WorldWideScience

Sample records for rehoboth massachusetts installation

  1. NOAA Office for Coastal Management RoxAnn Acoustic Sensor Benthic Habitat Data, Rehoboth Bay, Delaware, 2000 (NODC Accession 0089461)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — During the spring of 1999, the Delaware Coastal Programs (DCP) identified the spatial extent of macroalgae in the shallow portions of Rehoboth Bay utilizing...

  2. RoxAnn Acoustic Sensor Data Points - Rehoboth Bay, Delaware Algae Mapping with Single Beam Acoustics: June 12 - 16, 2000

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — During the spring of 1999, the Delaware Coastal Programs(DCP) identified the spatial extent of macroalgae in the shallow portions of Rehoboth Bay utilizing...

  3. Intra- and inter-annual trends in phosphorus loads and comparison with nitrogen loads to Rehoboth Bay, Delaware (USA)

    Science.gov (United States)

    Volk, J.A.; Scudlark, J.R.; Savidge, K.B.; Andres, A.S.; Stenger, R.J.; Ullman, W.J.

    2012-01-01

    Monthly phosphorus loads from uplands, atmospheric deposition, and wastewater to Rehoboth Bay (Delaware) were determined from October 1998 to April 2002 to evaluate the relative importance of these three sources of P to the Bay. Loads from a representative subwatershed were determined and used in an areal extrapolation to estimate the upland load from the entire watershed. Soluble reactive phosphorus (SRP) and dissolved organic P (DOP) are the predominant forms of P in baseflow and P loads from the watershed are highest during the summer months. Particulate phosphorus (PP) becomes more significant in stormflow and during periods with more frequent or larger storms. Atmospheric deposition of P is only a minor source of P to Rehoboth Bay. During the period of 1998-2002, wastewater was the dominant external source of P to Rehoboth Bay, often exceeding all other P sources combined. Since 2002, however, due to technical improvements to the sole wastewater plant discharging directly to the Bay, the wastewater contribution of P has been significantly reduced and upland waters are now the principal source of P on an annualized basis. Based on comparison of N and P loads, primary productivity and biomass carrying capacity in Rehoboth Bay should be limited by P availability. However, due to the contrasting spatial and temporal patterns of N and P loading and perhaps internal cycling within the ecosystem, spatial and temporal variations in N and P-limitation within Rehoboth Bay are likely. ?? 2011 Elsevier Ltd.

  4. Tracks: EPHT Massachusetts Case Study

    Centers for Disease Control (CDC) Podcasts

    This podcast highlights the Massachusetts Environmental Public Health Tracking Network and features commentary from Massachusetts Department of Public Health Associate Health Commissioner Suzanne Condon.

  5. Geothermal Mill Redevelopment Project in Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Vale, A.Q.

    2009-03-17

    Anwelt Heritage Apartments, LLC redeveloped a 120-year old mill complex into a mixed-use development in a lower-income neighborhood in Fitchburg, Massachusetts. Construction included 84 residential apartments rented as affordable housing to persons aged 62 and older. The Department of Energy (“DOE”) award was used as an essential component of financing the project to include the design and installation of a 200 ton geothermal system for space heating and cooling.

  6. Tracks: EPHT Massachusetts Case Study

    Centers for Disease Control (CDC) Podcasts

    2009-07-20

    This podcast highlights the Massachusetts Environmental Public Health Tracking Network and features commentary from Massachusetts Department of Public Health Associate Health Commissioner Suzanne Condon.  Created: 7/20/2009 by Centers for Disease Control and Prevention (CDC).   Date Released: 7/20/2009.

  7. Case study: Massachusetts Department of Public Health's Southeastern Massachusetts health study on leukemia around Pilgrim Nuclear Power Station: Who won?

    Energy Technology Data Exchange (ETDEWEB)

    Flanagan, Anita [Boston Edison Company (United States)

    1993-07-01

    In October 1990, the Massachusetts Department of Public Health released their Southeastern Massachusetts health study. This is a study of leukemia incidence in 22 towns around Pilgrim NPP, for the period 1978 through 1986. Pilgrim Station had been returned to operation following a 3 year outage, from 1986-1989. During this period, some $300 million in capital outlay was invested by Boston Edison in upgrading safety systems and installing the so-Called Three Mile Island upgrades. A copy of the peer review panel report is attached to this paper. Because of the interest in the Southeastern Massachusetts Health Study in Europe. There are three major points the Panel made which can summarized: 1. No excess of leukemia was found around Pilgrim Station. 2. The Southeastern Massachusetts Health Study over-predicted by a factor of 90 the number of leukemia cases attributable to plant operation. 3. The Southeastern Massachusetts Health Study failed to account for exposure to natural background radiation, which represents far larger biological exposure than plant Operation. Given All Of This, One Might Ask Why Didn't Common Sense Prevail In The Beginning? One Answer Might Be The Energy Of The Media In Pursuing The Story And Playing It Up No Matter What. Another Answer Might Be That The Original Study Purported To Show 'What Everyone Knows'. No One Really Stopped To Question Whether The Study Was Politically Motivated, Given That The Division of Environmental Health's Budget Had Been Cut.

  8. Case study: Massachusetts Department of Public Health's Southeastern Massachusetts health study on leukemia around Pilgrim Nuclear Power Station: Who won?

    International Nuclear Information System (INIS)

    Flanagan, Anita

    1993-01-01

    In October 1990, the Massachusetts Department of Public Health released their Southeastern Massachusetts health study. This is a study of leukemia incidence in 22 towns around Pilgrim NPP, for the period 1978 through 1986. Pilgrim Station had been returned to operation following a 3 year outage, from 1986-1989. During this period, some $300 million in capital outlay was invested by Boston Edison in upgrading safety systems and installing the so-Called Three Mile Island upgrades. A copy of the peer review panel report is attached to this paper. Because of the interest in the Southeastern Massachusetts Health Study in Europe. There are three major points the Panel made which can summarized: 1. No excess of leukemia was found around Pilgrim Station. 2. The Southeastern Massachusetts Health Study over-predicted by a factor of 90 the number of leukemia cases attributable to plant operation. 3. The Southeastern Massachusetts Health Study failed to account for exposure to natural background radiation, which represents far larger biological exposure than plant Operation. Given All Of This, One Might Ask Why Didn't Common Sense Prevail In The Beginning? One Answer Might Be The Energy Of The Media In Pursuing The Story And Playing It Up No Matter What. Another Answer Might Be That The Original Study Purported To Show 'What Everyone Knows'. No One Really Stopped To Question Whether The Study Was Politically Motivated, Given That The Division of Environmental Health's Budget Had Been Cut

  9. Massachusetts Recreational Fishing Demand Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Stated preference choice experiment data were collected in 2012 from Massachuestts saltwater recreational fishermen. Saltwater anglers fishing in Massachusetts (MA)...

  10. Contaminant transport in Massachusetts Bay

    Science.gov (United States)

    Butman, Bradford

    Construction of a new treatment plant and outfall to clean up Boston Harbor is currently one of the world's largest public works projects, costing about $4 billion. There is concern about the long-term impact of contaminants on Massachusetts Bay and adjacent Gulf of Maine because these areas are used extensively for transportation, recreation, fishing, and tourism, as well as waste disposal. Public concern also focuses on Stellwagen Bank, located on the eastern side of Massachusetts Bay, which is an important habitat for endangered whales. Contaminants reach Massachusetts Bay not only from Boston Harbor, but from other coastal communities on the Gulf of Maine, as well as from the atmosphere. Knowledge of the pathways, mechanisms, and rates at which pollutants are transported throughout these coastal environments is needed to address a wide range of management questions.

  11. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  12. Residential Energy Efficiency Potential: Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-11-21

    Energy used by Massachusetts single-family homes that can be saved through cost-effective improvements. Prepared by Eric Wilson and Noel Merket, NREL, and Erin Boyd, U.S. Department of Energy Office of Energy Policy and Systems Analysis.

  13. E-Learning in Massachusetts

    Science.gov (United States)

    Graziano, April

    2005-01-01

    This document presents some of the many ways schools are using online technologies. The report illustrates how Massachusetts educators are taking advantage of e-learning opportunities to improve student learning. Educators across the state are using online courses and resources, engaging in online events and projects, and showing interest in…

  14. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  15. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  16. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  17. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  18. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  19. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  20. Massachusetts Institute of Technology / Andres Sevtshuk

    Index Scriptorium Estoniae

    Sevtshuk, Andres, 1981-

    2006-01-01

    A. Sevtshuk oma magistritööst "The Self-aware City / Enesest teadlik linn". Juhendaja William J. Mitchell. Koolist Massachusetts Institute of Technology, selle arhitektuuriosakonnast, arhitektuuri teadusmagistrantuurist

  1. 2015 USACE NAE Topobathy Lidar DEM: Massachusetts

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These data were collected for the USACE New England District (NAE). The data set is made up of 21 small projects in Massachusetts. These projects are: Andrews River,...

  2. Pieceable Kingdom: Interior Architecture: University of Massachusetts

    Science.gov (United States)

    Ryder, Sharon Lee

    1975-01-01

    Because of a high vacancy rate and widespread vandalism in its highrise dormitories, the University of Massachusetts commissioned an environmental consultant to assess the problem. A two-year study showed that occupancy increased and vandalism decreased in an experimental dormitory where students were allowed greater freedom to arrange their own…

  3. An Analysis of the Massachusetts Healthcare Law.

    Science.gov (United States)

    Stephens, James H; Ledlow, Gerald R; Sach, Michael V; Reagan, Julie K

    2017-01-01

    Healthcare in the United States has been one topic of the debates and discussion in the country for many years. The challenge for affordable, accessible, and quality healthcare for most Americans has been on the agenda of federal and state legislatures. There is probably no other state that has drawn as much individual attention regarding this challenge as the state of Massachusetts. While researching the topic for this article, it was discovered that financial and political perspectives on the success or failure of the healthcare model in Massachusetts vary depending on the aspect of the system being discussed. In this article the authors give a brief history and description of the Massachusetts Healthcare Law, explanation of how the law is financed, identification of the targeted populations in Massachusetts for which the law provides coverage, demonstration of the actual benefit coverage provided by the law, and review of the impact of the law on healthcare providers such as physicians and hospitals. In addition, there are explanations about the impact of the law on health insurance companies, discussion of changes in healthcare premiums, explanation of costs to the state for the new program, reviews of the impact on the health of the insured, and finally, projections on the changes that healthcare facilities will need to make to maintain fiscal viability as a result of this program.

  4. Alcohol Dispenser Training in Amherst Massachusetts

    Science.gov (United States)

    Riccelli, Carlene

    1986-01-01

    Reviews efforts of the Alcohol Dispenser Training program in Amherst, Massachusetts over a five-year period. Evaluations indicate that participants agree that training is worthwhile, that they are more aware of the effects of alcohol on their patrons, and that they have better knowledge of appropriate strategies for preventing intoxication of…

  5. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  6. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  7. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  8. Master environmental plan for Fort Devens, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  9. Madaket Harbor, Nantucket, Massachusetts. Water Resources Improvement.

    Science.gov (United States)

    1977-07-01

    will continue to be, important increases in the recreational use of land and water. The harbor area is an important arena for commercial shellfishing...an important arena for commercial shell fishing. The past few years have seen a rather rapid increase in residential land use. Construction has...beamc. Tnis material will be re-deposited,, viaj troio it 1-apfro1inr ox prior location. j, MADAKET HARBOR NANTUCKET, MASSACHUSETTS FEASIBILITY

  10. Lower electricity prices and greenhouse gas emissions due to rooftop solar: empirical results for Massachusetts

    International Nuclear Information System (INIS)

    Kaufmann, Robert K.; Vaid, Devina

    2016-01-01

    Monthly and hourly correlations among photovoltaic (PV) capacity utilization, electricity prices, electricity consumption, and the thermal efficiency of power plants in Massachusetts reduce electricity prices and carbon emissions beyond average calculations. PV utilization rates are highest when the thermal efficiencies of natural gas fired power plants are lowest, which reduces emissions of CO 2 and CH 4 by 0.3% relative to the annual average emission rate. There is a positive correlation between PV utilization rates and electricity prices, which raises the implied price of PV electricity by up to 10% relative to the annual average price, such that the average MWh reduces electricity prices by $0.26–$1.86 per MWh. These price reductions save Massachusetts rate-payers $184 million between 2010 and 2012. The current and net present values of these savings are greater than the cost of solar renewable energy credits which is the policy instrument that is used to accelerate the installation of PV capacity. Together, these results suggest that rooftop PV is an economically viable source of power in Massachusetts even though it has not reached socket parity. - Highlights: •Implied price of PV up to 10% greater than the annual average price. •PV saves Massachusetts rate-payers $184 million in 2010–2012. •Annual savings are greater than the cost of solar renewable energy credits. •Savings rise longer lifetime of PV systems and pay period for SREC's shortened. •PV reduces emissions of CO 2 and CH 4 by 0.3% relative to the annual average.

  11. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  12. 78 FR 59962 - Notice of Inventory Completion: University of Massachusetts Amherst, Department of Anthropology...

    Science.gov (United States)

    2013-09-30

    ....R50000] Notice of Inventory Completion: University of Massachusetts Amherst, Department of Anthropology... Massachusetts Amherst, Department of Anthropology, has completed an inventory of human remains and associated... request to the University of Massachusetts Amherst, Department of Anthropology. If no additional...

  13. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  14. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  15. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  16. Energy self-sufficiency in Northampton, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    1979-10-01

    The study is not an engineering analysis but begins the process of exploring the potential for conservation and local renewable-resource development in a specific community, Northampton, Massachusetts, with the social, institutional, and environmental factors in that community taken into account. Section I is an extensive executive summary of the full study, and Section II is a detailed examination of the potential for increased local energy self-sufficiency in Northampton, including current and future demand estimates, the possible role of conservation and renewable resources, and a discussion of the economic and social implications of alternative energy systems. (MOW)

  17. Massachusetts reservoir simulation tool—User’s manual

    Science.gov (United States)

    Levin, Sara B.

    2016-10-06

    IntroductionThe U.S. Geological Survey developed the Massachusetts Reservoir Simulation Tool to examine the effects of reservoirs on natural streamflows in Massachusetts by simulating the daily water balance of reservoirs. The simulation tool was developed to assist environmental managers to better manage water withdrawals in reservoirs and to preserve downstream aquatic habitats.

  18. Leveraging Research to Improve Massachusetts's Schools

    Science.gov (United States)

    Champagne, Erica; Therriault, Susan Bowles

    2018-01-01

    The Massachusetts Department of Elementary and Secondary Education (ESE) and the Massachusetts Board of Elementary and Secondary Education are deeply committed to ensuring that every student in the state has access to a high-quality education, and they have combined this commitment with an openness to innovation. After just one year of School…

  19. 78 FR 5476 - Massachusetts; Major Disaster and Related Determinations

    Science.gov (United States)

    2013-01-25

    ... Massachusetts resulting from Hurricane Sandy during the period of October 27 to November 8, 2012, is of... Commonwealth of Massachusetts have been designated as adversely affected by this major disaster: Barnstable... Unemployment Assistance (DUA); 97.046, Fire Management Assistance Grant; 97.048, Disaster Housing Assistance to...

  20. Installation Restoration Program Phase 1: Records Search of Hanscom Air Force Base, Massachusetts

    Science.gov (United States)

    1984-08-01

    section 3.1. 7. RESOLUTION OF INTERAGENCY CONFLICTS Any conflict arising under this agreement will be resolved at successive levels of Agency...its program recipients with the social , regulatory, and physical impacts of improper hazardous waste management. For private and municipal clients...surface mining operations. These reports detailed all enviromental aspects of the mining operation from exploration to reclamation. He also assisted

  1. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  2. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  3. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  4. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  5. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  6. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  7. Pipeline corridors through wetlands -- Impacts on plant communities: Norris Brook Crossing Peabody, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted August 17--19, 1992, at the Norris Brook crossing in the town of Peabody, Essex County, Massachusetts. The pipeline at this site was installed during September and October 1990. A backhoe was used to install the pipeline. The pipe was assembled on the adjacent upland and slid into the trench, after which the backhoe was used again to fill the trench and cover the pipeline. Within two years after pipeline construction, a dense vegetative community, composed predominantly of native perennial species, had become established on the ROW. Compared with adjacent natural areas undisturbed by pipeline installation, there was an increase in purple loosestrife and cattail within the ROW, while large woody species were excluded from the ROW. As a result of the ROW`s presence, habitat diversity, edge-type habitat, and species diversity increased within the site. Crooked-stem aster, Aster prenanthoides (a species on the Massasschusetts list of plants of special concern), occurred in low numbers in the adjacent natural areas and had reinvaded the ROW in low numbers.

  8. Planned Parenthood League of Massachusetts v. Bellotti.

    Science.gov (United States)

    1989-02-07

    The Planned Parenthood League of Massachusetts instituted a class action suit challenging the constitutionality of a statute requiring minors seeking an abortion to obtain parental consent or to persuade a judge of their maturity to give informed consent or that abortion would be in their best interest. In order to invoke judicial review, the plaintiffs moved their suit to federal court. The District Court dismissed the case on grounds that federal review power would interfere with state administration. On appeal, the First Circuit Court of Appeals decided that the plaintiffs could proceed with their action. The Circuit Court found that federal adjudication would not unduly interfere with state administration and remanded the case for further proceedings. Although it affirmed the statute's validity, the circuit court ruled that the plaintiffs must be allowed the opportunity to demonstrate the statute's unconstitutionality.

  9. Massachusetts Signing Bonus Program for New Teachers

    Directory of Open Access Journals (Sweden)

    R. Clarke Fowler

    2003-04-01

    Full Text Available This article examines the Massachusetts Signing Bonus Program for New Teachers, a nationally prominent program that has recruited and prepared $20,000 bonus recipients to teach after seven weeks' training at the Massachusetts Institute for New Teachers (MINT. Although state officials have trumpeted this initiative as a national model that other states are copying, they announced in November 2002 that they were radically changing it. The changes included halting the state's national recruitment efforts and replacing the seven-week, fast-track training program designed by the New Teacher Project with year-long programs to be designed by three of the state's education schools. Even though the state spent more than $50,000 recruiting individuals from states outside the Northeast over the first four program years, it garnered just seven bonus recipients from the non-Northeast states its recruiters visited, only four of whom were still teaching in Fall 2002. The state did, however, generate a substantial number of applicants in each program year (ranging from 783 to nearly 950, most of whom came from Massachusetts or nearby states. Contrary to state officials' claims, though, it appears that many of these individuals had substantial prior educational experience. Although officials stated that all bonus teachers would go to 13 designated high-need urban districts, the state has never met this commitment, sending fewer bonus teachers to these districts in each of the first three years of the program. The state has lost a high percentage of its bonus teachers to attrition particularly in state-designated, high-need districts. These attrition rates are substantially higher than comparable national rates. Although the state has portrayed the Bonus and MINT programs, combined, as highly successful, officials exaggerated many of the purported positive outcomes. On the positive side, independent survey data (Churchill et al., 2002 indicated that principals

  10. Emergence of community doubts at Plymouth, Massachusetts

    International Nuclear Information System (INIS)

    Davis, S.H.

    1982-01-01

    The accident at Three Mile Island affected the attitudes not only of residents in the immediate vicinity of Middletown, Pennsylvania, but also of citizens in other communities that hosted nuclear plants. This chapter describes the evolution of public attitudes toward nuclear power in the town of Plymouth, Massachusetts, from the time plans for the construction of the Pilgrim-1 plant were announced in 1967 until after the accident at Three Mile Island in March 1979. The ideas developed here arose from three summers of anthropological fieldwork in Plymouth. This study includes a review of the social science literature on nuclear-power plant sitings, interviews with town officials and utility-company representatives, a content analysis of articles in the local newspaper, collection of demographic and other social statistics, attendance at public hearings and town meetings, and interviews with Plymouth citizens

  11. US Hydropower Resource Assessment for Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.

    1995-07-01

    The Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the Commonwealth of Massachusetts.

  12. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  13. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  14. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  15. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  16. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  17. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  18. Book Review: Review Manual for Massachusetts General Hospital ...

    African Journals Online (AJOL)

    Abstract. Book Title: Review Manual for Massachusetts General Hospital Handbook of. General Hospital Psychiatry. 5th ed. Book Author: Theodore A. Stern. Pp 121. Philadelphia: Elsevier Mosby. 2004. ISBN 0-323-02768-7.

  19. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  20. Coastal Massachusetts Submerged Aquatic Beds 1994-1996 Geodatabase

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Change Analysis Program (C-CAP) at NOAA Office for Coastal Management partnered with The Massachusetts Department of Environmental Protection Wetlands...

  1. Coastal Massachusetts Submerged Aquatic Beds 1994-1996 Biotic

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Change Analysis Program (C-CAP) at NOAA Office for Coastal Management partnered with The Massachusetts Department of Environmental Protection Wetlands...

  2. Coastal Massachusetts Submerged Aquatic Beds 1994-1996 Substrate

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Change Analysis Program (C-CAP) at NOAA Office for Coastal Management partnered with The Massachusetts Department of Environmental Protection Wetlands...

  3. Coastal Massachusetts Submerged Aquatic Beds 1994-1996 Geoform

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Change Analysis Program (C-CAP) at NOAA Office for Coastal Management partnered with The Massachusetts Department of Environmental Protection Wetlands...

  4. A Context Note: Choice, Diversity and Desegregation in Massachusetts.

    Science.gov (United States)

    Zerchykov, Ross

    1986-01-01

    Presents and discusses enrollment statistics for nine Massachusetts school systems undergoing desegregation. Focuses on Boston, Worcester, Springfield, Lowell, and Cambridge. Describes each system as successfully promoting desegregation through magnet schools and parental choice. (KH)

  5. 2006 URS Corporation Bare Earth Topographic Lidar: Shawsheen River, Massachusetts

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — URS Corporation contracted EarthData International to aquire topographic elevation data for 82 square miles in Essex and Middlesex Counties, Massachusetts during...

  6. Nantucket, Massachusetts Tsunami Forecast Grids for MOST Model

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Nantucket, Massachusetts Forecast Model Grids provides bathymetric data strictly for tsunami inundation modeling with the Method of Splitting Tsunami (MOST)...

  7. Massachusetts Bay - Internal wave packets digitized from SAR imagery

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This feature class contains internal wave packets digitized from SAR imagery at 1:350,000 scale in Massachusetts Bay. Internal waves are nonsinusoidal waves that...

  8. Maine and Massachusetts 2015 QL1 and QL2 Lidar

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Geographic Extent: Central Maine, covering approximately 2,882 total square miles at QL 2. Western Massachusetts, covering approximately 815 total square miles at QL...

  9. The Cost of Employment Discrimination against Transgender Residents of Massachusetts

    OpenAIRE

    Herman, Jody L.

    2011-01-01

    Transgender residents of Massachusetts have reported experiencing discrimination in employment. Loss of employment due to anti-transgender bias often means lost wages, lost health insurance coverage, and housing instability. Therefore, employment discrimination might affect the budget of the Commonwealth of Massachusetts in several ways: reduced income tax revenues, higher public assistance expenditures, and other costs. For instance, if a worker is fired for being transgender and loses wages...

  10. The first decade of the Massachusetts Tobacco Control Program.

    OpenAIRE

    Koh, Howard K.; Judge, Christine M.; Robbins, Harriet; Celebucki, Carolyn Cobb; Walker, Deborah K.; Connolly, Gregory N.

    2005-01-01

    This article provides a comprehensive overview of the first decade of the Massachusetts Tobacco Control Program (MTCP). Born after Massachusetts passed a 1992 ballot initiative raising cigarette excise taxes to fund the program, MTCP greatly reduced statewide cigarette consumption before being reduced to a skeletal state by funding cuts. The article describes the program's components and goals, details outcomes, presents a summary of policy accomplishments, and reviews the present status of M...

  11. Storm tide monitoring during the blizzard of January 26-28, 2015, in eastern Massachusetts

    Science.gov (United States)

    Massey, Andrew J.; Verdi, Richard J.

    2015-01-01

    The U.S. Geological Survey (USGS) deployed a temporary monitoring network of six storm surge sensors and four barometric pressure sensors along the Atlantic coast in eastern Massachusetts, from Plymouth to Newburyport, before the blizzard of January 26–28, 2015 (Blizzard of January 2015), to record the timing and magnitude of storm tide at select locations where forecasters had predicted the potential for coastal flooding. Additionally, water-level data were recorded and transmitted in near real-time from four permanent USGS tidal stations—three on Cape Cod and one near the mouth of the Merrimack River in Newburyport. The storm surge sensors were deployed at previously established fixed sites outfitted with presurveyed mounting brackets. The mounting brackets were installed in 2014 as part of the USGS Surge, Wave, and Tide Hydrodynamic (SWaTH) Network (https://water.usgs.gov/floods/STN/), which was funded through congressional supplemental appropriations for the U.S. Department of the Interior after the devastating landfall of Hurricane Sandy on October 29, 2012 (Simmons and others, 2014). The USGS received this funding to enable better understanding of coastal flooding hazards in the region, to improve preparedness for future coastal storms, and to increase the resilience of coastal cities, infrastructure, and natural systems in the region (Buxton and others, 2013). The USGS established 163 monitoring locations along the New England coast for the SWaTH Network, including 70 sites in Massachusetts.

  12. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  13. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  14. Biomonitoring for metal contamination near two Superfund sites in Woburn, Massachusetts, using phytochelatins

    International Nuclear Information System (INIS)

    Gawel, James E.; Hemond, Harold F.

    2004-01-01

    Characterizing the spatial extent of groundwater metal contamination traditionally requires installing sampling wells, an expensive and time-consuming process in urban areas. Moreover, extrapolating biotic effects from metal concentrations alone is problematic, making ecological risk assessment difficult. Our study is the first to examine the use of phytochelatin measurements in tree leaves for delimiting biological metal stress in shallow, metal-contaminated groundwater systems. Three tree species (Rhamnus frangula, Acer platanoides, and Betula populifolia) growing above the shallow groundwater aquifer of the Aberjona River watershed in Woburn, Massachusetts, display a pattern of phytochelatin production consistent with known sources of metal contamination and groundwater flow direction near the Industri-Plex Superfund site. Results also suggest the existence of a second area of contaminated groundwater and elevated metal stress near the Wells G and H Superfund site downstream, in agreement with a recent EPA ecological risk assessment. Possible contamination pathways at this site are discussed

  15. [Book review] Massachusetts breeding bird atlas

    Science.gov (United States)

    Robbins, Chandler S.

    2005-01-01

    A glance at the dust jacket of this handsome volume drives home the conservation message that breeding bird atlases are designed to promote—that bird populations are changing over vast areas and, unless we become aware of changes in status and take remedial action, some species will disappear from our neighborhoods and even our county or state. A case in point involves the closely related Golden-winged Warbler (Vermivora chrysoptera) and Blue- winged Warbler (Vermivora pinus). The males are shown in the atlas with their breeding distribution maps. When I was an active birder in the Boston suburbs in the 1930s, the Golden-winged Warbler was a common breeder and it was a treat to find a Blue-winged Warbler. The atlas map 40 years later (1974–1979) shows only five confirmed records statewide for the Golden-winged Warbler, compared with 73 for the Blue-winged Warbler, and the Golden-winged Warbler is now listed as endangered by the Massachusetts Division of Fisheries and Wildlife. Nationally, it is a species of management concern.

  16. Massachusetts Large Blade Test Facility Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rahul Yarala; Rob Priore

    2011-09-02

    Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.

  17. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  18. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  19. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  20. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  1. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  2. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  3. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  4. Managing low-level radioactive waste in Massachusetts. Final report

    International Nuclear Information System (INIS)

    Bander, S.R.; Goldstein, M.E.

    1983-12-01

    As one of the country's largest generators of low-level radioactive waste, Massachusetts has begun independently seeking solutions to the questions surrounding low-level waste management issues. The Massachusetts Department of Public Health, Radiation Control Program, obtained funding from the U.S. Department ofEnergy through EG and G, Idaho, Inc. to develop a low-level waste management strategy for the Commonwealth. The Working Group was made up of individuals from various waste generating industries, environmental and public interest groups, medical and academic institutions, and affected state agencies. This final report document contains the following staff project reports: Proposed Low-Level Radioactive Waste Management Plan for The Commonwealth of Massachusetts, February 1983 and Low-Level Radioactive Waste Management in Massachusetts - Actions to be Considered for Implementation in 1984-1986, December 1983. These two staff reports represent the completion of the Massachusetts Low-Level Radioactive Waste Management Project. The first report provides some of the background material to the issues and some of the alternative courses of action which can be considered by state policy-makers. The second report provides the next phase in the process by delineating specific steps which may be taken before 1986 in order to address the low-level waste problem, and the estimated amount of time needed to complete each step

  5. Less Truth Than Error: Massachusetts Teacher Tests

    Directory of Open Access Journals (Sweden)

    Walt Haney

    1999-02-01

    Full Text Available Scores on the Massachusetts Teacher Tests of reading and writing are highly unreliable. The tests' margin of error is close to double to triple the range found on well-developed tests. A person retaking the MTT several times could have huge fluctuations in their scores even if their skill level did not change significantly. In fact, the 9 to 17 point margin of error calculated for the tests represents more than 10 percent of the grading scale (assumed to be 0 to 100. The large margin of error means there is both a high false-pass rate and a high false-failure rate. For example, a person who received a score of 72 on the writing test could have scored an 89 or a 55 simply because of the unreliability of the test. Since adults' reading and writing skills do not change a great deal over several months, this range of scores on the same test should not be possible. While this test is being touted as an accurate assessment of a person's fitness to be a teacher, one would expect the scores to accurately reflect a test-taker's verbal ability level. In addition to the large margin of error, the MTT contain questionable content that make them poor tools for measuring test-takers' reading and writing skills. The content and lack of correlation between the reading and writing scores reduces the meaningfulness, or validity, of the tests. The validity is affected not just by the content, but by a host of factors, such as the conditions under which tests were administered and how they were scored. Interviews with a small sample of test-takers confirmed published reports concerning problems with the content and administration.

  6. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  7. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Keller, W.

    1976-01-01

    A nuclear reactor installation includes a pressurized-water coolant reactor vessel and a concrete biological shield surrounding this vessel. The shield forms a space between it and the vessel large enough to permit rapid escape of the pressurized-water coolant therefrom in the event the vessel ruptures. Struts extend radially between the vessel and shield for a distance permitting normal radial thermal movement of the vessel, while containing the vessel in the event it ruptures, the struts being interspaced from each other to permit rapid escape of the pressurized-water coolant from the space between the shield and the vessel

  8. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  9. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  10. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  11. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  12. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  13. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  14. 76 FR 14067 - Notice of Inventory Completion: University of Massachusetts, Department of Anthropology, Amherst...

    Science.gov (United States)

    2011-03-15

    ...: University of Massachusetts, Department of Anthropology, Amherst, MA and Nantucket Historical Association... University of Massachusetts, Department of Anthropology, Amherst, MA, and the Nantucket Historical..., Department of Anthropology, professional staff in consultation with representatives of the Wampanoag...

  15. 75 FR 32177 - Energy Efficiency Program for Consumer Products: Commonwealth of Massachusetts Petition for...

    Science.gov (United States)

    2010-06-07

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy [Docket Number EERE-BT-PET-0024] Energy Efficiency Program for Consumer Products: Commonwealth of Massachusetts Petition for Exemption From Federal Preemption of Massachusetts' Energy Efficiency Standard for Residential Non...

  16. 76 FR 62396 - Martha Coakley, Attorney General of the Commonwealth of Massachusetts, Connecticut Public...

    Science.gov (United States)

    2011-10-07

    ..., Attorney General of the Commonwealth of Massachusetts, Connecticut Public Utilities Regulatory Authority... Martha Coakley, Attorney General of the Commonwealth of Massachusetts, Connecticut Public Utilities..., George Jepsen, Attorney General of the State of Connecticut, Connecticut Office of Consumer Counsel...

  17. Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Mendon, Vrushali V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhao, Mingjie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Taylor, Zachary T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Poehlman, Eric A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-15

    The 2015 IECC provides cost-effective savings for residential buildings in Massachusetts. Moving to the 2015 IECC from the 2012 IECC base code is cost-effective for residential buildings in all climate zones in Massachusetts.

  18. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  19. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  20. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  1. The first decade of the Massachusetts Tobacco Control Program.

    Science.gov (United States)

    Koh, Howard K; Judge, Christine M; Robbins, Harriet; Celebucki, Carolyn Cobb; Walker, Deborah K; Connolly, Gregory N

    2005-01-01

    This article provides a comprehensive overview of the first decade of the Massachusetts Tobacco Control Program (MTCP). Born after Massachusetts passed a 1992 ballot initiative raising cigarette excise taxes to fund the program, MTCP greatly reduced statewide cigarette consumption before being reduced to a skeletal state by funding cuts. The article describes the program's components and goals, details outcomes, presents a summary of policy accomplishments, and reviews the present status of MTCP in the current climate of national and state fiscal crises. The first decade of the MTCP offers many lessons learned for the future of tobacco control.

  2. System Dynamics Modeling of the Massachusetts SREC Market

    Directory of Open Access Journals (Sweden)

    Wilson Rickerson

    2010-08-01

    Full Text Available As states across the country struggle to increase local development of renewable energy, policymakers are turning to innovative program designs to meet their renewable electricity targets. Massachusetts recently adopted a unique, auction-based price support mechanism for the solar portion of its renewable portfolio standard. During the program development process, the Massachusetts Department of Energy Resources (DOER used system dynamics to simulate potential solar renewable energy certificate market conditions under the proposed regulations. The modeling exercise resulted in several program design changes that will lead to a more stable certificate market. System dynamics can be a useful tool for developing and improving sustainability programs.

  3. 77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts

    Science.gov (United States)

    2012-06-25

    ... Massachusetts Division Office, 55 Broadway, 10th Floor, Cambridge, MA 02142, 617-494-2419, [email protected]dot.gov . For Massachusetts Department of Transportation Highway Division (MassDOT): Michael Furlong, Project... Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION...

  4. National Program for Inspection of Non-Federal Dams. Upper Banjo Pond Dam (MA 00185) Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report.

    Science.gov (United States)

    1979-09-01

    Massachusetts. In addition, a copy of the report has also been furnished the owner, LePage Division of Papercraft Corporation, Gloucester, Massachusetts...of the dam. Factory buildings and a parking lot, all associated with the LePage Division of Papercraft Corpora- tion, are situated on the east side of...owned by the LePage Division of the Papercraft Corporation, Post Office Box 291, Gloucester, Massachusetts 01930. Mr. Arthur J. Douglas, Vice

  5. The Best of Intentions. Interior Architecture: Massachusetts General Hospital

    Science.gov (United States)

    Ryder, Sharon Lee

    1974-01-01

    The Massachusetts General Hospital/Surgical and Special Services study, an information processing system for redesigning an outmoded existing hospital, structured information into small-scale elements that could be analyzed, reassembled into different solutions, and the solution selected that best accommodates all of the complex requirements. (MF)

  6. An Analysis of the Charter School Facility Landscape in Massachusetts

    Science.gov (United States)

    National Alliance for Public Charter Schools, 2013

    2013-01-01

    In the spring of 2012, the Massachusetts Charter Public School Association, the Colorado League of Charter Schools, and the National Alliance for Public Charter Schools worked to collect data that would reveal and accurately portray the adequacy of charter school facilities and the average spending for facilities out of charter schools' operating…

  7. Family forest owner preferences for biomass harvesting in Massachusetts

    Science.gov (United States)

    Marla Markowski-Lindsay; Thomas Stevens; David B. Kittredge; Brett J. Butler; Paul Catanzaro; David Damery

    2012-01-01

    U.S. forests, including family-owned forests, are a potential source of biomass for renewable energy. Family forest owners constitute a significant portion of the overall forestland in the U.S., yet little is known about family forest owners' preferences for supplying wood-based biomass. The goal of this study is to understand how Massachusetts family forest...

  8. Identification of a nucleopolyhedrovirus in winter moth populations from Massachusetts

    Science.gov (United States)

    John P. Burand; Anna Welch; Woojin Kim; Vince D' Amico; Joseph S. Elkinton

    2011-01-01

    The winter moth, Operophtera brumata, originally from Europe, has recently invaded eastern Massachusetts. This insect has caused widespread defoliation of many deciduous tree species and severely damaged a variety of crop plants in the infested area including apple, strawberry, and especially blueberry.

  9. Digital Learning Compass: Distance Education State Almanac 2017. Massachusetts

    Science.gov (United States)

    Seaman, Julia E.; Seaman, Jeff

    2017-01-01

    This brief report uses data collected under the U.S. Department of Education's National Center for Educational Statistics (NCES) Integrated Postsecondary Education Data System (IPEDS) Fall Enrollment survey to highlight distance education data in the state of Massachusetts. The sample for this analysis is comprised of all active, degree-granting…

  10. Asian Pacific Americans in Cambridge. Community Profiles in Massachusetts.

    Science.gov (United States)

    Massachusetts Univ., Boston. Inst. for Asian American Studies.

    The Community Profiles Project uses data from the 1990 U.S. Census to describe some of the population characteristics of Asian Pacific Americans in selected Massachusetts cities and towns. The profiles include basic statistics relating to income, employment, education, and housing. This information can assist policy makers and practitioners in…

  11. Bat Rabies in Massachusetts, USA, 1985–2009

    OpenAIRE

    Wang, Xingtai; DeMaria, Alfred; Smole, Sandra; Brown, Catherine M.; Han, Linda

    2010-01-01

    To investigate rabies in Massachusetts, we analyzed bat rabies test results before and after introduction of raccoon variant rabies and after release of revised 1999 US Advisory Committee on Immunization Practices recommendations for rabies postexposure prophylaxis. Bat submissions were associated with level of rabies awareness and specific postexposure recommendations.

  12. Enrichment in Massachusetts Expanded Learning Time (ELT) Schools. Issue Brief

    Science.gov (United States)

    Caven, Meghan; Checkoway, Amy; Gamse, Beth; Luck, Rachel; Wu, Sally

    2012-01-01

    This brief highlights key information about enrichment activities, which represent one of the main components of the Massachusetts Expanded Learning Time (ELT) initiative. Over time, the ELT initiative has supported over two dozen schools across the Commonwealth. A comprehensive evaluation of the ELT initiative found that implementation of the…

  13. Gun Possession among Massachusetts Batterer Intervention Program Enrollees

    Science.gov (United States)

    Rothman, Emily F.; Johnson, Renee M.; Hemenway, David

    2006-01-01

    Batterers with access to firearms present a serious lethal threat to their partners. The purpose of this exploratory study is to estimate the prevalence of and risk markers for gun possession among Massachusetts men enrolled in batterer intervention programs. The authors found that 1.8% of the men reported having a gun in or around their home.…

  14. Massachusetts Study of Teacher Supply and Demand: Trends and Projections

    Science.gov (United States)

    Levin, Jesse; Berg-Jacobson, Alex; Atchison, Drew; Lee, Katelyn; Vontsolos, Emily

    2015-01-01

    In April 2015, the Massachusetts Department of Elementary and Secondary Education (ESE) commissioned American Institutes for Research (AIR) to develop a comprehensive set of 10-year projections of teacher supply and demand in order to inform planning for future workforce needs. This included state-level projections both in the aggregate, as well…

  15. 75 FR 51239 - University of Massachusetts Amherst, et al.

    Science.gov (United States)

    2010-08-19

    ... DEPARTMENT OF COMMERCE International Trade Administration University of Massachusetts Amherst, et al.; Notice of Consolidated Decision on Applications for Duty-Free Entry of Electron Microscopes This is a decision consolidated pursuant to Section 6(c) of the Educational, Scientific, and Cultural...

  16. Lead Policy and Academic Performance: Insights from Massachusetts

    Science.gov (United States)

    Reyes, Jessica Wolpaw

    2015-01-01

    In this article, Jessica Wolpaw Reyes investigates the link between lead exposure and student achievement in Massachusetts. Childhood exposure to even low levels of lead can adversely affect neurodevelopment, behavior, and cognitive performance. Using a panel dataset of cohorts of children born in the 1990s who were third and fourth graders in the…

  17. Access and use of information resources by Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    West, C.R. [Massachusetts Department of Environmental Protection, Boston (United States)

    1990-12-31

    This paper describes the way in which the Massachusetts Department of Environmental Protection uses risk assessment to implement the state`s environmental laws. It focuses on the Office of Research and Standards, which was created to provide information on adverse health effects of environmental contaminants, to recommend exposure levels, and to direct and manage research programs.

  18. 76 FR 61374 - Massachusetts; Emergency and Related Determinations

    Science.gov (United States)

    2011-10-04

    ... Hurricane Irene beginning on August 26, 2011, and continuing, are of sufficient severity and magnitude to... Commonwealth of Massachusetts have been designated as adversely affected by this declared emergency: Emergency... Unemployment Assistance (DUA); 97.046, Fire Management Assistance Grant; 97.048, Disaster Housing Assistance to...

  19. 75 FR 55810 - Massachusetts; Emergency and Related Determinations

    Science.gov (United States)

    2010-09-14

    ... Massachusetts resulting from Hurricane Earl beginning on September 1, 2010, and continuing, are of sufficient... affected by this declared emergency: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk... Unemployment Assistance (DUA); 97.046, Fire Management Assistance Grant; 97.048, Disaster Housing Assistance to...

  20. 77 FR 68796 - Massachusetts; Emergency and Related Determinations

    Science.gov (United States)

    2012-11-16

    ... from Hurricane Sandy beginning on October 27, 2012, and continuing, are of sufficient severity and... adversely affected by this declared emergency: All counties in the Commonwealth of Massachusetts for... Management Assistance Grant; 97.048, Disaster Housing Assistance to Individuals and Households In...

  1. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Jungmann, A.

    1976-01-01

    A nuclear reactor metal pressure vessel is surrounded by a concrete wall forming an annular space around the vessel. Thermal insulation is in this space and surrounds the vessel, and a coolant-conductive layer is also in this space surrounding the thermal insulation, coolant forced through this layer reducing the thermal stress on the concrete wall. The coolant-conductive layer is formed by concrete blocks laid together and having coolant passages, these blocks being small enough individually to permit them to be cast from concrete at the reactor installation, the thermal insulation being formed by much larger sheet-metal clad concrete segments. Mortar is injected between the interfaces of the coolant-conductive layer and concrete wall and the interfaces between the fluid-conductive layer and the insulation, a layer of slippery sheet material being interposed between the insulation and the mortar. When the pressure vessel is thermally expanded by reactor operation, the annular space between it and the concrete wall is completely filled by these components so that zero-excursion rupture safeguard is provided for the vessel. 4 claims, 1 figure

  2. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  3. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  4. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  5. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  6. CLIMATE CHANGE FUEL CELL PROGRAM UNITED STATES COAST GUARD AIR STATION CAPE COD BOURNE, MASSACHUSETTS

    Energy Technology Data Exchange (ETDEWEB)

    John K. Steckel Jr

    2004-06-30

    This report covers the first year of operation of a fuel cell power plant, installed by PPL Spectrum, Inc. (PPL) under contract with the United States Coast Guard (USCG), Research and Development Center (RDC). The fuel cell was installed at Air Station Cape Cod in Bourne, MA. The project had the support of the Massachusetts Technology Collaborative (MTC), the Department of Energy (DOE), and Keyspan Energy. PPL selected FuelCell Energy, Inc. (FCE) and its fuel cell model DFC{reg_sign}300 for the contract. Grant contributions were finalized and a contract between PPL and the USCG for the manufacture, installation, and first year's maintenance of the fuel cell was executed on September 24, 2001. As the prime contractor, PPL was responsible for all facets of the project. All the work was completed by PPL through various subcontracts, including the primary subcontract with FCE for the manufacture, delivery, and installation of the fuel cell. The manufacturing and design phases proceeded in a relatively timely manner for the first half of the project. However, during latter stages of manufacture and fuel cell testing, a variety of issues were encountered that ultimately resulted in several delivery delays, and a number of contract modifications. Final installation and field testing was completed in April and May 2003. Final acceptance of the fuel cell was completed on May 16, 2003. The fuel cell has operated successfully for more than one year. The unit achieved an availability rate of 96%, which exceeded expectations. The capacity factor was limited because the unit was set at 155 kW (versus a nameplate of 250 kW) due to the interconnection with the electric utility. There were 18 shutdowns during the first year and most were brief. The ability of this plant to operate in the island mode improved availability by 3 to 4%. Events that would normally be shutdowns were simply island mode events. The mean time between failure was calculated at 239 hours, or slightly

  7. A statistical evaluation of formation disturbance produced by well- casing installation methods

    Science.gov (United States)

    Morin, R.H.; LeBlanc, D.R.; Teasdale, W.E.

    1988-01-01

    Water-resources investigations concerned with contaminant transport through aquifers comprised of very loose, unconsolidated sediments have shown that small-scale variations in aquifer characteristics can significantly affect solute transport and dispersion. Commonly, measurement accuracy and resolution have been limited by a borehole environment consisting of an annulus of disturbed sediments produced by the casing-installation method. In an attempt to quantify this disturbance and recognize its impact on the characterization of unconsolidated deposits, three installation methods were examined and compared in a sand-and-gravel outwash at a test site on Cape Cod, Massachusetts. These installation methods were: 1) casing installed in a mud-rotary hole; 2) casing installed in an augered hole; and 3) flush-joint steel casing hammer-driven from land surface. Fifteen wells were logged with epithermal neutron and natural gamma tools. Concludes that augering is the most disruptive of the three casing-installation methods and that driving casing directly, though typically a more time-consuming operation, transmits the least amount of disturbance into the surrounding formation. -from Authors

  8. A Precipitation-Runoff Model for the Blackstone River Basin, Massachusetts and Rhode Island

    Science.gov (United States)

    Barbaro, Jeffrey R.; Zarriello, Phillip J.

    2007-01-01

    Survey cooperative streamflow-gaging network, and at seven partial-record stations installed in 2004 for this study. Because the model-calibration period preceded data collection at the partial-record stations, a continuous streamflow record was estimated at these stations by correlation with flows at nearby continuous-record stations to provide additional streamflow data for model calibration. Water-use information was compiled for 1996-2001 and included municipal and commercial/industrial withdrawals, private residential withdrawals, golf-course withdrawals, municipal wastewater-return flows, and on-site septic effluent return flows. Streamflow depletion was computed for all time-varying ground-water withdrawals prior to simulation. Water-use data were included in the model to represent the net effect of water use on simulated hydrographs. Consequently, the calibrated values of the hydrologic parameters better represent the hydrologic response of the basin to precipitation. The model was calibrated for 1997-2001 to coincide with the land-use and water-use data compiled for the study. Four long-term stations (Nipmuc River near Harrisville, Rhode Island; Quinsigamond River at North Grafton, Massachusetts; Branch River at Forestdale, Rhode Island; and Blackstone River at Woonsocket, Rhode Island) that monitor flow at 3.3, 5.4, 19, and 88 percent of the total basin area, respectively, provided the primary model-calibration points. Hydrographs, scatter plots, and flow-duration curves of observed and simulated discharges, along with various model-fit statistics, indicated that the model performed well over a range of hydrologic conditions. For example, the total runoff volume for the calibration period simulated at the Nipmuc River near Harrisville, Rhode Island; Quinsigamond River at North Grafton, Massachusetts; Branch River at Forestdale, Rhode Island; and Blackstone River at Woonsocket, Rhode Island streamflow-gaging stations differed from the observed runoff v

  9. Tropical storm Irene flood of August 2011 in northwestern Massachusetts

    Science.gov (United States)

    Bent, Gardner C.; Olson, Scott A.; Massey, Andrew J.

    2016-09-02

    A Presidential disaster was declared in northwestern Massachusetts, following flooding from tropical storm Irene on August 28, 2011. During the storm, 3 to 10 inches of rain fell on soils that were susceptible to flash flooding because of wet antecedent conditions. The gage height at one U.S. Geological Survey streamgage rose nearly 20 feet in less than 4 hours because of the combination of saturated soils and intense rainfall. On August 28, 2011, in the Deerfield and Hoosic River Basins in northwestern Massachusetts, new peaks of record were set at six of eight U.S. Geological Survey long-term streamgages with 46 to 100 years of record. Additionally, high-water marks were surveyed and indirect measurements of peak discharge were calculated at two discontinued streamgages in the Deerfield and Hoosic River Basins with 24 and 61 years of record, respectively. This data resulted in new historic peaks of record at the two discontinued streamgages from tropical storm Irene.

  10. Sea-floor texture and physiographic zones of the inner continental shelf from Salisbury to Nahant, Massachusetts, including the Merrimack Embayment and Western Massachusetts Bay

    Science.gov (United States)

    Pendleton, Elizabeth E.; Barnhardt, Walter A.; Baldwin, Wayne E.; Foster, David S.; Schwab, William C.; Andrews, Brian D.; Ackerman, Seth D.

    2015-10-26

    A series of maps that describe the distribution and texture of sea-floor sediments and physiographic zones of Massachusetts State waters from Nahant to Salisbury, Massachusetts, including western Massachusetts Bay, have been produced by using high-resolution geophysical data (interferometric and multibeam swath bathymetry, lidar bathymetry, backscatter intensity, and seismic reflection profiles), sediment samples, and bottom photographs. These interpretations are intended to aid statewide efforts to inventory and manage coastal and marine resources, link with existing data interpretations, and provide information for research focused on coastal evolution and environmental change. Marine geologic mapping of the inner continental shelf of Massachusetts is a statewide cooperative effort of the U.S. Geological Survey and the Massachusetts Office of Coastal Zone Management.

  11. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  12. Highlighting High Performance: Whitman Hanson Regional High School; Whitman, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    2006-06-01

    This brochure describes the key high-performance building features of the Whitman-Hanson Regional High School. The brochure was paid for by the Massachusetts Technology Collaborative as part of their Green Schools Initiative. High-performance features described are daylighting and energy-efficient lighting, indoor air quality, solar and wind energy, building envelope, heating and cooling systems, water conservation, and acoustics. Energy cost savings are also discussed.

  13. Expanding access to naloxone for family members: The Massachusetts experience.

    Science.gov (United States)

    Bagley, Sarah M; Forman, Leah S; Ruiz, Sarah; Cranston, Kevin; Walley, Alexander Y

    2018-05-01

    The Massachusetts Department of Public Health Overdose Education and Naloxone Distribution Program provides overdose education and naloxone rescue kits to people at risk for overdose and bystanders, including family members. Using Massachusetts Department of Public Health data, the aims are to: (i) describe characteristics of family members who receive naloxone; (ii) identify where family members obtain naloxone; and (iii) describe characteristics of rescues by family members. We conducted a retrospective review using program enrollee information collected on a standardised form between 2008 and 2015. We calculated descriptive statistics, including demographics, current substance use, enrolment location, history of witnessed overdoses and rescue attempt characteristics. We conducted a stratified analysis comparing family members who used drugs with those who did not. Family members were 27% of total program enrollees (n = 10 883/40 801). Family members who reported substance use (n = 4679) were 35.6 years (mean), 50.6% female, 76.3% non-Hispanic white, 75.6% had witnessed an overdose, and they obtained naloxone most frequently at HIV prevention programs. Family members who did not report substance use (n = 6148) were 49.2 years (mean), 73.8% female, 87.9% non-Hispanic white, 35.3% had witnessed an overdose, and they obtained naloxone most frequently at community meetings. Family members were responsible for 20% (n = 860/4373) of the total rescue attempts. The Massachusetts experience demonstrates that family members can be active participants in responding to the overdose epidemic by rescuing family members and others. Targeted intervention strategies for families should be included in efforts to expand overdose education and naloxone in Massachusetts. © 2017 Australasian Professional Society on Alcohol and other Drugs.

  14. Economic Disparities and Syphilis Incidence in Massachusetts, 2001-2013.

    Science.gov (United States)

    Smock, Laura; Caten, Evan; Hsu, Katherine; DeMaria, Alfred

    We used area-level indicators of poverty to describe economic disparities in the incidence rate of infectious syphilis in Massachusetts to (1) determine whether methods developed in earlier AIDS analyses in Massachusetts could be applied to syphilis and (2) characterize syphilis trends during a time of increased rates of syphilis incidence. Using census tract data and population counts from the US Census Bureau and Massachusetts data on syphilis, we analyzed the incidence rate of syphilis infection from 2001 to 2013 by the poverty level of the census tract in which people with syphilis resided, stratified by age, sex, and race/ethnicity. The syphilis incidence rate increased in all census tract groups in Massachusetts from 2001 to 2013, and disparities in incidence rates by area poverty level persisted over time. The overall incidence rate of syphilis increased 6.9-fold from 2001 to 2013 in all census tract poverty-level groupings (from 1.5 to 10.3 per 100 000 population), but the rise in rate was especially high in the poorest census tracts (from 5.6 to 31.0 per 100 000 population) and among men (from 2.2 to 19.4 per 100 000 population). The highest syphilis incidence rate was among non-Hispanic black people. The largest changes in incidence rate occurred after 2010. One region had a disproportionate increase in incidence rates and a disproportionate impact on the statewide trend. Census tract poverty analyses can inform the targeting of interventions that make progress toward reducing disparities in rates of syphilis incidence possible.

  15. Purchasing power: business and health policy change in Massachusetts.

    Science.gov (United States)

    Bergthold, L A

    1988-01-01

    As in many states around the country, health care costs in Massachusetts had risen to an unprecedented proportion of the state budget by the early 1980s. State health policymakers realized that dramatic changes were needed in the political process to break provider control over health policy decisions. This paper presents a case study of policy change in Massachusetts between 1982 and 1988. State officials formulated a strategy to mobilize corporate interests, which were already awakening to the problems of high health care costs, as a countervailing power to the political monopoly of provider interests. Once mobilized, business interests became organized politically and even became dominant at times, controlling both the policy agenda and its process. Ultimately, business came to be viewed as a permanent part of the coalitions and commissions that helped formulate state health policy. Although initially allied with provider interests, business eventually forged a stronger alliance with the state, an alliance that has the potential to force structural change in health care politics in Massachusetts for years to come. The paper raises questions about the consequences of such alliances between public and private power for both the content and the process of health policymaking at the state level.

  16. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  17. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  18. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  19. Bathymetry of the waters surrounding the Elizabeth Islands, Massachusetts

    Science.gov (United States)

    Pendleton, Elizabeth A.; Andrews, Brian D.; Ackerman, Seth D.; Twichell, Dave

    2014-01-01

    The Elizabeth Islands in Massachusetts that separate Vineyard Sound from Buzzards Bay are the remnants of a moraine (unconsolidated glacial sediment deposited at an ice sheet margin; Oldale and O’Hara, 1984). The most recent glacial ice retreat in this region occurred between 25,000 and 20,000 years ago, and the subsequent rise in sea level that followed deglaciation caused differences in the seafloor character between Buzzards Bay and Vineyard Sound. The relatively rough seafloor of Vineyard Sound reflects widespread exposure of glacial material. Shoals mark the location of recessional ice contact material, and deep channels illustrate where meltwater drainage incised glacial deposits. Following ice retreat from the Elizabeth Islands, a glacial lake formed across the mouth of Buzzards Bay, when the lake drained, it scoured two deep channels at the southern end of the bay. Sea level rise began to inundate Vineyard Sound and Buzzards Bay about 8,000 years ago and continues to modify the modern seafloor (Robb and Oldale, 1977). Fine-grained marine and estuarine sediments were deposited in the partially protected setting of Buzzards Bay. These deposits, up to 10 meters in thickness, buried the high-relief glacial landscape and created the generally smooth modern seafloor. In contrast, the Vineyard Sound of today experiences strong tidal currents, which largely prevent the deposition of fine-grained material and constantly rework the glacial sand and gravel within shoals. The seafloor of the sound largely reflects the contours of the ancient glaciated landscape that existed before sea level began to rise. The bathymetric data used to create the hillshaded relief image of the seafloor were collected by the U.S. Geological Survey (USGS) in cooperation with the Massachusetts Office of Coastal Zone Management and supplemented with National Oceanic and Atmospheric Administration hydrographic survey data. The map shows the detailed bathymetry of Buzzards Bay and Vineyard

  20. Massachusetts' participation in the US Department of Energy's Crystalline Repository Project: Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The purpose of this report is to review activities of the Crystalline Rock Project in Massachusetts, the context in which it arose, and the implications and possibilities of future federal policy decisions on the siting of a high-level waste repository in a crystalline rock body. Although Massachusetts has been eliminated from consideration, there are still issues of concern to be resolved regarding the potential impacts upon Massachusetts if a site were ever to be chosen in New England

  1. Massachusetts' participation in the US Department of Energy's Crystalline Repository Project: Final report

    International Nuclear Information System (INIS)

    Dukakis, M.S.; Johnston, P.W.; Walker, B. Jr.

    1986-12-01

    The purpose of this report is to review activities of the Crystalline Rock Project (CRP) in Massachusetts, the context in which it arose, and the implications and possibilities of future federal policy decisions on the siting of a HLW repository in a crystalline rock body. Although Massachusetts has been eliminated from consideration, there are still issues of concern to be resolved regarding the potential impacts upon Massachusetts if a site were ever to be chosen in New England

  2. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  3. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  4. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  5. The proton therapy system for Massachusetts General Hospital's Northeast Proton Therapy Center

    International Nuclear Information System (INIS)

    Jongen, Y.

    1996-01-01

    In 1989, two companies, Ion Beam Applications in Belgium (IBA) and Sumitomo Heavy Industries in Japan (SHI) started to design proton therapy equipments based on cyclotrons. In 1991, SHI and IBA decided to join their development efforts in this field. In 1993, the Massachusetts General Hospital (MGH), pioneer in the field of proton therapy, launched an international request for proposals for the procurement of an in-hospital proton therapy facility. The 18 may 1994, the contract was signed with a team of industries led by IBA, including also SHI and General Atomics (GA) of California. The proposed system is based on a fixed energy, isochronous cyclotron, followed by an energy degrader and an energy selection system. The variable energy beam can be rapidly switched in any one of three treatment rooms. Two rooms are equipped with large isocentric gantries and robotic patient positioners allowing to direct the proton beam within the patient from any direction. The third room is equipped with fixed horizontal beam. The complete system is computer controlled by a distributed network of computers, programmable logic controllers and workstations. This computer control allows to change the energy in one treatment room is less than two second, a performance matching or exceeding the flexibility offered by synchrotrons. The system is now built and undergoing factory tests. The beam has been accelerated to full energy in the cyclotron, and beam extraction tests are underway. Installation in the hospital building will take place in 1997. (author)

  6. Regional Charging Infrastructure for Plug-In Electric Vehicles: A Case Study of Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Raghavan, Sesha [National Renewable Energy Lab. (NREL), Golden, CO (United States); Rames, Clement [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eichman, Joshua [National Renewable Energy Lab. (NREL), Golden, CO (United States); Melaina, Marc [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-01-01

    Given the complex issues associated with plug-in electric vehicle (PEV) charging and options in deploying charging infrastructure, there is interest in exploring scenarios of future charging infrastructure deployment to provide insight and guidance to national and regional stakeholders. The complexity and cost of PEV charging infrastructure pose challenges to decision makers, including individuals, communities, and companies considering infrastructure installations. The value of PEVs to consumers and fleet operators can be increased with well-planned and cost-effective deployment of charging infrastructure. This will increase the number of miles driven electrically and accelerate PEV market penetration, increasing the shared value of charging networks to an expanding consumer base. Given these complexities and challenges, the objective of the present study is to provide additional insight into the role of charging infrastructure in accelerating PEV market growth. To that end, existing studies on PEV infrastructure are summarized in a literature review. Next, an analysis of current markets is conducted with a focus on correlations between PEV adoption and public charging availability. A forward-looking case study is then conducted focused on supporting 300,000 PEVs by 2025 in Massachusetts. The report concludes with a discussion of potential methodology for estimating economic impacts of PEV infrastructure growth.

  7. Risk Characterization for Future Training Scenarios at the Massachusetts Military Reservation (MMR)

    National Research Council Canada - National Science Library

    Zakikhani, Mansour

    2004-01-01

    This study was conducted to evaluate potential human and ecological health risks associated with emission of pyrotechnic compounds during future training exercises at the Massachusetts Military Reservation...

  8. Risk Characterization for Future Training Scenarios at the Massachusetts Military Reservation (MMR), Final Results

    National Research Council Canada - National Science Library

    Zakikhani, Mansour; Dortch, Mark S; Gerald, Jeffrey A; Hawkins, Melanie S

    2005-01-01

    This study was conducted to evaluate potential human and ecological health risks associated with emission of pyrotechnic compounds during future training exercises at the Massachusetts Military Reservation...

  9. LightLeaves: computer controlled kinetic reflection hologram installation and a brief discussion of earlier work

    International Nuclear Information System (INIS)

    Connors Chen, Betsy

    2013-01-01

    LightLeaves is an installation combining leaf shaped, white light reflection holograms of landscape images with a special kinetic lighting device that houses a lamp and moving leaf shaped masks. The masks are controlled by an Arduino microcontroller and servomotors that position the masks in front of the illumination source of the holograms. The work is the most recent in a long series of landscapes that combine multi-hologram installations with computer controlled devices that play with the motion of the holograms, the light, sound or other elements in the work. LightLeaves was first exhibited at the Peabody Essex Museum in Salem, Massachusetts in a show titled E ye Spy: Playing with Perception .

  10. LightLeaves: computer controlled kinetic reflection hologram installation and a brief discussion of earlier work

    Energy Technology Data Exchange (ETDEWEB)

    Connors Chen, Betsy, E-mail: acmeholo@gmail.com [ACME Holography, Somerville, Massachusetts USA 02144 (United States)

    2013-02-22

    LightLeaves is an installation combining leaf shaped, white light reflection holograms of landscape images with a special kinetic lighting device that houses a lamp and moving leaf shaped masks. The masks are controlled by an Arduino microcontroller and servomotors that position the masks in front of the illumination source of the holograms. The work is the most recent in a long series of landscapes that combine multi-hologram installations with computer controlled devices that play with the motion of the holograms, the light, sound or other elements in the work. LightLeaves was first exhibited at the Peabody Essex Museum in Salem, Massachusetts in a show titled {sup E}ye Spy: Playing with Perception{sup .}.

  11. Long-Term Oceanographic Observations in Western Massachusetts Bay Offshore of Boston, Massachusetts: Data Report for 1989-2002

    Science.gov (United States)

    Butman, Bradford; Bothner, Michael H.; Alexander, P. Soupy; Lightsom, Frances L.; Martini, Marinna A.; Gutierrez, Benjamin T.; Strahle, William S.

    2004-01-01

    This data report presents long-term oceanographic observations made in western Massachusetts Bay at two locations: (1) 42 deg 22.6' N., 70 deg 47.0' W. (Site A, 33 m water depth) from December 1989 through December 2002 (figure 1), and (2) 42 deg 9.8' N., 70 deg 38.4' W. (Site B, 21 m water depth) from October 1997 through December 2002. Site A is approximately 1 km south of the new ocean outfall that began discharging treated sewage effluent from the Boston metropolitan area into Massachusetts Bay on September 6, 2000. These long-term oceanographic observations have been collected by the U.S. Geological Survey (USGS) in partnership with the Massachusetts Water Resources Authority (MWRA) and with logistical support from the U.S. Coast Guard (USCG - http://www.uscg.mil). This report presents time series data through December 2002, updating a similar report that presented data through December 2000 (Butman and others, 2002). In addition, the Statistics and Mean Flow sections include some new plots and tables and the format of the report has been streamlined by combining yearly figures into single .pdfs. Figure 1 (PDF format) The long-term measurements are planned to continue at least through 2005. The long-term oceanographic observations at Sites A and B are part of a USGS study designed to understand the transport and long-term fate of sediments and associated contaminants in the Massachusetts bays. (See http://woodshole.er.usgs.gov/project-pages/bostonharbor/ and Butman and Bothner, 1997.) The long-term observations document seasonal and inter-annual changes in currents, hydrography, and suspended-matter concentration in western Massachusetts Bay, and the importance of infrequent catastrophic events, such as major storms or hurricanes, in sediment resuspension and transport. They also provide observations for testing numerical models of circulation. This data report presents a description of the field program and instrumentation, an overview of the data through

  12. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  13. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  14. Prevalence of Anaplasma phagocytophilum infection in feral cats in Massachusetts.

    Science.gov (United States)

    Galemore, Erin R; Labato, Mary A; O'Neil, Elizabeth

    2018-01-01

    The primary objective of this study was to determine the prevalence of Anaplasma phagocytophilum infection and exposure in adult feral cats in Massachusetts, an endemic area for A phagocytophilum and its tick vector Ixodes scapularis . The secondary objective was to determine if there were correlations between A phagocytophilum infection and the presence of anemia and thrombocytopenia. Blood samples were collected between June and December 2015 from 175 apparently healthy adult feral cats that were presented to trap and release spay/neuter centers in Massachusetts. Complete blood count, blood smear evaluation, SNAP 4Dx Plus test (IDEXX) and A phagocytophilum PCR were performed on all samples to document acute infection (PCR-positive and/or inclusions observed on blood smear) and exposure to A phagocytophilum (SNAP 4Dx Plus-positive for A phagocytophilum antibodies). The prevalence of exposure to A phagocytophilum in feral cats in Massachusetts was 9.7%, whereas the prevalence of acute infection was 6.9%. All blood smears were negative for Anaplasma species inclusions; therefore, acute infection was defined as testing positive on PCR analysis. No statistically significant correlations were identified for cats that were positive for A phagocytophilum on PCR analysis or SNAP 4Dx Plus test and the presence of anemia or thrombocytopenia. The prevalence of A phagocytophilum exposure in feral cats approaches 10% and is higher than the previously reported national average prevalence of 4.3% in the USA. A phagocytophilum infection may be an emerging infectious disease in cats. Further research is needed to determine the prevalence of clinical illness associated with A phagocytophilum infection in cats living in endemic areas.

  15. Prevalence of infection in feral cats in Massachusetts

    Directory of Open Access Journals (Sweden)

    Erin R Galemore

    2018-01-01

    Full Text Available Objectives The primary objective of this study was to determine the prevalence of Anaplasma phagocytophilum infection and exposure in adult feral cats in Massachusetts, an endemic area for A phagocytophilum and its tick vector Ixodes scapularis . The secondary objective was to determine if there were correlations between A phagocytophilum infection and the presence of anemia and thrombocytopenia. Methods Blood samples were collected between June and December 2015 from 175 apparently healthy adult feral cats that were presented to trap and release spay/neuter centers in Massachusetts. Complete blood count, blood smear evaluation, SNAP 4Dx Plus test (IDEXX and A phagocytophilum PCR were performed on all samples to document acute infection (PCR-positive and/or inclusions observed on blood smear and exposure to A phagocytophilum (SNAP 4Dx Plus-positive for A phagocytophilum antibodies. Results The prevalence of exposure to A phagocytophilum in feral cats in Massachusetts was 9.7%, whereas the prevalence of acute infection was 6.9%. All blood smears were negative for Anaplasma species inclusions; therefore, acute infection was defined as testing positive on PCR analysis. No statistically significant correlations were identified for cats that were positive for A phagocytophilum on PCR analysis or SNAP 4Dx Plus test and the presence of anemia or thrombocytopenia. Conclusions and relevance The prevalence of A phagocytophilum exposure in feral cats approaches 10% and is higher than the previously reported national average prevalence of 4.3% in the USA. A phagocytophilum infection may be an emerging infectious disease in cats. Further research is needed to determine the prevalence of clinical illness associated with A phagocytophilum infection in cats living in endemic areas.

  16. Team Massachusetts & Central America Solar Decathlon 2015 Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kenneth [Western New England Univ., Springfield, MA (United States)

    2016-04-29

    Our team was Team MASSCA (Massachusetts and Central America), which was a partnership of Western New England University (WNE) located in Massachusetts USA, The Technological University of Panama (UTP), and Central American Technological University (UNITEC) of Honduras. Together we had a group of 6 faculty members and approximately 30 undergraduate students. Our house is ‘The EASI’ House, which stands for Efficient, Affordable, Solar Innovation. The EASI house is rectangular with two bedrooms and one bath, and offers a total square footage of 680. Based on competition estimates, The EASI house costs roughly $121,000. The EASI house has a 5kW solar system. Faculty and students from all three institutions were represented at the competition in Irvine California. Team MASSCA did well considering this was our first entry in the Solar Decathlon competition. Team MASSCA won the following awards: First Place – Affordability Contest Second Place – Energy Balance Contest. The competition provided a great experience for our students (and faculty as well). This competition provided leadership, endurance, and technical knowledge/skills for our students, and was the single most important hands-on experience during their undergraduate years. We are extremely pleased with the awards we received. At the same time we have learned from our efforts and would do better if we were to compete in the future. Furthermore, as a result of our team’s Inter-Americas collaborative effort, UTP and WNE have partnered to form Team PANAMASS (PANAma and MASSachusetts) and have developed The 3 SMART House for the inaugural Solar Decathlon Latin America & Caribbean competition held in Colombia.

  17. Massachusetts health reform: employer coverage from employees' perspective.

    Science.gov (United States)

    Long, Sharon K; Stockley, Karen

    2009-01-01

    The national health reform debate continues to draw on Massachusetts' 2006 reform initiative, with a focus on sustaining employer-sponsored insurance. This study provides an update on employers' responses under health reform in fall 2008, using data from surveys of working-age adults. Results show that concerns about employers' dropping coverage or scaling back benefits under health reform have not been realized. Access to employer coverage has increased, as has the scope and quality of their coverage as assessed by workers. However, premiums and out-of-pocket costs have become more of an issue for employees in small firms.

  18. Power options: the Massachusetts nonprofit energy purchasers consortium

    International Nuclear Information System (INIS)

    Hayes, J.

    1999-01-01

    A series of overhead viewgraphs described some of the topics that were discussed at this workshop. A corporate review of the Massachusetts Health and Educational Facilities Authority (HEFA) was presented. HEFA was formed in 1968 to provide cost savings in electric bills to health, education, cultural and other non profit organizations. The methods that HEFA uses to achieve this goal is to provide energy services with either fixed prices or with two-year or five-year options. Since their creation HEFA has a total of 100 signed natural gas contracts and 300 signed electricity contracts

  19. Planned Parenthood League of Massachusetts v. Attorney General.

    Science.gov (United States)

    1997-03-18

    The Supreme Judicial Court of Massachusetts sustained a state statute which required pregnant unmarried minors to obtain the consent of both parents or a judge of the Superior Court in order to have an abortion. The court held that the state's interest in protecting the welfare of its minors and ensuring informed consent justified restrictions on a minor's constitutional right to choose an abortion. The court held unconstitutional, however, the law's requirement that the minor obtain the consent of both parents as an undue burden on the minor's due process rights.

  20. Primary care closed claims experience of Massachusetts malpractice insurers.

    Science.gov (United States)

    Schiff, Gordon D; Puopolo, Ann Louise; Huben-Kearney, Anne; Yu, Winnie; Keohane, Carol; McDonough, Peggy; Ellis, Bonnie R; Bates, David W; Biondolillo, Madeleine

    Despite prior focus on high-impact inpatient cases, there are increasing data and awareness that malpractice in the outpatient setting, particularly in primary care, is a leading contributor to malpractice risk and claims. To study patterns of primary care malpractice types, causes, and outcomes as part of a Massachusetts ambulatory malpractice risk and safety improvement project. Retrospective review of pooled closed claims data of 2 malpractice carriers covering most Massachusetts physicians during a 5-year period (January 1, 2005, through December 31, 2009). Data were harmonized between the 2 insurers using a standardized taxonomy. Primary care practices in Massachusetts. All malpractice claims that involved primary care practices insured by the 2 largest insurers in the state were screened. A total of 551 claims from primary care practices were identified for the analysis. Numbers and types of claims, including whether claims involved primary care physicians or practices; classification of alleged malpractice (eg, misdiagnosis or medication error); patient diagnosis; breakdown in care process; and claim outcome (dismissed, settled, verdict for plaintiff, or verdict for defendant). During a 5-year period there were 7224 malpractice claims of which 551 (7.7%) were from primary care practices. Allegations were related to diagnosis in 397 (72.1%), medications in 68 (12.3%), other medical treatment in 41 (7.4%), communication in 15 (2.7%), patient rights in 11 (2.0%), and patient safety or security in 8 (1.5%). Leading diagnoses were cancer (n = 190), heart diseases (n = 43), blood vessel diseases (n = 27), infections (n = 22), and stroke (n = 16). Primary care cases were significantly more likely to be settled (35.2% vs 20.5%) or result in a verdict for the plaintiff (1.6% vs 0.9%) compared with non-general medical malpractice claims (P < .001). In Massachusetts, most primary care claims filed are related to alleged misdiagnosis. Compared with malpractice

  1. Elementary Particle Physics Experiment at the University of Massachusetts, Amherst

    Energy Technology Data Exchange (ETDEWEB)

    Brau, Benjamin; Dallapiccola, Carlo; Willocq, Stephane

    2013-07-30

    In this progress report we summarize the activities of the University of Massachusetts- Amherst group for the three years of this research project. We are fully engaged in research at the energy frontier with the ATLAS experiment at the CERN Large Hadron Collider. We have made leading contributions in software development and performance studies for the ATLAS Muon Spectrometer, as well as on physics analysis with an emphasis on Standard Model measurements and searches for physics beyond the Standard Model. In addition, we have increased our contributions to the Muon Spectrometer New Small Wheel upgrade project.

  2. Advancing LGBT Elder Policy and Support Services: The Massachusetts Model.

    Science.gov (United States)

    Krinsky, Lisa; Cahill, Sean R

    2017-12-01

    The Massachusetts-based LGBT Aging Project has trained elder service providers in affirming and culturally competent care for LGBT older adults, supported development of LGBT-friendly meal programs, and advanced LGBT equality under aging policy. Working across sectors, this innovative model launched the country's first statewide Legislative Commission on Lesbian, Gay, Bisexual, and Transgender Aging. Advocates are working with policymakers to implement key recommendations, including cultural competency training and data collection in statewide networks of elder services. The LGBT Aging Project's success provides a template for improving services and policy for LGBT older adults throughout the country.

  3. Massachusetts Shoreline Change Mapping and Analysis Project, 2013 Update

    Science.gov (United States)

    Thieler, E. Robert; Smith, Theresa L.; Knisel, Julia M.; Sampson, Daniel W.

    2013-01-01

    Information on rates and trends of shoreline change can be used to improve the understanding of the underlying causes and potential effects of coastal erosion on coastal populations and infrastructure and can support informed coastal management decisions. In this report, we summarize the changes in the historical positions of the shoreline of the Massachusetts coast for the 165 years from 1844 through 2009. The study area includes the Massachusetts coastal region from Salisbury to Westport, including Cape Cod, as well as Martha’s Vineyard, Nantucket, and the Elizabeth Islands. New statewide shoreline data were developed for approximately 1,804 kilometers (1,121 miles) of shoreline using color aerial orthoimagery from 2008 and 2009 and topographic lidar from 2007. The shoreline data were integrated with existing historical shoreline data from the U.S. Geological Survey (USGS) and Massachusetts Office of Coastal Zone Management (CZM) to compute long- (about 150 years) and short-term (about 30 years) rates of shoreline change. A linear regression method was used to calculate long- and short-term rates of shoreline change at 26,510 transects along the Massachusetts coast. In locations where shoreline data were insufficient to use the linear regression method, short-term rates were calculated using an end-point method. Long-term rates of shoreline change are calculated with (LTw) and without (LTwo) shorelines from the 1970s and 1994 to examine the effect of removing these data on measured rates of change. Regionally averaged rates are used to assess the general characteristics of the two-rate computations, and we find that (1) the rates of change for both LTw and LTwo are essentially the same; (2) including more data slightly reduces the uncertainty of the rate, which is expected as the number of shorelines increases; and (3) the data for the shorelines from the 1970s and 1994 are not outliers with respect to the long-term trend. These findings are true for regional

  4. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  5. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  6. Expanding Access to Vocational-Technical Education in Massachusetts. White Paper No. 136

    Science.gov (United States)

    Ardon, Ken; Fraser, Alison L.

    2015-01-01

    It is clear from assessment, graduation, and follow-up data that career-vocational technical education (CVTE), as it is practiced in Massachusetts, is a success. CVTE is becoming so popular that there are up to 5,000 more applicants for places in Massachusetts' vocational technical schools than there are openings, creating waiting lists. This…

  7. 78 FR 5350 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2013-01-25

    ...] Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On December 7, 2012 Massachusetts submitted an application to...

  8. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Science.gov (United States)

    2013-01-31

    ..., Cambridge, MA 02142, Monday through Friday 8:00 a.m.-4:30 p.m., 617-494-2419, [email protected]dot.gov . For the Massachusetts Department of Transportation Highway Division (MassDOT): Ms. Mary Hynes, Project Manager... on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT...

  9. What's under the Golden Dome? A Children's Guide to the Massachusetts State House. [Update.

    Science.gov (United States)

    Commonwealth of Massachusetts, Boston. Tours and Government Education Division.

    This booklet takes children on a tour of one of the oldest and most historic State Houses in the nation, that of Massachusetts. The booklet explains that the State House is the workplace of the Governor, the Legislature, and constitutional officers. It offers a historical overview of the Massachusetts State House. The first one was built in 1712,…

  10. Starting Young: Massachusetts Birth-3rd Grade Policies That Support Children's Literacy Development

    Science.gov (United States)

    Cook, Shayna; Bornfreund, Laura

    2015-01-01

    Massachusetts is one of a handful of states that is often recognized as a leader in public education, and for good reason. The Commonwealth consistently outperforms most states on national reading and math tests and often leads the pack in education innovations. "Starting Young: Massachusetts Birth-3rd Grade Policies that Support Children's…

  11. The Massachusetts Community Colleges Developmental Education Best Policy and Practice Audit: Final Report

    Science.gov (United States)

    Sperling, Charmian

    2009-01-01

    The purpose of this study, funded by Jobs for the Future through a grant to the Massachusetts Community Colleges Executive Office, was to: (1) provide an update on the status of developmental education within Massachusetts community colleges; (2) shed light on the alignment between research-based best practices to advance success among…

  12. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  13. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  14. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  15. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  16. YB0 SERVICES INSTALLATION COMPLETED

    CERN Document Server

    The beauty of the completed YB0 was briefly visible at P5 as preparations continue for Tracker installation. A tremendous effort, lasting 7 months and involving more than 100 workers on the busiest days, resulted in 5700 electrical cables, 780 optical cables with 65k fibre channels, and 550 pipes laid on YB0 for HB, EB and Tracker.

  17. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  18. Preliminary assessment of factors influencing riverine fish communities in Massachusetts.

    Science.gov (United States)

    Armstrong, David S.; Richards, Todd A.; Brandt, Sara L.

    2010-01-01

    The U.S. Geological Survey, in cooperation with the Massachusetts Department of Conservation and Recreation (MDCR), Massachusetts Department of Environmental Protection (MDEP), and the Massachusetts Department of Fish and Game (MDFG), conducted a preliminary investigation of fish communities in small- to medium-sized Massachusetts streams. The objective of this investigation was to determine relations between fish-community characteristics and anthropogenic alteration, including flow alteration and impervious cover, relative to the effect of physical basin and land-cover (environmental) characteristics. Fish data were obtained for 756 fish-sampling sites from the Massachusetts Division of Fisheries and Wildlife fish-community database. A review of the literature was used to select a set of fish metrics responsive to flow alteration. Fish metrics tested include two fish-community metrics (fluvial-fish relative abundance and fluvial-fish species richness), and five indicator species metrics (relative abundance of brook trout, blacknose dace, fallfish, white sucker, and redfin pickerel). Streamflows were simulated for each fish-sampling site using the Sustainable Yield Estimator application (SYE). Daily streamflows and the SYE water-use database were used to determine a set of indicators of flow alteration, including percent alteration of August median flow, water-use intensity, and withdrawal and return-flow fraction. The contributing areas to the fish-sampling sites were delineated and used with a Geographic Information System (GIS) to determine a set of environmental characteristics, including elevation, basin slope, percent sand and gravel, percent wetland, and percent open water, and a set of anthropogenic-alteration variables, including impervious cover and dam density. Two analytical techniques, quantile regression and generalized linear modeling, were applied to determine the association between fish-response variables and the selected environmental and

  19. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  20. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  1. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  2. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  3. Quality assurance in nuclear installations

    International Nuclear Information System (INIS)

    Torres M, Nelson.

    1985-08-01

    It has been proven that the bad quality of products, equipment, installations, and services is not due to the lack of tests, experiments and verifications. The main causes are associated with insufficient organization of the activities that have influence on the quality. The garantee of quality is conceptualized as an appropriate instrument composed of normalized criteria initially in advanced technologies. Such as nuclear science and aerospace technology. However, with the appropriate modifications it can be applied to conventional technologies

  4. Method of installing well conductors

    International Nuclear Information System (INIS)

    Houser, D.M.

    1991-01-01

    This patent describes a method of installing a well conductor in a marine environment. It comprises sealing a well conductor with a watertight plug; submerging the conductor from an elevated platform; adding additional conductor lengths to the conductor as needed thereby forming a conductor string; adjusting the buoyancy of the string to control the lowering of the string to the sea floor; and drilling through the plug after the conductor string has achieved the desired penetration depth

  5. Seismic evaluation of nuclear installations

    International Nuclear Information System (INIS)

    Mattar Neto, Miguel

    1997-01-01

    Some considerations regarding extreme external events, natural or man-induce, such as earthquakes, floods, air crashes, etc, shall be done for nuclear facilities to minimizing the potential impact of the installation on the public and the environment. In this paper the main aspects of the seismic evaluation of nuclear facilities (except the nuclear power reactors) will be presented based on different codes and standards. (author). 7 refs., 2 tabs

  6. Mounting clips for panel installation

    Science.gov (United States)

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  7. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  8. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  9. Massachusetts state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  10. Drainage divides, Massachusetts; Blackstone and Thames River basins

    Science.gov (United States)

    Krejmas, Bruce E.; Wandle, S. William

    1982-01-01

    Drainage boundaries for selected subbasins of the Blackstone and Thames River basins in eastern Hampden, eastern Hampshire, western Norfolk, southern Middlesex, and southern Worcester Counties, Massachusetts, are delineated on 12 topographic quadrangle maps at a scale of 1:24,000. Drainage basins are shown for all U.S. Geological Survey data-collection sites and for mouths of major rivers. Drainage basins are shown for the outlets of lakes or ponds and for streams where the drainage area is greater than 3 square miles. Successive sites along watercourses are indicated where the intervening area is at least 6 miles on tributary streams or 15 square miles along the Blackstone River, French River, or Quinebaug River. (USGS)

  11. Massachusetts state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  12. The 3D Elevation Program: summary for Massachusetts

    Science.gov (United States)

    Carswell, William J.

    2014-01-01

    Elevation data are essential to a broad range of applications, including forest resources management, wildlife and habitat management, national security, recreation, and many others. For the Commonwealth of Massachusetts, elevation data are critical for flood risk management, natural resources conservation, agriculture and precision farming, infrastructure and construction management, coastal zone management, and other business uses. Today, high-density light detection and ranging (lidar) data are the primary sources for deriving elevation models and other datasets. Federal, State, Tribal, and local agencies work in partnership to (1) replace data that are older and of lower quality and (2) provide coverage where publicly accessible data do not exist. A joint goal of State and Federal partners is to acquire consistent, statewide coverage to support existing and emerging applications enabled by lidar data.

  13. Storm-driven sediment transport in Massachusetts Bay

    Science.gov (United States)

    Warner, J.C.; Butman, B.; Dalyander, P.S.

    2008-01-01

    Massachusetts Bay is a semi-enclosed embayment in the western Gulf of Maine about 50 km wide and 100 km long. Bottom sediment resuspension is controlled predominately by storm-induced surface waves and transport by the tidal- and wind-driven circulation. Because the Bay is open to the northeast, winds from the northeast ('Northeasters') generate the largest surface waves and are thus the most effective in resuspending sediments. The three-dimensional oceanographic circulation model Regional Ocean Modeling System (ROMS) is used to explore the resuspension, transport, and deposition of sediment caused by Northeasters. The model transports multiple sediment classes and tracks the evolution of a multilevel sediment bed. The surficial sediment characteristics of the bed are coupled to one of several bottom-boundary layer modules that calculate enhanced bottom roughness due to wave-current interaction. The wave field is calculated from the model Simulating WAves Nearshore (SWAN). Two idealized simulations were carried out to explore the effects of Northeasters on the transport and fate of sediments. In one simulation, an initially spatially uniform bed of mixed sediments exposed to a series of Northeasters evolved to a pattern similar to the existing surficial sediment distribution. A second set of simulations explored sediment-transport pathways caused by storms with winds from the northeast quadrant by simulating release of sediment at selected locations. Storms with winds from the north cause transport southward along the western shore of Massachusetts Bay, while storms with winds from the east and southeast drive northerly nearshore flow. The simulations show that Northeasters can effectively transport sediments from Boston Harbor and the area offshore of the harbor to the southeast into Cape Cod Bay and offshore into Stellwagen Basin. This transport pattern is consistent with Boston Harbor as the source of silver found in the surficial sediments of Cape Cod Bay and

  14. The effect of climate change on electricity expenditures in Massachusetts

    International Nuclear Information System (INIS)

    Véliz, Karina D.; Kaufmann, Robert K.; Cleveland, Cutler J.; Stoner, Anne M.K.

    2017-01-01

    Climate change affects consumer expenditures by altering the consumption of and price for electricity. Previous analyses focus solely on the former, which implicitly assumes that climate-induced changes in consumption do not affect price. But this assumption is untenable because a shift in demand alters quantity and price at equilibrium. Here we present the first empirical estimates for the effect of climate change on electricity prices. Translated through the merit order dispatch of existing capacity for generating electricity, climate-induced changes in daily and monthly patterns of electricity consumption cause non-linear changes in electricity prices. A 2 °C increase in global mean temperature increases the prices for and consumption of electricity in Massachusetts USA, such that the average household’s annual expenditures on electricity increase by about 12%. Commercial customers incur a 9% increase. These increases are caused largely by higher prices for electricity, whose impacts on expenditures are 1.3 and 3.6 fold larger than changes in residential and commercial consumption, respectively. This suggests that previous empirical studies understate the effects of climate change on electricity expenditures and that policy may be needed to ensure that the market generates investments in peaking capacity to satisfy climate-driven changes in summer-time consumption. - Highlights: • Climate change increases summer peak of load curve in US state of Massachusetts. • Climate change increases electricity prices more than consumption. • Previous studies understate the effect of climate change on electricity expenditures. • Adaptation that reduces electricity demand may reduce the price effect. • Adaptation may raise prices by increasing capacity but lowering utilization rate.

  15. Nuclear installations: decommissioning and dismantling

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This document is a compilation of seven talks given during the 1995 EUROFORUM conference about decommissioning and dismantling of Nuclear installations in the European Community. The first two papers give a detailed description of the legal, financial and regulatory framework of decommissioning and dismantling of nuclear facilities in the European Union and a review of the currently available decommissioning techniques for inventory, disassembly, decontamination, remote operations and management of wastes. Other papers describe some legal and technical aspects of reactor and plants dismantling in UK, Germany, Spain and France. (J.S.)

  16. Helium transfer line installation details.

    CERN Multimedia

    G. Perinic

    2007-01-01

    A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with the hole in the rail support as well as the connection points at both ends required precise measurements of the given geometries as well as the installation of a temporary target for the verification of the theoretical predictions.

  17. Rehyd development and installation report

    International Nuclear Information System (INIS)

    Schuch, R.L.; Woodall, H.N.

    1977-12-01

    Rehyd, a low-impedance, HYDRA-type, water transmission line for bremsstrahlung exposures, was installed on the north side of the REBA facility. Rehyd produces 300 kA beams of 1.2 MeV electrons with a pulse width of 170 ns. Nominal x-ray exposure dose capabilities of 7 cal/g and 20 to 25 kJ were realized thus far. A description is given of the specific design parameters and facility layouts including the unique features of the REBA Marx generator/Rehyd line energy-transfer system. Diode configurations, magnetic-field applications, and output measurements are also presented

  18. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  19. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  20. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  1. Massachusetts State Briefing Book for low-level radioactive waste management

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-12

    The Massachusetts State Briefing Book is one of a series of State briefing books on low-level radioactive waste management practices. It has been prepared to assist State and Federal agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Massachusetts. The profile is the result of a survey of NRC licensees in Massachusetts. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may impact waste management practices in Massachusetts.

  2. Massachusetts Division of Marine Fisheries SED Dataset 2_17_11

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This GIS data layer represents point coverage of seafloor sediment size and composition in Massachusetts territorial waters. The data were created by aggregating...

  3. Massachusetts State Briefing Book for low-level radioactive waste management

    International Nuclear Information System (INIS)

    1981-01-01

    The Massachusetts State Briefing Book is one of a series of State briefing books on low-level radioactive waste management practices. It has been prepared to assist State and Federal agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Massachusetts. The profile is the result of a survey of NRC licensees in Massachusetts. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may impact waste management practices in Massachusetts

  4. Intermediate photovoltaic system application experiment operational performance report, for Beverly High School, Beverly, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    1982-07-01

    The data accumulated during April 1982 at the photovoltaic project site at the Beverly High School, Beverly Massachusetts, are presented. Generated power and environmental (weather) data are presented graphically. Explanations of irregularities not attributable to weather are provided.

  5. Intermediate photovoltaic system application experiment operational performance. Executive summary for Beverly High School, Beverly, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    1982-07-01

    Presented are the data accumulated during April 1982 at the photovoltaic project site at the Beverly High School, Beverly, Massachusetts. Generated power and environmental (weather) data are presented graphically. Explanations of irregularities not attributable to weather are provided.

  6. General Education in the University of Massachusetts Amherst: A New Rationale.

    Science.gov (United States)

    Jenkins, John A.

    2002-01-01

    Describes the University of Massachusetts Amherst's commitment to and program of general education for undergraduates, asserting that a curriculum balanced between professional specialization and general education provides the most practical education for a life of visionary leadership. (EV)

  7. Social Vulnerability Index (SoVI) for Massachusetts based on 2000 Census Block Groups

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data depicts the social vulnerability of Massachusetts census block groups to environmental hazards. Data were culled primarily from the 2000 Decennial Census.

  8. 77 FR 36404 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Determination of...

    Science.gov (United States)

    2012-06-19

    ... accessible until early May in both 2010 and 2011, due to snow and ice. The Massachusetts Department of...)(2).) List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  9. MODELING HOW A HURRICANE BARRIER IN NEW BEDFORD HARBOR, MASSACHUSETTS, AFFECTS THE HYDRODYNAMICS AND RESIDENCE TIMES

    Science.gov (United States)

    Two-dimensional hydrodynamic and transport models were used to simulate tidal and subtidal circulation, residence times, and the longitudinal distributions of conservative constituents in New Bedford Harbor, Massachusetts, before and after a hurricane barrier was constructed. The...

  10. Field Monitoring of Experimental Hot Mix Asphalt Projects Placed in Massachusetts

    Science.gov (United States)

    2017-06-30

    Since 2000, Massachusetts has been involved with numerous field trials of experimental hot mix asphalt mixtures. These experimental mixtures included several pilot projects using the Superpave mixture design methodology, utilization of warm mix aspha...

  11. Environmental Assessment of Lead at Camp Edwards, Massachusetts, Small Arms Ranges

    National Research Council Canada - National Science Library

    Clausen, Jay L; Korte, Nic; Bostick, Benjamin; Rice, Benjamin; Walsh, Matthew; Nelson, Andrew

    2007-01-01

    Environmental issues for small arms training with lead projectiles are examined in this report for Camp Edwards, Massachusetts, in order to evaluate whether past or future use of lead in small arms...

  12. The Effect of Massachusetts' Health Reform on Employer-Sponsored Insurance Premiums.

    Science.gov (United States)

    Cogan, John F; Hubbard, R Glenn; Kessler, Daniel

    2010-01-01

    In this paper, we use publicly available data from the Medical Expenditure Panel Survey - Insurance Component (MEPS-IC) to investigate the effect of Massachusetts' health reform plan on employer-sponsored insurance premiums. We tabulate premium growth for private-sector employers in Massachusetts and the United States as a whole for 2004 - 2008. We estimate the effect of the plan as the difference in premium growth between Massachusetts and the United States between 2006 and 2008-that is, before versus after the plan-over and above the difference in premium growth for 2004 to 2006. We find that health reform in Massachusetts increased single-coverage employer-sponsored insurance premiums by about 6 percent, or $262. Although our research design has important limitations, it does suggest that policy makers should be concerned about the consequences of health reform for the cost of private insurance.

  13. 2012 FEMA Topographic Lidar: Hudson-Hoosic and Deerfield Watersheds, Massachusetts

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Light Detection and Ranging (LiDAR) dataset is a survey of the Hudson-Hoosic and Deerfield project area. The entire survey area for Massachusetts is...

  14. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  15. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  16. Effects of water-supply reservoirs on streamflow in Massachusetts

    Science.gov (United States)

    Levin, Sara B.

    2016-10-06

    State and local water-resource managers need modeling tools to help them manage and protect water-supply resources for both human consumption and ecological needs. The U.S. Geological Survey, in cooperation with the Massachusetts Department of Environmental Protection, has developed a decision-support tool to estimate the effects of reservoirs on natural streamflow. The Massachusetts Reservoir Simulation Tool is a model that simulates the daily water balance of a reservoir. The reservoir simulation tool provides estimates of daily outflows from reservoirs and compares the frequency, duration, and magnitude of the volume of outflows from reservoirs with estimates of the unaltered streamflow that would occur if no dam were present. This tool will help environmental managers understand the complex interactions and tradeoffs between water withdrawals, reservoir operational practices, and reservoir outflows needed for aquatic habitats.A sensitivity analysis of the daily water balance equation was performed to identify physical and operational features of reservoirs that could have the greatest effect on reservoir outflows. For the purpose of this report, uncontrolled releases of water (spills or spillage) over the reservoir spillway were considered to be a proxy for reservoir outflows directly below the dam. The ratio of average withdrawals to the average inflows had the largest effect on spillage patterns, with the highest withdrawals leading to the lowest spillage. The size of the surface area relative to the drainage area of the reservoir also had an effect on spillage; reservoirs with large surface areas have high evaporation rates during the summer, which can contribute to frequent and long periods without spillage, even in the absence of water withdrawals. Other reservoir characteristics, such as variability of inflows, groundwater interactions, and seasonal demand patterns, had low to moderate effects on the frequency, duration, and magnitude of spillage. The

  17. Availability and range of tobacco products for sale in Massachusetts pharmacies.

    Science.gov (United States)

    Seidenberg, Andrew B; Hong, Weiwei; Liu, Jiayue; Noel, Jonathan K; Rees, Vaughan W

    2013-11-01

    New tobacco control policies have been introduced in Massachusetts which restrict tobacco product sales in pharmacies. The purpose of this investigation was to outline the scope of pharmacy involvement in the tobacco market by assessing the availability and range of tobacco products sold in Massachusetts pharmacies. Public listings of licenced pharmacies and tobacco retailers in Massachusetts were examined to determine the proportion of pharmacies licenced to sell tobacco, and the proportion of tobacco retailers possessing a pharmacy licence. Telephone interviews were conducted with a random sample (n=70) of pharmacies possessing a tobacco licence to assess the availability and range of tobacco products for sale. The availability of nicotine replacement therapy (NRT) products was assessed as a comparison. The majority of pharmacies in Massachusetts possessed a tobacco licence (69%), and pharmacies made up 9% of licenced tobacco retailers. Among pharmacies surveyed that reported selling tobacco (90%), cigarettes were the most available tobacco product for sale (100%), followed by cigars (69%), little cigars/cigarillos (66%), moist snuff (53%), pipe tobacco (49%), roll-your-own tobacco (34%), snus (14%), dissolvable tobacco (11%) and electronic cigarettes (2%). Nearly all pharmacies selling tobacco offered the nicotine patch (100%), gum (100%) and lozenge (98%). Tobacco-free pharmacy policies would affect a majority of Massachusetts pharmacies and remove a variety of tobacco products from their store shelves. Further, nearly one in ten tobacco retailers would be eliminated by prohibiting tobacco sales in Massachusetts pharmacies statewide.

  18. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  19. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  20. Sediment quality in the north coastal basin of Massachusetts, 2003

    Science.gov (United States)

    Breault, Robert F.; Ashman, Mary S.; Heath, Douglas

    2004-01-01

    The U.S. Geological Survey, in cooperation with the Massachusetts Department of Environmental Protection, completed a reconnaissance-level study of bottom-sediment quality in selected lakes, rivers, and estuaries in the North Coastal Basin of Massachusetts. Bottom-sediment grab samples were collected from 20 sites in the North River, Lake Quannapowitt, Saugus River, Mill River, Shute Brook, Sea Plane Basin, Pines River, and Bear Creek. The samples were tested for various types of potentially harmful contaminants? including 33 elements, 17 polyaromatic hydrocarbons (PAHs), 22 organochlorine pesticides, and 7 polychlorinated biphenyl (PCB) mixtures (Aroclors)?to benthic organisms (bottom-dwelling) and humans. The results were compared among sampling sites, to background concentrations, and to concen-trations measured in other urban rivers, and sediment-quality guidelines were used to predict toxicity at the sampling sites to benthic organisms and humans. Because there are no standards for human toxicity for aquatic sediment, standards for contaminated upland soil were used. Contaminant concentrations measured in sediment collected from the North Coastal Basin generally were equal to or greater than concentrations in sediment from uncontaminated rivers throughout New England. Contaminants in North Coastal Basin sediment with elevated concentrations (above back-ground levels) included arsenic, chromium, copper, lead, nickel, and zinc, some of the PAHs, dichlorodiphenyltrichloro-ethane (DDT) and its metabolites, and dieldrin. No PCBs were measured above the detection limits. Measured concentrations of arsenic, chromium, and lead were also generally greater than those measured in other urban rivers throughout the conter-minous United States. With one exception (arsenic), local con-centrations measured in sediment samples collected from the North Coastal Basin were lower than concentrations measured in sediment collected from two of three urban rivers draining to Boston

  1. Wind profiler installed in Antarctica

    Science.gov (United States)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  2. NEMP effects on domestic installation

    International Nuclear Information System (INIS)

    Braun, C.; Clemens, P.; Graf, W.; Guidi, P.; Schmidt, H.U.

    1985-01-01

    The measurements have been made in a building of a psychiatric clinic at Alzey/West Germany. The building has been chosen for the measuring campaign because it has its own electrical installation for mains current supply and emergency power supply, apart from systems of the other buildings. The two supply systems DONNERSBERG could be cut off completely from the other mains systems, so that coupling and feed experiments could be made without mains voltage. Current supply to the measuring systems was done by means of extension cables, or by batteries. The wiring for connection to the room circuits is parallel to the exterior wall, so that measurements could be done by using a frame antenna placed outside of the building parallel to the exterior wall. (orig./DG) [de

  3. Quality of stormwater runoff discharged from Massachusetts highways, 2005-07

    Science.gov (United States)

    Smith, Kirk P.; Granato, Gregory E.

    2010-01-01

    The U.S. Geological Survey (USGS), in cooperation with U.S. Department of Transportation Federal Highway Administration and the Massachusetts Department of Transportation, conducted a field study from September 2005 through September 2007 to characterize the quality of highway runoff for a wide range of constituents. The highways studied had annual average daily traffic (AADT) volumes from about 3,000 to more than 190,000 vehicles per day. Highway-monitoring stations were installed at 12 locations in Massachusetts on 8 highways. The 12 monitoring stations were subdivided into 4 primary, 4 secondary, and 4 test stations. Each site contained a 100-percent impervious drainage area that included two or more catch basins sharing a common outflow pipe. Paired primary and secondary stations were located within a few miles of each other on a limited-access section of the same highway. Most of the data were collected at the primary and secondary stations, which were located on four principal highways (Route 119, Route 2, Interstate 495, and Interstate 95). The secondary stations were operated simultaneously with the primary stations for at least a year. Data from the four test stations (Route 8, Interstate 195, Interstate 190, and Interstate 93) were used to determine the transferability of the data collected from the principal highways to other highways characterized by different construction techniques, land use, and geography. Automatic-monitoring techniques were used to collect composite samples of highway runoff and make continuous measurements of several physical characteristics. Flowweighted samples of highway runoff were collected automatically during approximately 140 rain and mixed rain, sleet, and snowstorms. These samples were analyzed for physical characteristics and concentrations of 6 dissolved major ions, total nutrients, 8 total-recoverable metals, suspended sediment, and 85 semivolatile organic compounds (SVOCs), which include priority polyaromatic

  4. Characterization of stormwater runoff from bridge decks in eastern Massachusetts, 2014–16

    Science.gov (United States)

    Smith, Kirk P.; Sorenson, Jason R.; Granato, Gregory E.

    2018-05-02

    The quality of stormwater runoff from bridge decks (hereafter referred to as “bridge-deck runoff”) was characterized in a field study from August 2014 through August 2016 in which concentrations of suspended sediment (SS) and total nutrients were monitored. These new data were collected to supplement existing highway-runoff data collected in Massachusetts which were deficient in bridge-deck runoff concentration data. Monitoring stations were installed at three bridges maintained by the Massachusetts Department of Transportation in eastern Massachusetts (State Route 2A in the city of Boston, Interstate 90 in the town of Weston, and State Route 20 near Quinsigamond Village in the city of Worcester). The bridges had annual average daily traffic volumes from 21,200 to 124,000 vehicles per day; the land use surrounding the monitoring stations was 25 to 67 percent impervious.Automatic-monitoring techniques were used to collect more than 160 flow-proportional composite samples of bridge-deck runoff. Samples were analyzed for concentrations of SS, loss on ignition of suspended solids (LOI), particulate carbon (PC), total phosphorus (TP), total dissolved nitrogen (DN), and particulate nitrogen (PN). The distribution of particle size of SS also was determined for composite samples. Samples of bridge-deck runoff were collected year round during rain, mixed precipitation, and snowmelt runoff and with different dry antecedent periods throughout the 2-year sampling period.At the three bridge-deck-monitoring stations, median concentrations of SS in composite samples of bridge-deck runoff ranged from 1,490 to 2,020 milligrams per liter (mg/L); however, the range of SS in individual composites was vast at 44 to 142,000 mg/L. Median concentrations of SS were similar in composite samples collected from the State Route 2A and Interstate 90 bridge (2,010 and 2,020 mg/L, respectively), and lowest at the State Route 20 bridge (1,490 mg/L). Concentrations of coarse sediment (greater

  5. Delineation of groundwater recharge areas, western Cape Cod, Massachusetts

    Science.gov (United States)

    Masterson, John P.; Walter, Donald A.

    2000-01-01

    The unconfined sand-and-gravel aquifer in western Cape Cod, Massachusetts, which is the sole source of water supply for the communities in the area, is recharged primarily from precipitation. The rate of recharge from precipitation is estimated to be about 26 inches per year (in/yr), or about 60 percent of the precipitation rate. This recharge rate yields a flow through the aquifer of about 180 million gallons per day (Mgal/d). Groundwater flows radially outward from the top of the water-table mound in the north-central part of the flow system toward the coast, as indicated by the water-table contours on the large map on this sheet. Recharge that reaches the water table near the top of the mound travels deeper through the aquifer than recharge that reaches the water table closer to the coast. All recharge to the aquifer ultimately discharges to pumping wells, streams, or coastal areas; however, some of this recharge may flow first through kettle ponds before eventually reaching these discharge points.

  6. Residential Greenness and Birthweight in the State of Massachusetts, USA

    Directory of Open Access Journals (Sweden)

    Kelvin C. Fong

    2018-06-01

    Full Text Available Natural vegetation, or greenness, may benefit maternal health and consequently, fetal growth, by providing opportunities for physical activity and psychological restoration, and decreasing detrimental environmental exposures. We retrieved Massachusetts Birth Registry data from 2001–2013 and investigated the association between residential greenness and birthweight in full-term births (≥37 weeks gestation. We calculated average residential greenness during pregnancy using 250 m normalized difference vegetation index (NDVI from satellites. We estimated associations between greenness and continuous birthweight, term low birthweight (TLBW: <2500 g, and small for gestational age (SGA: <10th percentile of birthweight stratified by sex and gestational age adjusted for individual and neighborhood covariates and considered nonlinearity and effect modification. Higher greenness exposure was associated with higher birthweight with stronger associations in the lower than higher range of greenness. Greenness was associated with lower odds of TLBW (OR 0.98; 95% CI 0.97, 0.99 per 0.1 increase in NDVI and SGA (OR 0.98; 95% 0.97, 0.99 and associations varied by population density (TLBW and socioeconomic status (TLBW, SGA. Our results suggest that greenness is beneficial to fetal growth exhibited by higher birthweight and lower odds of TLBW and SGA. Unlike prior studies, associations with TLBW and SGA appeared stronger among those with higher socioeconomic status.

  7. Evaluating OSHA's ethylene oxide standard: exposure determinants in Massachusetts hospitals.

    Science.gov (United States)

    LaMontagne, A D; Kelsey, K T

    2001-03-01

    This study sought to identify determinants of workplace exposures to ethylene oxide to assess the effect of the Occupational Safety and Health Administration's (OSHA's) 1984 ethylene oxide standard. An in-depth survey of all hospitals in Massachusetts that used ethylene oxide from 1990 through 1992 (96% participation, N = 90) was conducted. Three types of exposure events were modeled with logistic regression: exceeding the 8-hour action level, exceeding the 15-minute excursion limit, and worker exposures during unmeasured accidental releases. Covariates were drawn from data representing an ecologic framework including direct and indirect potential exposure determinants. After adjustment for frequencies of ethylene oxide use and exposure monitoring, a significant inverse relation was observed between exceeding the action level and the use of combined sterilizer-aerators, an engineering control technology developed after the passage of the OSHA standard. Conversely, the use of positive-pressure sterilizers that employ ethylene oxide gas mixtures was strongly related to both exceeding the excursion limit and the occurrence of accidental releases. These findings provide evidence of a positive effect of OSHA's ethylene oxide standard and specific targets for future prevention and control efforts.

  8. Massachusetts nuclear power referendum: Lessons learned from the campaign trail

    International Nuclear Information System (INIS)

    Allen, S.R.

    1989-01-01

    Last November, Massachusetts voters cast their ballots on a binding initiative which, if passed, would have prohibited the production of high-level waste, thereby permanently shutting down the state's two nuclear power plants: Yankee and Pilgrim. Question 4, as the initiative became known, posed an unprecedented challenge for the state's six major utilities. Essentially, Question 4 was defeated for two reasons: compelling arguments and a well-founded strategy for communicating those arguments. One part of that strategy was the use of debates and public-speaking engagements before both civic groups and on radio/television. These debates and presentations were clearly the most interesting part of the campaign and provided many insights that may be applied to long-term public policy and informational programs. Obviously, there is a significant difference between an intense, focused campaign and an ongoing, diverse public information program-but many of the principles are the same. The purpose of this paper is to review some of the key lessons learned from over 300 debates and presentations in the highly emotional atmosphere of the Question 4 campaign. Throughout the campaign, debaters and speakers submitted after action reports, and it is from these as well as the overall campaign results that the lessons and anecdotes are derived

  9. Water resources in the Blackstone River basin, Massachusetts

    Science.gov (United States)

    Walker, Eugene H.; Krejmas, Bruce E.

    1983-01-01

    The Blackstone River heads in brooks 6 miles northwest of Worcester and drains about 330 square miles of central Massachusetts before crossing into Rhode Island at Woonsocket. The primary source of the Worcester water supply is reservoirs, but for the remaining 23 communities in the basin, the primary source is wells. Bedrock consists of granitic and metamorphic rocks. Till mantles the uplands and extends beneath stratified drift in the valleys. Stratified glacial drift, consisting of clay, silt, and fine sand deposited in lakes and coarse-textured sand and gravel deposited by streams, is found in lowlands and valleys. The bedrock aquifer is capable of sustaining rural domestic supplies throughout the Blackstone River basin. Bedrock wells yield an average of 10 gallons per minute, but some wells, especially those in lowlands where bedrock probably contains more fractures and receives more recharge than in the upland areas, yield as much as 100 gallons per minute. Glacial sand and gravel is the principal aquifer. It is capable of sustaining municipal supplies. Average daily pumpage from this aquifer in the Blackstone River basin was 10.4 million gallons per day in 1978. The median yield of large-diameter wells in the aquifer is 325 gallons per minute. The range of yields from these wells is 45 to 3,300 gallons per minute. The median specific capacity is about 30 gallons per minute per foot of drawdown.

  10. Effects of selected low-impact-development (LID) techniques on water quality and quantity in the Ipswich River Basin, Massachusetts-Field and modeling studies

    Science.gov (United States)

    Zimmerman, Marc J.; Barbaro, Jeffrey R.; Sorenson, Jason R.; Waldron, Marcus C.

    2010-01-01

    During the months of August and September, flows in the Ipswich River, Massachusetts, dramatically decrease largely due to groundwater withdrawals needed to meet increased residential and commercial water demands. In the summer, rates of groundwater recharge are lower than during the rest of the year, and water demands are higher. From 2005 to 2008, the U.S. Geological Survey, in a cooperative funding agreement with the Massachusetts Department of Conservation and Recreation, monitored small-scale installations of low-impact-development (LID) enhancements designed to diminish the effects of storm runoff on the quantity and quality of surface water and groundwater. Funding for the studies also was contributed by the U.S. Environmental Protection Agency's Targeted Watersheds Grant Program through a financial assistance agreement with Massachusetts Department of Conservation and Recreation. The monitoring studies examined the effects of (1) replacing an impervious parking lot surface with a porous surface on groundwater quality, (2) installing rain gardens and porous pavement in a neighborhood of 3 acres on the quantity and quality of stormwater runoff, and (3) installing a 3,000-square foot (ft2) green roof on the quantity and quality of stormwater runoff. In addition, the effects of broad-scale implementation of LID techniques, reduced water withdrawals, and water-conservation measures on streamflow in large areas of the basin were simulated using the U.S. Geological Survey's Ipswich River Basin model. From June 2005 to 2007, groundwater quality was monitored at the Silver Lake town beach parking lot in Wilmington, MA, prior to and following the replacement of the conventional, impervious-asphalt surface with a porous surface consisting primarily of porous asphalt and porous pavers. Changes in the concentrations of the water-quality constituents, phosphorus, nitrogen, cadmium, chromium, copper, lead, nickel, zinc, and total petroleum hydrocarbons, were monitored

  11. Massachusetts health reform and access for children with special health care needs.

    Science.gov (United States)

    Smith, Anna Jo; Chien, Alyna T

    2014-08-01

    Children with special health care needs (CSHCN) face unique challenges in accessing affordable health care. Massachusetts implemented major health reform in 2006; little is known about the impact of this state's health reform on uninsurance, access to care, and financial protection for privately and publicly insured CSHCN. We used a difference-in-differences (DD) approach to compare uninsurance, access to primary and specialty care, and financial protection in Massachusetts versus other states and Washington, DC before and after Massachusetts health reform. Parent-reported data were used from the 2005-2006 and 2009-2010 National Survey of Children with Special Health Care Needs and adjusted for age, gender, race/ethnicity, non-English language at home, and functional difficulties. Postreform, living in Massachusetts was not associated with significant decreases in uninsurance or increases in access to primary care for CSHCN. For privately insured CSHCN, Massachusetts was associated with increased access to specialists (DD = 6.0%; P ≤ .001) postreform. For publicly insured CSHCN, however, there was a significant decrease in access to prescription medications (DD = -7.2%; P = .003) postreform. Living in Massachusetts postreform was not associated with significant changes in financial protection compared with privately or publicly insured CSHCN in other states. Massachusetts health reform likely improved access to specialists for privately insured CSHCN but did not decrease instances of uninsurance, increase access to primary care, or improve financial protection for CSHCN in general. Comparable provisions within the Affordable Care Act may produce similarly modest outcomes for CSHCN. Copyright © 2014 by the American Academy of Pediatrics.

  12. Spectrometric assembly for portable installations

    International Nuclear Information System (INIS)

    Kluger, A.; Popescu, C.

    1997-01-01

    The components of the portable spectrometric assembly are: - the detecting probe with Na I(Tl) crystal and air-tight case of industrial type; - a microcomputer; - a unit of analogical processing of the signal from the detecting probe; - a single-channel analyzer with adjustable threshold; - commands and display module; - a source of high voltage; - an electrical supply battery. The device uses the method of gamma photons detection in energetic windows. Through theoretical and experimental studies carried out during the prototype development phase, the superiority of this method has been proved as compared with the installations which make use of the classical principle of photon integral detection. The achieved prototype has a basic program enabling the setting of all working parameters (measuring time, discriminating thresholds, discriminators operating conditions, etc.). Through the included interface RS232 it is possible to transmit the data to a more powerful computer in order to continually process the results. The spectrometric assembly, realized on the basis of micro-computers, can be used in a wide range of applications: measurement of thickness and erosion of walls and tubes, measurement of level in closed containers, of soil density, etc. The adjustment for specific application is performed only through a program modification. (authors)

  13. Installations having pressurised fluid circuits

    International Nuclear Information System (INIS)

    Rigg, S.; Grant, J.

    1977-01-01

    Reference is made to nuclear installations having pressurised coolant flow circuits. Breaches in such circuits may quickly result in much damage to the plant. Devices such as non-return valves, orifice plates, and automatically operated shut-off valves have been provided to prevent or reduce fluid flow through a breached pipe line, but such devices have several disadvantages; they may present large restrictions to normal flow of coolant, and may depend on the operation of ancillary equipment, with consequent delay in bringing them into operation in an emergency. Other expedients that have been adopted to prevent or reduce reverse flow through an upstream breach comprise various forms of hydraulic counter flow brakes. The arrangement described has at least one variable fluid brake comprising a fluidic device connected into a duct in the pressurised circuit, the device having an inlet, an outlet, a vortex chamber between the inlet and outlet, a control jet for introducing fluid into the vortex chamber, connections communicating the inlet and the outlet into one part of the circuit and the control jet into another region at a complementary pressure so that, in the event of a breach in the circuit in one region, fluid passes from the other region to enter the vortex chamber to stimulate pressure to create a flow restricting vortex in the chamber that reduces flow through the breach. The system finds particular application to stream generating pressure tube reactors, such as the steam generating heavy water reactor at UKAEA, Winfrith. (U.K.)

  14. ALARA in European nuclear installations

    International Nuclear Information System (INIS)

    Lefaure, C.; Croft, J.; Pfeffer, W.; Zeevaert, T.

    1995-01-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe

  15. ALARA in European nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Lefaure, C. [CEPN, Fontenay-Aux-Roses (France); Croft, J. [NRPB, Chilton, Didcot (United Kingdom); Pfeffer, W. [GRS, Koeln (Germany); Zeevaert, T. [SCK/CEN, Mol (Belgium)

    1995-03-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe.

  16. ID Barrel installed in cryostat

    CERN Multimedia

    Apsimon, R.; Romaniouk, A.

    Wednesday 23rd August was a memorable day for the Inner Detector community as they witnessed the transport and installation of the central part of the inner detector (ID-barrel) into the ATLAS detector. Many members of the collaboration gathered to witness this moment at Point 1. After years of design, construction and commissioning, the outer two detectors (TRT and SCT) of the ID barrel were moved from the SR1 cleanroom to the ATLAS cavern. The barrel was moved across the car park from building 2175 to SX1. Although only a journey of about 100 metres, this required weeks of planning and some degree of luck as far as the weather was concerned. Accelerometers were fitted to the barrel to provide real-time monitoring and no values greater than 0.1 g were recorded, fully satisfying the transport specification for this extremely precise and fragile detector. Muriel, despite her fear of heights, bravely volunteered to keep a close eye on the detector. Swapping cranes to cross the entire parking lot, while Mur...

  17. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  18. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  19. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  20. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  1. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  2. Walden Pond, Massachusetts: Environmental Setting and Current Investigations

    Science.gov (United States)

    Colman, John A.; Waldron, Marcus C.

    1998-01-01

    Introduction Walden Pond, in Concord, Massachusetts, is famous among lakes because of its unique social history. Walden was the setting for American naturalist Henry David Thoreau's well-known essay 'Walden; or, Life in the Woods,' first published in 1854. Thoreau lived and wrote at Walden Pond from July 1845 to September 1847. In 'Walden,' Thoreau combined highly admired writing on Transcendental philosophy with pioneering observations of aquatic ecology and physical aspects of limnology, the study of lakes. Because Thoreau also defended so effectively the value of living close to nature in the Walden woods, the pond is considered by many to be the birthplace of the American conservation movement. Visitors come from all over the world to the pond, which has been designated a National Historic Landmark, and its fame has resulted in a major fund drive to preserve the surrounding woods. Walden Pond has no surfacewater inflow or outflow, and much of its ground-water contributing area likely is preserved within the Walden Pond Reservation area (fig. 1). Only 15 miles from Boston, the pond is unusually clear and pristine for an urban-area lake. However, point sources of nutrients near the pond, and a large annual visitor attendance, concentrated during the summer when the swimming beach (fig. 2) is open, may contribute a nutrient load sufficient to change the pond environment. The occurrence of nuisance algal species, a recent beach closing, and an awareness of water-quality problems suffered by other ponds in the region raise concerns about the risk of ecological change at Walden Pond. Despite the role of Walden Pond as a cultural and environmental icon, little is known about the pond's ecological features, such as its internal nutrient cycling or the structure of its food web, nor have consistent measurements been made to determine whether these features are changing or are stable. Production rates of aquatic plants in lakes and ponds naturally undergo a slow increase

  3. Movement patterns of rural and suburban white-tailed deer in Massachusetts

    Science.gov (United States)

    Gaughan, C.R.; DeStefano, S.

    2005-01-01

    We used satellite land cover data and the program FRAGSTATS toquantify land cover types and calculate the amount of forest edge available in suburban and rural regions of northeastern and northwestern Massachusetts. Cover categories included forest cover, open canopy vegetation, and non-deer habitat. We calculated all edge segments where forest cover abutted open canopy cover. Our open canopy vegetation category was calculated both with and without low intensity suburban development. We then compared these findings to movement data from 53 (13 males, 40 females) adult radio-marked white-tailed deerOdocoileus virginianusmonitored biweekly and diurnally from January 2001 to January 2003. The range of movements of suburban deer in eastern Massachusetts showed no difference to that of suburban deer in western Massachusetts (P = 0.7). However, the ranges for suburban deer in both eastern and western Massachusetts were 10 times less than those of deer in rural western Massachusetts (P = 0.001).Our findings suggest that landscape configuration, as described by the amount and distribution of edge due to suburban development, which is related to the amount and distribution of resources such as food and cover, affects migratory behavior of white-tailed deer, allowsdeer to have smaller ranges, and contributes to high deer densities.Inclusion of suburban edge in habitat models will increase our understanding of deer-habitat relationships for management of deer in urbanizing environments. ?? 2005 Springer Science + Business Media, Inc.

  4. Environmental and economic evaluation of the Massachusetts Smoke-Free Workplace Law.

    Science.gov (United States)

    Alpert, Hillel R; Carpenter, Carrie M; Travers, Mark J; Connolly, Gregory N

    2007-08-01

    An environmental and economic evaluation of the smoke-free law in Massachusetts provides a broad appreciation of how a state-wide smoking ban affects the health of patrons and workers as well as the industries that are commonly concerned about the effects of smoking bans on business. The aim of this study is to evaluate environmental and economic effects of the statewide Massachusetts statewide Smoke-Free Workplace Law. Before and after the smoking ban, air quality testing was conducted in a sample (n = 27) of hospitality venues and state-wide economic changes were assessed. Compliance, in terms of patronage was measured by person-counts. Environmental outcomes were respirable suspended particles (RSP) less than 2.5 microns in diameter (PM2.5). Economic outcomes were meals tax collections, employment in the food services and drinking places and accommodations industries. On average, levels of respirable suspended particles (RSPs) less than 2.5 microns in diameter (PM2.5) decreased 93% in these venues after the Massachusetts Smoke-free Workplace Law went into effect. No statistically significant changes were observed among the economic indicators. This evaluation demonstrates that the state-wide Massachusetts law has effectively improved indoor air quality in a sample of Massachusetts venues and has not negatively affected several economic indicators.

  5. Overview of causes and costs of injuries in Massachusetts: a methodology for analysis of state data.

    Science.gov (United States)

    Schuster, M; Cohen, B B; Rodgers, C G; Walker, D K; Friedman, D J; Ozonoff, V V

    1995-01-01

    Massachusetts has developed the first State profile of the causes and costs of injury based on the national study, "Cost of Injury in the United States: A Report to Congress." Incidence of fatal injuries is based on Massachusetts data; nonfatal hospitalized injuries, on Massachusetts age and sex rates and U.S. cause data; and nonhospitalized injuries, on U.S. rates applied to Massachusetts census data. Lifetime costs per injured person are based on national data adjusted for higher personal health care expenditures and for higher mean annual earnings in Massachusetts. The estimated total lifetime cost for the 1.4 million injuries that occurred in 1989 is $4.4 billion--$1.7 billion for health care and $2.7 billion for lost earnings. Injuries attributed to motor vehicles and falls account for more than half of the total cost. The other cause categories are poisonings, fire-burns, firearms, drowings-near drownings, and other. For every person who dies from an injury, 17 people are hospitalized, and an estimated 535 people require outpatient treatment, consultation, or restricted activity. Development of a State-based cost report can be useful in monitoring the contribution of injuries to health status and in planning effective injury prevention strategies in a community-based health care system. The methodology described in this paper can be replicated by other States through accessing their State-specific mortality and hospital discharge data bases. PMID:7610211

  6. Remediation of the Wells G & H Superfund Site, Woburn, Massachusetts.

    Science.gov (United States)

    Bair, E Scott; Metheny, Maura A

    2002-01-01

    Remediation of ground water and soil contamination at the Wells G & H Superfund Site, Woburn, Massachusetts, uses technologies that reflect differences in hydrogeologic settings, concentrations of volatile organic compounds (VOCs), and costs of treatment. The poorly permeable glacial materials that overlie fractured bedrock at the W.R. Grace property necessitate use of closely spaced recovery wells. Contaminated ground water is treated with hydrogen peroxide and ultraviolet (UV) oxidation. At UniFirst, a deep well completed in fractured bedrock removes contaminated ground water, which is treated by hydrogen peroxide, UV oxidation, and granular activated carbon (GAC). The remediation system at Wildwood integrates air sparging, soil-vapor extraction, and ground water pumping. Air stripping and GAC are used to treat contaminated water; GAC is used to treat contaminated air. New England Plastics (NEP) uses air sparging and soil-vapor extraction to remove VOCs from the unsaturated zone and shallow ground water. Contaminated air and water are treated using separate GAC systems. After nine years of operation at W.R. Grace and UniFirst, 30 and 786 kg, respectively, of VOCs have been removed. In three years of operation, 866 kg of VOCs have been removed at Wildwood. In 15 months of operation, 36 kg of VOCs were removed at NEP. Characterization work continues at the Olympia Nominee Trust, Whitney Barrel, Murphy Waste Oil, and Aberjona Auto Parts properties. Risk assessments are being finalized that address heavy metals in the floodplain sediments along the Aberjona River that are mobilized from the Industri-Plex Superfund Site located a few miles upstream.

  7. Evolution of the Whipple procedure at the Massachusetts General Hospital.

    Science.gov (United States)

    Fernández-del Castillo, Carlos; Morales-Oyarvide, Vicente; McGrath, Deborah; Wargo, Jennifer A; Ferrone, Cristina R; Thayer, Sarah P; Lillemoe, Keith D; Warshaw, Andrew L

    2012-09-01

    Since Allen O. Whipple published his seminal paper in 1935, the procedure that bears his name has been performed widely throughout the world and is now a common operation in major medical centers. The goal of this study was to investigate the evolution of pancreatoduodenectomy at the Massachusetts General Hospital (MGH). We sought to identify all pancreatoduodenectomies performed at the MGH since 1935. Cases were obtained from a computerized database, hospital medical records, and the MGH historical archive. Demographics, diagnosis, intraoperative variables and short-term surgical outcomes were recorded. The first pancreatoduodenectomy at the MGH was carried out in 1941; since then, 2,050 Whipple procedures have been performed. Pancreatic ductal adenocarcinoma was the most frequent indication (36%). Pylorus preservation has been the most important variation in technique, accounting for 45% of Whipple procedures in the 1980s; observation of frequent delayed gastric emptying after this procedure led to decline in its use. Pancreatic fistula was the most frequent complication (13%). Operative blood replacement and reoperation rates have decreased markedly over time; the most frequent indication for reoperation was intra-abdominal bleeding. Mortality has decreased from 45% to 0.8%, with sepsis and hypovolemic shock being the most frequent causes of death. Mean duration of hospital stay has decreased from >30 to 9.5 days, along with an increasing readmission rate (currently 19%). The Whipple procedure in the 21st century is a well-established operation. Improvements in operative technique and perioperative care have contributed in making it a safe operation that continues evolving. Copyright © 2012 Mosby, Inc. All rights reserved.

  8. Methods for estimating low-flow statistics for Massachusetts streams

    Science.gov (United States)

    Ries, Kernell G.; Friesz, Paul J.

    2000-01-01

    Methods and computer software are described in this report for determining flow duration, low-flow frequency statistics, and August median flows. These low-flow statistics can be estimated for unregulated streams in Massachusetts using different methods depending on whether the location of interest is at a streamgaging station, a low-flow partial-record station, or an ungaged site where no data are available. Low-flow statistics for streamgaging stations can be estimated using standard U.S. Geological Survey methods described in the report. The MOVE.1 mathematical method and a graphical correlation method can be used to estimate low-flow statistics for low-flow partial-record stations. The MOVE.1 method is recommended when the relation between measured flows at a partial-record station and daily mean flows at a nearby, hydrologically similar streamgaging station is linear, and the graphical method is recommended when the relation is curved. Equations are presented for computing the variance and equivalent years of record for estimates of low-flow statistics for low-flow partial-record stations when either a single or multiple index stations are used to determine the estimates. The drainage-area ratio method or regression equations can be used to estimate low-flow statistics for ungaged sites where no data are available. The drainage-area ratio method is generally as accurate as or more accurate than regression estimates when the drainage-area ratio for an ungaged site is between 0.3 and 1.5 times the drainage area of the index data-collection site. Regression equations were developed to estimate the natural, long-term 99-, 98-, 95-, 90-, 85-, 80-, 75-, 70-, 60-, and 50-percent duration flows; the 7-day, 2-year and the 7-day, 10-year low flows; and the August median flow for ungaged sites in Massachusetts. Streamflow statistics and basin characteristics for 87 to 133 streamgaging stations and low-flow partial-record stations were used to develop the equations. The

  9. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...

  10. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  11. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  12. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  13. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  14. Using game engines in mixed reality installations

    NARCIS (Netherlands)

    Nakevska, M.; Vos, E.C.; Juarez, Alex; Hu, J.; Langereis, G.R.; Rauterberg, G.W.M.; Anacleto, J.; Fels, S.; Graham, N.; et al., xx

    2011-01-01

    In a mixed reality installation, a variety of technologies is integrated such as virtual reality, augmented reality, and animated virtual agents and robotic agents. One of the main challenges is how to design and implement a mixed reality installation that integrates a heterogeneous array of sensors

  15. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  16. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  17. Public perception of nuclear installations

    International Nuclear Information System (INIS)

    Kiipper, Felipe de Moura

    2011-01-01

    The key for nuclear renaissance is public acceptance. Facing energetic needs that occur around the world and lack of resources, the work of characterizing and proposing new models to represent public opinion is extremely important to all stakeholders. Even though public opinion's study on risks is relatively recent, may approaches of this subject have been suggested and presented, especially for the topic of perceptions on nuclear installations. Actual definitions on risk exist between objective and subjective models, that reflect opinions of lay public and experts. Strategies on communications with the public may be evaluated from many developed models, and its results may be registered. The use of structural models may present an exploratory character as well as confirmatory theories, as an adequate tool for the development of studies on public perception. In this work, a structural model is presented from data obtained in a previous report, and added to data collected before and after the Fukushima nuclear accident, in Japan. The effects developed from this accident offered a unique opportunity to study public opinion through the effects of a serious nuclear accident and its effects on risk communications. Aside, this work attempted to check the structural model according with obtained results, in order to sustain a constant improvement of the working tools. Yet, a comparison between data according to experts' respondents and lay public ones as well as a comparison among different students before and after a visit to nuclear station is considered. Obtained data for the structural models has been applied for on a structural model and analyzed by structural correlation matrix, latent variable structural coefficients and R 2 values. Results indicate that public opinion maintains its rejection on nuclear energy and the perception of benefits, facing perceived risks before the accident, has diminished. A new model that included a latent variable for corresponding

  18. Support for smoke-free restaurants among Massachusetts adults, 1992-1999.

    Science.gov (United States)

    Brooks, D R; Mucci, L A

    2001-02-01

    The authors examined trends and predictors of public support for smoke-free restaurants in Massachusetts. Since 1992, the Massachusetts Behavioral Risk Factor Surveillance System has asked survey respondents about their attitudes toward smoking in restaurants. Analyses using data from 1992 to 1999 characterized changes over time in support for smoke-free restaurants and the role of demographic and smoking-related factors in predicting support. During 1992 to 1999, the rate of support for smoke-free restaurants increased from 37.5% to 59.8%, with similar increases among current, former, and never smokers. After adjustment for smoking status, support was associated with socioeconomic characteristics, race/ethnicity, and household smoking rules. Among current smokers, lighter smokers and those who were trying to quit were more likely to endorse smoke-free restaurants. There has been a substantial increase in support for smoke-free restaurants among both smokers and nonsmokers in Massachusetts.

  19. Geophysical and sampling data from the inner continental shelf: Duxbury to Hull, Massachusetts

    Science.gov (United States)

    Barnhardt, Walter A.; Ackerman, Seth D.; Andrews, Brian D.; Baldwin, Wayne E.

    2010-01-01

    The U.S. Geological Survey (USGS) and the Massachusetts Office of Coastal Zone Management (CZM) have cooperated to map approximately 200 km² of the Massachusetts inner continental shelf between Duxbury and Hull. This report contains geophysical and geological data collected by the USGS on three cruises between 2006 and 2007. These USGS data are supplemented with a National Oceanic and Atmospheric Administration (NOAA) hydrographic survey conducted in 2003 to update navigation charts. The geophysical data include (1) swath bathymetry from interferometric sonar and multibeam echosounders, (2) acoustic backscatter from sidescan sonar and multibeam echosounders, and (3) subsurface stratigraphy and structure from seismic-reflection profilers. The geological data include sediment samples, seafloor photographs, and bottom videos. These spatial data support research on the influence sea-level change and sediment supply have on coastal evolution, and on efforts to understand the type, distribution, and quality of subtidal marine habitats in the Massachusetts coastal ocean.

  20. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  1. Effects of low-impact-development (LID) practices on streamflow, runoff quantity, and runoff quality in the Ipswich River Basin, Massachusetts-A Summary of field and modeling studies

    Science.gov (United States)

    Zimmerman, Marc J.; Waldron, Marcus C.; Barbaro, Jeffrey R.; Sorenson, Jason R.

    2010-01-01

    Low-impact-development (LID) approaches are intended to create, retain, or restore natural hydrologic and water-quality conditions that may be affected by human alterations. Wide-scale implementation of LID techniques may offer the possibility of improving conditions in river basins, such as the Ipswich River Basin in Massachusetts, that have run dry during the summer because of groundwater withdrawals and drought. From 2005 to 2008, the U.S. Geological Survey, in a cooperative funding agreement with the Massachusetts Department of Conservation and Recreation, monitored small-scale installations of LID enhancements designed to diminish the effects of storm runoff on the quantity and quality of surface water and groundwater. Funding for the studies also was contributed by the U.S. Environmental Protection Agency's Targeted Watersheds Grant Program through a financial assistance agreement with Massachusetts Department of Conservation and Recreation. The monitoring studies examined the effects of * replacing an impervious parking-lot surface with a porous surface on groundwater quality, * installing rain gardens and porous pavement in a neighborhood of 3 acres on the quantity and quality of stormwater runoff, and * installing a 3,000-ft2 (square-foot) green roof on the quantity and quality of rainfall-generated roof runoff. In addition to these small-scale installations, the U.S. Geological Survey's Ipswich River Basin model was used to simulate the basin-wide effects on streamflow of several changes: broad-scale implementation of LID techniques, reduced water-supply withdrawals, and water-conservation measures. Water-supply and conservation scenarios for application in model simulations were developed with the assistance of two technical advisory committees that included representatives of State agencies responsible for water resources, the U.S. Environmental Protection Agency, the U.S. Geological Survey, water suppliers, and non-governmental organizations. From June

  2. Rates of Femicide in Women of Different Races, Ethnicities, and Places of Birth: Massachusetts, 1993-2007

    Science.gov (United States)

    Azziz-Baumgartner, Eduardo; McKeown, Loreta; Melvin, Patrice; Dang, Quynh; Reed, Joan

    2011-01-01

    To describe the epidemiology of intimate partner violence (IPV) homicide in Massachusetts, an IPV mortality data set developed by the Massachusetts Department of Public Health was analyzed. The rates of death were estimated by dividing the number of decedents over the aged-matched population and Poisson regression was used to estimate the…

  3. Community health centers' impact on the political and economic environment: the Massachusetts example.

    Science.gov (United States)

    Hunt, James W

    2005-01-01

    Since their inception in 1965, community health centers have thrived against tough odds, including patchwork funding, an unpredictable public policy environment, and a volatile healthcare marketplace. Much of this long-term success has been attributed to the centers' ability to affect their economic and political environment. Massachusetts provides an excellent example of this outward orientation. It was here that the centers first took hold, grew rapidly as a result of grassroots activity, and came together as a group for advocacy and mutual assistance. This article examines the Massachusetts experience in light of the health centers' ability to survive and grow.

  4. A Qualitative Examination of the Psychosocial Adjustment of Khmer Refugees in Three Massachusetts Communities

    Directory of Open Access Journals (Sweden)

    Leakhena Nou

    2006-01-01

    Full Text Available This paper uses a sociological stress process model to explore the Khmer adult refugees' experience in Massachusetts. The analysis is based on the responses of three focus groups in the Khmer communities of Lowell, Lynn, and Revere, Massachusetts. The focus groups provided an in-depth understanding of sources of stress, stress mediators, and psychosocial adjustment/adaptational patterns for Khmer refugees who had experienced the Cambodian genocide. Symptoms and reactions associated with underlying causes of mental health problems had culturally specific relevance to physical illness and mental health.

  5. A Qualitative Examination of the Psychosocial Adjustment of Khmer Refugees in Three Massachusetts Communities

    Directory of Open Access Journals (Sweden)

    Leakhena Nou

    2006-10-01

    Full Text Available This paper uses a sociological stress process model to explore the Khmer adult refugees' experience in Massachusetts. The analysis is based on the responses of three focus groups in the Khmer communities of Lowell, Lynn, and Revere, Massachusetts. The focus groups provided an in-depth understanding of sources of stress, stress mediators, and psychosocial adjustment/adaptational patterns for Khmer refugees who had experienced the Cambodian genocide. Symptoms and reactions associated with underlying causes of mental health problems had culturally specific relevance to physical illness and mental health.

  6. Workshop on nuclear technology: A joint effort between ANS and the University of Massachusetts-Lowell

    International Nuclear Information System (INIS)

    Brown, G.J.; McDevitt, M.A.; Schmidt, D.

    1992-01-01

    The University of Massachusetts Lowell (UML) (formerly University of Lowell) sponsored, along with the American Nuclear Society (ANS), a 5-day workshop entitled 'Understanding and Teaching about Nuclear Technology and Its Place in Our Society.' More than 30 middle and high school teachers from the New England area (Connecticut, New Hampshire, and Massachusetts) attended the workshop, which was held June 24 through 28, 1991. Based on this experience, and with the expectation of replicating if not improving upon initial success, plans are now under way to offer a similar workshop at UML from June 29 through July 3, 1992

  7. Circulatory disease mortality in the Massachusetts tuberculosis fluoroscopy cohort study

    International Nuclear Information System (INIS)

    Little, Mark P.; Zablotska, Lydia B.; Brenner, Alina V.; Lipshultz, Steven E.

    2016-01-01

    High-dose ionizing radiation is associated with circulatory disease. Risks from lower-dose fractionated exposures, such as from diagnostic radiation procedures, remain unclear. In this study we aimed to ascertain the relationship between fractionated low-to-medium dose radiation exposure and circulatory disease mortality in a cohort of 13,568 tuberculosis patients in Massachusetts, some with fluoroscopy screenings, between 1916 and 1961 and follow-up until the end of 2002. Analysis of mortality was in relation to cumulative thyroid (cerebrovascular) or lung (all other circulatory disease) radiation dose via Poisson regression. Over the full dose range, there was no overall radiation-related excess risk of death from circulatory disease (n = 3221; excess relative risk/Gy −0.023; 95 % CI −0.067, 0.028; p = 0.3574). Risk was somewhat elevated in hypertensive heart disease (n = 89; excess relative risk/Gy 0.357; 95 % CI −0.043, 1.030, p = 0.0907) and slightly decreased in ischemic heart disease (n = 1950; excess relative risk/Gy −0.077; 95 % CI −0.130, −0.012; p = 0.0211). However, under 0.5 Gy, there was a borderline significant increasing trend for all circulatory disease (excess relative risk/Gy 0.345; 95 % CI −0.032, 0.764; p = 0.0743) and for ischemic heart disease (excess relative risk/Gy 0.465; 95 % CI, −0.032, 1.034, p = 0.0682). Pneumolobectomy increased radiation–associated risk (excess relative risk/Gy 0.252; 95 % CI 0.024, 0.579). Fractionation of dose did not modify excess risk. In summary, we found no evidence of radiation-associated excess circulatory death risk overall, but there are indications of excess circulatory death risk at lower doses (<0.5 Gy). Although consistent with other radiation-exposed groups, the indications of higher risk at lower doses are unusual and should be confirmed against other data.

  8. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  9. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  10. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  11. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  12. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  13. Risk assessment techniques for industrial installations

    International Nuclear Information System (INIS)

    Croitoru, C.; Dumitrescu, M.; Preda, I.; Stefanescu, I.; Titescu, G.

    1995-01-01

    This paper presents a risk analysis which concerns the following stages: identification of the initiation events, evaluation of the occurrence frequency of different accident sequences, assessment of human, economical, and environmental consequences, risk assessment and management. The study of the accident sequences subsequent to an initiation event was achieved by the event tree method. Also, there were developed methods based on mathematical models of installations which take into account reliability data, data concerning the exploitation history, and data referring to the human factor effects in the installation operation. These methods were used for the determination of occurrence frequencies of hydrogen sulfide emission accidents in the heavy water production installations

  14. Installation for producing sealed radioactive sources

    International Nuclear Information System (INIS)

    Fradin, J.; Hayoun, C.

    1969-01-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [fr

  15. RF accelerating unit installed in the PSB

    CERN Multimedia

    CERN PhotoLab

    1972-01-01

    RF accelerating unit installed in the PSB ring between two bending magnets. Cool air from a heat exchanger is injected into the four cavities from the central feeder and the hot air recirculated via the lateral ducts.

  16. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  17. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  18. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  19. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  20. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  1. Radioelement gauges. Appliances intended for permanent installation

    International Nuclear Information System (INIS)

    1975-08-01

    The present norm defines for radioelement gauges intended for permanent installation: a classification of instruments and beam shutter devices; recommended construction techniques which satisfy health physics requirements; monitoring and test methods; information which must appear on the instruments [fr

  2. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  3. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  4. Simulated responses of streams and ponds to groundwater withdrawals and wastewater return flows in southeastern Massachusetts

    Science.gov (United States)

    Carlson, Carl S.; Walter, Donald A.; Barbaro, Jeffrey R.

    2015-12-21

    Water use, such as withdrawals, wastewater return flows, and interbasin transfers, can alter streamflow regimes, water quality, and the integrity of aquatic habitat and affect the availability of water for human and ecosystem needs. To provide the information needed to determine alteration of streamflows and pond water levels in southeastern Massachusetts, existing groundwater models of the Plymouth-Carver region and western (Sagamore flow lens) and eastern (Monomoy flow lens) Cape Cod were used to delineate subbasins and simulate long-term average and average monthly streamflows and pond levels for a series of water-use conditions. Model simulations were used to determine the extent to which streamflows and pond levels were altered by comparing simulated streamflows and pond levels under predevelopment conditions with streamflows and pond levels under pumping only and pumping with wastewater return flow conditions. The pumping and wastewater return flow rates used in this study are the same as those used in previously published U.S. Geological Survey studies in southeastern Massachusetts and represent the period from 2000 to 2005. Streamflow alteration for the nontidal portions of streams in southeastern Massachusetts was evaluated within and at the downstream outlets of 78 groundwater subbasins delineated for this study. Evaluation of streamflow alteration at subbasin outlets is consistent with the approach used by the U.S. Geological Survey for the topographically derived subbasins in the rest of Massachusetts.

  5. Revisiting the Reusability and Openness of Resources in the Massachusetts Institute of Technology Open Courseware

    Science.gov (United States)

    Nkuyubwatsi, Bernard

    2018-01-01

    The marketing of the Massachusetts Institute of Technology (MIT) Open Courseware gives the impression that it has the potential to contribute to quality open learning and opening up higher education globally. It is from this perspective that the potential contribution of Open Educational Resources (OER) units in the MIT Open Courseware to opening…

  6. A Place Called Home: Educational Reform in a Concord, Massachusetts School, 1897-1914

    Science.gov (United States)

    Morice, Linda C.

    2012-01-01

    This paper examines the role of place in the reform efforts of two teachers who established Miss White's Home School in Concord, Massachusetts (USA). Flora and Mary White rebelled against the prevailing industrial model of instruction in tax-supported schools where they taught. As a solution, they moved to Concord--a nonconformist town with a…

  7. Strange bedfellows: the history of collaboration between the Massachusetts Restaurant Association and the tobacco industry.

    Science.gov (United States)

    Ritch, W A; Begay, M E

    2001-01-01

    OBJECTIVES: This article examines the historical relationship between the tobacco industry and the Massachusetts Restaurant Association, a nonprofit trade association aligned with the food and beverage industry. METHODS: The study analyzed data from Web-based tobacco industry documents, public relations materials, news articles, testimony from public hearings, requests for injunctions, court decisions, economic impact studies, handbooks, and private correspondence. RESULTS: Tobacco industry documents that became public after various state lawsuits reveal that a long history of collaboration exists between the Massachusetts Restaurant Association and the tobacco industry. For more than 20 years, their joint efforts have focused primarily on the battle to defeat state and local laws that would restrict smoking in public places, particularly in beverage and food service establishments. The resources of the tobacco industry, combined with the association's grassroots mobilization of its membership, have fueled their opposition to many state and local smoke-free restaurant, bar, and workplace laws in Massachusetts. CONCLUSIONS: The universal opposition of the Massachusetts Restaurant Association to smoking bans in food and beverage establishments is a reflection of its historic relationship with the tobacco industry. PMID:11291372

  8. ARSENIC TRANSPORT ACROSS THE GROUNDWATER – SURFACE WATER INTERFACE AT A SITE IN CENTRAL MASSACHUSETTS

    Science.gov (United States)

    Plow Shop Pond, located in central Massachusetts within the New England ‘arsenic belt,’ receives water from a series of interconnected upstream ponds as well as from upward-discharging groundwater. A small, shallow embayment on the southwest side of the pond is known as Red Cove...

  9. Cost-Effective Business Practices of Schools in Massachusetts. A Collaborative Dissemination Project.

    Science.gov (United States)

    Merrimack Education Center, Chelmsford, MA.

    The verified successful business practices described in this booklet were being used by Massachusetts schools in the late 1970s. The practices have resulted in cost savings, are generally easy to replicate, and usually do not require major capital outlay. The practices listed are largely conservation practices or relate to food service management,…

  10. How Not to Strike it Rich: Semantics, Pragmatics, and Semiotics of a Massachusetts Lottery Game Card

    Science.gov (United States)

    Butters, Ronald R.

    2004-01-01

    In 2001, the Massachusetts State Lottery Commission released for sale a new "instant lottery ticket" "scratch-and-play" game card named "Caesars [sic] Palace[R]" (played by scratching the surface of each card at designated spots to reveal hidden numbers or images). It offered ten grand prizes of $1,000,000 each and a…

  11. The Past Is Never Dead—Measles Epidemic, Boston, Massachusetts, 1713

    Centers for Disease Control (CDC) Podcasts

    2015-08-04

    Dr. David Morens reads excerpts from his essay about Cotton Mather’s diary, which details the experience and tragedy of the measles outbreak in Boston, Massachusetts in 1713.  Created: 8/4/2015 by National Center for Emerging and Zoonotic Infectious Diseases (NCEZID).   Date Released: 8/4/2015.

  12. 78 FR 40265 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Science.gov (United States)

    2013-07-03

    ...-3275, [email protected]dot.gov . For Massachusetts Department of Transportation (MassDOT) Highway Division: Michael Bastoni, Project Manager, MassDOT Highway Division, 10 Park Plaza, Room 6500, Boston, MA 02116, 9...-02157. The EA, FONSI and other project records are available by contacting MassDOT at the address...

  13. 77 FR 6622 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Science.gov (United States)

    2012-02-08

    ..., [email protected]dot.gov . For Massachusetts Department of Transportation (MassDOT) Highway Division: James Cerbone, Project Manager, MassDOT Highway Division, 10 Park Plaza, Room 4260, Boston, MA 02116, 9 a.m. to 5 p.m... be undertaken by MassDOT under the Commonwealth's $3 billion Accelerated Bridge Program. The project...

  14. 77 FR 1782 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts

    Science.gov (United States)

    2012-01-11

    ..., MA 02142, (617) 494-2419, [email protected]dot.gov . For Massachusetts Department of Transportation (MassDOT) Highway Division: Michael Furlong, Project Manager, MassDOT Highway Division, 10 Park Plaza, Room 4260... project records. The EA, FONSI and other project records are available by contacting FHWA or MassDOT at...

  15. The Constitutional Duty to "Cherish" Public Schools in Massachusetts: More than a Matter of Money.

    Science.gov (United States)

    Fossey, Richard

    1994-01-01

    Analyzes the Massachusetts Supreme Judicial Court's decision in "McDuffy" and places it in the context of other state court decisions that have declared public school finance schemes unconstitutional. "McDuffy" requires the state legislature to provide additional money for poor school districts and strive to achieve a high…

  16. 40 CFR 81.142 - Central Massachusetts Intrastate Air Quality Control Region.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Central Massachusetts Intrastate Air Quality Control Region. 81.142 Section 81.142 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Township—Ashburnham, Ashby, Athol, Auburn, Barre, Berlin, Blackstone, Boylston, Brookfield, Charlton...

  17. Part of the Job? Workplace Violence in Massachusetts Social Service Agencies

    Science.gov (United States)

    Zelnick, Jennifer R.; Slayter, Elspeth; Flanzbaum, Beth; Butler, Nanci Ginty; Domingo, Beryl; Perlstein, Judith; Trust, Carol

    2013-01-01

    Workplace violence is a serious and surprisingly understudied occupational hazard in social service settings. The authors of this study conducted an anonymous, Internet-based survey of Massachusetts social service agencies to estimate the incidence of physical assault and verbal threat of violence in social service agencies, understand how social…

  18. Focusing on the Whole Student: An Evaluation of Massachusetts's Wraparound Zone Initiative

    Science.gov (United States)

    Gandhi, Allison Gruner; Slama, Rachel; Park, So Jung; Russo, Patrick; Winner, Kendra; Bzura, Robin; Jones, Wehmah; Williamson, Sandra

    2018-01-01

    We used a comparative interrupted time series design to examine the impact of the Massachusetts' Wraparound Zone Initiative on student achievement, attendance, retention, and suspension. This initiative was designed to create coordinated district systems that allow schools to proactively and systematically address students' nonacademic needs. The…

  19. Estimated medical cost savings in Massachusetts by implementation of a primary seat belt law

    Science.gov (United States)

    2008-12-01

    This report examines 2006 hospital discharge data reporting cases where the external cause of injury to a vehicle occupant was a motor vehicle crash to predict the estimated savings to Massachusetts if a primary seat belt law is implemented. The savi...

  20. Intermediate photovoltaic system application experiment operational performance report. Volume 9 for Beverly High School, Beverly, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    1982-07-01

    Presented are the data accumulated during May 1982 at the intermediate photovoltaic project at Beverly High School, Beverly, Massachusetts. Generated energy and environmental (weather) data are presented graphically. Explanations of irregularities not attributable to weather are provided. Due to computer damage data were acquired for only the first 7 days of the month, although the PV system continued normal operation.

  1. Innovation with Impact: Industry-Education Partnerships in Massachusetts. Publication #15311.

    Science.gov (United States)

    Freedman, Susan; Aschheim, Barbara

    This document describes six industry-education partnerships in Massachusetts selected as exemplary and 14 selected as outstanding. They represent innovative and collaborative ways to address dropout prevention, at-risk and special needs students, adult literacy, basic skill development, and enrichment needs of students. Each entry provides this…

  2. A chronology of hurricane landfalls at Little Sippewissett Marsh, Massachusetts, USA, using optical dating

    DEFF Research Database (Denmark)

    Madsen, Anni Tindahl; Duller, G.A.T.; Donnelly, J.P.

    2009-01-01

    Optical dating has been applied to sediments preserved in Little Sippewissett Marsh, Massachusetts, USA, which are associated with overwashing of the beach barrier during hurricane strikes on the coast. The aims were to determine the hurricane landfall frequency, and make comparisons with indepen...

  3. Emergency response to a highway accident in Springfield, Massachusetts, on December 16, 1991

    International Nuclear Information System (INIS)

    1992-06-01

    On December 16, 1991, a truck carrying unirradiated (fresh) nuclear fuel was involved in an accident on US Interstate 91, in Springfield, Massachusetts. This report describes the emergency response measures undertaken by local, State, Federal, and private parties. The report also discusses ''lessons learned'' from the response to the accident and suggests areas where improvements might be made

  4. 75 FR 62892 - Massachusetts Institute of Technology Research Reactor Environmental Assessment and Finding of No...

    Science.gov (United States)

    2010-10-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-020; NRC-2010-0313] Massachusetts Institute of Technology Research Reactor Environmental Assessment and Finding of No Significant Impact Correction In notice document 2010-24809 beginning on page 61220 in the issue of Monday, October 4, 2010, make the...

  5. 75 FR 82055 - Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore Massachusetts...

    Science.gov (United States)

    2010-12-29

    ... Island and BOEMRE/Massachusetts Renewable Energy Task Forces in moving forward with renewable energy... of Gay Head (Aquinnah), the Mashpee Wampanoag Tribe, and representatives from the towns of Tisbury... interest invalid. In that case, BOEMRE would not move forward with your indication of interest submitted in...

  6. Cavity-nesting bird abundance in thinned versus unthinned Massachusetts oak stands

    Science.gov (United States)

    Christopher J.E. Welsh; William M. Healy; Richard M. DeGraaf

    1992-01-01

    Cavity-nesting birds provide significant benefits to forest communities, but timber management techniques may negatively affect cavity-nesting species by reducing the availability of suitable nest and foraging sites. We surveyed cavity-nesting birds from transects in eight Massachusetts oak stands to examine the effect of thinning with retention of snag and wildlife...

  7. Hydrologic and nutrient response of groundwater to flooding of cranberry farms in southeastern Massachusetts, USA

    Science.gov (United States)

    Seasonal flooding of cranberry farms is essential for long-term sustainability of cranberry production in southeastern Massachusetts, with roughly 90% of growers flooding for fall harvesting and winter protection. Although considered a significant source of recharge to the regional unconfined aquif...

  8. 78 FR 54960 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Reasonably...

    Science.gov (United States)

    2013-09-09

    ... reasonably available control technology (RACT) for oxides of nitrogen (NO X ) and volatile organic compounds... are approving updates to two existing regulations limiting emissions of volatile organic compounds... certification in Massachusetts' January 31, 2008 SIP submittal that demonstrates that the state has adopted air...

  9. 33 CFR 165.115 - Safety and Security Zones; Pilgrim Nuclear Power Plant, Plymouth, Massachusetts.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety and Security Zones; Pilgrim Nuclear Power Plant, Plymouth, Massachusetts. 165.115 Section 165.115 Navigation and Navigable... Coast Guard District § 165.115 Safety and Security Zones; Pilgrim Nuclear Power Plant, Plymouth...

  10. Strange bedfellows: the history of collaboration between the Massachusetts Restaurant Association and the tobacco industry.

    Science.gov (United States)

    Ritch, W A; Begay, M E

    2001-04-01

    This article examines the historical relationship between the tobacco industry and the Massachusetts Restaurant Association, a nonprofit trade association aligned with the food and beverage industry. The study analyzed data from Web-based tobacco industry documents, public relations materials, news articles, testimony from public hearings, requests for injunctions, court decisions, economic impact studies, handbooks, and private correspondence. Tobacco industry documents that became public after various state lawsuits reveal that a long history of collaboration exists between the Massachusetts Restaurant Association and the tobacco industry. For more than 20 years, their joint efforts have focused primarily on the battle to defeat state and local laws that would restrict smoking in public places, particularly in beverage and food service establishments. The resources of the tobacco industry, combined with the association's grassroots mobilization of its membership, have fueled their opposition to many state and local smoke-free restaurant, bar, and workplace laws in Massachusetts. The universal opposition of the Massachusetts Restaurant Association to smoking bans in food and beverage establishments is a reflection of its historic relationship with the tobacco industry.

  11. No association of smoke-free ordinances with profits from bingo and charitable games in Massachusetts

    OpenAIRE

    Glantz, S; Wilson-Loots, R

    2003-01-01

    Background: Because it is widely played, claims that smoking restrictions will adversely affect bingo games is used as an argument against these policies. We used publicly available data from Massachusetts to assess the impact of 100% smoke-free ordinances on profits from bingo and other gambling sponsored by charitable organisations between 1985 and 2001.

  12. 33 CFR 165.116 - Safety and Security Zones; Salem and Boston Harbors, Massachusetts.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety and Security Zones; Salem..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY REGULATED NAVIGATION AREAS AND LIMITED... § 165.116 Safety and Security Zones; Salem and Boston Harbors, Massachusetts. (a) Location. The...

  13. 33 CFR 165.114 - Safety and Security Zones: Escorted Vessels-Boston Harbor, Massachusetts.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety and Security Zones... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY REGULATED NAVIGATION... Guard District § 165.114 Safety and Security Zones: Escorted Vessels—Boston Harbor, Massachusetts. (a...

  14. The Enough Abuse Campaign: Building the Movement to Prevent Child Sexual Abuse in Massachusetts

    Science.gov (United States)

    Schober, Daniel J.; Fawcett, Stephen B.; Bernier, Jetta

    2012-01-01

    This case study describes the Enough Abuse Campaign, a multidisciplinary, statewide effort to prevent child sexual abuse in Massachusetts. The study uses the Institute of Medicine's Framework for Collaborative Community Action on Health to provide a systematic description of the campaign's process of implementation, which includes: (a) developing…

  15. 76 FR 1337 - Asian Longhorned Beetle; Additions to Quarantined Areas in Massachusetts and New York

    Science.gov (United States)

    2011-01-10

    .... APHIS-2009-0014] Asian Longhorned Beetle; Additions to Quarantined Areas in Massachusetts and New York... rule. SUMMARY: We are adopting as a final rule, without change, an interim rule that amended the Asian..., MD 20737-1231; (301) 734-5705. SUPPLEMENTARY INFORMATION: Background The Asian longhorned beetle (ALB...

  16. 77 FR 22663 - Asian Longhorned Beetle; Additions to Quarantined Areas in Massachusetts

    Science.gov (United States)

    2012-04-17

    ...-0128] Asian Longhorned Beetle; Additions to Quarantined Areas in Massachusetts AGENCY: Animal and Plant... adopting as a final rule, without change, an interim rule that amended the Asian longhorned beetle (ALB... INFORMATION: Background The Asian longhorned beetle (ALB, Anoplophora glabripennis), an insect native to China...

  17. 77 FR 31720 - Asian Longhorned Beetle; Quarantined Areas in Massachusetts, Ohio, and New York

    Science.gov (United States)

    2012-05-30

    .... APHIS-2012-0003] Asian Longhorned Beetle; Quarantined Areas in Massachusetts, Ohio, and New York AGENCY...: We are amending the Asian longhorned beetle regulations to make changes to the list of quarantined... the artificial spread of Asian longhorned beetle to noninfested areas of the United States and to...

  18. Provider Payment Trends and Methods in the Massachusetts Health Care System

    OpenAIRE

    Allison Barrett; Timothy Lake

    2010-01-01

    This report investigates provider payment methods in Massachusetts. Payments include fee-for-service, the predominant model; global payments, which pay providers a single fee for all or most required services during a contract period; and pay-for-performance models, which layer quality incentives onto payments.

  19. The Massachusetts Community College Performance-Based Funding Formula: A New Model for New England?

    Science.gov (United States)

    Salomon-Fernandez, Yves

    2014-01-01

    The Massachusetts community college system is entering a second year with funding for each of its 15 schools determined using a new performance-based formula. Under the new model, 50% of each college's allocation is based on performance on metrics related to enrollment and student success, with added incentives for "at-risk" students…

  20. Teaching Humanities in Medicine: The University of Massachusetts Family Medicine Residency Program Experience

    Science.gov (United States)

    Silk, Hugh; Shields, Sara

    2012-01-01

    Humanities in medicine (HIM) is an important aspect of medical education intended to help preserve humanism and a focus on patients. At the University of Massachusetts Family Medicine Residency Program, we have been expanding our HIM curriculum for our residents including orientation, home visit reflective writing, didactics and a department-wide…

  1. Higher Education Civic Learning and Engagement: A Massachusetts Case Study. Promising Practices

    Science.gov (United States)

    Brennan, Jan

    2017-01-01

    This Promising Practices report explores the civic learning and engagement efforts of Massachusetts' public higher education system in five areas: vision of Preparing Citizens as a core educational commitment, development of a state higher education Policy on Civic Learning, creation of civic engagement and service-learning course designations,…

  2. 76 FR 31241 - Prevention of Significant Deterioration (PSD) Program; Massachusetts; Announcing Delegation...

    Science.gov (United States)

    2011-05-31

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [A-1-FRL-9310-9] Prevention of Significant... Department of Environmental Protection AGENCY: Environmental Protection Agency (EPA). ACTION: Announcement of... an agreement with the Massachusetts Department of Environmental Protection (MassDEP) delegating...

  3. 78 FR 46552 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Regulations...

    Science.gov (United States)

    2013-08-01

    ... by the Commonwealth of Massachusetts. These are revisions to existing air pollution control... facilitate interpretation and understanding, and enhance enforceability, of the state's air pollution control... emission limits, was added to the following sections: of 310 CMR 7.18: (21), Surface Coating of Plastic...

  4. 77 FR 58469 - Asian Longhorned Beetle; Quarantined Areas in Massachusetts, Ohio, and New York

    Science.gov (United States)

    2012-09-21

    ...;Prices of new books are listed in the first FEDERAL REGISTER issue of each #0;week. #0; #0; #0; #0;#0.... APHIS-2012-0003] Asian Longhorned Beetle; Quarantined Areas in Massachusetts, Ohio, and New York AGENCY... its review under Executive Order 12866. List of Subjects in 7 CFR Part 301 Agricultural commodities...

  5. 75 FR 35660 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-06-23

    ... copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form... hard copy at the following two locations: (i) Massachusetts Department of Environmental Protection...: dredged material exemption at 40 CFR 261.4(g)--State: formatting corrections to previously authorized...

  6. Guidelines for Managing Life-Threatening Food Allergies in Massachusetts Schools

    Science.gov (United States)

    Sheetz, Anne H.; Goldman, Patricia G.; Millett, Kathleen; Franks, Jane C.; McIntyre, C. Lynne; Carroll, Constance R.; Gorak, Diane; Harrison, Christanne Smith; Carrick, Michele Abu

    2004-01-01

    During the past decade, prevalence of food allergies among children increased. Caring for children with life-threatening food allergies has become a major challenge for school personnel Prior to 2002, Massachusetts did not provide clear guidelines to assist schools in providing a safe environment for these children and preparing for an emergency…

  7. 75 FR 54299 - Agenda and Notice of Public Meeting of the Massachusetts State Advisory Committee

    Science.gov (United States)

    2010-09-07

    .... Commission on Civil Rights and the Federal Advisory Committee Act, that briefing and planning meetings of the... Advisory Committee to continue its work on English Language Learners. The purpose of the planning meeting... COMMISSION ON CIVIL RIGHTS Agenda and Notice of Public Meeting of the Massachusetts State Advisory...

  8. Drought and Water Supply. Implications of the Massachusetts Experience for Municipal Planning.

    Science.gov (United States)

    Russell, Clifford S.; And Others

    This book uses the 1962-66 Massachusetts drought data as a base of information to build a planning model of water resources that is of interest to students and professionals involved with water management. Using a demand-supply ratio to measure the relative inadequacy of a given water system, the authors then project demand into the drought period…

  9. The Burden of Urban Education: Public Schools in Massachusetts, 1870-1915.

    Science.gov (United States)

    Lazerson, Marvin

    Confronted by a rapidly changing urban-industrial society, Massachusetts educators undertook reforms between 1870 and 1915 to make the public school a more relevant institution. Kindergarten, manual training, vocational education, evening schools, and citizenship education represented answers to problems arising from industrialism and urbanism.…

  10. A Handbook on Legal Rights of Developmentally Disabled People in Massachusetts.

    Science.gov (United States)

    Ambrogi, Robert; And Others

    The handbook provides information in question-and-answer format on the legal rights of developmentally disabled persons, focusing on those in the state of Massachusetts. An introductory section discusses developmental disabilities and advocacy. The main section, on legal rights, covers such areas as discrimination (including Section 504 of the…

  11. The nuclear installations face to their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October fifteenth 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (author)

  12. A method of installing a reactor container

    International Nuclear Information System (INIS)

    Hayashi, Kenji; Murakawa, Hisao.

    1975-01-01

    Object: To achieve exact installation of a reactor container at a site. Structure: A pole is set upright at the center of a cylindrical base portion, a plurality of beams are disposed around the pole in a radial fashion to form a cone, a plurality of steel plates are mounted successively around the cone through a ring, and the steel plates are welded to each other to assemble and install a reactor container at the same time. (Kamimura, M.)

  13. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  14. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  15. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  16. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  17. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  18. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  19. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  20. Geohydrology and limnology of Walden Pond, Concord, Massachusetts

    Science.gov (United States)

    Colman, John A.; Friesz, Paul J.

    2001-01-01

    The trophic ecology and ground-water contributing area of Walden Pond, in Concord and Lincoln, Mass., were investigated by the U.S. Geological Survey in cooperation with the Massachusetts Department of Environmental Management from April 1997 to July 2000. Bathymetric investigation indicated that Walden Pond (24.88 hectares), a glacial kettle-hole lake with no surface inlet or outlet, has three deep areas. The maximum depth (30.5 meters) essentially was unchanged from measurements made by Henry David Thoreau in 1846. The groundwater contributing area (621,000 square meters) to Walden Pond was determined from water-table contours in areas of stratified glacial deposits and from land-surface contours in areas of bedrock highs. Walden Pond is a flow-through lake: Walden Pond gains water from the aquifer along its eastern perimeter and loses water to the aquifer along its western perimeter. Walden Pond contributing area also includes Goose Pond and its contributing area. A water budget calculated for Walden Pond, expressed as depth of water over the lake surface, indicated that 45 percent of the inflow to the lake was from precipitation (1.215 meters per year) and 55 percent from ground water (1.47 meters per year). The groundwater inflow estimate was based on the average of two different approaches including an isotope mass-balance approach. Evaporation accounted for 26 percent of the outflow from the lake (0.71 meters per year) whereas lake-water seepage to the groundwater system contributed 74 percent of the outflow (1.97 meters per year). The water-residence time of Walden Pond is approximately 5 years. Potential point sources of nutrients to ground water, the Concord municipal landfill and a trailer park, were determined to be outside the Walden Pond groundwater contributing area. A third source, the septic leach field for the Walden Pond State Reservation facilities, was within the groundwater contributing area. Nutrient budgets for the lake indicated that

  1. Surficial and applied surficial geology of the Belchertown Quadrangle, Massachusetts

    Science.gov (United States)

    Caggiano, Joseph A.

    1977-01-01

    Till and stratified drift overlie maturely dissected topography in the Belchertown quadrangle, an area that straddles the New England Upland and Connecticut Valley Lowland in central Massachusetts. Lower Paleozoic, massive quartzo-feldspathic gneiss, quartzite and schist of the Pelham dome and Devonian granodiorite and quartz diorite of the Belchertown intrusive complex are in contact with Triassic arkosic fanglomerate and basalt along a lengthy normal fault separating the New England Upland from the Connecticut Valley Lowland. The orientation of striae, roches moutonnees, and streamline ridges indicate that the last Wisconsinian glacier advanced generally south 12? east. This glacier removed several meters of rock from the upland and an unknown larger quantity from the preglacial valley of the Connecticut River. Till is thin in the uplands, but several tens of feet of drift overlie bedrock in the lowland. Three lithic facies of sandy, clast-rich, non-compact, subarkosic till derived from the three major source rocks rest on bedrock or on highly weathered, compact, clast-poor, fissile probably older till. The mean for all upper till is 69.6% sand, 21.7% silt, and 8.8% clay; lower till consists of 48% sand, 23% silt and 29% clay. Mud-rich, compact, sparsely stony till in drumlins in and along the flank of the Connecticut Valley Lowland is composed of 51.5% sand, 28% silt, and 20.5% clay. Upper tills are facies equivalent deposits of the youngest Wisconsinian drift. Lower till is compact deeply weathered, jointed and stained suggesting it is correlative with other lower till in New England deposited by an earlier Wisconsinian glacier. Drumlin till may be a facies equivalent of a lower till or a mud-rich upper till derived from earlier glaciolacustrine deposits. Upper and lower till of the Belchertown quadrangle is texturally similar to other New England upper and lower tills to which they are equivalent. Both tills are interpreted as lodgment till derived from

  2. U.S. Air Force Installation Restoration Program. Phase 1. Records Search. Air National Guard, Camp Edwards (ARNG), U.S. Air Force and Veteran’s Administration Facilities at Massachusetts Military Reservation, Massachusetts. Task 6

    Science.gov (United States)

    1986-12-11

    MMR main gate (see Figure 3.2-1). In those ponds Umbrella-grass (Guirena-pumila) and Hyssop Hedge- nettle (Stachys- hyssopifolia) were found. The other...has conducted research in Buildings 286 and 240. From 1963 to 1969, the lab tested insecticides for private companies. Residuals from the 4...Airport Turf Insecticidal Treatments for Japanese Beetle and European Chafer, Eastern Region. Stahl, Ralph G., Joachim G. Liehr, and Ernst M. Davis. 1984

  3. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  4. New technique for landfill leachate well installation

    International Nuclear Information System (INIS)

    Hornsby, R.G.; Miller, M.S.

    1991-01-01

    The installation method fulfilled our expectations. The entire well installation took eight writing days to complete, for an average of two wells per day. It met our Health and Safety, waste volume, environmental risk and uniform sandpack expectations. Health and Safety concerns were minimal. We found that virtually all work could be completed using Level D protection. The volume of waste produced by the well installation was extremely low. The core samples and casing scrapings were the only well installation wastes directly produced. The waste containers which required sampling prior to disposal were: Decontaminated water (330 gallons), Personnel protective equipment and water (715 gallons), Soil cores (25 gallons), Land leachate (440 gallons). Each waste type was sampled and submitted to a laboratory for analyses of full Appendix 3 plus U.S. EPA toxicity parameters. The results verified that all of the wastes could be disposed of on-site. Since the only drilling wastes were the clay core samples and the very small amount of material adhering to the casing, contamination of the new clay cap did not occur. A uniform sandpack was guaranteed through the use of a presanded well screen. The loose sand added when the casing was removed served to fill any voids. All the leachate wells have water in them, and it appears that they will function adequately. We are in the process of constructing a treatment and storage facility to manage the liquids to be extracted for off-site disposal. The long-term effectiveness of the wells will be quantified. This well installation method should be considered in situations requiring the following: expedited installation; reduced Health and Safety concerns; reduced disposal costs; reduced potential for adverse environmental impact; and comparable installation costs. The choice of this method must include considerations of the subsurface geology and the nature of any manmade materials

  5. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  6. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  7. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  8. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  9. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  10. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  11. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  12. Childhood cancer and nuclear installations: a review

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1998-01-01

    Many epidemiological studies of childhood cancer around nuclear installations have been conducted in recent years. This article reviews results from Great Britain and elsewhere. Geographical studies have indicated raised risks of childhood leukaemia around some British nuclear installations. However, environmental assessments suggest that the findings are unlikely to be due to radioactive releases from the sites. Case-control studies have allowed more detailed investigation of putative risk factors than is possible from geographical studies. In particular, a recent national study in Britain does not support the hypothesis raised by an earlier study in West Cumbria that paternal radiation exposure prior to conception may increase the risk of leukaemia and non-Hodgkin's lymphoma in offspring. Other studies suggest that childhood leukaemia may have an infective basis, although there is still uncertainty about whether this would explain the findings around nuclear installations. The UK Childhood Cancer Study may provide more information on the causes of these diseases. (author)

  13. Installation Strategy for the LHC Main Dipoles

    CERN Multimedia

    Fartoukh, Stephane David

    2004-01-01

    All positions in the LHC machine are not equivalent in terms of beam requirements on the geometry and the field quality of the main dipoles. In the presence of slightly or strongly out-of tolerance magnets, a well-defined installation strategy will therefore contribute to preserve or even optimize the performance of the machine. Based on the present status of the production, we have anticipated a list of potential issues (geometry, transfer function, field direction and random b3) which, combined by order of priority, have been taken into account to define a simple but efficient installation algorithm for the LHC main dipoles. Its output is a prescription for installing the available dipoles in sequence while reducing to an absolute minimum the number of holes required by geometry or FQ issues.

  14. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  15. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  16. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  17. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  18. Listed installations for environmental protection in hospitals

    International Nuclear Information System (INIS)

    Mullot, J.U.; Chaulet, J.F.; Thual, A.; Lafon, M.

    1999-01-01

    This work deals with the implications of different French rules and regulations concerning the environmental protection in hospitals. A special place is given to listed installations for environmental protection, because of their importance. A summary of important regulatory texts is presented concerning these installations, and also an inventory of installations or activities concerned, and the definition of the necessary procedures. Some ideas are also given about the much needed creation of an 'environmental network' inside hospitals, in order to cope with these concerns. Then, we briefly deal with more recent developments concerning the environmental protection, which will, no doubt, extend to hospitals, such as the French water law, air law, and procedures for the management of medical waste. Finally, the stakes of environmental decisions in hospitals and the chemist's place in these decisions are debated. (authors)

  19. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  20. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  1. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  2. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  3. Questions for the nuclear installations inspectorate

    International Nuclear Information System (INIS)

    Conroy, C.; Flood, M.; MacRory, R.; Patterson, W.C.

    1976-01-01

    The responsibilities of the Nuclear Installations Inspectorate are considered, and the responsibilities of other bodies for (a) reprocessing and enrichment, and (b) security. Questions for the Nuclear Installations Inspectorate are then set out under the following heads: general (on such topics as vandalism, sabotage, threats, security, reactor incidents); magnox reactors; corrosion; advanced gas-cooled reactor; steam generating heavy water reactor; fast breeder reactor; reproces-sing and waste. Most of the questions are concerned with technical problems that have been reported or might possibly arise during construction or operation, affecting the safety of the reactor or process. (U.K.)

  4. Managing for safety at nuclear installations

    International Nuclear Information System (INIS)

    1996-01-01

    This publication, by the Health and Safety Executive's (HSE's) Nuclear Safety Division (NSD), provides a statement of the criteria the Nuclear Installations Inspectorate (NII) uses to judge the adequacy of any proposed or existing system for managing a nuclear installation in so far as it affects safety. These criteria have been developed from the basic HSE model, described in the publication Successful health and safety management that applies to industry generally, in order to meet the additional needs for managing nuclear safety. In addition, the publication identifies earlier studies upon which this work was based together with the key management activities and outputs. (Author)

  5. Measurements of image characteristics of DSA installations

    International Nuclear Information System (INIS)

    Busch, H.P.; Strauss, L.G.; Freimarck, R.D.

    1984-01-01

    Measurements for quantifying the image characteristics were carried out on three DSA installations (DVI 1 - Philips, Angiotron - Siemens and DF 3000 - General Eletric). Contrast resolution was measured with a vessel phantom (General Electric) and spatial resolution with a lead grid. A further parameter was the dose entering the image intensifier. The Angiotron was used with an intensifier with 53 cm. diameter and the DF 3000 with temporal subtraction of the video images and the subtraction of dual energy images (hybrid technique). These measurements can be carried out quickly and easily and are a step towards standardisation of measurements of image characteristics of DSA installations. (orig.) [de

  6. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  7. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Bong Shick; Kim, Y. S.; Lee, C. Y. and others

    1999-03-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and fabrication of main equipment, licensing and technical review for fuel test loop have been performed during 2 years(1997, 1998) for this project. Following contents are described in the report. - Procurement and fabrication of the equipment, piping for OPS - IPS manufacture - License - Technical review and evaluation of the FTL facility. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and review ofHANARO interface have been performed respectively. (author)

  8. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2002-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2002 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2002. There are two installations mentioned in the statement: Dungeness B and Heysham 1. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  9. Natural gas fuelling stations installation code

    Energy Technology Data Exchange (ETDEWEB)

    Barrigar, C; Burford, G; Adragna, M; Hawryn, S

    2004-07-01

    This Canadian Standard applies to natural gas fuelling stations that can be used for fleet and public dispensing operations. This document is divided into 11 sections that address the scope of the Standard; definitions and reference publications; general requirements; compressors; storage; dispensing; flow control devices; storage vessel dispatch and receiving; design, installation and testing of piping, tubing and fittings; and installation of vehicle refuelling appliances (VRAs) connected to storage piping. The most recent revision to the Standard includes requirements for indoor fuelling of natural gas vehicles. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2004. tabs., figs.

  10. PRESSURE - WATER and Other Data from ASTERIAS and Other Platforms From Massachusetts Bay from 19900413 to 19910618 (NODC Accession 9900225)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Hydrophyscial, hydrochemical, and other data were collected from CTD casts in the Massachusetts Bay and other locations from the Asterias and other platforms. Data...

  11. Time of travel and dispersion of a dye plume in the Blackstone River, Massachusetts and Rhode Island, 2009

    Science.gov (United States)

    Parker, Gene W.; Breault, Robert F.; Waite, Andrew M.; Hartman, Elaine

    2011-01-01

    To obtain copies of this report, please contact: Director, Division of Watershed Management, Massachusetts Department of Environmental Protection, 8 New Bond St., Worcester, MA 01608, (508) 792–7650

  12. Intermediate photovoltaic system application experiment operational performance report for Beverly High School, Beverly, Massachusetts for August 1982. Volume 12

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    The data accumulated during August at the intermediate photovoltaic project at Beverly High School, Beverly, Massachusetts are presented. Generated energy and environmental (weather) data are presented graphically. Explanations of irregularities not attributable to weather are provided.

  13. Intermediate photovoltaic system application experiment operational performance report. Volume 14. For Beverly High School, Beverly, Massachusetts for October 1982

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, H.H. Jr.

    1983-02-01

    Presented are the data accumulated during October at the intermediate photovoltaic project at Beverly High School, Beverly, Massachusetts. Generated energy and environmental (weather) data are presented graphically. Explanations of irregularities not attributable to weather are provided.

  14. Intermediate photovoltaic system application experiment operational performance report for Beverly High School, Beverly, Massachusetts for September 1982. Volume 13

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    The data accumulated during September at the intermediate photovoltaic project at Beverly High School, Beverly, Massachusetts are presented. Generated energy and environmental (weather) data are presented graphically. Explanations of irregularities not attributable to weather are provided.

  15. Massachusetts Bay - Internal wave packets digitized from SAR imagery and intersected with a bathymetrically derived slope surface

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This feature class contains internal wave packets digitized from SAR imagery and intersected with a bathymetrically derived slope surface for Massachusetts Bay. The...

  16. Aquatic vegetation were photographed from aircraft from Florida Bay, Indian River (Florida), and the Coast of Massachusetts (NODC Accession 0000411)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Aerial photographs were taken of the aquatic vegetation of Florida Bay, Indian River (Florida), and the Coast of Massachusetts. Photographs were scanned and...

  17. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  18. Exploring Massachusetts Health Care Reform Impact on Fee-for-Service-Funded Substance Use Disorder Treatment Providers.

    Science.gov (United States)

    Fields, Dail; Pruett, Jana; Roman, Paul M

    2015-01-01

    The Affordable Care Act (ACA) is forecast to increase the demand for and utilization of substance use disorder (SUD) treatment. Massachusetts implemented health reforms similar to the ACA in 2006-2007 that included expanding coverage for SUD treatment. This study explored the impact of Massachusetts health reforms from 2007 to 2010 on SUD treatment providers in Massachusetts, who relied on fee-for-service billings for more than 50% of their revenue. The changes across treatment facilities located in Massachusetts were compared to changes in other similar fee-for-service-funded SUD treatment providers in Northeast states bordering Massachusetts and in all other states across the US. From 2007-2010, the percentage changes for Massachusetts based providers were significantly different from the changes among providers located in the rest of the US for admissions, outpatient census, average weeks of outpatient treatment, residential/in-patient census, detoxification census, length of average inpatient and outpatient stays, and provision of medication-assisted treatment. Contrary to previous studies of publicly funded treatment providers, the results of this exploratory study of providers dependent on fee-for-service revenues were consistent with some predictions for the overall effects of the ACA.

  19. Municipal Development of Anaerobic Digestion/ Combined Heat and Power in Massachusetts

    Science.gov (United States)

    Pike, Brenda

    With a commercial food waste ban going into effect in Massachusetts in October 2014, businesses, institutions, and municipalities are considering alternatives to landfills and incinerators for organic waste. Anaerobic digestion is one such alternative. Similar to composting, but in an environment devoid of oxygen, anaerobic digestion produces byproducts such as methane (which can be burned for heat or electricity) and liquid or solid digestate (which can be used as fertilizer, cattle bedding, and more). Thus, disposal of food waste and other organic materials can become a source of revenue rather than just an expense. Municipalities interested in developing anaerobic digestion/combined heat and power (AD/CHP) facilities have the benefit of desirable options for sites, such as landfill gas facilities and wastewater treatment plants, and potential feedstocks in source-separated residential or municipal food waste or wastewater. This thesis examines the opportunities and challenges for municipal development of AD/CHP facilities in Massachusetts.

  20. Solar Stimulus: Perceptions of banks and credit unions towards solar loans in Massachusetts

    Science.gov (United States)

    Bahirwani, Suveer

    Access to finance for residential solar photovoltaic systems (PV) is an essential element of the clean energy economy. Perceptions about solar PV and solar loans among lenders at banks and credit unions shape the availability of lending products for residential solar PV. In March 2015, interviews were carried out among select informants and subsequently, between April and May 2015, a survey was conducted to gauge the perceptions of lenders in Massachusetts. Lenders have a range of concerns with the market and the provision of solar loans. These concerns can be grouped around risk, market size or viability and policy uncertainty. In summary, lending for this segment is not a priority for banks and credit unions in Massachusetts at this time. Recommendations are offered for the lending community and policymakers to improve adoption. Questions for further research are also presented.

  1. Use of hospital discharge data to monitor uterine rupture--Massachusetts, 1990-1997.

    Science.gov (United States)

    2000-03-31

    Uterine rupture (UR), a potentially life-threatening condition for both mother and infant, occurs in vaginal birth after cesarean section (VBAC) (1-4). During 1990-1997, the proportion of vaginal deliveries among women who had previous cesarean sections (CS) in Massachusetts increased 50%, from 22.3% to 33.5% (5). Concern about a corresponding increase in UR prompted the Massachusetts Department of Public Health and CDC to initiate a state-wide investigation that included an assessment of the validity and reliability of International Classification of Diseases, Ninth Revision, Clinical Modification (ICD-9-CM) (6), codes in hospital discharge data to identify UR cases. This report summarizes the results of the investigation, which indicate that ICD-9-CM codes related to UR, designed before increased concern about UR, lack adequate specificity for UR surveillance and have not been applied consistently over time.

  2. Distribution of aquifers, liquid-waste impoundments, and municipal water-supply sources, Massachusetts

    Science.gov (United States)

    Delaney, David F.; Maevsky, Anthony

    1980-01-01

    Impoundments of liquid waste are potential sources of ground-water contamination in Massachusetts. The map report, at a scale of 1 inch equals 4 miles, shows the idstribution of aquifers and the locations of municipal water-supply sources and known liquid-waste impoundments. Ground water, an important source of municipal water supply, is produced from shallow sand and gravel aquifers that are generally unconfined, less than 200 feet thick, and yield less than 2,000 gallons per minute to individual wells. These aquifers commonly occupy lowlands and stream valleys and are most extensive in eastern Massachusetts. Surface impoundments of liquid waste are commonly located over these aquifers. These impoundments may leak and allow waste to infiltrate underlying aquifers and alter their water quality. (USGS)

  3. What Counts in After School? Findings from the Massachusetts Afterschool Research Study (MARS

    Directory of Open Access Journals (Sweden)

    Beth M. Miller

    2007-03-01

    Full Text Available This article discusses the Massachusetts Afterschool Research Study (MARS. Conducted during 2003-2005, MARS took an in-depth look at program structure and quality in 78 varied programs across Massachusetts, using data sources that included interviews with program directors, afterschool program site observations, school district student data, attendance data, and surveys with afterschool program staff, day school teachers, and afterschool program youth. The MARS study offers many useful insights into what afterschool programs look like, approaches to providing high quality experiences for youth, and the connections between high quality and improved outcomes for the young people attending these programs. The results may be useful to programs, policy makers, and others in the field by deepening our understanding of how youth participation leads to a variety of youth outcomes.

  4. Protists from a sewage‐contaminated aquifer on cape cod, Massachusetts

    Science.gov (United States)

    Novarino, Gianfranco; Warren, Alan; Kinner, Nancy E.; Harvey, Ronald W.

    1994-01-01

    Several species of flagellates (genera Bodo, Cercomonas, Cryptaulax, Cyathomonas, Goniomonas, Spumella) have been identified in cultures from a plume of organic contamination (treated sewage effluent) within an aquifer on Cape Cod, Massachusetts. Amoebae and numerous unidentifiable 2‐ to 3‐μm flagellates have also been observed. As a rule, flagellates were associated with solid surfaces, or were capable of temporary surface attachment, corroborating earlier observations from in situ and column transport experiments suggesting that protists in the Massachusetts aquifer have a high propensity for association with sediment grain surfaces. Based on the fact that cultures from the uncontaminated part of the aquifer yielded only a few species of protists, it is hypothesized that the greater abundance and variety of food sources in the contaminant plume is capable of supporting a greater number of protistan species.

  5. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  6. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    of the installation using tools like sketching or storyboarding. The design involves a clarification of available and appropriate building blocks, as well as the linking of these blocks to provide an architectural framework comprising the intended external behavior. The construction phase takes a component...

  7. Solar Energy Installers Curriculum Guides. Final Report.

    Science.gov (United States)

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  8. Geodetic alignment of laser power installations

    International Nuclear Information System (INIS)

    Shtorm, V.V.; Gostev, A.M.; Drobikov, A.V.

    1989-01-01

    Main problems occuring in applied geodesy under initial alignment of laser power installation optical channel are considered. Attention is paid to alignment of lens beamguide telescopic pairs and alignment quality control. Methods and means of geodetic measurements under alignment are indicated. Conclusions are made about the degree of working through certain aspects of the problem

  9. Installation of the ALICE dipole magnet

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The large dipole magnet is installed on the ALICE detector at CERN. This magnet, which is cooled by demineralised water, will bend the path of muons that leave the huge rectangular solenoid (in the background). These muons are heavy electrons that interact less with matter, allowing them to traverse the main section of the detector.

  10. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  11. Door Hardware and Installations; Carpentry: 901894.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in the selection, preparation, and installation of hardware for door assemblies. The course is divided into five blocks of instruction (introduction to doors and hardware, door hardware, exterior doors and jambs, interior doors and jambs, and a quinmester post-test) totaling…

  12. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  13. Installation of the LHC transfer lines begins

    CERN Multimedia

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  14. Participatory ergonomics applied in installation work

    NARCIS (Netherlands)

    Jong, A.M. de; Vink, P.

    2002-01-01

    This paper evaluates a step-by-step participatory approach to better work, applied in reducing the musculoskeletal workload in installation work. To arrive at a reduction in workload, a steering group led the project through the following steps: Introduction: defining the goal and informing all 7000

  15. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  16. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  17. Radionuclides gauges. Gauges designed for permanent installation

    International Nuclear Information System (INIS)

    1987-06-01

    This present norm determines, for radionuclides gauges designed for permanent installation, the characteristics that these gauges should satisfied in their construction and performance to respect the prescriptions. It indicates the testing methods which permit to verify the agreement, gives a classification of gauges and specifies the indications to put on the emitter block [fr

  18. Computer systems for nuclear installation data control

    International Nuclear Information System (INIS)

    1987-09-01

    The computer programs developed by Divisao de Instalacoes Nucleares (DIN) from Brazilian CNEN for data control on nuclear installations in Brazil are presented. The following computer programs are described: control of registered companies, control of industrial sources, irradiators and monitors; control of liable person; control of industry irregularities; for elaborating credence tests; for shielding analysis; control of waste refuge [pt

  19. Installation package - SIMS prototype system 1A

    Science.gov (United States)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  20. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  1. Installation in Outdoor Advertising Designs: Engagement with ...

    African Journals Online (AJOL)

    The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader). If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

  2. Decommissioning and abandonment of offshore installations

    International Nuclear Information System (INIS)

    Side, J.C.

    1992-01-01

    To the onlooker surprising little thought was given at the project planning stage to the fate of offshore facilities once their production lifetimes had come to an end. Throughout the 1970s at least, international law required the complete removal of all structures and installations one disused or abandoned. Fishermen's organisations were led to believe that such installations would be entirely removed yet many of the designs of these show that removal was not much in the minds of the engineers or project management during the design stages. Changes in the text of the United Nations' Convention on the Law of the Sea and (by their widespread legal adoption) in customary international law may now permit partial removal of installations subject to important safeguards for navigation, the environment and other users of the sea. Of the North Sea states at least one has adopted policies that will minimise the cost associated with offshore decommissioning and abandonment and both the UK and Norway are adopting legislation which will provide for a case by case approach to the decommissioning and abandonment of offshore facilities and allow partial removal options. There has thus been a recent and significant change in approach to the abandonment of offshore oil and gas installations. This chapter reviews the development of abandonment laws and policies, outlines the available removal options, and provides a consideration of the environmental and fishery implications of these for the North Sea. (Author)

  3. Expanded access to naloxone among firefighters, police officers, and emergency medical technicians in Massachusetts.

    Science.gov (United States)

    Davis, Corey S; Ruiz, Sarah; Glynn, Patrick; Picariello, Gerald; Walley, Alexander Y

    2014-08-01

    Naloxone is a medication that reverses respiratory depression from opioid overdose if given in time. Paramedics routinely administer naloxone to opioid overdose victims in the prehospital setting, and many states are moving to increase access to the medication. Several jurisdictions have expanded naloxone administration authority to nonparamedic first responders, and others are considering that step. We report here on policy change in Massachusetts, where several communities have equipped emergency medical technicians, law enforcement officers, and firefighters with naloxone.

  4. The Bank of North Dakota: a model for Massachusetts and other states?

    OpenAIRE

    Yolanda Kodrzycki; Tal Elmatad

    2011-01-01

    In 2010, Massachusetts legislators considered whether to create a state-owned bank as a means to address concerns about credit availability and other economic challenges stemming from the financial crisis and Great Recession of 2007-09. In 2011 a commission was established to investigate the feasibility of setting up such an institution. This research report informs the work of that commission. ; The report provides an in-depth examination of the only state-owned bank in the nation, the Bank ...

  5. Using Tire/Pavement Interface Noise Results to Define Statistically Similar Bituminous Pavements in Massachusetts

    OpenAIRE

    Hencken, John; Haas, Edwin; Bennert, Thomas

    2012-01-01

    In October 2010, the Center for Advanced Infrastructure and Transportation (CAIT) utilized the On-Board Sound Intensity Method in Massachusetts to evaluate seven Open-Graded Friction Courses (OGFC) and eight Asphalt Rubber Gap Graded (ARGG) pavements for MassDOT. Since major concerns regarding pavement selection in the northeast revolve around winter conditions and winter maintenance, if noise level similarities could be found between ARGG and OGFC pavements, pavement engineers would be able ...

  6. Highlighting High Performance: Blackstone Valley Regional Vocational Technical High School; Upton, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    2006-10-01

    This brochure describes the key high-performance building features of the Blackstone Valley High School. The brochure was paid for by the Massachusetts Technology Collaborative as part of their Green Schools Initiative. High-performance features described are daylighting and energy-efficient lighting, indoor air quality, solar energy, building envelope, heating and cooling systems, and water conservation. Energy cost savings are also discussed.

  7. Education program at the Massachusetts Institute of Technology research reactor for pre-college science teachers

    International Nuclear Information System (INIS)

    Hopkins, G.R.; Fecych, W.; Harling, O.K.

    1989-01-01

    A Pre-College Science Teacher (PCST) Seminar program has been in place at the Massachusetts Institute of Technology (MIT) Nuclear Reactor Laboratory for 4 yr. The purpose of the PCST program is to educate teachers in nuclear technology and to show teachers, and through them the community, the types of activities performed at research reactors. This paper describes the background, content, and results of the MIT PCST program

  8. Incorporating Road Crossing Data into Vehicle Collision Risk Models for Moose (Alces americanus) in Massachusetts, USA.

    Science.gov (United States)

    Zeller, Katherine A; Wattles, David W; DeStefano, Stephen

    2018-05-09

    Wildlife-vehicle collisions are a human safety issue and may negatively impact wildlife populations. Most wildlife-vehicle collision studies predict high-risk road segments using only collision data. However, these data lack biologically relevant information such as wildlife population densities and successful road-crossing locations. We overcome this shortcoming with a new method that combines successful road crossings with vehicle collision data, to identify road segments that have both high biological relevance and high risk. We used moose (Alces americanus) road-crossing locations from 20 moose collared with Global Positioning Systems as well as moose-vehicle collision (MVC) data in the state of Massachusetts, USA, to create multi-scale resource selection functions. We predicted the probability of moose road crossings and MVCs across the road network and combined these surfaces to identify road segments that met the dual criteria of having high biological relevance and high risk for MVCs. These road segments occurred mostly on larger roadways in natural areas and were surrounded by forests, wetlands, and a heterogenous mix of land cover types. We found MVCs resulted in the mortality of 3% of the moose population in Massachusetts annually. Although there have been only three human fatalities related to MVCs in Massachusetts since 2003, the human fatality rate was one of the highest reported in the literature. The rate of MVCs relative to the size of the moose population and the risk to human safety suggest a need for road mitigation measures, such as fencing, animal detection systems, and large mammal-crossing structures on roadways in Massachusetts.

  9. Results from the Evaluation of the Massachusetts Nursing Home Connection Program

    Science.gov (United States)

    1989-10-01

    For the rollovers, the midpoint data was collected at the time of transfer to the new system of care. The basic comparisons were from admission to...claims data from both the Medicare and Medicaid programs as well as nursing home data from the Massachusetts Medicaid Medical Information System ...Patients Rollovers )ieaes of nervus systern 13 15 Dementia 31 35 CVA 27 29 HIP 18 1 5 b Cancer 07 041) Neurologic disorders 6(30 62 )epression 03 04

  10. Final Environmental Assessment to Renovate Fourth Cliff Recreational Area at Hanscom Air Force Base, Massachusetts

    Science.gov (United States)

    2014-11-17

    Renovate Fourth Cliff Recreational Annex Grading and topography changes may be necessary to design an appropriate drainage system at the site...goals: 1) Increase safety for personnel and patrons at the site; 2) Provide protection of the exposed cliff face from rainwater runoff; 3) Provide...be followed. Drainage design must meet Massachusetts Stormwater Management Standards, as well as comply with the Federal Clean Water Act. Solid

  11. The Japanese Version of the Massachusetts General Hospital Acupuncture Sensation Scale: A Validation Study

    OpenAIRE

    Masako Nishiwaki; Miho Takayama; Hiroyoshi Yajima; Morihiro Nasu; Jian Kong; Nobuari Takakura

    2017-01-01

    Acupuncture sensations are considered essential in producing the treatment effect of acupuncture. The Massachusetts General Hospital Acupuncture Sensation Scale (MASS) is a frequently used scale in acupuncture research to measure acupuncture sensations. We translated the MASS into Japanese (Japanese MASS) based on Beaton's guidelines. 30 acupuncturists evaluated the relevancy and meaning of the 12 descriptors included in the Japanese MASS. The content validity ratios for 10 of the 12 descript...

  12. Ethnicity, maternal risk, and birth weight among Hispanics in Massachusetts, 1987-89.

    OpenAIRE

    Cohen, B B; Friedman, D J; Mahan, C M; Lederman, R; Munoz, D

    1993-01-01

    National data reveal that low birth weight and infant mortality rates among Hispanics are, in general, between the rates for whites and those for blacks. The question remains, do differences in low birth weight reflect distributions of known risk factors, or do ethnic differences persist after simultaneously adjusting for intervening variables? In this study, Massachusetts birth certificate data for 206,973 white non-Hispanic infants and 19,571 Hispanic infants are used to examine differences...

  13. Roughans Point, Revere, Massachusetts Coastal Flood Protection Study. Volume I. Main Report.

    Science.gov (United States)

    1982-12-01

    1982 conducted bT, Rusty Iwanowicz , Massachusetts Division of Marine Fisheries, concluded that the shoreline area that would be impacted by the... Iwanowicz , DMF, and Charles Freeman of my staff. In this survey, five test holes were dug seaward of the area of project impact in areas which Mr... Iwanowicz felt would indicate the productivity of the clam flat. Two holes revealed no shellfish, and the best hole produced two razor clams, two

  14. Association of Industry Payments to Physicians With the Prescribing of Brand-name Statins in Massachusetts.

    Science.gov (United States)

    Yeh, James S; Franklin, Jessica M; Avorn, Jerry; Landon, Joan; Kesselheim, Aaron S

    2016-06-01

    Pharmaceutical industry payments to physicians may affect prescribing practices and increase costs if more expensive medications are prescribed. Determine the association between industry payments to physicians and the prescribing of brand-name as compared with generic statins for lowering cholesterol. Cross-sectional linkage of the Part D Medicare prescriptions claims data with the Massachusetts physicians payment database including all licensed Massachusetts physicians who wrote prescriptions for statins paid for under the Medicare drug benefit in 2011. The exposure variable was a physician's industry payments as listed in the Massachusetts database. The outcome was the physician's rate of prescribing brand-name statins. We used linear regression to analyze the association between the intensity of physicians' industry relationships (as measured by total payments) and their prescribing practices, as well as the effects of specific types of payments. Among the 2444 Massachusetts physicians in the Medicare prescribing database in 2011, 899 (36.8%) received industry payments. The most frequent payment was for company-sponsored meals (n = 639 [71.1%]). Statins accounted for 1 559 003 prescription claims; 356 807 (22.8%) were for brand-name drugs. For physicians with no industry payments listed, the median brand-name statin prescribing rate was 17.8% (95% CI, 17.2%-18.4%). For every $1000 in total payments received, the brand-name statin prescribing rate increased by 0.1% (95% CI, 0.06%-0.13%; P associated with a 4.8% increase in the rate of brand-name prescribing (P = .004); other forms of payments were not. Industry payments to physicians are associated with higher rates of prescribing brand-name statins. As the United States seeks to rein in the costs of prescription drugs and make them less expensive for patients, our findings are concerning.

  15. Groundwater-quality data for a treated-wastewater plume near the Massachusetts Military Reservation, Ashumet Valley, Cape Cod, Massachusetts, 2006-08

    Science.gov (United States)

    Savoie, Jennifer G.; LeBlanc, Denis R.; Fairchild, Gillian M.; Smith, Richard L.; Kent, Douglas B.; Barber, Larry B.; Repert, Deborah A.; Hart, Charles P.; Keefe, Steffanie H.; Parsons, Luke A.

    2012-01-01

    A plume of contaminated groundwater extends from former disposal beds at the Massachusetts Military Reservation's wastewater-treatment plant toward Ashumet Pond, coastal ponds, and Vineyard Sound, Cape Cod, Massachusetts. Treated sewage-derived wastewater was discharged to the rapid-infiltration beds for nearly 60 years before the disposal site was moved to a different location in December 1995. Water-quality samples were collected from monitoring wells, multilevel samplers, and profile borings to characterize the nature and extent of the contaminated groundwater and to observe the water-quality changes after the wastewater disposal ceased. Data are presented here for water samples collected in 2007 from 394 wells (at 121 well-cluster locations) and 780 multilevel-sampler ports (at 42 locations) and in 2006-08 at 306 depth intervals in profile borings (at 20 locations) in and near the treated-wastewater plume. Analyses of these water samples for field parameters (specific conductance, pH, dissolved oxygen and phosphate concentrations, and alkalinity); absorbance of ultraviolet/visible light; and concentrations of nitrous oxide, dissolved organic carbon, methylene blue active substances, selected anions and nutrients, including nitrate and ammonium, and selected inorganic solutes, including cations, anions, and minor elements, are presented in tabular format. The natural restoration of the sand and gravel aquifer after removal of the treated-wastewater source, along with interpretations of the water quality in the treated-wastewater plume, have been documented in several published reports that are listed in the references.

  16. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  17. The Swiss nuclear installations. Annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs

  18. Creativity and connections: the future of nursing education and practice: the Massachusetts Initiative.

    Science.gov (United States)

    Sroczynski, Maureen; Gravlin, Gayle; Route, Paulette Seymour; Hoffart, Nancy; Creelman, Patricia

    2011-01-01

    Education and practice partnerships are key to effective academic program design and implementation in a time of decreasing supply and increasing demands on the nursing profession. An integrated education/practice competency model can positively impact patient safety, improve patient care, increase retention, and ensure a sufficient and competent nursing workforce, which is paramount to survival of the health care system. Through the contributions of nursing leaders from the broad spectrum of nursing and industry organizations within the state, the Massachusetts Nurse of the Future project developed a competency-based framework for the future design of nursing educational programs to meet current and future practice needs. The Massachusetts Nurse of the Future Nursing Core Competencies(©) expand on the Institute of Medicine's core competencies for all health care professionals and the Quality and Safety Education for Nurses competencies for quality and safety to define the expectations for all professional nurses of the future. The Massachusetts Nurse of the Future Nursing Core Competencies define the knowledge, attitude, and skills required as the minimal expectations for initial nursing practice following completion of a prelicensure professional nursing education program. These competencies are now being integrated into new models for seamless, coordinated nursing curriculum and transition into practice within the state and beyond. Copyright © 2011 Elsevier Inc. All rights reserved.

  19. Barriers to contraceptive access after health care reform: experiences of young adults in Massachusetts.

    Science.gov (United States)

    Bessett, Danielle; Prager, Joanna; Havard, Julia; Murphy, Danielle J; Agénor, Madina; Foster, Angel M

    2015-01-01

    To explore how Massachusetts' 2006 health insurance reforms affected access to sexual and reproductive health (SRH) services for young adults. We conducted 11 focus group discussions across Massachusetts with 89 women and men aged 18 to 26 in 2009. Most young adults' primary interaction with the health system was for contraceptive and other SRH services, although they knew little about these services. Overall, health insurance literacy was low. Parents were primary decision makers in health insurance choices or assisted their adult children in choosing a plan. Ten percent of our sample was uninsured at the time of the discussion; a lack of knowledge about provisions in Chapter 58 rather than calculated risk analysis characterized periods of uninsurance. The dynamics of being transitionally uninsured, moving between health plans, and moving from a location defined by insurance companies as the coverage area limited consistent access to contraception. Notably, staying on parents' insurance through extended dependency, a provision unique to the post-reform context, had implications for confidentiality and access. Young adults' access to and utilization of contraceptive services in the post-reform period were challenged by unanticipated barriers related to information and privacy. The experience in Massachusetts offers instructive lessons for the implementation of national health care reform. Young adult-targeted efforts should address the challenges of health service utilization unique to this population. Copyright © 2015 Jacobs Institute of Women's Health. Published by Elsevier Inc. All rights reserved.

  20. Distribution of polychlorinated biphenyls in the Housatonic River and adjacent aquifer, Massachusetts

    Science.gov (United States)

    Gay, Frederick B.; Frimpter, Michael H.

    1985-01-01

    Polychlorinated biphenyls (PCB's) are sorbed to the fine-grained stream-bottom sediments along the Housatonic River from Pittsfield, Massachusetts, southward to the Massachusetts-Connecticut boundary. The highest PCB concentrations, up to 140,000 micrograms per kilogram, were found in samples of bottom material from a reach of the river between Pittsfield and Woods Pond Dam in Lee, Massachusetts. Sediments in Woods Pond have been estimated to contain about 11,000 pounds of PCB's. Approximately 490 pounds per year of PCB's have also been estimated to move past the Housatonic River gaging station at Great Barrington. The distribution of hydraulic heads, water temperatures, and concentrations of dissolved oxygen, ammonia, nitrate, iron, and manganese in ground water shows that industrial water-supply wells in a sand and gravel aquifer adjacent to a stretch of the river called Woods Pond have been inducing ground-water recharge through the PCB-contaminated bottom sediments of the pond since late 1956. These data indicate that, at one location along the shore of the pond, the upper 40 feet of the aquifer contains water derived from induced infiltration. However, this induced recharge has not moved PCB's from the bottom sediments into a vertical section of the aquifer located 5 feet downgradient from the edge of Woods Pond. Samples taken at selected intervals in this section showed that no PCB's sorbed to the aquifer material or dissolved in the ground water within the detection limits of the chemical analyses.

  1. Estimated hydrologic budgets of kettle-hole ponds in coastal aquifers of southeastern Massachusetts

    Science.gov (United States)

    Walter, Donald A.; Masterson, John P.

    2011-01-01

    Kettle-hole ponds in southeastern Massachusetts are in good hydraulic connection to an extensive coastal aquifer system that includes the Plymouth-Carver aquifer system on the mainland and aquifers underlying Cape Cod. The ponds receive water from, and contribute water to, the underlying glacial aquifer; ponds also receive water from precipitation and lose water to evaporation from the pond surface. Some ponds are connected to surface-water drainage systems and receive water from or contribute water to streams or adjacent wetlands. The Massachusetts Department of Environmental Protection currently (2011) is developing Total Maximum Daily Loads of phosphorus for the freshwater ponds in the region to maintain the health of pond ecosystems; the amounts and sources of water fluxes into and out of the ponds are important factors in determining the amount of phosphorus that can be assimilated into a pond. To assist in this effort, the U.S. Geological Survey used groundwater-flow models of the coastal aquifer system to estimate hydrologic budgets-including inflows and outflows from the aquifer system and adjacent streams and wetlands, and recharge from precipitation-for 425 ponds in southeastern Massachusetts.

  2. STATEWIDE INVENTORIES OF HERITAGE RESOURCES: MACRIS AND THE EXPERIENCE IN MASSACHUSETTS

    Directory of Open Access Journals (Sweden)

    P. H. Stott

    2017-08-01

    Full Text Available The Massachusetts Historical Commission (MHC is the State Historic Preservation Office for Massachusetts. Established in 1963, MHC has been inventorying historic properties for over half a century. Since 1987, it has maintained a heritage database, the Massachusetts Cultural Resource Information System, or MACRIS. Today MACRIS holds over 206,000 records from the 351 towns and cities across the Commonwealth. Since 2004, a selection of the more than 150 MACRIS fields has been available online at mhcmacris. net. MACRIS is widely used by independent consultants preparing project review files, by MHC staff in its regulatory responsibilities, by local historical commissions monitoring threats to their communities, as well as by scholars, historical organizations, genealogists, property owners, reporters, and the general public interested in the history of the built environment. In 2016 MACRIS began migration off of its three-decade old Pick multivalue database to SQL Server, and in 2017, the first redesign of its thirteen-year old web interface should start to improve usability. Longer-term improvements have the goal of standardizing terminology and ultimately bringing interoperability with other heritage databases closer to reality.

  3. Long-term oceanographic observations in Massachusetts Bay, 1989-2006

    Science.gov (United States)

    Butman, Bradford; Alexander, P. Soupy; Bothner, Michael H.; Borden, Jonathan; Casso, Michael A.; Gutierrez, Benjamin T.; Hastings, Mary E.; Lightsom, Frances L.; Martini, Marinna A.; Montgomery, Ellyn T.; Rendigs, Richard R.; Strahle, William S.

    2009-01-01

    This data report presents long-term oceanographic observations made in western Massachusetts Bay at long-term site A (LT-A) (42 deg 22.6' N., 70 deg 47.0' W.; nominal water depth 32 meters) from December 1989 through February 2006 and long-term site B (LT-B) (42 deg 9.8' N., 70 deg 38.4' W.; nominal water depth 22 meters) from October 1997 through February 2004 (fig. 1). The observations were collected as part of a U.S. Geological Survey (USGS) study designed to understand the transport and long-term fate of sediments and associated contaminants in Massachusetts Bay. The observations include time-series measurements of current, temperature, salinity, light transmission, pressure, oxygen, fluorescence, and sediment-trapping rate. About 160 separate mooring or tripod deployments were made on about 90 research cruises to collect these long-term observations. This report presents a description of the 16-year field program and the instrumentation used to make the measurements, an overview of the data set, more than 2,500 pages of statistics and plots that summarize the data, and the digital data in Network Common Data Form (NetCDF) format. This research was conducted by the USGS in cooperation with the Massachusetts Water Resources Authority and the U.S. Coast Guard.

  4. Impact of Particulate Matter Exposure and Surrounding "Greenness" on Chronic Absenteeism in Massachusetts Public Schools.

    Science.gov (United States)

    MacNaughton, Piers; Eitland, Erika; Kloog, Itai; Schwartz, Joel; Allen, Joseph

    2017-02-20

    Chronic absenteeism is associated with poorer academic performance and higher attrition in kindergarten to 12th grade (K-12) schools. In prior research, students who were chronically absent generally had fewer employment opportunities and worse health after graduation. We examined the impact that environmental factors surrounding schools have on chronic absenteeism. We estimated the greenness (Normalized Difference Vegetation Index (NDVI)) and fine particulate matter air pollution (PM 2.5 ) within 250 m and 1000 m respectively of each public school in Massachusetts during the 2012-2013 academic year using satellite-based data. We modeled chronic absenteeism rates in the same year as a function of PM 2.5 and NDVI, controlling for race and household income. Among the 1772 public schools in Massachusetts, a 0.15 increase in NDVI during the academic year was associated with a 2.6% ( p value absenteeism rates, and a 1 μg/m³ increase in PM 2.5 during the academic year was associated with a 1.58% ( p value absenteeism rates. Based on these percentage changes in chronic absenteeism, a 0.15 increase in NDVI and 1 μg/m³ increase in PM 2.5 correspond to 25,837 fewer students and 15,852 more students chronically absent each year in Massachusetts respectively. These environmental impacts on absenteeism reinforce the need to protect green spaces and reduce air pollution around schools.

  5. Statewide Inventories of Heritage Resources: Macris and the Experience in Massachusetts

    Science.gov (United States)

    Stott, P. H.

    2017-08-01

    The Massachusetts Historical Commission (MHC) is the State Historic Preservation Office for Massachusetts. Established in 1963, MHC has been inventorying historic properties for over half a century. Since 1987, it has maintained a heritage database, the Massachusetts Cultural Resource Information System, or MACRIS. Today MACRIS holds over 206,000 records from the 351 towns and cities across the Commonwealth. Since 2004, a selection of the more than 150 MACRIS fields has been available online at mhcmacris. net. MACRIS is widely used by independent consultants preparing project review files, by MHC staff in its regulatory responsibilities, by local historical commissions monitoring threats to their communities, as well as by scholars, historical organizations, genealogists, property owners, reporters, and the general public interested in the history of the built environment. In 2016 MACRIS began migration off of its three-decade old Pick multivalue database to SQL Server, and in 2017, the first redesign of its thirteen-year old web interface should start to improve usability. Longer-term improvements have the goal of standardizing terminology and ultimately bringing interoperability with other heritage databases closer to reality.

  6. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  7. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  8. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... of such protection. (d) Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements...

  9. Update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.; Bruhns, H.

    1999-07-01

    The article describes an updated database of photovoltaic (PV) installations in the UK. The database contains more than 300 records representing over 40,000 photovoltaic installations with more than 100 buildings that use photovoltaic arrays. Figures show: (i) a chart of cumulative PV applications to date; (ii) a chart of cumulative installations in the database; (iii) the growth of Building Integrated PV installed to date; (iv) the cumulative growth of peak power of PV for buildings installed every year since 1985; (v) the distribution by application of all PV installations in the database and (vi) the various applications of PV installations.

  10. Professional installation of overvoltage protection devices. The most common installation errors; Fachgerechte Installation von Ueberspannungsschutzgeraeten. Die haeufigsten Installationsfehler

    Energy Technology Data Exchange (ETDEWEB)

    Gmelch, L. [Dehn und Soehne GmbH und Co. KG, Neumarkt (Germany)

    2007-07-01

    Increasingly sensitive electronic equipment and high demands on plant and system availability necesstate effective protection against lightning and overvoltage. Apart from the measures that must be taken already in the projecting phase in order to minimize the risk of interferences, disturbances and destruction of plants and systems, there are also some basic principles that must be observed when installing overvoltage protection equipment. If these are neglected, the protective function of overvoltage protection systems may be seriously impaired. (orig.)

  11. Installation Capacity Assessment of Damaged Deepwater Pipelines

    Directory of Open Access Journals (Sweden)

    Ramasamy R.

    2014-07-01

    Full Text Available The worldwide exploration and development of subsea and deepwater reservoirs has laid down some new and old engineering challenges to the offshore pipeline industry. This requires large D/t pipelines to be installed at water depths in the vicinity of up to 2700m. The deepwater collapse and buckle propagation event is almost unavoidable as the pipe wall thickness cannot be always determined from the codes and standards due to the limit state criteria. These codes also do not consider any fabrication imperfections and sustained damages emanating from transportation and handling. The objective of this paper is to present the Finite Element Analysis (FEA of dented pipes with D/t ratio more than 45, which is outside the applicability of current design codes, and to investigate the effects on installation capacity of these various damage sizes in terms of collapse and buckle propagation.

  12. Integrated installation for offshore wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Way, J.; Bowerman, H.

    2003-07-01

    A project to investigate the feasibility of integrating the offshore installation of foundation, turbine and tower for offshore wind turbines into one operation is described. Three separate objectives are listed. They are: (1) Telescopic tower study - reversible process incorporating lift and lock mechanisms; (2) Transportation study - technical and economic feasibility of transporting and installing a wind turbine unit via a standard barge with minimal conversion and (3) Self-burial system study - to demonstrate the feasibility of self burial of a slab foundation via controlled jetting beneath the slab. The background to the study and the proposed concepts are discussed. The work carried out to date and the costs are reported together with the findings. Recommendations for future work are listed. The work was carried out by Corus UK Ltd and is managed by Future Energy Solutions for the DTI.

  13. Installation of an innovative remedial technology

    International Nuclear Information System (INIS)

    Hines, B.

    1995-01-01

    The major goal of the Lasagna trademark project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE's sites

  14. Software safety analysis application in installation phase

    International Nuclear Information System (INIS)

    Huang, H. W.; Yih, S.; Wang, L. H.; Liao, B. C.; Lin, J. M.; Kao, T. M.

    2010-01-01

    This work performed a software safety analysis (SSA) in the installation phase of the Lungmen nuclear power plant (LMNPP) in Taiwan, under the cooperation of INER and TPC. The US Nuclear Regulatory Commission (USNRC) requests licensee to perform software safety analysis (SSA) and software verification and validation (SV and V) in each phase of software development life cycle with Branch Technical Position (BTP) 7-14. In this work, 37 safety grade digital instrumentation and control (I and C) systems were analyzed by Failure Mode and Effects Analysis (FMEA), which is suggested by IEEE Standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The FMEA showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (authors)

  15. Software safety analysis practice in installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. W.; Chen, M. H.; Shyu, S. S., E-mail: hwhwang@iner.gov.t [Institute of Nuclear Energy Research, No. 1000 Wenhua Road, Chiaan Village, Longtan Township, 32546 Taoyuan County, Taiwan (China)

    2010-10-15

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  16. Software safety analysis practice in installation phase

    International Nuclear Information System (INIS)

    Huang, H. W.; Chen, M. H.; Shyu, S. S.

    2010-10-01

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  17. Installation and validation of MCNP-4A

    International Nuclear Information System (INIS)

    Marks, N.A.

    1997-01-01

    MCNP-4A is a multi-purpose Monte Carlo program suitable for the modelling of neutron, photon, and electron transport problems. It is a particularly useful technique when studying systems containing irregular shapes. MCNP has been developed over the last 25 years by Los Alamos, and is distributed internationally via RSIC at Oak Ridge. This document describes the installation of MCNP-4A (henceforth referred to as MCNP) on the Silicon Graphics workstation (bluey.ansto.gov.au). A limited number of benchmarks pertaining to fast and thermal systems were performed to check the installation and validate the code. The results are compared to deterministic calculations performed using the AUS neutronics code system developed at ANSTO. (author)

  18. Drones and safety of nuclear installations

    International Nuclear Information System (INIS)

    Tourneur, Jean-Claude

    2015-01-01

    Recent flyovers of French nuclear power plants by drones or UAVs (the owners of these drones could not be identified) has made the safety of these nuclear installations a matter of concern. These events also raised the question of balance between secret and information about these installations. The French Parliamentary Office for the Assessment of Scientific and Technological Choices (OPECST) organised two sets of hearings, a confidential one with people in charge of information related to national defence and security, and a public one opened to all stakeholders. This article briefly reports and discusses the results of these hearings. It appeared that these flyovers are not really a threat, are more a communication action than anything else. Suggestions have been made for the development of researches in the field of drone detection, and also for evolutions of French legislation on drones

  19. Idaho National Engineering Laboratory installation roadmap document

    International Nuclear Information System (INIS)

    1993-01-01

    The roadmapping process was initiated by the US Department of Energy's office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included

  20. Installation for analytic chemistry under irradiation

    International Nuclear Information System (INIS)

    Fradin, J.; Azoeuf, P.; Guillon, A.

    1966-01-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [fr

  1. Meteorological characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.

    1988-01-01

    The atmosphere is the most propitious medium to a rapid transport and diffusion of a pollutant. So, it is important to know its local characteristics which is decisive for every evaluation of radioactive release consequences using transfer models. It is also the siege of intense sudden hazardous phenomena, as tornados and typhoons, that should be taken into account in the installation conception. 1 tab., 6 refs. (F.M.)

  2. Torsion instability of Dynamic Cables during Installation

    OpenAIRE

    Opgård, Marie Finstad

    2017-01-01

    The oil and gas industry today is a heavily regulated segment, and current standard hasestablished restrictions which yields a very limited weather window for offshore cable installations. This is due to experience with cable failure in harsh weather. A limiting factor in current practice is the design criterion for the minimum allowable radius of curvature in the touchdown point. In addition, current practice does not allow for occurrence of compression in the touch down zone...

  3. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  4. MICROCOSM - INSTALLATION OF THE LHC MODEL

    CERN Multimedia

    2002-01-01

    This week, installation of a 6m long section of the LHC starts in Microcosm. This full-scale model is the first part of a new exhibition highlighting the technological challenges and the exciting physics of the LHC era. Many people at CERN have helped with the preparations for the model and the Microcosm team would like to thank all those involved. An inauguration for the press will take place at the start of the next school term.

  5. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  6. Optimal installation program for reprocessing plants

    International Nuclear Information System (INIS)

    Kubokawa, Toshihiko; Kiyose, Ryohei

    1976-01-01

    Optimization of the program of installation of reprocessing plants is mathematically formulated as problem of mixed integer programming, which is numerically solved by the branch-and-bound method. A new concept of quasi-penalty is used to obviate the difficulties associated with dual degeneracy. The finiteness of the useful life of the plant is also taken into consideration. It is shown that an analogous formulation is possible for the cases in which the demand forecasts and expected plant lives cannot be predicted with certainty. The scale of the problem is found to have kN binary variables, (k+2)N continuous variables, and (k+3)N constraint conditions, where k is the number of intervals used in the piece-wise linear approximation of a nonlinear objective function, and N the overall duration of the period covered by the installation program. Calculations are made for N=24 yr and k=3, with the assumption that the plant life is 15 yr, the plant scale factor 0.5, and the maximum plant capacity 900 (t/yr). The results are calculated and discussed for four different demand forecasts. The difference of net profit between optimal and non-optimal installation programs is found to be in the range of 50 -- 100 M$. The pay-off matrix is calculated, and the optimal choice of action when the demand cannot be forecast with certainty is determined by applying Bayes' theory. The optimal installation program under such conditions of uncertainty is obtained also with a stochastic mixed integer programming model. (auth.)

  7. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  8. Installing Git under MacOS

    OpenAIRE

    Fitzpatrick, Benjamin

    2015-01-01

    Step by step guide to installing the version control software Git under the Macintosh Operating System MacOS X (and later). Includes a seqeunce of screenshots with hand drawn arrows ;-) These slides are part of the materials for an Introductory course on the R language and environment for statistial computing. Free and Open Source materials for this course hosted on GitHub: https://github.com/brfitzpatrick/Intro_to_R

  9. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2001-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2001 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2001. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  10. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  11. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  12. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  13. Numerical simulation of installation of skirt foundations

    Energy Technology Data Exchange (ETDEWEB)

    Vangelsten, Bjoern Vidar

    1997-12-31

    Skirt foundation has been increasingly used for permanent offshore oil installations and anchors for drilling ships. Suction is commonly used in skirt foundation installing. If a large amount of suction is applied, the soil around the foundation may fail and the foundation become useless. This thesis studies failure due to high seepage gradients, aiming to provide a basis for reducing the risk of such failures. Skirt penetration model testing has shown that to solve the problem one must understand what is going on at the skirt tip during suction installation. A numerical model based on micro mechanics was developed as continuum hypothesis was seen to be unsuitable to describe the processes in the critical phases of the failure. The numerical model combines two-dimensional elliptical particles with the finite difference method for flow to model water flow in a granular material. The key idea is to formulate the permeability as a function of the porosity of the grain assembly and so obtain an interaction between the finite difference method on flow and the particle movement. A computer program, DYNELL, was developed and used to simulate: (1) weight penetration of a skirt wall, (2) combined suction and weight penetration of a skirt wall, and (3) critical gradient tests around a skirt wall to study failure mechanisms. The model calculations agree well with laboratory experiments. 16 refs., 124 figs., 21 tabs.

  14. Design of the Los Alamos generator installation

    International Nuclear Information System (INIS)

    Boenig, H.J.; Schillig, J.B.; Rogers, J.D.; Huddleston, S.W.; Konkel, H.E.; Rosev, B.J.

    1989-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant is being installed at Los Alamos to be used as the pulsed power generator for the Confinement Physics Research Facility. The generator is mounted on a spring foundation to avoid dynamic forces from being transmitted to the substructure and the ground. A 6 MW load-commutated inverter drive will accelerate the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method is being changed from hydrogen to air cooling. A current limiting fuse, with a fuse clearing current of 80 kA, will protect the generator output against short circuit currents. Changes in the excitation system are described. A status report of the installation and an approximate schedule for completing the installation are presented. The paper also addresses results of special studies and tests undertaken to evaluate the condition of the generator and to predict the behavior of some critical mechanical generator components under pulsed loading conditions. 1 ref., 4 figs., 2 tabs

  15. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  16. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  17. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  18. An application of residual current protective device at electrical installation

    International Nuclear Information System (INIS)

    Firman Silitonga

    2008-01-01

    In an electrical installation, a protection for overload and short circuit are always to be installed. In addition to the installation, it is necessary to be installed a protection device for residual current because both the short circuit and the overload device protection will not work for the residual current. The quantity of the residual current must be defined first at any electrical installation to define an appropriate residual current protection so that not every residual current will break the circuit down. This paper will explain a method how to install a residual protection device for 3500 VA or more at TN and TT of earthing system. (author)

  19. Comparison of diffusion- and pumped-sampling methods to monitor volatile organic compounds in ground water, Massachusetts Military Reservation, Cape Cod, Massachusetts, July 1999-December 2002

    Science.gov (United States)

    Archfield, Stacey A.; LeBlanc, Denis R.

    2005-01-01

    To evaluate diffusion sampling as an alternative method to monitor volatile organic compound (VOC) concentrations in ground water, concentrations in samples collected by traditional pumped-sampling methods were compared to concentrations in samples collected by diffusion-sampling methods for 89 monitoring wells at or near the Massachusetts Military Reservation, Cape Cod. Samples were analyzed for 36 VOCs. There was no substantial difference between the utility of diffusion and pumped samples to detect the presence or absence of a VOC. In wells where VOCs were detected, diffusion-sample concentrations of tetrachloroethene (PCE) and trichloroethene (TCE) were significantly lower than pumped-sample concentrations. Because PCE and TCE concentrations detected in the wells dominated the calculation of many of the total VOC concentrations, when VOC concentrations were summed and compared by sampling method, visual inspection also showed a downward concentration bias in the diffusion-sample concentration. The degree to which pumped- and diffusion-sample concentrations agreed was not a result of variability inherent within the sampling methods or the diffusion process itself. A comparison of the degree of agreement in the results from the two methods to 13 quantifiable characteristics external to the sampling methods offered only well-screen length as being related to the degree of agreement between the methods; however, there is also evidence to indicate that the flushing rate of water through the well screen affected the agreement between the sampling methods. Despite poor agreement between the concentrations obtained by the two methods at some wells, the degree to which the concentrations agree at a given well is repeatable. A one-time, well-bywell comparison between diffusion- and pumped-sampling methods could determine which wells are good candidates for the use of diffusion samplers. For wells with good method agreement, the diffusion-sampling method is a time

  20. Contaminant transport and accumulation in Massachusetts Bay and Boston Harbor; a summary of U.S. Geological Survey studies

    Science.gov (United States)

    Butman, Bradford; Bothner, Michael H.; Hathaway, J.C.; Jenter, H.L.; Knebel, H.J.; Manheim, F.T.; Signell, R.P.

    1992-01-01

    The U.S. Geological Survey (USGS) is conducting studies in Boston Harbor, Massachusetts Bay, and Cape Cod Bay designed to define the geologic framework of the region and to understand the transport and accumulation of contaminated sediments. The region is being studied because of environmental problems caused by the introduction of wastes for a long time, because a new ocean outfall (to begin operation in 1995) will change the location for disposal of treated Boston sewage from Boston Harbor into Massachusetts Bay, and because of the need to understand the transport of sediments and associated contaminants in order to address a wide range of management questions. The USGS effort complements and is closely coordinated with the research and monitoring studies supported by the Massachusetts Environmental Trust, the Massachusetts Bays Program, and by the Massachusetts Water Resources Authority. The USGS study includes (1) geologic mapping, (2) circulation studies, (3) long-term current and sediment transport observations, (4) measurements of contaminant inventories and rates of sediment mixing and accumulation, (5) circulation modeling, (6) development of a contaminated sediments data base, and (7) information exchange. A long-term objective of the program is to develop a predictive capability for sediment transport and accumulation.

  1. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    Science.gov (United States)

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  2. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  3. Accuracy of assisted reproductive technology information on birth certificates: Florida and Massachusetts, 2004-06.

    Science.gov (United States)

    Cohen, Bruce; Bernson, Dana; Sappenfield, William; Kirby, Russell S; Kissin, Dmitry; Zhang, Yujia; Copeland, Glenn; Zhang, Zi; Macaluso, Maurizio

    2014-05-01

    Assisted Reproductive Technology (ART) includes fertility procedures where both egg and sperm are handled in the lab. ART use has increased considerably in recent years, accounting for 47,090 livebirths in the U.S. in 2010. ART increases the probability of multiple gestation births, which are at higher risks than singletons for adverse outcomes. Additionally, ART is associated with a greater risk of complications during pregnancy, labour, and delivery, and increased risk of adverse perinatal outcomes in singleton births. We merged Florida and Massachusetts birth records from 2004-06 with the National ART Surveillance System (NASS) and using NASS as the gold standard, calculated sensitivity, specificity, and positive predictive value (PPV) of ART reporting on the birth certificates by maternal, infant, and hospital characteristics. We fit random-effects logistic regression models to evaluate simultaneously the association of ART reporting with these predictors while accounting for correlation among births occurring in the same hospital. Sensitivity of ART reporting on the birth certificate was 28.9% in Florida and 41.4% in Massachusetts. Specificity was >99% in both states. PPV was 45.5% in Florida and 54.6% in Massachusetts. The odds of ART reporting varied by state and by several maternal and delivery characteristics including age, parity, history of fetal loss, plurality, race/Hispanic ethnicity, delivery payment source, pre-existing conditions, and complications during pregnancy or labour and delivery. There was significant under-reporting of ART procedures on the birth certificates. Using data on ART births identified only from birth certificates yields a biased sample of the population of ART births. © 2014 John Wiley & Sons Ltd.

  4. Linking student performance in Massachusetts elementary schools with the "greenness" of school surroundings using remote sensing.

    Science.gov (United States)

    Wu, Chih-Da; McNeely, Eileen; Cedeño-Laurent, J G; Pan, Wen-Chi; Adamkiewicz, Gary; Dominici, Francesca; Lung, Shih-Chun Candice; Su, Huey-Jen; Spengler, John D

    2014-01-01

    Various studies have reported the physical and mental health benefits from exposure to "green" neighborhoods, such as proximity to neighborhoods with trees and vegetation. However, no studies have explicitly assessed the association between exposure to "green" surroundings and cognitive function in terms of student academic performance. This study investigated the association between the "greenness" of the area surrounding a Massachusetts public elementary school and the academic achievement of the school's student body based on standardized tests with an ecological setting. Researchers used the composite school-based performance scores generated by the Massachusetts Comprehensive Assessment System (MCAS) to measure the percentage of 3rd-grade students (the first year of standardized testing for 8-9 years-old children in public school), who scored "Above Proficient" (AP) in English and Mathematics tests (Note: Individual student scores are not publically available). The MCAS results are comparable year to year thanks to an equating process. Researchers included test results from 2006 through 2012 in 905 public schools and adjusted for differences between schools in the final analysis according to race, gender, English as a second language (proxy for ethnicity and language facility), parent income, student-teacher ratio, and school attendance. Surrounding greenness of each school was measured using satellite images converted into the Normalized Difference Vegetation Index (NDVI) in March, July and October of each year according to a 250-meter, 500-meter, 1,000-meter, and 2000-meter circular buffer around each school. Spatial Generalized Linear Mixed Models (GLMMs) estimated the impacts of surrounding greenness on school-based performance. Overall the study results supported a relationship between the "greenness" of the school area and the school-wide academic performance. Interestingly, the results showed a consistently positive significant association between the

  5. Use of fees to fund local public health services in Western Massachusetts.

    Science.gov (United States)

    Shila Waritu, A; Bulzacchelli, Maria T; Begay, Michael E

    2015-01-01

    Recent budget cuts have forced many local health departments (LHDs) to cut staff and services. Setting fees that cover the cost of service provision is one option for continuing to fund certain activities. To describe the use of fees by LHDs in Western Massachusetts and determine whether fees charged cover the cost of providing selected services. A cross-sectional descriptive analysis was used to identify the types of services for which fees are charged and the fee amounts charged. A comparative cost analysis was conducted to compare fees charged with estimated costs of service provision. Fifty-nine LHDs in Western Massachusetts. Number of towns charging fees for selected types of services; minimum, maximum, and mean fee amounts; estimated cost of service provision; number of towns experiencing a surplus or deficit for each service; and average size of deficits experienced. Enormous variation exists both in the types of services for which fees are charged and fee amounts charged. Fees set by most health departments did not cover the cost of service provision. Some fees were set as much as $600 below estimated costs. These results suggest that considerations other than costs of service provision factor into the setting of fees by LHDs in Western Massachusetts. Given their limited and often uncertain funding, LHDs could benefit from examining their fee schedules to ensure that the fee amounts charged cover the costs of providing the services. Cost estimates should include at least the health agent's wage and time spent performing inspections and completing paperwork, travel expenses, and cost of necessary materials.

  6. Point-of-Care Child Psychiatry Expertise: The Massachusetts Child Psychiatry Access Project.

    Science.gov (United States)

    Van Cleave, Jeanne; Le, Thuy-Tien; Perrin, James M

    2015-05-01

    Since 2005, after a pilot program, the Massachusetts Child Psychiatry Access Project (MCPAP) has provided point-of-care psychiatry expertise and referral assistance by telephone to primary care providers. We examined its adoption and use and the practice characteristics associated with different adoption timelines and use patterns. We merged data on calls to MCPAP in 2005 to 2011 with practice data (enrollment year, panel size, regional team assignment). We categorized practices' days from enrollment to first call (adoption) (0-100, 101-365, > 365 days) and quartile of call frequency (use) (annual highest, middle, and lowest quartiles of number of calls per 1000 empanelled patients). We determined associations between adoption and use and practice characteristics using multivariate models. Among 285 practices, adoption and use varied: 55% called 0 to 100 days from enrollment and 16% called >365 days from enrollment. Practices in the highest quartile of use made a mean 15.5 calls/year per 1000 patients, whereas the lowest quartile made 0.4 calls/year per 1000 patients. Adoption within 100 days was associated with enrollment during or after 2007 (odds ratio [OR] 4.09, 95% confidence interval [CI] 2.23-7.49) and assignment to the team at the pilot site (OR 4.42, 95% CI 2.16-9.04 for central Massachusetts). Highest-quartile use was associated with team assignment (OR 3.58, 95% CI 1.86-6.87 for central Massachusetts) and panel size (OR 0.10, 95% CI 0.03-0.31 for ≥ 10,000 vs < 2000 patients). Adoption and use of MCPAP varied widely. Timing of enrollment, assignment to the team from the program's pilot site, and panel size were associated with patterns of adoption and use. Findings may help other programs design effective implementation strategies. Copyright © 2015 by the American Academy of Pediatrics.

  7. Development and installation of the GERDA experiment

    International Nuclear Information System (INIS)

    Smolnikov, A

    2010-01-01

    The progress in the development of the GERDA (GErmanium Detector Array) experiment is presented. The goal of the experiment is the search for neutrinoless double beta decay of 76 Ge with considerable reduction of background in comparison with predecessor experiments. GERDA will operate bare germanium semiconductor detectors (enriched in 76 Ge) submerged in high purity liquid argon supplemented by a water shield. The experimental set up is currently under construction in the underground facility of LNGS, Italy. The results of various R and D efforts and the main steps of the GERDA set up design and installation are given as well as several novel methods for background reduction are described.

  8. Basic electrical installation work level 2

    CERN Document Server

    Linsley, Trevor

    2015-01-01

    Everything needed to pass the first part of the City & Guilds 2365 Diploma in Electrical InstallationsUpdated in line with the 3rd Amendment of the 17th Edition IET Wiring Regulations, this new edition covers the City & Guilds 2365-02 course. Written in an accessible style with a chapter dedicated to each unit of the syllabus, this book helps you to master each topic before moving on to the next. End of chapter revision questions enable learners to check their understanding and consolidate key concepts learnt in each chapter. With a companion website containing videos, animations, worksheets a

  9. RF installation for the grain disinfestation

    CERN Document Server

    Zajtzev, B V; Kobetz, A F; Rudiak, B I

    2001-01-01

    The ecologically pure method of grain product disinfestations through the grain treatment with the RF electric field is described. The experimental data obtained showed that with strengths of the electrical RF field of E=5 kV/cm and frequency of 80 MHz the relative death rate is 100%.The time of the grain treatment it this case is 1 sec. The pulses with a duration of 600 mu s and repetition rate of 2 Hz were used, the duration of the front was 10 mu s. The schematic layout of installation with a productivity of 50 tones/h and power of 10 kW is given.

  10. Safety culture in nuclear installations. Proceedings

    International Nuclear Information System (INIS)

    Carnino, A.; Weimann, G.

    1995-04-01

    These proceedings of the International Topical Meeting on Safety Culture in Nuclear Installations held in Vienna, Austria from 24 to 28 April 1995 provide a wide forum of information exchange and discussions on the topic safety culture in nuclear power plants. Safety culture deals with human factors since it deals with attitudes, organization and management. It then means that it has a natural component in it which is linked to the national culture and education. There are about 95 contributions, some of them presented by title and abstract only. All of them are in the subject scope of INIS. (Botek)

  11. Estimating Wear Of Installed Ball Bearings

    Science.gov (United States)

    Keba, John E.; Mcvey, Scott E.

    1993-01-01

    Simple inspection and measurement technique makes possible to estimate wear of balls in ball bearing, without removing bearing from shaft on which installed. To perform measurement, one observes bearing cage while turning shaft by hand to obtain integral number of cage rotations and to measure, to nearest 2 degrees, number of shaft rotations producing cage rotations. Ratio between numbers of cages and shaft rotations depends only on internal geometry of bearing and applied load. Changes in turns ratio reflect changes in internal geometry of bearing provided measurements made with similar bearing loads. By assuming all wear occurs on balls, one computes effective value for this wear from change in turns ratio.

  12. Process computers automate CERN power supply installations

    International Nuclear Information System (INIS)

    Ullrich, H.; Martin, A.

    1974-01-01

    Higher standards of performance and reliability in the power plants of large particle accelerators necessitate increasing use of automation. The CERN (European Nuclear Research Centre) in Geneva started to employ process computers for plant automation at an early stage in its history. The great complexity and extent of the plants for high-energy physics first led to the setting-up of decentralized automatic systems which are now being increasingly combined into one interconnected automation system. One of these automatic systems controls and monitors the extensive power supply installations for the main ring magnets in the experimental zones. (orig.) [de

  13. Licensing systems and inspection of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    The first study analysing the regulations governing the licensing and inspection of nuclear installations in OECD countries was published by OECD/NEA in 1980, and revised in 1986. Since then there have been amendments to national regulations on the subject, which have warranted updating of this publication. This new study provides a description of the licensing regulations and practices applied in the twenty OECD countries with provisions in that field. The national systems have been described according to a standard format to make comparisons and research easier. In most cases, the descriptions are supplemented by flow charts illustrating the procedures and specifying the different authorities involved in the licensing procedures [fr

  14. Small wind planning and building successful installations

    CERN Document Server

    Clark, Nolan

    2013-01-01

    This book provides a cohesive guide to achieving successful small wind installations. It is a comprehensive information resource from one of the world's most experienced small wind professionals, covering all the key issues for small wind system development, from site and machine selection to international standards compliance. Engineers who are tasked with planning and developing these small wind systems, from choosing the best site and accurately estimating likely power output to obtaining proper permitting and troubleshooting operational inefficiencies, will find this book an ess

  15. Jim Walter Resources installs new overland conveyor

    Energy Technology Data Exchange (ETDEWEB)

    Fiscor, S.

    2008-12-15

    Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

  16. Extractive metalurgical pilot plant. Project and installation

    International Nuclear Information System (INIS)

    Paula, H.C.B.; Rolim, T.L.; Santana, A.O. de; Santos, F.S.M. dos; Dantas, C.C.

    1986-01-01

    An extractive metalurgical pilot plant with a flow capacity of 200l/h of phosphoric leach, recovering 80% of the uranium content has been designed and installed. Starting from the diagrams of the chemical process in the laboratory scale, the equipment worksheet of the basic project were developed. The procedure for dimensioning and positioning of each component is described. An isometric figure and the pilot plant lay-out are included. The pilot plant occupying 41 m 2 has been tested and operates at its nominal capacity. (author) [pt

  17. Safety culture in nuclear installations. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Carnino, A [ed.; International Atomic Energy Agency, Vienna (Austria); Weimann, G [ed.; Oesterreichisches Forschungszentrum Seibersdorf GmbH (Austria)

    1995-04-01

    These proceedings of the International Topical Meeting on Safety Culture in Nuclear Installations held in Vienna, Austria from 24 to 28 April 1995 provide a wide forum of information exchange and discussions on the topic safety culture in nuclear power plants. Safety culture deals with human factors since it deals with attitudes, organization and management. It then means that it has a natural component in it which is linked to the national culture and education. There are about 95 contributions, some of them presented by title and abstract only. All of them are in the subject scope of INIS. (Botek).

  18. CAST with its micromegas detector installed.

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    The CERN Axion Solar Telescope (CAST) uses a prototype LHC dipole magnet to search for very weakly interacting neutral particles called axions, which should originate in the core of the Sun. The magnet converts the solar axions to photons which are then detected by an X-ray detector based on Micromegas technology. CAST's Micromegas detector has now been installed. Photos 01 02: General view of the CAST experiment with the Micromegas detector in place. Photo 03: Close-up of the micromegas set-up.

  19. Border installations: the experience of Wackersdorf

    International Nuclear Information System (INIS)

    Heller, K.

    1988-01-01

    Following the decision of the Government of the Federal Republic of Germany to construct a fuel reprocessing plant (in the wider context of organising radioactive waste disposal) at Wackersdorf, 130 km from the Austrian border, actions were brought against the German constructor before Austrian and German courts. The author describes the mechanisms governing administrative procedures in both countries and their connection with public international law. He analyses the legal argumentations developed before the different courts as well as the debate on the concept of territoriality and border installations (NEA) [fr

  20. Solution for remote handling in accelerator installations

    International Nuclear Information System (INIS)

    Burgerjon, J.J.; Ekberg, E.L.; Grisham, D.L.; Horne, R.A.; Meyer, R.E.; Flatau, C.R.; Wilson, K.B.

    1977-01-01

    A description is given of a remote-handling system designed for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF), versatile enough to be used in a variety of situations found around particle accelerators. The system consists of a bilateral (force-reflecting) servomanipulator installed on an articulated hydraulic boom. The boom also carries the necessary tools and observation devices. The whole slave unit can be moved by crane or truck to the area of operation. A control cable connects the slave unit with the control station, located at a safe distance in a trailer. Various stages of development as well as some operating experience are discussed

  1. Performance Results for Massachusetts and Rhode Island Deep Energy Retrofit Pilot Community

    Energy Technology Data Exchange (ETDEWEB)

    Gates, C. [Building Science Corporation, Somerville, MA (United States); Neuhauser, K. [Building Science Corporation, Somerville, MA (United States)

    2014-03-01

    Between December, 2009 and December, 2012, 42 deep energy retrofit (DER) projects were completed through a pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. Thirty-seven of these projects were comprehensive retrofits while five were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. Building Science Corporation developed a consistent "package" of measures in terms of the performance targeted for major building components. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average.

  2. The trials of Hanna Porn: the campaign to abolish midwifery in Massachusetts.

    Science.gov (United States)

    Declercq, E R

    1994-06-01

    The case of Hanna Porn affords an opportunity to examine how the laws that led to the abolition of midwifery in Massachusetts evolved and were applied to the midwife whose case set the state legal precedent. Mrs Porn served primarily a Finnish-Swedish clientele of wives of laborers. The outcomes of the births she attended appear to have been positive, and she maintained a neonatal mortality rate of less than half that of local physicians. She also repeatedly defied court orders to stop practicing. Her case exemplifies the efforts that occurred nationally to abolish midwifery in the United States.

  3. Radiological survey results at 5 Porter Street, Beverly, Massachusetts (VB019)

    International Nuclear Information System (INIS)

    Foley, R.D.; Johnson, C.A.

    1992-07-01

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at 5 Porter Street, Beverly, Massachusetts. The survey was performed in May 1991. The purpose of the survey was to determine if uranium from work performed under government contract at the former Ventron facility had migrated off-site to neighboring areas. The survey included a surface gamma scan and the collection of soil samples for radionuclide analyses. Results of the survey demonstrated no radionuclide concentrations or radiation measurements in excess of the DOE Formerly Utilized Site Remedial Action Program guidelines

  4. Radiological survey results at Porter Street City Park, Beverly, Massachusetts (VB026)

    International Nuclear Information System (INIS)

    Foley, R.D.; Johnson, C.A.

    1992-08-01

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at the Porter Street City Park, Beverly, Massachusetts. The survey was performed in May 1991. The purpose of the survey was to determine if uranium from work performed under government contract at the former Ventron facility had migrated off-site to neighboring areas. The survey included a surface gamma scan and the collection of soil samples for radionuclide analyses. Results of the survey demonstrated no radionuclide concentrations or radiation measurements in excess of the DOE Formerly Utilized Sites Remedial Action Program guidelines

  5. Radiological survey results at 2 Porter Street, Beverly, Massachusetts (VB005)

    International Nuclear Information System (INIS)

    Foley, R.D.; Carrier, R.F.

    1992-08-01

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at 2 Porter Street, Beverly, Massachusetts. The survey was performed in May 1991. The purpose of the survey was to determine if uranium dust from work performed under government contract at the former Ventron facility had migrated off-site to neighboring areas. The survey included a surface gamma scan and the collection of soil samples fore radionuclide analyses. Results of the survey demonstrated no radionuclide concentrations or radiation measurements in excess of the DOE Formerly Utilized Sites Remedial Action Program guidelines

  6. Radiological survey results at 9 Porter Street, Beverly, Massachusetts (VB020)

    International Nuclear Information System (INIS)

    Foley, R.D.; Johnson, C.A.

    1992-07-01

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at 9 Porter Street, Beverly, Massachusetts. The survey was performed in May 1991. The purpose of the survey was to determine if uranium from work performed under government contract at the former Ventron facility had migrated off-site to neighboring areas. The survey included a surface gamma scan and the collection of soil samples for radionuclide analyses. Results of the survey demonstrated no radionuclide concentrations or radiation measurements in excess of the DOE Formerly Utilized Sites Remedial Action Program guidelines

  7. Education Reform: Ten Years after the Massachusetts Education Reform Act of 1993

    Directory of Open Access Journals (Sweden)

    Linda Driscoll, Joseph B. Berger, Ronald K. Hambleton, Lisa A. Keller, Robert W. Maloy, David Hart, Paul Oh, Victoria Getis, Susan Bowles, Francis L. Gougeon, Kathryn A. McDermott, Andrew Churchill

    2005-02-01

    Full Text Available In June 1993, Governor William Weld signed into law the Massachusetts Education Reform Act (MERA. MERA greatly increased the state role both in funding public education and in guiding the local educational process. The state’s role changed to incorporate setting curriculum frameworks and holding schools accountable for student performance. Because MERA was designed to be a systemic reform of education, all of the various state activities and policies needed to fit together into a coherent whole based on state educational standards.

  8. Data from studies of previous radioactive waste disposal in Massachusetts Bay

    International Nuclear Information System (INIS)

    Curtis, W.R.; Mardis, H.M.

    1984-12-01

    This report presents the results of studies conducted in Massachusetts Bay during 1981 and 1982. Included are data from: (1) a side scan sonar survey of disposal areas in the Bay that was carried out by the National Oceanic and Atmospheric Administration (NOAA) for EPA; (2) Collections of sediment and biota by NOAA for radiochemical analysis by EPA; (3) collections of marketplace seafood samples by the Food and Drug Administration (FDA) for radioanalysis by both FDA and EPA; and (4) a radiological monitoring survey of LLW disposal areas by EPA to determine whether there should be any concern for public health resulting from previous LLW disposals in the Bay

  9. National Uranium Resource Evaluation: Albany Quadrangle, Massachusetts, New York, Connecticut, Vermont, and New Hampshire

    Energy Technology Data Exchange (ETDEWEB)

    Field, M T; Truesdell, D B

    1982-09-01

    The Albany 1/sup 0/ x 2/sup 0/ Quadrangle, Massachusetts, New York, Connecticut, Vermont, and New Hampshire, was evaluated to a depth of 1500 m for uranium favorability using National Uranium Resource Evaluation criteria. Areas of favorable geology and aeroradioactivity anomalies were examined and sampled. Most Triassic and Jurassic sediments in the Connecticut Basin, in the central part of the quadrangle, were found to be favorable for sandstone uranium deposits. Some Precambrian units in the southern Green Mountains of Vermont were found favorable for uranium deposits in veins in metamorphic rocks.

  10. Obtaining Streamflow Statistics for Massachusetts Streams on the World Wide Web

    Science.gov (United States)

    Ries, Kernell G.; Steeves, Peter A.; Freeman, Aleda; Singh, Raj

    2000-01-01

    A World Wide Web application has been developed to make it easy to obtain streamflow statistics for user-selected locations on Massachusetts streams. The Web application, named STREAMSTATS (available at http://water.usgs.gov/osw/streamstats/massachusetts.html ), can provide peak-flow frequency, low-flow frequency, and flow-duration statistics for most streams in Massachusetts. These statistics describe the magnitude (how much), frequency (how often), and duration (how long) of flow in a stream. The U.S. Geological Survey (USGS) has published streamflow statistics, such as the 100-year peak flow, the 7-day, 10-year low flow, and flow-duration statistics, for its data-collection stations in numerous reports. Federal, State, and local agencies need these statistics to plan and manage use of water resources and to regulate activities in and around streams. Engineering and environmental consulting firms, utilities, industry, and others use the statistics to design and operate water-supply systems, hydropower facilities, industrial facilities, wastewater treatment facilities, and roads, bridges, and other structures. Until now, streamflow statistics for data-collection stations have often been difficult to obtain because they are scattered among many reports, some of which are not readily available to the public. In addition, streamflow statistics are often needed for locations where no data are available. STREAMSTATS helps solve these problems. STREAMSTATS was developed jointly by the USGS and MassGIS, the State Geographic Information Systems (GIS) agency, in cooperation with the Massachusetts Departments of Environmental Management and Environmental Protection. The application consists of three major components: (1) a user interface that displays maps and allows users to select stream locations for which they want streamflow statistics (fig. 1), (2) a data base of previously published streamflow statistics and descriptive information for 725 USGS data

  11. National Uranium Resource Evaluation: Albany Quadrangle, Massachusetts, New York, Connecticut, Vermont, and New Hampshire

    International Nuclear Information System (INIS)

    Field, M.T.; Truesdell, D.B.

    1982-09-01

    The Albany 1 0 x 2 0 Quadrangle, Massachusetts, New York, Connecticut, Vermont, and New Hampshire, was evaluated to a depth of 1500 m for uranium favorability using National Uranium Resource Evaluation criteria. Areas of favorable geology and aeroradioactivity anomalies were examined and sampled. Most Triassic and Jurassic sediments in the Connecticut Basin, in the central part of the quadrangle, were found to be favorable for sandstone uranium deposits. Some Precambrian units in the southern Green Mountains of Vermont were found favorable for uranium deposits in veins in metamorphic rocks

  12. Proper Installation of New Windows | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  13. 30 CFR 57.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or... wiring. ...

  14. 46 CFR 176.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...

  15. Design and installation package for a solar powered pump

    Science.gov (United States)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  16. Rules and regulations on ionizing radiations sources installations

    International Nuclear Information System (INIS)

    1980-01-01

    The finality of this legislative text is to establish the standards and procedures for site, design, building, operation and decommissioning of nuclear installations, radioactive installations and ionizing radiations sources. This text include the commercialization of radioactive substances and equipment fabrication

  17. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  18. LHC: installation du plus grand trajectographe au silicium du monde

    CERN Multimedia

    2008-01-01

    The installation of the largest silicon trajectograph of the world was concluded at CERN. Thursday December 13 at dawn, the silicon trajectograph with ribbons of CMS (*) began its trip from the principal site of CERN to its installation of experimentation.

  19. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  20. Classified installations for environmental protection subject to declaration. Tome 2

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Legislation concerning classified installations govern most of industries or dangerous or pollutant activities. This legislation aims to prevent risks and harmful effects coming from an installation, air pollution, water pollution, noise, wastes produced by installations, even aesthetic bad effects. Pollutant or dangerous activities are defined in a list called nomenclature which obliged installations to a rule of declaration or authorization. Technical regulations ordered by the secretary of state for the environment are listed in tome 2