the market, the cost for the entire market increases. The benefit of demand response is that it reduces overall demand and shifts the entire market to a lower pricing level. This can be very effective in mitigating price volatility or scarcity pricing as the power system responds to changing demand schedules, loss of large generators, or loss of transmission. As a global producer of alumina, primary aluminum, and fabricated aluminum products, Alcoa Inc., has the capability to provide demand response services through its manufacturing facilities and uniquely through its aluminum smelting facilities. For a typical aluminum smelter

  19. Flexible, Secure, and Reliable Data Sharing Service Based on Collaboration in Multicloud Environment

    Directory of Open Access Journals (Sweden)

    Qiang Wei

    2018-01-01

    Full Text Available Due to the abundant storage resources and high reliability data service of cloud computing, more individuals and enterprises are motivated to outsource their data to public cloud platform and enable legal data users to search and download what they need in the outsourced dataset. However, in “Paid Data Sharing” model, some valuable data should be encrypted before outsourcing for protecting owner’s economic benefits, which is an obstacle for flexible application. Specifically, if the owner does not know who (user will download which data files in advance and even does not know the attributes of user, he/she has to either remain online all the time or import a trusted third party (TTP to distribute the file decryption key to data user. Obviously, making the owner always remain online is too inflexible, and wholly depending on the security of TTP is a potential risk. In this paper, we propose a flexible, secure, and reliable data sharing scheme based on collaboration in multicloud environment. For securely and instantly providing data sharing service even if the owner is offline and without TTP, we distribute all encrypted split data/key blocks together to multiple cloud service providers (CSPs, respectively. An elaborate cryptographic protocol we designed helps the owner verify the correctness of data exchange bills, which is directly related to the owner’s economic benefits. Besides, in order to support reliable data service, the erasure-correcting code technic is exploited for tolerating multiple failures among CSPs, and we offer a secure keyword search mechanism that makes the system more close to reality. Extensive security analyses and experiments on real-world data show that our scheme is secure and efficient.

  20. Electricity market reform failures: UK, Norway, Alberta and California

    International Nuclear Information System (INIS)

    Chikeung Woo; Lloyd, Debra; Tishler, Asher

    2003-01-01

    An analysis of electricity market reforms already taken place in the UK, Norway, Alberta (Canada) and California (USA) leads to our overall conclusion that the introduction of a competitive generation market, of itself, has failed to deliver reliable service at low and stable prices. The market reform failures are attributed to market power abuse by few dominant sellers (especially at times of transmission congestion), poor market design that invites strategic bidding by suppliers, the lack of customer response to price spikes, capacity shortage caused by demand growth not matched by new capacity, and thin trading of forward and futures contracts that are critical for price discovery and risk management. The paper then explains why an electricity market reform can easily fail to deliver the promised gains of better service at lower and more stable prices. The policy implication is that an electric market reform can be extremely risky, and may lead to a disastrous outcome. Thus, it is imprudent to implement such a reform in countries with limited sites for new generation and no indigenous fuels (e.g., Israel and Hong Kong). These countries should therefore consider introducing performance-based regulation that can immediately benefit electricity consumers in terms of lower prices, more stable prices, improved reliability, more choices, while encouraging the electric sector to pursue efficient operation and investment. (Author)

  1. Electricity market reform failures: UK, Norway, Alberta and California

    International Nuclear Information System (INIS)

    Woo, C.-K.; Lloyd, Debra; Tishler, Asher

    2003-01-01

    An analysis of electricity market reforms already taken place in the UK, Norway, Alberta (Canada) and California (USA) leads to our overall conclusion that the introduction of a competitive generation market, of itself, has failed to deliver reliable service at low and stable prices. The market reform failures are attributed to market power abuse by few dominant sellers (especially at times of transmission congestion), poor market design that invites strategic bidding by suppliers, the lack of customer response to price spikes, capacity shortage caused by demand growth not matched by new capacity, and thin trading of forward and futures contracts that are critical for price discovery and risk management. The paper then explains why an electricity market reform can easily fail to deliver the promised gains of better service at lower and more stable prices. The policy implication is that an electric market reform can be extremely risky, and may lead to a disastrous outcome. Thus, it is imprudent to implement such a reform in countries with limited sites for new generation and no indigenous fuels (e.g., Israel and Hong Kong). These countries should therefore consider introducing performance-based regulation that can immediately benefit electricity consumers in terms of lower prices, more stable prices, improved reliability, more choices, while encouraging the electric sector to pursue efficient operation and investment

  2. RTE - 2013 Reliability Report

    International Nuclear Information System (INIS)

    Denis, Anne-Marie

    2014-01-01

    RTE publishes a yearly reliability report based on a standard model to facilitate comparisons and highlight long-term trends. The 2013 report is not only stating the facts of the Significant System Events (ESS), but it moreover underlines the main elements dealing with the reliability of the electrical power system. It highlights the various elements which contribute to present and future reliability and provides an overview of the interaction between the various stakeholders of the Electrical Power System on the scale of the European Interconnected Network. (author)

  3. High Electricity Demand in the Northeast U.S.: PJM Reliability Network and Peaking Unit Impacts on Air Quality.

    Science.gov (United States)

    Farkas, Caroline M; Moeller, Michael D; Felder, Frank A; Henderson, Barron H; Carlton, Annmarie G

    2016-08-02

    On high electricity demand days, when air quality is often poor, regional transmission organizations (RTOs), such as PJM Interconnection, ensure reliability of the grid by employing peak-use electric generating units (EGUs). These "peaking units" are exempt from some federal and state air quality rules. We identify RTO assignment and peaking unit classification for EGUs in the Eastern U.S. and estimate air quality for four emission scenarios with the Community Multiscale Air Quality (CMAQ) model during the July 2006 heat wave. Further, we population-weight ambient values as a surrogate for potential population exposure. Emissions from electricity reliability networks negatively impact air quality in their own region and in neighboring geographic areas. Monitored and controlled PJM peaking units are generally located in economically depressed areas and can contribute up to 87% of hourly maximum PM2.5 mass locally. Potential population exposure to peaking unit PM2.5 mass is highest in the model domain's most populated cities. Average daily temperature and national gross domestic product steer peaking unit heat input. Air quality planning that capitalizes on a priori knowledge of local electricity demand and economics may provide a more holistic approach to protect human health within the context of growing energy needs in a changing world.

  4. Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

  5. 75 FR 71625 - System Restoration Reliability Standards

    Science.gov (United States)

    2010-11-24

    ... to start operating and delivering electric power without assistance from the electric system... and system restoration and reporting following disturbances. \\3\\ North American Electric Reliability... Reliability Standards for the Bulk-Power System and determined that the proposed requirements are necessary to...

  6. Electric vehicle fleet management in smart grids: A review of services, optimization and control aspects

    DEFF Research Database (Denmark)

    Hu, Junjie; Morais, Hugo; Sousa, Tiago

    2016-01-01

    Electric vehicles can become integral parts of a smart grid, since they are capable of providing valuable services to power systems other than just consuming power. On the transmission system level, electric vehicles are regarded as an important means of balancing the intermittent renewable energy...... resources such as wind power. This is because electric vehicles can be used to absorb the energy during the period of high electricity penetration and feed the electricity back into the grid when the demand is high or in situations of insufficient electricity generation. However, on the distribution system...... and industries. This paper presents a review and classification of methods for smart charging (including power to vehicle and vehicle-to-grid) of electric vehicles for fleet operators. The study firstly presents service relationships between fleet operators and other four actors in smart grids; then, modeling...

  7. Service and obligations of public service in the electrical sector law; Servicio universal y obligaciones de servicio publico en la Ley del Sector Electrico

    Energy Technology Data Exchange (ETDEWEB)

    Cuetara Martinez, J.M. de la; Gonzalez Sanfiel, A.

    1998-12-01

    Our article starts from the need of reconsidering the traditional public service concept; to this goal, the new categories universal service and public service obligations are useful instruments. After defining its notes, we identify them as different kinds of a common gender and separate then from other next categories, as are general interest services and policy obligations. Finally, we applied the obtained findings to the Electricity Sector, identifying an universal service in the supply of electrical energy to all the claimants and various concrete public service obligations in its principal sub sectors (production, transportation, distribution, trading and supply). (Author)

  8. Laboratory services series: an electrical outlet and corded equipment inspection program

    International Nuclear Information System (INIS)

    Davis, E.A.

    1976-04-01

    A research and development laboratory has thousands of electrical outlets providing power to laboratories, offices, shops, and service areas. These outlets provide power for a wide variety of portable equipment and tools that are equipped with cord and plug. Electric safety requires a periodic check of outlet grounding capability and continuing inspection and repair of corded equipment. Personnel, equipment, reports, procedures, and schedule requirements are reported

  9. 78 FR 46177 - Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric...

    Science.gov (United States)

    2013-07-30

    ...-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage... Financial Reporting for New Electric Storage Technologies, Notice of Proposed Rulemaking, FERC Stats. & Regs... Commission 18 CFR Parts 35 and 101 Third-Party Provision of Ancillary Services; Accounting and Financial...

  10. UFISA: electric facility engineering for the service of emergy market

    International Nuclear Information System (INIS)

    Gutierrez Zapico, A.

    1997-01-01

    UFISA is the engineering company with the experience of UNION ELECTRICA FENOSA S.A. It activity began in 1990. This company offers to national and international markets the services for energy consumers and for the electricity costumers. (Author)

  11. Intelligent Electric Vehicle Integration - Domain Interfaces and Supporting Informatics

    DEFF Research Database (Denmark)

    Andersen, Peter Bach

    This thesis seeks to apply the field of informatics to the intelligent integration of electric vehicles into the power system. The main goal is to release the potential of electric vehicles in relation to a reliable, economically efficient power system based on renewables. To make intelligent EV...... and services in which the electric vehicle may be best suited to participate. The next stakeholder investigated is the distribution system operator representing the low voltage grid. The challenge is assessed by considering a number of grid impacts studies. Next, a set of grid congestion mitigation strategies...

  12. Reliability assessment of hydraulic cylinders considering service loads and flaw distribution

    International Nuclear Information System (INIS)

    Altamura, Alessandra; Beretta, Stefano

    2012-01-01

    Manufacturing process, service conditions and material properties are all necessary requirements to a good design of tubular mechanical components subjected to fatigue. The most common approach to this design is usually deterministic, where a fixed NDT threshold, related to flaw acceptance limit, is set. However many uncertainties are left aside, i.e. the failure probability related to the fatigue strength under applied loads. This paper addresses the reliability evaluation of tubular mechanical components carrying some flaws and subjected to cyclic internal pressure variation. The aim is comparing the probability of failure obtained under several assumptions. A reliability assessment model, based on a random variable approach, has been implemented by using the Monte Carlo method. The analysis of the results, from a case study based on load spectra measurements of hydraulic cylinders of earth moving machines, has consented to evaluate the most important factors influencing the fatigue life prediction of these components. Highlights: ► Reliability evaluation of tubular components subjected to variable internal pressure. ► The dispersion of the threshold controls the stochasticity of crack growth. ► A random variable model has been developed using Monte Carlo. ► Initial crack size and spectrum shape are key factors in reliability evaluation.

  13. Assessing rural small community water supply in Limpopo, South Africa: water service benchmarks and reliability.

    Science.gov (United States)

    Majuru, Batsirai; Jagals, Paul; Hunter, Paul R

    2012-10-01

    Although a number of studies have reported on water supply improvements, few have simultaneously taken into account the reliability of the water services. The study aimed to assess whether upgrading water supply systems in small rural communities improved access, availability and potability of water by assessing the water services against selected benchmarks from the World Health Organisation and South African Department of Water Affairs, and to determine the impact of unreliability on the services. These benchmarks were applied in three rural communities in Limpopo, South Africa where rudimentary water supply services were being upgraded to basic services. Data were collected through structured interviews, observations and measurement, and multi-level linear regression models were used to assess the impact of water service upgrades on key outcome measures of distance to source, daily per capita water quantity and Escherichia coli count. When the basic system was operational, 72% of households met the minimum benchmarks for distance and water quantity, but only 8% met both enhanced benchmarks. During non-operational periods of the basic service, daily per capita water consumption decreased by 5.19l (pwater sources were 639 m further (p ≤ 0.001, 95% CI 560-718). Although both rudimentary and basic systems delivered water that met potability criteria at the sources, the quality of stored water sampled in the home was still unacceptable throughout the various service levels. These results show that basic water services can make substantial improvements to water access, availability, potability, but only if such services are reliable. Copyright © 2012 Elsevier B.V. All rights reserved.

  14. 75 FR 71425 - Border Energy Electric Services, Inc.; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2010-11-23

    ... proceeding, of Border Energy Electric Services, Inc.'s application for market-based rate authority, with an... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2088-000] Border Energy Electric Services, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

  15. Scheduling and location issues in transforming service fleet vehicles to electric vehicles

    DEFF Research Database (Denmark)

    Mirchandani, Pitu; Madsen, Oli B.G.; Adler, Jonathan

    There is much reason to believe that fleets of service vehicles of many organizations will transform their vehicles that utilize alternative fuels which are more sustainable. The electric vehicle is a good candidate for this transformation, especially which “refuels” by exchanging its spent...... batteries with charged ones. This paper discusses the issues that must be addressed if a transit service were to use electric vehicles, principally the issues related to the limited driving range of each electric vehicle’s set of charged batteries and the possible detouring for battery exchanges....... In particular, the paper addresses the optimization and analysis of infrastructure design alternatives dealing with (1) the number of battery-exchange stations, (2) their locations, (3) the recharging capacity and inventory management of batteries at each facility, and (4) routing and scheduling of the fleet...

  16. Public service obligation in liberalized electricity markets. Who is the provider of last resort?; Jiyuka jidai ni okeru kokyo service gimu. Dare ga last resort kyokyusha to naru k

    Energy Technology Data Exchange (ETDEWEB)

    Maruyama, M. [Central Research Inst. of Electric Power Industry, Tokyo (Japan)

    2000-03-01

    Electric power is an asset indispensable to the modern society, and it is needed to secure the universal service. The universal service has been secured by obliging the existing electric utilities operators to supply electric power. However, since the systematical reform in the electric utility business extends down to the liberalization in the retailing sector, it becomes impossible to oblige electric power supply service to supply the same as conventionally. Even under these circumstances, to continuously secure the universal service, a method is considered for obliging special suppliers (last resort suppliers) to supply electric power to users who are unable to be supplied from anyone. This paper studies who should be the last resort supplier using mainly samples from the U.S. (translated by NEDO)

  17. Competition and deregulation in the electric industry. A study of organizational change: The New York State Public Service Commission

    Science.gov (United States)

    Ashley, Deborah J. Cordaro

    2000-11-01

    Public organizations are formed in response to societal needs. They collect taxes, educate children, enforce laws and provide protection to the environment, the nation and consumers. One such organization is the New York State Public Service Commission. In 1907, legislation was passed to form the New York State Public Service Commission the first regulatory body of its kind in the United States. Its mission was to provide safe, reliable and reasonably priced electricity. Subsequently, this became the model that was implemented in every state in the nation. The past decade heralds an era of competition and a lessening of regulatory control. The telephone, natural gas and airline industries are in various stages of deregulation, and the electric industry is beginning down this path as well. In an environment such as this, are regulatory organizations necessary, and if they are, how can they organize to meet the new societal requirements? The case of the New York State Public Service Commission at this point in time offers a real time study of a regulatory body immersed in an environment that is calling for competition and an end to big government. Utilizing case studies of industries that have deregulated, or are in the process of deregulating, indicates a future societal need for regulations. This result does not lead to a conclusion that organizational change is unnecessary. This Dissertation will lay out the current organizational structure of the Public Service Commission, give an overview of the environmental signals, describe the mission/core values, and illustrate general political and employee factors that are indigenous to public service. Utilizing both classic and current organizational theory, an evaluation will be made of the Commission's need for change, their ability to change, and obstacles they may encounter.

  18. Guide to Cybersecurity, Resilience, and Reliability for Small and Under-Resourced Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Ingram, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Martin, Maurice [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-01-01

    Small electricity utilities -- those with less than 100 employees or 50,000 meters -- provide essential services to large parts of the United States while facing a number of challenges unique to their mission. For instance, they often serve areas that are sparsely populated, meaning that their per-customer cost to provide service is higher. At the same time, they often serve customers that have moderate or fixed incomes, meaning that they are under strong pressure to keep costs down. This pressure puts them on a strict budget and creates a need for innovative solutions to common problems. Further, their service areas may include extreme climates, making severe weather events more frequent and their aftermaths more expensive to address. This guide considers challenges that small utilities face while ensuring the reliability, resilience, and cybersecurity of their electric service; approaches to address those challenges using existing guidance documents; ways that the federal government could provide support in these areas.

  19. 75 FR 15371 - Time Error Correction Reliability Standard

    Science.gov (United States)

    2010-03-29

    ... Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers. As the independent system operator for the region, ERCOT schedules power on an electric grid that... Coordinating Council (WECC) is responsible for coordinating and promoting bulk electric system reliability in...

  20. Coordinated emergency response in a competitive electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Brindley, S. [Independent Electricity Market Operator, Toronto, ON (Canada)

    2002-07-01

    The Ontario Electricity Act and the Market Rules oblige electricity market participants to prepare and submit emergency plans to ensure the safe and reliable operation of the power system. Security and emergency preparedness includes emergency planning, drills and exercises, and critical infrastructure protection. The risk of power disruption is credible and the impact is large, as witnessed by the 1998 ice storm in eastern Ontario which resulted in major power outages, and as witnessed by the events of September 11, 2001. The emergency control actions that manage power system contingencies include recalling planned outages, reducing interchanges, increasing reserves, reducing voltage, purchasing emergency energy, and load shedding. Restoration priorities are to first restore power to critical transmission and generating station service loads, then to restore critical telecom facilities. This is followed by the restoration of customer loads only to the extent needed to control voltage and secure generating units. The final priority is to interconnect neighbours. The North American Electric Reliability Council (NERC) was established following the major 1965 blackout. NERC developed operational reliability standards and monitored compliance. A map depicting NERC regions and control areas in the US was presented. In Canada, the Canadian Electricity Association (CEA) addresses issues regarding critical infrastructure protection (CIP). It safeguards the essential components of the electricity infrastructure against physical and cyber threats through early warning systems and information sharing. 9 figs.

  1. 78 FR 38851 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-06-28

    ... either: Provide little protection for Bulk-Power System reliability or are redundant with other aspects... for retirement either: (1) Provide little protection for Bulk-Power System reliability or (2) are... to assure reliability of the Bulk-Power System and should be withdrawn. We have identified 41...

  2. Reliability of power system with open access

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A. M.; Fotuhi Firuzabad, M.; Ehsani, M.

    2003-01-01

    Recently, in many countries, electric utility industry is undergoing considerable changes in regard to its structure and regulation. It can be clearly seen that the thrust towards privatization and deregulation or re regulation of the electric utility industry will introduce numerous reliability problems that will require new criteria and analytical tools that recognize the residual uncertainties in the new environment. In this paper, different risks and uncertainties in competitive electricity markets are briefly introduced; the approach of customers, operators, planners, generation bodies and network providers to the reliability of deregulated system is studied; the impact of dispersed generation on system reliability is evaluated; and finally, the reliability cost/reliability worth issues in the new competitive environment are considered

  3. Renewable Energy Technologies for Decentralised Rural Electricity Services. Report from an International Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Kjellstroem, Bjoern; Arvidson, Anders; Forslund, Helena; Martinac, Ivo (eds.)

    2005-02-01

    The developing countries represented at the workshop were Brazil, India, Kenya, Mali, Mongolia, Nepal and Uganda. After keynote presentations which covered the experiences of different renewable electricity generation technologies in selected developing countries, the participants discussed the role of electrification in rural development, needs for further technological improvements and the needs for development of government policies for promotion of renewable energy for electricity generation. Finally, the participants discussed and agreed on recommendations addressed to donor agencies for consideration when formulating a revised Energy Policy. Renewable energy technologies should only be considered when these offer more advantages than the conventional alternatives - grid connection or stand-alone diesel generators. Such advantages may be lower costs, better supply reliability, fewer adverse local environmental impacts or better possibilities for local income-generating activities. Local needs and priorities must determine the choice of technology. Biomass-fuelled renewable technologies have a particularly strong potential in generating local economic activities compared to conventional supply options. Technologies for decentralised electricity generation using mini-hydro power plants, solar photovoltaics (PV), wind generators and biomass fuels are commercially available and are being applied in many developing countries. The limiting factors for further penetration of renewable energy are today linked to issues of cost, reliability, financing, service infrastructure, awareness of available technology and trust in the technologies from the perspective of entrepreneurs and end-users. One important limiting factor related to cost, is the capacity range within which each technology can compete with the conventional options. PV systems are still only realistic for very small power demands, whereas technologies using biomass fuels are unrealistic for small power

  4. Reliability issues : a Canadian perspective

    International Nuclear Information System (INIS)

    Konow, H.

    2004-01-01

    A Canadian perspective of power reliability issues was presented. Reliability depends on adequacy of supply and a framework for standards. The challenges facing the electric power industry include new demand, plant replacement and exports. It is expected that demand will by 670 TWh by 2020, with 205 TWh coming from new plants. Canada will require an investment of $150 billion to meet this demand and the need is comparable in the United States. As trade grows, the challenge becomes a continental issue and investment in the bi-national transmission grid will be essential. The 5 point plan of the Canadian Electricity Association is to: (1) establish an investment climate to ensure future electricity supply, (2) move government and industry towards smart and effective regulation, (3) work to ensure a sustainable future for the next generation, (4) foster innovation and accelerate skills development, and (5) build on the strengths of an integrated North American system to maximize opportunity for Canadians. The CEA's 7 measures that enhance North American reliability were listed with emphasis on its support for a self-governing international organization for developing and enforcing mandatory reliability standards. CEA also supports the creation of a binational Electric Reliability Organization (ERO) to identify and solve reliability issues in the context of a bi-national grid. tabs., figs

  5. Towards Reliable Integrated Services for Dependable Systems

    DEFF Research Database (Denmark)

    Schiøler, Henrik; Ravn, Anders Peter; Izadi-Zamanabadi, Roozbeh

    Reliability issues for various technical systems are discussed and focus is directed towards distributed systems, where communication facilities are vital to maintain system functionality. Reliability in communication subsystems is considered as a resource to be shared among a number of logical c...... applications residing on alternative routes. Details are provided for the operation of RRRSVP based on reliability slack calculus. Conclusions summarize the considerations and give directions for future research....... connections and a reliability management framework is suggested. We suggest a network layer level reliability management protocol RRSVP (Reliability Resource Reservation Protocol) as a counterpart of the RSVP for bandwidth and time resource management. Active and passive standby redundancy by background...

  6. Towards Reliable Integrated Services for Dependable Systems

    DEFF Research Database (Denmark)

    Schiøler, Henrik; Ravn, Anders Peter; Izadi-Zamanabadi, Roozbeh

    2003-01-01

    Reliability issues for various technical systems are discussed and focus is directed towards distributed systems, where communication facilities are vital to maintain system functionality. Reliability in communication subsystems is considered as a resource to be shared among a number of logical c...... applications residing on alternative routes. Details are provided for the operation of RRRSVP based on reliability slack calculus. Conclusions summarize the considerations and give directions for future research....... connections and a reliability management framework is suggested. We suggest a network layer level reliability management protocol RRSVP (Reliability Resource Reservation Protocol) as a counterpart of the RSVP for bandwidth and time resource management. Active and passive standby redundancy by background...

  7. Contribution of service companies

    International Nuclear Information System (INIS)

    Sole, L. M.; Cortes, A.

    2002-01-01

    The most influential aspect when choosing the model of contract between Client and Contractor relapses into the maturity reached by both parts. The service supplier will have to show his competence with his resume, not only technical, but also of actual actions concerning availability reliability, maintainability, security, environment and costs. That maturity may have been the reason why most of the service companies, of national scope, that carry out maintenance of nuclear power stations electricity and instrumentation nowadays, are present from the assembly and implementation phases of these nuclear power stations. (Author)

  8. Reliability of supply in competitive electricity markets: The Nordic electricity Market

    International Nuclear Information System (INIS)

    Singh, Balbir

    2005-12-01

    An overview of the current regulation and performance of the network utilities with respect to the reliability of supply across Europe in general indicates wide variation. On the regional level the situation in the Nordic market is no exception. Can the variation in reliability of supply in Nordic region be explained by differences in regulatory frameworks in the Nordic countries and is it possible to draw any best practice lessons for other countries and regions? The Norwegian regulation and performance with respect to reliability criterion is encouraging, however it must be emphasized that the Norwegian experience with reliability regulation in its current form covers a period of 3 years, a period that is too short to evaluate the Norwegian model. A closer examination of the Norwegian model reveals dynamic trade off in reliability performance, which if permanent may endanger the reliability of supply in the long-run. Last, but not the least important is the criterion that choice of regulation should be based on a careful social cost-benefit analysis of the regulatory model where both cost incurred by the regulatory agencies and the compliance costs incurred by the regulated utilities are included. A preliminary analysis of regulatory agencies in the Nordic market indicates that Norwegian model of network regulation is quite resource incentive. While it is premature to draw conclusions about the national regulatory mechanisms, the Nordic cross border regulation through voluntary arrangements under the auspices of NORDEL provides a good example of an arrangement that is useful when implementation of a formal regulatory regime across different jurisdiction is not possible

  9. Business Cases for Microgrids: Modeling Interactions of Technology Choice, Reliability, Cost, and Benefit

    Science.gov (United States)

    Hanna, Ryan

    Distributed energy resources (DERs), and increasingly microgrids, are becoming an integral part of modern distribution systems. Interest in microgrids--which are insular and autonomous power networks embedded within the bulk grid--stems largely from the vast array of flexibilities and benefits they can offer stakeholders. Managed well, they can improve grid reliability and resiliency, increase end-use energy efficiency by coupling electric and thermal loads, reduce transmission losses by generating power locally, and may reduce system-wide emissions, among many others. Whether these public benefits are realized, however, depends on whether private firms see a "business case", or private value, in investing. To this end, firms need models that evaluate costs, benefits, risks, and assumptions that underlie decisions to invest. The objectives of this dissertation are to assess the business case for microgrids that provide what industry analysts forecast as two primary drivers of market growth--that of providing energy services (similar to an electric utility) as well as reliability service to customers within. Prototypical first adopters are modeled--using an existing model to analyze energy services and a new model that couples that analysis with one of reliability--to explore interactions between technology choice, reliability, costs, and benefits. The new model has a bi-level hierarchy; it uses heuristic optimization to select and size DERs and analytical optimization to schedule them. It further embeds Monte Carlo simulation to evaluate reliability as well as regression models for customer damage functions to monetize reliability. It provides least-cost microgrid configurations for utility customers who seek to reduce interruption and operating costs. Lastly, the model is used to explore the impact of such adoption on system-wide greenhouse gas emissions in California. Results indicate that there are, at present, co-benefits for emissions reductions when customers

  10. Simulated annealing to handle energy and ancillary services joint management considering electric vehicles

    DEFF Research Database (Denmark)

    Sousa, Tiago M; Soares, Tiago; Morais, Hugo

    2016-01-01

    The massive use of distributed generation and electric vehicles will lead to a more complex management of the power system, requiring new approaches to be used in the optimal resource scheduling field. Electric vehicles with vehicle-to-grid capability can be useful for the aggregator players...... in the mitigation of renewable sources intermittency and in the ancillary services procurement. In this paper, an energy and ancillary services joint management model is proposed. A simulated annealing approach is used to solve the joint management for the following day, considering the minimization...... of the aggregator total operation costs. The case study considers a distribution network with 33-bus, 66 distributed generation and 2000 electric vehicles. The proposed simulated annealing is matched with a deterministic approach allowing an effective and efficient comparison. The simulated annealing presents...

  11. Automated Energy Distribution and Reliability System: Validation Integration - Results of Future Architecture Implementation

    Energy Technology Data Exchange (ETDEWEB)

    Buche, D. L.

    2008-06-01

    This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects. This report is second in a series of reports detailing this effort.

  12. RTE - 2015 Reliability Report. Summary

    International Nuclear Information System (INIS)

    2016-01-01

    Every year, RTE produces a reliability report for the past year. This report includes a number of results from previous years so that year-to-year comparisons can be drawn and long-term trends analysed. The 2015 report underlines the major factors that have impacted on the reliability of the electrical power system, without focusing exclusively on Significant System Events (ESS). It describes various factors which contribute to present and future reliability and the numerous actions implemented by RTE to ensure reliability today and in the future, as well as the ways in which the various parties involved in the electrical power system interact across the whole European interconnected network

  13. Economic Dispatch of Electric Energy Storage with Multi-service Provision

    DEFF Research Database (Denmark)

    You, Shi; Træholt, Chresten; Poulsen, Bjarne

    2011-01-01

    This paper develops a generic optimization model that explores the difficulty met by Electric Energy Storage (EES) systems when economic dispatch for multiple-service provision is requested. Such a model is further used to investigate the economic performance of an EES system which meets the 10...

  14. In-service inspection as an aid to steel pressure vessel reliability

    International Nuclear Information System (INIS)

    Nichols, R.W.

    1975-01-01

    In-service inspection has played an important role in non-nuclear pressure vessel technology, being a legal requirement in many countries. Evidence from surveys of reliability of non-nuclear plant has suggested that such inspections can be effective in reducing the risk of subsequent failures. Recent requirements of the ASME XI code which will be summarised have important implications on the techniques to be used for in-service inspection, and so on design and fabrication aspects. Moreover, in-service inspection can only be an effective procedure if its possible weaknesses are recognised. The first problem is to ensure that an ultrasonic technique is used which is capable of detecting defects of an order of magnitude smaller than the critical size for each particular situation, in whatever defect orientation is important. The potential of different ultrasonic techniques will be compared. Next it is necessary to ensure coverage of all the relevant material. In this respect machine operation is superior to manual scanning, so that manipulation and scanning devices have to be developed. Problems of local geometry and of deviations in geometry have to be discussed with designer and fabricator; plate and clad quality have to be controlled (with respect to surface contour, metallurgical condition and freedom from interfering defects) to ensure inspectability in depth. The reliability of the mechanical and electronic equipment has to be assessed and designed to meet high requirements. Some presentational aids to detection and interpretation will be discussed. Having located a potential defect, the application of fracture mechanics treatments requires knowledge of size, shape and orientation. Some of the problems will be discussed together with possible solutions. (author)

  15. Electric industry restructuring review

    International Nuclear Information System (INIS)

    Slocum Hollis, S.

    2004-01-01

    Restructuring of the electric power industry began in the early 1990's in many jurisdictions in the United States. Restructuring was an attempt to offer large industrial customers lower rates and freedom from regulation for generators and traditional public utilities. The move has gained most attention in the past two years as some utilities report high profits while others, such as Pacific Gas and Electric Co., the largest investor-owned utility in the United States, is in bankruptcy. The August 2003 blackout in the Midwest and Northeast United States and Canada also raised questions regarding electric reliability. The question now remains whether markets should be allowed to determine the need for services and the prices to be charged, and who is in charge in the imperfect market. The Federal Energy Regulatory Commission's (FERC) Order 2000 led to the formation of a Regional Transmission Organizations which is still in the implementation stage. Its influence on precursor Order numbers 888 and 889 were discussed in this paper with reference to independent system operators; regional transmission organizations; standard market design; rates and pricing devices; congestion management; market monitoring; market investigations; reliability measures; OASIS and other information access; interconnection policy; jurisdiction; mergers and merger policy; standards of conduct; policing affiliates; municipal utilities; stranded costs; and, state restructuring scorecards. refs

  16. 18 CFR 39.5 - Reliability Standards.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reliability Standards... RELIABILITY STANDARDS § 39.5 Reliability Standards. (a) The Electric Reliability Organization shall file each Reliability Standard or modification to a Reliability Standard that it proposes to be made effective under...

  17. Reliability evaluation of smart distribution grids

    OpenAIRE

    Kazemi, Shahram

    2011-01-01

    The term "Smart Grid" generally refers to a power grid equipped with the advanced technologies dedicated for purposes such as reliability improvement, ease of control and management, integrating of distributed energy resources and electricity market operations. Improving the reliability of electric power delivered to the end users is one of the main targets of employing smart grid technologies. The smart grid investments targeted for reliability improvement can be directed toward the generati...

  18. State Electricity Regulatory Policy and Distributed Resources: Accommodating Distributed Resources in Wholesale Markets

    Energy Technology Data Exchange (ETDEWEB)

    Weston, F.; Harrington, C.; Moskovitz, D.; Shirley, W.; Cowart, R.; Sedano, R.

    2002-10-01

    Distributed resources can provide cost-effective reliability and energy services - in many cases, obviating the need for more expensive investments in wires and central station electricity generating facilities. Given the unique features of distributed resources, the challenge facing policymakers today is how to restructure wholesale markets for electricity and related services so as to reveal the full value that distributed resources can provide to the electric power system (utility grid). This report looks at the functions that distributed resources can perform and examines the barriers to them. It then identifies a series of policy and operational approaches to promoting DR in wholesale markets. This report is one in the State Electricity Regulatory Policy and Distributed Resources series developed under contract to NREL (see Annual Technical Status Report of the Regulatory Assistance Project: September 2000-September 2001, NREL/SR-560-32733). Other titles in this series are: (1) Distributed Resource Distribution Credit Pilot Programs - Revealing the Value to Consumers and Vendors, NREL/SR-560-32499; (2) Distributed Resources and Electric System Reliability, NREL/SR-560-32498; (3) Distribution System Cost Methodologies for Distributed Generation, NREL/SR-560-32500; (4) Distribution System Cost Methodologies for Distributed Generation Appendices, NREL/SR-560-32501

  19. Incentives for an adequate, economic and reliable Swiss transmission grid. Final version

    International Nuclear Information System (INIS)

    Twomey, P.; Neuhoff, K.; Newbery, D.

    2006-11-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) discusses incentives necessary for the implementation of an adequate, economic and reliable Swiss electricity transmission grid. As Switzerland moves towards a more liberalised and competitive electricity market, an essential task of policy makers will be to ensure that incentives are in place for the construction, maintenance and operation of adequate, economic and reliable transmission infrastructure. As well as continuing to serve the domestic market, the location of Switzerland at the centre of Europe also means that policy should embrace opportunities in servicing the developing European Internal Market by providing transit and other services. Topics discussed include the economic evaluation of transmission investment proposals, regulated transmission investment, investments in transmission lines by power merchants, power auctions and congestion management as well as inter-TSO compensation mechanisms. European regulations and practice are discussed as are access questions and transmission charges. Developments in interconnection management and harmonisation are examined. The particular characteristics of the Swiss energy system, its prices and its legal frameworks are discussed. Cross-border trading and security of supply are also discussed

  20. Incentives for an adequate, economic and reliable Swiss transmission grid. Final version

    Energy Technology Data Exchange (ETDEWEB)

    Twomey, P.; Neuhoff, K.; Newbery, D.

    2006-11-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) discusses incentives necessary for the implementation of an adequate, economic and reliable Swiss electricity transmission grid. As Switzerland moves towards a more liberalised and competitive electricity market, an essential task of policy makers will be to ensure that incentives are in place for the construction, maintenance and operation of adequate, economic and reliable transmission infrastructure. As well as continuing to serve the domestic market, the location of Switzerland at the centre of Europe also means that policy should embrace opportunities in servicing the developing European Internal Market by providing transit and other services. Topics discussed include the economic evaluation of transmission investment proposals, regulated transmission investment, investments in transmission lines by power merchants, power auctions and congestion management as well as inter-TSO compensation mechanisms. European regulations and practice are discussed as are access questions and transmission charges. Developments in interconnection management and harmonisation are examined. The particular characteristics of the Swiss energy system, its prices and its legal frameworks are discussed. Cross-border trading and security of supply are also discussed

  1. Some reliability targets affecting the necessary provisions for in-service inspection and monitoring of LMFBR engineering components

    International Nuclear Information System (INIS)

    Bolt, P.R.

    1980-01-01

    The possible consequences of failure of primary and secondary sodium circuit components are discussed with particular reference to post incident fault diagnosis, remedial procedures and outage durations. The core support structures and steam generator units are identified as particularly important components in terms of economic consequence of their failure. Important safety considerations may also apply. Levels of reliability for core support and steam generator integrity, necessary to meet economic and certain safety criteria, are discussed and quantitative data is given. Possible failure and deterioration mechanisms which could result in unacceptable reductions in reliability are then identified for the core support and steam generator units. Following a consideration of the reliability targets and possible causes of loss of reliability, an appraisal is made of the necessary extent of in-service data to be obtained on component behaviour and condition. In-service inspection and monitoring methods that could be used to obtain this data are described. Consideration is given to UK and overseas inspection experience on LMFBR and other nuclear plant. (author)

  2. Some reliability targets affecting the necessary provisions for in-service inspection and monitoring of LMFBR engineering components

    Energy Technology Data Exchange (ETDEWEB)

    Bolt, P R [Fast Reactor Engineering, Plant Engineering Department, CEGB, Barnwood, Gloucester (United Kingdom)

    1980-11-01

    The possible consequences of failure of primary and secondary sodium circuit components are discussed with particular reference to post incident fault diagnosis, remedial procedures and outage durations. The core support structures and steam generator units are identified as particularly important components in terms of economic consequence of their failure. Important safety considerations may also apply. Levels of reliability for core support and steam generator integrity, necessary to meet economic and certain safety criteria, are discussed and quantitative data is given. Possible failure and deterioration mechanisms which could result in unacceptable reductions in reliability are then identified for the core support and steam generator units. Following a consideration of the reliability targets and possible causes of loss of reliability, an appraisal is made of the necessary extent of in-service data to be obtained on component behaviour and condition. In-service inspection and monitoring methods that could be used to obtain this data are described. Consideration is given to UK and overseas inspection experience on LMFBR and other nuclear plant. (author)

  3. Adoption of energy-efficient televisions for expanded off-grid electricity service

    Directory of Open Access Journals (Sweden)

    Won Young Park

    Full Text Available Even though they dominate the global television (TV market, light-emitting diode backlit liquid crystal display (LED-LCD TVs have received little attention for use with off-grid household-scale renewable energy systems, primarily because of high up-front costs. However, technological advances and price declines mean that these TVs can now provide the same level of electricity service as standard LED-LCD TVs offer but at lower total energy cost. Moreover, LED-LCD TVs are inherently direct-current (DC-powered devices and therefore well suited for use with off-grid solar home systems. We estimate that DC-powered energy-efficient LED-LCD TVs can decrease the retail purchase price of solar home systems by about 25% by allowing use of 50% smaller photovoltaics and battery capacities than would be needed for the same energy system to power a standard LED-LCD TV. We recommend that policies such as awards, bulk procurement, incentives, and energy labels be considered to facilitate the adoption of these energy-efficient TVs in off-grid settings. Keywords: DC television, TV energy efficiency, Electricity access, Off-grid electricity service, Cost-benefit analysis

  4. Learning from the blackouts. Transmission system security in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    none

    2005-07-01

    Electricity market reform has fundamentally changed the environment for maintaining reliable and secure power supplies. Growing inter-regional trade has placed new demands on transmission systems, creating a more integrated and dynamic network environment with new real-time challenges for reliable and secure transmission system operation. Despite these fundamental changes, system operating rules and practices remain largely unchanged. The major blackouts of 2003 and 2004 raised searching questions about the appropriateness of these arrangements. Management of system security needs to be transformed to maintain reliable electricity services in this more dynamic operating environment. These challenges raise fundamental issues for policymakers. This publication presents case studies drawn from recent large-scale blackouts in Europe, North America, and Australia. It concludes that a comprehensive, integrated policy response is required to avoid preventable large-scale blackouts in the future.

  5. 75 FR 26747 - U.S. Gas & Electric, Inc., Energy Services Providers, Inc., ESPI New England, Inc; Supplemental...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Docket Nos. ER10-1129-000; ER10-1130-000; ER10-1131-000] U.S. Gas & Electric, Inc., Energy Services Providers, Inc., ESPI New England, Inc... & Electric, Inc., Energy Services Providers, Inc., and ESPI New England, Inc.'s application for market-based...

  6. Electric propulsion reliability: Statistical analysis of on-orbit anomalies and comparative analysis of electric versus chemical propulsion failure rates

    Science.gov (United States)

    Saleh, Joseph Homer; Geng, Fan; Ku, Michelle; Walker, Mitchell L. R.

    2017-10-01

    With a few hundred spacecraft launched to date with electric propulsion (EP), it is possible to conduct an epidemiological study of EP's on orbit reliability. The first objective of the present work was to undertake such a study and analyze EP's track record of on orbit anomalies and failures by different covariates. The second objective was to provide a comparative analysis of EP's failure rates with those of chemical propulsion. Satellite operators, manufacturers, and insurers will make reliability- and risk-informed decisions regarding the adoption and promotion of EP on board spacecraft. This work provides evidence-based support for such decisions. After a thorough data collection, 162 EP-equipped satellites launched between January 1997 and December 2015 were included in our dataset for analysis. Several statistical analyses were conducted, at the aggregate level and then with the data stratified by severity of the anomaly, by orbit type, and by EP technology. Mean Time To Anomaly (MTTA) and the distribution of the time to (minor/major) anomaly were investigated, as well as anomaly rates. The important findings in this work include the following: (1) Post-2005, EP's reliability has outperformed that of chemical propulsion; (2) Hall thrusters have robustly outperformed chemical propulsion, and they maintain a small but shrinking reliability advantage over gridded ion engines. Other results were also provided, for example the differentials in MTTA of minor and major anomalies for gridded ion engines and Hall thrusters. It was shown that: (3) Hall thrusters exhibit minor anomalies very early on orbit, which might be indicative of infant anomalies, and thus would benefit from better ground testing and acceptance procedures; (4) Strong evidence exists that EP anomalies (onset and likelihood) and orbit type are dependent, a dependence likely mediated by either the space environment or differences in thrusters duty cycles; (5) Gridded ion thrusters exhibit both

  7. Electricity Networks: Infrastructure and Operations. Too complex for a resource?

    Energy Technology Data Exchange (ETDEWEB)

    Volk, Dennis

    2013-07-01

    Electricity security remains a priority of energy policy and continuous electrification will further enhance the importance in the years to come. Market liberalisation has brought substantial benefits to societies, including competition, innovation, more client-oriented services and the reduced needs for public expenditure. Further, the path of decarbonisation is a must but experiences with many new technologies and policies show their many implications on power systems. Electricity networks form the backbone of reliable and affordable power systems and also significantly support the inception of renewable generation. The importance of distribution and transmission networks has to be well understood by policy makers and regulators to maintain the sensitive balance within the policy triangle of reliability, affordability and sustainability as power systems rapidly change. Failures in choosing the right institutions and regulatory frameworks to operate and build networks will put the sensitive balance within the policy triangle at risk. ''Too complex for a resource?'' identifies the key challenges the electricity distribution and transmission networks face today and in the future. It further provides for best practice examples on institutional design choices and regulatory frameworks for sound network service provision but also highlights the importance of additional responses required. More market-based and dynamic frameworks for various system services, the growing need for active service participation of renewable generators and highly independent and transparent central operators seem to be at the heart of these responses. ''Too complex for a resource?'' finds that the answer to the challenges ahead is not always more infrastructure and that networks and the services they provide have to be regarded as equal part of the total power system. Thus, accurate and dynamic cost allocation can significantly support to transform

  8. Energy- and value added services in the electric power market in Sweden; Energi- och mervaerdestjaenster paa elmarknaden i Sverige

    Energy Technology Data Exchange (ETDEWEB)

    Matsson, Peter

    2000-03-01

    This report tries to give a comprehensive picture of the offerings of energy- and value added services on the deregulated Swedish electric power market. A compilation of the service offerings from some 50 electric utilities is given. Market movements within deregulated sectors are treated with special emphasis on the electric power business.

  9. 78 FR 65978 - Application to Export Electric Energy; Brookfield Energy Marketing Inc.

    Science.gov (United States)

    2013-11-04

    ... Energy Marketing Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Brookfield Energy Marketing Inc. (BEMI) has applied to renew its authority... President of Legal Services and General Counsel, Brookfield Energy Marketing Inc., 480 de la Cite Blvd...

  10. Customer prime s choice between quality and price of electric service. Denryoku hinshitsu to kakaku ni taisuru juyoka no sentaku. ; Ogata computerter dot user ni okeru back-up dengen kiki sentaku no suryo bunseki

    Energy Technology Data Exchange (ETDEWEB)

    Fujii, Y.; Matsukawa, I.

    1990-03-01

    This study is done for the purpose of numerically analyzing how customers react to make their choice between quality and price, as well as to evaluating the marketability of the new electric service differentiated by quality, on the assumption that electric utility is capable of providing the multi-product of the service with various combinations instead of the conventional single product between price and quality. An analysis was made for the customers like the large-scale computer users those who attach importance to quality. As for the method of the analysis, the choice (the introduction of emergency power source or uninterruptible power system) which have been actually done by the customers for the following two conditions, were used as the model of the analysis: The one was the standard of the requirements for the quality of electric power, of which requirements were composed of the two factors, such as the reliability on power supply and momentary voltage drop; The other was the cost (purchased power price plus investment by consumers for back-up power system) necessary to maintain the quality. Consequently, it was found that in order to heighten the competitiveness for the competition in electricity market, electric utility had to establish their service rate corresponding to the load, as well as that the quality was a important strategic factor for them. 30 refs., 10 figs., 9 tabs.

  11. The prerequisite for competition in the restructured wholesale Saudi electricity market

    International Nuclear Information System (INIS)

    Al-Muhawesh, Tareq A.; Qamber, Isa S.

    2008-01-01

    Protection of customers against monopoly is the first and main objective of the Saudi Electricity and Co-generation Regulatory Authority (ECRA). The second important objective, as recommended by the present study, is regulating natural monopoly businesses [Saudi electricity national grid (SENG) and Saudi electricity distribution (SED)] in addition to promoting real competition in competitive businesses [power supply providers (PSPs) and customer service providers (CSPs)]. Another four main objectives of ECRA are to promote the efficient use of energy and natural resources, to ensure a reasonable rate of return for PSPs and CSPs and at the same time to be fair to end-users, to ensure reasonable charges to SENG and SED services to be adequate for them to run the organization in a break-even manner and to maintain the system's security and reliability. The present paper discusses the way to improve and restructure the Saudi electricity market

  12. Reliability and Validity of SERVQUAL Scores Used To Evaluate Perceptions of Library Service Quality.

    Science.gov (United States)

    Thompson, Bruce; Cook, Colleen

    Research libraries are increasingly supplementing collection counts with perceptions of service quality as indices of status and productivity. The present study was undertaken to explore the reliability and validity of scores from the SERVQUAL measurement protocol (A. Parasuraman and others, 1991), which has previously been used in this type of…

  13. Beyond redundancy how geographic redundancy can improve service availability and reliability of computer-based systems

    CERN Document Server

    Bauer, Eric; Eustace, Dan

    2012-01-01

    "While geographic redundancy can obviously be a huge benefit for disaster recovery, it is far less obvious what benefit is feasible and likely for more typical non-catastrophic hardware, software, and human failures. Georedundancy and Service Availability provides both a theoretical and practical treatment of the feasible and likely benefits of geographic redundancy for both service availability and service reliability. The text provides network/system planners, IS/IT operations folks, system architects, system engineers, developers, testers, and other industry practitioners with a general discussion about the capital expense/operating expense tradeoff that frames system redundancy and georedundancy"--

  14. Electric Vehicle Based Battery Storages for Future Power System Regulation Services

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    supplying the reserve power requirements. This limited regulation services from conventional generators in the future power system calls for other new reserve power solutions like Electric Vehicle (EV) based battery storages. A generic aggregated EV based battery storage for long-term dynamic load frequency...

  15. Assessing reliability in energy supply systems

    International Nuclear Information System (INIS)

    McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

    2007-01-01

    Reliability has always been a concern in the energy sector, but concerns are escalating as energy demand increases and the political stability of many energy supply regions becomes more questionable. But how does one define and measure reliability? We introduce a method to assess reliability in energy supply systems in terms of adequacy and security. It derives from reliability assessment frameworks developed for the electricity sector, which are extended to include qualitative considerations and to be applicable to new energy systems by incorporating decision-making processes based on expert opinion and multi-attribute utility theory. The method presented here is flexible and can be applied to any energy system. To illustrate its use, we apply the method to two hydrogen pathways: (1) centralized steam reforming of imported liquefied natural gas with pipeline distribution of hydrogen, and (2) on-site electrolysis of water using renewable electricity produced independently from the electricity grid

  16. I.T., Optimized energy systems and new customer services. The deregulated electricity market and the Ronneby case

    Energy Technology Data Exchange (ETDEWEB)

    Bergstroem, U

    1999-03-01

    This thesis concerns the utilization of information technology to obtain optimized energy systems and the increasing dependence on IT applications within the power industry in general, and especially within electricity. Based on energy system optimizations, industrial simulations, interviews and literature surveys, the thesis concludes that information technology is a condition for optimized energy systems. Through large-scale load control, enabled by IT, the energy system cost for supplying a local energy system can be reduced considerably. Diurnal energy system optimizations further illustrate the increased utilization of load control, accentuated, when customers are exposed to the variations of the spot market price. Thereby, the increased need for load management on a deregulated market, where real time pricing is applied, is mirrored. However, given the boundary conditions of the deregulated electricity market, optimization of energy systems is no condition for competitiveness within electricity sales. This study also points out that, apart from industrial customers, other market actors, like electricity sales companies and local distributors, have few incentives to introduce load control. Distributors mainly lose money on power reducing measures, except for when there are distribution limitations. Neither do electricity sales companies make short-term earnings from large-scale load control. The combination with small economic savings for residential customers make the financing of large-scale load control problematic. Regarding electricity sales companies, increased IT utilization is observed to enable marketing and service offerings on the Internet, and IT-based value-added services (VAS). For pure communication services, the sales companies utilize IT to offer telephone services (analogue technique) and Internet access, the latter is sometimes performed on the electricity grid. Extended IT-systems for customer administration, customer service, and market

  17. High pressure, high current, low inductance, high reliability sealed terminals

    Science.gov (United States)

    Hsu, John S [Oak Ridge, TN; McKeever, John W [Oak Ridge, TN

    2010-03-23

    The invention is a terminal assembly having a casing with at least one delivery tapered-cone conductor and at least one return tapered-cone conductor routed there-through. The delivery and return tapered-cone conductors are electrically isolated from each other and positioned in the annuluses of ordered concentric cones at an off-normal angle. The tapered cone conductor service can be AC phase conductors and DC link conductors. The center core has at least one service conduit of gate signal leads, diagnostic signal wires, and refrigerant tubing routed there-through. A seal material is in direct contact with the casing inner surface, the tapered-cone conductors, and the service conduits thereby hermetically filling the interstitial space in the casing interior core and center core. The assembly provides simultaneous high-current, high-pressure, low-inductance, and high-reliability service.

  18. Implementing eco friendly highly reliable upload feature using multi 3G service

    Science.gov (United States)

    Tanutama, Lukas; Wijaya, Rico

    2017-12-01

    The current trend of eco friendly Internet access is preferred. In this research the understanding of eco friendly is minimum power consumption. The devices that are selected have operationally low power consumption and normally have no power consumption as they are hibernating during idle state. To have the reliability a router of a router that has internal load balancing feature will provide the improvement of previous research on multi 3G services for broadband lines. Previous studies emphasized on accessing and downloading information files from Public Cloud residing Web Servers. The demand is not only for speed but high reliability of access as well. High reliability will mean mitigating both direct and indirect high cost due to repeated attempts of uploading and downloading the large files. Nomadic and mobile computer users need viable solution. Following solution for downloading information has been proposed and tested. The solution is promising. The result is now extended to providing reliable access line by means of redundancy and automatic reconfiguration for uploading and downloading large information files to a Web Server in the Cloud. The technique is taking advantage of internal load balancing feature to provision a redundant line acting as a backup line. A router that has the ability to provide load balancing to several WAN lines is chosen. The WAN lines are constructed using multiple 3G lines. The router supports the accessing Internet with more than one 3G access line which increases the reliability and availability of the Internet access as the second line immediately takes over if the first line is disturbed.

  19. Maui Smart Grid Demonstration Project Managing Distribution System Resources for Improved Service Quality and Reliability, Transmission Congestion Relief, and Grid Support Functions

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-30

    The Maui Smart Grid Project (MSGP) is under the leadership of the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii at Manoa. The project team includes Maui Electric Company, Ltd. (MECO), Hawaiian Electric Company, Inc. (HECO), Sentech (a division of SRA International, Inc.), Silver Spring Networks (SSN), Alstom Grid, Maui Economic Development Board (MEDB), University of Hawaii-Maui College (UHMC), and the County of Maui. MSGP was supported by the U.S. Department of Energy (DOE) under Cooperative Agreement Number DE-FC26-08NT02871, with approximately 50% co-funding supplied by MECO. The project was designed to develop and demonstrate an integrated monitoring, communications, database, applications, and decision support solution that aggregates renewable energy (RE), other distributed generation (DG), energy storage, and demand response technologies in a distribution system to achieve both distribution and transmission-level benefits. The application of these new technologies and procedures will increase MECO’s visibility into system conditions, with the expected benefits of enabling more renewable energy resources to be integrated into the grid, improving service quality, increasing overall reliability of the power system, and ultimately reducing costs to both MECO and its customers.

  20. Evolución de los métodos de evaluación de la confiabilidad para redes eléctricas de distribución; Evolution of reliability assessment methods for electrical distribution networks

    Directory of Open Access Journals (Sweden)

    Eduardo Sierra Gil

    2011-05-01

    Full Text Available Este trabajo pretende ofrecer una breve panorámica sobre la evolución de los métodos de evaluación de la confiabilidad y las especificidades de los mismos durante la caracterización de redes eléctricas de distribución y mostrar como la utilización de uno u otro depende no solo de de la disponibilidad de datos y la existencia o no de regulaciones para la continuidad del servicio eléctrico, sino que además depende del enfoque que se le de al estudio en cuestión, selección de variantes durante el diseño, opciones de mejora de la confiabilidad durante la explotación o gestión de mantenimiento.  This paper intends to offer a brief panoramic about the evolution of the reliability assessment methods and the specificities of the same ones during the characterization of the electrical distribution networks and to show how the utilization of either method not depends only of availability of data and the existence or not of regulations for the continuity of electrical service, rather besides depends of the approach to reliability studies in point: selection of variants during the design, reliability improving options during the exploitations or maintenance management.

  1. A Fast and Reliable Broadcast Service for LTE-Advanced Exploiting Multihop Device-to-Device Transmissions

    Directory of Open Access Journals (Sweden)

    Giovanni Nardini

    2017-11-01

    Full Text Available Several applications, from the Internet of Things for smart cities to those for vehicular networks, need fast and reliable proximity-based broadcast communications, i.e., the ability to reach all peers in a geographical neighborhood around the originator of a message, as well as ubiquitous connectivity. In this paper, we point out the inherent limitations of the LTE (Long-Term Evolution cellular network, which make it difficult, if possible at all, to engineer such a service using traditional infrastructure-based communications. We argue, instead, that network-controlled device-to-device (D2D communications, relayed in a multihop fashion, can efficiently support this service. To substantiate the above claim, we design a proximity-based broadcast service which exploits multihop D2D. We discuss the relevant issues both at the UE (User Equipment, which has to run applications, and within the network (i.e., at the eNodeBs, where suitable resource allocation schemes have to be enforced. We evaluate the performance of a multihop D2D broadcasting using system-level simulations, and demonstrate that it is fast, reliable and economical from a resource consumption standpoint.

  2. Power transformer reliability modelling

    NARCIS (Netherlands)

    Schijndel, van A.

    2010-01-01

    Problem description Electrical power grids serve to transport and distribute electrical power with high reliability and availability at acceptable costs and risks. These grids play a crucial though preferably invisible role in supplying sufficient power in a convenient form. Today’s society has

  3. 46 CFR 169.619 - Reliability.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Reliability. 169.619 Section 169.619 Shipping COAST... Electrical Steering Systems § 169.619 Reliability. (a) Except where the OCMI judges it impracticable, the... be below that necessary for the safe navigation of the vessel. (c) The strength and reliability of...

  4. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  5. Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2012-01-01

    Full Text Available The paper considers two schemes of the urban distributive electric network for supply of the second and third category consumers for whom indicators of reliability have been determined.As for a network scheme of the 2nd category it has been determined that while installing low-oil and vacuum switches at a distributive point the most remote transformer substation has the highest non-availability  factor which is higher of the corresponding non-availability  factor of the nearest transformer substation by 1,21–1,23 fold  accordingly.As for a network scheme of the 3rd category consumers it has been obtained the data that reliability of consumers receiving supply from bus-bars of transformer substations with 0,38 kW voltage changes  significantly (by 1,2–1,9-fold while changing a breakpoint of the network with 10 kW voltage.

  6. On the complex analysis of the reliability, safety, and economic efficiency of atomic electric power stations

    International Nuclear Information System (INIS)

    Emel'yanov, I.Ya.; Klemin, A.I.; Polyakov, E.F.

    1977-01-01

    The problem is posed of effectively increasing the engineering performance of nuclear electric power stations (APS). The principal components of the engineering performance of modern large APS are considered: economic efficiency, radiation safety, reliability, and their interrelationship. A nomenclature is proposed for the quantitative indices which most completely characterize the enumerated properties and are convenient for the analysis of the engineering performance. The urgent problem of developing a methodology for the complex analysis and optimization of the principal performance components is considered; this methodology is designed to increase the efficiency of the work on high-performance competitive APS. The principle of complex optimization of the reliability, safety, and economic-efficiency indices is formulated; specific recommendations are made for the practical realization of this principle. The structure of the complex quantiative analysis of the enumerated performance components is given. The urgency and promise of the complex approach to solving the problem of APS optimization is demonstrated, i.e., the solution of the problem of creating optimally reliable, fairly safe, and maximally economically efficient stations

  7. A model for reliability avaliation of the electrical supply source of the 1A3 and 1A4 control rods assemblies of Angra I reactor

    International Nuclear Information System (INIS)

    Yang, T.

    1978-01-01

    The reliability of the electrical power supply to the 4.16KV buses for the safety system operation of a nuclear power plant was studied. Particularly, Angra Unit I system was focused. Initially, reliability of each electrical supply source was estimated. Using a probabilistic approach based on the Markov processes, the system reliability was evaluated in terms of frequency and duration of loss of power supply and of the system failure probability evolution when one or more sources remained unavailable. Based on these results, certain reactor operating rules were proposed concerning later shutdown of the plant without compromising the nuclear reactor safety. A sensitivity analysis was also performed to show the different reliability parameter influences on final results. This analysis showed that the diesel system performs an important role in the power supply for a nuclear power plant [pt

  8. Improving electrical power systems reliability through locally controlled distributed curtailable load

    Science.gov (United States)

    Dehbozorgi, Mohammad Reza

    2000-10-01

    Improvements in power system reliability have always been of interest to both power companies and customers. Since there are no sizable electrical energy storage elements in electrical power systems, the generated power should match the load demand at any given time. Failure to meet this balance may cause severe system problems, including loss of generation and system blackouts. This thesis proposes a methodology which can respond to either loss of generation or loss of load. It is based on switching of electric water heaters using power system frequency as the controlling signal. The proposed methodology encounters, and the thesis has addressed, the following associated problems. The controller must be interfaced with the existing thermostat control. When necessary to switch on loads, the water in the tank should not be overheated. Rapid switching of blocks of load, or chattering, has been considered. The contributions of the thesis are: (A) A system has been proposed which makes a significant portion of the distributed loads connected to a power system to behave in a predetermined manner to improve the power system response during disturbances. (B) The action of the proposed system is transparent to the customers. (C) The thesis proposes a simple analysis for determining the amount of such loads which might be switched and relates this amount to the size of the disturbances which can occur in the utility. (D) The proposed system acts without any formal communication links, solely using the embedded information present system-wide. (E) The methodology of the thesis proposes switching of water heater loads based on a simple, localized frequency set-point controller. The thesis has identified the consequent problem of rapid switching of distributed loads, which is referred to as chattering. (F) Two approaches have been proposed to reduce chattering to tolerable levels. (G) A frequency controller has been designed and built according to the specifications required to

  9. Service to the Electric Utility Industry by the Ford Nuclear Reactor, University of Michigan

    International Nuclear Information System (INIS)

    Burn, R.R.; Simpson, P.A.; Cook, G.M.

    1993-01-01

    Since 1977, the staff of the University of Michigan's Ford Nuclear Reactor has been providing irradiation, testing, analytical, and training services to electric utilities and to suppliers of the nuclear electric utility industry. This paper discusses the reactor's irradiation facilities; reactor programs and utilization; materials testing programs; neutron activation analysis activities; and training programs conducted

  10. Investment in electricity for development. Chapter 5

    International Nuclear Information System (INIS)

    2007-01-01

    In this short chapter, we discuss first the role of reliable and affordable electricity in underpinning economic development and in enabling the achievement of the MDGs in health and education. We then review some estimates of investment requirements for energy needs in sub Saharan Africa. In the next section we discuss briefly how financing sources for investment in the sector in sub-Saharan Africa are constrained. In the main and final section we list priority policies, which, if implemented, can help overcome these constraints so that increased amounts of investment begin to flow into the sector, resulting in the desired improvement in electricity services

  11. Photovoltaic Module Reliability Workshop 2010: February 18-19, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, J.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  12. Photovoltaic Module Reliability Workshop 2011: February 16-17, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  13. Photovoltaic Module Reliability Workshop 2013: February 26-27, 2013

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2013-10-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  14. Photovoltaic Module Reliability Workshop 2014: February 25-26, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2014-02-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  15. Puget Sound area electric reliability plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  16. Reliability of high-voltage pulse capacitors operating in large energy storages

    International Nuclear Information System (INIS)

    Kuchinskij, G.S.; Fedorova, V.S.; Shilin, O.V.

    1982-01-01

    To improve the reliability of pulse capacitors operating in capacitive energy storages, processes, resulting in break-down of capacitor insulation were investigated. A statistic model of failures was constructed and reliability of real capacitors, functioning at operating electric intensity Usub(oper) equal 70 kV/mm and at elevated intensity 90 kV/mm was calculated. Results of testing the IK50-ZU4 capacitor are given. The form of the capacitor service life distribution function was specified. To provide and confirm the assigned capacitor reliability, it is necessary to speed up tests at a higher voltage (1.3-1.5) Usub(oper). To improve the capacitor reliability, it is advisable to conduct acceptance tests, which include hold at increased constant voltage (1.3-1.5) Usub(oper) during 1-3 min and the effect of pulses of increased voltage (1.2-1.3) Usub(oper) with the pulse shape corresponding to operating conditions

  17. Estimating the option value of a non-firm electricity tariff

    International Nuclear Information System (INIS)

    Moore, J.; Horii, B.; Price, S.; Olson, A.; Woo, C.K.

    2010-01-01

    We estimate the option value of a non-firm electricity tariff commonly used by a local distribution company (LDC) in its electricity demand response program. This option value captures the benefit that a LDC enjoys from not serving an end-use load during high-price hours in a wholesale electricity market. It is conservative in that it does not include the cost savings in meeting the LDC's resource adequacy requirement or deferring transmission and distribution (T and D) investments necessary for delivering reliable service. Illustrated by a Northern California example, our two-pronged approach entails (a) a set of summer monthly market price regressions to forecast daily spot price distributions that incorporate uncertainty in natural gas price and weather; and (b) a simulation exercise to quantify the tariff's value under a specific design. The results indicate that a non-firm service tariff can have varying option value estimates that are highly sensitive to the tariff's design, and that an incentive payment based on the option value alone is likely insufficient to attract customer participation in a non-firm service program. (author)

  18. Reliability of eddy current examination of steam generator tubes

    International Nuclear Information System (INIS)

    Birks, A.S.; Ferris, R.H.; Doctor, P.G.; Clark, R.A.; Spanner, G.E.

    1985-04-01

    A unique study of nondestructive examination reliability is underway at the Pacific Northwest Laboratory under US Nuclear Regulatory Commission sponsorship. Project participants include the Electric Power Research Institute and consortiums from France, Italy, and Japan. This study group has conducted a series of NDE examinations of tubes from a retired-from-service steam generator, using commercially available multifrequency eddy current equipment and ASME procedures. The examination results have been analyzed to identify factors contributing to variations in NDE inspection findings. The reliability of these examinations will then be validated by destructive analyses of the steam generator tubes. The program is expected to contribute to development of a model for steam generator inservice inspection sampling plans and inspection periods, as well as to improved regulatory guidelines for tube plugging

  19. Time-dependent reliability analysis and condition assessment of structures

    International Nuclear Information System (INIS)

    Ellingwood, B.R.

    1997-01-01

    Structures generally play a passive role in assurance of safety in nuclear plant operation, but are important if the plant is to withstand the effect of extreme environmental or abnormal events. Relative to mechanical and electrical components, structural systems and components would be difficult and costly to replace. While the performance of steel or reinforced concrete structures in service generally has been very good, their strengths may deteriorate during an extended service life as a result of changes brought on by an aggressive environment, excessive loading, or accidental loading. Quantitative tools for condition assessment of aging structures can be developed using time-dependent structural reliability analysis methods. Such methods provide a framework for addressing the uncertainties attendant to aging in the decision process

  20. Emissions impacts and benefits of plug-in hybrid electric vehicles and vehicle-to-grid services.

    Science.gov (United States)

    Sioshansi, Ramteen; Denholm, Paul

    2009-02-15

    Plug-in hybrid electric vehicles (PHEVs) have been promoted as a potential technology to reduce emissions of greenhouse gases and other pollutants by using electricity instead of petroleum, and byimproving electric system efficiency by providing vehicle-to-grid (V2G) services. We use an electric power system model to explicitly evaluate the change in generator dispatches resulting from PHEV deployment in the Texas grid, and apply fixed and non-parametric estimates of generator emissions rates, to estimate the resulting changes in generation emissions. We find that by using the flexibility of when vehicles may be charged, generator efficiency can be increased substantially. By changing generator dispatch, a PHEVfleet of up to 15% of light-duty vehicles can actually decrease net generator NOx emissions during the ozone season, despite the additional charging load. By adding V2G services, such as spinning reserves and energy storage, CO2, SO2, and NOx emissions can be reduced even further.

  1. Quality of service in the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Knijp, J.; Zwart, T. de; Frenken, R.M.L. [KEMA (Netherlands)

    1997-12-31

    Growing competition between utilities, changing legislation and increased usage of sensitive and disturbing end-user equipment, are some reasons for growing attention for the customers` view towards the product electricity and its related services. This growing interest certainly does not mean that the technical quality level always has to be increased. This depends mainly on the requirements and expectations of the customers. Achieving a reliable power supply at high quality level requires enormous investments. For electric utilities, it is important to know how the customers value the delivered products and services in order to determine if the investments are proportionally. Utilities need new tools and techniques to search for an optimal quality level for each customer. Product differentiation and additional services can be developed if the right information is available. In 1994 KEMA has started a project called: Quality of service. During the project different methods and techniques have been developed. In this paper three tools will be presented. The ``customer simulator``, the Dutch power quality monitoring programme and the ``PSQ-indicator``. (Author)

  2. Reliability of Power Units in Poland and the World

    Directory of Open Access Journals (Sweden)

    Józef Paska

    2015-09-01

    Full Text Available One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland, NERC (North American Electric Reliability Corporation – USA, and WEC (World Energy Council. Deficiencies and the lack of a unified national system for collecting and processing electric power equipment unavailability data are also indicated.

  3. Reliability through markets in Ontario : submission by the Independent Electricity Market Operator to the Minister of Energy's Consultation Process

    International Nuclear Information System (INIS)

    2003-01-01

    For the past five years, Ontario has invested $1 billion to restructure and open its electricity market to competition. In recent months, and in response to residential consumers pricing concerns, the Independent Electricity Market Operator (IMO) transferred credits to local distribution companies allowing them to issue $75 rebates to all affected customers as of December 1, 2002, and to bill low-volume and other designated customers at a rate of 4.3 cents per kilowatt hour for the commodity portion of their bills. This report addresses the concern that price responsiveness will be lost for those parts of the market with fixed prices. It was noted that the reliability of the power system could be placed at risk if the range of customers with fixed prices is broadened. Fixed prices would also jeopardize the province's ability to attract new supply and enhance competition in the electricity sector. The IMO believes that price responsiveness in the wholesale market is crucial to the reliability of the electricity system and recommends that a plan for any additional fixed pricing should include a clearly defined phase-out over the period ending in 2006 as new supply comes on-line. The IMO emphasizes that the lack of price responsiveness to the market, particularly in peak energy demand periods, is equivalent to adding hundreds of MW to the load. The report presents lessons learned in other jurisdictions and highlights noteworthy considerations such as the market power mitigation agreement, improving competition, a phased-in approach, and demand side initiatives

  4. Charging Schedule for Electric Vehicles in Danish Residential Distribution Grids

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Huang, Shaojun; Bak-Jensen, Birgitte

    2015-01-01

    energy sources like wind in power systems. The EV batteries could be used to charge during periods of excess electricity production from wind power and reduce the charging rate or discharge on deficit of power in the grid, supporting system stability and reliability. By providing such grid services......The prospects of Electric Vehicles (EVs) in providing clean transportation and supporting renewable electricity is widely discussed in sustainable energy forums worldwide. The battery storage of EVs could be used to address the variability and unpredictability of electricity produced from renewable......, the vehicle owner, vehicle fleet operator and other parties involved in the process could economically benefit from the process. This paper investigates an optimal EV charging plan in Danish residential distribution grids in view of supporting high volumes of wind power in electricity grids. The results...

  5. The politics of power: Electricity reform in India

    International Nuclear Information System (INIS)

    Joseph, Kelli L.

    2010-01-01

    Ongoing theft, corruption, and an artificially decreased pricing structure have made it nearly impossible for the state utilities in India to improve power service. As a result, industrial consumers across India exit the state-run system and rely on their own on-site power generation in order to ensure a consistent and reliable source of electricity. The 2003 Electricity Act encourages further power production from these captive plants through its open access clause. By encouraging the growth of these captive power plants, politicians in India set up a dual-track economy, whereby state-run and market-run production exist side-by-side. This strategy allows politicians to encourage private sector involvement in the electricity market, without jeopardizing the support of key political constituencies at the state level.

  6. Design for Reliability of Power Electronic Systems

    DEFF Research Database (Denmark)

    Wang, Huai; Ma, Ke; Blaabjerg, Frede

    2012-01-01

    Advances in power electronics enable efficient and flexible processing of electric power in the application of renewable energy sources, electric vehicles, adjustable-speed drives, etc. More and more efforts are devoted to better power electronic systems in terms of reliability to ensure high......). A collection of methodologies based on Physics-of-Failure (PoF) approach and mission profile analysis are presented in this paper to perform reliability-oriented design of power electronic systems. The corresponding design procedures and reliability prediction models are provided. Further on, a case study...... on a 2.3 MW wind power converter is discussed with emphasis on the reliability critical components IGBTs. Different aspects of improving the reliability of the power converter are mapped. Finally, the challenges and opportunities to achieve more reliable power electronic systems are addressed....

  7. Electrical substation service-area estimation using Cellular Automata: An initial report

    Energy Technology Data Exchange (ETDEWEB)

    Fenwick, J.W.; Dowell, L.J.

    1998-07-01

    The service areas for electric power substations can be estimated using a Cellular Automata (CA) model. The CA model is a discrete, iterative process whereby substations acquire service area by claiming neighboring cells. The service area expands from a substation until a neighboring substation service area is met or the substation`s total capacity or other constraints are reached. The CA-model output is dependent on the rule set that defines cell interactions. The rule set is based on a hierarchy of quantitative metrics that represent real-world factors such as land use and population density. Together, the metrics determine the rate of cell acquisition and the upper bound for service area size. Assessing the CA-model accuracy requires comparisons to actual service areas. These actual service areas can be extracted from distribution maps. Quantitative assessment of the CA-model accuracy can be accomplished by a number of methods. Some are as simple as finding the percentage of cells predicted correctly, while others assess a penalty based on the distance from an incorrectly predicted cell to its correct service area. This is an initial report of a work in progress.

  8. 78 FR 44909 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Science.gov (United States)

    2013-07-25

    ...\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242...-002-WECC-2 (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and... (Technical Information), Office of Electric Reliability, Division of Reliability Standards, Federal Energy...

  9. Multidisciplinary System Reliability Analysis

    Science.gov (United States)

    Mahadevan, Sankaran; Han, Song; Chamis, Christos C. (Technical Monitor)

    2001-01-01

    The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code, developed under the leadership of NASA Glenn Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multidisciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

  10. Power Electronics Packaging Reliability | Transportation Research | NREL

    Science.gov (United States)

    Packaging Reliability Power Electronics Packaging Reliability A photo of a piece of power electronics laboratory equipment. NREL power electronics packaging reliability research investigates the electronics packaging around a semiconductor switching device determines the electrical, thermal, and

  11. Benchmarking and incentive regulation of quality of service: an application to the UK electricity distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Giannakis, Dimitrios [Department of Physics, University of Chicago, Chicago (United States); Jamasb, Tooraj [Department of Applied Economics, University of Cambridge, Sidgwick Avenue, Austin Robinson Building, Cambridge, CB3 9DE (United Kingdom)]. E-mail: tooraj.jamasb@econ.cam.ac.uk; Pollitt, Michael [Judge Institute of Management, University of Cambridge, Cambridge (United Kingdom)

    2005-11-01

    Quality of service has emerged as an important issue in post-reform regulation of electricity distribution networks. Regulators have employed partial incentive schemes to promote cost saving, investment efficiency, and service quality. This paper presents a quality-incorporated benchmarking study of the electricity distribution utilities in the UK between 1991/92 and 1998/99. We calculate technical efficiency of the utilities using Data Envelopment Analysis technique and productivity change over time using quality-incorporated Malmquist indices. We find that cost-efficient firms do not necessarily exhibit high service quality and that efficiency scores of cost-only models do not show high correlation with those of quality-based models. The results also show that improvements in service quality have made a significant contribution to the sector's total productivity change. In addition, we show that integrating quality of service in regulatory benchmarking is preferable to cost-only approaches.

  12. Benchmarking and incentive regulation of quality of service: an application to the UK electricity distribution networks

    International Nuclear Information System (INIS)

    Giannakis, Dimitrios; Jamasb, Tooraj; Pollitt, Michael

    2005-01-01

    Quality of service has emerged as an important issue in post-reform regulation of electricity distribution networks. Regulators have employed partial incentive schemes to promote cost saving, investment efficiency, and service quality. This paper presents a quality-incorporated benchmarking study of the electricity distribution utilities in the UK between 1991/92 and 1998/99. We calculate technical efficiency of the utilities using Data Envelopment Analysis technique and productivity change over time using quality-incorporated Malmquist indices. We find that cost-efficient firms do not necessarily exhibit high service quality and that efficiency scores of cost-only models do not show high correlation with those of quality-based models. The results also show that improvements in service quality have made a significant contribution to the sector's total productivity change. In addition, we show that integrating quality of service in regulatory benchmarking is preferable to cost-only approaches

  13. Reliability of Power Units in Poland and the World

    OpenAIRE

    Józef Paska

    2015-01-01

    One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland), NERC (North American Electric Reliability Corporation – USA), ...

  14. 78 FR 63036 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2013-10-23

    ... Reliability Standards for the Bulk Power System, 130 FERC ] 61,200 (2010). \\8\\ Mandatory Reliability Standards... electric system operations across normal and contingency conditions. We also find that Reliability Standard... Reliability Standards for the Bulk Power System, 131 FERC ] 61,231 at P 21. Comments 24. NERC supports the...

  15. Environmental assessment for the electric utility system distribution, replacements and upgrades at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    1992-04-01

    This Environmental Assessment evaluates the environmental effects resulting from the distribution of new electrical service, replacement of inadequate or aging equipment, and upgrade of the existing electrical utility system at Lawrence Livermore National Laboratory. The projects assessed herein do not impact cultural or historic resources, sensitive habitats or wetlands and are not a source of air emissions. The potential environmental effects that do result from the action are fugitive dust and noise from construction and the disposal of potentially contaminated soil removed from certain limited areas of the LLNL site as a result of trenching for underground transmission lines. The actions described in this assessment represent an improved safety and reliability to the existing utility system. Inherent in the increased reliability and upgrades is a net increase in electrical capacity, with future expansion reserve. As with any electrical device, the electrical utility system has associated electric and magnetic fields that present a potential source of personnel exposure. The potential is not increased, however, beyond that which already exists for the present electrical utility system

  16. Photovoltaic Module Reliability Workshop 2012: February 28 - March 1, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  17. INCREASING RELIABILITY OF STEPPED AUTOMATIC STARTING AND RHEOSTAT BREAKING SYSTEM OF ELECTRIC TRAINS ER9T AND EPL9T

    Directory of Open Access Journals (Sweden)

    N. H. Visin

    2010-06-01

    Full Text Available The article examines transitional processes in the power circuit of tractive motors and their influence on the work of stepped automatic starting of electric trains ER9T and EPL9T. The recommendations for increasing the reliability of operation of multiple-unit rolling stock are proposed.

  18. Advancing electric-vehicle development with pure-lead-tin battery technology

    Science.gov (United States)

    O'Brien, W. A.; Stickel, R. B.; May, G. J.

    Electric-vehicle (EV) development continues to make solid progress towards extending vehicle range, reliability and ease of use, aided significantly by technological advances in vehicle systems. There is, however, a widespread misconception that current battery technologies are not capable of meeting even the minimum user requirements that would launch EVs into daily use. Existing pure-lead-tin technology is moving EVs out of research laboratories and onto the streets, in daily side-by-side operation with vehicles powered by conventional gasoline and alternative fuels. This commercially available battery technology can provide traffic-compatible performance in a reliable and affordable manner, and can be used for either pure EVs or hybrid electric vehicles (HEVs). Independent results obtained when applying lead-tin batteries in highly abusive conditions, both electrically and environmentally, are presented. The test fleet of EVs is owned and operated by Arizona Public Service (APS), an electric utility in Phoenix, AZ, USA. System, charger and battery development will be described. This gives a single charge range of up to 184 km at a constant speed of 72 km h -1, and with suitable opportunity charging, a 320 km range in a normal 8 h working day.

  19. 18 CFR 39.11 - Reliability reports.

    Science.gov (United States)

    2010-04-01

    ... Electric Reliability Organization shall conduct assessments of the adequacy of the Bulk-Power System in... assessments as determined by the Commission of the reliability of the Bulk-Power System in North America and... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reliability reports. 39...

  20. Reliability data book

    International Nuclear Information System (INIS)

    Bento, J.P.; Boerje, S.; Ericsson, G.; Hasler, A.; Lyden, C.O.; Wallin, L.; Poern, K.; Aakerlund, O.

    1985-01-01

    The main objective for the report is to improve failure data for reliability calculations as parts of safety analyses for Swedish nuclear power plants. The work is based primarily on evaluations of failure reports as well as information provided by the operation and maintenance staff of each plant. In the report are presented charts of reliability data for: pumps, valves, control rods/rod drives, electrical components, and instruments. (L.E.)

  1. Understanding the Public Service Obligation in the Electricity Sector. Lessons for the Contracting Parties of the Energy Community Treaty

    Energy Technology Data Exchange (ETDEWEB)

    Karova, R. [Energy Community Secretariat, Vienna (Austria)

    2012-01-15

    The paper underlines that the EU energy acquis does not simply require the Contracting Parties to the Energy Community Treaty to liberalize their electricity markets, but it also provides for a 'safety net' to ensure the available of public services through the imposition of Public Service Obligations (PSO). Nevertheless, the paper points out that the present understanding of the PSOs in the Contracting Parties is not in compliance with the conditions provided byArtide 3 of the Electricity Directive. Therefore, it includes some policy recommendations and a proposal for introducing a duty of notification, which should be instructive for the Contracting Parties to improve their understanding of PSO in line with EU law, by thus effectively safeguarding the availability of public services in the electricity sector to their citizens without jeopardizing the effective electricity market liberalization.

  2. On the bill on modernization and development of electricity public service; Le projet de loi relatif a la modernisation et au developpement du service public de l'electricite (no. 1253)

    Energy Technology Data Exchange (ETDEWEB)

    Dumont, Jean-Louis [ed.] [Commission des Finances, de l' Economie generale et du Plan, Assemblee Nationale, Paris (France)

    1999-02-10

    This document is a report presented on behalf of Commission of Finances, General Economy and Planning of the French National Assembly about the bill on modernization and development of electricity public service. The report contains four parts. The first part is titled 'Reinforcing the independence of the management of transport public network'. The questions of independence of EDF and the autonomy of the grid management are addressed. Also, the issue of the transparency of the transport public network management is presented. The second part discusses the means of ensuring an efficient regulation of electricity market. The missions of the Electricity Regulation Commission (CRE) are presented in connection with tariff establishment, multi-annual investment planning and consulting role of CRE. CRE's role in arbitrating the conflicts and the endorsement of the judge of public service as well as the harmonizing the competences of CRE and Competition Council are also showed. The efficiency of regulation as resulting from a consolidated independence of CRE is demonstrated. The third part concerns reinforcing the electricity public service. The principles of electricity public service are exposed as well as requirements for increasing transparency in financing the public service obligations. The forth part concerns the ways of encouraging the participation of local communities in the organization of electric sector. The issues relating to mixed organization of electricity distribution, its modernization and the role of local communities with respect to supply distribution and environment protection are exposed.

  3. Puget Sound area electric reliability plan: Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin

  4. Heuristic method for restoration of the service in electric power distribution systems

    International Nuclear Information System (INIS)

    Lemoine, Cesar Arango; Lopez Lezama, Jesus Maria; Gonzalez Londono, Monica Alejandra

    2006-01-01

    When there is an outage in a radial electrical distribution system, the isolation of the faulted section will result in the isolation of some portions of the feeder downstream from the affected area. Therefore, the next step will be to restore the service to the affected users. This restoration must be done as quickly as possible considering topology and feeder capacity restrictions. This paper describes an algorithm for service restoration via feeder reconfiguration. Results are shown under a distribution system with 11 buses and 3 main feeders

  5. Beliefs concerning the reliability of nuclear power plant in-service inspections; Uskomuksia ydinvoimalaitoksissa suoritettavien tarkastusten luotettavuudesta

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J. [VTT Automation, Espoo (Finland)

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials` beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees` own justification. (refs.).

  6. A Scalable and Reliable Message Transport Service for the ATLAS Trigger and Data Acquisition System

    CERN Document Server

    Kazarov, A; The ATLAS collaboration; Kolos, S; Lehmann Miotto, G; Soloviev, I

    2014-01-01

    The ATLAS Trigger and Data Acquisition (TDAQ) is a large distributed computing system composed of several thousands of interconnected computers and tens of thousands applications. During a run, TDAQ applications produce a lot of control and information messages with variable rates, addressed to TDAQ operators or to other applications. Reliable, fast and accurate delivery of the messages is important for the functioning of the whole TDAQ system. The Message Transport Service (MTS) provides facilities for the reliable transport, the filtering and the routing of the messages, basing on publish-subscribe-notify communication pattern with content-based message filtering. During the ongoing LHC shutdown, the MTS was re-implemented, taking into account important requirements like reliability, scalability and performance, handling of slow subscribers case and also simplicity of the design and the implementation. MTS uses CORBA middleware, a common layer for TDAQ infrastructure, and provides sending/subscribing APIs i...

  7. Accelerated reliability testing of highly aligned single-walled carbon nanotube networks subjected to DC electrical stressing.

    Science.gov (United States)

    Strus, Mark C; Chiaramonti, Ann N; Kim, Young Lae; Jung, Yung Joon; Keller, Robert R

    2011-07-01

    We investigate the electrical reliability of nanoscale lines of highly aligned, networked, metallic/semiconducting single-walled carbon nanotubes (SWCNTs) fabricated through a template-based fluidic assembly process. We find that these SWCNT networks can withstand DC current densities larger than 10 MA cm(-2) for several hours and, in some cases, several days. We develop test methods that show that the degradation rate, failure predictability and total device lifetime can be linked to the initial resistance. Scanning electron and transmission electron microscopy suggest that fabrication variability plays a critical role in the rate of degradation, and we offer an empirical method of quickly determining the long-term performance of a network. We find that well-fabricated lines subject to constant electrical stress show a linear accumulation of damage reminiscent of electromigration in metallic interconnects, and we explore the underlying physical mechanisms that could cause such behavior.

  8. A pilot study to explore the feasibility of using theClinical Care Classification System for developing a reliable costing method for nursing services.

    Science.gov (United States)

    Dykes, Patricia C; Wantland, Dean; Whittenburg, Luann; Lipsitz, Stuart; Saba, Virginia K

    2013-01-01

    While nursing activities represent a significant proportion of inpatient care, there are no reliable methods for determining nursing costs based on the actual services provided by the nursing staff. Capture of data to support accurate measurement and reporting on the cost of nursing services is fundamental to effective resource utilization. Adopting standard terminologies that support tracking both the quality and the cost of care could reduce the data entry burden on direct care providers. This pilot study evaluated the feasibility of using a standardized nursing terminology, the Clinical Care Classification System (CCC), for developing a reliable costing method for nursing services. Two different approaches are explored; the Relative Value Unit RVU and the simple cost-to-time methods. We found that the simple cost-to-time method was more accurate and more transparent in its derivation than the RVU method and may support a more consistent and reliable approach for costing nursing services.

  9. On-site A.C. electric power sources for 900 MWe french nuclear power reactors: reliability and importances for safety

    International Nuclear Information System (INIS)

    Milhem, J.L.; Gros, G.

    1985-10-01

    After presenting briefly the new provisions laid down by the Electricite de France to meet a total electrical power loss, the main elements of the probabilistic study concerning the corresponding risk are described: reliability data of internal sources used, results of risk improvement brought by the new measures, importance for internal source before and after implementation of the new measures

  10. On-site A.C. electric power sources for 900 MWe French nuclear power reactors: reliability and importance for safety

    Energy Technology Data Exchange (ETDEWEB)

    Milhem, J. L.; Gros, G. [Commissariat a l' Energie Atomique, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    After presenting briefly the new provisions laid down by the Electricite de France to meet a total electrical power loss, the main elements of the probabilistic study concerning the corresponding risk described: reliability data of internal sources used, results of risk Improvement brought by the new measures, importance for Internal source before and after Implementation of the new measures. (authors)

  11. Economic evaluation of reliability-centred maintenance (RCM): an electricity transmission industry perspective

    International Nuclear Information System (INIS)

    Bowler, D.J.; Primrose, P.L.; Leonard, R.

    1995-01-01

    Traditional approaches to appraising the introduction of reliability centred maintenance (RCM) are shown to exhibit severe limitations. In particular, the economic implications surrounding its adoption are repeatedly mis-stated, with the consequence that organisations may be investing in unprofitable RCM ventures. Previously quoted benefits are examined and, contrary to established opinion, it is shown that these 'generalised' statements, once redeemed, are able to be quantified. The paper then proceeds to describe a financial methodology, developed by NGC and UMIST, by which the introduction of RCM can be evaluated. Moreover, it shows that, by regarding RCM as an investment decision, rather than an 'act of faith', the economic viability of a potential application can be determined before vital resources are committed. Finally, it is demonstrated that when the methodology is applied within the context of the electricity transmission industry, the economic case underlying the adoption of RCM can be realistically appraised. (author)

  12. How Western Does Business: An Explanation of Western's Products and Services

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-10-01

    The mission of the Western Area Power Administration is to market and deliver reliable, renewable, cost-based hydroelectric power and related services. This guide provides an overview of Western’s history and how Western carries out that mission and provides electrical, transmission and ancillary services. It also discusses how we develop plans for marketing our most valuable resources—long-term firm capacity and energy.

  13. Electric vehicle charging infrastructure assignment and power grid impacts assessment in Beijing

    International Nuclear Information System (INIS)

    Liu, Jian

    2012-01-01

    This paper estimates the charging demand of an early electric vehicle (EV) market in Beijing and proposes an assignment model to distribute charging infrastructure. It finds that each type of charging infrastructure has its limitation, and integration is needed to offer a reliable charging service. It also reveals that the service radius of fast charging stations directly influences the final distribution pattern and an infrastructure deployment strategy with short service radius for fast charging stations has relatively fewer disturbances on the power grid. Additionally, although the adoption of electric vehicles will cause an additional electrical load on the Beijing's power grid, this additional load can be accommodated by the current grid's capacity via the charging time management and the battery swap strategy. - Highlight: ► Charging posts, fast charging stations, and battery swap stations should be integrated. ► Charging posts at home parking places will take a major role in a charging network. ► A service radius of 2 km is proposed for fast charging stations deployment. ► The additional charging load from EVs can be accommodated by charging time management.

  14. Demand Response as a System Reliability Resource

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Lewis, Nancy Jo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Watson, David [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Auslander, David [Univ. of California, Berkeley, CA (United States); Paprotny, Igor [Univ. of California, Berkeley, CA (United States); Makarov, Yuri [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-12-31

    The Demand Response as a System Reliability Resource project consists of six technical tasks: • Task 2.1. Test Plan and Conduct Tests: Contingency Reserves Demand Response (DR) Demonstration—a pioneering demonstration of how existing utility load-management assets can provide an important electricity system reliability resource known as contingency reserve. • Task 2.2. Participation in Electric Power Research Institute (EPRI) IntelliGrid—technical assistance to the EPRI IntelliGrid team in developing use cases and other high-level requirements for the architecture. • Task 2.3. Research, Development, and Demonstration (RD&D) Planning for Demand Response Technology Development—technical support to the Public Interest Energy Research (PIER) Program on five topics: Sub-task 1. PIER Smart Grid RD&D Planning Document; Sub-task 2. System Dynamics of Programmable Controllable Thermostats; Sub-task 3. California Independent System Operator (California ISO) DR Use Cases; Sub-task 4. California ISO Telemetry Requirements; and Sub-task 5. Design of a Building Load Data Storage Platform. • Task 2.4. Time Value of Demand Response—research that will enable California ISO to take better account of the speed of the resources that it deploys to ensure compliance with reliability rules for frequency control. • Task 2.5. System Integration and Market Research: Southern California Edison (SCE)—research and technical support for efforts led by SCE to conduct demand response pilot demonstrations to provide a contingency reserve service (known as non-spinning reserve) through a targeted sub-population of aggregated residential and small commercial customers enrolled in SCE’s traditional air conditioning (AC) load cycling program, the Summer Discount Plan. • Task 2.6. Demonstrate Demand Response Technologies: Pacific Gas and Electric (PG&E)—research and technical support for efforts led by PG&E to conduct a demand response pilot demonstration to provide non

  15. Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Savage, N.; Graban, W.

    1979-12-01

    Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

  16. The use of reliability analysis techniques applied to nuclear power station emergency core cooling systems

    International Nuclear Information System (INIS)

    Danielsen, A.; Snaith, E.R.

    1975-01-01

    A reliability investigation carried out by the Safety and Reliability Services of the UKAEA, and the SSEB, of the essential system/reactor coolant system for a large nuclear power station is described. In AGR type reactors, after all reactor shutdown conditions, it is necessary to restore forced gas circulation and sufficient boiler feed to maintain the heat removal capacity of the boilers. The coolant requirements are provided by several independent mechanical systems of primary coolant fans, feedwater pumps, and valves integrated with electrical power sources, switchgear, and automatic control equipment. Reliability is treated as one aspect of system performance and quantified in terms of failure to meet a specific objective. Based on the reliability performance of the constituent components the optimum system configuration is determined together with the preferred plant operating procedures and maintenance requirements. (author)

  17. 18 CFR 40.3 - Availability of Reliability Standards.

    Science.gov (United States)

    2010-04-01

    ... Reliability Standards. 40.3 Section 40.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM § 40.3 Availability of Reliability Standards. The Electric Reliability...

  18. 78 FR 58492 - Generator Verification Reliability Standards

    Science.gov (United States)

    2013-09-24

    ... power capability that is available for planning models and bulk electric system reliability assessments... of generator equipment needed to support Bulk-Power System reliability and enhance coordination of... support Bulk-Power System reliability and will ensure that accurate data is verified and made available...

  19. Structural Reliability Methods for Wind Power Converter System Component Reliability Assessment

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Sørensen, John Dalsgaard

    2012-01-01

    Wind power converter systems are essential subsystems in both off-shore and on-shore wind turbines. It is the main interface between generator and grid connection. This system is affected by numerous stresses where the main contributors might be defined as vibration and temperature loadings....... The temperature variations induce time-varying stresses and thereby fatigue loads. A probabilistic model is used to model fatigue failure for an electrical component in the power converter system. This model is based on a linear damage accumulation and physics of failure approaches, where a failure criterion...... is defined by the threshold model. The attention is focused on crack propagation in solder joints of electrical components due to the temperature loadings. Structural Reliability approaches are used to incorporate model, physical and statistical uncertainties. Reliability estimation by means of structural...

  20. Problematics of Reliability of Road Rollers

    Science.gov (United States)

    Stawowiak, Michał; Kuczaj, Mariusz

    2018-06-01

    This article refers to the reliability of road rollers used in a selected roadworks company. Information on the method of road rollers service and how the service affects the reliability of these rollers is presented. Attention was paid to the process of the implemented maintenance plan with regard to the machine's operational time. The reliability of road rollers was analyzed by determining and interpreting readiness coefficients.

  1. Evaluation of Electric Vehicle Charging Controllability for Provision of Time Critical Grid Services

    DEFF Research Database (Denmark)

    Martinenas, Sergejus; Marinelli, Mattia; Andersen, Peter Bach

    2016-01-01

    Replacement of conventional generation by more stochastic renewable generation sources leads to reduction of inertia and controllability in the power system. This introduces the need for more dynamic regulation services. These faster services could potentially be provided by the growing number...... of electric vehicles. EVs are a fast responding energy resource with high availability. This work evaluates and experimentally shows the limits of EV charging controllability with the focus on its suitability for providing ancillary grid services. Three different series produced EVs are tested....... The experimental testing is done by using charging current controllability of built-in AC charger to provide a primary frequency regulation service with very dynamic input frequency. The results show that most the controllability of most EVs is more than suitable for providing time critical grid services...

  2. Incorporating reliability evaluation into the uncertainty analysis of electricity market price

    International Nuclear Information System (INIS)

    Kang, Chongqing; Bai, Lichao; Xia, Qing; Jiang, Jianjian; Zhao, Jing

    2005-01-01

    A novel model and algorithm for analyzing the uncertainties in electricity market is proposed in this paper. In this model, bidding decision is formulated as a probabilistic model that takes into account the decision-maker's willingness to bid, risk preferences, the fluctuation of fuel-price, etc. At the same time, generating unit's uncertain output model is considered by its forced outage rate (FOR). Based on the model, the uncertainty of market price is then analyzed. Taking the analytical results into consideration, not only the reliability of the power system can be conventionally analyzed, but also the possible distribution of market prices can be easily obtained. The probability distribution of market prices can be further used to calculate the expected output and the sales income of generating unit in the market. Based on these results, it is also possible to evaluate the risk involved by generating units. A simple system with four generating units is used to illustrate the proposed algorithm. The proposed algorithm and the modeling technique are expected to helpful to the market participants in making their economic decisions

  3. Can Slovakia secure reliable electricity supply without nuclear?

    International Nuclear Information System (INIS)

    Pnacek, I.

    2004-01-01

    In this presentation author deals with structure of electricity production in the Slovak republic in 2006 and perspectives of electricity supply up to 2020 year. Decommissioning of Unit 1 and Unit 2 of the Bohunice NPP and completion of Unit 3 and 4 of the Mochovce NPP are discussed

  4. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  5. A Three-Part Electricity Price Mechanism for Photovoltaic-Battery Energy Storage Power Plants Considering the Power Quality and Ancillary Service

    Directory of Open Access Journals (Sweden)

    Yajing Gao

    2017-08-01

    Full Text Available To solve the problem of solar abandoning, which is accompanied by the rapid development of photovoltaic (PV power generation, a demonstration of a photovoltaic-battery energy storage system (PV-BESS power plant has been constructed in Qinghai province in China. However, it is difficult for the PV-BESS power plant to survive and develop with the current electricity price mechanism and subsidy policy. In this paper, a three-part electricity price mechanism is proposed based on a deep analysis of the construction and operation costs and economic income. The on-grid electricity price is divided into three parts: the capacity price, graded electricity price, and ancillary service price. First, to ensure that the investment of the PV-BESS power plant would achieve the industry benchmark income, the capacity price and benchmark electricity price are calculated using the discounted cash flow method. Then, the graded electricity price is calculated according to the grade of the quality of grid-connected power. Finally, the ancillary service price is calculated based on the graded electricity price and ancillary service compensation. The case studies verify the validity of the three-part electricity price mechanism. The verification shows that the three-part electricity price mechanism can help PV-BESS power plants to obtain good economic returns, which can promote the development of PV-BESS power plants.

  6. Electrical service and controls for Joule heating of a defense waste experimental glass melter

    International Nuclear Information System (INIS)

    Erickson, C.J.; Haideri, A.Q.

    1983-01-01

    Vitrification of radioactive liquid waste in a glass matrix is a leading candidate for long-term storage of high-level waste. This paper describes the electrical service and control system for an experimental electrically heated, nonradioactive glass melter installed at Savannah River Laboratory. Data accumulated, and design/operating experience acquired in operating this melter, are being used to design a modified melter to be installed in a processing area for use with radioactive materials

  7. Development on power distribution technologies of four electric power companies in Japan. The Kansai Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Since dependency upon electric power has been rising yearly with the development of industry and the progress of information-oriented society, various kinds of technical development are needed to supply electricity. Furthermore, amenity of people's living has been highly intended, and life style has varied. Consequently, customers' needs for energy including related services have varied remarkably, and each customer has selected energy more subjectively from the wide range of viewpoint such as reliability, handiness, cleanliness, safety, and economic efficiency. In such situation, the power distribution section of Kansai Electric Power settled four themes for major technical development and has been promoting them. Four themes are as follows; to develop a total automation system for power distribution, to promote 20kV/400V-class power distribution, to develop techniques to form facilities harmonizing with local amenity, and to make business management efficient with the advanced NC system. 3 figs., 4 tabs.

  8. Reliability and Availability of Cloud Computing

    CERN Document Server

    Bauer, Eric

    2012-01-01

    A holistic approach to service reliability and availability of cloud computing Reliability and Availability of Cloud Computing provides IS/IT system and solution architects, developers, and engineers with the knowledge needed to assess the impact of virtualization and cloud computing on service reliability and availability. It reveals how to select the most appropriate design for reliability diligence to assure that user expectations are met. Organized in three parts (basics, risk analysis, and recommendations), this resource is accessible to readers of diverse backgrounds and experience le

  9. EVC EXPO 80. Proceedings of the third international electric vehicle conference, St. Louis, MO, May 20-22, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, L.

    1980-01-01

    Issues and trends in the case of electric vehicles are considered along with vehicle systems, EV fleet user experience, batteries, aspects of vehicle testing, EV commercial market and vehicle potentials, EV cost considerations, the effective utilization of EVs, and modeling, mission analysis, and impact assessment. Attention is given to EV component reliability, automatic gearshift control for an efficient battery vehicle drive system, a brushless DC motor-power conditioner unit designed and built for propulsion of electric passenger vehicles, a roadway powered electric vehicle system, inductively coupled power systems for electric vehicles, a fuel-cell-powered golf cart, electric vehicles in telephone service, electric vehicle use in the U.S. Postal Service, high performance electric commercial vehicles, nickel iron battery design and performance, the development of the nickel-iron-battery system for electric vehicle propulsion, the advancing performance threshold of the lead-acid electric vehicle battery, advances in zinc bromine batteries for motive power, some aspects of battery vehicle evaluation with particular attention to a battery model, and a generic battery model for electric and hybrid vehicle simulation performance prediction.

  10. Serviceability design load factors and reliability assessments for reinforced concrete containment structures

    International Nuclear Information System (INIS)

    Han Bong Koo

    1998-01-01

    A reinforced concrete nuclear power plant containment structure is subjected to various random static and stochastic loads during its lifetime. Since these loads involve inherent randomness and other uncertainties, an appropriate probabilistic model for each load must be established in order to perform reliability analysis. The current ASME code for reinforced concrete containment structures are not based on probability concepts. The stochastic nature of natural hazard or accidental loads and the variations of material properties require a probabilistic approach for a rational assessment of structural safety and performance. The paper develops probability-based load factors for the limit state design of reinforced concrete containment structures. The purpose of constructing reinforced concrete containment structure is to protect against radioactive release, and so the use of a serviceability limit state against crack failure that can cause the emission of radioactive materials is suggested as a critical limit state for reinforced concrete containment structures. Load factors for the design of reinforced concrete containment structures are proposed and carried out the reliability assessments. (orig.)

  11. A new spinning reserve requirement forecast method for deregulated electricity markets

    International Nuclear Information System (INIS)

    Amjady, Nima; Keynia, Farshid

    2010-01-01

    Ancillary services are necessary for maintaining the security and reliability of power systems and constitute an important part of trade in competitive electricity markets. Spinning Reserve (SR) is one of the most important ancillary services for saving power system stability and integrity in response to contingencies and disturbances that continuously occur in the power systems. Hence, an accurate day-ahead forecast of SR requirement helps the Independent System Operator (ISO) to conduct a reliable and economic operation of the power system. However, SR signal has complex, non-stationary and volatile behavior along the time domain and depends greatly on system load. In this paper, a new hybrid forecast engine is proposed for SR requirement prediction. The proposed forecast engine has an iterative training mechanism composed of Levenberg-Marquadt (LM) learning algorithm and Real Coded Genetic Algorithm (RCGA), implemented on the Multi-Layer Perceptron (MLP) neural network. The proposed forecast methodology is examined by means of real data of Pennsylvania-New Jersey-Maryland (PJM) electricity market and the California ISO (CAISO) controlled grid. The obtained forecast results are presented and compared with those of the other SR forecast methods. (author)

  12. A new spinning reserve requirement forecast method for deregulated electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Amjady, Nima; Keynia, Farshid [Department of Electrical Engineering, Semnan University, Semnan (Iran)

    2010-06-15

    Ancillary services are necessary for maintaining the security and reliability of power systems and constitute an important part of trade in competitive electricity markets. Spinning Reserve (SR) is one of the most important ancillary services for saving power system stability and integrity in response to contingencies and disturbances that continuously occur in the power systems. Hence, an accurate day-ahead forecast of SR requirement helps the Independent System Operator (ISO) to conduct a reliable and economic operation of the power system. However, SR signal has complex, non-stationary and volatile behavior along the time domain and depends greatly on system load. In this paper, a new hybrid forecast engine is proposed for SR requirement prediction. The proposed forecast engine has an iterative training mechanism composed of Levenberg-Marquadt (LM) learning algorithm and Real Coded Genetic Algorithm (RCGA), implemented on the Multi-Layer Perceptron (MLP) neural network. The proposed forecast methodology is examined by means of real data of Pennsylvania-New Jersey-Maryland (PJM) electricity market and the California ISO (CAISO) controlled grid. The obtained forecast results are presented and compared with those of the other SR forecast methods. (author)

  13. Bayesian approach in the power electric systems study of reliability ...

    African Journals Online (AJOL)

    Keywords: Reliability - Power System - Bayes Theorem - Weibull Model - Probability. ... ensure a series of estimated parameter (failure rate, mean time to failure, function .... only on random variable r.v. describing the operating conditions: ..... Multivariate performance reliability prediction in real-time, Reliability Engineering.

  14. Policies and means to assess and improve service quality in electricity supply systems

    International Nuclear Information System (INIS)

    Lagostena, L.; Mirra, C.; Noferi, P.L.; Sani, G.

    1992-03-01

    Quality of electricity supply to users consists of a series of characteristics of the voltage at the points of delivery. This report shows how service quality, in the past basically related to the tolerance of voltage and frequency with respect to the nominal value, as well as, to the continuity of supply, is nowadays assessed also in relation to other aspects, generally referred to as disturbances. Short interruptions, voltage dips, transient overvoltages, harmonics and flicker are mainly taken into consideration. A description is given of the approach adopted by ENEL (the Italian Electricity Board) in order to evaluate and, if required, improve the quality of service, based upon the acquisition of data related to faults, interruptions and disturbances. These data are processed in order to obtain significant indices on the state of the network and on the effectiveness of the actions which can be implemented. Finally, the measures which may lead to an improvement in the quality of service are identified, and potential advantages, in terms of the reduction of non-supplied energy and number of faults, of adopting appropriate automatic devices and optimizing maintenance work on some distribution networks are illustrated

  15. Variables contributing to an excellent customer service management profile within the regulated electric utility industry: A comparison of self-concept with customer satisfaction for customer service management

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, L.E.

    1991-01-01

    This research sought to address the relationship between self-concept and customer satisfaction: can customer satisfaction with a major electric utility be explained in terms of the self-reported, self-concept of the utility's managers The population to which the results of this study were generalized consisted of customer service managers in public electric utilities across the United States. In order to represent this population, a sample was selected consisting of customer service managers at a midwestern electric utility based in a large metropolitan area. Participants in this study were managers of four direct customer contact service organizations within six geographic division organizations. The methodology included comparisons of these four customer contact service organizations on twelve independent, self-concept variables and six customer satisfaction dependent variables using Analysis of Variance (ANOVA), Scheffe' tests, Chi-Square, and Stepwise multiple regression. The groups were found not to be significantly different and knowledge of the self-concept scores for managers will not increase the ability to predict customer satisfaction over no knowledge of self-concept scores.

  16. Implementing batteries in electrical grids. Possible operating modes for efficient business cases

    Energy Technology Data Exchange (ETDEWEB)

    Kittlaus, Barnabas; Schreider, Achim; Pour, Adel Hassan [Lahmeyer International GmbH, Bad Vilbel (Germany)

    2010-07-01

    For almost two decades, there has been a global trend towards the deregulation and the liberalisation of electricity markets. Previously, national or regional monopolistic utility companies provided services along the entire supply chain of electricity supply: Beginning with the operation of power plants and thus the generation of electricity, continuing through the development and the operation of transmission and local distribution grids, to the connection points. Since all assets belonged to the utility company, they could easily access generation units in order to provide balancing power for the safe and reliable operation of the electricity networks. With the objective of a more efficient and cheaper electricity supply by enabling competition, European Directive 96/92/EC (repealed by 2003/53/EC) enacted so-called ''unbundling'' which meant the break-up of utility companies as full service suppliers into the three service oriented entities; for electricity generation, transmission and supply. Whereas previously a single utility company provided the balancing of the electricity grid with its own assets, as a consequence of the directive, markets developed for the provision of diverse technical services. As long as the utility companies provided these services on their own, technical rather than economic aspects prevailed in their investment decisions. With the establishment of open markets for primary, secondary and tertiary reserve power, commercial interfaces had been established which force the respective specialised market actor to investment decisions driven primarily by economic aspects. At nearly the same time - around two decades ago, the first renewable energy systems (RES) provided electricity to public grids. In the 1990's their share of the overall electricity mix was negligible, but since the beginning of the new millennium more and more countries recognised the ecological and economic advantages of RES and established incentive systems for their

  17. Multi-Disciplinary System Reliability Analysis

    Science.gov (United States)

    Mahadevan, Sankaran; Han, Song

    1997-01-01

    The objective of this study is to develop a new methodology for estimating the reliability of engineering systems that encompass multiple disciplines. The methodology is formulated in the context of the NESSUS probabilistic structural analysis code developed under the leadership of NASA Lewis Research Center. The NESSUS code has been successfully applied to the reliability estimation of a variety of structural engineering systems. This study examines whether the features of NESSUS could be used to investigate the reliability of systems in other disciplines such as heat transfer, fluid mechanics, electrical circuits etc., without considerable programming effort specific to each discipline. In this study, the mechanical equivalence between system behavior models in different disciplines are investigated to achieve this objective. A new methodology is presented for the analysis of heat transfer, fluid flow, and electrical circuit problems using the structural analysis routines within NESSUS, by utilizing the equivalence between the computational quantities in different disciplines. This technique is integrated with the fast probability integration and system reliability techniques within the NESSUS code, to successfully compute the system reliability of multi-disciplinary systems. Traditional as well as progressive failure analysis methods for system reliability estimation are demonstrated, through a numerical example of a heat exchanger system involving failure modes in structural, heat transfer and fluid flow disciplines.

  18. Power electronics reliability analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Mark A.; Atcitty, Stanley

    2009-12-01

    This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

  19. Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, C.A.

    1995-01-01

    This Quality Assurance Program Plan (QAPP) is organized to address WHC's implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE

  20. Did the expiration of retail price caps affect prices in the restructured Texas electricity market?

    International Nuclear Information System (INIS)

    Kang, Linhong; Zarnikau, Jay

    2009-01-01

    On January 1, 2007, the Electric Reliability Council of Texas (ERCOT) market became the first restructured market in the US to completely remove caps on the prices which could be charged to residential energy consumers by the retailers associated with the traditional or incumbent utility service providers. Our analysis suggests that the expiration of the price-to-beat (PTB) price caps may have led to a reduction in the average prices charged by competitive retail electric providers (REPs). (author)

  1. Availability/reliability of gas supplies are concerns for utilities

    International Nuclear Information System (INIS)

    Smith, D.J.

    1992-01-01

    This paper reports that long-term economical and reliable fuel contracts are imperative for increased use of natural gas. Demand for natural gas grew by 3.3% in 1991 to 19.3 trillion cubic feet (tcf) according to the U.S. Department of Energy's Energy Information Administration (EIA). during 1992, EIA expects natural gas demand to grow about 1.8%. However, EIA predicts that natural gas demand will be down slightly in the electric power sector. This is despite the potential for continuing lower gas prices and availability. wellhead prices for natural gas fell by more than 9% in 1991. Although EIA forecasts a decline in natural gas use by electric utilities, a study undertaken by ICF Resources for Enron Power Services, Inc. expects natural gas consumption in the power industry to increase in the 1990s. ICF says that the growth will occur because many new plants will be gas-fired, many existing electric utility power plants designed for oil and/or natural gas operation will use natural gas, and about half of new non-utility power plants will be gas-fired

  2. Optimized batteries for cars with dual electrical architecture

    Science.gov (United States)

    Douady, J. P.; Pascon, C.; Dugast, A.; Fossati, G.

    During recent years, the increase in car electrical equipment has led to many problems with traditional starter batteries (such as cranking failure due to flat batteries, battery cycling etc.). The main causes of these problems are the double function of the automotive battery (starter and service functions) and the difficulties in designing batteries well adapted to these two functions. In order to solve these problems a new concept — the dual-concept — has been developed with two separate batteries: one battery is dedicated to the starter function and the other is dedicated to the service function. Only one alternator charges the two batteries with a separation device between the two electrical circuits. The starter battery is located in the engine compartment while the service battery is located at the rear of the car. From the analysis of new requirements, battery designs have been optimized regarding the two types of functions: (i) a small battery with high specific power for the starting function; for this function a flooded battery with lead-calcium alloy grids and thin plates is proposed; (ii) for the service function, modified sealed gas-recombinant batteries with cycling and deep-discharge ability have been developed. The various advantages of the dual-concept are studied in terms of starting reliability, battery weight, and voltage supply. The operating conditions of the system and several dual electrical architectures have also been studied in the laboratory and the car. The feasibility of the concept is proved.

  3. 18 CFR 40.2 - Mandatory Reliability Standards.

    Science.gov (United States)

    2010-04-01

    ...-POWER SYSTEM § 40.2 Mandatory Reliability Standards. (a) Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Mandatory Reliability...

  4. 75 FR 26206 - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric...

    Science.gov (United States)

    2010-05-11

    ... renewable energy and increased durability and ease of repair in response to attacks or natural disasters. \\3... power restoration in an emergency or natural disaster, reliable service, and for protection from a cyber attack on the electric grid.\\12\\ DOE thus seeks to better understand this need for dedicated spectrum...

  5. Electric-stress reliability and current collapse of different thickness SiNx passivated AlGaN/GaN high electron mobility transistors

    International Nuclear Information System (INIS)

    Ling, Yang; Gui-Zhou, Hu; Yue, Hao; Xiao-Hua, Ma; Si, Quan; Li-Yuan, Yang; Shou-Gao, Jiang

    2010-01-01

    This paper investigates the impact of electrical degradation and current collapse on different thickness SiN x passivated AlGaN/GaN high electron mobility transistors. It finds that higher thickness SiN x passivation can significantly improve the high-electric-field reliability of a device. The degradation mechanism of the SiN x passivation layer under ON-state stress has also been discussed in detail. Under the ON-state stress, the strong electric-field led to degradation of SiN x passivation located in the gate-drain region. As the thickness of SiN x passivation increases, the density of the surface state will be increased to some extent. Meanwhile, it is found that the high NH 3 flow in the plasma enhanced chemical vapour deposition process could reduce the surface state and suppress the current collapse. (condensed matter: electronic structure, electrical, magnetic, and optical properties)

  6. Small nuclear power reactor emergency electric power supply system reliability comparative analysis; Analise da confiabilidade do sistema de suprimento de energia eletrica de emergencia de um reator nuclear de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Bonfietti, Gerson

    2003-07-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  7. Value-based distributed generator placements for service quality improvements

    Energy Technology Data Exchange (ETDEWEB)

    Teng, Jen-Hao; Chen, Chi-Fa [Department of Electrical Engineering, I-Shou University, No. 1, Section 1, Syuecheng Road, Dashu Township, Kaohsiung Country 840 (Taiwan); Liu, Yi-Hwa [Department of Electrical Engineering, National Taiwan University of Science and Technology, Taipei (Taiwan); Chen, Chia-Yen [Department of Computer Science, The University of Auckland (New Zealand)

    2007-03-15

    Distributed generator (DG) resources are small, self-contained electric generating plants that can provide power to homes, businesses or industrial facilities in distribution feeders. They can be used to reduce power loss and improve service reliability. However, the values of DGs are largely dependent on their types, sizes and locations as they were installed in distribution feeders. A value-based method is proposed in this paper to enhance the reliability and obtain the benefits for DG placement. The benefits of DG placement described in this paper include power cost saving, power loss reduction, and reliability enhancement. The costs of DG placement include the investment, maintenance and operating costs. The proposed value-based method tries to find the best tradeoff between the costs and benefits of DG placement and then find the optimal types of DG and their corresponding locations and sizes in distribution feeders. The derived formulations are solved by a genetic algorithm based method. Test results show that with proper types, sizes and installation site selection, DG placement can be used to improve system reliability, reduce customer interruption costs and save power cost; as well as enabling electric utilities to obtain the maximal economical benefits. (author)

  8. 77 FR 26714 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2012-05-07

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... Standards for the Bulk Power System, 130 FERC ] 61,200 (2010) (March 2010 Order). \\12\\ Mandatory Reliability... excluded from future planning assessments and its potential impact to bulk electric system reliability...

  9. Reliability 'H' scheme of HV/MV substations

    Directory of Open Access Journals (Sweden)

    Perić Dragoslav M.

    2015-01-01

    Full Text Available Substations (HV/MV connect transmission and distribution systems with consumers of electric energy. The selective search method was used for calculation of substation reliability, where all arrangement elements were grouped into blocks. Subject of the analysis was H-arrangements comprising air-insulated switchgears on the high voltage side of HV/MV substations with different number of feeder and transformer bays and diverse scope of the installed switching equipment. Failure rate and duration were used as main HV/MV substation equipment reliability indices. A large number of arrangements were classified into groups, and within a group the arrangements were ranked with the use of multiple criteria. It is shown that the reliability of the electricity transit depends on the equipment of field for the transit of electricity, which favors poorly equipped field. On the other hand, the reliability of transformation of the full power depends mostly on the equipment in coupling field. It is essential that in the coupling field, there are at least two disconnectors. Installation of the switch in the coupling field is meaningful only with appropriate protection, because it further improves reliability. Conclusions are drawn for phased construction and expansion of the single pole diagram with an additional field for the transmission line.

  10. A reliable method for intracranial electrode implantation and chronic electrical stimulation in the mouse brain.

    Science.gov (United States)

    Jeffrey, Melanie; Lang, Min; Gane, Jonathan; Wu, Chiping; Burnham, W McIntyre; Zhang, Liang

    2013-08-06

    Electrical stimulation of brain structures has been widely used in rodent models for kindling or modeling deep brain stimulation used clinically. This requires surgical implantation of intracranial electrodes and subsequent chronic stimulation in individual animals for several weeks. Anchoring screws and dental acrylic have long been used to secure implanted intracranial electrodes in rats. However, such an approach is limited when carried out in mouse models as the thin mouse skull may not be strong enough to accommodate the anchoring screws. We describe here a screw-free, glue-based method for implanting bipolar stimulating electrodes in the mouse brain and validate this method in a mouse model of hippocampal electrical kindling. Male C57 black mice (initial ages of 6-8 months) were used in the present experiments. Bipolar electrodes were implanted bilaterally in the hippocampal CA3 area for electrical stimulation and electroencephalographic recordings. The electrodes were secured onto the skull via glue and dental acrylic but without anchoring screws. A daily stimulation protocol was used to induce electrographic discharges and motor seizures. The locations of implanted electrodes were verified by hippocampal electrographic activities and later histological assessments. Using the glue-based implantation method, we implanted bilateral bipolar electrodes in 25 mice. Electrographic discharges and motor seizures were successfully induced via hippocampal electrical kindling. Importantly, no animal encountered infection in the implanted area or a loss of implanted electrodes after 4-6 months of repetitive stimulation/recording. We suggest that the glue-based, screw-free method is reliable for chronic brain stimulation and high-quality electroencephalographic recordings in mice. The technical aspects described this study may help future studies in mouse models.

  11. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO₂ Gate Dielectrics by CF₄ Plasma Treatment.

    Science.gov (United States)

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-05-17

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO₂ gate insulator and CF₄ plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO₂ gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm²/V∙s (without treatment) to 54.6 cm²/V∙s (with CF₄ plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO₂ gate dielectric has also been improved by the CF₄ plasma treatment. By applying the CF₄ plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device's immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF₄ plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO₂ gate dielectric, but also enhances the device's reliability.

  12. Reliability and validity of the workplace harassment questionnaire for Korean finance and service workers.

    Science.gov (United States)

    Lee, Myeongjun; Kim, Hyunjung; Shin, Donghee; Lee, Sangyun

    2016-01-01

    Harassment means systemic and repeated unethical acts. Research on workplace harassment have been conducted widely and the NAQ-R has been widely used for the researches. But this tool, however the limitations in revealing differended in sub-factors depending on the culture and in reflecting that unique characteristics of the Koren society. So, The workplace harassment questionnaire for Korean finace and service workers has been developed to assess the level of personal harassment at work. This study aims to develop a tool to assess the level of personal harassment at work and to test its validity and reliability while examining specific characteristics of workplace harassment against finance and service workers in Korea. The framework of survey was established based on literature review, focused-group interview for the Korean finance and service workers. To verify its reliability, Cronbach's alpha coefficient was calculated; and to verify its validity, items and factors of the tool were analyzed. The correlation matrix analysis was examined to verify the tool's convergent validity and discriminant validity. Structural validity was verified by checking statistical significance in relation to the BDI-K. Cronbach's alpha coefficient of this survey was 0.93, which indicates a quite high level of reliability. To verify the appropriateness of this survey tool, its construct validity was examined through factor analysis. As a result of the factor analysis, 3 factors were extracted, explaining 56.5 % of the total variance. The loading values and communalities of the 20 items were 0.85 to 0.48 and 0.71 to 0.46. The convergent validity and discriminant validity were analyzed and rate of item discriminant validity was 100 %. Finally, for the concurrent validity, We examined the relationship between the WHI-KFSW and pschosocial stress by examining the correlation with the BDI-K. The results of chi-square test and multiple logistic analysis indicated that the correlation with

  13. 75 FR 35689 - System Personnel Training Reliability Standards

    Science.gov (United States)

    2010-06-23

    ... planning staff at control areas and reliability coordinators concerning power system characteristics and... Coordination--Staffing). \\11\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, Federal... American bulk electric system are competent to perform those reliability-related tasks.\\22\\ The proposed...

  14. Cost/benefit assessment in electric power systems

    International Nuclear Information System (INIS)

    Oteng-Adjei, J.

    1990-01-01

    The basic function of a modern power system is to satisfy the system load requirements as economically as possible and with a reasonable assurance of continuity and quality. The question of what is reasonable can be examined in terms of the costs and the worth to the consumer associated with providing an adequate supply. The process of preparing reliability worth estimates based on customer cost-of-interruption data is presented. These data can be derived for a particular utility service area and are used to determine appropriate customer damage functions. These indicators can be used with the basic loss of energy expectation (LOEE) index to obtain a factor that can be utilized to relate the customer losses to the worth of electric service reliability. This factor is designated as the interrupted energy assessment rate (IEAR). The developed IEAR values can be utilized in both generating capacity and composite generation and transmission system assessment. Methods for using these estimates in power system optimization at the planning stages are described and examples are used to illustrate the procedures. 106 refs., 77 figs., 64 tabs

  15. Fuel cell assembly unit for promoting fluid service and electrical conductivity

    Science.gov (United States)

    Jones, Daniel O.

    1999-01-01

    Fluid service and/or electrical conductivity for a fuel cell assembly is promoted. Open-faced flow channel(s) are formed in a flow field plate face, and extend in the flow field plate face between entry and exit fluid manifolds. A resilient gas diffusion layer is located between the flow field plate face and a membrane electrode assembly, fluidly serviced with the open-faced flow channel(s). The resilient gas diffusion layer is restrained against entering the open-faced flow channel(s) under a compressive force applied to the fuel cell assembly. In particular, a first side of a support member abuts the flow field plate face, and a second side of the support member abuts the resilient gas diffusion layer. The support member is formed with a plurality of openings extending between the first and second sides of the support member. In addition, a clamping pressure is maintained for an interface between the resilient gas diffusion layer and a portion of the membrane electrode assembly. Preferably, the support member is spikeless and/or substantially flat. Further, the support member is formed with an electrical path for conducting current between the resilient gas diffusion layer and position(s) on the flow field plate face.

  16. Secure provision of reactive power ancillary services in competitive electricity markets

    Science.gov (United States)

    El-Samahy, Ismael

    The research work presented in this thesis discusses various complex issues associated with reactive power management and pricing in the context of new operating paradigms in deregulated power systems, proposing appropriate policy solutions. An integrated two-level framework for reactive power management is set forth, which is both suitable for a competitive market and ensures a secure and reliable operation of the associated power system. The framework is generic in nature and can be adopted for any electricity market structure. The proposed hierarchical reactive power market structure comprises two stages: procurement of reactive power resources on a seasonal basis, and real-time reactive power dispatch. The main objective of the proposed framework is to provide appropriate reactive power support from service providers at least cost, while ensuring a secure operation of the power system. The proposed procurement procedure is based on a two-step optimization model. First, the marginal benefits of reactive power supply from each provider, with respect to system security, are obtained by solving a loadability-maximization problem subject to transmission security constraints imposed by voltage and thermal limits. Second, the selected set of generators is determined by solving an optimal power flow (OPF)-based auction. This auction maximizes a societal advantage function comprising generators' offers and their corresponding marginal benefits with respect to system security, and considering all transmission system constraints. The proposed procedure yields the selected set of generators and zonal price components, which would form the basis for seasonal contracts between the system operator and the selected reactive power service providers. The main objective of the proposed reactive power dispatch model is to minimize the total payment burden on the Independent System Operator (ISO), which is associated with reactive power dispatch. The real power generation is

  17. 76 FR 66328 - Callaway Golf Ball Operations, Inc., Including On-Site Leased Workers From Reliable Temp Services...

    Science.gov (United States)

    2011-10-26

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-80,110] Callaway Golf Ball... Golf Ball Operations, Inc., including on-site leased workers from Reliable Temp Services, Inc., and... production of golf balls. The notice was published in the Federal Register on July 8, 2011 (76 FR 40401). At...

  18. Principles of Bridge Reliability

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Nowak, Andrzej S.

    The paper gives a brief introduction to the basic principles of structural reliability theory and its application to bridge engineering. Fundamental concepts like failure probability and reliability index are introduced. Ultimate as well as serviceability limit states for bridges are formulated......, and as an example the reliability profile and a sensitivity analyses for a corroded reinforced concrete bridge is shown....

  19. Technical report on the Piping Reliability Proving Tests at the Japan Atomic Energy Research Institute

    International Nuclear Information System (INIS)

    1993-05-01

    Japan Atomic Energy Research Institute (JAERI) conducts Piping Reliability Proving Tests from 1975 to 1992 based upon the contracts between JAERI and Science and Technology Agency of Japan (STA) under the auspices of the special account law for electric power development promotion. The purpose of these tests are to prove the structural reliability of the primary cooling piping constituting a part of the pressure boundary in the light water reactor power plants. The tests with large experimental facilities had ended already in 1990. Presently piping reliability analysis by the probabilistic fracture mechanics method is being done. Until now annual reports concerning the proving tests were produced and submitted to STA, whereas this report summarizes the test results done during these 16 years. Objectives of the piping reliability proving tests are to prove that the primary piping of the light water reactor (1) be reliable throughout the service period, (2) have no possibility of rupture, (3) bring no detrimental influence on the surrounding instrumentations or equipments near the break location even if it ruptured suddenly. To attain these objectives (i) pipe fatigue tests, (ii) unstable pipe fracture tests, (iii) pipe rupture tests and also the analyses by computer codes were done. After carrying out these tests, it is verified that the piping is reliable throughout the service period. The authors of this report are T. Isozaki, K. Shibata, S. Ueda, R. Kurihara, K. Onizawa and A. Kohsaka. The parts they wrote are shown in contents. (author)

  20. Electricity mix and ecological assessments. Consequences of the choice of specific electricity mixes in analyses of the environmental performance of products and services

    International Nuclear Information System (INIS)

    Menard, M.; Dones, R.; Gantner, U.

    1998-12-01

    The study aims at analysing the methodological issues associated with the definition of electricity mixes and discussing the consequences of the choice of specific electricity mixes in analyses of the environmental performance of products and services, based on Life Cycle Assessment (LCA). This report has been designed as a guideline to support LCA practitioners in the systematic identification of the most appropriate electricity mixes for LCA applications. A detailed checklist has been developed for this purpose. It includes the following items: type of electricity supply (from the net, self production, direct contracts); voltage level; country/place of utilisation; year of utilisation; season/daytime of utilisation; import/export model; and, marginal vs. average approach. A few examples, utilising published LCA studies, illustrate the impacts of the insights gained in the present work. Although primarily aimed at applications in Switzerland, the main concepts, the modelling and parts of the information provided can also be applied to other European countries. In addition to the three models proposed earlier for the assessment of the Swiss yearly average electricity mix, a new model (M4) has been developed in the frame of the present task in order to take into account the conditions characteristic for Switzerland as a transit land for electricity trades between its neighbour countries. All existing electricity mix models as well as selected environmental inventories are described and compared in the report. As an example of results, the CO 2 emissions calculated for the Swiss yearly electricity supply mix are relatively small (48 g/kWh with model M4, as compared with 497 g/kWh for the average UCPTE mix). Key information on the structure of electricity generation and trade in Europe is provided. The modelling of the electricity supply for most of the European countries is less sensitive to the choice of an electricity model than for Switzerland. Considering that

  1. Electricity distribution industry restructuring, electrification, and competition in South Africa

    International Nuclear Information System (INIS)

    Galen, P.S.

    1997-07-01

    This paper reviews the status of the South African electricity supply industry (ESI) and proposals for reorienting and restructuring it. South Africa has been intensely examining its ESI for more than 4 years in an effort to determine whether and how it should be restructured to best support the country's new economic development and social upliftment goals. The debate has been spirited and inclusive of most ESI stakeholders. The demands on and expectations for the ESI are many and varied. The debate has reflected this diversity of interests and views. In essence, however, there is a consensus on what is expected of the industry, namely, to extend provision of adequate, reliable, and affordable electricity service to all citizens and segments of the economy. This means a large-scale electrification program to reach as many of the nearly 50% of households currently without electricity service as soon as possible, tariff reform to promote equity and efficiency, and the upgrading of service quality now being provided by some of the newly consolidated municipal authorities. The issues involved are how best to achieve these results within the context of the national Reconstruction and Development Program, while accounting for time and resource constraints and balancing the interests of the various parties

  2. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  3. Project W-519 CDR supplement: Raw water and electrical services for privatization contractor, AP tank farm operations

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This supplement to the Project W-519 Conceptual Design will identify a means to provide RW and Electrical services to serve the needs of the TWRS Privatization Contractor (PC) at AP Tank Farm as directed by DOE-RL. The RW will serve the fire suppression and untreated process water requirements for the PC. The purpose of this CDR supplement is to identify Raw Water (RW) and Electrical service line routes to the TWRS Privatization Contractor (PC) feed delivery tanks, AP-106 and/or AP-108, and establish associated cost impacts to the Project W-519 baseline

  4. Optimal pricing of transmission and distribution services in electricity supply

    International Nuclear Information System (INIS)

    Farmer, E.D.; Cory, B.J.; Perera, B.L.P.P.

    1995-01-01

    A new strategy for the separate pricing of transmission and distribution services in electricity supply is formulated and evaluated. The proposed methodology is a multivariate transmission generalisation of the method of peak load pricing previously applied to the optimal time-of-use pricing of generation on a power system with diverse generation technologies and with elastic demand. The method allocates both capacity and operational costs on a time-of-use basis, in an optimal manner, that avoids cross-subsidisation both between differing supply system participants and differing times of usage. The method is shown to promote the optimal development of the transmission, distribution or interconnecting systems, rewarding justified investments in transmission capacity and discouraging overinvestment. It also leads to appropriate returns on invested capital without significant 'revenue reconciliation'. This contrasts with SRMC pricing as is shown by a comparative revenue evaluation. It is concluded that the method has wide potential application in electricity supply. (author)

  5. The welfare effects of integrating renewable energy into electricity markets

    Science.gov (United States)

    Lamadrid, Alberto J.

    The challenges of deploying more renewable energy sources on an electric grid are caused largely by their inherent variability. In this context, energy storage can help make the electric delivery system more reliable by mitigating this variability. This thesis analyzes a series of models for procuring electricity and ancillary services for both individuals and social planners with high penetrations of stochastic wind energy. The results obtained for an individual decision maker using stochastic optimization are ambiguous, with closed form solutions dependent on technological parameters, and no consideration of the system reliability. The social planner models correctly reflect the effect of system reliability, and in the case of a Stochastic, Security Constrained Optimal Power Flow (S-SC-OPF or SuperOPF), determine reserve capacity endogenously so that system reliability is maintained. A single-period SuperOPF shows that including ramping costs in the objective function leads to more wind spilling and increased capacity requirements for reliability. However, this model does not reflect the inter temporal tradeoffs of using Energy Storage Systems (ESS) to improve reliability and mitigate wind variability. The results with the multiperiod SuperOPF determine the optimum use of storage for a typical day, and compare the effects of collocating ESS at wind sites with the same amount of storage (deferrable demand) located at demand centers. The collocated ESS has slightly lower operating costs and spills less wind generation compared to deferrable demand, but the total amount of conventional generating capacity needed for system adequacy is higher. In terms of the total system costs, that include the capital cost of conventional generating capacity, the costs with deferrable demand is substantially lower because the daily demand profile is flattened and less conventional generation capacity is then needed for reliability purposes. The analysis also demonstrates that the

  6. New electricity generating installations - Czech experience

    International Nuclear Information System (INIS)

    Biza, K.; Pazdera, F.; Zdarek, J.

    2004-01-01

    Economically and technically are analysed alternatives for new electricity generation installations (GEN 111+ NPPs, finalization of NPPs under construction, lifetime extension of existing NPPs, coal plants and gas plants). Described are experienced with NPP Temelin (lessons learned from its design, construction, start-up and resent operation and service experience) and new Czech Energy Policy, where the nuclear energy is an important source for electricity generation. Discussed is also impact of potential trading with CO 2 limits and strategy on minimization of dependence on energy from politically unstable regions. Underlined is important role of preparation of young generation for safe and reliable long term operation of NPPs. General recommendation is to orient on finalization of NPPs under construction, lifetime extension of existing NPPs and long term orientation on new generation of NPPs (GEN III+ and GEN IV). (author)

  7. The Validity and Reliability Studies of the Internet Use of Pre-Service English Teachers Survey: A Turkish Context

    Directory of Open Access Journals (Sweden)

    Gülşah Külekçi

    2011-11-01

    Full Text Available As the availability of computers and the Internet in schools and classrooms has grown, so has interest in the extent to which these technologies are being used and for what purposes. Recently there has been many studies on teachers’ use of education technology in their classrooms and schools, the availability of this technology in their classrooms and schools, their training and preparation for their use and the barriers to technology use they encounter. Using the Internet effectively and the success of the Internet utilization is very much related to the users’ attitudes toward the Internet. This study aims at investigating the reliability and the validity of the Internet Use of Pre-service English Teachers Survey modified from the Master Thesis of Sudsuang Yutdhana. The survey contains two subscales as Internet Attitude Scale and Self-perception of Computing Skills. The survey was administered to randomly selected third and fourth year 96 pre – service English Teachers at Dokuz Eylül University Buca, Faculty of Education, Department of English Language Teaching. The results indicated that Internet Use of Pre-service English Teachers Survey (IUPETS is reliable and valid.

  8. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex E - Report of the electric Equipment Service

    International Nuclear Information System (INIS)

    Sanovic, V.; Stamenkovic, D.

    1985-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  9. Analysis and quality of service evaluation of a fast charging station for electric vehicles

    International Nuclear Information System (INIS)

    Zenginis, Ioannis; Vardakas, John S.; Zorba, Nizar; Verikoukis, Christos V.

    2016-01-01

    Electrification of transportation is considered as one of the most promising ways to mitigate climate change and reduce national security risks from oil and gasoline imports. Fast charging stations that provide high quality of service will facilitate the wide market penetration of electric vehicles. In this paper, the operation of a fast charging station is analyzed by employing a novel queuing model. The proposed analysis considers that the various electric vehicle models are classified by their battery size, and computes the customers' mean waiting time in the queue by taking into account the available charging spots, as well as the stochastic arrival process and the stochastic recharging needs of the various electric vehicle classes. Furthermore, a charging strategy is proposed according to which the drivers are motivated to limit their energy demands. The implementation of the proposed strategy allows the charging station to serve more customers without any increase in the queue waiting time. The high precision of the present analytical model is confirmed through simulations. Therefore, it may be utilized by existing fast charging station operators that need to provide high quality of service, or by future investors that need to design an efficient installation. - Highlights: • A fast charging station for multiple classes of electric vehicles is presented and analyzed. • A novel multiclass queuing model is presented for the mean queue waiting time derivation. • The system's arrival rate capacity is derived given a maximum tolerable waiting time limit. • A charging strategy is proposed aiming at increasing the system's arrival rate capacity. • The charging station operator's revenue is calculated based on the energy drawn by the electric vehicles.

  10. Electric Vehicles in Power Systems with 50% Wind Power Penetration

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Foosnæs, Anders; Xu, Zhao

    2009-01-01

    will be an important balancing measure to enable the Danish government’s energy strategy, which implies 50% wind power penetration in the electric power system. An EV will be a storage device for smoothing power fluctuations from renewable resources especially wind power and provide valuable system services...... for a reliable power system operation. Cost-benefit analysis shows that intelligent bidirectional charging – vehicle to grid (V2G) – provides a socio-economic profit of 150 million Euro/year in the Danish electric power system in 2025 assuming that 15% of the Danish road transport need is supplied by electricity....... This paper analyse the potential for using EVs in Denmark and identify the benefits of the electric power system with high wind power generation by intelligent charging of the EVs. Based on the analysis important technology gabs are identified, and the corresponding research and development initiatives...

  11. 77 FR 49441 - Electricity Advisory Committee

    Science.gov (United States)

    2012-08-16

    ... recommendations to the Assistant Secretary for Electricity Delivery and Energy Reliability on programs to modernize the Nation's electric power system. Additionally, the renewal of the EAC has been determined to be... Energy Reliability, Department of Energy. ACTION: Notice of Renewal. SUMMARY: Pursuant to Section 14(a)(2...

  12. Architecture, design and protection of electrical distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Sorrel, J.P. [Schneider electric Industries SA (France)

    2000-07-01

    Architectures related to AII Electric Ship (AES) require high level of propulsion power. Merchant ships and obviously warships require a low vulnerability, a high reliability and availability, a simple maintainability as well as an ordinary ode of operation. These constraints converge to an optimum single line diagram. We will focus on the mode of operation of the network, its constraints, the facilities to use a ring distribution for the ship service distribution system, the earthing of HV network as well as future developments. (author)

  13. 75 FR 72664 - System Personnel Training Reliability Standards

    Science.gov (United States)

    2010-11-26

    ...--Staffing). \\2\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 72 FR 16416 (Apr... on the North American bulk electric system are competent to perform those reliability-related tasks... PER-004-2 will achieve a significant improvement in the reliability of the Bulk- Power System and...

  14. Microgrid and Plug in Electric Vehicle (PEV) with Vehicle to Grid (V2G) Power Services Capability (Briefing Charts)

    Science.gov (United States)

    2015-09-01

    for public release Microgrid and Plug in Electric Vehicle (PEV) with Vehicle to Grid (V2G) Power Services Capability Shukri Kazbour PEV Lead Engineer...collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 01 SEP 2015 2. REPORT TYPE 3. DATES COVERED...00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Microgrid and Plug in Electric Vehicle (PEV) with Vehicle to Grid (V2G) Power Services Capability

  15. Why We Need Reliable, Valid, and Appropriate Learning Disability Assessments: The Perspective of a Postsecondary Disability Service Provider

    Science.gov (United States)

    Wolforth, Joan

    2012-01-01

    This paper discusses issues regarding the validity and reliability of psychoeducational assessments provided to Disability Services Offices at Canadian Universities. Several vignettes illustrate some current issues and the potential consequences when university students are given less than thorough disability evaluations and ascribed diagnoses.…

  16. The deregulation of the electricity industry : a commercial and industrial perspective from Ontario Hydro's point of view

    International Nuclear Information System (INIS)

    Bojovski, T.

    2000-01-01

    A summary of how consumers will be affected by the newly opened competitive electricity market in Ontario was presented. Consumers will be able to choose their suppliers of electricity and will have the option to buy packages which may include natural gas and long distance telephone service. Licensed wholesalers will purchase the lowest-cost electricity from power generators anywhere in North America and will have the freedom to charge spot market prices. Ontario Hydro, which has been operating as a monopoly has now been separated into three separate entities including power generation, transmission and distribution, and wholesale market administration through the Ontario Power Generation Inc., Hydro One, and the Independent Market Operator (IMO) respectively. The main objective of this unbundling of services was to bring electricity prices down. An agreement entitled Market Power Mitigation ensures that when competition officially begins, Ontario Power Generation will have to observe a revenue cap on a fixed amount of energy and allow new suppliers to act as providers of electricity. As electrical power demand increases there are concerns over power reliability and costly power outages. 2 figs

  17. An Iterative Algorithm for the Management of an Electric Car-Rental Service

    Directory of Open Access Journals (Sweden)

    J. Alberto Conejero

    2014-01-01

    Full Text Available The management of a car-rental service becomes more complex as long as one-way bookings between different depots are accepted. These bookings can increase the operational costs due to the necessity of moving vehicles from one depot to another by the company staff in order to attend previously accepted bookings. We present an iterative model based on flows on networks for the acceptance of bookings by a car-rental service that permits one-way reservations. Our model lets us also recover the movement of the fleet of vehicles between the depots over the time. In addition, it also permits including restrictions on the amount of cars managed at every single depot. These results can be of interest for an electric car-rental service that operates at different depots within a city or region.

  18. Aerospace reliability applied to biomedicine.

    Science.gov (United States)

    Lalli, V. R.; Vargo, D. J.

    1972-01-01

    An analysis is presented that indicates that the reliability and quality assurance methodology selected by NASA to minimize failures in aerospace equipment can be applied directly to biomedical devices to improve hospital equipment reliability. The Space Electric Rocket Test project is used as an example of NASA application of reliability and quality assurance (R&QA) methods. By analogy a comparison is made to show how these same methods can be used in the development of transducers, instrumentation, and complex systems for use in medicine.

  19. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1988-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  20. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1990-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  1. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1987-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  2. Island operation capability in the Colombian electrical market: a promising ancillary service of distributed energy resources

    DEFF Research Database (Denmark)

    Marín-Jiménez, Juan D.; Carvajal-Quintero, Sandra; Guerrero, Josep M.

    2018-01-01

    is presented. Subsequently, an existing electrical distribution system with small hydropower plants is considered as a study case in order to identify the technical requirements set out for both, the distribution system and the generation source. Finally, taking into account the current Law and regulations......, a proposal is outlined for the implementation of the island operation capability ancillary service in the Colombian electrical system....

  3. Report of the electric equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V; Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1983-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  4. Funding for universal service obligations in electricity sector: the case of green power development

    International Nuclear Information System (INIS)

    Favard, P.; Mirabel, F.; Poudou, J.Ch.

    2002-07-01

    The process of deregulation in network industries, in particular in the electric sector, raises the problem of financing the Universal Service Obligations (USO) corresponding to the production, transport and distribution operations. In this paper, we study three ways of funding for an USO of production, especially the 'green' electricity development; the financing with cross-subsidies, the implementation of a fund (financing by a tax) and finally a voluntary funding system by direct subscriptions of consumers. We notably show that this last one Pareto dominates mostly, from a welfare point of view, the other scenarios. (authors)

  5. Enhancing Communication Skills of Pre-service Physics Teacher through HOT Lab Related to Electric Circuit

    Science.gov (United States)

    Malik, A.; Setiawan, A.; Suhandi, A.; Permanasari, A.; Dirgantara, Y.; Yuniarti, H.; Sapriadil, S.; Hermita, N.

    2018-01-01

    This study aimed to investigate the improvement to pre-service teacher’s communication skills through Higher Order Thinking Laboratory (HOT Lab) on electric circuit topic. This research used the quasi-experiment method with pretest-posttest control group design. Research subjects were 60 students of Physics Education in UIN Sunan Gunung Djati Bandung. The sample was chosen by random sampling technique. Students’ communication skill data collected using a communication skills test instruments-essays form and observations sheets. The results showed that pre-service teacher communication skills using HOT Lab were higher than verification lab. Student’s communication skills in groups using HOT Lab were not influenced by gender. Communication skills could increase due to HOT Lab based on problems solving that can develop communication through hands-on activities. Therefore, the conclusion of this research shows the application of HOT Lab is more effective than the verification lab to improve communication skills of pre-service teachers in electric circuit topic and gender is not related to a person’s communication skills.

  6. Reliability Assessment Of Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2014-01-01

    Reduction of cost of energy for wind turbines are very important in order to make wind energy competitive compared to other energy sources. Therefore the turbine components should be designed to have sufficient reliability but also not be too costly (and safe). This paper presents models...... for uncertainty modeling and reliability assessment of especially the structural components such as tower, blades, substructure and foundation. But since the function of a wind turbine is highly dependent on many electrical and mechanical components as well as a control system also reliability aspects...... of these components are discussed and it is described how there reliability influences the reliability of the structural components. Two illustrative examples are presented considering uncertainty modeling, reliability assessment and calibration of partial safety factors for structural wind turbine components exposed...

  7. Pomen managementa na dereguliranem maloprodajnem trgu električne energije v Sloveniji = The Importance of Management in the Deregulated Retail Electricity Distribution Market in Slovenia

    Directory of Open Access Journals (Sweden)

    Drago Papler

    2006-12-01

    Full Text Available This paper underlines the importance of management in the deregulated retail electricity distribution market, entrepreneurship and business behaviours toward consumers’ satisfaction with quality of services. The coefficients of concentration indicate a high concentration of electricity suppliers and users in the deregulated electricity retail market for industry. The production function reveals the importance of education and electricity infrastructure, and to a lesser extent of capital intensity, in labour productivity growth in the retail electricity distribution enterprise. Electricity demand in industry is determined positively by real income growth and negatively by real electricity price increases. Multivariate factor analysis confirms two main common components of efficient retail electricity supply and satisfaction of consumers in industry. In the first group of factors of efficient retail electricity supply the highest weights are for consumption, quality of services, expenses and advice. In the second group of factors of consumers’ satisfaction the highest weights are for response, needs, reliability and personnel. The impacts of changes in the dynamics of competition in the deregulated retail electricity market on management and organisational behaviours are found significant for quality of services, marketing and marketing strategies, supply-chain and customer relationship management.

  8. 78 FR 71448 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Science.gov (United States)

    2013-11-29

    ...; Order No. 789] Regional Reliability Standard BAL-002-WECC-2--Contingency Reserve AGENCY: Federal Energy... (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and Western Electricity... Region and is meant to specify the quantity and types of [[Page 71449

  9. 78 FR 27113 - Version 5 Critical Infrastructure Protection Reliability Standards

    Science.gov (United States)

    2013-05-09

    ... approve certain reliability standards proposed by the North American Electric Reliability Corporation... Infrastructure Protection Reliability Standards, 143 FERC ] 61,055 (2013). This errata notice serves to correct P... Commission 18 CFR Part 40 [Docket No. RM13-5-000] Version 5 Critical Infrastructure Protection Reliability...

  10. Evaluation of Public Service Electric & Gas Company`s standard offer program, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Kito, M.S.; Moezzi, M.M.

    1995-07-01

    In May 1993, Public Service Electric and Gas (PSE&G), the largest investor-owned utility in New Jersey, initiated the Standard Offer program, an innovative approach to acquiring demand-side management (DSM) resources. In this program, PSE&G offers longterm contracts with standard terms and conditions to project sponsors, either customers or third-party energy service companies (ESCOs), on a first-come, first-serve basis to fill a resource block. The design includes posted, time-differentiated prices which are paid for energy savings that will be verified over the contract term (5, 10, or 15 years) based on a statewide measurement and verification (M&V) protocol. The design of the Standard Offer differs significantly from DSM bidding programs in several respects. The eligibility requirements and posted prices allow ESCOs and other energy service providers to market and develop projects among customers with few constraints on acceptable end use efficiency technologies. In contrast, in DSM bidding, ESCOs typically submit bids without final commitments from customers and the utility selects a limited number of winning bidders who often agree to deliver a pre-specified mix of savings from various end uses in targeted markets. The major objectives of the LBNL evaluation were to assess market response and customer satisfaction; analyze program costs and cost-effectiveness; review and evaluate the utility`s administration and delivery of the program; examine the role of PSE&G`s energy services subsidiary (PSCRC) in the program and the effect of its involvement on the development of the energy services industry in New Jersey; and discuss the potential applicability of the Standard Offer concept given current trends in the electricity industry (i.e., increasing competition and the prospect of industry restructuring).

  11. Review of the human reliability analysis performed for Empire State Electric Energy Research Corporation

    International Nuclear Information System (INIS)

    Swart, D.; Banz, I.

    1985-01-01

    The Empire State Electric Energy Research Corporation (ESEERCO) commissioned Westinghouse to conduct a human reliability analysis to identify and quantify human error probabilities associated with operator actions for four specific events which may occur in light water reactors: loss of coolant accident, steam generator tube rupture, steam/feed line break, and stuck open pressurizer spray valve. Human Error Probabilities (HEPs) derived from Swain's Technique for Human Error Rate Prediction (THERP) were compared to data obtained from simulator exercises. A correlation was found between the HEPs derived from Swain and the results of the simulator data. The results of this study provide a unique insight into human factors analysis. The HEPs obtained from such probabilistic studies can be used to prioritize scenarios for operator training situations, and thus improve the correlation between simulator exercises and real control room experiences

  12. Report of the Service for maintenance of electric equipment Service - Annex 3; Prilog 3 - Rad sluzbe za odrzavanje elektro opreme reaktora RA u 1975. godini

    Energy Technology Data Exchange (ETDEWEB)

    Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  13. 77 FR 7526 - Interpretation of Protection System Reliability Standard

    Science.gov (United States)

    2012-02-13

    ... Federal Power Act (FPA) requires a Commission-certified Electric Reliability Organization (ERO) to develop.... Cir. 2009). \\8\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats... a person that is ``directly and materially affected'' by Bulk-Power System reliability may request...

  14. Reliability and Cost Impacts for Attritable Systems

    Science.gov (United States)

    2017-03-23

    on reliability and cost: a probabilistic model. Electric Power Systems Research, 72(3), 213-224. Kalbfleisch, J.D. & Prentice, R.L. (1980). The...copyright protection in the United States. AFIT-ENV-MS-17-M-172 RELIABILITY AND COST IMPACTS FOR ATTRITABLE SYSTEMS THESIS Presented to... power of discrete time Markov chains, whether homogeneous or non-homogeneous, to model the reliability and dependability of repairable systems should

  15. Reliability and Validity of Survey Instruments to Measure Work-Related Fatigue in the Emergency Medical Services Setting: A Systematic Review

    Science.gov (United States)

    2018-01-11

    Background: This study sought to systematically search the literature to identify reliable and valid survey instruments for fatigue measurement in the Emergency Medical Services (EMS) occupational setting. Methods: A systematic review study design wa...

  16. Methodology for reliability based condition assessment

    International Nuclear Information System (INIS)

    Mori, Y.; Ellingwood, B.

    1993-08-01

    Structures in nuclear power plants may be exposed to aggressive environmental effects that cause their strength to decrease over an extended period of service. A major concern in evaluating the continued service for such structures is to ensure that in their current condition they are able to withstand future extreme load events during the intended service life with a level of reliability sufficient for public safety. This report describes a methodology to facilitate quantitative assessments of current and future structural reliability and performance of structures in nuclear power plants. This methodology takes into account the nature of past and future loads, and randomness in strength and in degradation resulting from environmental factors. An adaptive Monte Carlo simulation procedure is used to evaluate time-dependent system reliability. The time-dependent reliability is sensitive to the time-varying load characteristics and to the choice of initial strength and strength degradation models but not to correlation in component strengths within a system. Inspection/maintenance strategies are identified that minimize the expected future costs of keeping the failure probability of a structure at or below an established target failure probability during its anticipated service period

  17. Citizen and consumer attitudes towards electricity industry restructuring : an Ontario (Canada) case-study

    International Nuclear Information System (INIS)

    Rowlands, I.; Parker, P.; Scott, D.

    2001-01-01

    This report examines public attitudes regarding electricity restructuring in Ontario. A survey from the Waterloo region in western Ontario provided responses to questions about attitudes towards restructuring and strategies for advancing environmental goals. A 158-item survey was sent to 1,110 individuals, between September 2000 and April 2001. A total of 474 questionnaires were answered, for a response rate of 43 per cent. It was noted that although the response rate was high, the survey may not be representative because the respondents were older, better educated, and wealthier than the general population. In addition, the respondents had previously indicated they were willing to pay $25 for a home energy evaluation, suggesting a special interest in issues regarding energy and the environment. Respondents were first asked whether they agreed, disagreed or were not sure about the need to restructure, whether a single government power company should supply electricity, or whether they were pleased to choose a power company of their choice. The respondents were then asked to rank the importance of the price of electricity, the quality of customer service, whether the electricity is generated in southern Ontario, the environmental effects of the electricity produced by the company, the reputation of the company, and reliability of electricity. Price and reliability ranked as the highest priorities by respondents. Citizens' attitudes toward premium-priced green electricity were also examined. The general conclusion was that while many respondents wanted a sustainable electricity system, most of them will look for the cheapest electricity product once the market is opened. 6 refs., 3 tabs

  18. State Electricity Regulatory Policy and Distributed Resources: Distributed Resources and Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Cowart, R.; Harrington, C.; Moskovitz, D.; Shirley, W.; Weston, F.; Sedano, R.

    2002-10-01

    Designing and implementing credit-based pilot programs for distributed resources distribution is a low-cost, low-risk opportunity to find out how these resources can help defer or avoid costly electric power system (utility grid) distribution upgrades. This report describes implementation options for deaveraged distribution credits and distributed resource development zones. Developing workable programs implementing these policies can dramatically increase the deployment of distributed resources in ways that benefit distributed resource vendors, users, and distribution utilities. This report is one in the State Electricity Regulatory Policy and Distributed Resources series developed under contract to NREL (see Annual Technical Status Report of the Regulatory Assistance Project: September 2000-September 2001, NREL/SR-560-32733). Other titles in this series are: (1) Accommodating Distributed Resources in Wholesale Markets, NREL/SR-560-32497; (2) Distributed Resources and Electric System Re liability, NREL/SR-560-32498; (3) Distribution System Cost Methodologies for Distributed Generation, NREL/SR-560-32500; (4) Distribution System Cost Methodologies for Distributed Generation Appendices, NREL/SR-560-32501.

  19. Reliability evaluation for offshore wind farms

    DEFF Research Database (Denmark)

    Zhao, Menghua; Blåbjerg, Frede; Chen, Zhe

    2005-01-01

    In this paper, a new reliability index - Loss Of Generation Ratio Probability (LOGRP) is proposed for evaluating the reliability of an electrical system for offshore wind farms, which emphasizes the design of wind farms rather than the adequacy for specific load demand. A practical method...... to calculate LOGRP of offshore wind farms is proposed and evaluated....

  20. Simulations of scenarios with 100% renewable electricity in the Australian National Electricity Market

    International Nuclear Information System (INIS)

    Elliston, Ben; Diesendorf, Mark; MacGill, Iain

    2012-01-01

    As a part of a program to explore technological options for the transition to a renewable energy future, we present simulations for 100% renewable energy systems to meet actual hourly electricity demand in the five states and one territory spanned by the Australian National Electricity Market (NEM) in 2010. The system is based on commercially available technologies: concentrating solar thermal (CST) power with thermal storage, wind, photovoltaic (PV), existing hydro and biofuelled gas turbines. Hourly solar and wind generation data are derived from satellite observations, weather stations, and actual wind farm outputs. Together CST and PV contribute about half of total annual electrical energy supply. A range of 100% renewable energy systems for the NEM are found to be technically feasible and meet the NEM reliability standard. The principal challenge is meeting peak demand on winter evenings following overcast days when CST storage is partially charged and sometimes wind speeds are low. The model handles these circumstances by combinations of an increased number of gas turbines and reductions in winter peak demand. There is no need for conventional base-load power plants. The important parameter is the reliability of the whole supply-demand system, not the reliability of particular types of power plants. - Highlights: ► We simulate 100% renewable electricity in the Australian National Electricity Market. ► The energy system comprises commercially available technologies. ► A range of 100% renewable electricity systems meet the reliability standard. ► Principal challenge is meeting peak demand on winter evenings. ► The concept of ‘base-load’ power plants is found to be redundant.

  1. Test-retest Reliability and Agreement of the Satisfaction with the Assistive Technology Services (SATS) Instrument in Two Nordic Countries

    DEFF Research Database (Denmark)

    Sund, Terje; Anttila, Heidi; Iwarsson, Susanne

    2014-01-01

    Purpose: The purpose of this study was to investigate test–retest reliability, agreement, internal consistency, and floor- and ceiling effects of the Danish and Finnish versions of the Satisfaction with the Assistive Technology Services (SATS) instrument among adult users of powered wheelchairs (...

  2. 18 CFR 292.308 - Standards for operating reliability.

    Science.gov (United States)

    2010-04-01

    ... reliability. 292.308 Section 292.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying... may establish reasonable standards to ensure system safety and reliability of interconnected...

  3. Cost benefit justification of nuclear plant reliability improvement

    International Nuclear Information System (INIS)

    El-Sayed, M.A.H.; Abdelmonem, N.M.

    1986-01-01

    Nuclear power costs are evaluated on the bases of general ground rules (a) vary from time to time (b) vary from country to another (c) even vary from one reactor type to another. The main objective of an electric utility is to provide the electric energy to the different consummers at the lowest possible cost with reasonable reliability level. Rapid increase of the construction costs and fuel prices in recent years have stimulated a great deal of interest in improving the reliability and productivity of new and existing power plants. One of the most important areas is the improvement of the secondary steam loop and the reactor cooling system. The method for evaluating the reliability of steam loop and cooling system utilizes the cut-set technique. The developed method can be easily used to show to what extent the overall reliability of the nuclear plant is affected by the possible failures in the steam and cooling subsystem. The cost reliability trade-off analysis is used to evaluate alternative schemes in the design with a view towards meeting a high reliability goal. Based on historical or estimated failure and repair rate, the reliability of the alternate scheme can be calculated

  4. Funding for universal service obligations in electricity sector: the case of green power development

    Energy Technology Data Exchange (ETDEWEB)

    Favard, P.; Mirabel, F.; Poudou, J.Ch

    2002-07-01

    The process of deregulation in network industries, in particular in the electric sector, raises the problem of financing the Universal Service Obligations (USO) corresponding to the production, transport and distribution operations. In this paper, we study three ways of funding for an USO of production, especially the 'green' electricity development; the financing with cross-subsidies, the implementation of a fund (financing by a tax) and finally a voluntary funding system by direct subscriptions of consumers. We notably show that this last one Pareto dominates mostly, from a welfare point of view, the other scenarios. (authors)

  5. 78 FR 803 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-01-04

    ... Bulk 74. Electric System 1. Inclusion I1 (Transformers) 75. Commission Determination 80. 2. Inclusion... configurations are included in the bulk electric system. Inclusions: I1--Transformers with the primary terminal... bulk electric system. 15. NERC explained that inclusion I1 includes transformers with the primary...

  6. A Comparative Assessment of Life-Cycle Greenhouse Gas Emissions from Hypothetical Electric Airport Transportation Services in Thailand

    Science.gov (United States)

    Koiwanit, J.

    2018-05-01

    Global warming is an increase of average temperature in the atmosphere, which causes adverse effects on the environment. Carbon dioxide (CO2) from transportation sector is one of the main contributors of the overall greenhouse gases (GHG). To cope with this issue, electric car services are increasingly seen as popular alternative modes of green transportation especially for urban cities as it is more flexible, more environmentally-friendly, and less expensive than the use of conventional vehicles. The study analyses and compare the hypothetical electric car systems from airport transportation services. Center of Environmental Science of Leiden University (CML) 2001, the Life Cycle Impact Assessment (LCIA) method, is applied to convert life cycle inventory data into environmental impacts. The observed results showed that the electric shuttle bus had the highest impact in global warming potential (GWP) compared to other transportation types. Alternatively, this Life Cycle Assessment (LCA) study that evaluated different transportations provided important information for decision makers on quantifying the differences between each scenario.

  7. Measuring Passenger Travel Time Reliability using Smartcard Data

    NARCIS (Netherlands)

    Bagherian, M.; Cats, O.; van Oort, N.; Hickman, M

    2016-01-01

    Service reliability is a key performance measure for transit agencies in increasing their service quality and thus ridership. Conventional reliability metrics are established based on vehicle movements and thus do not adequately reflect passenger’s experience. In the past few years, the growing

  8. Nodal price volatility reduction and reliability enhancement of restructured power systems considering demand-price elasticity

    International Nuclear Information System (INIS)

    Goel, L.; Wu, Qiuwei; Wang, Peng

    2008-01-01

    With the development of restructured power systems, the conventional 'same for all customers' electricity price is getting replaced by nodal prices. Electricity prices will fluctuate with time and nodes. In restructured power systems, electricity demands will interact mutually with prices. Customers may shift some of their electricity consumption from time slots of high electricity prices to those of low electricity prices if there is a commensurate price incentive. The demand side load shift will influence nodal prices in return. This interaction between demand and price can be depicted using demand-price elasticity. This paper proposes an evaluation technique incorporating the impact of the demand-price elasticity on nodal prices, system reliability and nodal reliabilities of restructured power systems. In this technique, demand and price correlations are represented using the demand-price elasticity matrix which consists of self/cross-elasticity coefficients. Nodal prices are determined using optimal power flow (OPF). The OPF and customer damage functions (CDFs) are combined in the proposed reliability evaluation technique to assess the reliability enhancement of restructured power systems considering demand-price elasticity. The IEEE reliability test system (RTS) is simulated to illustrate the developed techniques. The simulation results show that demand-price elasticity reduces the nodal price volatility and improves both the system reliability and nodal reliabilities of restructured power systems. Demand-price elasticity can therefore be utilized as a possible efficient tool to reduce price volatility and to enhance the reliability of restructured power systems. (author)

  9. A roadmap for production of sustainable, consistent and reliable electric power from agricultural biomass- An Indian perspective

    International Nuclear Information System (INIS)

    Singh, Jaswinder

    2016-01-01

    The utilization of agricultural biomass for production of electric power can help to reduce the environmental emissions while achieving energy security and sustainable development. This paper presents a methodology for estimating the power production potential of agricultural biomass in a country. Further, the methodology has been applied to develop a roadmap for producing reliable power in India. The present study reveals that about 650 Mt/year of agricultural biomass is generated in India, while about one-third of this has been found to be surplus for energy applications. The cereal crops have major contribution (64.60%) in production of surplus biomass followed by sugarcane (24.60%) and cotton (10.68%). The energy potential of these resources is of the order of 3.72 EJ, which represents a significant proportion of the primary energy consumption in the country. These biomass resources can produce electric power of 23–35 GW depending upon the efficiency of thermal conversion. The delivery of biomass to the plants and selection of appropriate technology have been found as the major issues that need to be resolved carefully. In the end, the study summarizes various technological options for biomass collection and utilization that can be used for producing clean and consistent power supply. - Highlights: •The production of bioelectricity in India is imperative and inevitable. •About one-third of the agricultural biomass is available for power generation. •The power potential of these resources is of the order of 23–31 GW. •The delivery of biomass to plants and technology selection are the key issues. •India should exploit these resources for producing clean and reliable power.

  10. Optimization of NPP performance and service life in a competitive electricity market

    International Nuclear Information System (INIS)

    Gueorguiev, B.; Spielgelberg - Planner, R.

    2000-01-01

    This paper discusses how the competitive electricity market has influenced nuclear power plant operations, with a focus on optimisation of NPP performance and plant service life, and how the IAEA programme has addressed some of this issues. The definitions of Plant Life, Operational Life, Design Life and Periodical Safety Reviews are developed in the paper in order to differentiate between the terms and to show the significance in terms of Plant Life Management

  11. Photovoltaic performance and reliability workshop

    Energy Technology Data Exchange (ETDEWEB)

    Mrig, L. [ed.

    1993-12-01

    This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

  12. Risk-based Optimization and Reliability Levels of Coastal Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Burcharth, H. F.

    Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure, in...... on the minimumcost reliability levels is investigated for different values of the real rate of interest, the service lifetime, the downtime costs due to malfunction and the decommission costs.......Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure...

  13. Risk-based Optimization and Reliability Levels of Coastal Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Burcharth, Hans F.

    2005-01-01

     Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure, i...... on the minimumcost reliability levels is investigated for different values of the real rate of interest, the service lifetime, the downtime costs due to malfunction and the decommission costs....... Identification of optimum reliability levels for coastal structures is considered. A class of breakwaters is considered where no human injuries can be expected in cases of failure. The optimum reliability level is identified by minimizing the total costs over the service life of the structure...

  14. Structural Reliability Analysis of Wind Turbines: A Review

    Directory of Open Access Journals (Sweden)

    Zhiyu Jiang

    2017-12-01

    Full Text Available The paper presents a detailed review of the state-of-the-art research activities on structural reliability analysis of wind turbines between the 1990s and 2017. We describe the reliability methods including the first- and second-order reliability methods and the simulation reliability methods and show the procedure for and application areas of structural reliability analysis of wind turbines. Further, we critically review the various structural reliability studies on rotor blades, bottom-fixed support structures, floating systems and mechanical and electrical components. Finally, future applications of structural reliability methods to wind turbine designs are discussed.

  15. Preparing for climate change regulation : an assessment of the current state of date reliability in the Canadian electrical industry

    International Nuclear Information System (INIS)

    Schuh, C.

    2003-01-01

    This presentation provided an overview of current Canadian greenhouse gas (GHG) reporting requirements, predictions about GHG regulations, and the current state of GHGs data reliability in the Canadian electrical industry. The author argued that while potential management strategies are necessary, they are not sufficient to meet Kyoto or similar types of initiatives because they do not provide incentives for reductions, they do not establish accountability, nor do they encourage reliable data. It was predicted that the first climate change regulation will be a sectoral agreement enacted at the federal/provincial level. It was also predicted that future regulations will include a requirement to report GHG emissions in a reliable manner and that regulators will use the data to track performance. The final prediction was that the onus will be on the companies to prove that the data is reliable as regulators will have limited resources to check the data. It was noted that the current state of data is not suitable for analytical testing because of a lack of clear definitions, a lack of industry comparison, inability to compare between companies, inability to compare between different types of power generation, and the inability to compare between years. It was suggested that data reliability could be improved by having the regulators review and monitor the reported data, or by having a third party review and provide assurance on the reported data. It was concluded that there will have to be agreement at the industry level on common measurement and calculation methodology, as well as an agreement on a common scope of reporting. 4 figs

  16. Efforts to improve safety and reliability of nuclear power plants in Kyushu Electric Power

    International Nuclear Information System (INIS)

    Yamamoto, Satoshi

    2014-01-01

    After the Fukushima accident, Kyushu Electric Power Co. took emergency safety measures requested by government to ensure power supply, coolant supply pumps and cooling water so as to keep cooling fuels in the reactor and spent fuel storage pool in case of losses of ordinary cooling capability caused by earthquake and tsunami. In order to improve safety and reliability of nuclear power plants, further efforts based on lessons learned from the Fukushima accident had been made to diversify corresponding equipment of safety measures in terms of prevention of core damage, prevention of containment failure, mitigation of radioactive materials release, cooling of spent fuel pit and ensurance of power supply, and to enhance emergency response capability so as to make operational management more complete. Additional safety measures applicable to new regulatory requirements against severe accidents were in progress. This article introduced details of such activities. (T. Tanaka)

  17. Quantifying the value of hydropower in the electric grid : role of hydropower in existing markets.

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne W.

    2011-01-01

    The electrical power industry is facing the prospect of integrating a significant addition of variable generation technologies in the next several decades, primarily from wind and solar facilities. Overall, transmission and generation reserve levels are decreasing and power system infrastructure in general is aging. To maintain grid reliability modernization and expansion of the power system as well as more optimized use of existing resources will be required. Conventional and pumped storage hydroelectric facilities can provide an increasingly significant contribution to power system reliability by providing energy, capacity and other ancillary services. However, the potential role of hydroelectric power will be affected by another transition that the industry currently experiences - the evolution and expansion of electricity markets. This evolution to market-based acquisition of generation resources and grid management is taking place in a heterogeneous manner. Some North American regions are moving toward full-featured markets while other regions operate without formal markets. Yet other U.S. regions are partially evolved. This report examines the current structure of electric industry acquisition of energy and ancillary services in different regions organized along different structures, reports on the current role of hydroelectric facilities in various regions, and attempts to identify features of market and scheduling areas that either promote or thwart the increased role that hydroelectric power can play in the future. This report is part of a larger effort led by the Electric Power Research Institute with purpose of examining the potential for hydroelectric facilities to play a greater role in balancing the grid in an era of greater penetration of variable renewable energy technologies. Other topics that will be addressed in this larger effort include industry case studies of specific conventional and hydro-electric facilities, systemic operating constraints

  18. Opening, at the Senate, of the discussion on the public service of the electric power; Ouverture du debat devant le Senat sur le service public de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    This paper presents a chronological account of the talks presented since october 1999 and concerning the public service of the electrical power. The author criticizes the different law articles law of the law project and the government policy in this domain. In particular he analyses:1) the public service missions; 2) the part of EDF as an integrated enterprise of production, transport and distribution of electric power; 3) the public policy of the energy; 4) the gradual and controlled opening of the market to the competition. (A.L.B.)

  19. Electric transmission technology

    International Nuclear Information System (INIS)

    Shah, K.R.

    1990-01-01

    Electric transmission technology has matured and can transmit bulk power more reliably and economically than the technology 10 years ago.In 1882, Marcel Depres transmitted 15 kW electric power at 2 kV, using a constant direct current; present transmission voltages have risen to ± 600 kV direct current (DC) and 765 kV alternating current (AC), and it is now possible to transmit bulk electric power at voltages as high as ± 1000 kV DC and 1500 kV AC. Affordable computer systems are now available to optimize transmission reliably. New materials have reduced the bulk of insulation for lines and equipment. New conducting materials and configurations have reduced losses in transmission. Advances in line structures and conductor motion, understanding of flashover characteristics of insulators and air-gaps and electrical performance of lines have resulted in more compact urban transmission lines. (author). 15 refs., 7 tabs., 11 figs

  20. 76 FR 16277 - System Restoration Reliability Standards

    Science.gov (United States)

    2011-03-23

    ... electric system. Blackstart units are essential to restart generation and restore power to the grid in the... Standard EOP-007-0. \\2\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 72 FR... = $5,894,624. Title: Mandatory Reliability Standards for the Bulk-Power System. Action: FERC 725A...

  1. Electric wiring domestic

    CERN Document Server

    Coker, A J

    1992-01-01

    Electric Wiring: Domestic, Tenth Edition, is a clear and reliable guide to the practical aspects of domestic electric wiring. Intended for electrical contractors, installation engineers, wiremen and students, its aim is to provide essential up to date information on modern methods and materials in a simple, clear, and concise manner. The main changes in this edition are those necessary to bring the work into line with the 16th Edition of the Regulations for Electrical Installations issued by the Institution of Electrical Engineers. The book begins by introducing the basic features of domestic

  2. Evaluation of reliability of on-site A.C. power systems based on maintenance records

    Energy Technology Data Exchange (ETDEWEB)

    Basso, G.; Pia, S. [ENEA/TERM/VAOEC, C.R.E. Casaccla via Anguillarese, 00100 Roma/Rome (Italy); Fusari, W. [ENEL, Rome (Italy); Soressi, G.; Vaccari, G. [ENEL, Centro di Ricerca Termica e Nucl., Via Rubattino, 54, 1-20134 Mllano/Milan (Italy)

    1986-02-15

    To the end of ascertain in what extent the evaluation of reliability of emergency diesel generators (D.G.) can be improved by means of a deeper knowledge of their operating history a study has been carried-out on 21 D.G. sets: 4 D.G. of the Caorso nuclear plant (BWR, 870 MWe) and 17 D.G. in service at 6 steam-electric fossil-fuelled plants. The major points of interest resulting from this study are: 1) reliability assessments of A.C. on-site power Systems, made on the basis of outcomes of surveillance tests, may lead to results which overestimate the real performance. 2) the unreliability of a redundant System of stand-by components is determined in large extent by unavailabilities due to scheduled and unscheduled maintenance, latent failures, tests. (authors)

  3. Evaluation of reliability of on-site A.C. power systems based on maintenance records

    International Nuclear Information System (INIS)

    Basso, G.; Pia, S.; Fusari, W.; Soressi, G.; Vaccari, G.

    1986-01-01

    To the end of ascertain in what extent the evaluation of reliability of emergency diesel generators (D.G.) can be improved by means of a deeper knowledge of their operating history a study has been carried-out on 21 D.G. sets: 4 D.G. of the Caorso nuclear plant (BWR, 870 MWe) and 17 D.G. in service at 6 steam-electric fossil-fuelled plants. The major points of interest resulting from this study are: 1) reliability assessments of A.C. on-site power Systems, made on the basis of outcomes of surveillance tests, may lead to results which overestimate the real performance. 2) the unreliability of a redundant System of stand-by components is determined in large extent by unavailabilities due to scheduled and unscheduled maintenance, latent failures, tests. (authors)

  4. Reliability-Based Code Calibration

    DEFF Research Database (Denmark)

    Faber, M.H.; Sørensen, John Dalsgaard

    2003-01-01

    The present paper addresses fundamental concepts of reliability based code calibration. First basic principles of structural reliability theory are introduced and it is shown how the results of FORM based reliability analysis may be related to partial safety factors and characteristic values....... Thereafter the code calibration problem is presented in its principal decision theoretical form and it is discussed how acceptable levels of failure probability (or target reliabilities) may be established. Furthermore suggested values for acceptable annual failure probabilities are given for ultimate...... and serviceability limit states. Finally the paper describes the Joint Committee on Structural Safety (JCSS) recommended procedure - CodeCal - for the practical implementation of reliability based code calibration of LRFD based design codes....

  5. Measurement of quality in Saudi Arabian service industry

    Energy Technology Data Exchange (ETDEWEB)

    Jannadi, O.A. [King Fahd Univ. of Petroleum and Minerals, Dhahran (Saudi Arabia); Al-Saggaf, H. [SCECO-East (Saudi Arabia)

    2000-10-12

    Quality problems in the service organisation are the result of the mismatch between prior expectation and perceived quality of the service. Each organisation will attempt to determine the requirements of its customers and translate these requirements into product and delivery process specifications. This paper examines a particular electric company (SCECO-East), a typical service provider in Saudi Arabia, in which service quality is a distinguishing feature of primary importance. It describes a detailed survey and analysis in the light of the model put forward by Parasuraman et al. It utilises SERVQUAL for measuring customers' perceptions of service quality. The study revealed that SCECO-East scored high in tangibles dimension but low in features of responsiveness and reliability. In addition, while the performance of SCECO-East was acceptable to all customer categories, service quality was perceived differently by various types of customers, with reinforcement and commercial customers awarding SCECO-East even lower ratings than other customers did. (Author)

  6. 78 FR 76986 - Version 5 Critical Infrastructure Protection Reliability Standards

    Science.gov (United States)

    2013-12-20

    ...; Order No. 791] Version 5 Critical Infrastructure Protection Reliability Standards AGENCY: Federal Energy... 72755). The regulations approved certain reliability standards proposed by the North American Electric... Infrastructure Protection Reliability Standards, 145 FERC ] 61,160 (2013). This errata notice serves to correct P...

  7. Reliability of length measurements collected by community nurses and health volunteers in rural growth monitoring and promotion services.

    Science.gov (United States)

    Laar, Matilda E; Marquis, Grace S; Lartey, Anna; Gray-Donald, Katherine

    2018-02-17

    Length measurements are important in growth, monitoring and promotion (GMP) for the surveillance of a child's weight-for-length and length-for-age. These two indices provide an indication of a child's risk of becoming wasted or stunted, and are more informative about a child's growth than the widely used weight-for-age index (underweight). Although the introduction of length measurements in GMP is recommended by the World Health Organization, concerns about the reliability of length measurements collected in rural outreach settings have been expressed by stakeholders. Our aim was to describe the reliability and challenges associated with community health personnel measuring length for rural outreach GMP activities. Two reliability studies (A and B), using 10 children less than 24 months each, were conducted in the GMP services of a rural district in Ghana. Fifteen nurses and 15 health volunteers (HV) with no prior experience in length measurements were trained. Intra- and inter-observer technical error of measurement (TEM), average bias from expert anthropometrist, and coefficient of reliability (R) of length measurements were assessed and compared across sessions. Observations and interviews were used to understand the ability and experiences of health personnel with measuring length at outreach GMP. Inter-observer TEM was larger than intra-observer TEM for both nurses and HV at both sessions and was unacceptably (compared to error standards) high in both groups at both time points. Average biases from expert's measurements were within acceptable limits, however, both groups tended to underestimate length measurements. The R for lengths collected by nurses (92.3%) was higher at session B compared to that of HV (87.5%). Length measurements taken by nurses and HV, and those taken by an experienced anthropometrist at GMP sessions were of moderate agreement (kappa = 0.53, p reliability of length measurements improved after two refresher trainings for nurses but

  8. 75 FR 51025 - Application to Export Electric Energy; Vitol Inc.

    Science.gov (United States)

    2010-08-18

    ... adversely impact on the reliability of the U.S. electric power supply system. Copies of this application... DEPARTMENT OF ENERGY [OE Docket No. EA-370] Application to Export Electric Energy; Vitol Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application...

  9. Safety analyses of the electrical systems on VVER NPP

    International Nuclear Information System (INIS)

    Andel, J.

    2004-01-01

    Energoprojekt Praha has been the main entity responsible for the section on 'Electrical Systems' in the safety reports of the Temelin, Dukovany and Mochovce nuclear power plants. The section comprises 2 main chapters, viz. Offsite Power System (issues of electrical energy production in main generators and the link to the offsite transmission grid) and Onsite Power Systems (AC and DC auxiliary system, both normal and safety related). In the chapter on the off-site system, attention is paid to the analysis of transmission capacity of the 400 kV lines, analysis of transient stability, multiple fault analyses, and probabilistic analyses of the grid and NPP power system reliability. In the chapter on the on-site system, attention is paid to the power balances of the electrical sources and switchboards set for various operational and accident modes, checks of loading and function of service and backup sources, short circuit current calculations, analyses of electrical protections, and analyses of the function and sizing of emergency sources (DG sets and UPS systems). (P.A.)

  10. Job safety and awareness analysis of safety implementation among electrical workers in airport service company

    Directory of Open Access Journals (Sweden)

    Putra Perdana Suteja

    2018-01-01

    Full Text Available Electrical is a fundamental process in the company that has high risk and responsibility especially in public service company such as an airport. Hence, the company that operates activities in the airport has to identify and control the safety activities of workers. On the safety implementation, the lack of workers’ awareness is fundamental aspects to the safety failure. Therefore, this study aimed to analyse the safety awareness and identify risk in the electrical workplace. Safety awareness questionnaires are distributed to ten workers in order to analyse their awareness. Job safety analysis method used to identify the risk in the electrical workplace. The preliminary study stated that workers were not aware of personal protective equipment usage so that the awareness and behavioural need to be analysed. The result is the hazard was found such as electrical shock and noise for various intensity in the workplace. While electrical workers were aware of safety implementation but less of safety behaviour. Furthermore, the recommendation can be implemented are the implementation of behaviour-based safety (BBS, 5S implementation and accident report list.

  11. Reliability and safety engineering

    CERN Document Server

    Verma, Ajit Kumar; Karanki, Durga Rao

    2016-01-01

    Reliability and safety are core issues that must be addressed throughout the life cycle of engineering systems. Reliability and Safety Engineering presents an overview of the basic concepts, together with simple and practical illustrations. The authors present reliability terminology in various engineering fields, viz.,electronics engineering, software engineering, mechanical engineering, structural engineering and power systems engineering. The book describes the latest applications in the area of probabilistic safety assessment, such as technical specification optimization, risk monitoring and risk informed in-service inspection. Reliability and safety studies must, inevitably, deal with uncertainty, so the book includes uncertainty propagation methods: Monte Carlo simulation, fuzzy arithmetic, Dempster-Shafer theory and probability bounds. Reliability and Safety Engineering also highlights advances in system reliability and safety assessment including dynamic system modeling and uncertainty management. Cas...

  12. 76 FR 58716 - Interpretation of Transmission Planning Reliability Standard

    Science.gov (United States)

    2011-09-22

    ..., Western Public Agencies Group, Western Montana Electric G&T Cooperative, Inc., Oregon Municipal Electric... Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g... FERC ] 61,062, order on reh'g & compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa, Inc. v...

  13. Approach for an integral power transformer reliability model

    NARCIS (Netherlands)

    Schijndel, van A.; Wouters, P.A.A.F.; Steennis, E.F.; Wetzer, J.M.

    2012-01-01

    In electrical power transmission and distribution networks power transformers represent a crucial group of assets both in terms of reliability and investments. In order to safeguard the required quality at acceptable costs, decisions must be based on a reliable forecast of future behaviour. The aim

  14. A sequential Monte Carlo model of the combined GB gas and electricity network

    International Nuclear Information System (INIS)

    Chaudry, Modassar; Wu, Jianzhong; Jenkins, Nick

    2013-01-01

    A Monte Carlo model of the combined GB gas and electricity network was developed to determine the reliability of the energy infrastructure. The model integrates the gas and electricity network into a single sequential Monte Carlo simulation. The model minimises the combined costs of the gas and electricity network, these include gas supplies, gas storage operation and electricity generation. The Monte Carlo model calculates reliability indices such as loss of load probability and expected energy unserved for the combined gas and electricity network. The intention of this tool is to facilitate reliability analysis of integrated energy systems. Applications of this tool are demonstrated through a case study that quantifies the impact on the reliability of the GB gas and electricity network given uncertainties such as wind variability, gas supply availability and outages to energy infrastructure assets. Analysis is performed over a typical midwinter week on a hypothesised GB gas and electricity network in 2020 that meets European renewable energy targets. The efficacy of doubling GB gas storage capacity on the reliability of the energy system is assessed. The results highlight the value of greater gas storage facilities in enhancing the reliability of the GB energy system given various energy uncertainties. -- Highlights: •A Monte Carlo model of the combined GB gas and electricity network was developed. •Reliability indices are calculated for the combined GB gas and electricity system. •The efficacy of doubling GB gas storage capacity on reliability of the energy system is assessed. •Integrated reliability indices could be used to assess the impact of investment in energy assets

  15. Critical Assessment of the Foundations of Power Transmission and Distribution Reliability Metrics and Standards.

    Science.gov (United States)

    Nateghi, Roshanak; Guikema, Seth D; Wu, Yue Grace; Bruss, C Bayan

    2016-01-01

    The U.S. federal government regulates the reliability of bulk power systems, while the reliability of power distribution systems is regulated at a state level. In this article, we review the history of regulating electric service reliability and study the existing reliability metrics, indices, and standards for power transmission and distribution networks. We assess the foundations of the reliability standards and metrics, discuss how they are applied to outages caused by large exogenous disturbances such as natural disasters, and investigate whether the standards adequately internalize the impacts of these events. Our reflections shed light on how existing standards conceptualize reliability, question the basis for treating large-scale hazard-induced outages differently from normal daily outages, and discuss whether this conceptualization maps well onto customer expectations. We show that the risk indices for transmission systems used in regulating power system reliability do not adequately capture the risks that transmission systems are prone to, particularly when it comes to low-probability high-impact events. We also point out several shortcomings associated with the way in which regulators require utilities to calculate and report distribution system reliability indices. We offer several recommendations for improving the conceptualization of reliability metrics and standards. We conclude that while the approaches taken in reliability standards have made considerable advances in enhancing the reliability of power systems and may be logical from a utility perspective during normal operation, existing standards do not provide a sufficient incentive structure for the utilities to adequately ensure high levels of reliability for end-users, particularly during large-scale events. © 2015 Society for Risk Analysis.

  16. Innovations in power systems reliability

    CERN Document Server

    Santora, Albert H; Vaccaro, Alfredo

    2011-01-01

    Electrical grids are among the world's most reliable systems, yet they still face a host of issues, from aging infrastructure to questions of resource distribution. Here is a comprehensive and systematic approach to tackling these contemporary challenges.

  17. Quality of service regulation, q follows x

    International Nuclear Information System (INIS)

    Meijer, A.Th.

    2005-01-01

    Both the Electricity Act and Gas Act have been recently amended. One of many changes made, was the addition of a system of 'quality of service regulation' to the existing system of price cap regulation. In this article the author explores the system of quality of service regulation in the Electricity Act. Quality of service regulation aims to counterbalance the possible adverse effects of price cap regulation.The Dutch transmission and distribution systems have always been very reliable, especially compared to those in other countries. Nevertheless, the average duration of interruptions to supply per year has risen slightly in recent years. In order to ensure that price reductions will not lead to a further decrease in the quality of service the Dutch legislator has decided to incorporate the aspect of reliability into the existing system of price cap regulation. Both the Electricity Act and Gas Act provide for a system of yardstick competition, whereby good quality of service is financially rewarded and poor quality of service will lead to additional price reductions.This was achieved by incorporating a quality parameter (an extra variable) in the existing price cap formula. Also, all Distribution Network Operators (DNOs) are required to adopt a quality management system. Every other year DNOs must draw up a 'quality and capacity document' which they must publicise. In this document DNOs wilt have to demonstrate that their quality management systems are adequate. Various aspects of the system of quality of service regulation are detailed in Iower legislation by the Minister of Economic Affairs and in several decisions by the Director of DTe. In a decision of 8 October 2005 the Director of DTe adopted the method by which the quality parameter (or 'q factor') with respect to the second price control period (2004-2006) is to be determined.This decision is also referred to as the 'methode-besluit'. Distribution Network Operators (DNOs) can be penalised or rewarded by

  18. Performance issues for a changing electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    Extremely cold weather created record demands for electricity in the eastern two-thirds of the United States during the week of January 16, 1994. Fuel-related problems, mostly the result of transportation constraints resulting from ice accumulation on roads and water-ways, and unexpected generating capacity outages at utilities and nonutilities resulted in demand not being met. Some utilities asked nonessential customers along with State governments and a portion of the Federal Government to shut down. Two electric control areas, the Pennsylvania-New Jersey-Maryland Interconnection (PJM) and Virginia Electric & Power Company (VEPCO), instituted rolling blackouts. This disturbance was reported widely in the press and, along with other disturbances, peaked renewed interest in the reliability of the electric power system. The renewed interest in reliability has coincided with substantial changes that are beginning to occur in the structure and competitiveness of the electric power industry. Juxtaposing the question of reliability and the issue of changing industry structure leads to the central concern of this report: What effect, if any, will the changing structure of the industry have on the reliability of the system?

  19. Engineering IT-enabled sustainable electricity services the tale of two low-cost green Azores Islands

    CERN Document Server

    Xie, Le; Liu, Qixing

    2013-01-01

    Engineering IT-Enabled Electricity Services: The Tale of Two Low-Cost Green Azores Islands covers sustainable energy services to customers - a balanced choice and coordination of energy generated by traditional and alternative sources. The “Green Islands” project represents a decade of work by over a dozen researchers who have developed a model designed to utilize the potential of distributed clean resources. The key is the proper use of Information Technology (IT).  Sited on two islands in the Azores, the project developed the model of careful forecasting of demand and supply, down to the minute, coordinating the output of conventional power plants, wind energy, fly wheels, hydroelectricity, demand reduction, and even plug-in electric vehicles to take full advantage of the clean resources available. This contributed volume presents methods for predicting variable resources, such as wind power generation, and analyzes the achievable accuracy of these predictions. Throughout this book, contributors sho...

  20. Characteristics of the prices of operating reserves and regulation services in competitive electricity markets

    International Nuclear Information System (INIS)

    Wang Peng; Zareipour, Hamidreza; Rosehart, William D.

    2011-01-01

    In this paper, characteristics of the prices of reserves and regulation services in the Ontario, New York and ERCOT electricity markets are studied. More specifically, price variability, price jumps, long-range correlation, and non-linearity of the prices are analyzed using the available measures in the literature. For the Ontario electricity market, the prices of 10-min spinning, 10-min non-spinning, and 30-min operating reserves for the period May 1, 2002 to December 31, 2007 are analyzed. For the New York market, prices of the same reserves plus regulation service are studied for the period February 5, 2005 to December 31, 2008. For the ERCOT market, we analyze the prices of responsive reserve, regulation up and regulation down services, for the period January 1, 2005 to December 31, 2009. The studied characteristics of operating reserve and regulation prices are also compared with those of energy prices. The findings of this paper show that the studied reserve and regulation prices feature extreme volatility, more frequent jumps and spikes, different peak price occurrence time, and lower predictability, compared to the energy prices. - Research highlights: → We examine various statistical characteristics of reserve and regulation prices. → We compare characteristics of reserve and regulation and energy prices. → Reserve and regulation prices feature different patterns from energy prices. → Reserve and regulation prices are more dispersive and volatile than energy price.